Cities Index.
Attach 5 - July 22, 2025 City Council meeting staff report -- ODS

Laguna Beach City Council
November 18, 2025

Document
Attach 5 - July 22, 2025 City Council meeting staff report -- ODS
Meeting
November 18, 2025
Body
Laguna Beach City Council
Pages
16
Original file
25.4 MB
Text extracted from the city's file for reading and search. Open the original on lagunabeachcity.primegov.com. That file is the official record.

AGENDA REPORT
Meeting Date
July 22, 2025
Business
20 SUBJECT: AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH DE NOVO

PLANNING GROUP FOR REVISED SCOPE OF WORK FOR COMPREHENSIVE

ZONING CODE UPDATE, INCLUDING DEVELOPMENT OF OBJECTIVE
DESIGN STANDARDS; AND FINDING ACTION IS NOT A PROJECT UNDER CEQA GUIDELINES SECTION 15378
RECOMMENDATION: It is recommended that the City Council:

1. Authorize the City Manager to execute a contract amendment, all in a form acceptable to the City Attorney, with De Novo Planning Group for the modified and additional tasks associated with the preparation of a Comprehensive Zoning Code Update, for a $388,300 increase, at a total cost not to exceed $709,749; and

2. Find that this action is not a project subject to the California Environmental Quality Act under State CEQA Guidelines Section 15378.

Appropriation: Fund Name:
---------....,....--- --------------
Submitted By: ~ /)/)~.• ----_L---
M.icimeider, Director of
Community Development

SUMMARY OF THE MATTER
Approved: ___ lr:? ____ c...._ ._~---
Dave Kiff, City Manager
On October 8, 2024, the City Council awarded a contract in the amount of $321,449 to De Novo Planning Group for the preparation of the Comprehensive Zoning Code Update ("CZCU"), a key project identified during the 2022 Strategic Planning and Goal Setting Workshop and as a policy initiative during its 2024 Annual Planning Workshop held on January 19, 2024.

Staff is returning to the City Council with a contract amendment to revise and expand the scope of services associated with the CZCU. The services provided with the restructured contract are detailed in the attached Contract Modification #1 for the CZCU - Expanded Scope of Work (Attachment 1). The consultant anticipates the entire effort (the original scope of work and the additional tasks) will take approximately 26 months (August 2025 to September 2027). The revised schedule prioritizes the adoption of the objective design standards for single-family and two-family residential projects and the updated parking standards.

The City has prepared a proposed amendment to the professional services agreement with De Novo Planning Group for the additional services, which requires $388,300 to complete (Attachment 1).

DISCUSSION
Expanded Scope of Work
The restructured contract includes six additional tasks, with two optional sub tasks, that require additional funding in the amount of $388,300 to cover consultant costs. l. Parking Standards. This task involves developing parking recommendations for commercial areas outside of the Downtown Specific Plan area. The various subtasks include review of existing planning documents to understand the City's current parking regulations and assessing parking Attachment 5
156
Contract Amendment for Comprehensive Zoning Code Update & Development of Objective Design Standards
July 22, 2025

Page 2 of 5 ends

standards utilized in comparable cities, estimation of current parking supply and demand through data collection, and the calculation of a blended parking requirement for non-residential uses.

Two optional subtasks are proposed to supplement the parking-related work:

Task 1.5 - Other Parking Code Recommendations: This subtask involves evaluating and proposing updates to various components of the City's parking regulations, including fractional parking requirements, intensification of use calculations, developing on-site bicycle parking standards, parking area calculation methods, accommodation of ride-hailing services, Transportation Demand Management (TDM) regulations, and zoning constraints related to parking. It should be noted that this optional task implements various strategies and programs contained in the City Council-adopted Parking and Transportation Demand Management Report.
1 Task 1.6 - In-Lieu Parking Certificate Program Recommendations: This subtask will develop recommendations for refining the City's In-Lieu Parking Certificate Program, including adjustments to certificate pricing, strategies to increase participation, and potential expansion of eligible geographic areas as part of the CZCU.

2. Update Commercial Zoning Districts. De Novo Planning Group will review existing provisions in Title 25 related to Commercial Zoning Districts to identify elements to retain, eliminate, or revise.

Based on input from City staff, City Council, Planning Commission, Design Review Board, and public participation efforts, the consultant will prepare comprehensive updates to the Commercial Zoning Districts as part of the broader CZCU effort, which aims to streamline and simplify the zoning code.

3. Update M-JA Zone. This task focuses on the evaluation and update of Laguna Beach Municipal Code Chapter 25.32, M-lA Light Industrial Zone, with an emphasis on expanding permitted uses to include residential, mixed-use, and limited commercial uses. A community workshop will be held specifically for the Laguna Canyon area to gather input on desired future development in the M-lA Zone.

4. General Plan Updates. As part of the CZCU, De Novo Planning Group will collaborate with City staff to identify and address inconsistencies between the Zoning Code and the adopted General Plan.

In addition to required consistency updates - which is covered by the existing contract - this effort will identify opportunities for broader policy improvements to enhance clarity and alignment. Not unlike the Zoning Code, the City's General Plan has been developed on somewhat of an ad hoc basis over the decades to address specific needs. While the General Plan provides useful policy guidance, it could benefit from a more holistic update.
1 The June 13, 2023, City Council-adopted report is available for review here:
https://www.lagunabeachcity.net/govemment/departments/community-development/planning/current-projects/parking-masterplan 157
Contract Amendment for Comprehensive Zoning Code Update & Development of Objective Design Standards
July 22, 2025

Page 3 of 5 ends

5. Objective Design Standards for Single-Family and Two-Family Residential Projects. As an expansion to the original scope, subconsultant JKA will prepare objective design standards ("ODS") for single-family and two-family development, including hillside residential development. As discussed further herein, a two-phase approach is proposed for the development of the ODS. This task also includes staff training to support implementation following the adoption of the ODS document.

6. Project Management. Project management will include ongoing coordination between the consultant, City staff, and subconsultants. Activities will involve bi-weekly team conference calls and the preparation of monthly progress updates to ensure effective communication, schedule tracking, and timely delivery of project tasks.

In coordination with the ad hoc committee (Orgill and Whalen), staff has collaborated with the consultant to revise the project schedule. The updated schedule prioritizes the completion of tasks related to the adoption of objective design standards for single- and two-family residential projects, as well as updating parking standards.

Need for Objective Design Standards
In recent years, the State of California has enacted a series of housing laws aimed at increasing the state's housing inventory by reducing barriers to housing production. These laws limit a city's authority to deny certain eligible residential development projects based on standards that are subjective in nature and, instead, requires that such projects be reviewed using objective design standards. Objective design standards are defined under state law as, "standards that involve no personal or subjective judgement by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official prior to submittal." (California Government Code, Section 65913.4.) Some of the City's design review standards are subjective, which cannot be relied upon to ensure that resulting development is compatible with existing development patterns when the City's review authority is limited under state law.

Without objective design standards, the City has more limited review authority to shape the design of future multi-family and residential mixed-use projects and would only be able to review such projects against existing objective standards in the Zoning Ordinance and General Plan. City staff recommends developing objective design standards for single- and two-family residential development projects as well given the continuous development of state housing laws in an effort to assert more local control on design throughout Laguna Beach.
158
Contract Amendment for Comprehensive Zoning Code Update & Development of Objective Design Standards
July 22, 2025

Page 4 of 5 ends

Two-Phase Approach to Objective Design Standards (ODS)
The development of Objective Design Standards is proposed in two phases:
• Phase One - which will be led by City staff - implements the "box inside a box2 " concept, focusing
on basic form and massing standards. Staff anticipates that any development allowed under these standards without design review would be limited to a single story and at a height not to exceed 16 feet, and with greater setbacks than those required by the underlying zone. This phase does not address architectural styles or detailed building design elements. This phased approach will allow the City to more quickly adopt and implement objective design standards. Staff proposes to include the Phase One ODS in the Design Review ("DR") Efficiency Ordinance. If the City Council agrees, staff will develop the "box inside a box" ODS and include these development standards in a revised DR Efficiency Ordinance, which will then be transmitted to the California Coastal Commission for preliminary feedback before staff presents the ordinance to the Planning Commission and City Council for review and adoption.
• Phase Two, which is outlined in Task 5 of the proposed contract amendment (Attachment 1), will establish objective design standards for single-family and two-family development, including hillside developments.3 As part of this task, subconsultant JKA will develop ODS incorporating architectural character and style standards. The standards will be presented in multiple formatsincluding illustrative examples, zoning code-style text, and a checklist, and will cover up to seven (7) architectural styles. In addition, a map exhibit will be prepared to identify which architectural styles are permitted within each neighborhood, as applicable.

In parallel, staff is currently evaluating the use of computerized view analysis tools to objectively regulate private view impacts. Such a tool would rely on custom software developed for Laguna Beach and is outside of the scope of this contract amendment.

FINANCIAL ANALYSIS
On October 8, 2024, the City Council awarded a contract in the amount of $321,449 to De Novo Planning Group for the preparation of the CZCU. Of this amount, the Community Development Department has a total of $191,000 allocated in the Fiscal Year (FY) 2025-2026 Adopted Budget for this multi-year project.

De Novo Planning Group estimates a total fee of $388,300 to complete the additional tasks associated with the CZCU over the anticipated two-and-a-half-year duration, bringing the total contract cost to $709,749.

At this time, no additional appropriations are required. Staff will request funding for the remaining contract balance as part of the FY 2026-2027 budget cycle.
2 If state law requires the City to review a single- or two-family residential development project based only on objective design standards, the "box inside a box" concept will provide objective design standards that allow a certain form of development. Still, an applicant will have the option to pursue discretionary design review should the applicant want to exceed such allowed form of development. 3 De Novo Planning Group's existing scope of services already addresses objective design standards for projects involving three or more units.
159
Contract Amendment for Comprehensive Zoning Code Update & Development of Objective Design Standards
July 22, 2025

Page 5 of 5 ends

ENVIRONMENTAL ANALYSIS
The recommended action consists of organizational or administrative activities of the City that will not result in a direct or indirect physical change in the environment and/or the creation of government funding mechanisms or other government fiscal activities, which do not involve any commitment to any specific project that may result in a potentially significant physical impact on the environment, and therefore does not constitute a "project" within the meaning of the California Environmental Quality Act. (Public Resources Code Section 21065; 14 CCR Section 15378(b)(5) and (4), respectively.) Here, the proposed action includes approval of a professional service agreement and allocations of funds to prepare the Comprehensive Zoning Code Update without a commitment to specific development standards. At present, the environmental analysis of such development standards is too speculative for environmental analysis but will be considered once a draft of the update and recommendation is prepared.

ATTACHMENTS

1. Draft Amendment to Professional Services Agreement No. 24-70 (Pgs. 6-18)

2. Professional Services Agreement No. 24-70 (Pgs. 19-85) Report Prepared By:

Wendy Jung, Principal Planner
Coordinated With:

Jane Abzug, Assistant City Attorney
Michelle Bannigan, Director of Finance
Anthony Viera, Planning Manager
160

1. AMENDMENT NO. 1 TO

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE
Parties and Date.

CITY OF LAGUNA BEACH
AND

DE NOVO PLANNING GROUP
Attachment 1
This First Amendment to the Professional Services Agreement ("Amendment") is made and entered into this 22nd day of July, 2025 by and between the City of Laguna Beach ("City") and De Novo Planning Group ("Consultant"). City and Consultant are sometimes individually referred to as "Party" and collectively as "Parties" in this Amendment.

2. Recitals.

2.1 City and Consultant entered into that certain Professional Services Agreement dated October 11, 2024 ("Agreement"), whereby Consultant agreed to provide the professional services set forth in Appendix A "Scope of Services" of the Agreement to assist with the preparation of a Comprehensive Zoning Code Update ("CZCU").

2.2 The Agreement set forth a term for compensation in the amount not to exceed $321,449.

2.3 To date, City has paid Consultant a total compensation in the amount of $23,001.47.

2.4 City and Consultant now desire to amend the Agreement for the first time to revise and expand the scope of services associated with the CZCU as set forth in Exhibit 1 to Amendment No. 1. The consultant anticipates the entire effort (the original scope of work and the additional tasks) will take approximately 26 months (August 2025 to September 2027). The revised schedule prioritizes the adoption of the objective design standards for single-family and two-family residential projects and updating the parking standards. The restructured contract includes six additional tasks, with two optional sub tasks, that require additional funding in the amount of $388,300 to cover consultant costs.

3. Terms.

3.1 Revised Scope of Services. The Services to be provided by Consultant shall be revised to include the Services set forth in Exhibit "1" attached hereto and incorporated by this reference.

3.2 Contract Extension. The term of the Agreement shall be extended for one (1) year commencing on October 11, 2026 and ending on October 11, 2027.

3.3 Compensation. The total compensation shall increase by $388,300 so that the total amount paid for services rendered by Consultant under the Agreement shall not exceed the sum of $709,749.
6 161
Attachment 1

3.4 Continuing Effect of Agreement. Except as amended by this Amendment, all provisions of the Agreement shall remain unchanged and in full force and effect. From and after the date of this Amendment, whenever the term "Agreement" appears in the Agreement, it shall mean the Agreement as amended by this Amendment.

3.5 Adequate Consideration. The Parties stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment. Consultant further accepts the terms and conditions of this Amendment as full and final resolution of any and all claims, asserted or otherwise, arising out of or related to the subject of this Amendment and acknowledges that the compensation and/or additional time, if any, set forth herein is adequate and comprises the total compensation and/or time due for the change(s) included in this Amendment.

3.6 Counterparts. This Amendment may be executed in duplicate originals, each of which is deemed to be an original, but when taken together shall constitute but one and the same instrument.

IN WITNESS WHEREOF, the Parties hereto have executed this Amendment on the date first herein above written.

CITY OF LAGUNA BEACH DE NOVO PLANNING GROUP
By: By:

Ben Ritchie, Principal
Printed Name: Printed Name: ----------- Title: Title:

Dated: Dated: -------------- --------------
7 162
Attachment 1
EXHIBIT 1 TO AMENDMENT NO. 1
8 163
Attachment I
De Novo Planning Group
--------------------••· · ·
A Land Use Planning, Design, and Environmental Firm
June 13, 2025
Wendy Jung
City of Laguna Beach
Community Development Department
Principal Planner
(949) 497-0321
[email protected]
SUBJECT: Contract Modification #1 for the Comprehensive Zoning Code Update - Expanded Scope of Work
Dear Ms. Jung:

Per the City's request, our project team has revised and expanded the scope of work associated with the Comprehensive Zoning Code Update to include additional tasks. The details of this expanded scope of work, including the associated fees, are detailed below.

SCOPE OF WORK
Task 1. Parking Standards
For this effort, it is assumed that the parking recommendations will be developed for commercial areas not covered by the 2022 City of Laguna Beach Downtown Specific Plan (herein referred to as the Study Area). Primarily, this will include one block to each side of Pacific Coast Highway to the north and south of the Downtown Specific Plan boundaries (note: the final Study Area will be developed in conjunction with the City). To the north of the Downtown Specific Plan border, the Study Area will likely include the primarily commercial zones between Cliff Drive and McKnight Drive. To the south of the Downtown Specific Plan border, the Study Area will likely include the primarily commercials zones between Legion Street and Stonington Road/Cabrillo Way.

Task 1.1, Review Existing Planning Documents
Kittelson will review relevant City documents in order to gain an understanding of the existing parking regulations and administration requirements. Kittelson will evaluate and review current code requirements, regulations, restrictions, programs, and other standards for parking as related to nonresidential developments throughout the City. These documents will include, but are not limited to:
• Laguna Beach Parking and Transportation Demand Management Report (2023) • Laguna Beach Downtown Specific Plan (2022)
• Downtown Specific Plan Area Parking Actual Demand Study (2017)

DE NOVO PLANNING GROUP
180 E Main Street , Suite 108 I Tustin, CA 92780
[email protected] I (714) 453-7711
9 164
Attachment 1
De Novo Planning Group
--------------------••· · ·
A Land Use Planning, Design, and Environmental Firm
• Laguna Beach Municipal Code (2024)
In addition, Kittelson will review the parking regulations for other nearby cities that have a similar context.

Kittelson and the City will work together to identify comparable cities within Southern California and along the California coast, and the City will approve the cities selected for comparison before Kittelson commences on the parking reviews. These reviews will allow for a better understanding of the current state of the practice with similar parking regulations and requirements to Laguna Beach.

Deliverable: A technical memorandum listing the comparable cities, summarizing the planning documents reviewed and their applicability to Laguna Beach, in addition to a summary of the current parking requirements and regulations within the Study Area. Kittelson will submit a draft memorandum for review by City staff, respond to one set of consolidated comments, and then submit a final memorandum.

Task 1.2, Estimation of Current Parking Supply and Demand Kittelson will collect parking supply and occupancy counts throughout the Study Area to determine current parking conditions. Within the Study Area, the parking data will be aggregated into multiple parking districts based on the surrounding land use context and the current parking conditions. At this time, it is anticipated that up to six parking districts will be identified.

The following are the assumptions for this data collection :
• Supply:
o Kittelson will document the number of on-street and off-street public parking spaces within each parking district. This will be obtained through data provided by the City's parking apps (Laguna Beach Parking App using FrogParking data), supplemented by infield counts. Parking regulations, metered status, parking rates, and time limits will also be recorded.
o At up to 40 private parking lots where more than 10 parking spaces are provided, Kittelson will document the associated land use and restrictions/limitations to the use. • Demand:
o Current parking occupancy for the public and private parking facilities within each district will be collected for the following time periods:
■ Typical weekday during the summer and fall (collected every two hours between 12:00 PM and 8:00 PM)
■ Typical weekend day during the summer and fall (collected every two hours between 12:00 PM and 8:00 PM)
The locations of the 40 private parking lots will be developed in conjunction with City staff and will focus on areas where substantial parking is provided and/or areas where high parking occupancy has historically been observed.

DE NOVO PLANNING GROUP
180 E Main Street , Suite 108 I Tustin, CA 92780
[email protected] I (714) 453-7711
165
Attachment l
De Novo Planning Group
-------------------••· · ·
A Land Use Planning, Design, and Environmental Firm
Parking occupancy will the summarized by two-hour period and the hours with the peak parking occupancy will be determined for each district and for the City as a whole. Supply and occupancy data will be summarized in a series of maps and tables.

Deliverable: A technical memorandum summarizing the data collection process, parking supplies and parking demands for each parking zone and analysis period. The memorandum will include figures that illustrate the boundary of the parking districts and the locations where data collection was conducted, plus tables to present the results . Kittelson will submit a draft memorandum for review by City staff, respond to one set of consolidated comments, and then submit a final memorandum.

Task 1.3, Calculation of Blended Parking Requirement for Non-Residential Uses Consistent with the methodology established for the Downtown Specific Plan, Kittelson will calculate a blended parking requirement for non-residential uses within the Study Area. This will include the following elements:
• Built Parking Ratio
o Kittelson will work with City staff to obtain parcel-level land use data for the Study Area, for occupied and unoccupied buildings. The land use data will be aggregated by parking district and into residential and non-residential uses. o Within each parking district, the current parking supply (public and private spaces will be totaled.
o The built parking ratio (number of parking spaces per 1,000 square feet of uses) will be calculated based on the total square footage.
• Actual Parking Ratio
o Within each district, the parking demand will be totaled. o The actual parking ratio (number of parking spaces per 1,000 square feet of uses) will be calculated based on the occupied square footage.

The resulting parking ratios per parking district will be documented and compared for summer and nonsummer months. Based on the difference in ratios, Kittelson will recommend a blended parking rate, either at the parking district-level or for all commercial spaces outside of the Downtown Specific Plan area . It should be noted that different parking rates for each district may be recommended if significant variation in parking ratios are determined.

Deliverable: Summary report summarizing the findings from the two technical memoranda (see Tasks 1.1 and 1.2), the parking ratio calculations, and the recommended parking ratio(s). Included in this report will be an executive summary, the results of the data collection and analysis, recommendations and an appendix with the background data and calculations. Kittelson will submit a draft report for review by City staff, respond to up to two sets of consolidated comments, and then submit a final report.

DE NOVO PLANNING GROUP
180 E Main Street , Suite 108 I Tustin, CA 92780
[email protected] I (714) 453-7711
11 166
Attachment I
De Novo Planning Group
------------------• • · · ·
A Land Use Planning, Design, and Environmental Firm
Task 1.4, Administration and Meetings
Kittelson will attend a virtual kick-off meeting and virtual bi-weekly (every other week) meetings (up to 13 meetings) with the City to confirm details of the study (such as the Study Area, peer cities, data collection locations, and data collection times), review study process, discuss findings, and determine next steps. Kittelson will attend up to two Planning Commission or City Council meetings to present the results of the study.

Task 1.5, Other Parking Code Recommendations (Optional) In addition to updates to the non-residential parking standards, the City is also considering updates to several other elements of its parking code and regulations, including:
• Revising fractional parking requirements
• Revising intensification of use calculations
• Developing standards for on-site bicycle parking
• Revising the square footage used to calculate parking requirements • Accounting for ride hailing services
• Updating TDM regulations
• Evaluating zoning constraints
Kittelson will work with the City to determine the approach to address each element, and then identify recommended changes to the current parking codes and standards. This will include a review of comparable cities (see Task 1.1), plus calculations of the potential effects to the City's parking supply and occupancy conditions, as applicable. In addition, variations in the resulting parking supplies will be reviewed within the context of the new non-residential blended parking rate (see above). Note that for this work, it is anticipated that no new data collection will be conducted.

The existing parking standards and zoning code will be reviewed to identify which provisions should be retained, eliminated or revised, consistent with these recommendations . For each element, Kittelson will prepare red line versions for review and approval by City staff.

Kittelson will incorporate the additional efforts associated with this Optional task into the already-planned virtual kick-off meeting and virtual bi-weekly meetings. In addition, Kittelson will attend up to two additional Planning Commission or City Council meetings to present the results of the recommended code changes, given they may have a different approval process than the revised parking requirement itself.

Deliverable: Technical memorandum presenting the issues, recommendations and edited text for the applicable parking standard and regulations. Kittelson will submit a draft memorandum for review by City staff, respond to one set of consolidated comments, and then submit a final memorandum.

DE NOVO PLANNING GROUP
180 E Main Street , Suite 108 I Tustin, CA 92780
[email protected] I (714) 453 -7 711
12 167
Attachment 1
De Novo Planning Group
--------------------••· · ·
A Land Use Planning , Design, and Environmental Firm
Task 1.6, In-Lieu Parking Certificate Program Recommendations (Optional) The City currently has an in-lieu parking certificate program, under which new developments can pay an in-lieu fee instead of building code-required parking. Under the Comprehensive Zoning Code Update, the City will incorporate recommendations regarding the cost per certificate, strategies to have greater participation, and expand geographic areas of the program.

Kittelson will review the current in-lieu program, including documentation regarding how its fees were developed, number of developments that have utilized the program, applicable areas of the City, and other relevant information. This will also include a review of in-lieu programs established by comparable cities (see Task 1.1) and other Orange County cities, including their fee per space, and program eligibility and usage.

Using this data, Kittelson will work with the City to determine the approach to address each of the three program elements. In particular, Kittelson will calculate an updated cost per certificate based on data regarding the cost of improvements (e.g., the cost for publicly constructed parking spaces, or the costs for active transportation projects that would reduce parking demand), to be provided by the City. Kittelson will identify approaches to increase the usage of the program and geographic areas, reviewing historic data and discussions with City staff who administer the program . Note that for this work, it is anticipated that no new data collection will be conducted.

The language of the existing in-lieu parking certificate program will be reviewed to identify which provisions should be retained, eliminated or revised, consistent with these recommendations. For each element, Kittelson will prepare red line versions for review and approval by City staff.

Kittelson will incorporate the additional efforts associated with this Optional task into the already-planned virtual kick-off meeting and virtual bi-weekly meetings. In addition, Kittelson will attend up to two additional Planning Commission or City Council meetings to present the results of the recommended changes to the in-lieu parking certificate program, given that it may have a different approval process than the revised parking requirement itself.

Deliverable: Technical memorandum presenting the issues, recommendations and edited text for the inlieu parking certificate program. Kittelson will submit a draft memorandum for review by City staff, respond to one set of consolidated comments, and then submit a final memorandum.

DE NOVO PLANNING GROUP
180 E Main Street , Suite 108 I Tustin, CA 92780
[email protected] I (714) 453 - 7711
13 168
Attachment 1
De Novo Planning Group
A Land Use Planning, Design, and Environmental Firm
••••
Task 2. Update Commercial Zoning Districts
Task 2.1, Commercial Zoning Districts Memorandum
The existing chapters in Title 25 addressing Commercial Zoning Districts will be reviewed to identify which provisions should be retained, eliminated, or revised . De Novo will prepare a memorandum of issues and recommendations . The Commercial Zoning Districts Memorandum developed under this task will serve as a roadmap to guide the Commercial Zoning Districts Update.

Deliverables: Commercial Zoning Districts Memorandum
Task 2.2, Commercial Zoning Districts Update
De Novo will incorporate the direction provided by City Staff; input from the City Council, Planning Commission and Design Review Board; and public and stakeholder input received during Public Participation efforts included in Tasks 2.4, 2.5, and 2. 7 of the approved Scope of Work to prepare updates to the Commercial Zoning Districts as part of the comprehensive Zoning Code Update.

Deliverables: Administrative Draft Zoning Code Chapters 25.18, 25.19, 25.20, 25.21 and 25.25. Comments will be incorporated into the Draft Comprehensive Zoning Code Update.

Task 3. Update M-lA, Light Industrial Zone
Task 3.1, Community Outreach Workshop
Our team will host one community workshop focused on the Laguna Canyon community to receive input and recommendations of what the community would like to see developed in the M-lA Zone.

Deliverables: Facilitation of one community workshops, outreach materials, and summary of community workshop comments.

Task 3.2, M-lA Zone Memorandum
The existing Chapter 25.32, M-lA Light Industrial Zone will be reviewed to identify which provisions should be retained, eliminated, or revised. This review will also identify opportunities to provide residential uses and mixed-uses. De Novo will prepare a memorandum of issues and recommendations.

In addition to the feedback received as part of Task 3.1, this memorandum will consider the recommendations of the Laguna Canyon Planning Study. The M-lA Zone Memorandum developed under this task will serve as a roadmap to guide the M-lA Zone Update.

Deliverables: M-lA Zone Memorandum
Task 3.3, M-1A Zone Update
De Novo will incorporate the direction provided by City Staff; input from the City Council, Planning Commission and Design Review Board; and public and stakeholder input received during Public

DE NOVO PLANNING GROUP
180 E Main Street, Suite 108 I Tustin, CA 92780
[email protected] I (714) 453-7711
14 169
Attachment I
De Novo Planning Group
--------------------••·· ·
A Land Use Planning, Design, and Environmental Firm
Participation efforts included in Tasks 2.5, 2.6, and 2.7 of the approved Scope of Work, as well as Task 3.1 above, to prepare updates to Chapter 25.32, M-lA Light Industrial Zone, which will incorporate residential uses and mixed-uses, as well as limited commercial uses.

Deliverables : Administrative Draft Zoning Code Chapter 25.32. Comments will be incorporated into the Draft Comprehensive Zoning Code Update.

Task 4. General Plan Updates
In conjunction with the General Plan Updates related to the Comprehensive Zoning Code Update, De Novo will work with staff to identify any inconsistencies and opportunities for beneficial policy updates in the adopted General Plan. These will be updates in addition to the updates for consistency with the Comprehensive Zoning Code Update in order to provide better policy consistency and clarity in the adopted General Plan. This will be incorporated into Tasks 4.2, 4.5 and 6.3.

Deliverables : Administrative Draft General Plan Amendment; Screencheck and public review draft General Plan Amendment; Final General Plan Amendment in PDF and Microsoft Word Task 5. Objective Design Standards for Single-Family and Two-Family Residential Projects In addition to the existing scope of work, JKA shall provide objective design standards (ODS) for singlefamily, two-family, and hillside developments.

Task 5.1, Kick-Off Meeting and Tour
The JKA team will meet in-person with City staff to kick-off the task to review the scope of work and schedule. Following the meeting, the team will take a tour of the single-family residential neighborhoods and districts, key sites, and built-form issues.

Task 5.2, Single-Family Dwelling Areas Document Review and Summary JKA will review and summarize available information to support the development of the single-family dwelling (SFD) Objective Design Standards (ODS). This will include:
• Review and expansion of the City's matrix of the R-1, ABHSP, DCSP, Lagunita, STPSP, TAB, TISP, VC, R/HP, R-2, & R-3, development standards with a review and summary in matrix form of the City's Design Guidelines -A Guide to Residential Development; • Review and summary in matrix form of two (2) additional documents such as the Historic Resources Element of the General Plan;
• As provided by City staff, recent single-family dwelling (SFD) area projects (up to 10 projects); • Two (2) additional field observations to review and document SFD areas; and • Review up to three (3) SFD ODS from comparable jurisdictions with direction provided by the City.

JKA shall recommend jurisdictions that have a comparable scale of development to Laguna Beach.

The City will approve the cities selected for comparison before JKA commences on the reviews.

DE NOVO PLANNING GROUP
180 E Main Street, Suite 108 I Tustin, CA 92780
[email protected] I (714) 453-7711
15 170
Attachment 1
De Novo Planning Gr o up
--------------------••· · ·
A Land Use Planning, Design, and Environmental Firm
Based on the tour and document review, JKA will prepare an Existing Character Analysis and Recommendation report in digital slide presentation format that will include neighborhood analysis and architectural style analysis. The report will also include a draft map indicating the architectural styles that are appropriate for each Laguna Beach neighborhood.

Deliverables: Conditions Report & Recommendations
Task 5.3, Public Outreach
Our team will host one (1) joint study session with the Design Review Board and Planning Commission after the completion of the Conditions Report & Recommendations to receive input and recommendations of the SFD work-to-date. Additionally, our team will facilitate up to two (2) Design Review Board, Planning Commission, City Council, or joint body public study sessions to review work-todate and receive input and direction and attend two (2) public hearings for the adoption process.

Deliverables: Facilitation of three (3) public study sessions and attendance of two (2) public hearings, inclusive of outreach materials and summary of outreach Task 5.4, SFD Objective Design Standards
JKA will prepare the Administrative Draft Objective Design Standards (ODS) with character and style standards (illustrative, in zone text form, and with checklist; with up to seven (7) architectural styles). The ODS will include two illustrative case studies - one for a flat site and one for a hillside site, and the revised map exhibit, as appropriate identifying the styles permitted within each neighborhood (initially drafted as part of Task 5.2). Based on input and direction from staff, JKA will prepare the Public Review Draft SFD ODS. JKA will incorporate any revisions adopted during the decision-maker approval process into the Final SFD Areas ODS.

Deliverable: Administrative Draft SFD ODS; Public Review Draft SFD ODS; Final SFD ODS Task 5.5, Training
JKA will provide up to four (4) SFD Design Review Assists (two in-person, two virtual) with staff, after the adoption of the SFD Areas ODS document.

Task 5.6, Administration
In addition to the meetings assumed in Phase 5 of the scope of work, JKA will attend an additional four (4) check-in meetings, assuming one in-person meeting and three virtual.

Task 6. Project Management
Project management activities will include coordination between the De Novo management team and City staff, and between the De Novo management team and its subconsultants, and will involve bi-weekly

DE NOVO PLANNING GROUP
180 E Main Street , Suite 108 I Tustin, CA 92780
[email protected] I (71 4 ) 453-7711
16 171
Attachment I
De Novo Planning Group
------------------••· · ·
A Land U s e Planning, Design, a nd Environm e n t al Firm (every other week) team conference calls, and monthly progress reports, including the status of each task and deliverables, specifically for the expanded scope of work.

BUDGET
I
I
I Task 2, Update Commercial Zoning
Districts $16,000 I $16,000
I Task 3, Update M-lA Zone ~ -r _ I $17,000
Task 4, General Plan Updates 1 $7,500
I $17,000
I $7,SQQ
I Task 5, ODS for SFR J- r 61,o_o_o __ l $12,000 $173,000 Task 6, Project Management I $5,000 $5,000
. i
f •I ~ O ~ 61,~ 64_,o_o_o _ __,_$_3_1s_,5_o_o_
Task 1.5, Parking Code
(Optional) $40,000
l
~ask 1.6, In-Lieu Parking Progra:t$ 25,000
Optional)

SCHEDULE
I $3,QQQ $43,000
j · I $1.800 $26,800
The original proposal, dated June 27, 2024, identified a project schedule of 24 months. While some initial limited efforts related to the original scope of work were completed in late 2024/early 2025, most of the original scope of work still needs to be completed. The revised project schedule assumes that the entire project (the original scope of work and the additional tasks) will take approximately 26 months. The schedule has also been revised to prioritize the adoption of the SFR ODS and the updated Parking Standards.

DE NOVO P LANNING GROUP
180 E Main Street , Suite 108 I Tustin, CA 92780
[email protected] I (714) 453-7711
17 172
~
l
~
I
~
~
~ ! J J J
l
- I I I I
~ " i
- a j .le li
• J
i a
• j J
' . • ~ ~
j i __ J • .l! -
• ii ii I
0 ~
-
• ~
e
8 , j
l N . s
j i 0 .l!
1 ! I
z
~ i
a j .. N N I
• ! j
i a il J
j !
-t ~ !
.
~ - N !
s
-l - i
• li -l
- .
!
~ N J • 8 li
" J
! a -
1 .~
1 ~ • 1 !
j
]
! ., 1
l , " ~ - ~
173

AGENDA REPORT
Meeting Date
October 8, 2024
Attachment 2
Consent
6 l,CV
~pv1 'V~ 1) w
SUBJECT: PROFESSIONAL SERVICES AGREEMENT TO ASSIST WITH THE

PREPARATION OF A COMPREHENSIVE ZONING CODE UPDATE
RECOMMENDATION: It is recommended that the City Council:

1. Authorize the City Manager to execute a professional services agreement and any necessary amendments thereto, all in a form acceptable to the City Attorney, with De Novo Planning Group to assist with the preparation of a Comprehensive Zoning Code Update;

2. Appropriate $21,449 from anticipated mid-year savings to cover the remaining costs of the project beyond the budgeted $300,000; and

3. Find that this action is not a project subject to California Environmental Quality Act under State CEQA Guidelines Section 15378.

Appropriation: __ $_2=1..._,4_4_9 _________ Fund Name: __ G_e_n_er_·a_l _F_u_nd __ ~-+------ Submitted By:_.._.A .... Q"""' ld/.JA'---"'d...._._& ......... ich ......... w"""""-'--4k~ _ Approved: ~c...\l.J\ ~ David Contreras, Dire6tor of Dave Kiff,i ity Manager Community Development

SUMMARY OF THE MATTER
The City Council identified the "Comprehensive Code Update" as a key project during the 2022 Strategic Planning and Goal Setting Workshop and as a policy initiative during its 2024 Annual Planning Workshop held on January 19, 2024. At its adoption of the Fiscal Year 2023-24 Budget at the City Council meeting on June 13, 2023, the City Council approved funding of $300,000 to retain a consulting firm to assist the City in drafting a Comprehensive Zoning Code Update ("the Update"). Staff issued a Request for Proposal ("RFP") to seek proposals from qualified consultants to assist with the preparation of the Update. The City anticipates the effort will take approximately 24 months. In response to the RFP, the City received four proposals from separate firms and has identified De Novo Planning Group as the "most qualified bidder." A copy of De Novo Planning Group's proposal is included as Attachment 1. The City has prepared a proposed professional services agreement with De Novo Planning Group for the services. A copy of the proposed agreement is included as Attachment 2. The services, as discussed in more detail below, total $321,449.

DISCUSSION
On March 26, 2024, the City Council held a Study Session related to the scope of services for the Update, provided input, and directed staff to proceed by issuing the RFP for the Update. Councilmembers Orgill and Whalen were appointed to a City Council ad hoc committee tasked with collaborating with staff and consultants on the effort.

In accordance with Chapter 2.30 of the Laguna Beach Municipal Code ("LBMC"), City staff issued an RFP to assist with the preparation of the Update. The scope of services addresses the following: 1) Timeline and Milestones; 2) Assessment; 3) Environmental Review; 4) Recommendations; and 5) Deliverables. The goal is to execute a comprehensive update of the City's Zoning Code, which not only meets regulatory requirements but also responds to the needs of our residents and stakeholders while enhancing the 19 174
Professional Services Agreement for the Comprehensive Zoning Code Update October 8, 2024
Page2 of3
Attachment 2
requirements for development within residential and commercial zones. The consultant will conduct a public outreach program to maximize success and welcome input from stakeholders, design professionals, and the local community, and attend public hearings to respond to questions regarding the Update and environmental analysis related to this project.

The RFP was posted on PlanetBids on May 16, 2024, and concluded on June 27, 2024. The City received proposals from four firms, with the cost of the proposals ranging from $299,849 to $494,160. Following a review of all proposals, staff determined that three bidders were qualified. City staff reviewed each proposal and evaluated them based upon demonstrated understanding of the project scope, creativity of the submittal, proposed public outreach program and methods, experience working with the City, and experience with professional planning assignments of a similar nature and complexity. In August 2024, three firms were invited to an interview. After careful review, the selection committee affirmed De Novo Planning Group as the "most qualified bidder," as defined in Section 2.30.020 of the LBMC, based on the criteria set forth in LBMC Section 2.30.020. De Novo Planning Group will be partnering with subject-area specialists, JKA Architecture+ Urban Design and Kittleson & Associates, Inc., which specializes in objective standards, transportation, and parking.

The proposed agreement with De Novo Planning Group includes an optional task as identified in De Novo's proposal: optional Phase 7: Environmental Review. As part of Phase 7, which is included in the scope of work in the proposed agreement, the City will consider two, alternative environmental review options:

Option B (Initial Study, Negative Declaration or Mitigated Negative Declaration) for a total cost of $321,449; or Option C (Addendum) for a total cost of $317,369. For budgetary purposes, staff is requesting an allocation of $321,449.

It is recommended that the City Council authorize the City Manager to execute a professional services agreement, and any necessary amendments thereto, all in a form acceptable to the City Attorney, with De Novo Planning Group to prepare the Comprehensive Zoning Code Update and the required environmental review.

ENVIRONMENTAL ANALYSIS
The proposed action is not subject to the California Environmental Quality Act (Public Resources Code Section 21000 et seq.) ("CEQA") because it does not qualify as a "project" under CEQA, as defined in Section 15378 of the CEQA Guidelines. The proposed action includes approval of a professional service agreement to prepare the Comprehensive Zoning Code Update. Such action will not result in a physical change in the environment, and therefore is not subject to CEQA.

FINANCIAL ANALYSIS
De Novo Planning Group estimates a total fee of $321,449 to complete the Comprehensive Zoning Code Update, including a full CEQA analysis, which may involve preparing an Initial Study, Negative Declaration, or Mitigated Negative Declaration. The total project budget is $300,000; however, the proposed contract award exceeds this amount by $21,449. 20 175
Attachment 2
Professional Services Agreement for the Comprehensive Zoning Code Update October 8, 2024
Page3 of3
To address this shortfall, an appropriation of $21,449 is requested, which will be covered by anticipated mid-year savings. Depending on the final scope of work and environmental review outcomes, the total project cost may be reduced, resulting in potential savings.

ATTACHMENTS

1. De Novo Planning Group Proposal (Pgs. 4-50)

2. Professional Services Agreement (Pgs. 51-66)
Report Prepared By:

Wendy Jung, Acting Zoning Administrator
21 Coordinated With:

Jane Abzug, Deputy City Attorney
Matthew Schneider, Assistant Director of
Community Development
176

PROFESSIONAL SERVICES AGREEMENT BETWEEN

THE CITY OF LAGUNA BEACH

AND DE NOVO PLANNING GROUP
Attachment 2
THIS PROFESSIONAL SERVICES AGREEMENT ("Agreement") is made and entered into this 11 th day of October, 2024 ("Effective Date"), by and between the City of Laguna Beach, a Municipal Corporation, hereinafter referred to as the "CITY," and De Novo Planning Group, a California Stock Corporation, hereinafter referred to as "CONSULTANT." CITY and CONSULTANT are collectively refe1Ted to as "PARTIES" herein.

RECITALS
WHEREAS, CITY issued a Request for Proposals on or around May 16, 2024, soliciting qualified bidders to assist with the preparation of a Comprehensive Zoning Code Update and thereafter determined that CONSULT ANT is the most qualified bidder for this project; and WHEREAS, the CITY desires to engage CONSUL TANT to assist with the preparation of a Comprehensive Zoning Code Update; and
WHEREAS, CONSULTANT's scope of services are more fully identified in Appendix A, "Scope of Services," attached hereto and incorporated by reference into this Agreement; and WHEREAS, CONSULT ANT is qualified and agreeable to render the professional services desired by the CITY pursuant to this Agreement; and
NOW, THEREFORE, in consideration of the foregoing and of the mutual promises hereinafter expressed and intending to be bound hereby, the Parties hereto do mutually agree as follows:

Article 1.

PART I

FUNDAMENTAL TERMS
Engagement of CONSULTANT
The CITY hereby agrees to engage CONSULT ANT to perform the professional services set forth in Appendix A "Scope of Services" of this Agreement, and CONSUL TANT agrees to pe1form those services in accordance with the terms and conditions of this Agreement.

Article 2. Scope of Services
In compliance with all terms and conditions of this Agreement, CONSULTANT shall perform all work necessary to complete, in a manner satisfactory to the CITY, the services described and set forth in Appendix A, "Scope of Services", attached hereto and by reference into this Agreement.

Professional Services Agreement - De Novo Planning Group 22 Agreement No. 24-70
177
Attachment 2
Article 3. Time of Performance
The services of CONSULT ANT are to commence upon the Effective Date first set forth above, and shall terminate Twenty-Four (24) months from the Effective Date, unless terminated earlier as set forth herein. This Agreement may be extended by mutual, written consent between the Parties for two (2) additional successive terms of six (6) months.

Article 4. Payment and Limitation of Cost
The CITY shall compensate CONSULT ANT for services performed under Article 2, as further defined in Appendix A, in accordance with the following schedule:

CITY shall pay CONSULTANT an amount not to exceed Three-Hundred Twenty-One Thousand Four Hundred Forty-Nine Dollars and Zero cents ($321,449) for the services performed under this Agreement. Payments will be made to the CONSULT ANT on a monthly basis based on the services performed during the preceding billing period, as further detailed below.

In order to receive payments, CONSULTANT shall submit to the CITY periodic invoices.

The invoice shall describe the services performed with specificity, the amount invoiced to date, and shall include such other documentation as may be necessary or requested by the CITY to demonstrate that appropriate progress has been made toward completion of the services.

Adjustments of total cost of services by up to 10% of the original contract amount will be permitted when CONSULT ANT establishes, and the CITY agrees in writing, that there has been, or is to be, a significant change in:
a.
b.

C.

Article 5.

The scope, complexity or character of the services to be performed; The conditions under which the work is required to be performed; or The duration of work if the change from the time period specified in this Agreement for completion of the work wa1rnnts such adjustment in accordance with Part II, Section 4, Paragraph 4.14, Extension of Time for Delay.

Attachments
The provision set forth in Part II, General Provisions, and Appendix A, "Scope of Services," are hereby incorporated by reference and made a part hereof.

Article 6. Integration
This Agreement represents the entire understanding of the CITY and CONSULT ANT as to those matters contained herein. No prior oral or written understanding shall be of any force or effect with regard to those matters covered by this Agreement. This Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements, and understandings, if any, between the parties, and none shall be used to interpret this Agreement.

Professional Services Agreement - De Novo Planning Group 23

Page 2 of 16 ends

178
Attachment 2
IN WITNESS WHEREOF, persons executing this Agreement warrant and represent that they are authorized to do the same on behalf of the Parties hereto and are authorized to bind those Parties to the terms and conditions of this Agreement.

CITY OF LAGUNA BEACH CONSULTANT
Dave Kiff, City Manager
Title Principal
Address 1020 Suncast Lane
Suite 106
El Dorado Hills, CA 95762
APPROVED AS TO FORM:

Professional Services Agreement - De Novo Planning Group Page 3 of 16 24 179
SECTION ONE:

PART II

GENERAL PROVISIONS

SERVICES OF CONSULTANT
Attachment 2

1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, CONSULT ANT shall perform all work necessary covered by this Agreement in a manner satisfactory to the CITY. This Agreement includes the services described and set forth in Appendix A, "Scope of Services" of the Agreement, attached hereto and by reference incorporated herein and made a part hereof, which may be referred to as "services."

1.2 Changes and Additions to Scope of Services. The CITY shall have the right at any time during the pe1formance of the Services, without invalidating this Agreement, to order extra services beyond that specified in Appendix A of this Agreement, or make changes by altering, adding to, or deducting from said services. No payment for extra services caused by a change in scope or complexity of work shall be made, unless and until such extra services and a price therefore have been authorized in writing and approved by the CITY. Such written approval shall set forth the changes of work, extension of time for preparation, and adjustment of the fee to be paid by the CITY to CONSUL TANT. No claim for said additional work shall be made unless such additional work has been specifically authorized in writing by the CITY.

1.3 Specifications. All specifications, manuals, or standards, either attached to this Agreement or incorporated herein by reference, are deemed to be the version in effect as of the date of this Agreement and are binding as to the performance of the work in this Agreement unless they are changed by written amendment and this Agreement is modified in writing to incorporate such changes. Any changes are subject to CITY's written approval.

1.4 Standard of Performance. CONSULT ANT hereby represents and warrants that it has the experience necessary to undertake the services to be provided herein. In light of such status and experience, CONSULTANT hereby covenants that it shall follow customary good professional standards in performing all services required hereunder and shall perform all work in a manner reasonably satisfactory to the CITY. CONSULT ANT shall be responsible to ensure that all work performed, including by its employees if any, is performed to the standards set forth in this Agreement and that such work complies with customary commercial standards that would reasonably and ordinarily be expected from a qualified. skilled and experienced person engaged in a similar type of undertaking under the same or similar circumstances, and conforms to any requirements of appropriate governmental agencies and applicable laws ordinances, codes and regulations of the federal, state and local governments in effect at the time such services are pe1formed.

Notwithstanding any other provision herein, CONSUL TANT agrees to perform all work to the satisfaction of the CITY within the time specified. If the CITY reasonably determines that the work is not satisfactory, the CITY shall have the right to take appropriate action, including but not limited to: (i) meeting with CONSULTANT to review the quality of the work and resolve matters of concern; (ii) requiring CONSUL TANT to repeat unsatisfactory work at no additional charge until it is satisfactory; (iii) suspending the delivery of work to CONSULT ANT for an indefinite time; (iv) withholding payment; and (v) terminating this Agreement as hereinafter set forth.

Professional Services Agreement- De Novo Planning Group 25

Page 4 of 16 ends

180
Attachment 2

1.5 Licenses, Permits, Fees and Assessments. CONSUL TANT shall obtain at its sole cost and expense all licenses, permits, and approvals that may be required by law for the performance of the Services required by this Agreement. CONSULTANT shall have the sole obligation to pay any fees, assessments, and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for CONSUL TANT's performance of the Services required by this Agreement, and shall indemnify, defend, and hold harmless the CITY against any such fees, assessments, taxes, penalties, or interest levied, assessed, or imposed against the CITY thereunder.

1.6 Personnel. CONSULTANT represents that it employs, or will employ, at its own expense, personnel required in perfonning the services required under this Agreement. All of the services required hereunder will be performed by CONSULTANT and all personnel engaged in the work shall be fully qualified and be authorized or permitted under state and local law to perform such services. This Agreement contemplates the personal services of CONSUL TANT and CONSUL TANT's employees, and it is recognized by the Parties hereto that a substantial inducement to the CITY for entering into this Agreement was, and is, the professional reputation and competence of CONSULTANT and CONSULTANT's employees. Neither this Agreement nor any interest therein may be assigned by CONSUL TANT, except upon written consent of the CITY.

1.7 Prohibition Against Subcontracting or Assignment. CONSULT ANT shall not contract with any other entity to perform in whole or in part the Services required hereunder without the express written approval of the CITY, and excepting any services identified in Appendix A, "Scope of Services", and excepting minor incidental services including, but not limited to couriers and reprographics services. In addition, neither the Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of the CITY.

In the event of any unapproved transfer, the CITY may void the Agreement at the CITY's option in its sole and absolute discretion.

SECTION TWO: INSURANCE

2.1 Insurance. Without limiting CONSULT ANT's indemnification obligations, CONSULTANT shall procure and maintain, at its sole cost and for the duration of this Agreement, insurance coverage as provided below, against all claims for injuries against persons or damages to property which may arise from or in connection with the performance of the work hereunder by CONSULT ANT, its agents, representatives, employees, and/or subconsultants. In the event that CONSULT ANT subcontracts any portion of the work in compliance with this Agreement, the contract between CONSULT ANT and such subconsultant shall require the subconsultant to maintain the same policies of insurance that CONSULT ANT is required to maintain pursuant to this Section 2.1. If the existing policies do not meet the Insurance Requirements set forth herein, CONSULT ANT agrees to amend, supplement or endorse the policies to do so.

2.1.1 Insurance Coverage Required. The policies and amounts of insurance required hereunder shall be as follows:

Professional Services Agreement- De Novo Planning Group 26

Page 5 of 16 ends

181
Attachment 2
(1) General Liability Insurance. Commercial General Liability Insurance which affords coverage at least as broad as Insurance Services Office "occurrence" form CG 00 01 including completed operations, with limits of liability of not less than $1,000,000 per occun-ence and $2,000,000 annual aggregate for liability arising out of CONSUL TANT's performance of this Agreement. The limits shall be provided by either a single primary policy or combination of policies. If limits are provided with excess and/or umbrella coverage, then the limits combined with the primary will equal the minimum limits set forth above. If written with an aggregate, then the aggregate shall be double the each occun-ence limit. (2) Automobile Liability Insurance. Automobile Liability Insurance with a limit of liability of not less than $1,000,000 each occurrence and $1,000,000 annual aggregate. The limits shall be provided by either a single primary policy or combination of policies. If limits are provided with excess and/or umbrella coverage, then the limits combined with the primary will equal the minimum limits set above. Such insurance shall include coverage for all "owned," "hired" and "non-owned" vehicles, or coverage for "any auto." (3) Workers' Compensation Insurance. Workers' Compensation Insurance, as required by the State of California and Employer's Liability Insurance with a limit of not less than $1,000,000 each accident for bodily injury and $1,000,000 each employee for bodily injury by disease. Said insurance shall cover all employees of CONSULT ANT providing any service in the pe1formance of this agreement. A statement on an insurance certificate will not be accepted in lieu of the actual endorsement unless CONSULT ANT' s insurance carrier is the State of California Insurance Fund (SCIF) and the endorsement numbers 2570 and 2065 are referenced on the certificate of insurance.

Workers' Compensation is not required for sole proprietors or a partnership with no employees.

However, for sole proprietors or a partnership, CONSUL TANT must complete a "Workers' Compensation Declaration." This form may be obtained from the CITY staff. (4) Professional Liability Insurance. Professional Liability Insurance with minimum limits of $1,000,000 each claim. Covered professional services shall include all work performed under this Agreement and delete any exclusion that may potentially affect the work to be performed.

2.1.2 Evidence of Insurance. CONSULT ANT, concurrently with the execution of the Agreement, and as a condition precedent to the effectiveness thereof, shall deliver either ce1iified copies of the required policies, or original certificates and endorsements on forms approved by the CITY. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15) days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the CITY. If such coverage is cancelled or reduced, CONSULT ANT shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the CITY evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies.

Original, signed insurance certificates and endorsements must be sent via email from CONSUL TANT's insurance broker/agent to the CITY.

Professional Services Agreement- De Novo Planning Group 27

Page 6 of 16 ends

182
Attachment 2
The CITY project title or description MUST be included in the "Description of Operations" box on the certificate.

Certificate Holder:

City of Laguna Beach, California

2.2 Endorsements.

Insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been approved by the City in writing.

2.2.1 The insurance coverage required by Section 2.1. l Commercial General Liability shall contain the following provisions or be endorsed to provide the following:

Additional Insured: The CITY, its employees, officers, elected or appointed officials or both, officers, employees, volunteers, boards, agents and representatives shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Agreement.

Additional Insured Endorsements shall not:

1. Exclude "Contractual Liability;"

2. Restrict coverage to the "Sole" liability of CONSUL TANT;

3. Exclude "Third-Party-Over-Actions;" and

4. Contain any other exclusions contrary to the Agreement.

Primary Insurance: This insurance shall be primary and any other insurance whether primary, excess, umbrella or contingent insurance, including deductible, or self-insurance available to the insureds added by endorsement shall be in excess of and shall not contribute with this insurance.

A statement on an insurance certificate will not be accepted in lieu of the actual endorsement.

2.2.2 The policy or policies of insurance required by Section 2.1.3 Workers' Compensation shall be endorsed as follows:

Waiver of Subrogation: A waiver of subrogation stating that the insurer waives all rights of subrogation against the indemnified parties.

2.2.3 Any deductible in excess of $50,000 and/or Self-Insured Retentions must be approved in writing by the CITY.

2.2.4 Acceptable Insurance. Each policy shall be from a company with current A.M.

Best's rating of A VII or higher and authorized to do business in the State of Califomi~ or otherwise allowed to place insurance through surplus lines brokers under applicable provisions of Professional Services Agreement - De Novo Planning Group 28

Page 7 of 16 ends

183
Attachment 2
the California Insurance Code or any federal law. Any other rating must be approved in writing by the CITY.

2.2.5 Insurance of Subconsultants. CONSUL TANT shall be responsible for causing subconsultants to maintain the same types and limits of coverage in compliance with this Agreement, including naming the CITY as an additional insured to the subconsultants' policies.

2.3 Notice of Cancellation. Required insurance policies shall not be cancelled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the CITY; except ten (10) days written notice of cancellation shall be provided for non-payment of premium.

2.4 Other Insurance. Such other policies of insurance as may be required in the Special Provisions attached hereto.

2.5 Contractual Liability. Notwithstanding any other provision herein, the coverage provided shall also apply to the obligations assumed by CONSULT ANT under the indemnity provisions of this Agreement.

2.6 Claims Made Policies "aka: Tail Coverage." If coverage is written on a claims-made basis, the retroactive date on such insurance and all subsequent insurance shall coincide or precede the effective date of the initial Agreement with the CITY and continuous coverage shall be maintained or an extended reporting period shall be exercised for a period of at least three (3) years from termination or expiration of this Agreement. Upon expiration or termination of coverage of required insurance, CONSULT ANT shall procure and submit to the CITY evidence of "tail" coverage or an extended reporting coverage period endorsement for the period of at least three (3) years from the time that all work under this Agreement is completed.

2.7 Waiver of Subrogation. Required insurance coverages shall not prohibit CONSULTANT from waiving the right of subrogation prior to a loss. CONSULT ANT shall waive all rights of subrogation against the indemnified parties and policies required under this Agreement shall contain or be endorsed to contain such a provision.

2.8 Failure to Maintain Coverage. CONSUL TANT agrees to suspend and cease all operations hereunder during such period of time as the required insurance coverage is not in effect and evidence of insurance has not been furnished to the CITY and provide the CITY written notice of the same within 24 hours of suspending and ceasing all operations. The CITY shall have the right to withhold any payment due CONSULT ANT until CONSUL TANT has fully complied with the _insurance provisions of this Agreement.

In the event that CONSULTANT's operations are suspended for failure to maintain required insurance coverage, CONSULT ANT shall not be entitled to an extension of time for completion of the work because of production lost during suspension. Failure to maintain the required insurance coverage shall constitute good cause for termination.

SECTION THREE: INDEMNIFICATION
Professional Services Agreement- De Novo Planning Group 29

Page 8 of 16 ends

184
Attachment 2

3.1 Indemnification. To the full extent allowed by law, CONSUL TANT shall indemnify, defend with counsel acceptable to the CITY and hold harmless the CITY and its officers, officials, employees, agents and volunteers ("Indemnitees") from and against any and all liability, loss, damage, claims, suits, actions, arbitrations proceedings, administrative proceedings, regulatory proceedings, civil penalties and fines, expenses and costs (including, without limitation, attorney's fees and costs and fees of litigation) (collectively, "Liability") of every nature, whether actual, alleged or threatened, arising out of or in connection with CONSULT ANT's performance of the services provided under this Agreement or its failure to comply with any of its obligations contained in this Agreement, except such Liability caused by the sole negligence or willful misconduct of the CITY.

3.1.1 CONSULT ANT's obligation to defend and indemnify shall not be excused because of CONSULTANT's inability to evaluate Liability or because CONSULTANT evaluates Liability and determines that CONSULTANT is not liable to the claimant. CONSULTANT must respond within 30 days to the tender of any claim for defense and indemnity by the CITY, unless this time has been extended by the CITY. If CONSUL TANT fails to accept or reject a tender of defense and indemnity within 30 days, in addition to any other remedy authorized by law, so much of the money due CONSUL TANT under and by virtue of this Agreement as shall reasonably be considered necessary by the CITY, may be retained by the CITY until disposition has been made of the claim or suit for damages, or until CONSULT ANT accepts or rejects the tender of defense, whichever occurs first.

3.1.2 With respect to third party claims against CONSUL TANT, CONSULT ANT waives any and all rights of any type to express or implied indemnity against the lndemnitees.

3.1.3 Notwithstanding the forgoing, to the extent this Agreement is a "construction contract" as defined by California Civil Code Section 2783, as may be amended from time to time, such duties of CONSUL TANT to indemnify shal I not apply when to do so would be prohibited by California Civil Code Section 2782.

3.1.4 Notwithstanding the foregoing, to the extent that this Agreement includes design professional services under Civil Code Section 2782.8, as may be amended from time to time, such duties of CONSULT ANT to indemnify shall only be to the full extent permitted by Civil Code Section 2782.8.

3.1.5 If any term of portion of this Section 3.1 is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, said section shall be interpreted to allow the broadest indemnity permitted by law.

SECTION FOUR: LEGAL RELATIONS AND RESPONSIBILITIES

4.1 Independent Consultant. It is expressly understood that in the performance of the services under the Agreement, CONSULT ANT shall be, and is, an independent CONSULTANT, and is not an agent or employee of the CITY. The CITY shall not in any way or for any purpose become or be deemed to be a paiiner of CONSULTANT in its business or otherwise, or a joint venturer, or a member of any joint enterprise with CONSUL TANT. CONSULT ANT shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of the CITY. CONSULTANT has and shall retain the right to exercise full control and supervision of the Professional Services Agreement- De Novo Planning Group Page 9 of 16 30 185
Attachment 2
services, and full control over the employment, direction, compensation and discharge of all persons assisting CONSULT ANT in the performance of required services. CONSUL TANT shall be solely responsible and hold the CITY harmless for all matters relating to the payment of CONSULT ANT's employees, including compliance with Social Security withholdings and all other regulations governing such matters. Neither CONSULT ANT nor any of CONSULTANT's employees shall, at any time, or in any way, be entitled to any sick leave, vacation, retirement or other fringe benefits from the CITY; and neither the CITY nor any of its employees shall be paid by the CITY time and one-half for working in excess of forty (40) hours in any one week. Neither CONSULTANT nor any of CONSULTANT's employees shall be included in the competitive service, have any prope1ty right to any position, or any of the rights an employee may have in the· event of termination of this Agreement.

4.2 Non-Discrimination and Equal Employment Opportunity. During its performance under this Agreement, CONSULT ANT agrees as follows:

4.2.1 Equal Employment Opportunity. In connection with its performance under this Agreement, CONSULT ANT shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, age, marital status, sexual orientation, AIDS or AIDS-related symptoms (including HIV positive findings), physical disability, mental disability, mental condition, family care leave, sexual orientation, ancestry or national origin. Actions encompassed by this prohibition shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment, or recruitment advertising; layoff or termination; rate of pay, or other forms of compensation; and selection for training, including apprenticeship.

4.2.2 Sanctions for Noncompliance. In the event of CONSULT ANT's noncompliance with the non-discrimination provisions of this Agreement, CONSUL TANT agrees that the CITY shall be authorized to impose such sanctions or penalties as the CITY may determine to be appropriate, including, but not limited to 1) withholding of payments to CONSULTANT hereunder until CONSUL TANT complies with all applicable requirements and obligations, and/or 2) cancellation, termination or suspension of the Agreement, in whole or in part.

4.3 Proprietary Information. No reports, maps or other documents produced in whole or in part under this Agreement shall be the subject of an application for copyright by or on behalf of CONSULT ANT. All proprietary information developed specifically for the CITY by CONSULT ANT in connection with, or resulting from, this Agreement, including but not limited to inventions, discoveries, improvements, copyrights, patents, maps, reports, textual material or software programs, but not including CONSULTANT's underlying materials, software, or knowhow, shall be the sole and exclusive property of the CITY, and are confidential and shall not be made available to any person or entity without the prior written approval of the CITY.

CONSULT ANT agrees that the compensation to be paid pursuant to this Agreement includes adequate and sufficient compensation for any proprietary information developed in connection with or resulting from the performance of CONSULTANT's services under this Agreement.

CONSULT ANT further understands and agrees that full disclosure of all proprietary information developed in connection with, or resulting from, the performances of services by CONSUL TANT under this Agreement shall be made to the CITY, and that CONSULT ANT shall do all things necessary and proper to perfect and maintain ownership of such proprietary information by the CITY.

Professional Services Agreement- De Novo Planning Group 31

Page 10 of 16 ends

186
Attachment 2

4.4 Use of Patented Materials. CONSULT ANT represents that the services provided hereunder do not infringe upon any patent, trademark, copyright, trade secret or other intellectual property rights of a third party. CONSUL TANT shall assume all costs arising from the use of patented or copyrighted materials, including but not limited to equipment, devices, processes, and software programs, used or incorporated in the services or work performed by CONSULTANT under this Agreement. CONSULTANT shall indemnify, defend, and save the CITY harmless from any and all suits, actions, or proceedings of every nature for or on account of the use of any patented or copyrighted materials.

4.5 Retention of Funds. CONSULTANT hereby authorizes the CITY to deduct from any amount payable to CONSULT ANT (where arising out of the Agreement or otherwise) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate the CITY for any losses, costs, liabilities or damages suffered by the CITY, and all amounts for which the CITY may be liable to third parties, by reason of CONSULT ANT's negligent acts, errors, or omissions, or willful misconduct in pe1forming or failing to perform CONSULT ANT's obligations under this Agreement. The CITY in its sole and absolute discretion, may withhold from any payment due to CONSULT ANT, without liability for interest, an amount sufficient to cover such claim or any lien. The failure of the CITY to exercise such right to deduct or withhold shall not act as a waiver of CONSUL TANT's obligation to pay the CITY any sums CONSULTANT owes the CITY.

4.6 Termination for Convenience of the CITY. The CITY may terminate this Agreement at any time by giving written notice of CONSULT ANT of such termination. In that event, all finished or unfinished documents and other materials shall, at the option of the CITY, become the CITY's property. If this Agreement is terminated by the CITY as provided herein, then CONSUL TANT will be paid an amount which bears the same ratio to the total compensation as the services actually performed bear to the total services of CONSULT ANT covered by this Agreement, less payments of compensation previously made.

4.7 Termination of Agreement for Cause. In addition to the CITY's rights under Section 4.6, the CITY may, subject to the provisions of Paragraph 4. 7 .2, by written notice to CONSULT ANT, terminate the whole or any part of this Agreement in any of the following circumstances: (1) if CONSULTANT fails to perform the services called for by this Agreement within the time(s) specified herein or any extension thereof; or (2) if CONSULT ANT fails to perform the services called for by this Agreement or so fails to make progress as to endanger performance of this Agreement in accordance with its terms, and in either of these two circumstances does not con-ect such failure within a period of ten (10) days ( or such longer period as the CITY may authorize in writing) after receipt of notice from the CITY specifying such failure.

4.7.1 In the event the CITY terminates this Agreement in whole or in part as provided in this section, the CITY may procure, upon such terms and such manner as it may determine appropriate, services similar to those described in this Agreement.

4.7.2 Except with respect to defaults of subconsultants, CONSULTANT shall not be liable for any excess costs if the failure to perform this Agreement arises out of causes beyond the control and without the fault or negligence of CONSUL TANT. Such causes may include, but are not restricted to, acts of God or of the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes and unusually severe Professional Services Agreement- De Novo Planning Group 32

Page 11 ends

187
Attachment 2
weather; but in every case, the failure to perform must be beyond the control of, and ,:vithout the fault or negligence of CONSULT ANT.

4. 7.3 Upon receipt of notice of termination from the CITY, CONSULT ANT shall immediately stop its services, unless otherwise directed, and deliver to the CITY all data, drawing, reports, estimates, summaries and such other information and materials as may have been accumulated by CONSULT ANT in the performance of this Agreement, whether completed or in process. Upon termination, CONSULTANT shall be paid the value of the work performed, less payments of compensation previously made.

4.8 Waiver. No delay or omission in the exercise of any right or remedy by a non-defaulting paity on any default shall impair such right or remedy or be construed as a waiver. A party's consent to or approval of any act by the other party requiring the party's consent or approval shall not be deemed to waive or render unnecessary the other party's consent to or approval of any subsequent act. Any waiver by either party of any default must be in writing.

4.9 Legal Actions. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted or maintained in the Municipal and Superior Courts of the State of California in the County of Orange, or in any other appropriate couit with jurisdiction in such County, and CONSULTANT agrees to submit to the personal jurisdiction of the court. If any claims related to the performance hereunder be asserted against either patty hereto, then the party claimed against shall receive reasonable assistance from the other.

4.10 Rights and Remedies are Cumulative. The rights and remedies of the Parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any rights or remedies for the same default or any other default by the other party.

4.11 Attorneys' Fees. In any action between the Parties hereto seeking enforcement of any of the terms of provisions of this Agreement or in connection with the performance of the work hereunder, the party prevailing in the final judgment in such action or proceeding, in addition to any other relief which may be granted, shall be entitled to have and recover from the other party its reasonable costs and expenses, including, but not limited to, reasonable attorneys' fees, expert witness fees and courts costs. If either party to this Agreement is required to initiate or defend litigation with a third party because of the violation of any term or provision of this Agreement by the other party, then the party so litigating shall be entitled to its reasonable attorneys' fees and costs from the other party to this Agreement.

4.12 Jurisdiction. This Agreement shall be interpreted in accordance with the statutes and laws of the State of California, the City of Laguna Beach and any other government agency applicable to the subject of this Agreement and the performance hereunder.

4.13 Non-liability of Citv Officers and Employees. No officer, official, employee, agent, representative, or volunteer of the CITY shall be personally liable to CONSULT ANT, or any successor in interest, in the event of any default or breach by the CITY, or for any amount which may become due to the CITY or its successor, or for breach of any obligation of terms of this Agreement.

Professional Services Agreement - De Novo Planning Group 33

Page 12 of 16 ends

188
Attachment 2

4.14 Extension of Time for Delay.

4.14.1 If the work is delayed at any time by reason of a suspension ordered by the CITY or because of any other act of the CITY, or because of neglect by the CITY without contributory fault or neglect on the part of CONSUL TANT, or if the work should be delayed at any time by reason of strikes, acts of God, the public enemy, acts of the CITY, fire, floods, epidemics, quarantine restrictions, freight embargoes, abnormal force, violence of the elements, or for any other unforeseen cause beyond the control and without the fault or negligence of CONSUL TANT, or for any other reason which in the opinion of CONSULT ANT is proper justification for such delay, then CONSULTANT shall be entitled to an extension of time equivalent to the time actually lost by such delay.

4.14.2 CONSUL TANT shall file a written request with the CITY for extension of time within ten (10) days following the beginning of such delay, and failure to do so shall constitute a waiver thereof, provided that in case of a continuing cause of delay, only one claim will be necessary. The CITY shall ascertain the facts and the extent of delay, and extend the time for pe1forming the services for the period of the enforced delay when and if in the judgment of the CITY such delay is justified. The CITY's determination shall be in writing and be final and conclusive upon the Parties to this Agreement.

4.14.3 A request for an extension of time or the granting of an extension of time shall not constitute a basis for any claim against the CITY for additional compensation. CONSULT ANT shall be deemed to have waived any claims for additional compensation and does hereby so waive any such claims unless he shall, at the time of filing a request for an extension of time, likewise file a claim for additional compensation on account of such delay.

4.15 Interests of Members of the CITY and Others. To the extent prohibited by applicable law, no officer, member or employee of the CITY and no member of its governing body nor other public official of the governing body of the locality or localities in which the work pursuant to this Agreement is being carried out, who exercises any functions or responsibilities in the review or approval of the undertaking or carrying out of the aforesaid work, shall (1) participate in any decision relating to this Agreement which affects his or her personal interest or the interest of any corporation, partnership, or association in which he or she has, directly or indirectly, any interest; or (2) have any interest, direct or indirect, in this Agreement or the proceeds thereof during his or her tenure or for one year thereafter.

4.16 Interest of CONSULTANT. CONSULTANT hereby covenants that it has, at the time of the execution of this Agreement, no interest, and that it shall not acquire any interest in the future, direct or indirect which would conflict in any manner or degree or be inconsistent with the performance of services required to be performed pursuant to this Agreement. CONSULT ANT further covenants that in the performance of this work no person having any such interest shall be employed.

4.17 Covenant Against Contingent Fees. CONSULT ANT warrants that it has not employed or retained any company or person to solicit or secure this Agreement, and that it has not paid or agreed to pay any company or person any fee, commission, percentage, brokerage fee, gifts or any other consideration contingent upon or resulting from the making of this Agreement. In the event of a breach or violation of this warranty, the CITY shall have the right to annul this Agreement Professional Services Agreement- De Novo Planning Group Page 13 of16 34 189
Attachment 2
without liability or, in its discretion, to deduct from the compensation or consideration due CONSULTANT, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gifts or contingent fee.

4.18 Compliance with California Unemployment Insurance Code Section 1088.8. If CONSULT ANT is a Sole Proprietor, then prior to signing the Agreement, CONSULTANT shall provide to the CITY a completed and signed form W-9, Request for Taxpayer Identification Number and Certification. CONSUL TANT understands that pursuant to California Unemployment Insurance Code Section 1088.8, the CITY will report the information from Form W-9 to the State of California Unemployment Development Department, and that the information may be used for the purposes of establishing, modifying, or enforcing child support obligations, including collections, or reported to the Franchise Tax Board for tax enforcement purposes.

SECTION FIVE: MISCELLANEOUS PROVISIONS

5.1 Records and Audits. CONSULT ANT shall maintain complete and accurate records with respect to services pe1formed (including, but not limited to, the identity of the person doing the work, a description by date and person of the work performed, and the amount of time expended on such work) and costs incurred under this Agreement. CONSULT ANT shall also maintain its records suppo1ting its cost proposals used and relied on to enter into this Agreement.

CONSUL TANT shall maintain records to show actual time and allowable costs with respect to each task set forth in Appendix A of this Agreement." All such records shall be maintained on a generally accepted accounting basis and shall be clearly identifiable. CONSULTANT shall submit to the CITY such progress reports and final reports in the manner and time set forth in Appendix B attached hereto and by reference incorporated herein. The final repo1t and CONSULTANT's work product shall become the property of the CITY. All records required to be maintained hereunder shall be maintained by CONSULTANT for a period of five (5) years.

5.2 Access to Records. The CITY shall have access, upon reasonable notice, to the books and records of CONSUL TANT related to CONSULT ANT' s performance of this Agreement in the event any audit is required. CON SULT ANT shall allow inspection of all work data, documents, proceedings and activities related to the Agreement, and CONSUL TANT's performance hereunder, for a period of one (1) year from the date of final payment under this Agreement.

5.3 Ownership of Records. All drawings, original documents, methodological explanations, computer programs, designs and repo1ts and other materials prepared by CONSULT ANT in this performance of this Agreement (i) shall be the property of the CITY and shall be delivered at no cost to the CITY upon request of the CITY or upon the termination of this Agreement in accordance with accepted standards relating to public contracts, and (ii) are confidential and shall not be made available to any individual or entity without prior written approval of the CITY. Any additional copies will be the responsibility of the CITY.

5.4 Notices. Unless otherwise provided herein, any notices required to be given under the Agreement shall be in writing with copies as directed herein and shall be personally delivered, or delivered by United States mail, prepaid, certified, return receipt requested, or by reputable document delivery service that provides a receipt showing date and time of delivery. Notices personally delivered or delivered by a mail document delivery service shall be effective upon Professional Services Agreement- De Novo Planning Group 35

Page 14 of 16 ends

190
Attachment 2
receipt. Any notice given by mail shall be deemed to have been given when deposited in the United States mails certified and postage prepaid, addressed to the party to be served as follows:

To CITY: City of Laguna Beach
Attn: Dave Kiff, City Manager
505 Forest Avenue
Laguna Beach, CA 92651
Notices to CONSUL TANT shall be delivered to the address set fo1th below CONSULTANT's signature on Part l of this Agreement. Changes in the address to be used for receipt of notices shall be effected in accordance with this Section 4.4.

5.5 Severability. Each provision of this Agreement shall be severable from the whole. If any provision of this Agreement shall be found contrary to law, then the remainder of this Agreement shall continue in full force.

5.6 Authority. The person(s) executing this Agreement on behalf of the Parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound.

5.7 Construction and Amendment. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either paity by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. The headings of sections and paragraphs of this Agreement are for convenience or reference only, and shall not be construed to limit or extend the meaning of the terms, covenants and conditions of this Agreement. This Agreement may only be amended by the mutual consent of the Parties by an instrument in writing.

5.8 Extent of Agreement. This Agreement represents the entire integrated agreement between the CITY and CONSULT ANT and supersedes all prior negotiations, representations of agreements, either written or oral. This Agreement may not be modified or amended except by a writing signed by both the CITY and CONSULT ANT.

5.9 Special Provisions. Any additional or supplementary prov1s1ons or modifications or alterations of these General Provisions shall be set fo1th in Part Ill of this Agreement ("Special Provisions").

5.10 Precedence. In the event of any discrepancy between Part l ("Fundamental Terms") and Part II ("General Provisions"), Part II shall take precedence and prevail over Part I. Part III shall take precedence and prevail over Patt I and Part II.

5.11 Compliance with Laws. CONSUL TANT warrants and represents to CITY that it shall comply with all applicable statutes, standards, rules, and regulation required by Federal, State, and local agencies, including compliance with CAL/OSHA requirements as may be applicable.

Professional Services Agreement- De Novo Planning Group 36

Page 15 ends

191

APPENDIX A
"SCOPE OF SERVICES"
Professional Services Agreement- De Novo Planning Group 37 Attachment 2

Page 16 of 16 ends

192
Attachment 2

CITY OF LACUNA BEACH
Comprehensive Zoning Code Update
Submitted June 27, 2024
PREPARED FOR:

City of Laguna Beach
Kirsten Gallacher
Administrative Assistant
Community Development Department
kg allacher@l agunabeach city.net (949) 497-0723
De No v o Planning Group
A l, .tn d Us" Plann i ng, Des11n, .111d En\'rrQnm ~ nlal Firm 38 ••••
PREPARED BY:

De Novo Planning Group
180 E Main Street. Suite 108
Tustin CA 92780
In Association With:

JKA Architectu re+ Urban Desion I
Kittelson & Associates. Inc ~
193
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update

TABLE OF CONTENTS
I

COVER LETTER AND STATEMENT OF

INTEREST

CONSULTANT BUSINESS INFORMATION

EXPERIENCE/QUALIFICATIONS OF

CONSULTANT'S TEAM

APPROACH/METHODOLOGY

REFERENCES/PROJECT HISTORY

PROPOSED COST FILE

EXCEPTIONS

OTHER INFORMATION

APPENDIX A - RESUMES
De Novo Planning Group 39
1 3
5 9
19 25
26 27
A
i i
194
Attachment 2
De No v o Pl a nn ng Group
A La =1 d ll r. e P 1.- n n I n ~ n,. ~ i g 11 ., n d E n \' i 1 ,, 11 rn f- n 1 .1 I F i I m ••••

1. COVER LETTER AND STATEMENT OF

INTEREST
June 27. 2024
Kirsten Gallacher
Admini5trative Assistant
Community Development Department
[email protected] (949) 497-0723
Subject: Preparation of a Comprehensive Zoning Code Update Speaking on behalf of the entire De Novo l'/,v111i11g Team, we would like to thank you for the opportunity to mlnnit thv. proposal to prepare a comprehen;ive update to the City of Laguna Beac/;'s Development Code, including all task., specified in the RF!' and project management services. Based on our 1·eview ~f the RF!', deep local and regional experience, and long-range plam11ng expertise, we are confident that we l1atie assembled a first-class team to undertake thu cxc1rir1g project and deliver to the City a simpl(fied Zoning Code 011-sc/1ed11le and on-budget. Below we have outlined our dedicated team members and why r/;e De Novo team u best qualified to assist yoz, on thu important u-ork ~ffort.

Coming on the heels of other recent planning projects including the Housing Element Update Downtown Specifi c Plan Update and Streamlining Ord inance for projects subject to design review. now is an irnportant time to simply and streamline the City of Laguna Beach's Zoning CocJe to improve its long-term implemen· tal ion
OCH TE,\\I
We have ass(-,mbled a carefully-selected team of planning ancJ urban cJesign practitioners with deep personal ancJ professional experien ce in the region to work collaboratively with key stakeholders and the City of Laguna Beach on this project We are 100% committed to th ;s project ancJ will allocate our resources and energy in a way that will exceed all expectations. leaving the City with a simplified and effective Zoning Code that addresses c.irrent and future chal lenges and reflects c.omm,.m1ty va lues De Novo Planning Group would serve as the prime consultant for this contract with the City. Our team is lecJ by De Novo Principal Amanda T•opiano (who wi ll serve as the Princ1pal-1n -Charge). Starla Barker. AICP (who will act as a strategic advisor) and Ashley Brodk1n (who will serve as the Project Manager) Amanda.

Starla. and Ashley have managed numerous development code updates. and we have developed a highly successful approach to complex projects of this nature. We w ill remain personally involved in every aspect of the project from start to fini sh.

Our team also includes the following subject-area specialists JKA Architecture+ Urban Design (objective de· sign standards) and Kittelson & Associates, Inc. (transportation and parking). Thi s project team has worked together on numerous recent projects. including for the cities of San Jacinto. Lawndale and Palos Verdes Estates. to name ju st a few All of our team mem bers are ready to start work im mediately upon the City's notice to proceed and are committed to delivering the products on-tim e and on-budget.

De Novo Planning Group

DE NOVO PLANNING GROUP
180 E MAIN STRE ET. SUITE 108 I TU STIN CA 92780
ATROP [email protected] LANN ING COM I (71 4) 453 -7 711
195
Attachment 2
WHY DE .\O\'O
De Novo is a relatively small planni'lg firm in terms of staff size We know this. and we embrace it We consider our size to be a tremendous asset to our clients since it allows us to provide superior levels of customer service at very competitive billing rates I arger fim,s tend to carry cumbersorne over-head costs. which resu lts in the need for higher howly bil ling rates. frE:quent contract mod1ficat1ons and hii:,Jher staff turnover As an owner of the company. your Project Manager ;sable to make quick decisions to keep the project moving forward All of De Novo s principal-level planners prefer to roll up our sleeves and work on our projects ourselves.

As managers of the company, we take great pride in our work products and we strive to build a strong connection with each of our clients The greatest compliment that our clients pay us is to invite us back to provide adcl 1llonal services.

OU{ ST,\TE:\IE\'T OF ('0.\1\II'DIE.\T
We have structured this scope of work to best meet the Citys needs. as we understand them Howeve1. I wou ld like to emphasize that Wf: are m,.,rE; than har;py to work colla boratively with the City to refine this scope of work and approach to best meet the City·s needs and expectations for this very important project We are confident that De Novo s expertise ,n preparing irnplementable planning tcols across California cou pied with ouI subconsultant teams proven collaborative app,oach p resents the City with a unique opportunity to hire a team of consultants w ith the best possible com bination of ski lls needed for this project We look forward to the opportunity to further discuss ou, proposal and our approach to your project The offer contained in this proposal is valid for a minimum of 120 days. If you have any questions regarding this submittal please do not hesitate to contact me at (714j 453·7711 or at atropiano@denovoplanning com Sincerely,
Amanda Tropiano
Principal

D E NOVO PLANNING GROU P
180 E MAI N STR EET SUITE 108 I TUSTIN CA 92780
ATROPI AN O@D ENOV~ ~ LAN NING.COM I (714) 453 -7711
196
Attachment 2
Laguna Beach Comprehensive Zoning Code Update

2. CONSULTANT BUSINESS INFORMATION
De Novo Planning Group
A 111 rr d U se l'l11nr1ng Ue $lgn. ;ind t:5rv1rcnmtn 1., 1 I l r m •••• De Novo Planning Group Is a land use and environmental planning firm specializing in community planning. environmental studies design. and development services Founded in 2008 in the greater Sacramento area.

De Novo opened an office in Orange County in 20"17-led by Principal An,anda Tropiano-to serve southern California clients The fi1rn·::; principal -level staff have successfully completed over 400 projects consisting of ccrnprP.hP.nsive gereral plan:,. v1s10ning plans. sr1ec ik: plans. housing elements. environmental impact repoI ts negative declarations initial studies. NEPA analyses. climate action plans. biological assessments. wetland delineations and development projects throughout California As part of essentially all of ouI long· range planning projects De Novo designs and implements community engagement progI·ams

OUR MISSION
Our mission Is to provide municipal and private sectoI clients with world class p1ofessional services. through principal-level attention to every project Vl/e pride ourselves on our ability to work vvith clients to balance their economic social environmental. legal. and political goals Our services result: in an integrated planning and environmental solution for every project that is techn ically sound cost effective and delivered within the client's schedule

OUR PHILOSOPHY
Our philosophy is to proactively plan an(J design projects in such a way that public and environmental concerns are adcJ1essed and accommo· dated early in the process We strongly believe in the use of local knowledge for cJevelop :ng sensible and cost-effective solutions to local con - cerns Our solutions integrate local knowledge with the best available Iesources to achieve recognized national and international standards for planning a"ld environmental management to achieve a balance in local economic social and environmental goals De Novo Planning Croup is dedicated to fostering a partnership with each agency we serve through listening to th= comrnuntty and stakeholders and I efl ecting the ideas and concerns we hear in the approach developed for each project

OUR TEAM
The work program will be led out of ow so.Jthern California office located in the City of Tustin. De Novo is a Californ ia S-CorporatIon and has 20 ful ltime staff. including four Principals. three Principal Planners. four Senior Planners. and a team of technical associates. We provide personal service to all of our clients and are committed to exceeding your expectations on all components of the work plan.

De Novo Planning Group 42
De Novo Planning Group
180 E Main Street Ste 708
Tustin. CA 92780
Contact: Amanda Tropiano
714-453-771 l
[email protected]

DE NOVO SERVICE AREAS
Community Planning
General Plans
Visioning Plans
Housing Elements
Specific lllal'S
Zoning Codes
Public Facilitation
Grant Writing
Project Management
Application Processing
Project Review/Peer Review
Environmental Studies
CEQA Compliance
NEPA Compliance
Biological Studies
A91 icultural Studies
Air Quality Studies
Climate Action Plans
Sustainabil ity Planning
Mitigation Monitoring
Per 111itting
Design
Land Use Plans
Subdivision Layouts
Site Planning
Design Guidelines
Development
Feasibility Studies
Due Diligence Packages
Competition Analyses
Cost Estimate
3 197
JKA ARCHITECTS+ URBAN DESIGN
John Kaliski Architects. Inc (JKA). founded !n 2000 and based In Los Angeles California is a full service 11 per son. architecturE.- and urban design firm specializing in commurnty-based urban design anc! mixed-use and
multifamily :irchitecture ThE.- firm·s mission is 1·0 foste1 places and buildings that support health. happiness
and well being Over tV'/O oecades. JKA's urban dEsiqn
work has facilitated complex community planning chal ·
lenges. introduced innovative concepts building the
city design toolbox. and visualized community goals
and objectives in the form of standards and gu;delines
based upon observation. input and consensus building
As both urban designers and architects. JKA is well ..
versed In zoning codes. building codes. and construc -
:;on logics As architects the firm foct-ses on multifamily and 1nixed-use infill projects having completed over 500 dwelling units as well as single-family hospitality. and cummerc,al projects in the past five year,, JKA
brings this pragmatic experience to each of ,ts urban
design projects including urban design master plans.
cornn1unity-based spec ific plans development and
joint development feasibility studies. complete streets. active t'a11sportaiion/first mile/last rnile olanning projects transit-oriented design of statio1, areas and station stops visual simulations. and design guideline and standard projects.

In each J KA project. the key goal is to always foster
the creation of a durable authentic and sustainable
hurnan-scale experience that realizes a local sense of
community purpose
JKA Architecture + Urban Design
3780 Wilshire Boulevard Ste 500
Los Angeles. CA. 90010
Contact John Kaliski. FAiA. NCARB
213-383-7980
[email protected]
De Novo Planning Group 43
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update

I KITTELSON
& ASSOCIATES
KITTELSON & ASSOCIATES, INC.

Kittelson & Associates. Inc. provides comp1ehensive
transportation engineering. planning. and research
services to government agencies and private organizations. An Oregon Subchapter S Corporation found - ed in '1985. Kittelso n lv,s oveI· 350 staff in 25 officPs na tionwide. including four offices in California (Orange.

Oakland Sacramento. and San Francisco) Kittelson s
Southern California regional office. located in Orange. was established in 2014 and serves clients throughout
Los Angeles and Orange counties. With this breadth of
staffing. Kittelson ;s able to address client needs w ith local experience and national expertise.

Kittelson staff brins.J a demonstrated understand ing of transportation and circulation requirements. travel de
mand modeling. and regional knowledge developecl
over the course of more than 30 years of project expe·
rience in California. including through recent work on
general r.J lans ancJ specific plans in both Northern ancl Southern California. The firm provides support for all
stages of planning and environmental analysis. from
site analysis through approval and construction. Kittelson staff ar0 particularly knowledgeable about California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) compliance and recent changes to CEQA- required transportation analyses The
firm approaches each project by building a thorough
understanding of client and project needs and jurisdic
tion requ I1·ements. tailoring its work to assist clients in SL.cc.essfully fulfilling env·ronmental requirerr,ents in an efficient and c.ost-effect,vc- rnann,::1·
Kittelson & Associates, Inc.
750 The City Dr S Ste 410
Orange. CA 92868
Contact: Tim Erney
714-468-1181
[email protected]
4 198
Attachment 2
Laguna Beach· Comprehensive Zoning Code Update

3. EXPERIENCE/QUALIFICATIONS OF

CONSULTANT'S TEAM

AN EXPERIENCED PROJECT TEAM
The De Novo Planning Group team 1·epresents a fu ll-service team of city planning and subject-matter experts capable of providing §)l_service_:i requested by the City of Laguna Beach. We recognize and appreciate the trem endous commitn,ent you are making to th is prog ram :
; eie impacts to your time and financial resources are real and sigrnfic.ant and it is our goal to work with you on an eff1c.1ent program We will closely coordinate w ith C ty Staff and w ill provide principal-level attention to every step of the process while adhe1·ing to the pmject sched · ule and budget.

De Novo Planning Group has led Zoning Code Updates
for the following publ ic agencies (among others)
City of Brentwood
,, City of Lawndale
City of Lomita
>; City of San Jacinto
City of Sebaslopol
City of Westminste1
Glenn County
Colusa County

PROJECT CONTROLS
Our project team is fully committed to implementing
an E=ffecbve and efficient work program and bringing
the project forward with in a maximum of two years. We
thrive under deadlines. and we have a t1·ack record of
meeting or exceeding our project schedules Our use of
Principal-level staff throughout all stages of the project allows us to work quickly. efficiently. and produce preliminary draft documents of superior quality Our proj ect managers take a very active and hands-·on role. and we
diligently manage our team and coordinate w ith City
staff to ensure that all parties are continuously aware of pending deadlines. outstanding tasks. and draft w ork
products that will require staff review
De Novo Planning Grou p
We take tremendous pride in our ability to adhere to ou r project budgets. Our project managers are also principals and senior ma1~agers of the firrn. and to this encl we have the authority to take any steps necessa1·y to ensure that our projects remain on budgel. We manage our project· budgets using sophisticated budget t 1·acking software and ail members of the team log and record
hours-worked by task to provide a transpa rent accounting process Project Manager Ashley Brodkin will manage all monthly billing reports and will provide the City with a corresponding monthly status report idenLiry
work completed. upcoming work efforts. and outstand -
ing action items
\Ne strongly encourage the City to call eve1·y one of our references and spec ifically inquire about the extraordi na ry stf=PS we Lake Lo ensure we do not modify or ex·
ceed ou1· budgets.

PUBLIC INPUT PROCESS
With in-house community engagement expertise De
Novo is able to effectively and efficiently manage the entire woi-k program collaborate with public engagement specialists, and connect outreach efforts to actionable public policy work programs.

Our past experience preparing long-range policy cl ocu
ments has taught us that a key to a successful project is meaningful stakeholder and city leade1·ship involvement However. the process of working with a group of diverse interests can be challenging. it may be difficult to nc•ach consensus on all issues. and there may be challenges associated with generating public interest and involvement in the process
When a program doesn't go as-planned or produce the
expected results. the De Novo team seeks to identify the underlying challenge and address it head-on. Our work
program is intended to help the City achieve the level of engagement that must be present in this process 1n order to prepare meaningful policy documents. 44 5
199
Attachment 2
Laguna Beach· Comprehensive Zoning Code Update

TEAM ORGANIZATION
De Novo will be the prime and manage a team with deep experience planning and implementing development code updates Below is a chart outlining key management personnel For ease of reference. the following pages include brief biographies for key staff, and resumes for all team members are included in Appendix A Amanda Tropiano. a Principal and Owner at De Novo. will serve as the Principal-i n-Charge and Ashley Brodkin is a Senior Planner and will serve as Project Manager
Amanda Tropiano
Pri ncr pal-in-Charge
Perry Banner
Principal Planner
De Novo Planning Group

CITY OF LAGUNA BEACH
De Novo Planning Group
Starla Barker, AICP Ashley Brodkin
Strategic Advisor I Principal Planner· Project Manager I Senior- Planner Megan Thorne,AICP
Senior Planner + Designer
Subconsultant Team
John Kal1sk1, FAIA, NCARB
Managing Principal
Amee Bhatt. LEED AP ND
Senior Project Manager
45 Trm Erney, AICP, PTP. CTP
Senior Principal
Fernando Sotelo. PE, PTP
Principal Engineer
Michael Sahimi.AICP
Senior Planner·
Erik Anderson
Associate Planner
6 200
Amanda Tropiano
With deep professional planning experience in the region Amanda has successfully managed a wide varI·
ely of land use planning projects
all of which have included a robust
community engagement program
These projects include Genei-al Plan
Updates for Lake corest San Jacinto
San Marcos. Indian Wells Lawndale
and La Ve1ne and community p1oj
ects iri Irvine. Yorba Linda. Westminster. Rancho Santa Margarita. and Tustin. Amanda is certified by the In·
ternational Association of Public Par
ticipalion (IAP2)
Perry Banner
J <
Peri-y Banner brings a combined 20
years of experience in local government and private practice planning to the firm with work ir lx,th the
United States and Canada Perry possesses a diverse range of skills including project management. land use analysis. and policy development His
capabilities also include economic
development and real estate development Perry also supports private sector clients in navigating public
agency approval processes
De Novo Planning Group
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update
Starla Barker, AICP
Starla Barker. AICP. is a principal planner with De Novo Planning Group whose primary responsibilities are
the management and preparation
of environmental documents (Initial
Studies Negative Declaration. Environmental Impact Reports. and En· vironmental Assessments). as well
as other planning documents induc.Jinsi Cene1al Plans and Specific.

Plans. With over 77 years of professional planning experience Starla has successfully rnanaged a wide range
of projects with particular emphasis
in General Plans. urban 117fill downtown and redevelopment projects Megan Thorne, AICP
With over 15 years of professional
planning experience. Megan has
worked on a wide variety of planning
projects for public and private sector
dients. inclucing numerous specific
plans general plans corridor plans.
site plans. design guidelines. strate·
gic plans. sustainability programs. visioning projects. transit-oriented development plans. zoning documents. outreach programs. and 3D visualizations. Megan possesses the ability to think creatively and envision change
while keeping projects grounded
with achievable benchmarks and
implementable policy goals.
46 Ashley Brodkin
Ashley Brodkin is responsible fol thE:
preparation of environmental documents. as well as a wide \'a1·icty or planning projects including General
Plans. SpE:cific Plans. 01 dinance updates. and local CEQA guidelines Ashley has prepared and managed
a variety of CEQA and NEPA doc
uments for cap;lal improvements.
new developments. redevelopment
and urban infill warehouse/logistics
and public policy document projec.ls.
and a variety of planning projects
including General Plans Housing
Elen,ePts. Specific Plans Development Ordinance Updates. and entitlements Eri k Anderson
Er·ik has worked -on a diverse range of
projects for public and private sector
clients. with a focus on environmental and sustainability planning landuse planning. and policy develop· ment. Erik provides project support
in the preparation of CEQA documentation and long-range planning documents. includ ing General Plans.

Housing Elements. and Zoning updates. His experience includes grass roots lobbying with a non-profit environmental organization and work in the lccgal fielo.
7 201
John Kaliski
Since founding John Kalisk i Architects in 2000. John's work has in - cluded design guidelines fo1 th"' Hol -
lywood Boulevard District. a vision
plan for Los Angeles Crenshaw community. the Ocean Park Boulevard Complete Green Street. design of
affordable small lot subdivision town -
homes for Enterprise Foundation.
private homes. and over 1000 units
of multi family housing. His design
work and writings have been 1ecognizecJ with awards f,om the AIA and the American Planning Association
Tim Erney
Tim Erney is a Senior Principal Planner with over 20 years of experience managing analyses and documen
tation fo1 sustainable transportation
pi-actices. TDM measures pedestrian
and bicycle reviews. environmental
review p1ojects. access and circulation studies. parking evaluations. and data collection programs. Tim has
been leading the firm's efforts on the
evaluation of emerging technologies
and alternative evaluation metrics.

De Novo Planning Group
Attachment 2
Laguna Beach Comprehensive Zoning Code Update
Am ee Bhatt
' II
Amee Bhatt joined JKA in 2021 and
has seven years of expenence in arch1-
tectuIe urban design and plannmg
At JKA Amee manages all urban cJe
sign projects She conducts analysis
and creates goals. policies and actions
to enl1ance the evolving landscape
Amee has authored multi family and
mixed use objEcliv<c- clesign standards
that comply with S89 and maintain
the character of slllgle family neigh
borhoods. developed building proto
types and calculated opinions of cost
for economic feasibility studies
Fernando Sotelo
\
Michael Sahim i
\f
Fernando understands the complex Michael is an expe,ienced transpor1ties of transportation planning and tation planner with expertise in trafhas prepared transportation sections fie operations r~11vi1onmental analof Environmental Impact Reports for ysi5 travel demand modeling and major projects such as general plan forecasting. circulation studies and updates and specific plans. His pro- parking studies. He is also involved fess1onal c~xperience with traffic anc in active transportation and transit parking analyses includes schools planning. Michael works w ith Arcand a variety of land development GIS Cube. TransCAD Synchro and uses such as warehousing. mixed Tranplan transportation software His use. commercial and recreation proj· work has included coordination with ects in throughout California several agencies in Southern Cali47 fornia. including the San Bernardino
County Transportation Authority and
the OrangE County Transportation
Authority
8 202

4. APPROACH/

METHODOLOGY
Attachment 2
Laguna Beach· Comprehensive Zoning Code Update

HOUSING ELEMENT IMPLEMENTATION
A.mend Zoning Code to refer to state Density
Bonus
» Provide more flexible development standards for
affordable housing and facilitate development of
PROJECT APPROACH densities at or above 30 units per acre A comprehensive update to the Zoning Code that al
lows for a more usable and approachable code. simpli·
1 Ies r;roject review. implements the Housing Element
and conforms with recent State laws while preserving
Laguna Beach s unique character Include d iscussion
abou t working closely w ith public key stakeholders and planning staff
We have proposed to complete this work in 24 months
and will maintain strict adherence to the project sched · ule and budget. Below is a b1 ief summary of ou: appmach Lo this project ·

STREAMLINE AND SIMPLIFY THE

ZONING CODE
Simplify and clarify the development regulations
while protecting the City s unique aesthetics.
character. and charm
» Update Administrative procedures
Peduce amount of time it takes for a project to
go through Design Review
Narrow scope of items that require design
review
Emphasis on Chapter 25.05 (Administration )
Review Design Review Findings and
consol idate location of all findings in the Cocle
Add Definitions chapter
• Will include new uses as well as removing any
defunct uses
Include HE implementation
Comprehensive review to streamline and remove
and duplicate and contradictory language
Include tables for permitted uses and
development standards for residential and
commercial zone districts
Include images and graphics as needed to
illustrate concepts
De Novo Planning Group
» Amend R·3 zone to allow multi-family housing
restricted to extremely low to moc.ierate income
occupancy as a pem1itted use
lncentivize lot consolidations for sites that provide
100% affordable housing developments
Conformance with State law rnlated to low barrier
navigation centers. emergency and transitional
housing and pe1manent supportive housing
(SB2. SB745 and AB2162I. single-room occupancy
units and reasonable accommodations
., Accommodate larg0 group homes as a residential
use and establish cond itions of approval thal are
objectives and provide for certainty in outcomes

OBJECTIVE DESIGN STANDARDS
Review I ecent projects to identify potential issues
related to objectivity
,, Conduct mult·1ple site tours to memorialize the
essence of the Laguna Beach typology
,, Review objective design standards for similar
agencies to identify best practices
Create legally-defensible standards that 1eflect
the history and character if Laguna Beach

MODERNIZE THE ZONING CODE,

ADDRESS LEGAL REQUIREMENTS, AND

INCORPORATE BEST PRACTICES
To ensure that the Zoning Code best serves the City·s
current and future needs. De Novo will update the Code
to eliminate outdated processes and provisions. refler;t al! legal requirements. and address contemporary top·
ics.
48 Evaluate parking standards
Make amendments to follow industry best
practices by more accurately captLll"ing parking
demand based on land-use
9 203
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update

SCOPE OF WORK
We have prepared the following Work Plan in response
to the City's Request for Proposals. our understanding
of local concerns. and our experience working on zoning code projects throughout California While we believe
this scope of work addresses the City's needs. should
~'l"= City have any requests or modifications. we would be happy to tailor the scope accordingly. All work prod ucts will be delivered in an electronic format. whe1·e hard co:J ies of r,1oducts are provided. they a1<?. spr:::cif1cally identifiE:·d in the a;,suc.iated ta,,k deliverable Beluw is a summary of our proposed scope of work
PHASE 1 - PROJECT INITIATION
The first phase of ow work plan is foe 1ised on establishing relationships with City staff who will play a key role in the project. becoming familiar with Laguna Beach's
existing conditions. anu initiating the project management protocols that will ensure a successful planning process
Task 1.3: Project Management
Project management activities will include coordination between the De Novo management team and City staff. and will involve bi-weekly team conference calls. and monthly progress reports. includ ing the status of
each task and deliverables
Deliverables: Monthly progress reports, and
other written correspondence as required.

PHASE 2 - PUBLIC PARTICIPATION
This task will include public workshops and study sessions in 01der to collect feedback from residents. business owners. community members. and other stake holders throughout the Comprehensive Zoning Code
Update process It is also during this task prior to the complehon of the draft zoning code update that residents. property owners developers and the business community will have the opportunity to submit input
Our approach to the task provides for additional oppo1·· tunities for community involvement in order to ensure
thar: the Zonin\;J Cod0 Update c.on,,1ders and r<?.flects th0 Task 1.1: Kick-Off Meeting community s priorities and provides a variety of means The De Novo team will m eet in person with City staff to of community input kick off the project. We anticipate discussing the following at the kick-off meeting:

Project management and communication
protocols.
" Confirm/finalize projr:'c.t ,,co1"Je of work and
schedule.

Discuss public outreach approach. and
Review data request for key background
documents.

Deliverables: Kick-off meeting agenda, data
needs list, sum mary notes, inventory of
relevant documents.

Task 1.2: Timelines and Milestones
De Novo will prepare a date specific schedule with milestones for the project. The project schedule wi ll identify work product review deadlines and both minor and major milestones Included with the schedu le will be an action plan that includes details of each phase of the project and ic.ient1fes important milestones tor thEi project Deliverables: Draft and final date specific
schedule and project action plan.

De Novo Planning Group
Task 2.1: Public Participation Plan
Following the project kick-off meeting. the team will
meet rn -person t0 review. confirm and/or rncdify the
proposed public participation work plan to ensure that
is best meets the needs of Lhe City and the communi ..
ty. particularly in light of any new ideas or infoi-mation discovered during the proposal process. Our proposed
approach provides multiple avenues for involvement to
ensure Lhal the community and stakeholders have ad -
equate opportunities to participate in the process Fol
lowing our meeting we will prepare a Public Participation Plan to use as a guide throughout the project.

The Public Participation Plan will include elements necessary for the consultant team and City staff to create pathways for active public engagement. It will incor·
porate goals for participation from all segments of the community. stakeholder analysis. a communications
plans. programs and activities roles and responsibilities. and a calendar.
49 l 0
204
Attachment 2
Laguna Beach· Comprehensive Zoning Code Update
As part of this task we will prepare a project logo and colot· scheme We wi ll work with the City to ensure that the project b1·and is distinct. while representative of the City's overall style and tone The results of the branding exercise will be documented in a branding design sheet
Deliverables: Public Participation Plan, project
logo, document template, and branding design
sheet.

Task 2.4: Community Workshops and PopUps
Our team will host up to ore pop-up event and five
community workshops The pop-up event will be timed
to occur concurrent with an ongoing community event.
in an effort to maximize pa1·ticipation Material ptepareo fot the pop-up event will also be transferable to City
staff should staff decide to host additional events beyond the one included in this work program While the Task 2.2: Project Webpage Content exact timing and content fo, the workshops wi ll be de De Novo will develop co.-.tent for inclusion on the City's termined in coordination with City staff we expect that website (unde: a dedicated project page) The City-man the first work5h,Jp will be held toward~, the beginning (Jf aged webpage will serve as a central location fo1 p1oj- the work program ect upd<1tes and information links to surveys as well as Deliverables: Facilitation of one pop-up event an avonue to adve1·tise upcoming wmkshops and open and five community workshops, outreach houses materials, and summary of outreach
Deliverables: Project webpage content
Task 2.3: Educational Materials
In coordination with City staff ou: team will identify
educational materials and digital engagement tools to
share information al)out the Zoning Code Update and
how com munity members can pa1tici pate We will work
with City staff to share all educational and engagement materials. along with project updates. via the Cit y'5 wE:b site existing commurncalion ancJ stakeholder networks
ano social media outlets The tearn will dc~velop a flir,r for each workshop open house. email blasts. website
content ancJ a social media plan with sample social me· dia blurbs for the project Our team w•II wmk w ,th City staff to develop shorthand project updates and educa
tional content in the form of NextDoor posts. Facebook
posts. and website updates.

Deliverables: Regular content development
and delivery throughout the project
De Novo Planning Group
Task 2.5: Planning Staff Round Table
De Novo will faci litate an in person 1ound table discus· s1on w ith all of the City's Planning staff to hear from them the1t experience with using the City's Zoning Code. ancJ to get an understand ing of their ideas and concerns for the comprehensive update to the Zoning Code. inc lud
ing suggestions for project submittal.

Deliverables: Facilitation of round table,
agenda and summary of discussion
Task 2.6: Stakeholder Interviews
De Novo will meet with key stakeholders early in the
process to heat from them. gaining an under5tanding
of their interests. concerns and ideas . Interviews w ith incl1viduals or small group meetings allow stakeholders to speak candidly about the projec t The interviews 1n· volve up to tour (L,.) half-hour to one-hour confidential meetings (held via video/teleconference) over two days
De Novo will collaborate with City staff to identify stakeholders. Potential stakeholders wi ll incl ude membe1·s of the local development and business community
including developers architects. landscape architects
planners Realtors the Chamber of Commerce and organizations representing different interests in the City 50 ,, Deliverables: Facilitation of four stakeholder
interviews, summary of interviews
11 205
Task 2.7: Study Sessions and Hearings
Throughout the process it will be necessary to provide
information and receive feedback from the Design Re·
view Board. Planning Commission. and City Council on
a number of topics. We recommend hosting study sessions with each body during their regularly scheduled meetings to discuss these topics or if preferred can
conduct joint sessions for City Council and Planning
Commission. we well as City Council and Design Review
Board
Ir addition to the study sessions and public hearings un· cler th is task. De Novo will be available for check-ins with the City Council as nr~eded.
» Deliverables: Facilitation of six (6) study
sessions and public hearings with City Council,
Planning Commission and/or Design Review
Board
Task 2.8: Public Participation Summary
The public participation process will result in a comprehensive Public Participation Summary that will sum mar·ize the community engagement program. input
received. and outreach outcomes It will also identify the community's goals and concerns for the project. as well as sp<='cific issue areas that n,ust be addressed in the Zon ing Code Upciate
Deliverables: Public Participation Summary
Memorandum
PHASE 3 - ASSESSMENT
Task 3.1: Zoning Code Issues Summary
De Novo will prepare a Zoning Code Issues Summary
Report to serve as a broad roadmap to guide the Zoning
Code Update ft.s part of this wor-k. we will review thE:e following documents plans. procedures. and p rograms.

Deliverables: Zoning Code Issues Summary
De Novo Planning Group
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update
Title 25 of the Laguna Beach Municipal Code (Zoning
Code) Assessment
The existing Zoning Code will be reviewed to identi·
fy which chapters should be retained . eliminated o r
revised. This r·eview will also identify opportunities to streamline presE:entation of information such as consolidating allowed uses by district into a single table for each class of disti-icts, consolidating development standards and regulations into tables, arid summarizing permit and approval requiren,ents for each type of permit In addition to the existing Zoning Code. De Novo will re view the analysis of Zoning Code chapters completed by
Planning staff. as well as 1·ecently approved docun,ents. the 2021 2029 Housing Element. and draft plans
De Novo will prepare a summaI y report of issues and
concerns that should be addressed This includes reviewing:

Opportunities to streamline the Zoning Code
Consistency with all applicable laws and
regulations.
;, Modern and emerging issues that _arE:e not
address.
~1emoval of inconsistEnc1es and conflicts.
,, Suggestions for improvE:ements to approval
procedures.
» Potential gaps in guidance. and
Otlwr concerns ich:ntified from Phase 2 and 3 of
the project
Development Review Process
De Novo will review the City"s submittal requirements. a samplE:e of complex staff re pot ts. existing findings. in order to become familiar with the implementation of the Zoning Code and review and approval process The ex -
isting Zoning Code. with an emphasis on Chapter 25.05
Administration. w ill be reviewed to identify potential fm revisions that will result in intuitive and streamlined development review processes. including potentially allowing more types of pmjects to be exempt from design review rather than require administrative design review. and allowing more projects to be subject to administrative design review rather than discretionary rev,ew by the Design Review Board. This will include a review of
the existing findings in the Code for the various permit processes.
51 12
206
General Plan and Local Coastal Program Consistency
De Novo will review and evaluate the General Plan to
ensure that the Zoning Code update is consistent with
all elements of the General Plan. including the recently adopted 2027-2029 Housing Element Additionally the
ream will review rhe certified Implementation Plan of
the Local Coasta l Program (LCP) for con istency with the Zoni'lg Code update and to make recommendations
on potential strategies for simplifying and streamlining the LCD De Novo will include the summary of any in
consistencies and recommended amendment5 in the
Zon ing Code Issues Summary
Zoning Code Best Practices
The ex isting Zoning Code Update will be reviewed and
areas w II bE identified that c::an rx, improved with mc,r~" effec tive procedures. It is anticipated that these will in - cluoe the use of graphics for clarity purposes. Additionally. the team will evaluate best practices from a sampling of other jurisdictions to identify Zoning Code best p1ac t;ces. De N0V(J will ir·,c::lude th1c sun-imary of the find - ings 1n the Zoning Code Issue$ Summary
Specific Plan and Guidelines
De Novo will review and evaluate the Zoning Code
specifically for refer(,nces to Specific Plans and Gwde lines and make recommendations if any changes are
required as part of the comprehensive update to the
Zoning Code. De Novo will include the summary of the
'indings in the Zoning Code Issues Sun°mary
De Novo Planning Group
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update
Parking Standards
Kittelson will conduce an evaluati n of the City·s existing parking standards and make recommendations that follow industry best practices. De Novo will include the summary of the findings in the Zoning Code Issues
Summary (Task 3 l )
State Laws, Court Cases and Relevant Legislation
The existing Zoning Code will be revieweo to identify ar eas that are no longer in conformance with State lcgis
lation. rec<::nt court vases. and/or 1elevar0 t litigation with the goal of ensur-irg that all sections of the code that re quire updating due to these concerns are brought current. De Novo will include the summary of recent State laws related to zoning and relevant litigation and identifying a1~p1opr'&te modifications to the Zoning Code to ensure consistency with State law court dec isions. and othe1 relevant legal considerations in the Zoning Code
Issues Summary (Task 3 l)
Task 3.2: Zoning Code Update Outline
Based on input received 1n Phases 2 and 3 De Novo
will prepare a draft annotated working oulline that ad-- dresses the proposed organization of the Code and how
State requirements and City pr·iorities will be addressed in the update. We anticipate a virtual meeting to review the working outline and to discuss any desired changes and (Jit",,ction for the preparation of the draft Zoning CcJde chapters and sections De Novo will preparf: a final working outline that will serve as a broad roadmap to
guide the Comprehensive Zoning Code Update effort
52 Deliverables: Draft and Final Zoning Code
Update Outline
,/
13 207
PHASE 4: DRAFT ZONING CODE UPDATE
The De Novo team will prepare a comprehen sive update to the City·s Zoning Code based on input from City staff: updates required by the California Govern·
ment Code. Cal1forrn a Build!i,g Code. State and federal laws. and case law Housing Program5 in the 2021-2029
Housing Element: input from the City Council. Planning
Commission and Design Review Board, and public and
stakeholder input The r·esulting product will be a Zoning Code that implements the General Plan. reflE:cts local issue5. is well-organized and provides clear ane1 understandable gu,dance to City residents staff. ancl
e.:lectF,d and appointed officials
Task 4.1: Administrative Draft Zoning Code
De Novo will prepare a con1prehensive Administrative
:)raft Zoning Cod,;, Update that reflects the input and direction provided in Phases 1 through 3 as well as best practices and legal requirement is internally consis
tent and user friendly and illustrates key requ1rr~ments.

Based on our experience preparing and working with
Zoning Co(Jes. we have presented a general outline
below for your consideration. De Novo wi ll support any preferences the City has in terms of consolidating sec - tions. or developing and providing information in sep·
ar·ate chapters. the information provided here is for reference only. anc.J we expect the final organization and content to reflE:c: the information we hear from staff
and the community.

Introduction
The introduction to the Zoning Code will address the
purpose. applicability, and interpretation of the ord 1- nance
Administrative Provisions
Administrat ive p rocedures. develo;)mE:nt appl ication fil· ing and processing procedures. and an overview of zoning district established by the Code Tables will be used to summari ze decision-making and appeal authorities
for zoning decisions. public notice and hearing require· ments and similarly complex topics. De Novo will review the requirements for each permit and approval type to
ensure that public notice and hearings are consistent
with the requirements of State law. We will review the
Zoning Code for opportunities for new types of approv-- als/perm it s or signi ficant revisions to existing processes De Novo Planni ng Grou p
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update
Definitions
Definitions will be provid ed fo1 all special ized terms in the Zoning Code. Definitions wil l be updat<':d to correspond to the updated listings of uses prepared for each zoning d istrict. The definitions will be reviewed to en· sure that they arE appropriate Where appropriate. definitions will refer to State law and regulations.

Zoning Districts, Allowable Uses, and Development
Standards Provisions
The De Novo team wi ll prepare the chapters of the Zoning Code containing regulations applicable in spec.ific. zones ancJ overlay zones prepared for the Zoning Code
At a m inimum. these provisions will address the following 53 /:>, land use classifica c on <:,ystE•rn that clearly idE:ntifles the usE:s that rnay be allowed in each
zoning distric.t. The classifications system w ill
utilize current planning terminology. and an
appropriate combination of spE:cific and generic
land use types. rather than a lengthy list of
allowed uses that can quickly become obsolete.
,, .<\llowable uses by zoning district (table will
include an appropriate combination of specific.
and gener·ic use types rather than a lengthy I isl
of uses that can quickly become obsolete) and
type of arproval required for each use presented
in a table. Uses (currently allowed uses as well as
proposed new uses) will be reviewed in Phases
2 and 3 to identify where it is appropriate to shift
the approva l to an administrative review.
;, Development standards and regulations for
each distric t will be presented in table format
that summarizes standards for each class of
uses (i.e .. residential commercial. etc) to simolify
the comparison of standards and regulations
between districts. Development standards will
be reviewed to ensure that factors such as height
limitations. setback requirements, site coverage
requirements. etc. are appropriate for each
district and modern practices
The zones. t he land uses allowed within them,
and the type of ministerial or discretionary land
use approval s required fo r each use.
14 208
Attachment 2
Laguna Beach· Comprehensive Zoning Code Update
General Development and Site Planning Provisions Task 4.4: Public Review Draft Zoning Code Regulations that apply to multiple zones At a mini- Following the completion of Task 4.1. the team will premum. these provisions will address the following· pare a 5creencheck draft Zoning Code that addresses ,, Landscap ing standards;
Parking and loading standards;
Lighting standards.

Density boi'us provisions: and
Sign regulations
Special Provisions
Special use provIsIons will be 1d<-:'nt1f1ed ;md s:andards will be developed These will include special uses ad·
d1·essed by the County5 cun-ent Zoning Code a5 well a5
any additional uses identified duIing the Gene1al Plan
and Zoning Update process
Deliverables: Administrative Draft Zoning Code
Task 4.2: Administrative Draft General Plan
Amendment
In conjunction with the Comprehensive Zoning Code
Update. De Novo wil l complete a General Plan Amend
menl to create consistency with the update Zoning
Code The team wi ll prepme a focused amendment to
the General Plan in administrative oraft format. to be
used for internal staff review
Deliverables: Administrative Draft General Plan
Amendment
Task 4.3: Administrative Draft Local Coastal
Program Amendment
In conjunction with the Comprehe'ls•ve Zoning Code
Update. De Novo will complete a Local Coastal Plan
Amendment to create consistency with the update
Zo111ng Code The team will prepare a focused amendment to the Local Coastal Program ,n acJm,nistrat've draft format. to be us8d for internal staff review.

Deliverables: Administrative Draft Local
Coastal Program Amendment
De Novo Planning Group
the comments received from City staff Following City
staff approval of the screencheck draft. the team will
prepare a draft Zoning Code for public review The Public Review Draft Zoning Code wll be provided to the City for distribution to the public and appropriate agencies and posing on the City·s and projects website De Novo
will be available to present the Draft Zoning Code in a public workshop and/or Planning Commission and City
Council meetings to provide the decision make,s ano
community with information regarding the intent and
structure of lhe draft documents and to rl'3ceIve comments on the draft documents Deliverables: Screencheck and public review
draft Zoning Code
Task 4.5: Public Review Draft General Plan
Amendment
Following the completion of Task 4.2 the team will prepare a screencheck draft General Plan Amendment that addresses the comments received from City staff Fol·
lowing City staff approval of the scrcrmcheck draft. the team will prepare a di aft General Plan Amendment for
publ ic review
Deliverables: Screencheck and public review
draft General Plan Amendment
Task 4.6: Public Review Draft Local Coastal
Program Amendment
Following the completion of Task 4.3. the team will pre pare a screencheck draft Local Coastal Program Amend
ment that addresses the comments received from City
staff Followmg City staff approval of the screenchecl<
draft the team will prepare a draft Local Coastal Pro
gram Amendment for public review
54 Deliverables: Screencheck and public review
draft Local Coastal Program Amendment
15 209
PHASE 5: OBJECTIVE DEVELOPMENT

STANDARDS
Task 5.1: ODS Kickoff and Context
Evaluation
JKA will lead development of the Objective Development Standards. t,._s part of this work. the team will host a kickoff meeting specific. to objective developm&nt
standards. which should inc lude representatives from
Community Developmenl and the Cty Attorneys Office
Jl<A will also conduct a thorough evaluation of existing conditions and best pr·actices lo establish a foundation for the creation of objective design standards unique to Laguna Beach. This will include a review of existing documents. review of recent projects. fie ld observations a review of other objective design standards 13 case studies) and preparat ion of an existing character analysis and recommendation report and presentation
Deliverables: Kickoff meeting; Existing
Character Analysis and Recommendations
Report and Presentation
Task 5.2: Objective Design Standards
JKA will prepare a set of administralive draft Objective Design Standards for multifamily and mixed-use projects This will include design. mass and scale. The ad - minist1 ative d1 aft will be presentc~cl to Staff for review and comment We assume we will receive one set of
consolidated comments. Based on comments on the
administralive draft. the team will prepar<= a Public Review Dr aft for public comment Comments on the Pub lie Review Draft will be summarized and presented to
the Planning Commission and City Council for considerat ion. ,, Deliverables: Administrative Draft and Public
Review Draft Objective Design Standards for
multifamily and mixed-use projects
De Novo Planning Group
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update
PHASE 6: PUBLIC HEARINGS & ADOPTION
Task 6.1: Public Hearings
At the conclusion of the project. it will be necessary to present the updated Zoning Code Update. General Plan
Alllendments. Local Coastal Program Amendments.

Objective Design Standards. to the Design Review Board.

Planning Commission and City Council for their respect ive review and approval during a public hearing We expect to hold up to three public hearings between the D<=sign Review Board. Planr0 ing Commission and City
Cou:icii. De Novo will prepare the staff repo1 t for public hearings A member of the De Novo tean, will attend
the hearings and be~ prepared to field qui,stions on the project.
,, Deliverables: Facilitation of three (3) public
hearings with City Council, Planning
Commission and/or Design Review Board.

Task 6.2: Final Zoning Code
Following the City Council's final h<::anng on thE: r->rOJect.

De Novo will prepare the final Zun1ng Code that reflects the direction of the City Council The Anal docuin<=nt is lo be provided to the City in both a PDF and Microsoft
Word format.

Deliverables: Final Zoning Code in PDF and
Microsoft Word
Task 6 3: Final General Plan Amendment
Following the City Council's final hearing on the proJ - ect. De Nov0 wil l prepa1e the final Gr;-nPral Plan Arr1end - ment that n,·fler:ts the direction of the City Co,.mcil ThEAnal ooc.urnent 1:, to b& provided to the Cty in both a PDF and Microsoft Word forlllat
55 Deliverables: Final General Plan Amendment in
PDF and Microsoft Word
16 210
Task 6.4: Final Local Coastal Program
Amendment
"'ollowing the City Council's final hearing on the project. :::>8 Novo will prepare the fina l Local Coastal Program /.i..mendment that reflects the direction of the Crty Coun cil. The final documerrc is to be provided to the Crty in both a PDF and Microsoft Word format.
,. Deliverables: Final Zoning Code in PDF and
Microsoft Word
Task 6.5: Final Objective Design Standards
:=ollowing the City Council·s final hearing on the project. ]KA will prepare the final Obje<;tive Design Standards
:hat refects thEo- dirEo-ction of the City Council. The final aocument is to be provided to the City in both a PDF
anc.l Microsoft Word format.

The E:ffort to finalize the Objective Desrgn Standards also inc ludes staff training (one seminar) and three design re· view assists. This effort will help to ensure that Staff is ful· ly prepared to consistently apply the objective standards going forward
Deliverables: Final ODS in PDF and Microsoft
Word; one training seminar; three design
assists
Task 6.6: Implementation
De Novo will prepare list of implementation measures
that· require follow-up for the project The implementation list will identify how each implementation item will be implemented including the City department respon ·
sible for implementation. as well as the timing of imple· men tat ion. The De Novo team will work closely with City staff to prepare this list Additionally. De Novo will devel op tI ain ing materials to assist staff in educating both cur· rent and new employees on understanding the updates
to the Zoning Code The matf=rials will be a tool for City staff ano decision-makers on how to navigate the new
Zoning Code·s organization. processes. and standards
Deliverables: Implementation list and training
materials.

PHASE 7: ENVIRONMENTAL REVIEW
Based on our understanding of t he project that is an update to existing regulato1·y documents to comply with new laws and reinforce existing policy direction. and
De Novo Planning Group
Attachment 2
Laguna Beach. Comprehensive Zoning Code Update
not anticipated to result in any direct or indirect physical changes to the environment. we anticipate the project will be covered by the common sense exemption pursuant to CEQA Guidelines Section 1506l(b)(3). which
states that CEQA applies only to projects which have the potential for causing a significant effect on the environment De Novo will prepare the Notice of Exemption to support the approval. Pursuant to CEQA Guidelines Section 15062 the Notice of Exemption will include a brief pr(;ject description. findirg that the project is exempl from CEQA. and a brief statement of reasons to support
the finding. If during the work prograrn it· is oetern,inecJ the CEQA Exemption may not be appropriate. further
discussions with the City will occur to determine the ap· propriate approach to the environmental review to pro·
vicJe a legally defensible CEQA document
Task 7.1: Notice of Exemption
De Novo wi ll prepare and file a Notice o' Exernptror, for the project with the County Clerk and State Clearing·
house
,, Deliverables: Draft and final Notice of
Exemption
OPTIONAL Task 7.2: Initial Study/ND or MND
Based on direction provided by the City. De Novo Plan·
ning Group could prepare an Initial Study and Negative
Declaration or Mitigated Negative Declaration in place
of the proposed Notice of Exemption (detailed in Task
71) Based on existing project details. no technical stud· ies are anticipated as part of this task
Deliverables: Draft and final Initial Study and
Negative Declaration or Mitigated Negative
Declaration
OPTIONAL Task 7.3: Addendum
Based on direction provided by the City De Novo Plan11ing Group could prepar·e an Addnedum to the Current General Plan Final EIR in place of the proposed Notice of Exemp tion (deta iled in Task 71) Based on existing project details. no technical studies are anticipated as part of this task
Deliverables: Draft and final Addendum
56 17
211
Attachment 2
~ f-f--l--l--l-+-+-++-'--+-+-+-l-l- f-!--1--1-+-+-+-+--+--+-+-+-l-l-'f-f--l-+-+-+---l t
[ f--
i .i
f-+--+-+-+--++-----f-+-!--+-+---j cq ~ l-+--+-t---l-11-+---+-+--+-t--+-l-+-+-+--+-1--+-l-+- I-I ~
-+--l--l--l-li---+--+--+-+-l-----l-l---1--1--1-1-+--l--l-+-l-----l-l---l---l f f--+--+--+-+-1-----1-1----l i 1-+--1-1--1---ll-+--l--i--l-+-l-----l-l--+-+-. -l---l---ll---+-+--+--l-+-+-l---+-l----l l--l-+-+-+-++--+---l----J.-l-lf-f--l-1--+---1,! 1--++-+--+-+-+-l-l-f-l--l-+-+---l- -l--+--I ~
j
~ i
;,
r
,1
,,
~
I f---J--1--l-l--l---+--+--+----l----l----l--+---11J lf-1--1----l--l--l-l--l---+--+--+--+---1-----1----l--+--+---l--+---l ~
212
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update

5. REFERENCES/PROJECT HISTORY
Please contact our I eforences to he:ir first-hand our cornmItment to c.,ur clients and thei• bud:;iet£ and schedules. For each project we pu1·su,'.. we carefully evaluate our staffing resources and availability to ensurE: that our tearn can be fully dedicated to the work effort We completEd this level of review ane: analysis for these projects and are confident chat our existing staff have sufficient time to dedicate to the City of Lomita. Project profiles for the referenc.Es listed below and other relevant projects are provided on the fol lowing pages De Novo Planning Group
..,.,,, _______ .. _..,_,__
--.. ---·- ----
__.....,,_
----·- ___ .,. __ .. ,...._ --~-·-" ... _
City of San Jacinto
General Plan Update. Housing Element Development Code EIR Travis Randal. Assistant City Manager
951 654 7337 x 400 I trandel@san1acintoca gov
595 S San Jacinto Ave. San Jacinto. CA 92583
City of Westminster
General Plan Update and EIR Housing Elem ent. Rezoning Program Alice Tieu . Associate Pl anner
714-548-3485 I atieu@westm inster-ca.gov
8200 Westminster Bl vd .. Westminster CA 92683
City of Fontana
Downtown Development Guidebook
Patty Nevins. Director of Planning
909-350-7625 I [email protected]
8353 Sierra Avenue. Fontana CA 92335
58 1 9
213
Attachment 2
Laguna Beach: Comprehensive Zoning Code Update
'

OUR COMMITMENT TO IMPLEMENTATION
\/\/hen preparing development code updates. our entire team carefully considers how the project can be implemented by the local agency post·adoption. OUJ team brings to the table experience working as City staff which gives us special insight into how development codes are implemented on a day-to·day basis. Additionally. our team has prepared g~neral plans. specific plans. and environmental documents for private projects allowing us to see •irst-hand how the dew,lupment industry interprets and responds to zoning direction To highlight the succe,s of our approach th1ee projects and an example of their implementation a1·e provided below.

S.\'.'i J,\<:l'.'iTO DE\'EI.OPME\T ( 'ODE l 'PU.\TE
Project Considerations
Stakeholder en9agement
Community support
ldent1f1cat1on of development
o ppo rtu nit ies
,, Analys1s of market trends
Role of technology in plarning
Target areas for focused City
attention and funding
,, Future project streamlining
Project Considerations
Mobile home owner concerns
New mixed-use designations
,. Density and in tensity
Placemaking/identity
Trili ngual outreach
" Unincorporated county islands
Traffic: mitigation mE,asu res
Implementation plan
Implementation
Followin9 the City's Com pre·
hensive Zoning Code Update
the City has leveraged permit
streamlining programs to at
tract signifcant new commE-r·
cial investment. including new
shopping and di111ng options
and jobs centers
\\'ES'l':\11\STEH ZO\I\(, < om: l 'l'l),\TE
Implementation
Approved in June 2078. the
Bolsa Row project will bring a
dynamic. mixed use complex
Lo Little Saigon implementing
the City's new MU Little Saigon
General Plan lano use designa·
tion. The project includes: 200
apartments a hotel a ban·
quet facility and about 45 000
square feet of retail
FO\T.\\.\ UO\\'\TOW\ l>E\ l·:l.(>l'\IE\T Gl IUEBOOh:

Project Considerations
Support for increased density
,, Placemaking
Streetscape improvements
Preservation of sales tax dollars
Multimodal transportation
, Streamlined project approval
Ana lysis of best practices
Implementation
The Fontana Development
Guidebook has spurred the City
to re·imagine Sierra Avenue. the
main thoroughrare of Downtown
Fontana The City has initiated
plans to remove two travel lanes
and improve the pede5trian
experience: eventually Sierra Avenue will be ful ly closed to create a vibran t pedestrian zone
De Novo Planning Group 59 2 0
214
Attachment 2
Laguna Beach. Comprehensive Zoning Code Update

SAN JACINTO GENERAL PLAN UPDATE, ZONING CODE UPDATE, AND EIR City of San Jacinto
De Novo Planning Group lead a gmup of consultants to work with the City of San Jacinto to prepare a compre· hensive update to the City's General Plan. Zoning Code. and the corresponding EIR as well as a Cultural Landscape Study integrating innovative engagement techniques and creative communication methods are key to this important project in San Jacinto Like the 1·est of the Inland Empi1 e. the City of San Jacinto is expe1 ienc1ng changes Lo who lives. works. and visits the commun ity Its r·esidents are more diverse than ever: its population is getting older. but relatively afforcJable h0n1e pricE:s and nr:,w develop1nent 1n the DowntCJwn (spurred by the torthcon-,1nq Downtown Specific Plan) will attract new residents to this charming community People who call San Jae nto home celebrate the City's history and culture and are proud of its special place in the Inland Empire Building off the excitement of Envision San Jacinto's Go Human event. the City's General Plan Update and Zoni'lg Code Update cont nued to engage a wide range of community members and key stakeholders through traditional in-person ancl online outreach 5trategies As part of our elevated work program De Novo prepared a brief 3-minute video celebrating the history of San Jacinto and describing how the City is preparing fo1 its future by updating its Genf:1 al Plan. The team is also rneeting with key stakeholders in a sE'11'ies of focus groups to discuss impOl'tant issues 111 San Jacinto. including housing opportunities economic development. cultural and historic resources and farmworker issues !<.earns & West prepared and released a bilingual direct mailer to every acld1·ess 1n San Jacinto. this represented the filst time the method was useo in San Jacinto. and 1esultecJ in the highest levels of en9agE>rnent the City had ev1::r experienced.

Based on information gathered from the community the team was able to assemble a new land use plan. zoning map. designations. and zoning districts that expands the range of housing and business development opportunities thmughout the City This involved a process of direct prope1'ty owner engagement as well as review by the Planning Commission and Crty Council De Novo implemented the General Plan through an update to the Zoning Code includ· ing Housing Element Implementation
Date Range: 2018-Ongoing
Key Considerations
,, Economic development
r, Climate planning
• Downtown revitalization
" Multilingual engagement
» Use of technology
~ Implementation actions
)) Financing strategy
De Novo Planning Group
WHAT \NE HEARD
• fa ........
• ""'°""""' • H•wt0Mt
• Oirac.tWalN,
bo'-'•r ..
l 130
p60
t>~cd. wltt,
~
f 15,000+
...........
2 1
215
Attachment 2
Laguna Beach. Comprehensive Zoning Code Update

GENERAL PLAN, EIR, ZONING CODE UPDATE, HOUSING ELEMENT, AND CEQA City of Westminster
The City of Westminster comprehensively updated its General Plan in 20i6 As part of the General Plan Update the City established new mixed use land use designations to guide futu1e development th1oughout the City De Novo Planning Group is in the process of assisting the City with a comprehensive update to its Zon ng Code. including text i:ond map amendments necessary to :reatc consisten-:y with the General Plan. /l.s part c,f the fi1st phase of work (Phase A). which was completed in late 2022 De Novo Planning Group prepared new development standards form ixed use development including 91 aphic renderings of objective desig 1, standards. This effort was also customized to implement the program requirements associated with the City's 2021-2029 Housing Element A robust GIS analysis of the City s General Plan Land Use Map and current Zoning Map was also prepared and the Zoning Map was amenoed to impleme,,t the General Plans la rid use di1ection Phase B of the proJect will include a comprehensive update to all sc~ctions of the Zoning Code beyond those necessary to create consistency with the General Plan Included in this effort will be an update to the administrative procedures multifamily design standards. allowable uses. and development standards for all residential and commerctal zones
Date Range: 2019-2023
Key Considerations
» Public edl!lcation
» Trilingual engagement
» Compliance with State
Housing Law
;> Streamlined futu re
development
» Stakeholder involvement
De Novo Planning Group
Whatever language you speak, we're glad you
call Westminster hom .
"""'1i w .. nt VUJf i )P",l Of' t OU.) r1~ Ill v.,.e~ 1-n.r:"~' J -q I ...,i. ~ ( r ..._4'"14 V. ,, t Of
n ·.c• o. ,,.., ,u: I " u. ;a·
Qveremos su opinl6n sobre las vivlendM
en Westminster.

TMfe! d~ ermen10 de VM~dl e-n hnn: Ju.,,,..,. J d.cl1ci«nbr• I 5·30 pm Chung t6 1 mu6n quy VI oong gop y
ltilln ♦ nhi o, tai W..1 tmi1'111t0t.

C1udad de Westminster 2021-2029
Actualizaci6n del Elemento de Vivlenda
... '""' 0 U ·,-,i.•,~·· , .... "'!'I •• .,, .... , )·,~, :, -..... .. • ~· ' •• , ... s ... . ,.. .... •. ,._,. '
··-·--~· ... ,,..,, ,,-: .... .. 1 ... -•· ......... .
,., ...... <. .. •• • , .............. ,.1 ... , ........ ,, •~ -~ ,,,_ ,.. ... , .. ••r~ •" ~ ,·< " .-.~-
p, I;, ... ~ ....... ,,. ,.,. .... •• ... .,,. • ' .,_
' .... •· * .• ~ ~ .• ·:.:.::-~:.;.:--:·.~--.-:- ~:~.~: ...._ ___ _. ~ ... , .•• ·-- ----···· -·---·- -···-··-·•· -,-, ..... 61 22
216
Attachment 2
Lagun a Be ach: Comprehensive Zoning Code Update

DOWNTOWN DEVELOPMENT GUIDEBOOK
City of Fontana
De Novo Planning Group led the Fontana Downtown Core Project which included changes to the development code and the creation of a Development Guide. The final work product is the Downtown Fontana Developn-,enr Guide ("Guide··). designed to be a user friendly handbook to help guide development in the Downtown Core. De ~~ovo worked with our subconsultants to identify current market conditions and needed incentives necessary to encourage the type of development the City wishes to see.

The City identifa,d th"" Downtown Core as an area whE,re s:.rategically concentrated efforts could provide increased residential development opportunities and offer more support for mixed-uses within a focused area of the Down town. Development within the Downtown Core is implemented through a new General Plan land use categmy and six new Form· Based Code (f'BC) districts
The, goal of Lhis Guide is to encourage and incentivize continued economic investment in the downtown through a clear process and sGt of standards that allows for cieveloprrent to resp(Jnd to market conditions and reflect c ,anging consumption patterns and preforences for 1·etail. housing. and other life-style choices. This Guide provides mar ket-cJriven opportunities for futu rrc,· investment and practrcal impkcmentation st1ategies for the continued success ancJ health of the Downtown Core. including
Support for housing including mu lti fami ly housing and higher residential densities in select areas:

Updated fo1m baS('d standards and guidelines to support the areas continued revitalizat ion:
» lmp1 oved ;;idministl ative process to facil itate by-right project: ;;ipproval for specific project types.

Development impact fee incentives. and
Top-tier environmental clearance that provide opportunities for subsequent projects to tier off of the environmental document by focusing add itional analysis on any proj>?ct-specific impacts Date Range: 2020-2023
Key Considerations
), Su p po rt f0 r increased
eensity
" Placemakil'lg
)) St reetscape improvements
>) Preser.vation of sales tax
d ollars
)j Multimod'al transp0 rtation
» Streaml ined project af:)J:)roval
,, Analysis of best prac tices
De Novo Planning Grou p
__ .,.,.,.."'"""'....,...,--, A l !Yab.Publlc. Au lm
t..>tct <>..1•, ::1ttl <l-'""""' F';,\",dc ~ t, .,, .,:,1 ,.,. {<>< "I-"~ ~ . l><'d,,:1:1~ 1> <>f ,e;, 1,-<: :,'°"'!k rr allf O•~ ., ~,..... ;•, ,-rc=.ndec,o ,oe,n,~""'',.,r~a,m'ct:abk
:;, fk~ ;;c<!nl'IHl •'>d C'"1ckl 1,., • . 1,,.,11 .u,,.. ,. i c: att>lo.~!J-. , an,..-.1 ::..:uo .. ~""":•'-o •r.
~ .-.OO •hcoQ • "ld ,:--..1 ,:,· cc,n:far,,c:l1,.,.1«•
Downtowl'I IS • Dr rti11atlo11
r...c.,.,., ;~-.u."C''i ~ ;._ .. 'y ,.,•...::! ~,_.~;,u,.-• 1nd i ,a •u •:l'u:m·erc~10 1:M-Jh.>1<'db<i'Nerv<:,.,..
l <>') ;;,, o is1 balnd n ['Q""..1ld:H>rl11Q.,. ~, ,t:. 1_ e •"pl..,,~ ,:. cell~••. >r!I ~ .. vi,r4,, ,~.i b,,,ldi "'""' f-,,A:M-~\ h t:,..t : 'Vr>tln
,,.,n,,ant Conidon;
~ h."!<""•;>-.nr~...., ,c,rrdt>n. >11>11••,... ol
~.,..,,.e,clo· ,,,.rr.il't~, ,-,!>-z,:r,::,•~ bu~-.:.-tl a....i •,. .. ,,cl ;,c;.,. • .,_f rr,.01- ""''"' "' ,~nlc';,a - Do-,,...-.1(-. (,e,e lk.<1-._..,,,-,..~,.,1t.,~ ,. >Ji. .. (::< C',<U,n(. d "H,C(Cl-o:1:,1~ r,c,_¢i>orl:xc!1c r.a::u•1r r.twt.n<!~~ .or:d H·plc,?""<'"\ •,u , :,t,,,,,,.= h•,:o, it DN'a.._. Ho'°'i,,I Opp,ort1,tt1i'riM
~ ,"'tail'-,( , .....,r.Mt, ,( 1-C:f n.'Wl•'Y.! ,..~cri 1,:..,...-...b;-...'ll•:ln:b • ro;..,!..,,..,1n;e:,i-1
1,o, .,_ o•N~c ...i.i s,:.-,. . ,,..,· ...,rte-:, •rc
l•lt-1:-tirl...A11<f"'' <W•'tflll~ll<'r.c l ruden~J
~,.... u uir. ,.., , ~ ~ l,i,l,!t. ;11M1:-u n,•:,1•
r.clt"""'•ho-:><:f,
- -1"11"~-~~- ASltflplfild!:ll'lttlemen1 Pronu
,,.. wt•ml '"'"I :h er.m:.-,,,t ~: pt~ . l:,r,u,·•
r,..;..n;•:r1- r,,..;l,,,1, ~ t.i.~ atl-.,a,.~ :;f 1,,.,.,,~ :!~el\l ~ppot!Jl\':>e'\W"'~ "'"''d.r,,:,.;:;,rrt
1:> tl'l<"rti,.,i,- ..,-: i:,r
62 Ltpnd
__ r.ro-.vn::;,-,;
lo.1r.d.11 v
Q Y.tlfo ln,
e Tr•n•·: U.
23 217
Attachment 2
Laguna Beach. Comprehensive Zoning Code Update

OBJECTIVE DESIGN STANDARDS (JKA EXAMPLE)
City of Palm Desert
The City of Palm Desert has traditionally relied on a combination of design guidelines and discretionary design review to shape buildings project by project. including single-fam ily. multifamily and mixed-use r:,rojects. However. with new State legislatiori this type of review has been replaced by requirements that allow cities to only enforce objective oesigr. standards (ODS) for residential projects JKA was ,·etained by Palm Desert to develop new ODS and challenged by tne City to develop dE;sign standa1ds that reflect the C1ty·s desert setting and character. The 1·esult1ng ODS. both vmtten and illustrated. were first and foremost written to generate alignrnent of new projects with i='alrn Deser: s cm1que tc,pogr aphy. The new ODS emohasize the use ot desert Fiora ·andscape buffers and open space betweer commercial and residential projects the production of shade by both landscape and built-form components and the required use of a more limited material and color- palette inspired by the natural setting. The final work product also includes a d,:,sign sta ndards checklist which outlines all design requirements and options The checklist enhances the consistency and efficiency of staff design ,eview. allowing for faster r;roject approvals.

De Novo Planning Group 63 24
218
°' .j::,.
~aguna Beach· Con,prehensive Zoning Code Update

6. PROPOSED COST FILE Senior Planner/ Assistant Planner/ De Novo Subtotals Design Parking Direct Cost, ACTIVITY Principal Principal Planne r Project Manager Associate Planner GIS Printing/ TOTALS TOTALS JKA KAI Mailing/ TASK/ ACTIVITY Hours $185 Hours $150 Hours $125 Hours $115 Hou rs $95 Hours Fee Translation Fee Phas_e.,1.:-P,roject In itiation - J .l Kickoff Meeting • $700 () $0 0 $500 0 $0 4 5380 12 $1,620 $1,620

1.2 Timclincs and Milestones 12 $2,220 4 $600 24 $3,000 0 $0 0 $0 40 $5.820 $5,820 J.3 Project Management 12 $2,220 4 $600 24 53,000 0 $0 0 so 40 $5,820 $]3,728 $19,548 TASK 1 SUBTOTAL 28 $5,180 8 $1,200 52 $6,500 0 $0 4 $380 92 $13,260 $13,728 $0 $0 $26,988 Phase 2: Public Participation

2.1 Public Participil tion Plan 2 $370 0 so 4 $500 12 $1,380 8 $760 26 $3,010 $3,010

2.2 Project Webpi'.'lge Content 4 $740 0 $0 12 $1,500 40 $4,600 40 $3,800 96 $10,640 $10,640

2.3 Educutior1al M atcrinls 0 $0 0 so 12 Sl,500 12 $1,380 40 $3,800 64 $6,680 $6,680

2.4 Community Workshops (5) and Pop-Ups (1 l 25 $4,625 4 $600 25 $3.125 60 $6,900 40 $3,800 Vi4 $19,050 $2,SS0 $3,500 $25,130

2.5 Plilnning SlaH Round T.ible 4 $740 0 $0 8 $1,000 4 $460 8 $760 24 $2,960 $2,960

2.6 Stakeholder lnterviP.w~ 2 S370 0 so 8 $1,000 4 $460 4 $380 18 52,210 $2,210

2.7 Study Sessions ilncl Hearings 24 $4,440 • $600 7. 4 $3,000 12 $1,380 0 $0 64 $9,420 $3,800 $13,220

2.8 Public Participa tion Summary 2 5370 0 so 8 $1,000 12 Sl ,380 60 $5,700 82 $8,0S0 $8,450 TASK 2 SUBTOTAL 63 $11,655 8 $1,200 101 $12,625 156 $17,940 200 $19,000 528 $62,420 $6,380 $0 $3,500 $72,300 l?hasj!J: Assessment ~

3.1 Zoning Code Issues Summary 8 $1,480 4 $600 24 S3,000 60 $6,900 44 $4,180 140 $16,160 $5,000 $21,160

3.2 Zoning Code Update OutlinP. 4 $700 01 so 12 St.SOD 7.4 $7.,760 0 $0 40 SS,000 $5,000 TASK 3 SUBTOTAL 12 $2,220 4 $600 36 $4,500 84 $9,660 44 $4,180 180 $21,160 $0 $5,000 $0 $26,160 Phase 4: Draft Zoning Code Update

4.1 Administrative Drnft Zoning Code 18 $3,330 12 S1,soo 80 $10,000 120 513,800 180 $17,100 4]0 $46,030 $06,030 d.7. Administr,:1tive Draft GP Amendment 2 $370 4 $600 12 Sl,500 30 S3,450 0 so 48 55,97.0 $5,920

4.3 Administrative Drc1h LCP Amendment 7. $370 4 $600 12 $1,500 24 $2,760 0 so 47 $5,730 $5,230

4.4 Public Review Draft Zoning Code 12 $2,220 G $900 26 53,250 40 $4,600 80 $7,600 164 $18,570 $18,570

4.5 Public Review Drilft GP Amendment 2 $3 70 2 $300 6 $6 16 $1,840 0 so 26 $2,516 $2,516

4.6 Public: RPview Draft LCP AmendmP.nt 7 $3 70 7 $300 6 $750 16 $1,840 0 $0 26 $3,260 $3,260 TASK 4 SUBTOTAL 38 $7,030 30 $4,500 142 $ 17,006 246 $28,290 260 $24,700 716 $81,526 $0 $0 $0 $81,526 Phase 5: Objective Qesign Standards

5.1 ODS Kickoff ;_rnd Context Evnlu;:ition 4 $740 0 so 16 $2,000 0 $0 0 $0 20 $2,740 $18.780 $21,520

5.7. Objective De5ign Stand;nds 12 s2,no 0 $0 24 $3,000 0 so 0 So 36 $5.220 $32,480 $37,700 TASK 5 SUBTOTAL 16 $2,960 0 $0 40 $5,000 0 so 0 $0 56 $7,960 $51,260 $0 $0 $59,220 Phase 6:IP.ublic Hi.irlncs andrAdoption

6.1 Public HccJrincs 18 $3,330 6 $900 30 $3,750 JS $1,725 0 $0 69 $9,705 $9,705

6.2 Final Zoning Code 0 So 0 $0 4 $500 12 $1,380 10 5950 26 $2,830 $2,830

6.3 Final GP Amendment 0 So 0 $0 2 $250 6 S690 10 $950 18 Sl ,890 SJ,890

6.4 Final 1.CP Amendment 0 So 0 $0 7 $250 6 $690 10 $950 18 $1,890 $1,890

6.5 Final Objective Design Stc1ndards 7 $370 0 $0 2 $250 0 $0 0 $0 4 $620 SS.560 $9,180

6.6 Implementation 4 $740 2 $300 16 S2,ooo 24 $2,760 12 $],140 58 $6,940 $6,940 TASK 6 SUBTOTAL 24 $4,440 8 $1,200 56 $7,000 63 $7,245 42 $3,990 193 $23,875 $8,560 $0 so $32,435 Phase 7: Environmental Review
7 .1 Notice of Exemption 0 $0 2 $300 0 so 8 $920 0 $0 10 $1,220 $1,220 TASK 7 SUBTOTAL 0 $0 2 $300 0 $0 8 $920 0 $0 10 $1,220 $0 $0 $0 $1,220 Subtotals 181 $ 33,485 60 $ 9,000 427 $ S2,631 557 $ 64,055 550 $ 52,2S0 1,775 $ 211,421 $ 79,928 $ 5,000 $ 3,500 $ 299,849 , .... , • • I ' .. ,, ·v', y -~ ' - • •-: j •
Optio'n;:i.ljPQ;.iscl7: Environmen tal Review - 7.2 Option B • Initial Study/ND or MND 0 $700 24 $3.600 60 57,500 68 $7,820 7.8 $2,660 184 S22,320 $500 $22,820 fi"OTAL FEE WITH OPTIONAL' PHASE 7" OPTION B !INITIAi: STUDY7ND OR MNDT""'"~ • -~- ~ ' ' ~~~~~,~-~~$321;°449 ,TOTAL FEE WITH OPTIONAL PHASE 7 • OPTION C (ADDENDUM) - . ,· - .. . . $317,369 Subconsuhants .iml Direct Costs are billed ut no rni.lrkup. De Novo Plnnnlnc Group reserve!> the right to re.illoca le budget between variou:,, consultine team members and between ta~ks, provided the over;;1 tl project budcet does not chance. 25 ►
::I:
$:I)
(")
8 (l)
::l
......

N
219
Attachment 2
Laguna Beach. Comprehensive Zoning Code Update

7. EXCEPTIONS
De Novo Planning Group has carefully reviewed the RFP. Scope of Services. and draft Professional Services Ag reement and we have no exceptions. additions. and/or deletions to provide. There is a clear understanding that the Consu ltant wil l execute the City's Agreement without any substantial changes.

De Novo Planning Group 65 26
220
Attachment 2
Laguna Beac h Comprehensive Zoning Cod e Update
8 . OTHER INFORMATION
In accordance w ith the Request for P1·oposals (RFP). we understand that we n,ust disclose any potential conflicts of interest in order to be eligible to be awarded a contract. In response to the information contained within the RFP on

Page 5 ends

1. Previous and Current Contracts with the City of Laguna Beach Project Name Contact Description of Services Dates of Service CEQA On -Call Amber Dobson Planning Provide on-call CEQA August 2022 - ongoing Manager Services
749 Marl in Drive IS/ND Amber Dobson. Plarin1ng Prepa1 at ion of techn ical October 2022 • May 2023 Manager studies and an In itial
Study/ Negative
Declaration
2354 San Clemente Is; Mari'la Caron . AIC P Preparation of technical February 2023 • ongoing MN") Principal Planner studies and an In tial
Study/M itigated Negative
Declaration
385 Nyes Place IS/MND Marina Caron. AICP. Preparation of technical March 2023 - ongoing Princ ipal Planner studies and an In itial
St udy/Mitigated Negative
Declara tion
820 Gainsborough Drive Manna Caron AICP Pre paration of technical July 2023 · ongoing IS/MND Pr1nc1pal Planner stud ies and an In itial
Study/Mitigated Negat·ve
Declaration
Ceanothus Drive EIP Anthony Vie1·a Principal Preparation of technical December 2023 -- ongoing Plann01· studies and an
Envimnmental Impact
Report
Piddle Field Park CE Alexis Braun. Recreation Preparation of technical February 2024 • lv1ay 2024 Manage1 stud ie,, and a Categorical
Exemption Report
Pickelball CEQA Alexis Braun. Recreation Preparation of an Currently on hold Manager environmental con5tra ints
evaluation for pickelball
court options

2. No disclosures to report related to any current or retired City official or employee, or City official 's or employee's immediate family member(s) that has/have ownership interest in Consultant's company or is deriving personal financial gain from this contract.

3. No disclosures to report related to any City official or employee that is contemporaneously employed or prospect ively will be employed by the Consultant or Consultant's subconsultants at any time during the Project period known to Consultant at the time the proposal is submitted.

De Novo Planning Group 66 27
221
Attachment 2
222

EDUCATION
MA, Urban and Regional Planning,
Un1vers1ty of California Irvine
BA, Urban Studies and Planning,
University of California San Diego
BA, Political Science: Comparative
Politics ,
University of Cal iforn ia, San Diego
Study Abroad Program ,
University of Sussex

ORGANIZATIONS
Urban Land Institute
International Association for Public
Part1c1pation (IAP2)
American Planning Assoc1at1on
Congress tor New Urbanism
Attachment 2
An1anda 1.,ropiano

PRINCIPAL
Amanda Tropiano is a principal with De Novo Planning Group and is responsible for leading the firm 's Southern California practice With over 15 years of professional planning experience in the region, Amanda has successfully managed a wide variety of land use and environmental planning projects for public and private sector clients including numerous General Plans specific plans corridor plans , strategic plans sustainability programs, visioning projects, transitonented development plans, zoning documents , outreach programs, and CEOA projects. Amanda is also an IAP2 trained public outreach practitioner and has completed project management training with PSMJ Amanda consistently brings to the table her passion . creativity. and strategic thinking to make sure every proiect exceeds her client's expectations Amanda also supports the land use due diligence efforts of clients throughout southern California and assists with navigat111g public agency planning procedures . reviewing existing regulatory direction facilitating the entitlement process, and serving as a l1a1son between public agencies and private developers

RELEVANT PROJECT EXPERIENCE
General Plan Update, Housing
Element, and EIR,
City of Lake Forest
General Plan Update and EIR,
City of La Verne
General Plan Update, Housing
Element, EIR , and CAP,
City of San Jacinto
General Plan Update, Housing
Element, Zoning Update, and EIR,
City of San Marcos
Focus General Plan Update and EIR.

City of Glendale
General Plan Update, Hawthorne Blvd
Specific Plan Update, and EIR,
City of Lawndale
General Plan Update and EIR,
City of Campbell
General Plan Update and EIR .

City of Milpitas
Housing Element Update
City of Temecula
General Plan Update and EIR ,
City of Westminster'
General Plan Update and EIR,
City of Menifee·
General Plan Update, Housing
Element and EIR,
City of Yucaipa*
Housing Element Update,
City of Santa Ana'
Irvine Neighborhood Plan,
City of Irvine
Springs Specific Plan and EIR,
Sonoma County
SAVI Ranch Land Use and Mobility
Vision Plan,
City of Yorba Linda'
Vision Plan,
City of Carson·
Crafton Hills College
Village Overlay Zone,
City of Yucaipa·
Downtown Bellflower TransitOriented Development Specific Plan City of Bellflower*
Envision Alhambra 2035 Public
Outreach Campaign and Phase I
General Plan Update,
City of Alh ambra•
Torrance Strategic Plan Update:

Community Profile and
Environmental Scan,
City of Torrance'
Downtown Transit Study ,
City of Fontana•
• Proiect was completed by Ms Tropiano while he was employed at another planning firm
De N ovo Plann i ng Group
••••
68 223

EDUCATION
8A, Engli'!i-h Lii:eratur~.

UnivEfsit:y of Washington, Seattle,
Washsig'!Dn
Master of U..-ban a;nd Re,gion.a:1
Planning,.

Cal Poly Pcmona, Pomooa Califom:.a
0 GANIZATI0N S
Associa !Oil of EnworunerrW
Professionals
Attachment 2
.li\shley Brodkin

SENIOR PLANNER
Ashley
Group and~
cx:8tin
~poosible
is a Senior
ror
P'ta.nna
!he prepara1ioo
alld project
of erwironmental
man~ with
d
De
ocu
~~o
rllE!l s
~
. as well
as a wide variety of~ prc;ects induciing General Plans. Specif.le ordinance updaEB. al1.d lo CEQA gurdelines. Wah O'ller 10 yea~ of exp,eri,ef1,ce, Ashley has prepared and managed a v.anoe-iy of CEQA and NEPA docum il:s fo.- cap5 al pruvemenis, ~ ~ loprnenis, rede"t-elopment and urban infill, warehoosel}ogisrn:s, and public pciicy oocume,m projects, and a var.e{y of pt;,wrig projects inclu,:mg General - , ~ ing Bements. Specific Plans. D~ent Ordinance Updates, and entitlements.

With experien:::e as both a private ccnsutlant a!ld in public se!'Vice. as vrell a:
ex:p~{ ~ in t.oih pc,.xy and environment.al pl-armrnq. A5J:rle.y prm,ides a holistic approach to prujecis and proa'Ctivel'f prcb _m solves.

RELEVANT PROJECT EXPERIENCE
General Plan Update. Zoning Update.
and BR
City of San J.a-criu
General Plan Update. Hawtho1ne Blvd
Specific Pfan Up,dilte, Zoning Update
and BR
City of 'ffldale
Downtown Core BR
Cify of ~
General iPtan Land Use and Zoning
AmenmM!nts EJR
Cify of Gardffia
General Plan Update and BR
City of La Verne
Harpel" Mixed Use Project BR
City of \.\fest 1-iofy,iOOd
2500 Hot1h Hollywood Way Hotel EIR
City of Surbri
749 Marfin Dr Road Extension 1-SJ'ND
ciiy of Laguna Bead,
385 Ny.es Place Projecl IS.Fll!ND
Cily af aflUl\a&adi
2354 San Clemente St Project ISIMND
City of l.agur1a 8E-arh
820 Gainsborough Dr Project ISJ"MND
City of Laguna 8€-adl
1500 Raymond Ave, lndusirial ISJMNO
Ci y of fulerlnn
1901 Via Burton Indus.trial 1$/MNO
Cii}' of fuJertcn
Pilot Trav.e-1 Center Projeci ElR
City of Peiris
9001-0019 Long ~ch Bawl
Residential Projed ISJMNCNEA
City of So!Ah C-.a!E
U-Haui Expam;ion l'SJMND
City of GardErla
Aµplred Medical Exp.ans,ion !SJMND
City of Lake Forest
Cireulafion E~i Up,date ISJND
City of Bell Gardffis
Shepherd North Project BR
City of Gbr6
HOU5iing Bem,ent Update (~ Cycle)
ISJKD
CityofHaw1hame
Housing Bement Upda.t!! jS- Cyde)
City of Orange•. cities a Gle:ndale.

Av..lon, lrnfliill We1s. Rancho Sama
Margarita. Stant.on. W~. lake:

Forest, ~ T anecula
HouS1ng On:linii11De<S Zoning Update
Cityof&mt~
Accessory Dwel g Unit Ordinance
Cfy of Ventura
NorthOrangeCountyCitiesSB7~
Implementation S.tudy
City of Or.;nge'
Small Lot SubdMsion Qrcfinane£:>
Cityot~•
·~was comptetea I>)' 1/h 8~"1 w1llf 6'le- wao ernpJOye-d ilflDOlEf age,ncy ar pianrar.g 11rm
D· t• 1 v o P I a n n I u g G ,. i) u p
• I 1 , I ,. • ti ,,. ,1 t t fl lj,, I , 1,, 1, , . J • ~ I I I, •• 69 224

EDU CATION
Mas er5. Urban and Regional
Plam1ing. California Sta'.e Pofytechnic
UnivF-_rsity, Pomoo.a
:8A. 81.15-iM-Ss E.ccmorn1cs. lklrvers.ty
of Califomi.a, Riverside
ORGANIZATlONS
American Planning Association
UC EN SE.SIC ERT !FICA TION S
Ameri c.at1 instjt!Jle of Certified
• t.aflfl.efS, □□ . tw . 0240w
Attachment 2
Sta1·la Barker, ,\JCP

PRINCIPAL PLANNER
Starla Barker .. 6.ICP. a pmcipal - r \\ ih Dr Now Plaming Group whO!.e ptimary responsi>c&1ies are el-we rnanagement and preparatiCfl of errvironmenral documents {lniti St,.)(B,E-S_ Neoa. ive Dec!aratioo. Environmental Impact Reports. and Emnromient.al Assessments). as well as o1her planning ~nts iocb.Jding e~
eneral Plans
St:iri
and
has
Spe(:
st>OO:!ssfu
i Plans
lly
. Wil.'h
managed
over 20
a
years
wide
of
ra,ige
pmfessioo.al
of projects
~
wilh
particular emphasis in General Plans, urban infill. downtown, and redevelopment projects. Utilizng hEf experien:::e in community plammg, Searl.a is regularly inlf'Olved ,n land use and pot.,cy pl,am;ng, lllciudmg the de~nt aoo 1mplement.ab0fl of community outreach programs, and frequently manages and prepares environmental c!~arance documents for city,wde policy planning and redev~lopment projecl:s. Througl her e.ictensi't'l< experience in both policy and environmental pl.arvmg, Stana is keenly aware, of 1he intaactioo between tflE two and COfl5.iste.lllly rakoeis a proaciiv~ and co~ sive approach to und~ianding planning and en'lirormwntal issues and developing sr.wtions..

RELEVANT PROJECT EXPERIENCE
General lPtan Updail:e. Zoning Upda.t.e
and BR
1500 Raymond Ave lndusmal ISIMNO
Cit;• of Fullem'l
City of San J.aooco
Downtown Gore EIR
City of Forrtara
General Plan Land Use and Zoning
Amendments EJR
Cily of Garoefia
General IPtan Update BR
City of La Vern.?
General Plan Update BR
City of~m!Jale
Sunrise Mall Specific Plan BR
City of Citrus 1-feigms
2500 Nonh Hol.llywood Way Hotel BR
City of Burbn
The Harper .Mixed Use Projecl E
Cily of West Holy,.ood
3a5 Nye,s P'!ace IS-/MND
Cily of lagtn3 i:leadl
Marlin Olive IS/NI)
Cily of Lagwa Be.ach
2354 San Clemente ISJMND
Cily of lagLlla Bead,
820 Gainsborough ISf.MND
Ci1y of Lagwa Beach
Hotel Oev-clopment .standards GPA &
Zorn! Cha:rlgE 1£1MND
City of Garner,;;i
1901 V"t.l Burton Industrial CEQA
Cit,• of Fullertoo
Gener:a1 Plan Transportation &
Mobility Element UpcL;ite NO
Cit)' of B efl Gan:! ens
Genera1 Plan Update and EIR
Adde11dum
City of P.am:J10 Santa Marga!ita
General Plan Update and ElR'
City of Rancho Santa Margarita
.Applied Medical Expansion ISJMND
City of Lak.e Forest
Lodi & Leave Seif Stor<11JE lSIHIND
City of Lake Fores.t
Melia Ev~ Residernja! lSIMND
City of Gardena
Olson T ownhomes ISJMND
City of Gardena
Pitot Tr.we! Centet- ISIWID
CityofPa~
2550 Orange Industrial ISIMHD
City of Sij;Jlal ~ I
A-Yanfi South :Specific Plan ElR
Cit)' oi lallcas!ef'
Lido House Hotel EIWCir; oi ~ Eleacii
• Pn;fed W36 co~ri b>j M6. 5-311.Ef 11,t,11~ Stl,;, waE.. E-1Tlp)Jyed a: <iflClrler pt.nlffl9r;m
D t• O V o P I .l n h I II !; G I' 41 U j)
• I ~ J j ~ I' j It,· I • J (1, i, I J 1, 1,, J ~ • 1 ~ I J I f > 70 ■
225

EDUCATION
BA , Economics
University of Western Ontario London.

Canada
Diploma , Urban and Regional
Planning Technology
Fanshawe College London , Canada
Ross Minority Program in Real
Estate
University of Southern California Los
Angeles

ORGANIZATIONS
American Planning Association
Congress for New Urbanism
Perry A. Ba11ner

PRINCIPAL PLANNER
Attachment 2
Perry Banner brings a combined 20 years of experience In local government and private practice planning to the firm with work In both the United States and Canada Perry possesses a diverse range of skills 1nclud1ng proiect management land use analysis and policy development His capabilities also include economic development and real estate development
Perry has successfully managed a wide variety of urban planning proJects. 1nclud1ng general plans. community plans. specific plans transit-oriented development plans zoning documents and public outreach programs His passion lies in l1elping communities neighborhoods. and their residents visualize the future and gIvIng them the tools to make well-informed decisions He believes in quesnoning conventional wisdom and always looking at problems from multiple angles and viewpoints to find effective and InnovatIve solutions to develop plans that create results Perry also supports private sector clients 111 navigating public agency approval processes

RELEVANT PROJECT EXPERIENCE
General Plan Update, Zoning Code
Update and EIR
City of Lomrta
General Plan Update and EIR
City of San Marcos
General Plan Update and EIR
City of San Jacinto
General Plan Update and EIR
City of Lawndale
General Plan Update and EIR
City of Rolling Hills Estates'
Community Plans Continuum Project
County of San Bernardino •
Housing Element Update (6th Cycle)
City of Stanton
Housing Element Update (6111 Cycle)
City of Hawthorne
Housing Element Update (6111 Cycle)
City of Westminster
Housing Element Update (6th Cycle)
City of Sausalito
Housing Element Update (6111 Cycle)
City of Sonoma
Housing Element Update (6111 Cycle)
City of Matinez
Local Hazard Mitigation Plan, Safety
Element Update and EJ Element
City of Glendora
Local Hazard Mitigation Plan and
Safety Element Update
City of Lawndale'
Meredith International Centre Specific
Plan Amendment
Craig Development Corp/City of Ontano'
Pueblo Viejo Implementation Strategy
Plan and Design Guidelines
City of Coachella'
One Metro West Specific Plan and
EIR (Peer Review)
City of Costa Mesa•
Small Lot Subdivision Ordinance
City of Orange
TOD Overlay - Marine Avenue Green
Line Station
Cities of Lawndale. Hawthorne and
Redondo Beach'
Commercial Cannabis Program
City of Pasadena·
Short-term Rental Program
City of Pasadena•
SOMO Village Development Project
City of Rohnert Park
Pilot Travel Center (Palmdale)
Pilot Company
14151 and Normandie Townhomes
Project IS/MND
The Olson Company
• Project was completed by Mr Banner while he was employed at another agency or planning firm
D e Novo Pla nnin g Grou p
••••
71 226

EDUCATION
MCP, City Planning, Urban Design
Concentration
University of Pennsylvania.

Ph1ladelph1a
BS, Urban, Rural, and
Environmental Planning ,
Brigham Young University Provo
Research,
Cambridge University (UK), Pembroke
College

ORGANIZATIONS
Urban Land Institute
AICP Certified American Planning
Association
AICP Certification# 35377
U S. Green Building Council
LEED AP BD+C
Credential Id# 10433552-AP-BD+C
Attachment 2
l\1egan Thorne, AICP, LEED AP BD+c
SENIOR PLANNER+ DESIGNER
Megan Thorne is a senior planner and project manager with De Novo Planning Group. With over 15 years of professional planning experience. Megan has worked on a wide variety of planning projects for public and private sector clients including numerous specific plans. general plans corridor plans , site plans design guidelines. strategic plans. sustainability programs. visioning projects. transitoriented development plans , zoning documents, outreach programs. and 3D vIsuahzatIons Megan possesses the ability to think creatively and envision change while keeping projects grounded with achievable bencl,marks and implementable policy goals She excels at communicating complex information and policy ideas In a compelling and simple manner As a designer Megan has differentiated herself with her hand-drawing abilities as well as her technical skills Her technical expe:i1se includes 3D modeling. graphic design. and web design She continues to pioneer ways new technology can improve old processes from community outreach approaches to the web-publ1cat1on of planning documents

RELEVANT PROJECT EXPERIENCE
Burbank Media District Specific Plan
City of Burbank·
Rialto Specific Plan Update
City of Rialto'
River Walk Specific Plan
Stanislaus County
Downtown Bellflower TransitOriented Development Specific Plan City of Bellflower•
West Carson Transit-Oriented
Development Specific Plan
City of West Carson'
Morena Corridor Specific Plan
City of San Diego•
Long Beach Southeast Area (SEASP)
Specific Plan
City of Long Beach'
Stanton Plaza Specific Plan
Amendment and EIR Addendum
City of Stanton*
Airport Gateway Specific Plan
Inland Valley Development Agency·
Harmony Specific Plan
Lewis Companies City ot Highland'
De Anza Revitalization Plan
City of San Diego*
Fontana Downtown Design
Guidelines
City of Fontana
Irvine Neighborhood Plan
City of Irvine
General Plan Update and EIR
City of San Jacinto
General Plan Update and EIR
City of La Verne
General Plan Update and EIR
City of Lake Forest
General Plan Update and EIR
City oi Westminster•
General Plan Update and EIR
City of San Marcos
South El Monte Zoning Code Update
City of South El Monte'
Hemet Zoning Code Update
City of Hemet'
ADU Ordinance and Guidebook
City of lone
City of Bellflower Sign Code Update
City of Bellflower
Temecula CAP Baseline Study
City of Temecula'
OCCOG Geospatial Solutions
Orange County Council of
Governments•
Housing Policy Leadership Academy
Southern California Association of
Govern men ts'
Livermore Downtown Visioning & Site
Planning
City of Livermore•
' Pro;ect was ccmpleted by Ms Thorne while she was employed at another planning t,rm De Novo Planning Group
\ I .1n1' ~" f,!.111n111'i,:, p.,-~ ~II .01,1 t n~' •1111111, nt.d I 1r 1-1 •••• 72 227

EDUCATION
BA.. PoCific.ikl Scienoe-.
!Jniv,ersity of Calif~ Los ~
Master of Oi!i; and Re,gion ~
Planning.

Cal Pofy. San l Ob!;po

ORGANIZATIONS
.A.meric..311 Planning Ass.ociat-oo
Associabcn of Errwcm,entai
Professionals
Congress fur he New U~m
UCENSES~ERTIRCAT~NS
Arneri c.a11 lnsti'tute of Certified
~. 2023. No. 34366
AWARDS
201Q CaYomia Ptan,mg Foono:iation.

CeniJ' , Coast Section Scholarsh!p
20t & 2:02tJ Errett Fish€r Foundation
Scholarship
Attachment 2
Er·k Anderso11" AIC:P

ASSOCIATE PLANNER
Erik has worked oo a rliverse range of~ for public and pm1.ate seaor clients. with a fu>.::l.ts on enw-ooment.a! and ~y JMaM.ing. !and-use planning, and policy deveiopmenl Erik prOVN:les proje-ci support in me preparation of CEQA docum8Ttation and long-r- ge p,ann- g documents. inci•.}1j ing G.ene-ral Plans, Housin,g :i:_lernen•s. and Zonir.,g upda es_ His e~ includes g--..sS1oots lobb.ying w'ith a ncm--profit enviroome oryaniZ-aAion and wcrk in me legal field.

Erik is. pasSI.Of\ate abool S>?f\ling oom!TM.lciiies and C1"e-.ating inno11ati111? rrort throogfl place-based developmem. strategies.

RELEVANT PROJE CT EXPERIENCE
General Plan Upd~. Zoning Upd~.
and BR
Dly of San J.aonto
General !Plan Update. Hawthom e Blvd
Specific PLan L.lp,date, and BR
Cd:y of l.amidale
Zor.i~ Update ,a,nd Adclie-ndum to
Gt-nera! Pi,.a,n BIR
··y of Westminster
General !Plan L.arn:f Use and Zoning
Ame-n<ments ElR
City of Garclala
General PLa.n Up,date alld El'R
~ ( uf RE<! Bluff
Downtown Core EIR
City crf footala
Mountain House lnrorpOfa-tion IS/ND
San Joaquin County
SR-120 rnterchaf11Je IS/MMD
C;1>J of LalhrcpJG.:wans
Cin::uliatioo Efemenl Update lSJNO
City of Bell Gar~ns
U-Haw Expansion lSfMND
City of Garrlena
Pifot Travel CE:nter IS:fMND
·y of MorEflO Valley
23:)4 San Clemente 1£fMr-tD
City of Laguna tle-ach
385Nye-s~ ISfMNO
City of l.ajp,a Beach
1500 Raymond Ave lndus.tJi-al lSIMND
Cit}' of Fuflertoo
1901 Via 8urton Industrial CEQA
City of F1.1Uer'.oo
Applied Medical Expansion JSJMND
Cit)' al Lake Forest
2500 North Hollywood Way BR
City of Burbank
The Harper Mixed Use Project EIR
Cit}' of We:.t Hollywooo
Focused Gen£'fal Plan Update
CityofGla"idale
Local Hazard Mitig;afion Pl an
Laguna Hills. CA
Housing and S.af;ety Element Update
City of Rancho Santa Margarita
Housi ng Bement Update {P Cyciej
c· ies. of Lawndale. Glendale.

Hawthorne. La Verne. Avalon. ~
Forest. aocho Sama Margarita,
Westminster, Martinez. Temecula, and
San Jacinro
General Plan Updat1?
City of McFarland•
Mcfarland Zoning Code Update
City of McFarland"
• Pro~ 'A'as ro<n~!Bj b)• lk Aooe,,;oo wllile eflf"Oled as a Gra~a.."2 s>.ooen: Ill City afl.<I Reglcral P1 iYJ[jng a1 C.J ;,o/y, San LU!& ~
l> (\ N o V o I' I ,l h 11 I •• g G 1• ~~ U p
• I J I J ~ I j o, , I • I [1, I/ 11 • I ," I • I , , , 11 I ~ ' t I l I, •• 73 228

JOHN KALISKI, FAIA, NCARB
Since 9raduat11g trorn Y&le ii.rch1tecture S':h% in 1982. Jor,n Kali:;k1 has r,acJ ,1 c11ve1·'..,e career .;:;s an uct-1tect. urban designer. teachH. anrJ vmter. Befo1e :;tartirg hi, own prac:1cE. r, s prc.,lessronal work ·nr_ludeo f1vE- ;ecns as a designer cl Shidr-nc.,re Owings k1e • 1. first ir Houston. then in l.u~ A ,gc !es. fol1uwed oy f ve yea's as Princ1pa1 Arc.~ tE'ct of th€' Community RedeveloprT•er-t Ager,cy of tl·,c- City 0! Loo Ange es. He began;, private p1·act,r:.0 1n 1993 as a prir1r:.ipal ot AIJV.. In 1994. he was rH:::gnizf:'d by TIME as onE· oft fty leaders wr,o will ,hap0 the twer1l"{·f1r,t c.e1l"'J'f F:;ur tirres a Fel!ow o" 1 ·1e Moye, ·, lrist1'ute on C11y Design.,. e servf:'o as f'res,oe· t in 2009 of the _:;s /.:,celEs C /-,apter of the lw1e·1ciln ln~.t1~ute of A'crirects (A lfa ). --ii' wri~ ng> on cities and arch1ter:.ture have appeared in Desrgr 8ook Review. the Harvard Gr&duate Scr;ocl of Design Magazine. Ar-<C/1. California Arc', itec:. Log and (1'.e. as well as the w·authored book. L veryday uuar, s•n. pub 1s heo 1n 199~ and 2(109. lie I a~ lcugl·,t r11sto1 /. theory. and studios at UC _A, USC. Ca, Po,y Po1Tc,n,1. :,(1-A··c. P,e UnivH~1ty oi Hou:;Lu, and Th0 u<vus-l·f r,f Mich,gcn.

Since foJnd inq .John l\oi1~ki Architect, i11 200D . ..101·,ri",, work 'icJ, 1nr:.luded des1qn guiCJel nes for thE Hollywood Boulevard D1s lrict. a v;sior pla·1 for Lo~ Angele,· Cren,haw cornmuri1ty. the Ocean Park 6oules1ard Crw,pletf'! Gr!'-er Street. de'.:ign of affordable sn'all lot subd 1v1s:on townl·,orres for r:nterpri•,e Fr,u,di:lt1on. des ig n of non-profit 1"1ed1cal clinic, for Miss ion Cit; Cornrnur 1ty ~ietwork. tt1e urba n de'.:ign of Metro·~ East San Fernando VollE•y Trc1n~1t Corridor project. privatf:' r,c.,mre,. arid o,,er 1,000 units of rnulti-f6n1 ly housiny. His design wor1<. and writings l1c1ve been recognized witr, aws rds fro1n 1r,e !>.IA and the Arnerican Plarn1nq A'.,socicJ·ior,.

On i'Joth urban rJr:,siyP cr,d arch1tr:clure projects. Jot,n ,E•eks to en, call'/ integrate cl:ent as well as pubic concuns ar,rJ aspi1at10r,s into practicable design outc.on1P',. W1:h tr1ef decades of e,p0rienc0 work1no w,1h ar,d 'or cl er ts and comrnun1t1es .. ohn ha: dPve1op0d the in,1ght to bring together rnLll 1plr, viewpoints rt:; r_onstrutt1b e ;:;rchitr::cture anc urban design that celebrates H1durn·,g corrnnunq rna\\1r10.

SELECTED PROJECT EXPERIENCE
Palm Desert Residential & Mixed-Use Objective Design Standards, Palm Desert, Ca lifornia. (2023-0ngoing )
Pr i11c1pal / Produced measurabi<= and quantifiable <Jes 1gn stardaros 1n Paim De~.ert tnat reflect t1e desert ls"dscape :",rougr cor'lrnur1 ty Pnqagemer,t 'occurrinq t hroughout the proJec: t1n>e l:ne.

Attachment 2

EDUCATION
Ma~ter ol Architect ure
8anelor ot l>.rts. Arr:. h1tecturrc
Ya le Univer'.AY
New Haven. Conner.t1 ·:ut

REGISTRATIONS
Professiona ,t, rcb1tect
Calitorn1a #C1794S
l•Ci

PROFESSIONAL AFFILIATIONS
Fellow, Amer:can lnst-ture of Arcr,1tect• ...

I OS Angr:,les
Merrber. !~at·or·al Cour-c-1 o1
/\rr.hiteclursi F<.e:rstratic1r, Boards
Mernber. Soutre0 r Ccl!ifJrn1,, 1>.~sor.ia\101·,
o' Nor,- Profit rlous 1n<J
Past lv1embfr. \lv rndrnr VillagE- Historic
Pre~ervatiori Oierlay District /-1dvisory
Board

YEARS OF EXPERIENCE
El Segundo Multi-Family Housing Design Standards, El Segundo, California. 4o (2023-0ngoing)
Principa! / /l.nalyzed built-form (.haraclu of E-1 ~iir,g singlE- f;_;rnl/y neig hbo 1· nood~ and prepared :t-iroJgr an acr;elPrated erg ht week ~CnPoule text amendment~ to :tie er1•,t 1ia zon ng code.
74 229

JOHN KALISKI I SELECTED PROJECT EXPERIENCE (CONTINUED)
East San Gabriel Valley Area Plan, Los Angeles County, Californi a. (2021- 2022)
F-'rinc1pal / Olr.erved th1c built 1orm condition~ of ,ingle fam•ly neigr,borhoods and put together policies that focused on building orientatio1. land~ca pe erihancement. connectivity and enhsnced gathering.

El Segundo SB9 Unit Study and Design Recommendations, El Segundo.

California. (2021)
Principal/ Analyzeo bu1,t-form character of existirg single farni1y ne,ghbo,- hoods anrJ prepare through en accelerated e1qrt week schedule- text arnendmen\S to tl,0 r-x1st ing zon ing c.odP
Santa Barbara Economic Feasibility Study, Santa Barbara, California. (2021) Princ,pal / DevelopEd 12 three diw,n,1onal diagrarrn1at1c prototype: to examine the 1rnoact to mult1-unIt prorJuurcn oy sh1tt1ng frc-,n a densItv• t;;sed zoning c.tandard to a Floor /\rea Ratio (Fl> R) stanrJ~ra.

Downey Single-Family Residentia l Design Guidelines. Downey, California. (2018-2021)
Prrnc,pal / Based on commJnitv engagerneni and public workshop feedbach. created new srnqle-farnily 20re text arrrendmrnis and de'..1gr, guidel,nes to ,·educe tJurlcJ1ng bu!, and relate riew co1structior and sec::rnd 1100· addriiors to prfvail i,-,g cond1t1on·, ir, tr,,s 195o·s ',Lburbar, town.

Culver City Single-Family Residential Development Standards and Guidelines, Culver City, California. (2020)
Prinr,ip2d / RecomrnendDtion, for R' developrnent standards and developrnen1 of de:,rgr guide ines add res'., s1nglE-ldrn1ly mass. bul~. and charor.ier to con- :;erve ~rrigle-farnily neighborhood: n lul r City
Culver Crest Single-Family Neighborhood Hillside Development Standards, Culver City, California. (2017-2018)
Principal/ ':,1ngie-1arn Ily bulk. rn;:,s~ .. one arc.hIi ect urol cr,aracter st1,dy. qeoter.rr; r.al review a1cJ rec ornnendatic:rs. cof1lparative h1 lls1d e zonir,g ar,al·1sIs. cornrriunItv outreac r. devel0prnrnt star.dords. and eduu,tIonal dEs1gn quidelrnios
Burbank Single-Family Neighborhood Compatibility Review and Design Guidelines, Burbank, California. (2015-2016)
Princ,pal / Work ng as a subconsul:ar,t tc Dyetl and Bnat a. JKA updated f~i zon ng coce ~tc,noc:;•ds and introduced new design guioe!ines to arJdre~s tre ··rnansion1zar 1on·· o1 ·esIoence;,. as •;eII ;:,~ drafted a --~Jeighborr;ood Cornpatibi!ity Rev1evr procesc and developed il Df~'gn Gu 1del ine Check 1"!.

Beverly Hills Single-Family Mass and Bulk Study, Beverly Hills, California. (2013)
Principal/ Work no as a subconsul:ant to Dyett and Br,a:1a .. XA revrewec ex1 stIn'J cond1t1on, and developed recomrnenoot1onc for stsndards c',d guideline·; t hat addres s eYcessIve -:;rngle f,:;rr:i!y 'Trass and bu'k to conserve the Centra i M,:,a·s r·Es drntial garden charr1.

Santa Monica Multifamily and Mixed-Use Land Use Designation Design Guidelines, Santa Monica, California. (2011-2016)
Principal/ JKA was a';ked by the City of Sa1ta Monica to develor:; design quidelinf?:. for multi-tarnily and nixed-use corridor di~trir.ts. 75 Attachment 2
AWARDS
Arnericar, Plan ning Association Lo>.

Ange'es. Urban Desiyn Award of Mem
for City ct Downey Single-Family
Res idential Des1qr, Guidelines. 2022
(with City of Downey).

A1ner1can lnstitut1:: o1 A,cl,itec,'..

Cine nnati. Certificate of Appreciation.

Fe b·uary <'.00':.i.

Prog1e~:,1ve Arcr,rtecture /-1ward MTA
PHJes\r1ar Bridge. 2000 (v1,1h
Mc,rp··,osIsJ.
/,rnenr;an Flanr In'.) f, ,soc1atIon i-ousron
'.:>ect,01, Highest l lonor tor Jourral1sm.
'"The lvlain lded: A C.01nµ£:>titio11 fo r
f~emaf-ing Ma rn S\reE-1". 1999.

American f'iann,n'.J A~so~iaticn 1-'ou'..ton
Sr::ct·on Highest Honor for Stratr::r;ic
Plan •r ing. The Hr,uston FrcJmework. P98.

Tirne Ma9azi-1e''.. ··50 For U-,e Future
Rc,'..ter ot I, •neI ,ca·s mo·,t prorn1sinq
leaders oge -"O anc under ... uece1nt;er ':,_
1994.

Natrona I [rdowmern tor the Arts
Ind ividual Projec1 Grant. '"An Urlion
Des1gr, lv'lanual for Los Anqr;le"
Bou levard Cor ridus··. 1992.

Chr;stoph"'' - unr, ;ird Mfmorral
SchclArship. Yale Univers·t v (presented
for ovtstand1r,g academic petorrnar,ce
in p an11ingL 1982

SELECTED PUBLISHED WRITINGS
'"Your l~fxt Fror·t Yard·· with fakE,kc
rajirria. hrnco<.v.. "c::•·K Garden Club. 2CJ 7 .
" t~ rne n '09 for L:.s Angelfs Arcr<irectJrf
arrJ Urban Des1qn·· FORM Magazine:

P1 oneeri11q De~Ign. January/Febr ua 1y
2009
'"Everytloy UI ban Design·· Writing
Urbonism: A Des1,;;n Reader. editerJ b'f
Douglas f<.elbaugh and Kit McCu llougr,.

Ro.Jtledge. 2008.
" The: o;scoments and Pleasures 01 L.A .

Now ... L.A. Now. erJ Iteo by Richard
Kcsralek. Thom Ma-1ne. and Dana Hu:t.

Univer~ity ot Californ ia Press. 2002.
230

AMEE BHATT, LEED AP ND
Amee Bhatt Joined JKA in 202i and r,as se11en years of e-xpHience in arch ,ec- :ure. urbar, des,gr. and p:anning. Ar JK.A. Amee miinages al urba:· cJes,gn or01ects. For tr,e Ea',t Sar Gcbnel ley Area Plcn. she wvrked or, the Conrnun ty Character ano Des,qn Element. which i,1,,olved ar. ar,alys,s of re:; ,d ential. co,nme rcial ond pub lic realm patterns of 24 un1ncorpora:ed cc1nmu·11t1es ano the erection ot guols. pol 1ue~. and action, to enhance u·e E-vol;ing 1,ndscope. Amee has autr,ored r-ult1-farn1ly and mi xed-use obwctive design standards thE,t corn ply wirr SP9 and rnainta, n the character of ,,,nqle-fam- y ·1eiqhb'.Jrl1ood:, in E.1 :>egunoo. Sr1: r,as a sc deve'oped !:Ju1ld 0 ,g
c-ro,otypes an(i r,alr:ulated op,n,ons of rnst fo• e0.onorn1c feas1 b1lit·1 stus,es tor a Beverly Hills Uri1i1erJ Scl1r,o! D1strict-ow1,erJ site en:lor1nq rnulr1-f,:;rn1ly r,ousmg alrernat ive,.

In her prPv1cJs experience as an Urban Des1grer at Dud Pk. l•,rnee rroce ~.ey l<Jnt· irJut1or,s to pro;E·C!$ lhroughcul Soul'ie,n C.allf0rr,1d 11\C!ud,ng lt.e City c f Burl.Jank Complete Streets Plan. Mira lvlesa C0rnrnun,ty Pio n Update. '.::outt; Colton L vc:;b e Co 0 r1dor Plan. Oso Creek Golf Course and Open Spoce V s,or P .sn in tr;<? Cty of Mission V1ejc. and the Meadcws Specif c Plcn in Sierra .aore.

Arr, ee plauis a ~pe'.1cl en-pha:,i 0
; or, the qua lity rJf ihe pub lir. rea1m a·,(1 pedestriaP exper,ence and strives to c1 eate ac:1ve. engaginq. and su~tainable places drawing en t1Er skills as an urtJ;_;n de~1gner.

SELECTED PROJECT EXPERIENCE
Palm Desert Residential & Mixed-Use Objective Design Standards, Palm Desert, California. (2023-0ngoing)
Urban Design Senior P'owr:: Manager/ Produc.ed 'T1easurablf- anc quant f1 ab1e de<.1qn stardards 1n Pam Desert tt;a1. ref lee the deser: la nrJ~r,a pe trw_;ugh corr rn;_1r·ty engageme nt ou._;rrin9 throughout t he project frneline.

Signal Hill Civic Center Maste r Plan, Signal Hill, California. (2023-0ngoing) Urban Desiqn Senior Prr;3ec, Maneger / Developed alter nal1'JES for tutu re rnl,ancement ta 1he Cit y of Signal Hi,l"s Civic Ce ntE:-r. JKA r,eld a 3 day workshop 10 des·gn th·ee a terr.alive; in wh1c·1 !r,e vi,1ons anrJ goals for dft hitec ture and urban design wt?re: generated.

El Segundo Multi-Family Housing Design Standards, El Segundo, California. (2023-0ngoing)
l.Yban Lle, ign Senior Prr;;ect ~1ar1aqer / Analyzed built-rorrn character of eYistirg ;ingle ta'T11ly neig'lborhooos and preprire- t hroug r, an accele ra:eo e,grt week schedule texl arnr ndrnen1s lo ':'1e ex isting zon·ng code.

East Palmdale Boulevard & 40th Street East Masterplan, Palmdale, California. (2023)
Urban uesign Proj1c ct Managu / P-ov,ded a con:eptual rnastE·r pian for an approximatel·f 3?.-aur; co rner sile ir, P6 1rnda!e wrich included a rnir. of uses fro'n comme·-cial to r,!Sidernia i.
76 Attachment 2
1•¥1

EDUCATION
Master ot Architectu1e
6ashelor of Science. Architeci"Jre
Un,versiry of M ich1gan
/• 11n /,rbor, M1ch,gan

REGISTRATIONS
LE E_D AP i'Jeigr, borhood Development
AWARDS
2021 Transpo1tat1011 Plann1nq /1wa1d
APA Los A ngelrs Srcct .c,r fer ··complete
Our Strr:-ets - Bur,;ank Citywide·
Cornplf?te "itrePt'., Pfa n
202') Me, 1 Awdrd. />1rieriec,n Plonr,ing
As:.oci2tion - Inland Erroire Section.
"iouth Co 1or Livati le Corridor Pla r

PROFESSIONAL AFFILIATIONS
M1::rnber. Ameri:ar c.•1anninQ Assoua1ion

YEARS OF EXPERIENCE
7 231

AMEE BHATT I SELECTED PROJECT EXPERIENCE (CONTINUED)
Santa Ana Urban Design & Architectural Consulting Services, Santa Ana, California. (2021-2023) Urban Design Project Manager/ Provided various on call architectural and urban de'.;1yn support 1nclud1ng pro_ects wcli a:; billboard design.

Metro Joint Development Housing Accelerator Strategic Planning. Los Angeles, California. (2022-2023) Urban Design Project Ma -,&ger / Identified te n priority sites based or &r estab lished uiteri& -:; t site attribu,es anrJ read r;e;s to understano what can t,e r,uilr o ong wi:r the physical l1ousing uni\ c2pacily.

Beverly Hills Unified School District Feasibility Study, Beverly Hills, California. (2022) Urban Design 8 roje<.t Manaqfr / Conducted site analysis and context ~tuliy tiy to come up with thre" aesigq ,;ltern1:tives ' or rnult1-fam1 ly hr,using that 1rrlL,Ofd 01·tere~- 0FnsI:Ies.

El Segundo SB9 Unit Study and Design Recommendations. El Segundo, California. (2021) U1l)an De~1q1 ::iroJell Manager/ Analy7eo Luilt-for1r charaLte1 oi exist ng ·;inqle tam ly neigr,borlioor.h cind prepare ll rouqh a0 accelerated e1ghl \',eek scheoule te~t ame··,drnenh to the existi-,g zonmq coce Santa Barbara Economic Feasibility Study, Santa Barbara, California. (2021) Urbcin De'.,1qn Prowct Ma r•aqF·r / DPveloped 12 tr,rrcc- cl rnrr,s1onal diaqrarnrnat1c prototypes 10 exaIrnne the 1rn pact tr, rnu lt1-u ·11l product10'1 t,t ,n1rt,n9 from o oer·,1fy·!.,n,eo zonin9 '.Ja1dard le,; Floor Arrca I~at10 iF.AR) stomJa1·d.

East San Gabriel Valley Area Plan, Los Angeles County, California. (2021 - 2022) Urtar, Jes1qn r'roject Manager/ ObSE:'rved t!ie built for'n rnnd,t1or.s of single fa11"1ly neighborhoods and pur toqc•tl",eI pol1cie~ thcil fOCU'.,<':'rj on building orientat1on. landscoµe enhanu:'rnent. connecliv1ly ar,d enhanced gathe ring.

Pa lmdale Multi-Family and Mixed-Use Design Standards, Palmdale, California. (2021-2022) Urban De'.,iqn Project Manager/ Developed mc•asurab1e criteria that re sident~. applicants and City Stai! can utilize to facil itate il commonly ur,derstoCJd and cor-,,'.,tent d2~1gn approval proces:, I hat also addI ess Palrnoale's high rJesert setting.

Burbank Citywide Complete Streets Plan, City of Burbank, Burbank, California. (2019-2020) * Urt,an Jes1gner / Prepara,;or ottl1e "Cornplete Our Street·, Pian ... With a strong focus on uban desig n and tr,e City Jt 8u1·banf:s bud\ forn1.1he pan analyzes the er,tirety ot Burbcnk''., 28() centerlinr" rniles of :.treei~ c;ncJ proposes irnp:ovements lhwugr· prio1it1zed prsjew,.

South Colton Livable Corridor Plan, Southern California Association of Governments, Colton, California. (2019) *
Urban Jes1qner / Livable Curr oor F'lar t hat a;m'., to strer,gtren gra<,sroots tactical urbanist approac11ES and create au1deline, and policiec that wi!I prov•de;; regu,atory framework for f()rrniJlizinq a de· it-yourself approach tc, neirJhborhood a·ner1t1es and improvements.

Mira Mesa Community Plan Update, City of San Diego. San Diego, California. (2019-2021) * Urban ~J<?'.;ic;ner / Corridor pl2nninc; and l.onceptual uroan '.Jesig n sturJ1es tor four tocu, cJreas witl11n tr,e cornrnun I1y that tr1,t and i!lustrete new approaches to lard use. d1=Veloprnem stanoard~. and rrobiii\y 1mpruvemenls to 1ev1talize the focus area~ and retro! t suburbar shopping rnalls with transi!-supportivrc uses and oe"elopmr,nt typoloq es.

Housing Incentive Overlay Zone, City of Fullerton, Fullerton, California. (2020-2021) * Urben De~1gner / Develcpmer,t cf a i-,ous1119 Ircent 1ve 0•1erlay zcnro plar, tor i5 separate c usters of nc,n -re:,- ident ;al parcels citywid e. The plan evaluates the feasibi lity o' res1der1ti2I de-,e io prnent on thesf parcrols and estab li<,,r, es ti-,e rJeveloprrent <,,tandards along witr, P,arket-tested inclus1onary goals. * Wo rk com pleted at previous firm.
77 Attachment 2
232
Attachment 2

TIM ERNEY, AICP, PTP, CTP I SENIOR PRINCIPAL

EDUCATION
■ MS/MCP, T·ansportar,or
EnginE:eri·•,g & Dla•,nrrig,
Un,ve, sIt1· of Calrforrna
Be,·keley
■ BS. Mecharica I Er,ginee,-ing,
Boston L:n,ve,·s,tv

YEARS OF EXPERIENCE

LICENSES/CERTIFICATIONS
■ /l.mc:1ica11 lnslitu:e of
Cert fied Planners
■ Cert fied -,ansportation
Planner
■ Profe,sional Tran::,portatron
Planner

AFFILIATIONS
• /lrnericdn Piar·n ng
Association (.uPA), Member
■ Institute of Trarsportation
Eng,nE:ers (/TE), Member
Tim Ernev is a cert if e:: rransportar,on planner with exten-:.ive E:xperienc.P ~,n pia,n ng and enginf::er ing projects in California Hi, prinvH y forn, has been (Jr, mar aging analyses arid documentation for envir•onmf'::ntal ,·eview projE:ct,, acces'.. and wcuia: 101· stuciie'.., :ustai,•aole transpo,-:atron practice, TDM rneasur e,, parhng evaluctrons, pede,u an ano bicycre I evif'::w,, and data colle,:tirJn p, ogr arm. !11 addition, he ha, don':' detailed technical analy:,e; r,,f local and, ef,!ronal I oadway fariiitre:, inc'ud;ng t•2ffr: forecasting, modal spit anal,se tr;,ffic oi,1ers10,1, ar ci operational anoly:,es. Hi:' has e>1peI iencf:' coor drnatu,g wrth local arid 1eg1onal tran:portation and env11onrnental agencies in Southrcr 1; C;;lifo ·11;; ;,nd '1a, been le3ding :he f11 ms effo1r~ or th!:' l:'va Iuatron of en1e•gwg tee! WJ!og •:S, altern,•tive E'vc lL.;;tion ri1etI ic,, and the rmp.;ct'.. of new mo!:;ilit\. servi,:f~. f 1 ,;;,,d use and c1rr.1lat1cJr• nr:tw,Jdc-:.

PROJECT EXPERIENCE
Active Transportation Planning. Tim ·1;;;; seI _-eel;;:. project iJI 111cioal f.:Jr sC\lv<'- transpon21· 011 r·la1•n1ng p, ojects th oL-gh,. ut Sr_,uu--.,,-,. ,_' ,;l1fo1 nia Hf:: 'i,;o pr·rNidHJ dir ect,or of tht plarnrng, d1:s1gn ,rnd ev;;luatron 01 ac:!Vf:
t ransµon;,,I·I0I·· co, 1 rc:01 c,, anrve transpon a1I0•1 olan:., data colleclior, prrJgr·a rw .. and forr:cast1nf! T'11·0.Jgr1 the-:.e eff.,)rt,, Trr,, ha, pronrJtec thf:' nc0ed frn a h, lanr"d approach for a!i u,c•r eI c-u,·< 2r1r; t'• r:1,,ure: s;;fi:: cor,v1::n12r,t an:i CCJSleiff:'ctr,,, mobility :·pt r;r'o that :.uppo,1 tie adJan,nt la;od uses anc urban fo,,,, Travel Demand Management. Trrn has been repon,ibls: /,Jr de·,~lop11,g 1mple1nentable ar,rJ d,,ferr<.ibls: I.I aw• demand rna•·1age1nent (TDMI prCJgr i.1I11, Pr 111·,arilv, th,se ,nclude ti· f ev;;lu;:r r;r Jf i'i'e bE',t l UM e!elllentc, tc a·.:hif:'v':' t ,,,0 goa '., 'Ji the pro1e,'. suppo,ted by Oat a ar,d I e'f:arcr developed on a n;;t,or al ba:r: .. In addrtron tothE acicption of s!anrJarrJ TUM rneasure,, <.ur.h as au,ve t1a·11.pr.-rlat1on faCl'rtil':S ;,ncl oark rrg n,ariag,:rw"nt, 'rm ro.1t1re,y wrJrl s Nrth develoµer s to adjust iand u'.i:' progr ;;rn' to betlf:'r internaliz•: trrp', ar-,d to r·ir:,htc,izf':: parking to facilitate 'ahar;,d p;;r f ing :JppcJrl'unities Environmental Impact Reports. Trrn has led 1 he prr::par at,or of :1 ar rd-;,lon,:, ll a-,spoI lat ion rnpar: stuJre'., and tr'a11sc,onatiCJn/,: rcula11on c.Ntrons CJf Elks arid El'.',s :c Lppo,~ C.:Qt> a··,d NE PA pr,xf'::sse:, These projects have iric/,,oed fuii range of pr·rJJf:ct tvpe:, frorn ,ndrv OJal ceveIoprnr:nt pI Ojech, to updated citywirJ,- ul::i11\ tc, ,ig11:f1c,rnt inf1a5·-r 1e1w,., p,·oJf:Ch T;rn !,as 1•1an;;gr:d the ,er.hri,ral ;;1 ,dvs.s b, r.:I! ,nooes of tra,,ei, ,nc udrnf quaiitati,e anr:I quar1: t;,r,ve asse:,,'1,f nl:5 rJi tr a/fir.. trans rt, pedesn ran h.1cyr.l1st, lo,:1G1ne,. ro-,',t 1·wtI011 arid emer gurr-y vehicle C'J11ciit1on, In addil1u11, the,r, pi.Jjecto !,ave a <.rJ Ill eluded tl·C::
cievelcp·T1E-nt ot spPr.1ab:1:-cJ trq:; g~··1p• at;,-;,- 1 ates and use c/ reg1ori,::1I t, C\•£::' dernand rnr.,cJel~ to 01 OJ':".t fut.Jw tr2ff1c v::,lurne< Alternative Performance Metrics. "rrr· has been wor-icrng t: rdent fy ano rJe.t-lop 2it~1 r"1dl l'vE !ilf:trics to L~,·el of Ser\il{.f; H•c·1s} in the =v·aiuotic.r of /;,n;J LSE ;;nd transpoI·tcJl1CJr1 prOJi:Cts. thr'., rnriudES rhe 1dent1f1cat1on on rov, r.itr':S ;:,rrj C(JUnt ie<- neecJ to r;·1odif., i:h::ir currt:r t prog, a ns ar d pol1,:1es 1:c ac(ou1~,t for th!:"sf:
rhangEs /l.s 1,art ·;f t',;,se efforts. T,,n ha, beer, In consul•·ation wi;h ;he 'tate''.

Office of F lan·1irg and P,ese:arc h (QPR) a,d p;;rticip;itr:0 In S·:>ver ,,,! r..onf ~"-r:nu,s and panel cJ SCJS'..ior 1'.. :;,1 the C:fff:'Ct'.. oi vf:'h1cie- rnrles :r ;;vf:':ed calcu,ations and metric: m;;y ;;ffec' crty progra,r,s anc ,1c1··rsport;;,tIon ?.nr.ilvs,, gurdelrne, 78 233
Attachment 2
TIM ERNEY, AICP, PTP, CTP I Senior Pr,nc1pal

Page 2 ends

City of Lake Forest General Plan Update and Environmental Impact Report; Lake Forest, U,,.. Tim managed the evaluation of the build-out of the City's land use program, which included the deterrrnnat,on of potential effects to the rnculation network throughout the city. Specialized assessments were conducted to identify the antic 1pated impact emerging transportation tc>chnologies (such as transriortation-networking companies and connected/automated vehicles) will have on the roadway networks, 111clud1ng the potential to ,educe utyw1de vehicle miles travelled.

City of Anaheim Circulation Element Upgrade., On-Call Transportation Engineering/Planning Services; Anaheim, CA.

Tin, 1s the project manager for an on rail transportation plan111nf! and traffic eng1neern1g services con tr act with lhe City of Anaheim Pubi1c Works Departnwnt. l 1m 1s managing the p, eparat1011 of an ur.date to th12 C:1rculat1on Element of the C,eneral Plan. This will include new goals, pol1c1es and infrastructure projects to support anticipated r,ew development acro,s the city, including specific approaches to address rnulttmoclal travel, active transpo, talion, tTan,1t and <J- a, f'd-1nobilitv serv1c es.

City of La Verne General Plan Update and EIR; La Verne, CA. T11n 15 leacl,ng the a,ses'. ment of the- eva 1uat1on of an updatf: to the Ceneral Plan for the C 1ty of La Verne. Kittelson 1s dewlop1ng r, ave1 demand est1rnatc>s 11smg th,, SCAC-i travel der-,and model, fo, muit1plr: land use alternatives. The proier:t tecJm is propos1,1g ad1c1stnerts to the c1rculat,on network and parking regulations to accommodate tlw fut me Metro Gold I 1ne Star1on within the City and to ,nclueie a 11ew ll,cti-•e Tr,mspo1-tat1on Pliln. Ti'l1 1< also helping thr° City addres': the proposed S8743 cha11ges Lo 111tc>1 Sf:·Ct1on ::indlV'.,1' u11de1 CE QA.

City of San Jacinto General Plan Update EIR; San Jacinto, CA, Tirn was l)IOJect prinupal to scrpprHt tr,e C,t y of San Jacinto r;eneral ?Ian Update and EIR, 111cluding traffic, rnobi11ty, m1ilti1nodal compo,wnts. In rh1< 1ole, hF provided l,1gh level of guidance and quality co,1trol
City of San Marcos General Plan Update and EIR; San Marcos, CA. 1,.n tr,lson Is developing the updated mobil,ty element for the City of San Ma, cos General Plan Update. /.\5 part of the GE?neral Pian Update effort, Tim 1s lead 1ng the multiple efforts taking place as part of this project, 1nclud1ng the development of the mobility r;iernent and its analysis as part of the EIR, as well as the City's deterrnmation of appropriate SB 743 analysis criteria and guidelines City of La Mesa General Plan Update and EIR_; La Mesa., CA. T1rn led the transportation evaluation of the proposed updatP to the General Plan for the City of La Mesa. The Kittelson proJect team developed ex1st1ng conditions for dll mock"; of travPI and estimated future roadway volumes using the S.l\NDAG mode!. The team al~o 1dentif1ed tr,,nsportat,on network impacts and oroposecJ rn1t1gat1on measur.,s to address 1ntersect1on and: Ocldway conditions.

City of Glendale Land Use and Circulation Element Update/Transportation Impact Fee/SB 743; Glendale, CA. l'.ittelson 1s cun er1tly developing an updat2d rnculation ele1nent for thE: City of Glendale dnd upd,;t1ng its citywide tr ave I der1and model. ,4s p;:irt of this l".ffo, t, Kittelson Is prepa11ng a \/MT est1mat1ng tool 'or the, .:·1ty and developing its updated S6 743-compliant t1anspor·tatIon 1rnpact study guidel111es. T11111s leading coordination efforts with the City as ,ts furnre land use plan futme rnculation plan, SB 743 gu1dr;l111es, travel demand model, and VMT est1rnating tools die IJe1ng oeve!oped to ensu, e com1str;ncy between thr:se mult1plE- overlapping effcn< City of La Verne Active Transportation Plan; La Verne, CA. Tirn was the project princ1pai for the development of thr:
first Active Transportation Plan for Lile City of La Verne. Kittelson identified existing bicycle and pcdestrnn travel patterns and ccnflict po11ts and cond11ctecl outreach to 1df:'nt1fy key de,r1nattons and wnstra1ns from tl·e public.

Th!: proiec.t team proposed new bicycle, outes, enhanced bicycle facil1t1es, and improvement pedestrian facilities to encourage add1t1onal walkng and biking utyw1de. Kittelson also coordinated policies and ObJeCT1ves with the ongoing General Plan Amendrnent.

Orange County Transportation Authority {OCTA) SB 743 Support; Orange County, CA. Tn1 as,1sted the range County Transportation Authority (OCTA) in ident1fy1ng the rr:comme11ded approach lo implement Senate Bill 743 (SB743) throughout the Co,Jnty Hf:' led the assessment of options for calc1ilat1ng vehicle-miles t,aveled (VMT) and dr:veloped map based screening tools to illustrate VMT per capita and per employee for each city and TAZ. Tim worked with OCTA staff to modify the existing Congestion Management Prograrn and tr atf1c analy~1s guidelines to 1ncorpor ate \/MT into the analysis process.
79 234
Attachment 2

FERNANDO SOTELO, PE, PTP I PRINCIPAL ENGINEER

EDUCATION
■ MS. Civil Engineering
(Transportation), Un1vers1tv
of Southern Cal1forn1a
■ BS, Naval Engineering,
Un1vers1ry of Sao Paulo,
Bl dZil

YEARS OF EXPERIENCE
22 REG ISTRATION
Profess1cmal Traffic EngineH:

CA tJ lf1. 2770

AFFILIATIONS
■ Institute ofT1ansportat1on
Engineers
■ Orange County T1 aff1c
E ngi11ee1 s Council
Fernando Sotelo is a reg1~tf:'1 ed profes,1onal traffic engineer in California with a master's degree 1n transportation eng1neer1ng. Fernando Sotelo has extensive expe11encE 1n CEQA and the techrncal aspects of t1 ansportat1on pla,,ning, including travel demand forecasting, traffic impact analyses, and parking demand studies. Fernando has been involved with assisting Cities with conducting rransportat1on analyses for general plans and spf?Clfic plans. He also led prog1 an1s to 1mpl1::ment VM T metrics to comply with SB 743. ThesE- efforts ,nc ud1:: rev1ew1ng strateg1f?s to 1dr:>ntify reductions to thE use of s111gle occupancy ,1utomobile use. promote tr1e use of TDM measures to reduce VMT frorn land use projects. and 1dent1fy potential VMT reduction programs. His professional experiencE- with traffic ancJ parking analyse, r1lco include t1 a•,sportat ion analyses for Sr?' er al land developn 1ent prn1er.ts sucl- a, '.,Choo!~ wa'r:hou~1ng, mixed use, commercial, and recrf:dt1on proj1::cts w :,out he1 n and no1 thern C:ilifo· r1a. H.: fcKU'.,•'~ pdrl 1cular attt'11t1011 or1 1SSU£:'~ sucl I as v1:h1cula1 c 1rcul;..tion, sItP ;ic ce,s, quPu1ng, and p1::dr,:,tr 1an I outf''., to '.,Chool and sa'ety.

Fernando understands thr, comple}'.1\1es of transpo1tat1on planning anrl has prepared transportat1cm sections for El Rs for- n1cjor p10Iects ,uc.h d'., gr?ne1 al plar uridale·s ano '.,f)ec.1fic plans.

PROJECT EXPERIENCE
City of Brea Laurel Elementary School Circulation and Parking Study; Brea, CA.

Fernando served as project pr111c1pal for the prr:0 pc1rat1011 of a traffic rnculat,on a•1d parking study for Laurel Elementary School In addition to conducting the study, f ern,,ndo led stakeholder meNings with school staft and parr:nts the :,chool district, City publ1<: works ,;ncJ poller: to discuss issues and potential solutions. Physical and operational recomrnendat1ons were prepared to 1rnprove pa1k1ng and t.raffo within and In the v,cnity of the school campus Several phasf:'s of improvements wr:re p1 epa1 eel, ranging from low-cost sho1t-· term, to costly long-terrn r r:configur at ions.

City of Montebello General Plan Update, Environmental Impact Report, and Transportation Impact Guidelines; Montebello, CA. f".1ttelson 1s developing thr, updated rn culat,on ele1nent for the City of Monteb0llo General Plan UpdatE:
and their Downtown Speuf1c Plan area. Y 1ttelson 1s updilt111g the 1·nobi11ty e!errier1 t's goals.policies, a"d a cirwlat1on nr:twoi-J, to acrommodate the C1t(s env1s1onej land use c:-nd ci1culat1on buildout. The plan will provide an enhanced network of trails, enhancE pedr:strian and bicycle mobility and promotE a vibrant and walkable downtowr, arf?a and neat rail station:... Fernando 1:, sr:r,1ng as thr: lead for the techr11cal analyses to 1,oview t1 ansportation 1mpac.ts unde1 C.E Of\
City of Indian Wells General Plan Update and Environmental Impact Report; Indian Wells, CA, Fernarclo 1s tre prower manager for rhe City of Indian Wells General Plan Update Kittelson 1s updating n,ob11ity element:, fo1 tl·e City of lndion Wells r~ene1a1 Plan Update and performing technical analysis in suppo1·t of the EIR document The rnobility e!ernent focuses on expanding the b1cyclr: and NEV network, integrating rr,g1onal multi-use path connections, 2nd providing cornpiE-te st-eet poliur:s fo1· residents. workers, and visitors. Fernando led thF. comrnun1ty workshop to inform the public and seek input fo1 the mobility element update. r-f0 rnando rnanages dayto-day project activ1t1es, coordinates with City staff. ;ind supports multiple tash of this project, mcluding rhe development of the mobility eler--iicrits. the SB 74.3 Vlv1T gu1dan<:e in traffic impact analysis gu1de11nes. ano p1 eparat1on of the tr ansportat,or study to su ppo1 t CE QA review City of Lawndale General Plan Update/Hawthorne Boulevard Specific Plan; Lawndale, CA. Fernando i:.. the Kittelson project mariager for the prepa1 at1 n of an updated C1rculation/Mohility Plan for the City of Lawndale. Thi, plan addresses existing and future circulation issues. 1nclud1ng the propo:..eo extension of thE Metro (Jrer~n L rne through the city. As p,Ht of this effort c1tyw1d2 goals ;;nd policies were devE:·loped to 1rnprove active transpor-tat1on and _ _ _ _ _ __ _ _ _ _ _ _ account for 11ew vPhicle-m1les traveled (VIVIT) metric: .. In addition, thr, proposed 80 235
Attachment 2
FERNANDO SOTELO, PE, PTP I f'nnop2I Engineer
Pag:7?.
rezoning of parcels along Hawthorne Boulevard is being exp! red to facilitate development of higher density res1denrial uses and mixed-use commercial zones. As LA Metro is planning for a new commuter I ail service tliroughour the area, potential rezoning and enhancemer,ts t access and circulation are being explored. Fernando led the prep;iratIon of the T1·,rnspor tation swdies for CEQ/~ review and Is cun-i:ntly preparing the mobility plan for the Hawthorne Boulevard Sped1c Plan.

Clovis SB 743 VMT Metrics lmplement.ation; Clovis, CA. Fernando served as the pI OJect manager and technical lead for the lity of Clovis VMT metric.~ implementation pro1ect. fas fYOJect manager, rernando managed the consultant team, prov1d1ng direcrion on technical work and deliverables, conducting quality control checks for analysi:. and deliver ables, and leacJ1ng communications with the City The project included establishing metrics, thresholds, so eenIng criteria and a \!MT screr:;nIng and m1tigar1on rool and the development of transportation impact study gu1del1nes. Fernando has prov1decJ sever·cd options for the City to 1rr1plen-,ent specific threshold'.. and sc.re( ning, wns1de11ng the city's cha1 actemtIc5 within the, eg,on. rli? ;;lsv assi,ted the City with OIItr each effo1 ts 111 coorciina11on with tlw building 1ndu'.,t•--v as~oc1at1on 111 thc- Fresno r1rea rJ'., a nIaioI str1keholde1 City of Los Banos General Plan Update, Los Banos, CA. Fe1 nandc wa:, Kittelson ·s pI oiect Inanager and tec.hn1c;il lhid for the-· transportation component, of the I os Banos GEneral Plan Update. fh,c; Kittelson team's tasks havc0 1nclucled ck•velop111g the C1rculat1on E!ernent of the Gener al Plan Update and the c orre'.,poncl1ng Envir onn1ental lrnpact Report {FIR) prepared for envir onn1f•nt;;I •f.·vIr,w under the C:alror 11Ia Envircinmer;t;il Quality Act (C:EOA). Kittelson has also pI ovicieci tI aff1c modeling review dnd fo1 ecd~-t,. roadwav segrnent and Vl\1T anaIysIs ;ind alternative transportatior; OI>tiom. ·:·he iesults of thE:· analysis and t•ansp,xtat or- rernrnrriendat1ons were 1ncl11ded 111 the General Plan Update dr:.cumr:;nt.

Font.ana Downtown Core Project; Font.ana, CA. K,tte,son developed a cir culat1on plan with subst ant1al mod if icilt1ons ro the dovvntown ar,-a ancJ prepared a transportation analysis for proposed Downtown Corr:; ProJect. H"rnando served as the technical lead and pIOJect rnanager. The downtown dIrca includes the Fo11tana 1V1et1oilnk Station ancl City Hall. The Project consists of trcJns1t-or1e11ted developrrent dnd c.h,rnges lo parking ;ind ar; e11hanr:E-d bike and pedestrian network to Inv1gmate I edevelopment and encourage a rrnxed-use 1?nv1ronInent. l<1 ttelson provided conceptual designs to accommodated substantial amount of traffic, bicycle and pedestrian activity In the area, while cons1der1ng constraints with the available roadway right of way Several concepts were considered 111clud1ng roundabouts at key Intersect1ons angled ;ind parallel paI king conf1gu1 ations, a11d several bike and transll facility conf1gurat1ons.

City of San Mateo General Plan Update and EIR; San Mateo, CA. f: ittelson Is developing the updated rnobi!1ty element for the City of S;;v1 Mateo Gene1al P!ar Updatf'. /'.s part oi the G2neral Plan Update effort. Fc1nando served a, ta:ck leadf:'r 101 the: deve!opnw111 of SB 743-consistent VMT nett odologie~ dnd thr eshoids, an off-model Vlv1T spreadsheet tool, arid tI affa study guidelines for proiect, In the City Fernando led efforts to ddopl C1ty-spec.dir:
metr Ics. thresholds, and the development of the City's draft gu1del,nes and d,ovelop a tool tO a~s•st the City in rnit igat1ng VIV1T impacts of development. and tr;inspo1 tat1on pI oiects.

City of Baldwin Park Downtown Transit Oriented Development (TOD) Specific Plan; Baldwin Park, CA . Fer nancio servecJ as the technical lead fo1 the tI ansportat1cn evaluatron and parking man ageIrent plan for· a tr ans1t-orientcd development specific plan 11' downtown Baldwin Park To irnprnve access and circulation to the: Baldwin Par I< IV1etrolink Station, Fernando assessed thf, potential for modifications to adjacent roadways, 111clud1ng changE:-s to the lane conf1guratrons on-street parking locations, and sidewalks/bicycle facil1t1es. The parking management plan for th,;; s1wc1fic plan Is includ ing several parking management strategie~ to better utilize th,;; existing parking supply, and to adequately accornrnodate thF: future mix of land uses while rr•eeting the obiectives of the specific plan. The rnanagr,rnent plan included strategies such as adopting parking occupancy and turnover targets, incent1v1zIng shared par king for mixed used developme11l areas, 1mbund1eo parking arid rnoI·e 81 236
Attachment 2

MICHAEL SAHIMI, AICP I SENIOR PLANNER

EDUCATION
• MURP, Tr anspor tat1on
0 oi1cy and Planning.

University of Calrfornra, Los
Angeles
• BA, Urban Studies
University of Cal1tornra,
Ir vine
■ BA, Crim1nologv. Law. and
Society, Un rvers 1ty of
California. Irvine

YEARS OF EXPERIENCE
8 CERTIFICATION
• Arner ican Institute of
ler tifred Planners

AFFILIATIONS
• Amer rcan Planning
Assocrat1on (APA), Member
Michael is an experienced transportc1l1on planner with expertise in traffic operations, environmental analysis, t1·ave! den,and rnodel,ng and forr:cast1ng, crrculat1on studies, and park 1ng studieo He is also involved 1n active transportation and transit planning. M1chaf?I works with ArcGIS, Cube, Trans( AD, Synchm, and Tranplan transportation software. Hrs worl-. has included coordination with several ;;gene res in Southern Cal1forn1a, including the San Bernardino County Tramportation Authority and the Orange County rransportar1on Authority

PROJECT EXPERIENCE
City of Anaheim Circulation Element Update; Anaheim, CA. l<ittelson rs prf:'paring dn upd~,le to the Ci1culot1on [lemE::nt of thf-' (Jer,;c,1al f'l,rn which will outline the futt.:1 e transportation network, goals and pol1c1r:s for the City for lhe next 10 vears. For J11s effon f. rttr:lson 1s cS~E:·S'. I11g eY.1sti11g dlld fu,J1 e cond1t1ons, dPterrn1nr11g how new rlPveloprnent potenl1al could affrct transportation cond1t1on,. Fron1 this il'.,Sessrne11t. f,ittelson will identify citywid0 roadwoy improvements to nw1Irn1zP congestion. le 1ttel,on rs also devPlop1ng new goal:, and polrc1>cs to plan for future mobrl1ty servrce5, 1nclud1r;g ,hared-ride vehicles, rn1cro-n1c,brl1ty, mrcro-tron'.,rt active r1ansportat1on connec.ted/autonornous vehicles, and lac.al tr an'.>1t. /.1, deputy pr OJf.Ct manager, Michael has r:001 d1nated thr: prr!parat1on of public outreach rnaterrals and rs currently devc:lop1ng rnult1rnodal I econ1me11dJt1ons.

Cityof Lake Forest General Plan Update; Lake Forest, CA. Kittelson conducted a transportation analysis for the Lake For est California, (Jenera I Plan Update a'ld Environmental Impact Report (EIR) document a, well as pr ov1di11g rnpcrt on the Gener al Plan ·s tr anspo1·tation pol icies and obJectives. M ichcJE::l's role included e:,arn1ning existing transportation conditions to establi:,h a baselinf? and understand the City's transportation needs assrstrng in Incorporat1ng land use alternative~ into the City's travel dernand model, and preparing a transportation analysis to a:;sess v,,hrc\e mrles traveled (VMT) and level of service (LOS) cond1tru11s for the EIR. Michael also led ihe effort to prepare mobility-related goals ;:ind polrcres for the Generc1I Pl;:in document.

Santa Ana Citywide Active Transportation Plan; Santa Ana, CA. Kittelson assisted 1n the update ro the Ac.trve Transportc1t1on Plan for the City of 'ianta Ana. The vIs1on of the project 'Na, to develop a pr iorrt12ed 11st of bikeway network and pedestrian focus areas, analyze costs and alternatives for· priority proiect:,, and pr ovrde designs thcit wot rid make rt ea: 1e1 to walk and 11de a bicycle in r.he r:1tv. Michaei led the conceptual design prc;ces<: for four of the ATP', pr iorrty pr OJeets. Michael worked wrth Kittf?lson designers to ,ncorpo1 ate both brcycle and pedPstrian improvement, along roadwc1y segrner.t~ as well ;is 1'lter,ect1on'., and interchanges along U-e corridors to assist the City 1n futurE grdr·,t cipplications Michael ;iiso led the cieve!or,n1L>nt of cost e'S111ndtes for the C Ity s priority proJects
Cityof Glendale Land Use and Circulation Element Update/Transportation Impact Fee/SB 743; Glendale, CA. K1ttels0'1 is developing an updated circulation element fc,r the City of Glendale and updating rto c1tyw1de travel demand model As part of this effort, rntelson 1s preparing a VMT est1matIng tool !or the City and developing its updated ':-8 743-compliant transportation imr,ac.t study guidelines. lv1rchael rs developing the City s off-modei \/MT est1111at1ng tool, which will b1: used to streamline VMT assessments for new development prnJects in place of running the full travel demand model. Michael 1s also researching applicable and effective TDM rn1:asures for projec.ts in the City which will be incorpor;,ted into the VMTestimating tool. 82 237
Attachment 2
City of San Marcos General Plan Update and EIR; San Marcos, CA. K :rte Ison 1s developing the updated rnobiiity element for the City of San Marc. s General Plan Update As part of the Gene, al Plan Update effon, Micha1:I will be leading the developmem of SB 743-consistent VMT methodologies and thresholds, an off-m del VMT sp,eadsheet tool, and traffic study gu1del1nes foi· projects 1n the City Michael will be working with the City to determ1nr: whethe1 the City sfeould adopt OPR or San u1ego Association of Governments (Sftl\JDAG) recommendations or adopt C1ty-spec.ific rnetr 1cs, th1 esholds and uite, ia. In acld1t1on, Michael will be resF?arch1ng the effectiveness of vcn ,ouc TOM measures to ,rnplernent rn San Marcos TO m1t1gate VMT impacts of development and tr,rnsportat1on proJects
City of La Verne General Plan Update and Environmental Impact Report; La Verne, CA. K ttel'.,on devr:lopnJ the c.1rculation and rnobrlrty sect1on5 oi the Ger eral Pl;,n Update for· the City, 1nciud1rig rnobilrty-relatecl oolrries ard obwct1ves with respect to auto,nobile. ,:1Ct1ve t, anspor·rat1on, tr ansrt and frc;ght c.ircula•ion, and on- ond off-street pd1k111g. Michael helped to develop the P!an Update ;ind l:nv1ronmental Impact kepor t (FIR) for this proJec.t. c:rnd his role includeJ exarni111ng E:x1st,ng t1anspo1 tat1011 c.ond1t1ons to estabiish a baseline and u11de1 stand :he City's transpor tat1on need,, develop ing the Mob1lity flemf0 nt. and cissessrng th!? Gf:ne, al Plan update'~ transpor"t;it,on rmp;irts for t.he EIR. M1chciel also assisted with gathering and analyzing ex1:.t111g cond1t1ons d,Hil.

San Bernardino County General Plan Update and EIR; San Bernardino County, CA. Mich;iel a~s1sted with the update to the General Pl,m for the County c,f San Rernard1110 the largest county rn the nation. Hrs role included resea, chrng ex1st111g conditions 111 the Countv'-s unincorporated cornrnun1t1es to establish a basel111e for the update and preparing a rnerno d1scuss1ng tutu re rmprovernents, opportunit1ec, and constraints at the county level. Michael coordrnc1ted modeling efforts for the p, OJect and tested various land use scenarios for the County. Th1< involved nurr\lcruu~ socioeconorn,c. data n,od1f1c,itions and fuli model I uns of ',Bl AM through Tr;insCAD to ;issess the potential 1mplic.at1ons of different land use g,owth patterns. Mic.hael also led traffic data collection ef-foits across the county 111 suppor·t of thr: EIR. A'S part of this effort, Michael also prepared a guidance memorandum for the County to incorporate 'ienate Bill 743 (SB 74 3) ;ind vehicle mrlf?s tr;iveled (\lt1F) 11110 their transportation impact analysis gu1dPl1ne,.

City of Hayward Downtown Specific Plan; Hayward, CA. Kittelson provided transportation anaivsrs c;ipport to the City for rt: new Downtov-r, Speed 1c Plan. rh,s plan replaces six different, ov1:rl;i[Jp1ng pla!'n1ng and :on1ng documents adopted between 1987 and 200! Michael was the lead analy~t fo1 the traffic study, conducting an impact analysis on study a1ea 1nte1·sert1ons and other transport;it1on fac.il1t1es to be mitigated. This traffic crnd 1vs1s was doc.urne11ted 111 the to, n I of air ansportat1on ,rnp;ic.t study wh1c.h was inco1 po, ated rnto the full EIR. 83 238
De Novo P I a n n n g Group
------------------------■ ,\ 1. .,11J list• Pl.1 n 11 111 g 11 ,·s,g n . . 111d 1-: 11\'ll'O ll lll t:lll.l l r ,r m 239
Attachment 2
Agreement No. 24-70 - De Novo Planning
Group
Final Audit Report
Created:

By:

Status:

Transaction ID:
2024-10-14
Wendy Jung ([email protected])
Signed
CBJC HBCAABAA5ewQ_n EsmO 1 de-CqiZSg8NsZPHW1 fEm3
2024-10-15
"Agreement No. 24-70 - De Novo Planning Group" History
~ Document created by Wendy Jung ([email protected]) 2024-10-14 - 9:40:31 PM GMT
( • Document emailed to Amanda Tropiano ([email protected]) for signature 2024-10-14 • 9:40:55 PM GMT
~ Email viewed by Amanda Tropiano ([email protected]) 2024-10-14 • 9:49:30 PM GMT
6-0 Document e-signed by Amanda Tropiano ([email protected]) Signature Date: 2024-10-15 - 8:19:23 PM GMT - Time Source: server 0 Agr·eement completed.
2024-10-15 - 819:23 PM GMT
II Adobe Acrobat Sign
85 240

← All documents from this meeting