1 Peters Canyon Rd., Ste.130, Irvine, CA 92606 | tel. 949.387.8500 | fax. 949.387.0800 | www.idsgi.com Mr. Christian Sanford Submitted Via Email: [email protected] Project Manager
City of Laguna Beach
601 N. Ross Street,4th Floor
Santa Ana, CA 92701
Subject: Expanded Architectural and Engineering Design Services Laguna Beach Library Interior Improvements
On-Call Agreement No. 23-89
Dear Mr. Sanford:

IDS is pleased to submit our professional services proposal for the renovation and interior improvements of the Laguna Beach Library. IDS proposes to complete A/E design services for permit-ready construction.

In addition to design services, we propose providing construction administration support for the renovation of the Laguna Beach Library building. The following architectural and engineering services will be completed in coordination with and approval by the City of Laguna Beach and Stakeholders as required.

This work is proposed as an additional service to current minor interior renovation project.

Proposed Additional Improvements for ASR #1
The scope of work includes the following:
 Modernize the interior and layout of the library to align with best practice library function and services provided to the community.
- Improve the interface between library staff and patrons including providing staff visual control of the space.
- Add dedicated teen and study areas as space allows.
- Create flexible Program Area improvements.
- Maintain size of collection with the guidance of Library Stakeholders.

EXISTING CONDITIONS PHOTOGRAPHS
Attachment 1
4 February 12, 2026
Laguna Beach Library Interior Renovation-Revised Scope
A/E Services

Page 2 ends

 Provide energy and daylight efficiency improvements to reduce operating costs and improve user experience.
- Modify interior ductwork/air distribution.
- Replace existing light fixtures with energy efficient LED fixtures.  Confirm accessible Paths of Travel complies with the California Building Code (CBC). - 2025 Triannual Code cycle and make changes for compliance.  Confirm structure complies with the California Building Code (CBC) Seismic. - 2025 Triannual Code cycle and make changes for compliance. - POT includes path from public way to the building entry and accessible parking.  Update and/or relocate restrooms, fixtures and finishes to coordinate with overall building modifications and comply with the California Building Code (CBC).

Project Approach
To advance the project objectives IDS will provide professional architectural and engineering services as described in the following workplan.

A. Programming & Conceptual Design (2 Months)
IDS will perform the following tasks for coordination with and approval by the City and its Stakeholders.  Review record drawings provided by Client.
 Review and assess Condition Assessment Report as provided by the Client.  On site project kick-off meeting to review stakeholder objectives and gather information.  A LiDAR scan of the area of the work will be completed by the IDS staff for later conversion to the Revit model of the existing building.
 Fine tune the preferred space plan in coordination with project Stakeholders.  Electrical and Mechanical team will perform preliminary equipment and related load calculations.  Structural engineer to review implications of Conceptual Design building modifications.  Provide Conceptual level ROM for preferred space plan.  Incorporate Client team comments and obtain approval of one Conceptual Space Plan version.

B. ASCE Tier 41 Seismic Evaluation (2 Months concurrent with above phase) The library is a mostly wood framed one-story structure that is supported partially at grade and partially by a one level concrete parking structure facing the downhill side. Limited as-built structural drawings are available. IDS will assess the structural seismic condition of the existing structure.  Review available structural construction drawings of the facility.  Conduct a site investigation to observe the existing condition of the structural elements, verify the building type, verify the vertical and lateral force resisting system and connections, and prepare a written report our observations.
 Prepare an ASCE 41 Tier 1 seismic checklist evaluation and summary report identifying potential seismic deficiencies and geologic seismic hazards. Develop a conceptual seismic retrofit for Life Safety criteria to mitigate the identified seismic deficiencies.  Include a rough order of magnitude cost estimate for the conceptual seismic retrofit.  Attend a meeting with City Stakeholders to present the report’s conclusions. 5 February 12, 2026
Laguna Beach Library Interior Renovation-Revised Scope
A/E Services

Page 3 ends

C. Schematic Design (SD) (2 Months)
We will advance the project design by refining the approved conceptual space plan to prepare schematic plans. This step will include:
 Coordinate the design across all project disciplines.  Complete a visual site survey.
- Limits of the survey will be project areas impacted by both CBC/ADA Path of Travel requirements.
 Identify Code compliance issues and prepare for the initial code review summary.  Present schematic design package to Stakeholder team for review and approval.  Incorporate Stakeholder comments received and with approval, proceed to Design Development D. Design Development (DD) (2 Months)
Based on the approved SD set, the IDS design team will:
 Develop detailed floor plans, elevations, and sections.  Begin coordination of standard or modified finish materials palette.  Coordinate fully with all engineering disciplines.
 Prepare updated cost estimate.
 Present Design Development package for Stakeholder approval prior to proceeding with Construction Documents phase.

E. Construction Documents (CD) (6 Months)
The IDS design team will:
 Prepare complete construction drawings and specifications.  Provide demolition, architectural, MEP plans.
 Update ROM cost estimate at 90% CDs.
 Ensure documents are code-compliant and permit-ready.  Review document set with Stakeholder team for approval to submit to Plan Check  Coordinate QA/QC reviews prior to submission.
 Respond to plan check comments and revise documents as required.  Coordinate with Jurisdictions Having Authority and assist in obtaining approvals.

F. Bid Support
IDS design team will:
 Attend one pre-bid meeting if required.
 Respond to design related questions from City’s bidders within 7 days.  Provide Bid Addenda if required in response to questions during bidding. 6 February 12, 2026
Laguna Beach Library Interior Renovation-Revised Scope
A/E Services

Page 4 ends

Deliverables
 Space planning concept diagrams (PDF)
 ASCE 41 Tier 1 Seismic Checklist and summary (PDF)
 Schematic design package (PDF)
 Design development package (PDF)
 Permit-ready construction documents (PDF)
 Specifications, division 01 sections provided by City (PDF)  Two Interior Renderings
Assumptions and Limitations/Exclusions
The scope of services is limited to the specific, explicit scope statements set forth above. There are no scope items that may reasonably be assumed as implicitly included with this scope of services. This listing serves only to help clarify the proposed scope of services and may not be considered a complete listing.

General:
 Change of use is not anticipated.
 The project will be subject to the current California Building Code (CBC), Mechanical (CMC), Plumbing (CPC), and Electrical (CEC) – the proposal anticipates that approved plans will comply with the 2025 code cycle.
 OCPW will provide access and, if required, associated equipment (e.g., ladders) to IDS for field surveys.
 It is assumed that the entire project will be addressed as a single construction phase.  The building is sprinklered. Necessary modification to fire sprinkler or fire alarm design will be provided as a deferred submittal by the General Contractor’s qualified subcontractor.  Client to provide water intrusion test results. Deficiencies identified within the area of the standing seam metal roof beyond the original scope of this project can be addressed as an additional service.  Plan check submittal and permit fees are not included in our fee.  Additional design work due to Value Engineering/Peer Review is excluded.  Remedial permit approvals for work previously performed and for which there is no record of a permit are excluded.
 Testing for the presence of hazardous materials of any kind and mitigation requirements for the same is not included.
 Construction Administration services are excluded from this contract.

Civil:
 As Built Records of the existing utilities on site will be provided by the Owner.  Utility Locating and Potholing is not proposed.
 Water and Sewer utility work will not be required and therefore is not proposed.  Resolution of site drainage issues is not proposed as part of this scope.  Excludes stormwater reports and low impact devices as improvements are anticipated to be under 5,000 SF.
 Scope is limited to minor modifications to existing ADA parking as deemed necessary in previous scope.
7 February 12, 2026
Laguna Beach Library Interior Renovation-Revised Scope
A/E Services

Page 5 ends

Structural:
 Existing structural conditions will be assessed and may warrant a detailed structural systems evaluation and will be the basis for additional services.  Based on the adequacy of information gathered for the existing structure, it may be necessary for IDS to make judgements as to the details of existing construction. Additionally, IDS will depend on the accuracy of record drawings in terms of depicting as-built construction. In this regard, it may be found during construction that IDS’s assumptions, and/or the record drawing information, do not match actual as-built conditions. Such conditions are not foreseeable and shall be considered as the basis for additional services to the extent that additional engineering time is required to deal with such unforeseen conditions.
 Assumed the existing floor structure will support the load of the new library shelving and additional changes in walls and furnishings.
 Structural calculations as required by the jurisdiction having authority for fastening library shelving to building walls and slab will be provided by the vendor as a deferred submittal.  Testing of existing connections or building elements is excluded.  Development of as-built drawings is excluded.
 Seismic retrofit construction drawings and details are excluded.  Public outreach or City Council presentations are excluded.

Mechanical:
 HVAC Pre-readings are not included.
 Pre-construction survey is not included.
 Commissioning is not included.

Plumbing:
 Fire protection design is not included.

Electrical:
 Electrical service upgrade and any coordination with SCE is excluded. This proposal assumes that the main service entrance conduit and conductors will remain.  Load readings, if necessary, by Owner.
 Upgrades to low voltage systems (Fire Alarm, Clock, etc.) are not included.  30-day data recording of electrical equipment is excluded.

Landscape:
 It is assumed that Landscape scope is not necessary for this project. 8 February 12, 2026
Laguna Beach Library Interior Renovation-Revised Scope
A/E Services

Page 6 ends

Proposed Fee
IDS Group, Inc. proposes to provide the services identified in the scope of work above on a fixed fee basis of $451,597.

The above fee includes Architectural, Mechanical, Electrical, Plumbing, Structural and Civil engineering services.

The breakdown of the fee estimate for each task is shown in Attachment A. Additional work may be provided upon your approval on a time-and-materials basis per our On-Call Services Rate Schedule shown in Attachment B. Preliminary schedule show in Attachment C We appreciate the opportunity to work with you on this project. Please do not hesitate to call us if you have any questions regarding the proposed scope of work, services, or fee, or require further information regarding this proposal.

Sincerely,
Said Hilmy
Said Hilmy, Ph.D., S.E., LEED AP
Principal
cc: John Silber - Principal
Shelley Sivak – Senior Associate
9 February 12, 2026
Laguna Beach Library Interior Renovation-Revised Scope
A/E Services

Page 7 ends

Attachment A
Fee Breakdown
Laguna Beach Library Rev 2/12/2026
Staff Allocations per Discipline: Support Services Role/Classifications: Hours IDS Fees Principal Senior PM Senior Architect (RA) Designer Arch. Arch Job Capt. Principal Senior PM Senior Engineer CAD Drafting Principal Senior Engineer Project Engineer CAD Drafting Principal Senior Engineer Project Engineer Engineer CAD Drafting Principal Senior Engineer Project Engineer CAD Drafting Senior Cost Estimator Spec Writer
Hourly Rate: $ 222 $ 197 $ 171 $ 143 $ Hrs Fees 119 $ 222 $ 197 $ 171 $ Hrs Fees 107 $ 222 $ 171 $ 158 $ Hrs Fees 107 $ 222 $ 171 $ 158 $ 143 $ Hrs Fees 107 $ 222 $ 171 $ 158 $ Hrs Fees 107 $ 158 Hrs Fees Task A - Programming & Conceptual Design 378 $56,350 8 48 12 136 120 $47,012 0 4 22 0 $4,550 0 18 0 0 $3,078 0 10 0 0 0 $1,710 0 0 0 0 $0 0 0 $0 $0 Programming & Conceptual Design 356 $52,708 8 44 12 128 120 312 $45,080 4 16 20 $3,524 16 16 $2,736 8 8 $1,368 0 $0 0 $0 Conceptual ROM Cost Estimate 22 $3,642 4 8 12 $1,932 6 6 $1,026 2 2 $342 2 2 $342 0 $0 0 $0 Task B - ASCE Tier 41 42 $8,618 0 2 2 0 0 $1,130 2 16 12 8 $7,488 0 0 0 0 $0 0 0 0 0 0 $0 0 0 0 0 $0 0 0 $0 $0 Review record drawings and visit site 9 $1,583 0 $0 0.5 4 4 9 $1,583 0 $0 0 $0 0 $0 0 $0 Prepare ASCE 41 Tier 1 w/retrofit plan 34 $5,657 2 2 4 $736 1.5 12 8 8 30 $4,921 0 $0 0 $0 0 $0 0 $0 ROM coordination 2 $368 0 $0 1 1 2 $368 0 $0 0 $0 0 $0 0 $0 City review meeting 5 $1,010 2 2 $394 1 2 3 $616 0 $0 0 $0 0 $0 0 $0 Task C - Schematic Design (25%) 2,441 $65,353 8 24 44 120 100 $43,088 0 8 14 30 $7,180 0 8 16 20 $6,036 0 8 20 0 16 $6,240 0 4 6 11 $2,809 0 0 $0 $2,200 Schematic Design 457 $65,353 8 24 44 120 100 296 $43,088 8 14 30 52 $7,180 8 16 20 44 $6,036 8 20 16 44 $6,240 4 6 11 21 $2,809 0 $0 $ 2,200.00 Task D - Design Development (50%) 992 $142,346 8 64 48 204 220 $77,944 2 12 52 48 $16,836 1 38 40 80 $21,600 1 32 40 0 32 $15,438 2 12 0 16 $4,208 40 0 $6,320 $4,400 Design Development 934 $132,956 8 60 48 200 220 536 $76,584 2 12 48 48 110 $16,152 1 36 40 80 157 $21,258 1 30 40 32 103 $15,096 2 10 16 28 $3,866 0 $0 $ 4,400.00 Update ROM 58 $9,390 4 4 8 $1,360 4 4 $684 2 2 $342 2 2 $342 2 2 $342 40 40 $6,320 Task E - Construction Documents 1,132 $159,120 12 48 48 254 240 $85,210 2 0 46 80 $16,870 1 42 44 78 $22,702 1 50 62 0 64 $25,416 2 10 12 16 $5,762 0 $3,160 $5,500 Construction Documents 1,096 $153,232 12 44 48 250 240 594 $83,850 2 44 80 126 $16,528 1 40 44 78 163 $22,360 1 48 62 64 175 $25,074 2 8 12 16 38 $5,420 0 $0 $ 5,500.00 Update ROM 36 $5,888 4 4 8 $1,360 2 2 $342 2 2 $342 2 2 $342 2 2 $342 20 20 $3,160 Task F - Bid Support 46 $7,710 4 12 0 24 0 $6,684 0 0 2 0 $342 0 2 0 0 $342 0 2 0 0 0 $342 0 0 0 0 $0 0 0 $0 $0 Bid Support 46 $7,710 4 12 24 40 $6,684 2 2 $342 2 2 $342 2 2 $342 0 $0 0 $0 TOTAL - Hours 2,511 40 199 154 738 680 1,812 7 42 149 166 365 2 108 100 178 388 2 102 122 0 112 338 4 26 18 43 91 0 60 Total Fees $451,597 $261,068 $53,266 $53,758 $49,146 $12,779 $9,480 $12,100 TOTAL Subtotal Subtotal Architecture Structural Electrical Mechanical/ Plumbing Civil Precon Subtotal Subtotal Subtotal Subtotal
10 February 12, 2026
Laguna Beach Library Interior Renovation-Revised Scope
A/E Services

Page 8 ends

Attachment B
11 February 12, 2026
Laguna Beach Library Interior Renovation-Revised Scope
A/E Services

Page 9 ends

Attachment C
Phase Key AcƟviƟes EsƟmated DuraƟon
Pre-Design/Concept Design Stakeholder engagement, needs assessment, iniƟal cost esƟmaƟng, Planning
Diagrams, ASCE 41 Tier 1
2 Months
SchemaƟc Design Architectural and engineering scoping,
sustainable soluƟons evaluaƟon, value
engineering, outline specificaƟons
2 Months
Design Development Building Systems Development, detailed specificaƟons development
2 Months
ConstrucƟon Documents PreparaƟon of detailed plans, MEP and civil coordinaƟon, code compliance review,
construcƟon specificaƟons
4 Months
Bidding & Permiƫng Contractor selecƟon, permit applicaƟons, project scheduling
2 Months
ConstrucƟon Library will be closed to implement focused construcƟon schedule.
8-12 Months