1 Arboricultural Construction Monitoring Form
Date of Report April 3, 2026
Time In 06:22
Time Out 15:30
Monitor Name [email protected]
Tree ID U
Description of Activities Performed
or Observed
Air spade excavation
Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
within the TPZ?
Yes
Explanation Root collar excavation
Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
No
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
No
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
No
Explanation Removed for air spade and project entrance
Site Photos
Attachment 1
12 2
Photo:

Photo Location:

Photo Description:

Site Photos
13 3
Photo:

Photo Location:

Photo Description: Ficus roots girdling Eucalyptus trunk and roots Site Photos
14 4
Photo:

Photo Location:

Photo Description: Ficus root
Site Photos
15 5
Photo:

Photo Location:

Photo Description:

Site Photos
16 6
Photo:

Photo Location:

Photo Description: Concrete under tree
Site Photos
17 7
Photo:

Photo Location:

Photo Description: Concrete under tree
Site Photos
18 8
Photo:

Photo Location:

Photo Description: Concrete under tree
Site Photos
19 9
Photo:

Photo Location:

Photo Description: Crew digging out dirt to locate concrete under tree on south side Site Photos
20 10
Photo:

Photo Location:

Photo Description:

Site Photos
21 11
Photo:

Photo Location:

Photo Description:

Site Photos
22 12
Photo:

Photo Location:

Photo Description: Concrete under tree on north side
23 13
Monitoring Notes:

Concrete was exposed under the tree on the north and southwest side. 1-2 roots were discovered on the south side of trunk at about 5- below top of grade. Suspected r
inches found. The tree s visible roots are circling and girdling trunk.

Additionally, ficus roots were found to be girdling trunk. No eucalyptus roots extending towards street were exposed. One large ficus root was exposed. Tree is recommended for removal due to the lack of structural roots observed within the first foot of soil during the air spading and within the excavation limits of the stormwater infrastructure on the west and north side of the tree; the suspected shallow rooting depth, the severe degree of lean; poor health and project impacts. Final grade surrounding the tree is anticipated to be approximately 8 lower than current surface.

Arboricultural Construction Monitoring Form
Date of Report April 3, 2026
Time In 08:21
Time Out 15:30
Monitor Name [email protected]
Tree ID D
Description of Activities Performed
or Observed
Air spade excavation
Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
within the TPZ?
Yes
Explanation Air spade excavation and hand digging around root collar Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
No
Were any materials staged within
the TPZ?
No
24 14
Was there any pooling or ponding
water present in the TPZ?
No
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
Yes
Explanation
Site Photos
Photo:

Photo Location:

Photo Description:

Site Photos
25 15
Photo:

Photo Location:

Photo Description:

Site Photos
26 16
Photo:

Photo Location:

Photo Description:

Site Photos
27 17
Photo:

Photo Location:

Photo Description:

Site Photos
28 18
Photo:

Photo Location:

Photo Description:

Site Photos
29 19
Photo:

Photo Location:

Photo Description:

Site Photos
30 20
Photo:

Photo Location:

Photo Description:

Site Photos
31 21
Photo:

Photo Location:

Photo Description:

Site Photos
32 22
Photo:

Photo Location:

Photo Description:
33 23
Monitoring Notes:

Tree has large structural roots on the north side that have grown over the root appears to be a severed root on the north side of the tree. An approximately 2 inch root has been severed in the past, and this root is severely decayed; the wood is soft and disintegrating. Tree is recommended for removal due to root guard proximity to trunk, suspected shallow rooting depth, declining health and impacts to roots requiring the removal of 30% of the root volume within the TPZ. The proposed finished grade of the project would be approximately 4 lower than existing.

Arboricultural Construction Monitoring Form
Date of Report April 3, 2026
Time In 08:26
Time Out 15:30
Monitor Name [email protected]
Tree ID G
Description of Activities Performed
or Observed
Air spade excavation
Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
within the TPZ?
Yes
Explanation Air spade and hand digging excavation around root collar Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
No
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
No
Were any roots 4" or larger cut
within the TPZ?
No
34 24
Were TPZs installed according to
City Guidelines?
Yes
Explanation
Site Photos
Photo:
35 25
Photo Location:

Photo Description:

Site Photos
36 26
Photo:
37 28
Photo:
38 30
Photo:
39 31
Photo Location:

Photo Description: Trunk/root collar girdled by old hardscape Site Photos
40 32
Photo:
41 33
Photo Location:

Photo Description:

Monitoring Notes:

Tree has root barrier installed 7inches from trunk fully encompassing it. The trunk has been girdled by concrete most of the circumference of the trunk, over 80% of the trunk has been damaged by concrete. No structural roots were exposed. Tree is recommended for removal due to root barrier proximity to trunk, past damaged to lower trunk/root collar and project impacts that will result in the root collar being above grade. The final grade is expected to be 2 lower than existing sidewalk.

Arboricultural Construction Monitoring Form
Date of Report April 3, 2026
Time In 10:44
Time Out 15:30
Monitor Name [email protected]
Tree ID P
Description of Activities Performed
or Observed
Air spade excavation
Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
within the TPZ?
Yes
Explanation Root collar excavation
42 34
Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
No
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
No
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
Yes
Explanation
Site Photos
43 35
Photo:
44 37
Photo:
45 38
Photo Location:

Photo Description:

Site Photos
Photo:

Photo Location:

Photo Description:
46 39
Site Photos
Photo:

Photo Location:

Photo Description:

Site Photos
Photo:
47 40
Photo Location:

Photo Description:

Monitoring Notes:

Excavation was conducted via a shovel and with the air spade. Excavation occurred to approximately 20 inches below surface. Tree is fully encompassed by root barrier that is assumed to be 24 inches deep. Drainage pipes were placed on either side of the tree, and the tree has engulfed one of these pipes.

Minimal roots are observed on the outside of the root barrier. These roots are small, from less than half an inch in diameter, up to 1 inch. Roots are observed, though they are assumed to be originating from underneath the root barrier, or somewhere lower than the excavation occurred where the root barrier was broken. Finish grade is anticipated to be 2 inches lower than current. No structural roots would be impacted by this work. This tree is recommended for a removal due to the proximity of the root guard to the trunk, unknown structural root stability and lean.

Arboricultural Construction Monitoring Form
Date of Report April 3, 2026
Time In 12:40
Time Out 15:30
Monitor Name [email protected]
Tree ID E
Description of Activities Performed
or Observed
Air spade excavation
Daily Site Observation Checklist
48 41
Were there any grade changes or
excavations deeper than 4 inches
within the TPZ?
Yes
Explanation Air spading around root collar
Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
No
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
No
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
Yes
Explanation
Site Photos
49 42
Photo:

Photo Location:

Photo Description:

Site Photos
50 43
Photo:

Photo Location:

Photo Description:

Site Photos
51 44
Photo:

Photo Location:

Photo Description:

Site Photos
52 45
Photo:

Photo Location:

Photo Description: Second layer on concrete sidewalk below tree Site Photos
53 46
Photo:

Photo Location:

Photo Description:

Site Photos
54 47
Photo:

Photo Location:

Photo Description:

Site Photos
55 48
Photo:

Photo Location:

Photo Description:

Site Photos
56 49
Photo:

Photo Location:

Photo Description:

Site Photos
57 50
Photo:

Photo Location:

Photo Description:

Site Photos
58 51
Photo:

Photo Location:

Photo Description:

Site Photos
59 52
Photo:

Photo Location:

Photo Description:

Site Photos
60 53
Photo:

Photo Location:

Photo Description:

Site Photos
61 54
Photo:

Photo Location:

Photo Description:
62 55
Monitoring Notes:

Original layer of sidewalk beneath the surface level layer of sidewalk found approximately 10 inches below surface. Several larger roots have grown over root barrier. Root barrier was dug out by shovel to a depth of 24 inches. A few small roots under .25 in diameter were observed to be pushing out from below the root barrier. Tons of small fibrous roots growing over the root barrier in between sidewalk layers. Minimal structural roots observed. Two larger roots approximately 2 to 3 inches in diameter are observed on the north side of the tree. Tree is recommended for removal due to the proximity of root barrier to trunk as it encompasses the entire trunk, anticipated construction impacts, and lean. Final grade is anticipated to be 4 lower than existing grade. Arboricultural Construction Monitoring Form Date of Report April 3, 2026
Time In 12:55
Time Out 15:30
Monitor Name [email protected]
Tree ID Alessa
Description of Activities Performed
or Observed
Air spade excavation
Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
within the TPZ?
Yes
Explanation Root collar excavation
Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
Yes
Was the spill removed and
collected to an appropriate
container for proper disposal?
No
Explanation Open bag on concrete
63 56
Were any materials staged within
the TPZ?
Yes
Were the materials removed and
collected to an appropriate
container for proper disposal?
No
Explanation Open bag of concrete
Was there any pooling or ponding
water present in the TPZ?
No
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
Yes
Explanation
Site Photos
64 57
Photo:
65 58
Photo Location:

Photo Description:

Site Photos
Photo:

Photo Location:

Photo Description:
66 59
Site Photos
Photo:
67 61
Photo:
68 62
Photo Location:

Photo Description: Damaged and decayed root approximately 2 in diameter Site Photos
69 63
Photo:
70 64
Photo Location:

Photo Description:

Monitoring Notes:

Root barrier was found to be fully encompassing tree underneath second layer of sidewalk. Three large structural roots were observed to be growing over the root barrier approximately 2 to 5 inches in diameter. One root appears to have been severed and is rotting out. Drainage pipes have been placed in close proximity to tree, resulting in the tree engulfing one of these pipes. Large roots were observed on the north and west side of tree. Tree is recommended for removal due to root guard installation encompassing trunk, the proximity of the root guard to the trunk, the previously damaged root that is exhibiting signs of decay with no compartmentalization and anticipated project impacts that would result in the removal of 30% of the total root volume in the TPZ. Final grade is anticipated to be 3 lower than existing.

Arboricultural Construction Monitoring Form
Date of Report April 3, 2026
Time In 13:11
Time Out 15:30
Monitor Name [email protected]
Tree ID O
Description of Activities Performed
or Observed
Root collar excavation
Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
Yes
71 65
within the TPZ?
Explanation Root collar excavation
Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
No
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
No
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
Yes
Explanation
Site Photos
72 66
Photo:
73 68
Photo:
74 70
Photo:
75 72
Photo:
76 74
Photo:
77 75
Photo Location:

Photo Description:

Monitoring Notes:

Root collar excavation was conducted with shovels to a depth of approximately 13 inches below the surface. This exposed several large structural roots that range from 1 to 15 inches in diameter. The large buttress root measuring 15 inches is on the south side of the tree, extending towards the building. This is at surface level. Root guard was exposed approximately 13 inches below the surface. All of the large structural roots visible are growing over the root barrier.

A drainage pipe was installed on the east side of the tree. The tree trunk is growing into the drainage pipe. The tree is recommended for removal due to anticipated construction impacts requiring more than 30% removal of the root volume within the TPZ. The finish grade is anticipated to be 1 lower than existing.

Arboricultural Construction Monitoring Form
Date of Report April 3, 2026
Time In 08:55
Time Out 15:30
Monitor Name [email protected]
Tree ID I
Description of Activities Performed
or Observed
Root collar excavation
Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
Yes
78 76
within the TPZ?
Explanation Excavation hand digging
Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
No
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
No
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
Yes
Explanation
Site Photos
79 77
Photo:
80 78
Photo Location:

Photo Description:

Site Photos
Photo:

Photo Location:

Photo Description:
81 79
Site Photos
Photo:
82 81
Photo:
83 83
Photo:
84 85
Photo:
85 86
Photo Location:

Photo Description:

Site Photos
Photo:

Photo Location:

Photo Description:
86 87
Site Photos
Photo:

Photo Location:

Photo Description:

Site Photos
87 88
Photo:
88 89
Photo Location:

Photo Description:

Monitoring Notes:
growing over original sidewalk. (1)
face. Small feeder
roots were collected for pathogen sampling. The tree has been previously been recommended for removal based off of the poor structure, assumed root damage from past infrastructure development and repair, and current impacts to the CRZ. If the City retains this tree, final grade is anticipated to remain the same, and based on the findings of the exploratory excavation the proposed hardscape could be installed without cutting roots 4 or larger within the visible and currently exposed TPZ. Tree remains in poor health and structure and is exhibiting signs of decline similar to the failed Tree J. 89 1
Arboricultural Construction Monitoring Form
Date of Report April 13, 2026
Time In 07:11
Time Out 09:00
Monitor Name [email protected]
Tree ID H
Description of Activities Performed
or Observed
Air spading within the tpz. Removal of root mat and soil to expose structural roots and observe grade change on the tree.

Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
within the TPZ?
Yes
Explanation Exposed root and root barrier. Removed mortar and root mat.

Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
Yes
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
No
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
Yes
Explanation Rain
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
No
Explanation They were not up for this tree
90 2
Site Photos
Photo:

Photo Location:

Photo Description: Before air spading
91 3
Site Photos
Photo:

Photo Location:

Photo Description: Root barrier
92 4
Site Photos
Photo:

Photo Location:

Photo Description: Roots exposed between sidewalk
93 5
Site Photos
Photo:

Photo Location:

Photo Description: On west side of tree, root barrier is girdling the trunk 94 6
Site Photos
Photo:

Photo Location:

Photo Description:
95 7
Site Photos
Photo:

Photo Location:

Photo Description:

Site Photos
96 8
Photo:

Photo Location:

Photo Description:
97 9
Site Photos
Photo:

Photo Location:

Photo Description:

Monitoring Notes:

Root collar excavation was conducted with hand tools and air spade to a depth of approximately 12 inches below the surface. The second layer of concrete sidewalk was exposed on the east side of the tree. There was approximately 4- 6 between the second layer of sidewalk and the root barrier. This exposed several small feeder roots growing over the root barrier and where the root 98 10
barrier was broken. Also, one larger root that range was approximately 2 inches in diameter was exposed where the root barrier had failed on the south side of the tree. On the west side of the tree the root barrier was in contact with the trunk and the trunk had started to engulf the root barrier. No roots were visible at surface level on west side of tree. The tree is recommended for removal due to proximity of root guard to trunk, damage to trunk from root guard. The finish grade is anticipated to be 1 than existing.

Arboricultural Construction Monitoring Form
Date of Report April 13, 2026
Time In 07:17
Time Out 09:04
Monitor Name [email protected]
Tree ID Q
Description of Activities Performed
or Observed
Air spading
Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
within the TPZ?
No
Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
NA
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
NA
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
Yes
Explanation Rain
Were any roots 4" or larger cut
within the TPZ?
99 11
Were TPZs installed according to
City Guidelines?
Site Photos
Photo:

Photo Location:
100
12 Photo Description: Before root inspection
Site Photos
Photo:

Photo Location:
101
13 Photo Description: Level of depth to roots.

Site Photos
Photo:

Photo Location:
102
14 Photo Description:

Site Photos
Photo:
103
15 Photo Location:

Photo Description: Confirmed root level is the same as current level. Grade change minimal.

Monitoring Notes:

Root collar excavation was conducted with hand tools and air spade to a depth of approximately 3 inches below the surface. This exposed root barrier that goes on all sides of the tree. Several small feeder roots were exposed where the root collar was found. The original potting soil was discovered near the suspected root collar. No structural roots were visible 3 below the surface, which is within the majority of the grading limits for hardscape installation. The finish grade is anticipated to remain the same. The tree is a candidate for preservation based off of the minimal anticipated project impacts and fair health with the assumption that no further damage occur to the tree from project related activities and the root barrier can be removed from 3 sides of the tree.

Arboricultural Construction Monitoring Form
Date of Report April 13, 2026
Time In 07:19
Time Out 09:00
Monitor Name [email protected]
Tree ID S
Description of Activities Performed
or Observed
Air spading. Exposure of root collar.

Daily Site Observation Checklist
Were there any grade changes or
excavations deeper than 4 inches
Yes
104
16 within the TPZ?
Explanation Removal of dirt to expose root collar and root guard.

Were all trenches, holes and steepwalled excavations within the TPZ inspected before backfilling?
NA
Did any spills of hazardous
materials occur within the TPZ? If
yes, then further question, was the
spill removed and collected to an
appropriate container for proper
disposal?
NA
Were any materials staged within
the TPZ?
No
Was there any pooling or ponding
water present in the TPZ?
Yes
Explanation Rain
Were any roots 4" or larger cut
within the TPZ?
No
Were TPZs installed according to
City Guidelines?
Yes
Explanation
Site Photos
105
17 Photo:

Photo Location:

Photo Description: Before air spading
Site Photos
106
18 Photo:

Photo Location:

Photo Description:

Site Photos
107
19 Photo:

Photo Location:

Photo Description: Root exposed
Site Photos
108
20 Photo:

Photo Location:

Photo Description: Trunk flare after mortar removal.

Site Photos
109
21 Photo:

Photo Location:

Photo Description:

Roots exposed.
110
22 Monitoring Notes:

Root collar excavation was conducted with hand tools and air spade to a depth of approximately 10 inches below the surface. Additionally, bricks and mortar were removed that were previously abutting the trunk during the excavation work. No root barrier was found. Several small feeder roots were exposed where the root collar is suspected. Two roots on the east side of the tree were exposed under the mortar approximately 3-4 below soil surface that range between 2-3 . These roots rather than extending out horizontally from the tree trunk have begun to circle the trunk. Mortar remains stuck in the trunk of the tree on multiple locations. The finish grade is anticipated to be 1.5 inches lower than existing. The tree has been previously been recommended for removal based off of the poor structure, lean, assumed root damage from past infrastructure development and repair, and current impacts to the CRZ. If the City retains this tree, based on the findings of the exploratory excavation the proposed hardscape could be installed without removing roots larger than 4 in diameter.