FINAL REPORT
UPDATED CITYWIDE
PAVEMENT MANAGEMENT PLAN
OC Go
2026-2033
Submitted to:
City of Laguna Beach, CA
May 28, 2026
Attachment 2
10 May 28, 2026
Mr. Tran Tran
Assistant City Engineer
CITY OF LAGUNA BEACH
505 Forest Avenue
Laguna Beach, CA 92651
Subject: City of Laguna Beach –OCTA Pavement Management Compliance Report 2026 Dear Mr. Tran:
As part of the 2026 Update of the Pavement Management Plan (PMP) for the City of Laguna Beach, Bucknam Infrastructure Group, Inc. is pleased to submit the PMP reporting required by the Orange County Transportation Authority (OCTA). This data/report will be submitted to OCTA as part of the City’s required biennial PMP prior to June 30, 2026.
The information contained in this report was used to develop the recommended improvement program for the pavement network. The report covers the following categories:
• Pavement Management Plan Certification
• Pavement Management Data Files (Included within the Laguna Beach MicroPAVER .e70 file) • Pavement Management Plan that includes the following:
• Average Pavement Conditions For Each Segment in the Network (PCI Report) The Pavement Condition Index report shows the present condition of each street in the pavement network (Arterials and Locals). In addition, the report shows the basic geometry of each street segment.
• Seven-year Projected PCI Under Existing Funding Levels This report identifies the projected PCI’s based on the local agencies current funding programs. This report details the PCI projects for the entire network, Master Plan of Arterial Highways (MPAH) roadways and Local streets.
• Seven-year Plan for Road Maintenance and Rehabilitation - Forecast Maintenance & Rehabilitation (FMR) Report
The FMR Report projects the street maintenance activities required for the next seven years, broken down to show maintenance levels for recommended streets. This includes all scheduled projects provided by the City for fiscal years 2026 through 2032. • Alternative Funding Levels
OCTA has requested two reports indicating the necessary funding to maintain the City’s current weighted average PCI as well as the necessary funding to improve the weighted average PCI by one PCI point over the next seven years. 11 • Backlog by Fiscal Year (re: unfunded restoration, rehabilitation and reconstruction) • Percentage of total network in each of the five condition categories based on centerline mileage
• Local Match Reduction Reporting
In order to be eligible for Local Match Reduction of 10%, the following must be submitted:
o Measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one PCI point.
o No reduction in the overall weighted (by area) average PCI in the MPAH or local street categories
- or –
o Have road pavement conditions, for the overall network, during the previous reporting period within the highest twenty (20%) of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”. GIS Digital Data
Quality Assurance / Quality Control (QA/QC) Plan
GIS Maps / Current Conditions
These reports will be submitted to the City of Laguna Beach as part of the biennial Pavement Management Plan that is due prior to June 30, 2026. These reports will be packaged in a way that it will be easy for staff to review.
All comments received from the City have been incorporated in the reports that follow. It has been a pleasure working with you and the City on updating your Pavement Management Plan. We look forward to the continued success of this project and future teamwork with City staff.
Sincerely,
Bucknam Infrastructure Group, Inc.
Peter J. Bucknam
Project Manager
Infrastructure Management – GIS Services
12 City of Laguna Beach, CA Page i
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
AGENCY SUBMITTAL TABLE OF CONTENTS
I. Pavement Management Plan Certification.............................................................................. 2 II. Executive Summary ................................................................................................................. 3 III. Background ...................................................................................................................... 4 IV. Current Pavement Conditions (PCI)......................................................................................... 7 V. Projected Pavement Conditions (PCI)...................................................................................... 8 VI. Alternative Funding Levels....................................................................................................... 9 a. Maintain Existing Average Network PCI ................................................................ 9 b. Improve Average Network PCI............................................................................... 9 VII. Current and Projected Backlog by Year of Pavement Maintenance Needs............................ 9 VIII. Centerline Mileage................................................................................................................. 10 IX. Percentage of Network in Each of Five Condition Categories Based on Centerline mileage 10 X. Reduction in M2 Local Match................................................................................................ 11 XI. Appendix A – Seven-Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level .............................................................................. 12 XII. Appendix B – Complete Street Listing Current Conditions.................................................... 13 XIII. Appendix C – GIS Digital Data ................................................................................................ 14 XIV. Appendix D – Quality Assurance / Quality Control Plan........................................................ 16 • Introduction ......................................................................................................... 16 • Objectives ............................................................................................................ 16 • Structure of QA/QC Plan...................................................................................... 16 • Condition Survey Procedures............................................................................... 17 • Accuracy Required for Data Collection................................................................ 18 • Random and Systematic Re-Inspections.............................................................. 18 • PCI Comparison with Past Surveys....................................................................... 19 • Inspector Qualifications and Experience ............................................................. 19 • Safety Procedures................................................................................................ 20 XV. Appendix E – Pavement Management Data Files............................................................. 21 XVI. Appendix F – GIS Maps – Current Conditions................................................................... 22 13 City of Laguna Beach, CA Page 1
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
CITY OF LAGUNA BEACH PAVEMENT MANAGEMENT PLAN
- part of -
COUNTYWIDE PAVEMENT MANAGEMENT PLAN GUIDELINES
(OCTA Guideline – April 2026)
Prepared by: Bucknam Infrastructure Group, Inc.
Submitted to OCTA: June 30, 2026
14 15
City of Laguna Beach, CA Page 3
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
II. EXECUTIVE SUMMARY
2026 UPDATE OF PAVEMENT MANAGEMENT PLAN (PMP)
As the City of Laguna Beach’s infrastructure continues to mature Public Works priorities such as street maintenance and redevelopment are key projects to City staff. With the City mostly built-out, wear and tear on the infrastructure will occur at an ever increasing rate. Pavement aging through annual weathering, dynamic topology, and increased usage, compounded with the increased cost of performing maintenance and rehabilitation, add to the yearly operational budget of the pavement network. System sustainability can only be achieved through proactive scheduling and the implementation of cost-efficient pavement applications.
Over the past several years the City has made proactive efforts to improve its overall condition status as well as greatly reduced its deferred maintenance burdens. The City’s overall weighted PCI is 87.4, that is now above the OCTA M2 Local Match Reduction threshold of 75 PCI and above the Orange County PCI average of 79. The optimal goal for the City is to reach the industry standard PCI range that is between 82 to 85. Funding the Laguna Beach PMP over the next seven years will be manageable and achievable based on city management proactivity, frequent inspections, and biennial budgetary review.
In the upcoming years as the City continues to build upon this study through future inspections and maintenance work history, Laguna Beach pavement data will continue to provide reliable data to enhance the PMP through detailed Orange County Transportation Authority (OCTA) OC Go funding analysis, City specific budgetary reporting and level of service reporting.
The Laguna Beach PMP has been developed to assist City personnel by providing current data on the City’s street network and to develop cost-effective maintenance strategies to maintain a desirable level of pavement performance on a network scale, while optimizing the expenditure of limited fiscal resources.
The project consisted of analyzing the City’s 2024 dataset for quality and usability. In doing this, we were tasked to generate an updated Capital Improvement Program report that identified recommendations and deficiencies in the current operating and maintenance efforts put forth by the City.
We surveyed all designated arterial, collector (MPAH) and local routes this past spring to assist the City in being compliant with OCTA – OC Go April 2026 guidelines. Additionally, we updated the City’s unique Pavement Management – GIS layer that will continue to assist the City in analyzing pavement conditions and other attribute information through the use of ESRI ArcGIS.
Bucknam Infrastructure Group reviewed the City’s previous maintenance efforts and the proposed 2026- 27 proposed street improvements for pertinent pavement information in order to generate a CIP report that identified recommendations and opportunities for improvement in the current operating and maintenance efforts put forth by the City. The result of these work efforts is this report. 16 City of Laguna Beach, CA Page 4
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
III. BACKGROUND (CITY OF LAGUNA BEACH)
In late 1990, voters throughout Orange County approved a ½-cent sales tax for transportation improvements known as OC Go, formerly known as Measure M2. Funding for streets and roads are included within the sales tax and are distributed to locals agencies through both formula and a competitive method. In late 2006, the renewal of OC Go was approved by voters that would continue the ½-cent sales tax for thirty additional years, starting in 2011.
The primary of goal of this report is to comply with established guidelines from OCTA to ensure that field data collection and reporting efforts performed by outside consultants or local agency staff are consistent.
This is required in order that funding allocations can be reviewed and based on agency comparable pavement conditions. Specifically, our findings and recommendations provide Public Works administrators, managers and field personnel with:
* PMP reports consistent with OCTA OC Go guidelines
* the present condition status of the pavement network (arterial, collector, residential and industrial streets), as a whole and of any grouping or individual component within the City; * a ranked list of all streets, or segments of streets, by condition within the network; * rehabilitation/maintenance needs of each street segment by year; * an optimized priority maintenance and rehabilitation program based on cost/benefit analysis and various levels of funding;
* optimum annual pavement expenditure levels for pavement maintenance for the next seven (7) years;
* prediction of the life-cycle performance of the City’s pavement network and each individual street section; and
* pavement condition data and analysis presented in GIS through MyRoads® and ESRI ArcGIS Pavement is a dynamic structure where deterioration is constantly occurring; thus the pavement management system needs to be updated on a regular basis to reflect these changes in pavement conditions, pavement maintenance histories, and maintenance strategies based upon budgetary constraints. In our approach to develop the City’s forecasted maintenance recommendations we worked with Laguna Beach Public Works/Engineering staff in identifying unit costs for all maintenance practices used on an annual basis. Currently, based upon the City’s maintenance practices and their associated unit costs, the total replacement value of the Laguna Beach pavement network is $202,464,500. This value clearly indicates that the City’s pavement network is the most valuable and essential asset to Laguna Beach. The City’s use of slurry seal, AC Overlay and R&R practices are typically applied at a five year, ten year and 25 year frequency respectively. These frequencies are typical but the City may see increases in deterioration rates due to environmental, load and high average daily traffic (ADT) volumes. For example, high ADT volumes along one of Laguna Beach’s arterial streets will increase deterioration rates for a previously applied AC Overlay compared to a small local street. These deterioration rates are monitored through frequent inspections and functional class deterioration analysis within the City’s PMP database. 17 City of Laguna Beach, CA Page 5
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
FINDINGS AND RECOMMENDATIONS
Through our assessment of historical maintenance performed within the City and through our discussions with City staff the overall conditional data found across the network clearly shows that the City has applied strong, preventative maintenance strategies over the past decade; one of the highest conditions in the County. Pavement management involves annual focus on preventative maintenance & rehabilitation practices; as PCI’s deteriorate due to high average daily traffic volumes, heavy rains, weathering and time, preventative applications (patching, crack filling, etc.) have limited benefits. More aggressive maintenance and rehabilitation applications, such as slurry seals and overlays, have to be used.
Compounded with the delay in increased/needed funding and high inflation rates PCI results will show continued decreases.
Our study has shown that key overlay projects will be needed over the next seven years to maintain the network’s high level of condition. Currently, the City’s two major streets networks (Arterial & Local) hold very high weighted PCI values; it is our recommendation that a proactive, common sense overlay program and a continued slurry seal program be scheduled over the next several fiscal years (with a solid focus on Locals). This will ensure that the citywide weighted PCI will sustain itself and allow for routine slurry seal maintenance to continue.
We have found and recommend the following detailed items which should be reviewed and considered for a proactive approach to the future management of the PMP:
ARTERIAL / COLLECTOR (MPAH) FINDINGS AND RECOMMENDATIONS The actual workload requirements identified indicate that the Arterial (MPAH) street network is currently in “very good” condition. To maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 9 to maintain a “very good” network weighted average PCI value.
Our MPAH findings for conditional data and recommendations for revenue expenditures are shown below:
• The MPAH network has a weighted PCI of 88.1;
• The MPAH network consists of 4.1 centerline miles and 878,731 SF of pavement; • Currently, 1% of the MPAH network (0.4 centerline miles) qualify for rehabilitation/reconstruction maintenance; 38% of the MPAH network (1.5 centerline miles) qualifies for slurry seal/stop gap maintenance;
• At a minimum, MPAH maintenance projects should focus on the maintaining the current PCI at a weighted average of 84 over the next 7 years;
o Maintain the MPAH revenues at an average annual level of $215,400/yr for the term of the CIP to generate the PCI identified on page 9;
• Develop a proactive fiscal and planned approach to identify MPAH overlay projects based on the deterioration modeling within MicroPAVER;
18 City of Laguna Beach, CA Page 6
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
o Demonstrated budget shown on page 9 is ample to sustain the MPAH weighted PCI of
87.7 after seven years, additionally, the citywide deferred backlog decreases from a level of $3.1 million to $1.6 after seven years; and
• Perform pavement inspections on the MPAH network every two years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for OC Go.
LOCAL FINDINGS AND RECOMMENDATIONS
The actual workload requirements identified indicate that the Local street network is currently in “very good” condition. To maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 9 to maintain a “very good” network weighted average PCI value. Our Local network findings for conditional data and recommendations for revenue expenditures are shown below:
• The Local network has a weighted PCI of 87.3;
• The Local network consists of 69.3 centerline miles and 11,201,487 SF of pavement; • Currently, 5% of the Local network (3.2 centerline miles) qualify for rehabilitation/reconstruction maintenance; 18% of the Local network (12.5 centerline miles) qualifies for slurry seal/stop gap maintenance;
• At a minimum, Local maintenance projects should focus on the maintaining the current PCI above a weighted average of 84 over the next 7 years;
o Maintain the Local revenues at an average annual level of $1,728,600/yr for the term of the CIP to generate the PCI identified on page 9;
• Develop a proactive fiscal and planned approach to identify local overlay projects based on the deterioration modeling within MicroPAVER;
o Demonstrated budget shown on page 9 is ample to increase the Local weighted PCI from
87.3 to 88.3 after seven years, additionally, the citywide deferred backlog decreases from a level of $3.1 million to $1.2 after seven years; and
• Perform pavement inspections on the Local network every four years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for OC Go. 19 City of Laguna Beach, CA Page 7
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
IV. CURRENT PAVEMENT CONDITIONS (PCI)
20 City of Laguna Beach, CA Page 8
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
V. PROJECTED PAVEMENT CONDITIONS (PCI) – CURRENT FUNDING 21 City of Laguna Beach, CA Page 9
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
VI. ALTERNATIVE FUNDING LEVELS
Maintain Existing Average Network PCI
Funding an additional $4 million over seven years sustains the PCI at 87.7.
Improve Average Network PCI
Funding an additional $5.8 million over seven years increases the PCI by one (1) points.
VII. CURRENT AND PROJECTED BACKLOG BY YEAR OF PAVEMENT
MAINTENANCE NEEDS
DEFERRED MAINTENANCE
Delaying repairs on streets where pavement conditions indicate a need generates deferred maintenance or “backlog”. Deferred maintenance is work that is postponed to a future budget cycle, or until funds are available. As maintenance is deferred, the opportunity to apply preventive, life extending pavement treatments is forfeited and the ultimate cost of rehabilitation multiplies (i.e. slurry seal costs to overlay costs). By using the City’s pavement maintenance applications and their associated unit costs, when a budgetary model is exercised within the PMP software the amount of deferred maintenance is calculated. Based upon the available budget applied to the model, deferred maintenance will increase or decrease. 22 City of Laguna Beach, CA Page 10
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
As maintenance is deferred, the opportunity to apply life extending preventive pavement applications is lost and the ultimate cost of rehabilitation multiplies.
In the case of Laguna Beach, the City’s actual budget will allow the deferred maintenance to increase on both the Arterial and Local networks.
VIII. CENTERLINE MILEAGE
IX. PERCENTAGE OF NETWORK IN EACH OF FIVE CONDITION CATEGORIES
BASED ON CENTERLINE MILES
23 City of Laguna Beach, CA Page 11
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
X. REDUCTION IN M2 LOCAL MATCH
A local agency match reduction of 10% of the eligible cost for projects submitted for consideration of funding through the M2 Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local agency either:
a. Shows measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one Pavement Condition Index (PCI) point with no reduction in the overall weighted (by area) average PCI in the Master Plan of Arterial Highways (MPAH) or local categories:
or
b. Have road pavement conditions during the previous reporting period, within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”.
Road conditions found through our 2026 PMP management study shows that the City is eligible for Local Match Reduction based on the current network weighted PCI of 87.4. Additionally, the City of Laguna Beach has demonstrated with the enclosed budget projection (page 8) that the City’s weighted average PCI (by area) remains above a PCI of 75 after the seven year program. 24 City of Laguna Beach, CA Page 12
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
XI. APPENDIX A – SEVEN YEAR ROAD MAINTENANCE AND REHABILITATION
PLAN BASED ON CURRENT OR EXPECTED FUNDING LEVEL
25 City of Laguna Beach, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2026-2033 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Maint. / Rehab Recommendations Total $ Arterial / Collector (MPAH)
2026-27 FORES 6130070 FOREST AV BEACH ST THIRD ST B AC 2 ~ 565 48 26,928 5/26/26 85 25 75 0 Type II Slurry Seal $18,580 2026-27 FORES 6130076 FOREST AV COAST HY BEACH ST C AC 1 ~ 626 48 27,585 5/26/26 87 21 37 42 Type II Slurry Seal $19,034 2026-27 FORES 6130089 FOREST AV THIRD ST BROADWAY B AC 2 ~ 556 48 30,180 5/26/26 72 36 38 26 Type II Slurry Seal $20,824 $58,438
2027-28 BLUEBIRD C 6180196 BLUEBIRD CANYON DR SUMMIT DR CRESS ST C AC 2 ~ 762 28 17,276 5/26/26 67 63 10 27 ARHM $99,164 2027-28 BLUEBIRD C 6180198 BLUEBIRD CANYON DR CRESS ST ORIOLE DR C AC 2 ~ 898 38 41,268 5/26/26 73 47 6 47 Type II Slurry Seal $29,713 $128,877
2028-29 GLENN 6180434 GLENNEYRE ST BROOKS ST THALIA ST B AC 4 ~ 1,109 54 60,935 5/26/26 68 84 14 2 ARHM $363,782 2028-29 GLENN 6180477 GLENNEYRE ST CALLIOPE ST BROOKS ST C AC 4 ~ 1,076 55 59,206 5/26/26 83 59 41 0 Type II Slurry Seal $44,405 2028-29 GLENN 6180500 GLENNEYRE ST BLUEBIRD CANYON RD CALLIOPE ST B AC 2 ~ 506 36 18,660 5/26/26 77 46 48 6 Type II Slurry Seal $13,995 $422,181
2029-30 GLENN 6180660 GLENNEYRE ST CENTER ST BLUEBIRD CANYON DR C AC 2 ~ 969 36 36,645 5/26/26 78 13 6 81 Type II Slurry Seal $28,583 $28,583
2030-31 GLENN 6180673 GLENNEYRE ST MOSS ST CENTER ST C AC 2 ~ 1,050 38 39,900 5/26/26 79 39 3 58 Type II Slurry Seal $32,319 $32,319
2031-32 GLENN 6370744 GLENNEYRE ST MOSS ST UPLAND RD C AC 4 ~ 1,050 26 27,300 5/26/26 76 35 0 65 Type II Slurry Seal $22,932 $22,932
2032-33 GLENN 6370745 GLENNEYRE ST UPLAND RD ALTA VISTA WY C AC 2 ~ 869 26 22,604 5/26/26 81 43 39 18 Type II Slurry Seal $19,665 $19,665
Locals
2026-27 ALEXANDER 6370641 ALEXANDER RD ASHTON DR END E AC 2 8 485 18 8,730 4/7/22 93 39 51 10 Preventive - Stop Gap $4,365 2026-27 ALTA VISTA 6370560 ALTA VISTA WAY QUEDA WY PALA WY C AC 2 8 242 16 3,871 4/8/22 92 0 100 0 Preventive - Stop Gap $1,936 2026-27 ALTA VISTA 6370569 ALTA VISTA WAY SOLANA WY END P AC 0 8 64 25 1,600 4/29/22 94 0 60 40 Preventive - Stop Gap $800 2026-27 ALTA VISTA 6370696 ALTA VISTA WAY NIDO WY LOMITA WY C AC 2 8 646 20 12,924 4/8/22 91 0 78 22 Preventive - Stop Gap $6,462 2026-27 ALTA VISTA 6370718 ALTA VISTA WAY LOMITA WY KILO WY C AC 2 8 807 20 16,140 4/8/22 89 0 70 30 Type II Slurry Seal $11,137 2026-27 ALTA VISTA 6370724 ALTA VISTA WAY ENCINA WY DUARTE WY C AC 2 8 136 20 2,720 2/15/22 95 0 100 0 Preventive - Stop Gap $1,360 2026-27 ALTA VISTA 6370726 ALTA VISTA WAY IRIS WY ENCINA WY C AC 2 8 86 20 1,725 2/15/22 93 0 100 0 Preventive - Stop Gap $862 2026-27 ALTA VISTA 6370759 ALTA VISTA WAY CORONA WY BONITA WY C AC 2 8 176 20 3,518 2/15/22 93 0 100 0 Preventive - Stop Gap $1,759 2026-27 ALTA VISTA 6370766 ALTA VISTA WAY FONTANA WY IRIS WY C AC 2 8 120 20 2,398 2/15/22 88 0 100 0 Type II Slurry Seal $1,654 2026-27 ALTA VISTA 6370768 ALTA VISTA WAY KILO WY FONTANA WY C AC 2 8 432 20 6,251 2/15/22 90 0 100 0 Preventive - Stop Gap $3,126 2026-27 ALTA VISTA 6370775 ALTA VISTA WAY DUARTE WY CORONA WY C AC 2 8 143 20 2,865 2/15/22 94 0 84 16 Preventive - Stop Gap $1,433 2026-27 ALTA VISTA 6370782 ALTA VISTA WAY GLENNEYRE ST QUEDA WY C AC 2 8 182 16 2,904 4/8/22 81 31 38 31 Type II Slurry Seal $2,004 2026-27 ALTA VISTA 6370783 ALTA VISTA WAY HIGHLAND RD GLENNEYRE ST C AC 2 8 110 18 1,975 4/8/22 88 43 57 0 Type II Slurry Seal $1,363 2026-27 ALTA VISTA 6370790 ALTA VISTA WAY PALA WY NIDO WY C AC 2 8 481 14 3,396 4/8/22 87 43 53 4 Type II Slurry Seal $2,343 2026-27 ASHTON DR 6370642 ASHTON DR ROUNSEVEL TE END E AC 2 8 294 18 4,235 4/7/22 86 20 76 4 Type II Slurry Seal $2,922 2026-27 BAYVIEW PL 6180180 BAYVIEW PL TEMPLE HILLS DR NORTH END E AC 2 8 826 18 16,317 4/6/22 85 62 36 2 Type II Slurry Seal $11,259 2026-27 BEACH ST 6130080 BEACH ST BROADWAY OCEAN AV E AC 4 4 271 48 13,029 4/7/22 93 0 100 0 Preventive - Stop Gap $6,515 2026-27 BEACH ST 6130082 BEACH ST OCEAN AV FOREST AV E AC 2 4 257 36 9,267 4/7/22 94 0 100 0 Preventive - Stop Gap $4,634 2026-27 BENT ST 6130104 BENT ST PARK AV END E AAC 2 4 385 46 17,710 4/13/22 100 0 0 0 Preventive - Stop Gap $8,855 2026-27 BONITA WY 6370711 BONITA WY END (W) END (E) E AC 2 8 305 25 8,550 2/15/22 95 0 100 0 Preventive - Stop Gap $4,275 2026-27 BROADWAY P 6130269 BROADWAY PL COAST HY BROADWAY E AC 2 4 926 16 14,823 4/7/22 69 58 29 13 1.5" Grind-Overlay $69,373 2026-27 BUENA VIST 6130179 BUENA VISTA WY CANYON VIEW DR NORTH END E AC 2 8 1,255 26 32,617 4/6/22 68 71 10 19 1.5" Grind-Overlay $152,648 2026-27 CANYON VIE 7000002 CANYON VIEW DR TEMPLE HILLS DR BUENA VISTA DR E AC 2 8 1,158 30 34,740 4/6/22 63 83 14 3 1.5" Grind-Overlay $162,583 2026-27 CANYON VIE 7000003 CANYON VIEW DR BUENA VISTA DR END E AC 0 8 741 30 22,230 4/6/22 78 56 32 12 Type II Slurry Seal $15,339 2026-27 CERRT 6180177 CERRTOS DR TERRACE WY EAST END E AC 2 8 390 34 13,249 4/6/22 84 59 39 2 Type II Slurry Seal $9,141 2026-27 CERRT 6180200 CERRTOS DR TEMPLE HILLS DR TERRACE WY E AC 2 8 428 34 14,562 4/6/22 76 50 44 6 Type II Slurry Seal $10,048 2026-27 CERRT 6180204 CERRTOS DR TERRACE WY SW TERRACE WY NE E AC 2 8 1,542 34 52,429 4/6/22 78 42 35 23 Type II Slurry Seal $36,176 2026-27 COAST VIEW 7000001 COAST VIEW DR TEMPLE HILLS DR END E AC 2 8 2,009 30 60,270 4/29/22 81 90 10 0 Type II Slurry Seal $41,586 2026-27 CORON WY 6370781 CORONA WY FONTANA WY END P AC 0 8 276 30 8,280 2/15/22 95 0 100 0 Preventive - Stop Gap $4,140 2026-27 DONNA 6130248 DONNA DR SAN REMO DR END E AC 2 8 142 22 3,130 4/6/22 81 59 41 0 Type II Slurry Seal $2,160 2026-27 DUART 6370776 DUARTE WY W END FONTANA WY E AC 2 8 308 26 7,999 4/8/22 98 0 52 48 Preventive - Stop Gap $4,000 2026-27 DUART 6370778 DUARTE WY FONTANA WY E END E AC 2 8 102 20 2,040 4/8/22 97 0 100 0 Preventive - Stop Gap $1,020 2026-27 DUMON 6370627 DUMOND DR OCEAN FRONT WARDS TE E AC 2 8 190 12 2,280 4/29/22 90 0 6 94 Preventive - Stop Gap $1,140 2026-27 DUMON 6370637 DUMOND DR WARDS TE MARION WY E AC 2 8 202 34 6,873 4/29/22 96 0 34 66 Preventive - Stop Gap $3,436 2026-27 DUMON 6370668 DUMOND DR MARION WY VICTORIA DR E AC 2 8 344 34 11,683 4/29/22 88 60 7 33 Type II Slurry Seal $8,061 2026-27 DUNNI 6180175 DUNNING DR TEMPLE HILLS DR NE END E AC 2 8 1,898 22 41,750 4/6/22 100 0 0 0 Preventive - Stop Gap $20,875 2026-27 ENCIN 6370725 ENCINA WY FONTANA WY END E AC 1 8 145 20 2,900 2/15/22 88 0 49 51 Type II Slurry Seal $2,001 2026-27 FONTA 6370563 FONTANA WY DUARTE WY CORONA WY E AC 2 8 125 30 3,762 2/15/22 95 0 100 0 Preventive - Stop Gap $1,881 2026-27 FONTA 6370757 FONTANA WY CORONA WY BONITA WY E AC 2 8 121 30 3,643 2/15/22 93 0 59 41 Preventive - Stop Gap $1,821 2026-27 FONTA 6370767 FONTANA WY ALTA VISTA WY ENCINA WY E AC 2 8 187 24 4,486 2/15/22 89 0 30 70 Type II Slurry Seal $3,095 2026-27 HERMO 6370769 HERMOSA WY IRIS WY N END E AC 1 8 120 18 2,160 4/8/22 71 0 81 19 1.5" Grind-Overlay $10,109 2026-27 HIGHL RD 6370708 HIGHLAND RD SOLANA WY END P AC 0 8 349 30 11,040 4/29/22 84 48 25 27 Type II Slurry Seal $7,618 2026-27 HIGHL WY 6370709 HIGHLAND WY HIGHLAND RD WY NYES PL E AC 2 8 475 22 10,441 4/29/22 84 60 29 11 Type II Slurry Seal $7,204 2026-27 HINKL 6370654 HINKLE PL COAST HY ROUNSEVEL TE E AC 2 8 429 24 5,500 4/7/22 74 46 36 18 Type II Slurry Seal $3,795 2026-27 IRIS 6370773 IRIS WY ALTA VISTA WY END E AC 2 8 405 22 9,000 4/8/22 95 0 69 31 Preventive - Stop Gap $4,500 2026-27 JUANI 6370694 JUANITA WY ALTA VISTA WY END E AC 2 8 578 26 15,028 2/15/22 84 0 26 74 Type II Slurry Seal $10,369 2026-27 KILO 6370695 KILO WY ALTA VISTA WY END E AC 2 8 578 22 12,716 4/8/22 95 0 82 18 Preventive - Stop Gap $6,358 2026-27 LOMA 6130117 LOMA TERR S END N END E AC 2 4 920 28 25,760 2/17/22 61 48 18 34 1.5" Grind-Overlay $120,557 2026-27 LOMA 6130119 LOMA TERR THIRD ST LOMA TE E AC 2 4 185 26 4,811 2/17/22 83 0 80 20 Type II Slurry Seal $3,320 2026-27 LOMIT 6370697 LOMITA WY ALTA VISTA WY END E AC 2 8 459 20 9,189 4/8/22 91 29 49 22 Preventive - Stop Gap $4,594 2026-27 MAR V 6180176 MAR VISTA AVE TERRACE WY NE END E AC 2 8 287 24 6,895 4/6/22 72 44 25 31 1.5" Grind-Overlay $32,267 2026-27 MARIO 6370705 MARION WY NW END DUMOND DR E AC 2 8 139 28 3,903 4/29/22 94 0 75 25 Preventive - Stop Gap $1,952 2026-27 MCAUL 6370722 MCAULAY PL VICTORIA DR COAST HY E AC 2 8 454 28 12,714 4/29/22 90 0 24 76 Preventive - Stop Gap $6,357 2026-27 MERMA 6130059 MERMAID ST THIRD ST LOMA TERR E AC 2 4 187 28 5,250 2/17/22 93 0 100 0 Preventive - Stop Gap $2,625 2026-27 MERMA 6130068 MERMAID ST GLENNEYRE ST THIRD ST E AC 2 4 602 34 20,468 2/17/22 79 0 55 45 Type II Slurry Seal $14,123 2026-27 NIDO 6370787 NIDO WY ALTA VISTA WY END E AC 2 8 715 26 16,172 4/8/22 83 67 13 20 Type II Slurry Seal $11,159
26 City of Laguna Beach, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2026-2033 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Maint. / Rehab Recommendations Total $ 2026-27 NYES 6370619 NYES PL END (S) COAST HWY C AC 2 8 315 30 9,450 4/8/22 84 55 29 16 Type II Slurry Seal $6,521 2026-27 NYES 6370621 NYES PL HIGHLAND RD BALBOA AV C AC 2 8 3,918 38 135,560 2/15/22 90 0 69 31 Preventive - Stop Gap $67,780 2026-27 NYES 6370669 NYES PL COAST HWY HIGHLAND WY C AC 2 8 215 30 6,450 4/8/22 88 36 64 0 Type II Slurry Seal $4,451 2026-27 OCEAN A 6130081 OCEAN AV BEACH ST THIRD ST P AC 0 4 801 42 33,642 4/8/22 70 74 26 0 1.5" Grind-Overlay $157,445 2026-27 OCEAN A 6130083 OCEAN AV COAST HY BEACH ST P AC 0 4 760 42 31,920 4/8/22 77 50 49 1 Type II Slurry Seal $22,025 2026-27 PALA 6370561 PALA WY ALTA VISTA WY AVENUE W E AC 1 8 363 14 5,083 4/8/22 84 0 86 14 Type II Slurry Seal $3,508 2026-27 PALA 6370698 PALA WY ALTA VISTA WY END E AC 1 8 221 14 3,094 4/8/22 94 0 88 12 Preventive - Stop Gap $1,547 2026-27 PALM 6130177 PALM DR TEMPLE HILLS DR NE END E AC 2 8 367 30 11,019 4/6/22 87 46 35 19 Type II Slurry Seal $7,603 2026-27 PARK 6180153 PARK AV COAST HY EAST END C AC 2 4 185 34 6,296 4/29/22 70 54 17 29 1.5" Grind-Overlay $29,465 2026-27 QUEDA 6370699 QUEDA WY ALTA VISTA WY W END E AC 2 8 475 20 9,501 4/8/22 93 0 51 49 Preventive - Stop Gap $4,750 2026-27 QUEDA 6370713 QUEDA WY ALTA VISTA WY E END E AC 2 8 263 26 6,846 4/8/22 97 0 68 32 Preventive - Stop Gap $3,423 2026-27 ROUNS 6370649 ROUNSEVEL TE ASHTON DR END E AC 2 8 760 30 10,031 4/7/22 80 0 75 25 Type II Slurry Seal $6,922 2026-27 SAN C 6370686 SAN CLEMENTE ST ALTA VISTA WY END E AC 2 8 359 18 4,626 4/8/22 95 0 100 0 Preventive - Stop Gap $2,313 2026-27 SAN R 6130239 SAN REMO DR TEMPLE HILLS DR SW TEMPLE HILLS DR NE E AC 2 8 1,336 24 32,056 4/6/22 77 69 31 0 Type II Slurry Seal $22,119 2026-27 SECON ST 6130064 SECOND ST MERMAID ST FOREST AV P AC 2 4 481 42 20,202 2/17/22 93 15 62 23 Preventive - Stop Gap $10,101 2026-27 SOLAN 6370555 SOLANA WY COAST HY ALTA VISTA WY E AC 2 8 706 26 18,355 4/8/22 84 46 28 26 Type II Slurry Seal $12,665 2026-27 SOLAN 6370710 SOLANA WY ALTA VISTA WY VICTORIA PL E AC 2 8 504 24 12,096 4/8/22 81 60 34 6 Type II Slurry Seal $8,346 2026-27 SUNSET TER 6370761 SUNSET TER COAST HWY VICTORIA DR P AC 0 8 737 30 22,110 4/29/22 81 45 12 43 Type II Slurry Seal $15,256 2026-27 TEMPL 6180274 TEMPLE HILLS DR DUNNING DR BAYVIEW PL C AC 2 8 1,290 26 33,540 4/6/22 89 30 65 5 Type II Slurry Seal $23,143 2026-27 TEMPL 6180276 TEMPLE HILLS DR THALIA ST DUNNING DR C AC 2 8 1,332 24 31,961 4/6/22 90 27 67 6 Preventive - Stop Gap $15,980 2026-27 TERRA 6180205 TERRACE WY CERRITOS DR S CERRITOS DR N P AC 2 8 1,939 29 56,231 4/6/22 81 51 45 4 Type II Slurry Seal $38,799 2026-27 TERRY 6370647 TERRY RD HINKLE PL W END E AC 2 8 458 28 10,920 4/7/22 85 48 37 15 Type II Slurry Seal $7,535 2026-27 TERRY 6370655 TERRY RD SE END HINKLE PL E AC 2 8 311 28 8,704 4/7/22 86 16 28 56 Type II Slurry Seal $6,006 2026-27 THIRD S 6130058 THIRD ST MERMAID ST FOREST AV P AC 2 4 731 40 29,240 2/11/22 75 0 21 79 Type II Slurry Seal $20,176 2026-27 THIRD S 6130061 THIRD ST PARK AV MERMAID ST P PCC 2 4 400 36 14,400 2/11/22 100 0 0 0 Preventive - Stop Gap $7,200 2026-27 THURS DR 6130187 THURSTON DR TEMPLE HILLS DR END P AC 2 8 808 30 24,240 4/6/22 73 66 19 15 Type II Slurry Seal $16,726 2026-27 VICTO 6370573 VICTORIA DR COAST HWY SUNSET TE E AC 2 8 1,028 26 26,738 4/29/22 89 34 22 44 Type II Slurry Seal $18,449 2026-27 VICTO 6370578 VICTORIA DR SUNSET TE NYES PL E AC 2 8 730 26 18,980 4/29/22 80 90 7 3 Type II Slurry Seal $13,096 2026-27 VICTO 7000000 VICTORIA DR HIGHLAND WY COAST HWY E AC 2 8 202 24 4,728 4/8/22 84 44 48 8 Type II Slurry Seal $3,262 2026-27 WARDS 6370701 WARDS TE NW END DUMOND DR E AC 2 8 271 24 6,507 4/29/22 92 0 7 93 Preventive - Stop Gap $3,253 2026-27 Y PL 6130025 Y PL LOMA TERR END E AC 1 4 236 22 5,192 4/8/22 69 59 20 21 1.5" Grind-Overlay $24,299 2026-27 Y PL 6130113 Y PL Y PL LOMA TERR E AC 1 4 174 18 3,137 4/8/22 80 58 38 4 Type II Slurry Seal $2,164 $1,462,819
2027-28 ACAPULCO 6180352 ACAPULCO ST CORTEZ AV CAPISTRANO AV E AC 2 9 430 20 8,600 2/15/22 95 0 100 0 Preventive - Stop Gap $4,472 2027-28 ACAPULCO 6180364 ACAPULCO ST ALISOS AV CORTEZ AV E AC 2 9 362 20 7,248 2/15/22 93 0 100 0 Preventive - Stop Gap $3,769 2027-28 ALISOS AV 6370589 ALISOS AV QUIVERA ST END E AC 2 9 335 20 6,700 2/15/22 94 0 83 17 Preventive - Stop Gap $3,484 2027-28 BAJA ST 6180545 BAJA ST CAPISTRANO AV END (N) E AC 2 9 660 25 16,500 2/15/22 75 73 25 2 Type II Slurry Seal $11,880 2027-28 BAJA ST 6180561 BAJA ST END (S) CAPISTRANO AV E AC 2 9 459 25 10,750 2/15/22 93 0 100 0 Preventive - Stop Gap $5,590 2027-28 BAJA ST 6180574 BAJA ST SUMMIT DR S END P AC 2 9 227 30 6,810 2/16/22 93 0 100 0 Preventive - Stop Gap $3,541 2027-28 BALBOA AV 6180318 BALBOA AV BARRACUDA WY CORTEZ AV C AC 2 9 502 36 14,764 2/15/22 91 0 100 0 Type II Slurry Seal $10,630 2027-28 BALBOA AV 6180378 BALBOA AV CORTEZ AV CAPISTRANO AV C AC 2 9 430 36 15,479 2/15/22 78 67 33 0 Type II Slurry Seal $11,145 2027-28 BALBOA AV 6180379 BALBOA AV CAPISTRANO AV DEL MAR AVE E AC 2 9 430 36 18,220 2/15/22 77 0 62 38 Type II Slurry Seal $13,118 2027-28 BALBOA AV 6370717 BALBOA AV NYES PL KENDAL DR C AC 2 9 493 36 17,748 2/15/22 86 0 100 0 Type II Slurry Seal $12,779 2027-28 BALBOA AV 6370735 BALBOA AV KENDAL DR BOLSANA DR C AC 2 9 1,056 36 38,011 2/15/22 84 0 68 32 Type II Slurry Seal $27,368 2027-28 BALBOA AV 6370764 BALBOA AV BOLSANA DR BARRACUDA WY C AC 2 9 303 36 10,913 2/15/22 87 40 60 0 Type II Slurry Seal $7,857 2027-28 BARRACUDA 6370689 BARRACUDA WY SOUTH END BALBOA AV E AC 2 9 640 32 24,864 4/29/22 78 41 54 5 Type II Slurry Seal $17,902 2027-28 BOLSA 6370690 BOLSANA WAY END LORETTA DR E AC 2 9 549 20 12,230 4/29/22 92 0 15 85 Preventive - Stop Gap $6,360 2027-28 BOLSA 6370736 BOLSANA WAY LORETTA DR BALBOA AV E AC 2 9 870 32 27,840 4/29/22 94 0 72 28 Preventive - Stop Gap $14,477 2027-28 CAPIS 6180349 CAPISTRANO AV QUIVERA ST ACAPULCO ST E AC 1 9 230 20 5,980 2/15/22 95 0 100 0 Preventive - Stop Gap $3,110 2027-28 CAPIS 6180351 CAPISTRANO AV ACAPULCO ST SANTA ANA ST E AC 1 9 230 20 5,980 2/15/22 84 69 29 2 Type II Slurry Seal $4,306 2027-28 CAPIS 6180353 CAPISTRANO AV SANTA ANA ST TIA JUANA ST E AC 1 9 230 20 5,980 2/15/22 95 0 100 0 Preventive - Stop Gap $3,110 2027-28 CAPIS 6180355 CAPISTRANO AV TIA JUANA ST BALBOA AV E AC 1 9 247 20 6,420 2/15/22 95 0 100 0 Preventive - Stop Gap $3,339 2027-28 CAPIS 6180532 CAPISTRANO AV NORIA ST ORO ST E AC 2 9 230 25 5,750 2/15/22 81 62 38 0 Type II Slurry Seal $4,140 2027-28 CAPIS 6180538 CAPISTRANO AV MIRAMAR ST NORIA ST E AC 2 9 230 25 5,750 2/15/22 99 0 100 0 Preventive - Stop Gap $2,990 2027-28 CAPIS 6180549 CAPISTRANO AV LA MIRADA ST MIRAMAR ST E AC 2 9 230 25 5,750 2/15/22 93 37 63 0 Preventive - Stop Gap $2,990 2027-28 CAPIS 6180551 CAPISTRANO AV KATELLA ST LA MIRADA ST E AC 2 9 230 25 5,750 2/15/22 95 0 100 0 Preventive - Stop Gap $2,990 2027-28 CAPIS 6180553 CAPISTRANO AV BAJA ST KATELLA ST E AC 2 9 230 25 6,440 2/15/22 86 51 49 0 Type II Slurry Seal $4,637 2027-28 CAPIS 6180556 CAPISTRANO AV SAN JOSE ST BAJA ST E AC 2 9 230 25 6,440 2/15/22 84 44 56 0 Type II Slurry Seal $4,637 2027-28 CORTE 6180361 CORTEZ AV QUIVERA ST ACAPULCO ST E AC 1 9 230 20 4,600 2/15/22 93 0 100 0 Preventive - Stop Gap $2,392 2027-28 CORTE 6180363 CORTEZ AV ACAPULCO ST SANTA ANA ST E AC 1 9 230 20 4,600 2/15/22 95 0 100 0 Preventive - Stop Gap $2,392 2027-28 CORTE 6180365 CORTEZ AV SANTA ANA ST TIA JUANA ST E AC 1 9 230 20 4,600 2/15/22 95 0 100 0 Preventive - Stop Gap $2,392 2027-28 CORTE 6180367 CORTEZ AV TIA JUANA ST BALBOA AV E AC 1 9 251 20 5,017 2/15/22 95 0 100 0 Preventive - Stop Gap $2,609 2027-28 CORTE 6180539 CORTEZ AV KATELLA ST LA MIRADA ST E AC 2 9 230 28 6,440 2/15/22 95 0 100 0 Preventive - Stop Gap $3,349 2027-28 CORTE 6180541 CORTEZ AV LA MIRADA ST MIRAMAR ST E AC 2 9 230 22 5,060 2/15/22 95 0 100 0 Preventive - Stop Gap $2,631 2027-28 CORTE 6180559 CORTEZ AV BAJA ST KATELLA ST E AC 2 9 230 22 4,268 2/15/22 88 44 56 0 Type II Slurry Seal $3,073 2027-28 DAVIS 6370683 DAVIS WY SOUTH END NORTH END E AC 2 9 410 20 11,480 2/18/22 94 0 92 8 Preventive - Stop Gap $5,970 2027-28 DEL M 6180324 DEL MAR AV NORIA ST ORO ST C AC 2 9 230 25 5,750 2/15/22 76 68 32 0 Type II Slurry Seal $4,140 2027-28 DEL M 6180325 DEL MAR AV MIRAMAR ST NORIA ST C AC 2 9 230 25 5,750 2/15/22 84 72 28 0 Type II Slurry Seal $4,140 2027-28 DEL M 6180329 DEL MAR AV KATELLA ST LA MIRADA ST C AC 2 9 230 25 5,750 2/15/22 93 0 100 0 Preventive - Stop Gap $2,990 2027-28 DEL M 6180331 DEL MAR AV LA MIRADA ST MIRAMAR ST C AC 2 9 230 25 5,750 2/15/22 92 0 87 13 Preventive - Stop Gap $2,990 2027-28 DEL M 6180338 DEL MAR AV ORO ST SANTA ANA ST C AC 2 9 920 36 33,120 2/15/22 89 0 100 0 Type II Slurry Seal $23,846 2027-28 DEL M 6180340 DEL MAR AV SANTA ANA ST TIA JUANA ST C AC 2 9 230 36 8,280 2/15/22 88 0 100 0 Type II Slurry Seal $5,962 2027-28 DEL M 6180342 DEL MAR AV TIA JUANA ST BALBOA ST C AC 2 9 242 36 8,727 2/15/22 93 0 100 0 Preventive - Stop Gap $4,538 2027-28 DEL M 6180543 DEL MAR AV BAJA ST KATELLA ST C AC 2 9 230 25 5,750 2/15/22 83 48 46 6 Type II Slurry Seal $4,140 2027-28 DEL M 6180544 DEL MAR AV END BAJA ST C AC 2 9 230 25 5,725 2/15/22 91 0 100 0 Type II Slurry Seal $4,122 2027-28 ENSEN 6180369 ENSENADA AV LA MIRADA ST NORIA ST E AC 2 9 440 20 8,800 2/15/22 90 0 100 0 Type II Slurry Seal $6,336 2027-28 GULL 6370731 GULL CL DAVIS WY MARLIN DR E AC 2 9 266 25 7,448 2/18/22 93 0 100 0 Preventive - Stop Gap $3,873 2027-28 KATEL 6180316 KATELLA ST SUMMIT DR N END P AC 2 9 302 30 9,060 2/16/22 95 0 100 0 Preventive - Stop Gap $4,711 2027-28 KATEL 6180554 KATELLA ST CAPISTRANO AV END (N) E AC 2 9 859 25 18,300 2/15/22 85 37 36 27 Type II Slurry Seal $13,176 2027-28 KATEL 6180558 KATELLA ST END (S) CAPISTRANO AV E AC 2 9 717 25 17,925 2/15/22 70 79 18 3 Type II Slurry Seal $12,906
27 City of Laguna Beach, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2026-2033 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Maint. / Rehab Recommendations Total $ 2027-28 KENDA 6370734 KENDAL DR BALBOA AVE END E AC 2 9 628 28 21,546 2/18/22 93 0 90 10 Preventive - Stop Gap $11,204 2027-28 LA MI 6180197 LA MIRADA ST ENSENADA AV N END E AC 2 9 874 25 20,163 2/16/22 92 0 75 25 Preventive - Stop Gap $10,485 2027-28 LA MI 6180330 LA MIRADA ST DEL MAR AV ENSENADA AV C AC 2 9 430 25 12,450 2/15/22 89 0 100 0 Type II Slurry Seal $8,964 2027-28 LA MI 6180540 LA MIRADA ST CORTEZ AV DEL MAR AV C AC 2 9 860 25 21,500 2/15/22 85 56 44 0 Type II Slurry Seal $15,480 2027-28 LA MI 6180542 LA MIRADA ST BONITA WY CORTEZ AV C AC 2 9 298 25 7,450 2/15/22 67 47 43 10 1.5" Grind-Overlay $36,282 2027-28 LORET 6370088 LORETTA DR BOLSANA DR SE END E AC 2 9 540 32 16,198 4/29/22 75 0 43 57 Type II Slurry Seal $11,663 2027-28 MARLI 6370733 MARLIN DR KENDAL DR GULL CL E AC 2 9 717 24 11,483 2/18/22 93 0 100 0 Preventive - Stop Gap $5,971 2027-28 MIRAM 6180344 MIRAMAR ST DEL MAR AV END (N) E AC 2 9 859 25 10,750 2/15/22 92 0 100 0 Preventive - Stop Gap $5,590 2027-28 MIRAM 6180550 MIRAMAR ST CORTEZ AV DEL MAR AV E AC 2 9 860 25 21,500 2/15/22 81 49 22 29 Type II Slurry Seal $15,480 2027-28 NORIA 6180326 NORIA ST ENSENADA AV END E AC 2 9 1,023 26 27,534 2/15/22 92 0 41 59 Preventive - Stop Gap $14,318 2027-28 ORO S 6180333 ORO ST CAPISTRANO AV DEL MAR AV E AC 2 9 430 25 10,750 2/15/22 79 0 80 20 Type II Slurry Seal $7,740 2027-28 PACVISTA 6180632 PACIFIC VISTA GAINSBOROUGH DR END P AC 2 9 485 18 8,730 4/29/22 88 0 32 68 Type II Slurry Seal $6,286 2027-28 PELIC 6370682 PELICAN ST GULL CL NORTH END E AC 2 9 376 24 9,022 2/18/22 84 40 41 19 Type II Slurry Seal $6,496 2027-28 QUIVE 6180350 QUIVERA ST CORTEZ AV CAPISTRANO AV E AC 1 9 430 20 9,458 2/15/22 93 0 100 0 Preventive - Stop Gap $4,918 2027-28 QUIVE 6180362 QUIVERA ST ALISOS AV CORTEZ AV E AC 1 9 352 20 7,738 2/15/22 94 0 74 26 Preventive - Stop Gap $4,024 2027-28 SAN JOSE 7000004 SAN JOSE ST CAPISTRANO AVE END E AC 0 9 61 25 1,285 2/15/22 73 55 13 32 Type II Slurry Seal $925 2027-28 SANDP 6370685 SANDPIPER DR WEST END DAVIS WY E AC 2 9 157 21 3,445 2/18/22 93 0 100 0 Preventive - Stop Gap $1,792 2027-28 SANTA ANA 7000006 SANTA ANA ST DEL MAR AV CORTEZ AVE E AC 0 9 830 20 16,600 2/15/22 90 38 41 21 Type II Slurry Seal $11,952 2027-28 SANTA ANA 7000007 SANTA ANA ST CORTEZ AVE END E AC 0 9 180 20 3,600 2/15/22 95 0 100 0 Preventive - Stop Gap $1,872 2027-28 SUMMI 6180381 SUMMIT DR KATELLA ST LA MIRADA ST C AC 2 9 563 24 14,016 2/16/22 74 48 50 2 Type II Slurry Seal $10,092 2027-28 SUMMI 6180534 SUMMIT DR BAJA ST KATELLA ST C AC 2 9 399 24 9,576 2/16/22 58 66 18 16 1.5" Grind-Overlay $46,635 2027-28 SUMMI 6180596 SUMMIT DR DIAMOND ST BAJA ST C AC 2 9 1,190 32 38,080 2/16/22 71 72 28 0 Type II Slurry Seal $27,418 2027-28 TIA J 6180343 TIA JUANA ST CAPISTRANO AV DEL MAR AV E AC 2 9 430 20 8,600 2/15/22 89 0 36 64 Type II Slurry Seal $6,192 2027-28 TIA J 6180356 TIA JUANA ST CORTEZ AV CAPISTRANO AV E AC 2 9 430 20 8,600 2/15/22 92 0 52 48 Preventive - Stop Gap $4,472 2027-28 TIA J 6180368 TIA JUANA ST END CORTEZ AV E AC 2 9 152 20 3,040 2/15/22 89 0 100 0 Type II Slurry Seal $2,189 $591,733
2028-29 AGATE ST 6180416 AGATE ST COAST HWY OCEAN WY P AC 2 10 260 30 7,800 2/17/22 94 0 100 0 Type II Slurry Seal $5,850 2028-29 AGATE ST 6180613 AGATE ST NE END CATALINA ST E AC 2 10 845 36 30,420 2/10/22 92 0 88 12 Type II Slurry Seal $22,815 2028-29 AGATE ST 6180653 AGATE ST GLENNEYRE ST CATALINA ST E AC 2 10 714 30 10,493 2/10/22 90 0 65 35 Type II Slurry Seal $7,870 2028-29 ARCH ST 6370742 ARCH ST GLENNEYRE ST CATALINA ST C AC 2 10 120 38 4,560 4/7/22 88 41 51 8 Type II Slurry Seal $3,420 2028-29 ARCH ST 6370747 ARCH ST GLENNEYRE ST END E AC 2 10 310 38 6,688 4/7/22 86 20 75 5 Type II Slurry Seal $5,016 2028-29 BLUEBIRD C 6180497 BLUEBIRD CANYON DR COAST HY CARMALITA ST C AC 2 10 1,026 38 31,000 2/10/22 93 0 77 23 Type II Slurry Seal $23,250 2028-29 BLUEBIRD C 6180505 BLUEBIRD CANYON DR CARMALITA ST SUMMIT DR C AC 2 10 680 38 15,450 2/10/22 92 0 42 58 Type II Slurry Seal $11,588 2028-29 CALLIOPE S 6180470 CALLIOPE ST TEMPLE TERR END E AC 2 10 603 42 25,326 2/10/22 94 0 90 10 Type II Slurry Seal $18,995 2028-29 CALLIOPE S 6180482 CALLIOPE ST COAST HY CATALINA ST E AC 2 10 566 42 23,772 2/10/22 94 0 72 28 Type II Slurry Seal $17,829 2028-29 CARME 6180467 CARMELITA ST CALLIOPE ST CRESS ST E AC 2 10 673 28 18,844 2/10/22 92 0 63 37 Type II Slurry Seal $14,133 2028-29 CARME 6180691 CARMELITA ST CENTER ST BLUEBIRD CANYON DR E AC 2 10 985 36 35,460 2/11/22 94 0 90 10 Type II Slurry Seal $26,595 2028-29 CATAL 6180417 CATALINA ST BLUEBIRD CANYON DR PALMER PL E AC 2 10 225 28 6,307 2/10/22 94 0 100 0 Type II Slurry Seal $4,730 2028-29 CATAL 6180463 CATALINA ST CALLIOPE ST BROOKS ST E AC 2 10 1,031 44 45,364 2/10/22 93 0 77 23 Type II Slurry Seal $34,023 2028-29 CATAL 6180658 CATALINA ST OSGOOD CT BLUEBIRD CANYON DR E AC 2 10 1,500 34 51,000 2/10/22 89 0 44 56 Type II Slurry Seal $38,250 2028-29 CATAL 6180702 CATALINA ST MOSS ST OSGOOD CT E AC 2 10 510 38 19,380 2/10/22 91 0 67 33 Type II Slurry Seal $14,535 2028-29 CENTE 6180665 CENTER ST CATALINA ST CARMELITA ST E AC 2 10 363 48 17,424 2/10/22 89 0 30 70 Type II Slurry Seal $13,068 2028-29 CENTE 6180668 CENTER ST COAST HY CATALINA ST E AC 2 10 675 48 32,400 2/11/22 93 0 90 10 Type II Slurry Seal $24,300 2028-29 CENTE 6180696 CENTER ST CARMELITA ST PEARL ST E AC 2 10 545 30 16,344 2/10/22 89 0 36 64 Type II Slurry Seal $12,258 2028-29 DIAMO 6180637 DIAMOND ST COAST HY CATALINA ST C AC 2 10 712 38 27,056 2/11/22 95 0 90 10 Preventive - Stop Gap $14,610 2028-29 DIAMO 6180640 DIAMOND ST COAST HY OCEAN WY C AC 2 10 230 38 8,740 2/17/22 94 0 100 0 Type II Slurry Seal $6,555 2028-29 DIAMO 6180674 DIAMOND ST CATALINA ST CRESTVIEW DR C AC 2 10 850 26 22,092 2/11/22 79 54 12 34 1.5" Grind-Overlay $111,785 2028-29 FLORA 6180664 FLORA ST GLENNEYRE ST CATALINA ST E AC 2 10 350 30 10,500 2/10/22 95 0 100 0 Preventive - Stop Gap $5,670 2028-29 FLORA 6180684 FLORA ST CATALINA ST CARMELITA ST E AC 2 10 350 30 10,500 2/10/22 95 0 100 0 Preventive - Stop Gap $5,670 2028-29 FLORA 6180689 FLORA ST CARMELITA ST SANTA CRUZ ST E AC 2 10 350 34 11,900 2/10/22 95 0 100 0 Preventive - Stop Gap $6,426 2028-29 GALEN 6180495 GALEN DR BLUEBIRD CANYON DR END E AC 2 10 493 24 11,833 2/16/22 86 0 31 69 Type II Slurry Seal $8,875 2028-29 GAVIO 6180492 GAVIOTA DR CRESS ST MOUNTAIN RD E AC 1 10 360 18 6,480 2/16/22 95 0 100 0 Preventive - Stop Gap $3,499 2028-29 MOSS 6370751 MOSS ST CATALINA ST SOUTH END E AC 2 10 620 28 17,360 2/11/22 96 0 100 0 Preventive - Stop Gap $9,374 2028-29 MOSS 6370756 MOSS ST OCEAN WY COAST HY E AC 2 10 231 36 8,308 2/17/22 95 0 100 0 Preventive - Stop Gap $4,486 2028-29 MOUNT 6180456 MOUNTAIN RD CATALINA ST CRESS ST E AC 2 10 944 42 39,648 2/10/22 84 19 31 50 Type II Slurry Seal $29,736 2028-29 MOUNT 6180476 MOUNTAIN RD COAST HY CATALINA ST E AC 2 10 566 42 23,772 2/10/22 78 52 22 26 1.5" Grind-Overlay $120,286 2028-29 MOUNT 6180489 MOUNTAIN RD S END COAST HY E AC 2 10 190 36 6,840 2/16/22 93 0 100 0 Type II Slurry Seal $5,130 2028-29 OCEAN 6180621 OCEAN WY AGATE ST PEARL ST E AC 2 10 354 36 12,730 2/17/22 91 0 48 52 Type II Slurry Seal $9,548 2028-29 OCEAN 6180644 OCEAN WY PEARL ST DIAMOND ST E AC 2 10 750 36 27,015 2/17/22 89 0 44 56 Type II Slurry Seal $20,261 2028-29 OCEAN 6180646 OCEAN WY RUBY ST MOSS ST E AC 2 10 350 36 12,606 2/17/22 92 0 52 48 Type II Slurry Seal $9,455 2028-29 OCEAN 6180652 OCEAN WY DIAMOND ST RUBY ST E AC 2 10 347 26 9,015 2/17/22 92 0 56 44 Type II Slurry Seal $6,762 2028-29 OSGOO 6180626 OSGOOD CT SW END CATALINA ST E AC 1 10 175 18 3,150 4/29/22 90 0 100 0 Type II Slurry Seal $2,363 2028-29 OSGOO 6180627 OSGOOD CT CATALINA ST NE END E AC 1 10 275 18 4,950 4/29/22 88 0 100 0 Type II Slurry Seal $3,713 2028-29 PALME 6180409 PALMER PL CATALINA ST END E AC 2 10 225 32 7,200 2/10/22 92 0 42 58 Type II Slurry Seal $5,400 2028-29 PEARL 6180630 PEARL ST SANTA CRUZ ST SUMMIT DR E AC 2 10 860 26 22,360 2/16/22 100 0 0 0 Preventive - Stop Gap $12,074 2028-29 PEARL 6180641 PEARL ST OCEAN WY COAST HY E AC 2 10 260 34 8,840 4/7/22 90 38 57 5 Type II Slurry Seal $6,630 2028-29 PEARL 6180642 PEARL ST COAST HY CATALINA ST E AC 2 10 714 38 27,132 2/10/22 94 0 83 17 Type II Slurry Seal $20,349 2028-29 PEARL 6180656 PEARL ST CATALINA ST CENTER ST E AC 2 10 600 28 16,800 2/10/22 95 0 100 0 Preventive - Stop Gap $9,072 2028-29 RADCL 6180628 RADCLIFF CT SW END CATALINA ST E AC 1 10 175 22 3,850 2/11/22 82 0 52 48 Type II Slurry Seal $2,888 2028-29 RADCL 6180701 RADCLIFF CT CATALINA ST N END E AC 1 10 110 22 2,420 2/11/22 90 0 68 32 Type II Slurry Seal $1,815 2028-29 RANDA 6180394 RANDALL WY SANTA CRUZ ST END E AC 2 10 339 28 9,499 2/10/22 94 0 100 0 Type II Slurry Seal $7,124 2028-29 RUBY PL 6180700 RUBY PL RUBY ST PRIVATE DR P AC 0 10 175 31 5,425 2/11/22 93 0 59 41 Type II Slurry Seal $4,069 2028-29 RUBY 6180650 RUBY ST OCEAN WY COAST HWY E AC 2 10 230 36 8,282 2/17/22 95 0 100 0 Preventive - Stop Gap $4,473 2028-29 RUBY 6180651 RUBY ST COAST HY GLENNEYRE ST E AC 2 10 305 36 10,980 2/11/22 95 0 100 0 Preventive - Stop Gap $5,929 2028-29 RUBY 6180678 RUBY ST GLENNEYRE ST RUBY PL E AC 2 10 516 24 12,384 2/11/22 82 54 46 0 Type II Slurry Seal $9,288 2028-29 SANTA 6180471 SANTA CRUZ ST CALLIOPE ST MOUNTAIN RD P AC 2 10 434 28 12,152 2/10/22 90 55 45 0 Type II Slurry Seal $9,114 2028-29 SANTA 6180473 SANTA CRUZ ST BLUEBIRD CANYON DR END E AC 2 10 375 28 10,500 2/10/22 93 0 44 56 Type II Slurry Seal $7,875 2028-29 SANTA 6180694 SANTA CRUZ ST PEARL ST BLUEBIRD CANYON DR E AC 2 10 620 20 12,400 2/10/22 93 0 60 40 Type II Slurry Seal $9,300 2028-29 SHADO 6180462 SHADOW LN CATALINA ST CARMELITA ST E AC 2 10 499 44 21,956 2/10/22 89 48 23 29 Type II Slurry Seal $16,467 2028-29 TEMPL TER 6180410 TEMPLE TERR CRESS ST CALLIOPE ST E AC 2 10 399 31 12,369 2/10/22 93 0 87 13 Type II Slurry Seal $9,277
28 City of Laguna Beach, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2026-2033 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Maint. / Rehab Recommendations Total $ 2028-29 UPLAN 6370743 UPLAND RD COAST HY GLENNEYRE ST P AC 2 10 345 31 10,695 4/7/22 83 21 57 22 Type II Slurry Seal $8,021 $831,891
2029-30 BLUEBIRD C 6180207 BLUEBIRD CANYON DR MADISON PL HALL PL C AC 2 11 496 26 12,896 2/16/22 74 64 36 0 1.5" Grind-Overlay $67,833 2029-30 BLUEBIRD C 6180210 BLUEBIRD CANYON DR BLUEBIRD CANYON / REGATTA RD JEFFERSON WY C AC 2 11 472 28 13,228 2/16/22 72 68 23 9 1.5" Grind-Overlay $69,580 2029-30 BLUEBIRD C 6180211 BLUEBIRD CANYON DR JEFFERSON WY MADISON PL C AC 2 11 429 28 2,727 2/16/22 72 44 53 3 1.5" Grind-Overlay $14,341 2029-30 BLUEBIRD C 6180216 BLUEBIRD CANYON DR HALL PL REGATTA RD C AC 2 11 1,188 26 30,883 2/16/22 92 0 47 53 Type II Slurry Seal $24,088 2029-30 BLUEBIRD C 6180218 BLUEBIRD CANYON DR KELLER WY BLUEBIRD CANYON / REGATTA RD C AC 2 11 378 28 6,047 2/16/22 89 0 100 0 Type II Slurry Seal $4,717 2029-30 BLUEBIRD C 6180220 BLUEBIRD CANYON DR EASTMAN WY KELLER WY C AC 2 11 622 32 7,642 2/16/22 91 56 44 0 Type II Slurry Seal $5,961 2029-30 BLUEBIRD C 6180244 BLUEBIRD CANYON DR RANCHO LAGUNA RD CHAMBERLIN WY C AC 2 11 570 42 6,013 2/16/22 79 60 26 14 1.5" Grind-Overlay $31,631 2029-30 BLUEBIRD C 6180256 BLUEBIRD CANYON DR ORIOLE DR RANCHO LAGUNA RD C AC 2 11 1,518 38 32,717 2/16/22 87 53 47 0 Type II Slurry Seal $25,519 2029-30 CREST 6180615 CRESTVIEW DR FERN ST NORTH END E AC 2 11A 781 24 18,752 4/7/22 81 12 14 74 1.5" Grind-Overlay $98,636 2029-30 CREST 6180616 CRESTVIEW DR CRESTVIEW PL FERN ST E AC 2 11A 508 32 20,288 2/11/22 82 0 36 64 Type II Slurry Seal $15,825 2029-30 CREST 6180708 CRESTVIEW DR CRESTVIEW PL DIAMOND ST E AC 2 11A 1,193 18 19,566 2/11/22 81 0 56 44 1.5" Grind-Overlay $102,917 2029-30 CREST PL 6180707 CRESTVIEW PL CRESTVIEW DR END P AC 2 11A 913 20 18,260 4/7/22 82 23 38 39 Type II Slurry Seal $14,243 2029-30 DIAMO 6180619 DIAMOND ST S END SUMMIT DR C AC 2 11 1,022 20 20,447 2/16/22 92 0 85 15 Type II Slurry Seal $15,949 2029-30 DIAMO 6180710 DIAMOND ST CRESTVIEW DR END C AC 2 11A 1,181 34 40,154 2/11/22 89 43 32 25 Type II Slurry Seal $31,320 2029-30 DYER 6180239 DYER WY DYER WY MILLER WY E AC 2 11 611 12 7,332 2/16/22 100 0 0 0 Preventive - Stop Gap $4,106 2029-30 DYER 6180262 DYER WY DYER PL MADISON PL E AC 0 11 175 14 2,445 2/16/22 100 0 0 0 Preventive - Stop Gap $1,369 2029-30 FLAMI 6180174 FLAMINGO RD ORIOLE DR END E AC 2 11 755 28 21,144 2/16/22 95 0 100 0 Preventive - Stop Gap $11,841 2029-30 GAINS 6180617 GAINSBOROUGH DR SW END GAINSBOROUGH WY E AC 2 11A 610 22 13,420 4/29/22 87 0 29 71 Type II Slurry Seal $10,468 2029-30 GAINS 6180636 GAINSBOROUGH DR GAINSBOROUGH PL GAINSBOROUGH WY E AC 2 11A 186 32 5,948 4/29/22 91 0 43 57 Type II Slurry Seal $4,640 2029-30 GAINS 6180709 GAINSBOROUGH DR GAINSBOROUGH PL DIAMOND ST E AC 2 11A 520 22 11,431 4/29/22 89 0 41 59 Type II Slurry Seal $8,916 2029-30 GAINS PL 6180631 GAINSBOURGOUGH PL GAINSBOROUGH DR END P AC 2 11A 237 24 5,688 4/29/22 91 46 43 11 Type II Slurry Seal $4,437 2029-30 LAVEN 6180164 LAVENDER LN MORNINGSIDE DR NE END E AC 2 11 172 36 6,210 2/16/22 93 0 70 30 Type II Slurry Seal $4,844 2029-30 MADIS 6180206 MADISON PL BLUEBIRD CANYON DR END E AC 2 11 701 26 19,426 2/16/22 85 0 33 67 Type II Slurry Seal $15,152 2029-30 MEADO 6180254 MEADOWLARK DR ORIOLE DR END E AC 2 11 720 24 17,280 2/16/22 91 0 100 0 Type II Slurry Seal $13,478 2029-30 MEADO LN 6180170 MEADOWLARK LN MEADOWLARK DR END P AC 2 11 532 32 18,224 2/16/22 91 0 100 0 Type II Slurry Seal $14,215 2029-30 MORNI CIR 6180217 MORNINGSIDE CIR MORNINGSIDE DR END P AC 2 11 79 31 2,449 2/16/22 96 0 38 62 Preventive - Stop Gap $1,371 2029-30 MORNI 6180246 MORNINGSIDE DR LAVENDER LN BLUEBIRD CANYON DR E AC 2 11 1,353 32 43,296 2/16/22 84 64 36 0 Type II Slurry Seal $33,771 2029-30 MORNI 6180248 MORNINGSIDE DR STARLIT DR LAVENDER LN E AC 2 11 1,327 32 42,464 2/16/22 90 0 60 40 Type II Slurry Seal $33,122 2029-30 MORNI 6180250 MORNINGSIDE DR RANCHO LAGUNA RD STARLIT DR E AC 2 11 2,248 32 71,952 2/16/22 85 0 83 17 Type II Slurry Seal $56,122 2029-30 ORIOL 6180168 ORIOLE DR ORIOLE DR EAST END E AC 2 11 40 28 1,118 2/16/22 81 0 100 0 1.5" Grind-Overlay $5,881 2029-30 ORIOL 6180253 ORIOLE DR BLUEBIRD CANYON DR FLAMIINGO RD E AC 2 11 1,179 32 37,728 2/16/22 89 0 90 10 Type II Slurry Seal $29,428 2029-30 RANCHO LAG 6180260 RANCHO LAGUNA RD BLUEBIRD CANYON DR MORNINGSIDE DR P AC 2 11 575 31 17,825 2/16/22 88 19 81 0 Type II Slurry Seal $13,904 2029-30 REGAT 6180249 REGATTA RD BLUEBIRD CANYON DR MORNINGSIDE DR E AC 2 11 589 24 14,138 2/16/22 92 0 90 10 Type II Slurry Seal $11,028 2029-30 REGAT 6180251 REGATTA RD BLUEBIRD CANYON DR SW BLUEBIRD CANYON DR NE E AC 2 11 1,001 26 26,035 2/16/22 85 27 32 41 Type II Slurry Seal $20,307 2029-30 REMBR 6180192 REMBRANDT DR VAN DYKE DR NORTH END E AC 2 11 1,101 18 19,825 2/16/22 81 63 20 17 1.5" Grind-Overlay $104,279 2029-30 REMBR 6180286 REMBRANDT DR VAN DYKE DR SUMMIT DR E AC 2 11 67 24 1,598 4/29/22 88 59 41 0 Type II Slurry Seal $1,247 2029-30 STARL 6180195 STARLIT DR MORNINGSIDE DR END E AC 2 11 1,181 32 37,792 2/16/22 82 12 28 60 Type II Slurry Seal $29,478 2029-30 SUMMI 6180188 SUMMIT DR SW END SUMMIT WY E AC 2 11 258 22 5,665 2/16/22 89 68 28 4 Type II Slurry Seal $4,419 2029-30 SUMMI 6180284 SUMMIT DR AGATE ST REMBRANDT DR C AC 2 11 512 28 14,330 2/16/22 76 74 26 0 1.5" Grind-Overlay $75,375 2029-30 SUMMI 6180287 SUMMIT DR PEARL ST DIAMOND ST C AC 2 11 576 32 18,424 2/16/22 88 49 51 0 Type II Slurry Seal $14,371 2029-30 SUMMI 6180288 SUMMIT DR SUMMIT PL SUMMIT DR E AC 2 11 1,960 24 47,629 2/16/22 77 0 20 80 1.5" Grind-Overlay $250,527 2029-30 SUMMI 6180300 SUMMIT DR BLUEBIRD CANYON DR AGATE ST C AC 2 11 250 22 5,500 2/16/22 87 17 49 34 Type II Slurry Seal $4,290 2029-30 SUMMI 6180715 SUMMIT DR REMBRANDT DR PEARL ST C AC 2 11 204 22 4,498 2/16/22 94 0 100 0 Type II Slurry Seal $3,508 2029-30 VAN D 6180193 VAN DYKE DR REMBRANDT DR NE END E AC 2 11 1,492 26 38,779 2/16/22 75 59 36 5 1.5" Grind-Overlay $203,979 $1,512,431
2030-31 ANACAPA WY 6130051 ANACAPA WY WEST END SKYLINE DR E AC 2 12 1,616 20 32,311 4/7/22 86 43 37 20 Type II Slurry Seal $26,172 2030-31 ATLANTIC W 6130042 ATLANTIC WY CARIBBEAN WY END E AC 2 12 239 26 6,214 4/7/22 84 39 61 0 Type II Slurry Seal $5,033 2030-31 BERMUDA DR 6130011 BERMUDA DR CORONADO DR NORTH END E AC 2 12 445 24 10,682 4/7/22 97 0 85 15 Preventive - Stop Gap $6,196 2030-31 BLUMONT ST 6130094 BLUMONT ST PARK AV END E AC 2 12 823 32 26,336 4/8/22 89 21 41 38 Type II Slurry Seal $21,332 2030-31 BOUNTY WY 6130001 BOUNTY WY PACIFIC AV EAST END E AC 2 12 466 24 11,192 4/7/22 96 60 23 17 Type II Slurry Seal $9,065 2030-31 BOUNTY WY 6130006 BOUNTY WY PACIFIC AV NW END E AC 2 12 240 24 5,750 4/7/22 98 0 51 49 Preventive - Stop Gap $3,335 2030-31 CARIB 6130038 CARIBBEAN WY CORAL DR ATLANTIC WY E AC 2 12 1,144 34 38,896 4/7/22 89 25 75 0 Type II Slurry Seal $31,506 2030-31 CARIB 6130040 CARIBBEAN WY ATLANTIC WY TAHITI AV E AC 2 12 508 34 17,273 4/7/22 89 24 73 3 Type II Slurry Seal $13,991 2030-31 CORAL 6130018 CORAL DR PACIFIC AV NW END E AC 2 12 367 24 8,811 4/7/22 98 0 45 55 Preventive - Stop Gap $5,110 2030-31 CORAL 6130037 CORAL DR PACIFIC AV END E AC 2 12 887 28 24,836 4/7/22 93 34 58 8 Type II Slurry Seal $20,117 2030-31 CORON 6130050 CORONADO DR SKYLINE DR END P AC 2 12 924 26 24,024 4/7/22 91 22 31 47 Type II Slurry Seal $19,459 2030-31 HILLE 6130097 HILLEDGE DR BLUMONT ST MYSTIC WY E AC 2 12 879 28 24,612 4/8/22 87 27 69 4 Type II Slurry Seal $19,936 2030-31 LA VI 6130021 LA VISTA DR NW END MANZANITA DR E AC 2 12 407 22 8,949 4/8/22 83 13 58 29 Type II Slurry Seal $7,249 2030-31 MANZA 6130092 MANZANITA DR PARK AV LA VISTA DR E AC 2 12 679 34 23,071 4/4/22 74 55 30 15 1.5" Grind-Overlay $126,196 2030-31 MANZA 6130109 MANZANITA DR LA VISTA DR SKYLINE DR E AC 2 12 812 36 29,230 4/8/22 80 52 33 15 Type II Slurry Seal $23,676 2030-31 MOORE 6130008 MOOREA WY SKYLINE DR EAST END E AC 2 12 470 24 11,287 4/7/22 76 26 58 16 1.5" Grind-Overlay $61,738 2030-31 MYSTI LN 6130019 MYSTIC LN MYSTIC WY END P AC 0 12 177 18 3,186 4/8/22 84 10 86 4 Type II Slurry Seal $2,581 2030-31 MYSTI V 6130013 MYSTIC VIEW MYSTIC WY END P AC 0 12 1,144 26 29,744 4/8/22 93 0 62 38 Type II Slurry Seal $24,093 2030-31 MYSTI 6130054 MYSTIC WY SKYLINE DR VISTA LN E AC 2 12 1,375 24 33,000 4/8/22 94 0 40 60 Type II Slurry Seal $26,730 2030-31 MYSTI 6130096 MYSTIC WY HILLEDGE DR VISTA LN E AC 2 12 1,359 36 48,924 4/8/22 84 52 46 2 Type II Slurry Seal $39,628 2030-31 PACIF 6130009 PACIFIC AV CORAL DR END E AC 2 12 343 28 9,660 4/7/22 95 0 63 37 Type II Slurry Seal $7,825 2030-31 PACIF 6130045 PACIFIC AV SKYLINE DR CORAL DR E AC 2 12 719 28 20,132 4/7/22 93 35 65 0 Type II Slurry Seal $16,307 2030-31 PARK 6130216 PARK AV TAHITI AV HIDDEN VALLEY RD C AC 2 12 1,039 48 49,872 4/7/22 79 46 54 0 1.5" Grind-Overlay $272,800 2030-31 PARK 6130255 PARK AV WENDT TERR HIDDEN VALLEY CANYON RD C AC 2 12 3,300 42 138,600 4/5/22 80 45 52 3 Type II Slurry Seal $112,266 2030-31 PITCA 6130007 PITCAIRN PL PACIFIC AV NORTH END E AC 2 12 98 28 2,754 4/7/22 96 0 100 0 Type II Slurry Seal $2,230 2030-31 SAMOA 6130005 SAMOA WY SKYLINE DR END E AC 2 12 293 22 6,446 4/7/22 87 0 96 4 Type II Slurry Seal $5,221 2030-31 SKYLI 6130004 SKYLINE DR ATLANTIC WY EAST END C AC 2 12 169 36 6,089 4/7/22 83 52 46 2 Type II Slurry Seal $4,932 2030-31 SKYLI 6130041 SKYLINE DR PACIFIC AV ATLANTIC WY C AC 2 12 1,033 34 35,116 4/7/22 89 0 100 0 Type II Slurry Seal $28,444 2030-31 SKYLI 6130043 SKYLINE DR SAMOA WY PACIFIC AV C AC 2 12 863 36 31,074 4/7/22 88 24 74 2 Type II Slurry Seal $25,170 2030-31 SKYLI 6130048 SKYLINE DR CORONADO DR SAMOA WY C AC 2 12 1,809 38 68,742 4/7/22 84 38 62 0 Type II Slurry Seal $55,681 2030-31 SKYLI 6130053 SKYLINE DR VISTA LN CORONADO DR C AC 2 12 1,138 38 43,244 4/7/22 84 39 55 6 Type II Slurry Seal $35,028 2030-31 SKYLI 6130108 SKYLINE DR PARK AV MANZANITA DR C AC 2 12 249 26 6,478 4/7/22 92 38 62 0 Type II Slurry Seal $5,247 2030-31 SKYLI 6130112 SKYLINE DR MANZANITA DR VISTA LN C AC 2 12 1,279 30 38,355 4/7/22 80 39 30 31 Type II Slurry Seal $31,068
29 City of Laguna Beach, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2026-2033 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Maint. / Rehab Recommendations Total $ 2030-31 TAHIT 6130017 TAHITI AV CARIBBEAN WY PARK AV E AC 2 12 523 28 14,651 4/7/22 83 27 67 6 Type II Slurry Seal $11,867 2030-31 TAHIT 6130039 TAHITI AV CORAL DR CARIBBEAN WY E AC 2 12 1,551 28 43,419 4/7/22 89 0 93 7 Type II Slurry Seal $35,169 2030-31 VIRGI PK 6130020 VIRGINIA PARK DR BLUMONT ST END P AC 2 12 928 24 22,272 4/8/22 79 60 34 6 1.5" Grind-Overlay $121,828 2030-31 VISTA 6130015 VISTA LN VISTA LN EAST END E AC 2 12 242 22 5,319 4/8/22 84 24 72 4 Type II Slurry Seal $4,308 2030-31 VISTA 6130016 VISTA LN MYSTIC WY NORTH END E AC 2 12 770 20 15,395 4/8/22 63 66 27 7 1.5" Grind-Overlay $84,211 2030-31 VISTA 6130024 VISTA LN WEST END SKYLINE DR E AC 2 12 240 20 4,790 4/7/22 90 29 51 20 Type II Slurry Seal $3,880 2030-31 VISTA 6130035 VISTA LN MYSTIC WY SOUTH END E AC 2 12 550 20 11,002 4/8/22 79 66 34 0 1.5" Grind-Overlay $60,180 $1,416,806
2031-32 ANITA ST 6180027 ANITA ST CATALINA ST WILSON ST E AC 2 13 804 38 30,552 2/16/22 80 38 62 0 1.5" Grind-Overlay $173,841 2031-32 ANITA ST 6180111 ANITA ST WILSON ST TEMPLE TE E AC 2 13 665 38 25,279 2/10/22 79 56 22 22 1.5" Grind-Overlay $143,837 2031-32 ANITA ST 6180420 ANITA ST GAVIOTA DR COAST HY E AC 2 13 145 38 5,510 2/16/22 85 0 100 0 Type II Slurry Seal $4,628 2031-32 ANITA ST 6180421 ANITA ST COAST HY CATALINA ST E AC 2 13 566 38 21,508 4/8/22 67 80 18 2 1.5" Grind-Overlay $122,381 2031-32 ARROYO DR 6130029 ARROYO DR CANYON ACRES DR NE END E AC 2 13 925 30 27,765 4/4/22 92 29 71 0 Type II Slurry Seal $23,323 2031-32 AVALON AV 6180030 AVALON AV ANITA ST SEAVIEW ST E AC 2 13 155 40 6,200 2/10/22 92 0 67 33 Type II Slurry Seal $5,208 2031-32 AVALON AV 6180041 AVALON AV SEAVIEW ST THALIA ST E AC 2 13 205 34 6,968 2/16/22 94 0 80 20 Type II Slurry Seal $5,853 2031-32 AVALON AV 6180119 AVALON AV SEAVIEW ST SE SEAVIEW ST NW E AC 2 13 50 36 1,800 2/16/22 94 0 100 0 Type II Slurry Seal $1,512 2031-32 BRANGWYM W 6180513 BRANGWYM WY CRESS ST BROOKS ST E AC 2 13 371 34 12,605 4/29/22 89 84 16 0 Type II Slurry Seal $10,588 2031-32 BROOKS ST 6180429 BROOKS ST COAST HY CATALINA ST E AC 2 13 565 40 22,600 2/10/22 94 0 100 0 Type II Slurry Seal $18,984 2031-32 BROOKS ST 6180431 BROOKS ST COAST HY OCEAN FRONT E AC 2 13 264 40 10,560 2/16/22 95 0 100 0 Type II Slurry Seal $8,870 2031-32 BROOKS ST 6180514 BROOKS ST CATALINA ST TEMPLE TERR E AC 2 13 1,226 58 71,108 2/10/22 90 0 100 0 Type II Slurry Seal $59,731 2031-32 CANYO 6130031 CANYON ACRES DR LEWIS LN EAST END E AC 2 13 2,580 30 46,170 4/4/22 91 25 44 31 Type II Slurry Seal $38,783 2031-32 CANYO 6130135 CANYON ACRES DR LAGUNA CANYON RD LEWELLYN DR E AC 2 13 953 38 36,214 4/4/22 92 34 47 19 Type II Slurry Seal $30,420 2031-32 CATAL 6180516 CATALINA ST BROOKS ST THALIA ST E AC 2 13 1,129 44 49,676 2/10/22 85 73 27 0 Type II Slurry Seal $41,728 2031-32 CRESS 6180448 CRESS ST COAST HY CATALINA ST C AC 2 13 569 40 22,760 2/10/22 94 0 100 0 Type II Slurry Seal $19,118 2031-32 CRESS 6180453 CRESS ST CATALINA ST BRANGWYM WY C AC 2 13 771 40 30,840 2/10/22 92 0 69 31 Type II Slurry Seal $25,906 2031-32 CRESS 6180494 CRESS ST COAST HY END C AC 2 13 209 42 8,778 2/16/22 95 0 100 0 Type II Slurry Seal $7,374 2031-32 CRESS 6180512 CRESS ST BRANGWYN WY BLUEBIRD CANYON DR C AC 2 13 1,086 40 43,440 2/16/22 88 34 47 19 Type II Slurry Seal $36,490 2031-32 CUMMINGS P 6180138 CUMMINGS PL SEAVIEW ST ANITA ST P AC 2 13 155 30 4,650 2/16/22 95 0 100 0 Type II Slurry Seal $3,906 2031-32 GAVIO 6180424 GAVIOTA DR BROOKS ST OAK ST E AC 2 13 1,025 36 36,900 2/16/22 94 0 88 12 Type II Slurry Seal $30,996 2031-32 GAVIO 6180510 GAVIOTA DR CRESS ST BROOKS ST E AC 1 13 407 20 8,140 2/16/22 95 0 100 0 Type II Slurry Seal $6,837 2031-32 LAGUN 6130143 LAGUNA CYN RD FRONTAGE LAGUNA CANYON RD WOODLAND DR E AC 1 13 1,305 34 44,363 4/4/22 86 17 52 31 Type II Slurry Seal $37,265 2031-32 LOMBA 6180112 LOMBARDY LN WILSON ST TEMPLE TE E AC 2 13 627 26 16,290 2/16/22 90 0 100 0 Type II Slurry Seal $13,684 2031-32 LOMBA 6180122 LOMBARDY LN ANITA ST WILSON ST E AC 2 13 579 28 16,210 2/16/22 91 0 65 35 Type II Slurry Seal $13,616 2031-32 OAK S 6180125 OAK ST WILSON ST TEMPLE TERR E AC 2 13 524 38 19,923 2/10/22 80 42 58 0 1.5" Grind-Overlay $113,359 2031-32 OAK S 6180126 OAK ST CATALINA ST WILSON ST E AC 2 13 805 38 30,586 2/10/22 92 0 94 6 Type II Slurry Seal $25,692 2031-32 OAK S 6180181 OAK ST TEMPLE TE EAST END E AC 2 13 567 28 15,875 4/29/22 94 0 28 72 Type II Slurry Seal $13,335 2031-32 OAK S 6180432 OAK ST GAVIOTA DR COAST HY E AC 2 13 147 38 5,605 2/16/22 94 0 69 31 Type II Slurry Seal $4,708 2031-32 OAK S 6180460 OAK ST COAST HY CATALINA ST E AC 2 13 566 38 21,508 2/10/22 94 0 100 0 Type II Slurry Seal $18,067 2031-32 OCEAN FRO 6180509 OCEAN FRONT BROOKS ST END P AC 2 13 408 20 8,160 4/8/22 85 75 4 21 Type II Slurry Seal $6,854 2031-32 SEAVI 6180115 SEAVIEW ST WILSON ST TEMPLE TERR E AC 2 13 812 30 24,373 2/10/22 83 0 64 36 Type II Slurry Seal $20,473 2031-32 SEAVI 6180118 SEAVIEW ST AVALON AV WILSON ST E AC 2 13 398 30 11,940 2/10/22 77 34 36 30 1.5" Grind-Overlay $67,939 2031-32 SEAVI 6180120 SEAVIEW ST CATALINA ST AVALON AV E AC 2 13 303 30 9,105 2/16/22 93 0 86 14 Type II Slurry Seal $7,648 2031-32 TEMPL PL 6180186 TEMPLE PL TEMPLE TER END P AC 2 13 228 31 7,068 4/29/22 93 36 46 18 Type II Slurry Seal $5,937 2031-32 TEMPL TER 6180113 TEMPLE TERR OAK ST THALIA ST E AC 2 13 811 31 25,141 2/10/22 81 41 30 29 1.5" Grind-Overlay $143,052 2031-32 TEMPL TER 6180298 TEMPLE TERR CRESS ST OAK ST E AC 2 13 808 32 25,856 4/29/22 74 78 22 0 1.5" Grind-Overlay $147,121 2031-32 WILSO 6180033 WILSON ST ANITA ST SEAVIEW ST E AC 2 13 155 30 4,650 2/17/22 100 0 0 0 Preventive - Stop Gap $2,930 2031-32 WILSO 6180035 WILSON ST SEAVIEW ST THALIA ST E AC 2 13 255 40 10,186 2/10/22 99 0 21 79 Preventive - Stop Gap $6,417 2031-32 WILSO 6180123 WILSON ST LOMBARDY LN ANITA ST E AC 2 13 105 26 2,723 2/16/22 85 56 44 0 Type II Slurry Seal $2,287 2031-32 WILSO 6180124 WILSON ST OAK ST LOMBARDY LN E AC 2 13 209 22 4,608 2/16/22 93 0 100 0 Type II Slurry Seal $3,870 2031-32 WOODL 6130138 WOODLAND DR LAGUNA CANYON RD VICTORIA WK E AC 2 13 741 38 28,158 4/4/22 90 29 66 5 Type II Slurry Seal $23,653 $1,498,219
2032-33 ALTA LO 6370492 ALTA LOMA DR HOLLY DR CEANOTHUS DR P AC 2 1 493 16 7,888 2/18/22 80 0 47 53 1.5" Grind-Overlay $46,697 2032-33 BROOKS ST 6370529 BROOKS ST PEDRO ST SE PEDRO ST NW E AC 2 1 1,250 24 30,000 2/18/22 87 0 30 70 Type II Slurry Seal $26,100 2032-33 BROOKS ST 6370531 BROOKS ST MONTEREY ST PEDRO ST E AC 2 1 491 28 13,740 2/18/22 91 0 72 28 Type II Slurry Seal $11,954 2032-33 BROOKS ST 6370551 BROOKS ST BROOKS ST N PEDRO ST E AC 2 1 520 24 12,487 2/18/22 92 0 100 0 Type II Slurry Seal $10,864 2032-33 CATAL 6370415 CATALINA ST MONTEREY ST WEST ST E AC 2 1 650 30 19,489 2/18/22 93 0 100 0 Type II Slurry Seal $16,955 2032-33 CATAL 6370417 CATALINA ST COAST HY MONTEREY ST E AC 2 1 165 34 5,616 2/18/22 95 0 100 0 Type II Slurry Seal $4,886 2032-33 CEANO 6370475 CEANOTHUS DR ALTA LOMA DR NW END E AC 4 1 1,670 28 46,751 2/18/22 93 0 54 46 Type II Slurry Seal $40,673 2032-33 DRIFT 6370609 DRIFTWOOD DR WESLEY DR OCEAN VIEW VISTA DR E AC 2 1A 628 26 16,315 4/8/22 88 0 45 55 Type II Slurry Seal $14,194 2032-33 DRIFT 6370612 DRIFTWOOD DR OCEAN VIEW VISTA DR NORTH END E AC 2 1A 544 26 14,132 4/8/22 86 0 39 61 Type II Slurry Seal $12,295 2032-33 EAGAN 6370412 EAGAN RD FIRST AV WEST ST E AC 2 1 224 28 6,269 2/18/22 95 0 100 0 Type II Slurry Seal $5,454 2032-33 EAGLE RK 6370365 EAGLE ROCK WY SCENIC DR MAR VISTA AV E AC 2 1 230 28 6,440 2/18/22 84 0 27 73 Type II Slurry Seal $5,603 2032-33 EAGLE RK 6370405 EAGLE ROCK WY COAST HY VIRGINIA WY E AC 2 1 200 32 6,400 2/18/22 94 0 100 0 Type II Slurry Seal $5,568 2032-33 EAGLE RK 6370408 EAGLE ROCK WY VIRGINIA WY SCENIC DR E AC 2 1 1,070 24 25,680 2/18/22 94 0 100 0 Type II Slurry Seal $22,342 2032-33 EIGHT 6370256 EIGHTH AV COAST HY VIRGINIA WY E AC 2 1 198 18 3,564 2/18/22 95 0 100 0 Type II Slurry Seal $3,101 2032-33 EIGHT 6370257 EIGHTH AV VIRGINIA WY SUNSET AV E AC 2 1 840 22 18,480 2/18/22 93 0 100 0 Type II Slurry Seal $16,078 2032-33 EL PA 6180008 EL PASEO ST NW END LAGUNA AV E AAC 2 1 215 26 5,590 5/1/22 100 0 0 0 Type II Slurry Seal $4,863 2032-33 FIFTH 6370319 FIFTH AV SCENIC DR EAST END E AC 2 1 150 30 4,509 2/18/22 95 0 100 0 Type II Slurry Seal $3,923 2032-33 FIFTH 6370379 FIFTH AV COAST HY VIRGINIA WY E AC 2 1 200 38 7,602 2/18/22 92 0 100 0 Type II Slurry Seal $6,613 2032-33 FIFTH 6370381 FIFTH AV VIRGINIA WY SCENIC DR E AC 2 1 343 38 13,034 2/18/22 93 0 73 27 Type II Slurry Seal $11,340 2032-33 FIRST 6370317 FIRST AV MAR VISTA AVE SE END P AC 2 1 409 30 12,270 4/8/22 83 51 47 2 1.5" Grind-Overlay $72,638 2032-33 FOURT 6370395 FOURTH AV COAST HY VIRGINIA WY C AC 2 1 200 38 7,602 2/18/22 91 0 100 0 Type II Slurry Seal $6,613 2032-33 FOURT 6370399 FOURTH AV VIRGINIA WY SCENIC DR C AC 2 1 529 28 14,812 2/18/22 95 0 100 0 Type II Slurry Seal $12,886 2032-33 HOLLY 6370483 HOLLY DR ALTA LOMA DR NORTH END E AC 2 1 1,565 26 40,686 2/18/22 90 41 43 16 Type II Slurry Seal $35,397 2032-33 HOLLY 6370490 HOLLY DR ALTA LOMA DR OCEAN VIEW ST E AC 2 1 667 32 21,356 2/18/22 91 0 56 44 Type II Slurry Seal $18,579 2032-33 LAGUN AV 6180099 LAGUNA AV COAST HY EL PASEO ST P PCC 2 1 148 30 4,440 4/29/22 83 25 42 33 1.5" Grind-Overlay $26,285 2032-33 MAR V 6370321 MAR VISTA AVE SUNSET AV EAST END E AC 2 1 196 38 7,450 2/18/22 94 0 100 0 Type II Slurry Seal $6,482 2032-33 MAR V 6370366 MAR VISTA AVE EAGLEROCK WY THIRD AV E AC 2 1 614 26 15,964 2/18/22 90 51 49 0 Type II Slurry Seal $13,889 2032-33 MAR V 6370370 MAR VISTA AVE SUNSET AV THIRD AV E AC 2 1 674 26 17,519 2/18/22 92 0 100 0 Type II Slurry Seal $15,242 2032-33 MAR V 6370434 MAR VISTA AVE EAGLEROCK WY END E AC 2 1 340 26 8,840 4/8/22 86 80 17 3 Type II Slurry Seal $7,691
30 City of Laguna Beach, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2026-2033 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Maint. / Rehab Recommendations Total $ 2032-33 MARIL 6370611 MARILYN DR OCEAN VIEW VISTA DR NORTH END E AC 2 1A 621 26 16,152 4/8/22 80 30 42 28 1.5" Grind-Overlay $95,621 2032-33 MARIL 6370628 MARILYN DR WESLEY DR OCEAN VIEW VISTA DR E AC 2 1A 741 32 23,709 4/8/22 86 62 38 0 Type II Slurry Seal $20,627 2032-33 MONTE 6370406 MONTEREY ST EAGLEROCK WY WEST ST E AC 2 1 753 28 21,084 2/18/22 94 0 100 0 Type II Slurry Seal $18,343 2032-33 MONTE 6370478 MONTEREY ST WEST ST BROOKS ST E AC 2 1 594 28 16,632 2/18/22 90 0 78 22 Type II Slurry Seal $14,470 2032-33 MONTE 6370537 MONTEREY ST BROOKS ST S BROOKS ST N E AC 1 1 1,744 38 66,273 2/18/22 91 0 66 34 Type II Slurry Seal $57,658 2032-33 NINTH 6370252 NINTH AV COAST HY VIRGINIA WY E AC 2 1 200 24 4,800 2/18/22 94 0 100 0 Type II Slurry Seal $4,176 2032-33 NINTH 6370258 NINTH AV VIRGINIA WY LUPIN PL E AC 2 1 579 24 13,896 2/18/22 93 0 61 39 Type II Slurry Seal $12,090 2032-33 OCEAN V 6370535 OCEAN VIEW ST MONTEREY ST HOLLY DR P AC 2 1 480 24 11,520 2/18/22 93 0 100 0 Type II Slurry Seal $10,022 2032-33 OCEAN VIEW 6370610 OCEAN VIEW VISTA DR MARILYN DR END P AC 2 1A 360 31 11,160 4/8/22 92 26 74 0 Type II Slurry Seal $9,709 2032-33 OCEAN VIEW 6370625 OCEAN VIEW VISTA DR DRIFTWOOD DR END P AC 0 1A 1,007 31 31,217 4/8/22 84 19 43 38 Type II Slurry Seal $27,159 2032-33 OCEAN VIEW 6370629 OCEAN VIEW VISTA DR MARILYN DR DRIFTWOOD DR P AC 2 1A 407 31 12,617 4/8/22 87 24 68 8 Type II Slurry Seal $10,977 2032-33 PASEO 6370474 PASEO DEL SUR RICO RD EAST END E AC 2 1 515 28 14,432 4/8/22 92 0 100 0 Type II Slurry Seal $12,555 2032-33 PASEO 6370534 PASEO DEL SUR TOTO LOMA LN RICO RD E AC 2 1 831 28 23,261 4/8/22 99 0 100 0 Type II Slurry Seal $20,237 2032-33 PEDRO 6370552 PEDRO ST BROOKS ST SE BROOKS ST NW E AC 2 1 1,347 24 32,333 2/18/22 93 0 100 0 Type II Slurry Seal $28,129 2032-33 RICO 6370473 RICO RD PASEO DEL SUR EAST END E AC 2 1 269 28 7,524 4/8/22 83 18 82 0 1.5" Grind-Overlay $44,543 2032-33 SCENI 6370382 SCENIC DR THIRD AV SECOND AV E AC 2 1 349 28 9,772 2/18/22 95 0 100 0 Type II Slurry Seal $8,502 2032-33 SCENI 6370388 SCENIC DR FOURTH AV THIRD AV E AC 2 1 356 28 9,968 2/18/22 95 0 100 0 Type II Slurry Seal $8,672 2032-33 SCENI 6370393 SCENIC DR FIFTH AV FOURTH AV E AC 2 1 354 28 9,922 2/18/22 93 0 93 7 Type II Slurry Seal $8,632 2032-33 SCENI 6370674 SCENIC DR SECOND AV EAGLEROCK WY E AC 2 1 252 22 5,544 2/18/22 94 0 83 17 Type II Slurry Seal $4,823 2032-33 SECON 6370386 SECOND AV COAST HY VIRGINIA WY E AC 2 1 200 36 7,201 2/18/22 90 0 100 0 Type II Slurry Seal $6,265 2032-33 SECON 6370403 SECOND AV VIRGINIA WY SCENIC DR E AC 2 1 900 24 21,600 2/18/22 93 0 79 21 Type II Slurry Seal $18,792 2032-33 SEVEN 6370378 SEVENTH AV COAST HY END E AC 2 1 401 34 13,634 2/18/22 59 76 6 18 1.5" Grind-Overlay $80,713 2032-33 SUNSE 6370357 SUNSET AV EIGHTH AV VIRGINIA WY E AC 2 1 1,220 26 31,720 2/18/22 93 0 100 0 Type II Slurry Seal $27,596 2032-33 SUNSE 6370358 SUNSET AV MAR VISTA AV EIGHTH AV E AC 2 1 1,180 30 35,400 2/18/22 92 0 100 0 Type II Slurry Seal $30,798 2032-33 TENTH 6370247 TENTH AV COAST HY VIRGINIA WY E AC 2 1 200 30 6,000 2/18/22 94 0 100 0 Type II Slurry Seal $5,220 2032-33 TENTH 6370261 TENTH AV VIRGINIA WY BRACKEN WY E AC 2 1 355 22 5,224 2/18/22 93 0 100 0 Type II Slurry Seal $4,545 2032-33 THIRD 6370316 THIRD AV MAR VISTA AV SE END E AC 2 1 306 28 8,558 4/8/22 91 25 42 33 Type II Slurry Seal $7,445 2032-33 THIRD 6370371 THIRD AV SCENIC DR MAR VISTA AV E AC 2 1 230 40 9,207 2/18/22 91 0 100 0 Type II Slurry Seal $8,010 2032-33 THIRD 6370390 THIRD AV COAST HY VIRGINIA WY E AC 2 1 200 36 7,202 2/18/22 95 0 90 10 Type II Slurry Seal $6,265 2032-33 THIRD 6370401 THIRD AV VIRGINIA WY SCENIC DR E AC 2 1 715 32 22,880 2/18/22 93 0 100 0 Type II Slurry Seal $19,906 2032-33 VALID 6370479 VALIDO RD WEST ST TOTO LOMA LN E AC 2 1 176 28 4,936 4/8/22 86 0 85 15 Type II Slurry Seal $4,294 2032-33 VIRGI 6370259 VIRGINIA WY NINTH AV SUNSET AV E AC 2 1 678 22 14,916 2/18/22 88 0 50 50 Type II Slurry Seal $12,977 2032-33 VIRGI 6370356 VIRGINIA WY SEVENTH AV NINTH AV E AC 2 1 653 22 14,366 2/18/22 94 0 90 10 Type II Slurry Seal $12,498 2032-33 VIRGI 6370380 VIRGINIA WY FIFTH AV THIRD AV E AC 2 1 600 20 12,000 2/18/22 94 0 100 0 Type II Slurry Seal $10,440 2032-33 VIRGI 6370400 VIRGINIA WY THIRD AV EAGLEROCK WY E AC 2 1 600 20 12,000 2/18/22 89 0 42 58 Type II Slurry Seal $10,440 2032-33 VIRGI 6370798 VIRGINIA WY FIFTH AV END E AC 2 1 185 18 3,330 4/29/22 94 44 56 0 Type II Slurry Seal $2,897 2032-33 WESLE 6370091 WESLEY DR MARILYN DR DRIFTWOOD DR E AC 2 1A 255 36 9,180 4/8/22 91 27 73 0 Type II Slurry Seal $7,987 2032-33 WESLE 6370092 WESLEY DR DRIFTWOOD DR END E AC 2 1A 420 36 15,124 4/8/22 72 87 13 0 1.5" Grind-Overlay $89,536 2032-33 WESLE 6370630 WESLEY DR COAST HY MARILYN DR E AC 2 1A 561 44 24,684 4/8/22 61 74 25 1 1.5" Grind-Overlay $146,129 2032-33 WEST 6370363 WEST ST MONTEREY ST VALIDO RD E AC 2 1 1,065 28 29,820 2/18/22 89 0 57 43 Type II Slurry Seal $25,943 2032-33 WEST 6370433 WEST ST COAST HY MONTEREY ST E AC 2 1 165 34 5,610 2/18/22 95 0 100 0 Type II Slurry Seal $4,881 $1,445,729
31 City of Laguna Beach, CA Page 13
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
XII. APPENDIX B – COMPLETE STREET LISTING CURRENT CONDITIONS 32 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date Arterial / Collector (MPAH)
BLUEBIRD C 6180196 BLUEBIRD CANYON DR SUMMIT DR CRESS ST C AC 2 11 762 28 17,276 5/26/26 67 63 10 27 Surface Treatment - Slurry Seal 11/1/17 BLUEBIRD C 6180198 BLUEBIRD CANYON DR CRESS ST ORIOLE DR C AC 2 11 898 38 41,268 5/26/26 73 47 6 47 Surface Treatment - Slurry Seal 11/1/17 EL TO 1000 EL TORO RD LAGUNA CANYON RD 73 SB OFF-RAMP B AC 2 5 3,835 38 165,875 5/26/26 98 0 0 100 Surface Treatment - Slurry Seal 5/22/24 EL TO 1001 EL TORO RD 73 SB OFF-RAMP ARTISAN DR B AC 3 5 1,565 32 60,755 5/26/26 100 0 0 0 Surface Treatment - Slurry Seal 5/22/24 EL TO 1002 EL TORO RD ARTISAN DR 73 SB OFF-RAMP B AC 3 5 1,565 32 65,470 5/26/26 100 0 0 0 Surface Treatment - Slurry Seal 5/22/24 EL TO 1003 EL TORO RD N CITY LIMIT ARTISAN DR B AC 0 5 1,549 36 55,764 5/26/26 100 0 100 0 Surface Treatment - Slurry Seal 5/22/24 FORES 6130070 FOREST AV BEACH ST THIRD ST B AC 2 4 565 48 26,928 5/26/26 85 25 75 0 New Construction - AC 1/1/98 FORES 6130076 FOREST AV COAST HY BEACH ST C AC 1 4 626 48 27,585 5/26/26 87 21 37 42 New Construction - AC 1/1/03 FORES 6130089 FOREST AV THIRD ST BROADWAY B AC 2 4 556 48 30,180 5/26/26 72 36 38 26 New Construction - AC 1/1/10 GLENN 6130073 GLENNEYRE ST PARK AV FOREST AV C AAC 2 4 426 38 17,145 5/26/26 100 0 100 0 Overlay - AC Structural 5/22/25 GLENN 6180052 GLENNEYRE ST LAGUNA AV LEGION ST C AAC 4 3 752 40 29,665 5/26/26 100 0 100 0 Overlay - AC Structural 5/22/25 GLENN 6180056 GLENNEYRE ST CLEO ST LEGION ST C AAC 4 3 983 37 36,846 5/26/26 92 31 69 0 Overlay - AC Structural 5/22/25 GLENN 6180091 GLENNEYRE ST THALIA ST CLEO ST C AAC 4 3 702 55 38,724 5/26/26 93 0 100 0 Overlay - AC Structural 5/22/25 GLENN 6180434 GLENNEYRE ST BROOKS ST THALIA ST B AC 4 13 1,109 54 60,935 5/26/26 68 84 14 2 New Construction - AC 1/1/93 GLENN 6180477 GLENNEYRE ST CALLIOPE ST BROOKS ST C AC 4 10 1,076 55 59,206 5/26/26 83 59 41 0 Surface Treatment - Slurry Seal 11/1/16 GLENN 6180500 GLENNEYRE ST BLUEBIRD CANYON RD CALLIOPE ST B AC 2 10 506 36 18,660 5/26/26 77 46 48 6 Surface Treatment - Slurry Seal 11/1/16 GLENN 6180660 GLENNEYRE ST CENTER ST BLUEBIRD CANYON DR C AC 2 10 969 36 36,645 5/26/26 78 13 6 81 Surface Treatment - Slurry Seal 11/1/20 GLENN 6180673 GLENNEYRE ST MOSS ST CENTER ST C AC 2 10 1,050 38 39,900 5/26/26 79 39 3 58 Surface Treatment - Slurry Seal 11/1/20 GLENN 6370744 GLENNEYRE ST MOSS ST UPLAND RD C AC 4 10 1,050 26 27,300 5/26/26 76 35 0 65 Surface Treatment - Slurry Seal 11/1/20 GLENN 6370745 GLENNEYRE ST UPLAND RD ALTA VISTA WY C AC 2 10 869 26 22,604 5/26/26 81 43 39 18 Surface Treatment - Slurry Seal 11/1/16
4.1 878,731
Locals
ACACIA DR 6130319 ACACIA DR LINDEN ST CLIFF DR E AC 2 6 653 36 23,508 4/5/22 80 66 23 11 Surface Treatment - Slurry Seal 5/22/25 ACAPULCO 6180352 ACAPULCO ST CORTEZ AV CAPISTRANO AV E AC 2 9 430 20 8,600 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 ACAPULCO 6180364 ACAPULCO ST ALISOS AV CORTEZ AV E AC 2 9 362 20 7,248 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 AGATE ST 6180416 AGATE ST COAST HWY OCEAN WY P AC 2 10 260 30 7,800 2/17/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/16 AGATE ST 6180613 AGATE ST NE END CATALINA ST E AC 2 10 845 36 30,420 2/10/22 92 0 88 12 Surface Treatment - Slurry Seal 11/1/20 AGATE ST 6180653 AGATE ST GLENNEYRE ST CATALINA ST E AC 2 10 714 30 10,493 2/10/22 90 0 65 35 Surface Treatment - Slurry Seal 11/1/20 ALEXANDER 6370641 ALEXANDER RD ASHTON DR END E AC 2 8 485 18 8,730 4/7/22 93 39 51 10 Surface Treatment - Slurry Seal 11/1/16 ALISOS AV 6370589 ALISOS AV QUIVERA ST END E AC 2 9 335 20 6,700 2/15/22 94 0 83 17 Surface Treatment - Slurry Seal 12/1/14 ALPINE WAY 6130160 ALPINE WAY MOUNTAIN VIEW DR CDS E AC 2 2 439 32 14,036 4/6/22 94 0 100 0 Surface Treatment - Slurry Seal 9/15/21 ALTA LAGUN 6130182 ALTA LAGUNA BLVD RIDGE DR END/TRAIL HEAD P AC 2 2 882 40 35,280 4/5/22 92 33 67 0 Surface Treatment - Slurry Seal 9/15/21 ALTA LAGUN 6130190 ALTA LAGUNA BLVD CRESTA WY PARK AV P AC 4 2 1,297 54 70,038 4/6/22 92 29 66 5 Surface Treatment - Slurry Seal 9/15/21 ALTA LAGUN 6130194 ALTA LAGUNA BLVD TEMPLE HILLS DR CRESTA WY P AC 4 2 728 54 39,312 4/6/22 92 32 68 0 Surface Treatment - Slurry Seal 9/15/21 ALTA LAGUN 6130196 ALTA LAGUNA BLVD CHILLON WY TEMPLE HILLS DR P AC 0 2 1,255 54 67,770 4/6/22 91 0 56 44 Surface Treatment - Slurry Seal 9/15/21 ALTA LAGUN 6130211 ALTA LAGUNA BLVD PARK AV RIDGE DR P AC 4 2 451 54 24,354 4/5/22 95 0 93 7 Surface Treatment - Slurry Seal 9/15/21 ALTA LAGUN 6130223 ALTA LAGUNA BLVD TEMPLE HILLS DR CHILLON WY P AC 2 2 610 38 23,180 4/6/22 91 0 93 7 Surface Treatment - Slurry Seal 9/15/21 ALTA LO 6370492 ALTA LOMA DR HOLLY DR CEANOTHUS DR P AC 0 1 493 16 7,888 2/18/22 80 0 47 53 Surface Treatment - Slurry Seal 10/1/19 ALTA VISTA 6370560 ALTA VISTA WAY QUEDA WY PALA WY C AC 2 8 242 16 3,871 4/8/22 92 0 100 0 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370569 ALTA VISTA WAY SOLANA WY END P AC 0 8 64 25 1,600 4/29/22 94 0 60 40 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370696 ALTA VISTA WAY NIDO WY LOMITA WY C AC 2 8 646 20 12,924 4/8/22 91 0 78 22 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370718 ALTA VISTA WAY LOMITA WY KILO WY C AC 2 8 807 20 16,140 4/8/22 89 0 70 30 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370724 ALTA VISTA WAY ENCINA WY DUARTE WY C AC 2 8 136 20 2,720 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370726 ALTA VISTA WAY IRIS WY ENCINA WY C AC 2 8 86 20 1,725 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370759 ALTA VISTA WAY CORONA WY BONITA WY C AC 2 8 176 20 3,518 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370766 ALTA VISTA WAY FONTANA WY IRIS WY C AC 2 8 120 20 2,398 2/15/22 88 0 100 0 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370768 ALTA VISTA WAY KILO WY FONTANA WY C AC 2 8 432 20 6,251 2/15/22 90 0 100 0 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370775 ALTA VISTA WAY DUARTE WY CORONA WY C AC 2 8 143 20 2,865 2/15/22 94 0 84 16 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370782 ALTA VISTA WAY GLENNEYRE ST QUEDA WY C AC 2 8 182 16 2,904 4/8/22 81 31 38 31 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370783 ALTA VISTA WAY HIGHLAND RD GLENNEYRE ST C AC 2 8 110 18 1,975 4/8/22 88 43 57 0 Surface Treatment - Slurry Seal 11/1/16 ALTA VISTA 6370790 ALTA VISTA WAY PALA WY NIDO WY C AC 2 8 481 14 3,396 4/8/22 87 43 53 4 Surface Treatment - Slurry Seal 11/1/16 ANACAPA WY 6130051 ANACAPA WY WEST END SKYLINE DR E AC 2 12 1,616 20 32,311 4/7/22 86 43 37 20 Surface Treatment - Slurry Seal 11/1/17 ANITA ST 6180027 ANITA ST CATALINA ST WILSON ST E AC 2 13 804 38 30,552 2/16/22 80 38 62 0 Surface Treatment - Slurry Seal 11/1/16 ANITA ST 6180111 ANITA ST WILSON ST TEMPLE TE E AC 2 13 665 38 25,279 2/10/22 79 56 22 22 Surface Treatment - Slurry Seal 11/1/16 ANITA ST 6180420 ANITA ST GAVIOTA DR COAST HY E AC 2 13 145 38 5,510 2/16/22 85 0 100 0 Surface Treatment - Slurry Seal 11/1/16 ANITA ST 6180421 ANITA ST COAST HY CATALINA ST E AC 2 13 566 38 21,508 4/8/22 67 80 18 2 Surface Treatment - Slurry Seal 11/1/16 ARCH ST 6370742 ARCH ST GLENNEYRE ST CATALINA ST C AC 2 10 120 38 4,560 4/7/22 88 41 51 8 Surface Treatment - Slurry Seal 11/1/20 ARCH ST 6370747 ARCH ST GLENNEYRE ST END E AC 2 10 310 38 6,688 4/7/22 86 20 75 5 Surface Treatment - Slurry Seal 11/1/20 ARROYO CHI 6180001 ARROYO CHICO CATALINA ST END P AAC 2 3 428 20 8,560 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 ARROYO DR 6130029 ARROYO DR CANYON ACRES DR NE END E AC 2 13 925 30 27,765 4/4/22 92 29 71 0 New Construction - AC 1/1/81 ASHTON DR 6370642 ASHTON DR ROUNSEVEL TE END E AC 2 8 294 18 4,235 4/7/22 86 20 76 4 Surface Treatment - Slurry Seal 11/1/16 ASTER ST 6130346 ASTER ST COAST HY CYPRESS DR E AC 2 6 322 36 11,592 4/7/22 83 85 15 0 Surface Treatment - Slurry Seal 5/22/25 ASTER ST 6130354 ASTER ST CYPRESS DR MONTEREY DR E AC 2 6 620 36 22,320 2/11/22 90 0 54 46 Surface Treatment - Slurry Seal 5/22/25 ASTER ST 6130375 ASTER ST MONTEREY DR HIGH DR E AC 2 6 740 36 26,652 2/11/22 94 0 100 0 Surface Treatment - Slurry Seal 5/22/25 ATLANTIC W 6130042 ATLANTIC WY CARIBBEAN WY END E AC 2 12 239 26 6,214 4/7/22 84 39 61 0 Surface Treatment - Slurry Seal 11/1/17 AVALON AV 6180030 AVALON AV ANITA ST SEAVIEW ST E AC 2 13 155 40 6,200 2/10/22 92 0 67 33 Surface Treatment - Slurry Seal 11/1/16 AVALON AV 6180041 AVALON AV SEAVIEW ST THALIA ST E AC 2 13 205 34 6,968 2/16/22 94 0 80 20 New Construction - AC 1/1/10 AVALON AV 6180119 AVALON AV SEAVIEW ST SE SEAVIEW ST NW E AC 2 13 50 36 1,800 2/16/22 94 0 100 0 New Construction - AC 1/1/10 BAJA ST 6180545 BAJA ST CAPISTRANO AV END (N) E AC 2 9 660 25 16,500 2/15/22 75 73 25 2 Surface Treatment - Slurry Seal 12/1/14 BAJA ST 6180561 BAJA ST END (S) CAPISTRANO AV E AC 2 9 459 25 10,750 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BAJA ST 6180574 BAJA ST SUMMIT DR S END P AC 2 9 227 30 6,810 2/16/22 93 0 100 0 New Construction - AC 1/1/80
33 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date BALBOA AV 6180318 BALBOA AV BARRACUDA WY CORTEZ AV C AC 2 9 502 36 14,764 2/15/22 91 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BALBOA AV 6180378 BALBOA AV CORTEZ AV CAPISTRANO AV C AC 2 9 430 36 15,479 2/15/22 78 67 33 0 Surface Treatment - Slurry Seal 12/1/14 BALBOA AV 6180379 BALBOA AV CAPISTRANO AV DEL MAR AVE E AC 2 9 430 36 18,220 2/15/22 77 0 62 38 Surface Treatment - Slurry Seal 12/1/14 BALBOA AV 6370717 BALBOA AV NYES PL KENDAL DR C AC 2 9 493 36 17,748 2/15/22 86 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BALBOA AV 6370735 BALBOA AV KENDAL DR BOLSANA DR C AC 2 9 1,056 36 38,011 2/15/22 84 0 68 32 Surface Treatment - Slurry Seal 12/1/14 BALBOA AV 6370764 BALBOA AV BOLSANA DR BARRACUDA WY C AC 2 9 303 36 10,913 2/15/22 87 40 60 0 Surface Treatment - Slurry Seal 12/1/14 BARRACUDA 6370689 BARRACUDA WY SOUTH END BALBOA AV E AC 2 9 640 32 24,864 4/29/22 78 41 54 5 Surface Treatment - Slurry Seal 12/1/14 BAYVIEW PL 6180180 BAYVIEW PL TEMPLE HILLS DR NORTH END E AC 2 8 826 18 16,317 4/6/22 85 62 36 2 Surface Treatment - Slurry Seal 12/1/14 BEACH ST 6130080 BEACH ST BROADWAY OCEAN AV E AC 4 4 271 48 13,029 4/7/22 93 0 100 0 New Construction - AC 1/1/06 BEACH ST 6130082 BEACH ST OCEAN AV FOREST AV E AC 2 4 257 36 9,267 4/7/22 94 0 100 0 New Construction - AC 1/1/10 BEACH ST 6130267 BEACH ST LOWER CLIFF DR BROADWAY C AC 0 6 282 40 11,280 4/7/22 90 48 52 0 Surface Treatment - Slurry Seal 5/22/25 BENT ST 6130104 BENT ST PARK AV END E AAC 2 4 385 46 17,710 4/13/22 100 0 0 0 Overlay - AC Structural 4/13/22 BERMUDA DR 6130011 BERMUDA DR CORONADO DR NORTH END E AC 2 12 445 24 10,682 4/7/22 97 0 85 15 Surface Treatment - Slurry Seal 11/1/17 BERN C 6130170 BERN CT PARK AV END P AC 2 2 245 22 5,390 4/5/22 90 0 100 0 Surface Treatment - Slurry Seal 9/15/21 BERN DR 6130214 BERN DR PARK AV SW PARK AV NE E AC 2 2 1,833 28 51,318 4/5/22 89 0 98 2 Surface Treatment - Slurry Seal 9/15/21 BERNARD CT 6130167 BERNARD CT ZELL DR END E AC 2 2 524 22 11,537 4/6/22 91 0 94 6 Surface Treatment - Slurry Seal 9/15/21 BEVERLY ST 6130461 BEVERLY ST COAST HY HILLCREST DR E AC 2 7 602 30 18,068 2/14/22 89 0 100 0 New Construction - AC 1/1/10 BLUEBIRD C 6180207 BLUEBIRD CANYON DR MADISON PL HALL PL C AC 2 11 496 26 12,896 2/16/22 74 64 36 0 New Construction - AC 1/1/04 BLUEBIRD C 6180210 BLUEBIRD CANYON DR BLUEBIRD CANYON / REGATTA RD JEFFERSON WY C AC 2 11 472 28 13,228 2/16/22 72 68 23 9 New Construction - AC 1/1/09 BLUEBIRD C 6180211 BLUEBIRD CANYON DR JEFFERSON WY MADISON PL C AC 2 11 429 28 2,727 2/16/22 72 44 53 3 New Construction - AC 1/1/10 BLUEBIRD C 6180216 BLUEBIRD CANYON DR HALL PL REGATTA RD C AC 2 11 1,188 26 30,883 2/16/22 92 0 47 53 New Construction - AC 1/1/10 BLUEBIRD C 6180218 BLUEBIRD CANYON DR KELLER WY BLUEBIRD CANYON / REGATTA RD C AC 2 11 378 28 6,047 2/16/22 89 0 100 0 Surface Treatment - Slurry Seal 11/1/16 BLUEBIRD C 6180220 BLUEBIRD CANYON DR EASTMAN WY KELLER WY C AC 2 11 622 32 7,642 2/16/22 91 56 44 0 Surface Treatment - Slurry Seal 11/1/16 BLUEBIRD C 6180244 BLUEBIRD CANYON DR RANCHO LAGUNA RD CHAMBERLIN WY C AC 2 11 570 42 6,013 2/16/22 79 60 26 14 Surface Treatment - Slurry Seal 11/1/16 BLUEBIRD C 6180256 BLUEBIRD CANYON DR ORIOLE DR RANCHO LAGUNA RD C AC 2 11 1,518 38 32,717 2/16/22 87 53 47 0 Surface Treatment - Slurry Seal 11/1/17 BLUEBIRD C 6180497 BLUEBIRD CANYON DR COAST HY CARMALITA ST C AC 2 10 1,026 38 31,000 2/10/22 93 0 77 23 Surface Treatment - Slurry Seal 11/1/16 BLUEBIRD C 6180505 BLUEBIRD CANYON DR CARMALITA ST SUMMIT DR C AC 2 10 680 38 15,450 2/10/22 92 0 42 58 Surface Treatment - Slurry Seal 11/1/20 BLUMONT ST 6130094 BLUMONT ST PARK AV END E AC 2 12 823 32 26,336 4/8/22 89 21 41 38 Surface Treatment - Slurry Seal 11/1/17 BOAT CANYO 6130471 BOAT CANYON DR COAST HY HILLCREST DR E AC 2 7 681 34 23,169 2/14/22 81 0 76 24 New Construction - AC 1/1/09 BOLSA02 7000030 BOLSA WY CUPRIEN WAY END E AAC 0 3 271 30 8,130 4/29/22 81 49 16 35 Overlay - AC Structural 1/1/22 BOLSA 6370690 BOLSANA WAY END LORETTA DR E AC 2 9 549 20 12,230 4/29/22 92 0 15 85 New Construction - AC 1/1/09 BOLSA 6370736 BOLSANA WAY LORETTA DR BALBOA AV E AC 2 9 870 32 27,840 4/29/22 94 0 72 28 New Construction - AC 1/1/09 BONITA WY 6370711 BONITA WY END (W) END (E) E AC 2 8 305 25 8,550 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BONN DR 6130208 BONN DR MOUNTAIN VIEW DR TYROL DR E AC 2 2 1,108 40 44,314 4/5/22 96 0 100 0 Surface Treatment - Slurry Seal 9/15/21 BONVUE TE 6130278 BONVUE TE HIGH DR NORTH END E AC 2 6 456 24 10,947 4/5/22 90 24 37 39 Surface Treatment - Slurry Seal 5/22/25 BOUNTY WY 6130001 BOUNTY WY PACIFIC AV EAST END E AC 2 12 466 24 11,192 4/7/22 96 60 23 17 Surface Treatment - Slurry Seal 11/1/17 BOUNTY WY 6130006 BOUNTY WY PACIFIC AV NW END E AC 2 12 240 24 5,750 4/7/22 98 0 51 49 Surface Treatment - Slurry Seal 11/1/17 BRANGWYM W 6180513 BRANGWYM WY CRESS ST BROOKS ST E AC 2 13 371 34 12,605 4/29/22 89 84 16 0 New Construction - AC 1/1/10 BRIDGE DR 6130176 BRIDGE DR HILLVIEW DR END E AC 2 2 406 24 9,738 4/7/22 91 0 100 0 Surface Treatment - Slurry Seal 9/15/21 BROADWAY P 6130269 BROADWAY PL COAST HY BROADWAY E AC 2 4 926 16 14,823 4/7/22 69 58 29 13 New Construction - AC 1/1/01 BROOKS ST 6180429 BROOKS ST COAST HY CATALINA ST E AC 2 13 565 40 22,600 2/10/22 94 0 100 0 New Construction - AC 1/1/10 BROOKS ST 6180431 BROOKS ST COAST HY OCEAN FRONT E AC 2 13 264 40 10,560 2/16/22 95 0 100 0 New Construction - AC 1/1/10 BROOKS ST 6180514 BROOKS ST CATALINA ST TEMPLE TERR E AC 2 13 1,226 58 71,108 2/10/22 90 0 100 0 New Construction - AC 1/1/08 BROOKS ST 6370529 BROOKS ST PEDRO ST SE PEDRO ST NW E AC 2 1 1,250 24 30,000 2/18/22 87 0 30 70 Surface Treatment - Slurry Seal 10/1/19 BROOKS ST 6370531 BROOKS ST MONTEREY ST PEDRO ST E AC 2 1 491 28 13,740 2/18/22 91 0 72 28 Surface Treatment - Slurry Seal 10/1/19 BROOKS ST 6370551 BROOKS ST BROOKS ST N PEDRO ST E AC 2 1 520 24 12,487 2/18/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 BROWNCROFT 6180145 BROWNCROFT RD ST ANNS DR GRIFFITH WY E AAC 2 3 314 28 8,793 4/29/22 81 54 32 14 Overlay - AC Structural 1/1/22 BUENA VIST 6130179 BUENA VISTA WY CANYON VIEW DR NORTH END E AC 2 8 1,255 26 32,617 4/6/22 68 71 10 19 Surface Treatment - Slurry Seal 12/1/14 CAJON 6130506 CAJON ST HILLCREST DR NE END E AC 2 7 219 18 3,937 2/11/22 87 0 100 0 New Construction - AC 1/1/00 CAJON 6130575 CAJON ST COAST HY HILLCREST DR E AC 2 7 620 34 21,080 2/14/22 94 0 100 0 New Construction - AC 1/1/95 CALLIOPE S 6180470 CALLIOPE ST TEMPLE TERR END E AC 2 10 603 42 25,326 2/10/22 94 0 90 10 Surface Treatment - Slurry Seal 11/1/16 CALLIOPE S 6180482 CALLIOPE ST COAST HY CATALINA ST E AC 2 10 566 42 23,772 2/10/22 94 0 72 28 Surface Treatment - Slurry Seal 11/1/16 CAMDE 6130503 CAMDEN PL NW END DARTMOOR ST E AC 2 7 441 28 12,350 2/11/22 92 0 58 42 New Construction - AC 1/1/89 CANYO 6130031 CANYON ACRES DR LEWIS LN EAST END E AC 2 13 2,580 30 46,170 4/4/22 91 25 44 31 New Construction - AC 1/1/85 CANYO 6130135 CANYON ACRES DR LAGUNA CANYON RD LEWELLYN DR E AC 2 13 953 38 36,214 4/4/22 92 34 47 19 New Construction - AC 1/1/93 CANYON VIE 7000002 CANYON VIEW DR TEMPLE HILLS DR BUENA VISTA DR E AC 2 8 1,158 30 34,740 4/6/22 63 83 14 3 Surface Treatment - Slurry Seal 12/1/14 CANYON VIE 7000003 CANYON VIEW DR BUENA VISTA DR END E AC 0 8 741 30 22,230 4/6/22 78 56 32 12 New Construction - AC 1/1/90 CAPIS 6180349 CAPISTRANO AV QUIVERA ST ACAPULCO ST E AC 1 9 230 20 5,980 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180351 CAPISTRANO AV ACAPULCO ST SANTA ANA ST E AC 1 9 230 20 5,980 2/15/22 84 69 29 2 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180353 CAPISTRANO AV SANTA ANA ST TIA JUANA ST E AC 1 9 230 20 5,980 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180355 CAPISTRANO AV TIA JUANA ST BALBOA AV E AC 1 9 247 20 6,420 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180532 CAPISTRANO AV NORIA ST ORO ST E AC 2 9 230 25 5,750 2/15/22 81 62 38 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180538 CAPISTRANO AV MIRAMAR ST NORIA ST E AC 2 9 230 25 5,750 2/15/22 99 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180549 CAPISTRANO AV LA MIRADA ST MIRAMAR ST E AC 2 9 230 25 5,750 2/15/22 93 37 63 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180551 CAPISTRANO AV KATELLA ST LA MIRADA ST E AC 2 9 230 25 5,750 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180553 CAPISTRANO AV BAJA ST KATELLA ST E AC 2 9 230 25 6,440 2/15/22 86 51 49 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180556 CAPISTRANO AV SAN JOSE ST BAJA ST E AC 2 9 230 25 6,440 2/15/22 84 44 56 0 Surface Treatment - Slurry Seal 12/1/14 CARIB 6130038 CARIBBEAN WY CORAL DR ATLANTIC WY E AC 2 12 1,144 34 38,896 4/7/22 89 25 75 0 Surface Treatment - Slurry Seal 11/1/17 CARIB 6130040 CARIBBEAN WY ATLANTIC WY TAHITI AV E AC 2 12 508 34 17,273 4/7/22 89 24 73 3 Surface Treatment - Slurry Seal 11/1/17 CARME 6180467 CARMELITA ST CALLIOPE ST CRESS ST E AC 2 10 673 28 18,844 2/10/22 92 0 63 37 Surface Treatment - Slurry Seal 11/1/16 CARME 6180691 CARMELITA ST CENTER ST BLUEBIRD CANYON DR E AC 2 10 985 36 35,460 2/11/22 94 0 90 10 Surface Treatment - Slurry Seal 11/1/20 CATAL 6180042 CATALINA ST THALIA ST CLEO ST E AAC 2 3 860 50 43,000 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 CATAL 6180045 CATALINA ST LEGION ST PARK AV E AAC 2 3 586 36 21,106 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22
34 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date CATAL 6180064 CATALINA ST CLEO ST LEGION ST P AAC 0 3 904 50 45,200 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 CATAL 6180417 CATALINA ST BLUEBIRD CANYON DR PALMER PL E AC 2 10 225 28 6,307 2/10/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/16 CATAL 6180463 CATALINA ST CALLIOPE ST BROOKS ST E AC 2 10 1,031 44 45,364 2/10/22 93 0 77 23 Surface Treatment - Slurry Seal 11/1/16 CATAL 6180516 CATALINA ST BROOKS ST THALIA ST E AC 2 13 1,129 44 49,676 2/10/22 85 73 27 0 New Construction - AC 1/1/03 CATAL 6180658 CATALINA ST OSGOOD CT BLUEBIRD CANYON DR E AC 2 10 1,500 34 51,000 2/10/22 89 0 44 56 Surface Treatment - Slurry Seal 11/1/20 CATAL 6180702 CATALINA ST MOSS ST OSGOOD CT E AC 2 10 510 38 19,380 2/10/22 91 0 67 33 Surface Treatment - Slurry Seal 11/1/16 CATAL 6370415 CATALINA ST MONTEREY ST WEST ST E AC 2 1 650 30 19,489 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 CATAL 6370417 CATALINA ST COAST HY MONTEREY ST E AC 2 1 165 34 5,616 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 CATEA 6130224 CATEAU WY ZELL DR ALTA LAGUNA BL E AC 2 2 457 36 16,463 4/6/22 95 0 100 0 Surface Treatment - Slurry Seal 9/15/21 CATEA 6130225 CATEAU WY ZELL DR CHILLON WY E AC 2 2 846 36 30,470 4/6/22 94 0 91 9 Surface Treatment - Slurry Seal 9/15/21 CEANO 6370475 CEANOTHUS DR ALTA LOMA DR NW END E AC 4 1 1,670 28 46,751 2/18/22 93 0 54 46 Surface Treatment - Slurry Seal 10/1/19 CEDAR 6130352 CEDAR WY JASMINE ST ASTER ST E AC 2 6 640 24 15,360 4/5/22 65 72 20 8 Surface Treatment - Slurry Seal 5/22/25 CEDAR 6130379 CEDAR WY HIGH DR JASMINE ST E AC 2 6 1,094 28 30,632 4/5/22 90 22 45 33 Surface Treatment - Slurry Seal 5/22/25 CEDAR 6130434 CEDAR WY ASTER ST ACACIA ST E AC 2 6 1,477 18 26,586 4/5/22 63 77 15 8 Surface Treatment - Slurry Seal 5/22/25 CENTE 6180665 CENTER ST CATALINA ST CARMELITA ST E AC 2 10 363 48 17,424 2/10/22 89 0 30 70 Surface Treatment - Slurry Seal 11/1/20 CENTE 6180668 CENTER ST COAST HY CATALINA ST E AC 2 10 675 48 32,400 2/11/22 93 0 90 10 Surface Treatment - Slurry Seal 11/1/20 CENTE 6180696 CENTER ST CARMELITA ST PEARL ST E AC 2 10 545 30 16,344 2/10/22 89 0 36 64 Surface Treatment - Slurry Seal 11/1/20 CERRT 6180177 CERRTOS DR TERRACE WY EAST END E AC 2 8 390 34 13,249 4/6/22 84 59 39 2 Surface Treatment - Slurry Seal 12/1/14 CERRT 6180200 CERRTOS DR TEMPLE HILLS DR TERRACE WY E AC 2 8 428 34 14,562 4/6/22 76 50 44 6 Surface Treatment - Slurry Seal 12/1/14 CERRT 6180204 CERRTOS DR TERRACE WY SW TERRACE WY NE E AC 2 8 1,542 34 52,429 4/6/22 78 42 35 23 Surface Treatment - Slurry Seal 12/1/14 CHILL 6130221 CHILLON WY ALTA LAGUNA BL CATEAU WY E AC 2 2 965 36 34,729 4/6/22 91 0 50 50 Surface Treatment - Slurry Seal 9/15/21 CHILL 6130226 CHILLON WY ZELL DR CATEAU WY E AC 2 2 543 36 19,534 4/6/22 93 0 100 0 Surface Treatment - Slurry Seal 9/15/21 CHIQU 6130570 CHIQUITA ST COAST HY HEATHER PL E AC 2 7 620 34 21,080 2/14/22 95 0 100 0 New Construction - AC 1/1/82 CHIQU 6130733 CHIQUITA ST CLIFF DR COAST HY E AC 2 7 513 32 16,404 2/17/22 87 0 29 71 New Construction - AC 1/1/07 CIRCL 6130763 CIRCLE WY CIRCLE WY @E WYE CLIFF DR E AC 1 7 77 38 2,907 2/15/22 92 0 45 55 New Construction - AC 1/1/82 CIRCL 6130764 CIRCLE WY CIRCLE WY @S WYE CIRCLE WY @E WYE E AC 1 7 343 28 9,606 2/15/22 81 0 59 41 New Construction - AC 1/1/84 CIRCL 6130765 CIRCLE WY CIRCLE WY @E WYE CIRCLE WY @N WYE E AC 1 7 381 28 10,668 2/15/22 76 54 40 6 New Construction - AC 1/1/91 CIRCL 6130766 CIRCLE WY CIRCLE WY @S WYE CIRCLE WY @N WYE E AC 1 7 293 28 8,208 2/15/22 89 0 34 66 New Construction - AC 1/1/85 CLEO 6180081 CLEO ST SLEEPY HOLLOW LN COAST HY E AAC 2 3 277 52 14,404 5/22/22 100 0 0 0 Overlay - AC Structural 5/22/22 CLEO 6180084 CLEO ST COAST HY GLENNEYRE ST E AC 2 3 348 36 12,528 2/17/22 81 13 31 56 New Construction - AC 1/1/77 CLEO 6180136 CLEO ST GLENNEYRE ST CATALINA ST E AAC 2 3 342 28 9,571 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 CLIFF 6130332 CLIFF DR ROSA BONHEUR BROADWAY P AC 1 6 819 48 39,312 4/5/22 71 49 33 18 Surface Treatment - Slurry Seal 5/22/25 CLIFF 6130340 CLIFF DR MYRTLE ST JASMINE ST P AC 2 7 697 48 33,456 2/17/22 93 0 100 0 New Construction - AC 1/1/80 CLIFF 6130344 CLIFF DR ASTER ST ROSA BONHEUR P AC 2 6 1,086 48 52,128 4/5/22 73 31 59 10 Surface Treatment - Slurry Seal 5/22/25 CLIFF 6130410 CLIFF DR JASMINE ST COAST HY P AC 0 7 893 42 37,506 2/17/22 87 0 100 0 New Construction - AC 1/1/80 CLIFF 6130432 CLIFF DR HIGH DR MYRTLE ST P AC 2 7 625 42 26,250 2/17/22 70 76 9 15 New Construction - AC 1/1/80 CLIFF 6130443 CLIFF DR BEVERLY ST HIGH DR P AC 2 7 839 42 35,238 2/17/22 90 0 100 0 New Construction - AC 1/1/80 CLIFF 6130741 CLIFF DR CLIFF DR COAST HY P AC 2 7 308 30 9,240 2/17/22 88 0 58 42 New Construction - AC 1/1/80 CLIFF 6130744 CLIFF DR CIRCLE WY BEVERLY ST P AC 0 7 1,540 42 64,680 2/17/22 91 0 74 26 New Construction - AC 1/1/80 CLIFF 6130758 CLIFF DR CIRCLE WY COAST HY P AC 0 7 408 32 13,056 2/15/22 85 44 31 25 New Construction - AC 1/1/80 COAST VIEW 7000001 COAST VIEW DR TEMPLE HILLS DR END E AC 2 8 2,009 30 60,270 4/29/22 81 90 10 0 Surface Treatment - Slurry Seal 12/1/14 CORAL 6130018 CORAL DR PACIFIC AV NW END E AC 2 12 367 24 8,811 4/7/22 98 0 45 55 Surface Treatment - Slurry Seal 11/1/17 CORAL 6130037 CORAL DR PACIFIC AV END E AC 2 12 887 28 24,836 4/7/22 93 34 58 8 Surface Treatment - Slurry Seal 11/1/17 CORON WY 6370781 CORONA WY FONTANA WY END P AC 0 8 276 30 8,280 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 CORON 6130050 CORONADO DR SKYLINE DR END P AC 2 12 924 26 24,024 4/7/22 91 22 31 47 Surface Treatment - Slurry Seal 11/1/17 CORTE 6180361 CORTEZ AV QUIVERA ST ACAPULCO ST E AC 1 9 230 20 4,600 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180363 CORTEZ AV ACAPULCO ST SANTA ANA ST E AC 1 9 230 20 4,600 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180365 CORTEZ AV SANTA ANA ST TIA JUANA ST E AC 1 9 230 20 4,600 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180367 CORTEZ AV TIA JUANA ST BALBOA AV E AC 1 9 251 20 5,017 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180539 CORTEZ AV KATELLA ST LA MIRADA ST E AC 2 9 230 28 6,440 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180541 CORTEZ AV LA MIRADA ST MIRAMAR ST E AC 2 9 230 22 5,060 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180559 CORTEZ AV BAJA ST KATELLA ST E AC 2 9 230 22 4,268 2/15/22 88 44 56 0 Surface Treatment - Slurry Seal 12/1/14 CRESC 6130705 CRESCENT BAY DR COAST HY CRESCENT BAY DR E AC 2 7 718 28 20,104 2/14/22 88 0 68 32 New Construction - AC 1/1/89 CRESC 6130714 CRESCENT BAY DR CRESCENT BAY DR @E WYE EAST END E AC 2 7 182 22 4,015 2/15/22 91 0 100 0 New Construction - AC 1/1/80 CRESC 6130715 CRESCENT BAY DR EAST END CRESCENT BAY DR @S WYE E AC 2 7 276 30 8,274 2/14/22 86 0 51 49 New Construction - AC 1/1/87 CRESC 6130730 CRESCENT BAY DR CRESCENT BAY DR @E WYE CRESCENT BAY DR @N WYE E AC 2 7 461 30 13,825 2/14/22 86 0 100 0 New Construction - AC 1/1/90 CRESC 6130731 CRESCENT BAY DR CRESCENT BAY DR @S WYE CRESCENT BAY DR @E WYE E AC 2 7 339 30 10,156 2/14/22 96 0 100 0 New Construction - AC 1/1/90 CRESS 6180448 CRESS ST COAST HY CATALINA ST C AC 2 13 569 40 22,760 2/10/22 94 0 100 0 New Construction - AC 1/1/94 CRESS 6180453 CRESS ST CATALINA ST BRANGWYM WY C AC 2 13 771 40 30,840 2/10/22 92 0 69 31 New Construction - AC 1/1/05 CRESS 6180494 CRESS ST COAST HY END C AC 2 13 209 42 8,778 2/16/22 95 0 100 0 New Construction - AC 1/1/85 CRESS 6180512 CRESS ST BRANGWYN WY BLUEBIRD CANYON DR C AC 2 13 1,086 40 43,440 2/16/22 88 34 47 19 New Construction - AC 1/1/10 CRESTA 6130193 CRESTA WY TEMPLE HILLS DR ALTA LAGUNA BLVD P AC 2 2 922 34 31,348 4/6/22 95 0 100 0 Surface Treatment - Slurry Seal 9/15/21 CREST 6180615 CRESTVIEW DR FERN ST NORTH END E AC 2 11A 781 24 18,752 4/7/22 81 12 14 74 Surface Treatment - Slurry Seal 5/22/24 CREST 6180616 CRESTVIEW DR CRESTVIEW PL FERN ST E AC 2 11A 508 32 20,288 2/11/22 82 0 36 64 Surface Treatment - Slurry Seal 5/22/24 CREST 6180708 CRESTVIEW DR CRESTVIEW PL DIAMOND ST E AC 2 11A 1,193 18 19,566 2/11/22 81 0 56 44 Surface Treatment - Slurry Seal 5/22/24 CREST PL 6180707 CRESTVIEW PL CRESTVIEW DR END P AC 2 11A 913 20 18,260 4/7/22 82 23 38 39 Surface Treatment - Slurry Seal 5/22/24 CRESTW 6130172 CRESTWOOD CL RIDGE DR END P AC 2 2 236 32 7,552 4/5/22 95 0 100 0 Surface Treatment - Slurry Seal 9/15/21 CUMMINGS P 6180138 CUMMINGS PL SEAVIEW ST ANITA ST P AC 2 13 155 30 4,650 2/16/22 95 0 100 0 New Construction - AC 1/1/80 CUPRI 6180016 CUPRIEN WY THALIA ST WENDT TERR E AAC 2 3 635 28 17,780 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 CYPRE 6130311 CYPRESS DR HIGH DR JASMINE DR C AC 2 6 1,003 36 36,108 2/14/22 73 61 33 6 Surface Treatment - Slurry Seal 5/22/25 CYPRE 6130350 CYPRESS DR JASMINE ST ACACIA DR C AC 2 6 1,882 36 67,752 2/14/22 73 54 13 33 Surface Treatment - Slurry Seal 5/22/25 DARTM 6130536 DARTMOOR ST DUNNEGAN DR EAST END E AC 2 7 142 36 5,111 2/11/22 93 0 59 41 New Construction - AC 1/1/03 DARTM 6130557 DARTMOOR ST HILLCREST DR CAMDEN PL E AC 2 7 715 36 25,746 2/11/22 86 0 28 72 New Construction - AC 1/1/85
35 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date DARTM 6130558 DARTMOOR ST CAMDEN PL DUNNEGAN DR E AC 2 7 651 36 23,427 2/11/22 85 0 48 52 New Construction - AC 1/1/08 DAVIS 6370683 DAVIS WY SOUTH END NORTH END E AC 2 9 410 20 11,480 2/18/22 94 0 92 8 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180324 DEL MAR AV NORIA ST ORO ST C AC 2 9 230 25 5,750 2/15/22 76 68 32 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180325 DEL MAR AV MIRAMAR ST NORIA ST C AC 2 9 230 25 5,750 2/15/22 84 72 28 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180329 DEL MAR AV KATELLA ST LA MIRADA ST C AC 2 9 230 25 5,750 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180331 DEL MAR AV LA MIRADA ST MIRAMAR ST C AC 2 9 230 25 5,750 2/15/22 92 0 87 13 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180338 DEL MAR AV ORO ST SANTA ANA ST C AC 2 9 920 36 33,120 2/15/22 89 0 100 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180340 DEL MAR AV SANTA ANA ST TIA JUANA ST C AC 2 9 230 36 8,280 2/15/22 88 0 100 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180342 DEL MAR AV TIA JUANA ST BALBOA ST C AC 2 9 242 36 8,727 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180543 DEL MAR AV BAJA ST KATELLA ST C AC 2 9 230 25 5,750 2/15/22 83 48 46 6 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180544 DEL MAR AV END BAJA ST C AC 2 9 230 25 5,725 2/15/22 91 0 100 0 Surface Treatment - Slurry Seal 12/1/14 DIAMO 6180619 DIAMOND ST S END SUMMIT DR C AC 2 11 1,022 20 20,447 2/16/22 92 0 85 15 Surface Treatment - Slurry Seal 11/1/17 DIAMO 6180637 DIAMOND ST COAST HY CATALINA ST C AC 2 10 712 38 27,056 2/11/22 95 0 90 10 Surface Treatment - Slurry Seal 11/1/20 DIAMO 6180640 DIAMOND ST COAST HY OCEAN WY C AC 2 10 230 38 8,740 2/17/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/16 DIAMO 6180674 DIAMOND ST CATALINA ST CRESTVIEW DR C AC 2 10 850 26 22,092 2/11/22 79 54 12 34 Surface Treatment - Slurry Seal 11/1/20 DIAMO 6180710 DIAMOND ST CRESTVIEW DR END C AC 2 11A 1,181 34 40,154 2/11/22 89 43 32 25 Surface Treatment - Slurry Seal 5/22/24 DOLPH 6130468 DOLPHIN WY SW END HILLCREST DR E AC 2 7 468 22 10,293 2/14/22 81 83 17 0 New Construction - AC 1/1/09 DONNA 6130248 DONNA DR SAN REMO DR END E AC 2 8 142 22 3,130 4/6/22 81 59 41 0 New Construction - AC 1/1/71 DORN 6130162 DORN CT TEMPLE HILLS DR END E AC 2 2 96 40 3,826 4/6/22 98 0 100 0 Surface Treatment - Slurry Seal 9/15/21 DORN 6130180 DORN CT SOUTH END TEMPLE HILLS DR E AC 2 2 558 28 15,634 4/6/22 88 0 16 84 Surface Treatment - Slurry Seal 9/15/21 DRIFT 6370609 DRIFTWOOD DR WESLEY DR OCEAN VIEW VISTA DR E AC 2 1A 628 26 16,315 4/8/22 88 0 45 55 Surface Treatment - Slurry Seal 11/1/20 DRIFT 6370612 DRIFTWOOD DR OCEAN VIEW VISTA DR NORTH END E AC 2 1A 544 26 14,132 4/8/22 86 0 39 61 Surface Treatment - Slurry Seal 11/1/20 DUART 6370776 DUARTE WY W END FONTANA WY E AC 2 8 308 26 7,999 4/8/22 98 0 52 48 Surface Treatment - Slurry Seal 11/1/16 DUART 6370778 DUARTE WY FONTANA WY E END E AC 2 8 102 20 2,040 4/8/22 97 0 100 0 Surface Treatment - Slurry Seal 11/1/16 DUMON 6370627 DUMOND DR OCEAN FRONT WARDS TE E AC 2 8 190 12 2,280 4/29/22 90 0 6 94 Surface Treatment - Slurry Seal 11/1/16 DUMON 6370637 DUMOND DR WARDS TE MARION WY E AC 2 8 202 34 6,873 4/29/22 96 0 34 66 Surface Treatment - Slurry Seal 11/1/16 DUMON 6370668 DUMOND DR MARION WY VICTORIA DR E AC 2 8 344 34 11,683 4/29/22 88 60 7 33 Surface Treatment - Slurry Seal 11/1/16 DUNNE 6130502 DUNNEGAN DR NW END DUNNEGAN DR E AC 2 7 391 26 10,172 2/11/22 83 64 27 9 New Construction - AC 1/1/96 DUNNE 6130559 DUNNEGAN DR DARTMOOR ST WINDSOR PL E AC 2 7 731 26 19,006 2/11/22 90 0 41 59 New Construction - AC 1/1/84 DUNNI 6180175 DUNNING DR TEMPLE HILLS DR NE END E AC 2 8 1,898 22 41,750 4/6/22 100 0 0 0 Surface Treatment - Slurry Seal 12/1/14 DYER 6180239 DYER WY DYER WY MILLER WY E AC 2 11 611 12 7,332 2/16/22 100 0 0 0 Surface Treatment - Slurry Seal 11/1/16 DYER 6180262 DYER WY DYER PL MADISON PL E AC 0 11 175 14 2,445 2/16/22 100 0 0 0 Surface Treatment - Slurry Seal 11/1/16 EAGAN 6370412 EAGAN RD FIRST AV WEST ST E AC 2 1 224 28 6,269 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 EAGLE RK 6370365 EAGLE ROCK WY SCENIC DR MAR VISTA AV E AC 2 1 230 28 6,440 2/18/22 84 0 27 73 Surface Treatment - Slurry Seal 10/1/19 EAGLE RK 6370405 EAGLE ROCK WY COAST HY VIRGINIA WY E AC 2 1 200 32 6,400 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 EAGLE RK 6370408 EAGLE ROCK WY VIRGINIA WY SCENIC DR E AC 2 1 1,070 24 25,680 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 EIGHT 6370256 EIGHTH AV COAST HY VIRGINIA WY E AC 2 1 198 18 3,564 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 EIGHT 6370257 EIGHTH AV VIRGINIA WY SUNSET AV E AC 2 1 840 22 18,480 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 EL BO 6180151 EL BOSQUE CATALINA ST EL BOSQUE @WYE E AAC 2 3 796 34 27,064 2/17/22 93 0 100 0 Overlay - AC Structural 1/1/22 EL CA 6180053 EL CAMINO DEL MAR GLENNEYRE ST GOFF ST E AAC 2 3 341 34 11,594 2/17/22 95 0 100 0 Overlay - AC Structural 1/1/22 EL CA 6180094 EL CAMINO DEL MAR LOS ROBLES SHORT ST E AAC 2 3 730 34 24,820 2/17/22 90 51 49 0 Overlay - AC Structural 1/1/22 EL PA 6180008 EL PASEO ST NW END LAGUNA AV E AAC 0 0 215 26 5,590 5/1/22 100 0 0 0 Overlay - AC Structural 5/1/22 ELEAN 6130513 ELEANOR LN NW END PANORAMA DR E AC 2 7 359 24 8,610 2/14/22 94 0 100 0 New Construction - AC 1/1/87 ENCIN 6370725 ENCINA WY FONTANA WY END E AC 1 8 145 20 2,900 2/15/22 88 0 49 51 Surface Treatment - Slurry Seal 11/1/16 ENSEN 6180369 ENSENADA AV LA MIRADA ST NORIA ST E AC 2 9 440 20 8,800 2/15/22 90 0 100 0 Surface Treatment - Slurry Seal 12/1/14 FAIRV 6130550 FAIRVIEW ST COAST HY HILLCREST DR E AC 2 7 620 30 18,600 2/14/22 93 0 94 6 New Construction - AC 1/1/87 FAIRV 6130738 FAIRVIEW ST CLIFF DR COAST HY E AC 2 7 370 28 10,360 2/17/22 95 0 100 0 New Construction - AC 1/1/99 FAYET 6130514 FAYETTE PL PANORAMA DR EAST END E AC 2 7 227 26 5,913 2/14/22 93 0 100 0 New Construction - AC 1/1/84 FEN W 6180018 FEN WY CUPRIEN WY ST ANNS DR E AAC 2 3 316 22 6,947 4/29/22 78 0 26 74 Overlay - AC Structural 1/1/22 FIFTH 6370319 FIFTH AV SCENIC DR EAST END E AC 2 1 150 30 4,509 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 FIFTH 6370379 FIFTH AV COAST HY VIRGINIA WY E AC 2 1 200 38 7,602 2/18/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 FIFTH 6370381 FIFTH AV VIRGINIA WY SCENIC DR E AC 2 1 343 38 13,034 2/18/22 93 0 73 27 Surface Treatment - Slurry Seal 10/1/19 FIRST 6370317 FIRST AV MAR VISTA AVE SE END P AC 0 1 409 30 12,270 4/8/22 83 51 47 2 Surface Treatment - Slurry Seal 10/1/19 FLAMI 6180174 FLAMINGO RD ORIOLE DR END E AC 2 11 755 28 21,144 2/16/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/17 FLORA 6180664 FLORA ST GLENNEYRE ST CATALINA ST E AC 2 10 350 30 10,500 2/10/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 FLORA 6180684 FLORA ST CATALINA ST CARMELITA ST E AC 2 10 350 30 10,500 2/10/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 FLORA 6180689 FLORA ST CARMELITA ST SANTA CRUZ ST E AC 2 10 350 34 11,900 2/10/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 FONTA 6370563 FONTANA WY DUARTE WY CORONA WY E AC 2 8 125 30 3,762 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 FONTA 6370757 FONTANA WY CORONA WY BONITA WY E AC 2 8 121 30 3,643 2/15/22 93 0 59 41 Surface Treatment - Slurry Seal 11/1/16 FONTA 6370767 FONTANA WY ALTA VISTA WY ENCINA WY E AC 2 8 187 24 4,486 2/15/22 89 0 30 70 Surface Treatment - Slurry Seal 11/1/16 FOURT 6370395 FOURTH AV COAST HY VIRGINIA WY C AC 2 1 200 38 7,602 2/18/22 91 0 100 0 Surface Treatment - Slurry Seal 10/1/19 FOURT 6370399 FOURTH AV VIRGINIA WY SCENIC DR C AC 2 1 529 28 14,812 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 GAINS 6180617 GAINSBOROUGH DR SW END GAINSBOROUGH WY E AC 2 11A 610 22 13,420 4/29/22 87 0 29 71 Surface Treatment - Slurry Seal 5/22/24 GAINS 6180636 GAINSBOROUGH DR GAINSBOROUGH PL GAINSBOROUGH WY E AC 2 11A 186 32 5,948 4/29/22 91 0 43 57 Surface Treatment - Slurry Seal 11/1/20 GAINS 6180709 GAINSBOROUGH DR GAINSBOROUGH PL DIAMOND ST E AC 2 11A 520 22 11,431 4/29/22 89 0 41 59 Surface Treatment - Slurry Seal 5/22/24 GAINS PL 6180631 GAINSBOURGOUGH PL GAINSBOROUGH DR END P AC 2 11A 237 24 5,688 4/29/22 91 46 43 11 Surface Treatment - Slurry Seal 5/22/24 GALEN 6180495 GALEN DR BLUEBIRD CANYON DR END E AC 2 10 493 24 11,833 2/16/22 86 0 31 69 Surface Treatment - Slurry Seal 11/1/16 GAVIO 6180424 GAVIOTA DR BROOKS ST OAK ST E AC 2 13 1,025 36 36,900 2/16/22 94 0 88 12 New Construction - AC 1/1/80 GAVIO 6180492 GAVIOTA DR CRESS ST MOUNTAIN RD E AC 1 10 360 18 6,480 2/16/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 GAVIO 6180510 GAVIOTA DR CRESS ST BROOKS ST E AC 1 13 407 20 8,140 2/16/22 95 0 100 0 New Construction - AC 1/1/84 GOFF 6180047 GOFF ST LEGION ST EL CAMINO DEL MAR E AAC 2 3 570 24 13,680 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 GOFF 6180048 GOFF ST PARK AV LEGION ST E AAC 1 3 694 22 15,258 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 GOFF 6180107 GOFF ST LOS OLIVOS END E AAC 2 3 387 28 10,848 4/6/22 93 33 61 6 Overlay - AC Structural 4/1/22
36 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date GRACE 6180150 GRACELAND DR CATALINA ST WILSON ST E AC 2 3 590 34 20,046 2/10/22 94 0 76 24 New Construction - AC 1/1/84 GRAND 6130474 GRANDVIEW ST END HILLCREST DR E AC 2 7 442 32 14,144 2/14/22 94 0 100 0 New Construction - AC 1/1/06 GRIFF 6180004 GRIFFITH PL SOUTH END GRIFFITH WY E AAC 2 3 208 28 5,817 4/29/22 94 60 4 36 Overlay - AC Structural 1/1/22 GRIFF WY 6180005 GRIFFITH WY WENDT TERR END P AAC 0 3 747 31 23,157 4/29/22 90 56 19 25 Overlay - AC Structural 1/1/22 GULL 6370731 GULL CL DAVIS WY MARLIN DR E AC 2 9 266 25 7,448 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 HAROL 6130282 HAROLD DR WEST END POPLAR ST E AC 2 6 729 34 24,779 2/11/22 90 0 100 0 Surface Treatment - Slurry Seal 5/22/25 HAWTH 6130309 HAWTHORNE RD CYPRESS DR MONTEREY DR E AC 2 6 623 36 22,428 2/11/22 82 11 47 42 Surface Treatment - Slurry Seal 5/22/25 HAWTH 6130402 HAWTHORNE RD MONTEREY DR HIGH DR E AC 2 6 454 36 16,326 2/11/22 84 0 28 72 Surface Treatment - Slurry Seal 5/22/25 HEATH 6130505 HEATHER PL HILLCREST DR EAST END E AC 2 7 553 24 13,263 2/11/22 93 0 85 15 New Construction - AC 1/1/90 HERMO 6370769 HERMOSA WY IRIS WY N END E AC 1 8 120 18 2,160 4/8/22 71 0 81 19 Surface Treatment - Slurry Seal 11/1/16 HIGH 6130349 HIGH DR JASMINE ST POPLAR ST C AC 2 6 965 30 28,950 2/11/22 61 61 14 25 Surface Treatment - Slurry Seal 5/22/25 HIGH 6130373 HIGH DR MONTEREY DR JASMINE ST C AC 2 6 1,559 32 49,888 2/11/22 84 32 25 43 Surface Treatment - Slurry Seal 5/22/25 HIGH 6130380 HIGH DR COAST HY MONTEREY DR C AC 2 6 1,100 30 33,000 2/14/22 86 0 68 32 Surface Treatment - Slurry Seal 5/22/25 HIGH 6130397 HIGH DR CLIFF DR COAST HY C AC 2 7 310 24 5,880 2/14/22 100 0 0 0 New Construction - AC 1/1/83 HIGH 6130482 HIGH DR ACACIA DR POPLAR ST C AC 2 6 1,223 32 39,136 2/11/22 83 33 39 28 Surface Treatment - Slurry Seal 5/22/25 HIGHL RD 6370708 HIGHLAND RD SOLANA WY END P AC 0 8 349 30 11,040 4/29/22 84 48 25 27 Surface Treatment - Slurry Seal 11/1/16 HIGHL WY 6370709 HIGHLAND WY HIGHLAND RD WY NYES PL E AC 2 8 475 22 10,441 4/29/22 84 60 29 11 Surface Treatment - Slurry Seal 11/1/16 HILL 6130315 HILL LN ACACIA DR HIGH DR E AC 2 6 455 38 17,290 2/11/22 95 0 100 0 Surface Treatment - Slurry Seal 5/22/25 HILLC 6130464 HILLCREST DR BOAT CANYON DR PINECREST DR C AC 2 7 984 30 29,520 2/14/22 77 0 52 48 New Construction - AC 1/1/87 HILLC 6130573 HILLCREST DR CHIQUITA ST SAN JOAQUIN ST C AC 2 7 853 34 29,002 2/14/22 87 0 100 0 New Construction - AC 1/1/10 HILLC 6130584 HILLCREST DR LOUISE ST LEDROIT ST E AC 2 7 669 32 21,420 2/14/22 87 30 29 41 New Construction - AC 1/1/96 HILLC 6130587 HILLCREST DR NW END LOUISE ST E AC 2 7 148 32 4,748 2/14/22 90 40 40 20 New Construction - AC 1/1/02 HILLC 6130656 HILLCREST DR PINECREST DR CHIQUITA ST C AC 2 7 707 34 24,038 2/14/22 88 0 52 48 New Construction - AC 1/1/90 HILLE 6130097 HILLEDGE DR BLUMONT ST MYSTIC WY E AC 2 12 879 28 24,612 4/8/22 87 27 69 4 Surface Treatment - Slurry Seal 11/1/17 HILLV 6130175 HILLVIEW DR HILLVIEW DR @WYE EAST END E AC 2 2 242 24 5,806 4/7/22 86 19 70 11 Surface Treatment - Slurry Seal 9/1/21 HILLV 6130243 HILLVIEW DR HILLVIEW DR @WYE PARK AV E AC 2 2 109 36 3,925 4/7/22 94 0 100 0 Surface Treatment - Slurry Seal 9/1/21 HILLV 6130245 HILLVIEW DR HILLVIEW DR END E AC 2 2 605 36 21,780 4/7/22 94 40 56 4 Surface Treatment - Slurry Seal 9/1/21 HINKL 6370654 HINKLE PL COAST HY ROUNSEVEL TE E AC 2 8 429 24 5,500 4/7/22 74 46 36 18 Surface Treatment - Slurry Seal 11/1/16 HOLLY 6130295 HOLLY DR CYPRESS DR MONTEREY DR E AC 2 6 625 36 22,500 2/11/22 84 0 34 66 Surface Treatment - Slurry Seal 5/22/25 HOLLY 6130347 HOLLY DR MONTEREY DR HIGH DR E AC 2 6 770 36 27,717 2/11/22 84 0 83 17 Surface Treatment - Slurry Seal 5/22/25 HOLLY 6370483 HOLLY DR ALTA LOMA DR NORTH END E AC 2 1 1,565 26 40,686 2/18/22 90 41 43 16 Surface Treatment - Slurry Seal 10/1/19 HOLLY 6370490 HOLLY DR ALTA LOMA DR OCEAN VIEW ST E AC 2 1 667 32 21,356 2/18/22 91 0 56 44 Surface Treatment - Slurry Seal 10/1/19 IRIS 6370773 IRIS WY ALTA VISTA WY END E AC 2 8 405 22 9,000 4/8/22 95 0 69 31 Surface Treatment - Slurry Seal 11/1/16 JASMI 6130289 JASMINE ST CYPRESS DR MONTEREY DR E AC 2 6 625 38 23,750 2/11/22 93 0 90 10 Surface Treatment - Slurry Seal 5/22/25 JASMI 6130336 JASMINE ST MONTEREY DR HIGH DR E AC 2 6 784 38 29,791 2/11/22 81 0 38 62 Surface Treatment - Slurry Seal 5/22/25 JASMI 6130339 JASMINE ST CLIFF DR COAST HY E AC 2 7 218 32 6,973 4/5/22 74 0 5 95 New Construction - AC 1/1/92 JASMI 6130356 JASMINE ST COAST HY CYPRESS DR E AC 2 6 329 38 12,502 4/5/22 73 0 20 80 Surface Treatment - Slurry Seal 5/22/25 JUANI 6370694 JUANITA WY ALTA VISTA WY END E AC 2 8 578 26 15,028 2/15/22 84 0 26 74 Surface Treatment - Slurry Seal 11/1/16 KATEL 6180316 KATELLA ST SUMMIT DR N END P AC 2 9 302 30 9,060 2/16/22 95 0 100 0 New Construction - AC 1/1/80 KATEL 6180554 KATELLA ST CAPISTRANO AV END (N) E AC 2 9 859 25 18,300 2/15/22 85 37 36 27 Surface Treatment - Slurry Seal 12/1/14 KATEL 6180558 KATELLA ST END (S) CAPISTRANO AV E AC 2 9 717 25 17,925 2/15/22 70 79 18 3 Surface Treatment - Slurry Seal 12/1/14 KENDA 6370734 KENDAL DR BALBOA AVE END E AC 2 9 628 28 21,546 2/18/22 93 0 90 10 Surface Treatment - Slurry Seal 12/1/14 KILO 6370695 KILO WY ALTA VISTA WY END E AC 2 8 578 22 12,716 4/8/22 95 0 82 18 Surface Treatment - Slurry Seal 11/1/16 LA BR 6130565 LA BREA ST COAST HY HILLCREST DR E AC 2 7 620 28 17,360 2/14/22 94 0 100 0 New Construction - AC 1/1/08 LA BR 6130736 LA BREA ST CLIFF DR COAST HY E AC 2 7 439 28 12,279 2/17/22 90 0 91 9 New Construction - AC 1/1/90 LA MI 6180197 LA MIRADA ST ENSENADA AV N END E AC 2 9 874 25 20,163 2/16/22 92 0 75 25 Surface Treatment - Slurry Seal 12/1/14 LA MI 6180330 LA MIRADA ST DEL MAR AV ENSENADA AV C AC 2 9 430 25 12,450 2/15/22 89 0 100 0 Surface Treatment - Slurry Seal 12/1/14 LA MI 6180540 LA MIRADA ST CORTEZ AV DEL MAR AV C AC 2 9 860 25 21,500 2/15/22 85 56 44 0 Surface Treatment - Slurry Seal 12/1/14 LA MI 6180542 LA MIRADA ST BONITA WY CORTEZ AV C AC 2 9 298 25 7,450 2/15/22 67 47 43 10 Surface Treatment - Slurry Seal 12/1/14 LA VI 6130021 LA VISTA DR NW END MANZANITA DR E AC 2 12 407 22 8,949 4/8/22 83 13 58 29 Surface Treatment - Slurry Seal 11/1/17 LAGUN AV 6180099 LAGUNA AV COAST HY EL PASEO ST P PCC 2 0 148 30 4,440 4/29/22 83 25 42 33 New Construction - PCC 6/1/99 LAGUN AV 6180101 LAGUNA AV COAST HY GLENNEYRE ST P AAC 2 3 298 32 9,536 5/22/22 100 0 0 0 Overlay - AC Structural 5/22/22 LAGUN 6130143 LAGUNA CYN RD FRONTAGE LAGUNA CANYON RD WOODLAND DR E AC 1 13 1,305 34 44,363 4/4/22 86 17 52 31 New Construction - AC 1/1/10 LAVEN 6180164 LAVENDER LN MORNINGSIDE DR NE END E AC 2 11 172 36 6,210 2/16/22 93 0 70 30 Surface Treatment - Slurry Seal 11/1/16 LEDRO L 6130509 LEDROIT LN SUNSET RIDGE DR END P AC 0 7 185 26 4,810 2/14/22 90 0 100 0 New Construction - AC 1/1/80 LEDRO 6130510 LEDROIT ST LEDROIT ST @WYE NE END E AC 2 7 38 60 2,296 4/7/22 90 0 89 11 New Construction - AC 1/1/82 LEDRO 6130563 LEDROIT ST COAST HY LEDROIT ST E AC 2 7 550 32 17,600 4/7/22 79 33 40 27 New Construction - AC 1/1/82 LEDRO 6130578 LEDROIT ST LEDROIT ST @WYE SUNSET RIDGE DR E AC 2 7 892 32 28,546 4/7/22 81 13 32 55 New Construction - AC 1/1/87 LEDRO 6130581 LEDROIT ST LEDROIT ST @WYE SE END E AC 2 7 129 46 5,939 2/14/22 86 0 100 0 New Construction - AC 1/1/07 LEGIO 6180046 LEGION ST CATALINA ST PARK AV E AC 2 3 781 42 32,802 2/17/22 41 69 31 0 New Construction - AC 1/1/87 LEGIO 6180076 LEGION ST COAST HY CATALINA ST E AAC 2 3 586 42 24,612 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 LINDE 6130276 LINDEN ST HIGH DR NORTH END E AC 2 6 516 28 7,532 2/11/22 90 0 61 39 Surface Treatment - Slurry Seal 5/22/25 LINDE 6130335 LINDEN ST CYPRESS DR HIGH DR P AC 2 6 772 28 21,616 2/11/22 92 0 100 0 Surface Treatment - Slurry Seal 5/22/25 LOCUS 6130284 LOCUST ST CYPRESS DR MONTEREY DR E AC 2 6 625 36 22,500 2/11/22 91 39 61 0 Surface Treatment - Slurry Seal 5/22/25 LOCUS 6130312 LOCUST ST MONTEREY DR HIGH DR E AC 2 6 716 36 25,760 2/11/22 87 38 44 18 Surface Treatment - Slurry Seal 5/22/25 LOMA 6130117 LOMA TERR S END N END E AC 2 4 920 28 25,760 2/17/22 61 48 18 34 New Construction - AC 1/1/08 LOMA 6130119 LOMA TERR THIRD ST LOMA TE E AC 2 4 185 26 4,811 2/17/22 83 0 80 20 New Construction - AC 1/1/81 LOMBA 6180112 LOMBARDY LN WILSON ST TEMPLE TE E AC 2 13 627 26 16,290 2/16/22 90 0 100 0 New Construction - AC 1/1/10 LOMBA 6180122 LOMBARDY LN ANITA ST WILSON ST E AC 2 13 579 28 16,210 2/16/22 91 0 65 35 New Construction - AC 1/1/10 LOMIT 6370697 LOMITA WY ALTA VISTA WY END E AC 2 8 459 20 9,189 4/8/22 91 29 49 22 Surface Treatment - Slurry Seal 11/1/16 LOOKO 6130491 LOOKOUT DR POPLAR ST END E AC 2 6 497 30 14,910 2/11/22 82 51 49 0 Surface Treatment - Slurry Seal 5/22/25 LORET 6370088 LORETTA DR BOLSANA DR SE END E AC 2 9 540 32 16,198 4/29/22 75 0 43 57 Surface Treatment - Slurry Seal 12/1/14 LOS O 6180055 LOS OLIVOS GLENNEYRE ST CATALINA ST E AAC 2 3 287 38 10,906 2/17/22 95 0 100 0 Overlay - AC Structural 1/1/22
37 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date LOS R 6180095 LOS ROBLES EL CAMINO DEL MAR EL BOSQUE E AAC 2 3 769 36 27,684 2/17/22 87 0 28 72 Overlay - AC Structural 1/1/22 LOUIS 6130508 LOUISE ST WEST END LOUISE ST @WYE E AC 2 7 88 28 2,456 2/14/22 69 26 51 23 New Construction - AC 1/1/81 LOUIS 6130585 LOUISE ST LEDROIT ST HILLCREST ST E AC 2 7 884 30 26,520 2/14/22 66 56 14 30 New Construction - AC 1/1/87 LOWER 6130409 LOWER CLIFF DR CLIFF DR BEACH ST E AC 2 6 1,050 20 20,997 4/7/22 77 82 16 2 Surface Treatment - Slurry Seal 5/22/25 MADIS 6180206 MADISON PL BLUEBIRD CANYON DR END E AC 2 11 701 26 19,426 2/16/22 85 0 33 67 Surface Treatment - Slurry Seal 11/1/16 MAGNO 6130293 MAGNOLIA DR JASMINE ST ASTER ST E AC 2 6 640 30 19,200 2/11/22 83 36 29 35 Surface Treatment - Slurry Seal 5/22/25 MANZA 6130092 MANZANITA DR PARK AV LA VISTA DR E AC 2 12 679 34 23,071 4/4/22 74 55 30 15 Surface Treatment - Slurry Seal 11/1/17 MANZA 6130109 MANZANITA DR LA VISTA DR SKYLINE DR E AC 2 12 812 36 29,230 4/8/22 80 52 33 15 Surface Treatment - Slurry Seal 11/1/17 MAR V 6180176 MAR VISTA AVE TERRACE WY NE END E AC 2 8 287 24 6,895 4/6/22 72 44 25 31 Surface Treatment - Slurry Seal 12/1/14 MAR V 6370321 MAR VISTA AVE SUNSET AV EAST END E AC 2 1 196 38 7,450 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 MAR V 6370366 MAR VISTA AVE EAGLEROCK WY THIRD AV E AC 2 1 614 26 15,964 2/18/22 90 51 49 0 Surface Treatment - Slurry Seal 10/1/19 MAR V 6370370 MAR VISTA AVE SUNSET AV THIRD AV E AC 2 1 674 26 17,519 2/18/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 MAR V 6370434 MAR VISTA AVE EAGLEROCK WY END E AC 2 1 340 26 8,840 4/8/22 86 80 17 3 Surface Treatment - Slurry Seal 10/1/19 MARIL 6370611 MARILYN DR OCEAN VIEW VISTA DR NORTH END E AC 2 1A 621 26 16,152 4/8/22 80 30 42 28 Surface Treatment - Slurry Seal 11/1/20 MARIL 6370628 MARILYN DR WESLEY DR OCEAN VIEW VISTA DR E AC 2 1A 741 32 23,709 4/8/22 86 62 38 0 Surface Treatment - Slurry Seal 11/1/20 MARIN 6130747 MARINE DR CLIFF DR CLIFF DR E AC 2 7 795 34 27,030 4/7/22 88 49 24 27 New Construction - AC 1/1/02 MARIO 6370705 MARION WY NW END DUMOND DR E AC 2 8 139 28 3,903 4/29/22 94 0 75 25 Surface Treatment - Slurry Seal 11/1/16 MARLI 6370733 MARLIN DR KENDAL DR GULL CL E AC 2 9 717 24 11,483 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 MCAUL 6370722 MCAULAY PL VICTORIA DR COAST HY E AC 2 8 454 28 12,714 4/29/22 90 0 24 76 Surface Treatment - Slurry Seal 11/1/16 MCKNI 6130707 MCKNIGHT DR COAST HY S END E AC 2 7 995 32 31,840 2/14/22 80 50 22 28 New Construction - AC 1/1/95 MEADO 6180254 MEADOWLARK DR ORIOLE DR END E AC 2 11 720 24 17,280 2/16/22 91 0 100 0 Surface Treatment - Slurry Seal 11/1/17 MEADO LN 6180170 MEADOWLARK LN MEADOWLARK DR END P AC 2 11 532 32 18,224 2/16/22 91 0 100 0 Surface Treatment - Slurry Seal 11/1/17 MERMA 6130059 MERMAID ST THIRD ST LOMA TERR E AC 2 4 187 28 5,250 2/17/22 93 0 100 0 New Construction - AC 1/1/82 MERMA 6130068 MERMAID ST GLENNEYRE ST THIRD ST E AC 2 4 602 34 20,468 2/17/22 79 0 55 45 New Construction - AC 1/1/09 MIRAM 6180344 MIRAMAR ST DEL MAR AV END (N) E AC 2 9 859 25 10,750 2/15/22 92 0 100 0 Surface Treatment - Slurry Seal 12/1/14 MIRAM 6180550 MIRAMAR ST CORTEZ AV DEL MAR AV E AC 2 9 860 25 21,500 2/15/22 81 49 22 29 Surface Treatment - Slurry Seal 12/1/14 MONTE 6130396 MONTEREY ST LINDEN ST JASMINE ST C AC 1 6 1,280 30 38,400 2/14/22 88 0 46 54 Surface Treatment - Slurry Seal 5/22/25 MONTE 6130399 MONTEREY ST JASMINE ST HIGH DR C AC 1 6 1,221 30 36,630 2/14/22 80 0 35 65 Surface Treatment - Slurry Seal 5/22/25 MONTE 6370406 MONTEREY ST EAGLEROCK WY WEST ST E AC 2 1 753 28 21,084 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 MONTE 6370478 MONTEREY ST WEST ST BROOKS ST E AC 2 1 594 28 16,632 2/18/22 90 0 78 22 Surface Treatment - Slurry Seal 10/1/19 MONTE 6370537 MONTEREY ST BROOKS ST S BROOKS ST N E AC 1 1 1,744 38 66,273 2/18/22 91 0 66 34 Surface Treatment - Slurry Seal 10/1/19 MOORE 6130008 MOOREA WY SKYLINE DR EAST END E AC 2 12 470 24 11,287 4/7/22 76 26 58 16 Surface Treatment - Slurry Seal 11/1/17 MORNI CIR 6180217 MORNINGSIDE CIR MORNINGSIDE DR END P AC 2 11 79 31 2,449 2/16/22 96 0 38 62 Surface Treatment - Slurry Seal 11/1/16 MORNI 6180246 MORNINGSIDE DR LAVENDER LN BLUEBIRD CANYON DR E AC 2 11 1,353 32 43,296 2/16/22 84 64 36 0 Surface Treatment - Slurry Seal 11/1/16 MORNI 6180248 MORNINGSIDE DR STARLIT DR LAVENDER LN E AC 2 11 1,327 32 42,464 2/16/22 90 0 60 40 Surface Treatment - Slurry Seal 11/1/16 MORNI 6180250 MORNINGSIDE DR RANCHO LAGUNA RD STARLIT DR E AC 2 11 2,248 32 71,952 2/16/22 85 0 83 17 Surface Treatment - Slurry Seal 11/1/16 MOSS 6370751 MOSS ST CATALINA ST SOUTH END E AC 2 10 620 28 17,360 2/11/22 96 0 100 0 Surface Treatment - Slurry Seal 11/1/20 MOSS 6370756 MOSS ST OCEAN WY COAST HY E AC 2 10 231 36 8,308 2/17/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 MOUNT 6180456 MOUNTAIN RD CATALINA ST CRESS ST E AC 2 10 944 42 39,648 2/10/22 84 19 31 50 Surface Treatment - Slurry Seal 11/1/16 MOUNT 6180476 MOUNTAIN RD COAST HY CATALINA ST E AC 2 10 566 42 23,772 2/10/22 78 52 22 26 Surface Treatment - Slurry Seal 11/1/16 MOUNT 6180489 MOUNTAIN RD S END COAST HY E AC 2 10 190 36 6,840 2/16/22 93 0 100 0 Surface Treatment - Slurry Seal 11/1/16 MOUNT V 6130161 MOUNTAIN VIEW DR TEMPLE HILLS DR END P AC 2 2 581 34 19,754 4/6/22 93 36 64 0 Surface Treatment - Slurry Seal 9/15/21 MOUNT V 6130164 MOUNTAIN VIEW DR TYROL DR END P AC 2 2 292 34 11,178 4/5/22 96 0 70 30 Surface Treatment - Slurry Seal 9/15/21 MOUNT V 6130199 MOUNTAIN VIEW DR TEMPLE HILLS DR TYROL DR P AC 0 2 1,648 34 56,032 4/6/22 95 0 100 0 Surface Treatment - Slurry Seal 9/15/21 MYRTL 6130300 MYRTLE ST MONTEREY DR HIGH DR E AC 2 6 643 36 23,149 2/11/22 91 0 47 53 Surface Treatment - Slurry Seal 5/22/25 MYRTL 6130364 MYRTLE ST CYPRESS DR MONTEREY DR E AC 2 6 625 36 22,500 2/11/22 95 0 100 0 Surface Treatment - Slurry Seal 5/22/25 MYRTL 6130381 MYRTLE ST COAST HY CYPRESS DR E AC 2 6 330 34 11,220 2/11/22 92 0 43 57 Surface Treatment - Slurry Seal 5/22/25 MYRTL 6130382 MYRTLE ST CLIFF DR COAST HY E AC 2 7 340 30 10,197 4/5/22 92 37 63 0 New Construction - AC 1/1/94 MYSTI LN 6130019 MYSTIC LN MYSTIC WY END P AC 0 12 177 18 3,186 4/8/22 84 10 86 4 Surface Treatment - Slurry Seal 11/1/17 MYSTI V 6130013 MYSTIC VIEW MYSTIC WY END P AC 0 12 1,144 26 29,744 4/8/22 93 0 62 38 Surface Treatment - Slurry Seal 11/1/17 MYSTI 6130054 MYSTIC WY SKYLINE DR VISTA LN E AC 2 12 1,375 24 33,000 4/8/22 94 0 40 60 Surface Treatment - Slurry Seal 11/1/17 MYSTI 6130096 MYSTIC WY HILLEDGE DR VISTA LN E AC 2 12 1,359 36 48,924 4/8/22 84 52 46 2 Surface Treatment - Slurry Seal 11/1/17 NESTA 6130163 NESTALL RD MOUNTAIN VIEW DR END E AC 2 2 757 32 24,214 4/6/22 91 30 70 0 Surface Treatment - Slurry Seal 9/15/21 NIDO 6370787 NIDO WY ALTA VISTA WY END E AC 2 8 715 26 16,172 4/8/22 83 67 13 20 Surface Treatment - Slurry Seal 11/1/16 NINTH 6370252 NINTH AV COAST HY VIRGINIA WY E AC 2 1 200 24 4,800 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 NINTH 6370258 NINTH AV VIRGINIA WY LUPIN PL E AC 2 1 579 24 13,896 2/18/22 93 0 61 39 Surface Treatment - Slurry Seal 10/1/19 NORIA 6180326 NORIA ST ENSENADA AV END E AC 2 9 1,023 26 27,534 2/15/22 92 0 41 59 Surface Treatment - Slurry Seal 12/1/14 NYES 6370619 NYES PL END (S) COAST HWY C AC 2 8 315 30 9,450 4/8/22 84 55 29 16 Surface Treatment - Slurry Seal 11/1/16 NYES 6370621 NYES PL HIGHLAND RD BALBOA AV C AC 2 8 3,918 38 135,560 2/15/22 90 0 69 31 Surface Treatment - Slurry Seal 11/1/16 NYES 6370669 NYES PL COAST HWY HIGHLAND WY C AC 2 8 215 30 6,450 4/8/22 88 36 64 0 Surface Treatment - Slurry Seal 11/1/16 OAK S 6180125 OAK ST WILSON ST TEMPLE TERR E AC 2 13 524 38 19,923 2/10/22 80 42 58 0 New Construction - AC 1/1/90 OAK S 6180126 OAK ST CATALINA ST WILSON ST E AC 2 13 805 38 30,586 2/10/22 92 0 94 6 New Construction - AC 1/1/02 OAK S 6180181 OAK ST TEMPLE TE EAST END E AC 2 13 567 28 15,875 4/29/22 94 0 28 72 New Construction - AC 1/1/86 OAK S 6180432 OAK ST GAVIOTA DR COAST HY E AC 2 13 147 38 5,605 2/16/22 94 0 69 31 New Construction - AC 1/1/82 OAK S 6180460 OAK ST COAST HY CATALINA ST E AC 2 13 566 38 21,508 2/10/22 94 0 100 0 New Construction - AC 1/1/90 OCEAN A 6130081 OCEAN AV BEACH ST THIRD ST P AC 0 4 801 42 33,642 4/8/22 70 74 26 0 New Construction - AC 1/1/80 OCEAN A 6130083 OCEAN AV COAST HY BEACH ST P AC 0 4 760 42 31,920 4/8/22 77 50 49 1 New Construction - AC 1/1/80 OCEAN FRO 6180509 OCEAN FRONT BROOKS ST END P AC 2 13 408 20 8,160 4/8/22 85 75 4 21 New Construction - AC 1/1/80 OCEAN V 6370535 OCEAN VIEW ST MONTEREY ST HOLLY DR P AC 2 1 480 24 11,520 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 OCEAN VIEW 6370610 OCEAN VIEW VISTA DR MARILYN DR END P AC 2 1A 360 31 11,160 4/8/22 92 26 74 0 Surface Treatment - Slurry Seal 11/1/20 OCEAN VIEW 6370625 OCEAN VIEW VISTA DR DRIFTWOOD DR END P AC 0 1A 1,007 31 31,217 4/8/22 84 19 43 38 Surface Treatment - Slurry Seal 11/1/20 OCEAN VIEW 6370629 OCEAN VIEW VISTA DR MARILYN DR DRIFTWOOD DR P AC 2 1A 407 31 12,617 4/8/22 87 24 68 8 Surface Treatment - Slurry Seal 11/1/20 OCEAN 6180621 OCEAN WY AGATE ST PEARL ST E AC 2 10 354 36 12,730 2/17/22 91 0 48 52 Surface Treatment - Slurry Seal 11/1/16
38 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date OCEAN 6180644 OCEAN WY PEARL ST DIAMOND ST E AC 2 10 750 36 27,015 2/17/22 89 0 44 56 Surface Treatment - Slurry Seal 11/1/16 OCEAN 6180646 OCEAN WY RUBY ST MOSS ST E AC 2 10 350 36 12,606 2/17/22 92 0 52 48 Surface Treatment - Slurry Seal 11/1/16 OCEAN 6180652 OCEAN WY DIAMOND ST RUBY ST E AC 2 10 347 26 9,015 2/17/22 92 0 56 44 Surface Treatment - Slurry Seal 11/1/16 OLIVE 6130277 OLIVE ST HIGH DR NE END E AC 2 6 283 30 8,500 2/11/22 83 0 32 68 Surface Treatment - Slurry Seal 5/22/25 ORIOL 6180168 ORIOLE DR ORIOLE DR EAST END E AC 2 11 40 28 1,118 2/16/22 81 0 100 0 New Construction - AC 1/1/76 ORIOL 6180253 ORIOLE DR BLUEBIRD CANYON DR FLAMIINGO RD E AC 2 11 1,179 32 37,728 2/16/22 89 0 90 10 Surface Treatment - Slurry Seal 11/1/17 ORO S 6180333 ORO ST CAPISTRANO AV DEL MAR AV E AC 2 9 430 25 10,750 2/15/22 79 0 80 20 Surface Treatment - Slurry Seal 12/1/14 OSGOO 6180626 OSGOOD CT SW END CATALINA ST E AC 1 10 175 18 3,150 4/29/22 90 0 100 0 Surface Treatment - Slurry Seal 11/1/20 OSGOO 6180627 OSGOOD CT CATALINA ST NE END E AC 1 10 275 18 4,950 4/29/22 88 0 100 0 Surface Treatment - Slurry Seal 11/1/20 PACIF 6130009 PACIFIC AV CORAL DR END E AC 2 12 343 28 9,660 4/7/22 95 0 63 37 Surface Treatment - Slurry Seal 5/22/24 PACIF 6130045 PACIFIC AV SKYLINE DR CORAL DR E AC 2 12 719 28 20,132 4/7/22 93 35 65 0 Surface Treatment - Slurry Seal 5/22/24 PACVISTA 6180632 PACIFIC VISTA GAINSBOROUGH DR END P AC 2 9 485 18 8,730 4/29/22 88 0 32 68 Surface Treatment - Slurry Seal 5/22/24 PALA 6370561 PALA WY ALTA VISTA WY AVENUE W E AC 1 8 363 14 5,083 4/8/22 84 0 86 14 Surface Treatment - Slurry Seal 11/1/16 PALA 6370698 PALA WY ALTA VISTA WY END E AC 1 8 221 14 3,094 4/8/22 94 0 88 12 Surface Treatment - Slurry Seal 11/1/16 PALM 6130177 PALM DR TEMPLE HILLS DR NE END E AC 2 8 367 30 11,019 4/6/22 87 46 35 19 Surface Treatment - Slurry Seal 12/1/14 PALME 6180409 PALMER PL CATALINA ST END E AC 2 10 225 32 7,200 2/10/22 92 0 42 58 Surface Treatment - Slurry Seal 11/1/16 PANOR 6130588 PANORAMA DR SUNSET RIDGE DR ELEANOR LN E AC 2 7 847 26 22,022 2/14/22 82 37 43 20 New Construction - AC 1/1/81 PANOR 6130590 PANORAMA DR ELEANOR LN END E AC 2 7 341 36 12,276 2/14/22 94 0 87 13 New Construction - AC 1/1/82 PARK 6130100 PARK AV BLUMONT ST ST ANNS DR C AC 2 3 983 38 37,354 4/4/22 73 49 50 1 New Construction - AC 1/1/01 PARK 6130111 PARK AV ST ANNS DR WENDT TERR C AC 2 3 1,015 38 38,570 2/17/22 73 0 95 5 New Construction - AC 1/1/85 PARK 6130150 PARK AV GLENNEYRE ST BLUMONT ST C AAC 2 3 1,327 38 50,426 5/22/25 100 0 0 0 Overlay - AC Structural 5/22/25 PARK 6130215 PARK AV BERN DR S ALTA LAGUNA BLVD C AC 2 2 598 64 38,272 4/5/22 90 0 100 0 Surface Treatment - Slurry Seal 9/15/21 PARK 6130216 PARK AV TAHITI AV HIDDEN VALLEY RD C AC 2 12 1,039 48 49,872 4/7/22 79 46 54 0 Surface Treatment - Slurry Seal 11/1/17 PARK 6130244 PARK AV TAHITI AV BERN DR S C AC 2 2 1,993 48 95,664 4/5/22 91 29 71 0 Surface Treatment - Slurry Seal 9/15/21 PARK 6130255 PARK AV WENDT TERR HIDDEN VALLEY CANYON RD C AC 2 12 3,300 42 138,600 4/5/22 80 45 52 3 Surface Treatment - Slurry Seal 11/1/17 PARK 6180153 PARK AV COAST HY EAST END C AC 2 4 185 34 6,296 4/29/22 70 54 17 29 New Construction - AC 1/1/84 PARK P 6130165 PARK PL ALTA LAGUNA BLVD END P AC 2 2 426 36 15,336 4/5/22 98 0 100 0 Surface Treatment - Slurry Seal 9/15/21 PASEO 6370474 PASEO DEL SUR RICO RD EAST END E AC 2 1 515 28 14,432 4/8/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 PASEO 6370534 PASEO DEL SUR TOTO LOMA LN RICO RD E AC 2 1 831 28 23,261 4/8/22 99 0 100 0 Surface Treatment - Slurry Seal 10/1/19 PEARL 6180630 PEARL ST SANTA CRUZ ST SUMMIT DR E AC 2 10 860 26 22,360 2/16/22 100 0 0 0 Surface Treatment - Slurry Seal 11/1/20 PEARL 6180641 PEARL ST OCEAN WY COAST HY E AC 2 10 260 34 8,840 4/7/22 90 38 57 5 Surface Treatment - Slurry Seal 11/1/16 PEARL 6180642 PEARL ST COAST HY CATALINA ST E AC 2 10 714 38 27,132 2/10/22 94 0 83 17 Surface Treatment - Slurry Seal 11/1/20 PEARL 6180656 PEARL ST CATALINA ST CENTER ST E AC 2 10 600 28 16,800 2/10/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 PEDRO 6370552 PEDRO ST BROOKS ST SE BROOKS ST NW E AC 2 1 1,347 24 32,333 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 PELIC 6370682 PELICAN ST GULL CL NORTH END E AC 2 9 376 24 9,022 2/18/22 84 40 41 19 Surface Treatment - Slurry Seal 12/1/14 PINEC 6130660 PINECREST DR HILLCREST DR END E AC 2 7 907 24 21,768 2/11/22 90 0 51 49 New Construction - AC 1/1/78 PITCA 6130007 PITCAIRN PL PACIFIC AV NORTH END E AC 2 12 98 28 2,754 4/7/22 96 0 100 0 Surface Treatment - Slurry Seal 11/1/17 POPLA 6130265 POPLAR ST CYPRESS DR MONTEREY DR E AC 2 6 492 38 18,703 2/14/22 87 51 21 28 Surface Treatment - Slurry Seal 5/22/25 POPLA 6130394 POPLAR ST MONTEREY DR HIGH DR E AC 2 6 715 38 27,169 2/11/22 88 0 54 46 Surface Treatment - Slurry Seal 5/22/25 POPLA 6130488 POPLAR ST HIGH DR HAROLD DR E AC 2 6 684 34 23,247 2/11/22 65 0 20 80 Surface Treatment - Slurry Seal 5/22/25 POPLA 6130490 POPLAR ST HAROLD DR LOOKOUT DR E AC 2 6 225 38 8,536 2/11/22 81 0 28 72 Surface Treatment - Slurry Seal 5/22/25 QUEDA 6370699 QUEDA WY ALTA VISTA WY W END E AC 2 8 475 20 9,501 4/8/22 93 0 51 49 Surface Treatment - Slurry Seal 11/1/16 QUEDA 6370713 QUEDA WY ALTA VISTA WY E END E AC 2 8 263 26 6,846 4/8/22 97 0 68 32 Surface Treatment - Slurry Seal 11/1/16 QUIVE 6180350 QUIVERA ST CORTEZ AV CAPISTRANO AV E AC 1 9 430 20 9,458 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 QUIVE 6180362 QUIVERA ST ALISOS AV CORTEZ AV E AC 1 9 352 20 7,738 2/15/22 94 0 74 26 Surface Treatment - Slurry Seal 12/1/14 RADCL 6180628 RADCLIFF CT SW END CATALINA ST E AC 1 10 175 22 3,850 2/11/22 82 0 52 48 Surface Treatment - Slurry Seal 11/1/16 RADCL 6180701 RADCLIFF CT CATALINA ST N END E AC 1 10 110 22 2,420 2/11/22 90 0 68 32 Surface Treatment - Slurry Seal 11/1/16 RAMON 6180003 RAMONA AV LEGION ST SE END E AAC 2 3 733 28 20,518 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 RAMON 6180103 RAMONA AV LEGION ST BEGIN PAVER STONES E AAC 2 3 508 38 19,304 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 RANCHO LAG 6180260 RANCHO LAGUNA RD BLUEBIRD CANYON DR MORNINGSIDE DR P AC 2 11 575 31 17,825 2/16/22 88 19 81 0 Surface Treatment - Slurry Seal 11/1/16 RANDA 6180394 RANDALL WY SANTA CRUZ ST END E AC 2 10 339 28 9,499 2/10/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/16 REED 6180058 REED ST PARK AV LEGION ST E AAC 2 3 253 30 7,600 2/17/22 93 0 73 27 Overlay - AC Structural 1/1/22 REGAT 6180249 REGATTA RD BLUEBIRD CANYON DR MORNINGSIDE DR E AC 2 11 589 24 14,138 2/16/22 92 0 90 10 Surface Treatment - Slurry Seal 11/1/16 REGAT 6180251 REGATTA RD BLUEBIRD CANYON DR SW BLUEBIRD CANYON DR NE E AC 2 11 1,001 26 26,035 2/16/22 85 27 32 41 Surface Treatment - Slurry Seal 11/1/16 REMBR 6180192 REMBRANDT DR VAN DYKE DR NORTH END E AC 2 11 1,101 18 19,825 2/16/22 81 63 20 17 Surface Treatment - Slurry Seal 11/1/17 REMBR 6180286 REMBRANDT DR VAN DYKE DR SUMMIT DR E AC 2 11 67 24 1,598 4/29/22 88 59 41 0 Surface Treatment - Slurry Seal 11/1/17 RICO 6370473 RICO RD PASEO DEL SUR EAST END E AC 2 1 269 28 7,524 4/8/22 83 18 82 0 Surface Treatment - Slurry Seal 10/1/19 RIDGE 6130242 RIDGE DR ALTA LAGUNA BLVD TYROL DR E AC 2 2 535 34 18,190 4/5/22 93 0 100 0 Surface Treatment - Slurry Seal 9/15/21 RIMCR 6130173 RIMCREST CL RIDGE DR NW END E AC 2 2 349 28 9,772 4/5/22 92 0 93 7 Surface Treatment - Slurry Seal 9/15/21 ROSA 6130343 ROSA BONHEUR CYPRESS DR CLIFF DR C AC 2 6 290 32 9,280 4/5/22 80 63 37 0 Surface Treatment - Slurry Seal 5/22/25 ROSE 6130301 ROSE PL HIGH DR HAWTHORNE RD E AC 2 6 164 26 4,276 2/14/22 95 0 100 0 Surface Treatment - Slurry Seal 5/22/25 ROUNS 6370649 ROUNSEVEL TE ASHTON DR END E AC 2 8 760 30 10,031 4/7/22 80 0 75 25 Surface Treatment - Slurry Seal 11/1/16 RUBY PL 6180700 RUBY PL RUBY ST PRIVATE DR P AC 0 10 175 31 5,425 2/11/22 93 0 59 41 Surface Treatment - Slurry Seal 11/1/16 RUBY 6180650 RUBY ST OCEAN WY COAST HWY E AC 2 10 230 36 8,282 2/17/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 RUBY 6180651 RUBY ST COAST HY GLENNEYRE ST E AC 2 10 305 36 10,980 2/11/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 RUBY 6180678 RUBY ST GLENNEYRE ST RUBY PL E AC 2 10 516 24 12,384 2/11/22 82 54 46 0 Surface Treatment - Slurry Seal 11/1/16 SAMOA 6130005 SAMOA WY SKYLINE DR END E AC 2 12 293 22 6,446 4/7/22 87 0 96 4 Surface Treatment - Slurry Seal 11/1/17 SAN C 6370686 SAN CLEMENTE ST ALTA VISTA WY END E AC 2 8 359 18 4,626 4/8/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 SANJOAQ 6370266 SAN JOAQUIN COAST HY HILLCREST DR P AC 0 7 620 26 16,120 2/14/22 85 0 35 65 New Construction - AC 1/1/80 SAN JOSE 7000004 SAN JOSE ST CAPISTRANO AVE END E AC 0 9 61 25 1,285 2/15/22 73 55 13 32 Surface Treatment - Slurry Seal 12/1/14 SAN R 6130239 SAN REMO DR TEMPLE HILLS DR SW TEMPLE HILLS DR NE E AC 2 8 1,336 24 32,056 4/6/22 77 69 31 0 Surface Treatment - Slurry Seal 12/1/14 SANDP 6370685 SANDPIPER DR WEST END DAVIS WY E AC 2 9 157 21 3,445 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 SANTA ANA 7000006 SANTA ANA ST DEL MAR AV CORTEZ AVE E AC 0 9 830 20 16,600 2/15/22 90 38 41 21 Surface Treatment - Slurry Seal 12/1/14
39 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date SANTA ANA 7000007 SANTA ANA ST CORTEZ AVE END E AC 0 9 180 20 3,600 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 SANTA 6180471 SANTA CRUZ ST CALLIOPE ST MOUNTAIN RD P AC 2 10 434 28 12,152 2/10/22 90 55 45 0 Surface Treatment - Slurry Seal 11/1/16 SANTA 6180473 SANTA CRUZ ST BLUEBIRD CANYON DR END E AC 2 10 375 28 10,500 2/10/22 93 0 44 56 Surface Treatment - Slurry Seal 11/1/20 SANTA 6180694 SANTA CRUZ ST PEARL ST BLUEBIRD CANYON DR E AC 2 10 620 20 12,400 2/10/22 93 0 60 40 Surface Treatment - Slurry Seal 11/1/20 SCENI 6370382 SCENIC DR THIRD AV SECOND AV E AC 2 1 349 28 9,772 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 SCENI 6370388 SCENIC DR FOURTH AV THIRD AV E AC 2 1 356 28 9,968 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 SCENI 6370393 SCENIC DR FIFTH AV FOURTH AV E AC 2 1 354 28 9,922 2/18/22 93 0 93 7 Surface Treatment - Slurry Seal 10/1/19 SCENI 6370674 SCENIC DR SECOND AV EAGLEROCK WY E AC 2 1 252 22 5,544 2/18/22 94 0 83 17 Surface Treatment - Slurry Seal 10/1/19 SEAVI 6180115 SEAVIEW ST WILSON ST TEMPLE TERR E AC 2 13 812 30 24,373 2/10/22 83 0 64 36 Surface Treatment - Slurry Seal 11/1/16 SEAVI 6180118 SEAVIEW ST AVALON AV WILSON ST E AC 2 13 398 30 11,940 2/10/22 77 34 36 30 Surface Treatment - Slurry Seal 11/1/16 SEAVI 6180120 SEAVIEW ST CATALINA ST AVALON AV E AC 2 13 303 30 9,105 2/16/22 93 0 86 14 New Construction - AC 1/1/10 SECON 6370386 SECOND AV COAST HY VIRGINIA WY E AC 2 1 200 36 7,201 2/18/22 90 0 100 0 Surface Treatment - Slurry Seal 10/1/19 SECON 6370403 SECOND AV VIRGINIA WY SCENIC DR E AC 2 1 900 24 21,600 2/18/22 93 0 79 21 Surface Treatment - Slurry Seal 10/1/19 SECON ST 6130064 SECOND ST MERMAID ST FOREST AV P AC 2 4 481 42 20,202 2/17/22 93 15 62 23 New Construction - AC 1/1/80 SEVEN 6370378 SEVENTH AV COAST HY END E AC 2 1 401 34 13,634 2/18/22 59 76 6 18 Surface Treatment - Slurry Seal 10/1/19 SHADO 6180462 SHADOW LN CATALINA ST CARMELITA ST E AC 2 10 499 44 21,956 2/10/22 89 48 23 29 Surface Treatment - Slurry Seal 11/1/16 SHORT 6180073 SHORT ST LEGION ST EL CAMINO DEL MAR E AAC 2 3 402 40 16,082 4/4/22 89 61 39 0 Overlay - AC Structural 1/1/22 SKYLI 6130004 SKYLINE DR ATLANTIC WY EAST END C AC 2 12 169 36 6,089 4/7/22 83 52 46 2 Surface Treatment - Slurry Seal 11/1/17 SKYLI 6130041 SKYLINE DR PACIFIC AV ATLANTIC WY C AC 2 12 1,033 34 35,116 4/7/22 89 0 100 0 Surface Treatment - Slurry Seal 11/1/17 SKYLI 6130043 SKYLINE DR SAMOA WY PACIFIC AV C AC 2 12 863 36 31,074 4/7/22 88 24 74 2 Surface Treatment - Slurry Seal 11/1/17 SKYLI 6130048 SKYLINE DR CORONADO DR SAMOA WY C AC 2 12 1,809 38 68,742 4/7/22 84 38 62 0 Surface Treatment - Slurry Seal 11/1/17 SKYLI 6130053 SKYLINE DR VISTA LN CORONADO DR C AC 2 12 1,138 38 43,244 4/7/22 84 39 55 6 Surface Treatment - Slurry Seal 11/1/17 SKYLI 6130108 SKYLINE DR PARK AV MANZANITA DR C AC 2 12 249 26 6,478 4/7/22 92 38 62 0 Surface Treatment - Slurry Seal 11/1/17 SKYLI 6130112 SKYLINE DR MANZANITA DR VISTA LN C AC 2 12 1,279 30 38,355 4/7/22 80 39 30 31 Surface Treatment - Slurry Seal 11/1/17 SLEEP 6180080 SLEEPY HOLLOW LN CLEO ST COAST HY E AAC 2 3 763 22 16,784 4/6/22 82 50 44 6 Overlay - AC Structural 1/1/22 SOLAN 6370555 SOLANA WY COAST HY ALTA VISTA WY E AC 2 8 706 26 18,355 4/8/22 84 46 28 26 Surface Treatment - Slurry Seal 11/1/16 SOLAN 6370710 SOLANA WY ALTA VISTA WY VICTORIA PL E AC 2 8 504 24 12,096 4/8/22 81 60 34 6 Surface Treatment - Slurry Seal 11/1/16 ST AN 6180009 ST ANNS DR COAST HY END E AC 2 3 327 36 11,790 2/10/22 93 0 93 7 New Construction - AC 1/1/00 ST AN 6180086 ST ANNS DR COAST HY GLENNEYRE ST E AAC 2 3 348 36 12,528 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 ST AN 6180096 ST ANNS DR GLENNEYRE ST CATALINA ST E AAC 2 3 354 36 12,728 4/6/22 82 68 30 2 Overlay - AC Structural 4/1/22 ST AN 6180140 ST ANNS DR WILSON ST BROWNCROFT RD E AAC 2 3 541 34 18,394 2/17/22 92 0 47 53 Overlay - AC Structural 1/1/22 ST AN 6180147 ST ANNS DR BROWNCROFT RD PARK AV E AAC 2 3 838 36 30,183 2/17/22 90 0 96 4 Overlay - AC Structural 1/1/22 ST AN 6180149 ST ANNS DR CATALINA ST WILSON ST E AAC 2 3 635 34 21,585 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 STARL 6180195 STARLIT DR MORNINGSIDE DR END E AC 2 11 1,181 32 37,792 2/16/22 82 12 28 60 Surface Treatment - Slurry Seal 11/1/16 SUMMI 6180188 SUMMIT DR SW END SUMMIT WY E AC 2 11 258 22 5,665 2/16/22 89 68 28 4 Surface Treatment - Slurry Seal 11/1/17 SUMMI 6180284 SUMMIT DR AGATE ST REMBRANDT DR C AC 2 11 512 28 14,330 2/16/22 76 74 26 0 Surface Treatment - Slurry Seal 11/1/17 SUMMI 6180287 SUMMIT DR PEARL ST DIAMOND ST C AC 2 11 576 32 18,424 2/16/22 88 49 51 0 Surface Treatment - Slurry Seal 11/1/17 SUMMI 6180288 SUMMIT DR SUMMIT PL SUMMIT DR E AC 2 11 1,960 24 47,629 2/16/22 77 0 20 80 Surface Treatment - Slurry Seal 11/1/17 SUMMI 6180300 SUMMIT DR BLUEBIRD CANYON DR AGATE ST C AC 2 11 250 22 5,500 2/16/22 87 17 49 34 Surface Treatment - Slurry Seal 11/1/17 SUMMI 6180381 SUMMIT DR KATELLA ST LA MIRADA ST C AC 2 9 563 24 14,016 2/16/22 74 48 50 2 Surface Treatment - Slurry Seal 12/1/14 SUMMI 6180534 SUMMIT DR BAJA ST KATELLA ST C AC 2 9 399 24 9,576 2/16/22 58 66 18 16 Surface Treatment - Slurry Seal 12/1/14 SUMMI 6180596 SUMMIT DR DIAMOND ST BAJA ST C AC 2 9 1,190 32 38,080 2/16/22 71 72 28 0 Surface Treatment - Slurry Seal 12/1/14 SUMMI 6180715 SUMMIT DR REMBRANDT DR PEARL ST C AC 2 11 204 22 4,498 2/16/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/17 SUNSE 6130580 SUNSET AV LEDROIT ST SUNSET RIDGE DR @WYE E AC 2 7 424 30 12,720 2/14/22 85 49 32 19 New Construction - AC 1/1/92 SUNSE 6130676 SUNSET AV NW END LEDROIT LN E AC 2 7 158 26 4,117 2/14/22 91 0 100 0 New Construction - AC 1/1/81 SUNSE 6130693 SUNSET AV SUNSET RIDGE DR @WYE SE END E AC 2 7 342 30 10,262 2/14/22 90 0 74 26 New Construction - AC 1/1/95 SUNSE 6370357 SUNSET AV EIGHTH AV VIRGINIA WY E AC 2 1 1,220 26 31,720 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 SUNSE 6370358 SUNSET AV MAR VISTA AV EIGHTH AV E AC 0 1 1,180 30 35,400 2/18/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 SUNSET TER 6370761 SUNSET TER COAST HWY VICTORIA DR P AC 0 8 737 30 22,110 4/29/22 81 45 12 43 Surface Treatment - Slurry Seal 11/1/16 TAHIT 6130017 TAHITI AV CARIBBEAN WY PARK AV E AC 2 12 523 28 14,651 4/7/22 83 27 67 6 Surface Treatment - Slurry Seal 11/1/17 TAHIT 6130039 TAHITI AV CORAL DR CARIBBEAN WY E AC 2 12 1,551 28 43,419 4/7/22 89 0 93 7 Surface Treatment - Slurry Seal 11/1/17 TEMPL 6130178 TEMPLE HILLS DR THALIA ST END P AC 2 6 2,422 26 62,972 4/6/22 66 63 22 15 New Construction - AC 1/1/80 TEMPL 6130197 TEMPLE HILLS DR ZELL DR MOUNTAIN VIEW DR C AC 2 2 803 40 32,120 4/6/22 94 0 100 0 Surface Treatment - Slurry Seal 9/15/21 TEMPL 6130203 TEMPLE HILLS DR DORN CT ZELL DR C AC 2 2 547 40 21,880 4/6/22 94 0 100 0 Surface Treatment - Slurry Seal 9/15/21 TEMPL 6130206 TEMPLE HILLS DR SAN REMO DR DORN CT C AC 2 2 1,992 34 67,745 4/6/22 94 0 95 5 Surface Treatment - Slurry Seal 9/15/21 TEMPL 6130238 TEMPLE HILLS DR SAN REMO DR SW SAN REMO DR NE C AC 2 2 910 38 34,573 4/6/22 95 0 100 0 New Construction - AC 1/1/08 TEMPL 6130246 TEMPLE HILLS DR PALM DR SAN REMO DR C AC 2 2 989 30 29,662 4/6/22 91 29 66 5 Surface Treatment - Slurry Seal 9/15/21 TEMPL 6130251 TEMPLE HILLS DR BAYVIEW PL PALM DR C AC 2 2 1,091 36 39,276 4/6/22 92 33 67 0 Surface Treatment - Slurry Seal 9/15/21 TEMPL 6180274 TEMPLE HILLS DR DUNNING DR BAYVIEW PL C AC 2 8 1,290 26 33,540 4/6/22 89 30 65 5 New Construction - AC 1/1/92 TEMPL 6180276 TEMPLE HILLS DR THALIA ST DUNNING DR C AC 2 8 1,332 24 31,961 4/6/22 90 27 67 6 New Construction - AC 1/1/92 TEMPL PL 6180186 TEMPLE PL TEMPLE TER END P AC 2 13 228 31 7,068 4/29/22 93 36 46 18 New Construction - AC 1/1/80 TEMPL TER 6180113 TEMPLE TERR OAK ST THALIA ST E AC 2 13 811 31 25,141 2/10/22 81 41 30 29 New Construction - AC 1/1/80 TEMPL TER 6180298 TEMPLE TERR CRESS ST OAK ST E AC 2 13 808 32 25,856 4/29/22 74 78 22 0 New Construction - AC 1/1/80 TEMPL TER 6180410 TEMPLE TERR CRESS ST CALLIOPE ST E AC 2 10 399 31 12,369 2/10/22 93 0 87 13 Surface Treatment - Slurry Seal 11/1/16 TENTH 6370247 TENTH AV COAST HY VIRGINIA WY E AC 2 1 200 30 6,000 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 TENTH 6370261 TENTH AV VIRGINIA WY BRACKEN WY E AC 2 1 355 22 5,224 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 TERRA 6180205 TERRACE WY CERRITOS DR S CERRITOS DR N P AC 2 8 1,939 29 56,231 4/6/22 81 51 45 4 New Construction - AC 1/1/80 TERRY 6370647 TERRY RD HINKLE PL W END E AC 2 8 458 28 10,920 4/7/22 85 48 37 15 Surface Treatment - Slurry Seal 11/1/16 TERRY 6370655 TERRY RD SE END HINKLE PL E AC 2 8 311 28 8,704 4/7/22 86 16 28 56 Surface Treatment - Slurry Seal 11/1/16 THALI 6180002 THALIA ST SW END COAST HY C AAC 2 3 114 40 4,560 5/22/25 100 0 0 0 Overlay - AC Structural 5/22/25 THALI 6180024 THALIA ST WILSON ST TEMPLE HILLS DR P AAC 2 3 1,015 40 40,600 5/22/25 100 0 0 0 Overlay - AC Structural 5/22/25 THALI 6180040 THALIA ST CATALINA ST WILSON ST C AAC 2 3 589 40 23,560 5/22/25 100 0 0 0 Overlay - AC Structural 5/22/25 THALI 6180088 THALIA ST COAST HY CATALINA ST C AAC 2 3 701 40 28,040 5/22/25 100 0 0 0 Overlay - AC Structural 5/22/25
40 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date THIRD 6370316 THIRD AV MAR VISTA AV SE END E AC 2 1 306 28 8,558 4/8/22 91 25 42 33 Surface Treatment - Slurry Seal 10/1/19 THIRD 6370371 THIRD AV SCENIC DR MAR VISTA AV E AC 2 1 230 40 9,207 2/18/22 91 0 100 0 Surface Treatment - Slurry Seal 10/1/19 THIRD 6370390 THIRD AV COAST HY VIRGINIA WY E AC 2 1 200 36 7,202 2/18/22 95 0 90 10 Surface Treatment - Slurry Seal 10/1/19 THIRD 6370401 THIRD AV VIRGINIA WY SCENIC DR E AC 2 1 715 32 22,880 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 THIRD S 6130058 THIRD ST MERMAID ST FOREST AV P AC 2 4 731 40 29,240 2/11/22 75 0 21 79 New Construction - AC 1/1/80 THIRD S 6130061 THIRD ST PARK AV MERMAID ST P PCC 2 4 400 36 14,400 2/11/22 100 0 0 0 New Construction - PCC 1/1/80 THROU 6180104 THROUGH ST PARK AV LEGION ST E AAC 2 3 476 34 16,168 2/17/22 90 0 56 44 Overlay - AC Structural 1/1/22 THURS DR 6130187 THURSTON DR TEMPLE HILLS DR END P AC 2 8 808 30 24,240 4/6/22 73 66 19 15 New Construction - AC 1/1/80 TIA J 6180343 TIA JUANA ST CAPISTRANO AV DEL MAR AV E AC 2 9 430 20 8,600 2/15/22 89 0 36 64 Surface Treatment - Slurry Seal 12/1/14 TIA J 6180356 TIA JUANA ST CORTEZ AV CAPISTRANO AV E AC 2 9 430 20 8,600 2/15/22 92 0 52 48 Surface Treatment - Slurry Seal 12/1/14 TIA J 6180368 TIA JUANA ST END CORTEZ AV E AC 2 9 152 20 3,040 2/15/22 89 0 100 0 Surface Treatment - Slurry Seal 12/1/14 TYROL 6130174 TYROL DR RIDGE DR NW END E AC 2 2 129 36 4,644 4/5/22 98 0 100 0 Surface Treatment - Slurry Seal 9/15/21 TYROL 6130191 TYROL DR ALTA LAGUNA BL MOUNTAIN VIEW DR E AC 2 2 265 36 9,522 4/5/22 96 0 100 0 Surface Treatment - Slurry Seal 9/15/21 TYROL 6130209 TYROL DR MOUNTAIN VIEW DR RIDGE DR E AC 2 2 903 36 32,508 4/5/22 92 32 59 9 Surface Treatment - Slurry Seal 9/15/21 UPLAN 6370743 UPLAND RD COAST HY GLENNEYRE ST P AC 2 10 345 31 10,695 4/7/22 83 21 57 22 Surface Treatment - Slurry Seal 11/1/20 VALID 6370479 VALIDO RD WEST ST TOTO LOMA LN E AC 2 1 176 28 4,936 4/8/22 86 0 85 15 Surface Treatment - Slurry Seal 10/1/19 VAN D 6180193 VAN DYKE DR REMBRANDT DR NE END E AC 2 11 1,492 26 38,779 2/16/22 75 59 36 5 Surface Treatment - Slurry Seal 11/1/17 VIA C 6130698 VIA CAPRI MCKNIGHT DR SE END E AC 2 7 172 28 4,821 2/14/22 85 0 45 55 New Construction - AC 1/1/95 VIACOR 6130716 VIA CORSICA MCKNIGHT SE END P AC 0 7 234 30 7,020 2/14/22 91 0 86 14 New Construction - AC 1/1/80 VIA M 6130699 VIA MAJORCA MCKNIGHT DR SE END E AC 2 7 172 36 6,198 2/14/22 96 0 100 0 New Construction - AC 1/1/85 VICTO 6370573 VICTORIA DR COAST HWY SUNSET TE E AC 2 8 1,028 26 26,738 4/29/22 89 34 22 44 Surface Treatment - Slurry Seal 11/1/16 VICTO 6370578 VICTORIA DR SUNSET TE NYES PL E AC 2 8 730 26 18,980 4/29/22 80 90 7 3 Surface Treatment - Slurry Seal 11/1/16 VICTO 7000000 VICTORIA DR HIGHLAND WY COAST HWY E AC 2 8 202 24 4,728 4/8/22 84 44 48 8 Surface Treatment - Slurry Seal 11/1/16 VIEJO 6130507 VIEJO ST HILLCREST DR NE END E AC 2 7 219 22 4,812 2/14/22 95 0 100 0 New Construction - AC 1/1/95 VIEJO 6130577 VIEJO ST COAST HY HILLCREST DR E AC 2 7 620 32 19,840 2/14/22 88 42 58 0 New Construction - AC 1/1/85 VIRGI PK 6130020 VIRGINIA PARK DR BLUMONT ST END P AC 2 12 928 24 22,272 4/8/22 79 60 34 6 Surface Treatment - Slurry Seal 11/1/17 VIRGI 6370259 VIRGINIA WY NINTH AV SUNSET AV E AC 2 1 678 22 14,916 2/18/22 88 0 50 50 Surface Treatment - Slurry Seal 10/1/19 VIRGI 6370356 VIRGINIA WY SEVENTH AV NINTH AV E AC 2 1 653 22 14,366 2/18/22 94 0 90 10 Surface Treatment - Slurry Seal 10/1/19 VIRGI 6370380 VIRGINIA WY FIFTH AV THIRD AV E AC 2 1 600 20 12,000 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 VIRGI 6370400 VIRGINIA WY THIRD AV EAGLEROCK WY E AC 2 1 600 20 12,000 2/18/22 89 0 42 58 Surface Treatment - Slurry Seal 10/1/19 VIRGI 6370798 VIRGINIA WY FIFTH AV END E AC 2 1 185 18 3,330 4/29/22 94 44 56 0 Surface Treatment - Slurry Seal 10/1/19 VISTA 6130015 VISTA LN VISTA LN EAST END E AC 2 12 242 22 5,319 4/8/22 84 24 72 4 Surface Treatment - Slurry Seal 11/1/17 VISTA 6130016 VISTA LN MYSTIC WY NORTH END E AC 2 12 770 20 15,395 4/8/22 63 66 27 7 Surface Treatment - Slurry Seal 11/1/17 VISTA 6130024 VISTA LN WEST END SKYLINE DR E AC 2 12 240 20 4,790 4/7/22 90 29 51 20 Surface Treatment - Slurry Seal 11/1/17 VISTA 6130035 VISTA LN MYSTIC WY SOUTH END E AC 2 12 550 20 11,002 4/8/22 79 66 34 0 Surface Treatment - Slurry Seal 11/1/17 WARDS 6370701 WARDS TE NW END DUMOND DR E AC 2 8 271 24 6,507 4/29/22 92 0 7 93 Surface Treatment - Slurry Seal 11/1/16 WAVE 6130555 WAVE ST COAST HY HILLCREST DR E AC 2 7 620 32 19,840 2/14/22 93 0 78 22 New Construction - AC 1/1/10 WAVE 6130700 WAVE ST CLIFF DR COAST HY E AC 2 7 370 32 11,840 2/17/22 94 0 100 0 New Construction - AC 1/1/92 WENDT 6180013 WENDT TERR GRIFFITH WY PARK AV E AAC 2 3 1,130 28 31,640 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22
41 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date Arterial / Collector (MPAH)
BLUEBIRD C 6180196 BLUEBIRD CANYON DR SUMMIT DR CRESS ST C AC 2 11 762 28 17,276 5/26/26 67 63 10 27 Surface Treatment - Slurry Seal 11/1/17 GLENN 6180434 GLENNEYRE ST BROOKS ST THALIA ST B AC 4 13 1,109 54 60,935 5/26/26 68 84 14 2 New Construction - AC 1/1/93 FORES 6130089 FOREST AV THIRD ST BROADWAY B AC 2 4 556 48 30,180 5/26/26 72 36 38 26 New Construction - AC 1/1/10 BLUEBIRD C 6180198 BLUEBIRD CANYON DR CRESS ST ORIOLE DR C AC 2 11 898 38 41,268 5/26/26 73 47 6 47 Surface Treatment - Slurry Seal 11/1/17 GLENN 6370744 GLENNEYRE ST MOSS ST UPLAND RD C AC 4 10 1,050 26 27,300 5/26/26 76 35 0 65 Surface Treatment - Slurry Seal 11/1/20 GLENN 6180500 GLENNEYRE ST BLUEBIRD CANYON RD CALLIOPE ST B AC 2 10 506 36 18,660 5/26/26 77 46 48 6 Surface Treatment - Slurry Seal 11/1/16 GLENN 6180660 GLENNEYRE ST CENTER ST BLUEBIRD CANYON DR C AC 2 10 969 36 36,645 5/26/26 78 13 6 81 Surface Treatment - Slurry Seal 11/1/20 GLENN 6180673 GLENNEYRE ST MOSS ST CENTER ST C AC 2 10 1,050 38 39,900 5/26/26 79 39 3 58 Surface Treatment - Slurry Seal 11/1/20 GLENN 6370745 GLENNEYRE ST UPLAND RD ALTA VISTA WY C AC 2 10 869 26 22,604 5/26/26 81 43 39 18 Surface Treatment - Slurry Seal 11/1/16 GLENN 6180477 GLENNEYRE ST CALLIOPE ST BROOKS ST C AC 4 10 1,076 55 59,206 5/26/26 83 59 41 0 Surface Treatment - Slurry Seal 11/1/16 FORES 6130070 FOREST AV BEACH ST THIRD ST B AC 2 4 565 48 26,928 5/26/26 85 25 75 0 New Construction - AC 1/1/98 FORES 6130076 FOREST AV COAST HY BEACH ST C AC 1 4 626 48 27,585 5/26/26 87 21 37 42 New Construction - AC 1/1/03 GLENN 6180056 GLENNEYRE ST CLEO ST LEGION ST C AAC 4 3 983 37 36,846 5/26/26 92 31 69 0 Overlay - AC Structural 5/22/25 GLENN 6180091 GLENNEYRE ST THALIA ST CLEO ST C AAC 4 3 702 55 38,724 5/26/26 93 0 100 0 Overlay - AC Structural 5/22/25 EL TO 1000 EL TORO RD LAGUNA CANYON RD 73 SB OFF-RAMP B AC 2 5 3,835 38 165,875 5/26/26 98 0 0 100 Surface Treatment - Slurry Seal 5/22/24 GLENN 6130073 GLENNEYRE ST PARK AV FOREST AV C AAC 2 4 426 38 17,145 5/26/26 100 0 100 0 Overlay - AC Structural 5/22/25 GLENN 6180052 GLENNEYRE ST LAGUNA AV LEGION ST C AAC 4 3 752 40 29,665 5/26/26 100 0 100 0 Overlay - AC Structural 5/22/25 EL TO 1003 EL TORO RD N CITY LIMIT ARTISAN DR B AC 0 5 1,549 36 55,764 5/26/26 100 0 100 0 Surface Treatment - Slurry Seal 5/22/24 EL TO 1002 EL TORO RD ARTISAN DR 73 SB OFF-RAMP B AC 3 5 1,565 32 65,470 5/26/26 100 0 0 0 Surface Treatment - Slurry Seal 5/22/24 EL TO 1001 EL TORO RD 73 SB OFF-RAMP ARTISAN DR B AC 3 5 1,565 32 60,755 5/26/26 100 0 0 0 Surface Treatment - Slurry Seal 5/22/24 4 878,731
Locals
LEGIO 6180046 LEGION ST CATALINA ST PARK AV E AC 2 3 781 42 32,802 2/17/22 41 69 31 0 New Construction - AC 1/1/87 SUMMI 6180534 SUMMIT DR BAJA ST KATELLA ST C AC 2 9 399 24 9,576 2/16/22 58 66 18 16 Surface Treatment - Slurry Seal 12/1/14 SEVEN 6370378 SEVENTH AV COAST HY END E AC 2 1 401 34 13,634 2/18/22 59 76 6 18 Surface Treatment - Slurry Seal 10/1/19 HIGH 6130349 HIGH DR JASMINE ST POPLAR ST C AC 2 6 965 30 28,950 2/11/22 61 61 14 25 Surface Treatment - Slurry Seal 5/22/25 LOMA 6130117 LOMA TERR S END N END E AC 2 4 920 28 25,760 2/17/22 61 48 18 34 New Construction - AC 1/1/08 WESLE 6370630 WESLEY DR COAST HY MARILYN DR E AC 2 1A 561 44 24,684 4/8/22 61 74 25 1 Surface Treatment - Slurry Seal 11/1/20 CEDAR 6130434 CEDAR WY ASTER ST ACACIA ST E AC 2 6 1,477 18 26,586 4/5/22 63 77 15 8 Surface Treatment - Slurry Seal 5/22/25 VISTA 6130016 VISTA LN MYSTIC WY NORTH END E AC 2 12 770 20 15,395 4/8/22 63 66 27 7 Surface Treatment - Slurry Seal 11/1/17 CANYON VIE 7000002 CANYON VIEW DR TEMPLE HILLS DR BUENA VISTA DR E AC 2 8 1,158 30 34,740 4/6/22 63 83 14 3 Surface Treatment - Slurry Seal 12/1/14 POPLA 6130488 POPLAR ST HIGH DR HAROLD DR E AC 2 6 684 34 23,247 2/11/22 65 0 20 80 Surface Treatment - Slurry Seal 5/22/25 CEDAR 6130352 CEDAR WY JASMINE ST ASTER ST E AC 2 6 640 24 15,360 4/5/22 65 72 20 8 Surface Treatment - Slurry Seal 5/22/25 TEMPL 6130178 TEMPLE HILLS DR THALIA ST END P AC 2 6 2,422 26 62,972 4/6/22 66 63 22 15 New Construction - AC 1/1/80 LOUIS 6130585 LOUISE ST LEDROIT ST HILLCREST ST E AC 2 7 884 30 26,520 2/14/22 66 56 14 30 New Construction - AC 1/1/87 ANITA ST 6180421 ANITA ST COAST HY CATALINA ST E AC 2 13 566 38 21,508 4/8/22 67 80 18 2 Surface Treatment - Slurry Seal 11/1/16 LA MI 6180542 LA MIRADA ST BONITA WY CORTEZ AV C AC 2 9 298 25 7,450 2/15/22 67 47 43 10 Surface Treatment - Slurry Seal 12/1/14 BUENA VIST 6130179 BUENA VISTA WY CANYON VIEW DR NORTH END E AC 2 8 1,255 26 32,617 4/6/22 68 71 10 19 Surface Treatment - Slurry Seal 12/1/14 Y PL 6130025 Y PL LOMA TERR END E AC 1 4 236 22 5,192 4/8/22 69 59 20 21 New Construction - AC 1/1/10 BROADWAY P 6130269 BROADWAY PL COAST HY BROADWAY E AC 2 4 926 16 14,823 4/7/22 69 58 29 13 New Construction - AC 1/1/01 LOUIS 6130508 LOUISE ST WEST END LOUISE ST @WYE E AC 2 7 88 28 2,456 2/14/22 69 26 51 23 New Construction - AC 1/1/81 OCEAN A 6130081 OCEAN AV BEACH ST THIRD ST P AC 0 4 801 42 33,642 4/8/22 70 74 26 0 New Construction - AC 1/1/80 PARK 6180153 PARK AV COAST HY EAST END C AC 2 4 185 34 6,296 4/29/22 70 54 17 29 New Construction - AC 1/1/84 CLIFF 6130432 CLIFF DR HIGH DR MYRTLE ST P AC 2 7 625 42 26,250 2/17/22 70 76 9 15 New Construction - AC 1/1/80 KATEL 6180558 KATELLA ST END (S) CAPISTRANO AV E AC 2 9 717 25 17,925 2/15/22 70 79 18 3 Surface Treatment - Slurry Seal 12/1/14 HERMO 6370769 HERMOSA WY IRIS WY N END E AC 1 8 120 18 2,160 4/8/22 71 0 81 19 Surface Treatment - Slurry Seal 11/1/16 SUMMI 6180596 SUMMIT DR DIAMOND ST BAJA ST C AC 2 9 1,190 32 38,080 2/16/22 71 72 28 0 Surface Treatment - Slurry Seal 12/1/14 CLIFF 6130332 CLIFF DR ROSA BONHEUR BROADWAY P AC 1 6 819 48 39,312 4/5/22 71 49 33 18 Surface Treatment - Slurry Seal 5/22/25 BLUEBIRD C 6180211 BLUEBIRD CANYON DR JEFFERSON WY MADISON PL C AC 2 11 429 28 2,727 2/16/22 72 44 53 3 New Construction - AC 1/1/10 MAR V 6180176 MAR VISTA AVE TERRACE WY NE END E AC 2 8 287 24 6,895 4/6/22 72 44 25 31 Surface Treatment - Slurry Seal 12/1/14 WESLE 6370092 WESLEY DR DRIFTWOOD DR END E AC 2 1A 420 36 15,124 4/8/22 72 87 13 0 Surface Treatment - Slurry Seal 11/1/20 BLUEBIRD C 6180210 BLUEBIRD CANYON DR BLUEBIRD CANYON / REGATTA RD JEFFERSON WY C AC 2 11 472 28 13,228 2/16/22 72 68 23 9 New Construction - AC 1/1/09 CLIFF 6130344 CLIFF DR ASTER ST ROSA BONHEUR P AC 2 6 1,086 48 52,128 4/5/22 73 31 59 10 Surface Treatment - Slurry Seal 5/22/25 CYPRE 6130311 CYPRESS DR HIGH DR JASMINE DR C AC 2 6 1,003 36 36,108 2/14/22 73 61 33 6 Surface Treatment - Slurry Seal 5/22/25 THURS DR 6130187 THURSTON DR TEMPLE HILLS DR END P AC 2 8 808 30 24,240 4/6/22 73 66 19 15 New Construction - AC 1/1/80 PARK 6130100 PARK AV BLUMONT ST ST ANNS DR C AC 2 3 983 38 37,354 4/4/22 73 49 50 1 New Construction - AC 1/1/01 CYPRE 6130350 CYPRESS DR JASMINE ST ACACIA DR C AC 2 6 1,882 36 67,752 2/14/22 73 54 13 33 Surface Treatment - Slurry Seal 5/22/25 JASMI 6130356 JASMINE ST COAST HY CYPRESS DR E AC 2 6 329 38 12,502 4/5/22 73 0 20 80 Surface Treatment - Slurry Seal 5/22/25 PARK 6130111 PARK AV ST ANNS DR WENDT TERR C AC 2 3 1,015 38 38,570 2/17/22 73 0 95 5 New Construction - AC 1/1/85 SAN JOSE 7000004 SAN JOSE ST CAPISTRANO AVE END E AC 0 9 61 25 1,285 2/15/22 73 55 13 32 Surface Treatment - Slurry Seal 12/1/14 MANZA 6130092 MANZANITA DR PARK AV LA VISTA DR E AC 2 12 679 34 23,071 4/4/22 74 55 30 15 Surface Treatment - Slurry Seal 11/1/17 JASMI 6130339 JASMINE ST CLIFF DR COAST HY E AC 2 7 218 32 6,973 4/5/22 74 0 5 95 New Construction - AC 1/1/92 BLUEBIRD C 6180207 BLUEBIRD CANYON DR MADISON PL HALL PL C AC 2 11 496 26 12,896 2/16/22 74 64 36 0 New Construction - AC 1/1/04 TEMPL TER 6180298 TEMPLE TERR CRESS ST OAK ST E AC 2 13 808 32 25,856 4/29/22 74 78 22 0 New Construction - AC 1/1/80 HINKL 6370654 HINKLE PL COAST HY ROUNSEVEL TE E AC 2 8 429 24 5,500 4/7/22 74 46 36 18 Surface Treatment - Slurry Seal 11/1/16 SUMMI 6180381 SUMMIT DR KATELLA ST LA MIRADA ST C AC 2 9 563 24 14,016 2/16/22 74 48 50 2 Surface Treatment - Slurry Seal 12/1/14 BAJA ST 6180545 BAJA ST CAPISTRANO AV END (N) E AC 2 9 660 25 16,500 2/15/22 75 73 25 2 Surface Treatment - Slurry Seal 12/1/14 THIRD S 6130058 THIRD ST MERMAID ST FOREST AV P AC 2 4 731 40 29,240 2/11/22 75 0 21 79 New Construction - AC 1/1/80 VAN D 6180193 VAN DYKE DR REMBRANDT DR NE END E AC 2 11 1,492 26 38,779 2/16/22 75 59 36 5 Surface Treatment - Slurry Seal 11/1/17 LORET 6370088 LORETTA DR BOLSANA DR SE END E AC 2 9 540 32 16,198 4/29/22 75 0 43 57 Surface Treatment - Slurry Seal 12/1/14 MOORE 6130008 MOOREA WY SKYLINE DR EAST END E AC 2 12 470 24 11,287 4/7/22 76 26 58 16 Surface Treatment - Slurry Seal 11/1/17
42 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date SUMMI 6180284 SUMMIT DR AGATE ST REMBRANDT DR C AC 2 11 512 28 14,330 2/16/22 76 74 26 0 Surface Treatment - Slurry Seal 11/1/17 CERRT 6180200 CERRTOS DR TEMPLE HILLS DR TERRACE WY E AC 2 8 428 34 14,562 4/6/22 76 50 44 6 Surface Treatment - Slurry Seal 12/1/14 CIRCL 6130765 CIRCLE WY CIRCLE WY @E WYE CIRCLE WY @N WYE E AC 1 7 381 28 10,668 2/15/22 76 54 40 6 New Construction - AC 1/1/91 DEL M 6180324 DEL MAR AV NORIA ST ORO ST C AC 2 9 230 25 5,750 2/15/22 76 68 32 0 Surface Treatment - Slurry Seal 12/1/14 OCEAN A 6130083 OCEAN AV COAST HY BEACH ST P AC 0 4 760 42 31,920 4/8/22 77 50 49 1 New Construction - AC 1/1/80 BALBOA AV 6180379 BALBOA AV CAPISTRANO AV DEL MAR AVE E AC 2 9 430 36 18,220 2/15/22 77 0 62 38 Surface Treatment - Slurry Seal 12/1/14 HILLC 6130464 HILLCREST DR BOAT CANYON DR PINECREST DR C AC 2 7 984 30 29,520 2/14/22 77 0 52 48 New Construction - AC 1/1/87 SAN R 6130239 SAN REMO DR TEMPLE HILLS DR SW TEMPLE HILLS DR NE E AC 2 8 1,336 24 32,056 4/6/22 77 69 31 0 Surface Treatment - Slurry Seal 12/1/14 LOWER 6130409 LOWER CLIFF DR CLIFF DR BEACH ST E AC 2 6 1,050 20 20,997 4/7/22 77 82 16 2 Surface Treatment - Slurry Seal 5/22/25 SUMMI 6180288 SUMMIT DR SUMMIT PL SUMMIT DR E AC 2 11 1,960 24 47,629 2/16/22 77 0 20 80 Surface Treatment - Slurry Seal 11/1/17 SEAVI 6180118 SEAVIEW ST AVALON AV WILSON ST E AC 2 13 398 30 11,940 2/10/22 77 34 36 30 Surface Treatment - Slurry Seal 11/1/16 BALBOA AV 6180378 BALBOA AV CORTEZ AV CAPISTRANO AV C AC 2 9 430 36 15,479 2/15/22 78 67 33 0 Surface Treatment - Slurry Seal 12/1/14 BARRACUDA 6370689 BARRACUDA WY SOUTH END BALBOA AV E AC 2 9 640 32 24,864 4/29/22 78 41 54 5 Surface Treatment - Slurry Seal 12/1/14 FEN W 6180018 FEN WY CUPRIEN WY ST ANNS DR E AAC 2 3 316 22 6,947 4/29/22 78 0 26 74 Overlay - AC Structural 1/1/22 CANYON VIE 7000003 CANYON VIEW DR BUENA VISTA DR END E AC 0 8 741 30 22,230 4/6/22 78 56 32 12 New Construction - AC 1/1/90 CERRT 6180204 CERRTOS DR TERRACE WY SW TERRACE WY NE E AC 2 8 1,542 34 52,429 4/6/22 78 42 35 23 Surface Treatment - Slurry Seal 12/1/14 MOUNT 6180476 MOUNTAIN RD COAST HY CATALINA ST E AC 2 10 566 42 23,772 2/10/22 78 52 22 26 Surface Treatment - Slurry Seal 11/1/16 ORO S 6180333 ORO ST CAPISTRANO AV DEL MAR AV E AC 2 9 430 25 10,750 2/15/22 79 0 80 20 Surface Treatment - Slurry Seal 12/1/14 ANITA ST 6180111 ANITA ST WILSON ST TEMPLE TE E AC 2 13 665 38 25,279 2/10/22 79 56 22 22 Surface Treatment - Slurry Seal 11/1/16 LEDRO 6130563 LEDROIT ST COAST HY LEDROIT ST E AC 2 7 550 32 17,600 4/7/22 79 33 40 27 New Construction - AC 1/1/82 PARK 6130216 PARK AV TAHITI AV HIDDEN VALLEY RD C AC 2 12 1,039 48 49,872 4/7/22 79 46 54 0 Surface Treatment - Slurry Seal 11/1/17 MERMA 6130068 MERMAID ST GLENNEYRE ST THIRD ST E AC 2 4 602 34 20,468 2/17/22 79 0 55 45 New Construction - AC 1/1/09 VISTA 6130035 VISTA LN MYSTIC WY SOUTH END E AC 2 12 550 20 11,002 4/8/22 79 66 34 0 Surface Treatment - Slurry Seal 11/1/17 DIAMO 6180674 DIAMOND ST CATALINA ST CRESTVIEW DR C AC 2 10 850 26 22,092 2/11/22 79 54 12 34 Surface Treatment - Slurry Seal 11/1/20 BLUEBIRD C 6180244 BLUEBIRD CANYON DR RANCHO LAGUNA RD CHAMBERLIN WY C AC 2 11 570 42 6,013 2/16/22 79 60 26 14 Surface Treatment - Slurry Seal 11/1/16 VIRGI PK 6130020 VIRGINIA PARK DR BLUMONT ST END P AC 2 12 928 24 22,272 4/8/22 79 60 34 6 Surface Treatment - Slurry Seal 11/1/17 SKYLI 6130112 SKYLINE DR MANZANITA DR VISTA LN C AC 2 12 1,279 30 38,355 4/7/22 80 39 30 31 Surface Treatment - Slurry Seal 11/1/17 ALTA LO 6370492 ALTA LOMA DR HOLLY DR CEANOTHUS DR P AC 0 1 493 16 7,888 2/18/22 80 0 47 53 Surface Treatment - Slurry Seal 10/1/19 ANITA ST 6180027 ANITA ST CATALINA ST WILSON ST E AC 2 13 804 38 30,552 2/16/22 80 38 62 0 Surface Treatment - Slurry Seal 11/1/16 Y PL 6130113 Y PL Y PL LOMA TERR E AC 1 4 174 18 3,137 4/8/22 80 58 38 4 New Construction - AC 1/1/10 MCKNI 6130707 MCKNIGHT DR COAST HY S END E AC 2 7 995 32 31,840 2/14/22 80 50 22 28 New Construction - AC 1/1/95 ROUNS 6370649 ROUNSEVEL TE ASHTON DR END E AC 2 8 760 30 10,031 4/7/22 80 0 75 25 Surface Treatment - Slurry Seal 11/1/16 MONTE 6130399 MONTEREY ST JASMINE ST HIGH DR C AC 1 6 1,221 30 36,630 2/14/22 80 0 35 65 Surface Treatment - Slurry Seal 5/22/25 OAK S 6180125 OAK ST WILSON ST TEMPLE TERR E AC 2 13 524 38 19,923 2/10/22 80 42 58 0 New Construction - AC 1/1/90 ROSA 6130343 ROSA BONHEUR CYPRESS DR CLIFF DR C AC 2 6 290 32 9,280 4/5/22 80 63 37 0 Surface Treatment - Slurry Seal 5/22/25 VICTO 6370578 VICTORIA DR SUNSET TE NYES PL E AC 2 8 730 26 18,980 4/29/22 80 90 7 3 Surface Treatment - Slurry Seal 11/1/16 ACACIA DR 6130319 ACACIA DR LINDEN ST CLIFF DR E AC 2 6 653 36 23,508 4/5/22 80 66 23 11 Surface Treatment - Slurry Seal 5/22/25 MANZA 6130109 MANZANITA DR LA VISTA DR SKYLINE DR E AC 2 12 812 36 29,230 4/8/22 80 52 33 15 Surface Treatment - Slurry Seal 11/1/17 MARIL 6370611 MARILYN DR OCEAN VIEW VISTA DR NORTH END E AC 2 1A 621 26 16,152 4/8/22 80 30 42 28 Surface Treatment - Slurry Seal 11/1/20 PARK 6130255 PARK AV WENDT TERR HIDDEN VALLEY CANYON RD C AC 2 12 3,300 42 138,600 4/5/22 80 45 52 3 Surface Treatment - Slurry Seal 11/1/17 CREST 6180708 CRESTVIEW DR CRESTVIEW PL DIAMOND ST E AC 2 11A 1,193 18 19,566 2/11/22 81 0 56 44 Surface Treatment - Slurry Seal 5/22/24 JASMI 6130336 JASMINE ST MONTEREY DR HIGH DR E AC 2 6 784 38 29,791 2/11/22 81 0 38 62 Surface Treatment - Slurry Seal 5/22/25 MIRAM 6180550 MIRAMAR ST CORTEZ AV DEL MAR AV E AC 2 9 860 25 21,500 2/15/22 81 49 22 29 Surface Treatment - Slurry Seal 12/1/14 BOLSA02 7000030 BOLSA WY CUPRIEN WAY END E AAC 0 3 271 30 8,130 4/29/22 81 49 16 35 Overlay - AC Structural 1/1/22 BROWNCROFT 6180145 BROWNCROFT RD ST ANNS DR GRIFFITH WY E AAC 2 3 314 28 8,793 4/29/22 81 54 32 14 Overlay - AC Structural 1/1/22 SUNSET TER 6370761 SUNSET TER COAST HWY VICTORIA DR P AC 0 8 737 30 22,110 4/29/22 81 45 12 43 Surface Treatment - Slurry Seal 11/1/16 DONNA 6130248 DONNA DR SAN REMO DR END E AC 2 8 142 22 3,130 4/6/22 81 59 41 0 New Construction - AC 1/1/71 POPLA 6130490 POPLAR ST HAROLD DR LOOKOUT DR E AC 2 6 225 38 8,536 2/11/22 81 0 28 72 Surface Treatment - Slurry Seal 5/22/25 ALTA VISTA 6370782 ALTA VISTA WAY GLENNEYRE ST QUEDA WY C AC 2 8 182 16 2,904 4/8/22 81 31 38 31 Surface Treatment - Slurry Seal 11/1/16 CREST 6180615 CRESTVIEW DR FERN ST NORTH END E AC 2 11A 781 24 18,752 4/7/22 81 12 14 74 Surface Treatment - Slurry Seal 5/22/24 CIRCL 6130764 CIRCLE WY CIRCLE WY @S WYE CIRCLE WY @E WYE E AC 1 7 343 28 9,606 2/15/22 81 0 59 41 New Construction - AC 1/1/84 CLEO 6180084 CLEO ST COAST HY GLENNEYRE ST E AC 2 3 348 36 12,528 2/17/22 81 13 31 56 New Construction - AC 1/1/77 ORIOL 6180168 ORIOLE DR ORIOLE DR EAST END E AC 2 11 40 28 1,118 2/16/22 81 0 100 0 New Construction - AC 1/1/76 REMBR 6180192 REMBRANDT DR VAN DYKE DR NORTH END E AC 2 11 1,101 18 19,825 2/16/22 81 63 20 17 Surface Treatment - Slurry Seal 11/1/17 BOAT CANYO 6130471 BOAT CANYON DR COAST HY HILLCREST DR E AC 2 7 681 34 23,169 2/14/22 81 0 76 24 New Construction - AC 1/1/09 SOLAN 6370710 SOLANA WY ALTA VISTA WY VICTORIA PL E AC 2 8 504 24 12,096 4/8/22 81 60 34 6 Surface Treatment - Slurry Seal 11/1/16 CAPIS 6180532 CAPISTRANO AV NORIA ST ORO ST E AC 2 9 230 25 5,750 2/15/22 81 62 38 0 Surface Treatment - Slurry Seal 12/1/14 DOLPH 6130468 DOLPHIN WY SW END HILLCREST DR E AC 2 7 468 22 10,293 2/14/22 81 83 17 0 New Construction - AC 1/1/09 TEMPL TER 6180113 TEMPLE TERR OAK ST THALIA ST E AC 2 13 811 31 25,141 2/10/22 81 41 30 29 New Construction - AC 1/1/80 TERRA 6180205 TERRACE WY CERRITOS DR S CERRITOS DR N P AC 2 8 1,939 29 56,231 4/6/22 81 51 45 4 New Construction - AC 1/1/80 COAST VIEW 7000001 COAST VIEW DR TEMPLE HILLS DR END E AC 2 8 2,009 30 60,270 4/29/22 81 90 10 0 Surface Treatment - Slurry Seal 12/1/14 LEDRO 6130578 LEDROIT ST LEDROIT ST @WYE SUNSET RIDGE DR E AC 2 7 892 32 28,546 4/7/22 81 13 32 55 New Construction - AC 1/1/87 PANOR 6130588 PANORAMA DR SUNSET RIDGE DR ELEANOR LN E AC 2 7 847 26 22,022 2/14/22 82 37 43 20 New Construction - AC 1/1/81 HAWTH 6130309 HAWTHORNE RD CYPRESS DR MONTEREY DR E AC 2 6 623 36 22,428 2/11/22 82 11 47 42 Surface Treatment - Slurry Seal 5/22/25 LOOKO 6130491 LOOKOUT DR POPLAR ST END E AC 2 6 497 30 14,910 2/11/22 82 51 49 0 Surface Treatment - Slurry Seal 5/22/25 SLEEP 6180080 SLEEPY HOLLOW LN CLEO ST COAST HY E AAC 2 3 763 22 16,784 4/6/22 82 50 44 6 Overlay - AC Structural 1/1/22 CREST 6180616 CRESTVIEW DR CRESTVIEW PL FERN ST E AC 2 11A 508 32 20,288 2/11/22 82 0 36 64 Surface Treatment - Slurry Seal 5/22/24 RADCL 6180628 RADCLIFF CT SW END CATALINA ST E AC 1 10 175 22 3,850 2/11/22 82 0 52 48 Surface Treatment - Slurry Seal 11/1/16 RUBY 6180678 RUBY ST GLENNEYRE ST RUBY PL E AC 2 10 516 24 12,384 2/11/22 82 54 46 0 Surface Treatment - Slurry Seal 11/1/16 STARL 6180195 STARLIT DR MORNINGSIDE DR END E AC 2 11 1,181 32 37,792 2/16/22 82 12 28 60 Surface Treatment - Slurry Seal 11/1/16 CREST PL 6180707 CRESTVIEW PL CRESTVIEW DR END P AC 2 11A 913 20 18,260 4/7/22 82 23 38 39 Surface Treatment - Slurry Seal 5/22/24 ST AN 6180096 ST ANNS DR GLENNEYRE ST CATALINA ST E AAC 2 3 354 36 12,728 4/6/22 82 68 30 2 Overlay - AC Structural 4/1/22 TAHIT 6130017 TAHITI AV CARIBBEAN WY PARK AV E AC 2 12 523 28 14,651 4/7/22 83 27 67 6 Surface Treatment - Slurry Seal 11/1/17
43 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date UPLAN 6370743 UPLAND RD COAST HY GLENNEYRE ST P AC 2 10 345 31 10,695 4/7/22 83 21 57 22 Surface Treatment - Slurry Seal 11/1/20 ASTER ST 6130346 ASTER ST COAST HY CYPRESS DR E AC 2 6 322 36 11,592 4/7/22 83 85 15 0 Surface Treatment - Slurry Seal 5/22/25 DEL M 6180543 DEL MAR AV BAJA ST KATELLA ST C AC 2 9 230 25 5,750 2/15/22 83 48 46 6 Surface Treatment - Slurry Seal 12/1/14 SKYLI 6130004 SKYLINE DR ATLANTIC WY EAST END C AC 2 12 169 36 6,089 4/7/22 83 52 46 2 Surface Treatment - Slurry Seal 11/1/17 FIRST 6370317 FIRST AV MAR VISTA AVE SE END P AC 0 1 409 30 12,270 4/8/22 83 51 47 2 Surface Treatment - Slurry Seal 10/1/19 DUNNE 6130502 DUNNEGAN DR NW END DUNNEGAN DR E AC 2 7 391 26 10,172 2/11/22 83 64 27 9 New Construction - AC 1/1/96 SEAVI 6180115 SEAVIEW ST WILSON ST TEMPLE TERR E AC 2 13 812 30 24,373 2/10/22 83 0 64 36 Surface Treatment - Slurry Seal 11/1/16 HIGH 6130482 HIGH DR ACACIA DR POPLAR ST C AC 2 6 1,223 32 39,136 2/11/22 83 33 39 28 Surface Treatment - Slurry Seal 5/22/25 LA VI 6130021 LA VISTA DR NW END MANZANITA DR E AC 2 12 407 22 8,949 4/8/22 83 13 58 29 Surface Treatment - Slurry Seal 11/1/17 OLIVE 6130277 OLIVE ST HIGH DR NE END E AC 2 6 283 30 8,500 2/11/22 83 0 32 68 Surface Treatment - Slurry Seal 5/22/25 RICO 6370473 RICO RD PASEO DEL SUR EAST END E AC 2 1 269 28 7,524 4/8/22 83 18 82 0 Surface Treatment - Slurry Seal 10/1/19 LAGUN AV 6180099 LAGUNA AV COAST HY EL PASEO ST P PCC 2 0 148 30 4,440 4/29/22 83 25 42 33 New Construction - PCC 6/1/99 LOMA 6130119 LOMA TERR THIRD ST LOMA TE E AC 2 4 185 26 4,811 2/17/22 83 0 80 20 New Construction - AC 1/1/81 NIDO 6370787 NIDO WY ALTA VISTA WY END E AC 2 8 715 26 16,172 4/8/22 83 67 13 20 Surface Treatment - Slurry Seal 11/1/16 MAGNO 6130293 MAGNOLIA DR JASMINE ST ASTER ST E AC 2 6 640 30 19,200 2/11/22 83 36 29 35 Surface Treatment - Slurry Seal 5/22/25 EAGLE RK 6370365 EAGLE ROCK WY SCENIC DR MAR VISTA AV E AC 2 1 230 28 6,440 2/18/22 84 0 27 73 Surface Treatment - Slurry Seal 10/1/19 MYSTI LN 6130019 MYSTIC LN MYSTIC WY END P AC 0 12 177 18 3,186 4/8/22 84 10 86 4 Surface Treatment - Slurry Seal 11/1/17 NYES 6370619 NYES PL END (S) COAST HWY C AC 2 8 315 30 9,450 4/8/22 84 55 29 16 Surface Treatment - Slurry Seal 11/1/16 SOLAN 6370555 SOLANA WY COAST HY ALTA VISTA WY E AC 2 8 706 26 18,355 4/8/22 84 46 28 26 Surface Treatment - Slurry Seal 11/1/16 VISTA 6130015 VISTA LN VISTA LN EAST END E AC 2 12 242 22 5,319 4/8/22 84 24 72 4 Surface Treatment - Slurry Seal 11/1/17 CERRT 6180177 CERRTOS DR TERRACE WY EAST END E AC 2 8 390 34 13,249 4/6/22 84 59 39 2 Surface Treatment - Slurry Seal 12/1/14 OCEAN VIEW 6370625 OCEAN VIEW VISTA DR DRIFTWOOD DR END P AC 0 1A 1,007 31 31,217 4/8/22 84 19 43 38 Surface Treatment - Slurry Seal 11/1/20 PALA 6370561 PALA WY ALTA VISTA WY AVENUE W E AC 1 8 363 14 5,083 4/8/22 84 0 86 14 Surface Treatment - Slurry Seal 11/1/16 BALBOA AV 6370735 BALBOA AV KENDAL DR BOLSANA DR C AC 2 9 1,056 36 38,011 2/15/22 84 0 68 32 Surface Treatment - Slurry Seal 12/1/14 HOLLY 6130295 HOLLY DR CYPRESS DR MONTEREY DR E AC 2 6 625 36 22,500 2/11/22 84 0 34 66 Surface Treatment - Slurry Seal 5/22/25 MORNI 6180246 MORNINGSIDE DR LAVENDER LN BLUEBIRD CANYON DR E AC 2 11 1,353 32 43,296 2/16/22 84 64 36 0 Surface Treatment - Slurry Seal 11/1/16 ATLANTIC W 6130042 ATLANTIC WY CARIBBEAN WY END E AC 2 12 239 26 6,214 4/7/22 84 39 61 0 Surface Treatment - Slurry Seal 11/1/17 HIGH 6130373 HIGH DR MONTEREY DR JASMINE ST C AC 2 6 1,559 32 49,888 2/11/22 84 32 25 43 Surface Treatment - Slurry Seal 5/22/25 HIGHL WY 6370709 HIGHLAND WY HIGHLAND RD WY NYES PL E AC 2 8 475 22 10,441 4/29/22 84 60 29 11 Surface Treatment - Slurry Seal 11/1/16 HOLLY 6130347 HOLLY DR MONTEREY DR HIGH DR E AC 2 6 770 36 27,717 2/11/22 84 0 83 17 Surface Treatment - Slurry Seal 5/22/25 CAPIS 6180556 CAPISTRANO AV SAN JOSE ST BAJA ST E AC 2 9 230 25 6,440 2/15/22 84 44 56 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180325 DEL MAR AV MIRAMAR ST NORIA ST C AC 2 9 230 25 5,750 2/15/22 84 72 28 0 Surface Treatment - Slurry Seal 12/1/14 HIGHL RD 6370708 HIGHLAND RD SOLANA WY END P AC 0 8 349 30 11,040 4/29/22 84 48 25 27 Surface Treatment - Slurry Seal 11/1/16 MOUNT 6180456 MOUNTAIN RD CATALINA ST CRESS ST E AC 2 10 944 42 39,648 2/10/22 84 19 31 50 Surface Treatment - Slurry Seal 11/1/16 VICTO 7000000 VICTORIA DR HIGHLAND WY COAST HWY E AC 2 8 202 24 4,728 4/8/22 84 44 48 8 Surface Treatment - Slurry Seal 11/1/16 HAWTH 6130402 HAWTHORNE RD MONTEREY DR HIGH DR E AC 2 6 454 36 16,326 2/11/22 84 0 28 72 Surface Treatment - Slurry Seal 5/22/25 MYSTI 6130096 MYSTIC WY HILLEDGE DR VISTA LN E AC 2 12 1,359 36 48,924 4/8/22 84 52 46 2 Surface Treatment - Slurry Seal 11/1/17 PELIC 6370682 PELICAN ST GULL CL NORTH END E AC 2 9 376 24 9,022 2/18/22 84 40 41 19 Surface Treatment - Slurry Seal 12/1/14 SKYLI 6130048 SKYLINE DR CORONADO DR SAMOA WY C AC 2 12 1,809 38 68,742 4/7/22 84 38 62 0 Surface Treatment - Slurry Seal 11/1/17 CAPIS 6180351 CAPISTRANO AV ACAPULCO ST SANTA ANA ST E AC 1 9 230 20 5,980 2/15/22 84 69 29 2 Surface Treatment - Slurry Seal 12/1/14 JUANI 6370694 JUANITA WY ALTA VISTA WY END E AC 2 8 578 26 15,028 2/15/22 84 0 26 74 Surface Treatment - Slurry Seal 11/1/16 SKYLI 6130053 SKYLINE DR VISTA LN CORONADO DR C AC 2 12 1,138 38 43,244 4/7/22 84 39 55 6 Surface Treatment - Slurry Seal 11/1/17 VIA C 6130698 VIA CAPRI MCKNIGHT DR SE END E AC 2 7 172 28 4,821 2/14/22 85 0 45 55 New Construction - AC 1/1/95 MADIS 6180206 MADISON PL BLUEBIRD CANYON DR END E AC 2 11 701 26 19,426 2/16/22 85 0 33 67 Surface Treatment - Slurry Seal 11/1/16 WILSO 6180123 WILSON ST LOMBARDY LN ANITA ST E AC 2 13 105 26 2,723 2/16/22 85 56 44 0 New Construction - AC 1/1/10 SANJOAQ 6370266 SAN JOAQUIN COAST HY HILLCREST DR P AC 0 7 620 26 16,120 2/14/22 85 0 35 65 New Construction - AC 1/1/80 CLIFF 6130758 CLIFF DR CIRCLE WY COAST HY P AC 0 7 408 32 13,056 2/15/22 85 44 31 25 New Construction - AC 1/1/80 ANITA ST 6180420 ANITA ST GAVIOTA DR COAST HY E AC 2 13 145 38 5,510 2/16/22 85 0 100 0 Surface Treatment - Slurry Seal 11/1/16 CATAL 6180516 CATALINA ST BROOKS ST THALIA ST E AC 2 13 1,129 44 49,676 2/10/22 85 73 27 0 New Construction - AC 1/1/03 MORNI 6180250 MORNINGSIDE DR RANCHO LAGUNA RD STARLIT DR E AC 2 11 2,248 32 71,952 2/16/22 85 0 83 17 Surface Treatment - Slurry Seal 11/1/16 OCEAN FRO 6180509 OCEAN FRONT BROOKS ST END P AC 2 13 408 20 8,160 4/8/22 85 75 4 21 New Construction - AC 1/1/80 REGAT 6180251 REGATTA RD BLUEBIRD CANYON DR SW BLUEBIRD CANYON DR NE E AC 2 11 1,001 26 26,035 2/16/22 85 27 32 41 Surface Treatment - Slurry Seal 11/1/16 TERRY 6370647 TERRY RD HINKLE PL W END E AC 2 8 458 28 10,920 4/7/22 85 48 37 15 Surface Treatment - Slurry Seal 11/1/16 LA MI 6180540 LA MIRADA ST CORTEZ AV DEL MAR AV C AC 2 9 860 25 21,500 2/15/22 85 56 44 0 Surface Treatment - Slurry Seal 12/1/14 BAYVIEW PL 6180180 BAYVIEW PL TEMPLE HILLS DR NORTH END E AC 2 8 826 18 16,317 4/6/22 85 62 36 2 Surface Treatment - Slurry Seal 12/1/14 DARTM 6130558 DARTMOOR ST CAMDEN PL DUNNEGAN DR E AC 2 7 651 36 23,427 2/11/22 85 0 48 52 New Construction - AC 1/1/08 KATEL 6180554 KATELLA ST CAPISTRANO AV END (N) E AC 2 9 859 25 18,300 2/15/22 85 37 36 27 Surface Treatment - Slurry Seal 12/1/14 SUNSE 6130580 SUNSET AV LEDROIT ST SUNSET RIDGE DR @WYE E AC 2 7 424 30 12,720 2/14/22 85 49 32 19 New Construction - AC 1/1/92 DARTM 6130557 DARTMOOR ST HILLCREST DR CAMDEN PL E AC 2 7 715 36 25,746 2/11/22 86 0 28 72 New Construction - AC 1/1/85 HIGH 6130380 HIGH DR COAST HY MONTEREY DR C AC 2 6 1,100 30 33,000 2/14/22 86 0 68 32 Surface Treatment - Slurry Seal 5/22/25 HILLV 6130175 HILLVIEW DR HILLVIEW DR @WYE EAST END E AC 2 2 242 24 5,806 4/7/22 86 19 70 11 Surface Treatment - Slurry Seal 9/1/21 TERRY 6370655 TERRY RD SE END HINKLE PL E AC 2 8 311 28 8,704 4/7/22 86 16 28 56 Surface Treatment - Slurry Seal 11/1/16 VALID 6370479 VALIDO RD WEST ST TOTO LOMA LN E AC 2 1 176 28 4,936 4/8/22 86 0 85 15 Surface Treatment - Slurry Seal 10/1/19 ANACAPA WY 6130051 ANACAPA WY WEST END SKYLINE DR E AC 2 12 1,616 20 32,311 4/7/22 86 43 37 20 Surface Treatment - Slurry Seal 11/1/17 CRESC 6130730 CRESCENT BAY DR CRESCENT BAY DR @E WYE CRESCENT BAY DR @N WYE E AC 2 7 461 30 13,825 2/14/22 86 0 100 0 New Construction - AC 1/1/90 ASHTON DR 6370642 ASHTON DR ROUNSEVEL TE END E AC 2 8 294 18 4,235 4/7/22 86 20 76 4 Surface Treatment - Slurry Seal 11/1/16 BALBOA AV 6370717 BALBOA AV NYES PL KENDAL DR C AC 2 9 493 36 17,748 2/15/22 86 0 100 0 Surface Treatment - Slurry Seal 12/1/14 GALEN 6180495 GALEN DR BLUEBIRD CANYON DR END E AC 2 10 493 24 11,833 2/16/22 86 0 31 69 Surface Treatment - Slurry Seal 11/1/16 MARIL 6370628 MARILYN DR WESLEY DR OCEAN VIEW VISTA DR E AC 2 1A 741 32 23,709 4/8/22 86 62 38 0 Surface Treatment - Slurry Seal 11/1/20 WILSO 6180026 WILSON ST THALIA ST GRACELAND DR E AAC 2 3 250 40 10,015 2/10/22 86 42 17 41 Overlay - AC Structural 1/1/22 CAPIS 6180553 CAPISTRANO AV BAJA ST KATELLA ST E AC 2 9 230 25 6,440 2/15/22 86 51 49 0 Surface Treatment - Slurry Seal 12/1/14 CRESC 6130715 CRESCENT BAY DR EAST END CRESCENT BAY DR @S WYE E AC 2 7 276 30 8,274 2/14/22 86 0 51 49 New Construction - AC 1/1/87 DRIFT 6370612 DRIFTWOOD DR OCEAN VIEW VISTA DR NORTH END E AC 2 1A 544 26 14,132 4/8/22 86 0 39 61 Surface Treatment - Slurry Seal 11/1/20
44 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date ARCH ST 6370747 ARCH ST GLENNEYRE ST END E AC 2 10 310 38 6,688 4/7/22 86 20 75 5 Surface Treatment - Slurry Seal 11/1/20 LAGUN 6130143 LAGUNA CYN RD FRONTAGE LAGUNA CANYON RD WOODLAND DR E AC 1 13 1,305 34 44,363 4/4/22 86 17 52 31 New Construction - AC 1/1/10 LEDRO 6130581 LEDROIT ST LEDROIT ST @WYE SE END E AC 2 7 129 46 5,939 2/14/22 86 0 100 0 New Construction - AC 1/1/07 MAR V 6370434 MAR VISTA AVE EAGLEROCK WY END E AC 2 1 340 26 8,840 4/8/22 86 80 17 3 Surface Treatment - Slurry Seal 10/1/19 BALBOA AV 6370764 BALBOA AV BOLSANA DR BARRACUDA WY C AC 2 9 303 36 10,913 2/15/22 87 40 60 0 Surface Treatment - Slurry Seal 12/1/14 CHIQU 6130733 CHIQUITA ST CLIFF DR COAST HY E AC 2 7 513 32 16,404 2/17/22 87 0 29 71 New Construction - AC 1/1/07 GAINS 6180617 GAINSBOROUGH DR SW END GAINSBOROUGH WY E AC 2 11A 610 22 13,420 4/29/22 87 0 29 71 Surface Treatment - Slurry Seal 5/22/24 BLUEBIRD C 6180256 BLUEBIRD CANYON DR ORIOLE DR RANCHO LAGUNA RD C AC 2 11 1,518 38 32,717 2/16/22 87 53 47 0 Surface Treatment - Slurry Seal 11/1/17 POPLA 6130265 POPLAR ST CYPRESS DR MONTEREY DR E AC 2 6 492 38 18,703 2/14/22 87 51 21 28 Surface Treatment - Slurry Seal 5/22/25 LOS R 6180095 LOS ROBLES EL CAMINO DEL MAR EL BOSQUE E AAC 2 3 769 36 27,684 2/17/22 87 0 28 72 Overlay - AC Structural 1/1/22 BROOKS ST 6370529 BROOKS ST PEDRO ST SE PEDRO ST NW E AC 2 1 1,250 24 30,000 2/18/22 87 0 30 70 Surface Treatment - Slurry Seal 10/1/19 SAMOA 6130005 SAMOA WY SKYLINE DR END E AC 2 12 293 22 6,446 4/7/22 87 0 96 4 Surface Treatment - Slurry Seal 11/1/17 HILLC 6130573 HILLCREST DR CHIQUITA ST SAN JOAQUIN ST C AC 2 7 853 34 29,002 2/14/22 87 0 100 0 New Construction - AC 1/1/10 PALM 6130177 PALM DR TEMPLE HILLS DR NE END E AC 2 8 367 30 11,019 4/6/22 87 46 35 19 Surface Treatment - Slurry Seal 12/1/14 ALTA VISTA 6370790 ALTA VISTA WAY PALA WY NIDO WY C AC 2 8 481 14 3,396 4/8/22 87 43 53 4 Surface Treatment - Slurry Seal 11/1/16 OCEAN VIEW 6370629 OCEAN VIEW VISTA DR MARILYN DR DRIFTWOOD DR P AC 2 1A 407 31 12,617 4/8/22 87 24 68 8 Surface Treatment - Slurry Seal 11/1/20 CLIFF 6130410 CLIFF DR JASMINE ST COAST HY P AC 0 7 893 42 37,506 2/17/22 87 0 100 0 New Construction - AC 1/1/80 HILLE 6130097 HILLEDGE DR BLUMONT ST MYSTIC WY E AC 2 12 879 28 24,612 4/8/22 87 27 69 4 Surface Treatment - Slurry Seal 11/1/17 LOCUS 6130312 LOCUST ST MONTEREY DR HIGH DR E AC 2 6 716 36 25,760 2/11/22 87 38 44 18 Surface Treatment - Slurry Seal 5/22/25 CAJON 6130506 CAJON ST HILLCREST DR NE END E AC 2 7 219 18 3,937 2/11/22 87 0 100 0 New Construction - AC 1/1/00 HILLC 6130584 HILLCREST DR LOUISE ST LEDROIT ST E AC 2 7 669 32 21,420 2/14/22 87 30 29 41 New Construction - AC 1/1/96 SUMMI 6180300 SUMMIT DR BLUEBIRD CANYON DR AGATE ST C AC 2 11 250 22 5,500 2/16/22 87 17 49 34 Surface Treatment - Slurry Seal 11/1/17 ENCIN 6370725 ENCINA WY FONTANA WY END E AC 1 8 145 20 2,900 2/15/22 88 0 49 51 Surface Treatment - Slurry Seal 11/1/16 MONTE 6130396 MONTEREY ST LINDEN ST JASMINE ST C AC 1 6 1,280 30 38,400 2/14/22 88 0 46 54 Surface Treatment - Slurry Seal 5/22/25 NYES 6370669 NYES PL COAST HWY HIGHLAND WY C AC 2 8 215 30 6,450 4/8/22 88 36 64 0 Surface Treatment - Slurry Seal 11/1/16 VIEJO 6130577 VIEJO ST COAST HY HILLCREST DR E AC 2 7 620 32 19,840 2/14/22 88 42 58 0 New Construction - AC 1/1/85 WINDS 6130500 WINDSOR PL DUNNEGAN DR SE END E AC 2 7 173 28 4,844 2/11/22 88 0 45 55 New Construction - AC 1/1/82 ALTA VISTA 6370766 ALTA VISTA WAY FONTANA WY IRIS WY C AC 2 8 120 20 2,398 2/15/22 88 0 100 0 Surface Treatment - Slurry Seal 11/1/16 VIRGI 6370259 VIRGINIA WY NINTH AV SUNSET AV E AC 2 1 678 22 14,916 2/18/22 88 0 50 50 Surface Treatment - Slurry Seal 10/1/19 ALTA VISTA 6370783 ALTA VISTA WAY HIGHLAND RD GLENNEYRE ST C AC 2 8 110 18 1,975 4/8/22 88 43 57 0 Surface Treatment - Slurry Seal 11/1/16 ARCH ST 6370742 ARCH ST GLENNEYRE ST CATALINA ST C AC 2 10 120 38 4,560 4/7/22 88 41 51 8 Surface Treatment - Slurry Seal 11/1/20 HILLC 6130656 HILLCREST DR PINECREST DR CHIQUITA ST C AC 2 7 707 34 24,038 2/14/22 88 0 52 48 New Construction - AC 1/1/90 SKYLI 6130043 SKYLINE DR SAMOA WY PACIFIC AV C AC 2 12 863 36 31,074 4/7/22 88 24 74 2 Surface Treatment - Slurry Seal 11/1/17 CLIFF 6130741 CLIFF DR CLIFF DR COAST HY P AC 2 7 308 30 9,240 2/17/22 88 0 58 42 New Construction - AC 1/1/80 OSGOO 6180627 OSGOOD CT CATALINA ST NE END E AC 1 10 275 18 4,950 4/29/22 88 0 100 0 Surface Treatment - Slurry Seal 11/1/20 PACVISTA 6180632 PACIFIC VISTA GAINSBOROUGH DR END P AC 2 9 485 18 8,730 4/29/22 88 0 32 68 Surface Treatment - Slurry Seal 5/22/24 CORTE 6180559 CORTEZ AV BAJA ST KATELLA ST E AC 2 9 230 22 4,268 2/15/22 88 44 56 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180340 DEL MAR AV SANTA ANA ST TIA JUANA ST C AC 2 9 230 36 8,280 2/15/22 88 0 100 0 Surface Treatment - Slurry Seal 12/1/14 REMBR 6180286 REMBRANDT DR VAN DYKE DR SUMMIT DR E AC 2 11 67 24 1,598 4/29/22 88 59 41 0 Surface Treatment - Slurry Seal 11/1/17 RANCHO LAG 6180260 RANCHO LAGUNA RD BLUEBIRD CANYON DR MORNINGSIDE DR P AC 2 11 575 31 17,825 2/16/22 88 19 81 0 Surface Treatment - Slurry Seal 11/1/16 POPLA 6130394 POPLAR ST MONTEREY DR HIGH DR E AC 2 6 715 38 27,169 2/11/22 88 0 54 46 Surface Treatment - Slurry Seal 5/22/25 SUMMI 6180287 SUMMIT DR PEARL ST DIAMOND ST C AC 2 11 576 32 18,424 2/16/22 88 49 51 0 Surface Treatment - Slurry Seal 11/1/17 CRESC 6130705 CRESCENT BAY DR COAST HY CRESCENT BAY DR E AC 2 7 718 28 20,104 2/14/22 88 0 68 32 New Construction - AC 1/1/89 CRESS 6180512 CRESS ST BRANGWYN WY BLUEBIRD CANYON DR C AC 2 13 1,086 40 43,440 2/16/22 88 34 47 19 New Construction - AC 1/1/10 DORN 6130180 DORN CT SOUTH END TEMPLE HILLS DR E AC 2 2 558 28 15,634 4/6/22 88 0 16 84 Surface Treatment - Slurry Seal 9/15/21 DRIFT 6370609 DRIFTWOOD DR WESLEY DR OCEAN VIEW VISTA DR E AC 2 1A 628 26 16,315 4/8/22 88 0 45 55 Surface Treatment - Slurry Seal 11/1/20 DUMON 6370668 DUMOND DR MARION WY VICTORIA DR E AC 2 8 344 34 11,683 4/29/22 88 60 7 33 Surface Treatment - Slurry Seal 11/1/16 MARIN 6130747 MARINE DR CLIFF DR CLIFF DR E AC 2 7 795 34 27,030 4/7/22 88 49 24 27 New Construction - AC 1/1/02 ORIOL 6180253 ORIOLE DR BLUEBIRD CANYON DR FLAMIINGO RD E AC 2 11 1,179 32 37,728 2/16/22 89 0 90 10 Surface Treatment - Slurry Seal 11/1/17 CIRCL 6130766 CIRCLE WY CIRCLE WY @S WYE CIRCLE WY @N WYE E AC 1 7 293 28 8,208 2/15/22 89 0 34 66 New Construction - AC 1/1/85 TIA J 6180343 TIA JUANA ST CAPISTRANO AV DEL MAR AV E AC 2 9 430 20 8,600 2/15/22 89 0 36 64 Surface Treatment - Slurry Seal 12/1/14 VIRGI 6370400 VIRGINIA WY THIRD AV EAGLEROCK WY E AC 2 1 600 20 12,000 2/18/22 89 0 42 58 Surface Treatment - Slurry Seal 10/1/19 BRANGWYM W 6180513 BRANGWYM WY CRESS ST BROOKS ST E AC 2 13 371 34 12,605 4/29/22 89 84 16 0 New Construction - AC 1/1/10 CARIB 6130038 CARIBBEAN WY CORAL DR ATLANTIC WY E AC 2 12 1,144 34 38,896 4/7/22 89 25 75 0 Surface Treatment - Slurry Seal 11/1/17 CATAL 6180658 CATALINA ST OSGOOD CT BLUEBIRD CANYON DR E AC 2 10 1,500 34 51,000 2/10/22 89 0 44 56 Surface Treatment - Slurry Seal 11/1/20 CENTE 6180696 CENTER ST CARMELITA ST PEARL ST E AC 2 10 545 30 16,344 2/10/22 89 0 36 64 Surface Treatment - Slurry Seal 11/1/20 DEL M 6180338 DEL MAR AV ORO ST SANTA ANA ST C AC 2 9 920 36 33,120 2/15/22 89 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BLUEBIRD C 6180218 BLUEBIRD CANYON DR KELLER WY BLUEBIRD CANYON / REGATTA RD C AC 2 11 378 28 6,047 2/16/22 89 0 100 0 Surface Treatment - Slurry Seal 11/1/16 VICTO 6370573 VICTORIA DR COAST HWY SUNSET TE E AC 2 8 1,028 26 26,738 4/29/22 89 34 22 44 Surface Treatment - Slurry Seal 11/1/16 CARIB 6130040 CARIBBEAN WY ATLANTIC WY TAHITI AV E AC 2 12 508 34 17,273 4/7/22 89 24 73 3 Surface Treatment - Slurry Seal 11/1/17 SHADO 6180462 SHADOW LN CATALINA ST CARMELITA ST E AC 2 10 499 44 21,956 2/10/22 89 48 23 29 Surface Treatment - Slurry Seal 11/1/16 TIA J 6180368 TIA JUANA ST END CORTEZ AV E AC 2 9 152 20 3,040 2/15/22 89 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BERN DR 6130214 BERN DR PARK AV SW PARK AV NE E AC 2 2 1,833 28 51,318 4/5/22 89 0 98 2 Surface Treatment - Slurry Seal 9/15/21 SKYLI 6130041 SKYLINE DR PACIFIC AV ATLANTIC WY C AC 2 12 1,033 34 35,116 4/7/22 89 0 100 0 Surface Treatment - Slurry Seal 11/1/17 TAHIT 6130039 TAHITI AV CORAL DR CARIBBEAN WY E AC 2 12 1,551 28 43,419 4/7/22 89 0 93 7 Surface Treatment - Slurry Seal 11/1/17 CENTE 6180665 CENTER ST CATALINA ST CARMELITA ST E AC 2 10 363 48 17,424 2/10/22 89 0 30 70 Surface Treatment - Slurry Seal 11/1/20 FONTA 6370767 FONTANA WY ALTA VISTA WY ENCINA WY E AC 2 8 187 24 4,486 2/15/22 89 0 30 70 Surface Treatment - Slurry Seal 11/1/16 GAINS 6180709 GAINSBOROUGH DR GAINSBOROUGH PL DIAMOND ST E AC 2 11A 520 22 11,431 4/29/22 89 0 41 59 Surface Treatment - Slurry Seal 5/22/24 BEVERLY ST 6130461 BEVERLY ST COAST HY HILLCREST DR E AC 2 7 602 30 18,068 2/14/22 89 0 100 0 New Construction - AC 1/1/10 DIAMO 6180710 DIAMOND ST CRESTVIEW DR END C AC 2 11A 1,181 34 40,154 2/11/22 89 43 32 25 Surface Treatment - Slurry Seal 5/22/24 LA MI 6180330 LA MIRADA ST DEL MAR AV ENSENADA AV C AC 2 9 430 25 12,450 2/15/22 89 0 100 0 Surface Treatment - Slurry Seal 12/1/14 OCEAN 6180644 OCEAN WY PEARL ST DIAMOND ST E AC 2 10 750 36 27,015 2/17/22 89 0 44 56 Surface Treatment - Slurry Seal 11/1/16 WEST 6370363 WEST ST MONTEREY ST VALIDO RD E AC 2 1 1,065 28 29,820 2/18/22 89 0 57 43 Surface Treatment - Slurry Seal 10/1/19
45 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date ALTA VISTA 6370718 ALTA VISTA WAY LOMITA WY KILO WY C AC 2 8 807 20 16,140 4/8/22 89 0 70 30 Surface Treatment - Slurry Seal 11/1/16 BLUMONT ST 6130094 BLUMONT ST PARK AV END E AC 2 12 823 32 26,336 4/8/22 89 21 41 38 Surface Treatment - Slurry Seal 11/1/17 SHORT 6180073 SHORT ST LEGION ST EL CAMINO DEL MAR E AAC 2 3 402 40 16,082 4/4/22 89 61 39 0 Overlay - AC Structural 1/1/22 SUMMI 6180188 SUMMIT DR SW END SUMMIT WY E AC 2 11 258 22 5,665 2/16/22 89 68 28 4 Surface Treatment - Slurry Seal 11/1/17 TEMPL 6180274 TEMPLE HILLS DR DUNNING DR BAYVIEW PL C AC 2 8 1,290 26 33,540 4/6/22 89 30 65 5 New Construction - AC 1/1/92 ASTER ST 6130354 ASTER ST CYPRESS DR MONTEREY DR E AC 2 6 620 36 22,320 2/11/22 90 0 54 46 Surface Treatment - Slurry Seal 5/22/25 BONVUE TE 6130278 BONVUE TE HIGH DR NORTH END E AC 2 6 456 24 10,947 4/5/22 90 24 37 39 Surface Treatment - Slurry Seal 5/22/25 CEDAR 6130379 CEDAR WY HIGH DR JASMINE ST E AC 2 6 1,094 28 30,632 4/5/22 90 22 45 33 Surface Treatment - Slurry Seal 5/22/25 CLIFF 6130443 CLIFF DR BEVERLY ST HIGH DR P AC 2 7 839 42 35,238 2/17/22 90 0 100 0 New Construction - AC 1/1/80 DUMON 6370627 DUMOND DR OCEAN FRONT WARDS TE E AC 2 8 190 12 2,280 4/29/22 90 0 6 94 Surface Treatment - Slurry Seal 11/1/16 OSGOO 6180626 OSGOOD CT SW END CATALINA ST E AC 1 10 175 18 3,150 4/29/22 90 0 100 0 Surface Treatment - Slurry Seal 11/1/20 SECON 6370386 SECOND AV COAST HY VIRGINIA WY E AC 2 1 200 36 7,201 2/18/22 90 0 100 0 Surface Treatment - Slurry Seal 10/1/19 HOLLY 6370483 HOLLY DR ALTA LOMA DR NORTH END E AC 2 1 1,565 26 40,686 2/18/22 90 41 43 16 Surface Treatment - Slurry Seal 10/1/19 PARK 6130215 PARK AV BERN DR S ALTA LAGUNA BLVD C AC 2 2 598 64 38,272 4/5/22 90 0 100 0 Surface Treatment - Slurry Seal 9/15/21 GRIFF WY 6180005 GRIFFITH WY WENDT TERR END P AAC 0 3 747 31 23,157 4/29/22 90 56 19 25 Overlay - AC Structural 1/1/22 MORNI 6180248 MORNINGSIDE DR STARLIT DR LAVENDER LN E AC 2 11 1,327 32 42,464 2/16/22 90 0 60 40 Surface Treatment - Slurry Seal 11/1/16 ENSEN 6180369 ENSENADA AV LA MIRADA ST NORIA ST E AC 2 9 440 20 8,800 2/15/22 90 0 100 0 Surface Treatment - Slurry Seal 12/1/14 HILLC 6130587 HILLCREST DR NW END LOUISE ST E AC 2 7 148 32 4,748 2/14/22 90 40 40 20 New Construction - AC 1/1/02 LA BR 6130736 LA BREA ST CLIFF DR COAST HY E AC 2 7 439 28 12,279 2/17/22 90 0 91 9 New Construction - AC 1/1/90 LEDRO 6130510 LEDROIT ST LEDROIT ST @WYE NE END E AC 2 7 38 60 2,296 4/7/22 90 0 89 11 New Construction - AC 1/1/82 SANTA 6180471 SANTA CRUZ ST CALLIOPE ST MOUNTAIN RD P AC 2 10 434 28 12,152 2/10/22 90 55 45 0 Surface Treatment - Slurry Seal 11/1/16 LEDRO L 6130509 LEDROIT LN SUNSET RIDGE DR END P AC 0 7 185 26 4,810 2/14/22 90 0 100 0 New Construction - AC 1/1/80 ST AN 6180147 ST ANNS DR BROWNCROFT RD PARK AV E AAC 2 3 838 36 30,183 2/17/22 90 0 96 4 Overlay - AC Structural 1/1/22 BEACH ST 6130267 BEACH ST LOWER CLIFF DR BROADWAY C AC 0 6 282 40 11,280 4/7/22 90 48 52 0 Surface Treatment - Slurry Seal 5/22/25 BERN C 6130170 BERN CT PARK AV END P AC 2 2 245 22 5,390 4/5/22 90 0 100 0 Surface Treatment - Slurry Seal 9/15/21 DUNNE 6130559 DUNNEGAN DR DARTMOOR ST WINDSOR PL E AC 2 7 731 26 19,006 2/11/22 90 0 41 59 New Construction - AC 1/1/84 EL CA 6180094 EL CAMINO DEL MAR LOS ROBLES SHORT ST E AAC 2 3 730 34 24,820 2/17/22 90 51 49 0 Overlay - AC Structural 1/1/22 MAR V 6370366 MAR VISTA AVE EAGLEROCK WY THIRD AV E AC 2 1 614 26 15,964 2/18/22 90 51 49 0 Surface Treatment - Slurry Seal 10/1/19 MCAUL 6370722 MCAULAY PL VICTORIA DR COAST HY E AC 2 8 454 28 12,714 4/29/22 90 0 24 76 Surface Treatment - Slurry Seal 11/1/16 MONTE 6370478 MONTEREY ST WEST ST BROOKS ST E AC 2 1 594 28 16,632 2/18/22 90 0 78 22 Surface Treatment - Slurry Seal 10/1/19 WOODL 6130138 WOODLAND DR LAGUNA CANYON RD VICTORIA WK E AC 2 13 741 38 28,158 4/4/22 90 29 66 5 New Construction - AC 1/1/03 ALTA VISTA 6370768 ALTA VISTA WAY KILO WY FONTANA WY C AC 2 8 432 20 6,251 2/15/22 90 0 100 0 Surface Treatment - Slurry Seal 11/1/16 LINDE 6130276 LINDEN ST HIGH DR NORTH END E AC 2 6 516 28 7,532 2/11/22 90 0 61 39 Surface Treatment - Slurry Seal 5/22/25 RADCL 6180701 RADCLIFF CT CATALINA ST N END E AC 1 10 110 22 2,420 2/11/22 90 0 68 32 Surface Treatment - Slurry Seal 11/1/16 AGATE ST 6180653 AGATE ST GLENNEYRE ST CATALINA ST E AC 2 10 714 30 10,493 2/10/22 90 0 65 35 Surface Treatment - Slurry Seal 11/1/20 LOMBA 6180112 LOMBARDY LN WILSON ST TEMPLE TE E AC 2 13 627 26 16,290 2/16/22 90 0 100 0 New Construction - AC 1/1/10 VISTA 6130024 VISTA LN WEST END SKYLINE DR E AC 2 12 240 20 4,790 4/7/22 90 29 51 20 Surface Treatment - Slurry Seal 11/1/17 WEYMO 6130504 WEYMOUTH PL HILLCREST DR EAST END E AC 2 7 844 24 20,255 2/11/22 90 0 65 35 New Construction - AC 1/1/90 BROOKS ST 6180514 BROOKS ST CATALINA ST TEMPLE TERR E AC 2 13 1,226 58 71,108 2/10/22 90 0 100 0 New Construction - AC 1/1/08 HAROL 6130282 HAROLD DR WEST END POPLAR ST E AC 2 6 729 34 24,779 2/11/22 90 0 100 0 Surface Treatment - Slurry Seal 5/22/25 NYES 6370621 NYES PL HIGHLAND RD BALBOA AV C AC 2 8 3,918 38 135,560 2/15/22 90 0 69 31 Surface Treatment - Slurry Seal 11/1/16 PEARL 6180641 PEARL ST OCEAN WY COAST HY E AC 2 10 260 34 8,840 4/7/22 90 38 57 5 Surface Treatment - Slurry Seal 11/1/16 PINEC 6130660 PINECREST DR HILLCREST DR END E AC 2 7 907 24 21,768 2/11/22 90 0 51 49 New Construction - AC 1/1/78 SANTA ANA 7000006 SANTA ANA ST DEL MAR AV CORTEZ AVE E AC 0 9 830 20 16,600 2/15/22 90 38 41 21 Surface Treatment - Slurry Seal 12/1/14 SUNSE 6130693 SUNSET AV SUNSET RIDGE DR @WYE SE END E AC 2 7 342 30 10,262 2/14/22 90 0 74 26 New Construction - AC 1/1/95 TEMPL 6180276 TEMPLE HILLS DR THALIA ST DUNNING DR C AC 2 8 1,332 24 31,961 4/6/22 90 27 67 6 New Construction - AC 1/1/92 THROU 6180104 THROUGH ST PARK AV LEGION ST E AAC 2 3 476 34 16,168 2/17/22 90 0 56 44 Overlay - AC Structural 1/1/22 ALTA LAGUN 6130196 ALTA LAGUNA BLVD CHILLON WY TEMPLE HILLS DR P AC 0 2 1,255 54 67,770 4/6/22 91 0 56 44 Surface Treatment - Slurry Seal 9/15/21 BERNARD CT 6130167 BERNARD CT ZELL DR END E AC 2 2 524 22 11,537 4/6/22 91 0 94 6 Surface Treatment - Slurry Seal 9/15/21 CORON 6130050 CORONADO DR SKYLINE DR END P AC 2 12 924 26 24,024 4/7/22 91 22 31 47 Surface Treatment - Slurry Seal 11/1/17 MONTE 6370537 MONTEREY ST BROOKS ST S BROOKS ST N E AC 1 1 1,744 38 66,273 2/18/22 91 0 66 34 Surface Treatment - Slurry Seal 10/1/19 GAINS 6180636 GAINSBOROUGH DR GAINSBOROUGH PL GAINSBOROUGH WY E AC 2 11A 186 32 5,948 4/29/22 91 0 43 57 Surface Treatment - Slurry Seal 11/1/20 HOLLY 6370490 HOLLY DR ALTA LOMA DR OCEAN VIEW ST E AC 2 1 667 32 21,356 2/18/22 91 0 56 44 Surface Treatment - Slurry Seal 10/1/19 LOMIT 6370697 LOMITA WY ALTA VISTA WY END E AC 2 8 459 20 9,189 4/8/22 91 29 49 22 Surface Treatment - Slurry Seal 11/1/16 MEADO 6180254 MEADOWLARK DR ORIOLE DR END E AC 2 11 720 24 17,280 2/16/22 91 0 100 0 Surface Treatment - Slurry Seal 11/1/17 VIACOR 6130716 VIA CORSICA MCKNIGHT SE END P AC 0 7 234 30 7,020 2/14/22 91 0 86 14 New Construction - AC 1/1/80 ALTA VISTA 6370696 ALTA VISTA WAY NIDO WY LOMITA WY C AC 2 8 646 20 12,924 4/8/22 91 0 78 22 Surface Treatment - Slurry Seal 11/1/16 BLUEBIRD C 6180220 BLUEBIRD CANYON DR EASTMAN WY KELLER WY C AC 2 11 622 32 7,642 2/16/22 91 56 44 0 Surface Treatment - Slurry Seal 11/1/16 CANYO 6130031 CANYON ACRES DR LEWIS LN EAST END E AC 2 13 2,580 30 46,170 4/4/22 91 25 44 31 New Construction - AC 1/1/85 CATAL 6180702 CATALINA ST MOSS ST OSGOOD CT E AC 2 10 510 38 19,380 2/10/22 91 0 67 33 Surface Treatment - Slurry Seal 11/1/16 CLIFF 6130744 CLIFF DR CIRCLE WY BEVERLY ST P AC 0 7 1,540 42 64,680 2/17/22 91 0 74 26 New Construction - AC 1/1/80 LOMBA 6180122 LOMBARDY LN ANITA ST WILSON ST E AC 2 13 579 28 16,210 2/16/22 91 0 65 35 New Construction - AC 1/1/10 CHILL 6130221 CHILLON WY ALTA LAGUNA BL CATEAU WY E AC 2 2 965 36 34,729 4/6/22 91 0 50 50 Surface Treatment - Slurry Seal 9/15/21 THIRD 6370316 THIRD AV MAR VISTA AV SE END E AC 2 1 306 28 8,558 4/8/22 91 25 42 33 Surface Treatment - Slurry Seal 10/1/19 BROOKS ST 6370531 BROOKS ST MONTEREY ST PEDRO ST E AC 2 1 491 28 13,740 2/18/22 91 0 72 28 Surface Treatment - Slurry Seal 10/1/19 SUNSE 6130676 SUNSET AV NW END LEDROIT LN E AC 2 7 158 26 4,117 2/14/22 91 0 100 0 New Construction - AC 1/1/81 GAINS PL 6180631 GAINSBOURGOUGH PL GAINSBOROUGH DR END P AC 2 11A 237 24 5,688 4/29/22 91 46 43 11 Surface Treatment - Slurry Seal 5/22/24 THIRD 6370371 THIRD AV SCENIC DR MAR VISTA AV E AC 2 1 230 40 9,207 2/18/22 91 0 100 0 Surface Treatment - Slurry Seal 10/1/19 ZURIC 6130166 ZURICH CT SW END ZELL DR E AC 2 2 261 22 5,748 4/6/22 91 0 100 0 Surface Treatment - Slurry Seal 9/15/21 BALBOA AV 6180318 BALBOA AV BARRACUDA WY CORTEZ AV C AC 2 9 502 36 14,764 2/15/22 91 0 100 0 Surface Treatment - Slurry Seal 12/1/14 FOURT 6370395 FOURTH AV COAST HY VIRGINIA WY C AC 2 1 200 38 7,602 2/18/22 91 0 100 0 Surface Treatment - Slurry Seal 10/1/19 CRESC 6130714 CRESCENT BAY DR CRESCENT BAY DR @E WYE EAST END E AC 2 7 182 22 4,015 2/15/22 91 0 100 0 New Construction - AC 1/1/80 MEADO LN 6180170 MEADOWLARK LN MEADOWLARK DR END P AC 2 11 532 32 18,224 2/16/22 91 0 100 0 Surface Treatment - Slurry Seal 11/1/17
46 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date MYRTL 6130300 MYRTLE ST MONTEREY DR HIGH DR E AC 2 6 643 36 23,149 2/11/22 91 0 47 53 Surface Treatment - Slurry Seal 5/22/25 NESTA 6130163 NESTALL RD MOUNTAIN VIEW DR END E AC 2 2 757 32 24,214 4/6/22 91 30 70 0 Surface Treatment - Slurry Seal 9/15/21 TEMPL 6130246 TEMPLE HILLS DR PALM DR SAN REMO DR C AC 2 2 989 30 29,662 4/6/22 91 29 66 5 Surface Treatment - Slurry Seal 9/15/21 WESLE 6370091 WESLEY DR MARILYN DR DRIFTWOOD DR E AC 2 1A 255 36 9,180 4/8/22 91 27 73 0 Surface Treatment - Slurry Seal 11/1/20 DEL M 6180544 DEL MAR AV END BAJA ST C AC 2 9 230 25 5,725 2/15/22 91 0 100 0 Surface Treatment - Slurry Seal 12/1/14 PARK 6130244 PARK AV TAHITI AV BERN DR S C AC 2 2 1,993 48 95,664 4/5/22 91 29 71 0 Surface Treatment - Slurry Seal 9/15/21 WINDS 6130501 WINDSOR PL NW END DUNNEGAN DR E AC 2 7 337 24 8,083 4/7/22 91 26 32 42 New Construction - AC 1/1/10 ALTA LAGUN 6130223 ALTA LAGUNA BLVD TEMPLE HILLS DR CHILLON WY P AC 2 2 610 38 23,180 4/6/22 91 0 93 7 Surface Treatment - Slurry Seal 9/15/21 BRIDGE DR 6130176 BRIDGE DR HILLVIEW DR END E AC 2 2 406 24 9,738 4/7/22 91 0 100 0 Surface Treatment - Slurry Seal 9/15/21 LOCUS 6130284 LOCUST ST CYPRESS DR MONTEREY DR E AC 2 6 625 36 22,500 2/11/22 91 39 61 0 Surface Treatment - Slurry Seal 5/22/25 OCEAN 6180621 OCEAN WY AGATE ST PEARL ST E AC 2 10 354 36 12,730 2/17/22 91 0 48 52 Surface Treatment - Slurry Seal 11/1/16 CARME 6180467 CARMELITA ST CALLIOPE ST CRESS ST E AC 2 10 673 28 18,844 2/10/22 92 0 63 37 Surface Treatment - Slurry Seal 11/1/16 MIRAM 6180344 MIRAMAR ST DEL MAR AV END (N) E AC 2 9 859 25 10,750 2/15/22 92 0 100 0 Surface Treatment - Slurry Seal 12/1/14 SKYLI 6130108 SKYLINE DR PARK AV MANZANITA DR C AC 2 12 249 26 6,478 4/7/22 92 38 62 0 Surface Treatment - Slurry Seal 11/1/17 TIA J 6180356 TIA JUANA ST CORTEZ AV CAPISTRANO AV E AC 2 9 430 20 8,600 2/15/22 92 0 52 48 Surface Treatment - Slurry Seal 12/1/14 ZELL 6130218 ZELL DR TEMPLE HILLS DR CATEAU WY E AC 2 2 1,560 32 49,920 4/6/22 92 0 66 34 Surface Treatment - Slurry Seal 9/15/21 AGATE ST 6180613 AGATE ST NE END CATALINA ST E AC 2 10 845 36 30,420 2/10/22 92 0 88 12 Surface Treatment - Slurry Seal 11/1/20 ALTA LAGUN 6130190 ALTA LAGUNA BLVD CRESTA WY PARK AV P AC 4 2 1,297 54 70,038 4/6/22 92 29 66 5 Surface Treatment - Slurry Seal 9/15/21 BLUEBIRD C 6180216 BLUEBIRD CANYON DR HALL PL REGATTA RD C AC 2 11 1,188 26 30,883 2/16/22 92 0 47 53 New Construction - AC 1/1/10 DEL M 6180331 DEL MAR AV LA MIRADA ST MIRAMAR ST C AC 2 9 230 25 5,750 2/15/22 92 0 87 13 Surface Treatment - Slurry Seal 12/1/14 MAR V 6370370 MAR VISTA AVE SUNSET AV THIRD AV E AC 2 1 674 26 17,519 2/18/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 OCEAN 6180646 OCEAN WY RUBY ST MOSS ST E AC 2 10 350 36 12,606 2/17/22 92 0 52 48 Surface Treatment - Slurry Seal 11/1/16 BOLSA 6370690 BOLSANA WAY END LORETTA DR E AC 2 9 549 20 12,230 4/29/22 92 0 15 85 New Construction - AC 1/1/09 CANYO 6130135 CANYON ACRES DR LAGUNA CANYON RD LEWELLYN DR E AC 2 13 953 38 36,214 4/4/22 92 34 47 19 New Construction - AC 1/1/93 LA MI 6180197 LA MIRADA ST ENSENADA AV N END E AC 2 9 874 25 20,163 2/16/22 92 0 75 25 Surface Treatment - Slurry Seal 12/1/14 REGAT 6180249 REGATTA RD BLUEBIRD CANYON DR MORNINGSIDE DR E AC 2 11 589 24 14,138 2/16/22 92 0 90 10 Surface Treatment - Slurry Seal 11/1/16 ALTA LAGUN 6130182 ALTA LAGUNA BLVD RIDGE DR END/TRAIL HEAD P AC 2 2 882 40 35,280 4/5/22 92 33 67 0 Surface Treatment - Slurry Seal 9/15/21 ALTA VISTA 6370560 ALTA VISTA WAY QUEDA WY PALA WY C AC 2 8 242 16 3,871 4/8/22 92 0 100 0 Surface Treatment - Slurry Seal 11/1/16 AVALON AV 6180030 AVALON AV ANITA ST SEAVIEW ST E AC 2 13 155 40 6,200 2/10/22 92 0 67 33 Surface Treatment - Slurry Seal 11/1/16 TYROL 6130209 TYROL DR MOUNTAIN VIEW DR RIDGE DR E AC 2 2 903 36 32,508 4/5/22 92 32 59 9 Surface Treatment - Slurry Seal 9/15/21 BROOKS ST 6370551 BROOKS ST BROOKS ST N PEDRO ST E AC 2 1 520 24 12,487 2/18/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 PASEO 6370474 PASEO DEL SUR RICO RD EAST END E AC 2 1 515 28 14,432 4/8/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 ST AN 6180140 ST ANNS DR WILSON ST BROWNCROFT RD E AAC 2 3 541 34 18,394 2/17/22 92 0 47 53 Overlay - AC Structural 1/1/22 TEMPL 6130251 TEMPLE HILLS DR BAYVIEW PL PALM DR C AC 2 2 1,091 36 39,276 4/6/22 92 33 67 0 Surface Treatment - Slurry Seal 9/15/21 WARDS 6370701 WARDS TE NW END DUMOND DR E AC 2 8 271 24 6,507 4/29/22 92 0 7 93 Surface Treatment - Slurry Seal 11/1/16 ALTA LAGUN 6130194 ALTA LAGUNA BLVD TEMPLE HILLS DR CRESTA WY P AC 4 2 728 54 39,312 4/6/22 92 32 68 0 Surface Treatment - Slurry Seal 9/15/21 BLUEBIRD C 6180505 BLUEBIRD CANYON DR CARMALITA ST SUMMIT DR C AC 2 10 680 38 15,450 2/10/22 92 0 42 58 Surface Treatment - Slurry Seal 11/1/20 CIRCL 6130763 CIRCLE WY CIRCLE WY @E WYE CLIFF DR E AC 1 7 77 38 2,907 2/15/22 92 0 45 55 New Construction - AC 1/1/82 NORIA 6180326 NORIA ST ENSENADA AV END E AC 2 9 1,023 26 27,534 2/15/22 92 0 41 59 Surface Treatment - Slurry Seal 12/1/14 OCEAN 6180652 OCEAN WY DIAMOND ST RUBY ST E AC 2 10 347 26 9,015 2/17/22 92 0 56 44 Surface Treatment - Slurry Seal 11/1/16 PALME 6180409 PALMER PL CATALINA ST END E AC 2 10 225 32 7,200 2/10/22 92 0 42 58 Surface Treatment - Slurry Seal 11/1/16 ARROYO DR 6130029 ARROYO DR CANYON ACRES DR NE END E AC 2 13 925 30 27,765 4/4/22 92 29 71 0 New Construction - AC 1/1/81 LINDE 6130335 LINDEN ST CYPRESS DR HIGH DR P AC 2 6 772 28 21,616 2/11/22 92 0 100 0 Surface Treatment - Slurry Seal 5/22/25 CAMDE 6130503 CAMDEN PL NW END DARTMOOR ST E AC 2 7 441 28 12,350 2/11/22 92 0 58 42 New Construction - AC 1/1/89 CRESS 6180453 CRESS ST CATALINA ST BRANGWYM WY C AC 2 13 771 40 30,840 2/10/22 92 0 69 31 New Construction - AC 1/1/05 FIFTH 6370379 FIFTH AV COAST HY VIRGINIA WY E AC 2 1 200 38 7,602 2/18/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 MYRTL 6130381 MYRTLE ST COAST HY CYPRESS DR E AC 2 6 330 34 11,220 2/11/22 92 0 43 57 Surface Treatment - Slurry Seal 5/22/25 MYRTL 6130382 MYRTLE ST CLIFF DR COAST HY E AC 2 7 340 30 10,197 4/5/22 92 37 63 0 New Construction - AC 1/1/94 OCEAN VIEW 6370610 OCEAN VIEW VISTA DR MARILYN DR END P AC 2 1A 360 31 11,160 4/8/22 92 26 74 0 Surface Treatment - Slurry Seal 11/1/20 RIMCR 6130173 RIMCREST CL RIDGE DR NW END E AC 2 2 349 28 9,772 4/5/22 92 0 93 7 Surface Treatment - Slurry Seal 9/15/21 DIAMO 6180619 DIAMOND ST S END SUMMIT DR C AC 2 11 1,022 20 20,447 2/16/22 92 0 85 15 Surface Treatment - Slurry Seal 11/1/17 OAK S 6180126 OAK ST CATALINA ST WILSON ST E AC 2 13 805 38 30,586 2/10/22 92 0 94 6 New Construction - AC 1/1/02 SUNSE 6370358 SUNSET AV MAR VISTA AV EIGHTH AV E AC 0 1 1,180 30 35,400 2/18/22 92 0 100 0 Surface Treatment - Slurry Seal 10/1/19 CEANO 6370475 CEANOTHUS DR ALTA LOMA DR NW END E AC 4 1 1,670 28 46,751 2/18/22 93 0 54 46 Surface Treatment - Slurry Seal 10/1/19 FAIRV 6130550 FAIRVIEW ST COAST HY HILLCREST DR E AC 2 7 620 30 18,600 2/14/22 93 0 94 6 New Construction - AC 1/1/87 GOFF 6180107 GOFF ST LOS OLIVOS END E AAC 2 3 387 28 10,848 4/6/22 93 33 61 6 Overlay - AC Structural 4/1/22 SCENI 6370393 SCENIC DR FIFTH AV FOURTH AV E AC 2 1 354 28 9,922 2/18/22 93 0 93 7 Surface Treatment - Slurry Seal 10/1/19 SEAVI 6180120 SEAVIEW ST CATALINA ST AVALON AV E AC 2 13 303 30 9,105 2/16/22 93 0 86 14 New Construction - AC 1/1/10 BLUEBIRD C 6180497 BLUEBIRD CANYON DR COAST HY CARMALITA ST C AC 2 10 1,026 38 31,000 2/10/22 93 0 77 23 Surface Treatment - Slurry Seal 11/1/16 NINTH 6370258 NINTH AV VIRGINIA WY LUPIN PL E AC 2 1 579 24 13,896 2/18/22 93 0 61 39 Surface Treatment - Slurry Seal 10/1/19 SANTA 6180694 SANTA CRUZ ST PEARL ST BLUEBIRD CANYON DR E AC 2 10 620 20 12,400 2/10/22 93 0 60 40 Surface Treatment - Slurry Seal 11/1/20 ZELL 6130195 ZELL DR TEMPLE HILLS DR ALTA LAGUNA BL E AC 2 2 683 38 25,973 4/6/22 93 0 83 17 Surface Treatment - Slurry Seal 9/15/21 CATAL 6370415 CATALINA ST MONTEREY ST WEST ST E AC 2 1 650 30 19,489 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 CHILL 6130226 CHILLON WY ZELL DR CATEAU WY E AC 2 2 543 36 19,534 4/6/22 93 0 100 0 Surface Treatment - Slurry Seal 9/15/21 FIFTH 6370381 FIFTH AV VIRGINIA WY SCENIC DR E AC 2 1 343 38 13,034 2/18/22 93 0 73 27 Surface Treatment - Slurry Seal 10/1/19 KENDA 6370734 KENDAL DR BALBOA AVE END E AC 2 9 628 28 21,546 2/18/22 93 0 90 10 Surface Treatment - Slurry Seal 12/1/14 REED 6180058 REED ST PARK AV LEGION ST E AAC 2 3 253 30 7,600 2/17/22 93 0 73 27 Overlay - AC Structural 1/1/22 SECON 6370403 SECOND AV VIRGINIA WY SCENIC DR E AC 2 1 900 24 21,600 2/18/22 93 0 79 21 Surface Treatment - Slurry Seal 10/1/19 ACAPULCO 6180364 ACAPULCO ST ALISOS AV CORTEZ AV E AC 2 9 362 20 7,248 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 ALTA VISTA 6370726 ALTA VISTA WAY IRIS WY ENCINA WY C AC 2 8 86 20 1,725 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 11/1/16 BAJA ST 6180574 BAJA ST SUMMIT DR S END P AC 2 9 227 30 6,810 2/16/22 93 0 100 0 New Construction - AC 1/1/80 CAPIS 6180549 CAPISTRANO AV LA MIRADA ST MIRAMAR ST E AC 2 9 230 25 5,750 2/15/22 93 37 63 0 Surface Treatment - Slurry Seal 12/1/14 DEL M 6180329 DEL MAR AV KATELLA ST LA MIRADA ST C AC 2 9 230 25 5,750 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14
47 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date DEL M 6180342 DEL MAR AV TIA JUANA ST BALBOA ST C AC 2 9 242 36 8,727 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 EL BO 6180151 EL BOSQUE CATALINA ST EL BOSQUE @WYE E AAC 2 3 796 34 27,064 2/17/22 93 0 100 0 Overlay - AC Structural 1/1/22 GULL 6370731 GULL CL DAVIS WY MARLIN DR E AC 2 9 266 25 7,448 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 HEATH 6130505 HEATHER PL HILLCREST DR EAST END E AC 2 7 553 24 13,263 2/11/22 93 0 85 15 New Construction - AC 1/1/90 JASMI 6130289 JASMINE ST CYPRESS DR MONTEREY DR E AC 2 6 625 38 23,750 2/11/22 93 0 90 10 Surface Treatment - Slurry Seal 5/22/25 LAVEN 6180164 LAVENDER LN MORNINGSIDE DR NE END E AC 2 11 172 36 6,210 2/16/22 93 0 70 30 Surface Treatment - Slurry Seal 11/1/16 MERMA 6130059 MERMAID ST THIRD ST LOMA TERR E AC 2 4 187 28 5,250 2/17/22 93 0 100 0 New Construction - AC 1/1/82 MOUNT 6180489 MOUNTAIN RD S END COAST HY E AC 2 10 190 36 6,840 2/16/22 93 0 100 0 Surface Treatment - Slurry Seal 11/1/16 MYSTI V 6130013 MYSTIC VIEW MYSTIC WY END P AC 0 12 1,144 26 29,744 4/8/22 93 0 62 38 Surface Treatment - Slurry Seal 11/1/17 RIDGE 6130242 RIDGE DR ALTA LAGUNA BLVD TYROL DR E AC 2 2 535 34 18,190 4/5/22 93 0 100 0 Surface Treatment - Slurry Seal 9/15/21 SECON ST 6130064 SECOND ST MERMAID ST FOREST AV P AC 2 4 481 42 20,202 2/17/22 93 15 62 23 New Construction - AC 1/1/80 SUNSE 6370357 SUNSET AV EIGHTH AV VIRGINIA WY E AC 2 1 1,220 26 31,720 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 THIRD 6370401 THIRD AV VIRGINIA WY SCENIC DR E AC 2 1 715 32 22,880 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 WAVE 6130555 WAVE ST COAST HY HILLCREST DR E AC 2 7 620 32 19,840 2/14/22 93 0 78 22 New Construction - AC 1/1/10 WILSO 6180124 WILSON ST OAK ST LOMBARDY LN E AC 2 13 209 22 4,608 2/16/22 93 0 100 0 New Construction - AC 1/1/10 ALTA VISTA 6370759 ALTA VISTA WAY CORONA WY BONITA WY C AC 2 8 176 20 3,518 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 11/1/16 CENTE 6180668 CENTER ST COAST HY CATALINA ST E AC 2 10 675 48 32,400 2/11/22 93 0 90 10 Surface Treatment - Slurry Seal 11/1/20 DARTM 6130536 DARTMOOR ST DUNNEGAN DR EAST END E AC 2 7 142 36 5,111 2/11/22 93 0 59 41 New Construction - AC 1/1/03 FAYET 6130514 FAYETTE PL PANORAMA DR EAST END E AC 2 7 227 26 5,913 2/14/22 93 0 100 0 New Construction - AC 1/1/84 FONTA 6370757 FONTANA WY CORONA WY BONITA WY E AC 2 8 121 30 3,643 2/15/22 93 0 59 41 Surface Treatment - Slurry Seal 11/1/16 PACIF 6130045 PACIFIC AV SKYLINE DR CORAL DR E AC 2 12 719 28 20,132 4/7/22 93 35 65 0 Surface Treatment - Slurry Seal 5/22/24 RUBY PL 6180700 RUBY PL RUBY ST PRIVATE DR P AC 0 10 175 31 5,425 2/11/22 93 0 59 41 Surface Treatment - Slurry Seal 11/1/16 SANTA 6180473 SANTA CRUZ ST BLUEBIRD CANYON DR END E AC 2 10 375 28 10,500 2/10/22 93 0 44 56 Surface Treatment - Slurry Seal 11/1/20 ALEXANDER 6370641 ALEXANDER RD ASHTON DR END E AC 2 8 485 18 8,730 4/7/22 93 39 51 10 Surface Treatment - Slurry Seal 11/1/16 QUIVE 6180350 QUIVERA ST CORTEZ AV CAPISTRANO AV E AC 1 9 430 20 9,458 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 EIGHT 6370257 EIGHTH AV VIRGINIA WY SUNSET AV E AC 2 1 840 22 18,480 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 MOUNT V 6130161 MOUNTAIN VIEW DR TEMPLE HILLS DR END P AC 2 2 581 34 19,754 4/6/22 93 36 64 0 Surface Treatment - Slurry Seal 9/15/21 PEDRO 6370552 PEDRO ST BROOKS ST SE BROOKS ST NW E AC 2 1 1,347 24 32,333 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 ST AN 6180009 ST ANNS DR COAST HY END E AC 2 3 327 36 11,790 2/10/22 93 0 93 7 New Construction - AC 1/1/00 TEMPL PL 6180186 TEMPLE PL TEMPLE TER END P AC 2 13 228 31 7,068 4/29/22 93 36 46 18 New Construction - AC 1/1/80 TENTH 6370261 TENTH AV VIRGINIA WY BRACKEN WY E AC 2 1 355 22 5,224 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 CORTE 6180361 CORTEZ AV QUIVERA ST ACAPULCO ST E AC 1 9 230 20 4,600 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 OCEAN V 6370535 OCEAN VIEW ST MONTEREY ST HOLLY DR P AC 2 1 480 24 11,520 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 10/1/19 QUEDA 6370699 QUEDA WY ALTA VISTA WY W END E AC 2 8 475 20 9,501 4/8/22 93 0 51 49 Surface Treatment - Slurry Seal 11/1/16 SANDP 6370685 SANDPIPER DR WEST END DAVIS WY E AC 2 9 157 21 3,445 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CATAL 6180463 CATALINA ST CALLIOPE ST BROOKS ST E AC 2 10 1,031 44 45,364 2/10/22 93 0 77 23 Surface Treatment - Slurry Seal 11/1/16 CORAL 6130037 CORAL DR PACIFIC AV END E AC 2 12 887 28 24,836 4/7/22 93 34 58 8 Surface Treatment - Slurry Seal 11/1/17 MARLI 6370733 MARLIN DR KENDAL DR GULL CL E AC 2 9 717 24 11,483 2/18/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BAJA ST 6180561 BAJA ST END (S) CAPISTRANO AV E AC 2 9 459 25 10,750 2/15/22 93 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BEACH ST 6130080 BEACH ST BROADWAY OCEAN AV E AC 4 4 271 48 13,029 4/7/22 93 0 100 0 New Construction - AC 1/1/06 CLIFF 6130340 CLIFF DR MYRTLE ST JASMINE ST P AC 2 7 697 48 33,456 2/17/22 93 0 100 0 New Construction - AC 1/1/80 TEMPL TER 6180410 TEMPLE TERR CRESS ST CALLIOPE ST E AC 2 10 399 31 12,369 2/10/22 93 0 87 13 Surface Treatment - Slurry Seal 11/1/16 CATEA 6130225 CATEAU WY ZELL DR CHILLON WY E AC 2 2 846 36 30,470 4/6/22 94 0 91 9 Surface Treatment - Slurry Seal 9/15/21 CRESS 6180448 CRESS ST COAST HY CATALINA ST C AC 2 13 569 40 22,760 2/10/22 94 0 100 0 New Construction - AC 1/1/94 DAVIS 6370683 DAVIS WY SOUTH END NORTH END E AC 2 9 410 20 11,480 2/18/22 94 0 92 8 Surface Treatment - Slurry Seal 12/1/14 GAVIO 6180424 GAVIOTA DR BROOKS ST OAK ST E AC 2 13 1,025 36 36,900 2/16/22 94 0 88 12 New Construction - AC 1/1/80 PEARL 6180642 PEARL ST COAST HY CATALINA ST E AC 2 10 714 38 27,132 2/10/22 94 0 83 17 Surface Treatment - Slurry Seal 11/1/20 SCENI 6370674 SCENIC DR SECOND AV EAGLEROCK WY E AC 2 1 252 22 5,544 2/18/22 94 0 83 17 Surface Treatment - Slurry Seal 10/1/19 VIRGI 6370380 VIRGINIA WY FIFTH AV THIRD AV E AC 2 1 600 20 12,000 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 ALTA VISTA 6370569 ALTA VISTA WAY SOLANA WY END P AC 0 8 64 25 1,600 4/29/22 94 0 60 40 Surface Treatment - Slurry Seal 11/1/16 CAJON 6130575 CAJON ST COAST HY HILLCREST DR E AC 2 7 620 34 21,080 2/14/22 94 0 100 0 New Construction - AC 1/1/95 MARIO 6370705 MARION WY NW END DUMOND DR E AC 2 8 139 28 3,903 4/29/22 94 0 75 25 Surface Treatment - Slurry Seal 11/1/16 PALA 6370698 PALA WY ALTA VISTA WY END E AC 1 8 221 14 3,094 4/8/22 94 0 88 12 Surface Treatment - Slurry Seal 11/1/16 QUIVE 6180362 QUIVERA ST ALISOS AV CORTEZ AV E AC 1 9 352 20 7,738 2/15/22 94 0 74 26 Surface Treatment - Slurry Seal 12/1/14 ALISOS AV 6370589 ALISOS AV QUIVERA ST END E AC 2 9 335 20 6,700 2/15/22 94 0 83 17 Surface Treatment - Slurry Seal 12/1/14 CALLIOPE S 6180482 CALLIOPE ST COAST HY CATALINA ST E AC 2 10 566 42 23,772 2/10/22 94 0 72 28 Surface Treatment - Slurry Seal 11/1/16 EAGLE RK 6370408 EAGLE ROCK WY VIRGINIA WY SCENIC DR E AC 2 1 1,070 24 25,680 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 OAK S 6180181 OAK ST TEMPLE TE EAST END E AC 2 13 567 28 15,875 4/29/22 94 0 28 72 New Construction - AC 1/1/86 OAK S 6180432 OAK ST GAVIOTA DR COAST HY E AC 2 13 147 38 5,605 2/16/22 94 0 69 31 New Construction - AC 1/1/82 PANOR 6130590 PANORAMA DR ELEANOR LN END E AC 2 7 341 36 12,276 2/14/22 94 0 87 13 New Construction - AC 1/1/82 TEMPL 6130197 TEMPLE HILLS DR ZELL DR MOUNTAIN VIEW DR C AC 2 2 803 40 32,120 4/6/22 94 0 100 0 Surface Treatment - Slurry Seal 9/15/21 ALTA VISTA 6370775 ALTA VISTA WAY DUARTE WY CORONA WY C AC 2 8 143 20 2,865 2/15/22 94 0 84 16 Surface Treatment - Slurry Seal 11/1/16 ASTER ST 6130375 ASTER ST MONTEREY DR HIGH DR E AC 2 6 740 36 26,652 2/11/22 94 0 100 0 Surface Treatment - Slurry Seal 5/22/25 AVALON AV 6180041 AVALON AV SEAVIEW ST THALIA ST E AC 2 13 205 34 6,968 2/16/22 94 0 80 20 New Construction - AC 1/1/10 AVALON AV 6180119 AVALON AV SEAVIEW ST SE SEAVIEW ST NW E AC 2 13 50 36 1,800 2/16/22 94 0 100 0 New Construction - AC 1/1/10 EAGLE RK 6370405 EAGLE ROCK WY COAST HY VIRGINIA WY E AC 2 1 200 32 6,400 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 ELEAN 6130513 ELEANOR LN NW END PANORAMA DR E AC 2 7 359 24 8,610 2/14/22 94 0 100 0 New Construction - AC 1/1/87 GRACE 6180150 GRACELAND DR CATALINA ST WILSON ST E AC 2 3 590 34 20,046 2/10/22 94 0 76 24 New Construction - AC 1/1/84 GRAND 6130474 GRANDVIEW ST END HILLCREST DR E AC 2 7 442 32 14,144 2/14/22 94 0 100 0 New Construction - AC 1/1/06 LA BR 6130565 LA BREA ST COAST HY HILLCREST DR E AC 2 7 620 28 17,360 2/14/22 94 0 100 0 New Construction - AC 1/1/08 RANDA 6180394 RANDALL WY SANTA CRUZ ST END E AC 2 10 339 28 9,499 2/10/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/16 SUMMI 6180715 SUMMIT DR REMBRANDT DR PEARL ST C AC 2 11 204 22 4,498 2/16/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/17 VIRGI 6370798 VIRGINIA WY FIFTH AV END E AC 2 1 185 18 3,330 4/29/22 94 44 56 0 Surface Treatment - Slurry Seal 10/1/19
48 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date WAVE 6130700 WAVE ST CLIFF DR COAST HY E AC 2 7 370 32 11,840 2/17/22 94 0 100 0 New Construction - AC 1/1/92 HILLV 6130243 HILLVIEW DR HILLVIEW DR @WYE PARK AV E AC 2 2 109 36 3,925 4/7/22 94 0 100 0 Surface Treatment - Slurry Seal 9/1/21 MAR V 6370321 MAR VISTA AVE SUNSET AV EAST END E AC 2 1 196 38 7,450 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 TEMPL 6130206 TEMPLE HILLS DR SAN REMO DR DORN CT C AC 2 2 1,992 34 67,745 4/6/22 94 0 95 5 Surface Treatment - Slurry Seal 9/15/21 HILLV 6130245 HILLVIEW DR HILLVIEW DR END E AC 2 2 605 36 21,780 4/7/22 94 40 56 4 Surface Treatment - Slurry Seal 9/1/21 MYSTI 6130054 MYSTIC WY SKYLINE DR VISTA LN E AC 2 12 1,375 24 33,000 4/8/22 94 0 40 60 Surface Treatment - Slurry Seal 11/1/17 BROOKS ST 6180429 BROOKS ST COAST HY CATALINA ST E AC 2 13 565 40 22,600 2/10/22 94 0 100 0 New Construction - AC 1/1/10 ALPINE WAY 6130160 ALPINE WAY MOUNTAIN VIEW DR CDS E AC 2 2 439 32 14,036 4/6/22 94 0 100 0 Surface Treatment - Slurry Seal 9/15/21 CALLIOPE S 6180470 CALLIOPE ST TEMPLE TERR END E AC 2 10 603 42 25,326 2/10/22 94 0 90 10 Surface Treatment - Slurry Seal 11/1/16 CARME 6180691 CARMELITA ST CENTER ST BLUEBIRD CANYON DR E AC 2 10 985 36 35,460 2/11/22 94 0 90 10 Surface Treatment - Slurry Seal 11/1/20 AGATE ST 6180416 AGATE ST COAST HWY OCEAN WY P AC 2 10 260 30 7,800 2/17/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/16 BOLSA 6370736 BOLSANA WAY LORETTA DR BALBOA AV E AC 2 9 870 32 27,840 4/29/22 94 0 72 28 New Construction - AC 1/1/09 CATAL 6180417 CATALINA ST BLUEBIRD CANYON DR PALMER PL E AC 2 10 225 28 6,307 2/10/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/16 GRIFF 6180004 GRIFFITH PL SOUTH END GRIFFITH WY E AAC 2 3 208 28 5,817 4/29/22 94 60 4 36 Overlay - AC Structural 1/1/22 OAK S 6180460 OAK ST COAST HY CATALINA ST E AC 2 13 566 38 21,508 2/10/22 94 0 100 0 New Construction - AC 1/1/90 TEMPL 6130203 TEMPLE HILLS DR DORN CT ZELL DR C AC 2 2 547 40 21,880 4/6/22 94 0 100 0 Surface Treatment - Slurry Seal 9/15/21 BEACH ST 6130082 BEACH ST OCEAN AV FOREST AV E AC 2 4 257 36 9,267 4/7/22 94 0 100 0 New Construction - AC 1/1/10 DIAMO 6180640 DIAMOND ST COAST HY OCEAN WY C AC 2 10 230 38 8,740 2/17/22 94 0 100 0 Surface Treatment - Slurry Seal 11/1/16 MONTE 6370406 MONTEREY ST EAGLEROCK WY WEST ST E AC 2 1 753 28 21,084 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 NINTH 6370252 NINTH AV COAST HY VIRGINIA WY E AC 2 1 200 24 4,800 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 TENTH 6370247 TENTH AV COAST HY VIRGINIA WY E AC 2 1 200 30 6,000 2/18/22 94 0 100 0 Surface Treatment - Slurry Seal 10/1/19 VIRGI 6370356 VIRGINIA WY SEVENTH AV NINTH AV E AC 2 1 653 22 14,366 2/18/22 94 0 90 10 Surface Treatment - Slurry Seal 10/1/19 ALTA VISTA 6370724 ALTA VISTA WAY ENCINA WY DUARTE WY C AC 2 8 136 20 2,720 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 CATEA 6130224 CATEAU WY ZELL DR ALTA LAGUNA BL E AC 2 2 457 36 16,463 4/6/22 95 0 100 0 Surface Treatment - Slurry Seal 9/15/21 DIAMO 6180637 DIAMOND ST COAST HY CATALINA ST C AC 2 10 712 38 27,056 2/11/22 95 0 90 10 Surface Treatment - Slurry Seal 11/1/20 THIRD 6370390 THIRD AV COAST HY VIRGINIA WY E AC 2 1 200 36 7,202 2/18/22 95 0 90 10 Surface Treatment - Slurry Seal 10/1/19 CORTE 6180363 CORTEZ AV ACAPULCO ST SANTA ANA ST E AC 1 9 230 20 4,600 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180539 CORTEZ AV KATELLA ST LA MIRADA ST E AC 2 9 230 28 6,440 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CRESTW 6130172 CRESTWOOD CL RIDGE DR END P AC 2 2 236 32 7,552 4/5/22 95 0 100 0 Surface Treatment - Slurry Seal 9/15/21 EL CA 6180053 EL CAMINO DEL MAR GLENNEYRE ST GOFF ST E AAC 2 3 341 34 11,594 2/17/22 95 0 100 0 Overlay - AC Structural 1/1/22 KILO 6370695 KILO WY ALTA VISTA WY END E AC 2 8 578 22 12,716 4/8/22 95 0 82 18 Surface Treatment - Slurry Seal 11/1/16 PEARL 6180656 PEARL ST CATALINA ST CENTER ST E AC 2 10 600 28 16,800 2/10/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 TEMPL 6130238 TEMPLE HILLS DR SAN REMO DR SW SAN REMO DR NE C AC 2 2 910 38 34,573 4/6/22 95 0 100 0 New Construction - AC 1/1/08 CATAL 6370417 CATALINA ST COAST HY MONTEREY ST E AC 2 1 165 34 5,616 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 IRIS 6370773 IRIS WY ALTA VISTA WY END E AC 2 8 405 22 9,000 4/8/22 95 0 69 31 Surface Treatment - Slurry Seal 11/1/16 SCENI 6370388 SCENIC DR FOURTH AV THIRD AV E AC 2 1 356 28 9,968 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 ACAPULCO 6180352 ACAPULCO ST CORTEZ AV CAPISTRANO AV E AC 2 9 430 20 8,600 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BONITA WY 6370711 BONITA WY END (W) END (E) E AC 2 8 305 25 8,550 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 BROOKS ST 6180431 BROOKS ST COAST HY OCEAN FRONT E AC 2 13 264 40 10,560 2/16/22 95 0 100 0 New Construction - AC 1/1/10 CAPIS 6180349 CAPISTRANO AV QUIVERA ST ACAPULCO ST E AC 1 9 230 20 5,980 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180353 CAPISTRANO AV SANTA ANA ST TIA JUANA ST E AC 1 9 230 20 5,980 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180355 CAPISTRANO AV TIA JUANA ST BALBOA AV E AC 1 9 247 20 6,420 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CAPIS 6180551 CAPISTRANO AV KATELLA ST LA MIRADA ST E AC 2 9 230 25 5,750 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CHIQU 6130570 CHIQUITA ST COAST HY HEATHER PL E AC 2 7 620 34 21,080 2/14/22 95 0 100 0 New Construction - AC 1/1/82 CORON WY 6370781 CORONA WY FONTANA WY END P AC 0 8 276 30 8,280 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 CORTE 6180365 CORTEZ AV SANTA ANA ST TIA JUANA ST E AC 1 9 230 20 4,600 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180367 CORTEZ AV TIA JUANA ST BALBOA AV E AC 1 9 251 20 5,017 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CORTE 6180541 CORTEZ AV LA MIRADA ST MIRAMAR ST E AC 2 9 230 22 5,060 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 CRESS 6180494 CRESS ST COAST HY END C AC 2 13 209 42 8,778 2/16/22 95 0 100 0 New Construction - AC 1/1/85 CUMMINGS P 6180138 CUMMINGS PL SEAVIEW ST ANITA ST P AC 2 13 155 30 4,650 2/16/22 95 0 100 0 New Construction - AC 1/1/80 EAGAN 6370412 EAGAN RD FIRST AV WEST ST E AC 2 1 224 28 6,269 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 EIGHT 6370256 EIGHTH AV COAST HY VIRGINIA WY E AC 2 1 198 18 3,564 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 FAIRV 6130738 FAIRVIEW ST CLIFF DR COAST HY E AC 2 7 370 28 10,360 2/17/22 95 0 100 0 New Construction - AC 1/1/99 FIFTH 6370319 FIFTH AV SCENIC DR EAST END E AC 2 1 150 30 4,509 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 FLAMI 6180174 FLAMINGO RD ORIOLE DR END E AC 2 11 755 28 21,144 2/16/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/17 FLORA 6180664 FLORA ST GLENNEYRE ST CATALINA ST E AC 2 10 350 30 10,500 2/10/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 FLORA 6180684 FLORA ST CATALINA ST CARMELITA ST E AC 2 10 350 30 10,500 2/10/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 FLORA 6180689 FLORA ST CARMELITA ST SANTA CRUZ ST E AC 2 10 350 34 11,900 2/10/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 FONTA 6370563 FONTANA WY DUARTE WY CORONA WY E AC 2 8 125 30 3,762 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 FOURT 6370399 FOURTH AV VIRGINIA WY SCENIC DR C AC 2 1 529 28 14,812 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 GAVIO 6180492 GAVIOTA DR CRESS ST MOUNTAIN RD E AC 1 10 360 18 6,480 2/16/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 GAVIO 6180510 GAVIOTA DR CRESS ST BROOKS ST E AC 1 13 407 20 8,140 2/16/22 95 0 100 0 New Construction - AC 1/1/84 HILL 6130315 HILL LN ACACIA DR HIGH DR E AC 2 6 455 38 17,290 2/11/22 95 0 100 0 Surface Treatment - Slurry Seal 5/22/25 KATEL 6180316 KATELLA ST SUMMIT DR N END P AC 2 9 302 30 9,060 2/16/22 95 0 100 0 New Construction - AC 1/1/80 LOS O 6180055 LOS OLIVOS GLENNEYRE ST CATALINA ST E AAC 2 3 287 38 10,906 2/17/22 95 0 100 0 Overlay - AC Structural 1/1/22 MOSS 6370756 MOSS ST OCEAN WY COAST HY E AC 2 10 231 36 8,308 2/17/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 MOUNT V 6130199 MOUNTAIN VIEW DR TEMPLE HILLS DR TYROL DR P AC 0 2 1,648 34 56,032 4/6/22 95 0 100 0 Surface Treatment - Slurry Seal 9/15/21 MYRTL 6130364 MYRTLE ST CYPRESS DR MONTEREY DR E AC 2 6 625 36 22,500 2/11/22 95 0 100 0 Surface Treatment - Slurry Seal 5/22/25 ROSE 6130301 ROSE PL HIGH DR HAWTHORNE RD E AC 2 6 164 26 4,276 2/14/22 95 0 100 0 Surface Treatment - Slurry Seal 5/22/25 RUBY 6180650 RUBY ST OCEAN WY COAST HWY E AC 2 10 230 36 8,282 2/17/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 RUBY 6180651 RUBY ST COAST HY GLENNEYRE ST E AC 2 10 305 36 10,980 2/11/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/20 SANTA ANA 7000007 SANTA ANA ST CORTEZ AVE END E AC 0 9 180 20 3,600 2/15/22 95 0 100 0 Surface Treatment - Slurry Seal 12/1/14 SCENI 6370382 SCENIC DR THIRD AV SECOND AV E AC 2 1 349 28 9,772 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19
49 City of Laguna Beach, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
BranchID Sec ID Name From To Rank Surface Type Lanes Zone L W Area Insp. Date PCI % Load % Climate % Other Work History Type Work Date VIEJO 6130507 VIEJO ST HILLCREST DR NE END E AC 2 7 219 22 4,812 2/14/22 95 0 100 0 New Construction - AC 1/1/95 WEST 6370433 WEST ST COAST HY MONTEREY ST E AC 2 1 165 34 5,610 2/18/22 95 0 100 0 Surface Treatment - Slurry Seal 10/1/19 ALTA LAGUN 6130211 ALTA LAGUNA BLVD PARK AV RIDGE DR P AC 4 2 451 54 24,354 4/5/22 95 0 93 7 Surface Treatment - Slurry Seal 9/15/21 PACIF 6130009 PACIFIC AV CORAL DR END E AC 2 12 343 28 9,660 4/7/22 95 0 63 37 Surface Treatment - Slurry Seal 5/22/24 CRESTA 6130193 CRESTA WY TEMPLE HILLS DR ALTA LAGUNA BLVD P AC 2 2 922 34 31,348 4/6/22 95 0 100 0 Surface Treatment - Slurry Seal 9/15/21 SAN C 6370686 SAN CLEMENTE ST ALTA VISTA WY END E AC 2 8 359 18 4,626 4/8/22 95 0 100 0 Surface Treatment - Slurry Seal 11/1/16 DUMON 6370637 DUMOND DR WARDS TE MARION WY E AC 2 8 202 34 6,873 4/29/22 96 0 34 66 Surface Treatment - Slurry Seal 11/1/16 TYROL 6130191 TYROL DR ALTA LAGUNA BL MOUNTAIN VIEW DR E AC 2 2 265 36 9,522 4/5/22 96 0 100 0 Surface Treatment - Slurry Seal 9/15/21 BONN DR 6130208 BONN DR MOUNTAIN VIEW DR TYROL DR E AC 2 2 1,108 40 44,314 4/5/22 96 0 100 0 Surface Treatment - Slurry Seal 9/15/21 CRESC 6130731 CRESCENT BAY DR CRESCENT BAY DR @S WYE CRESCENT BAY DR @E WYE E AC 2 7 339 30 10,156 2/14/22 96 0 100 0 New Construction - AC 1/1/90 MOUNT V 6130164 MOUNTAIN VIEW DR TYROL DR END P AC 2 2 292 34 11,178 4/5/22 96 0 70 30 Surface Treatment - Slurry Seal 9/15/21 PITCA 6130007 PITCAIRN PL PACIFIC AV NORTH END E AC 2 12 98 28 2,754 4/7/22 96 0 100 0 Surface Treatment - Slurry Seal 11/1/17 VIA M 6130699 VIA MAJORCA MCKNIGHT DR SE END E AC 2 7 172 36 6,198 2/14/22 96 0 100 0 New Construction - AC 1/1/85 BOUNTY WY 6130001 BOUNTY WY PACIFIC AV EAST END E AC 2 12 466 24 11,192 4/7/22 96 60 23 17 Surface Treatment - Slurry Seal 11/1/17 MORNI CIR 6180217 MORNINGSIDE CIR MORNINGSIDE DR END P AC 2 11 79 31 2,449 2/16/22 96 0 38 62 Surface Treatment - Slurry Seal 11/1/16 MOSS 6370751 MOSS ST CATALINA ST SOUTH END E AC 2 10 620 28 17,360 2/11/22 96 0 100 0 Surface Treatment - Slurry Seal 11/1/20 DUART 6370778 DUARTE WY FONTANA WY E END E AC 2 8 102 20 2,040 4/8/22 97 0 100 0 Surface Treatment - Slurry Seal 11/1/16 BERMUDA DR 6130011 BERMUDA DR CORONADO DR NORTH END E AC 2 12 445 24 10,682 4/7/22 97 0 85 15 Surface Treatment - Slurry Seal 11/1/17 QUEDA 6370713 QUEDA WY ALTA VISTA WY E END E AC 2 8 263 26 6,846 4/8/22 97 0 68 32 Surface Treatment - Slurry Seal 11/1/16 DORN 6130162 DORN CT TEMPLE HILLS DR END E AC 2 2 96 40 3,826 4/6/22 98 0 100 0 Surface Treatment - Slurry Seal 9/15/21 DUART 6370776 DUARTE WY W END FONTANA WY E AC 2 8 308 26 7,999 4/8/22 98 0 52 48 Surface Treatment - Slurry Seal 11/1/16 BOUNTY WY 6130006 BOUNTY WY PACIFIC AV NW END E AC 2 12 240 24 5,750 4/7/22 98 0 51 49 Surface Treatment - Slurry Seal 11/1/17 TYROL 6130174 TYROL DR RIDGE DR NW END E AC 2 2 129 36 4,644 4/5/22 98 0 100 0 Surface Treatment - Slurry Seal 9/15/21 CORAL 6130018 CORAL DR PACIFIC AV NW END E AC 2 12 367 24 8,811 4/7/22 98 0 45 55 Surface Treatment - Slurry Seal 11/1/17 PARK P 6130165 PARK PL ALTA LAGUNA BLVD END P AC 2 2 426 36 15,336 4/5/22 98 0 100 0 Surface Treatment - Slurry Seal 9/15/21 CAPIS 6180538 CAPISTRANO AV MIRAMAR ST NORIA ST E AC 2 9 230 25 5,750 2/15/22 99 0 100 0 Surface Treatment - Slurry Seal 12/1/14 WILSO 6180035 WILSON ST SEAVIEW ST THALIA ST E AC 2 13 255 40 10,186 2/10/22 99 0 21 79 New Construction - AC 1/1/10 PASEO 6370534 PASEO DEL SUR TOTO LOMA LN RICO RD E AC 2 1 831 28 23,261 4/8/22 99 0 100 0 Surface Treatment - Slurry Seal 10/1/19 ARROYO CHI 6180001 ARROYO CHICO CATALINA ST END P AAC 2 3 428 20 8,560 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 BENT ST 6130104 BENT ST PARK AV END E AAC 2 4 385 46 17,710 4/13/22 100 0 0 0 Overlay - AC Structural 4/13/22 CATAL 6180042 CATALINA ST THALIA ST CLEO ST E AAC 2 3 860 50 43,000 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 CATAL 6180045 CATALINA ST LEGION ST PARK AV E AAC 2 3 586 36 21,106 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 CATAL 6180064 CATALINA ST CLEO ST LEGION ST P AAC 0 3 904 50 45,200 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 CLEO 6180081 CLEO ST SLEEPY HOLLOW LN COAST HY E AAC 2 3 277 52 14,404 5/22/22 100 0 0 0 Overlay - AC Structural 5/22/22 CLEO 6180136 CLEO ST GLENNEYRE ST CATALINA ST E AAC 2 3 342 28 9,571 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 CUPRI 6180016 CUPRIEN WY THALIA ST WENDT TERR E AAC 2 3 635 28 17,780 4/1/22 100 0 0 0 Overlay - AC Structural 4/1/22 DUNNI 6180175 DUNNING DR TEMPLE HILLS DR NE END E AC 2 8 1,898 22 41,750 4/6/22 100 0 0 0 Surface Treatment - Slurry Seal 12/1/14 DYER 6180239 DYER WY DYER WY MILLER WY E AC 2 11 611 12 7,332 2/16/22 100 0 0 0 Surface Treatment - Slurry Seal 11/1/16 DYER 6180262 DYER WY DYER PL MADISON PL E AC 0 11 175 14 2,445 2/16/22 100 0 0 0 Surface Treatment - Slurry Seal 11/1/16
50 City of Laguna Beach, CA Page 14
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
XIII. APPENDIX C – GIS DIGITAL DATA
Introduction
The OCTA GIS Section maintains a spatial inventory of transportation infrastructure which mostly consists of major arterial streets, roads, and highways. A key component of road information is pavement condition. Maintaining an inventory of pavement condition will enhance OCTA’s GIS visualization and analysis capabilities and assist in understanding the transportation investment needs throughout the region. Therefore, a GIS dataset in digital format should be included in this report.
Structure of GIS Data
The GIS dataset must consist of linear geographic features that represent road/street segments. All segments that are part of the report should be included in the GIS dataset. The attribute information of each segment should generally follow the format of the Complete Listing of Current Street Conditions in Appendix B above.
The GIS data requirements are discussed below. Most commercial and open-source GIS software provide industrystandard tools to manage GIS data to meet these requirements.
GIS Digital Data Format
The GIS data must be submitted in either one of the following formats:
• Esri Shapefile, or
• Esri File Geodatabase
Metadata
The GIS data are required to have associated metadata. The minimum metadata items required are:
• Title of Dataset
• Tags (A set of words that can be used by GIS to search for the resource. For example: “pavement”, “transportation”, “roads”)
• Summary (A brief purpose statement of the dataset)
• Description (A brief narrative of the dataset’s content) • Credits (A recognition of those who created or contributed to the resource) Spatial Geometry Type
The spatial geometry of the segment features must be lines that represent the roadway centerline as accurately as possible.
Projection
The GIS data must have spatial reference information and have its coordinate system identified and embedded in or associated with the data file(s). All GIS data submitted to OCTA should be in the following projected coordinate system:
51 City of Laguna Beach, CA Page 15
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
• NAD 1983 State Plane California VI FIPS 0406 (US Feet) - More information about this system can be found at: https://spatialreference.org/ref/epsg/nad83-california-zone-6-ftus/ GIS Feature Attributes
The required segment attributes are:
• Street name
• Unique segment identifier (Segment ID from original source if available) • Name of intersecting road at the beginning of a segment • Name of intersecting road at the end of the segment
• Current pavement condition index (PCI)
• Current PCI inspection date
• Length of road segment in feet
• Width of road segment in feet
• Paved area of road segment in square feet or square yards • Projected PCI at end of Seven-Year Road Maintenance and Rehabilitation Plan Additional attributes such as number of through travel lanes, direction of travel and pavement surface type may be provided.
52 City of Laguna Beach, CA Page 16
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
XIV. APPENDIX D – QUALITY ASSURANCE / QUALITY CONTROL PLAN Introduction
When performing data collection in any field, the need for quality control is paramount as it is essential for accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a pavement management program.
The Quality Assurance / Quality Control (QA/QC) Plan establishes minimum quality standards for performance and procedures for update of the pavement management program.
Objectives
This document constitutes a formal QA/QC Plan for the City of Laguna Beach. It was prepared in March, 2020 and last revised in April, 2026.
Specifically, it is intended for the 2026 Pavement Management Plan Update. The focus is on the collection of network-level pavement distress data (defined by National Cooperative Highway Research Program (NCHRP) Synthesis 401 Quality Management of Pavement Data Collection, as “Network-level data collection involves collection of large quantities of pavement condition data, which is often converted to individual condition indices or aggregated into composite condition indices”.
This document also addresses the QA/QC plan requirements of the Orange County Transportation Authority (OCTA)’s “Countywide Pavement Management Plan Guidelines” (Section 2.4), adopted in May 2010.
Structure of QA/QC Plan
The following components are addressed in this QA/QC Plan:
• Condition survey procedures used;
• Accuracy required for data collection;
• Inspector qualifications and experience; and
• Safety.
53 City of Laguna Beach, CA Page 17
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
Condition Survey Procedures
The governing document in performing condition surveys for the City of Laguna Beach is ASTM D6433 “Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys.” Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol. The following distresses are collected for each pavement type:
As required by the Orange County Transportation Authority (OCTA), the City of Laguna Beach must prepare and implement a quality assurance / quality control (QA/QC) plan regarding pavement management inspection as they pertain to MicroPAVER. For the purposes of this report, Bucknam has demonstrated below how our project team implemented QA/QC procedures during the project.
Our QA/QC plan focuses on the how each pavement inspection is performed, what distresses are collected and ensures that it complies with the OCTA guidelines defined within the “Countywide Pavement Management Plan Guidelines (CPMPG)”.
As shown within the OCTA CPMPG, our staff followed and delivered on the requirements stated within Chapter 2, page 2-5 which require specific QA/QC data (Items A through G). Additionally, Chapter 3 requires numerous data/deliverables from local agencies for OC Go eligibility. All general PCI budgetary report submittals will follow the Chapter 3 guidelines.
In conjunction with the outlined items within the CPMPG Section 2 we have summarized our QA/QC procedures below:
54 City of Laguna Beach, CA Page 18
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
a. Descriptions of condition survey - Our staff follows the required Condition Survey Protocols (CPMPG, Chapter 2); our staff assesses each pavement section for the minimum distresses outlined within Chapter 2, page 2-1. Additionally, based on the pavement conditions found, we collect all MicroPAVER/StreetSaver Army Corps of Engineers (USACE) distresses, if found within the sample sections; for example, if slippage cracking, potholes, etc. are found our survey technicians record the proper information.
b. How data was collected - Our surveys follow the OCTA accepted walking requirements. All sections that our staff surveys are performed through the walking method, approximately 10% of all sections surveyed were complemented with windshield surveys based on unique conditions found. Our staff physically measures the width of every section as well as measure for any square footage adjustment that need to be added or taken away from a sections “true area” (i.e. cul-desac, bus pads, street width variances, etc.). Samples taken always include a minimum of 2,500 SF coverage unless specific section limits prohibit this. Arterial section samples utilize a 3,500 SF sample size due to the larger section area (this is within the ASTM D6433 sample size calculation.
Field crews typically include one individual for residential pavement sections while Arterial (MPAH) routes utilize a two-person crew for safety, traffic control and increases quality control. c. Accuracy required for data collection - We use a statistical sampling approach for measuring the quality of our field technician’s work. In this manner, 10 percent of the original surveys are resurveyed by a different survey crew than the original, supervised by a field supervisor, and the results are compared to the original surveys. Our QC process involves checking the field crews’ work in a “blind study” fashion. Quality control checks are performed at the end of each survey week. This ensures that all field personnel are properly collecting section samples, distress types and distress severities for all street segments.
When QA/QC issues are found, our staff documents the issues within MicroPAVER’s user interface. If distress types found are not within the 97% accuracy our QA/QC is expanded beyond our minimum 10% resurvey to 20% of the original survey d. Random and Systematic Re-Inspections – As described above our staff re-inspects, as a minimum, 10% of the original survey (OCTA only requires 5%). Per the agencies requests, our staff will submit PCI reports to the agency as project status reports for their review. Agencies will typically review specific pavement sections for PCI accuracy based on recent overlay or slurry seal maintenance; this serves as an initial accuracy check on our surveys (outside Bucknam QC efforts).
Additionally, our staff performs “ride-a-long” surveys with local agency staff to build consensus on how our MicroPAVER/StreetSaver USACE surveys are performed, recorded and reported on.
Random re-inspections will include a representative selection across the following categories:
• Functional classed (i.e. MPAH, locals);
• Surface types (e.g. AC or PCC);
• Pavement conditions (e.g. good, fair, poor);
• Inspectors;
• Geographical areas, if applicable.
55 City of Laguna Beach, CA Page 19
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
For systematic re-inspections, this could be due to noticed trends such as specific treatment types (e.g. open-graded mixed), a specific inspector or geographical area. In these cases Bucknam continues to utilize a 10% re-inspection policy.
e. PCI Comparison with Past Surveys - if previous inspection data is available, new PCI’s calculated through the most recent inspections will be compared to previous PCI’s. If the variance in PCI is greater than +/- 10 PCI points, these sections will be flagged for further investigation and/or reinspection (In the cases that a PCI increases or decreases by 10 points follows the established CPMPG guidelines; Appendix A, page A-18).
f. Schedule of data submittal – Pending on the City’s last major PMP submittal, Bucknam will assist the agency in submitting the following:
Master Plan of Arterial Highways (MPAH) routes will be surveyed and reported on at least once every two years
Local streets will be surveyed and reported on every six years Corresponding MPAH and local PCI reporting and budgetary reporting will be submitted every two years
g. Inspector’s Qualifications and Experience – Bucknam staff have been trained on the use of MicroPAVER and the segment calibration/verification and inspection practices. Mr. Peter Bucknam (Project Manager) has completed the MicroPAVER Certification of Professional Development courses. All Bucknam field technicians are trained using the ASTM D6433 survey methodologies and have passed OCTA’s prequalification testing every year since 2010. Bucknam Infrastructure Group inspectors have attended formal training on pavement condition distress surveys. This training was conducted prior to performing any work using the ASTM D6433 protocols, consistent with OCTA’s requirements.
Attachments – Inspectors Certifications
• Certificate of Prequalification – OCTA Pavement Inspector Prequalification Program (see below):
56 City of Laguna Beach, CA Page 20
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
h. Safety procedures – Bucknam field survey techniques utilize the following procedures:
• All vehicles are properly marked or flagged with appropriate sign markings indicating that a “PAVEMENT SURVEY IS IN PROGRESS”
• All vehicles have the proper flashing amber light beacons placed on the top of the vehicle to allow for proper visibility and line-of-site warning • Large MPAH routes are surveyed using two field technicians to increase traffic control warning and safety
• While parking or stopping along the survey route, vehicles legally park within the right-ofway or use a parking lot • All field technicians wear ANSI – 105 Class II safety vests 57 City of Laguna Beach, CA Page 21
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
XV. APPENDIX E – PAVEMENT MANAGEMENT DATA FILES
The City of Laguna Beach MicroPAVER database (.e70 file) has been enclosed for City and OCTA use. This data and the associated reporting data includes:
• Street names and limits for the City’s public streets • Street identifiers (Branch ID, Section ID)
• Direction (if applicable)
• Beginning and ending of each section
• Length, width and true areas
• Functional Classification (MPAH, Local)
• Number of travel lanes
• Pavement Condition Index (PCI) and date of inspection • Type of recommended treatment
• Cost of recommended treatment
• Street geometry as linear of polygon features
58 City of Laguna Beach, CA Page 22
2026 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2026
XVI. APPENDIX F – GIS MAPS / CURRENT CONDITIONS
59