Attachment 4
62 63

Page 2 ends

LOCAL SIGNAL SYNCHRONIZATION PLAN
64

Page 3 ends

SECTION ONE

TRAFFIC SIGNAL SYNCHRONIZATION

GOALS, POLICIES, AND OBJECTIVES
65

Page 4 ends

GOALS
OCTA’s Regional Traffic Signal Synchronization Program (Regional Master Plan) is included as part of the approved Measure M2. The Regional Master Plan is a multi-agency, corridor-based approach that optimizes the performance of traffic signals based on existing traffic patterns. The goals of the program are to improve the flow of traffic on Orange County streets and roads by implementing multiagency signal synchronization.

The City of Laguna Beach is in concurrence with these goals and will continue to work cooperatively with OCTA and adjacent jurisdictions to synchronize signals throughout the City on a corridor basis.

This cooperation will serve to provide safe, efficient traffic circulation for our local needs as well as future demands, by continuing to improve travel times and reducing stops.

The City does not have a designated Traffic Management Center (TMC) or is responsible for any traffic signals within our city’s jurisdiction. However, the City is committed to collaborating with our local partners, mainly the City of Aliso Viejo and Caltrans, to improve traffic flow through arterial roadways within our city, specifically Pacific Coast Highway (also known as SR-1), Laguna Canyon Road/Broadway (also known as SR-133) and El Toro Road.

POLICIES
The City of Laguna Beach does not maintain or own our traffic signals in the City. However, this LSSP will be the basis of future ongoing efforts from the City to continue to maintain consistency with the Measure M2 funding. The purpose of the LSSP is to identify, implement and maintain coordination of traffic signals along corridors within our city and beyond its borders to regionally maintain safe and efficient flow of vehicular traffic.

The Regional Master Plan also provides the opportunity to work with neighboring agencies to accomplish mutually beneficial goals. It is the City’s desire and policy to continue participating in and supporting the Regional Master Plan. The City does not maintain local control and responsibility of all traffic signals within our jurisdiction; however, we are committed to collaborating with our local partners to coordinate any changes to the signals, equipment, and policies within our jurisdiction.

OBJECTIVES
The City of Laguna Beach plans to collaborate with our local partners to periodically evaluate and optimize signal timing in response to changing traffic conditions, volumes, and patterns. The City concurs that the Regional Master Plan is beneficial and needed to effectively move people and goods locally and regionally through efficient signal timing. By participating in the Regional Master Plan, the City recognizes the benefits gained from local signal timing and synchronization, as well as from eligible traffic signal and equipment upgrades. Moreover, the City recognizes this program as a valuable, corridor-based measure for improving air quality by reducing green-house gas emissions. In participating in the Regional Master Plan, it is the City’s objective to continue to address regional goals while serving constituents in a reasonable manner. 66

Page 5 ends

SECTION TWO

TRAFFIC SIGNAL SYNCHRONIZATION STREET ROUTES
(EXISTING AND PLANNED)
67

Page 6 ends

TRAFFIC SIGNAL SYNCHRONIZATION STREET ROUTES
EXISTING:

Regional Network:

Priority Corridor Network
1) Pacific Coast Highway (SR-1)
2) Laguna Canyon Road / Broadway Street (SR-133)
3) El Toro Road
PLANNED:

Regional Signal Synchronization Network
4) Pacific Coast Highway (SR-1) – School/State Park to Doheny Park Road 5) Laguna Canyon Road / Broadway Street (SR-133) – SR-1 to SR-73 6) El Toro Road – SR-133 to Bells Vireo Lane / Artisan Drive 68

Page 7 ends

SECTION THREE

TRAFFIC SIGNAL INVENTORY
69

Page 8 ends

Traffic Synchronization Inventory
City of Laguna Beach
Cycle Length Equipment
Corridor Cross Street Intersection AM MID PM WKND
Maintenance
Responsibility Cabinet Type Software Detection
Bike
Detection CCTV
Power
Backup Comm
Other
ITS ATMS Status
El Toro Road Bells Vireo Lane/Artisan Drive 120 Free 140 Free Aliso Viejo P (TS1) ASC/3 ASC/3 Loops No N/A BBS Copper Centracs Online NB SR-73 Off/On Ramp N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline SB SR-73 Off/On Ramp N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Pacific Coast Highway (SR-1) School/State Park N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Viejo Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Cliff Drive N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Beverly Street/Cliff Drive N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Boat Canyon Drive N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Myrtle Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Jasmine Street (RRFB Location) N/A N/A N/A N/A Caltrans Other Other Other Other No N/A N/A Other Other Offline Aster Street/Cliff Drive N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Broadway Street (Laguna Canyon Road/SR-133) N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Ocean Avenue N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Forest Avenue/Park Avenue N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Laguna Avenue N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Legion Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Cleo Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Thalia Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Anita Street (RRFB Location) N/A N/A N/A N/A Caltrans Other Other Other Other No N/A N/A Other Other Offline 70

Page 9 ends

Pacific Coast Highway (SR-1) Oak Street (RRFB Location) N/A N/A N/A N/A Caltrans Other Other Other Other No N/A N/A Other Other Offline Brooks Street (RRFB Location) N/A N/A N/A N/A Caltrans Other Other Other Other No N/A N/A Other Other Offline Cress Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Mountain Road N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Calliope Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Bluebird Canyon Drive N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Pearl Street (RRFB Location) N/A N/A N/A N/A Caltrans Other Other Other Other No N/A N/A Other Other Offline Diamond Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Nyes Place N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Montage Resort Drive N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Wesley Drive/Montage Resort Drive N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline West Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Eagle Rock Way (RRFB Location) N/A N/A N/A N/A Caltrans Other Other Other Other No N/A N/A Other Other Offline 3rd Avenue N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline 7th Avenue N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline 9th Avenue N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Vista Del Sol N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Laguna Canyon Road/Broadway Street (SR-133) Beach Street N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Forest Avenue N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Festival of the Arts N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline Canyon Acres Drive N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline LCAD (Ped Signal/Hawk Location) N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline El Toro Road N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline NB SR-73 Off/On Ramp N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline SB SR-73 Off/On Ramp N/A N/A N/A N/A Caltrans 332 2070 Other Loops No N/A N/A Other Other Offline 71

Page 10 ends

SECTION FOUR

TRAFFIC SIGNAL SYNCHRONIZATION SYSTEM

AND THREE-YEAR PLAN
72

Page 11 ends

3-YEAR OUTLOOK

TRAFFIC SIGNAL SYNCHRONIZATION
Funding Needs for Synchronized Operation (Constrained)
Reporting Jurisdiction Expenditures: City of Laguna Beach Type of Traffic Signal Synchronization Expenditures in Year of Expenditure Dollars

MAINTENANCE
PROJECT FY26/27 FY27/28 FY28/29 TOTAL
Citywide EVP Software Maintenance - $10,000 $10,000 $20,000 Subtotal Maintenance $20,000.00

CONSTRUCTION
PROJECT FY26/27 FY27/28 FY28/29 TOTAL
Subtotal Construction

OPERATIONS
PROJECT FY26/27 FY27/28 FY28/29 TOTAL
Citywide EVP Operations Monitoring - $10,000 $10,000 $20,000 Subtotal Operations $20,000.00
$1,140,000.00
73

Page 12 ends

3-YEAR OUTLOOK

TRAFFIC SIGNAL SYNCHRONIZATION
Funding Needs for Synchronized Operation (Unconstrained) Reporting Jurisdiction Expenditures: City of Laguna Beach Type of Traffic Signal Synchronization Expenditures in Year of Expenditure Dollars

MAINTENANCE
PROJECT FY26/27 FY27/28 FY28/29 TOTAL
Citywide EVP Software Maintenance - $10,000 $10,000 $20,000 Subtotal Maintenance $20,000.00
CONSTRUCTION (City’s share of costs)
PROJECT FY26/27 FY27/28 FY28/29 TOTAL
Pacific Coast Highway and Laguna Canyon
Road/Broadway Street TSSP - $1,000,000 - $1,000,000
El Toro Road TSSP - - $90,000 $90,000
(please see table on next page for details)
Subtotal Construction $1,090,000.00

OPERATIONS
PROJECT FY26/27 FY27/28 FY28/29 TOTAL
Citywide EVP Operations Monitoring - $10,000 $10,000 $20,000 Subtotal Operations $20,000.00
$1,130,000.00
74

Page 13 ends

LSSP IMPLEMENTATION – CANDIDATE SIGNAL

SYNCHRONIZATION PROJECTS WITH ESTIMATED COSTS
Reporting Jurisdiction Expenditures: City of Laguna Beach Following are corridor improvements, with a summary description and cost, which are considered candidate projects that the City of Laguna Beach desires to pursue upon available funding:

CORRIDOR IMPROVEMENT SUMMARY ESTIMATED
COST
Pacific Coast Highway
(SR-1):

School/State Park to
Doheny Park Road
Install Emergency Vehicle Pre-Emption devises, prepare and implement signal timing programs, provide maintenance and support, prepare before and after studies, etc.
$750,000.00
Laguna Canyon Road /
Broadway Street (SR133)
SR-1 to SR-73
Install Emergency Vehicle Pre-Emption devises, prepare and implement signal timing programs, provide maintenance and support, prepare before and after studies, etc.
$250,000.00
El Toro Road:

SR-133 to Bells Viero
Lane/Artisan Drive
Install Emergency Vehicle Pre-Emption devises, prepare and implement signal timing programs, provide maintenance and support, prepare before and after studies, etc.
$90,000.00
Total Estimated Cost: $1,090,000.00
75

Page 14 ends

SECTION FIVE

TRAFFIC SIGNAL SYNCHRONIZATION REVIEW, REVISION,

AND ASSESSMENT
76

Page 15 ends

Corridor Assessment
The City of Laguna Beach does not maintain, own, or operate any traffic signals in the City. However, through local partnerships we hope we will be able to be considered for future project funding.

Specific Corridor Project Assessment
As previously mentioned, the City of Laguna Beach does not maintain, own, or operate any traffic signals in the City. However, through local partnerships we hope we will be able to be considered for future project funding.

Priorities, Approach, and System Plan
The City strives to move traffic regionally in a safe manner along our corridors, reducing commuter travel times and stops, while minimizing side-street delays that serve our citizens. Collaborating with our local partners will include periodic review of all coordination timing with every city arterial.

Through this collaboration, the City will assure that the signal timing is maintained and is periodically evaluated and fine-tuned in response to changing traffic conditions, volumes and patterns. The review of other consultants’ signal synchronization timing is also included when applicable.

The City’s is currently interested in upgrading intersections, specifically identifying the need for emergency pre-emption devices along SR-1, SR-133 and El Toro Road to facilitate the safe and efficient movement of emergency vehicles in the City. In addition, the City desires to continue participating in future Regional Master Plan corridor projects. 77

Page 16 ends

TABLE A

REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT, REVIEW, &

REVISIONS

LOCAL AGENCY CORRIDOR TIMING

REVIEWED
(Past 3 Years)
DID
TIMING

REQUIRE
AN
UPDATE?
TIMING UPDATE RESULTS (if
available)
Speed Travel Stops per mile Greens per
red CSPI Score*
Before After Before After Before After Before After
Pacific Coast Highway (SR-1) No N/A
Laguna Canyon Road / Broadway Street (SR-133) No N/A
El Toro Road No N/A

TABLE B

SIGNAL TIMING REVISIONS
PROJECT CORRIDOR CROSS STREET CYCLE LENGTH (Before/After) N/A – None at the moment
78

Page 17 ends