Cities Index.
Attach 9 - Cost-Benefit

Laguna Beach City Council
October 13, 2026

Document
Attach 9 - Cost-Benefit
Meeting
October 13, 2026
Body
Laguna Beach City Council
Original file
211 KB
Text extracted from the city's file for reading and search. Open the original on lagunabeachcity.primegov.com. That file is the official record.

Cost-Benefit Analysis for Phase One Fleet Electrification Scenario 1: Projected Fuel Costs
The cost-benefit analysis compares the cost of transitioning the internal combustion engine (ICE) vehicles supported by the Phase 1 charging infrastructure project to electric vehicles (EVs) against a “do-nothing” scenario in which the City continues to operate and replace these vehicles with comparable gasoline- and diesel-powered vehicles.

Key Results
• The Phase 1 charging infrastructure project is intended to support charging for 118 City owned vehicles including light, medium, and heavy duty vehicles • Over the 10-year analysis period, the EV scenario has an estimated total cost of approximately $31.5 million, compared with $34.1 million for the ICE scenario. • This results in approximately $2.8 million in net savings, or about a 8% reduction in total lifecycle costs.
• These savings are achieved despite the substantially higher upfront cost of purchasing EVs and installing the necessary charging infrastructure. • The primary drivers of the savings are:
o Approximately $9.3 million in fuel savings over 10 years, a 60% reduction compared with gasoline and diesel.
o Approximately $1.7 million in maintenance savings, a 37% reduction. o Approximately $3.95 million in HVIP and SCE incentives, LCFS credit revenues, and recent funding from South Coast AQMD (MSRC) that further reduce the cost of electrification.

Table 1. 10-Year Cost Comparison – ICE vs. EV Scenario
Cost Element ICE Scenario EV Scenario Change with EV Adoption Vehicle Cost $14,245,632 $20,971,452 +$6,725,820
Fuel / Electricity Cost $15,485,349 $6,184,750 -$9,300,599 Maintenance Cost $4,649,235 $2,923,059 -$1,726,176
EVSE Capital $1,779,518.12 +$1,779,518
Engineering & Construction $3,643,536.56 +$3,643,537
HVIP Incentive ($1,110,000) -$1,110,000
SCE Rebate – Make Ready ($890,155) -$890,155
SCE Rebate – Transit Chargers ($235,000) -$235,000
LCFS Credit ($1,462,941) -$1,462,941
MSRC Funding ($250,000) -$250,000
Total 10-Year Cost $34,380,215 $31,554,219 -$2,825,997
Note: A positive value in the “Change with EV Adoption” column represents an additional cost associated with electrification, while a negative value represents a cost reduction, incentive, or revenue.

What Drives the Cost Difference?
• Higher vehicle acquisition cost: Purchasing the EVs costs approximately $6.7 million more than purchasing comparable ICE vehicles.
• Charging infrastructure investment: The EV scenario requires an additional $5.4 million for EVSE equipment, engineering, and construction.
• Fuel savings: These additional capital costs are substantially offset by approximately $9.3 million in fuel savings. Electricity costs are approximately $6.2 million over 10 years compared with $15.5 million for gasoline and diesel.
• Maintenance savings: EV adoption reduces estimated maintenance expenditures by another $1.7 million over 10 years.
• Incentives and LCFS revenues: HVIP, SCE rebates, funding from South Coast AQMD MSRC and LCFS credits provide approximately $3.95 million in additional cost offsets. • Net result: After accounting for all costs and benefits, the EV scenario is approximately $2.8 million less expensive over 10 years than continuing with ICE vehicles. -$3.95
$14.2
$21.0
$15
$6
$5
$3
$1.78
$3.64
($10)
($5)
$0
$5
$10
$15
$20
$25
$30
$35
$40
Internal Combustion
Engine Electric Vehicles
Millions
Engineering & Construction
EVSE Capital
Maintenance Cost
Fuel Cost
Vehicle Cost
Incentives
Total of $31.6M (after incentives)
Total of $34.4M
SCE rebates: $1.1M
HVIP: $1.1M
LCFS:$1.5M
MSRC: $250k
Key Assumptions
• The analysis assumes a 10-year useful life and that the City replaces the vehicles at the end of this period. This is a conservative assumption; using a 15-year useful life results in substantially greater savings from electrification because fuel and maintenance savings continue for an additional five years.
• Energy prices are based on recent/current costs of $6.00/gallon for gasoline, $7.20/gallon for diesel, and approximately $0.25/kWh for electricity under applicable SCE rates (TOUEV-9). • Vehicle acquisition costs incorporate recent manufacturer/vendor quotes, including current pricing for trolleys and other medium- and heavy-duty vehicles. • Charging infrastructure costs use actual PowerFlex project costs for the City Hall and Corporation Yard installations rather than generalized charging infrastructure assumptions.
• The analysis incorporates currently available HVIP incentives, SCE make-ready and transit charger rebates, funding approved by South Coast AQMD MSRC program and LCFS credit revenues.
• The City was awarded $250,000 through the MSRC Zero-Emission Transit Bus Incentive Program to support the purchase of two Class 4–6 electric trolleys and associated charging infrastructure.
• The award includes $100,000 per electric trolley ($200,000 total) and $50,000 toward trolley charging infrastructure.

Cost-Benefit Analysis for Phase One Fleet Electrification Scenario 2: Reduced Fuel Costs
The cost-benefit analysis compares the cost of transitioning the internal combustion engine (ICE) vehicles supported by the Phase 1 charging infrastructure project to electric vehicles (EVs) against a “do-nothing” scenario in which the City continues to operate and replace these vehicles with comparable gasoline- and diesel-powered vehicles.

Key Results
• The Phase 1 charging infrastructure project is intended to support charging for 118 City owned vehicles including light, medium, and heavy duty vehicles • Over the 10-year analysis period, the EV scenario has an estimated total cost of approximately $31.5 million, compared with $31.8 million for the ICE scenario. • This results in approximately $250,000 in net savings. • These savings are achieved despite the substantially higher upfront cost of purchasing EVs and installing the necessary charging infrastructure. • The primary drivers of the savings are:
o Approximately $6.7 million in fuel savings over 10 years, a 52% reduction compared with gasoline and diesel.
o Approximately $1.7 million in maintenance savings, a 37% reduction. o Approximately $3.95 million in HVIP and SCE incentives, LCFS credit revenues, and recent funding from South Coast AQMD (MSRC) that further reduce the cost of electrification.

Table 1. 10-Year Cost Comparison – ICE vs. EV Scenario
Cost Element ICE Scenario EV Scenario Change with EV Adoption Vehicle Cost $14,245,632 $20,971,452 +$6,725,820
Fuel / Electricity Cost $12,904,457 $6,184,750 -$6,719,707 Maintenance Cost $4,649,235 $2,923,059 -$1,726,176
EVSE Capital $1,779,518.12 +$1,779,518
Engineering & Construction $3,643,536.56 +$3,643,537
HVIP Incentive ($1,110,000) -$1,110,000
SCE Rebate – Make Ready ($890,155) -$890,155
SCE Rebate – Transit Chargers ($235,000) -$235,000
LCFS Credit ($1,462,941) -$1,462,941
MSRC Funding ($250,000) -$250,000
Total 10-Year Cost $31,799,324 $31,554,219 -$245,105
Note: A positive value in the “Change with EV Adoption” column represents an additional cost associated with electrification, while a negative value represents a cost reduction, incentive, or revenue.

What Drives the Cost Difference?
• Higher vehicle acquisition cost: Purchasing the EVs costs approximately $6.7 million more than purchasing comparable ICE vehicles.
• Charging infrastructure investment: The EV scenario requires an additional $5.4 million for EVSE equipment, engineering, and construction.
• Fuel savings: These additional capital costs are substantially offset by approximately $6.7 million in fuel savings. Electricity costs are approximately $6.2 million over 10 years compared with $12.9 million for gasoline and diesel.
• Maintenance savings: EV adoption reduces estimated maintenance expenditures by another $1.7 million over 10 years.
• Incentives and LCFS revenues: HVIP, SCE rebates, funding from South Coast AQMD MSRC and LCFS credits provide approximately $3.95 million in additional cost offsets. • Net result: After accounting for all costs and benefits, the EV scenario is approximately $2.8 million less expensive over 10 years than continuing with ICE vehicles. -$3.95
$14.2
$21.0
$13
$6
$5 $3
$1.78
$3.64
($10)
($5)
$0
$5
$10
$15
$20
$25
$30
$35
$40
Internal Combustion
Engine Electric Vehicles
Millions
Engineering & Construction
EVSE Capital
Maintenance Cost
Fuel Cost
Vehicle Cost
Incentives
Total of $31.6M (after incentives)
Total of $31.8M
SCE rebates: $1.1M
HVIP: $1.1M
LCFS:$1.5M
MSRC: $250k
Key Assumptions
• The analysis assumes a 10-year useful life and that the City replaces the vehicles at the end of this period. This is a conservative assumption; using a 15-year useful life results in substantially greater savings from electrification because fuel and maintenance savings continue for an additional five years.
• Energy prices are based on recent/current costs of $5.00/gallon for gasoline, $6.00/gallon for diesel, and approximately $0.25/kWh for electricity under applicable SCE rates (TOU-EV-9).
• Vehicle acquisition costs incorporate recent manufacturer/vendor quotes, including current pricing for trolleys and other medium- and heavy-duty vehicles. • Charging infrastructure costs use actual PowerFlex project costs for the City Hall and Corporation Yard installations rather than generalized charging infrastructure assumptions.
• The analysis incorporates currently available HVIP incentives, SCE make-ready and transit charger rebates, funding approved by South Coast AQMD MSRC program and LCFS credit revenues.
• The City was awarded $250,000 through the MSRC Zero-Emission Transit Bus Incentive Program to support the purchase of two Class 4–6 electric trolleys and associated charging infrastructure.
• The award includes $100,000 per electric trolley ($200,000 total) and $50,000 toward trolley charging infrastructure.