of the RFP process in August 2010. In accordance with City Council Policy No. 105, the City must use a competitive public Request for Proposal on a ten-year timeframe in the selection of a banking service provider. Given the challenges created by the lockdowns from the COVID-19 pandemic and in the interest of maintaining operational stability, the 10-year RFP process was deferred and the banking contract with Union Bank was extended. The current contract for depository services with Union Bank will expire April 1, 2022.

In late December 2021, Staff released an RFP to qualified institutions for the provision of depository and other various banking services. The intent of the competitive selection process is to provide all qualified commercial banks with an equal opportunity to submit a proposal to handle the City primary deposit accounts. This RFP process provides the means to obtain quality services at a competitive price. The RFP encouraged proposing financial institutions to submit the most comprehensive proposal possible, offering the highest level of quality services while providing opportunities for improving the current management of cash flow.

To be considered for selection, the proposing financial institution must have met all of the following qualifications:

1. Be a Federal or State of California chartered financial institution.

2. Be a member of the Federal Reserve System and have access to all services.

3. Be a qualified State depository of public funds under the governing federal and State laws and insurance of funds with FDIC/SAIF.

4. Be a full-service bank in good standing among other comparable banks.

5. Be sufficiently capitalized to accommodate the City’s cash management needs.

6. Be able to perform its obligations under this proposal in compliance with all applicable federal and State laws, regulations, statutes, and policies, as well as compliance with the City’s own investment policy.

7. Be in compliance and good standing with the Community Reinvestment Act.

8. Have a home office or branch facilities located within, or reasonably close, to City limits.

9. Be able to assign experienced and dedicated staff committed and capable of providing services to a public agency.

4.8 Packet Pg. 602
Banking Services
March 22, 2022

Page 3 ends

10. Have the capacity to collateralize its public funds deposits as stipulated under State law.

The selection of a bank is based on the bank’s qualifications as presented in their proposal, overall pricing and costs, experience and success in providing services to similar clients, and ability to provide the services outlined in the RFP.

Three (3) banks submitted a proposal to the City: (1) Union Bank, (2) U.S. Bank, and (3) Bank of the West.

Their proposals were evaluated in accordance with the evaluation criteria described below:
• Financial strength and ability to protect and collateralize City deposits • Overall best value and ability to guarantee pricing for the contract period • Overall experience and dedication to the government market • Qualifications, strength and reliability of the relationship management team • Ability to meet minimum required service levels and bank products • Ability to offer product and service enhancements
• Ability to support products and provide training on-site • Location of bank offices
Determination of best value to the City was based upon, but not limited to, the following considerations:
• Cost
• The ability, capacity, and skill of the proposer to provide the services • The ability of the provider to deliver timely services • The character, integrity, reputation, judgment, experience, and efficiency of the provider
• The quality of the provider’s performance on previous contracts with the City and

4.8 Packet Pg. 603
Banking Services
March 22, 2022

Page 4 ends

other government references
Each proposing bank was asked to meet with Staff to clarify their submitted bid sheet and scope of proposed services in more depth. After a review of the three submitted proposals and meeting with each of the three banks, Staff determined that all three banks demonstrated the ability to meet the requirements as established in the RFP, maintain the City’s current level of service, as well as the ability to provide potential improvements to the current management of cash. Nevertheless, Bank of the West was able to offer the best overall pricing while delivering the same quality of service.

Hence, after considerable evaluation of all the information and material presented, Staff is recommending that the City establish its banking relations with Bank of the West on the basis of overall pricing and best value with extensive government banking experience, as well as its financial condition and ability to protect and collateralize the City’s deposits.

Overall Pricing and Best Value
Based on a comparative analysis of the proposed cost estimates to maintain the City’s existing service level submitted by each bank, Bank of the West’s net estimated monthly charge for services was significantly less than the estimates of the other two banks. The following table provides the estimated service charge from each bank’s proposed fee schedule, utilizing the City’s banking activity for the month of November 2021 as a model.

Monthly
Service Fee
Union Bank $ 1,310.77
Bank of the West $ 875.31
U.S. Bank $ 1,125.63
Additionally, Bank of the West is offering the City an attractive Earning Credit Rate (ECR) at 35 BPS, which is higher than the average effective yield of 21 BPS reported by the State’s Local Agency Investment Fund (LAIF) in its Quarterly Performance Report for the quarter ended December 31, 2021, where the City’s short-term excess cash is primarily invested. The cost of banking services is offset by applying the ECR to the City’s collected balances in non-interest bearing, business checking accounts. These balances result in an earnings credit that is used to offset all or a portion of the City’s monthly fees.

4.8 Packet Pg. 604
Banking Services
March 22, 2022

Page 5 ends

Bank of the West will also provide the City with a generously discounted Deposit Administration Fee, when compared with the rates and fees from the other two banks.

The Deposit Administration Fee is a bank fee associated with the assessment charges and other charges provided by law, which include administrative expenses incurred by the bank in providing depository services, such as FDIC fees, based on the City’s collected balances.

The table below provides a comparison of the net allowance, using the City’s actual bank balances from November 2021.

Earnings
Credit
Rate
ECR
Allowance
Less
Deposit
Admin. Fee
Net ECR
Allowance
Union Bank 0.25% $ 322.91 $ 199.32 $ 123.59
Bank of the West 0.35% $ 452.07 $ 127.57 $ 324.50
U.S. Bank 0.20% $ 258.33 $ 205.76 $ 52.57
Furthermore, Bank of the West is also offering an “implementation incentive” in the form of a waiver of banking service fees for the first three months up to an amount of $9,400, to assist with offsetting fees incurred due to the transition process. U.S. Bank offered a transition credit of $7,500, plus a “new service assistance” credit of $3,500 to implement new services. Union Bank offered the City a “loyalty credit” of $10,000 to offset fees, which would expire after twelve months.

The terms of the contract stipulated in the RFP requires fixed pricing for the first five (5) years of the contract.

Experience in Government Banking
Bank of the West has been servicing the public sector since its establishment in 1874, with experience working with states, counties, cities, and special districts. Their government banking services were determined to be on par with those provided by the other two proposing banks.

In 2008, Bank of the West established a Government Banking Division, which includes a core team of ten bankers that specialize in providing the unique banking needs of municipalities and local government. Bank of the West also has over twenty bankers across various bank departments, including, but not limited to, public finance, customer service, implementation, product management, treasury management fixed income, merchant services, commercial card and operations.

4.8 Packet Pg. 605
Banking Services
March 22, 2022

Page 6 ends

In addition, the City will be provided with a local, dedicated Government Customer Service Specialist team that can handle all of the City’s day-to-day banking services inquiries. This customer service team’s specific focus on governmental agencies should ensure the City receives the same level of service it has become accustomed to with its current banking relationship.

On an as-needed basis, the closest branch to the City to conduct walk-in branch deposits, in the rare occasion that the need arises, is located at 26941 Crown Valley Parkway, in Mission Viejo. The main City deposit activity is completed through virtual remote deposit or via armored transport services.

Financial Condition
Bank of the West is chartered in the State of California and is insured by the FDIC. The bank also has a full relationship with the Federal Reserve and is managed through the National Account Program with access to their full suite of services. It is one of the largest banks headquartered in California and the 31st largest commercial bank in the United States by assets.

In addition, Bank of the West is a designated State Depository Bank for the State of California and maintains a direct banking relationship with the State Treasurer’s Office and the State Controller’s Office. As of December 31, 2021, Bank of the West has over $8.4 billion in public fund deposits and over 3,300 accounts that are collateralized in accordance with the State’s Government Code and other applicable laws.

Bank of the West has also demonstrated financial strength and strong credit rates. A copy of Bank of the West’s 2021 Annual Profile Report is included as Attachment B to the Staff Report. Also, provided below is a snapshot of the credit ratings for both the bank and its holding company, as well as its capital ratios.

4.8 Packet Pg. 606
Banking Services
March 22, 2022

Page 7 ends

Furthermore, as recently announced, BNP Paribas, Bank of the West’s parent company, has reached an agreement for Bank of the West to combine with BMO Financial Group, which is the eighth largest bank in North America and has an established presence in the U.S. The completion of this transaction is expected in late 2022.

The proposed agreement for banking services with Bank of the West, the “Contract for Deposit of Public Funds”, a standardized agreement, along with other related banking forms are available in the City Clerk’s department for inspection.

FISCAL IMPACT:

Given the discounted banking fees and ECR allowance offered by Bank of the West, a substantial net cost savings is anticipated when compared with the City’s current contract with Union Bank. Staff estimates roughly a 50% reduction in net banking fees.

ATTACHMENTS:
• Attachment A - Proposed Resolution
• Attachment B - BOTW 2021 Annual Profile Report

4.8 Packet Pg. 607
RESOLUTION NO. 2022-03-22-X

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

LAGUNA HILLS, CALIFORNIA, ESTABLISHING BANKING

RELATIONS WITH BANK OF THE WEST, DESIGNATING

THE PERSONS AUTHORIZED TO TRANSACT BUSINESS

ON BEHALF OF THE CITY, AND RESCINDING
RESOLUTION NO. 2010-08-24-1.

WHEREAS, pursuant to City Council Policy No. 105, Financial Policies, in the selection of banking services, a competitive public request for proposal process must be issued on a ten (10) year basis; and
WHEREAS, the City’s current banking relationship has reached the tenyear timeframe and a Request for Proposal was issued to all commercial banking institutions for the provision of depository and other various needed banking services; and
WHEREAS, after considerable evaluation of all the information and materials received in each Proposal, it was determined the City will be best served by establishing a new primary banking relationship with Bank of the West.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAGUNA

HILLS, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

SECTION 1. This Resolution rescinds Resolution No 2010-08-24-1, effective upon the final and orderly transfer of the City’s bank accounts and termination of such other banking activities with Union Bank.

SECTION 2. The City Council hereby establishes banking relations with Bank of the West (the “Bank”) upon such terms as set forth in the Contract for Deposits of Public Funds (“Agreement”). The Mayor, City Manager, or Finance Director are authorized to execute the Agreement to provide banking services and open and maintain the City’s deposit accounts.

SECTION 3. The City Council hereby authorize the Mayor, Mayor Pro Tempore, City Manager, or Finance Director of the City of Laguna Hills to draw checks on the City’s Accounts and the Bank is authorized to honor and pay all checks if properly signed, including those drawn to the order of any officer or any other persons authorized to sign them.

SECTION 4. This resolution shall become effective immediately upon its adoption.

4.8.a
Packet Pg. 608 Attachment: Attachment A - Proposed Resolution (2773 : Banking Services) Resolution No. 2022-03-22-x
2 PASSED, APPROVED, AND ADOPTED this 22
nd day of March 2022.
____________________________________

DAVE WHEELER, MAYOR
ATTEST:
______________________________________

MELISSA AU-YEUNG, CITY CLERK

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss

CITY OF LAGUNA HILLS )
I, Melissa Au-Yeung, City Clerk of the City of Laguna Hills, California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of Resolution No. 2022- 03-22-X adopted by the City Council of the City of Laguna Hills, California, at a Regular Meeting thereof held on the 22
nd day of March, 2022, by the following vote:

AYES:

NOES: None
ABSENT: None
ABSTAIN: None
(SEAL)
_____________________________________

MELISSA AU-YEUNG, CITY CLERK

4.8.a
Packet Pg. 609 Attachment: Attachment A - Proposed Resolution (2773 : Banking Services)

ANNUAL PROFILE
2021

CORPORATE PROFILE
At Bank of the West, we offer customers retail, wealth, corporate, commercial, and business banking products and services. Headquartered in San Francisco, California, we are an FDICinsured bank with community banking roots dating back more than 140 years.

As a leader in sustainable banking, Bank of the West uses its financial strength to support growth that protects the planet and contributes to a more equitable society. Bank of the West has the strongest environmental stance of any major bank, a diverse leadership team, and a global reach and impact unmatched by any other bank operating in the United States.

Through digital channels, more than 500 branches, and offices across 24 states, we provide financial tools and resources to individuals, families and businesses. We also offer investment and insurance services through our subsidiary, BancWest Investment Services, a registered broker/dealer.

As the bank for a changing world, along with our parent BNP Paribas, Bank of the West has a mission to drive responsible, sustainable growth that makes our planet and economy thrive today and for future generations.
2021 RESULTS
Bank of the West achieved full year 2021 earnings of $974.5 million. It was a record high result, up 64.2% vs. prior year primarily driven by higher net banking income, flat expenses and significantly lower cost of risk.

Net banking income grew 2.5% compared to prior year with strong syndication income, securities gain on sale and improved transactional fees, while net interest income was lower with better cost of funds offset by lower loan volume and lower net interest margin. Operating expenses remained flat to prior year reflecting solid expense control.

Total average customer deposits rose 10.5% from prior year, continuing the growth since 2020 due to strong customer liquidity, while the loan portfolio decreased by 6.9% vs. prior year due to lower line usage and faster prepayments for most of the year.

Efficiency ratio improved to 61.4% for 2021, better by 146bps compared to prior year. RONE increased to 17.02%, up 676bps compared to prior year with strong earning and lower RWA, while capital ratios remain strong (Tier 1 Capital Ratio 14.18% or 45bps favorable to prior year).

Bank of the West’s parent company BNP Paribas earned 9.5 billion euros in the year ending 31 December 2021, up 34.3% compared to prior year.

KEY FIGURES As of 12/31/2021
ASSETS
$104.8B

DEPOSITS
$89.5B

LOANS & LEASES
$57.4B
*RETAIL BANKING

LOCATIONS
502
*Does not include satellite and hub locations
**Customer count includes bank-wide individual and business accounts (does not include secondary customers)
ATMS
1,023
**CUSTOMERS

1.7M

TEAM MEMBERS
9,329

COMMUNITY CONTRIBUTIONS
(ANNUAL)
$5.9M

4.8.b
Packet Pg. 610 Attachment: Attachment B - BOTW 2021 Annual Profile Report (2773 : Banking Services)

TIER I RISK-BASED

CAPITAL RATIO

14.18%

TOTAL RISK-BASED

CAPITAL RATIO

15.37%
TIER I

LEVERAGE RATIO

10.05%
Deposits
Assets
$80
$60
$40
$20
$0
2015
54 76
2020
80 96
2016
62 84
2017
70 90
2018
67 88
2019
71 93
A3 P-1
A A-1
F1
MOODY’S
STANDARD & POOR’S
FITCH
Long-term
issuer
Short-term
issuer
Aa3
Long-term
deposits
Short-term
deposits
A+
P-1
A F1

FINANCIAL HIGHLIGHTS
Deposits & Assets (dollars in billions)
CREDIT RATINGS As of 12/31/2021
LOAN PORTFOLIO As of 12/31/2021
Consumer 24% Installment Loans
1% Other
Commercial, Financial 27% & Agricultural
3%
2%
26% Real Estate
Commercial
Real Estate
Construction
Equipment
Leases
17% Real Estate
Residential
CAPITAL RATIOS As of 12/31/2021
1 S&P Global Market Intelligence (based on FDIC data as of 12/31/2021) 2 S&P Global Market Intelligence (based on FDIC data as of 12/31/2021) 3 Market Share Reporting via Statisticalsurveys.com

LEADERSHIP
Bank of the West is one of the largest banks headquartered in California and the 32nd largest1 commercial bank in the U.S. by assets.

While Bank of the West is one of the largest banks in the U.S., we take pride in preserving our local focus, our award-winning relationship banking approach, and being among the industry-leading banks for customer service.

The bank is the third-largest agriculture production loans bank lender2, and a leading bank lender in the RV/Marine and religious institution sectors3.

Bank of the West also serves clients through offices in Atlanta, Chicago, Dallas and New York, our international offices in Tokyo and Taipei, and works in tandem with the Network Business Development Desk of BNP Paribas China which has branches in Shanghai, Beijing, Tianjin, Guangzhou and a representative in Chengdu.

Annual Profile | 2021

AWARDS & ACCOLADES
Disability Equality Index
Best Places to Work for Disability Inclusion, 2021
Family Wealth Report: Family Wealth
Counseling
Private Asset Management: Best Consulting
Firm for Family Offices, 2018
Global Finance
Best Private Bank U.S. West, 2019
Fast Company
World Changing Ideas, 2020-2021
Forbes
America’s Best-In-State Employers 2020-2021
Best Employers for Diversity, 2020
Best Employers for Women, 2019-2020
Human Rights Campaign (HRC) Foundation
Corporate Equality Index
Bank of the West earns 100% Score,
2019-2022
World Finance
Best Commercial Bank U.S. West, 2014-2020
Member FDIC. Equal Housing Lender. © 2022 Bank of the West. Doing business in South Dakota as Bank of the West California 2021
90 105
$100

4.8.b
Packet Pg. 611 Attachment: Attachment B - BOTW 2021 Annual Profile Report (2773 : Banking Services) City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 22, 2022
TO: Mayor and Council Members
FROM: Larry Longenecker
Community Development Director
ISSUE: 2021 General Plan Annual Progress Report
RECOMMENDATION: That the City Council approve and direct Staff to forward the 2021 General Plan Annual Progress Report and Housing Element Annual Progress Report-Housing Implementation to the State of California Department of Housing and Community Development (HCD).

SUMMARY:

State law requires each city to submit an annual progress report to the State describing steps it took to implement its General Plan during the previous calendar year. In addition to documenting the City’s general progress for the State, the annual report provides the City Council with a snapshot of how the City has implemented the General Plan and assists the State in understanding how each jurisdiction is progressing toward meeting its assigned regional housing needs.

Attached is the City’s 2021 General Plan Annual Progress Report (APR), which provides the status of the City’s General Plan implementation efforts and the purpose of each General Plan Element (i.e. Land Use, Mobility, Conservation and Open Space, Community Services and Facilities, Safety, Noise, and Housing). The activities described in the APR depict the major accomplishments during 2021, and do not reflect every aspect of an adopted goal or policy which may be more routine in nature.

BACKGROUND:

The City’s General Plan was updated in 2009 and includes an Updated Housing Element,

4.9 Packet Pg. 612
2021 General Plan Annual Progress Report
March 22, 2022

Page 2 ends

for the planning period covering 2013-2021. Government Code Section 65400 requires that all cities and counties submit to their legislative bodies an annual report on the status of the General Plan and progress made in its implementation. Senate Bill No. 375 (adopted in 2008) requires that the Annual Progress Report (APR) include a section describing the actions taken by the local government to complete the programs and meet the deadlines specified in the Housing Element. SB 375 builds on the existing framework of regional planning to tie together the regional allocation of housing needs and regional transportation planning in an effort to reduce greenhouse gas (GHG) emissions.

Previously, there were no consequences if a local government failed to prepare an APR.

However, with the enactment of SB 375, failure to comply with the reporting requirements can now lead to court injunctions and sanctions. The APR must be submitted to HCD and the Governor’s Office of Planning and Research by April 1st of each year. Further, the enactment of SB 35 by the State in 2017 could lead to negative consequences for the City if an APR is not filed. Generally, failure by the City to file an APR could require the City to approve any proposed housing development if it meets State-mandated affordable housing requirements.

The State of California has created a standardized format that each city is expected to use in preparing the APR on the status of the Housing Element and the City’s progress in implementing its goals and programs. These forms are included in the attached City’s APR. Following the City Council’s review of the 2021 APR, Staff will forward the APR to the State of California by the deadline established in law.

CEQA FINDINGS:

A General Plan Annual Report is not considered a “project” subject to the California Environmental Quality Act (CEQA).

ATTACHMENTS:
• Attachment A - 2021 General Plan Annual Progress Report • Attachment B - HCD FORM

4.9 Packet Pg. 613
General Plan
Annual Progress Report
2021
City of Laguna Hills | Community Development Department March 22, 2022 24035 El Toro Road, Laguna Hills, 92653
949-707-2600
www.lagunahillsca.gov

4.9.a
Packet Pg. 614 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 2 TABLE OF CONTENTS
OVERVIEW ____________________________________________________ 3 General Plan Background __________________________________________________ 3 DEVELOPMENT ACTIVITY _______________________________________ 5 Planning Activity __________________________________________________________ 5 Building Permit Activity ____________________________________________________ 6 Code Compliance Activity __________________________________________________ 6 GENERAL PLAN ELEMENTS ______________________________________ 7 General Plan Implementation Status __________________________________________ 7 Land Use Element ________________________________________________________ 7 Mobility Element __________________________________________________________ 9 Housing Element ________________________________________________________ 10 Conservation and Open Space _____________________________________________ 11 Noise _________________________________________________________________ 12 Safety _________________________________________________________________ 14 Community Services and Facilities __________________________________________ 15 CONCLUSION _________________________________________________ 17

4.9.a
Packet Pg. 615 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 3 OVERVIEW
Government Code Section 65400 mandates that all cities and counties submit to their legislative bodies an  annual  report  on  the  status  of  the  General  Plan  and  progress  in  its  implementation;  otherwise referred  to as  the “Annual  Progress Report.”  The Annual  Progress Report is intended as a  tool  for informing local legislative bodies of the jurisdiction’s effectiveness in implementing its General Plan.  A copy of the Annual Progress Report must also be sent to the Governor’s Office of Planning and Research (OPR) and the Department of Housing and Community Development (HCD).

The purpose and intent of this statute is to ensure that the General Plan directs all land use decisions and remains an effective guide for the long‐term physical development of a community.  The Annual Progress Report is a tool for doing this.  The Annual Progress Report provides a correlation between land use decisions that have been made during the 12‐month reporting period and the goals, policies and implementation programs of the adopted General Plan.

Providing a copy of the Annual Progress Report to OPR provides information that allows OPR to monitor local planning activities and to identify trends in land use planning and decision‐making throughout the State  of  California.    The  information  is  necessary  for  OPR  to  serve  in  its  capacity  as  the  statewide planning agency.  It can also provide the State with information to identify necessary modifications and improvements  to  its  General  Plan  Guidelines,  while  serving  to  apprise  state  government  of  local planning activities and facilitating the legislative process as it pertains to land use and local planning issues.

Providing  a  copy  of  this  report  to  HCD  fulfills  a  statutory  requirement  to  report  certain  housing information, including the local agency’s progress in meeting its share of regional housing needs and local  efforts  to  remove  governmental  constraints  to  the  development  of  housing  (as  defined  in Government Code Sections 65584 and 65583(c)(3)).

The  focus of  the Annual Progress Report  should be on implementation of  the General Plan’s goals, policies  and  implementation  measures.    It  can  provide  information  to  identify  necessary  “course adjustments” or modifications to the General Plan and means to improve local implementation.  Since there is no specific form provided by OPR, the Annual Progress Report can vary in format and approach from jurisdiction to jurisdiction.

General Plan Background
After an extensive two‐year process, the City adopted a Comprehensive Update to the General Plan in July 2009.  This was the first comprehensive revision of the General Plan since the City’s first general Plan was adopted in 1994.  The General Plan is based on extensive research and analysis of existing conditions,  changing  local  and  regional  conditions,  evolving  trends  in  urban  planning  and  a collaborative partnership with community members through an extensive public participation process.

4.9.a
Packet Pg. 616 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 4 The  Laguna Hills General  Plan is  organized into  ten  sections.   The  sections include an introduction, seven General Plan elements, a general Plan Implementation Program, description of related plans and programs, and a glossary of terms used throughout the General Plan.

The  following seven Laguna Hills General Plan elements encompass all of  the elements  required by California General Plan law:  Land Use, Mobility, Conservation and Open Space, Community Services and Facilities, Safety, Noise, and Housing.   The Laguna Hills General Plan combines  the mandatory Open  Space  and  Conservation  Elements  required  by  State  law,  and  includes  a  separate,  optional element on Community Services and Facilities.

The seven elements are generally organized in a similar format.  Each element contains an Introduction, Background, and Plan section.  The “Introduction” indicates the purpose of each element and how it will help Laguna Hills achieve its vision  for  the community as articulated  through  the eight Guiding Themes.  The “Background” provides the reader with the existing conditions and/or the environmental setting particular to that element topic.  The “Plan” section is composed of three sections:  issues, goals and  policies,  and  approach.    The  issues  section  describes  issues  and  concerns  expressed  by  the community, City staff, and the City Council.  The goals and policies section sets both broad and specific direction for the future of the City based on the identified issues and concerns.  The approach section provides a general description and summary of  the City’s course of action  to achieve  the goals and policies.

The Laguna Hills General Plan also contains the following appendices, which are integral parts of the General Plan:  1) Implementation Program ‐ The Implementation Program follows the elements and identifies the specific actions that will achieve the goals, policies, and plans identified in each element; 2)  Related Plans and Programs ‐ This section identifies plans and programs related to the General Plan and applicable to future activities and land use decisions within Laguna Hills;  3)  Glossary ‐ This section provides definitions for technical terms used throughout the General Plan.

4.9.a
Packet Pg. 617 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 5 DEVELOPMENT ACTIVITY
In 2021, the City reviewed numerous projects through the development review process and participated in numerous planning efforts. The following summaries provide a general overview of the projects, programs, and permits that were reviewed. These summaries are general and are not intended to be exhaustive.

Planning Activity
Noteworthy Projects
• The Village at Laguna Hills (formerly Five Lagunas)
• After  beginning  various  construction  and  development  activities  in  2017,  Merlone‐Geier Partners (MGP), the owner of the former Laguna Hills Mall, had announced in 2018 that it was  taking a strategic pause in  the  redevelopment of  the Mall.  This action by MGP was prompted by the 2018 closures of Macy’s and JC Penney, and all of the businesses in the Mall’s  interior.  MGP  submitted  a  new  project  plan  in  November,  2019,  and  the  City  is currently processing this application, with public hearings anticipated to conclude in early‐ 2022.
• Redevelopment of Former Automobile Dealership (24888 Alicia Parkway) • The Planning Agency approved permits for two new drive‐thru restaurants on a portion of the property, completing the full development of the site.  The approved project includes the construction of a new 2,175 square‐foot building with a drive‐thru for Starbucks and a new 2,503 square‐foot building with a drive‐thru for Plant Power. Previously, the Planning Agency approved the ActivCare Assisted Living Facility, which opened in 2021, and a Taco Bell, which is currently under construction.

Current Planning
• The Community Development Department approved several Site Development Permits in 2021, including ones for a new local museum, medical offices, and group fitness/martial arts studios. • The Community Development Department approved multiple Temporary Use Permits in 2021, including  Emergency  Temporary  Use  Permits  to  allow  for  outdoor  dining  opportunities  in response to the COVID‐19 Pandemic.

Advanced Planning
• The  Community  Development  Department  commenced  the  next  update to  the  Housing  and Safety Elements of the General Plan.  The Housing Element Update process included both virtual and in‐person outreach workshops in 2021, and is anticipated to conclude in mid‐2022.

4.9.a
Packet Pg. 618 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 6 New Businesses
• In  an  effort  to  promote  a  business‐friendly  environment,  the  City  has  emphasized  providing resources and support for the local business community and to businesses looking to locate in the  City.    Consequently,  the  Community  Development  Department  has  met  with  several commercial  property  owners  and  has  maintained  a  regular  dialogue  regarding  issues  that impact  parking,  leasing,  uses, and  signage.   In  addition,  staff  has assisted  several  owners  in evaluating conceptual plans for remodeling activities.

With the support of the Community Development Department, several businesses have been able to locate in the City.  The Department issued nearly 50 Certificates of Use and Occupancy for new businesses.  By providing assistance to businesses regarding best practices in obtaining zoning permits necessary to begin tenant renovations, staff has contributed to processes that support businesses.

Building Permit Activity
 In 2021,  the Building Division issued approximately 1,372 building permits.  General  remodeling activity  in  residential  (355  permits)  and  commercial  (47  permits)  properties  continues  to  drive building  activity  in  the  City.    For  building  inspection,  the  City  provided  approximately  3,260 inspections.

Code Compliance Activity
 In  2021,  the  City’s  Code  Compliance  services  continued  to  obtain  voluntary  compliance  from residents  and  businesses  through  frequent  engagement,  maintaining  a  consistent  presence  in commercial areas prone to violations, and the implementation of code enforcement processes that resolve  potential  violations  before  the  need  for  formal  prosecution.    Complaints  concerning potential violations on residential properties generated over 385 calls for service, while complaints regarding commercial properties resulted in over 100 calls for service.  In a few instances, cases had to be referred to the City Attorney’s office for additional assistance.

4.9.a
Packet Pg. 619 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 7 GENERAL PLAN ELEMENTS
General Plan Implementation Status
The tables below analyze selected General Plan programs and policies that made notable progress in 2021.  These are not a comprehensive list of all programs, policies, and action items in the General Plan; many are under ongoing implementation, and may not be listed here.  As  the majority of  the General Plan policies and related items have been implemented through the adoption of ordinances or resolutions, incorporated into the regular governmental activities of the respective departments, or included in development proposals as they are reviewed for consistency with the City’s policies, the purpose  of  providing  the  implementation  statuses  below  is  simply  to  highlight  annual  progress.    A comprehensive list of all General Plan policies and action items with status and/or implementation can be viewed in the General Plan and prior General Plan Annual Progress Reports.

Land Use Element
The  Land  Use  Element  is  the  foundation  of  the  General  Plan  and serves  as  a  compass  that  guides citizens, planners, and decision makers on the desired pattern of growth, development, and change in Laguna Hills.  This Element describes both existing and future land use activities and unifies the other elements of the General Plan by providing an overall policy context.  The Land Use Element deals with the central issues of development and growth, and the quality of the community, and helps define the desired balance among  the social, environmental, and economic costs and benefits associated with growth.

The Land Use Element identifies the distribution, location, and intensity of all land use types throughout the City.  Text, maps, and diagrams establish the direction for land uses within the City and describe how these uses are integrated with other General Plan Elements and policies.

As a built‐out community with no remaining residential or commercial vacant land, new development opportunities  are  focused  on  larger  existing  developed  parcels  that  are  considered  underutilized and/or can be reasonably intensified by incorporating parking structures within parking lot areas.  The Laguna  Hills  Mall  and  the  Oakbrook  Village  Shopping  Center  are  both  examples  of  these  new development opportunities and are zoned for a range of mixed land uses, including residential uses.

The General Plan focuses on those sites within the community that have redevelopment potential.

4.9.a
Packet Pg. 620 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 8 Land Use Element Background
Original Adoption Date  2009 (with Comprehensive General Plan Update) Previous Amendments
2000  West‐side annexation
2001  Saddleback Valley Unified School District Surplus Property Land Use Designation Change
2014  “Hospitality Overlay Zone” in North Laguna Hills
2017  Amend “Hospitality Overlay Zone” to increase the allowable building area
2021 Amendments None
Land Use Element Implementation
Program
LU‐1. Balanced Growth
Review  discretionary  development  proposals  to  assess  the  project’s  effect  on  the community’s  jobs/housing  balance  and  fiscal  stability.    Ensure  developments  provide their  fair  share  of  infrastructure  such  as  utilities,  roads,  parks,  and  recreational opportunities or pay in lieu fees toward the development/extension of these facilities.

Policies  LU‐1.1, 1.2, 1.3
Status  Ongoing
The planning projects approved in 2021, particularly  the Starbucks and Plant Power projects, are subject to a variety of development impact fees and in‐lieu fees, and have been designed to meet utility and infrastructure requirements.

Program
LU‐2. CEQA Review
Ensure all projects are reviewed and processed per CEQA.

Policies  LU‐4.6
Status  Ongoing
All projects have been reviewed per CEQA requirements.  To  further support staff on CEQA review, the Community Development Department continued to utilize qualified on‐call CEQA consultants throughout the year.  Furthermore, in September  2021,  the  City  adopted  updated  Vehicle  Miles  Traveled  Analysis Guidelines which establish thresholds of significance to be used for evaluating transportation impacts within the City. The VMT Guidelines incorporate initial screening criteria which, if met, demonstrate  that a project will not  result in significant impacts due to VMT without the need for a detailed VMT study.

4.9.a
Packet Pg. 621 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 9 Program
LU‐5. Community Participation
Use the City’s website, newsletters, advertisements, and other measures to inform the community of and encourage participation at civic and community events.  Continue to coordinate  the  City’s  Traffic  and  Community  Services  Commissions,  which  provide  for resident input on these issues.

Policies  LU‐1.7, 1.8
Status  Ongoing
Staff  continues  to  provide  meeting  agendas  and  project  information  on  the City’s  website.    Staff  has  promoted  and  advertised  community  events  in creative ways  that ensure all segments of  the community are encouraged  to participate.

Program
LU‐6. Compatibility Assessment and Buffering
Review  discretionary  development  proposals  to  assess  the  compatibility  of  proposed development with adjacent/surrounding uses and activities. Require site design, buffers, architectural  and  buffering  techniques,  and  other  measures  are  incorporated  into projects to ensure compatibility between uses and activities.

Policies  LU‐2.5, 2.6, 2.7, 2.8
Status  Ongoing
Planning projects approved in 2021 were assessed  for compatibility with  the existing built environment.  Where required, landscaping buffers, architectural enhancements, additional setbacks, and conditions of approval were required for  projects  to  remain  compatible  and  to  minimize  impacts  to  surrounding neighborhoods and land uses.

Mobility Element
The  Mobility  Element  describes  existing  and  future  transportation  conditions  and  systems.    The Element  establishes  goals  and  policies  that  will  guide  the  City’s  mobility  system,  including  streets, transit facilities and services, bicycle and pedestrian facilities, and the recreational trail system.  The text, maps, and diagrams are a basis for the development of the City’s approach to maintaining and improving the mobility network.

Mobility Element Background
Original Adoption Date  2009 (with Comprehensive General Plan Update) Previous Amendments  2013  Minor changes made to the Orange County Master Plan of Arterial Highways

4.9.a
Packet Pg. 622 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 10 2017  Avenida De La Carlota right‐of‐way configuration 2021 Amendments None
Mobility Element Implementation
Program
M‐1. Mobility Planning and Traffic Analysis
Review discretionary development proposals  for potential impacts  to  the mobility and infrastructure systems and to ensure the street system meets City standards. The level of service  standards  established  in  the  Mobility  Element  will  be  used  to  determine  the significance of impacts. Intersection level of service will be determined by the volume to capacity ratio and the Highway Capacity Manual calculations. Mitigation in the form of physical  improvements  and/or  impact  fees  will  be  required  to  reduce  the  significant impacts. As part of this program, the City will coordinate with local jurisdictions to reduce the impacts of development in Laguna Hills on adjacent jurisdictions.

Policies  M‐1.3
Status  Ongoing
When applicable, the Public Services Department reviewed planning projects in 2021,  and  if  necessary,  required  projects to minimize  traffic  impacts  and  to incorporate mitigation or payment of “fair share” of improvements.

Program
M‐2. Capital Improvement Plan
Continue  to  bi‐annually  update  the  City  of  Laguna  Hills  Six‐year  Capital  Improvement Program,  which  complies  with  the  requirements  of  Measure  M  and  the  Congestion Management  Program  (CMP).  The  Plan  identifies  and  recommends  funding  for  future improvements  to  the  mobility  system,  as  well  as  other  public  facilities,  including improvements to the existing pedestrian and bicycle network and landscaping right‐of‐ ways.

Policies  M‐1.3
Status  Ongoing
The Public Services Department continues to comply with the requirements of the  Congestion Management  Program as  part  of  the  City’s  bi‐annual  budget process.

Housing Element
Every California  city and  county is  required  to include a Housing Element in its General  Plan which establishes housing goals, policies, and programs that respond to community housing conditions and needs.    The  purpose  of  the  Laguna  Hills  Housing  Element  is  to  identify  housing  opportunities  and solutions specific to the housing issues of the City.

4.9.a
Packet Pg. 623 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 11 The 2013‐2021 Housing Element was adopted in October 2013.  The City received State Certification for its 2013‐2021 Housing Element in November 2013. In 2021, the City initiated the next update to the Housing Element for the planning period covering 2021‐2029.  The City is required to plan for 1,985 new housing units, and the update process is anticipated to conclude in 2022.

The following Housing goals and programs were implemented in 2021:
• Continuum of Care Funding and Consolidated Plan Participation The City continues to participate in the Orange County Consolidated Plan Programs and in the Orange  County  Continuum  of  Care  local  housing  process  to  facilitate  obtaining  funds  for affordable housing and related social services for special needs populations. • Section 8 Rental Assistance
The City continues  to cooperate with Orange County Housing Authority  (OCHA) and provide referral services and information to the City’s residents. • Annual Progress Reports
The City prepared a 2020 Annual Report on citywide housing programs as part of its annual General  Plan  review  and  distributed  the  annual  report  on  Housing  Implementation  to  the California Department of Housing and Community Development (HCD) in February 2021.

Note:  In addition to the information provided above, the status of the Housing Element and progress in its implementation are described in an attachment to this Annual Progress Report – Annual Element Progress Report ‐ Housing Element Implementation.

Conservation and Open Space
The purpose of  the Conservation and Open Space Element is  to identify natural, cultural, and open space resources, ensuring a high‐quality living environment for residents of Laguna Hills.  This Element provides goals, policies, and programs related to open space and conservation as well as a wide range of other topics that together comprise the natural setting of Laguna Hills, including biological, scenic, cultural, and historical resources.  The goals and policies contained in this element also address global climate  change  and  sustainable  practices  related  to  water  conservation,  energy  conservation,  air quality, and water quality.

Conservation and Open Space Element Background
Original Adoption Date  2009 (with Comprehensive General Plan Update) Previous Amendments  None
2021 Amendments None

4.9.a
Packet Pg. 624 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 12 Conservation and Open Space Element Implementation
Program
COS‐2 Adequate Water Supply
Implement applicable provisions in the Moulton Niguel and El Toro water districts’ Urban Water Master Plans and ensure that adequate water supplies are available to meet the needs of current and future growth, as well as during an emergency event or drought.

Support efforts by these agencies to research and employ new technologies that improve water services and/or sustainability of water supplies serving Laguna Hills.

Policies  COS‐1.2; CSF‐5.1, 5.2
Status  Ongoing
As part of both planning entitlement and building permit review processes, staff continues  to  coordinate  with  regional  water  service  providers  to  plan  for emergency water services and drought.

Program
COS‐‐7. Air Quality Management Plan
Work with the South Coast Air Quality Management District (SCAQMD) and the Southern California Association of Governments (SCAG) to implement the Air Quality Management Plan and meet all federal and State air quality standards for pollutants. Participate in any future  amendments  and  updates  to  the  Plan.  Implement,  review,  and  interpret  the General Plan and future discretionary projects in a manner consistent with the Air Quality Management  Plan  to  meet  standards  and  reduce  overall  emissions  from  mobile  and stationary sources.

Policies  COS‐3.2
Status  Ongoing
Through  the CEQA  review process, planning projects approved in 2021 were consistent  with  requirements  of  the  AQMD.    Staff  will  continue  to  monitor AQMD  and  SCAG  initiatives  regarding  reducing  air  pollutant  emissions  from mobile and stationary sources.

Noise
The purpose of the Noise Element is to identify and assess existing noise sources in the community, and to discuss the City’s role in ensuring comfortable and safe noise levels in the future.  As a part of the General Plan process, citizens and City officials identified goals for the future relating to balancing land  uses  in  the  City,  in  part  to  minimize  incompatibilities  and  exposure  to  excessive  noise  while providing the range of uses needed to maintain a high quality of life.  The goals, policies, and programs will assist in achieving noise compatibility between land uses.

4.9.a
Packet Pg. 625 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 13 Noise Element Background
Original Adoption Date  2009 (with Comprehensive General Plan Update) Previous Amendments  None
2021 Amendments None
Noise Element Implementation
Program
N‐4. Commercial Noise
Review the locations of proposed projects with the potential to generate noise in relation to sensitive receptors through the discretionary project review process. Limit delivery or service hours for stores and businesses with loading areas, docks, or trash bins that front, side, or gain access on driveways next to residential and other noise sensitive areas. Only approve exceptions if full compliance with the nighttime limits of the noise regulations is achieved.

Policies  N‐1.1, N‐1.2, N‐3.1, N‐3.2
Status  Ongoing
The City reviewed development proposals to ensure that the noise standards and compatibility criteria set forth in the Noise Element were met.  If necessary, conditions of approval were placed on discretionary permits to minimize noise impacts.

Program
N‐5. Construction Noise
Require all construction activity to comply with the limits (maximum noise levels, hours, and  days  of  allowed  activity)  established  in  City  noise  regulations  to  reduce  impacts associated with  temporary construction noise  to  the extent  feasible. Trucks associated with construction activities shall follow designated truck routes, where appropriate.

Policies  N‐3.1
Status  Ongoing
The  Community  Development  Department  and  the  Orange  County  Sheriff’s Department  continue  to  monitor  violation  or  complaints  of  the  City’s construction noise requirements.  The City reviewed development proposals to ensure that the noise standards and compatibility criteria set forth in the Noise Element were met.

4.9.a
Packet Pg. 626 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 14 Safety
The Safety Element establishes policies and programs to protect the community from risks associated with seismic, geologic, flood, and wildfire hazards.

The Safety Element is currently being updated, as is required when the Housing Element is updated.

The Safety Element update is not comprehensive in nature, in that it seeks only to incorporate new information  and  areas  of  analysis  required  by  state  laws  that  have  been  enacted  since  2009. The update process is anticipated to conclude in 2022.

Safety Element Background
Original Adoption Date  2009 (with Comprehensive General Plan Update) Previous Amendments  None
2021 Amendments None
Safety Element Implementation
Program
S‐2 Natural Hazards Risk Reduction
Reduce the risk to the community from hazards related to geologic conditions, seismic activity,  flooding,  and  structural  and  wildfires  by  requiring  feasible  mitigation  of  such impacts  on  discretionary  development  projects.  Assess  development  proposals  for potential  hazards  pursuant  to  CEQA.  Require  measures  to  mitigate  all  identified significant public safety hazards.

Policies  S‐1.2
Status  Ongoing
Through  the CEQA  review process, planning projects approved in 2021 were evaluated to reduce the risk of impacts from geologic and seismic hazards by applying  current  and  proper  land  use  planning,  development  engineering, building construction, and retrofitting requirements.

Program
S‐5. Orange County Fire Authority
Work  closely  with  the  Orange  County  Fire  Authority  (OCFA)  to  implement  fire  hazard education  and  fire  prevention  programs,  including  fuel  modification  programs  and controlled burns. Coordinate with OCFA  to ensure  that water pressure is adequate  for firefighting purposes in all areas of the City, particularly in redevelopment projects/areas.

Coordinate with OCFA  to implement  the Hazardous Materials Area Plan within Laguna Hills.

Policies  S‐5.1, 5.2, 5.3, 5.4

4.9.a
Packet Pg. 627 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 15 Status  Ongoing
Staff continues to coordinate with the Orange County Fire Authority for permit and  project  review  to  ensure  that  OCFA  requirements  are  being  met.    Staff continues to cooperate with the Orange County Integrated Waste Management Department to address hazardous materials.

Program
S‐9. Crime Prevention through Environmental Design (CPTED) Review  all  new  development  and  redevelopment  proposals  for  sensitivity  to  CPTED principles. Encourage incorporation of design features that employ adequate lighting and place  increased  emphasis  on  public  areas.  Coordinate  with  the  OCSD  to  develop guidelines on CPTED principles.

Policies  S‐4.1; LU‐3.12
Status  Ongoing
When feasible, staff has incorporated Crime Prevention through Environmental Design measures and “visible  spaces” into new developments as a means of promoting safe environments.  Lighting of public areas have been designed to meet  the  Municipal  Code  lighting  requirements,  while  providing  adequate lighting for the safety of the public.

Program
S‐12.  Project‐Related Flood Control and Stormwater Management and Comprehensive Drainage Studies
As  a  condition  of  project  approval,  require  new  development  and  redevelopment  to provide adequate  on‐site and  off‐site  storm water and  flood management  facilities  to control  direct  and  indirect  erosion  and  discharges  of  pollutants  and/or  sediments.  To determine the facility and Best Management Practices (BMP) needs, the City will require, when necessary, a hydrological/drainage analysis be performed by a state‐licensed and City‐approved engineer, with  the  cost  of  said analysis  the  responsibility  of  the  project applicant
Policies  S‐6.2; COS‐1.3
Status  Ongoing
All projects approved in 2021 were reviewed and accepted by the City Engineer.

Conditions  of  approval  were  implemented  regarding  Water  Quality Management Plan requirements and plan check review procedures.

Community Services and Facilities
The  purpose  of  the  Community  Services  and  Facilities  Element  is  to  assess  the  current  status  of community services as well as evaluate their long‐term provision to ensure that adequate services and facilities  are  both  planned  and  provided  proportionate  with  the  projected  growth,  as  well  as development and redevelopment, as it occurs within the City.  The Community Services and Facilities

4.9.a
Packet Pg. 628 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 16 Element also establishes the City’s plan to provide and maintain infrastructure and public services for future growth, without diminishing services to existing development.  Community services collectively refer  to  law  enforcement,  fire  protection,  water,  sewer,  solid  waste,  electricity  and  natural  gas, communication, and animal care services.  Community facilities collectively refer to schools, libraries, parks, and recreational facilities.

Community Services and Facilities Element Background
Original Adoption Date  2009 (with Comprehensive General Plan Update) Previous Amendments  None
2021 Amendments None
Community Services and Facilities Element Implementation Program
CSF‐4. Water and Sewer Services for New Development
Review  development  and  redevelopment  proposals  and  require  necessary  studies,  as appropriate, and water conservation and mitigation measures to ensure adequate water and sewer service.

Policies  CSF‐5.1, 5.2, 6.1, 6.2
Status  Ongoing
All development proposals reviewed and approved in 2021 have obtained or have  been  required  to  obtain  through  conditions  of  approval  all  required clearances from local water agencies.  Staff will continue to monitor and work closely with local and regional water suppliers and distributors to ensure that high‐quality water and sewer services is available for the community.

Program
CSF‐5. Solid Waste Services
Continue to contract for solid waste services from a private sector provider. Ensure that community needs for solid waste disposal are being met.

Policies  CSF‐7.1
Status  Ongoing
In 2021, staff made progress in establishing a review process and outreach to the  development  and  business  community  regarding  AB  1826  (Mandatory Commercial Organics Recycling), SB 1383 (Short‐Lived Climate Pollutants), and AB  341  (Mandatory  Commercial Recycling).  Staff will  continue  to work with local service providers to ensure adequate solid waste collection, disposal, and recycling services.

4.9.a
Packet Pg. 629 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) 17 CONCLUSION
This Annual Progress Report documents the City’s recent progress in updating and implementing the General Plan.  The information contained herein will be forwarded to the Governor’s Office of Planning and Research and  the Department of Housing and Community Development  to serve as  the City of Laguna Hills’ General Plan Annual Progress Report for calendar year 2021.

The Laguna Hills City Council reviewed and accepted the report on March 22, 2022.

4.9.a
Packet Pg. 630 Attachment: Attachment A - 2021 General Plan Annual Progress Report (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2021 (Jan. 1 - Dec. 31) Housing Element ImplementationPlanning Period 5th Cycle 10/15/2013 - 10/15/2021 Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Application Status Notes
2 34 6 7 8 9 11 12
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID+ Unit Category (SFA,SFD,2 to 4,5+,ADU,MH) Tenure R=Renter O=Owner Date Application Submitted+ (see instructions) Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low-Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Total PROPOSED Units by Project Total APPROVED Units by project Total DISAPPROVED Units by Project Was APPLICATION SUBMITTED Pursuant to GC 65913.4(b)? (SB 35 Streamlining) Was a Density Bonus requested for this housing development? Was a Density Bonus approved for this housing development? Please indicate the status of the application. Notes+ Summary Row: Start Data Entry Below 0 0 100 0 100 0 1300 1500 0 0 62122102 24155 LAGUNA HILLS
MALL
VILLAGE AT LAGUNA HILLS USE-0010-2019 5+ R 1/22/2021 100 100 1300 1500 No No N/A Pending Table A
Housing Development Applications Submitted
Cells in grey contain auto-calculation formulas
1 5
Project Identifier Unit Types Proposed Units - Affordability by Household Incomes (CCR Title 25 §6202)
Density Bonus Applications
10 4.9.b
Packet Pg. 631
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2021 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 5th Cycle 10/15/2013 - 10/15/2021
Table A2
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
Term of Affordability
or Deed Restriction Notes
23 56 89 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID+ Unit Category (SFA,SFD,2 to 4,5+,ADU,MH) Tenure R=Renter O=Owner Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low- Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Entitlement Date Approved # of Units issued Entitlements Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low- Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Building Permits Date Issued # of Units Issued Building Permits Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low- Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Certificates of Occupancy or other forms of readiness (see instructions) Date Issued # of Units issued Certificates of Occupancy or other forms of readiness How many of the units were Extremely Low Income?+ Was Project APPROVED using GC 65913.4(b)? (SB 35 Streamlining) Y/N Infill Units? Y/N+ Assistance Programs for Each Development (may select multiple - see instructions) Deed Restriction Type (may select multiple see instructions) For units affordable without financial assistance or deed restrictions, explain how the locality determined the units were affordable (see instructions) Term of Affordability or Deed Restriction (years) (if affordable in perpetuity enter 1000)+ Number of Demolished/Dest royed Units Demolished or Destroyed Units Demolished/Des troyed Units Owner or Renter Total Density Bonus Applied to the Project (Percentage Increase in Total Allowable Units or Total Maximum Allowable Residential Gross Floor Area) Number of Other Incentives, Concessions, Waivers, or Other Modifications Given to the Project (Excluding Parking Waivers or Parking Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Summary Row: Start Data Entry Below 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0000 0 2 2 00 00 62721105
25031

BUCKBOARD
LANE
SFD O
0 0 1 7/13/2021 1 N
62026217 24915 HENDON STREET ADU O 0 1 10/6/2021 1 0N62713201 25084 MUSTANG DRIVE ADU O 0 1 5/3/2021 1 0N 63617101 25199 STAGELINE DRIVE ADU O 0 0 1 6/23/2021 1 N Density Bonus
1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building Permits Affordability by Household Incomes - Certificates of Occupancy 4 7 10
Note: "+" indicates an optional field
Housing with Financial Assistance
and/or Deed Restrictions Project Identifier Demolished/Destroyed Units (CCR Title 25 §6202)

4.9.b
Packet Pg. 632
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2021 (Jan. 1 - Dec. 31) Housing Element ImplementationPlanning Period 5th Cycle 10/15/2013 - 10/15/2021 (CCR Title 25 §6202) 1 34
RHNA Allocation
by Income Level 2013 2014 2015 2016 2017 2018 2019 2020 2021 Total Units to Date (all years) Total Remaining RHNA by Income Level Deed Restricted - - - - - - - - - Non-Deed Restricted - - - - - - - - - Deed Restricted - - - - - - - - - Non-Deed Restricted - - - - - - - - - Deed Restricted - - - - - - - - - Non-Deed Restricted - - - 291 1 - - - - Above Moderate - - - - 1 1 - 2 5 2 11 -
2 - - - 292 2 - 2 5 2 303 2
Note: units serving extremely low-income households are included in the very low-income permitted units totals and must be reported as very low-income units.Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at [email protected]. -
-
This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs. 292
Moderate
1 1
-
Please contact HCD if your data is different than the material supplied here -
2 Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
1 1
Please note: For the last year of the 5th cycle, Table B will only include units that were permitted during the portion of the year that was in the 5th cycle. For the first year of the 6th cycle, Table B will include units that were permitted since the start of the planning period.Total RHNATotal Units Income Level
Very LowLow

4.9.b
Packet Pg. 633
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2021 (Jan. 1 - Dec. 31) Housing Element ImplementationPlanning Period 5th Cycle 10/15/2013 - 10/15/2021 Date of Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of Rezone Very Low-Income Low-Income Moderate-Income Above Moderate- Income Rezone Type Parcel Size (Acres) General Plan Designation Zoning Minimum Density Allowed Maximum Density Allowed Realistic Capacity Vacant/Nonvacant Description of Existing Uses Note: "+" indicates an optional fieldCells in grey contain auto-calculation formulas Summary Row: Start Data Entry Below
3 8
Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C
(CCR Title 25 §6202)

4.9.b
Packet Pg. 634
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills
Reporting Year 2021 (Jan. 1 - Dec. 31)
123 4
Name of Program Objective Timeframe in H.E Status of Program Implementation H-1. Code Enforcement
Program
Enforce building code regulations and
abate code violations, nuisances, and
existing uses, activities, buildings, or
structures that pose a threat to public
health, safety, or welfare. Enforcement
activities will focus on property
maintenance, such as eliminating
derelict or abandoned vehicles,
outdoor storage, or other situations
that may constitute health, safety, or
fire hazards.

Ongoing
With the goal of voluntary compliance, the City's Code Enforcement staff continues to monitor and address complaints related to property maintenance.

Staff investigated hundreds of complaints associated with housing or property maintenance and took appropritate steps to work with the property owner to resolve code violations, or referred unresponsive owners to the City Attorney's office for prosecution.

H-2. State Franchise Tax
Board Code Enforcement
To promote maintenance of existing
rental properties, the City shall work
with the California State Franchise Tax
Board to enforce provisions of
California Revenue and Taxation code
Sections 17274 and 24436.5, which
prohibit owners of substandard rental
housing from claiming depreciation,
amortization, mortgage interest, and
property tax deductions of state income
tax. The City will notify the State
Franchise Tax Board if substandard
rental housing is identified
Ongoing The City is not aware of any substandard housing within the community. If such housing is identified, the City will notify the State Franchise Tax Board.

H-3. Housing
Rehabilitation
The City will continue to work with the
Orange County Housing and
Community Services Department to
receive rehabilitation loans and grants
for low and moderate income
homeowners and rental property
owners, including senior/disabled
households, to maintain housing stock.

Efforts will focus on rehabilitating
approximately 148 units in the Aliso
Meadows Condominium Development.

The rehabilitation loan and grant
program will use CDBG funds
distributed by the County as
appropriate. The City will publicize the
availability of this program in local
newspapers, on the City’s website, at
the Community Development
Department, and in information items at
Planning Agency Public Hearings
Annually by September of
each year or as otherwise
required by the County
CDBG schedule
Due to staffing/resource limitations, the City did not participate in the CDBG program in FY 20/21. However, the City intends to apply to the County for CDBG funds to use in FY 22/23.

H-4. At-Risk Units
The City will continue to pursue the
extension of affordability controls for
51 units, either in the existing Rancho
Moulton housing development or as
part of new or redevelopment activities
in the Via Lomas area or other areas of
the City. . The City will annually prepare
a “Risk Assessment” report provided
by the California Housing Partnership
Corporation (CHPC). Projects
determined high risk are those most
likely to decline continued federal
assistance because they currently have
rents below market rate(s) and are
owned by profit-motivated entities. The
City will work with potential purchasers
to preserve 51 units in the existing
development or in new development by
finding an interested nonprofit entity
and securing funding to acquire and
preserve the property. The City will use
HCD resources listed on the HCD
website, as well as other resources, to
locate potential funding sources as
needed for the preservation of
affordable housing. As needed, the City
will work with tenants of at-risk units
and provide them with education
regarding tenant rights, notification
procedures, and conversion
procedures. The City will also provide
tenants in at-risk projects information
By January of each year.

In 2021, the city continued to monitor existing at-risk units in the City, and continued to refer prospective tenants to the County of Orange regarding Section 8 housing. In 2021, Rancho Moulton continued to participate in the County's Section 8 rental assistance program.

H-5. Foreclosure Referral
Program
Based on current dynamics, the City
seeks to address the increased
incidence of residents facing
foreclosure. The City will provide
foreclosure information on the City’s
website, and provide resources at the
City to refer residents to external
agencies to assist in reducing incidents
of foreclosures in Laguna Hills.
1/1/2014 As necessary, the City has been referring people to the County’s foreclosure websites, which provide a wealth of information regarding foreclosures.

Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.

Table D
Program Implementation Status pursuant to GC Section 65583

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
(CCR Title 25 §6202)

4.9.b
Packet Pg. 635 Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) H-6. Urban Village
Specific Plan Area for
Housing Opportunities
The City shall inform existing property
owners and prospective developers
that housing opportunities are available
in the Urban Village Specific Plan area.

Housing opportunities include market
rate housing units and could also
include housing for low and moderate
income households, families, seniors,
and special needs households. City
staff will inform prospective developers
at time of project application
meeting(s). Additionally, the City will
promote the UVSP area on the City’s
website and will also promote housing
development incentives consistent with
Chapter 9-72 of the Zoning Ordinance.

Ongoing
The City has met with multiple developers interested in development within the UVSP that may incorporate housing. Staff referred the developers to a variety of development regulations and density bonus provisions.

H-7. Alicia Gateway for
Housing Opportunities
The City shall inform existing property
owners and prospective developers
that housing opportunities are available
in the Alicia Gateway. Housing
opportunities could include market rate
housing units and could also include
housing for low and moderate income
households, families, seniors and
special needs households. City staff
will inform prospective developers at
time of project application meeting(s).

Additionally, the City will promote Alicia
Gateway on the City’s website and will
also promote housing development
incentives consistent with Chapter 9-72
of the Zoning Ordinance.
12/1/2013
During 2021 the city met with multiple developers interested in development within the Alicia Gateway that may incorporate housing. Staff referred the developers to a variety of development regulations and density bonus provisions.

H-8. Zoning Ordinance
Update
The implementation of housing goals,
policies, and programs will require
updating the City’s Zoning Ordinance.

In addition, certain City rules and
regulations may constrain the
development of housing affordable to
low and moderate income households
with special needs. To mitigate
potential constraints and implement
housing goals, policies, and programs,
the City will update the following
regulations in the Zoning Ordinance: 1.

Consolidate and remove duplicitous
definitions of manufactured housing
and mobile homes and ensure
consistency in the Zoning Ordinance,
use regulations, and development
standards. 2. Reduce the open space
requirement in the High Density
Residential district; 3. Increase the
maximum lot coverage requirement in
the Mixed Use district. 4. Transitional
and supportive housing will be
permitted as a residential use and only
subject to those restrictions that apply
to other residential dwellings of the
same type in the same zone.
10/1/2014
Due to staffing/resource limitations, staff has been able to complete numbers 1 and 4, and will be considering addressing numbers 2 and 3 in the next budget cycle (FY 22/23, 23/24)
H-9. Second Units
The City shall continue to implement
the Second Unit provisions of the
Zoning Ordinance consistent with state
law. The City will continue to permit
second units by right in all residential
zones of the City, requiring only
ministerial approval. Residential
second units provide a viable option for
providing additional housing
opportunities which could include
affordable housing for lower income
seniors, single persons, or small
households within existing
neighborhoods.

Ongoing
The City has updated the Second Unit provisions to comply with 2018 State Accessory Dwelling Unit regulations. A new Code amendment is pending to be compliant with more recent legislation. Staff will continue to monitor any future updates to ADU law.

H-10. CDBG Funding for
Shelter for the Homeless
The City shall apply for United States
Department of Housing and Urban
Development CDBG funds and allocate
a portion of such funds to
subrecipients who provide shelter for
the homeless.

Annually by September of
each year or as otherwise
required by the County
CDBG schedule
The City of Laguna Hills is a non-entitlement city and therefore relies on the County of Orange to receive and administer CDBG funding on the City's behalf.

As in previous years, in 2021 the City relied on the County of Orange to coordinate a comprehensive regional Continuum of Care (CoC) strategy that includes the participation of all thirty-four cities in Orange County, County Agencies, the County’s homeless housing and service providers, and other community groups (including non-profits, local governmental agencies, faithbased organizations, the homeless and formerly homeless, interested business leaders, schools, and many other stakeholders) to identify the gaps and unmet needs of the County’s homeless. Through cooperative agreements between the City and the County, the County has pursued funding for housing and related social services for the City's homeless population.

4.9.b
Packet Pg. 636 Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) H-11. Continuum of Care
Funding and
Consolidated Plan
Participation
The City shall continue to participate in
the Orange County Consolidated Plan
Programs and in the Orange County
Continuum of Care local housing
planning process to facilitate obtaining
funds for affordable housing and
related social services for special
needs populations. The Continuum of
Care local housing and service delivery
system focuses on homeless
prevention, outreach, and assessment,
emergency shelters, transitional
housing, supportive services, and
permanent supportive housing for
homeless individuals and families. The
City shall pursue homeless assistance
grants through the Continuum. The City
will assist public and private nonprofit
housing developers in preparation of
funding applications for special needs
populations.

Annually by September of
each year or as otherwise
required by the County
CDBG schedule
The City of Laguna Hills is a non-entitlement city and therefore relies on the County of Orange to receive and administer CDBG funding on the City's behalf.

As in previous years, in 2021 the City relied on the County of Orange to coordinate a comprehensive regional Continuum of Care (CoC) strategy that includes the participation of all thirty-four cities in Orange County, County Agencies, the County’s homeless housing and service providers, and other community groups (including non-profits, local governmental agencies, faithbased organizations, the homeless and formerly homeless, interested business leaders, schools, and many other stakeholders) to identify the gaps and unmet needs of the County’s homeless. Through cooperative agreements between the City and the County, the County has pursued funding for housing and related social services for the City's special needs population.

H-12. Section 8 Rental
Assistance
The Orange County Housing Authority
currently administers the Section 8
Rental Assistance program on behalf of
the City. Currently the program assists
renter households in the City of Laguna
Hills. Based on future congressional
appropriations, the County Housing
Authority will apply for additional
funding which will enable the Housing
Authority to administer additional
vouchers for families, seniors, and
disabled persons over the Housing
Element planning period. The City of
Laguna Hills will continue to provide
referral services and information to the
City’s residents.

Ongoing In 2021 the City continued to refer interested residents to the Orange County Housing Authority.

H-13. Affordable Housing
Developer Partnerships
The City will continue to develop
partnerships with mainstream and/or
special needs affordable housing
developers that could result in setasides in existing and planned low income housing projects. These
partnerships may include incentives
(such as expedited processing, fee
waivers, and density bonuses) provided
by the City to facilitate the set-asides
for planned low income units and
actively cooperating with the owners of
existing units to secure appropriate
federal funding necessary to maintain
existing affordability. The City will
promote lower income housing
development incentives on the City’s
website, consistent with Chapter 9-72
of the Zoning Ordinance. The City will
use HCD’s housing resources website
to locate available sites and potential
funding sources as needed for the
development of affordable housing.

Ongoing
In 2021 the city met with multiple developers interested in development within the City that might incorporate affordable housing into their projects. Staff referred the developers to a variety of development regulations and density bonus provisions.

H-14. Fair Housing
Program
The City will continue to maintain
services and personnel to receive
housing complaints and continue to
address or resolve complaints. The City
will also continue to refer fair housing
complaints to the Fair Housing Council
if they cannot be resolved at the City
level. The City will also continue to
disseminate written literature about fair
housing laws, resident rights, and
remedies for fair housing complaints
The City will ensure that fair housing
literature is available in the Community
Development Department, on the City’s
website, and at the Laguna Hills
Technology Library. The City will
monitor these sites to ensure timely,
accurate information is available.

Ongoing
In 2021, city staff continued to monitor and respond to housing complaints, and refered residents to various agencies that provide fair housing services in Orange County.

4.9.b
Packet Pg. 637 Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) H-15. Universal Design
Features in Housing
The City recognizes that all people have
varying abilities and that many people
will encounter temporary or permanent
changes in ability to conduct the tasks
necessary for daily living throughout
their lives. Universal design features
create housing suited for people of all
abilities and can allow residents to stay
in their homes over their lifetime. The
City will explore programs, an
ordinance, and incentives to encourage
provision of universal design features
in housing. The City will refer to the
HCD website for guidelines and a
model ordinance consistent with the
principles of universal design. The
universal design ordinance will
address such topics as findings,
definitions, scope and application,
standards, and enforcement. City staff
will encourage prospective developers
to provide universal design features at
the time of project application
meeting(s).
10/1/2014 Staff will continue to explore programs and incentives related to universal design in housing.

H-16. Annual Progress
Reports
The City will report annually on
progress toward implementation of the
Housing Element and residential
development activities citywide.

Prepare an annual report
for submittal to HCD by
April 1 of each year in the
planning period
The APR for 2021 is scheduled to be received by the City Council on March 22, 2022. If approved, it will be transmitted to HCD as directed by Government Code Section 65400.

H-17. Housing Issues
Monitoring
The City will monitor existing and
proposed affordable housing
developments in the City. The City will
also monitor legislation, trends, and
policy issues related to the
development and maintenance of
affordable housing in Laguna Hills.

Ongoing
In 2021 staff continued to monitor existing and proposed affordable housing developments in the City, as well as legislation, trends, and policy issues related to the development and maintenance of affordable housing.

H-20. Local Housing
Efforts Coordination
The City shall coordinate local housing
efforts with appropriate federal, state,
regional, and local government and/or
agencies and cooperate in
implementation of intergovernmental
housing programs to ensure maximum
effectiveness in solving local and
regional housing problems. The City
will submit CDBG applications to assist
in preserving existing affordable
housing stock.
12/1/2009
Due to staffing/resource limitations, the City has not continuously participated in the CDBG program. However, the City intends to apply to the County for CDBG funds to use for FY 22/23.

4.9.b
Packet Pg. 638 Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2021 (Jan. 1 - Dec. 31) Housing Element ImplementationPlanning Period 5th Cycle 10/15/2013 - 10/15/2021 Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
34 APN Street Address Project Name+ Local Jurisdiction Tracking ID+ Very Low Income Low Income Moderate Income Above Moderate Income Description of Commercial Development Bonus Commercial Development Bonus Date Approved Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
Annual Progress Report January 2020

4.9.b
Packet Pg. 639
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2021 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulasPlanning Period 5th Cycle 10/15/2013 - 10/15/2021 (CCR Title 25 §6202) Extremely LowIncome+ Very Low-Income+ Low-Income+ TOTAL UNITS+ Extremely Low- Income+ Very Low- Income+ Low-Income+ TOTAL UNITS+ Rehabilitation ActivityPreservation of Units At-RiskAcquisition of UnitsMobilehome Park PreservationTotal Units by Income Table F
Please note this table is optional: The jurisdiction can use this table to report units that have been substantially rehabilitated, converted from non-affordable to affordable by acquisition, and preserved, including mobilehome park preservation, consistent with the standards set forth in Government Code section 65583.1, subdivision (c). Please note, motel, hotel, hostel rooms or other structures that are converted from non-residential to residential units pursuant to Government Code section 65583.1(c)(1)(D) are considered net-new housing units and must be reported in Table A2 and not reported in Table F.

Activity Type
Units that Do Not Count Towards RHNA+
Listed for Informational Purposes Only
Units that Count Towards RHNA +
Note - Because the statutory requirements severely limit what can be counted, please contact HCD to receive the password that will enable you to populate these fields. The description should adequately document how each unit complies with subsection (c) of Government Code Section 65583.1+
Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c) Annual Progress Report January 2020

4.9.b
Packet Pg. 640
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills
Reporting Period 2021 (Jan. 1 - Dec. 31)Planning Period 5th Cycle 10/15/2013 - 10/15/2021 ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation
23 4
APN Street Address Project Name+ Local Jurisdiction Tracking ID+ Realistic Capacity Identified in the Housing Element Entity to whom the site transferred Intended Use for Site 1 Summary Row: Start Data Entry Below
Note: "+" indicates an optional fieldCells in grey contain auto-calculation formulas (CCR Title 25 §6202)
Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of Project Identifier
NOTE: This table must only be filled out if the housing element sites inventory contains a site which is or was owned by the reporting jurisdiction, and has been sold, leased, or otherwise disposed of during the reporting year.

4.9.b
Packet Pg. 641
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills
Note: "+" indicates an optional field
Reporting Period 2021
(Jan. 1 - Dec.
31)
Cells in grey contain autocalculation formulas
Designation Size Notes
1 2 34 5 6 7
APN Street Address/Intersection Existing Use Number of Units Surplus Designation Parcel Size (in acres) Notes Summary Row: Start Data Entry Below
Parcel Identifier

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
(CCR Title 25 §6202)
Table H
Locally Owned Surplus Sites

4.9.b
Packet Pg. 642
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills
Reporting Year 2021 (Jan. 1 - Dec. 31)
Planning Period 5th Cycle 10/15/2013 - 10/15/2021
Current Year
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
2 2
Units by Structure Type Entitled Permitted Completed
SFA 0 0 0
SFD 0 0 1
2 to 4 0 0 0
5+ 0 0 0
ADU 0 2 1
MH 0 0 0
Total 0 2 2
1 1,500
0 0
0 0
0 0
Income Rental Ownership Total
Very Low 0 00
Low 0 00
Moderate 0 00
Above Moderate 0 00
Total 0 00
Cells in grey contain auto-calculation formulas
Units Constructed - SB 35 Streamlining Permits
Number of Streamlining Applications Approved
Total Developments Approved with Streamlining
Total Units Constructed with Streamlining
Total Housing Applications Submitted:

Number of Proposed Units in All Applications Received:

Total Housing Units Approved:

Total Housing Units Disapproved:

Total Units
Housing Applications Summary
Use of SB 35 Streamlining Provisions
Note: Units serving extremely low-income households are included in the very low-income permitted units totals Number of Applications for Streamlining
Building Permits Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate

4.9.b
Packet Pg. 643 Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) Jurisdiction Laguna Hills
Reporting Year 2021 (Jan. 1 - Dec. 31)
Total Award Amount Total award amount is auto‐populated based on amounts entered in rows 15‐26.

Task $ Amount Awarded $ Cumulative Reimbursement Requested Other Funding Notes Summary of entitlements, building permits, and certificates of occupancy (auto‐populated from Table A2) Current Year
Deed Restricted 0Non-Deed Restricted 0Deed Restricted 0Non-Deed Restricted 0Deed Restricted 0Non-Deed Restricted 0 00 Current Year
Deed Restricted 0Non-Deed Restricted 0Deed Restricted 0Non-Deed Restricted 0Deed Restricted 0Non-Deed Restricted 0 22 Current Year
Deed Restricted 0Non-Deed Restricted 0Deed Restricted 0Non-Deed Restricted 0Deed Restricted 0Non-Deed Restricted 0 22 ANNUAL ELEMENT PROGRESS REPORT
Local Early Action Planning (LEAP) Reporting
(CCR Title 25 §6202)
Please update the status of the proposed uses listed in the entity’s application for funding and the corresponding impact on housing within the region or jurisdiction, as applicable, categorized based on the eligible uses specified in Section 50515.02 or 50515.03, as applicable.
$                                                               ‐ Task Status
Total Units
Certificate of Occupancy Issued by Affordability Summary Income Level
Very Low
Low
Moderate
Above Moderate
Moderate
Above Moderate
Total Units
Completed Entitlement Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate
Total Units
Building Permits Issued by Affordability Summary
Income Level
Very Low
Low

4.9.b
Packet Pg. 644
Attachment: Attachment B - HCD FORM (2778 : 2021 General Plan Annual Progress Report) City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 22, 2022
TO: Mayor and Council Members
FROM: Kenneth H. Rosenfield P.E.

Interim City Manager/Director of Public Services
ISSUE: Progress Payment No. 4 for Citywide Pavement Rehabilitation, CIP No. 101-L & Ridge Route Drive Pavement Resurfacing, CIP No. 188 RECOMMENDATION: That the City Council approve Progress Payment No. 4, in the net amount of $623,861.67, to Petrochem Materials Innovation, LLC, for Citywide Pavement Rehabilitation, CIP No. 101-L & Ridge Route Drive Pavement Resurfacing, CIP No. 188.

SUMMARY:

Work on the Citywide Pavement Rehabilitation CIP No. 101-L & Ridge Route Drive Pavement Resurfacing, CIP No. 188, began on September 7, 2021, and is being performed by Petrochem Materials Innovation, LLC. Work performed in January included application of asphalt concrete overlay, cold planing, raising valves and manholes to grade, and striping. The contractor has submitted the fourth progress payment request for approval.

BACKGROUND:

A routine monthly action for capital improvement projects is the submission, review, and approval of the contractor’s invoice. Procedurally, field staff verifies the contractor’s quantities and matches them with the submitted invoice. The unit prices and total costs of the project are confirmed by the office staff and a progress payment is then processed. A five-percent (5%) retention is withheld from each payment to assure final performance of the work. The contractor for this project, Petrochem Materials

4.10 Packet Pg. 645
Progress Payment No. 4 for Citywide Pavement Rehabilitation, CIP No. 101-L & CIP 188 March 22, 2022

Page 2 ends

Innovation, LLC., has submitted the fourth progress payment for the subject project as follows:

ITEM # DESCRIPTION QUANTITY UNIT UNIT PRICE $ AMOUNT
BASE BID 1: CITYWIDE PAVEMENT REHABILITATION, CIP NO. 101-l 5 Striping, Including Raised
Pavement Markers, Lane Lines,
Legends and Cross Walks

0.25 LS $24,247.00 $6,061.75
BASE BID 2: RIDGE ROUTE DRIVE PAVEMENT RESURFACING, CIP NO. 188 1 Clearing and Grubbing 0.5 LS $26,350.00 $13,175.00
3 1”AC Cold Plane 219,370.00 SF $0.18 $39,486.60
4 1.5” AC Overlay including
Cracksealing 2,225.46 TN $84.00 $186,938.64
5 Adjust Gas Valve to Grade 6 EA $500.00 $3,000.00
6 Adjust Water Valve to Grade 26 EA $500.00 $13,000.00
7 Adjust Manhole to Grade 8 EA $1,000.00 $8,000.00
8 Traffic Loops 4 EA $1,275.00 $5,100.00
9 Striping 0.5 LS $13,780.00 $6,890.00
ALTERNATE BID 1: MILL CREEK DRIVE
1 Clearing and Grubbing 0.5 LS $40,508.00 $20,254.00
3 6’ Wide cold planing/edge grind
along gutters and 15’ wide
transverse cold planing at four join
locations
159,591.00 SF $0.34 $54,260.94
4 1.5” AC Overlay including
Cracksealing 2,584.74 TN $94.00 $242,965.56
5 Raise Manhole to Grade 21 EA $1,120.00 $23,520.00
6 Raise Water Valve to Grade 51 EA $560.00 $28,560.00
8 Traffic Loops 4 EA $1,371.00 $5,484.00
TOTAL TO DATE $2,599,942.59
LESS PRIOR BILLING $1,943,246.10
TOTAL THIS PERIOD $656,696.49 $656,696.49
LESS 5% RETENTION $(32,834.82)
DUE $623,861.67
FISCAL IMPACT:

The progress payment is within the Capital Improvement Program Budget for Citywide Pavement Rehabilitation CIP No. 101-L & Ridge Route Drive Pavement Resurfacing, CIP No. 188.

4.10 Packet Pg. 646
City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 22, 2022
TO: Mayor and Council Members
FROM: Dan Meehan
Community Services Superintendent
ISSUE: April 2022 Rooted Campaign Event and Arbor Day Recognition RECOMMENDATION: That the City Council receive and file the report, and authorize the Mayor to sign the attached Arbor Day Proclamation as required by the Arbor Day Foundation for the Tree City USA Certification.

SUMMARY:

A work program in the current 2021-2023 Biennial Budget is to: “Host a quarterly Rooted Volunteer Campaign event to help beautify and make improvements within the City.” Three events have already occurred this fiscal year, all of which are described in more detail below:

1. September 4, 2021: Planting at La Paz and Aliso Hills. A total of 350 plants installed by 35 community volunteers.

2. November 13, 2021: Painting project of fences at Beckenham Park, with a total of 28 community volunteers.

3. February 19, 2022: Planting along La Paz Rd between McIntyre and Rickenbacker.

A total of 450 plants installed by 45 community volunteers.

The next quarterly Rooted Volunteer Campaign event is scheduled for Saturday, April 16th, beginning at 9:00 am. The event will take place at Costeau Park and include the planting of approximately 20 trees in recognition of Arbor Day, which is required for the City’s Tree City USA certification. A combined total of approximately 200 shrubs and

4.11 Packet Pg. 647
April 2022 Rooted Campaign Event and Arbor Day Recognition March 22, 2022

Page 2 ends

groundcover will also be planted during this event. In order to retain its designation as a Tree City USA, the attached proclamation must be signed by the Mayor.

FISCAL IMPACT:

The Fiscal Year 2021/22 budget for Rooted Volunteer Campaign is $8,000 to host four (4) quarterly events. The total cost of the three Rooted events already held this fiscal year is $7,385. This includes the donated plants by Nieves Landscape, Inc., per the Agreement with the City.

Staff estimates event expenditures for the April 16, 2022, event to be $4,000, for a total estimated cost of $11,385 for this fiscal year’s Rooted Volunteer Campaign event series.

The additional cost incurred will be absorbed into the Community Services Department’s budget.

ATTACHMENTS:
• Arbor Day Proclamation 2022

4.11 Packet Pg. 648

PROCLAMATION

ARBOR DAY
APRIL 16, 2022
WHEREAS, in 1872 J. Sterling Morton proposed to the Nebraska Board of Agriculture that a special day be set aside for the planting of trees; and WHEREAS, this holiday, called Arbor Day was first observed with the planting of more than a million trees in Nebraska; and
WHEREAS, Arbor Day is now observed throughout the nation and the world; and WHEREAS, trees can reduce the erosion of our precious topsoil by wind and water, cut heating and cooling costs, moderate the temperature, clean the air, produce life-giving oxygen, and provide habitat for wildlife; and
WHEREAS, trees are a renewable resource giving us paper, wood for our homes, fuel for our fires, and countless other wood products; and
WHEREAS, trees in our city increase property values, enhance the economic vitality of business areas, and beautify our community; and
WHEREAS, trees, wherever they are planted, are a source of joy and spiritual renewal.

NOW, THEREFORE, I, Dave Wheeler, Mayor, on behalf of the City Council of the City of Laguna Hills, California, do hereby proclaim April 16, 2022, as Arbor Day in the City of Laguna Hills.

Dated this 22nd day of March 2022.

DAVE WHEELER, MAYOR

4.11.a
Packet Pg. 649 Attachment: Arbor Day Proclamation 2022 (2785 : April 2022 Rooted Campaign Event and Arbor Day Recognition) City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 22, 2022
TO: Mayor and Council Members
FROM: Gregory E. Simonian
City Attorney
ISSUE: City Manager Recruitment - Appointment of Labor Negotiator RECOMMENDATION: That the City Council appoint Mayor Pro Tempore Heft to serve as the Council-designated Labor Negotiator for purposes of facilitating the employment contract negotiation process necessary to retain a new City Manager following completion of the pending formal competitive selection process.

SUMMARY:

On March 10, 2022, Interim City Manager Kenneth H. Rosenfield, P.E., submitted a letter of resignation indicating his intent to retire from the City, effective April 1, 2022, after nearly 27-years of dedicated public service. During his tenure with the City, he has served as the City's first Public Services Director/City Engineer and serving as the Interim City Manager for the past 14-months. Mr. Rosenfield's letter of resignation was placed on the March 22, 2022 agenda for City Council review and acceptance. In preparation for selecting a new city manager, a process already initiated by the City Council, it is recommended that the City Council, pursuant to Government Code §54957.6, appoint Mayor Pro Tempore Heft to serve as the Council-designated Labor Negotiator for purposes of facilitating upcoming employment contract negotiations in connection with the ongoing city manager recruitment process.

BACKGROUND:

This item is related to the pending formal competitive selection process for filling the city manager position and has been placed on the agenda at the recommendation of the City Attorney. In preparation for selecting a new city manager, a process already

4.12 Packet Pg. 650
City Manager Recruitment - Appointment of Labor Negotiator March 22, 2022

Page 2 ends

initiated by the City Council, it is recommended that the City Council, pursuant to Government Code Section 54957.6, select and appoint an individual(s) to serve as its designated representative(s) for purposes of conducting closed session meetings with its authorized labor negotiator to discuss compensation of the city manager, an unrepresented employee position. On March 10, 2022, Interim City Manager Kenneth H.

Rosenfield, P.E., submitted a letter of resignation indicating his intent to retire from the City, effective April 1, 2022, after nearly 27-years of dedicated public service. During his tenure with the City, he has served as the City's first Public Services Director/City Engineer and as the Interim City Manager for the past 14-months. Mr. Rosenfield's letter of resignation was placed on the March 22, 2022, agenda for City Council review and acceptance.

As a practical matter, a city council designated Labor Negotiator appointed to facilitate executive employment contract negotiations can be a city council member(s), human relations personnel, professional labor facilitator, an executive recruiter, or the city attorney. Over the years, the City Council has often appointed the Mayor Pro Tempore to fulfill this role – delegating such responsibilities to the Mayor Pro Tempore – to serve as the Council-designated Labor Negotiator in connection with city manager performance evaluations, labor negotiations, and employment contract related issues.

Government Code Section 54957.6 allows the City Council to select and identify its designated representative for purposes of conducting closed session meetings with its authorized Labor Negotiator to discuss compensation of the city manager, an unrepresented employee position. To do so, however, the City Council must first place the designation of a labor negotiator on the open and public session of the agenda and identify its designated Labor Negotiator prior to discussing compensation of an unrepresented employee in closed session.

Under the Brown Act, however, the City Council must take “final action” on the proposed compensation concerning employment of the city manager in open session after meeting and conferring with the council's designated Labor Negotiator. Following completion of the City Council’s ongoing formal competitive process for selecting a new city manager, it is anticipated that the City Council will direct the City Attorney to prepare a new employment agreement, which will be placed on the agenda for a future regular meeting of the City Council, at which time the Council will review and consider approval of the employment contract in open session
CONCLUSION:

4.12 Packet Pg. 651
City Manager Recruitment - Appointment of Labor Negotiator March 22, 2022

Page 3 ends

The City Council has the option of designating an authorized Council Labor Negotiator for purposes of facilitating the city manager employment contract negotiation process, but is not legally required to do so. It is recommended that the City Council, pursuant to Government Code §54957.6, appoint the Mayor Pro Tempore as the Council-designated Labor Negotiator for purposes of facilitating the contract negotiation process in connection with filling the city manager position.

FISCAL IMPACT:

There is no fiscal impact associated with the City Council designating one of its members to serve as the designated Labor Negotiator for purposes of facilitating the employment contract negotiation process for filling the city manager position.

4.12 Packet Pg. 652
City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 22, 2022
TO: Chair and Agency Members
FROM: Larry Longenecker
Community Development Director
ISSUE: Site Development Permit (SDP) No. USE-0027-2020 and Joint Parking Use Permit (PUP) No. USE-0084-2022, a Request by GB Architecture on Behalf of Warmington Properties, Inc. for Architectural and Site Upgrades and to Establish Joint Use Parking Facilities at Honali Plaza, Located at 24721 – 24781 Alicia Parkway.

RECOMMENDATION: That the Planning Agency:
1) Conduct a public hearing;
2) Find and determine that the project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of Title 14, Chapter 3 of the California Code of Regulations (Class 1, Existing Facilities); 3) Adopt a Resolution entitled: “A Resolution of the Planning Agency of the City of Laguna Hills, California, approving Site Development Permit (SDP) No. USE-0027-2020, a Request by GB Architecture on behalf of Warmington Properties, Inc. for Architectural and Site Upgrades to Honali Plaza, Located at 24721 - 24781 Alicia Parkway, including an exemption from the California Environmental Quality Act (CEQA) per CEQA Guidelines Section 15301 of Title 14, Chapter 3 of the California Code of Regulations (Class 1, Existing Facilities)”;
4) Adopt a Resolution entitled: “A Resolution of the Planning Agency of the City of Laguna Hills, California, approving Joint Parking Use Permit (PUP) No. USE-0084-2022, a Request by GB Architecture on behalf of Warmington Properties, Inc. to Establish Joint Use Parking Facilities at Honali Plaza, Located at 24721 - 24781 Alicia Parkway, including an exemption from the California Environmental Quality Act (CEQA) per

5.5.1 Packet Pg. 653
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 2 ends

CEQA Guidelines Section 15301 of Title 14, Chapter 3 of the California Code of Regulations (Class 1, Existing Facilities)”.

SUMMARY:

GB Architecture, on behalf of Warmington Properties, Inc. (“Applicant”) is requesting approval of the following applications for Honali Plaza (“Center”):
• A Site Development Permit (SDP) for a variety of site and architectural improvements to the Center, including a comprehensive building façade upgrade, a new courtyard/outdoor experience area, and renovated landscaping; and, • A Joint Parking Use Permit (PUP) to establish shared parking for the Center.

The Center is owned by Warmington Properties, Inc., which has authorized the Applicant to apply for the requested Site Development Permit and Joint Parking Use Permit (“Project”).

The Project includes façade upgrades to all six buildings in the Center and does not result in any change to the footprints/square footage of the buildings. The proposed upgrades to the building elevations have been designed to reflect a ‘Contemporary Transitional’ architectural theme. All rooftop mechanical equipment will be screened.

The Project also includes the creation of a new plaza/courtyard area, and would include seating, a children’s play area, and shade structures. Other site improvements include new and upgraded trash enclosures, upgraded landscaping, and new parking lot lighting.

Additionally, the Project also includes new pedestrian pathways that provide connections from existing public sidewalks into the Center. A new gate and crosswalk are also proposed, which will provide access to the Aliso Creek Bikeway. The Project also includes multiple improvements and extensions to existing perimeter walls, which will benefit the neighboring community by providing additional screening and security.

The Project will add twenty-two (22) parking stalls to the parking inventory, resulting in a total of 388 parking stalls (including 20 ADA-accessible stalls) that will be shared by tenants and visitors. Based on the parking requirements identified in the Laguna Hills Municipal Code, at full tenant occupancy, the Center would require 422 parking stalls, resulting in a deficit of 34 stalls. The Applicant prepared a parking study which concludes that utilizing a shared parking approach results in an actual peak parking

5.5.1 Packet Pg. 654
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 3 ends

demand of 363 parking stalls. Shared parking allows multiple uses within a shopping center to share parking stalls to meet parking demand, assuming those uses have staggered parking demand periods throughout the day. When factoring in the existing vacancies and including a 10% buffer, the result is a surplus of 25 parking stalls.

The Project complies with all requirements of the General Plan Land Use Element and Zoning Code. Table LU-1 of the General Plan and Section 9-29.010 of the Zoning Code identify the purpose and intent of land uses within the Neighborhood Mixed Use designation, which include the creation of attractive neighborhood-level centers that promote a more active, vibrant street life; increase pedestrian activity and reduce vehicular traffic; provide storefront style shopping streets; and/or encourage walking and social interaction. The Project is consistent with and enhances these objectives.

This Project is categorically exempt from CEQA pursuant to Section 15301 of Title 14, Chapter 3 of the California Code of Regulations (Class 1, Existing Facilities). In addition, staff has determined that the Project, subject to conditions of approval, will not result in any significant adverse impacts to the public, health, safety and general welfare. The design of the Project will provide a compatible land use within the Neighborhood Mixed Use zoning district and will expand the types of facilities and services available within the community. As conditioned, the Project will be a pleasant upgrade to Honali Plaza as the Center continues to provide a mix of retail uses and services.

Therefore, staff recommends approval of the Project, subject to the conditions of approval contained within the proposed Resolutions (Attachments A and B).

AUTHORITY:

Title 9 of the Laguna Hills Municipal Code (“LHMC”) contains the City of Laguna Hills Development Code (also commonly referred to as the “Zoning Code” or the “Code”).

The process the City must follow in reviewing new development projects is found in Chapter 9-92 of the Code. Section 9-92.080 of the Code grants the Community Development Director the authority to review and approve SDPs for commercial properties with development not exceeding 20,000 square feet. However, the proposed SDP is being considered in conjunction with a request for a PUP, which grants the Planning Agency the authority to review and approve (LHMC 9-92.030).

The process the City must follow in reviewing a Joint Parking Use Permit is found in LHMC Chapter 9-44 Access and Parking, and LHMC Chapter 9-92 Application Process and

5.5.1 Packet Pg. 655
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 4 ends

Submittal Requirements. LHMC Section 9-44.070 (Joint Use of Parking Facilities) describes how the sharing of parking facilities can be approved, as long as there is sufficient parking for all existing and proposed uses within a site. The Planning Agency has review authority over the PUP process in accordance with LHMC Section 9-92.030.

The findings required for the aforementioned application types are found in Section 9-92.080 of the Code and are listed and discussed in the attached Resolutions.

Staff has prepared findings demonstrating the applications comply with the Zoning Code and the General Plan as stated in the proposed Resolutions of Approval for the Site Development Permit (Attachment A) and Joint Parking Use Permit (Attachment B).

BACKGROUND:

Honali Plaza is an approximately 8-acre commercial retail center located on the northwest corner of Alicia Parkway and Hon Avenue in the Neighborhood-Mixed Use (NMU) zoning district. The Center was originally approved by the County of Orange and constructed in the late-1970s under the County’s jurisdiction (UP79-8P, SP79-5P, VA79- 1P). The Center’s site layout has remained unchanged from its original approval, and the property maintains coordinated circulation, parking, and landscaping.

The Center includes six multi-tenant buildings and a Wendy’s drive-thru restaurant pad on a separate parcel, with a combined total of approximately 72,202 square feet of retail space divided between 27 tenant spaces. The uses in the Center currently consist of a mix of retail, restaurants, and services uses. An approximately 27,000 square foot ‘Major Tenant’ space (Building A), formerly the location of Performance Bicycle, is currently vacant. However, a veterinary clinic is interested in leasing approximately 2/3 of the space, and has indicated to staff that they will apply for a Conditional Use Permit soon. The Chevron service station and Alicia Auto Spa carwash on the corner of Alicia Parkway and Hon Avenue are not a part of the Center or Project.

The surrounding area consists of existing single-family homes and the Alicia Parkway I-5 exit to the north, existing single-family homes to the west, and existing commercial retail/office centers to the south and east across Hon Avenue and Alicia Parkway. Figure 1 below is a vicinity map of the Project:

5.5.1 Packet Pg. 656
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 5 ends

Figure 1 - Vicinity Map
PROPOSAL & ANALYSIS:

The Applicant is requesting approval of a Site Development Permit for a variety of site/building upgrades and a Parking Use Permit to establish shared parking for the Center (Attachment C).

Site Development Permit
The proposed Project includes façade upgrades to all six buildings in the Center (Attachment D; Sheets A-4.2 – A-7.5). The upgrades do not result in any change to the footprints/square footage of the buildings. The current building elevations, which have remained unchanged from their original County approval, consist of sloped Spanishstyle tile roofs with beige stucco walls. The proposed upgrades to the building elevations have been designed to reflect a ‘Contemporary Transitional’ architectural theme. This includes architectural elements such as flat rooflines, stone veneer accents, a gray color palate, and smooth stucco building finishes. The building façades also include new aluminum storefronts with clear anodized finishes, and strategically-placed metal awnings and overhangs. Roof heights fluctuate in order to provide a varying roofline and architectural projections, with heights varying between 14 to 26 feet, well below the 40-foot maximum building height allowed in the NMU zoning district. All rooftop mechanical equipment will be screened (Attachment D; Sheets A-2.1 – A-2.2).

5.5.1 Packet Pg. 657
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 6 ends

The Project also includes the creation of a new plaza/courtyard area located between Building C and Building D (Attachment D; Sheet LC-2.0). The approximately 5,717- square foot area would include seating, a children’s play area, and shade structures.

The plaza would be well-landscaped with accent trees, pots, and planters, as well as a large olive tree as a centerpiece.

In order to accommodate the proposed courtyard, certain areas of the parking lot will need to be restriped and repaved, resulting in the addition of 22 parking stalls (Attachment D; Sheet A-2). Other site improvements include new and upgraded trash enclosures (Attachment D; Sheets A8.1 – A8.2), which will meet the State’s new waste management requirements, and new parking lot lighting (Attachment D; Sheet E-5). The Project also includes new pedestrian pathways that provide connections from existing public sidewalks into the Center. Two new walkways are proposed on Hon Avenue providing pedestrian access to Buildings B and F. A new gate and crosswalk near the front of Building A is also proposed, which will provide access to the Aliso Creek Bikeway.

The Project also includes several improvements requested by the City intended to benefit the surrounding community, which are reflected in Site Development Permit Condition of Approval Nos. 16 and 17. These include:
• Extension of the existing block wall along Katie Avenue to the edge of the property. There is currently an approximately 10-foot gap in the wall with chain link fence as the perimeter boundary.
• Payment of funds to the City in support of planting a robust landscaping hedge within the City-owned parkway along Katie Avenue to enhance the screening behind Building A.
• Extend the existing block wall along the Aliso Creek Bikeway from its current point of termination to the new pedestrian access gate near the front of Building A. This length of wall (approximately 150 linear feet) will measure 6-feet in height on the Center’s side.
• Increase the height of the existing block wall along the Aliso Creek Bikeway to 6- feet in height measured from the Center’s side.

The proposed upgraded architecture of the buildings, new courtyard area, and various site improvements all complement the existing surrounding land uses and comply with

5.5.1 Packet Pg. 658
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 7 ends

the development standards in the Zoning Code.

Joint Parking Use Permit
The number of parking stalls required for a particular use or type of business are contained in LHMC Table 9-44.A (Number of Parking Stalls Required). The parking requirements for a business are typically calculated by applying the ratio identified by LHMC Table 9-44.A to the gross floor area of the use. For instance, a 1,000 square foot retail store would require five (5) parking stalls since the parking ratio for general retail uses is one (1) stall per 200 square feet. The Code’s approach to determining the amount of parking required for a use assumes businesses utilize 100% of the required parking at all times. This is a common approach that cities utilize in determining the parking needs for non-residential uses, but it can overstate required parking.

For commercial centers, required parking is based on the total parking needed to serve all existing businesses, including vacant storefronts. The parking requirements are compared to the total parking inventory of the center to determine if there is a surplus or deficit of parking stalls. Since commercial centers typically have a variety of uses that have differing parking demand periods during a business day, the Code provides the opportunity for the joint use of parking facilities with an approved parking plan (LHMC Section 9-44.070). This approach to calculating parking demand is generally referred to as “shared parking”, which is made possible through the approval of a Joint Parking Use Permit by the Planning Agency.

The Applicant has applied for a Joint Parking Use Permit, which includes an Observed Parking Study (“Study”) prepared by RK Engineering Group, Inc. (Attachment E). The Study follows standard Institute of Transportation Engineers practices and guidelines for determining parking demands for a neighborhood shopping center. Parking counts were taken at one-hour intervals on Thursday – Saturday, November 14 – 16, 2019 from 7:00 am to 10:00 pm. These days and hours of observation were chosen to capture the busiest weekday and weekend days of the week. The methodology used in the Study is a blended approach to calculating parking using observed actual demand for existing tenants, plus Code required parking for future tenants. The parking surveys were obtained during typical weather conditions and were completed prior to the COVID-19 Pandemic. The peak parking demand observed for the existing tenants was on Saturday at 2:00 pm, when 94% of the parking lot was occupied.

The Study also included simulated requirements for vacant retail space in the Center, which would not be captured by the observed parking counts. Retail businesses are

5.5.1 Packet Pg. 659
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 8 ends

permitted by right in the Neighborhood Mixed Use zoning district and require one parking stall per 200 square feet of gross floor area. At the time of the Study, there was 9,520 square feet of vacant space in the Center, which would require 48 parking stalls when using the Code parking requirements for General Retail. The Study also allocated 100 parking stalls for the proposed 20,000 square foot veterinary clinic planned for Building A.

Furthermore, when analyzing shared parking, the City has typically increased required parking by an additional 10% as a best practice to account for potential parking demand fluctuations. When combining the peak parking demand (Saturday, 2:00pm), the required parking for vacant tenant spaces, and the 10% buffer, the actual parking demand is 363 parking stalls for the Center. With a proposed parking inventory of 388 stalls, a projected surplus of 25 stalls will remain available for the Center, which results in an adequate number of parking stalls to accommodate the proposed use mix of tenants during all times of the year assuming a full tenant occupancy scenario. The approval of the proposed CUP/PUP will reflect the Center’s actual parking demand, and enable the Applicant to use the Center’s surplus parking capacity for a wide range of potential new tenants that may require a higher parking demand, such as health clubs, medical offices, and restaurants.

General Plan Consistency/Alicia Gateway Opportunity Area In order to approve the Project, the Planning Agency must find that the Project is consistent with the Laguna Hills General Plan. Staff has concluded that the Project is consistent with several General Plan Goals and Policies. Specifically, the Project:
• Creates diverse and vibrant activity centers and events that bring people together as a community. (Goal LU-1).
o Promote walkability throughout the community through enhanced pedestrian amenities, attractive streetscapes, plazas, and civic gathering areas (Policy LU-1.4).
o Increases opportunities for pedestrian and bicycle connections to activity centers by well-designed and shaded pathways (Policy LU-1.6). • Is compatible and interdependent with neighboring uses (Goal LU-2). o Improve connections with surrounding uses by enhancing landscaping,

5.5.1 Packet Pg. 660
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 9 ends

providing pedestrian connections, incorporating green areas, and planting street trees (Policy LU-2.2).
o Minimize impacts to surrounding neighborhoods and land uses through context-sensitive site design and architecture (Policy LU-2.8). • Proposes infill development that involves the revitalization of property in an economically and environmentally sustainable manner (Goal LU-3). o Encourages new development that uses land efficiently and offers flexibility to changing resident and shopping needs, contributing to the long-term vitality of the community (Policy LU-3.2).
o Ensure safe, efficient pedestrian connections are made between adjacent neighborhoods, sidewalks, parking areas, and entrances to stores (Policy LU-3.3).
o Incorporate open spaces, plazas, and outdoor dining areas into new development and redevelopment to provide visual relief and community gathering spaces (Policy LU-3.4).
o Creates a safe, inviting, and functional pedestrian and cyclist environments in new public and private development (Policy LU-3.10). • Places a high priority on design, architecture, and landscaping that reflect the community’s identity and gracious lifestyle (Goal LU-4). o Create distinctive gateway architecture, landscaping, and signs at major entries to the community and in community activity centers (Policy LU4.1). o Encourage developers to create unique project identities that enhance the overall character of the City (Policy LU-4.8).
• Expands the variety of services, shopping, and entertainment opportunities in the community (Goal LU-6).
• Facilitates the creation and expansion of private sector businesses and associated local career choices for Laguna Hills residents (Goal LU-7).

5.5.1 Packet Pg. 661
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 10 ends

o Encourages private property owners to revitalize, upgrade, and beautify aging and underperforming commercial and business areas (Policy LU-7.4).

The proposed Project is also located within the Alicia Gateway Opportunity Area (“AGOA”). As part of the City’s 2009 Comprehensive General Plan Update, the City Council adopted the AGOA, which encompasses the entire Neighborhood Mixed Use zoning district, including Honali Plaza. The Planning Agency must determine if the Project is consistent with the vision for the AGOA, which seeks to create a moderate density center and gathering place by promoting:
• A mix of retail, housing, and office uses;
• Walkable connections, plazas, and green space for community gatherings; • High-quality design and architecture;
• Orientation of buildings toward the street and pedestrians; • Accessibility to transit; and
• Connectivity to promote walking from nearby neighborhoods to the Gateway.

The proposed Project is consistent with the vision and requirements of the AGOA. The Project:
• Will continue to add to the mix of land uses in the area and provides new services that are otherwise limited in the NMU zoning district;
• Will be walkable to other existing commercial/retail uses within the AGOA; • Continues the high-quality design and architecture envisioned for the AGOA and is an aesthetic improvement to the neighborhood while providing a compatible development that respects the existing commercial development on Alicia Parkway and the single-family residential neighborhood north of the Center; • Will provide outdoor dining areas for gatherings oriented toward Alicia Parkway; CONCLUSION:

Staff supports the Project as it continues to implement the goals and objectives of the General Plan and Alicia Gateway Opportunity Area. The Project will facilitate outdoor

5.5.1 Packet Pg. 662
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 11 ends

gathering opportunities and provides new development opportunities that use land efficiently and offer flexibility to changing resident and shopping needs, contributing to the long-term vitality of the community. The incorporated outdoor courtyard area will provide visual relief and community gathering spaces as well as creating a safe, inviting, and functional pedestrian environment.

Given the results of the Observed Parking Study, it is appropriate to establish a shared parking approach at the Center through the City’s Joint Parking Use Permit process and allow the Applicant the opportunity to establish a more efficient approach for the use of the Center’s parking supply pursuant to LHMC Section 9-44.070. This approach uses actual parking counts to determine parking need, rather than strictly utilizing the City’s standard parking requirements found in Table 9-44.A. The Study demonstrates that the Center’s peak parking demand is far below the parking required by Code. Therefore, the approval of the PUP will reflect the Center’s actual parking demand, and enable the Applicant to use the Center’s surplus parking capacity for a wide range of potential new tenants that may require a higher parking demand.

As a standard City practice for PUPs, staff requires applicants to address future changes in parking demand due to tenant turnover and change in the mix of uses once the PUP has been approved. For instance, Joint Parking Use Permit Condition of Approval No. 12 authorizes the Community Development Director to request an update to the Study if the tenant mixture at any time becomes problematic to the Center’s parking and circulation.

With the recommended Conditions of Approval, the Project meets development standards and design guidelines of the Code and meets the goals, policies, and procedures of the General Plan. Therefore, staff recommends approval of the proposed Project.

PUBLIC NOTICE:

Neighborhood Outreach
The Applicant held a virtual neighborhood outreach presentation on March 1, 2021.

Outreach notices were sent to property owners within 1,000 feet of the property. The virtual presentation was attended by approximately 10 attendees, and questions and concerns primarily focused on Jordan Market and the potential of loading/unloading areas behind Building A. In the time since the outreach presentation, the Applicant has shared that there is no intention for Jordan Market to move to Building A, and there will

5.5.1 Packet Pg. 663
SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza) March 22, 2022

Page 12 ends

be no loading/unloading/storage of merchandise behind Building A associated with the proposed veterinary clinic.

Public Notice
The proposed Project was advertised in an adjudicated newspaper of general circulation on March 10, 2022. In addition, approximately 287 property owners within 1,000 feet of the Property and all current tenants of Honali Plaza were mailed a public hearing notice, which exceeds LHMC requirement of mailing hearing notices to property owners within 300 feet of the property boundaries. To date, no comments have been received. Any written comments received will be distributed at the Planning Agency Public Hearing.

CEQA FINDINGS:

Staff has reviewed the proposed Project for compliance with the California Environmental Quality Act (CEQA) and determined that this project is categorically exempt from CEQA pursuant to Section 15301 of Title 14, Chapter 3 of the California Code of Regulations (Class 1, Existing Facilities). This exemption applies to the permitting or minor alteration of existing structures.

ATTACHMENTS:
• Attachment A – Proposed Resolution of Approval (SDP)
• Attachment B – Proposed Resolution of Approval (PUP)
• Attachment C – Letter of Justification
• Attachment D – Plan Set
• Attachment E – Observed Parking Study

5.5.1 Packet Pg. 664
1660912.1
RESOLUTION NO. PA2022-X

A RESOLUTION OF THE PLANNING AGENCY OF THE

CITY OF LAGUNA HILLS, CALIFORNIA, APPROVING SITE
DEVELOPMENT PERMIT (SDP) NO. USE-0027-2020, A

REQUEST BY GB ARCHITECTURE ON BEHALF OF
WARMINGTON PROPERTIES, INC. FOR

ARCHITECTURAL AND SITE UPGRADES TO HONALI
PLAZA, LOCATED AT 24721 – 24781 ALICIA PARKWAY,

INCLUDING AN EXEMPTION FROM THE CALIFORNIA

ENVIRONMENTAL QUALITY ACT (CEQA) PER CEQA
GUIDELINES SECTION 15301 OF TITLE 14, CHAPTER 3
OF THE CALIFORNIA CODE OF REGULATIONS (CLASS 1,

EXISTING FACILITIES)
The Planning Agency of the City of Laguna Hills, California, hereby finds, determines, declares, and resolves as follows:

WHEREAS, GB Architecture, on behalf of Warmington Properties, Inc. (the “Applicant”), has filed an application for Site Development Permit (SDP) No. USE-0027- 2020 for a variety of site and architectural improvements to the Honali Plaza, including a comprehensive building façade upgrade, a new courtyard/outdoor experience area, and renovated landscaping at 24721 – 24781 Alicia Parkway (“Project Site” or “Center”), in the Neighborhood Mixed Use (NMU) zoning district (“Project”); and,

WHEREAS, the Project is hereby found to be Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (Class 1, Existing Facilities) of Title 14, Chapter 3 of the California Code of Regulations. This exemption applies to the permitting or minor alteration of existing structures; and, WHEREAS, the Planning Agency held a duly noticed public hearing and considered public comments and written and oral information and testimony presented by City staff, community residents, and other interested parties at a duly noticed public hearing held on March 22, 2022; and,
WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred.

NOW, THEREFORE, THE PLANNING AGENCY OF THE CITY OF

LAGUNA HILLS, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

SECTION 1. The above recitals are true and correct, and are incorporated herein by reference.

5.5.1.a
Packet Pg. 665 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 2 ends

1660912.1
SECTION 2. The Planning Agency hereby determines that the required findings by the City for approval of Site Development Permit No. USE-0027- 2020 have been met and made as follows:

Site Development Permit

1. The site design complies with standards of the Development Code.

The current site design and architecture was entitled and constructed under the jurisdiction of the County of Orange. The Project includes an update to the site design, specifically the outdoor courtyard area, which comply with the development standards of the Neighborhood Mixed Use zoning district, including maximum lot coverage, density/FAR, minimum landscape coverage, and other required development standards. With approval of the proposed Joint Parking Use Permit (USE-0084-2022), the parking inventory allows for the proposed updates.

2. The site is suitable for the proposed development.

The site design aspects of the Project will be compatible with, and not detrimental to, surrounding development and with the overall design quality prevalent in the City. These aspects include setbacks, access, landscaping/lighting, and other architectural site design elements (i.e., height, scale, mass, and appearance). The updated buildings reflect a contemporary architectural theme incorporating visual interest and building articulation. Conditions of approval have been included to ensure the Project will be compatible with the surrounding area with respect to noise, parking, and public safety.

3. The project is consistent with the General Plan and applicable design guidelines.

As part of the City’s 2009 Comprehensive General Plan Update, the City Council adopted the Alicia Gateway Opportunity Area (AGOA), which encompasses the entire Neighborhood Mixed Use (NMU) zoning district, including the Project Site. The AGOA/NMU seeks to “create a moderate density center and gathering place by promoting a mix of retail, housing, and office uses; walkable connections, plazas, and green space for community gatherings; high-quality design and architecture; orientation of buildings toward the street and pedestrians; accessibility to transit; connectivity to promote walking from nearby neighborhoods to the Gateway” (General Plan Land Use Element pp. LU-20 – 21). The AGOA designation also promotes the development of vertical and horizontal mixed-use. Allowed uses include commercial, retail, office, and residential; however, standalone residential is prohibited (Laguna Hills General Plan, 2009).

5.5.1.a
Packet Pg. 666 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 3 ends

1660912.1
The Project is consistent with the vision and requirements of the AGOA.

The Project will continue to add to the mix of land uses in the area and provide new opportunities that are otherwise limited in the NMU zoning district. The Project continues the high-quality design and architecture envisioned for the AGOA and is an aesthetic improvement to the neighborhood. The Project will facilitate outdoor gathering opportunities and provides new development opportunities that uses land efficiently and offers flexibility to changing resident and shopping needs, contributing to the longterm vitality of the community. The outdoor courtyard area will provide visual relief and community gathering spaces as well as creating a safe, inviting, and functional pedestrian environment.

4. The site design and structural components are appropriate for the site and function of the proposed uses.

The Project will be of quality design with an appropriately-scaled framework of architectural and landscaping elements. Although the site design remains generally the same as it’s current configuration, the site has been designed to accommodate the proposed outdoor courtyard area. In the event circulation/parking issues occur on the site, Joint Parking Use Permit conditions of approval require the Applicant to resolve such conditions by identifying and implementing appropriate circulation improvements working with the City. The new facilities have been designed to meet all development standards. High-quality development features will be provided throughout the Center through site design (e.g., building and outdoor orientation, walls, and screening), architecture (e.g., mass, scale and form, style, material and color) and landscaping (e.g., screening, and parking lot trees and shade). Development of the Project, as conditioned, will be compatible with, and not detrimental to, surrounding development, and with the overall design quality prevalent in the City.

NOW, THEREFORE, based upon the above findings, the Planning Agency of the City of Laguna Hills does hereby approve Site Development Permit No. USE-0027- 2020 subject to the following conditions of approval:

General

1. The following Conditions of Approval shall be binding and enforceable against, and, whenever used herein, the term “Applicant” shall mean and refer to, each of the following: The Project Applicant, GB Architecture, on behalf of Warmington Properties, Inc., the owner(s) and tenant(s) of the property, and each of their respective successors and assigns.

2. Unless the context dictates otherwise, whenever the term “this Permit” is used in the following Conditions of Approval, it shall collectively refer to the Site

5.5.1.a
Packet Pg. 667 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 4 ends

1660912.1
Development Permit (SDP) No. USE-0027-2020 approved pursuant to this Resolution, as well as the plans, studies, and exhibits submitted to the City by the Applicant to describe and depict the improvements to be constructed as a part of the Project, and as otherwise modified by these Conditions of Approval.

3. To the fullest extent permitted by law, the Applicant shall, at its sole cost and expense, protect, defend, indemnify, and hold harmless the City, its elected and appointed officers and officials, employees, agents, departments, agencies, authorized volunteers, consultants, attorneys, boards, commissions, and committees, and instrumentalities thereof ("Indemnitees"), from and against any and all claims, liabilities, losses, fines, demands, penalties, lawsuits, writs of mandamus, and any other claims or actions or proceedings of any kind whatsoever (whether legal, equitable, declaratory, administrative or adjudicatory in nature), and alternative dispute resolution procedures (including, but not limited to, arbitrations, mediations, and other such procedures), judgments, orders and decisions (collectively "Claims" and “Actions”), brought against the Indemnitees, which seek to attack, challenge, modify, set aside, void, or annul any action of or any permit or approval issued by the Indemnitees (including actions approved by the voters of the City) for, in connection with, or concerning the approval of this Permit. It is expressly understood and agreed that the City shall have the right to approve, which approval will not be unreasonably withheld, the legal counsel providing the defense of the Indemnitees for the Claims and Actions, and that the Applicant shall promptly reimburse the City for all costs and expenses directly and necessarily incurred by the City in the course of the defense, including reasonable attorneys' fees. The City shall promptly notify the Applicant of any Claims and Actions brought against the Indemnitees and shall cooperate in the defense of any such Claims and Actions. If the Applicant fails to so defend the Claims and Actions, the City shall have the right but not the obligation to do so and, if it does, the Applicant shall promptly pay the City's full cost thereof.

4. Approval of this Permit constitutes approval of the proposed Project only to the extent that it complies with the City’s Development Code and any other applicable zoning regulations. Approval does not include any action or findings as to compliance or approval of the Project regarding any other applicable ordinance, regulation, or requirement.

5. Failure to abide by and faithfully comply with any and all conditions of approval shall constitute grounds for revocation of this Permit by the Laguna Hills Planning Agency.

6. The Applicant shall agree in writing to these conditions of approval within 30 days of the Planning Agency’s approval.

7. The conditions of Project approval set forth herein include certain development impact fees and other exactions. Pursuant to Government Code §66020(d),

5.5.1.a
Packet Pg. 668 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 5 ends

1660912.1
these conditions constitute written notice of the amount of such fees, and/or exactions. The Applicant is hereby notified that the 90-day protest period in which the Applicant may protest the fees, dedications, reservation, or exactions imposed on this Project through the Conditions of Approval, commencing from the date of approval of the Project, has begun.

8. Pursuant to City Council Resolution No. 2017-07-11-2, the Applicant shall reimburse the City for any outstanding staff time spent on the processing of this Permit within 60 days of the Planning Agency’s approval.

9. This Permit shall expire and be of no further force or effect if the Permit is not implemented within two years from March 22, 2022.

Planning Division

10. Prior to the commencement of any work, the Applicant shall provide a contact number for the public to call concerning dust, noise, or other constructionrelated impacts. The information shall also be posted on site in a manner approved by the Community Development Director.

11. The Applicant shall maintain the Project Site in compliance with all property maintenance standards of the Laguna Hills Municipal Code (“LHMC”) Chapter 9-74, and the regulations set forth therein.

12. The Applicant shall maintain the Project in compliance with the noise standards of the City of Laguna Hills Noise Ordinance (LHMC 5-24). Should the City receive complaints related to noise associated with the Project which are in violation of the Noise Ordinance, the Applicant agrees to promptly implement reasonable noise attenuation measures.

13. Prior to issuance of any grading permits, the Applicant shall submit the Project’s grading plan to the Community Development Director for review and approval.

The grading plan shall be consistent with the architectural site plan as approved by this Permit to the reasonable satisfaction of the Community Development Director.

14. Prior to the issuance of a building permit, the Applicant shall submit a landscape and irrigation plan to the Community Development Director for review and approval. The plan shall demonstrate compliance with Laguna Hills Municipal Code Chapter 9-46 and 9-47, including sufficient wall screening, landscaping, planter size and shade trees along the site perimeter and within the Project parking lot, installation of “Smart” landscape irrigation controllers, low precipitation-rate sprinkler heads, and water efficient landscaping, as applicable.

5.5.1.a
Packet Pg. 669 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 6 ends

1660912.1

15. The Applicant shall deposit with the Community Development Department the estimated reasonable cost necessary to retain a qualified landscape professional to review the Applicant’s proposed landscape and irrigation plans, as well as inspect the Applicant-installed landscaping to ensure compliance with the approved landscaped plans. The amount deposited shall be in accordance with a written proposal obtained by the City pursuant to its Purchasing Ordinance. Prior to the issuance of building shell final or issuance of a Certificate of Use or Occupancy permit, the Applicant shall pay the actual cost of landscape plan check and inspection or be entitled to a refund of funds deposited, if any. All required landscaping shall be installed prior to issuance of a Certificate of Use and Occupancy.

16. Prior to the issuance of a building permit, the Applicant shall submit a perimeter wall plan to the Community Development Director for review and approval. The plan shall include section views, elevation views, materials of the walls, and shall demonstrate compliance with Laguna Hills Municipal Code Section 9-

40.100. The perimeter wall plan shall incorporate the following:
a. Extension of the existing block wall along Katie Avenue to the edge of the property. There is currently an approximately 10-foot gap in the wall with chain link fence as the perimeter boundary.
b. Extension of the existing block wall along the Aliso Creek Bikeway from its current point of termination to the new pedestrian access gate near the front of Building A. This length of wall shall measure 6-feet in height on the Center’s side.
c. Increase the height of the existing block wall along the Aliso Creek Bikeway to 6-feet in height measured from the Center’s side.

17. Prior to issuance of a building permit, the Applicant shall make payment of $6,900 to the City of Laguna Hills for the purchase and installation of a landscaped hedge within the City-owned and maintained parkway along Katie Avenue in order to enhance the screening of loading and unloading areas behind Building A. The hedge will consist of sixty (60) 15-gallon Ficus-Nitida, and will be installed by the City to the satisfaction of the City Engineer.

18. The Center shall be permanently maintained in an orderly fashion by the provision of regular and removal of trash and debris, and comply with all property maintenance standards as required by LHMC Chapter 9-74.

Specifically, all business shall be permanently maintained in an orderly fashion by the provision of regular and removal of trash and debris, and all business activities and related services shall be conducted entirely within the tenant space.

5.5.1.a
Packet Pg. 670 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 7 ends

1660912.1

19. Deliveries are prohibited between the hours of 10:00pm and 7:00am. Delivered materials shall be promptly stored within the tenant space. No equipment or materials shall be permitted to remain outdoors at any time unless contained within an approved enclosure.

Building Division & Orange County Fire Authority

20. The Applicant shall be responsible for ensuring all applicable building permits are obtained from the City of Laguna Hills, as required by Section 103 of the 2019 California Building Code prior to commencement of any work for which a permit is required.

21. Any required documents submitted for the purpose of building permit issuance shall be accurately labeled and reflect all work, as required by Section 107 of the 2019 California Building Code.

22. All construction shall comply with the applicable California Building, Plumbing, Mechanical, Electrical, and Green Building Codes with regard to the appropriate occupancies for each permit requested.

23. Plans submitted for this Project for the purpose of obtaining a building permit shall comply with California Disabled Accessibility requirements, as required by Chapter 11 of the California Building Code.

24. Prior to the issuance of a building permit, the Applicant shall include a copy of this Permit (the signed resolution of approval) in the City building plan sets submitted for the purpose of obtaining a building permit.

25. Prior to issuance of building permits, Applicant shall submit approvals from the Orange County Fire Authority or provide verification of plan submittal.

26. During construction, adequate emergency access shall be maintained to the site at all times in accordance with any requirements of the Orange County Fire Authority (OCFA).

27. Prior to issuance of building permits, the Applicant shall submit Construction and Demolition Waste Recycling Program paperwork, if applicable, as required by Laguna Hills Municipal Code Chapter 5-48, and to comply with mandates of CalRecycle.

Public Services Department

28. Prior to issuance of any Building Permits the Applicant shall prepare for review and approval by, and to the reasonable satisfaction of, the Community Development Director and the City Engineer a Water Quality Management Plan (WQMP) for all priority projects as defined in the NPDES permits and County

5.5.1.a
Packet Pg. 671 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 8 ends

1660912.1
of Orange Model WQMP technical guidance document. The WQMP shall identify Low Impact Development (LID) BMPs and routine structural and nonstructural measures specified in the current Orange County Drainage Area Management Plan (DAMP) and the San Diego Regional Water Quality Control Board (SDRWQB) requirements. The WQMP must also:
a. Address site design BMPs (as applicable) such as minimizing impervious areas, maximizing permeability, minimizing directly connected impervious areas, creating reduced or “zero discharge” areas, conserving natural areas, preserving trees, and retaining existing site hydrology to the maximum extent practicable. b. Include a design goal to maintain or replicate the pre-development hydrologic functions through site preservation, infiltration, retention, detention, evapotranspiration, and filtration treatment systems. c. Incorporate applicable routine source control BMPs as defined in the DAMP and provide a detailed description of their implementation. d. Incorporate applicable treatment control BMPs as defined in the DAMP to the approval of the City Engineer.
e. Implement Low Impact Development (LID) BMPs to reduce runoff to the maximum extent practicable.
f. Include full capture trash and debris systems consistent with SDRWQCB Order No. R9-2017-0077 and per the approval of the City Engineer.
g. Include an Operation and Maintenance (O&M) plan that identifies the mechanism(s) by which long-term O&M of all post construction BMPs will be provided and funded, to include an annual selfcertification of maintenance and operational functioning of the BMPs to be issued to the City Engineer.
h. The Project Site shall meet hydromodification criteria and the Applicant shall document compliance by providing calculations consistent with the Grading Plan and WQMP and in accordance with the SDRWQCB NPDES Order No. R9-2013-0001, Section E.3.c(2), as amended by Order Nos. R9-2015-0001 and R9-2015-0100
Permits. Hydromodification determinations shall be made using the South Orange County Hydrology Model as provided by the County of Orange.

29. Prior to issuance of certificate of use and occupancy, the Applicant shall provide an Americans with Disabilities Act (ADA) site review of existing

5.5.1.a
Packet Pg. 672 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 9 ends

1660912.1
pathways, sidewalks and access ramps for both on-site access and adjacent to the site access along the accessible pathways. The accessible pathway shall not include a path within any drive aisle, except as necessary to cross a drive aisle at 90° to the drive aisle. The report shall be prepared by a qualified professional with expertise in the ADA field and shall include an implementation plan to correct all deficiencies noted and as reasonably approved by the City Engineer. Any sidewalk or pathway not in compliance with ADA standards shall be reconstructed to the City’s standards.

30. Prior to the issuance of certificate of use and occupancy, the Applicant shall demonstrate compliance with the WQMP in a manner meeting the reasonable satisfaction of the City Engineer, including:
i. Demonstration that all structural BMPs described in the WQMP have been implemented, constructed, and installed in conformance with approved plans and specifications.
j. Demonstration that the Applicant has complied with and/or is prepared to implement all non-structural BMPs described in the WQMP.
k. Demonstration that an adequate number of copies of the project’s approved WQMP are available for the future occupants.
l. Demonstration that the Applicant has agreed to and recorded CC&R’s, an agreement, or another legal instrument approved by the City Attorney, as applicable, requiring the property owner, successors, tenants (if applicable), and assigns to operate and maintain, in perpetuity, the post-construction BMPs described in the WQMP.

31. Prior to the issuance of the certificate of use and occupancy, trash/recycling enclosures shall be constructed in compliance with the City’s standards to include an impermeable roof.

32. During the course of the Project construction, the Applicant shall not allow any work to be performed within the public right-of-way until after a Public Property Encroachment Permit has been issued by the City Engineer including the payment of applicable fees and/or deposits as determined by City.

33. During the course of the Project construction, it shall be the Applicant’s sole responsibility to protect-in-place existing public improvements. Prior to the issuance of a certificate of use and occupancy, public improvements that are damaged as a result of the project construction shall be promptly repaired or replaced by the Applicant to the reasonable satisfaction of the City Engineer.

5.5.1.a
Packet Pg. 673 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 10 ends

1660912.1

34. During the course of the Project construction, no public streets shall be utilized for temporary storage of any construction materials and no vehicles shall be off-loaded of deliveries or filled with materials to be exported by utilizing any public street for a staging area.

35. Prior to the issuance of certificate of use and occupancy, in order to mitigate trash and debris from the Project from entering into the City’s storm drain system, the Applicant shall install full capture trash systems at all existing onsite storm drain inlets consistent with SDRWQCB Order No. R9-2017-0077 and per the approval of the City Engineer
PASSED, APPROVED, AND ADOPTED this 22nd day of March, 2022. ________________________________

DAVE WHEELER, CHAIR
ATTEST:
______________________________________

MELISSA AU-YEUNG, CITY CLERK

5.5.1.a
Packet Pg. 674 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 11 ends

1660912.1

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss

CITY OF LAGUNA HILLS )
I, Melissa Au-Yeung, City Clerk of the City of Laguna Hills, California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of Resolution No. PA2022-X-X adopted by the Planning Agency of the City of Laguna Hills, California, at a Regular Meeting thereof held on the 22nd day of March, 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
_____________________________________

MELISSA AU-YEUNG, CITY CLERK

5.5.1.a
Packet Pg. 675 Attachment: Attachment A – Proposed Resolution of Approval (SDP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) 1660920.1
RESOLUTION NO. PA2022-X

A RESOLUTION OF THE PLANNING AGENCY OF THE

CITY OF LAGUNA HILLS, CALIFORNIA, APPROVING
JOINT PARKING USE PERMIT (PUP) NO. USE-0084-2022,

A REQUEST BY GB ARCHITECTURE ON BEHALF OF
WARMINGTON PROPERTIES, INC. TO ESTABLISH JOINT

USE PARKING FACILITIES AT HONALI PLAZA, LOCATED
AT 24721 – 24781 ALICIA PARKWAY, INCLUDING AN

EXEMPTION FROM THE CALIFORNIA ENVIRONMENTAL

QUALITY ACT (CEQA) PER CEQA GUIDELINES SECTION
15301 OF TITLE 14, CHAPTER 3 OF THE CALIFORNIA
CODE OF REGULATIONS (CLASS 1, EXISTING

FACILITIES)
The Planning Agency of the City of Laguna Hills, California, hereby finds, determines, declares, and resolves as follows:

WHEREAS, GB Architecture, on behalf of Warmington Properties, Inc. (“the Applicant”), has filed an application for Joint Parking Use Permit (PUP) No. USE0084-2022, a request to establish Joint Use Parking Facilities to accommodate shared parking for the Honali Plaza, located at 24721 – 24781 Alicia Parkway (“Project Site” or “Center”), in the Neighborhood Mixed Use (NMU) zoning district (“Project”); and,

WHEREAS, the Project is hereby found to be Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (Class 1, Existing Facilities) of Title 14, Chapter 3 of the California Code of Regulations. This exemption applies to the permitting or minor alteration of existing structures; and, WHEREAS, the Planning Agency held a duly noticed public hearing and considered public comments and written and oral information and testimony presented by City staff, community residents, and other interested parties at a duly noticed public hearing held on March 22, 2022; and,
WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred.

NOW, THEREFORE, THE PLANNING AGENCY OF THE CITY OF

LAGUNA HILLS, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

SECTION 1. The above recitals are true and correct, and are incorporated herein by reference.

SECTION 2. The Planning Agency hereby determines that the required findings by the City for approval of Conditional Use Permit/Parking Use

5.5.1.b
Packet Pg. 676 Attachment: Attachment B – Proposed Resolution of Approval (PUP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 2 ends

1660920.1
Permit (CUP/PUP) No. USE-0082-2022 have been met and made as follows:

Joint Parking Use Permit

1. The proposed Joint Parking Use Permit is consistent with the intent and purpose of the development code.

The City’s parking requirements are contained in LHMC Chapter 9-44. The intent of the parking requirements in the development code is to ensure that all land uses provide safe access and on-site circulation with adequate offstreet parking facilities. The development code allows for shared use of parking facilities provided that it can be shown that adequate parking for all users is maintained. The Applicant has demonstrated that based upon the existing actual demand at the Center for existing uses, and the coderequired parking for vacancies and future uses, there is sufficient parking for the planned tenant mix, including uses that have higher parking ratios such as fitness, medical, and restaurant uses. A comprehensive shared parking plan allows additional flexibility in leasing to a larger variety of users and allows a more efficient use of the existing parking supply. Condition of Approval No. 12 provides the Community Development Director with the ability to address parking and/or circulation issues relative to any change in any use or any portion of any use (i.e., change in tenant mix) in the shopping center to ensure the proposed Joint Parking Use Permit remains consistent with the requirements of the development code.

2. The joint parking use permit provides a reasonable and enforceable means for all uses to share parking facilities.

The shared parking approach proposed for the Center is enforceable upon all current and future tenants to ensure the parking is available for the shopping center. Any changes to the property affecting access or parking would require City approval, at which time the impact on shared parking would be evaluated. This permit is binding and enforceable against the property owner and all existing and future tenants per the project conditions of approval. Additionally, the Community Development Director is able to evaluate the available parking supply for any change in tenant mix at the Center as provided for in Condition of Approval No. 12.

3. The requirement for parking established by the joint parking use permit shall assure that the parking demands for the participating uses are continually met.

This permit is binding and enforceable against the Property Owner and all existing and future tenants per the conditions of approval. Additionally, the Community Development Director is able to evaluate the available parking

5.5.1.b
Packet Pg. 677 Attachment: Attachment B – Proposed Resolution of Approval (PUP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 3 ends

1660920.1
supply when any change in tenancy, or mix of uses is proposed at the Subject Site as provided for in Condition of Approval No. 12. Therefore, parking demand will continually be met at the Center. Should a parking issue occur resulting from a change in the tenancy or mix of uses, the Community Development Director, per Condition of Approval No. 12, can require the Applicant to provide a parking study to demonstrate that parking is still sufficient.

4. The proposed use is consistent with the General Plan.

The project is consistent with the goals and policies of the General Plan. In particular, with regard to parking, the General Plan under the Mobility Element (M-15) states the importance of utilizing a broad range of parking management tools to balance parking spillover effects and excessive parking requirements, to encourage efficient use of the land. Currently, the subject parking lot is often underutilized. Establishing formal shared parking will allow additional businesses that could not otherwise locate in the Center, utilizing currently underused parking, while still providing adequate parking for all users.

5. The nature, condition, and development of adjacent uses, buildings, and structures have been considered and the proposed conditional use will not adversely affect or be materially detrimental to the adjacent uses, buildings, or structures.

The Project Site is located in the Neighborhood Mixed Use zoning district, adjacent to the Interstate 5 freeway. The Project Site is on the northwest corner of Alicia Parkway and Hon Avenue. The surrounding area consists of existing single-family homes and the Alicia Parkway/I-5 exit to the north, existing single-family homes to the west, and existing commercial retail/office centers to the south and east across Hon Avenue and Alicia Parkway. The Project Site includes six multi-tenant buildings and a Wendy’s drive-thru restaurant pad on a separate parcel, with a combined total of approximately 72,202 square feet of retail space divided between 27 tenant spaces. The uses in the Center currently consist of a mix of retail, restaurants, and services uses. The proposal to use shared parking on the Project Site is consistent with the commercial nature of the property’s use.

Numerous commercial properties within the City utilize shared parking as an opportunity to allow a variety of commercial uses within a shopping center. Conditions of approval ensure the use of shared parking on the site will not be materially detrimental. For example, Condition of Approval No. 12 requires the Property Owner to update the parking and circulation study for the shopping center whenever a change tenancy, or a change in the mix of uses is proposed. These requirements will ensure sufficient parking is available on the site for current and future tenants and uses.

5.5.1.b
Packet Pg. 678 Attachment: Attachment B – Proposed Resolution of Approval (PUP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 4 ends

1660920.1

6. The proposed site is adequate in size and shape to accommodate the use and integrate it with the existing and planned uses in the vicinity.

As described in Finding No. 5 above, surrounding uses include residential, commercial, retail and service uses. The Project Site is 8-acres and improved with six commercial buildings totaling 72,000 square feet. The Project Site is also improved with required landscaping around the perimeter and in interior areas of the site. The Project Site is typical of other commercial shopping centers in Laguna Hills in terms of the nature of the improvements provided that result in a functioning commercial property.

If staff determines insufficient parking exists on a site being considered for new tenants and uses due to the application of the City’s standard parking ratios, the City’s shared parking regulations contained in LHMC 9-44.070 allow property owners to base parking need on actual demand with the completion of a parking study to determine if a parking surplus exists on the property. The Applicant has submitted a parking study (“Study”) in order to evaluate the actual parking demand for the Project Site. When factoring in the proposed site improvements and including a 10% buffer for the Project Site, there is a total parking demand of 363 stalls, resulting in a surplus of 25 parking stalls for the Project Site. Therefore, existing and proposed improvements are sufficient to serve the Project Site. Off-site uses in the vicinity will not be impacted by the proposed shared parking approach since the Project Site will maintain all of the improvements required to function.

There are no uses proposed that would need to interface with the site. The existing and proposed uses are typical to those found in other shopping centers in Laguna Hills and do not require any unique or unusual site improvements to operate. Condition of Approval No. 12 will allow the Community Development Director to evaluate the available parking supply for any change in tenants or change in use at the Center in the future, to ensure the Applicant’s implementation of a shared parking approach will not result in inadequate parking now or in the future.

7. All required development standards prescribed by the Development Code can be achieved.

The proposed joint parking use permit will enable the Property Owner to determine required parking on the Center’s actual parking demand, and enable the Property Owner to accommodate a wider range of potential new tenants, broadening the range of services to serve the public, that may require more parking such as health clubs, medical offices, and restaurants.

The Applicant, in cooperation with the Property Owner, has submitted a parking study (“Study”) in order to evaluate the actual parking demand for the Project Site. When factoring in the proposed site improvements and including a 10% buffer for the Project Site, there is a total parking demand of 363 stalls, resulting in a surplus of 25 parking stalls for the Project Site.

5.5.1.b
Packet Pg. 679 Attachment: Attachment B – Proposed Resolution of Approval (PUP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 5 ends

1660920.1
This approach to determining parking needs on a property is authorized by LHMC 9-44.070. Therefore, the Applicant has demonstrated that it can comply with the City’s parking requirements. Condition or Approval No. 12 will allow the Community Development Director to evaluate the available parking supply for any change in tenancy or mix of uses at the Center in the future to ensure the shared parking approach will comply with the requirements of LHMC 9-44.070 in the future.

8. The conditions and limitations placed upon the use are necessary to ensure compatibility with adjacent or abutting uses and the preservation of the public peace, safety, and welfare.

The conditions of approval will ensure that the approval of the Joint Parking Use Permit will not result in the conditions described above. Condition of Approval No. 12 will allow the Community Development Director to evaluate the available parking supply for any change in tenant mix at the center and ensure the adequate parking will be available for all uses at the center. The ability to evaluate the center’s required parking for any change in mix of uses, and require reasonable mitigation measures based on future updates to the Center’s parking study to be implemented by the Applicant will ensure that incompatible conditions with adjacent or abutting uses will not materialize as a result of the approval of a Joint Parking Use Permit, and ensure that the public peace, safety and welfare is maintained.

NOW, THEREFORE, based upon the above findings, the Planning Agency of the City of Laguna Hills does hereby approve Joint Parking Use Permit No. USE-0082- 2022 subject to the following conditions of approval:

General

1. The following Conditions of Approval shall be binding and enforceable against, and, whenever used herein, the term “Applicant” shall mean and refer to, each of the following: The Project Applicant, GB Architecture, on behalf of Warmington Properties, Inc., the owner(s) and tenant(s) of the property, and each of their respective successors and assigns.

2. Unless the context dictates otherwise, whenever the term “this Permit” is used in the following Conditions of Approval, it shall collectively refer to the Conditional Use Permit/Parking Use Permit (CUP/PUP) No. USE-0082-2020 approved pursuant to this Resolution, as well as the plans, studies, and exhibits submitted to the City by the Applicant to describe and depict the improvements to be constructed as a part of the Project, and as otherwise modified by these Conditions of Approval.

5.5.1.b
Packet Pg. 680 Attachment: Attachment B – Proposed Resolution of Approval (PUP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 6 ends

1660920.1

3. Unless the context dictates otherwise, whenever the term “Project” is used in the following Conditions of Approval, it shall collectively refer to the plans and exhibits submitted to the City by the Applicant to depict the Project, as modified by these Conditions of Approval, including but not limited to the following:
application form (submitted June 9, 2020), Letter of Justification (dated January 18, 2022), and Observed Parking Study conducted by RK Engineering Group, Inc. (dated January 21, 2022).

4. To the fullest extent permitted by law, the Applicant shall, at its sole cost and expense, protect, defend, indemnify, and hold harmless the City, its elected and appointed officers and officials, employees, agents, departments, agencies, authorized volunteers, consultants, attorneys, boards, commissions, and committees, and instrumentalities thereof ("Indemnitees"), from and against any and all claims, liabilities, losses, fines, demands, penalties, lawsuits, writs of mandamus, and any other claims or actions or proceedings of any kind whatsoever (whether legal, equitable, declaratory, administrative or adjudicatory in nature), and alternative dispute resolution procedures (including, but not limited to, arbitrations, mediations, and other such procedures), judgments, orders and decisions (collectively "Claims" and “Actions”), brought against the Indemnitees, which seek to attack, challenge, modify, set aside, void, or annul any action of or any permit or approval issued by the Indemnitees (including actions approved by the voters of the City) for, in connection with, or concerning the approval of this Permit. It is expressly understood and agreed that the City shall have the right to approve, which approval will not be unreasonably withheld, the legal counsel providing the defense of the Indemnitees for the Claims and Actions, and that the Applicant shall promptly reimburse the City for all costs and expenses directly and necessarily incurred by the City in the course of the defense, including reasonable attorneys' fees. The City shall promptly notify the Applicant of any Claims and Actions brought against the Indemnitees and shall cooperate in the defense of any such Claims and Actions. If the Applicant fails to so defend the Claims and Actions, the City shall have the right but not the obligation to do so and, if it does, the Applicant shall promptly pay the City's full cost thereof.

5. Approval of this Permit constitutes approval of the proposed Project only to the extent that it complies with the City’s Development Code and any other applicable zoning regulations. Approval does not include any action or findings as to compliance or approval of the Project regarding any other applicable ordinance, regulation, or requirement.

6. Failure to abide by and faithfully comply with any and all conditions of approval shall constitute grounds for revocation of this Permit by the Laguna Hills Planning Agency.

7. The Applicant and Property Owner shall agree in writing to these conditions of approval within 30 days of the Planning Agency’s approval.

5.5.1.b
Packet Pg. 681 Attachment: Attachment B – Proposed Resolution of Approval (PUP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 7 ends

1660920.1

8. The conditions of Project approval set forth herein include certain development impact fees and other exactions. Pursuant to Government Code §66020(d), these conditions constitute written notice of the amount of such fees, and/or exactions. The Applicant is hereby notified that the 90-day protest period in which the Applicant may protest the fees, dedications, reservation, or exactions imposed on this Project through the Conditions of Approval, commencing from the date of approval of the Project, has begun.

9. Pursuant to City Council Resolution No. 2017-07-11-2, the Applicant shall reimburse the City for any outstanding staff time spent on the processing of this Permit within 60 days of the Planning Agency’s approval.

10. This Permit shall expire and be of no further force or effect if the Permit is not implemented within two years from March 22, 2022.

11. Within 48 hours from project approval, the Applicant shall submit to the City a check in the amount of $50.00, made payable to the Orange County ClerkRecorder, for filing the Notice of Exemption.

Planning Division

12. If at any time in the future the Community Development Director determines, in his or her sole discretion, that an updated parking and circulation study is necessary to address parking and/or circulation insufficiencies, issues, complaints, or problems relative to ensuring adequate parking and circulation on the subject property in connection with this Permit, the Applicant shall, at its sole cost and expense, be responsible for the cost of a parking and circulation study prepared by a licensed consultant selected by the City. The Applicant shall, at its sole cost and expense, be responsible for implementation of any reasonable mitigation measures deemed appropriate by the Community Development Director related to such impacts based on the findings of such study.

PASSED, APPROVED, AND ADOPTED this 22nd day of March, 2022. ________________________________

DAVE WHEELER, CHAIR
ATTEST:
______________________________________

MELISSA AU-YEUNG, CITY CLERK

5.5.1.b
Packet Pg. 682 Attachment: Attachment B – Proposed Resolution of Approval (PUP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Resolution No. PA2022-

Page 8 ends

1660920.1

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss

CITY OF LAGUNA HILLS )
I, Melissa Au-Yeung, City Clerk of the City of Laguna Hills, California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of Resolution No. PA2022-X-X adopted by the Planning Agency of the City of Laguna Hills, California, at a Regular Meeting thereof held on the 22nd day of March, 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
_____________________________________

MELISSA AU-YEUNG, CITY CLERK

5.5.1.b
Packet Pg. 683 Attachment: Attachment B – Proposed Resolution of Approval (PUP) (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) - 1 -
January 18, 2022
Jay S. Wuu
Senior Planner
Community Development Department
City of Laguna Hills
24035 El Toro Road, Laguna Hills, CA 92653
Project Name: Honali Plaza Transformation
Project Address: 24721 – 24781 Alicia Parkway: Honali Plaza Subject: Letter of Justification
USE-0027-2020 (SDPM/CUP-PUP) HONALI PLAZA

COMPLETENESS REVIEW
Mr. Wuu:

The proposed project is the renovation and transformation of an existing shopping center built in the 1970’s. As a part of the proposed upgrades, the following items shall be a part of the project:

A Joint Parking Use Permit is proposed and an updated parking study for the entire center has been conducted based on current uses.

1. The updated parking study was conducted prior to the Covid pandemic, Nov. 14, 2019 and reflects accurate peak demands. Based on the attached table 3, mid-day peak illustrates only 88% of capacity. See parking Matrix.

2. The proposed changes shall allow for more efficient layout and driveway flows around the center together with new wayfinding signs.

3. The findings for the joint parking use permit satisfy the city of Laguna Hills required parking for a multi-tenant shopping center.

A Site Development Permit is proposed and shall be consistent with the land use elements of the city’s general plan. This renovation shall enhance an existing commercial center and maintain existing compatible uses of the neighborhood mixed use designation.

1. The findings for the SDP satisfy the pedestrian access to the site with improved walkability from adjacent properties and within the shopping center by providing accessible walkways, crossing paths, ramps, and visual wayfinding signs.

2. By providing the upgrades with the architecture style, enhanced landscaping, new lighting, and new outdoor lounge, the project aligns with the Laguna Hills Alicia Gateway Opportunity Area of the general plan.

3. The addition of the courtyard encourages more eating establishments and social interaction, including pedestrian activity within the shopping center which aligns with the goals of the LU-1 Mixed Use designation of the city.

Ownership has operated and maintained the shopping center since its inception and shall continue to do so into the far future. The proposed architecture theme shall incorporate a new more contemporary color scheme with smooth stucco finishes and clean lines with updated metal cornices, stone accents, and

5.5.1.c
Packet Pg. 684 Attachment: Attachment C – Letter of Justification (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) GB Architecture
- 2 -
integral color aluminum storefront glazing systems throughout. The proposed improvements shall apply to all existing 6 buildings for consistency and creates a unifying aesthetic for the center.

The buildings shall receive new rooftop equipment screens to meet the city’s ordinance. Trash enclosures shall be upgraded with new covers and meet the city’s current standards.

The landscape shall be remodeled and upgraded including accents in key areas. A new courtyard / lounge is proposed and is an integral part of the landscape renovation.

In addition to these improvements, the Wendy’s building will also be undergoing a remodel of their building located on the Eastern side of the property along Alicia Pkwy. The Wendy’s operator will perform the work, and we will work closely with them to ensure their remodel is of appropriately scaled architecture and design.

If you have any questions or concerns, please call me.

Sincerely,
Rick Guina, Architect
GB Architecture
Tel: (714) 486-3318
Email: [email protected]
Copy: Dave Clark, Alicia Center Company
Michael Ramming, Alicia Center Company
ATTACHMENTS:

Exhibit: Parking Study Matrix

5.5.1.c
Packet Pg. 685 Attachment: Attachment C – Letter of Justification (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) GB Architecture
-3-

5.5.1.c
Packet Pg. 686 Attachment: Attachment C – Letter of Justification (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) GB Architecture
-4-

5.5.1.c
Packet Pg. 687 Attachment: Attachment C – Letter of Justification (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) GB Architecture
-5-

5.5.1.c
Packet Pg. 688 Attachment: Attachment C – Letter of Justification (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.d
Packet Pg. 689 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))

5.5.1.d
Packet Pg. 690 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))
(;,67,1*0(&+ ),(/'9(5,)<
(;,67,1*0(&+ ),(/'9(5,)<
(;,67,1*0(&+

),(/'9(5,)<
(;,67,1*0(&+ ),(/'9(5,)<
(;,67,1*0(&+ ),(/'9(5,)<
(;,67,1*0(&+ ),(/'9(5,)<
(;,67,1*0(&+ ),(/'9(5,)<
(;,67,1*0(&+ ),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)
(
0(&+
9,)

(

0(&+
9,)
(;,67,1*0(&+
),(/'9(5,)<

(

0(&+
9,)
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)
(;,67,1*0(&+
),(/'9(5,)<

(

0(&+
9,)

(

0(&+
9,)
(;,67,1*0(&+ ),(/'9(5,)<

(

0(&+
9,)
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+),(/'9(5,)<

(

0(&+
9,)
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<

(

0(&+
9,)

(

0(&+
9,)
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
6&5((1%5$&,1*
(;,67,1*522)723
0(&+$1,&$/81,76 (;,67,1*522)723
0(&+$1,&$/81,76
(;,67,1*522)7230(&+$1,&$/81,76
(;,67,1*522)723
0(&+$1,&$/81,76
(;,67,1*522)723
0(&+$1,&$/81,76
6&5((1%5$&,1*
6&5((1%5$&,1*
6&5((1%5$&,1*
6&5((1%5$&,1*
6&5((1%5$&,1*
$

$

$

$

1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
$/,&,$3$5.:$<
+21$9(18(
6$1',(*2

)5((:$< 2))5$03
123$5.,1* 12
3$5.,1*






&216758&7,2167$*,1*
$1'0$7(5,$/6725$*($5($

&216758&7,2167$*,1*
$1'0$7(5,$/6725$*($5($

&216758&7,2167$*,1*
$1'0$7(5,$/6725$*($5($

(;,67,1*
%8,/',1*)
(;,67,1*
%8,/',1*(
(;,67,1*
(;,67,1*
%8,/',1*&
%8,/',1*'
(;,67,1*
%8,/',1*% (;,67,1*
%8,/',1*$
/,1(2)6,*+76,7(3/$1
6&$/(
 

$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$ 1257+

5.5.1.d
Packet Pg. 691 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))




0(&+$1,&$/
(48,30(17
%8,/',1*%
&/
+21$9(
6,'(:$/.
'5,9(:$<
0(&+$1,&$/
6&5((16(($$
&/
67$1'$5'/,1(
2)6,*+7
0$;,080(<( 527$7,21 6+((7$


9,)




0(&+$1,&$/
(48,30(17
%8,/',1*( &/
+21$9(
6,'(:$/.
67$1'$5'/,1(
2)6,*+7
0$;,080(<( 527$7,21 6+((7$
0(&+$1,&$/
6&5((16(($$


9,)




0(&+$1,&$/
(48,30(17
%8,/',1*( &/
+21$9(
6,'(:$/.
67$1'$5'/,1(
2)6,*+7
0$;,080(<( 527$7,21 6+((7$
0(&+$1,&$/
6&5((16(($$


9,)




0(&+$1,&$/
6&5((16(($$
0(&+$1,&$/
(48,30(17
%8,/',1*)
&/
+21$9(
6,'(:$/.
67$1'$5'/,1(
2)6,*+7
0$;,080(<( 527$7,21
6+((7$


9,)




0(&+$1,&$/
(48,30(17
%8,/',1*'
&/
$/,&,$3.:<
3$5.,1*/27
3$5.,1*/27
6,'(:$/. 6,'(:$/.
0(&+$1,&$/
6&5((16(($$ &/
67$1'$5'/,1(
2)6,*+7
0$;,080(<( 527$7,21
6+((7$


9,)
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
/,1(2)6,*+7
6&$/(
 

/,1(2)6,*+7
6&$/(
 

/,1(2)6,*+7
6&$/(
 

/,1(2)6,*+7
6&$/(
 

$

5.5.1.d
Packet Pg. 692 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))
1(:&21&5(7(
6,'(:$/.
1(:*5$66/$:1
1(:*5$66
/$:1
1(:/$5*(
75((3/$17(5
67$03(' &2/25('&21&5(7(
287'225/281*($5($
%8,/',1*&
1(:3/$17(5%2;(61(:/$5*(3276
6((/&
1(:326780%5(//$&$123<
1(:*5$66/$:1
1(:&21&5(7(
6,'(:$/.
&21&5(7(67(36
1(:$&&(173/$17(56
1(:326780%5(//$&$123<
1(:$&&(66,%/(3$5.,1*67$//6
%8,/',1*'
&+,/'5(1
63/$<$5($
$1'6($7,1*
6((/$1'6&$3('5$:,1*6 123$5.,1*
12 3$5.,1*





$
$






























 




 



1(:3$5.,1*67$//6

0$;6/23($1<
',5(&7,21

1(:7581&$7(''20(3$9(56
$&5266(175<

 
 

6((6+((7$
6((6+((7$


(;,67,1*3$5.,1*
67$//6
1(:6/23('&21&5(7(
6,'(:$/.:,7+0$;&52666/23(
0$;6/23(
1(:/(9(//$1',1*
:,7+0$;6/23(
,1$1<',5(&7,21
1(:$&&(66,%/(0,1
:,'(:$/.0$;
6/23(,1$1<',5(&7,21



1(:/$5*(3276
6((/&

 
 

 




 










&2558*$7('0(7$/
522),1*
3$,17('67((/)5$0(
:,7+[3$,17('75(//,6
3$,17('67((/)5$0(
720$7&+%8,/',1*
&$123< 



35(6685(75($7('
[:22'75(//,6
[67((/&&+$11(/
3(5,0(7(5)5$0($%29(





:[67((/3267
3$,17('67((/)5$0(
:,7+[3$,17('75(//,6
3$,17('67((/)5$0(
720$7&+%8,/',1*
&$123<





&2558*$7('0(7$/
522),1*
12 3$5.,1*
9$1
$&&(66,%/(
$&&(66,%/(3$5.,1*.(<127(6
 0,1,080+,*+:+,7(/(77(56
 ',0(16,2172&(17(5/,1(2)675,3(
 3$9(0(176<0%2/3(5&%&6(&7,216%%7+(3$5.,1* 63$&(6+$//%(0$5.(':,7+$1,17(51$7,21$/6<0%2/2)$&&(66,%,/,7<&203/<,1*:,7+6(&7,21%,1:+,7(21$%/8(%$&.*5281'$ 0,1,0802):,'(%<,1&+(6+,*+7+(&(17(5/,1(2)7+(,17(51$7,21$/ 6<0%2/2)$&&(66,%,/,7<6+$//%($0$;,0802),1&+(6)5207+(&(17(5/,1(2)7+(3$5.,1*63$&(,766,'(63$5$//(/727+(/(1*+72)7+( 3$5.,1*63$&($1',76/2:(5&251(5$725/2:(56,'($/,*1(':7,+7+((1'2)7+(3$5.,1*63$&(/(1*7+  675,3(672%(3$,17('$&2/25&2175$67,1*:3$5.,1*685)$&(35()(5$%/< %/8(25:+,7(
 /2$',1* 81/2$',1*$&&(66$,6/(%25'(5
3$,17('%/8( :+((/6723
 648$5(,1&+$&&(66,%,/,7<6,*13(5&%&6(&7,21%$1' '(7$,/6%$$1'&$
 3529,'(9$1$&&(66,%/(63$&(:+(5(5(48,5('

5()(572&%&6(&7,21%

1(:7581&$7(''20(3$9(56$&5266(175<
1(:$&&(66,%/(67$//
0$;6/23($1<',5(&7,21
1(:)/86+&85%

7<3

0,17<3 
0,1#
7<3,&$/
3$5.,1*67$//


0,1#
9$1
$&&(66,%/(
3$5.,1*67$//


7<3

0$; 2&7<3
    7<3
3('(675,$15287(
 


0,1

0,17<3









&2558*$7('0(7$/
522),1*3$,17('67((/)5$0(
:,7+[3$,17('75(//,6
3$,17('67((/)5$0(
720$7&+%8,/',1*
&$123<
5(48,5(0(17127(6

+(,*+72)6,*1,16,'(:$/.253('(675,$1$5($66+$//%(0,1$%29( 3$7+2)75$9(/
6(7%$&.2)6,*16+$//%()52067$1'$5'&85%$1')520$52//(' &85%
6,*160$<%(02817('21(;,67,1*3267625%8,/',1*,)&(17(5/,1(2)6,*1 ,612025(7+$1)520('*(2)52$':$<
6,*16+$//%(02817(')$&,1*7+(',5(&7,212)75$9(/ 6((127(
6((127( 127( 127(
6,*102817,1*
176
9$1$&&(66,%/(
5()/(&725,=('6,*1
&216758&7('2)325&(/$,167((/:,7+%($'('7(;725
(48$/
5$',86
%25'(5 /(*(1':+,7(

5(7525()/(&7,9(

%$&.*5281'%/8(

5(7525()/(&7,9(

0,1727232)),1,6+
3$5.,1*685)$&(
0,1)25)5((
67$1',1*$73$7+2)
75$9(/21/<
3$5.,1*
21/<
0,1,080
),1(
3$5.,1*
21/<
0,1,080
),1(



$5($2)6,*172%($
0,12)64,1&+(6
127(
6,*172%(&(17(5('$77+(,17(5,25(1'2)3$5.,1*63$&( $&&(66,%/(3$5.,1*63$&(6,*1$*(
126&$/(
$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
(1/$5*('3/$=$3/$1
6&$/(
 

1257+
(1/$5*('75(//,63/$17<3($
6&$/(
 

75(//,6(/(9$7,2167<3($
6&$/(
 

(1/$5*('75(//,63/$17<3(%
6&$/(
 

6,'(
$&&(66,%/(3$5.,1*
6&$/(
 
 $
)5217
75(//,6(/(9$7,2167<3(%
6&$/(
 

)5217
%
&
)5217

5.5.1.d
Packet Pg. 693 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))



 

 
 


1(:7$//&08%/2&.:$//
6&5((1)25*52&(5<&$576
5(3/$&($1'83*5$'((;,67,1*
6725()5217*/$=,1*6(((/(9$7,216



 
 




 


 
 
 








 
 
 


 
 









(;,67,1*
&29(5(':$/.:$<

 


 




 


 


 
 (;,67,1* &29(5(':$/.:$< (;,67,1* &29(5(':$/.:$<
(;,67,1*
%8,/',1*$
1(:$&&(17&$123<$%29(1(:6721(9(1((56(((/(9$7,216 1(:)855,1*$5281'
(;,67,1*&2/8016
%8,/',1*$
(;,67,1*522)
1(:522) 1(:522)

0,1
&/($57<3

2&
7<3

2&
7<3
1(:522)3$5$3(71(:
7$//522)7230(&+$1,&$/6&5((10(7$/
3$,17('720$7&+%8,/',1*
6(('(7$,/$$
6&5((1%5$&,1*
(;,67,1*522)723
0(&+$1,&$/81,76
'(02(;,67,1*522)
29(5+$1*$1')$6&,$
1(:)/$7522)$1'
3$5$3(7$%29((;,67,1*522))5$0,1*
(;,67,1*0(&+),(/'9(5,)<
1(:$&&(17&$123<


1(:522)
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+),(/'9(5,)<
(;,67,1*0(&+),(/'9(5,)<(;,67,1*0(&+),(/'9(5,)<
(;,67,1*0(&+),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+),(/'9(5,)<
$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
6&$/(
 

1257+
352326('%8,/',1*522)3/$1$ 352326('%8,/',1*)/2253/$1$ 6&$/(
 


5.5.1.d
Packet Pg. 694 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))




(;,67,1*63$1,6+7,/(522)(;,67,1*678&&23$5$3(7(;,67,1*6725()5217 6<67(0
(;,67,1*678&&2
&29(5('&08%/2&.&2/8016
(;,67,1*678&&2:$//






(;,67,1*678&&2
62)),7






(;,67,1*678&&2:$//

 



(;,67,1*678&&2:$//




(;,67,1*678&&2:$//


$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
)5217(/(9$7,21
6&$/(
 

/()7(/(9$7,21
6&$/(
 

5,*+7(/(9$7,21
6&$/(
 

(;,67,1*%8,/',1*$(/(9$7,216
5($5(/(9$7,21
6&$/(
 


5.5.1.d
Packet Pg. 695 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))

5.5.1.d
Packet Pg. 696 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))
1(:522) 1(:522) 1(:522)
%8,/',1*%
(;,67,1*522)
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
1(:522)3$5$3(7
'(02(;,67,1*522)
29(5+$1*$1')$6&,$
1(:)/$7522)$1'3$5$3(7$%29((;,67,1*522))5$0,1*
6&5((1%5$&,1*
(;,67,1*522)723
0(&+$1,&$/81,76
(;,67,1*0(&+),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)< (;,67,1*0(&+
),(/'9(5,)<

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,) 
0,1
&/($57<3

 












 
 













 



 


 


 




 


 




 




 












 
 





 (;,67,1*%8,/',1*%
(;,67,1*&29(5(':$/.:$<
1(:6721(9(1((56(((/(9$7,216 1(:)855,1*$5281'
(;,67,1*&2/8016
$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$ 1257+
352326('%8,/',1*522)3/$1%
6&$/(
 

352326('%8,/',1*)/2253/$1%
6&$/(
 

522)7230(&+$1,&$/6&5((16&$/(
 
),/(

3529,'(67((/&$3$778%(
67((/32673(56758&785$/35,0($1'
3$,173$,17('0(7$/'(&.,1*
78%(67((/3(5
6758&785$/$7
21&(17(535,0($1'3$,17
5281'78%(67((/%5$&(
3(56758&785$/$7
21
&(17(535,0($1'3$,17
648$5(%$6(3/$7(3(5
6758&785$/35,0($1'
3$,17
+25,=217$/81,67587
*$/9$1,=('),1,6+35,0($1'
3$,175$',86('%2/73,3(
&211(&7256
648$5(%$6(3/$7(3(5
6758&785$/35,0($1'
3$,17
1(:&/$66
$
%8,/78352//('522),1*%<&/,(17(;,67,1*3/<:22'522) 6+($7+,1*
;:22'%/2&.,1*:,7+
+8+$1*(563(5
6758&785$/


&2/801+(,*+7

0$;
:$7(53522)%227
3(5522),1*0$18)$&785(5


),(/'9(5,)<9$5,(6
:$7(53522)%227 3(5522),1* 0$18)$&785(5
+25,=217$/81,67587
*$/9$1,=('),1,6+35,0($1'
3$,17
5$',86('%2/73,3(
&211(&7256

),(/'9(5,)<

&217,182860(7$/
/$1*/()$67(172
%27+6&5((1$1'+25,=217$/%5$&(
&217,182860(7$/
/$1*/()$67(172
%27+6&5((1$1'+25,=217$/%5$&(
$

5.5.1.d
Packet Pg. 697 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))






(;,67,1*63$1,6+
7,/(522)
(;,67,1*522)3$5$3(7%(<21'(;,67,1*678&&2
&29(5('&08%/2&.&2/8016
(;,67,1*6725()5217
6<67(0
(;,67,1*678&&2
62)),7:,7+6725(6,*1$*(
(;,67,1*678&&2
62)),7








(;,67,1*63$1,6+7,/(522) (;,67,1*678&&2:$//(;,67,1*678&&2 &29(5('&08%/2&.&2/8016
(;,67,1*678&&2
62)),7












(;,67,1*678&&2:$//
$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
)5217(/(9$7,21
6&$/(
 

/()7(/(9$7,21
6&$/(
 

5,*+7(/(9$7,21
6&$/(
 

(;,67,1*%8,/',1*%(/(9$7,216
5($5(/(9$7,21
6&$/(
 


5.5.1.d
Packet Pg. 698 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))

5.5.1.d
Packet Pg. 699 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))





 
 


 


 











 









 


 
 










9,)











 






 














 




 













(;,67,1*%8,/',1*&
(;,67,1*%8,/',1*'


9,)




 








 

%8,/',1*&
(;,67,1*522)
%8,/',1*'
(;,67,1*522)
1(:522)1(:522) 1(:522)
1(:522) 1(:522) 1(:522)
(;,67,1*0(&+
),(/'9(5,)<

(

0(&+
9,)
(;,67,1*0(&+),(/'9(5,)<
(;,67,1*0(&+),(/'9(5,)<

(

0(&+
9,)

(

0(&+
9,)

(

0(&+
9,)
(;,67,1*0(&+),(/'9(5,)<

(

0(&+
9,)

(

0(&+
9,)
(;,67,1*0(&+),(/'9(5,)<

(

0(&+
9,)

0,1
&/($57<3

2&
7<3

2&
7<3
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
6&5((1%5$&,1*
(;,67,1*522)723
0(&+$1,&$/81,76
1(:)/$7522)$1'3$5$3(7$%29((;,67,1*522))5$0,1*'(02(;,67,1*522) 29(5+$1*$1')$6&,$
1(:522)3$5$3(7
$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$ 1257+
352326('%8,/',1*522)3/$1&'
6&$/(
 

352326('%8,/',1*)/2253/$1&'
6&$/(
 


5.5.1.d
Packet Pg. 700 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))






(;,67,1*63$1,6+
7,/(522)
(;,67,1*522)
3$5$3(7%(<21'
(;,67,1*678&&2
&29(5('&08%/2&.&2/8016
(;,67,1*678&&2
62)),7
(;,67,1*6725()5217
6<67(0






(;,67,1*678&&2
62)),7:,7+6725(6,*1$*(












(;,67,1*63$1,6+
7,/(522)
(;,67,1*522)3$5$3(7%(<21'(;,67,1*678&&2
&29(5('&08%/2&.&2/8016
(;,67,1*678&&2
62)),7
(;,67,1*6725()5217
6<67(0
(;,67,1*678&&2
62)),7:,7+6725(6,*1$*(








(;,67,1*63$1,6+
7,/(522)
(;,67,1*678&&2
&29(5('&08%/2&.&2/8016
(;,67,1*678&&2
62)),7
(;,67,1*678&&2:$//
(;,67,1*678&&2
62)),7:,7+6725(6,*1$*(
(;,67,1*678&&2:$//








(;,67,1*63$1,6+
7,/(522)
(;,67,1*678&&2
&29(5('&08%/2&.&2/8016
(;,67,1*678&&2:$//
$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
)5217(/(9$7,21
6&$/(
 

/()7(/(9$7,21
6&$/(
 

5,*+7(/(9$7,21
6&$/(
 

(;,67,1*&'(/(9$7,216
5($5(/(9$7,21
6&$/(
 


5.5.1.d
Packet Pg. 701 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))

5.5.1.d
Packet Pg. 702 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))






 






 






 
 






 


 












 
 (;,67,1*%8,/',1*(

 




 

(;,67,1*%8,/',1*)





 


 




 
 


 
 








 


 







 


 
 


 








 




 







 


 

1(:522)
1(:522) 1(:522) 1(:522)
1(:522)
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/
3$,17('720$7&+%8,/',1*
6(('(7$,/$$
1(:522)3$5$3(7
6&5((1%5$&,1*
(;,67,1*522)723
0(&+$1,&$/81,76
(;,67,1*0(&+),(/'9(5,)<

(

0(&+
9,)

(

0(&+
9,)

0,1

2&
&/($57<3
7<3

2&
7<3
'(02(;,67,1*522)
29(5+$1*$1')$6&,$
1(:)/$7522)$1'
3$5$3(7$%29((;,67,1*522))5$0,1*
),(/'9(5,)<
(;,67,1*0(&+
9,)
0(&+

(

9,)
0(&+

(
%8,/',1*)
(;,67,1*522)
1(:522) 1(:522)
1(:522)1(:522)
%8,/',1*(
(;,67,1*522)
(;,67,1*0(&+),(/'9(5,)<
(;,67,1*0(&+
),(/'9(5,)<
(;,67,1*0(&+),(/'9(5,)<

(

0(&+
9,)
(;,67,1*0(&+
),(/'9(5,)<
'(02(;,67,1*522)
29(5+$1*$1')$6&,$
1(:)/$7522)$1'3$5$3(7$%29((;,67,1*522))5$0,1*
1(:522)3$5$3(7

0,1
&/($57<3

2&
7<3

2&
7<3 (;,67,1*522)723 0(&+$1,&$/81,76
1(:
7$//522)7230(&+$1,&$/6&5((10(7$/3$,17('720$7&+%8,/',1* 6(('(7$,/$$
6&5((1%5$&,1*
$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
352326('%8,/',1*522)3/$1(
6&$/(
 

352326('%8,/',1*)/2253/$1(
6&$/(
 

352326('%8,/',1*522)3/$1)
6&$/(
 

352326('%8,/',1*)/2253/$1)
6&$/(
 


5.5.1.d
Packet Pg. 703 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))










(;,67,1*63$1,6+
7,/(522)
(;,67,1*522)3$5$3(7%(<21'(;,67,1*678&&2
&29(5('&08%/2&.&2/8016
(;,67,1*678&&2
62)),7
(;,67,1*6725()5217
6<67(0
(;,67,1*678&&2
62)),7:,7+6725(6,*1$*(
























$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
)5217(/(9$7,21
6&$/(
 

/()7(/(9$7,21
6&$/(
 

5,*+7(/(9$7,21
6&$/(
 

(;,67,1*((/(9$7,216
5($5(/(9$7,21
6&$/(
 


5.5.1.d
Packet Pg. 704 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))

5.5.1.d
Packet Pg. 705 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))








(;,67,1*63$1,6+
7,/(522)
(;,67,1*522)3$5$3(7%(<21'(;,67,1*678&&2
&29(5('&08%/2&.&2/8016
(;,67,1*678&&2
62)),7
(;,67,1*6725()5217
6<67(0
(;,67,1*678&&2
62)),7:,7+6725(6,*1$*(
















(;,67,1*678&&2:$//








$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
)5217(/(9$7,21
6&$/(
 

/()7(/(9$7,21
6&$/(
 

5($5(/(9$7,21
6&$/(
 

(;,67,1*)(/(9$7,216
5,*+7(/(9$7,21
6&$/(
 


5.5.1.d
Packet Pg. 706 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))

5.5.1.d
Packet Pg. 707 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))





(
75$6+
(1&/2685(





1 35
0(7$/






(
75$6+
(1&/2685(

(
&21&5(7($3521

 

(((((((



555





5


5555








 

(((((((




1 350(7$/ 









1 75$6+
(1&/2685(

1 &21&5(7($3521
<'%,1 <'%,1 *$/
 

$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
352326('%8,/',1*($1'&75$6+(1&/2685(6
352326('522)3/$1
522).(<127(6
5 [0(7$/%($06$73(5,0(7(5$1'0,'32,17$66+2:15 0(7$/522)720$7&+(;,67,1*&2558*$7('3$1(/%<6(0&225(48$/ 8/),5(5(6,67$1&(5
3/$1*(1(5$/127(6
*(1(5$/&2175$&725729(5,)<$//(;,67,1*&21',7,216,17+(),(/'35,2572 &200(1&,1*:25.&+(&.:,7+2:1(5$1'$5&+,7(&75(*$5',1*$1< ',6&5(3$1&,(6%()25(&200(1&,1*:25.
$//0$7(5,$/6$1'),1,6+(6720$7&+(;,67,1*$63(50,77('%<%8,/',1*&2'(6 3/$1.(<127(6
 (;,67,1*&08%/2&.:$//
 1(:&08%/2&.:$//
 (;,67,1*&85%
 1(:&85%
 1(:&21&5(7($3521$61(('('),(/'9(5,)<
 1(:648$5(78%(67((/3267)$67(172&08:$//$7 5 [0(7$/3267(0%(',172&08:$//5 [0(7$/%($0 /2&$7,2169(57,&$/
 1(:78%(67((/%($0$%29(
 1(:3,3(%2//$5'720$7&+(;,67,1*
(;,67,1*:$67(%,1

[


 1(:<$5':$67(%,1 1(:*$//21)22':$67(%,1 (;,67,1*75$6+(1&/2685(3/$1
6&$/(
 

352326('75$6+(1&/2685(3/$1
)5217
(/(9$7,21127(6
*(1(5$/&2175$&725729(5,)<:,7+2:1(5),1$/),1,6+(6$1' &2/256
(/(9$7,21.(<127(6
( (;,67,1*&08:$//3$7&+$1'3$,17( 1(:&08:$//3$7&+$1'3$,17( 1(:0(7$/32673$,17),1,6+3(52:1(5( 1(:0(7$/%($03$,17),1,6+3(52:1(5( 1(:&2558*$7('0(7$/522)3$,17),1,6+3(52:1(5( 20,7( 1(:&2558*$7('0(7$/'2253$,17),1,6+3(52:1(5( 1(:3,3(%2//$5'720$7&+(;,67,1*( (;,67,1**5$'(725(0$,1
352326('75$6+(1&/2685((/(9$7,216
6,'(
352326('75$6+(1&/2685(3/$1
)5217
352326('75$6+(1&/2685((/(9$7,216
6,'(
352326('522)3/$1
%8,/',1*&&85%$1'522)$'',7,2121/< %8,/',1*&
6&$/(
 
6&$/(
 

6&$/(
 

%8,/',1*&
%8,/',1*(
6&$/(
 

%8,/',1*(
6&$/(
 

%8,/',1*(
6&$/(
 

%8,/',1*&

5.5.1.d
Packet Pg. 708 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))





(
75$6+
(1&/2685(





1 350(7$/





(
75$6+
(1&/2685(

(
&21&5(7($3521



 

(((((((



5555






5555





 

(((((((






1 350(7$/





(
75$6+
(1&/2685(

(
&21&5(7($3521





(
75$6+
(1&/2685(
$
352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$
352326('%8,/',1*'$1')75$6+(1&/2685(6
352326('522)3/$1
522).(<127(6
5 [0(7$/%($06$73(5,0(7(5$1'0,'32,17$66+2:15 0(7$/522)720$7&+(;,67,1*&2558*$7('3$1(/%<6(0&225(48$/ 8/),5(5(6,67$1&(5
3/$1*(1(5$/127(6
*(1(5$/&2175$&725729(5,)<$//(;,67,1*&21',7,216,17+( 3/$1.(<127(6
5 [0(7$/3267(0%(',172&08:$//5 [0(7$/%($0 ),(/'35,2572
&200(1&,1*:25.&+(&.:,7+2:1(5$1'$5&+,7(&75(*$5',1*$1< ',6&5(3$1&,(6%()25(&200(1&,1*:25.
$//0$7(5,$/6$1'),1,6+(6720$7&+(;,67,1*$63(50,77('%<%8,/',1*&2'(6  (;,67,1*&08%/2&.:$//
 1(:&08%/2&.:$//
 (;,67,1*&85%
 1(:&85%
 1(:&21&5(7($3521$61(('('),(/'9(5,)<
 1(:648$5(78%(67((/3267)$67(172&08:$//$7 /2&$7,2169(57,&$/
 1(:78%(67((/%($0$%29(
 1(:3,3(%2//$5'720$7&+(;,67,1*
(;,67,1*:$67(%,1

[


 1(:<$5':$67(%,1 1(:*$//21)22':$67(%,1 (;,67,1*75$6+(1&/2685(3/$1
6&$/(
 

352326('75$6+(1&/2685(3/$1
6&$/(
 

)5217
6&$/(
 

(/(9$7,21127(6
*(1(5$/&2175$&725729(5,)<:,7+2:1(5),1$/),1,6+(6$1' &2/256
(/(9$7,21.(<127(6
( (;,67,1*&08:$//3$7&+$1'3$,17( 1(:&08:$//3$7&+$1'3$,17( 1(:0(7$/32673$,17),1,6+3(52:1(5( 1(:0(7$/%($03$,17),1,6+3(52:1(5( 1(:&2558*$7('0(7$/522)3$,17),1,6+3(52:1(5( 20,7( 1(:&2558*$7('0(7$/'2253$,17),1,6+3(52:1(5( 1(:3,3(%2//$5'720$7&+(;,67,1*( (;,67,1**5$'(725(0$,1
352326('75$6+(1&/2685((/(9$7,216
6,'(
352326('75$6+(1&/2685(3/$1
6&$/(
 

)5217
352326('75$6+(1&/2685((/(9$7,216
6&$/(
 

6,'(
6&$/(
 

352326('522)3/$1
6&$/(
 

%8,/',1*'&85%$1'522)$'',7,2121/< %8,/',1*)&85%$1'522)$'',7,2121/< %8,/',1*)
%8,/',1*' %8,/',1*)
%8,/',1*'
(;,67,1*75$6+(1&/2685(3/$1
6&$/(
 


5.5.1.d
Packet Pg. 709 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))
$/,&,$3$5.:$<
+21$9(18(
6$1',(*2

)5((:$< 2))5$03
123$5.,1* 12
3$5.,1*






&216758&7,2167$*,1*
$1'0$7(5,$/6725$*($5($

&216758&7,2167$*,1*
$1'0$7(5,$/6725$*($5($

&216758&7,2167$*,1*
$1'0$7(5,$/6725$*($5($

(;,67,1*
%8,/',1*)
(;,67,1*
%8,/',1*(
(;,67,1*
(;,67,1*
%8,/',1*&
%8,/',1*'
(;,67,1*
%8,/',1*% (;,67,1*
%8,/',1*$
&216758&7,2167$*,1*
6&$/(
 

$

352-(&7
 $/,&,$3$5.:$</$*81$+,//6&$/,)251,$
7+(+21$/O3/$=$
6(37(0%(5
$5(7$,/75$16)250$7,21)25:$50,1*721&200(5&,$/

+21$/,3/$=$ 1257+

5.5.1.d
Packet Pg. 710 Attachment: Attachment D
Plan Set (2776 : SDP No
USE
0027
2020
PUP No
USE
0084
2022 (Honali Plaza))

LIMIT OF WORK

LIMIT OF WORK LIMIT OF WORK

LIMIT OF WORK

LIMIT OF WORK

LIMIT OF WORK

LIMIT OF WORK

HON AVENUE
SAN DIEGO (5) FREEWAY OFF RAMP ALICIA PARKWAY EXISTING GAS STATION (NOT A PART)

EXISTING

RESTAURANT
(NOT A PART) BUILDING B 15,600 S.F.

BUILDING A
27,000 S.F.

BUILDING C
7,200 S.F.

BUILDING D
7,200 S.F. BUILDING F 7,200 S.F. BUILDING E 7,200 S.F. DECLARATION OF COPYRIGHT: GB ARCHITECTURE HEREBY EXPRESSLY RESERVES COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS AND DRAWINGS. THESE DOCUMENTS ARE NOT TO BE REPRODUCED, CHANGED, OR COPIED IN ANY FORM OR MANNER WITHOUT FIRST OBTAINING THE EXPRESSED WRITTEN PERMISSION AND CONSENT OF GB ARCHITECTURE NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT SAID WRITTEN CONSENT. PROJECT NO. PLAN CHECK NO. SUBMITTAL LOG DESCRIPTION FIRST PLANNING SUBMITTAL DATE APR. 15. 2020 REVISION LOG NO. REVISION DATE DATE: MAR. 10, 2020 190101 WARMINGTON COMMERCIAL

HONALI PLAZA
24761 ALICIA PARKWAY, LAGUNA HILLS, CA 92653 terra n INTEGRATION Landscape Architecture CA#5231 Planning + Design + Sustainability 143 S. Olive St. I Orange I CA I 92866 www.terrainintegration.com 714-724-9814 SECOND PLANNING SUBMITTAL AUG. 27. 2021 EXISTING SITE PLAN LC-0.0 EXISTING TREE LEGEND SYMBOL DESCRIPTION EXISTING CANOPY TREE EXISTING PALM TREE 5.5.1.d Packet Pg. 711
Attachment: Attachment D – Plan Set (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

LIMIT OF WORK

LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK

LIMIT OF WORK

LIMIT OF WORK

HON AVENUE
SAN DIEGO (5) FREEWAY OFF RAMP ALICIA PARKWAY EXISTING GAS STATION (NOT A PART)

EXISTING

RESTAURANT
(NOT A PART) BUILDING B 15,600 S.F. BUILDING A 27,000 S.F.

BUILDING C
7,200 S.F.

BUILDING D
7,200 S.F. BUILDING F 7,200 S.F. BUILDING E 7,200 S.F. DECLARATION OF COPYRIGHT: GB ARCHITECTURE HEREBY EXPRESSLY RESERVES COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS AND DRAWINGS. THESE DOCUMENTS ARE NOT TO BE REPRODUCED, CHANGED, OR COPIED IN ANY FORM OR MANNER WITHOUT FIRST OBTAINING THE EXPRESSED WRITTEN PERMISSION AND CONSENT OF GB ARCHITECTURE NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT SAID WRITTEN CONSENT. PROJECT NO. PLAN CHECK NO. SUBMITTAL LOG DESCRIPTION FIRST PLANNING SUBMITTAL DATE APR. 15. 2020 REVISION LOG NO. REVISION DATE DATE: MAR. 10, 2020 190101 WARMINGTON COMMERCIAL

HONALI PLAZA
24761 ALICIA PARKWAY, LAGUNA HILLS, CA 92653 terra n INTEGRATION Landscape Architecture CA#5231 Planning + Design + Sustainability 143 S. Olive St. I Orange I CA I 92866 www.terrainintegration.com 714-724-9814 SECOND PLANNING SUBMITTAL AUG. 27. 2021 CONCEPTUAL SITE PLANLC-1.0 NORTH 0SCALE: 1" = 30'-0" 15' 30' 60' SHADE CALCULATIONS WATER EFFICIENT LANDSCAPE NOTES · IRRIGATION PLANS FOR HONALI PLAZA SHALL ADHERE TO MWELO (AB1881) STANDARDS AND CONDITIONS INCLUDING THE CITY OF LAGUNA HILLS WATER CONSERVATION ORDINANCE · ALL LANDSCAPE SHALL BE WATERED BY A PERMANENT & AUTOMATIC IRRIGATION SYSTEM · CONTRACTOR SHALL INSTALL A WEATHER BASED SMART CONTROLLER OR USE SOIL AND/OR RAIN SENSORS · CONTROLLER SHALL BE LOCATED OUTDOORS ONSITE UNDER APPROVAL OF OWNER IN A LOCKING VANDAL RESISTANT ENCLOSURE · ALL SHRUBS & GROUNDCOVER SHALL BE IRRIGATED WITH A LOW VOLUME DRIP SYSTEM AND/OR HIGH EFFICIENCY NOZZLES. · TREES SHALL BE WATERED BY DEEP ROOT WATERING SYSTEMS ON SEPARATE VALVES FROM SHRUBS · EACH HYDROZONE SHALL HAVE PLANT MATERIALS WITH SIMILAR WATER USE AND WATERED SEPARATELY THAN DIFFERING WATER USES · A SEPARATE DESIGNATED WATER METER (OR SUB METER) SHALL BE INSTALLED OR UTILIZED SPECIFICALLY FOR IRRIGATION PURPOSES DEVELOPMENT STANDARDS CALCULATIONS ITEM STANDARD PROPOSED LOT SIZE 10,000 S.F. MIN, 347,499 S.F. LOT COVERAGE 50% MAX. 20% (71,400 S.F.) LANDSCAPE COVERAGE 15% MIN. 15 % (54,013 S.F.) TOTAL PARKING STALLS 388 1 TREE PER 6 PARKING STALLS 65 89 RENOVATED LANDSCAPE 43,327 S.F. LANDSCAPE REMOVED 787 S.F. ADDED LANDSCAPE 5,000 S.F. SYMBOL ITEM REQUIRED PROPOSED PARKING SQUARE FOOTAGE 61,525 S.F. 5 YEAR MATURITY SHADE PERCENTAGE 40% 30% SHADE RADIUS OF MATURE CANOPY CONCEPTUAL LANDSCAPE LEGEND EXISTING & NEW SITE TREES EXISTING CUPANIOPSIS ANACARDIOIDES AND FICUS RUBIGINOSA -OPTIONS TO BE REPLACED WITH: 24" - 36" BOX CERCIDIUM "DESERT MUSEUM'' DESERT MUSEUM PALO VERDE LOW GLEDITSIA TRICANTHOS 'THORNLESS' HONEY LOCUST TREE MED QUERCUS TOMENTELLA ISLAND OAK LOW RHUS LANCEA AFRICAN SUMAC LOW EXISTING EUCALYPTUS CAMALDULENSIS RIVER RED GUM EXISTING PINUS PINE EXISTING PYRUS KAWAKMII EVERGREEN PEAR EXISTING SYAGRUS ROMANZOFFIANA QUEEN PALM NEW SYAGRUS ROMANZOFFIANA QUEEN PALM MED 15' BTH +/- PARKING LOT & SCREEN TREE 24"-36" BOX CUPANIOPSIS ANACARDIOIDES CARROTWOOD MED QUERCUS TOMENTELLA ISLAND OAK LOW COURTYARD ACCENT TREE EUCALYPTUS PULVERULENTA BABY BLUE EUCALYPTUS LOW FEIJOA SELLOWIANA PINEAPPLE GUAVA LOW COURTYARD SPECIMEN TREE OLEA EUROPAEA 'SWAN HILL' FRUITLESS OLIVE LOW COURTYARD PLANTER DRACAENA DRACO DRAGON TREE LOW OLEA 'LITTLE OLLIE' LITTLE OLLIE OLIVE LOW EXISTING SHRUB RHAPHIOLEPIS INDICA INDIAN HAWTHORNE ACCENT SHRUB AGAVE SPP. AGAVE LOW DIANELLA TASMANICA VARIEGATA FLAX LILY MED MUHLENBERGIA CAPILLARIS GULF MUHLY LOW PHORMIUM 'DUET' DWARF VARIEGATED FLAX MED NEW SHRUB (TO REPLACE ALL TURF AREAS) MEDIUM/LARGE HETEROMELES ARBUTIFOLIA TOYON LOW OLEA EUROPAEA "LITTLE OLIVE' LITTLE OLLIE OLIVE LOW PITTOSPORUM VARIEGATA VARIEGATED PITTOSPORUM MED ROSEMARINUS TUSCAN BLUE TUSCAN BLUE ROSEMARY LOW SMALL CISTUS SKANBERGII PINK ROCKROSE LOW ERIGERON KARVINSKIANUS SANTA BARBARA DAISY LOW GREVILLEA 'LITTLE JOHN' DWARF BOTTLEBRUSH MED LAVANDULA 'PROVENCE' PROVENCE LAVENDER LOW GROUNDCOVER AEONIUM URBICUM SALAD BOWL LOW BOUGAINVILLEA SPP. BOUGAINVILLEA LOW FESTUCA GLAUCA BLUE FESCUE LOW FRAGERIA CALIFORNICA CALIFORNIA STRAWBERRY LOW ROSMARINU 'HUNTINGTON CARPET' HUNTINGTON CARPET LOW SYMBOL BOTANICAL NAME COMMON NAME WUCOLS SIZE COURTYARD DESIGN SEE SHEET LC-2.0 EXISTING RHUS LANCEA EXISTING ESTABLISHED TREES AND SHRUBS TO REMAIN FOR SCREENING EXISTING TURF SHALL BE REPLACED WITH NEW LOW WATER LANDSCAPE TYPICAL FOR ALL LANDSCAPE ALONG HON AVENUE NOT EXISTING (2) NEW EVERGREEN TREES PROPOSED EXISTING ESTABLISHED TREES AND SHRUBS TO REMAIN FOR SCREENING NEW TREES ADDED FOR SCREENING AS REQUESTED BY CITY 5.5.1.d Packet Pg. 712
Attachment: Attachment D – Plan Set (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) BUILDING C DECLARATION OF COPYRIGHT: GB ARCHITECTURE HEREBY EXPRESSLY RESERVES COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS AND DRAWINGS. THESE DOCUMENTS ARE NOT TO BE REPRODUCED, CHANGED, OR COPIED IN ANY FORM OR MANNER WITHOUT FIRST OBTAINING THE EXPRESSED WRITTEN PERMISSION AND CONSENT OF GB ARCHITECTURE NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT SAID WRITTEN CONSENT. PROJECT NO. PLAN CHECK NO. SUBMITTAL LOG DESCRIPTION FIRST PLANNING SUBMITTAL DATE APR. 15. 2020 REVISION LOG NO. REVISION DATE DATE: MAR. 10, 2020 190101 WARMINGTON COMMERCIAL

HONALI PLAZA
24761 ALICIA PARKWAY, LAGUNA HILLS, CA 92653 terra n INTEGRATION Landscape Architecture CA#5231 Planning + Design + Sustainability 143 S. Olive St. I Orange I CA I 92866 www.terrainintegration.com 714-724-9814 SECOND PLANNING SUBMITTAL AUG. 27. 2021 CONCEPTUAL COURTYARD PLAN LC-2.0 NORTH 0SCALE: 1/8" = 1'-0" 4' 8' 16' ALICIA PARKWAY HON AVENUE SAN DIEGO (5) FREEWAY OFF RAMPNEW COURTYARD 12 8 2 6 17 4 8 5 4 3 29 2425 9 5 12 10 10 12 4 1515 10 8 24 23 14 13 5 10 6 11 1 10 TRASH TRASH 9 NEW TRASH (N)(N) 4 2 DEMO TRASH TRASH TRASH TRASH TRASH TRASH NEW SIDEWALK RAMP (N)ACCESSIBLE CROSS WALK (N)ACCESSIBLE CROSS WALK (N)ACCESSIBLE CROSS WALK (N)ACCESSIBLE CROSS WALK NEW SIDEWALK RAMP (N)ACCESSIBLE CROSS WALK
(N)ACCESSIBLE CROSS WALK RE-STRIPE THIS SECTION RE-STRIPE THIS SECTION RE-STRIPE THIS SECTION ADD 1 STALL RE-STRIPE THIS SECTION RE-STRIPE THIS SECTION (N)ACCESSIBLE

SIDEWALK RE-STRIPE THIS SECTION

RE-STRIPE THIS SECTION

EXISTING SIDEWALK

EXISTING
GRASS
LAWN

ADJUST PLANTERS

RE-STRIPE THIS SECTION
RE-STRIPE THIS SECTION LED LED LEDLED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED LED COURTYARD LOCATION ALICIA PARKWAY HON AVENUE SAN DIEGO FREEWAY OFF RAMP SEE LC-1.0 FOR CONCEPTUAL PLANTING LEGEND SEE LC-3.0 FOR PLANT IMAGES COURTYARD SITE AMENITIES INSPIRATIONAL IMAGERY 'OPAL' ROUND POTS 'CARDIF' RECTANGLE AND SQUARE POTS PLAYGROUND- BUBBLE MOUNDS PLAYGROUND- TURF TUNNEL PLAYGROUND- TURF HILL LOUNGE SHADE STRUCTURE OPTIONS PAVERS IN GRASS SEEDED CONCRETE JOINT ACCENTS UNDER AWNING SEATING AREAS LOUNGE SEATING TABLE AND CHAIR SEATING RAISED PLANTER W/ SPECIMEN TREE BOARD FORM FINISH FOR RAISED PLANTER NO MOW FESCUE BORDER 5.5.1.d Packet Pg. 713
Attachment: Attachment D – Plan Set (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) DECLARATION OF COPYRIGHT: GB ARCHITECTURE HEREBY EXPRESSLY RESERVES COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS AND DRAWINGS. THESE DOCUMENTS ARE NOT TO BE REPRODUCED, CHANGED, OR COPIED IN ANY FORM OR MANNER WITHOUT FIRST OBTAINING THE EXPRESSED WRITTEN PERMISSION AND CONSENT OF GB ARCHITECTURE NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT SAID WRITTEN CONSENT. PROJECT NO. PLAN CHECK NO. SUBMITTAL LOG DESCRIPTION FIRST PLANNING SUBMITTAL DATE APR. 15. 2020 REVISION LOG NO. REVISION DATE DATE: MAR. 10, 2020 190101 WARMINGTON COMMERCIAL

HONALI PLAZA
24761 ALICIA PARKWAY, LAGUNA HILLS, CA 92653 terra n INTEGRATION Landscape Architecture CA#5231 Planning + Design + Sustainability 143 S. Olive St. I Orange I CA I 92866 www.terrainintegration.com 714-724-9814 SECOND PLANNING SUBMITTAL AUG. 27. 2021 CONCEPTUAL PLANT IMAGES LC-3.0 DRACAENA OLIEA - IN POT FEIJOA EUCALYTPUS OLEA - MULTI TRUNK SANSEVIERIA ROSEMARINUS LOMANDRA SENECIO FISH HOOKS AGAVE DIANELLA SENECIO JACOBSONII CEANOTHUS MUHLENBERGIA CAPILLARIS PHORMIUM HETEROMELES PITTOSPORUM CISTUS ERIGERON AEONIUM URVICUM BOUGAINVILLEA CASTLISTEMON LAVANDULA FESTUCA GLAUCA FRAGERIA ROSMARINUS PROSTRATUS PLANT IMAGERY

COURTYARD

ACCENT TREE

COURTYARD

SPECIMEN TREE

COURTYARD PLANTERS ACCENT SHRUB NEW SHRUB

MED-LARGE OLEA LITTLE OLLIE

NEW SHRUB
SMALL

GROUNDCOVER CERCIDIUM
NEW TREE OPTIONS GLEDITSIA QUERCUS RHUS 5.5.1.d
Packet Pg. 714
Attachment: Attachment D – Plan Set (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 715 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) January 11, 2022
Mr. Michael Ramming

WARMINGTON PROPERTIES
3090 Pullman Street
Costa Mesa, CA 92626
Subject: The Honali Plaza Observed Parking Study, City of Laguna Hills Dear Mr. Ramming:

Introduction
RK ENGINEERING GROUP, INC. (RK) is pleased to provide this observed parking study for the Honali Plaza shopping center. The existing site is located at 24761 Alicia Parkway, in the City of Laguna Hills, California. The location map is provided in Exhibit A.

The Honali Plaza currently consists of approximately 74,202 square feet of retail, restaurant, etc. The site currently has approximately 29,520 square feet, or approximately 40% of the gross floor area, of vacant tenant space.

Based on a manual count, the shopping center provides a total of 366 available parking spaces (including 19 ADA parking spaces) in a surface lot surrounding the buildings.

Parking for the project is shared globally and non-exclusively by all tenants and visitors.

Representatives of the project are proposing to construct a courtyard (outdoor eating area) located in the parking lot adjacent to Building C. As a result, the parking lot serving the shopping center will be restriped to accommodate the courtyard and to maximize the number of parking spaces on-site. Based on a review of the proposed site plan, a total of twenty-two (22) parking spaces will be added to the parking inventory. Therefore, under future conditions, the project will provide a total of 388 available parking spaces (including 20 ADA parking spaces) that will be shared globally by tenants and visitors in a surface parking lot.

The shopping center site plan is provided in Exhibit B.

Photographs of the project site with the existing tenant and parking lot configurations are included in Appendix D.

5.5.1.e
Packet Pg. 716 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) RK 15699

Page 2 ends

A representative of the project (Mr. Michael Ramming) is proposing to lease approximately 20,000 square feet of Veterinarian Clinic located in Suite 24721A. This use may generate a higher parking demand when compared to the existing tenant mix within the site. As a result, a parking code calculation and an observed parking study is required in order to demonstrate that adequate parking is provided for the proposed tenant mix in the shopping center.

Table 1: City of Laguna Hills Parking Code Existing Uses Considering the existing use mix and assuming full tenant occupancy of the 29,520 square feet of vacancies, per the City of Laguna Hills Municipal Parking Code (Table 9-44.A Number of Parking Stalls Required) and the parking requirements for City approved projects; Honali Plaza requires a total of 454 parking spaces. The project provides a total of 388 parking spaces. As a result, the shopping center has a parking deficiency of 66 parking spaces, or 14.5 % deficient per the Municipal Parking Code.

Table 1 provides the City of Laguna Hills Municipal Parking Code (9-44.A Number of Parking Stalls Required) for the existing use mix. The City of Laguna Hills Municipal Parking Code is included in Appendix A.

Table 2: City of Laguna Hills Parking Code Proposed Uses Considering the proposed use mix and assuming full tenant occupancy of the 9,250 square feet of vacancies, per the City of Laguna Hills Municipal Parking Code (9-44.A Number of Parking Stalls Required) and the parking requirements for City approved projects; Honali Plaza requires a total of 454 parking spaces. The project provides a total of 388 parking spaces. As a result, the shopping center has a parking deficiency of 66 parking spaces, or

14.5% deficient per the Municipal Parking Code.

Considering the proposed project, the parking requirements for proposed conditions are not changing when compared to existing conditions.

Table 2 provides the City of Laguna Hills Municipal Parking Code (9-44.A Number of Parking Stalls Required) for the proposed tenant mix.

5.5.1.e
Packet Pg. 717 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) RK 15699

Page 3 ends

Parking Demand Surveys
Due to the calculated parking code deficiency per the Municipal Code, RK has been requested to prepare an observed parking study in order to determine whether adequate parking is available to accommodate the proposed use mix within the Honali Plaza. Prior to initiating the parking study, RK reviewed the parameters of the study with the City of Laguna Hills. This study follows standard engineering practice and guidelines for determining future parking demands for a neighborhood shopping center use.

The observed parking surveys were obtained during a typical Thursday, Friday, and Saturday from 7:00 AM to 10:00 PM at one (1) hour intervals. The study days are consistent with shopping center peak parking demand data published in the ITE (Institute of Transportation Engineers) Parking Generation Manual 5th Edition. The data confirms that peak parking demands at shopping centers typically peak on a Friday and Saturday.

Please see Appendix B for shopping center peak weekday and weekend parking rates published by ITE.

Hourly Observed Peak Parking Demand
Per the direction of the City of Laguna Hills, RK obtained a detailed parking survey capturing the parking demand at Honali Plaza on the following typical days from 7:00 AM to 10:00 PM at one (1) hour intervals:
 Thursday, November 14th, 2019
 Friday, November 15th, 2019
 Saturday, November 16th, 2019
A total of forty-five (45) hours of observed parking counts were collected at the shopping center. The parking surveys were conducted by an independent third party (Counts Unlimited, Inc.). The parking surveys were obtained during typical weather conditions and were completed prior to the COVID-19 Pandemic.

Representatives of Counts Unlimited, Inc. went to the project site to conduct a manual count of the number of parking spaces that serve the tenants of the Honali Plaza shopping center. Furthermore, representatives from RK (Rogier Goedecke) confirmed that there were no parking spaces being blocked by fixed objects by storage containers, shopping cart

5.5.1.e
Packet Pg. 718 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) RK 15699

Page 4 ends

racks, trash enclosures, etc. As a result, under existing conditions, there are a total of 366 parking spaces available within the study area.

Four (4) parking zones were utilized within the study area to determine the hourly parking demand for each zone. During the time of the parking survey, the number of parked vehicles was counted in each of the parking zones. Exhibit C indicates the parking zones utilized in the report. The raw data of the observed parking counts are included in Appendix C.

The parking survey hours straddle the proposed operating hours for many types of tenants and land uses. As a result, the parking survey covers the peak parking demand time of day factors for a variety of existing and potential land uses.

The following adjustments were made to the collected observed parking demand counts to account for a full tenant occupancy scenario with the proposed project:
 Per the City of Laguna Hills Code, a 10% overage rate was applied to the peak observed parking counts to account for potential parking demand fluctuations.  Based on the City Parking Code, as shown in Table 2, the 9,520 square feet of proposed vacant space would require 48 parking spaces. Hence, the analysis includes increase of the site’s hourly observed parking demand by 48 parking spaces to account for full occupancy of the 9,520 square feet of proposed vacant space per the City Code.
 Lastly, the parking demand of 100 parking spaces was added for the proposed 20,00 square feet of Veterinary Clinic was added to the observed parking demand.

5.5.1.e
Packet Pg. 719 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) RK 15699

Page 5 ends

Table 3: Thursday, November 14th Observed Parking Results (100% Tenant Occupancy Scenario
 As identified in Table 3, assuming full tenant occupancy, the projected peak parking demand for the site occurs at 1:00 PM with a total of 341 parking spaces occupied out of 388 parking spaces provided.
 As a result, 88% of the parking spaces are occupied during the peak parking demand times with a total of 47 surplus parking spaces available within the shopping center.

Table 4: Friday, November 15th Observed Parking Results (100% Tenant Occupancy Scenario
 As identified in Table 4, assuming full tenant occupancy, the projected peak parking demand for the site occurs at 1:00 PM with a total of 355 parking spaces occupied out of 388 parking spaces provided.
 As a result, 91% of the parking spaces are occupied during the peak parking demand times with a total of 33 surplus parking spaces available within the shopping center.

Table 5: Saturday, November 16th Observed Parking Results (100% Tenant Occupancy Scenario
 As identified in Table 5, assuming full tenant occupancy, the projected peak parking demand for the site occurs at 2:00 PM with a total of 363 parking spaces occupied out of 388 parking spaces provided.
 As a result, 94% of the parking spaces are occupied during the peak parking demand times with a total of 25 surplus parking spaces available within the shopping center This was the peak observed parking demand for the project.

Table 6: Summary of Projected Observed Peak Hour Parking Demand Summary:
 As shown in Table 6, based on the results of forty-five (45) hours of observed parking demand surveys at Honali Plaza and assuming full tenant occupancy, the

5.5.1.e
Packet Pg. 720 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) RK 15699

Page 6 ends

projected overall peak parking demand occurs at 2:00 PM on a Saturday when a total of 94% of the parking lot is occupied.

Based on the observed parking demand surveys, assuming a 100% tenant occupancy scenario, the project site is projected to have adequate parking capacity to accommodate the proposed project. As a conservative measure, the observed parking counts include a 10% increase to account for parking demand fluctuations.

5.5.1.e
Packet Pg. 721 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) RK 15699

Page 7 ends

Attachments
RG:sl/RK15699.doc
JN:0896-2019-02
Conclusion
The Honali Plaza shopping center currently consists of approximately 74,202 square feet of retail, restaurant, etc. Under existing conditions, the project provides a total of 366 available parking spaces. Under future conditions, the project will provide a total of 388 available parking spaces that will be shared globally by tenants and visitors in a surface parking lot.

Based on a conservative calculation and assuming full tenant occupancy, the observed parking study indicates that the projected peak parking demand would occur on a typical Saturday at 2:00 PM t when a total of 94% of the parking lot is occupied. As a result, a total surplus of 25 parking spaces is available to visitors and employees during peak parking demand times.

In conclusion, the Honali Plaza shopping center is projected to have an adequate number of parking spaces to accommodate the proposed use mix of tenants during all times of the year assuming a full tenant occupancy scenario.

It is recommended that after the parking lot is restriped, another manual count of the parking spaces should be conducted to confirm the parking inventory. Additionally, it is recommended that a follow-up observed parking analysis be conducted to make sure that the Honali Plaza shopping center continues to provide an adequate number of parking spaces for all its tenants.

If you have any questions regarding this review or need further clarification, please contact us at (949) 474-0809.

Sincerely,
RK ENGINEERING GROUP, INC.

Rogier Goedecke Elias Bandek, EIT
President Engineer II

5.5.1.e
Packet Pg. 722 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Exhibits

5.5.1.e
Packet Pg. 723 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 724 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 725 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 726 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Tables

5.5.1.e
Packet Pg. 727 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Address Tenant S.F. Land Use Percent of Gross Floor
Area Parking Code1 Number of Spaces
Required Comments
24731A Swim Venture 2,400 Retail 3.23% 1/200 12.00
24731B Pharmacy 1,200 Retail 1.62% 1/200 6.00
24731D, 24731E Terra Mia Pizzeria 3,000 Restaurant 4.04% 1/250 12.00 24741A Millard Roth, DDS 1,200 Dental Office 1.62% 1/150 8.00 24741B Salon Boucle II & Spa (8 Chairs) 1,200 Beauty/Nail Salon 1.62% 3 Stalls/Chair 24.00 24741D Steve Costales, DCATC 1,205 Retail 1.62% 1/200 6.03 24741E Smoke Shop 1,800 Retail 2.43% 1/200 9.00
24741F Laguna Hills Nails (8 Chairs) 1,170 Beauty/Nail Salon 1.58% 3 Stalls/Chair 24.00 24741G Art Steps 1,785 Retail 2.41% 1/200 8.93
24741H Lee's Tae Kwon Do 2,400 Martial Arts Studio 3.23% 1/100 24.00 24741I The Collective Hair Salon (4 Chairs) 960 Beauty/Nail Salon 1.29% 3 Stalls/Chair 12.00 24741J Nuclear Comics & Skateboard 1,340 Retail 1.81% 1/200 6.70 24741K White Lotus Studio (2 Chairs) 1,240 Tattoo Parlor 1.67% 3 Stalls/Chair 6.00 (Per COUO) 24751A, 24751B SAS Shoes 2,340 Retail 3.15% 1/200 11.70 24751C Diamonds Etc. 1,356 Retail 1.83% 1/200 6.78
24751D Palace Bakery 1,444 Restaurant 1.95% 1/250 5.78
24751E Togo's 2,000 Restaurant 2.70% 1/250 8.00
24761 Wendy's 2,334 Restaurant 3.15% 1/50 46.68
24771A, 24771E Jordan Market 6,288 Retail 8.47% 1/200 31.44 24771G Clear Choice Hearing Aid 820 Retail 1.11% 1/200 4.10 24781A Golden Baked Hams 2,400 Retail 3.23% 1/200 12.00 24781B, 24781C Jordan Market Café 2,400 Restaurant 3.23% 1/250 9.60 24781D E-Cig Gallery 1,200 Retail 1.62% 1/200 6.00
24781E Lulu Café 1,200 Restaurant 1.62% 1/250 4.80
44,682 60.22% 305.53
24721A VACANT (Proposed Veterinary Clinic) 20,000 Retail 26.95% 1/200 100.00 24721A VACANT 7,320 Retail 9.86% 1/200 37.00
24731C VACANT 1,000 Retail 1.35% 1/200 5.00
24741C VACANT 1,200 Retail 1.62% 1/200 6.00
29,520 39.78% 148.00
74,202 100.00% 454
388
-66
-14.54%

SUBTOTAL VACANT UNITS
Total Parking Spaces Provided On-Site (The parking lot reconfiguration will increase the parking supply by 22 spaces. (366 + 22 = 388)2 Number of Deficient Parking Spaces Per Municipal Code
Grand Total Shopping Center
1 Parking rates obtained from City of Laguna Hills Municipal Parking Code Section 9-44.050 - Required Parking.

Percent Deficient Per Code
Table 1
City of Laguna Hills Municipal Parking Code (9-44.050 Required Parking)1 Parking Requirments for Existing Condtions
Honali Plaza

SUBTOTAL OCCUPIED UNITS
j:\rktables\RK15699.1TB.xls
JN:0896-2019-02

5.5.1.e
Packet Pg. 728 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Address Tenant S.F. Land Use Percent of Gross Floor
Area Parking Code1 Number of Spaces
Required Comments
24721A Veterinary Clinic (Proposed)2 20,000 Veterinary Clinic 26.95% 1/200 100.00 24731A Swim Venture 2,400 Retail 3.23% 1/200 12.00
24731B Pharmacy 1,200 Retail 1.62% 1/200 6.00
24731D, 24731E Terra Mia Pizzeria 3,000 Restaurant 4.04% 1/250 12.00 24741A Millard Roth, DDS 1,200 Dental Office 1.62% 1/150 8.00 24741B Salon Boucle II & Spa (8 Chairs) 1,200 Beauty/Nail Salon 1.62% 3 Stalls/Chair 24.00 24741D Steve Costales, DCATC 1,205 Retail 1.62% 1/200 6.03 24741E Smoke Shop 1,800 Retail 2.43% 1/200 9.00
24741F Laguna Hills Nails (8 Chairs) 1,170 Beauty/Nail Salon 1.58% 3 Stalls/Chair 24.00 24741G Art Steps 1,785 Retail 2.41% 1/200 8.93
24741H Lee's Tae Kwon Do 2,400 Martial Arts Studio 3.23% 1/100 24.00 24741I The Collective Hair Salon (4 Chairs) 960 Beauty/Nail Salon 1.29% 3 Stalls/Chair 12.00 24741J Nuclear Comics & Skateboard 1,340 Retail 1.81% 1/200 6.70 24741K White Lotus Studio (2 Chairs) 1,240 Tattoo Parlor 1.67% 3 Stalls/Chair 6.00 (Per COUO) 24751A, 24751B SAS Shoes 2,340 Retail 3.15% 1/200 11.70 24751C Diamonds Etc. 1,356 Retail 1.83% 1/200 6.78
24751D Palace Bakery 1,444 Restaurant 1.95% 1/250 5.78
24751E Togo's 2,000 Restaurant 2.70% 1/250 8.00
24761 Wendy's 2,334 Restaurant 3.15% 1/50 46.68
24771A, 24771E Jordan Market 6,288 Retail 66.05% 1/200 31.44 24771G Clear Choice Hearing Aid 820 Retail 1.11% 1/200 4.10 24781A Golden Baked Hams 2,400 Retail 3.23% 1/200 12.00 24781B, 24781C Jordan Market Café 2,400 Restaurant 3.23% 1/250 9.60 24781D E-Cig Gallery 1,200 Retail 1.62% 1/200 6.00
24781E Lulu Café 1,200 Restaurant 1.62% 1/250 4.80
64,682 144.75% 405.53
24731C VACANT 1,000 Retail 1.35% 1/200 5.00
24741C VACANT 1,200 Retail 1.62% 1/200 6.00
24721A VACANT 7,320 Retail 9.86% 1/200 37.00
9,520 12.83% 48.00
74,202 157.58% 454
388
-66
-14.54%

SUBTOTAL OCCUPIED UNITS

SUBTOTAL VACANT UNITS
Grand Total Shopping Center
Table 2
City of Laguna Hills Municipal Parking Code (9-44.050 Required Parking)1 Parking Requirements for Proposed Conditions
Honali Plaza
Total Parking Spaces Provided On-Site (The parking lot reconfiguration will increase the parking supply by 22 spaces. (366 + 22 = 388)3 Number of Deficient Parking Spaces Per Municipal Code
Percent Deficient Per Code
1 Parking rates obtained from City of Laguna Hills Municipal Parking Code Section 9-44.050 - Required Parking. j:\rktables\RK15699.1TB.xls
JN:0896-2019-02

5.5.1.e
Packet Pg. 729 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Reg  Reg  Reg  Reg 
Spaces Provided5 118 2 131 10 91 8 28 0 388
7:00 AM 4 0 11 0 4 0 1 0 2 48 100 170 44%8:00 AM 9 0 14 0 9 0 0 0 3 48 100 183 47%9:00 AM 12 0 28 0 12 1 0 0 5 48 100 206 53% 10:00 AM 32 0 39 2 32 1 0 0 11 48 100 265 68%11:00 AM 40 0 47 2 41 1 0 0 13 48 100 292 75% 12:00 PM 47 0 64 2 29 0 1 0 14 48 100 305 79%
1:00 PM 63 0 60 5 46 1 0 0 18 48 100 341 88%2:00 PM 53 0 57 1 53 2 0 0 17 48 100 331 85%3:00 PM 45 0 46 2 49 0 0 0 14 48 100 304 78%4:00 PM 28 0 46 2 50 0 1 0 13 48 100 288 74%5:00 PM 28 0 46 0 50 0 1 0 13 48 100 286 74%6:00 PM 30 0 48 0 51 0 1 0 13 48 100 291 75%7:00 PM 21 0 42 0 42 0 1 0 11 48 100 265 68%8:00 PM 14 0 26 2 25 0 1 0 7 48 100 223 57%9:00 PM 15 0 20 0 6 0 0 0 4 48 100 193 50% 10:00 PM 7 0 4 0 2 0 0 0 1 48 100 162 42%
Add Proposed
Veterinary
Clinic
(20,000 s.f.)2
3 Per the City of Laguna Hills Code, a 10% overage rate was applied to the observed parking counts to account for potential parking demand fluctuations.

Add Proposed
Vacant Retail
(9,520 s.f.)1
Add 10%
Increase3
ZONE 2 ZONE 3 ZONE 4
1 The proposed tenant mix includes a total of 9,520 square feet of vacant retail use. 2 The 20,000 square feet of proposed Veterinary Clinc requires 100 parking spaces.

Table 3
Honali Plaza
Observed Hourly Parking Demand w/ a 100% Tenant Occupancy Scenario Thursday, November 14, 2019
TIME
ZONE 1
TOTAL Percentage
Occupied3
j:\rktables\RK15699.1TB.xlsJN:0896-2019-02

5.5.1.e
Packet Pg. 730
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084- Reg  Reg  Reg  Reg 
Spaces Provided5 118 2 131 10 91 8 28 0 388
7:00 AM 5 0 12 0 2 0 0 0 2 48 100 169 44%8:00 AM 14 0 24 2 8 0 0 0 5 48 100 201 52%9:00 AM 23 0 35 0 23 0 0 0 8 48 100 237 61% 10:00 AM 36 0 44 3 35 0 1 0 12 48 100 279 72%11:00 AM 46 0 52 3 38 0 0 0 14 48 100 301 78% 12:00 PM 52 0 71 6 42 0 0 0 17 48 100 336 87%
1:00 PM 60 0 75 3 47 1 2 0 19 48 100 355 91%2:00 PM 57 0 55 1 45 1 2 0 16 48 100 325 84%3:00 PM 49 0 58 2 47 2 1 0 16 48 100 323 83%4:00 PM 42 0 56 2 60 0 1 0 16 48 100 325 84%5:00 PM 35 0 53 1 55 1 2 0 15 48 100 310 80%6:00 PM 31 0 61 3 54 2 1 0 15 48 100 315 81%7:00 PM 21 0 43 0 38 0 1 0 10 48 100 261 67%8:00 PM 25 0 46 1 17 0 1 0 9 48 100 247 64%9:00 PM 14 0 28 0 2 0 1 0 5 48 100 198 51% 10:00 PM 7 0 14 0 3 0 1 0 3 48 100 176 45%
1 The proposed tenant mix includes a total of 9,520 square feet of vacant retail use.

Add 10%
Increase3
3 Per the City of Laguna Hills Code, a 10% overage rate was applied to the observed parking counts to account for potential parking demand fluctuations.

ZONE 2 ZONE 3 ZONE 4
2 The 20,000 square feet of proposed Veterinary Clinc requires 100 parking spaces.

Table 4
Honali Plaza
Observed Hourly Parking Demand w/ a 100% Tenant Occupancy Scenario Friday, November 15, 2019
TIME
ZONE 1
Add Proposed
Vacant Retail
(9,520 s.f.)1
TOTAL Percentage
Occupied3
Add Proposed
Veterinary
Clinic
(20,000 s.f.)2
j:\rktables\RK15699.1TB.xlsJN:0896-2019-02

5.5.1.e
Packet Pg. 731
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084- Reg  Reg  Reg  Reg 
Spaces Provided5 118 2 131 10 91 8 28 0 388
7:00 AM 3 0 12 0 0 0 1 0 2 48 100 166 43%8:00 AM 10 0 18 0 1 0 1 0 3 48 100 181 47%9:00 AM 23 0 37 0 23 0 1 0 8 48 100 240 62% 10:00 AM 33 0 48 0 30 1 0 0 11 48 100 271 70%11:00 AM 51 0 59 2 34 2 1 0 15 48 100 312 80% 12:00 PM 68 0 58 1 42 1 1 0 17 48 100 336 87%
1:00 PM 73 2 62 1 46 0 1 0 19 48 100 352 91%2:00 PM 58 0 66 3 65 2 1 0 20 48 100 363 94%3:00 PM 44 0 45 0 65 1 1 0 16 48 100 320 82%4:00 PM 38 0 42 1 61 1 1 0 14 48 100 306 79%5:00 PM 42 0 39 0 43 2 1 0 13 48 100 288 74%6:00 PM 26 0 33 0 27 1 1 0 9 48 100 245 63%7:00 PM 25 0 31 0 22 0 1 0 8 48 100 235 61%8:00 PM 24 0 20 1 15 0 1 0 6 48 100 215 55%9:00 PM 15 0 19 1 20 0 0 0 6 48 100 209 54% 10:00 PM 18 0 7 0 22 0 0 0 5 48 100 200 52%
Add Proposed
Veterinary Clinic
(20,000 s.f.)2
3 Per the City of Laguna Hills Code, a 10% overage rate was applied to the observed parking counts to account for potential parking demand fluctuations.

Add 10%
Increase3
ZONE 2 ZONE 3 ZONE 4
1 The proposed tenant mix includes a total of 9,520 square feet of vacant retail use. 2 The 20,000 square feet of proposed Veterinary Clinc requires 100 parking spaces.

Table 5
Honali Plaza
Observed Hourly Parking Demand w/ a 100% Tenant Occupancy Scenario Saturday, November 16, 2019
TIME
ZONE 1
Add Proposed
Vacant Retail
(9,520 s.f.)1
TOTAL Percentage
Occupied3
j:\rktables\RK15699.1TB.xlsJN:0896-2019-02

5.5.1.e
Packet Pg. 732
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084- Table Observed Date Peak Hour Parking
Demand Time
Peak Hour Parking
Demand
Parking Spaces
Provided2
Percent
Occupied
Parking
Spaces
Available
3 Thursday, November 14, 2019 1:00 PM 341 388 88% 47
4 Friday, November 15, 2019 1:00 PM 355 388 91% 33
5 Saturday, November 16, 2019 2:00 PM 363 388 94% 25
1 The observed parking surveys were obtained during typical operating conditions at one hour intervals from 7:00 AM to 10:00 PM for a typical Thursday, Friday, and Saturday. The study days are consistent with shopping center peak parking demand data published in the ITE (Institute of Transportation Engineers) Parking Generation Manual 5th Edition and the ULI (Urban Land Institute) Third Edition Shared Parking Manual.

Table 6
Honali Plaza
Summary Projected Observed Peak Hour Parking Demand1
j:\rktables\RK15699.1TB.xls
JN:0896-2019-02

5.5.1.e
Packet Pg. 733 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Appendices

5.5.1.e
Packet Pg. 734 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Appendix A
City of Laguna Hills Parking Code

5.5.1.e
Packet Pg. 735 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) 9-44.110
238-127 (Laguna Hills Supp. No. 22, 6-19)
Ramps with a grade of ten percent or less shall have a
transition zone at least eight feet in length. Ramps with a grade of greater than ten percent shall have transition zones at least twelve (12) feet in length. The grade of a transition zone shall not exceed one-half the grade of the ramp it serves.

F. Elevators. Parking structures of two stories or
more shall incorporate at least one passenger elevator
meeting handicap standards. Additional elevators are
required for a multi-level structure accommodating two
hundred fifty (250) or more parking stalls subject to
approval by the Community Development Director.

G. Mirrors for Sight Distance. Blind corners shall be
provided with viewing mirrors maintained in a position
and condition to provide adequate sight distance. (Ord. 98-8 § 2 (part): prior code § 9-26.110)
Table 9-44.A

NUMBER OF PARKING STALLS REQUIRED
Use Required Number of Stalls
Residential Uses
Duplex 2 car garage (for each unit)
Fraternity, sorority or rooming house 1 stall per bedroom, plus 2 covered Accessory dwelling unit See Chapter 9-68
Mobile home park 1 covered and assigned stall, plus 2 visitor stall per mobile home
Multi-family units
(including timeshares):

Stalls per unit:
1 bedroom or less
2 bedrooms
3 bedrooms
more than 3 bedrooms
Covered

1.0 1.0

2.0 2.0
Uncovered(1)

0.5 1.0

0.5 0.5(2)
Visitor

0.2 0.2

0.2 0.2
(1)Covered stalls shall be assigned; uncovered stalls shall not be assigned.
(2)Plus 0.5 uncovered stall per additional bedroom in excess of

3. Senior citizen housing complex 1 covered and assigned stall, plus 2 guest stall per dwelling unit, plus 1 stall for the resident manager
Senior congregate care facilities 1 stall per unit plus 1 for each two (2) employees Single-family, attached 2 assigned and covered parking stalls within a garage or parking structure, plus .3 stalls unassigned per dwelling unit
Single-family, detached:
up to 4 bedrooms
over 4 bedrooms
2 in garage
2 in garage + 1 covered stall for every 2 bedrooms over 4 bedrooms
Community Uses
Church, chapel, religious facility, cemetery, mortuary, public assembly
1 stall/3 fixed seats (or 54" of bench seating), or 1 stall/35 SFGFA within main auditorium where no seats are provided College or university 1 stall/employee, plus 1 stall/3 students based on maximum student capacity

5.5.1.e
Packet Pg. 736 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) 9-44.110
(Laguna Hills Supp. No. 22, 6-19) 238-128
Convalescent hospital, rest home, or sanitarium 1 stall/3 beds, plus if employee residence facilities are provided on-site, additional parking in accordance with applicable residential requirements contained within the development code
Day care, nursery school 1 stall/2 employees, plus 1 stall/5 children, based on facility capacity
Elementary and junior high school 1.5 stalls/classroom, plus 1 stall/5 fixed seats in auditorium, gymnasium, or similar public assembly facility (35 SF=5 fixed seats)
High school 1.5 stalls/classroom, plus 1 stall/3 students based on maximum student capacity
Hospitals and medical center (providing acute care,
clinical, surgical, teaching, research, and office
services)
2 stalls/patient bed or 1 stall/300 SF-GFA, whichever is greater Libraries 1 stall/200 SF-GFA
Museums, art galleries 1 stall/250 SF-GFA
Public utility facilities 1 stall/2 employees in the largest shift, plus 1 stall for each vehicle used in connection with the use
Theaters:

Movie—multiple screen
Movie—single screen
Live performance
1 stall/4 seats, plus 10 stalls for employees
1 stall/4 seats, plus 6 stalls for employees
1 stall/4 fixed seats; without fixed seats, one space per 21 square feet of GFA
Trade school, business school, or adult education 1 stall/1.5 people based on maximum number of students and staff, or 1 stall/35 SF of GFA
Union halls, lodges, and clubs 1 stall/50 SF-GFA
Table 9-44.A (Continued)

NUMBER OF PARKING STALLS REQUIRED
Use Required Number of Stalls

5.5.1.e
Packet Pg. 737 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) 9-44.110
238-129 (Laguna Hills Supp. No. 21, 6-18)
Industrial Uses
General manufacturing and processing uses (not
including buildings used exclusively for warehouse
purposes)
1 stall/400 SF of industrial/manufacturing area, plus 1 stall/250 SF of office use, plus 1 stall/1,000 SF of warehouse area Mini-storage warehouse 1 stall/2,000 SF-GFA
Recreational vehicle and boat storage 5 stalls (minimum) or, 1 stall/10,000 SF of storage area, whichever is greater
Recycling center 1 stall/250 SF-GFA of office area, plus 1 stall/1,000 SF of warehouse area, plus 1 stall/10,000 SF of yard area.

Research and development 1 stall/250 SF-GFA
Towing facilities – indoor vehicle impound and
indoor towing service business – (indoor only)
5 stalls (minimum) or 1 stall/10,000 SF of storage area, whichever is greater
Warehouses (used exclusively for storage) 1 stall/1,500 SF of warehouse area, plus 1 stall/250 SF of office use
Office Uses
Business and professional office (except medical) 1 stall/300 SF-GFA Financial services (banks, savings and loans, credit
unions)
1 stall/250 SF-GFA
Medical and dental office 1 stall/150 SF-GFA
Veterinary office 1 stall/200 SF-GFA
Commercial Uses—Retail and Service
Art galleries 1 stall/500 SF-GFA
Automobile/truck/RV sales 1 stall/400 SF indoor GFA plus 1 stall/4,000 SF outdoor retail area
Automotive service and repair 2 stalls, plus 3 stalls/service bay (service bays do not count as stalls) or 1 stall/500 SF gross floor area when no bays are defined
Bed and breakfast 2 covered and assigned stalls, plus 1 stall/guest room Car wash 6 stalls per tunnel (plus additional stacking and drying areas as necessary to match capacity)
Furniture stores and home furnishing showrooms
(only where items are ordered primarily for home
delivery or installation, such as carpet/flooring,
window coverings and windows)
1 stall/500 SF-GFA
Gas station 2 stalls, plus additional parking as required for convenience store or auto service/repair uses. The gas station convenience store parking requirement shall be 1 stall/800 SF-GFA. Parking spaces abutting air and water service shall not be included in the total number of parking spaces.

Table 9-44.A (Continued)

NUMBER OF PARKING STALLS REQUIRED
Use Required Number of Stalls

5.5.1.e
Packet Pg. 738 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) 9-44.110
(Laguna Hills Supp. No. 21, 6-18) 238-130
General retail 1 stall/200 SF-GFA
1If restaurant space occupies more than 10% of total GFA, or if an individual restaurant contains more than 1,000 SF, then additional parking stalls shall be provided for excess restaurant space beyond the 10% or 1,000 SF. The additional parking shall be calculated at the restaurant rate
Laundromat 1 stall/200 SF-GFA
Outdoor sales, including lumber yards and salvage
yards
1 stall/1,000 SF gross outdoor retail area, plus additional parking as required for indoor sales area, service facilities, and other uses
Plant nurseries 1 stall/1,000 SF indoor GFA, plus 1 stall/2,000 SF gross outdoor retail areas
Resorts, hotels, and motels 1 stall/guest room plus additional parking as required for other accessory uses
Restaurants:

Dine-in (< 4,000 SF-GFA):
4,000 SF-GFA +:

Fast food:

Take-out:

Outdoor dining areas in excess of 16 seats:
1 stall/100 SF-GFA
40 stalls, plus 1 stall/50 SF-GFA above 4,000 SF-GFA
10 stalls, or 1 stall/50 SF-GFA, whichever is greater
1 stall/250 SF-GFA
1 stall for 150 SF of entire outdoor dining area (Note: Outdoor seating areas with 16 or less seats need not provide additional parking)
Self-service car wash 2.5 stalls/wash bay (wash bays do not count as stalls) Commercial Uses—Personal Services
Animal boarding/grooming 1 stall/400 SF-GFA
Barber shop 2 stalls/barber chair
Beauty/nail salon 3 stalls/beautician chair
Dry cleaner 1 stall/400 SF-GFA
Massage establishment 3 stalls/massage station
Shoe repair 1 stall/400 SF-GFA
Tailor 1 stall/400 SF-GFA
Commercial Recreation Uses
Arcades, pool halls, and bingo halls 1 stall/150 SF-GFA Bowling alley 4 stalls/lane, plus other uses calculated separately Commercial stables 1 stall/5 horses
Dance halls 1 stall/7 SF dance floor
Driving range 1 stall/tee, plus other uses calculated separately Golf courses—(regulation and pitch and putt) 9 stalls/hole, plus other uses calculated separately Gyms, spas and health clubs 1 stall/100 SF-GFA
Handball and racquetball courts 3 stalls/court, plus other uses calculated separately Miniature golf 1.5 stalls/hole, plus other uses calculated separately Table 9-44.A (Continued)

NUMBER OF PARKING STALLS REQUIRED
Use Required Number of Stalls

5.5.1.e
Packet Pg. 739 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) 9-44.110
238-131 (Laguna Hills Supp. No. 22, 6-19)
(Ord. 2018-7 § 10; Ord. 2017-5 § 5; Ord. 2017-4 § 8; Ord. 2003-5 Exh. A § B; Ord. 98-8 § 2 (part)) Table 9-44.B

HANDICAP STALLS REQUIRED
(Ord. 98-8 § 2 (part))
Skating rink—ice or roller 1 stall/100 SF of rink, plus other uses calculated separately Swimming pool—commercial 10 stalls, or 1 stall/150 SF of water surface area plus 1 stall/2 employees
Tennis courts 3 stalls/court plus other uses calculated separately Total Number of Parking Stalls
in Parking Lot or Garage
Minimum Number of Required
Handicapped Parking Stalls
1 — 40 1
41 — 80 2
81 — 120 3
121 — 160 4
161 — 300 5
301 — 400 6
401 — 500 7
over 500 2% of total stalls
Table 9-44.C

ACCESS DESIGN FOR PARKING LOCATIONS
Residential # Spaces
Served
Min. Throat
Length
Min. Throat
Width
Min. # Lanes
Req.

Max. Throat
Length
Max. Throat
Width
Open and
covered
0—100 20 ft. 24 ft. 2 50 ft. 36 ft.
100—250 30 ft. 24 ft. 2 50 ft. 36 ft.
250 + 50 ft. 24 ft. 2 50 ft. 36 ft.

Structured 0—250+ 24 ft. 28 ft. 2 50 ft. 36 ft.

Commercial # Spaces
Served
Min. Throat
Length
Min. Throat
Width
Min. # Lanes
Req.

Max. Throat
Length
Max. Throat
Width
Open and
covered
0—100 30 ft. 24 ft. 2 130 ft. 36 ft.
100—250 40 ft. 36 ft. 2 in/1 out 190 ft. 48 ft.
250+ 100 ft. 48 ft. 2 in/2 out 250 ft. 56 ft.

Table 9-44.A (Continued)

NUMBER OF PARKING STALLS REQUIRED
Use Required Number of Stalls

5.5.1.e
Packet Pg. 740 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Appendix B
ITE (Institute of Transportation Engineers)
Parking Generation Manual 5th Edition (January 2019)
Shopping Center Peak Parking Demand Rates

5.5.1.e
Packet Pg. 741 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 742
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 743
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 744
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 745
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Appendix C
Honali Plaza
Observed Parking Counts

5.5.1.e
Packet Pg. 746 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Zone 4
Regular Spaces Handicap Regular Spaces Handicap Regular Spaces Handicap Loading Regular Spaces Parking
Spaces 118 2 120 121 9 130 80 8 - 88 28 28 366
7:00 AM 4 0 4 3% 11 0 11 8% 4 0 1 5 6% 1 1 4% 21 6%8:00 AM 9 0 9 8% 14 0 14 11% 9 0 3 12 14% 0 0 0% 35 10%9:00 AM 12 0 12 10% 28 0 28 22% 12 1 3 16 18% 0 0 0% 56 15% 10:00 AM 32 0 32 27% 39 2 41 32% 32 1 3 36 41% 0 0 0% 109 30%11:00 AM 40 0 40 33% 47 2 49 38% 41 1 2 44 50% 0 0 0% 133 36% 12:00 PM 47 0 47 39% 64 2 66 51% 29 0 2 31 35% 1 1 4% 145 40% 1:00 PM 63 0 63 53% 60 5 65 50% 46 1 2 49 56% 0 0 0% 177 48%2:00 PM 53 0 53 44% 57 1 58 45% 53 2 2 57 65% 0 0 0% 168 46%3:00 PM 45 0 45 38% 46 2 48 37% 49 0 2 51 58% 0 0 0% 144 39%4:00 PM 28 0 28 23% 46 2 48 37% 50 0 2 52 59% 1 1 4% 129 35%5:00 PM 28 0 28 23% 46 0 46 35% 50 0 2 52 59% 1 1 4% 127 35%6:00 PM 30 0 30 25% 48 0 48 37% 51 0 2 53 60% 1 1 4% 132 36%7:00 PM 21 0 21 18% 42 0 42 32% 42 0 2 44 50% 1 1 4% 108 30%8:00 PM 14 0 14 12% 26 2 28 22% 25 0 2 27 31% 1 1 4% 70 19%9:00 PM 15 0 15 13% 20 0 20 15% 6 0 2 8 9% 0 0 0% 43 12% 10:00 PM 7 0 7 6% 4 0 4 3% 2 0 2 4 5% 0 0 0% 15 4%
Total Percent
Occupied
Zone 3
Total Percent
Occupied
Laguna Hills, CA
Honali Plaza
Thursday, November 14th, 2019
Time Zone 1 Zone 2 Grand Total Percent
Occupied
Parking Zone
Total Percent
Occupied
Total Percent
Occupied
Laguna Hills.xlsx

5.5.1.e
Packet Pg. 747
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Zone 4
Regular Spaces Handicap Regular Spaces Handicap Regular Spaces Handicap Loading Regular Spaces Parking
Spaces 118 2 120 121 9 130 80 8 - 88 28 28 366
7:00 AM 5 0 5 4% 12 0 12 9% 2 0 1 3 3% 0 0 0% 20 5%8:00 AM 14 0 14 12% 24 2 26 20% 8 0 1 9 10% 0 0 0% 49 13%9:00 AM 23 0 23 19% 35 0 35 27% 23 0 1 24 27% 0 0 0% 82 22% 10:00 AM 36 0 36 30% 44 3 47 36% 35 0 2 37 42% 1 1 4% 121 33%11:00 AM 46 0 46 38% 52 3 55 42% 38 0 3 41 47% 0 0 0% 142 39% 12:00 PM 52 0 52 43% 71 6 77 59% 42 0 1 43 49% 0 0 0% 172 47% 1:00 PM 60 0 60 50% 75 3 78 60% 47 1 2 50 57% 2 2 7% 190 52%2:00 PM 57 0 57 48% 55 1 56 43% 45 1 4 50 57% 2 2 7% 165 45%3:00 PM 49 0 49 41% 58 2 60 46% 47 2 2 51 58% 1 1 4% 161 44%4:00 PM 42 0 42 35% 56 2 58 45% 60 0 2 62 70% 1 1 4% 163 45%5:00 PM 35 0 35 29% 53 1 54 42% 55 1 2 58 66% 2 2 7% 149 41%6:00 PM 31 0 31 26% 61 3 64 49% 54 2 2 58 66% 1 1 4% 154 42%7:00 PM 21 0 21 18% 43 0 43 33% 38 0 2 40 45% 1 1 4% 105 29%8:00 PM 25 0 25 21% 46 1 47 36% 17 0 2 19 22% 1 1 4% 92 25%9:00 PM 14 0 14 12% 28 0 28 22% 2 0 2 4 5% 1 1 4% 47 13% 10:00 PM 7 0 7 6% 14 0 14 11% 3 0 2 5 6% 1 1 4% 27 7%
Zone 3
Total Percent
Occupied
Honali Plaza
Laguna Hills, CA
Friday, November 15th, 2019
Time
Parking Zone
Zone 1
Total Percent
Occupied
Zone 2
Total Percent
Occupied
Grand Total Percent
Occupied
Total Percent
Occupied
Laguna Hills.xlsx

5.5.1.e
Packet Pg. 748
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Zone 4
Regular Spaces Handicap Regular Spaces Handicap Regular Spaces Handicap Loading Regular Spaces Parking
Spaces 118 2 120 121 9 130 80 8 - 88 28 28 366
7:00 AM 3 0 3 3% 12 0 12 9% 0 0 2 2 2% 1 1 4% 18 5%8:00 AM 10 0 10 8% 18 0 18 14% 1 0 2 3 3% 1 1 4% 32 9%9:00 AM 23 0 23 19% 37 0 37 28% 23 0 2 25 28% 1 1 4% 86 23% 10:00 AM 33 0 33 28% 48 0 48 37% 30 1 2 33 38% 0 0 0% 114 31%11:00 AM 51 0 51 43% 59 2 61 47% 34 2 3 39 44% 1 1 4% 152 42% 12:00 PM 68 0 68 57% 58 1 59 45% 42 1 2 45 51% 1 1 4% 173 47% 1:00 PM 73 2 75 63% 62 1 63 48% 46 0 2 48 55% 1 1 4% 187 51%2:00 PM 58 0 58 48% 66 3 69 53% 65 2 1 68 77% 1 1 4% 196 54%3:00 PM 44 0 44 37% 45 0 45 35% 65 1 2 68 77% 1 1 4% 158 43%4:00 PM 38 0 38 32% 42 1 43 33% 61 1 2 64 73% 1 1 4% 146 40%5:00 PM 42 0 42 35% 39 0 39 30% 43 2 2 47 53% 1 1 4% 129 35%6:00 PM 26 0 26 22% 33 0 33 25% 27 1 2 30 34% 1 1 4% 90 25%7:00 PM 25 0 25 21% 31 0 31 24% 22 0 2 24 27% 1 1 4% 81 22%8:00 PM 24 0 24 20% 20 1 21 16% 15 0 2 17 19% 1 1 4% 63 17%9:00 PM 15 0 15 13% 19 1 20 15% 20 0 2 22 25% 0 0 0% 57 16% 10:00 PM 18 0 18 15% 7 0 7 5% 22 0 2 24 27% 0 0 0% 49 13% Zone 3
Total Percent
Occupied
Honali Plaza
Laguna Hills, CA
Saturday, November 16th, 2019
Time
Parking Zone
Zone 1
Total Percent
Occupied
Zone 2
Total Percent
Occupied
Grand Total Percent
Occupied
Total Percent
Occupied
Laguna Hills.xlsx

5.5.1.e
Packet Pg. 749
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza)) Appendix D
Photos

5.5.1.e
Packet Pg. 750 Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-2022 (Honali Plaza))

5.5.1.e
Packet Pg. 751
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084-

5.5.1.e
Packet Pg. 752
Attachment: Attachment E – Observed Parking Study (2776 : SDP No. USE-0027-2020, PUP No. USE-0084- City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 22, 2022
TO: Mayor and Council Members
FROM: Kenneth H. Rosenfield P.E.

Interim City Manager/Director of Public Services
ISSUE: Notice of Retirement of Kenneth H. Rosenfield, Interim City Manager, and Acceptance of Letter of Resignation
RECOMMENDATION: That the City Council:
(1) Acknowledge Receipt of Notice of Retirement and Letter of Resignation Submitted by Interim City Manager/Public Services Director/City Engineer Kenneth H. Rosenfield, P.E., dated March 10, 2022;
(2) Accept Notice of Retirement and Letter of Resignation Submitted by Interim City Manager/Public Services Director/City Engineer Kenneth H. Rosenfield, P.E., dated March 10, 2022 after 30 Years of Dedicated Service to the City of Laguna Hills; and Last Day of Service to the City will be April 1, 2022;
SUMMARY:

After 30 years of dedicated service to the City of Laguna Hills as the Public Services Director/City Engineer, including serving the last 14-months as the Interim City Manager, Mr. Kenneth H. Rosenfield, P.E., has announced his retirement and submitted his letter of resignation dated March 10, 2022. Mr. Rosenfield’s last day of employment with the City of the Laguna Hills will be April 1, 2022, as stated in his attached letter of resignation.

It is in order for the City Council to acknowledge receipt of Mr. Rosenfield’s notice of retirement and his Rosenfield’s letter of resignation.

7.1.1 Packet Pg. 753
Notice of Retirement and Resignation of Kenneth H. Rosenfield, Interim City Manager March 22, 2022

Page 2 ends

ATTACHMENTS:
• KRosenfield Retirement Letter

7.1.1 Packet Pg. 754

7.1.1.a
Packet Pg. 755 Attachment: KRosenfield Retirement Letter (2791 : Notice of Retirement and Resignation of Kenneth H. Rosenfield, Interim City Manager) City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 22, 2022
TO: Mayor and Council Members
FROM: Gregory E. Simonian
City Attorney
ISSUE: Temporary Appointment of Interim City Manager Pending Recruitment for Permanent City Manager Position
RECOMMENDATION: That the City Council:
(1) Certify that with the retirement of Kenneth H. Rosenfield on April 1, 2022, the position of City Manager will be vacant while the City Council continues its recruitment for a new City Manager;
(2) Certify that while vacant, the position of City Manager will be a position to be filled for a limited duration by a retired annuitant on an interim basis; (3) Certify that the appointment is necessary to fill a critically needed position sooner than 180 days after Mr. Rosenfield’s effective retirement date of April 1, 2022; (4) Temporarily appoint Mr. Rosenfield to the limited duration, retired annuitant position of Interim City Manager while the City Council completes its recruitment to fill the City Manager position on a permanent basis; and (5) Approve and authorize the Mayor/Mayor Pro Tempore to execute a retired annuitant employment agreement with Kenneth H. Rosenfield, P.E., for the position of Interim City Manager, which satisfies the CalPERS requirements for the temporary employment of a retired annuitant.

SUMMARY:

7.2.1 Packet Pg. 756
Temporary Appointment of Interim City Manager
March 22, 2022

Page 2 ends

On March 10, 2022, Interim City Manager Kenneth H. Rosenfield, P.E., submitted a letter of resignation indicating his intent to retire from the City, effective April 1, 2022, after nearly 27-years of dedicated public service. During his tenure with the City, he has served as the City's first Public Services Director/City Engineer; most notably serving as the Interim City Manager for the past 14-months. Mr. Rosenfield's letter of resignation was placed on the March 22, 2022 agenda for City Council review and acceptance.

Pending the selection of a new city manager, a process already initiated, but not completed, by the City Council, it is recommended that the City Council, pursuant to Government Code §§7522.56 and 21221(h), appoint Mr. Rosenfield to the soon-to-be vacant interim position of City Manager for a limited duration consistent with the requirements set forth in CalPERS regulations applicable to the employment of retired annuitants, which requirements are described below
BACKGROUND:

This item is related to the pending formal competitive selection process for filling the city manager position and has been placed on the agenda at the recommendation of the City Attorney. In preparation for selecting a new city manager, a process already initiated by the City Council, it is recommended that the City Council, pursuant to Government Code §§7522.56 and 21221(h), appoint Mr. Rosenfield to the interim position of City Manager for a limited duration consistent with the requirements set forth in CalPERS regulations applicable to the employment of retired annuitants, which requirements are described below.

In order for the City Council to appoint Mr. Rosenfield to this interim position after his retirement, the following conditions must be met:
• The City must have an active recruitment for a permanent replacement for the vacant position. As set forth above, the City currently has such an active recruitment in place.
• The City can only appoint a retired annuitant to an interim position during the period of recruitment and not in a permanent capacity. The City satisfies this requirement as well and only intends to employ Mr. Rosenfield until a new city manager is selected, and, potentially, for a short period thereafter for purposes of a limited transition only.
• Mr. Rosenfield would not be permitted to work more than 960 hours in a fiscal year. The City must enroll and report Mr. Rosenfield’s hours to CalPERS pursuant

7.2.1 Packet Pg. 757
Temporary Appointment of Interim City Manager
March 22, 2022

Page 3 ends

to Government Code section 21220.
• The City cannot compensate Mr. Rosenfield more than the maximum pay rate for the vacant position as listed on the employer’s publicly available pay schedule.

Mr. Rosenfield’s current salary set forth in the publicly available pay schedule is $269,000. It is therefore proposed that the City pay Mr. Rosenfield $129.33 per hour for appointment to this vacant limited duration position (which is the hourly equivalent of the salary currently associated with the position). • Mr. Rosenfield may not receive any additional benefits or compensation, other than reimbursement of business expenses.
• The City must certify that the position to which Mr. Rosenfield will be appointed is of a limited duration for a retired annuitant during its temporary vacancy. • The City must further certify that the appointment is necessary to fill a critically needed position sooner than 180 days after Mr. Rosenfield’s effective retirement date of April 1, 2022.

CONCLUSION:

After April 1, 2022, the position of City Manager will be vacant. While the City Council is actively engaged in a recruitment for a new City Manager, temporary assistance to perform the duties of this interim position is required. CalPERS regulations permit a retired annuitant to be employed by a CalPERS employer, such as the City, so long as the conditions set forth above are met. The attached retired annuitant employment agreement meets all of these conditions. It is therefore recommended that the agreement be executed by the City Council in order to temporarily appoint Mr.

Rosenfield to this interim position
FISCAL IMPACT:

Since Mr. Rosenfield will only be receiving an hourly rate of pay equivalent to his current salary and no additional benefits or compensation, there is a cost savings to the City by appointing him to this position on an interim basis as the budget for the current fiscal year included Mr. Rosenfield’s current pay and benefits.

ATTACHMENTS:
• Proposed Agreement

7.2.1 Packet Pg. 758

Page 1 of 3 ends

1671486.1

RETIRED ANNUITANT EMPLOYMENT AGREEMENT APPOINTING
KENNETH H. ROSENFIELD AS INTERIM CITY MANAGER FOR

THE CITY OF LAGUNA HILLS
THIS AGREEMENT (“Agreement”) is entered into by and between the City of Laguna Hills and Kenneth H. Rosenfield, P.E., (hereinafter referred to as “Interim City Manager” or “Rosenfield”), to be effective the 2
nd day of April 2022, and is made in reference to the following facts.

A. On March 10, 2022, Interim City Manager Kenneth H. Rosenfield, P.E., submitted a letter of resignation indicating his intent to retire from the City, effective April 1, 2022, after nearly 27-years of dedicated public service.

B. After April 1, 2022, the position of City Manager will be vacant while the City Council continues its ongoing recruitment for a new City Manager.

C. During its temporary vacancy, the position of City Manager is designated by the City Council as an interim position of a limited duration that must be filled due to critical business need and desires to do so by appointing a retired annuitant familiar with the ongoing projects and operations of the City.

D. After April 1, 2022, Mr. Rosenfield will be considered a retired annuitant for purposes of CalPERS regulations.

E. The City Council desires to appoint Mr. Rosenfield to the interim vacant position of City Manager for a limited duration while the recruitment for the new City Manager is completed and potentially for a brief transition period thereafter.

THEREFORE, IT IS AGREED AS FOLLOWS:

1.0 Appointment

1.1 The City Council hereby appoints Kenneth H. Rosenfield, P.E., as Interim City Manager of the City to perform the functions and duties specified in the job description for the position of City Manager; and other legally permissible and proper duties and functions as the City Council may, from time to time, assign. The position of Interim City Manager is at-will and serves at the pleasure of the City Council.

1.2 Rosenfield hereby agrees to perform fully and faithfully the functions and duties of Interim City Manager specified in the job description for the position of City Manager; and other legally permissible and proper duties and functions as the City Council may, from time to time, assign.

7.2.1.a
Packet Pg. 759 Attachment: Proposed Agreement (2797 : Temporary Appointment of Interim City Manager)

Page 2 of 3 ends

1671486.1

2.0 Term of Agreement
The term of this Agreement shall commence on April 2, 2022 and shall continue in full force and effect until no later than June 30, 2022, unless terminated with or without cause by either party by providing written notice thereof. The intent of the parties is that this Agreement will be terminated after the appointment of a new City Manager following completion of the formal competitive recruitment process and, potentially, a brief transition period following the appointment.

3.0 Pay Rate

3.1 The Interim City Manager shall receive compensation at the rate of One Hundred Twenty Nine Dollars and Thirty-Three Cents ($129.33) per hour, payable on a bi-weekly basis.

3.2 The Interim City Manager shall not be entitled to receive any benefits of employment provided to City's regular employees, including, but not limited to, group health or medical benefits, life insurance, and vacation and other leave accruals.

4.0 Hours of Work
The hours of the Interim City Manager shall not exceed 960 in a fiscal year.

5.0 General Expenses
The City agrees to reimburse the Interim City Manager for non-personal expenses reasonably and necessarily incurred in the course and scope of performing his duties. The Finance Director is hereby authorized to disburse such monies upon receipt of duly executed expense or petty cash vouchers, receipts, statements or personal affidavits.

6.0 Other Terms and Conditions of Employment
The City Council, in consultation with the Interim City Manager, shall fix any such other terms and conditions of employment, as it may determine from time to time, relating to the performance of the Interim City Manager, provided such terms and conditions are not inconsistent with or in conflict with the provisions of this Agreement or any applicable law.

7.0 Compliance with Law
Interim City Manager shall comply with all applicable laws, ordinances, codes, and regulations of federal, state, and local government in the performance of the duties, which are the subject of this Agreement.

8.0 General Provisions

8.1 The text herein shall constitute the entire Agreement between the parties.

7.2.1.a
Packet Pg. 760 Attachment: Proposed Agreement (2797 : Temporary Appointment of Interim City Manager)

Page 3 of 3 ends

1671486.1

8.2 If any provision, or any portion thereof, contained in this Agreement is held to be invalid or unenforceable, the remainder of this Agreement, or portion thereof, shall be deemed severed, shall not be affected and shall remain in full force and effect.

CITY OF LAGUNA HILLS
_________________________________
Dave Wheeler,
Mayor
Date:_________________

INTERIM CITY MANAGER
__________________________________
Kenneth H. Rosenfield, P.E.

Date:__________________

APPROVED AS TO FORM
_________________________________
Gregory E. Simonian,
City Attorney
Date:_________________
ATTEST:
_____________________________
Melissa Au-Yeung
City Clerk

7.2.1.a
Packet Pg. 761 Attachment: Proposed Agreement (2797 : Temporary Appointment of Interim City Manager) City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 22, 2022
TO: Mayor and Council Members
FROM: David Reynolds
Deputy City Manager/Community Services Director
ISSUE: Permanent Monument Memorializing the 3/5 Dark Horse Marine Battalion
RECOMMENDATION: That the City Council: 1) Receive a presentation from Mike Bland on the installation of an existing Memorial Stone at the Community Center and Sports Complex, and 2) Defer the establishment of a Permanent Monument Memorializing the 3/5 Dark Horse Marine Battalion, pending further evaluation of the needs and opportunities for a monument through a Request for Proposal process for professional services as described herein.

SUMMARY:

At the City Council meeting of February 22, 2022, members of the public1 presented a request to install an existing monument granite slab that honors Marines of the 1st Division, 5th Regiment who gave their lives in the Vietnam conflict (“Memorial Stone”) within the plaza area of the Community Center. Their request was to also place the subject of the installation of the Memorial Stone on a future City Council meeting agenda for further discussion. A history of the Memorial Stone is attached for reference (see Attachment 1). The City Council, at this meeting, directed Staff to bring back a report to the City Council to allow further discussion on the potential installation of the Memorial Stone and on what work efforts have already occurred regarding the

1 Mike Bland, founder and former president of the Laguna Hills Team Dark Horse; Evan Gost, current board member of the Laguna Hills Team Dark Horse; Barry Graham, individual in possession of the Memorial Stone and writer of the attached “History of the Memorial Stone.”

7.3.1 Packet Pg. 762
3/5 Battalion Monument
March 22, 2022

Page 2 ends

establishment of a permanent monument memorializing the 3/5 Darkhouse Marine Battalion.

BACKGROUND:

At the February 22, 2022, City Council meeting, Mr. Mike Bland, and others, addressed the City Council with a request to place this subject matter on a future City Council meeting. The City Council concurred with this request. Prior to that City Council meeting, at its February 2, 2022, meeting, the Parks and Recreation Commission was presented with a request from Mike Bland to install an existing Memorial Stone within the plaza area of the Community Center. His preferred installation locations were near the fountain in the plaza area or the grass area in the plaza area. Below are the Commissioners’ comments related to his request.
• Expand the monument to include all branches of the Military to include a more substantial monument to the armed forces.
• Engrave a phrase or slogan to reference other branches, either on the monument or on a donation bench.
• Installation locations:
- In front of the soccer field, in the flower bed behind the retaining wall. - In front of the Skatepark, along the sidewalk of Paseo De Valencia, near the fencing. There is more visibility from the street and more foot traffic. - At another park in Laguna hills.

City Council and Staff past Work Efforts
In July 2019, the City Council directed Staff to research and propose a process for the design, fabrication, and installation of a permanent memorial for the 3/5 Darkhorse Marine Battalion at the Civic Center. Subsequent to that meeting, Staff met with the City’s Public Art Consultant, Karen Robbins, Chair of Team Darkhorse, and Marine Major Joseph Patterson who was attached to the 3/5 during their historic deployment to Afghanistan. Based on these initial consultations, Staff returned to the City Council on October 8, 2019, with a recommended two-phase approach for completing the memorial project. The City Council, at this meeting, directed Staff to initiate Staff’s recommended two-phased approach completing the installation of a permanent memorial for the City's adopted 3/5 Darkhorse Marine Battalion at the Civic Center. This

7.3.1 Packet Pg. 763