City of Laguna Hills | Local Hazard Mitigation Plan Team 18
Landslide and
mudflow
Previous occurrences
No major landslides
Localized hillside creeping (slow movement) southern area of the City (private property)
Any mudflow events?
Probability of future occurrence – low to medium
El Nino and La Nina events projected to increase
Increase in erosion and flooding
Increase in magnitude and severity of mudflow events
Previous occurrences
Changing weather patterns conditions
Increased precipitation
Drought followed by period of increased precipitation City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 19
Seismic hazards
Description
Primary = earthquakes/ground shaking
Secondary = liquefaction – results from ground shaking causing soils to act like liquid
Location/geographic extent
Ground shaking – citywide
Liquefaction – within defined area (mapped by California Geological Survey)
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 20
City of Laguna Hills | Local Hazard Mitigation Plan Team 21
City of Laguna Hills | Local Hazard Mitigation Plan Team 22
Seismic hazards
Previous occurrences
Northridge; 1994 – 6.7
Chino Hills; 2008 – 5.4
La Habra; 2014 – 5.1
Borrego Springs; 2016 – 5.2
Southwest Santa Cruz Island; 2018 – 5.3
Ridgecrest Sequence; 2019 – 6.4 and 7.1
Probability of future occurrences – high
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 23 Magnitude Elsinore Fault Newport-Inglewood
Fault
Southern San
Andreas Fault San Jacinto Fault San Joaquin
M ≥ 6.7 3.66% 0.70% 19.21% 5.41% 0.42%
M ≥ 7.0 1.82% 0.63% 12.86% 5.39% 0.40%
M ≥ 7.5 0.90% 0.20% 10.21% 5.28% 0.24%
M ≥ 8.0 <0.01% -- 3.24% 2.75% --
Notes:
1. M≥6.7 means magnitude greater than or equal to 6.7, and likewise for the other magnitude thresholds.
2. The 30-year period measured by this report is 2014 to 2044; a 30-year period is the typical duration of a homeowner mortgage.
3. Percentages for fault sections closest to IRWD jurisdiction.
Source: U.S. Department of the Interior and U.S. Geological Survey, The Third California Earthquake Rupture Forecast (UCERF3), Google Earth file with fault probabilities, March 2015.
Severe weather
Description
Heavy rains
Precipitation with an intensity in excess of .30 inches per hour Santa Ana winds
Horizontal flows of air that blow from areas of high pressure to areas of low pressure
Location/geographic extent
Citywide
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 24
Severe weather
Previous occurrences
Heavy rains
December 14, 2021
2018/2019 (heavy rains over consecutive days)
Santa Ana winds
September to May
Probability of future occurrences
Santa Ana winds – high
Heavy rain – high
Changing weather patterns
More extreme wet and dry seasons
Santa Ana winds and dry vegetation – fuel and exacerbate wildfires
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 25
Wildfire and
urban fire
Description
Uncontrolled fire spreading through vegetative fuels
Wildland urban interface – urban and suburban development adjacent to wildland areas
Mixed wildland urban interface – isolated
communities/structures in wildland settings
Occluded wildand urban interface – island of wildland vegetation in urbanized area
Location/geographic extent
No portions of City are located within or immediately adjacent to a Very High Fire Hazard Severity Zone (VHFHSZ) City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 26
City of Laguna Hills | Local Hazard Mitigation Plan Team 27
Wildfire and
urban fire
Previous occurrences
Aliso Viejo Canyon Fire – June 2, 2018
Holy Fire (Trabuco Canyon) – August 6, 2018
Silverado Fire (Loma Ridge) – October 26, 2020
Blue Ridge Fire (Chino Hills) – October 26, 202
Bond Fire (Loma Ridge) – December 2, 2020
Probability of future occurrences – low (in City)
No portions of City are located within or immediately adjacent to a Very High Fire Hazard Severity Zone (VHFHSZ) Changing weather patterns
Increased temperatures and drought can increase frequency, extent, and severity
Drier conditions, more vegetative fuel, longer fire season City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 28
Critical
Facilities and
Facilities of
Concern
Critical: Properties serve important function in
operations of municipal government and in serving the
community
City administration buildings
Water tanks and pumps
Public safety buildings
Bases of operations for maintenance
activities/equipment
Concern: Less vital to safety and well-being
Assembly points
Temporary shelters
Assist in evacuations
Supportive role in preparing for and recovering from
hazard events
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 29
Critical
Facilities and
Facilities of
Concern
Risk assessment will look at what facilities are in hazard zones
Considers their replacement cost and value to the community Mitigation strategies reflect vulnerabilities of critical facilities
Strengthen existing vulnerable facilities
Avoid building new ones in at-risk areas
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 30
Risk
Assessment
Methodology
Geographic area (hazard location)
Population
Critical facilities
Potential damage
Loss estimations
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 31
Risk
Assessment
Example -
Liquefaction
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 32
Risk
Assessment
Example -
Liquefaction
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 33
Capabilities Assessment
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 34
Capabilities
Assessment
Two components
Existing resources and tools to accomplish mitigation and reduce long-term vulnerability
Identification of gaps, conflicts, and/or weaknesses that may need to be addressed through mitigation
Types of capabilities
Planning and regulatory
Administrative and technical
Financial
Education and outreach
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 35
Capabilities
Planning and regulatory
Ordinances
Policies
Local laws and state statutes
Plans and program that guide and manage growth
Questions to consider:
Does the plan address hazards?
Does the plan identify projects to include in the mitigation strategy?
Can the plan be used to implement mitigation actions? How can the capabilities be expanded and improved to reduce risk?
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 36
Capabilities
Administrative and technical
City staff – skills/tools and capacity
Public and private resources
Ability to access and coordinate resources effectively Questions to consider:
Is coordination effective?
Is staffing adequate to enforce regulations?
Is staff trained on hazards and mitigation?
Is coordination between agencies and staff effective? Has the capability been used to assess/mitigate risk in the past?
How can the capabilities be expanded and improved to reduce risk?
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 37
Capabilities
Financial
Resources have or eligible to use to fund mitigation
Staff time, existing operating budgets, impact fees
Local, state and federal funding sources
Questions to consider:
Has the funding resource been used in the past and for what types of activities?
Could the resource be used to fund future mitigation actions? How can the capabilities be expanded and improved to reduce risk?
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 38
Capabilities
Education and Outreach
Programs and methods in place to implement mitigation actions and communicate hazard-related information
Fire safety programs, education programs
Public information or communication activities
Questions to consider:
Has the funding resource been used in the past and for what types of activities?
Could the resource be used to fund future mitigation actions? How can the capabilities be expanded and improved to reduce risk?
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 39
Next Steps
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 40
Planning Team
Provide any information or resources to
Ken Rosenfield and/or Starla Barker
Plans/studies
Policies/programs
Technical data
Intrinsic/historic knowledge
Photos
Asset inventory for loss estimations
Advertise Survey
Provide critical facilities values – facility replacement and contents
Attend Meeting #3 – January 20, 2022
Note change in date for Meeting #4 – February 24,
2022
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 41
Plan
Development
Initiate community outreach
Community survey
Website and social media
Prepare for focused meetings
Traffic Commission – January 19, 2022
Parks and Recreation Commission – February 2, 2022
Finalize hazard profiles
Map critical facilities and hazards
Prepare vulnerability/risk assessment
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 42
Questions/Additional
Discussion
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 43
D e N o v o P l a n n i n g G r o u p
A L a n d U s e P l a n n i n g , D e s i g n , a n d E n v i r o n m e n t a l F i r m
D E N O V O P L A N N I N G G R O U P
180 E a s t M a in S t r e e t, S u it e 1 08 | T u s tin, CA 9278 0 s b a r k e r@den o v o p la nnin g . c om | T EL 9 4 9 3 96 8 1 93
LAGUNA HILLS
LOCAL HAZARD MITIGATION PLAN
HAZARD MITIGATION PLANNING TEAM MEETING #2
Thursday, December 16, 2021
10:00 am – 12:00 pm
MEETING SUMMARY
Attendees: Refer to Attendee Log
Abbreviations
AS = Amy Stonich (City of Lake Forest) PL = Penny Lew (OCPW) CK = Cheryl Kuta (City of RSM) NK = Nardy Khan (OCPW)
DM = Dan Meehan (City of Laguna Hills) SB = Starla Barker (De Novo) JL = Jason Lopez (OCFA) SS = Sherri Seitz (El Toro Water District) KR = Ken Rosenfield (City of Laguna Hills)
Presentation/Discussion:
• Data Needs
o SB: Remember to forward data to KR and/or SB
o KR: WUI plans received from OCFA, KR will forward to SB o SS: secure site to submit plans instead of email?
• SB will set up
• Summary of Hazards/Hazard Profiles
o DAM/RESERVOIR FAILURE
• SS: El Toro Water District facilities are covered on slide. Confirmed Rossmoor Dam is located at Moulton & Ridge Route
• SB: Will reference Annexes prepared for El Toro and Moulton Niguel Water Districts and coordinate with each individually, as needed.
• SB: Any other failures or infrastructure concerns?
- KR: 2009(?) there was a worry about Prado Dam failing; City was notified although unlikely to be impacted.
• NK: safety assessment done by Army Corp of Engineers (ACOE), do have plans for improvement and to raise spillway, 1-2 year construction start date; will send to SB • PL: inundation studies prepared by ACOE; not sure if ACOE shared any studies related to facilities. Dam and inundation studies prepared and approved by Division of Safety of Dams (DSOD) for all dam facilities within jurisdiction; will send to SB • KR: localized flooding off Moulton during recent rain event (F23 overtopped; Del Lago and Moulton). Santa Victoria, less than 1’ of freeboard under bridge, KR has photos
Laguna Hills Local Hazard Mitigation Plan
Hazard Mitigation Planning Team Meeting #2
December 16, 2021
o DROUGHT
• NK: County is required to prepare a plan; CEO office initiating the plan, will forward details to SB
• SS: ETWD has a water shortage contingency plan, new one will become effective in Feb 2022, will forward current to SB
• KR: fire exposure occurs earlier in year, weed abatement fire reduction program late spring early summer, concerned might be out of sequence b/c all weeds cut down in June b/c of legal process, may have to shift timing of operations o FLOOD
• PL: along Aliso Creek, OCFCD has pieces of ownership, but ownership and maintenance not consistent, no studies in progress, some areas have been ID’d for improvement, PL will get back to group
• KR: I-5 to Paseo De Valencia is under OC Parks, then private, then flood control; horizontal portion in NW portion of city was being surveyed – Penny have any info? • PL: not aware of any studies, but will check and let group know • KR: County reinforced channel at Moulton Parkway (overtopped at Moulton & Del Lago) issues with flooding in same area, further east to Del Lago, 15 years ago - Recent flooding on El Toro underpass on I-5, specifically result of BMPs from construction plugging drains
• CK: RSM; no issues besides downed trees
• KR: heard issues in Lake Forest, but not sure
• AS: Lake Forest; several intersections impacted, dealing with lack of BMPs at construction sites
• KR: wind events, lost trees, no property damage, but reason to include in LHMP – regular tree maintenance program needs to continue and always be in place o HUMAN-CAUSED HAZARDS
• SB: Any previous occurrences of spill events to be aware of? • No comments
o LANDSLIDE AND MUDFLOW
• SB: Any concerns?
• KR: nothing came to our attention, has storm control list can send, probably do not rise to level of having to be reported in the LHMP
o SEISMIC HAZARDS
• SB: any significant damage?
• KR: no, nothing aware of
- Civic center and community center refurbished in early 2000s and meet current seismic standards, no concerns about those
- City has about a dozen short span bridges, have not been evaluated for current earthquake standards and recommended retrofits, should be listed in plan as future action for city to take. KR to send list of bridges/Caltrans report
Laguna Hills Local Hazard Mitigation Plan
Hazard Mitigation Planning Team Meeting #2
December 16, 2021
o SEVERE WEATHER
• No comments
o WILDFIRE AND URBAN FIRE
• SB: No mapped or designated VHFHSZs areas. Any concerns? • KR: recently issued new evacuation routes for city (and county?) - What is protocol for choice of shelter in place vs evacuate? - Asking b/c community center ID’d as shelter in place – when is that triggered?
• JL: Goal is to evacuate the least amount of people possible, focus on area most impacted
- Fire most likely in Laguna Canyon away from city, but if Laguna Hills impacted, OCFA and OCSD will coordinate with city’s EOC on evacuations and/or shelter in place (Incident Commander)
- JL to send evacuation maps
• Risk Assessment Methodology
o No comments
• Critical Facilities and Facilities of Concern
o SS: ETWD has 2 lift stations in Laguna Hills, will send SB info o JL: pre-identified evacuation zones if fire near city, nothing else ID’d as shelter in city besides high school, threat doesn’t have to be inside city, could be outside boundaries, shelters must be large enough and central to get info to – how to get info to residents so they understand what’s going on. Will see if can ID any other sites within city and/or near city. o JL: combine EOC with any other cities?
o DM: have own and have not combined in past
o JL: would be rep from OCFA to come to EOC so can disseminate info to residents • Capabilities Assessment
o SB: Anything to be looking at further/aware of?
o No comments
o SB: OCFA interaction with cities in doing emergency planning? o JL: community risk reduction section disseminates info on earthquake prep, any messages cities want to get out, evacuation plans for families, fire prep, also 24/7 PIO at station 27 in Irvine makes announcements via twitter, website, etc.
• Brandy N. – community risk reduction
• Will put in contact with Brandy N. and send info on programs o SB: OCFDC education programs? How does it work at county? o PL: on community scale, have meetings or opportunities for community to provide feedback on projects, have literature to distribute at public events re: community rating systems – example:
encouraging kids not to swim in flood channels
• Also provide to public libraries
• Haven’t had actual event, but do attend fairs, etc.
Laguna Hills Local Hazard Mitigation Plan
Hazard Mitigation Planning Team Meeting #2
December 16, 2021
• Group coordinates with strategic communications groups, will tweet certain messages at beginning of flood season and anything to look out for, messages that are predetermined, some go out on regular basis, every 3-4 months o SB: Water district?
• SS: newsletter, bill inserts, social media, direct mail postcards • Next Steps
o Planning Team
o Plan Development
• Questions/Additional Discussion
• Planning Team Meetings:
o January 20, 2022; 10:00 am – 12:00 pm
o February 24, 2022; 10:00 am – 12:00 pm (NOTE: Change in date)
D e N o v o P l a n n i n g G r o u p
A L a n d U s e P l a n n i n g , D e s i g n , a n d E n v i r o n m e n t a l F i r m
D E N O V O P L A N N I N G G R O U P
180 E a s t M a in S t r e e t, S u it e 1 08 | T u s t in, C A 9278 0 s b a r k e r@den o v o p la nnin g . c om | T EL 9 4 9 3 96 8 1 93
LAGUNA HILLS
LOCAL HAZARD MITIGATION PLAN
HAZARD MITIGATION PLANNING TEAM MEETING #3
Thursday, March 10, 2022
10:00 am – 11:00 am
AGENDA
1. Risk Assessment/Vulnerability Overview
2. Mitigation Strategy Discussion
3. Survey Summary
4. Next Steps
5. Questions/Additional Discussion
Laguna Hills
Local Hazard Mitigation Plan
Planning Team Meeting #3
March 10, 2022
1 First and Last Name Title Organization/Department Present? Ken Rosenfield Interim City Manager/Director
of Public Services City of Laguna Hills X
Amber Shah Associate Civil Engineer City of Laguna Hills X Amy Stonich Assistant Director of Community
Development City of Lake Forest
April Baumbgarten Management Analyst City of Laguna Woods Ashley Melchor Management Assistant City of Lake Forest X Cheryl Kuta Director of Development Services City of Rancho Santa Margarita X Dagian Kokesch Coordinator of Plant Operations
and Safety
MemorialCare Saddleback
Medical Center X
Dan Meehan Community Services
Superintendent City of Laguna Hills X
Dennis Breckner Sergeant
Orange County Sheriff’s
Department Emergency
Management Division
Doug Monfils Director of Facilities,
Maintenance and Construction
Saddleback Valley Unified
School District
Duane Cave External Relations Manager SDG&E
James Tyler Manager - Flood Programs OCPW
Jason Gray Executive Director Saddleback Hospital
Jason Lopez Division 5 Captain OCFA X
Jennifer Pezda Environmental Policy Advisor Southern California Gas Company
Laguna Hills
Local Hazard Mitigation Plan
Planning Team Meeting #3
March 10, 2022
2 First and Last Name Title Organization/Department Present? Jennifer Denmark Facilities Planner Saddleback Valley Unified School District
Joe Hoffman Director of Maintenance,
Operations, and Transportation Irvine Unified School District John McCulloch Lieutenant/Chief of Police
Services
Orange County Sheriff’s
Department Emergency
Management Division
Jonathan Orduna Community Development
Director City of Laguna Niguel
Juan Gonzalez Public Affairs Manager Southern California Gas Company
Kelley Lee Government Relations Manager Southern California Edison Kevin Onuma County Engineer Orange County Public Works
Len Barton Safety & Compliance Coordinator Moulton Niguel Water District Matthew Stiverson Captain OCSD X
Michelle Anderson Emergency Management Division
Director
OCSD/ Emergency
Management Division
Michelle Claud-Clemente Animal Services Manager City of Mission Viejo X Miguel Padilla Maintenance Orange County Department of
Education X
Nardy Khan Deputy Director OCPW
Nick Pivaroff Assistant Fire Marshal OCFA
Omar Dadabhoy Community Development
Director City of Aliso Viejo
Laguna Hills
Local Hazard Mitigation Plan
Planning Team Meeting #3
March 10, 2022
3 First and Last Name Title Organization/Department Present? Paul Catsimanes Emergency Services Manager City of Mission Viejo Penny Lew Senior Civil Engineer OCPW
Pete Carmichael Community Development City of Irvine
Robert Craven Assistant Superintendent SVUSD X
Scott Steinle Sergeant Orange County Sheriff’s
Department
Sharlyn de la Paz Senior Public Safety
Management Analyst City of Lake Forest
Sherri Seitz Public Relations Administrator El Toro Water District Tammi McConnell EMS Director Orange County Health Care
Agency
TJ McGovern Division 5 Chief OCFA
Todd Novacek Director of Operations Moulton Niguel Water District Tony Garcia Facilities Manager Saddleback Hospital
Starla Barker Principal Planner De Novo X
Kelly Hickler Senior Planner De Novo X
There were also two unidentified callers in the meeting.
City of Laguna Hills
Local Hazard Mitigation Plan
Planning Team Meeting #3
March 10, 2022
Agenda
Risk Assessment/Vulnerability Overview
Mitigation Strategy Discussion
Survey Summary
Next Steps
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 2
Risk Assessment/
Vulnerability Overview
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 3
Hazards
Profiled
Climate Change –
integrated into each hazard
Dam/reservoir failure
Drought
Flood
Human-caused hazards
hazardous materials
spills/release
Cyber attack
Seismic and geologic
hazards
Ground shaking
Liquefaction
Landslide
Slope instability
Mudflows
Severe weather
heavy rains
Santa Ana winds
Wildfire and urban fires
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 4
Critical
Facilities &
Facilities of
Concern
City of Laguna Hills | Local Hazard Mitigation Plan Team 5 Critical Facilities – Properties serve an important function in operations of municipal government and in serving the community City administration buildings
water tanks and pumps
public safety buildings
bases of operations for maintenance activities/equipment) Facilities of Concern – Properties that are less vital to safety and well-being, but serve a role during hazard events
assembly points
temporary shelters
assist in evacuations
supportive role in preparing for and recovering from hazard events
Critical
Facilities &
Facilities of
Concern
City of Laguna Hills | Local Hazard Mitigation Plan Team 6 Map ID Name Type Owner/ Responsible Agency Location Critical Facility
Facility of
Concern
Buildings
1 Laguna Hills City Hall/Civic Center (City Hall, Police) Government City 24035 El Toro Road, Laguna Hills X 2 Laguna Hills Community Center & Sports Complex Community City 25555 Alicia Parkway, Laguna Hills X 3 Florence Sylvester Memorial Senior Center Community Age Well Senior Services Inc. 23721 Moulton Parkway, Laguna Hills X 4 Laguna Hills Technology Library Government County of Orange 25555 Alicia Parkway, Laguna Hills X 5 OCFA Station 22 Fire Station OCFA 24001 Paseo de Valencia, Laguna Woods X 6 Memorial Care Saddleback Medical Center Hospital Private Memorial Care 24451 Health Center Drive, Laguna Hills X 7 Laguna Hills Transportation Center Transportation OCTA 24282 Calle de Los Caballeros, Laguna Hills X 8 Laguna Hills High School Public School SVUSD 25401 Paseo de Valencia, Laguna Hills X 9 MNWD Headquarters Water/ Wastewater
Headquarters
MNWD 26161 Gordon Road, Laguna Hills X
Water/Wastewater Infrastructure
10 Mathis Lift Station Sewer ETWD 24853 Paseo de Valencia, Laguna Hills X 11 Veeh Lift Station Sewer ETWD 22988 Santa Vittoria Drive, Laguna Hills X 12 Aliso Hills Reservoir Water MNWD 24773 Mendocino Court X 13 Casa De Oso Pump Station Water MNWD 26593 Meadow Crest Drive X 14 La Paz Underground Pump Station Water MNWD 25322 ½ Cabot Road X 15 Mathis Pump Station Water MNWD 25655 Nellie Gail Lane X 16 Mathis Reservoir 1 & 2 Water MNWD 25655 Nellie Gail Lane X 17 Moulton Lift Station 1 & 2 Sewer MNWD 26112 Moulton Parkway X 18 Nellie Gail Reservoir Water MNWD 25655 Nellie Gail Lane X 19 Valencia Lift Station Sewer MNWD 25659 Cabot Road X
20 Valencia Pump Station 1 & 2 Water MNWD 25480 La Paz Road X Transportation Infrastructure
21 Aliso Creek Bridge (55C0221L) Transportation City S/B Moulton Parkway; 1.5 mile south of El Toro Road
X
22 Aliso Creek Bridge (55C0529R) Transportation City E/B Laguna Hills Drive; 400 feet east of Moulton Parkway
X
23 Aliso Creek (55C0221R) Transportation City N/B Moulton Parkway; 1.5 mile south of El Toro Road
X
24 Narco Channel (55C0495) Transportation City Nellie Gail Road; 0.1 mile south of Oso Parkway X 25 Alicia Creek (55C0237) Transportation City Moulton Parkway; 200 feet northwest of Alicia Parkway
X
26 Aliso Hills Creek Equestrian (55C0238) Transportation City Moulton Parkway; 200 feet north of La Paz Road X 27 La Paz Equestrian (55C0239) Transportation City La Paz Road; 0.2 mile northeast of Moulton Parkway
X
28 Via Lomas (55C0662) Transportation City Via Lomas; 100 feet west of Alicia Parkway X 29 Oso Parkway (55C0056) Transportation Caltrans Oso Parkway; 0.1 mile west of Route I-5 X 30 Aliso Creek (55C0220) Transportation City Paseo De Valencia; 0.8 mile north of Alicia Parkway
X
31 Canada Channel (55C0191) Transportation City Santa Vittoria Drive; 0.2 mile south of Lake Forest Drive
X
32 Canada Channel (55C0549) Transportation City Mill Creek Drive; 0.2 mile south of Lake Forest Drive
X
33 Aliso Creek (55C0529L) Transportation City W/B Laguna Hills Drive; 400 feet east of Moulton Parkway
X
Critical
Facilities &
Facilities of
Concern
7
8 Map ID Name Type Owner/ Responsible Agency Location Critical Facility
Facility of
Concern
Buildings
1 Laguna Hills City Hall/Civic Center (City Hall, Police) Government City 24035 El Toro Road, Laguna Hills X 2 Laguna Hills Community Center & Sports Complex Community City 25555 Alicia Parkway, Laguna Hills X 3 Florence Sylvester Memorial Senior Center Community Age Well Senior Services Inc. 23721 Moulton Parkway, Laguna Hills X 4 Laguna Hills Technology Library Government County of Orange 25555 Alicia Parkway, Laguna Hills X 5 OCFA Station 22 Fire Station OCFA 24001 Paseo de Valencia, Laguna Woods X 6 Memorial Care Saddleback Medical Center Hospital Private Memorial Care 24451 Health Center Drive, Laguna Hills X 7 Laguna Hills Transportation Center Transportation OCTA 24282 Calle de Los Caballeros, Laguna Hills X 8 Laguna Hills High School Public School SVUSD 25401 Paseo de Valencia, Laguna Hills X 9 MNWD Headquarters Water/ Wastewater
Headquarters
MNWD 26161 Gordon Road, Laguna Hills X
Water/Wastewater Infrastructure
10 Mathis Lift Station Sewer ETWD 24853 Paseo de Valencia, Laguna Hills X 11 Veeh Lift Station Sewer ETWD 22988 Santa Vittoria Drive, Laguna Hills X 12 Aliso Hills Reservoir Water MNWD 24773 Mendocino Court X 13 Casa De Oso Pump Station Water MNWD 26593 Meadow Crest Drive X 14 La Paz Underground Pump Station Water MNWD 25322 ½ Cabot Road X 15 Mathis Pump Station Water MNWD 25655 Nellie Gail Lane X 16 Mathis Reservoir 1 & 2 Water MNWD 25655 Nellie Gail Lane X 17 Moulton Lift Station 1 & 2 Sewer MNWD 26112 Moulton Parkway X 18 Nellie Gail Reservoir Water MNWD 25655 Nellie Gail Lane X 19 Valencia Lift Station Sewer MNWD 25659 Cabot Road X
20 Valencia Pump Station 1 & 2 Water MNWD 25480 La Paz Road X Transportation Infrastructure
21 Aliso Creek Bridge (55C0221L) Transportation City S/B Moulton Parkway; 1.5 mile south of El Toro Road
X
22 Aliso Creek Bridge (55C0529R) Transportation City E/B Laguna Hills Drive; 400 feet east of Moulton Parkway
X
23 Aliso Creek (55C0221R) Transportation City N/B Moulton Parkway; 1.5 mile south of El Toro Road
X
24 Narco Channel (55C0495) Transportation City Nellie Gail Road; 0.1 mile south of Oso Parkway
X
25 Alicia Creek (55C0237) Transportation City Moulton Parkway; 200 feet northwest of Alicia Parkway
X
26 Aliso Hills Creek Equestrian (55C0238) Transportation City Moulton Parkway; 200 feet north of La Paz Road
X
27 La Paz Equestrian (55C0239) Transportation City La Paz Road; 0.2 mile northeast of Moulton Parkway
X
28 Via Lomas (55C0662) Transportation City Via Lomas; 100 feet west of Alicia Parkway X 29 Oso Parkway (55C0056) Transportation Caltrans Oso Parkway; 0.1 mile west of Route I-5 X 30 Aliso Creek (55C0220) Transportation City Paseo De Valencia; 0.8 mile north of Alicia Parkway
X
31 Canada Channel (55C0191) Transportation City Santa Vittoria Drive; 0.2 mile south of Lake Forest Drive
X
32 Canada Channel (55C0549) Transportation City Mill Creek Drive; 0.2 mile south of Lake Forest Drive
X
33 Aliso Creek (55C0529L) Transportation City W/B Laguna Hills Drive; 400 feet east of Moulton Parkway
X
Dam/reservoir
failure
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 9 19 –Valencia Lift Station
31 – Canada Channel (55C0191)
32 – Canada Channel (55C0549)
Flood
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 10 10 – Mathis Lift Station
17 – Moulton Lift Station 1&2
21 – Aliso Creek Bridge
(55C0221L0)
22 – Aliso Creek Bridge
(55C0221R)
25 – Alicia Creek (55C010237)
28 –Via Lomas (55C0662)
30 – Aliso Creek (55C0220)
31 – Canada Channel (55C0191)
32 – Canada Channel (55C0549)
33 – Aliso Creek (55C0529L)
Seismic and
Geologic
Hazards -
Earthquake
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 11
Seismic and
Geologic
Hazards -
Landslide
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 12 29 – Oso Parkway (55C0056)
Seismic and
Geologic
Hazards -
Landslide
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 13 Areas of highest susceptibility
13 – Case De Oso Pump Station
30 – Aliso Creek (55C0220)
32 – Canada Channel (55C0549)
Areas of medium to high
susceptibility
2 & 4 – Laguna Hills Community
Center & Sports Complex/Library
17 – Moulton Lift Station
21 – Aliso Creek Bridge
(55C0221L0)
22 – Aliso Creek Bridge
(55C0221R)
23 – Aliso Creek (55C0221L)
24 – Narco Channel (55C0495)
27 – La Paz Equestrian (55C0239)
33 – Aliso Creek (55C0529L)
Seismic and
Geologic
Hazards
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 14 7 – Laguna Hills Transportation
Center
9 – MNWD Headquarters
11 –Veeh Lift Station
17 – Moulton Lift Station 1&2
21 – Aliso Creek Bridge
(55C0221L0)
22 – Aliso Creek Bridge
(55C0221R)
23 – Aliso Creek (55C0221L)
25 – Alicia Creek (55C010237)
26 – Aliso Hills Equestrian
(55C0238)
27 – La Paz Equestrian (55C0239)
28 –Via Lomas (55C0662)
30 – Aliso Creek (55C0220)
31 – Canada Channel (55C0191)
32 – Canada Channel (55C0549)
33 – Aliso Creek (55C0529L)
Wildfire and
urban fire
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 15
Wildfire and
urban fire
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 16 3 – Florence Sylvester Memorial
Senior Center
11 –Veeh Lift Station
31 – Canada Channel (55C0191)
Hazards
Profiled
Climate Change –
integrated into each hazard
Dam/reservoir failure
Drought
Flood
Human-i`aused hazards
Hazardous materials
spills/release
Cyber attack
Seismic and geologic
hazards
Ground shaking
Liquefaction
Landslide
Slope instability
Mudflows
Severe weather
Heavy rains
Santa Ana winds
Wildfire and urban fires
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 17
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 18 Summary of
Vulnerability
MapID Facility Dam Inundation Flood Fire Hazard
Earthquake
Potential Landslide
Landslide
Susceptibility Liquefaction WUI Drought
HumanInduced Severe
Weather
1 Laguna Hills City Hall/Civic Center (City Hall, Police) No No No Yes No No No No Yes Yes Yes 2 Laguna Hills Community Center & Sports Complex No No No Yes No Med-High No No Yes Yes Yes 3 Florence Sylvester Memorial Senior Center No No No Yes No Med No Yes Yes Yes Yes 4 Laguna Hills Technology Library No No No Yes No Med-High No No Yes Yes Yes 5 OCFA Station 22 No No No Yes No No No No Yes Yes Yes
6 Memorial Care Saddleback Medical Center No No No Yes No No No No Yes Yes Yes 7 Laguna Hills Transportation Center No No No Yes No No Yes No Yes Yes Yes 8 Laguna Hills High School No No No Yes No Med No No Yes Yes Yes 9 MNWD Headquarters No No No Yes No No Yes No Yes Yes Yes 10 Mathis Lift Station No Yes No Yes No No No No Yes Yes Yes 11 Veeh Lift Station No No No Yes No No Yes Yes Yes Yes Yes 12 Aliso Hills Reservoir No No No Yes No Med No No Yes Yes Yes 13 Casa De Oso Pump Station No No No Yes No High No No Yes Yes Yes 14 La Paz Underground Pump Station No No No Yes No No No No Yes Yes Yes 15 Mathis Pump Station No No No Yes No No No No Yes Yes Yes 16 Mathis Reservoir 1 & 2 No No No Yes No No No No Yes Yes Yes 17 Moulton Lift Station 1 & 2 No Yes No Yes No Med-High Yes No Yes Yes Yes 18 Nellie Gail Reservoir No No No Yes No No No No Yes Yes Yes 19 Valencia Lift Station Yes No No Yes No No No No Yes Yes Yes 20 Valencia Pump Station 1 & 2 No No No Yes No Med No No Yes Yes Yes 21 Aliso Creek Bridge (55C0221L) No Yes No Yes No Med-High Yes No Yes Yes Yes 22 Aliso Creek Bridge (55C0529R) No Yes No Yes No Med-High Yes No Yes Yes Yes 23 Aliso Creek (55C0221R) No No No Yes No Med-High Yes No Yes Yes Yes 24 Narco Channel (55C0495) No No No Yes No Med-High No No Yes Yes Yes 25 Alicia Creek (55C0237) No Yes No Yes No No Yes No Yes Yes Yes 26 Aliso Hills Creek Equestrian (55C0238) No No No Yes No No Yes No Yes Yes Yes 27 La Paz Equestrian (55C0239) No No No Yes No Med-High Yes No Yes Yes Yes 28 Via Lomas (55C0662) No Yes No Yes No No Yes No Yes Yes Yes 29 Oso Parkway (55C0056) No No No Yes Yes High No No Yes Yes Yes 30 Aliso Creek (55C0220) No Yes No Yes No No Yes No Yes Yes Yes 31 Canada Channel (55C0191) Yes Yes No Yes No High Yes Yes Yes Yes Yes 32 Canada Channel (55C0549) Yes Yes No Yes No No Yes No Yes Yes Yes 33 Aliso Creek (55C0529L) No Yes No Yes No Med-High Yes No Yes Yes Yes Page 379 of 542 Mitigation Strategy
Discussion
Mitigation
Strategies
Mitigation actions – reduce or eliminate long-term risk Different from actions to prepare or respond to an
event
Mitigation activities lessen or eliminate the need for preparedness or response resources
Emphasis on the impact or vulnerabilities – not on the hazard itself
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 20
Mitigation
Actions
Identify issues or concerns specific to each hazard
Identify potential mitigation actions to address the
issue/concern
City of Laguna Hills | Local Hazard Mitigation Plan Team 21
STAPLE/E
Review and
Selection
Criteria
City of Laguna Hills | Local Hazard Mitigation Plan Team 22 Social
• Is the proposed action socially acceptable to the jurisdiction and surrounding community? • Are there equity issues involved that would mean that one segment of the jurisdiction and/or community is treated unfairly?
• Will the action cause social disruption?
Technical
• Will the proposed action work?
• Will it create more problems than it solves?
• Does it solve a problem or only a symptom?
• Is it the most useful action in light of other jurisdiction goals? Administrative
• Can the jurisdiction implement the action?
• Is there someone to coordinate and lead the effort?
• Is there sufficient funding, staff, and technical support available? • Are there ongoing administrative requirements that need to be met? Political
• Is the action politically acceptable?
• Is there public support both to implement and to maintain the project?
STAPLE/E
Review and
Selection
Criteria
City of Laguna Hills | Local Hazard Mitigation Plan Team 23 Legal
• Is the jurisdiction authorized to implement the proposed action? • Are there legal side effects? Could the activity be construed as a taking? • Will the jurisdiction be liable for action or lack of action? • Will the activity be challenged?
Economic
• What are the costs and benefits of this action?
• Do the benefits exceed the costs?
• Are initial, maintenance, and administrative costs taken into account? • Has funding been secured for the proposed action? If not, what are the potential funding sources (public, nonprofit, and private)?
• How will this action affect the fiscal capability of the jurisdiction? • What burden will this action place on the tax base or local economy? • What are the budget and revenue effects of this activity? • Does the action contribute to other jurisdiction goals? • What benefits will the action provide?
Environmental
• How will the action affect the environment?
• Will the action need environmental regulatory approvals? • Will it meet local and state regulatory requirements? • Are endangered or threatened species likely to be affected?
Mitigation
Prioritization &
Timeframe
City of Laguna Hills | Local Hazard Mitigation Plan Team 24 Category Comments
High
Top organizational priority and is generally a well-detailed project idea. Protects population, resource or property at high risk. Uses feasible methods, techniques or technology.
Medium A good idea that needs more information or is an action that addresses a moderate hazard.
Low An idea that needs a lot more information or will take a lot of preliminary action to build support.
Category Timeframe
Short-term 1-2 years
Mid-term 3 years
Long-term 4-5 years
Ongoing 1-2 years and ongoing thereafter
Survey Summary
Survey
Summary
Survey
38 responses
Survey Respondents
71% live in Laguna Hills; 29% work in Laguna Hills, 18.5% visit Laguna Hills, but live and work elsewhere
Majority of respondents 35 years of age and above with largest group 35-44 years of age
City of Laguna Hills | Local Hazard Mitigation Plan Team 26
Survey
Summary
Most common hazards
experienced:
High winds
Heavy rain
Extreme heat
Earthquake
Power outage
Hazards most concerned
about:
Drought
Extreme heat
Earthquake
Wildfire
Power outage
Likelihood of potential threat
to Laguna Hills:
Earthquake
Extreme heat
High winds
Wildfire
Hazard not listed above that
you think is a wide scale
threat to Laguna Hills:
Pandemic
Cyber threats
Alien attack
City of Laguna Hills | Local Hazard Mitigation Plan Team 27
Survey
Summary
Most households said they are somewhat prepared to deal with a hazard event
Actions have been taken to make their homes, business or neighborhood more resistant to hazards
Email is the top choice for method to receive information Majority said best thing the City, County, or Agencies can do to help them become better prepared is to provide effective emergency notifications and communications in a disaster City of Laguna Hills | Local Hazard Mitigation Plan Team 28
Next Steps
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 29
Next Steps
Complete Draft LHMP for Planning Team Review
Planning Team Review of LHMP
Anticipated April
Revise LHMP for Public Review
Public Review
Anticipated May
Submit to Cal OES
Anticipated June
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 30
Questions/Additional
Discussion
City of Laguna Hills LHMP | Hazard Mitigation Plan Team Meeting 31
D e N o v o P l a n n i n g G r o u p
A L a n d U s e P l a n n i n g , D e s i g n , a n d E n v i r o n m e n t a l F i r m
D E N O V O P L A N N I N G G R O U P
180 E a s t M a in S t r e e t, S u it e 1 08 | T u s tin, CA 9278 0 s b a r k e r@den o v o p la nnin g . c om | T EL 9 4 9 3 96 8 1 93
LAGUNA HILLS
LOCAL HAZARD MITIGATION PLAN
HAZARD MITIGATION PLANNING TEAM MEETING #2
Thursday, March 10, 2022
10:00 am – 11:00 pm
MEETING SUMMARY
Attendees: Refer to Attendee Log
Abbreviations
AS = Amber Shah (City of Laguna Hills)
JL = Jason Lopez (OCFA)
KR = Ken Rosenfield (City of Laguna Hills)
MS = Matt Stiverson (OCSD)
SB = Starla Barker (De Novo)
SB – Any comments on evacuation procedures?
• JL:
o OCFA will rely on staff at evacuation facility
o Sometimes it’s better to leave people in place
o Will determine best course of action based on event
o Wind will move smoke away from city towards laguna wilderness o Ready Set Go – having a plan before event happens
SB – Any comments on fire prevention?
• JL:
o ocfa.org shows how to prepare structure, clearance around structure o 100 ft of clearance recommended
o Enforcement through prevention services and city code enforcement working hand in hand o Make sure to enforce state regulations re: fire prevention SB – Does fire have input on bridge facilities?
• JL:
o Earthquake – what are key areas to look at first
o ID potential problems and what do we need to mitigate those problems o Target areas, windshield survey – unit will drive around and ID high risk structures o Structural specialists available, more often will shut down bridge until someone can evaluate it o First thing they do is evaluate
SB – Access limitations in wildland interface?
• JL:
o Wildland interface a bit more dynamic
Laguna Hills Local Hazard Mitigation Plan
Hazard Mitigation Planning Team Meeting #3
March 10, 2022
o Most of time fire is moving away from wildland areas, nothing ID’d as problem for getting people out because small and not as populated
o Emerald Fire was quite a ways away from city
o Law enforcement has a lot more resources, we will help them with evacuations SB – Anything else to be aware of?
• KR – has not received any other input
• JL – did City utilize Alert OC for survey?
o AS not familiar with how those alerts go out
o MS – facilitates alert system for city
o Have never used system for something like this before, but can talk it over with KR o If acceptable use of alert OC, then ok
o Traditional use has only been for emergency messaging, other versions of system, in which other cities have used to make non-emergency announcements o Would be unusual use of system
o Another opportunity through Nixel, etc.?
o MS can use Emergency Services social media to push notifications o MS and AS will work together on additional survey notifications. Will take screenshots of social media posts, and share any other analytics
B2 Community Outreach
CITY OF LAGUNA HILLS
TRAFFIC COMMISSION
REGULAR MEETING AGENDA
Wednesday, January 19, 2022 – 7:00 PM
Anna Lisa Lukes - Chair
Chris Bieber - Vice Chair Susan Caskey - Commissioner
Manuel Hernandez - Commissioner Mark Schaff - Commissioner Location: City Council Chamber, 24035 El Toro Road, Laguna Hills, CA 92653 Any person wishing to address the Traffic Commission on any matter, whether or not it appears on this Agenda, is asked to complete a “Request to Speak” form available on the table at the back of the Chamber. The completed form is to be submitted to the Recording Secretary prior to an individual being heard by the Traffic Commission. Completion of the form is voluntary. All persons may attend the meeting regardless of whether this form is completed.
Members of the public wishing to address the Traffic Commission can do so during the Public Comments portion of the Agenda with a time limitation of three minutes per person, an overall time limit of ten minutes for any one subject, and a total time limit of thirty minutes for Public Comments. If you are commenting on an Agenda item, your comments will be heard at the time that item is scheduled on the Agenda. If you are addressing the Commission on an item not listed on the Agenda, the Traffic Commission is prohibited by law from discussing or taking any action on that item.
CALL TO ORDER
Resolution No. 96-04-09-1 established rules of decorum for public meetings held by the City of Laguna Hills. Resolution No. 96-04-09-1 is available on the table at the back of the City Council Chamber.
PLEDGE OF ALLEGIANCE
ROLL CALL OF COMMISSION MEMBERS
1. PUBLIC COMMENTS
This is the time to address the Traffic Commission on any matter not listed on this Agenda that is within the subject matter jurisdiction of the Commission. Public Comments are limited to three minutes per person, an overall time limit of ten minutes for any one subject, and a total time limit of thirty minutes.
2. MINUTES
2.1 Approval of Minutes
Recommendation: That the Traffic Commission approve the Minutes for the September 15, 2021, Traffic Commission Meeting.
City of Laguna Hills Traffic Commission Wednesday, January 19, 2022 Regular Meeting Agenda
2 3. PRESENTATIONS
4. ADMINISTRATIVE REPORTS
4.1 Nellie Gail Road Equestrian Crossing Update of Improvements and Consideration of a Raised Intersection
Recommendation: That the Traffic Commission review the status of improvements made and pending at the Nellie Gail Road Equestrian Crossing at the Nellie Gail Ranch Owners Association Equestrian Center Driveway and discuss the merits of a Raised Intersection or Split Raised Intersection at this location.
4.2 Development of a Citywide Local Hazard Mitigation Plan Recommendation: That the Traffic Commission discuss the development of the City's Local Hazard Mitigation Plan and provide input on any hazards of concern in the community to be evaluated and mitigated.
4.3 Residential Parking Permit Program on Streets in the Lomas Laguna Residential Neighborhood South of Alicia Parkway
Recommendation: That the Traffic Commission recommend to the City Council the establishment of a Permit Parking Program in the Lomas Laguna Neighborhood.
4.4 FHWA Traffic Signal Backplates with Retroreflective Borders Recommendation: That the Traffic Commission receive and file the report.
5. INFORMATIONAL ITEMS
5.1. Sheriff's Department Verbal Report
5.2 Radar Trailer Calendar
Recommendation: That the Traffic Commission receive and file the report.
6. COMMISSIONER COMMENTS
7. ADJOURNMENT
The next Regular Meeting of the Traffic Commission will be March 16, 2022 at 7:00 p.m. in the City Council Chamber, located at 24035 El Toro Road, Laguna Hills California.
City of Laguna Hills Traffic Commission Wednesday, January 19, 2022 Regular Meeting Agenda
3 CERTIFICATION
I, KENNETH H. ROSENFIELD, Interim City Manager/Director of Public Services of the City of Laguna Hills, do hereby certify that a copy of the foregoing Agenda was posted at Laguna Hills City Hall, Laguna Hills Community Center, and the Courtyard at La Paz Center by January 14, 2022, at 5:00 p.m.
January 13, 2022
Interim City Manager/Director of Public Services Date
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, you should contact the office of the Director of Public Services at (949) 707-2650. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to assure access.
Materials related to an item on this Agenda submitted to the Commission after distribution of the Agenda packet are available for public inspection in the Public Services Department at 24035 El Toro Road, Laguna Hills, California, during normal business hours.
City of Laguna Hills
Local Hazard Mitigation Plan
Transportation Commission
January 19, 2022
Agenda
Introductions
What is hazard mitigation planning?
Why is the City preparing a LHMP?
What is the LHMP planning process?
Hazard discussion
Community outreach/input
Next steps
City of Laguna Hills LHMP | Transportation Commission 2
What is Hazard
Mitigation Planning?
City of Laguna Hills LHMP | Transportation Commission 3
• Sustained actions taken to reduce or
eliminate long-term risk to life and property
from hazards
What is Hazard Mitigation?
• A plan based on a community’s values and
needs
• Results from a process-oriented approach
• Focuses on mitigation strategies (making the
future safer)
What is a Hazard Mitigation Plan?
City of Laguna Hills LHMP | Transportation Commission 4 Hazard
Mitigation
Why is the City
Preparing a Hazard
Mitigation Plan?
City of Laguna Hills LHMP | Transportation Commission 5
Why Prepare a
LHMP?
To reduce losses from natural/human-induced hazards
To make our community more “disaster resistant”
Speed disaster recovery and redevelopment
Support other City programs/initiatives
Reduce burden on local governments and tax payers
Maintain eligibility for federal funds for pre-disaster mitigation planning
City of Laguna Hills LHMP | Transportation Commission 6 A Hazard Mitigation Plan demonstrates the jurisdiction’s commitment to reducing risks from natural hazards and serves as a guide for decision-makers as they commit resources to minimize the effects of natural hazards.
What the
LHMP provides
A comprehensive assessment of risk to support
proposed mitigation strategies
Detailed action plan the City, in coordination with its partners, will implement to reduce risk to natural
hazards
Access to Federal mitigation funding
Support of other City programs and initiatives
Coordination of mitigation efforts
City of Laguna Hills LHMP | Transportation Commission 7
What is the LHMP
Planning Process?
City of Laguna Hills LHMP | Transportation Commission 8
Planning
Process
Organize
Resources
Assess
Risks
Develop a
Mitigation
Plan
Implement
Plan and
Monitor
Progress
City of Laguna Hills LHMP | Transportation Commission 9 We are here
LHMP
Development
Describe
Hazards
• Type,
location,
extent
• Previous
occurrences
• Probability of
future events
Identify
Community
Assets
• People
• Economy
• Built
environment
• Natural
environment
Analyze Risk
• Evaluate
vulnerable
assets
• Describe
potential
impacts
• Estimate
losses
City of Laguna Hills LHMP | Transportation Commission 10 Summarize and Document Risk Assessment
Hazards
Identified for
Evaluation
Dam/reservoir failure
Drought
Flood
Human-caused hazards
hazardous materials
spills/release
Landslides and mudflow
City of Laguna Hills LHMP | Transportation Commission 11
Hazards
Identified for
Evaluation
Seismic hazards
ground shaking
liquefaction
Severe weather
heavy rains
Santa Ana winds
Wildfire and urban fires
City of Laguna Hills LHMP | Transportation Commission 12
Mitigation
Strategy
Evaluate and prioritize
goals and mitigation
actions to reduce or avoid
long-term vulnerabilities
associated with each
hazard
Goals: What long
term outcomes do
you want to
achieve?
Actions:What specific actions
will local government, community
organizations, and others take to
reduce risks to hazards?
Action Plan: How
will the actions be
prioritized and
implemented?
City of Laguna Hills LHMP | Transportation Commission 13
Mitigation
Examples
Local plans and regulations General Plan Zoning ordinances Subdivision regulations Building codes Capital improvement programs Structure and infrastructure projects Acquisition, relocation, elevation of flood -
prone structures
Levees and floodwalls Seismic retrofitting Strengthening critical facilities Burying utility lines Stormwater diversion, retention, or detention
City of Laguna Hills LHMP | Transportation Commission 14
Mitigation
Examples
Natural Systems Protection Floodplain protection Wetlands preservation Coastal or riverine setbacks Sediment and erosion control Forest and vegetative management Education and Awareness Programs Risk communication Community events Brochures/written materials Website with maps/information Educational programs City of Laguna Hills LHMP | Transportation Commission 15
Hazard Discussion
City of Laguna Hills LHMP | Transportation Commission 16
Hazard
Discussion
Any missing hazards that should be addressed?
Any experience with specific listed hazards?
What was the impact of the hazard?
Were preventative measures implemented to
address future events?
What is your biggest concern in the event of a
hazard event?
Any recommended mitigation actions/ideas that
should be considered to reduce the
risk/vulnerability of the hazard and improve
recovery time?
City of Laguna Hills LHMP | Transportation Commission 17
Hazards
Identified for
Evaluation
Climate Change –
integrated into each hazard
Dam/reservoir failure
Drought
Flood
Human-caused hazards
hazardous materials
spills/release
Landslides and mudflow
Seismic hazards
ground shaking
liquefaction
Severe weather
heavy rains
Santa Ana winds
Wildfire and urban fires
City of Laguna Hills LHMP | Transportation Commission 18
Community
Outreach/Input
City of Laguna Hills LHMP | Transportation Commission 19
Community
Outreach/Input
Webpage
News Flash • Laguna Hills, CA • CivicEngage (laguna-hills.ca.us) Meetings
Transportation Commission – January 19
Parks and Recreation Commission – February 2
Survey – Please complete the survey!
City of Laguna Hills Local Hazard Mitigation Plan (LHMP) Survey (surveymonkey.com)
Public Review Draft LHMP
City of Laguna Hills LHMP | Transportation Commission 20
Next Steps
City of Laguna Hills LHMP | Transportation Commission 21
Plan
Development
Draft LHMP for Public Review
Estimated April 2022
Revise Draft LHMP and submit to Cal OES/FEMA
June 2022
City Council Adoption
Fall 2022
City of Laguna Hills LHMP | Transportation Commission 22 Continued Opportunities
for Community Input
On-going website updates
Questions
City of Laguna Hills LHMP | Transportation Commission 23
CITY OF LAGUNA HILLS
PARKS & RECREATION COMMISSION
REGULAR MEETING AGENDA
Wednesday, February 2, 2022 – 7:00 PM
Dan Cooper - Chair
Julie Nassif - Vice Chair Patricia Thee - Commissioner
Sanjay Mathur - Commissioner Neel Patel - Commissioner
Location: City Council Chamber, 24035 El Toro Road, Laguna Hills, CA 92653 Any person wishing to address the Parks and Recreation Commission on any matter, whether or not it appears on this Agenda, is asked to complete a “Request to Speak” form available on the table at the back of the Chamber. The completed form is to be submitted to the Recording Secretary prior to an individual being heard by the Parks and Recreation Commission.
Members of the public wishing to address the Parks and Recreation Commission can do so during the Public Comments portion of the Agenda with a time limitation of three minutes per person, an overall time limit of ten minutes for any one subject, and a total time limit of thirty minutes for Public Comments. If you are commenting on an Agenda item, your comments will be heard at the time that item is scheduled on the Agenda. If you are addressing the Commission on an item not listed on the Agenda, the Parks and Recreation Commission is prohibited by law from discussing or taking any action on that item.
CALL TO ORDER
Resolution No. 96-04-09-1 established rules of decorum for public meetings held by the City of Laguna Hills. Resolution No. 96-04-09-1 is available on the table at the back of the City Council Chamber.
PLEDGE OF ALLEGIANCE
ROLL CALL OF COMMISSIONER MEMBERS
ELECTION OF CHAIR
Recommendation: That the Parks and Recreation Commission elect a new Chair.
ELECTION OF VICE CHAIR
Recommendation: That the Parks and Recreation Commission elect a new Vice Chair.
1. PUBLIC COMMENTS
This is the time to address the Parks and Recreation Commission on any matter not listed on this Agenda that is within the subject matter jurisdiction of the Commission. Public Comments are limited to three minutes per person, an
City of Laguna Hills Parks & Recreation Commission Wednesday, February 2, 2022 Regular Meeting Agenda
2 overall time limit of ten minutes for any one subject, and a total time limit of thirty minutes.
2. MINUTES APPROVAL
2.1 Approval of Minutes for the December 1, 2021
Recommendation: That the Parks and Recreation Commission approve the minutes for the December 1, 2021, regular meeting.
3. PRESENTATIONS
3.1 Monument to the 3/5 and 2/4 Marines KIA During the Vietnam War Recommendation: That the Parks and Recreation Commission receive a presentation from Team Dark Horse founder Mike Bland regarding a recommendation to place a marine monument at the Laguna Hills Community Center.
4. ADMINISTRATIVE REPORTS
4.1 Park Quality Control Program Update
Recommendation: That the Parks and Recreation Commission receive an update from Parks Supervisor Ryan Hanley.
4.2 Development of Citywide Local Hazard Mitigation
Recommendation: That the Parks and Recreation Commission discuss the development of the City's Local Hazard Mitigation Plan and provide input on any hazards of concern in the community to be evaluated and mitigated.
4.3 2021 Community Services Department Year End Report
Recommendation: That the Parks and Recreation Commission receive and file the report.
5. INFORMATIONAL ITEMS
6. COMMISSIONER COMMENTS
City of Laguna Hills Parks & Recreation Commission Wednesday, February 2, 2022 Regular Meeting Agenda
3 7. ADJOURNMENT
The next Regular Meeting of the Parks & Recreation Commission will be April 6, 2022 at 7:00 p.m. in the City Council Chamber, located at 24035 El Toro Road, Laguna Hills California
CERTIFICATION
I, DAVID T. REYNOLDS, Deputy City Manager of the City of Laguna Hills, do hereby certify that a copy of the foregoing Agenda was posted at Laguna Hills City Hall, Laguna Hills Community Center, and the Courtyard at La Paz Center by January 27, 2022, at 5:00 p.m.
David T. Reynolds; Deputy City Manager January 27, 2022 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, you should contact the office of the Deputy City Manager at (949) 707-2680. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to assure accessibility to this meeting.
Materials related to an item on this Agenda submitted to the Commission after distribution of the agenda packet are available for public inspection in the Community Center at 25555 Alicia Parkway, Laguna Hills, California, during normal business hours.
City of Laguna Hills
Local Hazard Mitigation Plan
Parks and Recreation Commission
February 2, 2022
Agenda
Introductions
What is hazard mitigation planning?
Why is the City preparing a LHMP?
What is the LHMP planning process?
Hazard discussion
Community outreach/input
Next steps
City of Laguna Hills LHMP | Parks and Recreation Commission 2
What is Hazard
Mitigation Planning?
City of Laguna Hills LHMP | Parks and Recreation Commission 3
• Sustained actions taken to reduce or
eliminate long-term risk to life and property
from hazards
What is Hazard Mitigation?
• A plan based on a community’s values and
needs
• Results from a process-oriented approach
• Focuses on mitigation strategies (making the
future safer)
What is a Hazard Mitigation Plan?
City of Laguna Hills LHMP | Parks and Recreation Commission 4 Hazard
Mitigation
Why is the City
Preparing a Hazard
Mitigation Plan?
City of Laguna Hills LHMP | Parks and Recreation Commission 5
Why Prepare a
LHMP?
To reduce losses from natural/human-induced hazards
To make our community more “disaster resistant”
Speed disaster recovery and redevelopment
Support other City programs/initiatives
Reduce burden on local governments and tax payers
Maintain eligibility for federal funds for pre-disaster mitigation planning
City of Laguna Hills LHMP | Parks and Recreation Commission 6 A Hazard Mitigation Plan demonstrates the jurisdiction’s commitment to reducing risks from natural hazards and serves as a guide for decision-makers as they commit resources to minimize the effects of natural hazards.
What the
LHMP provides
A comprehensive assessment of risk to support
proposed mitigation strategies
Detailed action plan the City, in coordination with its partners, will implement to reduce risk to natural
hazards
Access to Federal mitigation funding
Support of other City programs and initiatives
Coordination of mitigation efforts
City of Laguna Hills LHMP | Parks and Recreation Commission 7
What is the LHMP
Planning Process?
City of Laguna Hills LHMP | Parks and Recreation Commission 8
Planning
Process
Organize
Resources
Assess
Risks
Develop a
Mitigation
Plan
Implement
Plan and
Monitor
Progress
City of Laguna Hills LHMP | Parks and Recreation Commission 9 We are here
LHMP
Development
Describe
Hazards
• Type,
location,
extent
• Previous
occurrences
• Probability of
future events
Identify
Community
Assets
• People
• Economy
• Built
environment
• Natural
environment
Analyze Risk
• Evaluate
vulnerable
assets
• Describe
potential
impacts
• Estimate
losses
City of Laguna Hills LHMP | Parks and Recreation Commission 10 Summarize and Document Risk Assessment
Hazards
Identified for
Evaluation
Dam/reservoir failure
Drought
Flood
Human-caused hazards
hazardous materials
spills/release
Landslides and mudflow
City of Laguna Hills LHMP | Parks and Recreation Commission 11
Hazards
Identified for
Evaluation
Seismic hazards
ground shaking
liquefaction
Severe weather
heavy rains
Santa Ana winds
Wildfire and urban fires
City of Laguna Hills LHMP | Parks and Recreation Commission 12
Mitigation
Strategy
Evaluate and prioritize
goals and mitigation
actions to reduce or avoid
long-term vulnerabilities
associated with each
hazard
Goals: What long
term outcomes do
you want to
achieve?
Actions:What specific actions
will local government, community
organizations, and others take to
reduce risks to hazards?
Action Plan: How
will the actions be
prioritized and
implemented?
City of Laguna Hills LHMP | Parks and Recreation Commission 13
Mitigation
Examples
Local plans and regulations General Plan Zoning ordinances Subdivision regulations Building codes Capital improvement programs Structure and infrastructure projects Acquisition, relocation, elevation of flood -
prone structures
Levees and floodwalls Seismic retrofitting Strengthening critical facilities Burying utility lines Stormwater diversion, retention, or detention
City of Laguna Hills LHMP | Parks and Recreation Commission 14
Mitigation
Examples
Natural Systems Protection Floodplain protection Wetlands preservation Coastal or riverine setbacks Sediment and erosion control Forest and vegetative management Education and Awareness Programs Risk communication Community events Brochures/written materials Website with maps/information Educational programs City of Laguna Hills LHMP | Parks and Recreation Commission 15
Hazard Discussion
City of Laguna Hills LHMP | Parks and Recreation Commission 16
Hazard
Discussion
Any missing hazards that should be addressed?
Any experience with specific listed hazards?
What was the impact of the hazard?
Were preventative measures implemented to
address future events?
What is your biggest concern in the event of a
hazard event?
Any recommended mitigation actions/ideas that
should be considered to reduce the
risk/vulnerability of the hazard and improve
recovery time?
City of Laguna Hills LHMP | Parks and Recreation Commission 17
Hazards
Identified for
Evaluation
Climate Change –
integrated into each hazard
Dam/reservoir failure
Drought
Flood
Human-caused hazards
hazardous materials
spills/release
Landslides and mudflow
Seismic hazards
ground shaking
liquefaction
Severe weather
heavy rains
Santa Ana winds
Wildfire and urban fires
City of Laguna Hills LHMP | Parks and Recreation Commission 18
Community
Outreach/Input
City of Laguna Hills LHMP | Parks and Recreation Commission 19
Community
Outreach/Input
Webpage
News Flash • Laguna Hills, CA • CivicEngage (laguna-hills.ca.us) Meetings
Transportation Commission – January 19
Parks and Recreation Commission – February 2
Survey – Please complete the survey!
City of Laguna Hills Local Hazard Mitigation Plan (LHMP) Survey (surveymonkey.com)
Public Review Draft LHMP
City of Laguna Hills LHMP | Parks and Recreation Commission 20
Next Steps
City of Laguna Hills LHMP | Parks and Recreation Commission 21
Plan
Development
Draft LHMP for Public Review
Estimated April 2022
Revise Draft LHMP and submit to Cal OES/FEMA
June 2022
City Council Adoption
Fall 2022
City of Laguna Hills LHMP | Parks and Recreation Commission 22 Continued Opportunities
for Community Input
On-going website updates
Questions
City of Laguna Hills LHMP | Parks and Recreation Commission 23
City of Laguna Hills
Local Hazard Mitigation Plan
Chamber of Commerce
July 18, 2024
Agenda
City of Laguna Hills LHMP 2
Introductions
Meeting Purpose
How Does Laguna Hills Prepare for Hazards?
Discussion
Introductions
City of Laguna Hills LHMP 3
We want to know YOUR experience with
and thoughts about hazards in Laguna Hills
Impacts of hazards on businesses
City of Laguna Hills LHMP 4
Purpose of
Our Meeting
Today
What is a
LHMP?
Local • Specific to the City of Laguna Hills
• Identifies hazards, likelihood of Hazard occurring, and community’s risk • Finds ways to lessen the risks and Mitigation make these hazards less harmful • Long-term policies and actions to Plan increase resilience and reduce risk City of Laguna Hills LHMP 5
Why is the
City Preparing
a Hazard
Mitigation Plan?
To reduce losses from natural/human-induced hazards
To make our community more “disaster resistant” Speed disaster recovery and redevelopment Support other City programs/initiatives Reduce burden on local governments and tax payers Maintain eligibility for federal funds for pre-disaster mitigation planning
City of Laguna Hills LHMP 6
A Hazard Mitigation Plan demonstrates the jurisdiction’s commitment to reducing risks from natural hazards and serves as a guide for decision-makers as they commit resources to minimize the effects of natural hazards.
Hazards
Identified for
Evaluation
City of Laguna Hills LHMP 7
Discussion
City of Laguna Hills LHMP 8
Discussion
Questions
Do you have any personal experiences with these hazards in Laguna Hills?
What are the most likely types of hazards that could affect you/your business and do you feel prepared for them?
What is your biggest concern about any of these hazards or in an emergency?
What actions could be put in place to help reduce the
concern?
Do you know where to find information about hazards and emergencies in Laguna Hills?
City of Laguna Hills LHMP 9
Next Steps
Cal OES Review of Draft LHMP
Revise based on comments
FEMA Review of Draft LHMP
Receive approvable pending adoption
City Council consideration of LHMP for adoption
Receive final approval from FEMA
City of Laguna Hills LHMP 10
Thank You!
Input from today’s meeting helps us create the Draft
Plan
We revise the Draft Plan based on your feedback and
share it with:
California Governor’s Office of Emergency Services
Federal Emergency Management Agency
Laguna Hills City Council
City of Laguna Hills LHMP 11
1 [email protected]
From: Joe Ames <[email protected]>
Sent: Tuesday, July 16, 2024 12:14 PM
To: [email protected]; [email protected]; Samantha Vu Subject: RE: Invitation from the City of Laguna Hills - Development of a Local Hazard Mitigation Plan
Attachments: Community Services Providers Outreach Distribution list.txt I sent the below e-mail to the attached distribution list via BCC.
Joe Ames, P.E., T.E.
Public Works Director / City Engineer
City of Laguna Hills
24035 El Toro Road, Laguna Hills, CA 92653
Phone (949) 707-2655 | Fax (949) 707-2633
[email protected]
From: Joe Ames
Sent: Tuesday, July 16, 2024 12:06 PM
To: Joe Ames <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; Samantha Vu <[email protected]> Subject: Invitation from the City of Laguna Hills - Development of a Local Hazard Mitigation Plan Dear Community Services Provider:
The City of Laguna Hills is preparing a Local Hazard Mitigation Plan (LHMP) with the assistance of De Novo Planning Group.
A LHMP is a Federal Emergency Management Agency (FEMA)-approved plan that identifies natural hazards with the potential to impact a community, discusses the risks to the community associated with the natural hazards, and identifies mitigation actions to reduce the risks. A FEMA-approved plan provides opportunities for the City to seek grant funding for hazard mitigation activities.
We are seeking involvement from the community to help inform the plan.
In addition to addressing impacts to the community at large, the plan will identify vulnerable populations that could be more significantly impacted in the event of a natural hazard.
The City would like to host a meeting with service providers and organizations who work with underserved and vulnerable populations to provide an overview of the plan and obtain input specific to the natural hazards, vulnerabilities and risks, and potential mitigation actions specific to vulnerable populations.
We kindly ask you or a representative from your agency/organization to participate in the meeting, which will be held via Zoom:
Date: Thursday, July 25, 2024
Time: 10:00 am – 11:00 am
2 Location: Zoom Meeting Appointment to Follow
Please confirm your attendance by responding to this email so that we may send you the meeting appointment.
We appreciate your time and look forward to seeing you on July 25.
If you have any questions about this invitation, please e-mail Starla Barker or Erik Anderson with De Novo Planning Group at [email protected] and [email protected].
Sincerely,
Joe Ames
Joe Ames, P.E., T.E.
Public Works Director / City Engineer
City of Laguna Hills
24035 El Toro Road, Laguna Hills, CA 92653
Phone (949) 707-2655 | Fax (949) 707-2633
[email protected]
City of Laguna Hills
Local Hazard Mitigation Plan
Service Providers/Organizations
July 25, 2024
Agenda
City of Laguna Hills LHMP 2
Introductions
Meeting Purpose
Overview of the Laguna Hills LHMP
Discussion
Introductions
City of Laguna Hills LHMP 3
We want to know YOUR experience with
and thoughts about hazards in Laguna Hills
Impacts of hazards on vulnerable
populations
City of Laguna Hills LHMP 4
Purpose of
Our Meeting
Today
What is a
LHMP?
Local • Specific to the City of Laguna Hills
• Identifies hazards, likelihood of Hazard occurring, and community’s risk • Finds ways to lessen the risks and Mitigation make these hazards less harmful • Long-term policies and actions to Plan increase resilience and reduce risk City of Laguna Hills LHMP 5
Why is the
City Preparing
a Hazard
Mitigation Plan?
To reduce losses from natural/human-induced hazards
To make our community more “disaster resistant”
Speed disaster recovery and redevelopment
Support other City programs/initiatives
Reduce burden on local governments and tax payers
Maintain eligibility for federal funds for pre-disaster mitigation planning
City of Laguna Hills LHMP 6
A Hazard Mitigation Plan demonstrates the jurisdiction’s commitment to reducing risks from natural hazards and serves as a guide for decision-makers as they commit resources to minimize the effects of natural hazards.
Hazards
Identified for
Evaluation
City of Laguna Hills LHMP 7
Discussion
City of Laguna Hills LHMP 8
Discussion
Questions
Who do you think would be most impacted or burdened in
the event of a natural hazard in Laguna Hills?
What are the most likely types of hazards that could affect vulnerable populations?
What is your biggest concern for vulnerable populations associated with any of these hazards or in an emergency? What actions could be put in place to help reduce the
concern and improve outcomes?
What else should we know?
City of Laguna Hills LHMP 9
Next Steps
Cal OES Review of Draft LHMP
Revise based on comments
FEMA Review of Draft LHMP
Receive approvable pending adoption
City Council consideration of LHMP for adoption
Receive final approval from FEMA
City of Laguna Hills LHMP 10
Thank You!
Input from today’s meeting helps us create the Draft
Plan
We revise the Draft Plan based on your feedback and
share it with:
California Governor’s Office of Emergency Services
Federal Emergency Management Agency
Laguna Hills City Council
City of Laguna Hills LHMP 11
From: Joe Ames
To: Joe Ames
Cc: Samantha Vu; [email protected]; Public Works Subject: HOA Meeting Invitation from the City of Laguna Hills Date: Tuesday, July 2, 2024 8:00:45 AM
July 2, 2024
Sent Via BCC E-mail
Dear HOA Manager:
The City of Laguna Hills is preparing a Local Hazard Mitigation Plan (LHMP) with the assistance of De Novo Planning Group.
A LHMP is a Federal Emergency Management Agency (FEMA)-approved plan that identifies natural hazards with the potential to impact a community, discusses the risks to the community associated with the natural hazards, and identifies mitigation actions to reduce the risks. A FEMA-approved plan provides opportunities for the City to seek grant funding for hazard mitigation activities.
We are seeking involvement from the community to help inform the plan.
The City is hosting a meeting with the Homeowner’s Associations within Laguna Hills to provide an overview of the plan and obtain input from your community specific to your experience with known natural hazards, vulnerabilities and risks, and potential mitigation actions that the City should attempt to implement in the future.
We have sent this e-mail to all known HOA property managers in the City as a blind carbon copy email. Therefore, as the HOA property manager, we kindly ask that you assist us with arranging for one or two members of your board/organization (HOA Managers welcome also!) to attend the LHMP meeting:
Date: Monday, July 29, 2024
Time: 6:00 - 7:00 pm
Location: Laguna Hills City Hall, Council Chambers, 24035 El Toro Road, Laguna Hills, CA 92653 Please confirm receipt of this e-mail and your HOA’s attendance by responding to this email.
We appreciate your time and look forward to seeing you on July 29, 2024.
If you have any questions about this invitation, please e-mail Project Manager Starla Barker with De Novo Planning Group at [email protected].
Sincerely,
Joe Ames
Joe Ames, P.E., T.E.
Public Works Director / City Engineer
City of Laguna Hills
24035 El Toro Road, Laguna Hills, CA 92653
Phone (949) 707-2655 | Fax (949) 707-2633
[email protected]
City of Laguna Hills
Local Hazard Mitigation Plan
Homeowners Associations/Property Management
July 29, 2024
Agenda
City of Laguna Hills LHMP 2
Introductions
Meeting Purpose
Overview of the Laguna Hills LHMP
Discussion
Introductions
City of Laguna Hills LHMP 3
We want to know YOUR experience with
and thoughts about hazards in Laguna Hills
Impacts of hazards on the community,
including vulnerable populations
City of Laguna Hills LHMP 4
Purpose of
Our Meeting
Today
What is a
LHMP?
Local • Specific to the City of Laguna Hills
• Identifies hazards, likelihood of Hazard occurring, and community’s risk • Finds ways to lessen the risks and Mitigation make these hazards less harmful • Long-term policies and actions to Plan increase resilience and reduce risk City of Laguna Hills LHMP 5
Why is the
City Preparing
a Hazard
Mitigation Plan?
To reduce losses from natural/human-induced hazards
To make our community more “disaster resistant”
Speed disaster recovery and redevelopment
Support other City programs/initiatives
Reduce burden on local governments and tax payers
Maintain eligibility for federal funds for pre-disaster mitigation planning
City of Laguna Hills LHMP 6
A Hazard Mitigation Plan demonstrates the jurisdiction’s commitment to reducing risks from natural hazards and serves as a guide for decision-makers as they commit resources to minimize the effects of natural hazards.
Hazards
Identified for
Evaluation
City of Laguna Hills LHMP 7
Discussion
City of Laguna Hills LHMP 8
Discussion
Questions
What are the most likely types of hazards that could affect the community?
What is your biggest concern in the event of a natural
hazard?
What is your biggest concern for vulnerable populations associated with any of these hazards or in an emergency? What actions could be put in place to help reduce these concerns and improve outcomes?
What else should we know?
City of Laguna Hills LHMP 9
Next Steps
Cal OES Review of Draft LHMP
Revise based on comments
FEMA Review of Draft LHMP
Receive approvable pending adoption
City Council consideration of LHMP for adoption
Receive final approval from FEMA
City of Laguna Hills LHMP 10
Thank You!
Input from today’s meeting helps us create the Draft
Plan
We revise the Draft Plan based on your feedback and
share it with:
California Governor’s Office of Emergency Services
Federal Emergency Management Agency
Laguna Hills City Council
City of Laguna Hills LHMP 11
City of Laguna Hills
Local Hazard Mitigation Plan
Focus Group Meetings
August 16, 2024
Agenda
City of Laguna Hills LHMP 2
Introductions
Meeting Purpose
How Does Laguna Hills Prepare for Hazards?
Discussion
Introductions
City of Laguna Hills LHMP 3
Purpose of
Our Meeting
Today
We want to know YOUR
experience with and thoughts
about hazards in Laguna Hills
City of Laguna Hills LHMP 4
What is a
LHMP?
Local • Specific to the City of Laguna Hills
• Identifies hazards, likelihood of Hazard occurring, and community’s risk • Finds ways to lessen the risks and Mitigation make these hazards less harmful • Long-term policies and actions to Plan increase resilience and reduce risk City of Laguna Hills LHMP 5
Why is the
City Preparing
a Hazard
Mitigation Plan?
To make our
community
more
“disaster
resistant”
Coordinate
emergency
resources in
the
community
Maintain
eligibility for
federal funds
City of Laguna Hills LHMP 6
Hazards
Identified for
Evaluation
City of Laguna Hills LHMP 7
Discussion
City of Laguna Hills LHMP 8
Discussion
Questions
Do you have any personal experiences with these
hazards in Laguna Hills?
What are the most likely types of hazards that you feel could affect you and do you feel prepared for them?
What is your biggest concern about any of these hazards or in an emergency?
Do you know where to go and what to do in an
emergency?
Do you know where to find information about hazards
and emergencies in Laguna Hills?
City of Laguna Hills LHMP 9
Next Steps
Cal OES Review of Draft LHMP
Revise based on comments
FEMA Review of Draft LHMP
Receive approvable pending adoption
City Council consideration of LHMP for adoption
Receive final approval from FEMA
City of Laguna Hills LHMP 10
Thank You!
Input from today’s meeting helps us create the Draft
Plan
We revise the Draft Plan based on your feedback and
share it with:
California Governor’s Office of Emergency Services
Federal Emergency Management Agency
Laguna Hills City Council
City of Laguna Hills LHMP 11
Emergency
Notifications
To sign up for Laguna Hills Citywide emergency alerts and other notifications:
Text 92653 to 888-777
City of Laguna Hills | Local Hazard Mitigation Plan Team 12
1 COMMUNITY SURVEY SUMMARY
INTRODUCTION
On online survey was available from January 4, 2022 through March 31, 2022. The survey was 13 questions long and had 38 total respondents. Pages 1 and 2 include a high-level summary of the responses, and the full text of the survey and responses is provided on the following pages. The survey was promoted through the City’s social media channels, including Facebook, as seen in the photo below.
OVERVIEW
▪ Most respondents live in Laguna Hills, some work in Laguna Hills, and a few are visitors. ▪ The largest percentage of respondents are in the 35-44 age group.
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 2 ▪ The most common hazards respondents reporting experiencing in Laguna Hills are:
o High winds
o Earthquake
o Heavy rain
o Power outage
o Extreme heat
▪ The hazards respondents reported feeling the most concerned about include:
o Drought o Extreme heat o Earthquake
o Wildfire o Power outage o High winds
▪ Hazards that respondents believe have a high likelihood of occurring or impacting Laguna Hills include:
o High winds o Extreme heat o Earthquake
o Drought o Power outage o Wildfire
▪ Hazards that respondents ranked as having the highest likelihood of potential threat to Laguna Hills:
o Earthquake o Extreme heat o High winds
o Wildfire o Drought o Power outage
▪ Additional hazards that respondents think is a wide scale threat to Laguna Hills:
o Viruses, alien attack o Pedestrian safety o Pandemic
o Pollution o Cyber threats
▪ Most households said they are somewhat prepared to deal with a hazard event and have taken actions to make their home, business, or neighborhood more resistant to hazards.
▪ Email is the preferred method for respondents to receive information about hazards, followed by City/agency newsletters and social media.
▪ The majority of respondents said the best thing the City, County or other agencies can do to help them become better prepared is to provide effective emergency notifications and communications in a disaster.
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 3 FULL TEXT OF SURVEY AND RESPONSES
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 4
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 5
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 6
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 7
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 8
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 9
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 10
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 11
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 12
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 13
City of Laguna Hills │ Local Hazard Mitigation Plan │ Community Survey Summary 14 (Question 13 also asked for emails, which are not included here.)
2 OCPW FACEBOOK (posted 2/4/2022)
3 OCPW INSTAGRAM (posted 2/4/2022)
4 OCPW TWITTER (posted 2/7/2022)
5 Shannon Widor
Strategic Communications Officer
OC Public Works
601 North Ross Street, Santa Ana, CA 92701
714-667-9759 office
714-438-9707 cell
[email protected]
www.OCPublicWorks.com
Item No. 4.8
City of Laguna Hills
City Council / Planning Agency
Staff Report
Date: February 25, 2025
To: Mayor and Council Members
From: Joe Ames, Public Works Director/City Engineer
Issue: Proposed T-Ball Infield Installation at Costeau Park Recommendation: That the City Council direct the Public Works Director to install an infield at the existing backstop area at Costeau Park for “T-Ball” play.
Background:
City staff received a request to establish a T-ball field at Costeau Park.
Baseball facilities within the City of Laguna Hills are predominately used by Laguna Hills Little League (LHLL). LHLL is in favor of creating a more formal T-ball field at Costeau Park because they currently use this field for practice and are interested in hosting Tball games at this park on Saturdays during the baseball season. Further, LHLL reported there is an uptick in enrollment for players starting little league at the T-ball level.
Currently, LHLL uses the following City of Laguna Hills fields:
1. Community Center Sports Complex Little League Field
2. Community Center Sports Complex Softball Field
3. Upper Cabot Park Field
4. Lower Cabot Park Field
5. Stockport Park
6. Costeau Park
Therefore, it is proposed to install an infield at the existing backstop area at Costeau Park for T-ball play. This project would involve removing a small section of grass and adding infield dirt in front of the existing chain-link backstop area (see Images 1 – 4 in
Item No. 4.8
the attachments). An aerial photo image of Costeau Park is provided as Image 5 in the attachments for reference.
The estimated cost for this proposed project is less than $30,000 and would also include the following work:
• Sod removal and adding infill mix,
• Laser grading on infield dirt,
• Installation of bases at 50’ and 60’ placements (to accommodate different levels of play), and
• Removal of solids and disposal.
No pitcher's mound is contemplated because Little League batters use a tee.
Images of the infield at the Laguna Hills Community Center and Sports Complex Little League Field are provided in the attachments (see Images 6 – 8) to depict the infield work to be done at Costeau Park.
City staff presented this item for discussion on the Parks and Recreation Commission's February 5, 2025, meeting agenda.
Prior to the February 5, 2025, meeting, City staff sent mailed notices regarding the proposed project to residents within 300 feet of Costeau Park, including all the residents that front the Park. The notice encouraged residents to attend the meeting and/or provide electronic comments. City staff received no comments in writing or at the meeting.
Based on the information above and the absence of public comments opposing the installation, the Parks and Recreation Commission recommended that “City Council move forward with this project with specifications to be determined based on cost as a way to support LHLL growth and their program.”
Subsequent to the Parks and Recreation Commission meeting, on February 14, City staff met with LHLL to further clarify their needs. They requested to retain a grass infield but with dirt base paths; however, this is not a requirement, and they would be appreciative of the extra infield at Costeau Park.
Consequently, City staff recommends that the City Council direct the Public Works Director to install an infield at the existing backstop area at Costeau Park for “T-Ball” play.
Item No. 4.8
CEQA Findings:
Environmental review is not required under the California Environmental Quality Act (CEQA) pursuant to the California Code of Regulations, Title 14, Chapter 3, Section 15301 as a Class 1 Categorical Exemption – “Existing Facilities.” Fiscal Impact:
The estimated construction cost is less than $30,000. No budget adjustment is necessary since there is sufficient funding in account 100-355-720700 (Landscape Maintenance) to cover the cost of this work.
Attachments:
1. Costeau Park Backstop Area Images 1-8
Costeau Park
Backstop Area
Image 1
Image 2
Image 3 Image 4
Aerial of
Costeau Park
Image 5
Laguna Hills Community Center Sports Complex
Little League Field
Image 6 Image 7
Image 8
Item No. 4.9
City of Laguna Hills
City Council / Planning Agency
Staff Report
Date: February 25, 2025
To: Mayor and Council Members
From: Joe Ames, Public Works Director/City Engineer
Issue: Laguna Hills Civic Center Termite Fumigation
Recommendation: That the City Council: 1) Find and determine it is appropriate to waive formal bidding requirements of the Laguna Hills Municipal Code (LHMC) for the award of termite fumigation services due to the following reasons: a) No bids or proposals were received through the formal bid process (LHMC Section 3-08.090(G)); b) A reasonable attempt has been made to obtain informal bids or proposals; and c) It has been determined by the Purchasing Officer that three bids or proposals cannot be obtained (LHMC Section 3-08.110(C)); 2) Approve and award the Work Order Agreement with Western Exterminator Company; and 3) Authorize the City Manager to execute the Work Order Agreement.
Background:
In 2002, the City of Laguna Hills acquired what is now the Laguna Hills Civic Center at 24031-24035 El Toro Road. In late 2004, renovation work to the building was completed.
To City staff’s knowledge, since 2004, the Civic Center has never been treated for termites. Essex Property Management, the property management company for the Laguna Hills Civic Center, and termite fumigation companies recommended that the Laguna Hills Civic Center be tented and treated for termites with sulfuryl fluoride gas.
City staff prepared formal bid documents and specifications for termite fumigation services with the aim of having the work done during the City Hall winter closure of December 25, 2024 – January 1, 2025. On October 9, 2024, the City released the Notice Inviting Bids and Specifications for termite fumigation services. Bids were to be opened
Item No. 4.9
November 4, 2024; however, no bids were received despite multiple vendors touring City Hall to review the building prior to the bid opening date. City staff believes the lack of bids is due to termite fumigation companies requiring their customers to enter into their specific agreements rather than the City’s template maintenance services agreement.
Laguna Hills Municipal Code Section 3-08.090(G) provides that “if no bids or proposals are received, the purchase may be let in the open market or by the informal procedures set forth in Section 3-08.080, subject to City Council approval.” Further, Laguna Hills Municipal Code Section 3-08.090(G) provides that “when after a reasonable attempt has been made to obtain informal bids or proposals, and it has been determined by the Purchasing Officer that three bids or proposals cannot be obtained” the procurement policies in Sections 3.08-080 and 3.08-090 may be dispensed with.
On behalf of the City, Essex Property Management was able to subsequently procure two bids from reputable termite fumigation companies. Western Exterminator Company was the lowest bid with a bid of $109,987.
If the work is approved by City Council, City staff plan to require the contractor to conduct this work during the period of August 4 – 8, which is during the City Council summer recess, and plans to set up the Heritage Room at the Community Center as a remote work area. In addition, City staff plans to set up a temporary “public counter” to receive citizen inquiries just as the City currently does at the Civic Center. Essex Property Management has already advised the building tenants of the possible work and will notify building tenants of the final work dates so they can make other arrangements.
While City staff had planned to try to conduct the termite fumigation work during this past winter closure, none of the termite fumigation companies would guarantee that roof tiles would not be broken during the tenting placement and removal operations.
Therefore, City staff believe it is in the best interest of the City to conduct this work during the non-rainy season.
Consequently, City staff recommends that the City Council award the Work Order Agreement to Western Exterminator Company and authorize the City Manager to sign the Work Order Agreement.
CEQA Findings:
Environmental review is not required under the California Environmental Quality Act
Item No. 4.9
(CEQA) pursuant to the California Code of Regulations, Title 14, Chapter 3, Section 15301 as a Class 1 Categorical Exemption – “Existing Facilities.” Fiscal Impact:
The work is estimated to cost $109,987. In addition, the leases with the Civic Center tenants provides that tenants shall have unfettered access to their suites, except for emergency repairs. Because this is not emergency work, rent abatement for the period of one week will need to be provided at an estimated cost of $15,000. CIP 505 has an available budget of $462,415; therefore, sufficient funding in account 600-255-950505 (Civic Center Improvements) exists to cover the cost of this work. The Civic Center Enterprise fund has sufficient funding to cover the loss of rent revenue.
Attachments:
1. Proposed Work Order Agreement
1. 1/3 down payment with full upon completion. Down payment $ _________ Due on completion $ _________.
Any balance remaining 30 days after completion of work shall be charged at 1 1/2% per month or 18% per annum.
Any balance remaining 90 days after completion of work shall be charged interest of 1 1/2% per month or 18% per annum.
PAYMENT OPTIONS: TOTAL
* PRICES ARE BASED ON WESTERN EXTERMINATOR COMPANY PERFORMING ALL OF THE RECOMMENDED SERVICE.
IF ALL OF THE WORK IS NOT AUTHORIZED, PRICES ARE SUBJECT TO REVIEW.
ITEMIZATION OF COST FOR WORK RECOMMENDED ON TERMITE REPORT # 69244250 PROPERTY ADDRESS: 24035 EL TORO RD LAGUNA HILLS 92653
OWNER / AGENT:
CITY: STATE: ZIP: CA
CHRIS JOHAR PROPERTY MGR, ESSEX REALTY MANAGEMENT INC, 27001 LA PAZ RD STE … (714) 543-9241
Escrow Company Escrow # Close Date:
Address State Zip Phone
Does any person living or working at this address have any known chemical sensitivities or allergies? Have you or anyone else living or working at this address ever made any pesticide applications to the interior or exterior of the structure? YES
YES
NO
NO
Initial Initial / / -
( )
(714) 662-4877
# Monthly invoices after work completed
2. For properties in escrow: Payment in full upon close of escrow. If escrow does not satisfy this argreement, Seller shall be liable for any unpaid monies.
3. Financing down payment $ ___________ plus ________ monthly payments of $ ____________ I hereby authorize Western Exteminator Company to perform the following items:
AUTHORIZATION
* Prices are good for 30 days from date of inspection.
* Your rights per "Federal Truth in Lending Law", a "Notice to Owner" and the policy re: "Arbitration of Disputes" are on page two of this agreement.
By signing below, you state that you have read and agree to the Terms & Conditions on the front and back of this Work Order Agreement.
By Owner/Agent/Buyer
Date
Res. Phone Work
Signature
By
Date
(Print Name)
(Signature)
Lic.#
NOTE: WORK WILL NOT COMMENCE UNTIL DELIVERY OF YOUR
"WOOD DESTROYING PEST AND ORGANISMS INSPECTION REPORT"
For details regarding the above recommendations please refer to your Inspection Report.
RECEIPT OF PESTICIDE NOTIFICATION
Customer
Initials Customer unavailableleft at location Western Exterminator Company (Print Name)
( ) ( )
/ / - - CONDITIONS
JASON BENNETT
01/02/2025 FR36070
PLEASE NOTE THAT THIS CONTRACT CONTAINS AN ARBITRATION PROVISION WHICH On Report # 69244250 IS LOCATED ON THE BACK SIDE OF THIS WORK ORDER AGREEMENT.
PAGE 1 OF 3
For details regarding the charges for each Recommendation, please refer to page 3 of this Work Order Agreement.
TOTAL OF WORK TO BE DONE: 109987.00
* Monthly auto payment via credit/debit card (Customer initial for authorization) _____________ # Western will invoice client monthly for agreed upon portion of outstanding balance. Payment is due within 10 days of receipt. * Western will process this transaction for the agreed upon monthly payment on the 15th of the month or the next business day. #* If invoices or transactions become past due more than 60 days, the full remaining balance becomes due and the monthly payment portion of the agreement becomes rescinded. The remaining balance including finance charge will become due in full. www.WesternExterminator.com
(See page 3 for detailed list)
Form dated: 06-21-2015
Item No. 4.10
City of Laguna Hills
City Council / Planning Agency
Staff Report
Date: February 25, 2025
To: Mayor and Council Members
From: Jennifer Lowe, Community Development Director
Issue: Development Application Status Report
Recommendation: That the City Council receive and file the report.
Background:
The purpose of this Status Report is to identify new and pending development applications in process with the City’s Community Development Department which will require a public hearing. Links to project documents are available on the City’s website at: https://lagunahillsca.gov/PlanningProjects.
Case Number USE-0211-2025 (SDP/VTTM)
Project Location 23161 Mill Creek
Project
Description
Request to redevelop a 2.34-acre commercial office property with 36 residential units.
Applicant Aylene Chu, on behalf of Toll West Coast, LLC (Toll Brothers) for Khoshbin Hillside, LLC (Property Owner)
Project Planner David Blumenthal, Contract Planner
Status This project was initially submitted as a preliminary application under SB 330 on December 18, 2024. The formal development application was submitted on January 30, 2025, and is currently under review by staff.
Item No. 4.10
Case Number USE-0209-2025 (SDP/VTTM)
Project Location 23272, 23282, 23422, 23382, 23332 Mill Creek Drive; 24461, 24411 Ridge Route Drive
Project
Description
Request to construct 464 residential units.
Applicant John Stack, on behalf of Ridge Route LLC, KB Mill Creek DST, KB Spectrum Summit Plaza, LLC
Project Planner David See, Contract Planner
Status This project was initially submitted as a preliminary application under SB 330 on October 29, 2024. The formal development application was submitted on January 23, 2025, and is currently under review by staff.
Case Number USE-0166-2023 (SDP/TPM/PUP/PP)
Project Location 24422 Avenida de la Carlota, Oakbrook Plaza Project
Description
A request to construct a new 240-unit senior living apartment complex in a 7-story, podium-style development with four residential levels located above four parking levels, including one subterranean parking level. The existing office building on site will remain, with parking for the office building provided in the new parking structure.
Applicant Matt Haugen, BSP Oakbrook LLC
Project Planner Adam Pisarkiewicz, Contract Planner
Status On April 11, 2024, a letter was sent to the Applicant deeming the Application complete. On June 10, 2024, a letter was sent to the Applicant identifying reasons the proposed Project is, or potentially is, inconsistent, not in compliance, or not in conformity with City plans, programs, policies, ordinances, standards, and requirements. On July 30, 2024, a letter was sent to the Applicant identifying additional technical review comments. Staff is currently awaiting resubmittal of plans; the item will be scheduled for public hearing when ready.
Item No. 4.10
Case Number USE-0147-2023 (SDP)
Project Location 25254 La Paz Road
Project
Description
Request to construct 180 age-restricted, multiple-family dwelling units within an approximately 61-foot-tall, six-story building, including two parking levels (one subterranean) with 250 parking spaces.
Applicant Nick Buchanan
Project Planner Jay Wuu, Senior Planner
Status On April 18, 2024, a letter was sent to the Applicant deeming the Application complete. On June 17, 2024, a letter was sent to the Applicant identifying reasons the proposed Project is, or potentially is, inconsistent, not in compliance, or not in conformity with City plans, programs, policies, ordinances, standards, and requirements. Staff is currently conducting CEQA review and additional technical review of the proposed Project. The item will be scheduled for public hearing when ready.
Case Number USE-0165-2023 (ZTA/TTM/SDP)
Project Location 23272 – 23282 Mill Creek Drive
Project
Description
Request to construct 48 detached residential condominium units.
Applicant John Stack, on behalf of KB Spectrum Summit Plaza, LLC Project Planner Jay Wuu, Senior Planner
Status On May 3, 2024, a letter was sent to the Applicant deeming the Application complete. On August 28, 2024, a letter was sent to the Applicant identifying additional technical review comments and informing the Applicant of significant design concerns. Staff is currently awaiting a withdrawal of the Application or resubmittal of plans; the item will be scheduled for public hearing when ready.
Item No. 4.10
Case Number USE-0195-2024 (SDPM)
Project Location 24795 Alicia Parkway
Project
Description
Converting an existing full service carwash to an express carwash Applicant A&S Engineering, on behalf of Southland Property Investments, LLC
Project Planner Jennifer Ash, Assistant Planner
Status Application intake was on November 12, 2024, and is currently under review.
Case Number USE-0172-2024 (CPMA)
Project Location 23521 Paseo de Valencia
Project
Description
Request to construct carports in the Taj Mahal parking lot to accommodate solar panels.
Applicant Alisha Cosio, on behalf of Valta Energy
Project Planner Jennifer Ash, Assistant Planner
Status On March 29, 2024, a letter was sent to the Applicant deeming the Application incomplete. Staff is currently awaiting resubmittal of plans; the item will be scheduled for public hearing when ready.
Fiscal Impact:
None.
Attachments:
None
Item No. 9.1
City of Laguna Hills
City Council / Planning Agency
Staff Report
Date: February 25, 2025
To: Mayor and Council Members
From: Jennifer Lee, City Clerk
Issue: Committee Assignment Reports
Recommendation: That the City Council receive reports from City Council Members on the City Council Committee Assignments listed in the staff report.
Background:
The following are recent meetings and events attended by the City Council for their City Council Committee Assignments.
Events, Communication, and Beautification Committee
Council Member Pezold
Council Member Mathis
February 12, Regular Meeting
Transportation Corridor Agencies (TCA)
San Joaquin Hills TCA Board of Directors
Council Member Pezold
February 13, Joint Board Meeting
Orange County Older Adults Advisory Commission (OCOAAC) Mayor Wheeler
February 14, Regular Meeting
Item No. 9.1
Orange County Mosquito and Vector Control District (OCMVCD) Board of Trustees
Council Member Pezold
February 20, Regular Meeting
Fiscal Impact:
The City does not provide any additional compensation to City Council Members for serving on outside agency boards or committees.
Attachments:
None