CITY OF LAGUNA NIGUEL
CITY COUNcIL AGENDA ITEM
To: Honorable Mayor and Council Members
FROM: Jacki Scott, Public Works Director/City Engineer
DATE: March 1, 2022
SUBJECT: Approval of Amendment No. 3 to the Professional Services Agreement for On-Call Professional Engineering Services with Psomas for the La Paz Road Earth Movement Evaluation - Phase 2

RECOMMENDATION
Staff recommends that the City Council:

1. Approve Amendment No. 3 to the Professional Services Agreement for On-Call Professional Engineering Services with Psomas to provide geotechnical and engineering services for the La Paz Road Earth Movement Evaluation - Phase 2 for a total not-to-exceed amount of $287,090 and waive the RFP Process for this Amendment due to this emergency situation;

2. Approve a not-to-exceed 20% contingency of the total contract in the amount of $57,418 for unforeseen conditions or extra work and authorize the Public Works Director/City Engineer to approve additional work for a total not-to-exceed amount of $344,508, if needed; and,

3. Authorize the City Manager to execute Amendment No. 3 and future amendments to the Professional Services Agreement for On-Call Professional Engineering Services with Psomas, subject to the City Attorney making non-substantive changes.

BACKGROUND
La Paz Road was constructed in the late 1960's with one lane in each direction, then subsequently widened to two lanes in each direction in the 1990's. Throughout the years, earth movement was noticed with distortions of the pavement, , sidewalk, and parkway areas along the Niguel Regional Park interface near Rancho Niguel Road. Nearly seventy 24-inch diameter caissons were installed within the travel lanes of La Paz Road in the 1990's and early 2000's, along with a crib wall at the Orange County Regional Park in order to address the earth movement and minimize future cracking and roadway distortion.

Page 2 ends

Since the early 2000's, the City repaired cracks and minor distortion in the roadway as it occurred, but recently, the distortions have become more severe requiring the southbound number two lane to be closed to vehicular, bicycle, and pedestrian traffic.

While the travel lane has been closed, Public Works inspection and engineering staff has closely monitored the worsening cracks and pavement condition with the assistance of Psomas and Ninyo and Moore, a geotechnical engineering firm, through the City's On- Call Professional Services Agreement. In order to complete an assessment of the likely cause of the earth movement and recommend possible short-term and long-term solutions, Psomas and Ninyo and Moore will be required to install monitoring equipment and complete an assessment of the earth movement.

A map showing the vicinity and location of the earth movement along La Paz Road is provided as Attachment "A". Investigation and resolution of the roadway distress supports City Council Goal 1 (Public Safety) and Goal 4 (Infrastructure and Technology) of the City's adopted Strategic Plan.

ANALYSIS
Due to the unforeseen increase in earth movement along La Paz Road, the City Manager determined, pursuant to Subsection (3) of Section 3-6-7 of the Laguna Niguel Municipal Code, that emergency procurement of geotechnical services to assess the situation was needed. Any delay in assessment could result in material loss or damage to the roadway if immediate action was not taken. Therefore, the circumstances justified an exemption to the use of the competitive bidding process requiring the issuance of a written request for proposals and subsequent evaluation of bids.

The Public Works Department identified Psomas, one of the firms on the Public Works On-Call Professional Engineering Services List, as the most qualified consultant to provide the geotechnical and engineering services for the La Paz Road Earth Movement Evaluation given the City's knowledge of Psomas' capabilities, experience, and past performance.

On December 1, 2021, the Public Works Department requested a proposal from Psomas for geotechnical and engineering services related to the La Paz Road Earth Movement Evaluation. Psomas submitted its proposal, and cost negotiations with the consultant yielded a proposal that delivers the emergency services at a fair and reasonable cost to the City. In accordance with Subsection 3 of section 3-6-7 of the Laguna Niguel Municipal Code and under the City Manager's authority for the immediate purchase of services for emergency conditions pursuant to Section 7 (b) of the City's Purchasing Policy, the City authorized Psomas in January 2022 to conduct a Phase 1 study of the earth movement along La Paz Road.

The Phase 1 Study includes data collection and data mapping, creation of a base map, preparation of an encroachment permit to Orange County Parks, and the initial geotechnical investigation services of Ninyo and Moore, a subcontractor of Psomas.

Page 3 ends

In order for Psomas to continue its geotechnical assessment and provide a comprehensive reporting of the most likely causes of the earth movement, the City is requesting City Council approval of Phase 2 of the La Paz Road Earth Movement Evaluation. The support services will continue to be billed on a time and materials basis at the hourly rates provided in the proposal. Staff is requesting that, in approving this Phase 2 work through Psomas, that the City Council exercise its authority to waive the RFP process, pursuant to the Council's authority under Subsection (8) of Section 3-6-7 of the Laguna Niguel Municipal Code, due to the emergency condition that exists.

As deliverables for Phase 2 of the La Paz Road Earth Movement Evaluation, Psomas will provide substructure utility locating services; conduct preliminary coordination with utility companies; geotechnical engineering investigation and analysis; traffic control plans and conceptual street improvement plans and cost estimates; prepare a comprehensive pre- design report documenting its findings and recommendations; and provide project management services and quality control services. Throughout the evaluation of Phase 2, mitigation measures to reopen the closed lane along La Paz Road will be examined and a schedule for reopening the lane will be developed.

Staff recommends approving Amendment No. 3 to the Agreement with Psomas to provide geotechnical and engineering services for the La Paz Road Earth Movement Evaluation - Phase 2 for a total not-to-exceed amount of $287,090 (Attachment "B").

Additionally, due to the nature of the earth movement issues, it is anticipated that unknown conditions may present themselves during further assessment of the geotechnical solutions and conceptual street improvement plans. To address these concerns in a timely fashion, it is recommended that a 20% contingency be established on this project to complete the investigation, analysis, and recommendations. Typically, a 10% contingency is the standard recommendation; however, this project poses a higher risk of added costs and a 20% contingency will facilitate a comprehensive assessment of the earth movement issues. Any additional cost above the 20% contingency will return to the City Council for approval. Therefore, staff also recommends approving a not-to- exceed 20% contingency of the total contract in the amount of $57,418 for a total not-to- exceed amount of $344,508.

ALTERNATIVES CONSIDERED

1. The City Council may decide not to approve Amendment No. 3 to the Professional Services Agreement with Psomas and direct staff to issue an RFP. Staff believes that issuing an RFP will not result in more desirable proposals and would cause delays in addressing the La Paz Road earth movement issues and prolong the lane closure.

2. The City Council may decide not to approve Amendment No. 3 to the Professional Services Agreement with Psomas. This alternative is not recommended as it will result in delays in addressing the La Paz Road earth movement issues and initiating discussions with the County of Orange.

Page 4 ends

FISCAL REVIEW
Funding for Amendment No. 3 will be split across two fiscal years. In Fiscal Year 2021- 22, $150,000 will be allocated from the Public Works Department operating budget. Fiscal Year 2022-23 funds will be budgeted in the CIP.

LEGAL REVIEW
The City Attorney's Office has reviewed Amendment No. 3 and this staff report and has approved both documents as to form.

CONCLUSION
Staff recommends that the City Council:

1. Approve Amendment No. 3 to the Professional Services Agreement for On-Call Professional Engineering Services with Psomas to provide geotechnical and engineering services for the La Paz Road Earth Movement Evaluation - Phase 2 for a total not-to-exceed amount of $287,090 and waive the RFP Process for this Amendment due to this emergency situation;

2. Approve a not-to-exceed 20% contingency of the total contract in the amount of $57,418 for unforeseen conditions or extra work and authorize the Public Works Director/City Engineer to approve additional work for a total not-to-exceed amount of $344,508, if needed; and,

3. Authorize the City Manager to execute Amendment No. 3 and future amendments to the Professional Services Agreement for On-Call Professional Engineering Services with Psomas, subject to the City Attorney making non-substantive changes.

Page 5 ends

Jamara 8 Retousseau Never I. Emis
Tamara S. Letourneau Kevin G. Ennis
City Manager City Attorney
Public Works Director/City Engineer
Attachments:

A. Vicinity and Location Map
B. Amendment No. 3 to the Professional Services Agreement with Psomas

ATTACHMENT A
Vicinity and Location Map
LEGEND
Aliso Creek Rd
Project boundary
Vicinity Map
La Paz Rd
Rancho Niguel Rd
Vicinity and Location Map
La Paz Road Earth Movement Evaluation

ATTACHMENT B
Amendment No. 3 to the
Professional Services Agreement with Psomas
AMENDMENT NO. 3 TO AGREEMENT FOR PROFESSIONAL SERVICES
(PUBLIC WORKS DEPARTMENT)

ON-CALL PROFESSIONAL ENGINEERING SERVICES
THIS AMENDMENT NO. 3 TO THE PROFESSIONAL SERVICES AGREEMENT (this "Amendment No. 3") is made and entered into as of between the City of Laguna Niguel, a municipal corporation, hereinafter the "City", and PSOMAS, a California corporation, hereinafter the "Consultant".

RECIIALS:

A. The City contracted with the Consultant to provide on-call professional services to support the Public Works Department in the following categories: 1) Engineering, Architecture, and Landscape Architecture Design, 2) Private Development Plan Check, 3) Project and Program Management, 4) Environmental Programs Assistance, and 5) Construction Management.

The City entered into a Professional Services Agreement for the City of Laguna Niguel Public Works Department with the Consultant on March 16, 2021, (the "Agreement") to provide professional services as requested by the City's Public Works Department. The term of the Agreement commenced on March 16, 2021 and is to continue in effect until June 30, 2022.

C. The City has requested the following additional services from the Consultant:

Geotechnical and engineering services for the La Paz Road earth movement evaluation - Phase 2 ("Additional Services"), as described in Exhibit "A-3," attached hereto and incorporated herein by this reference.

D. The Consultant submitted a proposal for the above requested Additional Services, which is included in Exhibit "A-3."
Consultant has the qualifications and experience to render the requested Additional Services.

City now desires to enter into this Amendment No. 3 to the Agreement with the Consultant for the requested Additional Services.

AGREEMENI
NOW, THEREFORE, in consideration of the foregoing recitals and the mutual promises and covenants herein contained, the parties hereto agree as follows:

Services to be Performed by Consultant. Consultant agrees to perform the Additional Services for the City, in a manner satisfactory to the City, as detailed in Exhibit "A-3." Term. This Amendment No. 3 shall become effective as of the date stated above and will continue in effect until the Additional Services are completed, subject to termination as provided in the Agreement, except the indemnification provisions contained in the Agreement shall remain in full force and effect after Amendment No. 3 is terminated.

3. Payment for Services. City agrees to pay the Consultant for providing the Additional Services an amount not to exceed Two Hundred Eighty-Seven Thousand Ninety Dollars ($287,090.00). Consultant shall invoice the City monthly on a time and materials basis as set forth in Exhibit "A-3."
This Amendment No. 3 will also include a twenty percent (20%) contingency in an amount not-to-exceed Fifty-Seven Thousand Four Hundred Eighteen Dollars ($57,418.00) to account for unforeseen conditions or additional work related to this Project. This allowance shall be used solely by the City to address any unforeseen repairs or additional work related to the Project. The Contractor shall obtain written approval from the City for the use of the allowance, which approval shall not be unreasonably withheld.

In no event shall compensation to the Consultant exceed Three Hundred Forty-Four Thousand Five Hundred Eight Dollars ($344,508.00) for the Additional Services.

4. Continuation of Terms and Conditions of the Agreement. Except as otherwise expressly provided in this Amendment No. 3, all the terms and conditions of the Agreement, as amended by Amendment Nos. 1 and 2, shall remain in full force and effect and shall apply to the performance of services pursuant to this Amendment No. 3.

5. Authority to Sign. The person(s) executing this Amendment No. 3 on behalf of the Consultant warrants and represents that they have the authority to execute this Amendment No. 3 on behalf of the Consultant and have the authority to bind the Consultant to the performance of the obligations hereunder.
2 IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 3 to the Agreement as of the date first above written.
"CITY"

CITY OF LAGUNA NIGUEL
By:_
Tamara S. Letourneau
City Manager
ATTEST:

Thy M. Merritt,
Acting City Clerk

APPROVED AS TO FORM BY THE

CITY ATTORNEY FOR THE

CITY OF LAGUNA NIGUEL,

CALIFORNIA
Kevin G. Ennis, Esq.

City Attorney
"CONSULTANT"

PSOMAS,
By:_
Print Name:

Title:

By:

Print Name:

Title:
3 EXHIBIT "A-3"

ADDITIONAL SERVICES
PSOMAS
Balancing the Natural and Bullt Environment
January 26, 2022

VIA EMAIL
[email protected]
Ms. Jacki Scott
Public Works Director
City of Laguna Niguel
Subject: Proposal for Final Geotechnical Services for the La Paz Road Landslide Evaluation (Phase 2) Psomas, in association with Ninyo & Moore, greatly appreciates this opportunity to provide this proposal for Geotechnical and Engineering Services for the La Paz Road Landslide Evaluation in the City of Laguna Niguel (City), California. Our proposal is based on the City's request made on December 1, 2021 and subsequent field visit on December 2, 2021.

Attached please find Exhibit A, which includes our Project Understanding and Scope of Services and Exhibit B, which includes our Fee Proposal. The budgets are based on the Billing Rates for the City of Laguna Niguel for 2021 to 2022. Additionally, firm qualifications for Ninyo & Moore are included as This proposal is valid for 90 calendar days from the date of preparation. If you have any questions regarding this proposal, please feel free to call me. Again, we appreciate you providing Psomas the opportunity to submit this proposal to you for this project.

Sincerely,
PSOMAS
Carrie Davis, PE
Senior Project Manager
CC: Arief Naftali, Psomas
Ron Hallum, Nino & Moore
lIpprod.psomas.corp\panzuraprojects\OC_Projects\2LAG050402\ADMIN\Contracts\Proposal\La Paz Road Landslide Evaluation Scope of Work Phase 2.docx
PSOMAS
Ms. Jacki Scott

Page 1 ends

January 26, 2022
La Paz Road Landslide Evaluation

EXHIBIT A
Scope of Work
Task 1.0 Project Management and Coordination

1.1 Periodic Progress Meetings
Psomas will participate in period project meetings with the City, Ninyo & Moore, and others as appropriate to review the scope, schedule, coordination procedures, and intended outcomes for the project.

1.2 Project Schedule
The project delivery schedule approved during Phase 1 services will be updated monthly. Project activities are expected to commence and conclude within 2022.

1.3 Perform Quality Assurance and Quality Control Reviews Psomas will provide quality control and quality assurance for the project. This task includes review of subconsultant deliverables prior to submittal to the City, identifying conflicts between disciplines, and providing input on the overall quality and efficiency of the project. This task includes documentation of comments and responses to the quality control comments required for each submittal.

1.4 Project Management/Administration
Psomas will provide overall project management throughout the duration of this contract. This includes services such as:
• Providing the City with a single point of contact to discuss progress, communicate project decisions, and general contract management
• Coordinating with project stakeholders, design team, and subconsultants • Directing and monitoring project deliverables
• Preparing monthly invoicing
Task 1.0 Deliverables:
• Attendance at Project Meetings and Minutes (total 4 meetings) • Updated Project Schedule
• Quality Control Reviews and Documentation
Project Management and Project Administration

PS OMAS
Ms. Jacki Scott

Page 2 ends

January 26, 2022
La Paz Road Landslide Evaluation
Task 2.0 Data Collection and Base Mapping

2.1 Data Collection
Psomas will provide substructure utility locating services by conducting ground penetrating radar within the full width of the roadbed (northbound and southbound directions) of La Paz Road through the length of the slide area (an approximate 500-foot section) and within the Orange County Regional Park near the boring locations as depicted on the Conceptual Subsurface Exploration Location map.

2.2 Preliminary Utility Coordination
Psomas will conduct preliminary utility coordination with utility companies having facilities within the project limits. This includes reviewing utility as-built drawings obtained in Task 2.1, identifying anticipated conflicts, assessing conceptual relocation and/or protection strategies, and communicating findings to the City and utility owners. Psomas will update utility base plans based on information provided by utility companies. Psomas will maintain a utility log and conflict matrix. We will provide a conceptual cost estimate for impacted facilities, based on readily available data. It is assumed that neither potholing or utility design are required at this time and therefore are excluded from this scope of work. Correspondence with utility owners and other utility related information will be provided to the City, as required.

Task 2.0 Deliverables:
• Subsurface Utility Detection
• Utility Base Mapping
Task 3.0 Geotechnical Evaluation and Report
Ninyo & Moore, as a subconsultant to Psomas, will provide geotechnical engineering investigation, analysis, and report as described in their Proposal for Geotechnical Landslide Evaluation, dated January 7, 2022. Psomas will prepare Traffic Control Plans for La Paz Road in anticipation of geotechnical borings and installation of inclinometers per the attached Conceptual Subsurface Exploration Location map.

Plans will be submitted to the City for approval prior to field work by Ninyo & Moore. Plan check fees are assumed to be waived.

Task 3.0 Deliverables:
• Traffic Control Plans (La Paz Road)
• Geotechnical Investigation, Analysis, and Report
Task 4.0 Conceptual Street Improvement Plans
Psomas will perform conceptual engineering required to develop separate conceptual street improvement plans for temporary and permanent stability and repair of the slope and street as recommended in Task 3. The plans will only be developed to a level of detail necessary to prepare a

PSOMA S
Ms. Jacki Scott

Page 3 ends

January 26, 2022
La Paz Road Landslide Evaluation
preliminary cost estimate. These conceptual plans will be submitted to the City for review and concurrance. Concurrance is anticipated after no more than two (2) submittals.

4.1 Conceptual Temporary Street Improvement Plans
Psomas will prepare conceptual street improvement plans per the recommendations provided in Task 3 for temporary stability and repair of La Paz Road and the slope down to the Orange County Regional Park. The plans will incorporate the recommended geotechnical measures necessary to temporarily stop the movement of the landslide material below the La Paz roadbed and will include repairs to the roadway and slope itself. Geotechnical recommendations will be depicted schematically with enough detail to reflect the intended measures. The purpose of these improvements would be to allow the City to safely open the roadway to traffic on both southbound lanes on a temporary basis until the final mitigation can be determined. The anticipated conceptual improvement plans include:
• Typical Sections • Schematic Geotechnical Details
Roadway Layouts (without curb profiles) • Signing and Striping Plans Removals • Utility Plans
Grading and Drainage Plans
Given the uncertainty of the recommended improvements, plans prepared under this task are assumed to be conceptual only and not for construction. Such plans can be prepared once the geotechnical recommendations are known and upon successful negotiations of a contract amendment.

4.2 Conceptual Permanent Street Improvement Plans
Psomas will prepare conceptual street improvement plans per the recommendations provided in Task 3 for permanent stability and repair of La Paz Road and the slope down to the Orange County Regional Park. The plans will incorporate recommended geotechnical measures necessary to stop the movement of the landslide material below the La Paz roadbed to the extent practicable. Geotechnical recommendations will be depicted schematically with enough detail to reflect the intended measures.

The purpose of these improvements would be to allow the City to open the roadway safely and permanently to traffic on both southbound lanes. The anticipated conceptual improvement plans include:
• Typical Sections • Schematic Geotechnical Details
Roadway Layouts (without curb profiles) • Signing and Striping Plans Removals • Lighting Plans
• Grading and Drainage Plans • Utility Plans
Given the uncertainty of the recommended improvements, plans prepared under this task are assumed to be preliminary only and not for construction. Such plans can be prepared once the geotechnical recommendations are known and upon successful negotiations of a contract amendment.

PS OMAS
Ms. Jacki Scott

Page 4 ends

January 26, 2022
La Paz Road Landslide Evaluation
Task 4.0 Deliverables:

Draft and Final Conceptual Temporary Street Improvement Plans : Draft and Final Conceptual Permanent Street Improvement Plans Task 5.0 Cost Estimates
Psomas will develop cost estimates for the conceptual temporary and permanent improvements included in Task 4. Unit prices will be developed based on available recent bid information. Contingency will be included to account for the preliminary nature of the plans. Project Development costs including final design fees and administration, environmental clearance, and engineering construction support and administration will also be estimated.

Task 5.0 Deliverables:
• Cost Estimate for Conceptual Temporary Street Improvement Plans • Cost Estimate for Conceptual Permanent Street Improvement Plans Task 6.0 Prepare Pre-Design Report
Psomas will prepare a comprehensive pre-design report to document findings and recommendations.

The report will include discussion on the following topics:

Background Data/Existing Conditions
• Conclusions and Geotechnical Recommendations (See Scope of Work from Ninyo & Moore for details on the Geotechnical Evaluation and Report)
• Conceptual Temporary and Permanent Improvement
• Cost Estimates
• Environmental Clearance Requirements
• Schedule
• Project Development Requirements
Psomas will prepare and submit the design report, including required attachments, for review and concurrence by the City. Concurrance is anticipated after no more than two (2) submittals.

Task 6.0 Deliverables:
• Draft and Final Pre-Design Report
Assumptions:

The improvement plans will only be developed to a level of detail necessary to prepare preliminary cost estimates.

PS OMAS
Ms. Jacki Scott

Page 5 ends

January 26, 2022
La Paz Road Landslide Evaluation
• No plans or concepts for the re-establishment of the existing landscaping and irrigation on the slope(s) are included. It is assumed that the slope(s) will be re-landscaped and irrigated in kind, which will be shown with notes on the plans.
• Utility relocation or modification plans are not included. • Structural improvements will be depicted in plan view only on the street improvement plans. No structural details or calculations will be prepared.
• Subsurface utility location services include ground penetrating radar and will be conducted for the fill width of La Paz Road and in the vicinity of the three borings located within the Orange County Regional Park.
• Potholing of existing utilities is not included
• Technical provisions are not included.
• Assumptions regarding the geotechnical scope of work are included in Ninyo & Moore's scope of work on the following pages.
• If additional borings and/or inclinometers are required, these can be completed upon successful negotiation of a contract amendment.

CELEBRATING
Ninyo& Moore 35
1986 2021
Geotechnical & Environmental Sciences Consultants YEARS NINO&. MOORE
January 7, 2022
Proposal No. 04-03473B
Ms. Carrie Davis
Senior Project Manager
PSOMAS
5 Hutton Center Drive, Suite 300
Santa Ana, Arizona 92707
Subject: Proposal for Final Geotechnical Landslide Evaluation La Paz Road Between Rancho Niguel Road and Kings Road
Laguna Niguel, California
Dear Ms. Davis:

In accordance with your request, we have prepared this proposal to perform a geotechnical evaluation of the observed landslide movement located along the west side of La Paz Road between Rancho Niguel Road and Kings Road, adjacent to Laguna Niguel Regional Park, in the city of Laguna Niguel. We have prepared this proposal based on our discussions with you and with representatives of the City of Laguna Niguel (City), several site visits, preliminary review of existing files and documents for the site provided by the City, as well as review of readily available geological literature for the site vicinity. The purpose of our geotechnical services will be to evaluate the soil and geologic conditions at the site in order to evaluate the causes of the observed road distress and landslide movement as well as develop recommendations for short term and long term repair and mitigation of the landslide movement.

Based on our preliminary review of documents provided by the City, we understand that La Paz Road was originally constructed in the 1980s as a two-lane road. The road was widened to a four lane (two in each direction) in 1997 by using crib-wall retaining structures and compacted fill along the western edge of the alignment. Movement and distress was reported periodically during this time period. We understand that mitigation measures included the installation of 54, twenty-four inch- diameter caissons in 2001 to depths of approximately 30 feet. An additional 13, twenty-four inch- diameter caissons were installed to depths of approximately 50 feet, sometime after May 2008.

Based on recent site visits (December 2 and December 6, 2021), the most highly impacted area of the roadway extends approximately 500 feet along the western edge of the La Paz Road, roughly 1,000 feet north of Kings Road. Distress features include depressed and undulatory roadway and sidewalk and tension cracks and separations in the curb-and- gutter. Cracks and separations were observed in the asphalt pavement (which we understand was resurfaced in approximately May of this year) up to roughly two to three inches wide. The sidewalk in the area is tilted and cracked and 475 Goddard, Suite 200 | Irvine, California 92618 | p. 949.753.7070 | www.ninyoandmoore.com the fences adjoining the sidewalk have been distorted and racked out-of-plum. Numerous utilities were observed under the pavement or sidewalk of La Paz Road in this area including potable water, reclaimed water, gas, fiber optic cable, and telephone. We understand that La Paz Road and the adjoining sidewalk and upper portions of the slope in this area are part of the City of Laguna Niguel; the lower portions of the slope are part of Laguna Niguel Regional Park and belong to the Orange County Parks Department.

Based on review of geotechnical reports and published geologic maps, the area is mapped as underlain by a number of ancient landslides, which are in turn underlain by the Miocene-age Capistrano Formation. The Capistrano Formation is known for slope instability issues and landsliding in southern Orange County.

SCOPE OF SERVICES
We have perpared and presented a scope of work for the preliminary project review and evaluation for the project that included review of existing reports and information, performance of initial site mapping and utility mark out, and preparation for subsurface evaluation. Our scope of services for this phase of evaluation will consist of a geotechnical subsurface evaluation including laboratory analyses, engineering analyses, and preparation of a geotechnical report. Our services for this phase of work will include the following:
• Continuing project coordination.
• Traffic control measures will be performed during field operations, as appropriate, in general accordance with the previously approved traffic control plans and the WATCH manual. • Performance of a geotechnical subsurface evaluation consisting of the following:
• Drilling three (3) large-diameter soil borings (approximately 30-inches in diameter) to depths of up to approximately 60 feet below existing grades or to refusal (whichever is shallower).

The borings will be backfilled with cement bentonite grout and soil cuttings in accordance with the boring permit. Excess soil may be spread in suitable areas of the site or on the adjacent County Parks property.

The purpose of the large diameter borings will be to allow our engineering geologists to enter the borings via a winched cage to directly observe and log the earth materials and the geologic structure. This is the most accurate and effective method to evaluate the nature, depth, and thicknesses of the earth materials and to measure the location and orientation of bedding, fractures, clay seams, and slip or slide planes. Several large-diameter borings Ninyo & Moore | La Paz Road Landslide Evaluation, Laguna Niguel, California | 04-03473| January 7, 2022 2 have been performed in the area by other consultants during previous evaluations. However, the slide has moved since those explorations and the new borings will give us the most up- to-date look at the existing subsurface conditions. Based on the results of the background review and early evaluation, the proposed number and location of the large-diameter borings may be modified.
• Drilling three (3) small-diameter borings (approximately 8-inches in diameter) to depths of up to 70 feet below existing grades or to refusal (whichever is shallower). These borings would be drilled on the Orange County Parks Department property at or near the base of the slope below La Paz Road. The borings will be backfilled with cement bentonite grout in accordance with the boring permit. Excess soil may be spread in suitable areas of the site or on the adjacent County Parks property.

The purpose of these borings is to observe and sample the earth materials on or near the base of the slope and landslide and to observe the depth to groundwater at the base of the slope. Based on the results of the background review and early evaluation, the proposed number and location of the small-diameter borings may be modified. • Drilling five (5) additional small-diameter borings (approximately 8-inches in diameter) to depths of up to 70 feet below existing grades or to refusal (whichever is shallower) and installation of inclinometer casings. We propose to install two inclinometers along the east side of La Paz Road, one inclinometer in the median of La Paz Road, and two incliniometers along the west side of La Paz Road in the area of the recent slope movement. Excess soil may be spread in suitable areas of the site or on the adjacent Orange County Parks property.

Based on the results of the background review and early evaluation, the proposed number and location of the small-diameter borings may be modified.

The rationale for the number and placement of the inclinometers is several fold:
• The three inclinometers proposed to be placed on the east side of La Paz Road and within the median will be used to delineate the area of impact and landslide movement. • The purpose of the two new inclinometers along the western edge of La Paz Road would be to provide additional evaluation of movement within the existing slide mass. There are several existing inclinometers on the site, installed by other consultants, and may be available to be monitored. However, the existing inclinometers have experienced some degree of off-set due to the recent movement of the slope. Some may have become nonfunctional or may become nonfunctional at some future date due to bending or shearing of the inclinometer pipe. In that case, the two new proposed inclinometers Ninyo & Moore | La Paz Road Landslide Evaluation, Laguna Niguel, Califomia | 04-03473 | January 7, 2022 3 would provide the ability to continue to observe and monitor movement of the slope during our evaluation and before and during repair operations. • The borings will be logged by professionals from our firm, and bulk and relatively undisturbed soil samples will be collected at selected intervals for laboratory testing. The large-diameter borings will be down-hole logged by State-certified engineering geologists from our firm.

Laboratory testing of representative soil samples which may include in-situ moisture and dry density, sieve analyses, Atterberg limits, direct shear strength, and soil corrosivity, as applicable.

The laboratory testing will provide several basic parameters used for slope stability analyses including weight of the overlying soil mass, moisture content, and plasticity and shear strength of the various layers and types of earth materials present in the slope and landslide. • The new inclinometers and existing operational inclinometers would be read approximately two times per week for a period of approximately three months. Reading frequency after that period of time will be evaluated based on the results of our initial readings and the subsurface field evaluation. The frequency of readings may be increased or decreased based on our findings and evidence of continued movement of the slope.

Data compilation and geotechnical analysis of the background information, field, and laboratory data. Our analyses will include prepration of new geologic cross-sections based on previous and new subsurface data and performing slope stability analyses. The geologic cross-sections will depict the representative scaled profile of soil, formational material (along with the appropriate bedding conditions), potential landslide surface or zones of reshear, locations of signficant clay seams, and the landslide mass through the areas of concern at the project site.

The ground surface profile will be presented in detail along with signficant surficial features or improvements. Additionally, the geologic cross-sections will also present the possible groundwater table and zones of seepage based on available and new subsurface data. Each geologic cross-section will be used in developing two-dimensional slope stability model and limit equilibrium methods of analyses will be performed using a state-of-the-art slope stability analysis computer program. Both force and moment equilibriums will be evaluated for each cross-section, and static and seismic factors of safety of the potential slide planes will be analyzed. Several hundreds of potential failure surfaces (i.e., slide planes) will be evaluated for each cross-section, and the factors of safety of the most critical failure surface will be reported The objectives of such rigorous analyses will be to (1) evaluate the current stability of the affected slope; (2) compare the potential sliding planes observed in our borings and/or inferred from the inclinometer monitoring data to those obtained from the slope stability analyses; and Ninyo & Moore | La Paz Road Landslide Evaluation, Laguna Niguel, California | 04-03473 | January 7, 2022 4 (3) develop effective mitigation measures that would enhance the factors of the safety against global instability and bring those to at or above the accepted standard. • Preparation of a geotechnical report presenting our findings, conclusions, and recommendations.

Our report will include a site plan, boring location map, pertinent geologic maps, boring logs, laboratory test results, inclinometer readings, cross-sections, and slope stability analyses results. Our report will include our conclusions as to possible causes of the observed slope movement as well as recommendations for both temporary and permanent stability and repair of the slope and street.

Recommendations for short term mitigation could include installation of additional shear pins, adding tie-backs to the existing shear pins, and/or some type of shoring wall or retaining structure. Long term mitigation could include excavation and backfilling of a shear key buttress along the base of the slope on the County Park property, construction of a gravity buttress along the base of the slope on the County Park property, installation of more or larger, longer shear pins, installation of a retaining structure, removal and replacement of the existing fill underlying La Paz Road in this area, or some combination of the above measures.

Attendance at project and public meetings to present and discuss the results of our evaluation.

We have assumed attendance at five meetings.

ASSUMPTIONS
The following assumptions have been made in the preparation of our scope of services:
• Site access will be granted and our drilling equipment will be able to mobilize to the proposed drilling locations during normal working hours (Monday through Friday, 7:00 a.m. to 5:00 p.m. • The proposed project is subject to prevailing wage rates. The small diameter borings will be backfilled with a cement bentonite grout and the large-diameter borings will be backfilled with a mixture of cuttings and cement bentonite grout in accordance with the County boring permit. We have assumed excess soil cuttings may be spread in suitable areas of the site or adjacent County Park site. If the soil cuttings are required to be removed from the site, an additional scope and fee for storage, characterization, and disposal of soil cuttings can be provided. • Our firm will contact USA Dig Alert prior to performing our subsurface evaluation. PSOMAS will also provide geophysical utility location. Ninyo & Moore will not be responsible for damage to utilities encountered during subsurface exploration that have not been marked out or shown on the plans.

Ninyo & Moore La Paz Road Landslide Evaluation, Laguna Niguel, California 04-03473| January 7, 2022 5 • Our field exploration does not include sampling, testing, or chemical analysis of soil, groundwater, surface water, or other materials for the purpose of evaluating possible environmental hazards or risks. These services can be provided, if requested, as an additional scope of work.

SCHEDULE
Following receipt of the Notice-to-Proceed (NTP), Ninyo & Moore will commence the services described herein. Assuming that there are no delays due to permitting, weather, or drill rig scheduling, we anticipate that our subsurface field work can begin within approximately three weeks after receipt of the NTP and will take approximately three to four weeks. Our laboratory testing will be completed approximately three weeks after completion of the field evaluation, and our report will be issued approximately five weeks after completion of the laboratory testing. Preliminary design parameters and recommendations can be provided periodically as they are developed after completion of the field evaluation and laboratory testing upon request.

We have included as an attachment a description of a number of landslide evaluation and mitigation projects Ninyo & Moore has performed in the last several years across southern California. We have also included resumes of several key personnel who will be involved with the project.

Ninyo & Moore appreciates the opportunity to provide our services for this project and we look forward to working with you. If you have additional questions or comments, please contact the undersigned.

Respectfully submitted,

NINYO & MOORE
RaleD. All
Ronald D. Hallum, PG, CEG Daniel Chu, PhD, PE, GE
Principal Geologist Chief Geotechnical Engineer

RDH/DBC/
Attachments: Schedule of Fees
Ninyo & Moore Landslide Evaluation and Mitigation Experience Resumes of Key Personnel
Ninyo & Moore | La Paz Road Landslide Evaluation, Laguna Niguel, California | 04-03473 | January 7, 2022 6 Conceptual N&M Subsurface Exploration Locations Legend
Proposed Large-Diameter Boring Location
Proposed New Inclinometer Location
Proposed Small-Diameter Boring Location
La Pez Re
CSD
CSD
La Paz Ro
Via Pasaliempo
Google Earth
a Paz iRd
© 2021 Goggle 200

PSOMAS EXHIBIT B

COST PROPOSAL
La Paz Road Landslide Evaluation
Laguna Niguel, California

PROFESSIONAL & TECHNICAL CLASSIFICATIONS TOTALS
Psomas Ninyo & Moore
WORK BREAKDOWN STRUCTURE Project Principal Senior Project Senior Staff Technical TOTAL TOTAL DESCRIPTION Project Survey Project CADD Project Engineer/Geologist Engineer/Geologist Engineer/Geologist Engineer/Geologist/ Illustrator/CAD Data Processor MANHOURS DOLLARS Manager Engineer/Traffic Engineering Manager Surveyor Technician Assistant /Environmental /Environmental /Environmental Environmental Engineer Designer Operator
Scientist Scientist Scientist Scientist
$250.00 $180.00 $145.00 | $165.00 $150.00 $135.00 $120.00 $210.00 $200.00 $185.00 $170.00 $110.00 $75.00 Project Management and Coordination $16,180
= Periodic Progress Meetings $4,160
Project Schedule
Perform Quality Assurance and Quality Control Reviews $4,380 Project Management/Administration $7,140
Data Collection and Base Mapping 1200 $9,920
Data Collection 53,720
Freliminary Utility Coordination $5,200
- Geotechnical Evaluation and Report 16 688 $121,540

3.1 Froject Coordination, Scheduling, and Background Review $3,340 Traffic Control Plans (La Pat Road) 54,840
Subsurface Evaluation $59,610
Data Compilation and Analysis $27,330
Meetings and Report Preparation 36 $26,420
Conceptual Street Improvement Plans 224 $37,240
41 Conceptual Temporary Street Improvement Plans $20,960 # 9 = 0

4.2 Conceptual Permanent Street Improvement Plans $16,280 Cost Estimates $6,280
Prepare Pre-Design Report 72 $14,640
Other Direct Costs (see below) $82,29D
TOTAL HOURS 302 16
TOTAL COST $24,500 $25,560 $20,880 $1,320 $2,400 $10,800 $2,640 $19320 $12.000 $31,050 $51,340 $1,760 $1,200 $287,090 Drill Rie (Subcontractor - small diameter)
Drill Ria Support Vehicle $3,200
Drill Rie (Subcontractor - large diameter) $17,100
Drill Ale Moblization/Demobilizatior $3,880
Grout Backlin $6,000
Field Vehicle and Equipment Usage
Traffic Control (Setup) $3,780
Supplies $8,500
Laboratory Analysis $9,540
Reproduction $1,000
Ronald D. Hallum, PG, CEG
Principal Geologist
Mr. Hallum has provided geotechnical services for a variety of projects such as railroads, highways, hospitals, schools, pipelines, treatment plants, tunnels, reservoirs, landslide and fault evaluations, and other public and private works. Mr.

Hallum's responsibilities at Ninyo & Moore include preliminary and final review of findings, conclusions, recommendations, and project deliverables; review of current guidelines, regulations, and technologies; managing geotechnical and geologic field evaluations; supervision and training of the geologic staff; conducting geologic and geologic hazards evaluations; performing and reviewing geologic mapping and research; analyzing field and laboratory data; and authoring and reviewing geotechnical and geologic reports.

EXPERIENCE
Pepperdine University, Baseball Field Expansion, Malibu, California: Served EDUCATION as Principal geologist and down-hole logged large-diameter borings for the Baseball B.S., Geology, 1976, San Diego State Field Expansion project at Pepperdine University, In Malibu, California. The project University included expansion of the outfield and proposed storage tunnels to be excavated into an existing slope that was underlain by an ancient landslide that had been previously stabilized. N&M provided mapping and logging of large-diameter borings and slope REGISTRATIONS/ stability analyses to assure that the proposed project would not destabilize the CERTIFICATIONS remaining landslide deposits.

PG 4766 (California) Alta Mira Canyon Drainage/Erosion Control, Rancho Palos Verdes, California:

CEG 1484 (California Principal Geologist for a preliminary geotechnical evaluation for the preliminary design of the Alta Mira Canyon Drainage/Erosion/Landslide Control project. The purpose of our geotechnical services was to make a preliminary evaluation of the PROFESSIONAL soil, geologic and groundwater conditions associated with the preliminary design

AFFILIATIONS
for mitigating erosion of Alta Mira Canyon which is located within the Abalone Cove Association of Environmental and landslide in Rancho Palos Verdes. The project consisted of an evaluation of four Engineering Geologists drainage improvement options that will aid in managing the storm water flow through the Alta Mira Canyon and keeping excess runoff from entering cracks and fissures Geological Society of America
in the landslide. The options included one or a combination of various mitigated San Diego Association of Geologists measures, such as a canyon fill, new storm drains, energy dissipation systems, culverts, walls, gabions, retention basins, inlet and outlet structures and bypass systems. Services have consisted of review and research of available geotechnical literature and aerial photographs, site reconnaissance and geologic mapping, data compilation and analysis and partial preparation of a preliminary geotechnical report.

The preliminary report will include a discussion regarding the geologic and seismic hazards, anticipated soil and geologic conditions and potential impacts to the design and construction of proposed improvements.

Via de las Olas Landslide, Pacific Palisades, California: Served as Principal Geologist for the preliminary geotechnical evaluation for the Via de las Olas Landslide in Pacific Palisades, California, and helped to develop conceptual methods to stabilize portions of the Via De Las Olas roadway located above and on portions of the landslide. The project included a 400-foot-long cut slope along the north side of Sunset Boulevard between Coronado Terrace and Waterloo Street. The existing cut slope ranged from 10 to 40 feet in height and was very steep with inclinations of approximately 0.5 to 1 (horizontal to vertical) to vertical at some locations. The slope exposed dense sandstone of the Puente Formation. The sandstone ranged Ronald D. Hallum, PG, CEG, Principal Geologist | Nino & Moore | Geotechnical & Environmental Sciences Consultants 1 Ronald D. Hallum, PG, CEG (CONT.)
Principal Geologist
from uncemented friable material to well cemented concretion layers. Mr. Hallum provided logging of large-diameter borings and technical review and input for the preliminary cost estimates for the conceptual stabilization alternatives Ocean Trails Golf Course, Rancho Palos Verdes, California:Principal field and project geologist for the forensic evaluation of landsliding at the Ocean Trails Golf Course (now Trump National Golf Club Los Angeles) in Rancho Palos Verdes, California On June 2, 1999 an approximately 16-acre ancient landslide on the coastal bluff was reactivated, sliding approximately 50 feet toward the ocean. The ancient landslide destroyed much of the 18th fairway and green along with adjacent improvements including an active County sewer line. The forensic evaluation included multiple geotechnical firms in a group investigation. The geologic setting included gently to moderately tilted beds of the Monterey Formation. The Monterey Formation at this locality included interbedded sequences of fine silty sandstone, siltstones, shales, dolomitic shales, siliceous zones, and bentonitic ash beds. The basal rupture surface was formed along a relatively continuous bentonite layer at a depth of approximately 90 feet. The geologic evaluation included detailed geologic mapping, 26 large diameter borings, 2 rotary wash continuous core borings, 12 inclinometers, and the excavation and evaluation of buried sewer lines and artificial lakes. The analysis included preparation of multiple geologic cross sections, slope stability analysis, and evaluation of potential reactivation causes including seismic activity, precipitation, wave erosion, irrigation, construction activities, lake leakage, and sewer line leakage. and construction for the SR 125 Toll Road project. The southern abutment of the SR-125 bridge, that was to ultimately span the Otay River Valley, was located on top of the identified landslide mass. Based on our field and subsurface evaluations, our original recommendation was to remove the landslide materials within the SR-125 right-of-way (ROW) down to below the basal rupture surface and to replace these materials with compacted fill soils. However, due to environmental constraints, portions of the landslide mass directly adjacent to the ROW could not be disturbed. Grading of the landslide began in June 2005. During grading, Mr. Hallum made daily visits to the site to observe and map the exposed geologic structures and conditions. During removals, he observed that the landslide mass was a series of small to large landslide blocks that had moved as translational masses along relatively flat-lying basal surfaces. The majority of the movement was observed to have failed along a basal surface located at an elevation between approximately 221½ and 230 feet above mean sea level. To reduce the chances for the backcut failures extending out of the ROW and into the environmental exclusion areas, and based on our observations and mapping during removals, we performed additional calculations and provided revised recommendations for reducing the size of the removal and including construction of a gravity buttress at the base of the slope to achieve a suitable factor of safety. These measures were implemented and provided suitable factors of safety. Grading of the buttress and slope beneath the bridge abutment was completed by March 2006.

Mount Soledad Landslide, La Jolla, California - Principal field and Project Geologist during investigation of large landslide that destroyed six homes and a large section of Soledad Mountain Road. Ninyo & Moore was retained by the City of San Diego to provide the City with conclusions as to the potential causes of the landslide. Mr. Hallum participated in down hole logging 18 large diameter borings and mapping the limits and geomorphology of the landslide Ronald D. Hallum, PG, CEG, Principal Geologist | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants Daniel Chu, PhD, PE, GE
Chief Geotechnical Engineer
As Chief Geotechnical Engineerfor Ninyo & Moore, Dr. Chu is responsible forthe quality of engineering, technical approach, training of staff, and engineering assignments for the Irvine office. Dr. Chu has extensive experience providing geotechnical engineering for reservoirs, water treatment plants, pump stations, pipelines, tunnels, bridge structures, highways, and commercial developments. Dr. Chu has expertise in soil mechanics, dynamic soil behavior, seismic hazard risk assessment, static and dynamic earth loading, liquefaction, design of deep and shallow foundations, shoring systems, slope stability, erosion control, and pavement design. Dr. Chu has direct project involvement including evaluation of exploration/sampling protocol, analysis of laboratory test results, direction of engineering tasks, review of calculations, and report preparation.

EXPERIENCE
EDUCATION Storm Drain Alignment Slope Repairs, San Clemente, California: Dr. Chu was Ph.D., Geotechnical Engineering, 2006, involved in the evaluation erosion and slope failures along five separate existing University of California, Los Angeles and proposed storm drain alignments within San Clemente. The services included review of geologic maps and other background information pertinent to the site M.S., Geotechnical Engineering, 1981, excavation, sampling and logging of small-diameter exploratory borings and manually Utah State University
excavated test pits; performance of laboratory tests to evaluate shear strength and B.S., Civil Engineering, 1978, National other properties of the earth materials present; geologic mapping of the proposed Central University, Chungli, Taiwan alignments and adjacent slopes; geologic and engineering analyses.

Via de las Olas Landslide, Pacific Palisades, California: Dr. Chu provided technical REGISTRATIONS/ review for the preliminary geotechnical evaluation for the Via de las Olas Landslide in CERTIFICATIONS Pacific Palisades, California, and to develop conceptual methods to stabilize portions of the Via De Las Olas roadway located above and on portions of the landslide RCE 37991 (California)
Data compilation and geotechnical analysis of the information obtained from our GE 2096 (California background review, field reconnaissance, subsurface evaluation, and laboratory test results were per-formed in order to present several conceptual repair alternatives to stabilize the Via de las Olas roadway under various funding scenarios.

PROFESSIONAL
AFFILIATIONS Asilomar Boulevard in Pacific Palisades, California. Dr. Chu provided technica input for the evaluation of an active landslide complex beneath Asilomar Boulevard in American Society of Civil Engineers Pacific Palisades, California. The landslide extends from a headscarp area beneath California Geotechnical Engineers
Association Asilomar Boulevard down a 200-foot-high slope to Pacific Coast Highway. The active movement of the landslide threat-ened to undermine the City-owned Asilomar Boulevard and impact lower properties occu-pied by two mobile home parks. The hillside terrain facing the ocean is underlain by tilted siltstone and shale beds of the Modelo Formation. The hillside includes several landslides and periodic slope movement has been documented since 1958. Our services included compi-lation of previous geotechnical data, including boring logs, monitoring well data and incli- nometer readings.
a Pata Avenue Gap Closure and Camino Del Rio Extension Project, Orang county, California. Dr. Chu provided technical review for the geotechnical service during construction of the This project, which provides an essential link in the local roadway network, involved widening of 1.8 miles of La Pata Avenue in San Juan Capistrano, constructing 2 miles of new roadway to connect La Pata Avenue to Avenida La Pata in San Clemente, connecting Avenida La Pata to Camino Del Rio via 0.4 mile of new roadway, and construction of two bridges and two long-span -structural plate steel undereressings. Prior to construction, our services included Daniel Chu, PhD, PE, GE, Chief Geotechnical Engineer | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants 1 Daniel Chu, PhD, PE, GE
Chief Geotechnical Engineer
review of third-party review comments regarding the geotechnical design reports and preparation of comment response letters.

During construction, our services included observation and compaction testing during 12 million cubic yards of mass grading that involved removal of land-slides and construction of buttresses.

Seaview Townhomes, San Clemente, California: Dr. Chu provided consulting services relative to several surficial slope failures which occurred within the residential development. Dr. Chu supervised the engineering and slope stability analyses and developed recommendations for repairing the slope failures. Other services included observation and testing services during the repairs. The project consisted of a design evaluation including geologic reconnaissance of the slope areas, a subsurface evaluation consisting of two borings and five exploratory test pits, laboratory testing of selected soil samples, compilation and engineering analysis of the obtained data, and the preparation of a geotechnical report.

Canyon Heights Development, Anaheim Hills, California: Dr. Chu provided engineering services for numerous surficial ground failures which occurred on slopes within the Canyon Heights development in Anaheim Hills. Dr. Chu's responsibilities included providing recommendations for repairing the surficial slope failures and performing engineering observation and soil testing services during repairs to the failure areas. Other services during the repair phase included compaction testing, laboratory testing, and geologic observation and documentation of excavation bottoms and slope failure clean-outs.

Mystic Lane Landslide, Laguna Beach, California: Dr. Chu provided services for the geotechnical evaluation of an ancient landslide that reactivated in January 1993 and caused catastrophic damage to three custom-built homes on Mystic Lane in Laguna Beach. The evaluation included review of background data, analysis of pre-construction stereoscopic aerial photographs, geologic reconnaissance and mapping, logging and sampling of five exploratory test pits, and drilling, sampling and downhole logging of one large-diameter exploratory boring.

Echo Park Lake Rehabilitation Project City of Los Angeles, California (2007-2013): Chief Geotechnical Engineer providing engineering oversight during the geotechnical consulting services for the Echo Lake Rehabilitation project located in Los Angeles, California. The 13-acre Echo Park Lake is part of the existing storm drain system and provides hydraulic relief during storms. The water quality of the lake is impaired and the overall objective of the project is to improve water quality in both the lake and the Los Angeles River Watershed. Another objective is to reduce the use of municipal water to maintain the water level in the lake.

Daniel Chu, PhD, PE, GE, Chief Geotechnical Engineer | Nino & Moore | Geotechnical & Environmental Sciences Consultants 2 Michael Putt, PG, CEG
Principal Geologist
Mr. Putt is a Principal Geologist with Ninyo & Moore and has extensive experience in providing engineering geology consultation in Southern California. Mr. Putt has extensive experience on a variety of project types, including highways, bridges, bore and jack tunneled undercrossings, hillside and flat-land mass grading projects for residential, commercial, and industrial developments, pipelines, and forensic investigations. Mr. Putt performs project administration and management, prepares and reviews geologic and geotechnical reports and provides third party review services for geotechnical reports. He conducts geologic and geotechnical field evaluations, including detailed logging of large- and small-diameter borings and trenches, and geologic evaluation/mapping. Projects have included fault hazard evaluations, landslide studies, slope stability analysis, seismic refraction studies, geologic reconnaissance studies, forensic evaluations, and construction and inspection services.

EDUCATION
B.S., Geology, 1997, California State EXPERIENCE
University, Fullerton
La Pata Avenue Gap Closure Project, Orange County, California: Served as Applied Rock Slope Engineering Short Project Manager providing geotechnical consulting services during construction of the Course, 2006, Association of Engineering La Pata Avenue Gap Closure Project in Orange County, California, as part of the Hill Geologists, California Int. construction management team for the County of Orange. The project involved the widening of 1.8 miles of La Pata Avenue in San Juan Capistrano and extending the REGISTRATIONS/ roadway 2 miles to Avenida La Pata in San Clemente which will provide an essential CERTIFICATIONS link in the local roadway network. Mr. Putt responsibilities as project manager and certified engineering geologist of record include project coordination and scheduling, PG 7581 (California) oversight of field technicians, geologists, and engineers, attendance at project team CEG 2341 (California) meetings, and preparation of project correspondence, reports, invoices and budget Radiological Safety and Gauge Use management.

Certification, 1997 OCTA/SCRRA/Railroad Track Slope Stabilization Project, Irvine to San Juan Capistrano, California: Served as Principal Geologist providing a geotechnical evaluation of eight sites along the Orange County Transportation Authority owned PROFESSIONAL railroad corridor operated by the Southern California Regional Rail Authority AFFILIATIONS (SCRRA). The eight sites have experienced varied amounts of erosion from seasonal South Coast Geological Society water runoff that affects the existing rails and adjacent properties. The purpose of our evaluation was to perform surficial geologic mapping of each site in order to provide geotechnical information regarding the erosional conditions in the areas of concern and to provide recommendations for mitigation alternatives.

Sunset Boulevard Slope Stabilization, Los Angeles, California: Served as Project Geologist providing a geotechnical evaluation for Phase 1 of the Sunset Boulevard Slope Stabilization project in Los Angeles, California. The project included a 400-foot- long cut slope along the north side of Sunset Boulevard between Coronado Terrace and Waterloo Street. The geotechnical evaluation for the project included geologic mapping of the slope, evaluation of drainage conditions and analyses of stabilization alternatives. Site constraints that impacted potential solutions, included private residential property lines, proximity of street traffic lanes, utilities, and geologic conditions.

Michael Putt, PG, CEG, Principal Geologist | Nino & Moore | Geotechnical & Environmental Sciences Consultants 1 Michael Putt
Principal Geologist
Puente Hills Landfill Park Master Plan, Whittier, California: Principal Geologist performed a geotechnical feasibility evaluation forthe Puente Hills Landfill Park Master Plan Project located at the Puente Hills Landfill property in Whittier, California. Improvements included a visitor center, trail lift (gondola), scenic overlook and café, multi-use trails, open space areas, interpretive features, and other amenities that would provide benefits to local and regional communities. Mr. Putt provided a preliminary assessment of potential geologic and seismic hazards at the sites and developed preliminary conclusions regarding the geotechnical feasibility of the park improvements. The evaluation was based on review of readily available published geotechnical literature pertinent to the subject property provided by Sanitation Districts of Los Angeles County and a property reconnaissance. Additionally, Mr. Putt performed a preliminary slope stability analyses to evaluate the effect of the proposed loop road grading, scenic overlook, and trail lift tower on the buttress stabilization currently being constructed on the Nike Hill western slopes.

Wagon Wheel Creek Restoration, Coto de Gaza, California: Mr. Putt provided a geotechnical evaluation of four sites along Wagon Wheel Creek located in Thomas F. Riley Wilderness Park. Portions of Wagon Wheel Creek have experienced extensive downcutting, scour, and bank erosion from heavy rainfall and flood events that re-sulted in alteration of the channel geometry creating near-vertical slopes, undermining of exist-ing sheet pile stabilization structures, and the loss of native and riparian vegetation. Mr. Putt provided an evaluation of the subsurface soil and geologic conditions and to provide geotechnical recommendations regarding the design and construction of creek restoration measures.

City of Rancho Santa Margarita Plan Review/On-Call Geotechnical Services: Served as Project Manager for the on-call geotechnical engineering consulting ser- vices for various projects in the City of Rancho Santa Margarita. Services included third- party review of geotechnical reports, emergency observation of slope failures resulting from heavy rain events, and geotechnical observation and materials testing services for various construction projects including numerous pavement rehabilitation projects, pavement slurry seal, and drainage improvements
River Wilderness Park, Azusa, California: Mr. Putt performed a geotechnical evaluation for the proposed River Wilderness Park project located on Old San Gabriel Canyon Road in Azusa, California. The River Wilderness Park project included the construction of a concession building, a pavilion, restroom, a river overlook, a children's play area, and walking paths, as well as the construction of an overnight camping area southwest of Old San Gabriel Canyon Santa Ana Delhi Channel Widening, Newport Beach, California: Served as Project Manager for the Santa Ana-Delhi Channel Mitigation, Rehabilitation, and Coastal Access Improvement Project. The project involved the design of channel restoration improvements to address existing and future erosion issues of the channel embankment slopes. The channel slopes have experienced significant erosion during high erosive flows that have resulted in near-vertical, unstable slopes. The new design concepts are intended to decrease flow velocities by widening the channel and to construct new stabilized channel embankment slopes. The project was performed in collaboration with Orange County Public Works and Orange County Flood Control District.

Geotechnical evaluation for the project included geologic mapping of the surficial slope conditions, drilling nineteen borings up to approximately 50 feet deep, percolation testing to evaluate storm water infiltration characteristics, laboratory testing, preparation of geologic cross sections, and settlement and slope stability analyses. The geotechnical considerations for the project included temporary and permanent slope stability, settlement evaluation related to new retaining walls constructed in soft soils along the channel bottom, and preparation of geotechnical recommendations for earthwork, shoring, and foundation design in consideration of the soft soils along the channel bottom, the surface water and shallow groundwater conditions, and construction vibrations.

Michael Putt, PG, CEG, Principal Geologist | Nino & Moore | Geotechnical & Environmental Sciences Consultants 2 Spencer Marcinek, PE, GE
Senior Project Engineer
As a Senior Project Engineer for Ninyo & Moore, Mr. Marcinek assists with data acquisition, documentation, and dissemination of data related to all phases of geotechnical investigations, assists with compiling and analyzing geotechnical data obtained from both field and office research, assists with technical tasks, including geologic background review, data compilation, and cross sectional analysis for slope stability design projects and/or repair recommendations, coordinates and supervises subsurface drilling activities, conducts investigations of subsurface conditions, including site reconnaissance, mapping and logging of exploratory borings and test pits, coordinates with support staff, including technical illustrators, field and laboratory technicians, and word processors, and prepares correspondence, permit requests, geotechnical reports and other documents

EDUCATION EXPERIENCE
M.S., Geoengineering, 2012, University of La Pata Avenue Gap Closure, Orange County, California: Project Engineer California Berkeley providing geotechnical consulting services during construction of the La Pata Avenue B.S., Civil and Environmental Engineering Gap Closure and Camino Del Rio Extension Project in Orange County, California 2011, University of California Berkeley The project involved widening of 1.8 miles of La Pata Avenue in San Juan Capistrano, constructing 2 miles of new roadway to connect La Pata Avenue to Avenida La Pata in San Clemente, connecting Avenida La Pata to Camino Del Rio via 0.4 mile of REGISTRATIONS, new roadway, and construction of two bridges and two long-span structural plate

CERTIFICATIONS
steel undercrossings. Services included the design and implementation of a slope PE 82775 (California) monitoring plan to monitor the stability of temporary remedial grading cuts adjacent to SDG&E and SCE transmission lines. The plan included the design and installation of GE 3127 (California)
thirteen continuously monitored in-place inclinometer and tilt meter systems that were ACI Concrete Field Testing solar powered and transmitted data via cellular modem to a web-based monitoring Troxler Nuclear Gauge service. The plan established automatic alert levels based on ground or tower/pole movement and recommendations for actions. We also provided review of third-party 8-Hour OSHA HAZWOPER
review comments regarding the geotechnical design reports.

Santa Barbara County Reliability Project 66 kV Subtransmission Line. Santa PROFESSIONAL Barbara and Ventura Counties, California. Served as Project Engineering AFFILIATIONS providing geotechnical design services for Segments 3A, 3B, and 4 of Southern American Society of Civil Engineers California Edison's Santa Barbara County Reliability Project 66 kV Subtransmission Line project located in Santa Barbara and Ventura Counties, California. The project AVAILABILITY included the construction of approximately 16 miles of new transmission line through 85% relatively steep mountainous terrain that included the construction of 84 new tubular steel poles, drill pads, and access roads. The access road construction included regrading of existing dirt roads and hillside grading to build new roads into the sides of slopes. The evaluation was challenging given the steep terrain and seven different geologic formations along the alignment, each requiring specific geotechnical design considerations due to variations in the strengths of the materials, geologic structure and topography, and landslide susceptibility (including the presence of existing landslide
Southern California Gas Company (SoCal Gas) Areas 23E & 6E Pipe Supports, Porter Ranch, California: Served as Senior Project Engineer retained to provide geotechnical consulting services for the Southern California Gas Company's Aliso Spencer Marcinek, PE, GE, Senior Project Engineer | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants 1 Spencer Marcinek
Senior Project Engineer
Canyon Natural Gas Storage Facility Pipe Support Rehabilitation Project for Areas 6 East and 23 East located in Porter Ranch, California. The project involved the design and construction of two new pipe supports to replace existing aging and/or damage pipe supports. Services included review of regional geologic background data, evaluation of site seismicity, a geologic site reconnaissance to observe the existing pipe supports and the site geologic conditions, subsurace exploration, and laboratory testing. Cast-In-Drilled-Hole design recommendations were provided based on the subsurface bedrock conditions encountered at each location.

Southern California Edison, On-Call Geotechnical, Soils and Materials Testing & Inspection Services, California: Served as Senior Project Engineer for the on-call geotechnical design and materials testing and inspections contract for various Southern California Edison (SCE) projects. To date, over 50 task orders have been completed. Select projects have included Santa Barbara County Reliability Project, the San Joaquin Cross Valley Loop, Coolwater-Lugo, Lakeview, and Alberhill Transmission Line projects, and Mesa KV, Santiago, Victor, Rio Hondo substattion projects.

Southern California Edison - Santa Barbara County Reliability Project, Segments 3B and 4: Served as Senior Project Engineer providing geotechnical exploration and soil sampling for the Santa Barbara County Reliability Project located in Santa Barbara and Ventura Counties, California.. The purpose of this study was to evaluate the subsurface soil conditions and to provide geotechnical information to be used in design of the proposed improvements by Southern California Edison (SCE).

Edinger Well, Santa Ana, California: Served as Senior Staff Engineer providing geotechnical consulting services for the geotechnical consulting services for the design of a well facility located at 2100 East Edinger Avenue in Santa Ana, California.

Services included evaluation of the soil and geologic conditions on site and prepare design and construction recommendations pertaining to the geotechnical aspects of the project. The project includes a well pump building, well pump and discharge piping, gas chlorination equipment, generator, instrumentation and controls and a sewer connection.

Los Angeles Bureau of Engineering, Stormwater Capture Parks Program, Los Angeles, California: Senior Engineer and Project Manager retained for geotechnical consulting services for the Los Angeles Bureau of Engineering Stormwater Capture Parks Program Project located in Los Angeles County, California. The program captures up to 2,912 acre-feet of stormwater and urban runoff per year that drain from 5,868 acres within a portion of the San Fernando Valley in order to reduce the potential for flooding, improves stormwater quality, increases water supplies through stormwater capture, and provides recreational, social, and economic benefits. The project consisted of the installation of underground infiltration galleries, dry wells, catch basins, diversion structures, pump stations, hydrodynamic separator units, flow measuring devices, supervisory control and data acquisition, educational signage, and park restoration/improvements. Services included project coordination, background review, permit acquisition, coordination with Underground Service Alert for utility markout, subsurface evaluation, 15 cone penetration tests (CPTs) to depths of up to approximately 50 feet below the ground surface, percolation testing (falling head and constant head testing) in 15 borings, laboratory testing of collected samples, analytical characterization and disposal of drummed soil, compilation and analysis of the collected data, and preparation of geotechnical reports.

California American Water/Rosemead Tank, Rosemead, California: Served as Senior Staff Engineer providing geotechnical consulting services for the design and construction of the proposed new water tank at the California American Water, Rosemead Operations Center in Rosemead, California. Services include a geotechnical evaluation for design purposes. During construction we will provide geotechnical and special inspection services.

Spencer Marcinek, PE, GE, Senior Project Engineer | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants 2 Ninyo & Moore Landslide Evaluation and Mitigation Experience La Pata Avenue Gap Closure Project, San Clemente, California Ninyo & Moore provided geotechnical consulting services during construction of the La Pata Avenue Gap Closure and Camino Del Rio Extension Project in San Clemente County, California. This project, which provides an essential link in the local roadway network, involved widening of 1.8 miles of La Pata Avenue in San Juan Capistrano, constructing 2 miles of new roadway to connect La Pata Avenue to Avenida La Pata in San Clemente, connecting Avenida La Pata to Camino Del Rio via 0.4 mile of new roadway, and construction of two bridges and two long-span structural plate steel undercrossings. Prior to construction, our services included review of third-party review comments regarding the geotechnical design reports and preparation of comment response letters. During construction, our services included observation and compaction testing during 12 million cubic yards of mass grading that involved removal of landslides and construction of buttresses. We performed geologic mapping of remedial grading bottoms and temporary backcuts for buttresses, observed canyon subdrain and buttress backdrain construction, performed in-grading exploratory borings to evaluate removal of landslide deposits, and prepared geologic cross sections for slope stability analyses to evaluate adequacy of buttresses and preparation of revised buttress configurations. We also performed settlement analyses of deep fill, and we prepared geotechnical field memoranda and as-graded reports. Our as-graded reports included preparation of geotechnical maps documenting the geologic structure exposed during grading, the locations of buttress keyways and subdrains, and maps showing the locations of our field density tests. Our services also included implementation of a slope monitoring plan to monitor the stability of temporary remedial grading cuts adjacent to SDG&E and SCE transmission lines. The plan included the design and installation of thirteen continuously monitored in-place inclinometer and tilt meter systems that were solar powered and transmitted data via cellular modem to a web-based monitoring service. The plan established automatic alert levels based on ground or tower/pole movement and recommendations for actions.

Our services included review and maintenance of the monitoring system and implementation of actions following automatic alarms.

Asilomar Boulevard Landslide Evaluation, Pacific Palisades, California Ninyo & Moore was retained to evaluate an active landslide complex beneath Asilomar Boulevard in Pacific Palisades, California. The landslide extends from a headscarp area beneath Asilomar Boulevard down a 200-foot-high slope to Pacific Coast Highway. The active movement of the landslide threatened to undermine the City-owned Asilomar Boulevard and impact lower properties occupied by two mobile home parks. The hillside terrain facing the ocean is underlain by tilted siltstone and shale beds of the Modelo Formation. The hillside includes several landslides and periodic slope movement has been documented since 1958. Our services included compilation of previous geotechnical data, including boring logs, monitoring well data and inclinometer readings.

Our field services included geologic mapping of the landslide areas and subsurface exploration. Nine large diameter borings to depths of 40 to 90 feet were drilled and down-hole logged by our engineering geologists. Two additional slope inclinometers were installed and three new monitoring wells were installed. Periodic groundwater and inclinometer measurements were performed during our field evaluation. The previous geologic data and our new subsurface information were used to Ninyo & Moore | La Paz Road Landslide Evaluation, Laguna Niguel, California 04-03473| January 7, 2022 7 prepare multiple geologic cross sections. Laboratory testing included in-situ moisture and density, gradations, Atterberg limits, expansion index, and shear strength testing. Stability analyses were performed to evaluate the existing slope stability, to evaluate alternative stabilization methods and to evaluate temporary construction excavation conditions (back-cut stability). Alternative stabilization measures considered included drilled shear pins with tie-back anchors, buttress shear keys, and hydro-augers for dewatering. Our work was performed with on-going consultation and review by the City Geotechnical Engineering Division (GED) as well as consultants for the mobile home park land owners. Project challenges included difficult drilling in dense/cemented materials, groundwater seepage conditions, limited access in steep terrain, and the complex subsurface conditions that included multiple landslide zones. Our evaluation delineated the active landslide zone and developed mitigation measures to stabilize Asilomar Boulevard and to provide practical measures to enhance the stability of the lower slope areas.

Haskell Canyon Switching Station, Los Angeles County, California Ninyo & Moore provided geotechnical consulting services during the design phase of the Haskell Canyon Switching Station project located near Santa Clarita in Los Angeles County for the Los Angeles Department of Water and Power (LADWP). We performed an initial geotechnical evaluation for the proposed switching station, transmission towers, access roads and associated improvements.

Proposed cut slopes and fill slopes exceed 150 feet in height. The stability of proposed cut and fill slopes and large-scale landslides were evaluated with 10 bucket auger borings over 90 feet in depth and 18 backhoe test pits.

During grading to stabilize a large on-site landslide, the landslide began to move, threatening two large electrical transmission towers. We performed additional mapping, subsurface evaluation, and slope stability analyses and within a week had designed a new stabilization method including placement of approximately 130, thirty- to fifty-foot long, three-foot diameter reinforced shear pins to stabilize the landslide and overlying slope. We then performed observation and confirmation services during installation of the shear pins to confirm design placement and depths had been attained. After completion of the shear pin installation and construction, the area has shown no evidence of additional movement.

Ocean Trails Golf Course, Rancho Palos Verdes, California Ninyo & Moore performed a forensic evaluation of landsliding at the former Ocean Trails Golf Course (now the Trump National Golf Club Los Angeles) in Rancho Palos Verdes, California. An approximately 16-acre ancient landslide on the coastal bluff was reactivated, sliding approximately 50 feet toward the ocean. The ancient landslide destroyed much of the 18th fairway and green along with adjacent improvements, including an active County sewer line. The forensic evaluation included multiple geotechnical firms in a group investigation. The geologic setting included gently to moderately tilted beds of the Monterey Formation. The Monterey Formation at this locality included interbedded sequences of fine silty sandstone, siltstones, shales, dolomitic shales, siliceous zones, and bentonitic ash beds. The basal rupture surface was formed along a relatively continuous bentonite layer at a depth of approximately 90 feet. The geologic evaluation included detailed geologic mapping, 26 large diameter borings, 2 rotary wash continuous core borings, 12 Ninyo & Moore La Paz Road Landslide Evaluation, Laguna Niguel, California | 04-03473 January 7, 2022 8 inclinometers, and the excavation and evaluation of buried sewer lines and artificial lakes. The analysis included preparation of multiple geologic cross sections, slope stability analysis, and evaluation of potential reactivation causes including seismic activity, precipitation, wave erosion, irrigation, construction activities, lake leakage, and sewer line leakage.

Mount Soledad Road, La Jolla, California
Ninyo & Moore evaluated the October 3, 2007 landslide on Soledad Mountain Road in La Jolla, California for the City of San Diego. The project included an evaluation of the cause of the landslide, evaluation of conditions at homes involved in litigation. The project presented issues for geotechnical investigation under a critical schedule to evaluate the causes of landslide reactivation and to stabilize the hillside and re-open Soledad Mountain Road, a major artery, for traffic. Interim slide stabilization had to also occur prior to onset of winter rains. Our investigation had to begin immediately upon notification of the slide movement by the City. Large-diameter borings were downhole logged by engineering geologists to evaluate landslide geometry and characteristics.

Simultaneously small diameter borings were used to obtain hundreds of samples for soil moisture and other testing in order to identify if water from existing utilities and other sources could have been a contributing factor to slide reactivation. Construction repairs utilized a combination of grading, reinforced concrete shear pins, geofabrics and drainage improvements for stabilization.

Our field evaluation included drilling and logging small diameter borings, excavating trenches and test pits, downhole logging of large diameter borings by a Certified Engineering Geologist, logging and sampling shear pin borings, and detailed evaluations of the homes damaged or destroyed in the landslide. Our laboratory tested over 2,500 samples in support of the evaluation.

Via de las Olas Landslide, Pacific Palisades, California Ninyo & Moore was retained to perform a preliminary geotechnical evaluation for the Via de las Olas Landslide in Pacific Palisades, California, and to develop conceptual methods to stabilize portions of the Via De Las Olas roadway located above and on portions of the landslide.

Our services included subsurface exploration consisting of drilling, logging, and sampling of four small-diameter borings and three large-diameter borings along the top of the landslide headscarp.

Four 85-millimeter (3.34-inch) Slope Indicator casings were installed and monitored in the small- diameter borings and downhole logging was performed in the large-diameter borings. The large- diameter borings were backfilled with one-sack slurry and the soil cuttings from the drilling activities were placed in bins and transported off site.

Ninyo & Moore also performed heavy brush clearing on the landslide mass in order to located, assess, and clean out a subsurface hydrauger drainage system consisting of 32 hydraugers that were installed in the 1980's to drain and help stabilize the landslide mass. The hydrauger cleaning consisted of inserting a hydro-jet nozzle into the 1½ inch PVC pipe of the daylighted portion of the hydraugers to depths of up to approximately 410 feet. The hydro-jet injected approximately 3,000 pounds per square inch of water pressure to clean out a variety of materials, including sediments, roots, precipitates, and decomposing organic matter.

Ninyo & Moore La Paz Road Landslide Evaluation, Laguna Niguel, California 04-03473 January 7, 2022 Data compilation and geotechnical analysis of the information obtained from our background review, field reconnaissance, subsurface evaluation, and laboratory test results were performed in order to present several conceptual repair alternatives to stabilize the Via de las Olas roadway under various funding scenarios. Ninyo & Moore also prepared preliminary cost estimates for the conceptual stabilization alternatives.

OCTA/Metrolink/Mile 195 Slope Repair, San Juan Capistrano, California Ninyo & Moore was retained to provide geotechnical consulting services relative to design alternatives to stabilize a landslide adjacent to Oso Creek in San Juan Capistrano affecting a city street, several underground utility lines, and the track alignment for rail traffic between Orange and San Diego Counties. Our services included geologic field mapping, review of aerial photographs and existing background materials including boring logs and inclinometer data, slope stability calculations and other geotechnical analyses to develop repair alternatives. Based on the results of our evaluation, partial filling of Oso Creek and construction of a lined channel was recommended to stabilize the landslide, as well as mitigate the potential for slope instability in adjacent areas.

Harris/San Ramon Canyon Storm Drain, Rancho Palos Verdes, California The City of Rancho Palos Verdes planned to improve drainage conditions along the San Ramon Canyon, which traverses the South Shores Landslide to the ocean. Erosion and siltation along the canyon have resulted in clogging of storm drains, flooding and undermining canyon slopes and activation of the Tarapaca Landslide. The drainage improvements include construction of canyon subdrain systems, partial canyon filling and buttressing of the Tarapaca Landslide, construction of 4,000 feet of 54-inch storm drain, nearly 2,000 feet of tunneling, construction of a mid-canyon inlet structure, construction of a sea-bluff outlet structure and construction of access roads in the relatively steep landslide and canyon terrain. The project is intended to improve drainage along the canyon and reduce the potential for future landslide movement. Ninyo & Moore performed a geotechnical evaluation for the design of the project elements. Our services included coordination with the City geologist and design team, review of geologic background data, field geologic mapping, exploratory borings to depths up to 131 feet, continuous core sampling, optical televiewer and suspension logging of boreholes, backhoe test pits, laboratory testing and engineering analysis.

Multiple geologic cross sections were prepared to evaluate the planned construction activities and slope stability. Our geotechnical report for the project included design recommendations for the canyon grading, tunneling, material engineering properties, trenching, and inlet and outlet foundation systems. Inlet and outlet structures involved temporary excavations utilizing soldier piles and tie-back anchors. Soldier piles were also designed to stabilize planned access road slopes.

Ninyo & Moore La Paz Road Landslide Evaluation, Laguna Niguel, California 04-03473| January 7, 2022 10 Schedule of Fees
Hourly Charges for Personnel
Professional Staff
Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist $ 210 Senior Engineer/Geologist/Environmental Scientist $ 200 Senior Project Engineer/Geologist/Environmental Scientist $ 195 Project Engineer/Geologist/Environmental Scientist $ 185 Senior Staff Engineer/Geologist/Environmental Scientist $ 170 Staff Engineer/Geologist/Environmental Scientist $ 155
GIS Analyst $ 130
Technical Illustrator/CAD Operator $ 110
Field Staff
Certified Asbestos/Lead Technician $ 195
Field Operations Manager
Nondestructive Examination Technician (UT, MT, LP) $ 125 Supervisory Technician $ 120
Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) $ 115 Senior Technician $ 110
Technician $ 110
Administrative Staff
Information Specialist $ 90
Geotechnical/Environmental/Laboratory Assistant $ 95
Data Processor $ 75
Other Charges
Concrete Coring Equipment (includes technician) $ 190/hr Anchor Load Test Equipment (includes technician) $ 190/hr GPR Equipment $ 180/hr
Inclinometer $ 100/hr
Hand Auger Equipment $ 80/hr
Rebar Locator (Pachometer) $ 25/hr
Vapor Emission Kit $ 65/kit
Nuclear Density Gauge $ 12/hr
X-Ray Fluorescence $ 70/hr
PID/FID $ 25/hr
Air Sampling Pump $ 10/hr
Field Vehicle $ 15/hr
Expert Witness Testimony $ 450/hr
Direct Expenses Cost plus 15 %
Special equipment charges will be provided upon request.

Notes
For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charge for work performed in excess of 8 hours in one day Monday through Friday and all day on Saturday. Rates at twice the regular rates will be charged for all work in excess of 12 hours in one day, all day Sunday and on holidays.

Field technician and special inspection hours are charged at a 4-hour minimum, and 8-hour minimum for hours exceeding Invoices are payable upon receipt. A service charge of 1.5 percent per month may be charged on accounts not paid within 30 days.

Our rates will be adjusted in conjunction with the increase in the Prevailing Wage Determination during the life of the project, as applicable.

The terms and conditions are included in Ninyo & Moore's Work Authorization and Agreement form.

Ninyo & Moore La Paz Road Landslide Evaluation, Laguna Niguel, Califomia 04-03473 January 7, 2022 CA12