To:

FROM:

DATE:

SUBJECT:

CITY OF LAGUNA NIGUEL

CITY COUNCIL AGENDA ITEM
Honorable Mayor and Council Members
Jacki Scott, Public Works Director/City Engineer
May 6, 2025
Approval of the Construction and Reimbursement Agreement with Moulton Niguel Water District for the Crown Valley Pipelines Replacement Project

RECOMMENDATION
Staff recommends that the City Council:

1. Approve the Construction and Reimbursement Agreement with Moulton Niguel Water District (MNWD) in the amount of $172,000 for additional paving work on Crown Valley Parkway for the MNWD Crown Valley Pipelines Replacement Project;

2. Authorize the Public Works Director/City Engineer to process change orders for unforeseen conditions in an amount not to exceed 20% of the agreement for $34,400, for a total not-to-exceed amount of $206,400 if needed; and,

3. Authorize the City Manager to execute the Construction and Reimbursement Agreement with Moulton Niguel Water District.

BACKGROUND
The Moulton Niguel Water District (MNWD) Crown Valley Pipelines Replacement Project involves installing approximately 1.75 miles of new dual 12-inch sewer force mains and a 12-inch water transmission main along Crown Valley Parkway within the Cities of Laguna Niguel and Dana Point.

In April 2023, the MNWD Board of Directors awarded a construction contract to T.E.

Roberts to complete the project. Work on the project began in September 2023 and remains on track for completion by June 2025. Public outreach efforts were highly coordinated between MNWD and the City, ensuring timely communication with the community and contributing significantly to the project's overall success.

ANALYSIS
The replacement of the critical water and sewer systems was a major infrastructure effort that affected the northbound and southbound lanes, as well as the median, along Crown Valley Parkway from Hillhurst Drive to Camino Del Avian. As part of the initial project Page2
scope, MNWD planned pavement restoration only in the areas directly impacted by the physical pipeline installation. Over the past several months, City staff collaborated extensively with MNWD to establish the final paving limits for the project, requesting to also include slurry sealing and restriping of the non-impacted area of southbound Crown Valley Parkway between Hillhurst Drive and Club House Drive to meet current standards.

A location map is provided as Attachment "A".

To ensure a seamless restoration along the entire Crown Valley Parkway project corridor, the City requested that MNWD also manage the additional paving and restriping work for the non-impacted area using its contractor, T.E. Roberts, under the current construction contract. This approach is anticipated to streamline efforts, promoting efficiency and result in cost savings. The area shown in blue on the Attachment "A" location map is the non­ impacted area that MNWD is not required to repave as they did not do any work in that area; however, the City wishes to slurry seal this area so that the condition of the roadway is consistent. The area shown in red on the Attachment "A" location map will be slurry sealed by MNWD as required under their encroachment permit with the City.

Under the terms of the proposed reimbursement agreement, MNWD would oversee the execution of the work through its ongoing contract with T. E. Roberts, while the City would cover the costs associated with the additional paving and restriping, including inspection and testing responsibilities so that MNWD does not incur extra oversight expenses.

MNWD staff is in support of the approach and is recommending that the MNWD Board of Directors approve the reimbursement agreement at its meeting on May 8, 2025.

Pursuant to Laguna Niguel Municipal Code Section 3-6-6, the purchasing officer may authorize the purchase of supplies, equipment, or services for which the city would normally follow its own bid procedures from a vendor who has been awarded by another public agency a contract for the purchase of the same supplies, equipment, or services if said agency utilized procedures substantially the same as those normally utilized by the City in awarding its contract to the vendor. In other words, the City is authorized to procure services through a contractor already selected by another public agency provided that similar procurement procedures were followed.

Staff recommends that the City Council approve the reimbursement agreement with MNWD in the amount of $172,000 for the additional paving work, authorize the Public Works Director/City Engineer to process change orders for unforeseen conditions in an amount not to exceed 20% of the agreement, and authorize the City Manager to execute the reimbursement agreement. The reimbursement agreement is provided as Attachment "B".

Approval of the proposed agreement supports City Council Goal 2 (Fiscal Sustainability) and Goal 4 (Infrastructure and Technology) of the City's adopted Strategic Plan. This project is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines - California Code of Regulations, Chapter 3 (Guidelines for Implementation of CEQA), Article 19 (Categorical Exemptions), Section 15601 (b )(3).

Page3

ALTERNATIVES CONSIDERED
The City Council may decide not to approve the reimbursement agreement and direct staff to manage the additional paving work under a City contract. Staff believes that re­ advertising the project will not yield lower bids. Additionally, delaying the restoration would result in additional impacts to the community such as a longer construction duration and increased costs due to contractor mobilization.

FISCAL REVIEW
The estimated cost of the non-impacted roadway restoration on Crown Valley Parkway is $172,000. There are sufficient funds in the Fiscal Year 2024-25 Public Works Department Capital Improvement Program budget to cover the reimbursement to MNWD in accordance with the agreement.

LEGAL REVIEW
The City Attorney's Office has reviewed and approved the reimbursement agreement as to form. The reimbursement agreement was also reviewed and approved as to form by MNWD's attorney.

CONCLUSION
Staff recommends that the City Council:

1. Approve the Construction and Reimbursement Agreement with Moulton Niguel Water District (MNWD) in the amount of $172,000 for additional paving work on Crown Valley Parkway for the MNWD Crown Valley Pipelines Replacement Project;

2. Authorize the Public Works Director/City Engineer to process change orders for unforeseen conditions in an amount not to exceed 20% of the agreement for $34,400, for a total not-to-exceed amount of $206,400 if needed; and,

3. Authorize the City Manager to execute the Construction and Reimbursement Agreement with Moulton Niguel Water District.

Tamara S. Letou~ ~ ~?b-5
City Manager Pu2 Works Director/City Engineer
Page4
Attachments:

A. Location Map
B. Construction and Reimbursement Agreement with MNWD

ATTACHMENT A
Location Map

VICINITY MAP
-~
LEGEND
- MNWD Project Limits
(North/Southbound)
- Additional Paving
Requesl.ed by City
(Southbound)
Crown Valley Parkway Additional Paving j_l \
MNWD Pipelines Project W
Location Map N

ATTACHMENT B
Construction and Reimbursement Agreement with MNWD

CONSTRUCTION AND REIMBURSEMENT AGREEMENT

MOULTON NIGUEL WATER DISTRICT

CROWN VALLEY PIPELINES REPLACEMENT PROJECT
CONTRACT NOS. 2013.005, 2015.006, AND 2019.037
THIS AGREEMENT ("Agreement") is dated and effective as of the __ day of May, 2025 ("Effective Date"), by and between the MOULTON NIGUEL WATER DISTRICT, hereinafter referred to as "MNWD," and the CITY OF LAGUNA NIGUEL hereinafter referred to as "Q!Y.." MNWD and City are sometimes referred to in this Agreement individually as "Party," or jointly as "Parties."

RECITALS
A. MNWD has been replacing pipeline infrastructure within Crown Valley Parkway since September 2023 as part of the Crown Valley Pipelines Replacement Project hereinafter referred to as the "MNWD Project" and will be repaving the affected portions of Crown Valley Parkway in coordination with the City under Encroachment Permit No. PWE23-0358.

B. City desires to pave a portion of Crown Valley Parkway that is outside of the paving limits established for the MNWD Project.

C. With the intent ofreducing costs and reducing impacts to the community, the Parties desire to enter into this Agreement to establish the terms and conditions whereby MNWD will perform the work to pave a specific portion of Crown Valley Parkway as more particularly described in Exhibit "A" attached hereto ("City Work") and City will reimburse MNWD for MNWD's cost to construct the City Work. The City Work includes, but is not limited to, materials, supplies, utilities, labor, construction, and related services or activities for construction and installation of the City Work.

AGREEMENT
NOW THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are acknowledged, the Parties agree as follows:

1. Contract for the Citv Work: MNWD Activities to Administer the Contract - The construction and administration of the City Work shall be performed pursuant to the existing MNWD­ administered construction contract ("MNWD Contract"), to which the City Work will be added by change order. MNWD shall administer the construction of both the MNWD Project and City Work including, but not limited to, the activities described below. (a) Administer the MNWD Contract. Administer the MNWD Contract pursuant to MNWD's rights and obligations in regard to public works construction projects under applicable law and MNWD policy. For example, and not by way of limitation, MNWD shall have the right to engage in construction management and otherwise take any and all actions it deems necessary for construction of the MNWD Project and the City Work.
(b) Change Order to the MNWD Contract. MNWD will execute a change order to the MNWD Contract to include the City Work consistent with Exhibit "A". (c) Furnish Construction Schedule to City. Furnish City with a construction schedule which shall show the order, dates and locations in which the MNWD contractor for the MNWD Contract ("MNWD Contractor") proposes to carry out the various parts of the City Work, including estimated start and completion dates. (d) Construct City Work Pursuant to City-Approved Plans. Cause the City Work to be constructed in accordance with the City-approved plans and designs.

2. MNWD Performance for the City Work
(a) Shop Drawings for City Work. MNWD will provide shop drawing submittals for the City Work for City's review and approval, which approval shall not be unreasonably withheld or delayed. City shall review and comment on all shop drawing submittals within 5 "Working Days" from the date received by City. "Working Day(s)" means Monday through Friday, excluding observed City holidays. (b) City Inspector and MNWD Representative. City shall furnish representatives to perform the usual functions of an inspector ("City Inspector") who shall be responsible for monitoring and inspecting, including providing any required testing, of the MNWD Contractor's performance of the City Work. MNWD, at its discretion, has the right to furnish a representative ("MNWD Representative") to assist over-seeing the City Work.

The MNWD Representative and City Inspector shall cooperate and consult with each other regarding the City Work.
(c) Notice to Commence City Work. MNWD, through the MNWD Representative, shall provide notice at least 72 hours in advance to the City Inspector of when City Work is scheduled to commence.
(d) MNWD Contract Change Orders for City Work. MNWD will issue MNWD Contract change orders ("MNWD CCOs ') as may be required for the City Work, but only after review and written approval by City. City shall be solely responsible for all MNWD CCO costs pertaining to the City Work. City shall not unreasonably withhold consent to such MNWD CCOs and shall approve within 5 Working Days from receipt of a MNWD CCO. Any MNWD CCO that is not disapproved within 5 Working Days shall be deemed approved. City shall pay to MNWD the cost of such MNWD CCOs within 30 days of receipt of a written request for such payment from MNWD.

3. Provisions Included in the MNWD Contract - MNWD has included the following MNWD Contractor requirements in the MNWD Contract for the benefit of City:
(a) Insurance - The MNWD Contractor shall be required to obtain and keep in full force and effect throughout the duration of the MNWD Project, including the City Work, for the benefit of City, Commercial General Liability insurance with a limit of at least two million dollars ($2,000,000) per occurrence with a minimum aggregate of at least four million dollars ($4,000,000) and Commercial Automobile Liability insurance with a 2 limit of at least one million dollars ($1,000,000). The MNWD Contractor shall also be required to maintain worker's compensation coverage as required by law, with a waiver of subrogation endorsement against City.
(i) Policy Terms and Conditions. Said insurance policies shall name City, and their elected and appointed officials, officers, employees and agents, as additional insureds.
(b) Indemnification. The MNWD Contract shall include terms for the MNWD Contractor to indemnify the City, and City elected and appointed officials, officers, employees, and agents, which shall be consistent with the MNWD Contractor's indemnity applicable to MNWD.
(c) Warranty. The MNWD Contractor shall provide a one-year warranty for the MNWD Project, which includes the City Work.

4. Completion and Acceptance of the City Work
(a) MNWD Final Accounting Report for the City Work. Upon completion of the City Work and City's written acceptance thereof, MNWD will provide a final accounting report to City. The report will detail the bid item costs for the City Work and require City's approval, which approval shall not be unreasonably withheld or delayed. (b) MNWD Additional Costs for City Work. MNWD shall invoice City for the balance of any additional costs incurred by MNWD, and approved by City, not otherwise paid for said City Work. City shall pay MNWD within 30 calendar days ofreceipt of said mvo1ce.
(c) City Acceptance of City Work. Within IO calendar days from MNWD certifying, in writing, full completion of the City Work, and the date thereon, City shall provide its written acceptance for the City Work. If the City Work is not disapproved by the City within such 10 day period, the City Work shall be deemed approved by the City.

5. Environmental and Regulatory Compliance
(a) Parties' Performance of Their Activities. The Parties shall perform their respective activities under this Agreement in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Each Party shall perform their respective activities to avoid injury or damage to any person or property.
(b) Parties' Compliance with Applicable Law. In carrying out its respective activities, each Party shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations. Each Party shall be liable to the other Party for all violations of such laws and regulations in connection with their respective activities.

Each Party shall be responsible for securing, at its own expense, and paying for all permits and licenses necessary to perform their respective activities. 3 (c) MNWD Compliance with All Legal and Regulatory Requirements. MNWD shall be responsible for compliance with any and all legal and regulatory requirements which may apply to the MNWD Project and the City Work including, but not limited to, environmental compliance and prevailing wage laws.

6. City Reimbursement to MNWD for City Work
(a) City Work Cost. City agrees to reimburse MNWD the total amount of One Hundred Seventy-Two Thousand Dollars ($172,000), plus any cost adjustments resulting from any MNWD CCO's previously approved by the City, to construct the City Work ("lli.

Work Cost"), to be paid in one final payment as set forth herein. (b) City Final Payment for City Work. Upon completion and City's written acceptance of the City Work, and within 30 calendar days of receipt of an invoice and final accounting report from MNWD, City shall provide to MNWD final payment for the City Work. (i) Scope of Cost for City Work to be Reimbursed Through Final Payment. The outstanding costs for City Work to be reimbursed through the final payment will include the actual sum of the line-item prices for the construction of the City Work as listed in Exhibit "A", adjusted by MNWD CCOs previously approved by City for the City Work, if any.

7. Term and Termination
(a) Term of this Agreement. This Agreement shall be effective as of the Effective Date and shall remain in effect until the City Work is complete and all activities have been performed as stated in this Agreement, unless otherwise terminated pursuant to this Section.
(b) Termination by Notice to the Other Party. Either Party may terminate this Agreement at any time with l O days prior written notice to the other Party, provided City shall remain responsible for all costs incurred by MNWD for the City Work and other work incurred prior to the termination and not otherwise paid by City as agreed herein. City shall further be and remain responsible for any future City Work costs arising after such termination that cannot otherwise be mitigated under the terms of the MNWD Contract with the MNWD Contractor.
(c) Notice of Termination. Any notice of termination authorized under this Agreement shall be in writing and shall state the date upon which the termination is to be effective. (d) Termination by Default. If either Party believes that the other Party has failed to perform any obligation of that Party in accordance with the terms of this Agreement ("Default"), the Party alleging the Default shall provide written notice ("Default Notice") to the other Party, setting forth the nature of the alleged Default. Unless otherwise provided by a specific term of this Agreement, the Party claimed to be in Default shall have: (i) with respect to a Default involving the payment of money, 10 days after its receipt of the Default Notice to completely cure such Default; and (ii) with respect to any other type of Default, 30 days from the receipt of the Default Notice to 4 completely cure such Default or, if such Default cannot reasonably be cured within such 30 day period, to commence the cure of such Default within the 30 day period and diligently prosecute the cure to completion thereafter. If the Party claimed to be in Default does not cure such Default within the time periods and procedures as set forth herein, the Party alleging Default may then terminate this Agreement and/or pursue any other applicable remedies.

8. Indemnification
(a) Mutual Indemnity. Except where caused by the active negligence, sole negligence, or willful misconduct of the Indemnitee, its directors, officers, employees, and authorized volunteers, each Party ("Indemnitor") hereby agrees to defend, indemnify and hold free and harmless the other Party ("lndemnitee") from and against any and all liability, expense, including defense costs and legal fees, and claims for damages of any nature whatsoever, including, but not limited to, bodily injury, personal injury, death or property damage, arising from or connected with Indemnitor's performance under this Agreement, including any Worker's Compensation suits, liability, or expense, arising from or connected with services performed on behalf of Indemnitor by any person pursuant to this Agreement. The Indemnitor's duty to indemnify Indemnitee shall survive the expiration or other termination of this Agreement as to any injuries, occurrences or claims occurring or alleged to have occurred prior to its expiration or termination.
(b) Indemnity for CEQA Requirements and Legal Compliance. For example, and not by way of limitation, the indemnification obligations set forth herein shall apply to acts or omissions of the lndemnitor in connection with CEQA requirements and compliance with laws, rules and regulations which apply to the Indemnitor. ( c) Section 895.4 of the Government Code and Approval of Counsel. The obligations set forth above shall be in accordance with the provisions of Section 895.4 of the Government Code and the Indemnitor shall defend with counsel approved in writing by Indemnitee, which approval shall not be unreasonably withheld or delayed.

9. General Provisions
(a) Modification; Entire Agreement. This Agreement constitutes the entire agreement between the Parties and supersedes all prior understandings and agreements, if any, between the Parties with respect to the subjects hereof. This Agreement may only be modified in a writing specifically referencing this Agreement and signed by both Parties.
(b) Severability. If any part of this Agreement is held, determined, or adjudicated to be illegal, void, or unenforceable by a court of competent jurisdiction, the remainder of this Agreement shall be given effect to the fullest extent reasonably possible. (c) Authority and Counterparts. The Parties represent and warrant that this Agreement has been duly authorized and executed and constitutes the legally binding obligation of 5 each Party, enforceable in accordance with its terms. This Agreement may be executed in counterparts, and each counterpart shall be deemed to be an original. (d) Notices. All notices or other communications provided for herein shall be in writing and shall be personally served or delivered by United States mail, registered or certified, return receipt requested, postage prepaid, addressed as follows. In addition, such notices and communications may be provided via email with a read-receipt or other confirmation procedure as may be agreed upon and/or implemented between the Parties.

Moulton Niguel Water District
Director of Engineering
26161 Gordon Road
Laguna Hills, CA 92653
City of Laguna Niguel
City Manager
30111 Crown Valley Parkway
Laguna Niguel, CA 92677
Either Party may, by notice to the other Party, designate a different address for notices which shall be substituted for that specified above. Any notice given as provided in this paragraph shall be deemed to have been received, if personally served, as of the date and time of service, or if deposited in the mail as provided above, forty-eight ( 48) hours after deposit in the mail.
( e) Governing Law. This Agreement has been executed in the State of California and shall be governed by the laws of the State of California. In the event of any legal action to enforce or interpret this Agreement, the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California. The Parties hereby submit to the jurisdiction of such court, notwithstanding Code of Civil Procedure, Section 394. (t) Relationship of the Parties; No Third-Party Beneficiary. This Agreement is by and between MNWD and City and is not intended and shall not be construed to create, as between MNWD and City any agency, servant, employee, partnership, joint venture, association or other relationship. Nothing in this Agreement shall be deemed to provide for, nor create a third-party beneficiary.
(g) No Waiver. The failure of either Party to insist upon strict performance of any of the covenants or conditions of this Agreement shall not be deemed a waiver of any (i) right or remedy that the Party may have, (ii) right to require strict performance of all the terms, covenants and conditions of this Agreement thereafter, or (iii) remedy for the subsequent breach or default of any term, covenant, or condition of this Agreement. (h) Legal Fees and Costs. Should litigation be necessary to enforce any terms, covenants or provisions of this Agreement, then each Party shall bear its own litigation and collection expenses, witness fees, court costs, and attorney's fees. 6 IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by their duly authorized representatives on the Effective Date.

CITY OF LAGUNA NIGUEL
Date: By:

Tamara Letourneau, City Manager

MOUL TON NIGUEL WATER DISTRICT
Date: By:

Joone Kim-Lopez, General Manager
7 EXHIBIT "A"
Description of the City Work
8 TE@/
Roberts

IN CORPORATED
' ltltl l f l Cll l llllt t~ UIU JOI
17771 Mitchell North
Irvine, CA 92614
Phone (714) 669-0072 Fax (714) 200-0241
To: Moulton Niguel Water District
26161 Gordon Road
Laguna Niguel, CA 92653
Attn: Marius Jaskula {[email protected])
Change Order Request
No.20
Date: 4/18/2025
Additional Crack Fill & Slurry Seal
Crown Valley Parkway
MNWD #6193 - Crown Valley Pipelines Replacement Project (C# 2013.005, 2015.006, 2019.037)
DESCRIPTION QUANTITY UOM Unit$ TOTAL
Crack Filling & Slurry Seal - Additional
crack filling and slurry seal work identified
during the course of the project. The
scope and associated costs are outlined in
the attached proposal from All American 1 LS $172,000.37 $172,000.37 Asphalt. This work is necessary to ensure the long-term performance and integrity of
the pavement surface. *Pricing includes
Reas Slurry as well as striping to the latest
standard.*
Days Ext . TOTAL $172,000.37 (1)
T.E. Roberts, Inc.

THANK YOU FOR YOUR BUSINESS!
A-1 of 7
r,®/
Roberts

INCORPORATED
Gl ■ ltU l&" ■ UtU.4 «••11,.«1~1
17771 Mitchell North
Irvine, CA 92614
License#: 603008
TYPE
LABOR
E.QUlp_MENT

SUBCONTRACTOR
All American Asphalt - Quote
COR I #20
Job# I MNWD
6193 I Crown Valley
Contract# C# 2013.005, Marius Jaskula
2015.006, 2019.037 Days Ext: I 1
**Rates good through 06/30/2025**
DATE: 4/18/2025
LOCATION: Crown Valley Parkway
Crack Filling & Slurry Seal - Additional crack filling and slurry seal work identified during the course of the project. The scope and associated DETAILS: 1costs are outlined in the attached proposal from All American Asphalt. This work is necessary to ensure the long-term performance and integrity of the pavement surface. *Pricing includes Reas Slurry as well as striping to the latest standard.*

TOTAL(S)

ST RATE ST HRS ST AMT OT RATE OT HRS OT AMT DTRATE DTHRS DTAMT TOTAL LABOR TOTAL $0.00
RATE HRS.

EQUIPMENT TOTAL $0.00
Sub Total Tax AMOUNT 00/o TOTAL
Furnish & Place Crack Fill/Reas Slurry -165,700-SF@ $0.89 147,473.00 147,473.00 147,473.00 14,715.00
$162,188.00
Remove & Re-stripe in Added Area in Red 1-LS

MATERIAL

EQUIPMENT RENT

DUMP FEES

Page 1 of 1 ends

A-2 of 7
14,715.00 -
Sub Total Tax
Sub Total Tax
Sub Total Tax
14,715.00

SUBCONTRACTOR TOTAL
AMOUNT 00/o

MATERIAL TOTAL
AMOUNT 00/o

EQUIPMENT RENT TOTAL
AMOUNT 00/o

DUMP FEE TOTAL

SUBTOTAL I
15% Mark up
5% Mark up (Subs)
1%-Bond

GRAND TOTAL
TOTAL
$0.00
TOTAL
$0.00
TOTAL
$0.00
$162,188.00!
$0.00
$8,109.40
$1,702.97
$172,000.37)
To:

Address:
~~~, ~ 1

ALL AMERICAN
-ASPHALT-
T.E. Roberts Inc
306 W. Katella Ave, Unit B
Orange, CA 92867

ALL AMERICAN ASPHALT

ALL AMERICAN AGGREGATES

ENGINEERING - CONTRACTORS-ASPHALT PAVING
P.O. BOX 2229. CORONA. CA 92878-2229
ST ATE CONTRACTORS LICENSE #267073-A DIR# I 00000 I OS I Contact:

Phone: 7146690072
Fax: 7142000241
Project Name: EXTRA WORK CROWN VALLEY PAR'lmAY Bid Number:

Project Location: CITY OF LAGUNA NIGUEL
Item#
1 2
Item Description

FURNISH AND PLACE CRACK FILL / REAS SLURRY

REMOVE AND RESTRIPE IN ADDED AREA IN RED
Bid Date:

Estimated Quantity Unit
165,700.00 SF

1.00 LS
Unit Price
$0.89
$14,715.00
'
Total Price
$147,473.00
$14,715.00
Total Bid Price: $162,188.00 = =========,e:::==
Notes:
• PRICE INCLUDES:

1. SAME MOVE AS CONTRACT WORK

2. LABOR, EQUIPTMENT AND MATERIAL

3. TRAFFIC CONTROL PER WATCH MANUAL
*WATER TO BE PROVIDED TO AN ONSITE SOURCE PROVIDED BY OTHERS EXCLUDES: CONCRETE WORK, ENGINEERING, TESTING, PERMITS, INSPECTIONS FEES, RUBBERIZED ASPHALT, ASPHALT REINFORONG

FABRIC, ADJUSTING UTILITES, GRADING, ROCK BASE, TRAFFIC LOOPS, WATER, PRIME COAT, FOG SEAL, SEAL COAT, SURVEY, SIGNAGE,

BOND, POSTING OF NO PARKING OR NOTIFICATION OF RESIDENTS, SWPPP, LAYOUT, TRAFFIC CONTROL PLANS, REDWOOO HEADER,

RAILROAD PERMIT, HAZARDOUS WASTE REMOVALS, ANY PROJECT LABOR AGREEMENTS, OCIP INSURANCE, COLDMIX REMOVAL OR ANY OTHER WORK NOT LISTED ABOVE.

NOTE: ALL LIMITS TO BE PAINTED OUT BY OTHERS PRIOR TO ALL AMERICAN ASPHALT DOING WORK.

P.O. MUST BE ISSUED WTTHIN 30 DAYS FOR QUOTE TO BE VALID.

PRICE MAY VARY DEPENDING ON ACTUAL QUANTITIES AND SCOPE OF WORK ACCEPTED:

The above prices, specifications and conditions are satisfactory and hereby accepted.

Buyer:
- - -------- - - ---- ---
5 i gnat u re:

CONFIRMED:

All American Asphalt
Authorized Signature:
---- ------- ------ ---- ------ ---
Date of Acceptance: Estimator: LOTH, BOB
---- ---- ------ - (951) 736-7600 [email protected] 4/17/2025 3:46:30 PM Page 1 or 1
A-3 of 7
i
~
t
1,1 LEGEND
1~-LIMITS OF SLURRY SEAL (REAS)
1 !
0 I .,
! I l
- ~M~~~~~~i:t~ ~ee2~~~~Al AC

DANA POINT - RUBBERIZED
□ UTIUTY POTHOLE
4' X 4' GRIND AND CAP
~
~'i ~
"'I!)
g~
~ it
'inf
11,1 a.

Z?
~m
01/'J
~ -:a
1, THE CONT ACTOR SHALL RESTORE

EXISTING STRIPING ON NEW PAVEMENT

SECTIONS , UNLESS OTHERWISE NOTED

ON THE PLANS THE CONTRACTOR

SHALL BE RESPONSIBLE FOR

SUBMITTING STRIPING PLANS TO EACH

CITY FOR APPROVAL AS PART OF THEIR

ENCROACHMENT PERMIT

APPLICATIONS

PACIFIC ISLAND DRIVE

CAMINO DEL AVION

APPROVED BY

5.900
~
uiio 29,500
" I
~
I 21.eoo
!UCO
~
L 19,100
H l.Q,400
N 23,,UO
0 J 0,050
p .U,100
0 l ,'300
M 11,GSQ
s 0,000
JOTAL 29~.100 -
.:iiL\l!il!,Ulfl,l l"OOJDQ!(f\ JlfQl4l])
t •~:A~ :6: 7~0•S: • • • • • ~ • j
Ctly ol Laguna, N,ouel
lo u,imbu rs~ MN\f/0
0 ~~ t--~
No
~ CJ
CJ) s:

Wo
~w
_J w
ICJ)
~
::;;
:a llfl tct
~l[. 1~ --
_...,..,
2013 005
20,s oos
2019 0:37
8 ' " "'''"""o" ...., .. ,, ";;;,, - moulton_niguel RoDNEys,-.ooos Rcee:mo DATE GRINDANDCAP ~ _ water district DIRECTOROFEN GINEERING PAVEMENT LIMITS A-4 of7 ., """"
PLANS PREPAR.EO BY· I r■n:1 TETRA TECH ,nn
I

JJ I CROWN VALLEY PIPELINES
~ 11:,/ REPLACEMENT
C-140
~
c5
'"'c --z.
:::i
C.._)
Cl
C:i
C:i li.J
~
ct
Cl
l,__
< Cl
C.._)
~
~.
~
~
;
~
~ . I
~
i
~
i: . I
3 ~
"
i'
t a
I
!l
0 ~
;,
~
"
0 q
8 + 0 ,._..,.

N'
.,:U
tii ~ wo
~w
--'W
Icn
~
::;;
1,£UCij
~
._.,,0Jr...tt
~ LIMITS OF SLURRY SEAL(REAS) □ UTILllY POTHOLE
4' X 4' GRIND AND CAP
- t1m,~M!:.'.~~ ~:~~iNALAC
OANA F'OM • RUB8eRIZED
PLANS PAEPAA~D 11'1
("II:) TETRA TECH
"~""~ "'-.a..sco
IMU, C> 92&14
I>,.._,, ~~)Nl!l,!,Of)I') "'•!.t" ' ~)Ml/1.5'1 !0
""'"'

APPROVED BY
moulton niguell ROONEvs wooos-- R:c1n,>1JO DATE
water district DIRECTOR OF ENGINEERING
A-5 of 7

1. THE CONTACTOR SHALL RESTORE EXISTING STRIPING ON NEW PAVEMENT SECTIONS, UNLESS OTHERWISE NOTED ON THE PLJ\NS,

THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING
STRIPING PLJ\NS TO EACH CITY FOR APPROVAL AS PART OF THEIR ENCROACH(~!;I.l'E;lil~.1'LUTJCl.l$.
15:,.
&

CROWN VALLEY PIPELINES

REPLACEMENT

GRIND AND CAP

PAVEMENT LIMITS
0 q
0 ~ti: g: w
N--'
~~ Ill__.
w UJ ;z a:,
::;w
:i:: UJ
· ·@ - 0(1)
=~~]~
~
0 ~N
<'><t
"'~ N '
<( u
I- (!)
en:;:;
Wo
~w --'w Icn
~
• :,it ., .,.

PROJECTh'O
2013 005
2015 006
2019 037
OIIIA'MII0..0
C-141
"'
~
~
~
(__)
C)
C)
s
~ Q::
~ < C)
(__)
Al'ffllOAll
LEGEND
~ LIMITS OF SLURRY SEAL(REAS)
-
LIMITS OF 2" GRIND AND 2" CAP

LAGUNA NIGUEL - CONVENTIONAL AC

DANA POINT - RUBBERIZED
~SPR! P,!J!!i28Y
I "II:) TETRA TECH
□

UTILITY POTHOLE
4' X 4' GRIND AND CAP
r·-·,
I ' , ___ ,.1

LIMITS OF SLURRY SEAL (REAS)

CLN TO REIMBURSE MNWD
'l'l'l APPROVED BY
--- maulton_ni~ ROONEYS,V.0005 R.C E 6l130
water d1str1ct DIRECTOR OF ENGINEERING
A-6 of?
D,\TE
NOTES TO CONTRACTOR:

PASEO DEL NIGUEL
1, THE CONTACTOR SHALL RESTORE EXISTING STRIPING ON NEW

PAVEMENT SECTIONS, UNLESS OTHERWISE NOTED ON THE PLANS

THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING

STRIPING PLANS TO EACH CITY FOR APPROVAL AS PART OF THEIR ENCROACHM.lal'Jl.l'laR'-IILN'ElJCl\t
~
&,, CROWN VALLEY PIPELINES
11::,. REPLACEMENT

GRIND AND CAP

PAVEMENT LIMITS
•~10
2013 005
2015 006
~019 037
OlAWl4IIO
C-142
.,.
2::1
~
~
::::i
(_)
C)
c:i
E:l
~
c2 < C)
(_)
I
Q
i
fl
I I l I LEGEND
~ ~ LIMITS OF SLURRY SEALIREASJ □
i -
LIMITSOF'Z'GRINDAND2''CAP

LAGUNA NIGUEL- CONVENTIONAL AC

C DANA POINT - RUBBERIZED

UTILITY POTHOLE
4' X 4' GRIND ANO CAP
r·-·,
I ' ,_._,.,
LIM fJ!, 0, l!URRY SEAL (REAS)
CLN T011'tlt,t 8URSE MNWD
• ~ 0 ~
2013 005
2015 006
201903 7
1 .,,. - -~- .. --..... ~~=.. •= ,,.. PLANS PREPARED BY ,Nn APPROVED BY: CROWN VALLEY PIPELINES i .. ~ [ '11: I TETRA TECH I I ! REPLACEMENT
• - --- nlguel GRIND AND CAP ,- I ~ ,::;';!,, ,,,,._.._.__._..,.. moultori . ROONEYS v.ooos RCE.63130 DATE PAVEMENT LIMITS C-143 Ii REv cEscR1PtlON ....a °"T• . ~ .c.u 1t1~ water district 01RecroR OF ENGINEERING or ac1tt f Jl'r,:,,e• l;l·•t",.'l:'<I») ,.., --»,t..""IIUl•n ...........

A A-7 of 7 ' ..... _ .,,.,._ ...... _ _ ...... ..,.,_ _.,. _ .... _ ~
t5
?s
(,__)
C)
c:i
G
~
C)
~
C)
(,__)

← All documents from this meeting