02550100
G.D.
G.D. G.D.
K.O.
G.D.K.O.
LAKE ELSINORE OUTLET CHANNEL
C H A N E Y S T R E E T
BIRCH ST
G.D.
G.D.
G.D.G.D.G.D.G.D.
G.D.K.O.
G.D.K.O.G.D.
PAR 7
PAR 9
PAR 5
PAR 6
PAR 8
PAR 7
PAR 9
PAR 5
PAR 6
PAR 8
BUILDING M
BUILDING NBUILDING P
BUILDING Q
BUILDING R
BUILDING S
44 4 4 4
4 4
4 4
4 4 4
4 13
13 13
13 3
3 3
3 3
3 33
3 3
33 3 3 3 3
3 3
3 13555 5 513
5 5 2,000SF OFFICE AREA
2,000SF OFFICE AREA
2,000SF OFFICE AREA
1,000SF OFFICE AREA1,000SF OFFICE AREA
2,000SF OFFICE AREA
1 1 1
1 1
1 1
1 1
1 166
6 6
2 2
22 2
2 7
7 7
77 7
1011
12 13
15 14
SET BACKS:CHANEY STREET:
ADA ACCESSIBLE PARKINGAS PER STATE STANDARDSGRADE DOOR (12' X 14') & (12'X12')OFFICE12' X 18' WITH 2' O.H.(VAN)9' X 18' WITH 2' O.H.A.D.A. (HANDICAP) STALLS -9' X 16' STANDARD PARKING STALL -PARKING STALL SIZES:
GENERAL PLAN DESIGNATION:
G.D.GRAPHIC LEGENDSHEET DESCRIPTION:A1MASTER PLAN & PROJECT DATAA2ENLARGED SITE PLANA3FLOOR PLAN - BUILDINGS 10 & 11 PROJECT TEAM:OCCUPANCY CLASSIFICATION:ZONING:
LEGAL DESCRIPTION
A4ROOF PLAN - BUILDINGS 10 &11 A8FLOOR PLAN - BUILDING 15A9ROOF PLAN - BUILDING 15A10.1COLOR ELEVATIONS - BUILDINGS 10 & 11A11ELEVATIONS - BUILDING 14A12.1A13A13.1 A7FLOOR PLAN - BUILDING 14A10ELEVATIONS - BUILDINGS 10 & 11A12ELEVATIONS - BUILDING 15 A5FLOOR PLAN/ROOF PLAN - BUILDINGS 12 & 13A6ROOF PLAN - BUILDING 14 A14SITE F.A.R:- 149,500 SF (39.0%)BUILDINGS:
- SEE LANDSCAPE PLAN
LANDSCAPE AREA:LAND AREA:
382,698 SF (8.78 AC.)
TOTAL GROSS LAND AREA:
ELEVATIONS - BUILDINGS 12 & 13COLOR ELEVATIONS - BUILDING 14COLOR ELEVATIONS - BUILDING 15COLOR AND MATERIAL BOARDPEDESTRIAN AND A.D.A. ACCESSA15 UTILITY PURVEYORS:CONCEPTUAL LANDSCAPE PLANL1
A11.1COLOR ELEVATIONS - BUILDINGS 12 & 13SITE COVERAGE:- 141,500 SFBUILDINGS:VICINITY MAP NOT TO SCALE
SITE DATA TABLE
1KEY NOTES:ASPHALT PAVING2CONCRETE PAVING3LANDSCAPE AREA4PER CITY STD. PARKING STALL 9'X18' 67TRASH ENCLOSURE5A.D.A. PARKING 9' X 18' & 12' X 18'- STATE STD.A.D.A. PEDESTRIAN PATH OF TRAVEL aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CACONCEPTUAL MASTER PLAN07-07-2021SHEET A1 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/26/2021 @ 4:26 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg
THE SITE
INTERSTATE 15CHANEY STBIRCH ST3RD ST74
LAKE ELSINORE OUTLET CHANNEL
02550100
G.D.
G.D. G.D.
K.O.
G.D.K.O.
LAKE ELSINORE OUTLET CHANNEL
C H A N E Y S T R E E T
BIRCH ST
G.D.
G.D.
G.D.G.D.G.D.
G.D.
G.D.K.O.
G.D.K.O.
G.D.
PAR 5
PAR 6
PAR 5
PAR 6
BUILDING MBUILDING Q
BUILDING R
4 4
4 44
4 4
4 4
4 4 4
4 13
13 13
13 3
3 3
3 3
3 3
3 3
3 3
3 3 3 3
33 3
3 13
55 5 5 513 5
5 2,000SF OFFICE AREA
2,000SF OFFICE AREA
2,000SF OFFICE AREA
1,000SF OFFICE AREA1,000SF OFFICE AREA
2,000SF OFFICE AREA
1 1 1
1 1
1 1
1 1
1 16
6 6 6
2 2
2 2
2 2
7 7
7 777
1011
12 13
15 14
SITE DATA TABLE
1KEY NOTES:ASPHALT PAVING2CONCRETE PAVING3LANDSCAPE AREA4PER CITY STD. PARKING STALL 9'X18' 67TRASH ENCLOSURE5A.D.A. PARKING 9' X 18' & 12' X 18'- STATE STD.A.D.A. PEDESTRIAN PATH OF TRAVELMANUFACTURER SERIES TYPE FINISH GLASS EXT/INT NOTE1) ARCADIA AFG-451 2"X4 12" SYSTEM CLEAR ANODIZED 1" EXT. OFFSET GLAZED, CANNED1) ARCADIA AS212 NARROW DOOR CLEAR ANODIZED 1" EXT.MATERIAL LISTTYPE SIZE DESCRIPTION1) GL1 1" 14" SOLAR COOL SOLAR BLUE GLASS TYPES TO BE:2) GL1T 1" 14" SOLAR COOL SOLAR BLUE TEMPERED3) GL2 1" 14" SOLAR COOL SOLAR BLUE OVER CLEAR 4) GL2T 1" 14" SOLAR COOL SOLAR BLUE OVER CLEAR TEMPERED aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/13/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAENLARGED SITE PLAN07-13-2021SHEET A2 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/26/2021 @ 4:32 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg BA: 32,000SF BUILDING 10
BA: 20,500SF BUILDING 11
155'-0"
218'-0"
2,000SF OFFICE AREA
2,000SF OFFICE AREA
48'-0" 26'-0"144'-0"
64'-0"91'-0"
104'-0"
43'-0"61'-0"
200'-0"167'-0"33'-0"
155'-0"104'-0"
24'-0"105'-0"26'-0"26'-0"78'-0"
G.D. G.D.
G.D.G.D.
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAFLOOR PLAN- BLDG 10&1107-07-2021SHEET A3 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY ©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 3:26 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg
KEY PLANNOT TO SCALE
10 11
1213
14 15
01'4'8'16'21'-4" 2'332"
BUILDING 10
BUILDING 11
17'-0"
17'-0"
17'-0"
17'-0"
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAROOF PLAN- BLDG 10&1107-07-2021SHEET A4 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 5:10 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg
KEY PLANNOT TO SCALE
1011
1213
14 15
01'4'8'16'21'-4"2'332"
BA: 12,000SF BUILDING 12 and 13
88'-0"
138'-0"
1,000SF OFFICE AREA
138'-0"26'-0" 112'-0"
88'-0"62'-0" 26'-0"
28'-0"1'-0"22'-0"1'-0"
G.D.K.O.
G.D.
BUILDING 12 and 135'-0"
5'-0"
17'-0"17'-0"
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAFLOOR PLAN & ROOF PLAN - BLDG 12 & 1307-07-2021SHEET A5 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 5:11 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg BUILDINGS 12 & 13 ARE SIMILARKEY PLANNOT TO SCALE
1011
1213
14 15
01'4'8'16'21'-4"2'332"
BA 41,000SF BUILDING 14
2,000SF OFFICE AREA
229'-0"
66'-6" 162'-6"
190'-0"
229'-0"
26'-0" 203'-0"
190'-0"
46'-0"144'-0"
26'-0"
25'-0"50'-0" 1'-0"
1'-0"
G.D.K.O.G.D.
G.D.
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAFLOOR PLAN- BLDG 1407-07-2021SHEET A6 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY ©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 3:34 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg
KEY PLANNOT TO SCALE
10 11
1213
14 15
01'4'8'16'21'-4" 2'332"
BUILDING 14
17'-0"
17'-0"
5'-0"
5'-0"
5'-0"
5'-0"
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAROOF PLAN- BLDG 1407-07-2021SHEET A7 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 5:12 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg
KEY PLANNOT TO SCALE
1011
1213
14 15
01'4'8'16'21'-4"2'332"
BA 30,500SF BUILDING 15
2,000SF OFFICE AREA
248'-0"
129'-0"
45'-0" 84'-0"
139'-0"
113'-0" 26'-0"
248'-0"
28'-0"
26'-0" 81'-0" 95'-0"
1'-0"
1'-0"
46'-0"
G.D.K.O.
G.D.
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAFLOOR PLAN- BLDG 1507-07-2021SHEET A8 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY ©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 3:35 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg
KEY PLANNOT TO SCALE
10 11
1213
14 15
01'4'8'16'21'-4" 2'332"
BUILDING 15
17'-0"
17'-0"
5'-0"
5'-0"
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAROOF PLAN- BLDG 1507-07-2021SHEET A9 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 5:12 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg
KEY PLANNOT TO SCALE
1011
1213
14 15
01'4'8'16'21'-4"2'332"
PAINTED CONCRETE CORNICECONCRETE TILT-UPPANELWITH REVEALSMETAL AWNING (SUNSHADE DEVICE)MEDIUM REFLECTIVE GLASS INCLEAR ANODIZED ALUMINUMMULLION SYSTEM. 14'-0" F.F.26'-0" CLEAR HEIGHT9'-0"
35'-0"
CLERESTORY @WAREHOUSEPAINTED ACCENT INSET
39'-0"
14'-0" F.F.26'-0" CLEAR HEIGHT9'-0"
35'-0"39'-0"
26'-0" CLEAR HEIGHT35'-0"
35'-0"39'-0"26'-0" CLEAR HEIGHT
WEST ELEVATION
SOUTH ELEVATION
EAST ELEVATION
NORTH ELEVATION
BUILDING 10BUILDING 11
BUILDING 11BUILDING 10
BUILDING 11
BUILDING 10
CONCRETE TILT-UPPANELWITH REVEALS
PAINTED ACCENT INSETCLERESTORY @WAREHOUSEMETAL DOORDOCK DOOR
GRADE DOORMETAL DOORCONCRETE TILT-UPPANELWITH REVEALS
CONCRETE TILT-UPPANELWITH REVEALS
CLERESTORY @WAREHOUSEMETAL DOOR DOCK DOOR
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAELEVATIONS- BLDG 10&1107-07-2021SHEET A10 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY ©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 3:36 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg
KEY PLANNOT TO SCALE
10 11
1213
14 15
01'4'8'16'21'-4" 2'332"
SOUTH ELEVATION
EAST ELEVATION
NORTH ELEVATION
24'-0"
16'-0" CLEAR HEIGHT9'-0"
24'-0"27'-0"
24'-0"27'-0"
PAINTED CONCRETE CORNICECONCRETE TILT-UPPANELWITH REVEALSMETAL AWNING (SUNSHADE DEVICE)MEDIUM REFLECTIVE GLASS INCLEAR ANODIZED ALUMINUMMULLION SYSTEM. 24'-0"26'-0"
METAL DOOR
CONCRETE TILT-UPPANELWITH REVEALS
PAINTED ACCENT INSET
PAINTED ACCENT INSETMETAL DOOR
METAL DOORPAINTED ACCENT INSET
GRADE DOORMETAL DOORCONCRETE TILT-UPPANELWITH REVEALS
CONCRETE TILT-UPPANELWITH REVEALS
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAELEVATIONS- BLDG 12&1307-07-2021SHEET A11 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY ©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/22/2021 @ 3:36 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg BLDG 12&13 ARE SIMILARKEY PLANNOT TO SCALE
10 11
1213
14 15
01'4'8'16'21'-4" 2'332"
WEST ELEVATION
SOUTH ELEVATION
EAST ELEVATION( CHANEY ST. ELEVATION)
NORTH ELEVATION
PAINTED CONCRETE CORNICECONCRETE TILT-UPPANELWITH REVEALSMETAL AWNING (SUNSHADE DEVICE)MEDIUM REFLECTIVE GLASS INCLEAR ANODIZED ALUMINUMMULLION SYSTEM.
CLERESTORY @WAREHOUSEPAINTED ACCENT INSET
26'-0" CLEAR HEIGHT35'-0" 14'-0" F.F.26'-0" CLEAR HEIGHT9'-0"35'-0"39'-0"26'-0" CLEAR HEIGHT35'-0" 26'-0" CLEAR HEIGHT35'-0"37'-0"
METAL DOOR
GRADE DOORCLERESTORY @WAREHOUSEMETAL DOOR
CONCRETE TILT-UPPANELWITH REVEALS
CLERESTORY @WAREHOUSEPAINTED ACCENT INSET
CONCRETE TILT-UPPANELWITH REVEALS
MEDIUM REFLECTIVE GLASS INCLEAR ANODIZED ALUMINUMMULLION SYSTEM.
METAL DOOR
CONCRETE TILT-UPPANELWITH REVEALS
CLERESTORY @WAREHOUSEMETAL DOORPAINTED ACCENT INSET
K.O.PANEL
DOCK DOOR
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAELEVATIONS- BLDG 1407-07-2021SHEET A12 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/26/2021 @ 11:07 AMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg 1011
1213
14 15
KEY PLANNOT TO SCALE01'4'8'16'21'-4"2'332"
WEST ELEVATION
SOUTH ELEVATION
EAST ELEVATION( CHANEY ST. ELEVATION)
NORTH ELEVATION
35'-0"37'-0"
14'-0" F.F.26'-0" CLEAR HEIGHT9'-0"35'-0"39'-0"
26'-0" CLEAR HEIGHT35'-0"
35'-0"
PAINTED CONCRETE CORNICECONCRETE TILT-UPPANELWITH REVEALSMETAL AWNING (SUNSHADE DEVICE)MEDIUM REFLECTIVE GLASS INCLEAR ANODIZED ALUMINUMMULLION SYSTEM.
CLERESTORY @WAREHOUSEPAINTED ACCENT INSETMETAL DOOR
CONCRETE TILT-UPPANELWITH REVEALS
MEDIUM REFLECTIVE GLASS INCLEAR ANODIZED ALUMINUMMULLION SYSTEM.
CLERESTORY @WAREHOUSEMETAL DOOR
GRADE DOORMETAL DOORCLERESTORY @WAREHOUSE CONCRETE TILT-UPPANELWITH REVEALS
CONCRETE TILT-UPPANELWITH REVEALS
K.O.PANEL
DOCK DOOR
LAKE ELSINORE OUTLET CHANNEL
CHANEY STREET
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/07/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CAELEVATIONS- BLDG 1507-07-2021SHEET A13 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/26/2021 @ 11:08 AMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg 1011
1213
14 15
KEY PLANNOT TO SCALE01'4'8'16'21'-4"2'332"
02550100
G.D.
G.D. G.D.
K.O.
G.D.K.O.
LAKE ELSINORE OUTLET CHANNEL
C H A N E Y S T R E E T
BIRCH ST
G.D.
G.D.
G.D.G.D.G.D.
G.D.
G.D.K.O.
G.D.K.O.
G.D.
PAR 5
PAR 6
PAR 5
PAR 6
BUILDING MBUILDING Q
BUILDING R
4 4
4 44
4 4
4 4
4 4 4
4 13
13 13
13 3
3 3
3 3
3 3
3 3
3 3
3 3 3 3
33 3
3 13
55 5 5 513 5
5 2,000SF OFFICE AREA
2,000SF OFFICE AREA
2,000SF OFFICE AREA
1,000SF OFFICE AREA1,000SF OFFICE AREA
2,000SF OFFICE AREA
1 1 1
1 1
1 1
1 1
1 16
6 6 6
2 2
2 2
2 2
7 7
7 777
1011
12 13
15 14
aoarchitects.com714 / 639-9860144 North Orange Street, Orange, California 92866Date: 07/13/2021Job No.2021-235Scale Fairway | Commercial PartnersFAIRWAY BUSINESS PARK CITY OF LAKE ELSINORE, CA A.D.A. PEDESTRIAN ACCESS PLAN07-13-2021SHEET A15 DISCLAIMER:ALL INFORMATION CONTAINED HEREIN MAY BE SUBJECTTO CHANGE PENDING OWNER AND OR AGENCY REVIEWAND IS FOR INFORMATION ONLY©2019 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.sheet plotted:drawing file name:Jul/26/2021 @ 3:42 PMp:\2021-235 fairway - elsinore\design\site design\2021-235 fairway phase 3.dwg LEGEND:A.D.A. PEDESTRIAN PATH
**
**
**
LAKE ELSINORE OUTLET CHANNEL
BUILDING 10
CHANEY STREET
R.O.W.
P.L.
2 BUILDING 11
BUILDING 14
BUILDING 15BUILDING 13BUILDING 12BIRCH ST.
P.L.
P.L.
P.L.
P.L.
P.L.
P.L.
R.O.W.
R.O.W.
P.L.
P.L.
P.L.
P.L.
11 1
1 1
2 2 2
2 3
3 4
4 11
4 4
5 5
5 5
5 7
7 7
9 9
6 6
6 6
10 10
10 10
10 108
8 8
8 86 6
8 8
8 B
B AA
A
C
C
EXISTINGPHASE II SITE
EXISTINGLANDSCAPE
EXISTINGLANDSCAPE
EXISTINGDATE PALMS TREES SYMBOL TREE NAMEQTY.WUCOLSNEW STREET TREE ALONG CHANEY STREETPLATANUS ACERFOLIA 'BLOODGOOD', LONDON PLANE TREE24" BOX SIE.13M TYP. FOCAL TREEQUERCUS AGRIFOLIA, COAST LIVE OAK36" BOX SIZE.7L PARKING LOT CANOPY TREERHUS LANCEA, AFRICAN SUMAC24" BOX SIZE.38L FLOWERING ACCENT TREE AT BUILDING ENTRIESCERCIS OCCIDENTALIS, WESTERN REDBUD24" BOX SIZE.10L TYP. BACKDROP STREET FRONTAGE TREEGEIJERA PARVIFLORA, AUSTRALIAN WILLOW24" BOX SIZE.13M VERTICAL TREE AGAINST BUILDINGBRACHYCHITON POPULNEUS, BOTTLE TREE &PODOCARPUS GRACILIOR 'COLUMNAR', FERN PINE15 GAL. MIN. SIZE.58L FLOWERING ENTRY TREES AT DRIVEWAYSCERCIDIUM X 'DESERT MUSEUM', PALO VERDE36" BOX SIZE.7L PROPERTY LINE TREEQUERCUS ILEX, HOLLY OAK15 GAL. SIZE39L CHITALPA X TASHKENTENSIS, CHITALPA24" BOX SIZE.16L PHOENIX DACTYLIFERA, DATE PALM20' BTH.4L
PLANTING LEGEND
SHRUBS & GROUND COVERS (SHALL BE SELECTED FROM THEFOLLOWING): SYMBOL NAMEWUCOLSAGAVE 'RAY OF LIGHT', RAY OF LIGHT AGAVE1 GAL. SIZE @ 36" O.C.L ALOE STRIATA, CORAL ALOE1 GAL. SIZE @ 24" O.C.L CAREX COMOSA, LONGHAIR SEDGE1 GAL. SIZE @ 36" O.C.M CAREX PANSA, CALIFORNIA MEADOW SEDGE4' POTS @ 18' O.C.M HELICTOTRICHON SEMPERVIRENS, BLUE OAT GRASS5 GAL. SIZE @ 36" O.C.L JUNCUS EFFUSUS, COMMON RUSH1 GAL. SIZE @ 36" O.C.L LAURUS NOBILIS 'SARATOGA', SWEET BAY15 GAL. SIZE. COLUMNARL MACFADYENA UNGUIS-CATI, CAT'S CLAW VINE5 GAL. SIZEL MUHLENBERGIA RIGENS, DEER GRASS5 GAL. SIZE @ 60" O.C.L PANICUM V. 'ROTSTRAHLBUSCH', RED SWITCH GRASS1 GAL. SIZE @ 36" O.C.L PEROVSKIA ATRIPLICIFOLIA, RUSSIAN SAGE5 GAL. SIZE @ 48" O.C.L SALVIA LEUCANTHA, MEXICAN SAGE5 GAL. SIZE @ 36" O.C.L SALVIA LEMMONII, LEMMON'S SAGE5 GAL. SIZE @ 42" O.C.L SENECIO SERPENS, BLUE CHALK STICKS1 GAL. SIZE @ 12" O.C.L NOTE: APPLY A 3" MIN. LAYER OF MULCH TOP DRESSING WITHIN ALL PLANTING AREAS. A SAMPLE IS REQUIREDPRIOR TO APPLICATION.DESIGN KEY NOTES:1.TYP. VERTICAL TREE AGAINST BUILDINGPER LEGEND.2.TYP. PARKING LOT CANOPY TREE PERLEGEND.3.NEW STREET TREE PER LEGEND.4.FLOWERING ACCENT TREE PER LEGEND.5.FOUNDATION SHRUBS ALONG BUILDINGPER LEGEND.6.ALL TREES 4' OR LESS TO CURB,WALKWAY OR WALL SHALL BE INSTALLEDWITH DEEP ROOT BARRIER PANELS. 18"MIN. DEPTH X 10' WIDE PANEL.
7.ALLOW FOR 24" CLEARANCE FROM BACKOF CURB TO SHRUB. PROVIDE MULCHBETWEEN BACK OF CURB AND SHRUB.8.LAYERED DROUGHT TOLERANT GROUNDCOVER PER LEGEND.9.ENHANCED VEHICULAR PAVING ATPROJECT ENTRY DRIVES. COLORED CONC.10.TYP. CONCRETE ENTRY PAVING AT BLDG.ENTRIES. COLORED CONCRETE WITHSCORE LINES.11.ACCENT PALM AT ENTRY DRIVE PERLEGEND.
A.TRASH ENCLOSURE PER ARCHITECTURALPLANS.B.PROPOSED SIDEWALK PER CIVIL PLANS.C.STREET LIGHTS PER ELEC. PLANS.
REFRENCE KEY NOTES:
SCOTT PETERSON LANDSCAPE ARCHITECT, INC.2883 VIA RANCHEROS WAYFALLBROOK, CA 92028PH: 760-842-8993SCALE: 1" = 30'-0"030'60'90' NORTH DATE: 7-28-21 FAIRWAY BUSINESS PARK (PHASE II)CITY OF LAKE ELSINORE, CACONCEPTUAL LANDSCAPE PLANL-1 WUCOLS PLANT FACTORTHIS PROJECT IS LOCATED IN'WUCOLS' REGION '4-SOUTH INLAND'.H = HIGH WATER NEEDSM = MODERATE WATER NEEDSL = LOW WATER NEEDSVL= VERY LOW WATER NEEDS ·SLOPES GREATER THAN 3:1 SHALL BE STABILIZED WITH EROSION CONTROL GROUNDCOVER PER LEGEND, AND MULCH MATERIAL WITH 'BINDER' MATERIAL SHALL BEAPPLIED FOR EROSION CONTROL.·ROCK RIP-RAP MATERIAL SHALL BE INSTALLED WHERE DRAIN LINES CONNECT TOINFILTRATION AREAS.·ALL UTILITY EQUIPMENT SUCH AS BACKFLOW UNITS, FIRE DETECTOR CHECKS, FIRECHECK VALVE, AND AIRCONDITIONING UNITS WILL BE SCREENED WITH EVERGREEN PLANT MATERIAL ONCEFINAL LOCATIONS HAVEBEEN DETERMINED.
GENERAL NOTES:THIS IS A CONCEPTUAL LANDSCAPEPLAN. IT IS BASED ON PRELIMINARYINFORMATION WHICH IS NOT FULLYVERIFIED AND MAY BE INCOMPLETE. ITIS MEANT AS A COMPARATIVE AID INEXAMINING ALTERNATE DEVELOPMENTSTRATEGIES AND ANY QUANTITIESINDICATED ARE SUBJECT TO REVISIONAS MORE RELIABLE INFORMATIONBECOMES AVAILABLE.
IRRIGATION NOTE:THE PROJECT WILL BE EQUIPPED WITH A LOWFLOW IRRIGATION SYSTEM CONSISTING OF ETWEATHER BASED SMART CONTROLLER, LOWFLOW ROTORS, BUBBLER AND/ OR DRIPSYSTEMS USED THROUGHOUT. THE IRRIGATIONWATER EFFICIENCY WILL MEET OR SURPASS THECURRENT STATE MANDATED AB-1881 WATERORDINANCE.
CONCEPTUAL PLAN NOTE:
LANDSCAPE DATA:
TOTAL SITE AREA = APPROX. 382,800 S.F.
TOTAL LANDSCAPE AREA = 66,554 S.F. (APPROX. 17% OF SITE) I)