CITY OF LAKE ELSINORE
130 S. MAIN STREET
LAKE ELSINORE, CA 92530
(951) 674-3124
PROJECT CHANGE ORDER CHANGE ORDER # 2
DATE: February 13, 2024
THIS CHANGE ORDER IS APPLICABLE TO:

CITY PROJECT #
PROJECT TITLE:
#Z40023
Asphalt Repairs, Slurry Seal & Striping
for 11 Park Parking Lots
CONTRACT AWARDED TO:

NPG, Inc.

DATE AWARDED: June 13, 2023
Authorized by: Jason Simpson
City Manager

TOTAL AMOUNT OF CONTRACT

PRIOR TO THIS CHANGE ORDER
$500,891.00 (inclusive of contingency)
CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES:

QUANTITIES INCREASED

ITEM QUANTITY UNIT UNIT PRICE EXTENSION
Lump Sum 1.00 $116,767.00 $116,767.00Mobilization Slurry Seal 2 coats Demolition Striping 2 coats of paint
Asphalt Repair Survey services, engineering
Concrete Work Grading
Crack Sealing 44.4 Ft. wheel stop & ADA

QUANTITIES DECREASED

ITEM QUANTITY UNIT PRICE EXTENSION
None
TOTAL $116,767.00

THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE
SUM OF $116,767.00
Change Order No. 2
Review by: Initials Date Approved by: Date
Assistant City Manager
Contractor
City Manager:

AUTHORIZATION FOR EXTRA WORK
CHANGE ORDER NO: 2 ----
Date Issued: December 18, 2023 I NPG Job No. 232340 NPG Estimator: Lou Ton Customer Name: City of Lake Elsinore Customer Job No: Customer P.O. #:

Contact Name: Chris Erickson Office Phone: 951-453-9463 Project Name: Lakepoint Park
Job Location: 420 East Lake Shore Drive Lake Elsinore, CA 92530 Furnish and Place Labor, Equipment, and Materials Necessary to Quantity Unit Price Complete the Following scope of work:

The changes are extra as follows:

1. Mobilization (not to exceed 3%) (same as contract) 1 LS

2. Demolition 1 LS

3. Asphalt Repair 1 LS

4. Concrete Work 1 LS

5. Crack Sealing (same as 7n ract)
St Cf--. i..,1,,·4 - ,./-,�c,f..J r;,(Qll)
1 LS

6. Slurry Seal 2 coats - « z._ooo 1 LS

7. Striping 2 coats of paint 1 LS

8. Survey services, engineering drawings & construction staking. 1 LS

9. Gading (exceed soil to be stock pile at City designated site). 1 LS 1 O. 44-4 ft. wheel stop & ADA signage to new locations. 1 LS This authorization must be signed prior to Amount of Contract $ NPG performing services. Upon signing this Amount of Previous Change Orders $ change order, customer agrees to pay authorized Amount of This Change Order #2 $ amount in full with no retention to be held. Subtotal Including All Change Orders $ Ljh,�
NPG Corporation Representative
Desiree Tapia, Human Resource Manager
Printed Name / Title
December 18, 2023
Date
Cu�mers Owners Representa'tf�
£ di: t& ,<!,4J, #11Prirhed Name 1e
1/n/2,02-4= Date '
Total
$0.00
$27,517.00
$25,700.00
$16,452.00
$0.00
$1,403.00
$750.00
$8,115.00
$30,680.00
$6,150.00
138,337.00

0.00 116,767.00
255,104.00
TERMS, CONDITIONS AND WARRANTIES OF AUTHORIZATION FOR ADDITIONAL WORK TO BE IN ACCORDANCE WITH STANDARDS AND SPECIFICATIONS. GENERAL CONDITIONS: Unless otherwise specified herein, NPG, Inc. specilically excludes from the performance of the service here quoted all: Traffic control, liabilities that may arise from job site. conditions outside lhe direct and exclusive control of NPG, Inc., surveying rnarklng, layout. saw culling, temporary patches. and job sile maintenance once our item of work is completed each workday. Upon completlon of the designated section of the work NPG, Inc. shall be rel ived of all liab!lity for the work and !he coniractor shall resume protection of the work, and insurance or indemnification provided by NPG, Inc. shall be limited to th s condition. NPG, Inc. shall not surrender any por1ion or percentage of extra work or force account mark-ups. The-terms of this quote shall be incorporated into the contract and NPG reserves the right to adjust any clerical or mathematical errors thal may be present in the pricing or specificalions .. Payment Terms: All invoices shall be paid upon completion of contracted work done by NPG, Inc. and no retention 10 be held. Price Is valid 30 days from dale issued.