ESTIMATE
RP Landscape & lrrigation [email protected]
275 SG St 909-889-9987
San Bernardino. CA 92410
City of Lake Elsinore
Bill to
City of Lake Elsinore
Finance Department
130 S Mdn Street
Lake Elsinore, CA 92530
Ship to
City of Lake Elsinore
Storm Stadium
Lake Elsinore, CA
Estimate details Job Site: Storm Stadium Dg & Rock
Estimate no.: 1064
Esti mate dale: 03 /26 /2024
# Date Product or service
1. Qty Rate Amount
$0.00
Here is the price to remove rock and mulch around the perimeter of the Storm Stadium and replace it with 4" of rock and DG. lnner 8' perimeter will be 3/8 rock, areas from rock to the sidewalk will be Red DG and areas from the sidewalk to the curb will be lnfield Mix DG.
All materials will be locally sourced. See Picture of color scheme.
All laterals will be capped at the valves minus valves watering perimeter for palms.
Labor
Total Materials & Labor
1 $148,822.16 $148.822.16
Total $148,822.16