WEST COAST QUOTE
Quote Nbr.: Q003585
)VTURF Order Date: 8/2/2024
Valid Until: 10/31/2024
WCT Sales Person: Anthony Pulizzano
PO BOX 4563 [email protected]
Palm Desert, CA, 92261-4563 Customer ID: LAKE050
Phone: 888-893-8873
www.westcoastturf.com Customer Reference #:
CA#688087, NV:#0048299, AZ:#ROC110478, CA DIR #1000009410 Payment Terms: NET 30 Tax Exempt #:
Installation: PW-NO Union-No
3/4" THICK
BANDERA/TAHOMA SAME PRICE
QUOTE CONTACT: PROJECT LOCATION: Primary Location
DIAMOND STADIUM GROUP, LLC - LAKE ELSINORE 500 DIAMOND DR STORM LAKE ELSINORE CA 92530-4457
500 DIAMOND DR
LAKE ELSINORE CA 92530-4457
MATT SIEGEL
Email: [email protected]
Phone 2: 951-423-8308
NO. ITEM QTY. VOM PRICE DISC. AMOUNT
T31-BRI: TAHOMA 31 BIG ROLL INSTALLED 92,000.0000 SQFT 1.1000 0% 101,200.00 NOTE: 3/4" THICK
See Condtions of Sale on final page of this quote. Quote Total: 101,200.00 Less Discount: 0.00
Tax Total: 0.00
Total (USD): 101,200.00
Conditions of Sale:
• Billed quantities for sod or stolons and installation services are based on amount ordered on delivery invoices.
• Field measurements or any other method for calculating billed amounts are not valid. • In no event will West Coast Turf be liable to anyone for special, incidental, consequential, indirect, or liquidated damages. This includes, but is not limited to, lost revenue or profits arising from and/or relating to any product or service provided by West Coast Turf, or the inabliity to provide said product or service. • WCT guarantees that sod will arrive weed/disease free. WCT needs to be notified within 24 hours of delivery if there is a problem. No further warranty on live product outside the care and control of West Coast Turf is offered or implied
• Contractor assumes responsibility for notifying us of Prevailing Wage and/or Union job status in order for us to know what wage rate to pay.
• All soil preparation and final grading must be completed prior to sod installation by customer. No grading or pre/post rolling will be provided.
• Quote is valid for 90 days from the stated Quote Date on Page 1. • Quote does not guarantee sod availability. A separate deposit, purchase order, or contract may be required to guarantee materials.
• If turf grass varieties requested are different than West Coast Turf varieties, a contract and a deposit will be required for a contract grow.
• Price quote based on full scope of work.
• West Coast Turf is not signatory to any Labor Unions. Installation jobs requiring Union labor will be contingent on Union acceptance of a single project agreement for West Coast Turf to perform installation on the Union project. Installation/Labor costs higher for PW/Union jobs, and those installed weekends and holidays.
• All payments by credit card for any project total amounts above $20,000 will incur a 3% processing fee. Check, ACH, or wire transfer is preferred.