3726320 3726350 3726380 3726410 3726440 3726470 3726500 3726530 3726560 3726590 3726320 3726350 3726380 3726410 3726440 3726470 3726500 3726530 3726560 3726590 469570 469600 469630 469660 469690 469720 469750 469780 469570 469600 469630 469660 469690 469720 469750 469780 33° 40' 44'' N
117° 19' 42'' W
33° 40' 44'' N
117° 19' 33'' W
33° 40' 34'' N
117° 19' 42'' W
33° 40' 34'' N
117° 19' 33'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,460 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Western Riverside Area, California
Survey Area Data: Version 16, Aug 30, 2023
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Mar 14, 2022—Mar 17, 2022
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Soil Map—Western Riverside Area, California
(Property Line)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
10/27/2023
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GdC Garretson gravelly very fine
sandy loam, 2 to 8 percent
slopes
0.0 0.0%
Wa Waukena loamy fine sand,
saline-alkali
1.6 100.0%
Totals for Area of Interest 1.6 100.0%
Soil Map—Western Riverside Area, California Property Line Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
10/27/2023
Fleming and Sons Concrete Yard Project Appendix B
City of Lake Elsinore Class 32 Exemption Checklist
Appendix B: VMT Screening Evaluation
DATE: November 2, 2023
TO: Alan Fleming, AF Properties, LLC
FROM: Alex So, Urban Crossroads, Inc.
JOB NO: 15715-01 VMT
FLEMING & SONS CONCRETE, INC. PUMPING TRUCK YARD
VEHICLE MILES TRAVELED (VMT) SCREENING EVALUATION
Urban Crossroads, Inc. is pleased to provide the following Vehicle Miles Traveled (VMT) Screening Evaluation for the proposed Fleming & Sons Concrete, Inc.
Pumping Truck Yard ( Project), which is located at south west corner of the intersection of West Minthorn and North Riley in the City of Lake Elsinore.
PROJECT OVERVIEW
It is our understanding that the Project is to consist of a concrete pumping truck parking yard, minor maintenance, and administrative office building (7,500 square feet). The approximately 1.6-acre property is currently vacant.
A preliminary site plan for the proposed Project is found in Attachment A.
PROJECT OPERATIONAL CHARATERISTICS
The Project would provide for parking and maintenance of 10-12 concrete pump semi-trucks on site. Each day most will leave the yard and return. Trucks that are not working receive needed light duty maintenance such as tires, pipes, hoses, check and maintain fluids, fix mirror or windshield, etc. to be ready for use the following day. No major repair work is done on-site. Typical operations include the trucks exiting the yard and going directly to different jobsites each day, meet with concrete mixing trucks at the site and concrete is poured from the concrete trucks through the pumps to place concrete at the jobsite. Trucks will be washed out and cleaned off-site before returning to the yard. Trucks will also be re-fueled off-site.
Sales and parts ordering personnel will work out of the administrative office.
Typical operations will occur Monday through Friday (with occasional weekend operations) from 4:00 AM to 6:00 PM. There will be a pproximately 10 -12 employees on the site at any given time.
BACKGROUND
The California Environmental Quality Act (CEQA) requires all lead agencies to adopt VMT as the measure for identifying transportation impacts for land use projects.
Approved
BB
11/14/2023
Alan Fleming, AF Properties, LLC
November 2, 2023
15715-01 VMT
To comply with CEQA, the City of Lake Elsinore adopted analytical procedures, screening tools, and impact thresholds for VMT, which are documented in the Traffic Impact Analysis Preparation Guide (Revised November 2022) (City Guidelines) (1).The City Guidelines were used to determine if the proposed Project can be screened from further VMT analysis.
VMT SCREENING
The City Guidelines provide details on appropriate screening criteria that can be used to identify when a proposed land use project is anticipated to result in a less than significant impact without conducting a more detailed project level analysis. To aid in the project -level VMT screening process, the City of Lake Elsinore utilizes the WRCOG VMT Screening Tool (Screening Tool). The web-based Screening Tool allows a user to select the Project’s parcel to determine if its location meets one or more of the land use screening criteria identified in the City Guidelines. The City of Lake Elsinore’s VMT screening steps as described within the City Guidelines are listed below and a land use project need only to meet one to result in a less than significant impact:
• Step 1: Transit Priority Area (TPA) Screening
• Step 2: Low VMT Area Screening
• Step 3: Project Type Screening
STEP 1: TPA SCREENING
Consistent with guidance identified in the City Guidelines, projects located within a Transit Priority Area (TPA) (i.e., within ½ mile of an existing “major transit stop”1 or an existing stop along a “high- quality transit corridor” 2) may be presumed to have a less than significant impact absent substantial evidence to the contrary.
However, the presumption may not be appropriate if a project:
• Has a Floor Area Ratio (FAR) of less than 0.75;
• Includes more parking for use by residents, customers, or employees of the project than required by the jurisdiction (if the jurisdiction requires the project to supply parking); • Is inconsistent with the applicable Sustainable Communities Strategy (as determined by the lead agency, with input from the Metropolitan Planning Organization); or • Replaces affordable residential units with a smaller number of moderate- or high-income residential units.
Based on the Screening Tool results, the Project is not located within a ½ mile of an existing major transit stop or an existing stop along a high-quality transit corridor. (See Attachment B) TPA Screening step is not met.
1 Pub. Resources Code, § 21064.3 (“‘Major transit stop’ means a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.”). 2 Pub. Resources Code, § 21155 (“For purposes of this section, a high-quality transit corridor means a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.”).
Alan Fleming, AF Properties, LLC
November 2, 2023
15715-01 VMT
STEP 2: LOW VMT AREA SCREENING
The City Guidelines state s that “ Residential and office projects located within a low VMT- generating area are presumed to have a less than significant impact absent substantial evidence to the contrary. In addition, other employment -related and mixed- use land use projects may qualify for the use of screening if the project can reasonably be expected to generate VMT per service population that is similar to the existing land uses in the low VMT area.” City Guidelines identifies low VMT generating traffic analysis zones as those that generate VMT per service population below the City of Lake Elsinore’s baseline3 VMT per service population.
The latest version of the Riverside County Transportation Model (RIVCOM) was used to determine the existing VMT per service population for TAZ 1025, where the Project is located. TAZ 1025 was found to generate 29.7 VMT per service population, which is below the City of Lake Elsinore's current citywide average VMT per service population of 35.5. The Project's proposed construction-related land use aligns with the existing land uses in TAZ 1025, such as construction and industrial employees, and is not anticipated introduce changes travel patterns in the area.
The Project is located in a low VMT -generating area based on VMT per service population.
Attachment B contains a screen shot of the Screening Tool output for the Project TAZ.
Low VMT Area Screening step is met.
STEP 3: PROJECT TYPE SCREENING
The City Guidelines identifies that local serving retail projects less than 50,000 square feet may be presumed to have a less than significant impact absent substantial evidence to the contrary.
In addition to local serving retail, other types of local serving use (e.g., local parks, local serving gas stations, non -destination hotels, affordable housing, places of worship, etc.) may also be presumed to have a less than significant impact as their uses are local serving in nature and would tend to shorten vehicle trips.
4 Based on the Project’s operational characteristics the Project does not lend itself to be considered a local serving use.
In addition, the City Guidelines states that small land use projects generating 110 or fewer daily vehicle trips are assumed to cause a less than significant impact on VMT.
TRIP GENERATION
Trip generation represents the amount of traffic which is both attracted to and produced by a development. Determining traffic generation for a specific project is therefore based upon forecasting the amount of traffic that is expected to be both attracted to and produced by the specific land uses being proposed for a given development.
In order to develop the traffic characteristics of the proposed Project, trip- generation statistics published in the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021) was used to estimate the trip generation. The latest Trip Generation Manual does not have
3 Baseline refers to the year the VMT analysis is performed or the Project’s Notice of Preparation Year. 4 City Guidelines; Page 5
Alan Fleming, AF Properties, LLC
November 2, 2023
15715-01 VMT
a land use category for the proposed storage yard for concrete pump trucks. As such, the following land use category has been selected from the Trip Generation Manual which closely estimates the anticipated traffic for the proposed Project:
• Th e trip generation rates for ITE land use code 180 (Specialty Trade Contractor) have been used to derive site specific trip generation estimates for the Project based on the total number of employees . In addition to the 10- 12 employees on site within the administrative offices, the calculations also assume an additional 12 drivers for the trucks (e.g., up to 24 employees). The vehicle mix has been obtained from the ITE’s Trip Generation Manual . All trucks are assumed to be 4+- axle in an effort to conduct a conservative analysis.
As noted in Table 1, refinements to the raw trip generation estimates have been made to provide a more detailed breakdown of trips between passenger cars and trucks. Trip generation for heavy trucks was further broken down by truck type (or axle type).
TABLE 1: PROJECT TRIP GENERATION RATES
The Project is estimated to generate a total of 88 two-way trips per day on a typical weekday as shown in Table 2.
TABLE 2: PROJECT TRIP GENERATION SUMMARY
The Project is forecasted to generate 88 daily vehicle trips, which is below the 110 daily trip threshold.
The Project Type Screening step is met.
CONCLUSION
In Summary, the proposed Project was evaluated consistent with the City Guidelines and was found to meet the Low Area VMT screening step and the Project Type screening step. Therefore, ITE LU AM Peak Hour PM Peak Hour
Land Use1 Units2 Code In Out Total In Out Total
Actual Vehicle Trip Generation Rates
Specialty Trade Contractor EMP 180 0.451 0.159 0.610 0.230 0.490 0.720 3.630 Passenger Cars 0.208 0.073 0.281 0.225 0.485 0.710 3.420 4+-Axle Trucks 0.005 0.005 0.010 0.005 0.005 0.010 0.210 1 Trip Generation & Vehicle Mix Source: Institute of Transportation Engineers (ITE), Trip Generation Manual , Eleventh Edition (2021). 2 Emp = Employees
Daily
Land Use Quantity Units1 In Out Total In Out Total Daily Actual Vehicles:
Concrete Pump Truck Storage Yard 24 Emp
Passenger Cars: 5 2 7 5 12 17 82
4+-axle Trucks: 0 0 0 0 0 0 6
Total Trips (Actual Vehicles)2 5 2 7 5 12 17 88
1 Emp = Employees
2 Total Trips = Passenger Cars + Truck Trips.
AM Peak Hour PM Peak Hour
Alan Fleming, AF Properties, LLC
November 2, 2023
15715-01 VMT
the Project is presumed to have a less than significant impact and no further VMT analysis is required.
If you have any questions, please contact me directly at [email protected].
15715-01 VMT
REFERENCES
1. City of Lake Elsinore. Traffic Impact Analysis Preparation Guide. City of Lake Elsinore : s.n., June 2020.
15715-01 VMT
ATTACHMENT A
PRELIMINARY SITE PLAN
15715-01 VMT
15715-01 VMT
ATTACHMENT B
WRCOG SCREENING TOOL
15715-01 VMT
Fleming and Sons Concrete Yard Project Appendix C
City of Lake Elsinore Class 32 Exemption Checklist
Appendix C: Noise Impact Analysis
/0/1/2/3/4/5/6/7/8/9/7/10/10/1/9/7/8/5/11/5/0/1/2/7/12/13/14/1/15/2/16/14/7/5/17/18/2/7/7/9/7/8/5/11/5/17/2/1/19/9/7/8/5/11/5/20/14/9/12/10/5/21/5/22/9/23/1/2/16/14/7 /24/9/1/5/25/26/2/18/9/15/27/5/11/5/28/18/14/23/2/18/5/29/18/9/30/2/15/10/5/29/31/2/7/8/10/5/11/5/32/10/2/18/15/31/5/33/9/12/19/5/24/12/12/10/12/12/30/10/7/15 /34/35/36/37/38/39/40 /41/42/39/41/43/36/44/36
/45/46/37/45/38/39/40 /44/43/46/41/47/48/49/43/50
/39/42/38/51/36/38/37/45/49/41/44/49/39/49/35/48/51/38/51 /52/53/54/55/56/57/58/59/60/61/62/63/64/53/65/56/66/61
/67/61/68/61/69/70/61/66/71/71/72/73/74/73/75
/76/77/61/78/53/64/61/79/80/81/63/55/73/82/72/73/74/73/83/84 HIDDEN>
FLEMING CONCRETE
PUMPING TRUCK YARD
NOISE IMPACT ANALYSIS
City of Lake Elsinore
December 11, 2023
(Revised July 26, 2024)
prepared by
Roma Stromberg INCE, MS
Catherine Howe, MS
GANDDINI GROUP INC.
555 Parkcenter Drive, Suite 225
Santa Ana, CA 92705
(714) 795-3100 | ganddini.com Project No. 19687
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
i 19687
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................................................................. III
1. INTRODUCTION .................................................................................................................................................... 1 Purpose and Objectives ................................................................................................................................................. 1 Project Location ............................................................................................................................................................... 1 Project Description .......................................................................................................................................................... 1
2. NOISE AND VIBRATION FUNDAMENTALS .................................................................................................. 4 Noise Fundamentals ....................................................................................................................................................... 4 Vibration Fundamentals ................................................................................................................................................. 4
3. EXISTING NOISE ENVIRONMENT .................................................................................................................... 8 Existing Land Uses and Sensitive Receptors ............................................................................................................ 8 Ambient Noise Measurements ..................................................................................................................................... 8
4. REGULATORY SETTING .................................................................................................................................... 12 Federal Regulation ........................................................................................................................................................ 12 Federal Noise Control Act of 1972 ............................................................................................................. 12 State Regulations .......................................................................................................................................................... 12 State of California General Plan Guidelines 2017 ................................................................................... 12 California Department of Transportation (Caltrans) ................................................................................ 12 Local Regulations .......................................................................................................................................................... 13 City of Lake Elsinore General Plan ............................................................................................................... 13 City of Lake Elsinore Municipal Code ......................................................................................................... 13
5. ANALYTICAL METHODOLOGY AND MODEL PARAMETERS................................................................ 23 Construction Noise Modeling ................................................................................................................................... 23 Stationary Source/Operational Noise Modeling .................................................................................................. 23 Mobile Source Noise Modeling ................................................................................................................................. 24 Groundborne Vibration Modeling ............................................................................................................................ 25
6. NOISE AND VIBRATION IMPACTS ................................................................................................................ 29 Noise Impacts ................................................................................................................................................................ 29 Construction Noise ........................................................................................................................................... 29 Project Operational Noise (Onsite) .............................................................................................................. 30 Project Operational Noise (Offsite) .............................................................................................................. 30 Groundborne Vibration Impacts ............................................................................................................................... 32 Air Traffic Impacts ........................................................................................................................................................ 33
7. REFERENCES ......................................................................................................................................................... 43
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
ii 19687
Appendices
Appendix A List of Acronyms
Appendix B Definitions of Acoustical Terms
Appendix C Noise Measurement Field Worksheets
Appendix D Construction Noise Model Worksheets
Appendix E SoundPLAN Worksheets
Appendix F FHWA Traffic Noise Model Worksheets
Appendix G Groundborne Vibration Worksheets
List of Tables
Table 1. Short-Term Noise Measurement Summary (dBA)....................................................................................... 9 Table 2. Long-Term Noise Measurement Summary (LTNM1) (dBA) .................................................................. 10 Table 3. Guideline Vibration Damage Potential Threshold Criteria ..................................................................... 16 Table 4. Guideline Vibration Annoyance Potential Criteria ................................................................................... 17 Table 5. City of Lake Elsinore Noise and Land Use Compatibility Matrix .......................................................... 18 Table 6. City of Lake Elsinore Interior and Exterior Noise Standards ................................................................. 19 Table 7. City of Lake Elsinore Exterior Noise Limits ................................................................................................ 20 Table 8. City of Lake Elsinore Interior Noise Levels ................................................................................................ 21 Table 9. City of Lake Elsinore Construction/Demolition Schedule ..................................................................... 22 Table 10. CA/T Equipment Noise Emissions and Acoustical Usage Factor Database ...................................... 26 Table 11. Project Average Daily Traffic Volumes and Roadway Parameters ...................................................... 27 Table 12. Construction Equipment Vibration Source Levels ................................................................................... 28 Table 13. Construction Noise Levels (dBA Leq) .......................................................................................................... 34 Table 14. Project Compliance with City of Lake Elsinore Stationary Noise Standards ..................................... 36 Table 15. Increase in Existing Noise Levels Along Roadways as a Result of Project (dBA CNEL) ................. 37 Table 16. Construction Vibration Levels at the Nearest Receptors ....................................................................... 38
List of Figures
Figure 1. Project Location Map .......................................................................................................................................... 2 Figure 2. Site Plan .................................................................................................................................................................. 3 Figure 3. A-Weighted Comparative Sound Levels ........................................................................................................ 6 Figure 4. Typical Levels of Groundborne Vibration ...................................................................................................... 7 Figure 5. Noise Measurement Location Map .............................................................................................................. 11 Figure 6. Existing Sensitive Receptors .......................................................................................................................... 39 Figure 7. Zoning .................................................................................................................................................................. 40 Figure 8. Operational Noise Levels (dBA Leq) ............................................................................................................ 41 Figure 9. Operational Noise Contours (dBA Leq) ...................................................................................................... 42 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
iii 19687
EXECUTIVE SUMMARY
The approximately 1.6-acre project site is located at the southwest corner of the intersection of West Minthorn Street and North Riley Street in the City of Lake Elsinore, California. The project site is currently vacant and zoned as Limited Manufacturing District (M-1).
The proposed project includes the development of a concrete pumping truck storage yard, minor maintenance, and administrative office building of approximately 7,500 square feet. Access to the site would be accommodated via the two proposed driveways on North Riley Street.
The Project will have 10-12 concrete pump semi-trucks parked on the site. Each day most will leave the yard and return. Trucks that are not working receive needed light duty maintenance such as tires, pipes, hoses, check and maintain fluids, fix mirror or windshield, etc. to be ready for use the following day. No major repair work is done on-site. Trucks will leave the yard, go directly to different jobsites each day, meet with concrete mixing trucks at the site and concrete is poured from the concrete trucks through the pumps to place concrete at the jobsite. Trucks will be washed out and cleaned off-site before returning to the yard. Trucks will also be re-fueled off-site. Sales and parts ordering personnel will work out of the administrative office. Typical operations will occur Monday through Friday (with occasional weekend operations) from 4:00 AM to 6:00 PM. There will be approximately 10-12 employees on the site at any given time.
Existing Noise Environment
Sensitive receptors that may be affected by project generated noise include the property lines of the existing single-family residential uses located approximately 480 feet to the east (at the northeast corner of Minthorn Street and Spring Street), 425 feet to the southwest (along Langstaff Street), 460 feet east (along Spring Street), and 595 feet southeast (along Flint Street) and the single-family and multi-family residential uses located approximately 300 feet to the west (along Langstaff Street) of the project site boundaries.
Measured short-term ambient noise levels in the project vicinity ranged between 53 and 67.7 dBA L eq and long-term ambient noise levels ranged between 49.7 to 61.3 dBA L eq. The dominant noise source in the project vicinity was vehicle traffic Interstate 15, W Flint Street, N Spring Street, N Langstaff and other surrounding roadways.
Construction Noise Impacts
The project will comply with the hours specified in Section 17.176.080 of the City of Lake Elsinore Municipal Code. Based on the modeled construction noise levels, project construction noise levels will not exceed the applicable City mobile equipment noise thresholds at any of the modeled receptors. No mitigation is required.
On-Site Operation Noise Impacts
project operational noise is expected to range between 35.8 and 43.9 dBA L eq at nearby land uses and will not exceed the applicable stationary noise standards. This impact would be less than significant. No mitigation is required.
Mobile Source Noise Impacts
The addition of project trips is not expected to change noise levels more than the applicable threshold at any of the study roadway segments. The project impact is less than significant; no mitigation is required.
Groundborne Vibration Impacts
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
iv 19687
Groundborne vibration generated by project construction would not exceed the levels necessary to cause architectural damage to sensitive receptors. In addition, due to the distance to the nearest sensitive receptors, the threshold for annoyance due to vibration would not be anticipated to be exceeded. Furthermore, perceptibility of construction vibration would be temporary and would occur only during daytime hours. This impact would be less than significant. No mitigation is required.
Air Traffic Impacts
The closest airport to the project site is Skylark Airport, with airport runways located as close as approximately
3.06 miles to the southeast of the project site. Therefore, as Skylark Airport is further than two miles from the project site and is a small private airport, the proposed project would not expose people residing in or working in the area to excessive noise levels. The impact would be less than significant; no mitigation is required.
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
1 19687
1. INTRODUCTION
This section describes the purpose of this study and the proposed project.
PURPOSE AND OBJECTIVES
The purpose of this report is to provide an assessment of the noise impacts resulting from development of the proposed project and to identify mitigation measures that may be necessary to reduce those impacts. The noise issues related to the proposed land use and development have been evaluated in light of applicable federal, state and local policies, including those of the City of Lake Elsinore, in the context of the California Environmental Quality Act (CEQA).
Although this is a technical report, effort has been made to write the report clearly and concisely. A list of acronyms and glossary are provided in Appendix A and Appendix B of this report to assist the reader with technical terms related to noise and vibration analysis.
PROJECT LOCATION
The approximately1.6-acre project site is located at the southwest corner of the intersection of West Minthorn Street and North Riley Street in the City of Lake Elsinore, California. The project site is currently vacant and zoned as Limited Manufacturing District (M-1). A vicinity map showing the project location is provided on Figure 1.
PROJECT DESCRIPTION
The proposed project includes the development of a concrete pumping truck storage yard, minor maintenance, and administrative office building of approximately 7,500 square feet. Access to the site would be accommodated via the two proposed driveways on North Riley Street. Figure 2 illustrates the project site plan.
The Project will have 10-12 concrete pump semi-trucks parked on the site. Each day most will leave the yard and return. Trucks that are not working receive needed light duty maintenance such as tires, pipes, hoses, check and maintain fluids, fix mirror or windshield, etc. to be ready for use the following day. No major repair work is done on-site. Trucks will leave the yard, go directly to different jobsites each day, meet with concrete mixing trucks at the site and concrete is poured from the concrete trucks through the pumps to place concrete at the jobsite. Trucks will be washed out and cleaned off-site before returning to the yard. Trucks will also be re-fueled off-site. Sales and parts ordering personnel will work out of the administrative office. Typical operations will occur Monday through Friday (with occasional weekend operations) from 4:00 AM to 6:00 PM. There will be approximately 10-12 employees on the site at any given time.
1 Figure 1
Project Location Map
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
N
15 MAIN ST
SPRING ST
RILEY ST
FLINT ST
POE ST
LANGSTAFF ST
FLINT ST
Site
MINTHORN ST
2 NO PARKING
NO PARKING
EV CAPABLE
EV CAPABLE
EV CAPABLE
EV CAPABLE
NORTH RILEY ST C/L
WEST MINTHORN ST C/L
TEMESCAL W
ASH / LAKE ELSINORE OUTFLOW
CHANNEL
Figure 2
Site Plan
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
N
3 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
4 19687
2. NOISE AND VIBRATION FUNDAMENTALS
This section provides an overview of key noise and vibration concepts.
NOISE FUNDAMENTALS
Sound is a pressure wave created by a moving or vibrating source that travels through an elastic medium such as air. Noise is defined as unwanted or objectionable sound. The effects of noise on people can include general annoyance, interference with speech communication, sleep disturbance, and in extreme circumstances, hearing impairment.
Commonly used noise terms are presented in Appendix B. The unit of measurement used to describe a noise level is the decibel (dB). The human ear is not equally sensitive to all frequencies within the sound spectrum.
Therefore, the “A-weighted” noise scale, which weights the frequencies to which humans are sensitive, is used for measurements. Noise levels using A-weighted measurements are written dB(A) or dBA.
From the noise source to the receiver, noise changes both in level and frequency spectrum. The most obvious is the decrease in noise as the distance from the source increases. The manner in which noise reduces with distance depends on whether the source is a point or line source as well as ground absorption, atmospheric effects and refraction, and shielding by natural and manmade features. Sound from point sources, such as air conditioning condensers, radiates uniformly outward as it travels away from the source in a spherical pattern.
The noise drop-off rate associated with this geometric spreading is 6 dBA per each doubling of the distance (dBA/DD). Transportation noise sources such as roadways are typically analyzed as line sources, since at any given moment the receiver may be impacted by noise from multiple vehicles at various locations along the roadway. Because of the geometry of a line source, the noise drop-off rate associated with the geometric spreading of a line source is 3 dBA/DD.
Decibels are measured on a logarithmic scale, which quantifies sound intensity in a manner similar to the Richter scale used for earthquake magnitudes. Thus, a doubling of the energy of a noise source, such as a doubled traffic volume, would increase the noise levels by 3 dBA; halving of the energy would result in a 3 dBA decrease. Figure 3 shows the relationship of various noise levels to commonly experienced noise events.
Average noise levels over a period of minutes or hours are usually expressed as dBA L eq, or the equivalent noise level for that period of time. For example, Leq(3-hr) would represent a 3-hour average. When no period is specified, a one-hour average is assumed.
Noise standards for land use compatibility are stated in terms of the Community Noise Equivalent Level (CNEL) and the Day-Night Average Noise Level (DNL). CNEL is a 24-hour weighted average measure of community noise. CNEL is obtained by adding five decibels to sound levels in the evening (7:00 PM to 10:00 PM), and by adding ten decibels to sound levels at night (10:00 PM to 7:00 AM). This weighting accounts for the increased human sensitivity to noise during the evening and nighttime hours. DNL is a very similar 24- hour average measure that weights only the nighttime hours.
It is widely accepted that the average healthy ear can barely perceive changes of 3 dBA; that a change of 5 dBA is readily perceptible, and that an increase (decrease) of 10 dBA sounds twice (half) as loud. This definition is recommended by the California Department of Transportation’s Technical Noise Supplement to the Traffic Noise Analysis Protocol (2013).
VIBRATION FUNDAMENTALS
The way in which vibration is transmitted through the earth is called propagation. Propagation of earthborn vibrations is complicated and difficult to predict because of the endless variations in the soil through which waves travel. There are three main types of vibration propagation: surface, compression and shear waves. 4 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
5 19687
Surface waves, or Rayleigh waves, travel along the ground’s surface. These waves carry most of their energy along an expanding circular wave front, similar to ripples produced by throwing a rock into a pool of water.
Compression waves, or P-waves, are body waves that carry their energy along an expanding spherical wave front. The particle motion in these waves is longitudinal (i.e., in a “push-pull” fashion). P-waves are analogous to airborne sound waves. Shear waves, or S-waves, are also body waves that carry energy along an expanding spherical wave front. However, unlike P-waves, the particle motion is transverse or “side-to-side and perpendicular to the direction of propagation”.
As vibration waves propagate from a source, the energy is spread over an ever-increasing area such that the energy level striking a given point is reduced with the distance from the energy source. This geometric spreading loss is inversely proportional to the square of the distance. Wave energy is also reduced with distance as a result of material damping in the form of internal friction, soil layering, and void spaces. The amount of attenuation provided by material damping varies with soil type and condition as well as the frequency of the wave.
Vibration amplitudes are usually expressed as either peak particle velocity (PPV) or the root mean square (RMS) velocity. The PPV is defined as the maximum instantaneous peak of the vibration signal in inches per second. The RMS of a signal is the average of the squared amplitude of the signal in vibration decibels (VdB), ref one micro-inch per second. The Federal Railroad Administration uses the abbreviation “VdB” for vibration decibels to reduce the potential for confusion with sound decibel.
PPV is appropriate for evaluating the potential of building damage and VdB is commonly used to evaluate human response. Decibel notation acts to compress the range of numbers required in measuring vibration.
Similar to the noise descriptors, L eq and Lmax can be used to describe the average vibration and the maximum vibration level observed during a single vibration measurement interval. Figure 4 illustrates common vibration sources and the human and structural responses to ground-borne vibration. As shown in the figure, the threshold of perception for human response is approximately 65 VdB; however, human response to vibration is not usually substantial unless the vibration exceeds 70 VdB. Vibration tolerance limits for sensitive instruments such as magnetic resonance imaging (MRI) or electron microscopes could be much lower than the human vibration perception threshold.
5 Figure 3
A-Weighted Comparative Sound Levels
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
© Ganddini Group, Inc.
Based on Policy & Guidance from Federal Aviation Administration 6 Figure 4
Typical Levels of Groundborne Vibration
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
Source: FRA, 2012. Federal Railroad Administration High-Speed G round Transportation Noise and Vibration Impact Assessment. Office of Railroad Policy Development, Washington, D.C. DOT/FRA/ORD-12/15. September. 7 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
8 19687
3. EXISTING NOISE ENVIRONMENT
This section describes the existing noise setting in the project vicinity.
EXISTING LAND USES AND SENSITIVE RECEPTORS
The project site is generally bordered by W Minthorn Street to the north; N Riley Street to the east; W Flint Street to the south; and the Temescal Wash/Lake Elsinore Outflow Channel to the west.
The State of California defines sensitive receptors as those land uses that require serenity or are otherwise adversely affected by noise events or conditions. Schools, libraries, churches, hospitals, single and multiple- family residential, including transient lodging, motels and hotel uses make up the majority of these areas.
Sensitive land uses that may be affected by project noise include the property lines of the existing single- family residential uses located approximately 480 feet to the east (at the northeast corner of Minthorn Street and Spring Street), 425 feet to the southwest (along Langstaff Street), 460 feet east (along Spring Street), and 595 feet southeast (along Flint Street) and the single-family and multi-family residential uses located approximately 300 feet to the west (along Langstaff Street) of the project site boundaries.
AMBIENT NOISE MEASUREMENTS
An American National Standards Institute (ANSI Section S1.4 2014 Class 1) Larson Davis model LxT sound level meter was used to document existing ambient noise levels. In order to document existing ambient noise levels in the project area, three (3) 15-minute daytime noise measurements were taken between 12:23 PM and 2:05 PM on November 28, 2023. In addition, one (1) long-term 24-hour noise measurement was also taken from November 28, 2023, to November 29, 2023. Figure 5 shows the noise measurement location map. Field worksheets and noise measurement worksheets are provided in Appendix C.
As shown in Figure 5, the noise meter was placed at the following locations:
STNM1: represents the existing noise environment of the single-family residential uses located southwest of the project site along Langstaff Street (416 N Langstaff Street, Lake Elsinore). The noise meter was placed just northeast of the residential use.
STNM2: represents the existing noise environment of the single-family residential uses along W Flint Street (109 W Flint Street, Lake Elsinore). The noise meter was placed just south of the southern property line of the residential use and just north of W Flint Street.
STNM3: represents the existing noise environment of the single-family residential uses located to the east of the project site along N Spring Street (516 N Spring Street, Lake Elsinore). The noise meter was placed just west of the western property line of the residential use and just east of N Spring Street.
LTNM1: represents the existing noise environment of the residential uses located west of the project site along N Langstaff Street (513 N Langstaff Street, Lake Elsinore). The noise meter was placed just east of the eastern property line of the residential use and just west of N Langstaff Street.
Table 1 provides a summary of the short-term ambient noise data. Table 2 provides hourly interval ambient noise data from the long-term noise measurements. Measured short-term ambient noise levels ranged between 53 and 67.7 dBA L eq. Long-term hourly noise measurement ambient noise levels ranged from 49.7 to 61.3 dBA Leq. The dominant noise source was vehicle traffic associated with the 15 Freeway, W Flint Street, N Spring Street, N Langstaff and other surrounding roadways. 8 Site Location Time Started Leq Lmax Lmin L(2) L(8) L(25) L(50) STNM1 12:23 PM 53.0 57.6 49.0 55.9 54.8 53.6 52.7
STNM2 1:17 PM 60.9 76.9 46.5 67.6 64.7 61.3 56.9
STNM3 1:50 PM 67.7 81.9 51.3 74.5 71.6 68.2 65.2
(1) See Figure 5 for noise measurement locations. Each noise measurement was performed over a 15-minute duration. (2) Noise measurements performed on November 28, 2023.
Notes:
Table 1
Short-Term Noise Measurement Summary (dBA)
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
9 Leq Lmax Lmin L(2) L(8) L(25) L(50)
4:00 PM 57.3 83.5 42.8 63.1 61.1 58.2 55.3
4:00 PM 49.7 64.7 44.6 55.1 51.4 50.0 48.7
5:00 PM 55.1 77.4 44.4 61.9 55.7 53.8 50.3
6:00 PM 57.2 69.6 50.9 61.5 59.3 57.8 56.2
7:00 PM 61.3 71.1 53.8 64.4 63.3 62.0 60.8
8:00 PM 58.7 70.8 51.7 63.4 62.1 59.5 57.5
9:00 PM 58.6 64.5 50.8 62.7 61.4 59.6 57.9
10:00 PM 58.3 65.7 51.5 62.0 60.7 59.0 57.6
11:00 PM 57.1 65.2 47.7 61.6 60.1 58.5 56.4
12:00 AM 55.3 61.5 47.6 59.1 57.7 56.1 54.8
1:00 AM 55.3 62.1 46.2 59.5 57.9 56.3 54.7
2:00 AM 54.2 61.2 47.0 58.1 56.7 55.1 53.7
3:00 AM 56.4 62.8 48.1 60.1 59.0 57.4 55.8
4:00 AM 59.8 69.7 54.4 62.8 61.6 60.6 59.5
5:00 AM 60.0 70.2 52.8 63.5 62.5 61.2 59.5
6:00 AM 61.1 76.3 53.0 64.7 63.6 62.4 60.6
7:00 AM 59.2 71.0 51.0 63.8 61.9 60.3 58.8
8:00 AM 54.7 67.3 47.8 58.8 57.1 55.6 54.0
9:00 AM 54.0 78.4 43.9 57.6 55.5 53.8 51.7
10:00 AM 53.0 62.2 42.8 58.0 56.7 54.5 51.3
11:00 AM 56.8 72.1 49.8 64.4 57.5 55.8 54.6
12:00 PM 55.2 70.2 47.7 60.3 57.7 55.5 53.9
1:00 PM 54.1 66.9 46.8 58.8 56.7 55.1 53.4
2:00 PM 58.0 83.5 44.0 63.0 56.5 52.4 49.5
3:00 PM 53.9 75.7 44.1 61.2 56.9 52.1 49.0
(1)
(2)
See Figure 5 for noise measurement locations. Noise measurement was performed over a 24-hour duration.
Noise measurement performed from November 28, 2023 to November 29, 2023.
Time Started
Table 2
Long-Term Noise Measurement Summary (dBA)
24-Hour Ambient Noise1,2
Hourly
Measurements
Overall Summary
1 2
3 4
5 6
7 8
24 Notes:
19 20
21 22
23 14
15 16
17 18
9 10
11 12
13 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
10 Figure 5
Noise Measurement Location Map
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
N
15 MAIN ST
SPRING ST
RILEY ST
FLINT ST
POE ST
LANGSTAFF ST
FLINT ST
Site
MINTHORN ST
Noise Measurement Location
Legend
NM 1
Short-Term Noise MeasurementST NM
Long-Term Noise MeasurementLT NM
ST NM 3
ST NM 2
ST NM 1
LT NM 1
11 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
12 19687
4. REGULATORY SETTING
This section documents the regulatory framework and applicable noise standards.
FEDERAL REGULATION
Federal Noise Control Act of 1972
The U.S. Environmental Protection Agency (EPA) Office of Noise Abatement and Control was originally established to coordinate federal noise control activities. After its inception, EPA’s Office of Noise Abatement and Control issued the Federal Noise Control Act of 1972, establishing programs and guidelines to identify and address the effects of noise on public health, welfare, and the environment. In response, the EPA published Information on Levels of Environmental Noise Requisite to Protect Public Health and Welfare with an Adequate Margin of Safety (Levels of Environmental Noise). The Levels of Environmental Noise recommended that the Ldn should not exceed 55 dBA outdoors or 45 dBA indoors to prevent significant activity interference and annoyance in noise-sensitive areas.
In 1981, EPA administrators determined that subjective issues such as noise would be better addressed at lower levels of government. Consequently, in 1982 responsibilities for regulating noise control policies were transferred to State and local governments. However, noise control guidelines and regulations contained in EPA rulings in prior years remain in place by designated Federal agencies, allowing more individualized control for specific issues by designated Federal, State, and local government agencies.
STATE REGULATIONS
State of California General Plan Guidelines 2017
Though not adopted by law, the State of California General Plan Guidelines 2017, published by the California Governor’s Office of Planning and Research (OPR) (OPR Guidelines), provides guidance for the compatibility of projects within areas of specific noise exposure. The OPR Guidelines identify the suitability of various types of construction relative to a range of outdoor noise levels and provide each local community some flexibility in setting local noise standards that allow for the variability in community preferences. Findings presented in the Levels of Environmental Noise Document (EPA 1974) influenced the recommendations of the OPR Guidelines, most importantly in the choice of noise exposure metrics (i.e., Ldn or CNEL) and in the upper limits for the normally acceptable outdoor exposure of noise-sensitive uses.
The OPR Guidelines include a Noise and Land Use Compatibility Matrix which identifies acceptable and unacceptable community noise exposure limits for various land use categories. Where the “normally acceptable” range is used, it is defined as the highest noise level that should be considered for the construction of the buildings which do not incorporate any special acoustical treatment or noise mitigation. The “conditionally acceptable” or “normally unacceptable” ranges include conditions calling for detailed acoustical study prior to the construction or operation of the proposed project.
California Department of Transportation (Caltrans)
The California Department of Transportation has published one of the seminal works for the analysis of ground-borne noise and vibration relating to transportation- and construction-induced vibrations and although the project is not subject to these regulations, it serves as useful tools to evaluate vibration impacts.
As shown in Table 3, the threshold at which there is a risk to “architectural” damage to historic and some older buildings is a peak particle velocity (PPV) of 0.25, at older residential structures a PPV of 0.3, and at new residential structures a PPV of 0.5. Table 4 shows that a PPV of 0.04 is the threshold at which groundborne vibration becomes distinctly perceptible in regard to annoyance. Therefore, these guidelines recommend that 12 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
13 19687
a standard of 0.3 inches per second (in/sec) PPV not be exceeded for the protection of older residential structures (California Department of Transportation, 2020).
LOCAL REGULATIONS
City of Lake Elsinore General Plan
The City of Lake Elsinore General Plan has established the following goals and policies in regard to noise which apply to the proposed project.
Goal 7 Maintain an environment for all City residents and visitors free of unhealthy, obtrusive, or otherwise excessive noise.
Policies
7.1 Apply the noise standards set forth in the Lake Elsinore Noise and Land Use Compatibility Matrix (see Table 5) and Interior and Exterior Noise Standards (see Table 6) when considering all new development and redevelopment proposed within the City.
7.2 Require that mixed-use structures and areas be designed to prevent transfer of noise and vibration from commercial areas to residential areas.
7.3 Strive to reduce the effect of transportation noise on the I-15.
7.4 Consider estimated roadway noise contours based upon Figure 3.6, Noise Contours of the General Plan, when making land use design decisions along busy roadways throughout the City.
7.5 Participate and cooperate with other agencies and jurisdictions in the development of noise abatement plans for highways.
City of Lake Elsinore Municipal Code
Section 17.176.060 Exterior noise limits.
A. Maximum permissible sound Levels by receiving land use.
1. The noise standards for the various categories of land use identified by the Noise Control Office(r) as presented in Table 7 shall, unless otherwise specifically indicated, apply to all such property within a designated zone.
2. No person shall operate, or cause to be operated, any source of sound at any location within the incorporated City or allow the creation of any noise on property owned, leased, occupied or otherwise controlled by such person, which causes the noise level when measured on any other property, either incorporated or unincorporated, to exceed:
a. The noise standard for that land use as specified in Table 7 for a cumulative period of more than 30 minutes in any hour; or
b. The noise standard plus five dB for a cumulative period of more than 15 minutes in any hour; or
c. The noise standard plus 10 dB for a cumulative period of more than five minutes in any hour; or
d. The noise standard plus 15 dB for a cumulative period of more than one minute in any hour; or
e. The noise standard plus 20 dB or the maximum measured ambient level, for any period of time.
3. If the measured ambient level differs from that permissible within any of the fast four noise limit categories above, the allowable noise exposure standard shall be adjusted in five dB increments in each category as appropriate to encompass or reflect said ambient noise level. 13 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
14 19687
4. If the measurement location is on a boundary between two different zones, the noise level limit applicable to the lower noise zone plus six dB shall apply.
5. If possible, the ambient noise shall be measured at the same location along the property line utilized in subsection (A)(2) of this section with the alleged offending noise source inoperative. If, for any reason, the alleged offending noise source cannot be shut down, the ambient noise must be estimated by performing a measurement in the same general area of the source but at a sufficient distance such that the noise from the source is at least 10 dB below the ambient in order that only the ambient level be measured. If the difference between the ambient and the noise source is five to 10 dB, then the level of the ambient itself can be reasonably determined by subtracting a one- decibel correction to account for the contribution of the source.
B. Correction for Character of Sound. In the event the alleged offensive noise, as judged by the Noise Control Officer, contains a steady, audible tone such as a whine, screech, or hum, or is a repetitive noise such as hammering or riveting, or contains music or speech conveying informational content, the standard limits set forth in Table 7 shall be reduced by five dB.
Section 17.176.070 Interior noise standards.
A. Maximum permissible dwelling interior sound levels.
1. The interior noise standards for multifamily residential dwellings as presented in Table 8 shall apply, unless otherwise specifically indicated, within all such dwellings with windows in their normal seasonal configuration.
2. No person shall operate or cause to be operated within a dwelling unit, any source of sound or allow the creation of any noise which causes the noise level when measured inside a neighboring receiving dwelling unit to exceed:
a. The noise standard as specified in Table 8 for a cumulative period of more than five minutes in any hour; or
b. The noise standard plus five dB for a cumulative period of more than one minute in any hour; or
c. The noise standard plus 10 dB or the maximum measured ambient, for any period of time.
3. If the measured ambient level differs from that permissible within any of the noise limit categories above, the allowable noise exposure standard shall be adjusted in five dB increments in each category as appropriate to reflect said ambient noise level.
B. Correction for Character of Sound. In the event the alleged offensive noise, as judged by the Noise Control Officer, contains a steady, audible tone such as a whine, screech, or hum, or is a repetitive noise such as hammering or riveting, or contains music or speech conveying informational content, the standard limits set forth in Table 8 shall be reduced by five dB. [Ord. 772 § 17.78.070, 1986. Code 1987 § 17.78.070].
Section 17.176.080 Prohibited acts.
No person shall unnecessarily make, continue, or cause to be made or continued, any noise disturbance. The following acts, and the causing or permitting thereof, are declared to be in violation of this chapter:
E. Loading, unloading, opening, closing or other handling of boxes, crates, containers, building materials, garbage cans, or similar objects between the hours of 10:00 PM and 7:00 AM in such a manner as to cause a noise disturbance across a residential real property line or at any time to violate the provisions of LEMC 17.176.060(A).
F. Construction/Demolition.
1. Operating or causing the operation of any tools or equipment used in construction, drilling, repair, alteration, or demolition work between weekday hours of 7:00 PM and 7:00 AM, or at any time on weekends or holidays, such that the sound therefrom creates a noise disturbance across a residential or commercial real property line, except for emergency work of public service utilities or by variance issued by the City.
14 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
15 19687
2. Noise Restrictions at Affected Properties. Where technically and economically feasible, construction activities shall be conducted in such a manner that the maximum noise levels at affected properties will not exceed those listed in the schedule provided in Table 9.
3. All mobile or stationary internal combustion engine powered equipment or machinery shall be equipped with suitable exhaust and air intake silencers in proper working order.
G. Operating or permitting the operation of any device that creates a vibration which is above the vibration perception threshold of any individual at or beyond the property boundary of the source if on private property or at 150 feet (46 meters) from the source if on a public space or public right-of-way.
K. Noise Sensitive Zones.
1. Creating or causing the creation of any sound within any noise sensitive zone, so as to exceed the specified land use noise standards set forth in LEMC 17.176.060(A); provided, that conspicuous signs are displayed indicating the zone; or
2. Creating or causing the creation of any sound within or adjacent to any noise sensitive zone, containing a hospital, nursing home, school, court or other designated area, so as to interfere with the functions of such activity or annoy the occupants in the activity; provided, that conspicuous signs are displayed indicating the presence of the zone.
15 Transient Sources Sources
Extremely fragile historic buildings, ruins, ancient monuments 0.12 0.08 Fragile buildings 0.2 0.1
Historic and some old buildings 0.5 0.25
Older residential structures 0.5 0.3
New residential structures 1.0 0.5
Modern industrial/commercial buildings 2.0 0.5
Notes:
Source: California Department of Transportation. Transportation and Construction Vibration Guidance Manual, Chapter 7 Table 19, April 2020.
1. Transient sources create a single isolated vibration event, such as blasting or drop balls. Continuous/frequent intermittent sources include impact pile drivers, pogo-stick compactors, crack-and-seat equipment, vibratory pile drivers, and vibratory compaction equipment.
Table 3
Guideline Vibration Damage Potential Threshold Criteria Structure Condition
Maximum PPV (in/sec)
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
16 Transient Sources Intermittent Sources
Barely perceptible 0.04 0.01
Distinctly perceptible 0.25 0.04
Strongly perceptible 0.9 0.10
Severe 2.0 0.4
Source: California Department of Transportation. Transportation and Construction Vibration Guidance Manual, Chapter 7 Table 20, April 2020.
1. Transient sources create a single isolated vibration event, such as blasting or drop balls. Continuous/frequent intermittent sources include impact pile drivers, pogo-stick compactors, crack-and-seat equipment, vibratory pile drivers, and vibratory compaction equipment.
Table 4
Human Response
Guideline Vibration Annoyance Potential Criteria
Maximum PPV (in/sec)
Notes:
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
17 Categories Uses
Residential Single, Family, Duplex, Multiple Family A A B B C D D Residential Mobile Homes A A B C C D D
Commerical - Regional District Hotel, Motel, Transient Lodging A A B B C C D Commercial - Regional Village,
District Special
Commercial, Retail, Bank, Restaurant,
Movie Theatre A A A A B B C
Commercial - Recreation
Children's Amusement Park, Miniature
Golf Course, Go-Cart Track, Equestrian
Center, Sports Club
A A A B B D D
Commercial - General , Special
Industrial Institutional
Automobile Service Station, Auto
Dealership, Manufacturing,
Warehousing, Wholesale, Utilities
A A A A B B B
Institutional -General Hospital, Church, Library,
Schools, Classroom A A B C C D D
Open Space Parks A A A B C D D
Open Space
Golf Course, Cemeteries, Nature
Centers, Wildlife Reserves,
Wildlife Habitat
A A A A B C C
Agriculture Agriculture A A A A A A A
Zone C - Normally Incompatible:
Zone D - Clearly Incompatible:
Notes:
New construction or development should generally be discouraged. If new construction or development does proceed, a detailed analysis of the noise reduction requirements must be made and needed noise insulation features included in the design.
New construction or development should generally not be undertaken.
Zone A - ClearlyCompatible:
(1) Source: City of Lake Elsinore General Plan, Table 3-1.
Day-Night Noise Level (LDN)
Zone B - Normally Compatible:
City of Lake Elsinore Noise and Land Use Compatibility Matrix Table 5
Land Use Categories
Specified land use is satisfactory, based upon the assumption that any buildings involved are of normal conventional construction without any special noise insulation requirements.
New construction or development should be undertaken only after detailed analysis of the noise reduction requirements are made and needed insulation features in the design are determined. Conventional construction, with closed windows and fresh air supply systems or air conditioning, will normally suffice. 55 60 65 70 75 80
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
18 Uses Interior1 Exterior2
Single Family, Duplex, Multiple Family 45 3,5 60
Mobile Homes - 60 4
Hotel, Motel, Transient Lodging 45 5 -
Hospital, School's classroom 45 -
Church, Library 45 -
(3) Noise level requirement with closed windows. Mechanical ventilating system or other means of natural ventilation shall be provided as of Chapter 12, Section 1205 of UBC.
(4) Exterior noise level should be such that interior noise level will not exceed 45 CNEL. (5) As per California Administrative Code, Title 24, Part 6, Division T25, Chapter 1, Subchapter 1, Article 4, Section T25-28.
Table 6
(1) Indoor environment excluding: bathrooms, toilets, closets, corridors. (2) Outdoor environment limited to: Private yard of single family, multi-family private patio or balcony which is served by a means of exit from inside, Mobile Home Park.
Energy Average Ldn
Categories
Source: City of Lake Elsinore General Plan, Table 3-2.
City of Lake Elsinore Interior and Exterior Noise Standards Land Use Categories
Residential
Commercial, Industrial
Notes:
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
19 Reeiving Land Use Category Time Period Noise Level (dBA) 10:00 PM to 7:00 AM 40
7:00 AM 10 10:00 PM 50
10:00 PM to 7:00 AM 45
7:00 AM 10 10:00 PM 50
10:00 PM to 7:00 AM 55
7:00 AM 10 10:00 PM 60
10:00 PM to 7:00 AM 60
7:00 AM 10 10:00 PM 65
Light Industrial Anytime 70
Heavy Industrial Anytime 75
General Commercial
Public Space
Source: City of Lake Elsinore Municipal Code, 17.176.060 Exterior Noise Limits.
Table 7
City of Lake Elsinore Exterior Noise Limits
Single-Family Residential
Multiple Dwelling Residential
Limited Commercial and Office
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
20 Noise Zone Type of Land Use Time Internal
Allowable Interior Noise
Level
(dBA)
10:00 PM to 7:00 AM 35
7:00 AM to 10:00 PM 45
All Multifamily Residential
City of Lake Elsinore Interior Noise Limits
Table 8
Source: City of Lake Elsinore Municipal Code, 17.176.070 Interior noise standards.
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
21 Type 1 Areas Type II Areas Type III Areas
Description
Single Family
Residential
Multi-Family
Residential
Semi-Residential/
Commercial
Mobile Equipment
Maximum noise levels for nonscheduled, intermittent, short-term operation (less than 10 days) of mobile equipment:
Daily, except Sundays and Legal Holidays 7:00 AM to 7:00 PM 75 dBA 80 dBA 85 dBA Daily, 7:00 PM to 7:00 AM and all day Sunday and Legal Holidays 60 dBA 65 dBA 70 dBA Stationary Equipment
Maximum noise levels for repetitively scheduled and relatively long-term operation (period of 10 days or more) of stationary equipment:
Daily, except Sundays and Legal Holidays 7:00 Am to 7:00 PM 60 dBA 65 dBA 70 dBA Daily, 7:00 PM to 7:00 AM and all day Sunday and Legal Holidays 50 dBA 55 dBA 60 dBA Mobile Equipment
Maximum noise levels for nonscheduled, intermittent, short-term operation of mobile equipment:
Stationary Equipment
Maximum noise levels for repetitively scheduled and relatively long-term operation of stationary equipment:
Table 9
City of Lake Elsinore Construction/Demolition Schedule
Source: City of Lake Elsinore Municipal Code, 17.176.080 Prohibited acts.
At Residential Properties
Daily, including Sundays and Legal Holidays, all hours: maximum of 75 dBA.
At Business Properties
Daily, including Sundays and Legal Holidays, all hours: maximum of 85 dBA.
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
22 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
23 19687
5. ANALYTICAL METHODOLOGY AND MODEL PARAMETERS
This section discusses the analysis methodologies used to assess noise impacts.
CONSTRUCTION NOISE MODELING
Construction noise will vary depending on the construction process, type of equipment involved, location of the construction site with respect to sensitive receptors, the schedule proposed to carry out each task (e.g., hours and days of the week) and the duration of the construction work.
Construction noise associated with the proposed project was calculated at the sensitive receptor locations utilizing methodology presented in the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (2018) together with several key construction parameters, including: distance to each sensitive receiver, equipment usage, percent usage factor, and baseline parameters for the project site.
Distances to receptors were based on the acoustical center of the project site.
The equipment used to calculate the construction noise levels for each phase were based on the assumptions provided in the CalEEMod modeling in the Air Quality and Greenhouse Gas Assessment prepared for the proposed project (Urban Crossroads, 2023). For analysis purposes, the distance measured from the project site to sensitive receptors was assumed to be the acoustical center of the project site to the property line of residential properties with existing residential buildings. Sound emission levels associated with typical construction equipment as well as typical usage factors are provided in Table 10 . Construction noise worksheets are provided in Appendix D.
STATIONARY SOURCE/OPERATIONAL NOISE MODELING
The SoundPLAN acoustical modeling software was utilized to model project operational stationary noise levels from the proposed project to adjacent sensitive uses (e.g., residences). SoundPLAN is capable of evaluating stationary noise sources (e.g., parking lots, drive-through menus, car wash equipment, vacuums, etc.). The SoundPLAN software utilizes algorithms (based on the inverse square law) to calculate noise level projections.
The software allows the user to input specific noise sources, spectral content, sound barriers, building placement, topography, and sensitive receptor locations. In addition to the information provided below, noise modeling input and outputs assumptions are provided in Appendix E.
Operational noise levels were modeled utilizing representative sound levels in the SoundPLAN model.
Modeled noise sources include parking lot noise and HVAC equipment. All noise sources were modeled to be in full operation for an entire hour.
Parking Lot Noise
Parking lot noise was calculated using SoundPLAN methodology. Specifically, the traffic volume of the parking lot is entered with the number of moves per parking space, the hour and the number of parking bays. The user defines whether the parking lots are for automobiles, motorcycles, or trucks, and the emission level of a parking lot is automatically adjusted accordingly. The values for the number of parking moves for each time slice is the number of parking moves per reference unit (most often per parking bay), averaged for the hour 1.
SoundPLAN utilizes parking lot noise emission levels from the 6th revised edition of the parking lot study “Recommendations for the Calculation of Sound Emissions of Parking Areas, Motorcar Centers and Bus Stations as well as of Multi-Story Car Parks and Underground Car Parks” published by the Bavarian Landesamt für Umwelt provides calculation methods to determine the emissions of parking lots.
1 SoundPLAN Essential 4.0 Manual. SoundPLAN International, LLC. May 2016. 23 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
24 19687
The parking lot emission table documents the reference level (Lw, ref) from parking lot study:
Lw, ref = Lw0 + KPA + KI + KD + KStrO + 10 log(B) [dB(A)]
With the following parameters:
Lw0 = Basic sound power, sound power level of one motion / per hour on P+R areas = 63 dB(A) KPA = Surcharge parking lot type
KI = Surcharge for impulse character
KD = Surcharge for the traffic passaging and searching for parking bays in the driving lanes 2.5 * lg (f * B - 9)
f = Parking bays per unit of the reference value
B = Reference value
KStrO = Surcharge for the road surface
B = Reference value
Mechanical Equipment (HVAC Units) Noise
A noise reference level of 67.7 dBA at 3 feet (sound power level of 78.7 dB) was utilized to represent rooftop 50 Ton Carrier HVAC units2. The noise source height for each HVAC unit was assumed at 1 meter above the roof top. Roof top is assumed to be approximately 40 feet (~12.2 meters) above grade. It is assumed that no HVAC equipment will be stored at ground level outside of the proposed building. A total of eight rooftop units were modeled.
MOBILE SOURCE NOISE MODELING
Noise from vehicular traffic was projected using a computer program that replicates the FHWA Traffic Noise Prediction Model (FHWA-RD-77-108). The FHWA model arrives at the predicted noise level through a series of adjustments to the Reference Energy Mean Emission Level (REMEL). Key model parameters and REMEL adjustments are presented below:
Roadway classification (e.g., freeway, major arterial, arterial, secondary, collector, etc.) Roadway active width (distance between the center of the outer most travel lanes on each side of the roadway)
Average Daily Traffic (ADT) Volumes, Travel Speeds, Percentages of automobiles, medium trucks and heavy trucks
Roadway grade and angle of view
Site conditions (e.g., soft vs. hard)
Percentage of total ADT which flows each hour throughout a 24-hour period.
Table 11 shows the roadway volumes, speeds, and site conditions used in the analysis. The following outlines key adjustments made to the REMEL for project site parameter inputs:
Vertical and horizontal distances (sensitive receptor distance from noise source) Noise barrier vertical and horizontal distances (noise barrier distance from sound source and receptor). Traffic noise source spectra
Topography
Traffic noise levels were calculated at the right-of-way based on distance from the centerline of the analyzed roadway. The modeling is theoretical and does not take into account any existing barriers, structures, and/or topographical features that may further reduce noise levels. Therefore, the modeled noise levels are shown
2 MD Acoustics, LLC Noise Measurement Data for RTU –Carrier 50TFQ0006. 24 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
25 19687
for comparative purposes only to show the difference between with and without project conditions. The traffic noise calculation worksheets are included in Appendix F.
GROUNDBORNE VIBRATION MODELING
Groundborne vibration modeling was performed using vibration propagation equations and construction equipment source levels obtained from the FTA Transit Noise and Vibration Impact Assessment Manual (2018).
Table 12 shows typical vibration levels associated with commonly used construction equipment based on data from the FTA.
There are several types of construction equipment that can cause vibration levels high enough to annoy people in the vicinity and/or result in architectural or structural damage to nearby structures and improvements. For example, as shown in Table 12, a vibratory roller could generate up to 0.21 in/sec PPV at and operation of a large bulldozer could generate up to 0.089 PPV at a distance of 25 feet (two of the most vibratory pieces of construction equipment). Groundborne vibration at sensitive receptors associated with this equipment would drop off as the equipment moves away. For example, as the vibratory roller moves further than 100 feet from the sensitive receptors, the vibration associated with it would drop below 0.0026 in/sec PPV. It should be noted that these vibration levels are reference levels and may vary slightly depending upon soil type and specific usage of each piece of equipment.
The fundamental equation used to calculate vibration propagation through average soil conditions and distance is as follows:
PPVequipment = PPVref (25/Drec)n
Where: PPVref = reference PPV at 25ft.
Drec = distance from equipment to receiver in ft.
n = 1.5 (the value related to the attenuation rate through ground)
Groundborne vibration calculations are provided in Appendix G.
25 Equipment Description
Impact
Device?
Acoustical
Use Factor (%)
Spec. Lmax
@ 50ft
(dBA, slow)
Actual
Measured
Lmax @ 50ft
(dBA, slow)
No. of Actual
Data Samples
(Count)
Backhoe No 40 80 78 372
Compressor (air) No 40 80 78 18
Concrete Mixer Truck No 40 85 79 40
Crane No 16 85 81 405
Dozer No 40 85 82 55
Excavator No 40 85 81 170
Forklift2,3 No 50 n/a 61 n/a
Front End Loader No 40 80 79 96
Generator No 50 82 81 19
Generator (<25KVA, VMS signs) No 50 70 73 74
Grader No 40 85 -N/A- 0
Paver No 50 85 77 9
Paving Equipment No 50 85 77 9
Roller No 20 85 80 16
Scraper No 40 85 84 12
Tractor No 40 84 -N/A- 0
Welder/Torch No 40 73 74 5
Notes:
(1) Source: FHWA Roadway Construction Noise Model User's Guide January 2006. (2) Warehouse & Forklift Noise Exposure - NoiseTesting.info Carl Stautins, November 4, 2014 http://www.noisetesting.info/blog/carl-strautins/page-3/ (3) Data provided Leq as measured at the operator. Sound Level at 50 feet is calculated using Inverse Square Law.
Table 10
CA/T Equipment Noise Emissions and Acoustical Usage Factor Database Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
26 Existing
Existing
Plus Project
Minthorn Street In vicinity of the project site 10,050 10,138 40 Hard Riley Street South of Minthorn Street 25,700 25,788 25 Hard Motor-Vehicle Type (7 AM-7 PM) (7 PM-10 PM) (10 PM-7 AM) Automobiles 75.56 13.96 10.49
Medium Trucks 48.91 2.17 48.91
Heavy Trucks 47.30 5.41 47.30
Notes:
Table 11
Roadway Segment
Site
Conditions
Posted
Travel
Speeds
(MPH)
Average Daily Traffic Volume1,2
Project Average Daily Traffic Volumes and Roadway Parameters (2) Project average daily traffic volumes and vehicle mix percentages obtained from the Fleming & Sons Concrete Pumping, Inc. Truck Yard Trip Generation Assessment prepared by Urban Crossroads (November 2, 2023). (3) Existing vehicle percentages are based on the Riverside County Industrial Hygiene Letter for Traffic Noise.
Vehicle Distribution (Light Mix)3
(1) As no existing average daily traffic volumes for Minthorn Street or Riley Street were available, to be conservative, this analysis utilized ambient noise measurements to estimate existing average daily vehicle trips. STNM3 (see Table 1) was used to estimate the existing average daily vehicle trips on both Minthorn Street and Riley Street. It should be noted, that the modeled noise levels for this analysis are shown for comparative purposes only to show the difference between with and without project conditions.
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
27 PPV at 25 ft, in/sec Approximate Lv* at 25 ft
upper range 1.518 112
typical 0.644 104
upper range 0.734 105
typical 0.170 93
0.202 94
in soil 0.008 66
in rock 0.017 75
0.210 94
0.089 87
0.089 87
0.089 87
0.076 86
0.035 79
0.003 58
Table 12
Equipment
Pile Driver (impact)
Pile Driver (sonic)
Caisson Drilling
clam shovel drop (slurry wall)
Hydromill (slurry wall)
Vibratory Roller
Hoe Ram
Large Bulldozer
Jackhammer
Small Bulldozer
Source: Federal Transit Administration: Transit Noise and Vibration Impact Assessment Manual, 2018. *RMS velocity in decibels, VdB re 1 micro-in/sec
Construction Equipment Vibration Source Levels
Loaded Trucks
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
28 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
29 19687
6. NOISE AND VIBRATION IMPACTS
This section analyzes the significance of project-related noise and groundborne vibration impacts relative to standards established by the City of Lake Elsinore and other applicable agencies in the context of CEQA.
Appendix G of the California Environmental Quality Act Guidelines (Title 14, Division 6, Chapter 3 of the California Code of Regulations) includes an environmental checklist that identifies issues upon which findings of significance should be made. The CEQA Environmental Checklist Appendix G, XIII. Noise, requires determination if the project would result in:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
b) Generation of excessive groundborne vibration or groundborne noise levels? c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the area to excessive noise levels?
NOISE IMPACTS
Would the project result in:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Finding: Less Than Significant
In relation to the Environmental Checklist noise issue “a”, applicable standards established by the City of Lake Elsinore can be categorized into the following areas:
Construction Noise
Stationary Source Noise
Mobile Source Noise
Construction Noise
Construction noise is regulated within Section 17.176.080 of the City of Lake Elsinore Municipal Code (see Regulatory Setting section of this report). Accordingly, the project would result in a significant impact if:
Project construction occurs outside the weekday hours of 7:00 AM and 7:00 PM or at any time on weekends or holidays; or if project construction noise exceeds the following (see Table 9):
o At a place of business: 85 dBA from mobile equipment and 75 dBA from stationary equipment, o At a single-family residence: 75 dBA for mobile equipment and 60 dBA for stationary equipment, o At a multi-family residential building: 80 dBA for mobile equipment and 65 dBA for stationary equipment.
Project construction noise levels at nearby sensitive receptors were calculated using the FTA methodology.
Modeled locations are shown on Figure 6. Construction noise modeling worksheets for each phase are provided in Appendix D. Anticipated noise levels during each construction phase are presented in Table 13. 29 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
30 19687
As shown in Table 13, modeled construction noise levels reach up to 66.3 dBA L eq at the nearest residential property line to the northeast (131 Minthorn Street), up to 67.4 dBA L eq at the nearest commercial property line to the northwest, 68.8 dBA L eq at the nearest commercial property line to the northeast, 81 dBA L eq at the nearest industrial property line to the east, 65.4 dBA L eq at the nearest residential property line to the east, 62.2 dBA L eq at the nearest residential property line to the southeast, 62.6 dBA L eq at the nearest residential property line to the southwest, 72.9 dBA L eq at the nearest commercial property line to the west,
69.1 dBA Leq at the nearest single-family residential property line to the west, and 66.9 dBA Leq at the nearest multi-family residential property line to the west of the project site.
The project will comply with the allowed hours for construction specified in Section 17.176.080 of the City of Lake Elsinore Municipal Code; and based on the modeled construction noise levels (see Table 13), project construction noise levels will not exceed the applicable City mobile equipment noise thresholds at any of the modeled receptors.
Project Operational Noise (Onsite)
Interior and exterior noise standards for limiting noise pollution from one property to another are provided in the City of Lake Elsinore Municipal Code (see Table 7 and Table 8). Although not typically considered as “noise sensitive” land uses, noise standards are provided for commercial, industrial, and public land uses in addition to residential land uses. It should be noted that neither the General Plan nor the Municipal Code make clear as to whether the standards apply to existing land uses, the zone, or to the General Plan land use designation.
Existing sensitive receptors (existing residential land uses) in the project area are shown in Figure 6. The zoning of the project area is shown in Figure 7. For the purposes of this analysis, the more conservative assumption was utilized (existing land use). It should also be noted that per footnote 2 of Table 7, noise standards were adjusted based on existing measured noise levels.
Accordingly, the project would result in a significant impact if:
Onsite operational would result in a significant impact if it exceeds any of the criteria provided below:
Land Use Exterior
Daytime Leq
Exterior
Nighttime Leq
Interior
Daytime Leq
Interior
Nighttime Leq
Single family
residential 50 40
Multiple family
residential 50 45 35 45
Limited
Commercial/Office 60 55
General Commercial 65 60
Light Industrial 70 70
Heavy Industrial 75 75
Onsite operational noise levels at nearby land uses were modeled using the SoundPLAN acoustical model.
SoundPLAN modeling worksheets are provided in Appendix E. A description of each noise source and model parameters are discussed in Section 5 of this report.
A conservative assumption was made that the total number of daily truck trips would occur during the modeled hour. As shown in Table 14, and on Figure 8 and Figure 9, project operational noise is expected to range between 35.8 and 43.9 dBA Leq at nearby land uses and will not exceed the applicable stationary noise standards. This impact would be less than significant. No mitigation is required.
Project Operational Noise (Offsite)
30 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
31 19687
California courts have rejected use of what is effectively a single “absolute noise level” threshold of significance (e.g., exceed 65 dBA CNEL) on the grounds that the use of such a threshold fails to consider the magnitude or severity of increases in noise levels attributable to the project in different environments (see King and Gardiner Farms, LLC v. County of Kern (2020) 45 Cal.App.5th 814). California courts have also upheld the use of “ambient plus increment” thresholds for assessing project noise impacts as consistent with CEQA, noting however, that the severity of existing noise levels should not be ignored by incorporating a smaller incremental threshold for areas where existing ambient noise levels were already high (see Mission Bay Alliance v. Office of Community Investment and Infrastructure (2016) 6 Cal.App.5th 160).
It is widely accepted that the average healthy human ear can barely perceive changes of 3 dBA in an outdoor environment and that a change of 5 dBA is readily perceptible.3 Therefore, considering relevant case law, the project would result in a significant impact if:
The addition of project trips on surrounding roadways causes noise levels to increase by:
o 5 dBA where the existing ambient noise level is less than or equal to a CNEL of 60 dBA; or, o 3 dBA where the existing ambient noise level is a CNEL of 60 dBA to 65 dBA; or o 1.5 dBA where the existing ambient noise level is greater than or equal to a 65 dBA CNEL.
Mobile Source Noise
Roadway noise levels were calculated at roadways included in the Fleming & Sons Concrete, Pumping, Inc. Truck Yard Trip Generation Assessment (Ganddini Group, Inc., November 2, 2023) based on the FHWA Traffic Noise Prediction Model methodology. During operation, the proposed project is expected to generate approximately 88 average daily trips with 7 trips during the AM peak-hour and 17 trips during the PM peak-hour. Roadway noise levels were calculated for the following scenarios:
Existing (without Project): This scenario refers to existing year traffic noise conditions. Existing Plus Project: This scenario refers to existing year plus project traffic noise conditions.
Table 15 shows the change in existing roadway noise levels with the addition of project-generated operational trips. FHWA Traffic Noise Prediction Model calculation worksheets are provided in Appendix F.
As shown in Table 15, modeled existing traffic noise levels range between 71.14 and 72.18 dBA CNEL and the modeled Existing Plus Project traffic noise levels range between 71.24 and 72.24 dBA CNEL at the right- of-way of each study roadway segment.
In no case will project generated vehicle traffic result in an increase greater than 1.5 dB, and therefore, will not result in substantial increases in ambient noise levels along affected road segments (see Table 15). This impact is less than significant; no mitigation is required.
Construction Source Noise
Construction truck trips would occur throughout the construction period. Given the project site’s proximity to the 15 Freeway, it is anticipated that vendor and/or haul truck traffic would take the most direct route to the appropriate freeway ramps.
3 California Department of Transportation’s Technical Noise Supplement to the Traffic Noise Analysis Protocol (2013) 31 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
32 19687
Minthorn Street currently handles approximately 10,050 average daily vehicle trips. 4 According to the CalEEMod modeling in the Air Quality and Greenhouse Gas Assessment prepared for the proposed project (Urban Crossroads, 2023), the greatest number of construction-related vehicle trips per day would be during the grading phase of construction at up to approximately 88 vehicle trips per day (10 worker and 78.3 hauling trips per day). Therefore, vehicle traffic generated during project construction is nominal relative to existing roadway volumes and would not result in the doubling of traffic volume necessary to increase noise levels by 3 dBA. The project impact is less than significant; no mitigation is required.
GROUNDBORNE VIBRATION IMPACTS
Would the project result in:
b) Generation of excessive groundborne vibration or groundborne noise levels?
Finding: Less Than Significant
In relation to the Environmental Checklist noise issue “b”, the City of Lake Elsinore Municipal Code Section
17.176.080 states that operating or permitting the operation of any device that creates a vibration which is above the vibration perception threshold of any individual at or beyond the property boundary of the source if on private property or at 150 feet (46 meters) from the source if on a public space or public right-of-way is prohibited. However, the City does not specify a numerical threshold of significance concerning groundborne vibration. In the absence of a City-established numerical threshold, groundborne vibration impacts are based on guidance from the Transportation and Construction Vibration Guidance Manual (California Department of Transportation, 2020) (see Regulatory Setting section). Accordingly, the project would result in a significant impact if:
Groundborne vibration levels generated by the project have the potential to cause architectural damage at nearby buildings by exceeding the following PPV:
□ 0.08 in/sec at extremely fragile historic buildings, ruins, ancient monuments □ 0.10 in/sec at fragile buildings
□ 0.25 in/sec at historic and some old buildings
□ 0.30 in/sec at older residential structures
□ 0.50 in/sec at new residential structures and modern industrial/commercial buildings. Groundborne vibration levels generated by the project have the potential to cause annoyance to people living or working in nearby buildings by exceeding a PPV of 0.04 in/sec.
Groundborne vibration modeling worksheets are provided in Appendix G.
Based on the groundborne vibration modeling, use of a vibratory roller is expected to generate a PPV of 0.104 in/sec and use of a bulldozer is expected to generate a PPV of 0.044 in/sec at the closest off-site building, a commercial use located approximately 40 feet east of the project site ( Table 16). Therefore, groundborne vibration generated by project construction would not exceed the levels necessary to cause architectural damage.
As shown in Table 16, at all modeled sensitive uses, groundborne vibration would not exceed the annoyance threshold of a PPV of 0.04 in/sec. Therefore, groundborne vibration generated by project construction would not exceed the levels necessary to cause annoyance to persons living or working in nearby buildings. The project impact is less than significant; no mitigation is required.
4 As no existing average daily traffic volumes for Minthorn Street were available, to be conservative, this analysis utilized ambient noise measurements to estimate existing average daily vehicle trips. STNM3 (see Table 1) was used to estimate the existing average daily vehicle trips on Minthorn Street.
32 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
33 19687
The most substantial sources of groundborne vibration during post-construction project operations will include the movement of passenger vehicles and trucks on paved and generally smooth surfaces. Loaded trucks generally have a PPV of 0.076 at a distance of 25 feet (Caltrans 2020), which is a substantially lower PPV than that of a vibratory roller (0.210 in/sec PPV at 25 feet). Therefore, groundborne vibration levels generated by project operation would not exceed those modeled for project construction.
AIR TRAFFIC IMPACTS
Would the project result in:
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the area to excessive noise levels?
Finding: No Impact
The closest airport to the project site is Skylark Airport, with airport runways located as close as approximately
3.06 miles to the southeast of the project site. The City of Lake Elsinore General Plan sates that Skylark Airport is a privately owned airport which provides glider and skydiving opportunities with a gravel and sand runway surface, which does not permit optimal conditions for frequent and convenient airport operations. Therefore, as Skylark Airport is further than two miles from the project site and is a small private airport, the proposed project would not expose people residing in or working in the area to excessive noise levels. There is no impact, and no mitigation is required.
33 Table 13 (1 of 2)
Construction Noise Levels (dBA Leq)
Phase Receptor Location
Construction
Noise
Levels
(dBA Leq)
Applicable
City Mobile
Source
Noise
Threshold
(dBA Leq)
Exceeds City
Mobile
Source Noise
Threshold?
Residential to the east (131 W Minthorn St) 65.0 75 No
Commercial to Northwest (Mr. Nice Guy Dispensary, 311 W Minthorn St) 66.1 85 No Commercial to Northeast (233 W Minthorn St) 67.6 85 No
Industrial to East (522 N Riley St) 79.7 85 No
Residential to East (520 N Spring St) 64.2 75 No
Residential to Southeast (109 W Flint St) 61.0 75 No
Residential to Southwest (416 N Langstaff St) 61.3 75 No Commercial to West (Lake Elsinore Public Works, 521 N Langstaff St) 71.6 85 No Residential to West (513 N Langstaff St) 67.9 75 No
Residential to West (508 N Langstaff St) 65.6 80 No
Residential to the east (131 W Minthorn St) 66.3 75 No
Commercial to Northwest (Mr. Nice Guy Dispensary, 311 W Minthorn St) 67.4 85 No Commercial to Northeast (233 W Minthorn St) 68.8 85 No
Industrial to East (522 N Riley St) 81.0 85 No
Residential to East (520 N Spring St) 65.4 75 No
Residential to Southeast (109 W Flint St) 62.2 75 No
Residential to Southwest (416 N Langstaff St) 62.6 75 No Commercial to West (Lake Elsinore Public Works, 521 N Langstaff St) 72.9 85 No Residential to West (513 N Langstaff St) 69.1 75 No
Residential to West (508 N Langstaff St) 66.9 80 No
Residential to the east (131 W Minthorn St) 63.7 75 No
Commercial to Northwest (Mr. Nice Guy Dispensary, 311 W Minthorn St) 64.8 85 No Commercial to Northeast (233 W Minthorn St) 66.2 85 No
Industrial to East (522 N Riley St) 78.4 85 No
Residential to East (520 N Spring St) 62.8 75 No
Residential to Southeast (109 W Flint St) 59.6 75 No
Residential to Southwest (416 N Langstaff St) 60.0 75 No Commercial to West (Lake Elsinore Public Works, 521 N Langstaff St) 70.3 85 No Residential to West (513 N Langstaff St) 66.5 75 No
Residential to West (508 N Langstaff St) 64.3 80 No
Site
Preparation
Grading
Building
Construction
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
34 Table 13 (2 of 2)
Construction Noise Levels (dBA Leq)
Phase Receptor Location
Construction
Noise
Levels
(dBA Leq)
Applicable
City Mobile
Source
Noise
Threshold
(dBA Leq)
Exceeds City
Mobile
Source Noise
Threshold?
Residential to the east (131 W Minthorn St) 63.4 75 No
Commercial to Northwest (Mr. Nice Guy Dispensary, 311 W Minthorn St) 64.5 85 No Commercial to Northeast (233 W Minthorn St) 66.0 85 No
Industrial to East (522 N Riley St) 78.2 85 No
Residential to East (520 N Spring St) 62.6 75 No
Residential to Southeast (109 W Flint St) 59.4 75 No
Residential to Southwest (416 N Langstaff St) 59.7 75 No Commercial to West (Lake Elsinore Public Works, 521 N Langstaff St) 70.1 85 No Residential to West (513 N Langstaff St) 66.3 75 No
Residential to West (508 N Langstaff St) 64.0 80 No
Residential to the east (131 W Minthorn St) 54.4 75 No
Commercial to Northwest (Mr. Nice Guy Dispensary, 311 W Minthorn St) 55.5 85 No Commercial to Northeast (233 W Minthorn St) 56.9 85 No
Industrial to East (522 N Riley St) 69.1 85 No
Residential to East (520 N Spring St) 53.5 75 No
Residential to Southeast (109 W Flint St) 50.3 75 No
Residential to Southwest (416 N Langstaff St) 50.7 75 No Commercial to West (Lake Elsinore Public Works, 521 N Langstaff St) 61.0 85 No Residential to West (513 N Langstaff St) 57.2 75 No
Residential to West (508 N Langstaff St) 55.0 80 No
(1) Construction noise worksheets are provided in Appendix D.
Notes:
Paving
Architectural
Coating
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
35 Affected
Receptor1 Reeiving Land Use Category Ordinance Time Period Ordinance Noise Level Limits (dBA)2
Measured Noise Levels
Daytime/Nighttime
Adjusted Noise Level
Limits3
Modeled Operational
Noise Level (dBA, Leq)
Exceeds Applicable
Standard (Y/N)
10:00 PM to 7:00 AM 40 53 55 N
7:00 AM 10 10:00 PM 50 54 55 N
10:00 PM to 7:00 AM 40 53 65 N
7:00 AM 10 10:00 PM 50 54 55 N
10:00 PM to 7:00 AM 40 68 70 N
7:00 AM 10 10:00 PM 50 54 55 N
10:00 PM to 7:00 AM 40 68 70 N
7:00 AM 10 10:00 PM 50 54 55 N
R5 Light Industrial Anytime 70 68 70 43.9 N
10:00 PM to 7:00 AM 60 68 70 N
7:00 AM 10 10:00 PM 65 54 65 N
10:00 PM to 7:00 AM 40 50 50 N
7:00 AM 10 10:00 PM 50 54 55 N
10:00 PM to 7:00 AM 45 50 50 N
7:00 AM 10 10:00 PM 50 54 55 N
Source: City of Lake Elsinore Municipal Code, 17.176.060 Exterior Noise Limits.
Notes:
1. See Figure 6.
2. Levels Not to be Exceeded More than 30 Minutes in Any Hour.
R7 Single-Family Residential
R8 Multiple Dwelling Residential
3. If the measured ambient level differs from that permissible within any of the fast four noise limit categories above, the allowable noise exposure standard shall be adjusted in five dB increments in each category as appropriate to encompass or reflect said ambient noise level.
R3 Single-Family Residential
R4 Single-Family Residential
R6 General Commercial
Table 14
Project Compliance with City of Lake Elsinore Stationary Noise Standards R1 Single-Family Residential
R2 Single-Family Residential
37.8 36.5
41.2 39.6
39.6 35.8
43.3 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
36 Existing
Without
Project at
right-of-way
Existing Plus
Project at
right-of-way
Change in
Noise Level
Increase of
1.5 dB or
More?
Minthorn Street In vincinity of the project site 25 71.14 71.24 0.10 No Riley Street South of Minthorn Street 20 72.18 72.24 0.06 No Notes:
(2) Distance from centerline to right-of-way estimated based on Google Earth Pro (2021).
Distance from
roadway
centerline to
right-of-way
(feet)2
Increase in Existing Noise Levels Along Roadways as a Result of Project (dBA CNEL) Table 15
(1) Exterior noise levels calculated 5 feet above pad elevation, perpendicular to subject roadway.
Roadway Segment
Modeled Noise Levels (dBA CNEL)1
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
37 Receptor Location
Distance from
Property Line to
Nearest
Structure (feet) Equipment
Vibration
Level
PPV (in/sec)
Threshold
Exceeded?1
225 Vibratory Roller 0.008 No
225 Large Bulldozer 0.003 No
363 Vibratory Roller 0.004 No
363 Large Bulldozer 0.002 No
352 Vibratory Roller 0.004 No
352 Large Bulldozer 0.002 No
322 Vibratory Roller 0.005 No
322 Large Bulldozer 0.002 No
40 Vibratory Roller 0.104 No
40 Large Bulldozer 0.044 No
152 Vibratory Roller 0.014 No
152 Large Bulldozer 0.006 No
43 Vibratory Roller 0.093 No
43 Large Bulldozer 0.039 No
Notes:
Architectural Damage Analysis
Construction Vibration Levels at the Nearest Receptors
Table 16
(1) Caltrans identifies the threshold at which there is a risk of architectural damage to older residential structures as a PPV of 0.3 in/sec and to modern industrial/commercial buildings as a PPV of 0.5 in/sec (see Table 3). In addition, vibration becomes distinctly perceptible to sensitive uses at 0.04 PPV (in/sec).
Commercial to East (522 N Riley Street, Lake Elsinore)
Commercial to Northeast (233 Minthorn Street, Lake
Elsinore)
Commercial to North (311 Minthorn Street, Lake
Elsinore)
Commercial/Public Works to West (521 N Langstaff
Street, Lake Elsinore)
Single-Family Residential to West (513 N Langstaff
Street, Lake Elsinore)
Multi-Family Residential to West (508 N Langstaff Street, Lake Elsinore)
Single-Family Residential to Southwest (416 N Langstaff Street, Lake Elsinore)
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
38 Figure 6
Existing Sensitive Receptors
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
N
15 MAIN ST
SPRING ST
RILEY ST
FLINT ST
POE ST
LANGSTAFF ST
FLINT ST
Site
MINTHORN ST
521 N Langstaff St
513 N Langstaff St
508 N Langstaff St
416 N Langstaff St
109 W Flint St
520 N Spring St
522 N Riley St
311 W Minthorn St
233 W Minthorn St
131 W Minthorn St
39 Figure 7
Zoning
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
N
15 MAIN ST
SPRING ST
RILEY ST
FLINT ST
POE ST
LANGSTAFF ST
FLINT ST
Site
MINTHORN ST
M1 - Limited Manufacturing
Legend
C2 - General Commercial
SP - Specific Plan
PI - Public/Institutional
R3 - High Density Residential
40 Figure 8
Operational Noise Levels (dBA Leq)
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
41 Figure 9
Operational Noise Contours (dBA Leq)
Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
19687
42 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
43 19687
7. REFERENCES
California, State of, Department of Transportation
2002 Transportation Related Earthborne Vibrations (California Department of Transportation Experiences), Technical Advisory, Vibration TAV-02-01-R9601. February 20.
2020 Transportation and Construction Vibration Manual. April.
Environmental Protection Agency
1974 "Information on Levels of Environmental Noise Requisite to Protect Public Health And Welfare with an Adequate Margin of Safety," EPA/ONAC 550/9-74-004, March 1974.
Federal Transit Administration
2006 Transit Noise and Vibration Impact Assessment. Typical Construction Equipment Vibration Emissions.
FTAVA-90-1003-06.
2018 Transit Noise and Vibration Impact Assessment Manual. Typical Construction Equipment Vibration Emissions.
Lake Elsinore, City of
2011 Lake Elsinore General Plan. December 13.
2023 Lake Elsinore Municipal Code. June 13.
Office of Planning and Research
2017 State of California General Plan Guidelines
Riverside, County of
2001 General Plan, Chapter 4, Figure C-3 "Link Volume Capacities/Level of Service for Riverside County Roadways".
2009 County of Riverside Industrial Hygiene Guidelines for Determining and Mitigating Traffic Noise Impacts to Residential Structures and County.
Stautins, Carl
2014 Warehouse & Forklift Noise Exposure – Noise Testing. November 4, 2014.
Urban Crossroads
2023 Fleming & Sons Concrete Pumping, Inc. Truck Yard Trip Generation Assessment. November 2.
U.S. Department of Transportation
2006 FHWA Roadway Construction Noise Model User’s Guide. January.
43 Fleming Concrete Pumping Truck Yard
Noise Impact Analysis
44 19687
APPENDICES
Appendix A List of Acronyms
Appendix B Definitions of Acoustical Terms
Appendix C Noise Measurement Field Worksheets
Appendix D Construction Noise Model Worksheets
Appendix E SoundPLAN Worksheets
Appendix F FHWA Traffic Noise Model Worksheets
Appendix G Groundborne Vibration Worksheets
Apx-1
APPENDIX A
LIST OF ACRONYMS
Apx-2
Term Definition
ADT
ANSI
CEQA
CNEL
D/E/N
dB
dBA or dB(A)
dBA/DD
dBA Leq
EPA
FHWA
L02,L08,L50,L90
DNL
Leq(x)
Leq
Lmax
Lmin
Lp
LOS C
Lw
OPR
PPV
RCNM
REMEL
RMS
Average Daily Traffic
American National Standard Institute
California Environmental Quality Act
Community Noise Equivalent Level
Day / Evening / Night
Decibel
Decibel "A-Weighted"
Decibel per Double Distance
Average Noise Level over a Period of Time
Environmental Protection Agency
Federal Highway Administration
A-weighted Noise Levels at 2 percent, 8 percent, 50 percent, and 90 percent, respectively, of the time period
Day-Night Average Noise Level
Equivalent Noise Level for '"x" period of time
Equivalent Noise Level
Maximum Level of Noise (measured using a sound level meter) Minimum Level of Noise (measured using a sound level meter) Sound Pressure Level
Level of Service C
Sound Power Level
California Governor's Office of Planning and Research
Peak Particle Velocities
Road Construction Noise Model
Reference Energy Mean Emission Level
Root Mean Square
Apx-3
APPENDIX B
DEFINITIONS OF ACOUSTICAL TERMS
Apx-4
Term Definition
Ambient Noise
Level
The all-encompassing noise environment associated with a given environment, at a specified time, usually a composite of sound from many sources, at many directions, near and far, in which usually no particular sound is dominant.
A-Weighted Sound
Level, dBA
The sound level obtained by use of A-weighting. The A-weighting filter de-emphasizes the very low and very high frequency components of the sound in a manner similar to the frequency response of the human ear.
CNEL
Community Noise Equivalent Level. CNEL is a weighted 24-hour noise level that is obtained by adding five decibels to sound levels in the evening (7:00 PM to 10:00 PM), and by adding ten decibels to sound levels at night (10:00 PM to 7:00 AM). This weighting accounts for the increased human sensitivity to noise during the evening and nighttime hours.
Decibel, dB
A logarithmic unit of noise level measurement that relates the energy of a noise source to that of a constant reference level; the number of decibels is 10 times the logarithm (to the base 10) of this ratio.
DNL, Ldn
Day Night Level. The DNL, or Ldn is a weighted 24-hour noise level that is obtained by adding ten decibels to sound levels at night (10:00 PM to 7:00 AM). This weighting accounts for the increased human sensitivity to noise during the nighttime hours.
Equivalent
Continuous Noise
Level, Leq
A level of steady state sound that in a stated time period, and a stated location, has the same A-weighted sound energy as the time-varying sound.
Fast/Slow Meter
Response
The fast and slow meter responses are different settings on a sound level meter. The fast response setting takes a measurement every 100 milliseconds, while a slow setting takes one every second.
Frequency, Hertz In a function periodic in time, the number of times that the quantity repeats itself in one second (i.e., the number of cycles per second).
L02, L08, L50, L90 The A-weighted noise levels that are equaled or exceeded by a fluctuating sound level, 2 percent, 8 percent, 50 percent, and 90 percent of a stated time period, respectively.
Lmax, Lmin
Lmax is the RMS (root mean squared) maximum level of a noise source or environment measured on a sound level meter, during a designated time interval, using fast meter response. Lmin is the minimum level.
Offensive/
Offending/Intrusive
Noise
The noise that intrudes over and above the existing ambient noise at a given location.
The relative intrusiveness of sound depends on its amplitude, duration, frequency, and time of occurrence, and tonal information content as well as the prevailing ambient noise level.
Root Mean Square
(RMS)
A measure of the magnitude of a varying noise source quantity. The name derives from the calculation of the square root of the mean of the squares of the values. It can be calculated from either a series of lone values or a continuous varying function.
Apx-5
APPENDIX C
NOISE MEASUREMENT FIELD WORKSHEETS
Apx-6
Noise Measurement
Field Data
Project Name: Fleming Concrete Pumping Truck Yard, Lake Elsinore Date:
Project #:
Noise Measurement #: Technician:
Weather: Settings: SLOW FAST
Temperature: 68 deg F Wind: 2 mph Humidity: 20% Terrain:
Start Time: 12:23 PM End Time: 12:38 PM Run Time:
Leq: 53 dB Traffic ambiance from vehicles traveling along the 15 Fwy.
Lmax 57.6 dB Traffic ambiance from vehicles on other roads.
L2 55.9 dB Some residential ambiance, distant overhead air traffic. Bird song.
L8 54.8 dB Distant jack hammer in operation.
L25 53.6 dB
L50 52.7 dB
NOISE METER: CALIBRATOR:
MAKE: MAKE:
MODEL: MODEL:
SERIAL NUMBER: SERIAL NUMBER:
FACTORY CALIBRATION DATE:
FIELD CALIBRATION DATE:
11/18/202111/17/2021
11/28/2023
FACTORY CALIBRATION DATE:
Larson Davis
LXT1
3099
Larson Davis
CA 250
2723
Primary Noise Source:
Secondary Noise Sources:
Flat
Site Description (Type of Existing Land Use and any other notable features):
SoundTrack LXT Class 1
Clear skies, sunshine. Sunset 4:41 PM.
Larson Davis CA 250
Measurement Site: Just northeast of the residential use located at 314 N Langstaff St.
Adjacent: 15 Fwy (running NW-SE) ~1,400' NE. Vacant land to north and east with commercial uses further north, residential uses to south, vacant land to west with Langstaff St and residential uses further west.
November 28, 2023
Ian Edward Gallagher
Nearest Address or Cross Street: 416 N Langstaff St, Lake Elsinore, CA 92530 STNM1 Run Time: 15 minutes ( 1 x 15 minutes )
19687
Apx-7
Noise Measurement
Field Data
PHOTOS:
STNM1 looking SW towards backyard of residence 416 N Langstaff Street, STNM1 looking WNW across N Langstaff Street (~160') towards residence Lake Elsinore. 417 N Langstaff Street (~210').
Apx-8
Summary
File Name on Meter LxT_Data.363.s
File Name on PC
Serial Number 3099
Model SoundTrack LxT®
Firmware Version 2.404
User Ian Edward Gallagher
Location STNM1 33°40'32.43"N 117°19'41.85"W
Job Description 15 minute noise measurement ( 1 x 15 minutes ) Note
Measurement
Start 2023-11-28 12:23:07
Stop 2023-11-28 12:38:07
Duration 00:15:00.0
Run Time 00:15:00.0
Pause 00:00:00.0
Pre-Calibration 2023-11-28 12:22:37
Post-Calibration None
Calibration Deviation ---
Overall Settings
RMS Weight A Weighting
Peak Weight A Weighting
Detector Slow
Preamplifier PRMLxT1L
Microphone Correction Off
Integration Method Linear
OBA Range Normal
OBA Bandwidth 1/1 and 1/3
OBA Frequency Weighting C Weighting
OBA Max Spectrum At LMax
Overload 122.5 dB
Results
LAeq 53.0
LAE 82.5
EA 19.78451 µPa²h
EA8 633.1042 µPa²h
EA40 3.165521 mPa²h
LApeak (max) 2023-11-28 12:24:51 86.2 dB
LASmax 2023-11-28 12:28:20 57.6 dB
LASmin 2023-11-28 12:23:28 49.0 dB
Statistics
LCeq 64.6 dB LA2.00 55.9 dB
LAeq 53.0 dB LA8.00 54.8 dB
LCeq - LAeq 11.7 dB LA25.00 53.6 dB
LAIeq 53.9 dB LA50.00 52.7 dB
LAeq 53.0 dB LA66.60 52.1 dB
LAIeq - LAeq 0.9 dB LA90.00 50.9 dB
Overload Count 0
LxT_0003099-20231128 122307-LxT_Data.363.ldbin
Ganddini Project#19687 Fleming Concrete Pumping Truck Yard, Lake Elsinore.
Apx-9
/0 /1 /2 /3 /4 /5 /1 /6/1 /7 /8 □ /10 /1 /11 /12 /5 /8
/13 /14 /15 /16 /17 /18 □ /20 /21 /22/22/23 /17 /24
/0 /1 /8 /1 /5 /25 /3 □ /26 /27 /28 /1 □ /29 /2 /6/1/30 /31 /32 /33 /34 /2 /8 /2 /35 /36 /37 /36 /35 /3/38 /12 /6/11 /4 /8 /1 /5 /25 /3 □ /26 /27 /28 /1 □ /29 /2 /6/1/30 /31 /32 /33 /39 /39 /39 /36 /39 /40 /40 /41 /42 /39 /42 /36 /43 /43 /42 /44 □ /43 /42 /42 /36 /39 /45 /41 /30 /31 /32 /33 /34 /2 /8 /2 /35 /36 /37 /36 /35 /28 /46 /47 /27 /7 /0 /1 /8 /1 /5 /30 /31 /32 /43 /39 /39 /39 /36 /39 /40 /40 /26 /27 /5 /6/48 /2 /5 /1/42 /35 /49 /39 /49
/50 /3 /1 /5 /51 /2 /7 □ /52 /46 /48 /2 /5 /46 □ /53 /2 /28 /28 /2 /54 /55 /1 /5 /30 /12 /56 /2 /8 /27 /12 /7/57 /32 /29 /0 /43 □ /36 /36 /58 /49 /39 /25 /36 /42 /35 /49 /36 /59 /29 □ /43 /43 /45 /58 /43 /40 /25 /49 /43 /35 /44 /60 /59 /61 /62 /12 /47 □ /34 /1 /3 /56 /5 /27 /11 /8 /27 /12 /7/43 /60 □ /6/27 /7 /4 /8 /1 □ /7 /12 /27 /3 /1 □ /6/1 /2 /3 /4 /5 /1 /6/1 /7 /8 □ /63 □ /43 □ /31 □ /43 /60 □ /6/27 /7 /4 /8 /1 /3 □ /64 /29 /12 /8 /1 /53 /2 /7 /46 /46 /27 /7 /27 □ /65 /5 /12 /66 /1 /56 /8 /67 /43 /40 /37 /44 /45 □ /26 /28 /1 /6/27 /7 /54 □ /38 /12 /7 /56 /5 /1 /8 /1 □ /65 /4 /6/11 /27 /7 /54 □ /32 /5 /4 /56 /68 □ /69 /2 /5 /46 /70 □ /30 /2 /68 /1 □ /52 /28 /3 /27 /7 /12 /5 /1 /35 /57 /8 /2 /5 /8 □ /32 /27 /6/1/42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /42 /71 /42 /36 /71 /39 /45/34 /4 /5 /2 /8 /27 /12 /7/39 /71 /43 /60 /71 /39 /39 /35 /39 /52 /7 /46 □ /32 /27 /6/1/42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /42 /71 /36 /44 /71 /39 /45/10 /4 /7 □ /32 /27 /6/1/39 /71 /43 /60 /71 /39 /39 /35 /39/65 /2 /4 /3 /1 □ /32 /27 /6/1/39 /71 /39 /39 /71 /39 /39 /35 /39 □
/13 /14 /72 /21 /73 /18 /72
/74 /75 /1 /5 /2 /28 /28 □ /0 /1 /8 /5 /27 /56 /3
/30 /76 /1 /77 /60 /36 /35 /39 □ /46 /78
/30 /76 /52 /44 /42 /35 /60 □ /46 /78/57 /52 /76 /41 /41 /41 □ /46 /78 /52 /76 /43 /40 /35 /44 □ /79 /65 /2 /80 /55/30 /76 /26 /32 /0 /60 /60 /49 /35 /40 □ /46 /78 /52 /76 /44 /37 /36 /36 /35 /43 □ /79 /65 /2 /80 /55
/52 /76 /49 /39 /36 /35 /42 □ /6/65 /2 /80 /55
/30 /76 /11 /1 /2 /68 /44 /37 /35 /42 □ /46 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /42 /71 /42 /49 /71 /60 /43 /30 /76 /57 /6/2 /31 /60 /45 /35 /37 □ /46 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /42 /71 /42 /44 /71 /42 /39 /30 /76 /57 /6/27 /7 /49 /40 /35 /39 □ /46 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /42 /71 /42 /36 /71 /42 /44 /30 /76 /1 /77 /60 /36 /35 /39 □ /46 /78
/30 /38 /1 /77 /37 /49 /35 /37 □ /46 /78/30 /38 /1 /77□ /41 □ /30 /76/1 /77 /43 /43 /35 /45 □ /46 /78 /30 /76 /51 /1 /77 /60 /36 /35 /40 □ /46 /78/30 /76 /51 /1 /77□ /41 □ /30 /76/1 /77 /39 /35 /40 □ /46 /78 /52 /31 /56 /1 /1 /46 /2 /7 /56 /1 /3 /38 /12 /4 /7 /8 /34 /4 /5 /2 /8 /27 /12 /7 /30 /76 /57 □ /81 □ /37 /60 /35 /39 □ /46 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /30 /76 /57 □ /81 □ /44 /60 /35 /39 □ /46 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /30 /76 /11 /1 /2 /68 □ /81 □ /43 /36 /60 /35 /39 □ /46 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /30 /76 /11 /1 /2 /68 □ /81 □ /43 /36 /45 /35 /39 □ /46 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /30 /76 /11 /1 /2 /68 □ /81 □ /43 /49 /39 /35 /39 □ /46 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /38 /12 /6/6/4 /7 /27 /8 /82 □ /29 /12 /27 /3 /1 /30 /34 /29 /30 /34 /2 /82 /30 /29 /27 /54 /55 /8 /41 /41 /41 □ /46 /78 /41 /41 /41 □ /46 /78 /39 /35 /39 □ /46 /78 /30 /34 /52 /29 /30 /34 /2 /82 /30 /52 /75 /1 /30 /29 /27 /54 /55 /8 /41 /41 /41 □ /46 /78 /41 /41 /41 □ /46 /78 /41 /41 /41 □ /46 /78 /41 /41 /41 □ /46 /78 /76 /7 /82 □ /34 /2 /8 /2 /76 /38 /83
/30 /1 /75 /1 /28 /32 /27 /6/1 □ /57 /8 /2 /6/11 /30 /1 /75 /1 /28 /32 /27 /6/1 □ /57 /8 /2 /6/11 /30 /1 /75 /1 /28 /32 /27 /6/1 □ /57 /8 /2 /6/11 /30 /1 /77 /60 /36 /35 /39 □ /46 /78 /37 /49 /35 /37 □ /46 /78 /41 /41 /41 □ /46 /78 /30 /3 /63 /6/2 /31 /64 /60 /45 /35 /37 □ /46 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /42 /71 /42 /44 /71 /42 /39 /41 /41 /41 □ /46 /78 /41 /41 /41 □ /46 /78 /30 /57 /63 /6/27 /7 /64 /49 /40 /35 /39 □ /46 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /42 /71 /42 /36 /71 /42 /44 /41 /41 /41 □ /46 /78 /41 /41 /41 □ /46 /78 /30 /65 /1 /2 /68 /63 /6/2 /31 /64 /44 /37 /35 /42 □ /46 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /42 /71 /42 /49 /71 /60 /43 /41 /41 /41 □ /46 /78 /41 /41 /41 □ /46 /78 /74 /75 /1 /5 /28 /12 /2 /46 /3 /38 /12 /4 /7 /8 /34 /4 /5 /2 /8 /27 /12 /7 /74 /78 /76 □ /38 /12 /4 /7 /8 /74 /78 /76 □ /34 /4 /5 /2 /8 /27 /12 /7 /39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /57 /8 /2 /8 /27 /3 /8 /27 /56 /3
/30 /76 /57 □ /42 /35 /39 /60 /60 /35 /40 □ /46 /78
/30 /76 /57 □ /44 /35 /39 /60 /49 /35 /44 □ /46 /78
/30 /76 /57 □ /42 /60 /35 /39/60 /36 /35 /37 □ /46 /78
/30 /76 /57 □ /60 /39 /35 /39/60 /42 /35 /45 □ /46 /78
/30 /76 /57 □ /37 /37 /35 /37/60 /42 /35 /43 □ /46 /78
/30 /76 /57 □ /40 /39 /35 /39/60 /39 /35 /40 □ /46 /78
Apx-10
/0 /1 /2 /1 /3 □ /5 /6
/7 /8 /9/1 □ /10 /8 /11 /12 /13 /14 /15
/16 /17 /18 /17 /19 /16 /17 /18 /17 /20 /16 /17 /18 /17 /21 /16 /17 /18 /22 /23 /16 /17 /18 /22 /17 /16 /17 /18 /22 /19 /16 /17 /18 /22 /20 /16 /17 /18 /22 /21 /23
/17 /23
/19 /23
/20 /23
/21 /23
/16 /23 /23
/16 /17 /23
/16 /19 /23
/24 /14 /1 /25 /26 /1 /27 /28 /15
/29 /6 /30 □ /16 /31 /16 □ /0 /1 /25
/23 □ /5 /6 /17 /32 □ /5 /6 /32 /23 □ /5 /6
/16 /17 /18 /17 /19 /16 /17 /18 /17 /20 /16 /17 /18 /17 /21 /16 /17 /18 /22 /23 /16 /17 /18 /22 /17 /16 /17 /18 /22 /19 /16 /17 /18 /22 /20 /16 /17 /18 /22 /21 /21 /10 /33
/16 /17 /32 /10 /33
/16 /34 /10 /33
/21 /34 /10 /33
/24 /14 /1 /25 /26 /1 /27 /28 /15
/29 /6 /30 □ /16 /31 /16 □ /0 /9/35 /36
/23 □ /5 /6 /17 /32 □ /5 /6 /32 /23 □ /5 /6
/16 /17 /18 /17 /19 /16 /17 /18 /17 /20 /16 /17 /18 /17 /21 /16 /17 /18 /22 /23 /16 /17 /18 /22 /17 /16 /17 /18 /22 /19 /16 /17 /18 /22 /20 /16 /17 /18 /22 /21 /21 /10 /33
/16 /17 /32 /10 /33
/16 /34 /10 /33
/21 /34 /10 /33
Apx-11
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /12 □ /14 /15/16 /5
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9
/12 /19 /21 /19 /22 /12 /19 /21 /19 /23 /12 /19 /21 /19 /24 /12 /19 /21 /25 /17 /12 /19 /21 /25 /19 /12 /19 /21 /25 /22 /12 /19 /21 /25 /23 /12 /19 /21 /25 /24 /24 /26 /27
/12 /19 /20 /26 /27
/12 /28 /26 /27
/24 /28 /26 /27
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /25 □ /14 /2 /3
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9
/12 /19 /21 /19 /22 /12 /19 /21 /19 /23 /12 /19 /21 /19 /24 /12 /19 /21 /25 /17 /12 /19 /21 /25 /19 /12 /19 /21 /25 /22 /12 /19 /21 /25 /23 /12 /19 /21 /25 /24 /23 /29 /25 /26 /27
/12 /17 /17 /26 /27
/12 /28 /26 /27
/24 /28 /26 /27
/19 /17 /28 /26 /27
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /25 □ /14 /15/30 /31
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9
/12 /19 /21 /19 /22 /12 /19 /21 /19 /23 /12 /19 /21 /19 /24 /12 /19 /21 /25 /17 /12 /19 /21 /25 /19 /12 /19 /21 /25 /22 /12 /19 /21 /25 /23 /12 /19 /21 /25 /24 /23 /29 /25 /26 /27
/12 /17 /17 /26 /27
/12 /28 /26 /27
/24 /28 /26 /27
/19 /17 /28 /26 /27
Apx-12
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /14 □ /15 /16/17 /5
/18 □ /19 /9 /20 /21 □ /19 /9 /21 /18 □ /19 /9
/12 /20 /22 /20 /23 /12 /20 /22 /20 /24 /12 /20 /22 /20 /25 /12 /20 /22 /14 /18 /12 /20 /22 /14 /20 /12 /20 /22 /14 /23 /12 /20 /22 /14 /24 /12 /20 /22 /14 /25 /24 /26 /14 /27 /28
/12 /18 /18 /27 /28
/12 /29 /27 /28
/25 /29 /27 /28
/20 /18 /29 /27 /28
Apx-13
Noise Measurement
Field Data
Project Name: Fleming Concrete Pumping Truck Yard, Lake Elsinore Date:
Project #:
Noise Measurement #: Technician:
Weather: Settings: SLOW FAST
Temperature: 68 deg F Wind: 2 mph Humidity: 20% Terrain:
Start Time: 1:17 PM End Time: 1:32 PM Run Time:
Leq: 60.9 dB Traffic noise from the 50 vehicles traveling along W Flint St during 15 minute Lmax 76.9 dB measurement .Traffic ambiance from vehicles on 15 Fwy & other roads.
L2 67.6 dB Some residential ambiance, distant overhead air traffic. Bird song.
L8 64.7 dB Distant jack hammer in operation.
L25 61.3 dB
L50 56.9 dB
NOISE METER: CALIBRATOR:
MAKE: MAKE:
MODEL: MODEL:
SERIAL NUMBER: SERIAL NUMBER:
FACTORY CALIBRATION DATE:
FIELD CALIBRATION DATE:
November 28, 2023
Ian Edward Gallagher
Nearest Address or Cross Street: 109 W Flint St, Lake Elsinore, CA 92530 STNM2 Run Time: 15 minutes ( 1 x 15 minutes )
19687
Primary Noise Source:
Secondary Noise Sources:
Flat
Site Description (Type of Existing Land Use and any other notable features):
SoundTrack LXT Class 1
Clear skies, sunshine. Sunset 4:41 PM.
Larson Davis CA 250
Measurement Site: Just south of the residential use at 109 W Flint St and north of Flint St. Adjacent: 15 Fwy (running NW-SE) ~850' NE. Residential use to north, Flint St to south with commerical and residnetial uses further south, residential to east, and commercial uses to west.
11/18/202111/17/2021
11/28/2023
FACTORY CALIBRATION DATE:
Larson Davis
LXT1
3099
Larson Davis
CA 250
2723
Apx-14
Noise Measurement
Field Data
PHOTOS:
STNM2 looking WNW down W Fint Street towards N Spring Street intersection, STNM2 looking NNE towards frontyard of residence 109 W Flint Street, ( stop sign ~150' ). Lake Elsinore.
Apx-15
Summary
File Name on Meter LxT_Data.364.s
File Name on PC
Serial Number 3099
Model SoundTrack LxT®
Firmware Version 2.404
User Ian Edward Gallagher
Location STNM2 33°40'31.26"N 117°19'32.42"W
Job Description 15 minute noise measurement ( 1 x 15 minutes ) Note
Measurement
Start 2023-11-28 13:17:25
Stop 2023-11-28 13:32:25
Duration 00:15:00.0
Run Time 00:15:00.0
Pause 00:00:00.0
Pre-Calibration 2023-11-28 13:17:05
Post-Calibration None
Calibration Deviation ---
Overall Settings
RMS Weight A Weighting
Peak Weight A Weighting
Detector Slow
Preamplifier PRMLxT1L
Microphone Correction Off
Integration Method Linear
OBA Range Normal
OBA Bandwidth 1/1 and 1/3
OBA Frequency Weighting C Weighting
OBA Max Spectrum At LMax
Overload 122.4 dB
Results
LAeq 60.9
LAE 90.4
EA 122.2353 µPa²h
EA8 3.911531 mPa²h
EA40 19.55766 mPa²h
LApeak (max) 2023-11-28 13:29:24 93.0 dB
LASmax 2023-11-28 13:22:55 76.9 dB
LASmin 2023-11-28 13:27:56 46.5 dB
Statistics
LCeq 72.8 dB LA2.00 67.6 dB
LAeq 60.9 dB LA8.00 64.7 dB
LCeq - LAeq 12.0 dB LA25.00 61.3 dB
LAIeq 62.8 dB LA50.00 56.9 dB
LAeq 60.9 dB LA66.60 54.2 dB
LAIeq - LAeq 1.9 dB LA90.00 49.4 dB
Overload Count 0
LxT_0003099-20231128 131725-LxT_Data.364.ldbin
Ganddini Project#19687 Fleming Concrete Pumping Truck Yard, Lake Elsinore.
Apx-16
/0 /1 /2 /3 /4 /5 /1 /6/1 /7 /8 □ /10 /1 /11 /12 /5 /8
/13 /14 /15 /16 /17 /18 □ /20 /21 /22/22/23 /17 /24
/0 /1 /8 /1 /5 /25 /3 □ /26 /27 /28 /1 □ /29 /2 /6/1/30 /31 /32 /33 /34 /2 /8 /2 /35 /36 /37 /38 /35 /3/39 /12 /6/11 /4 /8 /1 /5 /25 /3 □ /26 /27 /28 /1 □ /29 /2 /6/1/30 /31 /32 /33 /40 /40 /40 /36 /40 /41 /41 /42 /43 /40 /43 /36 /44 /44 /43 /45 □ /44 /36 /44 /46 /43 /47 /42 /30 /31 /32 /33 /34 /2 /8 /2 /35 /36 /37 /38 /35 /28 /48 /49 /27 /7 /0 /1 /8 /1 /5 /30 /31 /32 /44 /40 /40 /40 /36 /40 /41 /41 /26 /27 /5 /6/50 /2 /5 /1/43 /35 /38 /40 /38
/51 /3 /1 /5 /52 /2 /7 □ /53 /48 /50 /2 /5 /48 □ /54 /2 /28 /28 /2 /55 /56 /1 /5 /30 /12 /57 /2 /8 /27 /12 /7/58 /32 /29 /0 /43 □ /36 /36 /59 /38 /40 /25 /36 /44 /35 /43 /37 /60 /29 □ /44 /44 /46 /59 /44 /41 /25 /36 /43 /35 /38 /43 /60 /61 /62 /12 /49 □ /34 /1 /3 /57 /5 /27 /11 /8 /27 /12 /7/44 /47 □ /6/27 /7 /4 /8 /1 □ /7 /12 /27 /3 /1 □ /6/1 /2 /3 /4 /5 /1 /6/1 /7 /8 □ /63 □ /44 □ /31 □ /44 /47 □ /6/27 /7 /4 /8 /1 /3 □ /64 /29 /12 /8 /1 /54 /2 /7 /48 /48 /27 /7 /27 □ /65 /5 /12 /66 /1 /57 /8 /67 /44 /41 /37 /45 /46 □ /26 /28 /1 /6/27 /7 /55 □ /39 /12 /7 /57 /5 /1 /8 /1 □ /65 /4 /6/11 /27 /7 /55 □ /32 /5 /4 /57 /68 □ /69 /2 /5 /48 /70 □ /30 /2 /68 /1 □ /53 /28 /3 /27 /7 /12 /5 /1 /35 /58 /8 /2 /5 /8 □ /32 /27 /6/1/43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /44 /46 /71 /43 /47/34 /4 /5 /2 /8 /27 /12 /7/40 /71 /44 /47 /71 /40 /40 /35 /40 /53 /7 /48 □ /32 /27 /6/1/43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /36 /43 /71 /43 /47/10 /4 /7 □ /32 /27 /6/1/40 /71 /44 /47 /71 /40 /40 /35 /40/65 /2 /4 /3 /1 □ /32 /27 /6/1/40 /71 /40 /40 /71 /40 /40 /35 /40 □
/13 /14 /72 /21 /73 /18 /72
/74 /75 /1 /5 /2 /28 /28 □ /0 /1 /8 /5 /27 /57 /3
/30 /76 /1 /77 /37 /40 /35 /41 □ /48 /78
/30 /76 /53 /41 /40 /35 /38 □ /48 /78/58 /53 /76 /42 /42 /42 □ /48 /78 /53 /76 /44 /43 /43 /35 /43 □ /79 /65 /2 /80 /56/30 /76 /26 /32 /0 /47 /37 /47 /35 /47 □ /48 /78 /53 /76 /45 /36 /35 /41 □ /6/65 /2 /80 /56
/53 /76 /38 /40 /44 /41 /35 /37 □ /6/65 /2 /80 /56
/30 /76 /11 /1 /2 /68 /41 /36 /35 /40 □ /48 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /43 /41 /71 /43 /38 /30 /76 /58 /6/2 /31 /46 /37 /35 /41 □ /48 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /43 /43 /71 /47 /47 /30 /76 /58 /6/27 /7 /38 /37 /35 /47 □ /48 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /43 /46 /71 /47 /37 /30 /76 /1 /77 /37 /40 /35 /41 □ /48 /78
/30 /39 /1 /77 /46 /43 /35 /45 □ /48 /78/30 /39 /1 /77□ /42 □ /30 /76/1 /77 /44 /43 /35 /40 □ /48 /78 /30 /76 /52 /1 /77 /37 /43 /35 /45 □ /48 /78/30 /76 /52 /1 /77□ /42 □ /30 /76/1 /77 /44 /35 /41 □ /48 /78 /53 /31 /57 /1 /1 /48 /2 /7 /57 /1 /3 /39 /12 /4 /7 /8 /34 /4 /5 /2 /8 /27 /12 /7 /30 /76 /58 □ /81 □ /37 /47 /35 /40 □ /48 /78/43 /37 /40 /71 /40 /44 /71 /36 /38 /35 /37 /30 /76 /58 □ /81 □ /45 /47 /35 /40 □ /48 /78/40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /30 /76 /11 /1 /2 /68 □ /81 □ /44 /36 /47 /35 /40 □ /48 /78/40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /30 /76 /11 /1 /2 /68 □ /81 □ /44 /36 /46 /35 /40 □ /48 /78/40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /30 /76 /11 /1 /2 /68 □ /81 □ /44 /38 /40 /35 /40 □ /48 /78/40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /39 /12 /6/6/4 /7 /27 /8 /82 □ /29 /12 /27 /3 /1 /30 /34 /29 /30 /34 /2 /82 /30 /29 /27 /55 /56 /8 /42 /42 /42 □ /48 /78 /42 /42 /42 □ /48 /78 /40 /35 /40 □ /48 /78 /30 /34 /53 /29 /30 /34 /2 /82 /30 /53 /75 /1 /30 /29 /27 /55 /56 /8 /42 /42 /42 □ /48 /78 /42 /42 /42 □ /48 /78 /42 /42 /42 □ /48 /78 /42 /42 /42 □ /48 /78 /76 /7 /82 □ /34 /2 /8 /2 /76 /39 /83
/30 /1 /75 /1 /28 /32 /27 /6/1 □ /58 /8 /2 /6/11 /30 /1 /75 /1 /28 /32 /27 /6/1 □ /58 /8 /2 /6/11 /30 /1 /75 /1 /28 /32 /27 /6/1 □ /58 /8 /2 /6/11 /30 /1 /77 /37 /40 /35 /41 □ /48 /78 /46 /43 /35 /45 □ /48 /78 /42 /42 /42 □ /48 /78 /30 /3 /63 /6/2 /31 /64 /46 /37 /35 /41 □ /48 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /43 /43 /71 /47 /47 /42 /42 /42 □ /48 /78 /42 /42 /42 □ /48 /78 /30 /58 /63 /6/27 /7 /64 /38 /37 /35 /47 □ /48 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /43 /46 /71 /47 /37 /42 /42 /42 □ /48 /78 /42 /42 /42 □ /48 /78 /30 /65 /1 /2 /68 /63 /6/2 /31 /64 /41 /36 /35 /40 □ /48 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /43 /41 /71 /43 /38 /42 /42 /42 □ /48 /78 /42 /42 /42 □ /48 /78 /74 /75 /1 /5 /28 /12 /2 /48 /3 /39 /12 /4 /7 /8 /34 /4 /5 /2 /8 /27 /12 /7 /74 /78 /76 □ /39 /12 /4 /7 /8 /74 /78 /76 □ /34 /4 /5 /2 /8 /27 /12 /7 /40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /58 /8 /2 /8 /27 /3 /8 /27 /57 /3
/30 /76 /58 □ /43 /35 /40 /37 /46 /35 /37 □ /48 /78
/30 /76 /58 □ /45 /35 /40 /37 /38 /35 /46 □ /48 /78
/30 /76 /58 □ /43 /47 /35 /40/37 /44 /35 /36 □ /48 /78
/30 /76 /58 □ /47 /40 /35 /40/47 /37 /35 /41 □ /48 /78
/30 /76 /58 □ /37 /37 /35 /37/47 /38 /35 /43 □ /48 /78
/30 /76 /58 □ /41 /40 /35 /40/38 /41 /35 /38 □ /48 /78
Apx-17
/0 /1 /2 /1 /3 □ /5 /6
/7 /8 /9/1 □ /10 /8 /11 /12 /13 /14 /15
/16 /17 /18 /16 /19 /16 /17 /18 /20 /21 /16 /17 /18 /20 /20 /16 /17 /18 /20 /22 /16 /17 /18 /20 /23 /16 /17 /18 /20 /19 /16 /17 /18 /17 /21 /16 /17 /18 /17 /20 /21
/20 /21
/22 /21
/23 /21
/19 /21
/16 /21 /21
/16 /20 /21
/16 /22 /21
/24 /14 /1 /25 /26 /1 /27 /28 /15
/29 /6 /30 □ /16 /31 /16 □ /0 /1 /25
/21 □ /5 /6 /20 /32 □ /5 /6 /32 /21 □ /5 /6 /33 /32 □ /5 /6 /16 /17 /18 /16 /19 /16 /17 /18 /20 /21 /16 /17 /18 /20 /20 /16 /17 /18 /20 /22 /16 /17 /18 /20 /23 /16 /17 /18 /20 /19 /16 /17 /18 /17 /21 /16 /17 /18 /17 /20 /19 /10 /34
/16 /20 /32 /10 /34
/16 /35 /10 /34
/19 /35 /10 /34
/24 /14 /1 /25 /26 /1 /27 /28 /15
/29 /6 /30 □ /16 /31 /16 □ /0 /9/36 /37
/21 □ /5 /6 /20 /32 □ /5 /6 /32 /21 □ /5 /6 /33 /32 □ /5 /6 /16 /17 /18 /16 /19 /16 /17 /18 /20 /21 /16 /17 /18 /20 /20 /16 /17 /18 /20 /22 /16 /17 /18 /20 /23 /16 /17 /18 /20 /19 /16 /17 /18 /17 /21 /16 /17 /18 /17 /20 /19 /10 /34
/16 /20 /32 /10 /34
/16 /35 /10 /34
/19 /35 /10 /34
Apx-18
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /12 □ /14 /15/16 /5
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /12 /24 /12 /22 /23 /19 /17 /12 /22 /23 /19 /19 /12 /22 /23 /19 /25 /12 /22 /23 /19 /26 /12 /22 /23 /19 /24 /12 /22 /23 /22 /17 /12 /22 /23 /22 /19 /24 /27 /28
/12 /19 /20 /27 /28
/12 /29 /27 /28
/24 /29 /27 /28
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /22 □ /14 /2 /3
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /12 /24 /12 /22 /23 /19 /17 /12 /22 /23 /19 /19 /12 /22 /23 /19 /25 /12 /22 /23 /19 /26 /12 /22 /23 /19 /24 /12 /22 /23 /22 /17 /12 /22 /23 /22 /19 /26 /30 /22 /27 /28
/12 /17 /17 /27 /28
/12 /29 /27 /28
/24 /29 /27 /28
/19 /17 /29 /27 /28
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /22 □ /14 /15/31 /32
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /12 /24 /12 /22 /23 /19 /17 /12 /22 /23 /19 /19 /12 /22 /23 /19 /25 /12 /22 /23 /19 /26 /12 /22 /23 /19 /24 /12 /22 /23 /22 /17 /12 /22 /23 /22 /19 /26 /30 /22 /27 /28
/12 /17 /17 /27 /28
/12 /29 /27 /28
/24 /29 /27 /28
/19 /17 /29 /27 /28
Apx-19
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /14 □ /15 /16/17 /5
/18 □ /19 /9 /20 /21 □ /19 /9 /21 /18 □ /19 /9 /22 /21 □ /19 /9 /12 /14 /23 /12 /24 /12 /14 /23 /20 /18 /12 /14 /23 /20 /20 /12 /14 /23 /20 /25 /12 /14 /23 /20 /26 /12 /14 /23 /20 /24 /12 /14 /23 /14 /18 /12 /14 /23 /14 /20 /26 /27 /14 /28 /29
/12 /18 /18 /28 /29
/12 /30 /28 /29
/24 /30 /28 /29
/20 /18 /30 /28 /29
Apx-20
Noise Measurement
Field Data
Project Name: Fleming Concrete Pumping Truck Yard, Lake Elsinore Date:
Project #:
Noise Measurement #: Technician:
Weather: Settings: SLOW FAST
Temperature: 68 deg F Wind: 2 mph Humidity: 20% Terrain:
Start Time: 1:50 PM End Time: 2:05 PM Run Time:
Leq: 67.7 dB Traffic noise from the 168 vehicles traveling along N Spring St during 15 minute Lmax 81.9 dB measurement. Traffic ambiance from vehicles on 15 Fwy & other roads.
L2 74.5 dB Some residential ambiance, distant overhead air traffic. Bird song. Distant jack L8 71.6 dB hammer in operation. Forklift noise from storage yard across N Spring St.
L25 68.2 dB
L50 65.2 dB
NOISE METER: CALIBRATOR:
MAKE: MAKE:
MODEL: MODEL:
SERIAL NUMBER: SERIAL NUMBER:
FACTORY CALIBRATION DATE:
FIELD CALIBRATION DATE:
11/18/202111/17/2021
11/28/2023
FACTORY CALIBRATION DATE:
Larson Davis
LXT1
3099
Larson Davis
CA 250
2723
Primary Noise Source:
Secondary Noise Sources:
Flat
Site Description (Type of Existing Land Use and any other notable features):
SoundTrack LXT Class 1
Clear skies, sunshine. Sunset 4:41 PM.
Larson Davis CA 250
Measurement Site: Near southwestern corner of the residential use at 516 N Spring Street just east of Spring St. Adjacent: 15 Fwy (running NW-SE) ~850' NE. Residential to northeast, residential to southeast, and Spring St to west with commercial uses further west. Commercial and residential throughout surrounding area.
November 28, 2023
Ian Edward Gallagher
Nearest Address or Cross Street: 516 N Spring Street, Lake Elsinore, CA 92530 STNM3 Run Time: 15 minutes ( 1 x 15 minutes )
19687
Apx-21
Noise Measurement
Field Data
PHOTOS:
STNM3 looking NE at frontyard/driveway to residence 516 N Spring Street, STNM3 looking NW across N Spring Street towards E entryway to storage Lake Elsinore . yard of building 202 W Minthorn Street, Lake Elsinore.
Apx-22
Summary
File Name on Meter LxT_Data.365.s
File Name on PC
Serial Number 3099
Model SoundTrack LxT®
Firmware Version 2.404
User Ian Edward Gallagher
Location STNM3 33°40'35.09"N 117°19'32.62"W
Job Description 15 minute noise measurement ( 1 x 15 minutes ) Note
Measurement
Start 2023-11-28 13:50:49
Stop 2023-11-28 14:05:49
Duration 00:15:00.0
Run Time 00:15:00.0
Pause 00:00:00.0
Pre-Calibration 2023-11-28 13:50:30
Post-Calibration None
Calibration Deviation ---
Overall Settings
RMS Weight A Weighting
Peak Weight A Weighting
Detector Slow
Preamplifier PRMLxT1L
Microphone Correction Off
Integration Method Linear
OBA Range Normal
OBA Bandwidth 1/1 and 1/3
OBA Frequency Weighting C Weighting
OBA Max Spectrum At LMax
Overload 122.6 dB
Results
LAeq 67.7
LAE 97.2
EA 582.7355 µPa²h
EA8 18.64754 mPa²h
EA40 93.23768 mPa²h
LApeak (max) 2023-11-28 13:52:12 99.2 dB
LASmax 2023-11-28 13:52:30 81.9 dB
LASmin 2023-11-28 14:05:22 51.3 dB
Statistics
LCeq 78.4 dB LA2.00 74.5 dB
LAeq 67.7 dB LA8.00 71.6 dB
LCeq - LAeq 10.7 dB LA25.00 68.2 dB
LAIeq 70.8 dB LA50.00 65.2 dB
LAeq 67.7 dB LA66.60 63.3 dB
LAIeq - LAeq 3.1 dB LA90.00 57.8 dB
Overload Count 0
LxT_0003099-20231128 135049-LxT_Data.365.ldbin
Ganddini Project#19687 Fleming Concrete Pumping Truck Yard, Lake Elsinore.
Apx-23
/0 /1 /2 /3 /4 /5 /1 /6/1 /7 /8 □ /10 /1 /11 /12 /5 /8
/13 /14 /15 /16 /17 /18 □ /20 /21 /22/22/23 /17 /24
/0 /1 /8 /1 /5 /25 /3 □ /26 /27 /28 /1 □ /29 /2 /6/1/30 /31 /32 /33 /34 /2 /8 /2 /35 /36 /37 /38 /35 /3/39 /12 /6/11 /4 /8 /1 /5 /25 /3 □ /26 /27 /28 /1 □ /29 /2 /6/1/30 /31 /32 /33 /40 /40 /40 /36 /40 /41 /41 /42 /43 /40 /43 /36 /44 /44 /43 /45 □ /44 /36 /38 /40 /46 /41 /42 /30 /31 /32 /33 /34 /2 /8 /2 /35 /36 /37 /38 /35 /28 /47 /48 /27 /7 /0 /1 /8 /1 /5 /30 /31 /32 /44 /40 /40 /40 /36 /40 /41 /41 /26 /27 /5 /6/49 /2 /5 /1/43 /35 /46 /40 /46
/50 /3 /1 /5 /51 /2 /7 □ /52 /47 /49 /2 /5 /47 □ /53 /2 /28 /28 /2 /54 /55 /1 /5 /30 /12 /56 /2 /8 /27 /12 /7/57 /32 /29 /0 /36 □ /36 /36 /58 /46 /40 /25 /36 /38 /35 /40 /41 /59 /29 □ /44 /44 /60 /58 /44 /41 /25 /36 /43 /35 /37 /43 /59 /61 /62 /12 /48 □ /34 /1 /3 /56 /5 /27 /11 /8 /27 /12 /7/44 /38 □ /6/27 /7 /4 /8 /1 □ /7 /12 /27 /3 /1 □ /6/1 /2 /3 /4 /5 /1 /6/1 /7 /8 □ /63 □ /44 □ /31 □ /44 /38 □ /6/27 /7 /4 /8 /1 /3 □ /64 /29 /12 /8 /1 /53 /2 /7 /47 /47 /27 /7 /27 □ /65 /5 /12 /66 /1 /56 /8 /67 /44 /41 /37 /45 /60 □ /26 /28 /1 /6/27 /7 /54 □ /39 /12 /7 /56 /5 /1 /8 /1 □ /65 /4 /6/11 /27 /7 /54 □ /32 /5 /4 /56 /68 □ /69 /2 /5 /47 /70 □ /30 /2 /68 /1 □ /52 /28 /3 /27 /7 /12 /5 /1 /35 /57 /8 /2 /5 /8 □ /32 /27 /6/1/43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /38 /40 /71 /46 /41/34 /4 /5 /2 /8 /27 /12 /7/40 /71 /44 /38 /71 /40 /40 /35 /40 /52 /7 /47 □ /32 /27 /6/1/43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /46 /71 /40 /38 /71 /46 /41/10 /4 /7 □ /32 /27 /6/1/40 /71 /44 /38 /71 /40 /40 /35 /40/65 /2 /4 /3 /1 □ /32 /27 /6/1/40 /71 /40 /40 /71 /40 /40 /35 /40 □
/13 /14 /72 /21 /73 /18 /72
/74 /75 /1 /5 /2 /28 /28 □ /0 /1 /8 /5 /27 /56 /3
/30 /76 /1 /77 /37 /60 /35 /60 □ /47 /78
/30 /76 /52 /41 /60 /35 /43 □ /47 /78/57 /52 /76 /42 /42 /42 □ /47 /78 /52 /76 /38 /45 /43 /35 /60 □ /79 /65 /2 /80 /55/30 /76 /26 /32 /0 /38 /60 /36 /35 /36 □ /47 /78 /52 /76 /45 /44 /45 /35 /37 □ /6/65 /2 /80 /55
/52 /76 /46 /40 /41 /36 /35 /43 □ /6/65 /2 /80 /55
/30 /76 /11 /1 /2 /68 /41 /41 /35 /43 □ /47 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /38 /43 /71 /44 /43 /30 /76 /57 /6/2 /31 /45 /44 /35 /41 □ /47 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /38 /43 /71 /36 /40 /30 /76 /57 /6/27 /7 /38 /44 /35 /36 □ /47 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /46 /71 /40 /38 /71 /43 /43 /30 /76 /1 /77 /37 /60 /35 /60 □ /47 /78
/30 /39 /1 /77 /60 /45 /35 /46 □ /47 /78/30 /39 /1 /77□ /42 □ /30 /76/1 /77 /44 /40 /35 /60 □ /47 /78 /30 /76 /51 /1 /77 /60 /40 /35 /45 □ /47 /78/30 /76 /51 /1 /77□ /42 □ /30 /76/1 /77 /36 /35 /44 □ /47 /78 /52 /31 /56 /1 /1 /47 /2 /7 /56 /1 /3 /39 /12 /4 /7 /8 /34 /4 /5 /2 /8 /27 /12 /7 /30 /76 /57 □ /81 □ /37 /38 /35 /40 □ /47 /78/36 /46 /40 /71 /40 /41 /71 /43 /60 /35 /46 /30 /76 /57 □ /81 □ /45 /38 /35 /40 □ /47 /78/40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /30 /76 /11 /1 /2 /68 □ /81 □ /44 /36 /38 /35 /40 □ /47 /78/40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /30 /76 /11 /1 /2 /68 □ /81 □ /44 /36 /60 /35 /40 □ /47 /78/40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /30 /76 /11 /1 /2 /68 □ /81 □ /44 /46 /40 /35 /40 □ /47 /78/40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /39 /12 /6/6/4 /7 /27 /8 /82 □ /29 /12 /27 /3 /1 /30 /34 /29 /30 /34 /2 /82 /30 /29 /27 /54 /55 /8 /42 /42 /42 □ /47 /78 /42 /42 /42 □ /47 /78 /40 /35 /40 □ /47 /78 /30 /34 /52 /29 /30 /34 /2 /82 /30 /52 /75 /1 /30 /29 /27 /54 /55 /8 /42 /42 /42 □ /47 /78 /42 /42 /42 □ /47 /78 /42 /42 /42 □ /47 /78 /42 /42 /42 □ /47 /78 /76 /7 /82 □ /34 /2 /8 /2 /76 /39 /83
/30 /1 /75 /1 /28 /32 /27 /6/1 □ /57 /8 /2 /6/11 /30 /1 /75 /1 /28 /32 /27 /6/1 □ /57 /8 /2 /6/11 /30 /1 /75 /1 /28 /32 /27 /6/1 □ /57 /8 /2 /6/11 /30 /1 /77 /37 /60 /35 /60 □ /47 /78 /60 /45 /35 /46 □ /47 /78 /42 /42 /42 □ /47 /78 /30 /3 /63 /6/2 /31 /64 /45 /44 /35 /41 □ /47 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /38 /43 /71 /36 /40 /42 /42 /42 □ /47 /78 /42 /42 /42 □ /47 /78 /30 /57 /63 /6/27 /7 /64 /38 /44 /35 /36 □ /47 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /46 /71 /40 /38 /71 /43 /43 /42 /42 /42 □ /47 /78 /42 /42 /42 □ /47 /78 /30 /65 /1 /2 /68 /63 /6/2 /31 /64 /41 /41 /35 /43 □ /47 /78 /43 /40 /43 /36 /42 /44 /44 /42 /43 /45 □ /44 /36 /71 /38 /43 /71 /44 /43 /42 /42 /42 □ /47 /78 /42 /42 /42 □ /47 /78 /74 /75 /1 /5 /28 /12 /2 /47 /3 /39 /12 /4 /7 /8 /34 /4 /5 /2 /8 /27 /12 /7 /74 /78 /76 □ /39 /12 /4 /7 /8 /74 /78 /76 □ /34 /4 /5 /2 /8 /27 /12 /7 /40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /40 /40 /71 /40 /40 /71 /40 /40 /35 /40 /57 /8 /2 /8 /27 /3 /8 /27 /56 /3
/30 /76 /57 □ /43 /35 /40 /60 /46 /35 /38 □ /47 /78
/30 /76 /57 □ /45 /35 /40 /60 /44 /35 /37 □ /47 /78
/30 /76 /57 □ /43 /38 /35 /40/37 /45 /35 /43 □ /47 /78
/30 /76 /57 □ /38 /40 /35 /40/37 /38 /35 /43 □ /47 /78
/30 /76 /57 □ /37 /37 /35 /37/37 /36 /35 /36 □ /47 /78
/30 /76 /57 □ /41 /40 /35 /40/38 /60 /35 /45 □ /47 /78
Apx-24
/0 /1 /2 /1 /3 □ /5 /6
/7 /8 /9/1 □ /10 /8 /11 /12 /13 /14 /15
/16 /17 /18 /19 /20 /16 /17 /18 /19 /21 /16 /17 /18 /19 /22 /16 /17 /18 /19 /23 /16 /21 /18 /24 /24 /16 /21 /18 /24 /20 /16 /21 /18 /24 /21 /24
/20 /24
/21 /24
/22 /24
/23 /24
/16 /24 /24
/16 /20 /24
/16 /21 /24
/25 /14 /1 /26 /27 /1 /28 /29 /15
/30 /6 /31 □ /16 /32 /16 □ /0 /1 /26
/24 □ /5 /6 /20 /19 □ /5 /6 /19 /24 □ /5 /6 /33 /19 □ /5 /6 /16 /17 /18 /19 /20 /16 /17 /18 /19 /21 /16 /17 /18 /19 /22 /16 /17 /18 /19 /23 /16 /21 /18 /24 /24 /16 /21 /18 /24 /20 /16 /21 /18 /24 /21 /23 /10 /34
/16 /20 /19 /10 /34
/16 /35 /10 /34
/23 /35 /10 /34
/25 /14 /1 /26 /27 /1 /28 /29 /15
/30 /6 /31 □ /16 /32 /16 □ /0 /9/36 /37
/24 □ /5 /6 /20 /19 □ /5 /6 /19 /24 □ /5 /6 /33 /19 □ /5 /6 /16 /17 /18 /19 /20 /16 /17 /18 /19 /21 /16 /17 /18 /19 /22 /16 /17 /18 /19 /23 /16 /21 /18 /24 /24 /16 /21 /18 /24 /20 /16 /21 /18 /24 /21 /23 /10 /34
/16 /20 /19 /10 /34
/16 /35 /10 /34
/23 /35 /10 /34
Apx-25
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /12 □ /14 /15/16 /5
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /20 /19 /12 /22 /23 /20 /24 /12 /22 /23 /20 /25 /12 /22 /23 /20 /26 /12 /24 /23 /17 /17 /12 /24 /23 /17 /19 /12 /24 /23 /17 /24 /26 /27 /28
/12 /19 /20 /27 /28
/12 /29 /27 /28
/26 /29 /27 /28
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /22 □ /14 /2 /3
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /20 /19 /12 /22 /23 /20 /24 /12 /22 /23 /20 /25 /12 /22 /23 /20 /26 /12 /24 /23 /17 /17 /12 /24 /23 /17 /19 /12 /24 /23 /17 /24 /25 /30 /22 /27 /28
/12 /17 /17 /27 /28
/12 /29 /27 /28
/26 /29 /27 /28
/19 /17 /29 /27 /28
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /22 □ /14 /15/31 /32
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /20 /19 /12 /22 /23 /20 /24 /12 /22 /23 /20 /25 /12 /22 /23 /20 /26 /12 /24 /23 /17 /17 /12 /24 /23 /17 /19 /12 /24 /23 /17 /24 /25 /30 /22 /27 /28
/12 /17 /17 /27 /28
/12 /29 /27 /28
/26 /29 /27 /28
/19 /17 /29 /27 /28
Apx-26
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /14 □ /15 /16/17 /5
/18 □ /19 /9 /20 /21 □ /19 /9 /21 /18 □ /19 /9 /22 /21 □ /19 /9 /12 /14 /23 /21 /20 /12 /14 /23 /21 /24 /12 /14 /23 /21 /25 /12 /14 /23 /21 /26 /12 /24 /23 /18 /18 /12 /24 /23 /18 /20 /12 /24 /23 /18 /24 /25 /27 /14 /28 /29
/12 /18 /18 /28 /29
/12 /30 /28 /29
/26 /30 /28 /29
/20 /18 /30 /28 /29
Apx-27
Noise Measurement
Field Data
Project Name: Fleming Concrete Pumping Truck Yard, Lake Elsinore Date:
Project #:
Noise Measurement #: Technician:
Weather: Settings: SLOW FAST
Temperature: 40-70 deg F Wind: 0-8 mph Humidity: 20-55% Terrain:
Start Time: 4:00 PM End Time: 4:00 PM Run Time:
Leq: 57.3 dB Traffic noise from vehicles traveling along N Langstaff St during 24 hour Lmax 83.5 dB measurement. Traffic ambiance from vehicles on 15 Fwy & other roads.
L2 63.1 dB Some residential ambiance, distant overhead air traffic. Bird song by day.
L8 61.1 dB Industrial ambiance from storage yard on opposite side of N Langstaff St.
L25 58.2 dB
L50 55.3 dB
NOISE METER: CALIBRATOR:
MAKE: MAKE:
MODEL: MODEL:
SERIAL NUMBER: SERIAL NUMBER:
FACTORY CALIBRATION DATE:
FIELD CALIBRATION DATE:
November 28-29, 2023
Ian Edward Gallagher
Nearest Address or Cross Street: 513 N Langstaff Street, Lake Elsinore, CA 92530 LTNM1 Run Time: 24 hours ( 24 x 1 hours )
19687
Primary Noise Source:
Secondary Noise Sources:
Flat
Site Description (Type of Existing Land Use and any other notable features):
SoundTrack LXT Class 1
Clear skies, sun by day . Sunset/rise: 4:41 PM/ 6:33AM
Larson Davis CA 250
Measurement Site: Near the eastern property line of the residence at 513 Langstaff Street and just west of Langstaff St. Adjacent: 15 Fwy (running NW-SE) ~1,100' NE. Langstaff St to east, single-family residential to west, commercial uses to north, & multi- family residential to south.
11/18/202111/17/2021
11/28/2023
FACTORY CALIBRATION DATE:
Larson Davis
LXT1
3099
Larson Davis
CA 250
2723
Apx-28
Noise Measurement
Field Data
PHOTOS:
LTNM1 looking at microphone (~7' above ground) located in evergreen tree LTNM1 aerial view, showing location of microphone relative to surrounding just south of residence 513 N LangStaff Street, Lake Elsinore. area.
Apx-29
Summary
File Name on Meter LxT_Data.366.s
File Name on PC
Serial Number 0003099
Model SoundTrack LxT®
Firmware Version 2.404
User Ian Edward Gallagher
Location LTNM1 33°40'37.58"N 117°19'42.56"W
Job Description 24 hour noise measurement ( 24 x 1 hours ) Note
Measurement
Start 2023-11-28 16:00:00
Stop 2023-11-29 16:00:00
Duration 24:00:00.0
Run Time 24:00:00.0
Pause 00:00:00.0
Pre-Calibration 2023-11-28 14:51:24
Post-Calibration None
Calibration Deviation ---
Overall Settings
RMS Weight A Weighting
Peak Weight A Weighting
Detector Slow
Preamplifier PRMLxT1L
Microphone Correction Off
Integration Method Linear
OBA Range Normal
OBA Bandwidth 1/1 and 1/3
OBA Frequency Weighting A Weighting
OBA Max Spectrum Bin Max
Overload 122.6 dB
Results
LAeq 57.3
LAE 106.7
EA 5.215 mPa²h
EA8 1.738 mPa²h
EA40 8.691 mPa²h
LApeak (max) 2023-11-29 14:46:40 96.4 dB
LASmax 2023-11-29 14:46:42 83.5 dB
LASmin 2023-11-29 10:55:02 42.8 dB
Statistics
LCeq 63.4 dB LA2.00 63.1 dB
LAeq 57.3 dB LA8.00 61.1 dB
LCeq - LAeq 6.0 dB LA25.00 58.2 dB
LAIeq 58.4 dB LA50.00 55.3 dB
LAeq 57.3 dB LA90.00 49.0 dB
LAIeq - LAeq 1.0 dB LA99.00 46.1 dB
Overload Count 0
LxT_0003099-20231128 160000-LxT_Data.366.ldbin
Ganddini Project#19687 Fleming Concrete Pumping Truck Yard, Lake Elsinore.
Apx-30
Record # Date Time Run Duration Run Time Pause LAeq LASmin LASmin Time LASmax LASmax Time LAS2.00 LAS8.00 LAS25.00 LAS50.00 LAS90.00 LAS99.00 1 2023-11-28 16:00:00 01:00:00.0 01:00:00.0 00:00:00.0 49.7 44.6 16:49:59 64.7 16:59:09 55.1 51.4 50.0 48.7 47.1 45.9 2 2023-11-28 17:00:00 01:00:00.0 01:00:00.0 00:00:00.0 55.1 44.4 17:24:06 77.4 17:42:35 61.9 55.7 53.8 50.3 46.6 45.3 3 2023-11-28 18:00:00 01:00:00.0 01:00:00.0 00:00:00.0 57.2 50.9 18:52:20 69.6 18:40:32 61.5 59.3 57.8 56.2 53.9 51.8 4 2023-11-28 19:00:00 01:00:00.0 01:00:00.0 00:00:00.0 61.3 53.8 19:01:54 71.1 19:50:20 64.4 63.3 62.0 60.8 58.5 55.5 5 2023-11-28 20:00:00 01:00:00.0 01:00:00.0 00:00:00.0 58.7 51.7 20:24:33 70.8 20:18:31 63.4 62.1 59.5 57.5 54.6 53.0 6 2023-11-28 21:00:00 01:00:00.0 01:00:00.0 00:00:00.0 58.6 50.8 21:11:25 64.5 21:38:14 62.7 61.4 59.6 57.9 55.0 52.3 7 2023-11-28 22:00:00 01:00:00.0 01:00:00.0 00:00:00.0 58.3 51.5 22:18:53 65.7 22:41:55 62.0 60.7 59.0 57.6 55.6 54.1 8 2023-11-28 23:00:00 01:00:00.0 01:00:00.0 00:00:00.0 57.1 47.7 23:45:38 65.2 23:11:31 61.6 60.1 58.5 56.4 52.0 49.5 9 2023-11-29 00:00:00 01:00:00.0 01:00:00.0 00:00:00.0 55.3 47.6 00:50:54 61.5 00:26:32 59.1 57.7 56.1 54.8 52.0 50.0 10 2023-11-29 01:00:00 01:00:00.0 01:00:00.0 00:00:00.0 55.3 46.2 01:39:26 62.1 01:28:59 59.5 57.9 56.3 54.7 51.6 48.2 11 2023-11-29 02:00:00 01:00:00.0 01:00:00.0 00:00:00.0 54.2 47.0 02:25:03 61.2 02:11:29 58.1 56.7 55.1 53.7 51.3 48.9 12 2023-11-29 03:00:00 01:00:00.0 01:00:00.0 00:00:00.0 56.4 48.1 03:26:11 62.8 03:10:31 60.1 59.0 57.4 55.8 52.6 49.7 13 2023-11-29 04:00:00 01:00:00.0 01:00:00.0 00:00:00.0 59.8 54.4 04:06:10 69.7 04:57:05 62.8 61.6 60.6 59.5 57.4 55.9 14 2023-11-29 05:00:00 01:00:00.0 01:00:00.0 00:00:00.0 60.0 52.8 05:37:38 70.2 05:47:47 63.5 62.5 61.2 59.5 56.4 54.4 15 2023-11-29 06:00:00 01:00:00.0 01:00:00.0 00:00:00.0 61.1 53.0 06:48:59 76.3 06:53:34 64.7 63.6 62.4 60.6 56.3 54.2 16 2023-11-29 07:00:00 01:00:00.0 01:00:00.0 00:00:00.0 59.2 51.0 07:55:22 71.0 07:40:46 63.8 61.9 60.3 58.8 54.1 52.6 17 2023-11-29 08:00:00 01:00:00.0 01:00:00.0 00:00:00.0 54.7 47.8 08:39:25 67.3 08:54:20 58.8 57.1 55.6 54.0 50.9 48.5 18 2023-11-29 09:00:00 01:00:00.0 01:00:00.0 00:00:00.0 54.0 43.9 09:36:03 78.4 09:00:34 57.6 55.5 53.8 51.7 47.5 45.6 19 2023-11-29 10:00:00 01:00:00.0 01:00:00.0 00:00:00.0 53.0 42.8 10:55:02 62.2 10:23:20 58.0 56.7 54.5 51.3 47.3 45.3 20 2023-11-29 11:00:00 01:00:00.0 01:00:00.0 00:00:00.0 56.8 49.8 11:00:00 72.1 11:05:14 64.4 57.5 55.8 54.6 52.7 50.9 21 2023-11-29 12:00:00 01:00:00.0 01:00:00.0 00:00:00.0 55.2 47.7 12:30:06 70.2 12:27:12 60.3 57.7 55.5 53.9 51.2 48.9 22 2023-11-29 13:00:00 01:00:00.0 01:00:00.0 00:00:00.0 54.1 46.8 13:59:56 66.9 13:38:55 58.8 56.7 55.1 53.4 49.8 47.7 23 2023-11-29 14:00:00 01:00:00.0 01:00:00.0 00:00:00.0 58.0 44.0 14:21:02 83.5 14:46:42 63.0 56.5 52.4 49.5 46.7 45.0 24 2023-11-29 15:00:00 01:00:00.0 01:00:00.0 00:00:00.0 53.9 44.1 15:30:05 75.7 15:40:09 61.2 56.9 52.1 49.0 46.7 45.7 Apx-31
/0 /1 /2 /3 /4 /5 /1 /6/1 /7 /8 □ /10 /1 /11 /12 /5 /8
/13 /14 /15 /16 /17 /18 □ /20 /21 /22/22/23 /17 /24
/0 /1 /8 /1 /5 /25 /3 □ /26 /27 /28 /1 □ /29 /2 /6/1/30 /31 /32 /33 /34 /2 /8 /2 /35 /36 /37 /37 /35 /3/38 /12 /6/11 /4 /8 /1 /5 /25 /3 □ /26 /27 /28 /1 □ /29 /2 /6/1/30 /31 /32 /33 /39 /39 /39 /36 /39 /40 /40 /41 /42 /39 /42 /36 /43 /43 /42 /44 □ /43 /37 /39 /39 /39 /39 /41 /30 /31 /32 /33 /34 /2 /8 /2 /35 /36 /37 /37 /35 /28 /45 /46 /27 /7 /0 /1 /8 /1 /5 /30 /31 /32 /43 /39 /39 /39 /36 /39 /40 /40 /26 /27 /5 /6/47 /2 /5 /1/42 /35 /48 /39 /48
/49 /3 /1 /5 /50 /2 /7 □ /51 /45 /47 /2 /5 /45 □ /52 /2 /28 /28 /2 /53 /54 /1 /5 /30 /12 /55 /2 /8 /27 /12 /7/30 /32 /29 /0 /43 □ /36 /36 /56 /48 /39 /25 /36 /57 /35 /58 /44 /59 /29 □ /43 /43 /57 /56 /43 /40 /25 /48 /42 /35 /58 /37 /59 /60 /61 /12 /46 □ /34 /1 /3 /55 /5 /27 /11 /8 /27 /12 /7/42 /48 □ /54 /12 /4 /5 □ /7 /12 /27 /3 /1 □ /6/1 /2 /3 /4 /5 /1 /6/1 /7 /8 □ /62 □ /42 /48 □ /31 □ /43 □ /54 /12 /4 /5 /3 □ /63 /29 /12 /8 /1 /52 /2 /7 /45 /45 /27 /7 /27 □ /64 /5 /12 /65 /1 /55 /8 /66 /43 /40 /37 /44 /57 □ /26 /28 /1 /6/27 /7 /53 □ /38 /12 /7 /55 /5 /1 /8 /1 □ /64 /4 /6/11 /27 /7 /53 □ /32 /5 /4 /55 /67 □ /68 /2 /5 /45 /69 □ /30 /2 /67 /1 □ /51 /28 /3 /27 /7 /12 /5 /1 /35 /70 /8 /2 /5 /8 □ /32 /27 /6/1/42 /39 /42 /36 /41 /43 /43 /41 /42 /44 □ /43 /37 /71 /39 /39 /71 /39 /39/34 /4 /5 /2 /8 /27 /12 /7/42 /48 /71 /39 /39 /71 /39 /39 /35 /39 /51 /7 /45 □ /32 /27 /6/1/42 /39 /42 /36 /41 /43 /43 /41 /42 /40 □ /43 /37 /71 /39 /39 /71 /39 /39/10 /4 /7 □ /32 /27 /6/1/42 /48 /71 /39 /39 /71 /39 /39 /35 /39/64 /2 /4 /3 /1 □ /32 /27 /6/1/39 /71 /39 /39 /71 /39 /39 /35 /39 □
/13 /14 /72 /21 /73 /18 /72
/74 /75 /1 /5 /2 /28 /28 □ /0 /1 /8 /5 /27 /55 /3
/30 /76 /1 /77 /58 /57 /35 /36 □ /45 /78
/30 /76 /51 /43 /39 /37 /35 /57 □ /45 /78/70 /51 /76 /41 /41 /41 □ /45 /78 /51 /76 /58 /35 /42 □ /6/64 /2 /79 /54/30 /76 /26 /32 /0 /58 /58 /40 /35 /58 □ /45 /78 /51 /76 /44 /43 /35 /57 □ /6/64 /2 /79 /54
/51 /76 /48 /39 /44 /35 /57 □ /6/64 /2 /79 /54
/30 /76 /11 /1 /2 /67 /40 /37 /35 /48 □ /45 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /40 □ /43 /48 /71 /48 /37 /71 /48 /39 /30 /76 /70 /6/2 /31 /44 /36 /35 /58 □ /45 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /40 □ /43 /48 /71 /48 /37 /71 /48 /42 /30 /76 /70 /6/27 /7 /48 /42 /35 /44 □ /45 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /40 □ /43 /39 /71 /58 /58 /71 /39 /42 /30 /76 /1 /77 /58 /57 /35 /36 □ /45 /78
/30 /38 /1 /77 /37 /36 /35 /48 □ /45 /78/30 /38 /1 /77□ /41 □ /30 /76/1 /77 /37 /35 /39 □ /45 /78 /30 /76 /50 /1 /77 /58 /44 /35 /48 □ /45 /78/30 /76 /50 /1 /77□ /41 □ /30 /76/1 /77 /43 /35 /39 □ /45 /78 /51 /31 /55 /1 /1 /45 /2 /7 /55 /1 /3 /38 /12 /4 /7 /8 /34 /4 /5 /2 /8 /27 /12 /7 /30 /76 /70 □ /80 □ /37 /58 /35 /39 □ /45 /78/57 /43 /39 /71 /43 /43 /71 /48 /39 /35 /48 /30 /76 /70 □ /80 □ /44 /58 /35 /39 □ /45 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /30 /76 /11 /1 /2 /67 □ /80 □ /43 /36 /58 /35 /39 □ /45 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /30 /76 /11 /1 /2 /67 □ /80 □ /43 /36 /57 /35 /39 □ /45 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /30 /76 /11 /1 /2 /67 □ /80 □ /43 /48 /39 /35 /39 □ /45 /78/39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /38 /12 /6/6/4 /7 /27 /8 /81 □ /29 /12 /27 /3 /1 /30 /34 /29 /30 /34 /2 /81 /30 /29 /27 /53 /54 /8 /41 /41 /41 □ /45 /78 /41 /41 /41 □ /45 /78 /39 /35 /39 □ /45 /78 /30 /34 /51 /29 /30 /34 /2 /81 /30 /51 /75 /1 /30 /29 /27 /53 /54 /8 /41 /41 /41 □ /45 /78 /41 /41 /41 □ /45 /78 /41 /41 /41 □ /45 /78 /41 /41 /41 □ /45 /78 /76 /7 /81 □ /34 /2 /8 /2 /76 /38 /82
/30 /1 /75 /1 /28 /32 /27 /6/1 □ /70 /8 /2 /6/11 /30 /1 /75 /1 /28 /32 /27 /6/1 □ /70 /8 /2 /6/11 /30 /1 /75 /1 /28 /32 /27 /6/1 □ /70 /8 /2 /6/11 /30 /1 /77 /58 /57 /35 /36 □ /45 /78 /37 /36 /35 /48 □ /45 /78 /41 /41 /41 □ /45 /78 /30 /3 /62 /6/2 /31 /63 /44 /36 /35 /58 □ /45 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /40 □ /43 /48 /71 /48 /37 /71 /48 /42 /41 /41 /41 □ /45 /78 /41 /41 /41 □ /45 /78 /30 /70 /62 /6/27 /7 /63 /48 /42 /35 /44 □ /45 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /40 □ /43 /39 /71 /58 /58 /71 /39 /42 /41 /41 /41 □ /45 /78 /41 /41 /41 □ /45 /78 /30 /64 /1 /2 /67 /62 /6/2 /31 /63 /40 /37 /35 /48 □ /45 /78 /42 /39 /42 /36 /41 /43 /43 /41 /42 /40 □ /43 /48 /71 /48 /37 /71 /48 /39 /41 /41 /41 □ /45 /78 /41 /41 /41 □ /45 /78 /74 /75 /1 /5 /28 /12 /2 /45 /3 /38 /12 /4 /7 /8 /34 /4 /5 /2 /8 /27 /12 /7 /74 /78 /76 □ /38 /12 /4 /7 /8 /74 /78 /76 □ /34 /4 /5 /2 /8 /27 /12 /7 /39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /39 /39 /71 /39 /39 /71 /39 /39 /35 /39 /70 /8 /2 /8 /27 /3 /8 /27 /55 /3
/30 /76 /70 □ /42 /35 /39 /37 /36 /35 /43 □ /45 /78
/30 /76 /70 □ /44 /35 /39 /37 /43 /35 /43 □ /45 /78
/30 /76 /70 □ /42 /58 /35 /39/58 /44 /35 /42 □ /45 /78
/30 /76 /70 □ /58 /39 /35 /39/58 /58 /35 /36 □ /45 /78
/30 /76 /70 □ /40 /39 /35 /39/48 /40 /35 /39 □ /45 /78
/30 /76 /70 □ /40 /40 /35 /39/48 /37 /35 /43 □ /45 /78
Apx-32
/0 /1 /2 /1 /3 □ /5 /6
/7 /8 /9/1 □ /10 /8 /11 /12 /13 /14 /15
/16 /17 /18 /19 /19 /20 /19 /18 /19 /19 /20 /21 /22 □ /23 /13 /2 /19 /24 /18 /19 /19 /19 /25 /18 /19 /19 /16 /20 /18 /19 /19 /19
/20 /19
/24 /19
/17 /19
/25 /19
/16 /19 /19
/16 /20 /19
/16 /24 /19
/26 /14 /1 /27 /28 /1 /29 /30 /15
/31 /6 /32 □ /16 /33 /16 □ /0 /1 /27
/19 □ /5 /6 /20 /34 □ /5 /6 /34 /19 □ /5 /6 /35 /34 □ /5 /6 /16 /17 /18 /19 /19 /20 /19 /18 /19 /19 /20 /21 /22 □ /23 /13 /2 /19 /24 /18 /19 /19 /19 /25 /18 /19 /19 /16 /20 /18 /19 /19 /25 /10 /36
/16 /20 /34 /10 /36
/16 /37 /10 /36
/25 /37 /10 /36
/26 /14 /1 /27 /28 /1 /29 /30 /15
/31 /6 /32 □ /16 /33 /16 □ /0 /9/38 /39
/19 □ /5 /6 /20 /34 □ /5 /6 /34 /19 □ /5 /6 /35 /34 □ /5 /6 /16 /17 /18 /19 /19 /20 /19 /18 /19 /19 /20 /21 /22 □ /23 /13 /2 /19 /24 /18 /19 /19 /19 /25 /18 /19 /19 /16 /20 /18 /19 /19 /25 /10 /36
/16 /20 /34 /10 /36
/16 /37 /10 /36
/25 /37 /10 /36
Apx-33
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /12 □ /14 /15/16 /5
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /17 /17 /19 /17 /23 /17 /17 /19 /24 /25 □ /26 /27 /28 /17 /29 /23 /17 /17 /17 /30 /23 /17 /17 /12 /19 /23 /17 /17 /30 /31 /32
/12 /19 /20 /31 /32
/12 /33 /31 /32
/30 /33 /31 /32
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /34 □ /14 /2 /3
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /17 /17 /19 /17 /23 /17 /17 /19 /24 /25 □ /26 /27 /28 /17 /29 /23 /17 /17 /17 /30 /23 /17 /17 /12 /19 /23 /17 /17 /22 /25 /34 /31 /32
/12 /17 /17 /31 /32
/12 /33 /31 /32
/30 /33 /31 /32
/19 /17 /33 /31 /32
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /34 □ /14 /15/35 /36
/17 □ /18 /9 /19 /20 □ /18 /9 /20 /17 □ /18 /9 /21 /20 □ /18 /9 /12 /22 /23 /17 /17 /19 /17 /23 /17 /17 /19 /24 /25 □ /26 /27 /28 /17 /29 /23 /17 /17 /17 /30 /23 /17 /17 /12 /19 /23 /17 /17 /22 /25 /34 /31 /32
/12 /17 /17 /31 /32
/12 /33 /31 /32
/30 /33 /31 /32
/19 /17 /33 /31 /32
Apx-34
/0 /1 /2 /3 /4 /2 /5 /6 /7
/8 /9 /10 □ /12 /13 /14 □ /15 /16/17 /5
/18 □ /19 /9 /20 /21 □ /19 /9 /21 /18 □ /19 /9 /22 /21 □ /19 /9 /12 /23 /24 /18 /18 /20 /18 /24 /18 /18 /20 /25 /26 □ /27 /28 /29 /18 /30 /24 /18 /18 /18 /31 /24 /18 /18 /12 /20 /24 /18 /18 /23 /26 /14 /32 /33
/12 /18 /18 /32 /33
/12 /34 /32 /33
/31 /34 /32 /33
/20 /18 /34 /32 /33
Apx-35
APPENDIX D
CONSTRUCTION NOISE MODEL WORKSHEETS
Apx-36
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 480 40 0.40 -19.6 -4.0 65.4 61.4
Rubber Tired Dozers 1 82 480 40 0.40 -19.6 -4.0 62.4 58.4 Tractors/Loaders/Backhoes 1 84 480 40 0.40 -19.6 -4.0 64.4 60.4 Log Sum 65.0
Rubber Tired Dozers 1 82 480 40 0.40 -19.6 -4.0 62.4 58.4 Tractors/Loaders/Backhoes 2 84 480 40 0.80 -19.6 -1.0 64.4 63.4 Graders 1 85 480 40 0.40 -19.6 -4.0 65.4 61.4
Log Sum 66.3
Cranes 1 81 480 16 0.16 -19.6 -8.0 61.4 53.4
Forklifts2
1 48 480 40 0.40 -19.6 -4.0 28.4 24.4
Generator Sets 1 81 480 50 0.50 -19.6 -3.0 61.4 58.3
Welders 3 74 480 40 1.20 -19.6 0.8 54.4 55.1
Tractors/Loaders/Backhoes 1 84 480 40 0.40 -19.6 -4.0 64.4 60.4 Log Sum 63.7
Tractors/Loaders/Backhoes 1 84 480 40 0.40 -19.6 -4.0 64.4 60.4 Pavers 1 77 480 50 0.50 -19.6 -3.0 57.4 54.3
Paving Equipment 1 77 480 50 0.50 -19.6 -3.0 57.4 54.3
Rollers 1 80 480 20 0.20 -19.6 -7.0 60.4 53.4
Cement and Mortar Mixer 1 79 480 40 0.40 -19.6 -4.0 59.4 55.4 Log Sum 63.4
Air Compressors 1 78 480 40 0.40 -19.6 -4.0 58.4 54.4
Log Sum 54.4
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Architectural Coating
Building Construction
Paving
Receptor - Residential to the East (131 W Minthorn Street Lake Elsinore) Site Preparation
Grading
Apx-37
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 422 40 0.40 -18.5 -4.0 66.5 62.5
Rubber Tired Dozers 1 82 422 40 0.40 -18.5 -4.0 63.5 59.5 Tractors/Loaders/Backhoes 1 84 422 40 0.40 -18.5 -4.0 65.5 61.5 Log Sum 66.1
Rubber Tired Dozers 1 82 422 40 0.40 -18.5 -4.0 63.5 59.5 Tractors/Loaders/Backhoes 2 84 422 40 0.80 -18.5 -1.0 65.5 64.5 Graders 1 85 422 40 0.40 -18.5 -4.0 66.5 62.5
Log Sum 67.4
Cranes 1 81 422 16 0.16 -18.5 -8.0 62.5 54.5
Forklifts2
1 48 422 40 0.40 -18.5 -4.0 29.5 25.5
Generator Sets 1 81 422 50 0.50 -18.5 -3.0 62.5 59.5
Welders 3 74 422 40 1.20 -18.5 0.8 55.5 56.3
Tractors/Loaders/Backhoes 1 84 422 40 0.40 -18.5 -4.0 65.5 61.5 Log Sum 64.8
Tractors/Loaders/Backhoes 1 84 422 40 0.40 -18.5 -4.0 65.5 61.5 Pavers 1 77 422 50 0.50 -18.5 -3.0 58.5 55.5
Paving Equipment 1 77 422 50 0.50 -18.5 -3.0 58.5 55.5
Rollers 1 80 422 20 0.20 -18.5 -7.0 61.5 54.5
Cement and Mortar Mixer 1 79 422 40 0.40 -18.5 -4.0 60.5 56.5 Log Sum 64.5
Air Compressors 1 78 422 40 0.40 -18.5 -4.0 59.5 55.5
Log Sum 55.5
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Paving
Architectural Coating
Receptor - Commercial to Northwest (Mr. Nice Guy Marijuana Dispensary, 311 W Minthorn Street, Lake Elsinore) Grading
Building Construction
Site Preparation
Apx-38
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 357 40 0.40 -17.1 -4.0 67.9 63.9
Rubber Tired Dozers 1 82 357 40 0.40 -17.1 -4.0 64.9 60.9 Tractors/Loaders/Backhoes 1 84 357 40 0.40 -17.1 -4.0 66.9 62.9 Log Sum 67.6
Rubber Tired Dozers 1 82 357 40 0.40 -17.1 -4.0 64.9 60.9 Tractors/Loaders/Backhoes 2 84 357 40 0.80 -17.1 -1.0 66.9 66.0 Graders 1 85 357 40 0.40 -17.1 -4.0 67.9 63.9
Log Sum 68.8
Cranes 1 81 357 16 0.16 -17.1 -8.0 63.9 56.0
Forklifts2
1 48 357 40 0.40 -17.1 -4.0 30.9 26.9
Generator Sets 1 81 357 50 0.50 -17.1 -3.0 63.9 60.9
Welders 3 74 357 40 1.20 -17.1 0.8 56.9 57.7
Tractors/Loaders/Backhoes 1 84 357 40 0.40 -17.1 -4.0 66.9 62.9 Log Sum 66.2
Tractors/Loaders/Backhoes 1 84 357 40 0.40 -17.1 -4.0 66.9 62.9 Pavers 1 77 357 50 0.50 -17.1 -3.0 59.9 56.9
Paving Equipment 1 77 357 50 0.50 -17.1 -3.0 59.9 56.9
Rollers 1 80 357 20 0.20 -17.1 -7.0 62.9 55.9
Cement and Mortar Mixer 1 79 357 40 0.40 -17.1 -4.0 61.9 57.9 Log Sum 66.0
Air Compressors 1 78 357 40 0.40 -17.1 -4.0 60.9 56.9
Log Sum 56.9
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Receptor - Commercial to Northeast (233 W Minthorn Street, Lake Elsinore) Site Preparation
Grading
Architectural Coating
Building Construction
Paving
Apx-39
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 88 40 0.40 -4.9 -4.0 80.1 76.1
Rubber Tired Dozers 1 82 88 40 0.40 -4.9 -4.0 77.1 73.1 Tractors/Loaders/Backhoes 1 84 88 40 0.40 -4.9 -4.0 79.1 75.1 Log Sum 79.7
Rubber Tired Dozers 1 82 88 40 0.40 -4.9 -4.0 77.1 73.1 Tractors/Loaders/Backhoes 2 84 88 40 0.80 -4.9 -1.0 79.1 78.1 Graders 1 85 88 40 0.40 -4.9 -4.0 80.1 76.1
Log Sum 81.0
Cranes 1 81 88 16 0.16 -4.9 -8.0 76.1 68.1
Forklifts2
1 48 88 40 0.40 -4.9 -4.0 43.1 39.1
Generator Sets 1 81 88 50 0.50 -4.9 -3.0 76.1 73.1
Welders 3 74 88 40 1.20 -4.9 0.8 69.1 69.9
Tractors/Loaders/Backhoes 1 84 88 40 0.40 -4.9 -4.0 79.1 75.1 Log Sum 78.4
Tractors/Loaders/Backhoes 1 84 88 40 0.40 -4.9 -4.0 79.1 75.1 Pavers 1 77 88 50 0.50 -4.9 -3.0 72.1 69.1
Paving Equipment 1 77 88 50 0.50 -4.9 -3.0 72.1 69.1
Rollers 1 80 88 20 0.20 -4.9 -7.0 75.1 68.1
Cement and Mortar Mixer 1 79 88 40 0.40 -4.9 -4.0 74.1 70.1 Log Sum 78.2
Air Compressors 1 78 88 40 0.40 -4.9 -4.0 73.1 69.1
Log Sum 69.1
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Receptor - Industrial to East (522 N Riley Street, Lake Elsinore) Site Preparation
Grading
Architectural Coating
Building Construction
Paving
Apx-40
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 528 40 0.40 -20.5 -4.0 64.5 60.5
Rubber Tired Dozers 1 82 528 40 0.40 -20.5 -4.0 61.5 57.5 Tractors/Loaders/Backhoes 1 84 528 40 0.40 -20.5 -4.0 63.5 59.5 Log Sum 64.2
Rubber Tired Dozers 1 82 528 40 0.40 -20.5 -4.0 61.5 57.5 Tractors/Loaders/Backhoes 2 84 528 40 0.80 -20.5 -1.0 63.5 62.6 Graders 1 85 528 40 0.40 -20.5 -4.0 64.5 60.5
Log Sum 65.4
Cranes 1 81 528 16 0.16 -20.5 -8.0 60.5 52.6
Forklifts2
1 48 528 40 0.40 -20.5 -4.0 27.5 23.5
Generator Sets 1 81 528 50 0.50 -20.5 -3.0 60.5 57.5
Welders 3 74 528 40 1.20 -20.5 0.8 53.5 54.3
Tractors/Loaders/Backhoes 1 84 528 40 0.40 -20.5 -4.0 63.5 59.5 Log Sum 62.8
Tractors/Loaders/Backhoes 1 84 528 40 0.40 -20.5 -4.0 63.5 59.5 Pavers 1 77 528 50 0.50 -20.5 -3.0 56.5 53.5
Paving Equipment 1 77 528 50 0.50 -20.5 -3.0 56.5 53.5
Rollers 1 80 528 20 0.20 -20.5 -7.0 59.5 52.5
Cement and Mortar Mixer 1 79 528 40 0.40 -20.5 -4.0 58.5 54.5 Log Sum 62.6
Air Compressors 1 78 528 40 0.40 -20.5 -4.0 57.5 53.5
Log Sum 53.5
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Receptor - Residential to East (520 N Spring Street, Lake Elsinore) Site Preparation
Grading
Architectural Coating
Building Construction
Paving
Apx-41
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 763 40 0.40 -23.7 -4.0 61.3 57.3
Rubber Tired Dozers 1 82 763 40 0.40 -23.7 -4.0 58.3 54.3 Tractors/Loaders/Backhoes 1 84 763 40 0.40 -23.7 -4.0 60.3 56.3 Log Sum 61.0
Rubber Tired Dozers 1 82 763 40 0.40 -23.7 -4.0 58.3 54.3 Tractors/Loaders/Backhoes 2 84 763 40 0.80 -23.7 -1.0 60.3 59.4 Graders 1 85 763 40 0.40 -23.7 -4.0 61.3 57.3
Log Sum 62.2
Cranes 1 81 763 16 0.16 -23.7 -8.0 57.3 49.4
Forklifts2
1 48 763 40 0.40 -23.7 -4.0 24.3 20.3
Generator Sets 1 81 763 50 0.50 -23.7 -3.0 57.3 54.3
Welders 3 74 763 40 1.20 -23.7 0.8 50.3 51.1
Tractors/Loaders/Backhoes 1 84 763 40 0.40 -23.7 -4.0 60.3 56.3 Log Sum 59.6
Tractors/Loaders/Backhoes 1 84 763 40 0.40 -23.7 -4.0 60.3 56.3 Pavers 1 77 763 50 0.50 -23.7 -3.0 53.3 50.3
Paving Equipment 1 77 763 50 0.50 -23.7 -3.0 53.3 50.3
Rollers 1 80 763 20 0.20 -23.7 -7.0 56.3 49.3
Cement and Mortar Mixer 1 79 763 40 0.40 -23.7 -4.0 55.3 51.3 Log Sum 59.4
Air Compressors 1 78 763 40 0.40 -23.7 -4.0 54.3 50.3
Log Sum 50.3
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Receptor - Residential to Southeast (109 W Flint Street, Lake Elsinore) Site Preparation
Grading
Architectural Coating
Building Construction
Paving
Apx-42
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 733 40 0.40 -23.3 -4.0 61.7 57.7
Rubber Tired Dozers 1 82 733 40 0.40 -23.3 -4.0 58.7 54.7 Tractors/Loaders/Backhoes 1 84 733 40 0.40 -23.3 -4.0 60.7 56.7 Log Sum 61.3
Rubber Tired Dozers 1 82 733 40 0.40 -23.3 -4.0 58.7 54.7 Tractors/Loaders/Backhoes 2 84 733 40 0.80 -23.3 -1.0 60.7 59.7 Graders 1 85 733 40 0.40 -23.3 -4.0 61.7 57.7
Log Sum 62.6
Cranes 1 81 733 16 0.16 -23.3 -8.0 57.7 49.7
Forklifts2
1 48 733 40 0.40 -23.3 -4.0 24.7 20.7
Generator Sets 1 81 733 50 0.50 -23.3 -3.0 57.7 54.7
Welders 3 74 733 40 1.20 -23.3 0.8 50.7 51.5
Tractors/Loaders/Backhoes 1 84 733 40 0.40 -23.3 -4.0 60.7 56.7 Log Sum 60.0
Tractors/Loaders/Backhoes 1 84 733 40 0.40 -23.3 -4.0 60.7 56.7 Pavers 1 77 733 50 0.50 -23.3 -3.0 53.7 50.7
Paving Equipment 1 77 733 50 0.50 -23.3 -3.0 53.7 50.7
Rollers 1 80 733 20 0.20 -23.3 -7.0 56.7 49.7
Cement and Mortar Mixer 1 79 733 40 0.40 -23.3 -4.0 55.7 51.7 Log Sum 59.7
Air Compressors 1 78 733 40 0.40 -23.3 -4.0 54.7 50.7
Log Sum 50.7
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Receptor - Residential to Southwest (416 N Langstaff Street, Lake Elsinore) Site Preparation
Grading
Architectural Coating
Building Construction
Paving
Apx-43
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 223 40 0.40 -13.0 -4.0 72.0 68.0
Rubber Tired Dozers 1 82 223 40 0.40 -13.0 -4.0 69.0 65.0 Tractors/Loaders/Backhoes 1 84 223 40 0.40 -13.0 -4.0 71.0 67.0 Log Sum 71.6
Rubber Tired Dozers 1 82 223 40 0.40 -13.0 -4.0 69.0 65.0 Tractors/Loaders/Backhoes 2 84 223 40 0.80 -13.0 -1.0 71.0 70.0 Graders 1 85 223 40 0.40 -13.0 -4.0 72.0 68.0
Log Sum 72.9
Cranes 1 81 223 16 0.16 -13.0 -8.0 68.0 60.1
Forklifts2
1 48 223 40 0.40 -13.0 -4.0 35.0 31.0
Generator Sets 1 81 223 50 0.50 -13.0 -3.0 68.0 65.0
Welders 3 74 223 40 1.20 -13.0 0.8 61.0 61.8
Tractors/Loaders/Backhoes 1 84 223 40 0.40 -13.0 -4.0 71.0 67.0 Log Sum 70.3
Tractors/Loaders/Backhoes 1 84 223 40 0.40 -13.0 -4.0 71.0 67.0 Pavers 1 77 223 50 0.50 -13.0 -3.0 64.0 61.0
Paving Equipment 1 77 223 50 0.50 -13.0 -3.0 64.0 61.0
Rollers 1 80 223 20 0.20 -13.0 -7.0 67.0 60.0
Cement and Mortar Mixer 1 79 223 40 0.40 -13.0 -4.0 66.0 62.0 Log Sum 70.1
Air Compressors 1 78 223 40 0.40 -13.0 -4.0 65.0 61.0
Log Sum 61.0
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Receptor - Commercial to West (Lake Elsinore Public Works, 521 N Langstaff Street, Lake Elsinore) Site Preparation
Grading
Architectural Coating
Building Construction
Paving
Apx-44
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 345 40 0.40 -16.8 -4.0 68.2 64.2
Rubber Tired Dozers 1 82 345 40 0.40 -16.8 -4.0 65.2 61.2 Tractors/Loaders/Backhoes 1 84 345 40 0.40 -16.8 -4.0 67.2 63.2 Log Sum 67.9
Rubber Tired Dozers 1 82 345 40 0.40 -16.8 -4.0 65.2 61.2 Tractors/Loaders/Backhoes 2 84 345 40 0.80 -16.8 -1.0 67.2 66.3 Graders 1 85 345 40 0.40 -16.8 -4.0 68.2 64.2
Log Sum 69.1
Cranes 1 81 345 16 0.16 -16.8 -8.0 64.2 56.3
Forklifts2
1 48 345 40 0.40 -16.8 -4.0 31.2 27.2
Generator Sets 1 81 345 50 0.50 -16.8 -3.0 64.2 61.2
Welders 3 74 345 40 1.20 -16.8 0.8 57.2 58.0
Tractors/Loaders/Backhoes 1 84 345 40 0.40 -16.8 -4.0 67.2 63.2 Log Sum 66.5
Tractors/Loaders/Backhoes 1 84 345 40 0.40 -16.8 -4.0 67.2 63.2 Pavers 1 77 345 50 0.50 -16.8 -3.0 60.2 57.2
Paving Equipment 1 77 345 50 0.50 -16.8 -3.0 60.2 57.2
Rollers 1 80 345 20 0.20 -16.8 -7.0 63.2 56.2
Cement and Mortar Mixer 1 79 345 40 0.40 -16.8 -4.0 62.2 58.2 Log Sum 66.3
Air Compressors 1 78 345 40 0.40 -16.8 -4.0 61.2 57.2
Log Sum 57.2
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Receptor - Residential to West (513 N Langstaff Street, Lake Elsinore) Site Preparation
Grading
Architectural Coating
Building Construction
Paving
Apx-45
Construction Phase Equipment Item # of Items Item Lmax at 50 feet, dBA1 Distance to Receptor3 Item Usage Percent Usage Factor Dist. Correction dB Usage Adj. dB Receptor Item Lmax, dBA Receptor Item Leq, dBA Graders 1 85 447 40 0.40 -19.0 -4.0 66.0 62.0
Rubber Tired Dozers 1 82 447 40 0.40 -19.0 -4.0 63.0 59.0 Tractors/Loaders/Backhoes 1 84 447 40 0.40 -19.0 -4.0 65.0 61.0 Log Sum 65.6
Rubber Tired Dozers 1 82 447 40 0.40 -19.0 -4.0 63.0 59.0 Tractors/Loaders/Backhoes 2 84 447 40 0.80 -19.0 -1.0 65.0 64.0 Graders 1 85 447 40 0.40 -19.0 -4.0 66.0 62.0
Log Sum 66.9
Cranes 1 81 447 16 0.16 -19.0 -8.0 62.0 54.0
Forklifts2
1 48 447 40 0.40 -19.0 -4.0 29.0 25.0
Generator Sets 1 81 447 50 0.50 -19.0 -3.0 62.0 59.0
Welders 3 74 447 40 1.20 -19.0 0.8 55.0 55.8
Tractors/Loaders/Backhoes 1 84 447 40 0.40 -19.0 -4.0 65.0 61.0 Log Sum 64.3
Tractors/Loaders/Backhoes 1 84 447 40 0.40 -19.0 -4.0 65.0 61.0 Pavers 1 77 447 50 0.50 -19.0 -3.0 58.0 55.0
Paving Equipment 1 77 447 50 0.50 -19.0 -3.0 58.0 55.0
Rollers 1 80 447 20 0.20 -19.0 -7.0 61.0 54.0
Cement and Mortar Mixer 1 79 447 40 0.40 -19.0 -4.0 60.0 56.0 Log Sum 64.0
Air Compressors 1 78 447 40 0.40 -19.0 -4.0 59.0 55.0
Log Sum 55.0
Notes:
(1) Source: Referenced noise levels from the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Construction Noise Model User's Guide (January 2006). (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site. Construction noise projected from the center of the project site to nearest sensitive use (property line).
Architectural Coating
Building Construction
Paving
Receptor - Residential to West (508 N Langstaff Street, Lake Elsinore) Site Preparation
Grading
Apx-46
APPENDIX E
SOUNDPLAN WORKSHEETS
Apx-47
Level Frequency spectrum [dB(A)] Corrections
Source name Reference Day 31 63 125 250 500 1 2 4 8 16 Cwall CI CT dB(A) Hz Hz Hz Hz Hz kHz kHz kHz kHz kHz dB dB dB
HVAC1 Lw/unit - 42.5 46.5 59.5 64.5 58.5 69.5 71.5 70.5 72.5 72.5 - - - HAVAC2 Lw/unit - 42.5 46.5 59.5 64.5 58.5 69.5 71.5 70.5 72.5 72.5 - - - HVAC3 Lw/unit - 42.5 46.5 59.5 64.5 58.5 69.5 71.5 70.5 72.5 72.5 - - - HVAC4 Lw/unit - 42.5 46.5 59.5 64.5 58.5 69.5 71.5 70.5 72.5 72.5 - - - HVAC5 Lw/unit - 42.5 46.5 59.5 64.5 58.5 69.5 71.5 70.5 72.5 72.5 - - - HVAC6 Lw/unit - 42.5 46.5 59.5 64.5 58.5 69.5 71.5 70.5 72.5 72.5 - - - HVAC7 Lw/unit - 42.5 46.5 59.5 64.5 58.5 69.5 71.5 70.5 72.5 72.5 - - - HVAC8 Lw/unit - 42.5 46.5 59.5 64.5 58.5 69.5 71.5 70.5 72.5 72.5 - - - Noise emissions of industry sources
GANDDINI GROUP, INC. 550 Parkcenter Drive, Suite 202 Santa Ana CA 92705 USA Apx-48
Movements Separated Lw,ref
Name Parking lot type Size per hour Road surface method Day dB(A)
P1 Motorway station (resting trucks) 12 Parking bays 6.000 Asphaltic driving lanes no 89.0 P2 Visitors and staff 13 Parking bays 1.300 Asphaltic driving lanes no 75.6 Noise emissions of parking lot traffic
GANDDINI GROUP, INC. 550 Parkcenter Drive, Suite 202 Santa Ana CA 92705 USA Apx-49
Building Limit Level Conflict
No. Receiver name side Floor Day Day Day
dB(A) dB(A) dB
1 1 - EG - 37.8 -
2 2 - EG - 36.5 -
3 3 - EG - 39.6 -
4 4 - EG - 39.6 -
5 5 - EG - 43.9 -
6 6 - EG - 35.8 -
7 7 - EG - 43.3 -
8 8 - EG - 41.2 -
Receiver list
GANDDINI GROUP, INC. 550 Parkcenter Drive, Suite 202 Santa Ana CA 92705 USA Apx-50
APPENDIX F
FHWA TRAFFIC NOISE MODEL WORKSHEETS
Apx-51
Existing Traffic Noise
Project: 19687 Fleming Concrete Pumping Truck Yard
Road: Minthorn Street
Segment: In vicinity of project site
DAYTIME EVENING NIGHTTIME ADT 10050.00
AUTOS M.TRUCKS H.TRUCKS AUTOS M.TRUCKS H.TRUCKS AUTOS M.TRUCKS H.TRUCKS SPEED 40.00 -------------------------------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- DISTANCE 25.00
INPUT PARAMETERS
Vehicles per hour 616.36 7.54 2.93 455.50 1.34 1.34 114.09 10.05 3.91 % A 97.4 Speed in MPH 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 Left angle -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 Right angle 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 % MT 1.84
NOISE CALCULATIONS
Reference levels 67.36 76.31 81.16 67.36 76.31 81.16 67.36 76.31 81.16 % HT 0.74
ADJUSTMENTS
Flow 21.57 2.45 -1.66 20.26 -5.06 -5.05 14.25 3.69 -0.41 Distance 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 LEFT -90.00 Finite Roadway 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 RIGHT 90.00 Barrier 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CNEL 71.14 Constant -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 DAY LEQ 67.70 LEQ 66.87 56.70 57.44 65.56 49.19 54.05 59.55 57.95 58.69 Day hour 89.00 Absorbtive? no
DAY LEQ 67.70 EVENING LEQ 65.95 NIGHT LEQ 63.55 Use hour? no GRADE dB 0.00
CNEL 71.14
FHWA Traffic Noise Prediction Model FHWA-RD-77-108
Apx-52
FHWA Traffic Noise Prediction Model FHWA-RD-77-108
Existing Plus Project Traffic Noise
Project: 19687 Fleming Concrete Pumping Truck Yard
Road: Minthorn Street
Segment: In vicinity of project site
DAYTIME EVENING NIGHTTIME ADT 10138.00
AUTOS M.TRUCKS H.TRUCKS AUTOS M.TRUCKS H.TRUCKS AUTOS M.TRUCKS H.TRUCKS SPEED 40.00 --------------------------------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- DISTANCE 25.00
INPUT PARAMETERS
Vehicles per hour 621.52 7.54 3.17 459.32 1.34 1.45 115.05 10.05 4.22 % A 97.36 Speed in MPH 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 Left angle -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 Right angle 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 % MT 1.82
NOISE CALCULATIONS
Reference levels 67.36 76.31 81.16 67.36 76.31 81.16 67.36 76.31 81.16 % HT 0.79
ADJUSTMENTS
Flow 21.61 2.45 -1.32 20.29 -5.06 -4.71 14.28 3.69 -0.07 Distance 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 LEFT -90.00 Finite Roadway 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 RIGHT 90.00 Barrier 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CNEL 71.24 Constant -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 DAY LEQ 67.76 LEQ 66.91 56.70 57.78 65.59 49.19 54.39 59.58 57.95 59.03 Day hour 89.00 Absorbtive? no
DAY LEQ 67.76 EVENING LEQ 66.00 NIGHT LEQ 63.68 Use hour? no GRADE dB 0.00
CNEL 71.24
Apx-53
Existing Traffic Noise
Project: 19687 Fleming Concrete Pumping Truck Yard
Road: Riley Street
Segment: South of Minthorn Street
DAYTIME EVENING NIGHTTIME ADT 25700.00
AUTOS M.TRUCKS H.TRUCKS AUTOS M.TRUCKS H.TRUCKS AUTOS M.TRUCKS H.TRUCKS SPEED 25.00 -------------------------------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- DISTANCE 20.00
INPUT PARAMETERS
Vehicles per hour 1576.17 19.27 7.50 1164.81 3.42 3.43 291.76 25.70 10.00 % A 97.4 Speed in MPH 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 Left angle -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 Right angle 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 % MT 1.84
NOISE CALCULATIONS
Reference levels 59.44 71.09 77.24 59.44 71.09 77.24 59.44 71.09 77.24 % HT 0.74
ADJUSTMENTS
Flow 27.69 8.56 4.46 26.38 1.06 1.07 20.37 9.81 5.71
Distance 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91 LEFT -90.00 Finite Roadway 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 RIGHT 90.00 Barrier 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CNEL 72.18 Constant -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 DAY LEQ 67.70 LEQ 66.04 58.56 60.61 64.73 51.05 57.22 58.71 59.81 61.86 Day hour 89.00 Absorbtive? no
DAY LEQ 67.70 EVENING LEQ 65.59 NIGHT LEQ 65.10 Use hour? no GRADE dB 0.00
CNEL 72.18
FHWA Traffic Noise Prediction Model FHWA-RD-77-108
Apx-54
FHWA Traffic Noise Prediction Model FHWA-RD-77-108
Existing Plus Project Traffic Noise
Project: 19687 Fleming Concrete Pumping Truck Yard
Road: Riley Street
Segment: South of Minthorn Street
DAYTIME EVENING NIGHTTIME ADT 25788.00
AUTOS M.TRUCKS H.TRUCKS AUTOS M.TRUCKS H.TRUCKS AUTOS M.TRUCKS H.TRUCKS SPEED 25.00 --------------------------------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- ----------------------- DISTANCE 20.00
INPUT PARAMETERS
Vehicles per hour 1581.33 19.27 7.73 1168.63 3.42 3.54 292.72 25.70 10.31 % A 97.39 Speed in MPH 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 Left angle -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 -90.00 Right angle 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 % MT 1.83
NOISE CALCULATIONS
Reference levels 59.44 71.09 77.24 59.44 71.09 77.24 59.44 71.09 77.24 % HT 0.76
ADJUSTMENTS
Flow 27.70 8.56 4.60 26.39 1.06 1.20 20.38 9.81 5.85
Distance 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91 LEFT -90.00 Finite Roadway 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 RIGHT 90.00 Barrier 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CNEL 72.24 Constant -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 DAY LEQ 67.74 LEQ 66.05 58.56 60.75 64.74 51.05 57.35 58.73 59.81 62.00 Day hour 89.00 Absorbtive? no
DAY LEQ 67.74 EVENING LEQ 65.62 NIGHT LEQ 65.17 Use hour? no GRADE dB 0.00
CNEL 72.24
Apx-55
APPENDIX G
GROUNDBORNE VIBRATION WORKSHEETS
Apx-56
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Vibratory Roller
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.21 Reference PPV (in/sec) at 25 ft.
D = 225.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.008 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Commercial/Public Works to West
INPUT
1 Vibratory Roller INPUT SECTION IN GREEN
521 N Langstaff Street, Lake Elsinore
Apx-57
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Large Bulldozer
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.089 Reference PPV (in/sec) at 25 ft.
D = 225.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.003 IN/SEC OUTPUT IN BLUE
RESULTS
2 Large Bulldozer
GROUNDBORNE VIBRATION ANALYSIS
Commercial/Public Works to West
INPUT
INPUT SECTION IN GREEN
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
521 N Langstaff Street, Lake Elsinore
Apx-58
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Vibratory Roller
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.21 Reference PPV (in/sec) at 25 ft.
D = 363.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.004 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Single-Family Residential to West
513 N Langstaff Street, Lake Elsinore
INPUT
1 Vibratory Roller INPUT SECTION IN GREEN
Apx-59
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Large Bulldozer
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.089 Reference PPV (in/sec) at 25 ft.
D = 363.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.002 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Single-Family Residential to West
513 N Langstaff Street, Lake Elsinore
INPUT
2 Large Bulldozer INPUT SECTION IN GREEN
Apx-60
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Vibratory Roller
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.21 Reference PPV (in/sec) at 25 ft.
D = 352.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.004 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Multi-Family Residential to West
508 N Langstaff Street, Lake Elsinore
INPUT
1 Vibratory Roller INPUT SECTION IN GREEN
Apx-61
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Large Bulldozer
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.089 Reference PPV (in/sec) at 25 ft.
D = 352.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.002 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Multi-Family Residential to West
508 N Langstaff Street, Lake Elsinore
INPUT
2 Large Bulldozer INPUT SECTION IN GREEN
Apx-62
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Vibratory Roller
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.21 Reference PPV (in/sec) at 25 ft.
D = 322.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.005 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Single-Family Residential to Southwest
416 N Langstaff Street, Lake Elsinore
INPUT
1 Vibratory Roller INPUT SECTION IN GREEN
Apx-63
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Large Bulldozer
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.089 Reference PPV (in/sec) at 25 ft.
D = 322.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.002 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Single-Family Residential to Southwest
416 N Langstaff Street, Lake Elsinore
INPUT
2 Large Bulldozer INPUT SECTION IN GREEN
Apx-64
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Vibratory Roller
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.21 Reference PPV (in/sec) at 25 ft.
D = 40.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.104 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Commercial to East
522 N Riley Street, Lake Elsinore
INPUT
1 Vibratory Roller INPUT SECTION IN GREEN
Apx-65
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Large Bulldozer
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.089 Reference PPV (in/sec) at 25 ft.
D = 40.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.044 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Commercial to East
522 N Riley Street, Lake Elsinore
INPUT
2 Large Bulldozer INPUT SECTION IN GREEN
Apx-66
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Large Bulldozer
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.089 Reference PPV (in/sec) at 25 ft.
D = 152.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.006 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Commercial to Northeast
233 Minthorn Street, Lake Elsinore
INPUT
2 Large Bulldozer INPUT SECTION IN GREEN
Apx-67
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Vibratory Roller
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.21 Reference PPV (in/sec) at 25 ft.
D = 152.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.014 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Commercial to Northeast
233 Minthorn Street, Lake Elsinore
INPUT
1 Vibratory Roller INPUT SECTION IN GREEN
Apx-68
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Vibratory Roller
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.21 Reference PPV (in/sec) at 25 ft.
D = 43.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.093 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Commercial to North
311 Minthorn Street, Lake Elsinore
INPUT
1 Vibratory Roller INPUT SECTION IN GREEN
Apx-69
Project: 19687 Fleming Concrete Pumping Truck Yard Date: 11/6/23 Source: Large Bulldozer
Scenario: Unmitigated
Location:
Address:
PPV = PPVref(25/D)^n (in/sec)
Equipment =
Type
PPVref = 0.089 Reference PPV (in/sec) at 25 ft.
D = 43.00 Distance from Equipment to Receiver (ft)
n = 1.50 Vibration attenuation rate through the ground
PPV = 0.039 IN/SEC
Note: Based on reference equations from the Transportation and Construction Vibration Guidance Manual, California Department of Transportation, April 2020, pg 37.
RESULTS
OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Commercial to North
311 Minthorn Street, Lake Elsinore
INPUT
2 Large Bulldozer INPUT SECTION IN GREEN
Apx-70
GANDDINI GROUP INC.
714.795.3100 | ganddini.com
Fleming and Sons Concrete Yard Project Appendix D
City of Lake Elsinore Class 32 Exemption Checklist
Appendix D: Air Quality and Greenhouse Gas
Assessment
D
ATE: July 22, 2024
TO: Alan Fleming, AF Properties, LLC
FROM: Haseeb Qureshi
Ali Dadabhoy
Shannon Wong
JOB NO: 15715-03 AQ & GHG Assessment
FLEMING & SONS CONCRETE PUMPING, INC. TRUCK YARD AIR
QUALITY & GREENHOUSE GAS ASSESSMENT
Alan Fleming,
Urban Crossroads, Inc. is pleased to provide the following Air Quality & Greenhouse Gas Assessment for the Fleming & Sons Concrete Pumping, Inc. Truck Yard (Project), which is located on the southwest corner of the intersection of West Minthorn Street and North Riley Street in the City of Lake Elsinore (City) (Assessor’s Parcel Number APN 377-232-006, 377-232-007, and 377-232-009).
PROJECT OVERVIEW
The proposed P roject includes the development of a concrete pumping truck storage yard, minor maintenance, and administrative office building of approximately 7,500 square feet on a currently vacant 1. 65-acre site. The proposed Project is anticipated to have an opening year of 2024. The preliminary site plan for the proposed Project is shown on Exhibit 1.
The Project will have 10 -12 concrete pump semi -trucks parked on the site. Each day most will leave the yard and return. Trucks that are not working receive needed light duty maintenance such as tires, pipes, hoses, check and maintain fluids, fix mirror or windshield, etc. to be ready for use the following day. No major repair work is done on -site. Trucks will leave the yard, go directly to different jobsites each day, meet with concrete mixing trucks at the site and concrete is poured from the concrete truc ks through the pumps to place concrete at the jobsite. Trucks will be washed out and cleaned off-site before returning to the yard.
Trucks will also be re-fueled off-site. Sales and parts ordering personnel will work out of the administrative office. Typical operations will occur Monday through Friday (with occasional weekend operations) from 4:00 AM to 6:00 PM. There will be approximately 10-12 employees on the site at any given time.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
SUMMARY OF FINDINGS
Results of the assessment indicate that the Project would result in a less than significant with respect to air quality and greenhouse gases.
EXHIBIT 1: PRELIMINARY SITE PLAN
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
PROJECT AIR QUALITY IMPACTS
AIR QUALITY SETTING
SOUTH COAST AIR BASIN (SCAB)
The Project site is located in the SCAB within the jurisdiction of South Coast Air Quality Management District (SCAQMD) (1). The SCAQMD was created by the 1977 Lewis- Presley Air Quality Management Act, which merged four county air pollution control bodies into one regional district. Under the Act, the SCAQMD is responsible for bringing air quality in areas under its jurisdiction into conformity with federal and state air quality standards. As previously stated, the Project site is located within the SCAB, a 6,745 -square mile subregion of the SCAQMD, which includes portions of Los Angeles, Riverside, and San Bernardino Counties, and all of Orange County.
The SCAB is bounded by the Pacific Ocean to the west and the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east. The Los Angeles County portion of the Mojave Desert Air Basin is bounded by the San Gabriel Mountains to the south and west, the Los Angeles / Kern County border to the north, and the Los Angeles / San Bernardino County border to the east. The Riverside County portion of the Salton Sea Air Basin is bounded by the San Jacinto Mountains in the west and spans eastward up to the Palo Verde Valley.
Regional Climate
The regional climate has a substantial influence on air quality in the SCAB. In addition, the temperature, wind, humidity, precipitation, and amount of sunshine influence the air quality.
The annual average temperatures throughout the SCAB vary from the low to middle 60s degrees Fahrenheit (°F). Due to a decreased marine influence, the eastern portion of the SCAB shows greater variability in average annual minimum and maximum temperatures. January is the coldest month throughout the SCAB, with average minimum temperatures of 47°F in downtown Los Angeles and 36°F in San Bernardino. All portions of the SCAB have recorded maximum temperatures above 100°F.
Although the climate of the SCAB can be characterized as semi-arid, the air near the land surface is quite moist on most days because of the presence of a marine layer. This shallow layer of sea air is an important modifier of SCAB climate. Humidity restricts visibility in the SCAB, and the conversion of sulfur dioxide (SO
2) to sulfates (SO4) is heightened in air with high relative humidity.
The marine layer provides an environment for that conversion process, especially during the spring and summer months. The annual average relative humidity within the SCAB is 71 percent (%) along the coast and 59% inland. Since the ocean effect is dominant, periods of heavy early morning fog are frequent and low stratus clouds are a characteristic feature. These effects decrease with distance from the coast.
More than 90% of the SCAB’s rainfall occurs from November through April. The annual average rainfall varies from approximately nine inches in Riverside to fourteen inches in downtown Los Angeles. Monthly and yearly rainfall totals are extremely variable. Summer rainfall usually consists of widely scattered thunderstorms near the coast and slightly heavier shower activity in the eastern portion of the SCAB with frequency being higher near the coast.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
Due to its generally clear weather, about three -quarters of available sunshine is received in the SCAB. The remaining one-quarter is absorbed by clouds. The ultraviolet portion of this abundant radiation is a key factor in photochemical reactions. On th e shortest day of the year there are approximately 10 hours of possible sunshine, and on the longest day of the year there are approximately 14½ hours of possible sunshine.
The importance of wind to air pollution is considerable. The direction and speed of the wind determines the horizontal dispersion and transport of the air pollutants. During the late autumn to early spring rainy season, the SCAB is subjected to wind flow s associated with the traveling storms moving through the region from the northwest. This period also brings five to ten periods of strong, dry offshore winds, locally termed “Santa Anas” each year. During the dry season, which coincides with the months of maximum photochemical smog concentrations, the wind flow is bimodal, typified by a daytime onshore sea breeze and a nighttime offshore drainage wind.
Summer wind flows are created by the pressure differences between the relatively cold ocean and the unevenly heated and cooled land surfaces that modify the general northwesterly wind circulation over southern California. Nighttime drainage begins with the radiational cooling of the mountain slopes. Heavy, cool air descends the slopes and flows through the mountain passes and canyons as it follows the lowering terrain toward the ocean. Another characteristic wind regime in the SCAB is the “Catalina Eddy,” a low level cyclonic (counterclockwise) flow centered over Santa Catalina Island which results in an offshore flow to the southwest. On most spring and summer days, some indication of an eddy is apparent in coastal sections.
In the SCAB, there are two distinct temperature inversion structures that control vertical mixing of air pollution. During the summer, warm high-pressure descending (subsiding) air is undercut by a shallow layer of cool marine air. The boundary between these two layers of air is a persistent marine subsidence/inversion. This boundary prevents vertical mixing which effectively acts as an impervious lid to pollutants over the entire SCAB. The mixing height for the inversion structure is normally situated 1,000 to 1,500 feet above mean sea level.
A second inversion-type forms in conjunction with the drainage of cool air off the surrounding mountains at night followed by the seaward drift of this pool of cool air. The top of this layer forms a sharp boundary with the warmer air aloft and creates nocturnal radiation inversions.
These inversions occur primarily in the winter when nights are longer and onshore flow is weakest. They are typically only a few hundred feet above mean sea level. These inversions effectively trap pollutants, such as nitro gen oxides (NO X) and carbon monoxide (CO) from
vehicles, as the pool of cool air drifts seaward. Winter is therefore a period of high levels of primary pollutants along the coastline.
Wind Patterns and Project Location
The distinctive climate of the Project area and the SCAB is determined by its terrain and geographical location. The SCAB is located in a coastal plain with connecting broad valleys and low hills, bounded by the Pacific Ocean in the southwest quadrant with high mountains forming the remainder of the perimeter.
Wind patterns across the south coastal region are characterized by westerly and southwesterly onshore winds during the day and easterly or northeasterly breezes at night. Winds are characteristically light although the speed is somewhat greater during the dry summer months than during the rainy winter season.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
Criteria Pollutants
Both the U.S. Environmental Protection Agency (EPA) and the California Air Resources Board (CARB) have established ambient air quality standards for common pollutants. These ambient air quality standards are levels of contaminants representing safe levels that avoid specific adverse health effects associated with each pollutant. The ambient air quality standards cover what are called “criteria” pollutants because the health and other effects of each pollutant are described in criteria documents. The six criteria pollutants are ozone (O 3) (precursor emissions include NOX
and reactive organic gases (ROG), CO, particulate matter (PM), nitrogen dioxide (NO 2), sulfur dioxide (SO2), and lead. Areas that meet ambient air quality standards are classified as attainment areas, while areas that do not meet these standards are classified as nonattainment areas. The Riverside County portion of the SCAB is designated as a nonattainment area for the federal O 3 and PM2.5 standards and is also a nonattainment area for the state standards for O 3, PM10, and PM2.5.
Toxic Air Contaminants (TAC) Trend
In 1984, as a result of public concern for exposure to airborne carcinogens, CARB adopted regulations to reduce the amount of TAC emissions resulting from mobile and area sources, such as cars, trucks, stationary products, and consumer products. According to the Ambient and Emission Trends of Toxic Air Contaminants in California journal article (2) which was prepared for CARB, results show that between 1990-2012, ambient concentration and emission trends for the seven TACs responsible for most of the known cancer risk associated with airborne exposure in California have declined significantly (betwe en 1990 and 2012). The seven TACs studied include those that are derived from mobile sources: diesel particulate matter (DPM), benzene (C 6H6), and
1,3-butadiene (C4H6); those that are derived from stationary sources: perchloroethylene (C 2Cl4) and hexavalent chromium (Cr(VI)); and those derived from photochemical reactions of emitted VOCs: formaldehyde (CH
2O) and acetaldehyde (C 2H4O)1. The decline in ambient concentration and emission trends of these TACs are a result of various regulations CARB has implemented to address cancer risk.
Sensitive Receptor Locations
Some people are especially sensitive to air pollution and are given special consideration when evaluating air quality impacts from projects. These groups of people include children, the elderly, and individuals with pre-existing respiratory or cardiovascular illness. Structures that house these persons or places where they gather are defined as “sensitive receptors”. These structures typically include uses such as residences, hotels, and hospitals where an individual can remain for 24 hours. Consistent with the LST Methodology, the nearest land use where an individual could remain for 24 hours to the Project site has been used to determine construction and operational air quality impacts for emissions of PM
10 and PM2.5, since PM10 and PM2.5 thresholds
are based on a 24-hour averaging time.
Receptors in the Project study area are described below. All distances are measured from the Project site boundary to the outdoor living areas (e.g., backyards) or at the building façade,
1 It should be noted that ambient DPM concentrations are not measured directly. Rather, a surrogate method using the coefficient of haze (COH) and elemental carbon (EC) is used to estimate DPM concentrations.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
whichever is closer to the Project site. Receptors in the Project study area are shown on Exhibit 2 under the Localized Construction Emissions section later in the report. • Receptor R1 represents the existing residence at 508-C North Langstaff St, approximately 355 feet west of the Project site.
• Receptor R2 represents the existing residence at 416 North Langstaff St, approximately 455 feet southwest of the Project site.
• Receptor R3 represents an existing light industrial commercial building at 522 North Riley St, approximately 61 feet east of the Project site.
• Receptor R4 represents the existing commercial building at 18921 Collier Ave , approximately 65 feet north of the Project site.
• Receptor R5 represents the existing building at the City of Lake Elsinore Public Works facility located at 521 North Langstaff St, approximately 212 feet west of the Project site.
REGULATORY BACKGROUND
FEDERAL REGULATIONS
The EPA is responsible for setting and enforcing the national ambient air quality standards (NAAQS) for O 3, CO, NO X, SO2, PM10, and lead (Pb) (3). The EPA has jurisdiction over emissions sources that are under the authority of the federal government including aircraft, locomotives, and emissions sources outside state waters (Outer Continental Shelf). The EPA also establishes emission standards for vehicles sold in states other than California. Automobiles sold in California must meet the stricter emission requirements of CARB.
The Federal Clean Air Act (CAA) was first enacted in 1955 and has been amended numerous times in subsequent years (1963, 1965, 1967, 1970, 1977, and 1990). The CAA establishes the federal air quality standards, the NAAQS, and specifies future dates for achieving compliance (4). The CAA also mandates that each state submit and implement state implementation plans (SIPs) for local areas not meeting these standards. These plans must include pollution control measures that demonstrate how the standards will be met.
The 1990 amendments to the CAA that identify specific emission reduction goals for areas not meeting the NAAQS require a demonstration of reasonable further progress toward attainment and incorporate additional sanctions for failure to attain or to meet in terim milestones. The sections of the CAA most directly applicable to the development of the Project site include Title I (Non-Attainment Provisions) and Title II (Mobile Source Provisions) (5) (6). Title I provisions were established with the goal of attaining the NAAQS for the following criteria pollutants O 3, NO2, SO2,
PM10, CO, PM2.5, and Pb. The NAAQS were amended in July 1997 to include an additional standard for O3 and to adopt a NAAQS for PM2.5.
Mobile source emissions are regulated in accordance with Title II provisions. These provisions require the use of cleaner burning gasoline and other cleaner burning fuels such as methanol and natural gas. Automobile manufacturers are also required to reduce tailpipe emissions of hydrocarbons and NO
X. NOX is a collective term that includes all forms of NOX which are emitted as byproducts of the combustion process.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CALIFORNIA REGULATIONS
CARB
The CARB, which became part of the California EPA (CalEPA) in 1991, is responsible for ensuring implementation of the California Clean Air Act (AB 2595), responding to the federal CAA, and for regulating emissions from consumer products and motor vehicles. AB 2595 mandates achievement of the maximum degree of emissions reductions possible from vehicular and other mobile sources in order to attain the state ambient air quality standards by the earliest practical date. The CARB established the California ambient air quality standards (CAAQS) for all pollutants for which the federal government has NAAQS and, in addition, establishes standards for SO 4,
visibility, hydrogen sulfide (H2S), and vinyl chloride (C2H3Cl). However, at this time, H2S and C2H3Cl are not measured at any monitoring stations in the SCAB because they are not considered to be a regional air quality problem. Generally, the CAAQS are more stringent than the NAAQS (7) (8).
Local air quality management districts, such as the SCAQMD, regulate air emissions from stationary sources such as commercial and industrial facilities. All air pollution control districts have been formally designated as attainment or non-attainment for each CAAQS.
Serious non-attainment areas are required to prepare Air Quality Management Plans (AQMP) that include specified emission reduction strategies in an effort to meet clean air goals. These plans are required to include:
• Application of Best Available Retrofit Control Technology to existing sources; • Developing control programs for area sources (e.g., architectural coatings and solvents) and indirect sources (e.g. motor vehicle use generated by residential and commercial development);
• A District permitting system designed to allow no net increase in emissions from any new or modified permitted sources of emissions;
• Implementing reasonably available transportation control measures and assuring a substantial reduction in growth rate of vehicle trips and miles traveled; • Significant use of low emissions vehicles by fleet operators; • Sufficient control strategies to achieve a 5% or more annual reduction in emissions or 15% or more in a period of three years for ROGs, NO
X, CO and PM10. However, air basins
may use alternative emission reduction strategy that achieves a reduction of less than 5% per year under certain circumstances.
AQMP
Currently, the NAAQS and CAAQS are exceeded in most parts of the SCAB. In response, the SCAQMD has adopted a series of AQMP to meet the state and federal ambient air quality standards (9). AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
APPLICABLE REGULATORY REQUIRMENTS
SCAQMD Rules that are currently applicable during construction activity for this Project include but are not limited to Rule 403 (Fugitive Dust) and Rule 1113 (Architectural Coatings) (10) (11).
SCAQMD Rule 403
This rule is intended to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (human- made) fugitive dust sources by requiring actions to prevent and reduce fugitive dust emissions. Rule 403 applies to any activi ty or human -made condition capable of generating fugitive dust and requires best available control measures to be applied to earth moving and grading activities. This rule is intended to reduce PM 10 emissions from any
transportation, handling, construction, or storage activity that has the potential to generate fugitive dust. PM
10 suppression techniques are summarized below.
• Portions of a construction site to remain inactive longer than a period of three months will be seeded and watered until grass cover is grown or otherwise stabilized. • All onsite roads will be paved as soon as feasible or watered periodically or chemically stabilized.
• All material transported offsite will be either sufficiently watered or securely covered to prevent excessive amounts of dust.
• The area disturbed by clearing, grading, earthmoving, or excavation operations will be minimized at all times.
• Where vehicles leave a construction site and enter adjacent public streets, the streets will be swept daily or washed down at the end of the workday to remove soil tracked onto the paved surface.
SCAQMD Rule 1113
This rule serves to limit the volatile organic compound (VOC) content of architectural coatings used on projects in the SCAQMD. Any person who supplies, sells, offers for sale, or manufactures any architectural coating for use on projects in the SCAQMD mus t comply with the current VOC standards set in this rule.
METHODOLOGY
In May 202 3, the California Air Pollution Control Officers Association (CAPCOA) in conjunction with other California air districts, including SCAQMD, released the latest version of the CalEEMod Version 2022.1 .1.20. The purpose of this model is to calculate construction -source and operational-source criteria pollutant (VOCs, NO
X, SOX, CO, PM10, and PM 2.5) and GHG emissions
from direct and indirect sources; and quantify applicable air quality and GHG reductions achieved from mitigation measures (12). Accordingly, the latest version of CalEEMod has been used for this Project to determine construction and operational air quality and greenhouse gas emissions.
Standards of Significance
The criteria used to determine the significance of potential Project-related air quality impacts are taken from the California Environmental Quality Act Guidelines ( CEQA Guidelines ) (14 CCR Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
§§15000, et seq.). Based on these thresholds, a project would result in a significant impact related to air quality if it would (13):
• Threshold 1: Conflict with or obstruct implementation of the applicable air quality plan. • Threshold 2: Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non -attainment under an applicable federal or state ambient air quality standard.
• Threshold 3: Expose sensitive receptors to substantial pollutant concentrations. • Threshold 4 : Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.
AIR QUALITY REGIONAL EMISSIONS THRESHOLDS
The SCAQMD has developed regional significance thresholds for criteria pollutants, as summarized at Table 1 (14). The SCAQMD’s CEQA Air Quality Significance Thresholds ( March 2023) indicate that any projects in the South Coast Air Basin (SCAB) with daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact.
TABLE 1: MAXIMUM DAILY REGIONAL EMISSIONS THRESHOLDS
Pollutant Construction Operations
NOX 100 lbs/day 55 lbs/day
VOC 75 lbs/day 55 lbs/day
PM10 150 lbs/day 150 lbs/day
PM2.5 55 lbs/day 55 lbs/day
SOX 150 lbs/day 150 lbs/day
CO 550 lbs/day 550 lbs/day
lbs/day – Pounds Per Day
AIR QUALITY LOCALIZED EMISSIONS THRESHOLDS
For this Project, the appropriate SRA for the LST analysis is the SCAQMD Lake Elsinore monitoring station (SRA 25). LSTs apply to CO, NO2, PM10, and PM2.5. The SCAQMD produced look-up tables for projects less than or equal to 5 acres in size . The SCAQMD’s screening look- up tables are utilized in determining localized impacts. It should be noted that since the look-up tables identify thresholds at only 1 acre, 2 acres, and 5 acres, linear regression has been utilized to determine localized significance thresholds. Consistent with SCAQMD guidance, the thresholds presented in Table 2 were calculated by interpolating the threshold values for the Project’s disturbed acreage.
The acres disturbed is based on the equipment list and days in the site preparation and grading phase according to the anticipated maximum number of acres a given piece of equipment can pass over in an 8- hour workday. The equipment -specific grading rates are summarized in the CalEEMod user’s guide, Appendix A: Calculation Details for CalEEMod (15). It should be noted that Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
the disturbed area per day is representative of a piece of equipment making multiple passes over the same land area. In other words, one Rubber Tired Dozer can make multiple passes over the same land area totaling 0.5 acres in a given 8-hour day. Appendix A of the CalEEMod User Manual only identifies equipment -specific grading rates for Crawler Tractors, Graders, Rubber Tired Dozers, and Scrapers; therefore, Tractors/Loaders/Backhoes equipment that was included in the demolition, site preparation and grading phase was replaced with Crawler Tractors. For analytical purposes, emissions associated with peak site preparation and grading activities are considered for purposes of localized significance thresholds (LSTs) since this phase represents the maximum localized emissions that would occur. The Project’s construction activities could disturb a maximum of approximately 1.5 acres per day for site preparation and 2 acres per day for grading activities. Any other construction phases of development would result in lesser emissions and consequently lesser impacts than what is disclosed herein. As such, Table 2 presents thresholds for localized construction and operational emissions.
TABLE 2: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS
Source Activity
Emissions (lbs/day)
VOC NOX PM10 PM2.5
Construction
Site Preparation 198 lbs/day 925 lbs/day 20 lbs/day 37 lbs/day Grading 234 lbs/day 1,110 lbs/day 24 lbs/day 41 lbs/day Operations N/A 371 lbs/day 1,965 lbs/day 15 lbs/day 4 lbs/day 1Source of localized significance threshold (LSTs) is provided on page 16.
CONSTRUCTION ACTIVITIES
Construction activities associated with the Project would result in emissions of VOCs, NO X, SOX, CO, PM10, and PM2.5. Construction related emissions are expected from the following construction activities:
• Site Preparation
• Grading (Import/Export)
• Building Construction
• Paving
• Architectural Coating
GRADING ACTIVITIES
Dust is typically a major concern during grading activities. Because such emissions are not amenable to collection and discharge through a controlled source, they are called “fugitive emissions”. Fugitive dust emissions rates vary as a function of many par ameters (soil silt, soil moisture, wind speed, area disturbed, number of vehicles, depth of disturbance or excavation, etc.). CalEEMod was utilized to calculate fugitive dust emissions resulting from this phase of activity. Per client provided data, the Project would require 2,500 cubic yards of export for Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
earthwork activities. The CalEEMod default trip length of 20- miles will be used to analyze the emissions associated with export activities.
ON-ROAD TRIPS
Construction generates on-road vehicle emissions from vehicle usage for workers, vendors, and haul trucks commuting to and from the site. Worker and hauling trips are based on CalEEMod defaults. It should be noted that for vendor trips, specifically, CalEEMod only assigns vendor trips to the Building Construction phase. Vendor trips would likely occur during all phases of construction. As such, the CalEEMod d efaults for vendor trips have been adjusted based on a ratio of the total vendor trips to the number of days of each subphase of activity.
CONSTRUCTION DURATION
For purposes of analysis, construction of Project is expected to commence in April 2024 and would last through November 2024. The construction schedule utilized in the analysis represents a “worst-case” analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent
2. The duration of construction activity and
associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines (16).
CONSTRUCTION EQUIPMENT
CalEEMod default parameters for equipment has been used. Consistent with industry standards and typical construction practices, each piece of equipment will operate up to a total of eight (8) hours per day, or more than two -thirds of the period during which construction activities are allowed pursuant to the code.
OFF-SITE PROJECT SITE UTILITY AND INFRASTRUCTURE IMPROVEMENTS To support the Project development, there will be off -site improvements associated with street improvements and underground utilities . It is expected that the off -site construction activities would not take place at one location for the entire duration of construction. Impacts associated with these activities are not expected to exceed the emissions identified for Project -related construction activities since the off-site construction areas would have physical constraints such as, roadway travel lanes, traf fic signals, and sidewalks which would limit the amount of daily activity that could occur. The physical constraints would limit the amount of construction equipment that could be used, and any off-site and utility infrastructure construction would not use equipment totals that would exceed the equipment totals.
2 As shown in the CalEEMod User’s Guide Version 2022.1, Section 4.3 “Off-Road Equipment” as the analysis year increases, emission factors for the same equipment pieces decrease due to the natural turnover of older equipment being replaced by newer less polluting equipment and new regulatory requirements.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
REGIONAL CONSTRUCTION EMISSIONS SUMMARY
The estimated maximum daily construction emissions are summarized on Table 3, and as shown, the Project construction-source emissions would not exceed SCAQMD regional thresholds. Thus, the Project would result in a less than significant impact associated with construction activities.
Detailed construction model outputs are presented in Attachment A.
TABLE 3: REGIONAL CONSTRUCTION EMISSIONS SUMMARY
Source
Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
2024 2.13 24.74 18.57 0.06 4.79 2.38
Winter
2024 7.80 17.80 21.40 0.04 0.95 0.73
Maximum Daily Emissions 7.80 24.74 21.40 0.06 4.79 2.38 SCAQMD Regional Threshold 75 100 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
1PM10 and PM2.5 source emissions reflect 3x daily watering per SCAQMD Rule 403 for fugitive dust.
REGIONAL OPERATIONAL EMISSIONS
Operational activities associated with the Project would result in emissions of VOCs, NOX, CO, SOX, PM10, and PM2.5. Operational related emissions are expected from the following primary sources:
area source emissions, energy source emissions, and mobile source emissions.
The proposed Project related operational air quality impacts derive primarily from vehicle trips generated by the Project . Trip characteristics available from the Fleming & Sons Concrete Pumping, Inc. Truck Yard Trip Generation Assessment were utilized in this analysis (17). It should be noted that the Trip Generation Assessment assumed 4+ -axle Trucks only in an effort to conduct a conservative analysis.
To determine emissions from trucks for the proposed industrial use, the analysis incorporated the SCAQMD recommended truck trip length of 39.9 miles for 4+- axle (HHDT) trucks . The trip length function for trucks in CalEEMod has been revised to 3 9.9 miles, with an assumption of 100% primary trips for the proposed industrial land use.
The estimated operation-source emissions from the Project are summarized on Table 4. Detailed operation model outputs are presented in Attachment A. As shown on Table 4, operational - source emissions would not exceed the applicable SCAQMD regional thresholds for emissions of any criteria pollutant.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
TABLE 4: TOTAL PROJECT REGIONAL OPERATIONAL EMISSIONS
Source
Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
Mobile Source 0.35 1.06 3.99 0.02 0.95 0.25
Area Source 0.23 2.75E-03 0.33 1.95E-05 5.80E-04 4.38E-04 Energy Source 3.06E-03 0.06 0.05 3.33E-04 4.22E-03 4.22E-03 Total Maximum Daily Emissions 0.59 1.12 4.37 0.02 0.95 0.26 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Winter
Mobile Source 0.33 1.12 3.32 0.01 0.95 0.25
Area Source 0.18 0.00 0.00 0.00 0.00 0.00
Energy Source 3.06E-03 0.06 0.05 3.33E-04 4.22E-03 4.22E-03 Total Maximum Daily Emissions 0.52 1.17 3.37 0.02 0.95 0.26 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
SENSITIVE RECEPTORS
The analysis makes use of methodology included in the SCAQMD Final Localized Significance Threshold Methodology (LST Methodology) (18). The SCAQMD has established that impacts to air quality are significant if there is a potential to contribute or cause localized exceedances of the federal and/or state ambient air quality standards (NAAQS/CAAQS). Collectively, these are referred to as Lo calized Significance Thresholds (LSTs). The SCAQMD established LSTs in response to the SCAQMD Governing Board’s Environmental Justice Initiative I-4
3. LSTs represent
the maximum emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard at the sensitive receptor.
The SCAQMD states that lead agencies can use the LSTs as another indicator of significance in its air quality impact analyses. It should be noted that SCAQMD also states that Projects that are statutorily or categorically exempt under CEQA would not be subject to LST analyses. Projects exempt from CEQA also include infill projects that meet the H&S Code provisions. As such,
3 The purpose of SCAQMD’s Environmental Justice program is to ensure that everyone has the right to equal protection from air pollution and fair access to the decision-making process that works to improve the quality of air within their communities. Further, the SCAQMD defines Environmental Justice as “…equitable environmental policymaking and enforcement to protect the health of all residents, regardless of age, culture, ethnicity, gender, race, socioeconomic status, or geographic location, from the health effects of air pollution.” Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
although not required for this Project, LST analysis is presented to further underscore that there are in fact no significant impacts associated with the Project.
The SCAQMD recommends that the nearest sensitive receptor be considered when determining the Project’s potential to cause an individual or cumulatively significant impact. The nearest land use where an individual could remain for 24 hours to the Project site has been used to determine localized construction and operational air quality impacts for emissions of PM 10 and PM2.5 (since
PM10 and PM2.5 thresholds are based on a 24-hour averaging time). The nearest receptor used for evaluation of localized impacts of PM 10 and PM 2.5 is location R1, represented by the existing residence at 508-C North Langstaff St, approximately 355 feet (108 meters) west of the Project site. Receptors in the Project study area shown on Exhibit 2.
As previously stated, and consistent with LST Methodology, the nearest industrial/commercial use to the Project site is used to determine construction and operational LST air impacts for emissions of NO
X and CO as the averaging periods for these pollutants are shorter (8 hours or less) and it is reasonable to assume that an individual could be present at these sites for periods of one to 8 hours. The nearest receptor used for evaluation of localized impacts of NO X and CO is location R3, represented by an existing light industrial commercial building at 522 North Riley St, approximately 61 feet (19 meters) east of the Project site.
It should be noted that the LST Methodology explicitly states that “It is possible that a project may have receptors closer than 25 meters. Projects with boundaries located closer than 25 meters to the nearest receptor should use the LSTs for receptors located at 25 meters (18).” As such, for evaluation of localized NOx and CO, a 25-meter distance will be used.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
EXHIBIT 2: SENSITIVE RECEPTOR LOCATIONS
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
LOCALIZED CONSTRUCTION EMISSIONS
Table 5 identifies the localized impacts at the nearest receptor location in the vicinity of the Project. Outputs from the model runs for construction LSTs are provided in Attachment A. For analytical purposes, emissions associated with peak site preparation and grading activities are considered for purposes of LSTs since these phases represents the maximum localized emissions that would occur. Any other construction phases of development that overlap would result in less emissions and consequently less impacts than what is disclosed herein. As shown in Table 5, emissions resulting from the Project construction will not exceed the numerical thresholds of significance established by the SCAQMD for any criteria pollutant . Thus, a less than significant impact would occur for localized Project-related construction-source emissions and no mitigation is required.
TABLE 5: PROJECT LOCALIZED CONSTRUCTION IMPACTS
On-Site Emissions
Emissions (lbs/day)
NOX CO PM10 PM2.5
Site Preparation
Maximum Daily Emissions 16.14 14.15 2.81 1.67
SCAQMD Localized Threshold 198 925 20 37
Threshold Exceeded? NO NO NO NO
Grading
Maximum Daily Emissions 18.50 16.24 3.13 1.85
SCAQMD Localized Threshold 234 1,110 24 41
Threshold Exceeded? NO NO NO NO
LOCALIZED OPERATIONAL EMISSIONS
Table 6 identifies the localized operational impacts at the nearest receptor location in the vicinity of the Project. In an effort to establish a maximum potential impact scenario for analytical purposes, the emissions shown on Table 6 represent all on-site Project-related stationary (area) sources and on-site mobile source emissions. It should be noted that the longest on-site distance is roughly 0.16 miles for both trucks and passenger vehicles. As such, a separate CalEEMod run for operational LSTs has been prepared which accounts for the 0.16-mile on-site travel distance.
Outputs from the model runs for operational LSTs are provided in Attachment B. As shown in Table 6, emissions resulting from the Project operation will not exceed the numerical localized thresholds of significance established by the SCAQMD for any criteria pollutant. Thus, a less than significant impact would occur for localized Project-related operational-source emissions and no mitigation is required.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
TABLE 6: PROJECT LOCALIZED OPERATIONAL IMPACTS
On-Site Emissions
Emissions (lbs/day)
NOX CO PM10 PM2.5
Maximum Daily Emissions 0.20 0.98 0.02 0.01
SCAQMD Localized Threshold 371 1,965 15 4
Threshold Exceeded? NO NO NO NO
AIR QUALITY IMPACTS – CONSISTENCY WITH THRESHOLD NO. 1
Would the Project conflict with or obstruct implementation of the applicable air quality plan? The Project site is located within the SCAB, which is characterized by relatively poor air quality.
The SCAQMD has jurisdiction over an approximately 10,743 square -mile area consisting of the four-county Basin and the Los Angeles County and Riverside Coun ty portions of what use to be referred to as the Southeast Desert Air Basin. In these areas, the SCAQMD is principally responsible for air pollution control, and works directly with the Southern California Association of Governments (SCAG), county transportation commissions, local governments, as well as state and federal agencies to reduce emissions from stationary, mobile, and indirect sources to meet state and federal ambient air quality standards.
Currently, these state and federal air quality standards are exceeded in most parts of the SCAB.
In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy.
In December 2022, the SCAQMD released the Final 2022 AQMP (2022 AQMP). The 2022 AQMP continues to evaluate current integrated strategies and control measures to meet the CAAQS, as well as explore new and innovative methods to reach its goals. Some of these approaches include utilizing incentive programs, recognizing existing co -benefit programs from other sectors, and developing a strategy with fair-share reductions at the federal, state, and local levels (19). Similar to the 201 6 AQMP, the 2022 AQMP incorporates scientific and technological information and planning assumptions, including the 2020-2045 RTP/SCS, a planning document that supports the integration of land use and transportation to help the region meet the federal CAA requirements (20). The Project’s consistency with the AQMP will be determined using the 2022 AQMP as discussed below.
Criteria for determining consistency with the AQMP are defined in Chapter 12, Section 12.2 and Section 12.3 of the 1993 CEQA Handbook (21). These indicators are discussed below.
The proposed Project will not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP.
The violations that under this criterion refer to are the CAAQS and NAAQS. CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded. As evaluated, the Project’s regional and localized construction and operational-source emissions would not exceed applicable regional significance thresh olds. As such, a less than significant impact is expected.
On the basis of the preceding discussion, the Project is determined to be consistent with the first criterion.
The Project will not exceed the assumptions in the AQMP based on the years of Project build - out phase.
The 2022 AQMP demonstrates that the applicable ambient air quality standards can be achieved within the timeframes required under federal law. Growth projections from local general plans adopted by cities in the district are provided to the SCAG, which develops re gional growth forecasts, which are then used to develop future air quality forecasts for the AQMP. Development consistent with the growth projections in City of Lake Elsinore General Plan is considered to be consistent with the AQMP.
Peak day emissions generated by construction activities are largely independent of land use assignments, but rather are a function of development scope and maximum area of disturbance.
Irrespective of the site’s land use designation, development of the site to its maximum potential would likely occur, with disturbance of the entire site occurring during construction activities. As such, when considering that no emissions thresholds will be exceeded, a less than significant impact would result.
The City of Lake Elsinore General Plan designates the Project site as “ Historic District Business Professional” for APNs 377-232-006, -007, and -009. The “Historic District Business Professional” designation provides for office and administrative uses, light industrial, research and development, office-based firms, including office support facilities, restaurants, medical clinics, public and quasi-public uses, and similar compatible uses. This designation allows for a maximum FAR of 0.45 (22).
The zoning designation for the Project site is “M -1 Limited Manufacturing District,” which allows for light industrial uses that are relatively free of nuisance or hazardous characteristics and protect these areas from intrusion by residential, commercial, and other inharmonious uses.
The proposed Project includes the development of a concrete pumping truck storage yard, minor maintenance, and administrative office building of approximately 7,500 square feet on a currently vacant 1.5-acre site. As previously stated, the Project is consistent with the current land use and zoning designation. As such, the proposed Project would not conflict with the goals and objectives of the AQMP. Furthermore, the Project, as evaluated herein would not exceed the regional or localized air quality significance thresholds.
On the basis of the preceding discussion, the Project is determined to be consistent with the AQMP and a less than significant impact is expected.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
AIR QUALITY IMPACTS – CONSISTENCY WITH THRESHOLD NO. 2
Would the Project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard?
The CAAQS designate the Project site as nonattainment for O3, PM10, and PM2.5 while the NAAQS designates the Project site as nonattainment for O3 and PM2.5.
The SCAQMD has published a report on how to address cumulative impacts from air pollution:
White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution (23). In this report the SCAQMD clearly states (Page D-3):
“…the SCAQMD uses the same significance thresholds for project specific and cumulative impacts for all environmental topics analyzed in an Environmental Assessment or EIR. The only case where the significance thresholds for project specific and cumulative impacts differ is the Hazard Index (HI) significance threshold for TAC emissions. The project specific (project increment) significance threshold is HI > 1.0 while the cumulative (facility- wide) is HI > 3.0. It should be noted that the HI is only one of three TAC emission significance thresholds considered (when applicable) in a CEQA analysis. The other two are the maximum individual cancer risk (MICR) and the cancer burden, both of which use the same significance thresholds (MICR of 10 in 1 million and cancer burden of 0.5) for project specific and cumulative impacts.
Projects that exceed the project-specific significance thresholds are considered by the SCAQMD to be cumulatively considerable. This is the reason project-specific and cumulative significance thresholds are the same. Conversely, projects that do not exceed the project-specific thresholds are generally not considered to be cumulatively significant.” Therefore, this analysis assumes that individual projects that do not generate operational or construction emissions that exceed the SCAQMD’s recommended daily thresholds for project - specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants for which SCAB is in nonattainment, and, therefore, would not be considered to have a significant, adverse air quality impact. Alternatively, individual project-related construction and operational emissions that exceed SCAQMD thresholds for project -specific impacts would be considered cumulatively considerable.
Construction Impacts
The Project‐specific evaluation of emissions presented in the preceding analysis demonstrates that proposed Project construction -source air pollutant emissions would not result in exceedances of regional thresholds. Therefore, proposed Project construction-source emissions would be considered less than significant on a project-specific and cumulative basis.
Operational Impacts
The Project‐specific evaluation of emissions presented in the preceding analysis demonstrates that proposed Project operational-source air pollutant emissions would not result in exceedances of regional thresholds. Therefore, the proposed Project operational-source emissions would be considered less than significant on a project-specific and cumulative basis.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
AIR QUALITY IMPACTS – CONSISTENCY WITH THRESHOLD NO. 3
Would the expose sensitive receptors to substantial pollutant concentrations? The potential impact of Project-generated air pollutant emissions at sensitive receptors has also been considered. Results of the LST analysis indicate that the Project will not exceed the SCAQMD localized significance thresholds during construction. Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations during Project construction.
Additionally, the Project will not exceed the SCAQMD localized significance thresholds during operational activity. Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations as the result of Project operations.
CO “HOT SPOT” ANALYSIS
As discussed below, the Project would not result in potentially adverse CO concentrations or “hot spots.” An adverse CO concentration, known as a “hot spot”, would occur if an exceedance of the state one-hour standard of 20 ppm or the eight-hour standard of 9 ppm were to occur.
It has long been recognized that CO hotspots are caused by vehicular emissions, primarily when idling at congested intersections. In response, vehicle emissions standards have become increasingly stringent in the last twenty years. Currently, the allowable CO emissions standard in California is a maximum of 3.4 grams/mile for passenger cars (there are requirements for certain vehicles that are more stringent). With the turnover of older vehicles, introduction of cleaner fuels, and implementation of increasingly sophisticated and efficient emissions control technologies, CO concentration in the SCAB is now designated as attainment.
To establish a more accurate record of baseline CO concentrations affecting the SCAB, a CO “hot spot” analysis was conducted in 2003 for four busy intersections in Los Angeles at the peak morning and afternoon time periods
4. This “hot spot” analysis did not predict any exceedance of the 1-hour (20.0 ppm) or 8-hour (9.0 ppm) CO standards, as shown on Table 7.
TABLE 7: CO MODEL RESULTS
Intersection Location
CO Concentrations (ppm)
Morning 1-hour Afternoon 1-hour 8-hour
Wilshire Boulevard/Veteran Avenue 4.6 3.5 3.7
Sunset Boulevard/Highland Avenue 4 4.5 3.5
La Cienega Boulevard/Century Boulevard 3.7 3.1 5.2
Long Beach Boulevard/Imperial Highway 3 3.1 8.4
Notes: Federal 1-hour standard is 35 ppm and the deferral 8-hour standard is 9.0 ppm.
Based on the SCAQMD's 2003 AQMP and the 1992 Federal Attainment Plan for Carbon Monoxide (1992 CO Plan ), peak carbon monoxide concentrations in the SCAB were a result of unusual meteorological and topographical conditions and not a result of traffic volumes and congestion
4 The CO “hot spot” analysis conducted in 2003 is the most current study used for CO “hot spot” analysis in the SCAB.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
at a particular intersection. As evidence of this, for example, of the 8.4 ppm 8-hr CO concentration measured at the Long Beach Blvd. and Imperial Hwy. intersection (i.e., the highest CO generating intersection within the “hot spot” analysis), only 0.7 ppm was attributable to the traffic volumes and congestion at this intersection; the remaining 7.7 ppm were due to the ambient air measurements at the time the 2003 AQMP was prepared (24) . In contrast, an adverse CO concentration, known as a “hot spot”, would occur if an exceedance of the state one -hour standard of 20 parts per million (ppm) or the eight-hour standard of 9 ppm were to occur.
The ambient 1-hr and 8-hr CO concentration within the Project study area is estimated to be 0.9 ppm and 0.6 ppm, respectively (data from Lake Elsinore Area monitoring station for 202 2).
Therefore, even if the traffic volumes for the proposed Project were ten times the traffic volumes generated at the Long Beach Blvd. and Imperial Hwy. intersection, due to the on -going improvements in ambient air quality and vehicular emissions controls, the Project would not be capable of resulting in a CO “hot spot” at any study area intersections. As noted above, only 0.7 ppm were attributable to the traffic volumes and congestion at one of the busiest intersec tions in the SCAB. Therefore, if these traffic volumes were multiplied by ten times, it could be expected that the CO attributable to traffic would increase tenfold as well, resulting in 7 ppm – even if this were added to either the 1-hour or 8-hour CO concentrations within the Project study area, this would result in 7.9 ppm and 7.6 ppm for the 1 -hr and 8-hr timeframes, respectively. Neither of which would exceed the applicable 1-hr standard of 20 ppm or the 8-hr standard of 9 ppm.
Similar considerations are also employed by other Air Districts when evaluating potential CO concentration impacts. More specifically, the Bay Area Air Quality Management District (BAAQMD) concludes that under existing and future vehicle emission rates, a given project would have to increase traffic volumes at a single intersection by more than 44,000 vehicles per hour (vph)—or 24,000 vph where vertical and/or horizontal air does not mix —in order to generate a significant CO impact (25). Traffic volumes generating the CO concentrations for the “hot spot” analysis is shown on Table 8. The busiest intersection evaluated was that at Wilshire Boulevard and Veteran Avenue, which had AM/PM traffic volumes of 8,062 vph and 7,719 vph respectively (24)
.
TABLE 8: CO MODEL RESULTS
Intersection Location
Peak Traffic Volumes (vph)
Eastbound
(AM/PM)
Westbound
(AM/PM)
Southbound
(AM/PM)
Northbound
(AM/PM)
Total
(AM/PM)
Wilshire Boulevard/Veteran Avenue 4,954/2,069 1,830/3,317 721/1,400 560/933 8,062/7,719 Sunset Boulevard/Highland Avenue 1,417/1,764 1,342/1,540 2,304/1,832 1,551/2,238 6,614/5,374 La Cienega Boulevard/Century Boulevard 2,540/2,243 1,890/2,728 1,384/2,029 821/1,674 6,634/8,674 Long Beach Boulevard/Imperial Highway 1,217/2,020 1,760/1,400 479/944 756/1,150 4,212/5,514 Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
AIR QUALITY IMPACTS – CONSISTENCY WITH THRESHOLD NO. 4
Would the Project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
The potential for the Project to generate objectionable odors has also been considered. Land uses generally associated with odor complaints include:
• Agricultural uses (livestock and farming)
• Wastewater treatment plants
• Food processing plants
• Chemical plants
• Composting operations
• Refineries
• Landfills
• Dairies
• Fiberglass molding facilities
The Project does not contain land uses typically associated with emitting objectionable odors.
Potential odor sources associated with the proposed Project may result from construction equipment exhaust and the application of asphalt and architectural coatings during construction activities and the temporary storage of typical solid waste (refuse) associated with the proposed Project’s (long-term operational) uses. Standard construction requirements would minimize odor impacts from construction. The construction odor emissions would be temporary, short -term, and intermittent in nature and would cease upon completion of the respective phase of construction and is thus considered less than significant. It is expected that Project -generated refuse would be stor ed in covered containers and removed at regular intervals in compliance with the solid waste regulations. The proposed Project would also be required to comply with SCAQMD Rule 402 to prevent occurrences of public nuisances. Therefore, odors associated with the proposed Project construction and operations would be less than significant and no mitigation is required (26).
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
PROJECT GHG ANALYSIS
CLIMATE CHANGE SETTING
Global climate change (GCC) is the change in average meteorological conditions on the earth with respect to temperature, precipitation, and storms. The majority of scientists believe that the climate shift taking place since the Industrial Revolution is occurring at a quicker rate and magnitude than in the past. Scientific evidence suggests that GCC is the result of increased concentrations of GHGs in the earth’s atmosphere, including carbon di oxide (CO 2), methane
(CH4), nitrous oxide (N 2O), and fluorinated gases. The majority of scientists believe that this increased rate of climate change is the result of GHGs resulting from human activity and industrialization over the past 200 years.
An individual project like the proposed Project evaluated in this memo cannot generate enough GHG emissions to affect a discernible change in global climate. However, the proposed Project may participate in the potential for GCC by its incremental contribution of GHGs combined with the cumulative increase of all other sources of GHGs, which when taken together constitute potential influences on GCC. Because these changes may have serious environmental consequences, this memo will evaluate the potential for the proposed Project to have a significant effect upon the environment as a result of its potential contribution to the greenhouse effect.
GCC refers to the change in average meteorological conditions on the earth with respect to temperature, wind patterns, precipitation and storms. Global temperatures are regulated by naturally occurring atmospheric gases such as water vapor, CO 2, N2O, CH4, hydrofluorocarbons
(HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF 6). These particular gases are important due to their residence time (duration they stay) in the atmosphere, which ranges from 10 years to more than 100 years. These gases allow solar radiation into the earth’s atmosphere, but prevent radiative heat from escaping, thus warming the earth’s atmosphere. GCC can occur naturally as it has in the past with the previous ice ages.
Gases that trap heat in the atmosphere are often referred to as GHGs. GHGs are released into the atmosphere by both natural and anthropogenic activity. Without the natural GHG effect, the earth’s average temperature would be approximately 61 degrees Fahrenheit (°F) cooler than it is currently. The cumulative accumulation of these gases in the earth’s atmosphere is considered to be the cause for the observed increase in the earth’s temperature.
For the purposes of this analysis, emissions of CO
2, CH4, and N2O were evaluated because these
gases are the primary contributors to GCC from development projects. Although there are other substances such as fluorinated gases that also contribute to GCC, these fluorinated gases were not evaluated as their sources are not well-defined and do not contain accepted emissions factors or methodology to accurately calculate these gases.
REGULATORY SETTING
Executive Order S-3-05
Former California Governor Arnold Schwarzenegger announced on June 1, 2005, through Executive Order S-3-05, the following reduction targets for GHG emissions:
• By 2010, reduce GHG emissions to 2000 levels.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
• By 2020, reduce GHG emissions to 1990 levels.
• By 2050, reduce GHG emissions to 80% below 1990 levels.
The 2050 reduction goal represents what some scientists believe is necessary to reach levels that will stabilize the climate. The 2020 goal was established to be a mid-term target. Because this is an executive order, the goals are not legally enforceable for local governments or the private sector.
Assembly Bill (AB) 32
The California State Legislature enacted AB 32, which requires that GHGs emitted in California be reduced to 1990 levels by the year 2020. “GHGs” as defined under AB 32 include CO 2, CH4, N2O,
hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). Since AB 32 was enacted, a seventh chemical, nitrogen trifluoride, has also been added to the list of GHGs.
CARB is the state agency charged with monitoring and regulating sources of GHGs. Pursuant to AB 32, CARB adopted regulations to achieve the maximum technologically feasible and cost - effective GHG emission reductions. AB 32 states the following:
“Global warming poses a serious threat to the economic well -being, public health, natural resources, and the environment of California. The potential adverse impacts of global warming include the exacerbation of air quality problems, a reduction in the quality and supply of water to the state from the Sierra snowpack, a rise in sea levels resulting in the displacement of thousands of coastal businesses and residences, damage to marine ecosystems and the natural environment, and an increase in the incidences of infectious diseases, asthma, and other human health-related problems.”
CARB approved the 1990 GHG emissions level of 427 million metric ton of CO 2 equivalent per
year (MMTCO2e) on December 6, 2007 (27). Therefore, emissions generated in California in 2020 are required to be equal to or less than 427 MMTCO2e. Emissions in 2020 in a “business as usual” (BAU) scenario were estimated to be 596 MMTCO 2e, which do not account for reductions from AB 32 regulations (28). At that level, a 28.4% reduction was required to achieve the 427 MMTCO2e 1990 inventory. In October 2010, CARB prepared an updated BAU 2020 forecast to account for the recession and slower forecasted growth. The forecasted inventory without the benefits of adopted regulation is now estimated at 545 MMTCO
2e. Therefore, under the updated forecast, a
21.7% reduction from BAU is required to achieve 1990 levels (29).
Progress in Achieving AB 32 Targets and Remaining Reductions Required The State has made steady progress in implementing AB 32 and achieving targets included in Executive Order S -3-05. The progress is shown in updated emission inventories prepared by CARB for 2000 through 2012 (30). The State has achieved the Executive Order S- 3-05 target for 2010 of reducing GHG emissions to 2000 levels. As shown below, the 2010 emission inventory achieved this target.
• 1990: 427 MMTCO
2e (AB 32 2020 target)
• 2000: 463 MMTCO2e (an average 8% reduction needed to achieve 1990 base) • 2010: 450 MMTCO2e (an average 5% reduction needed to achieve 1990 base) Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CARB has also made substantial progress in achieving its goal of achieving 1990 emissions levels by 2020. As described earlier in this section, CARB revised the 2020 BAU inventory forecast to account for new lower growth projections, which resulted in a new lower reduction from BAU to achieve the 1990 base. The previous reduction from 2020 BAU needed to achieve 1990 levels was 28.4% and the latest reduction from 2020 BAU is 21.7%. • 2020: 545 MMTCO
2e BAU (an average 21.7% reduction from BAU needed to achieve 1990 base)
Senate Bill (SB) 32
On September 8, 2016, Governor Jerry Brown signed the SB 32 and its companion bill, AB 197. SB 32 requires the state to reduce statewide GHG emissions to 40% below 1990 levels by 2030, a reduction target that was first introduced in Executive Order B-30-15. The new legislation builds upon the AB 32 goal of 1990 levels by 2020 and provides an intermediate goal to achieving S -3- 05, which sets a statewide GHG reduction target of 80% below 1990 levels by 2050. AB 197 creates a legislative committee to oversee r egulators to ensure that CARB not only responds to the Governor, but also the Legislature (31).
AB 197
A condition of approval for SB 32 was the passage of AB 197. AB 197 requires that CARB consider the social costs of GHG emissions and prioritize direct reductions in GHG emissions at mobile sources and large stationary sources. AB 197 also gives the California legislature more oversight over CARB through the addition of two legislatively appointed members to the CARB Board and the establishment a legislative committee to make recommendations about CARB programs to the legislature.
Executive Order B-55-18 and SB 100
Executive Order B -55-18 and SB 100. SB 100 and Executive Order B -55-18 were signed by Governor Brown on September 10, 2018. Under the existing RPS, 25% of retail sales are required to be from renewable sources by December 31, 2016, 33% by December 31, 2020 , 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. SB 100 raises California’s RPS requirement to 50% renewable resources target by December 31, 2026, and to achieve a 60% target by December 31, 2030. SB 100 also requires th at retail sellers and local publicly owned electric utilities procure a minimum quantity of electricity products from eligible renewable energy resources so that the total kilowatt hours of those products sold to their retail end-use customers achieve 44% of retail sales by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. In addition to targets under AB 32 and SB 32, Executive Order B- 55-18 establishes a carbon neutrality goal for the state of California by 2045; and sets a goal to maintain net negative emissions thereafter. The Executive Order directs the California Natural Resources Agency (CNRA), California Environmental Protection Agency (CalEPA), the Department of Food and Agriculture (CDFA), and CARB to include sequestration t argets in the Natural and Working Lands Climate Change Implementation Plan consistent with the carbon neutrality goal.
Title 24 California Code of Regulations (CCR)
California Code of Regulations (CCR) Title 24 Part 6: The California Energy Code was first adopted in 1978 in response to a legislative mandate to reduce California’s energy consumption.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. CCR, Title 24, Part 11: California Green Building Standards Code (CALGreen) is a comprehensive and uniform regulatory code for all residential, industrial, commercial, and school buildings that went in effect on August 1, 2009, and is administered by the California Building Standards Commission.
CALGreen is updated on a regular basis, with the most recent approved update consisting of the 2022 California Green Building Code Standards that was effective on January 1, 20235. As construction of the Project is anticipated to be completed in 2024, the Project would be required to comply with the Title 24 standards in place at that time.
SCAQMD
SCAQMD is the agency responsible for air quality planning and regulation in the SCAB. The SCAQMD addresses the impacts to climate change of projects subject to SCAQMD permit as a lead agency if they are the only agency having discretionary approval for the project and acts as a responsible agency when a land use agency must also approve discretionary permits for the project. The SCAQMD acts as an expert commenting agency for impacts to air quality. This expertise carries over to GHG emissions, so the agency helps local land use agencies through the development of models and emission thresholds that can be used to address GHG emissions.
In 2008, SCAQMD formed a Working Group to identify GHG emissions thresholds for land use projects that could be used by local lead agencies in the SCAB. The Working Group developed several different options that are contained in the SCAQMD Draft Guidance Document – Interim CEQA GHG Significance Threshold, that could be applied by lead agencies. The working group has not provided additional guidance since release of the interim guidance in 2008. The SCAQMD Board has not approved the thresholds; however, the Guidance Document provides substantial evidence supporting the approaches to significance of GHG emissions that can be considered by the lead agency in adopting its own threshold. The current interim thresholds consist of the following tiered approach:
• Tier 1 consists of evaluating whether or not the project qualifies for any applicable exemption under CEQA.
• Tier 2 consists of determining whether the project is consistent with a GHG reduction plan. If a project is consistent with a qualifying local GHG reduction plan, it does not have significant GHG emissions.
• Tier 3 consists of screening values, which the lead agency can choose, but must be consistent with all projects within its jurisdiction. A project’s construction emissions are averaged over 30 years and are added to the project’s operational emissions. If a project’s emissions are below one of the following screening thresholds, then the project is less than significant:
o Residential and commercial land use: 3,000 m etric ton of CO 2 equivalent
(MTCO2e/yr)
5 The 2022 California Green Building Standard Code will be published July 1, 2022.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
o Industrial land use: 10,000 MTCO2e/yr
o Based on land use type: residential: 3,500 MTCO 2e/yr; commercial: 1,400 MTCO2e/yr; or mixed use: 3,000 MTCO2e/yr
• Tier 4 has the following options:
o Option 1: Reduce Business-as-Usual (BAU) emissions by a certain percentage; this percentage is currently undefined.
o Option 2: Early implementation of applicable AB 32 Scoping Plan measures o Option 3: 2020 target for service populations (SP), which includes residents and employees: 4.8 MTCO2e per SP per year for projects and 6.6 MTCO 2e per SP per year for plans;
o Option 3, 2035 target: 3.0 MTCO 2e per SP per year for projects and 4.1 MTCO 2e per SP per year for plans
• Tier 5 involves mitigation offsets to achieve target significance threshold.
The SCAQMD’s interim thresholds used the Executive Order S- 3-05-year 2050 goal as the basis for the Tier 3 screening level. Achieving the Executive Order’s objective would contribute to worldwide efforts to cap CO
2 concentrations at 450 ppm, thus stabilizing global climate.
SCAQMD only has authority over GHG emissions from development projects that include air quality permits. At this time, it is unknown if the project would include stationary sources of emissions subject to SCAQMD permits. Notwithstanding, if the Project requires a stationary permit, it would be subject to the applicable SCAQMD regulations.
SCAQMD Regulation XXVII, adopted in 2009 includes the following rules:
• Rule 2700 defines terms and post global warming potentials. • Rule 2701, Southern California (SoCal) Climate Solutions Exchange, establishes a voluntary program to encourage, quantify, and certify voluntary, high quality certified GHG emission reductions in the SCAQMD.
• Rule 2702, GHG Reduction Program created a program to produce GHG emission reductions within the SCAQMD. The SCAQMD will fund projects through contracts in response to requests for proposals or purchase reductions from other parties.
SCAQMD is the agency responsible for air quality planning and regulation in the SCAB. The SCAQMD addresses the impacts to climate change of projects subject to SCAQMD permit as a lead agency if they are the only agency having discretionary approval for the project and acts as a responsible agency when a land use agency must also approve discretionary permits for the project. The SCAQMD acts as an expert commenting agency for impacts to air quality. This expertise carries over to GHG emissions, so the agency helps local land use agencies through the development of models and emission thresholds that can be used to address GHG emissions.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CITY OF LAKE ELSINORE CLIMATE ACTION PLAN (CAP)
The City of Lake Elsinore CAP is a comprehensive document to ensure that the City reduces community-wide GHG emissions (32). The CAP was prepared concurrently with the City’s General Plan and environmental impact report (EIR), to serve as the City’s primary information and policy document for GHG emissions reductions in order to analyze and reduce potentially significant GHG emissions resulting from development under the City of Lake Elsinore General Plan.
The CAP includes a “Project-Level CAP Consistency Worksheet” to determine if further analysis is required. It should be noted that the “Project -Level CAP Consistency Worksheet” is generally applicable to traditional land use development projects . As such, pursuant to the CAP documentation, consistency with the CAP is evaluated on Table 10.
GHG IMPACTS
Standards of Significance
According to the CEQA Guidelines Appendix G thresholds, to determine whether impacts from GHG emissions are significant. Would the project:
• Threshold 1 : Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment?
• Threshold 2 : Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of GHGs?
The evaluation of an impact under CEQA requires measuring data from a project against both existing conditions and a “threshold of significance.” For establishing significance thresholds, the Office of Planning and Research’s amendments to the CEQA Guidel ines Section 15064.7(c) state “[w]hen adopting thresholds of significance, a lead agency may consider thresholds of significance previously adopted or recommended by other public agencies, or recommended by experts, provided the decision of the lead agency to adopt such thresholds is supported by substantial evidence.”
CEQA Guidelines Section 15064.4(a) further states, “. . . A lead agency shall have discretion to determine, in the context of a particular project, whether to: (1) Use a model or methodology to quantify greenhouse gas emissions resulting from a project, and which model or methodo logy to use . . .; or (2) Rely on a qualitative analysis or performance-based standards.” CEQA Guidelines Section 15064.4 provides that a lead agency should consider the following factors, among others, in assessing the significance of impacts from greenhouse gas emissions:
• Consideration #1: The extent to which the project may increase or reduce greenhouse gas emissions as compared to the existing environmental setting.
• Consideration #2: Whether the project emissions exceed a threshold of significance that the lead agency determines applies to the project.
• Consideration #3: The extent to which the project complies with regulations or requirements adopted to implement a statewide, regional, or local plan for the reduction or mitigation of greenhouse gas emissions. Such regulations or requirements must be Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
adopted by the relevant public agency through a public review process and must reduce or mitigate the project’s incremental contribution of greenhouse gas emissions. In determining the significance of impacts, the lead agency may consider a project’s consistency with the State’s long-term climate goals or strategies, provided that substantial evidence supports the agency’s analysis of how those goals or strategies address the project’s incremental contribution to climate change and its conclusion that the project’s incremental contribution is not cumulatively considerable.
Discussion on Establishment of Significance Thresholds
The City of Lake Elsinore has not adopted its own numeric threshold of significance for determining impacts with respect to project level GHG emissions. However, an acceptable approach, for small projects, is using a screening threshold of 3,000 MT CO2e/yr to determine if additional analysis is required. This approach is an accepted screening method used by the City of Lake Elsinore and numerous local agencies throughout South Coast Air Basin and is based on the SCAQMD staff’s proposed GHG screening threshold for stationary source emissions for non- industrial projects, as described in the SCAQMD’s Interim CEQA GHG Significance Threshold for Stationary Sources, Rules and Plans (“SCAQMD Interim GHG Threshold”). The SCAQMD Interim GHG Threshold identifies a screening threshold to determine whether additional analysis is required (33). As noted by the SCAQMD:
“…the…screening level for stationary sources is based on an emission capture rate of 90% for all new or modified projects...the policy objective of [SCAQMD’s] recommended interim GHG significance threshold proposal is to achieve an emission capture rate of 90% of all new or modified stationary source projects. A GHG significance threshold based on a 90% emission capture rate may be more appropriate to address the long-term adverse impacts associated with global climate change because most projects will be required to implement GHG reduction measures. Further, a 90% emission capture rate sets the emission threshold low enough to capture a substantial fraction of future stationary source projects that will be constructed to accommodate future statewide population and economic growth, while setting the emission threshold high enough to exclude small projects that will in aggregate contribute a relatively small fraction of the cumulative statewide GHG emissions. This assertion is based on the fact that [SCAQMD] staff estimates that these GHG emissions would account for slightly less than 1% of future 2050 statewide GHG emissions target (85 [MMT CO
2e/yr]). In addition, these small projects may be subject to future applicable GHG control regulations that would further reduce their overall future contribution to the statewide GHG inventory. Finally, these small sources are already subject to [Best Available Control Technology] (BACT) for criteria pollutants and are more likely to be single-permit facilities, so they are more likely to have few opportunities readily available to reduce GHG emissions from other parts of their facility.” (34)
Thus, and based on guidance from the SCAQMD, if a n industrial project would emit GHGs less than 3,000 MT CO
2e per year, the project is not considered a substantial GHG emitter and the GHG impact is less than significant, requiring no additional analysis and no mitigation. On the other hand, if an industrial project would emit GHGs in excess of 3,000 MT CO 2e/yr, then the project could be considered a substantial GHG emitter, which would require additional analysis and potentially mitigation.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
GHG IMPACTS – CONSISTENCY WITH THRESHOLD NO. 1
Would the Project have the potential to generate direct or indirect GHG emissions that would result in a significant impact on the environment?
PROJECT GHG EMISSIONS
The estimated GHG emissions for the Project land use are summarized on Table 9. The estimated GHG emission include emissions from Carbon Dioxide (CO2), Methane (CH4), Nitrous Oxide (N2O), and Refrigerants (R). As shown on Table 9, the Project would generate a total of approximately 246.65 MTCO2e/yr. Detailed operation model outputs for the proposed Project are presented in Attachment A.
TABLE 9: TOTAL PROJECT GHG EMISSIONS
Source
Emission (lbs/day)
CO2 CH4 N2O R Total CO2e
Annual construction-related emissions
amortized over 30 years 6.48 2.54E-04 1.21E-04 6.40E-04 6.52 Mobile 187.83 0.01 0.02 0.25 193.74
Area 0.15 6.38E-06 1.31E-06 0.00 0.15
Energy 40.60 3.78E-03 3.61E-04 0.00 40.80
Water 1.86 0.04 1.05E-03 0.00 3.26
Waste 0.62 0.06 0.00 0.00 2.18
Refrigerants 0.00 0.00 0.00 2.05E-03 2.05E-03
Total CO2e (All Sources) 246.65
As discussed previously, the City of Lake Elsinore has not adopted its own numeric threshold of significance for determining impacts with respect to GHG emissions. A screening threshold of 3,000 MTCO2e/yr to determine if additional analysis is required is an acceptable approach for small projects. This ap proach is a widely accepted screening threshold used by the County of Riverside (35) and numerous cities in the SCAQMD staff’s proposed GHG screening threshold for stationary source emissions for non -industrial projects, as described in the SCAQMD’s Interim CEQA GHG Significance Threshold for Stationary Sources, Rules and Plans (“SCAQMD Interim GHG Threshold”). The SCAQMD Interim GHG Threshold identifies a screening threshold to determine whether additional analysis is required (34) projects that generate less than 3,000 MTCO 2e/yr would have a less-than-significant GHG emissions impact.
As shown, the proposed Project would generate a total of 246.65 MTCO2e/yr and would therefore not exceed the 3,000 MTCO2e/yr significance threshold. Thus, the Project would result in a less than significant impact with respect to GHG emissions.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
GHG IMPACTS – CONSISTENCY WITH THRESHOLD NO. 2
Would the Project have the potential to conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of GHGs? Pursuant to 15604.4 of the CEQA Guidelines, a lead agency may rely on qualitative analysis or performance-based standards to determine the significance of impacts from GHG emissions (36).
The 2022 Scoping Plan for Achieving Carbon Neutrality (2022 Scoping Plan) lays out a path to achieve targets for carbon neutrality and reduce anthropogenic greenhouse gas (GHG) emissions by 85 percent below 1990 levels no later than 2045, as directed by Assembly Bill 1279. The actions and outcomes in the plan will achieve significant reductions in fossil fuel combustion by deploying clean technologies and fuels, further reductions in short -lived climate pollutants, support for sustainable development, increased action on natural and working lands to reduce emissions and sequester carbon, and the capture and storage of carbon (37).
Additionally, the Project will result in approximately 246.65 MTCO 2e/yr and would not exceed the
screening threshold of 3,000 MTCO 2e/yr. Thus, Project -related emissions would not have a significant direct or indirect impact on GHG and climate change and would comply with the City’s GHG policies under the CAP without mitigation as shown on Table 10. Overall, the proposed Project would not conflict with the City’s CAP and impacts would be less than significant.
Finally, the Project is consistent with the general plan land use designation, density, building intensity, and applicable policies specified for the Project area in SCAG's Sustainable Community Strategy/ Regional Transportation Plan, which pursuant to SB 375 calls for the integration of transportation, land -use and housing policies to plan for achievement of the GHG -emissions target for the region. Thus, a less than significant impact related to GHG emissions from Project construction and operation would occur and no mitigation is required.
CONSISTENCY WITH CITY OF LAKE ELSINORE CAP
The City’s CAP, adopted in 2011, certified that the City’s target is consistent with AB 32’s 2020 goals. Although the Project will be completed post -2020, at the time this analysis was prepared, an updated CA P has not been formally adopted. The following table consists of an analysis of Project consistency with the policies in the CAP.
TABLE 10: PROJECT CONSISTENCY WITH CITY OF LAKE ELSINORE CAP CAP Measure Applicability to Proposed Project Remarks
Measure T-1.2:
Pedestrian
Infrastructure
Applicable
This measure requires the
installation of sidewalks along new
and reconstructed streets and
sidewalks or paths to internally link
all uses and provide connections to
neighborhood activity centers, major
destinations, and transit facilities
contiguous with the project site. This
measure is implemented by the
Department of Public Works and
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CAP Measure Applicability to Proposed Project Remarks
Building Department through policy
development, development review,
and conditions of approval. The
proposed Project elements would be
required to comply with conditions
of approval imposed by the City. As
such, the proposed Project would
not conflict with this measure.
Measure T-1.4: Bicycle
Infrastructure Applicable
This measure requires new
development to implement and
connect to the network of Class I, II
and III bikeways, trails and safety
features identified in the General
Plan, Bike Lane Master Plan, Trails
Master Plan and Western Riverside
County Non- Motorized
Transportation plan. This measure is
implemented by the Department of
Public Works, Community Services
Department, and Building
Department through policy
development, development review,
and conditions of approval. The
proposed Project elements would be
required to comply with conditions
of approval imposed by the City. As
such, the proposed Project would
not conflict with this measure.
Measure T-1.5: Bicycle
Parking Standards Applicable
This measure requires the City to
enforce short-term and long-term
bicycle parking standards for new
non- residential developments. This
measure is implemented by the
Department of Public Works and
Building Department through
development review and conditions
of approval. The proposed Project
elements would be required to
comply with conditions of approval
imposed by the City. As such, the
proposed Project would not conflict
with this measure.
Measure T-2.1:
Designated Parking for
Fuel Efficient Vehicles
Applicable
This measure requires new non-
residential developments to
designate 10% of total parking
spaces for low-emitting, fuel-efficient
vehicles. This measure is
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CAP Measure Applicability to Proposed Project Remarks
implemented by the Department of
Planning, Public Works and Building
through development review and
conditions of approval. The
proposed Project elements would be
required to comply with conditions
of approval imposed by the City. As
such, the proposed Project would
not conflict with this measure.
Measure T-4.1:
Commute Trip
Reduction Program
Applicable
This measure requires the City to
institute a commute trip reduction
program for employers with fewer
than 100 employees. This measure
is implemented by the Department
of Planning through amendment to
the Municipal Code. The proposed
Project elements would be required
to comply with the City’s Municipal
Code. As such, the proposed Project
would not conflict with this measure.
Measure E-1.1: Tree
Planting Requirements Applicable
This measure requires new
developments to plant at minimum
one 15-gallon non-deciduous,
umbrella-form tree per 30 linear feet
of boundary length near buildings.
This measure is implemented by the
Departments of Planning, Public
Works, and Parks and Recreation
through City ordinance,
development review process, and
conditions of approval. The
proposed Project elements would be
required to comply with the City
ordinances and conditions of
approval. As such, the proposed
Project would not conflict with this
measure.
Measure E-1.2: Cool
Roof Requirements Applicable
This measure requires new non-
residential development to use
roofing materials having solar
reflectance, thermal emittance, or
Solar Reflectance Index consistent
with CALGreen Tier 1 values. This
measure is implemented by the
Departments of Planning and
Building through City ordinance,
development review process, and
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CAP Measure Applicability to Proposed Project Remarks
conditions of approval. The
proposed Project elements would be
required to comply with the City
ordinances and conditions of
approval. As such, the proposed
Project would not conflict with this
measure.
Measure E-1.3: Energy
Efficient Building
Standards
Applicable
This measure requires that new
construction exceed the California
Energy Code requirements through
either the performance-based or
prescriptive approach described in
the California Green Building Code.
This measure is implemented by the
Departments of Planning, Public
Works, and Building through City
ordinance, development review
process, and conditions of approval.
The proposed Project elements
would be required to comply with
the City ordinances and conditions
of approval. As such, the proposed
Project would not conflict with this
measure.
Measure E-3.2: Energy
Efficient Street and
Traffic Signal Lights
Applicable
This measure requires the City to
work with Southern California
Edison to replace existing high-
pressure sodium streetlights and
traffic lights with high efficiency
alternatives, such as Low Emitting
Diode (LED) lights; replace existing
City owned traffic lights with LED
lights; require any new street and
traffic lights to be LED. This measure
is currently being implemented by
the Department of Public Works
through renovation. The Planning
Department obtains compliance
through Municipal Code
amendment, the development and
review process, and conditions of
approval.
This measure would apply to any
traffic lights replaced or installed as
part of the Project. The proposed
Project elements would be required
to comply with the municipal code
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CAP Measure Applicability to Proposed Project Remarks
and conditions of approval. As such,
the proposed Project would not
conflict with this measure. Measure E-4.1:
Landscaping Ordinance Applicable
This measure requires the City to
enforce the City’s AB 1881
Landscaping Ordinance, which
requires that landscaping be water
efficient, thereby consuming less
energy and reducing emissions. This
measure is implemented by the
Departments of Building and
Planning through City ordinance,
development and review process,
and conditions of approval. The
proposed Project elements would be
required to comply with these
landscape requirements. As such,
the proposed Project would not
conflict with this measure.
Measure E-4.2: Indoor
Water Conservation
Requirements
Applicable
This measure requires that
development projects reduce indoor
water consumption. This measure is
implemented by the Departments of
Building and Planning through
amendments to the Municipal Code
and conditions of approval. The
proposed Project elements would be
required to comply with the City’s
Municipal Code and conditions of
approval. As such, the proposed
Project would not conflict with this
measure.
Measure E-5.1:
Renewable Energy
Incentives
Applicable
This measure facilitates the
voluntary installation of small-scale
renewable energy systems, such as
solar photovoltaic and solar hot
water systems, by connecting
residents and businesses with
technical and financial assistance
through the City website. This
measure is implemented by the
Departments of Building and
Planning through outreach and
incentive programs. No elements of
the proposed Project would conflict
with this measure.
Alan Fleming, AF Properties, LLC
July 22, 2024
15715-03 AQ & GHG Assessment
CAP Measure Applicability to Proposed Project Remarks
Measure S-1.4:
Construction and
Demolition Waste
Diversion
Applicable
This measure requires development
projects to divert, recycle or salvage
nonhazardous construction and
demolition debris generated at the
site, and requires all construction
and demolition projects to be
accompanied by a waste
management plan for the project.
This measure is implemented by the
Departments of Planning and
Building through City contracts,
Municipal Code amendments,
development and review process,
and conditions of approval. The
proposed Project project-specific
elements would be required to
comply with the City’s Municipal
Code and conditions of approval. As
such, the proposed Project would
not conflict with this measure.
CONCLUSION
Results of the assessment indicate that the Project is not anticipated to result in a significant impact during construction or operational activities associated with air quality and greenhouse gases and no mitigation is required.
15715-03 AQ & GHG Assessment
REFERENCES
1. South Coast Air Quality Management District. Southern California Air Basins. [Online] https://www.arb.ca.gov/msprog/onroad/porttruck/maps/scabc7map.pdf.
2. Ralph Propper, Patrick Wong, Son Bui, Jeff Austin, William Vance, Alvaro Alvarado, Bart Croes, and Dongmin Luo. Ambient and Emission Trends of Toxic Air Contaminants in California. American Chemical Society: Environmental Science & Technology. 2015.
3. United States Environmental Protection Agency. National Ambient Air Quality Standards (NAAQS). [Online] 1990. https://www.epa.gov/environmental-topics/air-topics.
4. Environmental Protection Agency. Air Pollution and the Clean Air Act. [Online] http://www.epa.gov/air/caa/.
5. 1990 Clean Air Act Amendment Summary: Title I. [Online] https://www.epa.gov/clean- air-act-overview/1990-clean-air-act-amendment-summary-title-i.
6. United States Environmental Protection Agency. 1990 Clean Air Act Amendment Summary: Title II. [Online] https://www.epa.gov/clean -air-act-overview/1990- clean-air-act-amendment-summary-title-ii.
7. Air Resources Board. California Ambient Air Quality Standards (CAAQS). [Online] 2009. [Cited: April 16, 2018.] http://www.arb.ca.gov/research/aaqs/caaqs/caaqs.htm.
8. Environmental Protection Agency. National Ambient Air Quality Standards (NAAQS). [Online] 1990. https://www.epa.gov/environmental-topics/air-topics.
9. Southern California Association of Governments. 2016- 2040 Regional Transportation Plan/Sustainable Communities Strategy. [Online] April 2016. http://scagrtpscs.net/Documents/2016/final/f2016RTPSCS.pdf.
10. South Coast Air Quality Management District. RULE 403. FUGITIVE DUST. [Online] https://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule- 403.pdf?sfvrsn=4.
11. —. RULE 1113. Architectural Coatings. [Online] http://www.aqmd.gov/docs/default - source/rule-book/reg-xi/r1113.pdf.
12. California Air Pollution Control Officers Association (CAPCOA). California Emissions Estimator Model (CalEEMod). [Online] May 2022. www.caleemod.com.
13. State of California. 2020 CEQA California Environmental Quality Act. 2020.
14. South Coast Air Quality Management District (SCAQMD). SCAQMD Air Quality Significance Thresholds. [Online] https://www.aqmd.gov/docs/default - source/ceqa/handbook/south-coast-aqmd-air-quality-significance- thresholds.pdf.
15. California Air Pollution Control Officers Association (CAPCOA). Appendix A: Calculation Details for CalEEMod. CalEEMod. [Online] http://www.aqmd.gov/docs/default - source/caleemod/02_appendix-a2016-3-2.pdf?sfvrsn=6.
16. State of California. 2020 CEQA California Environmental Quality Act. 2020.
15715-03 AQ & GHG Assessment
17. Urban Crossroads, Inc. Fleming & Sons Concrete Pumping, Inc. Truck Yard Trip Generation Assessment . 2023.
18. South Coast Air Quality Management District. Localized Significance Thresholds Methodology. s.l. : South Coast Air Quality Managment District, 2003.
19. —. Final 2016 Air Quality Management Plan (AQMP). [Online] March 2017. http://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality- management-plans/2016-air-quality-management-plan/final-2016- aqmp/final2016aqmp.pdf?sfvrsn=11.
20. Southern California Association of Governments. 2020- 2045 Regional Transportation Plan/Sustainable Communities Strategy. [Online] September 2020. https://scag.ca.gov/sites/main/files/file-attachments/0903fconnectsocal- plan_0.pdf?1606001176.
21. South Coast Air Quality Management District. CEQA Air Quality Handbook (1993). 1993.
22. City of Lake Elsinore. Downtown Elsinore Specific Plan. [Online] 2018. https://www.lake- elsinore.org/DocumentCenter/View/2369/Downtown-Elsinore-Specific-Plan- PDF?bidId=.
23. Goss, Tracy A and Kroeger, Amy. White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution. [Online] South Coast Air Quality Management District, 2003.
http://www.aqmd.gov/rules/ciwg/final_white_paper.pdf.
24. South Coast Air Quality Management District. 2003 Air Quality Management Plan. [Online] 2003. https://www.aqmd.gov/home/air -quality/clean-air-plans/air- quality-mgt-plan/2003-aqmp.
25. Bay Area Air Quality Management District. [Online] http://www.baaqmd.gov/.
26. South Coast Air Quality Management District. RULE 402 NUISANCE. [Online] http://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-402.pdf.
27. California Air Resources Board. GHG 1990 Emissions Level & 2020 Limit. California Air Resources Board. [Online] https://ww2.arb.ca.gov/ghg-2020-limit.
28. —. Climate Change Draft Scoping Plan. 2008.
29. —. STATUS OF SCOPING PLAN RECOMMENDED MEASURES. [Online] [Cited: September 19, 2019.]
https://ww3.arb.ca.gov/cc/scopingplan/status_of_scoping_plan_measures.pdf.
30. —. First Update to the Climate Change Scoping Plan. 2014.
31. California Legislative Information. Senate Bill No. 32. [Online] September 8, 2016. https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201520160SB3
2. 32. City of Lake Elsinore. Climate Action Plan. s.l. : Rincon Consultants, Inc., 2011.
15715-03 AQ & GHG Assessment
33. South Coast Air Quality Management District. Interim CEQA GHG Significance Threshold for Stationary Sources, Rules and Plans. [Online]
http://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases- (ghg)-ceqa-significance-thresholds/ghgboardsynopsis.pdf?sfvrsn=2.
34. —. Interim CEQA GHG Significance Threshold for Stationary Sources, Rules and Plans. [Online] http://www.aqmd.gov/hb/2008/December/081231a.htm.
35. County of Riverside. Greenhouse Gas Emissions Screening Tables. San Bernardino : Atkins, 2012.
36. Association of Environmental Professionals. 2018 CEQA California Environmental Quality Act. 2018.
37. California Air Resources Board. 2022 Scopuing Plan Documents. [Online] https://ww2.arb.ca.gov/our-work/programs/ab-32-climate-change-scoping- plan/2022-scoping-plan-documents.
15715-03 AQ & GHG Assessment
ATTACHMENT A
CALEEMOD PROPOSED PROJECT EMISSIONS MODEL OUTPUTS
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 1 / 45
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Y ear, Unmitigated
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
3. Construction Emissions Details
3.1. Site Preparation (2024) - Unmitigated
3.3. Grading (2024) - Unmitigated
3.5. Building Construction (2024) - Unmitigated
3.7. Paving (2024) - Unmitigated
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 2 / 45
3.9. Architectural Coating (2024) - Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 3 / 45
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 4 / 45
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 5 / 45
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 6 / 45
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 7 / 45
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name 15715 - Fleming Concrete Pumping Truck Y ard Construction Start Date 4/1/2024
Operational Y ear 2024
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.50
Precipitation (days) 9.20
Location 33.677925, -117.327131
County Riverside-South Coast
City Lake Elsinore
Air District South Coast AQMD
Air Basin South Coast
TAZ 5522
EDFZ 11
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.20
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 8 / 45
General Office
Building
7.50 1000sqft 0.17 7,500 0.00 — — —
Parking Lot 25.0 Space 1.48 0.00 0.00 — — —
User Defined
Commercial
7.50 User Defined Unit 0.00 0.00 0.00 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.65 2.13 24.7 18.6 0.06 1.11 3.67 4.79 1.03 1.35 2.38 — 8,149 8,149 0.21 0.91 12.2 8,438 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.56 7.80 17.8 21.4 0.04 0.74 0.21 0.95 0.68 0.05 0.73 — 3,682 3,682 0.15 0.04 0.03 3,698 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.79 0.81 5.64 6.01 0.01 0.23 0.08 0.30 0.21 0.03 0.23 — 1,174 1,174 0.05 0.02 0.12 1,182 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.14 0.15 1.03 1.10 < 0.005 0.04 0.01 0.06 0.04 < 0.005 0.04 — 194 194 0.01 < 0.005 0.02 196
2.2. Construction Emissions by Y ear, Unmitigated
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 9 / 45
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Y ear TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2024 2.65 2.13 24.7 18.6 0.06 1.11 3.67 4.79 1.03 1.35 2.38 — 8,149 8,149 0.21 0.91 12.2 8,438 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2024 2.56 7.80 17.8 21.4 0.04 0.74 0.21 0.95 0.68 0.05 0.73 — 3,682 3,682 0.15 0.04 0.03 3,698 Average
Daily
— — — — — — — — — — — — — — — — — —
2024 0.79 0.81 5.64 6.01 0.01 0.23 0.08 0.30 0.21 0.03 0.23 — 1,174 1,174 0.05 0.02 0.12 1,182 Annual — — — — — — — — — — — — — — — — — —
2024 0.14 0.15 1.03 1.10 < 0.005 0.04 0.01 0.06 0.04 < 0.005 0.04 — 194 194 0.01 < 0.005 0.02 196
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.46 0.59 1.12 4.37 0.02 0.02 0.93 0.95 0.02 0.24 0.26 6.31 1,857 1,864 0.71 0.16 4.83 1,934 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.39 0.52 1.17 3.37 0.02 0.02 0.93 0.95 0.02 0.24 0.26 6.31 1,797 1,803 0.71 0.16 0.14 1,869 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.32 0.46 0.89 2.79 0.01 0.02 0.68 0.69 0.02 0.17 0.19 6.31 1,389 1,396 0.69 0.12 1.53 1,450 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 10 / 45
Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.06 0.08 0.16 0.51 < 0.005 < 0.005 0.12 0.13 < 0.005 0.03 0.03 1.05 230 231 0.12 0.02 0.25 240
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.40 0.35 1.06 3.99 0.02 0.02 0.93 0.95 0.02 0.24 0.25 — 1,602 1,602 0.04 0.15 4.81 1,653 Area 0.06 0.23 < 0.005 0.33 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.34 1.34 < 0.005 < 0.005 — 1.35 Energy 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 245 245 0.02 < 0.005 — 246 Water — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Waste — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Refrig. — — — — — — — — — — — — — — — — 0.01 0.01
Total 0.46 0.59 1.12 4.37 0.02 0.02 0.93 0.95 0.02 0.24 0.26 6.31 1,857 1,864 0.71 0.16 4.83 1,934 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.38 0.33 1.12 3.32 0.01 0.02 0.93 0.95 0.02 0.24 0.25 — 1,543 1,543 0.05 0.15 0.12 1,590 Area — 0.18 — — — — — — — — — — — — — — — —
Energy 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 245 245 0.02 < 0.005 — 246 Water — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Waste — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Refrig. — — — — — — — — — — — — — — — — 0.01 0.01
Total 0.39 0.52 1.17 3.37 0.02 0.02 0.93 0.95 0.02 0.24 0.26 6.31 1,797 1,803 0.71 0.16 0.14 1,869 Average
Daily
— — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 11 / 45
Mobile 0.28 0.24 0.83 2.52 0.01 0.01 0.68 0.69 0.01 0.17 0.19 — 1,135 1,135 0.03 0.11 1.52 1,170 Area 0.04 0.22 < 0.005 0.22 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.92 0.92 < 0.005 < 0.005 — 0.92 Energy 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 245 245 0.02 < 0.005 — 246 Water — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Waste — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Refrig. — — — — — — — — — — — — — — — — 0.01 0.01
Total 0.32 0.46 0.89 2.79 0.01 0.02 0.68 0.69 0.02 0.17 0.19 6.31 1,389 1,396 0.69 0.12 1.53 1,450 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.05 0.04 0.15 0.46 < 0.005 < 0.005 0.12 0.13 < 0.005 0.03 0.03 — 188 188 0.01 0.02 0.25 194 Area 0.01 0.04 < 0.005 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.15 0.15 < 0.005 < 0.005 — 0.15 Energy < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 40.6 40.6 < 0.005 < 0.005 — 40.8 Water — — — — — — — — — — — 0.42 1.43 1.86 0.04 < 0.005 — 3.26 Waste — — — — — — — — — — — 0.62 0.00 0.62 0.06 0.00 — 2.18 Refrig. — — — — — — — — — — — — — — — — < 0.005 < 0.005 Total 0.06 0.08 0.16 0.51 < 0.005 < 0.005 0.12 0.13 < 0.005 0.03 0.03 1.05 230 231 0.12 0.02 0.25 240
3. Construction Emissions Details
3.1. Site Preparation (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
2.04 1.72 16.1 14.2 0.02 0.83 — 0.83 0.76 — 0.76 — 2,235 2,235 0.09 0.02 — 2,243 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 12 / 45
———————0.910.91—1.981.98——————Dust
From
Material
Movement
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.01 0.01 0.09 0.08 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 12.2 12.2 < 0.005 < 0.005 — 12.3 Dust
From
Material
Movement
— — — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.03 2.03 < 0.005 < 0.005 — 2.03 Dust
From
Material
Movement
— — — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.04 0.04 0.63 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 108 108 < 0.005 < 0.005 0.43 110 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 13 / 45
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.55 0.55 < 0.005 < 0.005 < 0.005 0.56 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.09 0.09 < 0.005 < 0.005 < 0.005 0.09 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.3. Grading (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
2.37 1.99 18.5 16.2 0.02 1.01 — 1.01 0.93 — 0.93 — 2,525 2,525 0.10 0.02 — 2,534 Dust
From
Material
Movement
— — — — — — 2.13 2.13 — 0.92 0.92 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 14 / 45
——————————————————Average
Daily
Off-Road
Equipment
0.03 0.02 0.20 0.18 < 0.005 0.01 — 0.01 0.01 — 0.01 — 27.7 27.7 < 0.005 < 0.005 — 27.8 Dust
From
Material
Movement
— — — — — — 0.02 0.02 — 0.01 0.01 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.04 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.58 4.58 < 0.005 < 0.005 — 4.60 Dust
From
Material
Movement
— — — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.05 0.83 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 144 144 0.01 < 0.005 0.57 146 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.23 0.09 6.19 1.49 0.04 0.10 1.42 1.52 0.10 0.40 0.50 — 5,480 5,480 0.10 0.88 11.6 5,758 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.47 1.47 < 0.005 < 0.005 < 0.005 1.49 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 15 / 45
Hauling < 0.005 < 0.005 0.07 0.02 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 0.01 — 60.1 60.1 < 0.005 0.01 0.05 63.0 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.24 0.24 < 0.005 < 0.005 < 0.005 0.25 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.95 9.95 < 0.005 < 0.005 0.01 10.4
3.5. Building Construction (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.54 1.28 10.9 11.6 0.02 0.44 — 0.44 0.40 — 0.40 — 2,159 2,159 0.09 0.02 — 2,167 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.54 1.28 10.9 11.6 0.02 0.44 — 0.44 0.40 — 0.40 — 2,159 2,159 0.09 0.02 — 2,167 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.71 0.59 5.06 5.39 0.01 0.20 — 0.20 0.19 — 0.19 — 1,000 1,000 0.04 0.01 — 1,003 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 16 / 45
Off-Road
Equipment
0.13 0.11 0.92 0.98 < 0.005 0.04 — 0.04 0.03 — 0.03 — 166 166 0.01 < 0.005 — 166 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.20 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 34.5 34.5 < 0.005 < 0.005 0.14 35.1 Vendor < 0.005 < 0.005 0.04 0.01 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 38.2 38.2 < 0.005 0.01 0.11 40.0 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.15 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 31.7 31.7 < 0.005 < 0.005 < 0.005 32.1 Vendor < 0.005 < 0.005 0.05 0.01 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 38.2 38.2 < 0.005 0.01 < 0.005 39.9 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.07 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 14.9 14.9 < 0.005 < 0.005 0.03 15.1 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 — 17.7 17.7 < 0.005 < 0.005 0.02 18.5 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.46 2.46 < 0.005 < 0.005 < 0.005 2.50 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 2.93 2.93 < 0.005 < 0.005 < 0.005 3.06 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.7. Paving (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 17 / 45
Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.71 0.60 5.52 7.25 0.01 0.26 — 0.26 0.24 — 0.24 — 1,103 1,103 0.04 0.01 — 1,106 Paving — 0.39 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.02 0.02 0.15 0.20 < 0.005 0.01 — 0.01 0.01 — 0.01 — 30.2 30.2 < 0.005 < 0.005 — 30.3 Paving — 0.01 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.03 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 5.00 5.00 < 0.005 < 0.005 — 5.02 Paving — < 0.005 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07 0.06 0.07 0.79 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 165 165 0.01 0.01 0.02 167 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 18 / 45
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 4.59 4.59 < 0.005 < 0.005 0.01 4.65 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.76 0.76 < 0.005 < 0.005 < 0.005 0.77 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.9. Architectural Coating (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.22 0.18 1.21 1.53 < 0.005 0.04 — 0.04 0.04 — 0.04 — 178 178 0.01 < 0.005 — 179 Architect
ural
Coatings
— 5.27 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 19 / 45
Off-Road
Equipment
0.01 < 0.005 0.03 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.88 4.88 < 0.005 < 0.005 — 4.89 Architect
ural
Coatings
— 0.14 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.81 0.81 < 0.005 < 0.005 — 0.81 Architect
ural
Coatings
— 0.03 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.35 6.35 < 0.005 < 0.005 < 0.005 6.43 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.18 0.18 < 0.005 < 0.005 < 0.005 0.18 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.03 0.03 < 0.005 < 0.005 < 0.005 0.03 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 20 / 45
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
0.37 0.34 0.20 3.82 0.01 < 0.005 0.71 0.72 < 0.005 0.18 0.18 — 773 773 0.03 0.02 3.04 783 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 User
Defined
Commercial
0.03 0.01 0.86 0.17 0.01 0.01 0.22 0.23 0.01 0.06 0.07 — 829 829 0.02 0.13 1.77 870 Total 0.40 0.35 1.06 3.99 0.02 0.02 0.93 0.95 0.02 0.24 0.25 — 1,602 1,602 0.04 0.15 4.81 1,653 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
0.35 0.32 0.22 3.15 0.01 < 0.005 0.71 0.72 < 0.005 0.18 0.18 — 714 714 0.03 0.02 0.08 721 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 21 / 45
8690.050.130.01829829—0.070.060.010.230.220.010.010.170.900.010.03User Defined
Commercial
Total 0.38 0.33 1.12 3.32 0.01 0.02 0.93 0.95 0.02 0.24 0.25 — 1,543 1,543 0.05 0.15 0.12 1,590 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
0.05 0.04 0.03 0.44 < 0.005 < 0.005 0.09 0.10 < 0.005 0.02 0.02 — 87.5 87.5 < 0.005 < 0.005 0.16 88.5 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 User
Defined
Commercial
< 0.005 < 0.005 0.12 0.02 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 100 100 < 0.005 0.02 0.09 105 Total 0.05 0.04 0.15 0.46 < 0.005 < 0.005 0.12 0.13 < 0.005 0.03 0.03 — 188 188 0.01 0.02 0.25 194
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — 125 125 0.01 < 0.005 — 126
Parking
Lot
— — — — — — — — — — — — 53.9 53.9 0.01 < 0.005 — 54.3
User
Defined
Commercial
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 179 179 0.02 < 0.005 — 180 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 22 / 45
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — 125 125 0.01 < 0.005 — 126
Parking
Lot
— — — — — — — — — — — — 53.9 53.9 0.01 < 0.005 — 54.3
User
Defined
Commercial
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 179 179 0.02 < 0.005 — 180 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — 20.7 20.7 < 0.005 < 0.005 — 20.8 Parking
Lot
— — — — — — — — — — — — 8.93 8.93 < 0.005 < 0.005 — 8.98 User
Defined
Commercial
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 29.6 29.6 < 0.005 < 0.005 — 29.8
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 66.3 66.3 0.01 < 0.005 — 66.5 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 23 / 45
0.00—0.000.000.000.00—0.00—0.000.00—0.000.000.000.000.000.00Parking Lot
User
Defined
Commercial
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 66.3 66.3 0.01 < 0.005 — 66.5 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 66.3 66.3 0.01 < 0.005 — 66.5 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 User
Defined
Commercial
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 66.3 66.3 0.01 < 0.005 — 66.5 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
< 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.0 11.0 < 0.005 < 0.005 — 11.0 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 User
Defined
Commercial
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.0 11.0 < 0.005 < 0.005 — 11.0
4.3. Area Emissions by Source
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 24 / 45
Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.17 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.01 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt
0.06 0.05 < 0.005 0.33 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.34 1.34 < 0.005 < 0.005 — 1.35 Total 0.06 0.23 < 0.005 0.33 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.34 1.34 < 0.005 < 0.005 — 1.35 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.17 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.01 — — — — — — — — — — — — — — — —
Total — 0.18 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.03 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— < 0.005 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt
0.01 0.01 < 0.005 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.15 0.15 < 0.005 < 0.005 — 0.15 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 25 / 45
Total 0.01 0.04 < 0.005 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.15 0.15 < 0.005 < 0.005 — 0.15
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Annual — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 26 / 45
General
Office
Building
— — — — — — — — — — — 0.42 1.43 1.86 0.04 < 0.005 — 3.26 Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.42 1.43 1.86 0.04 < 0.005 — 3.26
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 27 / 45
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 0.62 0.00 0.62 0.06 0.00 — 2.18
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.62 0.00 0.62 0.06 0.00 — 2.18
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — — — — — 0.01 0.01
Total — — — — — — — — — — — — — — — — 0.01 0.01
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 28 / 45
General
Office
Building
— — — — — — — — — — — — — — — — 0.01 0.01
Total — — — — — — — — — — — — — — — — 0.01 0.01
Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — < 0.005 < 0.005
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 29 / 45
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 30 / 45
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 31 / 45
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 32 / 45
Sequest — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Site Preparation Site Preparation 4/1/2024 4/2/2024 5.00 2.00 2 Grading Grading 4/3/2024 4/8/2024 5.00 4.00 4
Building Construction Building Construction 4/9/2024 11/29/2024 5.00 169 200 Paving Paving 11/18/2024 11/29/2024 5.00 10.0 10
Architectural Coating Architectural Coating 11/18/2024 11/29/2024 5.00 10.0 10
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Site Preparation Graders Diesel Average 1.00 8.00 148 0.41 Site Preparation Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Site Preparation Crawler Tractors Diesel Average 1.00 8.00 84.0 0.37 Grading Graders Diesel Average 1.00 8.00 148 0.41
Grading Crawler Tractors Diesel Average 2.00 8.00 84.0 0.37 Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 33 / 45
Building Construction Cranes Diesel Average 1.00 8.00 367 0.29 Building Construction Forklifts Diesel Average 1.00 8.00 82.0 0.20 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh
oes
Diesel Average 1.00 8.00 84.0 0.37
Building Construction Welders Diesel Average 3.00 8.00 46.0 0.45 Paving Tractors/Loaders/Backh
oes
Diesel Average 1.00 8.00 84.0 0.37
Paving Pavers Diesel Average 1.00 8.00 81.0 0.42
Paving Paving Equipment Diesel Average 1.00 8.00 89.0 0.36 Paving Rollers Diesel Average 1.00 8.00 36.0 0.38
Paving Cement and Mortar
Mixers
Diesel Average 1.00 8.00 10.0 0.56
Architectural Coating Air Compressors Diesel Average 1.00 8.00 37.0 0.48
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Site Preparation — — — —
Site Preparation Worker 7.50 18.5 LDA,LDT1,LDT2
Site Preparation Vendor — 10.2 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 10.0 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 78.3 20.0 HHDT
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 34 / 45
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 2.40 18.5 LDA,LDT1,LDT2
Building Construction Vendor 1.23 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Paving — — — —
Paving Worker 12.5 18.5 LDA,LDT1,LDT2
Paving Vendor — 10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 0.48 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area Coated
(sq ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00 0.00 11,250 3,750 3,868
5.6. Dust Mitigation
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 35 / 45
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Site Preparation — — 3.00 0.00 —
Grading — 2,500 8.00 0.00 —
Paving 0.00 0.00 0.00 0.00 1.48
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 3 74% 74%
5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
General Office Building 0.00 0%
Parking Lot 1.48 100%
User Defined Commercial 0.00 0%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Y ear and Emission Factor (lb/MWh)
Y ear kWh per Y ear CO2 CH4 N2O
2024 0.00 349 0.03 < 0.005
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Y ear VMT/Weekday VMT/Saturday VMT/Sunday VMT/Y ear 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 36 / 45
General Office
Building
82.0 6.94 2.78 21,884 1,023 86.6 34.6 273,149
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Commercial
6.00 0.51 0.20 1,601 239 20.3 8.08 63,897
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 11,250 3,750 3,868
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) General Office Building 130,824 349 0.0330 0.0040 206,900 Parking Lot 56,475 349 0.0330 0.0040 0.00
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 37 / 45
User Defined Commercial 0.00 349 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) General Office Building 1,333,003 0.00
Parking Lot 0.00 0.00
User Defined Commercial 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
General Office Building 6.98 —
Parking Lot 0.00 —
User Defined Commercial 0.00 —
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced General Office Building Household refrigerators
and/or freezers
User Defined 150 0.02 0.60 0.00 1.00
General Office Building Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 38 / 45
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Y ear Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 39 / 45
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 27.9 annual days of extreme heat Extreme Precipitation 4.25 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 16.6 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events.
Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 40 / 45
Temperature and Extreme Heat 3 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 3 1 1 3
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures. 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 41 / 45
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 82.5
AQ-PM 52.6
AQ-DPM 65.0
Drinking Water 31.7
Lead Risk Housing 79.5
Pesticides 0.00
Toxic Releases 28.9
Traffic 83.5
Effect Indicators —
CleanUp Sites 17.1
Groundwater 6.97
Haz Waste Facilities/Generators 76.7
Impaired Water Bodies 51.2
Solid Waste 9.67
Sensitive Population —
Asthma 66.1
Cardio-vascular 98.8
Low Birth Weights 49.0
Socioeconomic Factor Indicators —
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 42 / 45
Education 83.3
Housing 71.2
Linguistic 82.1
Poverty 92.9
Unemployment 93.3
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 16.19402027
Employed 19.97946875
Median HI 20.2232773
Education —
Bachelor's or higher 10.61208777
High school enrollment 100
Preschool enrollment 23.662261
Transportation —
Auto Access 22.57153856
Active commuting 38.20094957
Social —
2-parent households 44.66829206
Voting 18.82458617
Neighborhood —
Alcohol availability 43.41075324
Park access 44.29616322
Retail density 73.2580521
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 43 / 45
Supermarket access 23.3927884
Tree canopy 4.016424997
Housing —
Homeownership 22.76401899
Housing habitability 41.03682792
Low-inc homeowner severe housing cost burden 95.63711023 Low-inc renter severe housing cost burden 47.02938535
Uncrowded housing 15.89888361
Health Outcomes —
Insured adults 10.45810343
Arthritis 0.0
Asthma ER Admissions 50.6
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 7.4
Cognitively Disabled 9.6
Physically Disabled 19.5
Heart Attack ER Admissions 3.4
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 56.4
Physical Health Not Good 0.0
15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 44 / 45
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 20.2
SLR Inundation Area 0.0
Children 11.1
Elderly 88.2
English Speaking 26.7
Foreign-born 68.6
Outdoor Workers 7.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 81.1
Traffic Density 75.7
Traffic Access 23.0
Other Indices —
Hardship 86.9
Other Decision Support —
2016 Voting 37.1
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 83.0 Healthy Places Index Score for Project Location (b) 15.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) Y es 15715 - Fleming Concrete Pumping Truck Y ard Detailed Report, 11/15/2023 45 / 45
Project Located in a Low-Income Community (Assembly Bill 1550) Y es Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
Screen Justification
Construction: Construction Phases Taken from client data.
Building Construction, Paving, and Architectural Coating overlap to present a conservative analysis.
Construction schedule compressed to account for 2024 Opening Y ear.
Land Use Taken from site plan.
Construction: Off-Road Equipment T/L/B replaced with Crawler Tractor to accurately calculate disturbance for Site Preparation and Grading phases.
Standard 8 hours work days.
Construction: Architectural Coatings SCAQMD Rule 1113
Operations: Vehicle Data Trip characteristics based on information provided in the Trip Generation assessment.
Operations: Architectural Coatings SCAQMD Rule 1113
Operations: Refrigerants As of 1 January 2022, new commercial refrigeration equipment may not use refrigerants with a GWP of 150 or greater. Further, R-404A (the CalEEMod default) is unacceptable for new supermarket and cold storage systems as of 1 January 2019 and 2023, respectively.
Operations: Fleet Mix Passenger Car Mix estimated based on CalEEMod default fleet mix and the ratio of the vehicle classes (LDA, LDT1, LDT2, MDV, MCY). Truck Fleet Mix based on 4 axle trucks
15715-03 AQ & GHG Assessment
ATTACHMENT B
CALEEMOD PROPOSED PROJECT OPERATIONAL LST EMISSIONS
MODEL OUTPUTS
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 1 / 31
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 2 / 31
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 3 / 31
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 4 / 31
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 5 / 31
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 6 / 31
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Operational Y ear 2024
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.50
Precipitation (days) 9.20
Location 33.677925, -117.327131
County Riverside-South Coast
City Lake Elsinore
Air District South Coast AQMD
Air Basin South Coast
TAZ 5522
EDFZ 11
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.20
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
General Office
Building
7.50 1000sqft 0.17 7,500 0.00 — — —
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 7 / 31
Parking Lot 25.0 Space 1.48 0.00 0.00 — — —
User Defined
Commercial
7.50 User Defined Unit 0.00 0.00 0.00 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.32 0.49 0.20 0.98 < 0.005 0.01 0.01 0.02 0.01 < 0.005 0.01 6.31 292 298 0.68 0.02 0.06 320 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.25 0.42 0.20 0.74 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 0.01 6.31 290 296 0.68 0.02 0.01 318 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.22 0.39 0.16 0.78 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 0.01 6.31 281 288 0.67 0.01 0.03 309 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.04 0.07 0.03 0.14 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 1.05 46.6 47.6 0.11 < 0.005 < 0.005 51.1
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 8 / 31
Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.26 0.25 0.14 0.61 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 36.6 36.6 0.02 0.01 0.05 39.5 Area 0.06 0.23 < 0.005 0.33 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.34 1.34 < 0.005 < 0.005 — 1.35 Energy 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 245 245 0.02 < 0.005 — 246 Water — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Waste — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Refrig. — — — — — — — — — — — — — — — — 0.01 0.01
Total 0.32 0.49 0.20 0.98 < 0.005 0.01 0.01 0.02 0.01 < 0.005 0.01 6.31 292 298 0.68 0.02 0.06 320 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.24 0.23 0.15 0.69 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 36.2 36.2 0.02 0.01 < 0.005 39.2 Area — 0.18 — — — — — — — — — — — — — — — —
Energy 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 245 245 0.02 < 0.005 — 246 Water — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Waste — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Refrig. — — — — — — — — — — — — — — — — 0.01 0.01
Total 0.25 0.42 0.20 0.74 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 0.01 6.31 290 296 0.68 0.02 0.01 318 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 0.18 0.17 0.10 0.51 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 26.5 26.5 0.01 0.01 0.01 28.7 Area 0.04 0.22 < 0.005 0.22 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.92 0.92 < 0.005 < 0.005 — 0.92 Energy 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 245 245 0.02 < 0.005 — 246 Water — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Waste — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Refrig. — — — — — — — — — — — — — — — — 0.01 0.01
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 9 / 31
Total 0.22 0.39 0.16 0.78 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 0.01 6.31 281 288 0.67 0.01 0.03 309 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.03 0.03 0.02 0.09 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 4.39 4.39 < 0.005 < 0.005 < 0.005 4.74 Area 0.01 0.04 < 0.005 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.15 0.15 < 0.005 < 0.005 — 0.15 Energy < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 40.6 40.6 < 0.005 < 0.005 — 40.8 Water — — — — — — — — — — — 0.42 1.43 1.86 0.04 < 0.005 — 3.26 Waste — — — — — — — — — — — 0.62 0.00 0.62 0.06 0.00 — 2.18 Refrig. — — — — — — — — — — — — — — — — < 0.005 < 0.005 Total 0.04 0.07 0.03 0.14 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 1.05 46.6 47.6 0.11 < 0.005 < 0.005 51.1
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
0.25 0.25 0.05 0.55 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 23.7 23.7 0.01 0.01 0.04 25.9 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 User
Defined
Commercial
0.01 < 0.005 0.09 0.06 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 12.9 12.9 < 0.005 < 0.005 0.01 13.6 Total 0.26 0.25 0.14 0.61 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 36.6 36.6 0.02 0.01 0.05 39.5 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 10 / 31
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
0.24 0.23 0.05 0.63 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 23.1 23.1 0.01 0.01 < 0.005 25.3 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 User
Defined
Commercial
0.01 < 0.005 0.09 0.06 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 13.1 13.1 < 0.005 < 0.005 < 0.005 13.8 Total 0.24 0.23 0.15 0.69 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 36.2 36.2 0.02 0.01 < 0.005 39.2 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
0.03 0.03 0.01 0.08 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 2.81 2.81 < 0.005 < 0.005 < 0.005 3.09 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 User
Defined
Commercial
< 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 1.58 1.58 < 0.005 < 0.005 < 0.005 1.66 Total 0.03 0.03 0.02 0.09 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 4.39 4.39 < 0.005 < 0.005 < 0.005 4.74
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 11 / 31
126—< 0.0050.01125125————————————General
Office
Building
Parking
Lot
— — — — — — — — — — — — 53.9 53.9 0.01 < 0.005 — 54.3
User
Defined
Commercial
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 179 179 0.02 < 0.005 — 180 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — 125 125 0.01 < 0.005 — 126
Parking
Lot
— — — — — — — — — — — — 53.9 53.9 0.01 < 0.005 — 54.3
User
Defined
Commercial
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 179 179 0.02 < 0.005 — 180 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — 20.7 20.7 < 0.005 < 0.005 — 20.8 Parking
Lot
— — — — — — — — — — — — 8.93 8.93 < 0.005 < 0.005 — 8.98 User
Defined
Commercial
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 29.6 29.6 < 0.005 < 0.005 — 29.8
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 12 / 31
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 66.3 66.3 0.01 < 0.005 — 66.5 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 User
Defined
Commercial
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 66.3 66.3 0.01 < 0.005 — 66.5 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 66.3 66.3 0.01 < 0.005 — 66.5 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 User
Defined
Commercial
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 66.3 66.3 0.01 < 0.005 — 66.5 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
< 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.0 11.0 < 0.005 < 0.005 — 11.0 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 User
Defined
Commercial
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 13 / 31
Total < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.0 11.0 < 0.005 < 0.005 — 11.0
4.3. Area Emissions by Source
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.17 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.01 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt
0.06 0.05 < 0.005 0.33 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.34 1.34 < 0.005 < 0.005 — 1.35 Total 0.06 0.23 < 0.005 0.33 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.34 1.34 < 0.005 < 0.005 — 1.35 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.17 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.01 — — — — — — — — — — — — — — — —
Total — 0.18 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 14 / 31
————————————————0.03—Consum
er
Architect
ural
Coatings
— < 0.005 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt
0.01 0.01 < 0.005 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.15 0.15 < 0.005 < 0.005 — 0.15 Total 0.01 0.04 < 0.005 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.15 0.15 < 0.005 < 0.005 — 0.15
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 15 / 31
19.7—0.010.2611.28.672.55———————————General
Office
Building
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 2.55 8.67 11.2 0.26 0.01 — 19.7 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 0.42 1.43 1.86 0.04 < 0.005 — 3.26 Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.42 1.43 1.86 0.04 < 0.005 — 3.26
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 16 / 31
0.00—0.000.000.000.000.00———————————Parking
Lot
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.76 0.00 3.76 0.38 0.00 — 13.2 Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — 0.62 0.00 0.62 0.06 0.00 — 2.18
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
User
Defined
Commercial
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.62 0.00 0.62 0.06 0.00 — 2.18
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 17 / 31
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — — — — — 0.01 0.01
Total — — — — — — — — — — — — — — — — 0.01 0.01
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — — — — — 0.01 0.01
Total — — — — — — — — — — — — — — — — 0.01 0.01
Annual — — — — — — — — — — — — — — — — — —
General
Office
Building
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — < 0.005 < 0.005
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 18 / 31
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 19 / 31
CO2eRN2OCH4CO2TNBCO2BCO2PM2.5TPM2.5DPM2.5EPM10TPM10DPM10ESO2CONOxROGTOGEquipme nt
Type
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 20 / 31
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 21 / 31
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Y ear VMT/Weekday VMT/Saturday VMT/Sunday VMT/Y ear 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 22 / 31
3,5010.441.1113.121,8842.786.9482.0General Office
Building
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
User Defined
Commercial
6.00 0.51 0.20 1,601 0.96 0.08 0.03 256
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 11,250 3,750 3,868
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) General Office Building 130,824 349 0.0330 0.0040 206,900 Parking Lot 56,475 349 0.0330 0.0040 0.00
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 23 / 31
User Defined Commercial 0.00 349 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) General Office Building 1,333,003 0.00
Parking Lot 0.00 0.00
User Defined Commercial 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
General Office Building 6.98 —
Parking Lot 0.00 —
User Defined Commercial 0.00 —
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced General Office Building Household refrigerators
and/or freezers
User Defined 150 0.02 0.60 0.00 1.00
General Office Building Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 24 / 31
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Y ear Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 25 / 31
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 27.9 annual days of extreme heat Extreme Precipitation 4.25 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 16.6 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events.
Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 26 / 31
Temperature and Extreme Heat 3 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 3 1 1 3
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures. 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 27 / 31
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 82.5
AQ-PM 52.6
AQ-DPM 65.0
Drinking Water 31.7
Lead Risk Housing 79.5
Pesticides 0.00
Toxic Releases 28.9
Traffic 83.5
Effect Indicators —
CleanUp Sites 17.1
Groundwater 6.97
Haz Waste Facilities/Generators 76.7
Impaired Water Bodies 51.2
Solid Waste 9.67
Sensitive Population —
Asthma 66.1
Cardio-vascular 98.8
Low Birth Weights 49.0
Socioeconomic Factor Indicators —
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 28 / 31
Education 83.3
Housing 71.2
Linguistic 82.1
Poverty 92.9
Unemployment 93.3
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 16.19402027
Employed 19.97946875
Median HI 20.2232773
Education —
Bachelor's or higher 10.61208777
High school enrollment 100
Preschool enrollment 23.662261
Transportation —
Auto Access 22.57153856
Active commuting 38.20094957
Social —
2-parent households 44.66829206
Voting 18.82458617
Neighborhood —
Alcohol availability 43.41075324
Park access 44.29616322
Retail density 73.2580521
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 29 / 31
Supermarket access 23.3927884
Tree canopy 4.016424997
Housing —
Homeownership 22.76401899
Housing habitability 41.03682792
Low-inc homeowner severe housing cost burden 95.63711023 Low-inc renter severe housing cost burden 47.02938535
Uncrowded housing 15.89888361
Health Outcomes —
Insured adults 10.45810343
Arthritis 0.0
Asthma ER Admissions 50.6
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 7.4
Cognitively Disabled 9.6
Physically Disabled 19.5
Heart Attack ER Admissions 3.4
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 56.4
Physical Health Not Good 0.0
15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 30 / 31
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 20.2
SLR Inundation Area 0.0
Children 11.1
Elderly 88.2
English Speaking 26.7
Foreign-born 68.6
Outdoor Workers 7.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 81.1
Traffic Density 75.7
Traffic Access 23.0
Other Indices —
Hardship 86.9
Other Decision Support —
2016 Voting 37.1
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 83.0 Healthy Places Index Score for Project Location (b) 15.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) Y es 15715 - Fleming Concrete Pumping Truck Y ard (Operational LSTs) Detailed Report, 11/16/2023 31 / 31
Project Located in a Low-Income Community (Assembly Bill 1550) Y es Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
Screen Justification
Construction: Construction Phases Taken from client data.
Building Construction, Paving, and Architectural Coating overlap to present a conservative analysis.
Construction schedule compressed to account for 2024 Opening Y ear.
Land Use Taken from site plan.
Construction: Off-Road Equipment T/L/B replaced with Crawler Tractor to accurately calculate disturbance for Site Preparation and Grading phases.
Standard 8 hours work days.
Construction: Architectural Coatings SCAQMD Rule 1113
Operations: Vehicle Data Trip characteristics based on information provided in the Trip Generation assessment.
Operations: Architectural Coatings SCAQMD Rule 1113
Operations: Refrigerants As of 1 January 2022, new commercial refrigeration equipment may not use refrigerants with a GWP of 150 or greater. Further, R-404A (the CalEEMod default) is unacceptable for new supermarket and cold storage systems as of 1 January 2019 and 2023, respectively.
Operations: Fleet Mix Passenger Car Mix estimated based on CalEEMod default fleet mix and the ratio of the vehicle classes (LDA, LDT1, LDT2, MDV, MCY). Truck Fleet Mix based on 4 axle trucks 0 240120
US Feet
±
Coordinate System: NAD 1983 StatePlane California VI FIPS 0406 Feet Planning Application No. 2023-19
CUP No. 2023-09 & IDR-2023-02
Vicinity Map
I-15
I-15 SBOFF
FLINT ST
MAIN ST
I-15
RILEY ST
CAMINO DEL NORTE
ELLIS ST
POE ST
LANGSTAFF ST
MINTHORN ST
POTTERY ST
I-15 SBON
COLLIER AVE
LINDSAY ST
SPRING ST
I-15 NBON
0 200100
US Feet
±
Coordinate System: NAD 1983 StatePlane California VI FIPS 0406 Feet Planning Application No. 2023-19
CUP No. 2023-09 & IDR-2023-02
Aerial Map
Earthstar
Geographics
FLINT ST
MAIN ST
I-15 SBOFF
RILEY ST
POE ST
LANGSTAFF ST
MINTHORN ST
POTTERY ST
COLLIER AVE
SPRING ST
CAMINO DEL NORTE
I-15 NBON
I-15
I-15
Maxar
0 12562.5
US Feet
±
Coordinate System: NAD 1983 StatePlane California VI FIPS 0406 Feet Planning Application No. 2023-19
CUP No. 2023-09 & IDR-2023-02
General Plan Exhibit
BP - Business
Professional
SP - Specific
Plan
F - Floodway
HDR - High
Density
Residential
LI - Limited
Industrial
LI - Limited
Industrial
P/I -
Public/Institutional
SP - Specific
Plan
P/I -
Public/Institutional
HDR - High
Density
Residential
LI - Limited
Industrial
F - Floodway
SP -
Specific Plan
BP - Business
Professional
RILEY ST
MINTHORN ST
LANGSTAFF ST
I-15 NBON
FLINT ST
I-15
POE ST
I-15
SPRING ST
I-15 SBOFF
COLLIER AVE
0 12562.5
US Feet
±
Coordinate System: NAD 1983 StatePlane California VI FIPS 0406 Feet Planning Application No. 2023-19
CUP 2023-09 & IDR 2023-02
Zoning Exhibit
R3 - High
Density
Residential
M1 - Limited
Manufacturing
M1 -
Limited
Industrial
PI -
Public/Institutional
M1 - Limited
Manufacturing
MHD - Medium
High Density
Residential
F - Floodway
F - Floodway
M1 - Limited
Manufacturing
RILEY ST
MINTHORN ST
FLINT ST
LANGSTAFF ST
POE ST
I-15 NBON
I-15
SPRING ST
I-15
COLLIER AVE I-15 SBOFF
NOPARKINGNOPARKINGEV CAPABLEEV CAPABLEEV CAPABLE
LOADING
EV CAPABLE
AF PROPERTIES, LLCTRUCK YARD
1" = 40'
T-1SITE PLAN
SHEETSCALE:DRAWN:
EDIT DATE:PROJECT:
PLOT DATE:
K.Q.
951 201 [email protected] quon architect, llc4614 lackey rd. nw, lakebay, wa 98349LAKE ELSINORE, CA 92530 2213 P.O. BOX 1854SANTA ANA, CA
05/31/2405/31/24
Digitally signed by Dennis Kim QuonDate: 2024.05.31 15:10:28Email: [email protected] PROPERTIES, LLCAF PROPERTIES, LLCFLEMING & SONSCONCRETE PUMPING, INC.WEST MINTHORN ST / NORTH RILEY ST LAKE ELSINORE, CA 92530
1" = 40'SITE PLAN
PROJECT DATA
VICINITY MAP
PROJECT DIRECTORY
PROJECT DESCRIPTION:
OCCUPANCY AND TYPE CLASSIFICATION:
SHEET INDEX
PROPERTY INFORMATION:
APPLICABLE CODES
BUILDING:
APPLICATIONS:
FLEMING AND SONS CONCRETE PUMPING, INC.
NORTH RILEY ST C/L
WEST MINTHORN ST C/L
TEMESCAL WASH / LAKE ELSINORE OUTFLOW CHANNEL
FLOOR AREA RATIO:
PARKING REQUIREMENTS:
PARKING PROVIDED:
1/8" = 1'-0"
A-1FLOOR PLAN
SHEETSCALE:DRAWN:
EDIT DATE:PROJECT:
PLOT DATE:
K.Q.
951 201 [email protected] quon architect, llc4614 lackey rd. nw, lakebay, wa 98349LAKE ELSINORE, CA 92530 2213 P.O. BOX 1854SANTA ANA, CA
05/31/2405/31/24
Digitally signed by Dennis Kim QuonDate: 2024.05.31 15:10:28Email: [email protected] PROPERTIES, LLCAF PROPERTIES, LLCFLEMING & SONSCONCRETE PUMPING, INC.WEST MINTHORN ST / NORTH RILEY ST OFFICE
MEN'S
WOMEN'SSTOR.
STORAGE
BAY 1BAY 2BAY 3
SECURE
1/8" = 1'-0"FLOOR PLAN
OPEN SHOP
1/8" = 1'-0"EAST ELEVATION
1/8" = 1'-0"WEST ELEVATION
1/8" = 1'-0"NORTH ELEVATION
1/8" = 1'-0"SOUTH ELEVATION
EAST ELEVATION
NORTHEAST ELEVATION
NORTH ELEVATION
NORTHWEST ELEVATION
WEST ELEVATION
SOUTHWEST ELEVATION
SOUTH ELEVATION
SOUTHEAST ELEVATION
24" BOX
24" BOX
15 G. / 24" BOX
24" BOX
5 G./4' O.C.
5 G./4' O.C.
5 G./6' O.C.
1 G ./12' O.C.
5 G./3' O.C.
5 GAL./3' O.C.
5 GAL./3' O.C.
1 G ./12' O.C.
5 GAL.
5 GAL./4' O.C.
3" LAYER
PLANT PALLETTE
BOTANICAL NAME/COMMON NAMESYMBOL
8 21
30 / 15
14 112
96 73
191
19,055 S.F.
107
153
145
198
19,766 S.F.
19 68
1,072 S.F.
369 CU. YDS.
SIZE
QTY.
PROPOSED TREES:
WATER USEFACTOR
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.2
N.A.
PROPOSED VINE:
NO SYMBOL
PROPOSED SHRUBS & GROUND COVER:
PARKINSONIA 'DESERT MUSEUM' / DESERT MUSEUM PALO VERDE
QUERCUS AGRIFOLIA / COAST LIVE OAK
PINUS ELDARICA / AFGHAN PINE
STREET TREE - 50' MAX. SPACING
- GEIJERA PARVIFOLIA / AUSTRALIAN WILLOW
NOTE: PROVIDE A PRE-APPROVED ROOT BARRIER FOR ALL TREES PLANTED WITHIN 8'-0" OF HARDSCAPE OR WALLS AND PROVIDE A MINIMUM OF 3'-0"
CLEARANCE BETWEEN TREE TRUNK AND ADJACENT STRUCTURE OR WALLS
MUHLENBERGIA DUMOSA / PINK MUHLY
SALVIA LEUCANTHA / MEXICAN BUSH SAGE
HETEROMELES ARBUTIFOLIA / TOYON
BACCHARIS P. 'TWIN PEAKS' / DWARF COYOTE BUSH
AGAVE 'BLUE GLOW' / BLUE GLOW AGAVE
TRICHOSTEMA LANATUM / WOOLLY BLUE CURLS
LEUCOPHYLLUM FRUTESCENS / DWARF TEXAS RANGER
ROSMARINUS O. 'LOCKWOOD DE FOREST' / DWARF ROSEMARY
MACFYDENA UNGIS-CATI / CAT'S CLAW VINE
MUHLENBERGIA RIGENS / DEER GRASS
MEDIUM SHREDDED WOOD MULCH THROUGHOUT ALL PLANTER AREAS NOTES:
1. ALL PROPOSED TREES, SHRUBS, VINE, AND GROUND COVER ARE TO BE
IRRIGATED WITH AN AUTOMATIC ET BASED CONTROLLER AND DRIP IRRIGATION SYSTEM.
2. WOOD MULCH DEPTH REQUIREMENT IS 3" FOR ALL PLANTER AREAS.
3. TOTAL LOT AREA: 1.65 AC. / 71,874 S.F.
TOTAL LANDSCAPE AREA: 39,893 S.F. = 56%
4. TOTAL PARKING SPACES: 13 EA..
TOTAL QTY OF TREES: 8 EA. = 1 / 1.65 SPACES
MULCH:
BASINS:
NOPARKING
NOPARKING
EV CAPABLE
EV CAPABLE
EV CAPABLE
LOADING
EV CAPABLE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SMH
WV
WV
SMH
WV
SMH
ARV
WV
TMH
WV
WV
WV
WV
SMH
WV
SMH
SMH
SMH
CBMH
BOL
BOL
BOL
BOL
BOL
BOL
MAIL
TR
1273.94
1273.12
1274.92
1273.96
1274.63
1267.63
1268.11
1267.08
1267.38
1266.91
1267.07
1271.62
1271.57
1271.16
1271.53
1269.69
1269.70
1270.69
1271.38
1269.25
1269.60
1267.02
1267.31
1267.15
1265.53
1265.84
1265.75
1265.25
1266.74
1266.95
1266.71
1266.78
1272.15
1270.70
1269.18
1269.88
1271.12
1269.01
1269.29
1268.89
1269.01
1268.45
1268.24
1265.40
1266.02
1266.06
1265.36 1266.26
1265.79
1265.40
1265.76
1265.83
1266.71
1266.74
1266.73
1267.42
1267.48
1272.13
1272.43
1271.51
1271.94
1271.87
1271.51
1271.50
1271.73
1271.76
1271.53
1269.96
1269.41
1271.431270.74
1270.01
1270.68
1268.66
1268.46
1270.59
1269.37
1266.24
1265.89
1266.30
1266.59
1266.37
1265.75
1271.84
1271.24
1270.96
1272.82
1272.15
1272.82
1272.44
1272.34
1272.67
1272.061271.46
1271.43
1271.69
1269.30
1270.42
1268.291268.96
1271.80
1269.82
1267.24
1265.51
1267.24
1264.82
1267.111267.33
1267.33
1266.17
1267.31
1265.90
1267.45 1267.30
1267.89
1266.42
1267.94
1266.31
1272.57
1272.41
1273.55
1273.05
1272.61
1272.85
1271.91
1272.69
1271.60
1271.95
1271.91
1271.49
1266.90
1266.64
1267.05
1266.98
1271.52
1271.26
1269.87
1270.75
1269.77
1269.14
1269.04
1269.38
1267.64
1267.43
1267.35
1267.17
1267.71
1268.12
1268.91
1270.01
1267.64
1267.85
1267.77
1267.89
1268.93
1268.69
1269.24
1269.14
1268.68
1269.10
1269.99
1269.47
1269.49
1270.13
1269.81
1270.90
1271.96
1270.56
1269.73
1271.56
1271.43
1272.13
1271.90
1272.49
1272.16
1272.65
1272.15
1272.43
1272.48
1272.49
1272.38
1272.37
1271.98
1271.77
1271.37
1271.75
1270.53
TEMESCAL WASH / LAKE ELSINORE OUTFLOW CHANNEL
NORTH RILEY STREET
WEST MINTHORN STREET
BUILDING
8' TALL CMU WALL
ALONG WEST MINTHORN
PEDESTRIAN / ADA
PATH OF TRAVEL
CONCRETE PARKING
SURFACE THROUGHOUT
EXISTING EASEMENT
SITE RETAINING WALL6' TALL CMU WALL ALONG
TEMESCAL WASH
8' TALL CMU WALL
ALONG WEST MINTHORN
6' TALL CMU WALL ALONG
TEMESCAL WASH
6' TALL CMU WALL
ALONG NORTH RILEY
LANDSCAPE BUFFER
AVGERAGE 20'
LANDSCAPE BUFFER
AVGERAGE 20'
LANDSCAPE BUFFER
AVGERAGE 20'
TRASH ENCLOSURE
LANDSCAPE NOTES
1) ALL LANDSCAPING AND IRRIGATION TO BE INSTALLED BY OWNER OR OWNERS AGENT, IN ACCORDANCE WITH ALL LOCAL CODES AND REGULATIONS.
2) ALL LANDSCAPING SHALL BE MAINTAINED BY OWNER OR OWNERS AGENT. 3) ALL PLANTING SHALL BE CONTAINED WITHIN PROPERTY LINES OF THE LOT. 4) IRRIGATION AND PLANTING SHALL BE INSTALLED TO PROMOTE EFFICIENT USE OF WATER.
5) ALL TREES WITHIN 6' FT. MIN. OF WALLS, HARDSCAPE, OR BUILDINGS SHALL BE
INSTALLED WITH COUNTY APPROVED LINEAR BIO BARRIER ROOT CONTROL BARRIERS OR EQUAL. ROOT BARRIER SHALL NOT ENCIRCLE THE TREE ROOTBALL BUT SHALL BE
LOCATED AT EDGE OF HARDSCAPE AND EXTEND BEYOND CENTER OF TREE A MINIMUM OF 5' IN EACH DIRECTION.
6) ALL PLANTING LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ALL PLANT LOCATIONS WITH THE OWNER OR THE OWNERS REPRESENTATIVE PRIOR TO PLANTING. 7) ALL TREES SHALL BE STAKED PER COUNTY STANDARDS WITH 2-3 STAKES AND 6 TREE TIES. USE TRIPLE STAKING WITH 3" DIA. STAKES IN HIGH WIND AREAS. ALL TREES SHALL HAVE BREATHER TUBES PER COUNTY STANDARD DETAIL.
8) REFER TO LANDSCAPE CONSTRUCTION DRAWING SET FOR PLANTING DETAILS AND SPECIFICATIONS.
9) TREE PLACEMENT MINIMUMS SHALL BE: 20' FROM LIGHT STANDARDS, POWER POLES, AND DRIVE APPROACHES AND 5' FROM FIRE HYDRANTS, UTILITIES AND PROPERTY LINES, & 10' FROM ALL DRIVEWAYS, ALLEYS, OR STREET INTERSECTIONS. NO TREES ALLOWED IN SWALES.
10) ALL 2:1 SLOPES SHALL BE PLANTED AND IRRIGATED PER THE CITY OF LAKE ELSINORE CODES AND REGULATIONS. PLANTING CONCEPT MUST BE COMPLIANT WITH MINIMUM STANDARDS FOR BUILDING & SAFETY EROSION CONTROL STANDARDS. 11) ALL IRRIGATION SYSTEMS SHALL BE INSTALLED PER THE CITY OF LAKE ELSINORE CODES AND REGULATIONS.
12) ALL LANDSCAPED AREAS SHALL BE PROVIDED WITH AN AUTOMATIC IRRIGATION SYSTEM THAT PROVIDES 100% (HEAD-TO-HEAD) COVERAGE WHERE SHRUB AND TURF AREAS ARE VALVED SEPARATELY. REFER TO LANDSCAPE CONSTRUCTION DRAWING SET FOR IRRIGATION DETAILS AND SPECIFICATIONS.
13) ALL IRRIGATION SYSTEMS IN LANDSCAPE AREAS ADJACENT TO PEDESTRIAN TRAFFIC AREAS INCLUDING, BUT NOT LIMITED TO; TURF, SIDEWALKS, AND DRIVEWAYS SHALL BE INSTALLED WITH POP-UP IRRIGATION HEADS IN LIEU OF FIXED RISER HEADS. 14) ALL SHRUB PLANTER AREAS SHALL RECEIVE A 3" LAYER OF MEDIUM BARK MULCH THROUGHOUT (NO BARK MULCH IN DRAINAGE SWALE AREAS).
15) ALL LANDSCAPED AREAS SHALL BE KEPT FREE FROM WEEDS AND DEBRIS AND
MAINTAINED IN A HEALTHY, GROWING CONDITION AND SHALL RECEIVE REGULAR PRUNING, FERTILIZING, MOWING, AND TRIMMING. ANY DAMAGED, DEAD, DISEASED, OR DECAYING PLANT MATERIAL SHALL BE REPLACED WITHIN 30 DAYS FROM THE DATE OF DAMAGE.
16) ALL PROPOSED TREES, SHRUBS, VINE, AND GROUND COVER ARE CONSIDERED
DROUGHT TOLERANT AND ARE TO BE IRRIGATED WITH AN AUTOMATIC ET BASED CONTROLLER AND DRIP IRRIGATION SYSTEM.
17) MAINTENANCE RESPONSIBILITY IS TO BE BY THE PROPERTY OWNER. 2 of
See Plan
May 30, 2024
R.E.T.
Job No.
Scale
Date
DrawnSheet
AF PROPERTIES, LLC
911 E. Walnut Street
Santa Ana, CA 92701
Contact: Alan Fleming
714.550.7081
No.RevisionDate
Signature
Expiration Date
Date
L I CENSED LANDSCAPE ARCHITECT
Sheet Title
Owner
CEMENT PUMPING
TRUCK YARD
APN 377-232-006, -007 &
-009
W Minthron Street &
N Riley Street
Lake Elsinore, CA
Project
Seal
© ROBERT TAFT + ASSOCIATES
LANDSCAPE ARCHITECTURE 2024
THESE DRAWINGS AND THE
ACCOMPANYING SPECIFICATIONS AS
INSTRUMENTS OF SERVICE ARE THE
EXCLUSIVE PROPERTY OF ROBERT
TAFT + ASSOCIATES LANDSCAPE
ARCHITECTURE, AND MAY NOT BE
REPRODUCED IN ANY FORM WITHOUT
WRITTEN PERMISSION FROM THE
LANDSCAPE ARCHITECT.
Underground Service Alert
R
E
OF
B
AC LL
U
DIG
E
YO
811
Plans
CONCEPTUAL
LANDSCAPE
PLANS
ROBERT TAFT + ASSOCIATES
Temecula Valley Office:
36275 Avenida De Acacias
Temecula, California 92592
Ph.: 951.676.5688
Orange County Office:
5331 Stonehedge Court
Yorba Linda, California 92886
Ph.: 949.385.1254
Ca. Lic. No. 3669
Email: [email protected]
Web: www.RobertTaftandAssociates.com
L A N D S C A P E A R C H I T E C T U R E
DESERT MUSEUM
PALO VERDE
L1
CONCEPTUAL
LANDSCAPE PLAN
AFGHAN PINECOAST LIVE OAK
AUSTRALIAN WILLOW
CAT'S CLAW VINE
WOOLLY BLUE CURLS
PINK MUHLY GRASS
TOYON
BLUE AGAVE
DWARF TRAILING
ROSEMARY
DWARF COYOTE
BUSH
MEXICAN BUSH SAGE
TEXAS RANGER
DEER GRASS
0' 15' 30'60'
SCALE: 1"=30'
NORTH
05-31-2024
NOPARKING
NOPARKING
EV CAPABLE
EV CAPABLE
EV CAPABLE
LOADING
EV CAPABLE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SMH
WV
WV
SMH
WV
SMH
ARV
WV
TMH
WV
WV
WV
WV
SMH
WV
SMH
CBMH
BOL
BOL
BOL
BOL
BOL
BOL
MAIL
TR
1267.63
1268.11
1267.08
1267.38
1266.91
1267.07
1271.62
1271.57
1271.16
1271.53
1269.69
1269.70
1270.69
1271.38
1269.25
1269.60
1267.02
1267.31
1267.15
1265.53
1265.84
1265.75
1265.25
1266.74
1266.95
1266.71
1266.78
1272.15
1270.70
1269.18
1269.88
1271.12
1269.01
1269.29
1268.89
1269.01
1268.45
1268.24
1265.40
1266.02
1266.06
1265.36 1266.26
1265.79
1265.40
1265.76
1265.83
1266.71
1266.74
1266.73
1267.42
1267.48
1272.13
1272.43
1271.51
1271.94
1271.87
1271.51
1271.50
1271.73
1271.76
1271.53
1269.96
1269.41
1271.431270.74
1270.01
1270.68
1268.66
1268.46
1270.59
1269.37
1266.24
1265.89
1266.30
1266.59
1266.37
1265.75
1271.84
1271.24
1270.96
1272.82
1272.15
1272.82
1272.44
1272.34
1272.67
1272.061271.46
1271.43
1271.69
1269.30
1270.42
1268.291268.96
1271.80
1269.82
1267.24
1265.51
1267.24
1264.82
1267.111267.33
1267.33
1266.17
1267.31
1265.90
1267.45 1267.30
1267.89
1266.42
1267.94
1266.31
1272.57
1272.41
1273.55
1273.05
1272.61
1272.85
1271.91
1272.69
1271.60
1271.95
1271.91
1271.49
1266.90
1266.64
1267.05
1266.98
1271.52
1271.26
1269.87
1270.75
1269.77
1269.14
1269.04
1269.38
1267.64
1267.43
1267.35
1267.17
1267.71
1268.12
1268.91
1270.01
1267.64
1267.85
1267.77
1267.89
1268.93
1268.69
1269.24
1269.14
1268.68
1269.10
1269.99
1269.47
1269.49
1270.13
1269.81
1270.90
1271.96
1270.56
1269.73
1271.56
1271.43
1272.13
1271.90
1272.49
1272.16
1272.65
1272.15
1272.43
1272.48
1272.49
1272.38
1272.37
1271.98
1271.77
1271.37
1271.75
1270.53
TEMESCAL WASH / LAKE ELSINORE OUTFLOW CHANNEL
NORTH RILEY STREET
WEST MINTHORN STREET
BUILDING
8' TALL CMU WALL
ALONG WEST MINTHORN
PEDESTRIAN / ADA
PATH OF TRAVEL
CONCRETE PARKING
SURFACE THROUGHOUT
EXISTING EASEMENT
SITE RETAINING WALL6' TALL CMU WALL ALONG
TEMESCAL WASH
8' TALL CMU WALL
ALONG WEST MINTHORN
6' TALL CMU WALL ALONG
TEMESCAL WASH
6' TALL CMU WALL
ALONG NORTH RILEY
LANDSCAPE BUFFER
AVGERAGE 20'
LANDSCAPE BUFFER
AVGERAGE 20'
LANDSCAPE BUFFER
AVGERAGE 20'
TRASH ENCLOSURE
MANUFACTURER / MODEL NUMBERSIZE DETAIL
EXISTING WATER METER - SEE POINT OF CONNECTION NOTE ON PLANS1" N/A TORO P-220 SERIES ELECTRIC CONTROL VALVE AS NORMALLY CLOSED MASTER VALVEC UF DIRECT BURIAL CONTROL WIRE WITH WATERPROOF CONNECTIONS14 GA UF SYMBOL
NOT SHOWN
1"
S
E 1.5 GALLON
NETAFIM TLSOV MANUAL FLUSH VALVE FOR DRIP LINE SYSTEMS
EQUIPMENT LEGEND
FEBCO 825YA SERIES REDUCED PRESSURE BACKFLOW PREVENTER - INSTALL IN STRONG BOX SBBC-30SS STAINLESS STEEL ENCLOSURE - INSTALL WITH Y-STRAINER AS LISTED BELOW1"B TORO TFS SERIES FLOW SENSOR IN SCH 40 PVC TEED 3/4"
M
C
BP
MV
FS
ET
TORO TMC-424E SERIES AUTOMATIC MODULAR ET ADJUSTING CONTROLLER - PROVIDE ONE MODULE (TSM-8F) - WALL MOUNT INSIDE ELECTRICAL CLOSET8 STATIONQ EZFLO EZ-001-CX SERIES AUTOMATIC FERTILIZATION SYSTEM
17mm BARB P
IRRITROL 'CLIMATE LOGIC' WIRELESS ET SENSORN/A R
NOT SHOWN WILKINS YBP-80 SERIES Y-STRAINER WITH 80 MESH SCREEN - INSTALL WITH R/P ASSEMBLY1"B SPARE WIRE STUB OUT EXTRA CONTROL WIRES - LOCATE WIRES IN STANDARD VALVE BOX2 x 14 GA UF F FI
NIBCO T-580-70 TWO-PIECE BRONZE BALL VALVE - FULL PORTLINE SIZE TORO 470 SERIES QUICK COUPLING VALVE WITH LOCKING VINYL COVER3/4" TORO TPVF100 ELECTRIC CONTROL VALVE1"
G
H
I
TORO DZK-TPV-1-LF DRIP ZONE VALVE KIT W/ 150 MESH Y-FILTER & 25 PSI PRESET PRESSURE REGULATOR1"J
SCH 40 PVC IRRIGATION PRESSURE MAINLINE (1 1/2" AND SMALLER) - 18" MINIMUM COVER CLASS 315 PVC IRRIGATION MAINLINE (2" AND LARGER) - 18" MINIMUM COVERPLAN SIZE CLASS 200 PVC NON-PRESSURE LATERAL LINE - 12" MINIMUM COVERPLAN SIZE K
K
SCH 40 PVC PIPE SLEEVING - EXTEND 6" BEYOND EDGE OF HARDSCAPE - 18" MINIMUM COVERPLAN SIZEL PLAN SIZE L SCH 40 PVC WIRE SLEEVING - EXTEND 6" BEYOND EDGE OF HARDSCAPE - 18" MINIMUM COVER NETAFIM TLCV6-18xx 'TECHLINE CV' DRIP LINE TUBING WITH 0.6 GPH EMITTERS AT 18" O.C. - RUN ROWS OF TUBING AT ABOUT 18" O.C. - EVENLY BURY TUBING 2"-3" DEEP - COVER WITH MULCH17mmM / N O / P
SEE FINAL PLAN
SEE FINAL PLAN
SEE FINAL PLAN
SEE FINAL PLAN
SEE FINAL PLAN
SEE FINAL PLAN
SEE FINAL PLAN
SEE FINAL PLAN
SEE FINAL PLAN
SEE FINAL PLAN
NO SYMBOL
SYMBOLMANUFACTURER / MODEL NUMBER NOZZLE RAD PSIFLOW - GPMDETAIL QT TTTQF
TREE ROOT WATERING SYSTEM BUBBLERS
SB-360-PC2 N/A30A 1.5 (2 x 0.75 PER TREE)
H
TORO STREAM BUBBLER
TREE BUBBLER LEGEND
2 of
See Plan
May 30, 2024
R.E.T.
Job No.
Scale
Date
DrawnSheet
AF PROPERTIES, LLC
911 E. Walnut Street
Santa Ana, CA 92701
Contact: Alan Fleming
714.550.7081
No.RevisionDate
Signature
Expiration Date
Date
L I CENSED LANDSCAPE ARCHITECT
Sheet Title
Owner
CEMENT PUMPING
TRUCK YARD
APN 377-232-006, -007 &
-009
W Minthron Street &
N Riley Street
Lake Elsinore, CA
Project
Seal
© ROBERT TAFT + ASSOCIATES
LANDSCAPE ARCHITECTURE 2024
THESE DRAWINGS AND THE
ACCOMPANYING SPECIFICATIONS AS
INSTRUMENTS OF SERVICE ARE THE
EXCLUSIVE PROPERTY OF ROBERT
TAFT + ASSOCIATES LANDSCAPE
ARCHITECTURE, AND MAY NOT BE
REPRODUCED IN ANY FORM WITHOUT
WRITTEN PERMISSION FROM THE
LANDSCAPE ARCHITECT.
Underground Service Alert
R
E
OF
B
AC LL
U
DIG
E
YO
811
Plans
CONCEPTUAL
LANDSCAPE
PLANS
ROBERT TAFT + ASSOCIATES
Temecula Valley Office:
36275 Avenida De Acacias
Temecula, California 92592
Ph.: 951.676.5688
Orange County Office:
5331 Stonehedge Court
Yorba Linda, California 92886
Ph.: 949.385.1254
Ca. Lic. No. 3669
Email: [email protected]
Web: www.RobertTaftandAssociates.com
L A N D S C A P E A R C H I T E C T U R E
IRRIGATION
CONCEPT
L2
IRRITROL 'CLIMATE LOGIC' ET
SENSORET
TORO FLOW SENSOR
EZ FLOW AUTOMATIC
FERTILIZATION SYSTEM
FS
FI
NETAFIM DRIP
IRRIGATION SYSTEM
TORO STREAM BUBBLERS
FOR TREES - 2 EACH TREETORO DRIP ZONE VALVE KIT
W/ FILTER & PRESSURE
REGULATOR
0' 15' 30'60'
SCALE: 1"=30'
NORTH
TORO TMC SERIES
AUTOMATIC CONTROLLER
FEBCO 825YA BACKFLOW
PREVENTER
C
BP
5/31/2024
99 24.50
100
BOL
X1264.82
BOL
BOL
BOL
X1265.25
X1265.36
X
X
1265.40
1265.40
X1265.51
X1265.53
X
X
1265.75
1265.75
X1265.76
X1265.79
X1265.83
X1265.84
X1265.89
X1265.90X1266.02
X1266.06
X1266.17
X1266.24
X1266.26
X1266.30
X1266.31
X1266.37
X1266.42
X1266.59
X1266.64
BOL
X
X
1266.71
1266.71
X1266.73
X
X
1266.74
1266.74
BOL
X1266.78
X1266.90
X1266.91
X1266.95
X1266.98
X1267.02
X1267.05
X1267.07
X1267.08
X1267.11
X1267.15
MAIL
X1267.17
X
X
1267.24
1267.24
X1267.30
X
X
1267.31
1267.31
X
X
1267.33
1267.33
X1267.35
X1267.38
X1267.42
X1267.43
X1267.45
X1267.48
X1267.63
X
X
1267.64
1267.64
X1267.71
X1267.77
X1267.85
X
X
1267.89
1267.89
X1267.94
X1268.11
X1268.12
X1268.24
X1268.29
X1268.45X1268.46 X1268.66
X1268.68
X1268.69
X1268.89
X1268.91
X1268.93
X1268.96
XX1269.011269.01
X1269.04
X1269.10
X
X
1269.14
1269.14
X1269.18
X1269.24
X1269.25
X1269.29
X1269.30
X1269.37
X1269.38
X1269.41
X1269.47
X1269.49
X1269.60
X1269.69X1269.70
X1269.73
X1269.77
X1269.81
X1269.82
X1269.87
X1269.88 X1269.96
X1269.99
X
X
1270.01
1270.01
X1270.13
X1270.42
X1270.53
X1270.56
X1270.59
X1270.68
X1270.69
X1270.70
X1270.74
X1270.75
X1270.90
X1270.96
X1271.12
X1271.16
X1271.24
X1271.26
X1271.37
X1271.38
X
X
X
1271.43
1271.43
1271.43
X1271.46
X1271.49
X1271.50
X
X
1271.51
1271.51
X1271.52
X
X
1271.53
1271.53
X1271.56
X1271.57 X1271.60
X1271.62
X1271.69
X1271.73
X1271.75
X1271.76
X1271.77
X1271.80
X1271.84
X1271.87
X1271.90
X
X
1271.91
1271.91
X1271.94
X1271.95
X1271.96
X1271.98
X1272.06
X
X
1272.13
1272.13
X
X
X
1272.15
1272.15
1272.15
X1272.16
X1272.34
X1272.37
X1272.38
X1272.41
X
X
1272.43
1272.43
X1272.44
X1272.48
X
X
1272.49
1272.49
X1272.57
X1272.61
X1272.65
X1272.67
X1272.69
X
X
1272.82
1272.82
X1272.85
X1273.05
X1273.12
X1273.55
X1273.94
X1273.96
X1274.63
X1274.92
X1275.30
30'
20'
30'
30'
20'
30'
36'
12'
12'
9'
9'
18'
18'
26'
26'
59.85'
40'
12'
13'
JUL 21, 1978 IN BK 1978 PAGE 152623
10' SCE EASEMENT RECORDED
69.62 FS 71.20 FS
71.70 TC
71.70 FS
71.62 FS/GB
71.62 TC
69.53 FS/GB
71.70 FS 71.62 FS
71.56 FS
71.40 FS
71.26 FS
71.65 FS
71.29 FS
70.99 FS/GB
70.28 FS/GB
70.13 FS/GB
70.13 FS/GB
69.82 FS/GB
69.37 FS
71.56 FS
71.37 FS
66.52 FL
67.02 TC
66.83 FL
67.33 TC
67.28 FL
67.78 TC
68.32 FL
68.82 TC
69.32 FL
69.82 TC
64.36 FL
64.86 TC
69.92 FL
70.42 TC
65.38 FL
65.88 TC
PROPOSED 6" CURB AND GUTTER
PROPOSED 6" CURB AND GUTTER
PROPOSED RIGHT-OF-WAY DEDICATION
70.85 FL
68.67 FS
68.35 FL
PROPOSED TRASH ENCLOSURE
PROJECT LOCATION
VBMP=221.76 CF
A=132 SF
BIO-RETENTION TRENCH DMA 3
VBMP=432.50 CF
A=250 SF
BIO-RETENTION TRENCH DMA 4
VBMP=1207.5 CF
A=690 SF
BIO-RETENTION TRENCH DMA 2
71.26 FL
EXISTING CATCH BASIN
68.47 FS
70.24 FS70.02 FS
67.90 FG
63.65 IE
67.90 TG
70.70 FG
66.45 IE
70.70 TG
70.65 FG
66.40 IE
70.65 TG
SAWCUT EXISTING AC PAVEMENT
REMOVE EXISTING AC PAVEMENT SAWCUT EXISTING AC PAVEMENT
REMOVE EXISTING AC PAVEMENT
SAWCUT EXISTING AC PAVEMENT
REMOVE EXISTING AC PAVEMENT
SCALE: 1" = 20'
20 0 20 40 e n g i n e e r i n g, i n c
MTH2
(951) 850-2190
Riverside, CA 92506
639 Lakewood Drive
urban design and planning
civil water resources storm water
www.mth2engineering.com
D:\MTH2\Engineering\2022_19 Lake Elsinore\Civil\2022_19exb02_Prelim_Grading_Plan.dgn 22-MAY-2024JOB 2022_19 PLOTTED:
IN THE CITY OF LAKE ELSINORE
TRUCK YARD
FLEMING AND SONS CONCRETE PUMPING, INC
AF PROPERTIES, LLC
PRELIMINARY GRADING PLAN
W
M
IN
TH
O
R
N
STR
EET
N RILEY STREET
N LANGSTAFF STREET
WM
EXISTING BUILDING
EXISTING CONTOUR MAJOR
EXISTING CONTOUR MINOR
EXISTING CURB
EXISTING SIGN
EXISTING WATER METER
PROPOSED BUILDING
PROPOSED CURB
PROPOSED ELEVATION
PROPOSED EDGE OF PCC PAVING
EXISTING STREET LIGHT
X
EXISTING POWER POLE
EXISTING SEWER MANHOLE SMH
EXISTING TELEPHONE RISER
EXISTING SEWER
EXISTING SPOT ELEVATION
PROPOSED WALL - CONCRETE OR MASONRY
EXISTING FENCE - CHAINLINK
EXISTING FENCE - TUBE STEEL
EXISTING FENCE - WOOD
EXISTING WALL - CONCRETE OR MASONRY
EXISTING ELECTRIC - OVERHEAD
PROPOSED PCC PAVEMENT
PROPOSED LANDSCAPE AREA
PROPOSED GRADEBREAK LINE
EXISTING PROPERTY LINE
EXISTING CENTERLINE
EXISTING BOUNDARY
EXISTING RIGHT-OF-WAY LINE
EXISTING EDGE OF CONCRETE
LEGEND
24.50 TR
SHEET 1 OF 1
ENGINEER/CONTACT PERSON
REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA.
THIS PLAN WAS PREPARED UNDER THE DIRECTION OF MARTEN L. ANDERSON, A
ASSESSOR'S PARCEL NUMBER
22-MAY-2024
BENCHMARK
BASIS OF BEARINGS
R
EE
NIGNE LANOISSEFORP DERETSI
G
E
R
AINROFILAC FO ETATS LIVIC
N
OSREDNA .L NETRA
M No. 51313
Exp. 6-30-24
377-232-006, -007 AND -009
(951) 850-2190
RIVERSIDE, CA 92506
639 LAKEWOOD DRIVE
MTH2 ENGINEERING, INC.
RCE 51313
MARTEN L. ANDERSON DATE (714) 550-7081
CONTACT: ALAN FLEMING
SANTA ANA, CA 92701
911 E WALNUT STREET
AF PROPERTIES, LLC
BCR.
2' FENCE AROUND AN IRRIGATION VALVE, A CHISELED "O" ON THE TOP OF CURB AT THE OF MAIN STREET, 3.0 FEET WESTERLY OF A FIRE HYDRANT, 5.0 FEET NORTHERLY OF A SOUTHERLY CORNER OF THE INTERSECTION, 26.0 FEET EASTERLY OF THE CENTERLINE
AT THE INTERSECTION OF POTTERY STREET AND MAIN STREET AT THE MOST ELEVATION = 1282.46 FEET (DATE 9/1993)
CITY OF LAKE ELSINORE BENCHMARK DESIGNATION A-93-09
THE COUNTY RECORDER, RIVERSIDE COUNTY.
STREET BEING N19°02' 30"E PER RECORD OF SURVEY RSB 91/5-13 IN THE OFFICE OF
THE BEARINGS SHOWN HEREON ARE BASED ON THE CENTERLINE OF LANGSTAFF OWNER
FEMA FLOODZONE
ZONE X PER FIRM MAP NO. 06065C2037G, EFFECTIVE DATE AUG 28, 2008
5.41'
'27.023
'69.616
435.23'
68.24'
81.58'
APN 377-232-006
APN 377-232-007
APN 377-232-009
APN 377-232-008
16.19'
FFE = 71.70
0.50%
1.00%
1.00%
1.50%
1.50%
0.40% 60' VC
75' VC
1.50%
5.18%
0.57% 1.25%0.57%
2.58%
4.48%
0.73%
50' VC
2.89%
LEGAL DESCRIPTION
OF OFFICIAL RECORDS OF RIVERSIDE COUNTY, CALIFORNIA.
ORDER OF CONDEMNATION RECORDED MARCH 6, 1996 AS INSTRUMENT NO. 96-80466
FLOOD CONTROL AND WATER CONSERVATION DISTRICT BY THAT CERTAIN FINAL RECORDER RIVERSIDE COUNTY, CALIFORNIA. AS CONVEYED TO RIVERSIDE COUNTY OF RECORDS OF SURVEY, PAGES 5 THROUGH 13, INCLUSIVE, OFFICE OF THE PARCEL 3040-46 AS SHOWN ON RECORD OF SURVEY FILED MARCH 5, 1992, IN BOOK 91 EXCEPTING THEREFROM:
DIEGO COUNTY RECORDS.
THE CITY OF LAKE ELSINORE AS SHOWN BY MAP ON FILE IN BOOK 8, PAGE 378 SAN LOTS 21, 22, AND 23 OF BLOCK 86 OF ELSINORE MAP OF HEALDS RESUBDIVISION, IN PARCEL 2:
BY OPERATION OF LAW.
WITH ANY PORTION OF VACATED ALLEY LYING ADJACENT TO LOT 19, AS WOULD PASS NO. 93-420648 OF OFFICIAL RECORDS OF RIVERSIDE COUNTY, CALIFORNIA TOGETHER CONSERVATION DISTRICT BY DEED RECORDED OCTOBER 26, 1993 AS INSTRUMENT
CALIFORNIA, AS CONVEYED TO RIVERSIDE COUNTY FLOOD CONTROL AND WATER 91, PAGES 5 THROUGH 13, RECORDS OF SURVEY, COUNTY OF RIVERSIDE, STATE OF NORTHEASTERLY OF PARCEL 3040-20DD OF RECORD OF SURVEY MAP FILE IN BOOK MAPS, PAGE 378 RECORDS OF SAN DIEGO COUNTY, LYING EASTERLY AND HEALD'S RESUBDIVISION OF ELSINORE, AS SHOWN BY MAP ON FILE IN BOOK 8 OF THOSE PORTIONS OF LOTS 7, 9, 11, 13, 15, 17, 19, 24, 25 AND 26 OF BLOCK 86 OF PARCEL 1:
1.25%
2.25%
'73.281=L '00.524=R "01'53°42=
5'
5'
TYP
TYP
4.50%1.50%
4.50%
4.5%
0.75%
ESTIMATED EXCAVATION:
ESTIMATED EMBANKMENT:
ESTIMATED GRADING QUANTITIES
PROPOSED TRUCK PARKING
16.67'
73.40'
EXISTING WATER VALVE WV
3,000 C.Y.
500 C.Y.
PROPOSED BIO-RETENTION FACILITY
NOT TO SCALE
VICINITY MAP
15 W
MINTHRON ST
VA REILLOC
N
R
ILE
Y
S
T
N
M
A
IN
S
TW FLINT ST
W FLINT ST
L
E
N
N
A
H
C TELTUO ERONISLE EKAL
PROPOSED ADA PATH OF TRAVEL
LAKE ELSINORE OUTLET CHANNEL
10.00%
12.00%
12.00%
10.35%
PROPOSED 4' MAX HEIGHT RETAINING WALL
PROPOSED AC PAVEMENT
WV
WV
WV
ARV
WV
SMH
SMHSMH
CBMH
SMH
TR
SMH
TMH
SMH WV
WVWV
WV
WV
SMH
P
A
R
K
IN
G
N
O
P
A
R
K
IN
G
N
O
E
V
C
A
P
A
B
LE
E
V
C
A
P
A
B
LE
E
V
C
A
P
A
B
LE
LOADING
E
V
C
A
P
A
B
LE
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Lake Elsinore, California, will hold a Public Hearing on November 19, 2024 at the Lake Elsinore Cultural Center, 183 North Main Street, Lake Elsinore, California, 92530, at 6:00 p.m., or as soon thereafter as the matter may be heard, to consider the following:
Planning Application No. 2023-19 (Fleming and Sons Concrete Yard): The proposed project is a request by Kim Quon, Kim Quon Architect, LLC , for an Industrial Design Review (IDR No. 2023-02) and Conditional Use Permit (CUP No. 2023- 09) to establish and operate a contractor yard and a 7,500 square-foot premanufactured building with an 850 square-foot administrative office with an outdoor storage area (Fleming and Sons Concrete Pumping, Inc .). The proposed project also includes onsite and offsite improvements. The project site is located on an approximately 1.65-acre site within th e Limited Manufacturing (M-1) District on the southwest corner of West Minthorn Street and North Riley Street (A PNs: 377-232-006, 377- 232-007, and 377-232-009).
The proposed project is exempt from the California Environmental Quality Act (CEQA), pursuant to California Environmental Quality Act (Cal. Pub. Res. Code §§21000 et seq.: “CEQA”) and the CEQA Guidelines (14 C.C.R. §§ 15000 et seq.) pursuant to CEQA Guidelines Section 15332 (In- Fill Development).
ALL INTERESTED PERSONS are invited to submit written information, express opinions or otherwise submit written evidence by email to [email protected] .
If you wish to legally challenge any action taken by the City on the above matter, you may be limited to raising only those issues you or someone else at the Public Hearing described in this notice, or in written correspondence delivered to the City prior to or at the Public Hearing. If you require accommodation to participate in a Public Hearing, please contact the Administrative Secretary at (951) 674-3124 ext. 297. All Agenda materials are available for review on the City’s website at www.lake-elsinore.org the Friday before the Public Hearing.
FURTHER INFORMATION on this item may be obtained by contacting Carlos Serna, Associate Planner in the Planning Division at [email protected] or (951) 674-3124, ext. 916.
Damaris Abraham,
Community Development Director
PC NOPH PA 2023-19 (Fleming and Sons) - Page 1 of 1
3512 14 Street
Riverside, California 92501
(951) 368-9229
[email protected]
City of Lake Elsinore
130 South Main Street
Lake Elsinore, California 92530
Account Number: 5209153
Ad Order Number: 0011702104
Customer's Reference/PO Number:
Publication: The Press-Enterprise
Publication Dates: 11/09/2024
Total Amount: $333.95
Payment Amount: $0.00
Amount Due: $333.95
Notice ID: JNDpLTr6a08xDXjvVuRV
Invoice Text: [https://res.cloudinary.com/dgqq2xsfd/image/upload/enotice- production/exports/1730935748088/image001.jpg] NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Lake Elsinore, California, will hold a Public Hearing on November 19, 2024 at the Lake Elsinore Cultural Center, 183 North Main Street, Lake Elsinore, California, 92530, at 6:00 p.m., or as soon thereafter as the matter may be heard, to consider the following: Planning Application No. 2023-19 (Fleming and Sons Concrete Yard): The proposed project is a request by Kim Quon, Kim Quon Architect, LLC, for an Industrial Design Review (IDR No. 2023-02) and Conditional Use Permit (CUP No. 2023-09) to establish and operate a contractor yard and a 7,500 square-foot premanufactured building with an 850 square-foot administrative office with an outdoor storage area (Fleming and Sons Concrete Pumping, Inc.). The proposed project also includes onsite and offsite improvements. The project site is located on an approximately 1.65- acre site within the Limited Manufacturing (M-1) District on the southwest corner of West Minthorn Street and North Riley Street (APNs: 377-232-006, 377- 232-007, and 377-232-009). The proposed project is exempt from the California Environmental Quality Act (CEQA), pursuant to California Environmental Quality Act (Cal. Pub. Res.
Code §§21000 et seq.: “CEQA”) and the CEQA Guidelines (14 C.C.R. §§ 15000 et seq.) pursuant to CEQA Guidelines Section 15332 (In-Fill Development). ALL INTERESTED PERSONS are invited to submit written information, express opinions or otherwise submit written evidence by email to [email protected] . If you wish to legally challenge any action taken by the City on the above matter, you may PC NOPH PA 2023-19 (Fleming and Sons) - Page 1 of 1
The Press-Enterprise
3512 14 Street
Riverside, California 92501
(951) 368-9229
City of Lake Elsinore
130 South Main Street
Lake Elsinore, California 92530
Publication: The Press-Enterprise
PROOF OF PUBLICATION OF
Ad Desc: 0011702104
FILE NO. 0011702104
PROOF OF PUBLICATION
I am a citizen of the United States. I
am over the age of eighteen years and
not party to or interested in the above-
entitled matter. I am an authorized
representative of THE PRESS-
ENTERPRISE, a newspaper of general
circulation, printed and published daily
in the County of Riverside, and which
newspaper has been adjudicated a
newspaper of general circulation by the
Superior Court of the County of
Riverside, State of California, under
date of April 25, 1952, Case Number
54446, under date of March 29, 1957,
Case Number 65673, under date of
August 25, 1995, Case Number
267864, and under date of September
16, 2013, Case Number RIC 1309013;
that the notice, of which the annexed is
a printed copy, has been published in
said newspaper in accordance with the
instructions of the person(s) requesting
publication, and not in any supplement
thereof on the following dates, to wit:
11/09/2024
I certify (or declare) under the penalty
of perjury that the foregoing is true and
correct.
Date: November 9, 2024.
At: Riverside, California
______________________________
Signature
NOTIFICATION PACKAGE
AF Properties / N Riley St & W Minthorn St Lake Elsinore APNs 377232006,377232007,377232009
INCLUDES:
500' OWNER LIST*
*expanded to include 30 unique owners
500' RADIUS MAP
EXCEL / WORD LABEL TEMPLATE
CERTIFICATION
COUNT: 42 (duplicates consolidated)
PREPARED 10/17/2024
FILE #350129
4000 Barranca Pkwy #250 Irvine CA 92604
(949) 494-6105
[email protected]
In order for the application to be deemed complete please return the completed, notarized affidavit to the assigned case planner at your earliest convenience.
N Riley St & W Minthorn St, APNs 377232006,377232007,37723200917thOctober24500N Riley St & W Minthorn St10/17/202417thOctober24 Laura Emerson
07/18/2026
374-052-009
Rosa Idalia Marcia
2119 S Longwood Ave
Los Angeles CA 90016
374-052-010
Prop Rmt
26 Calle De Princesa
Coto De Caza CA 92679
374-061-001
Inv Group Chloe
4200 Chino Hills Pkwy #255
Chino Hills CA 91709
374-061-002
Ruby Blue
3537 5th Ave
Los Angeles CA 90018
374-061-003
Dennis Miyasako
1590 Rosecrans Ave
Manhattan Bch CA 90266
374-061-004
Lawrence M Aragon
19831 Katy Way
Corona CA 92881
374-061-019,21
Attridge Trust
273 E 20th St
Costa Mesa CA 92627
374-062-018
Banayan J & S Family Trust Dtd
10420 Windtree Dr
Los Angeles CA 90077
374-062-022,23,180-50,52;231-
Riverside County Flood Cont
1995 Market St
Riverside CA 92501
377-180-007,51,231-11
Donald A Nordine
14259 Imperial Highway
La Mirada CA 90638
377-180-044
Julio Ceja
2911 S Main St #C
Santa Ana CA 92707
377-190-013
Extra Space Prop 102
Po Box 800729
Dallas TX 75380
377-220-003,19,21
Francis Vista Inv
1820 E Garry Ave #210
Santa Ana CA 92705
377-220-008
State Of California
P O Box 231
San Bernardino CA 92403
377-220-013
Bailey Annette & Gary Trust
Po Box 431
Sun City CA 92586
377-220-030,35,36
Gd Barnes Real Prop Co
7051 Avenida De Santiago
Anaheim CA 92807
377-220-037
Ra & B Dev
328 N State St
Hemet CA 92543
377-231-009
Yadira Zuniga
1373 E Davidson St
San Bernardino CA 92408
377-231-010
Jeanette Ball Leblanc
42308 Bridges Ct
Indio CA 92203
377-231-012
Elizabeth V Mccampbell
1908 19th St #F
Santa Monica CA 90404
377-231-018,19
Maria De Jesus Huerta Olquin
3482 Iowa Ave #D
Riverside CA 92507
377-231-020,21
Rudolph E Anthony
1653 W 127th St
Los Angeles CA 90047
377-231-023
Maria Jazmine Delone
31905 Birchwood Dr
Lake Elsinore CA 92532
377-231-024
Aida Ibarra
20340 Layton St
Corona CA 92881
377-231-025
Fernando Perez Rojas
513 Langstaff St
Lake Elsinore CA 92530
377-231-029,232-5,061-23,25,062-
City Of Elsinore
130 S Main St
Lake Elsinore CA 92530
377-231-038
Theodore Skaff
64 Feather Rdg
Mission Viejo CA 92690
377-231-039
Entrust Administration
555 12th St #1250
Oakland CA 94607
377-231-040
Zaher Azzawi
9176 Whirlaway Ct
Rancho Cucamonga CA 91737
377-232-006,7,9
Af Properties Llc
Po Box 1854
Santa Ana CA 92702
377-241-001,18
Elisa F Reyes
522 N Riley St
Lake Elsinore CA 92530
377-241-003
County Of Riverside
P O Box 1180
Riverside CA 92502
377-241-004,19
M&d Prop
1095 Montecito Dr
Corona CA 92879
377-241-005,6,7,8,9,12,16
Prop Minthorn
202 Minthorn St
Lake Elsinore CA 92530
377-241-021
Iron Works Advance
945 W Markham St
Perris CA 92571
377-242-003
James F Kelly
520 Spring St
Lake Elsinore CA 92530
377-242-004,5
Kenneth M Chaffin
15073 Heather Ln
Lake Elsinore CA 92530
377-242-006,7
Matt Allan Trout
17843 Glen Hollow Way
Riverside CA 92504
377-242-023
Clement L Cohen
4605 Park Adelfa
Calabasas CA 91302
377-242-028
Lumos 401k Trust Dtd 09/01/11
2618 San Miguel #503
Newport Beach CA 92660
377-250-012
Angelina Contreras Solis
131 W Minthorn St
Lake Elsinore CA 92530
377-250-013
M Gillen
401 B St #900
San Diego CA 92101
APN Name
374-052-009 Rosa Idalia Marcia
374-052-010 Prop Rmt
374-061-001 Inv Group Chloe
374-061-002 Ruby Blue
374-061-003 Dennis Miyasako
374-061-004 Lawrence M Aragon
374-061-019,21 Attridge Trust
374-062-018 Banayan J & S Family Trust Dtd 8/25/2023
374-062-022,23,180-50,52;231-32,232-3,8,10;061-27 Riverside County Flood Cont 377-180-007,51,231-11 Donald A Nordine
377-180-044 Julio Ceja
377-190-013 Extra Space Prop 102
377-220-003,19,21 Francis Vista Inv
377-220-008 State Of California
377-220-013 Bailey Annette & Gary Trust
377-220-030,35,36 Gd Barnes Real Prop Co
377-220-037 Ra & B Dev
377-231-009 Yadira Zuniga
377-231-010 Jeanette Ball Leblanc
377-231-012 Elizabeth V Mccampbell
377-231-018,19 Maria De Jesus Huerta Olquin
377-231-020,21 Rudolph E Anthony
377-231-023 Maria Jazmine Delone
377-231-024 Aida Ibarra
377-231-025 Fernando Perez Rojas
377-231-029,232-5,061-23,25,062-24,231-3,28,31 City Of Elsinore 377-231-038 Theodore Skaff
377-231-039 Entrust Administration
377-231-040 Zaher Azzawi
377-232-006,7,9 Af Properties Llc
377-241-001,18 Elisa F Reyes
377-241-003 County Of Riverside
377-241-004,19 M&d Prop
377-241-005,6,7,8,9,12,16 Prop Minthorn
377-241-021 Iron Works Advance
377-242-003 James F Kelly
377-242-004,5 Kenneth M Chaffin
377-242-006,7 Matt Allan Trout
377-242-023 Clement L Cohen
377-242-028 Lumos 401k Trust Dtd 09/01/11
377-250-012 Angelina Contreras Solis
377-250-013 M Gillen
Address City State Zip
2119 S Longwood Ave Los Angeles CA 90016
26 Calle De Princesa Coto De Caza CA 92679
4200 Chino Hills Pkwy #255 Chino Hills CA 91709
3537 5th Ave Los Angeles CA 90018
1590 Rosecrans Ave Manhattan Bch CA 90266
19831 Katy Way Corona CA 92881
273 E 20th St Costa Mesa CA 92627
10420 Windtree Dr Los Angeles CA 90077
1995 Market St Riverside CA 92501
14259 Imperial Highway La Mirada CA 90638
2911 S Main St #C Santa Ana CA 92707
Po Box 800729 Dallas TX 75380
1820 E Garry Ave #210 Santa Ana CA 92705
P O Box 231 San Bernardino CA 92403
Po Box 431 Sun City CA 92586
7051 Avenida De Santiago Anaheim CA 92807
328 N State St Hemet CA 92543
1373 E Davidson St San Bernardino CA 92408
42308 Bridges Ct Indio CA 92203
1908 19th St #F Santa Monica CA 90404
3482 Iowa Ave #D Riverside CA 92507
1653 W 127th St Los Angeles CA 90047
31905 Birchwood Dr Lake Elsinore CA 92532
20340 Layton St Corona CA 92881
513 Langstaff St Lake Elsinore CA 92530
130 S Main St Lake Elsinore CA 92530
64 Feather Rdg Mission Viejo CA 92690
555 12th St #1250 Oakland CA 94607
9176 Whirlaway Ct Rancho Cucamonga CA 91737
Po Box 1854 Santa Ana CA 92702
522 N Riley St Lake Elsinore CA 92530
P O Box 1180 Riverside CA 92502
1095 Montecito Dr Corona CA 92879
202 Minthorn St Lake Elsinore CA 92530
945 W Markham St Perris CA 92571
520 Spring St Lake Elsinore CA 92530
15073 Heather Ln Lake Elsinore CA 92530
17843 Glen Hollow Way Riverside CA 92504
4605 Park Adelfa Calabasas CA 91302
2618 San Miguel #503 Newport Beach CA 92660
131 W Minthorn St Lake Elsinore CA 92530
401 B St #900 San Diego CA 92101