Cities Index.
Exhibit A - Proposal

Lake Elsinore City Council
February 11, 2025

Document
Exhibit A - Proposal
Meeting
February 11, 2025
Body
Lake Elsinore City Council
Original file
780 KB
Text extracted from the city's file for reading and search. Open the original on lakeelsinore.primegov.com. That file is the official record.

UNITEDCARPORTS.COM
Metal Carports • Barns • RV Covers • Garages • Sheds
United Carports LLC
7280 Sycamore Canyon Blvd
Riverside, CA 92508
Ph. 800-757-6742
Fx. 800-757-6742
January 14th, 2025

DESIGN BUILD PROPOSAL

STORM STADIUM EXPANSION BUILDING
Prepared for: Storm Stadium - City of Lake Elsinore
500 D
iamond Dr
Lake Elsinore, CA 92595
The following proposal is for a design build custom pre-fabricated steel building. This will also include an interior mezzanine with light weight concrete deck for the entire footprint creating storage space overhead while maintaining the floor level sq
uare footage.

DESIGN AND LAYOUT
Phase #1
Structural and foundation engineering will be ordered based on the specifications outlined in this proposal.

Typical turnaround time for both engineers to complete work are approximately 45 days. City of Lake Elsinore to handle the permit process and provide the building permit at the start of construction.

SITE PREPARATION & FOUNDATION
Phase #2
Site Prep: Based on level ground to start. Foundation elevation provided by City of Lake Elsinore to match existing structure finished floor elevation. Dig Footings and install rebar per engineering. Pier and strip foot­ ings will be designed by the foundation engineer to match all state and local code ordinances.

UNITEDCARPORTS.COM United Carports LLC
7280 Sycamore Canyon Blvd
Riverside, CA 92508
Ph. 800-757-6742
Metal Carports • Barns • RV Covers • Garages • Sheds
Phase #3
Foundation: Pour footings and slab as a monolithic pour. 50'x49'6"x6" concrete pad above above grade, 4,000 psi mix, big rock mix. Hard troweled or broom finish. Saw cut joints day after the pour. Remove all forms and debris prior to erection of building. Includes concrete pumper.

Phase #4

STRUCTURE
50' WIDTH X 49'6" LENGTH X 20'
EAVE 110 MPH WIND RATING
• Vertical roof
• Fully Enclosed (Vertically Sheeted)
• 26
Gauge PBR Paneling (Inverted Rib)
•
3 - 12'x17'6" Commerical Sectional Doors (Chain Drive) • 3 - Commercial Man Doors (36"x80")
• H
old downs, strapping and galvanized shear wall
• Radiant / Vapor Barrier
• 2 Gable Louver Vents
• 1 Exhaust fan
• Gutter and Downspouts on Eave Sides
• 4' Wainscot (2 tone siding)
• Color Match Screws
• Installation
Equipment Supplied (Reach and Scissors)
• Prevailing
Wage

MEZZANINE
48' WIDTH X 48' LENGTH X 10' HEIGHT
• Inside Clearance to Joists 8'
• Inside Clearance to Rafter 9'
• B-Deck Panel Sub-floor
• Light-weight Concrete Decking
• Engineered for 125 lbs psf Live Load
• 4' Wide Metal Staircase

SITE CLEANUP
Phase #5
Final: Remove all trash, debris and any remaining building materials from building site. Get final inspection from city building department.

COMPLETE PROJECT • $346,000