B-8
CITY OF LAKE ELSINORE
CIP Project No. Z10001
SECTION C
BID SCHEDULE
1-47
C-9
CITY OF LAKE
ELSINORE
CIP Project No. Z10001
BIDDER’S PROPOSAL
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
Company: _________________________________________________ Honorable Mayor, Members of the Council:
In accordance with the Notice Inviting Bids pertai ning to the receiving of electronic proposals by the City of Lake Elsinore for the above titled improvement, the undersigned hereby proposes to furnish all Work to be performed in accordance with the Specifications, Standard Drawings, and the Contract Documents, for the unit price or lump sum set forth in the following schedule:
BID SCHEDULE
BASE BID: REMOVE AND REPLACE OF EXISTING 4” PCC SIDEWALK:
ITEM NO. CODE DESCRIPTION OF ITEMS UNIT COST (FIGURES)
1 1-80 Sq. Ft. Per Sq. Ft.
2 81-160 Sq. Ft. Per Sq. Ft.
3 161-240 Sq. Ft. Per Sq. Ft.
4 241-320 Sq. Ft. Per Sq. Ft.
5 321-400 Sq. Ft. Per Sq. Ft.
6 401-480 Sq. Ft. Per Sq. Ft.
7 481-560 Sq. Ft. Per Sq. Ft.
8 561-640 Sq. Ft. Per Sq. Ft.
9 641-720 Sq. Ft. Per Sq. Ft.
10 721 and Greater Sq. Ft. Per Sq. Ft.
BASE BID: INSTALL 4” PCC SIDEWALK:
ITEM NO. CODE DESCRIPTION OF ITEMS UNIT COST (FIGURES)
11 1-80 Sq. Ft. Per Sq. Ft.
12 81-160 Sq. Ft. Per Sq. Ft.
13 161-240 Sq. Ft. Per Sq. Ft.
14 241-320 Sq. Ft. Per Sq. Ft.
15 321-400 Sq. Ft. Per Sq. Ft.
16 401-480 Sq. Ft. Per Sq. Ft.
17 481-560 Sq. Ft. Per Sq. Ft.
18 561-640 Sq. Ft. Per Sq. Ft.
19 641-720 Sq. Ft. Per Sq. Ft.
Aneen Construction, Inc.
20 20
20 20
20 20
20 20
20 20
18 18
18 18
18 18
18 18
18 C-10
20 721 and Greater Sq. Ft. Per Sq. Ft.
BASE BID: 6” REMOVE & REPLACE OF EXISTING PCC CURB & GUTER TYPE 6:
ITEM NO. CODE DESCRIPTION OF ITEMS UNIT COST (FIGURES)
21 1-16 L.F. Per L.F.
22 17-32 L.F. Per L.F.
23 33-48 L.F. Per L.F.
24 49-64 L.F. Per L.F.
25 65-80 L.F. Per L.F.
26 81-96 L.F. Per L.F.
27 97-112 L.F. Per L.F.
28 113-128 L.F. Per L.F.
29 129-144 L.F. Per L.F.
30 145 and Greater L.F. Per L.F.
BASE BID: 8” REMOVE & REPLACE TYPE 8 PCC CURB & GUTTER:
ITEM NO. CODE DESCRIPTION OF ITEMS UNIT COST (FIGURES)
31 1-16 L.F. Per L.F.
32 17-32 L.F. Per L.F.
33 33-48 L.F. Per L.F.
34 49-64 L.F. Per L.F.
35 65-80 L.F. Per L.F.
36 81-96 L.F. Per L.F.
37 97-112 L.F. Per L.F.
38 113-128 L.F. Per L.F.
39 129-144 L.F. Per L.F.
40 145 and Greater L.F. Per L.F.
18 48
48 48
48 48
48 48
48 48
48 50
50 50
50 50
50 50
50 50
50 C-11
BASE BID: INSTALL 6” PCC RESIDENTIAL DRIVE APPROACHES:
ITEM NO. CODE DESCRIPTION OF ITEMS UNIT COST (FIGURES)
41 1-60 Sq. Ft. Per Sq. Ft.
42 61-120 Sq. Ft. Per Sq. Ft.
43 121 and Greater Sq. Ft. Per Sq. Ft.
BASE BID: INSTALL 8” PCC COMMERCIAL DRIVE APPROACHES:
ITEM NO. CODE DESCRIPTION OF ITEMS UNIT COST (FIGURES)
44 1-60 Sq. Ft. Per Sq. Ft.
45 61-120 Sq. Ft. Per Sq. Ft.
46 121 and Greater Sq. Ft. Per Sq. Ft.
BONDS:
ITEM NO. CODE DESCRIPTION OF ITEMS UNIT TOTAL COST
47 Labor, Materials and Performance
Bonds
LS
20 20
20 25
25 25
20 C-12
CITY OF LAKE ELSINORE
CIP Project No. Z10001
TOTAL BID PRICE:
Note:
Estimated quantities are for the purpose of Bid compar ison only; payments will be made on the basis of actual measurement of Work completed, except for lump sum (LS) and final pay (F) quantities. (S) denotes a specialty item. The Bid Price shall include, but not be limited to, sales tax and all other applicable taxes and fees.
All work described on the plans and in the specifications and other incidentals necessary to complete the project shall be paid under items above. No additional payments will be allowed.
*BID MAY BE REJECTED IF TOTAL IS NOT SHOWN FOR BOTH FIGURES AND WORDS.
TOTAL BID PRICE BASED ON BID SCHEDULE TOTAL OF UNIT PRICES FOR
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
$
Total Bid Price in Numbers
$
Total Bid Price in Written Form
In case of discrepancy between the written price and the numerical price, the written price shall prevail.
1,515.00
One thousend five hundred fifteen dollars
C-13
CITY OF LAKE ELSINORE
CIP Project No. Z10001
*BID MAY BE REJECTED IF TOTAL IS NOT SHOWN FOR BOTH FIGURES AND WORDS.
The undersigned agrees to enter into and execute a contract, with necessary bonds, at the unit prices set forth herein and in case of default in executing such contract, with necessary bonds, the check or bond accompanying this bid and the money payable thereon shall be forfeited thereby to and remain the property of the City of Lake Elsinore.
The above unit prices include all work appurtenant to the various items as outlined in the Specifications and all work or expense required for the satisfactory completion of said items. In case of discrepancies between unit pricesand totals, the unit prices shall govern.
The undersigned declares that it has carefully examined the Plans, Specifications, and Contract Documents, and has investigated the site of the work and is familiar with the conditions thereon.
Contractor
Date: _______________________________ By: ___________________________________ Contractor’sState License No.:_______________________________ Class: ___________________________________________________ Department of Industrial Relations Registration No: ___________________________________ Registration Date: _________________________ Expiration Date: ______________________ Address: ____________________________________________________________________ Phone:
FAX:
tractor
_______________
_
Aneen Construction, Inc.
4.30.25 Tamer Khalil, President
1004775
A
1000033880
2015 6.30.25
9938 Magnolia Ave. Riverside, Ca 92503
909.913.3024
C-15
CITY OF LAKE ELSINORE
CIP Project No. Z10001
BOND NO.
BIDDER'S BOND
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
KNOW ALL MEN OR WOMEN BY THESE PRESENTS:
That we , as PRINCIPAL,
hereinafter referred to as "Contractor", and
a duly authorized corporate as "Surety," are held and firmly bound unto the City of Lake Elsinore in the penal sum of TEN PERCENT (10%) OF THE TOTAL AMOUNT OF THE BID of the Contractor above named, submitted by said Contractor to the City of Lake Elsinore for the work for said project entitled above, for the payment of which sum in lawful money of the United States, well and truly to be made, to the City of Lake Elsinore to which said bid was submitted, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. In no case shall the liability of the surety hereunder exceed the amount of ___________________.
THE CONDITION OF THIS OBLIGATION IS SUCH:
That whereas the Contractor has submitted the ab ove-mentioned Bid to the City of Lake Elsinore as aforesaid for the work for said project entitled above.
NOW, THEREFORE, if the aforesaid Contractor is awarded the Contract and, within the time and manner required under the Contract documents, after the prescribed forms are presented to him or her for signature, enters into a written Agreement in the prescribed form and in accordance with the Contract documents, and files tw o bonds with the City of Lake Elsi nore, one to guarantee faithful performance and the other to guar antee payment for labor and materi als, in accordance with said Contract documents, and as required by law, an d files the required insurance certificate(s) in accordance with said Contract documents, then th is obligation shall be nu ll and void; otherwise, it shall be and remain in full force and effect until execution of the Agreement or forfeiture pursuant to the Provisions of Sections 20172 and 20174 of the Public Contract Code.
In the event suit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all costs incurred by the City in such suit, including a reasonable attorney fee to be fixed by the court.
(SIGNATURE PAGE FOLLOWS)
C-16
CITY OF LAKE ELSINORE
CIP Project No. Z10001
BIDDER’S BOND SIGNATURE PAGE
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
IN WITNESS WHEREOF, we have hereunto set our hands and seals on this day of , 202__
BIDDER: CORPORATE SURETY:
Contractor Name: Company Name:
Address: Address:
Telephone No.: Telephone No.:
Print Name: Print Name:
Title: Title:
Signature: Signature:
Date: Date:
SIGNING INSTRUCTIONS TO THE CONTRACTOR
Bidder’s Bond must be accompanied by notary certificates for EACH signature. Note the description of the document on the notary certificate. Attach BOTH notary certificates immediately following this page.
Corporate Seal may be affixed hereto.
The attorney-in-fact for corporate surety must be registered, as such, in at least one county in the State of California. Attach one origin al Power of Attorney immediately following the notary certificates.
If the Bidder fails to properly sign or omits the required signatures, the bid will be considered non-responsive and will be rejected.
C-17
CITY OF LAKE ELSINORE
CIP Project No. Z10001
LIST OF SUBCONTRACTORS
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
The bidder is required to fill in the following blanks in accordance with the provisions of the Subletting and Subcontracting Fair Practices Ac t (Chapter 2 of Division 5, Title 1 of the Government Code of the State of California) and should familiarize itself with Sections 2-3 of the Standard Specifications.
Name Under Which Subcontractor is Licensed: ______________________________________ ____________________________________________________________________________ License Number: _______________________
Address of Office, Mill or Shop: ___________________________________________________ Specific Description of Sub-Contract: and Bid Items of Work:____________________________ ____________________________________________________________________________
Name Under Which Subcontractor is Licensed: ______________________________________ ____________________________________________________________________________ License Number: _______________________
Address of Office, Mill or Shop: ___________________________________________________ Specific Description of Sub-Contract: and Bid Items of Work ____________________________ ____________________________________________________________________________
Name Under Which Subcontractor is Licensed: ______________________________________ ____________________________________________________________________________ License Number: _______________________
Address of Office, Mill or Shop: ___________________________________________________ Specific Description of Sub-Contract: and Bid Items of Work:____________________________ ____________________________________________________________________________
Name Under Which Subcontractor is Licensed: ______________________________________ ____________________________________________________________________________ License Number: _______________________
Address of Office, Mill or Shop: ___________________________________________________ Specific Description of Sub-Contract: and Bid Items of Work:____________________________ ____________________________________________________________________________
Subcontractors listed in accordance with the provisions of Section 2-3 must be properly licensed under the laws of the State of California for the type of work that they are to perform. Do not list alternate subcontractors for the same work.
N/a
C-18
CITY OF LAKE ELSINORE
CIP Project No. Z10001
REFERENCES
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
Failure to demonstrate adequate experience may result in rejection of the bid.
For all public agency projects with a similar scope of work which you have worked on (or are currently working on) in the past two (2) years, provide the following required information:
1. Name (Firm/Agency) ______________ __________________________________
Address __________________________________________________________
Project Title ________________________________________________________
Project Location_____________________________________________________
Type of Work ______________________________________________________
Project Manager Contact ____________________ Phone____________________
Dated Completed _______________ Contract Amount ____________________
2. Name (Firm/Agency) ______________ __________________________________
Address __________________________________________________________
Project Title ________________________________________________________
Project Location_____________________________________________________
Type of Work ______________________________________________________
Project Manager Contact ____________________ Phone____________________
Dated Completed _______________ Contract Amount ____________________
3. Name (Firm/Agency) ______________ __________________________________
Address __________________________________________________________
Project Title ________________________________________________________
Project Location_____________________________________________________
Type of Work ______________________________________________________
Project Manager Contact ____________________ Phone____________________
Dated Completed _______________ Contract Amount ____________________ City of Lake Elsinore
130 Main St.
Downtown Sidewalk
City of Lake Elsinore
Sidewalks, Curb&gutter ADA ramps
Carlos Nornavi
2023 1.3 Million
City of Mahnattan Beach
Crosswalks Improvement project
City of Manhattan Beach
2024 1.2 Million
City of Hemet
ADA Improvement
City of Hemet
Noah Rue
2025 525
Sidewalks, Curb&gutter ADA ramps
Sidewalks, Curb&gutter ADA ramps
(310) 802-5354
(951) 765-2360
C-19
CITY OF LAKE ELSINORE
CIP Project No. Z10001
List any other projects (private, older than three (3) years, etc.) that may represent qualifying or similar experience:
4. Name (Firm/Agency) ______________ __________________________________
Address __________________________________________________________
Project Title ________________________________________________________
Project Location_____________________________________________________
Type of Work ______________________________________________________
Project Manager Contact ____________________ Phone____________________
Dated Completed _______________ Contract Amount _____________________
5. Name (Firm/Agency) ______________ __________________________________
Address __________________________________________________________
Project Title ________________________________________________________
Project Location_____________________________________________________
Type of Work ______________________________________________________
Project Manager Contact ____________________ Phone____________________
Dated Completed _______________ Contract Amount ____________________
6. Name (Firm/Agency) ______________ __________________________________
Address __________________________________________________________
Project Title ________________________________________________________
Project Location_____________________________________________________
Type of Work ______________________________________________________
Project Manager Contact ____________________ Phone____________________
Dated Completed _______________ Contract Amount ____________________ C-20
CITY OF LAKE ELSINORE
CIP Project No. Z10001
CONTRACTOR INFORMATION
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
Contractor’s License No.: ______________________ Class: _____________________
a. Date first obtained: ____________ ______________ Expiration _____________
b. Has Bidder’s License ever been suspended or revoked? ________________ If yes, describe when and why: _____________________________________________
c. Any current claims against License or Bond? _________________ If yes, describe claims: ___________________________________________________
Principals in Company (List all – attach additional sheets if necessary):
NAME TITLE LICENSE NO.
(If Applicable)
1004775 A
2015 6.30.25
no
no
Tamer Khalil President A
C-21
CITY OF LAKE ELSINORE
CIP Project No. Z10001
VIOLATIONS OF FEDERAL, STATE OR LOCAL LAWS
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
1. Has your firm or its officers been assessed any penalties by an agency for noncompliance or violations of Federal, State or Local labor laws and/or business or licensing regulations within the past five (5) years relating to your construction projects?
YES / NO (circle one)
Federal / State / Local (circle one)
If “YES,” identify and describe, (including agency and status):
Have the penalties been paid? YES / NO ( circle one)
2. Does your firm or its officers have any ongoing investigations by any public agency regarding violations of the State Labor Code, California Business and Professions Code or State Licensing Laws?
YES / NO (circle one)
Code/Laws:
Section/Article:
If “yes,” identify and describe, (including agency and status):
3. Has Bidder been “default terminated” by an owner (other than for convenience), or has Surety completed a contract for Bidder within the last five (5) years?
YES / NO (circle one)
If “yes,” please explain: _____________________________
4. Has Bidder been cited more than twice for fail ure to pay prevailing wages in the last five (5) years?
YES / NO (circle one)
If “yes,” please explain: _____________________________
Notes: Providing false information may result in criminal prosecution or administrative sanctions.
The above certification is part of the Propos al. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.
C-22
Signature Date
Print Name Title
__________________________________________________________ Contractor Name
Signature
Tamer Khalil, President
Aneen Construction, Inc.
04.30.25 C-23
CITY OF LAKE ELSINORE
CIP Project No. Z10001
DISQUALIFICATION OR DEBARMENT
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
Has your firm, any officer of your firm, or any em ployee who has a proprietary interest in your firm ever been disqualified, removed, or otherwise pr evented from bidding on, performing work on, or completing a federal, state or local project because of a violation of law or a safety regulation? YES / NO (circle one)
If yes, provide the following information (if more than once, use separate sheets):
Date: _______________ Entity:
Location:
Reason:
Provide Status and any Supplemental Statement: _____
Has your firm been reinstated by this entity?
YES / NO (circle one)
Notes: Providing false information may result in criminal prosecution or administrative sanctions.
The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.
Signature Date
Print Name Title
Contractor Name
If the Bidder fails to properly sign or omits the required signature, the bid will be considered non-responsive and will be rejected.
Signature
g
ove certification i
hereof shall also
4.30.25 Tamer Khalil, President
Aneen Construction, Inc.
C-24
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
HONORABLE MAYOR AND CITY COUNCIL
CITY OF LAKE ELSINORE, CALIFORNIA
The undersigned hereby promises and agrees that in the performance of the work specified in this contract Project No. Z10001, ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM (I) (we) (it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary, primary or transmission facilities. The term “Qualified person” is defined in Title 8, Cali fornia Administrative code, Section 2700, as follows:
Qualified Person: A person who by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved.” The undersigned also promises and agrees th at all such work shall be performed in accordance with all applicable electrical ut ility company’s requirements, Public Utility Commission orders, and State of California Cal-OSHA requirements.
The undersigned further promises and agrees th at the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or su bcontractors with the requirements contained herein.
Signature
By:
Name
Title
Contractor Name
Signatu
Tamer Khalil
President
Aneen Construction, Inc.
C-25
PUBLIC CONTRACT CODE
ANNUAL CURB, GUTTER & SIDEWALK REPAIR PROGRAM
CIP PROJECT NO. Z10001
Public Contract Code Section 10285.1 Statement
In accordance with Public Contract Code Section 10285.1 (Chapter 376, State. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has __ , has not ________ been convicte d within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defi ned in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the Ca lifornia State University. The term “bidder” is understood to include any partner, member, office r, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.
Note: The bidder must place a check mark after “has” or “has not” in one of the blank spaces provided. The above Statement is part of th e Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
Public Contract Code Section 10162 Questionnaire
In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation:
Yes No
If the answer is yes, explain the circumstances in the following space.
Public Contract Code 10232 Statement
In accordance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediate preceding two-year period because of the Contractor’s failure to comply with an order of federal c ourt which orders the Contractor to comply with an order of the National Labor Relations Board.
Note: The above Statement and Ques tionnaire are part of the Proposal . Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
Signature Date
Print Name Title
Contractor Name
tractor to comply w
ove Statement an
re portion thereof s
tioned that making
Signature
x
x
4.30.25 Tamer Khalil, President
Aneen Construction, Inc.
Tamer Khalil
President
April 30, 2025