SUBTOTAL $114,215.60
TAX @ 8.75% $3,781.37
GRAND TOTAL $117,996.97
Description of Work
*Chang Order*
Provide and install additional (240) pendant sprinkler heads to new hard lid areas; original plans show open to ceiling. About 11ft ceiling height.
Changes per Gus on 5/8/2025.
Price includes time, material, new engineered drawings to include the sprinkler additions.
NOTE: Will need the change order approved in order to move forward with installing heads.
Services to be completed
[Sprinkler] Sprinkler - Riser room Riser, x1 City Hall
Adding (240) Pendant Heads to open ceiling on hard lid per Gus.
By my signature below, I authorize work to begin and agree to pay the Grand Total.
Name: Date:
Signature:
From Rapid Fire Safety & Security
LLC
36140 Jana Lane
Wildomar CA 92595
(800) 470-3473
https://www.rapidfiress.com/
Quote No. 2017377
Type Construction
Prepared By Ethan Barajas
Created On 05/08/2025
Valid Until 06/09/2025
Quote For City of Lake Elsinore
City of Lake Elsinore - City Hall
130 South Main Street (City
Hall)
Lake Elsinore CA 92530
951.538.9493