J&M Leyva Service and Pricing Guide
Directional Drilling (Bore)
Mobilization: $1,500/day
Scope: Bore for underground utilities
Feet Range Unit Price ($/ft)
1' - 50' 100
51' - 200' 95
201' - 500' 90
501' - 1,000' 80
Concrete Work (4-inch Slab)
Mobilization: $1,500/day
Scope: Concrete slab pouring
Square Feet Range Unit Price ($/sqft)
0' - 100' 35
101' - 250' 30
251' - 500' 25
Asphalt Paving (Grind and Cap)
Mobilization: $1,500/day
Square Footage Rate ($)
Up to 500 sqft 4,750 (Daily Rate)
501 sqft and more $15
Sign Services
Service Type Rate
Monument Sign Repair $105/hour
New Monument Sign Project-Based Pricing
Other Services
Mobilization: $1,500/day
Service Rate Description
Block Wall (8 ft) $336/linear ft (1 ft) Construction with rebar and footings
Curbs and Gutters $50/linear ft (1 ft) Installation of curbs and gutters
Tile Flooring $3.5/unit Tile flooring installation
including prep and cleaning
Custom Cabinets $532/linear ft (30 ft) Cabinetry installation for office or kitchen
Dry Wall $2.52/linear ft (8-10 ft
height)
Material and cleanup
Steel Framing $112/linear ft Steel framing installation and cleanup
Wood Framing $28/linear ft (8-10 ft) Cleanup and materials included
Trenching Project-Based Pricing Excavation for utilities, foundation work, or
drainage systems,
Communications
Paint $490/sqft Painting services
Waterproof Flooring $9.1/sqft Waterproof flooring
installation
Counter Top $51.8/sqft Countertop installation
Exhibit A - Cost Proposal
Lake Elsinore City Council
June 10, 2025
- Document
- Exhibit A - Cost Proposal
- Meeting
- June 10, 2025
- Body
- Lake Elsinore City Council
- Original file
- 162 KB
Text extracted from the city's file for reading and search. Open the original on lakeelsinore.primegov.com. That file is the official record.