REPORT TO CITY COUNCIL
To:Honorable Mayor and Members of the City Council
From:Jason Simpson, City Manager
Prepared by:Remon Habib, City Engineer
Date:June 10, 2025
Subject:Fiscal Year 2025-26 SB-1 Lakeshore Drive and Mission Trail Pavement Resurfacing Project
Recommendation
Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2025-2026 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017.
Background
The new resolution will be uploaded to the “CALSMART” web tool to obtain project approval for SB-1 funding for Fiscal Year 2025-26.
Bucknam Infrastructure Group performed a Pavement Assessment in 2022, based on their pavement condition survey (2/2022), the Lakeshore Drive and Mission Trail project pavement condition indexes were rated on a scale from 0 to 100, depicting the condition of the existing pavement. Resurfacing recommendations are divided into the following categories based on the pavement condition:
•2” Grind and Overlay
•3” Grind and Overlay
SB-1 Lakeshore Dr and Mission Trail FY25/26
Discussion
The Lakeshore Drive and Mission Trail Pavement Resurfacing Project will include 2” grind and overlay and 3” grind and overlay. The following areas for the project are as follows:
Street Name From To Treatment
1 Lakeshore Drive Main St. Diamond Drive 2" AC Overlay
2 Mission Trail Diamond Dr. Malaga Rd. 2" AC Overlay
3 Malaga Rd. Mission Trail CDS 3" AC Overlay
4 Pete Lehr Dr. Diamond Dr. CDS 2" AC Overlay
5 Diamond Cir. Malaga Rd. Pete Lehr Dr. 2" AC Overlay
6 Campbell St. Mission Trail Diamond Dr. 3" AC Overlay
The estimated cost for the Lakeshore Drive and Mission Trail Pavement Resurfacing Project is $2,028,000.00. Once SB-1 funding is secured, projects from the list above will be advertised for bid. The City of Lake Elsinore’s projected SB-1 allocation for FY 2025-2026 is $1,935,163.00.
Fiscal Impact
The funding allocation for the Fiscal Year 2025-26 Lakeshore Drive and Mission Trail Pavement Resurfacing Project will be from the allocated SB-1 funds available with the remainder being funded from Measure A funds.
Attachments
Attachment 1 - Resolution
Attachment 2 - Project Map