STOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOP
STOPSTOPSTOPSTOPSTOPSTOPSTOPSTOP
STOP
STOP
STOP
MASTERSITE PLAN A-111
11/30/25DATE SIGNED: 02/12/25
SHEET TITLE
NO.
c COPYRIGHT 2024, UPWARD ARCHITECTSTHESE DRAWINGS ARE THE INSTRUMENTS OF SERVICE AND ARE THEPROPERTY OF UPWARD ARCHITECTS, UPWARD ARCHITECTS EXPRESSLYRESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS TOTHESE PLANS. THESE PLANS ARE NOT TO BE REPRODUCED, CHANGED ORCOPIED IN ANY FORM OR MANNER WHATSOEVER, NOR ARE THEY TO BEASSIGNED TO ANY THIRD PARTY, WITHOUT FIRST OBTAINING THE EXPRESSEDWRITTEN PERMISSION AND CONSENT OF UPWARD ARCHITECTS. WRITTENDIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALEDDIMENSIONS.
CONSULTANT
PROJECT NUMBER
LEGAL NOTES::
S:\2024\24065 - EVERGREEN-CAMBERN AND CENTRAL, LAKE ELSINORE\02. CD\24065-A-111 MASTER SITE PLAN.DWGPrinted by: ---- 2/10/2025 11:39 AM 1155 W. Rio Salado Parkway, Suite B-101Tempe, AZ 85281Ph 602.753.5222 www.upwardarchitects.com
REVISIONS
ARCHITECT
DATEISSUE
SEAL
OWNERPROJECT DESCRIPTION
DATE:19
24065.00SITE IMPROVEMENTSNEC OF CAMBERN AVE. & CENTRAL AVE LAKE ELSINORE, CA 92532 02/12/25TENANT/OWNER COMMENTS
00.00.00 N SCALE:MASTER SITE PLAN 1" = 40'-0"1