City of Lake Elsinore – Curb Ramp Design (PS&E) Page 1
00024023 – Amendment No.1
5095 Murphy Canyon Road, Suite 330, San Diego, CA 92123 T: (619) 683-2933 | F: (619) 683-7982 | www.koacorp.com

MONTEREY PARK ORANGE ONTARIO SAN DIEGO

June 12, 2025

Yu Tagai, PE
Assistant City Engineer
City of Lake Elsinore
951-674-3124 (x246)

Subject: HSIP Cycle 11 Application (08 – Lake Elsinore-2) - Rectangular Rapid Flashing Beacon (RRFB) Crossings at 9 Locations - Project Plans, Specification, and Cost Estimates (PS&E) (00024023) Amendment No.1 – Curb Ramps Design (PS&E)

Dear Mr. Tagai:

Thank you for requesting KOA Corporation (KOA) to provide this fee proposal for PS&E preparation of upgradation of 23 ADA curb ramps at 9 locations. See Attachment A for the locations. The scope of work and fee estimate are as follows.

SCOPE OF WORK
TASK 1 – PROJECT MANAGEMENT
This task will include the following items:
 Host one virtual kick-off meeting with the City; prepare and circulate agenda, action items and meeting minutes for the kick-off meeting.
 Host up to 2 design submittal meetings with the City staff to resolve any project issues. Excludes preparation of agenda, meeting minutes, and action items.
 Prepare monthly invoices with their respective progress reports.  Conduct internal meetings as needed to resolve any project issues

Deliverables:
 Host one (1) Kick-off meeting; prepare and circulate meeting minutes, agenda, and action items for one Kick-off meeting (electronic copies).
 Host up to two (2) design submittal meetings with the City staff to resolve any project issues. Preparation of meeting minutes, agendas and action items is excluded.
 Monthly invoices with progress reports (electronic copies).

TASK 2 – PRELIMINARY ENGINEERING
This task will include the following items:

Topographic Survey – KDM Meridian, Inc. under contract to KOA will perform topographic survey at the 31 locations.

 Topographic Survey at Each Ramp Location: We will survey each curb ramp, capturing full topography of the curb return—from beginning of curb return (BCR) to end of curb return (ECR) and extending 5 feet into the adjacent street and 5 feet behind the back of walk, except where obstructed by walls or other physical impediments.  Monumentation and Ties: Existing centerline monumentation and any ties observed in curb or sidewalk will be located and shown in the drawings. However, the scope does not include research or formal generation of centerline or right-of-way (ROW) information.
 Georeferencing and Datum: Surveys will be georeferenced to California State Plane coordinates and tied to a consistent NAVD88 vertical datum, with local control points (either found or set) included in the deliverables.

City of Lake Elsinore – Curb Ramp Design (PS&E) Page 2
00024023 – Amendment No.1
Deliverables:
 AutoCAD drawings for each ramp location will be provided, drafted at 1” = 10’ scale, showing existing conditions and accurate grade information. Each drawing will include a digital terrain model (DTM).

Field Review & Site Evaluation – Upon receipt of the topographic survey from KDM Meridian, Inc., we will visit the project site up to two (2) times to verify the existing conditions of 31 curb ramps for ADA compliance. We will document our field review with field notes and photos at each of the 31 curb ramps.

Deliverable:
 Field notes & pictures of 31 curb ramps

Base Map Preparation – KOA will prepare a base map using the topographic survey information obtained from KDM Meridian, Inc. This base map will be used as a reference for the final design plans.

Deliverables:
 Base Map (to be referenced on the plan sheets)

TASK 3 – FINAL DESIGN
This task will include evaluating 31 Curb Ramps at the 9 RRFB locations. Based on our preliminary review, 23 cub ramps out of 31 will need to be upgraded to be ADA compliant. This task will include the following:

 Plans Preparation (total of 6 plan sheets; 4 curb ramp details per sheet) o ADA Curb Ramp Details (Scale: 1” = 5’) – (6)

 Technical Specifications Preparation
o KOA will prepare the technical specifications using the City boilerplate, Standard Specifications for Public Works Construction (SSPWC) and Caltrans Standard Specifications.

 Cost Estimates
o Cost Estimates will be prepared based on available sources such as recent City bid projects, bid prices from other local projects and Caltrans published data (if applicable).

Deliverables:
 One electronic submittal of Plans, Specifications, & Estimates at 90%, 100% (Final).  One round of comments at 90% will be addressed.
 The 100% (final) submittal addressing comments on 90% will be submitted for final approval. The final design will be referenced/reflected into the RRFB Plans.

TASK 4 – CONSTRUCTION SUPPORT
This task will include the following items:
 Bid & Construction Support
o Review of shop drawings, submittals, and change orders. o Responses to Requests for Information (RFIs).
o Minor design changes during construction.
 Record Drawings/As-Built Plans

City of Lake Elsinore – Curb Ramps Design (PS&E) Page 3 00024023 – Amendment No.1
o Upon completion of construction, KOA will prepare record drawings based on redlines provided by the Contractor and/or the Client’s Construction Manager. As-builts will be submitted as pdf and electronic files as requested by the Client.

Deliverables:
 RFI responses.
 Applicable design revisions.
 Record drawings/As-built plans.

Note: Budget is limited to what is shown in the fee schedule. An amendment will be prepared if construction support goes beyond the allocated budget shown in the fee schedule.

SCOPE OF WORK ASSUMPTIONS & EXCLUSIONS
Our proposal was developed on the following understanding of the project.  All submittals will be made electronically.
 Additional signage and striping which includes upgrading school zone signage in the vicinity or any “reduced speed school zone ahead” signage is excluded.
 Utility potholing is excluded from the scope of work.  Utility relocation coordination with the Utility owners is excluded. The City will be solely responsible for coordinating utility relocation with the utility owners.  Any unforeseen scope of work items not described above will be considered as additional work and will be discussed with the City.
 Any significant changes on the scope will be treated as additional work and a new scope of work and fee will be negotiated with the City.
 Field verification of proposed improvements is excluded from our scope of work.  During our field reviews, we will assess the curb ramps’ grades and determine the need for transition panels. If we determine that mentioning a Caltrans/City Case Type for curb ramps is adequate for the contractor to build with a standard detail, then we will call out Case Type only in lieu of providing a detailed design. If a truncated dome and/ or zero lip will be adequate, then we will specify it, if all else is compliant.

SCHEDULE
We anticipate approximately 6-month duration (June 25, 2025, through November 21, 2025) to complete the above- mentioned scope of work items. This is on the basis that the City will adhere to the said review milestones.

 Notice To Proceed – June 25, 2025
 90% submittal – Plans, Specifications, & Estimate – September 26, 2025  Review comments (one round only) due from the City – October 24, 2025  100% (Final) submittal Plans, Specifications, & Estimate – November 21, 2025

FEE ESTIMATE
KOA Corporation will perform the above specified scope of work at a lump sum fee of $125,048.50. The proposal is valid for 30 days and any individual tasks that are not authorized within 30 days of the date of this proposal are also subject to fee adjustments.

City of Lake Elsinore – Curb Ramp Design (PS&E) Page 4
00024023 – Amendment No.1

AUTHORIZATION
An amendment to the professional service agreement shall be prepared and executed prior to work.

Sincerely,
KOA | A Lochner Company

Giuseppe Canzonieri, PE
Principal | Director of Engineering

ATTACHMENT – A

CITY OF LAKE ELSINOREEXHIBIT - CURB RAMP LOCATIONS
#1
#3 #7 #9#2 #4
#5,#6
#8
LEGEND :
-2---21-3
3-444134-
TOTALCURB RAMPS324443444

NON-ADACOMPLIANTADACOMPLIANT
TOTAL8 2331
CROSSSTREETSLOCATION# 1 Machado Street at Broadway Street 2 Joy Street at Machado Elementary 3 Heald Avenue at Mohr Street 4 Heald Avenue at Lewis Street 5 Sumner Avenue at Kellogg Street 6 Sumner Avenue at Poe Street 7 Mill Street at Avenue 9 8 Ponte Russo at Ponte Verde 9 Kalanchoe Road at Waxen Drive Project Locations

CURB RAMP SUMMARY
PROJECT NO. Z10105
MACHADO STREET AT BROADWAY STREET2
CROSSWALK DETAILDETAIL B:

CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARK APPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLE REMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025
A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 YIELD LINE DETAILDETAIL C:

Know what'sbelow.Callbefore you dig.

MACHADO STREET (40 MPH)
2349101112
16B18
1 15
19C
19D
22 MONTEREYSTREET(25 MPH)
BROADWAYSTREET(25 MPH)
PUSHBUTTON TOTURN ONWARNINGLIGHTSCALTRANSES-5ETRENCH IN PAVEMENTDETAIL DETAIL F:SOUTH CROSSINGRRFB DETAIL
DETAIL A:NORTH CROSSINGRRFB DETAIL

JOY STREET AT MACHADO ELEMENTARY3CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARKAPPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLEREMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 YIELD LINE DETAILDETAIL C:

MACHADO ELEMENTARY SCHOOL
JOY STREET (25 MPH)
Know what'sbelow.Callbefore you dig.
12341011
181716A1412
16C
19A

PUSHBUTTON TOTURN ONWARNINGLIGHTS
DETAIL F:MARKER DETAILTYPE DCROSSWALK DETAILDETAIL B:

DETAIL A:RRFB DETAIL

HEALD AVENUE AT MOHR STREET4CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARKAPPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLEREMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 MOHRSTREET(25 MPH)
W. HEALD AVENUE (25 MPH)MOHRSTREET(25 MPH)
W. HEALD AVENUE (25 MPH)
YIELD LINE DETAILDETAIL C:

Know what'sbelow.Callbefore you dig.
123
10111819B
7912
4 CROSSWALK DETAILDETAIL B:

PUSHBUTTON TOTURN ONWARNINGLIGHTS
DETAIL D:RRFB DETAIL

HEALD AVENUE AT LEWIS STREET5CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARKAPPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLEREMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 LEWISSTREET N.(25 MPH)
LEWISSTREET N.(25 MPH)
W. HEALD AVENUE (25 MPH)W. HEALD AVENUE (25 MPH)
YIELD LINE DETAILDETAIL C:

Know what'sbelow.Callbefore you dig.
1234
101118
912
87 19A

PUSHBUTTON TOTURN ONWARNINGLIGHTS
CROSSWALK DETAILDETAIL B:

DETAIL A:RRFB DETAIL

SUMNER AVENUE AT KELLOG STREET6CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARKAPPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLEREMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 123
10111897
19B
4A4B
W. SUMNER AVENUE (25 MPH)W. SUMNER AVENUE (25 MPH)
YIELD LINE DETAILDETAIL C:

Know what'sbelow.Callbefore you dig.

N. KELLOGSTREET(25 MPH)
N. KELLOGSTREET(25 MPH)

PUSHBUTTON TOTURN ONWARNINGLIGHTS
CROSSWALK DETAILDETAIL B:

DETAIL D:RRFB DETAIL

SUMNER AVENUE AT POE STREET7
W. SUMNER AVENUE (25 MPH)
CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARKAPPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLEREMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 234
1011
1816A
4B912
19A
YIELD LINE DETAILDETAIL C:

Know what'sbelow.Callbefore you dig.

N. POESTREET(25 MPH)W. SUMNER AVENUE (25 MPH)

PUSHBUTTON TOTURN ONWARNINGLIGHTS
CROSSWALK DETAILDETAIL B:

DETAIL A:RRFB DETAIL

MILL STREET AT AVENUE 98CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARKAPPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLEREMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 23 10111817
2019B
9 1
4A4
MILL STREET (25 MPH)AVENUE 10(25 MPH)AVENUE 9(25 MPH)
MILL STREET (15 MPH)
YIELD LINE DETAILDETAIL C:

Know what'sbelow.Callbefore you dig.

AVENUE 9(25 MPH)

PUSHBUTTON TOTURN ONWARNINGLIGHTS
DETAIL E:RRFB DETAIL
*
* CROSSWALK DETAILDETAIL B:

DETAIL D:RRFB DETAIL

PONTE RUSSO AT PONTE VERDE9CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARKAPPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLEREMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 1234910111821
1312
7A7B
19A
PONTEVERDE(25 MPH)
PONTE RUSSO (25 MPH)
PONTESONATA(25 MPH)
YIELD LINE DETAILDETAIL C:

Know what'sbelow.Callbefore you dig.

PUSHBUTTON TOTURN ONWARNINGLIGHTS
CROSSWALK DETAILDETAIL B:

DETAIL A:RRFB DETAIL

KALANCHOE ROAD AT WAXEN DRIVE10CITY OF LAKE ELSINOREOFFILE NO.REVISIONS HSIP CYCLE 11 CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTSBENCHMARK PLAN PREPARED UNDER SUPERVISION OF:10MARKAPPRO.DATETHESE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THEAPPROPRIATE CONDITIONS OF DEVELOPMENT AND/OR CITY AND STATE LAWSAND HAVE BEEN FOUND ACCEPTABLEREMON HABIB, RCE No. 83156CITY ENGINEERCITY OF LAKE ELSINOREDATE SHEETSHEETS4/3/2025A LOCHNER COMPANY 0002402395% SUBMITTALNOT FORCONSTRUCTIONOntario, California 917612855 East Guasti Road, Suite 410Tel: (909) 890-9693 Fax: (909) 890-9694 31116B17
2101219A
WAXENDRIVE(25 MPH)
KALANCHOE ROAD (25 MPH)
Know what'sbelow.Callbefore you dig.

PUSHBUTTON TOTURN ONWARNINGLIGHTS
YIELD LINE DETAILDETAIL C:CROSSWALK DETAILDETAIL B:

DETAIL A:RRFB DETAIL

← All documents from this meeting