Attachment 2 - Inspection Check Initial Funds Calculation

Lake Elsinore City Council
July 8, 2025

Document
Attachment 2 - Inspection Check Initial Funds Calculation
Meeting
July 8, 2025
Body
Lake Elsinore City Council
Original file
86 KB
Text extracted from the city's file for reading and search. Open the original on lakeelsinore.primegov.com. That file is the official record.

Application No:

Project Name:

QUANTITY UNIT ITEM UNIT COST COST
EA Reports/Studies $5,000 -$
Planning Subtotal -$

QUANTITY UNIT ITEM UNIT COST COST
LF 8" PVC Water Main 50.00$ -$ LF 12" DIP Water Main 65.00$ -$ EA 4" RW Gate Valve 1,800.00$ -$ EA 6" RW Gate Valve 2,000.00$ -$ EA 8" RW Gate Valve 2,200.00$ -$ EA 12" RW Gate Valve 3,000.00$ -$ EA Fire Hydrant (6") Super 6,500.00$ -$ EA Fire Hydrant (6") Standard/Blow-Off 5,500.00$ -$ EA 1" Water Service 1,100.00$ -$ EA 2" Water Service 3,000.00$ -$ EA 1" Air/Vac Assembly 2,500.00$ -$ EA 2" Air/Vac Assembly 4,000.00$ -$ EA Fire Double Check Detector Assmbly 10,000.00$ -$ Water Pipeline Subtotal -$

QUANTITY UNIT ITEM UNIT COST COST
1248 LF 8" Sewer Main 35.00$ 43,680.00$ LF 10" Sewer Main 45.00$ -$ LF 12" Sewer Main 50.00$ -$ LF 6" PVC Sewer Force Main 80.00$ -$ LF 8" PVC Sewer Force Main 120.00$ -$ LF 12" PVC Sewer Force Main 140.00$ -$ 6 EA 5' Manhole Depth 6,500.00$ 39,000.00$ Sewer Pipeline Subtotal 82,680.00$

QUANTITY UNIT ITEM UNIT COST COST
1 LS Complex Facility Description: -$
Complex Facility Subtotal -$
82,680.00$
16,536.00$
99,216.00$
14,882.40$
14,882.40$
-$
1,488.24$
Additional Inspection Deposit Required, Calculated from Contractor's Schedule 13,529.36$ 29,900.00$
Attach an engineer cost estimate prepared by the Registered Civil Engineer for the complex facility. Provide the lump sum amount below.

Inspection Check Initial Funds Calculation
2024-00402-INS
City of Lake Elsinore Camino del Norte Sewer Extension Project Planning (Water Analysis, Sewer Analysis, Preliminary Design Report, and Other Studies) A minimum $7,000 deposit is required
Water Pipeline
Sewer Pipeline
Complex Facilities (Booster Station, Lift Station, Reservoir, Tranmission Main (>12"), Trunk Sewer Main (>12"), and Other)
Initial Deposit Submitted
Additional Initial Deposit Required
Sub-Total Engineers Cost Estimate
Contingency (20%)
Total Engineers Cost Estimate
15% of Engineers Cost Estimate
Total Inspection Check Deposit Required
Mapping Fee Required
Printed: 3/4/2025