Final Engineer’s Report
Fiscal Year 2025-26
Landscape and Street Lighting
Maintenance District No. 1
Table of Contents
City of Lake Elsinore
Engineer’s Report LMD 1
Fiscal Year 2025-26
Sections
i. Introduction i
1. Plans and Specifications 1
2. Cost Estimates 4
3. Method of Apportionment of Assessment 16
4. Assessment Rolls 28
5. District Diagram 29
Tables
Table 2-1 Zone 1 Budget 4
Table 2-2 Zone 2 Budget 5
Table 2-3 Zone 3 Budget 5
Table 2-4 Zone 4 Budget 6
Table 2-5 Zone 5 Budget 6
Table 2-6 Zone 6 Budget 7
Table 2-7 Zone 7 Budget 7
Table 2-8 Zone 8 Budget 8
Table 2-9 Zone 9 Budget 8
Table 2-10 Zone 11 Budget 9
Table 2-11 Zone 14 Budget 9
Table 2-12 Zone 15 Budget 10
Table 2-13 Zone 16 Budget 10
Table 2-14 Zone 17 Budget 11
Table 2-15 Zone 18 Budget 11
Table 2-16 Zone 19 Budget 12
Table 2-17 Zone 20 Budget 12
Table 2-18 Zone 21 Budget 13
Table 2-19 Zone 22 Budget 13
Table of Contents
City of Lake Elsinore
Engineer’s Report LMD 1
Fiscal Year 2025-26
Table 2-20 Zone 23 Budget 14
Table 2-21 Zone 24 Budget 14
Table 2-22 Zone 25 Budget 15
Table 3-1 Zone 1 Assessment Summary 18
Table 3-2 Zone 2 Assessment Summary 18
Table 3-3 Zone 3 Assessment Summary 18
Table 3-4 Zone 4 Assessment Summary 19
Table 3-5 Zone 5 Assessment Summary 19
Table 3-6 Zone 6 Assessment Summary 19
Table 3-7 Zone 7 Assessment Summary 20
Table 3-8 Zone 8 Assessment Summary 20
Table 3-9 Zone 9 Assessment Summary 20
Table 3-10 Zone 11 Assessment Summary 20
Table 3-11 Zone 14 Assessment Summary 21
Table 3-12 Zone 15 Assessment Summary 21
Table 3-13 Zone 16 Assessment Summary 21
Table 3-14 Zone 17 Assessment Summary 21
Table 3-15 Zone 18 Assessment Summary 22
Table 3-16 Zone 19 Assessment Summary 22
Table 3-17 Zone 20 Assessment Summary 22
Table 3-18 Zone 21 Assessment Summary 22
Table 3-19 Zone 22 Assessment Summary 23
Table 3-20 Zone 23 Assessment Summary 23
Table 3-21 Zone 24 Assessment Summary 23
Table 3-22 Zone 25 Assessment Summary 23
Table 3-23 Summary of Assessments 24
Table 3-24 Summary of Assessments by Zone 24
Table 3-25 Proposed Assessments 25
Table of Contents
City of Lake Elsinore
Engineer’s Report LMD 1
Fiscal Year 2025-26
Appendices
Appendix A – Assessment Rolls
Appendix B – District Diagram
i. Introduction Page | i
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
AGENCY: CITY OF LAKE ELSINORE
PROJECT: LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT NO. 1 TO: CITY COUNCIL
CITY OF LAKE ELSINORE
STATE OF CALIFORNIA
REPORT PURSUANT TO "LANDSCAPING AND LIGHTING ACT OF 1972" Pursuant to direction from the City Council (the “City Council”) of the City of Lake Elsinore (the “City”), State of California, submitted herewith is the Engineer’s Report for Landscaping and Street Lighting Maintenance District No. 1 (the “Report”), consisting of the following parts, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways Code of the State of Californi a, being the "Landscaping and Lighting Act of 1972", as amended, commencing with Section 22500, and which is in acc ordance with Resolution No. 2025-013 adopted by the City of Lake Elsinore City Council, Riverside County, California ordering preparation of the Report for Landscaping and Street Lighting Maintenance District No. 1 (“LMD No. 1” or the “District”). This Report is applicable for the ensuing 12- month period, being the Fiscal Year commencing July 1, 2025, to June 30, 2026.
Section 1 PLANS AND SPECIFICATIONS describes the improvements within the District. Plans and specifications for the improvements showing and describing the general nature, location and extent of the improvements are incorporated herein by reference and are on file in the office of the Public Works Department.
Section 2 COST ESTIMATES of the proposed improvements, including incidental costs and expenses in connection therewith.
Section 3 A METHOD OF APPO RTIONMENT OF ASSESSMENT contains the method of apportionment of assessments, indicating the proposed assessment of the total amount of the costs and expenses of the improvements upon the several lots and parcels of land within the District, in proportion to the estimated benefits to be received by such lots and parcels.
Section 4 The ASSESSMENT ROLLS contain lists of Riverside County Assessor Parcel Numbers, and the net amount to be assessed upon the benefited lands within t he District for Fiscal Year 20 25-26. The Assessment Rolls are filed in the office of the City of Lake Elsinore City Clerk and are incorporated in this Engineer’s Report by reference.
Section 5 DISTRICT DIAGRAM incorporates by reference a diagram of the District showing the exterior boundaries of the District, the boundaries of any zones within the District and the lines and dimensions of each lot or parcel of land within the District.
i. Introduction Page | ii
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Background
The City Council of the City of Lake Elsinore approved the formation of Landscaping & Street Lighting Maintenance District No . 1 in 2003. The District was formed pursuant to the requirements of the Landscaping and Lighting Act of 1972.
The District was formed to provide a source of funds for the operation, servicing, maintenance and repair of landscaping, street lighting, public park and recreation facilities, and appurtenant facilities within the District. The Report sets forth the methodology to be used in apportioning the assessment to the different land use types and benefit zones within the City based upon the benefit they receive.
The original District was formed in 2003, then several “benefit zones” were annexed into the District in the following years. These benefit zones were established to ensure a source of funds for the ongoing maintenance of street lighting improvements and pu blic landscaping which are of local benefit to the parcels within the benefit zone. Currently there are twenty -five (25) Zones of Benefit that have been annexed into the District (see Appendix B – District Diagram).
Parcels within these special benefit zones are assessed their proportionate share of the cost for the maintenance of local improvements including, but not limited to, street lighting, landscaping, public park and recreation facilities. These improv ements provide a special benefit to those parcels due to their nature and location.
Current Annual Administration
As required by the Act, the Report includes: (1) a description of the improvements to be operated, maintained , and serviced by the District, (2) an estimated budget for the District, and (3) a listing of the proposed Fiscal Year 20 25-26 assessments to be levied upon each assessable lot or parcel within the District.
The City of Lake Elsinore will hold a Public Hearing on July 8, 2025 , regarding the District which will provide an opportunity for any interested person to be heard. At the conclusion of the Public Hearing, the City Council may adopt a resolution confirming th e assessment rates as originally proposed or as modified.
Payment of these annual assessments for each parcel will be made in the same manner and at the same time as payments are made for their annual property taxes. All funds collected through the assessments must be placed in a special fund and can only be used for the purposes stated within this Report.
1. Plans and Specifications Page | 1
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Description of Improvements
The improvements which can be operated, maintained , and serviced by the District consist of landscaping, street lighting, public park and recreation facilities, and appurtenant facilities including, but not limited to, personnel, electrical energy, utilities (e.g. water), materials, contractual services, and other items necessary for the facilities described below.
Landscaping facilities include, but are not limited to, landscaping, planting, shrubbery, trees, turf, irrigation systems, hardscapes, fixtures, trails, and appurtenant facilities, in public rights -of-way, parkways, slopes, and dedicated easements within the boundaries of the District.
Street lights and appurtenant facilities include, but are not limited to, poles, fixtures, bulbs, conduits, equipment includi ng guys, anchors, posts, pedestals, and metering devices, as required to provide safe lighting within the boundaries of the District.
Public park and recreational facilities include, but are not limited to, landscaping, irrigation systems, hardscapes, sidewal ks, trails, fixtures, and appurtenant facilities including, but not limited to: lights, playground equipment, play courts, public restrooms, sports fields, parkways, designated easements within the boundaries of these parks, and buildings or structures used for the support of recr eational programs.
Maintenance for landscaping means : the furnishing of services and materials for the ordinary and usual maintenance, operation, and servicing of the landscaping and appurtenant facilities including repair, removal, or replacement of all or part of any of th e landscaping or appurtenant facilities; providing for the life, growth, health, and beauty of the landscaping including cultivation, irrig ation, trimming, spraying, fertilizing, and treating for disease or injury; the removal of trimmings, rubbish, debris, and other solid waste; and the cleaning, sandblasting, and painting of walls and other improvements to remove or cover graffiti. Maintenance for street ligh ts means the furnishing of services and materials for the ordinary and usual maintenance, operation , and servicing of the street lights and appurtenant facilities including repair, removal, or replacement of all or part of any of the street lights or appurtenant facilities.
Servicing means the furnishing of water for the irrigation of the landscaping, the maintenance of any of the lighting or appurtenant facilities, and the furnishing of electric current or energy, gas, or other illuminating agent for the lighting facilities or for the lighting or operation of the landscaping or appurtenant facilities.
The plans and specifications for the improvements, showing and describing the general nature, location, and the extent of the improvements, are on file in the office of the Director of Public Works and are incorporated herein by reference.
In order to accurately distribute the cost of the improvements maintained to the benefiting parcels, Zones of Benefit have been created throughout the City. The types of facilities to be maintained within each zone are described as follows:
Zone 1 (Original District) encompasses the Water Ridge Development and funds landscaping and street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include approximately 10,039 square feet of landscaping and 49 street lights.
Zone 2 (Annexation No. 1) encompasses the Elsinore Homes Development and funds landscaping and street lighting maintenance and operations. The facilities within the public right -of-way that are to be maintained and serviced include approximately 5,850 square feet of landscaping and 16 street lights.
Zone 3 (Annexation No. 2) encompasses the Pepper Grove Development and funds landscaping and street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include approximately 22,560 square feet of landscaping and 4 street lights.
Zone 4 (Annexation No. 3) encompasses the Serenity Development and funds landscap ing, street lighting, and park maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include approximately 630 square feet of landscaping and 63 street lights. In addition, there is approximately 9.52 acres of neighborhood park landscaping.
Zone 5 (Annexation No. 4) encompasses the Rosetta Canyon Development and funds street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include 263 street lights.
Zone 6 (Annexation No. 5) encompasses the La Laguna Phase 3 Development and funds street lighting maintenance and operations.
The facilities within the public right-of-way that are to be maintained and serviced include 28 street lights.
Zone 7 (Annexation No. 6) encompasses Tract 28214 of the Alberhill Ranch Development and funds street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include 244 street lights.
1. Plans and Specifications Page | 2
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Zone 8 (Annexation No. 7) encompasses Tract 32670 of the Belcaro Development and funds landscap ing maintenance and operations. The facilities within the public right -of-way that are to be maintained and serviced include approximately 1,080 square feet of landscaping.
Zone 9 (Annexation No. 8) encompasses Tract 32077 of the La Strada Development and funds street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include 36 street lights.
Zone 10 (Annexation No. 9) encompasses Tracts 30698 and 32129 of the Clurman -owned development and funds street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include 38 street lights.
Beginning Fiscal Year 2022 -23, the maintenance responsibility for these services are now included within Community Facilities District No. 2015-2 Zone 11.
Zone 11 (Annexation No. 10) encompasses Tract 31920 -1 of the Summerly Development and funds park landscaping and street lighting maintenance and operations. The facilities within the public right -of-way that are to be maintained and serviced include approximately 4.77 acres of landscaping and 464 street lights.
Zone 12 (Annexation No. 11) encompasses Tract 31957 of the Running Deer Estates development and funds landscaping and street lighting maintenance and operations. The facilities within the public right -of-way that are to be maintained and serviced include approximately 116,531 square feet of landscaping and 24 street lights. Beginning Fiscal Year 2022 -23, the maintenance responsibility for these services are now included within Community Facilities District No. 2006-8 Services.
Zone 13 (Annexation No. 12 ) encompasses Tract 33370 of the Tessera Development and funds landscaping and street lighting maintenance and operations. The facilities within the public right - of-way that are to be maintained and serviced include approximately 13,100 square feet of landscaping and 7 street lights. Beginning Fiscal Year 2022 -23, the maintenance responsibility for these services are now included within Community Facilities District No. 2015-2 Zone 12.
Zone 14 (Annexation No. 13) encompasses Tract 31792 of the Wasson Canyon Development and funds street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include 46 street lights.
Zone 15 (Annexation No. 14) encompasses Tract 34231 of the Trieste Development and funds landscaping maintenance and operations. The facilities within the public right- of-way that are to be maintained and serviced include approximately 25,079 square feet of landscaping (along Ardenwood Way).
Zone 16 (Annexation No. 15) encompasses the Ridgestone Apartments Development and funds landscap ing maintenance and operations. The facilities within the public right -of-way that are to be maintained and serviced include approximately 1,100 square feet of landscaping (along Ardenwood Way), and future maintenance of 10,850 square feet of landscaping along Highway 74 (if maintenance is taken over by the City).
Zone 17 (Annexation No. 16) encompasses Tract 32503 of the Rosetta Canyon Development and funds street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include 15 street lights.
Zone 18 (Annexation No. 17) encompasses Tract 32337 -1 of the La Laguna Phases 4 & 5 Development and funds street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include 36 street lights.
Zone 19 (Annexation No. 17) encompasses Tract 32337 -2 of the La Laguna Phases 4 & 5 Development and funds street lighting maintenance and operations. The facilities within the public right-of-way that are to be maintained and serviced include 16 street lights.
Zone 20 (Annexation No. 18) encompasses Tract 17413 -4 of the Tuscany Hills Estates Development and funds landscap ing maintenance and operations. The facilities within the public right-of-way (Via De La Valle, Via Del Lago and Via De La Luna) that are to be maintained and serviced include landscaping and a decomposed granite trail.
Zone 21 (Annexation No. 19) encompasses Tract 33486 of the Makenna Court Development and funds landscaping and street lighting maintenance and operations. The facilities within the public right -of-way that are to be maintained and serviced include approximately 9,800 square feet of landscaping and 22 street lights.
Zone 22 (Annexation No. 20) encompasses the California Business Condos Development and funds landscap ing maintenance and operations. The facilities within the public right -of-way that are to be maintained and serviced include approximately 4,150 square feet of landscaping (along Minthorn street), and future maintenance of 3,900 square feet of landscaping along Silver Street.
1. Plans and Specifications Page | 3
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Zone 23 (Annexation No. 21) encompasses the Diamond Professional Plaza Development and funds landscap ing maintenance and operations. The facilities within the public right -of-way that are to be maintained and serviced include approximately 7,500 square feet of landscaping along Diamond Drive.
Zone 24 (Annexation No. 22) encompasses Tract 32337 of the La Laguna Development and funds street lighting maintenance and operations. The facilities within the public right of way that are to be maintained and serviced include 19 street lights.
Zone 25 (Annexation No. 23) encompasses parcel number 377 -090-042 and funds street lighting maintenance and operations. The facilities within the public right of way that are to be maintained and serviced include 4 street lights located on Crane Str eet and Dexter Avenue.
2. Cost Estimates Page | 4
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
The Act requires that a special fund be set up for the collection of revenues and expenditures within the District. It also provides that the total cost of construction, operation, and maintenance and servicing of the public street lighting and landscaping facili ties, etc. can be recovered by the District. Incidental expenses including administration of the District, engineering fees, legal fees, and all other costs associated with the construction, operation, and maintenance and servicing of the District can also be included.
Revenues collected from the assessments shall be used only for the expenditures represented above. A contribution to the Dist rict by the City of Lake Elsinore may be made to reduce assessments, as the City Council deems appropriate. Any balance remaining on July 1 at the end of the Fiscal Year must be carried over to the next Fiscal Year.
The estimated cost of the operation, maintenance and servicing of the landscaping and street light improvements for Fiscal Year 20 25- 26, as described in Section 1 Plans and Specifications, are summarized herein and described in the tables below. The below costs are rounded to the nearest whole dollar.
Table 2-1
Zone 1 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $6,894 $7,032
Street Lighting Operations & Maintenance $12,626 $12,878 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Debt Service Replacement1 $5,209 $5,209
Total Direct Costs $24,729 $25,119
Indirect Costs
Administration Costs $991 $1,011
Assessment Engineer $701 $722
Capital Improvement Reserves $0 $0
Total Indirect Costs $1,692 $1,733
Total Costs $26,421 $26,852
Total Assessment $19,543 $19,934
Surplus / (Deficit) ($6,878) ($6,919)
1 The City purchased streetlight poles from SCE and the estimated costs for debt service contribution and acquisitions costs is reflected in the debt service payment for that zone.
2. Cost Estimates Page | 5
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-2
Zone 2 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $4,018 $4,098
Street Lighting Operations & Maintenance $4,045 $4,126 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Debt Service Replacement1 $1,773 $1,773
Total Direct Costs $9,837 $9,998
Indirect Costs
Administration Costs $1,931 $1,970
Assessment Engineer $420 $432
Capital Improvement Reserves $0 $0
Total Indirect Costs $2,351 $2,402
Total Costs $12,188 $12,400
Total Assessment $11,705 $11,939
Surplus / (Deficit) ($483) ($461)
Table 2-3
Zone 3 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $15,190 $15,494
Street Lighting Operations & Maintenance $863 $880
Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Debt Service Replacement1 $554 $554
Total Direct Costs $16,607 $16,928
Indirect Costs
Administration Costs $1,932 $1,971
Assessment Engineer $681 $701
Capital Improvement Reserves $0 $0
Total Indirect Costs $2,613 $2,672
Total Costs $19,220 $19,600
Total Assessment $18,978 $19,357
Surplus / (Deficit) ($242) ($243)
1 The City purchased streetlight poles from SCE and the estimated costs for debt service contribution and acquisitions costs is reflected in the debt service payment for that zone.
2. Cost Estimates Page | 6
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-4
Zone 4 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $564 $575
Street Lighting Operations & Maintenance $21,750 $22,185 Park Landscaping Operations & Maintenance $37,183 $37,926 Capital Replacement - Parks $10,037 $10,238
Debt Service Replacement1 $6,539 $6,539
Total Direct Costs $76,073 $77,463
Indirect Costs
Administration Costs $1,932 $1,971
Assessment Engineer $2,494 $2,569
Transfer to Operating Reserves $0 $0
Total Indirect Costs $4,426 $4,540
Total Costs $80,499 $82,003
Total Assessment $69,529 $70,919
General Benefit Contribution $14,255 $14,255
Combined Assessment & General Fund Contribution $83,784 $85,174 Surplus / (Deficit) $3,285 $3,171
Table 2-5
Zone 5 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $67,169 $68,513 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Debt Service Replacement1 $27,931 $27,931
Total Direct Costs $95,100 $96,443
Indirect Costs
Administration Costs $2,063 $2,104
Assessment Engineer $3,748 $3,860
Capital Improvement Reserves $0 $0
Total Indirect Costs $5,810 $5,964
Total Costs $100,910 $102,407
Total Assessment $104,485 $106,575
Surplus / (Deficit) $3,575 $4,168
1 The City purchased streetlight poles from SCE and the estimated costs for debt service contribution and acquisitions costs is reflected in the debt service payment for that zone.
2. Cost Estimates Page | 7
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-6
Zone 6 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $7,522 $7,673 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Debt Service Replacement1 $2,549 $2,549
Total Direct Costs $10,071 $10,222
Indirect Costs
Administration Costs $1,932 $1,971
Assessment Engineer $438 $451
Capital Improvement Reserves $0 $0
Total Indirect Costs $2,370 $2,422
Total Costs $12,442 $12,644
Total Assessment $12,200 $12,444
Surplus / (Deficit) ($242) ($200)
Table 2-7
Zone 7 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $75,799 $77,315 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Debt Service Replacement1 $12,746 $12,746
Total Direct Costs $88,545 $90,061
Indirect Costs
Administration Costs $1,931 $1,970
Assessment Engineer $2,666 $2,746
Capital Improvement Reserves $0 $0
Total Indirect Costs $4,597 $4,716
Total Costs $93,142 $94,777
Total Assessment $87,335 $89,081
Surplus / (Deficit) ($5,808) ($5,696)
1 The City purchased streetlight poles from SCE and the estimated costs for debt service contribution and acquisitions costs is reflected in the debt service payment for that zone.
2. Cost Estimates Page | 8
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-8
Zone 8 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $735 $750
Street Lighting Operations & Maintenance $0 $0
Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $735 $750
Indirect Costs
Administration Costs $1,031 $1,052
Assessment Engineer $53 $54
Capital Improvement Reserves $0 $0
Total Indirect Costs $1,084 $1,106
Total Costs $1,819 $1,856
Total Assessment $1,475 $1,505
Surplus / (Deficit) ($344) ($351)
Table 2-9
Zone 9 Budget1
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $0 $0
Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $0 $0
Indirect Costs
Administration Costs $0 $0
Assessment Engineer $0 $0
Capital Improvement Reserves $0 $0
Total Indirect Costs $0 $0
Total Costs $0 $0
Total Assessment $0 $0
Surplus / (Deficit) $0 $0
1 Not levied in Fiscal Year 2025-26. Improvements have not been accepted at this time.
2. Cost Estimates Page | 9
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-10
Zone 11 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $147,203 $150,147 Park Landscaping Operations & Maintenance $154,515 $157,605 Capital Replacement - Parks $0 $0
Debt Service Replacement1 $19,950 $19,950
Total Direct Costs $321,668 $327,702
Indirect Costs
Administration Costs $1,031 $1,052
Assessment Engineer $10,732 $11,054
Capital Improvement Reserves $0 $0
Total Indirect Costs $11,763 $12,106
Total Costs $333,431 $339,808
Total Assessment $356,797 $363,933
Surplus / (Deficit) $23,366 $24,125
Table 2-11
Zone 14 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $12,415 $12,663 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Debt Service Replacement1 $4,988 $4,988
Total Direct Costs $17,402 $17,651
Indirect Costs
Administration Costs $1,932 $1,971
Assessment Engineer $723 $745
Capital Improvement Reserves $0 $0
Total Indirect Costs $2,656 $2,716
Total Costs $20,058 $20,367
Total Assessment $20,158 $20,561
Surplus / (Deficit) $100 $194
1 The City purchased streetlight poles from SCE and the estimated costs for debt service contribution and acquisitions costs is reflected in the debt service payment for that zone.
2. Cost Estimates Page | 10
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-12
Zone 15 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $11,760 $11,995
Street Lighting Operations & Maintenance $0 $0
Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $11,760 $11,995
Indirect Costs
Administration Costs $0 $0
Assessment Engineer $427 $439
Capital Improvement Reserves $0 $0
Total Indirect Costs $427 $439
Total Costs $12,186 $12,434
Total Assessment $11,907 $12,145
Surplus / (Deficit) ($279) ($289)
Table 2-13
Zone 16 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $8,149 $8,312
Street Lighting Operations & Maintenance $0 $0
Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $8,149 $8,312
Indirect Costs
Administration Costs $1,031 $1,052
Assessment Engineer $342 $352
Capital Improvement Reserves $0 $0
Total Indirect Costs $1,373 $1,404
Total Costs $9,522 $9,716
Total Assessment $9,527 $9,718
Surplus / (Deficit) $5 $2
2. Cost Estimates Page | 11
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-14
Zone 17 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $5,809 $5,926 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $5,809 $5,926
Indirect Costs
Administration Costs $1,931 $1,970
Assessment Engineer $267 $275
Capital Improvement Reserves $0 $0
Total Indirect Costs $2,198 $2,245
Total Costs $8,007 $8,170
Total Assessment $7,440 $7,589
Surplus / (Deficit) ($568) ($582)
Table 2-15
Zone 18 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $13,942 $14,221 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $13,942 $14,221
Indirect Costs
Administration Costs $1,031 $1,052
Assessment Engineer $555 $572
Capital Improvement Reserves $0 $0
Total Indirect Costs $1,587 $1,624
Total Costs $15,529 $15,845
Total Assessment $15,483 $15,793
Surplus / (Deficit) ($46) ($52)
2. Cost Estimates Page | 12
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-16
Zone 19 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $6,738 $6,873 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $6,738 $6,873
Indirect Costs
Administration Costs $972 $991
Assessment Engineer $261 $269
Capital Improvement Reserves $0 $0
Total Indirect Costs $1,233 $1,260
Total Costs $7,971 $8,133
Total Assessment $7,281 $7,426
Surplus / (Deficit) ($690) ($706)
Table 2-17
Zone 20 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $14,964 $15,263
Street Lighting Operations & Maintenance $0 $0
Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $14,964 $15,263
Indirect Costs
Administration Costs $1,932 $1,971
Assessment Engineer $487 $502
Transfer to Operating Reserves $0 $0
Total Indirect Costs $2,419 $2,473
Total Costs $17,383 $17,736
Total Assessment $13,573 $13,845
Citywide LMD Contribution $0 $0
Combined Assessment & General Fund Contribution $13,573 $13,845 Surplus / (Deficit) ($3,810) ($3,891)
2. Cost Estimates Page | 13
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-18
Zone 21 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $8,538 $8,709
Street Lighting Operations & Maintenance $4,429 $4,518 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $12,968 $13,227
Indirect Costs
Administration Costs $1,402 $1,430
Assessment Engineer $607 $625
Capital Improvement Reserves $0 $0
Total Indirect Costs $2,009 $2,055
Total Costs $14,977 $15,282
Total Assessment $16,918 $17,256
Surplus / (Deficit) $1,941 $1,974
Table 2-19
Zone 22 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $5,841 $5,958
Street Lighting Operations & Maintenance $0 $0
Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $5,841 $5,958
Indirect Costs
Administration Costs $1,031 $1,052
Assessment Engineer $256 $263
Capital Improvement Reserves $0 $0
Total Indirect Costs $1,287 $1,315
Total Costs $7,128 $7,273
Total Assessment $7,131 $7,274
Surplus / (Deficit) $3 $1
2. Cost Estimates Page | 14
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-20
Zone 23 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $4,905 $5,003
Street Lighting Operations & Maintenance $0 $0
Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $4,905 $5,003
Indirect Costs
Administration Costs $1,031 $1,052
Assessment Engineer $221 $228
Capital Improvement Reserves $0 $0
Total Indirect Costs $1,252 $1,279
Total Costs $6,157 $6,282
Total Assessment $6,163 $6,286
Surplus / (Deficit) $6 $3
Table 2-21
Zone 24 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $6,245 $6,370 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $6,245 $6,370
Indirect Costs
Administration Costs $953 $972
Assessment Engineer $266 $274
Capital Improvement Reserves $0 $0
Total Indirect Costs $1,219 $1,246
Total Costs $7,464 $7,616
Total Assessment $7,419 $7,568
Surplus / (Deficit) ($45) ($48)
2. Cost Estimates Page | 15
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 2-22
Zone 25 Budget
Estimated through June 30
Direct Costs FY 2024-25 FY 2025-26
Landscaping Operations & Maintenance $0 $0
Street Lighting Operations & Maintenance $2,510 $2,560 Park Landscaping Operations & Maintenance $0 $0
Capital Replacement - Parks $0 $0
Total Direct Costs $2,510 $2,560
Indirect Costs
Administration Costs $87 $89
Assessment Engineer $66 $68
Capital Improvement Reserves $0 $0
Total Indirect Costs $153 $157
Total Costs $2,663 $2,717
Total Assessment $1,834 $1,871
Surplus / (Deficit) ($828) ($846)
3. Method of Apportionment of Assessment Page | 16
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
General
Part 2 of Division 15 of the Streets and Highways Code, the Landscaping and Lighting Act of 1972, permits the establishment of assessment districts by Agencies for the purpose of providing certain public improvements which include the installation, construction, operation, maintenance, and servicing of street lights, traffic signals, and landscaping.
Section 22573 of the 1972 Act requires that maintenance assessments be levied according to benefit rather than according to assessed value. This section states:
“The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
The Act also permits the designation of zones of benefit within any individual assessment district if "by reason of variation s in the nature, location, and extent of the improvements, the various areas will receive different degrees of benefit from the improv ements" (Sec. 22574). Thus, the Act requires the levy of a true "assessment" based on the actual benefit rather than a "special tax." In addition, Proposition 218, the "Right to Vote on Taxes Act," which was approved on the November 1996 Statewide ballot and added Article XIII D to the California Constitution, requires that a parcel's assessment may not exceed the reasonable cost o f the proportional special benefit conferred on that parcel. Article XIII D provides that only special benefits are assessable, and the City must separate the general benefits from the special benefits. Article XIII D also requires that publicly owned property which benefits from the improvements be assessed.
Reason for Assessment
The assessment is proposed to be levied to pay for the costs of the construction, maintenance , and servicing of landscaping, street lighting, and appurtenant improvements within the District.
Special Benefit Analysis
STREET LANDSCAPING, SLOPES, AND GREENBELTS – Trees, landscaping, hardscape , and appurtenant facilities, if well maintained, provide beautification, shade and enhancement of the desirability of the surroundings, and therefore increase pro perty value.
In Parkways and Land Values, written by John Nolan and Henry V. Hubbard in 1937, it is stated:
"...there is no lack of opinion, based on general principals and experience and common sense, that parkways do in fact add value to property, even though the amount cannot be determined exactly.... Indeed, in most cases where public money has been spent for parkways the assumption has been definitely made that the proposed parkway will show a provable financial profit to the City. It has been believed that the establishment of parkways causes a rise in real estate values throughout the City, or in parts of the City..."
It should be noted that the definition of "parkways" above may include the roadway as well as the landscaping alongside the roadway.
The ongoing operation and maintenance of the street landscaping, slopes and greenways within the individual district, as identified in Section 1 of this Report, provide beautification to the areas that results in a special benefit to the parcels within the tra cts adjacent to the improvements. If these landscaped areas were not properly maintained, the tract would be blighted.
The City of Lake Elsinore considers the maintenance and upkeep of parkways and adjacent slopes to be the responsibility of th e adjacent development due to the added beautification of the local community which extends to the perimeter of the development.
Street Lighting – Proper maintenance and operation of the streetlights benefit all properties within the District by providing security, safety and community character and vitality as outlined below. Streetlights provide only incidental benefits to motorists tra veling to, from or through the area.
3. Method of Apportionment of Assessment Page | 17
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Benefits of Street Lighting
SECURITY AND SAFETY
♦ Mitigates crime
♦ Alleviates the fear of crime
♦ Enhances safe ingress/egress to property
COMMUNITY CHARACTER AND VITALITY
♦ Promotes social interaction
♦ Promotes business and industry
♦ Contributes to a positive nighttime visual image
Improvements that provide a special benefit to an isolated group of parcels of land located within the District are considere d to be a localized benefit, and the costs associated with these improvements are assessed to all assessable parcels receiving the loca lized benefit. Localized benefits include the construction, operation, maintenance , and servicing of the improvements that only benefit the parcels located within the localized areas.
Localized Improvements – Parcels that have localized landscaping, such as entryway landscaping, parkway landscaping, etc. and street lighting, adjacent to or near their parcels directly benefit from the improvements and are assessed for the costs of t he localized improvements.
Assessment Methodology
The maximum annual maintenance assessments shall be increased each year by 2%. The actual assessments levied in any fiscal year will be as approved by the City Council and may not exceed the maximum assessment rate without receiving property owner approval for the increase.
To establish the special benefit to the individual parcels within the District, an Equivalent Dwelling Unit system is used. Each parcel of land is assigned Equivalent Dwelling Units (“EDUs”) in proportion to the estimated special benefit the parcel receives relati ve to the other parcels within the District from landscaping and/or streetlights.
A single-family detached (“SFD”) residential parcel has been selected as the basic unit for calculation of assessments; therefore, the SFD residential parcel is defined as one Equivalent Dwelling Unit (1 EDU). A methodology has been developed to relate all other land uses within each zone to the SFD residential land use as described below. Unless otherwise stated, the following is the methodology.
Equivalent Dwelling Units
Single Family Detached (SFD) – The SFD residential lots benefit equally from the improvements being maintained and are therefore each assigned 1 EDU.
Condominiums – Condominiums will be assessed equivalent to a SFD residential lot; therefore 1 EDU per unit.
Multi-Family Residential (Apartments) – Multi-family residential parcel equivalencies are determined by multiplying the number of dwelling units on each parcel by 0.75, due to the relative population density of this type of dwelling unit and reduced unit size compared to the typical density and size of an SFD. Studies have consistently shown that the average apartment unit impacts infrastructure approximately 75% as much as a single -family residence. (Sources: Institute of Transportation Engineers Informational Report Trip Generation, Fifth Edition, 1991; Metcalf & Eddy, Wastewater Engineering Treatment, Disposal, Reuse, Third Edition , 1991). Trip generation and wastewater usage are a function of population density. Based on this, it is concluded that other infrastructure will be similarly impacted at a reduced level. The smaller average unit size of multiple -residential parcels result in a lesser enhancement per unit to property values. Therefore, multi-family residential parcels are assessed 0.75 EDUs per unit.
Developed Non-Residential (Non-Res) – Developed non-residential properties are defined as improved commercial, industrial, and institutional properties (such as school property or churches). In converting these properties to EDUs the size of the parcel s are compared to the average size of an SFD residential lot, which is 7,260 square feet. This equals approximately 6 SFD lots per acre of land. Therefore, developed non-residential parcels are assigned EDUs at a rate of 6 EDUs per acre.
3. Method of Apportionment of Assessment Page | 18
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Vacant/Parks – Based upon the opinions of professional appraisers, appraising current market property values for real estate in Southern California, the land value portion of a property typically ranges from 20 to 30 percent of the property's total valu e.
Additionally, the utilization of vacant property is significantly less than improved property and vacant property has a traffic generation rate of 0. Therefore, vacant parcels will be assessed at the rate of 25% of Non -Residential properties, or 1.5 EDU per acre or any portion thereof.
Open Space – Parcels designated as open space do not receive special benefits from the improvements and are therefore exempt from the assessment.
Benefit Zones
A system of zones, encompassing both street lighting and street landscaping levels of service, has been developed. These zone s, combined with an assigned land use based on the County -assigned use code for each parcel, have been used as the methodology for spreading the assessments to each parcel within the City.
Table 3-1
Zone 1 – Assessment Summary
There are one hundred thirty -three Single Family Detached parcels within Zone 1. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 1
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Water Ridge $26,852.41 133 $149.88 $149.88 $146.94 2.0%
Table 3-2
Zone 2 – Assessment Summary
There are fifty Single Family Detached parcels within Zone 2. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 2
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Elsinore Homes $12,400.21 50 $238.78 $238.78 $234.10 2.0%
Table 3-3
Zone 3 – Assessment Summary
There are twenty -nine Single Family Dwelling parcels within Zone 3. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 3
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Pepper Grove $19,600.18 29 $667.50 $667.50 $654.41 2.0%
3. Method of Apportionment of Assessment Page | 19
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 3-4
Zone 4 – Assessment Summary
Types of Benefit for Park Maintenance - Within the Zone 4 Serenity development boundary is a 9.52- acre neighborhood park. As a condition of development, the developer must provide for the on-going operation and maintenance of the landscaping improvements for said park.
Development Benefit - All two hundred thirty -three parcels within the development were classified as having a development benefit, since the creation of this funding mechanism satisfies a condition of approval for the development.
Service Benefit - A neighborhood park, by definition, is a park of typically 5 to 20 acres in size and serving an area from ¼ mile up to ½ mile distance, which is generally within walking distance of the park. The park within the Zone 4 boundary is small in size (less than 10 acres); therefore, a service area radius of ¼ mile is used for the service benefit. All parcels within Zone 4 that are in the ¼ mile radius will be assessed for service benefit, in addition to the development benefit, due to their proximity to the park. Therefore, 158 parcels within the development receive the service benefit.
General Benefit - Parcels that are within the ¼ mile radius but not within the District boundaries are considered to receive general, rather than special benefit and are therefore not assessed. There are 54 parcels equaling 165.275 EDUs of general benefit, for a total general benefit contribution of $14,255.
There are two hundred thirty -three Single Family Dwelling parcels within Zone 4. In addition to the landscaping and street lighting maintenance, there is a park maintenance component in this zone.
Zone 4
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Serenity $82,002.82 233
Development $21,426.14 233 $242.31 $242.31 $237.55 2.0% General $60,576.68 158 $333.84 $333.84 $327.29 2.0%
Table 3-5
Zone 5 – Assessment Summary
There are one thousand twelve Single Family Dwelling parcels within Zone 5, separated by the two phases within the development.
Zone 5
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Rosetta Canyon $102,406.94 1,012
Phase 1 $46,079.14 509 $94.22 $94.22 $92.37 2.0%
Phase 2 $56,327.79 503 $116.53 $116.53 $114.25 2.0%
Table 3-6
Zone 6 – Assessment Summary
There are ninety -eight Single Family Detached parcels within Zone 6. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 6
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
La Laguna Phase 3 $12,643.79 98 $126.98 $126.98 $124.49 2.0%
3. Method of Apportionment of Assessment Page | 20
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 3-7
Zone 7 – Assessment Summary
There are nine hundred twenty-four Single Family Dwelling parcels and eleven vacant/park parcels within Zone 7. Each of these parcels is deemed to receive special benefit from the maintenance and operation of the improvements.
Zone 7
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Alberhill Ranch $94,777.06 948 $93.98 $93.98 $92.14 2.0%
Table 3-8
Zone 8 – Assessment Summary
There are one hundred forty -one condominium parcels within Zone 8. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 8
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Belcaro $1,856.17 141 $10.67 $10.67 $10.46 2.0%
Table 3-9
Zone 9 – Assessment Summary
There are one hundred twenty -eight Single Family Undeveloped parcels and one vacant/park parcel with a lot area of 1.57 acres within Zone 9. Each of these parcels is deemed to receive special benefit from the maintenance and operation of the improvements.
Zone 9
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
La Strada $0.00 41 $0.00 $113.60 $111.38 2.0%
Table 3-10
Zone 11 – Assessment Summary
There are sixteen hundred seventy-seven Single Family Dwelling parcels and two non-residential parcels with an area of 14.93 acres within this zone. In addition, the golf course associated with the development on the northwest side does not have any locali zed improvements and is, therefore, not included within the boundaries of the District.
Zone 11
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Summerly $339,808.14 1,767
Lighting 1 Developed $183,643.84 1,767 $111.33 $111.33 $109.15 2.0% Landscaping $156,164.29 1,767 $94.68 $94.68 $92.82 2.0% Lighting 2 Undeveloped $0.00 0 $0.00 $111.33 $109.15 2.0%
3. Method of Apportionment of Assessment Page | 21
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 3-11
Zone 14 – Assessment Summary
There are one hundred ninety Single Family Dwelling parcels within Zone 14. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 14
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Wasson Canyon $20,366.61 190 $108.22 $108.22 $106.09 2.0%
Table 3-12
Zone 15 – Assessment Summary
There are seventy-five Single Family Dwelling parcels within Zone 1 5. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 15
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Trieste $12,434.38 75 $161.94 $161.94 $158.76 2.0%
Table 3-13
Zone 16 – Assessment Summary
There are two multi -family residential parcels with a total of three hundred fifty -two apartment dwelling units within Zone 16. The development was built to convert to condominiums in the future; therefore, each apartment unit is assigned 1 EDU. Each of the se developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 16
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Ridgestone Apartments $9,715.79 352 $27.61 $27.61 $27.07 2.0%
Table 3-14
Zone 17 – Assessment Summary
There are sixty Single Family Dwelling parcels within Zone 17. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 17
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Tract 32503 $8,170.31 60 $126.48 $126.48 $124.00 2.0%
3. Method of Apportionment of Assessment Page | 22
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 3-15
Zone 18 – Assessment Summary
There are ninety -four Single Family Dwelling parcels within Zone 18. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 18
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
La Laguna Phase 4 $15,844.85 94 $168.01 $168.01 $164.71 2.0%
Table 3-16
Zone 19 – Assessment Summary
There are one hundred five Single Family Dwelling parcels within Zone 19. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 19
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
La Laguna Phase 5 $8,132.68 105 $70.73 $70.73 $69.34 2.0%
Table 3-17
Zone 20 – Assessment Summary
There are twenty -one Single Family Dwelling parcels and two vacant parcels within Zone 20. Each of these parcels is deemed to receive special benefit from the maintenance and operation of the improvements.
Zone 20
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Tract 17413-4 $17,735.69 24 $571.16 $571.16 $559.96 2.0%
Table 3-18
Zone 21 – Assessment Summary
There are eighty-one Single Family Dwelling parcels with an area of 20.63 acres within zone 21. The parcels are deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 21
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Makenna Court $15,282.18 81 $213.04 $213.04 $208.86 2.0%
3. Method of Apportionment of Assessment Page | 23
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 3-19
Zone 22 – Assessment Summary
There is one developed non-residential parcel with an area of 5.33 acres within Zone 22. The developed parcel is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 22
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
California Business Condos $7,273.03 32 $227.45 $227.45 $222.99 2.0%
Table 3-20
Zone 23 – Assessment Summary
There are five non-residential parcels with an area of 1.88 acres within Zone 23. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 23
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Diamond Professional Plaza $6,282.38 6 $1,102.78 $1,102.78 $1,081.16 2.0%
Table 3-21
Zone 24 – Assessment Summary
There are one hundred seven Single Family Dwelling parcels within Zone 24. Each of these developed parcels is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 24
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
La Laguna Development $7,615.95 107 $70.73 $70.73 $69.34 2.0%
Table 3-22
Zone 25 – Assessment Summary
There is one developed non-residential parcel with an area of 4.24 acres within Zone 25. The developed parcel is deemed to receive proportional special benefit from the maintenance and operation of the improvements.
Zone 25
Estimated
Cost
FY 2025-26
Assessable
EDUs
Applied
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2025-26
Max
Assessment
per EDU
FY 2024-25
Max
Assessment
Rate
Change (%)
Crane Street $2,716.62 25 $73.55 $73.55 $72.10 2.0%
3. Method of Apportionment of Assessment Page | 24
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Whereas, the City Council of the City of Lake Elsinore, County of Riverside, State of California, did, pursuant to the provisions of the Landscaping and Lighting Act of 1972 (the “Act”), being Division 15 of the Streets and Highways Code of the State of California, adopted its Resolution Initiating Proceedings for the Annual Levy of Assessments and Ordering the Preparation of an Engineer’s Report for Landscaping and Street Lighting Maintenance District No. 1; Whereas, the Resoluti on of Initiation directed Spicer Consulting Group, LLC . to prepare and file a report presenting plans and specifications describing the general nature, location and extent of the improvements to be maintained, an estimate of th e costs of the proposed improvements, including incidental costs and expenses for the referenced Fiscal Year, a diagram of the Distri ct the boundaries of any zones within the District and the lines and dimensions of each lot or parcel of land within the District, a nd an assessment of the estimated costs;
Now Therefore, the following assessment is made to cover the portion of the estimated costs of maintenance, operation, and servicing of said improvements to be paid by the assessable real property within the District in proportion to the estimated benefits to be received:
Table 3-23
Summary of Assessments
Description Budgeted for FY 2025-26
Total Costs $823,918
Surplus / (Deficit) $13,354
City Contribution ($14,255)
Total Assessment $823,018
Table 3-24
Summary of Assessments by Zone
Zone
Fiscal Year
2025-26 Zone
Fiscal Year
2025-26 Zone
Fiscal Year
2025-26
1 $19,934 9 $0 20 $13,845
2 $11,939 11 $363,933 21 $17,256
3 $19,357 14 $20,561 22 $7,274
4 $70,919 15 $12,145 23 $6,286
5 $106,575 16 $9,718 24 $7,568
6 $12,444 17 $7,589 25 $1,871
7 $89,081 18 $15,793
8 $1,505 19 $7,426
Total Assessment $823,018
3. Method of Apportionment of Assessment Page | 25
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Table 3-25
Proposed Assessments
A system of zones, encompassing both street lighting and street landscaping levels of service, has been developed. These zone s, combined with an assigned land use based on the County -assigned use code for each parcel, have been used as the methodology for spreading the assessments to each parcel within the City.
Zone Fiscal Year
%
Increase
Maximum
Assessment
Actual
Assessment
% of
Maximum
Zone 1 2024-25 2.0% $146.94 $146.94 100%
2025-26 2.0% $149.88 $149.88 100%
Zone 2 2024-25 2.0% $234.10 $234.10 100%
2025-26 2.0% $238.78 $238.78 100%
Zone 3 2024-25 2.0% $654.41 $654.41 100%
2025-26 2.0% $667.50 $667.50 100%
Zone
4 Landscape
& Street Lighting
2024-25 2.0% $113.04 $113.04 100%
2025-26 2.0% $115.30 $115.30 100%
Park - Development 2024-25 2.0% $124.51 $124.51 100%
2025-26 2.0% $127.00 $127.00 100%
Park - Service 2024-25 2.0% $89.74 $89.74 100%
2025-26 2.0% $91.53 $91.53 100%
Zone
5 Phase 1 2024-25 2.0% $92.37 $92.37 100%
2025-26 2.0% $94.22 $94.22 100%
Phase 2 2024-25 2.0% $114.25 $114.25 100%
2025-26 2.0% $116.53 $116.53 100%
Zone 6 2024-25 2.0% $124.49 $124.49 100%
2025-26 2.0% $126.98 $126.98 100%
Zone
7 SFD 2024-25 2.0% $92.14 $92.14 100%
2025-26 2.0% $93.98 $93.98 100%
Park 2024-25 2.0% $92.14 $92.14 100%
2025-26 2.0% $93.98 $93.98 100%
Vacant 2024-25 2.0% $92.14 $92.14 100%
2025-26 2.0% $93.98 $93.98 100%
Zone 8 2024-25 2.0% $10.46 $10.46 100%
2025-26 2.0% $10.67 $10.67 100%
Zone 9 2024-25 0.0% $111.38 $0.00 0%
2025-26 0.0% $113.60 $0.00 0%
Zone
11 Street Lighting 1 2024-25 2.0% $109.15 $109.15 100% (Improved) 2025-26 2.0% $111.33 $111.33 100%
Landscaping 2024-25 2.0% $92.82 $92.82 100%
(Not Improved) 2025-26 2.0% $94.68 $94.68 100%
Street Lighting 2 2024-25 2.0% $109.15 $0.00 0%
(Undeveloped) 2025-26 2.0% $111.33 $0.00 0%
Zone 14 2024-25 2.0% $106.09 $106.09 100%
2025-26 2.0% $108.22 $108.22 100%
Zone
15 Landscaping 2024-25 2.0% $158.76 $158.76 100%
2025-26 2.0% $161.94 $161.94 100%
Street Lighting 2024-25 0.0% $0.00 $0.00 0%
2025-26 0.0% $0.00 $0.00 0%
3. Method of Apportionment of Assessment Page | 26
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Zone Fiscal Year
%
Increase
Maximum
Assessment
Actual
Assessment
% of
Maximum
Zone 16 2024-25 2.0% $27.07 $27.07 100%
2025-26 2.0% $27.61 $27.61 100%
Zone 17 2024-25 2.0% $124.00 $124.00 100%
2025-26 2.0% $126.48 $126.48 100%
Zone 18 2024-25 2.0% $164.71 $164.71 100%
2025-26 2.0% $168.01 $168.01 100%
Zone 19 2024-25 2.0% $69.34 $69.34 100%
2025-26 2.0% $70.73 $70.73 100%
Zone 20 2024-25 2.0% $559.96 $559.96 100%
2025-26 2.0% $571.16 $571.16 100%
Zone 21 Landscaping 2024-25 2.0% $93.80 $93.80 100%
2025-26 2.0% $95.68 $95.68 100%
Street Lighting 2024-25 2.0% $115.06 $115.06 100%
2025-26 2.0% $117.36 $117.36 100%
Zone 22 2024-25 2.0% $222.99 $222.99 100%
2025-26 2.0% $227.45 $227.45 100%
Zone 23 2024-25 2.0% $1,081.16 $1,081.16 100%
2025-26 2.0% $1,102.78 $1,102.78 100%
Zone 24 2024-25 2.0% $69.34 $69.34 100%
2025-26 2.0% $70.73 $70.73 100%
Zone 25 2024-25 2.0% $72.10 $72.10 100%
2025-26 2.0% $73.55 $73.55 100%
Administration
It is recognized that using the information from the Riverside County Assessor's secured property tax roll as of July 1 each year as the primary source for the assessment formula may lead to circumstances and errors that do not fit the intent of this program whe n dealing with specific parcels.
Where such circumstances are discovered, either by the persons administrating this program or by the owners of the properties affected, such circumstances shall be reported to the Director of Administrative Services, who may make such final correction s or adjustments as are consistent with the concept, intent and parameters of the programs set forth herein.
Engineer ’s Signature Page | 27
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
Executed this day of 2025.
FRANCISCO MARTINEZ JR
PROFESSIONAL CIVIL ENGINEER NO. 84640
ENGINEER OF WORK
CITY OF LAKE ELSINORE
STATE OF CALIFORNIA
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Roll and Assessment Diagrams thereto attached, was filed with me on the _______ day of ____________, 2025, by adoption of Resolution No. _______by City Council.
CITY CLERK
CITY OF LAKE ELSINORE
STATE OF CALIFORNIA
I HEREBY CERTIFY that the enclosed Engineer’s Report, together with the Assessment Roll and Assessment Diagrams thereto attached, was approved and confirmed by the City Council of the City of Lake Elsinore, California on the _____day of ___________, 2025.
CITY CLERK
CITY OF LAKE ELSINORE
STATE OF CALIFORNIA
21st
May
4. Assessment Rolls Page | 28
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
The actual assessment and the amount of the assessment for the Fiscal Year 202 5-26 apportioned to each parcel as shown on the latest equalized roll at the County Assessor's office are listed in Appendix A of this Report. The description of each lot or parcel is part of the records of the County Assessor of the County of Riverside and such records are, by reference, made part of this Report.
The total assessment for the Fiscal Year 2025-26 is $823,018.1
1 The actual assessment roll amount might have a minimal variance due to rounding.
5. District Diagram Page | 29
City of Lake Elsinore
Engineer’s Report LMD No. 1
Fiscal Year 2025-26
The boundaries of the District are completely within the boundaries of the City of Lake Elsinore. The District Diagram, which incorporates each of the twenty -five (25) benefit zones for Fiscal Year 2025- 26, is on file in the Office of the City Clerk of the City of Lake Elsinore and in Appendix B of this Report. The lines and dimensions of each lot or parcel within the District are those lines and dimensions shown on the maps of the Riverside County Assessor, for the year when this Report was prepared, and are incorporat ed by reference herein and made part of this Report.
Appendix A:
Assessment Rolls
68-8751 - LMD 1 - Zone 1
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
363750001 $149.86 363750002 $149.86 363750003 $149.86
363751001 $149.86 363751002 $149.86 363751003 $149.86
363751004 $149.86 363751005 $149.86 363751006 $149.86
363751007 $149.86 363751008 $149.86 363751009 $149.86
363751010 $149.86 363751011 $149.86 363751012 $149.86
363751013 $149.86 363751014 $149.86 363751015 $149.86
363751016 $149.86 363751017 $149.86 363751018 $149.86
363751019 $149.86 363751020 $149.86 363751021 $149.86
363751022 $149.86 363751023 $149.86 363751024 $149.86
363751025 $149.86 363751026 $149.86 363751027 $149.86
363751028 $149.86 363751029 $149.86 363760001 $149.86
363760002 $149.86 363760003 $149.86 363760004 $149.86
363760005 $149.86 363760006 $149.86 363760007 $149.86
363760008 $149.86 363760009 $149.86 363760010 $149.86
363760011 $149.86 363760012 $149.86 363760013 $149.86
363760014 $149.86 363760015 $149.86 363760016 $149.86
363760017 $149.86 363760018 $149.86 363760019 $149.86
363760020 $149.86 363760021 $149.86 363760022 $149.86
363760023 $149.86 363760024 $149.86 363760025 $149.86
363760026 $149.86 363760027 $149.86 363760028 $149.86
363760029 $149.86 363760030 $149.86 363760031 $149.86
363760032 $149.86 363760033 $149.86 363760034 $149.86
363760035 $149.86 363760036 $149.86 363760037 $149.86
363760038 $149.86 363760039 $149.86 363760040 $149.86
363760041 $149.86 363761001 $149.86 363761002 $149.86
363761003 $149.86 363761004 $149.86 363761005 $149.86
363770001 $149.86 363770002 $149.86 363770003 $149.86
363770004 $149.86 363770005 $149.86 363770006 $149.86
363770007 $149.86 363770008 $149.86 363770009 $149.86
363770010 $149.86 363770011 $149.86 363770012 $149.86
363770013 $149.86 363770014 $149.86 363770015 $149.86
363770016 $149.86 363770017 $149.86 363770018 $149.86
363770019 $149.86 363770020 $149.86 363770021 $149.86
363780001 $149.86 363780002 $149.86 363781001 $149.86
363781002 $149.86 363781003 $149.86 363781004 $149.86
363781005 $149.86 363781006 $149.86 363781007 $149.86
363781008 $149.86 363781009 $149.86 363781010 $149.86
363781011 $149.86 363781012 $149.86 363781013 $149.86
363781014 $149.86 363781015 $149.86 363781016 $149.86
363781017 $149.86 363781018 $149.86 363781019 $149.86
363781020 $149.86 363781021 $149.86 363781022 $149.86
363781023 $149.86 363781024 $149.86 363781025 $149.86
363781026 $149.86 363781027 $149.86 363781028 $149.86
363781029 $149.86 363781030 $149.86
363781031 $149.86 363781032 $149.86
Assessment Roll
Engineer's Report
68-8751 - LMD 1 - Zone 1
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
Totals Parcels 133 Levy $19,931.38
Engineer's Report
68-8752 - LMD 1 - Zone 2
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
379460001 $238.76 379460002 $238.76 379460003 $238.76
379460004 $238.76 379460005 $238.76 379460006 $238.76
379460007 $238.76 379460008 $238.76 379460009 $238.76
379460010 $238.76 379460011 $238.76 379460012 $238.76
379460013 $238.76 379460014 $238.76 379460015 $238.76
379460016 $238.76 379460017 $238.76 379460018 $238.76
379460019 $238.76 379460020 $238.76 379460021 $238.76
379460022 $238.76 379460023 $238.76 379460024 $238.76
379460025 $238.76 379460026 $238.76 379460027 $238.76
379460028 $238.76 379460029 $238.76 379460030 $238.76
379460031 $238.76 379460032 $238.76 379460033 $238.76
379460034 $238.76 379460035 $238.76 379460036 $238.76
379461001 $238.76 379461002 $238.76 379461003 $238.76
379461004 $238.76 379461005 $238.76 379461006 $238.76
379461007 $238.76 379461008 $238.76 379461009 $238.76
379461010 $238.76 379461011 $238.76 379461012 $238.76
379461013 $238.76 379461014 $238.76
Totals Parcels 50 Levy $11,938.00
Assessment Roll
Engineer's Report
68-8753 - LMD 1 - Zone 3
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
373205048 $667.48 373205049 $667.48 373205050 $667.48
373205051 $667.48 373205052 $667.48 373205053 $667.48
373205054 $667.48 373205055 $667.48 373205056 $667.48
373206001 $667.48 373206002 $667.48 373206003 $667.48
373206004 $667.48 373206005 $667.48 373206006 $667.48
373207001 $667.48 373207002 $667.48 373207003 $667.48
373207004 $667.48 373207005 $667.48 373207006 $667.48
373207007 $667.48 373207008 $667.48 373207009 $667.48
373207010 $667.48 373207011 $667.48 373207012 $667.48
373207013 $667.48 373207014 $667.48
Totals Parcels 29 Levy $19,356.92
Assessment Roll
Engineer's Report
68-8754 - LMD 1 - Zone 4
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
370412021 $242.30 370415006 $242.30 370415007 $242.30
370415008 $242.30 370415009 $242.30 370415010 $242.30
370415011 $242.30 370415012 $242.30 370415013 $242.30
370415014 $242.30 370415015 $242.30 370520001 $333.82
370520002 $333.82 370520003 $333.82 370520004 $333.82
370520005 $333.82 370520006 $333.82 370520007 $333.82
370520008 $333.82 370520009 $333.82 370520010 $333.82
370520011 $333.82 370520012 $333.82 370520013 $333.82
370520014 $333.82 370520015 $333.82 370520016 $333.82
370520017 $333.82 370520018 $333.82 370520019 $333.82
370520020 $333.82 370520021 $333.82 370521001 $333.82
370521002 $333.82 370521003 $333.82 370521004 $333.82
370521005 $333.82 370521006 $333.82 370521007 $333.82
370521010 $333.82 370521011 $333.82 370521012 $333.82
370521013 $333.82 370521014 $333.82 370521015 $333.82
370521016 $333.82 370521017 $333.82 370521018 $333.82
370521019 $333.82 370521020 $333.82 370521021 $333.82
370521022 $333.82 370521023 $333.82 370521024 $333.82
370521025 $333.82 370521026 $333.82 370521027 $333.82
370521028 $333.82 370521030 $333.82 370521036 $333.82
370522001 $333.82 370522002 $333.82 370522003 $333.82
370522004 $333.82 370522005 $333.82 370522006 $333.82
370522007 $333.82 370522008 $333.82 370522009 $333.82
370522010 $333.82 370522011 $333.82 370522012 $333.82
370522013 $333.82 370522014 $333.82 370523001 $333.82
370523002 $333.82 370523003 $333.82 370523004 $333.82
370523005 $333.82 370523006 $333.82 370523007 $333.82
370523008 $333.82 370523009 $333.82 370523010 $333.82
370523011 $333.82 370523012 $333.82 370523013 $333.82
370523014 $333.82 370523015 $333.82 370523016 $333.82
370523017 $333.82 370523018 $333.82 370523019 $333.82
370523020 $333.82 370523021 $333.82 370523022 $333.82
370523023 $333.82 370523024 $333.82 370530001 $333.82
370530002 $333.82 370530003 $333.82 370530004 $333.82
370530005 $333.82 370530006 $333.82 370530007 $333.82
370530008 $333.82 370530009 $333.82 370530010 $333.82
370530011 $333.82 370530012 $333.82 370530013 $333.82
370530014 $333.82 370530015 $333.82 370530016 $333.82
370530017 $333.82 370530018 $333.82 370530019 $333.82
370530020 $333.82 370530021 $333.82 370530022 $333.82
370530023 $333.82 370530024 $333.82 370530025 $333.82
370530026 $333.82 370530027 $333.82 370530028 $333.82
370530029 $333.82 370530030 $333.82 370530031 $333.82
370530032 $333.82 370530033 $333.82 370530034 $333.82
370530035 $333.82 370530036 $333.82 370530037 $333.82
Assessment Roll
Engineer's Report
68-8754 - LMD 1 - Zone 4
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
370530038 $333.82 370530039 $333.82 370530040 $333.82
370530041 $333.82 370530042 $333.82 370530043 $333.82
370530044 $333.82 370530045 $333.82 370530046 $333.82
370530047 $333.82 370530048 $333.82 370530049 $333.82
370530050 $333.82 370530051 $333.82 370530052 $333.82
370530053 $333.82 370530054 $333.82 370530055 $333.82
370530056 $242.30 370530057 $242.30 370530058 $242.30
370530059 $242.30 370530060 $242.30 370530061 $242.30
370530062 $242.30 370530063 $242.30 370530064 $242.30
370530065 $242.30 370530066 $242.30 370530067 $242.30
370531001 $333.82 370531002 $333.82 370531003 $333.82
370531004 $333.82 370531005 $333.82 370531006 $333.82
370531007 $333.82 370531008 $333.82 370531009 $333.82
370531010 $333.82 370531011 $333.82 370531012 $333.82
370531013 $333.82 370531014 $333.82 370531015 $333.82
370531016 $333.82 370540001 $242.30 370540002 $242.30
370540003 $242.30 370540004 $242.30 370540005 $242.30
370540006 $242.30 370540007 $242.30 370540008 $242.30
370540009 $242.30 370540010 $242.30 370540011 $242.30
370540012 $242.30 370540013 $242.30 370540014 $242.30
370540015 $242.30 370540016 $242.30 370540017 $242.30
370540018 $242.30 370541001 $242.30 370541002 $242.30
370541003 $242.30 370541004 $242.30 370541005 $242.30
370541006 $242.30 370541007 $242.30 370541008 $242.30
370541009 $242.30 370541010 $242.30 370541011 $242.30
370541012 $242.30 370541013 $242.30 370541014 $242.30
370541015 $242.30 370541016 $242.30 370541017 $242.30
370541018 $242.30 370541019 $242.30 370541020 $242.30
370541021 $242.30 370541022 $242.30 370541023 $242.30
370541024 $242.30 370541025 $242.30 370541026 $242.30
370541027 $242.30 370541028 $242.30 370541029 $242.30
370541030 $242.30 370541031 $242.30 370541032 $242.30
370541033 $242.30 370541034 $242.30
Totals Parcels 233 Levy $70,916.06
Engineer's Report
68-8755 - LMD 1 - Zone 5
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
347440001 $94.22 347440002 $94.22 347440003 $94.22
347440004 $94.22 347440005 $94.22 347440006 $94.22
347440007 $94.22 347440008 $94.22 347440009 $94.22
347440010 $94.22 347440011 $94.22 347440012 $94.22
347440013 $94.22 347440014 $94.22 347440015 $94.22
347440016 $94.22 347440017 $94.22 347440018 $94.22
347440019 $94.22 347440020 $94.22 347440021 $94.22
347440022 $94.22 347440023 $94.22 347440024 $94.22
347440025 $94.22 347440026 $94.22 347440027 $94.22
347440028 $94.22 347440029 $94.22 347440030 $94.22
347440031 $94.22 347440032 $94.22 347440033 $94.22
347440034 $94.22 347440035 $94.22 347440036 $94.22
347440037 $94.22 347440038 $94.22 347440039 $94.22
347440040 $94.22 347440041 $94.22 347440042 $94.22
347440043 $94.22 347440044 $94.22 347440045 $94.22
347440046 $94.22 347440047 $94.22 347440048 $94.22
347440049 $94.22 347440050 $94.22 347440051 $94.22
347450001 $94.22 347450002 $94.22 347450003 $94.22
347450004 $94.22 347450005 $94.22 347450006 $94.22
347450007 $94.22 347450008 $94.22 347450009 $94.22
347450010 $94.22 347450011 $94.22 347450012 $94.22
347450013 $94.22 347450014 $94.22 347450015 $94.22
347450016 $94.22 347450017 $94.22 347450018 $94.22
347450019 $94.22 347450020 $94.22 347450021 $94.22
347450022 $94.22 347450023 $94.22 347450024 $94.22
347450025 $94.22 347450026 $94.22 347450027 $94.22
347450028 $94.22 347450029 $94.22 347450030 $94.22
347450031 $94.22 347450032 $94.22 347451001 $94.22
347451002 $94.22 347451003 $94.22 347451004 $94.22
347451005 $94.22 347452001 $94.22 347452002 $94.22
347452003 $94.22 347452004 $94.22 347452005 $94.22
347452006 $94.22 347452007 $94.22 347452008 $94.22
347452009 $94.22 347452010 $94.22 347452011 $94.22
347452012 $94.22 347453001 $94.22 347453002 $94.22
347453003 $94.22 347453004 $94.22 347453005 $94.22
347453006 $94.22 347453007 $94.22 347453008 $94.22
347453009 $94.22 347453010 $94.22 347453011 $94.22
347453012 $94.22 347453013 $94.22 347453014 $94.22
347453015 $94.22 347453016 $94.22 347453017 $94.22
347453018 $94.22 347453019 $94.22 347453020 $94.22
347453021 $94.22 347453022 $94.22 347453023 $94.22
347453024 $94.22 347453025 $94.22 347453026 $94.22
347453027 $94.22 347453028 $94.22 347460001 $94.22
347460002 $94.22 347460003 $94.22 347460004 $94.22
347460005 $94.22 347460006 $94.22 347460007 $94.22
Assessment Roll
Engineer's Report
68-8755 - LMD 1 - Zone 5
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
347460008 $94.22 347460009 $94.22 347460010 $94.22
347460011 $94.22 347460012 $94.22 347460013 $94.22
347460014 $94.22 347460015 $94.22 347460016 $94.22
347460017 $94.22 347460018 $94.22 347460019 $94.22
347460020 $94.22 347460021 $94.22 347460022 $94.22
347460023 $94.22 347460024 $94.22 347460025 $94.22
347460026 $94.22 347460027 $94.22 347460028 $94.22
347460029 $94.22 347460030 $94.22 347460031 $94.22
347460032 $94.22 347460033 $94.22 347460034 $94.22
347460035 $94.22 347461001 $94.22 347461002 $94.22
347461003 $94.22 347461004 $94.22 347461005 $94.22
347461006 $94.22 347462001 $94.22 347462002 $94.22
347462003 $94.22 347462004 $94.22 347462005 $94.22
347462006 $94.22 347462007 $94.22 347462008 $94.22
347462009 $94.22 347462010 $94.22 347462011 $94.22
347462012 $94.22 347462013 $94.22 347462014 $94.22
347462015 $94.22 347462016 $94.22 347462017 $94.22
347470001 $94.22 347470002 $94.22 347470003 $94.22
347470004 $94.22 347470005 $94.22 347470006 $94.22
347470007 $94.22 347470008 $94.22 347470009 $94.22
347470010 $94.22 347470011 $94.22 347470012 $94.22
347470013 $94.22 347470014 $94.22 347470015 $94.22
347470016 $94.22 347470017 $94.22 347470018 $94.22
347470019 $94.22 347470020 $94.22 347470021 $94.22
347470022 $94.22 347470023 $94.22 347470024 $94.22
347470025 $94.22 347470026 $94.22 347470027 $94.22
347470028 $94.22 347470029 $94.22 347470030 $94.22
347470031 $94.22 347470032 $94.22 347470033 $94.22
347470034 $94.22 347470035 $94.22 347470036 $94.22
347470037 $94.22 347470038 $94.22 347470039 $94.22
347470040 $94.22 347471001 $94.22 347471002 $94.22
347471003 $94.22 347471004 $94.22 347471005 $94.22
347471006 $94.22 347471007 $94.22 347471008 $94.22
347471009 $94.22 347471010 $94.22 347471011 $94.22
347471012 $94.22 347471013 $94.22 347471014 $94.22
347471015 $94.22 347471016 $94.22 347471017 $94.22
347471018 $94.22 347471019 $94.22 347471020 $94.22
347471021 $94.22 347471022 $94.22 347471023 $94.22
347471024 $94.22 347472001 $94.22 347472002 $94.22
347472003 $94.22 347472004 $94.22 347480001 $94.22
347480002 $94.22 347480003 $94.22 347480004 $94.22
347480005 $94.22 347480006 $94.22 347481001 $94.22
347481002 $94.22 347481003 $94.22 347481004 $94.22
347481005 $94.22 347481006 $94.22 347481007 $94.22
347481008 $94.22 347481009 $94.22 347481010 $94.22
Engineer's Report
68-8755 - LMD 1 - Zone 5
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
347481011 $94.22 347481012 $94.22 347482001 $94.22
347482002 $94.22 347482003 $94.22 347482004 $94.22
347482005 $94.22 347482006 $94.22 347482007 $94.22
347482008 $94.22 347482009 $94.22 347482010 $94.22
347482011 $94.22 347482012 $94.22 347482013 $94.22
347482014 $94.22 347482015 $94.22 347482016 $94.22
347482017 $94.22 347482018 $94.22 347482019 $94.22
347482020 $94.22 347482021 $94.22 347482022 $94.22
347482023 $94.22 347482024 $94.22 347482025 $94.22
347483001 $94.22 347483002 $94.22 347483003 $94.22
347483004 $94.22 347483005 $94.22 347483006 $94.22
347483007 $94.22 347483008 $94.22 347483009 $94.22
347483010 $94.22 347483011 $94.22 347483012 $94.22
347490001 $94.22 347490002 $94.22 347491001 $94.22
347491002 $94.22 347491003 $94.22 347491004 $94.22
347491005 $94.22 347491006 $94.22 347491007 $94.22
347491008 $94.22 347492001 $94.22 347492002 $94.22
347492003 $94.22 347492004 $94.22 347492005 $94.22
347492006 $94.22 347492007 $94.22 347492008 $94.22
347492009 $94.22 347492010 $94.22 347492011 $94.22
347492012 $94.22 347492013 $94.22 347492014 $94.22
347492015 $94.22 347493001 $94.22 347493002 $94.22
347493003 $94.22 347493004 $94.22 347493005 $94.22
347493006 $94.22 347493007 $94.22 347493008 $94.22
347493009 $94.22 347493010 $94.22 347493011 $94.22
347493012 $94.22 347493013 $94.22 347493014 $94.22
347493015 $94.22 347493016 $94.22 347493017 $94.22
347493018 $94.22 347494001 $94.22 347494002 $94.22
347494003 $94.22 347494004 $94.22 347494005 $94.22
347494006 $94.22 347494007 $94.22 347494008 $94.22
347494009 $94.22 347494010 $94.22 347494011 $94.22
347494012 $94.22 347494013 $94.22 347494014 $94.22
347494015 $94.22 347494016 $94.22 347494017 $94.22
347494018 $94.22 347494019 $94.22 347494020 $94.22
347494021 $94.22 347494022 $94.22 347494023 $94.22
347494024 $94.22 347494025 $94.22 347494026 $94.22
347494027 $94.22 347494028 $94.22 347500001 $94.22
347500002 $94.22 347500003 $94.22 347500004 $94.22
347500005 $94.22 347500006 $94.22 347500007 $94.22
347500008 $94.22 347500009 $94.22 347500010 $94.22
347500011 $94.22 347500012 $94.22 347500013 $94.22
347500014 $94.22 347500015 $94.22 347500016 $94.22
347500017 $94.22 347500018 $94.22 347500019 $94.22
347501001 $94.22 347501002 $94.22 347501003 $94.22
347501004 $94.22 347501005 $94.22 347501006 $94.22
Engineer's Report
68-8755 - LMD 1 - Zone 5
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
347502001 $94.22 347502002 $94.22 347502003 $94.22
347502004 $94.22 347502005 $94.22 347510001 $94.22
347510002 $94.22 347510003 $94.22 347510004 $94.22
347510005 $94.22 347511001 $94.22 347511002 $94.22
347511003 $94.22 347511004 $94.22 347511005 $94.22
347511006 $94.22 347511007 $94.22 347511008 $94.22
347511009 $94.22 347511010 $94.22 347511011 $94.22
347511012 $94.22 347511013 $94.22 347511014 $94.22
347511015 $94.22 347511016 $94.22 347511017 $94.22
347511018 $94.22 347511019 $94.22 347511020 $94.22
347511021 $94.22 347511022 $94.22 347511023 $94.22
347511024 $94.22 347511025 $94.22 347511026 $94.22
347511027 $94.22 347511028 $94.22 347511029 $94.22
347511030 $94.22 347511031 $94.22 347511032 $94.22
347511033 $94.22 347511034 $94.22 347511035 $94.22
347511036 $94.22 347511037 $94.22 347511038 $94.22
347511039 $94.22 347511040 $94.22 347511041 $94.22
347511042 $94.22 347512001 $94.22 347512002 $94.22
347512003 $94.22 347512004 $94.22 347512005 $94.22
347512006 $94.22 347512007 $94.22 347512008 $94.22
347512009 $94.22 347520001 $94.22 347520002 $94.22
347520003 $94.22 347520004 $94.22 347520005 $94.22
347520006 $94.22 347520007 $94.22 347520008 $94.22
347520009 $94.22 347520010 $94.22 347520011 $94.22
347520012 $94.22 347520013 $94.22 347520014 $94.22
347520015 $94.22 347520016 $94.22 347520017 $94.22
347520018 $94.22 347520019 $94.22 347520020 $94.22
347520021 $94.22 347520022 $94.22 347520023 $94.22
347520024 $94.22 347520025 $94.22 347520026 $94.22
347520027 $94.22 347520028 $94.22 347520029 $94.22
347520030 $94.22 347521001 $94.22 347521002 $94.22
347521003 $94.22 347521004 $94.22 347521005 $94.22
347521006 $94.22 347521007 $94.22 347521008 $94.22
347521009 $94.22 347521010 $94.22 347521011 $94.22
347521012 $94.22 347521013 $94.22 349510003 $116.52
349510004 $116.52 349510005 $116.52 349510006 $116.52
349510007 $116.52 349510008 $116.52 349510009 $116.52
349510010 $116.52 349510012 $116.52 349510013 $116.52
349511001 $116.52 349511002 $116.52 349511003 $116.52
349511004 $116.52 349511005 $116.52 349511006 $116.52
349511007 $116.52 349511008 $116.52 349511009 $116.52
349511010 $116.52 349511011 $116.52 349511012 $116.52
349511013 $116.52 349511014 $116.52 349511015 $116.52
349511016 $116.52 349511017 $116.52 349511018 $116.52
349511019 $116.52 349511020 $116.52 349511021 $116.52
Engineer's Report
68-8755 - LMD 1 - Zone 5
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
349511022 $116.52 349511023 $116.52 349511024 $116.52
349511025 $116.52 349511026 $116.52 349511027 $116.52
349511028 $116.52 349511029 $116.52 349511030 $116.52
349512001 $116.52 349512002 $116.52 349512003 $116.52
349512004 $116.52 349512005 $116.52 349512006 $116.52
349512007 $116.52 349512008 $116.52 349512009 $116.52
349512010 $116.52 349512011 $116.52 349512012 $116.52
349512013 $116.52 349512014 $116.52 349512015 $116.52
349513001 $116.52 349513002 $116.52 349513003 $116.52
349513004 $116.52 349513005 $116.52 349513006 $116.52
349513007 $116.52 349513008 $116.52 349513009 $116.52
349513010 $116.52 349513011 $116.52 349513012 $116.52
349513013 $116.52 349513014 $116.52 349513015 $116.52
349513016 $116.52 349513017 $116.52 349513018 $116.52
349513019 $116.52 349513020 $116.52 349513021 $116.52
349513022 $116.52 349513023 $116.52 349513024 $116.52
349513025 $116.52 349513026 $116.52 349513027 $116.52
349513028 $116.52 349513029 $116.52 349513030 $116.52
349513031 $116.52 349513032 $116.52 349514001 $116.52
349514002 $116.52 349514003 $116.52 349514004 $116.52
349514005 $116.52 349514006 $116.52 349514007 $116.52
349520001 $116.52 349520002 $116.52 349520003 $116.52
349520004 $116.52 349520005 $116.52 349520006 $116.52
349520007 $116.52 349521001 $116.52 349521002 $116.52
349521003 $116.52 349521004 $116.52 349521005 $116.52
349521006 $116.52 349521007 $116.52 349521008 $116.52
349521009 $116.52 349522001 $116.52 349522002 $116.52
349522003 $116.52 349522004 $116.52 349522005 $116.52
349522006 $116.52 349522007 $116.52 349522008 $116.52
349522009 $116.52 349522010 $116.52 349522011 $116.52
349522012 $116.52 349522013 $116.52 349522014 $116.52
349522015 $116.52 349522016 $116.52 349523001 $116.52
349523002 $116.52 349523003 $116.52 349523004 $116.52
349523005 $116.52 349523006 $116.52 349523007 $116.52
349523008 $116.52 349523009 $116.52 349523010 $116.52
349523011 $116.52 349523012 $116.52 349523013 $116.52
349523014 $116.52 349523015 $116.52 349523016 $116.52
349523017 $116.52 349523018 $116.52 349524001 $116.52
349524002 $116.52 349524003 $116.52 349524004 $116.52
349524005 $116.52 349524006 $116.52 349524007 $116.52
349524008 $116.52 349524009 $116.52 349524010 $116.52
349524011 $116.52 349524012 $116.52 349524013 $116.52
349524014 $116.52 349524015 $116.52 349524016 $116.52
349524017 $116.52 349524018 $116.52 349524019 $116.52
349524020 $116.52 349524021 $116.52 349524022 $116.52
Engineer's Report
68-8755 - LMD 1 - Zone 5
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
349524023 $116.52 349524024 $116.52 349524025 $116.52
349524026 $116.52 349524027 $116.52 349524028 $116.52
349530001 $116.52 349530002 $116.52 349530003 $116.52
349530004 $116.52 349530005 $116.52 349531001 $116.52
349531002 $116.52 349531003 $116.52 349531004 $116.52
349531005 $116.52 349531006 $116.52 349531007 $116.52
349531008 $116.52 349531009 $116.52 349531010 $116.52
349531011 $116.52 349531012 $116.52 349531013 $116.52
349531014 $116.52 349532001 $116.52 349532002 $116.52
349532003 $116.52 349532004 $116.52 349532005 $116.52
349532006 $116.52 349532007 $116.52 349532008 $116.52
349532009 $116.52 349532010 $116.52 349532011 $116.52
349532012 $116.52 349532013 $116.52 349532014 $116.52
349532015 $116.52 349532016 $116.52 349532017 $116.52
349533001 $116.52 349533002 $116.52 349533003 $116.52
349533004 $116.52 349533005 $116.52 349540001 $116.52
349540002 $116.52 349540003 $116.52 349540004 $116.52
349540005 $116.52 349540008 $116.52 349540009 $116.52
349540010 $116.52 349540011 $116.52 349541001 $116.52
349541002 $116.52 349541003 $116.52 349541004 $116.52
349541005 $116.52 349541006 $116.52 349541007 $116.52
349541008 $116.52 349541009 $116.52 349541010 $116.52
349541011 $116.52 349541012 $116.52 349541013 $116.52
349541014 $116.52 349541015 $116.52 349541016 $116.52
349541017 $116.52 349541018 $116.52 349541020 $116.52
349541021 $116.52 349541022 $116.52 349541023 $116.52
349541024 $116.52 349541025 $116.52 349541026 $116.52
349541027 $116.52 349541028 $116.52 349541029 $116.52
349541030 $116.52 349541031 $116.52 349541032 $116.52
349541033 $116.52 349541034 $116.52 349542001 $116.52
349542002 $116.52 349542003 $116.52 349542004 $116.52
349542005 $116.52 349542006 $116.52 349542007 $116.52
349542008 $116.52 349542009 $116.52 349542010 $116.52
349542011 $116.52 349542012 $116.52 349542013 $116.52
349542014 $116.52 349542015 $116.52 349542016 $116.52
349542017 $116.52 349542018 $116.52 349550001 $116.52
349550002 $116.52 349550003 $116.52 349550004 $116.52
349550005 $116.52 349550006 $116.52 349550007 $116.52
349550008 $116.52 349550009 $116.52 349550010 $116.52
349550011 $116.52 349550012 $116.52 349550013 $116.52
349550014 $116.52 349550015 $116.52 349550016 $116.52
349550017 $116.52 349550018 $116.52 349550019 $116.52
349550020 $116.52 349550021 $116.52 349550022 $116.52
349550023 $116.52 349550024 $116.52 349550025 $116.52
349550026 $116.52 349550027 $116.52 349550028 $116.52
Engineer's Report
68-8755 - LMD 1 - Zone 5
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
349551001 $116.52 349551002 $116.52 349551003 $116.52
349551004 $116.52 349551005 $116.52 349551006 $116.52
349551007 $116.52 349551008 $116.52 349551009 $116.52
349551010 $116.52 349551011 $116.52 349551012 $116.52
349551013 $116.52 349551014 $116.52 349551015 $116.52
349551016 $116.52 349551017 $116.52 349560001 $116.52
349560002 $116.52 349560003 $116.52 349560004 $116.52
349560005 $116.52 349560006 $116.52 349560007 $116.52
349560008 $116.52 349560009 $116.52 349560010 $116.52
349560011 $116.52 349560012 $116.52 349560013 $116.52
349560014 $116.52 349560015 $116.52 349560016 $116.52
349560017 $116.52 349560018 $116.52 349560019 $116.52
349560020 $116.52 349560021 $116.52 349560022 $116.52
349560023 $116.52 349560024 $116.52 349560025 $116.52
349560026 $116.52 349560027 $116.52 349560028 $116.52
349560029 $116.52 349560030 $116.52 349560031 $116.52
349560032 $116.52 349561001 $116.52 349561002 $116.52
349561003 $116.52 349561004 $116.52 349561005 $116.52
349561006 $116.52 349561007 $116.52 349561008 $116.52
349561009 $116.52 349561010 $116.52 349561011 $116.52
349561012 $116.52 349561013 $116.52 349561014 $116.52
349561015 $116.52 349561016 $116.52 349561017 $116.52
349561018 $116.52 349561019 $116.52 349561020 $116.52
349561021 $116.52 349561022 $116.52 349561023 $116.52
349561024 $116.52 349561025 $116.52 349561026 $116.52
349561027 $116.52 349561028 $116.52 349561029 $116.52
349561030 $116.52 349561031 $116.52 349561032 $116.52
349561033 $116.52 349562001 $116.52 349562002 $116.52
349562003 $116.52 349562004 $116.52 349562005 $116.52
349562006 $116.52 349562007 $116.52 349562008 $116.52
349570001 $116.52 349570002 $116.52 349570003 $116.52
349570004 $116.52 349570005 $116.52 349570006 $116.52
349570007 $116.52 349570008 $116.52 349570009 $116.52
349570010 $116.52 349570011 $116.52 349570012 $116.52
349570013 $116.52 349570014 $116.52 349570015 $116.52
349570016 $116.52 349570017 $116.52 349570018 $116.52
349571001 $116.52 349571002 $116.52 349571003 $116.52
349571004 $116.52 349571005 $116.52 349571006 $116.52
349571007 $116.52 349571008 $116.52 349571009 $116.52
349571010 $116.52 349571011 $116.52 349571012 $116.52
349571013 $116.52 349571014 $116.52 349571015 $116.52
349571016 $116.52 349571017 $116.52 349572001 $116.52
349572002 $116.52 349572003 $116.52 349572004 $116.52
349572005 $116.52 349572006 $116.52 349572007 $116.52
349572008 $116.52 349580001 $116.52 349580002 $116.52
Engineer's Report
68-8755 - LMD 1 - Zone 5
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
349580003 $116.52 349580004 $116.52 349580005 $116.52
349580006 $116.52 349580007 $116.52 349580008 $116.52
349580009 $116.52 349580010 $116.52 349580011 $116.52
349580012 $116.52 349580013 $116.52 349580014 $116.52
349580015 $116.52 349580016 $116.52 349580017 $116.52
349580018 $116.52 349580019 $116.52 349580020 $116.52
349580021 $116.52 349580022 $116.52 349580023 $116.52
349580024 $116.52 349580025 $116.52 349580026 $116.52
349580027 $116.52 349580028 $116.52 349590001 $116.52
349590002 $116.52 349590003 $116.52 349590004 $116.52
349590005 $116.52 349590006 $116.52 349590007 $116.52
349590008 $116.52 349590009 $116.52 349590010 $116.52
349590011 $116.52 349590012 $116.52 349590013 $116.52
349590014 $116.52 349590015 $116.52 349590016 $116.52
349590017 $116.52 349590018 $116.52 349590019 $116.52
349590020 $116.52 349590021 $116.52 349590022 $116.52
349590023 $116.52 349590024 $116.52 349590025 $116.52
349590026 $116.52 349590027 $116.52 349590028 $116.52
349590029 $116.52 349590030 $116.52 349590031 $116.52
349591001 $116.52 349591002 $116.52 349591003 $116.52
349591004 $116.52 349591005 $116.52 349591006 $116.52
349591007 $116.52 349591008 $116.52
349591009 $116.52 349591010 $116.52
Totals Parcels 1,012 Levy $106,567.54
Engineer's Report
68-8756 - LMD 1 - Zone 6
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
394230001 $126.96 394230002 $126.96 394230003 $126.96
394230004 $126.96 394230005 $126.96 394230006 $126.96
394230007 $126.96 394230008 $126.96 394230009 $126.96
394230010 $126.96 394230011 $126.96 394230012 $126.96
394230013 $126.96 394230014 $126.96 394230015 $126.96
394230016 $126.96 394230017 $126.96 394230018 $126.96
394230019 $126.96 394230020 $126.96 394230021 $126.96
394230022 $126.96 394230023 $126.96 394230024 $126.96
394230025 $126.96 394230026 $126.96 394230027 $126.96
394231001 $126.96 394231002 $126.96 394231003 $126.96
394231004 $126.96 394231005 $126.96 394231006 $126.96
394231007 $126.96 394231008 $126.96 394231009 $126.96
394231010 $126.96 394231011 $126.96 394231012 $126.96
394231013 $126.96 394231014 $126.96 394231015 $126.96
394231016 $126.96 394231017 $126.96 394231018 $126.96
394231019 $126.96 394231020 $126.96 394231021 $126.96
394232001 $126.96 394232002 $126.96 394232003 $126.96
394232004 $126.96 394232006 $126.96 394232007 $126.96
394232008 $126.96 394232009 $126.96 394232010 $126.96
394232011 $126.96 394232012 $126.96 394232013 $126.96
394232014 $126.96 394270001 $126.96 394270002 $126.96
394270003 $126.96 394270004 $126.96 394270005 $126.96
394270006 $126.96 394270007 $126.96 394270008 $126.96
394270009 $126.96 394270010 $126.96 394270011 $126.96
394270012 $126.96 394270013 $126.96 394270014 $126.96
394270015 $126.96 394270016 $126.96 394270017 $126.96
394270018 $126.96 394270019 $126.96 394270020 $126.96
394270021 $126.96 394270022 $126.96 394270023 $126.96
394270024 $126.96 394270025 $126.96 394270026 $126.96
394270027 $126.96 394270028 $126.96 394270029 $126.96
394270030 $126.96 394270031 $126.96 394270032 $126.96
394270033 $126.96 394270034 $126.96 394270035 $126.96
394270036 $126.96 394270037 $126.96
Totals Parcels 98 Levy $12,442.08
Assessment Roll
Engineer's Report
68-8757 - LMD 1 - Zone 7
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
389020048 $1,475.98 389090030 $1,060.10 389122006 $45.10 389122007 $88.80 389122012 $159.28 389122013 $132.50
389122014 $38.06 389122015 $50.74 389122016 $38.06
389122017 $152.24 389680001 $93.98 389680002 $93.98
389680003 $93.98 389680004 $93.98 389680005 $93.98
389680006 $93.98 389680007 $93.98 389680008 $93.98
389680009 $93.98 389680010 $93.98 389680011 $93.98
389680012 $93.98 389680013 $93.98 389680014 $93.98
389680015 $93.98 389680016 $93.98 389681001 $93.98
389681002 $93.98 389681003 $93.98 389681004 $93.98
389681005 $93.98 389681006 $93.98 389681007 $93.98
389681008 $93.98 389681009 $93.98 389681010 $93.98
389681011 $93.98 389681012 $93.98 389681013 $93.98
389681014 $93.98 389681015 $93.98 389681016 $93.98
389681017 $93.98 389681018 $93.98 389681019 $93.98
389681020 $93.98 389681021 $93.98 389681022 $93.98
389681028 $93.98 389690001 $93.98 389690002 $93.98
389690003 $93.98 389690004 $93.98 389690005 $93.98
389690006 $93.98 389690007 $93.98 389690008 $93.98
389690009 $93.98 389690010 $93.98 389690011 $93.98
389691001 $93.98 389691002 $93.98 389691003 $93.98
389691004 $93.98 389691005 $93.98 389691006 $93.98
389691007 $93.98 389691008 $93.98 389691009 $93.98
389691010 $93.98 389691011 $93.98 389691012 $93.98
389691013 $93.98 389691014 $93.98 389691015 $93.98
389691016 $93.98 389691017 $93.98 389691018 $93.98
389691019 $93.98 389691020 $93.98 389691021 $93.98
389691022 $93.98 389691023 $93.98 389691024 $93.98
389691025 $93.98 389691026 $93.98 389691027 $93.98
389691028 $93.98 389691029 $93.98 389691030 $93.98
389691031 $93.98 389691032 $93.98 389691033 $93.98
389691034 $93.98 389691035 $93.98 389691036 $93.98
389691037 $93.98 389691038 $93.98 389691039 $93.98
389691040 $93.98 389691041 $93.98 389691042 $93.98
389691043 $93.98 389691044 $93.98 389691045 $93.98
389691046 $93.98 389691047 $93.98 389691048 $93.98
389691049 $93.98 389691050 $93.98 389691051 $93.98
389691052 $93.98 389691053 $93.98 389691054 $93.98
389700001 $93.98 389700002 $93.98 389700003 $93.98
389700004 $93.98 389700005 $93.98 389700006 $93.98
389700007 $93.98 389700008 $93.98 389700009 $93.98
389700010 $93.98 389700011 $93.98 389700012 $93.98
389700013 $93.98 389700014 $93.98 389700015 $93.98
389700016 $93.98 389700017 $93.98 389701001 $93.98
389701002 $93.98 389701003 $93.98 389701004 $93.98
Assessment Roll
Engineer's Report
68-8757 - LMD 1 - Zone 7
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
389701005 $93.98 389701006 $93.98 389701007 $93.98
389701008 $93.98 389701009 $93.98 389701010 $93.98
389701011 $93.98 389701012 $93.98 389701013 $93.98
389701014 $93.98 389701015 $93.98 389701016 $93.98
389701017 $93.98 389701018 $93.98 389701019 $93.98
389701020 $93.98 389701021 $93.98 389701022 $93.98
389701023 $93.98 389701024 $93.98 389701025 $93.98
389701026 $93.98 389701027 $93.98 389701028 $93.98
389701029 $93.98 389701030 $93.98 389701031 $93.98
389701032 $93.98 389701033 $93.98 389701034 $93.98
389701035 $93.98 389710001 $93.98 389710002 $93.98
389710003 $93.98 389710004 $93.98 389710005 $93.98
389710006 $93.98 389710007 $93.98 389710008 $93.98
389710009 $93.98 389710010 $93.98 389711001 $93.98
389711002 $93.98 389711003 $93.98 389711004 $93.98
389711005 $93.98 389711006 $93.98 389711007 $93.98
389711008 $93.98 389711009 $93.98 389711010 $93.98
389711011 $93.98 389711012 $93.98 389711013 $93.98
389711014 $93.98 389711015 $93.98 389711016 $93.98
389711017 $93.98 389711018 $93.98 389711019 $93.98
389711020 $93.98 389711021 $93.98 389711022 $93.98
389711023 $93.98 389711024 $93.98 389711025 $93.98
389711026 $93.98 389711027 $93.98 389711028 $93.98
389711029 $93.98 389711030 $93.98 389711031 $93.98
389711032 $93.98 389711033 $93.98 389711034 $93.98
389711035 $93.98 389711036 $93.98 389711037 $93.98
389712001 $93.98 389712002 $93.98 389712003 $93.98
389712004 $93.98 389712005 $93.98 389712006 $93.98
389712007 $93.98 389712008 $93.98 389712009 $93.98
389712010 $93.98 389712011 $93.98 389712012 $93.98
389712013 $93.98 389712014 $93.98 389712015 $93.98
389712016 $93.98 389712017 $93.98 389720001 $93.98
389720002 $93.98 389720003 $93.98 389720004 $93.98
389720005 $93.98 389720008 $93.98 389720009 $93.98
389720010 $93.98 389720011 $93.98 389720012 $93.98
389720013 $93.98 389720014 $93.98 389720015 $93.98
389720016 $93.98 389720017 $93.98 389720018 $93.98
389720019 $93.98 389720020 $93.98 389720021 $93.98
389720022 $93.98 389720023 $93.98 389720026 $93.98
389720027 $93.98 389720028 $93.98 389720029 $93.98
389720030 $93.98 389720031 $93.98 389720032 $93.98
389720033 $93.98 389720034 $93.98 389720035 $93.98
389720036 $93.98 389720037 $93.98 389720038 $93.98
389720039 $93.98 389720040 $93.98 389720041 $93.98
389720042 $93.98 389720043 $93.98 389720044 $93.98
Engineer's Report
68-8757 - LMD 1 - Zone 7
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
389720045 $93.98 389720046 $93.98 389720047 $93.98
389720048 $93.98 389720049 $93.98 389720050 $93.98
389720053 $93.98 389720054 $93.98 389720055 $93.98
389720056 $93.98 389721001 $93.98 389721002 $93.98
389721003 $93.98 389721004 $93.98 389721005 $93.98
389721006 $93.98 389721007 $93.98 389721008 $93.98
389721009 $93.98 389721010 $93.98 389721011 $93.98
389721012 $93.98 389721013 $93.98 389730001 $93.98
389730002 $93.98 389730003 $93.98 389730004 $93.98
389730005 $93.98 389730006 $93.98 389730007 $93.98
389730008 $93.98 389730009 $93.98 389730010 $93.98
389730011 $93.98 389730012 $93.98 389730013 $93.98
389730014 $93.98 389730015 $93.98 389730016 $93.98
389730017 $93.98 389730018 $93.98 389730019 $93.98
389730020 $93.98 389730021 $93.98 389730022 $93.98
389730023 $93.98 389730024 $93.98 389730025 $93.98
389730026 $93.98 389730027 $93.98 389730028 $93.98
389730029 $93.98 389730030 $93.98 389730031 $93.98
389731001 $93.98 389731002 $93.98 389731003 $93.98
389731004 $93.98 389731005 $93.98 389731006 $93.98
389731007 $93.98 389731008 $93.98 389731009 $93.98
389731010 $93.98 389731011 $93.98 389731012 $93.98
389731013 $93.98 389731014 $93.98 389731015 $93.98
389731016 $93.98 389731017 $93.98 389731018 $93.98
389731019 $93.98 389731020 $93.98 389731021 $93.98
389731022 $93.98 389731023 $93.98 389731024 $93.98
389731025 $93.98 389731026 $93.98 389731027 $93.98
389740001 $93.98 389740002 $93.98 389740003 $93.98
389740004 $93.98 389740005 $93.98 389740006 $93.98
389740007 $93.98 389740008 $93.98 389740009 $93.98
389740010 $93.98 389740011 $93.98 389740012 $93.98
389740013 $93.98 389740014 $93.98 389740015 $93.98
389740016 $93.98 389740017 $93.98 389740018 $93.98
389740019 $93.98 389740020 $93.98 389740021 $93.98
389740022 $93.98 389740023 $93.98 389740024 $93.98
389740025 $93.98 389740026 $93.98 389740027 $93.98
389740028 $93.98 389740029 $93.98 389740030 $93.98
389740031 $93.98 389740032 $93.98 389740033 $93.98
389740034 $93.98 389740035 $93.98 389740036 $93.98
389740037 $93.98 389740038 $93.98 389740039 $93.98
389740040 $93.98 389740041 $93.98 389740042 $93.98
389740043 $93.98 389740044 $93.98 389740045 $93.98
389740046 $93.98 389740047 $93.98 389740048 $93.98
389740049 $93.98 389740050 $93.98 389740051 $93.98
389740052 $93.98 389740053 $93.98 389740054 $93.98
Engineer's Report
68-8757 - LMD 1 - Zone 7
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
389740055 $93.98 389740056 $93.98 389740057 $93.98
389740058 $93.98 389740059 $93.98 389740060 $93.98
389740061 $93.98 389740062 $93.98 389740063 $93.98
389740064 $93.98 389740065 $93.98 389740066 $93.98
389740067 $93.98 389740068 $93.98 389750001 $93.98
389750002 $93.98 389750003 $93.98 389750004 $93.98
389750005 $93.98 389750006 $93.98 389751001 $93.98
389751002 $93.98 389751003 $93.98 389751004 $93.98
389751005 $93.98 389751006 $93.98 389751007 $93.98
389751008 $93.98 389751009 $93.98 389751010 $93.98
389751011 $93.98 389751012 $93.98 389751013 $93.98
389751014 $93.98 389751015 $93.98 389751016 $93.98
389751017 $93.98 389751018 $93.98 389751019 $93.98
389751020 $93.98 389751021 $93.98 389751022 $93.98
389751023 $93.98 389751024 $93.98 389751025 $93.98
389752001 $93.98 389752002 $93.98 389752003 $93.98
389752004 $93.98 389752005 $93.98 389752006 $93.98
389752007 $93.98 389752008 $93.98 389752009 $93.98
389752010 $93.98 389752011 $93.98 389752012 $93.98
389752013 $93.98 389752014 $93.98 389752015 $93.98
389752016 $93.98 389752017 $93.98 389752018 $93.98
389752019 $93.98 389752020 $93.98 389752021 $93.98
389752022 $93.98 389752023 $93.98 389752024 $93.98
389752025 $93.98 389752026 $93.98 389752027 $93.98
389752028 $93.98 389752029 $93.98 389752030 $93.98
389752031 $93.98 389752032 $93.98 389752033 $93.98
389752034 $93.98 389752035 $93.98 389752036 $93.98
389752037 $93.98 389752038 $93.98 389752039 $93.98
389752040 $93.98 389752041 $93.98 389752042 $93.98
389752043 $93.98 389752044 $93.98 389752045 $93.98
389761001 $93.98 389761002 $93.98 389761003 $93.98
389761004 $93.98 389761005 $93.98 389761006 $93.98
389761007 $93.98 389761008 $93.98 389761009 $93.98
389761010 $93.98 389761011 $93.98 389761014 $93.98
389761015 $93.98 389761016 $93.98 389761017 $93.98
389761018 $93.98 389761019 $93.98 389761020 $93.98
389762001 $93.98 389762002 $93.98 389762003 $93.98
389762004 $93.98 389762005 $93.98 389762006 $93.98
389762007 $93.98 389762008 $93.98 389771001 $93.98
389771002 $93.98 389771003 $93.98 389771004 $93.98
389771005 $93.98 389771006 $93.98 389771007 $93.98
389771008 $93.98 389771009 $93.98 389771010 $93.98
389771011 $93.98 389771012 $93.98 389772001 $93.98
389772002 $93.98 389772003 $93.98 389772004 $93.98
389772005 $93.98 389772006 $93.98 389772007 $93.98
Engineer's Report
68-8757 - LMD 1 - Zone 7
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
389772008 $93.98 389772009 $93.98 389772010 $93.98
389772011 $93.98 389772012 $93.98 389772013 $93.98
389772014 $93.98 389772015 $93.98 389772016 $93.98
389772017 $93.98 389772018 $93.98 389772019 $93.98
389772020 $93.98 389772021 $93.98 389772022 $93.98
389772023 $93.98 389772024 $93.98 389773001 $93.98
389773002 $93.98 389773003 $93.98 389773004 $93.98
389773005 $93.98 389773006 $93.98 389773007 $93.98
389773008 $93.98 389773009 $93.98 389773010 $93.98
389773011 $93.98 389773012 $93.98 389773013 $93.98
389773014 $93.98 389773015 $93.98 389773016 $93.98
389773017 $93.98 389773018 $93.98 389773019 $93.98
389773020 $93.98 389790001 $93.98 389790002 $93.98
389790003 $93.98 389790004 $93.98 389790005 $93.98
389790006 $93.98 389790007 $93.98 389790008 $93.98
389790009 $93.98 389790010 $93.98 389790011 $93.98
389790012 $93.98 389790013 $93.98 389790014 $93.98
389790015 $93.98 389790016 $93.98 389790017 $93.98
389790018 $93.98 389790019 $93.98 389790020 $93.98
389790021 $93.98 389790022 $93.98 389790023 $93.98
389790024 $93.98 389790025 $93.98 389790026 $93.98
389790027 $93.98 389790028 $93.98 389790029 $93.98
389790030 $93.98 389790031 $93.98 389790032 $93.98
389790033 $93.98 389790034 $93.98 389790035 $93.98
389790036 $93.98 389790037 $93.98 389790038 $93.98
389790039 $93.98 389790040 $93.98 389790041 $93.98
389790042 $93.98 389800001 $93.98 389800002 $93.98
389800003 $93.98 389800004 $93.98 389800005 $93.98
389800006 $93.98 389800007 $93.98 389800008 $93.98
389800009 $93.98 389800010 $93.98 389800011 $93.98
389800012 $93.98 389800013 $93.98 389800014 $93.98
389800015 $93.98 389800016 $93.98 389800017 $93.98
389800018 $93.98 389800019 $93.98 389800020 $93.98
389800021 $93.98 389800022 $93.98 389800023 $93.98
389800024 $69.06 389801001 $93.98 389801002 $93.98
389801003 $93.98 389801004 $93.98 389801005 $93.98
389801006 $93.98 389801007 $93.98 389801008 $93.98
389801009 $93.98 389801010 $93.98 389801011 $93.98
389801012 $93.98 389801013 $93.98 389801014 $93.98
389801015 $93.98 389801016 $93.98 389801017 $93.98
389801018 $93.98 389801019 $93.98 389801020 $93.98
389801021 $93.98 389801022 $93.98 389801023 $93.98
389801024 $93.98 389801025 $93.98 389801026 $93.98
389801027 $93.98 389801028 $93.98 389801029 $93.98
389802001 $93.98 389802002 $93.98 389802003 $93.98
Engineer's Report
68-8757 - LMD 1 - Zone 7
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
389802004 $93.98 389802005 $93.98 389802006 $93.98
389802007 $93.98 389802008 $93.98 389802009 $93.98
389802010 $93.98 389802011 $93.98 389802012 $93.98
389802013 $93.98 389802014 $93.98 389802015 $93.98
389802016 $93.98 389802017 $93.98 389802018 $93.98
389810001 $93.98 389810002 $93.98 389810003 $93.98
389810004 $93.98 389810005 $93.98 389810006 $93.98
389810007 $93.98 389810008 $93.98 389810009 $93.98
389810010 $93.98 389810011 $93.98 389810012 $93.98
389810013 $93.98 389810014 $93.98 389810015 $93.98
389810016 $93.98 389810017 $93.98 389810018 $93.98
389810019 $93.98 389810020 $93.98 389810021 $93.98
389810022 $93.98 389810023 $93.98 389810024 $93.98
389810025 $93.98 389810026 $93.98 389810027 $93.98
389810028 $93.98 389810029 $93.98 389810030 $93.98
389811001 $93.98 389811002 $93.98 389811003 $93.98
389811004 $93.98 389811005 $93.98 389811006 $93.98
389811007 $93.98 389811008 $93.98 389811009 $93.98
389811010 $93.98 389812001 $93.98 389812002 $93.98
389812003 $93.98 389812004 $93.98 389812005 $93.98
389812006 $93.98 389812007 $93.98 389812008 $93.98
389812009 $93.98 389812010 $93.98 389812011 $93.98
389812012 $93.98 389812013 $93.98 389812014 $93.98
389812015 $93.98 389812016 $93.98 389820001 $93.98
389820002 $93.98 389820003 $93.98 389820004 $93.98
389820005 $93.98 389820006 $93.98 389821001 $93.98
389821002 $93.98 389821003 $93.98 389821004 $93.98
389821005 $93.98 389821006 $93.98 389822001 $93.98
389822002 $93.98 389822003 $93.98 389822004 $93.98
389822005 $93.98 389822006 $93.98 389822007 $93.98
389822008 $93.98 389822009 $93.98 389822010 $93.98
389822011 $93.98 389822012 $93.98 389822013 $93.98
389822014 $93.98 389822015 $93.98 389822016 $93.98
389822017 $93.98 389822018 $93.98 389822019 $93.98
389822020 $93.98 389822021 $93.98 389822022 $93.98
389822023 $93.98 389822024 $93.98 389822025 $93.98
389822026 $93.98 389822027 $93.98 389822028 $93.98
389822029 $93.98 389822030 $93.98 389822031 $93.98
389822032 $93.98 389822033 $93.98 389822034 $93.98
389823001 $93.98 389823002 $93.98 389823003 $93.98
389823004 $93.98 389823005 $93.98 389823006 $93.98
389823007 $93.98 389823008 $93.98 389830001 $93.98
389830002 $93.98 389830003 $93.98 389830004 $93.98
389830005 $93.98 389830006 $93.98 389830007 $93.98
389830008 $93.98 389830009 $93.98 389830010 $93.98
Engineer's Report
68-8757 - LMD 1 - Zone 7
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
389830011 $93.98 389830012 $93.98 389830013 $93.98
389830014 $93.98 389830015 $93.98 389830016 $93.98
389830017 $93.98 389830018 $93.98 389830019 $93.98
389830020 $93.98 389830021 $93.98 389830022 $28.18
389831001 $93.98 389831002 $93.98 389831003 $93.98
389831004 $93.98 389831005 $93.98 389831006 $93.98
389831007 $93.98 389831008 $93.98 389831009 $93.98
389831010 $93.98 389831011 $93.98 389831012 $93.98
389831013 $93.98 389831014 $93.98 389831015 $93.98
389831016 $93.98 389831017 $93.98 389832001 $93.98
389832002 $93.98 389832003 $93.98 389832004 $93.98
389832005 $93.98 389832006 $93.98 389832007 $93.98
389832008 $93.98 389832009 $93.98 389832010 $93.98
389840001 $93.98 389840002 $93.98 389840003 $93.98
389840004 $93.98 389840005 $93.98 389840006 $93.98
389840007 $93.98 389840008 $93.98 389840009 $93.98
389840010 $93.98 389840011 $93.98 389840012 $93.98
389840013 $93.98 389840014 $93.98 389840015 $93.98
389840016 $93.98 389840017 $93.98 389840018 $93.98
389840019 $93.98 389840020 $93.98 389840021 $93.98
389840022 $93.98 389840024 $125.46 389841001 $93.98
389841002 $93.98 389841003 $93.98 389841004 $93.98
389841005 $93.98 389841006 $93.98 389841007 $93.98
389841008 $93.98 389841009 $93.98 389841010 $93.98
389841011 $93.98 389841012 $93.98 389841013 $93.98
389841014 $93.98 389841015 $93.98 389841016 $93.98
389841017 $93.98 389841018 $93.98 389841019 $93.98
389841020 $93.98 389841021 $93.98 389841022 $93.98
389841023 $93.98 389841024 $93.98 389841025 $93.98
389841026 $93.98 389841027 $93.98 389841028 $93.98
389841029 $93.98 389841030 $93.98 389841031 $93.98
389841032 $93.98 389841033 $93.98 389841034 $93.98
389841035 $93.98 389841036 $93.98 389841037 $93.98
389841038 $93.98 389841039 $93.98 389841040 $93.98
389841041 $93.98 389841042 $93.98 389841043 $93.98
389841044 $93.98 389841045 $93.98 389841046 $93.98
389841047 $93.98 389841048 $93.98 389841049 $93.98
389841050 $93.98 389841051 $93.98 389841052 $93.98
Totals Parcels 924 Levy $89,079.34
Engineer's Report
68-8758 - LMD 1 - Zone 8
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
373225001 $10.66 373225002 $10.66 373225003 $10.66
373225004 $10.66 373225005 $10.66 373225006 $10.66
373225007 $10.66 373225008 $10.66 373225009 $10.66
373225010 $10.66 373225011 $10.66 373225012 $10.66
373225013 $10.66 373225014 $10.66 373225015 $10.66
373225016 $10.66 373225017 $10.66 373225018 $10.66
373225019 $10.66 373225020 $10.66 373225021 $10.66
373225022 $10.66 373225023 $10.66 373225024 $10.66
373225025 $10.66 373225026 $10.66 373225027 $10.66
373225028 $10.66 373225029 $10.66 373225030 $10.66
373225032 $10.66 373225033 $10.66 373225034 $10.66
373225035 $10.66 373225036 $10.66 373225037 $10.66
373225038 $10.66 373225039 $10.66 373225040 $10.66
373225041 $10.66 373225042 $10.66 373225043 $10.66
373225044 $10.66 373225045 $10.66 373225046 $10.66
373225047 $10.66 373225048 $10.66 373225049 $10.66
373225051 $10.66 373225052 $10.66 373225053 $10.66
373225054 $10.66 373225055 $10.66 373225056 $10.66
373225057 $10.66 373225058 $10.66 373225059 $10.66
373225060 $10.66 373225061 $10.66 373225062 $10.66
373226001 $10.66 373226002 $10.66 373226003 $10.66
373226004 $10.66 373226005 $10.66 373226006 $10.66
373226007 $10.66 373226008 $10.66 373226009 $10.66
373226010 $10.66 373226011 $10.66 373226012 $10.66
373226013 $10.66 373226014 $10.66 373226015 $10.66
373226016 $10.66 373226017 $10.66 373226018 $10.66
373226019 $10.66 373226020 $10.66 373226021 $10.66
373226022 $10.66 373226023 $10.66 373226024 $10.66
373226026 $10.66 373226027 $10.66 373226028 $10.66
373226029 $10.66 373226030 $10.66 373226031 $10.66
373226032 $10.66 373226033 $10.66 373226034 $10.66
373226035 $10.66 373226036 $10.66 373226037 $10.66
373226038 $10.66 373226039 $10.66 373226040 $10.66
373226041 $10.66 373226042 $10.66 373226043 $10.66
373226044 $10.66 373226045 $10.66 373226046 $10.66
373226047 $10.66 373226048 $10.66 373226049 $10.66
373226050 $10.66 373226051 $10.66 373226052 $10.66
373226053 $10.66 373226054 $10.66 373226055 $10.66
373226057 $10.66 373226058 $10.66 373226059 $10.66
373226060 $10.66 373226061 $10.66 373226062 $10.66
373226063 $10.66 373226064 $10.66 373226065 $10.66
373226066 $10.66 373226067 $10.66 373226068 $10.66
373226069 $10.66 373226070 $10.66 373226071 $10.66
373226072 $10.66 373226073 $10.66 373226074 $10.66
373226075 $10.66 373226076 $10.66 373226077 $10.66
Assessment Roll
Engineer's Report
68-8758 - LMD 1 - Zone 8
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
373226078 $10.66 373226079 $10.66 373226080 $10.66
373226081 $10.66 373226082 $10.66 373226083 $10.66
Totals Parcels 141 Levy $1,503.06
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
371030035 $14,375.38 371030038 $4,078.98 371280001 $206.00 371280002 $206.00 371280003 $206.00 371280004 $206.00
371280005 $206.00 371280006 $206.00 371280007 $206.00
371280008 $206.00 371280009 $206.00 371280010 $206.00
371280011 $206.00 371280012 $206.00 371280013 $206.00
371280014 $206.00 371280015 $206.00 371280016 $206.00
371280017 $206.00 371280018 $206.00 371280019 $206.00
371280020 $206.00 371280021 $206.00 371280022 $206.00
371280023 $206.00 371280024 $206.00 371281001 $206.00
371281002 $206.00 371281003 $206.00 371281004 $206.00
371281005 $206.00 371281006 $206.00 371281007 $206.00
371281008 $206.00 371281009 $206.00 371281010 $206.00
371281011 $206.00 371281012 $206.00 371281013 $206.00
371281014 $206.00 371281015 $206.00 371281016 $206.00
371281017 $206.00 371281018 $206.00 371281019 $206.00
371281020 $206.00 371281021 $206.00 371281022 $206.00
371281023 $206.00 371281024 $206.00 371281025 $206.00
371281026 $206.00 371281027 $206.00 371281028 $206.00
371281029 $206.00 371281030 $206.00 371290001 $206.00
371290002 $206.00 371290003 $206.00 371290004 $206.00
371290005 $206.00 371290006 $206.00 371290007 $206.00
371290008 $206.00 371290009 $206.00 371290010 $206.00
371290011 $206.00 371290012 $206.00 371291001 $206.00
371291002 $206.00 371291003 $206.00 371291004 $206.00
371291005 $206.00 371291006 $206.00 371291007 $206.00
371291008 $206.00 371291009 $206.00 371291010 $206.00
371291011 $206.00 371291012 $206.00 371291013 $206.00
371291014 $206.00 371291015 $206.00 371291016 $206.00
371291017 $206.00 371291018 $206.00 371291019 $206.00
371291020 $206.00 371291021 $206.00 371291022 $206.00
371291023 $206.00 371292001 $206.00 371292002 $206.00
371292003 $206.00 371292004 $206.00 371292005 $206.00
371292006 $206.00 371292007 $206.00 371292008 $206.00
371292009 $206.00 371292010 $206.00 371292011 $206.00
371292012 $206.00 371292013 $206.00 371292014 $206.00
371292015 $206.00 371292016 $206.00 371292017 $206.00
371292018 $206.00 371292019 $206.00 371292020 $206.00
371292021 $206.00 371292022 $206.00 371292023 $206.00
371292024 $206.00 371292025 $206.00 371292026 $206.00
371292027 $206.00 371292028 $206.00 371292029 $206.00
371292030 $206.00 371300001 $206.00 371300002 $206.00
371300003 $206.00 371300004 $206.00 371300005 $206.00
371300006 $206.00 371300007 $206.00 371300008 $206.00
371300009 $206.00 371300010 $206.00 371300011 $206.00
371300012 $206.00 371300013 $206.00 371300014 $206.00
Assessment Roll
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371300015 $206.00 371300016 $206.00 371300017 $206.00
371300018 $206.00 371300019 $206.00 371300020 $206.00
371300021 $206.00 371300022 $206.00 371300023 $206.00
371300024 $206.00 371300025 $206.00 371300026 $206.00
371300027 $206.00 371300028 $206.00 371300029 $206.00
371301001 $206.00 371301002 $206.00 371301003 $206.00
371301004 $206.00 371301005 $206.00 371301006 $206.00
371301007 $206.00 371301008 $206.00 371301009 $206.00
371301010 $206.00 371301011 $206.00 371301012 $206.00
371301013 $206.00 371301014 $206.00 371301015 $206.00
371301016 $206.00 371302001 $206.00 371302002 $206.00
371302003 $206.00 371302004 $206.00 371302005 $206.00
371302006 $206.00 371302007 $206.00 371302008 $206.00
371303001 $206.00 371303002 $206.00 371303003 $206.00
371303004 $206.00 371303005 $206.00 371303006 $206.00
371303007 $206.00 371303008 $206.00 371303009 $206.00
371303010 $206.00 371310001 $206.00 371310002 $206.00
371310003 $206.00 371310004 $206.00 371310005 $206.00
371310006 $206.00 371310007 $206.00 371310008 $206.00
371310009 $206.00 371310010 $206.00 371310011 $206.00
371310012 $206.00 371310013 $206.00 371310014 $206.00
371310015 $206.00 371310016 $206.00 371310017 $206.00
371310018 $206.00 371310019 $206.00 371310020 $206.00
371310021 $206.00 371310022 $206.00 371310023 $206.00
371310024 $206.00 371310025 $206.00 371310026 $206.00
371310027 $206.00 371311001 $206.00 371311002 $206.00
371311003 $206.00 371311004 $206.00 371311005 $206.00
371311006 $206.00 371311007 $206.00 371311008 $206.00
371311009 $206.00 371311010 $206.00 371311011 $206.00
371311012 $206.00 371311013 $206.00 371311014 $206.00
371311015 $206.00 371311016 $206.00 371311017 $206.00
371311018 $206.00 371312001 $206.00 371312002 $206.00
371312003 $206.00 371312004 $206.00 371312005 $206.00
371312006 $206.00 371312007 $206.00 371312008 $206.00
371312009 $206.00 371313001 $206.00 371313002 $206.00
371313003 $206.00 371313004 $206.00 371313005 $206.00
371313006 $206.00 371313007 $206.00 371313008 $206.00
371313009 $206.00 371313010 $206.00 371314001 $206.00
371314002 $206.00 371314003 $206.00 371314004 $206.00
371314005 $206.00 371314006 $206.00 371314007 $206.00
371314008 $206.00 371320001 $206.00 371320002 $206.00
371320003 $206.00 371320004 $206.00 371320005 $206.00
371320006 $206.00 371320007 $206.00 371320008 $206.00
371320009 $206.00 371320011 $206.00 371320012 $206.00
371320013 $206.00 371320014 $206.00 371320015 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371320016 $206.00 371320017 $206.00 371320018 $206.00
371320019 $206.00 371320020 $206.00 371320021 $206.00
371320022 $206.00 371320023 $206.00 371320024 $206.00
371320025 $206.00 371320026 $206.00 371320027 $206.00
371320028 $206.00 371320029 $206.00 371320030 $206.00
371320031 $206.00 371321001 $206.00 371321002 $206.00
371321003 $206.00 371321004 $206.00 371321005 $206.00
371321006 $206.00 371321007 $206.00 371321008 $206.00
371322001 $206.00 371322002 $206.00 371322003 $206.00
371322004 $206.00 371322005 $206.00 371322006 $206.00
371322007 $206.00 371322008 $206.00 371322009 $206.00
371322010 $206.00 371322011 $206.00 371322012 $206.00
371322013 $206.00 371322014 $206.00 371323001 $206.00
371323002 $206.00 371323003 $206.00 371323004 $206.00
371323005 $206.00 371323006 $206.00 371323007 $206.00
371323008 $206.00 371323009 $206.00 371323010 $206.00
371323011 $206.00 371323012 $206.00 371324001 $206.00
371324002 $206.00 371324003 $206.00 371324004 $206.00
371324005 $206.00 371324006 $206.00 371324007 $206.00
371324009 $206.00 371324010 $206.00 371324011 $206.00
371324012 $206.00 371324013 $206.00 371324014 $206.00
371330001 $206.00 371330002 $206.00 371330003 $206.00
371330004 $206.00 371330005 $206.00 371330006 $206.00
371330007 $206.00 371330008 $206.00 371330009 $206.00
371330010 $206.00 371330011 $206.00 371330012 $206.00
371330013 $206.00 371330014 $206.00 371330015 $206.00
371330016 $206.00 371330017 $206.00 371330018 $206.00
371330019 $206.00 371330020 $206.00 371330021 $206.00
371330022 $206.00 371330023 $206.00 371330024 $206.00
371330025 $206.00 371330026 $206.00 371330027 $206.00
371330028 $206.00 371330029 $206.00 371330030 $206.00
371330031 $206.00 371330032 $206.00 371330033 $206.00
371330034 $206.00 371330035 $206.00 371330036 $206.00
371330037 $206.00 371331001 $206.00 371331002 $206.00
371331003 $206.00 371331004 $206.00 371331005 $206.00
371331006 $206.00 371331007 $206.00 371331008 $206.00
371331009 $206.00 371331010 $206.00 371331011 $206.00
371331012 $206.00 371331013 $206.00 371331014 $206.00
371331015 $206.00 371332001 $206.00 371332002 $206.00
371332003 $206.00 371332004 $206.00 371332005 $206.00
371332006 $206.00 371333001 $206.00 371333002 $206.00
371333003 $206.00 371333004 $206.00 371333005 $206.00
371333006 $206.00 371333007 $206.00 371333008 $206.00
371333009 $206.00 371333010 $206.00 371333011 $206.00
371333012 $206.00 371333013 $206.00 371333014 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371333015 $206.00 371333016 $206.00 371340001 $206.00
371340002 $206.00 371340003 $206.00 371340004 $206.00
371340005 $206.00 371340006 $206.00 371340007 $206.00
371340008 $206.00 371340009 $206.00 371340010 $206.00
371340011 $206.00 371340012 $206.00 371340013 $206.00
371340014 $206.00 371340015 $206.00 371340016 $206.00
371340017 $206.00 371340018 $206.00 371340019 $206.00
371340020 $206.00 371340021 $206.00 371340022 $206.00
371340023 $206.00 371340024 $206.00 371340025 $206.00
371340026 $206.00 371340027 $206.00 371340028 $206.00
371340029 $206.00 371340030 $206.00 371340031 $206.00
371340032 $206.00 371340033 $206.00 371340034 $206.00
371340035 $206.00 371340036 $206.00 371340037 $206.00
371340038 $206.00 371340039 $206.00 371340040 $206.00
371340041 $206.00 371340042 $206.00 371340043 $206.00
371340044 $206.00 371340045 $206.00 371340046 $206.00
371340047 $206.00 371340048 $206.00 371340049 $206.00
371341001 $206.00 371341002 $206.00 371341003 $206.00
371341004 $206.00 371341005 $206.00 371341006 $206.00
371341007 $206.00 371341008 $206.00 371341009 $206.00
371341010 $206.00 371341011 $206.00 371341012 $206.00
371342001 $206.00 371342002 $206.00 371342003 $206.00
371342004 $206.00 371342005 $206.00 371342006 $206.00
371342007 $206.00 371342008 $206.00 371342009 $206.00
371342010 $206.00 371342011 $206.00 371342012 $206.00
371342013 $206.00 371342014 $206.00 371342015 $206.00
371342016 $206.00 371342017 $206.00 371350001 $206.00
371350002 $206.00 371350003 $206.00 371350004 $206.00
371350005 $206.00 371350006 $206.00 371350007 $206.00
371350008 $206.00 371350009 $206.00 371350010 $206.00
371350011 $206.00 371350012 $206.00 371350013 $206.00
371350014 $206.00 371350015 $206.00 371350016 $206.00
371350017 $206.00 371350018 $206.00 371350019 $206.00
371350020 $206.00 371350021 $206.00 371351001 $206.00
371351002 $206.00 371351003 $206.00 371351004 $206.00
371351005 $206.00 371351006 $206.00 371351007 $206.00
371351008 $206.00 371351009 $206.00 371351010 $206.00
371351011 $206.00 371351012 $206.00 371351013 $206.00
371351014 $206.00 371351015 $206.00 371351016 $206.00
371351017 $206.00 371351018 $206.00 371351019 $206.00
371351020 $206.00 371351021 $206.00 371351022 $206.00
371351023 $206.00 371351024 $206.00 371351025 $206.00
371351026 $206.00 371351027 $206.00 371351028 $206.00
371351029 $206.00 371351030 $206.00 371351031 $206.00
371351032 $206.00 371351033 $206.00 371351034 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371351035 $206.00 371351036 $206.00 371351037 $206.00
371351038 $206.00 371351039 $206.00 371351040 $206.00
371351041 $206.00 371351042 $206.00 371351043 $206.00
371360001 $206.00 371360002 $206.00 371360003 $206.00
371360004 $206.00 371360005 $206.00 371360006 $206.00
371360007 $206.00 371360008 $206.00 371360009 $206.00
371360010 $206.00 371360011 $206.00 371360012 $206.00
371360013 $206.00 371360014 $206.00 371360015 $206.00
371360016 $206.00 371360017 $206.00 371360018 $206.00
371360019 $206.00 371360020 $206.00 371360021 $206.00
371360022 $206.00 371360023 $206.00 371360024 $206.00
371360025 $206.00 371360026 $206.00 371360027 $206.00
371360028 $206.00 371360029 $206.00 371360030 $206.00
371360031 $206.00 371360032 $206.00 371360033 $206.00
371360034 $206.00 371360035 $206.00 371360036 $206.00
371360037 $206.00 371360038 $206.00 371360039 $206.00
371360040 $206.00 371360041 $206.00 371360042 $206.00
371360043 $206.00 371360044 $206.00 371360045 $206.00
371361001 $206.00 371361002 $206.00 371361003 $206.00
371361004 $206.00 371361005 $206.00 371361006 $206.00
371361007 $206.00 371361008 $206.00 371361009 $206.00
371361010 $206.00 371361011 $206.00 371361012 $206.00
371361013 $206.00 371361014 $206.00 371361015 $206.00
371361016 $206.00 371361017 $206.00 371361018 $206.00
371361019 $206.00 371361020 $206.00 371361021 $206.00
371361022 $206.00 371361023 $206.00 371361024 $206.00
371361025 $206.00 371370001 $206.00 371370002 $206.00
371370003 $206.00 371370004 $206.00 371370005 $206.00
371370006 $206.00 371370007 $206.00 371370008 $206.00
371370009 $206.00 371370010 $206.00 371370011 $206.00
371370012 $206.00 371370013 $206.00 371370014 $206.00
371370015 $206.00 371370016 $206.00 371370017 $206.00
371370018 $206.00 371370019 $206.00 371370020 $206.00
371370021 $206.00 371370022 $206.00 371370023 $206.00
371370024 $206.00 371370025 $206.00 371370026 $206.00
371370027 $206.00 371370028 $206.00 371370029 $206.00
371370030 $206.00 371370031 $206.00 371370032 $206.00
371370033 $206.00 371370034 $206.00 371370035 $206.00
371370036 $206.00 371370037 $206.00 371370038 $206.00
371370039 $206.00 371371001 $206.00 371371002 $206.00
371371003 $206.00 371371004 $206.00 371371005 $206.00
371371006 $206.00 371371007 $206.00 371371008 $206.00
371371009 $206.00 371371010 $206.00 371371011 $206.00
371372001 $206.00 371372002 $206.00 371372003 $206.00
371372004 $206.00 371372005 $206.00 371372006 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371372007 $206.00 371372008 $206.00 371373001 $206.00
371373002 $206.00 371373003 $206.00 371373004 $206.00
371373005 $206.00 371373006 $206.00 371380001 $206.00
371380002 $206.00 371380003 $206.00 371380004 $206.00
371380005 $206.00 371380006 $206.00 371380007 $206.00
371380008 $206.00 371380009 $206.00 371380010 $206.00
371380011 $206.00 371380012 $206.00 371380013 $206.00
371380014 $206.00 371380015 $206.00 371380016 $206.00
371380017 $206.00 371380018 $206.00 371380019 $206.00
371380020 $206.00 371380021 $206.00 371381001 $206.00
371381002 $206.00 371381003 $206.00 371381004 $206.00
371381005 $206.00 371381006 $206.00 371381007 $206.00
371381008 $206.00 371381009 $206.00 371381010 $206.00
371381011 $206.00 371381012 $206.00 371381013 $206.00
371381014 $206.00 371381015 $206.00 371382001 $206.00
371382002 $206.00 371382003 $206.00 371382004 $206.00
371382005 $206.00 371382006 $206.00 371382007 $206.00
371382008 $206.00 371382009 $206.00 371382010 $206.00
371382011 $206.00 371382012 $206.00 371382013 $206.00
371382014 $206.00 371382015 $206.00 371382016 $206.00
371382017 $206.00 371390001 $206.00 371390002 $206.00
371390003 $206.00 371390004 $206.00 371390005 $206.00
371390006 $206.00 371390007 $206.00 371390008 $206.00
371390009 $206.00 371390010 $206.00 371390011 $206.00
371390012 $206.00 371390013 $206.00 371390014 $206.00
371390015 $206.00 371390016 $206.00 371390017 $206.00
371390018 $206.00 371390019 $206.00 371390020 $206.00
371390021 $206.00 371390022 $206.00 371391001 $206.00
371391002 $206.00 371391003 $206.00 371391004 $206.00
371391005 $206.00 371391006 $206.00 371391007 $206.00
371391008 $206.00 371391009 $206.00 371391010 $206.00
371391011 $206.00 371391012 $206.00 371391013 $206.00
371391014 $206.00 371391015 $206.00 371391016 $206.00
371391017 $206.00 371391018 $206.00 371391019 $206.00
371391020 $206.00 371391021 $206.00 371391022 $206.00
371391023 $206.00 371391024 $206.00 371391025 $206.00
371391026 $206.00 371391027 $206.00 371391028 $206.00
371391029 $206.00 371391030 $206.00 371391031 $206.00
371392001 $206.00 371392002 $206.00 371392003 $206.00
371392004 $206.00 371392005 $206.00 371392006 $206.00
371400001 $206.00 371400002 $206.00 371400003 $206.00
371400004 $206.00 371400005 $206.00 371400006 $206.00
371400007 $206.00 371400008 $206.00 371400009 $206.00
371400010 $206.00 371400011 $206.00 371400012 $206.00
371400013 $206.00 371400014 $206.00 371400015 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371400016 $206.00 371400017 $206.00 371400018 $206.00
371400019 $206.00 371400020 $206.00 371400021 $206.00
371400022 $206.00 371400023 $206.00 371400024 $206.00
371400025 $206.00 371400026 $206.00 371400027 $206.00
371400028 $206.00 371400029 $206.00 371400030 $206.00
371400031 $206.00 371400032 $206.00 371400033 $206.00
371400034 $206.00 371400035 $206.00 371400036 $206.00
371400037 $206.00 371400038 $206.00 371400039 $206.00
371400040 $206.00 371400041 $206.00 371400042 $206.00
371400043 $206.00 371400044 $206.00 371400045 $206.00
371400046 $206.00 371400047 $206.00 371400048 $206.00
371400049 $206.00 371400050 $206.00 371400051 $206.00
371400052 $206.00 371400053 $206.00 371400054 $206.00
371400055 $206.00 371400056 $206.00 371400057 $206.00
371400058 $206.00 371400059 $206.00 371400060 $206.00
371400061 $206.00 371400062 $206.00 371400063 $206.00
371411001 $206.00 371411002 $206.00 371411003 $206.00
371411004 $206.00 371411005 $206.00 371411006 $206.00
371411007 $206.00 371411008 $206.00 371411009 $206.00
371411010 $206.00 371411011 $206.00 371411012 $206.00
371411013 $206.00 371411014 $206.00 371411015 $206.00
371411016 $206.00 371411017 $206.00 371411018 $206.00
371411019 $206.00 371411020 $206.00 371411021 $206.00
371411022 $206.00 371411023 $206.00 371411024 $206.00
371411025 $206.00 371411026 $206.00 371411027 $206.00
371411028 $206.00 371412001 $206.00 371412002 $206.00
371412003 $206.00 371412004 $206.00 371412005 $206.00
371412006 $206.00 371412007 $206.00 371412008 $206.00
371412009 $206.00 371412010 $206.00 371412011 $206.00
371412012 $206.00 371413001 $206.00 371413002 $206.00
371413003 $206.00 371413004 $206.00 371413005 $206.00
371413006 $206.00 371413007 $206.00 371413008 $206.00
371413009 $206.00 371413010 $206.00 371413011 $206.00
371413012 $206.00 371413013 $206.00 371413014 $206.00
371413015 $206.00 371413016 $206.00 371413017 $206.00
371413018 $206.00 371413019 $206.00 371421001 $206.00
371421002 $206.00 371421003 $206.00 371421004 $206.00
371421005 $206.00 371421006 $206.00 371421007 $206.00
371421008 $206.00 371421009 $206.00 371421010 $206.00
371421012 $206.00 371421013 $206.00 371421014 $206.00
371421015 $206.00 371421016 $206.00 371421017 $206.00
371421018 $206.00 371421019 $206.00 371421020 $206.00
371421021 $206.00 371421022 $206.00 371421023 $206.00
371421024 $206.00 371421025 $206.00 371421026 $206.00
371421027 $206.00 371421028 $206.00 371421029 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371421030 $206.00 371421031 $206.00 371421032 $206.00
371421033 $206.00 371421034 $206.00 371421035 $206.00
371421036 $206.00 371421037 $206.00 371421038 $206.00
371421039 $206.00 371421040 $206.00 371421041 $206.00
371421042 $206.00 371421043 $206.00 371421044 $206.00
371421045 $206.00 371421046 $206.00 371421047 $206.00
371421048 $206.00 371421049 $206.00 371421050 $206.00
371421051 $206.00 371422001 $206.00 371422002 $206.00
371422003 $206.00 371422004 $206.00 371422005 $206.00
371422006 $206.00 371422007 $206.00 371422008 $206.00
371422009 $206.00 371422010 $206.00 371422011 $206.00
371422012 $206.00 371422013 $206.00 371422014 $206.00
371422015 $206.00 371422016 $206.00 371422017 $206.00
371423001 $206.00 371423002 $206.00 371423003 $206.00
371423004 $206.00 371423005 $206.00 371423007 $206.00
371423008 $206.00 371423009 $206.00 371423010 $206.00
371423011 $206.00 371424001 $206.00 371424002 $206.00
371424003 $206.00 371424004 $206.00 371424005 $206.00
371424006 $206.00 371424007 $206.00 371424008 $206.00
371424009 $206.00 371424010 $206.00 371424011 $206.00
371424012 $206.00 371424013 $206.00 371424014 $206.00
371425001 $206.00 371425002 $206.00 371425003 $206.00
371425004 $206.00 371430001 $206.00 371430002 $206.00
371430003 $206.00 371430004 $206.00 371430005 $206.00
371430006 $206.00 371430007 $206.00 371430008 $206.00
371430009 $206.00 371430010 $206.00 371430011 $206.00
371430012 $206.00 371430013 $206.00 371430014 $206.00
371430015 $206.00 371430016 $206.00 371430017 $206.00
371430018 $206.00 371430019 $206.00 371430020 $206.00
371430021 $206.00 371430022 $206.00 371430023 $206.00
371430024 $206.00 371431001 $206.00 371431002 $206.00
371431003 $206.00 371431004 $206.00 371431005 $206.00
371431006 $206.00 371431007 $206.00 371431008 $206.00
371431009 $206.00 371431010 $206.00 371431011 $206.00
371431012 $206.00 371431013 $206.00 371431014 $206.00
371431015 $206.00 371431016 $206.00 371431017 $206.00
371431018 $206.00 371431019 $206.00 371431020 $206.00
371431021 $206.00 371432001 $206.00 371432002 $206.00
371432003 $206.00 371432004 $206.00 371432005 $206.00
371432006 $206.00 371440001 $206.00 371440002 $206.00
371440003 $206.00 371440004 $206.00 371440005 $206.00
371440006 $206.00 371440007 $206.00 371440008 $206.00
371440009 $206.00 371440010 $206.00 371440011 $206.00
371440012 $206.00 371440013 $206.00 371440014 $206.00
371440015 $206.00 371440016 $206.00 371440017 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371440018 $206.00 371440019 $206.00 371440020 $206.00
371440021 $206.00 371440022 $206.00 371440023 $206.00
371440024 $206.00 371440025 $206.00 371440026 $206.00
371440027 $206.00 371441001 $206.00 371441002 $206.00
371441003 $206.00 371441004 $206.00 371441005 $206.00
371441006 $206.00 371441007 $206.00 371441008 $206.00
371441009 $206.00 371441010 $206.00 371441011 $206.00
371441012 $206.00 371441013 $206.00 371441014 $206.00
371441015 $206.00 371441016 $206.00 371441017 $206.00
371441018 $206.00 371441019 $206.00 371441020 $206.00
371441021 $206.00 371441022 $206.00 371441023 $206.00
371441024 $206.00 371442001 $206.00 371442002 $206.00
371442003 $206.00 371442004 $206.00 371442005 $206.00
371442006 $206.00 371442007 $206.00 371442008 $206.00
371442009 $206.00 371442010 $206.00 371442011 $206.00
371442012 $206.00 371442013 $206.00 371442014 $206.00
371450001 $206.00 371450002 $206.00 371450003 $206.00
371450004 $206.00 371450005 $206.00 371450006 $206.00
371451001 $206.00 371451002 $206.00 371451003 $206.00
371451004 $206.00 371451005 $206.00 371451006 $206.00
371451007 $206.00 371451008 $206.00 371451009 $206.00
371451010 $206.00 371451011 $206.00 371451012 $206.00
371452001 $206.00 371452002 $206.00 371452003 $206.00
371452004 $206.00 371452005 $206.00 371452006 $206.00
371452007 $206.00 371452008 $206.00 371452009 $206.00
371452010 $206.00 371452011 $206.00 371452012 $206.00
371453001 $206.00 371453002 $206.00 371453003 $206.00
371453004 $206.00 371453005 $206.00 371453006 $206.00
371453007 $206.00 371453008 $206.00 371453009 $206.00
371453010 $206.00 371453011 $206.00 371453012 $206.00
371453013 $206.00 371453014 $206.00 371453015 $206.00
371453016 $206.00 371453017 $206.00 371453018 $206.00
371453019 $206.00 371453020 $206.00 371453021 $206.00
371453022 $206.00 371453023 $206.00 371453024 $206.00
371453025 $206.00 371453026 $206.00 371453027 $206.00
371453028 $206.00 371453029 $206.00 371453030 $206.00
371453031 $206.00 371453032 $206.00 371453033 $206.00
371453034 $206.00 371453035 $206.00 371460001 $206.00
371460002 $206.00 371460003 $206.00 371460004 $206.00
371460005 $206.00 371460006 $206.00 371460007 $206.00
371460008 $206.00 371460009 $206.00 371460010 $206.00
371460011 $206.00 371460012 $206.00 371460013 $206.00
371460014 $206.00 371460015 $206.00 371460016 $206.00
371460017 $206.00 371460018 $206.00 371460019 $206.00
371460020 $206.00 371460021 $206.00 371460022 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371460023 $206.00 371460024 $206.00 371460025 $206.00
371460026 $206.00 371460027 $206.00 371460028 $206.00
371460029 $206.00 371460033 $206.00 371460034 $206.00
371460035 $206.00 371460036 $206.00 371460037 $206.00
371460038 $206.00 371460039 $206.00 371460040 $206.00
371461001 $206.00 371461002 $206.00 371461003 $206.00
371461004 $206.00 371461005 $206.00 371461006 $206.00
371461007 $206.00 371461008 $206.00 371461009 $206.00
371461010 $206.00 371461011 $206.00 371461012 $206.00
371461013 $206.00 371461014 $206.00 371461015 $206.00
371462001 $206.00 371462002 $206.00 371462003 $206.00
371462004 $206.00 371462005 $206.00 371470001 $206.00
371470002 $206.00 371470003 $206.00 371470004 $206.00
371470005 $206.00 371470006 $206.00 371470007 $206.00
371470008 $206.00 371470009 $206.00 371470010 $206.00
371470011 $206.00 371470012 $206.00 371470013 $206.00
371470014 $206.00 371470015 $206.00 371470016 $206.00
371470017 $206.00 371471001 $206.00 371471002 $206.00
371471003 $206.00 371471004 $206.00 371471005 $206.00
371471006 $206.00 371471007 $206.00 371471008 $206.00
371471009 $206.00 371471010 $206.00 371471011 $206.00
371471012 $206.00 371471015 $206.00 371471016 $206.00
371471017 $206.00 371471018 $206.00 371471019 $206.00
371471020 $206.00 371471021 $206.00 371471022 $206.00
371471024 $206.00 371471025 $206.00 371471026 $206.00
371471027 $206.00 371471028 $206.00 371471029 $206.00
371471030 $206.00 371471032 $206.00 371471033 $206.00
371472001 $206.00 371472002 $206.00 371472003 $206.00
371472004 $206.00 371472005 $206.00 371472006 $206.00
371472007 $206.00 371472008 $206.00 371472009 $206.00
371472010 $206.00 371472011 $206.00 371472012 $206.00
371480001 $206.00 371480002 $206.00 371480003 $206.00
371480004 $206.00 371480005 $206.00 371480006 $206.00
371480007 $206.00 371480011 $206.00 371480012 $206.00
371480013 $206.00 371480014 $206.00 371480015 $206.00
371480016 $206.00 371480017 $206.00 371481001 $206.00
371481002 $206.00 371481003 $206.00 371481004 $206.00
371481005 $206.00 371481006 $206.00 371481007 $206.00
371481008 $206.00 371481009 $206.00 371481010 $206.00
371481013 $206.00 371481014 $206.00 371481015 $206.00
371481016 $206.00 371481017 $206.00 371481018 $206.00
371481019 $206.00 371481020 $206.00 371481021 $206.00
371481022 $206.00 371481023 $206.00 371481024 $206.00
371482001 $206.00 371482002 $206.00 371482003 $206.00
371482004 $206.00 371482005 $206.00 371482006 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371482007 $206.00 371482008 $206.00 371482009 $206.00
371482010 $206.00 371482011 $206.00 371483001 $206.00
371483002 $206.00 371483003 $206.00 371483004 $206.00
371483005 $206.00 371483006 $206.00 371483007 $206.00
371483008 $206.00 371483009 $206.00 371483010 $206.00
371483011 $206.00 371484001 $206.00 371484002 $206.00
371484003 $206.00 371484004 $206.00 371484005 $206.00
371484006 $206.00 371484007 $206.00 371484008 $206.00
371485001 $206.00 371485002 $206.00 371485003 $206.00
371485004 $206.00 371485005 $206.00 371485006 $206.00
371485007 $206.00 371485008 $206.00 371485009 $206.00
371485010 $206.00 371485011 $206.00 371485012 $206.00
371485013 $206.00 371485014 $206.00 371486001 $206.00
371486002 $206.00 371486003 $206.00 371486004 $206.00
371486005 $206.00 371486006 $206.00 371486007 $206.00
371487001 $206.00 371487002 $206.00 371487003 $206.00
371487004 $206.00 371487005 $206.00 371487006 $206.00
371487007 $206.00 371487008 $206.00 371487009 $206.00
371487010 $206.00 371487011 $206.00 371487012 $206.00
371487013 $206.00 371487014 $206.00 371487015 $206.00
371487016 $206.00 371487017 $206.00 371487018 $206.00
371487019 $206.00 371487020 $206.00 371490001 $206.00
371490002 $206.00 371490003 $206.00 371490004 $206.00
371490005 $206.00 371490006 $206.00 371490007 $206.00
371490008 $206.00 371490009 $206.00 371490010 $206.00
371490011 $206.00 371490012 $206.00 371490013 $206.00
371490014 $206.00 371490015 $206.00 371490016 $206.00
371490017 $206.00 371490018 $206.00 371490019 $206.00
371490020 $206.00 371490021 $206.00 371490022 $206.00
371490023 $206.00 371490024 $206.00 371490025 $206.00
371490026 $206.00 371490027 $206.00 371490028 $206.00
371490029 $206.00 371490030 $206.00 371491001 $206.00
371491002 $206.00 371491003 $206.00 371491004 $206.00
371491005 $206.00 371491006 $206.00 371491007 $206.00
371491008 $206.00 371491009 $206.00 371491010 $206.00
371491011 $206.00 371491012 $206.00 371491013 $206.00
371491014 $206.00 371491015 $206.00 371491016 $206.00
371491017 $206.00 371491018 $206.00 371491019 $206.00
371491020 $206.00 371491021 $206.00 371491022 $206.00
371491023 $206.00 371491024 $206.00 371500001 $206.00
371500002 $206.00 371500003 $206.00 371500004 $206.00
371500005 $206.00 371500006 $206.00 371500007 $206.00
371500008 $206.00 371500009 $206.00 371500010 $206.00
371500011 $206.00 371500012 $206.00 371500013 $206.00
371500014 $206.00 371500015 $206.00 371500016 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371500017 $206.00 371500018 $206.00 371500019 $206.00
371500020 $206.00 371500021 $206.00 371500022 $206.00
371500023 $206.00 371500024 $206.00 371500025 $206.00
371501001 $206.00 371501002 $206.00 371501003 $206.00
371501004 $206.00 371501005 $206.00 371501006 $206.00
371501007 $206.00 371501008 $206.00 371501009 $206.00
371501010 $206.00 371501011 $206.00 371501012 $206.00
371501013 $206.00 371501014 $206.00 371501015 $206.00
371501016 $206.00 371501017 $206.00 371501018 $206.00
371501019 $206.00 371501020 $206.00 371501021 $206.00
371501022 $206.00 371501023 $206.00 371501024 $206.00
371501025 $206.00 371502001 $206.00 371502002 $206.00
371502003 $206.00 371502004 $206.00 371502005 $206.00
371502006 $206.00 371502007 $206.00 371502008 $206.00
371502009 $206.00 371502010 $206.00 371502011 $206.00
371502012 $206.00 371502013 $206.00 371502014 $206.00
371502015 $206.00 371502016 $206.00 371502017 $206.00
371502018 $206.00 371502019 $206.00 371502020 $206.00
371502021 $206.00 371502022 $206.00 371502023 $206.00
371502024 $206.00 371502025 $206.00 371510001 $206.00
371510002 $206.00 371510003 $206.00 371510004 $206.00
371510005 $206.00 371510006 $206.00 371510007 $206.00
371510008 $206.00 371510009 $206.00 371510010 $206.00
371510011 $206.00 371510012 $206.00 371510013 $206.00
371510014 $206.00 371510015 $206.00 371510016 $206.00
371510017 $206.00 371510018 $206.00 371510019 $206.00
371510020 $206.00 371510021 $206.00 371511001 $206.00
371511002 $206.00 371511003 $206.00 371511004 $206.00
371511005 $206.00 371511006 $206.00 371511007 $206.00
371511008 $206.00 371511009 $206.00 371511010 $206.00
371511011 $206.00 371511012 $206.00 371511013 $206.00
371511014 $206.00 371511015 $206.00 371511016 $206.00
371511017 $206.00 371511018 $206.00 371511019 $206.00
371511020 $206.00 371512001 $206.00 371512002 $206.00
371512003 $206.00 371512004 $206.00 371512005 $206.00
371512006 $206.00 371512007 $206.00 371512008 $206.00
371512009 $206.00 371512010 $206.00 371512011 $206.00
371512012 $206.00 371512013 $206.00 371512014 $206.00
371512015 $206.00 371512016 $206.00 371512017 $206.00
371520001 $206.00 371520002 $206.00 371520003 $206.00
371520004 $206.00 371520005 $206.00 371520006 $206.00
371520007 $206.00 371520008 $206.00 371520009 $206.00
371520010 $206.00 371520011 $206.00 371520012 $206.00
371520013 $206.00 371520014 $206.00 371520015 $206.00
371520016 $206.00 371520017 $206.00 371520018 $206.00
Engineer's Report
68-8761 - LMD 1 - Zone 11
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
371520019 $206.00 371520020 $206.00 371520021 $206.00
371520022 $206.00 371520023 $206.00 371520024 $206.00
371520025 $206.00 371520026 $206.00 371520027 $206.00
371520028 $206.00 371520029 $206.00 371520030 $206.00
371520031 $206.00 371521001 $206.00 371521002 $206.00
371521003 $206.00 371521004 $206.00 371521005 $206.00
371521006 $206.00 371521007 $206.00 371521008 $206.00
371521009 $206.00 371521010 $206.00 371521011 $206.00
371521012 $206.00 371521013 $206.00 371521014 $206.00
371521015 $206.00 371521016 $206.00 371521017 $206.00
371521018 $206.00 371521019 $206.00 371521020 $206.00
371522001 $206.00 371522002 $206.00 371522003 $206.00
371522004 $206.00 371522005 $206.00 371522006 $206.00
371522007 $206.00 371522008 $206.00 371522009 $206.00
371522010 $206.00 371522011 $206.00 371522012 $206.00
371522013 $206.00 371522014 $206.00 371522015 $206.00
371522016 $206.00 371522017 $206.00 371522018 $206.00
371522019 $206.00 371522020 $206.00 371522021 $206.00
371522022 $206.00 371522023 $206.00 371522024 $206.00
371522025 $206.00 371522026 $206.00
Totals Parcels 1,679 Levy $363,916.36
Engineer's Report
68-8764 - LMD 1 - Zone 14
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
347511048 $108.20 347511049 $108.20 347511050 $108.20
347511051 $108.20 347511052 $108.20 347511053 $108.20
347511054 $108.20 347511055 $108.20 347511056 $108.20
347511057 $108.20 347530001 $108.20 347530002 $108.20
347530003 $108.20 347531002 $108.20 347531003 $108.20
347531004 $108.20 347531005 $108.20 347531006 $108.20
347531007 $108.20 347531008 $108.20 347532001 $108.20
347532002 $108.20 347532003 $108.20 347532004 $108.20
347532005 $108.20 347532006 $108.20 347532007 $108.20
347532008 $108.20 347532009 $108.20 347532010 $108.20
347532011 $108.20 347532012 $108.20 347532013 $108.20
347532014 $108.20 347532015 $108.20 347533001 $108.20
347533002 $108.20 347533003 $108.20 347533004 $108.20
347533005 $108.20 347533006 $108.20 347533007 $108.20
347533008 $108.20 347533009 $108.20 347533010 $108.20
347533011 $108.20 347533012 $108.20 347533013 $108.20
347533014 $108.20 347533015 $108.20 347533016 $108.20
347533017 $108.20 347533018 $108.20 347533019 $108.20
347533020 $108.20 347533021 $108.20 347533022 $108.20
347533023 $108.20 347533024 $108.20 347533025 $108.20
347533026 $108.20 347533027 $108.20 347534001 $108.20
347534002 $108.20 347534003 $108.20 347534004 $108.20
347534005 $108.20 347540003 $108.20 347540004 $108.20
347540005 $108.20 347540006 $108.20 347540007 $108.20
347540008 $108.20 347540009 $108.20 347540010 $108.20
347540011 $108.20 347540012 $108.20 347540013 $108.20
347540014 $108.20 347540015 $108.20 347540016 $108.20
347540017 $108.20 347540018 $108.20 347540019 $108.20
347540020 $108.20 347540021 $108.20 347540022 $108.20
347540023 $108.20 347540024 $108.20 347540025 $108.20
347540026 $108.20 347540027 $108.20 347540028 $108.20
347540029 $108.20 347540030 $108.20 347540031 $108.20
347540032 $108.20 347540033 $108.20 347540034 $108.20
347540035 $108.20 347540036 $108.20 347541001 $108.20
347541002 $108.20 347541003 $108.20 347541004 $108.20
347541005 $108.20 347541006 $108.20 347541007 $108.20
347541008 $108.20 347541009 $108.20 347541010 $108.20
347541011 $108.20 347541012 $108.20 347541013 $108.20
347541014 $108.20 347541015 $108.20 347541016 $108.20
347541017 $108.20 347541018 $108.20 347541019 $108.20
347541020 $108.20 347541021 $108.20 347541022 $108.20
347541023 $108.20 347541024 $108.20 347541025 $108.20
347542001 $108.20 347542002 $108.20 347542003 $108.20
347542004 $108.20 347542005 $108.20 347542006 $108.20
347542007 $108.20 347542008 $108.20 347542009 $108.20
Assessment Roll
Engineer's Report
68-8764 - LMD 1 - Zone 14
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
Assessment Roll
347542010 $108.20 347542011 $108.20 347550001 $108.20
347550002 $108.20 347550003 $108.20 347550004 $108.20
347550005 $108.20 347550006 $108.20 347550007 $108.20
347550008 $108.20 347550009 $108.20 347550010 $108.20
347550011 $108.20 347550012 $108.20 347550013 $108.20
347550014 $108.20 347550015 $108.20 347550016 $108.20
347550017 $108.20 347550018 $108.20 347550019 $108.20
347550020 $108.20 347550021 $108.20 347550022 $108.20
347550023 $108.20 347550024 $108.20 347550025 $108.20
347550026 $108.20 347550027 $108.20 347550028 $108.20
347550029 $108.20 347550030 $108.20 347550031 $108.20
347550032 $108.20 347550033 $108.20 347550034 $108.20
347550035 $108.20 347550036 $108.20 347550037 $108.20
347550038 $108.20 347550039 $108.20 347550040 $108.20
347550041 $108.20 347550042 $108.20 347550043 $108.20
347550044 $108.20 347550045 $108.20 347550046 $108.20
347550047 $108.20 347550048 $108.20 347551001 $108.20
347551002 $108.20 347551003 $108.20
347551004 $108.20 347551005 $108.20
Totals Parcels 190 Levy $20,558.00
Engineer's Report
68-8765 - LMD 1 - Zone 15
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
347590001 $161.92 347590002 $161.92 347590003 $161.92
347590004 $161.92 347590005 $161.92 347590006 $161.92
347590007 $161.92 347590008 $161.92 347590009 $161.92
347590010 $161.92 347590011 $161.92 347590012 $161.92
347590013 $161.92 347590014 $161.92 347590015 $161.92
347590016 $161.92 347590017 $161.92 347590018 $161.92
347590019 $161.92 347590020 $161.92 347590021 $161.92
347590022 $161.92 347590023 $161.92 347590024 $161.92
347590025 $161.92 347590026 $161.92 347590027 $161.92
347590028 $161.92 347590029 $161.92 347590030 $161.92
347590031 $161.92 347590032 $161.92 347590033 $161.92
347590034 $161.92 347590035 $161.92 347590036 $161.92
347590037 $161.92 347590038 $161.92 347590039 $161.92
347590040 $161.92 347590041 $161.92 347590042 $161.92
347590043 $161.92 347590044 $161.92 347590045 $161.92
347590046 $161.92 347590047 $161.92 347590048 $161.92
347590049 $161.92 347590050 $161.92 347590051 $161.92
347590052 $161.92 347590053 $161.92 347590054 $161.92
347590055 $161.92 347590056 $161.92 347590057 $161.92
347590058 $161.92 347590059 $161.92 347590060 $161.92
347590061 $161.92 347590062 $161.92 347590063 $161.92
347590064 $161.92 347590065 $161.92 347590066 $161.92
347590067 $161.92 347590068 $161.92 347590069 $161.92
347590070 $161.92 347590071 $161.92 347590072 $161.92
347590073 $161.92 347590074 $161.92 347590075 $161.92
Totals Parcels 75 Levy $12,144.00
Assessment Roll
Engineer's Report
68-8766 - LMD 1 - Zone 16
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
347120034 $8,061.12 377373011 $1,656.38
Totals Parcels 2 Levy $9,717.50
Assessment Roll
Engineer's Report
68-8767 - LMD 1 - Zone 17
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
349600001 $126.46 349600002 $126.46 349600003 $126.46
349600004 $126.46 349600005 $126.46 349600006 $126.46
349600007 $126.46 349600008 $126.46 349600009 $126.46
349600010 $126.46 349600011 $126.46 349600012 $126.46
349600013 $126.46 349610001 $126.46 349610002 $126.46
349610003 $126.46 349610004 $126.46 349610005 $126.46
349610006 $126.46 349610007 $126.46 349610008 $126.46
349610009 $126.46 349610010 $126.46 349610011 $126.46
349610012 $126.46 349610013 $126.46 349610014 $126.46
349610015 $126.46 349610016 $126.46 349610017 $126.46
349611001 $126.46 349611002 $126.46 349611003 $126.46
349611004 $126.46 349611005 $126.46 349611006 $126.46
349611007 $126.46 349611008 $126.46 349611009 $126.46
349612001 $126.46 349612002 $126.46 349612003 $126.46
349612004 $126.46 349612005 $126.46 349612006 $126.46
349612007 $126.46 349612008 $126.46 349612009 $126.46
349612010 $126.46 349612011 $126.46 349612012 $126.46
349612013 $126.46 349612014 $126.46 349612015 $126.46
349612016 $126.46 349612017 $126.46 349612018 $126.46
349612019 $126.46 349612020 $126.46 349612021 $126.46
Totals Parcels 60 Levy $7,587.60
Assessment Roll
Engineer's Report
68-8768 - LMD 1 - Zone 18
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
394220001 $168.00 394220002 $168.00 394220003 $168.00
394220004 $168.00 394220005 $168.00 394220006 $168.00
394220007 $168.00 394220008 $168.00 394220009 $168.00
394220010 $168.00 394220011 $168.00 394220012 $168.00
394220013 $168.00 394220014 $168.00 394220015 $168.00
394220016 $168.00 394220017 $168.00 394220018 $168.00
394220019 $168.00 394220020 $168.00 394220021 $168.00
394220022 $168.00 394220023 $168.00 394220024 $168.00
394220025 $168.00 394220026 $168.00 394220027 $168.00
394220028 $168.00 394220029 $168.00 394220030 $168.00
394220031 $168.00 394220032 $168.00 394220033 $168.00
394220034 $168.00 394220035 $168.00 394220036 $168.00
394220037 $168.00 394220038 $168.00 394220039 $168.00
394221001 $168.00 394221002 $168.00 394221003 $168.00
394221004 $168.00 394221005 $168.00 394260001 $168.00
394260002 $168.00 394260003 $168.00 394260004 $168.00
394260005 $168.00 394260006 $168.00 394260007 $168.00
394260008 $168.00 394260009 $168.00 394260010 $168.00
394260011 $168.00 394260012 $168.00 394260013 $168.00
394260014 $168.00 394260015 $168.00 394260016 $168.00
394260017 $168.00 394260018 $168.00 394261001 $168.00
394261002 $168.00 394261003 $168.00 394261004 $168.00
394261005 $168.00 394261006 $168.00 394261007 $168.00
394261008 $168.00 394261009 $168.00 394261010 $168.00
394262001 $168.00 394262002 $168.00 394262003 $168.00
394262004 $168.00 394262005 $168.00 394262006 $168.00
394262007 $168.00 394262008 $168.00 394262009 $168.00
394262010 $168.00 394262011 $168.00 394262012 $168.00
394262013 $168.00 394262014 $168.00 394262015 $168.00
394262016 $168.00 394262017 $168.00 394262018 $168.00
394262019 $168.00 394262020 $168.00
394262021 $168.00 394262022 $168.00
Totals Parcels 94 Levy $15,792.00
Assessment Roll
Engineer's Report
68-8769 - LMD 1 - Zone 19
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
394190001 $70.72 394190002 $70.72 394190003 $70.72
394190004 $70.72 394190005 $70.72 394190006 $70.72
394190007 $70.72 394190008 $70.72 394190009 $70.72
394190010 $70.72 394190011 $70.72 394191001 $70.72
394191002 $70.72 394191003 $70.72 394191004 $70.72
394191005 $70.72 394191006 $70.72 394191007 $70.72
394191008 $70.72 394192001 $70.72 394192002 $70.72
394192003 $70.72 394192004 $70.72 394192005 $70.72
394192006 $70.72 394192007 $70.72 394192008 $70.72
394192009 $70.72 394192010 $70.72 394192011 $70.72
394192012 $70.72 394192014 $70.72 394192015 $70.72
394192016 $70.72 394192017 $70.72 394192018 $70.72
394192019 $70.72 394192020 $70.72 394192021 $70.72
394192022 $70.72 394192023 $70.72 394192024 $70.72
394192025 $70.72 394192027 $70.72 394192028 $70.72
394192029 $70.72 394192030 $70.72 394192031 $70.72
394192032 $70.72 394192033 $70.72 394250001 $70.72
394250002 $70.72 394250003 $70.72 394250004 $70.72
394250005 $70.72 394250006 $70.72 394250007 $70.72
394251001 $70.72 394251002 $70.72 394251003 $70.72
394251004 $70.72 394251005 $70.72 394251006 $70.72
394251007 $70.72 394251008 $70.72 394251009 $70.72
394251010 $70.72 394251011 $70.72 394251012 $70.72
394251013 $70.72 394251014 $70.72 394251015 $70.72
394251016 $70.72 394251017 $70.72 394251018 $70.72
394251019 $70.72 394251020 $70.72 394251021 $70.72
394251022 $70.72 394252001 $70.72 394252002 $70.72
394252003 $70.72 394252004 $70.72 394252005 $70.72
394252006 $70.72 394252007 $70.72 394252008 $70.72
394252009 $70.72 394252010 $70.72 394252011 $70.72
394252012 $70.72 394252013 $70.72 394252014 $70.72
394252015 $70.72 394252016 $70.72 394252017 $70.72
394252018 $70.72 394252019 $70.72 394252020 $70.72
394252021 $70.72 394252022 $70.72 394252023 $70.72
394252024 $70.72 394252025 $70.72 394252026 $70.72
Totals Parcels 105 Levy $7,425.60
Assessment Roll
Engineer's Report
68-8770 - LMD 1 - Zone 20
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
363350001 $571.14 363350002 $571.14 363350003 $571.14
363350004 $571.14 363350005 $571.14 363350006 $571.14
363350007 $571.14 363350008 $571.14 363350009 $571.14
363350010 $571.14 363350011 $571.14 363350012 $571.14
363350013 $571.14 363350014 $571.14 363350015 $571.14
363350016 $571.14 363350017 $571.14 363350018 $571.14
363350019 $571.14 363350020 $571.14 363350022 $571.14
363350023 $950.96 363350024 $899.56
Totals Parcels 23 Levy $13,844.46
Assessment Roll
Engineer's Report
68-8771 - LMD 1 - Zone 21
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
379150053 $213.02 379150054 $213.02 379150055 $213.02
379150056 $213.02 379150057 $213.02 379150058 $213.02
379151001 $213.02 379151002 $213.02 379151003 $213.02
379151004 $213.02 379151005 $213.02 379151006 $213.02
379151007 $213.02 379151008 $213.02 379151009 $213.02
379151010 $213.02 379151011 $213.02 379151012 $213.02
379151013 $213.02 379151014 $213.02 379151015 $213.02
379151016 $213.02 379151017 $213.02 379151018 $213.02
379500001 $213.02 379500002 $213.02 379500003 $213.02
379500004 $213.02 379500005 $213.02 379500006 $213.02
379500007 $213.02 379500008 $213.02 379500009 $213.02
379500010 $213.02 379500011 $213.02 379500012 $213.02
379500013 $213.02 379500014 $213.02 379500015 $213.02
379500016 $213.02 379500017 $213.02 379500018 $213.02
379500019 $213.02 379500020 $213.02 379500021 $213.02
379500022 $213.02 379500023 $213.02 379500024 $213.02
379501001 $213.02 379501002 $213.02 379501003 $213.02
379501004 $213.02 379501005 $213.02 379501006 $213.02
379501007 $213.02 379501008 $213.02 379501009 $213.02
379501010 $213.02 379501011 $213.02 379501012 $213.02
379501013 $213.02 379501014 $213.02 379501015 $213.02
379501016 $213.02 379501017 $213.02 379501018 $213.02
379501019 $213.02 379501020 $213.02 379501021 $213.02
379501022 $213.02 379501023 $213.02 379501024 $213.02
379501025 $213.02 379501026 $213.02 379501027 $213.02
379501028 $213.02 379501029 $213.02 379501030 $213.02
379501031 $213.02 379501032 $213.02 379501033 $213.02
Totals Parcels 81 Levy $17,254.62
Assessment Roll
Engineer's Report
68-8772 - LMD 1 - Zone 22
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
377160049 $7,273.84
Totals Parcels 1 Levy $7,273.84
Assessment Roll
Engineer's Report
68-8773 - LMD 1 - Zone 23
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
363164001 $1,257.16 363164003 $1,257.16 363164005 $1,257.16 363164002 $1,257.16 363164004 $1,257.16
Totals Parcels 5 Levy $6,285.80
Assessment Roll
Engineer's Report
68-8774 - LMD 1 - Zone 24
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
394200001 $70.72 394200002 $70.72 394200003 $70.72
394200004 $70.72 394200005 $70.72 394200006 $70.72
394200007 $70.72 394200008 $70.72 394201001 $70.72
394201002 $70.72 394201003 $70.72 394201004 $70.72
394201005 $70.72 394201006 $70.72 394201007 $70.72
394201008 $70.72 394201009 $70.72 394201010 $70.72
394202001 $70.72 394202002 $70.72 394202003 $70.72
394202004 $70.72 394202005 $70.72 394202006 $70.72
394202007 $70.72 394202008 $70.72 394202009 $70.72
394202010 $70.72 394202011 $70.72 394202012 $70.72
394202013 $70.72 394202014 $70.72 394202015 $70.72
394202016 $70.72 394202017 $70.72 394202018 $70.72
394202019 $70.72 394202020 $70.72 394202021 $70.72
394202022 $70.72 394202023 $70.72 394202024 $70.72
394202025 $70.72 394202026 $70.72 394202027 $70.72
394202028 $70.72 394202029 $70.72 394202030 $70.72
394202031 $70.72 394202032 $70.72 394210001 $70.72
394210002 $70.72 394210003 $70.72 394210004 $70.72
394210005 $70.72 394210006 $70.72 394210007 $70.72
394210008 $70.72 394210009 $70.72 394210010 $70.72
394210011 $70.72 394210012 $70.72 394210013 $70.72
394210014 $70.72 394210015 $70.72 394210016 $70.72
394210017 $70.72 394210018 $70.72 394210019 $70.72
394210020 $70.72 394210021 $70.72 394210022 $70.72
394210023 $70.72 394210024 $70.72 394210025 $70.72
394210026 $70.72 394210027 $70.72 394210028 $70.72
394210029 $70.72 394210030 $70.72 394210031 $70.72
394210032 $70.72 394210033 $70.72 394210034 $70.72
394210035 $70.72 394210036 $70.72 394211001 $70.72
394211002 $70.72 394211003 $70.72 394211004 $70.72
394211005 $70.72 394211006 $70.72 394211007 $70.72
394211008 $70.72 394211009 $70.72 394211011 $70.72
394211012 $70.72 394211013 $70.72 394211014 $70.72
394211015 $70.72 394211016 $70.72 394211017 $70.72
394211018 $70.72 394211019 $70.72 394211020 $70.72
394211021 $70.72 394211022 $70.72
Totals Parcels 107 Levy $7,567.04
Assessment Roll
Engineer's Report
68-8775 - LMD 1 - Zone 25
Fiscal Year 2025-26
APN Levy APN Levy APN Levy
377090042 $1,871.00
Totals Parcels 1 Levy $1,871.00
Assessment Roll
Engineer's Report
Appendix B:
District Diagram
·|}þ74
§¨¦215
§¨¦15
1 517
14 20
4 2
3 7
25 6
19 18 22
16 23
24 8
9 21
12 15 5
0 6,000 12,0003,000 Feet
LANDSCAPE MAINTENANCE DISTRICT NO. 1
DISTRICT DIAGRAM
CITY OF LAKE ELSINORE
Legend
LMD Zone
Zone 1
Zone 2
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 12
Zone 14
Zone 15
Zone 16
Zone 17
Zone 18
Zone 19
Zone 20
Zone 21
Zone 22
Zone 23
Zone 24
Zone 25
City Boundary
Ê