EXHIBIT A - PROJECT MAP
SB 821 - SPRING STREET SIDEWALK
IMPROVEMENT PROJECT
LEGEND
PROPOSED SIDEWALK
PROPOSED ADA RAMPS
PROPOSED RETAINING CURB
PROJECT BACKGROUND & PROJECT DESCRIPTION MAP
EXHIBIT A
EXHIBIT B – PROJECT PHOTOS
Looking South – Spring Street Looking South – Spring Street Looking South – Spring Street towards Lakeshore Dr.
Project will begin at the Intersection of Spring and Limited St. Existing rubber pavers are a tripping hazard, wheel chairs and Uneven rubber pavers forces all pedestrians to walk on the Joining an ADA curb ramp. Project will replace rubber pavers strollers currently use the roadway as a path due to the roadwa y. which are a tripping hazard. uneven path.
Looking North– Spring Street Looking Nort h-Spring Street Looking North – Spring Street New sidewalk to join existing ADA ramp, remove rubber pavers. 18” curb and driveway to be replaced with retaining curb and Stone curb to be replaced with curb & gutter and retaining curb residential driveway. to reduce elevation difference.
EXISTING SITE CONDITIONS
EXHIBIT B – PROJECT PHOTOS
Looking South– Spring Street/Limited Street Southwest intersection Looking North-Spring Street/Limited Street north east i ntersection Looking South- Spring Street/Limited Street south east intersection New ADA ramp to correct existing condition New ADA ramp to correct existing condition New ADA ramp to correct e xisting condition Southwest corner Spring Street/Limited Street Spring Street looking towards Limited Street Spring Street looking towards Limited Street Intersection non ADA compliant, propose new ADA ramp. Pr opose curb & gutter and sidewalk, demolish failing retaining walls Spring Street retaining wall is failing. Will grade at 3:1 slope to 3:1 slope to make up grade differential 3:1 slope to make up grade differential make up grade differential.
EXISTING SITE CONDITIONS
SPRING ST.
LIMITED ST.
LIBRARY ST.
LAKESHORE DR.
SB 821
SPRING STREET
SIDEWALK