SUCCESSFUL WHOLE BUILDING DESIGN • A SOLUTION GREA TER THAN THE SUM OF ITS PARTS
REQUEST FOR QUALIFICATIONS FOR
PROFESSIONAL ARCHITECTURAL & ENGINEERING
DESIGN & ANALY SIS ON-CALL SERVICES
CITY OF LAKE ELSINORE
NOVE MBER 5, 2023
November 5, 2023
Shannon Buckley
Assistant City Manager
City of Lake Elsinore
Administrative Services Department
130 South Main Street
Lake E
lsinore, CA 92530
Dear Shannon Buckley:
STK Architecture, Inc. is pleased to submit our qualifications for Architectural Services.
We understand the scope of services for this RFQ to encompass a variety of architectural projects.
Executive Summary
Since our founding in 1969 STK Architecture, Inc. has managed projects for our growing base of over forty Cal- ifornia municipal, County, State and Federal agencies. A substantial majority of these agencies have chosen STK for multiple repeat projects based on successful past performance. STK offers experience in the archi- tectural execution of a wide variety of building types, armed with the latest trends in technology, sustainability, security, and cost-effective construction. STK has proven competency, relevant to the City, in developing the optimum plan to organize, utilize, and operate your projects. STK Architecture is currently executing On-Call and As-Needed agreements with several Southern California jurisdictions.
Project Speci
fic Experience
STK Architecture, Inc. has provided On-Call, Programming, and Concept Design Services for many jurisdic- tions in recent years, including, but not limited to:
1. Riverside County
2. San Bernardino County
3. City of Lake Elsinore
STK guarantees that all contents of this SOQ shall be valid for 120 calendar days. We have planned for deliv- ery of services (25% of workforce power) for City of Lake Elsinore, as needed, for 2023 - 2024.
Sincerely,
G.V. Salts, Architect, NCARB
ST A TEMENT OF EXPERIENCE AND QUALIFICA TIONS
EXPERIENCE, KNOWLEDGE & REPUTATION
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] Scope Description
Provide On-call Architectural & Engineering ser-
vices for the City of Lake Elsinore.
Our understanding of the scope is as follows:
Contracts will be awarded to pre-qualified firms
for capital improvement projects. Municipal de-
sign, conceptual programming, and due diligence
research will be priortized, as will local presence
and public works experience. Projects will be
assigned by The City based on many consider-
ations such as applicable experience and specific
qualifications. The Lake Elsinore design needs in-
clude: Emergency, quick response, investigative
forensics, site information, building information,
conceptual, logistics/ operations, maintenance,
open space, parks, and storage.
Projects will range from renovated tenant im-
provements to ground-up new build projects.
Master agreements will be awarded to the most
qualified firms. Once awarded, selected firms will
be assigned to specific projects on an on-call ba-
sis under the Master Professional Service Agree-
ment. A detailed scope of work will be identified
in a proposal which, once approved, will result in
the issuance of a purchase order.
Some examples of applicable projects include:
• Downtown rehabilitation projects
• Essential services building planning
• Site investigation reports
• Building investigation reports
• City design standards
• Community master planning
• Parks and recreation master planning
• Civic center renewal projects
• Building rehabilitation projects
• Neighborhood rehabilitation projects
• Programming and needs analaysis services
Objectives:
• Provide or re-invent spaces and environ-
ments to accommodate necessary functions
and operations
• Assess needs of Users and Public
• Meet current and future civic needs
• Plan for support facilities for maintenance of
equipment and buildings as necessary
• Plan for supplementary design consider-
ations: utilities, storage, circulation, interface
requirements, future needs
• Accommodate circulation, City ordinances,
design standards, and public access
• Provide space and circulation for outdoor
activities, as required
• Accommodate parking and traffic standards
• Anticipate community technology & utility
needs
• Coordinate environmental considerations
• Consider local, state, and federal guidelines
as applies
• Research climate, geological, weather, and
topographic considerations that will affect the
programming, design, operations, con-
struction, and functionality of the prospective
project sites and buildings.
• 42095 Zevo Dr., Suite A15, Temecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
UNDERSTANDING OF SERVICES TO BE PROVIDED
REQUIRED AND RECOMMENDED SERVICES
WRITTEN DESCRIPTION
HOURLY RATES
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] Provide complete breakdown of hourly rates based on the following yearly increments beginning from date of award. 2023 -2024
2024-2025
2025-2026
2026-2027
2027-2028
Principal $244
Associate $176
Project Manager $153
Senior Draftsperson $108
Junior Draftsperson $91
Administration $6 8
Principal $251
Associate $181
Project Manager $158
Senior Draftsperson $111
Junior Draftsperson $93
Administration $ 70
Principal $259
Associate $187
Project Manager $163
Senior Draftsperson $115
Junior Draftsperson $96
Administration $ 72
Principal $267
Associate $192
Project Manager $168
Senior Draftsperson $118
Junior Draftsperson $99
Administration $ 74
Principal $275
Associate $198
Project Manager $173
Senior Draftsperson $122
Junior Draftsperson $102
Administration $ 77
REFERENCES
PROJECT REFERENCES
Charles Maynard City of Desert Hot Springs
Municipal 1999 Palm Drive
Desert Hot Springs, CA
92240
415.720.2660
[email protected]
Gus Papagolos City of Lake Elsinore
Municipal A&E 184 Main Street
Lake Elsinore, CA 92530
951.764.2417
[email protected]
“The City of Highland has been working
with STK Architecture for many years
with great success. The STK team has
always maintained a professional attitude
while delivering outstanding service.
I would recommend STK Architecture to
anyone looking for an architectural firm.”
Joseph Hughes,
City Manager,
City of Highland
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] Contacts:
Brian Thomas City of Oceanside
Fire Station 602 Civic Center Dr.
Oceanside, CA 92054
760.435.5074
[email protected]
Jim Richardson City of Highland
Civic Variety 27215 Base Line
Municipal A&E Highland, CA 92346
909.864.6861
[email protected]
M. Rene’ Glynn San Bernardino County PMD
On-Call 385 N. Arrowhead Ave.
Municipal Third Floor
San Bernardino, CA 92415
909.771.1223
[email protected]
CONTRACT
EXCEPTIONS AND DISCUSSIONS REGARDING STANDARD AGREEMENT 42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] Exceptions to and Discussions Regarding Standard Contract Agreement:
6. Suspension or Termination
We respectfully request the following consideration:
Add a termination clause for the Architect in the event of non-performance, mali cous intent, or failure of payment on the part of the City .
7. Plans, Reports, Documents
We respectfully request the following consideration:
Architect should be indemnified by the City in the event that the documents are used for purposes or sites not originally intended. A & E cannot be held liable for the use of the plans, specifications and calculations for any purpose other than the original project.
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] 05/08/2023
Cornerstone Specialty Insurance Services, Inc.
14252 Culver Drive, A299
Irvine CA 92604
Tina Cowie
(714) 731-7700 (714) 731-7750
[email protected]
STK ARCHITECTURE INC.
PO Box 910
Temecula CA 92593
Continental Casualty Company 20443
Hartford Casualty Ins Co 29424
Aspen American Insurance Company 43460
23/24 COVERAGES
A
ADDTL INSURED / P&NC
BLNKT WVR OF SUBRO 2025343649 05/25/2023 05/25/2024
1,000,000
1,000,000
10,000
1,000,000
2,000,000
2,000,000
A 2025343649 05/25/2023 05/25/2024
1,000,000
A
10,000
2095603542 05/25/2023 05/25/2024
3,000,000
3,000,000
B Y 72WECAC4AFK 05/25/2023 05/25/2024
1,000,000
1,000,000
1,000,000
C
Professional Liability
Claims Made AAAE100766-04 05/25/2023 05/25/2024
Each Claim $2,000,000
Annual Aggregate $2,000,000
Evidence of coverage in force. Contractual insurance requirements will be addressed at the time the contract is awarded.
FOR PROPOSAL PURPOSES ONLY PLEASE CONTACT
CORNERSTONE SPECIALTY
TO VERIFY COVERAGE IN FORCE
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOSAUTOS ONLY
NON-OWNED
SCHEDULEDOWNED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
LIMITS(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR
CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED
$PREMISES (Ea occurrence)
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
INSURANCE
PROOF OF INSURANCE
STK Architecture, Inc.
42095 Zevo Drive, Suite A15
Temecula, CA 92590
951.296.9110 • [email protected]
STK is a California
“C” Corporation
#953030155,
Established in 1969
Contact:
G.V. Salts COO
Project Architect
License: C22977
FIRM HISTORY
Firm History
STK Architecture Inc., was founded in 1969.
We offer a full range of architectural services
including architectural design, sustainability,
interior design, master planning, and feasibility
studies. Our continued commitment to clients
and their needs has earned us the trust of
valued people and organizations.
Since our founding we have been involved in
a diverse selection of commercial, governmental
and institutional projects for a variety of
established clients.
Our firm is extremely sensitive to strict time-lines,
adherence to budgets, and the needs, opinions
and desires of our Clients.
Experience
Our team has developed professional experience
in many types of facility design, including:
• Master Planning
• Design Standards
• Programming
• Public Safety
• Administration
• Fire Stations
• Essential Services Buildings
• Entertainment Centers
• Libraries
• Multi-Cinema Theaters
• Live Theatres
• Tenant Improvements
• Specialty Retail Facilities
• LEED Building Design
• Commercial Office Buildings
• Administrative Centers
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
ROBERTO RUBINI
STK ARCHITECTURE, INC. RESUME
Role In The Firm:
Lead Design, Associate
Experience:
Since 1990
With STK:
Since 1995
Education:
Bachelor of Architecture
Ricardo Palma University
Lima, Peru, 1990
Mr. Rubini joined STK in 1994. Roberto’s multi-talents, hard work and diligence has made him a valuable asset for STK and our clients.
Roberto possesses a rare combination of creative talent and technical excellence— attributes perfectly suited to successful architectural design. He has a wide variety of design experience from multi-million dollar theatre/entertainment centers to local fire stations.
Roberto is well versed in coordination of construction documents, implementing his outstanding designs and making them reality.
He is the Revit expert at STK, and has taken on the role of teach- er/ mentor for the rest of the staff. Roberto’s strengths are design, document implementation, and rendering.
Relevant Projects:
• Desert Hot Springs City Hall
• Lake Elsinore City Hall and Cultural Center Restoration • Menifee Fire Station
• Kerasotes Entertainment Center, Boston, MA
• Kerasotes Roosevelt Center, Chicago, Il
• Various Urban Center Renewal Design Projects
Roberto’s strengths are
design, document imple-
mentation, and rendering.
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
G. V . SAL TS
STK ARCHITECTURE, INC. RESUME
Mr. Salts joined STK in 1987 as an intern architect and became an owner in 1999.
He has been the principal-in-charge of fire stations and a variety of municipal and public works projects including libraries, governmental buildings, offices and communications facilities.
G.V. has worked with multiple county, city and regional municipalities, as clients, to design and implement their facilities.
Additional work which rounds out his architectural, and master planning experience includes:
• Fire stations
• Libraries
• Community centers
• Administrative offices
• Maintenance facilities
Relevant Projects:
• City Hall, Lake Elsinore, CA
• Launch Pointe, Lake Elsinore, CA
• Home Gardens Multi-Use Center, Riverside County, CA
• City of Highland Master Plan, Highland, CA
Role In The Firm:
Project Architect, COO
Experience:
Since 1984
With STK:
Since 1987
Education:
Bachelor of Architecture
Kansas State University, 1986
Professional Registration:
CA Architect License #C22977
NCARB #63217
G. V . has been the
principal-in-charge of fire
stations and a variety
of municipal and public
works projects.
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
APPLICABLE EXPERIENCE
STATEMENT OF QUALIFICATIONS
Statement of Qualifications:
The STK Team has served several City and County clients on as-needed (on-call) contracts, and have provided A&E services for the design and construction of dozens of civic, essential services, and on-call projects. These Clients have extended multiple and repeat contracts to our team, indicat- ing that the investigative, creative, technical and professional skills necessary to successfully deliver such services are not just adequate, but exemplary.
The average longevity for staff in architectural firms is 18 months. The average longevity of the STK staff is over 10 years; meaning, the people who performed the exemplary services mentioned above, are the very people who will serve you on your projects. The specific experience of our staff is di- rectly applicable and relevant to the City of Lake Elsinore's requirements. Our investigation, design forensics, programming, needs analysis, concept design, and presentation experience is vast and unsurpassed.
STK has conducted business since 1969. Combined, our staff has over 100 years experience pro- viding services for public works clients, and the proposed team has over fifteen years experience providing on-call services. This quantifiable evidence clearly demonstrates that STK has tangible and verifiable experience and knowledge to provide exceptional service for your projects.
Applicable Project Experience
Palm Desert City Hall remodel and rennovation for development ser- vices. Building Investigation report, Programming services, concep- tual design and video presentation.
City of Palm Desert
Launch Pointe outdoor experience and activity development concep- tual design and presentation, building design and presentation, mas- ter planning and presentation.
City of Lake Elsinore
Desert Hot Springs Civic and Municipal rehabilitation and new build- ings City of Desert Hot Springs
Burbank Entertainment Center: Master Plan, civic design, program- ming, movie theatre program, concept, implementation, and executed completion.
City of Burbank and AMC
Theatres Development
Highland 30-acre City multi-use master plan: Community Center, Athletic Center, Therapy Pool, Library, Sports Park, & Corporate Yard -- research, programming, design, and implementation
City of Highland
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
WORK EXPERIENCE
PUBLIC AND MUNICIPAL ON-CALL EXPERIENCE
STK has successfully completed the following projects as part of “on-call” professional ser- vices contracts
Project Completion Date
Glen Helen B-Block Shower Repairs 10/25/2017
Chino Dairy Farm Demolition 12/18/2017
Rialto Ave. Residence Demolition 12/18/2017
SB Probation Tattoo Removal Facility 1/4/2018
John Rains House Museum, Building Evaluation 2/5/2018
Agriculture Weights and Measures 2/15/2018
Lucerne Valley FS #8, Bunk House Addition 4/1/2018
222 Building Remodel 5/31/2018
West Valley Regional Training Center 7/1/2018
Devore Fire Station/ Clearwater Feasibility 7/13/2018
Fire Station #96, Fawnskin, Architectural Schematic Design 8/3/2018 Barstow Probation Building Improvements 9/1/2018
Yucaipa Park Special Event Entry 9/15/2018
Chino Dairy Farm Demolition, Revise Demo Plan 9/30/2018 Glen Helen Gun Range Restrooms 10/15/2018
Rodman Tower Antenna 11/30/2018
Calico Ghost Town, Roof Repairs 12/3/2018
S. #91, Lake Arrowhead, Office, Security Remodel 4/30/2019 John Rains House Museum Vineyard, ADA Restrooms 6/30/2019 Devore Fire Station, Cost Estimate 9/3/2019
F.S. #14, Wrightwood, CA ADA Restroom, Fire Pole 10/1/2019 Baker Fire Station #53, Bedroom & Training Room 12/19/2019 Rancho Cucamonga Modular Bldg. 3/25/2020
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] Project Completion Date
San Bernardino County Museum Basement ADA Ramp 3/12/2020 Chino Airport Sewer Connection 7/1/20
Chino Airport Administration Building, ADA Restroom Upgrade 7/1/2020 Barstow Child Care Parking Lot 8/3/2020
San Bernardino County Museum Handrails 9/1/2020
Chino Airport Hangar Restroom 10/2/2020
San Bernardino County Museum Entry Beautification 11/3/2020 Weights and Measures, Entry Lobby Remodel 11/3/2020
Yucaipa Regional Park, ADA Restrooms 11/3/2020
Yucaipa Regional Park, ADA Fish Platform 11/3/2020
Yucaipa Regional Park, ADA Playground 11/3/2020
Yucaipa Regional Park, Tent Shelter 11/3/2020
Devore Fire Camp 6 Showers & Restrooms 12/4/2020
Fire Station #163 Upland, Bathroom Renovation 1/4/2021
Guasti Regional Park, ADA Upgrade 3/1/2021
Yucaipa Regional Park, ADA Upgrades 4/2/2021
Redlands Museum Climbing Structures 4/2/2021
Ontario Maple Head Start Pre-School, Interior Fencing & Courtyard 4/2/2021 Probation Fontana Secure Parking Lot Expansion 5/4/2021 Gilbert Street Complex, Vehicular Wayfinding 5/20/2021
Rancho Yard New Building Design 8/2/2021
Pre-School Services, Cooley Dr. 8/13/2021
Ontario Maple Head Start Pre-School, Fencing and Gate 1/15/23 West Valley Probation Gun Range HVAC Pending
San Bernardino 20 Fire Station Assessments 10/2022
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
WORK EXPERIENCE
PUBLIC AND MUNICIPAL ON-CALL EXPERIENCE
Project Completion Date
Guasti Fishing Pier, Path of Travel & Picnic Canopy Accessories 2022 Yucaipa Regional Park, Pool ADA Upgrades 5/26/23
Prado Regional Park, Mallard ADA Updates 11/15/22
Rancho Courthouse Water Isolation Valves Pending
SBC Fire Station #226 Pending
Yorba-Salughter Families Adobe Conceptual Design 6/13/22 Prado Regional Park, Gate House Pending
Prado Regional Park, Monument Sign Pending
Glen Helen Regional Park RR Replacements Pending
Glen Helen Regional Park Shelter Replacements 6/23
Yucaipa Regional Park Pool Chlorine System 5/23
Bloomington Fire Station #76 Fencing Pending
Fire Station #302 Carport Pending
Glen Helen Sheriff Training Range Office Pending
Fire Station #305 Pre-Fab Storage Building Pending
Mojave Narrows Campsite ADA Pending
Glen Helen Fishing Dock ADA Pending
Prado Regional Park Lot #7 ADA 4/23
Lake Gregory South Beach ADA 5/23
Prado Regional Park Playground Renovation Pending
157 W. 5th St. Electrical Improvements 6/23
Rancho Courthouse Re-Pipe Project Pending
5 42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] M. Rene Glynn, 909.771.1223, [email protected] SAN BERNARDINO COUNTY PMD, 385 N. Arrowhead Ave., Third Floor, San Bernardino, CA 9241
WORK EXPERIENCE
PUBLIC AND MUNICIPAL ON-CALL EXPERIENCE
PROJECT EXPERIENCE
LAKE ELSINORE TECHNOLOGY CENTER
Above: Retail View
Below: Main Street View
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] Project Details
City of Palm Desert
73-510 Fred W aring Dr, Palm Desert, CA 92260
Contact: Bryant Ismerio, Project Executive
Phone: 951.684.5901 x232
Scope: Remodel Existing City Hall Offices and Lobby
contains Lobby, Restrooms, Offices, Storage, Support
Space
Project Architect: Camille Acton
Project Manager: Jonie Romano
Designer: Camille Acton/ Jonie Romano
Square Footage: 14,051 S.F.
PROJECT EXPERIENCE
PALM DESERT CITY HALL REMODEL
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
Project Details for Burbank Entertainment Center:
16-Plex Theatre Square Footage: 121,143
Shell Retail Space Square Footage: 18,000
Restaurant Square Footage: 20,000
Parking Garage Square Footage: 110,520
PROJECT EXPERIENCE
BURBANK ENTERTAINMENT CENTER
Burbank Entertainment Village
was an exciting and challeng-
ing project for the STK team.
Included in the retail center was
18,000 S.F. of shell retail space,
20,000 S.F. of restaurant, a
3-level 110,520 S.F. parking
garage and a 121,143 S.F.
16-plex theatre (with fit-out),
resulting in a 276,000 S.F. retail/
entertainment hub for the City
of Burbank - a city that revolves
around the entertainment indus-
try. The success of this facility is
paramount to AMC because the
theatres it replaced were among
the highest grossing cinemas in
the country.
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
PROJECT EXPERIENCE
OSIO APARTMENTS/ MIXED-USE COMPLEX
Original problem: The owner wanted signature, affordable housing in a development that would up- grade the neighborhood and become an impetus for civic improvement.
Tasks included: Thorough site analysis, reporting on existing context and exploration of several op- tions, master plan and unit plans.
Solution: The decision was made to maintain the greenbelt and open areas, use efficient plans to maximize density, and introduce a contemporary vocabulary into the otherwise non-descript context of the neighborhood.
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] Project Details for Osio Apartments:
3.31-acre downtown site with 42 housing units, playground, courts, clubhouse and greenbelt
MPE/Commissioning/Dry Utility Engineer, Steven Johnson, PE 412 E. Vanderbilt Way, San Bernardino, CA 92408
Design West Engineering / 909.890.3700
PROJECT MANAGER
ADMINISTRATIVE SERVICES DEPARTMENT
Civil/Survey Engineer / Matt Brudin, PE
1861 W. Redlands Blvd. Redlands, CA 92373
Engineering Resources of Southern California/ 909. 890-1255 Structural Engineer / Shawn Lothrop , S.E., P.E.
27369 Via Industria,Temecula, CA 92590
ISE Structural Engineers / 951.600.0032
Executive Architect - Architecture, Interior Architecture and Cost Estimating Tony Finaldi, Project Architect; Jaisaeng Namvong, Project Manager Roberto Rubini, Designer
STK Architecture, Inc. / 951.296.9110
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected]
CITY OF LAKE ELSINORE
Landscape Architecture / Vince DiDonato
1635 Enterprise Circle North, Suite C, Temecula, CA 92590 Alhambra Group / 951.970.6156
ORGANIZA TIONAL STRUCTURE
WITH SUB-CONTRACTORS
ORGANIZA TIONAL STRUCTURE
STAFF AND AVAILABILITY
Camille Pulliam Acton
President, CEO
Architect
[email protected]
Principal
G.V. Salts
Secretary, COO
Architect
[email protected]
Principal
Tony Finaldi
Vice President, CFO
Architect
[email protected]
Principal LEED
Roberto Rubini
Associate
Designer/PM
Jonie Romano
Intern Architect
Victor Rocha
Intern Architect
Steve Blanding
IT Manager
Shannon Schindler
[email protected]
Financial/Office Mgr
42095 Zevo Dr., Suite A15, T emecula, CA 92590 • 951.296.9110 • www.stkinc.com • [email protected] John Ingram
Intern Architect
Jaisaeng Namvong
Associate
Project Manager
WORKLOAD AND AVAILABILITY
STK staffs each project with the most experienced personnel available based on applicable expertise and project workload. As a matter of course, STK employees collaborate on all build- ing projects, and are prepared to execute virtually any architectural building type. Managing and maintaining staff workloads are, therefore, seamless and efficient. Currently, workload is steady and predictable. Members of this project team are committed for 50% of their time this year. Should we be awarded this contract, it will account for approximately an addi- tional 5% of their time. Our policy is to commit 75% of employee’s time for the year leaving time for additional services, as required. This system ensures proper project staffing and client satisfaction, as demonstrated by our greater than 80% return rate. All staff and consulting engineers are local to southern California.
Intern Architect
Carol Kurti-Greska
LEED