Wheelchair Lift Installation Proposal
GMS Elevator Services, Inc. is pleased to present this proposal for the installation of one (1) wheelchair lift.
Proposal Amount: The total cost for the work outlined herein is Seventy Five Thousand 00/100 Dollars ($75,000.00)], which includes all applicable taxes, freight, and required permits. A 50% deposit in the amount of $37,500.00 is required upon acceptance of this proposal, prior to ordering materials and scheduling the work.
Scope of Work:
Installation of a new “Wheelchair Lift” with “Straight Through” configuration Lower landing door and upper landing gate
Standard powder coat finish and stainless steel hardware Standard compliant platform controls/fixtures
Integrated Battery Backup
Payment Terms: A 50% deposit is required upon approval of this proposal, prior to the ordering of any materials or scheduling of the project.
Please understand that this proposal and pricing is subject to change dependent on the actual scope of work and building conditions. It would be prudent to have an architect determine the exact location of this unit in the building and if the configuration works.
We trust that this proposal meets your requirements. Please feel free to reach out with any questions or if further clarification is needed.
Respectfully submitted,
Remy Rodriguez
GMS Elevator Services, Inc.
Cell (909) 303-0344
WORK BY OTHERS & CLARIFICATIONS
In conjunction with this wheelchair lift project, the following work is required and shall be the sole responsibility of the building ownership if not already existing. GMS Elevator Services, Inc. (GMSEI) shall not be responsible for the completion, coordination, or verification of this work:
1.Wall/Floor Surface Modifications: Any necessary cutting, patching, covering and painting of wall/floor surfaces.
2.Phone Line Installation: Installation of a dedicated phone line to the wheelchair lift or designated location.
3.Electrical Upgrades: Provide and install all new applicable electrical and power requirements including main disconnect and AC power as required to accommodate the installation. Refer to Battery Lowering section below for additional details.
4.Fire Code Compliance: If a sprinkler is present in the overhead of the elevator shaft, installation of a Shunt Trip (if not already installed) may be required by the Los Angeles Department of Building and Safety (LADBS) Fire Authority.
5.Fire Control System Modernization: Repair or modernization of the building’s fire control system to ensure compliance with applicable codes.
6.Lighting and Power Supply: Installation of all new applicable power and lighting requirements as needed for a proper installation.
7.Material Storage: Provision of a dry, secure, and safe area for the storage of elevator materials related to this project.
Failure to complete the above-listed work in a timely manner may result in project delays and additional costs, for which GMSEI shall not be held liable.
CLARIFICATIONS
The wheelchair lift will be installed as detailed specifically in this proposal only. Any device not explicitly mentioned or contained herein is excluded.
Should there be any presence of Asbestos, PCBs or any other contamination, the disposal of such shall be the responsibility of the Owner/Purchaser, not GMSEI.
All work shall be performed during GMSEI’s normal business hours and regular working days. Permits & Inspections: Upon completion of the outlined work, GMSEI will arrange, hold, and pay for DOSH inspections. Any work directly related to this proposal that is cited by the Elevator Inspector will be corrected.
However, due to the DOSH Elevator Unit’s adoption of the ASME A17.1-2004 elevator code, additional inspector- mandated requirements may arise. Such requirements will be quoted separately. Proposal Validity: This proposal is valid for 30 days and is subject to change at any time for any reason.
Fire Life Safety System Completion:
As part of this process, it may be necessary to upgrade your fire life safety system to ensure compatibility with the new equipment. Depending on the specifications of your existing fire life safety system, it may either be compatible with the proposed changes or require modifications. The Owner/Purchaser is responsible for consulting with their current fire life safety vendor to determine the required upgrades.
It is essential that all necessary fire life safety upgrades be completed prior to the finalization of the project. The California State Elevator Division will conduct an inspection before the elevator is returned to service, and the fire life safety system will be the first component evaluated during this inspection.
In order to proceed with final equipment production, the Owner/Purchaser must confirm the completion of all required fire life safety work and provide an estimated completion date to GMS Elevator Services, Inc. Any delay in the completion of the fire life safety upgrades may result in project delays and potential additional costs.
Battery Lowering & Fire Recall Operation (ASME A17.1-2004 Elevator Code):
Where applicable, the following relays are required for proper functionality (additional relays may be required depending on the type of unit being installed):
1.F.R.A. - Bottom floor hall 1st floor relay sends the elevator to an alternate floor.
2.F.R.S. - Top floor hall detector relay sends the elevator to the main floor.
3.H.F.1. - Elevator machine room smoke detector triggers the flashing fire hat and sends the elevator to an alternate floor. (The elevator controller will activate the flashing fire hat.)
4.H.F.2. - Elevator overhead smoke detector (if a sprinkler is present) triggers the flashing fire hat and sends the elevator to the main floor.
5.Battery Lowering Relay: Monitors the heat detector and connects in series with the auxiliary contact in the disconnect switch. This may require a replacement of the disconnect switch.
All requirements listed above must be completed by the Owner/Purchaser in accordance with all applicable regulations.
GMSEI shall not be responsible for any delays or additional costs resulting from non-compliance or failure to complete these requirements.
MODERNIZATION SCHEDULE
1.Equipment Lead Time: Lead time on equipment is approximately 20-24 weeks from the date of contract acceptance. GMS Elevator Services, Inc. (GMSEI) shall not be responsible for any delays due to vendor supply chain issues, factory production schedules, or other circumstances beyond its control.
2.Project Duration: The anticipated duration is approximately two (2) weeks per lift, contingent upon the timely completion of related contractor work, site access availability, and the scheduling of the required State Elevator Division Inspection. Any delays caused by the Owner/Purchaser or third parties may result in additional costs and extended timelines.
3.Work Hours and Access: All work shall be completed during the regular working hours of the elevator trade.
GMSEI must have uninterrupted access to and exclusive use of the lift while work is in progress. Any interruptions or access restrictions imposed by the Owner/Purchaser may result in additional charges and delays.
4.Material Procurement and Storage: GMSEI will make all reasonable efforts to procure materials and fulfill orders in a timely manner. However, no material orders will be placed until GMSEI receives written confirmation from the Owner/Purchaser, including a scheduled completion date for all Fire Life Safety upgrade items. If materials are ordered and the jobsite is not ready, the Owner/Purchaser shall be responsible for accepting delivery and arranging for storage of the equipment. If onsite storage is not available, the Owner/Purchaser shall remain liable for payment of the equipment invoice along with a monthly offsite storage fee, the amount of which shall be determined by GMSEI. Under no circumstances shall GMSEI be held responsible for delays or additional costs resulting from site readiness issues outside its control.
5. Please note that installation start dates are subject to workforce availability and may not correspond with the timeframes outlined above. GMS will provide an estimated start date based on the actual date of proposal acceptance; however, this date is not guaranteed and remains subject to change.
WARRANTY
1 year parts and labor.
Warranty Disclaimer and Limitations: GMS Elevator Services, Inc. warrants that all work shall be performed in a professional and workmanlike manner. All warranty claims are to be between the building and the manufacturer only and not GMS Elevator Services, Inc. This warranty is limited to a period of 12 months from the date of completion. Any defects arising from misuse, modifications by others, or lack of proper maintenance shall void any applicable warranties. No other warranties, express or implied, including but not limited to merchantability or fitness for a particular purpose, shall apply.
PAYMENT TERMS
50% due upon signing of the proposal (order will not be processed until payment is received) 40% due upon delivery and arrival of equipment on-site (payment in full is required before the elevator inspection can be scheduled)
10% due upon completion and final inspection of the elevator
TERMS AND CONDITIONS
1.Compliance with Codes: All work shall be performed in accordance with the requirements set forth by the City of Los Angeles Department of Building and Safety and/or the State of California Division of Industrial Safety, Elevator Division. Should any changes be made to applicable codes after the date of the order, or should any code enforcement authorities issue rulings extending the application of a code, the necessary work and materials required to comply with such changes shall be performed as an addition to the stated contract price.
2.Limitation of Liability: GMS Elevator Services, Inc. assumes no liability for accidents or injuries to persons or property, except those directly resulting from the negligent acts or omissions of GMS Elevator Services, Inc. or its employees. The Owner/Purchaser remains fully responsible for all accidents and/or injuries to persons while using, operating, or being in or around the elevators, hatchways, or related structures. This contract constitutes the final and integrated agreement between the parties and supersedes all prior understandings, representations, warranties, and agreements. Modifications shall only be valid if made in writing and signed by all parties.
3.Force Majeure: GMS Elevator Services, Inc. shall not be held responsible or liable for any loss, damage, detention, or delay caused by events beyond its reasonable control, including but not limited to strikes, lockouts, fires, explosions, theft, lightning, storms, earthquakes, floods, riots, civil commotions, malicious mischief, or acts of God. In no event shall GMS Elevator Services, Inc. be liable for consequential damages.
4.Loss or Damage: The Owner/Purchaser agrees to reimburse GMS Elevator Services, Inc. for any damage or loss to materials or work on the premises due to fire, theft, or other causes not resulting from GMS Elevator Services, Inc.’s negligence.
5.Indemnification Clause: The Owner/Purchaser agrees to indemnify, defend, and hold harmless GMS Elevator Services, Inc., its officers, employees, and agents from and against any and all claims, liabilities, damages, losses, or expenses (including attorney fees) arising out of or resulting from the work performed under this contract, except to the extent caused by the sole negligence of GMS Elevator Services, Inc.
6.Insurance Requirements: The Owner/Purchaser shall maintain adequate general liability and property insurance coverage for the duration of the project. GMS Elevator Services, Inc. shall be listed as an additional insured on any policies related to the worksite.
Proof of such insurance shall be provided upon request.
7.Change Orders and Additional Work: Any modifications, additions, or changes to the scope of work must be documented in a written change order signed by both parties. Additional costs resulting from such changes shall be the responsibility of the Owner/Purchaser.
8.Site Conditions and Hazardous Materials: The Owner/Purchaser shall ensure that the worksite is free of hazardous materials, including but not limited to asbestos, lead paint, or other contaminants. If such materials are discovered, GMS Elevator Services, Inc. shall have the right to stop work until remediation is completed at the Owner/Purchaser’s expense.
9.Dispute Resolution: Any disputes arising out of or relating to this contract shall first be subject to mediation. If mediation fails, the dispute shall be resolved through binding arbitration in the State of California under the rules of the American Arbitration Association. The prevailing party shall be entitled to recover reasonable attorney fees and costs.
10.Governing Law and Venue: This contract shall be governed by and interpreted in accordance with the laws of the State of California. Any legal action related to this contract shall be brought exclusively in the courts of Los Angeles County.
11.Access Requirements: The Owner/Purchaser shall provide uninterrupted access to the elevator for the duration of the work. Any failure to do so may result in additional charges and project delays.
12.Retention of Replaced Materials: GMS Elevator Services, Inc. reserves the right to remove and retain all replaced elevator materials and any new materials not used in construction.
13.Owner/Purchaser Responsibilities: The Owner/Purchaser shall provide necessary electrical connections, cutouts, line switches, phase reversal switches, lightning arresters, or any other requirements to meet local codes. Any structural modifications required to comply with local or state building or electrical codes shall be the sole responsibility of the Owner/Purchaser.
14.Exclusion of Redecoration: GMS Elevator Services, Inc. shall not be responsible for any redecorating, cutting, patching, or modifications required following the completion of work.
15.Retention of Title: All machinery, equipment, and materials furnished remain the personal property of GMS Elevator Services, Inc. until full and final payment has been made. GMS Elevator Services, Inc. retains the right to repossess any unpaid equipment at the Owner/Purchaser’s cost, regardless of its attachment to real property. Interest at 10% per annum shall accrue on all past-due amounts.
16.Overtime Work: Unless otherwise stated, the quoted price is based on work performed during regular working hours. If overtime work is required, additional charges based on GMS Elevator Services, Inc.’s standard overtime rates shall apply.
17.Payment Terms: Payments for partially completed work shall be due monthly, with final payment due upon completion. No final inspections will be scheduled with regulatory authorities until at least 90% of the contract amount, including any change orders, has been paid.
18.Pricing and Contract Approval: This proposal is submitted for prompt acceptance, and prices are subject to change without notice. The contract shall not be binding upon GMS Elevator Services, Inc. unless approved by an executive officer. No salesperson or manager has the authority to bind GMS Elevator Services, Inc. to any contract or agreement.
19.Equipment Ownership: Any equipment purchased by GMS Elevator Services, Inc. for the purpose of this project shall remain the property of GMS Elevator Services, Inc. until such equipment is fully installed and the total payment for the project has been received in full. The Owner/Purchaser agrees not to remove, sell, transfer, or encumber any such equipment before it has been paid for in full and fully installed. GMS Elevator Services, Inc. reserves the right to retake possession of any equipment if payment is not made in accordance with the agreed terms.
20.Ownership of Installed Materials: GMS Elevator Services, Inc. retains ownership of all installed materials and equipment until invoices are paid in full.
21.Contract Termination: Any termination of this contract shall be deemed the fault of the Owner/Purchaser. No refunds shall be issued under any circumstances, and the Owner/Purchaser shall remain responsible for all costs incurred up to the date of termination. Any outstanding balances shall be due immediately upon termination.
By signing below, the undersigned agrees to the terms and conditions outlined in this proposal and authorizes GMS Elevator Services, Inc. to proceed with the work as specified.
Submitted for GMS ELEVATOR SERVICES, INC.
By: Remy Rodriguez
Phone: (909) 599-3904 Phone
Accepted by (Company): ________________________________ Name: _________________________________
Title: __________________________________
Accepted by GMS ELEVATOR SERVICES, INC.
By__________________________________
Date ________________________________
Accepted by Client:
By: ___________________________________
Date __________________________________
THANK YOU FOR CHOOSING GMS ELEVATOR SERVICES, INC.