Exhibit A - Service Rates

Lake Elsinore City Council
October 14, 2025

Document
Exhibit A - Service Rates
Meeting
October 14, 2025
Body
Lake Elsinore City Council
Original file
99 KB
Text extracted from the city's file for reading and search. Open the original on lakeelsinore.primegov.com. That file is the official record.

Task Description UOM GSA Price
4" Rubber Base 4" Rubber Base LF $ 2.44 6" Rubber Base 6" Rubber Base LF $ 2.44 Aggregate Base Application Aggregate Base Application SF $ 2.67 Aggregate Base Removal Aggregate Base Removal SF $ 2.67 Air – Water Separator Services –
Annual Cost per Separator Air – Water Separator Services – Annual Cost per Separator YR $ 1,914.22 Air Compressor Services – Annual
Cost per Air Compressor Air Compressor Services – Annual Cost per Air Compressor YR $ 4,766.64 Air Cooled Chiller Services –
Annual Cost per Chiller Air Cooled Chiller Services – Annual Cost per Chiller YR $ 8,351.39 Application of Additional Finish
Coat Application of Additional Finish Coat SF $ 0.45 Application of Asphalt Application of Asphalt SF $ 12.43 application of boulders application of boulders EA $ 621.39 Application of Carpet Over Pad Application of Carpet Over Pad SY $ 11.72 Application of Carpet Tile Application of Carpet Tile SY $ 11.72 Application of Ceiling Tiles Application of Ceiling Tiles SF $ 7.25 Application of cobble stone Application of cobble stone SF $ 0.89 Application of Concrete Application of Concrete SF $ 44.39 Application of decomposed
granite Application of decomposed granite SF $ 3.56 application of grout application of grout SF $ 3.40 Application of Headerboard Application of Headerboard LF $ 6.21 Application of HVT Application of HVT SF $ 4.53 Application of Infill Application of Infill SF $ 0.53 Application of irrigation Application of irrigation LF $ 3.56 Application of Lamp Lense Application of Lamp Lense EA $ 135.96 Application of Linoleum Application of Linoleum SY $ 30.28 Application of LVT Application of LVT SF $ 3.91 Application of Moisture Barrier Application of Moisture Barrier SF $ 9.06 Application of mulch Application of mulch SF $ 1.77 application of natural plants application of natural plants EA $ 42.33 application of pavers application of pavers SF $ 13.55 application of playground equip application of playground equip HR $ 115.10 Application of Playground Pad Application of Playground Pad SF $ 1.77 Application of Powerbond Carpet Application of Powerbond Carpet SY $ 11.72 Application of ramp Application of ramp SF $ 53.27 Application of replica plants Application of replica plants EA $ 53.27 Application of Retrofit LED Kit Application of Retrofit LED Kit EA $ 453.19 Tiles Application of Rubber Playground Tiles SF $ 23.08 Application of Rubber Tile Application of Rubber Tile SF $ 3.91 Application of sealer Application of sealer SF $ 1.77 Application of seeded rock Application of seeded rock SF $ 12.43 Compound Application of Self-Level Compound SF $ 9.97 Application of Sheet Vinyl Application of Sheet Vinyl SY $ 26.38 application of slurry application of slurry SF $ 0.72 Application of Sound Wall Application of Sound Wall SF $ 39.88 Application of Sports Pad Application of Sports Pad SF $ 1.77 Application of Tackboard Application of Tackboard SF $ 21.75 Application of Thermostats Application of Thermostats EA $ 1,359.59 Application of tree wells Application of tree wells LF $ 13.32 Application of VCT Application of VCT SF $ 2.54 Application of Window Treatment Application of Window Treatment SF $ 50.76 application of woodchips application of woodchips SF $ 1.77 Asphalt saw cut Asphalt saw cut LF $ 17.75 Black Base Mat w/ Structural Spray Black SF $ 6.40 Color Base Mat w/ Structural Spray Color SF $ 6.83 Carpenter Journeyman Carpenter Journeyman HR $ 147.49 Cement Mason Journeyman Cement Mason Journeyman HR $ 147.49 Clear, Grub and Haul Clear, Grub and Haul SF $ 3.10 Concrete Curb Concrete Curb LF $ 62.14 Court Design Service Court Design Service HR $ 271.92 Demo Carpet over Pad Demo Carpet over Pad SY $ 7.82 Demo Ceramic Tile Demo Ceramic Tile SF $ 27.19 5,000sf Demo Existing Wood Flooring < 5,000sf SF $ 11.79 5,000sf Demo Existing Wood Flooring > 5,000sf SF $ 8.15 Tile Demo Glue Down Carpet / Carpet Tile SY $ 6.84 Backed Demo Powerbond Carpet/ Vinyl Backed SY $ 8.80 Demo Rubber Demo Rubber SF $ 3.91 Demo Sheet Vinyl Demo Sheet Vinyl SY $ 26.38 Demo VCT/LVT Demo VCT/LVT SF $ 2.44 Drainage Application Drainage Application LF $ 46.16 Drywall Lather Journeyman Drywall Lather Journeyman HR $ 147.49 Dumpster Service Dumpster Service EA $ 906.40 Area) Excessive Floor Preparation (Bay Area) HR $ 175.71 Excessive Floor Preparation (Sac) Excessive Floor Preparation (Sac) HR $ 136.58 Cal) Excessive Floor Preparation (So Cal) HR $ 115.10 Expediting Service Expediting Service EA $ 1,812.80 Field repairs Field repairs HR $ 115.10 Field Surveyor Service Field Surveyor Service EA $ 725.12 Area) Floor Covering Journeyman (Bay Area) HR $ 175.71 Floor Covering Journeyman (Sac) Floor Covering Journeyman (Sac) HR $ 136.58 Cal) Floor Covering Journeyman (So Cal) HR $ 115.10 Floor Covering Level 1 (Bay Area) Floor Covering Level 1 (Bay Area) HR $ 101.16 Floor Covering Level 1 (Sac) Floor Covering Level 1 (Sac) HR $ 81.16 Floor Covering Level 1 (So Cal) Floor Covering Level 1 (So Cal) HR $ 44.47 Floor Covering Level 2 (Bay Area) Floor Covering Level 2 (Bay Area) HR $ 108.60 Floor Covering Level 2 (Sac) Floor Covering Level 2 (Sac) HR $ 86.71 Floor Covering Level 2 (So Cal) Floor Covering Level 2 (So Cal) HR $ 62.77 Floor Covering Level 3 (Bay Area) Floor Covering Level 3 (Bay Area) HR $ 116.06 Floor Covering Level 3 (Sac) Floor Covering Level 3 (Sac) HR $ 92.25 Floor Covering Level 3 (So Cal) Floor Covering Level 3 (So Cal) HR $ 67.68 Floor Covering Level 4 (Bay Area) Floor Covering Level 4 (Bay Area) HR $ 123.51 Floor Covering Level 4 (Sac) Floor Covering Level 4 (Sac) HR $ 97.83 Floor Covering Level 4 (So Cal) Floor Covering Level 4 (So Cal) HR $ 72.53 Floor Covering Level 5 (Bay Area) Floor Covering Level 5 (Bay Area) HR $ 130.96 Floor Covering Level 5 (Sac) Floor Covering Level 5 (Sac) HR $ 103.31 Floor Covering Level 5 (So Cal) Floor Covering Level 5 (So Cal) HR $ 78.20 Floor Covering Level 6 (Bay Area) Floor Covering Level 6 (Bay Area) HR $ 138.45 Floor Covering Level 6 (Sac) Floor Covering Level 6 (Sac) HR $ 108.89 Floor Covering Level 6 (So Cal) Floor Covering Level 6 (So Cal) HR $ 83.89 Floor Covering Level 7 (Bay Area) Floor Covering Level 7 (Bay Area) HR $ 145.90 Floor Covering Level 7 (Sac) Floor Covering Level 7 (Sac) HR $ 114.44 Floor Covering Level 7 (So Cal) Floor Covering Level 7 (So Cal) HR $ 93.61 Floor Covering Level 8 (Bay Area) Floor Covering Level 8 (Bay Area) HR $ 160.81 Floor Covering Level 8 (Sac) Floor Covering Level 8 (Sac) HR $ 125.51 Floor Covering Level 8 (So Cal) Floor Covering Level 8 (So Cal) HR $ 103.24 Flooring Project Coordinator Flooring Project Coordinator HR $ 149.07 Flooring Project Estimator Flooring Project Estimator HR $ 149.07 Flooring Project Manager Flooring Project Manager HR $ 194.92 Flooring Site Supervisor Flooring Site Supervisor HR $ 171.99 Furniture R&R Furniture R&R HR $ 146.53 GMAX Testing Procedure GMAX Testing Procedure EA $ 3,403.66 Goal Post Application Goal Post Application LF $ 21,304.95 Grind Floor Grind Floor SF $ 7.82 Cost per Heat Exchanger Heat Exchanger Services – Annual Cost per Heat Exchanger YR $ 3,375.32 Heat Weld Heat Weld LF $ 7.82
HVAC Installer

and systems in a similar commercial or public facility HR $ 165.12 HVAC Laborer Two years as an apprentice concentrating on maintenance of electrical/ mechanical equipment HR $ 93.56 HVAC Project Manager

and systems in a similar commercial or public facility. HR $ 187.13 HVAC Technician

systems equipment and systems in a similar commercial or public facility HR $ 132.09 Install Floor Lids Install Floor Lids EA $ 362.56 Install Threshold Install Threshold LF $ 27.19 Install Vent Cove Base Install Vent Cove Base LF $ 27.19 Install Visqueen Vapor Retarder Install Visqueen Vapor Retarder SF $ 0.27 Install Wood Flooring < 5,000sf Install Wood Flooring < 5,000sf SF $ 9.97 Install Wood Flooring > 5,000sf Install Wood Flooring > 5,000sf SF $ 6.35 Install Wood Subfloor < 5,000sf Install Wood Subfloor < 5,000sf SF $ 7.25 Install Wood Subfloor > 5,000sf Install Wood Subfloor > 5,000sf SF $ 4.53 Lift Application of Carpet Tile Lift Application of Carpet Tile SY $ 36.14 Logo Application Logo Application EA $ 12,427.89 Moisture Test Moisture Test EA $ 195.39 Natural Sod Application Natural Sod Application SF $ 1.07 Natural Sod Removal Natural Sod Removal SF $ 1.33 natural Tree - large natural - large EA $ 2,540.20 natural tree - med natural tree - med EA $ 1,693.47 natural tree - small natural tree - small EA $ 846.73 5000sf Oil Base Wood Floor Refinishing < 5000sf SF $ 0.91 5,000sf Oil Base Wood Floor Refinishing > 5,000sf SF $ 0.45 Outside Corner Installation Outside Corner Installation EA $ 48.92 Paint Badminton Court Paint Badminton Court EA $ 1,631.51 Paint Basketball Court Paint Basketball Court EA $ 1,812.80 Paint Custom Graphics/Letters Paint Custom Graphics/Letters HR $ 271.92 Paint Pickleball Court Paint Pickleball Court EA $ 1,268.96 Paint Volleyball Court Paint Volleyball Court EA $ 1,268.96 Paint/Stain Floor Paint/Stain Floor SF $ 1.81 Patch Wood Flooring < 5,000sf Patch Wood Flooring < 5,000sf SF $ 54.39 Patch Wood Flooring > 5,000sf Patch Wood Flooring > 5,000sf SF $ 36.26 Performance Testing Procedure Performance Testing Procedure EA $ 8,429.46 Perimeter pip removal Perimeter pip removal LF $ 7.10 Perimeter saw cut Perimeter saw cut LF $ 17.75 Plasterer Journeyman Plasterer Journeyman HR $ 147.49 Plumber/HVAC/Electrician Plumber/HVAC/Electrician HR $ 175.71 Polyurethane Full Pour Polyurethane Full Pour SF $ 11.98 Polyurethane Sandwich System Polyurethane Sandwich System SF $ 7.55 Poured-In-Place Application Poured-In-Place Application SF $ 14.21 Poured-In-Place Removal Poured-In-Place Removal SF $ 4.44 Poured-In-Place Repair Poured-In-Place Repair EA $ 923.22 Maintenance Premium Synthetic Turf Maintenance EA $ 13,315.60 Quality Control Supervisor Quality Control Supervisor HR $ 170.18 Re-grading base Re-grading base SF $ 2.67 Removal of Degraded Seal Coats Removal of Degraded Seal Coats LF $ 2.18 Removal of Existing Surface Removal of Existing Surface SF $ 2.67 removal of playground equip removal of playground equip HR $ 115.10 Rendering Coordinator Rendering Coordinator HR $ 149.07 Re-Paint Existing Game Lines Re-Paint Existing Game Lines HR $ 163.15 Safety Coordination Manager Safety Coordination Manager HR $ 181.53 5,000sf Sand & Refinish Wood Flooring < 5,000sf SF $ 9.06 5,000sf Sand & Refinish Wood Flooring > 5,000sf SF $ 6.35 scarification scarification SF $ 1.01 Self Cove Self Cove LF $ 15.63
Shim Flooring < 5,000sf Shim Flooring < 5,000sf SF $ 10.88 Shim Flooring > 5,000sf Shim Flooring > 5,000sf SF $ 7.25 Site Assessment Coordinator Site Assessment Coordinator HR $ 171.99 Skim Coat Skim Coat SF $ 1.56
Slab infill < 5,000sf Slab infill < 5,000sf SF $ 5.44 Slab infill > 5,000sf Slab infill > 5,000sf SF $ 3.63 Staking Staking LF $ 3.56
Standard Floor Prep Standard Floor Prep HR $ 146.53 Area) Standard Floor Preparation (Bay Area) HR $ 175.71 Standard Floor Preparation (Sac) Standard Floor Preparation (Sac) HR $ 136.58 Cal) Standard Floor Preparation (So Cal) HR $ 115.10 Maintenance Standard Synthetic Turf Maintenance EA $ 9,587.22 striping -asphalt striping -asphalt LF $ 2.22 Structural Spray Black Structural Spray Black SF $ 4.61 Structural Spray Color Structural Spray Color SF $ 5.06 Substrate Compaction Substrate Compaction SF $ 1.43 Substrate Prep Substrate Prep SF $ 1.77 Surface Preparation for Finish Surface Preparation for Finish SF $ 4.53 Tile Layer Journeyman Tile Layer Journeyman HR $ 147.49 Toilet Removal Toilet Removal HR $ 146.53 Track Maintenance Track Maintenance LF $ 19,529.54 Application Track Surface Complete Application SY $ 62.14 Track Surface Refresh Track Surface Refresh SY $ 35.52 Track Surface Repair Track Surface Repair SY $ 133.16 Track Surface Re-Top Track Surface Re-Top SY $ 44.39 Trenching Trenching LF $ 46.16
Turf Application (Non-Standard) Turf Application (Non-Standard) SF $ 7.10 Turf Application (Standard) Turf Application (Standard) SF $ 5.32 Turf Project Coordinator Turf Project Coordinator HR $ 149.07 Turf Project Estimator Turf Project Estimator HR $ 149.07 Turf Project Manager Turf Project Manager HR $ 194.92 Turf Removal Turf Removal SF $ 1.51 Turf Site Supervisor Turf Site Supervisor HR $ 171.99 Annual Cost per VFD and Pump VFD’s and Pump Services – Annual Cost per VFD and Pump YR $ 8,489.80 Vinyl Transition Strips Vinyl Transition Strips LF $ 2.44 Refinishing < 5000sf Water Base Wood Floor Refinishing < 5000sf SF $ 1.17 Refinishing > 5,000sf Water Base Wood Floor Refinishing > 5,000sf SF $ 0.82 Chiller Services – Annual Cost per Water Cooled Magnetic Bearing Chiller Services – Annual Cost per Chiller YR $ 10,264.43 Centrifugal Chiller Services – Water Cooled Screw and Centrifugal Chiller Services – Annual Cost per Chiller YR $ 10,299.93