Cotter Construction ESTIMATE
EST0388
Inc
DATE
Andrew Cotter
08/04/2025
Business Number 951-833-
7842 TOTAL
COTTER General Engineering Contractor USD $199,825.40
Bonathuchore
Lic#1046653
Lie qunaus
951-833-7842 Canyon Lake CA
DIR PW-LR-1000980254
cotter-construcion.com
cotter-
[email protected]
TO
City of Lake Elsinore
Street improvement plans for Summerhill drive median
• 9516098377
[email protected]

DESCRIPTION RATE QTY AMOUNT
Sawcut existing pavement $3.00 3,755 Sqft $11,265.00
Grind and overlay existing pavement 0.20 min $8.40 1,671 Sqft $14,036.40 Construct 6 inch curb per standard $58.00 606 Lineal ft $35,148.00 Remove and dispose existing pavement $6.00 4,296 Sq ft $25,776.00 Remove and dispose existing median curb $15.00 286 Lineal ft $4,290.00 Construct 6 " AC $15.00 3,755 Sq ft $56,325.00
Adjust existing manhole to finish grade $1,000.00 1 $1,000.00 Install stamped colored concrete median per standard $5,000.00 3 Median $15,000.00 Signing and striping per approved plans $0.00 1 $0.00

RATE QTY AMOUNT

DESCRIPTION
$18.00 204 $3,672.00
Thermoplastic 8" white channelizing per caltrans
Thermoplastic 8" white lane drop marking $21.00 195 $4,095.00 $400.00 3 $1,200.00
Remove and salvage existing sign and post
Install sign. Signs to be provided by city of lake Elsinore $425.00 9 $3,825.00 $300.00 1 $300.00
Replace mast arm sign 1
Thermoplastic 12" solid white limit line $45.00 57 $2,565.00 $28.00 351 $9,828.00
Thermoplastic legend
$7,500.00 1 $7,500.00
Refresh existing striping within improvement area
$4,000.00 1 $4,000.00
Traffic control provided by cotter construction. Any lane guidance and labor provided by cotter construction.

If arrow boards or electronic notification boards are
needed, public works will set up and be responsible for.

TOTAL USD $199,825.40
Estimates valid for 30 days.