City of Lake Elsinore - Gediman Square parking lot
184 S Main St.
Lake Elsinore CA 92530
Level 2 EV Chargers
Notes
• Prevailing Wage
• Proposal does not include permits
EV Panel
• Utilize existing infrastructure and panels
695.00
Provide a Tesla universal wall connector × 6
Property managers, developers and commercial real estate owners can join our growing network of Charging 4,170.00 Partners by offering on-site EV charging. Install Wall Connector as a public or private amenity to benefit from pay-per-use functionality and 24/7 remote monitoring while attracting new and repeat customers with fast EV Features
Up to 44 mi of range added per hour at 11.5 kW / 48 amp output Integrated J1772 adapter to conveniently charge any electric vehicle Auto-sensing handle to open a Tesla charge port
Monitor and manage your charging schedule and usage from the Tesla app Wi-Fi connectivity for over-the-air updates, remote diagnostics and access controls Versatile indoor / outdoor design
Variable amperage configurations depending on installation location Power-share with up to six Wall Connectors
24-foot cable length
275.00
Installation, Commissioning & Field Testing
Trout Electric will complete the following during installation of the EV charger. This quote is based upon all 1,650.00 wiring to be in place before we start.
- Field Validation
- Programming
- Commissioning
- Complete EV simulation
- Field Reporting including site photos
425.00
Provide an EV pedestal
This pedestal supports both single and dual mounted configurations 1,700.00 698.00
Installation of EV pedestal × 4
2,792.00
This includes the concrete footing required.
33,918.00
Installation of circuits
• Install (2) 208/240 volt 60 amp circuits from existing 400A 1PH electrical meter pedestal in landscape area to owners desired parking space locations
• Chargers will be Daisy Chained to utilize existing available infrastructure • Provide conduit and wire from existing electrical meter pedestal to (2) owner designated parking locations • Utilizing Daisy Chain Installation
4,500.00
Engineering
Civil Work 44,070.00
• Concrete Bases for EV Pedestals
• Trenching for conduits
• Striping of standard parking space
• Safety Bollards or Wheel Stops
• Signage
• Blackout or Sandblast existing Striping as required
Exclusions
• EV Charger software, Monitoring, or Monthly Fees
• Proposal is based on existing electrical infrastructure supporting the new EV loads. • Engineer to perform load calculations for submittal and verification to local municipality if permitting • Load management will be required.
• ADA compliance, any additional restriping of the parking spaces, ramps, truncated domes not noted above. • RSA certification
• New Electrical Service for EV Charging Stations
• Restoration of landscaping.
• Demolition of any items except what is called for in quotation. • Contractor reserves the right to adjust the scope of work and estimate if the authority having jurisdiction requires it or site conditions significantly differ from walkthrough.
• Not responsible for pre-existing power conditioning/voltage fluctuation issues. • Permits
• WIFI
Total $92,800.00
Terms and Conditions
By accepting this proposal you agree to our terms and conditions attached below Terms & Conditions_REV112124
Questions & Answers
-
City of Lake Elsinore - Gediman Square parking lot
184 S Main St.
Lake Elsinore CA 92530
Level 2 EV Chargers
Total $92,800.00
Additional comments
Optional
Your order/reference number
Optional
Signature
Draw Type Sign from a touch device =
aw here
• Yes, I Luis Ceja agree to and accept this quote, on October 14, 2025 at 4:25 PM.
Accept Quote
Decline this quote...