TROUT
ELECTRIC
Prepared for Luis Ceja
Email [email protected]
Prepared by Bill Schultze
Trout Electric
Address 2020 lowa ave Suite 102 Riverside CA 92507
Phone 909-952-0047 Website www.troutelectricusa.com
Quote Number 3637 Date March 18, 2025 Expiry Date October 16, 2025 * Download PDF
City of Lake Elsinore - Community Center
310 W Graham Ave
Lake Elsinore, Ca. 92530
Note
Non Prevailing Wage
No Permit or Engineering
Permit and Prevailing Wage options must be clicked below to add to proposal We can add EV chargers by Utilizing Load Sharing
EV Panel
Utilize Existing House Panel with B Phase Stinger Leg
11,589.00
Installation of circuits
Install (2) 240 volt 40 amp circuits from the panel to the desired locations Provide a Tesla universal wall connector 695.00
× 2
Property managers, developers and commercial real estate owners can join our growing network of Charging 1,390.00 Partners by offering on-site EV charging. Install Wall Connector as a public or private amenity to benefit from pay-per-use functionality and 24/7 remote monitoring while attracting new and repeat customers with fast EV Features
Up to 44 mi of range added per hour at 11.5 kW / 48 amp output Integrated J1772 adapter to conveniently charge any electric vehicle Auto-sensing handle to open a Tesla charge port
Monitor and manage your charging schedule and usage from the Tesla app Wi-Fi connectivity for over-the-air updates, remote diagnostics and access controls Versatile indoor / outdoor design
Variable amperage configurations depending on installation location Power-share with up to six Wall Connectors
24-foot cable length
Installation, Commissioning & Field Testing 275.00
Trout Electric will complete the following during installation of the EV charger. This quote is based upon all 550.00 wiring to be in place before we start.
- Field Validation
- Programming
- Commissioning
- Complete EV simulation
- Field Reporting including site photos
Provide an EV pedestal 425.00
× 2
This pedestal supports both single and dual mounted configurations 850.00 Installation of EV pedestal 698.00
× 2
This includes the concrete footing required. 1,396.00
Engineering 3,500.00
AHJ Permits and fees 1,595.00
Not selected
This price includes the following-
-Labor to submit and pick up the permit
-Scheduling the inspection
-Meeting the inspector and receive complete sign off
• * This price is based on average fees your local AHJ may have additional fees on top of this that would be invoiced separately.***
Civil Work 9,607.00
• Asphalt cutting and replacement
• Traffic Safety Plates
• Concrete cutting and replacement
• Trenching
• Concrete Bases for EV Pedestals
• Coring for Conduits
• ADA Striping
• Striping of standard spaces
• Signage
• Blackout or Sandblast existing Striping as required
Prevailing Wage Adder 1,650.00
If Required by the City
Exclusions
• EV Charger software, Monitoring, or Monthly Fees
• Proposal is based on existing electrical infrastructure supporting the new EV loads. • Engineer to perform load calculations for submittal and verification to local municipality if permitting • Load management may be required.
• ADA compliance, any additional ramps, truncated domes not noted above. • RSA certification
• Prevailing Wages
• Restoration of landscaping.
• Demolition of any items except what is called for in quotation. • Contractor reserves the right to adjust the scope of work and estimate if the authority having jurisdiction requires it or site conditions significantly differ from virtual walkthrough.
• Not responsible for pre-existing power conditioning/voltage fluctuation issues. • Safety Bollards or wheel Stops
• Permits
• WIFI
Notes
• Work to be performed during normal business hours 7:00am-5:00pm, Monday-Friday. • Includes site supervision/project management.
• Includes daily housekeeping of trade specific material/debris. • Project scope changes made after the permit has been pulled may result in additional city/engineering/coordination fees. • Pricing is valid for 30 days from date of estimate.
Lead Times (Estimated)
• Charging Stations: N/A
• Switchgear: 24 weeks
• Engineering: 4-5 weeks
• Permitting (AHJ): 4 weeks
• Utility Scope: N/A
• Installation: 7-10 business days
Terms and Conditions
By accepting this proposal you agree to our terms and conditions attached below Terms & Conditions_REV112124
Options selected 0 of 1
Total $30,532.00
Questions & Answers
City of Lake Elsinore - Community Center
310 W Graham Ave
Lake Elsinore, Ca. 92530
Total $30,532.00 (0 of 1 options selected)
Additional comments
Optional
Your order/reference number
Optional
Signature
Draw Type Sign from a touch device a
raw here
• Yes, I Luis Ceja agree to and accept this quote, on October 14, 2025 at 4:24 PM.
Accept Quote
Decline this quote...