Cities Index.
Exhibit C- City Hall Parking Lot Proposal

Lake Elsinore City Council
November 18, 2025

Document
Exhibit C- City Hall Parking Lot Proposal
Meeting
November 18, 2025
Body
Lake Elsinore City Council
Original file
5.5 MB
Text extracted from the city's file for reading and search. Open the original on lakeelsinore.primegov.com. That file is the official record.

TROUT

ELECTRIC
Prepared for Luis Ceja
Email [email protected]
Prepared by Bill Schultze
Trout Electric
Address 2020 lowa ave Suite 102 Riverside CA 92507
Phone 909-952-0047 Website www.troutelectricusa.com
Quote Number 3603 Date March 12, 2025 Expiry Date October 16, 2025 + Download PDF
City of Lake Elsinore - 3/17
City Hall L2 EV
130 S Main St,
Lake Elsinore, CA 92530
Note
Proposal is Non Prevailing
Prevailing Wage adder below as an option (Click on to add to proposal) WIFI will be required
We can provide WIFI as noted in the option below if not provided by city (Click on to add to proposal) 695.00
Provide a Tesla universal wall connector × 4
Property managers, developers and commercial real estate owners can join our growing network of Charging 2,780.00 Partners by offering on-site EV charging. Install Wall Connector as a public or private amenity to benefit from pay-per-use functionality and 24/7 remote monitoring while attracting new and repeat customers with fast EV charging.

Features
Up to 44 mi of range added per hour at 11.5 kW / 48 amp output Integrated J1772 adapter to conveniently charge any electric vehicle Auto-sensing handle to open a Tesla charge port
Monitor and manage your charging schedule and usage from the Tesla app Wi-Fi connectivity for over-the-air updates, remote diagnostics and access controls Versatile indoor / outdoor design
Variable amperage configurations depending on installation location Power-share with up to six Wall Connectors
24-foot cable length
Installation, Commissioning & Field Testing 275.00
x 4
Trout Electric will complete the following during installation of the EV charger. This quote is based upon all 1,100.00 wiring to be in place before we start.
- Field Validation
- Programming
- Commissioning
- Complete EV simulation
- Field Reporting including site photos
Provide an EV pedestal 425.00
This pedestal supports both single and dual mounted configurations 850.00 698.00
Installation of EV pedestal x2
This includes the concrete footing required. 1,396.00
1,950.00
WI-Fi Connection
Not selected
Outdoor CAT6 Cellular Router External Antenna Monthly fees to a cellular connection not included and will need to be obtained
880.00
Prevailing Adder
If required by city
Exclusions
• EV Charger software, Monitoring, or Monthly Fees
• Proposal is based on existing electrical infrastructure supporting the new EV loads.
• Load management may be required.
• ADA compliance, any additional restriping of the parking spaces, ramps, truncated domes not noted above • RSA certification
• New Electrical Service for EV Charging Stations
• Prevailing Wages
• Utility company fees or charges.
• Demolition of any items except what is called for in quotation. • Contractor reserves the right to adjust the scope of work and estimate if the authority having jurisdiction requires it or site conditions significantly differ from virtual walkthrough.
• Not responsible for pre-existing power conditioning/voltage fluctuation issues. • Signage
• Striping
• Safety Bollards
• Concrete Bases
• Engineering or permits
• WIFI
Options selected 0 of 1
Total $7,006.00
Terms and Conditions
By accepting this proposal you agree to our terms and conditions attached below Terms & Conditions_REV112124
Questions & Answers
City of Lake Elsinore - 3/17
City Hall L2 EV
130 S Main St,
Lake Elsinore, CA 92530
Total $7,006.00 (0 of 1 options selected)
Additional comments
Optional
Your order/reference number
Optional
Signature
Draw Type Sign from a touch device
raw here
Yes, I Luis Ceja agree to and accept this quote, on October 14, 2025 at 4:24 PM.

Accept Quote
Decline this quote...

← All documents from this meeting