Submittal Report
LSR-C17-FY24/25-5469-001
FY 24/25
Submittal Details
Program
Local Streets and Roads
Agency
City of Lake Forest
Date Created
05/15/2024
Date Date
Address
100 Civic Center Dr
City
Lake Forest
State
CA
Zip Code
92630
Contact
Naz Mokarram
Contact Title
Principal Civil Engineer
Contact Phone
(949) 461-3490
Contact Email
[email protected]
Avg. Network PCI
77 Measurement Date
6/2022
Support Documentation
Draft Resolution and Project List - Will be brought to City Council meeting June 18th, 2024 for action.
Additional Information
N/A
Project Details
Title Description Location Component
Priority
Status
Est. Schedule Useful
Life
Assem SenateStart Complete Min Max
Street
Resurfacing:
portions of
Lake Forest
from Bake
Pkwy to I-5
Fwy
This project will include: Cost Estimating,
Document Preparation, Pavement Rehab/Repair
(Existing), Project Scope Development |
Resurfacing Design for Lake Forest Drive from
Bake Pkwy to I-5 Fwy
Portions of Lake Forest
from Bake Pkwy to I-5 Fyw
Pre-
Constructio
n and
Constructio
n
In Progress
22/23
02/2023
06/2024
10/2024
06/2025
10 15 68 37
Street
Resurfacing:
Trabuco Road
from
Peachwood to
Bake Parkway
This project will include: Cost Estimating,
Document Preparation, Pavement Rehab/Repair
(Existing), Project Scope Development
Trabuco Road from Peachwood
to Bake Parkway
Pre-
Constructio
n and
Constructio
n
In Progress
22/23
11/2022
06/2024
08/2024
06/2025
10 15 68 37
Road
Rehabilitati
on and
Slurry Seal,
Jeronimo and
Muirlands
This project will include: Pavement Rehab/Repair
(Existing) | Project received an PMRF Grant,
which delayed the start of the project to
accommodate grant funding paperwork processing.
Jeronimo Road from Los
Alisos to Bake Parkway and
Muirlands Road from Los
Alisos to Bake Parkway
Constructio
n
In Progress
22/23
10/2024 10/2025
10 15 68 37
Street
Resurfacing:
portions of
El Toro Rd
from Glenn
Ranch Rd to
I-5
This project will include: Cost Estimating,
Document Preparation, Project Scope Development
Portions of El Toro Rd from
Glenn Ranch Rd to I-5 Fwy
Pre-
Constructio
n
In Progress
22/23
10/2023 10/2024
10 15 68 37
Street
Resurfacing:
portions of
Bake Pkwy
from Rancho
Parkway
South to
South Pointe
Drive
This project will include: Cost Estimating,
Document Preparation, Project Scope Development
Bake Parkway from Rancho
Parkway South to South
Pointe Drive
Pre-
Constructio
n
In Progress
22/23
06/2023 10/2024
10 15 68 37
Street
Resurfacing:
El Toro from
Jeronimo to
Trabuco
This project will include: Cost Estimating,
Document Preparation, Project Scope Development
El Toro Road from Jeronimo
to Trabuco
Pre-
Constructio
n
In Progress
22/23
10/2023 10/2024
10 15 68 37
Annual
Slurry Seal,
Zone A
This project will include: Pavement Rehab/Repair
(Existing) | PS&E started in April 2023.
Non-Arterial Streets Zone
A, the neighborhood between
Jeronimo and I-5 north of
Ridge Route.
Constructio
n
In Progress
22/23
01/2024 07/2024
7 10 68 37
Annual
Slurry Seal,
Zone D
This project will include: Cost Estimating,
Document Preparation, Project Scope Development
| PS&E started in November 2023.
Neighborhood between
Trabuco Rd. and Portola
Parkway, North of Lake
Forest Drive.
Pre-
Constructio
n and
Constructio
n
In Progress
23/24
11/2023
03/2025
08/2024
09/2025
7 10 68 37
Annual
Slurry Seal,
Zone E
This project will include: Cost Estimating,
Document Preparation, Project Scope Development
The neighborhood between
Trabuco Rd. and Portola
Parkway, South of Lake
Forest Drive.
Pre-
Constructio
n
New 24/25
11/2024 11/2025
7 10 68 37