AGENDA

LAKE FOREST CITY COUNCIL
Regular Meeting of the City Council
Tuesday, September 2, 2025
Public Session 6:30 p.m.

City Council Chambers, 100 Civic Center Drive, Lake Forest, California NOTICE: Pursuant to Lake Forest Municipal Code Section 2.04.010, Regular Meetings of the City Council are held the First and Third Tuesday of each month at the hour of 5:30 p.m. for Closed Session matters, if required.

The Public Session of the meeting shall commence at 6:30 p.m. or as soon thereafter as possible. Special Meeting times may be held at a different time and date as listed on the Agenda.

AGENDA DOCUMENT REVIEW: The Agenda and staff reports are available on the Internet at https://www.lakeforestca.gov/en/government/meeting-agendas-and-minutes/meeting-agendas and at the City Clerk’s Office, 100 Civic Center Drive, Lake Forest, California, on the Friday before the meeting on Tuesday.

AGENDA DESCRIPTION: The Agenda descriptions are intended to give notice to members of the public of a general summary of items of business to be transacted or discussed. The listed Recommended Action represents staff’s recommendation. The City Council may take any action which it deems to be appropriate on the agenda item and is not limited in any way by the recommended action.

AGENDA ON SOCIAL MEDIA: This meeting will be streamed through Facebook Live. Comments will not be taken via Facebook Live. The City provides the Facebook Live stream as an additional service to the public.

However, the City cannot guarantee that its network and/or the site will be uninterrupted. The City is not responsible for any interrupted service.

SPECIAL NOTICE REGARDING PUBLIC ACCESS TO THE MEETING AND PUBLIC COMMENT:

PUBLIC PARTICIPATION: In addition to attending in person, members of the public may access the meeting live on our website at https://www.lakeforestca.gov/en/government/meeting-agendas-and-minutes/meeting-agendas.

PUBLIC COMMENT PRIOR TO THE MEETING: Members of the public may submit email comments to [email protected]. Email comments will be uploaded to the agenda packet and made part of the official public record of the meeting and will not be read at the meeting. To ensure staff reviews all comments prior to the City Council meeting, please submit email comments no later than 5:00 p.m. the day of the meeting.

PUBLIC COMMENT: Members of the public may provide comments in-person at the meeting. Public comments will no longer be accepted remotely. Those wishing to provide comments in-person at the meeting will be asked to submit a request to speak to the City Clerk. To ensure prompt distribution to the City Council, members of the public wishing to provide written materials to the City Council should do so prior to the start of the meeting or as close thereto as possible, as time will not be taken during the public comment period to distribute written materials to the City Council.

TRANSLATION SERVICE: Interpreters are available by request to members of the public that prefer to make their public comments in Spanish or Chinese. Requests for a translator need to be received by 8:00 a.m. the Monday before the scheduled City Council meeting. Such requests must be received via email at [email protected]
September 2, 2025 LAKE FOREST CITY COUNCIL AGENDA Page 1 Los intérpretes están disponibles previa solicitud para el público que prefiera hacer sus comentarios públicos en español o chino. Las solicitudes de traductor deben recibirse antes de las 8:00 a. m. del lunes anterior a la reunión programada del Concejo Municipal. Dichas solicitudes deben recibirse por correo electrónico a [email protected]
如果大眾願意用西班牙語或中文發表公開評論,我們可應要求提供口譯服務。需要在預定市議會會議之前的周一
上午 8:00 之前收到翻譯請求。此類請求必須透過電子郵件收到:[email protected] Rúguǒ dàzhòng yuànyì yòng xībānyá yǔ huò zhōngwén fābiǎo gōngkāi pínglùn, wǒmen kě yīng yāoqiú tígōng k ǒuyì fúwù. Xūyào zài yùdìng shì yìhuì huìyì zhīqián de zhōuyī shàngwǔ 8:00 Zhīqián shōu dào fānyì qǐngqiú. Cǐ l èi qǐngqiú bìxū tòuguò diànzǐ yóujiàn shōu dào: [email protected] CALL TO ORDER: 6:30 p.m.

Council Members: Doug Cirbo
Mark Tettemer
Benjamin Yu
Mayor Pro Tem: Robert Pequeño
Mayor: Scott Voigts
City Manager: Debra Rose
City Attorney: Matthew E. Richardson
Acting City Clerk: Thy Merritt
PUBLIC SESSION: 6:30 p.m.

PUBLIC SESSION: At this time, the City Council will convene to consider public matters. Those wishing to address the City Council may submit a completed “Request to Speak” form to the City Clerk prior to City Council action.

INVOCATION: The Invocation will be provided by a representative of the Church of Jesus Christ of Latter-day Saints.

PLEDGE OF ALLEGIANCE: The Pledge of Allegiance to the Flag of our Country to be led by Boy Scout Troop #639.

REPORT FROM STUDENT LIAISON: Report from Ethan Barro, Student Liaison from El Toro High School.

September 2, 2025 LAKE FOREST CITY COUNCIL AGENDA Page 2

1. PROCLAMATION DECLARING SEPTEMBER 2025 AS SERVICE CLUBS MONTH
RECOMMENDED ACTION: Present a proclamation designating September 2025 as "Service Clubs Month."

2. PROCLAMATION DECLARING SEPTEMBER 2025 AS HUNGER ACTION MONTH
RECOMMENDED ACTION: Present a proclamation designating September 2025 as “Hunger Action Month.”

3. PROCLAMATION DECLARING SEPTEMBER 2025 AS WORLD

ALZHEIMER'S AWARENESS MONTH
RECOMMENDED ACTION: Present a proclamation designating September 2025 as "World Alzheimer's Awareness Month."

PUBLIC COMMENTS

Members of the public can submit an e-comment to [email protected] . E-comments will not be read at the meeting.

Members of the public may also provide comments in-person at the meeting. Those wishing to provide comments in-person at the meeting will be asked to submit a request to speak to the City Clerk.

CONSENT CALENDAR (Item Nos. 4 – 8)
All matters listed under the Consent Calendar are considered routine and will be enacted by one vote. There will be no separate discussion of these items unless Members of the City Council, the public, or staff request specific items be removed from the Consent Calendar for separate action.

4. MOTION TO WAIVE READING OF RESOLUTIONS AND ORDINANCES RECOMMENDED ACTION: Said Ordinances and Resolutions which appear on the public agenda shall be determined to have been read by title and further reading waived.

September 2, 2025 LAKE FOREST CITY COUNCIL AGENDA Page 3 PRESENTATIONS (Item Nos. 1 – 3)

MINUTES OF THE REGULAR MEETING OF THE CITY COUNCIL HELD ON AUGUST 19, 2025
RECOMMENDED ACTION: Approve as submitted.

6. NATIONAL PREPAREDNESS MONTH
RECOMMENDED ACTION: Designate September 2025 as National Preparedness Month.

7. ACCEPTANCE OF TOLL BROTHERS IMPROVEMENTS AND RELEASE OF BONDS FOR TRACT 19124
RECOMMENDED ACTION: 1. Accept as complete the tract improvements and monumentation constructed by Toll Brothers West Inc., a Delaware corporation, for Tract 19124. 2. Authorize the City Clerk to release the Subdivision Faithful Performance and Subdivision Labor and Materials Bonds, both in the amount of $176,811.01, and the Subdivision Improvement Monumentation Bond in the amount of $59,250. 3. Authorize the City Clerk to release the Subdivision Improvement Warranty Bond in the amount of $17,681.10 one year after acceptance of the public improvements for Tract 19124 with the concurrence of the Director of Public Works/City Engineer.

8. NOTICE OF COMPLETION FOR NON-ARTERIAL STREETS ASPHALT REPAIRS ZONE D (24S01A)
RECOMMENDED ACTION: 1. Find that LCR, Inc. has completed construction of Non-Arterial Streets Asphalt Repairs Zone D (24S01A). 2.

Approve the Notice of Completion and authorize the Mayor to execute the document on behalf of the City. 3. Authorize City Clerk to submit Notice of Completion for recordation to the Office of the County Recorder of Orange County within fifteen days of the City Council approval, as required by Section 9204 of the California Civil Code. 4. Authorize staff to release any unencumbered retention in accordance with California law.

September 2, 2025 LAKE FOREST CITY COUNCIL AGENDA Page 4

5. DISCUSSION/ACTION ITEMS (Item Nos. 9 – 10)
The following matters are for City Council consideration/discussion/action. Members of the public may have the opportunity to address these items if they wish to do so. Please complete the Request to Speak form and give to the City Clerk.

9. AWARD CONSTRUCTION CONTRACT FOR EL TORO ROAD
CORRIDOR IMPROVEMENTS - A: JERONIMO ROAD WIDENING
PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)
RECOMMENDED ACTION: 1. Approve contract documents for
construction of Jeronimo Road Widening (PW 2019-08), El Toro Road Median Improvements (PW 2020-07), and Trabuco Road Median Improvements (24S09B). 2. Adopt a Resolution entitled, "A RESOLUTION

OF THE CITY COUNCIL OF THE CITY OF LAKE FOREST, CALIFORNIA, AMENDING THE 2025-2032 CAPITAL IMPROVEMENT PLAN;
AMENDING APPROPRIATIONS FOR FISCAL YEAR 2025-26." 3. Award a contract in the amount of $8,364,464 to All American Asphalt, Inc. 4. Reject all other bids received and authorize return of the bid bonds upon receipt of the executed contract documents from All American Asphalt, Inc. 5.

Authorize the Mayor to sign, and the City Clerk to attest the contract with All American Asphalt, Inc.

10. ORDINANCE REGARDING SOLID WASTE CONTINUATION RIGHTS RECOMMENDED ACTION: 1. Conduct a first reading of an Ordinance entitled: AN ORDINANCE OF THE CITY COUNCIL OF LAKE FOREST, CALIFORNIA AMENDING CHAPTER 16.03 OF TITLE 16 OF THE

MUNICIPAL CODE REGARDING CONTINUATION RIGHTS

CITY MANAGER'S REPORT
At this time, the City Manager may comment on agenda and non-agenda items; and report on items of interest to the City Council and community.

September 2, 2025 LAKE FOREST CITY COUNCIL AGENDA Page 5 Council Member Cirbo:

Council Member Tettemer:

Council Member Yu:

Mayor Pro Tem Pequeño:

Mayor Voigts:

September 2, 2025 LAKE FOREST CITY COUNCIL AGENDA Page 6

CITY COUNCIL COMMENTS
At this time, City Council Members may comment on agenda or non-agenda matters. No discussion may take place on any item not appearing on the posted agenda. Council Members may ask a question for clarification, respond to statements made or questions posed by the public, make a brief announcement, or make a brief report on his or her own activities. In addition, the City Council may refer to staff or other resources for factual information, request staff to report back at a subsequent meeting or direct staff to place a matter of business on a future agenda. No action may be taken on non-agenda matters unless authorized by law (Government Code Section 54954.2).

ADJOURNMENT
In compliance with the Americans With Disabilities Act, if you need special assistance to participate in this Meeting, including auxiliary aids or services, you should contact the Office of the City Clerk at (949) 461-3400.

Notification 48 hours prior to the Meeting will enable the City to make reasonable arrangements to assure accessibility to this meeting. The City Council agenda and agenda back-up materials can be obtained from the Office of the City Clerk on the Friday prior to the City Council meeting. Copies of all Agendas, Staff Reports and Supporting Materials can also be found on the City’s website – https://www.lakeforestca.gov/129/Agendas.

Agenda and agenda packets, if requested, will be made available in an appropriate alternative format to persons with a disability as required by the Americans With Disabilities Act. Copies of the agenda are provided at no cost and agenda back-up materials are available at the per page copy cost.

The City of Lake Forest mailing address is City Council Chambers, 100 Civic Center Drive, Lake Forest, California.

Phone: (949) 461-3400. FAX (949) 461-3511
CERTIFICATION: I, Thy Merritt, Acting City Clerk of the City of Lake Forest, California, hereby certify that the foregoing agenda was posted for public review at City Hall on August 28, 2025.

Thy Merritt
Acting City Clerk
September 2, 2025 LAKE FOREST CITY COUNCIL AGENDA Page 7

CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: City Clerk
SUBJECT:

PROCLAMATION DECLARING SEPTEMBER 2025 AS SERVICE CLUBS
MONTH
RECOMMENDED ACTION(S):

Present a proclamation designating September 2025 as "Service Clubs Month." EXECUTIVE SUMMARY:

Service clubs are integral to engaging local communities in charitable work and services and encourage civic engagement by promoting volunteerism. They play a vital role in providing resources and services to various community projects, such as building playgrounds or supporting educational programs. They also provide opportunities for professional and social networking and developing the skills and talents of young people through mentoring, leadership training, and scholarships. Staff recommend presenting a proclamation declaring September 2025 as "Service Clubs Month" to the service clubs in the City of Lake Forest.

FISCAL IMPACT:

There is no fiscal impact associated with the recommended action.

ATTACHMENTS:

Service Clubs Month Proclamation
Initiated By: Thy Merritt, Acting City Clerk
Submitted By: Thy Merritt, Acting City Clerk
Approved By: Debra Rose, City Manager
Item: 1
8 Attachment

Item: 1
9 CITY OF LAKE FOREST PROCLAMATION
Service Clubs Month – September 2025

WHEREAS, service clubs in Lake Forest are organizations that engage in community service, charitable work, and fundraising. These clubs have been an integral part of Lake Forest in many cases for over 100 years and have made significant contributions to the development of our communities; and WHEREAS, service clubs play a vital role in community development by providing resources and services to support local communities. They contribute to various community projects, such as building playgrounds, supporting educational programs, and providing scholarships; and WHEREAS, these clubs engage in various charitable works, such as donating to food banks, homeless shelters, and disaster relief efforts; and
WHEREAS, service clubs provide leadership development opportunities for their members and provide avenues to learn about leadership skills, team building, and communication, assisting them in their personal and professional lives; and
WHEREAS, these clubs offer networking opportunities for members where they can interact with other professionals and community leaders, build relationships, and expand their social and professional networks; and
WHEREAS, service clubs also focus on developing the skills and talents of young people. They provide mentoring, leadership training, and scholarship opportunities for students and organize programs to support underprivileged youth; and
WHEREAS, these clubs encourage civic engagement by promoting volunteering and community service; NOW, THERFORE, the City Council of the City of Lake Forest, California, do hereby proclaim September 2025 as SERVICE CLUBS MONTH in appreciation for all the significant contributions these organizations make to our communities.

_______________________________

SCOTT VOIGTS
Mayor

__________________________
ROBERT PEQUEÑO
Mayor Pro Tem

__________________________

MARK TETTEMER
Council Member

__________________________

DOUG CIRBO
Council Member
__________________________

BENJAMIN YU
Council Member

Item: 1
10 CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: City Clerk
SUBJECT:

PROCLAMATION DECLARING SEPTEMBER 2025 AS HUNGER ACTION
MONTH
RECOMMENDED ACTION(S):

Present a proclamation designating September 2025 as “Hunger Action Month.” EXECUTIVE SUMMARY:

The Orange County Food Bank and Second Harvest Food Bank of Orange County are requesting the City Council support a proclamation declaring the month of September 2025 as “Hunger Action Month” in the City of Lake Forest.

Hunger Action Month is a national effort of Feeding America to raise awareness of the levels of food and nutritional insecurity in our country. Hunger can affect people from all walks of life. Millions of Americans are just one job loss, missed paycheck, or medical emergency away from hunger. A nonprofit organization, Feeding America is a nationwide network of more than 200 food banks that feed the hungry through food pantries, soup kitchens, shelters, and community-based agencies. A representative from Second Harvest Food Bank of Orange County will be in attendance to accept the proclamation.

FISCAL IMPACT:

There is no fiscal impact associated with the recommended action.

ATTACHMENTS:

Hunger Action Month Proclamation
Initiated By: Thy Merritt, Acting City Clerk
Submitted By: Thy Merritt, Acting City Clerk
Approved By: Debra Rose, City Manager
Item: 2
11 Attachment

Item: 2
12 CITY OF LAKE FOREST PROCLAMATION
Hunger Action Month – September 2025

WHEREAS, hunger and poverty are issues of vital concern in California, where more than one in five Californians face food insecurity on a daily basis and do not know where their next meal will come from; and WHEREAS, everyone needs nutritious food to thrive, and people are working hard to provide for themselves and their families— yet over 359,000 individuals, including over 86,000 children, here in Orange County are food insecure; and WHEREAS, the City of Lake Forest of California is committed to taking steps to combat hunger in every part of our community and to provide additional resources that those in the City of Lake Forest need; and WHEREAS, the City of Lake Forest of California is committed to working with the Orange County Hunger Alliance in educating people about the role and importance of food banks and food care in addressing hunger and raising awareness of the need to devote more resources and attention to hunger issues; and WHEREAS, in the first half of 2025, Orange County Food Bank and Second Harvest Food Bank collectively recorded an average of 810,996 individual food distribution visits per month from our community members facing food insecurity; and
WHEREAS, in the first half of 2025, Orange County Food Bank and Second Harvest Food Bank collectively distributed 36,709,298 pounds of food through its partner network of food pantries and other community organizations; and WHEREAS, Abound Food Care helps to facilitate the recovery of over 25 million pounds of excess edible food in Orange County each year, reducing food waste and diverting that food to those who need it; and WHEREAS, the month of September has been designated “Hunger Action Month” in order to bring attention to food insecurity in our communities and to enlist the public in the movement to end hunger by taking action to ensure every community, and everybody in it, has the food they need to thrive; and WHEREAS, food banks and other organizations across the country will host events throughout the month of September to bring awareness and help end food insecurity in our local community; NOW, THERFORE, the City Council of the City of Lake Forest, California, do hereby proclaim September 202 5 as HUNGER ACTION MONTH.

_______________________________

SCOTT VOIGTS
Mayor

__________________________
ROBERT PEQUEÑO
Mayor Pro Tem

__________________________

MARK TETTEMER
Council Member

__________________________

DOUG CIRBO
Council Member
__________________________

BENJAMIN YU
Council Member

Item: 2
13 CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: City Clerk
SUBJECT:

PROCLAMATION DECLARING SEPTEMBER 2025 AS WORLD ALZHEIMER'S

AWARENESS MONTH
RECOMMENDED ACTION(S):

Present a proclamation designating September 2025 as "World Alzheimer's Awareness Month."
EXECUTIVE SUMMARY:

Alzheimer’s disease, a progressive neurodegenerative brain disorder, robs individuals of their moments and leads to progressive mental and physical impairments. Currently, more than 164,000 residents in Orange County and over 6 million Americans are living with Alzheimer’s disease. Alzheimer’s Orange County has been Orange County’s center for Alzheimer’s resources and is dedicated to providing quality care and support services to local residents who are affected by Alzheimer’s disease or another related dementia. They also partner with local researchers to populate clinical trials to help find a cure. Staff recommend presenting a proclamation designating September 2025 as "World Alzheimer's Awareness Month" to an Alzheimer’s Orange County representative.

FISCAL IMPACT:

There is no fiscal impact associated with the recommended action.

ATTACHMENTS:

World Alzheimer's Awareness Month Proclamation
Initiated By: Thy Merritt, Acting City Clerk
Submitted By: Thy Merritt, Acting City Clerk
Approved By: Debra Rose, City Manager
Item: 3
14 Attachment

Item: 3
15 CITY OF LAKE FOREST PROCLAMATION
World Alzheimer’s Awareness Month – September 2025
WHEREAS, the Nation, S tate of C alifornia, and City of Lake F orest observe Wo rld Alzheimer’s Month during the month of September; and
WHEREAS, Alzheimer’s disease, a progressive neurodegenerative brain disorder, tragically robs individuals of their moments and leads to progressive mental and physical impairments; and
WHEREAS, more than 164 ,000 residents in Orange C ounty and over 6 million Americans are currently living with Alzheimer’s disease; and WHEREAS, Alzheimer’s disease is the thir d leading cause of death in Orange County; and
WHEREAS, the mission of Alzheimer's Orange Coun ty is to provide hands- on care and support, information, referrals, education and resources for families in Orange County and surrounding areas who experience memory loss, Alzheimer’s and other dementias.

NOW, THEREFORE, the City Council of the City of Lake Forest, California, do hereby proclaim September 2025 as WORLD ALZHEIMER’S AWARENESS MONTH. _______________________________

SCOTT VOIGTS

Mayor
__________________________
ROBERT PEQUEÑO
Mayor Pro Tem
__________________________

MARK TETTEMER
Council Member
__________________________

DOUG CIRBO
Council Member
__________________________

BENJAMIN YU
Council Member
Item: 3
16 CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: City Clerk
SUBJECT:

MOTION TO WAIVE READING OF RESOLUTIONS AND ORDINANCES
RECOMMENDED ACTION(S):

Said Ordinances and Resolutions which appear on the public agenda shall be determined to have been read by title and further reading waived.

EXECUTIVE SUMMARY:

California Government Code 36934 allows titles of ordinances and resolutions to be waived.

FISCAL IMPACT:

There is minimal fiscal impact associated with the recommended action.

ATTACHMENTS:

None.

Submitted By: Thy Merritt, Acting City Clerk
Approved By: Debra Rose, City Manager
14 Item: 4
17 MINUTES OF A REGULAR MEETING

OF THE CITY COUNCIL OF THE CITY OF LAKE FOREST
The regular meeting of the City Council of the City of Lake Forest held Tuesday, August 19, 2025, at the Lake Forest City Council Chambers, 100 Civic Center Drive, Lake Forest, California, was called to order at 5:30 p.m. with Mayor Voigts absent.

ROLL CALL:

Council Members:

Doug Cirbo
Mark Tettemer
Benjamin Yu
Mayor Pro Tem: Robert Pequeño
Mayor: Scott Voigts (arrived at 6:00 p.m.)

City Manager: Debra Rose
City Attorney: Matthew E. Richardson
Acting City Clerk: Thy Merritt

CLOSED SESSION

1. CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code section 54957.6
Agency Designated Representatives: Mayor and City Manager Unrepresented Employee(s): All Employees
Mayor Voigts arrived to Closed Session at 6:00 p.m.

ACTION: Closed session was conducted.

INVOCATION: The Invocation was provided by Chaplain Jon Fosburg, Orange County Sheriff’s Department.

PLEDGE OF ALLEGIANCE: The Pledge of Allegiance to the Flag of our Country was led by Brownie Troop #2519.

CLOSED SESSION REPORT: City Attorney Richardson had no action to report.

PRESENTATIONS: (Item Nos. 2 – 4)
MOTION: It was moved by Council Member Yu, seconded by Mayor Pro Tem Pequeño, to approve Presentation Item Nos. 2 – 4. The motion was carried by a vote of 5-0.

Item: 5
18 August 19, 2025 LAKE FOREST CITY COUNCIL MEETING MINUTES Page 2 of 7

2. RECOGNITION OF 2025 FOURTH OF JULY PARADE VOLUNTEERS,

SPECIAL GROUPS, SPONSORS, AND AWARD WINNERS
Recreation Manager Hunter provided a presentation. No public comment was offered.

ACTION: 1. The volunteers who helped plan and produce the 2025 Lake Forest 4th of July Parade were recognized. 2. The groups that provided police services, street closures, street cleaning, and ambulatory services were recognized. 3.

The parade sponsors were recognized. 4. Awards to the winning parade entries were presented.

2. RECOGNITION OF ORANGE COUNTY SHERIFF’S DEPARTMENT CRIME

PREVENTION SPECIALIST
City Manager Rose introduced this item and Captain Pultz provided a presentation. No public comment was offered.

ACTION: Orange County Sheriff’s Department Crime Prevention Specialist Brittney Oldham was recognized for seven years of service to the City of Lake Forest.

3. NATIONAL EMERGENCY MANAGEMENT AWARENESS MONTH
Administrative Services Manager De La Paz provided a presentation. No public comment was offered.

ACTION: The Proclamation designating August 2025 as National Emergency Management Awareness Month was approved.

PUBLIC COMMENTS:

Mike Davison expressed concerns with the U.S. Immigration and Customs Enforcement activities in the City.

Girish Rao expressed concerns with e-bike activity at the Sports Park.

Marcel Louis XIV expressed concerns with the approval of the City’s fire hazard severity zone maps and requested updates of Orange County Fire Authority meetings by the City’s appointed representative Council Member Tettemer.

Jay Cost expressed concerns with the U.S. Immigration and Customs Enforcement activities in the City.

Sean Fletcher expressed concerns with e-bike activity at the Sports Park.

Item: 5
19 August 19, 2025 LAKE FOREST CITY COUNCIL MEETING MINUTES Page 3 of 7 Brian McMillan expressed concerns with the Code Enforcement Division and Council’s conduct toward personal services businesses.

Christine Clarke expressed concerns with permitted parking on Malabar Road.

Mark Hermanson expressed concerns with permitted parking on Malabar Road.

Nita Desai expressed concerns with speeding in various locations.

April Josephson expressed concerns with the services provided by Orange County Animal Care.

CONSENT CALENDAR: (Item Nos. 5 – 15)
MOTION: It was moved by Mayor Pro Tem Pequeño, seconded by Council Member Yu, to approve Consent Calendar Item Nos. 5 – 15. The motion was carried by a vote of 5-0.

5. MOTION TO WAIVE READING OF RESOLUTIONS AND ORDINANCES ACTION: Said Ordinances and Resolutions which appeared on the public agenda were determined to have been read by title and further reading was waived.

6. MINUTES OF THE REGULAR MEETING OF THE CITY COUNCIL HELD ON JULY 15, 2025
ACTION: The minutes were approved as submitted.

7. CERTIFICATION OF WARRANT REGISTER
ACTION: The warrant register in the amount of $10,634,905.63 was approved.

8. QUARTERLY TREASURER'S REPORT - QUARTER ENDED JUNE 30, 2025 ACTION: The report was received and filed.

9. SECOND AMENDMENTS TO AGREEMENTS WITH DE NOVO PLANNING GROUP, LSA ASSOCIATES, INC., AND SAGECREST PLANNING AND

ENVIRONMENTAL FOR ON-CALL ENVIRONMENTAL CONSULTING

SERVICES
ACTION: 1. The Second Amendment for Professional On-Call Environmental Consultant Services with De Novo Planning Group (“De Novo”) for On-Call Environmental Consultant Services was approved. 2. The Mayor was authorized to sign, and the City Clerk to attest, the Second Amendment to the Professional Services Agreement with De Novo substantially in the form attached. 3. The Second Amendment for Professional On-Call Environmental Consultant Item: 5
20 August 19, 2025 LAKE FOREST CITY COUNCIL MEETING MINUTES Page 4 of 7 Services with LSA Associates, Inc. (“LSA”) for On-Call Environmental Consultant Services was approved. 4. The Mayor was authorized to sign, and the City Clerk to attest, the Second Amendment to the Professional Services Agreement with LSA substantially in the form attached. 5. The Second Amendment for Professional On-Call Environmental Consultant Services with Sagecrest Planning and Environmental (“Sagecrest”) for On-Call Environmental Consultant Services was approved. 6. The Mayor was authorized to sign, and the City Clerk to attest, the Second Amendment to the Professional Services Agreement with Sagecrest substantially in the form attached.

10. NOTICE OF COMPLETION FOR LAKE FOREST SPORTS PARK SYNTHETIC TURF REPLACEMENT (25P02)
ACTION: 1. FieldTurf USA, Inc. was found to have completed construction of the Lake Forest Sports Park Synthetic Turf Replacement Project (25P02). 2. The Notice of Completion was approved and the Mayor was authorized to execute the document on behalf of the City. 3. The City Clerk was authorized to submit the Notice of Completion for recordation to the Office of the County Recorder of Orange County within fifteen days of the City Council approval, as required by Section 9204 of the California Civil Code.

11. ACCEPTANCE OF TOLL BROTHERS IMPROVEMENTS AND RELEASE OF BONDS FOR TRACT 18142
ACTION: 1. The tract improvements and monumentation constructed by Toll Brothers West, Inc., a Delaware corporation, for Tract 18142 were accepted as complete. 2. The City Clerk was authorized to release the Subdivision Improvement Monumentation Bond in the amount of $23,850.

12. ACCEPTANCE OF TOLL BROTHERS IMPROVEMENTS AND RELEASE OF BONDS FOR TRACT 19125
ACTION: 1. The tract improvements and monumentation constructed by Toll Brothers West Inc., a Delaware corporation, for Tract 19125 were accepted as complete. 2. The City Clerk was authorized to release the Subdivision Faithful Performance and Subdivision Labor and Materials Bonds, both in the amount of $176,811.01, and the Subdivision Improvement Monumentation Bond in the amount of $59,250. 3. The City Clerk was authorized to release the Subdivision Improvement Warranty Bond in the amount of $17,681.10 one year after acceptance of the public improvements for Tract 19125 with the concurrence of the Acting Director of Public Works/City Engineer.

13. ACCEPTANCE OF TOLL BROTHERS IMPROVEMENTS AND RELEASE OF BONDS FOR TRACT 19126
ACTION: 1. The tract improvements and monumentation constructed by Toll Item: 5
21 August 19, 2025 LAKE FOREST CITY COUNCIL MEETING MINUTES Page 5 of 7 Brothers West Inc., a Delaware corporation, for Tract 19126 were accepted as complete. 2. The City Clerk was authorized to release the Subdivision Faithful Performance and Subdivision Labor and Materials Bonds, both in the amount of $229,598.09, and the Subdivision Improvement Monumentation Bond in the amount of $33,750. 3. The City Clerk was authorized to release the Subdivision Improvement Warranty Bond in the amount of $22,959.80 one year after acceptance of the public improvements for Tract 19126 with the concurrence of the Acting Director of Public Works/City Engineer.

14. ACCEPTANCE OF TOLL BROTHERS IMPROVEMENTS AND RELEASE OF BONDS FOR TRACT 19127
ACTION: 1. The tract improvements and monumentation constructed by Toll Brothers West Inc., a Delaware corporation, for Tract 19127 were accepted as complete. 2. The City Clerk was authorized to release the Subdivision Faithful Performance and Subdivision Labor and Materials Bonds, both in the amount of $385,378.89, and the Subdivision Improvement Monumentation Bond in the amount of $45,600. 3. The City Clerk was authorized to release the Subdivision Improvement Warranty Bond in the amount of $38,537.88 one year after acceptance of the public improvements for Tract 19127 with the concurrence of the Director of Public Works/City Engineer.

15. SECOND AMENDMENT TO THE AGREEMENT WITH BRIGHTLIFE DESIGN,

LLC FOR SEASONAL AND YEAR-ROUND LIGHTING SERVICES
ACTION: 1. The Second Amendment to the Agreement with Brightlife Designs, LLC for Seasonal and Year-Round Lighting Services was approved. 2. The Mayor was authorized to sign, and the City Clerk attest, the Second Amendment to the Agreement with Brightlife Designs, Inc, substantially in the form attached.

DISCUSSION/ACTION ITEMS: (Item Nos. 16 – 18)

16. URGENCY ORDINANCE ESTABLISHING A TEMPORARY MORATORIUM ON

MASSAGE ESTABLISHMENTS
City Manager Rose introduced this item and invited Director of Community Development Ackerman to provide a presentation. Brian McMillan offered public comment opposing the ordinance. Council questions were asked and answered.

Mayor Pro Tem Pequeño made a motion to have the moratorium apply only from Muirlands to the 5 freeway. There was no second. Discussion ensued. Council Member Yu made a motion to move staff’s recommendations, with Council Member Tettemer providing a second.

MOTION: It was moved by Council Member Yu, seconded by Council Member Tettemer, to: 1. Find and determine that the proposed urgency ordinance is not a “project” within the meaning of Section 15378 of the State of California Item: 5
22 August 19, 2025 LAKE FOREST CITY COUNCIL MEETING MINUTES Page 6 of 7 Environmental Quality Act (“CEQA”) Guidelines (Title 14 of the California Code of Regulations) and is exempt from the requirements of CEQA under Section 15061(b)(3) of the CEQA Guidelines; and 2. Adopt Urgency Ordinance No. ____, entitled: AN URGENCY ORDINANCE OF THE CITY COUNCIL OF THE

CITY OF LAKE FOREST ESTABLISHING A TEMPORARY MORATORIUM ON

MASSAGE ESTABLISHMENTS PENDING STUDY AND THE PREPARATION OF AN UPDATE TO THE CITY’S MUNICIPAL CODE AND ZONING CODE AND DETERMINING THE ORDINANCE TO BE EXEMPT FROM CEQA. The motion was carried by a vote of 5-0.

17. COMMUNITY SERVICES COMMISSION STIPEND
City Manager Rose introduced this item and invited Assistant to the City Manager Ruelas to provide a presentation. No public comment was offered.

Council questions were asked and answered.

MOTION: It was moved by Mayor Pro Tem Pequeño, seconded by Council Member Tettemer, to: Adopt a Resolution entitled: A RESOLUTION OF THE

CITY COUNCIL OF THE CITY OF LAKE FOREST, CALIFORNIA REGARDING

COMPENSATION RECEIVED BY LAKE FOREST COMMUNITY SERVICES

COMMISSIONERS AND FINDING THE ACTION EXEMPT FROM THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA). The motion was carried by a vote of 5-0.

16. AUTHORIZATION TO PARTNER WITH COUNTY OF ORANGE ON A JOINT

REQUEST FOR PROPOSALS FOR THE GOLF COURSE PROPERTY
City Manager Rose introduced this item and invited Economic Development/Housing Manager Grijalva to provide a presentation. No public comment was offered. Council questions were asked and answered. Mayor Pro Tem Pequeño recommended that nets be considered for the creek bed.

MOTION: It was moved by Mayor Pro Tem Pequeño, seconded by Council Member Yu, to: 1. Authorize a Joint Request for Proposals for the Lake Forest Golf Course and Practice Center Long-Term Ground Lease with the County of Orange utilizing the County of Orange procurement process in lieu of the City’s standard procurement process. 2. Authorize the City Manager to execute all necessary documents related to this action. The motion was carried by a vote of 5-0.

CITY MANAGER'S REPORT: City Manager Rose had nothing further to report.

CITY COUNCIL COMMENTS:

Council Member Cirbo: Council Member Cirbo reported on his attendance at the Concert in the Park, Taste of Lake Forest, AYSO
Item: 5
23 August 19, 2025 LAKE FOREST CITY COUNCIL MEETING MINUTES Page 7 of 7 Meet the Coach event, and the fire awareness pop-up
events at Borrego and Portola Parks. He requested
consensus for presentations by Southern California
Edison and the California Department of Insurance on
current fire mitigation efforts be placed on a future
agenda. Council Member Yu and Mayor Voigts
provided consensus.

Council Member Tettemer: Council Member Tettemer reported on his attendance at an Eagle Scout Court of Honor event, National
Night Out, the El Toro Water District Advisory Board
meeting, State of the County event, and the Taste of
Lake Forest. He thanked staff and the Chamber of
Commerce for their efforts in putting on that event.

Council Member Yu: Council Member Yu had nothing further to report.

Mayor Pro Tem Pequeño: Mayor Pro Tem Pequeño thanked staff for all their hard work. He reported on his attendance at Taste of
Lake Forest, National Night Out, Concert in the Park,
Eagle Scout Court of Honor, the fire awareness pop-
up events at Borrego and Portola Parks, the El Toro
Water District Advisory Board meeting, and the
Saddleback Valley Pop Warner event.

Mayor Voigts: Mayor Voigts reported on his attendance at Taste of Lake Forest and thanked staff and the Chamber of
Commerce for their efforts in putting on that event. He reminded everyone about signing up for the
Community Emergency Response Team.

ADJOURNMENT: The Regular Meeting of the City Council was adjourned at 8:14 p.m.

Respectfully submitted:

APPROVED:

THY MERRITT SCOTT VOIGTS

ACTING CITY CLERK MAYOR
Item: 5
24 CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: Management Services
SUBJECT:

NATIONAL PREPAREDNESS MONTH
RECOMMENDED ACTION(S):

Designate September 2025 as National Preparedness Month.

EXECUTIVE SUMMARY:

National Preparedness Month is observed each September in the United States.

The Department of Homeland Security Federal Emergency Management Agency (“FEMA”) encourages all residents to prepare for emergencies at home and at work. This year the 2025 National Preparedness Month theme is Preparedness Starts at Home. The campaign is urging people to take four key actions to prepare for any disaster they may face:
oKnow the different types of emergencies that could happen and appropriate responses to stay safe.
oMake a family emergency plan.
oBuild an emergency supply kit.
oGet involved in their community by taking action to prepare for emergencies.

Staff recommends the City Council designate September 2025 as “National Preparedness Month” in the City of Lake Forest.

FISCAL IMPACT:

There is no fiscal impact associated with the recommended action.

Initiated By: Sharlyn de la Paz, Administrative Services Manager Submitted By: Sean McGovern, Deputy City Manager
Approved By: Debra Rose, City Manager
Item: 6
25 CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: Public Works
SUBJECT:

ACCEPTANCE OF TOLL BROTHERS IMPROVEMENTS AND RELEASE OF BONDS FOR TRACT 19124
RECOMMENDED ACTION(S):

1. Accept as complete the tract improvements and monumentation constructed by Toll Brothers West Inc., a Delaware corporation, for Tract 19124

2. Authorize the City Clerk to release the Subdivision Faithful Performance and Subdivision Labor and Materials Bonds, both in the amount of $176,811.01, and the Subdivision Improvement Monumentation Bond in the amount of $59,250.

3. Authorize the City Clerk to release the Subdivision Improvement Warranty Bond in the amount of $17,681.10 one year after acceptance of the public improvements for Tract 19124 with the concurrence of the Director of Public Works/City Engineer.

EXECUTIVE SUMMARY:

On August 17, 2021, the City Council approved Final Tract Map No. 19124 (Attachment 1) for a 9-numbered and 28-lettered lot subdivision, and a Subdivision Improvement Agreement with Toll Brothers West, a Delaware corporation (“Toll”). The 9-numbered lots enabled Toll to construct single family residential units (lots 1-5), affordable senior housing (lot 7), parks (lots 6 and 9), and a possible school (lot 8). Subsequent to the approval of tract 19124, the construction of the school did not go forward and lot 8 was converted to an additional single-family residential site. The 28-lettered lots consisted of three for private street purposes, twenty-one for open space/landscape purposes, and four lots for public street purposes. Once the decision was made regarding the school site, the four public streets converted to private streets. The Homeowners Association (“HOA”) will maintain all twenty-eight lettered lots.

In accordance with the agreement, Toll submitted a Subdivision Improvement Faithful Performance Bond and a Subdivision Improvement Labor and Materials Bond, both in the amount of $4,274,906.97 to guarantee construction of the tract improvements. These improvements include the tract backbone streets, curb and Item: 7
26 gutter, sidewalks, streetlights; the backbone storm drain system; improvements on Bake Parkway and Rancho Parkway; and the common open space improvements. The improvements to Bake Parkway and Rancho Parkway are public improvements maintained by the City. The improvements consisted of adding right-turn lanes into the development on both streets. All other improvements are private and will be maintained by the HOA. Toll also submitted a Subdivision Improvement Monumentation Bond in the amount of $42,750 to establish monuments for the tract.

Lastly, Toll submitted a Subdivision Improvement Warranty Bond in the amount of $427,490.68 to guarantee repair or replacement of the tract improvements for defective work for a one-year period after acceptance of the improvements. On March 24, 2025, the City received letters from Toll requesting release of bonds associated with the tract improvements and monumentation for Tract 19124 (Attachment 2). There were several items required of Toll before the City would accept the improvements. These included repairs to concrete and asphalt improvements. Staff determined the tract improvements now comply with the approved plans and are completed to the satisfaction of the Public Works Department. The HOA will maintain all tract improvements.

Toll’s engineer, Hunsaker & Associates, provided a letter dated January 16, 2025, (Attachment 3) stating that all survey monuments required by Tract 19124 were set and that they were paid for the work. Staff recommend the City Council accept the completed improvements and monumentation for Tract 19124 and authorize the release of the Subdivision Improvement Faithful Performance, Subdivision Improvement Labor and Materials, and the Subdivision Improvement Monumentation Bonds. Staff also recommend the City Council authorize the City Clerk to release the Subdivision Improvement Warranty Bond one year after acceptance of the improvements with the concurrence of the Director of Public Works/City Engineer.

FISCAL IMPACT:

There is minimal fiscal impact to the City as the improvements on Bake Parkway and Rancho Parkway are minor and the City is already maintaining both streets.

The HOA will maintain all other improvements.

ATTACHMENTS:

1. Tract Map for Approved Tract 19124

2. Letters From Toll Brothers

3. Letter From Hunsaker & Associates
Item: 7
27 Initiated By: Dennis Jue, Deputy City Engineer
Submitted By: Douglas Erdman, Acting Director of Public Works/City Engineer Approved By: Debra Rose, City Manager
Item: 7
28 Item: 7
29 Item: 7
30 Item: 7
31 Item: 7
32 Item: 7
33 Item: 7
34 Item: 7
35 Item: 7
36 Item: 7
37 Item: 7
38 Item: 7
39 CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: Public Works
SUBJECT:

NOTICE OF COMPLETION FOR NON-ARTERIAL STREETS ASPHALT
REPAIRS ZONE D (24S01A)
RECOMMENDED ACTION(S):

1. Find that LCR Earthwork & Engineering Corp. has completed construction of Asphalt Repairs for Non-Arterial Streets, Zone D (24S01A).

2. Approve the Notice of Completion and authorize the Mayor to execute the document on behalf of the City.

3. Authorize City Clerk to submit Notice of Completion for recordation to the Office of the County Recorder of Orange County within fifteen days of the City Council approval, as required by Section 9204 of the California Civil Code.

4. Authorize staff to release any unencumbered retention in accordance with California law.

EXECUTIVE SUMMARY:

On November 19, 2024, the City Council awarded a contract to LCR Earthwork & Engineering Corp. (“LCR”) in the amount of $2,257,700 to provide pavement repairs within Zone D. Zone D encompasses the residential and commercial areas from Trabuco Road to Portola Parkway between Lake Forest Drive and the City of Irvine boundary. The Project advances the City’s goal of maintaining a “Good” (75 point or more) rating as determined by the biannual Pavement Condition Index (“PCI”) analysis.

The Project began on January 21, 2025. The City Manager authorized Contract Change Order #1 (“CCO #1”), which added $168,556.20 in compensation to the construction contract with LCR. The Project was substantially completed on July 21, 2024. The total construction cost, including the contract change orders, is $2,426,256.20. After final inspection of the Project, determination of final quantities, and progress payment processing, the Project is now ready for the Notice of Completion.

Item: 8
40 Staff are requesting the City Council approve the Notice of Completion (Attachment 1) and direct staff to release any unencumbered retention in accordance with California law. Sufficient funding exists in the 2023-25 Capital Improvement Projects Budget – Street Resurfacing and Slurry Seal Improvement Project to cover the costs of the recommended action.

BACKGROUND:

The City has an established annual street maintenance program to slurry seal and asphalt overlay public streets. As a requirement of OCTA’s Measure M funding, the City utilizes a pavement management system to evaluate and score the condition of each street biannually utilizing a PCI. The pavement management system provides recommendations to maintain street condition based on the PCI rating. The PCI for the entire City is 75, or “Good” on a scale of 0-100, with 100 being a new street.

The City performs slurry seal applications in ten-year intervals and resurfaces streets on an as-needed basis with available funding. As part of the slurry seal program, staff also identified locations on the streets within zones that require structural repairs in addition to the slurry seal. The contractor would perform these localized repairs prior to the application of the slurry seal. This best management practice reduces expensive reconstruction costs by extending the useful life of the pavement without the need for full resurfacing of the asphalt.

Zone D area is historically the largest zone and has grown with the addition of the Baker Ranch neighborhoods. Additionally, fiber optic companies are microtrenching throughout the city and were moving to Zone D at the time of award of this project. Considering these factors, staff decided to approach Zone D differently by dividing the work into two phases: repairing asphalt to preserve structural integrity of existing pavement first and applying slurry seal after fiber optic installation is complete. The Fiscal Year 2023-25 slurry seal project for non- arterial streets was identified as Zone D.

On November 19, 2024, the City Council awarded a construction contract to LCR for the asphalt Repair Project for Non-Arterial Streets, Zone D for $2,257,700.

The Project began on January 21, 2025. The City Manager authorized Contract Change Order (“CCO #1”), which added $168,556.20 in compensation to the construction contract with LCR. This Change Order provided compensation for additional work related to final quantity adjustments based on field conditions and performing a 7’ header grind and overlay existing pavement on Canada Road from Dimension Drive to Lake Forest Drive.

Item: 8
41 DISCUSSION:

LCR substantially completed construction activities on July 21, 2025. The City’s construction manager conducted a final inspection to ensure the Project’s completion per the contract requirements.

The Notice of Completion establishes a date that limits the time subcontractors and material vendors may file stop notices or liens against the project. Following City Council approval, the City Clerk must submit the Notice of Completion to the Clerk Recorder of Orange County within 15 days of the City Council’s action, as required by Section 9204 of the California Civil Code. Following approval and recordation, the Notice of Completion establishes a 30-day period for subcontractors and material vendors to file stop payment notices and initiates the start date for the warranty period. Since the work has been completed and accepted by the City, staff recommend the City Council approve the Notice of Completion and release the retention payment 30 days after recording the Notice of Completion, providing there are no stop notices for the project on file with the City.

Approving the recommended action would find the project complete, authorize the Mayor and City Clerk to sign the Notice of Completion, and allow staff to release any unencumbered retention in accordance with California law.

FISCAL IMPACT:

The fiscal impact of the recommended action would find the Project complete, authorize the Mayor and City Clerk to sign the Notice of Completion, and allow staff to release any unencumbered retention in accordance with California law.

The total contract cost of the Project would be $2,426,256.20. Sufficient funding exists in the 2023-25 Capital Improvement Projects Budget – Street Resurfacing and Slurry Seal Improvement Project to cover the costs of the recommended action.

ATTACHMENT(S):

Notice of Completion for Asphalt Repairs Project for Non-Arterial Streets, Zone D (24S01A)
Initiated By: Nazila Mokarram, CIP Manager
Submitted By: Douglas Erdman, P.E., Acting Director of Public Works/City Engineer
Approved By: Debra Rose, City Manager
Item: 8
42 ATTACHMENT
Item: 8
43 RECORDING REQUESTED BY
AND MAIL TO:

City Clerk
City of Lake Forest
100 Civic Center Drive
Lake Forest, California, 92630

Fee Exempt – Gov’t Code §27383

NOTICE OF COMPLETION
(C.C.C. 9204 - PUBLIC WORKS)

NOTICE IS HEREBY GIVEN THAT:

1. The City of Lake Forest located at 100 Civic Center Drive, Lake Forest, California, 92630, has completed a public work of improvement described as Asphalt Repair Project for Non-Arterial Streets, Zone D (24S01A) and accepted by the awarding authority upon the date hereof.

2. Date of completion: September 2, 2025

3. Description of work performed: Asphalt Repair Project for Non-Arterial Streets, Zone D (24S01A)

4. The City’s interest in the property in which the public work was completed is: X Fee  Easement  Lease.

5. The real property upon which said public work was performed in the City of Lake Forest is: Public right-of-way in the City of Lake Forest.

6. The contractor was: LCR Earthwork & Engineering, Corp.

Dated ____________________________________ __________________________________________ Scott Voigts, Mayor

ATTEST:

_________________________________________
Thy Merritt, Acting City Clerk

VERIFICATION

I, the undersigned, say: I am the Mayor of the City of Lake Forest , the declarant of the foregoing Notice of Completion; I have read said Notice of Completion and know the contents thereof, the same is true of my knowledge. I declare under penalty of perjury that the foregoing is true and correct.

Executed at Lake Forest, California, on this ____ day of _________________, 2025.

__________________________________________
Scott Voigts Mayor

ATTEST:

__________________________________________
Thy Merritt, Acting City Clerk
Item: 8
44 CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: Public Works
SUBJECT:

AWARD CONSTRUCTION CONTRACT FOR EL TORO ROAD CORRIDOR
IMPROVEMENTS - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)
RECOMMENDED ACTION(S):

1. Approve contract documents for construction of Jeronimo Road Widening (PW 2019-08), El Toro Road Median Improvements (PW 2020-07), and Trabuco Road Median Improvements (24S09B).

2. Adopt a Resolution entitled, “A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE FOREST, CALIFORNIA, AMENDING THE 2025- 2032 CAPITAL IMPROVEMENT PLAN; AMENDING APPROPRIATIONS
FOR FISCAL YEAR 2025-26.”

3. Award a contract in the amount of $8,364,464 to All American Asphalt, Inc.

4. Reject all other bids received and authorize return of the bid bonds upon receipt of the executed contract documents from All American Asphalt, Inc.

5. Authorize the Mayor to sign, and the City Clerk to attest the contract with All American Asphalt, Inc.

EXECUTIVE SUMMARY:

The El Toro Road Corridor Improvements include 3 projects: Jeronimo Road Widening (PW 2019-08), El Toro Road Median Improvements (PW 2020-07), and Trabuco Road Median Improvements (24S09B). The Jeronimo Road Widening will correct an existing misalignment of the through lanes and provide for an additional left-turn lane on eastbound and westbound El Toro Road at Jeronimo Road. The El Toro Road Median Improvements will construct raised medians and rehabilitate the pavement on El Toro Road from Jeronimo Road to Trabuco Road. The Trabuco Road Median Improvements will replace the existing painted median and stick down delineators with a raised hardscaped median on Trabuco Road north of El Toro Road.

Item: 9
45 On July 16, 2025, the City received bids from two (2) bidders, ranging from $8,364,464.00 to $8,767,623.90. The apparent low bidder is All American Asphalt (“AAA”). The total cost to construct, inspect, provide construction support, and provide contingency for the 3 projects is estimated to be $9.7 million.

Currently, there are insufficient funds budgeted for the Jeronimo Road Widening and El Toro Road Median Improvements, which are both part of the Foothill Circulation Phasing Plan (“FCPP”). These projects will require the appropriation of additional FCPP funds of $2,227,627 and $5,422,328, respectively.

Accordingly, the attached proposed budget resolution would appropriate the additional FCPP funds for the first two projects and reduce the General Fund (CIP) budget for the third project as necessary to proceed with the construction phase of these projects.

Staff recommends the City Council approve the proposed budget resolution to ensure there is sufficient funding for all 3 projects and award the proposed construction contract to AAA in the amount of $8,364,464. The Finance Department prepared the proposed construction contract with AAA, and the City Attorney has reviewed and approved the contract as to form.

BACKGROUND:

The Foothill Circulation Phasing Plan (“FCPP”) was established by the County Board of Supervisors in 1987 to provide for the construction of a regional road network in the foothills of South Orange County. This is a developer fee-based program to mitigate traffic impacts in the canyon and foothill areas. The City took over the remaining mitigation projects after its incorporation in 1991. Two of the three projects included with the El Toro Road Corridor Improvements are FCPP projects.

The Jeronimo Road Widening is an FCCP project that consists of widening Jeronimo Road north of El Toro Road to correct an existing misalignment of the through traffic lanes located south of the intersection. The City is acquiring approximately 3,400 square feet of additional right-of-way and a temporary construction easement (“TCE”) of approximately 6,600 square feet from the property located at the northwest corner of this intersection through the eminent domain process. The additional right-of-way and TCE are required to construct the retaining wall and parkway improvements necessary to accommodate the proposed street widening. Eastbound and westbound El Toro Road will also be restriped for an additional left-turn lane in each direction.

The El Toro Road Median Improvements are also an FCCP project that consists of replacing the existing painted medians along El Toro Road from Jeronimo Item: 9
46 Road to Trabuco Road with raised landscape medians. The Trabuco Road Median Improvements is a General Fund project that will replace the existing painted medians and stick down delineators with a raised hardscaped median to improve traffic safety on Trabuco Road north of El Toro Road.

DISCUSSION:

On May 14, 2025, the El Toro Road Corridor Improvements were publicly advertised on OpenGov to solicit bids for construction as authorized by the City Manager. The El Toro Road Corridor Improvements included three projects on El Toro Road from Jeronimo Road to Trabuco Road (Attachment 1). The three projects were packaged and advertised together as a single construction contract for economies of scale. On July 16, 2025, the City received bids from two (2) firms, ranging from $8,364,464.00 to $8,767,623.90. The engineer’s estimate for the construction of the three projects was approximately $9.2 million. The apparent low bidder is AAA with a total bid amount of $8,364,464. After opening bids, the total project cost to construct, inspect, provide construction support, and provide contingency for the project is estimated to be $9.7M.

Staff reviewed the AAA bid package for completeness. In addition, the electronic bidding system the City utilizes eliminates mathematical errors in the bids, therefore the submitted bid results are as follows:

Table 1: Bid Results
Contracting
Firm
OpenGov
Verified
subtotal for
Jeronimo
Widening
OpenGov
Verified
subtotal for
El Toro
Medians
OpenGov
Verified
subtotal for
Trabuco
Median
OpenGov
Verified Total
Base Bid
Amounts
All American
Asphalt
$2,445,984.85 $5,651,729.15 $266,750.00 $8,364,464.00
Excel Paving $2,398,297.90 $6,100,866.00 $268,460.00 $8,767,623.90 After analysis of the bids received, staff determined that AAA was the lowest responsive and responsible bidder for the combined project. Recently, AAA successfully completed the construction of the Trabuco Road Rehabilitation from Bake Parkway to Peachwood, the Ascension Median Improvements, and Lake Forest Drive Rehabilitation from Bake Parkway to Portola Parkway. Staff conducted a reference check that indicated AAA is a responsible contractor (Attachment 2).

The Finance Department prepared the attached contract with AAA (Attachment 3). The City Attorney reviewed and approved the contract as to form. The contract bid amount as determined by the estimated quantities is $8,364,464.

Item: 9
47 Per Lake Forest Municipal Code Section 3.13.085, the City Manager may approve additional work not-to-exceed 10% of the final contract amount (i.e., $836,446). Due to size, the contract plans and specifications are not attached to the agenda; however, they are available for review upon request in the Office of the City Clerk. Staff have attached the approved signed title sheets for the combined project (Attachment 4).

Currently, there are insufficient funds budgeted for the Jeronimo Road Widening and El Toro Road Median Improvements, which are both part of the Foothill Circulation Phasing Plan (“FCPP”). These projects will require the appropriation of additional FCPP funds of $2,227,627 and $5,422,328, respectively.

Accordingly, the attached proposed budget resolution would appropriate the additional FCPP funds for the first two projects and reduce the General Fund (CIP) budget for the Arterial Median Improvement project as necessary to proceed with the construction phase of these projects (Attachment 5).

FISCAL IMPACT:

Approving the recommended action would appropriate sufficient funding in the 2025-2032 Capital Improvement Plan and award a construction contract to All American Asphalt, Inc. in the amount of $8,364,464. The total estimated project cost to construct, inspect, provide construction support, and provide contingency for the El Toro Road Corridor Improvements is $9.7 million. While the City has deposited $337,000 in escrow with the State of California, final right-of-way acquisition costs are pending.

ATTACHMENTS:

1. Location Map

2. Contractor’s Reference Check

3. Contract with All American Asphalt, Inc.

4. Signed Title Sheets

5. Proposed Budget Resolution
Initiated By: Jonathan Claudio, Principal Civil Engineer Submitted By: Douglas Erdman, Acting Director of Public Works/City Engineer Approved By: Debra Rose, City Manager
Item: 9
48 ATTACHMENT 1
Item: 9
49 Item: 9
50 ATTACHMENT 2
Item: 9
51 Apparent Low Bidder: Contact #1: Contact #2: Contact #3:

All American Asphalt, Inc. City of Riverside City of Irvine City of Corona Name Mark Mesen Stacy Delong Ismael Rivera
Phone No. (951) 826-5311 (949) 724-7365 (951) 736-2400
E-mail [email protected] [email protected] [email protected]

QUESTION RESPONSE RESPONSE RESPONSE

1. Title and type of project SB-1 Street Improvement Jamboree Pavement RehabilitationCitywide Street Pavement Rehabilitation

2. Contract Amount $8,965,843 $7,869,222 $14,236,116

3. Approximate duration April 2023 - January 2024 June 2023 - December 2024 December 2023 - July 2025

4. Actual or estimated project completion date January-24 December-24 July 2025

5. Quality of the work Very Good Very Good Very Good

6. Similarity of the Project
Very good - Our project involved
concrete, ARAM, asphalt, electrical,
signing and striping improvements at
various locations throughout City.

Very Good Good

7. Contractor’s relationship with agency representatives Very good - Contractor, both office and
field staff had good communications
with City staff.

Very Good Very Good

8. Claims or stop notices No No No

9. Change order requests
Yes - Contract Change Orders only
processed to adjust over/under contract
quantities due to minor changes in the
work by city.

Yes Yes

10. Agency’s desire to have contractor bid on future projects 5 - All America Asphalt is an excellent
contractor to work with. No issues
working with them again.

Yes Yes

11. Additional Comments None. Excellent contractor.

Overall, enjoyed working with AAA. I
have completed several projects with
them and have not had any issues.

JERONIMO ROAD WIDENING PROJECT (22T07);
EL TORO ROAD MEDIAN IMPROVEMENTS (22S05);
TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)
Item: 9
52 ATTACHMENT 3
Item: 9
53 EL TORO ROAD CORRIDOR IMPROVEMENTS - A: JERONIMO
ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD
MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN
IMPROVEMENTS (24S09B)

City of Lake Forest
100 Civic Center Dr.

Lake Forest, CA 92630

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
54 City of Lake Forest
Section 00500 Construction Contract
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)
I. SECTION 00500 CONSTRUCTION CONTRACT ................................ ........

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
55 Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 3 1. SECTION 00500 CONSTRUCTION CONTRACT

1.1. CONTRACT
THIS CONTRACT is made this [***INSERT DAY***] day of [***INSERT MONTH***], [***INSERT YEAR***], in the County of Orange, State of California, by and between the City of Lake Forest hereinafter called City, and All American Asphalt., hereinafter called Contractor. City and the Contractor for the considerations stated herein agree as follows:

1.2. SCOPE OF WORK
The Contractor shall perform all Work within the time stipulated the contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in "COMPONENT PARTS OF THE CONTRACT" section below for the following Project:

EL TORO ROAD CORRIDOR IMPROVEMENTS: A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B:

EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) , PW 2019-08, PW 2020-07
The Contractor and its surety shall be liable to City for any damages arising as a result of the Contractor’s failure to comply with this obligation.

1.3. TIME FOR COMPLETION
The Work shall be commenced on the date stated in City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within one hundred and fifty (150) working days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.

1.4. CONTRACT PRICE
City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of EIGHT MILLION THREE HUNDRED SIXTY-FOUR THOUSAND FOUR HUNDRED SIXTY- FOUR DOLLARS ($8,364,464.00). Payment shall be made as set forth in the General Conditions.

1.5. LIQUIDATED DAMAGES
In accordance with Government Code section 53069.85, it is agreed that the Contractor will pay City the sum of two thousand five hundred dollars ($2,500) for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event that Liquidated Damages are not paid, the Contractor agrees City may deduct that amount from any money due or that may become due the Contractor under the Contract.

This Article does not affect the City’s rights to other damages or remedies specified in the Contract Documents or allowed by law.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
56 Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 4 1.6. COMPONENT PARTS OF THE CONTRACT
The “Contract Documents” include the following:
• Notice Inviting Bids
• Instructions to Bidders
• Bid Form
• Contractor’s Certificate Regarding Workers’ Compensation • Bid Bond
• Designation of Subcontractors
• Information Required of Bidders
• Noncollusion Declaration form
• Iran Contracting Act Certification
• Public Works Contractor Registration Certification
• Contract
• Performance Bond
• Payment Bond
• General Conditions
• Special Conditions
• Technical Specifications
• Addenda
• Plans and Drawings
• Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract The Contactor shall complete the Work in strict accordance with all of the Contract Documents.

All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.

1.7. PROVISIONS REQUIRED BY LAW
Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
57 Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 5 applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Project.

1.8. INDEMNIFICATION
Contractor shall provide indemnification as set forth in the General Conditions.

1.9. PREVAILING WAGES
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at City Hall or may be obtained online at http//www.dir.ca.gov/dlsr. and which must be posted at the job site.

1.10. SIGNATURES
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.

All American Asphalt
By [VENDOR SIGNATURE 1]

Name: Mark Luer
Title: President
License No. [CONTRACTOR LICENSE NUMBER]

CITY OF LAKE FOREST
By [AUTHORIZED CITY SIGNATURE]
______________________________
Scott Voigts
Mayor
By [VENDOR SIGNATURE 2]

Name: [Michael Farkas
Title: [Secretary (Corporation or LLC)
(If Corporation, TWO SIGNATURES, President OR
Vice President AND Secretary OR Treasurer
REQUIRED)]

Attest:
[CITY CLERK SIGNATURE]

Thy Merritt
Acting City Clerk
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 267073A
Item: 9
58 Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 6 [CONTRACT ADMINISTRATOR APPROVAL]
[PROJECT MANAGER APPROVAL]
[CITY CLERK - INSURANCE APPROVAL]
Approved as to Form:
[CITY ATTORNEY SIGNATURE]
__________________________________
Best Best & Krieger, LLP
City Attorney

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
59 City of Lake Forest
Finance
Kevin Shirah, Director of Finance
100 Civic Center Dr., Lake Forest, CA 92630

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) RESPONSE DEADLINE: July 16, 2025 at 10:00 am
Report Generated: Thursday, August 7, 2025

All American Asphalt Response

CONTACT INFORMATION
Company:

All American Asphalt
Email:
[email protected]
Contact:

Public Works
Address:
400 E. 6th Street
Corona, CA 92879
Phone:
(951) 736-7600
Website:
https://allamericanasphalt.com/
Submission Date:

Jul 16, 2025 9:54 AM (Pacific Time)
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
60 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 2 ends

ADDENDA CONFIRMATION
Addendum #1
Confirmed Jun 3, 2025 10:46 AM by Public Works
Addendum #2
Confirmed Jun 3, 2025 11:48 AM by Public Works
Addendum #3
Confirmed Jun 24, 2025 1:48 PM by Public Works
Addendum #4
Confirmed Jun 24, 2025 1:48 PM by Public Works
Addendum #5
Confirmed Jun 24, 2025 2:12 PM by Public Works
Addendum #6
Confirmed Jul 10, 2025 9:16 AM by Public Works

QUESTIONNAIRE

1. Bid Form*
The undersigned, hereby declare that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all plans, specifications, and all addenda, if any, for the following Project:
• TEMPLATE_Bid_Form_Section_0...
• TEMPLATE_Bid_Form_Section_0...

Bid_Form.pdf
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
61 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 3 ends

2. Contractor’s Certificate Regarding Workers’ Compensation* Please download the below documents, complete, and upload:
"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract." • Contractors_Certificate_Reg...

Contractor’s_Certificate_Regarding_Workers’_Compensation.pdf

3. Bid Bond*
Please download the below documents, complete, and upload. • TEMPLATE_Bid_Bond_Section_0...

Lake_Forest_BId_Bond.pdf

4. Noncollusion Declaration*
Please download the below documents, complete, and upload. • Noncollusion_Declaration_Se...

Noncollusion_Decleration.pdf

5. Contractor Information and Experience Form*
Please download the below documents, complete, sign, scan, and upload. Incomplete forms without appropriate signatures will not be accepted and will result in incomplete bid.
• TEMPLATE_Contractor_Informa...
• Contractor_Information_and_...

Contractor_Information_and_Experience_Form.pdf
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
62 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 4 ends

6. List of Subcontractors Form*
Please download the below documents, complete, sign, scan, and upload. Incomplete forms without appropriate signatures will not be accepted and will result in incomplete bid.
• TEMPLATE_List_of_Subcontrac...
• TEMPLATE_List_of_Subcontrac...

List_Of_Subcontracts.pdf

7. Iran Contracting Act Certification*
Please download the below documents, complete, sign, scan, and upload. Incomplete forms without appropriate signatures will not be accepted and will result in incomplete bid.
• Iran_Contracting_Act_Certif...

Iran_Contracting_Act_Certification.pdf

8. Public Works Contractor Registration Certification*
Please download the below documents, complete, sign, scan, and upload. Incomplete forms without appropriate signatures will not be accepted and will result in incomplete bid.
• Public_Works_Contractor_Reg...

Public_Works_Contractor_Registration_Certification.pdf

PRICE TABLES
BASE BID SCHEDULE A: JERONIMO ROAD WIDENING IMPROVEMENTS Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
63 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 5 ends

Line Item Description Quantity Unit of
Measure
Unit Cost Total
A-1 Project Mobilization, Demobilization, and Cleanup (Not to Exceed 5% of Construction Costs)
1 LS $65,000.00 $65,000.00
A-2 Construction Staking, Surveying & Monument Preservation 1 LS $18,000.00 $18,000.00 A-3 Traffic Control & Noticing 1 LS $182,282.45 $182,282.45 A-4 SWPPP & Storm Water Protection 1 LS $8,000.00 $8,000.00 A-5 Sawcut, Excavate & Dispose Ex. AC/PCC Roadway, 2' x 10" Min. 955 SF $12.00 $11,460.00 A-6 Remove & Dispose Ex. Concrete Curb & Gutter 485 LF $28.00 $13,580.00 A-7 Remove & Dispose Ex. Concrete Curb Ramp 1 EA $3,000.00 $3,000.00 A-8 Remove & Dispose Ex. Concrete Sidewalk 3,655 SF $5.00 $18,275.00 A-9 Remove & Dispose Ex. CMU Retaining/Screen Wall & Associated Footings 460 LF $95.00 $43,700.00 A-10 Remove & Dispose Ex. Tree 10 EA $2,500.00 $25,000.00 A-11 Remove/Relocate Ex. Sign & Post 1 EA $215.00 $215.00 A-12 Grading & Earthwork 1 LS $40,000.00 $40,000.00
A-13 Construct PCC Curb & Gutter, A2-8 440 LF $80.00 $35,200.00 A-14 Remove Ex. & Construct New ADA Compliant PCC Accessible Curb Ramp 1 EA $9,400.00 $9,400.00 A-15 Construct ADA Accessible 4" PCC Sidewalk 3,430 SF $13.00 $44,590.00 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
64 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 6 ends

Line Item Description Quantity Unit of
Measure
Unit Cost Total
A-16 Construct 10" CMB 285 TON $65.00 $18,525.00
A-17 Construct 3-1/2" AC Pavement Section 165 TON $160.00 $26,400.00 A-18 Construct 0" To 2" Variable Depth AC Cold Mill 6,290 SF $0.46 $2,893.40 A-19 A-19 2" Uniform Depth AC Cold Mill 35,400 SF $0.79 $27,966.00 A-20 Construct 2" ARHM Overlay 525 TON $180.00 $94,500.00 A-21 Coordinate SCG Vault Relocation & Prep Work Area 1 LS $500.00 $500.00 A-22 Adjust Ex. SMWD Manhole Frame & Cover to Grade 1 EA $3,700.00 $3,700.00 A-23 Relocate Ex. SMWD Air Vac Ornamental Pole 1 LS $19,000.00 $19,000.00 A-24 Relocate IRWD Fire Hydrant Assembly 1 EA $20,000.00 $20,000.00 A-25 Remove & Replace IRWD Water Valve Frame & Cover to Grade 3 EA $2,000.00 $6,000.00 A-26 Adjust Cathodic Protection Test Station Frame & Cover to Grade 1 EA $3,700.00 $3,700.00 A-27 Adjust Ex. Water Valve Frame & Cover to Grade 2 EA $2,000.00 $4,000.00 A-28 Construct CMU Retaining/Screen Wall 400 LF $1,100.00 $440,000.00 A-29 Construct CMU Wall Standard Pilaster 7 EA $1,650.00 $11,550.00 A-30 Construct CMU Wall Monument Pilaster 2 EA $2,774.00 $5,548.00 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
65 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 7 ends

Line Item Description Quantity Unit of
Measure
Unit Cost Total
A-31 Remove & Reconstruct/Reconfigure Steel Security Fencing & Gate. Material, Color & Finish to Match Existing
1 LS $20,000.00 $20,000.00
A-32 Forest Glenn Hillside Stabilization and Temporary Planting 1 LS $20,000.00 $20,000.00 A-33 Remove & Replace "Forest Glen" Monument sign, in Like Condition 1 LS $17,000.00 $17,000.00 A-34 Traffic Signal Modifications 1 LS $540,000.00 $540,000.00 A-35 Implement Signing & Striping 1 LS $50,000.00 $50,000.00 A-36 Traffic Signal Interconnect Improvements 1 LS $597,000.00 $597,000.00 TOTAL $2,445,984.85

BASE BID SCHEDULE B: EL TORO ROAD MEDIAN IMPROVEMENTS
Line Item Description Quantity Unit of
Measure
Unit Cost Total
B-1 Project Mobilization, Demobilization, & Cleanup (Not to Exceed 5% of Construction Costs)
1 LS $155,000.00 $155,000.00
B-2 Construction Staking & Surveying 1 LS $50,000.00 $50,000.00 B-3 Traffic Control & Noticing 1 LS $479,400.00 $479,400.00 B-4 SWPPP & Storm Water Protection 1 LS $15,000.00 $15,000.00 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
66 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 8 ends

Line Item Description Quantity Unit of
Measure
Unit Cost Total
B-5 Sawcut, Remove & Dispose Ex. PCC Curb & Gutter, Sidewalk, & AC Roadway Paving for El Toro Rd Widening near Jeronimo Rd and Median Construction (Unclassified Excavation)
60 CY $260.00 $15,600.00
B-6 4" Uniform Depth Cold Mill 488,450 SF $0.95 $464,027.50 B-7 Construct 1.5" AC Leveling Course 4,580 TON $132.00 $604,560.00 B-8 Construct 2.5" ARHM Overlay 7,640 TON $150.00 $1,146,000.00 B-9 Local Digouts - 4" Thick (Sta. 104+00 to Jeronimo) 2,575 SF $4.75 $12,231.25 B-10 Local Digouts - 12.5" Thick (Jeronimo Rd to Toledo Way ) 21,435 SF $15.00 $321,525.00 B-11 Local Digouts - 14" Thick (Toledo Way to Trabruco Rd) 39,900 SF $16.65 $664,335.00 B-12 Added Cost for Disposing Pavement Fabric (Estimated from Corings) 72,960 SF $0.24 $17,510.40 B-13 Remove & Reconstruct 4" PCC Sidewalk, Prune & Remove Conflicting Roots, Coordinate with City Arborist
1,180 SF $14.00 $16,520.00
B-14 Remove Ex. & Construct New ADA Compliant PCC Accessible Curb Ramp 4 EA $11,800.00 $47,200.00 B-15 Remove & Reconstruct 8" PCC Curb & Gutter, A2-8 220 LF $90.00 $19,800.00 B-16 Sawcut, Remove Ex. Curb and/or Curb & Gutter, AC/PCC Roadway & Construct New PCC Bus Pad & Monolithic Curb & Gutter
10,780 SF $28.00 $301,840.00
B-17 Fill Sidewalk Pothole with PCC, Flush with Ex. Surface 4 EA $1,000.00 $4,000.00 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
67 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 9 ends

Line Item Description Quantity Unit of
Measure
Unit Cost Total
B-19 Construct 4.5" AC Pavement Base Course 90 TON $245.00 $22,050.00 B-20 Construct 10" CMB 150 TON $65.00 $9,750.00
B-21 Remove & Relocate Ex. Pedestrian Traffic Push Button to 3'-6" above Grade 16 EA $2,500.00 $40,000.00 B-22 Remove & Reconstruct PCC Driveway, 10% Max 200 SF $30.00 $6,000.00 B-23 Remove & Reconstruct Private Curb & Gutter 18 LF $90.00 $1,620.00 B-24 Remove & Reconstruct Private AC Pavement, in Kind 150 SF $20.00 $3,000.00 B-25 Sawcut & Remove ex. AC Roadway Section and Construct 8" PCC Median Curb, Type A1-8
7,200 LF $57.00 $410,400.00
B-26 Backfill, Grade, & Compact Median Infill Area with Crushed Roadway Spoils & CMB Import (+/- 4" Thick)
10,700 SF $2.85 $30,495.00
B-27 Additional Sawcut & Roadway Section Removal Within Median Planting Area 11,000 SF $3.30 $36,300.00 B-28 Trench & Extend Water & Low Voltage to Median 2 EA $4,500.00 $9,000.00 B-29 Trench & Install Irrigation & Low Voltage Sleeves Across Intersections 200 LF $50.00 $10,000.00 B-30 Import soil for Planting Area 190 CY $125.00 $23,750.00 B-31 Install Median Cobble Paving 10,700 SF $17.25 $184,575.00 B-32 Install Irrigation System 1 LS $135,000.00 $135,000.00 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
68 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 10 ends

Line Item Description Quantity Unit of
Measure
Unit Cost Total
B-33 Landscape Grading & Planting 1 LS $85,000.00 $85,000.00 B-34 Remove & Replace Ex. IRWD Domestic or Reclaimed Water Valve Frame & Cover to Grade
31 EA $2,000.00 $62,000.00
B-35 El Toro & Toledo Video Detection Signal Upgrade 1 LS $49,000.00 $49,000.00 B-36 El Toro & Serrano Video Detection Signal Upgrade 1 LS $49,000.00 $49,000.00 B-37 El Toro & Trabuco Video Detection Signal Upgrade 1 LS $49,000.00 $49,000.00 B-38 Remove & Replace Traffic Loop Detector 22 EA $545.00 $11,990.00 B-39 Implement Signing & Striping Plans 1 LS $83,000.00 $83,000.00 B-40 90 Day Landscape Establishment Period 1 LS $6,250.00 $6,250.00 TOTAL $5,651,729.15

BASE BID SCHEDULE C: TRABUCO ROAD MEDIAN IMPROVEMENTS
Line Item Description Quantity Unit of
Measure
Unit Cost Total
C-1 Project Mobilization, Demobilization, and Cleanup (Not to Exceed 5% of Construction Costs)
1 LS $10,000.00 $10,000.00
C-2 Construction Staking & Surveying 1 LS $6,000.00 $6,000.00 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
69 [ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
RFB No. 2025-RFB-108
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

[ALL AMERICAN ASPHALT] RESPONSE DOCUMENT REPORT
Request for Bids (RFB) - El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)

Page 11 ends

Line Item Description Quantity Unit of
Measure
Unit Cost Total
C-3 Traffic Control & Noticing 1 LS $12,000.00 $12,000.00 C-4 SWPPP & Storm Water Protection 1 LS $5,000.00 $5,000.00 C-5 Sawcut, Excavate & Dispose Ex. AC/PCC Roadway for Median Construction 30 CY $300.00 $9,000.00 C-6 4" Uniform Depth Cold Mill 25,000 SF $0.95 $23,750.00 C-7 Construct 1.5" AC Leveling Course 240 TON $132.00 $31,680.00 C-8 Construct 2.5" ARHM Overlay 390 TON $150.00 $58,500.00 C-9 Construct 8" PCC Median Curb, A1-8 70 LF $220.00 $15,400.00 C-11 Install Variable Depth AC Leveling Course, 2.5" Max 390 TON $143.00 $55,770.00 C-12 Construct 12-18" Wide Monolithic Curb 250 LF $110.00 $27,500.00 C-13 Remove & Replace Traffic Loop Detector 10 EA $545.00 $5,450.00 C-14 Implement Signing & Striping Plans 1 LS $6,700.00 $6,700.00 TOTAL $266,750.00

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
70 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
71 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
72 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
73 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
74 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
75 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
76 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
77 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
78 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
79 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
80 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
81 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
82 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
83 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
84 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
85 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
86 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
87 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
88 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
89 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
90 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
91 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
92 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
93 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
94 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
95 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
96 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
97 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
98 SURVEY

ORANGE, CA
LS 8231
1000007166

REMOVE TREE

V&E TREE SERVICE

ORANGE, CA
654506
1000001936

GRANSTORM MASONORY

TORRANCE, CA
629489
1000004794

WALL REBAR, CMU
1000001610
1000004804
614518
738518

ORANGE, CA

CHINO, CA

ELECNOR BELCO

SMTISHON ELECTRIC

VIDEO DETECTION

TRAFFIC LOOPS

CL SURVEYING & MAPPING

1.5 .3

3.6 1.6

16.1 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
99 KATO LANDSCAPE

LANDSCAPE & IRRIGATION

FOUNTAIN VALLEY,CA
806122
100000086

SUPERIOR PAVEMENT

STRIPING

CYPRESS,CA
776306
100000147

5.5 .2
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
100

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
101

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
102

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
103

REQUEST FOR BIDS (RFB)
2025-RFB-108
EL TORO ROAD CORRIDOR IMPROVEMENTS - A: JERONIMO
ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD
MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN
IMPROVEMENTS (24S09B)

City of Lake Forest
100 Civic Center Dr.

Lake Forest, CA 92630

RELEASE DATE: May 14, 2025
DEADLINE FOR QUESTIONS: July 7, 2025
RESPONSE DEADLINE: July 16, 2025, 10:00 am

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
104

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 2 RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/lakeforestca
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
105

City of Lake Forest

REQUEST FOR BIDS (RFB)
El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)
I. SECTION 00000 TITLE PAGE ................................ ................................ ..

II. SECTION 00010 INTRODUCTION ................................ ...........................

III. SECTION 00100 NOTICE INVITING BIDS ................................ .................

IV. SECTION 00200 INSTRUCTION TO BIDDERS ................................ ..........

V. SECTION 00500 CONTRACT (MODEL) ................................ ....................

VI. SECTION 00700 GENERAL CONDITIONS ................................ ................

VII. SECTION 00750 SPECIAL CONDITIONS ................................ ..................

VIII. SECTION 00800 TECHNICAL CONDITIONS ................................ .............

IX. SECTION 00900 PLANS AND SPECIFICATIONS ................................ .......

X. APPENDIX A INSURANCE REQUIREMENTS ................................ ............

XI. PRICING PROPOSAL - BID LINE ITEMS ................................ ...................

XII. VENDOR REQUIRED FORMS ................................ ................................ .

Attachments:

A - ME0399C Jeronimo Widening Specs Cover Page - Signed B - TEMPLATE Performance Bond_Section 00610
C - TEMPLATE Payment Bond_Section 00620
D - 2025.04.15 ME0399C - Fire Station Signal Plans
E - 2025.04.15 ME0399C - Interconnect Plans
F - 2025.04.15 ME0399C - Jeronimo Widening Package
G - 2025.04.15 ME0399F - El Toro Median Improvements
H - Appendix B - Geotechnical - 20G178-1 Limited Geotechnical Investigation I - Appendix B - Geotechnical - El Toro Road Pavement Evaluation and Repair Recommendations Report
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
106

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 4 J - Appendix C - TCE - 2024-11-04 ME0399C Temporary Construction Easement K - Appendix C - TCE - Lake Forest Jeronimo Road - Grant Deed (TCE) Final L - Appendix D - Lake Forest Technical SPECS - Section 700 Traffic Signal_Final

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
107

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 5 1. SECTION 00000 TITLE PAGE

CITY OF LAKE FOREST
EL TORO ROAD CORRIDOR IMPROVEMENTS:

A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08)
B: EL TORO ROAD RESURFACING AND MEDIAN
IMPROVEMENTS (2020-07)
C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)
April 15, 2025

Prepared By:

TAIT & ASSOCIATES
701 N Parkcenter Drive
Santa Ana, CA 92705

_____________________________
David Sloan, P.E.

Under the Supervision Of:

CITY OF LAKE FOREST
Public Works Department
100 Civic Center Drive
Lake Forest, CA 92630
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
108

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 6 Approved By:

_________________________
Thomas Wheeler
Director of Public Works/City Engineer
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
109

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 7 2. SECTION 00010 INTRODUCTION

2.1. Summary

1. El Toro Road Raised medians and Asphalt Resurfacing, from Jeronimo Road to Trabuco Road

2. Median Improvements on Trabuco Road at El Toro Road

3. Jeronimo Road Widening at El Toro Road

2.2. Background
The Jeronimo Road Widening at El Toro Road has an additional $2,500 of liquidated damaged for each and every calendar day of delay beyond the time prescribed in Section 00800, “Technical Conditions” for specifically finishing the Work related to the Jeronimo Road Widening within the prescribed number of working days designated for this work.

2.3. Timeline
Release Project Date May 14, 2025
Pre-Bid Conference and Site Walk
(Mandatory)
June 11, 2025, 2:00pm
100 Civic Center Drive, Community Center Building
- Maple Conference Room
Question Submission Deadline July 7, 2025, 5:00pm
Proposal Submission Deadline July 16, 2025, 10:00am
Anticipated Council Date/City Manager
Approval
August 5, 2025
Anticipated Project Start Date September 15, 2025

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
110

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 8 3. SECTION 00100 NOTICE INVITING BIDS

3.1. Notice Inviting Bids
The City of Lake Forest (“City”) will receive electronic bids only for the EL TORO ROAD CORRIDOR IMPROVEMENTS: A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) Project, no later than 10:00 am on Wednesday, July 16, 2025]. The electronic bid management system will not accept late bids. Bids shall be valid for 90 calendar days after the bid opening date.

Bids must be submitted on City’s Bid Forms, available to registered vendors through the City’s eProcurement Portal. The Contract Documents may be downloaded at no charge. Electronic modifications to or withdrawal of bids may be made by the bidder prior to the bid closing deadline.

Contract Documents will not be available for sale at City Hall.

Plan rooms that register may also download the contract documents and offer them for review. All parties downloading Contract Documents will be listed under the solicitation’s “Followers” tab.

A MANDATORY Pre-Bid Conference will be held at 100 Civic Center Drive, Community Center Building - Maple Conference Roomon the following date(s) and time(s): Wednesday, June 11, 2025AND 2:00 pm.

Each and every Bidder shall attend the Pre-Bid Conference. Prospective Bidders Mayvisit the Project Site without making arrangements through the Assistant City Engineer Bids shall not be accepted from any bidder who did not attend the Pre-Bid Conference.

Bids must be accompanied by cash, a certified or cashier’s check, or a Bid Bond in favor of the City in an amount not less than ten percent (10%) of the submitted Total Bid Price.

3.2. Notice Inviting Bids (continued)
The successful bidder will be required to furnish City with a Performance Bond equal to 100% of the successful bid, and a Payment Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California.

Pursuant to Public Contract Code Section 22300, the successful bidder may substitute certain securities for funds withheld by City to ensure his performance under the Contract.

The Director of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract which will be awarded to the successful bidder, copies of which are on file and will be made available to any interested party upon request at Lake Forest Public Works Department or online at http://www.dir.ca.gov/dlsr. A copy of these rates shall be posted by the successful bidder at the job site.

The successful bidder and all subcontractor(s) under him, shall comply with all applicable Labor Code provisions, which include, but are not limited to the payment of not less than the required prevailing rates to all workers employed by them in the execution of the Contract, the employment of apprentices, the hours of labor and the debarment of contractors and subcontractors.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
111

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 9 Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project.

This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its bid.

Each bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor’s license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract:A. In addition. the successful bidder will be required to self-perform at least 50% of the work.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
112

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 10 4. SECTION 00200 INSTRUCTION TO BIDDERS

4.1. AVAILABILITY OF CONTRACT DOCUMENTS
Bids must be submitted to City on the Bid Forms which are a part of the Bid Package for the Project. "Followers" may download a complete set of Contract Documents at no charge as stated in the Notice Inviting Bids. The Contract Documents may be made available for review through the City's eProcurement Portal.

Please Note: "Followers" who choose to review the Contract Documents must also register with the City's eProcurement Portal to ensure it receives all relevant updates and to submit a bid electronically, if authorized in the Notice Inviting Bids.

4.2. EXAMINATION OF CONTRACT DOCUMENTS
City has made copies of the Contract Documents available, as indicated above. Bidders shall be solely responsible for examining the May Project Site and the Contract Documents, including any Addenda issued during the bidding period, and for informing itself with respect to local labor availability, means of transportation, necessity for security, laws and codes, local permit requirements, wage scales, local tax structure, contractors’ licensing requirements, availability of required insurance, and other factors that could affect the Work. Bidders are responsible for consulting the standards referenced in the Contract. Failure of Bidder to so examine and inform itself shall be at its sole risk, and no relief for error or omission will be given except as required under State law.

4.3. INTERPRETATION OF CONTRACT DOCUMENTS
Discrepancies in, and/or omissions from the Plans, Specifications or other Contract Documents or questions as to their meaning shall be immediately brought to the attention of City by submission of a written request for an interpretation or correction to City. Such submission, if any, must be sent via the City's eProcurement Portal and received no later than 5:00 pm on Monday, July 7, 2025.

Any interpretation of the Contract Documents will be made only by written addenda duly issued and posted to the City's eProcurement Portal. All plan holders will be notified by e-mail when an addendum is posted. City will not be responsible for any explanations or interpretations provided in any other manner. No person is authorized to make any oral interpretation of any provision in the Contract Documents to any bidder, and no bidder should rely on any such oral interpretation. Bids shall include complete compensation for all items that are noted in the Contract Documents as the responsibility of the Contractor.

4.4. INSPECTION OF SITE; PRE-BID CONFERENCE AND SITE WALK Each "Follower" is responsible for fully acquainting itself with the conditions of the Project Site (which may include more than one site), as well as those relating to the construction and labor of the Project, to fully understand the facilities, difficulties and restrictions which may impact the cost or effort required to complete the Project. To this end, Pre-Bid Conference and and Site Walk will be held on the Wednesday, June 11, 2025 at 2:00 pm, as indicated in the Notice Inviting Bids. Storm, surface, ground, nuisance, or other waters may be encountered at various times during construction of the Project.

Federal and State laws require the City and its contractors to appropriately manage such waters Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
113

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 11 pursuant to the requirements of California State Water Resources Control Board Order Number 2009- 0009-DWQ and any amendment or renewal thereof, the Federal Clean Water Act, the California Porter Cologne Water Quality Control Act, Lake Forest Municipal Code, and any orders issued pursuant to these requirements. By submitting a Bid, each bidder acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.

4.5. ADDENDA
City reserves the right to revise the Contract Documents prior to Wednesday, July 16, 2025. Revisions, if any, shall be made by written Addenda. All Addenda issued by City shall be included in the bid and made part of the Contract Documents. Pursuant to Public Contract Code Section 4104.5, if City issues an Addendum which includes material changes to the project, EL TORO ROAD CORRIDOR IMPROVEMENTS:

A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) , less than 72 hours prior to Wednesday, July 16, 2025, City will extend the deadline for submission of bids. City may determine, in its sole discretion, whether an Addendum warrants postponement of the bid submission date.

Announcement of any extension shall be made via the City's eProcurement Portal to all plan holders.

Please Note: Bidders are responsible for ensuring that they have received any and all Addenda. To this end, the City's eProcurement Portal requires each bidder acknowledge receipt of all addenda before submission of the bid.

4.6. ALTERNATE BIDS
If alternate bid items are called for in the Contract Documents, the lowest bid will be determined on the basis of the base bid only, unless otherwise specified in the Notice Inviting Bids. However, City may choose to award the contract on the basis of the base bid alone or the base bid and any alternate or combination of alternates. The time required for completion of the alternate bid items has been factored into the Contract duration and no additional Contract time will be awarded for any of the alternate bid items. City may elect to include one or more of the alternate bid items, or to otherwise remove certain work from the Project scope of work, accordingly each Bidder must ensure that each bid item contains a proportionate share of profit, overhead and other costs or expenses which will be incurred by the Bidder.

4.7. COMPLETION OF BID FORMS
Bids shall only be prepared using copies of the Bid Forms which are included in the Contract Documents available on the City's eProcurement Portal. The use of substitute bid forms will not be permitted. Bids shall be executed by an authorized signatory as described in these Instructions to Bidders. Deviations in the bid form may result in the bid being deemed non-responsive.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
114

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 12 4.8. ELECTRONIC SUBMISSION REQUIREMENTS
The bidder must enter Pricing in the electronic PRICING PROPOSAL - BID LINE ITEMS Form for any and all line items or a lump sum bid amount, as required. The pricing provided in the electronic Bid Form will be the only valid bid pricing for determination of low bid. The bidder must enter subcontractor information in the PRICING PROPOSAL - BID LINE ITEMS Form. The subcontractor information provided will be the only valid subcontractor information. The bidder must attach pdf file(s) to the bid submission containing all of the completed and signed Bid Documents.

4.9. MODIFICATIONS OF BIDS
Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents.

Unauthorized additions, modifications, revisions, conditions, limitations, exclusions or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms, nor make substitutions thereon. Oral, telephonic and electronic modifications will not be considered, unless the Notice Inviting Bids authorizes the submission of electronic bids and modifications thereto and such modifications are made in accordance with the Notice Inviting Bids.

4.10. SIGNING OF BIDS
All Bids submitted shall be executed by the Bidder or its authorized representative. Bidder shall upload an electronic scanned copy of the executed Bid Form to the City's eProcurement Portal. Bidders may be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom.

If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid.

The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom. The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.

4.11. DESIGNATION OF SUBCONTRACTORS
Pursuant to State law, the Bidders must designate the name, license number, and location of each subcontractor who will perform work or render services for the Bidder in an amount that exceeds one half of one percent (1/2%) of the Bidder’s Total Bid Price, or $10,000 if the work involves streets or highways, whichever is greater as well as the portion of work each such subcontractor will perform on the form provided herein by City. No additional time will be provided to bidders to submit any of the requested information in the Designation of Subcontractor form. The successful bidder will be required to self-perform at least50% of the work.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
115

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 13 4.12. DESIGNATION OF SUBCONTRACTORS (continued)

In addition to submitting the List of Subcontractors form with its bid submission, each bidder shall, within 24 hours of Wednesday, July 16, 2025, provide the City with a list of bid items that correspond to the portion of work listed for each designated subcontractor. Failure to provide this information in satisfactory form within the time prescribed may be cause for the City to deem the Bid non-responsive and the City may reject the Bid.

4.13. BID GUARANTEE (BOND)
Each bid shall be accompanied by: (a) cash; (b) a certified check made payable to City; (c) a cashier’s check made payable to City; or (d) a bid bond payable to City executed by the bidder as principal and surety as obligor in an amount not less than 10% of the maximum amount of the bid. Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. The cash, check or bid bond shall be given as a guarantee that the bidder shall execute the Contract if it be awarded to the bidder, shall provide the payment and performance bonds and insurance certificates and endorsements as required herein within ten (10) calendar days after notification of the award of the Contract to the bidder. Failure to provide the required documents may result in forfeiture of the bidder’s bid deposit or bond to City and City may award the Contract to the next lowest responsive, responsible bidder, or may call for new bids.

THE BID SECURITY MUST BE RECEIVED PRIOR TO10:00 am on Wednesday, July 16, 2025.

The Bid Security must be submitted directly to the City Clerk at City Hall, 100 Civic Center Drive, Lake Forest, CA 92630, in an envelope clearly labeled with the Project Name/Number and Bidder’s Name and Address.

If Bidder elects to provide the required Bid Security in the form of a Bid Bond, the original hard copy Bid Bond must be submitted to the City at the address indicated above prior to the specified date and time for bid opening.

4.14. SUBMISSION OF SEALED BIDS
Bidders must submit their bids via City's eProcurement Portal pursuant to Public Contract Code Sections 1600 and 1601. The acceptable method(s) of electronic transmission are stated in the Notice Inviting Bids. City shall not accept bids otherwise transmitted. No oral, telephonic, or facsimile bids will be considered.

It is the sole responsibility of each bidder to see that its Bid is properly submitted to City's eProcurement Portal in the proper form and prior to 10:00 am on Wednesday, July 16, 2025. The City's eProcurement Portal will not accept late bids. The City will only consider bids that have transmitted successfully and have been issued a time stamped email confirmation from City's eProcurement Portal indicating that the Bid was submitted successfully.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
116

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 14 Bidders experiencing any technical difficulties with the bid submission process may contact the OpenGov system support at (650) 336-7167. Neither the City, nor the City's eProcurement Portal, make any guarantee as to the timely availability of assistance, or assurance that any given problem will be resolved by the bid submission date and/or time.

Only where expressly permitted in the Notice Inviting Bids, may Bidders submit their bids via electronic transmission pursuant to Public Contract Code Sections 1600 and 1601. City reserves the right to not accept electronically transmitted bids where not specifically authorized in the Notice Inviting Bids, and may reject any bid not strictly complying with City’s designated methods for delivery.

4.15. DELIVERY AND OPENING OF BIDS
Bids will be received by the City's eProcurement Portal up to 10:00 am on Wednesday, July 16, 2025 shown in the Notice Inviting Bids. It is the Bidder’s sole responsibility to ensure that its Bid is received as specified. Bids may be submitted earlier than 10:00 am on Wednesday, July 16, 2025.

Bid results are available to the public at the closing deadline on the City's eProcurement Portal. The City’s City Clerk’s office will also have bid results, immediately following Wednesday, July 16, 2025. The City Clerk’s office is located at: 100 Civic Center Drive, Lake Forest, CA 92630. City reserves the right to reject any or all Bids and to waive any informality or irregularity in any Bid.

4.16. WITHDRAWAL OF BID
Prior to 10:00 am on Wednesday, July 16, 2025, a Bid may be electronically withdrawn by the Bidder.

Any request to withdraw a bid after bid closing must be made in accordance with Public Contract Code section 5100 et seq. and must be submitted in writing within five (5) working days, excluding Saturday, Sundays and State holidays, specifying in detail how the mistake was made.

4.17. BASIS OF AWARD; BALANCED BIDS
City shall award the Contract to the lowest responsive, responsible Bidder submitting a responsive Bid.

City may reject any Bid which, in its opinion when compared to other bids received or to City’s internal estimates, does not accurately reflect the cost to perform the Work. City may reject as non-responsive any bid which unevenly weights or allocates costs, including but not limited to overhead and profit to one or more particular bid items.

4.18. LICENSING REQUIREMENTS
Pursuant to Section 7028.15 of the Business and Professions Code and Section 3300 of the Public Contract Code, all bidders must possess proper licenses for performance of this Contract.

Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Section 7028.5 of the Business and Professions Code, City shall consider any bid submitted by a contractor not currently licensed in accordance with state law and pursuant to the requirements found in the Contract Documents to be non-responsive, and City shall reject the Bid. City shall have the right to request, and Bidders shall provide within five (5) calendar days, evidence satisfactory to City of all valid license(s) currently held by that Bidder and each of the Bidder’s subcontractors, before awarding the Contract.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
117

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 15 4.19. DISQUALIFICATION OF BIDDERS; INTEREST IN MORE THAN ONE BID No bidder shall be allowed to make, submit or be interested in more than one bid. However, a person, firm, corporation or other entity that has submitted a subproposal to a bidder, or that has quoted prices of materials to a bidder, is not thereby disqualified from submitting a subproposal or quoting prices to other bidders submitting a bid to City. No person, firm, corporation, or other entity may submit subproposal to a bidder, or quote prices of materials to a bidder, when also submitting a prime bid on the same Project.

4.20. INSURANCE REQUIREMENTS
The successful bidder shall procure the insurance in the form and in the amount specified in the Contract Documents.

4.21. AWARD PROCESS
Once all Bids are opened and reviewed to determine the lowest responsive and responsible Bidder, City Council may award the contract. The apparent successful Bidder should begin to prepare the following documents:
(1) the Performance Bond;
(2) the Payment Bond; and
(3)the required insurance certificates and endorsements.

Once City notifies the Bidder of the award, the Bidder will have ten (10) consecutive calendar days from the date of this notification to execute the Contract and supply City with all of the required documents and certifications. Regardless whether the Bidder supplies the required documents and certifications in a timely manner, the Contract time will begin to run ten (10) calendar days from the date of the notification. Once City receives all of the properly drafted and executed documents and certifications from the Bidder, City shall issue a Notice to Proceed to that Bidder.

4.22. FILING OF BID PROTESTS
Bidders may file a “protest” of a Bid with City’s Director of Public Works. In order for a Bidder’s protest to be considered valid, the protest must:
• Be filed in writing within five (5) calendar days after the bid opening date; • Clearly identify the specific irregularity or accusation; • Specify, in detail, the grounds of the protest and the facts supporting the protest; and • Include all relevant, supporting documentation with the protest at time of filing.

If the protest does not comply with each of these requirements, it may be rejected without further review. If the protest is valid, City’s Director of Public Works, or other designated City staff member, shall review the basis of the protest and all relevant information. The Director of Public Works will provide a written decision to the protestor. The protestor may then appeal the decision of the Director of Public Works to the City Manager. The procedure and time limits set forth in this section are Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
118

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 16 mandatory and are the sole and exclusive remedy in the event of a bid protest. Failure to comply with these procedures shall constitute a failure to exhaust administrative remedies and a waiver of any right to further pursue the bid protest.

4.23. WORKERS COMPENSATION
Each bidder shall submit the Contractor’s Certificate Regarding Workers’ Compensation form.

4.24. SUBSTITUTION OF SECURITY
The Contract Documents call for monthly progress payments based upon the percentage of the work completed. The City will retain five percent (5%) of each progress payment as provided by the Contract Documents. At the request and expense of the successful Bidder, the City will substitute securities for the amount so retained in accordance with Public Contract Code Section 22300.

4.25. PREVAILING WAGES
City has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract. These rates are on file and available at the City's Public Works Department or may be obtained online at http://www.dir.ca.gov/dlsr. Bidders are advised that a copy of these rates must be posted by the successful Bidder at the job site(s).

4.26. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Section 1777.1 or Section 1777.7 of the Labor Code. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

4.27. IRAN CONTRACTING ACT CERTIFICATION
Each bidder shall submit the certification required by the Iran Contracting Act of 2010, Public Contract Code section 2200 et seq. as provided with the Bid Documents.

4.28. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. To this end, Bidder shall sign and submit with its Bid the Public Works Contractor Registration Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
119

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 17 Certification on the form provided, attesting to the facts contained therein. Failure to submit this form may render the Bid non-responsive. In addition, each Bidder shall provide the registration number for each listed subcontractor in the space provided in the Designation of Subcontractors Form.

4.29. PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS
Within the time specified in the Contract Documents, the Bidder to whom a Contract is awarded shall deliver to City four identical counterparts of the Performance Bond and Payment Bond in the form supplied by City and included in the Contract Documents. Failure to do so may, in the sole discretion of City, result in the forfeiture of the Bid Guarantee. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to City. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Bid Price.

4.30. REQUEST FOR SUBSTITUTIONS
The successful bidder shall comply with the substitution request procedures set forth in the Bid and Contract Documents. Any deadlines for substitution requests that occur prior to 10:00 amon Wednesday, July 16, 2025 are set forth in the SECTION 00750 SPECIAL CONDITIONS.

4.31. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Contract Documents.

4.32. EXECUTION OF CONTRACT
As required herein the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. City may require appropriate evidence that the persons executing the Contract are duly empowered to do so.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
120

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 18 5. SECTION 00500 CONTRACT (MODEL)

5.1. CONTRACT
THIS CONTRACT is made this [INSERT CONTRACT DATE] , in the County of Orange, State of California, by and between the City of Lake Forest hereinafter called City, and [INSERT VENDOR NAME]., hereinafter called Contractor. City and the Contractor for the considerations stated herein agree as follows:

5.2. SCOPE OF WORK
The Contractor shall perform all Work within the time stipulated the contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in "COMPONENT PARTS OF THE CONTRACT" section below for the following Project:

EL TORO ROAD CORRIDOR IMPROVEMENTS: A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B:

EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) , PW 2019-08, PW 2020-07
The Contractor and its surety shall be liable to City for any damages arising as a result of the Contractor’s failure to comply with this obligation.

5.3. TIME FOR COMPLETION
The Work shall be commenced on the date stated in City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within one hundred and fifty (150) working days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.

5.4. CONTRACT PRICE
City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of [INSERT CONTRACT PRICE ($XXX,XXX.XX)]. Payment shall be made as set forth in the General Conditions.

5.5. LIQUIDATED DAMAGES
In accordance with Government Code section 53069.85, it is agreed that the Contractor will pay City the sum of two thousand five hundred dollars ($2,500) for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event that Liquidated Damages are not paid, the Contractor agrees City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not affect the City’s rights to other damages or remedies specified in the Contract Documents or allowed by law.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
121

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 19 5.6. COMPONENT PARTS OF THE CONTRACT
The “Contract Documents” include the following:
• Notice Inviting Bids
• Instructions to Bidders
• Bid Form
• Contractor’s Certificate Regarding Workers’ Compensation • Bid Bond
• Designation of Subcontractors
• Information Required of Bidders
• Noncollusion Declaration form
• Iran Contracting Act Certification
• Public Works Contractor Registration Certification
• Contract
• Performance Bond
• Payment Bond
• General Conditions
• Special Conditions
• Technical Specifications
• Addenda
• Plans and Drawings
• Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract The Contactor shall complete the Work in strict accordance with all of the Contract Documents.

All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.

5.7. PROVISIONS REQUIRED BY LAW
Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
122

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 20 applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Project.

5.8. INDEMNIFICATION
Contractor shall provide indemnification as set forth in the General Conditions.

5.9. PREVAILING WAGES
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at City Hall or may be obtained online at http//www.dir.ca.gov/dlsr. and which must be posted at the job site.

5.10. SIGNATURES
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.

[NAME OF CONTRACTOR]
By
Name:

Title:

License No.

CITY OF LAKE FOREST
By______________________________

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
123

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 21 By
Name:

Title:
(If Corporation, TWO SIGNATURES, President OR Vice
President AND Secretary OR Treasurer REQUIRED)]

Attest:

City Clerk

Approved as to Form:
__________________________________
Best Best & Krieger, LLP
City Attorney

END OF CONTRACT
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
124

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 22 6. SECTION 00700 GENERAL CONDITIONS

6.1. DEFINITIONS

1. Acceptable, Acceptance or words of similar import shall be understood to be the acceptance of the Engineer and/or City.

2. Act of God is an earthquake in excess of a magnitude of 3.5 on the Richter scale and tidal waves.

3. Approval means written authorization by Engineer and/or City.

4. Contract Documents includes all documents as stated in the Contract.

5. City and Contractor are those stated in the Contract. The terms City and Owner may be used interchangeably.

6. Day shall mean calendar day unless otherwise specifically designated.

7. Engineer shall mean the City Manager, or his or her designee, of the City, acting either directly or through properly authorized agents, such as agents acting within the scope of the particular duties entrusted to them. Also sometimes referred to as “City’s Representative” or “Representative” in the Contract Documents.

8. Equal, Equivalent, Satisfactory, Directed, Designated, Selected, As Required and similar words shall mean the written approval, selection, satisfaction, direction, or similar action of the Engineer and/or City.

9. Indicated, Shown, Detailed, Noted, Scheduled or words of similar meaning shall mean that reference is made to the drawings, unless otherwise noted. It shall be understood that the direction, designation, selection, or similar import of the Engineer and/or City is intended, unless stated otherwise.

10. Install means the complete installation of any item, equipment or material.

11. Material shall include machinery, equipment, manufactured articles, or construction such as form work, fasteners, etc., and any other classes of material to be furnished in connection with the Contract. All materials shall be new unless specified otherwise.

12. Perform shall mean that the Contractor, at Contractor’s expense, shall take all actions necessary to complete The Work, including furnishing of necessary labor, tools, and equipment, and providing and installing Materials that are indicated, specified, or required to complete such performance.

13. Project is The Work planned by City as provided in the Contract Documents.

14. Provide shall include provide, complete in place, that is furnish, install, test and make ready for use. Recyclable Waste Materials shall mean materials removed from the Project site which are required to be diverted to a recycling center rather than an area landfill.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
125

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 23 15. Recyclable Waste Materials include asphalt, concrete, brick, concrete block, and rock.

16. Specifications means that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards and workmanship for the work. Except for Sections 1-9 of the Standard Specifications for Public Works Construction (“Greenbook”), 2021 Edition which are specifically excluded from incorporation into these Contract Documents, the Work shall be done in accordance with the Greenbook, including all current supplements, addenda, and revisions thereof. In the case of conflict between the Greenbook and the Contract Documents, the Contract Documents shall prevail.

17. The Work means the entire improvement planned by City pursuant to the Contract Documents.

18. Work means labor, equipment and materials incorporated in, or to be incorporated in the construction covered by the Contract Documents.

6.2. CONTRACT DOCUMENTS

1. Contract Documents. The Contract Documents are complementary, and what is called for by one shall be as binding as if called for by all.

2. Interpretations. The Contract Documents are intended to be fully cooperative and to be complementary. If Contractor observes that any documents are in conflict, the Contractor shall promptly notify the Engineer in writing. In case of conflicts between the Contract Documents, the order of precedence shall be as follows:

1. Change Orders or Work Change Directives

2. Addenda Special Provisions (or Special Conditions)

3. Technical Specifications Plans (Contract Drawings)

4. Contract

5. General Conditions

6. Instructions to Bidders

7. Notice Inviting Bids

8. Contractor’s Bid Forms

9. Greenbook Standard Specifications (Sections 1-9 Excluded)

10. Standard Plans

11. Reference Documents

12. With reference to the Drawings, the order of precedence shall be as follows:

1. Figures govern over scaled dimensions
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
126

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 24 2. Detail drawings govern over general drawings

3. Addenda or Change Order drawings govern over Contract Drawings

4. Contract Drawings govern over Standard Drawings

5. Contract Drawings govern over Shop Drawings

3. Conflicts in Contract Documents. Notwithstanding the orders of precedence established above, in the event of conflicts, the higher standard shall always apply.

4. Organization of Contract Documents. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing The Work among subcontractors or in establishing the extent of Work to be performed by any trade.

6.3. CONTRACTS DOCUMENTS: COPIES & MAINTENANCE
Contractor will be furnished, free of charge, electronic copies of the Contract Documents. Additional physical copies may be obtained at cost of reproduction.

Contractor shall maintain a clean, undamaged set of Contract Documents at the Project site.

6.4. DETAIL DRAWINGS AND INSTRUCTIONS

1. Examination of Contract Documents. Before commencing any portion of The Work, Contractor shall again carefully examine all applicable Contract Documents, the Project site and other information given to Contractor as to materials and methods of construction and other Project requirements. Contractor shall immediately notify the Engineer of any potential error, inconsistency, ambiguity, conflict or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any subcontractor proceed with Work if uncertain as to the applicable requirements.

2. Additional Instructions. After notification of any error, inconsistency, ambiguity, conflict or lack of detail or explanation, the Engineer will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work.

3. Quality of Parts, Construction and Finish. All parts of The Work shall be of the best quality of their respective kinds and the Contractor must use all diligence to inform itself fully as to the required construction and finish. In no case shall Contractor proceed with The Work without obtaining first from the Engineer such Approval may be necessary for the proper performance of Work.

4. Contractor’s Variation from Contract Document Requirements. If it is found that the Contractor has varied from the requirements of the Contract Documents including the requirement to Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
127

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 25 comply with all applicable laws, ordinances, rules and regulations, the Engineer may at any time, before or after completion of the Work, order the improper Work removed, remade or replaced by the Contractor at the Contractor’s expense.

6.5. EXISTENCE OF UTILITIES AT THE WORK SITE

1. City has endeavored to determine the existence of utilities at the Project site from the records of the owners of known utilities in the vicinity of the Project. The positions of these utilities as derived from such records are shown on the Plans.

2. No excavations were made to verify the locations shown for underground utilities. No guarantee is made or implied that the information is complete or accurate. It shall be the Contractor’s responsibility alone to determine the exact location of underground utilities or substructures of every nature and to protect them from damage.

3. The service connections to these utilities are not shown on the plans. It shall be the responsibility of the Contractor to determine the exact location of all service connections and, if necessary, Contractor shall arrange for the relocation of service connections. The Contractor shall make its own investigations, including exploratory excavations, to determine the locations and type of service connections, prior to commencing Work which could result in damage to such utilities. The Contractor shall immediately notify City in writing of any utility discovered in a different position than shown on the Plans or which is not shown on the Plans.

4. All water meters, water valves, fire hydrants, electrical utility vaults, telephone vaults, gas utility valves, and other subsurface structures shall be relocated or adjusted to final grade by the Contractor. Locations of existing utilities shown on the Plans are approximate and may not be complete. The Contractor shall be responsible for coordinating its Work with all utility companies during the construction of The Work. The Contractor will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations

5. Notwithstanding the above, pursuant to Section 4215 of the Government Code, City has the responsibility to identify, with reasonable accuracy, main or trunkline facilities on the plans and specifications. In the event that main or trunkline utility facilities are not identified with reasonable accuracy in the plans and specifications made a part of the invitation for bids, City shall assume the responsibility for their timely removal, relocation, or protection.

6. Contractor, except in an emergency, shall contact the appropriate regional notification center, Southern California Underground Service Alert at 1-800-227-2600 at least two working days prior to commencing any excavation if the excavation will be performed in an area which is known, or reasonably should be known, to contain subsurface installations other than the underground facilities owned or operated by City, and obtain an inquiry identification number from that notification center. No excavation shall be commenced or carried out by the Contractor unless such an inquiry identification number has been assigned to the Contractor or Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
128

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 26 any subcontractor of the Contractor and City has been given the identification number by the Contractor.

6.6. SCHEDULE

1. Estimated Schedule. Within fourteen (14) days after the issuance of the Notice to Proceed, Contractor shall prepare a Project schedule and shall submit this to the Engineer for Approval.

The receipt or Approval of any schedules by the Engineer or City shall not in any way relieve the Contractor of its obligations under the Contract Documents. The Contractor is fully responsible to determine and provide for any and all staffing and resources at levels which allow for good quality and timely completion of the Project. Contractor’s failure to incorporate all elements of Work required for the performance of the Contract or any inaccuracy in the schedule shall not excuse the Contractor from performing all Work required for a completed Project within the specified Contract time period. If the required schedule is not received by the time the first payment under the Contract is due, Contractor shall not be paid until the schedule is received, reviewed and accepted by the Engineer.

2. Schedule Contents. The schedule shall allow enough time for inclement weather. The schedule shall indicate the beginning and completion dates of all phases of construction; critical path for all critical, sequential time related activities; and “float time” for all “slack” or “gaps” in the non- critical activities. The schedule shall clearly identify all staffing and other resources which in the Contractor’s judgment are needed to complete the Project within the time specified for completion. Schedule duration shall match the Contract time. Schedules indicating early completion will be rejected.

3. Schedule Updates. Contractor shall continuously update its construction schedule. Contractor shall submit an updated and accurate construction schedule to the Engineer whenever requested to do so by Engineer and with each progress payment request. The Engineer may withhold progress payments or other amounts due under the Contract Documents if Contractor fails to submit an updated and accurate construction schedule.

6.7. SUBSTITUTIONS

1. Pursuant to Public Contract Code Section 3400(b) City may make a finding that is described in the invitation for bids that designates certain products, things, or services by specific brand or trade name.

2. Unless specifically designated in the Contract Documents, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
129

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 27 process or article which shall be substantially equal or better in every respect to that so indicated or specified in the Contract Documents. However, City may have adopted certain uniform standards for certain materials, processes and articles.

3. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract.

To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with the Contractor. City has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted.

4. Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from the Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to City in a timely fashion will result in the rejection of the proposed substitution.

5. The Contractor shall bear all of City’s costs associated with the review of substitution requests.

6. The Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article.

7. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400.

6.8. SHOP DRAWINGS

1. Contractor shall check and verify all field measurements and shall submit with such promptness as to provide adequate time for review and cause no delay in his own Work or in that of any other contractor, subcontractor, or worker on the Project, six (6) copies of all shop or setting drawings, calculations, schedules, and materials list, and all other provisions required by the Contract. Contractor shall sign all submittals affirming that submittals have been reviewed and approved by Contractor prior to submission to Engineer. Each signed submittal shall affirm that the submittal meets all the requirements of the Contract Documents except as specifically and clearly noted and listed on the cover sheet of the submittal.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
130

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 28 2. Contractor shall make any corrections required by the Engineer, and file with the Engineer six (6) corrected copies each, and furnish such other copies as may be needed for completion of the Work. Engineer’s approval of shop drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called Engineer’s attention to such deviations at time of submission and has secured the Engineer’s written Approval. Engineer’s Approval of shop drawings shall not relieve Contractor from responsibility for errors in shop drawings.

6.9. SUBMITTALS

1. Contractor shall furnish to the Engineer for approval, prior to purchasing or commencing any Work, a log of all samples, material lists and certifications, mix designs, schedules, and other submittals, as required in the specifications. The log shall indicate whether samples will be provided in accordance with other provisions of this Contract.

2. Contractor will provide samples and submittals, together with catalogs and supporting data required by the Engineer, to the Engineer within a reasonable time period to provide for adequate review and avoid delays in the Work.

3. These requirements shall not authorize any extension of time for performance of this Contract.

Engineer will check and approve such samples, but only for conformance with design concept of work and for compliance with information given in the Contract Documents. Work shall be in accordance with approved samples and submittals.

6.10. MATERIALS

1. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, water, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities of every nature whatsoever necessary to execute and complete this Contract within specified time.

2. Unless otherwise specified, all materials shall be new and the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality.

3. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of The Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work.

4. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the work and agrees upon completion of all work to deliver the Project, to City free from any claims, liens, or charges.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
131

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 29 5. Materials shall be stored on the Project site in such manner so as not to interfere with any operations of City or any independent contractor.

6.11. CONTRACTOR’S SUPERVISION
Contractor shall continuously keep at the Project site, a competent and experienced full-time Project superintendent approved by City. Superintendent must be able to proficiently speak, read and write in English. Contractor shall continuously provide efficient supervision of the Project.

6.12. WORKERS

1. Contractor shall at all times enforce strict discipline and good order among its employees.

Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.

2. Any employee of the Contractor whom City determines is incompetent or unfit shall be removed from this Project.

6.13. SUBCONTRACTORS

1. Contractor agrees to bind every subcontractor to the terms of the Contract Documents as far as such terms are applicable to subcontractor’s portion of The Work. All subcontracts entered into by Contractor relating to any of the Work under this Contract shall comply with and be limited to the extent required by Civil Code section 2872.05. Contractor shall be as fully responsible to City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by Contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and City.

2. City reserves the right to Approve all subcontractors. City’s Approval of any subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.

3. Prior to substituting any subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code section 4100 et seq.

6.14. PERMITS AND LICENSES
Permits and licenses necessary for prosecution of The Work shall be secured and paid for by Contractor, unless otherwise specified in the Contract Documents.

1. Contractor shall obtain and pay for all other permits and licenses required for The Work, including excavation permit and for plumbing, mechanical and electrical work and for operations in or over public streets or right of way under jurisdiction of public agencies other than City.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
132

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 30 2. The Contractor shall arrange and pay for all off-site inspection of the Work related to permits and licenses, including certification, required by the specifications, drawings, or by governing authorities, except for such off-site inspections delineated as City's responsibility pursuant to the Contract Documents.

3. Before Acceptance of the Project, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to City.

6.15. UTILITY USAGE

1. All temporary utilities, including but not limited to electricity, water, gas, and telephone, used on the Work shall be furnished and paid for by Contractor. Contractor shall Provide necessary temporary distribution systems, including meters, if necessary, from distribution points to points on The Work where the utility is needed. Upon completion of The Work, Contractor shall remove all temporary distribution systems.

2. Contractor shall provide necessary and adequate utilities and pay all costs for water, electricity, gas, oil, and sewer charges required for completion of the Project.

3. All permanent meters Installed shall be listed in the Contractor’s name until the Work is accepted.

4. If the Contract is for construction in existing facilities, Contractor may, with prior written Approval of City, use City’s existing utilities by compensating City for utilities used by Contractor.

6.16. INSPECTION FEES FOR PERMANENT UTILITIES
All inspection fees and other municipal charges for permanent utilities including, but not limited to, sewer, electrical, phone, gas, water, and irrigation shall be paid for by City. Contractor shall be responsible for arranging the payment of such fees, but inspection fees and other municipal fees relating to permanent utilities shall be paid by City. Contractor may either request reimbursement from City for such fees, or shall be responsible for arranging and coordination with City for the payment of such fees.

6.17. TRENCHES

1. Trenches Five Feet or More in Depth. The Contractor shall submit to City, in advance of excavation, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from the hazard of caving ground during the excavation of any trench or trenches five feet or more in depth. If the plan varies from shoring system standards, the plan shall be prepared by a registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
133

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 31 2. Excavations Deeper than Four Feet. If work under this Contract involves digging trenches or other excavation that extends deeper than four feet below the surface, Contractor shall promptly, and before the following conditions are disturbed, notify City, in writing, of any:

1. Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.

2. Subsurface or latent physical conditions at the site differing from those indicated.

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract.

City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of The Work, shall issue a change order under the procedures described in the Contract Documents.

In the event that a dispute arises between City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of The Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.

6.18. DIVERSION OF RECYCLABLE WASTE MATERIALS
In compliance with the applicable City’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests, with an electronic copy Christine Groves, Administrative Services Manager, Public Works at [email protected], or as otherwise directed by the City. Contractor shall complete and execute any certification forms required by City or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of the Contractor.

6.19. REMOVAL OF HAZARDOUS MATERIALS
Should Contractor encounter material reasonably believed to be polychlorinated biphenyl (PCB) or other toxic wastes and hazardous materials which have not been rendered harmless at the Project site, the Contractor shall immediately stop work at the affected Project site and shall report the condition to City in writing. City shall contract for any services required to directly remove and/or abate PCBs and other toxic wastes and hazardous materials, if required by the Project site(s), and shall not require the Contractor to subcontract for such services. The Work in the affected area shall not thereafter be resumed except by written agreement of City and Contractor.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
134

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 32 6.20. SANITARY FACILITIES
Contractor shall provide sanitary temporary toilet buildings for the use of all workers. All toilets shall comply with all applicable federal, state, and local codes ordinances, and regulations. Toilets shall be kept supplied with toilet paper and shall have workable door fasteners. Toilets shall be serviced no less than once weekly and shall be present in a quantity of not less than 1 per 20 workers as required by CAL-OSHA regulation. The toilets shall be maintained in a sanitary condition at all times. Use of toilet facilities in The Work under construction shall not be permitted. Any other Sanitary Facilities required by CAL-OSHA shall be the responsibility of the Contractor.

6.21. AIR POLLUTION CONTROL
Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes. All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements.

Without limiting the foregoing, Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. Contractor shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in Article 50.

6.22. WATER QUALITY MANAGEMENT AND COMPLIANCE

1. Storm, surface, ground, nuisance, or other waters may be encountered at various times during the Work. Contractor hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.

2. Contractor must keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the City’s ordinances regulating discharges of stormwater; the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.); the California Porter-Cologne Water Quality Control Act (Water Code § 13000 et seq.); and any and all regulations, policies, or permits issued pursuant to any such authority. These include, but are not limited to California Regional Water Quality Control Boards (Santa Ana and San Diego Regions) Order No. R8-2009-0030 (NPDES Permit No. CAS 618030) (“Santa Ana MS4 Permit”), Order No. R8-2009-0045, Order No. R9- 2013-0001 as amended by Order Nos. R9-2015-0001 and R9-2015-0100 (NPDES Permit No.

CAS0109266) (“San Diego MS4 Permit”); and State Water Resources Control Board Order No.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
135

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 33 2010-0014-DWQ, Order No. 2009-0009-DWQ, and Order No. 2012-0006-DWQ (NPDES Permit No. CAS000002) (“Construction General Permit”), and any amendment or renewal thereof.

3. Contractor must comply with the lawful requirements of the City, and any other municipality, drainage district, or other local agency with jurisdiction over the location where the Work is to be conducted, regarding discharges of stormwater to separate storm drain systems or watercourses. These requirements include but are not limited to, all applicable requirements of the Orange County Drainage Area Management Plan (“DAMP”), the City of Lake Forest Local Implementation Plan (“LIP”), and the Erosion and Sediment Control Plan. The DAMP contains requirements related to the design and construction of public projects. Contractor must be familiar with the DAMP, and the LIP and must comply with the requirements as specified therein. In the event the DAMP and LIP are revised or replaced in accordance with the requirements of a state or federal law, rule or permit that impacts the performance of the Work, Contractor must comply with the revised or replaced requirements.

1. A copy of the DAMP is available on the internet at:
http://www.ocwatersheds.com/documents/damp/mapplan

2. A copy of the LIP is available on the internet
at: https://www.lakeforestca.gov/en/departments/public-works/environmental-compliance

4. Contractor is required to comply with all aspects of the Construction General Permit for all projects that involve construction on or disturbance of one acre or more of land or which are part of a larger common area of development.

5. City may require Contractor to file the Notice of Intent and obtain coverage for the Project under the Construction General Permit. This may include filing all necessary documentation including the Permit Registration Documents (“PRDs”) through the Stormwater Multiple Applications and Report Tracking System (SMARTS); preparing and implementing a Storm Water Pollution Prevention Plan (“SWPPP”) for the Work site; implementing all other provisions, and monitoring and reporting requirements required by the Construction General Permit; and providing a Qualified SWPPP Developer and Qualified SWPPP Practitioner, as necessary for all Work site activities, including but not limited to preparation and submittal of all reports, plans, inspections, and monitoring information in compliance with the Construction General Permit.

City retains the right to develop its own documentation for the project site, including but not limited to the SWPPP, and in the alternative may require Contractor to adopt and implement portions of the City-developed SWPPP. Specific requirements for the Work site shall be set forth in the Special Conditions. Contractor shall include all costs of compliance with specified requirements in the Contract amount.

6. For those Work sites where construction activity results in the disturbance of less than one acre of total land area and/or do not need coverage under the Construction General Permit, the Contractor is responsible for preparing and implementing an Erosion and Sediment Control Plan Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
136

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 34 in accordance with the Santa Ana MS4 Permit and San Diego MS4 Permit and any amendment or renewal thereof, the City’s LIP and Orange County DAMP and any revision or replacement thereof.

7. Notwithstanding the above, before any PRDs, SWPPP, or other Construction General Permit related document may be submitted to the State Water Resources Control Board or implemented on the Work site, it must first be reviewed by the City and/or the City’s designee, who retains the right to reject or require revisions thereto. The City expressly reserves the right to procure coverage under the Construction General Permit for the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise fails to proceed in a manner that complies with the requirements of the Construction General Permit. The City additionally reserves the right to hire additional contractors to maintain compliance at the Work site. Whether Contractor has adequately maintained compliance with the Construction General Permit shall be the City’s sole determination. Any costs incurred by the City in procuring coverage under the Construction General Permit, or drafting and/or implementing a SWPPP for the Work site shall be paid by Contractor.

8. Failure to comply with laws, regulations, and ordinances listed in this Article 22 is a violation of federal and state law. Notwithstanding any other indemnity contained in this Agreement, Contractor agrees to indemnify and hold harmless the City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, losses or liabilities of any kind or nature which the City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the laws, regulations, and ordinances listed above, arising out of or in connection with the Work, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers.

9. City reserves the right to defend any enforcement action or civil action brought against the City for Contractor’s failure to comply with any applicable water quality law, regulation, or policy.

Contractor agrees to be bound by, and to reimburse the City for the costs associated with, any enforcement action and/or settlement reached between the City and any relevant enforcement entity.

10. City may seek damages from Contractor for delay in completing the Work in accordance with the Contract Documents, caused by Contractor’s failure to comply with the laws, regulations and policies described in this Article 22, or any other relevant water quality law, regulation, or policy.

6.23. CLEANING UP

1. Contractor at all times shall keep premises free from debris such as waste, rubbish, and excess materials and equipment. Contractor shall not store debris under, in, or about the premises.

Upon completion of Work, Contractor shall clean the interior and exterior of the building or Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
137

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 35 improvement including fixtures, equipment, walls, floors, ceilings, roofs, window sills and ledges, horizontal projections, and any areas where debris has collected so surfaces are free from foreign material or discoloration. Contractor shall clean and polish all glass, plumbing fixtures, and finish hardware and similar finish surfaces and equipment and contractor shall also remove temporary fencing, barricades, planking and construction toilet and similar temporary facilities from site. Contractor shall also clean all buildings, asphalt and concrete areas to the degree necessary to remove oil, grease, fuel, or other stains caused by Contractor operations or equipment.

2. Contractor shall fully clean up the site at the completion of The Work. If the Contractor fails to immediately clean up at the completion of The Work, City may do so and the cost of such clean up shall be charged back to the Contractor.

6.24. LAYOUT AND FIELD ENGINEERING
All field engineering required for laying out The Work and establishing grades for earthwork operations, location and alignment of any and all site elements (buildings, paving, walks, fencing, furnishings, etc.) shall be furnished by the Contractor at its expense. A digital AutoCAD (version 2011) file shall be provided to the Contractor by the City indicating the location and layout of all site elements for the use by the Contractors surveyor. Layout shall be done by a registered civil engineer or a licensed land surveyor Approved by the Engineer. Any surveying necessary to establish the grade and line of the work is to be done by a properly licensed land surveyor retained by the contractor. Any required “as-built” drawings of the Work shall be prepared by the registered civil engineer.

6.25. EXCESSIVE NOISE

1. The Contractor shall use only such equipment on the work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by CAL-OSHA.

2. The Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.

6.26. TESTS AND INSPECTIONS

1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or public authority require any part of The Work to be tested or Approved, Contractor shall provide the Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
138

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 36 Engineer at least two (2) working days notice of its readiness for observation or inspection. If inspection is by a public authority other than City, Contractor shall promptly inform City of the date fixed for such inspection. Required certificates of inspection (or similar) shall be secured by Contractor. Costs for City testing and City inspection shall be paid by City. Costs of tests for Work found not to be in compliance shall be paid by the Contractor.

2. If any Work is done or covered up without the required testing or approval, the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost in compliance with the Contract Documents.

3. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by City, and not by Contractor. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.

4. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify City so that City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into The Work.

5. If the manufacture of materials to be inspected or tested will occur in a plant or location outside the geographic limits of City, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging.

6. Reexamination of Work may be ordered by City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, City shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.

6.27. PROTECTION OF WORK AND PROPERTY

1. The Contractor shall be responsible for all damages to persons or property that occur as a result of The Work. Contractor shall be responsible for the proper care and protection of all materials delivered and Work performed until completion and final Acceptance by City. All Work shall be solely at the Contractor’s risk. Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed. Contractor shall erect and properly maintain at all times, as required by field conditions and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
139

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 37 2. In an emergency affecting safety of life or of work or of adjoining property, Contractor, without special instruction or authorization from the Engineer, is hereby permitted to act to prevent such threatened loss or injury; and Contractor shall so act, without appeal, if so authorized or instructed by the Engineer or City. Any compensation claimed by Contractor on account of emergency work shall be determined by and agreed upon by City and the Contractor.

3. Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions.

4. Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by The Work operations. Contractor shall:

1. Enclose the working area with a substantial barricade, and arrange work to cause minimum amount of inconvenience and danger to the public.

2. Provide substantial barricades around any shrubs or trees indicated to be preserved.

3. Deliver materials to the Project site over a route designated by the Engineer.

4. Provide any and all dust control required and follow the Applicable air quality regulations as appropriate. If the Contractor does not comply, City shall have the immediate authority to provide dust control and deduct the cost from payments to the Contractor.

5. Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or directions of the Engineer. Contractor shall not unreasonably encumber the Project site with its materials.

6. Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by an approved civil engineer or land surveyor, at no cost to City.

7. Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to City.

8. Preserve and protect from injury all buildings, pole lines and all direction, warning and mileage signs that have been placed within the right-of-way.

9. At the completion of work each day, leave the Project site in a clean, safe condition.

10. Comply with any stage construction and traffic handling plans. Access to residences and businesses shall be maintained at all times.

5. These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the Work involved in the preservation of life, safety and property Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
140

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 38 as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefore.

6. Should damage to persons or property occur as a result of The Work, Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. City shall be entitled to inspect and copy any such documentation, video, or photographs.

6.28. CONTRACTORS MEANS AND METHODS
Contractor is solely responsible for the means and methods utilized to Perform The Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.

6.29. INSPECTOR’S FIELD OFFICE (NOT USED)

1. The Contractor shall be responsible for providing the inspector’s field office. The Office shall be a substantial waterproof construction with adequate natural light and ventilation by means of stock design windows. Door shall have a key type lock or padlock clasp. The office shall have heating and air conditioning and shall be equipped with a telephone, a telephone answering machine, and a fax machine at Contractor’s expense.

2. A table satisfactory for the study of plans and two chairs shall be Provided by Contractor.

Contractor shall Provide and pay for adequate electric lights, local telephone service, and adequate heat and air conditioning for the field office until authorized removal.

6.30. AUTHORIZED REPRESENTATIVES
City shall designate representatives, who shall have the right to be present at the Project site at all times. City may designate an inspector who shall have the right to observe all of the Contractor’s Work.

The inspector is not authorized to make changes in the Contract Documents. The inspector shall not be responsible for the Contractor’s failure to carry out The Work in accordance with the Contract Documents. Contractor shall provide safe and proper facilities for such access.

6.31. HOURS OF WORK

1. Eight (8) hours of work shall constitute a legal day’s work. The Contractor and each subcontractor shall forfeit, as penalty to City, twenty-five dollars ($25) for each worker employed in the execution of Work by the Contractor or any subcontractor for each day during which such worker is required or permitted to work more than eight (8) hours in any one day and forty (40) hours in any week in violation of the provisions of the Labor Code, and in particular, Section 1810 to Section 1815, except as provided in Labor Code Section 1815.

2. Unless otherwise provided in the Special Conditions, Work shall be accomplished on a regularly scheduled eight (8) hour per day work shift basis, Monday through Friday, between the hours of 7:00 a.m. and 5:00 p.m.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
141

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 39 3. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project site, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on City-observed holidays, unless otherwise Approved by the Engineer:

1. Powered Vehicles

2. Construction Equipment

3. Loading and Unloading Vehicles

4. Domestic Power Tool.

6.32. PAYROLL RECORDS

1. Pursuant to Labor Code Section 1776, the Contractor and each subcontractor shall maintain weekly certified payroll records showing the name, address, social security number, work classification, straight time and overtime hours paid each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed in connection with the work. Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor shall also require subcontractor(s) to certify weekly payroll records under penalty of perjury.

2. In accordance with Labor Code section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (“DIR”) on a weekly basis and in the format prescribed by the DIR, which may include electronic submission. Contractor shall comply with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement.

3. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by City. The Contractor shall also provide the following:

1. A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.

2. A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the Department of Industrial Relations (“DIR”).

4. The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.

5. Any copy of records made available for inspection and furnished upon request to the public shall be marked or obliterated in such a manner as to prevent disclosure of an individual’s name, address, and social security number. The name and address of the Contractor or any subcontractor shall not be marked or obliterated.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
142

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 40 6. In the event of noncompliance with the requirements of this Section, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notice specifying any item or actions necessary to ensure compliance with this section. Should noncompliance still be evident after such ten (10) day period, the Contractor shall, as a penalty to City, forfeit one hundred dollars ($100.00) for each day, or portion thereof, for each worker until strict compliance is effectuated. Upon the request of the DIR, such penalties shall be withheld from contract payments.

6.33. PREVAILING RATES OF WAGES

1. The Contractor is aware of the requirements of Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Agreement from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov/dlsr/. In the alternative, the Contractor may view a copy of the prevailing rates of per diem wages at City. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.

2. The Contractor and each subcontractor shall forfeit as a penalty to City not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the stipulated prevailing wage rate for any work done by him, or by any subcontract under him, in violation of the provisions of the Labor Code. The difference between such stipulated prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the stipulated prevailing wage rate shall be paid to each worker by the Contractor.

3. Contractor shall post, at appropriate conspicuous points on the Project site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
143

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 41 6.34. EMPLOYMENT OF APPRENTICES
The Contractor’s attention is directed to the provisions of Sections 1777.5, 1777.6, and 1777.7 of the Labor Code concerning employment of apprentices by the Contractor or any subcontractor. The Contractor shall obtain a certificate of apprenticeship before employing any apprentice pursuant to Section 1777.5, 1777.6, and 1777.7 of the Labor Code. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, the Administrator of Apprenticeships, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

6.35. NONDISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY
Pursuant to Labor Code Section 1735 and other applicable provisions of law, the Contractor and its subcontractors shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap.

6.36. LABOR/EMPLOYMENT SAFETY
The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4.

6.37. INSURANCE
Contractor agrees to procure and maintain, at Contractor’s expense all insurance specified in Appendix A attached hereto and by this reference incorporated herein. Contractor shall require all subcontractors to carry the same policies and limits of insurance that the Contractor is required to maintain, unless otherwise approved in writing by the City.

6.38. TIME FOR COMPLETION AND LIQUIDATED DAMAGES

1. Time for Completion/Liquidated Damages. Work shall be commenced within ten (10) days of the date stated in City’s Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. City is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by City’s receipt or acceptance of the Contractor’s proposed earlier completion date. Furthermore, Contractor shall not, under any circumstances, receive additional compensation from City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date. If The Work is not completed as stated in the Contract Documents, it is understood that City will suffer damage. In accordance with Government Code section 53069.85, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to City as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each day of delay until The Work is fully completed.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
144

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 42 Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages.

2. Inclement Weather. Contractor shall abide the Engineer’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule.

3. Extension of Time. Contractor shall not be charged liquidated damages because of any delays in completion of The Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its subcontractors or suppliers). Contractor shall within five (5) Days of identifying any such delay notify City in writing of causes of delay. City shall ascertain the facts and extent of delay and grant extension of time for completing The Work when, in its judgment, the facts justify such an extension. Time extensions to the Project shall be requested by the Contractor as they occur and without delay. No delay claims shall be permitted unless the event or occurrence delays the completion of the Project beyond the Contract completion date.

4. No Damages for Reasonable Delay. City’s liability to Contractor for delays for which City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable City delay, including delays caused by items that are the responsibility of City pursuant to Government Code section 4215, shall be based on actual costs only, no proportions or formulas shall be used to calculate any delay damages.

5. Jeronimo Road Widening– Forest Glenn Temporary Construction EasementCompletion of construction activities on the Jeronimo Road Widening project shall be prioritized throughout the course of construction. A 6 month temporary construction easement has been procured for which all work associated with the Forest Glenn property must be completed within. TCE documents are included in Appendix C for the Contractor’s reference. TCE duration will be measured in calendar days and will initiate on the first day for which access is obtained or work is conducted on the Forest Glenn Property. Upon initiation of the TCE, additional working days for weather and other causes will not be allowed and all work must be completed within the 6 calendar month duration.

6.39. COST BREAKDOWN AND PERIODIC ESTIMATES
Contractor shall furnish on forms Approved by City:

1. Within ten (10) Days of award of the Contract a detailed estimate giving a complete breakdown of the Contract price;

2. A monthly itemized estimate of Work done for the purpose of making progress payments. In order for City to consider and evaluate each progress payment application, the Contractor shall Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
145

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 43 submit a detailed measurement of Work performed and a progress estimate of the value thereof before the tenth (10th) Day of the following month.

3. Contractor shall submit, with each of its payment requests, an adjusted list of actual quantities, verified by the Engineer, for unit price items listed, if any, in the Bid Form.

4. Following City’s Acceptance of the Work, the Contractor shall submit to City a written statement of the final quantities of unit price items for inclusion in the final payment request.

5. City shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.

Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.

6.40. MOBILIZATION

1. When a bid item is included in the Bid Form for mobilization, the costs of Work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress estimate (“Initial Mobilization”). When no bid item is provided for “Initial Mobilization,” payment for such costs will be deemed to be included in the other items of The Work.

2. Payment for Initial Mobilization based on the lump sum provided in the Bid Form, which shall constitute full compensation for all such Work. No payment for Initial Mobilization will be made until all of the listed items have been completed to the satisfaction of the Engineer. The scope of the Work included under Initial Mobilization shall include, but shall not be limited to, the following principal items:

1. Obtaining and paying for all bonds, insurance, and permits.

2. Moving on to the Project site of all Contractor’s plant and equipment required for first month’s operations.

3. Installing temporary construction power, wiring, and lighting facilities.

4. Establishing fire protection system.

5. Developing and installing a construction water supply.

6. Providing and maintaining the field office trailers for the Contractor and the Engineer, complete, with all specified furnishings and utility services including telephones, telephone appurtenances, computer and printer, and copying machine.

7. Providing on-site communication facilities for the Owner and the Engineer, including telephones, radio pagers, and fax machines.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
146

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 44 8. Providing on-site sanitary facilities and potable water facilities as specified per Cal-OSHA and these Contract Documents.

9. Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work.

All such storage shall meet manufacturer’s specified storage requirements, and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security.

10. Arranging for and erection of Contractor’s work and storage yard.

11. Posting all OSHA required notices and establishment of safety programs per Cal-OSHA.

12. Full-time presence of Contractor’s superintendent at the job site as required herein.

13. Submittal of Construction Schedule as required by the Contract Documents.

6.41. PAYMENTS

1. City shall make monthly progress payments following receipt of undisputed and properly submitted payment requests. Contractor shall be paid a sum equal to ninety-five percent (95%) of the value of Work performed up to the last day of the previous month, less the aggregate of previous payments, except where the City has adopted a finding that the Work done under the Contract is substantially complex, and then the Contractor shall be paid a sum equal to ninety percent (90%) of the value of the Work performed up to the last day of the previous month, less the aggregate of previous payments.

2. The Contractor shall, after the full completion of The Work, submit a final payment application.

All prior progress estimates shall be subject to correction in the final estimate and payment.

3. Unless otherwise required by law, the final payment of five percent (5%) of the value of the Work (or ten percent (10%) in the event the City has adopted a finding that the Work under the Contract is substantially complex), if unencumbered, shall be paid no later than sixty (60) Days after the date of recordation of the Notice of Completion.

4. Acceptance by Contractor of the final payment shall constitute a waiver of all claims against City arising from this Contract.

5. Payments to the Contractor shall not be construed to be an acceptance of any defective work or improper materials, or to relieve the Contractor of its obligations under the Contract Documents.

6. The Contractor shall submit with each payment request the Contractor’s conditional waiver of lien for the entire amount covered by such payment request, as well as a valid unconditional waiver of lien from the Contractor and all subcontractors and materialmen for all work and materials included in any prior invoices. Waivers of lien shall be in the forms prescribed by Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
147

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 45 California Civil Code Section 8132. Prior to final payment by City, the Contractor shall submit a final waiver of lien for the Contractor’s work, together with releases of lien from any subcontractor or materialmen.

6.42. PAYMENTS WITHHELD AND BACKCHARGES

1. In addition to amounts which City may retain under other provisions of the Contract Documents City may withhold payments due to Contractor as may be necessary to cover:

1. Stop Notice Claims.

2. Defective work not remedied.

3. Failure of Contractor to make proper payments to its subcontractors or suppliers.

4. Completion of the Contract if there exists a reasonable doubt that the work can be completed for balance then unpaid.

5. Damage to another contractor or third party.

6. Amounts which may be due City for claims against Contractor.

7. Failure of Contractor to keep the record (“as-built”) drawings up to date.

8. Failure to provide updates on the construction schedule.

9. Site clean up.

10. Failure of the Contractor to comply with requirements of the Contract Documents.

11. Liquated damages.

12. Legally permitted penalties.

2. Upon completion of the Contract, City will reduce the final Contract amount to reflect costs charged to the Contractor, backcharges or payments withheld pursuant to the Contract Documents.

6.43. CHANGES AND EXTRA WORK

1. Change Order Work.

1. City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, and the Contract Price and Contract Time will be adjusted accordingly. All such changes in the Work shall be authorized by Change Order, shall be performed under the applicable conditions of the Contract Documents, and shall be subject to the approval authority requirements of Article 4 of the Contract. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in the Contract amount or the Contract time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
148

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 46 2. All claims for additional compensation to the Contractor shall be presented in writing before the expense is incurred and will be adjusted as provided herein. No work shall be allowed to lag pending such adjustment, but shall be promptly executed as directed, even if a dispute arises. No claim will be considered after the work in question has been done unless a written contract change order has been issued or a timely written notice of claim has been made by Contractor. Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions and provisions of the original Contract.

3. Owner Initiated Change. The Contractor must submit a complete cost proposal, including any change in the Contract time, within seven (7) Days after receipt of a scope of a proposed change order, unless City requests that proposals be submitted in less than seven (7) Days.

4. Contractor Initiated Change. The Contractor must give written notice of a proposed change order required for compliance with the Contract Documents within seven (7) Days of discovery of the facts giving rise to the proposed change order.

5. Whenever possible, any changes to the Contract amount shall be in a lump sum mutually agreed to by the Contractor and City.

6. Price quotations from the Contractor shall be accompanied by sufficiently detailed supporting documentation to permit verification by City.

7. If the Contractor fails to submit the cost proposal within the seven (7) Day period (or as requested), City has the right to order the Contractor in writing to commence the work immediately on a force account basis and/or issue a lump sum change to the contract price in accordance with City’s estimate of cost. If the change is issued based on City estimate, the Contractor will waive its right to dispute the action unless within fifteen (15) Days following completion of the added/deleted work, the Contractor presents written proof that City’s estimate was in error.

8. Estimates for lump sum quotations and accounting for cost-plus-percentage work shall be limited to direct expenditures necessitated specifically by the subject extra work, and shall be segregated as follows:

1. Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the extra work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from Federal, State or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the extra work cost will not be permitted unless the contractor establishes the necessity for such additional costs. Labor costs for equipment Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
149

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 47 operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental.

2. Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight and delivery. Materials cost shall be based upon supplier or manufacturer’s invoice. If invoices or other satisfactory evidence of cost are not furnished within fifteen (15) Days of delivery, then the Engineer shall determine the materials cost, at its sole discretion.

3. Tool and Equipment Use. No payment will be made for the use of small tools, tools which have a replacement value of $1,000 or less. Regardless of ownership, the rates to be used in determining equipment use costs shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, or Caltrans Equipment Rental Rates (without surcharge) at the time the work is performed.

4. Overhead, Profit and Other Charges. The mark-up for overhead (including supervision) and profit on work added to the Contract shall be according to the following:

1. “Net Cost” is defined as consisting of costs of labor, materials and tools and equipment only excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and subcontractors at cost only, without mark-up.

2. For Work performed by the Contractor’s forces the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Net Cost of the Work.

3. For Work performed by a subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Net Cost of the Work to which the Contractor may add five percent (5%) of the subcontractor’s Net Cost.

4. For Work performed by a sub-subcontractor the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Net Cost for Work to which the subcontractor and general contractor may each add an additional five percent (5%) of the Net Cost of the lower tier subcontractor.

5. No additional mark up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by City exceed twenty-five percent (25%) of the Net Cost as defined herein.

9. All of the following costs are included in the markups for overhead and profit described above, and Contractor shall not receive any additional compensation for: Submittals, drawings: field drawings, Shop Drawings, including submissions of drawings; field inspection; General Superintendence; General administration and preparation of cost proposals, schedule analysis, Change Orders, and other supporting documentation; Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
150

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 48 computer services; reproduction services; Salaries of project engineer, superintendent, timekeeper, storekeeper, and secretaries; Janitorial services; Small tools, incidentals and consumables; Temporary on Site facilities (Offices, Telephones, Internet access, Plumbing, Electrical Power, lighting; Platforms, Fencing, Water), Jobsite and Home office overhead or other expenses; vehicles and fuel used for work otherwise included in the Contract Documents; Surveying; Estimating; Protection of Work; Handling and disposal fees; Final cleanup; Other incidental Work; Related warranties.

10. For added or deducted Work by subcontractors, the Contractor shall furnish to City the subcontractor’s signed detailed estimate of the cost of labor, material and equipment, including the subcontractor markup for overhead and profit. The same requirement shall apply to sub-subcontractors.

11. For added or deducted work furnished by a vendor or supplier, the Contractor shall furnish to City a detailed estimate or quotation of the cost to the Contractor, signed by such vendor or supplier.

12. Any change in The Work involving both additions and deletions shall indicate a net total cost, including subcontracts and materials. Allowance for overhead and profit, as specified herein, shall be applied if the net total cost is an extra; overhead and profit allowances shall not be applied if the net total cost is a credit. The estimated cost of deductions shall be based on labor and material prices on the date the Contract was executed.

13. Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the change order for work. No claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify City’s change order form in an attempt to reserve additional rights.

14. If City disagrees with the proposal submitted by Contractor, it will notify the Contractor and City will provide its opinion of the appropriate price and/or time extension. If the Contractor agrees with City, a change order will be issued by City. If no agreement can be reached, City shall have the right to issue a unilateral change order setting forth its determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work.

Such determination shall become final and binding if the Contractor fails to submit a claim in writing to City within fifteen (15) Days of the issuance of the unilateral change order, disputing the terms of the unilateral change order.

15. No dispute, disagreement or failure of the parties to reach agreement on the terms of the change order shall relieve the Contractor from the obligation to proceed with performance of the work, including extra work, promptly and expeditiously.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
151

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 49 16. Any alterations, extensions of time, extra work or any other changes may be made without securing consent of the Contractor’s surety or sureties.

2. Contract Unit Prices

1. Increases more than twenty-five percent (25%) percent. Should the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications exceed the Bid quantity by more than twenty-five percent (25%), payment for the quantity in excess of one hundred twenty-five percent (125%) of the Bid quantity will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the City, or at the option of the Engineer, on the basis of the Extra Work per paragraph (a) above.

2. Decreases of more than twenty-five percent (25%). Should the actual quantity of an item of work covered by a Contract Unit Price, and constructed in conformance with Plans and Specifications, be less than seventy-five percent (75%) of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the City, or at the option of the Engineer, on the basis of the Extra Work per paragraph (a) above; however, in no case will payment be less than would be made for the actual quantity at the Contract Unit Price nor more than would be made for seventy-five percent (75%) of the Bid quantity at the Contract Unit Price.

3. Changes to Contract Time

1. The Contract Time may only be changed by a Change Order.

2. All changes in the Contract Price and/or adjustments to the Contract Times related to each change shall be included in Contractor’s change order proposal described above. All Change Orders must state that the Contract Time is not changed or is either increased or decreased by a specific number of days. Failure to include a change to time shall waive any change to the Contract Time unless the parties mutually agree in writing to postpone a determination of the change to time resulting from the Change Order. No cost or time will be allowed for cumulative effects of multiple changes.

3. Notice of the amount of the request for adjustment in the Contract Time with supporting data shall be delivered within seven (7) Days after such start of occurrence. No extension of time or additional compensation shall be given for a delay if the Contractor failed to give notice in the manner and within the time prescribed.

4. Float is for the benefit of the Project. Float shall not be considered for the exclusive use or benefit of either the City or the Contractor. Any difference in time between the Contractor’s early completion and the Contract Time shall be considered a part of the Project float.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
152

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 50 Contractor shall not be entitled to compensation, and the City will not compensate Contractor, for delays which impact early completion.

5. Contractor’s entitlement to an extension of the Contract Time is limited to City-caused extension of the critical path, reduced by the Contractor’s concurrent delays, and established by a proper time impact analysis. No time extension shall be allowed unless, and then only to the extent that, the City-caused delay extends the critical path beyond the previously approved Contract Time.

1. Contractor shall not be entitled to an adjustment in the Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a subcontractor or supplier shall be deemed to be delays within the control of Contractor.

2. If Contractor is delayed in the performance or progress of the Work by fire, flood, epidemic, abnormal weather conditions (as determined by the City), Acts of God, acts or failures to act of utility owners not under the control of City, or other causes not the fault of and beyond control of the City and Contractor, then Contractor shall be entitled to an time extension when the affected Work is on the critical path. Such a non- compensable adjustment shall be Contractor’s sole and exclusive remedy for such delays. Contractor must submit a timely request in accordance with the requirements of this Article.

6. Requests for Contract Extension: Contractor’s justification for entitlement shall be clear and complete citing specific Contract Document references and reasons on which Contractor’s entitlement is based. At a minimum, each request for a time extension must include:

1. Each request for an extension of Contract Time must identify the impacting event, in narrative form, providing a description of the delay event and sufficient justification as to why the Contractor is entitled to a time extension. Contractor must demonstrate that the delay arises from unforeseeable causes beyond the control and without the fault or negligence of both Contractor and any Subcontractors or Suppliers, or any other persons or organizations employed by any of them or for whose acts any of them may be liable, and that such causes in fact lead to performance or completion of the Work, or specified part in question, beyond the corresponding Contract Times, despite Contractor’s reasonable and diligent actions to guard against those effects.

2. Each request for an extension of Contract Time must include a time impact analysis in CPM format to calculate the impact of the delay event.

7. Contractor’s failure, neglect, or refusal to comply with these requirements, or any portion thereof, shall bar Contractor’s request for extensions of the Contract Time. Such failure, neglect, or refusal prejudices the City’s ability to recognize and mitigate delay, and such failure, neglect, or refusal prevent the timely analysis of requests for extensions of Contract Time, and whether such extensions may be warranted. Contractor hereby waives all rights Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
153

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 51 to extensions of Contract Time due to delays or accelerations that result from or occur during periods of time for which Contractor fails, neglects, or refuses to fully comply with the requirements of this Article.

6.44. OCCUPANCY
City reserves the right to occupy or utilize any portion of The Work at any time before completion, and such occupancy or use shall not constitute Acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.

6.45. RECORD (“AS BUILT”) DRAWINGS

1. Contractor shall prepare and maintain a complete set of record drawings (herein referred to as “as-builts”) and shall require each trade to prepare its own as-builts. The as-builts must show the entire site for each major trade, including but not limited to water, sewer, electrical, data, telephone, cable, fire alarm, gas and plumbing. Contractor shall mark the as-builts to show the actual installation where the installation varies from the Work as originally shown. Contractor shall mark whichever drawings are most capable of showing conditions fully and where shop drawings are used, Contractor must record a cross-reference at the corresponding location on the contract drawings. Contractor shall give particular attention to concealed elements that would be difficult to measure and record at a later date. Contractor shall use colors to distinguish variations in separate categories of The Work.

2. Contractor shall note related change order, request for information , request for proposals, or Architect’s Supplemental Instructions where applicable. Contractor shall organize as-builts into manageable sets, bound with durable paper cover sheets and shall print suitable title, dates and other identification on the cover of each set. Contractor to also provide an electronic version of the as-builts in .pdf or other approved format. The suitability of the as-builts will be determined by the Engineer.

6.46. INDEMNIFICATION
Contractor shall defend (with counsel of City Council’s choosing), indemnify and hold City, its officials, officers, agents, employees, and representatives free and harmless from any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages or injuries, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, to the extent arising out of or incident to any acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Work or this Contract, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorneys fees and other related costs and expenses. To the fullest extent permitted by law, Contractor shall defend, at Contractor’s own cost, expense and risk, with City Council’s choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its officials, officers, agents, employees and representatives. To the extent of its liability, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City, its officials, officers, Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
154

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 52 employees, agents, employees and representatives, in any such suit, action or other legal proceeding.

Contractor shall reimburse City, its officials, officers, agents, employees and representatives for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code Section 2782.

6.47. RESOLUTION OF CONSTRUCTION CLAIMS

1. All public works claims between the Contractor and the City shall be resolved pursuant to the procedures set forth in Public Contract Code section 9204. All public works claims of $375,000 or less which arise between the Contractor and the City shall be resolved in accordance with Public Contract Code sections 20104 et seq. and other applicable law, unless the City has elected to resolve the dispute pursuant to Public Contract Code section 10240 et seq.

2. Contractor shall timely comply with all notices and requests for additional compensation and extensions of time, including but not limited to all requirements of Article 43, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely a change to the Contract Price or Contract Time, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the Contract or at law.

3. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Article shall be construed to be consistent with said statutes.

4. Claims. For purposes of this Article, “Claim” means a separate demand by the Contractor, after a change order duly requested in accordance with Article 49 has been denied by the City, for (1) a time extension, (2) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (3) an amount the payment of which is disputed by the City. A “Claim” does not include any demand for payment for which the Contractor has failed to provide notice, request a change order, or otherwise failed to follow any procedures contained in the Contract Documents.

5. Filing Claims. Claims governed by this Article may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the procedures contained in Article 49, and Contractor’s request for a change has been denied in whole or in part. Claims governed by this Article must be filed no later than fourteen (14) days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. Any claim must be submitted in writing to the City and shall include on its first page the following in 16 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
155

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 53 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing herein is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

6. Supporting Documentation. The Contractor shall submit all Claims in the following format:

1. Summary of claim merit and price, and Contract clause pursuant to which the claim is made.

2. List of documents relating to claim

1. Specifications

2. Drawings

3. Clarifications (Requests for Information)

4. Schedules

5. Other

3. Chronology of events and correspondence

4. Narrative analysis of claim merit

5. Analysis of claim cost, including calculations and supporting documents

6. Analysis of time impact analysis in CPM format if a time extensions is requested

7. Cover letter and certification of validity of the claim, including any claims from subcontractors of any tier, in accordance with the Government Code sections 12650 et seq.

7. City Response to Claim.

1. Upon receipt of a Claim pursuant to this Article, the City shall conduct a reasonable review of the Claim and, within a period not to exceed 45 days of receipt of the claim, or as extended by mutual agreement, shall provide a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the Claim will be processed and made within 60 days after the City issues its written response.

2. If the City needs approval from City Council to provide Contractor a written statement as set forth above, and City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a Claim, the City shall have up to three (3) days following the next publicly noticed meeting of City Council after the 45-day period, or extension, expires to provide Contractor a written statement identifying the disputed portion and the undisputed portion of the Claim.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
156

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 54 3. The City may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses or claims the City may have. If additional information is needed thereafter, it shall be provided upon mutual agreement of the City and the claimant. The City’s written response shall be submitted 30 days (15 days if the Claim is less than $50,000) after receiving the additional documentation, or within the same period of time taken by the claimant to produce the additional information, whichever is greater.

8. Meet & Confer Conference. If the Contractor disputes the City’s response, or if the City fails to respond within the statutory time period(s), the Contractor may so notify the City within 15 days of the receipt of the response or the failure to respond, and demand an informal conference to meet and confer for settlement of those portions of the Claim that remain in dispute. Upon such demand, the City shall schedule a meet and confer conference within 30 Days.

9. Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion thereof remains in dispute, the City shall provide the Contractor with a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 Days after the City issues its written statement. Any portion of the claim that remains in dispute shall be submitted to nonbinding mediation and the City and the Contractor shall equally share the associated mediator fees. The City and Contractor shall mutually agree to a mediator within 10 business Days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.

1. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

2. For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

3. Unless otherwise agreed to by the public entity and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

4. The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
157

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 55 10. Procedures After Mediation. If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference.

11. Civil Actions. The following procedures are established for all civil actions filed to resolve Claims of $375,000 or less:

1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of this Agreement. The mediation process shall provide for the selection within 15 Days by both parties of a disinterested third person as mediator, shall be commenced within 30 Days of the submittal, and shall be concluded within 15 Days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

2. If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

12. Government Code Claim.

1. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code section 900 et seq. prior to filing any lawsuit against the City.

2. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
158

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 56 prerequisite contractual requirements are not otherwise satisfied as specified herein, Contractor shall be barred from bringing and maintaining a valid lawsuit against the City.

3. A Government Code claim must be filed no earlier than the date the Work is completed or the date the Contractor last performs Work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims known to Contractor or that should reasonably by known to Contractor excepting only new unrelated Claims that arise after the Government Code claim is submitted.

13. Non-Waiver. The City’s failure to respond to a claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the claim being deemed rejected in its entirety.

6.48. CITY’S RIGHT TO TERMINATE CONTRACT

1. Termination for Cause.
o City may, without prejudice to any other right or remedy, serve written notice upon Contractor of its intention to terminate this Contract in whole or in part if the Contractor: (i) refuses or fails to prosecute The Work or any part thereof with such diligence as will ensure its completion within the time required; (ii) fails to complete The Work within the required time; (iii) should file a bankruptcy petition or be adjudged a bankrupt; (iv) should make a general assignment for the benefit of its creditors; (v) should have a receiver appointed; (vi) should persistently or repeatedly refuse or fail to supply enough properly skilled workers or proper materials to complete the work; (vii) should fail to make prompt payment to subcontractors or for material or labor; (viii) persistently disregard laws, ordinances, other requirements or instructions of City; or (ix) should violate any of the provisions of the Contract Documents.
o The notice of intent to terminate shall contain the reasons for such intention to terminate.

Unless within ten (10) Days after the service of such notice, such condition shall cease or satisfactory arrangements (acceptable to City) for the required correction are made, this Contract shall be terminated. In such case, Contractor shall not be entitled to receive any further payment until the Project has been finished. City may take over and complete The Work by any method it may deem appropriate. Contractor and its surety shall be liable to City for any excess costs or other damages incurred by City to complete the Project. If City takes over The Work, City may, without liability for so doing, take possession of and utilize in completing The Work such materials, appliances, plant, and other property belonging to the Contractor as may be on the Project site.

2. Termination For Convenience.
o City may terminate performance of The Work in whole or, in part, if City determines that a termination is in City's interest.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
159

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 57 o The Contractor shall terminate all or any part of The Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the convenience of City, the extent of termination, and the effective date of such termination. o After receipt of Notice of Termination, and except as directed by City, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this Termination for Convenience clause, immediately proceed with the following obligations:

1. Stop Work as specified in the Notice.

2. Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents.

3. Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Documents is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety.

4. Terminate all subcontracts to the extent that they relate to the portions of The Work terminated.

5. Place no further subcontracts or orders, except as necessary to complete the remaining portion of The Work.

6. Submit to City, within ten (10) Days from the effective date of the Notice of Termination, all of the documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the Effective Date of the Notice of Termination. Any documentation substantiating costs incurred by the Contractor solely as a result of City's exercise of its right to terminate this Contract pursuant to this clause, which costs the Contractor is authorized under the Contract Documents to incur, shall: (i) be submitted to and received by City no later than thirty (30) Days after the Effective Date of the Notice of Termination; (ii) describe the costs incurred with particularity; and (iii) be conspicuously identified as "Termination Costs Occasioned by City's Termination for Convenience."

7. These provisions are in addition to and not in limitation of any other rights or remedies available to City.

3. Savings Clause. If City terminates Contractor for cause, and if it is later determined that the termination was wrongful, such default termination shall automatically be converted to and treated as a termination for convenience. In such event, Contractor shall be entitled to receive only the amounts payable under this section, and Contractor specifically waives any claim for Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
160

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 58 any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits.

4. Exception. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, City may immediately order Contractor to cease Work on the Project until such safety or liability issues are addressed to the satisfaction of City or the Contract is terminated.

6.49. WARRANTY AND GUARANTEE

1. Contractor warrants that all materials and equipment furnished under this Contract shall be new unless otherwise specified in the Contract Documents; and that all Work conforms to the Contract Document requirements and is free of any defect whether performed by the Contractor or any subcontractor or supplier.

2. Unless otherwise stated, all warranty periods shall begin upon the filing of the Notice of Completion. Unless otherwise stated, the warranty period shall be for one year.

3. The Contractor shall remedy at its expense any damage to City-owned or controlled real or personal property.

4. Contractor shall furnish City with all warranty and guarantee documents prior to final Acceptance of the Project by City.

5. City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days after being notified commence and perform with due diligence all necessary Work. If the Contractor fails to promptly remedy any defect, or damage; the City have the right to replace, repair, or otherwise remedy the defect, or damage at the Contractor’s expense.

6. In the event of any emergency constituting an immediate hazard to health, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, City may undertake at Contractor’s expense, and without prior notice, all Work necessary to correct such condition.

7. With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for Work performed and Materials furnished under this Contract, the Contractor shall:

1. Obtain for City all warranties that would be given in normal commercial practice;

2. Require all warranties to be executed, in writing, for the benefit of City; and

3. Enforce all warranties for the benefit of City, unless otherwise directed in writing by City.

This Article shall not limit City’s rights under this Contract or with respect to latent defects, gross mistakes, or fraud. City specifically reserves all rights related to defective work, including but not limited to the defect claims pursuant to California Code of Civil Procedure Section 337.15.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
161

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 59 6.50. DOCUMENT RETENTION & EXAMINATION

1. In accordance with Government Code Section 8546.7, records of both City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment.

2. Contractor shall make available to City any of the Contractor’s other documents related to the Project immediately upon request of City.

3. In addition to the State Auditor rights above, City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to City, for a period of four (4) years after final payment.

6.51. SOILS INVESTIGATIONS
When a soils investigation report for the Project site is available, such report shall not be a part of the Contract Documents. Any information obtained from such report as to subsurface soil condition, or to elevations of existing grades or elevations of underlying rock, is approximate only and is not guaranteed.

Contractor acknowledges that any soils investigation report (including any borings) was prepared for purposes of design only and Contractor is required to examine the site before submitting its bid and must make whatever tests it deems appropriate to determine the underground condition of the soil.

6.52. SEPARATE CONTRACTS

1. City reserves the right to let other contracts in connection with this Work or on the Project site.

Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs.

2. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the work in place or discrepancies with the Contract Documents.

3. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by City in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any.

Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project. Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer shall decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. City shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
162

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 60 directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project site.

6.53. NOTICE AND SERVICE THEREOF
All notices shall be in writing and either served by personal delivery or mailed to the other party as designated in the Bid Forms. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to City shall be addressed to City as designated in the Notice Inviting Bids unless City designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) Days after being sent by first class mail, whichever is earlier. Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party.

6.54. NOTICE OF THIRD PARTY CLAIMS
Pursuant to Public Contract Code Section 9201, City shall provide Contractor with timely notification of the receipt of any third-party claim relating to the Contract.

6.55. STATE LICENSE BOARD NOTICE
Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

6.56. INTEGRATION

1. Oral Modifications Ineffective. No oral order, objection, direction, claim or notice by any party or person shall affect or modify any of the terms or obligations contained in the Contract Documents.

2. Contract Documents Represent Entire Contract. The Contract Documents represent the entire agreement of City and Contractor.

6.57. ASSIGNMENT
Contractor shall not assign, transfer, convey, sublet, or otherwise dispose of this Contract or any part thereof including any claims, without prior written consent of City. Any assignment without the written consent of City shall be void. Any assignment of money due or to become due under this Contract shall be subject to a prior lien for services rendered or Material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such Materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
163

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 61 6.58. CHANGE IN NAME AND NATURE OF CONTRACTOR’S LEGAL ENTITY Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify City in order that proper steps may be taken to have the change reflected on the Contract.

6.59. ASSIGNMENT OF ANTITRUST ACTIONS
Pursuant to Section 7103.5 of the Public Contract Code, in entering into a public works contract or subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or subcontractor offers and agrees to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (chapter 2 (commencing with Section 16700) of part 2 of division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this Contract or any subcontract. This assignment shall be made and become effective at the time City makes final payment to the Contractor, without further acknowledgment by the parties.

6.60. PROHIBITED INTERESTS
No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.

6.61. LAWS AND REGULATIONS

1. Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified by their terms.

References to specific laws, rules or regulations in this Contract are for reference purposes only, and shall not limit or affect the applicability of provisions not specifically mentioned. If Contractor observes that drawings and specifications are at variance therewith, he shall promptly notify the Engineer in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in work. If Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Engineer, he shall bear all costs arising therefrom.

2. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA regulations.

6.62. PATENT FEES OR ROYALTIES
The Contractor shall include in its bid amount the patent fees or royalties on any patented article or process furnished or used in the Work. Contractor shall assume all liability and responsibility arising from the use of any patented, or allegedly patented, materials, equipment, devices or processes used in or incorporated with The Work, and shall defend, indemnify and hold harmless City, its officials, officers, Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
164

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 62 agents, employees and representatives from and against any and all liabilities, demands, claims, damages, losses, costs and expenses, of whatsoever kind or nature, arising from such use.

6.63. OWNERSHIP OF DRAWING
All Contract Documents furnished by City are City property. They are not to be used by Contractor or any subcontractor on other work nor shall Contractor claim any right to such documents. With exception of one complete set of Contract Documents, all documents shall be returned to City on request at completion of The Work.

6.64. NOTICE OF TAXABLE POSSESSORY INTEREST
In accordance with Revenue and Taxation Code Section 107.6, the Contract Documents may create a possessory interest subject to personal property taxation for which Contractor will be responsible.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
165

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 63 7. SECTION 00750 SPECIAL CONDITIONS

7.1. SPECIFIC MATERIALS
City has not made findings pursuant to Public Contract Code Section 3400(b) regarding the use of specific materials, products, things, and/or services that must be utilized for the Project.

7.2. PROJECT RETENTION; SUBSTANTIAL COMPLEXITY

2. NOT USED

7.3. STORMWATER SPECIFICATIONS

City has not prepared a SWPPP or other stormwater compliance plan for the Project site. Contractor is responsible for filing the PRDs and for obtaining coverage under the Permit. This includes preparing and implementing a SWPPP for the Project site, and coordinating all submittals with the City's Legally Responsible Person and Authorized Signatory as those terms are defined in the Permit. Before any PRDs, SWPPP, or other Permit related document may be submitted to the State Board or implemented on the Project site, it must first be reviewed by the City, who retains the right to reject or require revisions thereto. If the Project is less than one acre in size, Contractor is still required to develop and implement an Erosion and Sediment Control Plan for the Work site. Contractor must include all costs of compliance with specified requirements in the Contract amount.

7.4. PRE-CONSTRUCTION MEETING
After, or upon, notification of Contract Award, the Engineer will set the time and location for the Pre- Construction Meeting. Attendance of the Contractor's management personnel responsible for the management, administration, and execution of the project is mandatory for the meeting to be convened. Failure of the Contractor to have the Contractor 's responsible project personnel attend the Pre-Construction Meeting will be grounds for default by Contractor. No separate payment will be made for the Contractor 's attendance at the meeting. The Notice to Proceed will only be issued on or after the completion of the Pre-Construction meeting.

7.5. MODIFICATION OF HOURS OF WORK
The Contractor’s activities shall be confined to Monday through Friday, excluding City holidays and weekends. The Contractor’s activities shall be confined to the hours between 8:00 a.m. and 5:00 p.m.

Working hours on arterial streets, including closure of travel lanes, will be allowed only between the hours of 9:00 a.m. and 3:00 p.m. Deviation from these hours will not be permitted without written request and the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested, or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates, including Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
166

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 64 benefits, overhead, and travel time. The service fees will be deducted from any amounts due the Contractor.

7.6. STREET CLOSURES, DETOURS, BARRICADES
Existing electrical systems (traffic signal, highway and street lighting, flashing beacon, sign illumination and other facilities), or approved temporary replacements thereof, shall be kept in effective operation for the benefit of the traveling public during the progress of the work, except when shutdown is permitted to allow for alterations or final removal of the systems. The traffic signal shutdowns shall be limited to normal working hours, or shall be as specified in the special provisions. Lighting system shutdowns shall not interfere with the regular lighting schedule, unless otherwise permitted by the Engineer. The Contractor shall notify the Engineer prior to performing any work on existing systems.

The Contractor shall notify the City prior to any operational shutdown of a traffic signal. The City will:

1. Continue the operation and maintenance of existing electrical facilities.

2. Continue to provide for electrical energy for the operation of existing electrical facilities.

3. Repair or replace existing facilities damaged by public traffic.

4. Pay the cost of electrical energy for the operation of existing or new facilities that are undergoing the functional tests.

The Contractor shall ascertain the exact location and depth of existing detectors, conduits, pull boxes and other electrical facilities before using any tools or equipment that may damage those facilities or interfere with any electrical system.

Where damage is caused by the Contractor’s operations, the Contractor shall, at the Contractor’s expense, repair or replace damaged facilities promptly in conformance with these specifications. If any existing loop conductor, including the portion leading to the detector handhole or termination pull box, is damaged by the contractor’s operations, the Contractor shall immediately notify the Engineer. The affected detectors shall be replaced at the Contractor’s expense and as directed by the Engineer within 24 hours. If the Contractor fails to complete the repairs within this period, the repairs will be made by the City at the Contractor’s expense.

Should the Contractor fail to perform the required repairs or replacements, the cost of performing the repairs or replacements will be deducted from any moneys due or to become due to the Contractor.

Where roadways are to remain open to traffic and existing lighting systems are to be modified, the lighting systems shall remain in operation and the final connection to the modified circuit shall be made so that the modified circuit will be in operation by nightfall of the same day.

Temporary electrical installations shall be kept in effective operation until the temporary installations are no longer required for the traveling public.

During traffic signal system shutdown the Contractor shall place “STOP AHEAD” and “STOP” signs to direct vehicle and pedestrian traffic through the intersection. All signal faces shall be covered when the system is shutdown overnight. Temporary “STOP AHEAD” and “STOP” signs shall be either covered or removed when the system is turned on.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
167

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 65 “STOP AHEAD” and “STOP” signs shall be furnished by the Contractor and shall conform to the provisions in Caltrans Standard Specification section 12-3.06, “Construction Area Signs.” Minimum size of “STOP” signs shall be 30 inches.

One “STOP AHEAD” sign and one “STOP” sign shall be placed for each direction of traffic. For two-lane approaches, 2 “STOP” signs shall be placed. Location of the signs shall be as directed by the Engineer.

Barricades shall be equipped with flashing warning lights. All power required devices shall be operated by batteries, rather than generators.

Street closures will not be allowed, except as specifically permitted by the Engineer. Traffic control shall be approved by the Engineer.

Lane transitions shall conform to the latest edition of the California Manual on Uniform Traffic Control Devices (MUTCD).

Temporary traffic channelization shall be accomplished with barricades or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed on finished pavement surfaces, which are to remain. The Contractor shall prepare any traffic control or detour plans that may be required as directed by the Engineer. The Contractor shall submit Traffic Control Plans for all work on arterial roads, prepared and signed by a California Registered Civil or Traffic Engineer at least ten (10) working days prior to commencing work.

The Contractor shall schedule an employee to police the temporary delineators and barricades within the travel way during weekday, nonworking hours, and over Saturdays, Sundays, and holidays. Any corrective work required to be done by City forces shall be back charged to the Contractor based on the actual costs, plus City overhead and withheld from the final payment.

All costs to the Contractor for street closures, detours, barricades, and associated plans shall be included in various lump sum contract bid items, and no separate payment will be made therefore.

7.7. SURVEY CONTROL AND REFERENCE POINTS
Prior to the start of construction, the Contractor (its licensed surveyor or qualified engineer) shall locate all monuments (both of record and not of record), bench marks, and centerline ties within one hundred feet of the construction activity. Additional ties to monuments shall be set when ties are missing (min. four ties per monument). The Contractor shall prepare and submit for review to the City Engineer separate tie sheets and Corner Record sheets (monuments not of record shall have only tie sheets prepared). Corner Records shall conform to the County Engineers’ Association of California’s “Guide to the Preparation of Records of Survey and Corner Records” document as provided by the County of Orange Land Surveyor’s Office and on file in the City of Lake Forest City Engineers Office. Upon review by the City Engineer, the Contractor shall file the Corner Records with the County of Orange Land Surveyor’s Office. Certified Corner Records shall be filed with the City Engineer. Prior to final Acceptance by the City, the Contractor shall re-survey all field monuments and centerline ties within the construction zone, prepare tie sheets and corner record sheets as indicated above, and file them with the City Engineer for review. After review by the City Engineer, the land surveyor shall file the corner Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
168

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 66 records with the County Land Surveyors Office, and file certified copies of the corner records with the City Engineer.

All survey monuments removed or altered as a result of construction shall be reset, corner records shall be filed with the County of Orange Land Surveyor’s Office, and approved final corner records shall be filed with the City Engineer. Centerline ties removed as a result of construction shall be reset and tie sheets filed with the City Engineer.

Contractor shall provide a letter of certification for all monuments having four or more existing ties which are within 0.02 ft plus or minus of the original City tie sheet records. When several monuments and ties appear on one tie sheet and one of the ties has changed the land surveyor shall re-measure all of the ties and re-file a new ties sheet with the City as required herein.

County of Orange permanent and temporary bench marks within the construction zone shall be located by survey, and the Contractor shall send a written notification of impending construction to the County of Orange Land Surveyor’s Office two weeks prior to construction.

7.8. UTILITY DELAYS
The Contractor will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, noted, and completed in accordance with the contract documents. The Contractor shall ascertain further detailed information to coordinate his/her/its work to this effect.

All notification of utility companies shall be by the Engineer based on Contractor’s request as submitted to the Engineer at least twenty-four (24) hours in advance of the needed work. Any costs for delay of the Contractor of utility companies in this regard shall be assigned to the Contractor, if these costs are a result of the Contractor’s request being untimely in any respect, except for the utility company not responding at their agreed time.

7.9. WORKING DAY
The Contractor’s activities shall be confined to Monday through Friday, excluding City holidays and weekends. The Contractor’s activities not affecting arterial traffic lanes shall be confined to the hours between 8:00 a.m. and 5:00 p.m. Working hours in residential streets will be allowed only between the hours of 8 a.m. and 5 p.m., unless otherwise noted in the attached Area Maps that indicate which streets will involve night work. Working hours on arterial streets, involving closure of travel lanes, will be allowed only between the hours of 9:00 a.m. and 3:00 p.m. Deviation from these hours will not be permitted without written request and the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested, or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates, including benefits, overhead, and travel time. The service fees will be deducted from any amounts due the Contractor.

7.10. WATER POLLUTION CONTROL
In order to comply with the water quality permit requirements, the Drainage Area Management Plan (DAMP) and a Local Implementation Plan (LIP) have been developed. The LIP contains Model Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
169

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 67 Maintenance Procedures (MMPs) and Best Management Practices (BMPs). The applicable MMPs/BMPs are that the Contractor shall sweep up and dispose of all spoils and trash prior to leaving the job site each day as required in Fixed Facility Maintenance Procedures FP3, FP4, FF8, and FF10 in the Water Quality Procedures Section of the Conditions of the Contract. The MMPs and BMPs apply to all work to be performed. The MMPs and BMPs contain pollution prevention and source control techniques to minimize the impact of the work performed on dry-weather urban runoff, stormwater runoff, and downstream water quality.

7.11. PUBLIC CONVIENENCE AND SAFETY
Traffic and Access. The Contractor shall notify the occupants of all affected properties at least seventy- two (72) hours prior to any temporary obstruction of access. No parking signs shall be posted on residential streets at least seventy-two (72) hours prior to the start of work. Vehicular access to property line shall be maintained, except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed, except as permitted by the Engineer.

At least one twelve foot (12') wide traffic lane shall be provided for each direction of travel on all streets at all times, except as permitted by the Engineer. The traffic lanes shall be maintained on pavement, and shall remain unobstructed.

The Contractor shall not perform work on any street on the same day as refuse collection occurs, unless approved by the Engineer in writing in advance of such work.

Clearances from traffic lanes shall be five feet (5’) from the edge of any excavation and two (2) feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

One four foot (4') wide paved pedestrian walkway shall be maintained in the parkway area on each side of all streets, except as specifically exempted by the Engineer. The clearance from the pedestrian walkway to any traffic lane shall be five feet (5')."

7.12. TIME OF COMPLETION
The time of completion of this project is 150 Working Days from the commencement date indicated on the Notice to Proceed.

7.13. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS The Contractor shall repair or replace all existing improvements which are not designated for removal (e.g., curb and gutter, sidewalks, driveways, sprinkler systems, pavement, structures, etc.) which are damaged or removed as a result of its operations. Repair of sidewalks and pavement shall be in accordance with APWA Standard Plan 113-1 Sidewalk & Driveway Replacement and the City of Lake Forest Trench and Backfill and Roadway Repair detail.

7.14. NOTIFICATION
The Contractor shall notify the City and the owners of all utilities and substructures not less than forty- eight (48) hours prior to starting construction. The following list of names and telephone numbers is intended for the convenience of the CONTRACTOR and is not guaranteed to be complete or correct:

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
170

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 68 CITY OF LAKE FOREST (949) 282-5233
Attention: Mr. Doug Erdman, P.E., Engineering Services Manager/ Asst. City Engineer ([email protected])
SOUTHERN CALIFORNIA EDISON COMPANY (949) 445-9005
Attention: Claudene Duke ([email protected])
AT&T (714) 618-9132
Attention: Valentina Gipson ([email protected])
COX COMMUNICATIONS (949) 279-8050
Attention: Michael Kane ([email protected])
After hours – SOC (Systems Operations Center) (949) 546-4100 THE GAS COMPANY (714) 643-3061
Attention: Juan Gonzalez ([email protected])
IRVINE RANCH WATER DISTRICT (949) 453-5694
Attention: Belisario Rios ([email protected])
EL TORO WATER DISTRICT (949) 837-7050 x251
Attention: Rory Harnisch ([email protected])
SANTA MARGARITA WATER DISTRICT (949) 433-6734
Attention: Frank Sanchez ([email protected])
TRAFFIC SIGNAL MAINTENANCE (BEAR ELECTRICAL) (714) 215-6489 Attention: Art Torres ([email protected])
UNDERGROUND SERVICE ALERT (800) 422-4133

EMERGENCY INFORMATION
The names, addresses, and telephone numbers of the CONTRACTOR and Subcontractors, or their representatives, shall be filed with the Engineer and the County Sheriff's Department or the CITY Police Department prior to beginning work.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
171

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 69 8. SECTION 00800 TECHNICAL CONDITIONS

8.1. TECHNICAL CONDITIONS
A. THESE ADDITIONS, DELETIONS, AND AMENDMENTS MODIFY THE SPECIFICATIONS IN THE “STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION”, 2021 EDITION.

B. THESE ADDITIONS, DELETIONS, AND AMENDMENTS SHALL TAKE PRECEDENCE IN THE EVENT OF A CONFLICT WITH ANY STANDARD SPECIFICATIONS.

C. AS A CONVENIENCE, THESE ADDITIONS, DELETIONS, AND AMENDMENTS HAVE BEEN ARRANGED IN A FORMAT THAT PARALLELS THE “STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION”, 2021 EDITION.

D. WHERE REFERNCE TO A SECTION DOES NOT CORRELATE WITH THE SUBJECT MATTER OF THE 2021 STANDARD SPECIFICATION, REFERENCE SHALL BE UPDATED TO REFFER TO THE

APPLICABLE PORTION OF THE PREVIOUS STANDARD SPECIFICATION

E. AS A CONVENIENCE TO THE CONTRACTOR, SUMMARY PAGES FOR THE FOLLOWING CONTRACT ITEMS HAVE BEEN PREPARED AT THE FRONT END OF THE TECHNICAL PROVISIONS:

1. SUMMARY OF PROJECT PLANS & RELATED BID SCHEDULE

2. SUMMARY OF PROJECT SCHEDULING AND LIQUIDATED DAMAGES

3. SUMMARY OF PROJECT MEASUREMENT AND PAYMENT CLAUSES

8.2. PROJECT PLAN AND REFFERENCE DOCUMENT SUMMARY:

The following describes the applicable plans for each bid schedule and their correlating project technical conditions.

Bid Schedule A: Jeronimo Road Widening Improvements
The following are the list of applicable plans for this bid schedule:

1. “Jeronimo Road Widening Improvement Project” prepared by TAIT & Associates.

2. “Traffic Signal Interconnect Plan (El Toro Road, Jeronimo Road, and Tr abuco Road)” Prepared by TJW Engineering Inc

3. “Traffic Signal Modification and signing and Striping Plan (Fire Station West of Jeronimo Road and El Toro Road)” Prepared by TJW Engineering Inc.

4. “Limited Geotechnical Investigation” dated December 23, 2020 Pre pared by Southern California Geotechnical (See Appendix B)

5. Forest Glenn Temporary Construction Easement and Agreement (See Appendix C) Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
172

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 70 Bid Schedule B: El Toro Median Improvements
The following are the list of applicable plans for this bid schedule:

1. “El Toro Road Median Improvement Project (From Jeronimo Road to Trabuco Road)” prepared by TAIT & Associates – EXCLUDE Sheets 5 & 6

2. “El Toro Road Pavement Evaluation and Repair Recommendations Report” dated June 30, 2022 by GMU Geotechnical (See appendix B)

Bid Schedule C: Trabuco Road Median Improvements
The following are the list of applicable plans for this bid schedule:

1. Sheets 5 & 6 only of “El Toro Road Median Improvement Project (From Jeronimo Road to Trabuco Road)” prepared by TAIT & Associates

3. “El Toro Road Pavement Evaluation and Repair Recommendations Report” dated June 30, 2022 by GMU Geotechnical (See appendix B)

8.3. PROJECT SCHEDULING REQUIREMENTS AND ADDITIONAL LIQUIDATED DAMAGES:

In addition to the baseline contract working days, additional scheduling restrictions and liquidated damages apply to this contract. The Contractor shall be required to comply with the following scheduling parameters during the course of construction:

Time is of the essence for the construction and completion of all roadway and traffic signal work associated with the Jeronimo Road Widening Project.

Scheduling Item Maximum Allowed Working Days
Bid Opening June 18, 2025
Award Construction Contract July 15, 2025
Equipment Procurement NTP August 1, 2025 [Does not start working Days] Issue Construction NTP [150 Working days] September 15, 2025

Jeronimo Road Widening– Forest Glenn Temporary Construction Easement Completion of construction activities on the Jeronimo Road Widening project shall be prioritized throughout the course of construction. A 6 month temporary construction easement has been procured for which all work associated with the Forest Glenn property must be completed within. TCE documents are included in Appendix C for the Contractor’s reference. TCE duration will be measured in calendar days and will initiate on the first day for which access is obtained or work is conducted on the Forest Glenn Property. Upon initiation of the TCE, additional working days for weather and other causes will not be allowed and all work must be completed within the 6 calendar month duration.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
173

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 71 NOTE - Due to the critical nature of the construction easement, additional Liquidated Damaged in the amount of $2,500 per calendar day will be assessed for each calendar day that the work extends beyond the above noted working days.

Jeronimo Road Widening– Southern California Gas Relocations It will be the contractor’s responsibility to coordinate and accommodate the required SCG facility relocations on Jeronimo Road. Contractor shall allow for 50 working days for SCG work to be completed. Prior to SCG mobilization, At a minimum the City’s Contractor shall complete the following items:
• Roadway Demolition and Rough Grading of Subgrade
• Potholing of subgrade soil within SCG vault limits to confirm no unknown conflicts exist • Construct retaining wall footings and initial course of the wall within vault limits • Prepare the subgrade within the limits of the proposed SCG facility

SCG will be responsible for the excavation of the pit, installation of all facilities, setting of the vault to the proposed sidewalk grades, and cleanup of stockpiles and debris generated from the installation of the facilities. City’s Contractor will be required to conduct final grading and the construction of curb and gutter and sidewalk to join the vault. City’s contractor shall work concurrently with the SCG contractor’s operations and no additional working days will be granted during the 50 working day period. SCG’s contractor shall have priority within the limits of the facility relocations upon initiation of the 50 working day window, however, City’s contractor may work on the Jeronimo Road project so long as traffic control and construction operations do not conflict with one another.

Jeronimo Road Widening– SMWD Air Vent Relocations
Contractor shall coordinate with SMWD on all related submittals and inspection requests during the course of construction. Prior to starting work on the air vent relocations, the following items shall be completed”

1. submit and obtain a SMWD encroachment permit ($320 fee) to perform the double vent extension work.

2. Submit shop drawings for 10 gauge min. CML&C welded steel vent piping fabricated per AWWA Standard C206 for SMWD review and acceptance a minimum of 45 days prior to fabrication.

3. Remove, protect and then reinstall the existing ornamental vent pole on the new sidewalk next to the relocated wall. Install vent piping in sand backfill per SMWD Standard Drawing W11.

4. Conduct digital camera recording from the vault interior to the new sidewalk vent end location and both of the recordings shall be provided to the SMWD Inspector.

IRWD Utility Cover Replacements
It shall be the contractor’s responsibility to coordinate with IRWD for all utility cover replacements and inspections. Contractor shall be responsible for obtaining and delivering water valve frame and cover to the site and returning salvaged frame and covers to the IRWD yard.

General Work Scheduling Requirements:

The following scheduling requirements shall apply to all project areas:

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
174

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 72 Storm Water Pollution & Prevention Plan (SWPPP):
• This project will disturb more than 1 Acr e of land in aggregate, and as a result, will require the implementation of a SWPPP. Contractor shall be required to prepare a project SWPPP for the entire project. SWPPP shall be prepared and submitted to the City within 14 days of the contract award.
• Upon approval of the SWPPP, Contractor shall promptly upload the SWPPP to the SMARTS system • Contractor shall be responsible for payment and scheduling of the permit fee

OCTA Bus Stop Coordination:
• Work on El Toro Road is anticipated to impact bus stop operations. Contractor shall coordinate with OCTA Stops and Zones Coordinator Kyle Poff, [email protected], at 714-560-5816 a minimum of 14 days prior to mobilizing on site.
• Contractor shall work with OCTA to relocate and accommodate bus stop traffic during the course of construction in order to phase work to minimize impact to the required bus operations.

Concrete Improvements:
• All concrete sidewalk and ramps removed shall be replaced and open to pedestrian traffic within 5 calendar days and, in no instance, shall the ramp or sidewalk remain demolished over a weekend. Should a ramp or sidewalk not be completed prior to a weekend the contractor shall be required to provide an accessible path of travel via temporary paving methods through the work areas over the weekend.

Roadway Patching:
• All roadway segments requiring localized removal and replacement shall be re-paved on the same day as demolition and excavation.

Roadway Mill & Overlay:
• Final Pavement Overlay shall be conducted no later than 5 working days after the initial pavement milling operations.

Roadway Reconstruction:
• All lanes of traffic shall be opened at the end of each working day • Vehicular traffic will not be allowed on CMB/Base sections. Base Paving will be require at the end of each day’s work prior to opening the roadway to traffic. • Ramping of the joins with temporary AC will be required at the end of each day to the City’s satisfaction. The Contractor shall maintain the temporary AC ramping within the job limits until the final AC/ARHM overlay is completed

Traffic Control & Phasing:

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
175

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 73 • At the start of the project, the Contractor shall submit a phasing plan to the City to outline the order of operations and approach for traffic control phasing. • Upon approval of the phasing plan, Contractor shall prepare detailed traffic control plans for all roadway segments.
• Roadway closures will not be allowed without prior authorization from the City.

8.4. SUMMARY OF MEASUREMENT AND PAYMENT CLAUSES (BID SCHEDULES A – C):

The following items of work pertain to the bid items included within this project:

NOTE: Contractor shall be required to track each bid item and bid schedule separately and provide appropriate backup documents for quantity verification purposes. Contractor shall assume appropriate administrative costs throughout the course of construction in order to track and present the appropriate backup documents. All such tracking costs are assumed to be included in other bid items and no additional compensation will be allowed.

The following items of work pertain to the bid items included within this project:

SECTION 1-9: CONTRACTUAL & REGULATORY BID ITEMS
Bid Item: Project Mobilization, Demobilization, and Cleanup (Not to Exceed 5% of Construction Costs)
Bid Item #s: A-1, B-1, C-1
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include all items listed in Section 00700, Article 40 of the general conditions, including but not limited to providing bonds, insurance and financing, establishing a field office, preparing a BMP Plan and construction schedule, obtaining necessary permits from the City and other governing jurisdictions, payment of applicable permit fees, and all other related work as required by the Contract Documents. The Contractor must remove all trash/debris, work trailer and appurtenances, and utility markings in the project area after the conclusion of work as part of this bid item. Compensation for this Bid Item shall at no time be greater than 5% of all Construction Costs, not including this Bid Item.

Bid Item: Construction Staking & Surveying:

Bid Item #s: A-2, B-2, C-2
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include establishing survey controls, verifying existing grades, coordination with City to verify any final grades or changes, conducting construction staking and setting the necessary field control, setting any final grades required by the City, and any Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
176

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 74 other construction survey or staking requirements as outlined in the technical provisions. This item does NOT include survey monument preservation and corner records which will be the responsibility of the City.

Bid Item: Traffic Control & Noticing:

Bid Item #s: A-3, B-3, C-3
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the traffic control related work, including the preparation and coordination of detailed traffic control plans, coordinating work phasing, as well as all work involving placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system as specified in the Standard Specifications and these specifications, and as directed by the City. The lump sum price shall also include non-skid steel plates and temporary AC including installation and removal; all associated temporary signing and striping; flashing arrow signs; PCMS’s; flagging and/or flagger costs and no additional compensation will be made therefor. Furthermore, this item shall also include all labor, material, and coordination required to prepare, obtain approval for, print, distribute, and coordinate public notices, including the required public coordination and scheduling of phasing and access operation of businesses, and no additional compensation will be allowed therefor.

Bid Item: SWPPP & Storm Water Protection:

Bid Item #s: A-4, B-4, C-4
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the tasks associated with the preparation and implementation of the SWPPP. Bid item includes preparation of SWPPP document, routing to the City for review and approval, upload and coordination of certification of the document with the City’s NPDES manager, paying of the permit fees, implementation of all construction BMPs, QSD/P field inspections, reports, and final cleanup/closeout of the permit.

SECTION 300 – DEMOLITION/EARTHWORK RELATED BID ITEMS
Bid Item: Sawcut, Remove & Dispose Ex. PCC Curb & Gutter, Sidewalk, and AC Roadway Paving for El Toro Rd Widening at Jeronimo Rd (Unclassified Excavation):

Bid Item #s: B-5
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) as measured in the field in plan view of all concrete and asphalt surface removed to facilitate complete construction of the minor widening effort on El Toro Road near Jeronimo Road, including excavation of all AC/PCC surfacing, PCC curb or curb and gutter, PCC sidewalk, and saw-cutting, removal and disposal of pavement base and subgrade materials to Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
177

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 75 the required depths as specified in the Standard Specifications and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefore

Bid Item: Sawcut, Excavate & Dispose of Ex. AC/PCC Roadway to required depth for Median Construction
Sawcut, Excavate & Dispose of Ex. AC/PCC Roadway, 2’ x 10” Min.

Bid Item #s: A-5, C-5
Measurement and payment for work under this item shall be at the contract unit price per Cubic Yard (CY) as field measured in plan view of the in place existing pavement surface area, and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including excavation of all surfacing, saw-cutting, removal and disposal of pavement, base, and subgrade materials to the required depths, as specified in the Standard Specifications and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefor.

Bid Item: Sawcut, Remove & Dispose of Ex. PCC Curb & Gutter

Bid Item #s: A-6
Measurement and payment for work under this item shall be at the contract unit price per Linear Foot (LF) as field measured in plan view and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including sawcutting and excavation of all surfacing, saw-cutting, removal, and disposal of all PCC items called out on plans to the required depths, to remove entire PCC item, as specified in the Standard Specifications and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefor.

Bid Item: Sawcut, Remove & Dispose of Ex. PCC Curb Ramp Bid Item #s: A-7
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) as defined as the full l limits of walkway and curb and gutter surface contained within the BCR/ECR of the noted intersection, and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including sawcutting and excavation of all surfacing, saw-cutting, removal, and disposal of all PCC items called out on plans to the required depths, to remove entire PCC item, as specified in the Standard Specifications and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefor. NOTE – this work item shall not be conducted until after the 2” or 4” grind is completed and limits of required removal and replacement are verified in the field.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
178

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 76 Bid Item: Sawcut, Remove & Dispose of Ex. PCC Sidewalk Bid Item #s: A-8
Measurement and payment for work under this item shall be at the contract unit price per Square Foot(SF) as field measured in plan view and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including sawcutting and excavation of all surfacing, saw-cutting, removal, and disposal of all PCC items called out on plans to the required depths, to remove entire PCC item, as specified in the Standard Specifications and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefor.

Bid Item: Remove & Dispose of Ex. CMU Retaining/Screen Wall, Pilasters, Associated Footings
Bid Item #s: A-9
Measurement and payment for work under this item shall be at the contract unit price per Cubic Yard (CY) as field measured in plan view and multiplied by the item’s section depth or end area of material in place (prior to excavation), and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including sawcutting and excavation of all surfacing, saw-cutting, removal of footings and rebar, and disposal of all CMU and associated materials, and to remove entire Retaining/Screen wall item, as specified in the Standard Specifications and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefor.

Bid Item: Remove & Dispose of Ex. Tree
Bid Item #s: A-10
Measurement and Payment for work under this item will be at the contract unit bid price per Each Item (EA), and shall include, but not be limited to grinding of the tree roots and stump below ground per the Greenbook requirements and the special provisions of these specifications, backfill of the resultant void with approved on site or Contractor provided backfill soil, and all other items required for the full removal of the existing tree and/or tree stump and no additional compensation will be allowed.

Bid Item: Grading & Earthwork:

Bid Item #s: A-12
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including all earthwork, export, and grading activities to reach the grades and slopes as shown on the project plans, and all other work items as required to complete the work in place, and no additional compensation will be allowed therefor. It shall be the contractor’s responsibility to do a final earthwork takeoff and base their bid on the total volume required for export and grading of the site regardless of final Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
179

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 77 figures. Quantities in the plans are for bonding purposes only and shall not be used as the sole basis for the Contractor’s bid.

Bid Item: Additional Sawcut & Roadway Section Removal Within Median Planting Area Bid Item #s: B-27
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) as measured in the field inn the plan view and shall be limited to the total footprint of the proposed planted areas of the islands only. Bid item includes all labor, equipment, materials, and incidentals required to complete all sawcut, excavation removal and disposal of pavement base and subgrade materials to the required depths as specified in the Standard Specifications and the planting plans and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefore

SECTION 301 – SUBGRADE AND BASE MATERIAL RELATED BID ITEMS Bid Item: Construct 10" CMB:

Bid Item #s: A-16, B-20,
Measurement and payment for work under this item shall be at the contract unit price per TON, as measured from the delivered material tickets for material actually installed only, and shall include all labor, materials, equipment, and incidentals for subgrade preparation, grading, and compaction, installation of base material, compaction, protection of work, and all other work associated with this task, complete and in place. It shall be noted that all CMB used for ramping, backfill of non-applicable work items, or spoils/remainder of material left at the end of the day shall not be included as part of this bid item. CMB placed under sidewalk, ramps, etc. are also excluded from this work item and shall be deducted from the tonneage delivered to the site.

Bid Item: Backfill, Grade, and Compact Median Infill Area with Crushed Roadway Spoils & CMB Import (+/- 4” Thick):

Bid Item #s: B-26
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include all work associated with placing, crushing, backfilling, grading and compacting the Median Infill areas and all other work items as required to complete the work in place. Furthermore, this item shall include all labor, materials, equipment, and incidentals required for crushing of ex. AC/PCC spoil materials, importing and placing CMB (as needed and at the contractor’s option), grading, compacting materials for cobblestone infill base preparation, and protection of the work, and all other work associated with this task, complete and in place. All spoils used for backfill shall be crushed to the equivalent gradation and specification of CMB per the standard specifications This work item shall include all surface preparation as well as labor, materials and work required to fully complete the noted item of work.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
180

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 78 SECTION 302 – ROADWAY SURFACING RELATED BID ITEMS
Bid Item: 2" Uniform Depth AC Cold Mill:
4” Uniform Depth AC Cold Mill:
1-1/2” to 2-1/2” Variable Depth AC Cold Mill:

Bid Item #s: A-18, A-19, B-6, C-6
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include uniform depth cold milling of the asphalt roadway to the depth as identified on the plans and all other work items as required to complete the work in place. All costs associated with temporary AC ramping and joins shall be included in other bid items and no additional compensation will be allowed.

Bid Item: Construct 3.5:” AC Pavement Section
Construct 1-1/2" AC Leveling Couse:

Construct Full Depth AC Slot Pavement Patch Back
Construct 4.5" AC Pavement Base Course
Install Variable Depth AC Leveling Course, 2.5" Max

Bid Item #s: A-17, B-7, B-18, B-19, C-7, C-10, C-11
Measurement and payment for work under this item shall be at the contract unit price per TON, as measured from the delivered material tickets for material actually installed, and shall include all labor, materials, equipment, and incidentals required for base preparation (including scarification and compaction of subgrade or base material), installation of Tack coat, construction of the AC pavement surface, compaction and protection of work, and all other work associated with this task, complete and in place. The Contractor shall furnish to the Engineer at the time of delivery of the material on the job site a legible copy of a licensed weighmaster's certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture. Material that is delivered but not placed within the allotted bid item will not be measured or paid for. This work item shall include all surface preparation and weed abatement as well as labor, materials and work required to fully complete the noted item of work. Payment for slot pavement adjacent to curb and gutter not specifically differentiated in bid schedules shall be considered included in the noted concrete bid items and no additional payment will be allowed.

Bid Item: Construct 2-1/2" ARHM Overlay:

Construct 2” ARHM Overlay
Bid Item #s: A-20, B-8, C-8
Measurement and payment for work under this item shall be at the contract unit price per TON, as measured from the delivered material tickets for material actually installed, and shall include all labor, materials, equipment, and incidentals required and shall include full compensation for conducting crack sealing, crack filling, and weed abatement on the cold milled surface, all surface preparation and tack coat, and incidentals and for doing all the work Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
181

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 79 involved, including furnishing, applying and cleaning up excess rock dust blotter. Temporary surface work where required by the Owner's Representative for traffic control or other purposes shall be considered included in the price bid for Traffic Control and no additional compensation will be allowed.

Bid Item: Local Digouts - 4" Thick (Sta. 104+00 to Jeronimo) Local Digouts - 12.5" Thick (Jeronimo Rd to Toledo Way ) Local Digouts - 14" Thick (Toledo Way to Trabruco Rd)
Bid Item #s: B-9, B-10, B-11
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include all work associated with identifying and marking the limits of the localized pavement removals, sawcutting and removal of the asphalt roadway to the depth as identified on the plans and all other work items as required to complete the work in place.

The contractor will be responsible for the removal and disposal of any petromat material and foreign materials encountered during sawcut an removal operations. Furthermore, this item shall include all labor, materials, equipment, and incidentals required for base preparation, installation of Tack coat, construction of the AC base paving course, compaction and protection of work, and all other work associated with this task, complete and in place. The Contractor shall furnish to the Engineer at the time of delivery of the material on the job site a legible copy of a licensed weighmaster's certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture. Material that is delivered but not placed within the allotted bid item will not be measured or paid for. This work item shall include all surface preparation as well as labor, materials and work required to fully complete the noted item of work. This bid item shall be completed AFTER the full width grinding and ahead of the pavement overlay in order to allow for a final inspection of the pavement surface and adjustment of patching areas prior to implementation.

Bid Item: Remove & Reconstruct Private AC Pavement, in Kind Bid Item #s: B-24
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include sawcutting and removal of the asphalt roadway to the depth noted on the plans and all other work items as required to complete the work in place. The contractor will be responsible for the removal and disposal of any petromat material and foreign materials encountered during sawcut an removal operations. Furthermore, this item shall include all labor, materials, equipment, and incidentals required for base preparation, installation of Tack coat, construction of the AC paving course (base and surface), compaction and protection of work, and all other work associated with this task, complete and in place. The Contractor shall furnish to the Engineer at the time of delivery of the material on the job site a legible copy of a licensed weighmaster's certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture. Material that is delivered but not placed within the allotted bid item will not be measured or paid for. This work item shall include all surface preparation as well as labor, materials and work required to fully complete the noted item of work.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
182

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 80 Bid Item: Added Cost for Disposing Pavement Fabric (Estimated from Corings) Bid Item #s: B-12
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include all additional work associated with removing and disposing of pavement fabric which is discovered within the pavement grinding or patching lmiits. Total area shall be measured in the field and verified by the inspector at the time of discovery.

SECTION 303 – CONCRETE AND MASONRY CONST. RELATED BID ITEMS Bid Item: Remove & Reconstruct 4" PCC Sidewalk, Prune & Remove Conflicting Roots, Coordinate with City Arborist
Construct ADA Accessible 4" PCC Sidewalk:

Bid Item #s: A-15, B-13
Measurement & Payment for work under this item shall be at the contract unit price per Square Foot (SF) basis as measured in the field in plan view and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including removal and disposal of existing improvements and materials, construction of new sidewalk including coordinating with the City Inspector to verify locations and limits, removals, preparation of subgrade, import and compaction of 4” CMB for any new sidewalk (jeronimo), construction of work item, adjustment of miscellaneous parkway items found within the limits of construction, finishing and protection of the work item and no further compensation will be allowed therefore. Measurement of this bid item shall not include the area of any planter areas, and shall only include the actual PCC surface area as measured in the plan view. This item shall only apply in areas that are specifically identified on the plans with a separate construction note. All sidewalk that is adjacent to/associated with curb ramps or driveways that are not specifically identified as a sidewalk construction item shall be considered paid for as part of the separate bid item and no additional compensation will be allowed.

Bid Item: Sawcut & Remove ex. AC Roadway Section and Construct 8" PCC Median Curb, Type A1-8
Construct 8” PCC Median Curb (A1-8)
Construct 8” PCC Curb & Gutter (A2-8)
Construct 12-18” Wide Monolithic Median Curb
Remove & Reconstruct Private Curb & Gutter
Bid Item #s: A-13, B-15, B-23, B-25, C-9, C-12
Measurement and payment for work under this item shall be at the contract unit price per Linear Foot (LF) and shall include Verifying limits of improvements with City, sawcutting, removing and disposing of the existing curb or curb & gutter and slot pave area within the curb or curb & gutter limits, sub grade compaction, verifying proposed grades and positive drainage, constructing the curb or curb & gutter to match existing gutter width, installing required roadway base and Base AC paving for the slot pave area, protection of the improvements, and all other items as required to complete the work in place. It shall be the contractor’s responsibility to verify field grades and ensure positive drainage is obtained between the two points of removal and replacement.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
183

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 81 Bid Item: Remove Existing and Construct New ADA Compliant PCC Accessible Curb Ramp:

Bid Item #s: A-14, B-14
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) as defined as the full limits of removal and construction to complete an ADA compliant curb ramp, curb and gutter, and any adjoining sidewalk required for ADA compliance, and shall include furnishing labor, materials, equipment, and disposal to complete the construction, including the removal of existing improvements, curb and gutter, and sidewalk, construction of the curb and gutter, construction of the curb ramp and adjoining sidewalk leading to the ramp, installation of truncated dome system, paving of the 2-4 foot wide slot pave adjacent to the proposed concrete improvement in order to achieve the required landing distances, protection, modification, and repair of any adjacent private irrigation system affected by the work, and all other items as required to complete the work in place. Adjustment of pull boxes and utilities located within the ramp are included in this bid item as well as the dry packing and forming of curbs around signal poles and footings (where required). The limits of the curb ramp shall be defined as all ramp, sidewalk, retaining curb, and all other items required to construct the curb ramp per standard plan or plan detail and shall be bound by the BCR/ECR of each intersection. Contractor shall review the plans and the site carefully to understand existing site constraints and limits of work at each ramp. The City reserves the right to make field adjustments at each ramp prior to saw cutting, forming, and pouring of the ramp in order to ensure a compliant ramp is constructed at no additional cost. NOTE –Contractor will be responsible for setting field grades on ramps that do not have elevations provided. Hours associated with verifying and setting sawcut limits in the field shall be included in this work item.

Bid Item: Sawcut, Remove Ex. Curb and/or Curb & Gutter, AC/PCC Roadway & Construct New PCC Bus Pad & Monolithic Curb & Gutter:

Bid Item #s:B-16
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF), as measured in plan view and includes from back of curb to the edge of the concrete surface and shall include all labor, materials, equipment, and incidentals required for the construction of the bus pad per the project plans and standards including sawcut, demolition, removal and disposal, subgrade preparation, forming, reinforcement, placing of concrete, construction of monolithic curb, and protection of work during the curing period.

Bid Item: Fill Sidewalk with PCC, Flush with Ex. Surface Bid Item #s: B-17
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) location as shown on the plans and is defined as the cleaning and filling of an existing PCC sidewalk pothole, flush with adjacent surfaces, with 520-C-2500 PCC per the latest Greenbook Standards, and shall include furnishing labor, materials, equipment, and disposal to Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
184

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 82 complete the construction, and all other items as required to complete the work in place and no further compensation will be allowed.

Bid Item: Remove & Reconstruct PCC Driveway, 10% Max:

Bid Item #s: B-22
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include Verifying limits of improvements with City, sawcutting, removing and disposing of the existing driveway and slot pave area within the driveway limits, sub grade compaction, verifying proposed grades and positive drainage, constructing the driveway to match existing driveway width, installing required roadway base and Base AC paving, protection of the improvements, and all other items as required to complete the work in place.

Bid Item: Install Median Cobble Paving
Bid Item #s: B-31
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include all work associated with constructing a grouted cobblestone median infill as identified on the plans and specified in the Technical Specifications, and all other work items as required to complete the work in place. Furthermore, this item shall include all labor, materials, equipment, and incidentals required for infilling the median area with grouted cobblestone, and protection of work, and all other work associated with this task, complete and in place. This work item shall include all surface preparation as well as labor, materials and work required to fully complete the noted item of work.

Bid Item: Construct CMU Retaining/Screen Wall:

Bid Item #s: A-28
Measurement and payment for work under this item shall be at the contract unit price per Linear Foot (LF) and shall include all labor, equipment, materials, and incidentals associated with the construction of the proposed retaining wall including all free draining backfill material required behind the wall as identified in the geotechnical report, construction of footings, construction of wall, water proofing and sudraing/weep holes, backfill and compaction of the material, protection and phasing of the wall during construction, and coordination and matching of the proposed bricks to the existing wall per City satisfaction to match existing condition, and all other work items as required to complete the work in place.

Bid Item: Construct CMU Wall Pilaster:

Construct CMU Wall Monument Pilaster

Bid Item #s: A-29, A-30
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
185

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 83 Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include all labor, equipment, materials, and incidentals associated with the construction of the noted wall pilasters and extension of footings including construction of footings, construction of wall, water proofing and sudraing/weep holes, backfill and compaction of the material, protection and phasing of the wall during construction, and coordination and matching of the proposed bricks to the existing wall per City satisfaction to match existing condition, and all other work items as required to complete the work in place.

Bid Item: Replace “Forest Glen” Monument Sign, in Like Condition:

Bid Item #s: A-33
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include the cost for removing and replacing the ecxisting Forest Glen Monument sign in kind and attaching to the newly constructed retaining wall.

SECTION 304 – METAL FABRICATION AND CONSTRUCTION RELATED BID ITEMS Bid Item: Remove & Reconstruct/Reconfigure Steel Security Fencing & Gate. Material, Color & Finish to Match Existing
Bid Item #s: A-31
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including sawcutting and excavation of all footings, cutting, removal, and disposal of all Steel Fencing called out on plans to the required lengths, to remove the Fencing in conflict with the proposed improvements, construction of new fencing and required footings, joining of the new fence to the existing fence, and painting/finishing of the fence to match original conditions and all other items required to complete the item in place.

SECTION 314 – SIGNING & STRIPING RELATED BID ITEMS
Bid Item: Implement Signing & Striping Plans:

Bid Item #s: A-35, B-39, C-14
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in preparing an existing condition removing existing striping and rpms/signs, placing temporary striping (as needed), permanent striping, legend markings, arrows, raised pavement markers (including fire hydrant markers), traffic signs and posts as shown on the striping plans, restriping of all existing red curbs within the project limits and all other items as required to complete the work in place.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
186

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 84 SECTION 402 – UTILITIES (RELOCATIONS)
Bid Item: Coordinate SCG Vault Relocation & Prep Work :

Bid Item #s: A-21
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include all labor associated with the coordination and preparation of the work area for the SCG vault relocation/. This task includes potholing of the proposed vault locations to the depth of subgrade to confirm no unforeseen utilities or conflicts are in place prior to SCGs mobilization.

Bid Item: Relocate IRWD Fire Hydrant Assembly
Bid Item #s: A-24
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) as field measured in plan view, of the proposed Fire Hydrant Assembly item(s) to be removed and relocated, and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including sawcutting and excavation of all surfacing, saw-cutting, removal, and disposal of all unusable piping as specified in the Standard Specifications, installation of new piping to extend to the ultimate location of the hydrant per IRWD standards, installation fo the fire hydrant per IRWD standards, and testing fo the installed hydrant per IRWD standards. This task includes all trenching, backfill, and pavement sections within the utility trench and all other required items to complete these items in place.

Bid Item: Relocate Ex. SMWD Air Vac Ornamental Pole:

Bid Item #s: A-23
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including sawcutting and excavation of all surfacing, saw-cutting, removal, and disposal of all removed PCC pipe encasement, and cutting of existing air vac intake and exhaust piping, and salvaging Air Vac Ornamental Pole, remaining air piping, and Mounting Appurtenances, conducting final CCTV inspection and verification per SMWD requirements, and completeting of work as specified in the Standard Specifications and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefor.

403 - UILITY ADJUSTMENT RELATED BID ITEMS
Bid Item: Remove & Install New Domestic or Reclaimed Water Valve Frame and Cover to Grade (IRWD Facility):

Bid Item #s: A-25, B-34
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
187

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 85 Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include all related asphalt concrete and PCC work, Coordination with IRWD, traffic control, and protection of the work during PCC curing and all incidentals to accomplish the work as specified herein. New frame and covers for the water vales will be provided by IRWD. Contractor shall assume all necessary hours for coordination, pickup, and delivery of materials to the project site. No work shall be authorized for utility adjustments prior to IRWD notification and inspection. Lowering of valves prior to paving/construction activities shall be included in other bid items and no additional compensation will be allowed.

Bid Item: Adjust Ex. SMWD Manhole Frame & Cover to Grade Adjust Ex. Water Valve Frame & Cover to Grade
Bid Item #s: A-22, A-27
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include all related asphalt and PCC work, Coordination with utility purveyors and traffic control, and protection of the work during PCC curing and all incidentals to accomplish the work as specified herein, and no additional compensation will be allowed therefor. No work shall be authorized for utility adjustments prior to City and utility notification and inspection. This bid item shall include payment for the final adjustment of the utility to grade only.

Bid Item: Adjust Cathodic Protection Test Station to Grade:

Bid Item #s: A-26
Measurement and Payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include adjusting, lowering and raising prior to paving operations including adjustment and blocking of box and frame to grade, curing of concrete, and paving of final surface around frame, and including all other work items as required to complete the work in place. Box frames and covers within the area to be paved, poured or graded shall be set to finish grade and to meet current ADA or standard Specification requirements by the Contractor as required by the plans and specifications. New pull boxes and covers shall be provided by contractor if damaged, or requiring adjustment. All appurtenant work shall be as included in the unit prices for this work and no additional compensation will be allowed.

SECTION 701 – STREET LIGHTING & TRAFFIC SIGNAL RELATED BID ITEMS Bid Item: Remove & Relocate Ex. Pedestrian Traffic Push Button to 3'-6" above Grade:

Bid Item #s: B-21
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include removal of existing pedestrian push button and re-installation of pedestrian push button to 3’-6” height above proposed grade per relevant Sections of the American with Disabilities Act (ADA), latest edition, including wiring, mounting, testing, covering any remaining old installation holes with like materials, and all incidentals to accomplish the work as specified herein, and no additional compensation will be allowed therefor.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
188

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 86 Bid Item: El Toro & Toledo Video Detection Signal Upgrade:

El Toro & Serrano Video Detection Signal Upgrade:

El Toro & Trabuco Video Detection Signal Upgrade:

Bid Item #s: B-35, B-36, B-37
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include removal upgrading existing electronics and controls to revise the existing Traffic Light Detection System to Video based., including all wiring, conduits, cabinet work, , and all incidentals to accomplish the work as specified herein, and no additional compensation will be allowed therefor.

Bid Item: Remove & Replace Traffic Loop Detector:

Bid Item #s: B-38, C-13
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) basis and shall include all materials, labor, and equipment necessary to perform all operations to verify the existing location, configuration, and connection of the traffic loops, remove and dispose of existing conductors, install traffic loops to match existing conditions, connect and test the traffic loops, and ensure full replacement and activation of the traffic loops through the project site during construction, in the areas shown on the Plans, and as directed by the Engineer. Replacement loops shall be as specified in Caltrans Standard Specifications Section 86-5.01A, and as stated herein. Contractor shall coordinate with the Engineer for final placement of loops. Any traffic loops that are damaged during construction, outside the areas shown on the exhibits or shown as protect in-place shall be fully replaced at the Contractors expense and to the satisfaction of the Engineer. No further compensation will be allowed therefor.

Bid Item: Remove and Relocate Ex. Signage:

Bid Item #s: A-11
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include removal and relocation of existing street sign identified on the street improvement plan including pole installation, mounting, and all incidentals to accomplish the work as specified herein, and no additional compensation will be allowed therefor. This bid item does NOT include installation of new or relocated signs identified in the signing and striping plans which are considered to be part of the signing and striping bid item.

Bid Item: Traffic Signal Modifications:

Bid Item #s: A-34
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include all traffic signal modifications, poles, footings, conduit, signals, signs, and improvmeents noted on the associated traffic signal mofidicaitions plans for Jeronimo Road Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
189

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 87 and El Toro Road. This bid item also includes all associated traffic loop detectors included at this intersection which are denoted on the signal modification plans. Contractor shall be required to pothole and verify existing utilities near and adjacent to the proposed signal poles prior to ordering materials. Potholing shall be conducted immediately upon issuance of NTP in order to allow maximum amount of time for any

Bid Item: Traffic Signal Interconnect Improvements:

Bid Item #s: A-36
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include all work depicted on the traffic signal interconnect plans as well as the singal and service point installation improvements identified at the Fire Station near the Jeronimo Road and El Toro Road intersection. This task includes potholing of the proposed conduit locations prior to start of construction to verify utility crossings, surface repair of all pothole locations, installation fo proposed conduit and conductors, connection and testing fo the system, all traffic singal improvements, service point and utility coordination, surface repair (AC, PCC, an dPlanting) of the proposed conduit path, and full implemjentation of all improvements identified in the signal interconnect and traffic signal modification plans.

SECTION 801 – LANDSCAPING BID ITEMS
Bid Item: Forest Glenn Hillside Stabilization and Temporary Planting:

Bid Item #s: A-32
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include all labor, equipment, material, and incidentals associated with the final stabilization, temporary planting (and irrigation), and closeout of the proposed fill slopes associated with the Forest Glen community. Final planting will be selected and installed by the property owner, however, temporary planting shall be selected and coordinated for approval and installation by the City’s contractor. All slope stabilization shall be conducted per CASQA standards in order to allow the permanent closure and filing of NOT for the SWPPP. All grading, material, irrigation, and planting associated with the stabilization shall be included in this task and must be complete prior to expiration of the 6 month temporary construction easement.

Bid Item: Trench & Extend Water & Low Voltage to Median:

Bid Item #s: B-28
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include all trenching, conduit, conductor, and surface repairs associated with the connecton of the proposed irrigation system to the existing City irrigation main and controller and extending of the service to the edge of the proposed landscaped median and no additional compensation will be allowed.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
190

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 88 Bid Item: Trench & Install Irrigation & Low Voltage Sleeves Across Intersections:

Bid Item #s: A-29
Measurement and payment for work under this item shall be at the contract unit price per Linear Foot (LF) and shall include all trenching, conduit, conductor, and surface repairs associated with extending the proposed irrigation system between proposed medians at intersections and no additional compensation will be allowed.

Bid Item: Import soil for Planting Area:

Bid Item #s: B-30
Measurement and payment for work under this item shall be at the contract unit price per Cubic Yard (CY) and shall include import of approve dsoil planting material within the planter areas per the landscape plans and specifications, including all labor, material, equipemnt, and incidentals and no additional compensation will be allowed.

Bid Item: Install Irrigation System:

Bid Item #s: B-32
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include installation of the irrigation system per contract plans and specifications within the median islands including all conduit, wiring, base, boxes, valves, irrigation heads and all required material as well as testing and verification of the system including all labor, material, equipemnt, and incidentals and no additional compensation will be allowed.

Bid Item: Landscape Grading & Planting:

Bid Item #s: B-33
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include installation of all palnting material identified on the planting plans and specifications as well as soild/ground cover material associated with the planting plan to be complete in place including all labor, material, equipemnt, and incidentals and no additional compensation will be allowed.

Bid Item: 90 day Landscape Establishment Period:

Bid Item #s: B-40
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include all plant maintenance, upkeep, replacement of damaged or dead plants, replacement of broken heads, and coordination with the City for final sign off at the end of the 90 day period. Work associated with the establishment period will not count Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
191

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 89 towards the total working days on the contract and may extend beyond the final construction completion date without incurring liquidated damages.

8.5. PART 2 - CONSTRUCTION MATERIALS
SECTION 200 – ROCK MATERIAL
200-2 UNTREATED BASE MATERIAL
200-2.1 General. ADD the following:

Untreated base shall be Crushed Miscellaneous Base conforming to the requirements of Subsection 200-2.4.

SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS
REVISE as follows:

201-1 PORTLAND CEMENT CONCRETE
201-1.1.2 Concrete Specified by Class and Alternate Class. ADD the following to Table 201-1.1.2:

REVISE the following in Table 201-1.1.2:

Curb and Gutter and Sidewalk 520-C-3250

Concrete for Utility Adjustments 660-C-3750

201-1.2 Materials.
201-1.2.1 Portland Cement. ADD the following:

All cement to be used or furnished on this Project shall be Type V Portland Cement conforming to ASTM C150.

201-1.2.4 Chemical Admixtures. DELETE Subsection in its entirety and replace with the following:

No admixtures will be allowed unless approved in advance by the Engineer.

201-1.2.6 Reclaimed Concrete Material. DELETE Subsection in its entirety and replace with the following:

No reclaimed concrete material will be allowed.

201-1.4 Mixing.
201-1.4.1 General. ADD the following to the end of the section:

Mixed concrete delivered to the site shall be by Transit Mixer as called for in Section 201-1.4.3 “Transit Mixer” of the Standard Specifications.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
192

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 90 SECTION 203 - BITUMINOUS MATERIALS

203-3 EMULSIFIED ASPHALT
203-3.1 General. Add the following:

Tack Coat shall be SS-1h type.

203-6 ASPHALT CONCRETE
203-6.1 General. Add the following:

Asphalt Concrete Paving on Civic Center Drive shall be:
• Base Course Paving: Type III-B2-PG 64-10
• Surface Course, Cap, or Overlay (Top 0.1-ft AC lift): Type III-C3-PG 64-10

203-11 ASPHALT RUBBER HOT MIX (ARHM)
203-11.2 General. ADD the following:

Surface course paving shall be ½” maximum aggregate Type ARHM-GG-C per Section 203-11.3 of the Standard Specifications

8.6. PART 3 - CONSTRUCTION METHODS
SECTION 300 - EARTHWORK
Add the following:

The Contractor shall perform testing in connection with earthwork. Tests shall be made to conform with Section 211, "Material Tests," and the following:

Test

Test Method

Relative Compaction ASTM D1557
Sand Equivalent ASTM D2419
Resistance (R-Value) ASTM D2844 or Caltrans Method 301
Sieve Analysis
Shear Strength
ASTM D6913
ASTM D3080
Nuclear Density Gauge ASTM 2922/3017
Sand Cone ASTM D1556
Driven Cylinder ASTM D2937
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
193

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 91 Expansion Index
Atterberg Limits
UBC Std. 18-2
ASTM D4318
Soluble Sulfate Content ASTM D516 or Cal Method 417B

The location and frequency of field density tests will be determined by the Geotechnical Consultant. The results of these tests and compliance with the specifications will be the basis upon which satisfactory completion of work will be judged by the on-site Geotechnical Consultant.

Trenches, holes, depressions and pits caused by the removal of facilities shall be backfilled with embankment material as provided in Section 300, "Earthwork," of the Standard Specifications. Such trenches, holes, depressions and pits that are in surfaced areas, otherwise to remain undisturbed, shall be backfilled with material equal to or better in quality and to the same thickness as the surrounding materials.

When hauling is done over public highways, and when directed by the Engineer, loads shall be trimmed and all material removed from shelf area of vehicles in order to eliminate spilling of material. If directed by the Engineer, loads shall be watered after trimming to eliminate dust.

Operations shall be conducted in such a manner that existing highway facilities, utilities, and other upon-highway facilities which are to remain in place will not be damaged.

No additional compensation shall be allowed for conformance to this requirement.

300-1 CLEARING AND GRUBBING.
300-1.1 General. ADD the following:

Clearing and grubbing shall include but not be limited to the following:

A. Demolition and removal of existing turf, existing shrubs, trees and groundcovers at the median islands and elsewhere as needed to complete the construction as indicated on the Plans. Scrape off turf at finished grade and dispose of offsite. All items noted for removal shall become the property of the Contractor unless otherwise noted.

2. All items to be removed shall be verified by the inspector prior to demolition. The contractor shall meet with the inspector prior to clearing and grubbing.

3. All items to be removed shall be marked by the contractor prior to inspection and removal.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
194

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 92 4. The Contractor shall exercise extreme caution while excavating due to underground utilities.

Call dig alert for verification before digging. Work may require alternate less efficient means and methods in order to protect utilities.

5. The Contractor shall protect in place all trees and shrubs, unless indicated otherwise. Contractor shall repair turf, curbs, signs, shrubs, or trees damaged due to contractors operations.

6. All demolition, unless shown as salvaged and construction debris shall be removed from the site and delivered to a legal recycler dump site. Contractor to provide receipts for dumping or recycling sites fees.

7. Dust shall be controlled by watering.

300-1.1.2 Prune/Remove Existing Roots ADD in its entirety:

All roots shall be cut clean with a mechanical root cutting machine designed for such purposes, a sharp saw / or hand pruners. Trenching machines, backhoes, and axes are not allowed in root pruning operations. Trenching around existing trees and roots shall be done by hand without the use of power tools unless specifically directed by the City.

No more than ¼ the tree’s root system shall be removed without permission from the City Arborist.

Root pruning on the surface roots shall only occur if the surrounding surface cannot be raised and with the approval of the City. No root pruning shall occur within 5’ of the root ball crown without the approval of the City.

300-1.1.3 Tree Protection ADD in its entirety

The Contractor shall not store materials, or operate heavy equipment, or vehicles within (10) feet of trunks of existing trees to remain. The Contractor shall not operate heavy equipment within ten (10) feet of trunks of existing trees.

300-1.3 Removal and Disposal of Materials
300-1.3.1 General. After the last paragraph, ADD the following text:

All soils and materials are subject to testing by the City.

300-1.3.2 Requirements. after paragraph a), ADD the following text:

Contractor shall scan the work area using a metal detector of adequate strength prior to any saw cutting, excavation or cold planing of the existing pavement. Contractor shall be responsible for locating and protecting manhole, water valve, utility access frames and covers or other metal appurtenances buried below the existing pavement surface whether shown on the plans or not.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
195

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 93 All existing asphalt concrete pavement that is to be joined by new construction shall be sawcut in a straight line. The Contractor shall not disturb or damage existing improvements to be protected in place.

Any damage done by Contractor and/or its equipment shall be repaired or replaced at Contractor's expense. The Contractor shall call Underground Service Alert of Southern California [USA] at 811 prior to excavation and shall "pothole" existing utilities as necessary or as required by Utility Owner to determine their depth to avoid damaging said utilities.

AC pavement shall be saw cut to full depth around entire join perimeter. Removal of existing pavement sections shall be to the depth required for construction of the replacement roadway sections as shown on the plans and will include the removal of existing AC pavement, cement treated base and/or aggregate base. All removed material becomes the property of the Contractor and shall be hauled away and legally disposed of properly outside of the roadway right of way.

Contractor shall remove slurry/asphalt concrete buildup on the existing gutter lip to the satisfaction of the owner's representative.

No crushing operations by Contractor will be allowed at the job site or within the City limits. Contractor shall price the unclassified excavation and other related bid items accordingly.

after paragraph c), ADD the following text:

In addition to previously noted items, the following items of work are included in the site removals, clearing, and grubbing:

• All items requiring removal which are not specifically identified in another bid item

• Removal of excess spoil from AC milling, excavation, disposal of debris, shrubs, rubbish and excess material away from site and disposal and payment of all required fees at a licensed disposal site.

• Maintaining dust control at all times by watering.

• Removal and disposal of any additional items not specifically mentioned herein, which may be found within the work limits or are shown on the plans to be removed.

• Removal and disposal of unnamed concrete improvements.

• Restoration and clean-up of the site.

• Providing for traffic control and maintenance of access, security and safety including signs, barricades, flashers, covers, plates and chain link fencing as specified elsewhere in these specifications.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
196

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 94 • Protecting in place of existing improvements and utilities.

• Providing all necessary means to avoid tracking of asphaltic material on existing or new asphalt pavement during paving operations including landscaped and hardscaped facilities.

• Removing and relocating all sprinkler lines, heads, valves, etc. interfering with construction of improvements where new sidewalk is constructed (not including those called out to be removed in the media).

Removal and replacement of curb or curb and gutter shall be minimum 8 feet in length and shall span beyond any existing crack or to any joint within 8 feet of the minimum length span. If joins between existing and replaced spans are made with a dowel epoxied in place or with an epoxy joint, then the existing adjacent minimum length to crack or joint may be reduced to 3 feet.

All materials removed will be lawfully disposed of at a site secured by the Contractor. The Contractor will make every effort to recycle excavated and demolition materials. The Contractor will provide the Engineer with a letter indicating the final disposition of all excavated and demolition materials from the project within five (5) working days after project completion.

No excavated or demolition materials will be left in the public right of way overnight without AGENCY approval.

All existing improvements to be joined shall be cut in a clean straight line along the join line by use of a concrete cutting saw. Compensation for this requirement shall be considered as included in the price bid in the proposal form and no additional compensation will be allowed therefor.

Sawcutting shall consist of cutting existing Portland cement concrete and Asphalt Concrete to facilitate its removal. Cutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. Under this item, the use of a grinder will not be allowed in lieu of power-driven saw. Residue from sawcutting shall be vacuumed up while sawcutting.

300-2 UNCLASSIFIED EXCAVATION.
300-2.1 General. Unclassified excavation shall consist of all excavation, including roadways, unless separately designated.
300-2.2 Unsuitable Material.
300-2.2.1 General. Material that is unsuitable for its planned use shall be excavated and disposed of as directed by the Engineer.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
197

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 95 The removal and disposal of unsuitable material will be paid for at the Contract Unit Price for unclassified excavation if the removal of such material is shown on the Plans or specified in the Special Provisions.

If the removal of unsuitable material is n ot shown on the Plans or specified in the Special Provisions, the removal and disposal of such material will be paid for at the Contract Unit Price for unclassified excavation. However, if the removal and disposal of such material involves a substantial change in the character of the work, an adjustment in payment will be made per 3 -

2.4. 300-2.2.2 Wet Material. If required excavated material is unsatisfactory for the specified use on the Work solely because of high moisture content, the Contractor may be directed by the Engineer to either process the material to reduce the moisture content to an optimum condition, or to remove the material and replace it with suitable material. If such high moisture content is not the result of any action on the part of the Contractor, or inaction in protecting the work during the course of the Contract, the work involved will be paid for in accordance with 3-2 or 3-

3. Otherwise, the Contractor shall submit to the Engineer for approval, a plan for drying or removing and replacing the wet material, and such work and material shall be at the expense of the Contractor.
300-2.3 Overshooting. Excessive blasting will not be permitted. Material outside the authorized cross section which may be shattered or loosened because of blasting shall be removed at the Contractor;s expense. The Contractor shall discontinue any method of blasting which leads to overshooting, is hazardous to the public, or is destructive to property or natural features.
300-2.4 Slides and Slipouts. Material outside the planned excavation limits which is unstable and constitutes a potential slide as determined by the Engineer, material which has come into the planned excavation limits, and material which has slipped out of new or old fills shall be excavated to designated lines or slopes either by benching or in such manner as directed by the Engineer. Such material may be used in the construction of an unclassified fill or disposed of as directed by the Engineer.

The removal and disposal of slide and slipout material as above specified, not resulting from overshooting as specified in 300 -2.3 and not resulting from any act or failure to act on the part of the Contractor, will be paid for at the Contract Unit Price for unclassified excavation for the quantities involved.

However, if due to the character of the work, the removal and disposal of such material is not properly compensable at the Contract Unit Prices for unclassified excavation, the work may be paid for as provided in 3-2 or 3-3.
300-2.5 Slopes. Excavation slopes shall be finished in conformance with the lines and grades shown on the Plans. All debris and loose material shall be removed. When completed, the average plane of the slopes shall conform to the slopes indicated on the Plans and no point on the completed slopes shall vary from the designated plane by more than 6 inches (150 mm) Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
198

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 96 measured at right angles to the slope. Where excavation is in rock, no point shall vary more than 2 feet (600 mm) from the designated plane of the slope. In no case shall any portion of the slope encroach so as to interfere with the planned use of the facility.

The tops of excavation slopes and the ends of excavations shall be rounded where shown on the Plans, and these quantities will not be included in the quantities to be paid for as excavation. This work will be considered as a part of finishing slopes and no additional compensation will be allowed therefore.
300-2.6 Surplus Material. Unless otherwise shown on the Plans or in the Special Provisions, no surplus excavated material may be disposed of within the right -of-way. The Contractor shall make all arrangements for disposal of the material at offsite locations and shall, upon request, file with the Engineer the written consent of the owner of the property upon which it intends to dispose of such material.

Quantities of surplus material, if shown on the Plans or in the Special Provisions, are approximate only. The Contractor shall satisfy itself that there is sufficient material available for the completion of the fills before disposing of any indicated surplus material inside or outside the right-of-way. Any shortage of material, caused by premature disposal of the indicated surplus material by the Contractor, shall be replaced by it and no compensation will be allowed for such replacement.
300-2.7 Selected Material. Selected material encountered in excavation within the right-of- way shall be used as shown on the Plans, in the Special Provisions, or as directed by the Engineer. Topsoil excavated w ithin the limits of the Work may be considered as a selected material only for the purpose of backfilling areas to be planted.

300-4 UNCLASSIFIED FILL

300-4.1 General. MODIFY to ADD the following:

Fill should consist of approved earth materials free of trash debris, roots, vegetation, or other deleterious material.

The Contractor is required to take the necessary precautions to protect the existing vegetation along the perimeters outside the proposed grading daylight limits as shown on the Plans. Prio r to beginning the grading operations the Contractor and City’s construction representative shall walk the site and clearly establish the project grading limits, intents and the Contractor’s proposed means and methods.

Unclassified fill shall be inorgani c, non -expansive granular soils free from rocks or lumps greater than 6 inches in maximum dimension. Sources for import fill shall be approved by the City’s geotechnical engineer prior to their use.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
199

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 97 Grading & Compaction of the roadway shoulder and DG surface will be required within the City’s right away along the entire project limits. Contractor shall review the project limits with City prior to grading operations in order to verify limits of final grading.

300-4.2 Preparation of Placement Areas.

DELETE the last part of the 2nd sentence and SUBSTITUTE with the following:
. . . to a relative compaction of at least 90 percent.

SECTION 301 - SUBGRADE PREPARATION, TREATED MATERIALS, AND PLACEMENT OF BASE

MATERIALS

301-1 SUBGRADE PREPARATION.
301-1.1 General. Add the following:

Subgrade soils shall be moisture conditioned to a minimum 2% above optimum moisture content to a depth of at least 12 inches, compacted to 95% relative compaction per ASTM D1557, unless there is underlying untreated base materials in the pavement section. This subgrade soil will be evaluated, for verification and approval by the Engineer, prior to payment. Where highly granular soils are encountered in fills, deviations to this moisture criterion may be considered on a case -by-case basis based on field conditions and review/acceptance by the Geotechnical Consultant.

The City will furnish the first tests at no cost to the Contractor. Any retesting required due to first test failures shall be made by the City’s Engineer at the Contractor's expense, cost of which shall be deducted from the Contractor's final payment.

The cost of furnishing and applying water and all other work necessary for subgrade preparation, as directed by the Engineer, shall be included in the Contractor's bid price for other items.

Subgrade soils should be in a stable, non -pumping condition prior to placing proposed improvements.

301-1.6 Adjustment of Manhole Frame and Cover Sets to Grade. After the last paragraph, ADD the following text:

Removal and replacement of water valve frame and covers, adjustment of storm drain manhole frames and covers, and adjustment of sewer manhole frames and covers to grade shall conform to the provisions of Section 301-1.6 and 302-5.8 of the Standard Specifications and the following additions and revisions:

Removal and replacement of Irvine Ranch Water District (IRWD) water valves to grade shall conform to IRWD Standard Plan W-22, adjusting IRWD sewer manhole frames and covers to grade shall conform to IRWD Standard Plan S-1. IRWD will supply new valve cans and lids. Contractor shall coat top surface of Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
200

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 98 lids according to IRWD System C-2. Contractor shall coat the top surface of manhole lids and frames with one coat, color black, 0.5 mils dry-film thickness of Carboline 890 VOC (or approved equal). Prior to coating, surface shall be cleaned by wire brushing to remove asphalt and debris)

All surface utility covers (even those to be adjusted to grade by others) shall be located in the field prior to beginning any work on this project. The Contractor shall remove existing concrete pads or collars that might interfere with the adjustment of the valve cover to the grade of the asphalt concrete surface. Any damage to existing utility systems or appurtenances by the Contractor shall be replaced at the Contractor's expense.

All water related work shall be done in conformance with the City of Irvine requirements and IRWD Specifications for Construction of Water Facilities. IRWD Standard notes have been included in Appendix D for reference. Water valves shall be accessible at all times. The Contractor shall notify the IRWD inspector at (949) 453-5300 forty-eight (48) hours in advance for inspection of this work.

The following method shall be utilized to adjust manhole frames and covers, water valve covers, and survey well monument covers.

a) After the asphalt concrete pavement overlay has been completed, circular holes shall be cut where the cover exists. The diameter of the circular hole shall be at least twenty-four inches (24") larger than the outer diameter of the cover.

b) The cover shall then be raised to the finished pavement grade and suitably blocked and concreted in place to the satisfaction of the Owner’s Representative.

c) A PCC collar shall be poured around the cover to an elevation no more than two inches (2”) below finished pavement grade. Said PCC collar shall have a minimum depth of eight inches (8") or (as shown per plan) and be placed over four inches (4") of crushed aggregate base (CAB), thoroughly compacted to 95% minimum relative compaction.

d) After the concrete has cured sufficiently, a tack coat shall be applied and ARHM-GG-C surface course material shall be placed to finished pavement grade.

The Contractor shall also be responsible for coordinating his work with the various utility owners who will be required to adjust their own surface utility covers to grade as noted on the Plans. This includes tying out their covers and notifying all surface utility owners prior to performing any work that will affect their facilities. If the required adjustment of the owner adjusted utility covers will impact the Contractor’s subsequent work then the Contractor shall coordinate his work schedule and/or perform follow up work to ensure that the quality of the final product is not compromised.

301-2 UNTREATED BASE
301-2.1 General After the last paragraph, ADD the following text:

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
201

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 99 Proposed improvements may require minor import and backfill and compaction of additional base material. Such minor import associated with bid items shall be included in the cost of the respective bid item unless noted otherwise.

SECTION 302 - ROADWAY SURFACING
302-1 COLD MILLING OF EXISTING PAVEMENT.
302-1.1 General. After the last paragraph, ADD the following text:

Cold milling shall conform to the details shown on the Plans and these Special Provisions. All temporary striping required after cold milling operations shall be installed per City Standards. All required temporary striping shall be considered paid for under the bid item for Traffic Control. No additional compensation will be allowed.

Cold milling operations adjacent to new curb or curb and gutter shall be conducted after the construction of the proposed improvements unless approved otherwise by the City Engineer.

Residue from grinding shall not be permitted to flow or travel into gutters, onto adjacent street surfaces or parkways. All residues shall be completely removed by a vacuum sweeper and properly disposed.

Sweeping is to take place immediately after the grinding has been completed and as directed by the Engineer. No washing of any residue into gutters and/or drainage structures shall be allowed. The Contractor shall cover and protect all storm drain inlets prior to the start of cold milling operations.

All pavement transitions and temporary striping/markings shall be in place prior to the opening of a lane for traffic. Any pavement grade differential between adjacent lanes that will, with the permission of the Engineer, remain during non-working hours shall be indicated with the appropriate warning signage.

Cold mix 6:1 AC tapers shall be placed and maintained at the interface between milled and non-milled areas as well as at manholes, valves, and bus pads to eliminate the hazard caused by sudden elevation differences, especially in pedestrian path of travel areas adjacent to wheelchair ramps, and shall be removed prior to placement of surface course pavement.

The Contractor shall provide access and detour signing at all times for pedestrian facilities and bike lanes when cold milling.

The Contractor is to notify the Engineer at least two (2) working days prior to and immediately after the cold mill operations so that observations and measurements may be made of areas before the placement of permanent asphalt.

302-5 ASPHALT CONCRETE PAVEMENT.
302-5.1 General. Add the following sentence at the end of the first paragraph:

The asphalt concrete design mix shall be submitted for approval by the City a minimum of two weeks prior to the start of AC construction.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
202

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 100

This work shall include the construction of asphalt concrete pavement cap, as shown on the plans, per these Special Provisions, the Standard Specifications, and as directed by the Engineer.

The work shall include controlling nuisance water, sweeping, watering, and removing loose and broken foreign material as specified in the Standard Specifications and these Special Provisions and as required by the Engineer.

The Contractor shall provide proper delineation, signing and flagger to keep traffic off of the freshly laid mat until it has been properly compacted and is set up sufficiently so that it will not be damaged by traffic. Surfaces damaged by traffic shall be replaced to the satisfaction of the Engineer.

If the finish surface of the asphalt concrete on the traffic lanes does not meet the specified surface tolerances, it shall be brought within the tolerances by either: (1) Placing an overlay of asphalt concrete, or (2) Removal and replacement. The method shall be selected by the Engineer.

When the Plans, Specifications or Standard Plans inadvertently specify AR -4000, the equivalent replacement course shall be PG 64-10.

Construction of pavement shall be coordinated with all other construction activities and utilities.

At decorative crosswalks and other transverse joints (to traffic), the Contractor shall remove the existing temporary AC wedges / ramps so that there is a clean vertical face against the construction join in order to allow the construction of the full design pavement lift thickness.

Tarpaulins shall be used to cover all loads from plant to project site.

Weed Abatement and Crack Sealing:

In areas requiring grind and overlay, prior to the paving activities the contractor shall be required to conduct weed abatement and crack sealing operations for any cracks that remain after the cold milling operation is completed.

Soil Sterilant shall be "Poly-Bor Chlorate" or Monbar Chlorate" (U.S. Borax and Chemical Corporation, or approved equal), applied in solution of one (1) pound of chemical to one (1) gallon of water at least 10 days prior to placing of the Rubberized Asphalt Overlay. The sterilant shall be applied to cracks larger than one-fourth (1/4) inch with a paddle agitator spray rig. The Contractor shall provide all necessary protection to prevent injury to animals or adjacent plant life and property occasioned by the application of the soil sterilant. The Contractor will be held responsible for all personal injury or property damage caused by the application or storage of soil sterilant.

The crack sealant shall be a type “D” joint sealant per Section 201-3.7 of the Standard Specifications and shall be ROADSAVER II by Crafco or approved equal. The contractor shall submit for approval the material he intends to use for crack sealant two (2) weeks prior to its incorporation into the work. Crack sealant shall be applied per manufacturer and industry recommendation.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
203

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 101

302-5.2 (Not Used)
[Remove and replace with the following section:]
302-5.2 Testing

All quality assurance testing shall be done by the Contractor. Prior to delivery of each shipment of asphalt concrete to the job site, the Contractor shall test and provide results and certification to the City, to insure the conforming of the material and its integral components with the prescribed requirements.

The test reports, signed by the Contractor’s materials testing representative, shall certify that the product delivered conforms to the specifications for the type and grade indicated. The certified test reports and the testing required in connection with the reports shall be at no cost to the City.

The vendor supplying the material will deliver to the purchaser with certified copies of the test reports, indicating the name of the vendor. Type and grade of asphalt delivered, date and point of delivery, quantity delivered, delivery ticket number, purchase order number and result of specified test conducted by the Contractor.

The Contractor shall notify the Engineer a minimum of five (5) working days prior to the performance of paving work for inspection by the City.

302-5.4 Tack Coat. Add the following:

Tack Coat shall be applied between base and surface courses when the surface course is not placed immediately after the base course, between lifts after a lift has cooled, and to existing horizontal and vertical concrete surfaces against which paved surfaces where new asphalt concrete overlaps or abuts existing pavement. Tack Coat shall be as specified in Section 302-5.4, “Tack Coat” of the Standard Specification and per these Technical Specifications. There shall be no separate payment for Tack Coat.

302-5.5 Distribution and Spreading.

Delete the fourth paragraph and substitute the following:

Asphalt concrete shall not be placed until the atmospheric temperature is a minimum of 50ºF and rising, and the surface temperature of the underlying material is a minimum of 40ºF. Asphalt concrete shall also not be placed during unsuitable weather.

Fully automatic screeds will be required on this Project. A fully automatic screed shall have a sled, 30 feet in length, on the side of the machine which will receive the next mat of material. A joint maker, ski, etc., placed on the side of the machine to ride on the existing or previously constructed surface or mat of asphalt concrete material may be required as directed by the Engineer.

The surface course shall flush with adjacent existing pavement surface. Maximum variance of 1/8 - inch. Surface course adjacent to edge of gutter shall have a 3/8-inch lip over the top longitudinal edge of the gutter.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
204

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 102

Manhole (and other structures): Contractor shall be required to protect and maintain existing utility access frames, grates, and lids during paving operations. No grade difference at lip, between utility frame and asphalt concrete finished grade pavement, should be allowed.

302-9 ASPHALT RUBBER HOT MIX (ARHM)
302-9.1 General. MODIFY to ADD the following:

All ARHM shall comply with section 203-11 of the Standard Specifications. The Contractor shall submit a copy of the asphalt concrete mix design, a sample of the asphalt concrete, a sample of the aggregate, and a sample of the paving asphalt to the City or its designated laboratory a minimum of two weeks prior to the start of construction.

The Contractor shall use a PG Asphalt Binder.

PG Asphalt binder shall conform to the following requirements:

Description
Asphalt shall consist of refined petroleum or a mixture of refined liquid asphalt and refined solid asphalt, prepared from crude petroleum. Asphalt shall be free from residues caused by the artificial distillation of coal, coal tar, or paraffin, free from water and homogeneous.

Materials
The Contractor shall furnish asphalt in conformance with the State of California Department of Transportation (Caltrans) "Certification Program for Suppliers of Asphalt." Caltrans maintains the program requirements, procedures, and a list of approved suppliers at:
http://www.dot.ca.gov/hq/esc/Translab/fpmcoc.htm.

The Contractor shall ensure the safe transportation, storage, use, and disposal of asphalt.

The Contractor shall prevent the formation of carbonized particles caused by overheating asphalt during manufacturing or construction.

Sampling
The Contractor shall provide a sampling device in the asphalt feed line connecting the plant storage tanks to the asphalt weighing system or spray bar. The sampling device shall be accessible between 600 and 750 mm above the platform. The Contractor shall provide a receptacle for flushing the sampling device.

The sampling device shall include a valve:

1. With a diameter between 10 and 20 mm

2. Manufactured in a manner that a one-liter sample may be taken slowly at any time during plant operations

3. Maintained in good condition
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
205

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 103

The Contractor shall replace failed valves. In the presence of the Engineer, the Contractor shall take 2 one-liter samples per operating day. The Contractor shall provide round friction top containers with one-liter capacity for storing samples.

302-9.3 Distribution and Spreading. MODIFY to ADD the following:

The Contractor shall make modifications to the proposed mix design as required by the City or its designated laboratory to insure that the proposed asphalt concrete mix will meet the minimum stability ("S") values. No asphalt concrete shall be placed until such time as the City has tested and approved the Contractor's proposed asphalt concrete mix design. Aggregate produced from slag resulting from any steel-making process or from air-cooled iron blast furnace slag shall not be used on this project.

Asphalt concrete shall be placed with a paving machine equipped with a "Preco" attachment or similar device for use in obtaining constant cross- slope and maximum joint quality.

Apply SS-1H tack coat at a rate not to exceed one-tenth (1/10) gallon per square yard uniformly in one coat on all vertical joins of AC patching and P.C.C. surfaces and edges against which ARHM is to be placed. Diesel fuel shall not be used for cleaning purposes within the limits of this project.

All surfaces to be overlaid shall be cleaned by the use of a broom and a vacuum sweeper. The overlaid surface shall be free of water, dust, or foreign material before tack coat is applied. All raised pavement markers shall be removed prior to the placement of any asphalt concrete overlay. Removal of all AC slurry seal residue from gutter edge should be completed prior to paving.

The Contractor shall utilize a paving machine equipped with an automatic adjusting screed, which is actuated by a 30-foot "ski", for the entire ARHM overlay.

Breakdown compaction shall be performed with a two-axle or three-axle tandem or three-wheel roller weighing not less than 12 tons for all ARHM lift thickness of four (4) inches or less. Breakdown compaction shall be performed with a vibratory roller weighing not less than 12 tons for all ARHM lift thickness between two (2) and four (4) inches. When more than one layer of ARHM is required, the layers shall be of equal thickness.

302-9.4 Rolling. MODIFY to ADD the following:

Rolling along a joint shall be such that the widest part of the roller is on the hot side of the joint. Join lines between successive runs shall be within six (6) inches of lane lines or a minimum of twelve (12) feet outside of the outer most lane line.

Lots consisting of 500 tons will be established for ARHM areas to be tested. The City or its designated laboratory shall perform density testing utilizing a properly calibrated nuclear asphalt-testing device.

The City shall pay for all initial testing and a reasonable amount of retesting utilizing the nuclear asphalt- testing device. If the test results for any lot of ARHM indicate that the relative compaction is below 95 Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
206

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 104

percent the Contractor will be advised that he is not attaining the required relative compaction and that his materials or his procedures, or both, need adjustment. ARHM spreading operations shall not continue until the Contractor has notified the Engineer of the adjustment that will be made in order to meet the required compaction. Core testing of areas not meeting the 95 percent requirement will be conducted by the City's designated lab. Any and all testing beyond the initial core testing will be at the sole expense of the Contractor.

If the test results for any lot of ARHM continue to indicate that the relative compaction is less than 95 percent after adjustments have been made, the ARHM represented by that lot may be required to be removed and replaced at the Contractor's expense and the Contractor shall suspend all further paving operations until the Contractor can demonstrate to the City that relative compactions of 95 percent can be obtained. It shall be the sole judgment of the City Engineer to determine adequate remedy and/or a reduction in compensation for any lot failing to meet 95 percent relative compaction.

The City's designated laboratory will obtain samples of the ARHM from each lot to perform extraction tests to insure the proper aggregate gradation and asphalt content is being supplied in accordance with the approved ARHM mix design. If the test results for any lot of ARHM indicate that the ARHM does not meet the requirements of the approved mix design the Contractor will be advised that he is not attaining the required composition and grading and that his materials need adjustment. ARHM spreading operations shall not continue until the Contractor has notified the Engineer of the adjustment that will be made in order to meet the approved mix design. If the test results for any lot of ARHM continue to indicate that the composition and grading does not conform to the approved mix design after adjustments have been made, the ARHM represented by that lot shall be removed and replaced at the Contractor's expense and the Contractor shall suspend all further paving operations until the Contractor can demonstrate to the City that the ARHM is in accordance with the approved mix design.

The Contractor shall provide for adequate quality control measures to insure that delivery of asphalt rubber shall be neither too slow nor too fast to prevent stopping of the paving operation and/or cooling of the asphalt rubber material. Material delivery scheduling and handling is critical to provide for optimum compaction opportunity and maximize ride quality performance.

302-9.7 Rock Dust Blotter. MODIFY to ADD the following:

Rock dust blotter material shall be required immediately after the completion of the "finish rolling" and prior to opening to traffic to prevent bleeding and tracking of the asphalt rubber material.

All excess rock dust blotter shall be removed from the street at the end of each workday. The removal of the rock dust blotter shall include removal from adjacent streets as needed. No excess rock dust blotter shall be left on any street after normal work hours. The cost of this application will be included into the contract unit price bid for ARHM.

SECTION 303 – CONCRETE AND MASONRY CONSTRUCTION

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
207

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 105

303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.
303-5.1 Requirements
303-5.1.1 General. ADD the following subsections:

303-5.1.1.1 Curbs

Curb and gutter and median curb shall be per City of Irvine Standard Plan No. 200, Type as indicated on the Plans.

Concrete curb and gutter, and median curb shall be constructed to the line and grades shown on the Plans or as ordered by the Engineer. Existing curb and gutter to be joined shall be saw cut on a neat, straight line at the join location. Curb or curb and gutter construction shall occur prior to all cold milling and paving operations.

Construction shall include the saw cutting and full AC reconstruction of a 2’ wide portion of AC pavement next to the curb or curb and gutter.

303-5.1.1.2 Sidewalk

Concrete sidewalk shall be constructed to the line, grades and designs shown on the Plans or as ordered by the Engineer. Existing surfaces to be joined shall be sawcut on a neat, straight line at the join location. The contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.

This work item shall also include all necessary natural ground and miscellaneous excavation, removal and export as may be required to install the new 4” PCC Sidewalk and necessary irrigation system modifications, protection and adjustments that may be required. The Contractor shall also be required to conduct all necessary grading at the new back of walk in order to ensure that full ADA compliance is achieved within the new sidewalk areas.

Import of miscellaneous fill material to fill any resultant void spaces shall be included in the unit price of the sidewalk.

303-5.1.1.3 Curb Ramp

Curb ramp shall be completed in accordance with City of Irvine Standard Plan 202, or SPPWS 111-5 per the Plans, and these Special Provisions.

The Contractor shall be responsible to layout the proposed ramps to comply with the maximum grades shown on the plans. Limits of the new curb ramp shall be reviewed and approved by the Engineer prior to saw cutting. Typical construction tolerances to construct the new curb ramp shall not apply and maximum grades indicated on the Plans shall not be exceeded. If a newly constructed ramp is deemed Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
208

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 106

non-compliant with the standards and requirements shown on the plans, the Contractor shall be responsible to remove the curb ramp and reconstruct a new curb ramp at his own cost.

All new curb ramps shall have a zero-inch (0”) lip of gutter at the curb ramp opening, and a cast-in-place detectable warning surface per these Special Provisions.

Where the type of curb ramp includes a retaining curb to make up for a difference in elevation between the existing grade and curb ramp grade, the construction of said retaining curb shall be considered as part of the curb ramp work.

The Contractor shall verify, with a “smart level”, that maximum ramp and sidewalk grades do not exceed the maximum grades and pertinent details on the Plans when marking the required saw cut removal limits and when setting the concrete forms, prior to pouring any curb ramp locations. It shall be the Contractor’s responsibility to supervise and utilize the proper experienced personnel to ensure that the proper saw cut limits are established for all curb ramp locations and the City shall not be responsible to direct the Contractor’s crews or otherwise serve in this management capacity. The Engineer shall be present to verify the concrete forms, prior to the Contractor pouring any PCC construction improvements.

Sub-grade materials shall be compacted to a minimum relative compaction of 95 percent. Adjacent AC removal and replacement shall conform to the requirements established in these Specifications and shall be considered included in the unit price for the PCC curb ramp construction.

Curb and gutter as well as a 2 foot wide sawcut and full depth slot pave shall also be included in the unit price of the curb ramps.

Special Note To Contractor:

Prior to constructing a curb ramp where physical site constraints do not allow the curb ramp construction to fully meet the required standards and pertinent details on the Plans, the Contractor shall so notify the Engineer for direction.

The curb ramp construction work shall include all related adjustments of pull boxes, pull box covers, and protection of traffic signal poles and signs that fall within the proposed PCC curb ramp construction limits.

303-5.1.3 Driveway Entrances. Driveway entrances sha ll be provided in new curb at all existing driveways along the line of the work, at locations shown on the Plans, and at such other locations as may be designated by the Engineer.

The fully depressed curb opening at driveway entrances shall be 1 inch (25 mm) above gutter flowline at the curb face. The top of the fully depressed portion of the curb shall be finished to a transverse slope toward the gutter of 3/4 inch (19 mm).

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
209

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 107

Where a walk is to be constructed across driveways to commercial establishments, the thickness thereof shall be 6 inches (150 mm) unless otherwise specified or shown on the Plans. At residential driveways, the thickness of the walk will be 4 inches (100 mm) unless otherwise specified or shown on the Plans.

303-5.5.5.1 Detectable Warning Surface.

Detectable warning surface shall extend the full width and 3’ depth of the ramp. A 4’ wide detectable warning surface may be used on a 4’-2” wide curb ramp.

The detectable warning surface required for new curb ramps shall be CAST-IN-PLACE DETECTABLE WARNING SURFACE, MANUFACTURED BY ACCESS TILE (562) 842-9934, www.accesstile.com, (Part #:

ACC-R3x4-BK) or approved equal. Shop drawings and color sample for the truncated dome panels shall be provided to the Engineer for approval. Truncated dome panels shall not be installed prior to the Engineer’s approval of the shop drawings and color sample.

The orientation of the dome pattern for all panels shall be parallel with the panel edges.

The color of the truncated dome panels shall be Onyx Black conforming to Federal Color No. 17038. Any color deemed unacceptable by the Engineer, including gray and dark gray, shall be rejected.

Detectable warning surface shall be installed per the manufacturers’ recommendations and instructions.

The finished surface shall be free from blemishes.

The Contractor shall submit to the Engineer for review the following items:

1. Product Data: Submit manufacturer’s literature describing products, installation procedures and routine maintenance.

2. Samples: Submit two tile samples of the kind proposed for use (minimum size 6” by 8”).

3. Materials Test Reports: Submit test reports from qualified independent testing laboratory indicating that materials proposed for use are in compliance with requirements and meet the properties indicated. All test reports shall be conducted on a cast-in-place tactile tile system as certified by a qualified independent testing laboratory.

4. Maintenance Instructions: Submit copies of manufacturer’s specified maintenance practices for each type of tactile tile and accessory as required.

The manufacturer shall provide a written minimum 5-year warranty for prefabricated detectable warning surfaces, guaranteeing replacement when there is a defect in the dome shape, color fastness, sound on cane acoustic quality, resilience, or deterioration of the detectable warning surface. The warranty period shall commence on the date of acceptance of the project by the Engineer.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
210

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 108

SECTION 313 – UTILITY & IRWD ADJUSTMENTS

GENERAL: The Contractor will be required to contact Southern California Edison, The Gas Company, AT&T, cable television, and/or other utility facilities to have existing utilities adjusted to finish grade. The Contractor shall coordinate with each utility company for the adjustment of their facilities.

313-1 Adjust IRWD Manhole To Grade (Sewer, Storm Drain, and Electrical) [Add new section].

Contractor shall adjust existing manholes t o grade conforming to section 302 -5.8 and all applicable sections of the Standard Specifications where shown on the plans or as required by the Engineer.

Adjustment to grade of manholes shall conform to the provisions of the City of Lake Forest or affected utility Standard Plans.

Work shall include the removal or furnishing of grade rings as necessary to adjust the manhole to grade as necessary.

All manholes shall be thoroughly cleaned and any construction debris removed which may have entered the manhole due to the Contractor’s operations.

Contractor shall notify the Irvine Ranch Water District for coordination of manhole adjustment of their facilities at least two working days prior to beginning work. 313-2 Remove and Replace IRWD Water Valve Box and Cover [Add new section].

With respect to the bid item of Remove And Replace IRWD Water And RW Valve Box And Cover at the locations shown on the plans, the Contractor is required to pick up new valve box and covers at the IRWD office to replace all the existing valve boxes encountered in areas within the project

Contractor shall remove existing and replace with the new Domestic Water and reclaimed water valve frames and covers per IRWD Standard Plan W-22 and IRWD standard general technical specifications such as, but not limited to, 15100.

Valve box and cover shall be replaced/adjusted after finish grade has been established.

313-3 Adjustment of Water, Electric, Telecommunication, Storm, and Sewe r Manhole Frame and Cover Sets to Grade. Utility manhole and vault frames and covers within an area to be paved or graded will be set by the owners thereof to finished grade. Sewer and storm drain manhole frames within the area to be paved or graded shall be set to finish grade by the Contractor. Manholes in asphalt concrete pavement shall be set to finish grade in accordance with provisions of 302-5.8. In the case of Portland cement concrete pavement, manhole frames shall be set to finish grade before paving. Repaving required as a result of reconstructing or adjusting all manhole and vault frames and covers to grade shall be the responsibility of the Contractor and the cost thereof shall be included in the bid item for pavement.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
211

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 109

The Contractor shall remove all debris from the interior of manholes and shall clean all foreign material from the top of the frames and covers.

313-4 Remove and Replace IRWD Water Valve Box and Cover [Add new section]. 313-4.1 DESCRIPTION. This work shall consist of furni shing and installing Portland cement concrete right-of-way monuments and cast -in-place survey monuments at the locations shown on the Plans, in the Special Provisions, or as directed by the Engineer. 313-4.2 MATERIALS. The concrete portion of monuments shall be constructed in accordance with 201-1 and 303.

Marker plates for survey monuments will be furnished by the Agency at the Work site. 313-4.3 CONSTRUCTION. Survey monuments shall be cast-in-place in neat holes without the use of forms. The exposed surface of the finished monuments shall be uniform, of even texture, and shall be free of holes, cracks, and chipped edges.

Marker plates or copper bars shall be placed in survey monuments before the concrete has acquired its initial set and shall be firmly bedded in the concrete. The concrete shall be so located that when the plate is inserted, the reference point will fall within a 1 inch (25 mm) circle in the center of the plate.

Monuments shall be set firmly and vertically in the ground to a depth of a t least 3 feet (0.9 m).

The tops of survey monument covers shall be set flush with the groundline or pavement surface, whichever applies.

8.7. PART 4 - EXISTING IMPROVEMENTS
SECTION 400 – PROTECTION AND RESTORATION
400-1 GENERAL. REPLACE the second paragraph with the following:

The Contractor shall relocate, repair, replace or reestablish all existing improvements within the project limits which are not designated for removal (e.g., curbs, gutters, sidewalks, driveways, fences, w alls, sprinkler systems, signs, utility installations, pavements, and structures) which are damaged or removed as a result of the Contractor operations.

Where existing traffic striping, pavement markings and curb markings are damaged or their reflectivity reduced by the Contractor's operations, such striping or markings shall also be considered as existing improvements and the Contractor shall repaint or replace such improvements.

Relocations, repairs, replacements or reestablishments shall be equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified.

ADD the following after the last paragraph:

Construction Survey Requirements:

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
212

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 110

Field survey data for Dimension Drive and Civic Center Drive were not obtained during the course of the design for this project. In order to provide adequate elevation and cross sectional control during the course of roadway reconstruction, this contract requires that additional construction survey efforts be conducted on all roadway segments designated for reconstruction. Specifically, all work associated with Dimension Drive and Civic Center Drive (within the reconstruction limits), shall include the following additional survey tasks:

1. Prior to ANY roadway demolition, Contractor shall conduct a pre-demolition survey that includes existing roadway sections at 25’ O.C. to include Top of Curb, FL, LIP, ¼ PT, and CL of the roadway on both sides of the street

1. NOTE – if crown of roadway does not correlate with the centerline or edge of median, additional data points shall be provided to depict the crown location for the roadway

2. All Intersections shall be surveyed with a 10’ grid to depict the existing grid elevations for the intersection.

3. Survey data shall be submitted to the City in CAD format with Civil 3D data points formatted in the PNEZD format

4. Contractor shall allow 10 working days for the City to review and provid e any recommended modifications to the roadway crown or section along the roadway limits

5. During the course of construction, Contractor shall provide stakes/cut sheets and verify the field elevations at the following stages:

1. Bottom of Excavation

2. Top of CMB

3. Top of Base AC Paving

4. Top of Finish AC Paving

1. Contractor shall coordinate with field inspector and City Engineering staff during construction to verify field elevations

All costs associated with the above noted construction survey and staking requirements shall be included in the Construction Staking and Survey bid item.

400-3 PAYMENT. Replace with the following:

All cost to the Contractor for protecting, removing, restoring, repairing, replacing, or reestablishing existing improvements shall be included in the bid in other items of work unless otherwise specified.

SECTION 402 – UTILITIES

402-1 LOCATION 402-1.1 General

[Replace the first sentence of the first paragraph with the following:]

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
213

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 111

It shall be the Contractor's responsibility alone to determine the location of underground utilities or substructures of every nature and to protect them from damage.

The Contractor shall pothole all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by the Work.

[Replace Section 402-1.2, “Payment,” with the following:]

402-1.2 Existing Utilities

1. Existing utilities are located within the limits of work. The Contractor shall confirm locations of all utilities and protect them in place or relocate as required.

2. In the event any such unknown substructures should be disturbed or damaged due to failure of the Contractor’s exercising reasonable care, the Contractor shall at once make the necessary emergency repair at no cost to the owner.

3. Prior to the commencement of work, the Contractor shall verify the location and depth of all utilities, including service laterals and service connections, which have been indicated on the Plans marked by the respective owners and which may affect or be affected by its operations.

4. All utilities designated on the Plans to be protected in place shall be carefully uncovered if located within the lines of excavation and time shall be allowed for the Engineer to field check the location of such utilities to make certain that they will not interfere with construction. In the event a utility conflict exists, the AGENCY will either arrange for utility owner to relocate the utility or adjust grade and/or alignment of the proposed improvement.

5. In the event any such facility should be disturbed or damaged, the Contractor shall at once make repairs to the satisfaction of the owner, or arrange with the owner to make repairs, at no cost to the AGENCY. Any delays or reconstruction of improvements resulting from the Contractor’s failure to verify utility locations and depths shall be made at the Contractor’s expense.

6. The Contractor’s attention is directed to the utility notification service provided by UNDERGROUND SERVICE ALERT (USA). USA member utilities will provide the Contractor with the locations of their substructures in the construction area when the Contractor gives at least 2 working days’ notice to Underground Service Alert by calling 1-800-422-4133. The Contractor shall call USA prior to any work (such as backfilling, paving) over substructures to allow owners to locate and/or obtain accurate “ties” on their manholes, valve covers, meter boxes, etc.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
214

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 112

8.8. PART 6 – TEMPORARY TRAFFIC CONTROL
REVISE as follows:

SECTION 600 – ACCESS

600-2 VEHICULAR ACCESS. DELETE in its entirety and SUBSTITUTE with the following:

Vehicular access to residential driveways shall be maintained to the property line except when necessary construction precludes such access for reasonable periods of time. If backfill has been completed to the extent that safe access may be provided, and the street is opened to local traffic, the Contractor shall immediately clear the street and driveways and provide and maintain access.

Safe, adequate, continuous and unobstructed vehicular access shall be maintained to fire hydrants, residences, commercial and industrial establishments, churches, schools, parking lots, service stations, motels, fire and police stations, bus stops, hospitals, etc., unless otherwise approved by the Engineer.

During non-working hours or when work is not scheduled, all roadway lanes shall be returned to their full traffic use by backfilling and paving open trenches unless otherwise approved by the Engineer. At the end of the workday, the Contractor shall remove all Traffic Control Devices not in use.

The Contractor shall replace vehicle loop detectors damaged by the Contractor’s operations, at its own expense within 24 hours of the damage. The Contractor shall replace existing loop detectors, shown on the plans to be replaced, within 24 hours from when they are removed from service.

If the Contractor proposes temporary alternate detection methods, video or wireless, the Contractor shall provide submittals of the alternate methods for acceptance by the Engineer in accordance with 2-

5.3 of the Standard Specifications and the Special Provisions. The cost for providing all temporary detection methods shall be as included in the various items of Work and no additional compensation will be allowed therefor.

600-3 PEDESTRIAN ACCESS. DELETE in its entirety and SUBSTITUTE with the following:

Safe, adequate, continuous and unobstructed pedestrian access shall be maintained to sidewalks, cross walks, residences, commercial and industrial establishments, churches, schools, parking lots, service stations, motels, fire and police stations, hospitals, etc., unless other arrangements satisfactory to the Agency have been made by the Contractor and accepted by the Agency. Pedestrian access and paths shall meet federal, state and Agency ADA requirements.

ADD:
600-4 CONSTRUCTION PARKING CONTROL. The Contractor shall control vehicular parking to preclude interference with public traffic or parking, access by emergency vehicles, owners operations, or construction operations, and monitor parking or construction personnel private vehicles by maintaining free vehicular access to and through parking areas and prohibit parking on or adjacent to access roads, or in non-designated areas.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
215

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 113

ADD:
600-5 SITE ACCESS. When entering or leaving roadways carrying public traffic, contractors’ equipment, whether empty or loaded, shall in all cases yield to public traffic.

SECTION 601 – WORK AREA TRAFFIC CONTROL
REVISE as follows:

601-1 GENERAL. DELETE in its entirety and SUBSTITUTE with the following:

The Contractor shall provide and maintain all construction area traffic controls in accordance with Part 6 of the Standard Specifications, the latest version of the (MUTCD), and Work Area Traffic Control Handbook (WATCH), and these Special Provisions.

Portable delineators (traffic cones are not allowed) which conform to the current California Manual of Uniform Traffic Control Devices (CA MUTCD) shall be spaced as necessary for proper delineation of the travel way. The spacing between delineators shall not exceed 50 feet. The minimum lane transitions shall be a 50 to 1 taper unless otherwise shown on the plans. Double base delineators will be required.

If the portable delineators are damaged, displaced or are not in an upright position, from any cause, said portable delineators shall immediately be replaced or restored to their original location, in an upright position, by the Contractor.

Where construction detours and signing conflict with existing signing, the Contractor shall cover existing signs in a manner approved by the Agency's Representative. The Contractor shall also provide temporary traffic delineation per 602 at the conclusion of each working day, if not sooner, as directed by the Agency's Representative, for any centerline, painted median or lane line which is obliterated by construction.

The Contractor shall provide temporary delineation as directed/accepted. Temporary delineation shall include removal of conflicting markings by accepted means; installation and removal of temporary centerlines or lane lines, detour signing, barricading; and replacement of traffic lines and markings in their proper locations upon termination of the detour. Conflicting existing and temporary striping, as required for traffic control during construction, shall be removed by the Contractor by methods accepted by the Engineer. Blacking out the pavement will not be allowed. Temporary reflective striping tape may be used, except that it shall not be applied to final asphalt surfaces. Tape shall be removed from temporary surfaces prior to placement of additional asphalt.

The Contractor shall maintain a 24-hour emergency service to remove, install, relocate, and maintain warning devices and shall furnish to the Agency's Representative, names and telephone numbers of three persons responsible for this emergency service. In the event the Contractor does not promptly respond when notified, the Agency may make corrections at Contractor’s expense.

Each workday, the Contractor shall ensure traffic control is in place prior to starting construction.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
216

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 114

Should the Contractor appear, in the opinion of the Engineer, to be lacking in providing adequate warning devices and protective measures as above provided, the Engineer may direct attention to the existence of a hazard, and the necessary warning and protective measures shall be furnished and installed by the Contractor, at his/her expense. Should the Engineer point out the inadequacy of warning and protective measures, such action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate its obligation to furnish and pay for these devices.

The Contractor shall notify local Police and Fire Departments of its intent to begin work at each location at least ten (10) days before work is to begin. The Contractor shall cooperate with local authorities relative to handling traffic through the area. The Contractor shall also coordinate with OCTA to ensure the safe operation of buses and access to bus stops in the construction area.

No work that interferes with public traffic shall be performed except during the hours specified for lane closures 601-6.6.

Existing traffic loop detector replacement shall be required as necessary such that no traffic signal loop is out of operation at the end of the workday. The cost for providing all temporary traffic signal loop detectors shall be included into the various related items of work and no additional compensation will be allowed; this includes traffic signal loop detectors damaged by the Contractor’s operations not designated for replacement in the contract plans.

Areas requiring edge cold mill shall be cold milled not more than three (3) Calendar Days prior to AC paving. Areas requiring digouts shall be repaved and open for traffic at the end of the same day.

The Contractor shall maintain access to all driveways at all times.

601-2 TRAFFIC CONTROL PLAN (TCP). DELETE in their entirety 2nd, 3rd and 4th paragraphs and SUBSTITUTE with the following:

The Contractor shall provide a plan prepared and stamped by registered civil engineer in the State of California for approval by the Agency prior to commencing Work of the Contract. Allow a minimum of fifteen (15) Working Days for the first Agency review and ten (10) Working Days for subsequent reviews.

The Contractor shall legibly indicate the following information on a reproducible drawing.

1. All lane closures and/or detours anticipated during construction.

2. Temporary signage, striping and delineation.

3. Special traffic control requirements.

The Contractor shall submit two (2) prints of approved drawings to Agency Representative, and retain one (1) print at construction site.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
217

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 115

ADD:
601-7 STREET CLOSURE, DETOURS, BARRICADES. Unless shown on the plans, no street closure shall be allowed.

The Contractor shall construct the proposed improvements to minimize public inconvenience. The Contractor shall provide ADA accessible pedestrian detours around construction areas.

The Contractor shall have all Traffic Control Devices properly installed prior to commencing construction and shall maintain these devices to ensure proper flow and safety of traffic while working in the street.

The contractor shall be responsible for any additional Traffic Control Devices deemed necessary by the Engineer to assure public safety at all times.

ADD:
601-8 STORAGE OF EQUIPMENT. Unless otherwise authorized in writing by the Engineer, construction materials may not be stored in streets, roads, or highways beyond the end of each Working Day. No equipment shall be stored within limits of the acquired temporary construction easements at any time.

Construction equipment shall not be stored at the work site before its actual use on the Work nor for more than two (2) Calendar Days after it is no longer needed on the Work. Time necessary for repair or assembly of equipment may be authorized by the Agency.

Excavated materials, except that which is to be used as backfill in the adjacent trench, may not be stored in public streets, roads, temporary construction easements, or highway unless otherwise permitted.

After placing backfill, all excess material shall be removed immediately from the site.

The Contractor shall submit an equipment-staging plan for approval by the Engineer. The plan shall address the use of private property for the staging, unloading, loading, and storing of equipment. The Contractor shall obtain an agreement from private property owners prior to the start of the project. The agreement shall release and hold the Agency, the Engineer, the Agency Representative and their consultants harmless from claims for damages. Failure to file a plan or obtain written approval from private property owners is considered a breach of Contract and subject to all remedies and enforcement procedures specified in the Contract Documents.

ADD:
601-9 TRAFFIC REGULATIONS.
601-9.1 General. Furnish, install and maintain Traffic Control Devices, equipment, materials, and other safeguards to provide safe and effective work areas, and to warn, control, protect and expedite vehicular and pedestrian traffic.

On daily basis, remove temporary traffic delineation, signage and other devices when no longer required. Restore areas to original or to specified conditions.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
218

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 116

601-9.2 Related Requirements. Traffic control work and Traffic Control Devices for construction shall conform to the latest edition of:

1. MUTCD

2. Work Area Traffic Control Handbook (WATCH manual)

3. Standard Specifications

4. O.S.H.A. requirements

5. California Vehicle Code

601-9.3 Construction Area Signs. The Contractor shall:

1. Use only signs that conform to the dimension, color, legend, reflectorization and lighting requirements of the current WATCH, MUTCD and the Contract Documents.

2. All sign panels shall be the product of a commercial sign manufacturer, but need not be new.

Used sign panels clean and in good repair, as determined by the Agency Representative, may be used.

3. Sign panels for portable signs may be metal, cotton drill fabric, flexible industrial nylon fabric or other approved fabric.

4. Temporary stop signs shall have a minimum clearance of seven (7) ft. from bottom of sign to existing ground or pavement.

5. Further requirements as discussed in the Contract Documents.

601-9.4 Flaggers. The Contractor shall provide flaggers as deemed necessary by the Engineer to give adequate warning to traffic or to the public of any dangerous conditions to be encountered, and employ only flaggers trained in flagging fundamentals and procedures referred to in the “Flagger Handbook” available on the Internet at the following website:
http://www.dot.ca.gov/hq/construc/flagging/flagging_handbook.pdf.

Payment for flagging is considered as included in the various items of work and no additional compensation will be allowed therefor.

601-9.5 Temporary Closure of Existing Traffic Lanes. Unless the traffic control, working hours and lane requirements are modified in the Special Provisions, the following requirements shall be followed:

1. When permitted by the Engineer, one (1) lane on each roadway adjacent to the working area may be closed to public traffic. Use of reflective or lighted traffic delineators to direct traffic away from excavations or other obstructions will be considered as a lane closure.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
219

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 117

2. A minimum of one (1) lane of traffic, twelve (12) feet wide, fourteen (14) feet wide if a lane is adjacent to an outside curb, in each direction, shall be maintained through the work area at all times.

3. A minimum of two (2) lanes of traffic, each being twelve (12) feet wide, fourteen (14) feet wide if a lane is adjacent to an outside curb, in each direction, shall be maintained through the work area at all times when the work area is within a major arterial highway unless otherwise approved.

4. When work is in progress within three (3) feet of a lane being used by public traffic, Contractor shall close the lane adjacent to the work. Reflective or lighted traffic delineators shall be placed to direct public traffic around the construction area in accordance with the requirements of this section. During non-working hours or when work is not in progress, position and maintain reflective traffic delineators in the 1 to 1-1/2 foot width of the existing traffic lane adjacent to the work.

5. On roads open to public travel, temporary lane closures are limited between the hours of 9:00 a.m. and 3:00 p.m. Closures of roads on Sundays, holidays, or between the hours of 3:00 p.m. and 9:00 a.m. are prohibited unless otherwise approved by the Engineer.

All Traffic Control Devices used between dusk and 6:00 a.m. shall be lighted or reflectorized. Agency approved arrow board(s) shall be used to direct public traffic on all roads.

Prior to the start of each work day, the Contractor shall perform all necessary work incidental to and commensurate with the proper signing, detouring, barricading, etc., that is required for that particular day's schedule of operations. No construction shall be permitted until such signing and detouring operations have been completed.

ADD:
601-10 PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS). Portable changeable message signs shall be furnished, placed, operated, and maintained as designated by the Engineer in conformance with the provisions in Section 12, “Construction Area Traffic Control Devices,” of the State Standard Specifications and these Provisions. The Contractor shall furnish four (4) PCMS. PCMS shall be in place a minimum of two (2) weeks prior to start of construction and remain in place for the duration of the construction project.

Approximate locations of the PCMS are as follows:

1. Begin & End Limits of El Toro Road Median (Total of 2)

2. Begin & End Limits of Jeronimo Road Widening (Total of 2)

601-11 FLASHING ARROW SIGNS. Flashing arrow sign shall be mounted on a truck or on a trailer and shall be capable of operating while the vehicle is moving or as directed by the Engineer. Signs mounted on the cab of a truck shall be mounted to provide a minimum of 7 feet between the bottom of the sign and the roadway. Signs mounted on a trailer, or on anything other than the cab of a truck, shall be mounted to provide a minimum of 8 feet between the bottom of the sign and the roadway.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
220

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 118

The total weight of trailer mounted flashing arrow sign including the trailer, sign, power source and other components shall not exceed 1,500 pounds and the height of the level trailer bed shall be no higher than 21 inches above the roadway. The trailer shall be equipped with a minimum of 3 leveling jacks.

Electrical energy to operate the sign shall be obtained from the vehicle on which the sign is mounted.

The supply of electrical energy shall be capable of operating the sign in the manner specified. The electronic circuitry shall provide between 30 and 45 complete operating cycles of the sign per minute in each of the modes specified.

Alternative types of lamps may be used in flashing arrow signs if visibility is equal to the specified lamps.

Each type AX flashing arrow sign shall be a minimum of 2 feet high and 4 feet wide, and shall be furnished with flat black enamel. A minimum of 13 No. 4414AX 12-volt, yellow or amber lamps shall be installed in the panel. The lamp configuration shall be for 3 arrowheads or an arrow shaft with 2 arrowheads, one pointing in each direction on the face of the sign with a minimum of 5 lamps forming each arrowhead. Each lamp shall be provided with a visor.

The lamp shall be activated by a switch on a control panel and shall be controlled by electronic circuitry to provide a minimum of 4 selectable modes of operation as follows:

Pass Left Mode - Sequencing of lighted arrowheads or sequencing the lamps forming the arrow shaft and arrowhead to the left or a flashing left arrow with the lamps in the arrow shaft and arrowhead flashing on and off simultaneously.

Pass Right Mode - Sequencing of lighted arrowheads or sequencing the lamps forming the arrow shaft and arrowhead to the right or a flashing right arrow with the lamps in the arrow shaft and arrowhead flashing on and off simultaneously.

Simultaneous Mode - Either the outside arrowheads pointing in opposite directions are continuously illuminated, except for the center lamp forming each arrowhead, while the arrow shaft lamps flash on and off simultaneously or the outside arrowhead pointing in opposite directions and the arrow shaft lamps all flash simultaneously to indicate passing on either side.

Travel Mode - Travel or caution mode shall flash in a manner not resembling any other mode.

8.9. PART 7 STREET LIGHTING AND TRAFFIC SIGNAL IMPROVEMENTS See Appendix D For all lighting and signal related specifications

8.10. PART 8 LANDSCAPING AND IRRIGATION
See Landscape Architect Plans for all specifications
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
221

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 119

8.11. PART 9 SIGNING AND STRIPING IMPROVEMENTS
900 TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS 900-1 REMOVAL OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.:

All conflicting striping, pavement markings, and curb paint shall be removed by wet sandblasting or other approved method prior to installation of new striping. All conflicting raised pavement markers shall be removed.

Pavement that is damaged due to removal of markers or striping shall be repaired to the satisfaction of the Agency Representative.

Removal of existing yellow painted striping throughout the project limits of University Drive shall comply with the requirements Caltrans Standard Special Provisions 14 -11.07 and 15 -2.02C(2), included as Appendix C herein these project specifications.

900-2 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.

The Contractor shall furnish and apply traffic stripes and pavement markings as shown on the Plans and as directed by the Agency's Representative. Placement of striping and markings shall conform to the requirements of Section 84 of the State Standa rd Specifications, latest edition, the City of Lake Forest Standard Plans and these Special Provisions.

Signing and striping shall conform to part 2 signs & part 3 markings of the (MUTCD), latest edition, these Plans and Special Provisions.

Detail 9 la ne line striping pattern in part 3 markings shall be used on all multilane streets regardless of street design speed.

Pavement legends shall match the City stencils (Hawkins stencils or equivalent).

All striping and pavement markings shall be reflectorized and applied in two coats. A minimum of seven days shall be provided between first and second coats.

The Contractor shall contact the City of Lake Forest inspection services for inspection 48 hours prior to beginning of construction.

Contractor shall verify all existing conditions and dimensions before starting work. If conditions exist which are contra ry to those shown on these Plans, the City of Lake Forest inspection services shall be notified before proceeding with work.

Striping shall be cat tracked and approved by the Agency Representative prior to final installation.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
222

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 120

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
223

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 121

9. SECTION 00900 PLANS AND SPECIFICATIONS

9.1. SEE ATTACHEMENTS FOR PLANS
See Attachments for Plans & Specifications
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
224

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 122

10. APPENDIX A INSURANCE REQUIREMENTS

10.1. WORKERS’ COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for Contractor ’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.

Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its officials, officers, employees, agents, and volunteers. Company or companies providing insurance coverage shall be acceptable to City, if in the form and coverage as set forth in the Contract Documents.

10.2. COMMERCIAL GENERAL LIABILITY INSURANCE

1. Contractor shall procure and maintain during the life of this Contract and for such other period as may be required herein, at its sole expense, occurrence form Commercial General Liability insurance coverage, at least as broad as the most current ISO CGL Form 00 01 including but not limited to, premises liability, contractual liability, products/completed operations if applicable, personal and advertising injury which may arise from or out of Contractor’s operations, use, and management of the Project site, or the performance of its obligations hereunder. Policy limits shall not be less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability, and a $2,000,000 completed operations aggregate. [**PLEASE NOTE THAT THIS

AMOUNT MAY NEED TO BE ADJUSTED UPWARD DEPENDING ON THE NATURE AND SCOPE OF THE WORK TO BE PERFORMED. INSURANCE COVERAGE SHOULD BE EVALUATED ON A CASE- BY-CASE BASIS. ALWAYS DELETE THIS BOX.**]Defense costs shall be paid in addition to the limits.

2. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess of such coverage, nor shall it limit Contractor’s indemnification obligations to City, and shall not preclude City from taking such other actions available to City under other provisions of the Contract Documents or law.

3. Contractor shall make certain that any and all subcontractors hired by Contractor are insured in accordance with this Contract. If any subcontractor’s coverage does not comply with the foregoing provisions, Contractor shall indemnify and hold City harmless from any damage, loss, cost, or expense, including attorneys’ fees, incurred by City as a result thereof.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
225

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 123

4. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.

5. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non-owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions, relating to liability for injury to or death of persons and damage to property. If the coverage contains one or more aggregate limits, a minimum of 50% of any such aggregate limit must remain available at all times; if over 50% of any aggregate limit has been paid or reserved, City may require additional coverage to be purchased by Contractor to restore the required limits. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents.

10.3. AUTOMOBILE LIABILITY INSURANCE
Contractor shall take out and maintain at all times during the term of this Contract Automobile Liability Insurance at least as broad as ISO CA 00 01 (Any Auto) covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under these Contract Documents, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. Such insurance shall be provided in a form and with insurance companies acceptable to City and comply with the provisions of Section 6 below.

10.4. UMBRELLA OR EXCESS LIABILITY INSURANCE.

Contractor shall obtain and maintain an umbrella or excess liability insurance policy with limits of not less than $4,000,000 that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability. Such policy or policies shall include the following terms and conditions:

1. A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;

2. Pay on behalf of wording as opposed to reimbursement;

3. Concurrency of effective dates with primary policies; and

4. Policies shall “follow form” to the underlying primary policies.

5. Insureds under primary policies shall also be insureds under the umbrella or excess policies.

10.5. BUILDER’S RISK [“ALL RISK”]
The City has obtained Builder’s Risk [“All Risk”] extended coverage insurance for the Project. Contractor shall NOT procure Builder’s Risk [“All Risk”] insurance for this Project, and shall NOT include the cost of said coverage in its bid price/ the Contract Price.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
226

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 124

10.6. FORM AND PROOF OF CARRIAGE OF INSURANCE

1. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by City’s Risk Manager. Carrier(s) shall have an A.M. Best rating of not less than an A-:VII.

2. Insurance deductibles or self-insured retentions must be declared by the Contractor, and such deductibles and retentions shall have the prior written consent from City. At the election of City the Contractor shall either 1) reduce or eliminate such deductibles or self-insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses.

3. Contractor shall cause its insurance carrier(s) to furnish City with either 1) a properly executed original Certificates(s) of Insurance and certified original copies of Endorsements effecting coverage as required herein, or 2) if requested to do so in writing by City’s Risk Manager, provide original Certified copies of policies including all Endorsements and all attachments thereto, showing such insurance is in full force and effect. All required policies of Commercial General Liability, Automobile Liability insurance shall be endorsed to name the City, its officials, officers, employees, agents and volunteers as additional insureds. For all policies of Commercial General Liability insurance, Contractor shall provide endorsements in the form of ISO CG 20 10 10 01 and 20 37 01 01 (or endorsements providing the exact same coverage) to effectuate this requirement. Further, all policies of insurance shall contain or shall be endorsed to contain the covenant of the insurance carrier(s) that shall provide no less than thirty (30) days written notice be given to City prior to any material modification or cancellation of such insurance.

4. In the event of a material modification or cancellation of coverage, City may terminate or Stop Work pursuant to the Contract Documents, unless City receives, prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original policies, including all endorsements and attachments thereto evidencing coverages set forth herein and the insurance required herein is in full force and effect.

Contractor shall not take possession, or use the Project site, or commence operations under these Contract Documents until City has been furnished original Certificate(s) of Insurance and certified original copies of Endorsements or policies of insurance including all Endorsements and any and all other attachments as required in this Section. The original Endorsements for each policy and the Certificate of Insurance shall be signed by an individual authorized by the insurance carrier to do so on its behalf.

5. All required insurance coverages shall contain or be endorsed to waive subrogation against the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its Subcontractors.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
227

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 125

6. It is understood and agreed to by the parties hereto and the insurance company(s), that the Certificate(s) of Insurance and policies shall so covenant and shall be construed as primary, and City’s insurance and/or deductibles and/or self-insured retentions or self-insured programs shall not be construed as contributory. The Contractor shall provide endorsement(s) to this effect at the City’s request.

7. City reserves the right to adjust the monetary limits of insurance coverage’s during the term of this Contract including any extension thereof-if in City’s reasonable judgment, the amount or type of insurance carried by the Contractor becomes inadequate.

8. In the event any policy of insurance required by the Contract Documents does not comply with these specifications or is canceled and not replaced immediately so as to avoid a lapse in the required coverage, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Contractor or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Contract, effective upon notice.

9. Contractor acknowledges and agrees that actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposed no additional obligation on the City nor does it waive any rights hereunder.

10. Requirement of specific coverage or limits contained in this section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance.

11. Contractor shall be responsible for causing all Subcontractors of any tier working under this Contract to purchase insurance meeting the requirements contained herein, including adding the City its officials, officers, employees, agents and volunteers as Additional Insureds to the subcontractor’s policies. All policies of Commercial General Liability insurance provided by Subcontractors shall be endorsed to name the City, its officials, officers, employees, agents and volunteers as additional insureds using endorsement form ISO GC 20 38 04 13 (or an endorsement providing the exact same coverage) to effectuate this requirement. Contractor shall not allow any Subcontractor to commence work relating to these Contract Documents until it has received satisfactory evidence of Subcontractor’s compliance with all insurance requirements under this Contract. The Contractor shall provide satisfactory evidence of compliance with this section upon request of the City.

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
228

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 126

11. PRICING PROPOSAL - BID LINE ITEMS
The undersigned, hereby declare that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all plans, specifications, and all addenda, if any, for the El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B)Project:

In case of discrepancy between the unit price and the item cost set forth for a unit basis item, the unit price shall prevail and, shall be utilized as the basis for determining the lowest responsive, responsible bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the “Item Cost” column, then the amount set forth in the “Item Cost” column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. If any of the above discrepancies exist, the City may recalculate the bid price on the basis of the unit price and the bidder agrees to be bound by such recalculation. Final payment shall be determined by the City from measured quantities of work performed based upon the unit price.

BASE BID SCHEDULE A: JERONIMO ROAD WIDENING IMPROVEMENTS Line Item Description Quantity Unit of
Measure
Unit Cost Total
A-1 Project Mobilization, Demobilization,
and Cleanup (Not to Exceed 5% of
Construction Costs)
1 LS
A-2 Construction Staking, Surveying &
Monument Preservation
1 LS
A-3 Traffic Control & Noticing 1 LS
A-4 SWPPP & Storm Water Protection 1 LS
A-5 Sawcut, Excavate & Dispose Ex.

AC/PCC Roadway, 2' x 10" Min.
955 SF
A-6 Remove & Dispose Ex. Concrete Curb
& Gutter
485 LF
A-7 Remove & Dispose Ex. Concrete Curb
Ramp
1 EA
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
229

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 127

Line Item Description Quantity Unit of
Measure
Unit Cost Total
A-8 Remove & Dispose Ex. Concrete
Sidewalk
3,655 SF
A-9 Remove & Dispose Ex. CMU
Retaining/Screen Wall & Associated
Footings
460 LF
A-10 Remove & Dispose Ex. Tree 10 EA
A-11 Remove/Relocate Ex. Sign & Post 1 EA
A-12 Grading & Earthwork 1 LS
A-13 Construct PCC Curb & Gutter, A2-8 440 LF
A-14 Remove Ex. & Construct New ADA
Compliant PCC Accessible Curb Ramp
1 EA
A-15 Construct ADA Accessible 4" PCC
Sidewalk
3,430 SF
A-16 Construct 10" CMB 285 TON
A-17 Construct 3-1/2" AC Pavement
Section
165 TON
A-18 Construct 0" To 2" Variable Depth AC
Cold Mill
6,290 SF
A-19 A-19 2" Uniform Depth AC Cold Mill 35,400 SF
A-20 Construct 2" ARHM Overlay 525 TON
A-21 Coordinate SCG Vault Relocation &
Prep Work Area
1 LS
A-22 Adjust Ex. SMWD Manhole Frame &
Cover to Grade
1 EA
A-23 Relocate Ex. SMWD Air Vac
Ornamental Pole
1 LS
A-24 Relocate IRWD Fire Hydrant Assembly 1 EA
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
230

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 128

Line Item Description Quantity Unit of
Measure
Unit Cost Total
A-25 Remove & Replace IRWD Water Valve
Frame & Cover to Grade
3 EA
A-26 Adjust Cathodic Protection Test
Station Frame & Cover to Grade
1 EA
A-27 Adjust Ex. Water Valve Frame & Cover
to Grade
2 EA
A-28 Construct CMU Retaining/Screen Wall 400 LF
A-29 Construct CMU Wall Standard Pilaster 7 EA
A-30 Construct CMU Wall Monument
Pilaster
2 EA
A-31 Remove & Reconstruct/Reconfigure
Steel Security Fencing & Gate.

Material, Color & Finish to Match
Existing
1 LS
A-32 Forest Glenn Hillside Stabilization and
Temporary Planting
1 LS
A-33 Remove & Replace "Forest Glen"
Monument sign, in Like Condition
1 LS
A-34 Traffic Signal Modifications 1 LS
A-35 Implement Signing & Striping 1 LS
A-36 Traffic Signal Interconnect
Improvements
1 LS
TOTAL

BASE BID SCHEDULE B: EL TORO ROAD MEDIAN IMPROVEMENTS
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
231

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 129

Line Item Description Quantity Unit of
Measure
Unit Cost Total
B-1 Project Mobilization, Demobilization,
& Cleanup (Not to Exceed 5% of
Construction Costs)
1 LS
B-2 Construction Staking & Surveying 1 LS
B-3 Traffic Control & Noticing 1 LS
B-4 SWPPP & Storm Water Protection 1 LS
B-5 Sawcut, Remove & Dispose Ex. PCC
Curb & Gutter, Sidewalk, & AC
Roadway Paving for El Toro Rd
Widening near Jeronimo Rd and
Median Construction (Unclassified
Excavation)
60 CY
B-6 4" Uniform Depth Cold Mill 488,450 SF
B-7 Construct 1.5" AC Leveling Course 4,580 TON
B-8 Construct 2.5" ARHM Overlay 7,640 TON
B-9 Local Digouts - 4" Thick (Sta. 104+00
to Jeronimo)
2,575 SF
B-10 Local Digouts - 12.5" Thick (Jeronimo
Rd to Toledo Way )
21,435 SF
B-11 Local Digouts - 14" Thick (Toledo Way
to Trabruco Rd)
39,900 SF
B-12 Added Cost for Disposing Pavement
Fabric (Estimated from Corings)
72,960 SF
B-13 Remove & Reconstruct 4" PCC
Sidewalk, Prune & Remove Conflicting
Roots, Coordinate with City Arborist
1,180 SF
B-14 Remove Ex. & Construct New ADA
Compliant PCC Accessible Curb Ramp
4 EA
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
232

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 130

Line Item Description Quantity Unit of
Measure
Unit Cost Total
B-15 Remove & Reconstruct 8" PCC Curb &
Gutter, A2-8
220 LF
B-16 Sawcut, Remove Ex. Curb and/or Curb
& Gutter, AC/PCC Roadway &
Construct New PCC Bus Pad &
Monolithic Curb & Gutter
10,780 SF
B-17 Fill Sidewalk Pothole with PCC, Flush
with Ex. Surface
4 EA
B-19 Construct 4.5" AC Pavement Base
Course
90 TON
B-20 Construct 10" CMB 150 TON
B-21 Remove & Relocate Ex. Pedestrian
Traffic Push Button to 3'-6" above
Grade
16 EA
B-22 Remove & Reconstruct PCC Driveway,
10% Max
200 SF
B-23 Remove & Reconstruct Private Curb &
Gutter
18 LF
B-24 Remove & Reconstruct Private AC
Pavement, in Kind
150 SF
B-25 Sawcut & Remove ex. AC Roadway
Section and Construct 8" PCC Median
Curb, Type A1-8
7,200 LF
B-26 Backfill, Grade, & Compact Median
Infill Area with Crushed Roadway
Spoils & CMB Import (+/- 4" Thick)
10,700 SF
B-27 Additional Sawcut & Roadway Section
Removal Within Median Planting Area
11,000 SF
B-28 Trench & Extend Water & Low
Voltage to Median
2 EA
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
233

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 131

Line Item Description Quantity Unit of
Measure
Unit Cost Total
B-29 Trench & Install Irrigation & Low
Voltage Sleeves Across Intersections
200 LF
B-30 Import soil for Planting Area 190 CY
B-31 Install Median Cobble Paving 10,700 SF
B-32 Install Irrigation System 1 LS
B-33 Landscape Grading & Planting 1 LS
B-34 Remove & Replace Ex. IRWD Domestic
or Reclaimed Water Valve Frame &
Cover to Grade
31 EA
B-35 El Toro & Toledo Video Detection
Signal Upgrade
1 LS
B-36 El Toro & Serrano Video Detection
Signal Upgrade
1 LS
B-37 El Toro & Trabuco Video Detection
Signal Upgrade
1 LS
B-38 Remove & Replace Traffic Loop
Detector
22 EA
B-39 Implement Signing & Striping Plans 1 LS
B-40 90 Day Landscape Establishment
Period
1 LS
TOTAL

BASE BID SCHEDULE C: TRABUCO ROAD MEDIAN IMPROVEMENTS
Line Item Description Quantity Unit of
Measure
Unit Cost Total
C-1 Project Mobilization, Demobilization,
and Cleanup (Not to Exceed 5% of
Construction Costs)
1 LS
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
234

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 132

Line Item Description Quantity Unit of
Measure
Unit Cost Total
C-2 Construction Staking & Surveying 1 LS
C-3 Traffic Control & Noticing 1 LS
C-4 SWPPP & Storm Water Protection 1 LS
C-5 Sawcut, Excavate & Dispose Ex.

AC/PCC Roadway for Median
Construction
30 CY
C-6 4" Uniform Depth Cold Mill 25,000 SF
C-7 Construct 1.5" AC Leveling Course 240 TON
C-8 Construct 2.5" ARHM Overlay 390 TON
C-9 Construct 8" PCC Median Curb, A1-8 70 LF
C-11 Install Variable Depth AC Leveling
Course, 2.5" Max
390 TON
C-12 Construct 12-18" Wide Monolithic
Curb
250 LF
C-13 Remove & Replace Traffic Loop
Detector
10 EA
C-14 Implement Signing & Striping Plans 1 LS
TOTAL

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
235

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 133

12. VENDOR REQUIRED FORMS

12.1. Bid Form*
The undersigned, hereby declare that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all plans, specifications, and all addenda, if any, for the following Project:
• TEMPLATE_Bid_Form_Section_0...
• TEMPLATE_Bid_Form_Section_0...
*Response required

12.2. Contractor’s Certificate Regarding Workers’ Compensation* Please download the below documents, complete, and upload:
"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract."
• Contractors_Certificate_Reg...
*Response required

12.3. Bid Bond*
Please download the below documents, complete, and upload. • TEMPLATE_Bid_Bond_Section_0...
*Response required

12.4. Noncollusion Declaration*
Please download the below documents, complete, and upload. • Noncollusion_Declaration_Se...
*Response required

12.5. Contractor Information and Experience Form*
Please download the below documents, complete, sign, scan, and upload. Incomplete forms without appropriate signatures will not be accepted and will result in incomplete bid. • TEMPLATE_Contractor_Informa...
• Contractor_Information_and_...
*Response required
Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
236

Request for Bids (RFB) #2025-RFB-108
Title: El Toro Road Corridor Improvements - A: JERONIMO ROAD WIDENING PROJECT (PW 2019-08) B: EL TORO ROAD MEDIAN IMPROVEMENTS (2020-07) C: TRABUCO ROAD MEDIAN IMPROVEMENTS (24S09B) 134

12.6. List of Subcontractors Form*
Please download the below documents, complete, sign, scan, and upload. Incomplete forms without appropriate signatures will not be accepted and will result in incomplete bid. • TEMPLATE_List_of_Subcontrac...
• TEMPLATE_List_of_Subcontrac...
*Response required

12.7. Iran Contracting Act Certification*
Please download the below documents, complete, sign, scan, and upload. Incomplete forms without appropriate signatures will not be accepted and will result in incomplete bid. • Iran_Contracting_Act_Certif...
*Response required

12.8. Public Works Contractor Registration Certification* Please download the below documents, complete, sign, scan, and upload. Incomplete forms without appropriate signatures will not be accepted and will result in incomplete bid. • Public_Works_Contractor_Reg...
*Response required

Docusign Envelope ID: FB56B973-BBF2-48C2-92B7-7F43844F7D45 Item: 9
237

ATTACHMENT 4
Item: 9
238

701 N. Parkcenter Drive
Santa Ana, CA 92705
p: 714/560/8200 f: 714/560/8211
www.tait.com
Since 1964
Los Angeles
Ontario
Sacramento
San Diego
San Francisco
Boise
Dallas
Denver
Phoenix
Portland
701 N. Parkcenter Drive
Santa Ana, CA 92705
p: 714/560/8200 f: 714/560/8211
www.tait.com
Since 1964
Los Angeles
Ontario
Sacramento
San Diego
San Francisco
Boise
Dallas
Denver
Phoenix
Portland OF 11
GENERAL NOTES:

1.ALL WORK SHALL CONFORM TO THESE IMPROVEMENT PLANS. THE PROJECT

SPECIFICATIONS, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (SPPWC) "GREEN BOOK" AND CALTRANS

STANDARDS, IN THE EVENT OF A CONFLICT THE MOST STRINGENT STANDARD SHALL PREVAIL.

2.APPROVAL OF THESE PLANS BY THE CITY OR ITS AGENTS DOES NOT RELIEVE THE

CONTRACTOR FROM THE RESPONSIBILITY FOR THE CORRECTIONS OF ERRORS OR OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL APPROPRIATE PLAN

REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR THE

REVIEW AND APPROVAL PRIOR TO CONTINUANCE OF THE AFFECTED IMPROVEMENTS.

3.NO DEVIATION FROM THESE PLANS SHALL BE MADE UNLESS A CHANGE ORDER IS

APPROVED BY THE CITY ENGINEER AND NOTED IN THE REVISION BLOCK OF EACH SHEET WHERE SUCH APPROVAL HAS BEEN GIVEN. THE CONTRACTOR SHALL

OBTAIN AN ENCROACHMENT PERMIT FOR WORK WITHIN THE PUBLIC WAY PRIOR TO THE START OF AN CONSTRUCTION.

4.CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE DIVISIONS OF INDUSTRIAL REGULATIONS (CAL-OSHA) SAFETY STANDARDS. IF REQUIRED BY THE INSPECTOR, THE CONTRACTORS SHALL PROVIDE PROOF OF A PERMIT FROM SAID DIVISION.

5.CONTRACTORS SHALL NOTIFY THE CITY PUBLIC WORKS INSPECTOR 48 HOURS PRIOR TO COMMENCING CONSTRUCTION AND 24 HOURS IN ADVANCE OF SPECIFIC INSPECTION NEEDS DURING THE COURSE OF THE WORK.

6.ALL WORK SHALL BE PERFORMED DURING CITY WORKING HOURS AND WILL BE SUBJECT TO INSPECTION BY THE PUBLIC WORKS DEPARTMENT. WHERE OVERTIME

INSPECTION IS NEEDED, SUBJECT TO THE AVAILABILITY OF AN INSPECTOR AND

APPROVED BY THE CITY ENGINEER, THE CONTRACTORS WILL BE BILLED FOR SAID INSPECTION SERVICES.

7.CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL

REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OR CONTINUANCE OF WORK.

8.CONTRACTORS SHALL LOCATE, PROTECT, AND SAVE ANY AND ALL SURVEY

MONUMENTS THAT WILL BE OR MAY BE DAMAGED OR DESTROYED BY THESE OPERATIONS. ONCE FOUND, THE CONTRACTOR SHALL THEN NOTIFY BOTH THE CITY AND ENGINEER OF RECORD. THE SUPERVISING CIVIL ENGINEER OR HIS

LICENSED SURVEYOR DESIGNEE SHALL RESET ALL SAID MONUMENTS PER THE REQUIREMENTS OF THE PROFESSIONAL LAND SURVEYORS' ACT.

9.UTILITY LOCATION AND DEPTHS SHOWN HEREON HAVE BEEN PLOTTED IN ACCORDANCE WITH DATA FURNISHED BY THE UTILITY COMPANIES. NEITHER THE

CITY NOR THE ENGINEER ASSUMES RESPONSIBILITY FOR THE ACCURACY OF THE INFORMATION RECEIVED FROM EACH COMPANY. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS. ALL COSTS FOR PROTECTING,

REMOVING, AND RESTORING EXISTING IMPROVEMENTS SHALL BE BORNE BY THE CONTRACTOR.

10.EXISTING TRAFFIC SIGNS ARE NOT TO BE REMOVED WITHOUT PRIOR

NOTIFICATION AND APPROVAL OF THE CITY ENGINEER, TRAFFIC CONTROL PLANS

SHALL CONFORM TO THE REQUIREMENTS OF THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD). A TRAFFIC CONTROL PLAN MUST BE SUBMITTED TO THE CITY ENGINEER 20 DAYS PRIOR TO IMPLEMENTATION OF THE TRAFFIC CONTROL. THE CITY ENGINEER'S

WRITTEN APPROVAL MUST BE OBTAINED PRIOR TO IMPLEMENTATION OF THE TRAFFIC CONTROL.

11.DUST CONTROL SHALL BE MAINTAINED AT ALL TIMES. EROSION CONTROL

MEASURES SHALL BE PROVIDED FOR ALL WORK IN CONFORMANCE WITH NPDES REQUIREMENTS.

12.ALL UNDERGROUND UTILITIES AND SERVICE LATERALS SHALL BE INSTALLED PRIOR TO CONSTRUCTING CURBS - GUTTERS, SIDEWALKS, AND PAVING.

13.THE STRUCTURAL SECTIONS HAVE BEEN ESTABLISHED BY THE GEOTECHNICAL/SOILS ENGINEER. ALL AGGREGATE BASE, ASPHALT, AND

CONCRETE MIX DESIGNS SHALL BE SUBMITTED FOR THE CITY ENGINEER'S APPROVAL NO LESS THAN 20 DAYS PRIOR TO THE INSTALLATION OF MATERIAL.

14.AGGREGATE BASE SHALL BE CRUSHED AGGREGATE BASE OR CRUSHED MISCELLANEOUS BASE PER SPPWC. BASE PLACEMENT SHALL NOT COMMENCE

UNTIL OBTAINING CITY ENGINEERS APPROVAL OF COMPACTION REPORT WITH ALL OTHER APPROPRIATE TEST RESULTS (E.G. SIEVE ANALYSIS, SAND EQUIVALENT, R-VALUE) PREPARED BY THE GEOTECHNICAL ENGINEER.

15.ABOVE GROUND STRUCTURES IN THE SIDEWALK, INCLUDING, BUT NOT LIMITED

TO, FACULTIES OWNED BY THE CITY, ANY UTILITY COMPANY OR DISTRICT, AND THE U.S. POSTAL SERVICE SHALL BE CONSISTENT WITH MINIMUM REQUIREMENTS FOR HANDICAP ACCESS. THE TOP OF CURB WIDTH SHALL NOT BE INCLUDED WHEN MEASURING SIDEWALK WIDTH.

16.TRAFFIC SIGNS AND STRIPING SHALL BE INSTALLED BY THE CONTRACTOR IN

ACCORDANCE WITH THE CA MUTCD, APPROVED PLANS, AND TO THE SATISFACTION OF THE CITY ENGINEER.

17.PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL JOIN CONDITIONS FOR GRADING AND DRAINAGE WORK. IF CONDITIONS DIFFER

FROM THOSE SHOWN ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE

ENGINEER AND SHALL NOT BEGIN CONSTRUCTION UNTIL THE CHANGED CONDITIONS HAVE BEEN EVALUATED.

18.THE EXISTENCE, LOCATION AND CHARACTERISTICS OF UNDERGROUND UTILITY

INFORMATION SHOWN ON THESE PLANS HAVE BEEN OBTAINED FROM A REVIEW OF AVAILABLE RECORD DATA.

19.THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR

JOB SITE CONDITIONS, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT. THIS REQUIREMENT

SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER

AND ENGINEER HARMLESS FORM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT.

20.THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE PLANS, THE SOILS

AND/OR GEOLOGY REPORTS, AND THE SITE CONDITIONS PRIOR TO COMMENCING WORK.

21.SHOULD CONFLICTING INFORMATION BE FOUND ON THE PLANS, THE

CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER BEFORE PROCEEDING WITH THE WORK IN QUESTION.

22.THE CONTRACTOR SHALL OBTAIN AN O.S.H.A. PERMIT FORM THE CALIFORNIA DIVISION OF INDUSTRIAL. SAFETY PRIOR TO THE CONSTRUCTION TRENCHES OR EXCAVATIONS WHICH ARE 5 FEET OR DEEPER.

23.CONTRACTOR SHALL COMPLY WITH THE "CALIFORNIA STORM WATER BEST MANAGEMENT PRACTICE HANDBOOK."

24.THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER A MINIMUM OF 48 HOURS IN

ADVANCE TO REQUEST A PRE-CONSTRUCTION MEETING TO DISCUSS THE CITY'S CONSTRUCTION POLICIES AND PROCEDURES. THIS MEETING SHALL BE ATTENDED BY THE CONTRACTOR PROJECT CIVIL AND GEOTECHNICAL ENGINEERS.

25.THE CONTRACTOR SHALL PROTECT ALL EXISTING PROPERTIES FROM DAMAGE IN ACCORDANCE WITH SECTION 7-1.11 SPPWC. ACCESS TO PROPERTIES ADJACENT TO ALL AREAS OF WORK SHALL BE MAINTAINED AT ALL TIMES.

26.ALL PAVEMENT JOIN LINES SHALL BE SAW-CUT IN STRAIGHT LINES EITHER

PARALLEL TO THE CURB OR AT RIGHT ANGLES TO THE ALIGNMENT OF THE STREET CENTERLINE.

27.A.C. PAVEMENT LONGITUDINAL JOIN LINES SHALL BE CONSTRUCTED AT THE EDGES OF TRAFFIC LANES. JOINS WILL NOT BE PERMITTED UNDER THE WHEEL PATHS OF VEHICLES.

28.A TACK COAST SHALL BE APPLIED AT ALL SAW-CUT AND JOIN LINES UNDER THE A.C. OVERLAYS AS SPECIFIED IN SECTION 39-402 OF THE STANDARD SPECIFICATIONS.

29.RESET SEWER MANHOLES, STORM DRAIN MANHOLES, WATER VALVES PER THE

STANDARDS OF THE RESPECTIVE UTILITY AGENCY AT THE END TO THE FINISHED GRADE OF THE PAVEMENT. GAS VALVE SLIP CANS AND LIDS SHALL BE ADJUSTED TO GRADE DURING THE PAVING OPERATIONS.

30.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (USA) TOLL FREE AT 1-800-227-2800, AT LEAST 48 HOURS PRIOR TO ANY WORK.

31.THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL NECESSARY CONSTRUCTION SURVEYING NECESSARY TO COMPLETE THE WORK.

32.UNLESS NOTED OTHERWISE, STATIONING ON PLANS ARE CENTERLINE STATIONING, AND ARE PROVIDED FOR REFERENCE PURPOSES ONLY.

33.THE BACKFILLING OF ALL TRENCHES SHALL BE TESTED AND MEET THE APPROVAL OF THE GEOTECHNICAL ENGINEER. BACKFILLING SHALL MEET THE REQUIREMENTS OF SSPWC.

34.ALL CONCRETE SIDEWALKS OR CURBS THAT ARE DAMAGED OR NOT

CONSTRUCTED TO LINE AND GRADE SHALL BE SAW-CUT TO THE NEAREST

TRANSVERSE SCORE MARK OR ADJUSTABLE CONTROL JOINT OR WEAKENED PLANE JOINT. REMOVED AND REPLACED IN CONFORMANCE WITH THE APPLICABLE PROVISIONS OF SPPWC STANDARD PLANS. CURB AND GUTTER, SIDEWALK AND

ALL OTHER VISIBLE CONCRETE WITHIN THE STREET SHALL BE CONSIDERED DAMAGED AND DEFECTIVE IF ANY OF THE FOLLOWING DEFECTS ARE NOTED: TWO OR MORE PITS GREATER THAN 1/4" IN DIAMETER, SCRAPES OR GOUGES DEEPER THAN 1/2" IN DEPTH OR 4" IN LENGTH WITH ANY FIVE FOOT LONG SECTION OR DEVIATION FROM LINE OR GRADE OF MORE THAN 1/8" WITHIN 10 FEET.

35.THE CONTRACTOR SHALL MAINTAIN ALL ADJACENT STREETS IN A NEAT, CLEAN,

DUST FREE AND SANITARY CONDITION AT ALL TIMES AND TO THE SATISFACTION OF THE CITY ENGINEER. THE ADJACENT STREETS SHALL BE KEPT CLEAN OF DEBRIS, CONTROLLING DUST AND OTHER NUISANCES AT ALL TIMES.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEAN UP ON ADJACENT STREETS AFFECTED BY THE CONSTRUCTION.

36.IRWD FACILITIES SHALL BE INSTALLED OR ADJUSTED PER IRWD STANDARD DRAWINGS AND CONSTRUCTION MANUAL & PROCEDURE GUIDELINES.

37.CONTRACTOR SHALL SUBMIT AND OBTAIN A SMWD ENCROACHMENT PERMIT ($320 FEE) TO PERFORM THE AIR/VAC ORNAMENTAL POLE RELOCATION.

CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO, OR USES OF THESE PLANS. ALL

CHANGES TO THE PLANS MUST BE IN WRITING, AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.

THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY FACILITIES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS.

THE LOCATIONS SHOWN ARE APPROXIMATE AND SHALL BE CONFIRMED IN THE FIELD BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

MAKING ANY NECESSARY ADJUSTMENTS TO ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENTS. THE CONTRACTOR IS REQUIRED TO TAKE DUE

PRECAUTIONARY MEASURES TO PREVENT DAMAGE TO ANY UTILITY FACILITIES SHOWN AND ANY OTHER FACILITIES NOT SHOWN ON THESE PLANS.

ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON THESE

PLANS AGREE THAT, IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION

PRACTICES, THEY WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE

RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT. THIS INCLUDES PROVIDING FOR THE SAFETY OF

ALL PERSONS AND PROPERTY AND SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTORS AND

SUBCONTRACTORS FURTHER AGREE TO DEFEND, INDEMNIFY AND HOLD HARMLESS

THE DESIGN PROFESSIONAL FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN

CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE DESIGN PROFESSIONAL.

NOTICE TO CONTRACTOR:

CITY OF LAKE FOREST

DEPARTMENT OF PUBLIC WORKS

JERONIMO ROAD WIDENING IMPROVEMENT PROJECT
CITY PROJECT NO. PW2019-08
IRWD CODE 8258

LOCATION MAP
N.T.S.

LENGTH AND WIDTH

LOW POINT

LANDSCAPING

MINIMUM

OVERHEAD WIRES

PLANTER AREA

PORTLAND CEMENT CONCRETE

PROPERTY LINE

POINT OF BEGINNING

POWER POLE

POLYVINYL CHLORIDE PIPE
RADIUS

RECLAIMED WATER

RIGHT-OF-WAY

REINFORCED CONCRETE PIPE

SANTA MARGARITA WATER DISTRICT

STORM DRAIN MAN-HOLE

STANDARD DUTY PAVEMENT

SEWER MAN-HOLE

STANDARD

SIDE WALK

TEMPORARY CONSTRUCTION EASEMENT

TOP OF CURB

TOP OF FOOTING

TOP OF GRATE

TRANSITION

TRANSITION STRUCTURE

TRAFFIC SIGNAL POLE

TRAFFIC SIGNAL PULL BOX

TOP OF WALL

TYPICAL

UNDERGROUND

VITRIFIED CLAY PIPE

WHEEL CHAIR RAMP

WATER VALVE
L&W
LP
LS
MIN
OHW
PA
PCC
⅊
POB
PP
PVC
R
RW
R/W
RCP
SMWD
SDMH
SDP
SMH
STD
SW
TCE
TC
TF
TG
TRANS
TS
TSP
TSPB
TW
TYP
UG
VCP
WCR
WV

AGGREGATE BASE

ASPHALT CONCRETE

ASPHALT RUBBER HOT MIX

AMERICAN WATER WORKS ASSOCIATION

BEGINNING CURB RETURN

BENCH MARK

BACK OF WALK

CENTER LINE

CURB AND GUTTER

CABLE TELEVISION PULL BOX

CATCH BASIN

CURB FACE

CRUSHED MISCELLANEOUS BASE

CEMENT MORTAR LINED & COATED PIPE

CLEAN-OUT

DOUBLE DETECTOR CHECK VALVE

DROP INLET

DOMESTIC WATER

END CURB RETURN

ELEVATION

EDGE OF PAVEMENT

ELECTRIC VAULT WITH TRANSFORMER

EXISTING

FINISH FLOOR ELEVATION

FLOW LINE
FENCE

FIRE PROTECTION WATER

FINISHED SURFACE

HEAVY DUTY PAVEMENT

HIGH POINT

INVERT ELEVATION

JUNCTION BOX

LOCAL DEPRESSION

MAN HOLE
A.B.

A.C.

ARHM
AWWA
BCR
BM
BW
℄
C&G
CATVPB
CB
CF
CMB
CMLC
CO
DDVC
DI
DW
ECR
EL
EP
EVT
EX.

FFE
FL
FNC
FPW
FS
HDP
HP
INV
JB
LD
MH
LEGEND

PROPOSED UTILITY ADJUSTMENT

EXISTING UTILITY FEATURE

EXISTING SIGN

EXISTING FIRE HYDRANT

CENTERLINE

EXISTING LIGHT POLE

PROPERTY LINE/RIGHT-OF-WAY

PROPOSED CURB & GUTTER

EXISTING METER BOX

EXISTING CURB & GUTTER

STANDARD ABBREVIATIONS

TITLE SHEET
1 DATUM STATEMENT

BASIS OF BEARING
”
SIGNING & STRIPING GENERAL NOTES:

1.CONTRACTOR SHALL INSTALL SIGNING AND STRIPING IN ACCORDANCE WITH THE APPROVED PLAN.

2.TRAFFIC STRIPES, PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS SHALL BE

MANUFACTURED AND INSTALLED PER CALTRANS PUBLICATION CA-MUTCD LATEST

REVISION, CALTRANS STANDARD PLANS AND CALTRANS STANDARD SPECIFICATIONS, LATEST EDITIONS.

3.ALL SIGNS SHALL BE STANDARD SIZE UNLESS OTHERWISE NOTED ON PLANS. SIGNS

SHALL BE INSTALLED ON SQUARE PERFORATED STEEL TUBE POSTS WITH BREAKAWAY BASES PER SP 1417, UNLESS OTHERWISE NOTED ON THE PLAN.

4.ALL STRIPES, SIGNS AND PAVEMENT MARKINGS SHALL BE REFLECTORIZED.

5.STENCILS FOR PAVEMENT MARKINGS SHALL MATCH ORANGE COUNTY STANDARD STENCILS EXACTLY. ALL STRIPING AND MARKING DETAILS SHALL MATCH CALTRANS STANDARD PLAN DETAILS.

6.ALL CONFLICTING STRIPES AND PAVEMENT MARKINGS SHALL BE REMOVED BY SANDBLASTING. CONFLICTING SIGNS AND RAISED PAVEMENT MARKERS SHALL BE REMOVED. ALL REMOVALS OF SIGNS AND MARKINGS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/CONTRACTOR.

7.NEW APPLICATIONS OF PAINT SHALL BE APPLIED IN TWO (2) EQUAL THICKNESS

TOTALING THE MINIMUM WET THICKNESS INDICATED IN STANDARD SPECIFICATION SECTION 310-5.6.5, "TRAFFIC STRIPES AND MARKINGS", AND SHALL INCLUDE 50% OF

THE REQUIRED BEADS WITH EACH APPLICATION WHEN APPLIED TO NEW ASPHALT

PAVEMENT, PAINT SHALL HAVE A MINIMUM SEVEN DAY PERIOD BETWEEN APPLICATIONS UNLESS OTHERWISE DIRECTED BY THE ENGINEER.

8.ALL REMOVED SIGNS SHALL BE SALVAGED AND DELIVERED TO THE CITY YARD AS DIRECTED BY THE CITY INSPECTOR ON THE JOB SITE.

9.RAISED PAVEMENT MARKERS SHALL BE FURNISHED AND INSTALLED BY THE

CONTRACTOR IN ACCORDANCE WITH THE STRIPING DETAILS SHOWN ON THE SIGNING AND STRIPING PLAN. INSTALLATION SHALL BE COMPLETED WITHIN SEVEN WORKING DAYS OF ROADWAY STRIPING.

10.ALL WORK SHALL BE IN ACCORDANCE WITH THE MUNICIPAL CODE ADOPTED BY THE CITY OF LAKE FOREST AND ANY SPECIAL REQUIREMENTS OF THE PERMIT.

11.THE DEVELOPER/CONTRACTOR SHALL KEEP A COPY OF THE CURRENT ORANGE

COUNTY PUBLIC FACILITY & RESOURCES DEPARTMENT (PF&RD) STANDARD PLANS ON THE CONSTRUCTION SITE AT ALL TIMES.

12.THE DEVELOPER/CONTRACTOR SHALL NOTIFY THE CITY OF LAKE FOREST'S PUBLIC WORKS INSPECTOR AT (949) 461-3494 AT LEAST TWO WORKING DAYS (MINIMUM OF 48

HOURS) PRIOR TO STARTING CONSTRUCTION WORK WHICH REQUIRES PUBLIC WORKS INSPECTION.

13.A CITY OF LAKE FOREST ENCROACHMENT PERMIT SHALL BE REQUIRED TO PERFORM WORK WITHIN THE PUBLIC RIGHT-OF-WAY. CITY APPROVED PLANS DO NOT RELIEVE

THE CONTRACTOR AND/OR DEVELOPER FROM RESPONSIBILITY TO OBTAIN AN ENCROACHMENT PERMIT. A COPY OF THE PERMIT SHALL BE KEPT ON THE CONSTRUCTION SITE AT ALL TIMES.

14.THE DEVELOPER/CONTRACTOR SHALL MAINTAIN ADJACENT STREETS IN A NEAT,

CLEAN, DUST FREE AND SANITARY CONDITION AT ALL TIMES AND TO THE SATISFACTION OF CITY'S INSPECTOR. THE ADJACENT STREETS SHALL BE KEPT CLEAN OF DEBRIS, WITH DUST AND OTHER NUISANCE BEING CONTROLLED AT ALL TIMES.

DEVELOPER SHALL BE RESPONSIBLE FOR ANY CLEAN UP ON ADJACENT STREETS AFFECTED BY HIS CONSTRUCTION. METHOD OF STREET CLEANING SHALL BE BY DRY SWEEPING OF ALL PAVED AREAS. NO STOCKPILING OF BUILDING MATERIALS WILL BE

ALLOWED WITHIN THE PUBLIC RIGHT-OF-WAY WITHOUT THE PERMISSION OF CITY'S PUBLIC WORKS INSPECTOR.

15.PRIOR TO FINAL ACCEPTANCE OF STREET IMPROVEMENTS, ALL STREET PAVEMENT,

STRIPING AND PAVEMENT MARKINGS WITHIN THE PERIMETER OF THE CONSTRUCTION

PROJECT WILL BE RESTORED TO A LIKE NEW CONDITION, AND IN A MANNER MEETING

THE APPROVAL OF THE DIRECTOR OF PUBLIC WORKS/CITY ENGINEER OR HIS AUTHORIZED REPRESENTATIVE. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH COUNTY OF ORANGE STANDARD PLAN NO. 1801, NOTE 17.

16.SHARROWS SHALL BE INSTALLED 5 FEET, MINIMUM FROM NEAREST CURB FACE.

GENERAL TRAFFIC SIGNAL NOTES:

1.ALL ELECTRICAL WORK AND EQUIPMENT SHALL CONFORM TO THE LATEST REVISION OF

THE STATE OF CALIFORNIA STANDARD PLANS AND SPECIFICATIONS, AND THE CURRENT EDITION OF THE CALIFORNIA M.U.T.C.D.

2.CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDELINE ONLY. IT SHALL BE

THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATION.

3.UNLESS SHOWN OTHERWISE, INDUCTIVE LOOPS SHALL BE 6' DIAMETER, TYPE E, WITH 10' SPACING. NECESSARY STRIPING SHALL BE LOCATED PRIOR TO POSITIONING DETECTORS.

4.ALL NEW SIGNAL CONDUIT CROSSINGS SHALL BE 4" AND INSTALLED AT 42" MINIMUM DEPTH, UNLESS SHOWN OTHERWISE. NEW INTERCONNECT CONDUIT, OTHER THAN CROSSINGS SHALL BE 3" AND PLACED IN THE OPPOSITE ENDS OF PULL BOXES USING 45 DEGREE U.L. APPROVED ELBOWS.

5.CONTRACTOR SHALL EXERCISE EXTREME CARE TO AVOID DAMAGING EXISTING UTILITIES.

6.NEW PEDESTRIAN INDICATIONS SHALL BE L.E.D. COUNT-DOWN.

7.ALL NEW VEHICLE INDICATIONS SHALL BE L.E.D. INDICATIONS, IN METAL HOUSINGS.

8.ALL NEW PULL BOXES SHALL BE #6 WITH LIGHTWEIGHT LID UNLESS SHOWN OTHERWISE.

9.FURNISH AND INSTALL IISNS PER POLE SCHEDULE. THE CITY SHALL APPROVE THE SIGN PANEL SUBMITTAL PRIOR TO MANUFACTURING.

UTILITY CONTACT
4/17/25
4/24/2025
Item: 9
239

701 N. Parkcenter Drive
Santa Ana, CA 92705
p: 714/560/8200 f: 714/560/8211
www.tait.com
Since 1964
Los Angeles
Ontario
Sacramento
San Diego
San Francisco
Boise
Dallas
Denver
Phoenix
Portland
701 N. Parkcenter Drive
Santa Ana, CA 92705
p: 714/560/8200 f: 714/560/8211
www.tait.com
Since 1964
Los Angeles
Ontario
Sacramento
San Diego
San Francisco
Boise
Dallas
Denver
Phoenix
Portland OF 8

CITY OF LAKE FOREST

DEPARTMENT OF PUBLIC WORKS

EL TORO ROAD MEDIAN IMPROVEMENT PROJECT

FROM JERONIMO ROAD TO TRABUCO ROAD
CITY PROJECT NO. PW2020-07

EL TORO ROAD

SHEET INDEX MAP
1 VICINITY MAP
N
EL TORO RD.

LAKE FOREST DR.

BAKE PKWY.

LOS ALISOS BLVD.

MARGUERITE PKWY.

ALICIA PKWY.

EL TORO RD.

I-5 FWY
JERONIMO RD.

TRABUCO RD.

CALIFORNIA 241

SANTA MARGARITA

PORTOLA
PHASE 2
REHAB

PROJECT
PHASE 3
REHAB

PROJECT

MEDIAN PROJECT
PHASE 1
REHAB

PROJECT
N

SHEET INDEX

UTILITY CONTACT
SHEET 4 SHEET 3
GENERAL TRAFFIC SIGNAL NOTES:

1.ALL ELECTRICAL WORK AND EQUIPMENT SHALL CONFORM TO THE LATEST REVISION OF THE STATE OF CALIFORNIA STANDARD PLANS AND SPECIFICATIONS, AND THE CURRENT EDITION OF THE CALIFORNIA M.U.T.C.D.

2.CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDELINE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATION.

3.UNLESS SHOWN OTHERWISE, INDUCTIVE LOOPS SHALL BE 6' DIAMETER, TYPE E, WITH 10' SPACING. NECESSARY STRIPING SHALL BE LOCATED PRIOR TO POSITIONING DETECTORS.

4.ALL NEW SIGNAL CONDUIT CROSSINGS SHALL BE 4" AND INSTALLED AT 42" MINIMUM DEPTH, UNLESS SHOWN OTHERWISE. NEW INTERCONNECT CONDUIT, OTHER THAN CROSSINGS SHALL BE 3" AND PLACED IN THE OPPOSITE ENDS OF PULL BOXES USING 45 DEGREE U.L. APPROVED ELBOWS.

5.CONTRACTOR SHALL EXERCISE EXTREME CARE TO AVOID DAMAGING EXISTING UTILITIES.

6.NEW PEDESTRIAN INDICATIONS SHALL BE L.E.D. COUNT-DOWN.

7.ALL NEW VEHICLE INDICATIONS SHALL BE L.E.D. INDICATIONS, IN METAL HOUSINGS.

8.ALL NEW PULL BOXES SHALL BE #6 WITH LIGHTWEIGHT LID UNLESS SHOWN OTHERWISE.

9.FURNISH AND INSTALL IISNS PER POLE SCHEDULE. THE CITY SHALL APPROVE THE SIGN PANEL SUBMITTAL PRIOR TO MANUFACTURING.

GENERAL NOTES:

29.RESET SEWER MANHOLES, STORM DRAIN MANHOLES, WATER VALVES PER THE

STANDARDS OF THE RESPECTIVE UTILITY AGENCY AT THE END TO THE FINISHED GRADE OF THE PAVEMENT. GAS VALVE SLIP CANS AND LIDS SHALL BE ADJUSTED TO GRADE DURING THE PAVING OPERATIONS.

30.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (USA) TOLL FREE AT 1-800-227-2800, AT LEAST 48 HOURS PRIOR TO ANY WORK.

31.THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL NECESSARY CONSTRUCTION SURVEYING NECESSARY TO COMPLETE THE WORK.

32.UNLESS NOTED OTHERWISE, STATIONING ON PLANS ARE CENTERLINE STATIONING, AND ARE PROVIDED FOR REFERENCE PURPOSES ONLY.

33.THE BACKFILLING OF ALL TRENCHES SHALL BE TESTED AND MEET THE APPROVAL OF THE GEOTECHNICAL ENGINEER. BACKFILLING SHALL MEET THE REQUIREMENTS OF SSPWC.

34.ALL CONCRETE SIDEWALKS OR CURBS THAT ARE DAMAGED OR NOT

CONSTRUCTED TO LINE AND GRADE SHALL BE SAW-CUT TO THE NEAREST

TRANSVERSE SCORE MARK OR ADJUSTABLE CONTROL JOINT OR WEAKENED PLANE JOINT. REMOVED AND REPLACED IN CONFORMANCE WITH THE APPLICABLE PROVISIONS OF SPPWC STANDARD PLANS. CURB AND GUTTER, SIDEWALK AND

ALL OTHER VISIBLE CONCRETE WITHIN THE STREET SHALL BE CONSIDERED DAMAGED AND DEFECTIVE IF ANY OF THE FOLLOWING DEFECTS ARE NOTED: TWO OR MORE PITS GREATER THAN 1/4" IN DIAMETER, SCRAPES OR GOUGES DEEPER THAN 1/2" IN DEPTH OR 4" IN LENGTH WITH ANY FIVE FOOT LONG SECTION OR DEVIATION FROM LINE OR GRADE OF MORE THAN 1/8" WITHIN 10 FEET.

35.THE CONTRACTOR SHALL MAINTAIN ALL ADJACENT STREETS IN A NEAT, CLEAN,

DUST FREE AND SANITARY CONDITION AT ALL TIMES AND TO THE SATISFACTION OF THE CITY ENGINEER. THE ADJACENT STREETS SHALL BE KEPT CLEAN OF DEBRIS, CONTROLLING DUST AND OTHER NUISANCES AT ALL TIMES.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEAN UP ON ADJACENT STREETS AFFECTED BY THE CONSTRUCTION.

36.IRWD FACILITIES SHALL BE INSTALLED OR ADJUSTED PER IRWD STANDARD DRAWINGS AND CONSTRUCTION MANUAL & PROCEDURE GUIDELINES.

CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO, OR USES OF THESE PLANS. ALL

CHANGES TO THE PLANS MUST BE IN WRITING, AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.

THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY FACILITIES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS.

THE LOCATIONS SHOWN ARE APPROXIMATE AND SHALL BE CONFIRMED IN THE FIELD BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

MAKING ANY NECESSARY ADJUSTMENTS TO ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENTS. THE CONTRACTOR IS REQUIRED TO TAKE DUE

PRECAUTIONARY MEASURES TO PREVENT DAMAGE TO ANY UTILITY FACILITIES SHOWN AND ANY OTHER FACILITIES NOT SHOWN ON THESE PLANS.

ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON THESE

PLANS AGREE THAT, IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION

PRACTICES, THEY WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE

RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT. THIS INCLUDES PROVIDING FOR THE SAFETY OF

ALL PERSONS AND PROPERTY AND SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTORS AND

SUBCONTRACTORS FURTHER AGREE TO DEFEND, INDEMNIFY AND HOLD HARMLESS

THE DESIGN PROFESSIONAL FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN

CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE DESIGN PROFESSIONAL.

NOTICE TO CONTRACTOR:

SIGNING & STRIPING GENERAL NOTES:

1.CONTRACTOR SHALL INSTALL SIGNING AND STRIPING IN ACCORDANCE WITH THE APPROVED PLAN.

2.TRAFFIC STRIPES, PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS SHALL BE

MANUFACTURED AND INSTALLED PER CALTRANS PUBLICATION CA-MUTCD LATEST

REVISION, CALTRANS STANDARD PLANS AND CALTRANS STANDARD SPECIFICATIONS, LATEST EDITIONS.

3.ALL SIGNS SHALL BE STANDARD SIZE UNLESS OTHERWISE NOTED ON PLANS. SIGNS

SHALL BE INSTALLED ON SQUARE PERFORATED STEEL TUBE POSTS WITH BREAKAWAY BASES PER SP 1417, UNLESS OTHERWISE NOTED ON THE PLAN.

4.ALL STRIPES, SIGNS AND PAVEMENT MARKINGS SHALL BE REFLECTORIZED.

5.STENCILS FOR PAVEMENT MARKINGS SHALL MATCH ORANGE COUNTY STANDARD STENCILS EXACTLY. ALL STRIPING AND MARKING DETAILS SHALL MATCH CALTRANS STANDARD PLAN DETAILS.

6.ALL CONFLICTING STRIPES AND PAVEMENT MARKINGS SHALL BE REMOVED BY SANDBLASTING. CONFLICTING SIGNS AND RAISED PAVEMENT MARKERS SHALL BE REMOVED. ALL REMOVALS OF SIGNS AND MARKINGS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/CONTRACTOR.

7.NEW APPLICATIONS OF PAINT SHALL BE APPLIED IN TWO (2) EQUAL THICKNESS

TOTALING THE MINIMUM WET THICKNESS INDICATED IN STANDARD SPECIFICATION SECTION 310-5.6.5, "TRAFFIC STRIPES AND MARKINGS", AND SHALL INCLUDE 50% OF

THE REQUIRED BEADS WITH EACH APPLICATION WHEN APPLIED TO NEW ASPHALT

PAVEMENT, PAINT SHALL HAVE A MINIMUM SEVEN DAY PERIOD BETWEEN APPLICATIONS UNLESS OTHERWISE DIRECTED BY THE ENGINEER.

8.ALL REMOVED SIGNS SHALL BE SALVAGED AND DELIVERED TO THE CITY YARD AS DIRECTED BY THE CITY INSPECTOR ON THE JOB SITE.

9.RAISED PAVEMENT MARKERS SHALL BE FURNISHED AND INSTALLED BY THE

CONTRACTOR IN ACCORDANCE WITH THE STRIPING DETAILS SHOWN ON THE SIGNING AND STRIPING PLAN. INSTALLATION SHALL BE COMPLETED WITHIN SEVEN WORKING DAYS OF ROADWAY STRIPING.

10.ALL WORK SHALL BE IN ACCORDANCE WITH THE MUNICIPAL CODE ADOPTED BY THE CITY OF LAKE FOREST AND ANY SPECIAL REQUIREMENTS OF THE PERMIT.

11.THE DEVELOPER/CONTRACTOR SHALL KEEP A COPY OF THE CURRENT ORANGE

COUNTY PUBLIC FACILITY & RESOURCES DEPARTMENT (PF&RD) STANDARD PLANS ON THE CONSTRUCTION SITE AT ALL TIMES.

12.THE DEVELOPER/CONTRACTOR SHALL NOTIFY THE CITY OF LAKE FOREST'S PUBLIC WORKS INSPECTOR AT (949) 461-3494 AT LEAST TWO WORKING DAYS (MINIMUM OF 48

HOURS) PRIOR TO STARTING CONSTRUCTION WORK WHICH REQUIRES PUBLIC WORKS INSPECTION.

13.A CITY OF LAKE FOREST ENCROACHMENT PERMIT SHALL BE REQUIRED TO PERFORM WORK WITHIN THE PUBLIC RIGHT-OF-WAY. CITY APPROVED PLANS DO NOT RELIEVE

THE CONTRACTOR AND/OR DEVELOPER FROM RESPONSIBILITY TO OBTAIN AN ENCROACHMENT PERMIT. A COPY OF THE PERMIT SHALL BE KEPT ON THE CONSTRUCTION SITE AT ALL TIMES.

14.THE DEVELOPER/CONTRACTOR SHALL MAINTAIN ADJACENT STREETS IN A NEAT,

CLEAN, DUST FREE AND SANITARY CONDITION AT ALL TIMES AND TO THE SATISFACTION OF CITY'S INSPECTOR. THE ADJACENT STREETS SHALL BE KEPT CLEAN OF DEBRIS, WITH DUST AND OTHER NUISANCE BEING CONTROLLED AT ALL TIMES.

DEVELOPER SHALL BE RESPONSIBLE FOR ANY CLEAN UP ON ADJACENT STREETS AFFECTED BY HIS CONSTRUCTION. METHOD OF STREET CLEANING SHALL BE BY DRY SWEEPING OF ALL PAVED AREAS. NO STOCKPILING OF BUILDING MATERIALS WILL BE

ALLOWED WITHIN THE PUBLIC RIGHT-OF-WAY WITHOUT THE PERMISSION OF CITY'S PUBLIC WORKS INSPECTOR.

15.PRIOR TO FINAL ACCEPTANCE OF STREET IMPROVEMENTS, ALL STREET PAVEMENT,

STRIPING AND PAVEMENT MARKINGS WITHIN THE PERIMETER OF THE CONSTRUCTION

PROJECT WILL BE RESTORED TO A LIKE NEW CONDITION, AND IN A MANNER MEETING

THE APPROVAL OF THE DIRECTOR OF PUBLIC WORKS/CITY ENGINEER OR HIS AUTHORIZED REPRESENTATIVE. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH COUNTY OF ORANGE STANDARD PLAN NO. 1801, NOTE 17.

16.SHARROWS SHALL BE INSTALLED 5 FEET, MINIMUM FROM NEAREST CURB FACE.

SHEET 5 & 6

1.ALL WORK SHALL CONFORM TO THESE IMPROVEMENT PLANS. THE PROJECT

SPECIFICATIONS, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (SPPWC) "GREEN BOOK" AND CALTRANS

STANDARDS, IN THE EVENT OF A CONFLICT THE MOST STRINGENT STANDARD SHALL PREVAIL.

2.APPROVAL OF THESE PLANS BY THE CITY OR ITS AGENTS DOES NOT RELIEVE THE

CONTRACTOR FROM THE RESPONSIBILITY FOR THE CORRECTIONS OF ERRORS OR OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL APPROPRIATE PLAN

REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR THE

REVIEW AND APPROVAL PRIOR TO CONTINUANCE OF THE AFFECTED IMPROVEMENTS.

3.NO DEVIATION FROM THESE PLANS SHALL BE MADE UNLESS A CHANGE ORDER IS

APPROVED BY THE CITY ENGINEER AND NOTED IN THE REVISION BLOCK OF EACH SHEET WHERE SUCH APPROVAL HAS BEEN GIVEN. THE CONTRACTOR SHALL

OBTAIN AN ENCROACHMENT PERMIT FOR WORK WITHIN THE PUBLIC WAY PRIOR TO THE START OF AN CONSTRUCTION.

4.CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE DIVISIONS OF INDUSTRIAL REGULATIONS (CAL-OSHA) SAFETY STANDARDS. IF REQUIRED BY THE INSPECTOR, THE CONTRACTORS SHALL PROVIDE PROOF OF A PERMIT FROM SAID DIVISION.

5.CONTRACTORS SHALL NOTIFY THE CITY PUBLIC WORKS INSPECTOR 48 HOURS PRIOR TO COMMENCING CONSTRUCTION AND 24 HOURS IN ADVANCE OF SPECIFIC INSPECTION NEEDS DURING THE COURSE OF THE WORK.

6.ALL WORK SHALL BE PERFORMED DURING CITY WORKING HOURS AND WILL BE SUBJECT TO INSPECTION BY THE PUBLIC WORKS DEPARTMENT. WHERE OVERTIME

INSPECTION IS NEEDED, SUBJECT TO THE AVAILABILITY OF AN INSPECTOR AND

APPROVED BY THE CITY ENGINEER, THE CONTRACTORS WILL BE BILLED FOR SAID INSPECTION SERVICES.

7.CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL

REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OR CONTINUANCE OF WORK.

8.CONTRACTORS SHALL LOCATE, PROTECT, AND SAVE ANY AND ALL SURVEY

MONUMENTS THAT WILL BE OR MAY BE DAMAGED OR DESTROYED BY THESE OPERATIONS. ONCE FOUND, THE CONTRACTOR SHALL THEN NOTIFY BOTH THE CITY AND ENGINEER OF RECORD. THE SUPERVISING CIVIL ENGINEER OR HIS

LICENSED SURVEYOR DESIGNEE SHALL RESET ALL SAID MONUMENTS PER THE REQUIREMENTS OF THE PROFESSIONAL LAND SURVEYORS' ACT.

9.UTILITY LOCATION AND DEPTHS SHOWN HEREON HAVE BEEN PLOTTED IN ACCORDANCE WITH DATA FURNISHED BY THE UTILITY COMPANIES. NEITHER THE

CITY NOR THE ENGINEER ASSUMES RESPONSIBILITY FOR THE ACCURACY OF THE INFORMATION RECEIVED FROM EACH COMPANY. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS. ALL COSTS FOR PROTECTING,

REMOVING, AND RESTORING EXISTING IMPROVEMENTS SHALL BE BORNE BY THE CONTRACTOR.

10.EXISTING TRAFFIC SIGNS ARE NOT TO BE REMOVED WITHOUT PRIOR

NOTIFICATION AND APPROVAL OF THE CITY ENGINEER, TRAFFIC CONTROL PLANS

SHALL CONFORM TO THE REQUIREMENTS OF THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD). A TRAFFIC CONTROL PLAN MUST BE SUBMITTED TO THE CITY ENGINEER 20 DAYS PRIOR TO IMPLEMENTATION OF THE TRAFFIC CONTROL. THE CITY ENGINEER'S

WRITTEN APPROVAL MUST BE OBTAINED PRIOR TO IMPLEMENTATION OF THE TRAFFIC CONTROL.

11.DUST CONTROL SHALL BE MAINTAINED AT ALL TIMES. EROSION CONTROL

MEASURES SHALL BE PROVIDED FOR ALL WORK IN CONFORMANCE WITH NPDES REQUIREMENTS.

12.ALL UNDERGROUND UTILITIES AND SERVICE LATERALS SHALL BE INSTALLED PRIOR TO CONSTRUCTING CURBS - GUTTERS, SIDEWALKS, AND PAVING.

13.THE STRUCTURAL SECTIONS HAVE BEEN ESTABLISHED BY THE GEOTECHNICAL/SOILS ENGINEER. ALL AGGREGATE BASE, ASPHALT, AND

CONCRETE MIX DESIGNS SHALL BE SUBMITTED FOR THE CITY ENGINEER'S APPROVAL NO LESS THAN 20 DAYS PRIOR TO THE INSTALLATION OF MATERIAL.

14.AGGREGATE BASE SHALL BE CRUSHED AGGREGATE BASE OR CRUSHED MISCELLANEOUS BASE PER SPPWC. BASE PLACEMENT SHALL NOT COMMENCE

UNTIL OBTAINING CITY ENGINEERS APPROVAL OF COMPACTION REPORT WITH ALL OTHER APPROPRIATE TEST RESULTS (E.G. SIEVE ANALYSIS, SAND EQUIVALENT, R-VALUE) PREPARED BY THE GEOTECHNICAL ENGINEER.

15.ABOVE GROUND STRUCTURES IN THE SIDEWALK, INCLUDING, BUT NOT LIMITED

TO, FACULTIES OWNED BY THE CITY, ANY UTILITY COMPANY OR DISTRICT, AND THE U.S. POSTAL SERVICE SHALL BE CONSISTENT WITH MINIMUM REQUIREMENTS FOR HANDICAP ACCESS. THE TOP OF CURB WIDTH SHALL NOT BE INCLUDED WHEN MEASURING SIDEWALK WIDTH.

16.TRAFFIC SIGNS AND STRIPING SHALL BE INSTALLED BY THE CONTRACTOR IN

ACCORDANCE WITH THE CA MUTCD, APPROVED PLANS, AND TO THE SATISFACTION OF THE CITY ENGINEER.

17.PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL JOIN CONDITIONS FOR GRADING AND DRAINAGE WORK. IF CONDITIONS DIFFER

FROM THOSE SHOWN ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE

ENGINEER AND SHALL NOT BEGIN CONSTRUCTION UNTIL THE CHANGED CONDITIONS HAVE BEEN EVALUATED.

18.THE EXISTENCE, LOCATION AND CHARACTERISTICS OF UNDERGROUND UTILITY

INFORMATION SHOWN ON THESE PLANS HAVE BEEN OBTAINED FROM A REVIEW OF AVAILABLE RECORD DATA.

19.THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR

JOB SITE CONDITIONS, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT. THIS REQUIREMENT

SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER

AND ENGINEER HARMLESS FORM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT.

20.THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE PLANS, THE SOILS

AND/OR GEOLOGY REPORTS, AND THE SITE CONDITIONS PRIOR TO COMMENCING WORK.

21.SHOULD CONFLICTING INFORMATION BE FOUND ON THE PLANS, THE

CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER BEFORE PROCEEDING WITH THE WORK IN QUESTION.

22.THE CONTRACTOR SHALL OBTAIN AN O.S.H.A. PERMIT FORM THE CALIFORNIA DIVISION OF INDUSTRIAL. SAFETY PRIOR TO THE CONSTRUCTION TRENCHES OR EXCAVATIONS WHICH ARE 5 FEET OR DEEPER.

23.CONTRACTOR SHALL COMPLY WITH THE "CALIFORNIA STORM WATER BEST MANAGEMENT PRACTICE HANDBOOK."

24.THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER A MINIMUM OF 48 HOURS IN

ADVANCE TO REQUEST A PRE-CONSTRUCTION MEETING TO DISCUSS THE CITY'S CONSTRUCTION POLICIES AND PROCEDURES. THIS MEETING SHALL BE ATTENDED BY THE CONTRACTOR PROJECT CIVIL AND GEOTECHNICAL ENGINEERS.

25.THE CONTRACTOR SHALL PROTECT ALL EXISTING PROPERTIES FROM DAMAGE IN ACCORDANCE WITH SECTION 7-1.11 SPPWC. ACCESS TO PROPERTIES ADJACENT TO ALL AREAS OF WORK SHALL BE MAINTAINED AT ALL TIMES.

26.ALL PAVEMENT JOIN LINES SHALL BE SAW-CUT IN STRAIGHT LINES EITHER

PARALLEL TO THE CURB OR AT RIGHT ANGLES TO THE ALIGNMENT OF THE STREET CENTERLINE.

27.A.C. PAVEMENT LONGITUDINAL JOIN LINES SHALL BE CONSTRUCTED AT THE EDGES OF TRAFFIC LANES. JOINS WILL NOT BE PERMITTED UNDER THE WHEEL PATHS OF VEHICLES.

28.A TACK COAST SHALL BE APPLIED AT ALL SAW-CUT AND JOIN LINES UNDER THE A.C. OVERLAYS AS SPECIFIED IN SECTION 39-402 OF THE STANDARD SPECIFICATIONS.
4/17/25
4/24/2025
Item: 9
240

OF 20 1

RS S ETIREG
ER N
No. 69467
IL
Exp. 6/30/26
TAVIC
N
AI
E
S
OFES
PR
DE
OI
N
LA
E
I NG

JSAMOHT
WHEAT
OSEPH
F
F CALI
OR
TE
O
N
AI
TJW ENGINEERING, INC.

Traffic Engineering &
Transportation Planning Consultants
9841 Irvine Center Drive, Suite 200, Irvine, CA 92618
t: (949) 878-3509 f: (949) 878-3593
www.tjwengineering.com
1 10
12 16
17 14
13 18
19 15
22 21
20 234
57 8910 6
4/24/2025
Item: 9
241

R
S
S
ET
I
REG ER
N
No. 69467
I L
Exp. 6/30/26
TA VIC
N
AI
E

SOFESPR
DE

OI N LA
E
I

NGJSAMOHT
WHEAT
OSEPH

F FCAL I ORTE O
N
AI
OF 11
TJW ENGINEERING, INC.

Traffic Engineering &
Transportation Planning Consultants
9841 Irvine Center Drive, Suite 200, Irvine, CA 92618
t: (949) 878-3509 f: (949) 878-3593
www.tjwengineering.com
Fire StationDECEMBER 20 , 1991

CITY OF LAKE FOREST
Fire Station
4/24/2025
Item: 9
242

4 9
6 7
3 ATTACHMENT 5
Item: 9
243

4 9
6 7
3 RESOLUTION NO. 2025-

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF LAKE FOREST, CALIFORNIA,
AMENDING THE 2025-2032 CAPITAL
IMPROVEMENT PLAN; AMENDING
APPROPRIATIONS FOR FISCAL YEAR 2025-26
WHEREAS, the 2025-2032 Capital Improvement Plan was adopted by the City Council on June 3, 2025; and
WHEREAS, the appropriations for Fiscal Year 2025-26 were adopted by the City Council on June 3, 2025; and
WHEREAS, modifications are now required as a result of changes during Fiscal Year 2025-26.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE FOREST DOES HEREBY RESOLVE, DETERMINE, FIND AND ORDER AS FOLLOWS:

Section 1. The City Council’s adoption of this Resolution is not a project within the meaning of the California Environmental Quality Act. Specifically, the City’s adoption of the Resolution is an administrative and fiscal function of the City that does not commit the City to any specific project or course of action (State CEQA Guidelines, sections 15378(b)(4) & (b)(5).) Thus, no environmental review of the Resolution is required. The City Council hereby directs staff to prepare, execute and file with the Orange County Clerk a Notice of Exemption within five working days of the adoption of this Resolution.

Section 2. The Foothill Circulation Phasing Plan Fund is amended to increase its Capital Improvement Plan Appropriations for Fiscal Year 2025-26 as demonstrated in Exhibit A.

Section 3. The General CIP Fund is amended to decrease its Capital Improvement Plan Appropriations for Fiscal Year 2025-26 as demonstrated in Exhibit A.

Section 4. The Director of Finance is hereby authorized to move appropriations between programs within program area budgets in concurrence with Department Directors.

Item: 9
244

4 9
6 7
3 Section 5. The City Manager is hereby authorized to transfer appropriations from one program area to another or between funds within the Operating Budget with notification to the City Council Audit Committee.

Section 6. The City Manager is hereby authorized to transfer appropriations from a capital improvement project to another existing project within the adopted Capital Improvement Program with notification to the City Council Audit Committee.

Section 7. The City Clerk shall attest as to the adoption and execution of this Resolution and cause the same to be maintained in the permanent records of the City.

PASSED, APPROVED AND ADOPTED this ___ day of _____ 2025, by the following vote, to wit:
____________________________

SCOTT VOIGTS
MAYOR
ATTEST:
____________________________

THY MERRITT

ACTING CITY CLERK
APPROVED AS TO FORM:
____________________________

MATTHEW RICHARDSON

CITY ATTORNEY
Item: 9
245

4 9
6 7
3 STATE OF CALIFORNIA )

COUNTY OF ORANGE ) SS

CITY OF LAKE FOREST )
I, Thy Merritt, Acting City Clerk of the City of Lake Forest, California, do hereby certify that the foregoing Resolution No. 2025- was duly passed and adopted at a regular meeting of the Lake Forest City Council on the ___ day of _____ 2025, by the following vote, to wit:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSTAIN: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:
____________________________

THY MERRITT

ACTING CITY CLERK
Item: 9
246

4 9
6 7
3 EXHIBIT A
AMENDMENT TO THE 2025-2032

CAPITAL IMPROVEMENT PLAN,

AMENDMENT TO FISCAL YEAR
2025-26 APPROPRIATIONS
Capital Improvement Plan Appropriations
Funding
Source Project Current
Budget
Increase
(Decrease)
Amended
Budget
General Fund
CIP
Arterial Median
Improvement $375,101 ($56,196) $318,905
Total $318,905
Capital Improvement Plan Appropriations
Funding
Source Project Current
Budget
Increase
(Decrease)
Amended
Budget
Foothill
Circulation
Phasing Plan
(FCPP)
Widening
Jeronimo/El Toro $625,205 $2,227,627 $2,852,832
Foothill
Circulation
Phasing Plan
(FCPP)
El Toro Raised
Medians $1,090,000 $5,422,328 $6,512,328
Total $9,365,160
Item: 9
247

CITY COUNCIL AGENDA REPORT
MEETING DATE: 9/2/2025
DEPARTMENT: Public Works
SUBJECT:

ORDINANCE REGARDING SOLID WASTE CONTINUATION RIGHTS
RECOMMENDED ACTION(S):

1. Conduct a first reading of an Ordinance entitled: AN ORDINANCE OF THE CITY COUNCIL OF LAKE FOREST, CALIFORNIA AMENDING CHAPTER 16.03 OF TITLE 16 OF THE MUNICIPAL CODE REGARDING CONTINUATION RIGHTS
EXECUTIVE SUMMARY:

In July 2019, the City Council adopted Ordinance 320, which authorized eight haulers, including CR&R, Inc. (“CR&R”), to provide construction and demolition (“C&D”) waste services. On June 4, 2024, the City Council approved a Solid Waste Agreement (“Agreement”) with CR&R for the collection, processing, and disposal of waste and recycling for residents and businesses in the City effective July 1, 2025. Unlike the previous Franchise Agreement, the new Agreement authorizes CR&R as the exclusive hauler for C&D debris.

The California Public Resources Code 49520 gives continuation rights to haulers for a period of five years following the commencement of an exclusive C&D agreement. The proposed ordinance seeks to limit haulers from expanding their customer base or soliciting new business during the 5-year continuation period.

Staff recommend conducting the first reading of the proposed ordinance. There is no fiscal impact associated with the recommended action.

BACKGROUND:

On July 2, 2019, the City Council adopted Ordinance 320 to define the City’s construction and demolition program. The Ordinance implemented a security deposit to ensure building permit applicants complied with C&D diversion requirements per California’s Green Building Code (“CalGreen”). The Ordinance also restricted contractors to using facilities and haulers who have been approved by the City only. Any hauler could apply with verification that the facilities used by the hauler had an average diversion rate at or above Item: 10
248

CalGreen’s required diversion rate, currently at 65%. Since January 1, 2020, eight haulers have been approved to provide C&D debris removal.

After a competitive selection process, on June 4, 2024, the City Council awarded a Solid Waste Agreement to CR&R Environmental Services, Inc. for the collection, transportation, processing, and diversion of recyclable materials and municipal solid waste (“Agreement”). The initial term of the Agreement is for a period of eight years beginning July 1, 2025, through June 30, 2033, with two additional one-year extensions based on CR&R achieving performance milestones as outlined in the Agreement. The Agreement authorizes CR&R as the exclusive hauler for solid waste services in the City including residential, commercial, multi-family, and construction and demolition (“C&D”) waste and recycling.

DISCUSSION:

Effective July 1, 2025, the new Solid Waste Agreement (“Agreement”) authorizes CR&R as the exclusive hauler for all solid waste services in the City including construction and demolition (“C&D”) debris. The previous Solid Waste Franchise Agreement did not include a provision for exclusive services for the handling of C&D waste.

In accordance with Ordinance 320, adopted in July 2019, the City has allowed haulers who have applications with proof of a minimum of 65% diversion to provide C&D waste services for construction permits within the city. Since January 1, 2020, the City has approved eight haulers, including CR&R, to provide those services. Under the new Agreement, CR&R is the only approved C&D hauler.

California Public Resources Code Section 49520 allows haulers who were previously authorized to provide solid waste services for more than three years prior to the new exclusive Agreement to continue those services for up to five years. This means that contractors with current agreements with haulers, other than CR&R, may continue providing C&D waste services for the next five years.

The City’s municipal code, however, does not specifically prohibit these haulers from soliciting new businesses during the five-year continuation period. The proposed Ordinance 2025-XX would prohibit haulers, currently under contract for C&D services, from expanding their customer base or soliciting new business during the five-year period following notification of the City’s transition to an exclusive agreement. The Ordinance clarifies language in the City’s Municipal Code to support the C&D exclusivity awarded in the Agreement.

Staff recommend conducting a first reading of the attached Ordinance.

Item: 10
249

FISCAL IMPACT:

There is no fiscal impact associated with the recommended action.

ATTACHMENTS:

Proposed Ordinance
Initiated By: Christine Groves, Administrative Services Manager Submitted By: Douglas Erdman, Acting Public Works Director/City Engineer Approved By: Debra Rose, City Manager
Item: 10
250

ATTACHMENT
Item: 10
251

ORDINANCE NO. ____

AN ORDINANCE OF THE CITY COUNCIL OF LAKE FOREST,
CALIFORNIA AMENDING CHAPTER 16.03 OF TITLE 16 OF THE

MUNICIPAL CODE REGARDING CONTINUATION RIGHTS
WHEREAS, the City of Lake Forest (“City”) has historically awarded franchises for the collection of solid waste; and
WHEREAS, section 49520 of the California Public Resources Code provides that certain existing solid waste enterprises may continue to provide their services to the City for a period of up to five years after notification of the City’s transition to an exclusive franchise, contract, license, or permit; and WHEREAS, section 49520 limits the solid waste enterprise’s continued service to “those services” previously authorized by franchise, contract, license, or permit before the notification was provided; and
WHEREAS, courts have held that a city may adopt an ordinance to prevent existing solid waste enterprises from soliciting new business or expanding their customer base during the five year period (Valley Vista Services, Inc. v. City of Monterey Park (2004) 118 Cal.App.4th 881); and WHEREAS, all legal prerequisites to the adoption of the Ordinance have occurred.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE
FOREST DOES ORDAIN AS FOLLOWS:

SECTION 1. The foregoing recitals are true and correct and are incorporated herein as part of this Ordinance.

SECTION 2.Chapter 16.03, section 16.03.025 of the Lake Forest Municipal Code is added to read as follows:
“Sec. 16.03.025. Franchisee or Permittee with Continuation Rights.

No franchisee, permittee, or licensee continuing service pursuant to Public Resources Code section 49520 shall expand its customer base or solicit new business during the five-year period following notification of the City’s transition to an exclusive franchise, permit, contract, or license.” SECTION 3. If any section, subsection, subdivision, sentence, clause, phrase, or portion of this Ordinance for any reason is held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such Item: 10
252

decision shall not affect the validity of the remaining portions of this Ordinance.

The City Council hereby declares that it would have adopted this Ordinance, and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared invalid or unconstitutional.

SECTION 4. The City Clerk shall certify as to the adoption of this Ordinance and shall cause a summary thereof to be published within fifteen (15) days of the adoption and shall post a Certified copy of this Ordinance, including the vote for and against the same, in the Office of the City Clerk, in accordance with Government Code Section 36933.

SECTION 5. This Ordinance shall be effective thirty days after its adoption.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Lake Forest, California, at a regular meeting of the City Council held on __________, 2025 by the following vote, to wit:
_______________________

SCOTT VOIGTS
MAYOR
ATTEST:
______________________________________

THY MERRITT

ACTING CITY CLERK
APPROVED AS TO FORM:
______________________________________

MATTHEW RICHARDSON

CITY ATTORNEY
Item: 10
253

STATE OF CALIFORNIA )

COUNTY OF ORANGE ) SS

CITY OF LAKE FOREST )
I, Thy Merritt, Acting City Clerk of the City of Lake Forest, California do hereby certify that the foregoing Ordinance No. 2025-__ was duly passed and adopted at a regular meeting of the Lake Forest City Council on the _____ day of _______ 2025, by the following vote:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:

ABSTAIN: COUNCIL MEMBERS:
__________________

THY MERRITT

ACTING CITY CLERK