Operational GHG emissions are calculated for area sources, mobile sources, water use, energy use, solid waste disposal, refrigerant use, stationary sources, and vegetation sequestration changes. Operational emissions are evaluated for the first year of proposed Project operation, i.e., calendar year 2027.
Item: 11
1222
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
36 Project GHG Emissions Inventory Ramboll
4.3.1 Area Sources
Area sources are direct sources of GHG emissions, such as emissions from landscaping activities. The area source GHG emissions included in this analysis are landscaping-related fuel combustion sources, such as lawn mowers. These emissions are estimated in the CalEEMod output for the proposed Project in Appendix A-1.
4.3.2 Mobile Sources
The GHG emissions associated with on-road mobile sources are generated from customer and employee vehicles, delivery trucks (i.e., warehouse and tire center delivery trucks), and TRUs that are mounted on the trailers of some warehouse delivery trucks traveling to and from the Project site. The GHG emissions associated with on-road mobile sources include running and starting exhaust emissions. Running exhaust emissions are dependent on VMT.
Starting emissions are associated with the number of starts or time between vehicle uses and the assumptions used in determining these values are described below. Ramboll calculated mobile source emissions using trip rates based on analyses conducted by Kittelson109 and Project-specific information for warehouse and tire center delivery trucks.
The analysis includes the benefit of reductions from adopted regulatory programs that are accounted for within EMFAC2021 including Assembly Bill 1493 (“the Pavley Standard”), the ACC program, the USEPA/NHTSA Advanced Fuel Economy, the HD I/M program, and the Heavy-Duty Omnibus Regulation. While EMFAC2021 incorporates reductions associated with the ACT regulation this analysis assumes that all Project-related delivery trucks are diesel-fueled. Hence, the United States Congress’ and Senate’s recent action110 to disapprove California’s CAA waiver for ACT regulation does not impact this analysis. Additionally, EMFAC2021 does not include the ACC II regulation;111 therefore, GHG reductions associated with this regulation are not included in this analysis.
4.3.2.1 Estimating Mobile Source Emissions
Mobile source emissions calculation requires trip rates, trip lengths, and idle time for each on-road vehicle trip type associated with the proposed Project (e.g., customer and employee vehicles and delivery trucks). Additionally, the operational time for TRU engines that are mounted on some of the trailers delivered to the warehouse is required to estimate exhaust emissions from TRUs. The following sections describe the methodology to derive the necessary inputs for these calculations.
On-Road Vehicle Trip Generation Rates
The total trip generation rates for customer and employee vehicles were calculated as the sum of Project trip generation and latent demand trip generation estimates provided by Kittelson.112 As shown in Table 4-6, the annual average trips for customer and employee vehicles were estimated using the daily weekday and weekend trip rates. The annual average trips for delivery trucks were estimated using the weekly trip rates provided by the 109Kittelson & Associates. 2025. Foothill Ranch Costco Focused Transportation Impact Study. November. 110CARB. CARB Chair Liane Randolph responds to illegal and unconstitutional approval of Congressional Review Act resolutions by the U.S. Senate. Available at: https://ww2.arb.ca.gov/news/carb-chair-liane-randolph-respondsillegal-and-unconstitutional-approval-congressional-review. Accessed: October 2025. 111 In May 2025, the United States Congress and Senate voted to disapprove California’s Clean Air Act waiver for ACC II regulation using the Congressional Review Act. In response to this action, CARB stated that they “will pursue every available remedy to challenge these actions” and Governor Newson announced that California would join a 11-state coalition to advance clean cars.
112Kittelson & Associates. 2025. Foothill Ranch Costco Focused Transportation Impact Study. November.
Item: 11
1223
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
37 Project GHG Emissions Inventory Ramboll
Project team (Table 4-6). The number of TRU equipped trailers that are brought on-site by warehouse delivery trucks and the trip generation rates for warehouse and tire center delivery trucks are based on Project-specific estimates, and presented in Appendix C.
Vehicle Miles Traveled
The VMT of customer and employee vehicles was provided by Kittelson.113 As shown in Table 4-6, the Project VMT for customer and employee vehicles would be negative. The VMT of delivery trucks is calculated as the product of trip rates and trip lengths (Table 4-6). The trip length for delivery trucks is based on Project-specific estimates.
Fleet Mix
The CalEEMod default fleet mix for customer and employee vehicles was adjusted using the default VMT distribution for vehicle technology/fuel categories in EMFAC2021 for Orange County to determine the Project-specific fleet mix of the vehicles visiting the Project (Table C-1 in Appendix C). Customer and employee vehicles primarily represent vehicles used by patrons and employees of the warehouse and include gasoline, plug-in hybrid, electricity, natural gas, and diesel-fueled vehicles. This analysis assumed that customer and employee vehicles did not include heavy heavy-duty trucks or buses. All delivery trucks were assumed to be diesel-fueled heavy heavy-duty diesel trucks.
Mobile Source Emission Factors
Default EMFAC2021 emission factors for the year 2027 were used for customer and employee vehicles. The CalEEMod run for customer and employee vehicles is presented in Appendix A-1.
Delivery truck emission factors for diesel-fueled heavy heavy-duty trucks were obtained from the default EMFAC2021 output for Orange County – South Coast for the year 2027. Refer to Table C-2 in Appendix C for further details. The CalEEMod run for delivery trucks is presented in Appendix A-2.
Exhaust emission factors for TRUs were calculated using OFFROAD2021 outputs for in-State and out-of-State trailer TRUs operating in Orange County as shown in Table C-3 in Appendix C.
TRU Operational Time
The total operational time for each TRU equipped trailer that is brought on-site by a warehouse delivery truck is estimated as the sum of the on-site truck idling time and the travel time for the truck round trip (Table C-4 in Appendix C). Annual operational duration of TRUs was estimated based on total operational time per transport refrigeration unit and the total number of TRUs visiting the Project site on an annual basis. Refer to Table C-4 in Appendix C for further details.
4.3.2.2 Mobile Source Emissions
The annual GHG emissions from area sources, energy usage, water, waste disposed, refrigerant, vegetation, stationary sources, and construction are presented in Appendix A-1. The annual GHG emissions from mobile sources are calculated as the sum of mobile emissions from customer and employee vehicles (presented in Appendix A-1), delivery trucks (presented in Appendix A-2), and TRUs (calculated using OFFROAD2021 emissions output in Table C-4 in Appendix C). These are summarized in Table 4-10. 113 Ibid.
Item: 11
1224
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
38 Project GHG Emissions Inventory Ramboll
4.3.3 Water Supply, Treatment and Distribution
Indirect GHG emissions result from the production of electricity used to convey, treat, and distribute the proposed Project's water and wastewater. The amount of electricity required to convey, treat, and distribute water depends on the volume of water as well as the sources of the water. Additionally, direct CH4 and N2O emissions result from the treatment of wastewater.
The water usage and associated GHG emissions for the proposed Project are provided in the CalEEMod output files in Appendix A-1.
4.3.4 Energy Use
Energy usage within buildings (e.g., electricity and natural gas) contribute to the proposed Project’s GHG inventory. Combustion of any type of fuel emits CO2 and other GHGs directly into the atmosphere; these emissions are considered direct emissions associated with a building. GHGs are also emitted during the generation of electricity from fossil fuels; these emissions are considered as indirect emissions. Ramboll utilized CalEEMod default assumptions to calculate the annual natural gas use for the proposed Project’s land uses, which includes natural gas usage from water heating, primary heating, cooking, cooling, refrigeration, and other miscellaneous end uses.
To estimate GHG emissions from the natural gas and electricity usage for the proposed Project, Ramboll utilized CalEEMod default assumptions, which incorporate 2019 Title 24 Standards.
The energy usage and associated GHG emissions for the proposed Project are provided in the CalEEMod output files in Appendix A-1.
4.3.5 Solid Waste
Municipal solid waste (MSW) is the amount of material that is disposed of by landfilling, recycling, or composting. CalEEMod calculates the indirect GHG emissions associated with waste that is disposed of at a landfill. The program uses annual waste disposal rates from the CalRecycle data for individual land uses. CalEEMod uses the overall California Waste Stream composition to generate the necessary types of different waste disposed into landfills. The program quantifies the GHG emissions associated with the decomposition of the waste, which generates methane based on the total amount of degradable organic carbon.
The program quantifies the CO2 emissions associated with the combustion of methane, if applicable. Default landfill gas concentrations were used as reported in Section 2.4 of AP-42.
The IPCC has a similar method to calculate GHG emissions from MSW in its 2006 Guidelines for National Greenhouse Gas Inventories.
Solid waste generation associated with the proposed Project is based on default values for waste generation in CalEEMod. The waste generation and associated GHG emissions can be found in the CalEEMod output files in Appendix A-1.
4.3.6 Refrigerant Use
The proposed Project includes refrigerant use for warehouse operations, based on default values in CalEEMod. The resulting GHG emissions are provided in the CalEEMod output file in Appendix A-1.
Item: 11
1225
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
39 Project GHG Emissions Inventory Ramboll
4.3.7 Stationary Sources
The proposed Project includes one diesel-powered emergency generator, rated at 95 horsepower, to support warehouse operations. Testing and maintenance of the generator would remain below 200 hours per year114 or 1 hour on any given day (Table 4-7).
Emissions from emergency generator operation were estimated using default assumptions in CalEEMod. In the absence of a CalEEMod default, the N2O emission factor for natural gas fuel was referenced from the USEPA Emission Factors for Greenhouse Gas Inventories (Table C-5 in Appendix C).115 The resulting GHG emissions estimates are provided in the CalEEMod output file in Appendix B-1.
4.3.8 Vegetation Changes
Vegetation changes that occur as a result of land use development constitute a change in the carbon sequestration capacity of a project site. The changes in vegetation are presented in Table 4-9. GHG emissions associated with vegetation changes are estimated in the CalEEMod output for the proposed Project operation in Appendix A-1.
4.4 Total Annual Operational Emissions
As shown in Table 4-10, the total emissions are 962 MT CO2e per year. The operational GHG emissions for the proposed Project are 932 MT CO2e per year. The total emissions from the proposed Project’s construction in 2026 and 2027 is 891 MT CO2e, which was amortized over a typical project lifetime of 30 years, to estimate the total annual GHG emissions from construction (29.7 MT CO2e per year).
116 Area, energy, mobile, and stationary source
emissions were estimated using CalEEMod® (Appendix A-1 and Appendix A-2) except for TRU emissions, which were calculated separately in Table C-4 in Appendix C. 114 Per SCAQMD Rule 1110.2, emergency standby engines must not operate more than 200 hours a year. 115 USEPA Emission Factors for Greenhouse Gas Inventories. Available at:
https://www.epa.gov/system/files/documents/2025-01/ghg-emission-factors-hub-2025.pdf. Accessed:
October 2025.
116 This approach to one-time construction and vegetation change GHG emissions is based on the GHG Threshold Working Group Meeting #13 Minutes from August 26, 2009. Available at: http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/greenhouse-gases-(ghg)-ceqa-significance-thresholds/year-2008-2009/ghg-meeting13/ghg-meeting-13-minutes.pdf. Accessed: October 2025.
Item: 11
1226
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
40 Project Impacts In Context Ramboll
5. PROJECT IMPACTS IN CONTEXT
This section assesses the significance of the proposed Project’s emissions for purposes of CEQA.
5.1 Threshold 1: Would the project generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment? As noted in Section 3.2, in the absence of a quantitative GHG threshold from SCAQMD, this Technical Report assesses significance of the proposed Project’s GHG impacts for Threshold 1 against the SCAQMD draft screening level (3,000 MT CO2e/yr).
Total GHG emissions for the proposed Project construction are summarized in Table 4-10.
In the absence of a construction-specific GHG screening level, the emissions from construction were amortized over a typical project lifetime of 30 years, to estimate the total annual GHG emissions. These amortized emissions were combined with the operational emissions and compared to the SCAQMD draft screening level, which is described in further detail below.
Please note, the proposed Project includes design features that are not quantified in this analysis. Firstly, the Project would include 12 direct current fast charging (DCFC) EV charging stations (including two accessible ADA stalls) which would reduce the operational GHG emissions beyond the levels modeled in this analysis (Section 4.4) by replacing conventionally fueled VMT with EV miles traveled. Secondly, the Project will install solar panels which will generate renewable electricity and will displace some of the electricity used by the Project. This would further reduce the operational GHG emissions beyond levels modeled in this analysis (Section 4.4) by decreasing the average carbon intensity of the electricity used by the Project.
The Project’s annual operational GHG emissions were estimated to be 932 MT CO2e per year (Table 4-10). The amortized construction emissions were added to the Project’s annual operational GHG emissions, and the combined emissions were estimated to be 962 MT CO2e per year (Table 4-10). These emissions are below SCAQMD’s draft GHG emissions screening level (3,000 MT CO2e/yr). Therefore, the GHG emissions associated with the construction and operation of the proposed Project would not have a significant impact on the environment.
5.2 Threshold 2: Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of GHGs? As noted in Section 3.2, this Technical Report assesses the significance of the proposed Project’s GHG impacts for Threshold 2 based on whether it conflicts with the 2022 Scoping Plan Update,117 the current RTP/SCS for SCAG,
118 and the City of Lake Forest General
Plan.119
117CARB. 2022. 2022 CARB Scoping Plan Update – Appendix D, Local Actions. Available at:
https://ww2.arb.ca.gov/sites/default/files/2022-11/2022-sp-appendix-d-local-actions.pdf. Accessed:
October 2025.
118SCAG. A Plan For A Brighter Future. Available at: https://scag.ca.gov/connect-socal. Accessed: October 2025. 119 City of Lake Forest. 2020. General Plan. June. Available at:
https://www.lakeforestca.gov/departments/community_development/planning/plans_and_standard_guidelines.p hp#undefined. Accessed: October 2025.
Item: 11
1227
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
41 Project Impacts In Context Ramboll
5.2.1 2022 Scoping Plan Update
As discussed in Section 2.2.2.2, the 2022 Scoping Plan Update has a table of priority GHG reduction strategies that can be utilized by local governments. The three main priority areas addressed in this table are “Transportation Electrification”, “VMT Reduction”, and “Building Decarbonization”.120 These measures represent the core strategies that local jurisdictions in California can implement to reduce GHGs in alignment with State goals.
The proposed Project would not conflict with the implementation of the 2022 Scooping Plan Update and Statewide Emission Reduction Targets and would include Project features that would support aspects of the 2022 Scoping Plan Update.
As noted above, the Project will include 12 DCFC chargers for plug-in electric vehicles as part of the Project design. This directly supports the “Transportation Electrification” priority area by providing a convenient, low-cost EV charging station to members which would in turn replace conventionally fueled VMT with EV miles traveled.
The second priority area of the Scoping Plan is “VMT Reduction”. The traffic analysis for this Project found that the Project would result in a net reduction in VMT across the region.
Furthermore, the Project is expected to serve the existing population of the area by providing more convenient access to Costco services. The Project will be located in a central location that will allow customers to have multiple needs served in one trip, including but not limited to: eye exams, purchase of household goods and groceries, and tire service.
Additionally, the Project would be an infill development located near existing commercial developments and would therefore support the preservation of natural and working lands and compact infill development.
Lastly, the Project will implement a number of measures to reduce energy usage and will incorporate sustainability features per the California Title 24 energy requirements. The Project will meet the California Green Building Code requirements which includes a number of green building practices to reduce energy use. These practices are listed below and would further support the “Building Decarbonization” priority area of the 2022 Scoping Plan Update.121
• Parking lot light standards are designed in order to provide even light distribution, and utilize less energy compared to a greater number of fixtures at lower heights. The use of LED lamps provides a higher level of perceived brightness with less energy than other lamps such as high pressure sodium.
• New and renewable building materials are typically extracted and manufactured within the region.
• The use of pre-manufactured building components, including structural framing and metal panels, helps to minimize waste during construction. • Pre-manufactured metal wall panels with insulation carry a higher R-Value and greater solar reflectivity to help conserve energy. Building heat absorption is further reduced by a decrease in the thermal mass of the metal wall when compared to a typical masonry block wall.
120CARB. 2022. Final 2022 Scoping Plan Update and Appendices. December. Available at:
https://ww2.arb.ca.gov/our-work/programs/ab-32-climate-change-scoping-plan/2022-scoping-plan-documents.
Accessed: October 2025.
121 Please note that this analysis conservatively does not quantify the benefit of these Project features.
Item: 11
1228
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
42 Project Impacts In Context Ramboll
• Costco uses a reflective cool roof material to produce lower heat absorption and thereby lowering energy requirements during the hot summer months. This roofing material meets the requirements for the EPA’s Energy Star energy efficiency program. • The irrigation system includes the use of deep root watering bubblers for parking lot trees to minimize usage and ensure that water goes directly to the intended planting areas.
• Storm water management plans are designed to maintain quality control and storm water discharge rates.
• Use of native species vegetation and drip irrigation systems greatly reduces potable water consumption.
• High-efficiency restroom fixtures achieve a 40% decrease and water savings over U.S. standards by using high-efficient restroom fixtures.
• Commissioning of mechanical systems to ensure the system is functioning as designed. • HVAC comfort systems are controlled by a computerized building management system to maximize efficiency.
• HVAC units are high-efficiency direct ducted units.
• HVAC units have phased out the use of hydrochlorofluorocarbons completely. Long before the Montreal Protocol timeline.
• Parking lot and exterior lights are controlled by a centrally controlled Energy Management system.
• Lighting is controlled by the overall Project energy management system. • High-efficiency light source and ballasts (LED) and bi-level switching for fluorescent fixtures are used.
• Energy efficient Transformers.
• Use of variable speed motors on make-up air units and booster pumps. • Gas water heaters are direct vent and 94% efficient or greater. • Main Building structure is a pre-engineered system that uses 100% recycled steel materials and is designed to minimize the amount of material utilized. • Roof material is recycled standing seam metal panel, designed to maximum efficiency for spanning the structure.
• When masonry and concrete are used, the materials purchased are local to the Project minimizing the transportation and impact to local road networks. • Construction waste is recycled whenever possible.
• Floor sealant is No-VOC and represents over 80% of the floor area. • CO2 is monitored throughout the warehouse.
• Extensive recycling/reuse program is implemented for warehouse and office space including tires, cardboard, grease, plastics and electronic waste. • Use of plastic shopping bags is avoided.
Item: 11
1229
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
43 Project Impacts In Context Ramboll
• Suppliers are required to reduce packaging and consider alternative packaging solutions. • Distribution facilities are strategically located to minimize miles traveled for delivery.
Deliveries are made in full trucks.
• All Costco trucks are equipped with an engine idle shut off timer.
Lastly, as noted in Section 5.1, the Project will install solar panels which will generate renewable electricity and will displace some of the electricity used by the Project. This would support the “Building Decarbonization” priority area as well by decreasing the average carbon intensity of the electricity used by the Project.
Based on the Project elements described above, the Project would not interfere with the implementation of the 2022 Scoping Plan Update and would include elements that support the goals of the plan. Refer to Table D-1 in Appendix D for further details on the analysis of the 2022 Scoping Plan Update.
5.2.2 Connect SoCal 2024 Plan
The proposed Project would not conflict with the State’s GHG reduction goals and strategies as discussed in the SCAG’s Connect SoCal 2024 Plan122 (the current RTP/SCS for the region), which fall into four main categories: Mobility, Communities, Environment, and Economy.
The proposed Project would not conflict with the implementation of the SCAG’s Connect SoCal 2024 Plan and has several elements that are expected to support the main categories in SCAG’s Connect SoCal 2024 Plan. The Project would create new employment opportunities and is located near an OCTA bus route, therefore placing jobs that are accessible via public transit, in line with the “Economy” category of the Connect SoCal 2024 Plan. In addition, the proposed Project is planned to have many energy-saving design features, as discussed in Section 5.2.1. This would support the “Environment” category of the SCAG’s Connect SoCal 2024 Plan. Lastly, per the conclusions of the Kittelson Transportation Impact Study,123 the proposed Project would result in a net negative VMT and therefore would not impede the “Mobility” and “Communities” categories of the SCAG’s Connect SoCal 2024 Plan. Refer to Table D-2 in Appendix D for further details on the analysis of the SCAG’s Connect SoCal 2024 Plan.
5.2.3 City of Lake Forest General Plan
The proposed Project would not conflict with the City of Lake Forest General Plan, which includes the following main elements: land use and design, mobility, economic development, recreation and resources, public safety, public facilities, and health and wellness elements.
The Project is expected to serve the existing population of the area by providing more convenient access to Costco services. The Project will be located in a central location that will allow customers to have multiple needs served in one trip, including but not limited to: eye exams, purchase of household goods and groceries, and tire service. Additionally, the Project would be an infill development located near existing commercial and residential developments, and would be located near existing transit facilities which would support numerous policies within the General Plan, including “RR-4.2: Land Use Planning”, “RR-4.3:
Development,” and “RR-4.5 Public Transit.” The Project would also include EV charging facilities, as noted in Section 5.1. These chargers would support the policy “RR-4.9: GHG Reduction” by providing a convenient, low-cost EV charging station to members which would 122SCAG. Connect SoCal 2024 Plan. Available at: https://scag.ca.gov/connect-socal. Accessed: October 2025. 123Kittelson & Associates. 2025. Foothill Ranch Costco Focused Transportation Impact Study. November.
Item: 11
1230
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
44 Project Impacts In Context Ramboll
in turn replace conventionally fueled VMT with EV miles traveled therefore reducing the GHG emissions of vehicle miles traveled in the region.
Based on the Project elements described above, the Project would not interfere with the implementation of the Lake Forest General Plan and would include elements that support the goals of the plan. Refer to Table D-3 in Appendix D for further details on the analysis of the Lake Forest General Plan, which assesses the policies and actions.
5.3 Summary
As noted in the previous sections, the proposed Project would not conflict with the 2022 Scoping Plan Update, SCAG’s RTP/SCS, nor the City of Lake Forest’s General Plan. Therefore, the proposed Project’s GHG emissions will be less than significant in the context of Threshold 2. In this context, and based on the analysis above, the proposed Project’s would be less than significant with respect to Threshold 2.
Item: 11
1231
TABLES
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1232
Table 4-1. Construction Schedule - Proposed Project
Costco Foothill RanchLake Forest, California
DRAFT
CalEEMod
®
Phase Typ
e1
Construction
Phase Name1 Start Date1 End Date1
Phase Duration2
(da
y
s)
Demolition Demolition 10/5/2026 11/28/2026 48
Site Preparation Site Preparation 11/29/2026 12/12/2026 12 Grading Grading 12/13/2026 2/27/2027 66
Building Construction 1/23/2027 6/29/2027 135
Concrete Pour 1/23/2027 5/21/2027 102
Paving Paving 5/22/2027 6/11/2027 18
Architectural Coating Architectural Coating 5/17/2027 6/29/2027 38 Notes:
Abbreviations:CalEEMod
® - California Emissions Estimator Model
Building Construction3
3 The Building Construction phases includes a concrete pour subphase which begins on the first day of Building Construction phase and ends the day before the Paving phase begins.
1 Construction phases and duration are based on Project-specific information. 2 The construction work week was assumed to be 6 days per week.
1233
Table 4-2. Construction Equipment Assumptions
Costco Foothill RanchLake Forest, California
DRAFT
CalEEMod®
Phase Type
Construction
Phase Name Equipment Type
Number of
Equipment per
day1
Hours per
day1
Horsepower1
(hp) Load Factor1
Concrete/Industrial Saws 1 8 33 0.73Excavators 3 8 36 0.38Rubber Tired Dozers 2 8 367 0.40Rubber Tired Dozers 3 8 367 0.40Tractors/Loaders/Backhoes 4 8 84 0.37Excavators 2 8 36 0.38Graders 1 8 148 0.41Rubber Tired Dozers 1 8 367 0.40Scrapers 2 8 423 0.48Tractors/Loaders/Backhoes 2 8 84 0.37Cranes 1 7 367 0.29Forklifts 3 8 82 0.20Generator Sets 1 8 14 0.74Tractors/Loaders/Backhoes 3 7 84 0.37Welders 1 8 46 0.45Pavers 2 8 81 0.42Paving Equipment 2 8 89 0.36Rollers 2 8 36 0.38 Architectural Coating Architectural Coating Air Compressors 1 6 37 0.48 Notes:
Abbreviations:CalEEMod® - California Emissions Estimator Model hp - horsepower
Building Construction
&
Concrete Pour2
Building Construction
Paving Paving
2 The Building Construction phases includes the Concrete Pour subphase. The equipment in the Building Construction phase would be used throughout the duration of the Building Construction phase, including during the Concrete Pour subphase. 1 Number of equipment and operation hours based on CalEEMod® defaults. Available at: www.caleemod.com.
Demolition Demolition
Site Preparation Site Preparation
Grading Grading
1234
Table 4-3. Construction Material Movement
Costco Foothill RanchLake Forest, California
DRAFT
Construction Phase Name
Material Imported1
(yd3)
Material Exported1
(yd3)
Grading 26,795 0
Notes:
1 Soil import and export quantities based on Project-specific data.
Abbreviations:yd3 - cubic yard
1235
Table 4-4. Construction Demolition Assumptions
Costco Foothill Ranch
Lake Forest, California
DRAFT
Construction Phase Name
Material Exported1,2,3
(tons)
Demolition 23,295
Notes:
1 Demolition material based on Project-specific data.
Item: 11
1236
Table 4-5. Construction Trip Assumptions
Costco Foothill RanchLake Forest, California
DRAFT
CalEEMod®
Phase Type
Construction
Phase Name
Worker Trips
per Day1,2
Vendor Trips
per Day1,2
Hauling Trips
per Day1,3
Concrete Truck Trips
per Day1,4
Demolition Demolition 15 0 121 0
Site Preparation Site Preparation 18 0 0 0
Grading Grading 20 0 51 0
Building Construction
Building Construction
&
Concrete Pour5
53 27 0 8
Paving Paving 15 0 0 0
Architectural Coating Architectural Coating 21 0 0 0
Notes:
Abbreviations:CalEEMod® - California Emissions Estimator Model4 Project construction will include concrete pours during the Building Construction phase. For the purposes of this analysis, these concrete trucks are modeled as heavy-heavy duty vendor truck trips in CalEEMod®. The one-way trip length for the concrete truck trips is assumed to be the CalEEMod® default one-way trip length of 10.20 miles of vendor trips. 1 Trips are presented as one-way trips.2 Worker and vendor trips are based on CalEEMod® defaults. The one-way trip lengths for worker and vendor trips is assumed the CalEEMod®default values of 18.50 and 10.20 miles, respectively.5 The Building Construction phase includes a Concrete Pour subphase. The worker and vendor trips in the Building Construction phase would be used throughout the duration of the Building Construction phase, including during the Concrete Pour subphase. The concrete trucks trips would occur only during the Concrete Pour subphase.
3 Hauling trips reflect CalEEMod® defaults based on Project-specific estimates of material movement shown in Table 4-3 and Table 4-4. The one-way trip length for hauling trips is assumed to be the CalEEMod® default value of 20 miles.
1237
Table 4-6. Operational Mobile Sources Activity Data
Costco Foothill RanchLake Forest, California
Trip Type1
Average One-Way
Trip Length2
(miles)
Daily Trips3,4,5
(one-way trips/day)
Daily VMT3,6
(mi/day)
Weekly Trips7,8
(one-way trips/week)
Weekly VMT9,10
(mi/week)
Annual
Average Trips
(one-way trips/year)
Annual VMT
(VMT/year)
Customer and Employee Vehicles -- 13,893 -4,737 97,251 -33,159 5,070,945 -1,729,005Delivery Trucks (Warehouse and Tire Center) 37 24 888 144 5,328 7,509 277,817Notes:Abbreviations:mi - mileVMT - vehicle miles traveled1 The trip type is based on Project-specific information. The fleet mix and emission factors used for each trip type can be found in Appendix C.2 The trip length for the delivery trucks is based on Project-specific information. 5 Daily trips for the delivery trucks is based on Project-specific information. The warehouse will receive 10 truck deliveries per day. The tire center will receive deliveries from 2 trucks per week, so it is conservatively assumed that both of these trips could happen on a single day. Each delivery truck would result in two (2) one-way trips. 9 The weekly VMT for the customer and employee vehicles is estimated by multiplying the daily VMT by 7 days/week.10 The weekly VMT for the delivery vehicles is estimated by multiplying the weekly trips by the average one-way trip length.3 Trips and VMT for customer and employee vehicles was obtained from the Foothill Ranch Costco Focused Transportation Impact Study (Kittelson & Associates, Inc.).4 Daily trips for customer and employee vehicles are calculated as the sum of Costco warehouse total trip ends and latent demand trips (primary and diverted). Latent demand trips are trips associated with Costco members making more frequent trips to existing Costco locations due to latent demand. Please see Table 8 and Table 25 of the Foothill Ranch Costco Focused Transportation Impact Study for further details. 6 Daily VMT for the delivery trucks estimated as a product of the average trip length and number of daily trips.7 The weekly trips for customer and employee vehicles is estimated by multiplying the daily one-way trip rate by 7 days/week.8 The weekly trips for delivery vehicles is based upon Project-specific information. As noted above, there would be 2 tire center delivery trucks per week, and the weekly trip rate for the warehouse delivery truck was estimated by multiplying the daily one-way trip rate by 7 days/week. Each delivery truck would result in two (2) one-way trips. These were added together to give a total warehouse and tire center delivery truck weekly rate.
1238
Table 4-7. Operational Emergency Generator Assumptions
Costco Foothill RanchLake Forest, California
E
qui
pment Type Fuel Typ
e1 Number of Units Per Da
y1 Hours/Da
y1 Hours/Year2 Horse
power1 Load Factor3
Emergency Generator CNG 1 1 200 95 0.73
Abbreviations:
CalEEMod
® - California Emissions Estimator Model
CNG - compressed natural gasSCAQMD - South Coast Air Quality Management DistrictNotes:
1 Based on Project-specific information. Note, the emission factors used for assessing the emissions can be found in Appendix C.2 Per SCAQMD Rule 1110.2, emergency standby engines must not operate more than 200 hours a year. Available at:
https://www.aqmd.gov/docs/default-source/rule-book/reg-xi/r1110_2.pdf. Accessed: September 2025. 3 Based on CalEEMod
® defaults.
1239
Table 4-8. Utility GHG Emission Factor Associated with Renewable Portfolio Standard Costco Foothill Ranch
Lake Forest, California
2021 2022 2023 Average Units
CO2 Intensity Factor per Total Energy
Generated1 402 405 318 -- lbs CO2/MWh generated
% of Total Energy From RPS-Eligible
Renewables2 34.8% 35.8% 40.4% -- --
CO2 Intensity Factor per Total Non-RPSEligible Renewable Energy3 617 631 534 594 lbs CO2/MWh generated 2026 RPS (50%) -- -- -- 296.8 lbs CO2/MWh generated
2027 RPS (52%) -- -- -- 285.0 lbs CO2/MWh generated
Notes:
Abbreviations:
CO2 - carbon dioxide
GHG - greenhouse gas
lbs - pounds
MWh - megawatt-hour
RPS - Renewable Portfolio Standards
SCE - Southern California Edison
References:
SCE 2022 Sustainability Report. Available at: https://download.edison.com/406/files/20237/eix-2022-sustainabilityreport.pdf. Accessed: June 2025.
SCE 2023 Sustainability Report. Available at: https://download.edison.com/406/files/20245/eix-2023-sustainabilityreport.pdf. Accessed: June 2025.
SCE 2024 Sustainability Report. Available at:
https://download.edison.com/406/files/20255/202506060031/2024%20Sustainability%20Report.pdf. Accessed:
July 2025.
Senate Bill 100. Available at: https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201720180SB100.
Accessed: June 2025.
Energy Generated (MWh)
Calculated Intensity Factors for Total Energy Delivered4 1 Obtained from SCE's 2023 and 2024 Sustainability Reports. Note that 2024 values are not provided because they are subject to regulatory approval and verification at the time of this report preparation. 2 Obtained from SCE's 2022, 2023, and 2024 Sustainability Reports. 3 The emissions metric presented here is calculated based on the total CO2 emissions for total energy generated divided by the energy generated from non-RPS-eligible renewable sources. 4 The intensity factors for default RPS assumption are calculated by multiplying the percentage of energy delivered from non-RPS-eligible renewable energy by the CO2 emissions per total non-RPS-eligible renewable energy metric calculated above. The emission factors presented here are 52% RPS for 2027 and 60% RPS for 2030 per Senate Bill 100. The estimate provided here assumes that RPS-Eligible renewable energy sources do not result in any CO2 emissions.
Item: 11
1240
Table 4-9. Vegetation Land Use Change Assumptions
Costco Foothill RanchLake Forest, California
Vegetation Land Use Type1
Vegetation
Soil Type2
CO2 Accumulation3
(MT CO2e/acre/yr) Acres, Existing Condition4 Acres, Proposed Project4 Other Alfisols 0.82 1.31 1.44Urban Other 0.0 14.97 14.84 CO2 Accumulation3
(MT CO2e/acre/yr) Acres, Existing Condition4 Acres, Proposed Project4
0.48 1.31 1.44
0 14.97 14.84
Notes:
Abbreviations:CalEEMod
® - California Emissions Estimator Model
CO2 - carbon dioxide
CO2e - carbon dioxide equivalentMT - metric tonUC Davis - University of California, Davisyr - year 4 Acreage of vegetation cover is based on Project-specific information.
Soil Carbon AccumulationAbove and Belowground Biomass Carbon Accumulation Cover Type
GrasslandUrban
2 Vegetation Soil Type at the Project location was determined using UC Davis' SoilWeb online geospatial tool. 1 Vegetation Land Use Type "Other" was chosen as all other CalEEMod ® Vegetation Land Use Types do not fit the description of the Project site. 3 CO2 Accumulation is based on CalEEMod
® default values. The Vegetation Land Use Type, "Other", does not have a CalEEMod ® default CO2
Accumulation value for Alfisols. Therefore, the CO2 Accumulation for Alfisols under the Vegetation Land Use Type, Other, was estimated as the minimum of CO2 Accumulation for Alfisols for all available Land Use Types.
1241
Table 4-10. Annual Average Greenhouse Gas Emissions for Project Operation Costco Foothill Ranch
Lake Forest, California
Emissions Category
Annual GHG Emissions
(MT CO2e/yr)1,2
Area Sources3 3.4
Energy Usage3 326
Mobile3,4,5 348
Stationary Sources3 5.1
Water3 28
Waste Disposed3 222
Refrigerant3 0.1
Vegetation3 -0.17
Operational Sub-Total 932
Construction Amortized6,7 29.7
Total Emissions8 962
SCAQMD Draft Screening Level9 3,000
Exceeds Threshold? NO
Notes:
Abbreviations:
CalEEMod® - CALifornia Emissions Estimator MODel
CH4 - methane
CO2 - carbon dioxide
CO2e - carbon dioxide equivalents
GHG - greenhouse gases
MT - metric tons
N2O - nitrous oxide
SCAQMD - South Coast Air Quality Management District
TRU - transport refrigeration unit
yr - year
9 In the absence of a quantitative GHG threshold from SCAQMD, this Technical Report assesses significance of the Proposed Project’s GHG impacts for Threshold 1 against the SCAQMD draft screening level (3,000 MT CO2e/yr). This is further discussed in Section 3 of the GHG Technical Report.
5 TRU emissions obtained from Table C-3 in Appendix C.
8 Sum of amortized one-time emissions and operational sub-total emissions. 7 One-time emissions from construction was amortized over a 30-year period. 1 Emissions are presented as CO2e, which include CO2, CH4, and N2O emissions, weighted by their respective global warming potentials.
2 Emissions totals may not add up due to rounding. Emissions shown as zero may be non-zero values; however, they are below a meaningful reporting level for this analysis. 3 Obtained from the CalEEMod® model run for project operation in Appendix A-1. 4 Obtained from the operational CalEEMod® model run for delivery trucks (see Appendix A-2). 6 Obtained from the CalEEMod® model run for project construction in Appendix A-1 and additional concrete truck idling emissions (Appendix B, Table B-2).
Item: 11
1242
APPENDIX A
CALEEMOD RUNS
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1243
APPENDIX A-1
CALEEMOD RUN FOR PROJECT CONSTRUCTION AND OPERATION
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1244
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 1 / 43
Costco Foothill Ranch (Project) Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year, Unmitigated
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
3. Construction Emissions Details
3.1. Demolition (2026) - Unmitigated
3.3. Site Preparation (2026) - Unmitigated
3.5. Grading (2026) - Unmitigated
3.7. Grading (2027) - Unmitigated
3.9. Building Construction (2027) - Unmitigated
Item: 11
1245
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 2 / 43
3.11. Concrete Pour (2027) - Unmitigated
3.13. Paving (2027) - Unmitigated
3.15. Architectural Coating (2027) - Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
Item: 11
1246
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 3 / 43
4.7.1. Unmitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
Item: 11
1247
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 4 / 43
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment Item: 11
1248
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 5 / 43
5.14.1. Unmitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
8. User Changes to Default Data
8.1. Justifications
Item: 11
1249
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 6 / 43
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Costco Foothill Ranch (Project)
Construction Start Date 10/5/2026
Operational Year 2027
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.5
Precipitation (days) 4.2
Location 26602 Towne Centre Dr, Foothill Ranch, CA 92610, USA County Orange
City Lake Forest
Air District South Coast AQMD
Air Basin South Coast
TAZ 6046
EDFZ 7
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.32
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Discount Club 165 1000sqft 3.8 165,070 62,553 — — —
Item: 11
1250
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 7 / 43
Parking Lot 12 Acre 12 0.00 0.00 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 49 48 18 29 0.05 0.66 1.4 2.1 0.61 0.34 0.94 — 6,013 6,013 0.22 0.22 5.6 6,081 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.4 4.3 41 46 0.12 1.4 9.1 10 1.3 4.0 5.1 — 14,416 14,416 0.77 1.4 0.45 14,678 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.8 5.6 8.5 11 0.02 0.29 1.7 1.9 0.27 0.43 0.63 — 3,038 3,038 0.14 0.21 1.2 3,090 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.1 1.0 1.5 1.9 < 0.005 0.05 0.30 0.34 0.05 0.08 0.12 — 503 503 0.02 0.03 0.20 512
2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Item: 11
1251
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 8 / 43
2027 49 48 18 29 0.05 0.66 1.4 2.1 0.61 0.34 0.94 — 6,013 6,013 0.22 0.22 5.6 6,081 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2026 4.0 3.2 32 30 0.09 1.2 9.1 10 1.1 4.0 5.1 — 11,930 11,930 0.77 1.4 0.45 12,352 2027 5.4 4.3 41 46 0.12 1.4 5.8 7.2 1.3 2.0 3.3 — 14,416 14,416 0.71 0.82 0.31 14,678 Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.78 0.57 6.5 5.5 0.02 0.22 1.7 1.9 0.20 0.43 0.63 — 2,211 2,211 0.13 0.21 1.2 2,277 2027 5.8 5.6 8.5 11 0.02 0.29 1.0 1.3 0.27 0.34 0.61 — 3,038 3,038 0.14 0.16 1.2 3,090 Annual — — — — — — — — — — — — — — — — — —
2026 0.14 0.10 1.2 1.0 < 0.005 0.04 0.30 0.34 0.04 0.08 0.12 — 366 366 0.02 0.03 0.19 377 2027 1.1 1.0 1.5 1.9 < 0.005 0.05 0.19 0.25 0.05 0.06 0.11 — 503 503 0.02 0.03 0.20 512
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 39 38 7.2 67 -0.01 0.08 -3.3 -3.3 0.07 -0.85 -0.78 406 888 1,294 43 0.86 -10 2,606 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 38 37 7.7 74 -0.01 0.06 -3.3 -3.3 0.06 -0.85 -0.79 406 1,022 1,428 43 0.90 0.51 2,768 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 38 37 7.6 76 -0.01 0.07 -3.3 -3.3 0.07 -0.85 -0.78 406 976 1,382 43 0.89 -4.0 2,711 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 7.0 6.8 1.4 14 > -0.005 0.01 -0.61 -0.60 0.01 -0.15 -0.14 67 162 229 7.1 0.15 -0.65 449 Item: 11
1252
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 9 / 43
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 34 33 6.8 60 -0.01 0.04 -3.3 -3.3 0.04 -0.85 -0.81 — -1,217 -1,217 1.6 0.78 -11 -955 Area 5.3 5.2 0.06 7.2 < 0.005 0.01 — 0.01 0.01 — 0.01 — 30 30 < 0.005 < 0.005 — 30 Energy 0.03 0.01 0.27 0.22 < 0.005 0.02 — 0.02 0.02 — 0.02 — 1,955 1,955 0.22 0.02 — 1,967 Water — — — — — — — — — — — 23 68 92 2.4 0.06 — 169
Waste — — — — — — — — — — — 383 0.00 383 38 0.00 — 1,339 Refrig. — — — — — — — — — — — — — — — — 0.79 0.79
Stationa
ry
< 0.005 < 0.005 0.02 0.14 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 53 53 0.11 < 0.005 0.00 56 Vegetati
on
— — — — — — — — — — — — -1.0 -1.0 — — — -1.0
Total 39 38 7.2 67 -0.01 0.08 -3.3 -3.3 0.07 -0.85 -0.78 406 888 1,294 43 0.86 -10 2,606 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 34 33 7.4 74 -0.01 0.04 -3.3 -3.3 0.04 -0.85 -0.81 — -1,053 -1,053 1.8 0.82 -0.29 -763 Area 4.0 4.0 — — — — — — — — — — — — — — — —
Energy 0.03 0.01 0.27 0.22 < 0.005 0.02 — 0.02 0.02 — 0.02 — 1,955 1,955 0.22 0.02 — 1,967 Water — — — — — — — — — — — 23 68 92 2.4 0.06 — 169
Waste — — — — — — — — — — — 383 0.00 383 38 0.00 — 1,339 Refrig. — — — — — — — — — — — — — — — — 0.79 0.79
Stationa
ry
< 0.005 < 0.005 0.02 0.14 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 53 53 0.11 < 0.005 0.00 56 Vegetati
on
— — — — — — — — — — — — -1.0 -1.0 — — — -1.0
Total 38 37 7.7 74 -0.01 0.06 -3.3 -3.3 0.06 -0.85 -0.79 406 1,022 1,428 43 0.90 0.51 2,768 Item: 11
1253
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 10 / 43
Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 33 33 7.3 71 -0.01 0.04 -3.3 -3.3 0.04 -0.85 -0.81 — -1,096 -1,096 1.8 0.81 -4.7 -815 Area 4.9 4.8 0.04 4.9 < 0.005 0.01 — 0.01 0.01 — 0.01 — 20 20 < 0.005 < 0.005 — 20 Energy 0.03 0.01 0.27 0.22 < 0.005 0.02 — 0.02 0.02 — 0.02 — 1,955 1,955 0.22 0.02 — 1,967 Water — — — — — — — — — — — 23 68 92 2.4 0.06 — 169
Waste — — — — — — — — — — — 383 0.00 383 38 0.00 — 1,339 Refrig. — — — — — — — — — — — — — — — — 0.79 0.79
Stationa
ry
< 0.005 < 0.005 0.01 0.08 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 29 29 0.06 < 0.005 0.00 31 Vegetati
on
— — — — — — — — — — — — -1.0 -1.0 — — — -1.0
Total 38 37 7.6 76 -0.01 0.07 -3.3 -3.3 0.07 -0.85 -0.78 406 976 1,382 43 0.89 -4.0 2,711 Annual — — — — — — — — — — — — — — — — — —
Mobile 6.1 5.9 1.3 13 > -0.005 0.01 -0.61 -0.60 0.01 -0.15 -0.15 — -181 -181 0.29 0.13 -0.79 -135 Area 0.90 0.88 0.01 0.90 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.3 3.3 < 0.005 < 0.005 — 3.4 Energy 0.01 < 0.005 0.05 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 324 324 0.04 < 0.005 — 326 Water — — — — — — — — — — — 3.9 11 15 0.40 0.01 — 28
Waste — — — — — — — — — — — 63 0.00 63 6.3 0.00 — 222
Refrig. — — — — — — — — — — — — — — — — 0.13 0.13
Stationa
ry
< 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 4.8 4.8 0.01 < 0.005 0.00 5.1 Vegetati
on
— — — — — — — — — — — — -0.17 -0.17 — — — -0.17
Total 7.0 6.8 1.4 14 > -0.005 0.01 -0.61 -0.60 0.01 -0.15 -0.14 67 162 229 7.1 0.15 -0.65 449
3. Construction Emissions Details
3.1. Demolition (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Item: 11
1254
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 11 / 43
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
2.7 2.3 21 19 0.03 0.84 — 0.84 0.78 — 0.78 — 3,427 3,427 0.14 0.03 — 3,438 Demoliti
on
— — — — — — 6.7 6.7 — 1.0 1.0 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.36 0.30 2.7 2.5 < 0.005 0.11 — 0.11 0.10 — 0.10 — 451 451 0.02 < 0.005 — 452 Demoliti
on
— — — — — — 0.88 0.88 — 0.13 0.13 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.07 0.05 0.50 0.46 < 0.005 0.02 — 0.02 0.02 — 0.02 — 75 75 < 0.005 < 0.005 — 75 Demoliti
on
— — — — — — 0.16 0.16 — 0.02 0.02 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Item: 11
1255
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 12 / 43
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05 0.05 0.05 0.68 0.00 0.00 0.20 0.20 0.00 0.05 0.05 — 186 186 < 0.005 0.01 0.02 188 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.81 0.12 10 4.4 0.06 0.11 2.2 2.3 0.11 0.62 0.72 — 8,318 8,318 0.63 1.3 0.44 8,726 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.09 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 25 25 < 0.005 < 0.005 0.04 25 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.11 0.02 1.4 0.58 0.01 0.01 0.29 0.30 0.01 0.08 0.09 — 1,094 1,094 0.08 0.17 0.95 1,148 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 4.1 4.1 < 0.005 < 0.005 0.01 4.2 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.02 < 0.005 0.25 0.11 < 0.005 < 0.005 0.05 0.06 < 0.005 0.01 0.02 — 181 181 0.01 0.03 0.16 190
3.3. Site Preparation (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Item: 11
1256
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 13 / 43
Off-Roa 3.7 3.1 29 29 0.05 1.2 — 1.2 1.1 — 1.1 — 5,298 5,298 0.21 0.04 — 5,316 d
Equipm
ent
Dust
From
Material
Movement
— — — — — — 7.7 7.7 — 3.9 3.9 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.12 0.10 0.96 0.95 < 0.005 0.04 — 0.04 0.04 — 0.04 — 174 174 0.01 < 0.005 — 175 Dust
From
Material
Movement
— — — — — — 0.25 0.25 — 0.13 0.13 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.02 0.02 0.17 0.17 < 0.005 0.01 — 0.01 0.01 — 0.01 — 29 29 < 0.005 < 0.005 — 29 Dust
From
Material
Movement
— — — — — — 0.05 0.05 — 0.02 0.02 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Item: 11
1257
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 14 / 43
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.06 0.80 0.00 0.00 0.23 0.23 0.00 0.05 0.05 — 217 217 < 0.005 0.01 0.02 219 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 7.2 7.2 < 0.005 < 0.005 0.01 7.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.2 1.2 < 0.005 < 0.005 < 0.005 1.2 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.5. Grading (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
3.6 3.0 27 28 0.06 1.1 — 1.1 1.0 — 1.0 — 6,599 6,599 0.27 0.05 — 6,621 Item: 11
1258
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 15 / 43
Dust — — — — — — 3.6 3.6 — 1.4 1.4 — — — — — — —
From
Material
Movement
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.16 0.14 1.2 1.2 < 0.005 0.05 — 0.05 0.05 — 0.05 — 294 294 0.01 < 0.005 — 295 Dust
From
Material
Movement
— — — — — — 0.16 0.16 — 0.06 0.06 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03 0.02 0.22 0.22 < 0.005 0.01 — 0.01 0.01 — 0.01 — 49 49 < 0.005 < 0.005 — 49 Dust
From
Material
Movement
— — — — — — 0.03 0.03 — 0.01 0.01 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07 0.07 0.07 0.91 0.00 0.00 0.26 0.26 0.00 0.06 0.06 — 248 248 < 0.005 0.01 0.02 251 Item: 11
1259
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 16 / 43
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.34 0.05 4.3 1.9 0.02 0.04 0.92 0.96 0.04 0.26 0.30 — 3,480 3,480 0.26 0.55 0.18 3,650 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.04 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 11 11 < 0.005 < 0.005 0.02 11 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.02 < 0.005 0.19 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 155 155 0.01 0.02 0.14 163 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.9 1.9 < 0.005 < 0.005 < 0.005 1.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.04 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 26 26 < 0.005 < 0.005 0.02 27
3.7. Grading (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
3.5 2.9 26 27 0.06 1.0 — 1.0 0.96 — 0.96 — 6,598 6,598 0.27 0.05 — 6,621 Dust
From
Material
Movement
— — — — — — 3.6 3.6 — 1.4 1.4 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item: 11
1260
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 17 / 43
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.48 0.40 3.5 3.7 0.01 0.14 — 0.14 0.13 — 0.13 — 899 899 0.04 0.01 — 902 Dust
From
Material
Movement
— — — — — — 0.49 0.49 — 0.19 0.19 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.09 0.07 0.64 0.68 < 0.005 0.03 — 0.03 0.02 — 0.02 — 149 149 0.01 < 0.005 — 149 Dust
From
Material
Movement
— — — — — — 0.09 0.09 — 0.04 0.04 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07 0.06 0.06 0.85 0.00 0.00 0.26 0.26 0.00 0.06 0.06 — 244 244 < 0.005 0.01 0.02 247 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.31 0.05 4.2 1.8 0.02 0.04 0.92 0.96 0.04 0.26 0.30 — 3,412 3,412 0.26 0.55 0.17 3,583 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.12 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 34 34 < 0.005 < 0.005 0.05 34 Item: 11
1261
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 18 / 43
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.04 0.01 0.57 0.25 < 0.005 0.01 0.12 0.13 0.01 0.04 0.04 — 465 465 0.04 0.07 0.38 488 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 5.6 5.6 < 0.005 < 0.005 0.01 5.6 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.10 0.04 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 77 77 0.01 0.01 0.06 81
3.9. Building Construction (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.2 1.0 9.4 13 0.02 0.34 — 0.34 0.31 — 0.31 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.2 1.0 9.4 13 0.02 0.34 — 0.34 0.31 — 0.31 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Item: 11
1262
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 19 / 43
Off-Roa 0.46 0.38 3.5 4.8 0.01 0.12 — 0.12 0.11 — 0.11 — 887 887 0.04 0.01 — 890 d
Equipm
ent
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.07 0.63 0.87 < 0.005 0.02 — 0.02 0.02 — 0.02 — 147 147 0.01 < 0.005 — 147 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.18 0.15 0.16 2.6 0.00 0.00 0.69 0.69 0.00 0.16 0.16 — 676 676 0.01 0.03 2.1 686 Vendor 0.07 0.02 0.83 0.41 0.01 0.01 0.23 0.24 0.01 0.06 0.07 — 833 833 0.04 0.11 2.0 870 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.18 0.15 0.16 2.2 0.00 0.00 0.69 0.69 0.00 0.16 0.16 — 644 644 0.01 0.03 0.06 651 Vendor 0.07 0.02 0.87 0.42 0.01 0.01 0.23 0.24 0.01 0.06 0.07 — 833 833 0.04 0.11 0.05 868 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.07 0.87 0.00 0.00 0.25 0.25 0.00 0.06 0.06 — 241 241 < 0.005 0.01 0.34 244 Vendor 0.02 0.01 0.32 0.15 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 308 308 0.02 0.04 0.32 321 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.16 0.00 0.00 0.05 0.05 0.00 0.01 0.01 — 40 40 < 0.005 < 0.005 0.06 40 Item: 11
1263
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 20 / 43
Vendor < 0.005 < 0.005 0.06 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 51 51 < 0.005 0.01 0.05 53 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.11. Concrete Pour (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Vendor 0.03 0.01 0.39 0.19 < 0.005 < 0.005 0.08 0.08 < 0.005 0.02 0.02 — 288 288 0.02 0.05 0.54 303 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item: 11
1264
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 21 / 43
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Worker 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Vendor 0.03 0.01 0.40 0.19 < 0.005 < 0.005 0.08 0.08 < 0.005 0.02 0.02 — 288 288 0.02 0.05 0.01 303 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Vendor 0.01 < 0.005 0.11 0.05 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 81 81 0.01 0.01 0.06 85 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 13 13 < 0.005 < 0.005 0.01 14 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.13. Paving (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.88 0.74 6.9 10.0 0.01 0.30 — 0.30 0.27 — 0.27 — 1,511 1,511 0.06 0.01 — 1,516 Paving 1.8 1.8 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item: 11
1265
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 22 / 43
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.04 0.04 0.34 0.49 < 0.005 0.01 — 0.01 0.01 — 0.01 — 75 75 < 0.005 < 0.005 — 75 Paving 0.09 0.09 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.06 0.09 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 12 12 < 0.005 < 0.005 — 12 Paving 0.02 0.02 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05 0.04 0.04 0.74 0.00 0.00 0.20 0.20 0.00 0.05 0.05 — 192 192 < 0.005 0.01 0.61 195 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.1 9.1 < 0.005 < 0.005 0.01 9.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item: 11
1266
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 23 / 43
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.5 1.5 < 0.005 < 0.005 < 0.005 1.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.15. Architectural Coating (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.14 0.11 0.83 1.1 < 0.005 0.02 — 0.02 0.02 — 0.02 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coating
s
44 44 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.09 0.12 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 14 14 < 0.005 < 0.005 — 14 Item: 11
1267
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 24 / 43
Architect 4.6 4.6 — — — — — — — — — — — — — — — —
ural
Coating
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.3 2.3 < 0.005 < 0.005 — 2.3 Architect
ural
Coating
s
0.84 0.84 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07 0.06 0.06 1.0 0.00 0.00 0.28 0.28 0.00 0.06 0.06 — 271 271 < 0.005 0.01 0.86 274 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.10 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 27 27 < 0.005 < 0.005 0.04 28 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 4.5 4.5 < 0.005 < 0.005 0.01 4.6 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item: 11
1268
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 25 / 43
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Mobile source emissions results are presented in Sections 2.6. No further detailed breakdown of emissions is available.
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — — 1,266 1,266 0.15 0.02 — 1,275
Parking
Lot
— — — — — — — — — — — — 372 372 0.04 0.01 — 375
Total — — — — — — — — — — — — 1,638 1,638 0.19 0.02 — 1,650 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — — 1,266 1,266 0.15 0.02 — 1,275
Parking
Lot
— — — — — — — — — — — — 372 372 0.04 0.01 — 375
Total — — — — — — — — — — — — 1,638 1,638 0.19 0.02 — 1,650 Annual — — — — — — — — — — — — — — — — — —
Item: 11
1269
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 26 / 43
Discount — — — — — — — — — — — — 210 210 0.02 < 0.005 — 211 Club
Parking
Lot
— — — — — — — — — — — — 62 62 0.01 < 0.005 — 62
Total — — — — — — — — — — — — 271 271 0.03 < 0.005 — 273
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
0.03 0.01 0.27 0.22 < 0.005 0.02 — 0.02 0.02 — 0.02 — 317 317 0.03 < 0.005 — 318 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.03 0.01 0.27 0.22 < 0.005 0.02 — 0.02 0.02 — 0.02 — 317 317 0.03 < 0.005 — 318 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
0.03 0.01 0.27 0.22 < 0.005 0.02 — 0.02 0.02 — 0.02 — 317 317 0.03 < 0.005 — 318 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.03 0.01 0.27 0.22 < 0.005 0.02 — 0.02 0.02 — 0.02 — 317 317 0.03 < 0.005 — 318 Annual — — — — — — — — — — — — — — — — — —
Discount
Club
0.01 < 0.005 0.05 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 52 52 < 0.005 < 0.005 — 53 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 < 0.005 0.05 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 52 52 < 0.005 < 0.005 — 53 Item: 11
1270
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 27 / 43
4.3. Area Emissions by Source
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s
3.6 3.6 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.46 0.46 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
1.3 1.2 0.06 7.2 < 0.005 0.01 — 0.01 0.01 — 0.01 — 30 30 < 0.005 < 0.005 — 30 Total 5.3 5.2 0.06 7.2 < 0.005 0.01 — 0.01 0.01 — 0.01 — 30 30 < 0.005 < 0.005 — 30 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s
3.6 3.6 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.46 0.46 — — — — — — — — — — — — — — — —
Total 4.0 4.0 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Item: 11
1271
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 28 / 43
Consum 0.65 0.65 — — — — — — — — — — — — — — — —
er
Product
Architect
ural
Coating
s
0.08 0.08 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.16 0.15 0.01 0.90 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.3 3.3 < 0.005 < 0.005 — 3.4 Total 0.90 0.88 0.01 0.90 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.3 3.3 < 0.005 < 0.005 — 3.4
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 23 68 92 2.4 0.06 — 169
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 23 68 92 2.4 0.06 — 169
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 23 68 92 2.4 0.06 — 169
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 23 68 92 2.4 0.06 — 169
Item: 11
1272
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 29 / 43
Annual — — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 3.9 11 15 0.40 0.01 — 28
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.9 11 15 0.40 0.01 — 28
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 383 0.00 383 38 0.00 — 1,339
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 383 0.00 383 38 0.00 — 1,339 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 383 0.00 383 38 0.00 — 1,339
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 383 0.00 383 38 0.00 — 1,339 Annual — — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 63 0.00 63 6.3 0.00 — 222
Item: 11
1273
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 30 / 43
Parking — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Lot
Total — — — — — — — — — — — 63 0.00 63 6.3 0.00 — 222
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — — — — — — 0.79 0.79
Total — — — — — — — — — — — — — — — — 0.79 0.79
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — — — — — — 0.79 0.79
Total — — — — — — — — — — — — — — — — 0.79 0.79
Annual — — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — — — — — — 0.13 0.13
Total — — — — — — — — — — — — — — — — 0.13 0.13
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Item: 11
1274
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 31 / 43
Equipm TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e ent
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Emerge
ncy
Generat
or
< 0.005 < 0.005 0.02 0.14 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 53 53 0.11 < 0.005 0.00 56 Total < 0.005 < 0.005 0.02 0.14 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 53 53 0.11 < 0.005 0.00 56 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Emerge
ncy
Generat
or
< 0.005 < 0.005 0.02 0.14 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 53 53 0.11 < 0.005 0.00 56 Item: 11
1275
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 32 / 43
Total < 0.005 < 0.005 0.02 0.14 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 53 53 0.11 < 0.005 0.00 56 Annual — — — — — — — — — — — — — — — — — —
Emerge
ncy
Generat
or
< 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 4.8 4.8 0.01 < 0.005 0.00 5.1 Total < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.00 < 0.005 0.00 4.8 4.8 0.01 < 0.005 0.00 5.1
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Item: 11
1276
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 33 / 43
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Other — — — — — — — — — — — — -0.64 -0.64 — — — -0.64
Urban — — — — — — — — — — — — 0.00 0.00 — — — 0.00
Total — — — — — — — — — — — — -0.64 -0.64 — — — -0.64
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Other — — — — — — — — — — — — -0.64 -0.64 — — — -0.64
Urban — — — — — — — — — — — — 0.00 0.00 — — — 0.00
Total — — — — — — — — — — — — -0.64 -0.64 — — — -0.64
Annual — — — — — — — — — — — — — — — — — —
Other — — — — — — — — — — — — -0.11 -0.11 — — — -0.11
Urban — — — — — — — — — — — — 0.00 0.00 — — — 0.00
Total — — — — — — — — — — — — -0.11 -0.11 — — — -0.11
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Grassla
nd
— — — — — — — — — — — — -0.38 -0.38 — — — -0.38
Urban — — — — — — — — — — — — 0.00 0.00 — — — 0.00
Total — — — — — — — — — — — — -0.38 -0.38 — — — -0.38
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Item: 11
1277
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 34 / 43
Grassla — — — — — — — — — — — — -0.38 -0.38 — — — -0.38 nd
Urban — — — — — — — — — — — — 0.00 0.00 — — — 0.00
Total — — — — — — — — — — — — -0.38 -0.38 — — — -0.38
Annual — — — — — — — — — — — — — — — — — —
Grassla
nd
— — — — — — — — — — — — -0.06 -0.06 — — — -0.06
Urban — — — — — — — — — — — — 0.00 0.00 — — — 0.00
Total — — — — — — — — — — — — -0.06 -0.06 — — — -0.06
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Item: 11
1278
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 35 / 43
Sequest — — — — — — — — — — — — — — — — — —
ered
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 10/5/2026 11/28/2026 6.0 48 —
Site Preparation Site Preparation 11/29/2026 12/12/2026 6.0 12 — Grading Grading 12/13/2026 2/27/2027 6.0 66 —
Building Construction Building Construction 1/23/2027 6/29/2027 6.0 135 — Concrete Pour Building Construction 1/23/2027 5/21/2027 6.0 102 — Paving Paving 5/22/2027 6/11/2027 6.0 18 —
Architectural Coating Architectural Coating 5/17/2027 6/29/2027 6.0 38 — Item: 11
1279
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 36 / 43
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.0 33 0.73
Demolition Excavators Diesel Average 3.0 8.0 36 0.38
Demolition Rubber Tired Dozers Diesel Average 2.0 8.0 367 0.40 Site Preparation Rubber Tired Dozers Diesel Average 3.0 8.0 367 0.40 Site Preparation Tractors/Loaders/Back
hoes
Diesel Average 4.0 8.0 84 0.37
Grading Excavators Diesel Average 2.0 8.0 36 0.38
Grading Graders Diesel Average 1.00 8.0 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 8.0 367 0.40 Grading Scrapers Diesel Average 2.0 8.0 423 0.48
Grading Tractors/Loaders/Back
hoes
Diesel Average 2.0 8.0 84 0.37
Building Construction Cranes Diesel Average 1.00 7.0 367 0.29 Building Construction Forklifts Diesel Average 3.0 8.0 82 0.20 Building Construction Generator Sets Diesel Average 1.00 8.0 14 0.74 Building Construction Tractors/Loaders/Back
hoes
Diesel Average 3.0 7.0 84 0.37
Building Construction Welders Diesel Average 1.00 8.0 46 0.45 Paving Pavers Diesel Average 2.0 8.0 81 0.42
Paving Paving Equipment Diesel Average 2.0 8.0 89 0.36
Paving Rollers Diesel Average 2.0 8.0 36 0.38
Architectural Coating Air Compressors Diesel Average 1.00 6.0 37 0.48
5.3. Construction Vehicles
Item: 11
1280
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 37 / 43
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition Worker 15 19 LDA,LDT1,LDT2
Demolition Vendor — 10 HHDT,MHDT
Demolition Hauling 121 20 HHDT
Demolition Onsite truck — — HHDT
Site Preparation Worker 18 19 LDA,LDT1,LDT2
Site Preparation Vendor — 10 HHDT,MHDT
Site Preparation Hauling 0.00 20 HHDT
Site Preparation Onsite truck — — HHDT
Grading Worker 20 19 LDA,LDT1,LDT2
Grading Vendor — 10 HHDT,MHDT
Grading Hauling 51 20 HHDT
Grading Onsite truck — — HHDT
Building Construction Worker 53 19 LDA,LDT1,LDT2
Building Construction Vendor 27 10 HHDT,MHDT
Building Construction Hauling 0.00 20 HHDT
Building Construction Onsite truck — — HHDT
Concrete Pour Worker 0.00 19 LDA,LDT1,LDT2
Concrete Pour Vendor 8.2 10 HHDT
Concrete Pour Hauling 0.00 20 HHDT
Concrete Pour Onsite truck — — HHDT
Paving Worker 15 19 LDA,LDT1,LDT2
Paving Vendor — 10 HHDT,MHDT
Paving Hauling 0.00 20 HHDT
Paving Onsite truck — — HHDT
Architectural Coating Worker 21 19 LDA,LDT1,LDT2
Architectural Coating Vendor — 10 HHDT,MHDT
Item: 11
1281
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 38 / 43
Architectural Coating Hauling 0.00 20 HHDT
Architectural Coating Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00 0.00 247,605 82,535 32,644
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (Ton of Debris)
Acres Paved (acres)
Demolition 0.00 0.00 0.00 23,295 0.00
Site Preparation — — 18 0.00 0.00
Grading 26,795 0.00 237 0.00 0.00
Paving 0.00 0.00 0.00 0.00 12
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
Water Demolished Area 2 36% 36%
5.7. Construction Paving
Item: 11
1282
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 39 / 43
Phase Name Land Use Area Paved (acres) % Asphalt
Paving Discount Club 0.00 0%
Paving Parking Lot 12 100%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00 297 0.03 < 0.005
2027 0.00 285 0.03 < 0.005
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Total all Land Uses 13,893 13,893 13,893 5,070,945 -4,737 -4,737 -4,737 -1,729,005
5.10. Operational Area Sources
5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number) Discount Club Wood Fireplaces 0 0
Discount Club Gas Fireplaces 0 0
Discount Club Propane Fireplaces 0 0
Discount Club Electric Fireplaces 0 0
Discount Club No Fireplaces 0 0
Discount Club Conventional Wood Stoves 0 0
Discount Club Catalytic Wood Stoves 0 0
Discount Club Non-Catalytic Wood Stoves 0 0
Item: 11
1283
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 40 / 43
Discount Club Pellet Wood Stoves 0 0
Parking Lot Wood Fireplaces 0 0
Parking Lot Gas Fireplaces 0 0
Parking Lot Propane Fireplaces 0 0
Parking Lot Electric Fireplaces 0 0
Parking Lot No Fireplaces 0 0
Parking Lot Conventional Wood Stoves 0 0
Parking Lot Catalytic Wood Stoves 0 0
Parking Lot Non-Catalytic Wood Stoves 0 0
Parking Lot Pellet Wood Stoves 0 0
5.10.2. Architectural Coatings
— Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
undefined 0.00 0.00 247,605 82,535 32,644
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Discount Club 1,621,213 285 0.0330 0.0040 988,265
Parking Lot 476,600 285 0.0330 0.0040 0.00
Item: 11
1284
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 41 / 43
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Discount Club 12,227,151 810,710
Parking Lot 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Discount Club 710 0.00
Parking Lot 0.00 0.00
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Discount Club Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.0 4.0 18
Discount Club Stand-alone retail
refrigerators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
Item: 11
1285
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 42 / 43
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor Emergency Generator CNG 1.00 1.00 200 95 0.73
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres Other Alfisols 1.3 1.4
Urban Other 15 15
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
Grassland 1.3 1.4
Urban 15 15
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year) Item: 11
1286
Costco Foothill Ranch (Project) Custom Report, 11/14/2025 43 / 43
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Characteristics: Utility Information CO2 emission factor estimated based upon RPS compliance.
Land Use Based on project-specific information.
Construction: Construction Phases Based on project-specific information.
Construction: Off-Road Equipment Concrete pour phase only includes concrete trucks.
Construction: Dust From Material Movement Construction material movement based on project-specific information. Watering 2x/day based on SCAQMD Rule 403, Table 1.
Construction: Trips and VMT Based on project-specific information.
Construction: Electricity CO2 emission factor estimated based upon RPS compliance.
Operations: Fleet Mix Based on project-specific information.
Operations: Generators + Pumps EF Based on project-specific information.
Item: 11
1287
APPENDIX A-2
CALEEMOD RUN FOR DELIVERY TRUCKS
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1288
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 1 / 19
Costco Foothill Ranch (Delivery Trucks) Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated
Item: 11
1289
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 2 / 19
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.9. Operational Mobile Sources
Item: 11
1290
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 3 / 19
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
Item: 11
1291
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 4 / 19
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
8. User Changes to Default Data
8.1. Justifications
Item: 11
1292
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 5 / 19
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Costco Foothill Ranch (Delivery Trucks)
Operational Year 2027
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.5
Precipitation (days) 4.2
Location 26602 Towne Centre Dr, Foothill Ranch, CA 92610, USA County Orange
City Lake Forest
Air District South Coast AQMD
Air Basin South Coast
TAZ 6046
EDFZ 7
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.32
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Discount Club 165 1000sqft 3.8 165,070 62,553 — — —
Parking Lot 12 Acre 12 0.00 0.00 — — —
Item: 11
1293
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 6 / 19
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.05 0.04 3.4 0.37 0.03 0.05 0.81 0.86 0.05 0.22 0.26 0.00 3,052 3,052 < 0.005 0.48 5.7 3,201 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.05 0.04 3.6 0.38 0.03 0.05 0.81 0.86 0.05 0.22 0.26 0.00 3,053 3,053 < 0.005 0.48 0.15 3,196 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.04 0.04 3.1 0.32 0.02 0.04 0.69 0.73 0.04 0.19 0.23 0.00 2,616 2,616 < 0.005 0.41 2.1 2,741 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.01 0.01 0.56 0.06 < 0.005 0.01 0.13 0.13 0.01 0.03 0.04 0.00 433 433 < 0.005 0.07 0.35 454
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.05 0.04 3.4 0.37 0.03 0.05 0.81 0.86 0.05 0.22 0.26 — 3,052 3,052 < 0.005 0.48 5.7 3,201 Item: 11
1294
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 7 / 19
Area 0.00 0.00 — — — — — — — — — — — — — — — —
Waste — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Total 0.05 0.04 3.4 0.37 0.03 0.05 0.81 0.86 0.05 0.22 0.26 0.00 3,052 3,052 < 0.005 0.48 5.7 3,201 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.05 0.04 3.6 0.38 0.03 0.05 0.81 0.86 0.05 0.22 0.26 — 3,053 3,053 < 0.005 0.48 0.15 3,196 Area 0.00 0.00 — — — — — — — — — — — — — — — —
Waste — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Total 0.05 0.04 3.6 0.38 0.03 0.05 0.81 0.86 0.05 0.22 0.26 0.00 3,053 3,053 < 0.005 0.48 0.15 3,196 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 0.04 0.04 3.1 0.32 0.02 0.04 0.69 0.73 0.04 0.19 0.23 — 2,616 2,616 < 0.005 0.41 2.1 2,741 Area 0.00 0.00 — — — — — — — — — — — — — — — —
Waste — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Total 0.04 0.04 3.1 0.32 0.02 0.04 0.69 0.73 0.04 0.19 0.23 0.00 2,616 2,616 < 0.005 0.41 2.1 2,741 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.01 0.01 0.56 0.06 < 0.005 0.01 0.13 0.13 0.01 0.03 0.04 — 433 433 < 0.005 0.07 0.35 454 Area 0.00 0.00 — — — — — — — — — — — — — — — —
Waste — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 0.01 0.56 0.06 < 0.005 0.01 0.13 0.13 0.01 0.03 0.04 0.00 433 433 < 0.005 0.07 0.35 454
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Mobile source emissions results are presented in Sections 2.6. No further detailed breakdown of emissions is available.
4.2. Energy
Item: 11
1295
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 8 / 19
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.3. Area Emissions by Source
Item: 11
1296
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 9 / 19
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s
0.00 0.00 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.00 0.00 — — — — — — — — — — — — — — — —
Total 0.00 0.00 — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s
0.00 0.00 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.00 0.00 — — — — — — — — — — — — — — — —
Total 0.00 0.00 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Product
s
0.00 0.00 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.00 0.00 — — — — — — — — — — — — — — — —
Item: 11
1297
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 10 / 19
Total 0.00 0.00 — — — — — — — — — — — — — — — —
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Item: 11
1298
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 11 / 19
Total — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Annual — — — — — — — — — — — — — — — — — —
Discount
Club
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Item: 11
1299
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 12 / 19
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Item: 11
1300
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 13 / 19
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Item: 11
1301
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 14 / 19
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Item: 11
1302
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 15 / 19
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
Item: 11
1303
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 16 / 19
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Total all Land Uses 24 24 24 7,509 888 888 888 277,817
5.10. Operational Area Sources
5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number) Discount Club Wood Fireplaces 0 0
Discount Club Gas Fireplaces 0 0
Discount Club Propane Fireplaces 0 0
Discount Club Electric Fireplaces 0 0
Discount Club No Fireplaces 0 0
Discount Club Conventional Wood Stoves 0 0
Discount Club Catalytic Wood Stoves 0 0
Discount Club Non-Catalytic Wood Stoves 0 0
Discount Club Pellet Wood Stoves 0 0
Parking Lot Wood Fireplaces 0 0
Parking Lot Gas Fireplaces 0 0
Parking Lot Propane Fireplaces 0 0
Parking Lot Electric Fireplaces 0 0
Parking Lot No Fireplaces 0 0
Parking Lot Conventional Wood Stoves 0 0
Parking Lot Catalytic Wood Stoves 0 0
Parking Lot Non-Catalytic Wood Stoves 0 0
Parking Lot Pellet Wood Stoves 0 0
Item: 11
1304
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 17 / 19
5.10.2. Architectural Coatings
— Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
undefined 0.00 0.00 247,605 82,535 32,644
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 0.00
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Discount Club 0.00 0.00
Parking Lot 0.00 0.00
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Item: 11
1305
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 18 / 19
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
8. User Changes to Default Data
Item: 11
1306
Costco Foothill Ranch (Delivery Trucks) Custom Report, 11/14/2025 19 / 19
8.1. Justifications
Screen Justification
Characteristics: Utility Information CO2 emission factor estimated based upon RPS compliance.
Land Use Based on project-specific information.
Operations: Fleet Mix Updated for delivery truck mobile emissions only.
Operations: Vehicle EF Emission factors for Diesel HHDTs were obtained from the default EMFAC2021 output for Orange County - South Coast calendar year 2027. HFC emission factors were kept as CalEEMod defaults.
Operations: Consumer Products Updated for delivery truck mobile emissions only.
Operations: Architectural Coatings Updated for delivery truck mobile emissions only.
Operations: Landscape Equipment Updated for delivery truck mobile emissions only.
Operations: Energy Use Updated for delivery truck mobile emissions only.
Operations: Water and Waste Water Updated for delivery truck mobile emissions only.
Operations: Solid Waste Updated for delivery truck mobile emissions only.
Operations: Refrigerants Updated for delivery truck mobile emissions only.
Item: 11
1307
APPENDIX B
SUPPORTING EMISSION CALCULATIONS FOR PROJECT CONSTRUCTION DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1308
List of Tables
Table B-1:
Table B-2:
Greenhouse Gas Emission Factors for Concrete Truck Idling Greenhouse Gas Emissions from Concrete Trucks Idling and On-Road Travel During Project Construction
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1309
Table B-1. Greenhouse Gas Emission Factors for Concrete Truck Idling Foothill Ranch Costco ProjectLake Forest, California
EMFAC
Vehicle
Class Fuel Typ
e
Concrete Truck
Fleet Mix 1
CO2 Emission Factor 2
(grams/idle-minute)
CH4 Emission Factor 2
(grams/idle-minute)
N2O Emission Factor 2
(grams/idle-minute)
HHDT Diesel 100% 8.84E+01 1.83E-03 0.00E+00
8.84E+01 1.83E-03 0.00E+00
Notes:
Abbreviations:CH4 - methane
CO2 - carbon dioxideEMFAC - EMission FACtors modelHHDT - Heavy Heavy-Duty TruckN2O - nitrous oxide SC - South Coast
Weighted Average Emission Factor 3
1 Concrete trucks are conservatively assumed to be diesel-fueled HHDT. 2 Idling emission factors were obtained from the default EMFAC2021 project-level output for Orange (SC) sub-area in calendar year 2027.
3 Weighted average emission factors for concrete trucks are calculated as the sumproduct of the Project-specific fleet mix and the emission factors for the individual vehicle class/fuel categories within that fleet mix.
DRAFT
1310
Table B-2. Greenhouse Gas Emissions from Concrete Trucks Idling and On-Road Travel During Project Construction Foothill Ranch Costco Project Lake Forest, California
Concrete Truck
Activity
Number of Days of
Concrete Truck Activity 1
(days)
Daily Trips 1
(round trips/day)
Annual Trips
(round trips/year)
Idle
Duration 1
(minutes/ round trip)
CO2
Emissions
(MT/year)
CH4
Emissions
(MT/year)
N2O
Emissions
(MT/year)
CO2e
Emissions
(MT/year)
Idling 2 102 4 419 60 2.2 4.6E-05 0 2.2
On-Road Travel 3 102 4 419 - 13 1.1E-03 0.0022 14
16 1.2E-03 0.0022 16
Notes:
Abbreviations:CalEEMod® - California Emissions Estimator Model CH4 - methane
CO2 - carbon dioxide
CO2e - carbon dioxide equivalentsIPCC - Intergovernmental Panel on Climate ChangeMT - metric tonsN2O - nitrous oxide Total Emissions
1 Based on Project-specific information.2 Idling emissions were estimated as a product of the emission factors from Table B-1, the idle duration per round trip, and the number of round trips per year.3 Obtained from the CalEEMod® model run for construction in Appendix A-1.
1311
APPENDIX C
SUPPORTING EMISSION CALCULATIONS FOR PROJECT OPERATION
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1312
List of Tables
Table C-1:
Table C-2:
Table C-3:
Table C-4:
Table C-5:
Operational Mobile Source Fleet Mixes
Operational Delivery Truck GHG Emission Factors
Operational GHG Emission Factors for Warehouse Delivery Truck Transport Refrigeration Units
Greenhouse Gas Emission Estimates for Transport Refrigeration Units Operational Emergency Generator GHG Emission Factors
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1313
Table C-1. Operational Mobile Source Fleet Mixes
Costco Foothill Ranch
Lake Forest, California
Gasoline 41,402,174 43.67% --
Plug-in Hybrid 1,693,689 1.79% --
Electricity 4,089,427 4.31% --
Diesel 72,324 0.08% --
Gasoline 3,351,769 3.98% --
Plug-in Hybrid 17,553 0.02% --
Electricity 21,261 0.03% --
Diesel 181 0.00% --
Gasoline 22,020,145 23.13% --
Plug-in Hybrid 311,544 0.33% --
Electricity 224,425 0.24% --
Diesel 88,904 0.09% --
Gasoline 12,751,503 13.98% --
Plug-in Hybrid 186,464 0.20% --
Electricity 237,228 0.26% --
Diesel 174,319 0.19% --
Gasoline 1,647,637 1.69% --
Diesel 995,052 1.02% --
Electricity 91,019 0.09% --
Gasoline 244,223 0.26% --
Diesel 433,595 0.46% --
Electricity 22,491 0.02% --
Gasoline 343,883 0.35% --
Diesel 1,162,783 1.17% --
Electricity 35,495 0.04% --
Natural Gas 13,849 0.01% --
Gasoline -- -- --
Diesel 1,309,094 -- 100%
Electricity -- -- --
Natural Gas -- -- --
Gasoline -- -- --
Diesel -- -- --
Electricity -- -- --
Natural Gas -- -- --
Gasoline -- -- --
Diesel -- -- --
Electricity -- -- --
Natural Gas -- -- --
MCY Gasoline 2.2% 2.2% 334,154 2.24% --
Gasoline -- -- --
Diesel -- -- --
Electricity -- -- --
Natural Gas -- -- --
Gasoline 54,533 0.24% --
Diesel 29,338 0.13% --
Abbreviations:
CalEEMod® - CALifornia Emissions Estimator MODel MDV - medium-duty vehicle EMFAC - EMission FACtors model MH - motor homes
HHDT - Heavy heavy-duty truck MHDT - medium heavy-duty trucks LDA - light duty automobiles OBUS - other buses
LDT - light-duty trucks SBUS - school buses
LHDT - light heavy-duty trucks UBUS - urban buses
MCY - motorcycles VMT - vehicle miles traveled
Vehicle
Category Fuel Type
CalEEMod®
Default Fleet
Mix1
Fleet Mix for
Vehicles
Visiting the
Warehouse2
EMFAC VMT
Output3
(miles/day)
Customer and
Employee Vehicles4
LDA 49.5% 49.8%
LDT1 4.0% 4.0%
LDT2 23.6% 23.8%
MHDT 1.6% 1.6%
MDV 14.5% 14.6%
LHDT1 2.8% 2.8%
Delivery Truck
Fleet Mix5
UBUS 0.04% --
SBUS 0.1% --
HHDT 0.6% --
OBUS 0.1% --
LHDT2 0.7% 0.7%
MH 0.4% 0.4%
Notes:
1 CalEEMod® default for Orange County, calendar year 2027. 2 Estimated using the CalEEMod® default fleet mix for Orange County. EMFAC vehicle classes that represent vehicles visiting the warehouse include LDA, LDT1, LDT2, MDV, LHDT1, LHDT2, MHDT, MCY, and MH. 3 Default EMFAC2021 output for the Orange County subarea in calendar year 2027. 4 The Project-specific fleet mix for customer and employee vehicles is estimated by apportioning the fleet mix for vehicles visiting the warehouse into the Project-specific fuel types (gasoline, plug-in hybrid, electricity, diesel) within each EMFAC vehicle class for vehicles visiting the warehouse (LDA, LDT1, LDT2, MDV, LHDT1, LHDT2, MHDT, MCY, and MH) using the default EMFAC VMT output for those fuel types.
5 The EMFAC vehicle class that represents delivery trucks is HHDT.
Item: 11
1314
Table C-2. Operational Delivery Truck GHG Emission Factors Costco Foothill RanchLake Forest, California
HFC Emission Factor2
RUNEX
(g/mi)
IDLEX
(g/trip)
STREX
(g/trip)
RUNEX
(g/mi)
IDLEX
(g/trip)
STREX
(g/trip)
RUNEX
(g/mi)
IDLEX
(g/trip)
STREX
(g/trip)
RUNEX
(g/mi)
Annual 1.54E+03 7.26E+02 0.00E+00 5.91E-04 1.49E-02 0.00E+00 2.43E-01 1.14E-01 0.00E+00 8.76E-04 Summer 1.54E+03 7.17E+02 0.00E+00 5.91E-04 1.58E-02 0.00E+00 2.43E-01 1.13E-01 0.00E+00 2.03E-03 Winter 1.54E+03 7.37E+02 0.00E+00 5.91E-04 1.37E-02 0.00E+00 2.43E-01 1.16E-01 0.00E+00 5.26E-05 Notes:
Abbreviations:CalEEMod® - California Emissions Estimator Model HHDT - Heavy Heavy-Duty Truck CH4 - methane IDLEX - idle exhaust
CO2 - carbon dioxide mi - mile
EMFAC - EMission FACtors model N2O - nitrous oxide
g - gram RUNEX - running exhaustGHG - greenhouse gas STREX - starting exhaustHFC - hydrofluorocarbon EMFAC
Vehicle
Class
Fuel
Type Season
1 Emission factors for Diesel HHDTs were obtained from the default EMFAC2021 output for Orange County - South Coast calendar year 2027. 2 Based on CalEEMod® defaults.
CO2 Emission Factors1 CH4 Emission Factors1 N2O Emission Factors1 HHDT Diesel
1315
Table C-3. Operational GHG Emission Factors for Warehouse Delivery Truck Transport Refrigeration Units Foothill Ranch Costco Project
Lake Forest, California
Transport Refrigeration Unit (TRU) Category Fuel Type
Total Statewide Activity 1
(hr/year)
Fuel Consumption 1
(gal/hr)
CO2 Emission Factor 1
(lbs/hr)
CH4 Emission Factor 2
(lbs/hr)
N2O Emission Factor
2 (lbs/hr)
Transport Refrigeration Unit - Instate Trailer Diesel 2,055,583 0.71 16 6.40E-04 1.25E-04 Transport Refrigeration Unit - Out-Of-State Trailer Diesel 1,186,175 0.68 15 6.14E-04 1.20E-04 16 6.30E-04 1.23E-04
Notes:
1 Total statewide activity, fuel consumption, and exhaust CO2 emission factors for TRUs were obtained from OFFROAD2021 emissions output for Orange (SC) sub-area calendar year 2027. 2 CH₄ and N₂O, emission factors were estimated based on fuel consumption obtained from OFFROAD2021 and USEPA emission factors in grams per gallon for stationary combustion of Distillate Oil No. 2.
USEPA GHG Emission Factors4
for Stationary Combustion of Distillate Oil No. 2:
CH4 Emission Factor 0.41 g/gal
N2O Emission Factor 0.08 g/gal
Abbreviations:
CH4 - methane hr - hour
CO2 - Carbon Dioxide equivalents lb - pound
g - gram N2O - nitrous oxide
gal - gallon SC - South Coast
GHG - greenhouse gas USEPA - United States Environmental Protection Agency Weighted Average Emission Factor 3
3 The activity weighted average emission factors for TRUs servicing the proposed Project were calculated using the emission factors and total statewide activity for each individual TRU category. 4 Obtained from USEPA Emission Factors for Greenhouse Gas Inventories. Available at:
https://www.epa.gov/system/files/documents/2025-01/ghg-emission-factors-hub-2025.pdf. Accessed: July 2025.
Item: 11
1316
Table C-4. Greenhouse Gas Emission Estimates for Transport Refrigeration Units Foothill Ranch Costco ProjectLake Forest, California
Mobile Source Activity
Annual TRU
Operational
Duration 1
(min/yr)
CO2
Emissions 2
(MT/yr)
CH4
Emissions 2
(MT/yr)
N2O
Emissions 2
(MT/yr)
Total GHG
Emissions 3,4
(MT CO2e/yr)
TRUs for Warehouse Delivery Trucks 248,716 29.4 0.001 0.000 29.5Notes:
Global Warming Potentials4: CO2 1
CH4 28
N2O 298
TRU Trip Information:
On-Site Operational Time During Truck Idling 5,6 15 minutes/round trip per TRU On-Site Truck Travel Distance 7 0.7 miles/round trip
On-Site Average Truck Travel Speed 8 5 miles/hour
On-Site Operational Time During Truck Travel 9 8.8 minutes/round trip per TRU Off-Site Truck Travel Distance 7 73.3 miles/round trip
Off-Site Average Truck Travel Speed 8 30 miles/hour
Off-Site Operational Time During Truck Travel 9 147 minutes/round trip per TRU Total Operational Time 10 170.4 minutes/TRU
Daily Number of TRUs 11 4 TRUs/day
Annual Number of TRUs 11 1,460 TRUs/year
Abbreviations:
AR4 - Fourth Assessment ReportATCM - Airborne Toxic Control MeasureCARB - California Air Resources BoardCH4 - methane CO2 - carbon dioxide
CO2e - carbon dioxide equivalentGHG - greenhouse gasIPCC- Intergovernmental Panel on Climate Changemin - minuteMT - metric tonN2O - nitrous oxide TRU - transport refrigeration unitUSEPA - United States Environmental Protection Agencyyr - year 2 TRU emissions were estimated using emission factors from Table C-3 and the annual TRU operational duration.1 Annual TRU operational duration is estimated based on total operational time per TRU and the number of TRUs per year, as provided in the TRU Trip Information below.
3 Total GHG emissions are presented as CO2e, which include CO2, CH4, and N2O emissions, weighted by their respective 100-year global warming potentials (IPCC AR4 Assessment). This aligns with the default used within CalEEMod. 9 The on-site and off-site TRU operational time during warehouse delivery truck travel was calculated by dividing the on-site and off-site truck travel distances by their corresponding average truck travel speeds, respectively. 10 The total operational time per TRU includes the operational time per round trip during on-site and off-site truck travel and on-site truck idling.11 The number of TRUs per day is based on Project-specific information. The total number of TRU uses per year was estimated by multiplying the daily number of TRUs by 365 operational days per year.
4 Obtained from USEPA Emission Factors for Greenhouse Gas Inventories. Available at:
https://www.epa.gov/system/files/documents/2025-01/ghg-emission-factors-hub-2025.pdf. Accessed: August 2025. 5 The idle duration per round trip is assumed to be 15 minutes (maximum 5 minutes at project site entry, maximum 5 minutes at loading dock, and maximum 5 minutes at project site exit), consistent with the CARB Air Toxic Control Measure to Limit Diesel-Fueled Commercial Motor Vehicle Idling. Available at https://ww2.arb.ca.gov/our-work/programs/atcm-to-limit-vehicle-idling/about. Accessed: August 2025. 6 The on-site TRU operational time during truck idling is assumed to be 15 minutes as described in footnote 5. TRUs will not idle for more than 5 minutes at the dock while unloading goods at the warehouse. 7 The on-site warehouse delivery truck travel distance was estimated based on the proposed Project site layout. The off-site warehouse delivery truck travel distance was calculated by subtracting the on-site travel distance from the total trip length for the warehouse delivery truck. 8 The on-site and off-site average truck travel speed are consistent with CARB's assumptions in Appendix I of the Proposed Amendments to the ATCM Measure for In-Use Diesel-Fueled TRU and TRU Generator Sets, and Facilities Where TRUs Operate. Available at: https://ww2.arb.ca.gov/sites/default/files/barcu/board/rulemaking/tru2021/appi.pdf. Accessed: August 2025.
1317
Table C-5. Emergency Generator GHG Emission Factors
Costco Foothill Ranch
Lake Forest, California
Equipment Type
CO2
1 (g/bhp-hr)
CH4
1 (g/bhp-hr)
N2O2,3
(g/bhp-hr)
Emergency Generator - CNG (0-500 HP) 349 0.73 7.00E-04
Constants:
Conversion factor3 3.1752 g/hp-hr per lb/MMBtu
Notes:
1 Based on CalEEMod® defaults.
2 In the absence of a CalEEMod® default, the N2O emission factor for natural gas fuel was referenced from the USEPA Emission Factors for Greenhouse Gas Inventories. Available at:
https://www.epa.gov/system/files/documents/2025-01/ghg-emission-factors-hub-2025.pdf. Accessed:
September 2025.
3 The conversion from the source emission factor in lb/MMBtu to an emission factor in g/bhp-hr for a natural gas emergency generator is referenced from CalEEMod® Appendix C. Available at:
https://caleemod.com/documents/user-guide/04_Appendix%20C.pdf. Accessed: September 2025.
Abbreviations:
bhp-hr - brake horsepower- hour
CalEEMod® - California Emissions Estimator Model
CH4 - methane
CNG - compressed natural gas
CO2 - carbon dioxide
g - gram
GHG - greenhouse gases
HP - horsepower
hp-hr - horsepower-hour
lb - pound
MMBtu - million British thermal unit
N2O - nitrous oxide
USEPA - United States Environmental Protection Agency
Item: 11
1318
APPENDIX D
PROJECT ANALYSIS AGAINST RELEVANT PLANS
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1319
List of Tables
Table D-1: CARB’s 2022 Scoping Plan Update - Project Analysis Table D-2: Connect SoCal 2024 (Regional Transportation Plan/Sustainable Communities Strategy) - Project Analysis
Table D-3: Lake Forest General Plan - Project Analysis
DRAFT Foothill Ranch Costco Project
Greenhouse Gas Emissions Technical Report
Lake Forest, California
Item: 11
1320
Table D-1. CARB’s 2022 Scoping Plan Update - Project Analysis Costco Foothill Ranch
Lake Forest, California
DRAFT
Priority Areas Priority GHG Reduction Strategies Does it Conflict? Convert local government fleets to ZEVs and provide EV charging at public sites
Create a jurisdiction-specific ZEV ecosystem to support deployment of ZEVs statewide (such as building standards that exceed state building codes, permit streamlining, infrastructure siting, consumer education, preferential parking policies, and ZEV readiness plans) Reduce or eliminate minimum parking standards
Implement Complete Streets policies and investments, consistent with general plan circulation element requirements
Increase access to public transit by increasing density of development near transit, improving transit service by increasing service frequency, creating bus priority lanes, reducing or eliminating fares, microtransit, etc.
Increase public access to clean mobility options by planning for and investing in electric shuttles, bike share, car share, and walking Implement parking pricing or transportation demand management pricing strategies
Amend zoning or development codes to enable mixed-use, walkable, transit-oriented, and compact infill development (such as increasing the allowable density of a neighborhood)
Preserve natural and working lands by implementing land use policies that guide development toward infill areas and do not convert “greenfield” land to urban uses (e.g., green belts, strategic conservation easements)
Does Not Conflict. Although this goal is not the responsibility of an individual commercial development project, according to the Project's Traffic Assessment, the Project will result in a net negative VMT impact, therefore supporting the VMT reduction priority area of the Scoping Plan. Furthermore, the Project is located on parcels that are zoned for mixed use in a region that is adjacent to existing infrastructure and development. The Project is expected to serve the existing population of the area by providing more convenient access to Costco services. The Project will be located in a central location and will allow customers to have multiple needs served in one trip, including but not limited to: eye exams, purchase of household goods and groceries, and tire service.
Transportation
Electrification
VMT Reduction
Does Not Conflict. Although this goal is not the responsibility of an individual commercial development project, the Project will include 12 DCFC EV stations (including 2 accessible stalls), and one level 2 charger which will provide Costco members with convenient EV charging at a lower cost.
Item: 11
1321
Table D-1. CARB’s 2022 Scoping Plan Update - Project Analysis Costco Foothill Ranch
Lake Forest, California
DRAFT
Priority Areas Priority GHG Reduction Strategies Does it Conflict? Adopt all-electric new construction reach codes for residential and commercial uses
Adopt policies and incentive programs to implement energy efficiency retrofits for existing buildings, such as weatherization, lighting upgrades, and replacing energy-intensive appliances and equipment with more efficient systems (such as Energy Star-rated equipment and equipment controllers)
Adopt policies and incentive programs to electrify all appliances and equipment in existing buildings such as appliance rebates, existing building reach codes, or time of sale electrification ordinances Facilitate deployment of renewable energy production and distribution and energy storage on privately owned land uses (e.g., permit streamlining, information sharing)
Deploy renewable energy production and energy storage directly in new public projects and on existing public facilities (e.g., solar photovoltaic systems on rooftops of municipal buildings and on canopies in public parking lots, battery storage systems in municipal buildings)
Notes:
Abbreviations:
CARB - California Air Resources Board
DCFC - direct current fast charging
EV - electric vehicle
GHG - greenhouse gas
VMT - vehicle miles traveled
ZEV - zero emission vehicle
1 Priority areas and GHG reduction strategies obtained from 2022 CARB Scoping Plan Update, Appendix D, Local Actions. Available at:
https://ww2.arb.ca.gov/sites/default/files/2022-11/2022-sp-appendix-d-local-actions.pdf. Accessed: September 2025.
Building
Decarbonization
Does Not Conflict. Although this goal is not the responsibility of an individual commercial development project, the Project would meet the CalGreen Building Standards Code in effect at the time of building permit application, which would include a number of energy saving requirements. Additionally, the Project includes a number of energy saving requirements, which would lead to GHG savings as well, which are outlined in Section 5.2.1 of the GHG Technical Report. Finally, the Project would include solar panels which would provide renewable energy to the Project and further reduce the GHG emissions associated with the building energy.
Item: 11
1322
Table D-2. Connect SoCal 2024 (Regional Transportation Plan/Sustainable Communities Strategy) - Project Analysis Costco Foothill Ranch
Lake Forest, California
DRAFT
Regional Planning Policy Area1 Policy Number1 Regional Planning Policy1 Does it Conflict? 3 Pursue the development of Complete Streets that comprise a safe, multi modal network with flexible use of public rights-of-way for people of all ages and abilities using a variety of modes (e.g., people walking, biking, rolling, driving, taking transit) 5 Facilitate the implementation of Complete Streets and curb space management strategies that accommodate and optimize new technologies, micromobility devices and first/last mile connections to transit and last-mile delivery 7 Encourage and support the implementation of projects, both physical and digital, that facilitate multimodal connectivity, prioritize transit and shared mobility, and result in improved mobility, accessibility and safety
9 Encourage and support the implementation of projects, both physical and digital, that facilitate multimodal connectivity, prioritize transit and shared mobility, and result in improved mobility, accessibility and safety
Transportation System
Management 12
Pursue efficient use of the transportation system using a set of operational improvement strategies that maintain the performance of the existing transportation system instead of adding roadway capacity, where possible 32 Promote the growth of origins and destinations, with a focus on future housing and population growth, in areas with existing and planned urban infrastructure that includes transit and utilities
Does Not Conflict. The proposed Project will be located in the Foothill Ranch Towne Center Shopping mall, which consists of existing urban infrastructure. The new warehouse will provide nearby residential areas with more convenient access to Costco services, including eye exams, purchases of household goods and groceries, and tire services. 33 Promote the growth of origins and destinations, in areas with a proclivity toward multi modal options like transit and active transportation, to reduce single occupant vehicle (SOV) dependency and vehicle miles traveled
34 Seek to realize scale economies or a critical mass of jobs and destinations in areas across the region that can support non-SOV options and shorter trip distances, combined trips and reduced vehicle miles traveled
15-Minute Communities 42
Promote 15-minute communities as places with a mix of complementary land uses and accessible mobility options that align with and support the diversity of places (or communities) across the region. These are communities where residents can either access their most basic, day-to-day needs within a 15-minute walk, bike ride or roll from their home or as places that result in fewer and shorter trips because of the proximity of complementary land uses
Does Not Conflict. The proposed Project is expected to serve the existing population of the area by providing more convenient access to Costco services. The Project will be located in a central location that is within a 15-minute walk of the nearest apartment complexes and will allow customers to have multiple needs served in one trip, including but not limited to: eye exams, purchase of household goods and groceries, and tire service. 48 Promote sustainable development and best practices that enhance resource conservation, reduce resource consumption and promote resilience 49 Support communities across the region to advance innovative sustainable development practices
50 Recognize and support the diversity of communities across the region by promoting local place-making, planning and development efforts that advance equity, mobility, resilience and sustainability
51 Reduce hazardous air pollutants and greenhouse gas emissions and improve air quality throughout the region through planning and implementation efforts 52 Support investments that reduce hazardous air pollutants and greenhouse gas emissions
53 Reduce the exposure and impacts of emissions and pollutants and promote local and regional efforts that improve air quality for vulnerable populations, including but not limited to Priority Equity Communities and the AB 617 Communities Does Not Conflict. The proposed Project is located near the Bake-Towne Centre bus stop and is within walking/biking/rolling distance of multiple apartment complexes, as well as other shops in the Foothill Ranch Towne Center Shopping mall, therefore promoting multiple transit options which would reduce peak-hour vehicle trips, and will create new employment opportunities in the region. Additionally, the Project would include bicycle parking as well which would further support the use of a variety of modes of transportation for employees commuting to work.
The proposed Project is expected to serve the existing population of the area by providing more convenient access to Costco services. The Project will be located in a central location and will allow customers to have multiple needs served in one trip, including but not limited to: eye exams, purchase of household goods and groceries, and tire service.
Does Not Conflict. Although this policy is not applicable to an individual project, the Greenhouse Gas Technical Report demonstrates less than significant impacts, thus, the Project will not conflict with the implementation GHG reduction plans. The Project includes sustainability design elements, as listed in Section 5.2.1.
Environment: Create a healthy region for the people of today and tomorrow Sustainable Development
Air Quality
Does Not Conflict. The proposed Project will reduce energy consumption by incorporating sustainable design features and systems with enhanced energy efficiencies meeting State and federal code requirements. The Project's proposed architectural design fits within the Development Guidelines and incorporates sustainable, recyclable, durable and low maintenance materials and design elements. Please see Section 5.2.1 of the GHG Technical Report for a full list of the energy-saving sustainability design features of the proposed Project.
Mobility: Build and maintain an integrated multimodal transportation network Complete Streets
Transit and Multimodal
Integration
Priority Development Areas
Communities: Develop, connect and sustain livable and thriving communities Does Not Conflict. The proposed Project will be located nearing existing residential areas, will be located near a bus stop, and will include bicycle parking. Therefore, the Project would provide retail and jobs near a housing-rich area served by the Orange County Transportation Authority.
Item: 11
1323
Table D-2. Connect SoCal 2024 (Regional Transportation Plan/Sustainable Communities Strategy) - Project Analysis Costco Foothill Ranch
Lake Forest, California
DRAFT
Regional Planning Policy Area1 Policy Number1 Regional Planning Policy1 Does it Conflict? 54 Accelerate the deployment of a zero-emission transportation system and use near-zeroemission technology to offer short-term benefits where zero-emissions solutions are not yet feasible or commercially viable
55 Promote equitable use of and access to clean transportation technologies so that all may benefit from them
58 Prioritize the climate mitigation, adaptation, resilience and economic benefits of natural and agricultural lands in the region
61 Encourage the protection and restoration of natural habitat and wildlife corridors 62 Encourage the conservation and viability of agricultural lands to protect the regional and local food supply and ensure the sustainability of local agriculture as a vital part of the region’s economy
65 Support local and regional climate and hazard planning and implementation efforts for transportation, land use, and other factors
Does Not Conflict. The proposed Project will incorporate storm water management plans to maintain quality control and storm water discharge rates. The Project will also enhance the area with a warehouse whose architecture is designed to be responsive to the City of Lake Forest's Community goals. According to the Project's Traffic Analysis, the Project will result in a net negative VMT impact. Lastly, the proposed Project includes a number of sustainability design element, which are described in detail in Section 5.2.1 of the GHG Technical Report.
67 Promote sustainable water use planning, practices and storage that improve regional water security and resilience in a drier environment
Does Not Conflict. The proposed Project's irrigation system will include the use of deep root watering bubblers for parking lot trees to minimize usage and ensure that water goes directly to the intended planting areas. The Project will include use of native species vegetation and drip irrigation systems to reduce potable water consumption, high-efficiency restroom fixtures for greater water savings, and storm water management plans to maintain quality control and storm water discharge waters. 70 Prioritize community and environmental justice concerns, together with economic needs, and support workforce development opportunities, particularly around deployment of zero-emission and clean technologies and their supporting infrastructure Does Not Conflict. The proposed Project will introduce a new Costco warehouse that serves the local community with goods and services from both nationally known businesses and regional and local businesses. It will enable patrons to travel shorter distances to access eye exams, purchase of household goods and groceries, and tire services, therefore reducing emissions from vehicle travel. Furthermore, the proposed Project will create new jobs in the region that are accessible via transit. 71 Explore and advance the transition toward zero-emission and clean technologies and other transformative technologies, where viable
Does Not Conflict. All Costco delivery trucks will be equipped with an engine idle shut off timer to reduce idling emissions.
Additionally, the Project will include 12 DCFC EV charging stations (including two accessible stalls), and one level 2 charger which will provide Costco members with convenient EV charging at a lower cost. 73 Ensure continued, significant investment in a safe, secure, clean and efficient transportation system—including both highways and rail—to support the intermodal movement of goods across the region
Does Not Conflict. The proposed Project is strategically located to minimize miles traveled for delivery.
Notes:
Abbreviations:
CalGreen - California Green Building Standards Code
DCFC - Direct Current Fast Charging
EV - Electric Vehicle
GHG - greenhouse gas
RTP/SCS - Regional Transportation Plan/Sustainable Communities Strategy SoCal - Southern California
VMT - vehicle miles traveled
Climate Resilience
Economy: Support a sustainable, efficient and productive regional economic environment that provides opportunities for all people in the region Goods Movement
1 SCAG. A Plan For A Brighter Future. Available at: https://scag.ca.gov/connect-socal. Accessed: September 2025.
Does Not Conflict. The proposed Project will be an infill development with construction occurring in a previously occupied commercial land parcel. The Project will not be constructed over any natural and agricultural lands or natural habitat and wildlife corridors.
Clean Transportation
Natural and Agricultural Lands
Preservation
Does Not Conflict. Although this policy is not applicable to an individual project, the Project will include 12 DCFC EV charging stations (including two accessible stalls), and one level 2 charger.
Environment: Create a healthy region for the people of today and tomorrow (Continued)
Item: 11
1324
Table D-3. Lake Forest General Plan - Project Analysis
Costco Foothill Ranch
Lake Forest, California
DRAFT
# Policy Does it Conflict?
RR-4.1
Regional Standards. Coordinate planning efforts with the South Coast Air Quality Management District (SCAQMD), Southern California Association of Governments (SCAG), and the California Air Resource Board (CARB) to meet local and regional air quality standards and ensure attainment of established goals.
Not Applicable. This policy addresses an air quality issue, and therefore is not applicable to a GHG assessment. However, the Project references the SCAQMD draft screening level (3,000 MT CO2e) as the GHG significance threshold for the Project. As noted in Section 5.1 of the GHG Technical Report, the Project will have a less than significant impact when compared to this SCAQMD screening level.
RR-4.2 Land Use Planning. Utilize land-use planning techniques to reduce traffic congestion and promote alternative modes of transportation for the community.
RR-4.3 Development. Encourage and incentivize the development of mixed-use residential opportunities and live-work environments within the City to lessen the impacts of traffic congestion on local air quality.
RR-4.4 Active Transportation. Improve active transportation options within the City by connecting local bikeways and trails to City bus stops and public transportation centers.
RR-4.5 Public Transit. Coordinate with the OCTA and actively pursue the improvement and expansion of public transit for Lake Forest residents.
RR-4.6 Sensitive Receptors. Insulate sensitive receptors from areas of heightened air quality pollution, including highways, by utilizing land use planning to buffer and protect residential areas. Not Applicable. This policy addresses an air quality issue, and therefore is not applicable to a GHG assessment.
RR-4.7 Mitigation. Require the implementation of relevant mitigation measures for all future development upon identification of potential air quality impacts.
Not Applicable. This policy addresses an air quality issue, and therefore is not applicable to a GHG assessment. However, the Project is less than significant for GHG as discussed in Section 5 of the GHG Technical Report and therefore there is no GHG significant impact.
Local Reduction Targets. The City of Lake Forest establishes the following per capita GHG reduction targets, in order to meet the requirements established by the state under AB 32 and SB 32, consistent with the CARB’s 2017 Scoping Plan:
• 3.99 MT CO2e per capita by 2030
• 2.66 MT CO2e per capita by 2040; and
• 1.33 MT CO2e per capita by 2050
RR-4.9 GHG Reduction. Consider and adopt new policies and programs that will help to provide energy efficient alternatives to fossil fuel use and reduce consumption in order to reduce greenhouse gas emissions.
Does Not Conflict. This is a policy that the City would implement rather than an individual project. However, the Project would include a number of energy saving requirements, which would lead to GHG reduction as well, which are outlined in Section 5.2.1 of the GHG Technical Report. Finally, the Project would include solar panels which would provide renewable energy to the Project and further reduce the GHG emissions associated with the building energy.
RR-4.10 Carbon Reduction. Expand the number of parks and trees in Lake Forest to provide a larger carbon sink or area containing natural sources that retain more carbon than what those sources emit.
Does Not Conflict. This is a policy that the City would implement rather than an individual project. The Project will include landscaped area as part of the design.
RR-4.11
Public Engagement. Promote regional air quality programs in order to inform the public on regional air quality concerns and encourage the engagement of all Lake Forest residents in future planning decisions related to air quality.
Not Applicable. This policy addresses an air quality issue, and therefore is not applicable to a GHG assessment.
RR-4 Policies
Does Not Conflict. This is a City-wide target and it is not applicable to an individual project. The significance thresholds are discussed in Section 3 of the GHG Technical Report and the Project is less than significant.
Does Not Conflict. The Project is located near the Bake-Towne Centre bus stop and is within walking/biking distance of multiple apartment complexes, as well as other shops in the Foothill Ranch Towne Center Shopping mall, therefore promoting alternative modes of transportation which would reduce peak-hour vehicle trips. The Project will be located in a central location that is within a 15-minute walk of the nearest apartment complexes and will allow customers to have multiple needs served in one trip, including but not limited to: eye exams, purchase of household goods and groceries, and tire service.
The Project would provide retail and jobs near a housing-rich area served by the Orange County Transportation Authority.
RR-4.8
Item: 11
1325
Table D-3. Lake Forest General Plan - Project Analysis
Costco Foothill Ranch
Lake Forest, California
DRAFT
RR-4 Policies
# Action Does it Conflict?
RR-4a
Review all new industrial and commercial development projects for potential air quality impacts to residences and other sensitive receptors. Ensure that mitigation measures and best management practices are implemented to reduce significant emissions of criteria pollutants.
Review development, infrastructure, and planning projects for consistency with SCAQMD requirements during the CEQA review process. Require project applicants to prepare air quality analyses to address SCAQMD and General Plan requirements, which include analysis and identification of:
1. Air pollutant emissions associated with the project during construction, project operation, and cumulative conditions.
2. Potential exposure of sensitive receptors to toxic air contaminants.
3. Significant air quality impacts associated with the project for construction, project operation, and cumulative conditions.
4. Mitigation measures to reduce significant impacts to less than significant or the maximum extent feasible where impacts cannot be mitigated to less than significant.
RR-4c Work with Orange County and the South Coast Air Quality Management District to implement programs aimed at improving regional air quality. Not Applicable. This action addresses an air quality issue, and therefore is not applicable to a GHG assessment.
RR-4d
Continue to review development projects to ensure that all new public and private development complies with the California Code of Regulations (CCR), Title 24 standards as well as the energy efficiency standards established by the Lake Forest Municipal Code.
Does Not Conflict. This is an action that the City would implement rather than an individual project, however the Project would meet the Title 24 in effect at the time of building permit application, which would include a number of energy saving requirements.
RR-4e
Monitor GHG emissions generated by the community over time for consistency with the established GHG reduction targets, and update the City’s community GHG Inventory every five years. In the event that the City determines that ongoing efforts to reduce GHG emissions are not on track to meet the City’s adopted GHG reduction targets, the City shall establish and adopt new and/or revised GHG reductions measures that will effectively meet the established GHG reduction targets.
Does Not Conflict. This is an action that the City would implement rather than an individual project, however the Project will not conflict with the City's ability to adopt new and/or revised GHG reductions measures.
RR-4f
Provide the necessary facilities and infrastructure to facilitate the use of City-owned low or zero emission vehicles such as electric vehicle charging facilities and conveniently located alternative fueling stations at key City facilities as operations necessitate and/or as funding becomes available.
Does Not Conflict. Although this policy is not applicable to an individual project, the Project will install 12 DCFC electric vehicle chargers (including 2 accessible stalls), and one level 2 charger.
RR-4g
Evaluate and consider multi-modal transportation benefits to all City employees, such as free or low-cost monthly transit passes. Encourage employer participation in similar programs. Encourage new transit/shuttle services and use.
Does Not Conflict. The Project plans to encourage employee commute trip reduction through a variety of strategies. The Project will provide rideshare information to employees, carpool and vanpool parking, and bicycle storage and locker rooms for employees who bike to work. This will provide incentives for employees to commute to work in alternative ways, which could lead to employee VMT reductions.
RR-4h Evaluate and consider the feasibility of allowing private bicycle rental companies to operate in Lake Forest.
RR-4i Encourage community car-sharing and carpooling.
RR-4j Support the establishment and expansion of a regional network of electric vehicle charging stations and encourage the expanded use of electric vehicles.
RR-4k
Establish and adopt standards and requirements for electric vehicle parking, including minimum requirements for the installation of electric vehicle charging stations in new multi-family residential and commercial, office, and light industrial development.
Not Applicable. These actions address air quality issues, and therefore are not applicable to a GHG assessment. However, the Project is less than significant for GHG, as discussed in Section 5 of the GHG Technical Report, which includes discussion of the Project inventory against the SCAQMD draft screening level (3,000 MT CO2e).
RR-4b
Does Not Conflict. This is an action that the City would implement rather than an individual project, however the Project would not conflict with the City's ability to implement this measure.
Does Not Conflict. The Project will include 12 DCFC electric vehicle chargers (including 2 accessible stalls), and one level 2 charger.
Item: 11
1326
Table D-3. Lake Forest General Plan - Project Analysis
Costco Foothill Ranch
Lake Forest, California
DRAFT
RR-4 Policies
# Action Does it Conflict?
RR-4l Periodically review and update the City’s Green Building Program to reflect best practices, such as encouraging the use of cement substitutes and recycled building materials for new construction.
RR-4m
Update the City’s Green Building Program to promote the reduction of urban heat islands through vegetation management and cool surfaces. Encourage multi-family residential and nonresidential development to increase the use of higher-albedo materials for surfaces including roofs, parking areas, driveways, roads, and sidewalks.
Encourage developments with parking lot areas to shade these areas with vegetation or solar panels when appropriate. Support various programs to plant and maintain trees, which can also contribute to a reduction of urban heat islands.
Future development projects implemented under the General Plan will be required to demonstrate consistency with SCAQMD construction emission thresholds. Where emissions from individual projects exceed SCAQMD thresholds, the following actions shall be incorporated as necessary to minimize impacts. These measures do not exclude the use of other, equally effective mitigation measures.
• Require all off-road diesel equipment greater than 50 horsepower (hp) used for this Project to meet USEPA Tier 4 final off-road emission standards or equivalent. Such equipment shall be outfitted with Best Available Control Technology (BACT) devices
including a California Air Resources Board Certified Level 3 Diesel Particulate Filter (DPF) or equivalent. This DPF will reduce diesel particulate matter and NOx emissions during construction activities • Require a minimum of 50 percent of construction debris be diverted for recycling. • Require building materials to contain a minimum 10 percent recycled content. • Require materials such as paints, primers, sealants, coatings, and glues to have a low volatile organic compound concentration compared to conventional products. If low VOC materials are not available, architectural coating phasing should be extended sufficiently to reduce the daily emissions of VOCs.
RR-4n
Does Not Conflict. These actions address a mix of air quality and GHG issues. The Project is less than significant for GHG, as discussed in Section 5 of the GHG Technical Report, which includes discussion of the Project inventory compared to the SCAQMD draft screening level (3,000 MT CO2e). Out of the four examples provided, the second and third bullets are the most relevant to GHG, and the Project will include design features that touch on these items. See below for a summary of the relevant design features of the Project:
• Construction waste is recycled whenever possible.
• Main Building structure is a pre-engineered system that uses 100% recycled steel materials and is designed to minimize the amount of material utilized.
• Roof material is recycled standing seam metal panel, designed to maximum efficiency for spanning the structure.
Note, the Project includes additional sustainability design elements, which are listed in Section 5.2.1 of the GHG Technical Report.
Does Not Conflict. This is an action that the City would implement rather than an individual project. For new buildings, Costco uses pre-manufactured metal wall panels with insulation carry a higher R-Value and greater solar reflectivity to help conserve energy. Costco also uses a reflective cool roof material to produce lower heat absorption and thereby lowering energy requirements during the hot summer months. This roofing material meets the requirements for the EPA’s Energy Star energy efficiency program. Additionally, the Project will include landscaped area and solar panels, which will shade the parking lot areas as well.
Item: 11
1327
Table D-3. Lake Forest General Plan - Project Analysis
Costco Foothill Ranch
Lake Forest, California
DRAFT
RR-4 Policies
# Action Does it Conflict?
Future development projects implemented under the General Plan will be required to demonstrate consistency with SCAQMD’s operational emission thresholds. For projects where operational emissions exceed regulatory thresholds, the following measures may be used to reduce impacts. Note the following measures are not all inclusive and developers have the option to add or substitute measures that are equally or more appropriate for the scope of their project.
• Develop a project specific TDM program for residents and/or employees that provides opportunities for carpool/vanpools.
• Provide onsite solar/renewable energy in excess of regulatory requirements. • Require that owners/tenants of non-residential or multi-family residential developments use architectural coatings that are 10 grams per liter or less when repainting/repairing properties. • Require dripless irrigation and irrigation sensor units that prevent watering during rain storms. • Ensure all parking areas are wired for capability of future EV charging and include EV charging stations that exceed regulatory requirements.
Notes:
Abbreviations:
AB - Assembly Bill MT - metric ton
BACT - Best Available Control Technology NOx
- nitrogen oxide compounds (NO + NO2)
CalGreen - California Green Building Standards Code OCTA - Orange County Transportation Authority CARB - California Air Resources Board PM10 - particulate matter less than 10 microns in diameter CCR - California Code of Regulations PM2.5 - particulate matter less than 2.5 microns in diameter CEQA - California Environmental Quality Act RR - Recreation and Resources CO - carbon monoxide SB - Senate Bill
CO2e - carbon dioxide equivalent SCAG - Southern California Association of Governments DCFC - Direct Current Fast Charging SCAQMD - South Coast Air Quality Management District DPF - Diesel Particulate Filter SOX - sulfur oxides
EPA - Environmental Protection Agency TDM - transportation demand management EV - electric vehicle USEPA - United States Environmental Protection Agency GHG - greenhouse gas VMT - vehicle miles traveled
hp - horsepower VOC - volatile organic compound
RR-4o
Does Not Conflict. The Greenhouse Gas Technical Report demonstrates less than significant impacts, and therefore additional measures will not be required to be implemented. The Project is less than significant for GHG, as discussed in Section 5 of the GHG Technial Report, which includes discussion of the Project inventory compared to the SCAQMD draft screening level (3,000 MT CO2e). However, the Project will include a number of the suggested measures, including the following. Please note that only the GHG-related measures are addressed below.
• The Project plans to encourage employee commute trip reduction through a variety of strategies. The Project will provide rideshare information to employees, carpool and vanpool parking, and bicycle storage and locker rooms for employees who bike to work. This will provide incentives for employees to commute to work in alternative ways, which could lead to employee VMT reductions.
• The Project will include on-site solar renewable energy generation. • The Project's irrigation system includes the use of deep root watering bubblers for parking lot trees to minimize usage and ensure that water goes directly to the intended planting areas. • The Project will include 12 DCFC electric vehicle chargers (including 12 accessible stalls), and one level 2 charger.
Note, the Project includes additional sustainability design elements, which are listed in Section 5.2.1 of the GHG Technical Report.
1 Policies and actions for Goal RR-4: Air Quality and Greenhouse Gas Emissions was referenced from the City of Lake Forest General Plan, adopted June 2020. Available at:
https://www.lakeforestca.gov/departments/community_development/planning/plans_and_standard_guidelines.php#undefined. Accessed: September 2025.
Item: 11
1328
Costco Wholesale Project
CEQA Guidelines 15183 | Environmental Compliance Checklist Appendix F
Appendix F – Hydrology Report
Item: 11
1329
Preliminary Hydrology & Hydraulics
Report
for
SDP 05-25-5800
Costco Foothill Ranch
26602 Town Center Drive,
Foothill Ranch, CA 92610
NOVEMBER 2025
PREPARED FOR:
Costco Wholesale
9 Corporate Park, Suite 230
Irvine, CA 92606
PREPARED BY:
1100 Town and Country Road, Suite 700
Orange, CA 92868
(714) 705-1364
Copyright © 2025 Kimley-Horn and Associates, Inc.
KHA Project # 094169109
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
Item: 11
1330
2 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Contents
Introduction .................................................................................................................................4 Project Description......................................................................................................................4 Location ......................................................................................................................................4 Methodology ...............................................................................................................................5 Precipitation................................................................................................................................ 6 FEMA Mapping ........................................................................................................................... 6 Soil Types................................................................................................................................... 6 Groundwater............................................................................................................................... 6 Infiltration.................................................................................................................................... 6 Factor of Safety........................................................................................................................... 7 Pre-development Condition......................................................................................................... 7 Post-Development Condition....................................................................................................... 7 Stormwater Mitigation .................................................................................................................8 Hydraulic Analysis.......................................................................................................................8 Conclusion..................................................................................................................................8 Appendices
Appendix A - Rainfall Data ..........................................................................................................9 Appendix B - FIRM MAP...........................................................................................................10 Appendix C – Soils Information .................................................................................................11 Appendix D - Existing and Proposed Drainage Maps ................................................................12 Appendix E - Rational Method Analysis.....................................................................................13 Appendix F - Unit Hydrograph Analysis.....................................................................................14 Appendix G – Detention Basin Calculations ..............................................................................15 Appendix H – Hydraulic Calculations ........................................................................................16 Appendix I – Kleinfelder Drainage Report .................................................................................17 Item: 11
1331
3 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Tables
Table 1: Pre-Development Flows ................................................................................................7 Table 2: Post-Development Flows (Un-mitigated) .......................................................................7 Table 3: Proposed 100-year Final (Mitigated) Flows vs. Existing Flows ......................................8 Figures
Figure 1: Location Map ...............................................................................................................5 Item: 11
1332
4 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
INTRODUCTION
Kimley-Horn and Associates has been retained to prepare a Preliminary Hydrology Report for the proposed Costco Foothill Ranch store in the City of Lake Forest, California. The purpose of this report is to demonstrate preliminary analysis of the hydrologic and hydraulic conditions associated with the development of the project site. To do so, the following is the scope of this report:
Discuss the pre-development discharge patterns and points. Discuss the post-development discharge patterns and points. Determine the pre-development onsite flow rates for the 100-year event. Determine the post-development un-mitigated flow rates for the 100-year event. Determine required post-development onsite mitigation for the 100-year event to be less than or equal to the pre-development 100-year event.
Even though this report discusses stormwater, this report is not a Stormwater Pollution Prevention Plan (SWPPP), a Groundwater Study, a Geotechnical Report, nor a Water Quality Management Plan (WQMP).
Each of these separate reports discusses separate aspects of stormwater. Portions of the Geotechnical Report are utilized and referenced for the purpose of this report. Similarly, the requirements of the WQMP are considered for the stormwater mitigation and sizing of outlet structures for this project.
PROJECT DESCRIPTION
The existing developed area will be developed into the proposed Costco Foothill Ranch store. The project site is within the influence of the City of Lake Forest, within Northern Orange County. The project site encompasses Parcel 1 P.M. NO. 96-100 and P.M.B. 297/43-48. The APN for the project site is 612-093-
13. The project property encompasses approximately 15.93 acres. Only 90% of the site will be re-developed due to the north end of the property to be dedicated to the adjacent businesses.
The proposed project consists of the proposed Costco Warehouse building, with the associated parking lot and directly adjacent frontage improvements. The total building square footage is anticipated to be approximately 161,295 square feet. The associated improvements include, but are not limited to, onsite grading, domestic water service, sanitary sewer service, storm drain infrastructure, concrete and asphalt pavement, landscaping, and irrigation. The proposed building use will be commercial. Daily routine site activities will consist of customers entering the Costco Warehouse building and employees walking through the parking lot areas to retrieve shopping carts. Two trash compactors will be provided onsite. The site will include approximately 44,649 square feet of landscaping. The site is currently developed as 94% impervious and 6% pervious. Once the site is developed, the site will be 93% impervious and 7% pervious.
The proposed site will mostly drain south and be captured by onsite grate inlets, which then will be routed to be treated by EcoStream. From there the water will then be routed to a detention basin where overflow will be connected to the existing storm drain system.
LOCATION
The site is located northwest of the intersection of Towne Center Dr and Market (Private Road) in the City of Lake Forest, Orange County. The project site is bordered by the Private Road to the North, HWY 241 to the west, a developed town center to the south, and small businesses to the east.
Item: 11
1333
5 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
FIGURE 1: LOCATION MAP
METHODOLOGY
The design criteria for the hydrologic calculations for this project have been conducted per requirements as outlined in the Orange County Hydrology Manual (October 1986).
Runoff calculations were performed using the Rational Method as utilized by the HydroWin Advanced Engineering Software, (AES). AES was used to estimate time of concentrations and 100-year peak flow rates generated from the pre- and post-development conditions. These Rational Method calculations are included in this report as Appendix E. Curve numbers were established from Figures C-3 and C-4 of the Hydrology Manual. Intensity values were obtained from the National Oceanic and Atmospheric Administration (NOAA). Loss rates were calculated using equations E.4 and E.5 of the Hydrology Manual.
Volume calculations were performed using the small unit hydrograph method through the AES software, and the results are included in Appendix F. This method calculates a unit hydrograph using time of concentration, maximum watershed loss rates, low lost fraction and an S-graph as specified in the Hydrology Manual. The time of concentration was determined from the Rational Method analysis in AES.
The maximum watershed loss rate was obtained directly from the unit hydrographs that were prepared using the methodology described in Section E of the Hydrology Manual in AES.
Item: 11
1334
6 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
PRECIPITATION
According to NOAA Atlas 14, the following are the precipitation values that have been utilized for our study:
100-year storm 5-minute point rainfall (inches) = 0.44
100-year storm 30-minute point rainfall (inches) = 1.08 100-year storm 1-hour point rainfall (inches) = 1.52
100-year storm 3-hour point rainfall (inches) = 2.85
100-year storm 6-hour point rainfall (inches) = 4.10
100-year storm 24-hour point rainfall (inches) = 7.26
See Appendix A, for project location rainfall maps from NOAA Atlas 14.
FEMA MAPPING
The site is located in Zone X-unshaded per the Federal Emergency Management Administration (FEMA) Flood Insurance Rate Map (FIRM) panel 06059C0316J, dated December 3, 2009. Flood Zone X-unshaded is defined by FEMA to have minimal flood hazard. For reference, see Appendix B, FIRM Map.
SOIL TYPES
The type of soil and soil conditions are major factors affecting infiltration/detention and resultant storm water runoff. The Natural Resources Conservation Service (NRCS) has classified soil into one general hydrologic soil groups for comparing infiltration and runoff rates. Each group is based on properties that influence runoff, such as water infiltration rate, texture, natural discharge, and moisture condition. The runoff potential is based on the amount of runoff at the end of a long duration storm that occurs after wetting and swelling of the soil not protected by vegetation. Using the United States Department of Agriculture Natural Resources Conservation Service Web Soil Survey online tool and the Stormwater Facility Mapping online tool for Orange County, it was determined the hydrologic soil group classification is A. Soil group A is defined as soils having good infiltration rates (low runoff potential). These soils have a good rate of water transmission.
Based on the Percolation Test, from Kleinfelder, it was concluded that infiltration is deemed to be infeasible due to low percolation rates. Based on borings and percolation tests, fill soils were not encountered. The design infiltration rate in the soils closest to the location of the proposed underground infiltration system is
0.02 inches/hour, without a factor of safety. See Appendix B for the Web Soil Survey Report and Appendix C for the Geotechnical Reports.
GROUNDWATER
Per the Draft Geotechnical Investigation Report prepared by Kleinfelder, groundwater was not encountered during the maximum depth explored of approximately 49 ½ feet.
INFILTRATION
Kleinfelder performed four percolation tests in general accordance with the Orange County Technical Guidance for Water Quality Management Plans using shallow boring percolation test methods (falling head). Tests were performed at depths of approximately 3 and 10 feet borings. The infiltration rate was deemed infeasible due to low rates.
Item: 11
1335
7 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
FACTOR OF SAFETY
The factor of safety was determined based on Worksheet H, the Factor of Safety and Design Infiltration Rate and Worksheet from the Water Quality Management Plan. The combined safety factor is determined from the product of the Suitability Assessment Safety Factor (Factor A) and the Design Factor (Factor B).
The combined safety factor was determined to be 4.4 and then applied to the measured infiltration rate.
Infiltration was deemed unfeasible due to low rates. Factor of safety calculations have been provided for reference in Appendix C.
PRE-DEVELOPMENT CONDITION
The site is currently 100% developed. The existing site generally sheet flows in a southernly direction, where they are captured by on-site catch basins. The existing site consist of 4 drainage areas, DA-A, DAB, DA-C, and DA-D which encompasses the entire site. The entire site drains southernly. All runoff is captured into the existing underground storm drain system where it ultimately drains to Serrano Creek.
Table 1 shows the summary of the pre-development flows for the onsite drainage areas. See Appendix D for the Existing Drainage Map and Appendix E for the rational method calculations.
Table 1: Pre-Development Flows
POST-DEVELOPMENT CONDITION
The grading for the proposed site will maintain the natural flow pattern of the existing site to the maximum extent practicable. This analysis was done for the 2, 10, 100-year storm events. In the proposed conditions, the project site was split into DMA A and B leading to 1 underground detention system.
Drainage from this DMA will flow into an underground EcoStreams for treatment and then routed into a detention basin and sent to the existing onsite storm drain system.
Table 2: Post-Development Flows (Un-mitigated)
Drainage Area Drainage
Area (AC)
Time of
Concentration
(min)
Q2 (cfs) Q100 (cfs)
DA A 1.51 6.40 2.58 7.04
DA B 6.47 8.82 9.25 25.28
DA C 3.94 7.39 5.68 15.54
DA D 4.01 18.01 3.90 10.64
Total 15.93 - 21.41 58.50
Drainage Area Drainage Area
(AC)
Time of
Concentration (min) Q2 (cfs) Q100 (cfs)
A1 2.83 7.68 4.45 12.26
A2 1.65 5.78 2.76 7.61
A3 2.37 5.64 4.65 18.78
A4 4.48 8.44 7.15 20.47
A5 0.34 9.81 0.58 1.61
A6 1.30 5.10 2.54 6.99
A7 2.96 11.12 3.90 11.22
TOTAL 15.93 14.6 22.13 63.54
Item: 11
1336
8 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
STORMWATER MITIGATION
For proposed onsite flows, stormwater mitigation is needed to ensure the proposed flows do not negatively impact the existing downstream drainage facilities. The underground detention system will serve to meet the water quality requirements and mitigate peak flow. To mitigate the increased flows an underground detention basin is proposed. The basin’s outlet structure is intended to restrict peak flows into the proposed conditions to level equal to or less than the existing flows.
The outlet structure consists of 24” orifice at the bottom of the system and is connected to the proposed detention system located towards the south of the site. The system was modeled in AutoCad Civil3D Hydrograph extension. Based on the basin routing analysis for the 2-, 10-, 100-year storm events, the highest routed (mitigated) onsite outflows from the underground detention system result in proposed flows that are less than the allowable flow rate for the project site. Water will exit out of the control structure through the outlet and connect to a proposed storm drain located offsite. Refer to Appendix G for AutoCad Civil3D hydrograph extension results showing mitigated flows.
Per the design of the Advanced Drainage Systems (ADS) MC-3500 with footprint 45.5’ x 22.9’ with 24” orifice which serves to detail peak flows prior to being discharged to existing storm drain system.
See below table and exhibits for more information along with Appendix G for calculations.
Table 3: Proposed 100-year Final (Mitigated) Flows vs. Allowable Flow
HYDRAULIC ANALYSIS
The calculated peak flows will be used to size the onsite pipes and inlets. Calculations will be provided during final engineering.
CONCLUSION
In conclusion, the following was covered in this report:
The pre-development discharge patterns and points were discussed. The post-development discharge patterns and points were discussed. The pre-development flow rates up to the 100-year event were determined. The post-development un-mitigated flow rates up the 100-year event were determined. The post-development stormwater mitigation up to the 100-year event was analyzed.
As discussed in the report, the proposed developed discharges less stormwater than existing. Therefore, development is not expected to cause a negative impact to the downstream systems.
Drainage Area Drainage
Area
(AC)
Allowable
Q100 (cfs)
Mitigated
Q100 (cfs)
Volume
Provided
(cf)
A 15.93 58.50 5.04 7,903
Item: 11
1337
9 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix A - Rainfall Data
Item: 11
1338
NOAA Atlas 14, Volume 6, Version 2
Location name: Foothill Ranch, California, USA*
Latitude: 33.6766°, Longitude: -117.669°
Elevation: 779 ft**
* source: ESRI Maps
** source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
Sanja Perica, Sarah Dietz, Sarah Heim, Lillian Hiner, Kazungu Maitaria, Deborah Martin, Sandra Pavlovic, Ishani Roy, Carl Trypaluk, Dale Unruh, Fenglin Yan, Michael Yekta, Tan Zhao, Geoffrey Bonnin, Daniel Brewer, Li-Chuan Chen, Tye Parzybok, John Yarchoan NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches) 1 Duration
Average recurrence interval (years)
1 2 5 10 25 50 100 200 500 1000
5-min 0.137
(0.115‑0.164)
0.177
(0.148‑0.213)
0.231
(0.193‑0.280)
0.277
(0.229‑0.337)
0.340
(0.272‑0.429)
0.390
(0.304‑0.504)
0.442
(0.336‑0.586)
0.496
(0.367‑0.679)
0.573
(0.405‑0.819)
0.635
(0.433‑0.941)
10-min 0.196
(0.164‑0.236)
0.254
(0.213‑0.306)
0.332
(0.277‑0.401)
0.396
(0.328‑0.483)
0.487
(0.389‑0.615)
0.558
(0.436‑0.722)
0.633
(0.482‑0.840)
0.712
(0.526‑0.973)
0.822
(0.581‑1.17)
0.910
(0.620‑1.35)
15-min 0.237
(0.199‑0.285)
0.307
(0.257‑0.370)
0.401
(0.335‑0.485)
0.479
(0.397‑0.585)
0.589
(0.471‑0.744)
0.675
(0.528‑0.873)
0.765
(0.583‑1.02)
0.861
(0.636‑1.18)
0.994
(0.703‑1.42)
1.10 (0.750‑1.63)
30-min 0.335
(0.281‑0.403)
0.434
(0.364‑0.524)
0.568
(0.474‑0.686)
0.679
(0.562‑0.828)
0.833
(0.666‑1.05)
0.956
(0.747‑1.24)
1.08 (0.825‑1.44)
1.22 (0.900‑1.66)
1.41 (0.995‑2.01)
1.56 (1.06‑2.31)
60-min 0.468
(0.393‑0.564)
0.607
(0.509‑0.732)
0.793
(0.663‑0.959)
0.949
(0.786‑1.16)
1.16 (0.931‑1.47)
1.34 (1.04‑1.73)
1.52 (1.15‑2.01)
1.70 (1.26‑2.33)
1.97 (1.39‑2.81)
2.18 (1.48‑3.23)
2-hr 0.685
(0.575‑0.824)
0.881
(0.739‑1.06)
1.15 (0.962‑1.39)
1.38 (1.14‑1.68)
1.71 (1.37‑2.16)
1.98 (1.54‑2.55)
2.26 (1.72‑3.00)
2.56 (1.90‑3.51)
3.00 (2.12‑4.29)
3.37 (2.29‑4.99)
3-hr 0.858
(0.720‑1.03)
1.10 (0.923‑1.33)
1.44 (1.20‑1.74)
1.73 (1.43‑2.11)
2.14 (1.71‑2.71)
2.49 (1.94‑3.21)
2.85 (2.17‑3.78)
3.25 (2.40‑4.44)
3.83 (2.70‑5.47)
4.31 (2.94‑6.38)
6-hr 1.23
(1.03‑1.48)
1.58 (1.32‑1.90)
2.07 (1.73‑2.50)
2.48 (2.06‑3.03)
3.08 (2.46‑3.90)
3.57 (2.79‑4.62)
4.10 (3.12‑5.44)
4.67 (3.45‑6.38)
5.49 (3.88‑7.85)
6.18 (4.21‑9.16)
12-hr 1.62
(1.36‑1.96)
2.11 (1.77‑2.54)
2.77 (2.31‑3.34)
3.32 (2.75‑4.05)
4.11 (3.28‑5.19)
4.74 (3.70‑6.12)
5.40 (4.11‑7.16)
6.10 (4.51‑8.34)
7.10 (5.02‑10.1)
7.90 (5.39‑11.7)
24-hr 2.15
(1.90‑2.48)
2.83 (2.50‑3.27)
3.74 (3.29‑4.33)
4.50 (3.93‑5.25)
5.56 (4.70‑6.70)
6.39 (5.30‑7.87)
7.26 (5.88‑9.15)
8.18 (6.44‑10.6)
9.45 (7.16‑12.7)
10.5 (7.67‑14.6)
2-day 2.61
(2.30‑3.01)
3.48 (3.07‑4.02)
4.65 (4.10‑5.39)
5.64 (4.92‑6.58)
7.01 (5.93‑8.46)
8.11 (6.72‑9.98)
9.25 (7.49‑11.7)
10.5 (8.24‑13.5)
12.2 (9.20‑16.4)
13.5 (9.90‑18.8)
3-day 2.80
(2.48‑3.24)
3.77 (3.33‑4.36)
5.09 (4.48‑5.89)
6.19 (5.41‑7.23)
7.75 (6.56‑9.35)
9.00 (7.46‑11.1)
10.3 (8.35‑13.0)
11.7 (9.22‑15.2)
13.7 (10.3‑18.4)
15.2 (11.2‑21.2)
4-day 3.02
(2.67‑3.49)
4.09 (3.61‑4.73)
5.54 (4.88‑6.42)
6.77 (5.92‑7.91)
8.51 (7.20‑10.3)
9.90 (8.21‑12.2)
11.4 (9.20‑14.3)
12.9 (10.2‑16.7)
15.1 (11.5‑20.4)
16.9 (12.4‑23.6)
7-day 3.47
(3.06‑4.00)
4.72 (4.16‑5.45)
6.43 (5.66‑7.45)
7.88 (6.88‑9.20)
9.94 (8.41‑12.0)
11.6 (9.61‑14.3)
13.3 (10.8‑16.8)
15.2 (12.0‑19.7)
17.9 (13.5‑24.1)
20.1 (14.7‑27.9)
10-day 3.76
(3.32‑4.34)
5.14 (4.54‑5.94)
7.03 (6.19‑8.14)
8.63 (7.54‑10.1)
10.9 (9.23‑13.2)
12.8 (10.6‑15.7)
14.7 (11.9‑18.5)
16.8 (13.2‑21.8)
19.8 (15.0‑26.7)
22.2 (16.3‑31.0)
20-day 4.49
(3.97‑5.18)
6.20 (5.47‑7.16)
8.54 (7.52‑9.90)
10.6 (9.22‑12.3)
13.4 (11.4‑16.2)
15.8 (13.1‑19.4)
18.2 (14.8‑23.0)
20.9 (16.5‑27.1)
24.8 (18.8‑33.4)
28.0 (20.5‑38.9)
30-day 5.33
(4.71‑6.16)
7.37 (6.50‑8.52)
10.2 (8.97‑11.8)
12.6 (11.0‑14.7)
16.1 (13.6‑19.4)
18.9 (15.7‑23.3)
22.0 (17.8‑27.7)
25.3 (19.9‑32.7)
30.0 (22.7‑40.5)
34.0 (24.9‑47.3)
45-day 6.32
(5.58‑7.30)
8.68 (7.66‑10.0)
12.0 (10.5‑13.9)
14.8 (12.9‑17.3)
18.9 (16.0‑22.8)
22.3 (18.5‑27.4)
25.9 (21.0‑32.7)
29.9 (23.6‑38.7)
35.6 (27.0‑48.0)
40.4 (29.6‑56.3)
60-day 7.33
(6.48‑8.46)
9.96 (8.79‑11.5)
13.6 (12.0‑15.8)
16.8 (14.7‑19.7)
21.5 (18.2‑26.0)
25.4 (21.0‑31.2)
29.5 (23.9‑37.2)
34.1 (26.9‑44.2)
40.8 (30.9‑55.0)
46.4 (34.0‑64.6)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information.
Back to Top
PF graphical
Item: 11
1339
Back to Top
Maps & aerials
Small scale terrain
Item: 11
1340
Large scale terrain
Large scale map
Large scale aerial
+
–
3km
2mi
+
–
100km
60mi
+
–
100km
60mi
Item: 11
1341
Back to Top
US Department of Commerce
National Oceanic and Atmospheric Administration
National Weather Service
National Water Center
1325 East West Highway
Silver Spring, MD 20910
Questions?: [email protected]
Disclaimer
+
–
100km
60mi
Item: 11
1342
NOAA Atlas 14, Volume 6, Version 2
Location name: Foothill Ranch, California, USA*
Latitude: 33.6766°, Longitude: -117.669°
Elevation: 779 ft**
* source: ESRI Maps
** source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
Sanja Perica, Sarah Dietz, Sarah Heim, Lillian Hiner, Kazungu Maitaria, Deborah Martin, Sandra Pavlovic, Ishani Roy, Carl Trypaluk, Dale Unruh, Fenglin Yan, Michael Yekta, Tan Zhao, Geoffrey Bonnin, Daniel Brewer, Li-Chuan Chen, Tye Parzybok, John Yarchoan NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour) 1 Duration
Average recurrence interval (years)
1 2 5 10 25 50 100 200 500 1000
5-min 1.64
(1.38‑1.97)
2.12 (1.78‑2.56)
2.77 (2.32‑3.36)
3.32 (2.75‑4.04)
4.08 (3.26‑5.15)
4.68 (3.65‑6.05)
5.30 (4.03‑7.03)
5.95 (4.40‑8.15)
6.88 (4.86‑9.83)
7.62 (5.20‑11.3)
10-min 1.18
(0.984‑1.42)
1.52 (1.28‑1.84)
1.99 (1.66‑2.41)
2.38 (1.97‑2.90)
2.92 (2.33‑3.69)
3.35 (2.62‑4.33)
3.80 (2.89‑5.04)
4.27 (3.16‑5.84)
4.93 (3.49‑7.04)
5.46 (3.72‑8.09)
15-min 0.948
(0.796‑1.14)
1.23 (1.03‑1.48)
1.60 (1.34‑1.94)
1.92 (1.59‑2.34)
2.36 (1.88‑2.98)
2.70 (2.11‑3.49)
3.06 (2.33‑4.06)
3.44 (2.54‑4.70)
3.98 (2.81‑5.68)
4.40 (3.00‑6.52)
30-min 0.670
(0.562‑0.806)
0.868
(0.728‑1.05)
1.14 (0.948‑1.37)
1.36 (1.12‑1.66)
1.67 (1.33‑2.11)
1.91 (1.49‑2.47)
2.17 (1.65‑2.87)
2.44 (1.80‑3.33)
2.81 (1.99‑4.02)
3.12 (2.12‑4.62)
60-min 0.468
(0.393‑0.564)
0.607
(0.509‑0.732)
0.793
(0.663‑0.959)
0.949
(0.786‑1.16)
1.16 (0.931‑1.47)
1.34 (1.04‑1.73)
1.52 (1.15‑2.01)
1.70 (1.26‑2.33)
1.97 (1.39‑2.81)
2.18 (1.48‑3.23)
2-hr 0.342
(0.287‑0.412)
0.440
(0.369‑0.531)
0.575
(0.481‑0.696)
0.690
(0.572‑0.842)
0.855
(0.683‑1.08)
0.988
(0.772‑1.28)
1.13 (0.860‑1.50)
1.28 (0.948‑1.75)
1.50 (1.06‑2.15)
1.68 (1.15‑2.49)
3-hr 0.285
(0.239‑0.343)
0.366
(0.307‑0.442)
0.479
(0.400‑0.579)
0.575
(0.476‑0.701)
0.714
(0.570‑0.902)
0.827
(0.647‑1.07)
0.949
(0.722‑1.26)
1.08 (0.799‑1.48)
1.27 (0.900‑1.82)
1.43 (0.977‑2.12)
6-hr 0.205
(0.172‑0.247)
0.264
(0.221‑0.318)
0.345
(0.288‑0.417)
0.414
(0.343‑0.505)
0.514
(0.411‑0.650)
0.596
(0.466‑0.771)
0.684
(0.521‑0.907)
0.779
(0.576‑1.06)
0.917
(0.648‑1.31)
1.03 (0.703‑1.53)
12-hr 0.134
(0.113‑0.162)
0.175
(0.146‑0.210)
0.229
(0.191‑0.277)
0.275
(0.228‑0.336)
0.341
(0.272‑0.431)
0.393
(0.307‑0.508)
0.448
(0.341‑0.594)
0.506
(0.374‑0.692)
0.589
(0.416‑0.841)
0.656
(0.447‑0.972)
24-hr 0.089
(0.079‑0.103)
0.117
(0.103‑0.136)
0.155
(0.137‑0.180)
0.187
(0.163‑0.218)
0.231
(0.195‑0.279)
0.266
(0.220‑0.327)
0.302
(0.245‑0.381)
0.340
(0.268‑0.441)
0.393
(0.298‑0.530)
0.436
(0.319‑0.607)
2-day 0.054
(0.047‑0.062)
0.072
(0.063‑0.083)
0.096
(0.085‑0.112)
0.117
(0.102‑0.137)
0.146
(0.123‑0.176)
0.168
(0.140‑0.207)
0.192
(0.156‑0.242)
0.217
(0.171‑0.282)
0.253
(0.191‑0.341)
0.281
(0.206‑0.392)
3-day 0.038
(0.034‑0.044)
0.052
(0.046‑0.060)
0.070
(0.062‑0.081)
0.086
(0.075‑0.100)
0.107
(0.091‑0.129)
0.125
(0.103‑0.153)
0.143
(0.115‑0.180)
0.162
(0.128‑0.210)
0.189
(0.143‑0.255)
0.211
(0.155‑0.295)
4-day 0.031
(0.027‑0.036)
0.042
(0.037‑0.049)
0.057
(0.050‑0.066)
0.070
(0.061‑0.082)
0.088
(0.074‑0.106)
0.103
(0.085‑0.126)
0.118
(0.095‑0.149)
0.134
(0.106‑0.174)
0.157
(0.119‑0.212)
0.176
(0.129‑0.245)
7-day 0.020
(0.018‑0.023)
0.028
(0.024‑0.032)
0.038
(0.033‑0.044)
0.046
(0.040‑0.054)
0.059
(0.050‑0.071)
0.069
(0.057‑0.084)
0.079
(0.064‑0.100)
0.090
(0.071‑0.117)
0.106
(0.080‑0.143)
0.119
(0.087‑0.166)
10-day 0.015
(0.013‑0.018)
0.021
(0.018‑0.024)
0.029
(0.025‑0.033)
0.035
(0.031‑0.042)
0.045
(0.038‑0.054)
0.053
(0.044‑0.065)
0.061
(0.049‑0.077)
0.070
(0.055‑0.090)
0.082
(0.062‑0.111)
0.092
(0.067‑0.129)
20-day 0.009
(0.008‑0.010)
0.012
(0.011‑0.014)
0.017
(0.015‑0.020)
0.021
(0.019‑0.025)
0.027
(0.023‑0.033)
0.032
(0.027‑0.040)
0.038
(0.030‑0.047)
0.043
(0.034‑0.056)
0.051
(0.039‑0.069)
0.058
(0.042‑0.081)
30-day 0.007
(0.006‑0.008)
0.010
(0.009‑0.011)
0.014
(0.012‑0.016)
0.017
(0.015‑0.020)
0.022
(0.018‑0.026)
0.026
(0.021‑0.032)
0.030
(0.024‑0.038)
0.035
(0.027‑0.045)
0.041
(0.031‑0.056)
0.047
(0.034‑0.065)
45-day 0.005
(0.005‑0.006)
0.008
(0.007‑0.009)
0.011
(0.009‑0.012)
0.013
(0.011‑0.016)
0.017
(0.014‑0.021)
0.020
(0.017‑0.025)
0.023
(0.019‑0.030)
0.027
(0.021‑0.035)
0.033
(0.024‑0.044)
0.037
(0.027‑0.052)
60-day 0.005
(0.004‑0.005)
0.006
(0.006‑0.007)
0.009
(0.008‑0.010)
0.011
(0.010‑0.013)
0.014
(0.012‑0.018)
0.017
(0.014‑0.021)
0.020
(0.016‑0.025)
0.023
(0.018‑0.030)
0.028
(0.021‑0.038)
0.032
(0.023‑0.044)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information.
Back to Top
PF graphical
Item: 11
1343
Back to Top
Maps & aerials
Small scale terrain
Item: 11
1344
Large scale terrain
Large scale map
Large scale aerial
+
–
3km
2mi
+
–
100km
60mi
+
–
100km
60mi
Item: 11
1345
Back to Top
US Department of Commerce
National Oceanic and Atmospheric Administration
National Weather Service
National Water Center
1325 East West Highway
Silver Spring, MD 20910
Questions?: [email protected]
Disclaimer
+
–
100km
60mi
Item: 11
1346
10 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix B - FIRM MAP
Item: 11
1347
National Flood Hazard Layer FIRMette
0 250 500 1,000 1,500 2,000
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mile Zone X
Future Conditions 1% Annual
Chance Flood Hazard Zone X
Area with Reduced Flood Risk due to
Levee. See Notes. Zone X
Area with Flood Risk due to Levee Zone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 5/16/2025 at 6:04 PM and does not
reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8 B
20.2 The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
117°40'27"W 33°40'51"N
117°39'49"W 33°40'21"N
Basemap Imagery Source: USGS National Map 2023
Item: 11
1348
11 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix C – Soils Information
Item: 11
1349
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Orange County and Part of Riverside County, California
Survey Area Data: Version 18, Aug 30, 2024
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Jan 17, 2023—Feb 8, 2023
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Soil Map—Orange County and Part of Riverside County, California Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/16/2025
Item: 11
1350
Soil Map—Orange County and Part of Riverside County, California Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/16/2025
3726380 3726450 3726520 3726590 3726660 3726730 3726800 3726380 3726450 3726520 3726590 3726660 3726730 3726800 437730 437800 437870 437940 438010 438080 438150 438220 438290 438360 437730 437800 437870 437940 438010 438080 438150 438220 438290 438360 33° 40' 45'' N
117° 40' 19'' W
33° 40' 45'' N
117° 39' 52'' W
33° 40' 31'' N
117° 40' 19'' W
33° 40' 31'' N
117° 39' 52'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 150 300 600 900
Feet
0 45 90 180 270
Meters
Map Scale: 1:3,160 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
Item: 11
1351
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 136 Capistrano sandy loam, 9 to 15
percent slopes
0.2 1.0%
142 Cieneba sandy loam, 30 to 75
percent slopes, eroded
4.4 24.7%
177 Myford sandy loam, 9 to 30
percent slopes, eroded
13.2 74.2%
Totals for Area of Interest 17.8 100.0%
Soil Map—Orange County and Part of Riverside County, California Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/16/2025
Item: 11
1352
12 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix D - Existing and Proposed
Drainage Maps
Item: 11
1353
B.2 4.32 C.1 1.56 D.1 0.64 A 1.51D.2 1.23 D.3 2.14 B.1 2.15 C.2 2.38 Know what's before you dig. below. Call 811 R LEGEND DRAINAGE SUMMARY X XXX TOWNE CENTRE DRMARKET (PRIVATE ROAD) HYDROLOGY INFORMATION COSTCO - FOOTHILL RANCH PRE-DEVELOPMENT HYDROLOGY EXHIBIT TOWNE CENTRE AND MARKET © 1 NORTH FOOTHILL TRANSPORTATION CORRIDOR 1354
v v v ENTRY EXIT
RESTRICTED ELECTRIC VEHICLES ONLY RESTRICTED ELECTRIC VEHICLES ONLY v A3 2.37 A7.2 2.26A6 1.30 A5 0.34 A1 2.83 A2 1.65A4.1 1.38 A4 3.10 A7.1 0.70 LEGEND HYDROLOGY INFORMATION X XXX COSTCO - FOOTHILL RANCH POST-DEVELOPMENT HYDROLOGY EXHIBIT TOWNE CENTRE AND MARKET © 2 DRAINAGE NOTES NORTH Know what's before you dig. below. Call 811 R HYDROLOGY SUMMARY Δ
TOWNE CENTRE DR
MARKET (PRIVATE ROAD)
FOOTHILL TRANSPORTATION CORRIDOR
1355
13 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix E - Rational Method Analysis
Item: 11
1356
____________________________________________________________________________ ****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
(Reference: 1986 ORANGE COUNTY HYDROLOGY CRITERION)
(c) Copyright 1983-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
************************** DESCRIPTION OF STUDY ************************** * COSTCO FOOTHILL RANCH *
* EXISTING 2 YEAR RATIONAL METHOD *
* KIMLEY-HORN *
************************************************************************** FILE NAME: FRRME2YR.DAT
TIME/DATE OF STUDY: 11:11 09/17/2025
============================================================================ USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
============================================================================ --*TIME-OF-CONCENTRATION MODEL*--
USER SPECIFIED STORM EVENT(YEAR) = 2.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 6.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *DATA BANK RAINFALL USED*
*ANTECEDENT MOISTURE CONDITION (AMC) I ASSUMED FOR RATIONAL METHOD* *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:
1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
*USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED **************************************************************************** FLOW PROCESS FROM NODE 1.10 TO NODE 1.20 IS CODE = 21
Item: 11
1357
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 314.00
ELEVATION DATA: UPSTREAM(FEET) = 783.30 DOWNSTREAM(FEET) = 775.81 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.399
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.965
SUBAREA Tc AND LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 1.45 0.25 0.100 50 6.40
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 2.53
TOTAL AREA(ACRES) = 1.45 PEAK FLOW RATE(CFS) = 2.53
**************************************************************************** FLOW PROCESS FROM NODE 2.10 TO NODE 2.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 301.00
ELEVATION DATA: UPSTREAM(FEET) = 787.52 DOWNSTREAM(FEET) = 782.97 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.893
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.883
SUBAREA Tc AND LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 2.04 0.25 0.100 50 6.89
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 3.41
TOTAL AREA(ACRES) = 2.04 PEAK FLOW RATE(CFS) = 3.41
**************************************************************************** FLOW PROCESS FROM NODE 2.20 TO NODE 2.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 782.97 DOWNSTREAM(FEET) = 776.77 CHANNEL LENGTH THRU SUBAREA(FEET) = 301.00 CHANNEL SLOPE = 0.0206 CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
Item: 11
1358
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.634
SUBAREA LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 4.14 0.25 0.100 50
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 6.41
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 2.60 AVERAGE FLOW DEPTH(FEET) = 0.13 TRAVEL TIME(MIN.) = 1.93 Tc(MIN.) = 8.82
SUBAREA AREA(ACRES) = 4.14 SUBAREA RUNOFF(CFS) = 6.00
EFFECTIVE AREA(ACRES) = 6.18 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 6.2 PEAK FLOW RATE(CFS) = 8.95
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.16 FLOW VELOCITY(FEET/SEC.) = 2.82
LONGEST FLOWPATH FROM NODE 2.10 TO NODE 2.30 = 602.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 3.10 TO NODE 3.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 189.00
ELEVATION DATA: UPSTREAM(FEET) = 782.48 DOWNSTREAM(FEET) = 778.16 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.268
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.197
SUBAREA Tc AND LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 1.58 0.25 0.100 50 5.27
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 3.09
TOTAL AREA(ACRES) = 1.58 PEAK FLOW RATE(CFS) = 3.09
**************************************************************************** FLOW PROCESS FROM NODE 3.20 TO NODE 3.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 778.16 DOWNSTREAM(FEET) = 774.54 CHANNEL LENGTH THRU SUBAREA(FEET) = 189.00 CHANNEL SLOPE = 0.0192 CHANNEL BASE(FEET) = 85.00 "Z" FACTOR = 99.000
Item: 11
1359
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.809
SUBAREA LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 1.90 0.25 0.100 50
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 4.63
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 1.48 AVERAGE FLOW DEPTH(FEET) = 0.04 TRAVEL TIME(MIN.) = 2.12 Tc(MIN.) = 7.39
SUBAREA AREA(ACRES) = 1.90 SUBAREA RUNOFF(CFS) = 3.05
EFFECTIVE AREA(ACRES) = 3.48 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 3.5 PEAK FLOW RATE(CFS) = 5.59
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.04 FLOW VELOCITY(FEET/SEC.) = 1.53
LONGEST FLOWPATH FROM NODE 3.10 TO NODE 3.30 = 378.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.10 TO NODE 4.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 329.00
ELEVATION DATA: UPSTREAM(FEET) = 777.53 DOWNSTREAM(FEET) = 776.74 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 10.320
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.493
SUBAREA Tc AND LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 0.64 0.25 0.100 50 10.32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 0.85
TOTAL AREA(ACRES) = 0.64 PEAK FLOW RATE(CFS) = 0.85
**************************************************************************** FLOW PROCESS FROM NODE 4.20 TO NODE 4.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 776.74 DOWNSTREAM(FEET) = 776.52 CHANNEL LENGTH THRU SUBAREA(FEET) = 168.00 CHANNEL SLOPE = 0.0013 Item: 11
1360
CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.216
SUBAREA LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 1.23 0.25 0.100 50
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 1.51
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 0.63 AVERAGE FLOW DEPTH(FEET) = 0.13 TRAVEL TIME(MIN.) = 4.45 Tc(MIN.) = 14.77
SUBAREA AREA(ACRES) = 1.23 SUBAREA RUNOFF(CFS) = 1.32
EFFECTIVE AREA(ACRES) = 1.87 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 1.9 PEAK FLOW RATE(CFS) = 2.00
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.15 FLOW VELOCITY(FEET/SEC.) = 0.69
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.30 = 497.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.30 TO NODE 4.40 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 776.52 DOWNSTREAM(FEET) = 774.63 CHANNEL LENGTH THRU SUBAREA(FEET) = 272.00 CHANNEL SLOPE = 0.0069 CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.085
SUBAREA LOSS RATE DATA(AMC I ):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 2.15 0.25 0.100 50
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 3.03
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 1.40 AVERAGE FLOW DEPTH(FEET) = 0.12 TRAVEL TIME(MIN.) = 3.24 Tc(MIN.) = 18.01
SUBAREA AREA(ACRES) = 2.15 SUBAREA RUNOFF(CFS) = 2.05
EFFECTIVE AREA(ACRES) = 4.02 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 4.0 PEAK FLOW RATE(CFS) = 3.83
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.13 FLOW VELOCITY(FEET/SEC.) = 1.56
Item: 11
1361
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.40 = 769.00 FEET. ============================================================================ END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 4.0 TC(MIN.) = 18.01
EFFECTIVE AREA(ACRES) = 4.02 AREA-AVERAGED Fm(INCH/HR)= 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.100 PEAK FLOW RATE(CFS) = 3.83
============================================================================ ============================================================================
END OF RATIONAL METHOD ANALYSIS
Item: 11
1362
____________________________________________________________________________ ****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
(Reference: 1986 ORANGE COUNTY HYDROLOGY CRITERION)
(c) Copyright 1983-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
************************** DESCRIPTION OF STUDY ************************** * COSTCO FOOTHILL RANCH *
* EXISTING 100 YEAR RATIONAL METHOD *
* KIMLEY-HORN *
************************************************************************** FILE NAME: FRRME2YR.DAT
TIME/DATE OF STUDY: 11:21 09/17/2025
============================================================================ USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
============================================================================ --*TIME-OF-CONCENTRATION MODEL*--
USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 6.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *DATA BANK RAINFALL USED*
*ANTECEDENT MOISTURE CONDITION (AMC) III ASSUMED FOR RATIONAL METHOD* *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0312 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:
1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
*USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED **************************************************************************** FLOW PROCESS FROM NODE 1.10 TO NODE 1.20 IS CODE = 21
Item: 11
1363
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 314.00
ELEVATION DATA: UPSTREAM(FEET) = 783.30 DOWNSTREAM(FEET) = 775.81 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.399
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.371
SUBAREA Tc AND LOSS RATE DATA(AMC III):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 1.45 0.25 0.100 86 6.40
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 6.98
TOTAL AREA(ACRES) = 1.45 PEAK FLOW RATE(CFS) = 6.98
**************************************************************************** FLOW PROCESS FROM NODE 2.10 TO NODE 2.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 301.00
ELEVATION DATA: UPSTREAM(FEET) = 787.52 DOWNSTREAM(FEET) = 782.97 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.893
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.148
SUBAREA Tc AND LOSS RATE DATA(AMC III):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 2.04 0.25 0.100 86 6.89
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 9.40
TOTAL AREA(ACRES) = 2.04 PEAK FLOW RATE(CFS) = 9.40
**************************************************************************** FLOW PROCESS FROM NODE 2.20 TO NODE 2.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 782.97 DOWNSTREAM(FEET) = 776.77 CHANNEL LENGTH THRU SUBAREA(FEET) = 301.00 CHANNEL SLOPE = 0.0206 CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
Item: 11
1364
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.599
SUBAREA LOSS RATE DATA(AMC III):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 4.14 0.25 0.100 86
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 17.96
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 3.35 AVERAGE FLOW DEPTH(FEET) = 0.21 TRAVEL TIME(MIN.) = 1.50 Tc(MIN.) = 8.39
SUBAREA AREA(ACRES) = 4.14 SUBAREA RUNOFF(CFS) = 17.04
EFFECTIVE AREA(ACRES) = 6.18 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 6.2 PEAK FLOW RATE(CFS) = 25.44
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.24 FLOW VELOCITY(FEET/SEC.) = 3.70
LONGEST FLOWPATH FROM NODE 2.10 TO NODE 2.30 = 602.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 3.10 TO NODE 3.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 189.00
ELEVATION DATA: UPSTREAM(FEET) = 782.48 DOWNSTREAM(FEET) = 778.16 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.268
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 6.005
SUBAREA Tc AND LOSS RATE DATA(AMC III):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 1.58 0.25 0.100 86 5.27
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 8.50
TOTAL AREA(ACRES) = 1.58 PEAK FLOW RATE(CFS) = 8.50
**************************************************************************** FLOW PROCESS FROM NODE 3.20 TO NODE 3.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 778.16 DOWNSTREAM(FEET) = 774.54 CHANNEL LENGTH THRU SUBAREA(FEET) = 189.00 CHANNEL SLOPE = 0.0192 CHANNEL BASE(FEET) = 85.00 "Z" FACTOR = 99.000
Item: 11
1365
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.218
SUBAREA LOSS RATE DATA(AMC III):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 1.90 0.25 0.100 86
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 12.97
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 2.15 AVERAGE FLOW DEPTH(FEET) = 0.07 TRAVEL TIME(MIN.) = 1.46 Tc(MIN.) = 6.73
SUBAREA AREA(ACRES) = 1.90 SUBAREA RUNOFF(CFS) = 8.88
EFFECTIVE AREA(ACRES) = 3.48 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 3.5 PEAK FLOW RATE(CFS) = 16.27
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.07 FLOW VELOCITY(FEET/SEC.) = 2.40
LONGEST FLOWPATH FROM NODE 3.10 TO NODE 3.30 = 378.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.10 TO NODE 4.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 329.00
ELEVATION DATA: UPSTREAM(FEET) = 777.53 DOWNSTREAM(FEET) = 776.74 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 10.320
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.085
SUBAREA Tc AND LOSS RATE DATA(AMC III):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 0.64 0.25 0.100 86 10.32
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 2.34
TOTAL AREA(ACRES) = 0.64 PEAK FLOW RATE(CFS) = 2.34
**************************************************************************** FLOW PROCESS FROM NODE 4.20 TO NODE 4.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 776.74 DOWNSTREAM(FEET) = 776.52 CHANNEL LENGTH THRU SUBAREA(FEET) = 168.00 CHANNEL SLOPE = 0.0013 Item: 11
1366
CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.476
SUBAREA LOSS RATE DATA(AMC III):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 1.23 0.25 0.100 86
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 4.26
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 0.83 AVERAGE FLOW DEPTH(FEET) = 0.20 TRAVEL TIME(MIN.) = 3.36 Tc(MIN.) = 13.68
SUBAREA AREA(ACRES) = 1.23 SUBAREA RUNOFF(CFS) = 3.82
EFFECTIVE AREA(ACRES) = 1.87 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 1.9 PEAK FLOW RATE(CFS) = 5.81
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.23 FLOW VELOCITY(FEET/SEC.) = 0.90
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.30 = 497.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.30 TO NODE 4.40 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 776.52 DOWNSTREAM(FEET) = 774.63 CHANNEL LENGTH THRU SUBAREA(FEET) = 272.00 CHANNEL SLOPE = 0.0069 CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.169
SUBAREA LOSS RATE DATA(AMC III):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 2.15 0.25 0.100 86
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 8.85
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 1.89 AVERAGE FLOW DEPTH(FEET) = 0.19 TRAVEL TIME(MIN.) = 2.40 Tc(MIN.) = 16.07
SUBAREA AREA(ACRES) = 2.15 SUBAREA RUNOFF(CFS) = 6.08
EFFECTIVE AREA(ACRES) = 4.02 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 4.0 PEAK FLOW RATE(CFS) = 11.38
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.22 FLOW VELOCITY(FEET/SEC.) = 1.99
Item: 11
1367
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.40 = 769.00 FEET. ============================================================================ END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 4.0 TC(MIN.) = 16.07
EFFECTIVE AREA(ACRES) = 4.02 AREA-AVERAGED Fm(INCH/HR)= 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.100 PEAK FLOW RATE(CFS) = 11.38
============================================================================ ============================================================================
END OF RATIONAL METHOD ANALYSIS
Item: 11
1368
____________________________________________________________________________ ****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
(Reference: 1986 ORANGE COUNTY HYDROLOGY CRITERION)
(c) Copyright 1983-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
************************** DESCRIPTION OF STUDY ************************** * COSTCO FOOTHILL RANCH *
* PROPOSED 2 YEAR RATIONAL METHOD *
* KIMLEY-HORN *
************************************************************************** FILE NAME: FRRM2YP.DAT
TIME/DATE OF STUDY: 10:48 09/18/2025
============================================================================ USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
============================================================================ --*TIME-OF-CONCENTRATION MODEL*--
USER SPECIFIED STORM EVENT(YEAR) = 2.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 6.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *DATA BANK RAINFALL USED*
*ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD* *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0312 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:
1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
*USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED **************************************************************************** FLOW PROCESS FROM NODE 1.10 TO NODE 1.20 IS CODE = 21
Item: 11
1369
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 330.00
ELEVATION DATA: UPSTREAM(FEET) = 785.09 DOWNSTREAM(FEET) = 780.16 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 7.168
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.841
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 2.72 0.25 0.100 69 7.17
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 4.45
TOTAL AREA(ACRES) = 2.72 PEAK FLOW RATE(CFS) = 4.45
**************************************************************************** FLOW PROCESS FROM NODE 1.20 TO NODE 2.20 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 775.54 DOWNSTREAM(FEET) = 774.90 FLOW LENGTH(FEET) = 128.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 15.0 INCH PIPE IS 12.3 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 4.14
ESTIMATED PIPE DIAMETER(INCH) = 15.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 4.45
PIPE TRAVEL TIME(MIN.) = 0.52 Tc(MIN.) = 7.68
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 2.20 = 458.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 2.20 TO NODE 2.20 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 7.68
RAINFALL INTENSITY(INCH/HR) = 1.77
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 2.72
TOTAL STREAM AREA(ACRES) = 2.72
PEAK FLOW RATE(CFS) AT CONFLUENCE = 4.45
Item: 11
1370
**************************************************************************** FLOW PROCESS FROM NODE 2.10 TO NODE 2.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 220.00
ELEVATION DATA: UPSTREAM(FEET) = 784.75 DOWNSTREAM(FEET) = 780.45 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.776
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.084
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 1.49 0.25 0.100 69 5.78
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 2.76
TOTAL AREA(ACRES) = 1.49 PEAK FLOW RATE(CFS) = 2.76
**************************************************************************** FLOW PROCESS FROM NODE 2.20 TO NODE 2.20 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 5.78
RAINFALL INTENSITY(INCH/HR) = 2.08
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 1.49
TOTAL STREAM AREA(ACRES) = 1.49
PEAK FLOW RATE(CFS) AT CONFLUENCE = 2.76
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 4.45 7.68 1.769 0.25( 0.03) 0.10 2.7 1.10
2 2.76 5.78 2.084 0.25( 0.03) 0.10 1.5 2.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
Item: 11
1371
1 6.71 5.78 2.084 0.25( 0.02) 0.10 3.5 2.10
2 6.78 7.68 1.769 0.25( 0.03) 0.10 4.2 1.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 6.78 Tc(MIN.) = 7.68
EFFECTIVE AREA(ACRES) = 4.21 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 4.2
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 2.20 = 458.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 2.30 TO NODE 3.30 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 774.80 DOWNSTREAM(FEET) = 773.75 FLOW LENGTH(FEET) = 136.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.7 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 5.59
ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 6.78
PIPE TRAVEL TIME(MIN.) = 0.41 Tc(MIN.) = 8.09
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 3.30 = 594.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 3.30 TO NODE 3.30 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 8.09
RAINFALL INTENSITY(INCH/HR) = 1.72
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 4.21
TOTAL STREAM AREA(ACRES) = 4.21
PEAK FLOW RATE(CFS) AT CONFLUENCE = 6.78
**************************************************************************** FLOW PROCESS FROM NODE 3.10 TO NODE 3.20 IS CODE = 22
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>>>>USE SPECIFIED Tc VALUE FOR INITIAL SUBAREA<<<
============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 136.00
USER SPECIFIED Tc(MIN.) = 5.000
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.264
Item: 11
1372
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 2.31 0.25 0.100 69
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 4.65
TOTAL AREA(ACRES) = 2.31 PEAK FLOW RATE(CFS) = 4.65
**************************************************************************** FLOW PROCESS FROM NODE 3.20 TO NODE 3.30 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 778.22 DOWNSTREAM(FEET) = 773.75 FLOW LENGTH(FEET) = 265.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 15.0 INCH PIPE IS 8.1 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.88
ESTIMATED PIPE DIAMETER(INCH) = 15.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 4.65
PIPE TRAVEL TIME(MIN.) = 0.64 Tc(MIN.) = 5.64
LONGEST FLOWPATH FROM NODE 3.10 TO NODE 3.30 = 401.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 3.30 TO NODE 3.30 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 5.64
RAINFALL INTENSITY(INCH/HR) = 2.11
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 2.31
TOTAL STREAM AREA(ACRES) = 2.31
PEAK FLOW RATE(CFS) AT CONFLUENCE = 4.65
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 6.71 6.18 2.004 0.25( 0.02) 0.10 3.5 2.10
1 6.78 8.09 1.717 0.25( 0.03) 0.10 4.2 1.10
2 4.65 5.64 2.112 0.25( 0.03) 0.10 2.3 3.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
Item: 11
1373
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 11.11 5.64 2.112 0.25( 0.02) 0.10 5.5 3.10
2 11.12 6.18 2.004 0.25( 0.03) 0.10 5.8 2.10
3 10.56 8.09 1.717 0.25( 0.03) 0.10 6.5 1.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 11.12 Tc(MIN.) = 6.18
EFFECTIVE AREA(ACRES) = 5.84 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 6.5
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 3.30 = 594.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 3.30 TO NODE 4.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 773.65 DOWNSTREAM(FEET) = 769.47 FLOW LENGTH(FEET) = 97.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 15.0 INCH PIPE IS 10.6 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 11.96
ESTIMATED PIPE DIAMETER(INCH) = 15.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 11.12
PIPE TRAVEL TIME(MIN.) = 0.14 Tc(MIN.) = 6.32
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 4.40 = 691.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.40 TO NODE 4.40 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 6.32
RAINFALL INTENSITY(INCH/HR) = 1.98
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 5.84
TOTAL STREAM AREA(ACRES) = 6.52
PEAK FLOW RATE(CFS) AT CONFLUENCE = 11.12
**************************************************************************** FLOW PROCESS FROM NODE 4.10 TO NODE 4.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
Item: 11
1374
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 214.00
ELEVATION DATA: UPSTREAM(FEET) = 784.71 DOWNSTREAM(FEET) = 780.40 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.678
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.104
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 1.36 0.25 0.100 69 5.68
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 2.55
TOTAL AREA(ACRES) = 1.36 PEAK FLOW RATE(CFS) = 2.55
**************************************************************************** FLOW PROCESS FROM NODE 4.20 TO NODE 4.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 780.40 DOWNSTREAM(FEET) = 775.74 CHANNEL LENGTH THRU SUBAREA(FEET) = 237.00 CHANNEL SLOPE = 0.0197 CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.811
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 3.09 0.25 0.100 69
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 5.04
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 2.32 AVERAGE FLOW DEPTH(FEET) = 0.12 TRAVEL TIME(MIN.) = 1.70 Tc(MIN.) = 7.38
SUBAREA AREA(ACRES) = 3.09 SUBAREA RUNOFF(CFS) = 4.97
EFFECTIVE AREA(ACRES) = 4.45 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 4.4 PEAK FLOW RATE(CFS) = 7.15
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.14 FLOW VELOCITY(FEET/SEC.) = 2.64
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.30 = 451.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.30 TO NODE 4.40 IS CODE = 31
---------------------------------------------------------------------------- Item: 11
1375
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 771.14 DOWNSTREAM(FEET) = 769.66 FLOW LENGTH(FEET) = 296.40 MANNING'S N = 0.013
DEPTH OF FLOW IN 18.0 INCH PIPE IS 14.6 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 4.67
ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 7.15
PIPE TRAVEL TIME(MIN.) = 1.06 Tc(MIN.) = 8.44
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.40 = 747.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.40 TO NODE 4.40 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 8.44
RAINFALL INTENSITY(INCH/HR) = 1.68
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 4.45
TOTAL STREAM AREA(ACRES) = 4.45
PEAK FLOW RATE(CFS) AT CONFLUENCE = 7.15
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 11.11 5.78 2.083 0.25( 0.02) 0.10 5.5 3.10
1 11.12 6.32 1.979 0.25( 0.03) 0.10 5.8 2.10
1 10.56 8.23 1.701 0.25( 0.03) 0.10 6.5 1.10
2 7.15 8.44 1.677 0.25( 0.03) 0.10 4.4 4.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 17.21 5.78 2.083 0.25( 0.02) 0.10 8.6 3.10
2 17.46 6.32 1.979 0.25( 0.03) 0.10 9.2 2.10
3 17.63 8.23 1.701 0.25( 0.03) 0.10 10.9 1.10
4 17.56 8.44 1.677 0.25( 0.03) 0.10 11.0 4.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 17.63 Tc(MIN.) = 8.23
Item: 11
1376
EFFECTIVE AREA(ACRES) = 10.86 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 11.0
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.40 = 747.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.40 TO NODE 6.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 769.66 DOWNSTREAM(FEET) = 767.76 FLOW LENGTH(FEET) = 342.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 27.0 INCH PIPE IS 18.0 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.26
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 17.63
PIPE TRAVEL TIME(MIN.) = 0.91 Tc(MIN.) = 9.14
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 6.40 = 1089.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 10
---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 13
---------------------------------------------------------------------------- >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<<
============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 5.10 TO NODE 5.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 229.00
ELEVATION DATA: UPSTREAM(FEET) = 784.59 DOWNSTREAM(FEET) = 784.09 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 9.099
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.605
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 0.41 0.25 0.100 69 9.10
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
Item: 11
1377
SUBAREA RUNOFF(CFS) = 0.58
TOTAL AREA(ACRES) = 0.41 PEAK FLOW RATE(CFS) = 0.58
**************************************************************************** FLOW PROCESS FROM NODE 5.20 TO NODE 6.30 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 779.49 DOWNSTREAM(FEET) = 778.11 FLOW LENGTH(FEET) = 142.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 9.0 INCH PIPE IS 3.8 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 3.33
ESTIMATED PIPE DIAMETER(INCH) = 9.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 0.58
PIPE TRAVEL TIME(MIN.) = 0.71 Tc(MIN.) = 9.81
LONGEST FLOWPATH FROM NODE 5.10 TO NODE 6.30 = 371.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.30 TO NODE 6.30 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 9.81
RAINFALL INTENSITY(INCH/HR) = 1.54
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 0.41
TOTAL STREAM AREA(ACRES) = 0.41
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.58
**************************************************************************** FLOW PROCESS FROM NODE 6.10 TO NODE 6.20 IS CODE = 22
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>>>>USE SPECIFIED Tc VALUE FOR INITIAL SUBAREA<<<
============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 142.00
USER SPECIFIED Tc(MIN.) = 5.000
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.264
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 1.26 0.25 0.100 69
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 2.54
Item: 11
1378
TOTAL AREA(ACRES) = 1.26 PEAK FLOW RATE(CFS) = 2.54
**************************************************************************** FLOW PROCESS FROM NODE 6.20 TO NODE 6.30 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 778.22 DOWNSTREAM(FEET) = 778.11 FLOW LENGTH(FEET) = 22.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 15.0 INCH PIPE IS 8.1 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 3.74
ESTIMATED PIPE DIAMETER(INCH) = 15.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 2.54
PIPE TRAVEL TIME(MIN.) = 0.10 Tc(MIN.) = 5.10
LONGEST FLOWPATH FROM NODE 6.10 TO NODE 6.30 = 164.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.30 TO NODE 6.30 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 5.10
RAINFALL INTENSITY(INCH/HR) = 2.24
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 1.26
TOTAL STREAM AREA(ACRES) = 1.26
PEAK FLOW RATE(CFS) AT CONFLUENCE = 2.54
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 0.58 9.81 1.538 0.25( 0.03) 0.10 0.4 5.10
2 2.54 5.10 2.239 0.25( 0.03) 0.10 1.3 6.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 2.98 5.10 2.239 0.25( 0.03) 0.10 1.5 6.10
2 2.32 9.81 1.538 0.25( 0.03) 0.10 1.7 5.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
Item: 11
1379
PEAK FLOW RATE(CFS) = 2.98 Tc(MIN.) = 5.10
EFFECTIVE AREA(ACRES) = 1.47 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 1.7
LONGEST FLOWPATH FROM NODE 5.10 TO NODE 6.30 = 371.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.30 TO NODE 6.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 778.11 DOWNSTREAM(FEET) = 767.76 FLOW LENGTH(FEET) = 534.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 12.0 INCH PIPE IS 6.8 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.48
ESTIMATED PIPE DIAMETER(INCH) = 12.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 2.98
PIPE TRAVEL TIME(MIN.) = 1.37 Tc(MIN.) = 6.47
LONGEST FLOWPATH FROM NODE 5.10 TO NODE 6.40 = 905.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 10
---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 3 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 11
---------------------------------------------------------------------------- >>>>>CONFLUENCE MEMORY BANK # 1 WITH THE MAIN-STREAM MEMORY<<<<< ============================================================================ ** MAIN STREAM CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 2.98 6.47 1.952 0.25( 0.03) 0.10 1.5 6.10
2 2.32 11.27 1.420 0.25( 0.03) 0.10 1.7 5.10
LONGEST FLOWPATH FROM NODE 5.10 TO NODE 6.40 = 905.00 FEET. ** MEMORY BANK # 1 CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 17.21 6.69 1.915 0.25( 0.02) 0.10 8.6 3.10
2 17.46 7.23 1.832 0.25( 0.03) 0.10 9.2 2.10
3 17.63 9.14 1.602 0.25( 0.03) 0.10 10.9 1.10
4 17.56 9.35 1.581 0.25( 0.03) 0.10 11.0 4.10
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 6.40 = 1089.40 FEET. ** PEAK FLOW RATE TABLE **
Item: 11
1380
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 19.96 6.47 1.952 0.25( 0.02) 0.10 9.8 6.10
2 20.16 6.69 1.915 0.25( 0.02) 0.10 10.1 3.10
3 20.33 7.23 1.832 0.25( 0.03) 0.10 10.7 2.10
4 20.25 9.14 1.602 0.25( 0.03) 0.10 12.4 1.10
5 20.14 9.35 1.581 0.25( 0.03) 0.10 12.6 4.10
6 18.06 11.27 1.420 0.25( 0.03) 0.10 12.6 5.10
TOTAL AREA(ACRES) = 12.6
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 20.33 Tc(MIN.) = 7.229
EFFECTIVE AREA(ACRES) = 10.68 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 12.6
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 6.40 = 1089.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 7.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 767.66 DOWNSTREAM(FEET) = 766.79 FLOW LENGTH(FEET) = 134.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 27.0 INCH PIPE IS 18.9 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.85
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 20.33
PIPE TRAVEL TIME(MIN.) = 0.33 Tc(MIN.) = 7.56
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 7.40 = 1223.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 7.40 TO NODE 7.40 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 7.56
RAINFALL INTENSITY(INCH/HR) = 1.79
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 10.68
TOTAL STREAM AREA(ACRES) = 12.64
PEAK FLOW RATE(CFS) AT CONFLUENCE = 20.33
**************************************************************************** FLOW PROCESS FROM NODE 7.10 TO NODE 7.20 IS CODE = 21
Item: 11
1381
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 330.00
ELEVATION DATA: UPSTREAM(FEET) = 784.05 DOWNSTREAM(FEET) = 779.87 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 7.409
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.806
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 0.70 0.25 0.100 69 7.41
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 1.12
TOTAL AREA(ACRES) = 0.70 PEAK FLOW RATE(CFS) = 1.12
**************************************************************************** FLOW PROCESS FROM NODE 7.20 TO NODE 7.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 779.87 DOWNSTREAM(FEET) = 776.41 CHANNEL LENGTH THRU SUBAREA(FEET) = 323.00 CHANNEL SLOPE = 0.0107 CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.465
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 2.31 0.25 0.100 69
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 2.62
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 1.65 AVERAGE FLOW DEPTH(FEET) = 0.10 TRAVEL TIME(MIN.) = 3.26 Tc(MIN.) = 10.67
SUBAREA AREA(ACRES) = 2.31 SUBAREA RUNOFF(CFS) = 2.99
EFFECTIVE AREA(ACRES) = 3.01 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 3.0 PEAK FLOW RATE(CFS) = 3.90
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.12 FLOW VELOCITY(FEET/SEC.) = 1.80
LONGEST FLOWPATH FROM NODE 7.10 TO NODE 7.30 = 653.00 FEET. **************************************************************************** Item: 11
1382
FLOW PROCESS FROM NODE 7.30 TO NODE 7.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 773.00 DOWNSTREAM(FEET) = 771.55 FLOW LENGTH(FEET) = 145.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 15.0 INCH PIPE IS 8.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 5.40
ESTIMATED PIPE DIAMETER(INCH) = 15.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 3.90
PIPE TRAVEL TIME(MIN.) = 0.45 Tc(MIN.) = 11.12
LONGEST FLOWPATH FROM NODE 7.10 TO NODE 7.40 = 798.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 7.40 TO NODE 7.40 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 11.12
RAINFALL INTENSITY(INCH/HR) = 1.43
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 3.01
TOTAL STREAM AREA(ACRES) = 3.01
PEAK FLOW RATE(CFS) AT CONFLUENCE = 3.90
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 19.96 6.80 1.898 0.25( 0.02) 0.10 9.8 6.10
1 20.16 7.02 1.863 0.25( 0.02) 0.10 10.1 3.10
1 20.33 7.56 1.786 0.25( 0.03) 0.10 10.7 2.10
1 20.25 9.46 1.570 0.25( 0.03) 0.10 12.4 1.10
1 20.14 9.67 1.550 0.25( 0.03) 0.10 12.6 4.10
1 18.06 11.60 1.396 0.25( 0.03) 0.10 12.6 5.10
2 3.90 11.12 1.431 0.25( 0.03) 0.10 3.0 7.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 23.13 6.80 1.898 0.25( 0.02) 0.10 11.6 6.10
2 23.38 7.02 1.863 0.25( 0.02) 0.10 12.0 3.10
Item: 11
1383
3 23.65 7.56 1.786 0.25( 0.03) 0.10 12.7 2.10
4 23.89 9.46 1.570 0.25( 0.03) 0.10 15.0 1.10
5 23.82 9.67 1.550 0.25( 0.03) 0.10 15.2 4.10
6 22.48 11.12 1.431 0.25( 0.03) 0.10 15.6 7.10
7 21.86 11.60 1.396 0.25( 0.03) 0.10 15.6 5.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 23.89 Tc(MIN.) = 9.46
EFFECTIVE AREA(ACRES) = 15.00 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 15.6
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 7.40 = 1223.40 FEET. ============================================================================ END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 15.6 TC(MIN.) = 9.46
EFFECTIVE AREA(ACRES) = 15.00 AREA-AVERAGED Fm(INCH/HR)= 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.100 PEAK FLOW RATE(CFS) = 23.89
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 23.13 6.80 1.898 0.25( 0.02) 0.10 11.6 6.10
2 23.38 7.02 1.863 0.25( 0.02) 0.10 12.0 3.10
3 23.65 7.56 1.786 0.25( 0.03) 0.10 12.7 2.10
4 23.89 9.46 1.570 0.25( 0.03) 0.10 15.0 1.10
5 23.82 9.67 1.550 0.25( 0.03) 0.10 15.2 4.10
6 22.48 11.12 1.431 0.25( 0.03) 0.10 15.6 7.10
7 21.86 11.60 1.396 0.25( 0.03) 0.10 15.6 5.10
============================================================================ ============================================================================
END OF RATIONAL METHOD ANALYSIS
Item: 11
1384
____________________________________________________________________________ ****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
(Reference: 1986 ORANGE COUNTY HYDROLOGY CRITERION)
(c) Copyright 1983-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
************************** DESCRIPTION OF STUDY ************************** * COSTCO FOOTHILL RANCH *
* PROPOSED 100 YEAR RATIONAL METHOD *
* KIMLEY-HORN *
************************************************************************** FILE NAME: FRRM2YP.DAT
TIME/DATE OF STUDY: 10:46 09/18/2025
============================================================================ USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
============================================================================ --*TIME-OF-CONCENTRATION MODEL*--
USER SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 6.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *DATA BANK RAINFALL USED*
*ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD* *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING
WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n)
=== ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0312 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS:
1. Relative Flow-Depth = 0.00 FEET
as (Maximum Allowable Street Flow Depth) - (Top-of-Curb)
2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
*USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED **************************************************************************** FLOW PROCESS FROM NODE 1.10 TO NODE 1.20 IS CODE = 21
Item: 11
1385
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 330.00
ELEVATION DATA: UPSTREAM(FEET) = 785.09 DOWNSTREAM(FEET) = 780.16 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 7.168
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.033
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 2.72 0.25 0.100 69 7.17
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 12.26
TOTAL AREA(ACRES) = 2.72 PEAK FLOW RATE(CFS) = 12.26
**************************************************************************** FLOW PROCESS FROM NODE 1.20 TO NODE 2.20 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 775.54 DOWNSTREAM(FEET) = 774.90 FLOW LENGTH(FEET) = 128.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 24.0 INCH PIPE IS 16.0 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 5.50
ESTIMATED PIPE DIAMETER(INCH) = 24.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 12.26
PIPE TRAVEL TIME(MIN.) = 0.39 Tc(MIN.) = 7.56
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 2.20 = 458.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 2.20 TO NODE 2.20 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 7.56
RAINFALL INTENSITY(INCH/HR) = 4.88
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 2.72
TOTAL STREAM AREA(ACRES) = 2.72
PEAK FLOW RATE(CFS) AT CONFLUENCE = 12.26
Item: 11
1386
**************************************************************************** FLOW PROCESS FROM NODE 2.10 TO NODE 2.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 220.00
ELEVATION DATA: UPSTREAM(FEET) = 784.75 DOWNSTREAM(FEET) = 780.45 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.776
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.696
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 1.49 0.25 0.100 69 5.78
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 7.61
TOTAL AREA(ACRES) = 1.49 PEAK FLOW RATE(CFS) = 7.61
**************************************************************************** FLOW PROCESS FROM NODE 2.20 TO NODE 2.20 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 5.78
RAINFALL INTENSITY(INCH/HR) = 5.70
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 1.49
TOTAL STREAM AREA(ACRES) = 1.49
PEAK FLOW RATE(CFS) AT CONFLUENCE = 7.61
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 12.26 7.56 4.884 0.25( 0.03) 0.10 2.7 1.10
2 7.61 5.78 5.696 0.25( 0.03) 0.10 1.5 2.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
Item: 11
1387
1 18.54 5.78 5.696 0.25( 0.03) 0.10 3.6 2.10
2 18.78 7.56 4.884 0.25( 0.03) 0.10 4.2 1.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 18.78 Tc(MIN.) = 7.56
EFFECTIVE AREA(ACRES) = 4.21 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 4.2
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 2.20 = 458.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 2.30 TO NODE 3.30 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 774.80 DOWNSTREAM(FEET) = 773.75 FLOW LENGTH(FEET) = 136.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 24.0 INCH PIPE IS 19.0 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 7.03
ESTIMATED PIPE DIAMETER(INCH) = 24.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 18.78
PIPE TRAVEL TIME(MIN.) = 0.32 Tc(MIN.) = 7.88
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 3.30 = 594.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 3.30 TO NODE 3.30 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 7.88
RAINFALL INTENSITY(INCH/HR) = 4.77
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 4.21
TOTAL STREAM AREA(ACRES) = 4.21
PEAK FLOW RATE(CFS) AT CONFLUENCE = 18.78
**************************************************************************** FLOW PROCESS FROM NODE 3.10 TO NODE 3.20 IS CODE = 22
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>>>>USE SPECIFIED Tc VALUE FOR INITIAL SUBAREA<<<
============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 136.00
USER SPECIFIED Tc(MIN.) = 5.000
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 6.187
Item: 11
1388
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 2.31 0.25 0.100 69
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 12.81
TOTAL AREA(ACRES) = 2.31 PEAK FLOW RATE(CFS) = 12.81
**************************************************************************** FLOW PROCESS FROM NODE 3.20 TO NODE 3.30 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 778.22 DOWNSTREAM(FEET) = 773.75 FLOW LENGTH(FEET) = 265.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 18.0 INCH PIPE IS 14.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 8.57
ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 12.81
PIPE TRAVEL TIME(MIN.) = 0.52 Tc(MIN.) = 5.52
LONGEST FLOWPATH FROM NODE 3.10 TO NODE 3.30 = 401.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 3.30 TO NODE 3.30 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 5.52
RAINFALL INTENSITY(INCH/HR) = 5.85
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 2.31
TOTAL STREAM AREA(ACRES) = 2.31
PEAK FLOW RATE(CFS) AT CONFLUENCE = 12.81
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 18.54 6.10 5.522 0.25( 0.03) 0.10 3.6 2.10
1 18.78 7.88 4.768 0.25( 0.03) 0.10 4.2 1.10
2 12.81 5.52 5.849 0.25( 0.03) 0.10 2.3 3.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
Item: 11
1389
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 30.58 5.52 5.849 0.25( 0.03) 0.10 5.5 3.10
2 30.64 6.10 5.522 0.25( 0.03) 0.10 5.9 2.10
3 29.21 7.88 4.768 0.25( 0.03) 0.10 6.5 1.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 30.64 Tc(MIN.) = 6.10
EFFECTIVE AREA(ACRES) = 5.88 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 6.5
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 3.30 = 594.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 3.30 TO NODE 4.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 773.65 DOWNSTREAM(FEET) = 769.47 FLOW LENGTH(FEET) = 97.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 21.0 INCH PIPE IS 16.4 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 15.17
ESTIMATED PIPE DIAMETER(INCH) = 21.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 30.64
PIPE TRAVEL TIME(MIN.) = 0.11 Tc(MIN.) = 6.21
LONGEST FLOWPATH FROM NODE 1.10 TO NODE 4.40 = 691.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.40 TO NODE 4.40 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 6.21
RAINFALL INTENSITY(INCH/HR) = 5.47
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 5.88
TOTAL STREAM AREA(ACRES) = 6.52
PEAK FLOW RATE(CFS) AT CONFLUENCE = 30.64
**************************************************************************** FLOW PROCESS FROM NODE 4.10 TO NODE 4.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
Item: 11
1390
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 214.00
ELEVATION DATA: UPSTREAM(FEET) = 784.71 DOWNSTREAM(FEET) = 780.40 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.678
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.752
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 1.36 0.25 0.100 69 5.68
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 7.01
TOTAL AREA(ACRES) = 1.36 PEAK FLOW RATE(CFS) = 7.01
**************************************************************************** FLOW PROCESS FROM NODE 4.20 TO NODE 4.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 780.40 DOWNSTREAM(FEET) = 775.74 CHANNEL LENGTH THRU SUBAREA(FEET) = 237.00 CHANNEL SLOPE = 0.0197 CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.136
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 3.09 0.25 0.100 69
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 14.11
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 3.18 AVERAGE FLOW DEPTH(FEET) = 0.19 TRAVEL TIME(MIN.) = 1.24 Tc(MIN.) = 6.92
SUBAREA AREA(ACRES) = 3.09 SUBAREA RUNOFF(CFS) = 14.21
EFFECTIVE AREA(ACRES) = 4.45 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 4.4 PEAK FLOW RATE(CFS) = 20.47
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.22 FLOW VELOCITY(FEET/SEC.) = 3.36
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.30 = 451.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.30 TO NODE 4.40 IS CODE = 31
---------------------------------------------------------------------------- Item: 11
1391
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 771.14 DOWNSTREAM(FEET) = 769.66 FLOW LENGTH(FEET) = 296.40 MANNING'S N = 0.013
DEPTH OF FLOW IN 27.0 INCH PIPE IS 21.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.11
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 20.47
PIPE TRAVEL TIME(MIN.) = 0.81 Tc(MIN.) = 7.73
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.40 = 747.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.40 TO NODE 4.40 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 7.73
RAINFALL INTENSITY(INCH/HR) = 4.82
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 4.45
TOTAL STREAM AREA(ACRES) = 4.45
PEAK FLOW RATE(CFS) AT CONFLUENCE = 20.47
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 30.58 5.62 5.785 0.25( 0.03) 0.10 5.5 3.10
1 30.64 6.21 5.467 0.25( 0.03) 0.10 5.9 2.10
1 29.21 7.99 4.731 0.25( 0.03) 0.10 6.5 1.10
2 20.47 7.73 4.821 0.25( 0.03) 0.10 4.4 4.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 48.47 5.62 5.785 0.25( 0.03) 0.10 8.8 3.10
2 49.29 6.21 5.467 0.25( 0.03) 0.10 9.5 2.10
3 49.89 7.73 4.821 0.25( 0.03) 0.10 10.9 4.10
4 49.30 7.99 4.731 0.25( 0.03) 0.10 11.0 1.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 49.89 Tc(MIN.) = 7.73
Item: 11
1392
EFFECTIVE AREA(ACRES) = 10.88 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 11.0
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.40 = 747.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 4.40 TO NODE 6.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 769.66 DOWNSTREAM(FEET) = 767.76 FLOW LENGTH(FEET) = 342.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 39.0 INCH PIPE IS 27.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 8.09
ESTIMATED PIPE DIAMETER(INCH) = 39.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 49.89
PIPE TRAVEL TIME(MIN.) = 0.70 Tc(MIN.) = 8.43
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 6.40 = 1089.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 10
---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 13
---------------------------------------------------------------------------- >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<<
============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 5.10 TO NODE 5.20 IS CODE = 21
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 229.00
ELEVATION DATA: UPSTREAM(FEET) = 784.59 DOWNSTREAM(FEET) = 784.09 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 9.099
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.390
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 0.41 0.25 0.100 69 9.10
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
Item: 11
1393
SUBAREA RUNOFF(CFS) = 1.61
TOTAL AREA(ACRES) = 0.41 PEAK FLOW RATE(CFS) = 1.61
**************************************************************************** FLOW PROCESS FROM NODE 5.20 TO NODE 6.30 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 779.49 DOWNSTREAM(FEET) = 778.11 FLOW LENGTH(FEET) = 142.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 12.0 INCH PIPE IS 5.8 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 4.30
ESTIMATED PIPE DIAMETER(INCH) = 12.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 1.61
PIPE TRAVEL TIME(MIN.) = 0.55 Tc(MIN.) = 9.65
LONGEST FLOWPATH FROM NODE 5.10 TO NODE 6.30 = 371.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.30 TO NODE 6.30 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 9.65
RAINFALL INTENSITY(INCH/HR) = 4.25
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 0.41
TOTAL STREAM AREA(ACRES) = 0.41
PEAK FLOW RATE(CFS) AT CONFLUENCE = 1.61
**************************************************************************** FLOW PROCESS FROM NODE 6.10 TO NODE 6.20 IS CODE = 22
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>>>>USE SPECIFIED Tc VALUE FOR INITIAL SUBAREA<<<
============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 142.00
USER SPECIFIED Tc(MIN.) = 5.000
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 6.187
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 1.26 0.25 0.100 69
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 6.99
Item: 11
1394
TOTAL AREA(ACRES) = 1.26 PEAK FLOW RATE(CFS) = 6.99
**************************************************************************** FLOW PROCESS FROM NODE 6.20 TO NODE 6.30 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 778.22 DOWNSTREAM(FEET) = 778.11 FLOW LENGTH(FEET) = 22.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 18.0 INCH PIPE IS 14.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 4.67
ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 6.99
PIPE TRAVEL TIME(MIN.) = 0.08 Tc(MIN.) = 5.08
LONGEST FLOWPATH FROM NODE 6.10 TO NODE 6.30 = 164.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.30 TO NODE 6.30 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 5.08
RAINFALL INTENSITY(INCH/HR) = 6.13
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 1.26
TOTAL STREAM AREA(ACRES) = 1.26
PEAK FLOW RATE(CFS) AT CONFLUENCE = 6.99
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 1.61 9.65 4.245 0.25( 0.03) 0.10 0.4 5.10
2 6.99 5.08 6.132 0.25( 0.03) 0.10 1.3 6.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 8.21 5.08 6.132 0.25( 0.03) 0.10 1.5 6.10
2 6.44 9.65 4.245 0.25( 0.03) 0.10 1.7 5.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
Item: 11
1395
PEAK FLOW RATE(CFS) = 8.21 Tc(MIN.) = 5.08
EFFECTIVE AREA(ACRES) = 1.48 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 1.7
LONGEST FLOWPATH FROM NODE 5.10 TO NODE 6.30 = 371.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.30 TO NODE 6.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 778.11 DOWNSTREAM(FEET) = 767.76 FLOW LENGTH(FEET) = 534.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 15.0 INCH PIPE IS 11.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 8.11
ESTIMATED PIPE DIAMETER(INCH) = 15.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 8.21
PIPE TRAVEL TIME(MIN.) = 1.10 Tc(MIN.) = 6.18
LONGEST FLOWPATH FROM NODE 5.10 TO NODE 6.40 = 905.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 10
---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 3 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 11
---------------------------------------------------------------------------- >>>>>CONFLUENCE MEMORY BANK # 1 WITH THE MAIN-STREAM MEMORY<<<<< ============================================================================ ** MAIN STREAM CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 8.21 6.18 5.482 0.25( 0.03) 0.10 1.5 6.10
2 6.44 10.79 3.982 0.25( 0.03) 0.10 1.7 5.10
LONGEST FLOWPATH FROM NODE 5.10 TO NODE 6.40 = 905.00 FEET. ** MEMORY BANK # 1 CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 48.47 6.33 5.405 0.25( 0.03) 0.10 8.8 3.10
2 49.29 6.91 5.140 0.25( 0.03) 0.10 9.5 2.10
3 49.89 8.43 4.586 0.25( 0.03) 0.10 10.9 4.10
4 49.30 8.69 4.507 0.25( 0.03) 0.10 11.0 1.10
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 6.40 = 1089.40 FEET. ** PEAK FLOW RATE TABLE **
Item: 11
1396
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 56.17 6.18 5.482 0.25( 0.03) 0.10 10.0 6.10
2 56.62 6.33 5.405 0.25( 0.03) 0.10 10.3 3.10
3 57.22 6.91 5.140 0.25( 0.03) 0.10 11.0 2.10
4 57.23 8.43 4.586 0.25( 0.03) 0.10 12.4 4.10
5 56.54 8.69 4.507 0.25( 0.03) 0.10 12.6 1.10
6 49.96 10.79 3.982 0.25( 0.03) 0.10 12.6 5.10
TOTAL AREA(ACRES) = 12.6
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 57.23 Tc(MIN.) = 8.433
EFFECTIVE AREA(ACRES) = 12.45 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 12.6
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 6.40 = 1089.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 6.40 TO NODE 7.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 767.66 DOWNSTREAM(FEET) = 766.79 FLOW LENGTH(FEET) = 134.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 39.0 INCH PIPE IS 28.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 8.82
ESTIMATED PIPE DIAMETER(INCH) = 39.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 57.23
PIPE TRAVEL TIME(MIN.) = 0.25 Tc(MIN.) = 8.69
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 7.40 = 1223.40 FEET. **************************************************************************** FLOW PROCESS FROM NODE 7.40 TO NODE 7.40 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 8.69
RAINFALL INTENSITY(INCH/HR) = 4.51
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 12.45
TOTAL STREAM AREA(ACRES) = 12.64
PEAK FLOW RATE(CFS) AT CONFLUENCE = 57.23
**************************************************************************** FLOW PROCESS FROM NODE 7.10 TO NODE 7.20 IS CODE = 21
Item: 11
1397
---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
>>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ============================================================================ INITIAL SUBAREA FLOW-LENGTH(FEET) = 330.00
ELEVATION DATA: UPSTREAM(FEET) = 784.05 DOWNSTREAM(FEET) = 779.87 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20
SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 7.409
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.939
SUBAREA Tc AND LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.)
COMMERCIAL C 0.70 0.25 0.100 69 7.41
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
SUBAREA RUNOFF(CFS) = 3.10
TOTAL AREA(ACRES) = 0.70 PEAK FLOW RATE(CFS) = 3.10
**************************************************************************** FLOW PROCESS FROM NODE 7.20 TO NODE 7.30 IS CODE = 51
---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 779.87 DOWNSTREAM(FEET) = 776.41 CHANNEL LENGTH THRU SUBAREA(FEET) = 323.00 CHANNEL SLOPE = 0.0107 CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 99.000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
* 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.168
SUBAREA LOSS RATE DATA(AMC II):
DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS
LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN
COMMERCIAL C 2.31 0.25 0.100 69
SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.25
SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 7.42
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 2.11 AVERAGE FLOW DEPTH(FEET) = 0.16 TRAVEL TIME(MIN.) = 2.56 Tc(MIN.) = 9.96
SUBAREA AREA(ACRES) = 2.31 SUBAREA RUNOFF(CFS) = 8.61
EFFECTIVE AREA(ACRES) = 3.01 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 3.0 PEAK FLOW RATE(CFS) = 11.22
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.20 FLOW VELOCITY(FEET/SEC.) = 2.36
LONGEST FLOWPATH FROM NODE 7.10 TO NODE 7.30 = 653.00 FEET. **************************************************************************** Item: 11
1398
FLOW PROCESS FROM NODE 7.30 TO NODE 7.40 IS CODE = 31
---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 773.00 DOWNSTREAM(FEET) = 771.55 FLOW LENGTH(FEET) = 145.00 MANNING'S N = 0.013
DEPTH OF FLOW IN 21.0 INCH PIPE IS 13.3 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 7.00
ESTIMATED PIPE DIAMETER(INCH) = 21.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 11.22
PIPE TRAVEL TIME(MIN.) = 0.35 Tc(MIN.) = 10.31
LONGEST FLOWPATH FROM NODE 7.10 TO NODE 7.40 = 798.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 7.40 TO NODE 7.40 IS CODE = 1
---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 10.31
RAINFALL INTENSITY(INCH/HR) = 4.09
AREA-AVERAGED Fm(INCH/HR) = 0.03
AREA-AVERAGED Fp(INCH/HR) = 0.25
AREA-AVERAGED Ap = 0.10
EFFECTIVE STREAM AREA(ACRES) = 3.01
TOTAL STREAM AREA(ACRES) = 3.01
PEAK FLOW RATE(CFS) AT CONFLUENCE = 11.22
** CONFLUENCE DATA **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 56.17 6.43 5.357 0.25( 0.03) 0.10 10.0 6.10
1 56.62 6.58 5.285 0.25( 0.03) 0.10 10.3 3.10
1 57.22 7.16 5.035 0.25( 0.03) 0.10 11.0 2.10
1 57.23 8.69 4.509 0.25( 0.03) 0.10 12.4 4.10
1 56.54 8.95 4.433 0.25( 0.03) 0.10 12.6 1.10
1 49.96 11.05 3.927 0.25( 0.03) 0.10 12.6 5.10
2 11.22 10.31 4.087 0.25( 0.03) 0.10 3.0 7.10
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 65.36 6.43 5.357 0.25( 0.03) 0.10 11.9 6.10
2 65.90 6.58 5.285 0.25( 0.03) 0.10 12.2 3.10
Item: 11
1399
3 66.84 7.16 5.035 0.25( 0.03) 0.10 13.1 2.10
4 67.67 8.69 4.509 0.25( 0.03) 0.10 15.0 4.10
5 67.11 8.95 4.433 0.25( 0.03) 0.10 15.2 1.10
6 63.51 10.31 4.087 0.25( 0.03) 0.10 15.6 7.10
7 60.74 11.05 3.927 0.25( 0.03) 0.10 15.6 5.10
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 67.67 Tc(MIN.) = 8.69
EFFECTIVE AREA(ACRES) = 14.98 AREA-AVERAGED Fm(INCH/HR) = 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 15.6
LONGEST FLOWPATH FROM NODE 4.10 TO NODE 7.40 = 1223.40 FEET. ============================================================================ END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 15.6 TC(MIN.) = 8.69
EFFECTIVE AREA(ACRES) = 14.98 AREA-AVERAGED Fm(INCH/HR)= 0.03 AREA-AVERAGED Fp(INCH/HR) = 0.25 AREA-AVERAGED Ap = 0.100 PEAK FLOW RATE(CFS) = 67.67
** PEAK FLOW RATE TABLE **
STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER
NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE
1 65.36 6.43 5.357 0.25( 0.03) 0.10 11.9 6.10
2 65.90 6.58 5.285 0.25( 0.03) 0.10 12.2 3.10
3 66.84 7.16 5.035 0.25( 0.03) 0.10 13.1 2.10
4 67.67 8.69 4.509 0.25( 0.03) 0.10 15.0 4.10
5 67.11 8.95 4.433 0.25( 0.03) 0.10 15.2 1.10
6 63.51 10.31 4.087 0.25( 0.03) 0.10 15.6 7.10
7 60.74 11.05 3.927 0.25( 0.03) 0.10 15.6 5.10
============================================================================ ============================================================================
END OF RATIONAL METHOD ANALYSIS
Item: 11
1400
14 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix F - Unit Hydrograph Analysis
Item: 11
1401
____________________________________________________________________________ ****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================ (C) Copyright 1989-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
**************************************************************************** ---------------------------------------------------------------------------- Problem Descriptions:
COSTCO FOOTHILL RANCH
EXISTING DA A 2 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------------------- RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 1.45
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.250
TIME OF CONCENTRATION(MIN.) = 6.40
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 2
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19
30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40
1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53
3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89
6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22
24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.22
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.03
**************************************************************************** TIME VOLUME Q 0. 2.5 5.0 7.5 10.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.11 0.0002 0.04 Q . . . .
0.21 0.0006 0.04 Q . . . .
Item: 11
1402
0.32 0.0009 0.04 Q . . . .
0.43 0.0013 0.04 Q . . . .
0.53 0.0017 0.04 Q . . . .
0.64 0.0020 0.04 Q . . . .
0.75 0.0024 0.04 Q . . . .
0.85 0.0028 0.04 Q . . . .
0.96 0.0032 0.04 Q . . . .
1.07 0.0036 0.04 Q . . . .
1.17 0.0039 0.04 Q . . . .
1.28 0.0043 0.04 Q . . . .
1.39 0.0047 0.04 Q . . . .
1.49 0.0051 0.04 Q . . . .
1.60 0.0055 0.04 Q . . . .
1.71 0.0059 0.04 Q . . . .
1.81 0.0063 0.04 Q . . . .
1.92 0.0067 0.04 Q . . . .
2.03 0.0071 0.05 Q . . . .
2.13 0.0075 0.05 Q . . . .
2.24 0.0079 0.05 Q . . . .
2.35 0.0083 0.05 Q . . . .
2.45 0.0087 0.05 Q . . . .
2.56 0.0091 0.05 Q . . . .
2.67 0.0095 0.05 Q . . . .
2.77 0.0099 0.05 Q . . . .
2.88 0.0103 0.05 Q . . . .
2.99 0.0107 0.05 Q . . . .
3.09 0.0112 0.05 Q . . . .
3.20 0.0116 0.05 Q . . . .
3.31 0.0120 0.05 Q . . . .
3.41 0.0124 0.05 Q . . . .
3.52 0.0129 0.05 Q . . . .
3.63 0.0133 0.05 Q . . . .
3.73 0.0137 0.05 Q . . . .
3.84 0.0142 0.05 Q . . . .
3.95 0.0146 0.05 Q . . . .
4.05 0.0150 0.05 Q . . . .
4.16 0.0155 0.05 Q . . . .
4.27 0.0159 0.05 Q . . . .
4.37 0.0164 0.05 Q . . . .
4.48 0.0168 0.05 Q . . . .
4.59 0.0173 0.05 Q . . . .
4.69 0.0177 0.05 Q . . . .
4.80 0.0182 0.05 Q . . . .
4.91 0.0186 0.05 Q . . . .
5.01 0.0191 0.05 Q . . . .
5.12 0.0196 0.05 Q . . . .
5.23 0.0200 0.05 Q . . . .
5.33 0.0205 0.05 Q . . . .
5.44 0.0210 0.05 Q . . . .
5.55 0.0214 0.05 Q . . . .
Item: 11
1403
5.65 0.0219 0.05 Q . . . .
5.76 0.0224 0.05 Q . . . .
5.87 0.0229 0.06 Q . . . .
5.97 0.0234 0.06 Q . . . .
6.08 0.0239 0.06 Q . . . .
6.19 0.0244 0.06 Q . . . .
6.29 0.0249 0.06 Q . . . .
6.40 0.0254 0.06 Q . . . .
6.51 0.0259 0.06 Q . . . .
6.61 0.0264 0.06 Q . . . .
6.72 0.0269 0.06 Q . . . .
6.83 0.0274 0.06 Q . . . .
6.93 0.0279 0.06 Q . . . .
7.04 0.0284 0.06 Q . . . .
7.15 0.0290 0.06 Q . . . .
7.25 0.0295 0.06 Q . . . .
7.36 0.0300 0.06 Q . . . .
7.47 0.0306 0.06 Q . . . .
7.57 0.0311 0.06 Q . . . .
7.68 0.0317 0.06 Q . . . .
7.79 0.0322 0.06 Q . . . .
7.89 0.0328 0.06 Q . . . .
8.00 0.0333 0.06 Q . . . .
8.11 0.0339 0.06 Q . . . .
8.21 0.0345 0.07 Q . . . .
8.32 0.0351 0.07 Q . . . .
8.43 0.0356 0.07 Q . . . .
8.53 0.0362 0.07 Q . . . .
8.64 0.0368 0.07 Q . . . .
8.75 0.0374 0.07 Q . . . .
8.85 0.0380 0.07 Q . . . .
8.96 0.0386 0.07 Q . . . .
9.07 0.0392 0.07 Q . . . .
9.17 0.0398 0.07 Q . . . .
9.28 0.0405 0.07 Q . . . .
9.39 0.0411 0.07 Q . . . .
9.49 0.0417 0.07 Q . . . .
9.60 0.0424 0.07 Q . . . .
9.71 0.0430 0.07 Q . . . .
9.81 0.0437 0.07 Q . . . .
9.92 0.0444 0.08 Q . . . .
10.03 0.0450 0.08 Q . . . .
10.13 0.0457 0.08 Q . . . .
10.24 0.0464 0.08 Q . . . .
10.35 0.0471 0.08 Q . . . .
10.45 0.0478 0.08 Q . . . .
10.56 0.0485 0.08 Q . . . .
10.67 0.0492 0.08 Q . . . .
10.77 0.0499 0.08 Q . . . .
10.88 0.0507 0.08 Q . . . .
Item: 11
1404
10.99 0.0514 0.09 Q . . . .
11.09 0.0522 0.09 Q . . . .
11.20 0.0530 0.09 Q . . . .
11.31 0.0537 0.09 Q . . . .
11.41 0.0545 0.09 Q . . . .
11.52 0.0553 0.09 Q . . . .
11.63 0.0561 0.09 Q . . . .
11.73 0.0570 0.09 Q . . . .
11.84 0.0578 0.10 Q . . . .
11.95 0.0586 0.10 Q . . . .
12.05 0.0595 0.10 Q . . . .
12.16 0.0605 0.12 Q . . . .
12.27 0.0616 0.12 Q . . . .
12.37 0.0627 0.13 Q . . . .
12.48 0.0638 0.13 Q . . . .
12.59 0.0650 0.13 Q . . . .
12.69 0.0661 0.13 Q . . . .
12.80 0.0673 0.13 Q . . . .
12.91 0.0685 0.14 Q . . . .
13.01 0.0697 0.14 Q . . . .
13.12 0.0709 0.14 Q . . . .
13.23 0.0722 0.14 Q . . . .
13.33 0.0735 0.15 Q . . . .
13.44 0.0748 0.15 Q . . . .
13.55 0.0762 0.16 Q . . . .
13.65 0.0775 0.16 Q . . . .
13.76 0.0790 0.16 Q . . . .
13.87 0.0804 0.17 Q . . . .
13.97 0.0819 0.17 Q . . . .
14.08 0.0834 0.18 Q . . . .
14.19 0.0850 0.19 Q . . . .
14.29 0.0867 0.19 Q . . . .
14.40 0.0884 0.20 Q . . . .
14.51 0.0902 0.21 Q . . . .
14.61 0.0921 0.22 Q . . . .
14.72 0.0940 0.22 Q . . . .
14.83 0.0960 0.23 Q . . . .
14.93 0.0981 0.24 Q . . . .
15.04 0.1003 0.26 .Q . . . .
15.15 0.1027 0.27 .Q . . . .
15.25 0.1051 0.29 .Q . . . .
15.36 0.1078 0.31 .Q . . . .
15.47 0.1105 0.30 .Q . . . .
15.57 0.1132 0.32 .Q . . . .
15.68 0.1163 0.39 .Q . . . .
15.79 0.1200 0.44 .Q . . . .
15.89 0.1247 0.63 . Q . . . .
16.00 0.1312 0.86 . Q . . . .
16.11 0.1464 2.58 . Q . . .
16.21 0.1600 0.52 . Q . . . .
Item: 11
1405
16.32 0.1638 0.35 .Q . . . .
16.43 0.1667 0.31 .Q . . . .
16.53 0.1693 0.28 .Q . . . .
16.64 0.1717 0.25 .Q . . . .
16.75 0.1738 0.23 Q . . . .
16.85 0.1757 0.21 Q . . . .
16.96 0.1775 0.20 Q . . . .
17.07 0.1792 0.18 Q . . . .
17.17 0.1807 0.17 Q . . . .
17.28 0.1822 0.16 Q . . . .
17.39 0.1836 0.15 Q . . . .
17.49 0.1849 0.15 Q . . . .
17.60 0.1861 0.14 Q . . . .
17.71 0.1874 0.14 Q . . . .
17.81 0.1885 0.13 Q . . . .
17.92 0.1897 0.13 Q . . . .
18.03 0.1908 0.12 Q . . . .
18.13 0.1917 0.10 Q . . . .
18.24 0.1926 0.09 Q . . . .
18.35 0.1934 0.09 Q . . . .
18.45 0.1942 0.09 Q . . . .
18.56 0.1950 0.09 Q . . . .
18.67 0.1957 0.08 Q . . . .
18.77 0.1965 0.08 Q . . . .
18.88 0.1972 0.08 Q . . . .
18.99 0.1979 0.08 Q . . . .
19.09 0.1986 0.08 Q . . . .
19.20 0.1993 0.08 Q . . . .
19.31 0.1999 0.07 Q . . . .
19.41 0.2006 0.07 Q . . . .
19.52 0.2012 0.07 Q . . . .
19.63 0.2018 0.07 Q . . . .
19.73 0.2024 0.07 Q . . . .
19.84 0.2030 0.07 Q . . . .
19.95 0.2036 0.07 Q . . . .
20.05 0.2042 0.06 Q . . . .
20.16 0.2047 0.06 Q . . . .
20.27 0.2053 0.06 Q . . . .
20.37 0.2059 0.06 Q . . . .
20.48 0.2064 0.06 Q . . . .
20.59 0.2069 0.06 Q . . . .
20.69 0.2074 0.06 Q . . . .
20.80 0.2080 0.06 Q . . . .
20.91 0.2085 0.06 Q . . . .
21.01 0.2090 0.06 Q . . . .
21.12 0.2095 0.06 Q . . . .
21.23 0.2100 0.06 Q . . . .
21.33 0.2104 0.05 Q . . . .
21.44 0.2109 0.05 Q . . . .
21.55 0.2114 0.05 Q . . . .
Item: 11
1406
21.65 0.2119 0.05 Q . . . .
21.76 0.2123 0.05 Q . . . .
21.87 0.2128 0.05 Q . . . .
21.97 0.2132 0.05 Q . . . .
22.08 0.2137 0.05 Q . . . .
22.19 0.2141 0.05 Q . . . .
22.29 0.2145 0.05 Q . . . .
22.40 0.2150 0.05 Q . . . .
22.51 0.2154 0.05 Q . . . .
22.61 0.2158 0.05 Q . . . .
22.72 0.2162 0.05 Q . . . .
22.83 0.2166 0.05 Q . . . .
22.93 0.2170 0.05 Q . . . .
23.04 0.2174 0.05 Q . . . .
23.15 0.2178 0.05 Q . . . .
23.25 0.2182 0.04 Q . . . .
23.36 0.2186 0.04 Q . . . .
23.47 0.2190 0.04 Q . . . .
23.57 0.2194 0.04 Q . . . .
23.68 0.2198 0.04 Q . . . .
23.79 0.2202 0.04 Q . . . .
23.89 0.2205 0.04 Q . . . .
24.00 0.2209 0.04 Q . . . .
24.11 0.2211 0.00 Q . . . .
---------------------------------------------------------------------------- -------------------------------------------------------------------------------- TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1440.0
10% 96.0
20% 25.6
30% 12.8
40% 6.4
50% 6.4
60% 6.4
70% 6.4
80% 6.4
90% 6.4
Item: 11
1407
____________________________________________________________________________ ****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================ (C) Copyright 1989-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
**************************************************************************** ---------------------------------------------------------------------------- Problem Descriptions:
COSTCO FOOTHILL RANCH
EXISTING DA B 2 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------------------- RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 6.28
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.131
TIME OF CONCENTRATION(MIN.) = 8.82
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 2
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19
30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40
1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53
3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89
6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22
24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.96
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.11
**************************************************************************** TIME VOLUME Q 0. 2.5 5.0 7.5 10.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.12 0.0011 0.18 Q . . . .
0.27 0.0033 0.18 Q . . . .
Item: 11
1408
0.42 0.0055 0.18 Q . . . .
0.57 0.0077 0.18 Q . . . .
0.71 0.0100 0.18 Q . . . .
0.86 0.0122 0.19 Q . . . .
1.01 0.0145 0.19 Q . . . .
1.15 0.0168 0.19 Q . . . .
1.30 0.0191 0.19 Q . . . .
1.45 0.0214 0.19 Q . . . .
1.59 0.0237 0.19 Q . . . .
1.74 0.0261 0.19 Q . . . .
1.89 0.0284 0.19 Q . . . .
2.04 0.0308 0.20 Q . . . .
2.18 0.0332 0.20 Q . . . .
2.33 0.0356 0.20 Q . . . .
2.48 0.0380 0.20 Q . . . .
2.62 0.0404 0.20 Q . . . .
2.77 0.0429 0.20 Q . . . .
2.92 0.0453 0.20 Q . . . .
3.06 0.0478 0.20 Q . . . .
3.21 0.0503 0.21 Q . . . .
3.36 0.0529 0.21 Q . . . .
3.51 0.0554 0.21 Q . . . .
3.65 0.0579 0.21 Q . . . .
3.80 0.0605 0.21 Q . . . .
3.95 0.0631 0.21 Q . . . .
4.09 0.0657 0.22 Q . . . .
4.24 0.0684 0.22 Q . . . .
4.39 0.0710 0.22 Q . . . .
4.53 0.0737 0.22 Q . . . .
4.68 0.0764 0.22 Q . . . .
4.83 0.0791 0.22 Q . . . .
4.98 0.0819 0.23 Q . . . .
5.12 0.0846 0.23 Q . . . .
5.27 0.0874 0.23 Q . . . .
5.42 0.0902 0.23 Q . . . .
5.56 0.0931 0.23 Q . . . .
5.71 0.0959 0.24 Q . . . .
5.86 0.0988 0.24 Q . . . .
6.00 0.1017 0.24 Q . . . .
6.15 0.1046 0.24 Q . . . .
6.30 0.1076 0.24 Q . . . .
6.45 0.1106 0.25 Q . . . .
6.59 0.1136 0.25 Q . . . .
6.74 0.1167 0.25 .Q . . . .
6.89 0.1198 0.25 .Q . . . .
7.03 0.1229 0.26 .Q . . . .
7.18 0.1260 0.26 .Q . . . .
7.33 0.1292 0.26 .Q . . . .
7.47 0.1324 0.27 .Q . . . .
7.62 0.1356 0.27 .Q . . . .
Item: 11
1409
7.77 0.1389 0.27 .Q . . . .
7.92 0.1422 0.27 .Q . . . .
8.06 0.1456 0.28 .Q . . . .
8.21 0.1490 0.28 .Q . . . .
8.36 0.1524 0.28 .Q . . . .
8.50 0.1559 0.29 .Q . . . .
8.65 0.1594 0.29 .Q . . . .
8.80 0.1630 0.30 .Q . . . .
8.94 0.1666 0.30 .Q . . . .
9.09 0.1702 0.30 .Q . . . .
9.24 0.1739 0.31 .Q . . . .
9.39 0.1777 0.31 .Q . . . .
9.53 0.1815 0.31 .Q . . . .
9.68 0.1853 0.32 .Q . . . .
9.83 0.1892 0.32 .Q . . . .
9.97 0.1932 0.33 .Q . . . .
10.12 0.1972 0.33 .Q . . . .
10.27 0.2013 0.34 .Q . . . .
10.41 0.2054 0.34 .Q . . . .
10.56 0.2097 0.35 .Q . . . .
10.71 0.2139 0.35 .Q . . . .
10.85 0.2183 0.36 .Q . . . .
11.00 0.2228 0.37 .Q . . . .
11.15 0.2273 0.38 .Q . . . .
11.30 0.2319 0.38 .Q . . . .
11.44 0.2366 0.39 .Q . . . .
11.59 0.2414 0.40 .Q . . . .
11.74 0.2462 0.41 .Q . . . .
11.88 0.2512 0.41 .Q . . . .
12.03 0.2563 0.43 .Q . . . .
12.18 0.2620 0.51 . Q . . . .
12.32 0.2684 0.54 . Q . . . .
12.47 0.2750 0.55 . Q . . . .
12.62 0.2817 0.56 . Q . . . .
12.77 0.2886 0.57 . Q . . . .
12.91 0.2957 0.59 . Q . . . .
13.06 0.3030 0.60 . Q . . . .
13.21 0.3104 0.62 . Q . . . .
13.35 0.3181 0.64 . Q . . . .
13.50 0.3260 0.66 . Q . . . .
13.65 0.3341 0.68 . Q . . . .
13.80 0.3425 0.71 . Q . . . .
13.94 0.3512 0.72 . Q . . . .
14.09 0.3602 0.77 . Q . . . .
14.24 0.3699 0.81 . Q . . . .
14.38 0.3800 0.86 . Q . . . .
14.53 0.3906 0.89 . Q . . . .
14.68 0.4017 0.95 . Q . . . .
14.82 0.4135 0.98 . Q . . . .
14.97 0.4259 1.07 . Q . . . .
Item: 11
1410
15.12 0.4393 1.12 . Q . . . .
15.27 0.4537 1.26 . Q . . . .
15.41 0.4695 1.34 . Q . . . .
15.56 0.4861 1.38 . Q . . . .
15.71 0.5039 1.56 . Q . . . .
15.85 0.5272 2.26 . Q. . . .
16.00 0.5597 3.09 . . Q . . .
16.15 0.6346 9.25 . . . . Q .
16.29 0.7019 1.83 . Q . . . .
16.44 0.7208 1.29 . Q . . . .
16.59 0.7358 1.19 . Q . . . .
16.73 0.7493 1.03 . Q . . . .
16.88 0.7610 0.91 . Q . . . .
17.03 0.7717 0.83 . Q . . . .
17.18 0.7812 0.74 . Q . . . .
17.32 0.7899 0.69 . Q . . . .
17.47 0.7981 0.65 . Q . . . .
17.62 0.8057 0.61 . Q . . . .
17.76 0.8130 0.58 . Q . . . .
17.91 0.8199 0.56 . Q . . . .
18.06 0.8265 0.53 . Q . . . .
18.20 0.8323 0.42 .Q . . . .
18.35 0.8373 0.40 .Q . . . .
18.50 0.8421 0.39 .Q . . . .
18.65 0.8467 0.37 .Q . . . .
18.79 0.8511 0.36 .Q . . . .
18.94 0.8554 0.35 .Q . . . .
19.09 0.8596 0.34 .Q . . . .
19.23 0.8636 0.33 .Q . . . .
19.38 0.8675 0.32 .Q . . . .
19.53 0.8713 0.31 .Q . . . .
19.67 0.8750 0.30 .Q . . . .
19.82 0.8786 0.29 .Q . . . .
19.97 0.8821 0.29 .Q . . . .
20.12 0.8855 0.28 .Q . . . .
20.26 0.8889 0.27 .Q . . . .
20.41 0.8922 0.27 .Q . . . .
20.56 0.8954 0.26 .Q . . . .
20.70 0.8985 0.26 .Q . . . .
20.85 0.9016 0.25 .Q . . . .
21.00 0.9046 0.25 Q . . . .
21.14 0.9076 0.24 Q . . . .
21.29 0.9105 0.24 Q . . . .
21.44 0.9134 0.23 Q . . . .
21.59 0.9162 0.23 Q . . . .
21.73 0.9189 0.23 Q . . . .
21.88 0.9217 0.22 Q . . . .
22.03 0.9243 0.22 Q . . . .
22.17 0.9270 0.22 Q . . . .
22.32 0.9296 0.21 Q . . . .
Item: 11
1411
22.47 0.9321 0.21 Q . . . .
22.61 0.9346 0.21 Q . . . .
22.76 0.9371 0.20 Q . . . .
22.91 0.9396 0.20 Q . . . .
23.06 0.9420 0.20 Q . . . .
23.20 0.9444 0.20 Q . . . .
23.35 0.9467 0.19 Q . . . .
23.50 0.9491 0.19 Q . . . .
23.64 0.9514 0.19 Q . . . .
23.79 0.9536 0.19 Q . . . .
23.94 0.9559 0.18 Q . . . .
24.08 0.9581 0.18 Q . . . .
24.23 0.9592 0.00 Q . . . .
---------------------------------------------------------------------------- -------------------------------------------------------------------------------- TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1446.5
10% 132.3
20% 26.5
30% 17.6
40% 8.8
50% 8.8
60% 8.8
70% 8.8
80% 8.8
90% 8.8
Item: 11
1412
____________________________________________________________________________ ****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================ (C) Copyright 1989-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
**************************************************************************** ---------------------------------------------------------------------------- Problem Descriptions:
COSTCO FOOTHILL RANCH
EXISTING DA C 2YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------------------- RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 3.48
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.131
TIME OF CONCENTRATION(MIN.) = 7.39
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 2
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19
30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40
1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53
3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89
6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22
24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.53
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.06
**************************************************************************** TIME VOLUME Q 0. 2.5 5.0 7.5 10.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.11 0.0005 0.10 Q . . . .
0.23 0.0015 0.10 Q . . . .
Item: 11
1413
0.36 0.0025 0.10 Q . . . .
0.48 0.0035 0.10 Q . . . .
0.60 0.0046 0.10 Q . . . .
0.73 0.0056 0.10 Q . . . .
0.85 0.0067 0.10 Q . . . .
0.97 0.0077 0.10 Q . . . .
1.10 0.0088 0.10 Q . . . .
1.22 0.0098 0.10 Q . . . .
1.34 0.0109 0.11 Q . . . .
1.47 0.0120 0.11 Q . . . .
1.59 0.0131 0.11 Q . . . .
1.71 0.0142 0.11 Q . . . .
1.84 0.0153 0.11 Q . . . .
1.96 0.0164 0.11 Q . . . .
2.08 0.0175 0.11 Q . . . .
2.21 0.0186 0.11 Q . . . .
2.33 0.0197 0.11 Q . . . .
2.45 0.0208 0.11 Q . . . .
2.57 0.0219 0.11 Q . . . .
2.70 0.0231 0.11 Q . . . .
2.82 0.0242 0.11 Q . . . .
2.94 0.0254 0.11 Q . . . .
3.07 0.0265 0.11 Q . . . .
3.19 0.0277 0.11 Q . . . .
3.31 0.0288 0.12 Q . . . .
3.44 0.0300 0.12 Q . . . .
3.56 0.0312 0.12 Q . . . .
3.68 0.0324 0.12 Q . . . .
3.81 0.0336 0.12 Q . . . .
3.93 0.0348 0.12 Q . . . .
4.05 0.0360 0.12 Q . . . .
4.18 0.0372 0.12 Q . . . .
4.30 0.0385 0.12 Q . . . .
4.42 0.0397 0.12 Q . . . .
4.55 0.0409 0.12 Q . . . .
4.67 0.0422 0.12 Q . . . .
4.79 0.0435 0.12 Q . . . .
4.92 0.0447 0.13 Q . . . .
5.04 0.0460 0.13 Q . . . .
5.16 0.0473 0.13 Q . . . .
5.28 0.0486 0.13 Q . . . .
5.41 0.0499 0.13 Q . . . .
5.53 0.0512 0.13 Q . . . .
5.65 0.0526 0.13 Q . . . .
5.78 0.0539 0.13 Q . . . .
5.90 0.0552 0.13 Q . . . .
6.02 0.0566 0.13 Q . . . .
6.15 0.0580 0.13 Q . . . .
6.27 0.0593 0.14 Q . . . .
6.39 0.0607 0.14 Q . . . .
Item: 11
1414
6.52 0.0621 0.14 Q . . . .
6.64 0.0635 0.14 Q . . . .
6.76 0.0650 0.14 Q . . . .
6.89 0.0664 0.14 Q . . . .
7.01 0.0678 0.14 Q . . . .
7.13 0.0693 0.14 Q . . . .
7.26 0.0708 0.15 Q . . . .
7.38 0.0722 0.15 Q . . . .
7.50 0.0737 0.15 Q . . . .
7.62 0.0752 0.15 Q . . . .
7.75 0.0768 0.15 Q . . . .
7.87 0.0783 0.15 Q . . . .
7.99 0.0799 0.15 Q . . . .
8.12 0.0814 0.15 Q . . . .
8.24 0.0830 0.16 Q . . . .
8.36 0.0846 0.16 Q . . . .
8.49 0.0862 0.16 Q . . . .
8.61 0.0879 0.16 Q . . . .
8.73 0.0895 0.16 Q . . . .
8.86 0.0912 0.16 Q . . . .
8.98 0.0929 0.17 Q . . . .
9.10 0.0946 0.17 Q . . . .
9.23 0.0963 0.17 Q . . . .
9.35 0.0980 0.17 Q . . . .
9.47 0.0998 0.17 Q . . . .
9.60 0.1015 0.18 Q . . . .
9.72 0.1033 0.18 Q . . . .
9.84 0.1052 0.18 Q . . . .
9.96 0.1070 0.18 Q . . . .
10.09 0.1089 0.18 Q . . . .
10.21 0.1108 0.19 Q . . . .
10.33 0.1127 0.19 Q . . . .
10.46 0.1146 0.19 Q . . . .
10.58 0.1166 0.19 Q . . . .
10.70 0.1186 0.20 Q . . . .
10.83 0.1206 0.20 Q . . . .
10.95 0.1227 0.20 Q . . . .
11.07 0.1248 0.21 Q . . . .
11.20 0.1269 0.21 Q . . . .
11.32 0.1290 0.21 Q . . . .
11.44 0.1312 0.22 Q . . . .
11.57 0.1335 0.22 Q . . . .
11.69 0.1357 0.22 Q . . . .
11.81 0.1380 0.23 Q . . . .
11.94 0.1404 0.23 Q . . . .
12.06 0.1428 0.24 Q . . . .
12.18 0.1455 0.29 .Q . . . .
12.30 0.1485 0.30 .Q . . . .
12.43 0.1515 0.30 .Q . . . .
12.55 0.1546 0.31 .Q . . . .
Item: 11
1415
12.67 0.1578 0.32 .Q . . . .
12.80 0.1611 0.32 .Q . . . .
12.92 0.1644 0.33 .Q . . . .
13.04 0.1677 0.33 .Q . . . .
13.17 0.1712 0.34 .Q . . . .
13.29 0.1747 0.35 .Q . . . .
13.41 0.1783 0.36 .Q . . . .
13.54 0.1821 0.37 .Q . . . .
13.66 0.1859 0.38 .Q . . . .
13.78 0.1898 0.39 .Q . . . .
13.91 0.1938 0.40 .Q . . . .
14.03 0.1980 0.41 .Q . . . .
14.15 0.2023 0.45 .Q . . . .
14.28 0.2069 0.46 .Q . . . .
14.40 0.2117 0.48 .Q . . . .
14.52 0.2167 0.49 .Q . . . .
14.65 0.2218 0.52 . Q . . . .
14.77 0.2272 0.54 . Q . . . .
14.89 0.2329 0.58 . Q . . . .
15.01 0.2389 0.60 . Q . . . .
15.14 0.2453 0.65 . Q . . . .
15.26 0.2521 0.68 . Q . . . .
15.38 0.2594 0.75 . Q . . . .
15.51 0.2668 0.71 . Q . . . .
15.63 0.2747 0.85 . Q . . . .
15.75 0.2839 0.96 . Q . . . .
15.88 0.2959 1.39 . Q . . . .
16.00 0.3126 1.90 . Q . . . .
16.12 0.3512 5.68 . . . Q . .
16.25 0.3859 1.14 . Q . . . .
16.37 0.3956 0.77 . Q . . . .
16.49 0.4032 0.72 . Q . . . .
16.62 0.4101 0.62 . Q . . . .
16.74 0.4161 0.56 . Q . . . .
16.86 0.4215 0.51 . Q . . . .
16.99 0.4265 0.47 .Q . . . .
17.11 0.4310 0.43 .Q . . . .
17.23 0.4352 0.40 .Q . . . .
17.35 0.4391 0.37 .Q . . . .
17.48 0.4428 0.36 .Q . . . .
17.60 0.4464 0.34 .Q . . . .
17.72 0.4497 0.32 .Q . . . .
17.85 0.4530 0.31 .Q . . . .
17.97 0.4561 0.30 .Q . . . .
18.09 0.4590 0.28 .Q . . . .
18.22 0.4616 0.23 Q . . . .
18.34 0.4639 0.22 Q . . . .
18.46 0.4661 0.21 Q . . . .
18.59 0.4683 0.21 Q . . . .
18.71 0.4704 0.20 Q . . . .
Item: 11
1416
18.83 0.4724 0.20 Q . . . .
18.96 0.4744 0.19 Q . . . .
19.08 0.4763 0.19 Q . . . .
19.20 0.4782 0.18 Q . . . .
19.33 0.4800 0.18 Q . . . .
19.45 0.4818 0.17 Q . . . .
19.57 0.4835 0.17 Q . . . .
19.69 0.4852 0.17 Q . . . .
19.82 0.4869 0.16 Q . . . .
19.94 0.4885 0.16 Q . . . .
20.06 0.4901 0.16 Q . . . .
20.19 0.4917 0.15 Q . . . .
20.31 0.4932 0.15 Q . . . .
20.43 0.4947 0.15 Q . . . .
20.56 0.4962 0.14 Q . . . .
20.68 0.4977 0.14 Q . . . .
20.80 0.4991 0.14 Q . . . .
20.93 0.5005 0.14 Q . . . .
21.05 0.5019 0.14 Q . . . .
21.17 0.5033 0.13 Q . . . .
21.30 0.5046 0.13 Q . . . .
21.42 0.5059 0.13 Q . . . .
21.54 0.5072 0.13 Q . . . .
21.67 0.5085 0.13 Q . . . .
21.79 0.5098 0.12 Q . . . .
21.91 0.5110 0.12 Q . . . .
22.04 0.5123 0.12 Q . . . .
22.16 0.5135 0.12 Q . . . .
22.28 0.5147 0.12 Q . . . .
22.40 0.5159 0.12 Q . . . .
22.53 0.5171 0.11 Q . . . .
22.65 0.5182 0.11 Q . . . .
22.77 0.5194 0.11 Q . . . .
22.90 0.5205 0.11 Q . . . .
23.02 0.5216 0.11 Q . . . .
23.14 0.5228 0.11 Q . . . .
23.27 0.5239 0.11 Q . . . .
23.39 0.5249 0.11 Q . . . .
23.51 0.5260 0.11 Q . . . .
23.64 0.5271 0.10 Q . . . .
23.76 0.5281 0.10 Q . . . .
23.88 0.5292 0.10 Q . . . .
24.01 0.5302 0.10 Q . . . .
24.13 0.5307 0.00 Q . . . .
---------------------------------------------------------------------------- -------------------------------------------------------------------------------- TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Item: 11
1417
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1441.0
10% 110.8
20% 29.6
30% 14.8
40% 7.4
50% 7.4
60% 7.4
70% 7.4
80% 7.4
90% 7.4
Item: 11
1418
____________________________________________________________________________ ****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================ (C) Copyright 1989-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
**************************************************************************** ---------------------------------------------------------------------------- Problem Descriptions:
COSTCO FOOTHILL RANCH
EXISTING DA D 2 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------------------- RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 4.02
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.131
TIME OF CONCENTRATION(MIN.) = 18.01
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 2
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19
30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40
1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53
3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89
6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22
24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.61
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.07
**************************************************************************** TIME VOLUME Q 0. 2.5 5.0 7.5 10.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.09 0.0000 0.00 Q . . . .
0.39 0.0014 0.12 Q . . . .
Item: 11
1419
0.69 0.0043 0.12 Q . . . .
0.99 0.0073 0.12 Q . . . .
1.29 0.0103 0.12 Q . . . .
1.59 0.0133 0.12 Q . . . .
1.89 0.0163 0.12 Q . . . .
2.19 0.0194 0.13 Q . . . .
2.49 0.0225 0.13 Q . . . .
2.79 0.0257 0.13 Q . . . .
3.09 0.0289 0.13 Q . . . .
3.39 0.0322 0.13 Q . . . .
3.69 0.0355 0.13 Q . . . .
3.99 0.0389 0.14 Q . . . .
4.29 0.0423 0.14 Q . . . .
4.59 0.0458 0.14 Q . . . .
4.89 0.0493 0.14 Q . . . .
5.19 0.0529 0.15 Q . . . .
5.49 0.0565 0.15 Q . . . .
5.79 0.0603 0.15 Q . . . .
6.09 0.0640 0.15 Q . . . .
6.39 0.0679 0.16 Q . . . .
6.69 0.0718 0.16 Q . . . .
6.99 0.0758 0.16 Q . . . .
7.30 0.0799 0.17 Q . . . .
7.60 0.0841 0.17 Q . . . .
7.90 0.0883 0.17 Q . . . .
8.20 0.0927 0.18 Q . . . .
8.50 0.0972 0.18 Q . . . .
8.80 0.1017 0.19 Q . . . .
9.10 0.1064 0.19 Q . . . .
9.40 0.1112 0.20 Q . . . .
9.70 0.1162 0.20 Q . . . .
10.00 0.1213 0.21 Q . . . .
10.30 0.1265 0.22 Q . . . .
10.60 0.1319 0.22 Q . . . .
10.90 0.1375 0.23 Q . . . .
11.20 0.1433 0.24 Q . . . .
11.50 0.1493 0.25 Q . . . .
11.80 0.1556 0.26 .Q . . . .
12.10 0.1621 0.27 .Q . . . .
12.40 0.1697 0.34 .Q . . . .
12.70 0.1784 0.36 .Q . . . .
13.00 0.1874 0.37 .Q . . . .
13.30 0.1970 0.40 .Q . . . .
13.60 0.2071 0.41 .Q . . . .
13.90 0.2178 0.45 .Q . . . .
14.20 0.2294 0.48 .Q . . . .
14.50 0.2421 0.55 . Q . . . .
14.80 0.2563 0.59 . Q . . . .
15.10 0.2722 0.70 . Q . . . .
15.40 0.2904 0.77 . Q . . . .
Item: 11
1420
15.70 0.3115 0.93 . Q . . . .
16.00 0.3391 1.29 . Q . . . .
16.30 0.4035 3.90 . . Q . . .
16.60 0.4623 0.84 . Q . . . .
16.90 0.4806 0.64 . Q . . . .
17.20 0.4950 0.52 . Q . . . .
17.50 0.5068 0.43 .Q . . . .
17.80 0.5169 0.38 .Q . . . .
18.10 0.5260 0.35 .Q . . . .
18.40 0.5336 0.26 .Q . . . .
18.70 0.5399 0.24 Q . . . .
19.00 0.5457 0.23 Q . . . .
19.30 0.5511 0.21 Q . . . .
19.60 0.5562 0.20 Q . . . .
19.90 0.5610 0.19 Q . . . .
20.20 0.5656 0.18 Q . . . .
20.50 0.5700 0.17 Q . . . .
20.80 0.5742 0.16 Q . . . .
21.10 0.5782 0.16 Q . . . .
21.40 0.5820 0.15 Q . . . .
21.70 0.5857 0.15 Q . . . .
22.00 0.5893 0.14 Q . . . .
22.30 0.5928 0.14 Q . . . .
22.60 0.5962 0.13 Q . . . .
22.90 0.5994 0.13 Q . . . .
23.20 0.6026 0.13 Q . . . .
23.50 0.6057 0.12 Q . . . .
23.80 0.6087 0.12 Q . . . .
24.10 0.6116 0.12 Q . . . .
24.40 0.6131 0.00 Q . . . .
---------------------------------------------------------------------------- -------------------------------------------------------------------------------- TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1440.8
10% 270.1
20% 72.0
30% 36.0
40% 18.0
50% 18.0
60% 18.0
70% 18.0
80% 18.0
90% 18.0
Item: 11
1421
____________________________________________________________________________ ****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================ (C) Copyright 1989-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
**************************************************************************** ---------------------------------------------------------------------------- Problem Descriptions:
COSTCO FOOTHILL RANCH
EXISTING DA A 100 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------------------- RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 1.45
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.131
TIME OF CONCENTRATION(MIN.) = 6.40
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 100
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.52
30-MINUTE POINT RAINFALL VALUE(INCHES) = 1.09
1-HOUR POINT RAINFALL VALUE(INCHES) = 1.45
3-HOUR POINT RAINFALL VALUE(INCHES) = 2.43
6-HOUR POINT RAINFALL VALUE(INCHES) = 3.36
24-HOUR POINT RAINFALL VALUE(INCHES) = 5.63
---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.61
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.07
**************************************************************************** TIME VOLUME Q 0. 2.5 5.0 7.5 10.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.11 0.0005 0.11 Q . . . .
0.21 0.0015 0.11 Q . . . .
Item: 11
1422
0.32 0.0025 0.12 Q . . . .
0.43 0.0035 0.12 Q . . . .
0.53 0.0046 0.12 Q . . . .
0.64 0.0056 0.12 Q . . . .
0.75 0.0066 0.12 Q . . . .
0.85 0.0076 0.12 Q . . . .
0.96 0.0087 0.12 Q . . . .
1.07 0.0097 0.12 Q . . . .
1.17 0.0108 0.12 Q . . . .
1.28 0.0118 0.12 Q . . . .
1.39 0.0129 0.12 Q . . . .
1.49 0.0139 0.12 Q . . . .
1.60 0.0150 0.12 Q . . . .
1.71 0.0161 0.12 Q . . . .
1.81 0.0172 0.12 Q . . . .
1.92 0.0182 0.12 Q . . . .
2.03 0.0193 0.12 Q . . . .
2.13 0.0204 0.12 Q . . . .
2.24 0.0215 0.12 Q . . . .
2.35 0.0226 0.13 Q . . . .
2.45 0.0237 0.13 Q . . . .
2.56 0.0248 0.13 Q . . . .
2.67 0.0260 0.13 Q . . . .
2.77 0.0271 0.13 Q . . . .
2.88 0.0282 0.13 Q . . . .
2.99 0.0294 0.13 Q . . . .
3.09 0.0305 0.13 Q . . . .
3.20 0.0316 0.13 Q . . . .
3.31 0.0328 0.13 Q . . . .
3.41 0.0340 0.13 Q . . . .
3.52 0.0351 0.13 Q . . . .
3.63 0.0363 0.13 Q . . . .
3.73 0.0375 0.13 Q . . . .
3.84 0.0387 0.13 Q . . . .
3.95 0.0399 0.14 Q . . . .
4.05 0.0411 0.14 Q . . . .
4.16 0.0423 0.14 Q . . . .
4.27 0.0435 0.14 Q . . . .
4.37 0.0447 0.14 Q . . . .
4.48 0.0459 0.14 Q . . . .
4.59 0.0471 0.14 Q . . . .
4.69 0.0484 0.14 Q . . . .
4.80 0.0496 0.14 Q . . . .
4.91 0.0509 0.14 Q . . . .
5.01 0.0522 0.14 Q . . . .
5.12 0.0534 0.14 Q . . . .
5.23 0.0547 0.15 Q . . . .
5.33 0.0560 0.15 Q . . . .
5.44 0.0573 0.15 Q . . . .
5.55 0.0586 0.15 Q . . . .
Item: 11
1423
5.65 0.0599 0.15 Q . . . .
5.76 0.0612 0.15 Q . . . .
5.87 0.0625 0.15 Q . . . .
5.97 0.0639 0.15 Q . . . .
6.08 0.0652 0.15 Q . . . .
6.19 0.0666 0.15 Q . . . .
6.29 0.0679 0.16 Q . . . .
6.40 0.0693 0.16 Q . . . .
6.51 0.0707 0.16 Q . . . .
6.61 0.0721 0.16 Q . . . .
6.72 0.0735 0.16 Q . . . .
6.83 0.0749 0.16 Q . . . .
6.93 0.0763 0.16 Q . . . .
7.04 0.0777 0.16 Q . . . .
7.15 0.0792 0.16 Q . . . .
7.25 0.0806 0.17 Q . . . .
7.36 0.0821 0.17 Q . . . .
7.47 0.0836 0.17 Q . . . .
7.57 0.0851 0.17 Q . . . .
7.68 0.0866 0.17 Q . . . .
7.79 0.0881 0.17 Q . . . .
7.89 0.0896 0.17 Q . . . .
8.00 0.0911 0.18 Q . . . .
8.11 0.0927 0.18 Q . . . .
8.21 0.0942 0.18 Q . . . .
8.32 0.0958 0.18 Q . . . .
8.43 0.0974 0.18 Q . . . .
8.53 0.0990 0.18 Q . . . .
8.64 0.1006 0.18 Q . . . .
8.75 0.1023 0.19 Q . . . .
8.85 0.1039 0.19 Q . . . .
8.96 0.1056 0.19 Q . . . .
9.07 0.1072 0.19 Q . . . .
9.17 0.1089 0.19 Q . . . .
9.28 0.1106 0.20 Q . . . .
9.39 0.1124 0.20 Q . . . .
9.49 0.1141 0.20 Q . . . .
9.60 0.1159 0.20 Q . . . .
9.71 0.1176 0.20 Q . . . .
9.81 0.1194 0.20 Q . . . .
9.92 0.1213 0.21 Q . . . .
10.03 0.1231 0.21 Q . . . .
10.13 0.1250 0.21 Q . . . .
10.24 0.1268 0.21 Q . . . .
10.35 0.1287 0.22 Q . . . .
10.45 0.1307 0.22 Q . . . .
10.56 0.1326 0.22 Q . . . .
10.67 0.1346 0.22 Q . . . .
10.77 0.1366 0.23 Q . . . .
10.88 0.1386 0.23 Q . . . .
Item: 11
1424
10.99 0.1406 0.23 Q . . . .
11.09 0.1427 0.24 Q . . . .
11.20 0.1448 0.24 Q . . . .
11.31 0.1469 0.24 Q . . . .
11.41 0.1491 0.25 Q . . . .
11.52 0.1513 0.25 Q . . . .
11.63 0.1535 0.25 .Q . . . .
11.73 0.1558 0.26 .Q . . . .
11.84 0.1581 0.26 .Q . . . .
11.95 0.1604 0.27 .Q . . . .
12.05 0.1628 0.29 .Q . . . .
12.16 0.1656 0.34 .Q . . . .
12.27 0.1687 0.35 .Q . . . .
12.37 0.1718 0.35 .Q . . . .
12.48 0.1750 0.36 .Q . . . .
12.59 0.1782 0.37 .Q . . . .
12.69 0.1814 0.37 .Q . . . .
12.80 0.1847 0.38 .Q . . . .
12.91 0.1881 0.39 .Q . . . .
13.01 0.1915 0.39 .Q . . . .
13.12 0.1950 0.40 .Q . . . .
13.23 0.1986 0.41 .Q . . . .
13.33 0.2022 0.42 .Q . . . .
13.44 0.2060 0.42 .Q . . . .
13.55 0.2097 0.44 .Q . . . .
13.65 0.2136 0.44 .Q . . . .
13.76 0.2176 0.46 .Q . . . .
13.87 0.2217 0.47 .Q . . . .
13.97 0.2258 0.48 .Q . . . .
14.08 0.2301 0.49 .Q . . . .
14.19 0.2345 0.51 . Q . . . .
14.29 0.2391 0.52 . Q . . . .
14.40 0.2438 0.55 . Q . . . .
14.51 0.2487 0.56 . Q . . . .
14.61 0.2538 0.59 . Q . . . .
14.72 0.2590 0.60 . Q . . . .
14.83 0.2645 0.64 . Q . . . .
14.93 0.2702 0.66 . Q . . . .
15.04 0.2762 0.71 . Q . . . .
15.15 0.2826 0.73 . Q . . . .
15.25 0.2893 0.80 . Q . . . .
15.36 0.2965 0.84 . Q . . . .
15.47 0.3039 0.83 . Q . . . .
15.57 0.3114 0.89 . Q . . . .
15.68 0.3200 1.07 . Q . . . .
15.79 0.3301 1.20 . Q . . . .
15.89 0.3429 1.71 . Q . . . .
16.00 0.3607 2.34 . Q. . . .
16.11 0.4021 7.04 . . . Q . .
16.21 0.4393 1.40 . Q . . . .
Item: 11
1425
16.32 0.4497 0.97 . Q . . . .
16.43 0.4577 0.84 . Q . . . .
16.53 0.4648 0.76 . Q . . . .
16.64 0.4712 0.68 . Q . . . .
16.75 0.4769 0.62 . Q . . . .
16.85 0.4821 0.57 . Q . . . .
16.96 0.4870 0.53 . Q . . . .
17.07 0.4916 0.50 . Q . . . .
17.17 0.4959 0.47 .Q . . . .
17.28 0.5000 0.45 .Q . . . .
17.39 0.5039 0.43 .Q . . . .
17.49 0.5076 0.41 .Q . . . .
17.60 0.5111 0.40 .Q . . . .
17.71 0.5146 0.38 .Q . . . .
17.81 0.5179 0.37 .Q . . . .
17.92 0.5211 0.36 .Q . . . .
18.03 0.5242 0.35 .Q . . . .
18.13 0.5269 0.27 .Q . . . .
18.24 0.5292 0.26 .Q . . . .
18.35 0.5315 0.25 .Q . . . .
18.45 0.5337 0.24 Q . . . .
18.56 0.5358 0.24 Q . . . .
18.67 0.5379 0.23 Q . . . .
18.77 0.5399 0.23 Q . . . .
18.88 0.5419 0.22 Q . . . .
18.99 0.5438 0.22 Q . . . .
19.09 0.5457 0.21 Q . . . .
19.20 0.5475 0.21 Q . . . .
19.31 0.5493 0.20 Q . . . .
19.41 0.5511 0.20 Q . . . .
19.52 0.5528 0.19 Q . . . .
19.63 0.5545 0.19 Q . . . .
19.73 0.5562 0.19 Q . . . .
19.84 0.5578 0.18 Q . . . .
19.95 0.5594 0.18 Q . . . .
20.05 0.5610 0.18 Q . . . .
20.16 0.5625 0.17 Q . . . .
20.27 0.5640 0.17 Q . . . .
20.37 0.5655 0.17 Q . . . .
20.48 0.5670 0.17 Q . . . .
20.59 0.5685 0.16 Q . . . .
20.69 0.5699 0.16 Q . . . .
20.80 0.5713 0.16 Q . . . .
20.91 0.5727 0.16 Q . . . .
21.01 0.5741 0.15 Q . . . .
21.12 0.5754 0.15 Q . . . .
21.23 0.5768 0.15 Q . . . .
21.33 0.5781 0.15 Q . . . .
21.44 0.5794 0.15 Q . . . .
21.55 0.5807 0.14 Q . . . .
Item: 11
1426
21.65 0.5819 0.14 Q . . . .
21.76 0.5832 0.14 Q . . . .
21.87 0.5844 0.14 Q . . . .
21.97 0.5857 0.14 Q . . . .
22.08 0.5869 0.14 Q . . . .
22.19 0.5881 0.14 Q . . . .
22.29 0.5893 0.13 Q . . . .
22.40 0.5904 0.13 Q . . . .
22.51 0.5916 0.13 Q . . . .
22.61 0.5927 0.13 Q . . . .
22.72 0.5939 0.13 Q . . . .
22.83 0.5950 0.13 Q . . . .
22.93 0.5961 0.13 Q . . . .
23.04 0.5972 0.12 Q . . . .
23.15 0.5983 0.12 Q . . . .
23.25 0.5994 0.12 Q . . . .
23.36 0.6005 0.12 Q . . . .
23.47 0.6015 0.12 Q . . . .
23.57 0.6026 0.12 Q . . . .
23.68 0.6036 0.12 Q . . . .
23.79 0.6047 0.12 Q . . . .
23.89 0.6057 0.12 Q . . . .
24.00 0.6067 0.11 Q . . . .
24.11 0.6072 0.00 Q . . . .
---------------------------------------------------------------------------- -------------------------------------------------------------------------------- TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1440.0
10% 96.0
20% 19.2
30% 12.8
40% 6.4
50% 6.4
60% 6.4
70% 6.4
80% 6.4
90% 6.4
Item: 11
1427
____________________________________________________________________________ ****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================ (C) Copyright 1989-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
**************************************************************************** ---------------------------------------------------------------------------- Problem Descriptions:
COSTCO FOOTHILL RANCH
EXISTING DA B 100 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------------------- RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 6.28
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.131
TIME OF CONCENTRATION(MIN.) = 8.82
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 100
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.52
30-MINUTE POINT RAINFALL VALUE(INCHES) = 1.09
1-HOUR POINT RAINFALL VALUE(INCHES) = 1.45
3-HOUR POINT RAINFALL VALUE(INCHES) = 2.43
6-HOUR POINT RAINFALL VALUE(INCHES) = 3.36
24-HOUR POINT RAINFALL VALUE(INCHES) = 5.63
---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 2.63
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.31
**************************************************************************** TIME VOLUME Q 0. 7.5 15.0 22.5 30.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.12 0.0030 0.49 Q . . . .
0.27 0.0090 0.50 Q . . . .
Item: 11
1428
0.42 0.0151 0.50 Q . . . .
0.57 0.0212 0.50 Q . . . .
0.71 0.0273 0.50 Q . . . .
0.86 0.0334 0.51 Q . . . .
1.01 0.0396 0.51 Q . . . .
1.15 0.0459 0.52 Q . . . .
1.30 0.0521 0.52 Q . . . .
1.45 0.0585 0.52 Q . . . .
1.59 0.0648 0.52 Q . . . .
1.74 0.0712 0.53 Q . . . .
1.89 0.0776 0.53 Q . . . .
2.04 0.0841 0.54 Q . . . .
2.18 0.0906 0.54 Q . . . .
2.33 0.0972 0.54 Q . . . .
2.48 0.1038 0.54 Q . . . .
2.62 0.1104 0.55 Q . . . .
2.77 0.1171 0.55 Q . . . .
2.92 0.1239 0.56 Q . . . .
3.06 0.1307 0.56 Q . . . .
3.21 0.1375 0.57 Q . . . .
3.36 0.1444 0.57 Q . . . .
3.51 0.1513 0.57 Q . . . .
3.65 0.1583 0.58 Q . . . .
3.80 0.1654 0.58 Q . . . .
3.95 0.1724 0.59 Q . . . .
4.09 0.1796 0.59 Q . . . .
4.24 0.1868 0.59 Q . . . .
4.39 0.1940 0.60 Q . . . .
4.53 0.2014 0.60 Q . . . .
4.68 0.2087 0.61 Q . . . .
4.83 0.2162 0.61 Q . . . .
4.98 0.2237 0.62 Q . . . .
5.12 0.2312 0.62 Q . . . .
5.27 0.2388 0.63 Q . . . .
5.42 0.2465 0.63 Q . . . .
5.56 0.2543 0.64 Q . . . .
5.71 0.2621 0.65 Q . . . .
5.86 0.2700 0.65 Q . . . .
6.00 0.2779 0.66 Q . . . .
6.15 0.2860 0.67 Q . . . .
6.30 0.2941 0.67 Q . . . .
6.45 0.3023 0.68 Q . . . .
6.59 0.3105 0.68 Q . . . .
6.74 0.3189 0.69 Q . . . .
6.89 0.3273 0.70 Q . . . .
7.03 0.3358 0.71 Q . . . .
7.18 0.3444 0.71 Q . . . .
7.33 0.3531 0.72 Q . . . .
7.47 0.3619 0.73 Q . . . .
7.62 0.3707 0.74 Q . . . .
Item: 11
1429
7.77 0.3797 0.74 Q . . . .
7.92 0.3888 0.75 .Q . . . .
8.06 0.3979 0.76 .Q . . . .
8.21 0.4072 0.77 .Q . . . .
8.36 0.4166 0.78 .Q . . . .
8.50 0.4261 0.79 .Q . . . .
8.65 0.4357 0.79 .Q . . . .
8.80 0.4455 0.81 .Q . . . .
8.94 0.4553 0.81 .Q . . . .
9.09 0.4653 0.83 .Q . . . .
9.24 0.4754 0.84 .Q . . . .
9.39 0.4857 0.85 .Q . . . .
9.53 0.4961 0.86 .Q . . . .
9.68 0.5066 0.88 .Q . . . .
9.83 0.5173 0.88 .Q . . . .
9.97 0.5281 0.90 .Q . . . .
10.12 0.5391 0.91 .Q . . . .
10.27 0.5503 0.93 .Q . . . .
10.41 0.5617 0.94 .Q . . . .
10.56 0.5732 0.96 .Q . . . .
10.71 0.5850 0.97 .Q . . . .
10.85 0.5969 0.99 .Q . . . .
11.00 0.6091 1.01 .Q . . . .
11.15 0.6215 1.03 .Q . . . .
11.30 0.6341 1.04 .Q . . . .
11.44 0.6469 1.07 .Q . . . .
11.59 0.6600 1.09 .Q . . . .
11.74 0.6734 1.12 .Q . . . .
11.88 0.6871 1.13 .Q . . . .
12.03 0.7010 1.17 .Q . . . .
12.18 0.7168 1.43 .Q . . . .
12.32 0.7348 1.53 . Q . . . .
12.47 0.7534 1.55 . Q . . . .
12.62 0.7725 1.59 . Q . . . .
12.77 0.7920 1.62 . Q . . . .
12.91 0.8120 1.67 . Q . . . .
13.06 0.8325 1.70 . Q . . . .
13.21 0.8535 1.76 . Q . . . .
13.35 0.8750 1.79 . Q . . . .
13.50 0.8972 1.86 . Q . . . .
13.65 0.9201 1.90 . Q . . . .
13.80 0.9437 1.99 . Q . . . .
13.94 0.9681 2.03 . Q . . . .
14.09 0.9935 2.14 . Q . . . .
14.24 1.0198 2.20 . Q . . . .
14.38 1.0474 2.33 . Q . . . .
14.53 1.0762 2.41 . Q . . . .
14.68 1.1065 2.58 . Q . . . .
14.82 1.1385 2.68 . Q . . . .
14.97 1.1725 2.92 . Q . . . .
Item: 11
1430
15.12 1.2088 3.06 . Q . . . .
15.27 1.2482 3.42 . Q . . . .
15.41 1.2912 3.66 . Q . . . .
15.56 1.3367 3.83 . Q . . . .
15.71 1.3861 4.31 . Q . . . .
15.85 1.4496 6.14 . Q . . . .
16.00 1.5378 8.38 . .Q . . .
16.15 1.7422 25.28 . . . . Q .
16.29 1.9262 5.01 . Q . . . .
16.44 1.9783 3.56 . Q . . . .
16.59 2.0195 3.23 . Q . . . .
16.73 2.0561 2.79 . Q . . . .
16.88 2.0881 2.49 . Q . . . .
17.03 2.1170 2.27 . Q . . . .
17.18 2.1434 2.08 . Q . . . .
17.32 2.1679 1.94 . Q . . . .
17.47 2.1908 1.83 . Q . . . .
17.62 2.2124 1.73 . Q . . . .
17.76 2.2328 1.64 . Q . . . .
17.91 2.2524 1.57 . Q . . . .
18.06 2.2711 1.51 . Q . . . .
18.20 2.2872 1.15 .Q . . . .
18.35 2.3009 1.10 .Q . . . .
18.50 2.3140 1.06 .Q . . . .
18.65 2.3266 1.02 .Q . . . .
18.79 2.3387 0.98 .Q . . . .
18.94 2.3505 0.95 .Q . . . .
19.09 2.3618 0.92 .Q . . . .
19.23 2.3729 0.89 .Q . . . .
19.38 2.3836 0.87 .Q . . . .
19.53 2.3939 0.84 .Q . . . .
19.67 2.4041 0.82 .Q . . . .
19.82 2.4139 0.80 .Q . . . .
19.97 2.4235 0.78 .Q . . . .
20.12 2.4329 0.76 .Q . . . .
20.26 2.4421 0.75 Q . . . .
20.41 2.4511 0.73 Q . . . .
20.56 2.4598 0.71 Q . . . .
20.70 2.4684 0.70 Q . . . .
20.85 2.4769 0.69 Q . . . .
21.00 2.4851 0.67 Q . . . .
21.14 2.4932 0.66 Q . . . .
21.29 2.5012 0.65 Q . . . .
21.44 2.5090 0.64 Q . . . .
21.59 2.5167 0.63 Q . . . .
21.73 2.5243 0.62 Q . . . .
21.88 2.5317 0.61 Q . . . .
22.03 2.5390 0.60 Q . . . .
22.17 2.5462 0.59 Q . . . .
22.32 2.5533 0.58 Q . . . .
Item: 11
1431
22.47 2.5603 0.57 Q . . . .
22.61 2.5672 0.56 Q . . . .
22.76 2.5740 0.55 Q . . . .
22.91 2.5807 0.55 Q . . . .
23.06 2.5873 0.54 Q . . . .
23.20 2.5938 0.53 Q . . . .
23.35 2.6002 0.53 Q . . . .
23.50 2.6066 0.52 Q . . . .
23.64 2.6128 0.51 Q . . . .
23.79 2.6190 0.51 Q . . . .
23.94 2.6252 0.50 Q . . . .
24.08 2.6312 0.50 Q . . . .
24.23 2.6342 0.00 Q . . . .
---------------------------------------------------------------------------- -------------------------------------------------------------------------------- TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1446.5
10% 132.3
20% 26.5
30% 17.6
40% 8.8
50% 8.8
60% 8.8
70% 8.8
80% 8.8
90% 8.8
Item: 11
1432
____________________________________________________________________________ ****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================ (C) Copyright 1989-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
**************************************************************************** ---------------------------------------------------------------------------- Problem Descriptions:
COSTCO FOOTHILL RANCH
EXISTING DA C 100 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------------------- RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 3.48
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.131
TIME OF CONCENTRATION(MIN.) = 7.39
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 100
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.52
30-MINUTE POINT RAINFALL VALUE(INCHES) = 1.09
1-HOUR POINT RAINFALL VALUE(INCHES) = 1.45
3-HOUR POINT RAINFALL VALUE(INCHES) = 2.43
6-HOUR POINT RAINFALL VALUE(INCHES) = 3.36
24-HOUR POINT RAINFALL VALUE(INCHES) = 5.63
---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 1.46
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.18
**************************************************************************** TIME VOLUME Q 0. 5.0 10.0 15.0 20.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.11 0.0013 0.27 Q . . . .
0.23 0.0041 0.27 Q . . . .
Item: 11
1433
0.36 0.0069 0.28 Q . . . .
0.48 0.0097 0.28 Q . . . .
0.60 0.0125 0.28 Q . . . .
0.73 0.0154 0.28 Q . . . .
0.85 0.0182 0.28 Q . . . .
0.97 0.0211 0.28 Q . . . .
1.10 0.0240 0.29 Q . . . .
1.22 0.0269 0.29 Q . . . .
1.34 0.0298 0.29 Q . . . .
1.47 0.0328 0.29 Q . . . .
1.59 0.0357 0.29 Q . . . .
1.71 0.0387 0.29 Q . . . .
1.84 0.0417 0.29 Q . . . .
1.96 0.0447 0.30 Q . . . .
2.08 0.0477 0.30 Q . . . .
2.21 0.0507 0.30 Q . . . .
2.33 0.0538 0.30 Q . . . .
2.45 0.0568 0.30 Q . . . .
2.57 0.0599 0.30 Q . . . .
2.70 0.0630 0.31 Q . . . .
2.82 0.0661 0.31 Q . . . .
2.94 0.0693 0.31 Q . . . .
3.07 0.0724 0.31 Q . . . .
3.19 0.0756 0.31 Q . . . .
3.31 0.0788 0.32 Q . . . .
3.44 0.0820 0.32 Q . . . .
3.56 0.0853 0.32 Q . . . .
3.68 0.0885 0.32 Q . . . .
3.81 0.0918 0.32 Q . . . .
3.93 0.0951 0.32 Q . . . .
4.05 0.0984 0.33 Q . . . .
4.18 0.1017 0.33 Q . . . .
4.30 0.1051 0.33 Q . . . .
4.42 0.1085 0.33 Q . . . .
4.55 0.1119 0.34 Q . . . .
4.67 0.1153 0.34 Q . . . .
4.79 0.1188 0.34 Q . . . .
4.92 0.1222 0.34 Q . . . .
5.04 0.1257 0.35 Q . . . .
5.16 0.1293 0.35 Q . . . .
5.28 0.1328 0.35 Q . . . .
5.41 0.1364 0.35 Q . . . .
5.53 0.1400 0.36 Q . . . .
5.65 0.1436 0.36 Q . . . .
5.78 0.1473 0.36 Q . . . .
5.90 0.1509 0.36 Q . . . .
6.02 0.1546 0.37 Q . . . .
6.15 0.1584 0.37 Q . . . .
6.27 0.1621 0.37 Q . . . .
6.39 0.1659 0.37 Q . . . .
Item: 11
1434
6.52 0.1698 0.38 Q . . . .
6.64 0.1736 0.38 Q . . . .
6.76 0.1775 0.38 Q . . . .
6.89 0.1814 0.39 Q . . . .
7.01 0.1854 0.39 Q . . . .
7.13 0.1894 0.39 Q . . . .
7.26 0.1934 0.40 Q . . . .
7.38 0.1974 0.40 Q . . . .
7.50 0.2015 0.40 Q . . . .
7.62 0.2057 0.41 Q . . . .
7.75 0.2098 0.41 Q . . . .
7.87 0.2140 0.41 Q . . . .
7.99 0.2183 0.42 Q . . . .
8.12 0.2226 0.42 Q . . . .
8.24 0.2269 0.43 Q . . . .
8.36 0.2313 0.43 Q . . . .
8.49 0.2357 0.44 Q . . . .
8.61 0.2401 0.44 Q . . . .
8.73 0.2447 0.45 Q . . . .
8.86 0.2492 0.45 Q . . . .
8.98 0.2538 0.46 Q . . . .
9.10 0.2585 0.46 Q . . . .
9.23 0.2632 0.47 Q . . . .
9.35 0.2679 0.47 Q . . . .
9.47 0.2727 0.48 Q . . . .
9.60 0.2776 0.48 Q . . . .
9.72 0.2825 0.49 Q . . . .
9.84 0.2875 0.49 Q . . . .
9.96 0.2926 0.50 .Q . . . .
10.09 0.2977 0.50 .Q . . . .
10.21 0.3029 0.51 .Q . . . .
10.33 0.3081 0.52 .Q . . . .
10.46 0.3134 0.53 .Q . . . .
10.58 0.3188 0.53 .Q . . . .
10.70 0.3243 0.54 .Q . . . .
10.83 0.3298 0.55 .Q . . . .
10.95 0.3355 0.56 .Q . . . .
11.07 0.3412 0.56 .Q . . . .
11.20 0.3470 0.58 .Q . . . .
11.32 0.3529 0.58 .Q . . . .
11.44 0.3589 0.60 .Q . . . .
11.57 0.3650 0.60 .Q . . . .
11.69 0.3712 0.62 .Q . . . .
11.81 0.3775 0.62 .Q . . . .
11.94 0.3839 0.64 .Q . . . .
12.06 0.3904 0.65 .Q . . . .
12.18 0.3979 0.83 .Q . . . .
12.30 0.4065 0.84 .Q . . . .
12.43 0.4151 0.86 .Q . . . .
12.55 0.4239 0.87 .Q . . . .
Item: 11
1435
12.67 0.4329 0.89 .Q . . . .
12.80 0.4421 0.90 .Q . . . .
12.92 0.4514 0.93 .Q . . . .
13.04 0.4609 0.94 .Q . . . .
13.17 0.4707 0.97 .Q . . . .
13.29 0.4806 0.99 .Q . . . .
13.41 0.4908 1.02 . Q . . . .
13.54 0.5012 1.03 . Q . . . .
13.66 0.5120 1.07 . Q . . . .
13.78 0.5230 1.09 . Q . . . .
13.91 0.5343 1.13 . Q . . . .
14.03 0.5459 1.16 . Q . . . .
14.15 0.5580 1.22 . Q . . . .
14.28 0.5705 1.24 . Q . . . .
14.40 0.5835 1.31 . Q . . . .
14.52 0.5970 1.34 . Q . . . .
14.65 0.6111 1.42 . Q . . . .
14.77 0.6257 1.47 . Q . . . .
14.89 0.6412 1.57 . Q . . . .
15.01 0.6575 1.63 . Q . . . .
15.14 0.6748 1.78 . Q . . . .
15.26 0.6933 1.86 . Q . . . .
15.38 0.7133 2.05 . Q . . . .
15.51 0.7337 1.96 . Q . . . .
15.63 0.7556 2.35 . Q . . . .
15.75 0.7811 2.65 . Q . . . .
15.88 0.8138 3.77 . Q . . . .
16.00 0.8592 5.15 . Q . . .
16.12 0.9645 15.54 . . . .Q .
16.25 1.0593 3.09 . Q . . . .
16.37 1.0859 2.13 . Q . . . .
16.49 1.1068 1.96 . Q . . . .
16.62 1.1254 1.70 . Q . . . .
16.74 1.1417 1.52 . Q . . . .
16.86 1.1565 1.38 . Q . . . .
16.99 1.1700 1.27 . Q . . . .
17.11 1.1825 1.18 . Q . . . .
17.23 1.1942 1.11 . Q . . . .
17.35 1.2052 1.05 . Q . . . .
17.48 1.2157 1.00 . Q . . . .
17.60 1.2256 0.96 .Q . . . .
17.72 1.2351 0.92 .Q . . . .
17.85 1.2443 0.88 .Q . . . .
17.97 1.2531 0.85 .Q . . . .
18.09 1.2614 0.77 .Q . . . .
18.22 1.2685 0.63 .Q . . . .
18.34 1.2748 0.61 .Q . . . .
18.46 1.2809 0.59 .Q . . . .
18.59 1.2868 0.57 .Q . . . .
18.71 1.2925 0.55 .Q . . . .
Item: 11
1436
18.83 1.2981 0.54 .Q . . . .
18.96 1.3035 0.52 .Q . . . .
19.08 1.3087 0.51 .Q . . . .
19.20 1.3139 0.50 Q . . . .
19.33 1.3188 0.48 Q . . . .
19.45 1.3237 0.47 Q . . . .
19.57 1.3285 0.46 Q . . . .
19.69 1.3331 0.45 Q . . . .
19.82 1.3377 0.44 Q . . . .
19.94 1.3421 0.43 Q . . . .
20.06 1.3465 0.43 Q . . . .
20.19 1.3508 0.42 Q . . . .
20.31 1.3550 0.41 Q . . . .
20.43 1.3591 0.40 Q . . . .
20.56 1.3632 0.40 Q . . . .
20.68 1.3672 0.39 Q . . . .
20.80 1.3711 0.38 Q . . . .
20.93 1.3750 0.38 Q . . . .
21.05 1.3788 0.37 Q . . . .
21.17 1.3825 0.36 Q . . . .
21.30 1.3862 0.36 Q . . . .
21.42 1.3898 0.35 Q . . . .
21.54 1.3934 0.35 Q . . . .
21.67 1.3969 0.34 Q . . . .
21.79 1.4004 0.34 Q . . . .
21.91 1.4038 0.33 Q . . . .
22.04 1.4072 0.33 Q . . . .
22.16 1.4105 0.33 Q . . . .
22.28 1.4138 0.32 Q . . . .
22.40 1.4171 0.32 Q . . . .
22.53 1.4203 0.31 Q . . . .
22.65 1.4234 0.31 Q . . . .
22.77 1.4266 0.31 Q . . . .
22.90 1.4297 0.30 Q . . . .
23.02 1.4328 0.30 Q . . . .
23.14 1.4358 0.30 Q . . . .
23.27 1.4388 0.29 Q . . . .
23.39 1.4418 0.29 Q . . . .
23.51 1.4447 0.29 Q . . . .
23.64 1.4476 0.28 Q . . . .
23.76 1.4505 0.28 Q . . . .
23.88 1.4533 0.28 Q . . . .
24.01 1.4561 0.28 Q . . . .
24.13 1.4576 0.00 Q . . . .
---------------------------------------------------------------------------- -------------------------------------------------------------------------------- TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Item: 11
1437
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1441.0
10% 110.8
20% 22.2
30% 14.8
40% 7.4
50% 7.4
60% 7.4
70% 7.4
80% 7.4
90% 7.4
Item: 11
1438
____________________________________________________________________________ ****************************************************************************
SMALL AREA UNIT HYDROGRAPH MODEL
============================================================================ (C) Copyright 1989-2016 Advanced Engineering Software (aes) Ver. 23.0 Release Date: 07/01/2016 License ID 1499
Analysis prepared by:
**************************************************************************** ---------------------------------------------------------------------------- Problem Descriptions:
COSTCO FOOTHILL RANCH
EXISTING DA D 100 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------------------- RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 4.02
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.131
TIME OF CONCENTRATION(MIN.) = 18.01
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 100
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.52
30-MINUTE POINT RAINFALL VALUE(INCHES) = 1.09
1-HOUR POINT RAINFALL VALUE(INCHES) = 1.45
3-HOUR POINT RAINFALL VALUE(INCHES) = 2.43
6-HOUR POINT RAINFALL VALUE(INCHES) = 3.36
24-HOUR POINT RAINFALL VALUE(INCHES) = 5.63
---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 1.68
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.20
**************************************************************************** TIME VOLUME Q 0. 5.0 10.0 15.0 20.0
(HOURS) (AF) (CFS)
----------------------------------------------------------------------------
0.09 0.0000 0.00 Q . . . .
0.39 0.0039 0.32 Q . . . .
Item: 11
1439
0.69 0.0119 0.32 Q . . . .
0.99 0.0199 0.32 Q . . . .
1.29 0.0280 0.33 Q . . . .
1.59 0.0363 0.33 Q . . . .
1.89 0.0446 0.34 Q . . . .
2.19 0.0530 0.34 Q . . . .
2.49 0.0616 0.35 Q . . . .
2.79 0.0703 0.35 Q . . . .
3.09 0.0791 0.36 Q . . . .
3.39 0.0880 0.36 Q . . . .
3.69 0.0971 0.37 Q . . . .
3.99 0.1063 0.37 Q . . . .
4.29 0.1156 0.38 Q . . . .
4.59 0.1251 0.38 Q . . . .
4.89 0.1347 0.39 Q . . . .
5.19 0.1445 0.40 Q . . . .
5.49 0.1545 0.41 Q . . . .
5.79 0.1647 0.41 Q . . . .
6.09 0.1750 0.42 Q . . . .
6.39 0.1855 0.43 Q . . . .
6.69 0.1962 0.44 Q . . . .
6.99 0.2072 0.44 Q . . . .
7.30 0.2184 0.46 Q . . . .
7.60 0.2298 0.46 Q . . . .
7.90 0.2414 0.48 Q . . . .
8.20 0.2533 0.48 Q . . . .
8.50 0.2656 0.50 Q . . . .
8.80 0.2781 0.51 .Q . . . .
9.10 0.2909 0.53 .Q . . . .
9.40 0.3041 0.54 .Q . . . .
9.70 0.3176 0.56 .Q . . . .
10.00 0.3315 0.57 .Q . . . .
10.30 0.3459 0.59 .Q . . . .
10.60 0.3607 0.60 .Q . . . .
10.90 0.3760 0.63 .Q . . . .
11.20 0.3919 0.65 .Q . . . .
11.50 0.4084 0.68 .Q . . . .
11.80 0.4255 0.70 .Q . . . .
12.10 0.4434 0.74 .Q . . . .
12.40 0.4645 0.96 .Q . . . .
12.70 0.4890 1.02 . Q . . . .
13.00 0.5146 1.05 . Q . . . .
13.30 0.5416 1.12 . Q . . . .
13.60 0.5700 1.17 . Q . . . .
13.90 0.6003 1.27 . Q . . . .
14.20 0.6326 1.33 . Q . . . .
14.50 0.6678 1.50 . Q . . . .
14.80 0.7063 1.60 . Q . . . .
15.10 0.7497 1.89 . Q . . . .
15.40 0.7993 2.11 . Q . . . .
Item: 11
1440
15.70 0.8573 2.57 . Q . . . .
16.00 0.9330 3.52 . Q . . . .
16.30 1.1087 10.64 . . .Q . .
16.60 1.2693 2.31 . Q . . . .
16.90 1.3194 1.73 . Q . . . .
17.20 1.3584 1.42 . Q . . . .
17.50 1.3910 1.22 . Q . . . .
17.80 1.4196 1.08 . Q . . . .
18.10 1.4453 0.99 .Q . . . .
18.40 1.4665 0.72 .Q . . . .
18.70 1.4836 0.66 .Q . . . .
19.00 1.4995 0.62 .Q . . . .
19.30 1.5144 0.58 .Q . . . .
19.60 1.5283 0.55 .Q . . . .
19.90 1.5415 0.52 .Q . . . .
20.20 1.5540 0.49 Q . . . .
20.50 1.5659 0.47 Q . . . .
20.80 1.5774 0.45 Q . . . .
21.10 1.5883 0.43 Q . . . .
21.40 1.5988 0.42 Q . . . .
21.70 1.6090 0.40 Q . . . .
22.00 1.6188 0.39 Q . . . .
22.30 1.6283 0.38 Q . . . .
22.60 1.6375 0.37 Q . . . .
22.90 1.6464 0.35 Q . . . .
23.20 1.6551 0.35 Q . . . .
23.50 1.6635 0.34 Q . . . .
23.80 1.6718 0.33 Q . . . .
24.10 1.6798 0.32 Q . . . .
24.40 1.6838 0.00 Q . . . .
---------------------------------------------------------------------------- -------------------------------------------------------------------------------- TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1440.8
10% 288.2
20% 72.0
30% 36.0
40% 18.0
50% 18.0
60% 18.0
70% 18.0
80% 18.0
90% 18.0
Item: 11
1441
_________________________________________________________________ ___________
***************************************************************** ***********
SMALL AREA UNIT HYDROGRAPH MODEL
================================================================= ===========
(C) Copyright 1989-2016 Advanced Engineering Software
(aes)
Ver. 23.0 Release Date: 07/01/2016 License ID
1499
Analysis prepared by:
***************************************************************** ***********
---------------------------------------------------------------- ------------
Problem Descriptions:
COSTCO FOOTHILL RANCH
PROPOSED 2 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------- ------------
RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 15.65
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.157
TIME OF CONCENTRATION(MIN.) = 9.46
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 2
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19
30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40
1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53
3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89
6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22
24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
---------------------------------------------------------------- 1 Item: 11
1442
------------
TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 2.39
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.28
***************************************************************** ***********
TIME VOLUME Q 0. 7.5 15.0 22.5
30.0 (HOURS) (AF) (CFS)
---------------------------------------------------------------- ------------
0.08 0.0014 0.45
Q . . . .
0.23 0.0073 0.45
Q . . . .
0.39 0.0132 0.46
Q . . . .
0.55 0.0191 0.46
Q . . . .
0.71 0.0251 0.46
Q . . . .
0.86 0.0312 0.46
Q . . . .
1.02 0.0372 0.47
Q . . . .
1.18 0.0433 0.47
Q . . . .
1.34 0.0495 0.47
Q . . . .
1.49 0.0557 0.48
Q . . . .
1.65 0.0619 0.48
Q . . . .
1.81 0.0681 0.48
Q . . . .
1.97 0.0745 0.49
Q . . . .
2.13 0.0808 0.49
Q . . . .
2.28 0.0872 0.49
Q . . . .
2.44 0.0937 0.50
Q . . . .
2.60 0.1002 0.50
Q . . . .
2.76 0.1067 0.50
Q . . . .
2.91 0.1133 0.51
Q . . . .
3.07 0.1199 0.51
2 Item: 11
1443
Q . . . .
3.23 0.1266 0.52
Q . . . .
3.39 0.1334 0.52
Q . . . .
3.54 0.1401 0.52
Q . . . .
3.70 0.1470 0.53
Q . . . .
3.86 0.1539 0.53
Q . . . .
4.02 0.1609 0.54
Q . . . .
4.18 0.1679 0.54
Q . . . .
4.33 0.1749 0.54
Q . . . .
4.49 0.1821 0.55
Q . . . .
4.65 0.1893 0.55
Q . . . .
4.81 0.1965 0.56
Q . . . .
4.96 0.2038 0.56
Q . . . .
5.12 0.2112 0.57
Q . . . .
5.28 0.2187 0.57
Q . . . .
5.44 0.2262 0.58
Q . . . .
5.59 0.2338 0.58
Q . . . .
5.75 0.2414 0.59
Q . . . .
5.91 0.2492 0.60
Q . . . .
6.07 0.2570 0.60
Q . . . .
6.22 0.2648 0.61
Q . . . .
6.38 0.2728 0.62
Q . . . .
6.54 0.2808 0.62
Q . . . .
6.70 0.2890 0.63
Q . . . .
6.86 0.2972 0.63
Q . . . .
7.01 0.3055 0.64
Q . . . .
7.17 0.3139 0.65
3 Item: 11
1444
Q . . . .
7.33 0.3224 0.66
Q . . . .
7.49 0.3309 0.66
Q . . . .
7.64 0.3396 0.67
Q . . . .
7.80 0.3484 0.68
Q . . . .
7.96 0.3573 0.69
Q . . . .
8.12 0.3663 0.69
Q . . . .
8.27 0.3754 0.70
Q . . . .
8.43 0.3846 0.71
Q . . . .
8.59 0.3939 0.72
Q . . . .
8.75 0.4034 0.73
Q . . . .
8.90 0.4130 0.74
Q . . . .
9.06 0.4227 0.75
Q . . . .
9.22 0.4325
0.76 .Q . . . .
9.38 0.4425
0.77 .Q . . . .
9.54 0.4527
0.79 .Q . . . .
9.69 0.4630
0.79 .Q . . . .
9.85 0.4734
0.81 .Q . . . .
10.01 0.4840
0.82 .Q . . . .
10.17 0.4948
0.84 .Q . . . .
10.32 0.5058
0.85 .Q . . . .
10.48 0.5170
0.87 .Q . . . .
10.64 0.5283
0.88 .Q . . . .
10.80 0.5399
0.90 .Q . . . .
10.95 0.5517
0.91 .Q . . . .
11.11 0.5637
0.93 .Q . . . .
11.27 0.5759
4 Item: 11
1445
0.95 .Q . . . .
11.43 0.5884
0.97 .Q . . . .
11.59 0.6012
0.99 .Q . . . .
11.74 0.6142
1.02 .Q . . . .
11.90 0.6275
1.03 .Q . . . .
12.06 0.6413
1.08 .Q . . . .
12.22 0.6569
1.31 .Q . . . .
12.37 0.6742
1.35 .Q . . . .
12.53 0.6920
1.37 .Q . . . .
12.69 0.7102
1.42 .Q . . . .
12.85 0.7289
1.44 .Q . . . .
13.00 0.7480
1.50 .Q . . . .
13.16 0.7677 1.53 .
Q . . . .
13.32 0.7880 1.59 .
Q . . . .
13.48 0.8089 1.62 .
Q . . . .
13.63 0.8305 1.69 .
Q . . . .
13.79 0.8529 1.74 .
Q . . . .
13.95 0.8761 1.83 .
Q . . . .
14.11 0.9002 1.88 .
Q . . . .
14.27 0.9259 2.06 .
Q . . . .
14.42 0.9531 2.13 .
Q . . . .
14.58 0.9818 2.28 .
Q . . . .
14.74 1.0120 2.36 .
Q . . . .
14.90 1.0442 2.57 .
Q . . . .
15.05 1.0786 2.70 .
Q . . . .
15.21 1.1158 3.02 .
Q . . . .
15.37 1.1565 3.23 .
5 Item: 11
1446
Q . . . .
15.53 1.1990 3.30 .
Q . . . .
15.68 1.2448 3.72 .
Q . . . .
15.84 1.3043 5.41 .
Q . . . .
16.00 1.3877 7.38 .
Q. . . .
16.16 1.5799 22.12 . . .
Q. .
16.32 1.7524 4.35 .
Q . . . .
16.47 1.8023 3.31 .
Q . . . .
16.63 1.8424 2.85 .
Q . . . .
16.79 1.8770 2.46 .
Q . . . .
16.95 1.9073 2.20 .
Q . . . .
17.10 1.9347 2.00 .
Q . . . .
17.26 1.9593 1.78 .
Q . . . .
17.42 1.9817 1.66 .
Q . . . .
17.58 2.0026 1.56 .
Q . . . .
17.73 2.0223
1.47 .Q . . . .
17.89 2.0410
1.40 .Q . . . .
18.05 2.0588
1.33 .Q . . . .
18.21 2.0743
1.05 .Q . . . .
18.36 2.0877
1.00 .Q . . . .
18.52 2.1004
0.96 .Q . . . .
18.68 2.1127
0.92 .Q . . . .
18.84 2.1245
0.89 .Q . . . .
19.00 2.1358
0.86 .Q . . . .
19.15 2.1468
0.83 .Q . . . .
19.31 2.1574
0.80 .Q . . . .
19.47 2.1677
6 Item: 11
1447
0.78 .Q . . . .
19.63 2.1777
0.76 .Q . . . .
19.78 2.1874 0.74
Q . . . .
19.94 2.1969 0.72
Q . . . .
20.10 2.2061 0.70
Q . . . .
20.26 2.2151 0.68
Q . . . .
20.41 2.2239 0.67
Q . . . .
20.57 2.2325 0.65
Q . . . .
20.73 2.2409 0.64
Q . . . .
20.89 2.2491 0.62
Q . . . .
21.05 2.2571 0.61
Q . . . .
21.20 2.2650 0.60
Q . . . .
21.36 2.2727 0.59
Q . . . .
21.52 2.2803 0.58
Q . . . .
21.68 2.2878 0.57
Q . . . .
21.83 2.2951 0.56
Q . . . .
21.99 2.3023 0.55
Q . . . .
22.15 2.3093 0.54
Q . . . .
22.31 2.3163 0.53
Q . . . .
22.46 2.3231 0.52
Q . . . .
22.62 2.3299 0.51
Q . . . .
22.78 2.3365 0.51
Q . . . .
22.94 2.3431 0.50
Q . . . .
23.09 2.3495 0.49
Q . . . .
23.25 2.3559 0.48
Q . . . .
23.41 2.3621 0.48
Q . . . .
23.57 2.3683 0.47
7 Item: 11
1448
Q . . . .
23.73 2.3744 0.47
Q . . . .
23.88 2.3805 0.46
Q . . . .
24.04 2.3864 0.45
Q . . . .
24.20 2.3894 0.00
Q . . . .
---------------------------------------------------------------- ------------
----------------------------------------------------------------- ---------------
TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1447.4
10% 141.9
20% 28.4
30% 18.9
40% 9.5
50% 9.5
60% 9.5
70% 9.5
80% 9.5
90% 9.5
8 Item: 11
1449
_________________________________________________________________ ___________
***************************************************************** ***********
SMALL AREA UNIT HYDROGRAPH MODEL
================================================================= ===========
(C) Copyright 1989-2016 Advanced Engineering Software
(aes)
Ver. 23.0 Release Date: 07/01/2016 License ID
1499
Analysis prepared by:
***************************************************************** ***********
---------------------------------------------------------------- ------------
Problem Descriptions:
COSTCO FOOTHILL RANCH
PROPOSED 100 YEAR UNIT HYDROGRAPH
KIMLEY-HORN
---------------------------------------------------------------- ------------
RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90
TOTAL CATCHMENT AREA(ACRES) = 15.65
SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000
LOW LOSS FRACTION = 0.157
TIME OF CONCENTRATION(MIN.) = 8.69
SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED
RETURN FREQUENCY(YEARS) = 100
5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.52
30-MINUTE POINT RAINFALL VALUE(INCHES) = 1.09
1-HOUR POINT RAINFALL VALUE(INCHES) = 1.45
3-HOUR POINT RAINFALL VALUE(INCHES) = 2.43
6-HOUR POINT RAINFALL VALUE(INCHES) = 3.36
24-HOUR POINT RAINFALL VALUE(INCHES) = 5.63
---------------------------------------------------------------- 1 Item: 11
1450
------------
TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 6.56
TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.78
***************************************************************** ***********
TIME VOLUME Q 0. 17.5 35.0 52.5
70.0 (HOURS) (AF) (CFS)
---------------------------------------------------------------- ------------
0.07 0.0000 0.00
Q . . . .
0.21 0.0074 1.24
Q . . . .
0.36 0.0222 1.24
Q . . . .
0.50 0.0371 1.25
Q . . . .
0.65 0.0521 1.26
Q . . . .
0.79 0.0672 1.27
Q . . . .
0.94 0.0824 1.27
Q . . . .
1.08 0.0976 1.28
Q . . . .
1.23 0.1130 1.29
Q . . . .
1.37 0.1284 1.30
Q . . . .
1.52 0.1440 1.30
Q . . . .
1.66 0.1596 1.31
Q . . . .
1.81 0.1754 1.32
Q . . . .
1.95 0.1912 1.33
Q . . . .
2.10 0.2072 1.33
Q . . . .
2.24 0.2232 1.35
Q . . . .
2.39 0.2394 1.35
Q . . . .
2.53 0.2556 1.36
Q . . . .
2.68 0.2720 1.37
Q . . . .
2.82 0.2885 1.38
2 Item: 11
1451
Q . . . .
2.97 0.3051 1.39
Q . . . .
3.11 0.3218 1.40
Q . . . .
3.25 0.3386 1.41
Q . . . .
3.40 0.3555 1.42
Q . . . .
3.54 0.3726 1.43
Q . . . .
3.69 0.3898 1.44
Q . . . .
3.83 0.4071 1.45
Q . . . .
3.98 0.4246 1.46
Q . . . .
4.12 0.4421 1.47
Q . . . .
4.27 0.4599 1.49
Q . . . .
4.41 0.4777 1.49
Q . . . .
4.56 0.4957 1.51
Q . . . .
4.70 0.5138 1.52
Q . . . .
4.85 0.5321 1.53
Q . . . .
4.99 0.5505 1.54
Q . . . .
5.14 0.5691 1.56
Q . . . .
5.28 0.5878 1.57
Q . . . .
5.43 0.6067 1.59
Q . . . .
5.57 0.6257 1.60
Q . . . .
5.72 0.6449 1.61
Q . . . .
5.86 0.6643 1.62
Q . . . .
6.01 0.6839 1.64
Q . . . .
6.15 0.7036 1.65
Q . . . .
6.30 0.7235 1.67
Q . . . .
6.44 0.7436 1.68
Q . . . .
6.59 0.7639 1.71
3 Item: 11
1452
Q . . . .
6.73 0.7844 1.72
Q . . . .
6.88 0.8050 1.74
Q . . . .
7.02 0.8259
1.75 .Q . . . .
7.17 0.8470
1.77 .Q . . . .
7.31 0.8683
1.79 .Q . . . .
7.45 0.8898
1.81 .Q . . . .
7.60 0.9116
1.82 .Q . . . .
7.74 0.9336
1.85 .Q . . . .
7.89 0.9558
1.86 .Q . . . .
8.03 0.9783
1.89 .Q . . . .
8.18 1.0010
1.91 .Q . . . .
8.32 1.0240
1.94 .Q . . . .
8.47 1.0473
1.95 .Q . . . .
8.61 1.0708
1.98 .Q . . . .
8.76 1.0946
2.00 .Q . . . .
8.90 1.1187
2.03 .Q . . . .
9.05 1.1432
2.05 .Q . . . .
9.19 1.1679
2.09 .Q . . . .
9.34 1.1930
2.10 .Q . . . .
9.48 1.2184
2.14 .Q . . . .
9.63 1.2441
2.16 .Q . . . .
9.77 1.2703
2.20 .Q . . . .
9.92 1.2968
2.22 .Q . . . .
10.06 1.3237
2.27 .Q . . . .
10.21 1.3509
2.29 .Q . . . .
10.35 1.3787
4 Item: 11
1453
2.34 .Q . . . .
10.50 1.4068
2.36 .Q . . . .
10.64 1.4354
2.42 .Q . . . .
10.79 1.4645
2.44 .Q . . . .
10.93 1.4941
2.50 .Q . . . .
11.08 1.5243
2.53 .Q . . . .
11.22 1.5549
2.59 .Q . . . .
11.37 1.5862
2.63 .Q . . . .
11.51 1.6180
2.70 .Q . . . .
11.65 1.6505
2.73 .Q . . . .
11.80 1.6836
2.81 .Q . . . .
11.94 1.7175
2.85 .Q . . . .
12.09 1.7540
3.25 .Q . . . .
12.23 1.7958 3.73 .
Q . . . .
12.38 1.8411 3.83 .
Q . . . .
12.52 1.8873 3.89 .
Q . . . .
12.67 1.9346 4.00 .
Q . . . .
12.81 1.9829 4.06 .
Q . . . .
12.96 2.0323 4.20 .
Q . . . .
13.10 2.0830 4.27 .
Q . . . .
13.25 2.1349 4.42 .
Q . . . .
13.39 2.1883 4.50 .
Q . . . .
13.54 2.2432 4.68 .
Q . . . .
13.68 2.2998 4.77 .
Q . . . .
13.83 2.3582 4.99 .
Q . . . .
13.97 2.4186 5.10 .
Q . . . .
14.12 2.4814 5.38 .
5 Item: 11
1454
Q . . . .
14.26 2.5468 5.54 .
Q . . . .
14.41 2.6150 5.86 .
Q . . . .
14.55 2.6863 6.05 .
Q . . . .
14.70 2.7613 6.48 .
Q . . . .
14.84 2.8403 6.73 .
Q . . . .
14.99 2.9244 7.33 .
Q . . . .
15.13 3.0143 7.69 .
Q . . . .
15.28 3.1118 8.60 .
Q . . . .
15.42 3.2183 9.19 .
Q . . . .
15.57 3.3309 9.62 .
Q . . . .
15.71 3.4534 10.84 .
Q . . . .
15.86 3.6106 15.43 .
Q . . . .
16.00 3.8289 21.06 . .
Q . . .
16.14 4.3353 63.54 . . . .
Q .
16.29 4.7910 12.60 .
Q . . . .
16.43 4.9192 8.83 .
Q . . . .
16.58 5.0206 8.11 .
Q . . . .
16.72 5.1111 7.01 .
Q . . . .
16.87 5.1905 6.25 .
Q . . . .
17.01 5.2620 5.69 .
Q . . . .
17.16 5.3274 5.23 .
Q . . . .
17.30 5.3878 4.88 .
Q . . . .
17.45 5.4445 4.59 .
Q . . . .
17.59 5.4979 4.34 .
Q . . . .
17.74 5.5486 4.13 .
Q . . . .
17.88 5.5969 3.94 .
6 Item: 11
1455
Q . . . .
18.03 5.6432 3.78 .
Q . . . .
18.17 5.6831
2.89 .Q . . . .
18.32 5.7170
2.77 .Q . . . .
18.46 5.7495
2.66 .Q . . . .
18.61 5.7807
2.56 .Q . . . .
18.75 5.8109
2.47 .Q . . . .
18.90 5.8400
2.39 .Q . . . .
19.04 5.8681
2.32 .Q . . . .
19.19 5.8954
2.25 .Q . . . .
19.33 5.9219
2.18 .Q . . . .
19.48 5.9477
2.12 .Q . . . .
19.62 5.9728
2.07 .Q . . . .
19.77 5.9972
2.02 .Q . . . .
19.91 6.0210
1.97 .Q . . . .
20.06 6.0443
1.92 .Q . . . .
20.20 6.0670
1.88 .Q . . . .
20.34 6.0892
1.84 .Q . . . .
20.49 6.1110
1.80 .Q . . . .
20.63 6.1323
1.76 .Q . . . .
20.78 6.1532 1.73
Q . . . .
20.92 6.1737 1.69
Q . . . .
21.07 6.1938 1.66
Q . . . .
21.21 6.2135 1.63
Q . . . .
21.36 6.2329 1.60
Q . . . .
21.50 6.2519 1.58
Q . . . .
21.65 6.2706 1.55
7 Item: 11
1456
Q . . . .
21.79 6.2891 1.53
Q . . . .
21.94 6.3072 1.50
Q . . . .
22.08 6.3250 1.48
Q . . . .
22.23 6.3426 1.46
Q . . . .
22.37 6.3599 1.44
Q . . . .
22.52 6.3770 1.42
Q . . . .
22.66 6.3938 1.40
Q . . . .
22.81 6.4104 1.38
Q . . . .
22.95 6.4268 1.36
Q . . . .
23.10 6.4429 1.34
Q . . . .
23.24 6.4589 1.32
Q . . . .
23.39 6.4746 1.31
Q . . . .
23.53 6.4902 1.29
Q . . . .
23.68 6.5055 1.28
Q . . . .
23.82 6.5207 1.26
Q . . . .
23.97 6.5357 1.25
Q . . . .
24.11 6.5505 1.23
Q . . . .
24.26 6.5579 0.00
Q . . . .
---------------------------------------------------------------- ------------
----------------------------------------------------------------- ---------------
TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE:
(Note: 100% of Peak Flow Rate estimate assumed to have
an instantaneous time duration)
Percentile of Estimated Duration
Peak Flow Rate (minutes)
======================= =========
0% 1442.5
10% 130.3
20% 26.1
8 Item: 11
1457
30% 17.4
40% 8.7
50% 8.7
60% 8.7
70% 8.7
80% 8.7
90% 8.7
9 Item: 11
1458
15 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix G –Basin Routing
Calculations
Item: 11
1459
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2024 Friday, 05 / 16 / 2025 Hyd. No. 2
Basin Routing
Hydrograph type = Reservoir Peak discharge = 21.66 cfs
Storm frequency = 2 yrs Time to peak = 15.30 hrs
Time interval = 9 min Hyd. volume = 98,411 cuft
Inflow hyd. No. = 1 - STORM INFLOW Max. Elevation = 101.80 ft Reservoir name = Basin Max. Storage = 1,153 cuft
Storage Indication method used.
4.2 6.3 8.4 10.5 12.6 14.7 16.8 18.9 21.0 23.1
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (hrs)
Basin Routing
Hyd. No. 2 -- 2 Year
Hyd No. 2 Hyd No. 1 Total storage used = 1,153 cuft
Item: 11
1460
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2024 Friday, 05 / 16 / 2025 Hyd. No. 2
Basin Routing
Hydrograph type = Reservoir Peak discharge = 38.97 cfs
Storm frequency = 10 yrs Time to peak = 15.30 hrs
Time interval = 9 min Hyd. volume = 179,678 cuft
Inflow hyd. No. = 1 - STORM INFLOW Max. Elevation = 103.02 ft Reservoir name = Basin Max. Storage = 2,061 cuft
Storage Indication method used.
0.0 2.1 4.2 6.3 8.4 10.5 12.6 14.7 16.8 18.9 21.0 23.1
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (hrs)
Basin Routing
Hyd. No. 2 -- 10 Year
Hyd No. 2 Hyd No. 1 Total storage used = 2,061 cuft
Item: 11
1461
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2024 Friday, 05 / 16 / 2025 Hyd. No. 2
Basin Routing
Hydrograph type = Reservoir Peak discharge = 60.09 cfs
Storm frequency = 100 yrs Time to peak = 15.30 hrs
Time interval = 9 min Hyd. volume = 278,422 cuft
Inflow hyd. No. = 1 - STORM INFLOW Max. Elevation = 104.50 ft Reservoir name = Basin Max. Storage = 2,916 cuft
Storage Indication method used.
0.0 2.1 4.2 6.3 8.4 10.5 12.6 14.7 16.8 18.9 21.0 23.1
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (hrs)
Basin Routing
Hyd. No. 2 -- 100 Year
Hyd No. 2 Hyd No. 1 Total storage used = 2,916 cuft
Item: 11
1462
Item: 11
1463
Item: 11
1464
Item: 11
1465
Item: 11
1466
16 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix H – Hydraulic Calculations
Item: 11
1467
17 Costco Foothill Ranch Preliminary Hydrology Report
November 2025
Appendix I – Kleinfelder Drainage
Report
Item: 11
1468
25003229.001A/LH25R178197 Page 1 of 1 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
24411 Ridge Route Dr. Suite 225, Laguna Hills 92653 p | 949.727.4466 f | 949.727.9242 April 4, 2025
Kleinfelder Project No. 25003229.001A
Costco Wholesale
9 Corporate Park
Irvine, California 92606
Attention: Mr. Michael Okuma
AVP Real Estate Development
SUBJECT: Geotechnical Study
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
CW# 24-1218
Dear Mr. Okuma:
Kleinfelder is pleased to present this report summarizing our geotechnical study for the proposed Costco Wholesale Warehouse located at 26602 Towne Centre Drive in Foothill Ranch, California.
The conclusions and recommendations presented in this report are subject to the limitations presented in Section 7.
We appreciate the opportunity to provide geotechnical engineering services to you on this project.
If you have any questions regarding this report or if we can be of further service, please do not hesitate to contact Brian Crystal 949.727.4466, or Andy Franks, Kleinfelder’s Client Account Manager for Costco at 480.650.4905.
Sincerely,
KLEINFELDER
Hector Marquez, PE Brian E. Crystal, PE, GE
Project Engineer Senior Project Manager
Item: 11
1469
Copyright 2025 Kleinfelder
All Rights Reserved
ONLY THE CLIENT OR ITS DESIGNATED REPRESENTATIVES MAY USE THIS DOCUMENT AND ONLY FOR THE SPECIFIC PROJECT FOR WHICH THIS REPORT WAS PREPARED.
25003229.001A/LH25R178197 Page i of iv April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
GEOTECHNICAL STUDY
PROPOSED COSTCO WHOLESALE WAREHOUSE
26602 TOWNE CENTRE DRIVE
FOOTHILL RANCH, CALIFORNIA
CW# 24-1218
KLEINFELDER PROJECT NO. 25003229.001A
APRIL 4, 2025
Item: 11
1470
25003229.001A/LH25R178197 Page ii of iv April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
A Report Prepared for:
Costco Wholesale
9 Corporate Park
Irvine, California 92606
Attention: Mr. Michael Okuma
AVP Real Estate Development
GEOTECHNICAL STUDY
PROPOSED COSTCO WHOLESALE WAREHOUSE
26602 TOWNE CENTRE DRIVE
FOOTHILL RANCH, CALIFORNIA
CW# 24-1218
Hector Marquez, PE
Project Engineer
Brian E. Crystal, PE, GE
Senior Project Manager
KLEINFELDER
24411 Ridge Route Drive, Suite 225
Laguna Hills, California
Phone: 949.727.4466
Fax: 949.727.9242
April 4, 2025
Kleinfelder Project No. 25003229.001A
Item: 11
1471
April 4, 2025 Page 1 of 5
Geotechnical Investigation Summary Checklist for Costco Wholesale Projects
General Information
Costco Real Estate Main Contact: Michael Okuma
Geotechnical Main Contact: Brian Crystal (949.585.3113) Geotechnical Engineer of Record: Kleinfelder
Project Location: 26602 Towne Centre Drive, Foothill Ranch, CA CW#: 24-1218
Warehouse #: N/A
Report Date: April 4, 2025
Consultant Project/Document Number: 25003229.001A/LH25R178197 Addendums (List):
Report Purpose: ☐ Preliminary ☐ Draft ☒ Final ☐ Addendum/Revision Yes
No
or
NA
Describe/ Comments Report
Section
Pre-existing Conditions/Information
Developer provided geotechnical report (describe): ☐ ☒
Pre-existing development (describe) ☒ ☐ Existing commercial development 2.1 Foundation type (describe): ☐ ☒
Performance Issues (describe): ☐ ☒
Environmental Issues (describe) ☐ ☒
Site Grading Records (stripping,compaction test
results,field reports, etc.) ☐ ☒
Typical Building Structural Design Criteria
Other (describe): ☒ ☐ New Costco Warehouse 1.1
Building size (describe): ☒ ☐
160,132-square-foot Costco
Wholesale Warehouse 1.1
Typical wall loading
3 kips / foot* (Metal Buildings) ☐ ☒
4.5 kips / foot* (CMU or pre-cast) ☒ ☐ Both CMU and Metal 1.1 Typical column loading
120 kips in non-snow regions ☒ ☐ 1.1
150 kips in snow regions ☐ ☒
Typical canopy loading: 50 kips ☒ ☐ 1.1
Typical floor slab loading
500 pounds per square foot, (psf, total) ☒ ☐ 1.1
250 psf (dead) at rack areas ☒ ☐
150 psf (dead) at non-rack areas ☒ ☐
350 psf (live) ☒ ☐
Paving Design (20 year life)
Heavy Duty paving shall accommodate 30 trucks per
day (Traffic Index of 7.0) ☒ ☐ 4.8
Light Duty paving shall accommodate 6,600 cars per
day (Traffic Index of 5.0) ☒ ☐ 4.8
Performance Grade (PG) binder oil identified for local
climate conditions ☒ ☐ PG 64-10 4.8.3
Yes No Describe/ Comments Report
Item: 11
1472
April 4, 2025 Page 2 of 5
or
NA
Section
Site Grading Conditions/Assumptions
Deviations to Typical Criteria (list/describe): ☐ ☒
Design Finished Floor Elevation (FFE) (describe): ☒ ☐ Elevation 782.22 feet 1.1 Basis for FFE (assumed, per Civil) (describe): ☒ ☐ Preliminary Grading Plan 1.1 Effects of change to assumed FFE (describe): ☐ ☒
Maximum anticipated cuts (describe): ☒ ☐ Less than 2 feet 1.1 Maximum anticipated fills (describe): ☒ ☐ Less than 6 feet 1.1 Cross sections prepared for sites that are not essentially flat ☒ ☐ Figures 3-6
Amount of import/export anticipated (describe): ☐ ☒ 1.1 Frost Depth (describe): ☐ ☒
Retaining walls
Number of walls (describe): ☒ ☐
1 wall proposed on the west
boundary of the site 1.1
Height/Length of walls (describe): ☒ ☐ Up to approx.6 feet-in height 1.1 Wall construction/type (describe): ☐ ☒
Cut/fill transition in pad (describe): ☐ ☒
Offsite Improvements (describe) ☐ ☒
Fieldwork/Results
Costco Due Diligence Design Criteria
Version (describe): ☒ ☐ Version 2022, dated Oct. 28, 2022 1.1 Followed Criteria? ☒ ☐
Deviations to standard investigation (describe): ☐ ☒
Groundwater
Depth (describe): ☒ ☐
Groundwater was not encountered
during our investigation which was
drilled to an approximate depth of
49½ feet bgs.
3.3 Perched ☒ ☐
Perched groundwater should be
expected during and following
periods of rainfall
3.3 Expected seasonal fluctuation (describe): ☐ ☒
Piezometers installed? ☐ ☒
Unusual/Challenging Soils conditions encountered
Moisture-sensitive soils ☐ ☒
Undocumented fill ☒ ☐
Artificial fill associated with
previous grading at the site was
observed at depths ranging from
approximately 4 to 9½ feet bgs.
3.2 Unsuitable soils (require removal) ☒ ☐ Unsuitable fill soils 5.2.2 Wet soils ☐ ☒
Debris ☐ ☒
Bedrock/potential non-rippable conditions ☒ ☐ Capistrano Formation sandstone 5.2.6 Refusal ☐ ☒ 5.2.6
Collapsible soils ☐ ☒
Item: 11
1473
April 4, 2025 Page 3 of 5
Expansive soils ☐ ☒
Yes
No
or
NA
Describe/ Comments Report
Section
Compressible soils ☐ ☒
Liquefaction ☐ ☒
Sinkholes ☐ ☒
Other (describe): ☐ ☒
Potential Contamination Identified
Soil ☐ ☒
Groundwater ☐ ☒
Restoration of Disturbed Areas
Backfilled with soil ☒ ☐
Borings were backfilled with soil
cuttings 1.2.2
Backfilled with grout ☐ ☒
Other (describe): ☐ ☒
Topsoil samples collected/analyzed ☐ ☒ Developed site
Corrosivity testing performed/addressed ☒ ☐
Highly corrosive potential to ferrous
metals 4.9
Culinary water quality testing performed ☐ ☒
Report
Executive summary ☒ ☐ ES-1
Wet weather construction recommendations ☐ ☒
Pad winterization/pad recommendations ☐ ☒
Frost protection recommendations ☐ ☒
Design Parameters
Fill material parameters provided
Structural fill (below foundations, slabs) ☒ ☐ 5.2.2
Site grading fill (below pavements, flatwork) ☒ ☐ 5.2.2 Select backfill (behind truck dock walls, foundations,
grade beams, etc.) ☒ ☐ 5.2.4
Trench backfill ☒ ☐ 5.2.8
Drainage fill ☐ ☒
Frost resistant fill ☐ ☒
Slab base aggregate ☒ ☐ Aggregate Base Material 4.4
Limits of debris/unsuitable removal provided ☒ ☐ 5.2.2
Over-excavation/recompaction required ☒ ☐ 5.2.2
Yes
No
or
NA
Describe/ Comments Report
Section
Depth (describe): ☒ ☐
Soils within 10 feet of the
warehouse pad should be
overexcavated to a depth of at
least 5 feet below existing grade or
3 feet below the bottom of the
footings and floor slabs, whichever
is deeper, and replaced as
structural fill.
5.2.2 Item: 11
1474
April 4, 2025 Page 4 of 5
Extent (include cross-section diagram) ☐ ☒
Pad subgrade stabilization required (describe): ☐ ☒ Recommendations provided 5.3 Surcharge ☐ ☒
Height (describe): ☐ ☒
Lateral extent (describe): ☐ ☒
Estimated duration (describe): ☐ ☒
Shallow Foundations ☒ ☐
psf allowable soil bearing pressure (describe): ☒ ☐ 3,000 psf 4.3.2 Deep Foundations ☒ ☐ For light poles 4.3.3
Type (describe): ☒ ☐ Drilled piles
Options and Value Engineering Matrix provided ☐ ☒
Floor Slabs
Unreinforced (>2500 psf) ☒ ☐ 4.4
Reinforced (describe why) ☐ ☒
Subgrade modulus (ksi/in) (describe): ☒ ☐ 150 pci 4.4
Base Material thickness (min 6") (describe): ☒ ☐ 6 inches of AB 4.4 Seismic Conditions
Governing Building Code (IBC, UBC, other) ☒ ☐ 2022 CBC 4.2.1 Geologic Hazard Identified ☒ ☐ 3.4
Proximity to earthquake fault zone(s) ☒ ☐ 3.4.1
Proximity to seismic hazard zone(s) ☐ ☒
Potential for liquefaction ☐ ☒
Potential for lateral spreading ☐ ☒
Potential for seismic settlement ☐ ☒
Potential for slope stability/landslides ☐ ☒
Potential for groundshaking or geologic hazards ☐ ☒
Retaining Walls ☒ ☐ 4.7
Recommended Wall Types ☐ ☒
Recommend Kleinfelder Design ☐ ☒
Lateral earth pressure design values ☒ ☐ 4.7
Active: ☒ ☐ 4.7
At-rest: ☒ ☐ 4.7
Passive: ☒ ☐ 4.7
Seismic: ☒ ☐ 4.7
Backfill material, placement requirements ☒ ☐ 4.7
Yes
No
or
NA
Describe/ Comments Report
Section
Drainage requirements and cross-section drawing ☐ ☒
Finger Drains ☐ ☒
Required for frost ☐ ☒
Recommended for long term maintenance and
constructability ☐ ☒
Pavement
Item: 11
1475
April 4, 2025 Page 5 of 5
Pavement subgrade stabilization required (describe): ☐ ☒ 5.2.2 Costco asphalt mix design specified ☒ ☐ 4.8.3
Heavy and light duty pavement sections specified ☒ ☐ 4.8.2 Alternative pavement sections identified ☒ ☐ PCC pavement 4.8.4 Specification for offsite pavement sections included ☐ ☒ Data Gaps/Unknowns (describe): ☐ ☒
Item: 11
1476
TABLE OF CONTENTS
Section Page
25003229.001A/LH25R178197 Page iii of iv April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
EXECUTIVE SUMMARY.........................................................................................................ES-1 1 INTRODUCTION ...............................................................................................................1
1.1 PROJECT DESCRIPTION.....................................................................................1
1.2 SCOPE OF SERVICES .........................................................................................2
1.2.1 Task 1 – Background Data Review............................................................2
1.2.2 Task 2 – Field Exploration..........................................................................2
1.2.3 Task 3 – Laboratory Testing ......................................................................3
1.2.4 Task 4 – Geotechnical Analyses................................................................3
1.2.5 Task 5 – Report Preparation ......................................................................3 2 SITE CONDITIONS ...........................................................................................................5
2.1 SITE DESCRIPTION .............................................................................................5 3 GEOLOGY.........................................................................................................................6
3.1 GEOLOGIC SETTING ...........................................................................................6
3.1.1 Site Geology...............................................................................................6
3.2 SUBSURFACE CONDITIONS...............................................................................6
3.3 GROUNDWATER ..................................................................................................7
3.4 ASSESSMENT OF POTENTIAL GEOLOGIC HAZARDS .....................................8
3.4.1 Localized Faulting and Seismicity ..............................................................8
3.4.2 Landsliding ...............................................................................................10
3.4.3 Liquefaction and Seismic Compression ...................................................10
3.4.4 Expansive Soils........................................................................................11
3.4.5 Flooding ...................................................................................................11
3.4.6 Oil and Gas Fields....................................................................................12
3.4.7 Land Subsidence .....................................................................................12 4 GEOTECHNICAL DESIGN RECOMMENDATIONS.......................................................13
4.1 GENERAL............................................................................................................13
4.2 SEISMIC DESIGN CONSIDERATIONS ..............................................................15
4.2.1 2022 CBC Seismic Design Parameters ...................................................15
4.3 FOUNDATIONS...................................................................................................16
4.3.1 General ....................................................................................................16
4.3.2 Shallow Foundations................................................................................16
4.3.3 Short Drilled Pile Foundations..................................................................17
4.4 BUILDING SLAB-ON-GRADE .............................................................................18
4.5 EXTERIOR FLATWORK......................................................................................19
4.6 SITE DRAINAGE .................................................................................................19
4.7 RETAINING STRUCTURES................................................................................20
4.8 PAVEMENT SECTIONS......................................................................................22
4.8.1 Costco Pavement Design Parameters .....................................................23
4.8.2 Asphalt Concrete Pavement ....................................................................23
4.8.3 Asphalt Performance Grade Binder .........................................................24
4.8.4 Portland Cement Concrete Pavement .....................................................24
4.8.5 Aggregate Base .......................................................................................24
4.8.6 Pavement Maintenance ...........................................................................24
4.9 SOIL CORROSIVITY ...........................................................................................25
4.10 STORMWATER MANAGEMENT ........................................................................25 Item: 11
1477
TABLE OF CONTENTS (continued)
Section Page
25003229.001A/LH25R178197 Page iv of iv April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
5 CONSTRUCTION RECOMMENDATIONS .....................................................................27
5.1 GENERAL............................................................................................................27
5.2 EARTHWORK......................................................................................................27
5.2.1 General ....................................................................................................27
5.2.2 Site Preparation .......................................................................................27
5.2.3 Foundation Excavations...........................................................................28
5.2.4 Fill Material and Compaction Criteria .......................................................29
5.2.5 Shrinkage/Bulking ....................................................................................30
5.2.6 Excavation Characteristics.......................................................................30
5.2.7 Temporary Excavations ...........................................................................31
5.2.8 Trench Backfill..........................................................................................31
5.3 UNSTABLE SUBGRADE CONDITIONS .............................................................32
5.4 TEMPORARY SHORING ....................................................................................33
5.4.1 Lateral Pressures .....................................................................................33
5.4.2 Design of Soldier Piles .............................................................................34
5.4.3 Lagging ....................................................................................................34
5.4.4 Deflection .................................................................................................35
5.4.5 Monitoring ................................................................................................35
5.5 EXTERIOR FLATWORK......................................................................................35
5.6 PAVEMENTS.......................................................................................................35
5.6.1 HMA Design .............................................................................................35
5.6.2 Construction Considerations ....................................................................36 6 ADDITIONAL SERVICES ...............................................................................................37
6.1 PLANS AND SPECIFICATIONS REVIEW ..........................................................37
6.2 CONSTRUCTION OBSERVATION AND TESTING............................................37 7 LIMITATIONS..................................................................................................................38 8 REFERENCES ................................................................................................................40 TABLES
1 Summary of Significant Holocene-Active Faults Near the Project Site 2 2022 CBC Seismic Design Parameters
3 Lateral Earth Pressures for Retaining Structures (Granular Backfill) 4 Recommended Minimum Asphalt Concrete Pavement Sections 5 Corrosion Test Results
6 Summary of Infiltration Test Results
7 Structural Fill Placement And Compaction Criteria
FIGURES
1 Site Vicinity Map
2 Exploration Location Map
3 – 6 Cross Section A-A’, B-B’, C-C’, and D-D’
APPENDICES
A Field Explorations
B Laboratory Testing
C Infiltration Test Results
Item: 11
1478
25003229.001A/LH25R178197 Page ES-1 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
EXECUTIVE SUMMARY
This report presents the results of Kleinfelder’s geotechnical study for the proposed Costco Wholesale Warehouse (CW# 24-1218) located at 26602 Towne Centre Drive in Foothill Ranch, California. The purpose of our geotechnical study was to evaluate soil and groundwater conditions at the site and provide geotechnical recommendations for project design and construction. We based our study on the Costco Wholesale Development Requirements (CWDRs), Version 2022, dated October 28, 2022.
Kleinfelder understands Costco plans to purchase an approximately 16.27-acre site to construct a new approximately 160,132-square-foot warehouse. The warehouse building will be a singlestory, steel-framed and concrete-masonry-unit structure (30 feet in height). The building surroundings will consist mainly of surface parking with some landscape areas. Parking and drive areas will be paved with either Portland cement concrete or asphalt concrete pavements. A retaining wall up to approximately 6 feet in height is proposed on the west boundary of the site.
Surface elevations interpreted from an ALTA survey (PBLA Surveying, Inc., 2025) provided by the design team indicates that the existing grades vary from a high of approximately 790 feet at the north portion of the site to a low of approximately 775 feet on the south portion of the site.
Based on the preliminary grading plans prepared by Kimley Horn (the project civil engineer), we understand that the finished floor elevation for the building slab will be established at approximately 782.22 feet. Cuts less than 2 feet and fills less than 6 feet are anticipated to achieve the desired site grades.
The proposed Costco site is located southeast of Highway 241 and Alton Parkway at 26602 Towne Centre Drive in Foothill Ranch, California, as shown on Figure 1. The site is currently developed with an existing theatre building, which will be demolished, in the southwest portion of the site surrounded by asphalt surface parking. The existing development is situated on a previously graded pad with 2:1 (horizontal to vertical) descending slope, up to approximately 30 feet in height, on the western portion of the site.
Subsurface conditions at the site were explored by drilling 28 borings. In addition, 4 borehole infiltration tests were performed. A total of 15 borings were advanced in the building area; and 13 borings and 4 infiltration tests were advanced in the parking and drive areas. The borings were drilled using truck-mounted, hollow-stem-auger drilling equipment to depths between approximately 21½ and 49½ feet below the existing ground surface (bgs) in the warehouse Item: 11
1479
25003229.001A/LH25R178197 Page ES-2 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
building area, and between approximately 11½ and 26½ feet bgs in the parking and drive areas.
The borehole infiltration tests were drilled to depths of approximately 5 or 10 feet bgs.
The soils encountered within the borings generally consisted of artificial fill overlying sandstone of the Capistrano Formation. Artificial fill associated with previous grading at the site was observed at depths ranging from approximately 4 to 9½ feet bgs. The fill generally consisted of silty to clayey sand with varying amounts of gravel. The deepest fill was observed along the northwest side of the project site. Based on historical topographic maps, the fill may be deepest along the northwest boundary due to a northwest descending slope. Capistrano Formation sandstone was encountered below the fill to the maximum depth explored of approximately 49½ feet bgs. The sandstone was generally highly weathered and excavates as poorly to well graded sand and silty sand.
Groundwater was not encountered in our borings to the maximum depth explored of approximately 49½ feet bgs. Groundwater is not anticipated to be encountered within the depth of influence of the foundations or excavations planned for the proposed improvements.
Based on the results of our field exploration, and observations during this exploration, it is our professional opinion that the proposed project is geotechnically feasible, provided the recommendations presented in the geotechnical report are incorporated into the project design and construction. We identified the following key geotechnical considerations during our study. • The proposed Costco warehouse and retaining wall may be supported on a conventional shallow foundation system. Overexcavation and recompaction of the onsite soils is recommended in the upper fill soils within the warehouse building pad to provide relatively uniform support for the proposed warehouse and other improvements.
• Light poles may be supported on drilled pile foundations. It should be noted that drilling of the pile shafts may require heavy-duty excavation equipment, and possibly rock coring equipment, to excavate through the Capistrano Formation sandstone. • Soils within 10 feet of the warehouse pad (including the entrance canopy, building aprons, utility pads, stairs, ramps, stoops, and the loading dock) should be overexcavated to a depth of at least 5 feet below existing grade or 3 feet below the bottom of the footings and floor slabs, whichever is deeper, and replaced as structural fill. Depending on the condition of the existing fill at the base of the excavation, additional overexcavation may be required. The overexcavated soils can be moisture conditioned and recompacted as structural fill.
Item: 11
1480
25003229.001A/LH25R178197 Page ES-3 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
• For pavement, sidewalk, and flatwork areas, we recommend that the exposed subgrade be proof-rolled with heavy construction equipment (e.g. loader or smoothdrum roller) after the area has been stripped of soft earth materials and construction debris to disclose areas of soft and yielding material. Where soft and yielding material is observed, it should be overexcavated and replaced as structural fill. The proof-rolling should extend beyond the proposed improvements a horizontal distance of at least 2 feet, where possible.
• For the retaining wall on the west boundary of the site, soils should be overexcavated to a depth of at least 2 feet below existing grade or 2 feet below the bottom of the footing, whichever is deeper. The overexcavated soils can be moisture conditioned and recompacted as structural fill. The overexcavation should extend beyond the proposed improvements a horizontal distance of at least 2 feet. • Following overexcavation and prior to replacing soils, the exposed subgrade should be proof rolled with at least a 10-ton roller, fully loaded tandem-axle dump truck or water truck. Areas identified as being soft or yielding may require additional compaction or overexcavation, as determined by Kleinfelder. Following proof rolling and any additional overexcavation, the exposed subgrade should be scarified at least 6 to 8 inches, moisture conditioned, and recompacted.
• For earthwork volume estimating purposes, an average shrinkage value of 5 to 10 percent for the upper surficial soils (generally in the upper 5 to 6 feet) may be assumed.
These values are estimates only and exclude losses due to removal of vegetation or debris. Actual shrinkage/bulking factors will depend on the types of earthmoving equipment used and should be determined during grading. We recommend that the civil engineer or the contractor contact a local earthwork contractor to confirm these values prior to finalizing any earthwork estimates.
• Foundation and slab performance depends greatly on proper irrigation and how well runoff water drains from the site. We recommend that landscape planters either not be located adjacent to structures and pavement areas or be isolated and properly drained to area drains such that cycles of wetting and drying do not impact pavements, flatwork, and other structures. Drought resistant plants and minimum watering are recommended for planters, if used. Planters should be built such that water exiting from them will not seep into the foundation areas or beneath slabs and pavement. • Minimum resistivity values of the samples tested indicate that the soil may be highly corrosive to ferrous metals. The concentrations of soluble sulfates indicate that the subsurface soils represent a Class S0 Class S0 exposure to sulfate attack on concrete Item: 11
1481
25003229.001A/LH25R178197 Page ES-4 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
in contact with the soil based on ACI 318-14 Table 19.3.1.1. Therefore, in accordance with ACI Building Code 318-19, no special provisions for selection of cement type are required.
• We have assessed the potential for storm water infiltration into the subgrade soils at the subject project site. Four borehole infiltration tests were performed at depths of approximately 5 and 10 feet bgs. Based on the results of our infiltration testing, it is our opinion that the site is not suitable for onsite infiltration. We recommend alternatives to infiltration Best Management Practices (BMPs), such as biofiltration/bio-retention systems (bio-swales and planter boxes), be implemented at the project site.
The findings, conclusions, and recommendations presented in this executive summary should not be relied upon without consulting our geotechnical report for more information. The conclusions and recommendations presented in this report are subject to the limitations presented in Section 7.
Item: 11
1482
25003229.001A/LH25R178197 Page 1 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
1 INTRODUCTION
This report presents the results of Kleinfelder’s geotechnical study for the proposed Costco Wholesale Warehouse (CW# 24-1218) located at 26602 Towne Centre Drive in Foothill Ranch, California. The location of the project site is presented on Figure 1, Site Vicinity Map. The purpose of our geotechnical study was to evaluate soil and groundwater conditions at the site and provide geotechnical recommendations for project design and construction. The scope of our services was presented in our proposal titled, “Proposal for Geotechnical Study, Proposed Costco Wholesale Warehouse and Fuel Facility, 26602 Towne Centre Drive, Foothill Ranch, California, CW# 24-1218,” dated November 15, 2024. We based our study on the Costco Wholesale Development Requirements (CWDRs), Version 2022, dated October 28, 2022.
This report presents a description of the services performed, a discussion of the geotechnical conditions observed at the site, and recommendations developed from our engineering analyses of field and laboratory data. Individuals using this report should read the limitations presented in Section 7.
1.1 PROJECT DESCRIPTION
Kleinfelder understands Costco plans to purchase an approximately 16.27-acre site to construct a new approximately 160,132-square-foot warehouse. The warehouse building will be a singlestory, steel-framed and concrete-masonry-unit structure (30 feet in height). The building surroundings will consist mainly of surface parking with some landscape areas. Parking and drive areas will be paved with either Portland cement concrete or asphalt concrete pavements. A retaining wall up to approximately 6 feet in height is proposed on the west boundary of the site.
Based on the CWDRs, we understand maximum column loads will be on the order of 120 kips, typical wall loads will be approximately 4.5 kips per lineal foot, canopy column loads will be approximately 50 kips, and the total slab load (dead plus live loads) will be approximately 500 psf.
Surface elevations interpreted from an ALTA survey (PBLA Surveying, Inc., 2025) provided by the design team indicates that the existing grades vary from a high of approximately 790 feet at the north portion of the site to a low of approximately 775 feet on the south portion of the site.
Based on the preliminary grading plans prepared by Kimley Horn (the project civil engineer), we understand that the finished floor elevation for the building slab will be established at approximately 782.22 feet. Cuts less than 2 feet and fills less than 6 feet are anticipated to achieve the desired site grades.
Item: 11
1483
25003229.001A/LH25R178197 Page 2 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
1.2 SCOPE OF SERVICES
The scope of our geotechnical study consisted of a literature review, subsurface explorations, geotechnical laboratory testing, engineering evaluation and analysis, and preparation of this report. Studies to assess environmental hazards that may affect the soil and groundwater at the site were beyond our geotechnical scope of services. The following paragraphs present a description of our services.
1.2.1 Task 1 – Background Data Review
We reviewed readily available published and unpublished geologic literature in our files and the files of public agencies, including selected publications prepared by the California Geological Survey and the U.S. Geological Survey. We also reviewed readily available seismic and faulting information, including data for designated earthquake fault zones and our in-house database of faulting in the general site vicinity.
1.2.2 Task 2 – Field Exploration
Because the site is developed, our field exploration could not be performed in full accordance with the CWDRs (i.e. could not perform test pits or any field exploration in areas of existing buildings).
Subsurface conditions at the site were explored by drilling 28 borings. In addition, 4 borehole infiltration tests were performed. A total of 15 borings were advanced in the building area; and 13 borings and 4 infiltration tests were advanced in the parking and drive areas. The borings were drilled using truck-mounted, hollow-stem-auger drilling equipment to depths between approximately 21½ and 49½ feet below the existing ground surface (bgs) in the warehouse building area, and between approximately 11½ and 26½ feet bgs in the parking and drive areas.
The borehole infiltration tests were drilled to depths of approximately 5 or 10 feet bgs. The approximate locations of the borings and infiltration tests are presented on Figure 2, Exploration Location Map.
Prior to commencement of the fieldwork, Underground Service Alert (USA) was notified and various geophysical techniques were used at the boring locations to identify potential conflicts with subsurface structures. A Kleinfelder staff professional supervised the field operations and logged the explorations. Selected bulk and drive samples were retrieved, placed in plastic bags, or sealed in sample tubes, and transported to our laboratory for further evaluation. The number of blows necessary to drive a Standard Penetration Test (SPT) sampler or California-type sampler was recorded. Soil descriptions used on the logs result from field observations and data, as well as from laboratory test data. Stratification lines on the logs represent the approximate boundary Item: 11
1484
25003229.001A/LH25R178197 Page 3 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
between soil and/or rock types, and the actual transition may vary and can be gradual. Appendix A presents a description of the field exploration program, exploration logs, and a legend of terms and symbols used on the logs.
1.2.3 Task 3 – Laboratory Testing
Laboratory testing was performed on representative bulk and relatively undisturbed samples to assist in soil classification and development of engineering parameters for geotechnical design.
Laboratory testing consisted of moisture content, dry unit weight, wash sieve (percent passing No. 200 sieve), sieve & hydrometer analysis, direct shear, Modified Proctor, R-value, and preliminary corrosion testing. Laboratory testing was performed by both Kleinfelder and AP Engineering and Testing, Inc. of Pomona, California. Appendix B presents the results of the laboratory testing performed for this study.
1.2.4 Task 4 – Geotechnical Analyses
We analyzed field and laboratory data relative to the anticipated finished grades, warehouse layout, and structural loads to provide geotechnical recommendations for design and construction.
We evaluated feasible foundation systems, concrete slab support, pavement design, and earthwork. Seismic design parameters in accordance with the 2022 California Building Code (CBC) are also presented.
1.2.5 Task 5 – Report Preparation
This report summarizes the services performed, data acquired, and our findings, conclusions, and geotechnical recommendations for the design and construction of the proposed improvements.
Our report includes the following items:
• Vicinity map (Figure 1) and field exploration location map (Figure 2) showing the approximate boring and infiltration test locations.
• Boring and infiltration test logs (Appendix A).
• Results of laboratory testing (Appendix B).
• Results of infiltration tests (Appendix C).
• Discussion of general site conditions.
• Discussion of general subsurface conditions as encountered during our field exploration. • Discussion of regional and local geology.
Item: 11
1485
25003229.001A/LH25R178197 Page 4 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
• Recommendations for seismic design parameters in accordance with the 2022 CBC. • Recommendations for foundation design, allowable bearing pressures, embedment depths, and compatibility constraints under various loading conditions. • Anticipated total and differential static settlements. • Recommendations for site preparation, earthwork, temporary slope inclinations, fill placement, and compaction specifications, including the excavation characteristics of subsurface soil deposits and formational materials.
• Recommendations for support of floor slabs and slabs-on-grade. • Recommendations for flexible and rigid pavement structural sections for light- and heavy-duty pavement based on Equivalent Single Axle loading presented in the CWDRs. • Recommendations for design of retaining structures, including active and at-rest lateral earth pressures, passive and frictional resistance, and applicable surcharge loads. • Preliminary evaluation of the corrosion potential of the on-site soils.
Item: 11
1486
25003229.001A/LH25R178197 Page 5 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
2 SITE CONDITIONS
2.1 SITE DESCRIPTION
The proposed Costco site is located southeast of Highway 241 and Alton Parkway at 26602 Towne Centre Drive in Foothill Ranch, California, as shown on Figure 1. The site is currently developed with an existing theatre building, which will be demolished, in the southwest portion of the site surrounded by asphalt surface parking. The existing development is situated on a previously graded pad with 2:1 (horizontal to vertical) descending slopes, up to approximately 30 feet in height, on the western portion of the site.
Item: 11
1487
25003229.001A/LH25R178197 Page 6 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
3 GEOLOGY
3.1 GEOLOGIC SETTING
The project site is located in the northern Peninsular Ranges geomorphic province, a province known for its northwest trending valleys and ranges that are subparallel to the San Andreas and related faults (California Geological Survey (CGS), 2002). More specifically the project site lies along the western flanks of the Santa Ana Mountains. The Santa Ana Mountains are composed of a basement complex of middle Mesozoic-age crystalline and semi-crystalline rocks unconformably overlain by late Cretaceous and Cenozoic clastic strata (Schoellhamer et al., 1981) that were uplifted and folded as a result of movement along the Elsinore Fault and Whittier Fault (Morton and Miller, 2006). The site is bounded by southwest-trending canyons and washes that emerge from the western flanks and deposit young alluvial deposits overlying tertiary-aged strata.
3.1.1 Site Geology
The project site is located in the foothills of the Santa Ana Mountains between Borrego Canyon Wash to the northwest and Serrano Creek to the southeast. Between these drainage areas, the Oso member of the tertiary-aged Capistrano Formation is mapped at the ground surface (Morton and Miller, 2006). Quaternary-aged slope wash (Qsw) is mapped along the perimeter of these exposures and Quaternary-aged alluvium (Qal) overlies the Capistrano Formation in the drainage areas. At the site, the Oso Member of the Capistrano Formation, a white to light gray, massive, fine to coarse grained marine sandstone with scattered gravel underlies up to 9½ feet of artificial fill. According to a historical topographic map from 1949 (U.S. Geological Survey, Department of the Interior, 1949), the ground surface elevation across the site originally exceeded ~790 feet, with the exception of the northwest boundary where the ground surface descended to a local drainage at an elevation of 720 to 740 feet, parallel to the site boundary.
Descriptions of the soils encountered in Kleinfelder’s subsurface exploration are presented in the following sections and on the boring logs presented in Appendix A.
3.2 SUBSURFACE CONDITIONS
The soils encountered within the borings generally consisted of artificial fill overlying sandstone of the Capistrano Formation. Artificial fill associated with previous grading at the site was observed at depths ranging from approximately 4 to 9½ feet bgs. The fill generally consisted of Item: 11
1488
25003229.001A/LH25R178197 Page 7 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
silty to clayey sand with varying amounts of gravel. The deepest fill was observed along the northwest side of the project site. Based on historical topographic maps, the fill may be deepest along the northwest boundary due to a northwest descending slope. Capistrano Formation sandstone was encountered below the fill to the maximum depth explored of approximately 49½ feet bgs. The sandstone was generally highly weathered and excavates as poorly to well graded sand and silty sand.
3.3 GROUNDWATER
Groundwater was not encountered in our borings to the maximum depth explored of approximately 49½ feet bgs. The project site is located within the Southeast Management Area of the Coastal Plain of Orange County Groundwater Basin (Basin 8-1) (OCWD, City of La Habra and IRWD, 2022). This area consists of several small areas southeast of the Orange County Water District Management Area, a portion of which falls within the Irvine Ranch Water District (IRWD) service area. As reported by IRWD, depth to groundwater information is limited to a half dozen production wells, of which only one is active (LF-2). The nearest IRWD well is LF-7, located approximately 1,500 feet to the southwest of the site at an approximate elevation of 832 feet, and showed groundwater at a depth of approximately160 feet below ground surface (El. 672) between 2020 and 2021. Based on a 2024 groundwater report (Montrose Environmental, 2025) for a former Palisades Gas and Wash Station #824 near Portola Parkway and Market Place, depth to groundwater is within approximately 10 to 15 feet of the ground surface (approximate El 802 to 792). Depth to groundwater here may reflect that site’s proximity to local drainages (Borrego Canyon, Serrano Creek) and their tributaries. Based on available groundwater information in the site vicinity and at the site, groundwater is likely to be encountered within approximately 50 to 100 feet of the ground surface. The California Geological Survey does not report a historical high depth to groundwater at the site but reports historical high groundwater of up to 10 feet below ground surface in nearby drainage areas (Pridmore, C.L, 2000).
Groundwater is not anticipated to be encountered within the depth of influence of the foundations or excavations planned for the proposed improvements, however localized zones of perched water, increased soil moisture content and fluctuations of the groundwater level, should be anticipated during and following the rainy season. Irrigation of landscaped areas on or adjacent to the site can also cause a fluctuation of local groundwater levels.
Item: 11
1489
25003229.001A/LH25R178197 Page 8 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
3.4 ASSESSMENT OF POTENTIAL GEOLOGIC HAZARDS
3.4.1 Localized Faulting and Seismicity
The most significant geologic hazard to the project site is considered to be the potential for moderate to strong seismic shaking that is likely to occur during the design life of the project. The project site is located in the highly seismic southern California region within the influence of several fault systems. Based on CGS Special Publication 42 (CGS, 2018) the site is not located within a State-designated Alquist-Priolo (AP) Earthquake Fault Zone (EFZ). The nearest mapped Earthquake Fault Zone is located approximately 11.4 miles northeast of the site along the Glen Ivy Segment of the Elsinore fault (CGS, 2018).
The CGS defines Holocene-active faults as those demonstrated to have displacement of the Holocene-age ground surface within the past 11,700 years (end of the Holocene geologic era) and are believed to pose the risk of ground rupture. Pre-Holocene faults that have been demonstrated to have no Holocene surface displacement are not regulated for fault hazards under the CGS Earthquake Zoning Act. Faults of undetermined age cannot be classified as Holoceneactive or pre-Holocene active because there is insufficient data to demonstrate activity with respect to the Holocene time period. Active faults without surface expression (buried faults) and other potentially active seismic sources which may be capable of generating earthquakes are not currently zoned by the Act, but they are known to be present in the region (e.g. San Joaquin fault).
The Elsinore fault is a right-lateral strike slip fault, that is approximately 185 miles long. The Glen Ivy (fault) segment of the Elsinore Fault, is the segment of the fault nearest to the project site, is approximately 22 miles long (Cao et al., 2003) and is found between Corona and Lake Elsinore.
The estimated slip rate along the Glen Ivy fault is approximately 5 millimeters/year (Dawson and Weldon, 2013). The surface trace of the Elsinore fault has been mapped by the State and designated as an EFZ (CGS, 2003). The surface trace has been mapped approximately 11.4 miles northeast of the project site and the active fault is capable of generating an earthquake of Mw 6.8 (Cao et al., 2003) that could lead to significant ground shaking at the site.
The San Joaquin Hills Blind Thrust Fault is a southwest-dipping (approximately 23 degrees), lowangle reverse (thrust) fault that is concealed (blind) and does not reach the ground surface. Since it is not exposed at the ground surface and does not present a potential for surface fault rupture it is not zoned under the Alquist-Priolo Act as an EFZ. Its trace, at depth, is approximately 4.2 miles southwest of the project site and is an important fault with respect to geologic hazards.
Researchers (Grant et al.,1999 and 2002) hypothesize that local compression caused by a bend Item: 11
1490
25003229.001A/LH25R178197 Page 9 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
in the Newport-Inglewood-Rose Canyon Fault Zone results in uplift of the San Joaquin Hills along the San Joaquin Hills Blind Thrust Fault. Uplift along this fault began in the early Pleistocene and has continued to the present. This fault has a slip rate of 0.2 to 1.0 millimeters/year (Dawson and Weldon, 2013) and is capable of generating a magnitude (Mw) 7.1 earthquake (Petersen et al., 2008). An earthquake occurring along this fault is expected to cause significant ground shaking at the site.
There are several faults within Southern California that are capable of producing large earthquakes. Four major northwest-trending faults divide the Peninsular Ranges province into blocks (Newport-Inglewood-Rose Canyon, Elsinore, San Jacinto and San Andreas). Table 1 below provides the nearest distance to each fault and a listing of some of the seismic parameters (i.e., fault type, slip rate and magnitude) associated with each of the faults.
Table 1
Summary Of Significant Holocene-Active Faults Near the Project Site Fault Name
(segment name)
Approximate
Fault Distance and
Direction from Site
(miles)
Fault Type
Slip
Rate/Year
(mm)
Maximum
Magnitude
(Mmax)
San Joaquin Hills thrust 4.2, southwest Reverse 0.6 7.1 Elsinore (Glen Ivy Fault) 11.4, northeast Right lateral 5 6.9 Elsinore
(all segments combined) 11.4, northeast Right lateral 4.4 7.8 Newport-Inglewood
(Los Angeles Basin) 16.7, west southwest Right lateral strike slip 1 7.1 Newport-Inglewood
Connected alt 1
(all segments combined)
16.7, west southwest Right lateral 1 7.5
San Jacinto
(San Bernardino) 33.9, northeast Right lateral 6 7.1
San Andreas (San
Bernardino Mountains 41.0, northeast Right lateral 19 7.2 Southern San Andreas
(all segments combined) 41.0, northeast Right lateral 34 8.2 Sources:
Dawson, T.E., and R.J. Weldon. 2013. Appendix B – Geologic Slip Rate Data and Geologic Deformation Model in Field, et al., 2013.
Uniform California earthquake rupture forecast, version 3 (UCERF3)—The time-independent model: U.S. Geological Survey (USGS) Open-File Report 2013–1165, and California Geological Survey (CGS) Special Report 228.
All Other data - Petersen, M.D., Frankel, A.D., Harmsen, S.C., Mueller, C.S., Haller, K., Wheeler, R.L., Wesson, R.L., Zeng, Y., Boyd, O.S., Perkins, D.M., Luco, N., Field, E.H., Wills, C.J., and Rukstales, K.S., 2008, Documentation for the 2008 Update of the United States National Seismic Hazard Maps: U.S. Geological Survey (USGS), Open-File Report 2008–1128, 61p.
Item: 11
1491
25003229.001A/LH25R178197 Page 10 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
3.4.2 Landsliding
A landslide results from the downgradient movement of earth material along a slope or hillside.
Landslides occur on slopes when soil and base material lose strength, typically from an increase in pore-water pressures and the forces of gravity, causes the soil and base material to move down-gradient. Landslides can result from a variety or combination of root causes such as steepness of slope, type of material, water content of slope soils, amount and type of vegetation, and major natural hazards such as earthquakes, volcanic eruptions, wildfires, and floods. Steeper slopes and weaker rocks are the most vulnerable to mass wasting events. Landslides can occur as slow but progressive movements of soil over time or from the rapid deterioration of soil on a slope. They are frequently triggered by intense rainfall or seismic shaking.
A portion of the site is located within State-designated Seismic Hazard Zone for Earthquake Induced-Landslides (CGS, 2001). The California Geological Survey and California Department of Conservation Landslide Inventory (beta) online database (2025) shows the same landslide and describes it as a dormant mature/old/relict rock slide that had failed from near to the northwest.
More specifically, the landslide failed from the northwest boundary of the site into a small tributary to Borrego Canyon Wash. According to historical photographs, grading of the site as early as 1994 levelled the site. No evidence of the landslide remains. No evidence of distress was observed at the time of our investigation. The risk from landslides and other forms of mass wasting is considered low due and lack of significant slopes at the site.
3.4.3 Liquefaction and Seismic Compression
The term liquefaction describes a phenomenon in which saturated, cohesionless soils temporarily lose shear strength (liquefy) due to increased pore water pressures induced by strong, cyclic ground motions during an earthquake. Structures founded on or above potentially liquefiable soils may experience bearing capacity failures due to the temporary loss of foundation support, vertical settlements (both total and differential), and/or undergo lateral spreading. The factors known to influence liquefaction potential include soil type, relative density, grain size, confining pressure, depth to groundwater, and the intensity and duration of the seismic ground shaking. Liquefaction is most prevalent in loose to medium dense, silty, sandy, and gravelly soils below the groundwater table.
The site is not located within a State hazard zone for liquefaction (CGS, 2001). Because of the lack of groundwater and the soil types at the site, the potential for liquefaction is not considered a hazard at the site.
Item: 11
1492
25003229.001A/LH25R178197 Page 11 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
Seismic compression results from the accumulation of contractive volumetric strains in unsaturated soil during earthquake shaking. Loose to medium dense granular material with no fines or with low plasticity fines are most susceptible to seismic compression. Based on the density and soil composition of the underlying soils, the potential for seismic compression (dynamic dry settlement) is considered to be very low.
3.4.4 Expansive Soils
Expansive soils are characterized by their ability to undergo significant volume changes (shrink or swell) due to variations in moisture content. Changes in soil moisture content can result from precipitation, landscape irrigation, utility leakage, roof drainage, perched groundwater, drought, or other factors, and may result in unacceptable settlement or heave of structures or concrete slabs supported on grade. The surficial soils are generally silty to clayey sands overlying sandstone. The expansion potential of the near surface soils is considered low.
3.4.5 Flooding
Flooding occurs as a result of several factors in developed areas. These factors are rainfall rates that exceed an area’s ability to absorb or control the runoff, impounded water retained behind a downstream flood control structure (upstream-inundation), failure of an upstream flood control structure (inundation), and tsunami.
The Flood Insurance Rate Map (FEMA, 2019) prepared by the Federal Emergency Management Agency (FEMA) was reviewed to identify the potential flood hazard for the project. This map indicates the site is within Zone X which is defined as being an area determined to be outside the
0.2-percent-annual-chance-flood. Based on this information, the potential for the project site to be impacted by regional flooding is considered low.
Dam inundation occurs when a dam is breached or there is an uncontrolled release of water that may cause flooding downstream. According to the Division of Safety of Dams online database (Division of Safety of Dams, 2025), the project site is not located within a hazard zone for dam inundation.
The site within not located within a tsunami hazard area and the risk of tsunami inundation is considered low (State of California, 2021). Due to the location of the site inland of sea, elevation of the site, and the State of California’s hazard classification outside the area of tsunami hazard, the hazard due to tsunami is considered very low.
Item: 11
1493
25003229.001A/LH25R178197 Page 12 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
A seiche is a wave or sloshing of a body of water that is at least partially impounded caused by strong wind or seismic shaking. The site is not located near a body of water capable of generating a seiche during a seismic event.
3.4.6 Oil and Gas Fields
The project site is not located within a mapped petroleum producing field of Southern California and no oil/gas wells are reported within the Project Site (California Department of Conservation, California Geologic Energy Management Division (CalGEM), 2025). Based on information available from CalGEM, three (3) idle oil and gas wells are within approximately 2.5 to 4.5 miles of the site and several plugged core holes and plugged dry holes are within 1.5 to 2.5 miles of the site. Additional undocumented well(s) may be present and buried near the site.
3.4.7 Land Subsidence
Ground subsidence is a gradual settling or sudden sinking of the earth's surface owing to subsurface movement of earth materials. Ground subsidence results from fluid (water or petroleum) extraction from underlying sediments and/or formations, which causes the collapse of pore spaces previously occupied by the removed fluid. The collapse of these pore spaces compacts the underlying formations leading to a gradual drop in ground surface elevation. Ground subsidence is most often found in areas where large volumetric withdrawals of fluids from underground reservoirs has occurred or is ongoing. Ground shaking from tectonic activity can exacerbate the vertical sinking of land in an area over the withdrawal site. Structures and improvements located in subsidence-prone areas are at risk for damage if subsidence were to occur.
The USGS has been tracking subsidence in California since the early 20th century and has developed maps that illustrate areas of recorded subsidence across the state (USGS, 2021). Most of the subsidence has resulted from excessive groundwater pumping for municipal, industrial, and agricultural uses, although oil extraction is also a documented cause. A review of the USGS subsidence interactive online map shows the project site is not documented to be experiencing subsidence.
Item: 11
1494
25003229.001A/LH25R178197 Page 13 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
4 GEOTECHNICAL DESIGN RECOMMENDATIONS
4.1 GENERAL
Based on the results of our field exploration, laboratory testing, and engineering analyses conducted during this study, it is our professional opinion the proposed project is geotechnically feasible, provided the design and construction recommendations presented in this report are incorporated into the project. We identified the following key geotechnical considerations during our study.
• The proposed Costco warehouse and retaining wall may be supported on a conventional shallow foundation system. Overexcavation and recompaction of the on-site soils is recommended in the upper fill soils within the warehouse building pad to provide relatively uniform support for the proposed warehouse and other improvements. • Light poles may be supported on drilled pile foundations. It should be noted that drilling of the pile shafts may require heavy-duty excavation equipment, and possibly rock coring equipment, to excavate through the Capistrano Formation sandstone. • Soils within 10 feet of the warehouse pad (including the entrance canopy, building aprons, utility pads, stairs, ramps, stoops, and the loading dock) should be overexcavated to a depth of at least 5 feet below existing grade or 3 feet below the bottom of the footings and floor slabs, whichever is deeper, and replaced as structural fill. Depending on the condition of the existing fill at the base of the excavation, additional overexcavation may be required.
The overexcavated soils can be moisture conditioned and recompacted as structural fill. • For pavement, sidewalk, and flatwork areas, we recommend that the exposed subgrade be proof-rolled with heavy construction equipment (e.g. loader or smooth-drum roller) after the area has been stripped of soft earth materials and construction debris to disclose areas of soft and yielding material. Where soft and yielding material is observed, it should be overexcavated and replaced as structural fill. The proof-rolling should extend beyond the proposed improvements a horizontal distance of at least 2 feet, where possible. • For the retaining wall on the west boundary of the site, soils should be overexcavated to a depth of at least 2 feet below existing grade or 2 feet below the bottom of the footing, whichever is deeper. The overexcavated soils can be moisture conditioned and recompacted as structural fill. The overexcavation should extend beyond the proposed improvements a horizontal distance of at least 2 feet.
Item: 11
1495
25003229.001A/LH25R178197 Page 14 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
• Following overexcavation and prior to replacing soils, the exposed subgrade should be proof rolled with at least a 10-ton roller, fully loaded tandem-axle dump truck or water truck. Areas identified as being soft or yielding may require additional compaction or overexcavation, as determined by Kleinfelder. Following proof rolling and any additional overexcavation, the exposed subgrade should be scarified at least 6 to 8 inches, moisture conditioned, and recompacted.
• For earthwork volume estimating purposes, an average shrinkage value of 5 to 10 percent for the upper fill soils (generally in the upper 5 to 6 feet) may be assumed. These values are estimates only and exclude losses due to removal of vegetation or debris. Actual shrinkage/bulking factors will depend on the types of earthmoving equipment used and should be determined during grading. We recommend that the civil engineer or the contractor contact a local earthwork contractor to confirm these values prior to finalizing any earthwork estimates.
• Foundation and slab performance depends greatly on proper irrigation and how well runoff water drains from the site. We recommend that landscape planters either not be located adjacent to structures and pavement areas or be isolated and properly drained to area drains such that cycles of wetting and drying do not impact pavements, flatwork, and other structures. Drought resistant plants and minimum watering are recommended for planters, if used. Planters should be built such that water exiting from them will not seep into the foundation areas or beneath slabs and pavement.
• Minimum resistivity values of the samples tested indicate that the soil may be highly corrosive to ferrous metals. The concentrations of soluble sulfates indicate that the subsurface soils represent a Class S0 Class S0 exposure to sulfate attack on concrete in contact with the soil based on ACI 318-14 Table 19.3.1.1. Therefore, in accordance with ACI Building Code 318-19, no special provisions for selection of cement type are required. • We have assessed the potential for storm water infiltration into the subgrade soils at the subject project site. Four borehole infiltration tests were performed at depths of approximately 5 and 10 feet bgs. Based on the results of our infiltration testing, it is our opinion that the site is not suitable for onsite infiltration. We recommend alternatives to infiltration Best Management Practices (BMPs), such as bio-filtration/bio-retention systems (bio-swales and planter boxes), be implemented at the project site.
The following opinions, conclusions, and recommendations are based on the properties of the materials encountered in the borings and test pits, the results of the laboratory-testing program, Item: 11
1496
25003229.001A/LH25R178197 Page 15 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
and our engineering analyses performed, and should be incorporated into project design and construction.
4.2 SEISMIC DESIGN CONSIDERATIONS
4.2.1 2022 CBC Seismic Design Parameters
Based on information obtained from the investigation, published geologic literature and maps, and on our interpretation of the ASCE/SEI 7-16 criteria, it is our opinion that the project site may be classified as Site Class C, Very Dense Soil/Soft Rock. Approximate coordinates for the site are noted below.
• Latitude: 33.6773 °N
• Longitude: 117.6684 °W
The Risk-Targeted Maximum Considered Earthquake (MCER) mapped spectral accelerations for
0.2 seconds and 1 second periods (Ss and S1) were estimated using the OSHPD seismic design maps web-based application (available at https://seismicmaps.org/). The mapped acceleration values and associated soil amplification factors (Fa and Fv) based on the 2022 CBC (non site-specific) and corresponding site modified spectral accelerations (SMS and SM1) and design spectral accelerations (SDS and SD1) are presented in Table 2.
Item: 11
1497
25003229.001A/LH25R178197 Page 16 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
Table 2
2022 CBC Seismic Design Parameters
DESIGN PARAMETER RECOMMENDED VALUE
Site Class C
Ss (g) 1.289
S1 (g) 0.458
Fa 1.2
Fv 1.5
SMS (g) 1.546
SM1 (g) 0.687
SDS (g) 1.031
SD1 (g) 0.458
PGAM (g) 0.640
4.3 FOUNDATIONS
4.3.1 General
Based on the results of our field exploration, laboratory testing, and geotechnical analyses, the proposed warehouse building and retaining wall may be supported on conventional shallow spread footing foundations founded on subgrade prepared in accordance with Section 5.2.2. Light poles may be supported on drilled pile foundations. It should be noted that drilling of the pile shafts may require heavy-duty excavation equipment, and possibly rock coring equipment, to excavate through the Capistrano Formation sandstone.
Recommendations for the design and construction of shallow foundations and short drilled pile foundations are presented below.
4.3.2 Shallow Foundations
Allowable Soil Bearing Pressure
Footings may be designed for a net allowable soil bearing pressure of 3,000 pounds per square foot (psf) for dead plus sustained live loads. Footings should be embedded at least 18 inches below the lowest adjacent exterior grade. The footing dimension and reinforcement should be Item: 11
1498
25003229.001A/LH25R178197 Page 17 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
designed by the structural engineer; however, continuous and isolated spread footings should have minimum widths of 18 and 24 inches, respectively. A one-third increase in the above bearing pressure can be used for transient wind or seismic loads.
The proposed retaining wall on the west boundary of the site will be adjacent to an existing descending slope. Per Section 1808.7 of the 2022 CBC, footings adjacent to descending slopes steeper than 3:1 (horizontal:vertical) should be established at a depth such that a horizontal setback distance of at least H/3 is maintained between the slope face and the outer bottom edge of the footing, where H is the overall slope height.
Estimated Settlements
We estimate total static settlement of foundations designed and constructed in accordance with the recommendations presented above to be less than 1 inch. Differential static settlement between similarly loaded footings is estimated to be less than ½ inch over 50 feet.
Lateral Resistance
Lateral load resistance may be derived from passive resistance along the vertical sides of the footings, friction acting at the base of the footing, or a combination of the two. An allowable passive resistance of 250 psf per foot of depth may be used for design. Allowable passive resistance values should not exceed 2,500 psf. For the proposed retaining wall on the west boundary of the site, an allowable passive resistance of 150 psf per foot of depth may be used for design and should not exceed 1,500 psf. The allowable passive resistance for the retaining wall footings has been reduced for the descending slope condition adjacent to the wall.
An allowable coefficient of friction of 0.35 between the base of the footings and the engineered fill soils can be used for sliding resistance using the dead load normal stresses. Friction and passive resistance may be combined without reduction. We recommend that the first foot of soil cover be neglected in the passive resistance calculations if the ground surface is not protected from erosion or disturbance by a slab, pavement, or in a similar manner.
4.3.3 Short Drilled Pile Foundations
Axial Capacity
The compressive axial capacity of drilled piles may be estimated based on an allowable skin friction capacity of 200 pounds per square foot. The upper one foot of the skin friction capacity should be ignored. The uplift capacity may be estimated as 70 percent of the allowable Item: 11
1499
25003229.001A/LH25R178197 Page 18 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
compressive axial capacity. A one-third increase in the allowable capacities may be used for transient loading conditions such as wind or seismic loads.
Settlement
Settlement of the proposed canopy supported on drilled piles, as recommended, is estimated to be less than ½ inch. This value does not include elastic compression of the piers under design loads.
Lateral Resistance
The drilled pile foundations lateral resistance can be designed in general accordance with Section 1807.3 of the CBC. We recommend a lateral soil bearing pressure of 250 psf per foot of depth below grade. The lateral soil bearing pressure should not exceed 2,500 psf. Since drilled piles will act as isolated pole foundations, the allowable lateral soil bearing pressure may be increased by a factor of two for short-term lateral loads provided the structure will not be adversely affected by ½ inch of lateral movement at the ground surface.
4.4 BUILDING SLAB-ON-GRADE
Concrete slab-on-grade floors are appropriate for the proposed warehouse, provided subgrade is prepared in accordance with Section 5.2.2. In accordance with the CWDRs, we recommend the slab be a minimum nominal thickness of 6.0 inches and underlain by at least 6.0 inches of aggregate base material. Aggregate base materials should meet current Caltrans specifications for Class 2 aggregate base. Please note that Caltrans Class 2 aggregate base may utilize recycled materials. Costco typically does not allow the use of recycled materials within the building pad. Alternatively, the aggregate base course could meet the specifications for Crushed Aggregate Base (CAB) as defined in Section 200-2 of the current edition of the Standard Specifications for Public Works Construction (Greenbook).
A modulus of subgrade reaction of 150 pounds per cubic inch may be used for design of slabs underlain by 6.0 inches of aggregate base material. Pursuant to current Costco Wholesale standard construction design practices, we have evaluated whether steel reinforcement is needed in the floor slab. Based on the geotechnical characteristics of the site, the proposed warehouse can be built with a non-reinforced slab.
Floor slab control joints should be used to reduce damage due to shrinkage cracking. Control joint spacing is a function of slab thickness, aggregate size, slump and curing conditions. The requirements for concrete slab thickness, joint spacing, and reinforcement should be established Item: 11
1500
25003229.001A/LH25R178197 Page 19 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
by the designer, based on experience, recognized design guidelines and the intended slab use.
Placement and curing conditions will have a strong impact on the final concrete slab integrity.
Kleinfelder typically recommends installation of a vapor barrier beneath the slab to mitigate potential moisture issues such as flooring performance and mold. However, we understand that Costco Wholesale has determined that moisture barriers are not to be used in construction of Costco Wholesale warehouses due to adverse effects on concrete curing and performance.
Therefore, we have provided construction recommendations that do not include installation of a moisture barrier, with the understanding that there will be an increased risk for adverse moisture issues.
4.5 EXTERIOR FLATWORK
Prior to casting exterior flatwork, the subgrade soils should be scarified, moisture conditioned, and recompacted or overexcavated, as recommended in Section 5.2.2. Exterior concrete slabs for pedestrian traffic or landscape outside of the building pad limits should be at least four inches thick. Weakened plane joints in sidewalks should be located at intervals of about 6 feet. Careful control of the water/cement ratio should be performed to avoid shrinkage cracking due to excess water or poor concrete finishing or curing. Unreinforced slabs should not be built in areas where further saturation may occur following construction.
4.6 SITE DRAINAGE
Foundation and slab performance depends greatly on proper irrigation and how well runoff water drains from the site. This drainage should be maintained both during construction and over the entire life of the project. The ground surface around structures should be graded such that water drains away from structures without ponding. The surface gradient needed to do this depends on the landscaping type. Surface gradients should conform to current Costco Wholesale standards and the CBC.
We recommend that landscape planters either not be located adjacent to structures and pavement areas or be isolated and properly drained to area drains such that cycles of wetting and drying do not impact pavements, flatwork, and other structures. Drought resistant plants and minimum watering are recommended for planters, if used. No planters should be installed immediately adjacent to structures unless they are water-proofed and have a drainpipe connected to an area drain outlet. Planters should be built such that water exiting from them will not seep into the foundation areas or beneath slabs and pavement.
Item: 11
1501
25003229.001A/LH25R178197 Page 20 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
Due to poor draining subgrade conditions, we recommend drainage inlets and catch basins include pavement underdrains as shown in Detail 16_16 of the CWDRs. Drains should be designed and constructed per Costco’s standard details and laterals should extend at least 10 feet from the catch basins. Perimeter foundation drains are not necessary.
Where slabs or pavement areas abut landscaped areas, the aggregate base and subgrade soil should be protected against saturation. Vertical cut off structures are recommended to reduce lateral seepage under slabs from adjacent landscaped areas. Vertical cut-off structures may consist of deepened concrete perimeters, or equivalent, extending at least three inches below the base/subgrade interface. Vertical cut-off structures should be poured neat against undisturbed native soil or compacted fill. The cut-off structures should be continuous.
Operations personnel should be instructed to limit irrigation to the minimum level necessary to properly sustain landscaping plants. Should excessive irrigation, waterline breaks or unusually high rainfall occur, saturated zones and “perched” groundwater may develop, which could soften subgrade and reduce pavement life, and could also create potholes. We also recommend that the downspouts from roof drains be connected to a designed subsurface drainage system such as a storm sewer, etc. to avoid discharging water onto pavement areas and backfill zones around the warehouse.
Potential sources of water such as water pipes, drains, and the like should be frequently examined for signs of leakage or damage. Any such leakage or damage should be promptly repaired. Sewer lines beneath the warehouse should have a sufficient slope (at least 1 percent). Plumbing and utility lines should be provided with flexible joints or oversized sleeves where they penetrate floor slabs to prevent breakage caused by differential slab movement. In addition, utility trenches should be plugged with cohesive backfill where they enter the building to reduce moisture infiltration along pipe bedding material. The cohesive backfill materials should have a plasticity index (PI) between 15 and 30 and no less than 70 percent of the particles passing the No. 200 sieve.
4.7 RETAINING STRUCTURES
Design earth pressures for retaining structures depend primarily on the allowable wall movement, wall inclination, type of backfill materials, backfill slopes, surcharges, and drainage. The earth pressures provided assume that granular (sandy) soils will used as backfill. The on-site clayey soils should not be used as retaining wall backfill. Granular backfill, which should meet the requirements for imported fill as defined in Section 5.2.4, should extend behind walls a horizontal Item: 11
1502
25003229.001A/LH25R178197 Page 21 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
distance of at least one-half the height of the wall (a gravel backdrain may be included in this zone). Determination of whether the active or at-rest condition is appropriate for design will depend on the flexibility of the walls. Walls that are free to rotate at least 0.002 radians (deflection at the top of the wall of at least 0.002 x H, where H is the unbalanced wall height) may be designed for the active condition. Walls that are not capable of this movement should be assumed rigid and designed for the at-rest condition. The recommended active and at-rest earth pressures and passive resistance values are provided in Table 3.
Table 3
Lateral Earth Pressures For Retaining Structures
(Granular Backfill)
Wall Movement Backfill Condition Equivalent Fluid
Pressure (pcf)
Seismic Increment
(pcf)
Free to Deflect
(active condition) 40 18*
Restrained
(at-rest condition)
Level
60 N/A**
Note: * Walls supporting more than 6 feet of backfill should be designed to support an incremental seismic lateral pressure, which is applied as a triangular pressure distribution with a maximum pressure at the bottom of the wall, applied similar to the active lateral earth pressure. ** for restrained walls, use the static active earth pressure plus the seismic increment to check the seismic condition; use at-rest earth pressure only to check the static condition; the larger loading of both cases should be used for the design of restrained wall.
The above lateral earth pressures do not include the effects of surcharges (e.g., traffic, footings), compaction, or truck-induced wall pressures. Any surcharge (live, including traffic, or dead load) located within a 1:1 (horizontal to vertical) plane drawn upward from the base of the excavation should be added to the lateral earth pressures. The lateral contribution of a uniform surcharge load located immediately behind walls may be calculated by multiplying the surcharge by 0.33 for cantilevered walls under active conditions and 0.50 for restrained walls under at-rest conditions.
Walls adjacent to areas subject to vehicular traffic should be designed for a 2-foot equivalent soil surcharge (250 psf). Lateral load contributions from other surcharges located behind walls may be provided once the load configurations and layouts are known.
Walls should be properly drained or designed to resist hydrostatic pressures. Adequate drainage is essential to provide a free-drained backfill condition so that there is no hydrostatic buildup behind the wall. Walls should also be appropriately waterproofed to reduce the potential for staining. Drainage behind loading dock walls can consist of weep holes placed along the base of the wall. Weep holes should be spaced 10 to 15 feet apart and connected with a gravel drain consisting of approximately 2 cubic feet of clean gravel per foot of wall length wrapped with filter fabric. Drains should be provided within the loading dock areas to collect both surface water and Item: 11
1503
25003229.001A/LH25R178197 Page 22 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
any seepage from the weep holes. Other types of retaining walls should have a continuous back drain as described below.
For backfill of walls with a continuous back drain, except for the upper 2 feet, the backfill immediately behind retaining walls (minimum horizontal distance of 2 feet measured perpendicular to the wall) should consist of free-draining ¾-inch crushed rock wrapped with filter fabric. The upper 2 feet of cover backfill should consist of relatively impervious material. A 4-inch-diameter perforated PVC pipe, placed perforations down at the bottom of the rock layer leading to a suitable gravity outlet, should be installed at the base of the walls.
As an alternative to the gravel drain noted above, a manufactured drain panel may be utilized behind retaining walls in addition to normal waterproofing. This system generally consists of a prefabricated drain panel lined with filter fabric. At the wall base, we recommend that a gravel drain be installed to collect and discharge drainage to a suitable outlet. The drain should consist of a 4-inch-diameter perforated PVC pipe, placed perforations down at the bottom of approximately 2 cubic feet of clean gravel per foot of wall length. The gravel drain should be wrapped in filter fabric (Mirafi 140N or equivalent). The pipe should be sloped to drain to a suitable outlet and cleanouts should be provided at appropriate intervals.
If drainage behind the wall is omitted, the wall should be designed for full hydrostatic pressure.
The design of any drain system should be submitted to Kleinfelder for review to check that our recommendations have been properly incorporated into the design. Installation of the drainage system should be reviewed and documented by a Kleinfelder representative.
4.8 PAVEMENT SECTIONS
The required pavement structural sections will depend on the expected wheel loads, volume of traffic, and subgrade soils. We have provided asphalt concrete pavement sections for traffic indices provided in the CWDRs (Costco, 2022). Positive drainage of the paved areas should be provided since moisture infiltration into the subgrade may decrease the life of pavements. Curbing located adjacent to paved areas should be founded in the subgrade, not the aggregate base, in order to provide a cutoff, which reduces water infiltration into the base course.
The following pavement sections provided above are based on the soil conditions encountered during our field exploration, our assumptions regarding final site grades, and limited laboratory testing.
Item: 11
1504
25003229.001A/LH25R178197 Page 23 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
4.8.1 Costco Pavement Design Parameters
We developed pavement design recommendations using traffic loading parameters provided in the Costco Wholesale Development Requirements and the following test data:
• A 20-year pavement design life.
• Light-duty pavements subject to 6,600 passenger vehicle trips per day (Traffic Index of
5.0).
• Heavy-duty pavements subject to 30 tractor-trailer truck tips per day (Traffic Index of 7.0). • For asphalt concrete pavements, a design R-value of 15 based on laboratory testing and engineering judgement.
• For Portland cement concrete (PCC) Pavements, a 28-day flexural strength (modulus of rupture determined by the third-point method) of at least 550 pounds per square inch (psi) (approximate compressive strength of 4,000 psi); a modulus of subgrade reaction (k value) of 100 pounds per cubic inch (pci) for native subgrade; and interlock at the control joints.
4.8.2 Asphalt Concrete Pavement
We designed asphalt concrete pavement, also referred to as Hot Mix Asphalt (HMA), in general accordance with the Caltrans Highway Design Manual (2022), which is the current design practice in California. Table 4 presents the asphalt concrete pavement sections for the noted traffic indices.
The designer should select the appropriate pavement sections based on projects requirements.
Prior to placement of aggregate base, pavement subgrade should be prepared in accordance with Section 5.2.2.
Table 4
Recommended Minimum Asphalt Concrete Pavement Sections
Traffic Use Traffic Index, TI Design Method
Asphalt
Concrete*
(inches)
Aggregate Base*
(inches)
Light-Duty
Pavement 5.0 Caltrans 4.0 6.0
Heavy-Duty
Pavement 7.0 Caltrans 5.0 11.5
* Rounded to the closest ½ inch.
Item: 11
1505
25003229.001A/LH25R178197 Page 24 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
4.8.3 Asphalt Performance Grade Binder
An asphalt performance grade (PG) binder of 64-10 should be used for the project and is locally available. This recommendation was developed in accordance with Costco Wholesale Asphalt Paving Specification Section 321216. Air temperature data nearest the project site was used with the MERRA Climate Data option and the PG binder was selected using the FHWA program LTTPBind Online web-based tool based on the AASHTO M323-13 standard. The high-end and low-end temperature rating was selected to provide a reliability of at least 98 and 90 percent, respectively.
4.8.4 Portland Cement Concrete Pavement
We designed PCC pavement in accordance with the Portland Cement Association (PCA) Thickness Design for Concrete Pavements (PCA, 1984) using the design parameters stated above. For heavy-duty pavements, we recommend that PCC pavement section should be comprised of 7.0 inches of PCC with 6.0 inches of aggregate base. We understand that Costco is considering paving the American Disability Act (ADA) access area in front of the main entry with PCC pavement. For ADA access area, we recommend that PCC pavement section should be comprised of 6.0 inches of PCC with 6.0 inches of aggregate base to match the building pad flatwork. Prior to placement of aggregate base, pavement subgrade should be prepared in accordance with Section 5.2.2.
Longitudinal and transverse joint spacing should not exceed 12 feet and 15 feet, respectively.
Joint details should conform to PCA guidelines. Expansion joints in concrete slabs should be sealed with petroleum resistant sealant to prevent minor releases from impacting subsurface soil.
4.8.5 Aggregate Base
Aggregate base materials should meet current Caltrans specifications for Class 2 aggregate base.
4.8.6 Pavement Maintenance
Pavements may undergo movement due to changes in subgrade moisture content. This movement tends to accelerate pavement deterioration. A crack sealing program should be performed annually to slow pavement deterioration. Any areas where surface water stands on the surface should be remediated. Over time, as cracking becomes more pronounced, a slurry seal coat should be applied.
Item: 11
1506
25003229.001A/LH25R178197 Page 25 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
4.9 SOIL CORROSIVITY
We performed laboratory testing for parameters commonly used to evaluate corrosivity of soils, including pH, minimum resistivity, chloride and soluble sulfate content. Table 5 presents the results.
Table 5
Corrosion Test Results
Location Depth
(ft)
Minimum
Resistivity
(ohm-cm)
pH
Soluble
Sulfate
Content
(ppm)
Soluble
Chloride
Content
(ppm)
B-2 0-5 2,767 8.0 37 6
B-11 0-5 3,147 8.0 8 4
B-16 0-5 1,907 8.4 119 12
B-27 0-5 2,048 8.7 101 9
These tests are a generalized indicator of soil corrosivity for the samples tested. Other soils on site may be more, less, or similarly corrosive in nature. Imported fill materials should be tested to confirm that their corrosion potential is not more severe than those noted.
Although Kleinfelder does not practice corrosion engineering, resistivity values between 1,000 and 3,000 ohm-cm are normally considered highly corrosive to buried ferrous metals (Roberge, 2006). The concentrations of soluble sulfates indicate that the subsurface soils represent a Class S0 Class S0 exposure to sulfate attack on concrete in contact with the soil based on ACI 318-19 Table 19.3.1.1. Therefore, in accordance with ACI Building Code 318-19, no special provisions for selection of cement type are required.
4.10 STORMWATER MANAGEMENT
We understand that as part of the storm water management for the project, Infiltration Best Management Practices (BMPs), are being considered. We performed four (4) borehole percolation tests in general accordance with Appendix VII of the Orange County Technical Guidance Document for Preparation of Conceptual/Preliminary and/or Project Water Quality Management Plans, dated December 20, 2013. We also performed sieve analysis and hydrometer testing to assess the grain-size characteristics of the onsite soils. The results of the laboratory testing and infiltration testing results are attached in Appendix B and C, respectively.
Item: 11
1507
25003229.001A/LH25R178197 Page 26 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
Based on visual soil classification and laboratory testing of the soil samples collected during our field exploration, the near-surface soils generally consist of artificial fill comprised of silty to clayey sand overlying Capistrano Formation sandstone. The fines content of the infiltration test samples tested during our field exploration ranged from approximately 8 to 20 percent based on laboratory testing of the near surface soils. Table 6 summarizes the tested (in-situ) infiltration rates and the long-term design infiltration rates for each test location.
Table 6
Summary of Infiltration Test Results
Test
Location
Approximate Test Depth
(feet bgs)
Tested Infiltration Rate
(inches per hour)
Design Infiltration Rate
(inches per hour)1
INF-1 3 – 5 0.3 0.07
INF-2 8 – 10 0.1 0.02
INF-3 3 – 5 0.1 0.02
INF-4 8 – 10 0.1 0.02
Notes: 1Design Infiltration Rate determined using a combined factor of safety of 4.4, as recommended in Worksheet H: Factor of Safety and Design Infiltration Rate and Worksheet in the Orange County Technical Guidance Document for Preparation of Conceptual/Preliminary and/or Project Water Quality Management Plans, dated December 20, 2013.
Based on the results of the infiltration testing and laboratory testing, it is our opinion that the site is not considered suitable for infiltration BMPs in the subsurface soils as shown by the infiltration rates provided in Table 6. We recommend alternatives to infiltration Best Management Practices (BMPs), such as bio-filtration/bio-retention systems (bio-swales and planter boxes), be implemented at the warehouse site. If bio-filtration/bio-retention systems are employed, we recommend that the BMPs be built such that water exiting from them will not seep into the foundation areas or beneath slabs and pavement. If planters are located within 10 feet of the building or building foundations, or adjacent to slabs and pavements, then some means of diverting water away from the building, building foundation soils, or soils that support slabs and pavements would be required, such as lining the planters.
Item: 11
1508
25003229.001A/LH25R178197 Page 27 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
5 CONSTRUCTION RECOMMENDATIONS
5.1 GENERAL
The following recommendations should be used by the contractor for construction of the project.
5.2 EARTHWORK
5.2.1 General
Site preparation and earthwork operations should be performed in accordance with applicable codes, safety regulations and other local, state or federal specifications, and the recommendations included in this report. References to maximum dry unit weights are established in accordance with the latest version of ASTM Test Method D1557 (modified Proctor).
The earthwork operations should be observed and tested by a representative of Kleinfelder.
5.2.2 Site Preparation
Abandoned utilities and other existing features within the proposed development areas (if any are encountered) should be removed and the excavation(s) backfilled with engineered fill. Debris produced by demolition operations, including wood, steel, piping, plastics, etc., should be separated and disposed of off-site. Existing utility pipelines or conduits that extend beyond the limits of the proposed construction and are to be abandoned in place, should be plugged with non-shrink cement grout to prevent migration of soil and/or water. Demolition, disposal, and grading operations should be observed and tested by a representative of Kleinfelder.
Soils within 10 feet of the warehouse pad (including the entrance canopy, building aprons, utility pads, stairs, ramps, stoops, and the loading dock) should be overexcavated to a depth of at least 5 feet below existing grade or 3 feet below the bottom of the footings and floor slabs, whichever is deeper, and replaced as structural fill. Depending on the condition of the fill at the base of the excavation, additional overexcavation may be required. The overexcavated soils can be moisture conditioned and recompacted as structural fill. Following overexcavation and prior to replacing soils, the exposed subgrade should be proof-rolled with heavy construction equipment (e.g., with a fully-loaded tandem-axle dump truck or water truck). Areas identified as being soft or yielding may require additional compaction or overexcavation as determined by Kleinfelder.
For pavement, sidewalk, and other flatwork areas, we recommend that the exposed subgrade be proof-rolled with heavy construction equipment (e.g. loader or smooth-drum roller) after the area Item: 11
1509
25003229.001A/LH25R178197 Page 28 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
has been stripped of soft earth materials and construction debris to disclose areas of soft and yielding material. Where soft and yielding material is observed, it should be overexcavated and replaced as structural fill. The proof-rolling should extend beyond the proposed improvements a horizontal distance of at least 2 feet, where possible.
For the retaining wall on the west boundary of the site, soils should be overexcavated to a depth of at least 2 feet below existing grade or 2 feet below the bottom of the footing, whichever is deeper. The overexcavated soils can be moisture conditioned and recompacted as structural fill.
The overexcavation should extend beyond the proposed improvements a horizontal distance of at least 2 feet.
Following overexcavation and prior to replacing soils, the exposed subgrade should be proof rolled with at least a 10-ton roller, fully loaded tandem-axle dump truck or water truck. Areas identified as being soft or yielding may require additional compaction or overexcavation as determined by Kleinfelder. Following proof rolling and any additional overexcavation, the exposed subgrade should be scarified at least 6 to 8 inches, moisture conditioned, and recompacted.
5.2.3 Foundation Excavations
Shallow Foundations
Following excavation to the foundation subgrade elevations, the exposed subgrade should be observed by a representative of the geotechnical engineer to evaluate the presence of satisfactory materials at design elevations. If unsatisfactory material, such as soft or disturbed soil, debris or otherwise unsuitable soil is present at the base of footing excavations, it should be overexcavated and replaced with structural concrete, 2-sack sand-cement slurry, or structural fill to the depth determined by the geotechnical engineer.
Drilled Pile Foundations
The performance and capacities of piles can be influenced significantly by the selected construction methods and procedures used. Construction methods that create large zones of disturbance around the drilled shafts can lead to lower than expected skin friction due to excessive stress relief around the shaft length. Drilling of the pile shafts should be accomplished using conventional heavy-duty excavation equipment maintained in good condition. However, drilling of the pile shafts may require heavy-duty excavation equipment, and possibly rock coring equipment, to excavate through the Capistrano Formation sandstone.
Item: 11
1510
25003229.001A/LH25R178197 Page 29 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
Caving of the pile shafts could occur in non-cohesive sandy layers. Temporary steel casing may be required to stabilize the sides of the pile shaft. Concrete should be placed immediately after drilling of the hole is complete. The concrete should be pumped to the bottom of the drilled shaft using a down-hole tremie. If the tremie method is used to place concrete below the water level, we recommend it have a slump of at least 8 inches. If steel casing is used, the casing should be removed as the concrete is placed but the bottom of the casing should be kept at least 5 feet below the top of the concrete.
5.2.4 Fill Material and Compaction Criteria
The on-site soils, minus debris, organic matter, or other deleterious materials may be used as structural fill. Rock or other soil fragments greater than 3 inches in size should not be used in the fills.
Import soils, if needed, should have no particles greater than 3 inches in maximum dimension, no less than 70 percent of the particles passing the No. 4 sieve, no more than 30 percent of particles passing the No. 200 sieve, and a Plasticity Index (PI) less than 5. The contractor should provide documentation that all imported soil is free of hazardous materials, including petroleum or petroleum byproducts, chemicals and harmful minerals. Test results with the geotechnical and analytical properties of the proposed import material should be provided to Costco for approval prior to transportation and use on site.
Soils should be compacted to at least 95 percent of the maximum dry unit weight (ASTM D1557) in accordance with the Costco Wholesale Development Requirements (CWDRs). Fill should be placed in loose horizontal lifts not more than 8 inches thick (loose measurement). The moisture content of the fill should be maintained at within 2 percent of optimum during compaction.
Processing may require ripping the material, disking to break up clumps, and blending to attain uniform moisture contents necessary for compaction. Utility trench backfill should be mechanically compacted. Flooding should not be permitted. Table 7 presents structural fill placement and compaction criteria.
Item: 11
1511
25003229.001A/LH25R178197 Page 30 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
Table 7
Structural Fill Placement And Compaction Criteria
Fill Location/Use Material
Type
Relative Compaction1
(ASTM D1557)
Moisture
Content
Range
Minimum
Compaction
Testing Frequency
Per Lift
Aggregate Base
Course for
Pavements and
Concrete Slabs
Aggregate
Base At least 95 percent -2 to +2%of optimum 10,000 Square Feet Structural Areas
(Warehouse
Building Pad)
On-site Soils
or Imported
Material
At least 95 percent -2 to +2%
of optimum 10,000 Square Feet
Subgrade for
Pavements,
Sidewalks and
Other Flatwork
Areas
On-site Soils
or Imported
Material
At least 95 percent -2 to +2%
of optimum 15,000 Square Feet
Retaining Wall
Backfill
On-site
Granular
Soils or
Imported
Material
At least 92 percent -2 to +2%
of optimum 1,000 Square Feet
Utility Trenches
Backfill
On-site Soils
or Imported
Material
At least 95 percent -2 to +2%
of optimum 150 Linear Feet
Lawns or
Unimproved Areas
On-site Soils
or Imported
Material
At least 90 percent At least
optimum 20,000 Square Feet
Note: 1 Where two or more compaction specifications coincide, the more stringent specification should be utilized.
5.2.5 Shrinkage/Bulking
For earthwork volume estimating purposes, an average shrinkage value of 5 to 10 percent for the upper fill soils (generally in the upper 5 to 6 feet) may be assumed. These values are estimates only and exclude losses due to removal of vegetation or debris. Actual shrinkage/bulking factors will depend on the types of earthmoving equipment used and should be determined during grading. We recommend that the civil engineer or the contractor contact a local earthwork contractor to confirm these values prior to finalizing any earthwork estimates.
5.2.6 Excavation Characteristics
The subsurface conditions consist predominantly of artificial fill overlying Capistrano Formation sandstone. Refusal was not encountered in any of the borings drilled to a maximum depth of approximately 49½ feet bgs. The excavations for foundations, utility trenches and general site grading should be excavatable with conventional heavy-duty construction equipment maintained Item: 11
1512
25003229.001A/LH25R178197 Page 31 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
in good condition; however, localized cemented zones may require more aggressive means of excavation such as a large hydraulic excavator equipped with either a rock ripping attachment or a pneumatic hammer to break up and excavate the bedrock. The contractor should consider these soil conditions in determining the equipment required for the on-site excavations. In addition, oversized materials, such as rock fragments or cobbles, should be anticipated. Oversize material larger than 3 inches in diameter should be removed and disposed of off-site. Caving of the sidewalls during excavation in the sandy soil may occur depending on conditions at the time of excavation and should be anticipated by the contractor.
5.2.7 Temporary Excavations
All excavations must comply with applicable local, state, and federal safety regulations, including OSHA requirements. The responsibility for excavation safety and stability of temporary construction slopes lies solely with the contractor. We are providing this information below solely as a service to our client. Under no circumstances should this information provided be interpreted to mean that Kleinfelder is assuming responsibility for final engineering of excavations or shoring, construction site safety, or the contractors’ activities; such responsibility is not being implied and should not be inferred.
Minor sloughing and/or raveling of slopes should be anticipated as they dry out. Where space for sloped embankments is not available, shoring will be necessary. In addition, excavations within a 1:1 plane extending downward from a horizontal distance of 2 feet beyond the bottom outer edge of existing improvements should not be attempted without bracing and/or underpinning the footings, as discussed above. The geotechnical engineer or their field representative should observe the excavations so that modifications can be made to the excavations, as necessary, based on variations in the encountered soil conditions. All applicable excavation safety requirements and regulations, including OSHA requirements, should be met.
Vertical or steeply sided trench excavations should not be attempted without proper shoring or bracing. All trench excavations should be braced and shored in accordance with good construction practice and all applicable safety ordinances and codes. Stockpiled (excavated) materials should be placed no closer to the edge of an excavation than a distance equal to the depth of the excavation, but no closer than 4 feet.
5.2.8 Trench Backfill
Pipe zone backfill (i.e. material beneath and in the immediate vicinity of the pipe) should consist of imported soil less than ¾-inch in maximum dimension. Trench zone backfill (i.e., material Item: 11
1513
25003229.001A/LH25R178197 Page 32 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
placed between the pipe zone backfill and finished subgrade) may consist of onsite soil or imported fill that meets the requirements for engineered fill provided above.
If imported material is used for trench zone backfill, we recommend it consist of silty sand. In general, gravel should not be used for trench zone backfill due to the potential for soil migration into the relatively large void spaces present in this type of material and for water seepage along trenches backfilled with coarse-grained sand and/or gravel.
Recommendations provided above for pipe zone backfill are minimum requirements only. More stringent material specifications may be required to fulfill local building requirements and/or bedding requirements for specific types of pipes. We recommend the project civil engineer develop these material specifications based on planned pipe types, bedding conditions, and other factors beyond the scope of this study.
Trench backfill should be placed and compacted in accordance with recommendations provided for engineered fill in Section 5.2.4. Mechanical compaction is recommended; ponding or jetting should be avoided, especially in areas supporting structural loads or beneath concrete slabs supported on grade, pavements, or other improvements.
5.3 UNSTABLE SUBGRADE CONDITIONS
Should grading be performed during or following extended periods of rainfall, the moisture content of the near-surface soils may be significantly above the optimum moisture content. These conditions could seriously impede grading by causing an unstable subgrade condition. Typical remedial measures for the site conditions include the following. • Drying: Drying unstable subgrade involves disking or ripping wet subgrade to a depth of approximately 18 to 24 inches and allowing the exposed soil to dry. Multiple passes of the equipment (likely on a daily basis) will be needed because as the surface of the soil dries, a crust forms that reduces further evaporation. Frequent disking will help prevent the formation of a crust and will promote drying. This process could take several days to several weeks depending on the material, the depth of ripping, the number of passes, and the weather.
• Removal and Replacement with Crushed Rock and Geotextile Fabric: Unstable subgrade could be overexcavated 12 to 24 inches below existing grade and replaced with ¾- or 1-inch crushed rock underlain by geotextile fabric. The geotextile fabric should consist of a woven geotextile, such as Mirafi HP series or equivalent. The final depth of removal will Item: 11
1514
25003229.001A/LH25R178197 Page 33 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
depend upon the conditions observed in the field once overexcavation begins. The geotextile fabric should be placed in accordance with the manufacturer’s recommendations.
• Cement Treatment: For larger areas, unstable subgrade could be stabilized by mixing the upper 12 to18 inches of the subgrade with Portland cement. For estimating purposes, an application rate of 4 to 5 percent Portland cement may be used. Final application rates should be determined in the field at the time of construction in consultation with the geotechnical engineer. Cement treatment should be performed by a specialty contractor experienced in this work. Since soil treatment uses the on-site soil, the expense of importing material can be avoided.
5.4 TEMPORARY SHORING
Temporary shoring may be required in areas adjacent to existing structures or improvements where excavations cannot be adequately sloped. Temporary shoring may consist of a turn-key shoring system, soldier piles and lagging, or other system. Recommendations for design of temporary shoring are presented below.
The shoring design should be provided by a civil engineer registered in the State of California and experienced in the design and construction of shoring under similar conditions. Once the final excavation and shoring plans are complete, the plans and design should be reviewed by Kleinfelder for conformance with the design intent and geotechnical recommendations provided herein.
5.4.1 Lateral Pressures
For the design of cantilevered shoring, an equivalent fluid pressure of 40 pounds per cubic foot (pcf) may be used for level backfill. Where the surface of the retained earth slopes up away from the shoring, a greater pressure should be used. Design data can be developed for additional cases when the design conditions are established.
In addition to the recommended earth pressure, any surcharge (live, including traffic, or dead load) located within a 1:1 plane drawn upward from the base of the shored excavation should be added to the lateral earth pressures. The lateral contribution of a uniform surcharge load located immediately behind the wall may be calculated by multiplying the surcharge by 0.33 for the level backfill condition. Lateral load contributions of surcharges located at a distance behind the shored wall may be provided once the load configurations and layouts are known. As a minimum, a 2- Item: 11
1515
25003229.001A/LH25R178197 Page 34 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
foot equivalent soil surcharge (250 psf) is recommended to account for nominal construction loads. It should be noted that the above pressures do not include hydrostatic pressure and assume groundwater will not be encountered in the excavation, or dewatering will be used to lower the ground water table below the bottom of the excavation.
5.4.2 Design of Soldier Piles
All soldier piles should extend to a sufficient depth below the excavation bottom to provide the required lateral resistance. We recommend the required embedment depths be calculated based on the principles of force and moment equilibrium. For this method, the allowable passive pressure against soldier piles that extend below the level of excavation may be assumed to be equivalent to a fluid pressure of 250 pcf. The maximum lateral resistance value should not exceed 2,500 psf. To account for arching, the passive resistance may be assumed to act over a width 2.5 times the width of the embedded portion of the pile, provided adjacent piles are spaced at least
3.0 pile diameters, center-to-center.
Drilling of the soldier pile shafts could be accomplished using heavy-duty drilling equipment. The on-site soils below the base of the excavation are sandy and caving of the pile shafts could occur.
Temporary steel casing may be required to stabilize the sides of the pile shaft. Concrete for piles should be placed immediately after the drilling of the hole is complete. The concrete should be pumped to the bottom of the drilled shaft using a tremie. Once concrete pumping is initiated, a minimum head of 5 feet of concrete above the bottom of the tremie should be established and maintained throughout the concrete placement to prevent contamination of the concrete by soil inclusions. If steel casing is used, the casing should be removed as the concrete is placed.
To develop full lateral resistance, provisions should be taken to assure firm contact between the soldier piles and undisturbed materials. The concrete placed in the soldier pile excavations may be a lean-mix concrete. However, the concrete used in that portion of the soldier pile that is below the planned excavated level should provide sufficient strength to adequately transfer the imposed loads to the surrounding materials.
5.4.3 Lagging
Continuous treated timber lagging should be used between the soldier piles. The lagging should be installed as the excavation proceeds. If treated timber is used, the lagging may remain in place after backfilling. The lagging should be designed for the recommended earth pressure but limited to a maximum value of 400 psf.
Item: 11
1516
25003229.001A/LH25R178197 Page 35 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
5.4.4 Deflection
Shoring adjacent to existing structures or improvements should be designed and constructed to reduce potential movement. The shoring system designer should evaluate potential deflections in their design.
5.4.5 Monitoring
Some deflection of the shored excavation should be anticipated during the planned excavation.
We recommend the project civil engineer perform a survey of all existing utilities and structures adjacent to the shored excavation. The purpose of this survey would be to evaluate the ability of existing utility lines or improvements to withstand horizontal movements associated with a shored excavation and to establish the baseline condition in case of unfounded claims of damage. If existing improvements are not capable of withstanding anticipated lateral movements, alternative shoring systems may be required.
Horizontal and vertical movements of the shoring system should be monitored by a licensed surveyor. The construction monitoring and performance of the shoring system are ultimately the contractor’s responsibility. However, at a minimum, we recommend that the top of shoring be surveyed prior to excavation and that the top and bottom of the soldier beams be surveyed on a weekly basis until the shoring is not needed. Surveying should consist of measuring movements in vertical and two perpendicular horizontal directions.
5.5 EXTERIOR FLATWORK
Prior to casting exterior flatwork, the existing soils should be overexcavated and subgrade soils should be scarified, moisture conditioned, and recompacted as recommended in Section 5.2.2.
The moisture content of the finished subgrade soils should be maintained around optimum prior to the placement of any flatwork or structural fill. Careful control of the water/cement ratio should be performed to avoid shrinkage cracking due to excess water or poor concrete finishing or curing.
5.6 PAVEMENTS
5.6.1 HMA Design
Hot Mix Asphalt (HMA) should conform to requirements of the Costco Wholesale Specification Section 321216, Asphalt Paving. Section 1.3.C of the HMA specification requires that the HMA section be placed in at least two lifts. The HMA specification allows the use of ½- or ¾-inch Nominal Maximum Aggregate Size (NMAS) mixes for the base course and ⅜- or ½-inch NMAS Item: 11
1517
25003229.001A/LH25R178197 Page 36 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
mixes for surface course. Maximum and minimum HMA compacted lift thicknesses are provided in Table 3.1 in Section 3.3.B of the HMA specification.
5.6.2 Construction Considerations
The pavement sections provided above are contingent on the following recommendations being implemented during construction.
• Pavement subgrade should be prepared as recommended in Section 5.2.2. • Subgrade soils should be in a stable, non-pumping condition at the time the aggregate base materials are placed and compacted.
• Aggregate base materials should be compacted to at least 95 percent relative compaction (ASTM D1557).
• Asphalt paving materials and placement methods should meet current Costco Wholesale Specifications Section 321216.
• Adequate drainage (both surface and subsurface) should be provided such that the subgrade soils and aggregate base materials are not allowed to become wet.
Note that pavement materials and construction must be completed in strict accordance with the Costco’s specifications that contain very specific pavement material (asphalt, aggregate and concrete) criteria and construction practices to be used (compaction and material sampling). The general contractor and pavement construction subcontractor should be aware that asphalt and concrete mix designs must be submitted to the design architect and Kleinfelder at least 45 days prior to the scheduled production and laydown for review and approval.
Item: 11
1518
25003229.001A/LH25R178197 Page 37 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
6 ADDITIONAL SERVICES
6.1 PLANS AND SPECIFICATIONS REVIEW
We recommend Kleinfelder perform a review of geotechnical-related portions of the project plans and specifications before they are finalized to see that geotechnical recommendations have been properly interpreted and implemented during design. If we are not accorded the privilege of performing this review, we can assume no responsibility for misinterpretation of our recommendations.
6.2 CONSTRUCTION OBSERVATION AND TESTING
The construction process is an integral design component with respect to the geotechnical aspects of a project. Because geotechnical engineering is an inexact science due to the variability of natural processes, and because we sample only a limited portion of the soils affecting the performance of the proposed structure, unanticipated or changed conditions can be encountered during grading. Proper geotechnical observation and testing during construction are imperative to allow the geotechnical engineer the opportunity to verify assumptions made during the design process. Therefore, we recommend that Kleinfelder be retained during the construction of the proposed improvements to observe compliance with the design concepts and geotechnical recommendations, and to allow design changes in the event that subsurface conditions or methods of construction differ from those assumed while completing this study.
Our services are typically needed at the following stages of grading:
• After demolition;
• During grading;
• During the installation of temporary construction shoring; • After the overexcavation, but prior to subgrade preparation; • During utility trench backfill;
• During fill placement of wall backfill;
• During base placement and site paving; and
• After excavation for foundations.
Item: 11
1519
25003229.001A/LH25R178197 Page 38 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
7 LIMITATIONS
This geotechnical study has been prepared for the exclusive use of Costco Wholesale and their agents for specific application to the proposed Costco Wholesale Warehouse (CW# 24-1218) located at 26602 Towne Centre Drive in Foothill Ranch, California. The findings, conclusions, and recommendations presented in this report were prepared in accordance with generally accepted geotechnical engineering practice. No other warranty, express or implied, is made.
The scope of services was limited to a background data review and the field exploration described in Section 1.2. It should be recognized that definition and evaluation of subsurface conditions are difficult. Judgments leading to conclusions and recommendations are generally made with incomplete knowledge of the subsurface conditions present due to the limitations of data from field studies. The conclusions of this assessment are based on our field exploration and laboratory testing programs, and engineering analyses.
Kleinfelder offers various levels of investigative and engineering services to suit the varying needs of different clients. Although risk can never be eliminated, more detailed and extensive studies yield more information, which may help understand and manage the level of risk. Since detailed study and analysis involves greater expense, our clients participate in determining levels of service, which provide information for their purposes at acceptable levels of risk. The client and key members of the design team should discuss the issues covered in this report with Kleinfelder, so that the issues are understood and applied in a manner consistent with the owner’s budget, tolerance of risk and expectations for future performance and maintenance.
Recommendations contained in this report are based on our field observations and subsurface explorations, limited laboratory tests, and our present knowledge of the proposed construction. It is possible that soil or groundwater conditions could vary between or beyond the points explored. If soil or groundwater conditions are encountered during construction that differ from those described herein, the client is responsible for ensuring that Kleinfelder is notified immediately so that we may reevaluate the recommendations of this report. If the scope of the proposed construction, including the estimated Traffic Index or locations of the improvements, changes from that described in this report, the conclusions and recommendations contained in this report are not considered valid until the changes are reviewed, and the conclusions of this report are modified or approved in writing, by Kleinfelder.
Item: 11
1520
25003229.001A/LH25R178197 Page 39 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
The scope of services for this subsurface exploration and geotechnical report did not include environmental assessments or evaluations regarding the presence or absence of wetlands or hazardous substances in the soil, surface water, or groundwater at this site.
Kleinfelder cannot be responsible for interpretation by others of this report or the conditions encountered in the field. Kleinfelder must be retained so that all geotechnical aspects of construction will be monitored on a full-time basis by a representative from Kleinfelder, including site preparation, preparation of foundations, and placement of engineered fill and trench backfill. These services provide Kleinfelder the opportunity to observe the actual soil and groundwater conditions encountered during construction and to evaluate the applicability of the recommendations presented in this report to the site conditions. If Kleinfelder is not retained to provide these services, we will cease to be the engineer of record for this project and will assume no responsibility for any potential claim during or after construction on this project. If changed site conditions affect the recommendations presented herein, Kleinfelder must also be retained to perform a supplemental evaluation and to issue a revision to our original report.
This report, and any future addenda or reports regarding this site, may be made available to bidders to supply them with only the data contained in the report regarding subsurface conditions and laboratory test results at the point and time noted. Bidders may not rely on interpretations, opinion, recommendations, or conclusions contained in the report. Because of the limited nature of any subsurface study, the contractor may encounter conditions during construction which differ from those presented in this report. In such event, the contractor should promptly notify the owner so that Kleinfelder’s geotechnical engineer can be contacted to confirm those conditions. We recommend the contractor describe the nature and extent of the differing conditions in writing and that the construction contract include provisions for dealing with differing conditions. Contingency funds should be reserved for potential problems during earthwork and foundation construction.
This report may be used only by the client and only for the purposes stated, within a reasonable time from its issuance, but in no event later than one year from the date of the report. Land use, site conditions (both on site and off site) or other factors may change over time, and additional work may be required with the passage of time. Any party, other than the client who wishes to use this report shall notify Kleinfelder of such intended use. Based on the intended use of this report and the nature of the new project, Kleinfelder may require that additional work be performed and that an updated report be issued. Non-compliance with any of these requirements by the client or anyone else will release Kleinfelder from any liability resulting from the use of this report by any unauthorized party and the client agrees to defend, indemnify, and hold harmless Kleinfelder from any claims or liability associated with such unauthorized use or non-compliance.
Item: 11
1521
25003229.001A/LH25R178197 Page 40 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
8 REFERENCES
American Concrete Institute (ACI), 2019. Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI318-19R).
American Society of Civil Engineers (ASCE), 2016, Minimum Design Load for Buildings and Other Structures (ASCE/SEI 7-16) with ASCE Supplement 1, 2, and 3.
California Department of Conservation, Geologic Energy Management Division (CalGEM), 2024, Well Finder, Well Finder (ca.gov)
California Geological Survey (CGS), 2025. California Landslide Inventory and Susceptibility to Deep-Seated Landslides in California (2011). Landslide Inventory Beta. Landslide Inventory (Beta) (ca.gov) Accessed February, 2025.
California Geological Survey (CGS), 2018, Earthquake Fault Zones - A Guide for Government Agencies, Property Owners/Developers, and Geoscience Practitioners for Assessing Fault Rupture Hazards in California: California Geological Survey Special Publication 42, 83p.
California Geological Survey (CGS), 2003, Earthquake Fault Zones, Corona South Quadrangle, California 7.5 Minute Series: California Geological Survey, Revised Official Map Effective May 1, 2003.
California Geologic Survey (CGS), 2002, California Geomorphic Provinces, Note 36, California Dept. of Conservation, Sacramento, California.
California Geological Survey (CGS), 2001, Earthquake Zones of Required Investigations, 7.5- Minute Lake Forest Quadrangle (Previously El Toro Quadrangle); Official Map, released January 17, 2001.
Cao, T., Bryant, W.A., Rowshandel, B., Branum, D., and Wills, C.J., 2003, The Revised 2002 California Probabilistic Seismic Hazard Maps, California Geological Survey, available at "http://www.conservation.ca.gov/"
Costco, 2024. Costco Wholesale Development Requirements, Version 2024, dated October 31, 2022.
Item: 11
1522
25003229.001A/LH25R178197 Page 41 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
Dawson, T.E., and R.J. Weldon, 2013, Appendix B - Geologic Slip Rate Data and Geologic Deformation Model in Field, et al. 2013, Uniform California earthquake rupture forecast, version 3 (UCERF3) - The time-independent model: U.S. Geological Survey (USGS) Open-File Report 2013–1165, and California Geological Survey (CGS) Special Report 228.
Division of Safety of Dams, 2025, Dam Breach Inundation Map Web Publisher. Dam Breach Inundation Map Web Publisher (ca.gov), Accessed February 2025.
Federal Emergency Management Agency (FEMA), 2009, FIRM, Flood Insurance Rate Map, City of Lake Forest, California, Map Number 06059C0316J, Effective Date December 3, 2009 Grant, L.B. , Ballenger, L.J., and Runnerstrom, E.E., 2002, Coastal Uplift of the San Joaquin Hills, Southern Los Angeles Basin, California, by a Large Earthquake since A.D. 1635: Bulletin of the Seismological Society of America, Volume 92, No. 2, pp. 590-599 Grant, L.B., Mueller, K. J., Gath, E. M., Cheng, H., Edwards, R. L., Munro, R., and Kennedy, G.
L., 1999, Late Quaternary uplift and earthquake potential of the San Joaquin Hills, southern Los Angeles basin, California: Geology, Volume 27, No. 11, pp. 1031–1034.
International Code Council, Inc., 2022 California Building Code.
Kimley-Horn and Associates, Inc., 2025, Preliminary Overall Grading Plan, Warehouse Preliminary Set, Foothill Ranch, Sheet No. 4, dated March 14, 2025.
MG2, 2024, Concept Site Plan, Costco Wholesale, Foothill Ranch, CA, Sheet DD11-01, dated March 7, 2024.
Montrose Environmental, 2025, Second Semi-Annual 2024 Groundwater Monitoring Report Former Palisades Gas and Wash Station No. 824 26731 Portola Parkway, Lake Forest, California, Project No. 006531, Case No. 14UT002, dated January 9, 2025 Morton, D.M. and Miller, F.K., 2006, Geologic map of Santa Ana 30’ x 60’ Quadrangle, California:
United States Geological Survey Open-File Report 2006-1217, scale 1:100,000.
Orange County Water District (OCWD), City of La Habra and Irvine Ranch Water District (IRWD), 2022, Basin 8-1 Alternative 2022 Update, dated January 1, 2022.
Item: 11
1523
25003229.001A/LH25R178197 Page 42 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
PBLA Surveying, Inc., 2025, A.L.T.A./N.S.P.S. Land Title Survey, City of Foothill Ranch, County of Orange, State of California, Job No. 5001-1056, 6 Sheets, dated February 3, 2025.
Petersen, M.D., Frankel, A.D., Harmsen, S.C., Mueller, C.S., Haller, K., Wheeler, R.L., Wesson, R.L., Zeng, Y., Boyd, O.S., Perkins, D.M., Luco, N., Field, E.H., Wills, C.J., and Rukstales, K.S., 2008, Documentation for the 2008 Update of the United States National Seismic Hazard Maps: U.S. Geological Survey (USGS), Open-File Report 2008–1128, 61p.
Portland Cement Association (PCA), 1984, Thickness Design for Concrete Highway and Street Pavements, Skokie, Illinois: Portland Cement Association.
Portland Cement Association, 1988. Design and Control of Concrete Mixtures, Portland Cement Association, Skokie, Illinois.
Pridmore, C.L., 2000, Liquefaction Zones in the El Toro 7.5-Minute Quadrangle, Orange County, California in Seismic Hazard Zone Report for the El Toro 7.5-Minute Quadrangle, Orange County, California: California Geological Survey Seismic Hazard Zone Report 047, pp. 3- 18.
Roberge, P., 2006, Corrosion Basics, 2nd ed.
Schoellhamer, J.E., Vedder, J.G., Yerkes, R.F., and Kinney, D.M., 1981, Geology of the Northern Santa Ana Mountains, California: U.S. Geologic Survey Professional Paper 420-D, 109p, 4 plates, Map Scale 1:24,000.
Singer, J.A. 1973, Geohydrology and artificial-recharge potential of the Irvine area, Orange County, California: U.S. Geological Survey Open File Report 73-264, 41p.
State of California, 2021, Tsunami Hazard Area Map, Orange County; produced by the California Geological Survey and the California Governor's Office of Emergency Services; dated 2021, displayed at multiple scales.
United States Geological Survey (USGS), 2025, Areas of Land Subsidence in California, website accessed February, 2025 at: Subsiding Areas in California | USGS California Water Science Center
United States Geological Survey (USGS), 1949, El Toro Quadrangle, Orange County, California:
7.5 Minute Series (Topographic) 1:24,000 scale.
Item: 11
1524
25003229.001A/LH25R178197 Page 43 of 43 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
United States Geologic Survey (USGS) and California Geological Survey (CGS), Quaternary fault and fold database for the United States, accessed February 5, 2025 at https://www.usgs.gov/programs/earthquake-hazards/faults Item: 11
1525
25003229.001A/LH25R178197 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
FIGURES
Item: 11
1526
The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information. CAD FILE: C:\Users\DFahrney\OneDrive - Kleinfelder\CADD\25003229\25003229_Costco_Foothill-Ranch.dwg N
DRAWN BY:
PROJECT:
CHECKED BY:
REVISED:
DATE:
FIGURE SITE VICINITY MAP 25003229
DMF
HM
01/2025
- 1
2,000 1,000 0 2,000
APPROXIMATE SCALE (feet)
SOURCE: U.S.G.S. 7.5' topographic series, Lake Forest,
California quadrangle, dated 2022. PLOTTED: 4/4/2025 1:21 PM BY: dean fahrney SITE
PROPOSED COSTCO WHOLESALE WAREHOUSE
26602 TOWNE CENTRE DRIVE
FOOTHILL RANCH, CALIFORNIA
Item: 11
1527
© 2025 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS B-1
B-21
B-5 B-22
B-6
B-24
B-4
B-14
B-11
B-13
B-15
B-12
B-20
B-19
B-26
B-25
B-28
B-16
B-17
B-18
B-27
B-23
B-8
B-2
B-3
B-10
B-9
B-7
INF-3
INF-1
A
C
B
C'
D'
B'
A'
D
INF-4
INF-2 CAD FILE: C:\Users\DFahrney\OneDrive - Kleinfelder\CADD\25003229\25003229_Costco_Foothill-Ranch.dwg LAYOUT: 2 PLOTTED: 4/4/2025 1:47 PM BY: dean fahrney The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.
N
150 75 0 150
APPROXIMATE SCALE (feet)
FIGURE
DRAWN BY
DATE:
PROJECT:
CHECKED BY
REVISED:
EXPLORATION LOCATION MAP 25003229
DMF
HM
01/2025
-
PROPOSED COSTCO WHOLESALE WAREHOUSE 2
26602 TOWNE CENTRE DRIVE
FOOTHILL RANCH, CALIFORNIA
TOWNE CENTER DR
MARKET PL
FOOTHILL TRANSPORTATION CORRIDOR - 241
EXPLANATION
B-28 APPROXIMATE BORING LOCATION
INF-4 APPROXIMATE INFILTRATION TEST LOCATION
PROPOSED
RETAINING WALL
Item: 11
1528
ELEVATION ELEVATION
720
730
740
750
760
770
780
790
800
720
730
740
750
760
770
780
790
800
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+10
PROPOSED COSTCO
WHOLESALE WAREHOUSE A (FFE = 782.20 FEET) A'
B-1
(PROJ. 37' NE)
B-9
(PROJ. 48' SW)
B-10
(PROJ. 51' NE)
INF-3
(PROJ. 52' NE)
INF-4
(PROJ. 1' NE)
TD=49.5'
TD=20.5' TD=20'
TD=5'
TD=10'
EXISTING
GRADE
PROPOSED
GRADE
PROPOSED
FILL
INF-2
(PROJ. 83' NE)
TD=10'
BUILDING PAD: WITHIN 10 FT OF
PAD, AT LEAST 5 FEET BELOW
EXISITING OR 3 FEET BELOW
FOOTINGS, WHICHEVER IS DEEPER
PAVEMENT: PROOF-ROLL
EXPOSED SUBGRADE.
OVEREXCAVATE SOFT AND
YIELDING MATERIAL IF
ENCOUNTERED
RETAINING WALL: AT LEAST
2 FEET BELOW EXISITING OR
2 FEET BELOW FOOTINGS,
WHICHEVER IS DEEPER
CAPISTRANO
FORMATION
CAPISTRANO
FORMATION
CAPISTRANO
FORMATION
ARTIFICIAL
FILL
?
?
? ?
?
?
? CAD FILE: C:\Users\DFahrney\OneDrive - Kleinfelder\CADD\25003229\25003229_Costco_Foothill-Ranch.dwg LAYOUT: 3 PLOTTED: 4/4/2025 2:28 PM BY: dean fahrney The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.
FIGURE
DRAWN BY
DATE:
PROJECT:
CHECKED BY
REVISED:
CROSS-SECTION A-A' 25003229
DMF
HM
01/2025
-
PROPOSED COSTCO WHOLESALE WAREHOUSE 3
26602 TOWNE CENTRE DRIVE
FOOTHILL RANCH, CALIFORNIA
VERTICAL SCALE: 1" = 10'
HORIZONTAL SCALE: 1" = 100'
0 0 100
10 B-36
(PROJ.15' N)
APPROXIMATE BORING ELEVATION
PROJECTION OF BORING IN FEET
APPROXIMATE TEST DEPTH AND LENGTH OF BORING
ARTIFICIAL FILL SILTY TO CLAYEY SAND WITH VARYING AMOUNTS OF GRAVEL
EXPLANATION
TD=11.5'
NOTE: REFER TO APPENDIX A FOR DETAILED LOGS
CAPISTRANO FORMATION HIGHLY WEATHERED SANDSTONE. EXCAVATES AS
POORLY TO WELL GRADED SAND AND SILTY SAND
Item: 11
1529
ELEVATION ELEVATION
720
730
740
750
760
770
780
790
800
720
730
740
750
760
770
780
790
800
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+70
PROPOSED COSTCO
WHOLESALE WAREHOUSE B (FFE = 782.20 FEET) B'
B-5
(PROJ. 11' SW) B-6
(PROJ. 53' NE) B-11
(PROJ. 19' SW)
B-13
(PROJ. 11' SW)
B-15
(PROJ. 20' SW) B-19
(PROJ. 74' SW) B-16
(PROJ. 106' NE) B-17
(PROJ. 70' NE)
TD=20.5'
TD=21' TD=20.5'
TD=21'
TD=49'
TD=11'
TD=10.5'
TD=10.5'
EXISTING
GRADE
PROPOSED
GRADE
PROPOSED
FILL
BUILDING PAD: WITHIN 10 FT OF
PAD, AT LEAST 5 FEET BELOW
EXISITING OR 3 FEET BELOW
FOOTINGS, WHICHEVER IS DEEPER
PAVEMENT: PROOF-ROLL
EXPOSED SUBGRADE.
OVEREXCAVATE SOFT AND
YIELDING MATERIAL IF
ENCOUNTERED
CAPISTRANO
FORMATION
CAPISTRANO
FORMATION
CAPISTRANO
FORMATION
ARTIFICIAL
FILL
?
?
?
?
?
?
?
?
? ? ?
PROPOSED
CUT CAD FILE: C:\Users\DFahrney\OneDrive - Kleinfelder\CADD\25003229\25003229_Costco_Foothill-Ranch.dwg LAYOUT: 4 PLOTTED: 4/4/2025 2:31 PM BY: dean fahrney The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.
FIGURE
DRAWN BY
DATE:
PROJECT:
CHECKED BY
REVISED:
CROSS-SECTION B-B' 25003229
DMF
HM
01/2025
-
PROPOSED COSTCO WHOLESALE WAREHOUSE 4
26602 TOWNE CENTRE DRIVE
FOOTHILL RANCH, CALIFORNIA
VERTICAL SCALE: 1" = 10'
HORIZONTAL SCALE: 1" = 100'
0 0 100
10 B-36
(PROJ.15' N)
APPROXIMATE BORING ELEVATION
PROJECTION OF BORING IN FEET
APPROXIMATE TEST DEPTH AND LENGTH OF BORING
ARTIFICIAL FILL SILTY TO CLAYEY SAND WITH VARYING AMOUNTS OF GRAVEL
EXPLANATION
TD=11.5'
NOTE: REFER TO APPENDIX A FOR DETAILED LOGS
CAPISTRANO FORMATION HIGHLY WEATHERED SANDSTONE. EXCAVATES AS
POORLY TO WELL GRADED SAND AND SILTY SAND
Item: 11
1530
ELEVATION ELEVATION
720
730
740
750
760
770
780
790
800
720
730
740
750
760
770
780
790
800
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+90
PROPOSED COSTCO
WHOLESALE WAREHOUSE C (FFE = 782.20 FEET) C'
INF-1
(PROJ. 14' SE)
B-1
(PROJ. 15' SE)
B-2
(PROJ. 15' SE)
B-3
(PROJ. 4' SE)
B-4
(PROJ. 24' SE)
B-5
(PROJ. 22' NW)
B-22
(PROJ. 82' NW)
B-23
(PROJ. 38' SE)
TD=10.5'
TD=10.5'
TD=21'
TD=21' TD=21'
TD=20.5'
TD=5'
TD=49.5'
EXISTING
GRADE
PROPOSED
PROPOSED GRADE
FILL
PROPOSED
CUT
BUILDING PAD: WITHIN 10 FT OF
PAD, AT LEAST 5 FEET BELOW
EXISITING OR 3 FEET BELOW
FOOTINGS, WHICHEVER IS DEEPER
PAVEMENT: PROOF-ROLL
EXPOSED SUBGRADE.
OVEREXCAVATE SOFT AND
YIELDING MATERIAL IF
ENCOUNTERED
CAPISTRANO
FORMATION
CAPISTRANO
FORMATION
ARTIFICIAL
FILL
ARTIFICIAL
FILL
? ?
?
?
?
?
?
?
? CAD FILE: C:\Users\DFahrney\OneDrive - Kleinfelder\CADD\25003229\25003229_Costco_Foothill-Ranch.dwg LAYOUT: 5 PLOTTED: 4/4/2025 2:45 PM BY: dean fahrney The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.
FIGURE
DRAWN BY
DATE:
PROJECT:
CHECKED BY
REVISED:
CROSS-SECTION C-C' 25003229
DMF
HM
01/2025
-
PROPOSED COSTCO WHOLESALE WAREHOUSE 5
26602 TOWNE CENTRE DRIVE
FOOTHILL RANCH, CALIFORNIA
VERTICAL SCALE: 1" = 10'
HORIZONTAL SCALE: 1" = 100'
0 0 100
10 B-36
(PROJ.15' N)
APPROXIMATE BORING ELEVATION
PROJECTION OF BORING IN FEET
APPROXIMATE TEST DEPTH AND LENGTH OF BORING
ARTIFICIAL FILL SILTY TO CLAYEY SAND WITH VARYING AMOUNTS OF GRAVEL
EXPLANATION
TD=11.5'
NOTE: REFER TO APPENDIX A FOR DETAILED LOGS
CAPISTRANO FORMATION HIGHLY WEATHERED SANDSTONE. EXCAVATES AS
POORLY TO WELL GRADED SAND AND SILTY SAND
Item: 11
1531
ELEVATION ELEVATION
720
730
740
750
760
770
780
790
800
720
730
740
750
760
770
780
790
800
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+60
PROPOSED COSTCO
WHOLESALE WAREHOUSE D (FFE = 782.20 FEET) D'
INF-3
(PROJ. 51' NW)
B-14
(PROJ. 0')
B-15
(PROJ. 32' NW)
B-20
(PROJ. 34' NW)
B-21
(PROJ. 89' SE)
TD=5'
TD=20.5'
TD=49'
TD=10.5' TD=11'
EXISTING
GRADE
PROPOSED
GRADE PROPOSED
FILL
BUILDING PAD: WITHIN 10 FT OF
PAD, AT LEAST 5 FEET BELOW
EXISITING OR 3 FEET BELOW
FOOTINGS, WHICHEVER IS DEEPER
PAVEMENT: PROOF-ROLL
EXPOSED SUBGRADE.
OVEREXCAVATE SOFT AND
YIELDING MATERIAL IF
ENCOUNTERED
RETAINING WALL: AT LEAST
2 FEET BELOW EXISITING OR
2 FEET BELOW FOOTINGS,
WHICHEVER IS DEEPER
CAPISTRANO
FORMATION
CAPISTRANO
FORMATION
ARTIFICIAL
FILL
?
?
?
?
?
? ? ? ? CAD FILE: C:\Users\DFahrney\OneDrive - Kleinfelder\CADD\25003229\25003229_Costco_Foothill-Ranch.dwg LAYOUT: 6 PLOTTED: 4/4/2025 11:52 AM BY: dean fahrney The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.
FIGURE
DRAWN BY
DATE:
PROJECT:
CHECKED BY
REVISED:
CROSS-SECTION D-D' 25003229
DMF
HM
01/2025
-
PROPOSED COSTCO WHOLESALE WAREHOUSE 6
26602 TOWNE CENTRE DRIVE
FOOTHILL RANCH, CALIFORNIA
VERTICAL SCALE: 1" = 10'
HORIZONTAL SCALE: 1" = 100'
0 0 100
10 B-36
(PROJ.15' N)
APPROXIMATE BORING ELEVATION
PROJECTION OF BORING IN FEET
APPROXIMATE TEST DEPTH AND LENGTH OF BORING
ARTIFICIAL FILL SILTY TO CLAYEY SAND WITH VARYING AMOUNTS OF GRAVEL
EXPLANATION
TD=11.5'
NOTE: REFER TO APPENDIX A FOR DETAILED LOGS
CAPISTRANO FORMATION HIGHLY WEATHERED SANDSTONE. EXCAVATES AS
POORLY TO WELL GRADED SAND AND SILTY SAND
Item: 11
1532
25003229.001A/LH25R178197 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
APPENDIX A
FIELD EXPLORATIONS
Item: 11
1533
25003229.001A/LH25R178197 Page A-1 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
APPENDIX A
FIELD EXPLORATIONS
GENERAL
Subsurface conditions at the site were explored by drilling 28 borings. In addition, 4 borehole infiltration tests were performed. The borings and infiltration tests were drilled by 2R Drilling, Inc. using truck-mounted, hollow-stem-auger drilling equipment to depths of between approximately 5 and 49½ feet below the existing ground surface (bgs) in the warehouse building, and parking and drive areas. The approximate locations of the borings and infiltration tests are presented on Figure 2.
Prior to commencement of the fieldwork, Underground Service Alert (USA) was notified and various geophysical techniques were used at the exploration locations to identify potential conflicts with subsurface structures.
The boring and infiltration test logs are presented as Figures A-4 through A-37. An explanation to the logs is presented as Figures A-1 through A-3. The exploration logs describe the earth materials encountered, samples obtained and show field and laboratory tests performed. The logs also shows the location, boring number, drilling date and the name of the drilling subcontractor.
The borings were logged by a Kleinfelder engineer or geologist using the Unified Soil Classification System. The boundaries between soil types shown on the logs are approximate because the transition between different soil layers may be gradual. Bulk and drive samples of selected earth materials were obtained from the borings.
A modified-California sampler was used to obtain drive samples of the soil encountered. This sampler consists of a 3-inch O.D., 2.4-inch I.D. split barrel shaft that is pushed or driven a total of 18-inches into the soil at the bottom of the boring. The soil was retained in six 1-inch brass rings for laboratory testing. An additional 2 inches of soil from each drive remained in the cutting shoe and was usually discarded after visually classifying the soil. The sampler was driven using a 140-pound hammer falling 30 inches. The total number of blows required to drive the sampler the final 12 inches is termed blow count and is recorded on the Log of Boring.
Samples were also obtained using a Standard Penetration Sampler (SPT). This sampler consists of a 2-inch O.D., 1-inch I.D. split barrel shaft that is advanced into the soils at the bottom of the drill hole a total of 18 inches. The sampler was driven using a 140-pound hammer falling 30 inches. The total number of hammer blows required to drive the sampler the final 12 inches is Item: 11
1534
25003229.001A/LH25R178197 Page A-2 April 4, 2025
© 2025 Kleinfelder www.kleinfelder.com
termed the blow count (N) and is recorded on the Log of Boring. The procedures we employed in the field are generally consistent with those described in ASTM Standard Test Method D1586.
Bulk and grab samples of the near-surface soils were directly retrieved from the auger cuttings from the borings.
Item: 11
1535
A-1
FIGURE GRAPHICS KEY
Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
The report and graphics key are an integral part of these logs. All data and interpretations in this log are subject to the explanations and limitations stated in the report.
Solid lines separating strata on the logs represent approximate boundaries only, dashed lines are inferred or extrapolated boundaries.
Actual transitions may be gradual or differ from those represented.
No warranty is provided as to the continuity of soil or rock conditions between individual sample locations.
Logs represent general soil or rock conditions observed at the point of exploration on the date indicated.
In general, Unified Soil Classification System (ASTM D2488/D2487) designations presented on the logs were based on visual classification in the field and were modified where appropriate based on gradation and index property testing.
Fine grained soils that plot within the hatched area on the Plasticity Chart, and coarse grained soils with between 5% and 12% passing the No. 200 sieve require dual USCS symbols, ie., CL-ML, GW-GM, GP-GM, GW-GC, GP-GC, GC-GM, SW-SM, SP-SM, SW-SC, SP-SC, SC-SM.
If sampler is not able to be driven at least 6 inches then 50/X indicates number of blows required to drive the identified sampler X inches with a 140 pound hammer falling 30 inches.
ABBREVIATIONS
Cu - Coefficients of Uniformity
CC - Coefficients of Curvature
WOH - Weight of Hammer
WOR - Weight of Rod
REFERENCES
1. American Society for Testing and Materials (ASTM), 2011, ASTM D2487: Classification of Soils for Engineering Purposes (Unified Soil Classification System).
GRAVELS
WITH >
12%
FINES
SILTS AND CLAYS
(Liquid Limit
less than 50)
WELL-GRADED GRAVEL WITH SILT,
WELL-GRADED GRAVEL WITH SILT AND SAND
POORLY GRADED GRAVEL WITH CLAY (OR SILTY
CLAY), POORLY GRADED GRAVEL WITH CLAY AND
(OR SILTY CLAY AND SAND)
SILTY GRAVEL,
SILTY GRAVEL WITH SAND
CLAYEY GRAVEL,
CLAYEY GRAVEL WITH SAND
POORLY GRADED GRAVEL WITH SILT,
POORLY GRADED GRAVEL WITH SILT AND SAND
SP
CLEAN
SANDS
WITH
<5%
FINES
ML SILT, SILT WITH SAND, SILT WITH GRAVEL CL
ORGANIC CLAY, ORGANIC CLAY WITH SAND, ORGANIC CLAY WITH GRAVEL, ORGANIC SILT, ORGANIC SILT WITH SAND, ORGANIC SILT WITH GRAVEL
ORGANIC CLAY, ORGANIC CLAY WITH SAND, ORGANIC CLAY WITH GRAVEL, ORGANIC SILT, ORGANIC SILT WITH SAND, ORGANIC SILT WITH GRAVEL CL-ML
WELL-GRADED GRAVEL WITH CLAY (OR SILTY
CLAY), WELL-GRADED GRAVEL WITH CLAY AND
SAND (OR SILT CLAY AND SAND)
SILTY CLAY, SILTY CLAY WITH SAND, SILTY CLAY WITH GRAVEL ELASTIC SILT. ELASTIC SILT WITH SAND, ELASTIC SILT WITH GRAVEL
FAT CLAY, FAT CLAY WITH SAND, FAT CLAY WITH GRAVEL
OL
SANDS
WITH >
12%
FINES
CLEAN
GRAVEL
WITH
<5%
FINES
GRAVELS
WITH
5% TO
12%
FINES
SW
SW-SC
SW-SM
SC-SM
GP-GM
SILTY, CLAYEY GRAVEL
SILTY, CLAYEY GRAVEL WITH SAND
WELL-GRADED SAND,
WELL-GRADED SAND WITH GRAVEL
POORLY GRADED SAND,
POORLY GRADED SAND WITH GRAVEL
WELL-GRADED SAND WITH SILT,
WELL-GRADED SAND WITH SILT AND GRAVEL
POORLY GRADED SAND WITH SILT,
POORLY GRADED SAND WITH SILT AND GRAVEL
POORLY GRADED SAND WITH CLAY,
POORLY GRADED SAND WITH CLAY AND GRAVEL
(OR SILTY CLAY AND GRAVEL)
SILTY SAND,
SILTY SAND WITH GRAVEL
GP-GC
GC-GM
FINE GRAINED SOILS
(50% or more passes
the No. #200 sieve)
WELL-GRADED GRAVEL,
WELL-GRADED GRAVEL WITH SAND
POORLY GRADED GRAVEL,
POORLY GRADED GRAVEL WITH SAND
WELL-GRADED SAND WITH CLAY (OR SILTY CLAY),
WELL-GRADED SAND WITH CLAY AND GRAVEL
(OR SILTY CLAY AND GRAVEL)
CLAYEY SAND,
CLAYEY SAND WITH GRAVEL
COARSE GRAINED SOILS (More than 50% retained on No. 200 Sieve)
SILTY, CLAYEY SAND,
SILTY, CLAYEY SAND WITH GRAVEL
LEAN CLAY, LEAN CLAY WITH SAND, LEAN CLAY WITH GRAVEL
SILTS AND CLAYS
(Liquid Limit
50 or greater)
NOTE: USE MATERIAL DESCRIPTION ON THE LOG TO DEFINE A GRAPHIC THAT MAY NOT BE PROVIDED ON THIS LEGEND.
MH
CH
OH
BULK SAMPLE
CALIFORNIA SAMPLER
(3 in. (76.2 mm.) outer diameter)
GRAB SAMPLE
STANDARD PENETRATION SPLIT SPOON SAMPLER
(2 in. (50.8 mm.) outer diameter and 1-3/8 in. (34.9 mm.) inner diameter)
UNIFIED SOIL CLASSIFICATION SYSTEM1
SP-SM
SP-SC
SM
SC
SANDS
WITH
5% TO
12%
FINES
GM
GC
GW
GP
GW-GM
GW-GC
SANDS (50% or more of coarse fraction passes the No. 4 Sieve) GRAVELS (More than 50% of coarse fraction retained on No. 4 Sieve)
DRILLING METHOD/SAMPLER TYPE GRAPHICS
NOTES
GROUND WATER GRAPHICS
OBSERVED SEEPAGE
WATER LEVEL (level where first observed)
WATER LEVEL (additional levels after exploration)
WATER LEVEL (level after stabilizing period)
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_GEO_LEG1_GRAPHICS_KEY_W_USCS] PLOTTED: 02/13/2025 01:45 PM BY: DEdrees DATE:
CHECKED BY: H.M
DRAWN BY: D.E
25003229.001A
PROJECT NO.:
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1536
SPT-N
(# blows / ft)
FIGURE
A-2
SOIL DESCRIPTION KEY
(For additional tables, see ASTM D2488)
Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
coarse
fine
Gravel
Same color and appearance throughout
Breaks along definite planes of fracture with
little resistance to fracturing.
Homogeneous
DESCRIPTION
Alternating layers of varying material or color with layers at least 1/4-in. (6mm) thick, note thickness.
Fissured
Slickensided Fracture planes appear polished or glossy, sometimes striated.
DESCRIPTION
Non-Plastic
Low
Dry
Wet
Visible free water,
usually soil is below
water table
FIELD TEST
Absence of
moisture, dusty,
dry to the touch
Sand
Fines
GRAIN SIZE
>12 in. (304.8 mm.)
3 - 12 in. (76.2 - 304.8 mm.)
3/4 -3 in. (19 - 76.2 mm.)
0.19 - 0.75 in. (4.8 - 19 mm.)
#10 - #4 0.079 - 0.19 in. (2 - 4.9 mm.)
APPARENT
DENSITY
30 - 50
10 - 30
4 - 10
Secondary
Constituent is
Coarse Grained
Term
of
Use
<5%
With
Modifier
5 to <15%
Secondary
Constituent is
Fine Grained
15%
Trace <15%
15 to <30%
30%
AMOUNT
CRITERIA
<500
0.5 PP <1
1 PP <2
2 PP <4
4 PP
Pocket Pen
(tsf)
PP < 0.25
Medium Stiff
0.25 PP <0.5
SPT - N
(# blows / ft)
medium
SIEVE SIZE
DESCRIPTION
Damp but no
visible water
#40 - #10
0.0029 - 0.017 in. (0.07 - 0.43 mm.)
Passing #200 <0.0029 in. (<0.07 mm.)
DESCRIPTION
3 - 12 in.
3/4 -3 in.
#4 - 3/4 in.
1,000 - 2,000
2,000 - 4,000
4,000 - 8,000
>8,000
<4
Very Dense
Dense
Medium Dense
>50
Loose
Very Loose
Alternating layers of varying material or color with the layers less than 1/4-in. (6 mm) thick, note thickness. Laminated Inclusion of small pockets of different soils, such as small lenses of sand scattered through a mass of clay; note thickness. Lensed Boulders
Cobbles
0.017 - 0.079 in. (0.43 - 2 mm.)
#200 - #40
Cohesive soil that can be broken down into small angular lumps which resist further breakdown. Blocky
CRITERIA
Medium
High
CRITERIA
A 1/8 in. (3 mm) thread cannot be rolled at any water content.
The thread can barely be rolled and the lump cannot be formed when drier than the plastic limit.
The thread is easy to roll and not much time is required to reach the plastic limit. The thread cannot be rerolled after reaching the plastic limit. The lump crumbles when drier than the plastic limit.
It takes considerable time rolling and kneading to reach the plastic limit. The thread can be rerolled several times after reaching the plastic limit. The lump can be formed without crumbling when drier than the plastic limit.
coarse
fine
Moist
Rounded
Subrounded Particles have nearly plane sides but have well-rounded corners and edges.
Angular Particles have sharp edges and relatively plane sides with unpolished surfaces.
Subangular
Particles have smoothly curved sides and no edges.
Particles are similar to angular description but have rounded edges.
DESCRIPTION
None
Weak
Crumbles or breaks
with considerable finger
pressure
Moderately
Weakly
Will not crumble or
break with finger
pressure
DESCRIPTION
Strongly
FIELD TEST
Crumbles or breaks
with handling or little
finger pressure
Readily indented by thumb but penetrated only
with great effort
Easily penetrated several inches by fist
Easily penetrated several inches by thumb
Can be penetrated several inches by thumb with
moderate effort
Readily indented by thumbnail
Indented by thumbnail with difficulty
CONSISTENCY VISUAL / MANUAL CRITERIA
<2
>30
Very Soft
Strong
No visible reaction
Some reaction,
with bubbles
forming slowly
Violent reaction,
with bubbles
forming
immediately
DESCRIPTION FIELD TEST
Soft
Stiff
Very Stiff
Hard
2 - 4
4 - 8
8 - 15
15 - 30
UNCONFINED
COMPRESSIVE
STRENGTH (Qu)(psf)
>12 in.
Stratified
500 - 1,000
STRUCTURE1 ANGULARITY1
GRAIN SIZE1
CONSISTENCY - FINE-GRAINED SOIL2, 3
CEMENTATION1
APPARENT DENSITY -
COARSE-GRAINED SOIL2
PLASTICITY1 MOISTURE CONTENT1
REACTION WITH
HYDROCHLORIC ACID1
SECONDARY CONSTITUENT1
REFERENCES
1. American Society for Materials and Testing (ASTM), 2017, ASTM D2488: Standard Practice for Description and Identification of Soils (Visual Manual Procedures).
2. Terzaghi, K and Peck, R., 1948, Soil Mechanics in Engineering Practice, John Wiley & Sons, New York.
3. United States Department of the Interior Bureau of Reclamation (USBR), 1998, Earth Manual, Part I.
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [_KLF_GEO_LEG2_SOIL_DESC_KEY] PLOTTED: 02/13/2025 01:47 PM BY: DEdrees DATE:
CHECKED BY: H.M
DRAWN BY: D.E
25003229.001A
PROJECT NO.:
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1537
A-3
ROCK DESCRIPTION KEY FIGURE
Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
Slightly Fractured
Moderately Fractured
Highly Fractured
RECOGNITION
Honeycombed
Small openings in volcanic rocks
of variable shape and size formed
by entrapped gas bubbles during
solidification.
Vesicle (Vesicular)
Pit (Pitted)
None
Muscovite
Small openings (usually lined with
crystals) ranging in diameter from
0.03 ft. (3/8 in.) to 0.33 ft. (4 in.)
(10 to 100 mm.)
RQD
Bedding Planes
Fracture in rock, generally more or
less vertical or traverse to bedding.
Planes dividing the individual layers,
beds, or stratigraphy of rocks.
DESCRIPTION Thickness [in (mm)]
>36 (>915)
12 - 36 (305 - 915)
4 - 12 (102 - 305)
1 - 4 (25 - 102)
0.4 - 1 (10 - 25)
0.1 - 0.4 (2.5 - 10)
<0.1 (<2.5)
Extremely Weak
Very Weak
Weak
Medium Strong
0.25 - 1.0
1.0 - 5.0
FIELD TEST
Specimen can only be chipped with a geological hammer.
Specimen requires many blows of geological
hammer to fracture it.
Cannot be scraped or peeled with a pocket knife, specimen can be fractured with a single firm blow of a geological hammer.
Albite
Biotite
Manganese Mn
Unweathered
Entire mass discolored; Alteration
pervading most rock, some slight
weathering pockets; some
minerals may be leached out.
Tight
Open
Wide
DESCRIPTION
0.04 - 0.20 (1 - 5)
>0.20 (>5)
<0.04 (<1)
CRITERIA [in (mm)]
>6 ft. (>1.83 meters)
2 - 6 ft. (0.061 - 1.83 meters)
8 in - 2 ft. (203.20 - 609.60 mm)
Rock-quality designation (RQD) Rough measure of
the degree of jointing or fracture in a rock mass,
measured as a percentage of the drill core in lengths
of 4 in. (10 cm.) or more.
2 - 8 in (50.80 - 203.30 mm)
Joint
Seam
Intensely Fractured
SPACING CRITERIA
<2 in (<50.80 mm)
DESCRIPTION
Unfractured
Applies to bedding plane with
unspecified degree of weather.
Pinhole to 0.03 ft. (3/8 in.) (>1 to
10 mm.) openings
Vug (Vuggy)
DESCRIPTION
An opening larger than 0.33 ft. (4
in.) (100 mm.), size descriptions
are required, and adjectives such
as small, large, etc., may be used
Cavity
If numerous enough that only thin
walls separate individual pits or
vugs, this term further describes
the preceding nomenclature to
indicate cell-like form.
CRITERIA
Discoloring evident; surface pitted
and alteration penetration well
below surface; Weathering "halos"
evident; 10-50% rock altered.
No evidence of chemical /
mechanical alternation; rings with
hammer blow.
Rock reduced to soil with relic
rock texture/structure; Generally
molded and crumbled by hand.
Moderately Weathered
Slightly Weathered
DESCRIPTION
ABBR
Uk
Ta
Si
Ser
Sd
NAME
Very Thick Bedded
Epidote Ep
Ch
Ca
Cl
Ap
Strong
Very Strong
Extremely Strong
5.0 - 25
25 - 50
50 - 100
Iron Oxide Fe
Gypsum Gy
100 - 250
> 250
GRADE
Indented by thumbnail
Apatite
Clay
Calcite
Chlorite
ABBR
Bi
NAME
Unknown
Talc
Silt
Moderately Bedded
Thin Bedded
Laminated
Thinly Laminated
Sericite
Sand
Quartz
Pyrite
Qz
Py
No
Mus
Crumbles under firm blows of geological hammer,
can be peeled by a pocket knife.
Specimen requires more than one blow of geological hammer to fracture it.
Al R0
R1
R2
R3
R4
R5
R6
Poor
Very Poor
RQD (%)
Thick Bedded
Very Thin Bedded
Can be peeled by a pocket knife with difficulty, shallow indentations made by firm blow with point of geological hammer.
0 - 25
25 - 50
50 - 75
75 - 90
90 - 100
Fair
Good
Excellent
DESCRIPTION
Decomposed
Highly Weathered
Slight discoloration on surface;
slight alteration along
discontinuities; <10% rock volume
altered.
CORE SAMPLER
AQ CORE BARREL
(1.067 in. (27.1 mm.) core diameter)
AX CORE BARREL
(1.185 in. (30.1 mm.) core diameter)
BQ CORE BARREL
(1.433 in. (36.4 mm.) core diameter)
CONTINUOUS CORE SAMPLE
(2.000 in. (50.8 mm.) core diameter)
CORE SAMPLER TYPE GRAPHICS
EX CORE BARREL
(0.846 in. (21.5 mm.) core diameter)
HQ CORE SAMPLE
(2.500 in. (63.5 mm.) core diameter)
NQ CORE SAMPLE
(1.874 in. (47.6 mm.) core diameter)
NO RECOVERY CORE SAMPLE
NX CORE SAMPLE
(2.154 in. (54.7 mm.) core diameter)
REFERENCES
1. Bieniawski, Z.T., 1989, Engineering Rock Mass
Classifications. John Wiley & Sons, New York. (Mod. by
Kleinfelder).
2. Deere, D.U., and Deere, D.W., 1989, Rock Quality
Designation (RQD) After Twenty Years, USACE Contract
Report GL-89-1.
3. Federal Highway Administration (FHWA), 2002,
Subsurface Investigations, FHWA-NHI-01-031. (Mod. by
Kleinfelder).
4. International Society for Rock Mechanics (ISRM), 1978, "Suggested Methods for the Quantitative Description of
Discontinuities in Rock Masses," International Joint Rock Mechanics and Mining Sciences & Geomechanics Abstracts, Vol. 15. 5. United States Army Corps of Engineers (USACE), 1994, Rock Foundations, EM 1110-1-2908, November 30, 1994.
6. United States Department of the Interior Bureau of
Reclamation (USBR), 1998, Engineering Geology Field
Manual, Volume 1.
UCS (MPa)
4 - 6
6 - 8
2 - 4
8 - 10
10 cm
0 - 2
12 - 14
18 - 20
14 - 16
16 - 18
WEATHERING5
ADDITIONAL TEXTURAL ADJECTIVES5
DENSITY/SPACING OF DISCONTINUITIES5
INFILLING TYPE3
5 cm0
RELATIVE HARDNESS / STRENGTH DESCRIPTIONS4
ROCK QUALITY DESIGNATION (RQD)2 JOINT ROUGHNESS COEFFICIENT (JRC)4 APERTURE1
BEDDING CHARACTERISTICS6
10 - 12
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [_KLF_GEO_LEG3_ROCK_DESC_KEY] PLOTTED: 02/13/2025 01:47 PM BY: DEdrees DATE:
CHECKED BY: H.M
DRAWN BY: D.E
25003229.001A
PROJECT NO.:
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1538
113.8
109.8
Asphalt: approximately 3.5"
Aggregate Base: approximately 5"
Artificial Fill
Silty SAND (SM): fine to medium sand, low
plasticity, brown, moist
light gray, loose
medium dense
Capistrano Formation
SANDSTONE: excavates as silty sand (SM),
light gray, fine to medium sand, moist, highly
weathered, very weak (R1)
light olive gray, decrease in fines
light gray
olive gray
excavates as clayey sand (SC), olive-light
brown, fine to medium sand, low plasticity
18"
18"
10"
10"
2"
10"
3"
9.8 11.6
9.0 8.6
BC=9
9 6
BC=10
12 14
BC=24
50/4"
BC=23
50/4"
BC=50/2"
BC=20
50/4"
BC=50/3"
30 Hand auger 5ft bgs
5 1 of 2
FIELD EXPLORATION
A-1
LABORATORY RESULTS
Lithologic Description
BORING LOG B-1
PAGE:
BORING LOG B-1
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67737°
Longitude: -117.67003°
Ground Surface Elevation (ft.): 781.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Windy Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/13/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
780
775
770
765
760
755
750
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 6
7 PLOTTED: 02/14/2025 11:47 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1539
Capistrano Formation
SANDSTONE: excavates as silty sand (SM),
light gray, fine to medium sand, moist, trace
clay, trace subangular gravel, highly
weathered, very weak (R1)
fine to coarse sand
excavates as poorly graded sand with silt
(SP-SM), light gray, fine to medium sand
The boring was terminated at approximately
49.5 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 13, 2025.
6"
4"
6"
12"
BC=50/6"
BC=50/4"
BC=50/6"
BC=32
50/6"
Groundwater was not observed during drilling or after
completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
2 of 2
FIELD EXPLORATION
A-2
LABORATORY RESULTS
Lithologic Description
BORING LOG B-1
PAGE:
BORING LOG B-1
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67737°
Longitude: -117.67003°
Ground Surface Elevation (ft.): 781.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Windy Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/13/2025
Depth (feet)
40 45
50 55
60 65
Elevation (feet)
745
740
735
730
725
720
715
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
8 9
10 11
PLOTTED: 02/14/2025 11:47 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1540
116.7
119.7
21 Asphalt: approximately 4"
Aggregate Base: approximately 4"
Artifical Fill
Clayey SAND (SC): fine to medium sand,
light brown, moist, trace fine anglar gravel
Silty SAND (SM): fine to medium sand,
non-plastic to low plasticity, light gray, moist,
trace clay
medium dense
Clayey SAND (SC): fine to medium sand,
olive gray, moist, trace coarse sand
medium dense
Capistrano Formation
SANDSTONE: excavates as silty clayey sand
(SC-SM), light gray, fine to medium sand,
moist, trace gravel, highly weathered, very
weak (R1)
excavates as silty sand (SM), light gray, fine to
coarse sand
The boring was terminated at approximately
21 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 13, 2025.
18"
18"
18"
18"
12"
9.4 12.0
14.8 13.1
11.6 BC=5
8 9
BC=10
17 22
BC=8
14 14
BC=8
15 21
BC=26
50/6"
Hand auger 5ft bgs
Corrosion Test
Groundwater was not observed during drilling or after
completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
1 of 1
FIELD EXPLORATION
A-3
LABORATORY RESULTS
Lithologic Description
BORING LOG B-2
PAGE:
BORING LOG B-2
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67753°
Longitude: -117.66967°
Ground Surface Elevation (ft.): 782.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Windy Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/13/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
780
775
770
765
760
755
750
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 6
PLOTTED: 02/14/2025 11:48 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1541
117.8
120.9
Asphalt: approximately 4"
Aggregate Base: approximately 3"
Artificial Fill
Clayey SAND (SC): fine to medium sand, low
plasticity, brown, moist
medium dense
Silty SAND (SM): fine to medium sand, light
gray, moist
non-plastic to low plasticity
medium dense
Capistrano Formation
SANDSTONE: fine to medium sand,
excavates as silty sand (SM), light gray, fine to
coarse sand, moist, highly weathered, very
weak (R1)
olive-light gray, fine to medium sand
The boring was terminated at approximately
21 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 13, 2025.
18"
18"
18"
18"
9"
11.8 12.0
10.8 10.6
BC=12
18 14
BC=7
10 9
BC=11
17 20
BC=15
26 50
BC=40
50/3"
29 Hand auger 5ft bgs
3 Groundwater was not observed during drilling or after completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
1 of 1
FIELD EXPLORATION
A-4
LABORATORY RESULTS
Lithologic Description
BORING LOG B-3
PAGE:
BORING LOG B-3
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67768°
Longitude: -117.66928°
Ground Surface Elevation (ft.): 783.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Windy Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/13/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
780
775
770
765
760
755
750
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 PLOTTED: 02/14/2025 11:48 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1542
112.2
16 Asphalt: approximately 3"
Aggregate Base: approximately 6"
Artificial Fill
Silty SAND (SM): fine to medium sand,
brown, moist, trace clay, tree branches
Capistrano Formation
SANDSTONE: excavates as silty sand (SM),
light gray, fine to medium sand, moist, highly
weathered, very weak (R1)
trace coarse sand
fine to coarse sand
increase in fines, fine to medium sand
The boring was terminated at approximately
21 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 16, 2025.
10"
3"
3"
6"
10"
8.1 7.3
BC=19
50/4"
BC=50/3"
BC=50/3"
BC=50/6"
BC=39
50/4"
Hand auger 5ft bgs
Groundwater was not observed during drilling or after
completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
1 of 1
FIELD EXPLORATION
A-5
LABORATORY RESULTS
Lithologic Description
BORING LOG B-4
PAGE:
BORING LOG B-4
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67789°
Longitude: -117.66894°
Ground Surface Elevation (ft.): 784.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Sunny Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/16/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
780
775
770
765
760
755
750
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 PLOTTED: 02/14/2025 11:48 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1543
125.9
102.6
Asphalt: approximately 3"
Aggregate Base: approximately 5"
Artificial Fill
Clayey SAND (SC): fine to medium sand, low
plasticity, brown, moist, trace coarse sand
Silty SAND (SM): fine to medium sand,
non-plastic to low plasticity, olive gray, moist
dense
Capistrano Formation
SANDSTONE: excavates as silty sand (SM),
light gray, fine to medium sand, moist, highly
weathered, very weak (R1)
excavates as poorly graded sand (SP)
excavates as silty sand (SM)
increase in fines, trace coarse sand
The boring was terminated at approximately
20.5 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 16, 2025.
18"
17"
5"
11"
4"
11.0 11.7
13.4 BC=13
21 31
BC=35
35 50/5"
BC=50/5"
BC=31
50/5"
BC=50/4"
25 Hand auger 5ft bgs
3 Groundwater was not observed during drilling or after completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
1 of 1
FIELD EXPLORATION
A-6
LABORATORY RESULTS
Lithologic Description
BORING LOG B-5
PAGE:
BORING LOG B-5
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67792°
Longitude: -117.66856°
Ground Surface Elevation (ft.): 782.5
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Sunny Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/16/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
780
775
770
765
760
755
750
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 PLOTTED: 02/14/2025 11:48 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1544
140.0
Asphalt: approximately 3"
Aggregate Base: approximately 6"
Artificial Fill
Clayey SAND (SC): fine to medium sand, low
plasticity, brown, moist
Capistrano Formation
SANDSTONE: excavates as poorly graded
sand (SP), gray, fine to coarse sand, moist,
highly weathered, very weak (R1)
excavates as silty sand (SM), light gray, fine
to medium sand
excavates as clayey sand (SC), olive gray
excavates as poorly graded sand with silt
(SP-SM), gray
The boring was terminated at approximately
21 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 15, 2025.
18"
3"
9"
5"
9"
13.6 2.0
10.9 BC=6
6 7
BC=50/3"
BC=33
50/3"
BC=50/5"
BC=37
50/3"
Hand auger 5ft bgs
Groundwater was not observed during drilling or after
completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
1 of 1
FIELD EXPLORATION
A-7
LABORATORY RESULTS
Lithologic Description
BORING LOG B-6
PAGE:
BORING LOG B-6
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67768°
Longitude: -117.66864°
Ground Surface Elevation (ft.): 781.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Sunny Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/15/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
780
775
770
765
760
755
750
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 PLOTTED: 02/14/2025 11:48 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1545
123.5
111.4
19 Asphalt: approximately 4"
Aggregate Base: approximately 6"
Artificial Fill
Clayey SAND (SC): fine to medium sand, low
plasticity, grayish brown, moist, trace gravel
up to 0.75"
Silty SAND (SM): fine to medium sand,
non-plastic, olive gray, moist, trace coarse
sand
dense
light gray
Capistrano Formation
SANDSTONE: excavates as silty sand (SM),
light gray, fine sand, moist, highly weathered,
very weak (R1)
excavates as poorly graded sand with silt
(SP-SM), fine to medium sand
fine to coarse sand
The boring was terminated at approximately
20.5 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 16, 2025.
18"
18"
11"
11"
5"
10.9 11.7
12.6 9.4
BC=15
21 25
BC=7
13 27
BC=26
50/5"
BC=29
50/5"
BC=50/5"
NP
Hand auger 5ft bgs
NP
Groundwater was not observed during drilling or after
completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
1 of 1
FIELD EXPLORATION
A-8
LABORATORY RESULTS
Lithologic Description
BORING LOG B-7
PAGE:
BORING LOG B-7
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67754°
Longitude: -117.66888°
Ground Surface Elevation (ft.): 780.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Sunny Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/16/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
775
770
765
760
755
750
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 PLOTTED: 02/14/2025 11:48 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1546
120.6
110.4
Asphalt: approximately 4"
Aggregate Base: approximately 6"
Artificial Fill
Clayey SAND with Gravel (SC): fine to
medium sand, low plasticity, brown, moist,
angular to subangular gravel up to 0.5"
Silty SAND (SM): fine to medium sand, olive,
moist
medium dense
Capistrano Formation
SANDSTONE: excavates as silty sand (SM),
fine sand, light gray, highly weathered, very
weak (R1)
fine to medium sand
trace coarse sand
excavates as poorly graded sand with silt
(SP-SM), fine to medium sand, subangular
gravel up 0.5"
The boring was terminated at approximately
20.5 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 13, 2025.
18"
11"
9"
11"
5"
12.8 8.7
7.9 8.0
BC=18
17 23
BC=17
50/5"
BC=45
50/3"
BC=32
50/5"
BC=50/5"
Hand auger 5ft bgs
Groundwater was not observed during drilling or after
completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
1 of 1
FIELD EXPLORATION
A-9
LABORATORY RESULTS
Lithologic Description
BORING LOG B-8
PAGE:
BORING LOG B-8
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67740°
Longitude: -117.66930°
Ground Surface Elevation (ft.): 779.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Windy Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/13/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
775
770
765
760
755
750
745
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 PLOTTED: 02/14/2025 11:48 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1547
115.3
107.8
16 Asphalt: approximately 4"
Aggregate Base: approximately 3"
Artificial Fill
Silty SAND (SM): fine to medium sand, olive
brown, moist
olive to light brown, medium dense
Capistrano Formation
SANDSTONE: excavates as silty sand (SM),
light gray, fine to medium sand, moist, highly
weathered, very weak (R1)
fine sand
excavates as poorly graded sand (SP-SM),
fine to medium sand
The boring was terminated at approximately
20.5 ft. below ground surface. The boring was
backfilled with auger cuttings and patched at
surface on January 13, 2025.
18"
9"
10"
4"
6"
10.1 7.9
7.9 6.7
BC=8
9 9
BC=28
50/3"
BC=40
50/4"
BC=50/4"
BC=50/6"
27 Hand auger 5ft bgs
5 Groundwater was not observed during drilling or after completion.
GENERAL NOTES:
The exploration location and elevation are approximate.
Coordinates were obtained from Google Earth and the elevation was obtained from ALTA survey map prepared by PBLA
Surveying.
GROUNDWATER LEVEL INFORMATION:
1 of 1
FIELD EXPLORATION
A-10
LABORATORY RESULTS
Lithologic Description
BORING LOG B-9
PAGE:
BORING LOG B-9
FIGURE
Dry Unit Wt. (pcf)Passing #4 (%)Passing #200 (%)
Latitude: 33.67724°
Longitude: -117.66964°
Ground Surface Elevation (ft.): 778.0
Surface Condition: Asphalt
Not Available
Drilling Company: 2R Drilling
Drilling Method:
Drilling Equipment:
Windy Bore Diameter:
Hammer Type - Drop: 140 lb. Auto - 30 in.
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
CME-75
8 in. O.D.
D. Edrees
Plunge: -90 degrees Hollow Stem Auger
Cody/ David/ Antonio
1/13/2025
Depth (feet)
5 10
15 20
25 30
Elevation (feet)
775
770
765
760
755
750
745
Graphical LogBlow Counts(BC)= Uncorr. blows/6 inRecovery(NR=No Recovery)USCSSymbolWaterContent (%)Liquid LimitsPlasticity Index(NP=NonPlastic)Additional Tests/Remarks Proposed Costco Wholesale
Warehouse and Fuel Facility
26602 Towne Centre Drive
Foothill Ranch, California
SampleNumber
1 2
3 4
5 PLOTTED: 02/14/2025 11:48 AM BY: HMarquez
gINT FILE: Klf_gint_master_2025 PROJECT NUMBER: 25003229.001A OFFICE FILTER: LAGUNA HILLSgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2025.GLB [__KLF_BORING/TEST PIT SOIL LOG] DATE:
CHECKED BY: H.M
DRAWN BY: D.E
PROJECT NO.:
25003229.001ASample Type
Proposed Costco Wholesale Warehouse
26602 Towne Centre Drive
Foothill Ranch, California
Item: 11
1548
126.6
115.6
Asphalt: approximately 4"
Aggregate Base: approximately 3"
Artificial Fill
Silty SAND (SM): fine to medium sand, olive
brown, moist
light gray, dense
Capistrano Formation
SANDSTONE: excavates as silty sand (SM),
light gray, fine sand, moist, highly weathered,
very weak (R1)
fine to medium sand