Text extracted from the city's file for reading and search. Open the original on www.cityoflakeport.com. That file is the official record.

3. The storage tanks are installed in a containment area to contain any potential chemical leaks. A containment leak switch will be provided to an alarm in the event that the containment area is flooded.
13370
C. CHLORINE SYSTEM MONITORING

1. Existing chlorine analyzers will be reconfigured as a part of the system to provide for chlorine monitoring associated with the new chemical feed system.

The chlorine analyzers will provide for the chlorine residuals indicated and will include the following alarm conditions
a. High-High Chlorine Alarm – Stop Chemical Feed Pump(s) b. High Chlorine Warning
c. Low Chlorine Warning
d. Low-Low Chlorine Alarm
e. Chlorine Signal Loss
D. CHEMICAL FEED PUMP (CFP-2111 and CFP-2121) CONTROL

1. Chlorine Feed Pumps will be provided with the following signals for monitoring and control from the PLC and SCADA system:
a. Chlorine Pump Running
b. Chlorine Pump Ready
c. Chlorine Pump Failure
d. Chlorin Pump Start/Stop
e. Chlorine Pump Speed Control (Pacing Signal)
f. Chlorine Pump Speed Feedback

2. Chemical Feed Process Variables
a. Plant Effluent Flow
b. Effluent Chlorine Residual

3. Chemical Feed Controls
a. Local Control - The chemical feed pump is locally controlled at the feed pumps control panel.
b. PLC – Automatic Control. The chemical feed pump is controlled by the PLC based on a selected mode of control.
c. SCADA Manual Control – The chemical feed pump is manually controlled at the SCADA display.

4. Automatic control modes
a. Mode of control is selected at the SCADA. The operator will place the Chemical feed pump into Auto and select a desired mode of operation.

5. The chemical feed pump controls modes:
a. On/Off Control – When selected for On/Off control the PLC will start the associated chemical feed pump based on an associated pump running or process flow switch is detected. This mode is generally utilized when a flow pacing signal is not available
13370
(1) SCADA Speed Control – The operator will select SCADA manual control and manually set the speed from the SCADA workstation. (2) In this mode the Pump will Start/Stop automatically from the PLC and utilize the last SCADA speed setpoint value for chemical feed rate.
b. Open Loop Control (Flow pacing) – The PLC will control the chemical pump feed rate based on its associated flow pacing signal. The chemical feed output will be provided with operator adjustable ratio and offset setpoints.
c. Open Loop Control with Trim – The PLC will control the chemical feed rate based on its associated flow pacing signal and a chlorine residual process feedback variable for trimming the output to maintain a desired process parameter such as Chlorine Residual. This mode is often utilized to control chemical waste and maintain residual within a control band.

6. Chemical Feed Pump Control
a. The chemical feed pumps are configured as a duty/standby pump configuration. The duty pump is selected at the SCADA and remaining pump becomes the standby pump.
b. Under normal operation, the duty feed pump is started whenever an effluent pump is started, and the effluent flow is above a minimum setpoint. When these conditions are met the chemical feed rate (dosage) is controlled by PLC based on the existing effluent flow signal. c. The chemical feed pumps will continue to operate until the flow fails below the minimum flow setpoint or the effluent pumps are not running. -END OF SECTION-
15060
SECTION 15060

PIPE AND PIPING SYSTEMS
PART 1 – GENERAL

1.1 SUMMARY
A. Section Includes

1. All piping systems, components, and accessories.

1.2 QUALITY ASSURANCE
D. Reference Standards: see Part 2 - Products

1.3 SUBMITTALS
G. Shop Drawings

1. See Section 01340 for submittal requirements.

2. Method of connections to existing piping.

3. Product technical data showing compliance with specifications. a. Pipe
b. Fittings
c. O-rings and gaskets
d. Insulation and heat tracing
e. Other components

4. Piping pressure test date notification and test results.

5. Manufacturer’s product data for all devices and appurtenances a. Manufacturer’s certification for proposed application for fabricated pipe restraints H. Operation and Maintenance Manuals

8. See Section 01340 for:
a. The submittal process
b. The submittal contents

8.4 DELIVERY AND HANDLING
I. Protect pipe during transit and handling per manufacturer’s recommendations J. Repair damage to pipe per manufacturer’s recommendations. Replace pipe which cannot be repaired satisfactorily.

PART 2 – PRODUCTS

2.9 ACCEPTABLE MANUFACTURERS
15060
A. The following manufactures are acceptable subject to compliance with the specifications:

1. Quick connect couplings:
a. Kamlock, Dixon, or equal

2. Insulating unions:
a. Epco, or equal

3. Pipe supports:
a. Anvil, or equal

4. Pressure and temperature gages
a. Ametek, Ashcroft, or equal

5. Pipe insulation
a. Manville Corporation, or equal

6. Heat tracing
a. Tyco, or equal

2.10 PIPING COMPONENTS
G. Quick connect couplings

1. Couplings:
a. Tank truck flanged adaptor
b. Aluminum
c. 4 inch: Aluminum cap, Kamlok 633LAS, Dixon Adapter Flange, or equal d. 6 inch: Aluminum cap, threaded aluminum fitting, PVC or Cast Iron threaded 150# flange
H. Reducers

7. As required to mate pipe to equipment connections
I. Coating and linings:

4. As specified in pipe schedules and Section 09900

5. Provide for pipe, fittings, and appurtenances.

J. Insulating flanges and unions:

1. Flanges:
a. Dielectric gasket with insulating washers
b. Flat faced
c. Rated for 175 psi, 210 Deg F.

2. Unions:
a. Threaded
b. Rated for 175 psi, 210 Deg F.
c. Dielectric gaskets
K. Flexible couplings

3. Stainless steel with liners

4. Restraining bolts except for natural gas piping.

5. Suitable for pressure rating of piping system
O. Pipe transitions for differing pipe and sizes

1. Adapters and special connections pieces as required

2. All pipe transition fittings restrained
15060
P. Pressure gages
Q. Temperature gages

2.3 PIPE
A. Steel pipe

1. Pipe
a. Pipe: ASTM A53, Type B, galvanized where indicated in pipe schedules b. Fittings: ASTM A234, ASME B16.3
c. Flanges: ANSI B16.5 Class 150, flat faced, slip-on.
d. Nuts and bolts: Zinc galvanized steel, ASTM A307, threaded per ANSI B1.1, with ends projected ¼ IN beyond nuts
e. Gaskets: Butyl or EDPM

2. Manufactured units
a. Flanged coupling adaptors

1. Romac RFCA, or equal

2. Same pressure rating as piping system
b. Compression sleeve couplings

1. ROMAC 400 RG Restraint Coupling, or equal

2. Same pressure rating as piping system

3. Fabrication
a. Schedule 40
b. 1.0 or greater radius of bend to diameter or pipe.
c. Field paint pipe per Section 09900

4. Lining and coating – see pipe schedules

5. Installation
a. Install per manufacturer’s instructions
b. Flange joints

1. Maximum tolerance for flange face from normal to pipe axis: 0.005 IN per foot of pipe diameter

2. Coordinate bolt drilling locations with piping, valves, and equipment. c. Welded joints

1. Welding to conform with ANSI B31.3

2. Weldolets allowed for 5 IN and larger piping.

B. Stainless steel pipe

1. Pipe
a. Pipe: ASTM A778, Type 304L
b. Fittings: ASTM A774, ANSI B36.19
c. Flanges: ASTM 182, Grade 304L, Class 150.
d. Nuts and bolts: Type 316, threaded per ANSI B1.1, with ends projected ¼ IN beyond nuts
e. Gaskets: EDPM

2. Manufactured units
a. Flanged coupling adaptors

1. ROMAC RFCA, or equal

2. Same pressure rating as piping system
b. Compression sleeve couplings
15060

1. ROMAC 400 RG Restraint Coupling, or equal

2. Same pressure rating as piping system

3. Fabrication
a. Schedule 10S
b. 1.0 or greater radius of bend to diameter or pipe.

4. Lining and coating – see pipe schedules

5. Installation
a. Install per manufacturer’s instructions
b. Flange joints

1. Maximum tolerance for flange face from normal to pipe axis: 0.005 IN per foot of pipe diameter

2. Coordinate bolt drilling locations with piping, valves, and equipment. c. Welded joints

1. Welding to conform with ANSI B31.3

2. Weldolets allowed for 5 IN and larger piping.

C. Ductile iron pipe

1. Pipe
a. Pipe: AWWA C115, C151
b. Pressure Class: minimum 250
c. Fittings and Flanges: AWWA C110, C115
d. Flanges drilled and faced per ANSI B16.1
e. Exposed nuts and bolts: Zinc galvanized steel, ASTM A307, threaded per ANSI B1.1, with ends projected ¼ IN beyond nuts
f. Buried nuts and bolts: 304 stainless steel.
f. Gaskets: Grade 1 rubber, ANSI B1.21
g. Buried pipe:
i. Polyethylene encased per AWWA C105
ii. Push on or mechanical joint as scheduled
iii. Restrained joints unless otherwise shown in pipe schedules or drawings h. Minimum .25 IN wall thickness.

2. Manufactured units
a. Flanged coupling adaptors

1. ROMAC RFCA, or equal

2. Same pressure rating as piping system

3. Grade 30 rubber gaskets
b. Compression sleeve couplings

1. ROMAC 400 RG Restraint Coupling, or equal

2. Same pressure rating as piping system

3. Grade 30 rubber gaskets

3. Fabrication
a. Field paint exposed pipe per Section 09900

4. Lining and coating – see pipe schedules

5. Installation
a. Install per AWWA C600 and manufacturer’s instructions b. Flange joints

1. Maximum tolerance for flange face from normal to pipe axis: 0.005 IN per foot of pipe diameter

2. Coordinate bolt drilling locations with piping, valves, and equipment. c. Install bonding jumpers on buried piping
15060
D. Copper tubing

1. Pipe
a. Exposed pipe: ASTM B88, Type L, hard
b. Buried pipe: ASTM B88, Type K
c. Fittings: ANSI B16.22
d. Soldering and brazing:

1. Buried pipe: Silver solder per AWS 5.8

2. Exposed pipe: ASTM B32 solder, 95/5 tin/antimony ratio. e. Unions: copper, ground joint
f. Field paint pipe per Section 09900
E. PVC pipe – pressure and PVC pipe- secondary chemical containment

1. Pipe
a. Pipe: ASTM D1784, Type 1, Grade 1, Schedule 40
b. Fittings: ASTM D2467, socket type with the same pressure and temperature rating as the pipe.
c. Flanges: 150 LB socket type PVC.
d. Nuts and bolts: 316 stainless steel with ends projected ¼ IN beyond nuts e. Gaskets: Natural rubber.

2. Installation
a. Socket weld pipe 2 IN and less. (Orange chemical-resistant industrial cement required for secondary containment piping)
b. Socket weld or flange pipe larger than 2 IN. (Orange chemical-resistant industrial cement required for secondary containment piping)
c. Flanges or unions where shown.
d. Field threading not allowed.
e. Field paint pipe per Section 09900- All PVC pipe that will be exposed to direct sunlight to be wrapped in 20 mil tape in lieu of painting. Yellow 20 mil tape to be used for secondary containment piping.

F. CPVC pipe – chemical piping and where indicated

1. Pipe
f. Pipe: ASTM D1785, Type 1, Grade 1, Schedule 80, grey in color g. Fittings: ASTM D2467, socket type with the same pressure and temperature rating as the pipe.
h. Flanges: 150 LB socket type PVC.
i. Nuts and bolts: 316 stainless steel with ends projected ¼ IN beyond nuts j. Gaskets: FKM Viton or equal.
h. Flanged Coupling Adapters:

1. Romac PVC RFCA, ductile iron body, or equal

2. Same pressure rating as piping system

3. Restraining bolts, set screw or lugs

4. SBR gaskets

2. Installation
f. Socket weld pipe 2 IN and less. Orange chemical-resistant industrial cement is required. g. Socket weld or flange pipe larger than 2 IN.
h. Flanges or unions where shown.
i. Field threading not allowed.
j. All CPVC piping that will be exposed to direct sunlight to be wrapped entirely in yellow 20-mil tape in lieu of painting.
15060
G. PVC pipe – force mains and sewers

1. AWWA C900, 4 in. through 12 in.

2. AWWA C905, 14 in. through 48 in.

3. Standard 20 foot laying lengths

4. Class 200 pressure rating unless otherwise scheduled

5. Fittings: Ductile iron AWWA 110, concrete lining as specified for ductile iron pipe a. High deflection couplings not allowed
b. Minimum 350 psi working pressure
c. Restrained fittings connector:
i. Push- On: EBAA Megalug, Romac Romagrip, or equal
ii. Mechanical Joint: EBAA 15MJ00 Split Serrated Restraint, Romac Gripring, or equal
iii. As recommended by manufacturer
b. Transition Couplings
i. Mechanical Joint Long Sleeve AWWA C110 or AWWAC153
ii. Located within restrained areas: ECCA Megalug 2000 (PVC) and EBBA 1100 (DIP), or equal

6. For Force Mains provide restrained system for bell and spigot PVC pipe joints a. Restrained Joints shall be provided by a clamping ring and an additional ring designed to seat on the bell end of the pipe.
b. The rings shall be connected with T-Head bolts or rods. c. Restraining devices shall provide full (360 degree) support around the circumference of the pipe.
d. No point loading shall be permitted.
e. Restraint of mechanical joint fittings shall be provided by a clamping ring installed on the PVC pipe and connected to the mechanical joint fitting with T-Head bolts or rods. f. Restraining devices shall meet or exceed the requirements of ASTM F-1674 or UNI-Bell B-13 "Recommended Standard Performance Specification for Joint Restrainers for Use with PVC Pipe."
g. All buried steel parts shall be sand blasted in accordance with the coating manufacturer's technical data sheet for "submerged" service and coated with a two coat epoxy. Epoxy shall be Tnemac Series 66 or equal.
h. All bolts and tie rod materials shall be either high strength cast iron containing a minimum of 0.5% copper or high-strength, low alloy steel, as specified in AWWA C-111 for buried mechanical joints.

H. Corrugated Metal Pipe

1. Pipe:
a. Pipe: Aluminized Steel, Type 2 pipe, ASTM A929 and AASHTO M-275, 2 and 2/3rds Inch by ½ Inch corrugations, or match existing.
b. Minimum Thickness: .075 Inch; ASTM A260 and AASHTO M36.

2. Fittings:
a. As shown on drawings
b. Flared end sections shall be provided in corrugated metal pipe culverts where shown on drawings.

2.4 PIPE SUPPORTS AT EXPOSED LOCATIONS
15060
A. See Drawings for pipe support types and construction B. Pipe support spacing

1. Steel and ductile iron pipe
a. 1-1/2 IN and less: 5 FT max span
b. 2 thru 4 IN: 10 FT max span
c. 5 thru 8 IN: 15 FT max span
d. 10 IN and larger: 20 FT max span

2. PVC pipe
a. 1-1/4 IN and less: 3 FT max span
b. 1-1/2 thru 3 IN: 4 FT max span
c. 4 IN and larger: 5 FT max span
C. Field paint pipe supports per Section 09900
PART 3 – EXECUTION

3.1 INSTALLATION OF BURIED PIPING
A. Provide a minimum of 30 IN of cover unless otherwise show.

B. Installation of ductile iron piping: AWWA C600
C. Do not deflect joints at fittings unless approved by Engineer

1. PVC C900: use integral bell end pipe for straight alignments and for radii greater than 1,150 feet.

D. Provide underground hazard warning tape.

1. Terra Tape, or equal
E. Provide insulating components for dissimilar pipe connections.

F. Concrete blocking on Force Mains:

1. Where shown on drawings, otherwise restrained piping

2. Bearing area as indicated on the Drawings

3. Extend from fitting to solid undisturbed earth

4. Installed so joints are accessible for repair

5. If adequate support against undisturbed earth cannot be obtained, provide metal harness anchorages across the joint and secure by anchoring to the pipes or fittings or other anchorage facilities as required for adequate support

6. If the lack of a solid vertical excavation face is due to improper excavation, all excess costs shall be borne by Contractor

7. Maintain all joints, nuts and bolts free of concrete F. Corrugated Metal Pipe

1. Per Manufacturers recommendations
15060
G. Protection for Buried Flanges

1. Ductile Iron Pipe: Polyethylene encased per AWWA C105, without tears or openings, sealed around flanges, couplings, and buried valves
a. Securely terminated and sealed at connections to other pipe materials

2. Where not encased in polyethylene tube.
a. All buried, flanged non stainless steel ferric piping surfaces such as flanged valves, flanged couplings, flanged coupling adapters, and flange to flange connections, shall be wrapped with petrolatum wax tape coating in accordance with AWWA C-217. c. Alternative manufactured tape and coating products will be allowed subject to approval of Engineer.
d. The fittings and bolts surfaces shall be primed with a blend of petrolatum, plasticizer, insert fillers, and corrosion inhibitor having a paste-like consistency. e. Filling covering material shall be a synthetic felt tape, saturated with a blend of petrolatum plasticizers, and corrosion inhibitors that is easily formable over irregular surfaces.
f. The primed and wax-tape wrapped fitting shall be wrapped with plastic tape covering consisting of 1.5 mil, polyvinylidene chloride or metallocene resin material. The tape shall have high dielectric strength, be stretchable and be able to conform well to irregular shapes.

3. All pipe sections shall be fully inspected by the Engineer before the pipe is backfilled.

3.2 INSTALLATION OF EXPOSED PIPING
A. Support pipe as detailed on drawings and as specified herein.

B. Bushings not allowed for pipe reductions.

C. Pipe stuffing box leakage to floor drain
D. Equipment piping connections

1. Install pipe in a manner to minimize stresses on equipment flanges.

3.3 CONNECTIONS TO EXISTING PIPING
A. Provide appropriate pipe fittings
B. Make connections in a timely manner
C. Working with Asbestos Cement Pipe per Section 02072, Demolition, Cutting, and Patching

3.4 ACCESS
A. Provide adequate access doors or panels to service piping

3.5 PIPE TESTING
A. Contractor to test pipe for time periods and pressures in piping schedules B. Zero leakage rate allowed, unless otherwise specified. 15060
C. Test pipe before painting, insulation, and prior to backfillling.

D. Provide 24 hours notice before testing
E. Provide a written test report
F. Repair and retest all pipe that fails pressure test.

G. Pipe Testing for Sewer Pipe

1. Test with low pressure air per ASTM F-1417

3.6 DEFLECTION TESTING
A. Deflection Testing by Mandrel

1. For all new buried sewer pipe

2. By Contractor

3. Per ASTM D3034 and F679

3.6 PIPING SCHEDULES
A. See attached

END OF SECTION
15060
SECTION 15070

THERMOPLASTIC PROCESS PIPE
PART 1 - GENERAL

1.5 SUMMARY
A. Section Includes:

1. PVC pipe.

2. CPVC pipe.

3. Polyethylene (PE) pipe.

4. Double containment PVC pipe.

5. Fittings.

6. Accessories for plastic piping.

1.6 REFERENCE STANDARDS
A. American Water Works Association:

1. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings.

2. AWWA C900 - Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 In. through 12 In., for Water Transmission and Distribution.

3. AWWA C901 - Polyethylene (PE) Pressure Pipe and Tubing, 1/2 In. (13 mm) through 3 In. (76 mm), for Water Service.

4. AWWA C906 - Polyethylene (PE) Pressure Pipe and Fittings, 4 In. (100 mm) through 63 In. (1,600 mm), for Water Distribution and Transmission.

B. ASME International:

1. ASME B1.1 - Unified Inch Screw Threads (UN and UNR Thread Form).

2. ASME B1.20.1 - Pipe Threads, General Purpose (Inch).

3. ASME B16.1 - Cast Iron Pipe Flanges and Flanged Fittings, Classes 25, 125, 250 and 800.

4. ASME B16.5 - Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24 Metric/Inch Standard.

5. ASME B16.20 - Metallic Gaskets for Pipe Flanges: Ring-Joint, Spiral-Wound, and Jacketed.
15060

6. ASME B16.21 - Nonmetallic Flat Gaskets for Pipe Flanges.

7. ASME B31.3 - Process Piping.

C. ASTM International:

1. ASTM A193/A193M - Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications.

2. ASTM A194/A194M -Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both.

3. AST

4. ASTM D1784 - Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds.

5. ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.

6. ASTM D2447 - Standard Specification for Polyethylene (PE) Plastic Pipe, Schedules 40 and 80, Based on Outside Diameter.

7. ASTM D2464 - Standard Specification for Threaded Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80.

8. ASTM D2466 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40.

9. ASTM D2467 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80.

10. ASTM D2564 - Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems.

11. ASTM D2609 - Standard Specification for Plastic Insert Fittings for Polyethylene (PE) Plastic Pipe.

12. ASTM D2657 - Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings.

13. ASTM 2665 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings

14. ASTM D2683 - Standard Specification for Socket-Type Polyethylene Fittings for Outside Diameter-Controlled Polyethylene Pipe and Tubing.

15. ASTM D2737 - Standard Specification for Polyethylene (PE) Plastic Tubing.

16. ASTM D2837 - Standard Test Method for Obtaining Hydrostatic Design Basis for Thermoplastic Pipe Materials or Pressure Design Basis for Thermoplastic Pipe Products.

17. ASTM D2855 - Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings.

18. ASTM D3035 - Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Controlled Outside Diameter.

19. ASTM D3139 - Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals.

20. ASTM D3222 - Standard Specification for Unmodified Poly(Vinylidene Fluoride) (PVDF) Molding Extrusion and Coating Materials.

21. ASTM D3261 - Standard Specification for Butt Heat Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing.

22. ASTM D3350 - Standard Specification for Polyethylene Plastics Pipe and Fittings Materials.

23. ASTM D3892 - Standard Practice for Packaging/Packing of Plastics.

24. ASTM F402 - Standard Practice for Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings.

25. ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe.
15060

26. ASTM F656 - Standard Specification for Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings.

27. ASTM F714 - Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Outside Diameter.

28. ASTM F876 - Standard Specification for Crosslinked Polyethylene (PEX) Tubing.

29. ASTM F1055 - Standard Specification for Electrofusion Type Polyethylene Fittings for Outside Diameter Controlled Polyethylene and Crosslinked Polyethylene (PEX) Pipe and Tubing.

30. ASTM F1056 - Standard Specification for Socket Fusion Tools for Use in Socket Fusion Joining Polyethylene Pipe or Tubing and Fittings.

31. ASTM F1290 - Standard Practice for Electrofusion Joining Polyolefin Pipe and Fittings.

D. NSF International:

1. NSF 61 - Drinking Water System Components - Health Effects.

2. NSF 372 - Drinking Water Systems Components - Lead Content.

1.7 COORDINATION
A. Coordinate Work of this Section with piping and equipment connections specified in other Sections and indicated on Drawings.

1.8 SUBMITTALS
A. Section 01340 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer's catalog information regarding pipe and fittings.

C. Shop Drawings: Indicate layout of piping systems, including equipment, critical dimensions, sizes, and materials lists.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Delegated Design Submittals: Submit signed and sealed Shop Drawings with design calculations and assumptions for pipe sizes and sizing methods and calculations for piping systems designed by Contractor or Manufacturer.

F. Source Quality-Control Submittals: Indicate results of factory tests and inspections.

G. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

H. Qualifications Statements:

1. Submit qualifications for manufacturer, installer, and licensed professional.

2. Submit manufacturer's approval of installer.
15060

1.9 CLOSEOUT SUBMITTALS
A. Section 01720 - Execution and Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of piping, valves and other appurtenances, connections, and invert elevations.

C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.

1.10 QUALITY ASSURANCE
A. Permanently mark each length of pipe with manufacturer's name or trademark and indicate conformance to standards.

B. Materials in Contact with Potable Water: Certified according to NSF 61 and NSF 372.

1.11 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' experience.

B. Installer: Company specializing in performing Work of this Section with minimum three years' experience.

1.12 DELIVERY, STORAGE, AND HANDLING
A. Inspection:

1. Accept materials on Site in manufacturer's original packaging and inspect for damage.

2. Manufacturer's Packaging: Comply with ASTM D3892.

B. Store materials according to manufacturer instructions.

C. Protection:

1. Protect materials from puncture, abrasion, moisture, dust, and UV by storing in clean, dry location remote from construction operations areas.

2. Protect piping and appurtenances by storing off ground.

3. Prevent the intrusion of dirt debris and animals by providing pipe with covers over the ends.

4. Provide additional protection according to manufacturer instructions. 15060

1.13 AMBIENT CONDITIONS
A. Minimum and Maximum Temperatures: Do not install pipe when temperature is below 40 degrees F or above 90 degrees F if pipe is exposed to direct sunlight.

B. UV Protection: Provide pipe installed above ground or outside with UV protection.

1.14 EXISTING CONDITIONS
A. Field Measurements:

1. Verify field measurements prior to fabrication.

2. Indicate field measurements on Shop Drawings.

PART 2 - PRODUCTS

2.1 PVC PIPE AND FITTINGS
A. PVC Pipe and Fittings:

1. Pipe:
a. Comply with ASTM D1785.
b. Schedule: 40 or 80, as specified in Pipe Schedule

2. Joints:
a. As specified in Pipe Schedule
B. PVC Pipe and Fittings:

1. Pipe:
a. Comply with AWWA C900.
b. As specified in Pipe Schedule

2. Fittings:
a. Material: Ductile iron.
b. Comply with AWWA C110 for standard fittings and AWWA C153 for compact fittings.

3. Joints:
a. Joints shall be as specified in the Pipe Schedule
b. Push-on rubber gasketed type joints shall be in accordance with applicable requirements of AWWA C111.
c. Restrained Joints:
1) Restrained joint PVC pipe shall be externally restrained, including encased pipe.
15060
2) Joint restraints for PVC bell joints shall consist of a split serrated ring installed on the plain end pipe and behind the bell. A sufficient number of restraining rods shall be used to connect the bell ring and the gripping ring. The combination of the restraints and fasteners shall have a pressure rating to the full pressure rating of the pipe. The restraint shall be Series 1600, as manufactured by EBAA Iron, Inc., Series 1390 as manufactured by The Ford Meter Box Company, or approved equal.
3) Joint restraints for PVC at ductile mechanical and Push-on fittings shall consist of a split serrated ring installed on the plain end pipe. A sufficient number of restraining rods shall be used to connect the gripping ring to the ductile iron fitting. The combination of the restraints and fasteners shall have a pressure rating to the full pressure rating of the pipe. The restraint shall be Series 1300 as manufactured by The Ford Meter Box Company, or approved equal.
4) Restrained joint fittings and the restraining components shall be Ductile Iron in accordance with applicable requirements of AWWA C110 and/or C153.

Push-on joints for such fittings shall be in accordance with AWWA C111. 5) All joint restraint shall be through the use of restrained joints; thrust blocks shall not be permitted.

4. Materials:
a. Comply with ASTM D1784.
b. Minimum Cell Classification: 12454

2.2 CPVC Pipe
A. CVPC Pipe and Fittings

1. Pipe
a. Type IV, Grade I Chlorinated Polyvinyl (CPVC) compound b. Cell Classification of 23447 per ASTM D1784
c. Manufactured per ASTM F441
d. National Sanitation Foundation (NSF) seal of approval for potable water applications.

2.3 PE PIPE AND FITTINGS
A. PE Pipe and Fittings:

1. Pipe: AWWA C906.
a. Dimension Ratio: As specified in Pipe Schedule.

2. Fittings:
a. Comply with AWWA C906.
b. Type: Molded

3. Joints: As specified in Pipe Schedule.

4. Materials:
a. Comply with AWWA C906.
15060
B. PE Tube and Fittings:

1. Tube:
a. Comply with AWWA C901.
b. Size and Wall Thickness:
1) As indicated on Drawings.
2) Comply with ASTM F876.

2. Fittings:
a. Type: Compression.
b. Materials: Suitable for application.

3. Threads:
a. Type: Straight.
b. Comply with ASME B1.1.

2.4 DOUBLE CONTAINMENT PIPE AND FITTINGS
A. Double Containment PVC Pipe and Fittings:

1. Pipe:
a. PVC containment pipe and PE tube carrier pipe.
b. PVC containment pipe and CPVC carrier pipe.
c. Rating/Schedule: As specified in Pipe Schedule

2. Joints: As specified in Pipe Schedule

2.5 A.

FINISHES
Coat machined faces of metallic flanges with temporary rust-inhibitive coating.

2.6 A.

ACCESSORIES
PVC Piping:

1. Flange Bolting:
a. Hex-Head Bolts: Stainless steel; ASTM A193 Grade B8M Class 2. b. Hex-Head Nuts: Stainless steel; ASTM A194 Grade B8M Class 2.

2. Flange Gaskets:
a. Type: Full-faced.
b. Material: FKM.
c. Comply with ASME B16.21.

3. Solvent Cement:
a. Comply with ASTM D2564.
b. Primers: Comply with ASTM F656.

B. PE Piping:

1. Insert Fittings: Comply with ASTM D2609.
15060

2. Couplings: Comply with ASTM F1055.

3. Flange Bolting:
a. Hex-Head Bolts: Stainless steel; ASTM A193 Grade B8M Class 2. b. Hex-Head Nuts: Stainless steel; ASTM A194 Grade B8M Class 2.

4. Flange Gaskets:
a. Type: Full faced.
b. Material: FKM.
c. Comply with ASME B16.21.

2.7 RECYCLED WATER
A. Recycled water pipelines shall comply with the requirements of drinking water pipelines with the exceptions noted for color and markings.

1. All PVC and HDPE pipe carrying recycled water shall be purple or wrapped with purple identification tape and clearly labeled as recycled water. Purple pipe and identification tape shall match APWA color coding, Pantone 512.

2. Underground pipe markers and tracer wire shall be purple and conform to Section 10400

2.8 SOURCE QUALITY CONTROL
A. Section 014000 - Quality Requirements: Requirements for testing, inspection, and analysis.

B. Provide shop inspection and testing of completed pipe sections.

C. Certificate of Compliance:

1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.

2. Specified shop tests are not required for Work performed by approved manufacturer.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Section 01720 - Execution and Closeout Requirements: Requirements for installation examination.

B. Verify that field dimensions are as indicated on Shop Drawings.

C. Inspect existing flanges for nonstandard bolt hole configurations or design, and verify that new pipe and flange mate properly.
15060

3.2 PREPARATION
A. Section 017000 - Execution and Closeout Requirements: Requirements for installation preparation.

B. Ream pipe and tube ends, remove burrs, and bevel plain-end pipe.

C. Thoroughly clean pipe and fittings before installation.

D. Cleaning: Clean surfaces to remove foreign substances.

3.3 INSTALLATION
A. Comply with ASME B31.3.

B. Run piping straight along alignment as indicated on Shop Drawings, with minimum number of joints.

C. Fittings:

1. According to manufacturer instructions.

2. Gaskets:
a. Clean seats thoroughly.
b. Wipe gaskets clean prior to installation.

3. Tighten bolts progressively, drawing up bolts on opposite sides until bolts are uniformly tight; use torque wrench to tighten bolts to manufacturer instructions.

D. Provide required upstream and downstream clearances from devices as indicated.

E. Install piping with sufficient slopes for venting or drainage of liquids and condensate to low points.

F. Support exposed piping as specified in Section 15090 G. Provide expansion joints as specified
H. Disinfection: Disinfect potable-water piping
I. Field Cuts: According to pipe manufacturer instructions.

J. Joining:

1. Heat Joining: Comply with ASTM D2657.

2. Electrofusion: Comply with ASTM F1290.

3. Primers and Cleaners: Comply with ASTM F402.
15060

4. PVC Solvent-Cemented Joints: Comply with ASTM D2855.

K. Insulation: As indicated on Shop Drawings.

L. Underground Piping: As specified in Section 15060

3.4 TOLERANCES
A. Section 01400 - Quality Requirements: Requirements for tolerances.

3.5 FIELD QUALITY CONTROL
A. Section 01400 - Quality Requirements: Requirements for inspecting and testing.

B. Inspection:

1. Inspect for piping defects that may be detrimental as determined by the Engineer.

2. Repair damaged piping, or provide new, undamaged pipe.

3. After installation, inspect for proper supports and interferences.

C. Pressure Testing:

1. Test Pressure: As specified in Piping Schedules or per piping manufacturer.

3.6 CLEANING
A. Section 01710 - Execution and Closeout Requirements: Requirements for cleaning.

B. Keep pipe interior clean as installation progresses.

C. Clean pipe interior of soil, grit, shavings, and other debris after pipe installation.

3.7 PIPING SCHEDULES
A. Potable Water

1. PVC Buried 3 IN and Below
a. Schedule 80
b. Piping: ASTM 1784
c. Fittings: ASTM D2647
d. Socket Welded
e. Valves: Ball
f. Gaskets and O rings: EDPM
g. Testing
1) Water
a) 100 psig
B. Non-Potable Water

1. PVC Buried 3 IN and Below
15070
a. Schedule 80
b. Piping: ASTM 1784
c. Fittings: ASTM D2647
d. Socket Welded
e. Valves: Ball
f. Gaskets and O rings: FKM
g. Testing
1) Water – Purple Pipe
a) 120 psig
C. Chemical (Sodium Hypochlorite)

1. PVC Buried 3 IN and Below
a. Schedule 80
b. Piping: ASTM 1784
c. Fittings: ASTM D2647
d. Socket Welded
e. Valves: Ball
f. Gaskets and O rings: FKM
g. Testing
1) Water
a) 100 psig

2. CPVC Exposed to 6 IN
a. Schedule 80
b. Grade 14
c. Piping: ASTM 1785, ASTM F441, ASTM D543, ISO 22088
d. Fittings: ASTM F1970, ASTM F493
e. Socket Welded
f. Valves: Ball
g. Gaskets and O rings: FKM
h. Testing
1) Water
a) 100 psig
i. Wrap exposed exterior surfaces in 20-mil yellow tape j. FKM Gaskets and O-Rings per AWWA C605

3. Double Contained Piping
a. CPVC containment piping
1) Schedule 40
2) Grade 18
3) ASTM 1784 & 1785, ASTM F441, ASTM D543, ISO 22088
4) Fittings: ASTM F1970, ASTM F494
5) Solvent-Welded
6) 150 lb socket-welded CPVC fittings
b. CPVC or PE/PEX carrier piping
1) Schedule 80/SDR 9
2) SW/Compression Fittings
c. PFA Carrier Piping:
15070
1) ASTM D 6867-03 and ASTM D 3307
2) Flared end w/ PVDF Threaded Tube Nuts
3) PFA Fittings
d. Valves: NA
e. Gaskets and O rings: FKM
f. Testing: test carrier pipe only 125 psi
g. Paint exposed exterior surfaces of Containment Pipe

END OF SECTION
15090
SECTION 15090

PIPE SUPPORTS
PART 1 - GENERAL

1.01 SUMMARY
A. The work of this Section includes designing and providing pipe supports, hangers, guides, and anchors.

B. Related Sections: The work of the following Sections applies to the work of this Section.

Other Sections of the Specifications, shall also apply to the extent required for proper performance of this work.

1.02 REFERENCES
A. This section contains references to some or all of the following documents, most recent edition. They are a part of this section as specified and modified. In case of conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail.

Reference Title
ANSI/MSS SP-58 Standard Pipe Support Components

1.03 SYSTEM DESCRIPTION
A. Design Requirements

1. More stringent of
a. California Building Code
b. Applicable National Code

2. Supports shall be capable of supporting the pipe for all service and testing conditions.

3. Supports shall allow free expansion and contraction of the piping throughout the full operating temperature range to prevent excessive stress.

4. Supports and hangers shall be designed to allow for proper pitch of pipes.

5. For chemical and waste piping, design, materials of construction and installation of pipe hangers, supports, guides, restraints, and anchors shall meet the following standards, except as modified by this Specification:
a. ANSI B31.3
b. MSS SP-58 and SP-69
15090

6. For hot and cold water piping, design, materials of construction and installation of pipe hangers, supports, guides, restraints, and anchors shall meet the following:
a. ANSI B31.1
b. MSS SP-58 and SP-69

7. All physical clearances between piping, support system and structure shall be checked and the supports shall allow for vertical adjustment after erection.

8. Vertical pipe runs in pipe chases shall be supported at base of riser. Pipes shall be supported for lateral movement with clamps or brackets.

9. Galvanized 20-gauge steel pipe saddle shall be provided for plastic support points to ensure minimum contact width of 4 inches.

10. Pipe Support Spacing
a. General
1) For conditions not detailed on the drawings, Contractor is responsible for a complete pipe support system.
2) Pipe supports shall be designed by the Contractor. In all cases pipe supports shall not exceed maximum spacing scheduled unless otherwise shown.
3) All piping shall be supported to prevent undue strain on any valve, fitting or piece of equipment.
4) Locations
a) All changes in direction
b) All changes in elevation
c) Adjacent to flexible couplings
d) At least one support shall be provided for each length of pipe and each valve
b. Each length and every fitting shall be supported as follows:
1) Bell and spigot piping
a) At least one hanger
b) Applied at bell
c) Compression sleeve joints:
d) Hanger shall be within 2 feet of each side of fittings to keep pipes in alignment.
15090
c. Supports shall be spaced for soil and waste pipe and other piping systems not included above every 5 feet.
d. Continuous support shall be provided for nylon tubing

1.04 SUBMITTALS
A. The Contractor shall provide submittals as required hereunder.

1. Shop drawings for all fabricated pipe supports

2. If there are locations where the Contractor deviates from the pipe supports shown on the Contract Drawings; including details of concrete inserts, the Contractor shall submit a drawing showing the deviations.

B. Submit pipe support design calculations, including seismic calculations as follows in this section.

PART 2 - PRODUCTS

2.01 MATERIALS
A. Pipe supports shall be fabricated from the following materials:

1. Stainless steel (Type 304L or 316L):
a. Use in all submerged locations or in tanks above the water level but below the top of the structure and where specifically indicated on the Drawings.

2. Hot-dip galvanized steel:
a. Use in areas other than above or where specifically indicated on the Drawings.
b. Hot-dip galvanize pipe supports after fabrication.

3. Plastic, FRP and Other Miscellaneous Materials:
a. Use where indicated on the Drawings.

2.02 MANUFACTURED UNITS
A. Products listed in this section refer to products manufactured by Anvil International.

Equivalent units manufactured by Tolco, B-Line, or equal, may be substituted.

B. Supports and Anchors

1. For exposed, non-submerged conditions, hot-dipped galvanized steel shall be used.

2. For submerged conditions, stainless steel, Type 304L, shall be used except as noted.

C. Contact between dissimilar metals shall be prevented by the use of copper plated, rubber, vinyl coated, or stainless steel hangers or supports.
15090
D. Modular Framing Strut Systems and Accessories for Pipe Support

1. Galvanized steel or stainless steel as specified

2. 12-gauge channels

3. Unistrut, Globestrut, Anvil-strut, Powerstrut, or equal PART 3 - EXECUTION

3.01 INSTALLATION
A. Piping systems exhibiting pulsation, vibration, swaying, or impact shall be provided with suitable constraints to correct the condition. Included in this requirement are movements from:

1. Trap discharge

2. Water hammer

3. Similar internal forces
B. Weld Supports

1. AWS D1.1

2. Anchors shall be welded to pipe in accordance with ANSI B31.3 C. Piping and pipe supports shall be located so as to not interfere with open accesses, walkways, platforms, and with maintenance or disassembly of equipment.

D. Hangers shall be inspected for:

1. Design offset

2. Adequacy of clearance for piping and supports in the hot and cold positions

3. Guides to permit movement without binding

4. Adequacy of anchors
E. Hangers shall be inspected after erection of piping systems and prior to pipe testing and flushing.

F. Individual or continuous slot concrete inserts for use with hangers for piping and equipment shall be installed as concrete forms are installed.

G. Field painting shall comply with Section 09 90 00 – Coatings.

H. All piping shall be braced for seismic forces in accordance with CBC.

END OF SECTION
15100
SECTION 15100
VALVES
PART 1 – GENERAL

1.4 SUMMARY
B. Section Includes

2. Valves, valve actuators, and valve appurtenances.

1.5 QUALITY ASSURANCE
E. Reference Standards: see Part 2 – Products, and The American Society for Testing and Materials (ASTM)

1.6 SUBMITTALS
I. Shop Drawings

6. See Section 01340 for submittal requirements.

7. Product technical data showing compliance with specifications. f. Pressure and temperature rating
g. Materials of construction
h. Dimensions and weight
i. Flow coefficients
j. Electrical and control diagrams
J. Operation and Maintenance Manuals

1. See Section 01340 for:
c. The submittal process
d. The submittal contents
PART 2 – PRODUCTS

2.11 MATERIALS

1. All valve construction, material, and pressure ratings shall be selected to suit the system in which installed. Pressure rating and manufacturer’s name shall be cast on each valve body. Where specified, valves shall be supplies fully packed with Teflon impregnated packing. Where possible, valves shall be of one manufacturer.

2. Stems of all bronze valves shall be silicon bronze or similar alloy to prevent de-zincification.

Alloy shall have minimum tensile strength of 60,000 psi, minimum yield point of 24,000 psi per ATSM B584.
15100

2.12 ACCEPTABLE MANUFACTURERS
B. The following manufactures are acceptable subject to compliance with the specifications:

7. Gate valves
a. Mueller, CLOW, Crane, or equal

8. Plug valves:
b. Non-lubricated: DeZurik, Millikin, Homestead, Pratt, Val-Matic, M&H, or equal c. Lubricated: Millikin, Homestead, or equal

9. Ball valves:
b. Nibco, Watts, or equal

10. Check valves:
a. CLOW, Mueller, Val-Matic, or equal

11. Butterfly valves:
b. Pratt, Dezurik, Millikin, or equal

12. Air-Relief/ Vaccum Valves
a. Val-Matic, DeZurik (APCO), GA, or equal

13. Altitude Valves
a. Cla Val or equal

14. Sodium Hypochlorite Ball Valves
b. Spears or equal

2.13 GATE VALVES
L. 2-1/2 IN and smaller

2. Class 125 bronze

3. Pressure rating:
a. Steam: 125 psi
b. Water: 300 psi non-shock WOG

4. MSS SP-80

5. Materials:
e. Body, bonnet, wedge: bronze
f. Stem: silicon bronze
g. Packing: Teflon
M. 3 IN and larger

1. AWWA C509 or C515

2. Class 125 iron body

3. Pressure rating:
a. Steam: 125 psi to 400 Deg F
b. Water: 300 psi WOG

4. MSS SP-70

5. Materials:
a. Body, bonnet, wedge: cast iron
b. Stem: brass
c. Packing: Teflon
d. Epoxy coated

2.14 PLUG VALVES
A. Non-Lubricated (wastewater and sludge applications)

1. 175 psi working pressure
15100

2. Minimum 80% of full pipe port area

3. Valve body fitted with bolted bonnet

4. Adjustable and replaceable stem seal without disassembly of valve or bonnet

5. Drip tight seal

6. Actuator
a. Oil bath with seals for actuator gearing
b. Valve position indicator
c. Adjustable stop

7. Materials:
a. Body: cast iron, ASTM A126, Class B
b. Plug: ductile iron, ASTM A536 65-45-12
c. Plug facing: Neoprene, or Buna-N, 70 Type A durometer hardness d. Shaft bearing bushing: TFE
e. Valve seats: welded in overlay, 90% nickel, 1/8 IN minimum thickness f. Stem seal: Nitrile butadiene packing
g. Eccentric type
B. Lubricated (natural gas applications)

1. 200 psi working pressure

2. Minimum 80% of full pipe port area

3. Suitable to local gas company

4. Valve body fitted with bolted bonnet

5. Actuator
a. Oil bath with seals for actuator gearing
b. Valve position indicator
c. Adjustable stop

6. Materials:
a. Body: cast iron, ASTM A126, Class B
b. Plug: cast iron, ASTM A126, Class B
c. Plug facing: Teflon
d. Valve seats: gas resistant lubricant/sealant

2.15 BALL VALVES
A. 1.5”-3” Sodium Hypochlorite

1. Schedule 80 Spears 1839V-020 or equal

2. FKM Viton or equal gaskets

3. 6 spare valves must be provided to the CLMSD at the completion of the project B. ¼ IN thru 3 IN dia (potable water)

1. Pressure rating:
a. Water: 400 psi, 250 Deg F WOG

2. Three piece body

3. Repackable stuffing box

4. Renewable Teflon seats

5. No media contact with stem

6. Direction of opening indicator on handle

7. Materials:
a. Body: bronze
b. Stem: brass
c. Ball: brass, chrome plated
d. Seats: reinforced Teflon
15100
e. Handle: vinyl coated

2.16 BUTTERFLY VALVES
A. Comply with AWWA C504
B. Materials

1. Valve bodies
a. ASTM A126, Class B or ASTM A536 Grade 65-45-12 ductile iron. b. Wafer valves may be constructed of ASTM A48, Class 40 cast iron.

2. Valve shafts
a. Stainless steel, 18-8, Type 304 or 316

3. Valve discs:
a. Potable and non-potable water:
1). ASTM A48, Class 40 cast iron
2). ASTM A536, Grade 65-45-12 ductile iron
3). ASTM A436, Type 1 alloy cast iron
4). Bronze in accordance with AWWA C504

4. Valve seats: FKM

5. Mating surfaces: ASTM A276, 18-8, stainless steel or bronze C. Design Requirements

1. Seat type:
a. Resilient
b. Comply with AWWA C504

2. Exposed and submerged valves 3 through 20 IN.
a. Body type: Wafer or short body flange
b. Equip wafer type with fully tapped anchor lugs drilled per ASME B16.5.

2.17 CHECK VALVES
A. Swing check 3 IN to 6 IN

1. AWWA C508

2. Pressure rating- ANSI Class 125-150:
a. 200 psi working pressure

3. Materials:
a. Body: iron, bronze mounted
b. Seat ring: bronze
c. Disc: cast iron with bronze face
d. Hinge shaft: stainless steel
e. Bearings: bronze
f. Lever and weight

2.6 AIR-RELEASE VALVES
A. General:

1. Provide as indicated on Drawings.
15100

2. Water working pressure: 125 psi.

3. Provide a shutoff valve: plug valve.

B. Clear Water Service:

1. Individual air release valves:
a. Inlet size as indicated on Drawings.
b. GA "Figure AR," Val-Matic "Model 38," APCO "200A," or equal.

C. Waste Water Service:

1. Individual air release valves:
a. 2” Inlet.
b. GA "Figure 925 or 927, APCO "S-400," or equal.
c. Flush Accessories
1) Inlet Shut off Plug Valve
2) Blow off Valve
3) Hose and quick disconnect coupling

2.7 TAPPING SADDLES
B. A fabricated stainless steel sleeve shall be used for all connections on pipe sizes larger than 4 inch.

1. Flanges may be stainless steel or ductile iron

2. Stainless steel sleeves shall be Type 304. The bolts and nuts shall be stainless steel, Type 316.

3. Rated at minimum 200 psig

4. Romac, Mueller, Smith-Blair or equal
C. No wet taps will be allowed where the outlet is the same size as the main.

D. Fabricated steel sleeves shall have a minimum ½-inch threadolet or coupling for testing.

2.8 TAPPING VALVES
A. AWWA Standard C515
15100
B. Acceptable for use in sewage force main applications C. Designed specifically to function with wet tapping devices

1. 250 psig maximum working pressure

2. Flange by Flange of Flange by MJ

3. All MJ fittings harnessed
D. Full port resilient wedge

1. Fully encapsulated wedge
E. Ductile iron body

1. Epoxy coated
F. Triple O ring seal
G. 304 Stainless steel nuts and bolts
H. Non-rising bronze stem with 2 inch nut

1. Provided with PVC valve riser and box
I. Mueller, M&H, Clow, or equal

2.8 VALVE ACTUATORS
A. General

1. Provide type as shown or specified

2. Clockwise opening

3. Maximum pull of 80 LBS to operate valve
B. Exposed actuators

1. Lever actuators for plug valves and ball valves 3 IN and less

2. Gear actuators for plug valves and ball valves larger than 4 IN a. Totally enclosed, permanently lubricated

3. Handwheel actuators for gate valves
C. Buried actuators

1. Cast iron valve box with cover

2. 2 IN actuator nuts

3. Extension stem as required:
a. Galvanized

2.9 VALVE BOXES
A. Provide at each buried valve with non-rising stem and operating nut.

B. Per details shown on drawings
C. Provide with PVC riser
15100
D. Precast concrete valve box with galvanized steel cover.

1. Unless otherwise shown on drawings
PART 3 – EXECUTION

3.1 INSTALLATION
A. Install per manufacturer’s instructions.

B. Air Release Valves: Pipe exhaust to a suitable disposal point. Where exhausted to a trapped floor drain, terminate exhaust line 6 IN minimum above floor.

3.2 SCHEDULES
A. See piping schedules for valve service type.

END OF SECTION
15350
SECTION 15350

PIPING CONNECTORS
A. RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

B. SUMMARY
A. Section Includes:

A. Rubber expansion joints.

C. DEFINITIONS
A. Buna-N: Nitrile rubber.

B. EPDM: Ethylene-propylene-diene terpolymer rubber.

C. NR: Natural rubber.

D. FKM: Viton or equal fluorine kautschuk material as defined by ASTM international standard D1418 and ISO standard 1629
D. PERFORMANCE REQUIREMENTS
A. Compatibility: Products shall be suitable for piping system fluids, materials, working pressures, and temperatures.

B. Capability: Products shall absorb 200 percent of maximum axial movement between anchors.

E. SUBMITTALS
A. Product Data: For each type of product indicated.

B. Product Certificates: For each type of pipe expansion joint, signed by product manufacturer.

C. Maintenance Data: For pipe expansion joints to include in maintenance manuals.

B. PRODUCTS
A. Rubber Expansion Joints: ASTM F 1123, fabric-reinforced rubber with external control rods and complying with FSA's "Technical Handbook: Non-Metallic Expansion Joints and Flexible Pipe Connectors."
A. Allowable Manufacturers:
15350
A. Flex-Hose Co., Inc.

B. Flexicraft Industries.

C. Garlock Sealing Technologies.

D. General Rubber Corp.

E. Mason Industries, Inc.; Mercer Rubber Co.

F. Or equal
B. Arch Type: Single or multiple arches.

C. Spherical Type: Single spheres.

A. Minimum Pressure and Temperature Ratings 150 psig at 220 deg F.

D. Material: Buna-N, NR, or FKM as required for service.

E. End Connections: Full-faced, integral, steel flanges with steel retaining rings.

F. NSF 61 compliant.

C. EXECUTION
A. FLEXIBLE JOINT INSTALLATION
A. Install manufactured, nonmetallic expansion joints according to FSA's "Technical Handbook:

Non-Metallic Expansion Joints and Flexible Pipe Connectors." B. Install flexible joints of sizes matching size of piping in which they are installed.

C. Set control rod limits when low pressure air piping is cold to allow for compression of unit as piping heats up.

B. SCHEDULE
A. Flexible connections at pump inlet and discharge flanges A. Booster Pumps: Harnessed Rubber Expansion Joints
B. Flexible connection at Water Tank
A. Harnessed Rubber Double Arch Rubber Expansion Joint

END OF SECTION
15500
SECTION 15500

PIPING SCHEDULES

PIPING SCHEDULE
Pipe ID Note Material Total LF Spec Reference
Minimum Cover
Requirements
2" SW
Buried >14" Cover
SCH 80
PVC 70 15060-2.3E 18” minimum cover
Buried < 14" Cover
Ductile
Iron or
Galvanized
(where
specified)
7 15060-2.3A
and C
-

1.25" PW - Copper 26 15060-2.3D 30” minimum cover

1.5" PW - SCH 80
PVC 70 15060-2.3E 30” minimum cover
2" NACLO
Secondary Containment
Buried Pipe
SCH 80
CPVC 65 15060-2.3F 18” minimum cover
Tank 1 and 2 Fill
SCH 80
CPVC 62 15060-2.3F -
Tank 1 and 2 Outlet
SCH 80
CPVC 39 15060-2.3F -
All buried piping shall have a minimum of 6” of AB below pavement or ground surface at 95% RC, and engineered fill below AB and above pipe at 90% RC (minimum depth engineered fill per minimum cover requirements). A minimum of 6” of sand shall be below and adjacent to all buried pipe. Concrete encasement may be permitted at the discretion of the owner if less than 18” of cover is available.

END OF SECTION

ARTICLES OF AGREEMENT

SODIUM HYPOCHLORITE UPGRADE
BID NO. 25-04

IN THE CITY OF LAKEPORT, CALIFORNIA
THIS SODIUM HYPOCHLORITE UPGRADE, BID NO. 25-04, AGREEMENT (“AGREEMENT”) is made and entered into for the above-stated project this 6th day of January, 2026, BY AND BETWEEN the CITY OF LAKEPORT, a municipal corporation, hereafter designated as “AGENCY”, and JAMES A.

PIAZZA, DBA PIAZZA CONSTRUCTION, a California sole proprietorship, hereafter designated as “CONTRACTOR.” WITNESSETH that AGENCY and CONTRACTOR have mutually agreed as follows:

ARTICLE I: Contract Documents
The contract documents for SODIUM HYPOCHLORITE UPGRADE, BID NO. 25-04, shall consist of the Notice Inviting Sealed Bids, Instructions To Bidders, Bid Proposal, Bid Schedule, Standard Specifications, Special Provisions, and all referenced specifications, details, standard drawings, and appendices; together with two signed copies of the AGREEMENT, two signed copies of required bonds; one copy of the insurance certificates, permits, notices, and affidavits; and also including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to ensure its completion in an acceptable manner (collectively referred to herein as the “Contract Documents”). All of the provisions of the Contract Documents are made a part hereof as though fully set forth herein.

ARTICLE II: Scope of Work
For and in consideration of the payments and agreements to be made and performed by AGENCY, CONTRACTOR agrees to furnish all materials and equipment and perform all work required for the abovestated project, and to fulfill all other obligations as set forth in the aforesaid contract documents.

AGENCY hereby employs CONTRACTOR to provide the materials, do the work, and fulfill the obligations according to the terms and conditions herein contained and referred to, for the prices provided herein, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth in this AGREEMENT.

In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to this AGREEMENT, CONTRACTOR offers and agrees to assign to the AGENCY all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (Section 16700, et seq.) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to CONTRACTOR, without further acknowledgment by the parties.

ARTICLE III: Compensation
A. CONTRACTOR agrees to receive and accept the prices set forth in the Bid Proposal and Bid Schedule as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. In no event shall the total compensation and costs payable to CONTRACTOR under this Agreement exceed the sum of EIGHT HUNDRED EIGHTY-TWO THOUSAND DOLLARS ($882,000.00) unless specifically approved in advance and in writing by AGENCY Such compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid Contract Documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.

B. This AGREEMENT is subject to the provisions of Article 1.7 (commencing at Section 20104.50) of Division 2, Part 3 of the Public Contract Code regarding prompt payment of contractors by local governments. Article 1.7 mandates certain procedures for the payment of undisputed and properly submitted payment requests within 30 days after receipt, for the review of payment requests, for notice to Contractor of improper payment requests, and provides for the payment of interest on progress payment requests which are not timely made in accordance with that Article. This AGREEMENT hereby incorporates the provisions of Article 1.7 as though fully set forth herein.

C. At the request and expense of CONTRACTOR, securities equivalent to the amount withheld shall be deposited with AGENCY, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to CONTRACTOR upon Agency’s confirmation of CONTRACTOR’S satisfactory completion of this AGREEMENT. At any time during the term of this AGREEMENT CONTRACTOR may, at its own expense, substitute securities for funds otherwise withheld as retention (or the retained percentage) in accordance with Public Contract Code § 22300.

ARTICLE IV: Labor Code
AGENCY and CONTRACTOR acknowledge that this AGREEMENT is subject to the provisions of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works and public agencies and agree to be bound by all the provisions thereof as though set forth fully herein. Full compensation for conforming to the requirements of the Labor Code and with other Federal, State and local laws related to labor, and rules, regulations and ordinances which apply to any work performed pursuant to this AGREEMENT is included in the price for all contract items of work involved.

This AGREEMENT is further subject to prevailing wage law, including, but not limited to, the following:

A. The CONTRACTOR shall pay the prevailing wage rates for all work performed under the AGREEMENT. When any craft or classification is omitted from the general prevailing wage determinations, the CONTRACTOR shall pay the wage rate of the craft or classification most closely related to the omitted classification. The CONTRACTOR shall forfeit as a penalty to AGENCY $200.00 or any greater penalty provided in the Labor Code for each Calendar Day, or portion thereof, for each worker paid less than the prevailing wage rates for any work done under the AGREEMENT in violation of the provisions of the Labor Code whether such worker is employed in the execution of the work by CONTRACTOR or by any Subcontractor under CONTRACTOR. In addition, CONTRACTOR shall pay each worker the difference between such prevailing wage rates and the amount paid to each worker for each Calendar Day, or portion thereof, for which each worker was paid less than the prevailing wage rate.

B. CONTRACTOR shall comply with the provisions of Labor Code Section 1777.5 concerning the employment of apprentices on public works projects, and further agrees that CONTRACTOR is responsible for compliance with Section 1777.5 by all of its subcontractors.

C. Pursuant to Labor Code § 1725.5, CONTRACTOR and any subcontractor must be registered with the California Department of Industrial Relations for any bid proposal submitted on or after March 1, 2015, and for any contract for public work entered into on or after April 1, 2015. Further, this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

D. Pursuant to Labor Code § 1776, CONTRACTOR and any subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with this AGREEMENT.

Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following: (1) The information contained in the payroll record is true and correct; and (2) The employer has complied with the requirements of Labor Code §§ 1811, and 1815 for any work performed by his or her employees on the public works project. The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours as required by Labor Code § 1776.

E. This AGREEMENT is further subject to 8-hour work day and wage and hour penalty law, including, but not limited to, Labor Code Sections 1810 and 1813, as well as California nondiscrimination laws, as follows:

CONTRACTOR shall strictly adhere to the provisions of the Labor Code regarding the 8-hour day and the 40-hour week, overtime, Saturday, Sunday and holiday work and nondiscrimination on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex or sexual orientation, except as provided in Section 12940 of the Government Code.

Pursuant to the provisions of the Labor Code, eight hours’ labor shall constitute a legal day’s work. Work performed by CONTRACTOR’s employees in excess of eight hours per day, and 40 hours during any one week, must include compensation for all hours worked in excess of eight hours per day, or 40 hours during any one week, at not less than one and one-half times the basic rate of pay. CONTRACTOR shall forfeit as a penalty to AGENCY $25.00 or any greater penalty set forth in the Labor Code for each worker employed in the execution of the work by CONTRACTOR or by any Subcontractor of CONTRACTOR, for each Calendar Day during which such worker is required or permitted to the work more than eight hours in one Calendar Day or more than 40 hours in any one calendar week in violation of the Labor Code.

F. This AGREEMENT is subject to Public Contract Code Section 6109: CONTRACTOR shall be prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Sections 1777.1 or 1777.7 of the Labor Code.

ARTICLE V: Work Site Conditions
A. In compliance with and pursuant to Government Code Section 4215, AGENCY shall assume the responsibility, as between the parties to this AGREEMENT, for the timely removal, relocation, or protection of existing main- or trunk-line utility facilities located on the site of any construction project that is a subject of this AGREEMENT, if such utilities are not identified by AGENCY in the plans and specifications made a part of the invitation for bids. The Contract Documents shall include provisions to compensate CONTRACTOR for the costs of locating, repairing damage not due to the failure of CONTRACTOR to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and specifications with reasonable accuracy, and for equipment on the project necessarily idled during such work. CONTRACTOR shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of AGENCY or the owner of a utility to provide for removal or relocation of such utility facilities.

B. To the extent that the work requires trenches in excess of five feet (5’) and is estimated to cost more than $25,000, prior to any excavation, CONTRACTOR must provide the AGENCY, or a registered civil or structural engineer employed by the AGENCY to whom authority has been delegated to accept such plans, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. Nothing in this section shall be deemed to allow the use of a shoring, sloping, or protective system less effective than that required by the Construction Safety Orders.

C. This AGREEMENT is further subject to Public Contract Code Section 7104 with regard to any trenches deeper than four feet (4’) involved in the proposed work as follows:

CONTRACTOR shall promptly, and before the following conditions are disturbed, notify AGENCY, in writing, of any:
(1) Material that CONTRACTOR believes may be hazardous waste, as defined in Section 25117 of the Health and Safety Code, which is required to be removed to a Class I, Class II, or Class III disposal site in accordance with existing law.
(2) Subsurface or latent physical conditions at the site differing from those indicated by all available information provided prior to the deadline for submission of bids. (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.

AGENCY shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or involve hazardous waste, and cause a decrease or increase in CONTRACTOR’s cost of, or the time required for, performance of any part of the work, AGENCY shall issue a change order under the procedures described in this AGREEMENT.

In the event that a dispute arises between AGENCY and CONTRACTOR whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in CONTRACTOR’s cost of, or time required for, performance of any part of the work, CONTRACTOR shall not be excused from any scheduled completion date provided in the AGREEMENT, but shall proceed with all work to be performed under the AGREEMENT. CONTRACTOR shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties.

ARTICLE VI: Insurance
A. With respect to performance of work under this AGREEMENT, CONTRACTOR shall maintain, and shall require all of its subcontractors to maintain, insurance as required by Section E “Standard Specifications” of the Contract Documents.

B. This AGREEMENT is further subject to Workers’ Compensation obligations, including, but not limited to, California Labor Code Sections 1860 and 1861 as follows:

CONTRACTOR shall take out and maintain, during the life of this contract, Worker’s Compensation Insurance for all of CONTRACTOR’s employees employed at the site of improvement; and, if any work is sublet, CONTRACTOR shall require the subcontractor similarly to provide Worker’s Compensation Insurance for all of the latter’s employees, unless such employees are covered by the protection afforded by CONTRACTOR. CONTRACTOR and any of CONTRACTOR’s subcontractors shall be required to provide AGENCY with a written statement acknowledging its obligation to secure payment of Worker’s Compensation Insurance as required by Labor Code § 1861; to wit: ‘I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.’ If any class of employees engaged in work under this AGREEMENT at the site of the Project is not protected under any Worker’s Compensation law, CONTRACTOR shall provide and shall cause each subcontractor to provide adequate insurance for the protection of employees not otherwise protected. CONTRACTOR shall indemnify and hold harmless AGENCY for any damage resulting from failure of either CONTRACTOR or any subcontractor to take out or maintain such insurance.

ARTICLE VII: Indemnification
To the fullest extent permitted by law, CONTRACTOR shall, at its sole cost and expense, fully defend, indemnify and hold harmless AGENCY, its authorized representatives and their respective subsidiaries, affiliates, members, directors, officers, employees and agents (collectively, the “Indemnitees”) from and against any and all claims, actions, demands, costs, judgments, liens, penalties, liabilities, damages, losses, and expenses, including but not limited to any fees of accountants, attorneys or other professionals (collectively “Liabilities”), arising out of, in connection with, resulting from or related to, any alleged act, omission, fault or negligence of CONTRACTOR, CONTRACTOR’s Representative, or any of its officers, agents, employees, Subcontractors or Suppliers, or any person or organization directly or indirectly employed by any of them (Collectively, the “Indemnitors”), in connection with or relating to or claimed to be in connection with or relating to the work performed under this AGREEMENT.

CONTRACTOR shall not be entitled to any refund of attorneys’ fees, defense costs and expenses in the event that it is adjudicated to have been non-negligent.

CONTRACTOR shall not be required to defend or indemnify AGENCY for liabilities caused by the sole active negligence or willful misconduct of the AGENCY.

If CONTRACTOR is a joint venture or partnership, each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of CONTRACTOR that are assumed under or arise out of this AGREEMENT. Each of such venturers or partners waives notice of the breach or non-performance of any undertaking or obligation of CONTRACTOR contained in, resulting from or assumed under this AGREEMENT, and the failure to give any such notice shall not affect or impair such venturer’s or partner’s joint and several liability hereunder.

ARTICLE VIII: Binding Effect
AGENCY and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto and to its partners, successors, assigns, and legal representatives in respect of all covenants, agreements, and obligations contained in the Contract Documents. This AGREEMENT is not assignable nor the performance of either party’s duties delegable without the prior written consent of the other party. Any attempted or purported assignment or delegation of any of the rights of obligations of either party without the prior written consent of the other shall be void and of no force and effect.

ARTICLE IX: Dispute Resolution
A. Any court action arising out of this AGREEMENT shall be filed in the Lake County Superior Court. Any alternative dispute resolution proceeding arising out of this AGREEMENT shall be heard in the County of Lake.

B. AGENCY shall have full authority to compromise or otherwise settle any claim relating to this AGREEMENT or any part hereof at any time. AGENCY shall provide timely notification to CONTRACTOR of the receipt of any third-party claim relating to this AGREEMENT. AGENCY shall be entitled to recover its reasonable costs incurred in providing the notification required by this section.

C. To the extent applicable, this AGREEMENT is subject to the provisions of Public Contract Code Section 9204, which mandates certain procedures regarding the resolution of public works claims. This AGREEMENT is further subject to the provisions of Article 1.5 (commencing at Section 20104) of Division 2, Part 3 of the Public Contract Code regarding the resolution of public works claims of less than $375,000. Article 1.5 mandates certain procedures for the filing of claims and supporting documentation by Contractor, for the response to such claims by the Agency, for a mandatory meet and confer conference upon the request of Contractor, for mandatory nonbinding mediation in the event litigation is commenced, and for mandatory judicial arbitration upon the parties’ failure to resolve the dispute through mediation.

This AGREEMENT hereby incorporates the provisions of Article 1.5 as though fully set forth herein.

ARTICLE X: Independent Contractor
CONTRACTOR is and shall at all times remain as to AGENCY, a wholly independent contractor. Neither AGENCY nor any of its agents shall have control of the conduct of CONTRACTOR or any of CONTRACTOR’s employees, except as herein set forth. CONTRACTOR shall not at any time or in any manner represent that it or any of its agents or employees are in any manner agents or employees of AGENCY.

ARTICLE XI: Taxes
CONTRACTOR is responsible for paying all retail, sales and use, transportation, export, import, special or other taxes and duties applicable to, and assessable against any work, materials, equipment, services, processes and operations incidental to or involved in this AGREEMENT. The CONTRACTOR is responsible for ascertaining and arranging to pay such taxes and duties. The prices established in this AGREEMENT shall include compensation for any taxes the CONTRACTOR is required to pay by laws and regulations in effect as of the execution of this AGREEMENT.

ARTICLE XII: Notices
All notices and communications shall be sent in writing to the parties at the following addresses:

AGENCY: Paul Harris CONTRACTOR: James Piazza
CITY OF LAKEPORT JAMES A. PIAZZA, DBA PIAZZA CONSTRUCTION 225 Park Street P.O. Box 573
Lakeport, CA 95453 Penngrove, CA 94951
ARTICLE XIII: Entire Agreement
This AGREEMENT supersedes any and all other agreements, either oral or written, between the parties and contains all of the covenants and agreements between the parties pertaining to the work of improvements described herein. Each party to this AGREEMENT acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that any other agreement, statement or promise not contained in this AGREEMENT shall not be valid or binding. Any modification of this AGREEMENT will be effective only if signed by the party to be charged.

The benefits and obligations of this AGREEMENT shall inure to and be binding upon the representatives, agents, partners, heirs, successors and assigns of the parties hereto. This AGREEMENT shall be construed pursuant to the laws of the State of California.

ARTICLE XIV: Authority to Contract
The signatories hereto represent that they are authorized to sign on behalf of the respective parties they represent and are competent to do so, and each of the parties hereto hereby irrevocably waives any and all rights to challenge signatures on these bases.

ARTICLE XV: General Provisions
A. All reports, documents or other written material (“written products” herein) developed by CONTRACTOR in the performance of this Agreement shall be and remain the property of AGENCY without restriction or limitation upon its use or dissemination by AGENCY. CONTRACTOR may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by CONTRACTOR.

B. In the performance of this Agreement, CONTRACTOR shall not discriminate against any employee, subcontractor, or applicant for employment because of race, color, creed, religion, sex, marital status, sexual orientation, national origin, ancestry, age, physical or mental disability, medical condition or any other unlawful basis.

C. The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph at the head of which it appears, the section or paragraph hereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement. Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

D. The waiver by AGENCY or CONTRACTOR of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. No term, covenant or condition of this Agreement shall be deemed to have been waived by AGENCY or CONTRACTOR unless in writing.

E. Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such party of any of all of such other rights, powers or remedies.

F. CONTRACTOR shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services or expenditures and disbursements charged to CITY under this Agreement for a minimum of three (3) years, or for any longer period required by law, from the date of final payment to CONTRACTOR under this Agreement. All such documents shall be made available for inspection, audit, and/or copying at any time during regular business hours, upon oral or written request of CITY. In addition, pursuant to Government Code Section 8546.7, all such documents and this Agreement shall be subject to the examination and audit of the State Auditor, at the request of CITY or as part of any audit of CITY, for a period of three (3) years after final payment under the Agreement.

G. This Agreement may be signed in one or more counterparts, each of which shall be deemed an original, but all of which together shall be deemed one and the same instrument. The parties acknowledge and agree that this Agreement may be executed by electronic signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature. Without limitation, “electronic signature” shall include faxed or emailed versions of an original signature, electronically scanned and transmitted versions (e.g., via pdf) of an original signature, or a digital signature.

H. Not used
IN WITNESS WHEREOF the parties hereto for themselves, their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained and have caused this AGREEMENT to be executed in duplicate by setting hereunto their names, titles, hands, and seals this 6th day of January 2026.

CONTRACTOR: JAMES A. PIAZZA, DBA PIAZZA CONSTRUCTION
__________________________________________
James Piazza, Owner
Contractor’s License No. 406456
Subscribed and sworn to this _______ day of _________, 20__.

NOTARY PUBLIC ______________________________________________ (SEAL) AGENCY: ______________________________ __________
City Manager Date
City of Lakeport
ATTESTED: ______________________________ __________
City Clerk of the Date
City of Lakeport

APPROVED AS
TO FORM: ______________________________ __________
Assistant City Attorney of the Date
City of Lakeport
( E X E C U T E I N D U P L I C A T E )

PAYMENT BOND

SODIUM HYPOCHLORITE UPGRADE
BID NO. 25-04

IN THE CITY OF LAKEPORT, CALIFORNIA
WHEREAS, the City of Lakeport, as AGENCY has awarded to James A. Piazza, DBA Piazza Construction, as CONTRACTOR, a contract for the above-stated project; AND WHEREAS, CONTRACTOR is required to furnish a bond in connection with the contract, to secure the payment of claims of laborers, mechanics, material persons, and other persons as provided by law; NOW THEREFORE, we, the undersigned CONTRACTOR and SURETY, are held and firmly bound unto AGENCY in the sum of EIGHT HUNDRED EIGHTY-TWO THOUSAND DOLLARS ($882,000.00); which is one hundred percent (100%) of the total contract amount for the above-stated project, for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION IS SUCH that if CONTRACTOR, its heirs, executors, administrators, successors, assigns or subcontractors, shall fail to pay any of the persons named in Civil Code Section 9100, or amounts due under the Unemployment Insurance Code with respect to work or labor withheld, and to pay over to the Employment Development Department from the wages of employees of the CONTRACTOR and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, with respect to such work and labor, that the surety or sureties herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In case suit is brought upon this bond, SURETY will pay reasonable attorneys’ fees to the plaintiffs and AGENCY in an amount to be fixed by the court.

This bond shall inure to the benefit to any of the persons named in Civil Code Section 9100 as to give a right of action to such persons or their assigns in any suit brought upon this bond.

The SURETY hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or the specifications accompanying it shall in any manner affect SURETY’s obligations on this bond. The SURETY hereby waives notice of any such change, extension, alteration or addition and hereby waives the requirements of Section 2845 of the Civil Code as a condition precedent to any remedies AGENCY may have.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this day of ________________, 2025.

Contractor* ______________________ SURETY*………………………………………..

James Piazza, Owner
James A. Piazza, DBA Piazza Construction …………………..…………………….

P.O. Box 573 …………………………………….…..

Penngrove, CA 94951 …………………………………………
707-876-3410 …………………………………………
*Provide CONTRACTOR and SURETY name, address and telephone number and the name, title, address and telephone number for the respective authorized representatives. Power of Attorney must be attached.

Subscribed and sworn to this___ day of _____________________, 2025.

NOTARY PUBLIC.................................................................................................. (SEAL) (E X E C U T E I N D U P L I C A T E)

FAITHFUL PERFORMANCE BOND

SODIUM HYPOCHLORITE UPGRADE
BID NO. 25-04

IN THE CITY OF LAKEPORT, CALIFORNIA
KNOW ALL PERSONS BY THESE PRESENTS That James A. Piazza, DBA Piazza Construction, hereinafter referred to as “CONTRACTOR” as PRINCIPAL, and , a corporation duly organized and doing business under and by virtue of the laws of the State of California and duly licensed for the purpose of making, guaranteeing, or becoming sole surety upon bonds or undertakings as Surety, are held and firmly bound unto the CITY OF LAKEPORT, CALIFORNIA, hereinafter referred to as the “AGENCY” in the sum EIGHT HUNDRED EIGHTY-TWO THOUSAND DOLLARS ($882,000.00); which is one hundred percent (100%) of the total contract amount for the above stated project; lawful money of the United States of America for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, assigns and successors, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that whereas CONTRACTOR has been awarded and is about to enter into a Contract with AGENCY to perform all work required pursuant to the contract documents for the project entitled: SODIUM HYPOCHLORITE UPGRADE, BID NO. 25-04 CONTRACT which Contract is by this reference incorporated herein, and is required by AGENCY to give this Bond in connection with the execution of the Contract; NOW, THEREFORE, if CONTRACTOR and his or her Subcontractors shall well and truly do and perform all the covenants and obligations of the Contract on his or her part to be done and performed at the times and in the manner specified herein including compliance with all Contract specifications and quality requirements, then this obligation shall be null and void, otherwise it shall be and remain in full force and effect;
PROVIDED, that any alterations in the work to be done, or in the material to be furnished, which may be made pursuant to the terms of the Contract, shall not in any way release CONTRACTOR or the Surety thereunder, nor shall any extensions of time granted under the provisions of the Contract release either CONTRACTOR or said Surety, and notice of such alterations of extensions of the Contract is hereby waived by said Surety.

In the event suit is brought upon this Bond by AGENCY and judgment is recovered, said Surety shall pay all costs incurred by AGENCY in such suit, including a reasonable attorney’s fee to be fixed by the Court.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this…….day of ......................................, 2025.

Contractor* ______________________ SURETY*………………………………………..

James Piazza, Owner
James A. Piazza, DBA Piazza Construction …………………..…………………….

P.O. Box 573 …………………………………….…..

Penngrove, CA 94951 …………………………………………
707-876-3410 …………………………………………

*Provide CONTRACTOR and SURETY name, address and telephone number and the name, title, address and telephone number for their respective authorized representatives. Power of Attorney must be attached.

Subscribed and sworn to this___ day of ______________ , 2025.

NOTARY PUBLIC.................................................................................................. (SEAL) (E X E C U T E I N D U P L I C A T E)

MAINTENANCE BOND

SODIUM HYPOCHLORITE UPGRADE
BID NO. 25-04

IN THE CITY OF LAKEPORT, CALIFORNIA
KNOW ALL PERSONS BY THESE PRESENTS THAT WHEREAS, the City of Lakeport, as AGENCY has awarded to James A. Piazza, DBA Piazza Construction, as CONTRACTOR, a contract for the abovestated project.

AND WHEREAS, CONTRACTOR is required to furnish a bond in connection with the contract guaranteeing maintenance thereof;
NOW, THEREFORE, we, the undersigned CONTRACTOR and SURETY, are held firmly bound unto AGENCY in the sum of HOUR HUNDRED FORTY-ONE THOUSAND DOLLARS ($441,000.00), which is fifty percent (50%) of the total contract amount for the above-stated project to be paid to AGENCY, its successors and assigns, for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that if CONTRACTOR shall remedy without cost to AGENCY any defects which may develop during a period of one (1) year from the date of recordation of the Notice of Completion of the work performed under the contract, provided such defects are caused by defective or inferior materials or work, then this obligation shall be void; otherwise it shall be and remain in full force and effect. In case suit is brought upon this bond, SURETY will pay reasonable attorneys’ fees to the AGENCY in an amount to be fixed by the court.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this____ day of ......................................, 2025.

Contractor* ______________________ SURETY*………………………………………..

James Piazza, Owner
James A. Piazza, DBA Piazza Construction …………………..…………………….

P.O. Box 573 …………………………………….…..

Penngrove, CA 94951 …………………………………………
707-876-3410 …………………………………………
*Provide CONTRACTOR and SURETY name, address and telephone number and the name, title, address and telephone number for their respective authorized representatives. Powers of Attorney must be attached.

Subscribed and sworn to this ........... day of..............................., 2025.

NOTARY PUBLIC.................................................................................................. (SEAL) (EXECUTE IN DUPLICATE)

← All documents from this meeting