Cities Index.
Agenda packet

Lakeport City Council
April 21, 2026

Document
Agenda packet
Meeting
April 21, 2026
Body
Lakeport City Council
Pages
17
Original file
23.9 MB
Text extracted from the city's file for reading and search. Open the original on www.cityoflakeport.com. That file is the official record.

If you cannot attend in person, and would like to speak on an agenda item, you can access the Zoom meeting remotely:

Join from a PC, Mac, iPad, iPhone or Android device:

Please click this URL to join. Zoom Meeting Link Passcode: 477973 Or join by phone:

Dial (for higher quality, dial a number based on your current location):

US: +1 669 900 9128 or +1 346 248 7799 or +1 253 215 8782 or +1 646 558 8656 or +1 301 715 8592 or +1 312 626 6799 Webinar ID: 973 6820 1787
Passcode: 477973
International numbers available: https://zoom.us/u/abNyiaqY1I The City wants you to know that you can also submit your comments by email to [email protected].

To give the City Clerk adequate time to print out your comments for consideration at the meeting, please submit your written comments prior to 3:30 p.m. on Tuesday, April 21, 2026.

Please indicate in the email Subject Line "FOR PUBLIC COMMENT" and list the item number you wish to comment on.

Comments that you want read to the Council will be subject to the three minute time limitation (approximately 350 words).

Written comments that are only to be provided to Council and not read at the meeting will be distributed to the Council prior to the meeting.

AGENDA

REGULAR MEETING OF THE LAKEPORT CITY COUNCIL
(ALSO MEETS AS THE CITY OF LAKEPORT MUNICIPAL SEWER DISTRICT, THE LAKEPORT INDUSTRIAL

DEVELOPMENT AUTHORITY, THE MUNICIPAL FINANCING AGENCY OF LAKEPORT, THE LAKEPORT GROUNDWATER SUSTAINABLITY AGENCY and THE SUCCESSOR AGENCY TO THE FORMER LAKEPORT

REDEVELOPMENT AGENCY)
Tuesday, April 21, 2026 6:00 p.m.

City Council Chambers, 225 Park Street, Lakeport, California 95453 See Teleconferencing Instructions Below
City Council Agenda of April 21, 2026 Page 2
AGENDA

REGULAR MEETING OF THE LAKEPORT CITY COUNCIL
(ALSO MEETS AS THE CITY OF LAKEPORT MUNICIPAL SEWER DISTRICT, THE LAKEPORT INDUSTRIAL

DEVELOPMENT AUTHORITY, THE MUNICIPAL FINANCING AGENCY OF LAKEPORT, LAKEPORT GROUNDWATER SUSTAINABILITY AUTHORITY and THE SUCCESSOR AGENCY TO THE FORMER LAKEPORT REDEVELOPMENT AGENCY)*
Tuesday, April 21, 2026, 6:00 p.m.

City Council Chambers, 225 Park Street, Lakeport, California 95453 *All references to “City Council” include those other agencies which are listed above The City Council may discuss and/or take action on any or all of the items listed on the agenda irrespective of how the agenda items are described. The council may establish and make appointments to a Council committee (made up of two Councilmembers) with respect to any item appearing on this agenda.

I. CALL TO ORDER & ROLL CALL: 6:00 p.m.

II. PLEDGE OF ALLEGIANCE:

III. ACCEPTANCE OF AGENDA/
URGENCY ITEMS:

Move to accept agenda as posted or move to add or delete items.

To add item, Council is required to make a majority decision that an urgency exists (as defined in the Brown Act) and a 2/3rds determination that the need to take action arose subsequent to the agenda being posted.

IV. CONSENT AGENDA: The following Consent Agenda items are expected to be routine and noncontroversial. They will be acted upon by the Council at one time without any discussion. Any Council Member may request that any item be removed from the Consent Agenda for discussion under the regular Agenda. Removed items will be considered following the Consent Calendar portion of this agenda.

A. Ordinances: Waive reading except by title, of any ordinances under consideration at this meeting for either introduction or passage per Government Code Section 36934.

B. Minutes: Approve minutes of the City Council regular meeting of April 7, 2026.

C. Warrants: Approve the warrant register of April 8, 2026.

D. Application 2026-018: Approve application 2026-018, with staff recommendations, for the 2026 Summer Concert Series.

E. Application 2026-019: Approve application 2026-019, with staff recommendations, for the Tuesday Farmers Markets in the Park.

F. SSMP Update: Adopt a resolution approving and certifying the City of Lakeport Municipal Sewer District Sewer System Management Plan (SSMP) update, prepared in compliance with State Water Resources Control Board Order WQ 2022-0103-DWQ, and authorizing the Compliance Officer to certify the document in the California Integrated Water Quality System (CIWQS) on behalf of the CLMSD Director.

G. Measure Z Advisory Committee
(MZAC):

Receive and file the minutes of the MZAC regular meeting of April 15, 2026.

V. PUBLIC
PRESENTATIONS/REQUESTS:

A. Public Input: Any person may speak for 3 minutes about any subject within the authority of the City Council, provided that the subject is not already on tonight’s agenda. Per Government Code §54954.3(a), the City Council cannot take action or express a consensus of approval or disapproval on any public comments regarding matters which do not appear on the printed agenda.

B. New Employee Introduction: Introduce new Utilities Department employee Trina Kollasch.

VI. PUBLIC HEARING:

City Council Agenda of April 21, 2026 Page 3
VII. COUNCIL BUSINESS:

A. Administrative Services Director:

1. Title VI Program
Documents:

Rescind Resolution 2713 (2019) and adopt a Resolution approving the City of Lakeport Title VI Plan, the Limited English Proficiency (LEP) Assessment and Language Access Plan (LAP) and the Title VI Annual Work Plan.

B. Utilities Director

1. Water & Sewer Rate
Study
Authorize the City Manager to execute a PSA with Willdan Financial Services for the completion of a Water & Sewer rate study for $52,950.

C. City Manager

1. Fiscal Year 2026/27
Goals:

Conduct a Strategic Planning Workshop for Fiscal Year 25/26 Citywide Departmental Goals.

VIII. CITY COUNCIL
COMMUNICATIONS:

A. Travel, Calendar, and
Miscellaneous Reports, if any:

IX. ADJOURNMENT:

Materials related to an item on this Agenda submitted to the Council after distribution of the agenda packet are available for public inspection in the City Clerk’s Office at 225 Park Street, Lakeport, California, during normal business hours. Such documents are also available on the City of Lakeport’s website, www.cityoflakeport.com, subject to staff’s ability to post the documents before the meeting.

The City of Lakeport, in complying with the Americans with Disabilities Act (ADA), requests individuals who require special accommodations to access, attend and/or participate in the City meeting due to disability, to please contact the City Clerk’s Office, (707) 263-5615, 72 hours prior to the scheduled meeting to ensure reasonable accommodations are provided. _______________________________________
Hilary Britton, Deputy City Clerk
City Council Minutes of April 7, 2026 Page 2

MINUTES

REGULAR MEETING OF THE LAKEPORT CITY COUNCIL
(ALSO MEETS AS THE CITY OF LAKEPORT MUNICIPAL SEWER DISTRICT, THE

LAKEPORT INDUSTRIAL DEVELOPMENT AUTHORITY, THE MUNICIPAL FINANCING

AGENCY OF LAKEPORT, LAKEPORT GROUNDWATER SUSTAINABILITY AUTHORITY and THE SUCCESSOR AGENCY TO THE FORMER LAKEPORT REDEVELOPMENT AGENCY)*
Tuesday, April 7, 2026, 6:00 p.m.

City Council Chambers, 225 Park Street, Lakeport, California 95453 *All references to “City Council” include those other agencies which are listed above The City Council may discuss and/or take action on any or all of the items listed on the agenda irrespective of how the agenda items are described. The council may establish and make appointments to a Council committee (made up of two Councilmembers) with respect to any item appearing on this agenda.

I. CALL TO ORDER & ROLL CALL: Mayor Disney called the meeting to order at 6:01 p.m. with Council Members Costa, Mattina, Parlet and Price present.

A moment of silence was observed for world-renown Lake County artist, Ron Keas, who recently passed away.

II. PLEDGE OF ALLEGIANCE: The Pledge of Allegiance was led by Mayor Disney, III. ACCEPTANCE OF AGENDA/ URGENCY
ITEMS:

A motion was made by Council Member Mattina, seconded by Council Member Parlet, and unanimously carried by voice vote 5-0-0-0 to accept the agenda as posted.

IV. CONSENT AGENDA: The following Consent Agenda items are expected to be routine and noncontroversial. They will be acted upon by the Council at one time without any discussion. Any Council Member may request that any item be removed from the Consent Agenda for discussion under the regular Agenda. Removed items will be considered following the Consent Calendar portion of this agenda.

A. Ordinances: Waive reading except by title, of any ordinances under consideration at this meeting for either introduction or passage per Government Code Section 36934.

B. Minutes: Approve minutes of the City Council regular meeting of March 17, 2026.

C. Application 2026-015: Approve application 2026-015, with staff recommendations, for the Kiwanis use of the Snack Shack on the Fourth of July.

D. Application 2026-016: Approve application 2026-016, with staff recommendations, for the 2026 Memorial Day Parade.

E. Application 2026-017: Approve application 2026-017, with staff recommendations, for reserved parking on Forbes Street during the June election period.

F. Job Description Updates: Approve the modified Financial Services Specialist I / II / III classification and job description.

G. SB 1 Project List: Adopt the proposed resolution approving the City of Lakeport SB 1 Project List for fiscal year 2026-27 and direct staff to submit to the California Transportation Commission.

H. Supplemental Law Enforcement
Services:

Authorize the Police Chief to execute a Law Enforcement Service MOU with the City of Clearlake.

Vote on Consent Agenda: A motion was made by Council Member Parlet, seconded by Council Member Costa, and unanimously carried by voice vote 5-0-0-0 to approve the Consent Agenda, items A-H.

V. PUBLIC PRESENTATIONS/REQUESTS:

A. Public Input: Marie Schrader from Discover Lakeport CA provided an update on her climbing social media and website reach, and on a number of upcoming activities in Lakeport.

City Council Minutes of April 7, 2026 Page 3
B. Presentation: Representatives from the Children’s Council and the Lake County Office of Education provided a presentation on the Positive Community Norms project.

C. Proclamation: Mayor Disney presented a proclamation designating April 2026 as Child Abuse Prevention Month to representatives from the Children’s Council, Child Welfare Services and the Lake County Office of Education.

D. Proclamation: Mayor Disney presented a proclamation designating April 2026 as Arts, Culture, and Creativity Month to Barbara Clark, Executive Director, and members of the Lake County Arts Council.

VI. PUBLIC HEARING:

VII. COUNCIL BUSINESS:

A. City Manager

1. Fiscal Year 25/26 City
Department Goals
Progress &
Accomplishments
Presentation:

City Manager Ingram presented an update on accomplishments and progress towards the fulfillment of FY 25/26 Departmental Goals.

VIII. CITY COUNCIL COMMUNICATIONS:

A. Travel, Calendar, and
Miscellaneous Reports, if any:

Community Development Director Hejnowicz no report
Police Chief Stoebe offered no report.

Finance Director Dizon offered no report.

Utilities Director Harris offered no report.

Administrative Services Director Buendia offered no report.

Public Works Director Ladd offered no report.

Planning Services Manager Fernandez offered no report.

City Attorney Anderson offered no report.

City Manager Ingram reported that the South Main Street Resiliency Plan was not included in Congressman Thompson’s recommended projects for Congressional Community Funding. Staff will continue to work with the Congressman’s office to identify alternate funding possibilities. He also attended the CalCities Revenue & Tax Committee meeting, where the committee was presented with several bills sponsored by the League that the City will support.

Council Member Costa reported that she is continuing to work on the Splash-In Event with the organizers.

Council Member Parlet reported that Lake APC is installing flashing beacons along the Northshore to improve lighting and safety on Highway 20.

Council Member Price offered no report.

Mayor Pro Tem Mattina advised that there will be an APC/LTA meeting tomorrow in Lower Lake. She attended the CalCities Housing, Community and Economic Development Committee meeting and received legislative updates from CalCities lobbyists.

City Council Minutes of April 7, 2026 Page 4
Mayor Disney advised that the regular meeting of the Lake County Recreation Authority will be cancelled this week. Representatives from the LCRA will be presenting to both City Councils and the Board of Supervisors in the upcoming month.

CLOSED SESSION: Mayor Disney adjourned the meeting to Closed Session at 7:32 p.m. to discuss:

1. Conference with Legal Counsel; Existing Litigation (Gov. Code § 54956.9(d)(1)).

The City Council finds, based on advice from legal counsel, that discussion in open session will prejudice the position of the local agency in the litigation.

In re: National Prescription Opiate Litigation, Case No. 1:17-md-02804-DAP, pending in the U.S. District Court for the Northern District of Ohio.

Plaintiff: City of Lakeport.

Defendants: Associated Pharmacies, Inc (and American Associated Pharmacies); J M Smith Corporation; Louisiana Wholesale Drug Company, Inc.; Morris and Dickson Co.; North Carolina Mutual Wholesale Drug Company, Inc.; and United Natural Foods, Inc. (including its subsidiaries SuperValu and Advantage Logistics).

Report Out of Closed Session: Mayor Disney returned the meeting from Closed Session at 8:01 p.m. to report that the Council voted unanimously, 5-0-0-0, to execute the settlement agreement.

IX. ADJOURNMENT: Mayor Disney adjourned the meeting at 8:01 p.m. _______________________________________
Hilary Britton, Deputy City Clerk
225 PARK STREET • LAKEPORT, CALIFORNIA 95453 • TELEPHONE (707) 263-5615 • FAX (707) 263-8584

CITY OF LAKEPORT
Over 125 years of community
pride, progress and service
4/9/2026
I hereby certify that the attached list of warrants has been audited, extensions are proper, purchase orders have been issued, and department heads have been given the opportunity to review and sign claim forms. ______________________________
Danielle Dizon
Finance Director
4/9/2026 5:00:44 PM Page 1 of 16
Bank Transaction Report
Lakeport Transaction Detail
Issued Date Range: 01/27/2026 - 04/08/2026
Cleared Date Range: -
Cleared
Date Number Description Module Status Type Amount
Issued
Date
Bank Account: 15-0352000798 - POOLED CASH BANK
01/27/2026 02/28/2026 61036 CA BLDG STANDARDS COMMISSION Accounts Payable Cleared Check -81.43 01/27/2026 02/28/2026 61037 COUNTY OF LAKE Accounts Payable Cleared Check -50.00 01/27/2026 02/28/2026 61038 DALE STOEBE Accounts Payable Cleared Check -916.31 01/27/2026 01/31/2026 61039 DANIELLE DIZON Accounts Payable Cleared Check -324.04 01/27/2026 02/28/2026 61040 DEPT OF CONSERVATION Accounts Payable Cleared Check -325.60 01/27/2026 02/28/2026 61041 DIVISION OF STATE ARCHITECT Accounts Payable Cleared Check -32.80 01/27/2026 02/28/2026 61042 KIMBERLY SEARCY Accounts Payable Cleared Check -23.00 01/27/2026 01/31/2026 61043 RYAN COOLEY Accounts Payable Cleared Check -360.00 01/27/2026 03/31/2026 61044 SHAUN JOHNSON Accounts Payable Cleared Check -810.00 01/27/2026 02/28/2026 61045 SWRCB ACCOUNTING OFFICE Accounts Payable Cleared Check -8,712.52 01/27/2026 02/28/2026 61046 TOBY COLEMAN Accounts Payable Cleared Check -185.49 01/27/2026 01/31/2026 61047 TODD FREITAS Accounts Payable Cleared Check -243.00 01/27/2026 01/31/2026 APA008962 ALPHA ANALYTICAL LABORATORIES Accounts Payable Cleared AP Automation -5,292.00 01/27/2026 01/31/2026 APA008963 AmWINS GROUP BENEFITS, INC. Accounts Payable Cleared AP Automation -24,353.05 01/27/2026 01/31/2026 APA008964 APEX TECHNOLOGY MGMT, INC. Accounts Payable Cleared AP Automation -507.80 01/27/2026 01/31/2026 APA008965 ASBURY ENVIRONMENTAL SERVICES Accounts Payable Cleared AP Automation -153.00 01/27/2026 01/31/2026 APA008966 AT&T Accounts Payable Cleared AP Automation -31.78 01/27/2026 01/31/2026 APA008967 AT&T Accounts Payable Cleared AP Automation -224.00 01/27/2026 01/31/2026 APA008968 AT&T Accounts Payable Cleared AP Automation -113.67 01/27/2026 01/31/2026 APA008969 AT&T Accounts Payable Cleared AP Automation -251.45 01/27/2026 01/31/2026 APA008970 AT&T Accounts Payable Cleared AP Automation -251.45 01/27/2026 01/31/2026 APA008971 BANNER BANK Accounts Payable Cleared AP Automation -110,726.00 01/27/2026 01/31/2026 APA008972 CLEAR LAKE ENVIRONMENTAL RESEARCH CENTER Accounts Payable Cleared AP Automation -2,957.00 01/27/2026 01/31/2026 APA008973 CLEARLAKE REDI-MIX INC. Accounts Payable Cleared AP Automation -514.16 01/27/2026 01/31/2026 APA008974 DEEP VALLEY SECURITY Accounts Payable Cleared AP Automation -620.30 01/27/2026 01/31/2026 APA008975 FED EX Accounts Payable Cleared AP Automation -14.92 01/27/2026 01/31/2026 APA008976 FERRELLGAS Accounts Payable Cleared AP Automation -12.00 01/27/2026 01/31/2026 APA008977 INSURANCE AND BENEFITS TRUST OF PORAC Accounts Payable Cleared AP Automation -378.00 01/27/2026 01/31/2026 APA008978 IT'S ABOUT TIME, INC Accounts Payable Cleared AP Automation -50.68 01/27/2026 01/31/2026 APA008979 KATOM RESTAURANT SUPPLY, INC. Accounts Payable Cleared AP Automation -3,810.95 01/27/2026 01/31/2026 APA008980 MANAGEMENT CONNECTIONS Accounts Payable Cleared AP Automation -1,689.08 01/27/2026 01/31/2026 APA008981 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -490.56 01/27/2026 01/31/2026 APA008982 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -407.05 01/27/2026 01/31/2026 APA008983 O'REILLY AUTO PARTS Accounts Payable Cleared AP Automation -56.92 01/27/2026 01/31/2026 APA008984 OWEN EQUIPMENT SALES Accounts Payable Cleared AP Automation -384.60 01/27/2026 01/31/2026 APA008985 PACE ENGINEERING, INC. Accounts Payable Cleared AP Automation -8,111.13 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 2 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
01/27/2026 01/31/2026 APA008986 PACE SUPPLY #03391-00 Accounts Payable Cleared AP Automation -9,795.45 01/27/2026 01/31/2026 APA008987 PG&E Accounts Payable Cleared AP Automation -28,307.15 01/27/2026 01/31/2026 APA008988 PITNEY BOWES INC Accounts Payable Cleared AP Automation -173.70 01/27/2026 01/31/2026 APA008989 PRINTING SYSTEMS Accounts Payable Cleared AP Automation -219.50 01/27/2026 01/31/2026 APA008990 R.S. HUGHES Accounts Payable Cleared AP Automation -83.65 01/27/2026 01/31/2026 APA008991 RB PEST CONTROL Accounts Payable Cleared AP Automation -5,250.00 01/27/2026 01/31/2026 APA008992 SONOMA RSA, INC Accounts Payable Cleared AP Automation -270.00 01/27/2026 01/31/2026 APA008993 STAPLES BUSINESS ADVANTAGE Accounts Payable Cleared AP Automation -507.44 01/27/2026 01/31/2026 APA008994 SUNRISE ENVIRON. SCIENTIFIC Accounts Payable Cleared AP Automation -5,079.01 01/27/2026 01/31/2026 APA008995 THATCHER COMPANY OF CA., INC. Accounts Payable Cleared AP Automation -11,223.03 01/27/2026 01/31/2026 APA008996 THE UPS STORE #5161 Accounts Payable Cleared AP Automation -65.37 01/27/2026 01/31/2026 APA008997 TRACTOR SUPPLY CREDIT PLAN Accounts Payable Cleared AP Automation -93.50 01/27/2026 01/31/2026 APA008998 TRI-CITIES ANSWERING SERVICE Accounts Payable Cleared AP Automation -117.68 01/27/2026 01/31/2026 APA008999 US BANK Accounts Payable Cleared AP Automation -2,155.00 01/27/2026 01/31/2026 APA009000 VESTIS Accounts Payable Cleared AP Automation -119.07 01/27/2026 01/31/2026 APA009001 WEST COAST FIRE & WATER Accounts Payable Cleared AP Automation -3,191.32 02/03/2026 02/28/2026 61052 PINNACLE PUBLIC FINANCE, INC. Accounts Payable Cleared Check -20,193.00 02/03/2026 02/28/2026 61053 AFLAC Accounts Payable Cleared Check -572.27 02/03/2026 02/28/2026 61054 CA STATE DISBURSEMENT UNIT Accounts Payable Cleared Check -318.46 02/03/2026 02/28/2026 61055 FRANCHISE TAX BOARD Accounts Payable Cleared Check -120.00 02/03/2026 02/28/2026 61056 FRANCHISE TAX BOARD Accounts Payable Cleared Check -50.00 02/03/2026 02/28/2026 61057 LAKEPORT EMPLOYEE'S ASSOC Accounts Payable Cleared Check -345.00 02/03/2026 61058 LPOA Accounts Payable Outstanding Check -670.00 02/03/2026 02/28/2026 61059 NATIONWIDE RETIREMENT SOLUTION Accounts Payable Cleared Check -1,425.00 02/03/2026 02/28/2026 61060 VALIC - C/O JP MORGAN CHASE Accounts Payable Cleared Check -2,313.92 02/03/2026 02/28/2026 APA009002 4LEAF, INC. Accounts Payable Cleared AP Automation -3,082.00 02/03/2026 02/28/2026 APA009003 ADAMS ASHBY GROUP, LLC. Accounts Payable Cleared AP Automation -6,427.45 02/03/2026 02/28/2026 APA009004 AMERIGAS - 0920 Accounts Payable Cleared AP Automation -295.39 02/03/2026 02/28/2026 APA009005 ANDREW HEATH Accounts Payable Cleared AP Automation -435.00 02/03/2026 02/28/2026 APA009006 APPLIED BUSINESS SOFTWARE, INC. Accounts Payable Cleared AP Automation -256.07 02/03/2026 02/28/2026 APA009007 AT&T Accounts Payable Cleared AP Automation -224.00 02/03/2026 02/28/2026 APA009008 AT&T CALNET3 Accounts Payable Cleared AP Automation -144.55 02/03/2026 02/28/2026 APA009009 AT&T CALNET3 Accounts Payable Cleared AP Automation -292.80 02/03/2026 02/28/2026 APA009010 AT&T MOBILITY Accounts Payable Cleared AP Automation -40.74 02/03/2026 02/28/2026 APA009011 CENTER FOR HEARING HEALTH, INC Accounts Payable Cleared AP Automation -1,035.00 02/03/2026 02/28/2026 APA009012 CLEARLAKE REDI-MIX INC. Accounts Payable Cleared AP Automation -874.70 02/03/2026 02/28/2026 APA009013 COLANTUONO, HIGHSMITH & WHATLEY, PC Accounts Payable Cleared AP Automation -11,089.20 02/03/2026 02/28/2026 APA009014 COMMUNITY DEVELOPMENT SERVICES Accounts Payable Cleared AP Automation -450.00 02/03/2026 02/28/2026 APA009015 COUNTY OF LAKE - ANIMAL CONTROL Accounts Payable Cleared AP Automation -403.75 02/03/2026 02/28/2026 APA009016 COUNTY OF LAKE - INFO TECH Accounts Payable Cleared AP Automation -2,772.25 02/03/2026 02/28/2026 APA009017 COUNTY OF LAKE - SPECIAL DIST Accounts Payable Cleared AP Automation -96,921.18 02/03/2026 02/28/2026 APA009018 DEPT OF JUSTICE Accounts Payable Cleared AP Automation -175.00 02/03/2026 02/28/2026 APA009019 DOKKEN ENGINEERING Accounts Payable Cleared AP Automation -6,258.65 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 3 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
02/03/2026 02/28/2026 APA009020 EUREKA OXYGEN COMPANY Accounts Payable Cleared AP Automation -237.89 02/03/2026 02/28/2026 APA009021 FERRELLGAS Accounts Payable Cleared AP Automation -729.11 02/03/2026 02/28/2026 APA009022 FLOWERS BY JACKIE LAKEPORT Accounts Payable Cleared AP Automation -288.19 02/03/2026 02/28/2026 APA009023 GARTON TRACTOR Accounts Payable Cleared AP Automation -346.87 02/03/2026 02/28/2026 APA009024 IBCCES Accounts Payable Cleared AP Automation -100.00 02/03/2026 02/28/2026 APA009025 IT'S ABOUT TIME, INC Accounts Payable Cleared AP Automation -103.32 02/03/2026 02/28/2026 APA009026 JOHN TYSON Accounts Payable Cleared AP Automation -400.00 02/03/2026 02/28/2026 APA009027 KIWANIS CLUB OF LAKEPORT Accounts Payable Cleared AP Automation -100.00 02/03/2026 02/28/2026 APA009028 LAKE COUNTY LOCK & SAFE Accounts Payable Cleared AP Automation -543.38 02/03/2026 02/28/2026 APA009029 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -186.92 02/03/2026 02/28/2026 APA009030 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -783.50 02/03/2026 02/28/2026 APA009031 O'REILLY AUTO PARTS Accounts Payable Cleared AP Automation -50.69 02/03/2026 02/28/2026 APA009032 PG&E Accounts Payable Cleared AP Automation -10.87 02/03/2026 02/28/2026 APA009033 PG&E Accounts Payable Cleared AP Automation -25.46 02/03/2026 02/28/2026 APA009034 PG&E Accounts Payable Cleared AP Automation -121.30 02/03/2026 02/28/2026 APA009035 PG&E Accounts Payable Cleared AP Automation -3,189.51 02/03/2026 02/28/2026 APA009036 PG&E Accounts Payable Cleared AP Automation -784.67 02/03/2026 02/28/2026 APA009037 PG&E Accounts Payable Cleared AP Automation -602.51 02/03/2026 02/28/2026 APA009038 PG&E Accounts Payable Cleared AP Automation -33.34 02/03/2026 02/28/2026 APA009039 PG&E Accounts Payable Cleared AP Automation -1,283.92 02/03/2026 02/28/2026 APA009040 PITNEY BOWES INC Accounts Payable Cleared AP Automation -195.82 02/03/2026 02/28/2026 APA009041 PLAZA PAINT & SUPPLIES Accounts Payable Cleared AP Automation -421.45 02/03/2026 02/28/2026 APA009042 RAINBOW AGRICULTURAL SERVICES Accounts Payable Cleared AP Automation -44.51 02/03/2026 02/28/2026 APA009043 RB PEST CONTROL Accounts Payable Cleared AP Automation -3,230.00 02/03/2026 02/28/2026 APA009044 REMIF Accounts Payable Cleared AP Automation -176.90 02/03/2026 02/28/2026 APA009045 REMIF Accounts Payable Cleared AP Automation -102,179.52 02/03/2026 02/28/2026 APA009046 RICOH USA, INC. Accounts Payable Cleared AP Automation -206.35 02/03/2026 02/28/2026 APA009047 SAFETY-KLEEN CORPORATION Accounts Payable Cleared AP Automation -287.33 02/03/2026 02/28/2026 APA009048 STAPLES BUSINESS ADVANTAGE Accounts Payable Cleared AP Automation -622.13 02/03/2026 02/28/2026 APA009049 SUTTER LAKESIDE HOSPITAL Accounts Payable Cleared AP Automation -50.00 02/03/2026 02/28/2026 APA009050 THE STANDARD INSURANCE COMPANY Accounts Payable Cleared AP Automation -1,308.51 02/03/2026 02/28/2026 APA009051 UKIAH PAPER SUPPLY, INC. Accounts Payable Cleared AP Automation -4,605.81 02/03/2026 02/28/2026 APA009052 VERIZON WIRELESS Accounts Payable Cleared AP Automation -38.01 02/03/2026 02/28/2026 APA009053 VESTIS Accounts Payable Cleared AP Automation -39.69 02/03/2026 02/28/2026 APA009054 WESTGATE PETROLEUM CO., INC. Accounts Payable Cleared AP Automation -5,589.92 02/03/2026 02/28/2026 APA009055 WILDA SHOCK Accounts Payable Cleared AP Automation -1,500.00 02/06/2026 02/28/2026 DFT0004164 CALPERS Accounts Payable Cleared Bank Draft -4,959.48 02/06/2026 02/28/2026 DFT0004165 CALPERS Accounts Payable Cleared Bank Draft -5,046.05 02/06/2026 02/28/2026 DFT0004166 CALPERS Accounts Payable Cleared Bank Draft -5,680.61 02/06/2026 02/28/2026 DFT0004167 CALPERS Accounts Payable Cleared Bank Draft -5,834.53 02/06/2026 02/28/2026 DFT0004168 CALPERS Accounts Payable Cleared Bank Draft -3,798.17 02/06/2026 02/28/2026 DFT0004169 CALPERS Accounts Payable Cleared Bank Draft -6,732.25 02/06/2026 02/28/2026 DFT0004170 CALPERS Accounts Payable Cleared Bank Draft -540.38 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 4 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
02/06/2026 02/28/2026 DFT0004171 CALPERS Accounts Payable Cleared Bank Draft -1,465.03 02/06/2026 02/28/2026 DFT0004172 CALPERS Accounts Payable Cleared Bank Draft -48.36 02/06/2026 02/28/2026 DFT0004173 IRS Accounts Payable Cleared Bank Draft -4,742.04 02/06/2026 02/28/2026 DFT0004174 CA EMP DEVELOPMENT DEPT Accounts Payable Cleared Bank Draft -5,600.86 02/06/2026 02/28/2026 DFT0004175 CA EMP DEVELOPMENT DEPT Accounts Payable Cleared Bank Draft -2,123.05 02/06/2026 02/28/2026 DFT0004176 IRS Accounts Payable Cleared Bank Draft -14,195.59 02/06/2026 02/28/2026 DFT0004177 IRS Accounts Payable Cleared Bank Draft -210.80 02/10/2026 02/28/2026 APA009056 ALPHA ANALYTICAL LABORATORIES Accounts Payable Cleared AP Automation -1,259.00 02/10/2026 02/28/2026 APA009057 AMAZON CAPITAL SERVICES, INC. Accounts Payable Cleared AP Automation -103.40 02/10/2026 02/28/2026 APA009058 APEX TECHNOLOGY MGMT, INC. Accounts Payable Cleared AP Automation -2,029.24 02/10/2026 02/28/2026 APA009059 AT&T CALNET3 Accounts Payable Cleared AP Automation -386.05 02/10/2026 02/28/2026 APA009060 AT&T CALNET3 Accounts Payable Cleared AP Automation -95.91 02/10/2026 02/28/2026 APA009061 AT&T CALNET3 Accounts Payable Cleared AP Automation -253.93 02/10/2026 02/28/2026 APA009062 CORE PSYCHOLOGICAL CORPORATION Accounts Payable Cleared AP Automation -500.00 02/10/2026 02/28/2026 APA009063 COUNTY OF LAKE - INFO TECH Accounts Payable Cleared AP Automation -1,054.19 02/10/2026 02/28/2026 APA009064 DAVIS TIRE & AUTO REPAIR Accounts Payable Cleared AP Automation -4,401.94 02/10/2026 02/28/2026 APA009065 DEEP VALLEY SECURITY Accounts Payable Cleared AP Automation -620.30 02/10/2026 02/28/2026 APA009066 FLOCK SAFETY Accounts Payable Cleared AP Automation -25,000.00 02/10/2026 02/28/2026 APA009067 GRANITE CONSTRUCTION COMPANY Accounts Payable Cleared AP Automation -1,501.03 02/10/2026 02/28/2026 APA009068 IRONEDGE GROUP Accounts Payable Cleared AP Automation -624.10 02/10/2026 02/28/2026 APA009069 LAKE COUNTY RECORD BEE Accounts Payable Cleared AP Automation -2,803.78 02/10/2026 02/28/2026 APA009070 LEAGUE OF CALIFORNIA CITIES Accounts Payable Cleared AP Automation -5,135.00 02/10/2026 02/28/2026 APA009071 LEXIS NEXIS RISK SOLUTIONS Accounts Payable Cleared AP Automation -206.00 02/10/2026 02/28/2026 APA009072 MANAGEMENT CONNECTIONS Accounts Payable Cleared AP Automation -1,892.65 02/10/2026 02/28/2026 APA009073 MAVERICK DATA SYSTEMS Accounts Payable Cleared AP Automation -250.00 02/10/2026 02/28/2026 APA009074 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -37.82 02/10/2026 02/28/2026 APA009075 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -58.63 02/10/2026 02/28/2026 APA009076 NICK BARBIERI TRUCKING, LLC Accounts Payable Cleared AP Automation -4,421.97 02/10/2026 02/28/2026 APA009077 NUSO Accounts Payable Cleared AP Automation -279.72 02/10/2026 02/28/2026 APA009078 PACE SUPPLY #03391-00 Accounts Payable Cleared AP Automation -10,659.94 02/10/2026 02/28/2026 APA009079 PAUL R. CURREN Accounts Payable Cleared AP Automation -2,782.50 02/10/2026 02/28/2026 APA009080 PG&E Accounts Payable Cleared AP Automation -135.20 02/10/2026 02/28/2026 APA009081 PG&E Accounts Payable Cleared AP Automation -4,229.41 02/10/2026 02/28/2026 APA009082 PG&E Accounts Payable Cleared AP Automation -66.10 02/10/2026 02/28/2026 APA009083 PHOENIX FIRE DEFENSE Accounts Payable Cleared AP Automation -1,220.98 02/10/2026 02/28/2026 APA009084 POLESTAR COMPUTERS Accounts Payable Cleared AP Automation -55,446.64 02/10/2026 02/28/2026 APA009085 US BANK NATIONAL ASSOCIATION Accounts Payable Cleared AP Automation -56,361.94 02/10/2026 02/28/2026 APA009086 VALLEY INTERNET Accounts Payable Cleared AP Automation -99.00 02/10/2026 02/28/2026 APA009087 VESTIS Accounts Payable Cleared AP Automation -39.69 02/10/2026 02/28/2026 APA009088 WILDA SHOCK Accounts Payable Cleared AP Automation -1,500.00 02/12/2026 02/28/2026 61061 LAKEPORT DISPOSAL, INC. Accounts Payable Cleared Check -111,002.63 02/12/2026 02/28/2026 APA009089 ALPHA ANALYTICAL LABORATORIES Accounts Payable Cleared AP Automation -682.00 02/12/2026 02/28/2026 APA009090 CLEAR LAKE ENVIRONMENTAL RESEARCH CENTER Accounts Payable Cleared AP Automation -3,256.00 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 5 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
02/12/2026 02/28/2026 APA009091 EBA ENGINEERING Accounts Payable Cleared AP Automation -1,477.50 02/12/2026 02/28/2026 APA009092 FERRELLGAS Accounts Payable Cleared AP Automation -466.31 02/12/2026 02/28/2026 APA009093 GHILOTTI CONSTRUCTION COMPANY Accounts Payable Cleared AP Automation -7,462.26 02/12/2026 02/28/2026 APA009094 JACO HVAC & REFRIDGERATION Accounts Payable Cleared AP Automation -977.50 02/12/2026 02/28/2026 APA009095 LASER MAN, INC Accounts Payable Cleared AP Automation -1,035.75 02/12/2026 02/28/2026 APA009096 MATT MAZZEI CHEVROLET Accounts Payable Cleared AP Automation -12.75 02/12/2026 02/28/2026 APA009097 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -229.22 02/12/2026 02/28/2026 APA009098 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -395.66 02/12/2026 02/28/2026 APA009099 ONLINE INFORMATION SERVICES Accounts Payable Cleared AP Automation -33.48 02/12/2026 02/28/2026 APA009100 PACE SUPPLY #03391-00 Accounts Payable Cleared AP Automation -252.91 02/12/2026 02/28/2026 APA009101 PAUL R. CURREN Accounts Payable Cleared AP Automation -13,941.88 02/12/2026 02/28/2026 APA009102 PHOENIX FIRE DEFENSE Accounts Payable Cleared AP Automation -1,010.40 02/12/2026 02/28/2026 APA009103 PITNEY BOWES BANK INC PURCHASE POWER Accounts Payable Cleared AP Automation -502.25 02/12/2026 02/28/2026 APA009104 R.S. HUGHES Accounts Payable Cleared AP Automation -402.51 02/12/2026 02/28/2026 APA009105 SPENCER JOHNSON Accounts Payable Cleared AP Automation -1,123.92 02/12/2026 02/28/2026 APA009106 VERIZON WIRELESS Accounts Payable Cleared AP Automation -955.64 02/12/2026 02/28/2026 APA009107 ZUMAR INDUSTRIES, INC. Accounts Payable Cleared AP Automation -1,321.41 02/19/2026 02/28/2026 61070 ALI'S KITCHEN Accounts Payable Cleared Check -345.65 02/19/2026 03/31/2026 61071 JENNIFER BAKER Accounts Payable Cleared Check -44.17 02/19/2026 02/28/2026 61072 JUAN ALTAMIRANO Accounts Payable Cleared Check -69.00 02/19/2026 03/31/2026 61073 JUAN VILLA Accounts Payable Cleared Check -23.00 02/19/2026 02/28/2026 61074 KEVIN M. INGRAM Accounts Payable Cleared Check -128.00 02/19/2026 03/31/2026 61075 MARY CLAYBON Accounts Payable Cleared Check -140.00 02/19/2026 03/31/2026 61076 NATHAN MAXMAN Accounts Payable Cleared Check -140.00 02/19/2026 03/31/2026 61077 SHAUN JOHNSON Accounts Payable Cleared Check -87.00 02/19/2026 03/31/2026 61078 TODD FREITAS Accounts Payable Cleared Check -23.00 02/19/2026 02/28/2026 APA009108 ACME RIGGING & SUPPLY COMPANY Accounts Payable Cleared AP Automation -147.86 02/19/2026 02/28/2026 APA009109 AMAZON CAPITAL SERVICES, INC. Accounts Payable Cleared AP Automation -2,146.98 02/19/2026 02/28/2026 APA009110 APEX TECHNOLOGY MGMT, INC. Accounts Payable Cleared AP Automation -122.85 02/19/2026 02/28/2026 APA009111 AT&T Accounts Payable Cleared AP Automation -3,374.64 02/19/2026 02/28/2026 APA009112 AT&T Accounts Payable Cleared AP Automation -31.76 02/19/2026 02/28/2026 APA009113 AT&T Accounts Payable Cleared AP Automation -113.61 02/19/2026 02/28/2026 APA009114 AT&T Accounts Payable Cleared AP Automation -251.45 02/19/2026 02/28/2026 APA009115 AT&T Accounts Payable Cleared AP Automation -251.45 02/19/2026 02/28/2026 APA009116 CLEAR LAKE ENVIRONMENTAL RESEARCH CENTER Accounts Payable Cleared AP Automation -934.00 02/19/2026 02/28/2026 APA009117 COMMUNITY DEVELOPMENT SERVICES Accounts Payable Cleared AP Automation -1,725.00 02/19/2026 02/28/2026 APA009118 COMPREHENSIVE DRUG TESTING, INC Accounts Payable Cleared AP Automation -273.00 02/19/2026 02/28/2026 APA009119 EUREKA OXYGEN COMPANY Accounts Payable Cleared AP Automation -26.52 02/19/2026 02/28/2026 APA009120 FLOWERS BY JACKIE LAKEPORT Accounts Payable Cleared AP Automation -105.49 02/19/2026 02/28/2026 APA009121 GHILOTTI CONSTRUCTION COMPANY Accounts Payable Cleared AP Automation -76,442.35 02/19/2026 02/28/2026 APA009122 GOVINVEST INC. Accounts Payable Cleared AP Automation -18,742.50 02/19/2026 02/28/2026 APA009123 INSURANCE AND BENEFITS TRUST OF PORAC Accounts Payable Cleared AP Automation -378.00 02/19/2026 02/28/2026 APA009124 LAKE COUNTY ELECTRIC SUPPLY Accounts Payable Cleared AP Automation -10.84 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 6 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
02/19/2026 02/28/2026 APA009125 LAKE COUNTY RECORD BEE Accounts Payable Cleared AP Automation -240.31 02/19/2026 02/28/2026 APA009126 LEAGUE OF CALIFORNIA CITIES Accounts Payable Cleared AP Automation -85.00 02/19/2026 02/28/2026 APA009127 LEXIS NEXIS RISK SOLUTIONS Accounts Payable Cleared AP Automation -206.00 02/19/2026 02/28/2026 APA009128 MANAGEMENT CONNECTIONS Accounts Payable Cleared AP Automation -7,006.18 02/19/2026 02/28/2026 APA009129 MCCi, LLC Accounts Payable Cleared AP Automation -4,292.75 02/19/2026 02/28/2026 APA009130 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -214.19 02/19/2026 02/28/2026 APA009131 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -187.62 02/19/2026 02/28/2026 APA009132 PACE ENGINEERING, INC. Accounts Payable Cleared AP Automation -378.25 02/19/2026 02/28/2026 APA009133 PACE SUPPLY #03391-00 Accounts Payable Cleared AP Automation -3,890.69 02/19/2026 02/28/2026 APA009134 PHOENIX FIRE DEFENSE Accounts Payable Cleared AP Automation -1,691.84 02/19/2026 02/28/2026 APA009135 R.S. HUGHES Accounts Payable Cleared AP Automation -379.46 02/19/2026 02/28/2026 APA009136 REGAL CHLORINATORS Accounts Payable Cleared AP Automation -1,121.81 02/19/2026 02/28/2026 APA009137 RICOH - WELLS FARGO VENDOR FIN SVCS, LLC Accounts Payable Cleared AP Automation -570.84 02/19/2026 02/28/2026 APA009138 RICOH USA, INC. Accounts Payable Cleared AP Automation -107.49 02/19/2026 02/28/2026 APA009139 SHN CONSULTING ENGINEERS & GEO Accounts Payable Cleared AP Automation -2,230.00 02/19/2026 02/28/2026 APA009140 SONOMA RSA, INC Accounts Payable Cleared AP Automation -1,000.00 02/19/2026 02/28/2026 APA009141 THATCHER COMPANY OF CA., INC. Accounts Payable Cleared AP Automation -7,897.51 02/19/2026 02/28/2026 APA009142 TRI-CITIES ANSWERING SERVICE Accounts Payable Cleared AP Automation -179.07 02/19/2026 02/28/2026 APA009143 TRUIST GOVERNMENTAL FINANCE Accounts Payable Cleared AP Automation -20,577.01 02/19/2026 02/28/2026 APA009144 U.S. BANK CORPORATE PAYMENT SYSTEMS Accounts Payable Cleared AP Automation -13,992.38 02/19/2026 02/28/2026 APA009145 USA BLUE BOOK Accounts Payable Cleared AP Automation -2,239.29 02/19/2026 02/28/2026 APA009146 VERIZON WIRELESS Accounts Payable Cleared AP Automation -1,066.61 02/19/2026 02/28/2026 APA009147 VESTIS Accounts Payable Cleared AP Automation -79.38 02/19/2026 02/28/2026 APA009148 WECO INDUSTRIES Accounts Payable Cleared AP Automation -582.17 02/20/2026 03/31/2026 61062 AFLAC Accounts Payable Cleared Check -572.27 02/20/2026 02/28/2026 61063 CA STATE DISBURSEMENT UNIT Accounts Payable Cleared Check -318.46 02/20/2026 03/31/2026 61064 FRANCHISE TAX BOARD Accounts Payable Cleared Check -120.00 02/20/2026 02/28/2026 61065 LAKEPORT EMPLOYEE'S ASSOC Accounts Payable Cleared Check -345.00 02/20/2026 02/28/2026 61066 LEGALSHIELD Accounts Payable Cleared Check -357.25 02/20/2026 61067 LPOA Accounts Payable Outstanding Check -670.00 02/20/2026 02/28/2026 61068 NATIONWIDE RETIREMENT SOLUTION Accounts Payable Cleared Check -1,425.00 02/20/2026 02/28/2026 61069 VALIC - C/O JP MORGAN CHASE Accounts Payable Cleared Check -2,363.92 02/20/2026 02/28/2026 DFT0004178 CALPERS Accounts Payable Cleared Bank Draft -4,387.39 02/20/2026 02/28/2026 DFT0004179 CALPERS Accounts Payable Cleared Bank Draft -4,463.98 02/20/2026 02/28/2026 DFT0004180 CALPERS Accounts Payable Cleared Bank Draft -5,700.44 02/20/2026 02/28/2026 DFT0004181 CALPERS Accounts Payable Cleared Bank Draft -5,854.92 02/20/2026 02/28/2026 DFT0004182 CALPERS Accounts Payable Cleared Bank Draft -3,781.78 02/20/2026 02/28/2026 DFT0004183 CALPERS Accounts Payable Cleared Bank Draft -6,703.19 02/20/2026 02/28/2026 DFT0004184 CALPERS Accounts Payable Cleared Bank Draft -540.38 02/20/2026 02/28/2026 DFT0004185 CALPERS Accounts Payable Cleared Bank Draft -1,465.03 02/20/2026 02/28/2026 DFT0004186 CALPERS Accounts Payable Cleared Bank Draft -48.36 02/20/2026 02/28/2026 DFT0004187 IRS Accounts Payable Cleared Bank Draft -4,724.52 02/20/2026 02/28/2026 DFT0004188 CA EMP DEVELOPMENT DEPT Accounts Payable Cleared Bank Draft -5,460.27 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 7 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
02/20/2026 02/28/2026 DFT0004189 CA EMP DEVELOPMENT DEPT Accounts Payable Cleared Bank Draft -2,107.40 02/20/2026 02/28/2026 DFT0004190 IRS Accounts Payable Cleared Bank Draft -13,920.78 02/20/2026 02/28/2026 DFT0004191 IRS Accounts Payable Cleared Bank Draft -322.40 02/24/2026 02/28/2026 APA009149 AmWINS GROUP BENEFITS, INC. Accounts Payable Cleared AP Automation -25,434.32 02/24/2026 02/28/2026 APA009150 CORO MEDICAL, LLC Accounts Payable Cleared AP Automation -669.91 02/24/2026 02/28/2026 APA009151 COUNTY OF LAKE - ANIMAL CONTROL Accounts Payable Cleared AP Automation -320.00 02/24/2026 02/28/2026 APA009152 COUNTY OF LAKE - INFO TECH Accounts Payable Cleared AP Automation -1,632.63 02/24/2026 02/28/2026 APA009153 DEPT OF JUSTICE Accounts Payable Cleared AP Automation -140.00 02/24/2026 02/28/2026 APA009154 FED EX Accounts Payable Cleared AP Automation -16.69 02/24/2026 02/28/2026 APA009155 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -39.67 02/24/2026 02/28/2026 APA009156 O'REILLY AUTO PARTS Accounts Payable Cleared AP Automation -87.07 02/24/2026 02/28/2026 APA009157 PEOPLE SERVICES, INC. Accounts Payable Cleared AP Automation -200.00 02/24/2026 02/28/2026 APA009158 PITNEY BOWES GLOBAL FINANCIAL SVCS Accounts Payable Cleared AP Automation -169.20 02/24/2026 02/28/2026 APA009159 RICOH - WELLS FARGO VENDOR FIN SVCS, LLC Accounts Payable Cleared AP Automation -491.23 02/24/2026 02/28/2026 APA009160 RICOH USA, INC. Accounts Payable Cleared AP Automation -195.14 02/24/2026 02/28/2026 APA009161 SPENCER JOHNSON Accounts Payable Cleared AP Automation -300.00 02/24/2026 02/28/2026 APA009162 US BANK NATIONAL ASSOCIATION Accounts Payable Cleared AP Automation -62,702.59 02/24/2026 02/28/2026 APA009163 VERIZON WIRELESS Accounts Payable Cleared AP Automation -557.20 02/24/2026 02/28/2026 APA009164 WESTGATE PETROLEUM CO., INC. Accounts Payable Cleared AP Automation -2,768.47 02/25/2026 61081 JONATAN MORENO Accounts Payable Outstanding Check -23.00 02/25/2026 03/31/2026 61082 KIMBERLY SEARCY Accounts Payable Cleared Check -23.00 02/25/2026 03/31/2026 61083 KIMLEY-HORN & ASSOCIATES, INC Accounts Payable Cleared Check -250.00 02/25/2026 61084 OLIVIA GRUPP Accounts Payable Outstanding Check -200.00 02/25/2026 61085 RON LADD Accounts Payable Outstanding Check -200.00 02/25/2026 61086 SHAUN JOHNSON Accounts Payable Outstanding Check -23.00 03/04/2026 03/31/2026 APA009165 ADVANCED SECURITY SYSTEMS Accounts Payable Cleared AP Automation -115.00 03/04/2026 03/31/2026 APA009166 AT&T MOBILITY Accounts Payable Cleared AP Automation -40.74 03/04/2026 03/31/2026 APA009167 CRITICAL REACH, INC. Accounts Payable Cleared AP Automation -300.00 03/04/2026 03/31/2026 APA009168 DAVIS TIRE & AUTO REPAIR Accounts Payable Cleared AP Automation -160.00 03/04/2026 03/31/2026 APA009169 DEPT OF JUSTICE Accounts Payable Cleared AP Automation -210.00 03/04/2026 03/31/2026 APA009170 EUREKA OXYGEN COMPANY Accounts Payable Cleared AP Automation -6.29 03/04/2026 03/31/2026 APA009171 FED EX Accounts Payable Cleared AP Automation -20.73 03/04/2026 03/31/2026 APA009172 FERRELLGAS Accounts Payable Cleared AP Automation -990.78 03/04/2026 03/31/2026 APA009173 INTERNATIONAL ASSOC. OF CHIEFS OF POLICE Accounts Payable Cleared AP Automation -85.00 03/04/2026 03/31/2026 APA009174 IRONEDGE GROUP Accounts Payable Cleared AP Automation -625.66 03/04/2026 03/31/2026 APA009175 JACO HVAC & REFRIDGERATION Accounts Payable Cleared AP Automation -1,571.22 03/04/2026 03/31/2026 APA009176 JONES TOWING Accounts Payable Cleared AP Automation -200.00 03/04/2026 03/31/2026 APA009177 L. N. CURTIS & SONS Accounts Payable Cleared AP Automation -1,559.52 03/04/2026 03/31/2026 APA009178 LC ACTION POLICE SUPPLY, LTD. Accounts Payable Cleared AP Automation -2,478.80 03/04/2026 03/31/2026 APA009179 MANAGEMENT CONNECTIONS Accounts Payable Cleared AP Automation -2,603.70 03/04/2026 03/31/2026 APA009180 MEDIACOM Accounts Payable Cleared AP Automation -317.13 03/04/2026 03/31/2026 APA009181 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -212.10 03/04/2026 03/31/2026 APA009182 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -761.14 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 8 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
03/04/2026 03/31/2026 APA009183 OCCU-MED, LTD. Accounts Payable Cleared AP Automation -5,800.00 03/04/2026 03/31/2026 APA009184 PAUL R. CURREN Accounts Payable Cleared AP Automation -4,107.50 03/04/2026 03/31/2026 APA009185 PG&E Accounts Payable Cleared AP Automation -10.75 03/04/2026 03/31/2026 APA009186 PRECISION WIRELESS SERVICE Accounts Payable Cleared AP Automation -262.50 03/04/2026 03/31/2026 APA009187 RICOH USA, INC. Accounts Payable Cleared AP Automation -9.76 03/04/2026 03/31/2026 APA009188 SEBIS DIRECT, INC - POSTAGE Accounts Payable Cleared AP Automation -3,400.00 03/04/2026 03/31/2026 APA009189 SEBIS DIRECT, INC. - PRINTING Accounts Payable Cleared AP Automation -507.78 03/04/2026 03/31/2026 APA009190 SHRED-IT USA LLC Accounts Payable Cleared AP Automation -225.10 03/04/2026 03/31/2026 APA009191 THE UPS STORE #5161 Accounts Payable Cleared AP Automation -75.99 03/04/2026 03/31/2026 APA009192 VALLEY INTERNET Accounts Payable Cleared AP Automation -99.00 03/04/2026 03/31/2026 APA009193 WESTGATE PETROLEUM CO., INC. Accounts Payable Cleared AP Automation -3,214.12 03/04/2026 03/31/2026 APA009194 WMH CORPORATION Accounts Payable Cleared AP Automation -7,770.00 03/06/2026 03/31/2026 61087 AFLAC Accounts Payable Cleared Check -580.98 03/06/2026 03/31/2026 61088 CA STATE DISBURSEMENT UNIT Accounts Payable Cleared Check -318.46 03/06/2026 03/31/2026 61089 FRANCHISE TAX BOARD Accounts Payable Cleared Check -120.00 03/06/2026 03/31/2026 61090 LAKEPORT EMPLOYEE'S ASSOC Accounts Payable Cleared Check -345.00 03/06/2026 61091 LPOA Accounts Payable Outstanding Check -670.00 03/06/2026 03/31/2026 61092 NATIONWIDE RETIREMENT SOLUTION Accounts Payable Cleared Check -1,425.00 03/06/2026 03/31/2026 61093 VALIC - C/O JP MORGAN CHASE Accounts Payable Cleared Check -2,363.92 03/06/2026 03/31/2026 DFT0004192 CALPERS Accounts Payable Cleared Bank Draft -4,922.16 03/06/2026 03/31/2026 DFT0004193 CALPERS Accounts Payable Cleared Bank Draft -5,008.09 03/06/2026 03/31/2026 DFT0004194 CALPERS Accounts Payable Cleared Bank Draft -5,712.53 03/06/2026 03/31/2026 DFT0004195 CALPERS Accounts Payable Cleared Bank Draft -5,867.32 03/06/2026 03/31/2026 DFT0004196 CALPERS Accounts Payable Cleared Bank Draft -3,623.20 03/06/2026 03/31/2026 DFT0004197 CALPERS Accounts Payable Cleared Bank Draft -6,422.12 03/06/2026 03/31/2026 DFT0004198 CALPERS Accounts Payable Cleared Bank Draft -540.38 03/06/2026 03/31/2026 DFT0004199 CALPERS Accounts Payable Cleared Bank Draft -1,465.03 03/06/2026 03/31/2026 DFT0004200 CALPERS Accounts Payable Cleared Bank Draft -48.36 03/06/2026 03/31/2026 DFT0004201 IRS Accounts Payable Cleared Bank Draft -4,846.98 03/06/2026 03/31/2026 DFT0004202 CA EMP DEVELOPMENT DEPT Accounts Payable Cleared Bank Draft -6,076.19 03/06/2026 03/31/2026 DFT0004203 CA EMP DEVELOPMENT DEPT Accounts Payable Cleared Bank Draft -2,170.12 03/06/2026 03/31/2026 DFT0004204 IRS Accounts Payable Cleared Bank Draft -15,071.50 03/06/2026 03/31/2026 DFT0004205 IRS Accounts Payable Cleared Bank Draft -192.20 03/09/2026 03/31/2026 APA009195 ADVANCED SECURITY SYSTEMS Accounts Payable Cleared AP Automation -91.00 03/09/2026 03/31/2026 APA009196 ALPHA ANALYTICAL LABORATORIES Accounts Payable Cleared AP Automation -341.00 03/09/2026 03/31/2026 APA009197 AT&T Accounts Payable Cleared AP Automation -214.00 03/09/2026 03/31/2026 APA009198 AT&T CALNET3 Accounts Payable Cleared AP Automation -143.99 03/09/2026 03/31/2026 APA009199 AT&T CALNET3 Accounts Payable Cleared AP Automation -253.08 03/09/2026 03/31/2026 APA009200 AT&T CALNET3 Accounts Payable Cleared AP Automation -95.49 03/09/2026 03/31/2026 APA009201 AT&T CALNET3 Accounts Payable Cleared AP Automation -385.14 03/09/2026 03/31/2026 APA009202 CLEAR LAKE ENVIRONMENTAL RESEARCH CENTER Accounts Payable Cleared AP Automation -1,965.00 03/09/2026 03/31/2026 APA009203 CLEARLAKE REDI-MIX INC. Accounts Payable Cleared AP Automation -4,207.54 03/09/2026 03/31/2026 APA009204 COLANTUONO, HIGHSMITH & WHATLEY, PC Accounts Payable Cleared AP Automation -15,028.60 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 9 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
03/09/2026 03/31/2026 APA009205 DEEP VALLEY SECURITY Accounts Payable Cleared AP Automation -830.30 03/09/2026 03/31/2026 APA009206 DOKKEN ENGINEERING Accounts Payable Cleared AP Automation -788.50 03/09/2026 03/31/2026 APA009207 ENTERPRISE - EAN SERVICES, LLC Accounts Payable Cleared AP Automation -214.94 03/09/2026 03/31/2026 APA009208 ENTERPRISE - TOLL Accounts Payable Cleared AP Automation -13.45 03/09/2026 03/31/2026 APA009209 ENVIRO-EQUIPMENT INC Accounts Payable Cleared AP Automation -243.90 03/09/2026 03/31/2026 APA009210 ESRI Accounts Payable Cleared AP Automation -3,000.00 03/09/2026 03/31/2026 APA009211 FERRELLGAS Accounts Payable Cleared AP Automation -796.67 03/09/2026 03/31/2026 APA009212 HALENHARDY Accounts Payable Cleared AP Automation -3,077.54 03/09/2026 03/31/2026 APA009213 JACO HVAC & REFRIDGERATION Accounts Payable Cleared AP Automation -193.94 03/09/2026 03/31/2026 APA009214 JAMES DAY CONSTRUCTION, INC. Accounts Payable Cleared AP Automation -1,602.00 03/09/2026 03/31/2026 APA009215 MANAGEMENT CONNECTIONS Accounts Payable Cleared AP Automation -2,449.50 03/09/2026 03/31/2026 APA009216 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -570.89 03/09/2026 03/31/2026 APA009217 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -348.51 03/09/2026 03/31/2026 APA009218 NTU TECHNOLOGIES INC Accounts Payable Cleared AP Automation -5,339.50 03/09/2026 03/31/2026 APA009219 NUSO Accounts Payable Cleared AP Automation -279.72 03/09/2026 03/31/2026 APA009220 ONLINE INFORMATION SERVICES Accounts Payable Cleared AP Automation -48.36 03/09/2026 03/31/2026 APA009221 PACE SUPPLY #03391-00 Accounts Payable Cleared AP Automation -12,474.80 03/09/2026 03/31/2026 APA009222 PAUL R. CURREN Accounts Payable Cleared AP Automation -15,253.44 03/09/2026 03/31/2026 APA009223 PG&E Accounts Payable Cleared AP Automation -40,859.55 03/09/2026 03/31/2026 APA009224 PG&E Accounts Payable Cleared AP Automation -1,297.92 03/09/2026 03/31/2026 APA009225 PG&E Accounts Payable Cleared AP Automation -30.19 03/09/2026 03/31/2026 APA009226 PG&E Accounts Payable Cleared AP Automation -2,825.97 03/09/2026 03/31/2026 APA009227 PG&E Accounts Payable Cleared AP Automation -923.77 03/09/2026 03/31/2026 APA009228 PG&E Accounts Payable Cleared AP Automation -67.24 03/09/2026 03/31/2026 APA009229 PG&E Accounts Payable Cleared AP Automation -488.98 03/09/2026 03/31/2026 APA009230 PG&E Accounts Payable Cleared AP Automation -135.65 03/09/2026 03/31/2026 APA009231 PG&E Accounts Payable Cleared AP Automation -2,642.55 03/09/2026 03/31/2026 APA009232 PG&E Accounts Payable Cleared AP Automation -103.97 03/09/2026 03/31/2026 APA009233 R.B. PETERS Accounts Payable Cleared AP Automation -51.65 03/09/2026 03/31/2026 APA009234 RB PEST CONTROL Accounts Payable Cleared AP Automation -100.00 03/09/2026 03/31/2026 APA009235 SHN CONSULTING ENGINEERS & GEO Accounts Payable Cleared AP Automation -3,837.50 03/09/2026 03/31/2026 APA009236 THE UPS STORE #5161 Accounts Payable Cleared AP Automation -106.14 03/09/2026 03/31/2026 APA009237 THOMAS & ASSOCIATES Accounts Payable Cleared AP Automation -23,570.24 03/09/2026 03/31/2026 APA009238 USA BLUE BOOK Accounts Payable Cleared AP Automation -229.81 03/09/2026 03/31/2026 APA009239 VESTIS Accounts Payable Cleared AP Automation -79.38 03/09/2026 03/31/2026 APA009240 VISIT LAKE COUNTY CALIFORNIA Accounts Payable Cleared AP Automation -8,890.18 03/09/2026 03/31/2026 APA009241 WILDA SHOCK Accounts Payable Cleared AP Automation -1,500.00 03/11/2026 03/31/2026 61094 COUNTY OF LAKE Accounts Payable Cleared Check -50.00 03/11/2026 03/31/2026 61095 DANIELLE DIZON Accounts Payable Cleared Check -383.86 03/11/2026 03/31/2026 61096 JONATAN MORENO Accounts Payable Cleared Check -162.00 03/11/2026 61097 STEWART TITLE OF CALIFORNIA, INC Accounts Payable Outstanding Check -15,030.00 03/11/2026 03/31/2026 61098 SWRCB Accounts Payable Cleared Check -201.00 03/11/2026 03/31/2026 61099 UNITED MECHANICAL Accounts Payable Cleared Check -466.98 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 10 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
03/12/2026 03/31/2026 61100 LAKEPORT DISPOSAL, INC. Accounts Payable Cleared Check -127,287.77 03/12/2026 03/31/2026 REFAPA008997 TRACTOR SUPPLY CREDIT PLAN Accounts Payable Cleared Bank Draft Reversal 93.50 03/18/2026 03/31/2026 APA009242 ADVANCED SECURITY SYSTEMS Accounts Payable Cleared AP Automation -7,893.68 03/18/2026 03/31/2026 APA009243 AT&T Accounts Payable Cleared AP Automation -3,374.64 03/18/2026 03/31/2026 APA009244 AT&T CALNET3 Accounts Payable Cleared AP Automation -299.02 03/18/2026 03/31/2026 APA009245 CALIFORNIA CHAMBER OF COMMERCE Accounts Payable Cleared AP Automation -119.00 03/18/2026 03/31/2026 APA009246 CLEAR LAKE ENVIRONMENTAL RESEARCH CENTER Accounts Payable Cleared AP Automation -2,868.00 03/18/2026 03/31/2026 APA009247 CLEARLAKE REDI-MIX INC. Accounts Payable Cleared AP Automation -1,592.10 03/18/2026 03/31/2026 APA009248 COMMUNITY DEVELOPMENT SERVICES Accounts Payable Cleared AP Automation -750.00 03/18/2026 03/31/2026 APA009249 CORE PSYCHOLOGICAL CORPORATION Accounts Payable Cleared AP Automation -500.00 03/18/2026 03/31/2026 APA009250 COUNTY OF LAKE - ANIMAL CONTROL Accounts Payable Cleared AP Automation -745.75 03/18/2026 03/31/2026 APA009251 DASH MEDICAL GLOVES Accounts Payable Cleared AP Automation -567.93 03/18/2026 03/31/2026 APA009252 EUREKA OXYGEN COMPANY Accounts Payable Cleared AP Automation -141.82 03/18/2026 03/31/2026 APA009253 GOT POWER, INC Accounts Payable Cleared AP Automation -2,415.15 03/18/2026 03/31/2026 APA009254 JAMES HALEY Accounts Payable Cleared AP Automation -50.00 03/18/2026 03/31/2026 APA009255 KELSEYVILLE LUMBER Accounts Payable Cleared AP Automation -9.32 03/18/2026 03/31/2026 APA009256 LAKEPORT FENWAY AVENUE LP Accounts Payable Cleared AP Automation -1,574,997.98 03/18/2026 03/31/2026 APA009257 LEE'S SPORTING GOODS Accounts Payable Cleared AP Automation -36.98 03/18/2026 03/31/2026 APA009258 LEXIS NEXIS RISK SOLUTIONS Accounts Payable Cleared AP Automation -206.00 03/18/2026 03/31/2026 APA009259 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -287.52 03/18/2026 03/31/2026 APA009260 MUNISERVICES Accounts Payable Cleared AP Automation -683.11 03/18/2026 03/31/2026 APA009261 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -237.32 03/18/2026 03/31/2026 APA009262 NICK BARBIERI TRUCKING, LLC Accounts Payable Cleared AP Automation -1,256.21 03/18/2026 03/31/2026 APA009263 PG&E Accounts Payable Cleared AP Automation -26.28 03/18/2026 03/31/2026 APA009264 RAINBOW AGRICULTURAL SERVICES Accounts Payable Cleared AP Automation -171.84 03/18/2026 03/31/2026 APA009265 RB PEST CONTROL Accounts Payable Cleared AP Automation -100.00 03/18/2026 03/31/2026 APA009266 RECDESK, LLC Accounts Payable Cleared AP Automation -3,097.50 03/18/2026 03/31/2026 APA009267 REMIF Accounts Payable Cleared AP Automation -176.90 03/18/2026 03/31/2026 APA009268 REMIF Accounts Payable Cleared AP Automation -103,967.56 03/18/2026 03/31/2026 APA009269 RICOH - WELLS FARGO VENDOR FIN SVCS, LLC Accounts Payable Cleared AP Automation -570.84 03/18/2026 03/31/2026 APA009270 RICOH USA, INC. Accounts Payable Cleared AP Automation -374.81 03/18/2026 03/31/2026 APA009271 SANTA ROSA JUNIOR COLLEGE Accounts Payable Cleared AP Automation -228.00 03/18/2026 03/31/2026 APA009272 SEBIS DIRECT, INC. - PRINTING Accounts Payable Cleared AP Automation -508.33 03/18/2026 03/31/2026 APA009273 SHRED-IT USA LLC Accounts Payable Cleared AP Automation -221.76 03/18/2026 03/31/2026 APA009274 STAPLES BUSINESS ADVANTAGE Accounts Payable Cleared AP Automation -568.30 03/18/2026 03/31/2026 APA009275 SUN RIDGE SYSTEMS, INC. Accounts Payable Cleared AP Automation -5,250.00 03/18/2026 03/31/2026 APA009276 TRACTOR SUPPLY CREDIT PLAN Accounts Payable Cleared AP Automation -93.50 03/18/2026 03/31/2026 APA009277 TRI-CITIES ANSWERING SERVICE Accounts Payable Cleared AP Automation -118.43 03/18/2026 03/31/2026 APA009278 VALLEY TOXICOLOGY SERVICES INC Accounts Payable Cleared AP Automation -300.00 03/18/2026 03/31/2026 APA009279 VERIZON WIRELESS Accounts Payable Cleared AP Automation -1,513.52 03/18/2026 03/31/2026 APA009280 VESTIS Accounts Payable Cleared AP Automation -79.38 03/18/2026 03/31/2026 APA009281 WESTGATE PETROLEUM CO., INC. Accounts Payable Cleared AP Automation -6,850.09 03/18/2026 03/31/2026 APA009282 WINE COUNTRY POWER, INC. Accounts Payable Cleared AP Automation -2,641.80 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 11 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
03/20/2026 61101 AFLAC Accounts Payable Outstanding Check -589.69 03/20/2026 03/31/2026 61102 CA STATE DISBURSEMENT UNIT Accounts Payable Cleared Check -318.46 03/20/2026 61103 FRANCHISE TAX BOARD Accounts Payable Outstanding Check -120.00 03/20/2026 61104 LAKEPORT EMPLOYEE'S ASSOC Accounts Payable Outstanding Check -345.00 03/20/2026 03/31/2026 61105 LEGALSHIELD Accounts Payable Cleared Check -357.25 03/20/2026 61106 LPOA Accounts Payable Outstanding Check -580.00 03/20/2026 03/31/2026 61107 NATIONWIDE RETIREMENT SOLUTION Accounts Payable Cleared Check -1,425.00 03/20/2026 03/31/2026 61108 VALIC - C/O JP MORGAN CHASE Accounts Payable Cleared Check -2,363.92 03/20/2026 03/31/2026 DFT0004207 CALPERS Accounts Payable Cleared Bank Draft -4,466.85 03/20/2026 03/31/2026 DFT0004208 CALPERS Accounts Payable Cleared Bank Draft -4,544.80 03/20/2026 03/31/2026 DFT0004209 CALPERS Accounts Payable Cleared Bank Draft -5,712.53 03/20/2026 03/31/2026 DFT0004210 CALPERS Accounts Payable Cleared Bank Draft -5,867.33 03/20/2026 03/31/2026 DFT0004211 CALPERS Accounts Payable Cleared Bank Draft -3,909.18 03/20/2026 03/31/2026 DFT0004212 CALPERS Accounts Payable Cleared Bank Draft -6,929.01 03/20/2026 03/31/2026 DFT0004213 CALPERS Accounts Payable Cleared Bank Draft -540.38 03/20/2026 03/31/2026 DFT0004214 CALPERS Accounts Payable Cleared Bank Draft -1,465.03 03/20/2026 03/31/2026 DFT0004215 CALPERS Accounts Payable Cleared Bank Draft -48.36 03/20/2026 03/31/2026 DFT0004216 IRS Accounts Payable Cleared Bank Draft -4,929.48 03/20/2026 03/31/2026 DFT0004217 CA EMP DEVELOPMENT DEPT Accounts Payable Cleared Bank Draft -6,144.51 03/20/2026 03/31/2026 DFT0004218 CA EMP DEVELOPMENT DEPT Accounts Payable Cleared Bank Draft -2,199.27 03/20/2026 03/31/2026 DFT0004219 IRS Accounts Payable Cleared Bank Draft -15,352.19 03/20/2026 03/31/2026 DFT0004220 IRS Accounts Payable Cleared Bank Draft -291.40 03/23/2026 03/31/2026 61109 LAKE ORTHODONTICS Accounts Payable Cleared Check -1,000.00 03/23/2026 03/31/2026 61110 MARIE SCHRADER Accounts Payable Cleared Check -2,933.58 03/23/2026 03/31/2026 61110 MARIE SCHRADER Reversal Accounts Payable Cleared Check Reversal 2,933.58 03/23/2026 03/31/2026 61111 MARY CLAYBON Accounts Payable Cleared Check -264.30 03/23/2026 61112 OLIVIA GRUPP Accounts Payable Outstanding Check -105.44 03/23/2026 03/31/2026 APA009283 AMAZON CAPITAL SERVICES, INC. Accounts Payable Cleared AP Automation -1,184.65 03/23/2026 03/31/2026 APA009284 APEX TECHNOLOGY MGMT, INC. Accounts Payable Cleared AP Automation -2,029.24 03/23/2026 03/31/2026 APA009285 AT&T Accounts Payable Cleared AP Automation -251.45 03/23/2026 03/31/2026 APA009286 AT&T Accounts Payable Cleared AP Automation -113.61 03/23/2026 03/31/2026 APA009287 AT&T Accounts Payable Cleared AP Automation -251.45 03/23/2026 03/31/2026 APA009288 AT&T Accounts Payable Cleared AP Automation -31.76 03/23/2026 03/31/2026 APA009289 FERRELLGAS Accounts Payable Cleared AP Automation -31.45 03/23/2026 03/31/2026 APA009290 GHILOTTI CONSTRUCTION COMPANY Accounts Payable Cleared AP Automation -5,328.75 03/23/2026 03/31/2026 APA009291 IT'S ABOUT TIME, INC Accounts Payable Cleared AP Automation -41.82 03/23/2026 03/31/2026 APA009292 LAKEPORT CAMPER & TRUCK Accounts Payable Cleared AP Automation -129.41 03/23/2026 03/31/2026 APA009293 MANAGEMENT CONNECTIONS Accounts Payable Cleared AP Automation -2,760.00 03/23/2026 03/31/2026 APA009294 MEDIACOM Accounts Payable Cleared AP Automation -317.13 03/23/2026 03/31/2026 APA009295 MENDO MILL & LUMBER CO. Accounts Payable Cleared AP Automation -1,368.31 03/23/2026 03/31/2026 APA009296 MIKSIS SERVICES, INC. Accounts Payable Cleared AP Automation -26,360.00 03/23/2026 03/31/2026 APA009297 NAPA AUTO - LAKE PARTS Accounts Payable Cleared AP Automation -1,747.00 03/23/2026 03/31/2026 APA009298 PACE ENGINEERING, INC. Accounts Payable Cleared AP Automation -294.00 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 12 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
03/23/2026 03/31/2026 APA009299 PARRA ENVIRONMENTAL TRAINING Accounts Payable Cleared AP Automation -3,000.00 03/23/2026 03/31/2026 APA009300 PERKINS SEPTIC TANK CLEANING Accounts Payable Cleared AP Automation -1,428.76 03/23/2026 03/31/2026 APA009301 PG&E Accounts Payable Cleared AP Automation -36,111.10 03/23/2026 03/31/2026 APA009302 PITNEY BOWES BANK INC PURCHASE POWER Accounts Payable Cleared AP Automation -507.25 03/23/2026 03/31/2026 APA009303 POLESTAR COMPUTERS Accounts Payable Cleared AP Automation -6,986.43 03/23/2026 03/31/2026 APA009304 RAINBOW AGRICULTURAL SERVICES Accounts Payable Cleared AP Automation -144.78 03/23/2026 03/31/2026 APA009305 SONOMA RSA, INC Accounts Payable Cleared AP Automation -3,340.00 03/23/2026 03/31/2026 APA009306 THATCHER COMPANY OF CA., INC. Accounts Payable Cleared AP Automation -9,132.16 03/23/2026 03/31/2026 APA009307 TRUIST GOVERNMENTAL FINANCE Accounts Payable Cleared AP Automation -13,872.60 03/23/2026 03/31/2026 APA009308 U.S. BANK CORPORATE PAYMENT SYSTEMS Accounts Payable Cleared AP Automation -10,343.86 03/23/2026 03/31/2026 APA009309 USA BLUE BOOK Accounts Payable Cleared AP Automation -533.39 03/23/2026 03/31/2026 APA009310 VERIZON WIRELESS Accounts Payable Cleared AP Automation -2,057.20 03/23/2026 03/31/2026 APA009311 VESTIS Accounts Payable Cleared AP Automation -41.69 03/31/2026 61122 IBCCES Accounts Payable Outstanding Check -100.00 03/31/2026 61123 MARIE SCHRADER Accounts Payable Outstanding Check -2,933.58 03/31/2026 61124 NATHAN MAXMAN Accounts Payable Outstanding Check -247.19 03/31/2026 61125 WINE COUNTRY POWER, INC. Accounts Payable Outstanding Check -2,641.80 03/31/2026 DFT0004223 CALPERS Accounts Payable Outstanding Bank Draft -176.87 03/31/2026 DFT0004224 CALPERS Accounts Payable Outstanding Bank Draft -181.66 03/31/2026 DFT0004225 CALPERS Accounts Payable Outstanding Bank Draft -0.93 03/31/2026 DFT0004226 IRS Accounts Payable Outstanding Bank Draft -68.96 03/31/2026 DFT0004227 CA EMP DEVELOPMENT DEPT Accounts Payable Outstanding Bank Draft -62.32 03/31/2026 DFT0004228 CA EMP DEVELOPMENT DEPT Accounts Payable Outstanding Bank Draft -30.89 03/31/2026 DFT0004229 IRS Accounts Payable Outstanding Bank Draft -180.27 04/01/2026 APA009312 ADAMS ASHBY GROUP, LLC. Accounts Payable Outstanding AP Automation -7,411.50 04/01/2026 APA009313 ADVANCED SECURITY SYSTEMS Accounts Payable Outstanding AP Automation -691.50 04/01/2026 APA009314 ALPHA ANALYTICAL LABORATORIES Accounts Payable Outstanding AP Automation -341.00 04/01/2026 APA009315 AmWINS GROUP BENEFITS, INC. Accounts Payable Outstanding AP Automation -24,328.48 04/01/2026 APA009316 AT&T CALNET3 Accounts Payable Outstanding AP Automation -385.71 04/01/2026 APA009317 AT&T CALNET3 Accounts Payable Outstanding AP Automation -144.25 04/01/2026 APA009318 AT&T CALNET3 Accounts Payable Outstanding AP Automation -218.44 04/01/2026 APA009319 AT&T CALNET3 Accounts Payable Outstanding AP Automation -83.97 04/01/2026 APA009320 AT&T MOBILITY Accounts Payable Outstanding AP Automation -40.74 04/01/2026 APA009321 BAIER HEATING AND AIR Accounts Payable Outstanding AP Automation -1,020.00 04/01/2026 APA009322 CALIF INTERGOVERNMENTAL RISK AUTHORITY Accounts Payable Outstanding AP Automation -16,576.30 04/01/2026 APA009323 COLANTUONO, HIGHSMITH & WHATLEY, PC Accounts Payable Outstanding AP Automation -16,391.10 04/01/2026 APA009324 DAVIS TIRE & AUTO REPAIR Accounts Payable Outstanding AP Automation -80.00 04/01/2026 APA009325 FED EX Accounts Payable Outstanding AP Automation -18.19 04/01/2026 APA009326 INSURANCE AND BENEFITS TRUST OF PORAC Accounts Payable Outstanding AP Automation -340.00 04/01/2026 APA009327 IRONEDGE GROUP Accounts Payable Outstanding AP Automation -426.45 04/01/2026 APA009328 IT'S ABOUT TIME, INC Accounts Payable Outstanding AP Automation -5.00 04/01/2026 APA009329 JAMES DAY CONSTRUCTION, INC. Accounts Payable Outstanding AP Automation -175.00 04/01/2026 APA009330 LAKE COUNTY ELECTRIC SUPPLY Accounts Payable Outstanding AP Automation -136.33 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 13 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
04/01/2026 APA009331 LAKE COUNTY RECORD BEE Accounts Payable Outstanding AP Automation -2,526.38 04/01/2026 APA009332 MANAGEMENT CONNECTIONS Accounts Payable Outstanding AP Automation -2,760.00 04/01/2026 APA009333 MENDO MILL & LUMBER CO. Accounts Payable Outstanding AP Automation -738.26 04/01/2026 APA009334 NAPA AUTO - LAKE PARTS Accounts Payable Outstanding AP Automation -1,306.88 04/01/2026 APA009335 NOR-CAL TELECOM Accounts Payable Outstanding AP Automation -270.00 04/01/2026 APA009336 O'REILLY AUTO PARTS Accounts Payable Outstanding AP Automation -14.12 04/01/2026 APA009337 PACE ENGINEERING, INC. Accounts Payable Outstanding AP Automation -19,373.00 04/01/2026 APA009338 PACE SUPPLY #03391-00 Accounts Payable Outstanding AP Automation -2,725.52 04/01/2026 APA009339 PG&E Accounts Payable Outstanding AP Automation -10.72 04/01/2026 APA009340 PG&E Accounts Payable Outstanding AP Automation -2,627.58 04/01/2026 APA009341 PG&E Accounts Payable Outstanding AP Automation -60.30 04/01/2026 APA009342 PG&E Accounts Payable Outstanding AP Automation -268.71 04/01/2026 APA009343 PRECISION WIRELESS SERVICE Accounts Payable Outstanding AP Automation -262.50 04/01/2026 APA009344 R.S. HUGHES Accounts Payable Outstanding AP Automation -447.79 04/01/2026 APA009345 RAINBOW AGRICULTURAL SERVICES Accounts Payable Outstanding AP Automation -48.25 04/01/2026 APA009346 RB PEST CONTROL Accounts Payable Outstanding AP Automation -75.00 04/01/2026 APA009347 REGAL CHLORINATORS Accounts Payable Outstanding AP Automation -3,099.63 04/01/2026 APA009348 REMIF Accounts Payable Outstanding AP Automation -105,052.96 04/01/2026 APA009349 REMIF Accounts Payable Outstanding AP Automation -173.85 04/01/2026 APA009350 RICOH - WELLS FARGO VENDOR FIN SVCS, LLC Accounts Payable Outstanding AP Automation -746.16 04/01/2026 APA009351 RICOH USA, INC. Accounts Payable Outstanding AP Automation -142.77 04/01/2026 APA009352 SANTA ROSA JUNIOR COLLEGE Accounts Payable Outstanding AP Automation -67.50 04/01/2026 APA009353 SHN CONSULTING ENGINEERS & GEO Accounts Payable Outstanding AP Automation -861.25 04/01/2026 APA009354 STAPLES BUSINESS ADVANTAGE Accounts Payable Outstanding AP Automation -684.86 04/01/2026 APA009355 THATCHER COMPANY OF CA., INC. Accounts Payable Outstanding AP Automation -7,144.17 04/01/2026 APA009356 THE STANDARD INSURANCE COMPANY Accounts Payable Outstanding AP Automation -1,319.59 04/01/2026 APA009357 TRAINING FORCE USA, LLC Accounts Payable Outstanding AP Automation -227.00 04/01/2026 APA009358 TUFTS POLYGRAPH & INVESTIGATIONS Accounts Payable Outstanding AP Automation -400.00 04/01/2026 APA009359 USA BLUE BOOK Accounts Payable Outstanding AP Automation -416.39 04/01/2026 APA009360 VERIZON WIRELESS Accounts Payable Outstanding AP Automation -2,985.82 04/01/2026 APA009361 VESTIS Accounts Payable Outstanding AP Automation -42.94 04/01/2026 APA009362 WESTGATE PETROLEUM CO., INC. Accounts Payable Outstanding AP Automation -1,446.32 04/01/2026 APA009363 WILDA SHOCK Accounts Payable Outstanding AP Automation -1,500.00 04/01/2026 APA009364 WILLDAN FINANCIAL SERVICES Accounts Payable Outstanding AP Automation -2,037.53 04/03/2026 61113 AFLAC Accounts Payable Outstanding Check -580.98 04/03/2026 61114 CA STATE DISBURSEMENT UNIT Accounts Payable Outstanding Check -318.46 04/03/2026 61115 FRANCHISE TAX BOARD Accounts Payable Outstanding Check -120.00 04/03/2026 61116 FRANCHISE TAX BOARD Accounts Payable Outstanding Check -225.23 04/03/2026 61117 LAKEPORT EMPLOYEE'S ASSOC Accounts Payable Outstanding Check -345.00 04/03/2026 61118 LPOA Accounts Payable Outstanding Check -560.00 04/03/2026 61119 NATIONWIDE RETIREMENT SOLUTION Accounts Payable Outstanding Check -1,425.00 04/03/2026 61120 VALIC - C/O JP MORGAN CHASE Accounts Payable Outstanding Check -2,363.92 04/03/2026 61121 VEHICLE REGISTRATION COLLECTIONS Accounts Payable Outstanding Check -211.00 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 14 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
04/03/2026 DFT0004230 CALPERS Accounts Payable Outstanding Bank Draft -4,064.60 04/03/2026 DFT0004231 CALPERS Accounts Payable Outstanding Bank Draft -4,135.55 04/03/2026 DFT0004232 CALPERS Accounts Payable Outstanding Bank Draft -5,727.04 04/03/2026 DFT0004233 CALPERS Accounts Payable Outstanding Bank Draft -5,882.23 04/03/2026 DFT0004234 CALPERS Accounts Payable Outstanding Bank Draft -3,846.63 04/03/2026 DFT0004235 CALPERS Accounts Payable Outstanding Bank Draft -6,818.14 04/03/2026 DFT0004236 CALPERS Accounts Payable Outstanding Bank Draft -540.38 04/03/2026 DFT0004237 CALPERS Accounts Payable Outstanding Bank Draft -1,465.03 04/03/2026 DFT0004238 CALPERS Accounts Payable Outstanding Bank Draft -47.43 04/03/2026 DFT0004239 IRS Accounts Payable Outstanding Bank Draft -4,565.54 04/03/2026 DFT0004240 CA EMP DEVELOPMENT DEPT Accounts Payable Outstanding Bank Draft -5,156.57 04/03/2026 DFT0004241 CA EMP DEVELOPMENT DEPT Accounts Payable Outstanding Bank Draft -2,044.03 04/03/2026 DFT0004242 IRS Accounts Payable Outstanding Bank Draft -13,323.96 04/03/2026 DFT0004243 IRS Accounts Payable Outstanding Bank Draft -260.40 04/06/2026 REFAPA009024 IBCCES Accounts Payable Outstanding Bank Draft Reversal 50.00 04/06/2026 REFAPA009024 IBCCES Accounts Payable Outstanding Bank Draft Reversal 50.00 04/06/2026 REFAPA009253 GOT POWER, INC Accounts Payable Outstanding Bank Draft Reversal 2,415.15 04/06/2026 REFAPA009253 GOT POWER, INC Reversal Accounts Payable Outstanding Bank Draft Reversal 2,415.15 04/06/2026 REFAPA009253 GOT POWER, INC Accounts Payable Outstanding Bank Draft -2,415.15 04/06/2026 REFAPA009282 WINE COUNTRY POWER, INC. Accounts Payable Outstanding Bank Draft -2,641.80 04/06/2026 REFAPA009282 WINE COUNTRY POWER, INC. Reversal Accounts Payable Outstanding Bank Draft Reversal 2,641.80 04/06/2026 REFAPA009282 WINE COUNTRY POWER, INC. Accounts Payable Outstanding Bank Draft Reversal 2,641.80 04/08/2026 APA009365 ALPHA ANALYTICAL LABORATORIES Accounts Payable Outstanding AP Automation -196.00 04/08/2026 APA009366 AMAZON CAPITAL SERVICES, INC. Accounts Payable Outstanding AP Automation -433.88 04/08/2026 APA009367 AT&T CALNET3 Accounts Payable Outstanding AP Automation -293.77 04/08/2026 APA009368 BADGER METER Accounts Payable Outstanding AP Automation -1,200.00 04/08/2026 APA009369 DEPT OF JUSTICE Accounts Payable Outstanding AP Automation -70.00 04/08/2026 APA009370 ENTERPRISE - EAN SERVICES, LLC Accounts Payable Outstanding AP Automation -209.07 04/08/2026 APA009371 EUREKA OXYGEN COMPANY Accounts Payable Outstanding AP Automation -429.06 04/08/2026 APA009372 FED EX Accounts Payable Outstanding AP Automation -14.12 04/08/2026 APA009373 FERRELLGAS Accounts Payable Outstanding AP Automation -357.52 04/08/2026 APA009374 GRAINGER Accounts Payable Outstanding AP Automation -63.47 04/08/2026 APA009375 IRONEDGE GROUP Accounts Payable Outstanding AP Automation -189.00 04/08/2026 APA009376 IT'S ABOUT TIME, INC Accounts Payable Outstanding AP Automation -1,250.63 04/08/2026 APA009377 KELSEYVILLE LUMBER Accounts Payable Outstanding AP Automation -169.56 04/08/2026 APA009378 L. N. CURTIS & SONS Accounts Payable Outstanding AP Automation -20.54 04/08/2026 APA009379 LAKE COUNTY RECORD BEE Accounts Payable Outstanding AP Automation -343.94 04/08/2026 APA009380 LAKEPORT FENWAY AVENUE LP Accounts Payable Outstanding AP Automation -1,375,842.10 04/08/2026 APA009381 LC ACTION POLICE SUPPLY, LTD. Accounts Payable Outstanding AP Automation -2,087.50 04/08/2026 APA009382 MENDO MILL & LUMBER CO. Accounts Payable Outstanding AP Automation -198.14 04/08/2026 APA009383 MOTOROLA SOLUTIONS, INC. Accounts Payable Outstanding AP Automation -39.15 04/08/2026 APA009384 NAPA AUTO - LAKE PARTS Accounts Payable Outstanding AP Automation -384.35 04/08/2026 APA009385 NUSO Accounts Payable Outstanding AP Automation -279.27 Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 15 of 16
Cleared
Date Number Description Module Status Type Amount
Issued
Date
04/08/2026 APA009386 PAPE MACHINERY Accounts Payable Outstanding AP Automation -75.09 04/08/2026 APA009387 PEOPLE SERVICES, INC. Accounts Payable Outstanding AP Automation -400.00 04/08/2026 APA009388 PG&E Accounts Payable Outstanding AP Automation -23.82 04/08/2026 APA009389 PG&E Accounts Payable Outstanding AP Automation -391.00 04/08/2026 APA009390 PG&E Accounts Payable Outstanding AP Automation -180.97 04/08/2026 APA009391 PG&E Accounts Payable Outstanding AP Automation -1,042.90 04/08/2026 APA009392 PG&E Accounts Payable Outstanding AP Automation -38,062.57 04/08/2026 APA009393 PG&E Accounts Payable Outstanding AP Automation -32.67 04/08/2026 APA009394 PG&E Accounts Payable Outstanding AP Automation -1,734.67 04/08/2026 APA009395 PLAZA PAINT & SUPPLIES Accounts Payable Outstanding AP Automation -101.11 04/08/2026 APA009396 PYRO SPECTACULARS NORTH, INC. Accounts Payable Outstanding AP Automation -25,000.00 04/08/2026 APA009397 RB PEST CONTROL Accounts Payable Outstanding AP Automation -165.00 04/08/2026 APA009398 RICOH - WELLS FARGO VENDOR FIN SVCS, LLC Accounts Payable Outstanding AP Automation -491.23 04/08/2026 APA009399 RICOH USA, INC. Accounts Payable Outstanding AP Automation -13.37 04/08/2026 APA009400 TRI-CITIES ANSWERING SERVICE Accounts Payable Outstanding AP Automation -107.88 04/08/2026 APA009401 TUFTS POLYGRAPH & INVESTIGATIONS Accounts Payable Outstanding AP Automation -400.00 04/08/2026 APA009402 UNIVAR USA INC. Accounts Payable Outstanding AP Automation -6,093.30 04/08/2026 APA009403 VALLEY INTERNET Accounts Payable Outstanding AP Automation -99.00 04/08/2026 APA009404 VERIZON WIRELESS Accounts Payable Outstanding AP Automation -1,585.78 04/08/2026 APA009405 VESTIS Accounts Payable Outstanding AP Automation -42.94 04/08/2026 APA009406 WALTER K. BARR, D.C. Accounts Payable Outstanding AP Automation -150.00 04/08/2026 APA009407 WESTGATE PETROLEUM CO., INC. Accounts Payable Outstanding AP Automation -2,225.68 04/08/2026 APA009408 WHITE CAP, L.P. Accounts Payable Outstanding AP Automation -161.43 04/08/2026 APA009409 ZUMAR INDUSTRIES, INC. Accounts Payable Outstanding AP Automation -4,460.21 Bank Account 15-0352000798 Total: (619) -5,354,876.95
Report Total: (619) -5,354,876.95
Bank Transaction Report Issued Date Range: -
4/9/2026 5:00:44 PM Page 16 of 16
Summary
Bank Account Count Amount
15-0352000798 POOLED CASH BANK 619 -5,354,876.95
Report Total: 619 -5,354,876.95
Cash Account Count Amount
998 998-0000-101000 POOLED CASH - WEST AMERICA 619 -5,354,876.95 Report Total: 619 -5,354,876.95
Transaction Type Count Amount
AP Automation 448 -4,730,812.05
Bank Draft 79 -308,460.92
Bank Draft Reversal 7 10,307.40
Check 84 -328,844.96
Check Reversal 1 2,933.58
Report Total: 619 -5,354,876.95
X 2026-018
Council Meeting: 04/21/2026

Outlook
Re: Application 2026-018 - Summer Concerts in the Park
From Dale Stoebe <[email protected]>
Date Fri 2026-04-03 9:13 AM
To Hilary Britton <[email protected]>; Amanda Frazell <[email protected]>; Johnnie Lindsey <[email protected]>; Lisa Davey-Bates <[email protected]>; Lori Price <[email protected]>; Pheakdey Preciado <[email protected]>; Ron Ladd <[email protected]>; Sheriff's Dept <[email protected]>; Victor Fernandez <[email protected]>; Bethany Moss <[email protected]>; Katie Carpenter <[email protected]>; Kelly Buendia <[email protected]>; [email protected] <[email protected]>; Patrick Reitz <[email protected]>; Jim Kennedy <[email protected]>; Linda Sobieraj <[email protected]>; Matt Hartzog <[email protected]>; Michelle Humphrey <[email protected]>; Ryan Cooley <[email protected]>; Ky Ramsey <[email protected]>
The police department has no issues, nor any input on these events.

Chief of Police
Lakeport Police Department
CONFIDENTIALITY NOTICE: This communication with its contents may contain confidential and/or legally privileged information. It is solely for the use of the intended recipient(s).

Unauthorized interception, review, use or disclosure is prohibited and may violate applicable laws including the Electronic Communications Privacy Act. If you are not the intended recipient, please contact the sender and destroy all copies of the communication.

From: Hilary Britton <[email protected]>
Sent: Thursday, April 2, 2026 3:26 PM
To: Amanda Frazell <[email protected]>; Johnnie Lindsey <[email protected]>; Lisa DaveyBates <[email protected]>; Lori Price <[email protected]>; Pheakdey Preciado <[email protected]>; Ron Ladd <[email protected]>; Sheriff's Dept <[email protected]>; Dale Stoebe <[email protected]>; Victor Fernandez <[email protected]>; Bethany Moss <[email protected]>; Katie Carpenter <[email protected]>; Kelly Buendia <[email protected]>; [email protected] <[email protected]>; Patrick Reitz <[email protected]>; Jim Kennedy <[email protected]>; Linda Sobieraj <[email protected]>; Matt Hartzog <[email protected]>; Michelle Humphrey <[email protected]>; Ryan Cooley <[email protected]>; Ky Ramsey <[email protected]> Subject: Application 2026-018 - Summer Concerts in the Park Good Afternoon,
Please find attached application 2026-018 for the 2026 Summer Concerts in the Park for your review and comments.

We would like to submit this for City Council approval at the 04/21/2026 Council meeting, so please have your comments back to me by 04/15/2026.

Thank you for your input!
Hilary Britton, CMC
Deputy City Clerk/Records Supervisor
City of Lakeport
225 Park Street
Lakeport, CA  95453
(707) 263-5615 x102
[email protected]
E-mail correspondence and attachments with the City of Lakeport may be subject to the California Public Records Act, and as such may therefore be subject to public disclosure unless otherwise exempt under the Act. *For Public Records Act requests, please visit our online public records request system Book time to meet with me
Outlook
FW: Application 2026-018 - Summer Concerts in the Park
From Lake County Sheriff - Records <[email protected]> Date Mon 2026-04-06 7:49 AM
To Hilary Britton <[email protected]>
From: Jose Martinez <[email protected]>
Sent: Sunday, April 5, 2026 2:01 PM
To: Lake County Sheriff - Records <[email protected]> Subject: RE: Application 2026-018 - Summer Concerts in the Park No questions or comments from the Sheriff’s Office.

From: Lake County Sheriff - Records <[email protected]> Sent: Thursday, April 2, 2026 3:58 PM
To: Jose Martinez <[email protected]>
Subject: FW: Application 2026-018 - Summer Concerts in the Park From: Hilary Britton <[email protected]>
Sent: Thursday, April 2, 2026 3:26 PM
To: Amanda Frazell <[email protected]>; Johnnie Lindsey <[email protected]>; Lisa DaveyBates <[email protected]>; Lori Price <[email protected]>; Pheakdey Preciado <[email protected]>; Ron Ladd <[email protected]>; Lake County Sheriff - Records <[email protected]>; Dale Stoebe <[email protected]>; Victor Fernandez <[email protected]>; Bethany Moss <[email protected]>; Katie Carpenter <[email protected]>; Kelly Buendia <[email protected]>; [email protected]; Patrick Reitz <[email protected]>; Jim Kennedy <[email protected]>; Linda Sobieraj <[email protected]>; Matt Hartzog <[email protected]>; Michelle Humphrey <[email protected]>; Ryan Cooley <[email protected]>; Ky Ramsey <[email protected]> Subject: [EXTERNAL] Application 2026-018 - Summer Concerts in the Park Good Afternoon,
Please find attached application 2026-018 for the 2026 Summer Concerts in the Park for your review and comments.

We would like to submit this for City Council approval at the 04/21/2026 Council meeting, so please have your comments back to me by 04/15/2026.

Thank you for your input!
Hilary Britton, CMC
Deputy City Clerk/Records Supervisor
City of Lakeport
225 Park Street
Lakeport, CA  95453
(707) 263-5615 x102
[email protected]
E-mail correspondence and attachments with the City of Lakeport may be subject to the California Public Records Act, and as such may therefore be subject to public disclosure unless otherwise exempt under the Act. *For Public Records Act requests, please visit our online public records request system Book time to meet with me

Outlook
Re: Application 2026-019 - Tuesday Farmers Market at Library Park From Dale Stoebe <[email protected]>
Date Wed 2026-04-08 3:05 PM
To Hilary Britton <[email protected]>; Amanda Frazell <[email protected]>; Johnnie Lindsey <[email protected]>; Lisa Davey-Bates <[email protected]>; Lori Price <[email protected]>; Pheakdey Preciado <[email protected]>; Ron Ladd <[email protected]>; Sheriff's Dept <[email protected]>; Victor Fernandez <[email protected]>; Bethany Moss <[email protected]>; Katie Carpenter <[email protected]>; Kelly Buendia <[email protected]>; [email protected] <[email protected]>; Patrick Reitz <[email protected]>; Jim Kennedy <[email protected]>; Linda Sobieraj <[email protected]>; Matt Hartzog <[email protected]>; Michelle Humphrey <[email protected]>; Ryan Cooley <[email protected]>; Ky Ramsey <[email protected]>
The police department has no issue nor input on this event.

Sincerely,
Chief of Police
Lakeport Police Department
CONFIDENTIALITY NOTICE: This communication with its contents may contain confidential and/or legally privileged information. It is solely for the use of the intended recipient(s).

Unauthorized interception, review, use or disclosure is prohibited and may violate applicable laws including the Electronic Communications Privacy Act. If you are not the intended recipient, please contact the sender and destroy all copies of the communication.

From: Hilary Britton <[email protected]>
Sent: Wednesday, April 8, 2026 2:47 PM
To: Amanda Frazell <[email protected]>; Johnnie Lindsey <[email protected]>; Lisa Davey-Bates <[email protected]>; Lori Price <[email protected]>; Pheakdey Preciado <[email protected]>; Ron Ladd <[email protected]>; Sheriff's Dept <[email protected]>; Dale Stoebe <[email protected]>; Victor Fernandez <[email protected]>; Bethany Moss <[email protected]>; Katie Carpenter <[email protected]>; Kelly Buendia <[email protected]>; [email protected] <[email protected]>; Patrick Reitz <[email protected]>; Jim Kennedy <[email protected]>; Linda Sobieraj <[email protected]>; Matt Hartzog <[email protected]>; Michelle Humphrey <[email protected]>; Ryan Cooley <[email protected]>; Ky Ramsey <[email protected]>
Subject: Application 2026-019 - Tuesday Farmers Market at Library Park Good Afternoon,
Please find attached application 2026-019 for the 2026 Farmers Market at Library Park for your review and comments.

We would like to submit this for City Council approval at the 04/21/2026 Council meeting, so please have your comments back to me by 04/16/2026.

Thank you for your input!
Hilary Britton, CMC
Deputy City Clerk/Records Supervisor
City of Lakeport
225 Park Street
Lakeport, CA  95453
(707) 263-5615 x102
[email protected]
E-mail correspondence and attachments with the City of Lakeport may be subject to the California Public Records Act, and as such may therefore be subject to public disclosure unless otherwise exempt under the Act. *For Public Records Act requests, please visit our online public records request system Book time to meet with me
Outlook
Fw: Application 2026-019 - Tuesday Farmers Market at Library Park From Lake County Sheriff - Records <[email protected]> Date Mon 2026-04-13 7:00 AM
To Hilary Britton <[email protected]>
From: Jose Martinez <[email protected]>
Sent: Sunday, April 12, 2026 9:02 AM
To: Lake County Sheriff - Records <[email protected]> Subject: RE: Application 2026-019 - Tuesday Farmers Market at Library Park No comments or questions from the sheriff’s office.

From: Lake County Sheriff - Records <[email protected]> Sent: Wednesday, April 8, 2026 2:50 PM
To: Jose Martinez <[email protected]>
Subject: Fw: Application 2026-019 - Tuesday Farmers Market at Library Park Records Unit
www.lakesheriff.com P: 707-262-4200
1220 Martin St F:707-262-4204
Lakeport, CA 95453 Dispatch: 707-263-2690
From: Hilary Britton <[email protected]>
Sent: Wednesday, April 8, 2026 2:47 PM
To: Amanda Frazell <[email protected]>; Johnnie Lindsey <[email protected]>; Lisa Davey-Bates <[email protected]>; Lori Price <[email protected]>; Pheakdey Preciado <[email protected]>; Ron Ladd <[email protected]>; Lake County Sheriff - Records <[email protected]>; Dale Stoebe <[email protected]>; Victor Fernandez <[email protected]>; Bethany Moss <[email protected]>; Katie Carpenter <[email protected]>; Kelly Buendia <[email protected]>; [email protected] <[email protected]>; Patrick Reitz <[email protected]>; Jim Kennedy <[email protected]>; Linda Sobieraj <[email protected]>; Matt Hartzog <[email protected]>; Michelle Humphrey <[email protected]>; Ryan Cooley <[email protected]>; Ky Ramsey <[email protected]>
Subject: [EXTERNAL] Application 2026-019 - Tuesday Farmers Market at Library Park Good Afternoon,
Please find attached application 2026-019 for the 2026 Farmers Market at Library Park for your review and comments.

We would like to submit this for City Council approval at the 04/21/2026 Council meeting, so please have your comments back to me by 04/16/2026.

Thank you for your input!
Hilary Britton, CMC
Deputy City Clerk/Records Supervisor
City of Lakeport
225 Park Street
Lakeport, CA  95453
(707) 263-5615 x102
[email protected]
E-mail correspondence and attachments with the City of Lakeport may be subject to the California Public Records Act, and as such may therefore be subject to public disclosure unless otherwise exempt under the Act. *For Public Records Act requests, please visit our online public records request system Book time to meet with me
Meeting Date: 04/21/2026 Page 1 Agenda Item # IV.F.
407103.1

CITY OF LAKEPORT
City Council
City of Lakeport Municipal Sewer District
Lakeport Redevelopment Successor Agency
Lakeport Industrial Development Authority
Municipal Financing Agency of Lakeport

STAFF REPORT
RE: Resolution of the Board of Directors of the City of Lakeport Municipal Sewer District (CLMSD) adopting the Sewer System Management Plan (SSMP) update, and authorizing CIWQS certification MEETING DATE: 04/21/2026
SUBMITTED BY: Jen Baker, Compliance Officer on behalf of Paul Harris, Utilities Director PURPOSE OF REPORT: Information only Discussion Action Item WHAT IS BEING ASKED OF THE CITY COUNCIL/BOARD:

Adopt a resolution approving the City of Lakeport Municipal Sewer District (CLMSD) Sewer System Management Plan (SSMP) update, and authorize the Compliance Officer to certify the document in the California Integrated Water Quality System (CIWQS) on behalf of the CLMSD Director.

BACKGROUND/DISCUSSION:

The State Water Resources Control Board requires all California public agencies operating sanitary sewer systems to prepare and maintain a Sewer System Management Plan, a program document describing how the agency manages, operates, and maintains its wastewater collection system to protect public health, prevent sewer overflows, and ensure long-term system reliability. CLMSD has maintained an SSMP since 2010. Under the current governing order (Order WQ 2022-0103-DWQ), CLMSD is required to certify an updated SSMP in CIWQS by May 2, 2026.

Staff used this required update cycle as an opportunity to comprehensively review and strengthen each program area, formalize existing practices, establish clear performance frameworks, and align the document with the current governing order and the District's adopted 2025 Sewer Master Plan Update. This SSMP update reflects a more mature and complete picture of how the District operates and provides a stronger foundation for ongoing compliance, system management, and regulatory reporting.

The updated SSMP establishes a formal performance monitoring program with measurable targets and a regular review cadence; modernizes the District's Fats, Oils, and Grease control program with updated inspection authority and outreach materials; strengthens overflow emergency response documentation; and fully integrates the adopted 2025 Sewer Master Plan Update as the District's current capacity and capital improvement planning foundation. The SSMP is structured as a living document with built-in tracking and change management processes to carry the program forward.

Board adoption of the resolution presented with this report is the final step required prior to CIWQS certification of the updated plan by the May 2, 2026, deadline.

Meeting Date: 04/21/2026 Page 2 Agenda Item # IV.F.
407103.1
OPTIONS:

1. Adopt the resolution as presented, approving the CLMSD Sewer System Management Plan (SSMP) update, and authorizing the Compliance Officer to certify the document in CIWQS.

2. Adopt the resolution with modifications and provide direction to staff.

3. Take no action. (Note: CIWQS certification deadline is May 2, 2026. Delays beyond this date may constitute a regulatory violation under Order WQ 2022-0103-DWQ.)
FISCAL IMPACT:

None $ Budgeted Item? Yes No
Budget Adjustment Needed? Yes No If yes, amount of appropriation increase:

Affected fund(s): General Fund Water OM Fund Sewer OM Fund Other: Special Revenue/Grant Comments:

COUNCIL PRIORITIES:
☐ Priority #1: Public Safety & Crisis Response
☐ Priority #2: Disaster Resiliency
☒ Priority #3: Good Governance & Fiscal Stability
☒ Priority #4: Capital Infrastructure Improvement
☒ Priority #5: Safe, Sustainable & Attractive Neighborhoods ☐ Priority #6: Economic Development
SUGGESTED MOTIONS:

Move to adopt a resolution approving and certifying the City of Lakeport Municipal Sewer District Sewer System Management Plan (SSMP) update, prepared in compliance with State Water Resources Control Board Order WQ 2022-0103-DWQ, and authorizing the Compliance Officer to certify the document in the California Integrated Water Quality System (CIWQS) on behalf of the CLMSD Director.

Attachments: 1. Resolution – Adopt SSMP update and authorize CIWQS certification

2. Sewer System Management Plan (SSMP) update
RESOLUTION NO. _____ (2026)

RESOLUTION OF THE BOARD OF DIRECTORS OF THE CITY OF LAKEPORT MUNICIPAL

SEWER DISTRICT (CLMSD) ADOPTING THE SEWER SYSTEM MANAGEMENT PLAN (SSMP) UPDATE, AND AUTHORIZING CIWQS CERTIFICATION
WHEREAS, on May 2, 2006, the State Water Resources Control Board (SWRCB) adopted Order No. WQ 2006-0003-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems; and
WHEREAS, on September 9, 2013, the SWRCB adopted Order No. WQ 2013-0058-EXEC, amending the Monitoring and Reporting Program to improve the consistency and quality of sanitary sewer overflow (SSO) data reporting; and
WHEREAS, on December 6, 2022, the SWRCB adopted Order No. WQ 2022-0103-DWQ, which superseded the previous orders and established modernized requirements for the operation, maintenance, and management of sanitary sewer systems; and WHEREAS, the purpose of these Orders is to provide a consistent statewide regulatory approach for reducing sanitary sewer overflows and protecting the water quality of regional water bodies, including Clear Lake; and
WHEREAS, Order No. WQ 2022-0103-DWQ requires each enrolled wastewater collection system agency to develop, implement, and periodically update a Sewer System Management Plan (SSMP) addressing eleven required elements, and to certify the SSMP in the State Water Resources Control Board’s California Integrated Water Quality System (CIWQS); and WHEREAS, the City of Lakeport Municipal Sewer District (CLMSD) first adopted an SSMP in 2010 and is required to certify an updated SSMP in CIWQS by May 2, 2026, consistent with the requirements of Order No. WQ 2022-0103-DWQ; and
WHEREAS, the District has prepared the SSMP update to comply with Order No. WQ 2022-0103- DWQ reflects current operational practices and program frameworks, and incorporates improvements identified through the District’s ongoing program review; and WHEREAS, Order No. WQ 2022-0103-DWQ requires the District to identify an authorized representative to certify the SSMP and SSO reports in CIWQS on behalf of the District.

NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the City of Lakeport Municipal Sewer District hereby adopts the City of Lakeport Municipal Sewer District Sewer System Management Plan update (WDID No. 5SSO10896), dated April 21, 2026.

BE IT FURTHER RESOLVED that the Board of Directors hereby authorizes Jen Baker, Compliance Officer, to certify the SSMP and all subsequent updates, SSO reports, and other required submittals in CIWQS on behalf of the District, consistent with the requirements of Order No. WQ 2022-0103-DWQ.

BE IT FURTHER RESOLVED BE IT FURTHER RESOLVED that the Board of Directors hereby finds that adoption of the Sewer System Management Plan (SSMP) update, is exempt from the California Environmental Quality Act pursuant to CEQA Guidelines sections 15378(b)(2) and (b)(5) (governmental administrative and policymaking activities which do not involve any commitment to any specific project which may result in a potentially significant physical impact on the environment), 15307 (actions by regulatory agencies for protection of natural resources), 15308 (actions by regulatory agencies for protection of the environment), and 15061(b)(3) (common sense exemption where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment).

PASSED AND ADOPTED by the Board of Directors of the City of Lakeport Municipal Sewer District at a regular meeting thereof held on the _____ day of __________________, 2026.

AYES: ____
NOES: ____
ABSENT: ____
ABSTAINING:____
________________________________________
Brandon Disney, Mayor / Chairman
ATTEST:
________________________________________
Kelly Buendia, City Clerk
APRIL 13
WDID # 5SSO10896
Prepared by: Jen Baker, Compliance Officer
Approved by: Paul Harris, Utilities Director
City of Lakeport
Sewer System Management Plan
(SSMP) Update
May 2, 2026
Table of Contents
Acronym Table............................................................................................................................................... 3 Key Terms & Definitions ................................................................................................................................ 5 Introduction .................................................................................................................................................... 8 Purpose .......................................................................................................................................................11 SSMP Element-by-Element
Element I – Goals..................................................................................................................................14 Element II – Organization......................................................................................................................18 Element III – Legal Authority.................................................................................................................21 Element IV – Operations and Maintenance ..........................................................................................24 Element V – Design and Performance Provisions ................................................................................29 Element VI – Overflow Emergency Response Plan .............................................................................32 Element VII – Sewer Pipe Blockage Control Program..........................................................................36 Element VIII – System Evaluation and Capacity Assurance Plan ........................................................41 Element IX – Monitoring, Measurement, and Program Modifications...................................................44 Element X – Program Audits.................................................................................................................47 Element XI – Communication Program................................................................................................. 49 Appendices
Appendix Table of Contents..................................................................................................................51 Appendix 2A – Organizational Chart & Contact List .............................................................................53 Appendix 2B – SSO Regulatory Reporting Requirements Reference..................................................55 Appendix 3A – Lakeport Municipal Code Chapter 13.20 – Sewer Use & Pretreatment.......................57 Appendix 3B – Resolution No. 2315 (2008) – FOG Program Fines & Penalties..................................58 Appendix 3C – Utilities Department Policies U-3, U-4, U-6 ..................................................................59 Appendix 3D – Mutual Aid Agreement with LACOSAN ........................................................................71 Appendix 4A – Collection System Map................................................................................................. 72 Appendix 4B – 2025 Sewer Master Plan Update .................................................................................74 Appendix 5 – Adopted Sewer System Design & Construction Standards............................................75 Appendix 6A – SSO Field Report Form & CIWQS Spill Narrative Template........................................76 Appendix 6B – Hazardous Materials Incident Response Plan .............................................................80 Appendix 6C – Overflow Emergency Response Plan (OERP)...........................................................152 Appendix 7A – Grease Trap / Interceptor Inspection Policy ...............................................................257 Appendix 7B – SSO / FOG Incident Maps..........................................................................................267 Appendix 10A – SSMP Audit Template ..............................................................................................270 Appendix 10B – 2022–2025 SSMP Audit Report (October 2025)......................................................296 Appendix 10C – Element Status Summary (CAP Log).......................................................................336 Appendix 10D – SSMP Change Log...................................................................................................345 Acronym Table
Acronym Definition
ADWF Average Dry Weather Flow
BMP Best Management Practice
CalOES California Governor's Office of Emergency Services CAP Corrective Action Plan
CCR California Code of Regulations
CCTV Closed-Circuit Television
CDBG Community Development Block Grant
CIP Capital Improvement Plan
CIPP Cured-in-Place Pipe
CIWQS California Integrated Water Quality System
CLMSD City of Lakeport Municipal Sewer District
CWEA California Water Environment Association
CWSRF Clean Water State Revolving Fund
DWQ Division of Water Quality (State Water Resources Control Board) EOP Emergency Operations Plan
FOG Fats, Oils, and Grease
FSE Food Service Establishment
GIS Geographic Information System
GPD Gallons Per Day
I&I Inflow and Infiltration
KPI Key Performance Indicator
LACOSAN Lake County Sanitation District
LF Linear Feet
LMC Lakeport Municipal Code
MACP Manhole Assessment Certification Program (NASSCO)
MGD Million Gallons Per Day
3 / 352
MOU Memorandum of Understanding
MTS Manual Transfer Switch
NASSCO National Association of Sewer Service Companies
NPDES National Pollutant Discharge Elimination System
O&M Operations and Maintenance
OERP Overflow Emergency Response Plan
PACE PACE Engineering (consulting firm — 2025 SMPU)
PACP Pipeline Assessment Certification Program (NASSCO) PM Preventive Maintenance
PPE Personal Protective Equipment
PWWF Peak Wet Weather Flow
RWQCB Regional Water Quality Control Board
SCADA Supervisory Control and Data Acquisition
SMP Sewer Master Plan
SMPU Sewer Master Plan Update
SOP Standard Operating Procedure
SSO Sanitary Sewer Overflow
SSMP Sewer System Management Plan
SWRCB State Water Resources Control Board
WDR Waste Discharge Requirements
WDID Waste Discharge Identification Number
WWTP Wastewater Treatment Plant
I
I
I
I
I
I
I
I
I
+
+
+
IL_ ____________ ~
I
I
I
I
I
I
I
I
I
4 / 352
List of Key Terms and Definitions
The following terms are used throughout this Sewer System Management Plan. Definitions reflect the requirements and terminology of State Water Resources Control Board Order WQ 2022-0103-DWQ unless otherwise noted.

Term Definition
Authorized
Representative
The person designated by a public agency as either a principal executive officer or duly authorized representative. For CLMSD, this is the CLMSD Director or the Compliance Officer, as designated.

Average Dry Weather
Flow (ADWF)
The average daily flow of wastewater to the treatment plant during dry weather conditions, excluding significant rainfall-driven inflow and infiltration. Used as a baseline capacity metric. This is determined by the total flow for the months of August through October, inclusive, divided by 92 days.

Blockage A partial or full obstruction of wastewater flow through a sewer pipeline.

Causes include debris, grease buildup, root intrusion, or structural collapse.

Also called a stoppage. If not addressed in time, a blockage can result in an overflow.

Capital Improvement Plan
(CIP)
A prioritized, scheduled, and funded program identifying infrastructure projects needed to maintain system capacity, reliability, and compliance. For CLMSD, the current CIP is established in the 2025 Sewer Master Plan Update.

Category 1 SSO A sanitary sewer overflow of any volume that reaches a surface water body or drainage channel leading to surface water, or that is not fully recovered.

Requires immediate notification to regulatory agencies.

Category 2 SSO A sanitary sewer overflow of 1,000 gallons or greater that does not reach surface water. Requires regulatory reporting through CIWQS.

Category 3 SSO A sanitary sewer overflow of 50 to 999 gallons that does not reach surface water. Requires regulatory reporting through CIWQS.

Category 4 SSO A sanitary sewer overflow of less than 50 gallons that does not reach surface water. Requires documentation but not external regulatory reporting.

Corrective Maintenance Unplanned maintenance performed in response to a failure, blockage, or system malfunction. Distinguished from preventive maintenance, which is scheduled and proactive.

Enrollee A public agency enrolled under State Water Resources Control Board Order WQ 2022-0103-DWQ that owns or operates a sanitary sewer collection system greater than one mile in length.

Exfiltration The underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure. Exfiltration that remains in the subsurface and does not reach surface water is not classified as an SSO under the General Order.
5 / 352
Food Service
Establishment (FSE)
Any commercial establishment that prepares, serves, or otherwise handles food and discharges wastewater containing fats, oils, or grease to the municipal sanitary sewer system.

Grease Interceptor A plumbing device installed underground outside a food service establishment that uses gravity to separate and retain fats, oils, and grease from wastewater before it enters the sanitary sewer system.

Grease Trap A small, indoor plumbing device installed at an individual fixture that captures fats, oils, and grease before they enter the drain system. Typically used where a full grease interceptor is not required.

Inflow and Infiltration (I&I) Inflow refers to stormwater or surface water that enters the sanitary sewer system through direct connections such as roof drains or catch basins.

Infiltration refers to groundwater that enters through cracks, joints, or defects in pipes and manholes. Both increase system flows during wet weather and are a primary driver of peak wet weather flow at CLMSD.

Key Performance
Indicator (KPI)
A measurable target used to evaluate how well a program or process is achieving its intended outcomes. KPIs provide a basis for data-driven decisionmaking and continuous improvement.

Peak Wet Weather Flow
(PWWF)
The maximum rate of flow observed at the wastewater treatment plant during significant rainfall events, reflecting the combined effect of wastewater generation and I&I entering the collection system.

Preventive Maintenance
(PM)
Scheduled, proactive maintenance activities performed to reduce the likelihood of failure, blockage, or SSO. Includes gravity main cleaning, lift station inspections, and equipment servicing.

Private Lateral Sewage
Discharge (PLSD)
A sewage spill that originates from a blockage or failure within a privately owned sewer lateral, not the public collection system. PLSDs are reported separately from SSOs in CIWQS.

Receiving Water A water of the State that receives a discharge of waste. For CLMSD, the primary receiving water of concern is Clear Lake.

Resilience The ability of a sewer system and its operating agency to recover from or adjust to adversity or change, including infrastructure failures, extreme weather events, and regulatory changes.

Residential Unit
Equivalent (RUE)
A unit of measure representing the average wastewater flow generated by a single-family residential dwelling. Used to standardize capacity calculations across different land use types.

Sanitary Sewer Overflow
(SSO)
Any overflow, spill, release, discharge, or diversion of untreated or partially treated wastewater from a sanitary sewer system, including overflows that reach waters of the United States, overflows that do not reach such waters, and backups into buildings caused by conditions within the publicly owned portion of the sewer system.

Sanitary Sewer System A system of pipes, pump stations, sewer lines, or other conveyances upstream of a wastewater treatment plant headworks, used to collect and convey wastewater to a publicly owned treatment facility. Includes laterals owned and 6 / 352
operated by the Enrollee, satellite sewer systems, and temporary conveyance facilities.

Satellite Sewer System A portion of a sanitary sewer system owned or operated by a different entity than the owner of the downstream wastewater treatment facility. LACOSAN operates a satellite system that connects to CLMSD at the southern portion of the service area. These flows enter our collection system and conveyed to the WWTP for treatment.

Sewage Untreated or partially treated domestic, municipal, commercial, and/or industrial waste, including sewage sludge, and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Sewer System
Management Plan (SSMP)
A living document an Enrollee develops and implements to effectively manage its sanitary sewer system in accordance with Order WQ 2022-0103-DWQ.

Includes provisions for management, operation, and maintenance of the system, risk management, and a spill response plan.

System Evaluation and
Capacity Assurance Plan
A required SSMP element that evaluates hydraulic deficiencies in the collection system, establishes design criteria, and provides a prioritized Capital Improvement Plan to maintain hydraulic capacity for dry weather and wet weather flow conditions.

Wastewater Collection
System
See Sanitary Sewer System. Any system of pipes, pump stations, sewer lines, or other conveyances used to collect and convey wastewater to a publicly owned treatment facility.
7 / 352
Introduction
This introductory section provides background on the regulatory basis for this Sewer System Management Plan (SSMP), describes the organization of the document, and provides an overview of the City of Lakeport Municipal Sewer District's service area and collection system.

Revision History
This document is Revision 5 of the City of Lakeport Municipal Sewer District (CLMSD) Sewer System Management Plan.

The table below summarizes the history of SSMP revisions.

Table 0.1 — SSMP Revision History
Revision Date Description
1 May 2010 Original SSMP adoption. Baseline document prepared by City of Lakeport Utilities Department.
2 March 2018 Updates include modifications to the district's SSO emergency response plan, monitoring and reporting program, and contact info updates 3 December 2022 Minor administrative update. Contact information and appendix materials revised.
4 May 2024 Administrative update. Contact list updated. No substantive program changes.
5 April 2026 Comprehensive update. Revised to comply with SWRCB Order WQ 2022- 0103-DWQ. Incorporates findings and corrective actions from the 2022– 2025 Triennial SSMP Audit. Integrates adopted 2025 Sewer Master Plan Update. New sections added for performance monitoring, FOG program modernization, post-incident review, and operator participation documentation.

Sewer System Management Plan Requirement Background
The State Water Resources Control Board (SWRCB) adopted Water Quality Order No. 2006-0003-DWQ on May 2, 2006, which first required all public agencies in California operating sanitary sewer systems greater than one mile in length to prepare and implement a Sewer System Management Plan and to report sanitary sewer overflows (SSOs) through the California Integrated Water Quality System (CIWQS).

In 2013, the SWRCB issued Order No. WQ 2013-0058-EXEC, amending the 2006 Order to establish a third SSO reporting category (Category 3 — spills fully contained within the collection system) and to clarify recordkeeping and reporting requirements for enrolled agencies.

In 2022, the SWRCB adopted Order WQ 2022-0103-DWQ, a comprehensive update to the Statewide General Waste Discharge Requirements that supersedes both the 2006 Order and the 2013 amendment. Order WQ 2022-0103-DWQ 8 / 352
governs all enrolled agencies, including CLMSD. This Revision 5 SSMP has been prepared to comply with its requirements, including updated SSO reporting protocols, triennial audit requirements, and performance monitoring expectations.

An SSMP describes the activities an agency undertakes to manage its wastewater collection system effectively. At a minimum, it addresses the following:

1. Maintaining or improving the condition of the collection system infrastructure to provide reliable service;

2. Cost-effectively minimizing inflow and infiltration (I&I) and providing adequate capacity to accommodate peak flow conditions; and

3. Minimizing the frequency and impact of sanitary sewer overflows.

This SSMP has been prepared to meet the requirements of both the SWRCB Order WQ 2022-0103-DWQ and the North Coast Regional Water Quality Control Board (RWQCB). It incorporates findings and corrective actions from the 2022–2025 Triennial SSMP Audit completed in October 2025 and integrates the 2025 Sewer Master Plan Update (PACE Engineering), adopted by the Board of Directors in February 2026.

Document Organization
This SSMP is organized into eleven elements as required by Order WQ 2022-0103-DWQ. Each element is presented as an integrated narrative section that describes program requirements, documents current practices, and identifies applicable supporting materials and appendices. The eleven elements are:

1. Goals

2. Organization

3. Legal Authority

4. Operations and Maintenance Program

5. Design and Performance Provisions

6. Overflow Emergency Response Plan

7. Fats, Oils, and Grease Control Program

8. System Evaluation and Capacity Assurance Plan

9. Monitoring, Measurement, and Program Modifications

10. Program Audits

11. Communication Program
Supporting materials, forms, maps, and reference documents are included as appendices. The SSMP is maintained as a living document and is updated following triennial audits or significant changes to system conditions, organizational structure, or regulatory requirements. All revisions are logged in the SSMP Change Log (Appendix 10.D). 9 / 352
District Service Area and Sewer System
The City of Lakeport Municipal Sewer District (CLMSD or District) provides wastewater collection service to the City of Lakeport and adjacent unincorporated areas to the south and west. The City operates under a council-manager form of municipal government. The District is governed by a Board of Directors whose members also serve as the City Council.

Lakeport is located on the western shore of Clear Lake in Lake County. It was incorporated in 1888 and encompasses approximately 2.7 square miles. The District serves approximately 2,200 connections and over 5,000 customers, representing roughly eight percent of Lake County's total population. Current land use in Lakeport is approximately 76 percent commercial and residential, five percent industrial, and 19 percent open space, governmental, and agricultural.

The District operates and maintains the sanitary sewer collection system up to each private property line, along with eight sewage lift stations and a secondary wastewater treatment and disposal facility. A summary of key system metrics, as documented in the 2025 Sewer Master Plan Update, is provided below:

System Component Metric Source
Gravity sewer mains 30.23 linear miles 2025 SMPU
Force mains (estimated) 2.4 linear miles Distance measured using the system map
and electronic map
measuring tools
Public sewer laterals 10 linear miles City Records
Service laterals 1,521 2025 SMPU
Manholes 568 2025 SMPU
Sewage lift stations 8 (all >75,000 GPD design
capacity)
2025 SMPU
Predominant pipe installation eras 1920–1939 and 1940–1959 (48% of system)
2025 SMPU
Pipe materials Vitrified clay, Orangeburg,
asbestos-cement, and PVC
2025 SMPU
WWTP design capacity (ADWF) 0.53 MGD 2025 SMPU
Current ADWF (2020–2024 average) 0.36 MGD (68% of capacity) 2025 SMPU The collection system includes pipes ranging from 4 to 24 inches in diameter, with a significant portion of the infrastructure nearly 80 to 100 years old. While the system generally performs adequately under normal conditions, portions of the collection system are subject to moderate to severe surcharging during peak wet weather events due to inflow and infiltration (I&I). Ongoing I&I mitigation and targeted rehabilitation, guided by the 2025 Sewer Master Plan Update, are central components of the District's long-term asset management strategy.

The District's collection system discharges to a secondary wastewater treatment and disposal facility operated by the City.

Wastewater treated at the facility is disposed of through land application at the City's effluent irrigation areas. The Lake County Sanitation District (LACOSAN) maintains a mutual aid agreement with CLMSD, allowing for inter-agency flow exchange in both the northern and southern portions of the service area. 10 / 352
Purpose of This SSMP
The purpose of this SSMP is to provide a structured, continuously improving framework for the management, operation, and maintenance of the City of Lakeport's sanitary sewer collection system. The SSMP is designed to minimize sanitary sewer overflows, protect public health and water quality in the Clear Lake watershed, maintain system reliability, and ensure that infrastructure capacity is adequate to serve existing and future customers.

This plan update reflects a significant program modernization effort. It incorporates the corrective actions identified in the 2022–2025 Triennial SSMP Audit, integrates the adopted 2025 Sewer Master Plan Update as the District's current capacity and capital improvement planning foundation, and enhances formal performance monitoring, documentation, and operator participation frameworks.

SSMP Work Plan and Schedule
The following table identifies each SSMP element, its status as of this revision, and the scheduled review frequency going forward. This table fulfills the Work Plan and Schedule requirement of Order WQ 2022-0103-DWQ and serves as the District's ongoing compliance tracking reference for the SSMP program.

Table 0.2 — SSMP Work Plan and Schedule | Revision 5 — April 2026 # Element Revision 5 Status Next Review
— Plan & Schedule Complete — Work Plan updated
April 2026; revision history
documented
Following each triennial audit
I Goals Complete — program goals
updated; KPI framework and risk
management section established;
annual review cadence adopted
Annual KPI review; triennial
audit
II Organization Complete — contacts verified; org
structure documented
Annually or upon staff change
III Legal Authority In Progress — SSMP narrative
updated; LMC Chapter 13.20
comprehensive revision pending
(timeline to be established upon
City Attorney engagement);
preliminary land use review has
identified candidate nondomestic
industrial user types in the service
area; formal nondomestic user
survey committed corrective
action; target Q4 2026; permitting
pathway for identified Class I–III
users to follow survey completion;
target Q2 2027
Upon ordinance adoption;
upon survey completion
IV Operations & Maintenance In Progress — program framework and standards documented in this
revision; quarterly gravity main
cleaning active and logged in
OpenGov EAM; ten-plus years of
Annual PM program review
11 / 352
SSO mapping confirms no
significant recurring geographic
hotspot locations — spills
distributed across system; CCTV
recording protocol being
established; GIS edit log, manhole
inspection cadence, and critical
spares program implementation
ongoing; target Q4 2026
V Design & Performance
Provisions
In Progress — design standards
current; inspection method SOP in
development target Q3 2026;
mandatory lateral certificate
program evaluated — active
implementation not pursued at this
time due to staffing constraints
and program design limitations;
permit counter lateral condition
fact sheet under development
(target Q3 2026); voluntary
inspection program under
development pending fee
schedule adoption and capacity
review
Upon standard revisions;
upon LMC update
VI Overflow Emergency
Response Plan
Complete — existing OERP
current; time-based response
metrics, post-incident review
process, and annual drill schedule
added.

Annual drill; post-incident as
needed
VII FOG Control Program In Progress — trigger-based FSE inspection program being
established; preliminary FSE
inventory compiled; FOG
Inspector Certification complete;
updated FSE permit package and
hauling log developed; online
disposal record submission portal
under consideration; County
Environmental Health MOU
pending; LMC ordinance revision
pending; target Q4 2026 for
trigger-based program operational
Annual FSE outreach; upon
ordinance adoption
VIII System Evaluation & Capacity
Assurance
2025 Sewer Master Plan Update
(PACE Engineering) was adopted
by the Board of Directors in
February 2026 and incorporated
as the District's current system
evaluation and Capital
Improvement Plan foundation.

Upon SMP update (est. 2035)
12 / 352
IX Monitoring, Measurement &
Program Modifications
In Progress — KPI framework
established (Element I); SSO
Trends Table update and formal
review cadence documentation
pending completion of this update;
target Q3 2026 for full
implementation
Quarterly data review; annual
formal review
X Program Audits Complete — triennial audit
language corrected; 2022–2025
audit incorporated; CAP tracking
and operator participation
documentation established
Triennial (next: 2025–2028
cycle)
XI Communication Program In Progress — existing
communication channels
documented; annual outreach
calendar and public feedback
process pending; target Q3 2026
Annual outreach calendar
review
A detailed element-by-element compliance status summary, including prior audit findings and specific corrective actions taken in this revision, is provided in Appendix 10.C.

Certification and Availability
This SSMP has been prepared by the City of Lakeport Compliance Officer and reviewed by the Utilities Director. Upon finalization, it will be certified in the California Integrated Water Quality System (CIWQS) by the Compliance Officer, who is authorized to certify SSO reports on behalf of the CLMSD Director.

This document is maintained on file at the City of Lakeport Utilities Department and is available for public inspection upon request. It will be made available to the State Water Resources Control Board or the Regional Water Quality Control Board upon request, consistent with the requirements of Order WQ 2022-0103-DWQ.

Operator input was solicited during the development of this revision, consistent with the participation requirements of Order WQ 2022-0103-DWQ. Documentation of operator participation is retained in Appendix C. 13 / 352
Element I — Goals
Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee must develop goals to properly manage, operate, and maintain all parts of its sanitary sewer system in order to reduce and prevent SSOs, as well as to mitigate any SSOs that do occur.

1.1 Purpose and Mission
Safe, reliable, and environmentally responsible sewer service is a core function of the City of Lakeport Municipal Sewer District. The District's mission is to provide these services while protecting Clear Lake and the surrounding environment, maintaining high-quality customer service, and supporting the long-term economic vitality and livability of the City of Lakeport.

The District's mission statement reflects this commitment:
"The District is dedicated to fostering a safe and picturesque environment that enhances the quality of life for our community; it is our responsibility to promote the health and safety of City residents and visitors. We are committed to being responsive to the needs of the community, exercising innovation in sustaining and growing a vibrant place in which to live, work, and do business."

1.2 Program Goals
In support of this mission, the District has established the following goals for the management, operation, and maintenance of its wastewater collection system. These goals reflect both the requirements of Order WQ 2022-0103-DWQ and the District's commitment to continuous improvement in system performance and regulatory compliance. • Minimize sanitary sewer overflows (SSOs) and mitigate the impacts of any SSOs that do occur. • Prevent public health and environmental hazards, with particular attention to the protection of Clear Lake. • Maintain adequate conveyance capacity with a minimum of inflow and infiltration (I&I), consistent with the 2025 Sewer Master Plan Update.
• Implement a risk-based rehabilitation and capital improvement program to address aging infrastructure and extend the useful life of collection system assets.
• Reduce fats, oils, and grease (FOG) contributions to the collection system through active inspection, outreach, and enforcement.
• Respond to SSOs and service interruptions promptly and effectively, minimizing impacts to customers and the environment.
• Use available operations, maintenance, and capital funds in an efficient and accountable manner. • Perform all operations safely to protect the health and wellbeing of District staff, contractors, and the public. • Institutionalize data-driven performance monitoring and continuous program improvement through annual KPI review and triennial SSMP audits.
14 / 352

1.3 Performance Measures and Key Performance Indicators The 2022–2025 Triennial SSMP Audit identified the absence of measurable performance indicators as a primary basis for Element I non-compliance. To address this finding, the District has established a formal Key Performance Indicator (KPI) framework tied directly to the goals listed in Section 1.2. KPIs are tracked using CIWQS data, the District's SSO Tracking Spreadsheet, OpenGov EAM work order records, and the adopted 2025 Sewer Master Plan Update.

KPI performance is reviewed quarterly for incident-level metrics and annually for program-level metrics. Results are documented in the SSMP Change Log and inform adjustments to the preventive maintenance program, CIP prioritization, FOG enforcement, and other program activities. Annual review findings are reported to the Utilities Director.

Note: KPIs 3 and 5 below are based on trend tracking at this time. As the updated SSO Tracking Spreadsheet accumulates additional years of data, specific numeric benchmarks will be established during the annual performance review cycle. KPIs 5 and 6 are most meaningful as multi-year trends given the relatively low annual SSO frequency in the system.

Table 1.1 — CLMSD Key Performance Indicators
Program Goal Key Performance
Indicator
Target /
Benchmark
Data Source Review
Frequency
Minimize SSOs Total SSOs per
calendar year
≤ rolling 3-year
average; anomalies
evaluated
CIWQS; SSO
Tracking
Spreadsheet
Quarterly /
Annual
Reduce surface water
impacts
SSOs reaching
surface waters
Zero where
feasible; immediate
containment when
unavoidable
CIWQS spill
reports; response
logs
Per incident /
Annual
Improve SSO
response
effectiveness
Average time from
notification to
containment
Track and reduce
trends; benchmark
to be set after 2
years of data
Work orders;
incident logs
Quarterly
Improve spill recovery
outcomes
Percent of estimated
spill volume
recovered
≥ prior-year
average; continuous
improvement
CIWQS volume
estimates
Annual
Reduce repeat
blockages in highfrequency areas
Repeat SSOs at
previously
documented spill
locations
Downward trend
year-over-year
(multi-year basis);
note: ten-plus years
of mapping shows
minimal recurring
geographic hotspots
— spills distributed
across system
GIS SSO incident
map;
maintenance logs
Annual
Reduce FOG-related
blockages
Percent of SSOs
attributed to FOG
Decreasing trend
following FOG
program
implementation
(multi-year basis)
CIWQS cause
codes; FOG
inspection records
Annual
15 / 352
Control I&I Peak wet weather
flow (PWWF) to
ADWF ratio
Maintain or reduce
long-term ratio.

Current baseline:

6.4x (Feb 2019
peak event, 2.31
MGD PWWF / 0.36

MGD ADWF)
WWTP flow
records; rainfall
data
Annual
Reduce I&I through
rehabilitation
Linear feet of pipe
relined, replaced, or
sealed annually
Progress toward
2025 SMPU
rehabilitation
targets; ~$3.2M
program to reduce
~0.9 MGD of I&I
CIP tracking;
contractor records
Annual
Maintain adequate
system capacity
Modeled sewer and
WWTP capacity vs.
projected flows
ADWF remains
below 85% of 0.53

MGD WWTP
capacity; capacity
maintained per
2025 SMPU
assumptions
2025 SMPU;
WWTP flow
records; CIP
Annual
Implement planned
capital improvements
Completion of SMPidentified CIP
projects per adopted
staging schedule
Projects completed
per 2025 SMPU
Table ES-1 staging.

Immediate term:
$14,010,000 (2025–
2030)
CIP tracking log;
SMP Table ES-1
Annual
Institutionalize
continuous
improvement
Completion of
annual SSMP
performance review
Annual review
completed and
documented each
calendar year
SSMP Change
Log; audit records
Annual

1.4 Performance Review and Adaptive Management
KPI results are reviewed on the schedule described in Table 1.1 and formally compiled in an annual performance summary.

The annual review is conducted by the Compliance Officer and presented to the Utilities Director. Findings from the review directly inform program adjustments, including:
• Modifications to the preventive maintenance program and priority cleaning schedule (Element IV); • Updates to FOG inspection priorities and enforcement activity (Element VII); • Adjustments to CIP project sequencing or scope based on system performance data (Element VIII); • Revisions to SSO response protocols based on response time or recovery trends (Element VI); and • Updates to the SSMP itself, logged in the Change Log (Appendix 10.D).

This adaptive management approach ensures that the SSMP remains a living, responsive document rather than a static compliance artifact. Where KPI data indicates a trend in the wrong direction over two or more consecutive review periods, 16 / 352
the Compliance Officer will initiate a formal program review and document corrective actions in the CAP log (Appendix

10.C).

1.5 Plan Updates
This SSMP is updated following each triennial audit cycle or in response to significant changes in system conditions, organizational structure, regulatory requirements, or planning foundations. The next scheduled update is due following the 2025–2028 triennial audit cycle.

The 2025 Sewer Master Plan Update (PACE Engineering, February 2026) serves as the District's current capital and capacity planning foundation and is recommended by the engineer for re-evaluation within ten years. Any material update to the Master Plan that affects capacity assumptions, CIP priorities, or design criteria will trigger a corresponding SSMP update to Elements I, VIII, and IX.

1.6 Risk Management and Worst-Case Scenario Planning
The District acknowledges the following primary system risks, each of which is addressed through a corresponding program element or capital improvement:

Risk Current Condition Addressed By
High I&I during wet weather
events
PWWF reached 77% of design
capacity (Feb 2019). Flows can
exceed 8x ADWF during peak rain
events.
2025 SMPU I&I reduction
program; ongoing CCTV and
rehabilitation (Element IV, VIII)
Aging infrastructure ~48% of collection system installed 1920–1959. Vitrified clay and
Orangeburg pipe predominant in
oldest sections.

Risk-based rehab prioritization;
CIP staging per 2025 SMPU Table
ES-1 (Element IV, VIII)
FOG blockages FOG attributed to 22% of SSOs in
2022–2025 audit period. FOG
program was largely inactive prior
to this update.

Modernized FOG inspection,
enforcement, and education
program (Element VII)
Pump station failures 11% of SSOs in the audit period
are attributable to pump station
failures. Largest single SSO (1,600
gal, July 2024) was pump station
event.

Lift station PM program; backup
power (MTS); bypass connection
installations per CIP (Elements IV,
VI)
Root intrusion and debris
blockages
Root intrusion is the leading SSO
cause at 33% of events; debris at
22%. Concentrated in older clay
pipe sections.

Priority segment cleaning
program; CCTV inspection
program; targeted lining and
replacement (Element IV)
Worst-case scenario planning for SSO response is addressed in the District's Overflow Emergency Response Plan (Element VI). The OERP identifies response protocols for high-volume spills, pump station failures, and spills to surface waters, including notification to CalOES and the Regional Water Quality Control Board consistent with Order WQ 2022-0103-DWQ requirements.
17 / 352
Element II — Organization
Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee's SSMP must identify: (1) the name of the agency's responsible or authorized representative; (2) the names and telephone numbers for management, administrative, and maintenance positions responsible for implementing specific measures in the SSMP program, including lines of authority shown in an organization chart or similar document with narrative explanation; and (3) the chain of communication for reporting SSOs, from receipt of a complaint or other information, including the person responsible for reporting SSOs to the State and Regional Water Board and other agencies.

2.1 Organizational Structure
The City of Lakeport Municipal Sewer District (CLMSD or District) is a public wastewater operations and service entity governed by a Board of Directors, whose members also serve as the City Council. The District is managed through the City's Utilities Department under the direction of the City Manager, who also serves as the CLMSD Director.

The Utilities Department is divided into three functional areas relevant to sewer system management: Administration, Compliance, and Operations. The organizational structure and lines of authority for key positions are described below. An organizational chart is provided in Appendix 2.A.

Position / Title Primary Responsibilities
Board of Directors Establishes policy; adopts ordinances; sets user fees and penalties for infractions.

City Manager / CLMSD
Director (Kevin Ingram)
Manages general fiscal and administrative functions of the City; enforces District policy; allocates resources; authorizes third-party contractor services; provides general direction for District operations.

City Engineer (Paul Curren) Reviews and assists with preparation of wastewater collection system planning documents; manages capital improvement delivery; documents new and rehabilitated assets.

Utilities Director (Paul
Harris)
Directs and oversees all aspects of the Utilities Department; provide highly responsible and complex administrative support to the City Manager; under administrative direction, plans, organizes, manages and directs the activities of the Utilities Department including water systems, sewer systems, underground construction, mechanical/electrical/controls, I&I, GIS, and local, State, Federal regulatory compliance; construction administration and design review; serves as member of the City's management team; assumes additional responsibilities as assigned; performs related duties as required.

Compliance Officer (Jen
Baker)
Primary responsibility for sewer code enforcement, serves as the first administrative responder to SSO incidents, SSO monitoring and CIWQS reporting, and coordinates the development, implementation, and maintenance of the SSMP, including the FOG and I&I programs. Authorized to certify electronic spill reports on behalf of the CLMSD Director.

Chief Building Official
(Bethany Moss Childers)
Monitors, evaluates, and approves new sewer connections to the District system, ensuring they meet all applicable standards and requirements. 18 / 352
Utilities Superintendent
(Forrest Stogner)
Oversees day-to-day field operations; coordinates preventive and corrective maintenance activities; ensures operational readiness of lift stations and collection system infrastructure.

Water/Wastewater
Treatment Supervisor
(Mark Fetzer)
Supervises water and wastewater treatment operations; may serve as first field responder to sewer issues; delegates tasks and responsibilities to field crews for preventive and corrective maintenance.

Utilities Underground
Supervisor (Dylan
Teverbaugh)
Supervises underground utility field operations including sewer main and lateral maintenance, repair, and inspection activities. Serves as first field responder to sewer issues.

GIS mapping and system record updates are performed by an outside vendor under the direction of the Utilities Department.

The Utilities Director coordinates requests for GIS updates, and the Compliance Officer maintains the GIS edit log described in Element IV.

2.2 Authorized Representative and Certification Authority The District's authorized representative in all wastewater collection system matters is the CLMSD Director (City Manager Kevin Ingram). The CLMSD Director has designated the Utilities Director and the Compliance Officer with the authority to certify electronic SSO reports submitted to the State Water Resources Control Board through CIWQS.

The Compliance Officer is authorized to submit SSO notifications and reports to all applicable agencies, including the North Coast Regional Water Quality Control Board, the Lake County Environmental Health Department, the Lake County Air Quality Management District, and the California Governor's Office of Emergency Services (CalOES), consistent with the requirements of Order WQ 2022-0103-DWQ and the District's SSO Reporting Requirements Reference Guide (Appendix

2.B).

2.3 Contact Information
Current contact information for key positions is maintained in the CLMSD Contact List (Appendix 2.A) and Figure 2.B below.

The contact list is reviewed quarterly by the Compliance Officer. Any changes are updated promptly and logged in the SSMP Change Log (Appendix 10.D).

Figure 2.B — CLMSD Contact List | Updated April 2026
Position / Title Name Telephone
City Manager / CLMSD Director Kevin Ingram (707) 263-5615 x104 City Engineer Paul Curren (707) 263-3578 x407
Utilities Director Paul Harris (707) 263-3578 x402
Compliance Officer Jen Baker (707) 263-3578 x403
Chief Building Official Bethany Moss Childers (707) 263-5615 x202 Utilities Superintendent Forrest Stogner (707) 263-3578 x701 Water/Wastewater Treatment Supervisor Mark Fetzer (707) 263-3578 x704 Utilities Underground Supervisor Dylan Teverbaugh (707) 263-3578 x706 I
I
I
I
l
I
I
l
19 / 352

2.4 Chain of Communication for SSO Reporting
The following chain of communication governs how SSO incidents are reported and escalated within the District. This chain is used in conjunction with the SSO Reporting Requirements Reference Guide (Appendix 2.B) and the Overflow Emergency Response Plan (Appendix 6.C).

Step Action Responsible Party
1 Spill or overflow is identified by field staff, public complaint, or SCADA alarm
Field staff / Dispatch / Answering service (after
hours)
2 First responder field staff respond, verify the
spill, and notify their immediate supervisor and
Compliance Officer simultaneously. Begin
containment and mitigation efforts
First responder/Field Staff
3 The supervisor notifies the Utilities Director, who
coordinates the remediation effort
Applicable Supervisor
4 Compliance Officer reports to spill site, conducts
all required SSO notifications and CIWQS
reporting per Order WQ 2022-0103-DWQ and
City policy
Compliance Officer
5 If the spill is ≥1,000 gallons and reaches a
drainage channel or surface water (Category 1),
the CLMSD Director /City Manager is notified
immediately
Compliance Officer or Utilities Director notifies
CLMSD Director / City Manager

2.5 Training and Documentation
All key personnel identified in this element are trained in the SSO reporting and response communication chain. Training is documented, and sign-in sheets are retained in the Compliance Department records. Personnel responsible for CIWQS certification receive orientation on reporting requirements and authorized representative protocols upon assignment to that role.

The contact list and organizational chart are reviewed annually by the Compliance Officer or immediately upon any staffing change affecting SSMP responsibilities. Any staffing changes affecting SSMP responsibilities are reflected in the contact list and logged in the SSMP Change Log (Appendix 10.D) within 30 days of the change. 20 / 352
Element III — Legal Authority
Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee's SSMP must demonstrate, through sanitary sewer system use ordinances, service agreements, or other legally binding procedures, that it possesses the necessary legal authority to: (1) prevent illicit discharges; (2) require proper design and construction of sewer connections; (3) ensure access for maintenance, inspection, and repairs to publicly owned portions of laterals; (4) limit the discharge of FOG and other debris that may cause blockages; and (5) enforce violations of its sewer ordinance.

3.1 Primary Legal Authority — Lakeport Municipal Code Chapter 13.20 The primary legal authority for CLMSD's operation of the sanitary sewer collection system is established under Lakeport Municipal Code (LMC) Chapter 13.20, Sewer Use and Pretreatment Regulations, adopted pursuant to Ordinance No. 872.

Under LMC Chapter 13.20, any residence or facility within the boundaries of CLMSD is required to connect to the municipal sanitary sewer system, with limited exceptions.

LMC Chapter 13.20 defines the authority and mechanisms granted to CLMSD to ensure that discharges to the collection and treatment system are not harmful to the environment or destructive to existing infrastructure. It establishes specific discharge regulations, pretreatment standards, and prescribed enforcement actions, and it provides the legal foundation for the District's Fats, Oils, and Grease (FOG) Control Program and Sewer Lateral Certificate Program. Key provisions include requirements for grease traps and interceptors to be installed and maintained by all users who produce or discharge FOG.

LMC Chapter 13.20 is currently under review for comprehensive revision. The update will modernize FOG enforcement provisions, update penalty schedules to reflect current economic conditions, and clarify inspection and industrial user program authority. A revision timeline will be established upon formal engagement with the City Attorney. The FOG program update is described in further detail in Element VII.

A complete copy of LMC Chapter 13.20 is included in Appendix 3.A. Supporting documents referenced in this element include:
• Fines for Violation of the FOG Program — Resolution No. 2315 (2008) (Appendix 3.B) — currently under review for update
• Utilities Department Policies U-3, U-4, and U-6 (Appendix 3.C) • Mutual Aid Agreement with Lake County Sanitation District — LACOSAN (Appendix 3.D)

3.2 Authority to Prevent Illicit Discharges and Control I&I LMC Chapter 13.20 requires that all identified sources of inflow and infiltration (I&I) be corrected upon discovery. The District actively investigates I&I sources and continuously works to identify and track new sources. While significant fiscal constraints have historically limited the pace of I&I correction, the adopted 2025 Sewer Master Plan Update establishes a prioritized I&I reduction program targeting the highest-impact areas of the collection system. I&I sources and rehabilitation needs identified through CCTV inspection and flow monitoring are tracked in the District's asset management and GIS records.

CLMSD is also granted permit authority under LMC Chapter 13.20 to regulate discharge from nondomestic industrial users, classified as Class I through IV under LMC Section 13.20.290. A formal industrial user survey has not been conducted to 21 / 352
date. Based on a preliminary review of commercial land uses in the service area, the District has identified several nondomestic user categories that may warrant formal classification under the LMC, including auto body and collision repair facilities, automotive service operations, dry cleaning establishments, a local environmental testing laboratory, and potentially metal fabrication or machining operations. These user types may be subject to federal categorical pretreatment standards under 40 CFR Subchapter N, depending on their specific processes and discharge characteristics. As a corrective action from this revision, the Compliance Officer will conduct a nondomestic user survey to identify, characterize, and appropriately classify nondomestic users connected to the CLMSD system. The survey will cross-reference the City's business license database and building permit records against the LMC classification criteria. Any users identified as Class I or II will be notified and required to apply for a wastewater discharge permit consistent with LMC Section 13.20.300. Target completion of initial survey: Q4 2026. Permitting to follow survey completion: target Q2 2027.

3.3 Rights of Entry
LMC Section 13.20.340 provides CLMSD personnel with the legal right to inspect connections, appurtenances, and other components of the municipal sanitary sewer collection system on private property where illicit discharges are known or suspected. Persons or occupants of premises where wastewater is generated or discharged shall allow the District or its authorized representative ready access to all parts of the premises for inspection, sampling, compliance monitoring, and records examination. Users must allow access during regular business hours with appropriate notice.

The Compliance Officer is responsible for ensuring these access rights are exercised appropriately and that the public is informed of their obligations under the ordinance.

3.4 Enforcement Mechanisms
The enforcement mechanisms available to CLMSD for violations of LMC Chapter 13.20 include, in order of escalation:

1. Informal administrative action, including notices of violation and written warnings

2. Administrative orders, compliance schedules, and other corrective action directives

3. Fines and fees

4. Penalties for non-compliance

5. Assessment of charges for damage to CLMSD facilities or operations

6. Suspension or termination of sewer service

7. Civil action

8. Criminal action
Fines related to the general provisions of the Sewer Use regulations can range from $300 to $1,000 per day per violation, depending on the nature of the infraction. The applicability and severity of fines are at the discretion of the Utilities Director or designee. Resolution No. 2315 (2008) (Appendix 3.B) prescribes specific fines and fees for violations or noncompliance with FOG program provisions. This resolution is currently under review for update as part of the LMC Chapter 13.20 revision effort, with the intent to align penalty levels with current enforcement practice and economic conditions.

3.5 Construction and Design Standards
Through resolution and by reference in the Lakeport Municipal Code, the City has adopted the California Plumbing Code (California Code of Regulations, Title 24, Part 5) as its standard for sewer construction and connections. The City has also adopted sewer infrastructure construction and design standards, which are discussed in Element V and referenced in Appendix 5.
22 / 352

3.6 Interagency Agreements
CLMSD maintains a mutual aid agreement with the Lake County Sanitation District (LACOSAN). Under this agreement, wastewater flows in the northern portion of the CLMSD service area can be directed to the County's collection system when needed. Conversely, wastewater flows from County areas south of the CLMSD collection area are accepted by CLMSD.

This agreement supports system resilience and provides operational flexibility during high-flow or emergency conditions. A copy of the agreement is included in Appendix 3.D.
23 / 352
Element IV — Operations and Maintenance Program
Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee's SSMP must include: (1) maintenance of up-to-date collection system maps; (2) a preventive O&M program with scheduled cleaning and increased frequency at known problem areas; (3) a rehabilitation and replacement plan to identify and prioritize deficiencies; (4) a training program for staff and contractors; and (5) an equipment and critical replacement parts inventory.

Implementation Status — In Progress
The program framework and standards are documented in this revision. Full field implementation of the GIS edit log, standardized manhole inspection cadence, CCTV-to-asset-record integration, and critical spares tracking program is ongoing. Target: Q4 2026.

4.1 System Description and Asset Inventory
The CLMSD wastewater collection system serves the City of Lakeport and adjacent unincorporated areas. A summary of key system assets is provided below. A current collection system map is included in Appendix 4.A.

Table 4.1 — CLMSD Collection System Asset Summary
Asset / Component Current Inventory Source
Gravity sewer mains 30.23 linear miles 2025 SMPU
Force mains (estimated) 2.4 linear miles Distance measured using the system map
and electronic map
measuring tools
Public sewer laterals ~10 linear miles City Records
Service laterals ~1,521 2025 SMPU
Manholes 568 2025 SMPU
Sewage lift stations 8 2025 SMPU
Pipe materials Vitrified clay, Orangeburg,
asbestos-cement, PVC
2025 SMPU
Predominant installation eras 1920–1939 and 1940–1959
(~48% of system)
2025 SMPU
24 / 352

4.2 Collection System Mapping and GIS Records
The District maintains an Esri-based GIS map of its wastewater collection system, including all gravity mains, manholes, lift stations, force mains, pressure pipes and valves, and known stormwater connections. GIS mapping and system record updates are performed by an outside vendor under the direction of the Utilities Department. Field staff submits map correction requests and new asset information directly to the Compliance Officer, who logs each request in the GIS Edit Log and forwards them to the Utilities Director for submission to the GIS vendor. The Compliance Officer records completion on the log once updates are confirmed incorporated.

GIS Map Edit Log
A one-page Map Edit Log is maintained by the Compliance Officer capturing: date, asset ID, description of change, information source, requesting staff, and approver. The GIS vendor incorporates edits quarterly. The log is reviewed each quarter to confirm all pending updates are processed and filed in Compliance Department records.

Emergency Map Pack
An offline Emergency Map Pack of PDF map tiles covering all lift station service areas and high-risk segments is under development for field tablets and mobile devices. Updated at a minimum annually and whenever significant system changes occur, ensuring field access to current maps when internet connectivity is unavailable.

4.3 Preventive Maintenance Program
All preventive maintenance is planned and tracked in Enterprise Assest Management, the District's system of record for work orders, asset condition, and maintenance history. The Utilities Department underground crew or contracted construction crews perform routine and emergency repairs, including sewer replacements, spot repairs, lateral and service tap replacements, and manhole repairs.

Quarterly Priority Cleaning Program
Gravity main cleaning is performed on a routine quarterly basis throughout the collection system. Cleaning is conducted by hydraulic methods; mechanical methods are used where hydraulic cleaning is insufficient. Known problem locations, including areas with recurring root intrusion, FOG accumulation, or prior SSO history, are prioritized within the quarterly schedule. Cleaning activities are tracked in EAM by work order. The priority cleaning list is also maintained as a laminated reference in the crew room. EAM generates work orders automatically when scheduled cleaning is due.

4.4 Inspection and Condition Assessment
Systematic inspection is a core O&M program component. Inspection findings drive maintenance prioritization, rehabilitation planning, and GIS record updates. Three primary inspection methods are used.

Visual Inspections
Performed on manholes and accessible components during routine field activities. Covers: frame and cover condition, flow surcharging, manhole channel condition, structural integrity, I&I evidence, debris or grease in line, and miscellaneous defects. Staff document and report deficiencies to supervisors for OpenGov EAM work order entry.

I
I
I
25 / 352
CCTV Inspection
CCTV inspection is conducted by Utilities Division field staff as a field assessment tool in response to blockages, SSO events, and suspected deficiencies. Between 2018 and 2025 approximately 44,000 LF of the collection system was inspected by CCTV (Source 2025 Sewer Master Plan Update) Findings are documented in OpenGov EAM work orders and SSO reports as narrative observations. Stored video and systematic defect coding are not currently part of the standard inspection workflow. Development of a formal CCTV records retention practice is a program improvement target; see Appendix 10.C.

Manhole Inspection Program
Development of a systematic program targeting ~100 manholes/year for full system-wide coverage of all 568 manholes over five years. Findings will be linked to manhole asset records in OpenGov EAM. The Compliance Officer to maintain a tracking dashboard (inspected / defects found / repaired) reviewed quarterly, with full integration target Q4 2026.

4.5 Lift Station Operations and Preventive Maintenance
The District operates eight sewage lift stations: Lakeshore Boulevard, Rose, Clear Lake, C Street, Martin Street, Lakeport Boulevard, Larrecou, and Linda Lane. All stations have flow meters and one spare backup pump. Stations without stationary generators are equipped with connector plugs and manual transfer switches (MTSs) for rapid portable generator connection.

All stations and the WWTP are monitored via the 2024-upgraded SCADA system with a dedicated server, PLCs, cellularbackup radios, and VPN remote access.

Tier 1 / 2 / 3 Preventive Maintenance
Lift stations follow a rotating Tier 1–3 PM program. Tier 1: alarm test. Tier 2: flows and pump run with float checks.

Tier 3: site housekeeping. Tier 1 and Tier 2 activities are documented on hardcopy forms. Electrical maintenance (EMT) and amp readings are conducted annually by the Electrical Maintenance Technician (EMT) and documented separately. The long-term goal is to migrate all PM records into EAM.

4.6 Rehabilitation and Replacement Plan
The 2025 Sewer Master Plan Update (PACE Engineering, February 2026) serves as the District's rehabilitation and CIP planning foundation, superseding the 2008 Master Sewer Plan. Repair methods include point repairs, CIPP lining, slip lining, and full replacement, selected by defect type, pipe size, access constraints, and cost-effectiveness. 2025 SMPU Near-Term Rehabilitation Priorities
• 53 locations recommended for spot repairs
• 1,300 LF of pipeline recommended for replacement
• 4,500 LF of pipeline recommended for lining
• I&I reduction program — ~$3.2M targeting ~0.9 MGD reduction • Bypass connection installations at all 8 lift stations • Chlorination at Larrecou; dichlorination at Linda Lane 26 / 352
Rehabilitation & Replacement
Rehabilitation and replacement priorities are currently informed by the 2025 Sewer Master Plan Update (PACE Engineering, February 2026), which identifies system deficiencies and establishes long-term capital improvement priorities. Near-term decisions are guided by pipe age and material, SSO history, and field observations documented in OpenGov EAM. A formal risk-based prioritization framework is under development; target implementation Q1 2027, pending completion of systematic CCTV-to-asset-record integration.

Recently Completed Projects (2022–2025)
• 2024: Water/Sewer Main Replacement — 2,760 LF sewer main, 27 service laterals • 2024: SCADA upgrade — dedicated server, updated PLCs/radios, VPN remote access • 2024: Martin Street sewer upgrades
• 2025: Sodium hypochlorite conversion at WWTP (In Progress)

4.7 Training Program
All wastewater collection system personnel, except operator trainees, are required to hold a minimum Grade I (G1) wastewater operator certification. The WWTP is a Grade II facility requiring a chief operator with at least Grade II (G2) certification. All certifications must be maintained without interruption with all continuing education requirements met. As a small agency, Public Works staff from other divisions may assist with major SSO responses and receive applicable training.

Training Program Components
• Injury and Illness Prevention Program (IIPP) — formal safety policies reviewed and updated as required • Workplace safety tracking service — training reminders, completion records, and safety materials • Regularly scheduled Public Works safety meetings with job-specific training for Utilities Division staff • Annual SSO response training: spill volume estimation, cleanup practices, and CIWQS reporting procedures • Confined space entry policy review and CalOSHA compliance • SDS review prior to use of new chemicals
• Operator certification renewals and continuing education • Class B DMV license and CPR/First Aid certification renewals Training Matrix (In Development)
A training matrix identifying roles, courses, and minimum frequency is being developed. It will document annual SSO response and confined space refreshers as baseline requirements. Goal: at least 2 staff holding CWEA Collection System Maintenance Grade I within 24 months of SSMP adoption. Contractor sign-backs for SSO reporting procedures are filed with each project and copied to the internal safety coordinator.

4.8 Equipment, Critical Replacement Parts, and Recordkeeping The District maintains essential equipment, including a vacuum/Vactor truck, CCTV equipment, portable generators, bypass pumps, backhoes, dump trucks, router/snake, gas detectors, confined space entry equipment, and PPE. Smaller tools and PPE are stored in service vehicles for immediate field access. Larger assets including emergency generators are housed at the Corporation Yard.
27 / 352
Critical Spare Parts Program (In Development)
A critical spares list is being developed per lift station and pump model, identifying minimum on-hand quantities and reorder points. Quarterly inventory counts will be recorded in EAM. Where feasible, a monthly standby pump start/swap check is performed and documented. This formalizes what has historically been managed through visual monitoring and vendor account ordering.

Recordkeeping and Documentation
Enterprise Asset Management by OpenGov is the system of record for all asset tracking, PM work orders, inspection findings, equipment inventory, and maintenance history. All O&M records are retained per the District's records retention policy and made available to the SWRCB, RWQCB, or their representatives upon request. The GIS Edit Log (Appendix

4.A) documents a list of all updates to the collection system GIS. 28 / 352
Element V — Design and Performance Provisions
Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee must: (1) identify design and construction standards and specifications for the installation of new sanitary sewer systems, pump stations, and other appurtenances, and for the rehabilitation and repair of existing sanitary sewer systems; and (2) identify procedures and standards for inspecting and testing new sewers, pumps, and other appurtenances, and for rehabilitation and repair projects.

5.1 Design and Construction Standards
CLMSD's design and construction standards for the sanitary sewer collection system are established through two complementary frameworks: the California Uniform Plumbing Code (California Code of Regulations, Title 24, Part 5), which sets minimum statewide standards for all sewer construction; and the City of Lakeport's adopted Sewer System Design and Construction Standards (Appendix 5), which provide additional detail and requirements specific to the CLMSD system.

The adopted design standards apply to all new construction, rehabilitation, and improvements that will be dedicated to the public and accepted by CLMSD for maintenance or operation. They are also posted on the City's website for access by engineers, contractors, and property owners. The City Engineer is responsible for maintaining the standards and specifications and for ensuring compliance by both City construction crews and private third-party contractors.

All improvements within City rights-of-way must be installed in accordance with the City's adopted improvement plans and specifications at the City Engineer's discretion. New sanitary sewer system installations, pump stations, and appurtenances are designed and constructed to meet the area’s service needs and conform to these adopted standards.

Standard / Authority Scope and Application
California Uniform Plumbing Code
(CCR Title 24, Part 5)
Minimum statewide standards for all sewer construction, adopted by reference in the Lakeport Municipal Code.

CLMSD Sewer System Design and
Construction Standards (Appendix
5)
City-adopted standards providing additional requirements for new construction, rehabilitation, and improvements including service laterals, cleanouts, manholes, rodding inlets, and private lift station discharge lines.

LMC Section 13.20.190
Connection Requirements
Requires all connections and modifications to the sanitary sewer to be reviewed and approved by CLMSD as a condition of the building permit.

LMC Section 13.20.320.F Sewer
Lateral Certificate Program
Establishes triggering events that require cleaning, inspection, and testing of private sewer laterals before a sewer lateral certificate of compliance is issued.

5.2 Connection Requirements and Approval Process
All connections and modifications to the CLMSD sanitary sewer system require review and approval as a condition of the requisite building permit, consistent with LMC Section 13.20.190. The Chief Building Official is responsible for evaluating proposed new connections and ensuring they meet all applicable design and construction standards prior to approval. This review provides a critical point of control to prevent substandard connections that could contribute to I&I or future SSOs. 29 / 352
Any residence or facility within CLMSD boundaries is required to connect to the municipal sanitary sewer system, with limited exceptions as provided in LMC Chapter 13.20. New public lift stations are designed and constructed to meet the specific capacity and service needs of the area being served.

5.3 Inspection and Testing Procedures
CLMSD employs a combination of inspection and testing methods for new construction, rehabilitation projects, and private sewer laterals. The selection of method is based on the type of infrastructure, project scope, and field conditions. The following methods are used:

Method Application Authority / Notes
Smoke testing Primary method for inspecting public
sewer mains and cleanouts in the public
right-of-way; identifies open cleanouts,
leaking manholes, and damaged sewers.

Routine and I&I investigation use;
conducted by field crews.

CCTV inspection Used for public mains, cleanouts, and
private laterals where further investigation
is required beyond visual or smoke
testing. Also used for post-repair
verification.

Authorized by field supervisor,
Utilities Director, or Compliance
Officer. Follows NASSCO PACP
standards.

Visual inspection Cleanouts in the public right-of-way are typically inspected visually; used as a firstline assessment before escalating to CCTV.

Performed by field crews during
routine maintenance.

Dye testing Used to confirm results from visual
inspection; particularly useful for tracing
suspect connections or I&I sources.

Supplemental method; employed
as needed.

Hydrostatic pressure
testing
Rarely used for sewer components,
private or public. Applied only in specific
circumstances where other methods are
insufficient.

Field crews; limited application.

5.4 Private Sewer Lateral Program
LMC Section 13.20.320.F establishes the framework for a Sewer Lateral Certificate of Compliance program. Under this framework, private sewer laterals are subject to cleaning, inspection, and testing upon the occurrence of specific propertyevent triggers, including building permit applications for significant remodels, change of use, installation of additional toilet facilities, main sewer repair or replacement, and account closures. The program has been in place since Ordinance No. 872 was adopted in 2008.

Few Sewer Lateral Certificates of Compliance have been issued since adoption. Implementation of mandatory trigger-based inspections has been inconsistent due to staffing constraints and limited inter-departmental coordination at the permit counter. Active mandatory enforcement of the program as currently written is not being pursued at this time. 30 / 352
The program framework will be re-evaluated as part of the comprehensive LMC Chapter 13.20 revision described in Element III. That revision will assess whether the current trigger structure, certificate terms, and administrative roles remain appropriate given staffing capacity and program design considerations.

Proactive I&I Education — Permit Counter Fact Sheet
As a proactive interim measure to inform property owners of their lateral responsibilities, a plain-language lateral condition fact sheet is being developed for distribution at the permit counter to all building and plumbing permit applicants. The fact sheet will describe: private lateral owner maintenance responsibilities under the LMC; common signs of lateral failure; the relationship between lateral condition and I&I; and how to request a voluntary inspection. Target completion: Q3 2026.

5.5 Inspection SOPs — Program Improvement
The 2022–2025 Triennial Audit found Element V compliant and noted that the combination of smoke testing, CCTV, visual inspection, and dye testing provides a robust and proactive program. The audit recommended formalizing the specific circumstances under which each inspection method is applied by documenting a Standard Operating Procedure (SOP) for new construction and rehabilitation inspections, to ensure consistency across all projects and field crews.

A Design and Construction Inspection SOP is being developed by the Compliance Officer in coordination with the City Engineer and field supervisors. The SOP will document: the trigger conditions for each inspection method; applicable standards (NASSCO PACP, California Plumbing Code); documentation requirements; and sign-off authority for new construction and rehabilitation project acceptance. Target completion: Q3 2026. 31 / 352
Element VI — Overflow Emergency Response Plan
Regulatory Requirement — Order WQ 2022-0103-DWQ
Each enrollee shall develop and implement an Overflow Emergency Response Plan (OERP) that identifies measures to protect public health and the environment, including: (1) proper notification procedures; (2) a program to ensure appropriate response to all SSOs; (3) prompt notification to regulatory agencies and affected entities; (4) procedures to ensure staff and contractors are trained; (5) procedures to address emergency operations including traffic and crowd control; and (6) a program to contain and minimize adverse environmental impacts from SSOs.

Implementation Status — Compliant with Deficiencies
The OERP framework is well-developed and operationally sound. Corrective actions from the 2022–2025 Triennial Audit address three specific gaps: real-time response time-stamping, formalized annual drill documentation, and a post-spill review process. These improvements are underway and documented in Sections 6.4, 6.5, and 6.6 below.

6.1 Overflow Emergency Response Plan — Overview
CLMSD's Overflow Emergency Response Plan (OERP), effective August 3, 2023, is the District's primary governing document for sanitary sewer overflow detection, response, containment, cleanup, and notification. The OERP is maintained as Utilities Division Policy U-11 and is included in Appendix 6.C. Copies are kept in policy binders at Public Works and Utilities sites and on the City’s Safety SharePoint.

The OERP establishes a 24-hour emergency contact system, delineates the chain of command for internal and external notifications, and provides detailed field guidance covering: first responder assessment; overflow correction, containment, and cleanup; traffic and pedestrian control; water quality monitoring and sampling; and spill volume estimation methods.

The District also maintains a Hazardous Materials Incident Response Plan (Appendix 6.B), which governs response to major emergencies involving chemical spills or uncontrolled releases threatening public health.

Supporting documents referenced in this element include:
• SSO Notification and Reporting Forms (Appendix 6.A)
• Hazardous Materials Incident Response Plan (Appendix 6.B) • SSO Emergency Response Plan — Utilities Division Policy U-11 (Appendix 6.C) • SSO Regulatory Reporting Requirements Reference Guide (Appendix 2.B)

6.2 Notification Procedures
CLMSD staff respond immediately to any report of an SSO or sewer system malfunction. Incident reports may come from any source —resident, business owner, law enforcement, fire, or SCADA alarm—and are typically received by telephone.

A 24-hour public emergency telephone number is maintained and posted on the City's website. 32 / 352
Step Internal Notification Action Responsible Party
1 Incident report received — by field staff,
public call, or SCADA alarm
Field staff / Dispatch / After-hours answering
service
2 Field staff receiving report simultaneously
notifies their immediate supervisor and
Compliance Officer
Various Staff
3 Compliance Officer notified; initiates all
required regulatory notifications and CIWQS
reporting.

Jen Baker
4 Utilities Director or designee notified;
coordinates and directs remediation effort
Paul Harris or his assigned designee
5 For Category 1 SSOs (≥1,000 gallons
reaching a drainage channel or surface
water): CLMSD Director / City Manager
notified immediately
Utilities Director or designee notifies Kevin Ingram
External notification requirements vary by SSO category and are detailed in the SSO Regulatory Reporting Requirements Reference Guide (Appendix 2.B). At minimum, all SSOs are reported through CIWQS consistent with Order WQ 2022- 0103-DWQ. Category 1 SSOs additionally require notification to the Regional Water Quality Control Board, CalOES, the Lake County Environmental Health Department, and any potentially affected water suppliers. The Compliance Officer is authorized to submit all required notifications and reports on behalf of the CLMSD Director.

6.3 Response Program and Field Operations
Upon arrival at the scene, field staff conduct an initial assessment to determine the source, estimated volume, extent of spread, and potential for the spill to reach a drainage channel or surface water. The Field Staff Spill Report form (Appendix

6.A) is completed in the field during the active response and documents key data, including: time of arrival, source location, estimated volume, containment actions taken, and cleanup methods used.

Response activities follow the protocols established in the OERP (Appendix 6.C) and include: source identification and correction; containment using equipment such as vacuum trucks, sandbags, and wattles; cleanup and disinfection of affected surfaces; traffic and pedestrian control; and water quality sampling where the spill has reached or potentially reached a drainage channel or surface water. Field staff are equipped with spill response materials in service vehicles.

All gravity line blockages are followed by CCTV inspection to identify the cause and assess pipe condition. Inspection findings are documented in EAM and used to inform maintenance prioritization and rehabilitation planning.

6.4 Response Time Metrics — Program Improvement
The 2022–2025 Triennial Audit found that while the OERP requires time-based documentation of SSO response, three specific timestamps are not yet consistently captured: (1) initial notification time, (2) first responder arrival time, and (3) CalOES notification time. These parameters are essential for assessing response timeliness and demonstrating compliance with Order WQ 2022-0103-DWQ reporting requirements.
33 / 352
The SSO Tracking Spreadsheet (2025 Edition) has been expanded to include dedicated fields for all three timestamps. This update was implemented as a corrective action from the 2022–2025 audit. Going forward, all three fields are required entries for every SSO event record. The Compliance Officer reviews timestamp data at each quarterly SSO program review for completeness and to identify patterns in response interval performance.

6.5 Training and Drills
All Utilities Division staff and applicable Public Works personnel are required to complete SSO response procedures training.

Training is based on the City's adopted OERP policies, including spill volume estimation methods and reporting procedures.

Spill response activities and procedures are reviewed during regularly scheduled staff meetings.

Contractors performing work on the CLMSD collection and conveyance system are provided with the Sewer Spill Response Instructions for Contractors and are required to ensure all on-site personnel are trained on spill response procedures prior to beginning work. A signed Contractor Compliance Agreement acknowledging receipt of spill response instructions and acceptance of notification requirements is retained in the project file.

Annual Drill Program
A formal schedule for annual overflow response drills has been established, consistent with the 2022–2025 audit corrective actions. The most recent full-staff OERP training was conducted in 2023 with attendance documented via sign-in sheets. A refresher training and full-scale drill are scheduled for mid 2026. Each drill is documented with: scenario description, participant list, and a written lessons-learned summary. Documentation is retained in Compliance Department records and used to inform training updates and procedure refinements.

6.6 Post-Spill Review and Continuous Improvement
Following each SSO event, an after-action review is conducted with all staff who participated in the spill response, as feasible.

The review covers: incident timeline, root cause, containment and cleanup effectiveness, regulatory notification compliance, and lessons learned. Findings are documented in a written after-action summary, which is filed with the original spill reporting documentation in the event-specific project file.

Recurring issues or systemic findings identified through after-action reviews are used to update training content, refine OERP field procedures, and inform maintenance and rehabilitation priorities. Significant findings are discussed with the Utilities Director and incorporated into the annual SSMP performance review under Element IX.

Continuous Improvement Integration
Enhanced response metrics and post-spill review data are incorporated into annual SSMP performance reviews and future triennial audits as evidence of continuous improvement and response efficiency, consistent with the 2022–2025 audit corrective actions. The SSO Tracking Spreadsheet, Post-Spill Review forms, and drill documentation together form the District's continuous improvement record for Element VI.

6.7 Hazardous Materials and Major Emergency Procedures
CLMSD maintains a Hazardous Materials Incident Response Plan (Appendix 6.B) that governs responses to emergencies involving chemical spills or uncontrolled releases. This plan applies to SSO events deemed major emergencies that threaten public health and may require evacuation and public notification. The plan is updated as required by state law, and copies are distributed to the Lake County Environmental Health Department and the Lakeport Fire District. 34 / 352
First responders for major emergencies include the Lakeport Police Department, Lake County Sheriff's Department, Lake County Office of Emergency Services, and the Lakeport Fire District. CLMSD staff are trained to limit their role during a declared major emergency to notification and evacuation only and are not to engage in other emergency response activities.

Copies of the plan are maintained at the surface water treatment plant, the Corporation Yard sewer office, and the wastewater treatment plant, and are available electronically on the city’s Safety SharePoint.

The City also maintains a general Emergency Operations Plan (EOP). The City Manager is responsible for implementing the EOP, managing overall City operations during a major emergency, and ensuring the plan is updated regularly and that staff receive adequate emergency operations training.
35 / 352
Element VII — Sewer Pipe Blockage Control Program
Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee shall evaluate its service area to determine whether a FOG control program is needed. If FOG is found to be a problem, the Enrollee must prepare and implement a FOG source control program including: (1) public education and outreach; (2) FOG disposal plan; (3) legal authority to prohibit discharges; (4) grease removal device requirements and design standards; (5) inspection and enforcement authority; (6) identification of FOG-prone system sections and cleaning schedule; and (7) source control measures for identified FOG sources.

Implementation Status — Non-Compliant, Active Corrective Actions Underway The 2022–2025 Triennial Audit found this element Non-Compliant. The legal authority framework is in place under LMC Chapter 13.20, but the FOG program has been largely inactive due to outdated materials and limited staff capacity.

Significant corrective actions have been completed or are actively underway. This element documents the program framework as rebuilt and identifies commitments for full implementation. Target: operational compliance by Q4 2026.

7.1 FOG Problem Identification
FOG is confirmed as a recurring problem in the CLMSD collection system. During the 2022–2025 audit period, FOG blockages accounted for 22% of all SSOs, the second-leading cause, behind root intrusion (33%). FOG-related blockages are concentrated in older clay pipe sections where grease accumulates on pipe walls, particularly in areas with a high density of food service establishments (FSEs). A FOG control program is therefore required and is being actively implemented.

A preliminary FSE inventory has been compiled for this revision. Twenty-eight food service establishments have been identified in the CLMSD service area at this time. The inventory is being cross-referenced against City business license and connection records and will serve as the foundation for the trigger-based inspection program described in Section 7.8. The FSE compliance tracking spreadsheet is maintained by the Compliance Officer and will be updated as data is collected.

The GIS-based SSO incident map (Appendix 7.D) identifies system sections subject to FOG-attributed spills. FOG-attributed SSOs are flagged in the SSO Tracking Spreadsheet, enabling trend analysis at the quarterly SSO program review. These locations are incorporated into the priority cleaning schedule described in Element IV and are the primary targets for FOG source control measures.

7.2 Legal Authority
CLMSD's legal authority for FOG program regulation and enforcement is established under Lakeport Municipal Code (LMC) Chapter 13.20, Sewer Use and Pretreatment Regulations, adopted pursuant to Ordinance No. 872 (2008). Key provisions include:
36 / 352
LMC Section Authority / Provision
§ 13.20.010 Establishes objectives of the FOG program, including compliance with state and federal environmental protection laws.
§ 13.20.600 et seq. FOG program regulations, including prohibition of untreated FOG discharge to the municipal sewer system.
§ 13.20.610 Requires grease traps and interceptors at all FSEs that produce FOG; establishes design and sizing requirements.
§ 13.20.610.B Requires grease traps/interceptors at facilities producing substances harmful to CLMSD.
§ 13.20.390–13.20.500 Enforcement provisions ranging from informal notices to administrative penalties, civil action, and criminal enforcement.
§ 13.20.650 FOG program variance process for case-by-case exemptions. § 13.20.660 et seq. Wastewater discharge permit requirements for commercial and industrial users.

Ordinance Update — In Progress
LMC Chapter 13.20 is under comprehensive revision as described in Element III. The FOG ordinance provisions (§ 13.20.600 et seq.) will be modernized as part of this revision to ensure they are legally defensible and support current programmatic improvements including updated interceptor sizing standards, enforcement penalty schedules, and inspection triggers. The revised ordinance is being developed in coordination with the City Attorney. A revision timeline will be established upon formal engagement with the City Attorney.

7.3 Grease Removal Device Requirements
LMC Section 13.20.610 requires all FSEs that generate or work with FOG to install and maintain grease traps or grease interceptors. Design, sizing, maintenance, and recordkeeping requirements are established in the ordinance and further detailed in the Grease Trap/Interceptor Inspection Policy (Appendix 7.B).

Interceptor sizing is determined using the California Plumbing Code Section 1014.2 formula. A grease interceptor sizing calculator has been developed and is used by the Compliance Officer and Building Official to verify that proposed interceptor sizes meet the minimum required capacity based on fixture count, drain time, and waste flow rate. This tool replaced an outdated informal sizing process and is now the standard for all new interceptor installations and permit applications.

FSEs are required to maintain a cleaning and service log for their grease traps and interceptors. These records must be made available for inspection by the Compliance Officer, Building Official, or Lake County Environmental Health staff upon request. Cleaning and hauling must be performed by a licensed grease hauler, and disposal receipts serve as the primary documentation of compliance.

7.4 Inspection and Enforcement Authority
CLMSD staff hold the authority to inspect all grease-producing facilities and enforce the FOG provisions of LMC Chapter

13.20. The Compliance Officer and Chief Building Official are the primary administrators of the FOG program. Qualified Utilities Division field staff are available to conduct inspections at the direction of the Compliance Officer or Utilities Director. 37 / 352
FOG Inspector Certification — Complete
The Compliance Officer has completed FOG Inspector Certification, providing in-house inspection and enforcement expertise. This certification enables the District to conduct formal FSE inspections independently, reducing reliance on County Environmental Health coordination for routine enforcement. Certificate is on file in the Compliance Officer's training records.

County Environmental Health MOU — In Progress
A Memorandum of Understanding (MOU) with the Lake County Environmental Health Department is being developed.

Under the MOU, FOG inspections will be triggered when an FSE cannot produce grease disposal receipts at their annual County health inspection. This creates a coordinated enforcement mechanism that leverages existing County inspection activity to identify non-compliant FSEs without requiring a separate CLMSD inspection scheduling system. MOU execution target: 2027

7.5 Public Education and Outreach
CLMSD has operated a public education and outreach program for the FOG program since 2008, targeting both FSEs and residential users. Educational materials have historically been distributed to all FSEs upon application for a City business license and have been made available on the City's website. The City also uses social media platforms to supplement FOG education with reminders about proper grease disposal practices.

The existing educational materials date to 2009 and are being replaced as part of this revision cycle. An updated bilingual (English/Spanish) FOG education package is being developed, consisting of: a plain-language FSE fact sheet describing interceptor requirements, cleaning frequency, and disposal documentation; a residential best practices flyer covering drywiping, proper disposal, and the impacts of FOG on the sewer system; and a permit counter handout summarizing the FOG program for new business applicants. Target completion and launch: Q4 2026. Distribution will occur through the City website, permit counter, utility billing inserts, and direct distribution to FSEs during inspections.

FOG Permit Application and Hauling Log — Updated
A revised FOG permit application and hauling log have been developed as part of this program rebuild. The updated application captures FSE contact information, interceptor specifications, sizing calculations, cleaning schedule, and hauler information. It is designed to serve as both a permit application and an ongoing compliance record, and is available at the permit counter and on the City website. FSEs may also submit hauling records electronically; an online submission portal is under consideration to streamline record collection.

7.6 FOG Disposal
LMC Section 13.20.600 et seq. prohibits the discharge of untreated FOG to the municipal sanitary sewer system. FSEs are required to use licensed grease haulers to service their traps and interceptors and remove collected FOG. Hauling receipts serve as the primary compliance documentation and must be retained and made available for inspection.

FSEs that produce nominal amounts of FOG may be permitted to allow collected grease to solidify and dispose of it in the regular solid waste stream. This exception is limited and is evaluated on a case-by-case basis through the variance process under LMC Section 13.20.650. CLMSD encourages all FSEs and residential users to exercise best management practices 38 / 352
(BMPs), including dry-wiping dishes and cookware before washing and collecting frying oils in sealed containers for proper disposal.

7.7 FOG Identification and Cleaning Schedule
System sections subject to FOG-attributed spills are identified through the GIS-based SSO incident map (Appendix 7.D), CCTV inspection findings, and field crew observations. These locations are incorporated into the priority cleaning schedule in OpenGov EAM, ensuring higher cleaning frequency in FOG-prone segments. The cleaning schedule is reviewed quarterly and updated based on new SSO events, inspection findings, and changes in FSE density or activity in affected areas.

FOG-attributed SSOs are flagged in the SSO incident map and in the SSO Tracking Spreadsheet, enabling trend analysis at the quarterly SSO program review. This data directly informs FSE outreach priorities and cleaning schedule adjustments under the trigger-based inspection program described in Section 7.8.

7.8 Inspection and Enforcement Program
CLMSD is establishing a trigger-based FOG inspection program consistent with the agency's staffing capacity and the requirements of Order WQ 2022-0103-DWQ. The program does not rely on a routine annual inspection schedule for all FSEs. Instead, inspections are initiated by specific triggers that identify FSEs with actual or probable compliance issues, concentrating enforcement resources where they are most needed.

Inspection Trigger Description
County Environmental Health
MOU referral
FSE unable to produce grease disposal receipts at annual Lake County health inspection is referred to CLMSD for follow-up. Primary enforcement mechanism pending MOU execution.

FOG-attributed SSO Any SSO with FOG identified as cause triggers inspection of FSEs in the upstream drainage area.

New FSE permit application All new FSEs applying for a business license or building permit are subject to interceptor review and sizing verification prior to connection.

Complaint referral Complaints from public, other City departments, or County Environmental Health regarding FOG discharge or interceptor maintenance.

Director determination Inspection required by the Utilities Director or Compliance Officer for the protection of public health, safety, or welfare per LMC Section 13.20.290.

Enforcement actions available under LMC Chapter 13.20 range from informal notices of violation and compliance schedules to administrative civil penalties, civil action, and criminal enforcement. Resolution No. 2315 (2008) (Appendix 3.B) prescribes the current fine schedule for FOG program violations; this resolution is under review for update as part of the broader LMC Chapter 13.20 revision.

FOG Program — Summary of Corrective Actions and Targets FOG Inspector Certification — Complete. Certificate on file in Compliance Department records.

Updated FSE permit application and hauling log — Complete. Available at permit counter and on City website.

I
I
I
I
39 / 352
Preliminary FSE inventory (28 FSEs identified) — Complete. Cross-reference with City records ongoing.

LMC Chapter 13.20 FOG ordinance revision — In Progress. Timeline to be established upon City Attorney engagement.

County Environmental Health MOU execution — In Progress. Target 2027.

Updated bilingual FOG education package launch — Target Q4 2026.

Trigger-based inspection program operational — Target Q4 2026. 40 / 352
Element VIII — System Evaluation and Capacity Assurance Plan Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee shall prepare and implement a Capital Improvement Plan that provides hydraulic capacity for dry weather peak flow conditions and appropriate design storm or wet weather events. The plan must include: (1) evaluation of system portions experiencing or contributing to SSOs caused by hydraulic deficiency; (2) establishment of design criteria where deficient or absent; (3) capacity enhancement measures including a short- and long-term CIP with prioritization, alternatives analysis, and funding sources; and (4) a schedule for CIP completion.

Implementation Status — Restored to Compliance
The 2022–2025 Triennial Audit found this element Non-Compliant due to reliance on the outdated 2008 Master Sewer Plan.

The 2025 Sewer Master Plan Update (PACE Engineering) was adopted by the CLMSD Board of Directors in February 2026.

This SSMP revision incorporates the 2025 SMPU as the District's current system evaluation and capacity planning foundation, restoring compliance with this element.

8.1 System Evaluation Foundation — 2025 Sewer Master Plan Update The 2025 Sewer Master Plan Update (PACE Engineering, adopted February 2026) serves as CLMSD's current system evaluation and capacity assurance document. It replaces the 2008 Master Sewer Plan and includes updated flow-monitoring data, hydraulic computer modeling, condition-assessment findings, and a prioritized Capital Improvement Plan. The 2025 SMPU is included in Appendix 8.A is the authoritative source for all hydraulic data, design criteria, and CIP projects referenced in this element.

8.2 System Capacity and Design Criteria
The 2025 SMPU evaluated system capacity under existing, 10-year, and 20-year flow conditions. Key capacity metrics are summarized below:

Parameter Value Source
WWTP design capacity (ADWF) 0.53 MGD 2025 SMPU
Current ADWF (2020–2024 avg.) 0.36 MGD (68% of capacity) 2025 SMPU Peak wet weather flow (PWWF) 2.31 MGD (Feb 2019 peak
event)
2025 SMPU
PWWF:ADWF ratio 6.4:1 (significantly exceeds 3:1
design threshold)
2025 SMPU
Pipeline locations identified for spot repair 53 locations 2025 SMPU CCTV assessment
Pipe replacement recommended 1,300 linear feet 2025 SMPU Pipe lining recommended 4,500 linear feet 2025 SMPU
41 / 352

8.3 Hydraulic Deficiency Evaluation
I&I remains the dominant driver of peak wet weather flows. The PWWF:ADWF ratio of 6.4:1 significantly exceeds the typical design ratio, indicating that I&I reduction is the highest-priority hydraulic improvement. The 2025 SMPU identified 53 pipeline locations for spot repairs, with 1,300 linear feet requiring replacement and 4,500 linear feet recommended for lining.

Approximately 2.13% of the system is not readily accessible for maintenance, representing an ongoing operational constraint. Lift station capacity is generally adequate for existing flows, with targeted improvements needed at specific stations as detailed in the 2025 SMPU.

8.4 Capital Improvement Plan
The 2025 SMPU establishes a prioritized Capital Improvement Plan organized into three implementation periods. All cost estimates are in July 2025 dollars and include a 30% construction contingency and 35% indirect cost allowance.

Period Collection System WWTP Total
Immediate Term 2025–2030 $13,300,000 $710,000 $14,010,000 Near Term 2030–2035 $4,472,000 $165,000 $4,637,000
Long Term 2035–2045 $6,600,000 $31,086,000 $37,686,000
Total $24,372,000 $31,961,000 $56,333,000
The CIP is integrated with the risk-based rehabilitation prioritization framework described in Element IV. Projects are ranked annually by likelihood x consequence and maintained in OpenGov EAM. CIP delivery status and capacity outcomes are tracked quarterly by the Utilities Director and Compliance Officer. Near and long-term project details are provided in the 2025 SMPU Table ES-1 (Appendix 8.A).

8.5 I&I Reduction Program
I&I reduction is the single highest-priority capacity enhancement measure identified in the 2025 SMPU. The recommended I&I reduction program targets the high-I&I areas identified in flow monitoring data. The estimated program cost is approximately $3.2 million, with a projected reduction of approximately 0.9 MGD of I&I from the system, meaningfully reducing the PWWF: ADWF ratio and extending the useful life of existing collection system capacity. The City intends to continue wet-weather flow monitoring to verify I&I allowance estimates and refine rehabilitation priorities as new data become available.

8.6 Funding Strategy
The 2025 SMPU identifies the following primary funding sources for CIP implementation: Clean Water State Revolving Fund (CWSRF), Lakeport qualifies as a severely disadvantaged community, making it eligible for up to 100% grant funding for projects addressing a violation or septic-to-sewer components; Community Development Block Grants (CDBG); and City general fund and sewer enterprise fund revenues. The CIP is reviewed annually as part of the City budget process and updated to reflect project completions, new findings, and changes in grant funding availability.

I
I
l
l
42 / 352
The 2025 SMPU will be re-evaluated within 10 years, consistent with the recommendation in the plan. The next SMPU update is estimated for approximately 2035, or earlier if system conditions or growth rates change materially. Findings from this update will be incorporated into the subsequent SSMP revision. 43 / 352
Element IX — Monitoring, Measurement, and Program Modifications Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee shall: (1) maintain relevant information to establish and prioritize SSMP activities; (2) monitor the implementation and effectiveness of each SSMP element; (3) assess the success of the preventive maintenance program; (4) update program elements based on monitoring or performance evaluations; and (5) identify and illustrate SSO trends including frequency, location, and volume.

Implementation Status — Non-Compliant, Active Corrective Actions Underway The 2022–2025 Triennial Audit found this element Non-Compliant due to a stale SSO trends table (data only through 2017) and absence of a formalized performance review cycle. Significant corrective actions have been completed: the SSO Tracking Spreadsheet (2025 Edition) has been built and populated with historical data, and a quarterly review cadence has been established. Full integration of performance data into SSMP decision-making is ongoing. Target: full compliance Q3 2026.

9.1 Data Collection and Maintenance Records
CLMSD uses EAM as its electronic asset and operations management system. All preventive maintenance activities, corrective maintenance work orders, CCTV inspection findings, and lift station PM records are tracked in EAM. This system provides the data needed to prioritize activities and evaluate the effectiveness of the preventive maintenance program.

Maintenance records are reviewed by the Utilities Superintendent and field supervisors regularly to refine scheduling and identify emerging problem areas.

The GIS-based SSO incident map (Appendix 7.D) provides a spatial record of all SSO events, including location, cause, volume, and recovery status. The map is updated following each spill event and is used in conjunction with the SSO Tracking Spreadsheet and OpenGov EAM data to identify patterns and inform program adjustments.

9.2 SSO Tracking Spreadsheet
The SSO Tracking Spreadsheet (2025 Edition) is the District's primary tool for collecting, organizing, and analyzing SSO performance data. It captures date, time, location, estimated volume, cause code, recovery status, response timestamps, CIWQS report number, and post-spill review notes for every SSO event. Historical data has been backfilled from 2018 to the present as a corrective action from the 2022–2025 audit. The spreadsheet is the foundation for all SSO trend analysis and KPI reporting described in this element.

9.3 Quarterly Performance Review
The Compliance Officer conducts a quarterly performance review using data from OpenGov EAM, the SSO Tracking Spreadsheet, and program records. The review is documented in a one-page summary filed in the Compliance Department records. The following items are reviewed each quarter:
44 / 352
Item Data Source
Number of SSOs since last review; volume; cause
codes; recovery status
SSO Tracking Spreadsheet; CIWQS
Any SSO reaching surface water — note immediately
in review record
CIWQS spill category; response logs
Gravity main cleaning completed — footage logged,
issues noted by crew
EAM work orders
Lift station PM work orders — completed on schedule
or overdue
EAM PM records
CCTV findings since last review — any new condition
issues noted
EAM inspection records
Open corrective maintenance work orders — any
significantly overdue
EAM work order queue
FOG disposal records received — any FSEs with
documented gaps
FSE compliance tracking spreadsheet
New FSE connections or land use changes flagged
by Building Official
Permit counter log
SSMP Change Log — any changes since last review
documented
Change Log (Appendix 10.D)
Annual add-ons (completed once per year, tagged to Q1 or Q2 review): KPI summary, SSO rate, I&I ratio if flow data available, cleaning footage vs. plan; CIP progress check against 2025 SMPU Table ES-1 project schedule; training records current for all field staff; OERP annual drill conducted and documented.

9.4 SSO Trend Analysis
SSO trend data is compiled annually from the SSO Tracking Spreadsheet and presented in the annual performance summary. Trends are evaluated for: total SSOs per year, SSO volume, cause code distribution (roots, FOG, debris, pump station, other), Category 1 events reaching surface water, and response time intervals. Trend findings directly inform PM program adjustments, FOG inspection priorities, CIP project sequencing, and OERP procedure updates as described in Element I Section 1.4.

9.5 Annual Performance Summary and Program Modifications Each calendar year, the Compliance Officer prepares an annual performance summary compiling KPI results, SSO trend data, and a review of each SSMP element's implementation status. The summary is presented to the Utilities Director and, where significant findings warrant, to the CLMSD Board of Directors. The annual review is the primary input to the triennial SSMP audit and ensures the SSMP remains a living document that accurately reflects current program conditions. 45 / 352

9.6 SSMP Change Log and Document Control
All revisions to the SSMP are recorded in the SSMP Change Log (Appendix 10.D). The log captures: date of change, element affected, description of the change, basis or trigger, and the name of the staff member making the change. Minor changes are approved by the Utilities Director. Significant changes are presented to the CLMSD Board of Directors for review. The Compliance Officer is primarily responsible for maintaining the Change Log. The Change Log is reviewed at each quarterly performance review to confirm completeness.

9.7 Using Performance Data to Drive Program Decisions
SSO trend data, maintenance records, KPI results, and post-spill review findings are actively used to inform decisions across all SSMP elements. The table below summarizes how performance data feeds into program adjustments:

Data Source Informs SSMP Element
SSO cause trends Priority cleaning list updates; FOG
inspection priorities
Elements IV and VII
KPI dashboard — I&I ratio, SSO
rate
CIP watchlist prioritization;
rehabilitation scheduling
Elements IV and VIII
Post-spill review — response
time metrics
OERP procedure updates; training
content
Element VI
CCTV and manhole inspection
findings
Risk-based rehab ranking; CIP
project selection
Elements IV and VIII
FOG-attributed SSO trends FSE inspection priorities; priority cleaning frequency
Elements IV and VII
Training records and
certifications
Training matrix updates; drill
scheduling
Elements IV and VI
I
I
I
I
I
I
46 / 352
Element X — Program Audits
Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee shall conduct periodic internal audits appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur every three years and a written report must be prepared and kept on file. The audit shall evaluate the effectiveness of the SSMP, assess the Enrollee's compliance with the General Order requirements, and identify any program deficiencies and steps to correct them.

Implementation Status — Restored to Compliance
The 2022–2025 Triennial Audit found this element Non-Compliant due to the absence of prior audit records on file. The 2022–2025 SSMP Audit Report (prepared October 2025, approved by Utilities Director Paul Harris) re-establishes compliance and provides the foundation for all future audit cycles.

10.1 Audit Program Overview
CLMSD conducts triennial internal audits of the SSMP consistent with Order WQ 2022-0103-DWQ. Each audit evaluates:
the effectiveness of the SSMP in preventing SSOs; compliance with the General Order requirements for each element; and program deficiencies and corrective actions needed. Audit findings are documented in a written report, approved by the Utilities Director, filed with the SSMP, and incorporated into the subsequent SSMP revision.

Operator input is solicited during each audit cycle consistent with Order WQ 2022-0103-DWQ requirements. Field staff, supervisors, and management are given the opportunity to review audit findings and provide input on corrective actions prior to the final report. Documentation of operator participation is retained in the Compliance Department records.

10.2 Current Audit — 2022–2025 Triennial Audit
The 2022–2025 Triennial SSMP Audit was conducted by the Compliance Officer and completed in October 2025. The audit evaluated SSMP compliance for the period May 2022 through May 2025 and identified corrective actions across multiple elements. The audit report was approved by Utilities Director Paul Harris and is on file in the Compliance Department records. All corrective actions identified in the audit are addressed in this SSMP Revision 5.

10.3 Corrective Action Tracking
Corrective actions identified through the triennial audit are tracked in the Corrective Action Program (CAP) Log (Appendix

10.C). The CAP Log captures: audit finding, element affected, corrective action committed, responsible party, target date, and completion status. The log is reviewed at each quarterly performance review and updated as actions are completed.

Significant deviations from committed targets are documented and reported to the Utilities Director.

10.4 Future Audit Schedule
47 / 352
Cycle Due Date Notes
Triennial Audit 2022–
2025
October 2025 (Complete) This audit. Corrective actions integrated into SSMP Revision 5.

SSMP Update —
Revision 5
April 21, 2026 (CLMSD
Board Adoption)
May 2, 2026 (CIWQS
Certification)
This document. Incorporates 2022–2025 audit
findings and 2025 SMPU.

Triennial Audit 2025–
2028
November 2028 Next audit cycle. Will evaluate Revision 5 implementation and corrective action completion.

SSMP Update —
Revision 6
Est. 2032 Next six-year update. Will incorporate 2025–2028 audit findings.
48 / 352
Element XI — Communication Program
Regulatory Requirement — Order WQ 2022-0103-DWQ
The Enrollee shall communicate on a regular basis with the public on the development, implementation, and performance of its SSMP. The program shall provide the public the opportunity to provide input on the SSMP as it is developed and implemented. The Enrollee shall also create a plan for communicating with owners/operators of systems that connect into the Enrollee's system, including satellite systems, for system operation, maintenance, and capital improvement-related activities.

Implementation Status — Compliant with Deficiencies
The 2022–2025 Triennial Audit found active public communication channels in place but noted they were not described in the SSMP, and that no formal outreach calendar or public feedback intake process existed. This revision documents existing tools and commits to formalizing the outreach calendar and feedback process. Target: Q3 2026.

11.1 Public Communication Platforms
CLMSD communicates with the public about sewer system performance, SSMP content, and spill prevention through the following platforms:

Platform How It Supports SSMP Communication
City Website
(cityoflakeport.com)
Primary repository for SSMP documents, FOG program information, and regulatory notices. SSMP is posted following each revision. Updated by the Compliance Officer and IT Department.

Public Works Facebook Page Used for operational announcements including construction alerts, smoke testing notices, sewer outage notifications, and FOG/I&I educational reminders.

City Hall Facebook Page Supplements Public Works communications with broader city announcements including Board meeting notices and major infrastructure project updates.

Press Releases Issued for major infrastructure projects, regulatory milestones, and significant public notices including SSMP updates and smoke testing programs.

11.2 Public Input and Feedback
CLMSD communicates with the public on the development, implementation, and performance of the SSMP through its existing public-facing platforms, including the City website, the Public Works and City Hall Facebook pages, and press releases issued for major infrastructure projects and regulatory milestones. 49 / 352
SSMP updates are presented to the Board of Directors as action items on publicly noticed meeting agendas, consistent with California open meeting requirements. This process provides the formal opportunity for public input on SSMP content as it is developed and adopted.

The SSMP is posted on the City website following each adoption and is available for public inspection at the Utilities Department during normal business hours.

11.3 Satellite and Tributary System Communication
CLMSD maintains a mutual aid agreement with the Lake County Sanitation District (LACOSAN) as described in Element III. Under this agreement, inter-agency flow exchange occurs in both the northern and southern portions of the service area.

CLMSD communicates with LACOSAN on an as-needed basis regarding emergency operations, planned maintenance activities that may affect flows at shared connection points, and capital improvement projects with potential inter-agency impacts. A copy of the mutual aid agreement is included in Appendix 3.D.

11.4 Annual Outreach Calendar — In Development
A formal annual outreach calendar is being developed to ensure consistent public communication on sewer program topics throughout the year. The calendar will include scheduled outreach on: FOG best practices (distributed with utility bills); I&I awareness (timed to wet season preparation); smoke testing advance notice; SSMP update and public comment periods; and SSO response notification protocols for the public. Target completion: Q3 2026. 50 / 352
Appendices
The following appendices support the City of Lakeport Municipal Sewer District Sewer System Management Plan, Revision 5 (April 2026). Appendices are classified as either Attached (physical pages follow the cover sheet) or Reference (document maintained separately; cover sheet provides title, location, and availability).

Attached — Physical pages follow the appendix cover sheet and are part of this SSMP document. | Reference — Document is maintained separately. Cover sheet provides title, location, version, and/or URL or file path.

Appendix Table of Contents
Appendix Title Type Location / Notes

2.A Organizational Chart and Contact List Attached Follows cover sheet

2.B SSO Regulatory Reporting Requirements
Reference Guide
Attached Follows cover sheet

3.A Lakeport Municipal Code Chapter 13.20
— Sewer Use and Pretreatment
Reference [URL — confirm with IT before
finalization]

3.B Resolution No. 2315 (2008) — FOG
Program Fines and Penalties
Reference City Clerk records. Under revision
— replace with updated resolution
upon Council adoption.

3.C Utilities Department Policies U-3, U-4,
and U-6
Attached Follows cover sheet

3.D Mutual Aid Agreement with LACOSAN Reference On file, Utilities Department

4.A Collection System Map
Attached
Current version maintained in GIS
/ OpenGov EAM. Certificationdate snapshot on file.

4.B 2025 Sewer Master Plan Update —
PACE Engineering, February 2026
Reference On file, Utilities Department.

Council adoption February 2026.
5 Adopted Sewer System Design and
Construction Standards
Reference [URL — confirm with IT before
finalization]

6.A SSO Field Report Form and CIWQS Spill
Narrative Template
Attached Follows cover sheet

6.B Hazardous Materials Incident Response
Plan
Attached Follows cover sheet

6.C Sewer Emergency Response Plan
(SERP) — August 2023
Attached Follows cover sheet
51 / 352

7.A Grease Trap / Interceptor Inspection
Policy
Attached Follows cover sheet

7.B SSO / FOG Incident Map Reference Current version maintained in GIS. Certification-date snapshot
on file.

10.A SSMP Audit Template — 11-Element
Standard Format
Attached Follows cover sheet

10.B 2022–2025 SSMP Audit Report —
October 2025
Attached Follows cover sheet

10.C Element Status Summary — Revision 5
Corrective Action Program Log
Attached Placeholder — in development.

10.D SSMP Change Log Attached Follows cover sheet — living document, updated as changes
occur

I I I I

I I I I

I I I I
I I I
52 / 352
Appendix 2.A
Organizational Chart and Contact List
City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: ATTACHED
Document follows this cover sheet.
53 / 352
City of Lakeport Municipal Sewer DIstnct I SSMP RevIsIon 4 I April 2026 Appendix 2.A
Organizational Chart and Contact List
[email protected] • (707) 263-5615 x104
City Engineer Utilities Director
Paul Harris
Chief Building Official
Bethany Moss Childers
[email protected]
(707) 263-5615 x202
Reports to CDD Dtreclor
Paul Curren
[email protected]
(707) 263-5615 x407
[email protected]
(707) 263-3578 x402
■ CLMSD leadership
Compliance Officer
Jen Baker
[email protected]
(707) 263-3578 x403
l
Utilities Superintendent
Forrest Stogner
[email protected]
(707) 263-3578 x701
I
l
W/WW Treatment Supervisor Underground Supervisor
Mark Fetzer Dylan Teverbaugh
[email protected] [email protected] (707) 263-3578 x704 (707) 263-3578 x706
I I
Field Staff
Ut1lrt1es D1v1s1on field crews
SSMP / SSO authority 0 Operations / field 0 Community Development - - - • Coordination / not direct report
54 / 352
Appendix 2.B
SSO Regulatory Reporting Requirements Reference Guide
City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: ATTACHED
Document follows this cover sheet.
55 / 352
City of Lakeport Spill Emergency Response Plan
Regulatory Reporting Guide B-1: Page 1
The City's Leg_alty Responsible Officials {LROs} are authorized to electtonka11y sign and certify spil re-port:s in CJWQS. See contact information for LROs on page A-2.

Deadline
2-...-
awareness of spiI,I
Wldlin 1800...-Sof
awareness of spill
3 Business Days a-fief'
............. otspiD
15 Days after the spit
end date
Within 30 calendars
mys after the end af
the calendar month in
which the spiD occws
45 days after spill end
-·
By February 1 • after
ttieend of the
cala,dar yei!:J" in which
the spills occw.

Cat~ 1 Spill"
Within two (2) hows ofthe
city's knowledge of a
category 1 spil of 1.,000
galons « greater.
discharging or threatening
to discharge to waters of
the State, notifyca10 ES
and obtain a notification
control number.

COnduct wa'tff quality
sampling of the receiving
wa.:er within 18 hoursoi
initial knowledge of spil of
50,000 gallons or greater to
surface waters.

Submit Draft SpilJ Report in
the CIWQS database.

Submit c.ertffied Spill
Report within t.s calendar
days of the spill end da te.
tsubm.it Amended Spill
Report, as needed, within
90ca:lendar days after the
spill-end da te.)
Submit Technical Repott
within 4 5 calendar days
after the spiU end date for
a category 1 spill in which

50.,000 g_allons or greater
discharged to surface
wa:ers; and
Category 2 Spil,..

W'itlMn two (2) hours of
the City's lmowtedge of a
category 2 spill of 1,000
gallons or greats"
thrutffiing to discharg-e
to waters of the State,.
notifycalOES and obtain a
notification control
number.
submit oraft: Spill Re port in
the CIWQS database.
submit cenified spill
Report within 15 caJendar
days of the spill end date..
(submit Amended Spil
Repon,. as.needed, witbjn
90ailendar days after the
spill end date..)
see ++- note below.

Category 3 Spill"
SUbmit l'ftOnthly certified Spill
Report to the online CIWQS
Sanitary sewer System
Database
(Submit Amended Spill Report,
as needed. "A>--ithin90 catendar
.Jcry) .n...-. ~ e,.,.n ;r~ .spill
Repon due da te.}
A spil from a n EnroUe.e-owned and/ or operated lateral that discha rges to a surface water is a Cate.gory 1 spill ++ See following page for notes.

C 2004~2023 DKF Solutions Grot.41, LLC . AH rights reserved. Licensed 10 City of Lakeport for City use only. cat egoiy 4 Spill"'
cenify monthly_, the
estimated total spill
volume exiting the
sarutarv sev.~r system,
and the total number of
a l ca~ory 4 spills into
the online crwos
sanitary se.v.er system
Da tabase.

Upload and certify a
r epo,rt. in an accepu.ble
digital format, of all
category 4 spills to the
onr.,e c1w QS sanitary
sewer system
Da tabase.
7-27-23
56 / 352
Appendix 3.A
Lakeport Municipal Code Chapter 13.20 — Sewer Use and Pretreatment City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: REFERENCE — document not physically attached
Location: Lakeport Municipal Code Chapter 13.20
57 / 352
Appendix 3.B
Resolution No. 2315 (2008) — FOG Program Fines and Penalties City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: REFERENCE — document not physically attached
Location: Resolution No. 2315 (2008) - FOG Program Fines & Penalties — replace with updated resolution upon Council adoption.
58 / 352
Appendix 3.C
Utilities Department Policies U-3, U-4, and U-6
City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: ATTACHED – PLACEHOLDER
Document follows this cover sheet.
59 / 352
hƚŝůŝƚŝĞƐŝǀŝƐŝŽŶ
WŽůŝĐLJEŽ͗͘hͲϯ ^ĞǁĞƌ>ĂƚĞƌĂůĞƌƚŝĨŝĐĂƚŝŽŶ      WĂŐĞϭŽĨϯ /dzK&><
WKZd
hd/>/d/
^/s/^/KEWK>/z
^ƵďũĞĐƚ͗
^
t
Z>d
Z>
Zd/&/d/KEWZK'ZD
WŽůŝĐLJEƵŵďĞƌ͗
hͲϯ
ĂƚĞĚŽƉƚĞĚ͗
ϵͬϮϮͬϮϬϬϴ
ĂƚĞZĞǀŝƐĞĚ͗
ϭͬϮϰͬϭϴ
^ĐŽƉĞ͗ ƉƉůŝĞƐƚŽĂůůƉĞƌƐŽŶŶĞůƚŚĂƚĂƌĞƌĞƐƉŽŶƐŝďůĞĨŽƌĂĚŵŝŶŝƐƚĞƌŝŶŐƚŚĞ ƉĞƌŵŝƚƚŝŶŐĂŶĚͬŽƌŝŶƐƉĞĐƚŝŽŶŽĨƉƌŝǀĂƚĞƐĞǁĞƌůĂƚĞƌĂůƐĐŽŶŶĞĐƚĞĚƚŽƚŚĞ >D^ƐLJƐƚĞŵƚŚĂƚĂƌĞƌĞƉĂŝƌĞĚ͕ƌĞƉůĂĐĞĚŽƌƌĞůŝŶĞĚ͘
WƵƌƉŽƐĞ͗
ƐƚĂďůŝƐŚƚŚĞƌŽůĞƐĂŶĚƌĞƐƉŽŶƐŝďŝůŝƚŝĞƐŽĨŝƚLJƐƚĂĨĨƌĞŐĂƌĚŝŶŐƚŚĞŝƐƐƵĂŶĐĞŽĨ ^ĞǁĞƌ>ĂƚĞƌĂůĞƌƚŝĨŝĐĂƚĞƐŽĨŽŵƉůŝĂŶĐĞƌĞƋƵŝƌĞĚďLJƚŚĞ>ĂŬĞƉŽƌƚDƵŶŝĐŝƉĂů ŽĚĞ͘
ZĞƐƉŽŶƐŝďŝůŝƚLJ͗ dŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚĞƉĂƌƚŵĞŶƚƐŚĂůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌĞŶƐƵƌŝŶŐ ƚŚĞ^ĞǁĞƌ>ĂƚĞƌĂůĞƌƚŝĨŝĐĂƚĞŽĨŽŵƉůŝĂŶĐĞƉƌŽŐƌĂŵŝƐĂĚŚĞƌĞĚƚŽ͘ WƌŽŐƌĂŵƐƵĐĐĞƐƐŝƐĂůƐŽĚĞƉĞŶĚĞŶƚŽŶŽŶŐŽŝŶŐĐŽŵŵƵŶŝĐĂƚŝŽŶǁŝƚŚƚŚĞ ŝƚLJ͛ƐhƚŝůŝƚŝĞƐŝǀŝƐŝŽŶ͘
dŚĞŽŵƉůŝĂŶĐĞKĨĨŝĐĞƌ͕hƚŝůŝƚŝĞƐ^ƵƉĞƌŝŶƚĞŶĚĞŶƚĂŶĚͬŽƌŽŵŵƵŶŝƚLJ ĞǀĞůŽƉŵĞŶƚŝƌĞĐƚŽƌƐŚĂůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌĂŶLJĨƵƚƵƌĞƌĞǀŝƐŝŽŶƐƚŽƚŚŝƐ ƉŽůŝĐLJ͘
ZĞĨĞƌĞŶĐĞ͗ ŝƚLJŽĨ>ĂŬĞƉŽƌƚhƚŝůŝƚŝĞƐŝǀŝƐŝŽŶWŽůŝĐŝĞƐ͘zĂƌĚƐŚĂƌĞEĞƚǁŽƌŬůŽĐĂƚŝŽŶ͗ z͗ͰhƚŝůŝƚŝĞƐͰWŽůŝĐŝĞƐͰƵƌƌĞŶƚWŽůŝĐŝĞƐ

60 / 352
hƚŝůŝƚŝĞƐŝǀŝƐŝŽŶ
WŽůŝĐLJEŽ͗͘hͲϯ ^ĞǁĞƌ>ĂƚĞƌĂůĞƌƚŝĨŝĐĂƚŝŽŶ      WĂŐĞϮŽĨϯ <'ZKhE͗
ŝƚLJKƌĚŝŶĂŶĐĞEŽ͘ϴϳϮǁĂƐĂĚŽƉƚĞĚŝŶϮϬϬϴĂŶĚĞƐƚĂďůŝƐŚĞĚŵŝŶŝŵƵŵƐƚĂŶĚĂƌĚƐĨŽƌƉƌŝǀĂƚĞƐĞǁĞƌ ůĂƚĞƌĂů ƌĞƉĂŝƌĂŶĚ ƌĞƉůĂĐĞŵĞŶƚ͘dŚĞ ƌĞŐƵůĂƚŝŽŶƐǁĞƌĞĐŽĚŝĨŝĞĚŝŶŚĂƉƚĞƌϭϯ͘ϮϬ ;^ĞǁĞƌhƐĞĂŶĚ WƌĞƚƌĞĂƚŵĞŶƚͿŽĨƚŚĞ>ĂŬĞƉŽƌƚDƵŶŝĐŝƉĂůŽĚĞ;>DͿ͘
dŚĞŐŽĂůŽĨƚŚĞƌĞŐƵůĂƚŝŽŶƐŝƐƚŽĞŶƐƵƌĞƚŚĞŝƚLJ͛ƐƐĂŶŝƚĂƌLJƐĞǁĞƌƐLJƐƚĞŵŝƐĂĚĞƋƵĂƚĞůLJŵĂŝŶƚĂŝŶĞĚ͕ ŝŶĐůƵĚŝŶŐƉƌŽŐƌĂŵƐĚĞƐŝŐŶĞĚƚŽƌĞĚƵĐĞƚŚĞŝŶĨůŽǁĂŶĚŝŶĨŝůƚƌĂƚŝŽŶŽĨŐƌŽƵŶĚǁĂƚĞƌĂŶĚƐƚŽƌŵǁĂƚĞƌ ŝŶƚŽƚŚĞŝƚLJ͛ƐƐĞǁĞƌͬǁĂƐƚĞǁĂƚĞƌĨůŽǁƐ͘
dŚŝƐƉŽůŝĐLJŝƐǁƌŝƚƚĞŶƚŽĂĐĐŽŵƉůŝƐŚƚŚĞĨŽůůŽǁŝŶŐ͗
ϭ͘
ƐƚĂďůŝƐŚƌŽůĞƐĂŶĚƌĞƐƉŽŶƐŝďŝůŝƚŝĞƐĨŽƌƚŚĞĂĚŵŝŶŝƐƚƌĂƚŝŽŶŽĨƚŚĞ^ĞǁĞƌ>ĂƚĞƌĂůĞƌƚŝĨŝĐĂƚŝŽŶ WƌŽŐƌĂŵ;͞WƌŽŐƌĂŵ͟Ϳ͘
Ϯ͘ WƌŽǀŝĚĞŐƵŝĚĞůŝŶĞƐĨŽƌƚŚĞĞĨĨĞĐƚŝǀĞĂĚŵŝŶŝƐƚƌĂƚŝŽŶŽĨWƌŽŐƌĂŵĐĞƌƚŝĨŝĐĂƚĞƐĂŶĚƚŚĞĐůĞĂŶŝŶŐ͕ ŝŶƐƉĞĐƚŝŽŶ͕ĂŶĚƚĞƐƚŝŶŐŽĨƉƌŝǀĂƚĞƐĞǁĞƌůĂƚĞƌĂůƐ͘
WK>/z͗
ϭ͘ dŚĞ ƵŝůĚŝŶŐ KĨĨŝĐŝĂů Žƌ ĚĞƐŝŐŶĞĞ ŝƐ ƌĞƐƉŽŶƐŝďůĞ ĨŽƌ ĂĚŵŝŶŝƐƚĞƌŝŶŐ ƚŚĞ ^ĞǁĞƌ >ĂƚĞƌĂů ĞƌƚŝĨŝĐĂƚŝŽŶWƌŽŐƌĂŵĨŽƌƉƌŝǀĂƚĞůLJŽǁŶĞĚƉŽƌƚŝŽŶƐŽĨƐĞǁĞƌůĂƚĞƌĂůƐƚŚĂƚĂƌĞĐŽŶŶĞĐƚĞĚƚŽ ƚŚĞ>D^ƐĂŶŝƚĂƌLJƐĞǁĞƌĐŽůůĞĐƚŝŽŶƐLJƐƚĞŵ͘
Ϯ͘ ŶLJ ďƵŝůĚŝŶŐ Žƌ ƉůƵŵďŝŶŐ ƉĞƌŵŝƚ ĂƉƉůŝĐĂƚŝŽŶ ĨŽƌ Ă ƌĞŵŽĚĞů ŽĨ͕ Žƌ ŝŵƉƌŽǀĞŵĞŶƚ ƚŽ͕ Ă ƐƚƌƵĐƚƵƌĞďĞŝŶŐƐĞƌǀĞĚďLJĂƉƌŝǀĂƚĞƐĞǁĞƌůĂƚĞƌĂů;ƐͿŝŶĞdžĐĞƐƐŽĨΨϱϳ͕ϰϰϲŽƌŽƚŚĞƌŝŶĨůĂƚŝŽŶͲ ĂĚũƵƐƚĞĚĂŵŽƵŶƚĂƐĚĞƚĞƌŵŝŶĞĚďLJƚŚĞŝƚLJ͕ǁŚŝĐŚĞǀĞƌŝƐŐƌĞĂƚĞƌ͖ĂŶLJĐŚĂŶŐĞŽĨƵƐĞŽĨĂ ƉƌŽƉĞƌƚLJ͖ŽƌĂŶLJŽƚŚĞƌ͞ƉƌŽƉĞƌƚLJĞǀĞŶƚƐ͟ƐƚŝƉƵůĂƚĞĚŝŶ>D^ĞĐƚŝŽŶϭϯ͘ϮϬ͘ϯϮϬ&͘ϭƐŚĂůůďĞ ƐƵďũĞĐƚƚŽĐůĞĂŶŝŶŐ͕ŝŶƐƉĞĐƚŝŽŶ͕ĂŶĚƚĞƐƚŝŶŐŽĨƚŚĞƉƌŝǀĂƚĞƐĞǁĞƌůĂƚĞƌĂů;ƐͿĂŶĚƚŚĞŝƐƐƵĂŶĐĞ ŽĨĂ^ĞǁĞƌ>ĂƚĞƌĂůĞƌƚŝĨŝĐĂƚĞ͘
ϯ͘ dŚĞƵŝůĚŝŶŐKĨĨŝĐŝĂůŽƌhƚŝůŝƚŝĞƐ^ƵƉĞƌŝŶƚĞŶĚĞŶƚŵĂLJƌĞƋƵŝƌĞƚŚĞĐůĞĂŶŝŶŐ͕ŝŶƐƉĞĐƚŝŽŶ͕ĂŶĚ ƚĞƐƚŝŶŐŽĨĂƉƌŝǀĂƚĞƐĞǁĞƌůĂƚĞƌĂůŝĨƐƵĐŚĂĐƚŝŽŶŝƐĚĞĞŵĞĚďLJƚŚĂƚŝŶĚŝǀŝĚƵĂůƚŽďĞĨŽƌƚŚĞ ƉƌŽƚĞĐƚŝŽŶŽĨƚŚĞƉƵďůŝĐŚĞĂůƚŚ͕ƐĂĨĞƚLJ͕ŽƌǁĞůĨĂƌĞ͘
ϰ͘ WƌŝǀĂƚĞƐĞǁĞƌůĂƚĞƌĂůƐƚŚĂƚĂƌĞĨŽƵŶĚƚŽďĞŝŶŶĞĞĚŽĨƌĞƉĂŝƌŽƌƌĞƉůĂĐĞŵĞŶƚďLJƚŚĞŝƚLJŵƵƐƚ ďĞĐƵƌĞĚďĞĨŽƌĞĂďƵŝůĚŝŶŐŽƌƉůƵŵďŝŶŐƉĞƌŵŝƚĨŽƌƚŚĞƉƌŽƉĞƌƚLJŽǁŶĞƌ;͞hƐĞƌ͟ͿĞdžƉŝƌĞƐ͘ ϱ͘ dŚĞƵŝůĚŝŶŐKĨĨŝĐŝĂůŽƌhƚŝůŝƚŝĞƐ^ƵƉĞƌŝŶƚĞŶĚĞŶƚŵĂLJŐƌĂŶƚĂŶĞdžĞŵƉƚŝŽŶƚŽƚŚĞƚĞƐƚŝŶŐĂŶĚ ŝŶƐƉĞĐƚŝŽŶƉƌŽǀŝƐŝŽŶƐŽĨƚŚĞKƌĚŝŶĂŶĐĞ͕ƉƵƌƐƵĂŶƚƚŽ>D^ĞĐƚŝŽŶϭϯ͘ϮϬ͘ϯϮϬ&͘ϰ͘ ϲ͘ ZĞƐŝĚĞŶƚŝĂů ƉƌŝǀĂƚĞ ƐĞǁĞƌ ůĂƚĞƌĂůƐ ƚŚĂƚ ĨĂŝů ŝŶƐƉĞĐƚŝŽŶ ĂŶĚ ƚĞƐƚŝŶŐ ŵƵƐƚ ďĞ ƌĞƉĂŝƌĞĚ Žƌ ƌĞƉůĂĐĞĚďLJƚŚĞhƐĞƌǁŝƚŚŝŶϭϴϬĚĂLJƐŽĨŶŽƚŝĐĞ͘EŽŶƌĞƐŝĚĞŶƚŝĂůƉƌŝǀĂƚĞƐĞǁĞƌůĂƚĞƌĂůƐ;ŝ͘Ğ͘ ĐŽŵŵĞƌĐŝĂů͕ŝŶĚƵƐƚƌŝĂů͕ĞƚĐ͘ͿŵƵƐƚďĞƌĞƉĂŝƌĞĚŽƌƌĞƉůĂĐĞĚǁŝƚŚŝŶƐŝdžƚLJ;ϲϬͿĚĂLJƐŽĨŶŽƚŝĐĞŽƌ ƐŽŽŶĞƌ͕ŝĨĚĞƚĞƌŵŝŶĞĚŶĞĐĞƐƐĂƌLJďLJƚŚĞƵŝůĚŝŶŐKĨĨŝĐŝĂůŽƌhƚŝůŝƚŝĞƐ^ƵƉĞƌŝŶƚĞŶĚĞŶƚ͘ ϳ͘ dŚĞ ƵŝůĚŝŶŐ KĨĨŝĐŝĂů ƐŚĂůů ŶŽƚ ĐŽŵŵŝƐƐŝŽŶ ŝŶƐƉĞĐƚŝŽŶ ĂŶĚͬŽƌ ƚĞƐƚŝŶŐ ŽŶ Ă ƉƌŝǀĂƚĞ ƐĞǁĞƌ ůĂƚĞƌĂůǁŝƚŚŽƵƚƌĞĐĞŝƉƚŽĨƚŚĞĐƵƌƌĞŶƚŝŶƐƉĞĐƚŝŽŶĂŶĚƚĞƐƚŝŶŐĨĞĞďLJƚŚĞhƐĞƌ͘/ŶƐƉĞĐƚŝŽŶƐ ĂŶĚƚĞƐƚƐƉĞƌĨŽƌŵĞĚĂƐĂƌĞƐƵůƚŽĨ͞ƉƌŽƉĞƌƚLJĞǀĞŶƚƐ͟ŶŽƚĚĞƐĐƌŝďĞĚŝŶ>D^ĞĐƚŝŽŶϭϯ͘ϮϬ͘ϯϮϬ &͘ϭĂƌĞĞdžĞŵƉƚĨƌŽŵƚŚĞĨĞĞ͘
ϴ͘ ŶLJhƐĞƌŵĂLJĂƐŬƚŚĞĞƉĂƌƚŵĞŶƚƚŽŚĂǀĞƚŚĞŝƌƉƌŝǀĂƚĞůĂƚĞƌĂůƚŽďĞŝŶƐƉĞĐƚĞĚĂŶĚƚĞƐƚĞĚ ďLJƚŚĞŝƚLJ͘^ƵĐŚŝŶƐƉĞĐƚŝŽŶƐƐŚĂůůďĞĐŽŽƌĚŝŶĂƚĞĚǁŝƚŚƚŚĞhƚŝůŝƚŝĞƐŝǀŝƐŝŽŶĂŶĚĐŽŵƉůĞƚĞĚ ǁŝƚŚŝŶƚŚŝƌƚLJ;ϯϬͿĚĂLJƐĨƌŽŵƌĞĐĞŝƉƚŽĨƚŚĞŝŶƐƉĞĐƚŝŽŶĂŶĚƚĞƐƚŝŶŐĨĞĞ͘ 61 / 352
PROCEDURE:

1. In addition to any o her required fees, a Sewer La eral Testing P rmi fee will be ollected from applicants submitting a building or lu bing permit application.

2. The perhl,il fee shall also be collected at the time an application is received for a new connection to he sewer system or to recognize a change in the u e of a property.

3. Upon receipt of a building or plumbing permit application triggering the need for a Sewer La eral Certificate, the- Buildlng Official hall no ify he Utilities Division and shall commission an inspection of the associated private sewer lateral(s) or grant an exemption.

4. Pursuant to LMC Section 13.20.320 F., private sewer laterals that p • ss inspection and tes ing .shall be certified for ten (10) years or twenty-five (25) years by the City. The City .shall execute a Sewer Lateral Certificate of Compliance to the User and file a copy with he Communj y Development Department and the Utilities Division, and recorded with the Lake County Recorder.

5. The Building Official or de lgnee shall not;ify the property owner of the results of the s wer lateral in pection.

6. The Community Development Department shall retain a copy of the completed Inspection and Testing Report Form, attached hereto as Attachment A.

Policy reviewed and approved by:
4J
Paul Harris
Utilities Superintendent
Date

ATTACHMENT A
UTILITIES DIVISION POLICY U-3

SEWER LATERAL CERT/FICA TION PROGRAM
Inspection and Testing Report Form
MS Word Document: Double-dick the area below o open .PDF file.

Policy U-3,
.Attachmen A 12.20
.PDF File/hard copy: Attochmen A will be attached on following pages.

Utilities Division
Policy No.: U-3 Sewer Lateral Cer incalion Page 3 of 3
62 / 352
Utilities Division
Policy No.: U-4 FOG Program Variances Page 1 of 4

CITY OF LAKEPORT

UTILITIES DIVISION POLICY
Subject:

FOG PROGRAM: VARIANCES
Policy Number:

U-4
Date Adopted:
9/22/2008
Date Revised:
1/25/18
Scope: Applies to all personnel that are responsible for administering the provisions of the City’s Fats, Oils and Grease (FOG) Program (LMC Sections

13.20.600 et seq.).

Purpose: Establish guidelines and procedures to be followed during the processing and review of requests for Variances of the FOG requirements set forth in the Lakeport Municipal Code.

Responsibility: The Utilities Division shall be primarily responsible for the review and final determination of requests for Variances of the FOG requirements. Initial Variance application and fee intake and review will likely be the responsibility of the Community Development Department due to preexisting contact with Food Service Establishments.

The Compliance Officer, Utilities Superintendent and/or Community Development Director shall be responsible for any future revisions to this policy.

Reference: City of Lakeport Utilities Division Policies. Yardshare Network location:

Y:\Utilities\Policies\Current Policies
63 / 352
Utilities Division
Policy No.: U-4 FOG Program Variances Page 2 of 4
BACKGROUND:

Lakeport Municipal Code (LMC) Section 13.20.610 requires all food service establishments (“FSEs”) within the City of Lakeport Municipal Sewer District to take measures to prevent the discharge of materials that can inhibit the function of, or cause damage to, the sanitary sewer system. Such measures include the installation and maintenance of a grease interceptor to prevent the discharge of fats, oil and grease into the sanitary sewer system. These requirements are components of the City’s FOG Program.

FSE owners or authorized representatives (“Users”) may submit a Variance for Cause request to the City if they feel their situation warrants exception to the requirements. Full details regarding the FOG variance process (applications, review, approval/denial, revocation, appeals, etc.) are set forth in LMC Section 13.20.650.

This policy is written to accomplish the following:

1. Establish guidelines for the review and judgment of a Variance for Cause to vary from the requirements LMC Section 13.20.610; and

2. Establish guidelines for the review and judgment of a Variance for Cause request for grease interceptor installation as set forth in LMC Section 13.20.650

3. Establish procedures which the Department and the public should follow when requesting a variance.

POLICY:

1. The Utilities Superintendent (“Superintendent”), or his/her designee, shall make judgment on any Variance Study, resulting from a Variance for Cause request by an entity subject to the Fog Program.

2. The Superintendent may approve or deny a Variance for Cause request at his/her discretion.

3. The Superintendent or designee shall be available by appointment to speak with any affected User about issues related to the FOG Program.

4. From date of approval of a Variance for Cause request, and receipt of the $500.00 Variance Study fee, the City shall make every reasonable effort to complete a Variance Study and make a judgment on the necessity or feasibility of complying with any part of LMC Section 13.20.610 within ninety (90) days.

5. A Variance Study may be terminated at any time if it is determined that continuation of the Study adversely affects the sanitary sewer collection system or treatment works (LMC Section 13.20.650 A. 2.).

6. Per District Resolution No. 2316 (2008), the $500.00 Variance Study fee is non-refundable.

7. Unless sufficient evidence can be found that the FOG Program requirements create an unreasonable hardship, the Superintendent may deny a Variance for Cause request at his discretion.

8. The Superintendent or designee is responsible to commission and complete variance studies.

9. The Superintendent or designee may approve any variance at his/her discretion based on the results of the Variance Study.
64 / 352
Utilities Division
Policy No.: U-4 FOG Program Variances Page 3 of 4

10. Users requesting a variance from the FOG Program must submit a Variance for Cause Request Form within six (6) months of receipt of notice to install a grease interceptor. If a variance is not granted by the Superintendent or his/her designee, the FSE shall have six (6) months from the date of the variance denial notice to comply with the FOG requirements.

11. Users may petition the Superintendent, or his/her designee, to reconsider a decision by the Compliance Officer to deny a variance, if submitted in writing within thirty (30) days of the notice of variance denial.

12. The Superintendent, or his designee, may deny a petition to reconsider a variance decision by not acting on the petition (LMC Section 13.20.650 D. 4.).

13. Granted variances are effective in perpetuity from the date granted by the Superintendent or his/her designee.

14. Any granted variance may be revoked by the Utilities Superintendent at the recommendation of the Compliance Officer, based on one or more of the criteria detailed in LMC Section 13.20.650 C.

PROCEDURE:

1. Variance for Cause requests must be submitted to the City in writing using the Variance for Cause Request Form, attached hereto as Attachment A. The form shall be made available at the Community Development Department at City Hall.

2. Upon receipt of a Variance for Cause Request Form, it shall be date-stamped immediately, entered into the appropriate tracking software application, and submitted to the Utilities Superintendent for review. The Superintendent, or designee, shall have thirty (30) days from receipt of the Form to approve or deny the request.

3. Following approval or denial of a Variance for Cause request, the requesting party shall be notified of the decision in writing by the Utilities Division. If the request is approved, a Consent to a Variance Study Form, attached hereto as Attachment B, will be included with the notice. It must be signed and returned to the Superintendent by the User with the $500.00 Variance Study fee before the Study is commissioned. If the request is denied, an explanation must be included in the notice.

4. Per District Resolution No. 2316 (2008), a fee of $500.00 must be collected from the User before a Variance Study is commissioned.

5. Upon receipt by the Utilities Division of a Consent to a Variance Study Form, and the $500.00 Variance Study fee, it shall be date-stamped immediately and submitted to the Utilities Superintendent for review. The Superintendent or designee shall commission the study, assign a study number, and is responsible for its completion.

6. A Variance Study shall consist of the completion of a Variance Study Report Form, attached hereto as Attachment C. The Report requires comments from the Compliance Officer, City Building Inspector, and a County Health Inspector or representative from the Lake County Environmental Health Department. Additional comments may be required at the discretion of the Superintendent. Unless justified, a granted variance will require the approval of the Utilities Superintendent, City Building Inspector, and County Environmental Health official.
65 / 352

7. In the event that the Utilities Superintenden , Building nspector, or County Environmenta Health official is unable o complete their component of a V rlance S udy, he Superintendent may waive that component or assign itto another reviewer for comment.

8. The Utili ies Superint nden shall be responsible for conducting Variance Studies and passing Judgment no later than sixty (60) days after he Department receive he Con ent to a Varia . ce Study Form and $500.00 Variance Study Fee.

9. Variance Studies submit ed o the Superin endent, or his designee, for revlew .may include a staff report detailing the background and condition of the case in question ..

10. The U Uities Superln endent, or hls/her designee, shall make judgment on a Variance for Cause requ st no later than thirty (30) days from receipt of a fully completed Varlance Study.

11. A notice shall be sent to he User from the Utilities Division Indicating the decision whether to grant or deny a variance, the results of the variance study; and the reasons why a variance was granted or denied.

12. If denied a variance, a User may pe ition the Superintendent1 or his deslgnee, o reconsider the variance decisfon. A "Petition for Reconsideration of Determina ion or Enforcement Action" form, attached hereto as Attachmen D, must be submitted to the Utilities Division within thirty (30) days of the: notice of variance denjal. The Form should be date-stamped immedia ely, entered into the appropriate tracking software application, and submitted to the Superintendent for review.

Policy reviewed and approved by:

Paul Harris
Utilities Superintenden
Date I /2. /; g '
ATTACHMENTS A through D
UTILITIES DIVISION POLICY U-4
FOG Program Variances
MS Word Document: Doub.le-click the area below to open .PDF file.

Policy U-4, ALL ,
:JTACHMEN'TS 2.017 ,
.PDF File: Attachments A through D will be attached on foJlowing pages.

Utilities Division
Policy No.: U·4 FOG Program Variance Page 4 of
66 / 352
Utilities Division
Policy No.: U-6 Sewer Usage: Notices, Penalties, etc. Page 1 of 4

CITY OF LAKEPORT

UTILITIES DIVISION POLICY
Subject:

SEWER USAGE: NOTICES, PENALTIES, FINES

AND FEES
Policy Number:

U-6
Date Adopted:
3/15/2010
Date Revised:
1/25/2018
Scope: Applies to all personnel that are responsible for administering and enforcing the provisions of Lakeport Municipal Code (LMC) Chapter 13.20 (Sewer Use and Pretreatment).

Purpose: Establish guidelines and procedures for the imposition of enforcement actions related to LMC Chapter 13.20.

Establish the roles and responsibilities of City staff involved in enforcement actions.

Responsibility: The Utilities Division shall be primarily responsible coordinating enforcement actions associated with violations of LMC Chapter 13.20.

The Compliance Officer and/or Utilities Superintendent shall be responsible for any future revisions to this policy.

Reference: City of Lakeport Utilities Division Policies. Yardshare Network location:

Y:\Utilities\Policies\Current Policies
67 / 352
Utilities Division
Policy No.: U-6 Sewer Usage: Notices, Penalties, etc. Page 2 of 4 BACKGROUND:

City Ordinance No. 872 was adopted in 2008 and established a variety of regulations associated with the use of the City’s sanitary sewer system. The regulations were codified in Chapter 13.20 (Sewer Use and Pretreatment) of the Lakeport Municipal Code (LMC).

The goal of the regulations is to ensure the City’s sanitary sewer system is adequately maintained, including enforcement programs designed to correct and penalize system Users who do not comply with the adopted provisions. This policy is written to accomplish the following:

1. Establish guidelines and procedures for the imposition of enforcement actions related to LMC Chapter 13.20.

2. Establish the roles and responsibilities of City staff involved in enforcement actions.

POLICY:

1. All penalties, fines, and fees imposed on any User are due and payable upon receipt of written notice by the City. Such amounts will be delinquent thirty (30) days after the date of the notice (LMC 13.20.560 A.).

2. Fines related to the City’s FOG Program shall be in accordance with the current applicable City Council Fee Resolution, attached hereto as Attachment A.

3. The Utilities Superintendent shall be responsible for the imposition of notices, penalties, fines, and fees in accordance with LMC Chapter 13.20.

4. In response to identified violations of LMC Chapter 13.20 by any User, the enforcement mechanisms available to the Utilities Superintendent shall typically be applied in the following order:
a. Informal administrative action (including Notices of Violation and Warning Notices).
b. Administrative orders, compliance schedules, and other reports. c. Imposition of fines and fees for noncompliance with LMC provisions. d. Imposition of penalties for noncompliance with administrative orders. e. Assessment of charges for obstruction or damage to City facilities or operations. f. Suspension or termination of services.
g. Civil action.
h. Criminal action.

5. The Utilities Superintendent may apply the enforcement mechanisms available in the LMC in any order, as circumstances warrant.

6. The City will charge any User for the cost of repair of City facilities that are damaged as a result of a User’s noncompliance with the provisions of LMC Chapter 13.20.

7. Any User may petition the Utilities Superintendent to reconsider any enforcement action detailed herein or in LMC Chapter 13.20.

8. The Utilities Superintendent shall reconsider an enforcement action only once per instance of non-compliance per property. A User shall not be permitted to appeal, or file a 68 / 352
Utilities Division
Policy No.: U-6 Sewer Usage: Notices, Penalties, etc. Page 3 of 4 petition for reconsideration of, every enforcement action levied against them for each instance of non-compliance in an attempt to delay or diminish the City’s ability to enforce the provisions of LMC Chapter 13.20.

PROCEDURE:

1. Within seven (7) days of identifying a violation of LMC Chapter 13.20, the Utilities Superintendent or designee shall issue a Warning Notice to the User, instructing them of their responsibility to correct the issue(s) causing the violation.

2. If curative action has not been taken by the User, or if the Utilities Superintendent has not received notice from the User of their intention to address the violation within thirty (30) days of receipt of the Warning Notice, the Utilities Superintendent or designee shall issue a Notice of Violation (“NOV”) to the User.

3. If the User has not taken curative action within thirty (30) days of receipt of an NOV, the Utilities Superintendent or designee shall issue an Administrative Order to the User, which shall contain a compliance schedule for curative action and any other requirements deemed appropriate by City staff.

4. If the User has not completed curative action (as outlined in the compliance schedule of the NOV) within the time period described therein, the Compliance Officer shall assess fees, fines, and penalties, pursuant to LMC Chapter 13.20. Such assessment will include a written notice stating the nature of the enforcement action being taken.

5. Any fees, fines, or penalties that remain outstanding after ninety (90) days will be cause for the suspension or termination of services, at the discretion of the Utilities Superintendent.

6. If the User is unresponsive to the aforementioned enforcement action, the Utilities Superintendent shall recommend to the Public Works Director or City Manager that civil and/or criminal action be taken.

7. In the event that a User petitions the Utilities Superintendent for reconsideration of a decision or enforcement action, the User must submit such a request to the Utilities Division in writing, using the “Petition for Reconsideration of Determination or Enforcement Action” form, attached hereto as Attachment B, within fifteen (15) days of notice of said decision or enforcement action. The Utilities Superintendent or designee shall review the petition and render a decision within fifteen (15) days of its receipt. The User may appeal the decision to the CLMSD Board of Directors within ten (10) days of subsequent notification, if the User has followed the appeal protocols outlined herein.

8. City staff shall agendize properly filed appeal requests to the CLMSD Board of Directors within forty-five (45) days of the date the request was filed. The Board will have fifteen (15) days from the date of the subsequent hearing to render a decision. 69 / 352
Policy reviewed and approved by:
�o±±�
Paul Harris
Utilities Superintendent
Utilities Division
Policy No.: U-6 Sewer Usage: Notices, Penalties, etc. Page 4 of 4 Date
70 / 352
Appendix 3.D
Mutual Aid Agreement with LACOSAN
City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: REFERENCE — document not physically attached
Location: On file at Utilities Administration Office
71 / 352
Appendix 4.A
Collection System Map
City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: ATTACHED
Document follows this cover sheet.
72 / 352
0 City of Lakeport - Sewer Service Area
WDID #: 555010896
Creation Date: 10/23/2025
'
c fl =. . ......... -....ioCreated by: dty of Lakeport -A:
,-~~~-: ~--Jl
~~~] I Ii
~ .....u.:~•Q I
i
Public Woclcs
[email protected]
rn
-~
!C:;!0cyi....r""""""'v
La1<a>ort Poroeb I.M
Ub~,cyP-.1.M
- ~fa---- ..... o,~ __ .,...,. __
- ~~...i-u
Pr<WI~ S-., '--I 18.22
0 ~..,.,._
---
1,450 2,900 5,800 8,700 11 ,600Feet
73 / 352
Appendix 4.B
2025 Sewer Master Plan Update — PACE Engineering, February 2026 City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: REFERENCE — document not physically attached
Location: 2025 Sewer Master Plan Update - PACE Engineering - Adopted by City Council February 2026. 74 / 352
Appendix 5
Adopted Sewer System Design and Construction Standards
City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: REFERENCE — document not physically attached
Location: City of Lakeport Design & Construction Standards 75 / 352
Appendix 6.A
SSO Field Report Form and CIWQS Spill Narrative Template City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: ATTACHED
Document follows this cover sheet.
76 / 352
DATE: I REPORT COMPLETED BY: (Print Name)
FIRST ALERT OF DISCHARGE: AM/PM I BY □ DRIVE BY □ ADMIN OFFICE □ ANSWERING SERVICE □ OTHER REPORTING PARTY NAME: I CONTACTINFO:

ESTIMATED SPILL START• TIME/DATE: I ARRIVAL TIME AT SPILL SITE:

DISCHARGE CONTAINED TIME: AM/PM I SPILL SITE LOCATION (DESCRIPTION OR ADDRESS):

DURATION OF SPILL: (MIN)X ESTIMATED SPILL RATE: (GPM) = ESTIMATED SPILL VOLUME: (GAL) USE SPILL STARTT/ME TO CONTAINED TIME TO DETERMINE DURATION OF SPILL IN MINUTESX ESTIMATED GPM = ESTIMATED SPILL VOLUME LATITUDE : LONGITUDE : TERRAIN: □ FLAT O M IXED O STEEP CHECK All THAT APPLY FOR EACH ENTRY BELOW:

FAILURE POINT OF SPILL: □ MANHOLE PUMP STATION 0 FORCE MAIN (DIAM._ AGE __ ) □ GRAVITY SEWER (DIAM. AGE ) OTHER
CAUSE: 0 DEBRIS O FLOW EXCEEDED CAPACITY □ GREASE BLOCKAGE O OPERATOR ERROR O STRUCTURAL PROBLEM/FAILURE □ PUMP STATION FAILURE □ RAIN EVENT □ ROOTS □ VANDALISM □ OTHER:

SPILL APPEARANCE POINT: □ BUILDING/STRUCTURE O SEWER LINE O MANHOLE □ P/L CLEANOUT O PUMP STATION □ OTHER SEWER SYSTEM STRUCTURE (DESCRIBE)
DID THE SEWAGE REACH CLEAR LAKE? □ YES □ NO O UNKNOWN DID THE SEWAGE REACH A •WATERCOURSE or DI? □ YES ONO *A watercourse is a nawral or manmade feawre (dry, wer, or flowing) including o drainage ditch, swole, tributary or other physical aspect that directly or indirectly enters or has the potential to enter surface waters such as a stream or lake.

NAME OF WATER COURSE/BODY CONDITION: 0 DRY O WET O FLOWING TYPE OF SEWAGE: □ RAW □ PARTIALLYTREATED □ TREATED
FINAL SPILL DESTINATION: □ BUILDING □ UNPAVED SURFACE □ PAVED SURFACE O STORM DRAIN O STREET CURB/GUTTER WAS SPILL FULLY CAPTURED, INCLUDING A DISCHARGE TO STORM DRAIN? □ YES □ NO APPROX. GALLONS CAPTURED
METHOD OF CAPTURE (FULL OR PARTIAL): 0 PUMPER TRUCK O VACTOR TRUCK O OTHER (E.G. SANDBAGS) SPILL RESPONSE ACTIVITIES(CHECKALL THAT APPLY): □ SOLID MATERIALS REMOVED □ WASH DOWN □ DISINFECTION CONTAINED: 0 ALL O PART INSPECTED SEWER CCTV? 0 YES □ NO RESTORED FLOW? 0 YES ONO TIME RESTORED:

RETURNED TO THE SANITARY SEWER SYSTEM □ ALL O PART OTHE R (DESCRIBE) NOTIFIED UTILITIES DIRECTOR? 0 YES □ NO IF YES PROVIDE DATE, TIME, AND TYPE OF NOTIFICATION PHOTOS
When dot:umenting a spill, ~apturing multiple photos from dilferwnt angks is uuda/1 Please take multip_le p_hotos of each ~ategory:
□ START POINT ENDPOINT □ ENTIRE SPILL FLOW PATH □ CAUSE OF SPILL (DEBRIS, ROOTS, FOG, ETC) □ BERMS/MATS PLACED 0 CLEANUP EFFORTS (INCLUDING EQUIPMENT USED AND STAFF WORKING ON THE SPILL) 0 DISINFECTION PROCESS O CCTV OPERATOR SPILL DRAWING/SCHEMATIC:
77 / 352

PROCEED TO NEXT PAGE FOR SPILL VOLUME CALCULAION WORKSHEET

SPILL VOLUME CALCULATION
The purpose of this worksheet is to capture the data and method(s} used in estimating the volume of an SSO. Since there are many variables and often unknown values involved, this calculation is just an estimate. Additionally, it is useful to use more than one method, if possible, to validate your estimate. This information is an important part of the City's SSO reporting requirements.

Check all methods and tools that you used:

D Visual estimate
D Measured surface area and volume
0 Duration and flow rate
Vjsual Estjmate Method- Imagine a bucket(s) or barrel(s) of water tipped over.

Size of bucket(s) or Howmanyofthls Multiplier
barrel(s) Size?
l gal. water jug Xl
Sgal. bucket XS
32 gal. trash can X32
S5gal drum X SS
Total Volume Estimated
Using Visual Method
Total Volume
Estimated
Measured Volume Method (this may take several calculations as may have to break down the odd shaped spill to rectangles, circles, and polygons}
If the entire spill is settled in one area, calculate the volume of spill in feet (L' X W' X D') and convert to gallons (X 7.5 for gallons in a square area, and X .785 for gallons in a circular area}. It is important when guessing depth to measure, if possible, in several locations and use an average depth.

1. Draw a sketch of the spill on separate page

2. Draw shapes and dimensions used for calculations

3. Use correct formula for various shapes (see table below) SSOShape Volume Calculation formula Volume Result
Rectangle l xW X DX 7.5
Circle DX Dx0.785
Polygons Show formula used
Triangle base (ft) X height (ft) X o.s
~ ation and Flow Rate Method
Start date and time:

End date and time:

Total spill duration:

Subtract line 1 from line 2. Show time in minutes
Average flow rate in GPM:

Use separate photo chart to estimate flow rate (account for dlu rnal patterns if long duration)
Total volume estimate:
minutes x gpm

PROCEED TO NEXT PAGE FOR WITNESS/INTERVIEW INFORMATION
78 / 352

WITNESS INFORMATION
On Site Interview 1: Name/Address: _________________________ _ Observation Description:--------------------------------- ____________________ Time Observed Spill:_: __ AM □ PM □ N/A □ On Site Interview 2: Name/Address: _________________________ _ Observation Description:--------------------------------- ____________________ Time Observed Spill: _ : __ AM PM N/A PLEASE PROVIDE ANY ADDITIONAL DETAILS SUCH AS:

Other comments regarding spill start time (more attempted interviews, or reason for no interviews, etc.):

ROUTE THIS COMPLETED REPORT AND ALL PICTURES TO THE COMPLIANCE OFFICER AS SOON AS POSSIBLE 0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000

SECTION BELOW TO BE COMPLETED BY COMPLIANCE OFFICER OR MANAGEMENT STAFF The following notifications required within 2 hours of Category 1 or 2 Spill Report night/weekend
Noti fied Lake County Environmental Health: Date: ____ Time: ____ a.m./p.m. 707-263-1164 263-2690 ACtion Requirements: D Water quality sampling D Sewage Contamination Posting
Notified Lake County Air Quality Management District: ____ Time: ____ a .. m./p.m. 707-263-7000 Notified CalOES: Date: ____ Time: ___ a.m./p.m. CalOES # ________ 800-852-7550 otified Howard Hold/Regional Board: Date: ______ Time: ____ .a.m./p.m. [email protected] D Category 1 {Sanitary sewer system failure with ANY discharge that reaches surface water or drainage channel {dry or wet) or to storm drain system and is not fully captured and returned to sewer) □ Category 2 (Sanitary sewer system failure with 1.000 gallons or greater that do not reach surface water. a drainage channel, or the storm sewer system unless the entire 550 discharged to the storm drain system is fully recovered and disposed of properly) □ Category 3 (Sanitary sewer system failure with a discharge greater than 50 gallons and less than a 1,000 gallons that does not discharge to surface water)
D Category 4 (Sanitary sewer system failure with a discharge less than 50 gallons and does not discharge to surface water) D PLSD (Private Lateral Sewer Discharge)
79 / 352
Appendix 6.B
Hazardous Materials Incident Response Plan
City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: ATTACHED - PLACEHOLDER
Document follows this cover sheet.
80 / 352
Hazardous Materials Incident Response &
Business Plan
City of Lakeport
January 2026 Revision
Prepared by:

Jen Baker, Compliance Officer
81 / 352
Table of Contents
EMERGENCY RESPONSE PROCEDURES............................................................................................. 3 Detect, Identify, and Assess the Hazard ................................................................................... 4 Initiate the Notification Process ............................................................................................... 4 Isolate, Control, and Contain the Hazard ................................................................................. 4 Secure the Scene ....................................................................................................................... 5 In the Event of Fire, Call 911 .................................................................................................... 5 Cleanup ..................................................................................................................................... 5 Post-Incident Reporting/Recording .......................................................................................... 6 Chlorine Leak ............................................................................................................................ 6 Media Communications ........................................................................................................... 7 LAW ENFORCEMENT COORDINATION…………………………………………………………................................. 7 CONTACTS SUMMARY……………………………………………………………………............................................... 7 FACILITY EVACUATION PROCEDURES………………………………………………………….................................. 8 Groundwater Storage Facility Map ........................................................................................... 9 Water Treatment Plant Map ................................................................................................... 10 Wastewater Treatment Plant Map ……………………….………………………….………………………………… 11 PW Corporation Yard Map ....................................................................................................... 12 Scotts Wells Creek Map............................................................................................................ 13 Community Center Map……………………………………………………………………………………………………… 14 HAZARDOUS MATERIALS INVENTORY AND LOCATION................................................................... 15 Groundwater Storage Facility……………………………………………………………………………………………... 15 Water Treatment Plant………………………………………………………………………………………………………. 15 Wastewater Treatment Plant…………………………………………………………………………………………….. 16 Corporation Yard………………………………………………………………………………………………………………… 16 Scotts Creek Wells……………………………………………………………………………………………………………… 17 Community Center………………………………………………………………..………………………………………….. 17 Hazardous Material Location Site Maps…………………………………………………………………………….. 18-23 PERSONNEL TRAINING PROGRAM……………………………………………………………………………………………….. 19 APPENDIX…………………………………………………………………………………………………………………………………….. 26 SEWAGE SPILL EMERGENCY RESPONSE PLAN……………………………………………………………………………….

EMERGENCY RELEASE FOLLOW-UP NOTICE REPORTING FORM…………………………………………………….

EMERGENCY INCIDENT REPORTING FORM…………………………………………………………………………………… LAKEPORT SOP: ILLICIT DISCHARGE RESPONSE & REPORTING
27 51
55 58
82 / 352

EMERGENCY

RESPONSE

PROCEDURES
83 / 352

EMERGENCY RESPONSE PROCEDURES
In the event of a release of hazardous material, close all entry and exits to the release area, move at least 50 feet away from the release area, and dial 9-1-1 immediately. Be sure to name the material being released and an approximate quantity.

Reference the following procedures and use common sense:

Detect, Identify, and Assess the Hazard
a. Evaluate the hazards of the material and estimate the quantity of spilled material. Determine if it is:
• Explosive
• Flammable
• Corrosive
• Toxic
• An inhalation hazard
• An environmental hazard
• A hazard of any sort not listed above
b. Check labels on containers, for example:
• Placards
• Safety Data Sheets
c. If unlabeled, treat as hazardous
d. Check for unusual colors, odors, or sounds
e. Observe instances of unexplainable illness or injuries Initiate the Notification Process
a. Upon identifying a hazardous materials spill, contact the Lakeport Fire Department immediately by dialing 911 and notify your immediate supervisor.
b. The supervisor shall contact the Compliance Officer immediately following notification of a hazardous materials spill.

Isolate, Control, and Contain the Hazard
a. Treat all materials as hazardous until proven otherwise b. Do not touch, inhale, or ingest any unknown material c. Do not eat, drink, or smoke in the incident area
d. Be mindful that other variables (i.e., fire, wind, rain, temperature, etc.) may change risks 84 / 352
Secure the Scene
Without entering the immediate hazard area, do what you can to isolate the area and assure the safety of people and the environment.
a. Isolate and restrict access to the areas that threaten human health and safety b. Move and keep people away from the scene and the perimeter c. If the hazard is compressed gas, evacuate the area and allow the gas to vent d. Create space for emergency response equipment to enter and exit the scene without difficulty e. Remember to stay upwind of the incident scene
f. Remove sources of ignition (e.g., open flames, electrical equipment) g. Close valves and containers
h. Dike, divert, and absorb liquids
i. Cover or suppress emissions with soil, foam, plastic, or similar materials j. Protect storm drains and sewers
k. As best as is reasonably possible, mitigate the effects of hazard on the environment and property l. Mark areas to warn others, restrict access, and prevent accidental contamination or track-out of contaminant
m. Provide assistance to emergency personnel, as appropriate In the Event of Fire, Call 911
a. Evacuate all persons in the affected incident zone to a safe, upwind location b. Take roll call, and make sure all people are accounted for Cleanup
a. Sweep up or collect small spills into a labeled container b. Use absorbents or berms to absorb material
c. Use appropriate equipment to deal with material
d. Do not attempt to clean up large spills of hazardous materials without trained personnel or contractors
e. Dispose of waste material safely and appropriately
f. Low-level Hazmat secured in lockers may be stored onsite until the next local Hazmat collection event
85 / 352
Post-Incident Reporting/Recording
The time, date, and details of any hazardous materials incident that requires implementation of this plan shall be noted in the facility’s operating record.

Within 15 days of any hazardous materials emergency incident or threatened hazardous materials emergency incident that triggers implementation of this plan, a written Emergency Incident Report (attached hereto in the appendix), including, but not limited to a description of the incident and the facility’s response to the incident, must be submitted to the California Environmental Protection Agency’s (Cal EPA)Department of Toxic Substances Control, the local CUPA, the local fire department’s hazardous materials program, and the City’s Compliance Officer.

The report shall include:
a. Name, address, and telephone number of the facility’s owner/operator b. Name, address, and telephone number of the facility
c. Date, time, and type of incident (e.g., fire, explosion, etc.) d. Name and quantity of material(s) involved
e. The extent of injuries, if any
f. An assessment of actual or potential hazards to human health or the environment, where this is applicable
g. Estimated quantity and disposition of recovered material that resulted from the incident h. Cause(s) of the incident
i. Actions taken in response to the incident
j. Administrative or engineering controls designed to prevent such incidents in the future The Compliance Officer may be required to submit an Emergency Release Follow-Up Notice Reporting Form thereafter.

Chlorine Leak
In the event of a minor chlorine leak, all employees are to evacuate the facility, close all exterior doors, and dial 9-1-1 immediately. The City has adopted an Emergency Action Plan and policies related to chlorine gas leaks, which address response and reporting protocols. The EAP and related policies are available upon request.
86 / 352
Media Communications
The Compliance Officer, Utilities Superintendent, Public Works Director, or City Manager shall be responsible for all communication with the media, including announcements, alerts, interviews, and updates.

Media contacts are as follows:

Media Company Medium Phone Contact
Bicoastal Media (KXBX AM & FM,
KNTI, KUKI AM & FM) Radio 707-263-6113 x106 General Manager KPFZ FM Radio 707-263-3640 – W
707-245-7532 -- E Dennis
Mediacom Television 707-998-3122 or
855-224-2253 NA
LCPTV (Local public access TV) Television 707-994-8201 City of Clearlake

LAW ENFORCEMENT COORDINATION
The Lakeport Police Department shall be notified, if necessary, to inform the general public of a serious release of hazardous materials and shall coordinate public canvassing and notification.

CONTACTS SUMMARY

NAME POSITION PRIMARY CONTACT SECONDARY CONTACT
Paul Harris Utilities Director 707-263-3578 x402
[email protected]
707-533-9168
Ron Ladd Public Works Director 707-263-3578 x 401
[email protected]
707-416-8458
Jen Baker Compliance Officer 707-263-3578 x 403
[email protected]
707-889-4642
Agency Name Primary
Contact
Secondary
Contact
Lakeport Police Department 707-263-5491 911
Lakeport Fire Protection District 707-263-4396 911
Lake County Sheriff 707-263-2690 911
California Highway Patrol (CHP) 707-279-0103 911
Lake County Environmental Health 707-263-1164 NA
State Office of Emergency Services (OES) Warning Center 800-852-7550 NA CA Department of Toxic Substances Control 800-618-6942 NA Cal OSHA Division of Occupational Safety & Health 800-321-6742 510-286-7000 Lake County Air Quality Management District 707-263-7000 NA Regional Water Quality Control Board (RWQCB Rancho Cordova) 916-464-3291 NA Poison Control Center 800-222-1222 NA
Sutter Lakeside Hospital – 5176 Hill Rd East Lakeport CA 95453 707-262-5000 NA St Helena Hospital Clearlake - 15630 18th Ave, Clearlake CA 95422 707-994-6486 NA Citizen inquiries should be directed only to the individuals listed above after they have been notified of the spill. 87 / 352

FACILITY EVACUATION PROCEDURES
The following information describes evacuation routes, safe gathering locations, and roll-call procedures at each location where hazardous materials are kept. Please refer to the attached maps for further guidance.

Groundwater Storage Facility (GWSF)- 1825 Riggs Rd
• Personnel are not stationed at this facility, but if personnel are on site, announce evacuation verbally, and via cellular phone communication if necessary. • Evacuate the facility heading east on Riggs Road
• Meet at the Riggs Road intersection for head count
Water Treatment Plant (SWTP) - 590 Konocti Avenue
• Announce evacuation verbally and via cellular phone communication if necessary • Evacuate south through the main gate and meet in the parking lot south of the facility • Use the employee roster for roll-call and head count
Wastewater Treatment Plant (WWTP) - 795 Linda Lane
• Announce evacuation verbally and via cellular phone communication if necessary • Evacuate the facility heading east on Linda Lane
• Meet at the Linda Lane lift station for head count
PW Corporation Yard – 591 Martin St
• Announce evacuation verbally and via cellular phone communication, if necessary, take Martin St PW Corp Yard exit north to baseball field
• Use the employee roster for roll-call and head count
Scotts Creek Wells – 2224 Riggs Rd
• Personnel are not stationed at this facility but, if personnel are on-site, announce evacuation verbally and via cellular phone communication if necessary • Evacuate the facility heading east on Riggs Rd
• Meet at the Riggs Rd intersection for head count
Community Center – 500 N Main St
• Announce evacuation verbally and via cellular phone communication if necessary • Placeholder
• Placeholder
88 / 352
City of Lakeport Haz Mat Incident Response Plan

Page 8 ends

Evacuation Maps
e .
.
.
e Facili
ap
Groundwater
Storage Facility
1825 Riggs Rd
Ma.p Pr epa.red by City of Lm:eport
Public W s Department
abiritbn@cicy·cfla:eport.com

6.7.2122
Lake po rt Wat er Tanks
Buil dlings_Feb2022
Road Footprint
89 / 352
City of Lakeport
City of Lakeport
Surface Water Treatment Plant
,, Evacuation Map
Alternate
Assembly
Area
Assembly
Area
Map Prepared for City of Lakeport Public Works
Department
by RSA+, Lakeport, CA
[email protected]
Haz Mat Incident Re pon e Plan
590 Konocti Ave. Lakeport CA, 95453
Legend
~ Assembly Area
s
0 80 160 Feet
1 inch ""' 80 feet
90 / 352
City of Lakeport Haz Mat Incident Response Plan

Page 10 ends

,. ....................................................................................................................................................................................................................................................................................................................................................................................................................

City of Lakeport
Wastewater lteatment. Plant
Evacuation Map
Map PrepBJ"Bd by Ciiy of L eport
Publ ic WOI s Depar tment
abr itlon@cityoflaleport.,oom

6.7.2022
City Lm it Biou:nd!ary
-
'keport_ Paroels
_
Ja
lGJParcels
_
h - y_2
91 / 352
City of Lak port Haz Mat Incident Response Plan
591 Martin St Lakeport CA, 95453
City of Lakeport
Corporation Yard
Evacuatlon Map
' City of Lakeport
Corporation Yard
591 Martin St.

Lakeport, CA
Assem1bly
Area
Exit to
South Gate
Assembly
Area
Map Prepared for City of Lakeport Public Works
Department
by RSA+, Lakeport, CA
[email protected]
0 Legend
Hazardous Materials
Sta,ndby Generator
@ Propane Gas
Q Eyewash Station
0 fire Extinguishers
6 Gasoline/Diesel
80 1 inch ""' 80 feet
160 Feet
92 / 352
Ci y of Lakeport Haz Ma Incident Re ponse Plan
2224 Rigg Rd Lakeport, CA 95453
City of Lakeport Scotts
Creek Outbuilding
2224 Riggs Rd,
Lakeport, CA.
50u!C$ tsn, TOffl10(n, Glrllllll, IW), ~ ~ {< Ol><,l®co:l:MIIP , ~_-, GIS. Ufaol" ~ f;Srl, tb\$1,, NGA, \/SGS, fMa p Prepared for ~:a~:~~port Public Works ,_H_a_za_-,d-o-. u_s_M_a_t_e-,-,a-,-s-. by RSA+, Lakeport, CA
[email protected]
Evacuation Map
0 Legend
0 First Aid Kit
0 Spill Kit
Standby Generator
0 Fire Extinguishers
250 500 1,000 Feet
I I
1 inch = 500 feet
93 / 352
City of Lakeport
City of Lakeport
Community Center
500 N Main St.

Lakeport, CA ..

Mocrosc,11, -
Map Prepared for City of Lakeport Public Works
Department
by RSA+, Lakeport, CA
[email protected]
Haz Ma Incident Re ponse Plan
500 . Main St. Lakeport CA 95453
Hazardous Materials
Evacuation Map
0 I
Legend
Standby Generator
30 60
I
1 inch = 60 feet
120 Feet
I
94 / 352
Hazardous Materials Inventory and Location
* Hazard Categories listed below (ex. Fire-4) based on the National Fire Protection Association (NFPA) Rating System
Groundwater Storage Facility (GWSF) – 1825 Riggs Rd, Lakeport Material Name Type & Physical
State
Quantity (Max
present on site)
Hazards
Categories (risk
associated with
release)
Location Code
(see map GWSF-1
below for
physical location)
Chlorine Gas Pure (gas) 1350 lbs. Health – 4;
Pressure
release, acute
health, chronic
health, corrosive
See map
Diesel Fuel Liquid 57 gallons Health -1, Fire –
2 See map
Sodium
Hydroxide 50%
Liquid 2500 gallons Health - 3,
Corrosive
See map
Surface Water Treatment Plant (SWTP) – 590 Konocti Ave, Lakeport Material Name Type & Physical
State
Quantity (Max
present on site)
Hazards
Categories (risk
associated with
release)
Location Code
(see map SWTP-1
below for
physical location)
Chlorine Gas Pure (gas) 1350 lbs.

Health – 4;
Pressure
release, acute
health, chronic
health, corrosive
See map
Clarifloc Liquid 120 gallons Toxic See map
Aluminum
Chlorohydrate Liquid 440 gallons Toxic; Corrosive See map 95 / 352
Wastewater Treatment Plant (WWTP) – 795 Linda Lane, Lakeport Material Name Type & Physical
State
Quantity (Max
present on site)
Hazards
Categories (risk
associated with
release)
Location Code
(see map WWTP1 below for
physical location)
Chlorine Gas Pure (gas) 8,000 lbs. Health – 4;
Pressure release,
acute health,
chronic health,
corrosive
See map
Diesel Fuel Liquid 57 gallons Health -1, Fire -2 See map Sweet Orange
Oil Terpenes
Liquid 55 gallons Health -1, Fire -2 See map
** All other materials included in CERS HazMat Inventory are stored in small quantities (< 30 gallons) PW Corporation Yard – 591 Martin St
Material Name Type & Physical
State
Quantity (Max
present on site)
Hazards
Categories (risk
associated with
release)
Location Code (see
map PWCY-1
below for physical
location)
AW 46 Hydraulic Oil Liquid 55 Gallons Health – 0, Fire – 1 See map- Shop Bay
1 Diesel Exhaust Fluid Liquid 200 Gallons Health -1, Fire – 0 See map Shop Bay 1 Diesel Fuel Liquid 3,225 Gallons Health -1, Fire – 2 See map (several locations)
Ethylene Glycol Liquid 220 Gallons Health -1, Fire – 1 See map Shop bay 1 Gasoline Liquid 1,000 Gallons Health – 1, Fire –
3 See map/Bulk Fuel
Gasoline Liquid 55 Gallons Health -1, Fire – 3 See map/Paint shed Glyphosate
Isopropylamine
Liquid 60 Gallons Health – 2, Fire 3,
Reactivity – 1
See map/Pesticide
Shed
Liquefied Petroleum
Gas (lpg)
Gas 620 Gallons Health -2, Fire -4 See map (several
locations)
Liquid Chlorine
Solution
Liquid 220 Gallons Health-4, Fire-0 See map/ Shop Bay
1 Motor Oil Liquid 60 Gallons Health-0, Fire – 1 See map/Shop Bay 1 Motor Oil- Used Liquid 200 Gallons Health -0, Fire – 1 See map – aboveground tank, s side of mechanic shop
Nitrogen Gas 240 Cubic Ft Health -3, Fire -0 See map/ Shop bay Oxygen Gas 150 Cubic Ft Health -3, Fire -0 See map/Shop bay Sweet Orange Oil Liquid 110 Gallons Health -1, Fire -2 See map/Shop Bay 1 ** All other materials included in CERS HazMat Inventory are stored in small quantities (< 30 gallons) 96 / 352
Scotts Creek Wells – 2224 Riggs Rd, Lakeport
Material Name Type & Physical
State
Quantity (Max
present on site)
Hazards
Categories (risk
associated with
release)
Location Code
(see map SCW-1
below for
physical location)
Diesel Fuel Liquid 450 Gallons Health -1, Fire –
2 See map
Community Center – 500 N Main St, Lakeport
Material Name Type & Physical
State
Quantity (Max
present on site)
Hazards
Categories (risk
associated with
release)
Location Code
(see map CC-1
below for
physical location)
Diesel Fuel Liquid 450 Gallons Health -1, Fire –
2 See map

97 / 352
City of Lakeport Haz Mat Incident Response Plan

Page 15 ends

Hazardous Material Location Maps
City of Lakeport Groundwater Storage Facility
Sodium
Hydroxide
Storage Building
Diesel
Generator
Chlorine Storage & Injection Room
and
Legend
; / Chlorine Gas Storage
0 Fire Extinguisher
• Sodium Hydroxide 50%
~ Eyewash Station
Map p ,,.parec1 by Ciiy of Lakel'O't
Pubic Wo,1<5 Oep..W'Mnl
[email protected]
Febru,iry 2020
Control Room
Ha-zardoLJs Matena/s
Bt1s1i1ess Pla11 Map
Revised February 2020
N
W+ E
s
1 inch = 40 feet
98 / 352
City of Lakeport Haz Mat Incident Response Plan

Page 16 ends

City of Lakeport
Surface Water Treatment Plant
590 Konocti Ave.

Lakeport, CA 95453 11
-
D
c::::J
C1 OOQO_JJ
I I - 11 I
Primary Evacuation Route
(to parking lot)
_J I
)
I Parking Lot I
State PtMe Clll1foma II FIPS 0402 Feet
Geogrophc coo<dinale eyolem name. GCS North American 1963 M3I) Prepared by City of Lal<eport P\dc Wo<b Oepenn1e11t abntl0nC~lll<eport.com
0 ~
er~
parf<ing staff □ 1-

KONOCTIAVE
Lagend
A Aklminum Chlarollycnle
♦ Clarifloc (Polyamine)
Ct-.xine Gas Storage
~ Eyewash Station
0 Fire EX1Jn!IU1sher
Parcel Boundary
Bulk1ings/Slrudures
Fence
'
- -
_
---:;--
'---------l
20 40
1 Inch = 40 feet
80 Feet Hazardous Matenals
Business Plan Map
Revised February 2020
99 / 352
City of Lakeport Haz Mat Incident Response Plan

Page 17 ends

0 0
I staff
\
pa;::g
I staff par/<ing
area
--
Pump
Building
Primary Evacuation Ro ute
(to parking area )
City of Lakeport
Waste
water Treatment Plant
795 Linda Lane
Lakeport, CA 95453
Projected coordinate ¥Bil name: NAD 1983
Sae l'taJleC bmia II Fl?S0402 Feet
Gecg;rapllic coordnate ¥ Bil na:m,,: GCS North
Americal> l98l
Mai> Pr E:1)81ed by C ily of Lm: el)Crt
Public Works Del)81tment
ab< itton@cityoflale i>ort. com
Revised J'une 2022
New (2021 ) Seconda ry
Security Gate
(locked @ night)
Haz
Mat
0 30 60
1 inch = 60 feet
Chlorine Gas Stora ge
Hazardous
Materials
Eye
wash Stati on
D Fire Extinguisher
Gas
Storage
WWTP
S
hop &
Storage
Buil
ding
30' X 50'
120 Feet Hazardous Materials
Business Pian Map
June 2022
100 / 352
Ci y of Lakeport
City of Lakeport
Corporation Yard
591 Martin St. ,
Lakeport, CA
--
Exit to
Haz Ma Incident Re ponse Plan
591 Martin St. Lakeport, CA, 95453
Assembly Legend
Area
UO Gallon
Propane Tank
Hazardous Materials
Standby Generator
Propane Gas
Eyewash Station
Fire Extinguishers
Gasoline/Diesel
sc...<es: s.,!, 1<>mTom. Gar~, FAO, OOM, USGS. {e) Oce,;$~~-. {lfld Ille GlS ~ ~ - SOunles! Esr\, ~ato;; .Airbus- OS, USGS, NGA. NASA, CGIAII. R.obi,,__ 14Cf~. N1.S, OS, NW.. Geodi!~, lt/Jl<JW-, ·GSA, Gooien4 Fa,t,\ !n~rm110, l<ld the GJS uso- -~lty Map Prepared for City of Lakeport Public Works
Department
by RSA+, Lakeport, CA
[email protected]
Hazardous Materials
Business Plan Map
0 90 180 Feet
1 inch = 90 feet
101 / 352
Ci y of Lakeport
City of Lakeport Scotts
Creek Outbuilding
2224 Riggs Rd,
Lakeport, CA.

Map Prepared for City of Lakeport Public Works
Department
by RSA+, Lakeport, CA
[email protected]
Haz Ma Incident Re ponse Plan
2224 Rigg Rd Lakeport, CA 95453
Legend
0 First Aid Kit
(l) Spill Kit
Standby Generator
0 Fire Extinguishers
6 Gasoline/Diesel
c=J Lakeport_Parcels_Jan20
Hazardous Materials
Location Map
0 90 180 Feet
1 inch = 80 feet
102 / 352
City of Lakeport
City of Lakeport
Community Center
500 N Main St.

Lakeport, CA ..

Mocrosc,11, -
Map Prepared for City of Lakeport Public Works
Department
by RSA+, Lakeport, CA
[email protected]
Haz Ma Incident Re ponse Plan
500 . Main St. Lakeport CA 95453
Hazardous Materials
Location Map
0 I
Legend
Standby Generator
30 60
I
1 inch = 60 feet
120 Feet
I
103 / 352

PERSONNEL TRAINING PROGRAM
New City employees are required to participate in an extensive introduction to City policies and procedures, which include hazardous communications and awareness. Elements of this introduction are reviewed regularly and modified as appropriate. A new employee training binder was created in 2020 and includes all City safety policies and other related training materials. The training binder is provided to new employees as part of their initial orientation.

The Public Works and Utilities Divisions conduct bi-weekly safety/staff meetings and routinely discusses safe handling of hazardous materials with employees.

Employees are trained and certified every two years on refresher CPR & First Aid protocols by certified trainers. The most recent CPR/First Aid training was in February 2026. Lakeport Fire Protection District and private vendors have provided hands-on instruction on the use of fire extinguishers to City staff.

City utilities staff undergo regular training on the use of emergency response equipment and supplies that are under City control, including spill simulations and hazardous material release exercises. These training sessions are documented, noting employees who were in attendance and the subject of discussion. Additionally, the City will work actively to include documentation of training received in employee personnel files.

All personnel stationed at the locations described in this plan shall be trained on the following procedures:
☐ Internal alarm/notification
☐ Evacuation/ re-entry procedures & assembly point locations ☐ Emergency incident reporting
☐ External emergency response organization notification ☐ Location(s) and contents of Emergency Response/Contingency Plan ☐ Facility evacuation (drills are to be conducted annually) Personnel responsible for the handling and use of the hazardous materials described in this plan shall be trained regularly on the following:
☐ Safe methods for handling and storage of hazardous materials ☐ Location(s) and proper use of fire and spill control equipment ☐ Spill procedures/emergency procedures
☐ Proper use of personal protective equipment (PPE)
☐ Specific hazard(s) of each chemical to which they may be exposed, including routes of exposure (i.e., inhalation, ingestion, absorption)
☐ Hazardous Waste Handlers/Managers should be trained in all aspects of hazardous waste management specific to their job duties (e.g., container accumulation time requirements, labeling requirements, storage area inspection requirements, manifesting requirements, etc.) 104 / 352
This page left intentionally blank
105 / 352
Appendix
106 / 352
Rev. 12/19/2023

SEWAGE SPILL EMERGENCY RESPONSE PLAN POLICY
107 / 352
Rev. 12/19/2023
Sanitary Sewer Overflow
Emergency Response Plan

CITY OF LAKEPORT

UTILITIES DIVISION POLICY
Subject:

Sanitary Sewer Overflow
Emergency Response Plan
Revision 3
Policy Number:

U-11
Date Adopted:
11/30/17
Date Revised:
12/19/2023
Scope: Applies to all personnel that respond to Sanitary Sewer Overflows (SSOs).

Purpose: Establish the City’s activities in response to SSOs. This policy supports the City of Lakeport Sewer Spill Emergency Response Plan (SERP) that outlines all of the City’s SSO response and reporting activities.

Responsibility: The Utilities Director shall be responsible for ensuring SSO response, investigation, reporting and mitigation activities are consistent with this policy and other adopted procedures.

The Compliance Officer and Utilities Director shall be responsible for any future revisions to this SOP.

Reference: City of Lakeport Utilities Division Policies. Yardshare Network location:

S:\Yard Share\Utilities\Policies\Current Policies
108 / 352
Rev. 12/19/2023
Contents
Background ..................................................................................................................................... 5 Overflow Emergency Response Plan .............................................................................................. 5 Dispatch Responsibility ............................................................................................................... 5 First Responder Assessment of Overflow ................................................................................... 6 Overflow Correction, Containment and Clean-Up ...................................................................... 6 Traffic and Pedestrian Control .................................................................................................... 7 SSO Spill Volume and Estimation Methods ................................................................................. 7 Spill Estimation Representative Photographs 8
City of Chico* Manhole Overflow Flowrate Chart .................................................................... 12 Water Quality Monitoring Requirements ................................................................................. 13 SSO Reporting Requirements and Procedures.......................................................................... 13 City of Lakeport Internal SSO Reporting Protocol ..................................................................... 13 Regulatory Reporting Guide ......................................................................................................... 16 SSO Category Determination Flow Chart ................................................................................. 19 SSO Regulatory Reporting Guide from 2023 Spill Emergency Response Plan…………………..15
City of Lakeport Sewer Lift (Pump) Stations and SSO Deployment Maps ....................................... i Lakeport Blvd Lift Station ............................................................................................................. i Larrecou Lane Lift Station ............................................................................................................ i C Street Lift Station ......................................................................................................................ii Martin Street Lift Station .............................................................................................................ii Clearlake Avenue Lift Station ...................................................................................................... iii Rose Avenue Lift Station ............................................................................................................. iii Lakeshore Blvd Lift Station .......................................................................................................... iv Linda Lane Lift Station ................................................................................................................. iv See separate City of Lakeport Sewer Spill Emergency Response Plan + Sewer Spill / Backup Response Workbook for more information and all SSO Reporting Forms………………………..............Error! Bookmark not defined. 109 / 352
Rev. 12/19/2023
Background
Sanitary sewers serving the City of Lakeport can occasionally overflow due to breaks or blockages in the sewer lines. These overflows can result in discharges of raw sewage into surface water/storm drains and eventually into Clear Lake.

The City’s sewer system also includes eight lift (pump) stations that are needed to convey the flows to the Wastewater Treatment Plant on Linda Lane in the southwest portion of the City.

In order to protect public health and the environment from raw sewage, a quick, coordinated response is needed to stop the source of any overflow and to eliminate the migration of sewage either downstream or into Clear Lake.

The City is required to comply with numerous regulations related to sewage overflows and spills established by the California State Water Resources Control Board. To provide a consistent, statewide regulatory approach to address sanitary sewer spills, the State Water Board adopted Statewide General Waste Discharge Requirements for Sanitary Sewer Systems, Water Quality Order No. 2022-0103-DWQ (Sanitary Sewer Systems General Order) on December 6, 2022. The Sanitary Sewer Systems General Order requires public agencies that own or operate sanitary sewer systems to develop and implement sewer system management plans and report all sanitary sewer spills to the State Water Board’s online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database.

In 2023 the City adopted a new Sewer Spill Emergency Response Plan (SERP) that outlines the City’s SSO response activities, with the objective of minimizing impact of SSOs to the public and the environment.

In achieving this goal, the SERP and its related Sanitary Sewer Spill/Backup Response Workbook serves as a guideline for City of Lakeport personnel in cleaning and mitigating the effects of sanitary sewer spills, as well as in following proper water sampling and spill reporting procedures. Detailed SSO reporting requirements established by the State’s Sanitary Sewer Systems General Order are included in the SERP.

Overflow Emergency Response Plan
Dispatch Responsibility
When a call is received from the public, dispatch personnel obtain:
x Time and date of call
x Time and date when overflow was first noticed
x Specific location of possible overflow
x Description of problem
x Spill details: Has the spill reached a storm drain or Clear Lake? x Caller’s name and call back number or email contact info for follow up 110 / 352
Rev. 12/19/2023
First Responder Assessment of Overflow
When? Assessment Steps
Immediately Assess failure of equipment or overflow release If needed Call for assistance
After primary assessment Obtain necessary equipment to respond to spill (e.g. sandbags, waddles, bypass pumps, vacuum
truck, etc.)
If spill too large to be adequately controlled Contact local septic pumping contractor(s) and request emergency service:

Perkins Septic Tank Cleaning: 707.413.6100
Action Sanitary: 707.994.5068
Silva Septic & Rooter Services: 707.462.8304
If there is a suspicious substance or odor (e.g. oil
sheen, foam, gas odor)
Coordinate with County of Lake Environmental
Health and Lake County Fire Protection District
for hazardous materials response
Overflow Correction, Containment and Clean-Up
Always… If applicable…
Protect water bodies, drainage channels and
storm drains by diverting flow away from all
entry points
If failure is at a lift station, take the
malfunctioning pump off line. See lift station
maps at end of this Policy for diversion
locations and details.

Determine location and cause of overflow Secure the affected area and post warning signs if deemed necessary (also see “Traffic
and Pedestrian Control” below).

Implement appropriate corrective actions
(e.g. sandbags, waddles, emergency
generators, bypass pumps, etc.)
Sample receiving waters as necessary
(coordinate with Lake County Environmental
Health Department – see Section 9 of City’s
SERP). See lift station maps for details
regarding lift station failures.

Clean and sanitize affected area(s): remove all debris found in SSO area; wash SSO area with fresh water; collect all water generated during cleaning with Vacuum Truck and return water Always Remember…
x Use appropriate Personal Protective Equipment
x Use appropriate safety precautionary measures
111 / 352
Rev. 12/19/2023
Always… If applicable…
to sewer system; use backpack sprayer to sanitize affected areas with disinfectant cleaner such as Zep DZ-7.

Finalize the incident documentation using Sewer Spill Field Report forms in the SERP’s Sanitary Sewer Spill/Backup Response Workbook.

Review overall response with Responding Parties.

Traffic and Pedestrian Control
Traffic and Pedestrian Control Recommendations
• Set up cones and warning signs
• Set up warning signs to inform public of hazards if deemed necessary • Close affected entrances and exits from facilities
• Perform lane closures as necessary
• Use caution tape and barricades to prevent public access • Inform Lakeport Police Department of any roadway closures / traffic control SSO Spill Volume and Estimation Methods
Outlined below are three methods that are most often employed for estimating the volume of sanitary sewer spill. City staff preparing the estimate should utilize the most appropriate method for the sewer overflow in question and use the best information available. Refer to the City’s SERP for more details.

Method 1: Eyeball Method
The volume of small spills can be estimated using an “eyeball estimate.” To use this method, imagine the amount of water that would spill from a container listed on the table below. A jug contains 1 gallon, a bucket contains 5 gallons, and a drum contains 55 gallons. If the spill is larger than 55 gallons, try to break the standing water into 55 gal drums and then multiply by 55 gallons. This method is useful for contained spills up to approximately 220 gallons. The photo illustrations incorporated herein should also be referred to when using the Eyeball Method.

Size of
container
How many
of this size?
Size Multiplier
(gal)
Total Volume Estimated (gal)
1-gallon water jug X 1
5-gallon bucket X 5
55-gallon drum X 55
Total volume
estimated

112 / 352
Rev. 12/19/2023
Spill Estimation Representative Photographs
Five (5) Gallons Total Spilled:

Ten (10) Gallons Total Spilled:
113 / 352
Rev. 12/19/2023
Ten (10) Gallons Flowing Down Curb & Gutter:

Note: Water traveled 110 FT in curb & gutter.

All photos courtesy of City of Hayward
https://www.hayward-ca.gov/file/ssmp-sso-emergency-response-sopspdf Method 2: Measured Volume
The volume of most small spills that have been contained can be estimated using this method.

The shape, dimensions, and the depth of the contained wastewater are needed. The shape and dimensions are used to calculate the area of the spills and the depth is used to calculate the volume.

Common Shapes and Dimensions

RECTANGLE CIRCLE TRIANGLE
w H
"" E
D

T DIAMETER G
H "'- H
T

LENGTH BASE
114 / 352
Rev. 12/19/2023
Steps for Volume Calculation
Step 1 Sketch the shape of the contained sewage (see figure above).

Step 2 Measure or pace off the dimensions.

Step 3 Measure the depth at several locations and select an average.

Step 4 Convert the dimensions, including depth, to feet.

Step 5 Calculate the area in square feet using the following formulas:

Rectangle: Area = length (feet) x width (feet)
Circle: Area = diameter (feet) x diameter (feet) x 0.785 Triangle: Area = base (feet) x height (feet) x 0.5
Step 6 Multiply the area (square feet) times the depth (in feet) to obtain the volume in cubic feet.

Step 7 Multiply the volume in cubic feet by 7.5 to convert it to gallons.

Method 3: Duration and Flowrate
Calculating the volume of larger spills, where it is difficult or impossible to measure the area and depth, requires a different approach. In this method, separate estimates are made of the duration of the spill and the flowrate. The methods of estimating duration and flowrate are:

Duration
The duration is the elapsed time from the time the spill started to the time that the flow was restored.

Start Time: The start time is sometimes difficult to establish. Here are some approaches:

1. Local residents can be used to establish start time. Inquire as to their observations. Spills that occur in rights-of-way are usually observed and reported promptly. Spills that occur out of the public view can go on longer. Sometimes observations like odors or sounds (e.g. water running in a normally dry creek bed or drainage channel) can be used to estimate the start time.

2. Changes in flow on a downstream flowmeter can be used to establish the start time. Typically, the daily flow peaks are “cut off” or flattened by the loss of flow. This can be identified by comparing hourly flow data during the spill event with flow data from prior days. This method will likely only be effective with consistent weather.

3. Conditions at the spill site change over time and can be used to establish the start time. Initially there will be limited deposits of toilet paper and other sewage solids. After a few days to a week, the sewage solids form a light-colored residue. After a few weeks to a month, the sewage solids turn dark. The quantity of toilet paper and other materials of sewage origin increase over time.

These observations can be used to estimate the start time in the absence of other information.

Taking photographs to document the observations can be helpful if questions arise later in the process. This method is valid for spills that have been occurring for a long time and may be used in conjunction with either of the above methods.

4. It is important to remember that spills may not be continuous. Blockages are not usually complete (some flow continues). In this case the spill would occur during the peak flow periods (typically 10:00 to 12:00 and 13:00 to 16:00 each day). Spills that occur due to peak flows in excess of capacity will occur only during, and for a short period after, heavy rainfall. 115 / 352
Rev. 12/19/2023
End Time: The end time is usually much easier to establish. Field crews on-site observe the “blow down” that occurs when the blockage has been removed. The “blow down” can also be observed in downstream flowmeters.

Flow Rate
The flowrate is the average flow that left the sewer system during the time of the spill. There are three common ways to estimate the flowrate:

1. City of Chico Manhole Overflow Flowrate Chart: This chart, included herein, shows sewage flowing from manhole covers at a variety of flowrates. The observations of the field crew can be used to select the appropriate flowrate from the chart. If possible, photographs are useful in documenting basis for the flowrate estimate.

2. Flowmeter: Changes in flows in downstream flowmeters can be used to estimate the flowrate during the spill.

3. Counting Connections: Once the location of the spill is known, the number of upstream connections can be determined from the sewer maps. Multiply the number of connections by 200 to 250 gallons per day per connection or 8 to 10 gallons per hour per connection.

For example: 22 upstream connections * 9 gallons per hour per connection = 198 gallons per hour / 60 minutes per hour
= 3.3 gallons per minute
Duration and Flow Rate Calculation
Once duration and flowrate have been estimated, the volume of the spill is the product of duration (hours or days) and the flowrate (gallons per hour or gallons per day).

For example: Spill start time = 11:00
Spill end time = 14:00
Spill duration = 3 hours

3.3 gallons per minute x 3 hours x 60 minutes per hour
= 594 gallons
116 / 352
Rev. 12/19/2023
City of Chico* Manhole Overflow Flowrate Chart
*City of Chico, CA SSO Response Plan; Appendix G; 2014 updatehttp://www.chico.ca.us/general_services_department/operations_and_maintenance/documents/SSORPUpdateJuly312014forweb.pdf ...
z
117 / 352
Rev. 12/19/2023
Water Quality Monitoring Requirements
The SSO Water Quality Monitoring Program is meant to assess impacts from SSOs to surface waters in which 50,000 gallons or greater are spilled into local surface waters such as Forbes Creek and Clear Lake. x Refer to SSO Water Quality Sampling, Testing and Reporting protocols set forth in Section 9 Water Quality of the City of Lakeport SERP.
x All samples being tested for indicators are to be analyzed in an accredited or certified laboratory.
x When analyzing samples, only use monitoring instruments and devices that have been properly maintained and calibrated.

SSO Reporting Requirements and Procedures
Any prohibited discharge or spill of untreated or partially treated sewage/wastewater (SSO) from a public sewer system must be reported to state and local agencies responsible for oversight, abatement and public health and safety. Specifically, those agencies include:
x California State Water Resources Control Board (SWRCB) x Central Valley Regional Water Quality Control Board (RWQCB) x State Office of Emergency Services (OES)
x Lake County Environmental Health Department (LCEH)
x Lake County Air Quality Management District (LCAQMD)
x SSO Investigation and Documentation Forms are included in the Sewer Spill/Backup Response Workbook adopted in 2023 and located on PW Network: S:\Yard Share\Utilities\WASTEWATER\SSMP\1 SERP Update DKF Task 2023\1 FINAL SERP 7.27.23. Also available on the City’s website.

City of Lakeport Internal SSO Reporting Protocol

1. Any active or inactive SSO which occurs within the City’s sewer system (including the treatment plant) and is a result of, but not limited to, a blockage or obstruction, surge, equipment failure or malfunction, or inappropriate connection of a private lateral to a City main must be reported using the protocols and procedures outlined within this policy and the City’s SERP.

2. For purposes of this Policy, an active SSO shall refer to any spill that is in progress at the time identified or observed by City staff. An inactive SSO is any suspected spill positively determined to have occurred by the Utilities Director, or designee.

3. Evidence of any suspected SSO reported to, or identified by, Department staff should be evaluated by the Utilities Director, or designee. That individual shall determine whether a SSO did occur and, if so, the magnitude of the spill.

4. If evidence at a suspected SSO site suggests that a spill occurred, but an exact source, amount of discharge, and destination cannot reasonably be substantiated, the Utilities Director may report the incident to the Compliance Officer at his/her discretion.

5. Unless creating a nuisance (as determined by the Utilities Director), any active, inactive or suspected SSO on private property (PLSD), resulting from a blockage or failure of a sewer lateral from the property to the City right-of-way may not be reported to the Compliance Officer if the source and destination of the spill is determined to be localized to that property.

6. For purposes of this policy, a nuisance shall be defined as anything which meets all the following criteria:
a. Is a health hazard or has the possibility of being a health hazard, or is indecent or offensive to the senses and restricts the free use of the property;
118 / 352
Rev. 12/19/2023
b. Affects the entire community, neighborhood, or any other reasonable number of persons; and c. Occurs during, or because of, the treatment or disposal of sewage or wastewater.

7. Reporting of active or suspected SSOs on private property, deemed reportable by the Utilities Director, shall include ownership information of that property and contact information for that owner.

8. If any active or suspected SSO (as determined by the Utilities Director to be an inactive spill) is observed or suspected of reaching a drainage channel or surface water, the Compliance Officer must be notified immediately.

9. Any SSO deemed reportable by the Utilities Director must be reported to the Compliance Officer.

SSOs shall be reported as required by the State’s Sanitary Sewer Systems General Order using the reporting forms included in the SERP’s Sewer Spill/Backup Response Workbook.

10. Any active or inactive SSO estimated to be over 1,000 gallons in volume must be reported to the Public Works Director and the City Manager.

11. The Utilities Director, acting as the City’s Legally Responsible Official (LRO), shall be responsible for all SSO regulatory reporting to state and local agencies (referred to herein) and is authorized to certify such reporting as the duly authorized representative of the City of Lakeport Municipal Sewer District. The Compliance Officer is a CIWQS Data Submitter. LROs and Data Submitters have different levels of access in CIWQS:
x Data Submitters are authorized to enter data into CIWQS for the facility or collection system to which they have been given access by an LRO.
x In addition to Data Submitter rights, LROs are authorized to certify and submit reports for the regulated facility or collection system. LROs have the additional ability to manage active Data Submitters under their facility or collection system.

12. Individual SSO records, including SSO Investigation and Report Forms, shall be maintained and kept by the Department for five (5) years. The RWQCB may extend this period at their discretion.

When reporting a SSO to the Compliance Officer or Utilities Director, the following procedures shall be followed:

1. As soon as Department staff become aware of an active or inactive SSO (as determined by the Utilities Director), and without substantially impeding cleanup or other emergency efforts, the Sewer System Supervisor, or designee, shall complete, sign and submit a Sanitary Sewer Spill Field Report form (see Section D-1 of the SERP’s Sewer Spill/Backup Response Workbook) to the Compliance Officer.

2. If an active or inactive SSO results in discharge to a drainage channel or surface water, the Sewer System Supervisor shall immediately notify the Utilities Director by phone.

3. Upon receipt of notification of an active or inactive SSO discharging to a drainage channel or surface water, the Utilities Director shall immediately notify the Compliance Officer who shall complete all required notifications and reporting. A separate Illicit Discharge report may be necessary for certain SSOs that impact Waters of the State. An illicit discharge is defined as any discharge to the City's storm drain system, or to natural surface waters, that is not composed entirely of stormwater. See City of Lakeport Public Works SOP PW01 Illicit Stormwater Discharge Detection, Response & Reporting for more information.

4. Category 4 SSO reporting requirements:
a. If, during any calendar month, Category 4 spills occur, certify monthly, the estimated total spill 119 / 352
Rev. 12/19/2023
volume exiting the sanitary sewer system, and the total number of all Category 4 spills into the online CIWQS Sanitary Sewer System Database, within 30 days after the end of the calendar month in which the spills occurred.
b. Upload and certify a report, in an acceptable digital format, of all Category 4 spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occur.

5. The Compliance Officer shall complete and submit an Annual Report into the online CIWQS Sanitary Sewer System Database by April 1 of each year. The previous year’s Annual Report shall be updated by April 1 of each year after the Effective Date of the 2022 General Order, for each calendar year (January 1 through December 31). See Section 3.9 of Attachment E1 of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR)

6. If no SSOs have been reported, identified, or substantiated in any given calendar month, the Compliance Officer shall submit a “No Spill Certification Report” to the SWRCB through the CIWQS Database. This report must be submitted no later than 30 days after the end of the month in question.

7. All reports and information submitted to the SWRCB shall be certified as described in State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) referenced above.

8. The Compliance Officer or Utilities Director shall be responsible for notifying the Public Works Director of any spill over 1,000 gallons in volume; the Public Works Director shall notify the City Manager.

9. The Compliance Officer shall report SSOs to all appropriate state and local agencies based on the following criteria and reporting protocols:

CATEGORIES DEFINITIONS
CATEGORY 1 A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under the State Water Board Order No. WQ 2022- 0103-DWQ (SSSWDR) that results in a discharge to:
x A surface water, including a surface water body that contains no flow or volume of water; or
x A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.

A spill from a City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City shall report all Category 1 spills per section

3.1 of Attachment E1 (Notification, Monitoring, Reporting and Record keeping Requirements) of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR).

CATEGORY 2 A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under the State Water Board Order No.

WQ 2022-0103-DWQ (SSSWDR) that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill. 120 / 352
Rev. 12/19/2023

CATEGORIES DEFINITIONS
CATEGORY 3 A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) that does not discharge to a surface water. A spill of equal to or greater than SO gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.

CATEGORY 4 A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under the State Water Board Order No. WQ 2022-0103- DWQ (SSSWDR) that does not discharge to a surface water. A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

PRIVATE

LATERAL

SEWAGE SPILL
Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately-owned sewer lateral connected to the enrollee’s sanitary sewer system or from other private sewer assets. Spills from private laterals that the enrollee becomes aware of may be voluntarily reported to the SSO Database.

The Lakeport SERP includes the following definitions:
x A private sanitary sewer system is a sanitary sewer system of any size that is owned and/or operated by a private individual, company, corporation, or organization. A private sanitary sewer system may or may not connect into a publicly owned sanitary sewer system.
x Private Sewer Lateral: In Lakeport, upper laterals are typically privately owned and maintained. A private sewer lateral is the privately-owned lateral that transports sewage from private property(ies) into a sanitary sewer system.

The reporting deadline for submittal of a SSO report to the SWRCB depends on the classification of the spill as shown in the above table and in the City’s Spill Emergency Response Plan (SERP) and the Notification, Reporting, Monitoring and Recordkeeping Requirements outlined in Attachments E-1 and E-2 of the State’s Sanitary Sewer Systems General Order.

Regulatory Reporting Guide
See the City’s Sewer Spill Emergency Response Plan (2023) for more details regarding the reporting protocols.
121 / 352
Rev. 12/19/2023

ELEMENT REQUIREMENT METHOD

NOTIFICATION
(See Attachment E1 of
State Water Board
Order No. WQ 2022-
0103-DWQ (SSSWDR)
Within two hours of becoming aware
of any Category 1 SSO greater than or
equal to 1,000 gallons discharged to
surface water or spilled in a location
where it probably will be discharged
to surface water, notify the California
Office of Emergency Services (Cal
OES) and obtain a notification control
number.

Within two (2) hours of the City’s
knowledge of a Category 2 spill of
1,000 gallons or greater threatening
to discharge to waters of the State:

Notify California Office of Emergency
Services and obtain a notification
control number.

Note: The City of Lakeport typically
notifies Cal OES for all reportable
spills to obtain a control number.

Call Cal OES at: (800) 852-7550
NOTIFICATION SSO All Categories: Notify Lake
County Environmental Health Dept.
and Lake County Air Quality
Management District
LCEH: (707) 263-1164
LCAQMD: (707) 263-7000

REPORTING
(See Attachment E1 of
State Water Board
Order No. WQ 2022-
0103-DWQ (SSSWDR)
for ALL reporting
requirements)
Category 1 SSO: Submit draft report
within three business days of
becoming aware of the SSO and
certify within 15 calendar days of SSO
end date. Submit Technical Report
within 45 calendar days after the spill
end date for a Category 1 spill in
which 50,000 gallons or greater
discharged to surface waters; and
submit Amended Spill Report within
90 calendar days after the spill end
date.

Category 2 SSO: Submit Draft Spill
Report within three (3) business days
of the City's knowledge of the spill.

Submit Certified Spill Report within
15 calendar days of the spill end date;
and submit Amended Spill Report
within 90 calendar days after the spill
end date.

Category 3 SSO: Submit monthly
Certified Spill Report to the online
CIWQS Sanitary Sewer System
Enter data into the CIWQS Online
SSO Database
http://ciwqs.waterboards.ca.gov,
certified by enrollee’s Legally
Responsible Official(s).

J
122 / 352
Rev. 12/19/2023

ELEMENT REQUIREMENT METHOD
REPORTING (cont.)
Database within 30 calendars days
after the end of the month in which
the spills occur; and submit Amended
Spill Reports within 90 calendar days
after the Certified Spill Report due
date.

Category 4 SSO: If, during any
calendar month, Category 4 spills
occur, certify monthly, the estimated
total spill volume exiting the sanitary
sewer system, and the total number
of all Category 4 spills into the online
CIWQS Sanitary Sewer System
Database, within 30 days after the
end of the calendar month in which
the spills occurred.

Upload and certify a report, in an
acceptable digital format, of all
Category 4 spills to the online CIWQS
Sanitary Sewer System Database, by
February 1st after the end of the
calendar year in which the spills
occur. See Lakeport SERP and Section

3.6 of Attachment E1 of State Water
Board Order No. WQ 2022-0103-
DWQ (SSSWDR) for more details.

These reporting requirements are detailed within the following documents:
x State Water Resources Control Board, Order WQ 2022-0103-DWQ, Statewide General Waste Discharge Requirements; General Order for Sanitary Sewer Systems x California Regional Water Quality Control Board, Central Valley Region, Order No. R-5-2012- 0025, Waste Discharge Requirements for City of Lakeport Municipal Sewer District x City of Lakeport Sewer Spill Emergency Response Plan (SERP), adopted in 2023 123 / 352
Rev. 12/19/2023
SSO Category Determination Flow Chart from 2023 Spill Emergency Response Plan INSTRUCTIONS: Answer each ques.tion iin order and stop at the red box once you have determined the category.

Wa,s the sewage spill from or ca used by the Oty's
sanita,ry sewer system, which is regulated 1under t he
Sanitary Sewer Systems General Order?
YES I
NO The City ts not required to report
spills that are not from or caused
by Its regulated sewer system.

Did the spill resul:t in a discharge to surface water, induding a YES s 1.1 r face water body that contains no ffow or volume of water?· ----------- NO
YES
Did the spill result in a discharge to a drainage
oonveyance system that discha rges t o surfaoe water?
Yl::S
Was the· sewage in, the drainage corweyance system
fully captu,red and returned to the sanitary sewer
system or disposed of properly?
NO
Does the drainage conveyance system discharge to a NO t--------- d e di cat e d stormwater infiltrat ion basin or facil it y? YES
What is the estimated spill vollume?
less tha n 50
gallons
Between, SO gallons
a,nd 999 gallons
1,000 gallons or
greater
Category
1 Spill
124 / 352
Rev. 12/19/2023
SSO Regulatory Reporting Guide from 2023 Spill Emergency Response Plan City of La keport Spill Emeri::ency Response Plan
Regulatory Reporting Guide B-1: Page 1
Thi! Oty' $ Ll!ga lly Rl!s ponsi bl!! Offi c·a Is { Os) are a ut .orlz!!d to !!h:ic □ nlcally sign and Cl!rtify s pi 11 reports in CIWQS. S!!!l contact information or LR Os on page A•2,
Cat~gory 1 Spill'
Witilin two (2) ti.ours o h.e
City'~ n.owletlg,e o a
Category 1 spi II o l,000
gallons or gre;lter,
d lscharging or threa tenlng
to disdl arlle to Waters of
the Sta c, riotify CalOES
and obtal:n a, notlfl atlon
Col'itlliCt w<11te (IU<l!llty
; a mpli ng o the rnceiving
water wld'lln l S hours of
initial ~lf1owledge o,f spill of
50,000 g ;i llons or 11reate to
cl Sp,i11
15 ca le dar
,of the spill end da t.e.
mit Amended Sp i!I
Re port, as eede , within
90 ca, end ar da,vs a,fter Ihle
pill nd date.)
Submit Te ~hniccal Report
w ltn in 4S ca erufa day
a erthe :spill c r d date for
a Category l spill In whldl
50,000 gallons or great.er
d isdl'arged ~o urface
category 2 Spill._.

Witil in two {2.) oiirs. o
• e City'~ lc;nowledge ,of a
Category 2 i.pill o 1,000
gallons or greater
rea,le nl ng ~o d ls charge
to Waters. of the State,
notify QitoES an d obtain a
notlfkatlon control
number.

Submit Draft Spill Report In
e CIWQ,S databa5e-.

Submit Certifiecl Spill
Report within 15 ca lenda,r
days of tl'le pill en cl date.
{S bmit Am n de(I Spill
Report, as needed, thin
90 ta;lendar clay5 a Her th.e
spi II end 011te.)
See++ not!? b@!ow.

Category 3 Spill,..

S1.1b111 it monthly Certilied Spill
Report to tl'le onllne CIWQS
San lta,rv sewer System
Databa e
(S'1.1 mitAmerL .ed S:Prn Report,
as needecl, within 90 calendar
da~·s after th@ Cortifierl Spill
Report dLie da,1@.)
* A spill from an Enroll@@•own@d and/or op@rated lat@ral that dis.charge.s. to .a surfarn wat@r is a Cat@gory 1 spill. ++ S.11:1! following page for notl!SCategory 4 Spi I.._.

Ce r ·ty mo11ttily, tne
estl:nut@d total spill
volume exiting the
a nitary ew r yste rn,
and th.e tota I numb@r ,of
all Category 4 spills Into,
the online CIWQS
Sanit3ry 5 wer Sy ~ m
Database.

Up oad a ncl ce • a
report, in an a.cce ptable
d illitill format, of iii I
Categc,ry 4 spms to th.e
.:ml ne CIWQS Sanitary
se11,er s1;ste rn
Dam base.
125 / 352
i Rev. 1/23/2024
City of Lakeport Sewer Lift (Pump) Stations and SSO Deployment Maps

1. Lakeport Blvd Lift Station 1015 S. Main Street

2. Larrecou Lane Lift Station 591 Martin Street
Lakeport Blvd.

Uft Station
1015 S. Main St.
l 1r
I~
~
Use BMPsto
Protect Forbes
Creek
(225 feet northwest)
I I
I I
Use BMPsto
Protect Storm
Drain Curb Inlet I
-
Larrecou La~,.,.)
Uft Station 1
591 Marlin St.

I
KST
r ,.......------,-,~2-
Use BMPs to
Protect Storm Drains
in Central Corp Yard
126 / 352
ii Rev. 1/23/2024

3. C Street Lift Station 36 C Street

4. Martin Street Lift Station 601 Martin Street
r-------, tIJ
C Street
Lift Station
36 C street
_;;
CST
)
/
0 - 1339.

Marlin Street
Uft StaUon
601 Martin St.
,---u-:s_e_B_M_P_s-to-- 1326 ___ D_~ I
Protect Clear Lake -- 1324
(200 feet southeast) ,,,.--~
( /
r--._____:':J:.:.~:...... 1
-----1~ 1.!
127 / 352
iii Rev. 1/23/2024

5. Clearlake Avenue Lift Station 13 Clearlake Avenue

6. Rose Avenue Lift Station 80 Rose Avenue
/ CLEAR LAKE AVE
Clearlake Ave,.

Lift Station I 711~
13 Clearlake A~
• I I
RoseAve.

Lift Station
BO Rose Ave.

I- /,
(/)
z
<(
-----::?:
z
Use BMPs to
Protect Clear Lake
( 120 feet east)
Skylark Motel - --
Use BMPs to
Protect Clear Lake
(575 feet east)

ROSE AVE
128 / 352
iv Rev. 1/23/2024

7. Lakeshore Blvd Lift Station 1949 Lakeshore Blvd

8. Linda Lane Lift Station 695 Linda Lane
Policy reviewed and approved by:

SIGNED COPY ON FILE
Paul Harris
Utilities Director
Date
12/27/2023
(ff
z
<(
~ ....J
w
CJ)
(!)
I ~ 1,· f ~ I ~
I r
1 ( _ ,, /'
l I / .,. :...:.:. "' L--!....--------, ,....1-__ _.___7 Lakeshore Blvd. ~ use BMPs to '
.. -
Lift Station Protect Drain Inlet /
1949 Lakeshore Blvd. @ Ashe St
;
.,
,·
'}
---- L-1 ---
129 / 352
v Rev. 1/23/2024

SEE SEPARATE CITY OF LAKEPORT SEWER SPILL
EMERGENCY RESPONSE PLAN (2023) + SERP SEWER
SPILL/BACKUP RESPONSE WORKBOOK (2023) FOR

MORE REPORTING DETAILS AND ALL SSO REPORTING
FORMS
From the 2023 Sewer Spill Emergency Response Plan:

1. PURPOSE
The purpose of the City of Lakeport Spill Emergency Response Plan (SERP) is to support a prompt, orderly and effective response to spills (sanitary), reduce spill volumes, and collect information for prevention of future spills. A "spill" in this document is defined, by State Water Board Order No. WQ 2022-0103-DWQ as a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure.

The SERP provides guidelines for City personnel to follow in responding to, cleaning up, reporting, and properly documenting spills that may occur within the City's service area. This SERP satisfies the State Water Board Order No. WQ 2022-0103- DWQ, which require wastewater collection agencies to have a Spill Emergency Response Plan.

Additionally, the SERP outlines procedures for responding to sanitary sewer spill backups into structures as required by the City's insurer. "Backup" is a term typically used by insurers to describe property damage resulting from exposure and contact to untreated or partially treated sewage.

2. POLICY
The City's employees are required to report all spills from agency owned sewer mains and publicly owned laterals found and to take the appropriate action to secure the spill area, properly report to the appropriate regulatory agencies, relieve the cause of the spill, and ensure that the affected area is cleaned as soon as possible to minimize health hazards to the public and protect the environment. The City's goal is to respond to sewer system spills as soon as possible following notification. The City will follow reporting procedures regarding sewer spills as set forth by the Central Valley Regional Water Quality Control Board and the State Water Board Order No. WQ 2022- 0103-DWQ (SSSWDR).

The Lakeport SERP and Sewer Spill/Backup Response Workbook are located on the PW network: S:\Yard Share\Utilities\WASTEWATER\SSMP\1 SERP Update DKF Task 2023\1 FINAL SERP 7.27.23 and on the City’s website:
www.cityoflakeport.com/public_works/sewer/document_center.php#outer-283 130 / 352
vi Rev. 1/23/2024

EMERGENCY RELEASE FOLLOW-UP NOTICE REPORTING FORM
\Vritten Reporting of Emergency Releases
The requirements for written reports can be found in the California Code of Regulations - Title 19.

Division 2. Chapter 4. Article 2. Section 2632. which states:
(a) If required to submit a written emergency release follow-up notice pursuant to 42 U.S.C. section 11004( c) (1989). or as that section may be subsequently amended. a business shall prepare the written emergency release follow-up notice using the fonn specified in subsection ( c) of this section.
(b) A written emergency release follow-up notice prepared pursuant to subsection (a) shall be sent to the Chemical Emergency Platming and Response Commission (CEPRC) at 3650 Schriever Avenue. Mather, CA 95655. This written report shall be sent as soon as practicable following a release, but no later than 7 clays from the date of the release. (c) The following reporting fonu (with instmctions). the ·Emergency Release Follow-up Not.ice Reporting Fonu.' shall be used for filing the written emergency release follow-up notice required by subsection (a) of this section.
131 / 352
vii Rev. 1/23/2024

EMERGENCY RELEASE FOLLOW - UP NOTICE REPORTING FORM
CONTROL NO.

CHECK IF RELEASE REQUIRES NOTIFI -

GAS SOLID LIQUID

TIME OF RELEASE
A
B
C
D

FACILITY EMERGENCY CONTACT & PHONE NUMBER
DAY YR
(use 24 hr time)
TIME
OES

NOTIFIED

CITY / COMMUNITY
CAS Numb er
GAS
( ) -
OES

COUNTY ZIP
CATION UNDER 42 U.S.C. Section 9603 (a)

SOLID LIQUID

PHYSICAL STATE RELEASED QUANTITY RELEASED

AIR WATER GROUND OTHER

DURATION OF RELEASE

DAYS HOURS MINUTES
DATE

INCIDENT MO

BUSINESS NAME

INCIDENT ADDRESS LOCATION
CHEMICAL OR TRADE NAME (print or type)

CHECK IF CHEMICAL IS LISTED IN
40 CFR 355, APPENDIX A

PHYSICAL STATE CONTAINED

ENVIRONMENTAL CONTAMINATION

ACTIONS TAKEN
E
F CHRONIC OR DELAYED (explain)
G
ACUTE OR IMMEDIATE (explain)
NOT KNOWN (exp lain)
KNOWN OR ANTICIPATED HEALTH EFFECTS (Use the comments section for addition information)

ADVICE REGARDING MEDICAL ATTENTION NECESSARY FOR EXPOSED INDIVIDUALS

COMMENTS (INDICATE SECTION (A - G) AND ITEM WITH COMMENTS OR ADDITIONAL INFORMATION) H
I
CERTIFICATION: I certify under penalty of law that I have personally examined and I am familiar with the information sub mitted and b elieve the sub mitted information is true, accurate, and comp lete.

REPORTING FACILITY REPRESENTATIVE (print or type)
SIGNATURE OF REPORTING FACILITY REPRESENTATIVE DATE:
-s ~
~ I I I I I I I~ I I I I I ~ I I I I I I
~~ ~ ~ -s ~
~ □ ~ □
~ □ □ □ □ □ □ ~
Jo □ □ □ ~ ~- - - -I
I
I
I
I
I
I
~
■
- I
I
I □
I □
I □
rn
- I
I
I
I
I
I ~
~._____~ ___ _______,
132 / 352
viii Rev. 1/23/2024

EMERGENCY RELEASE FOLLOW-UP NOTICE

REPORTING FORM INSTRUCTIONS
GENERAL INFORMATION:

Chapter 6.95 of Division 20 of the California Health and Safety Code requires that written emergency release follow-up notices prepared pursuant to 42 U.S.C. § 11004, be submitted using this reporting form. Non-permitted releases of reportable quantities of Extremely Hazardous Substances (listed in 40 CFR 355, appendix A) or of chemicals that require release reporting under section 103(a) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [42 U.S.C. § 9603(a)] must be reported on the form, as soon as practicable, but no later than 30 days, following a release. The written follow-up report is required in addition to the verbal notification.

BASIC INSTRUCTIONS:
x The form, when filled out, reports follow-up information required by 42 U.S.C § 11004. Ensure that all information requested by the form is provided as completely as possible.
x If the incident involves reportable releases of more than one chemical, prepare one report form for each chemical released.
x If the incident involves a series of separate releases of chemical(s) at different times, the releases should be reported on separate reporting forms.

SPECIFIC INSTRUCTIONS:

Block A: Enter the name of the business and the name and phone number of a contact person who can provide detailed facility information concerning the release.

Block B: Enter the date of the incident and the time that verbal notification was made to OES. The OES control number is provided to the caller by OES at the time verbal notification is made. Enter this control number in the space provided.

Block C: Provide information pertaining to the location where the release occurred. Include the street address, the city or community, the county and the zip code.

Block D: Provide information concerning the specific chemical that was released.

Include the chemical or trade name and the Chemical Abstract Service (CAS) number. Check all categories that apply. Provide best available information on quantity, time and duration of the release.

Block E: Indicate all actions taken to respond to and contain the release as specified in 42 U.S.C. § 11004(c).

Block F: Check the categories that apply to the health effects that occurred or could result from the release. Provide an explanation or description of the effects in the space provided. Use Block H for additional comments/information if necessary to meet requirements specified in 42 U.S.C. § 11004(c).

Block G: Include information on the type of medical attention required for exposure to the chemical released. Indicate when and how this information was made available to individuals exposed and to medical personnel, if appropriate for the incident, as specified in 42 U.S.C. § 11004(c).

Block H: List any additional pertinent information.
133 / 352
ix Rev. 1/23/2024
Block I: Print or type the name of the facility representative submitting the report. Include the official signature and the date that the form was prepared.

MAIL THE COMPLETED REPORT TO:

Chemical Emergency Planning and Response Commission (CEPRC) / Attn: Section 304 Reports
Hazardous Materials Unit
3650 Shriever Avenue
Mather, CA 95655
NOTE: Authority cited: Sections 25503, 25503.1 and 25507.1, Health and Safety Code. Reference: Sections 25503(b)(4), 25503.1, 25507.1, 25518 and 25520, Health and Safety Code.
134 / 352
x Rev. 1/23/2024

EMERGENCY INCIDENT REPORTING FORM
(Post-Incident Reporting/Recording)
135 / 352
xi Rev. 1/23/2024
Page ___of ____
Facility Owner:

Name:_____________________________________________________________________ Address:___________________________________________________________________ Telephone #:________________________________________________________________ Facility:

Name:_____________________________________________________________________ Address:___________________________________________________________________ Telephone:_________________________________________________________________ Date of Incident: ___________________________________________________________ Time of Incident:_____________________________________________________________ Type of Incident (e.g. fire, explosion, etc.): ___________________________ Name & quantity of material(s) involved: __________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ ___________________________________________________________________ Extent of injuries, if any: _________________________________________________ _____________________________________________________________________________________ _________________________________________________________________________________ _____________________ ___
Assessment of actual or potential hazard to human health or the environment, if Applicable: _______________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ ___________________________________________________________________________ Estimated quantity and disposition of recovered material that resulted from the Incident:____________________________________________________________________________ _____________________________________________________________________________________ _______________________________________________________________________________ ___________________________________________________________________________________ Cause(s) of the incident:__________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ 136 / 352
xii Rev. 1/23/2024
_____________________________________________________________________________________ _____________________________________________________________________________________ _______________________________________________________________________ Actions taken in response to the incident:_________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _________________________________________________________________________ Administrative or engineering controls designed to prevent such incidents in the Future:______________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _______________________________________________________________________ ________________________________ ______________
Signature Date

137 / 352
xiii Rev. 1/23/2024
e • '
.
.

Subject:

CITY OF LAKEPORT

PUBLIC WORKS DEPARTMENT

STANDARD OPERATING PROCEDURE
Illicit Stormwater Discharge Detection, Response & Reportin;g Version Number: 3
SOP Number:

SOP-PW0l
Page Number:

Pal!e 1 of 2
Purpose:

Date Adopted: Date Revised:
3/ 3/ 2022 11/1/ 2023
Applies t o all storm drain conveyances that comprise the City of lakeport's Municipal.

Separ:ate Storm Sewer System (MS4) .including traditional storm drain inlets, pipes and culverts plus all connected conveyances such as ditches, open. channels and seasonal cree.ks or drainages. In Lakeport, all MS4 outfalls: drain into Clear Lake.

The purpose of this procedure is to identify and address any illicit discharges detected during MS4 outfall' inspections or other.vise reported illicit discharges impacting the storm sewer system, related conveyances or Cle,ar Lake.

An i llicit discharge is defined as any discharge t o tbe City's MS4, or t o natural surface water.;, that is not composed entirely of stormw,ater.

Responsibil ity: The Compliance Officer, Publi"C Works Director o.r Utilities Director shall be responsible References:

BACKGROUND:
for any future revisions t o·this SOP.

1. CASQA BMP WM-4 Spill Prevention and Control (2009)

2. Lake County d ean Water Program Illicit Disc harge Investigation and Reporting Proce-dures Guide (Updated April 2023)

3. staff M emo (2021) re: Identifying Illicit Discharges and Illicit Connections The City of Lakeport has a permit from the California State Water Resources Control Board to operate. a MS4. This permit aut horizes -the City to discharge stormwater into Clear lake pursuant to the State's Stormwater M anagement Program. The City has also adopted regulations that prevent the illicit discharge of non·stormwater materials to the MS4:
lakeport /',lunicipa/ Code Sectioq 8,40,110 Prohibited Storm.voter Discharges:

A. It is unlawfi,J f or.any person, to discharge or cause to be discharged any stormwoter or material that causes or contribut es t o causing the city t o violate water quality standards_, the city's obligations under tlie municipal stormwat er permit, or any state- issued discharge permit. (Ord. 853 §1 (part), 2006)
Lakeport Municipal Code Section 8.20.050 Dumping in streC1ms It Is unlawf ul for any person to dump any junki refusei garbage, dirt or any other material in any stream, creek, watercourse or streambedi or 'Within the banks of the same, or in the waters of Clear Lakei in the cityi 'Without Writt en permission t o do so from the director of public works, (Ord. 392 § 7,1963}
SOP-PW01 llticit Discharge Oe-tecti on, Response & Reporting l ( Page
138 / 352
xiv Rev. 1/23/2024

CITY OF LAKEPORT

PUBLIC WORKS DEPARTMENT

STANDARD OPERATING PROCEDURE
Illicit discharges can contribute high levels of pollutants to waterbodies. Pollutants commonly found in illicit discharges include raw sewage (viruses and bacteria), heavy metals, toxics, o il and grease, solvents, and nutrients. Pollutant levels from these illicit discharges can be high enough to significantly degrade water quality and threaten aquatic, w ildlife, and human health.

IDENTIFYING ILLICIT DISCHARGES AND CONNNECTIONS:

See attached memorandum that provides details for identifying Illicit Discharges and Illicit Connections to the City's MS4.

LAKEPORT STAFF PROCEDURE:

1. Upon verification of an llllclt Discharge, either during a routine MS4 1nspecr1011 or the result of t he investigation of a complaint or report of a potential discharge, immedia tely report the violation to your supervisor who will evaluate the situation and initiate cleanup procedures if deemed necessary.

2. Take photos of Illicit Discharge and impacted areas prior to initiating clean-up activities.

3. Refer to the attached CASO/\ Spill Prevention and Control BMP for spill control procedures.

Members of the Public Works Department have received advanced HAZWOPER training including specialized water-based HazMat Spill Response training.

4. If deemed necessary, City staff shall use spil l mitigation materials stored in the City's Spill Response Trailer to control the Illicit Discharge. All mitigation materials used in a spill response shall be logged/tracked by City staff and replaced ASAP to m aintain adequate stock in the trailer.

5. Supervisors:
a) Contact Compliance Otficer ASAP who will initiate all required Illicit Discharge reporting tasks.
b) Contact Public Works Director if Compliance Officer is unavailable. c) Refer to the attached Lake County Clean Water Program Illicit Dischar.ge Investigation and Reporti ng Procedures Guide for reporting protocols, including requirement to contact Lake County Environmental Health and the CalOES Warning Center and prepare and submit a written follow up report.

Attachments: All Referenced Materials on Page 1
SOP4 PW01 Illicit Ois<hairee Oetectlon. Response & Reporting ' I P •ee
Ron Ladd
Public Works Director
139 / 352
xv Rev. 1/23/2024
Spill Prevention and Control
Description and Purpose
Prevent or reduce the discharge of pollutants to drainage systems or watercourses from leaks and spills by reducing the chance for spills, stopping the source of spills, containing and cleaning up spills, properly disposing of spill materials, and training employees.

This best management practice covers only spill prevention and control. However, WM-1, Materials Delivery and Storage, and WM-2, Material Use, also contain useful information, particularly on spill prevention. For information on wastes, see the waste management BMPs in this section.

Suitable Applications
This BMP is suitable for all construction projects. Spill control procedures are implemented anytime chemicals or hazardous substances are stored on the construction site, including the following materials:
■ Soil stabilizers/binders
■ Dust palliatives
■ Herbicides
■ Growth inhibitors
■ Fertilizers
■ Deicing/anti-icing chemicals
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
WM-4
Categories
EC Erosioo Control
SE Sediment Con1rol
TC T racki'lg Control
WE Vfind Erosion Control
NS N~tomrNater
Managernenl Control
\W War,eM,,,agementand 0 Materials PollJ.ion Convd
Legend:
@' Primary Objective
!fl Secondary Objective
Targeted Constituents
Sedimem 0
Nutrien1s 0
Trash 0
Metals @'
Bacteria
Oil and Grease @
Organics 0
Potential Alternatives
None
Ill
C\UfOll.loV. ST0 IIMW,\TIA
"
1 ol 6
140 / 352
xvi Rev. 1/23/2024
Spill Prevention and Control WM-4
■ Fuels
■ Lubricants
■ Other petroleum distillates
Limitations
■ In some cases it may be necessary to use a private spill cleanup company. ■ This BMP applies to spills caused by the contractor and subcontractors. ■ Procedures and practices presented in this BMP are general. Contractor should identify appropriate practices for the specific materials used or stored onsite Implementation
The following steps will help reduce the storm water impacts of leaks and spills:

Education
■ Be aware that different materials pollute in different amounts. Make sure that each employee knows what a "significant spill" is for each material they use, and what is the appropriate response for "significant• and "insignificant• spills. ■ Educate employees and subcontractors on potential dangers to humans and the environment from spills and leaks.
■ Hold regular meetings to discuss and reinforce appropriate rusposal procedures (incorporate into regular safety meetings).
■ Establish a continuing education program to indoctrinate new employees. ■ Have contractor's superintendent or representative oversee and enforce proper spill prevention and control measures.

General Measures
■ To the extent that the work can be accomplished safely, spills of oil, petroleum products, substances listed under 40 CFR p.arts 110,117 , and 302, and sanitary and septic wastes should be contained and cleaned up immediately.
■ Store hazardous materials and wa,stes in covered containers and protect from vandalism. ■ Place a stock-pile of spill cleanup materials where it will be readily accessible. ■ Train employees in spill prevention and cleanup.
■ Designate responsible individuals. to oversee and enforce control measures. ■ Spills should be covered and protected from stormwater runon during rainfall to the extent that it doesn't compromise clean lllp activities.
■ Do not bury or wash spills "~th water.

November 2009 California Stormwater BMP Handbook
Construction
www.casqa,org
2 ol 6
141 / 352
xvii Rev. 1/23/2024
Spill Prevention and Control WM-4
■ Store and dispose of used clean up materials, contaminated materials, and recovered spill material that is no longer suitable for the intended purpose in conformance with the provisions in applicable BMPs.
■ Do not allow water used for cleaning and decontamination to enter stornn drains or watercourses. Collect and dispose of contaminated water in accordance "~th WM-10, Liquid Waste Management.
■ Contain water overflow or minor water spillage and do not allow it to discharge into drainage facilities or watercourses.
■ Place proper storage, cleanup, and spill reporting instructions for hazardous materials :stored or used on the project site in an open, conspicuous, and accessible location. ■ Keep waste storage areas clean, well organized, and equipped with ample cleanup supplies as appropriate for the materials being stored. Perimeter controls, containment structures, ,covers, and liners should be repaired or replaced as needed to maintain proper function.

Cleanup
■ Clean up leaks and spills immediately.
■ Use a rag for small spills on paved surfaces, a damp mop for general cleanup, and absorbent material for larger spills. If the spilled material is hazardous, then the used cleanup materials are also hazardous and must be sent to either a certified laundxy (rags) or disposed of as hazardous waste.
■ Never hose down or bury dry material spills. Clean up as much of the material as possible and dispose of properly. See the waste management BMPs in this section for specific information.
llfittor Spills
■ Minor spills typically involve small quantities of oil, gasoline, paint, etc. which can be ,controlled by the first responder at the discovery of the spill. ■ Use absorbent materials on small spills rather than hosing down or burying the spill. ■ Absorbent materials should be promptly removed and disposed of prope rly. ■ Follow the practice below for a minor spill:
- Contain the spread of the spill.
- Recover spilled materials.
- Clean the contaminated area and properly dispose of contaminated materials.

Semi-Significant Spills
■ Semi-significant spills still can be co:ntrolled by the first responder along: with the aid of other personnel such as laborers and the foreman, etc. This response may require the ,cessation of all other activities.

Novemb•r 2009 Galifomia Stomwat~r BMP Handbook
Construction
www.casqa.org
3 of 6
142 / 352
xviii Rev. 1/23/2024
Spill Prevention and Control WM-4
■ Spills should be cleaned up immediately:

Contain spread of the spill.

Notify the projed foreman immediately.

If the spill occurs on paved or impermeable surfaces, clean up using "dry" methods (absorbent materials, cat litter and/or rags). Contain the spill by encircling with absorbent materials and do not let the spill spread widely.

If the spill occurs in dirt areas, immeruately contain the spill by constructing an earthen ruke. Dig up and pr,operly dispose of contaminated soil.

If the spill occurs during rain, cover spill with tarps or other material to prevent contaminating runoff.

Sig11ijica11tfHazardous Spills
■ For significant or hazardous spills that cannot be controlled by personnel in the immediate vicinity, the following steps should be taken:

Notify the local emergency response by waling 911. In adrution to 911, the contractor will notify the proper county officials. It is the contractor's responsibility to have all emergency phone numbers at the construction site.

Notify the Governor's Office of Emergency Services Warning Center, (916) 845-8911.

For spills of federal reportable quantities, in conformance with the requirements in 40 CFR parts 110,119, and 302, the contractor should notify the National Response Center at (800) 424-8802.

Notification should first be made by telephone and followed up ,-~th a written report.

The services of a spills contractor or a Haz-Mat team should be obtained immediately.

Construction personnel should not attempt to clean up until the appropriate and qualified staffs have arrived at the job site.

Other agencies which may need to be consulted include, but are not limited to, the Fire Department, the Public Works Department, the Coast Guard, the Highway Patrol, the City/ County Police Department, Department of Toxic Substances, California Division of Oil and Gas, Cal/OSHA, etc.

Reporting
■ Report significant spills to local agencies, such as the Fire Department; they can assist in cleanup.
■ Federal regulations require that any significant oil spill into a water body or onto an adjoining shoreline be reported to the National Response Center (NRC) at 800-424-8802 (24 hours).

Use the follo,-~ng measures related to specific activities:

November 2009 Califom ia Stormwater BMP Handbook
Construction
www.casqa.org
4 ol 6
143 / 352
xix Rev. 1/23/2024
Spill Prevention and Control WM-4
Vehicle and Equipment Maintenance
• If maintenance must oecur onsite, use a designated area and a secondary containment, located away from drainage courses, to prevent the runon of stormwater and the runoff of spills.
■ Regularly inspect onsie vehicles and equipment for leaks and repair immeruately ■ Check incoming vehicles and equipment (inclurung delivery trucks, and employee and subcontractor vehicles) for leaking oil and fluids. Do not allow leaking vehicles or equipment onsite.
■ Always use secondary containment, such as a drain pan or drop cloth, to catch spills or leaks when removing or changing fluids.
■ Place drip ?ans or absorbent materials under paving equipment when not in use. ■ Use absorbent materials on small spills rather than hosing down or barying the spill. Remove the absorbent materials promptly and ruspose of properly. ■ Promptly transfer used fluids to the proper waste or recycling drums. Don't leave full drip pans or other open containers lying around
■ Oil filters disposed of in trashcans or dumpsters can leak oil and pollute stormwater. Place the oil filter in a funnel over a waste oil-recycling drum to drain excess oil before rusposal.

Oil filters can also be recycled. Ask the oil supplier or recycler about recycling oil filters. ■ Store cracked batteries in a non-leaking secondary container. Do this with all cracked batteries even if you think all the acid has drained out. If you drop a battery, treat it as if it is r.r.::ir:kP.ci. Pnt 1t 1nto thP. r:ont.::iinmP..nt .1rP;:i until yon .1rP. !.nrP. it 1~ not l~.1klne.

Vehicle a nd Equipment Fueling
■ If fueling must occur onsite, use designate areas, located away from drainage courses, to prevent the runon of stormwater and the runoff of spills. ■ Discourage "topping off' of fuel tanks.
■ Always use secondary containment, such as a drain pan, when fueling to catch spills/ leaks.

Costs
Prevention of leaks and spills is inexpensive. Treatment and/ or rusposal of contaminated soil or water can b~ quite e1.11ensive.

I nspection and Maintenance
■ Inspect and verify that activity- based BMPs are in place prior to the commencement of associated activities. While activities associated "~th the BMP are under way, inspect weekly during the rainy season and of two-week intervals in the non-rainy season to verify continued BMP implementation.
■ Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur.

November 2009 Califomia Stormwater BMP Handbook
Construction
www.casqa.org
S ol 6
144 / 352
xx Rev. 1/23/2024
Spill Prevention and Control WM-4
■ Keep ample supplies of spill control and cleanup materials onsite, near storage, unloading, and maintenance areas. ■ Update your spill prevention and control plan and stock cleanup materials as changes occur in the types of chemicals onsite.

References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995.

Stormwater Quality Handbooks -Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000.

Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992.

November 2009 Califomia Stormwater BMP Handbook
Construction
www.casqa.org
6 ol 6
145 / 352
xxi Rev. 1/23/2024
Lake
Illicit D
County
ischa
Procedures
rge
Clean
Investigation
Water
&
Program
Reporting "!!!!!!!"' ~
As part of the MS4 Storm Water Phase II Section E.9.d permit requirements, Lake County Clean Water Program (Lake County Watershed Protection District and the Cities of Lakeport and Clearlake) needs to maintain the Illicit Oiseharge Detection and Elimination Program to detect, investigate. and eliminate illicit diseharges.

Section E.9.d describes the specific investigative and reporting requirements that are needed to comply with all State MS4 regulations. These include written procedures for conducting investigations. reporting, and follow-up investigations of all non-storm water discharges suspected to be illicit. These procedures should also include corrective action procedures that are warranted, have been taken, or are being conducted.

Procedures for investigating. reporting. and conducting follow-up on an illicit discharge in Lake County.
1) If you or your department is the first response on the scene of an illicit discharge and/or spill. make sure there are no immediate threats or dangers to human health.

If an emergency situation exists call 911 and if there are potential health hazards or exposures to human health and/or Wildlife, call Environmental Health at (707)263-1 164.
2) Report the incidence to CalOES using the yellow pocket guide shown in Figure 1.

The CalOES Warning Center Phone# is (800)852-7550 or (916)845-891 1 3) The CalOES report will require the following information:
a. Identity of caller
b. Exact location, date and time of spill, release or threatened release
c. Location of threatened or involved waterway or storm drains d. Substance, quantity involved, and isotope if necessary e. Chemical name (if known, it should be reported if the chemical is extremely hazardous)
f. Description of what happened
4) Using the same inforrmation as provided in the CalOES report, complete a Lake County CWP I ODE Investigation Report.
5) If a CWP representative is not the first response to the Illicit e Ca/OES ..,.. ... , ... co - ....... _ ...... .. c ... m(lrnio na,ar..lou• Milk~
$rill/ !kit•
~otliieu lo'IG Gwda11«
Figure 1. CalOES
Spilt Response
Pocket Guide Book
Discharge I Spill, a "Lake County CWP IDDE Investigation Report" form must be filled out within 72 hours.
146 / 352
xxii Rev. 1/23/2024
5) If a CWP representative is not the first response to the Illicit Discharge / Spill, a "Lake County CWP IDDE Investigation Report" fonn must be filled out within 72 hours.
6) File a hard copy of the report in the labeled draw in Water Resource Department and if possible. staple a copy of the CalOES report to the IDDE Investigation Report.
7) If necessary, conduct a Follow-Up report on the incident using the "Lake County CWP IDDE Follow-Up" Form.
8) Send all reports and foll.ow up documents to the appropriate parties. These might include the following:

Lake County Cleall Water Program Illicit Qischarge Detection and Elimination Program Reporting Contacts (as of April 2023)
Department Name Email
Environmental Health Craig Wethemee, Director [email protected] Environmental Health Katie Carpenter, Office
Services Super,isor
Health Admu1istration Jonathan Portney, Health
Services Director
Special Districts Scott Harter, Administrator
Emergency Ser,ices Leah Sautelet, Emergency
Services Manaae<
Central Valley Regional Water Quality Elizabeth Lee, Slorm Water Control Board, Municipal Storm Water Resource Control Engineer Untt Phone numbers (2023):

LC Environmental Health: 707-263-1 164
LC Public Health: 707-263-1090
LC Special Districts: 707-263-01 19
LC OES: 707-262-4090
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
CVRWQCB: 916-464-3291 (Rancho Cordova office)
W:MS4 Permit/Illicit Discharges/Forms Updated April 2023 147 / 352
xxiii Rev. 1/23/2024
(i Lake County Clean Water Program
Illicit Discharge Investigation Reporting Form
CalOES incident ID: Original incident date:

Investigation date: Incident time:

Investigation by (name & dept):

Loeation of discharge:

Municipality: a Lake County a Lakeport a Clearlake a Oaks a Kelsei~ille a Other Responsible party:
(N>rM) (Compaoy)
~
~
Cl.UN'. WAIU P-&OGRAM
AM/PM
{Address) (Phone)
Category: a Food Service a CUPA 6 Commercial - Olher a Developmenl a Agriculture a General Publie a Municipal Operalioos a Other
Activity:
a Construction/Grading a Automotive 6 Surface Cleaning a Food Service a Landscaping a Agriculture 6 Illegal Dumping a Illicit Connection a Creek Work a Regular Operalions a Other Pollutant: a None a Hazardous aSedimenl a Soap a OiVGrease a Concrete a Organic Matter t:> Trash/Utter, a Sewage a Painl a Unknown 6 Other
Quantity: Notified to Environmental Health: a Yes a No a Unknown Entered waterbody: a Yes t:> No a Unknown Name of waterbody:

Observations:

Pictures: 6 Yes 6 No File #s
Enforcement action: a None 6 Verbal Warning 6 Citation 6 Admin. Order 6 Stop Work Order Date:

Corrective actions required:

Compliance date:

Abated: a Yes 6 No Date abated: Complainant advised: .!I. Yes a No a NIA Education materials provided: a Yes <1 No Description:

Sample: 6 Yes a No Analytes measured:

Referred to:

Name Depl Date
Referred to:

Name Depl Date
W:MS4 Permit/Illicit Discharges/Forms Updated April 2023 148 / 352
xxiv Rev. 1/23/2024
Lake County Clean Water Program
Illicit Discharge Follow-up Form
ClEAN WATER PROGRAM
Follow-up date:__ Time:. ___ _ CalOES control#: _____ _ Follow-up by (name, dept.): _____________________ _
Follow-up form (phone call, email, text,other): _______________ _ Date of original incident: _____________________ _
location of original discharge: ____________________ _
Responsible party: ________________________ _
Were pictures taken (if yes, file #s): __________________ _ Observations: _________________________ _
Actions recommended: ______________________ _
Disposition:

Abated: a Yes a No Was a sample taken: a Yes a No Analytes: _____ _ Sample results if any: ______________________ _
Follow up sent to: _____________________ _
Name Dept. Date
W:MS4 Permit/I/licit Discharges/Forms Updated April 2023 149 / 352
xxv Rev. 1/23/2024
Inter-Office Correspondence
DATE: March 3, 2022
TO: All Public Works Department Field Staff
FROM: Andrew Britton, Compliance Officer II
RE: Identifying Illicit Stormwater Discharges and Illicit Connections to City's MS4 Identifying Illicit Discharges
Lakeport's stormwater conveyance system {"MS4") includes traditional storm drain inlets, pipes and culverts along with other connected conveyances such as ditches, open channels and seasonal creeks or drainages. In Lakeport, all MS4 outfalls drain into Clear Lake.

For a variety of reasons liquids other than stormwater commonly enter the City's MS4.

Sometimes there is a misconception that t he water or other substance that enters the stormwater conveyance system will be treated and cleaned before it reaches our local waterbodies. However, this is not true. Anything that enters our MS4 will go directly to nearest waterbody and ultimately into Clear Lake which may cause serious environmental damage.

State regulations and the a ty's Municipal Code prohibits Illicit Discharges into the aty's stormwater system. Please see t he questions and answers below to learn more about illicit discharges and how to identify an illicit discharge.

What is an "illicit discharge" to a stormwater conveyance system?
An illicit discharge is any discharge to a stormwater conveyance system, drainage ditch, seasonal stream or other waterbody that is not composed entirely of stormwater. An illicit discharge could be the result of someone dumping a pollutant (automobile fluids, paint etc.) into the MS4; the result of an illicit connection into the cor.veyance system, such as a sewer pipe connected to a stormwater pipe; or a pipe that bypasses the sewer connection, producing a direct discharge into open channels or streams.

What is an "illicit connection" to a stormwater conveyance system?
An illicit connection is an improper physical connection of illicit discharges to the stormwater conveyance system. Examples include: a sewer pipe that is connected to the stormwater conveyance system t hat produces a continuous discharge of raw sewage to the conveyance 1 1 Page
150 / 352
xxvi Rev. 1/23/2024
system or a shop floor drain connected to the stormwater conveyance system producing a discharge of wash water or other pollution into the City's MS4.

What are the hazards associated with illicit discharges? Illicit discharges can contribute high levels of pollutants to waterbodies. Pollutants commonly found in illicit discharges include raw sewage (viruses and bacteria), heavy metals, toxics, oil and grease, solvents and nutrients. Pollutant levels from these illicit discharges have been shown in EPA studies to be high enough to significantly degrade water quality and threaten aquatic, wildlife and human health.

So how can you tell a normal stormwater discharge from an illicit discharge?
Dry weather flow is the best indication that the water coming from an outfall pipe is from an illicit connection. If it has not rained in at least three days and there is water coming from a stormwater outfall pipe, chances are that water is from an illegal source.

Although it is a gocd indication, dry weather flow is not always from an illicit source. Sometimes groundwater seeps into the stormwater conveyance system and is discharged through the outfall pipe. This isa natural source and is not illicit .

When should I report dry weather flow?
The best way to tell if the dry weather flow is an illicit discharge, and should be reported, is by examining the characteristics of the water being discharged.

1. Does the discharge have a distinct odor?
Some smells coming from an outfall pipe are an immediate indicator of an illicit discharge - for example~ a sewage~ gasoline, or chemical smell should be reported.

2. Is the water cloudy or full of sediment?
Gray wat er that should be treated at a sewage treatment plant may cause a cloudy appearance in the discharged water. A construction sit e wit hout proper stormwater best management practices could be discharging sediment to a storm drain. These conditions should be reported.

3. Is there anything floating in the discharge?
Soap suds and oil sheens are examples of floatables that may be found in an illicit di scharge.

These conditions should be reported.

4. What color is the discharge?
An abnorma ly colored discharge is a good indicat ion that there is an illicit coonection to t he MS4. However sometimes an abnormal color may have a nat ural cause. For ilst ance~ an orange discharge could be nat urally occurring from groundwater that is high in iron. However, if an abnormal color is coupled with another one of the characteristics listed here (odor~ floatables~ cloudiness, vegetative growth), tt should be reported.

5. Is there excessive vegetation around the outfall pipe? Exce.ssive vegetat ion around the outfall pipe as oppo sed to t he surrounding area is an indication of increased nutrients in the stormwater discharge. This could be from fertilizers or sewage in t he discharge and should be reported.
2 1 Page
151 / 352
Appendix 6.C
Spill/Overflow Emergency Response Plan (SERP/OERP) — August 2023 City of Lakeport Municipal Sewer District │ SSMP Revision 5 │ April 2026 Type: ATTACHED- PLACEHOLDER
Document follows this cover sheet.
152 / 352
City of Lakeport
Sewer Spill Emergency
Response Plan
Effective Date: August 3, 2023
Revised Date:

Approved by: Paul Harris, Utilities Director
Signature:

Date: August 3, 2023
Prepared by: David Patzer
DKF Solutions Group, LLC
[email protected]
© 2004-2023 DKF Solutions Group, LLC. All rights reserved.

This Spill Emergency Response Plan (SERP) is licensed to the City of Lakeport for internal use only beginning on the effective date listed above. All right, title and interest in the SERP, including without limitation, any copyright, shall remain with DKF Solutions Group, LLC. The City of Lakeport is granted a non-exclusive right to copy the SERP for use by City of Lakeport personnel only. The SERP as customized for the City of Lakeport is a public document and may be posted on the City’s website or otherwise presented in a non-editable format for public view. The SERP may not, in whole or in part, be shared in an editable format with another entity other than the City of Lakeport including, but not limited to, contractors, vendors, private companies, or other public agencies. In no case can the SERP be shared or posted online in an editable format. This document should not be construed as legal advice to any individual or agency that may use it. 153 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 2 of 43

TABLE OF CONTENTS

1. Purpose

2. Policy

3. Definitions as used in this Spill Emergency Response Plan

4. State Regulatory Requirements for Element 6, Spill Emergency Response Plan

5. Spill Emergency Response Plan Objectives

6. Spill Detection and Notification

7. Spill Response Procedures

8. Recovery and Cleanup

9. Water Quality

10. Notification, Reporting, Monitoring and Recordkeeping Requirements

11. Post-Spill Assessments of Spill Response Activities

12. Spill Response Training

13. Sewer Backup Into/Onto Private Property Claims Handling Policy

14. Authority

15. Appendices
A. Appendix A: Reporting Requirements by Spill Category B. Appendix B: Door Hanger
C. Appendix C: Sanitary Sewer Spill Response Instructions for Contractors D. Appendix D: Sanitary Sewer Spill/Backup Response Workbook Section 1:
o Workbook Instructions...................................................................A-1 o Contact Information ......................................................................... -2 o Key Definitions and Category Determination................................... -3 o Spill Event Checklist.......................................................................... -4 Section 2: Regulatory Reporting
o Regulatory Reporting Guide..................................................B-1 o Regulatory Reporting Log ....................................................... -2 Section 3: Flowchart ...................................................................................C-1 Section 4: Sanitary Sewer Spill Field Report ...............................................D-1 Section 5: Volume Estimation
o Volume Estimation Computations and Examples................. E-1 o Eyeball Estimation Method..................................................... -2 o Duration and Flow Rate Comparison Method ........................ -3 154 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 3 of 43 o Area/Volume Method............................................................. -4 o Upstream Connections Method.............................................. -5 o Drawing Worksheet ................................................................ -6 Section 6: Backup Forms
o Backup Forms Checklist ....................................................... F-1 o First Responder Form.............................................................. -2 o Declination of Cleaning Services............................................. -3 o Customer Information Letter.................................................. -4 o Your Responsibilities as a Private Property Owner................. -5 o Claim Form.............................................................................. -6 Section 7: Post Event
o Post-Spill Assessment ...........................................................G-1 o Collection System Failure Analysis.......................................... -2 155 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 4 of 43

1. PURPOSE
The purpose of the City of Lakeport Spill Emergency Response Plan (SERP) is to support a prompt, orderly and effective response to spills (sanitary), reduce spill volumes, and collect information for prevention of future spills. A “spill” in this document is defined, by State Water Board Order No. WQ 2022-0103-DWQ as a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure.

The SERP provides guidelines for City personnel to follow in responding to, cleaning up, reporting, and properly documenting spills that may occur within the City’s service area. This SERP satisfies the State Water Board Order No. WQ 2022-0103-DWQ, which require wastewater collection agencies to have a Spill Emergency Response Plan.

Additionally, the SERP outlines procedures for responding to sanitary sewer spill backups into structures as required by the City’s insurer. “Backup” is a term typically used by insurers to describe property damage resulting from exposure and contact to untreated or partially treated sewage.

2. POLICY
The City’s employees are required to report all spills from agency owned sewer mains and publicly owned laterals found and to take the appropriate action to secure the spill area, properly report to the appropriate regulatory agencies, relieve the cause of the spill, and ensure that the affected area is cleaned as soon as possible to minimize health hazards to the public and protect the environment. The City’s goal is to respond to sewer system spills as soon as possible following notification. The City will follow reporting procedures regarding sewer spills as set forth by the Central Valley Regional Water Quality Control Board and the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR).

3. DEFINITIONS AS USED IN THIS SERP
ANNUAL REPORT: An Annual Report (previously termed as Collection System Questionnaire in previous State Water Board Order No. 2006-0003-DWQ) is a mandatory report in which the City provides a calendar-year update of its efforts to prevent spills.

BASIN PLAN: A Basin Plan is a water quality control plan specific to a Regional Water Quality Control Board (Regional Water Board), that serves as regulations to: (1) define and designate beneficial uses of surface and groundwaters, (2) establish water quality objectives for protection of beneficial uses, and (3) provide implementation measures.

BENEFICIAL USES: The term “Beneficial Uses” is a Water Code term, defined as the uses of the waters of the State that may be protected against water quality degradation. Examples of beneficial uses include but are not limited to, municipal, domestic, agricultural, and industrial supply; power generation; recreation; aesthetic enjoyment; navigation; and preservation and enhancement of fish, wildlife, and other aquatic resources or preserves.

CALIFORNIA INTEGRATED WATER QUALITY SYSTEM (CIWQS): CIWQS is the statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.

DATA SUBMITTER: A Data Submitter is an individual designated and authorized by the City’s Legally Responsible Official to enter spill data into the online CIWQS Sanitary Sewer System Database. A Data Submitter does not have the authority of a Legally Responsible Official to certify reporting entered into the online CIWQS Sanitary Sewer System Database. 156 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 5 of 43 DRAINAGECONVEYANCE SYSTEM: A drainage conveyance system is a publicly- or privately-owned separate storm sewer system, including but not limited to drainage canals, channels, pipelines, pump stations, detention basins, infiltration basins/facilities, or other facilities constructed to transport stormwater and non-stormwater flows.

ENVIRONMENTALLY SENSITIVE AREA: An environmentally sensitive area is a designated agricultural and/or wildlife area identified to need special natural landscape protection due to its wildlife or historical value.

EXFILTRATION: Exfiltration is the underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.

FOG – Fats, Oils, and Grease: Refers to fats, oils, and grease typically associated with food preparation and cooking activities that can cause blockages in the sanitary sewer system.

HYDROLOGICALLY CONNECTED: Two waterbodies are hydrologically connected when one waterbody flows, or hasthe potential to flow, into the other waterbody. For the purpose of the SWRCB Order, groundwater is hydrologically connected to a surface water when the groundwater feeds into the surface water. See image, right. The surface waterbody in this example is termed a gaining stream as it gains flow from surrounding groundwater.

LATERAL (INCLUDING LOWER AND UPPER LATERAL): A lateral is an underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the City’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership. The City is typically responsible for lower lateral maintenance. A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations. An upper lateral isthe portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.

LEGALLY RESPONSIBLE OFFICIAL: A Legally Responsible Official is an official representative, designated by the City, with authority to sign and certify submitted information and documents required by State Water Board Order No. WQ 2022- 0103-DWQ (SSSWDR).

MAINLINE SEWER: Refers to City wastewater collection system piping downstream of the sewer laterals that is not a private sewer lateral connection to a building.

MAINTENANCE HOLE OR MANHOLE: Refers to an engineered structure that is intended to provide access to a sanitary sewer for maintenance and inspection
NOTIFICATION OF A SPILL: Refers to the time at which the City becomes aware of a spill event through observation or notification by the public or other source.

NUISANCE: For the purpose of the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), a nuisance, as defined in Water Code section 13050(m), is anything that meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property; Gaining Stream
Flowllnction
157 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 6 of 43 • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal; and • Occurs during, or as a result of, the treatment or disposal of wastes.

PREVENTATIVE MAINTENANCE: Refers to maintenance activities intended to prevent failures of the wastewater collection system facilities (e.g. cleaning, CCTV, inspection).

PRIVATE LATERAL SEWAGE SPILL – Spills that are caused by blockages or other problems within a privately-owned lateral.

PRIVATE SANITARY SEWER SYSTEM: A private sanitary sewer system is a sanitary sewer system of any size that is owned and/or operated by a private individual, company, corporation, or organization. A private sanitary sewer system may or may not connect into a publicly owned sanitary sewer system.

PRIVATE SEWER LATERAL: In Lakeport, upper laterals are typically privately owned and maintained. A private sewer lateral is the privately-owned lateral that transports sewage from private property(ies) into a sanitary sewer system.

POTENTIAL TO DISCHARGE, POTENTIAL DISCHARGE: Potential to Discharge, or Potential Discharge, means any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.

RECEIVING WATER: A receiving water is a water of the State that receives a discharge of waste.

SANITARY SEWER SYSTEM: A sanitary sewer system is a system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinentinfrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the City;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks, and diversion structures.

For purpose of the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), sanitary sewer systems include only systems owned and/or operated by the City.

SATELLITE SEWER SYSTEM: A satellite sewer system is a portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.

SEWAGE: Sewage, and its associated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

SEWER BACKUP: A sanitary sewer spill resulting from a sanitary sewer system overflow, operational failure, and/or infrastructure failure in a publicly owned sewer system, with an appearance point and subsequent discharge into a structure.

SPILL: A spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under the 158 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 7 of 43 State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.
• Category 1 Spill
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) that results in a discharge to:
o A surface water, including a surface water body that contains no flow or volume of water; or o A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.

A spill from a City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR).
• Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill.
• Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) that does not discharge to a surface water. A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill. • Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) that does not discharge to a surface water. A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

TRAINING: Training is in-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR).

WASH DOWN WATER: Wash down water is water used to clean a spill area.

WASTE: Waste, as defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal. 159 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 8 of 43 WATERS OF THE STATE: Waters of the State are surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions. Waters of the State include waters of the United States.

WATERS OF THE UNITED STATES: Waters of the United States are surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.

WATER QUALITY OBJECTIVE: A water quality objective is the limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance.

4. STATE REGULATORY REQUIREMENTS FOR ELEMENT 6, SPILL EMERGENCY RESPONSE PLAN The Sewer System Management Plan (SSMP) must include an up to date Spill Emergency Response Plan (SERP) to ensure prompt detection of and response to spills to reduce spill volumes and collect information for prevention of future spills.

The SERP must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; • Comply with the notification, monitoring and reporting requirements of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the SERP and are appropriately trained; • Address emergency system operations, traffic control and other necessary response activities; • Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system; • Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State; • Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; • Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR); and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update it as needed.

The Sewer System Management Plan is available to the public at https://www.cityoflakeport.com/public_works/sewer/sewer_system_management_plan_ssmp.php. 160 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 9 of 43

5. SPILL EMERGENCY RESPONSE PLAN OBJECTIVES
The Spill Emergency Response Plan includes measures to protect public health and the environment. The City willrespond to spills from its system(s) in a timely manner that minimizes water quality impacts and nuisance by:
• Immediately stopping the spill and preventing/minimizing a discharge to waters of the State; • Intercepting sewage flows to prevent/minimize spill volume discharged into waters of the State; • Thoroughly recovering, cleaning up and disposing of sewage and wash down water; and • Cleaning publicly accessible areas while preventing discharges to waters of the State.

Additionally, City Staff will:
• Work safely;
• Properly document each spill event in a separate file including photos and/or video where applicable; • Collect information for prevention of future spills;
• Minimize public contact with the spilled wastewater;
• Mitigate the impact of the spill;
• Meet the regulatory reporting requirements;
• Evaluate the causes of failure related to spills;
• Perform post-spill response evaluation for adherence to procedures and effectiveness of response; and • Revise response procedures, modify maintenance practices or provide additional training based on the results from the debrief and failure analysis of spills, if needed.

6. SPILL DETECTION AND NOTIFICATION
ref. State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), ATTACHMENT D, Element 6, Page D-6 The processes that are employed to notify the City of the occurrence of a spill include: observation by the public, receipt of an alarm, or observation by City staff during the normal course of their work.

6.1 LIFT STATION ALARMS
The City operates 8 wastewater lift stations. In the event of a station failure the SCADA alarm system is activated and the City is contacted. To prevent spills, wastewater from the wet well can either be pumped into a vacuum truck for disposal to a nearby sanitary sewer manhole or bypassed around the station into the sanitary sewer system.

6.2 PUBLIC OBSERVATION
Public observation is the most common way that the City is notified of blockages and spills. Contact numbers and information for reporting sewer spills and backups are on the City’s website: https://www.cityoflakeport.com/public_works/sewer/index.php. The City’s telephone number for reporting sewer problems is (707) 263-3578.
161 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 10 of 43 • Normal Work Hours: City Public Works Administrative Assistant will receive sewer service requests.

They will relay the callers information and nature of service request to the Public Works Supervisor or designee and they will dispatch an available crew. They will perform an investigation and note findings and any actions taken in Cartograph on a field tablet (2023). For spills, Public Works staff will complete the Spill Response Workbook.
• After Hours: After hours the number rolls over to an answering service and they will contact the Standby Employee. They will perform an investigation and note findings and any actions taken in Cartograph on a field tablet (2023). For spills, Public Works staff will complete the Spill Response Workbook.

When calls are received, either during normal work hours or after hours, the individual receiving the call will collect and include in the spill event file, at a minimum, the following information to record the complaint:
• Date, time, and method of notification,
• Date and time the complainant first noticed the spill, if available, • Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available, • Complainant’s contact information, if available, and
If the spill or backup is not in the City’s service area the individual receiving the call provides the customer with the contact information for the responsible agency, and then notifies that agency.

6.3 CITY STAFF OBSERVATION
City staff conducts periodic inspections of its sewer system facilities as part of their routine activities. Any problems noted with the sewer system facilities are reported to appropriate City staff that, in turn, responds to emergency situations. Work orders are issued to correct non-emergency conditions.

6.4 CONTRACTOR OBSERVATION
Contractors working on the City sewer system will be informed of contractor spill response procedures. Contractors working on behalf of property owners will be provided spill response information by Building Department when they pull a permit. The following procedures are to be followed in the event that a contractor/plumber causes or witnesses a sanitary sewer spill. If the contractor/plumber causes or witnesses a spill they should:

1. Immediately notify Lakeport Public Works at (707) 263-3578 and provide the following information if available:
a. Date, time contractor first noticed the spill
b. Description of the contractor’s observation, including any information regarding whether the spill has reached surface waters or a drainage conveyance system c. Contractor’s contact information

2. Protect storm drains.

3. Protect the public.

4. Direct ALL media and public relations requests to the Utilities Director. 162 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 11 of 43

6.5 NO OBSERVATION
If there are no witnesses or no call was received for a spill, the City staff will contact nearby residences or business owners in the vicinity of the spill, in an attempt to obtain information that brackets a given start time that the spill began. This information will be collected and documented on the Sanitary Sewer Spill Report in the Sanitary Sewer Spill/Backup Response Workbook.

7. SPILL RESPONSE PROCEDURES (Ref. State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), ATTACHMENT D Element 6 page D-6)

7.1 SEWER SPILL/BACKUP RESPONSE SUMMARY
The City will respond to spills as soon as feasible following notification of a spill/backup.

If it is not possible that the spill/backup is due to a failure in the City-owned/maintained sewer lines the Sewer Crew performs the following:
• Follows the instructions in the Sanitary Sewer Spill/Backup Response Workbook. • If the customer is not home the SEWER CREW completes the Door Hanger and leaves it on the customer’s door.
• If the customer is home the SEWER CREW:
o Explains that the blockage is in the customer’s lateral and the City does not have legal authority to maintain or perform work on privately owned laterals. o Recommends to the customer that they hire a licensed contractor to clear their line. o Gives the customer the Your Responsibilities as a Private Property Owner pages from the Sanitary Sewer Spill/Backup Response Workbook, see form F-5.

If it is possible that the spill/backup is due to a failure in the City-owned/maintained sewer lines the Sewer Crew:
• Follows the instructions in the Sanitary Sewer Spill/Backup Response Workbook. • Notifies Utilities Director or designee of the incident. • Relieves blockage and cleans impacted areas.
• Forwards the completed Sanitary Sewer Spill/Backup Response Workbook to the Utilities Director.

The Utilities Director or designee performs required regulatory reporting in accordance with the Sanitary Sewer Spill/Backup Response Workbook’s Regulatory Reporting section.

If the overflow has impacted private property, the Sewer Crew:
• Follows the instructions in the Sanitary Sewer Spill/Backup Response Workbook. • Provides the customer with forms and information as indicated in the Sanitary Sewer Spill/Backup Response Workbook. • Forwards the completed Sanitary Sewer Spill/Backup Response Workbook to the Utilities Director.

The Utilities Director notifies the City Clerk of incident. 163 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 12 of 43 The City Clerk or designee:
• Reviews incident reports, claim form and other incident information and forwards, as appropriate, to Sierra Pacific Loss Management.
• Communicates with claimant as appropriate.
• Communicates with Sierra Pacific Loss Management to adjust and administer the claim to closure. • Properly documents in writing all activities and communications before approving the final event file.

7.2 FIRST RESPONDER PRIORITIES
The first responder’s priorities are:
• Prompt response to spills.
• To follow safe work practices.
• To respond promptly with the appropriate and necessary equipment. • To reduce spill volume and contain the spill wherever feasible. • To restore the flow as soon as practicable.
• To minimize public access to and/or contact with the spilled sewage. • To promptly notify the Utilities Director in event of a spill needing additional resources, and/or impacting environmentally sensitive areas.
• To return the spilled sewage to the sewer system.
• To restore the area to its original condition (or as close as possible). Collect information for the prevention of future spills. • Properly document the spill and response activities on the forms provided in the Sanitary Sewer Spill/Backup Response Workbook, including photos and/or video where practicable.

7.3 SAFETY
The first responder is responsible for following safety procedures at all times. Special safety precautions must be observed when performing sewer work. There may be times when City personnel responding to a sewer system event are not familiar with potential safety hazards peculiar to sewer work. In such cases it is appropriate to take the time to discuss safety issues, consider the order of work, and check safety equipment before beginning response activities.

If the first responders encounter access restrictions or unsafe conditions that prevent its compliance with spill response requirements or monitoring requirements in State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), the City provides written documentation of access restrictions and/or safety hazards in the corresponding required report.

7.4 INITIAL RESPONSE
The first responder must respond to the site of the spill/backup and visually check for potential sewer stoppages.

The first responder will:
164 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 13 of 43 • Note arrival time at the site of the spill/backup.
• Verify the existence of a public sewer system spill or backup. • Identify and assess the affected area and extent of spill. • Assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools.
• Contact caller if time permits.
• Document the spill according to the requirements described in Section 10 of this SERP, including taking photos and/or videos of overflowing manhole(s)/cleanout(s). • Take steps to contain, recover, and return the spill to the sanitary sewer as feasible. For procedures refer to the Sanitary Sewer Spill/Backup Response Workbook.
• Protect surface waters to the extent practicable. For procedures refer to the Sanitary Sewer Spill/Backup Response Workbook.
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event.

7.5 INITIATE SPILL CONTAINMENT MEASURES
The first responder will attempt to contain as much of the spilled sewage as possible using the following steps:
• Determine the immediate destination of the overflowing sewage. • Plug storm drains using air plugs, sandbags, and/or plastic mats to contain the spill, whenever appropriate.

If spilled sewage has made contact with the storm drainage system, attempt to contain the spilled sewage by plugging downstream storm drainage facilities.
• Contain/direct the spilled sewage using dike/dam or sandbags. • Vacuum retrieve sewage whenever practicable.
• Pump around the blockage/pipe failure.

Containment efforts will be documented. For procedures refer to the Sanitary Sewer Spill/Backup Response Workbook.

7.6 RESTORE FLOW
Using the appropriate cleaning equipment, set up downstream of the blockage and hydro-clean upstream from a clear manhole. Attempt to remove the blockage from the system and observe the flows to ensure that the blockage does not reoccur downstream. If the blockage cannot be cleared within a reasonable time from arrival, or sewer requires construction repairs to restore flow, then initiate containment and/or bypass pumping. If other assistance is required, immediately contact the Utilities Director. For procedures refer to the Sanitary Sewer Spill/Backup Response Workbook.
165 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 14 of 43

7.7 EQUIPMENT
This section provides a list of specialized equipment that may be used to support this Spill Emergency Response Plan.
• Closed Circuit Television (CCTV) Inspection Unit – A CCTV Inspection Unit is required to determine the root cause for all spills from gravity sewers.
• Camera -- A digital or disposable camera (photo, video or phone) is required to record the conditions upon arrival, during clean up, and upon departure.
• Emergency Response Trucks -- A utility body pickup truck, or open bed is required to store and transport the equipment needed to effectively respond to sewer emergencies. The equipment and tools will include containment and clean up materials.
• Portable Generators, Portable Pumps, Piping, and Hoses – Equipment used to bypass pump, divert, or power equipment to mitigate a spill.
• Combination Sewer Cleaning Trucks -- Combination high velocity sewer cleaning trucks with vacuum tanks are required to clear blockages in gravity sewers, vacuum spilled sewage, and wash down the impacted area following the spill event.
• Rodding (snake) equipment for responding to lateral blockages. • Air plugs, sandbags and plastic mats
• Spill Sampling Kits
• Portable Lights
Standard operating procedures for equipment that may be necessary in the event of a sanitary sewer overflow or backup can be found in the City Server.

8. RECOVERY AND CLEANUP (Ref. State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), Element 6, ATTACHMENT D, Page D-6) The recovery and cleanup phase begins immediately after the flow has been restored and the spilled sewage has been contained to the extent possible. The spill recovery and cleanup procedures are described in the following sections.

8.1 ESTIMATE THE FLOW AND VOLUME OF SPILLED SEWAGE
A variety of approaches exist for estimating the volume of a sanitary sewer spill. The Sewer Crew members should use the method most appropriate to the sewer overflow in question and reference the Sanitary Sewer Spill/Backup Response Workbook which provides four (4) methods:
• Eyeball Estimation Method
• Duration and Flow Rate Calculation Method
166 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 15 of 43 • Area/Volume Method
• Upstream Connections Method
In addition, the following will be documented on the Sewer Spill Report form:

1. Description, photographs, and GPS coordinates of the system location where the spill originated. If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

2. Estimated total spill volume exiting the system;

3. Description and photographs of the extent of the spill and spill boundaries;

4. Did the spill reach a drainage conveyance system? If yes:
• Description of the drainage conveyance system transporting the spill; • Photographs of the drainage conveyance system entry location(s); • Estimated spill volume that reached the drainage conveyance system; • Estimated spill volume fully recovered from the drainage conveyance system; • Estimated spill volume remaining within the drainage conveyance system • Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; • Estimated spill travel time from the point of entry into the drainage conveyance system to the point of discharge into the receiving water.

5. Estimated total spill volume recovered.

8.2 RECOVERY OF SPILLED SEWAGE
Vacuum up and/or pump the spilled sewage and wash down water and discharge it back into the sanitary sewer system. Thoroughly recover and dispose of sewage and wash down water.

8.3 CLEAN-UP AND DISINFECTION
Clean up procedures will be implemented to reduce the potential for human health issues and adverse environmental impacts associated with a spill event. The procedures described are for dry weather conditions and will be modified as required for wet weather conditions. Where cleanup is beyond the capabilities of City staff, a cleanup contractor will be used.

Private Property
City crews are responsible for the cleanup when the property damage is minor in nature and is outside of private building dwellings, such as in front, side and backyards, easements, etc. In all other cases, affected property owners can call a water damage restoration contractor to complete the cleanup and restoration. If the overflow into property is the definite cause of City system failure, the property owner can call out a water damage restoration contractor to complete the cleanup and restoration. In both cases, property owners may submit a claim form.
167 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 16 of 43 Hard Surface Areas
Collect all signs of sewage solids and sewage-related material either by protected hand or with the use of rakes and brooms. Wash down the affected area with clean water and/or deozyme or similar nontoxic biodegradable surface disinfectant until the water runs clear. The flushing volume will be approximately three times the estimated volume of the spill. Take steps to contain and vacuum up the wastewater. Allow area to dry. Repeat the process if additional cleaning is required.

Landscaped and Unimproved Natural Vegetation
Collect all signs of sewage solids and sewage-related material either by protected hand or with the use of rakes and brooms. Wash down the affected area with clean water until the water runs clear. The flushing volume will be approximately three times the estimated volume of the spill. Either contain or vacuum up the wash water so that none is released. Allow the area to dry. Repeat the process if additional cleaning is required.

Natural Waterways
The Department of Fish and Wildlife will be notified by CalOES for spills greater than or equal to 1,000 gallons. For spills less than 1,000 gallons, contact Lake County Environmental Health for direction.

Wet Weather Modifications
Collect all signs of sewage solids and sewage-related material either by protected hand or with the use of rakes and brooms. Omit flushing and sampling during heavy storm events (i.e., sheet of rainwater across paved surfaces) with heavy runoff where flushing is not required and sampling would not provide meaningful results.

8.4 PUBLIC NOTIFICATION
Signs will be posted and barricades put in place to keep vehicles and pedestrians away from contact with spilled sewage. Lake County Environmental Health instructions and directions regarding placement and language of public warnings will be followed. Additionally, the Utilities Director or designee will use their best judgment regarding supplemental sign placement in order to protect the public and local environment. Signs will not be removed until directed by Lake County Environmental Health or the Utilities Director or designee.

Creeks, streams and beaches that have been contaminated as a result of a spill will be posted at visible access locations until the risk of contamination has subsided to acceptable background bacteria levels. Document the number and location of posted signs. The area and warning signs, once posted, will be checked every day to ensure that they are still in place. Photographs of sign placement will be taken.

In the event that an overflow occurs at night, the location will be inspected first thing the following day. The field crew will look for any signs of sewage solids and sewage-related material that may warrant additional cleanup activities.

When contact with the local media is deemed necessary, the Utilities Director or their designee will provide the media with all relevant information.
168 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 17 of 43

9. WATER QUALITY (Ref. State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), Element 6, Attachment A - DEFINITIONs page A-5, Attachment E1 2.3 through 2.4 pages E1-5 through E1-8)

9.1 SURFACE WATERS OF CONCERN
The following waters of the State are in the City’s service area:
• Clear Lake
• Forbes Creek

9.2 WATER QUALITY SAMPLING AND TESTING
For sewage spills in which an estimated 50,000 gallons or greater are discharged into a surface water, the City or designee will conduct the following water quality sampling as soon as possible but no later than 18 hours after the City’s knowledge of a potential discharge to a surface water. Collect one water sample, each day of the duration of the spill, at:
• The DCS-001 location as described in section 9.5 (Receiving Water Sampling Locations) below, if sewage discharges to a surface water via a drainage conveyance system; and/or • Each of the three receiving water sampling locations in section 9.5 (Receiving Water Sampling Locations) below;
If the receiving water has no flow during the duration of the spill, the City must report “No Sampling Due To No Flow” for its receiving water sampling locations.

The lab staff will collect water quality samples in accordance with State Water Board Order No. WQ 2022-0103- DWQ (SSSWDR).

The lab staff collecting the samples will complete the Chain of Custody prior to transferring ownership of the samples to the Clear Lake Environmental Research Center (CLERC) Lab.

The Clear Lake Environmental Research Center (CLERC) Lab shall analyze the collected receiving water samples for the following constituents:
• Ammonia, and
• E. coli:
o Amendment to the Basin Plan for Bacteria
Updates the water quality objectives for bacteria to use an E. coli pathogen indicator rather than fecal coliform. Status: Adopted by the Regional Board on 6 September 2002 in Resolution No.

R5-2002-0150. This Amendment was not submitted for approvals due to a similar, concurrent state-wide effort. Updated state-wide bacteria water quality objectives are included in the State Water Resources Control Board's Part 3 of the Water Quality Control Plan for Inland Surface Waters, Enclosed Bays, and Estuaries of California, Bacteria Provisions and a Water Quality Standards Variance Policy (https://www.waterboards.ca.gov/bacterialobjectives/docs/bacteria.pdf), effective 4 February 2019
o Sacramento River and San Joaquin River: In waters designated for contact recreation (REC-1), the fecal coliform concentration based on a minimum of not less than five samples for any 30-day 169 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 18 of 43 period shall not exceed a geometric mean of 200/100 ml, nor shall more than ten percent of the total number of samples taken during any 30-day period exceed 400/100 ml. o For Folsom Lake (50), the fecal coliform concentration based on a minimum of not less than five samples for any 30-day period, shall not exceed a geometric mean of 100/100 ml, nor shall more than ten percent of the total number of samples taken during any 30-day period exceed 200/100 ml.
o Tulare Lake: In waters designated REC-1, the fecal coliform concentration based on a minimum of not less than five samples for any 30-day period shall not exceed a geometric mean of 200/100 ml, nor shall more than ten percent of the total number of samples taken during any 30-day period exceed 400/100 ml.

Dependent on the receiving water(s), sampling of bacterial indicators shall be sufficient to determine post-spill (after the spill) compliance with the water quality objectives and bacterial standards of the California Ocean Plan or the California Inland Surface Water Enclosed Bays, and Estuaries Plan, including the frequency and/or number of post-spill receiving water samples as may be specified in the applicable plans.

The City or designee shall collect and analyze additional samples as required by the applicable Regional Water Board Executive Officer or designee.

9.3 LAB SELECTION
Analytical Lab
Samples collected for spill response and background monitoring purposes will be analyzed at Clear Lake Environmental Research Center (CLERC) Lab, which is accredited through the California State Water Resources Control Board Environmental Laboratory Accreditation Program (ELAP). ELAP provides evaluation and accreditation of environmental testing laboratories to ensure the quality of analytical data used for regulatory purposes to meet the requirements of the State's drinking water, wastewater, shellfish, food, and hazardous waste programs. The State agencies that monitor the environment use the analytical data from these accredited labs. The ELAP-accredited laboratories have demonstrated capability to analyze environmental samples using approved methods.

Getting Samples to the Lab
At all times, sample hold times identified below will be observed in accordance with the following:

Analytical
Parameter
Maximum
Holding Time
Required
Container
Type
Required Preservative
Minimum
Amount
Ammonia (NH3 as N);
SM 4500NH3 B/C or B/G
28 days Plastic / Glass H2SO4 pH <2 +0-6°C 200 mL
Coliform, Total / E.Coli;
SM 9223 B (Present/Absent or Quantitray)
8 hours Plastic (sterile) Na2S2O3 + 0-10°C;
No regulatory temp.
req. for DW
100 mL
Once samples are collected, they will be transported by City staff or designee to the lab to be processed.

9.4 WATER QUALITY ANALYSIS SPECIFICATIONS
Spill monitoring must be representative of the monitored activity (40 Code of Federal Regulations section 122.41(j)(1)).
170 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 19 of 43 Sufficiently Sensitive Methods
Sample analysis must be conducted according to sufficiently sensitive test methods approved under 40 Code of Federal Regulations Part 136 for the sample analysis of pollutants. For the purposes of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), a method is sufficiently sensitive when the minimum level of the analytical method approved under 40 Code of Federal Regulations Part 136 is at or below the receiving water pollutant criteria.

Environmental Laboratory Accreditation Program-Accredited Laboratories The analysis of water quality samples required per State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) must be performed by a laboratory that has accreditation pursuant to Article 3 (commencing with section 100825) of Chapter 4 of Part 1 of Division 101 of the Health and Safety Code. (Water Code section 13176(a).) The State Water Board accredits laboratories through its Environmental Laboratory Accreditation Program (ELAP).

9.5 RECEIVING WATER SAMPLING LOCATIONS
Receiving water samples shall be collected at the following locations.

Sampling of Flow in Drainage Conveyance System (DCS) Prior to Discharge Sampling Location Sampling Location Description
DCS-001 A point in a drainage conveyance system before the drainage conveyance system flow discharges into a receiving water.

Receiving Surface Water Sampling (RSW)1
Sampling Location Sampling Location Description
RSW-001:

Point of Discharge
A point in the receiving water where sewage initially enters the receiving water.

RSW-001U:

Upstreamof Point of
Discharge
A point in the receiving water, upstream of the point of sewage discharge, to capture ambient conditions absent of sewage discharge impacts.

RSW-001D:

Downstream of
Point ofDischarge
A point in the receiving water, downstream of the point of sewage discharge, where the spill material is fully mixed with the receiving water.

9.6 STREAM VELOCITY MEASUREMENTS
If sampling is performed after the spill has stopped, the velocity of the impacted surface water must be determined to estimate spill travel time and select an accurate Downstream sample location. One way to measure the spill travel time is to use a velocity probe (such as a Global Water FP111-S Flow Probe) to determine the rate of 1 The City must use its best professional judgment to determine the upstream and downstream distances based on receiving water flow, accessibility to upstream/downstream waterbody banks, and size of visible sewage plume. 171 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 20 of 43 flow in the water body. In cases where a water velocity probe is used, the manufacturer’s instructions will be followed.

9.7 SAMPLE TYPES
Grab Samples
Grab samples are appropriate for the characterization of surface waters at a particular time and place, to provide information about minimum and maximum concentrations, and to allow for the collection of variable sample volume.

Grab samples may be collected directly into the sample container, or a clean decontaminated intermediate container may be used if a wading sample is not possible or safe. If an intermediate container is used, when in the field, double rinse the sampling device (bucket, automatic sampler) with sample water prior to collecting the sample and be sure to discard rinse water downstream of where sample will be collected. If samples are collected in a bucket and distributed into a consolidation collection container, swirl the contents of the bucket as it is being poured into the consolidation collection container to avoid settling of solids (and pour in back-and-forth pattern – e.g., 1-2-3-3-2-1).
• Grab Sample: A grab sample is defined as an individual sample collected at a given time. Grab samples represent only the condition that exists at the time the sample is collected (US EPA 1977). • Surface Grab Sample: A sample collected at the water surface (i.e., skimming) directly into the sample container or into an intermediate container such as a clean bucket. A single or discrete sample collected at a single location.

Field Blanks
Field Blanks are used to evaluate the potential for contamination of a sample by site contaminants from a source not associated with the sample collected (e.g., airborne dust, etc.). Sterile, deionized water is taken into the field in a sealed container. This is the stock water. The stock water is then poured into the sample container. The containers and sample submission forms are labeled as “Field Blank.” The same template selected for the test samples should be used. Field blanks are subject to the same holding time limitations as samples. The appropriate FIELD QC box on the sample Chain of Custody form should be checked.

9.8 SAMPLE LABELING AND CHAIN OF CUSTODY PROCEDURES
At a minimum, the following grab samples will be collected:
• Field Blank: See Section 9.7 for discussion.
• Upstream: A point in the receiving water, upstream of the point of sewage discharge, to capture ambient conditions absent of sewage discharge impacts. • Source: A point in the receiving water where sewage initially enters the receiving water. See Section 9.6 for information on determining velocity of the surface water in order to determine the Source sample location.
• “Downstream” of spill: A point in the receiving water, downstream of the point of sewage discharge, where the spill material is fully mixed with the receiving water. This location will vary with the velocity of the surface water to be sampled (see Section 9.6). 172 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 21 of 43 • A point in a drainage conveyance system before the drainage conveyance system flow discharges into a receiving water.

Sample labels shall be completed for each sample, using waterproof ink.

Photos or video of each sample location will be taken, properly labeled with date, time, and view direction and a map of the photo locations completed. Photos and videos shall include relevant landmarks to identify sampling locations and their surroundings.

Due to the evidentiary nature of samples collected during enforcement investigations, possession must be traceable from the time the samples are collected until they are analyzed. To maintain and document sample possession, a Surface Water Sample Chain of Custody Record (see Sewer Spill/Backup Response Workbook) must be completed. A sample is under custody if:
• It is in your possession, or
• It is in your view, after being in your possession, or • It was in your possession and under your control to prevent tampering, or • It is in a designated secure area.

As few people as possible should handle samples. The person taking the samples is personally responsible for the care and custody of the samples collected until they are transferred or dispatched properly.

Samples are accompanied by a chain of custody record. When transferring the possession of samples, the individuals relinquishing and receiving will sign, date, and note the time on the record. This record documents sample custody transfer from the sampler, often through another person, to the analyst at the laboratory. The samples are typically transferred to the sample-receiving custodian at the laboratory.

9.9 SPILL TECHNICAL REPORT: Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water
For any spill in which 50,000 gallons or greater discharged into a surface water, within 45 calendar days of the spill end date, the Legally Responible Official shall submit a Spill Technical Report to the online CIWQS Sanitary Sewer System Database. The Spill Technical Report, at minimum, must include the following information:

1. Spill causes and circumstances, including at minimum:
• Complete and detailed explanation of how and when the spill was discovered; • Photographs illustrating the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions; • Diagram showing the spill failure point, appearance point(s), the spill flow path, and ultimate destinations;
• Detailed description of the methodology employed, and available data used to calculate the discharge volume and, if applicable, the recovered spill volume; • Detailed description of the spill cause(s);
• Description of the pipe material, and estimated age of the pipe material, at the failure location; • Description of the impact of the spill;
• Copy of original field crew records used to document the spill; and 173 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 22 of 43 • Historical maintenance records for the failure location.

2. City’s response to the spill:
• Chronological narrative description of all actions taken by the City to terminate the spill; • Explanation of how the Sewer System Management Plan Spill Emergency Response Plan was implemented to respond to and mitigate the spill; and
• Final corrective action(s) completed and a schedule for planned corrective actions, including:
o Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable,
o Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences, and o Necessary modifications to the Emergency Spill Response Plan to incorporate lessons learned in responding to and mitigating the spill.

3. Water Quality Monitoring, including at minimum:
• Description of all water quality sampling activities conducted; • List of pollutant and parameters monitored, sampled and analyzed; as required in Section 9.2. • Laboratory results, including laboratory reports;
• Detailed location map illustrating all water quality sampling points; and • Other regulatory agencies receiving sample results (if applicable).

5. Evaluation of spill impact(s), including a description of short-term and long-term impact(s) to beneficial uses of the surface water.

10. NOTIFICATION, REPORTING, MONITORING AND RECORDKEEPING REQUIREMENTS ref. ORDER WQ 2022-0103-DWQ Attachment E-1 and E-2

10.1 REPORTING REQUIREMENTS
All reporting required in State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR) must be submitted electronically to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov), unless specified otherwise in State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR). Electronic reporting may solely be conducted by a Legally Responsible Official or Data Submitter(s) previously designated by the Legally Responsible Official, as required in section 5.8 (Designation of Data Submitters) of the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR).

The City shall report any information that is protected by the Homeland Security Act, by email to [email protected], with a brief explanation of the protection provided by the Homeland Security Act for the subject report to be protected from unauthorized disclosure and/or public access, and for official Water Board regulatory purposes only.

Refer to APPENDIX A for detailed reporting requirements by spill category. 174 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 23 of 43

10.2 REGULATOR REQUIRED NOTIFICATIONS

10.2.1 Spill Category 1: Spills to Surface Waters
Spill Requirement Due Method
Notification Within two (2) hours of the City’s
knowledge of a Category 1 spill of 1,000 gallons or greater, discharging or threatening to discharge to surface waters notify the
California Office of Emergency Services and
obtain a notification control number.

CaliforniaOffice of Emergency
Services at: (800) 852-7550
(Section 1 of Attachment E1
of the State Water Board Order No. WQ 2022-0103-DWQ
(SSSWDR))
Monitoring • Conduct spill-specific monitoring;
• Conduct water quality sampling of the
receiving water within 18 hours of initial
knowledge of spill of 50,000 gallons or
greater to surface waters.
(Section 2 of Attachment E1
of the State Water Board Order No. WQ 2022-0103-DWQ
(SSSWDR))
Reporting • Submit Draft Spill Report within three
(3) business days ofthe City’s knowledge
of the spill;
• Submit Certified Spill Report within 15
calendar days of the spill end date;
• Submit Technical Report within 45 calendar days after the spill end date for a Category 1 spill in which 50,000 gallons
or greater discharged to surface waters;
and
• Submit Amended Spill Report within 90
calendar days after the spill end date.
(Section 3.1 of Attachment E1
of the State Water Board Order No. WQ 2022-0103-DWQ
(SSSWDR))

10.2.2 Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters Spill Requirements Due Method
Notification Within two (2) hours of the City’s
knowledge of a Category 2 spill of 1,000 gallons or greater threatening to discharge to waters of the State: Notify California Office
of Emergency Services and obtain a notification control number.

CaliforniaOffice of Emergency Services at: (800) 852-
7550
(Section 1 of Attachment E1
of the State Water Board Order No. WQ 2022-0103-

DWQ (SSSWDR))
Monitoring Conductspill-specific monitoring. (Section 2 of Attachment E1 of the State Water Board Order No. WQ 2022-0103-

DWQ (SSSWDR))
175 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 24 of 43 Reporting • Submit Draft Spill Report within three
(3) business days of the City’s
knowledge of the spill;
• Submit Certified Spill Report within 15
calendar days of the spill end date; and
• Submit Amended Spill Report within 90
calendar days after the spill end date.
(Section 3.2 of Attachment
E1 of the State Water Board
Order No. WQ 2022-0103-

DWQ (SSSWDR))

10.2.3 Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters
Spill Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring. (Section 2 of Attachment E1 of the State Water Board Order No. WQ 2022-0103-DWQ
(SSSWDR))
Reporting • Submit monthly Certified Spill Report
to the online CIWQS Sanitary Sewer
System Database within 30 calendars
days after the end of the month in
which the spills occur; and
• Submit Amended Spill Reports within 90
calendar days after the Certified Spill
Report due date.
(Section 3.3 and 3.5 of Attachment E1 of the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR))

10.2.4 Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters Spill Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conductspill-specific monitoring. (Section 2 of Attachment E1 of the State Water Board Order No. WQ 2022-0103-DWQ
(SSSWDR))
Reporting • If, during any calendar month, Category 4 spills occur, certify monthly, the estimated total spill volume exiting the
sanitary sewer system, and the total
number of all Category 4 spills into the
online CIWQS Sanitary Sewer System
Database, within 30 days after the end
of the calendar month in which the
spills occurred.
• Upload and certify a report, in an acceptable digital format, of all Category 4 spills to the online CIWQS Sanitary
(Section 3.4, 3.6, 3.7 and 4.4
of Attachment E1 of the State
Water Board Order No. WQ
2022-0103-DWQ (SSSWDR))
176 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 25 of 43 Sewer System Database, by February
1st after the end of the calendar year
in which the spills occur.

10.2.5 City Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters Spill Requirements Due Method
Notification Within two (2) hours of the City’s
knowledge of a spill of 1,000 gallons or
greater, from an City- owned and/or operated lateral, discharging or threatening to discharge to waters of the State:

Notify California Office of Emergency Services and obtain a notification control number.

Not applicable to a spill of less than 1,000
gallons.

California Office of Emergency Services at: (800) 852- 7550
(Section 1 of Attachment E1
of the State Water Board Order No. WQ 2022-0103-

DWQ (SSSWDR))
Monitoring Conduct visual monitoring. (Section 2 of Attachment E1 of the State Water Board ORDER WQ 2022-0103-DWQ)
Reporting • Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not discharge to a surface water) to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occur.
• Report a lateral spill of any volume
that discharges to a surface water as a
Category 1 spill.
(Sections 3.6, 3.7 and 4.4 of
Attachment E1 of the State
Water Board Order No. WQ
2022-0103-DWQ (SSSWDR))

10.3 COMPLAINT RECORDS
The City maintains records of all complaints received whether or not they result in sanitary sewer overflows.

These complaint records include, but are not limited to, records documenting how the City responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
• Date, time, and method of notification,
• Date and time the complainant first noticed the spill, if available, 177 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 26 of 43 • Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available, • Complainant’s contact information, if available, and
• Final resolution of the complaint;
All complaint records will be maintained for a minimum of five years in Cartograph whether or not they result in a spill. Spill files (field notes, spill/Backup Response Workbook) are kept on the City server.

11. POST-SPILL ASSESSMENTS OF SPILL RESPONSE ACTIVITIES (ref. State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), Element 6, ATTACHMENT D, Page D-6) Every spill event is an opportunity to evaluate the City adherence to response and reporting procedures and effectiveness of the response. Each spill event is unique, with its own elements and challenges including volume, cause, location, terrain, climate, and other parameters.

As soon as possible after spill events all the participants, from the person who received the call to the last person to leave the site, will meet to review the procedures used and to discuss what worked and where improvements could be made in responding to and mitigating future spill events. The results of the debriefing will be documented and tracked to ensure the action items are completed as scheduled.

11.1 FAILURE ANALYSIS INVESTIGATION
The objective of the failure analysis investigation is to determine the “root cause” of the spill and to identify corrective action(s) needed that will reduce or eliminate future potential for the spill to recur or for other spills to occur.

The investigation will include reviewing all relevant data to determine appropriate corrective action(s) for the line segment. The investigation may include:
• Reviewing and completing the Sanitary Sewer Spill Report and any other documents related to the incident • Reviewing the incident timeline and other documentation regarding the incident • Reviewing communications with the reporting party and witness • Reviewing volume estimate, volume recovered estimate, volume estimation assumptions and associated drawings
• Reviewing available photographs
• Interviewing staff that responded to the spill
• Reviewing past maintenance records
• Reviewing past CCTV records,
• Conducting a CCTV inspection to determine the condition of all line segments immediately following the spill and reviewing the video and logs,
• Reviewing any Fats, Roots, Oils, and Grease (FROG) related information or results 178 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 27 of 43 • Post spill debrief records
• Interviews with the public at the spill location
The product of the failure analysis investigation will be the determination of the root cause and the identification and scheduling of the corrective actions. The Collection System Failure Analysis Form (in Sanitary Sewer Spill/Backup Response Workbook) will be used to document the investigation.

12. SPILL RESPONSE TRAINING
(ref. State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), Element 6, Attachment D 4.3 page D-5 and Element 6 page D-6
This section provides information on the training that is required to support this Spill Emergency Response Plan.

12.1 INITIAL AND ANNUAL REFRESHER TRAINING
All City personnel who may have a role in responding to, reporting, and/or mitigating a sewer system spill will receive training on the contents of this SERP. All new employees will receive training before they are placed in a position where they may have to respond. Current employees will receive annual refresher training on this SERP and the procedures to be followed. The City will document all training.

Affected employees will receive annual training on the following topics by knowledgeable trainers:
• The requirements of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), Element 6 • The City’s Spill Emergency Response Plan procedures and practice drills • Containment and cleanup methods
• Researching and documenting Sanitary Sewer Spill Start Times • Skilled estimation of spill volume for field operators • Electronic CIWQS reporting procedures for staff submitting data • State Water Resources Control Board Employee Knowledge Expectations Through SWRCB Employee Knowledge Expectations training, the employee will be able to answer the following:

1. Please briefly describe your name and job title.

2. Please describe for us approximately when you started in this field and how long you have worked for your agency.

3. Please expand on your current position duties and role in responding in the field to any spill complaints.

4. Please describe your SOPs used to respond/mitigate spills when they occur.

5. Describe any training your agency provides or sends you to for conducting spill volume estimates. 179 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 28 of 43

6. We are interested in learning more about how your historical spill response activities have worked in the field. We understand from discussions with management earlier that you use the SERP from the SSMP. Please elaborate on how you implement and utilize the procedures in the plan.

7. Historically, before any recent changes, can you please walk us through how you would typically receive and respond to any spill complaints in the field?

8. Can you tell us who is responsible for estimating spill volumes discharged? If it is you, please describe how you go about estimating the spill volume that you record on the work order/service request forms?

9. What other information do you collect or record other than what is written on the work order form?

10. Describe if and when you ever talk with people that call in spills (either onsite or via telephone) to further check out when the spill might have occurred based on what they or others know? If you do this, can you tell us where this information is recorded?

11. We understand you may be instructed to take pictures of some sewer spills/backups into structures. Other than these spills, when else would you typically take any pictures of a spill?

12. Please walk us through anything else you’d like to add to help us better understand how your field crews respond and mitigate spill complaints.

12.2 SPILL RESPONSE DRILLS
Periodic training drills or field exercises will be held to ensure that employees are up to date on these procedures, equipment is in working order, and the required materials are readily available. The training drills will cover scenarios typically observed during sewer related emergencies (e.g. mainline blockage, mainline failure, and lateral blockage). The results and the observations during the drills will be recorded and action items will be tracked to ensure completion.

12.3 SPILL TRAINING RECORD KEEPING
Records will be kept of all training that is provided in support of this SERP for 5 years. The records for all scheduled training courses and for each overflow emergency response training event will include date, time, place, content, name of trainer(s), names and titles of attendees, brief narrative description of the training, including training method(s) and training materials and/or equipment used.

12.4 CONTRACTORS WORKING ON CITY SEWER FACILITIES
All contractors working on City sewer facilities will be required to follow the spill response instructions on the Sanitary Sewer Spill Response Instructions for Contractors (Appendix C). Additional training may be required depending on the nature of the work on any or all of the following:
• The requirements of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR), Element 6 • Communication procedures to City in the event a spill is caused or witnessed • The City’s Spill Emergency Response Plan procedures and practice drills 180 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 29 of 43 • Skilled estimation of spill volume for field operators • Electronic CIWQS reporting procedures for staff submitting data

13. SEWER BACKUP INTO/ONTO PRIVATE PROPERTY CLAIMS HANDLING POLICY It is the policy of the City that a claims form shall be offered to anyone wishing to file a claim. The following procedures will be observed for all sewer overflows/backups into/onto private property:
• City staff will offer a City claim form irrespective of fault whenever it is possible that the sanitary sewer backup may have resulted from an apparent blockage in the City-owned sewer lines or whenever a City customer requests a claim form. The claim may later be rejected if subsequent investigations into the cause of the loss indicate the City was not at fault. • It is the responsibility of the SEWER CREW to gather information regarding the incident and notify the Utilities Director or their designee.
• It is the responsibility of the City Clerk or their designee to review all claims and to oversee the adjustment and administration of the claim to closure.

14. AUTHORITY
This SERP is written in accordance with the State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR).

15. APPENDICES
A. Reporting Requirements by Spill Category
B. Door Hanger
C. Sanitary Sewer Spill Response Instructions for Contractors D. Sanitary Sewer Spill/Backup Response Workbook
181 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 30 of 43 APPENDIX A:

Reporting Requirements by Spill Category
182 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 31 of 43 REPORTING REQUIREMENTS FOR INDIVIDUAL CATEGORY 1 SPILL REPORTING Draft Spill Report
Within three (3) business days of the City’s knowledge of a Category 1 spill, any spill amount with discharge to surface waters or drainage conveyance system that discharges to surface waters and is not captured/recovered, the City shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the City was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the City notified the CaliforniaOffice of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated; If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
a. Description of the drainage conveyance system transporting the spill; b. Photographs of the drainage conveyance system entry location(s); c. Estimated spill volume fully recovered from the drainage conveyance system; d. Estimated spill volume remaining within the drainage conveyance system; e. Description and photographs of all discharge point(s) into the surface water; f. Estimated spill volume that discharged to surface waters; and g. Estimated total spill volume recovered.

Certified Spill Report
Within 15 calendar days of the spill end date, the City shall submit a Certified Spill Report for Category 1 spills, to the online CIWQS Sanitary Sewer System Database.

Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.
183 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 32 of 43 (Category 1 continued)
The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
a. The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and
b. The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, lateral, pump station, etc.);

6. Description of the pipe material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description ofspillresponse activitiesincluding description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion;

14. Name and type of receiving water body(s);

15. Description of the water body(s), including but not limited to:
a. Observed impacts on aquatic life,
b. Public closure, restricted public access, temporary restricted use, and/or posted health warnings due to spill,
c. Responsible entity for closing/restricting use of water body, and d. Number of days closed/restricted as a result of the spill.

16. Whether or not the spill was located within 1,000 feet of a municipal surface water intake; and

17. If water quality samples were collected, identify sample locations and the parametersthe water quality samples were analyzed for. If no samples were taken, Not Applicable shall be selected. 184 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 33 of 43 (Category 1 continued)
Amended Certified Spill Reports
The City shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the City shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date. 185 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 34 of 43 REPORTING REQUIREMENTS FOR INDIVIDUAL CATEGORY 2 SPILL REPORTING Draft Spill Report
Within three (3) business days of the City’s knowledge of a Category 2 spill, spills of 1,000 gallons or more; no discharge to surface waters or drainage conveyances, the City shallsubmit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the City was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the City notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated; If a single spill event resultsin multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
• Description of the drainage conveyance system transporting the spill; • Photographs of the drainage conveyance system entry location(s); • Estimated spill volume fully recovered from the drainage conveyance system; • Estimated spill volume remaining within the drainage conveyance system;

11. Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; and

12. Estimated total spill volume recovered.

Certified Spill Report
Within 15 calendar days of the spill end date, the City shall submit a Certified Spill Report for the Category 2 spill, to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov). Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;
186 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 35 of 43 (Category 2 continued)

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
• The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and
• The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, pump station, etc.);

6. Description of the pipe/infrastructure material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description ofspill response activitiesincluding description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion; and

14. Whether or not the spill was located within 1,000 feet of a municipal surface water intake.

Amended Certified Spill Reports
The City shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the City shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date. 187 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 36 of 43 REPORTING REQUIREMENTS FOR INDIVIDUAL CATEGORY 3 SPILL REPORTING Monthly Certified Spill Reporting
The City shall report and certify all Category 3, spills of 50 gallons or more and less than 1,000 gallons; no discharge to surface waters or drainage conveyances, spills to the online CIWQS Sanitary Sewer System Database within 30 calendar days after the end of the month in which the spills occurred. (For example, all Category 3 spills occurring in the month of February shall be reported and certified by March 30th). After the Legally Responsible Official certifies the spills, the online CIWQS Sanitary Sewer System Database will issue a spill event identification number for each spill.

The monthly reporting of all Category 3 spills must include the following items for each spill:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the City was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Description, photographs, and GPS coordinates where the spill originated. If a single spill event results in multiple appearance points, provide GPS coordinatesforthe appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

7. Estimated total spill volume exiting the system;

8. Description and photographs of the extent of the spill and spill boundaries;

9. Did the spill reach a drainage conveyance system? If Yes:
a. Description of the drainage conveyance system transporting the spill; b. Photographs of the drainage conveyance system entry locations(s); c. Estimated spill volume fully recovered from the drainage conveyance system; and d. Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable.

10. Estimated total spill volume recovered;

11. Description of the spill event destination(s), including GPS coordinates, if available, that represent the full spread and reaches of the spill;

12. Spill end date and time;

13. Description of how the spill volume estimations were calculated, including, at minimum:
a. The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and b. The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

14. Spill cause(s) (for example, root intrusion, grease deposition, etc.); 188 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 37 of 43 (Category 3 Continued)

15. System failure location (for example, main, pump station, etc.);

16. Description of the pipe/infrastructure material, and estimated age of the pipe/infrastructure material, at the failure location;

17. Description of the impact of the spill;

18. Whether or not the spill was associated with a storm event;

19. Description of spill response activities including description of immediate spill containment and cleanup efforts;

20. Description of spill corrective actions, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of the major milestones for those steps; including, at minimum:
a. Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable, and
b. Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences at the same spill event location, including:
§ Adjusted schedule/method of preventive maintenance,
§ Planned rehabilitation or replacement of sanitary sewer asset, § Inspected, repaired asset(s), or replaced defective asset(s), § Capital improvements,
§ Documentation verifying immediately implemented system modifications and operating/maintenance modifications, § Description of spill response activities,
§ Spill response completion date, and
§ Ongoing investigation efforts, and expected completion date of investigation to determine the full cause of spill;

21. Detailed narrative of investigation and investigation findings of cause of spill.

Amended Certified Spill Reports
Within 90 calendar days of the certified Spill Report due date, the City may update or add additional information to a certified Spill Report by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the Legally Responsible Official shall contact the State Water Board at [email protected] to request to amend a certified Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the 90-day timeframe for amending the certified Spill Report, as provided above. 189 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 38 of 43 REPORTING REQUIREMENTS FOR INDIVIDUAL CATEGORY 4 SPILL REPORTING Monthly Certified Spill Reporting
The City shall report and certify the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills, spills less than 50 gallons; no discharge to surface waters or drainage conveyances, to the online CIWQS Sanitary Sewer System Database, within 30 calendar days after the end of the month in which the spills occurred.

Annual Certified Spill Reporting of Category 4 and/or Lateral Spills For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the City shall:
• Maintain records persection 4.4. of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR). The City shall provide records upon request by State Water Board or Regional Water Board staff. • Annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.

A spill from an City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR).

Monthly Certification of “No-Spills” Or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” If either (1) no spills occur during a calendar month or (2) only Category 4, and/or City-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the City shall certify, within 30 calendar days after the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually (per section 3.6 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of State Water Board Order No. WQ 2022-0103-DWQ (SSSWDR)) for the designated month.

If a spill starts in one calendar month and ends in a subsequent calendar month, and the City has no further spills of any category, in the subsequent calendar month, the City shall certify “no-spills” for the subsequent calendar month.

If the City has no spills from its systems during a calendar month, but the City voluntarily reported a spill from a private lateral or a private system, the City shall certify “no-spills” for that calendar month.

If the Citys has spills from its owned and/or operated laterals during a calendar month, the City shall not certify “no spills” for that calendar month.
190 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 39 of 43 APPENDIX B:

Door Hanger
191 / 352
On (date)
at (location)
we responded to a reported blockage of the
sanitary sewer service to your property.

We discovered a blockage in:
o The sanitary sewer main and cleared
the line
o Your sanitary sewer lateral, which is
your responsibility to maintain.

If you require assistance to clear your portion
of the lateral you can search the internet for
“Sewer Contractors” or “Plumbing Drains &
Sewer Cleaning.” If you plan to hire a contractor, we recommend getting estimates from more than one company.

City representative notes:

City representative name:

For questions or comments, please call
City of Lakeport
(707) 263-3578
City of Lakeport
On (date)
at (location)
we responded to a reported blockage of the
sanitary sewer service to your property.

We discovered a blockage in:
o The sanitary sewer main and cleared the
line
o Your sanitary sewer lateral, which is your
responsibility to maintain.

If you require assistance to clear your portion
of the lateral you can search the internet for
“Sewer Contractors” or “Plumbing Drains &
Sewer Cleaning.” If you plan to hire a contractor, we recommend getting estimates from more than one company.

City representative notes:

City representative name:

For questions or comments, please call
City of Lakeport
(707) 263-3578
City of Lakeport
(
I
I
\
\
I
)
\
I
J
l 192 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 41 of 43 APPENDIX C:

Sewer Spill Response Instructions for Contractors
193 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved.

City of Lakeport
Spill Emergency Response Plan
Sewer Spill Response Instructions for Contractors
For contractors working on the sanitary sewer system the City expects them to have, at all worksites, spill response materials necessary to block drainage conveyance system entry points near the work area and surface waters.

Additionally, contractor must be trained on spill response materials and equipment.

The following procedures are to be followed in the event that a contractor/plumber causes or witnesses a sanitary sewer spill. If the contractor/plumber causes or witnesses a spill they should:
1 Immediately notify the City at (707) 263-3578 and provide the following information if available:
• Date, time contractor first noticed the spill
• Description of the contractor’s observation, including any information regarding whether the spill has reached surface waters or a drainage conveyance system
• Contractor’s contact information
â
2 Protect storm drains.
â
3 Protect the public.
â
4 Direct ALL media and public relations requests to the Utilities Director at (707) 263-3578 ext. 402.
194 / 352
City of Lakeport
Spill Emergency Response Plan 7-27-23
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Page 43 of 43 APPENDIX D:

Sewer Spill/Backup Response Workbook
195 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport
Sewer Spill Emergency Response Plan
Sewer Spill/Backup Response
Workbook
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. .,aaENC)'
I --- I I .,.
• i;:
• a
4~
~ ..
0'-ur,011• 6
196 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 INSERT TAB:

Tab A: Start Here
197 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan A-1
Sanitary Sewer Spill/Backup Response Workbook
See the following page for contact information as needed. o Make immediate notifications:
o If this spill is discharging or threatening to discharge greater than or equal to 1,000 gallons to waters of the State, immediately contact the Compliance Officer or Utilities Director who will notify CalOES at (800) 852-7550 within 2 hours and obtain a control number. Record this number on the following pages:

A-4, B-2, and D-1 Page 1.
o If there is a backup into a residence/business that may be due to a problem in the City’s sewer, notify the Utilities Director at (707) 263-3578 ext. 402.
o For media inquiries/requests contact the Utilities Director at (707) 263-3578 ext. 402. o Refer to the Regulatory Reporting Guide in this Workbook for additional reporting requirements.

SEWER CREW: CHAIN OF CUSTODY
o Follow the instructions on the Spill/Backup Response Flowchart and complete forms in this Workbook as indicated.
o Complete the chain of custody record (to the right) and deliver this workbook to the Utilities Director.

Print Name:

Initial:

Date:

UTILITIES DIRECTOR:
o Review the Spill Event Checklist (A-4) and the forms in this Workbook. Contact the Sewer Crew for additional information if necessary.
o Confirm that all required regulatory notifications have been made (B-1). o If this was a Sewer Backup, follow instructions on the Backup Forms Checklist (F-1). o Complete the Post Spill Assessment (G-1) and Collection System Failure Analysis Form (G-2).
o Complete the Chain of Custody record (right) and forward Workbook to Data Submitter

CHAIN OF

CUSTODY
Print Name:

Initial:

Date:

DATA SUBMITTER: CHAIN OF CUSTODY
o Refer to Spill Event Checklist (A-4) Data Submitter Responsibilities o Complete the chain of custody record (to the right) and deliver this workbook to a Legally Responsible Official (see A-2 for LROs).

Print Name:

Initial:

Date:

LEGALLY RESPONSIBLE OFFICIAL: CHAIN OF CUSTODY
o Refer to Spill Event Checklist (A-4) Data Submitter Responsibilities o Complete the chain of custody record (to the right) and file this Workbook with the spill file.

Print Name:

Initial:

Date:
198 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Contact Information A-2
Contact Description Telephone/Email/Address
CAL/OES California Office of Emergency
Services
(800) 852-7550
Utilities Director Media inquiries/requests
CalOES 2-hour notification and
other regulatory notifications
Outside Assistance / Mutual Aid
Utilities Director at (707) 263-3578
ext. 402
Clear Lake Environmental Research
Center (CLERC)
Water quality sample analysis CLERC Lab and Office (Lakeport Carnegie Library)
200 Park Street
Lakeport, CA 95453
1-707-850-0650
Central Valley Regional Water
Quality Control Board
c/o Guy Childs
Notifications (916) 464-4648
Lake County Air Quality
Management District
Notifications (707) 263-7000
Lake County Environmental Health o Notifications
o Sign placement guidance
(707) 263-1164
Sierra Pacific Loss Management Assistance with sewer backup customers
(800) 413-2999 / (707) 252-5525
[email protected]
State Water Resources Control
Board
Walter Mobley (916) 323-0878
[email protected]
Authorized Personnel:

The following are authorized to perform regulatory reporting of spills:

Job Title Telephone Check if LRO
Utilities Director (707) 263-3578
Ext. 402 ✔
Compliance Officer (707) 263-3578
Ext. 403
Public Works Director (707) 263-3578
Ext. 401
The City’s Legally Responsible Official (LRO) is authorized to electronically sign and certify spill reports in CIWQS. The LRO is the Utilities Director.
199 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Key Definitions & Category Determination A-3: Page 1
NOTE: All references to “SSWDR” refer to State Water Board Order No. WQ 2022-0103-DWQ.

DRAINAGE CONVEYANCE SYSTEM: A drainage conveyance system is a publicly- or privately-owned separate storm sewer system, including but not limited to drainage canals, channels, pipelines, pump stations, detention basins, infiltration basins/facilities, or other facilities constructed to transport stormwater and non-stormwater flows.

SPILL: A spill is a discharge ofsewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under SSWDR if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State. • Category 1 Spill:

A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under SSWDR that results in a discharge to:
o A surface water, including a surface water body that contains no flow or volume of water; or o A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.

A spill from an City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of SSWDR.
• Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under SSWDR that does not discharge to a surface water. A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill. • Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under SSWDR that does not discharge to a surface water. A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill. • Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under SSWDR that does not discharge to a surface water. A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

WATERS OF THE STATE: Waters of the State are surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses.

Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions. Waters of the State include waters of the United States.
200 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Key Definitions & Category Determination A-3: Page 2
INSTRUCTIONS: Answer each question in order and stop at the red box once you have determined the category.

Did the spill result in a discharge to surface water, including a surface water body that contains no flow or volume of water? YES
NO
Did the spill result in a discharge to a drainage
conveyance system that discharges to surface water?
Does the drainage conveyance system discharge to a
dedicated stormwater infiltration basin or facility?
Category
1 Spill
YES
YES
NO
NO
Less than 50
gallons
Category
4 Spill
Between 50 gallons
and 999 gallons
Category
3 Spill
1,000 gallons or
greater
Category
2 Spill
Was the sewage spill from or caused by the City’s
sanitary sewer system, which is regulated under the
Sanitary Sewer Systems General Order?
The City is not required to report
spills that are not from or caused
by its regulated sewer system.

NO
YES
Was the sewage in the drainage conveyance system
fully captured and returned to the sanitary sewer
system or disposed of properly?
What is the estimated spill volume?
YES
NO
201 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Spill Event Checklist A-4
Date of Spill: Spill Location/Name:

CIWQS Event ID #: Category? £ 1 £ 2 £3 £4 OES#:

Property Damage? £ Yes £ No Service Request #:

SEWER CREW RESPONSIBILITIES
o Effort made to contain and return a portion/all to the sanitary sewer
o Pictures/video taken of spill
o Pictures taken of affected/unaffected area
o If property damage, start that process
o Pictures taken of containment efforts
o If spill is Cat 1 > 1000 gallons or Cat 2 > 1000 gal
threatening to discharge to waters of the State:

OES Control #
o Were surface waters impacted?
o Impacted waters identified?
o Assess and document spill location and spread
including photos
o Spill Report Form Complete (includes fields for all
required fields in CIWQS, and a sketch of spill)
o Volume Estimation Worksheet(s) done
o Start Time Determination Form done
o Follow Water Quality Monitoring and Sampling
procedures

UTILITIES DIRECTOR RESPONSIBILITIES
o Map of where samples were taken, if applicable
o For Cat 1 Spills 50,000 gallons or larger, obtain sampling results
o Ensure Technical Report is written
o Initial review of forms is complete (ensure
consistency of dates, times, volumes, and other data)
o Review of photos and videos (label/date)
o Conduct Post Spill Assessment & complete form (G-1)
o Failure Analysis
o TV to determine cause
o Review Asset History
o Determine next steps to prevent recurrence
o Document findings and next steps on Spill Report
o Start folder for all documentation for this spill event. Put everything in it (Spill Report, Field Reports, Worksheets/Forms, follow-up work orders, notes, photos, drawings, CIWQS print outs, emails, etc.)

DATA SUBMITTER RESPONSIBILITIES
o Submit Draft in CIWQS w/in 3 business days (for
Categories 1 and 2 only)
o Print CIWQS Draft hard copy and email
o Review CIWQS, spill Report, Worksheets, CMMS, and
any other documentation to ensure data is consistent
(e.g. dates, times, volumes, cause, follow-up action, etc. o Attach photos, forms etc. to CIWQS
o Attach Technical Report to CIWQS, if applicable
o Submit Ready to Certify in CIWQS (with sufficient time for LRO review)
o Print CIWQS Ready to Certify and email
o Hand Workbook to LRO and complete Chain of Custody
form

LRO RESPONSIBILITIES
o LRO review Workbook and CIWQS verify accurate and
consistent data
o Certify in CIWQS (within 15 calendar days for
Categories 1 & 2, 30 days after the month for Category
3 & 4)
o Print Certified CIWQS and email
o Any changes? Change in CIWQS and hard copies and
explain changes, print out current version
o Move completed Workbook and spill folder to spill files o If any changes are made to SSMP
o Update SSMP and link on CIWQS to SSMP
o Add change to SSMP Change Log
o Consider need to re-certify SSMP
202 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 INSERT TAB:

Tab B: Regulatory Reporting
203 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Regulatory Reporting Guide B-1: Page 1
The City’s Legally Responsible Officials (LROs) are authorized to electronically sign and certify spill reports in CIWQS. See contact information for LROs on page A-2.

Deadline Category 1 Spill* Category 2 Spill++ Category 3 Spill++ Category 4 Spill++ 2 hours after
awareness of spill
Within two (2) hours of the
City’s knowledge of a
Category 1 spill of 1,000
gallons or greater,
discharging or threatening
to discharge to Waters of
the State, notify CalOES
and obtain a notification
control number.

Within two (2) hours of
the City’s knowledge of a
Category 2 spill of 1,000
gallons or greater
threatening to discharge
to Waters of the State,
notify CalOES and obtain a
notification control
number.
-
-
Within 18 hours of
awareness of spill Conduct water quality
sampling of the receiving
water within 18 hours of
initial knowledge of spill of
50,000 gallons or greater to
surface waters.
- - -
3 Business Days after
awareness of spill Submit Draft Spill Report in
the CIWQS database.

Submit Draft Spill Report in
the CIWQS database. - -
15 Days after the spill
end date
Submit Certified Spill
Report within 15 calendar
days of the spill end date.
(Submit Amended Spill
Report, as needed, within
90 calendar days after the
spill end date.)
Submit Certified Spill
Report within 15 calendar
days of the spill end date.
(Submit Amended Spill
Report, as needed, within
90 calendar days after the
spill end date.)
- -
Within 30 calendars
days after the end of
the calendar month in
which the spill occurs - -
Submit monthly Certified Spill
Report to the online CIWQS
Sanitary Sewer System
Database
(Submit Amended Spill Report,
as needed, within 90 calendar
days after the Certified Spill
Report due date.)
Certify monthly, the
estimated total spill
volume exiting the
sanitary sewer system,
and the total number of
all Category 4 spills into
the online CIWQS
Sanitary Sewer System
Database.
45 days after spill end
date
Submit Technical Report
within 45 calendar days
after the spill end date for
a Category 1 spill in which
50,000 gallons or greater
discharged to surface
waters; and
- - -
By February 1st after
the end of the
calendar year in which
the spills occur. - See ++ note below. -
Upload and certify a
report, in an acceptable
digital format, of all
Category 4 spills to the
online CIWQS Sanitary
Sewer System
Database.
* A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill. ++ See following page for notes.
204 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Regulatory Reporting Guide B-1: Page 2
++ Agency owned lateral spills (Cat 2-4) to be reported by Feb 1 of the following year. • Monthly Spill Reporting of Non-Category 1 Lateral Spills: If either (1) no spills occur during a calendar month or (2) only Category 4, and/or Enrollee-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the Enrollee shall certify, within 30 calendar days after the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually for the designated month. • Annual Certified Spill Reporting of Category 4 and/or Lateral Spills: For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the Enrollee shall annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.
205 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Regulatory Reporting/Notifications Log B-2
Agency/Firm Contacted Individual Spoken to: Date Time Notes CalOES Control Number:
206 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 INSERT TAB:

Tab C: Flowchart
207 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Spill/Backup Response Flowchart C-1: Page 1
YES
NO
Does the
spill/backup appear
to be due to a problem
in the Cityowned/maintained
sewer line?
This is a Private Spill

1. Photograph the extent of the discharge and the discharge boundaries if possible.

2. Notify the property owner that the blockage is in their lateral and that the City does not have legal authority to maintain or perform work on privately-owned laterals.

3. Give customer the “Your Responsibilities as a Private Property Owner” pages from this Workbook (F-4).

4. Recommend to customer they hire a contractor to clear their line.

5. If customer is not home:
• Complete Door Hanger and leave on customer’s door.
• Leave a message on the customer’s voicemail.

6. If the property owner is unable or unwilling to address the cause of the Spill, immediately contact your supervisor and discuss whether Code Enforcement, the County Department of Environmental Health or Regional Water Quality Control Board should be notified.

7. If you are directed to, break the stoppage and clean up the private spill. Be sure to document City staff time and equipment used for potential billing purposes and take pictures.

1. Document the service call according to City procedures.

2. STOP. Do not continue to PAGE 2
Go to PAGE 2

1. Document arrival time.

2. Consider the need to call out additional staff, contractor or mutual aid assistance.

3. If it is possible that this is a Category 1 spill greater than or equal to 1,000 gallons or a Category 2 spill that is threatening to discharge to waters of the State, immediately make the 2-hour notification to Cal-OES and obtain a control number. Record this number on the following pages: A-4, B-2, and D-1 Page 1.

1. Record manhole number or cleanout location of the spill appearance point closest to the failure point, and describe each additional appearance point on the Spill Report (D-1).

2. Take photographs of all spill appearance points, the extent of the spill, and spill boundaries.

START HERE
208 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Spill/Backup Response Flowchart C-1: Page 2

BEGIN DIVERSION AND CONTAINMENT, AS NECESSARY

1. DIVERT AWAY FROM SENSITIVE AREAS:
a. Cover unplugged storm drains w/mats, or use dirt/other material to divert sewage away from sensitive areas (e.g., schools, playgrounds, intersections, etc.)
b. ENSURE PUBLIC CONTACT DOES NOT OCCUR. Use cones/barricades to isolate area.

2. CONTAIN SPILL & RETURN TO SYSTEM, IF POSSIBLE:
a. As practical, plug or block drainage conveyance system entry locations or use rubber mats to cover basin inlet and divert flow to a downstream sanitary sewer manhole (barricade manhole if left open and monitor after barricade) or area suitable to capture the spill for later collection.

If any amount has already reached the drainage conveyance system, trace it downstream to a dry manhole and block it from entering surface waters. i.e., plugs, sandbags, or vacuum truck. b. If you are confident that you can capture the spill in the drainage conveyance system, trace it downstream to a dry manhole and then divert the spill to the drainage conveyance system for later recovery and return to the sanitary sewer.
c. Use bypass pumps to pump around blockage until it can be removed. d. Divert to low area of ground where it can be collected later.

3. PHOTOGRAPH each drainage conveyance system entry location.

ADDRESS CAUSE OF SPILL/BACKUP ASAP

1. For spill/backups not related to a pump station, relieve the stoppage. Note the distance of the obstruction from the manhole and catch/remove debris that could cause another stoppage. After flow has returned to normal, clean the pipe thoroughly. Consider televising (CCTV) the affected line.

2. For pump station related spill/backups refer to that station’s Emergency Response Plan.

3. Photograph staff activities while clearing the blockage.

Go to
PAGE 3
Continue from PAGE 1
209 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Spill/Backup Response Flowchart C-1: Page 3

1. Sample surface waters the spill has reached if safe and if the property owner allows (if the surface water access point is on private property):
• If preliminary volume estimates of the spill are 50,000 gallons or greater, begin collecting as soon as possible but no later than 18 hours after becoming aware of the spill.
• If people are fishing or swimming in the waters, collect samples regardless of the volume of the spill.

2. Refer to and follow the sampling standard operating procedure.

Contain/recover/clean up as much of the spill in the waters and shoreline as possible. Contact Utilities Director to request outside assistance, as appropriate.

NO
YES
Is it feasible/practical
to contain/recover any of the spill from
the surface waters?
Has the spill
reached surface
waters?
YES
NO

DRAINAGE CONVEYANCE SYSTEM CLEANING SOP

1. Seal or berm the drainage conveyance system immediately downstream of point the spill reached.

2. Photograph impacted drainage conveyance system before cleaning.

3. Vacuum any visible sewage – Record the volume of sewage recovered. Record volume on the spill report.

4. Flush impacted sections of the drainage conveyance system with 3X amount of spill, if possible, and contain. Record volume of flush water used and volume of flush water returned to the sanitary sewer on Spill Report.

5. Ensure all visible signs of sewage have been removed.

6. Photograph drainage conveyance system after cleaning is completed.

YES
NO
Was drainage
conveyance
system impacted?

IMPACTED AREA CLEANUP, AS NECESSARY

1. Assign staff to begin cleanup. If you might use the area measured volume method to estimate the volume, draw a sketch of the spill footprint and capture dimensions before washing it down.

2. Remove all signs of gross pollution with a shovel, broom, rake, and bucket. (toilet paper, solids, grease, etc.)

3. Flush impacted area with 3X amount of spill, if possible, and contain. Record volume of flush water used and volume of flush water returned to the sanitary sewer on the Spill Report (D-1).

4. Setup berm/other means to contain all water so it can be returned to sewer

5. Don’t use disinfectants if they may enter storm drain system and not be fully recovered or if they may enter surface waters.

6. Address saturated soil with removal and/or in-place treatment, depending on the extent of the contamination, the location, and land use. Take measures to prevent accidental contact by the public.

NOTE: addressing saturated soil may involve returning to the site one or more days after the spill event.

7. Photograph the area when cleanup operations are complete Go to
PAGE 4
Continue from PAGE 2
....
r
210 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Spill/Backup Response Flowchart C-1: Page 4
Complete the First Responder Form (F-2).

Ask for permission to photograph the
affected area or ask the customer to take
photos. If they decline, note that on the form.

1. If the Livability Assessment on the First Responder Form (F-2) indicates a need for temporary relocation, complete the Lodging Authorization form (F-4).

2. Take a photo of the form to document what was given to the customer.

3. Give the Lodging Authorization form (F-4) to the customer.

4. Give the customer the Information for the Customer Letter (F-4), along with the claim form and the Your Responsibilities as a Private Property Owner guide pages (F-5).

5. Have the customer sign the Backup Forms Checklist (F-1).

Photograph the
backwater
prevention device or
cleanout if you can
locate one on the
affected building

1. Follow the routing instructions indicated on the front of this workbook.

2. Include any photos and/or notes related to this event.

3. Document the service call according to City procedures Did this
spill cause a
sewer backup
impacting private
property?

REGULATORY REPORTING
Make notifications indicated in the Regulatory Reporting Guide (B-1).

YES
NO
Does the
customer want
cleaning service?

1. Complete the Declination of Cleaning Services form
(F-3).

2. Take a photo of the form to document what was given
to the customer.

3. Give the form to the Customer.

1. Call Sierra Pacific Loss Management. See Contact
information on page A-2.

2. Wait for restoration team to arrive, if possible.

3. Clean/disinfect any spill outside of the building. Note:

DO NOT allow any disinfectants to escape to storm
drains.

YES
NO
Continue from PAGE 3

DOCUMENTATION AND VOLUME ESTIMATION

1. Complete the Spill Report (D-1).

2. In the Start Time Determination section for the Spill Report (D1) remember that the spill was probably occurring for a period of time before it was reported.

3. Estimate and document spill volume using two or more of the methods provided in the Spill/Backup Response Workbook (E1 through E-6).

Call the Sierra Pacific
Loss Management
and relay the
information from the
First Responder
Form (F-2)
211 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 INSERT TAB:

Tab D: Spill Report
212 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 1
Check spill category (see A-3 for definitions): oCATEGORY 1 oCATEGORY 2 oCATEGORY 3 oCATEGORY 4 Names of the Persons Completing this Report Contact Information

PHYSICAL LOCATION DETAILS
Spill location name:

Location description:

Address of spill:

City: City of Lakeport Cross Street:

Regional Water Quality Control Board: Central Valley County: Lake County

DATE/TIME
Date and time the City was notified of, or self-discovered, the spill:

Operator arrival time:

PHOTOGRAPHS
Photos must be taken during the spill event. At a minimum, the following photos must be taken:
¡ Appearance point closest to the failure point ¡ All discharge points into surface waters ¡ Extent of the spill and spill boundaries ¡ Location(s) of clean up ¡ Entry location of each drainage conveyance
system the sewage entered
Where are photographs stored?
* Within two (2) hours of the City’s knowledge of a Category 1 or Category 2 spill of 1,000 gallons or greater, discharging or threatening to discharge to waters of the State, notify CalOES and obtain a notification control number.

CalOES NOTIFICATION*
Date: Time: Assigned Control Number:

I I
213 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 2

SPILL ORIGINATION
Description and GPS coordinates of the system location where the spill originated*:

Include manhole number or cleanout location of the spill appearance point closest to the failure point as applicable.

Latitude: Longitude:

Number of additional appearance points:

Spill appearance points: (Check all that apply)
o Backflow Prevention Device
o Combined Sewer Drain Inlet (Combined Collection System Only) o Force Main
o Gravity Mainline
o Inside Building/Structure
o Lateral Clean Out (Private)
o Lateral Clean Out (Public)
o Lower Lateral (Private)
o Lower Lateral (Public)
o Manhole
o Other Sewer System Structure
o Pump Station
o Upper Lateral (Private)
o Upper Lateral (Public)
o Other, describe:

Describe each spill appearance point:

Check to confirm photos were taken of all appearance points: o * Note: If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the “Describe each spill appearance point” description section above. Take photos of spill appearance point(s). 214 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 3
SPILL DESTINATION (Check all that apply)
Final spill destination(s):
o Drainage Conveyance System That Discharges to Surface Water o Surface Water
o Building or Structure
o Drainage Conveyance System
o Groundwater Infiltration Basic or Facility
o Paved Surface
o Street/Curb and Gutter
o Unpaved Surface
o Other, describe:

Description of the spill event destination(s) including GPS coordinates if available that represent the full spread and reach of the spill.

Latitude: Longitude:

Latitude (if needed): Longitude (if needed):

Latitude (if needed): Longitude (if needed):

Latitude (if needed): Longitude (if needed):

Check to confirm photos were taken of spill destination/boundaries: o 215 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 4

SPILL VOLUME
Estimated total spill volume exiting the system: gallons Did the spill reach a drainage conveyance system? o YES o NO If yes:
• Estimated time the spill reached the drainage conveyance system:
• Distance from drainage conveyance system to entry point to surface waters: feet • Method to determine travel time from point of entry to drainage conveyance system to receiving waters:

• Describe the drainage conveyance system transporting the spill:

Estimated spill volume fully recovered from the drainage conveyance system: gallons Estimated spill volume remaining within the drainage conveyance system: gallons Check to confirm photos taken of entry location of drainage conveyance system the sewage entered: o Did the spill reach surface water? o YES o NO
If yes:
• Estimated time the spill entered the surface water:
• Distance from spill appearance point to entry point to surface water: feet • Method to determine travel time to receiving waters:
• Describe all discharge points:

Estimated spill volume that discharged to surface waters: gallons Estimated total spill volume recovered: gallons
Check to confirm photos were taken of the following, as applicable: all discharge points into surface waters, waterbody bank erosion, floating matter, water surface sheen, discoloration of receiving water, any notable impacts to the receiving water: o
Did the spill discharge to a groundwater infiltration basin or facility? o YES o NO If yes,
• Estimated time the spill entered the groundwater infiltration basin or facility:
• Estimated spill volume discharged to the
groundwater infiltration basin or facility: gallons
Estimated spill volume that did NOT reach
drainage conveyance system, surface water,
or groundwater infiltration basin or facility: gallons
Estimated Total Spill Volume Recovered: gallons
216 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 5
SPILL VOLUME (continued)
Method and explanation of volume estimation methods used: (Check all that apply) o Eyeball Estimate (worksheet included in Spill/Backup Response Workbook) o Counting Upstream Connections (worksheet included in Spill/Backup Response Workbook) o Duration and Flow Rate (worksheet included in Spill/Backup Response Workbook) o Measured Volume (worksheet included in Spill/Backup Response Workbook) o Other (provide worksheet/calculations)
Description of how the spill volume estimations were calculated, including at a minimum, the methodology, assumptions and types of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information, used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered):
217 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 6
SPILL START TIME and END TIME DETERMINATION
Were there witnesses to the spill? o YES o NO If yes, provide Spill Witness Statements below:

Witness 1 Name: Witness 1 Contact Information:

Where did they see sewage spill from? c Manhole c Inside Building c Vent/Clean Out c Catch Basin c Wet Well/Lift Station c Other (describe):

When did the witness notice the sewage spilling? ____________ AM / PM Date _____ /______ /_______ Witness description of spill and affected area:

Is it currently spilling? o YES o NO
When did the witness last observe NO Spill occurring? ____________ AM / PM Date _____ /______ /_______ Did the witness notice if the spill had reached the storm drain or surface waters? Comments:

Witness 2 Name: Witness 2 Contact Information:

Where did they see sewage spill from? c Manhole c Inside Building c Vent/Clean Out c Catch Basin c Wet Well/Lift Station c Other (describe):

When did the witness notice the sewage spilling? ____________ AM / PM Date _____ /______ /_______ Witness description of spill and affected area:

Is it currently spilling? o YES o NO
When did the witness last observe NO Spill occurring? ____________ AM / PM Date _____ /______ /_______ Did the witness notice if the spill had reached the storm drain or surface waters? Comments:

Witness 3 Name: Witness 3 Contact Information:

Where did they see sewage spill from? c Manhole c Inside Building c Vent/Clean Out c Catch Basin c Wet Well/Lift Station c Other (describe):

When did the witness notice the sewage spilling? ____________ AM / PM Date _____ /______ /_______ Witness description of spill and affected area:

Is it currently spilling? o YES o NO
When did the witness last observe NO Spill occurring? ____________ AM / PM Date _____ /______ /_______ Did the witness notice if the spill had reached the storm drain or surface waters? Comments:

I
I
I
218 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 7
SPILL START TIME and END TIME DETERMINATION (continued) Are the volume of the spill and rate of flow known? o YES o NO If yes, divide volume by rate of flow to get duration of spill event:

Gallons ÷ GPM = Minutes
Spill Volume Flow Rate Spill Duration
Subtract the duration from the spill end date/time to establish the spill start date/time:
— =
Spill End Date/Time Duration Spill Start Time
Method to determine flow rate:

Solids Present? o None or small amount (indicates recent start) o Significant amount of buildup
Staining? o None (indicates recent start)
o Minor
o Significant
Distance sewage has traveled from spill point:

Spill Start Time:

Spill End Date and Time:

How was end time determined?
o Broke stoppage
o Turned pump station back on
o Other, explain:

Description of the methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time.
219 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 8
SPILL CAUSE (check all that apply)
o Air Relief Valve (ARV)/Blow Off Valve (BOV)/Backwater Valve Failure o Construction Diversion Failure
o Collection System Maintenance Failure (Specify Below) o Damage by Others Not Related to CS Construction/Maintenance (Specify Below) o Debris from Construction
o Debris from Lateral
o Debris-General
o Debris-Rags
o Debris-wipes/Non-disposables
o Flow Exceeded Capacity (Separate CS Only)
o Fats, Oils and Grease (FOG)
o Inappropriate Discharge to CS
o Natural Disaster (Specify Below)
o Operator Error (Specify Below)
o Pipe Structural Problem/Failure – Installation
o Pipe Structural Problem/Failure – Controls
o Pump Station Failure – Power
o Pump Station Failure – Mechanical
o Pump Station Failure – Controls
o Rainfall Exceeded Design, I and I (Separate CS Only)
o Root Intrusion
o Siphon Failure
o Surcharged Pipe (Combines CS Only)
o Vandalism (Specify Below)
o Other, specify:
220 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 9

SYSTEM FAILURE LOCATION
System failure location:
o Air Relief Valve (ARV)/Blow Off Valve (BOV) Failure
o Force Main
o Gravity Mainline
o Lower Lateral
o Manhole
o Pump Station Failure – Controls
o Pump Station Failure – Mechanical
o Pump Station Failure – Power
o Siphon
o Upper Lateral (Specify Below)
o Other, specify:

Description of the pipe material at the failure location:
o Copper
o Galvanized Steel
o Polyvinyl Chloride (PVC)
o Acrylonitrile Butadiene Styrene (ABS)
o Cross-Linked Polyethylene (PEX)
o Cast Iron
o Vitrified Clay
o Concrete
o Ductile Iron
o Fiberglass
o Other, specify:

Estimated age of sewer asset at the point of blockage or failure (if applicable):
years
Diameter of sewer pipe at the point of blockage or failure: inches 221 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 10

SPILL IMPACT
Description of the impact of the spill:

STORM EVENT
Was spill associated with a storm event? o YES o NO
SPILL RESPONSE ACTIVITIES (check all that apply)
o Cleaned Up (Specify Below)
o Mitigated Effects of Spill (Specify Below)
o Contained All or Portion of Spill
o Restored Flow
o Returned All Spill to Sanitary Sewer System
o Returned Portion of Spill to Sanitary Sewer System
o Property Owner Notified
o Other Enforcement Agency Notified
o Other, specify:

Description of spill response activities including description of immediate spill containment and cleanup efforts:
222 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 11
SPILL CORRECTIVE ACTION (check all that apply)
o Added Sewer to Preventive Maintenance Program
o Adjusted Schedule/Method of Preventive Maintenance
o Enforcement Action Against FOG Source
o Inspected Sewer Using CCTV to Determine Cause
o Plan Rehabilitation or Replacement of Sewer
o Repaired Facilities or Replaced Defect
o Other, specify:

Refer to Collection System Failure Analysis Report for details about:
• Spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps. • Schedule of major milestones
Check to confirm completion of each report:
o Post-Spill Assessment
o Collection System Failure Analysis
Spill response completion date:

INVESTIGATION
Detailed narrative of investigation and investigation findings of cause of spill:

Is the City conducting an ongoing investigation? o YES o NO If yes, reasons for an ongoing investigation:

If yes, expected date of completion of investigation:
223 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 12
SURFACE WATERS (Complete for Category 1 Spills Only)
Name of receiving
water body
Type of receiving
water body: Stream,
Ocean, Wetland, Slough,
Estuary, River, Lake,
Reservoir, Vernal Pool,
Wash, or Other (specify)
Description of the water body(s), including but not limited to:
o Observed impacts on aquatic life,
o Public access impact(s): public closure, restricted public access, temporary restricted use, and/or other (specify below)
o Responsible entity for closing/restricting use of water body, and o Number of days closed/restricted as a result of the spill.

MUNICIPAL INTAKE (Complete for Category 1 and 2 Spills Only) Was the spill located within 1,000 feet of a municipal surface water intake? o YES o NO Describe:
224 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sanitary Sewer Spill Field Report D-1: Page 13

WATER SAMPLING
Were water quality samples collected? o YES o NO o N/A
If yes, identify sample locations:

Identify parameters the water quality samples were analyzed for: (Check all that apply) o Total Coliform Bacteria
o Fecal coliform bacteria
o E-coli
o Ammonia
o Other, specify:
225 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 INSERT TAB:

Tab E: Volume Estimation
226 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation Computations & Examples E-1: Page 1
Miscellaneous Computations & Examples
To convert inches to feet
(NOTE: for the purposes of
this worksheet, the unit of
measurement will be in
feet for formula examples)
Divide the inches by 12 or use the chart on the right.

Example 1: 27" ÷ 12 = 2.25'
Example 2: 1¾" = ?'
1" (0.08') + ¾" (0.06') = 0.14'
Volume of one cubic foot 7.48 gallons of liquid
Area:

Two-dimensional
measurement represented
in square feet (SQ/FT or
ft2)
Square/rectangle: Area = Length x Width
Circle: Area = π x r2 (where π ≈ 3.14 and r = radius = ½ diameter) Triangle: Area = ½ (Base x Height)
Volume:

Three-dimensional
measurement represented
in cubic feet (CU/FT or ft3)
Rectangle/square footprint: Volume = Length x Width x Depth Circle footprint (cylinder): Volume = π x r2 x Depth
(where π ≈ 3.14 and r = radius = ½ diameter)
Triangle footprint: Volume = ½ (Base x Height) x Depth
Depth:

Wet Stain on Concrete or
asphalt surface
If the depth is not measurable because it is only a wet stain, use the following estimated depths:
o Depth of a wet stain on concrete surface: 0.0026' (1/32") o Depth of a wet stain on asphalt surface: 0.0013' (1/64") These were determined to be a reasonable depth to use on the respective surfaces through a process of trial and error. One gallon of water was poured onto both asphalt and concrete surfaces. Once the area was determined as accurately as possible, different depths were used to determine the volume of the wetted footprint until the formula produced a result that (closely) matched the one gallon spilled. This process was repeated several times.

Depth:

Contained or “Ponded”
sewage
Measure actual depth of standing sewage whenever
possible. When depth varies, measure several representative sample points and determine the average. Use that number in your formula to determine volume.
227 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation Computations & Examples E-1: Page 2
Miscellaneous Computations & Examples (continued)
Area/Volume of a Rectangle or Square
Formula: Length x Width x Depth = Volume in cubic feet
25' X 12' X 0.14' = 42 Cubic Feet
Length Width Depth Volume
Multiply the volume by 7.48 gallons to determine the volume in gallons:
42 ft3. X 7.48 = 314.16 gallons
Volume gal/ft3 Volume
Area/Volume of a Right Triangle
Formula: Base x Height x Depth = Volume in cubic feet

0.5 X 45' X 10' X 0.05' x 7.48 = 84.15 gallons
Base Height Depth gal/ft3 Volume
Area/Volume of a Circle
Formula: π x r2 x Depth = Volume in cubic feet
The radius is ½ the diameter, which is a straight line passing from side to side through the center of a circle.

13.5' X 13.5' X 3.14 X 0.06' x 7.48 = 256.8 gallons
Radius Radius π Depth gal/ft3 Volume
12'
25'
Depth = 1 ¾"
10'
45'
Depth = 5/8"
For isosceles triangles
(two sides are equal lengths),
break it down into two right triangles
and compute area as you would for
the right triangle.
228 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation: Eyeball Estimation Method (for ≤100 gallons) E-2 Spill Date: Location:

This method is invalid if surface conditions are wet (due to rainfall, irrigation, etc.) DO NOT use this method under these circumstances.

STEP 1: Position yourself so that you have a vantage point where you can see the entire spill.

STEP 2: Imagine one or more buckets or barrels of water tipped over. Depending on the size of the spill, select a bucket or barrel size as a frame of reference. It may be necessary to use more than one bucket/barrel size.

STEP 3: Estimate how many of each size bucket or barrel it would take to make an equivalent spill. Enter those numbers in Column A of the row in the table below that corresponds to the bucket/barrel sizes you are using as a frame of reference.

STEP 4: Multiply the number in Column A by the multiplier in Column B. Enter the result in Column C.

A B C
Size of bucket(s)/barrel(s) How many of this size? Multiplier Estimated Spill Volume x 1 gallon
x 5 gallons
x 32 gallons
x 55 gallons
x gallons
Estimated Total Spill Volume:

STEP 5: List assumptions made to arrive at the total estimated spill volume:

STEP 6: Take photographs. Where are photographs stored? The following photos must be taken: appearance point closest to the failure point, extent of the spill and spill boundaries, the entry location of each drainage conveyance system the sewage entered, all discharge points into surface waters (Category 1 spill only), and location(s) of clean up. 229 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation: Duration and Flow Rate Comparison Method E-3: Page 1 Spill Date: Location:

Compare the spill to reference images below to estimate flow rate of the current spill. NOTE: If the manhole cover in your picture has vent holes or more than one pry hole, do not use these pictures for comparison.

Describe which reference photo(s) were used and any additional factors that influenced applying the reference photo data to the actual spill:

Flow Rate Based on Photo Comparison: gallons per minute (gpm) (Continued on next page)
Near View
Far View
Near View
Far View
5 gpm 25 gpm 50 gpm 100 gpm
150 gpm 200 gpm 300 gpm 400 gpm
SSCSC Manhole Spill Gauge: CWEA Southern Section Collections Systems Committee. Spill Simulation courtesy of Eastern Municipal Water District. 230 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation: Duration and Flow Rate Comparison Method E-3: Page 2 Start Date and Time 1.

End Date and Time 2.

Spill Event Total Time Elapsed
(subtract Line 1 from Line 2. Show in minutes.)

3. Average Flow Rate GPM
(Account for diurnal flow pattern)

4. Total Volume Estimated Using Duration and
Flow Method (Line 3 x Line 4)

5. List assumptions made to arrive at the total estimated spill volume:

Take photographs. Where are photographs stored?
The following photos must be taken: appearance point closest to the failure point, extent of the spill and spill boundaries, the entry location of each drainage conveyance system the sewage entered, all discharge points into surface waters (Category 1 spill only), and location(s) of clean up. 231 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation: Area/Volume Method E-4: Page 1
Spill Date: Location:

STEP 1: Describe spill area surface: c Asphalt c Concrete c Dirt c Landscape c Inside Building c Other:

STEP 2: Draw/sketch the outline (footprint) of the spill. Then break the footprint down into recognizable shapes.

Label/identify each sketch outline area (Area 1, Area 2, etc.) See example below.

EXAMPLE:

Area 2
Include the" wet a,.as as
part of your esUmate of
wetted ,,.. Inside on• of lh•
Dimensions: 2.5' diameter
+/- 100% of the surface inside the cirole is wet
Dimensions: 8' x 6'
+/- 80% of the surface inside the rectangle is wet
Dimensions: 6' x 3'
+/- 60% of the surface inside the rectangle is wet
232 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation: Area/Volume Method E-4: Page 2
STEP 3: Calculate the area of the footprint by completing the table below for each area in Step 2. Measure actual depth of standing sewage whenever possible. When depth varies, measure several representative sample points and determine the average. If the depth is not measurable because it is only a wet stain, use the following estimated depths: Depth of a wet stain on concrete surface: 0.0026' (1/32") Depth of a wet stain on asphalt surface: 0.0013' (1/64") Rectangles:

Area #
(from
labeled
drawing)
Length X Width X % Wet = Area X Depth = Volume
à ft X ft X % = ft2 X ft = ft3
à ft X ft X % = ft2 X ft = ft3
à ft X ft X % = ft2 X ft = ft3
Circles:

Area #
(from
labeled
drawing)
π X Radius X Radius X % Wet = Area X Depth = Volume
à 3.14 X ft X ft X % = ft2 X ft = ft3
à 3.14 X ft X ft X % = ft2 X ft = ft3
à 3.14 X ft X ft X % = ft2 X ft = ft3
STEP 4: If part of the spill is in a gutter, use the formula below to calculate the volume:

X X X 0.5 = ft3
Length Depth Width Volume
STEP 5: Calculate Total Spill Volume (sum of all of the volume calculations above): ft3 STEP 6: Convert from cubic feet to gallons by multiplying by 7.48. ft3 x 7.48 gallons = gallons
spill volume in cubic feet Total estimated volume
Curb
Sewage Gutter
/.,,.--.-(2=-l . I ~~ ~
233 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation: Area/Volume Method E-4: Page 3
STEP 7: List assumptions made to arrive at the total estimated spill volume. Adjust estimation up for moderate to severe cracking and/or roughness of surface (General Rule 20% to 40%):

STEP 8: Take photographs. Where are photographs stored? The following photos must be taken: appearance point closest to the failure point, extent of the spill and spill boundaries, the entry location of each drainage conveyance system the sewage entered, all discharge points into surface waters (Category 1 spill only), and location(s) of clean up. 234 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Volume Estimation: Upstream Connections Method E-5
Spill Date: Location:

Attach and/or reference system map and identify location of spill and buildings contributing to spill.

STEP 1: Determine the number of Equivalent Dwelling Units (EDUs) for this spill: EDUs NOTE: A single-family residential home = 1 EDU. For commercial buildings, refer to agency documentation.

STEP 2: This volume estimation method utilizes daily usage data based on flow rate studies of several jurisdictions in California. Column A shows how an average daily usage of 180 gallons per day is distributed during each 6-hour period. Adjust the table as necessary to accurately represent the actual data.

Complete Column E by entering the number of minutes the spill was active during each 6-hour time period.

Multiply column D times Column E to calculate the gallons spilled during each time period. Add the numbers in Column F together for the Total Estimated spill Volume per EDU.

Time Period
Flow Rate Per EDU Spill

A B C D E F
Gallons
per
Period
Hours
per
period
A÷B =
Gallons
per Hour
C÷60 =
Gallons per
Minute
Minutes spill
was active
during period
D × E = Gallons
spilled per period
6am-noon 72 6 12 0.20
noon-6pm 36 6 6 0.10
6pm-midnight 54 6 9 0.15
midnight-6am 18 6 3 0.05
Total Estimated Spill Volume per EDU:

STEP 3: Multiply the Estimated spill Volume per EDU from Step 2 by the number of EDUs from Step 1. gallons X = gallons
Volume per EDU # of EDUs Estimated spill Volume
STEP 4: Adjust spill volume as necessary considering other factors, such as activity that would cause a fluctuating flow rate (doing laundry, taking showers, etc.). Explain rationale below and indicate adjusted spill estimate (attach a separate page if necessary).

Total Estimated spill Volume: gallons
STEP 7: List assumptions made to arrive at the total estimated spill volume:

STEP 8: Take photographs. Where are photographs stored? The following photos must be taken: appearance point closest to the failure point, extent of the spill and spill boundaries, the entry location of each drainage conveyance system the sewage entered, all discharge points into surface waters (Category 1 spill only), and location(s) of clean up. 235 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Drawing Worksheet E-6
+ + ~ + + + +
+ + + + + t- t-
+ t- + t t- t- t- t- t-
+ + + + + +
+ + t- + t t- t- + + t- t-
+ + t- + t t- t- + + + t- t-
+ + t- + + t- t- + + + t-
+ + + + ,.
+ t- + t + t- + + t- t-
+ + t- + + + t- + + + t-
+ t- + + + t- + + + t-
+ + + + + +
+ t- + + t- t- + +
+ t- + t t-
+ + + + + +
+ t- + t + + + + + +
+ + + + + + + + + + + +
+ + t- + + t- t- + + + t- t-
+ + + + + +
+ + + + + t- + +
+ t- + t t- t- + + t- t-
+ + + + + + + +
+ t- + t + + t + t-
+ + + + + + + + + + + +
+ t- + + t- t- + + t- t-
+ + t + +
+ + + t + + + +
~
236 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 INSERT TAB:

Tab F: Backup Forms
237 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Backup Forms Checklist (Backup Only) F-1
Complete this form only if there is a backup into a residence or business.

Instructions to Sewer Crew:

1. Take photo of each form before giving it to the customer for documentation.

2. Tear forms listed below out of this workbook and hand to customer. Leave this page (F-1) and the First Responder Form (F-2) in this workbook, do not give to Customer.

3. Check each item that was provided to the customer.

4. Have customer sign below.

Forms/Documents:
o Form F-3: Declination of Cleaning Services
o Form F-4: Customer Information Letter
o Form F-5: Your Responsibilities as a Private
Property Owner
o Form F-6: Claim Form
Forms Provided to:

Customer Name
Customer Signature
Date
Check here if customer declines to sign: o
Formularios / Documentos:
o F-3: Declinación de los Servicios de Limpieza
o F-4: Carta de Información del Cliente
o F-5: Sus Responsabilidades Como Propietario
de Una Propiedad Privad
o F-6: Formulario de Reclamación
Formularios Proporcionados a:

Nombre del cliente
Firma del cliente
Fecha
Marque aquí si el cliente se niega a firmar: o
Forms Provided by:

Employee Name Initial Date
Instructions to Utilities Director:

Send photos, including the photos of the documents given to the customer, and a copy of the First Responder form to the City Clerk. 238 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
First Responder Form (Backup Only) F-2: Page 1
Complete this form only if there is a backup into a residence or business.

Fill out this form as completely as possible.

Ask customer if you may enter the home. If so, take photos of all damaged and undamaged areas.

PERSON COMPLETING THIS FORM:

Name:

Title:

PHONE:

DATE:

TIME:

TIME STAFF ARRIVED ON-SITE:

DOES THE CUSTOMER WANT THE CITY TO CALL FOR CLEANING SERVICE? o Yes o No If no, give the customer the Cleaning Declination Form and have them sign here: __________________________ If customer called a cleaning contractor, provide name and contact number:

RESIDENT NAME:
o Owner
o Renter

IF RENT,
PROPERTY MANAGER(S):

OWNER:

ADDRESS:

PHONE:

ADDRESS:

PHONE:
# OF PEOPLE LIVING AT RESIDENCE:

Approximate Age of Home: # of Bathrooms: # of Rooms Affected:

Numbers of Photographs or Videos Taken:
o Photographs ________ o Video ________
o Customer did not provide or allow photographs
Where are photos/video stored?
Is nearest upstream manhole visibly higher than the drain/fixture that spilled? o Yes o No Does property have a Property Line Cleanout or BPD? o Cleanout o BPD o Neither o Unknown If yes, was the Property Line Cleanout/BPD operational at the time of the spill? o Yes o No o Unknown Have there ever been any previous spills at this location? o Yes o No o Unknown Has the resident had any plumbing work done recently?
If YES, please describe:
o Yes o No o Unknown
GO TO PAGE 2
I I
239 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
First Responder Form (Backup Only) F-2: Page 2

LIVABILITY ASESSMENT
• Is there insufficient non-contaminated living space for residents to stay during cleaning including a functioning and non-contaminated bathroom? o Yes o No
• Are there any residents that are pregnant, are children, have severe allergies/asthma, have respiratory problems, and/or have a compromised immune system? o Yes o No
• Is the area a childcare or extended care facility? o Yes o No • Is the food preparation area contaminated? o Yes o No • Is it currently after 8pm, or if it is currently before 8pm will the cleaning and disinfection be completed after 10pm? o Yes o No
If the answer to any of the questions above is YES, advise the resident to consider temporarily relocating while the living area is cleaned.

SANITARY SEWER LINE BLOCKAGE LOCATION

PLEASE CHECK THE BOXES THAT
DESCRIBE YOUR OBSERVATIONS:

On the diagram below, place an X where in the mainline or lateral you believe the problem occurred.

Building Cleanout Was:
o Non-Existent
o Full
o Empty
Property Line Cleanout was:
o Non-Existent
o Full
o Empty
Did sewage go under buildings? ☐ Yes ☐ No ☐ Unsure
Recommended Follow-Up Action(s):
240 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Declination of Cleaning Services (Backup Only) F-3
Customer Information
NAME: ADDRESS: TELEPHONE:

ON
(date)
AT
(time)
Approximately
(quantity)
GALLONS OF:
o Sewage o Grey Water o Toilet Bowl Water o Odor
o Other (describe):

Spilled from (or odor emanating from)
o Toilet o Shower/Tub o Washer o Other (describe):

The spill affected the following areas (check one):
o Bathroom o Bedroom o Hallway o Garage
o Kitchen o Crawlspace o Other (specify):

The spill affected the following flooring:
o Tile o Wood Flooring
o Linoleum o Carpet
o Other (specify):
and/or additional materials:
o Area Rugs o Towels
o Clothing o Other (specify):

This Form Completed By: Name: Date:
(Write legibly) Title: Time:

CUSTOMER, please read the following and sign below. I/We acknowledge that City of Lakeport (City) has offered to provide professional cleaning and decontamination services to remediate the sewage backup and/or spill described above and that we declined the offer. We further understand and acknowledge that because we have declined, any necessary remediation activities will be conducted without City assistance, and that the City will not accept responsibility for work performed by persons other than those engaged by the City. The City will also not accept responsibility for any charges related to this incident that are not usual and customary. Refer to “Your Responsibilities as a Private Property Owner” (Page F-5) for recommendations regarding spill cleanup.

CLIENTE, por favor lea lo siguiente y firme a continuación. Yo/Nosotros reconocemos que City of Lakeport (ciudad) se ha ofrecido a proporcionar servicios profesionales de limpieza y descontaminación para remediar la reserva de aguas residuales y/o derrame descrita anteriormente y que rechazamos la oferta. Además, entendemos y reconocemos que debido a que hemos rechazado, cualquier actividad de remediación necesaria se llevará a cabo sin la asistencia de ciudad, y que ciudad no aceptará responsabilidad por el trabajo realizado por personas que no sean las contratadas por ciudad. La ciudad tampoco aceptará responsabilidad por ningún cargo relacionado con este incidente que no sea habitual y habitual. Consulte "Sus Responsabilidades Como Propietario De Una Propiedad Privada" (Página F-5) para obtener recomendaciones sobre la limpieza de derrames.

Customer Signature / Firma del cliente *: Date:

The information above was
explained to the customer by
the following employee:

Name: Title:

Signature: Date:
*Note to responders: if customer declines to sign this form, then have a co-worker sign here as a witness:

Name: Signature: Date:
241 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Customer Information Letter (Backup Only) F-4 (English) Dear Property Owner:

We recognize that sewer backup incidents can be stressful and require immediate response while all facts concerning how an incident occurred are still unknown. Rest assured that we do all we can to prevent this type of event from occurring in the first place. Nevertheless, occasionally tree roots or other debris in the sewer lines causes a backup into homes immediately upstream of the blockage. At this time the City is investigating the cause of this incident.

If the City is found to be responsible for the incident, we are committed to cleaning and restoring your property, and to protecting the health of those affected during the remediation process.

The cleaning contractor provided by the City has been selected because of their adherence to established protocols that are designed to assure to all parties thorough, cost-effective and expeditious cleaning services. You also have the right to select your own cleaning contractor, but the City does not guarantee payment of fees/expenses incurred and reserves the right to dispute fees/expenses deemed not usual and customary.

Depending on the extent of the backup our Sewer Crew may advise you to consider relocating temporarily while the living area is cleaned. In that case, if the City is found to be responsible for the backup you may submit a claim for reimbursement of reasonable lodging for one night. Additional lodging and other expenses may be discussed with Sierra Pacific Loss Management at (800) 413-2999.

To discuss this matter, or to submit a claim, contact the City Clerk at (707) 263-5615.

Sincerely,
The City of Lakeport
242 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Customer Information Letter (Backup Only) F-4 (Spanish) Estimado Propietario:

Reconocemos que los incidentes de la red de alcantarillado pueden ser estresantes y requieren una respuesta inmediata, mientras que todos los hechos relacionados con la forma en que ocurrió el incidente aún son desconocidos.

Tenga la seguridad de que haremos todo lo posible para evitar que este tipo de evento ocurra en primer lugar. Sin embargo, ocasionalmente las raíces de los árboles u otros residuos en las líneas de alcantarillado causan una copia de seguridad en los hogares inmediatamente antes del bloqueo. En este momento el ciudad está investigando la causa de este incidente.

Si se determina que el ciudad es responsable del incidente, nos comprometemos a limpiar y restaurar su propiedad, ya proteger la salud de las personas afectadas durante el proceso de remediación.

El contratista de limpieza proporcionado por el Distrito ha sido seleccionado debido a su adhesión a los protocolos establecidos que están diseñados para garantizar a todas las partes servicios de limpieza exhaustivos, rentables y rápidos. También tiene derecho a seleccionar su propio contratista de limpieza, pero el ciudad no garantiza el pago de los honorarios / gastos incurridos y se reserva el derecho de disputar los honorarios / gastos que se consideren no habituales y habituales.

Dependiendo de la extensión de la copia de seguridad, nuestro Sewer Crew puede aconsejarle que considere reubicarse temporalmente mientras se limpia la sala de estar. En ese caso, si se determina que el cuidad es responsable de la copia de seguridad, puede presentar una reclamación de reembolso de alojamiento razonable por una noche. El alojamiento adicional y otros gastos pueden discutirse con el Sierra Pacific Loss Management al (800) 413-2999.

Para discutir este asunto, comuníquese con el City Clerk al (707) 263-5615. Para presentar un reclamo por daños comuníquese con la City Clerk al (707) 263-5615.

Sinceramente,
The City of Lakeport
243 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Your Responsibilities as a Private Property Owner (Backup Only) F-5: Page 1 How a Sewer System Works
A property owner's sewer pipes are called service laterals and are connected to larger local main and regional trunk lines. Service laterals run from the connection at the home to the connection with the public sewer. Depending on your location, a portion of the lateral is the responsibility of the property owner and must be maintained by the property owner.

How do sewage spills happen?
Sewage spills occur when the wastewater in
underground pipes spills through a manhole, cleanout,
or broken pipe. Most spills are relatively small and can be stopped and cleaned up quickly, but left unattended
they can cause health hazards, damage to homes and
businesses, and threaten the environment, local
waterways, and beaches. Common causes of sewage
spills include grease build-up, tree roots,
broken/cracked pipes, missing or broken cleanout
caps, undersized sewers, and groundwater/rainwater
entering the sewer system through pipe defects and
illegal connections.

Prevent most sewage backups with a Backflow Prevention Device This type of device can help prevent sewage backups into homes and businesses. If you don’t already have a Backflow Prevention Device, contact a professional plumber or contractor to install one as soon as possible.

Is my home required to have a backflow prevention device? Section 710.1 of the Uniform Plumbing Code (U.P.C.) states: “Drainage piping serving fixtures which have flood level rims located below the elevation of the next upstream manhole cover or private sewer serving such drainage piping shall be protected from backflow of sewage by installing an approved type of backwater valve.” The intent of Section 710.1 is to protect the building interior from mainline sewer spills or surcharges.

Additionally, U.P.C. 710.6 states:
“Backwater valves shall be located where
they will be accessible for inspection and
repair at all times and, unless
continuously exposed, shall be enclosed
in a masonry pit fitted with an
adequately sized removable cover.”

Regln ITrun
-
In this diagram Houses 1 and 2 require Backflow Prevention Devices Downstream
Manhole
Cover
l
Underground Sanitary Sewer
Upstream
Manhole
Cover
l
244 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Your Responsibilities as a Private Property Owner (Backup Only) F-5: Page 2 Spill cleanup inside the home:

For large clean ups, a professional cleaning firm should be contacted to clean up impacted areas, If you hire a contractor, it is recommended to get estimates from more than one company. Sometimes, homeowner’s insurance will pay for the necessary cleaning due to sewer backups. Not all policies have this coverage, so check with your agent.

If you decide to clean up a small spill inside your home, protect yourself from contamination by observing the following safety measures. Those persons whose resistance to infection is compromised should not attempt this type of clean up.

Other Tips:
• Keep children and pets out of the affected area.
• Turn off heating/air conditioning systems
• Wear rubber boots, rubber gloves, and goggles during cleanup. • Discard items that cannot be washed and disinfected (such as: mattresses, rugs, cosmetics, toys, etc.)
• Remove and discard drywall and insulation that has been contaminated with sewage or flood waters. • Thoroughly clean all hard surfaces (such as flooring, concrete, molding, wood and metal furniture, countertops, appliances, sinks and other plumbing fixtures) with hot water and laundry or dish detergent. • Help the drying process with fans, air conditioning units, and dehumidifiers. • After completing cleanup, wash your hands with soap and water. Use water that has been boiled for 1 minute (allow the water to cool before washing your hands) OR use water that has been disinfected (solution of 1/8 teaspoon of household bleach per 1 gallon of water). Let it stand for 30 min. If water is cloudy, use ¼ teaspoon of household bleach per 1 gallon of water.
• Wash clothes worn during cleanup in hot water & detergent (wash apart from uncontaminated clothes). • Wash clothes contaminated with sewage in hot water and detergent. Consider using a laundromat until your onsite wastewater system has been professionally inspected and serviced.

Spill cleanup outside the home:
• Keep children and pets out of the affected area until cleanup has been completed. • Wear rubber boots, rubber gloves, and goggles during cleanup of affected area. • Clean up sewage solids (fecal material) and place in properly functioning toilet or double bag and place in garbage container.
• On hard surfaces areas such as asphalt or concrete, it is safe to use a 2% bleach solution, or ½ cup of bleach to 5 gallons of water, but don’t allow it to reach a storm drain as the bleach can harm the environment. • After cleanup, wash hands with soap and water. Use water that has been boiled for 1 minute (allow to cool before washing your hands) OR use water that has been disinfected (solution of 1/8 teaspoon of household bleach per 1 gallon of water). Let it stand for 30 min. If water is cloudy, use ¼ teaspoon of household bleach per 1 gallon of water.
• Wash clothes worn during cleanup in hot water and detergent (wash apart from uncontaminated clothes). • Wash clothes contaminated with sewage in hot water and detergent. Consider using a laundromat until your onsite wastewater system has been professionally inspected and serviced.

Seek immediate
attention if you
become injured or ill
during or after the
cleanup process.
245 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sus Responsabilidades Como Propietario de Una Propiedad Privada F-5 Página 1: en español Cómo funciona un sistema de alcantarillado
Las tuberías de alcantarillado de un propietario se denominan servicios laterales y están conectadas a líneas troncales principales y regionales locales más grandes. Los servicios laterales se ejecutan desde la conexión en el hogar hasta la conexión con el sistema de alcantarillado del Distrito. Estos laterales son responsabilidad del propietario y deben ser mantenidos por el propietario.
¿Cómo ocurren los derrames de aguas residuales?
Los derrames de aguas residuales ocurren cuando las aguas residuales en las tuberías subterráneas se desbordan a través de un pozo de acceso, limpieza o tubería rota. La mayoría de los derrames son relativamente pequeños y se pueden
detener y limpiar rápidamente, pero si se los deja
desatendidos, pueden causar riesgos para la salud, dañar viviendas y negocios y amenazar el medio ambiente, las vías fluviales locales y las playas. Las causas comunes de
derrames de aguas residuales incluyen acumulación de
grasa, raíces de árboles, tuberías rotas / agrietadas, tapas de limpieza faltantes o rotas, alcantarillas de tamaño
insuficiente y aguas subterráneas / pluviales que ingresan al sistema de alcantarillado a través de defectos en las tuberías y conexiones ilegales.

Prevenga la mayoría de las copias de seguridad de aguas residuales con un dispositivo de prevención de reflujo Este tipo de dispositivo puede ayudar a prevenir las copias de seguridad de aguas residuales en hogares y empresas.

Si aún no tiene un dispositivo de prevención de reflujo, comuníquese con un plomero o contratista profesional para instalar uno lo antes posible.
¿Se requiere que mi hogar tenga un dispositivo de prevención de reflujo? La Sección 710.1 del Código Uniforme de Plomería (UPC) establece: “Los accesorios de tuberías de drenaje que tienen llantas de nivel de inundación ubicadas debajo de la elevación de la siguiente boca de alcantarilla corriente arriba o la alcantarilla privada que atiende dicha tubería de drenaje deben protegerse contra el reflujo de aguas residuales al instalar un tipo de válvula de evacuación ”. La intención de la Sección 710.1 es proteger el interior del edificio de los desagües o sobrecargas de alcantarillado de la línea principal.

Adicionalmente, U.P.C. 710.6 dice: Las válvulas de aguas residuales deben ubicarse donde puedan ser inspeccionadas y reparadas en todo momento y, a menos que estén continuamente expuestas, deben estar encerradas en un pozo de mampostería equipado con una cubierta removible del tamaño adecuado.

En este dl11grama, las c:uas 1 y 2 requleren dlsposltlvos de prevenc:lon de refluJo Tapa"-
alcantar111•
aguaa abajo
!
Alcantar111ado S.nitar1o Subterraneo
Tapa"-
alcan1arill•
eguuorrlbo
!

HCGOCIO
Pt1.I\\I ff lr1LlmNnlo de
AQUH R61id11alea
246 / 352
© 2004-2023 DKF Solutions Group, LLC. All rights reserved. Licensed to City of Lakeport for City use only. 7-27-23 City of Lakeport Spill Emergency Response Plan
Sus Responsabilidades Como Propietario de Una Propiedad Privada F-5 Página 2: en español Limpieza de derrames dentro de la casa:

Para grandes limpiezas, se debe contactar a una empresa de limpieza profesional para limpiar las áreas afectadas. Si contrata a un contratista, se recomienda obtener estimaciones de más de una compañía. A veces, el seguro del propietario de vivienda pagará la limpieza necesaria debido a las reservas de alcantarillado. No todas las pólizas tienen esta cobertura, así que consulte con su agente.

Si decide limpiar un pequeño derrame dentro de su casa, protéjase de la contaminación observando las siguientes medidas de seguridad. Aquellas personas cuya resistencia a la infección esté comprometida no deben intentar este tipo de limpieza.

Otros consejos:
o Mantenga a los niños y mascotas fuera del área afectada. o Apague los sistemas de calefacción / aire acondicionado o Use botas de goma, guantes de goma y gafas durante la limpieza. o Deseche los artículos que no se puedan lavar y desinfectar (como: colchones, alfombras, cosméticos, juguetes, etc.)
o Retire y deseche los paneles de yeso y el aislamiento contaminado con aguas residuales o aguas de inundación.
o Limpie a fondo todas las superficies duras (como pisos, concreto, molduras, muebles de madera y metal, mostradores, electrodomésticos, fregaderos y otros accesorios de plomería) con agua caliente y ropa o detergente para platos.
o Ayude al proceso de secado con ventiladores, unidades de aire acondicionado y deshumidificadores. o Después de completar la limpieza, lávese las manos con agua y jabón. Use agua que haya sido hervida por 1 minuto (deje que el agua se enfríe antes de lavarse las manos) O use agua que haya sido desinfectada (solución de 1/8 cucharadita de lejía doméstica por 1 galón de agua). Dejar reposar durante 30 min. Si el agua está turbia, use ¼ cucharadita de lejía de uso doméstico por 1 galón de agua. o Lave la ropa usada durante la limpieza con agua caliente y detergente (lave aparte de la ropa no contaminada).
o Lavar la ropa contaminada con aguas residuales en agua caliente y detergente. Considere usar una lavandería hasta que su sistema de aguas residuales en el sitio haya sido inspeccionado y reparado profesionalmente.

Limpieza de derrames fuera de la casa:
o Mantenga a los niños y las mascotas fuera del área afectada hasta que se haya completado la limpieza. o Use botas de goma, guantes de goma y gafas protectoras durante la limpieza del área afectada. o Limpie los sólidos de alcantarillado (material fecal) y colóquelos en un inodoro o bolsa doble que funcione correctamente y colóquelos en un contenedor de basura.
o En áreas de superficies duras como el asfalto o el concreto, es seguro usar una solución de lejía al 2%, o ½ taza de lejía a 5 galones de agua, pero no permita que llegue a un drenaje de tormenta ya que la lejía puede dañar la ambiente.
o Después de la limpieza, lávese las manos con agua y jabón. Use agua que haya sido hervida por 1 minuto (deje enfriar antes de lavarse las manos) O use agua que haya sido desinfectada (solución de 1/8 cucharadita de cloro por 1 galón de agua). Dejar reposar durante 30 min. Si el agua está turbia, use ¼ cucharadita de lejía de uso doméstico por 1 galón de agua. o Lave la ropa usada durante la limpieza con agua caliente y detergente (lave aparte de la ropa no contaminada).
o Lavar la ropa contaminada con aguas residuales en agua caliente y detergente. Considere usar una lavandería hasta que su sistema de aguas residuales en el sitio haya sido inspeccionado y reparado profesionalmente.

Busque atención
inmediata si se lesiona
o se enferma durante
o después del proceso
de limpieza.
247 / 352

Page 1 of 3 ends
← All documents from this meeting