As part of obtaining reasonable assurance about whether City's financial statements are free from material misstatement, we pe1formed tests of its compliance with certain provisions of laws, regulations, contracts, and grant agreements, noncompliance with which could have a direct and material effect on the financial statements. However, providing an opinion on compliance with those provisions was not an objective of our audit, and accordingly, we do not express such an opinion. The results of our tests disclosed no instances of noncompliance or other matters that are required to be reported under Government Auditing Standards.
Purpose of this Report
The purpose of this report is solely to describe the scope of our testing of internal control and compliance and the results of that testing, and not to provide an opinion on the effectiveness of the entity's internal control or on compliance. This report is an integral part of an audit performed in accordance with Government Auditing Standards in considering the entity's internal control and compliance. Accordingly, this communication is not suitable for any other purpose.
Santa Ana, California
November 26, 2025
192
TO: The Honorable Mayor and City Council
SUBJECT: Award of Bid for Public Works Projects No. 2024-04 Play Area Improvements to the Existing Bloomfield Park
INTRODUCTION
COUNCIL AGENDA
December 09, 2025
On December 2, 2025, the City Clerk received four bids for the Play Area Improvements to the Existing Bloomfield Park project. The work generally consists of demolition, grading, concrete foundations, play equipment installation, rubberized surfacing and installation, and miscellaneous related improvements required by the contract documents.
STATEMENT OF FACT
Ten contractors purchased plans and specifications, and four submitted a bid proposal. The bid results are summarized below:
1 I Micon Construction $545,459
2 I Western State Builders $549,900
3 I R.E. Schultz $565.750
4 I Newman Midland : $865,100
The lowest responsible bidder is Micon Construction Inc. in the base bid amount of $545,459.
Staff have verified with the State Contractors License Board that Micon Construction Inc. is properly licensed for the work. References contacted by staff provided favorable comments on the quality of their work and they have completed similar types of work for various public agencies. Staff also recommend that a contingency of approximately 15% be included, since there could be unforeseen, unexpected conditions, once construction begins.
The consulting engineering firm of Ardurra has an agreement with the City of Lakewood to assist with various engineering matters. Staff have requested a proposal to provide project management, contract administration, construction materials testing and inspection, and construction observation for the project. The proposal is in the amount of $90,290 which includes a contingency allowance of $30,290.
FISCAL IMPACT
The Bloomfield Playground replacement project is funded through a combination of Measure A grant funds administered by the Los Angeles County Regional Park and Open Space District (RPOSD) and locally administered Measure L funds. The City's Seven-Year Capital Improvement Program (CIP) previously identified and programmed a placeholder amount of $493,000 in
3.3.a
Award of Bid for Public Works Projects No. 2024-04
Play Area Improvements to the Existing Bloomfield Park
December 9, 2025
Page2 of3
Measure A funds for this project. The grant award subsequently received from Los Angeles County is in the amount of $675,750, which is $182,750 higher than the originally programmed amount.
In addition, the CIP budget included $105,000 in Measure L funds to supplement the project and provide construction contingency funding. To fully align the project budget with the awarded grant amount and ensure full project funding, staff recommend increasing the Measure A appropriation in project account P4BF2620-MEAAL-COUNTY-O by $182,750. Sufficient funds will be available within the approved CIP following the recommended budget adjustment. No additional General Fund appropriation is required.
The following table illustrates the funding and expenses:
Funding
Measure A Measurel Total
P4BF2620-MFAAL-COUNI'Y-O P4EF2620-MEAL-MEASL·O Fun ding Account String ' 675,750,00 $ 105,000.00 $ 78,0,750.00
C!P Plan Approprla!lon $ 493,000.00 s 105,000.00 $ 598,000.00 Additio nalA~ard Arnau nt $ 182,750.00 $ 182,750.00
Expense
MeasureA MeasureL Total ExpenseAccou nt Strini
$ 675,750.00 $ 41,000.00 $ 716,750.00
Micon Construction Inc. $ 545,459.00 $ 545,459.00 P4BF2620-MEAAL-CON-ffi.OOMFIEID Ardurra $ 90,290.00 $ 90,290.00 P4BF2620-MEAAL-CMI-BLOOMFIEID Contingency $ 40,001.00 $ 40,001.00 P4BF2620- MEAAL--CGT-BLOOMFIEID Contlng;ency $ 41,000.00 $ 41,000.00 P4BF2620-MFAL-0Jr-BLOOMFIELD RemainingAvailableFunds $ $ 64,000.00 $ 64,000.00
SUMMARY
Bids have been received for Public Works Contract No. 2024-04. Staff recommend increasing the appropriation of Measure A funds for the project to fully align with the grant amount awarded.
Staff further recommend awarding the construction contract to the lowest responsible bidder, Micon Construction Inc., in the amount of$545,459 (P4BF2620-MEAAL-CON-BLOOMFIELD) and authorizing $82,000 in project funds for contingency purposes ($40,001 from account P4BF2620- MEAAL -CGT-BLOOMFIELD and $41,000 from account P4BF2620-MEAL-CGTBLOOMFIELD). Staff also recommend authorizing Ardurra's proposal for construction management services in the amount of $90,290 from account P4BF2620-MEAAL-CMIBLOOMFIELD.
RECOMMENDATION
Staff recommends that the City Council:
(1) Increase the appropriation of Measure A funds in account P4BF2620-MEAAL-COUNTYO by $182,750.
Award of Bid for Public \Yorks Projects No. 2024-04
Play Area Improvements to the Existing Bloomfield Parle December 9, 2025
Page3 of3
(2) Adopt the plans, specifications, and working details for the subject project. (3) A ward a contract for the "Play Area Improvements to the Existing Bloomfield Park", Public Works Contracts 2024-04, in the amount of$545,459 to the low bidder Micon Construction Inc. and authorize the Mayor to sign the contract in a form approved by the City Attorney.
( 4) Authorize staff to approve a cumulative total of change orders, as necessary not to exceed $82,000.
(5) Authorize Ardurra's proposal to provide the construction management assistance under their existing Agreement for Engineering Services, in an amount o. f$90,290, and ~rize the Mayor to sign the proposal. --;;;;1/ / .-17// I~
Kelli Pickler tS °'thaddei:s McCormack
Director of Public Works City Manager
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com December02, 202 5
Sam Chambers
Public WorksProject Manager
City of Lakewood
5050 Clark Avenue
Lakewood, CA 90712
SUBJECT: PROPOSAL TO PROVIDE PART-TIME CONSTRUCTION MANAGEMENT,
INSPECTION, AND MATERIAL TESTING SERVICES FOR THE CITY OF LAKEWOOD BLOOMFIELD PARK PLAY AREA IMPROVEMENTS PROJECT .
Dear Sam,
Ardurra Group, Inc. (Ardurra) is pleased to submit this proposal to the City of Lakewood (City) forpart-time professional Construction Management, Inspection, and Material Testing services for the City of Lakewood Bloomfield Park Play Area Improvements Project .
We appreciate the opportunity to present our qualifications and approach toward delivering this project on time and within budget. As an experienced and reliable civil engineering, construction management and inspection firm, the Ardurra team offers the fo llowing benefits to the City:
▪ Strong leadership for a successful project delivery. Gafur Oyewo willserve as the designated construction manager. Gafur brings over15 years ofproject/ construction management and inspection experience, and has provided construction management services to the City of Lakewood on other CIP park improvement projects. Gafur is familiar with City of Lakewood personnel and proceduresand isskilled at managing multiple projects. He understandsthe importance of high-level coordination efforts and interdepartmental coordination as it relates to the Bloomfield Park Play Area Improvements Project. Supporting Gafur with field inspections will be Ardurra Public Works Inspector Joe Mullaney.
▪ Team built for success: Together, and with the support of our talented project controls staff and our subconsultant, Ninyo & Moore for soils compaction testing, theproposed teamwill competently represent the City in the field and will advocate for the City’sbestintereststhroughout the duration of the project.
▪ Peace of mind through each phase of your project. Our professionals have years of experience managing a wide variety of public works projects—from scopingand design throughconstruction, closeout, and commissioning. Our time-tested, proactive approach will help us anticipate and expeditiously address challenges, keepingtheproject moving forward. Our proven process minimizesunexpected challenges, provides predictability, and streamlines the delivery process.
A/
ARDURRA
December 02, 2025
Sam Chambers
Public Works Project Manager
City of Lakewood
5050 Clark Avenue
Lakewood, CA 9071 2
SUBJECT: PROPOSAL TO PROVIDE PART-TIME CONSTRUCTION MANAGEMENT,
INSPECTION, AND MATERIAL TESTING SERVICES FOR THE CITY OF LAKEWOOD BLOOMFIELD PARK PLAY AREA IMPROVEMENTS PROJECT.
Dear Sam,
Ardurra Group, Inc. (Ardurra) is pleased to submit this proposal to the City of Lakewood (City) for part-time professional Construction Management, Inspection, and Material Testing services for the City of Lakewood Bloomfield Park Play Area Improvements Project.
We appreciate the opportunity to present our qualifications and approach toward delivering this project on lime and within budget. As an experienced and reliable civil engineering, construction management and inspection firm, the Ardurra team offers the following benefits to the City:
Strong leadership for a successful project delivery. Gafur Oyewo will serve as the designated construction manager. Gafur brings over 1 5 years of project/ construction management and inspection experience, and has provided construction management services to the City of Lakewood on other CIP park improvement projects. Gafur is familiar with City of Lakewood personnel and procedures and is skilled at managing multiple projects. He understands the importance of high-level coordination efforts and interdepartmental coordination as it relates to the Bloomfield Park Play Area Improvements Project. Supporting Gafur with field inspections will be Ardurra Public Works Inspector Joe Mullaney.
Team built for success: Together, and with the support of our talented project controls staff and our subconsultant, Ninyo & Moore for soils compaction testing, the proposed team will competently represent the City in the field and will advocate for the City's best interests throughout the duration of the project.
Peace of mind through each phase of your project. Our professionals have years of experience managing a wide variety of public works projects-from scoping and design through construction, closeout, and commissioning. Our time-tested, proactive approach will help us anticipate and expeditiously address challenges, keeping the project moving forward. Our proven process minimizes unexpected challenges, provides predictability, and streamlines the delivery process. 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com Ardurra has engaged Ninyo & Moore, a Geotechnical firm, to observe the contractor’s compaction efforts and provide sampling and testing during subgrade preparation, aggregate base placement , and concrete sampling and testing.
We appreciate the opportunity to submit this proposal and look forward to working with the City on the successful delivery of this project . Please feel free to contact me at ( 612 ) 232 -4318 or [email protected] should you have any questions or require additional information.
Respectfully submitted,
Ardurra Group, Inc.
Gafur Oyewo
Contract Administration & Inspection Group Leader
cc: Dino D’Emilia, PE, F.ASCE, QSD
Omar Alameddine
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
Ardurra has engaged Ninyo & Moore, a Geotechnical firm, to observe the contractor's compaction efforts and provide sampling and testing during subgrade preparation, aggregate base placement, and concrete sampling and testing.
We appreciate the opportunity lo submit this proposal and look forward to working with the City on the successful delivery of this project. Please feel free to contact me at (612) 232-4318 or [email protected] should you have any questions or require additional information.
Respectfully submitted,
Contract Administration & Inspection Group Leader
cc: Dino D'Emilio, PE, F.ASCE, QSD
Omar Alameddine
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
PROJECT UNDERSTANDING
Ardurra understands that the City seeksto retain a qualified consultant to provide part-time professional Construction Management, Inspection, and Material Testing services for the City of Lakewood Bloomfield Park Play Area Improvements Project. The project includes, but is not limited to, demolition, grading, concrete foundations, removal of existing play equipment and sand, installation of new play equipment, shade structure, EPDM rubber play surfacing, gravel drains, and miscellaneous related improvements as required.
The details of the project are as defined in the bid documents for “ Bloomfield Park Play AreaImprovements Project” approved on November 11, 2025.
The construction cost is estimated to be $478,436.91 , with the project anticipated to be completed within 90 working days following issuance of the Notice to Proceed(NTP). The project is anticipated tostart in January 2025 .
SCOPE OF SERVICES
CONSTRUCTION MANAGEMENT & INSPECTION SERVICES
Due to the City’s budget constraints, constructionmanagement and inspection services are proposed to be on a limited, part-timeand as-needed basisand may include, some or all of the tasks listed below, within the approved budget allocation and corresponding level of effort . ▪ Collaborate and work cooperatively with the City’s Project Manager assigned to the project. ▪ Act as the City’s representative and monitor the actions taken are in line with the City’s policy, philosophy, strategy, standards.
▪ Coordinate between the Contractor and City’s PM as needed. ▪ Assist the City’s PM with responding to requests for information (RFIs) and submittals as needed. ▪ Assist the City’s PM with reviewing, analyzing, negotiating, and recommending for approval of change orders (potential and actual)as needed.
▪ Assist the City’s PM with reviewing the construction schedule provided by the Contractor. Request and assist with reviewing the updated schedule from the Contractor when actual progress deviates from the baseline schedule as needed.
▪ Assist the City’s PM as needed with reviewingand recommending for approval progress payments.
Present any disputed items and recommend non -disputed items for payment , as needed. ▪ Monitor compliance with the City’s Quality Management Plan (QAP) and/or plans, specifications, and referenced standards as applicable.
▪ Assist in monitoring Contractor’s implementation and maintenance of SWPPP / BMP measures as applicable and as needed.
▪ Provide support to the City’s PM in addressing and resolvingfield problems as needed. ▪ Track pendinginspection issues and follow upuntil issues are resolved, as needed. ▪ Assist the City’s PM with project closeout and filing of the Notice of Completion and Release of Retention, as needed.
▪ Review and familiarization with contract documents.
▪ Participate in pre-construction meetingsand other meetings and conferencesthat are led by the City’s PM, as needed.
PROJECT UNDERSTANDING
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
Ardurra understands that the City seeks to retain a qualified consultant to provide part-time professional Construction Management, Inspection, and Material Testing services for the City of Lakewood Bloomfield Park Play Area Improvements Project. The project includes, but is not limited to, demolition, grading, concrete foundations, removal of existing play equipment and sand, installation of new play equipment, shade structure, EPDM rubber play surfacing, gravel drains, and miscellaneous related improvements as required.
The details of the project are as defined in the bid documents for "Bloomfield Park Play Area Improvements Project" approved on November 1 1, 2025.
The construction cost is estimated to be $478,436.91, with the project anticipated to be completed within 90 working days following issuance of the Notice to Proceed (NTP). The project is anticipated to start in January 2025.
SCOPE OF SERVICES
CONSTRUCTION MANAGEMENT & INSPECTION SERVICES
Due to the City's budget constraints, construction management and inspection services are proposed to be on a limited, part-time and as-needed basis and may include, some or all of the tasks listed below, within the approved budget allocation and corresponding level of effort.
Collaborate and work cooperatively with the City's Project Manager assigned to the project.
Act as the City's representative and monitor the actions taken are in line with the City's policy, philosophy, strategy, standards.
Coordinate between the Contractor and City's PM as needed.
Assist the City's PM with responding to requests for information (RFls) and submittals as needed.
Assist the City's PM with reviewing, analyzing, negotiating, and recommending for approval of change orders {potential and actual} as needed.
Assist the City's PM with reviewing the construction schedule provided by the Contractor. Request and assist with reviewing the updated schedule from the Contractor when actual progress deviates from the baseline schedule as needed.
Assist the City's PM as needed with reviewing and recommending for approval progress payments.
Present any disputed items and recommend non-disputed items for payment, as needed.
Monitor compliance with the City's Quality Management Plan [QAP) and/or plans, specifications, and referenced standards as applicable.
Assist in monitoring Contractor's implementation and maintenance of SWPPP / BMP measures as applicable and as needed.
Provide support to the City's PM in addressing and resolving field problems as needed.
Track pending inspection issues and follow up until issues are resolved, as needed.
Assist the City's PM with project closeout and filing of the Notice of Completion and Release of Retention, as needed.
Review and familiarization with contract documents.
Participate in pre-construction meetings and other meetings and conferences that are led by the City's PM, as needed.
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com ▪ Assist theCity’s Project Manager (PM), monitor and expedite the Contractor’s proposed construction schedule.
▪ Monitor and document the Contractor’s compliance with plans, specifications, and referenced standards.
▪ Assist as needed in the review of “submittals” required by the specifications. ▪ Assistas needed with coordination between PM, Contractor, and any other entities that may be involved.
▪ Review Contractor performance and expedite corrective measures for discrepancies as they occur. ▪ Coordinate and provide assistance and direction to technicians performing material tests. Measure the work-in-place to verify quantities.
▪ Monitor testing results and require Contractor to take corrective actions if results are unsatisfactory. ▪ Assist the City with public outreach. Document and respond to public inquiries, monitor and document compliance with working hours, noise levels, and dust mitigation requirements. ▪ Review and make recommendations for the processing of payment requests. ▪ Assist as needed with the consideration, negotiation, and processing of change orders. ▪ Identify items requiring corrective action by either the contractor or the City. Monitor and document timely corrective actions implemented by the contractor. ▪ Develop punch list items and monitor corrections made.
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
Assist the City's Project Manager (PM), monitor and expedite the Contractor's proposed construction schedule.
Monitor and document the Contractor's compliance with plans, specifications, and referenced standards.
Assist as needed in the review of" submittals" required by the specifications.
Assist as needed with coordination between PM, Contractor, and any other entities that may be involved.
Review Contractor performance and expedite corrective measures for discrepancies as they occur.
Coordinate and provide assistance and direction to technicians performing material tests. Measure the work-in-place to verify quantities.
Monitor testing results and require Contractor to take corrective actions if results are unsatisfactory.
Assist the City with public outreach. Document and respond to public inquiries, monitor and document compliance with working hours, noise levels, and dust mitigation requirements.
Review and make recommendations for the processing of payment requests.
Assist as needed with the consideration, negotiation, and processing of change orders.
Identify items requiring corrective action by either the contractor or the City. Monitor and document timely corrective actions implemented by the contractor.
Develop punch list items and monitor corrections made.
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
ESTIMATED FEE ALLOWANCE
Notes: Terms and conditions shall be pursuant to the City of Lakewood Engineering and Project Management Support Services Contract dated June 15, 2023.
Assumptions: Based on Ardurra’s project understanding t he following assumptions have been made in the preparation of our estimated fee:
1. Serviceswill be provided during the General Contractor’s Contract Completion Time.
2. Services are proposed on an as-needed, part-time basis as feasible within the allocated budget.
3. Ardurra will not exceed the budgeted levels of effort unless directed/approved by the City in writing.
4. Ardurra’s Project Field Representative services are limited to the tasks detailed in the scope of services above during the part-time level of effort budgeted in the proposed fee below.
5. To the extent feasible, work completed by the Contractor during durations when the Ardurra Field Representative is absent from the site will be observed on subsequent visit. Ardurra will not be responsible for monitoring work that is covered during its absence from the site.
Exclusions to Scope and Fee: The following items are specifically excluded:
1. Legal advice
2. Temporary field office facilities, equipment, furniture, utilities and/or services
3. Observation of work performed by Contractor during hours that Ardurra is not scheduled to be on site
4. Night, weekend, or special shift work
5. Construction labor, materials and/or equipment
90 Working Days
TITLE
Est. Hours
Per Day Total Hours Hourly Rate
Extended
Fee
Senoir Construction Manager - - $ 281.00 $ 12,000.00
Public Works Inspector (Prevailing Wage) - - $ 214.00 $ 26,500.00 Project Controls Engineer - - $ 184.00 $ 9,500.00
Document Control/Admin - - $ 147.00 $ 1,000.00
Material Testing (Allowance) $ 11,000.00
Subtotal Construction $ 60,000.00
$ 60,000.00
Optional Services
Item Amount
Additional Construction Management (Allowance) $ 25,290.00 Additional Material Testing (Allowance) $ 5,000.00
Total Optional Services $ 30,290.00
Estimated Fee
Construction Management, Inspection, and Material Testing Services For the Bloomfield Park Play Area Improvements Project
City of Lakewood
Total Estimated Fee
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
Senoir Construction Manager
ESTIMATED FEE ALLOWANCE
Estimated Fee
Construction Management, Inspection, and Material Testing Services For the Bloomfield Park Play Area Improvements Project
City of Lakewood
90 Working Days
Est. Hours
Total Hours Hourly Rate TITLE Per Day
$ 281.00
Public Works Ins ector(Prevailin Wa e) $ 214.00
Pro· ect Controls En ineer $ 184.00
Document Control/ Adm in $ 147.00
Material T estin (Allowance)
Extended
Fee
$ 12,000.00
$ 26,500.00
$ 9,500.00
$ 1,000.00
$ 11,000.00
Notes: Terms and conditions shall be pursuant to the City of Lakewood Engineering and Project Management Support Services Contract dated June 15, 2023.
Assumptions: Based on Ardurra's project understanding the following assumptions have been made in the preparation of our estimated fee:
l. Services will be provided during the General Contractor's Contract Completion Time.
2. Services are proposed on an as-needed, part-time basis as feasible within the allocated budget.
3. Ardurra will not exceed the budgeted levels of effort unless directed/ approved by the City in writing.
4. Ardurra's Project Field Representative services ore limited to the tasks detailed in the scope of services above during the part-time level of effort budgeted in the proposed fee below.
5. To the extent feasible, work completed by the Contractor during durations when the Ardurra Field Representative is absent from the site will be observed on subsequent visit. Ardurra will not be responsible for monitoring work that is covered during its absence from the site.
Exclusions to Scope and Fee: The following items are specifically excluded:
l. Legal advice
2. Temporary field office facilities, equipment, furniture, utilities and/ or services
3. Observation of work performed by Contractor during hours that Ardurra is not scheduled to be on site
4. Night, weekend, or special shift work
5. Construction labor, materials and/or equipment
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
6. Additional services not specifically called for in the proposal.
7. Expert witness services
8. Standby services
6. Additional services not specifically called for in the proposal.
7. Expert witness services
8. Standby services
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
RESUMES
GAFUR OYEWO
INSPECTION SERVICES MANAGER/SENIOR CONSTRUCTION MANAGER
QUALIFICATIONS
Gafur Oyewo brings 1 5 years of project and construction management experience, with proficiency in large-scale public works project administrative and management processes such as critical path management (CPM), project scope management, payment/requisition processing, and safety management. He has extensive knowledge in commercial and residential property rehabilitation and restoration as well as floating and fixed marine asset dry-docking and repair. His experience spans projects involving a diverse range of installations, which include landscaping, roofing, asbestos abatement, masonry, steel structure erection, concrete, electrical, plumbing, and interior renovation.
PROJECT EXPERIENCE
Tot Lot Playground Improvements to Biscailuz Park & Playground Improvements to Boyar Park,Lakewood Department of Public Works (Lakewood, CA) – Construction Manager for this project thatincludes infrastructure improvements at two parks within the city of Lakewood. Project scope includes removal of existing sand, play equipment and concrete foundations, grading, removal and replacement of chain link fabric, installation of new Owner Furnished Contractor Installed (OFCI) play equipment, new resilient rubberized surfacing, and miscellaneous related improvements at Biscailuz and Boyar Parks. Provided construction management and inspection services in the field and ensured contractor compliance with plans and specifications.
Mary K. Giordano Regional Transit Center, Torrance Public Works Department (Torrance, CA) – Inspector for thisflagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers.
This LEED v2009 Gold project included a 15,000 -square-foot building that accommodates a transit store, an operator layover area with amenities, offices, security office/post communications room, training/conference room, storage room, and the ability to house areas for small retail use. Th e 5-acre terminal facility provides eight bus berths; a 250-space parking lot; a passenger dropoff zone; eight bicycle lockers; electric car charging station infrastructure; CCTV security cameras; and anti-vandalism/anti-skating devices. The project also involved offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard, and construction of an extension of 208th Street. 2024 Merit Award, ACEC California
EDUCATION
MS Asset Integrity
Management
Robert Gordon University,
Aberdeen, Scotland
BEng Naval Architecture State
University of New York
Maritime College
CERTIFICATIONS
OSHA 10-Hour Construction &
Safety
OSHA 30-Hour Construction &
Safety
PROFESSIONAL
AFFILIATIONS
Royal Institution of Naval
Architects
Society of Naval Architects
and Marine Engineers
SOFTWARE
Microsoft Project, Primavera
P6, AutoCAD, GHS, NavCad,
Rhinoceros, Maxsurf,
Hydromax, Hullspeed,
Hecsalv, ShipConstructor,
Seekeeper
YEAR ENTERED
PROFESSION
2010
ARDURRA HIRE
2021
RESUMES
GAFUR OYEWO
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
INSPECTION SERVICES MANAGER/SENIOR CONSTRUCTION MANAGER
QUALIFICATIONS
Gafur Oyewo brings 15 years of project and construction management experience, with proficiency in large-scale public works project administrative and management processes such as critical path management {CPM), project scope management, payment/requisition processing, and safety management. He has extensive knowledge in commercial and residential property rehabilitation and restoration as well as floating and fixed marine asset dry-docking and repair. His experience spans projects involving a diverse range of installations, which include landscaping, roofing, asbestos abatement, masonry, steel structure erection, concrete, electrical, plumbing, and interior renovation.
PROJECT EXPERIENCE
Tot Lot Playground Improvements to Biscailuz Park & Playground Improvements lo Boyar Park, Lakewood Department of Public Works (Lakewood, CA) - Construction Manager for this project that includes infrastructure improvements at two parks within the city of Lakewood. Project scope includes removal of existing sand, play equipment and concrete foundations, grading, removal and replacement of chain link fabric, installation of new Owner Furnished Contractor Installed (OFCI} play equipment, new resilient rubberized surfacing, and miscellaneous related improvements at Biscailuz and Boyar Parks. Provided construction management and inspection services in the field and ensured contractor compliance with plans and specifications.
Mary K. Giordano Regional Transit Center, Torrance Public Works Department (Torrance, CA) - Inspector for this flagship terminal for the City's l 1-route agency, Torrance Transit, and other public transportation providers.
This LEED v2009 Gold project included a 15,000-square-foot building that accommodates a transit store, an operator layover area with amenities, offices, security office/ post communications room, training/ conference room, storage room, and the ability to house areas for small retail use. The 5 -acre terminal facility provides eight bus berths; a 250-space parking lot; a passenger dropoff zone; eight bicycle lockers; electric car charging station infrastructure; CCTV security cameras; and anti-vandalism/ anti-skating devices. The project also involved offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard, and construction of on extension of 208th Street. 2024 Merit Award, ACEC California
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com Redondo Beach South Bay Regional Intermodal Transit Center, City of Redondo Beach (Redondo Beach, CA) – Alternate Inspector. The new $13.2-million LEED-certified transit center includes a 2,900-SF building that houses an operator lounge, passenger waiting area with restrooms, and offices. Other improvements included a kiss-and-ride parking lot and passenger drop-off area, as well as 11 bus bays, signalized crosswalks, traffic signals, striping, and an upper-level parking lot. 2024 Merit Award, ACEC California; 2023 Project Achievement Award for Transportation, CMAA Southern California; and 2023 BEST Project of the Year (Facilities), APWA Southern California
Polliwog Park Lower Playground Replacement Project, Manhattan Beach Public Works (Manhattan Beach, CA ) – Alternate Construction Manager.Projectincludes the removal and replacement of out -of-service play equipment, play surface, fencing, as well as renovation of parking lots and walkways. The new playground will include a pirate and beach themed playground designed using a community consensus pro cess, complete with new play surfaces and shade structures.
Belmont Plaza Pool Rebuild/Revitalization Project, Long Beach Public Works Department (Long Beach, CA) – Assistant Project Manager. Project consists of the construction of a world -class aquatics facility which will replace the now-demolished Belmont Olympic Pool. The new facility will host swimming, water polo and platform diving events at the local, regional, and national levels. Ardu rra is representing the City and its interests in all negotiations, meetings, community outreach, entitlements, permitting, designmanagement and related activities throughout the project. Helped prepare an application to the California Coastal Commission for a Coastal Development Permit. Ardurra is spearheading value engineering analyses and a subsequent entitlement and community outreach project to adjust the project to available funding sources.
Borough of Manhattan Community College Entrance Plaza Rehabilitation*, Dormitory Authority of the State of New York (New York, NY) – Project Manager. Project involved rehabilitation of the entrance plaza through major landscaping upgrades. Work performed included, but was not limited to, removal and disposal of existing landscaping; rehabilitation of planter boxes; demolition of existin g concrete slab; excavation of sub-grade soil to establish tree pit large enough to accept CU structural soil for tree stab ilization, planting soil, and placement landscaping (trees and shrubs); and relocation or disposal of above -grade cylindrical concrete planters using heavy lift cranes. Ensured landscaping subcontractor’s preconstruction product submittals (soil analysis, certificates, etc.), test results (compaction/proctor, sieve analysis, etc.), and post - construction maintenance and warranty submittals satisfactory to contract requirements.
Performed quality control verification through oversight, inspection, and documentation of installation/daily construction activities, ensuring tree rootball stabilization mechanisms were installed and located per contract drawings and to avoid non-conformance reports (NCR). Efficiently coordinated activities between landscaping and electrical subcontractors, ensuring tree/planter lighting was installed satisfactorily.
Managed critical path schedule, ensuring long lead items such as trees and shrubs on plan ting schedule, sloped planter boxes, etc., were procured, delivered, and planted/installed during planting season.
Additional responsibilities included oversight and management of multiple subcontractors (roofing, asbestos abatement, concrete, electrical, plumbing, and structural steel) through coordination and review of two -week look-ahead schedule, and access to work areas along with the project phasing plans, to avoid deadtime, impedances, and/or safety violations. Management of project scope, change orders, requests for information (RFI), budgets, and procurement of resources. Generation and processing schedule of values (SOV), payment requisitions, additional work/change order proposals, and negotiation of values. Provided health, safety, and environment (HS&E) management, facilitation, and creation of site safety plans and other safety Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
Redondo Beach South Bay Regional lntermodal Transit Center, City of Redondo Beach (Redondo Beach, CA) - Alternate Inspector. The new $13.2-million LEED-certified transit center includes o 2, 900-SF building that houses an operator lounge, passenger waiting area with restrooms, and offices. Other improvements included a kiss-and-ride parking lot and passenger drop-off area, as well as 11 bus bays, signalized crosswalks, traffic signals, striping, and on upper-level parking lot. 2024 Merit Award, ACEC California; 2023 Proiect Achievement Award for Transportation, CMAA Southern California; and 2023 BEST Pro;ect of the Year (Facilities), APWA Southern California
Polliwog Pork Lower Playground Replacement Project, Monhotton Beach Public Works (Monhotton Beach, CA) - Alternate Construction Manager. Project includes the removal and replacement of out-of-service play equipment, ploy surface, fencing, as well as renovation of parking lots and walkways. The new playground will include a pirate and beach themed playground designed using a community consensus process, complete with new play surfaces and shade structures.
Belmont Plaza Pool Rebuild/Revitalization Project, Long Beach Public Works Department (Long Beach, CA) - Assistant Project Manager. Project consists of the construction of a world-class aquatics facility which will replace the now-demolished Belmont Olympic Pool. The new facility will host swimming, water polo and platform diving events at the local, regional, and national levels. Ardurra is representing the City and its interests in all negotiations, meetings, community outreach, entitlements, permitting, design management and related activities throughout the project. Helped prepare an application to the California Coastal Commission for a Coastal Development Permit. Ardurra is spearheading value engineering analyses and o subsequent entitlement and community outreach project to adjust the project to available funding sources.
Borough of Manhattan Community College Entrance Plaza Rehabilitation*, Dormitory Authority of the State of New York (New York, NY) - Project Manager. Project involved rehabilitation of the entrance plaza through major landscaping upgrades. Work performed included, but was not limited to, removal and disposal of existing landscaping; rehabilitation of planter boxes; demolition of existing concrete slab; excavation of sub-grade soil to establish tree pit large enough to accept CU structural soil for tree stabilization, planting soil, and placement landscaping {trees and shrubs); and relocation or disposal of above-grade cylindrical concrete planters using heavy lift crones. Ensured landscaping subcontractor's preconstruction product submittols (soil analysis, certificates, etc.), test results (compaction/proctor, sieve analysis, etc.), and postconstruction maintenance and warranty submittals satisfactory to contract requirements.
Performed quality control verification through oversight, inspection, and documentation of installation/ daily construction activities, ensuring tree rootball stabilization mechanisms were installed and located per contract drawings and to avoid non-conformance reports (NCR). Efficiently coordinated activities between landscaping and electrical subcontractors, ensuring tree/ planter lighting was installed satisfactorily.
Managed critical path schedule, ensuring long lead items such as trees and shrubs on planting schedule, sloped planter boxes, etc., were procured, delivered, and planted/ installed during planting season.
Additional responsibilities included oversight and management of multiple subcontractors (roofing, asbestos abatement, concrete, electrical, plumbing, and structural steel) through coordination and review of two-week look-ahead schedule, and access to work areas along with the project phasing plans, to avoid deadtime, impedances, and/ or safety violations. Management of project scope, change orders, requests for information (RFI), budgets, and procurement of resources. Generation and processing schedule of values (SOV), payment requisitions, additional work/ change order proposals, and negotiation of values. Provided health, safety, and environment (HS&E) management, facilitation, and creation of site safety plans and other safety 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com documentation/programs; shop drawings and layouts; and material product/technical data, and safety data sheet (SDS) submittals.
P.S. 811 M – Mickey Mantle School Rehabilitation*, New York City School Construction Authority (New York, NY) – Project Manager. Project included exterior masonry and flood elimination. Managed critical path schedule to make sure that the project was delivered on time. Responsible for oversight and management of multiple subcontractors through coordination and revi ew of two-week look-ahead schedule along with the project plans to avoid deadtime, impedances, and/or safety violations. Coordinated access and activities in public spaces to minimize impact to the client, students, staff, visitors, etc. Managed the project scope, change orders, RFIs, budgets, and procurement of resources. Performed quality control verification through inspection and documentation of daily construction activities to ensure compliance with contract requirements and avoid NCRs. Generated and processed SOV, payment requisitions, additional work/change order proposals, and negotiation of values. Provided HS&E management, facilitation, a nd creation of site safety plans and other safety documentation/programs; shop drawings and layouts; and material product/technical data, and SDS submittals.
Coney Island Houses, Hurricane Sandy Restoration*, New York City Housing Authority (Brooklyn, NY) – Project Manager. roof replacement and exterior restoration project for Coney Island Houses. Following Superstorm Sandy, NYCHA was tasked with the monumental goal of repairing 33 damaged developments housing 60,000 residents and building them back stronger and more resilient.
Ocean Bay (Oceanside), Hurricane Sandy Restoration*, New York City Housing Authority (Queens, NY) – Project Engineer. In the aftermath of Superstorm Sandy, buildings on NYCHA developments were without electricity, heat, and hot water. NYCHA’s recovery effort included major rehabilitation of building infrastructure, including the Ocean Bay housing development. The project included installation of emergency generators on roofs, replacement of electrical panels, and installation of connecting risers. Services included tracking and coordination of scheduled work with the general contractor. Responsible for creation of shop drawings, project status reports, submittals, job inventory, notifications of delay, quality control through RFIs, identification of additional/extra work, processing of change orders, and attending weekly progress meetings.
Shirley A. Chisholm State Office Building Restoration Project*, New York State Office of General Supply (New York, NY) – Assistant Project Manager. repair the Shirley A. Chisholm State Office Building, which is a 13-story facility that houses 12 state agencies. The scope of this project included window and door replacement; facade restoration; terracotta band, water table, a nd cornice replacement; concrete restoration; sidewalk replacement; structural steel repair or replacement; mezzanine skylight and curt ain wall replacement; acoustical ceiling repair or replacement; asbestos abatement; roof replacement; new metal siding installation; interior sheetrock and soffit installation; bulkhead demolition; roof parapet demolition; and waterproofing and rebuild. Responsible for management and coordination of critical path subcontractor (multiple) work to ensure minimal slip to the construction schedule; procurement and coordination of long lead items such as windows and doors, mezzanine skylight and curtain wall sys tem, tapered insulation roof system, precast concrete lintels, terracotta bands and cornices, roof metal siding system and soffits. Generated and coordinated submittals, RFIs, additional work estimates with construction manager and architect/engineer of record. Negotiated change orders based on additional work bulletins; performed monthly site safety walkthroughs and inspections with client safety management personnel; provided construction permits management; and conducted monthly payment requisition proce ssing and negotiation.
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
documentation/programs; shop drawings and layouts; and material product/technical data, and safety data sheet {SDS) submittals.
P.S. 81 l M - Mickey Mantle School Rehabilitation*, New York City School Construction Authority (New York, NY) - Project Manager. Project included exterior masonry and flood elimination. Managed critical path schedule to make sure that the project was delivered on time. Responsible for oversight and management of multiple subcontractors through coordination and review of two-week look-ahead schedule along with the project plans to avoid deadtime, impedances, and/ or safety violations. Coordinated access and activities in public spaces to minimize impact to the client, students, staff, visitors, etc. Managed the project scope, change orders, RFls, budgets, and procurement of resources. Performed quality control verification through inspection and documentation of doily construction activities to ensure compliance with contract requirements and ovoid NCRs. Generated and processed SOV, payment requisitions, additional work/ change order proposals, and negotiation of values. Provided HS&E management, facilitation, and creation of site safety plans and other safety documentation/programs; shop drawings and layouts; and material product/technical data, and SDS submittals.
Coney Island Houses, Hurricane Sandy Restoration*, New York City Housing Authority {Brooklyn, NY) - Project Manager. roof replacement and exterior restoration project for Coney Island Houses. Following Superstorm Sandy, NYCHA was tasked with the monumental goal of repairing 33 damaged developments housing 60,000 residents and building them back stronger and more resilient.
Ocean Bay I Oceanside), Hurricane Sandy Restoration*, New York City Housing Authority (Queens, NY) - Project Engineer. In the aftermath of Superstorm Sandy, buildings on NYCHA developments were without electricity, heat, and hot waler. NYCHA' s recovery effort included major rehabilitation of building infrastructure, including the Ocean Boy housing development. The project included installation of emergency generators on roofs, replacement of electrical panels, and installation of connecting risers. Services included tracking and coordination of scheduled work with the general contractor. Responsible for creation of shop drawings, project status reports, submittals, job inventory, notifications of delay, quality control through RFls, identification of additional/ extra work, processing of change orders, and attending weekly progress meetings.
Shirley A. Chisholm Stale Office Building Restoration Project*, New York State Office of General Supply (New York, NY) - Assistant Project Manager. repair the Shirley A Chisholm State Office Building, which is a 13-story facility that houses l 2 state agencies. The scope of this project included window and door replacement; facade restoration; terracotta bond, water table, and cornice replacement; concrete restoration; sidewalk replacement; structural steel repair or replacement; mezzanine skylight and curtain wall replacement; acoustical ceiling repair or replacement; asbestos abatement; roof replacement; new metal siding installation; interior sheetrock and soffit installation; bulkhead demolition; roof parapet demolition; and waterproofing and rebuild. Responsible for management and coordination of critical path subcontractor (multiple) work to ensure minimal slip to the construction schedule; procurement and coordination of long lead items such as windows and doors, mezzanine skylight and curtain wall system, tapered insulation roof system, precasl concrete lintels, terracotta bands and cornices, roof metal siding system and soffits. Generated and coordinated submittals, RFls, additional work estimates with construction manager and architect/ engineer of record. Negotiated change orders based on additional work bulletins; performed monthly site safety walkthroughs and inspections with client safety management personnel; provided construction permits management; and conducted monthly payment requisition processing and negotiation. 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com On-Call Building Inspection Services, Los Angeles County Department of Public Works (Los Angeles County, CA) – Inspection Services Manager. Overseeing a team of building inspectors providing certified inspection coverage on a multitude of projects across various locations throughout the County. Upon notification from Los Angeles County that consultant inspection as sitance is required, presents options from qualified staff who meet the County’s certification requirements, and works with the County to ensure the selected candidate is fully prepared to protect the County’s interests.
Felicidad Water Main Replacement Design-Build, Anaheim Public Works Department (Anaheim, CA) – Contract Administrator.Water main replacement project that involves installing approximately 630 LF of 12 - inch and 3,960 LF of 8-inch ductile-iron pipe (DIP) as well as new water services and appurtenances at two project sites: Site 1 – Felicidad Street and Felicidad Circle (1,350 LF of 8-inch DIP) and Site 2 – Freedom Avenue, Liberty Avenue, National Avenue, American Avenue (630 LF of 12-inch DIP and 2,610 LF of 8-inch DIP). The project also includes traffic control, removal and restoration of existing improvements, excavation, backfill, shutdowns, dewatering, temporary high-lining of water service, hydrant installation, coordination with water service customers,chlorination, dichlorination, pressure testing, and site cleanup.
Knott Avenue Water Main Replacement – Phase 1 Design-Build, Anaheim Public Works Department (Anaheim, CA) – Contract Administrator/Construction Manager.Providing contract administration and construction management services that includes administrating design workshops and progress meetings and reviewing and processing submittals, RFIs, progress billings, and as needed extra work orders for the duration of this water main replacement design-build project located on Knott Avenue.
Opal Avenue & Eagle Drive Water Main Replacement Design-Build, Anaheim Public Works Department (Anaheim, CA) – Contract Administrator/Construction Manager.Providing contract administration and construction management services, including administrating design workshops and progress meetings and reviewing and processing submittals, RFIs, progress billings, and as needed extra work orders for the duration of this water main replacement design-build project located on Opal Avenue and Eagle Drive.
Miscellaneous Water Vault Nos. 10, 25, 49, and 94 Rehabilitations, Anaheim Public Works Department (Anaheim, CA) – Construction Manager. project that involves the abandonment of vaults and associated pipes and appurtenances, as well as replacing electrical facilities and installing water line connections.
Miscellaneous Water Vault Nos. 26, 33, and 55 Rehabilitations, Anaheim Public Works Department (Anaheim, CA) – Construction Manager. Project involves the abandonment of vaults and associated pipes and appurtenances as well as replacing electrical facilities and installing water line connections.
Santa Ana Street Railroad Water Main Crossing with Metrolink/SCRRA, Anaheim Public Works Department (Anaheim, CA) – Assistant Construction Manager. This project consists of boring and jacking trenchless installation method, furnishing, and installing approximately 70 LF of 24 -inch steel casing pipe (1/2 -inch thickness) welded joints and 12-inch zinc-coated ductile iron pipe class 56 and by open-cut construction method, furnishing and installing approximately 75 LF of 12 -inch zinc-coated ductile iron pipe class 52. Work also consisted of installing fittings, appurtenances, all valves, and thrust blocks, abandon in place existing water main and water services including interfering portions removal and disposal, pressure test and disinfect the water pipeline, and restoring the site to the original conditions including paving and striping restoration and disposal off site.
Orangewood Avenue Improvements (from State College Boulevard to the Santa Ana River), Anaheim Public Works Department (Anaheim, CA) – Assistant Construction Manager. Road widening project on Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
On-Coll Building Inspection Services, Los Angeles County Department of Public Works (Los Angeles County, CA) - Inspection Services Manager. Overseeing a team of building inspectors providing certified inspection coverage on a multitude of projects across various locations throughout the County. Upon notification from Los Angeles County that consultant inspection assistance is required, presents options from qualified staff who meet the County's certification requirements, and works with the County to ensure the selected candidate is fully prepared to protect the County's interests.
Felicidad Water Main Replacement Design-Build, Anaheim Public Works Department (Anaheim, CA) - Contract Administrator. Water main replacement project that involves installing approximately 630 LF of 12- inch and 3,960 LF of 8-inch ductile-iron pipe (DIP) as well as new water services and appurtenances at two project sites: Site 1 - Felicidad Street and Felicidad Circle (1,350 LF of 8-inch DIP) and Site 2 - Freedom Avenue, Liberty Avenue, National Avenue, American Avenue (630 LF of 12-inch DIP and 2,610 LF of 8-inch DIP). The project also includes traffic control, removal and restoration of existing improvements, excavation, backfill, shutdowns, dewotering, temporary high-lining of water service, hydrant installation, coordination with water service customers, chlorination, dichlorination, pressure testing, and site cleanup.
Knott Avenue Water Main Replacement - Phase 1 Design-Build, Anaheim Public Works Department (Anaheim, CA) - Contract Administrator/Construction Manager. Providing contract administration and construction management services that includes administrating design workshops and progress meetings and reviewing and processing submittals, RFls, progress billings, and as needed extra work orders for the duration of this water main replacement design-build project located on Knott Avenue.
Opal Avenue & Eagle Drive Water Main Replacement Design-Build, Anaheim Public Works Department (Anaheim, CA) - Contract Administrator/Construction Manager. Providing contract administration and construction management services, including administrating design workshops and progress meetings and reviewing and processing submittals, RFls, progress billings, and as needed extra work orders for the duration of this water main replacement design-build project located on Opal Avenue and Eagle Drive.
Miscellaneous Water Vault Nos. 10, 25, 49, and 94 Rehabilitations, Anaheim Public Works Department (Anaheim, CA) - Construction Manager. project that involves the abandonment of vaults and associated pipes and appurtenances, as well as replacing electrical facilities and installing water line connections.
Miscellaneous Water Vault Nos. 26, 33, and 55 Rehabilitations, Anaheim Public Works Department (Anaheim, CA) - Construction Manager. Project involves the abandonment of vaults and associated pipes and appurtenances as well as replacing electrical facilities and installing water line connections.
Sonia Ana Street Railroad Water Main Crossing with Metrolink/SCRRA, Anaheim Public Works Department (Anaheim, CA) - Assistant Construction Manager. This project consists of boring and jocking trenchless installation method, furnishing, and installing approximately 70 LF of 24-inch steel casing pipe ( l /2-inch thickness) welded joints and 12-inch zinc-coated ductile iron pipe class 56 and by open-cut construction method, furnishing and installing approximately 75 LF of 12-inch zinc-coated ductile iron pipe class 52. Work also consisted of installing fittings, appurtenances, all valves, and thrust blocks, abandon in place existing water main and water services including interfering portions removal and disposal, pressure test and disinfect the water pipeline, and restoring the site to the original conditions including paving and striping restoration and disposal off site.
Orangewood Avenue Improvements (from State College Boulevard to the Santa Ano River), Anaheim Public Works Department (Anaheim, CA) - Assistant Construction Manager. Rood widening project on 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com Orangewood Avenue from State College Boulevard to the Santa Ana River. This project spans a largely commercial area within proximity to several freeways and highways (SR -57, SR -55, SR -22, and I-5) along the south entrance to Angel Stadium of Anaheim. This widening project consists of electrical undergrounding with telecommunication lines relocation, installation of new City of Anaheim and City of Orange water mainline, traffic signal improvements, and a new variable message board. Widening improvements incl ude, but are not limited to, roadway widening and paving, sidewalks, slough walls, curbs and gutters, retaining/block/sound walls, driveways, cross gutters and spandrels, drainage improvements, catch basins, WQMP BMP improvements, Disney Resort-Style hardscape and landscaping, irrigation improvements, and signing and striping.
Telecommunication Poles Coordination and Inspection, Anaheim Public Works Department (Anaheim, CA) – Assistant Coordinator/Inspector. smart communication effort through its development and permitting services. Coordinates and schedules inspections for three different telecommunication companies’ contractors.
Inspects the installation of the streetlight po le foundations as well as traffic control for various related work in accordance with the approved permits and plans. Reviews and delivers closeout submitt al packages for the acceptance of the newly installed streetlight pole and facilitates turnover to City of Anaheim Public Utilities Department. Maintains a daily log and time tracking for over 100 ongoing permits.
Alamitos Beach Concession, Long Beach Public Works Department (Long Beach, CA) – Inspector. construction of a two-story beach concession stand/restaurant and two auxiliary buildings. Responsibilities include submittal review, meeting preparation, keeping RFI log up to date, logging and file inspection requests and reports, assist in preparing independent cost estimates and updating plan sheets. The City had become concerned that the contractor would potentially be taking on too much work outside of his demo nstrated expertise and improperly staffing the job to maintain both field and office progress. The City selected the Ardurra PM/CM team to assist the contractor in keeping the project on track and able to deliver a successful project to the City. Ardurra provides documents control services to streamline the workload and lessen the budget needed to complete the project .
Palos Verdes Estates Guardrail Replacement Project, Palos Verdes Public Works Department (Palos Verdes, CA) – Inspector. The Project consists of the construction of approximately one -half mile of existing metal beam guardrail replacement to the California Department of Transportation (Caltrans) Midwest Guardrail System (MGS) standards. The purpose of this project is to improve roadway safety and the construction phase for the project is funded by the Federal Highway Safety Improvement Program (HSIP) and loc al funds and will be contracted in accordance with the Caltrans Local Assistance Procedures Manual (LAPM). The Project encompasses 11 locations, and the work includes upgrading existing metal beam guardrails to MGS standards, including new end treatments and beam sections, and relocating guardrails.
Construction Management and Inspection Services for the Equipping of Well Commission 22A (O0746), Long Beach Water Department, (Long Beach, CA)– Inspector. Construction of this equipping of water well Commission 22A project located in El Dorado Park North. This project is part of a program to enhance and expand the use of local water supplies to meet the increasing demands within LBWD’s service area and enhance the LBWD’s local groundwater supply portfolio. The project is divided into the following phases: demolition; well equipping; conveyance pipeline; and ultimately, startup and testing. The first p hase involves demolishing the existing Commission 22 site and its existing electrical systems, existing CMU structure, and existing above- and below-grade piping. Work also involves the equipping of Commission 22A and associated site improvement, includinginstallation of new pump and motor, new CMU enclosure, Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
Orangewood Avenue from State College Boulevard to the Santa Ana River. This project spans a largely commercial area within proximity to several freeways and highways (SR-57, SR-55, SR-22, and 1-5) along the south entrance to Angel Stadium of Anaheim. This widening project consists of electrical undergrounding with telecommunication lines relocation, installation of new City of Anaheim and City of Orange water mainline, traffic signal improvements, and a new variable message board. Widening improvements include, but are not limited to, roadway widening and paving, sidewalks, slough walls, curbs and gutters, retaining/block/ sound walls, driveways, cross gutters and spandrels, drainage improvements, catch basins, WQMP BMP improvements, Disney Resort-Style hardscape and landscaping, irrigation improvements, and signing and striping.
Telecommunication Poles Coordination and Inspection, Anaheim Public Works Department (Anaheim, CA) -Assistant Coordinator/Inspector. smart communication effort through its development and permitting services. Coordinates and schedules inspections for three different telecommunication companies' contractors.
Inspects the installation of the streetlight pole foundations as well as traffic control for various related work in accordance with the approved permits and plans. Reviews and delivers closeout submittal packages for the acceptance of the newly installed streetlight pole and facilitates turnover to City of Anaheim Public Utilities Department. Maintains a daily log and time tracking for over 1 00 ongoing permits.
Alamitos Beach Concession, long Beach Public Works Department (long Beach, CA) - Inspector. construction of a two-story beach concession stand/restaurant and two auxiliary buildings. Responsibilities include submittal review, meeting preparation, keeping RFI log up to date, logging and file inspection requests and reports, assist in preparing independent cost estimates and updating plan sheets. The City had become concerned that the contractor would potentially be toking on too much work outside of his demonstrated expertise and improperly staffing the job to maintain both field and office progress. The City selected the Ardurra PM/CM team to assist the contractor in keeping the project on track and able to deliver a successful project to the City. Ardurra provides documents control services to streamline the workload and lessen the budget needed to complete the project.
Palos Verdes Estates Guardrail Replacement Project, Palos Verdes Public Works Department {Palos Verdes, CA) - Inspector. The Project consists of the construction of approximately one-half mile of existing metal beam guardrail replacement to the California Department of Transportation (Caltrans) Midwest Guardrail System (MGS) standards. The purpose of this project is to improve roadway safety and the construction phase for the project is funded by the Federal Highway Safety Improvement Program (HSIP) and local funds and will be contracted in accordance with the Caltrans Local Assistance Procedures Manual (LAPM). The Project encompasses 11 locations, and the work includes upgrading existing metal beam guardrails to MGS standards, including new end treatments and beam sections, and relocating guardrails.
Construction Management and Inspection Services for the Equipping of Well Commission 22A (0- 07 46}, Long Beach Water Department, {Long Beach, CA) - Inspector. Construction of this equipping of water well Commission 22A project located in El Dorado Park North. This project is part of a program to enhance and expand the use of local water supplies to meet the increasing demands within LBWD's service area and enhance the LBWD1
s local groundwater supply portfolio. The project is divided into the following phases: demolition; well equipping; conveyance pipeline; and ultimately, startup and testing. The first phase involves demolishing the existing Commission 22 site and its existing electrical systems, existing CMU structure, and existing above- and below-grade piping. Work also involves the equipping of Commission 22A and associated site improvement, including installation of new pump and motor, new CMU enclosure, 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com installation of piping to connect to the existing 24 -inch groundwater collection main, and associated electrical work. The project also involves complex phasing of SCADA equipment and controls to ensure operational control, as this site controls other well sites.
Ocean Place Construction Management and Inspection, Seal Beach Public Works Department (Seal Beach, CA) – Inspector. Project included providing grading and construction of the road and utility infrastructure supporting Ocean Place, which is a neighborhood of 30 luxury homes in an environmentally sensitive beachfront location which included street improvements, storm drains, domestic water and sanitary sewer lines.
*Work performed prior to joining Ardurra
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
installation of piping to connect to the existing 24-inch groundwater collection main, and associated electrical work. The project also involves complex phasing of SCADA equipment and controls to ensure operational control, as this site controls other well sites.
Ocean Place Construction Management and Inspection, Seal Beach Public Works Department (Seal Beach, CA) - Inspector. Project included providing grading and construction of the road and utility infrastructure supporting Ocean Place, which is a neighborhood of 30 luxury homes in an environmentally sensitive beachfront location which included street improvements, storm drains, domestic water and sanitary sewer lines.
*Work performed prior to joining Ardurra
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
JOSEPH MULLANEY, EIT
ASSOCIATE ENGINEER / PROJECT CONTROLS ENGINEER
QUALIFICATIONS
Joseph possesses 17 years of experience providing civil engineering services in the public arena working with various municipalities. Joseph’s experience includes providing support in the areas of traffic engineering, construction project management, and land development. He also has extensive experience in the design, investigation, and coordination of fiber optic systems and wireless telecommunication facilities.
He is known for his ability to multi -task efficiently on projects, providing clients with a broad range of services. He is consistently professional and exercises sound judgment in handling all matters.
PROJECT EXPERIENCE
Redondo Beach Residential Street Rehabilitation Cycle 2, Phase 4, City of Redondo Beach (Redondo Beach, CA) – Project Controls Engineer for this project that includes the construction of sidewalk, curb, gutter, cross gutter and spandrel, driveways, ADA ramps, asphalt concrete pavement, asphalt concrete overlay, HMA, base repairs, cold milling, utility adjustments,raffic signs, striping and markings, and landscaping. Responsibilities include assisting with coordination of site meetings, generating meeting minutes, processing and maintaining working files and organization of file structure, managing submittals, invoices, change orders, and other management tasks as needed.
Grove Ave. at Holt Blvd. Street and Trunk Sewer Improvements Project, City of Ontario (Ontario, CA) – Project Controls Engineer for this project that includes the construction of roadway improvements, sewer systems, storm drainage systems, water systems, grading, landscaping, traffic signals, street lighting, utilities and associated removals/relocations, and protection/relocation of existing facilities. Responsibilities include assisting with submittal management, generating meeting minutes, processing and maintaining working files and organization of file structure, managing submittals, invoices, change orders, and other management tasks as needed.
Manhattan Beach Advanced Traffic Signal (MBATS) System Project, City of Manhattan Beach (Manhattan Beach, CA) – Project Controls Engineer for this project that includes the upgrade and connection of signal controller equipment through a fiber optic backbone infrastructure that will support emerging traffic management technologies, such as dynamic signal timing, vehicle-to-vehicle communication, autonomous vehicles, public safety preemption, and other smart cities initiatives that can improve traffic signalization and operational efficiencies. The infrastructure will enable enhanced signal timing, relieve congestion during peak hours, improve traffic
PROFESSIONAL
REGISTRATION
Engineer in Training
California No. 22461
EDUCATION
BS, Civil Engineering,
University of Massachusetts,
Lowell, 2008
SOFTWARE
AutoCAD
ArcGIS
Office Suite
CIPO
BLUEBEAM
YEAR
ENTERED PROFESSION
2008
ARDURRA HIRE
2024
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
JOSEPH MULLANEY, Ell
ASSOCIATE ENGINEER/ PROJECT CONTROLS ENGINEER
QUALIFICATIONS
Joseph possesses 17 years of experience providing civil engineering services in the public arena working with various municipalities. Joseph's experience includes providing support in the areas of traffic engineering, construction project management, and land development. He also hos extensive experience in the design, investigation, and coordination of fiber optic systems and wireless telecommunication facilities.
He is known for his ability lo multi-task efficiently on projects, providing clients with a broad range of services. He is consistently professional and exercises sound judgment in handling all matters.
PROJECT EXPERIENCE
Redondo Beach Residential Street Rehabilitation Cycle 2, Phase 4, City of Redondo Beach (Redondo Beach, CA) - Project Controls Engineer for this project that includes the construction of sidewalk, curb, gutter, cross gutter and spondrel, driveways, ADA romps, asphalt concrete pavement, asphalt concrete overlay, HMA, base repairs, cold milling, utility adjustments, traffic signs, striping and markings, and landscaping. Responsibilities include assisting with coordination of site meetings, generating meeting minutes, processing and maintaining working files and organization of file structure, managing submittols, invoices, change orders, and other management tasks as needed.
Grove Ave. at Holt Blvd. Street and Trunk Sewer Improvements Project, City of Ontario (Ontario, CA) - Project Controls Engineer for this project that includes the construction of roadway improvements, sewer systems, storm drainage systems, water systems, grading, landscaping, traffic signals, street lighting, utilities and associated removals/ relocations, and protection/relocation of existing facilities. Responsibilities include assisting with submittal management, generating meeting minutes, processing and maintaining working files and organization of file structure, managing submittals, invoices, change orders, and other management tasks as needed.
Manhattan Beach Advanced Traffic Signal (MBATS) System Project, City of Manhattan Beach (Manhattan Beach, CA) - Project Controls Engineer for this project that includes the upgrade and connection of signal controller equipment through a fiber optic backbone infrastructure that will support emerging traffic management technologies, such as dynamic signal timing, vehicle-to-vehicle communication, autonomous vehicles, public safety preemption, and other smart cities initiatives that can improve traffic signalization and operational efficiencies. The infrastructure will enable enhanced signal timing, relieve congestion during peak hours, improve traffic 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com progression, allow the system to be more responsive to changes in traffic conditions, and prepare for the future of more Internet of Things (IOT) communications. The project will allow both City/County staff and a semi-autonomous control system to remotely monitor and control the signalized intersections to maximize synchronization and minimize backups through real -time data analysis and timing changes.
McAdam Park Renovation Project, City of Palmdale (Palmdale, CA) – Project Controls Engineer for this project that includes the installation of a new prefabricated restroom and concession stand building, pre - engineering storage room, baseball field and dugout, fencing, landscape and irrigation improvements, sports lighting, site and ADA improvements, monument sign, and additional parking lot paving and striping improvements.
Belmont Plaza Pool Rebuild/Revitalization Project, City of Long Beach (Long Beach, CA) – Document Controls Engineer for this project that includes the construction of a world -class aquatic center on the former site of the historic Belmont Plaza Olympic Pool. Responsibilities include assisting with coordination of plan review and comments, updating and preparing addendum for bid purposes, logging bidder questions and architect responses, and other management tasks as needed.
Manhattan Beach Pier Railing Replacement (Project No. D-929), City of Manhattan Beach (Manhattan Beach, CA) – Inspector for this project that included the replacement of railing along the Manhattan Beach Pier as well as partially along a segment of an existing bicycle trail and lower parking lot; repairs to concrete and concrete curbs on and adjacent to the rails;and replacement of two existing wooden stairs that provide beach access. All work performed preserves the Pier’s historic look.
Ceramic Studios Kiln Installation (Project No. D-937), City of Manhattan Beach (Manhattan Beach, CA) – Alternate Inspector for this project that included the installation of a new kiln at the existing Ceramic Studios Building, construction of a new shade structure (including new concrete footings) with equipment pad for ceramics kiln, and relevant mechanical, electrical and plumbing (gas) connections.
Manhattan Beach Blvd. Resurfacing Project (Aviation Blvd. to Inglewood Ave.), City of Redondo Beach (Redondo Beach, CA) – Alternate Inspector for this project that included improvements to sidewalk, median, ADA ramp, and driveway concrete work, pavement grind and overlay, landscaping, and signing/striping.
Manhattan Village Senior Villas ADA Pathway Project (Project No. T-250), City of Manhattan Beach (Manhattan Beach, CA) – Inspector for this ADA pathway project to replace missing sidewalk and provide senior residents safe and dedicated access from their community to the public sidewalk and Metro bus stop on Parkview Avenue. The project included the path of travel from the public right-of-way to the Manhattan Village Senior Villas and soccer field restroom; new ADA switchback ramp and stairs; new pedestrian marked pathway; ADA-compliant parking, striping and signage; and modified parking lot landscaping.
Carson Street Beautification Project (Norwalk Blvd. to Bloomfield Ave.), City of Hawaiian Gardens (Hawaiian Gardens, CA) – Alternate Inspector for this project that included sidewalk, median, ADA ramp, and driveway concrete work, pavement grind and overlay, landscaping, street lighting and signing/striping.
Responsibilities include managing construction activities, performing project coordination with the City and surrounding businesses, responding to RFIs, reviewing submittals, processing change orders, tr acking construction quantities, reviewing monthly progress payments, coordinating project changes requested by residents and approved by the City, managing construction schedules, providing public outreach to coordinate work impacting nearby residents and businesses, and responding to claims.
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
progression, allow the system to be more responsive to changes in traffic conditions, and prepare for the future of more Internet of Things (IOT) communications. The project will allow both City/County staff and a semi-autonomous control system to remotely monitor and control the signalized intersections to maximize synchronization and minimize backups through real-time data analysis and timing changes.
McAdam Park Renovation Project, City of Palmdale (Palmdale, CA) - Project Controls Engineer for this project that includes the installation of a new prefabricated restroom and concession stand building, preengineering storage room, baseball field and dugout, fencing, landscape and irrigation improvements, sports lighting, site and ADA improvements, monument sign, and additional parking lot paving and striping improvements.
Belmont Plaza Pool Rebuild/Revitalization Project, City of Long Beach (Long Beach, CA) - Document Controls Engineer for this project that includes the construction of a world-class aquatic center on the former site of the historic Belmont Plaza Olympic Pool. Responsibilities include assisting with coordination of plan review and comments, updating and preparing addendum for bid purposes, logging bidder questions and architect responses, and other management tasks as needed.
Manhattan Beach Pier Railing Replacement (Project No. D-929), City of Manhattan Beach (Manhattan Beach, CA) - Inspector for this project that included the replacement of railing along the Manhattan Beach Pier as well as partially along a segment of an existing bicycle trail and lower parking lot; repairs to concrete and concrete curbs on and adjacent to the rails; and replacement of two existing wooden stairs that provide beach access. All work performed preserves the Pier's historic look.
Ceramic Studios Kiln Installation (Project No. D-937), City of Manhattan Beach (Manhattan Beach, CA) - Alternate Inspector for this project that included the installation of a new kiln at the existing Ceramic Studios Building, construction of a new shade structure (including new concrete footings) with equipment pad for ceramics kiln, and relevant mechanical, electrical and plumbing (gas) connections.
Manhattan Beach Blvd. Resurfacing Project (Aviation Blvd. to Inglewood Ave.), City of Redondo Beach (Redondo Beach, CA) - Alternate Inspector for this project that included improvements to sidewalk, median, ADA ramp, and driveway concrete work, pavement grind and overlay, landscaping, and signing/ striping.
Manhattan Village Senior Villas ADA Pathway Project (Project No. T-250), City of Manhattan Beach (Manhattan Beach, CA) - Inspector for this ADA pathway project to replace missing sidewalk and provide senior residents safe and dedicated access from their community to the public sidewalk and Metro bus stop on Parkview Avenue. The project included the path of travel from the public right-of-way to the Manhattan Village Senior Villas and soccer field restroom; new ADA switchback ramp and stairs; new pedestrian marked pathway; ADA-compliant parking, striping and signage; and modified parking lot landscaping.
Carson Street Beautification Project (Norwalk Blvd. to Bloomfield Ave.), City of Hawaiian Gardens (Hawaiian Gardens, CA) - Alternate Inspector for this project that included sidewalk, median, ADA ramp, and driveway concrete work, pavement grind and overlay, landscaping, street lighting and signing/ striping.
Responsibilities include managing construction activities, performing project coordination with the City and surrounding businesses, responding to RFls, reviewing submittals, processing change orders, tracking construction quantities, reviewing monthly progress payments, coordinating project changes requested by residents and approved by the City, managing construction schedules, providing public outreach to coordinate work impacting nearby residents and businesses, and responding to claims. 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Bloomfield Park Play Area Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com Wireless Permit Technician Engineer,Rancho Palos Verdes, CA – Joseph received small cell wireless applications, reviewed submittals and plans for FCC and City regulation compliance, prepared and dispatched correction memoranda for submittals, conducted field review and verification of cell site installations, and isue permits for cell site maintenance and installations in the public right -of-way.
Assistant Traffic Engineer,Compton, CA* – Joseph investigated citizen requests and monitored traffic counts, speed surveys, plan revisions, stop sign warrant analysis, speed calming assessments, speed hump eligibility policy, and field data collection. He designed detour plans, site plans, and work orders.
Field Engineer, Laguna Beach, CA* – Joseph conducted a traffic safety assessment field review, which included evaluation for ADA-compliant facilities, assessment of intersection visibility, site exhibits for roadway geometrics, and traffic control devices.
Assistant Traffic Engineer, Eastvale, CA* – Joseph created site plans and work orders for advance street name signs, performed stop warrant analysis, conducted field review, data collection, and assisted in updating the engineering and traffic survey.
Public Works Inspector,Pomona, CA* – Joseph performed construction inspection services for private infrastructure. Inspections included demolition, removal of hazardous materials, grading and excavation, storm drain, sewer pipe and structures for placement and shading, curb and gutter, sidew alk and pedestrian ramps, and asphalt for placement and temperatures.
Fuel Modification Supervisor,Rancho Palos Verdes, CA* – Joseph conducted project coordination for the citywide clearing of vegetation and non-native brush within the City’s open space properties. He organized pre-construction meetings, monitored and observed multiple contract services, coordinated with outside agencies involved in nature preserves, evaluated invoices, maintained project files, and submitted daily reports.
Assistant Traffic Engineer,Oxnard, CA* – Joseph prepared work orders for installing and removing traffic control devices, responded to client inquiries related to traffic operations, and conducted temporary traffic control plan check and comments per CA MUTCD. He monitored traffic counts, speed surveys, plan revisions, stop sign warrant analysis, and field work.
Plan Check Engineer, Maywood, Costa Mesa, and Seal Beach, CA* – Joseph provided temporary traffic control plan check and comment per CA MUTCD.
Field Engineer, Maywood, CA* – Joseph used ArcGIS to do citywide sign surveys (field data collection).
Field Engineer, South Pasadena, CA* – Joseph conducted stop sign warrant analysis (field data collection and analysis).
Field Engineer, Palm Desert, CA* – Joseph monitored the intersection and stop sign warrant analysis. * Work performed prior to Ardurra
Bloomfield Park Play Area Improvements Proiect
City of Lakewood
December 02, 2024
Wireless Permit Technician Engineer, Rancho Polos Verdes, CA - Joseph received small cell wireless applications, reviewed submittals and plans for FCC and City regulation compliance, prepared and dispatched correction memoranda for submittals, conducted field review and verification of cell site installations, and issue permits for cell site maintenance and installations in the public right-of-way.
Assistant T roffic Engineer, Compton, CA* - Joseph investigated citizen requests and monitored traffic counts, speed surveys, plan revisions, stop sign warrant analysis, speed calming assessments, speed hump eligibility policy, and field data collection. He designed detour plans, site plans, and work orders.
Field Engineer, Laguna Beach, CA* - Joseph conducted a traffic safety assessment field review, which included evaluation for ADA-compliant facilities, assessment of intersection visibility, site exhibits for roadway geometrics, and traffic control devices.
Assistant Traffic Engineer, Eastvale, CA* - Joseph created site plans and work orders for advance street name signs, performed stop warrant analysis, conducted field review, data collection, and assisted in updating the engineering and traffic survey.
Public Works Inspector, Pomona, CA* - Joseph performed construction inspection services for private infrastructure. Inspections included demolition, removal of hazardous materials, grading and excavation, storm drain, sewer pipe and structures for placement and shading, curb and gutter, sidewalk and pedestrian ramps, and asphalt for placement and temperatures.
Fuel Modification Supervisor, Rancho Palos Verdes, CA* - Joseph conducted project coordination for the citywide clearing of vegetation and non-native brush within the City's open space properties. He organized pre-construction meetings, monitored and observed multiple contract services, coordinated with outside agencies involved in nature preserves, evaluated invoices, maintained project files, and submitted daily reports.
Assistant Traffic Engineer, Oxnard, CA* - Joseph prepared work orders for installing and removing traffic control devices, responded to client inquiries related to traffic operations, and conducted temporary traffic control plan check and comments per CA MUTCD. He monitored traffic counts, speed surveys, plan revisions, stop sign warrant analysis, and field work.
Plan Check Engineer, Maywood, Costa Mesa, and Seal Beach, CA* - Joseph provided temporary traffic control plan check and comment per CA MUTCD.
Field Engineer, Maywood, CA* - Joseph used ArcGIS to do citywide sign surveys (field data collection).
Field Engineer, South Pasadena, CA* - Joseph conducted slop sign warrant analysis (field data collection and analysis).
Field Engineer, Palm Desert, CA* - Joseph monitored the intersection and stop sign warrant analysis. * Work performed prior to Ardurra
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com
TO: The Honorable Mayor and City Council
COUNCIL AGENDA
December 09, 2025
SUBJECT: Award of Bid for Public Works Projects No. 2024-10 Cherry Cove Playground Improvements
INTRODUCTION
On November 24, 2025, the City Clerk received eight bids for the Cherry Cove Playground Improvements project. The work generally consists of removing and disposing of the existing play equipment and sand, salvaging existing benches and a trash can for reuse, and removing concrete around the play area. New improvements include the furnishing, assembly, and installation of new ADA-compliant play equipment; construction of a rock sump; installation of rubber safety surfacing and benches; construction of new concrete panels and integral-colored concrete banding around the perimeter of the play area; reinstallation of existing benches and a trash can; replacement of existing concrete around the perimeter of the play pit; repair of turf areas damaged during construction activities, including soil preparation, reseeding, and sod installation with proper irrigation coverage; and other miscellaneous improvements as shown in the contract documents.
STATEMENT OF FACT
Fifteen contractors purchased plans and specifications, and eight submitted a bid proposal. The bid results are summarized below:
1 Western State Builders $381,298.50
2 Micon Construction $394,167.75
3 R.E. Schultz $398,654.00
4 Savi Construction $458,549.55
5 DD Svsterns $469,342.93
6 Shiraz Construction $477,777.00
7 Emoire DesiQTI and Build $562,500.00
8 Monet Construction $673,350.00
The lowest responsible bidder is Western State Builders Inc. in the base bid amount of $381,298.50. Staff have verified with the State Contractors License Board that Western State Builders Inc. is properly licensed for the work. References contacted by staff provided favorable comments on the quality of their work and they have completed similar types of work for various public agencies. Staff also recommend that a contingency of approximately 15% be included, since
3.3.b
Award of Bid for Public Works Projects No. 2024-10
Cherry Cove Playground Improvements
December 9, 2025
there could be unforeseen, unexpected conditions, once construction begins. There are adequate funds in the project account for this work.
The consulting engineering firm of Ardurra has an agreement with the City of Lakewood to assist with various engineering matters. Staff have requested a proposal to provide project management, contract administration, construction materials testing and inspection, and construction observation for the project. The proposal is in the amount of $50,000 and staff recommend also authorizing a contingency allowance for this work in the amount of $12,850, for a total amount of $62,850.
FISCAL IMPACT
The Cherry Cove Playground replacement project is funded through a combination of Measure A Maintenance and Servicing Program (Measure A M&S) grant funds administered by the Los Angeles County Regional Park and Open Space District (RPOSD) and locally administered Measure L funds. The City's Seven-Year Capital Improvement Program (CIP) previously identified and programmed $441,000 in Measure A M&S funds for this project. In addition, the CIP budget included $70,000 in Measure L funds to provide design assistance, construction management, and inspection funding. Sufficient funds are available within the approved CIP for this project. No additional General Fund appropriation is required.
Funding
MeasureAM&S MeasureL Toral
$ 441,000.00 • 70,000.00 $ 511,000.00
CIP Plan Appropriation ' 441,000.00 ' 70,000.00 $ 511,000.00 Expense
Measure A MeasureL Total Expense AccountString
$441,000.00 $62,8~O.OO $ 503,650.00
Western State Builders Inc. $381,298.50 $ 381,298.50 PlC:-12622-MEMMS-CON-CHEARYCOV Ardurra $62,850 ' 62,850.00 PlD/2622-MEAL-CMI-CHERRYCOV Contlngency 59,701.50 ' 59,701.50 P1CV2622-MEMMS-CGT-CHERAYCOV Prev[ously Encumbered Design Funds $ • 7,150.00 $ 7,150.00
SUMMARY
Bids have been received on Public Works Contracts 24-10. Staff recommend the contract be awarded to the lowest responsible bidder, Western State Builders Inc. in the amount of $381,298.50 from account PlCV2622-MEAAMS-CON-CHERRYCOV, and that $59,701.50 in project funds be authorized for contingency purposes from account PI CV2622-MEAAMS-CGTCHERR YCOV. Staff also recommends authorizing the proposal from Adurra for construction management services in the amount of $62,850 from account PICV2622-MEAL-CMICHERRYCOV.
Award of Bid for Public Works Projects No. 2024-10
Cherry Cove Playground Improvements
December 9, 2025
RECOMMENDATION
Staff recommends that the City Council:
(I) Adopt the plans, specifications, and working details for the subject project. (2) Award a contract for the "Cherry Cove Playground Improvements", Public Works Contracts 2024-10, in the amount of$381,298.50 to the lowbidderWestem State Builders Inc. and authorize the Mayor to sign the contract in a form approved by the City Attorney.
(3) Authorize staff to approve a cumulative total of change orders, as necessary not to exceed $59,701.50.
RECOMMENDATION - Continued
(4) Authorize Ardurra's proposal to provide the construction management assistance, under their existing Agreement for Engineering Services, in an amount of$62,850, and authorize the Mayor to sign the proposal.
Kelli Pickler \:s'
Director of Public Works
-;?u
Thaddeus McCormack
//-11/c ~
City Manager
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com December02, 202 5
Sam Chambers
Public WorksProject Manager
City of Lakewood
5050 Clark Avenue
Lakewood, CA 90712
SUBJECT: PROPOSAL TO PROVIDE PART-TIME CONSTRUCTION MANAGEMENT,
INSPECTION, AND MATERIAL TESTING SERVICES FOR THE CITY OF LAKEWOOD CHERRY COVE PARK PLAYGROUND IMPROVEMENTS PROJECT .
Dear Sam,
Ardurra Group, Inc. (Ardurra) is pleased to submit this proposal to the City of Lakewood (City) forpart-time professional Construction Management, Inspection, and Material Testing services for the City of Lakewood Cherry Cove Park Playground Improvements Project .
We appreciate the opportunity to present our qualifications and approach toward delivering this project on time and within budget. As an experienced and reliable civil engineering, construction management and inspection firm, the Ardurra team offers the fo llowing benefits to the City:
▪ Strong leadership for successfulproject delivery. Gafur Oyewo willserve as the designated construction manager. Gafur brings over15 years ofproject/ construction management and inspection experience, and has provided construction management services to the City of Lakewood on other CIP park improvement projects. Gafur is familiar with City of Lakewood personnel and proceduresand isskilled at managing multiple projects. He understandsthe importance of high-level coordination efforts and interdepartmental coordination as it relates to the Cherry Cove Park Playground ImprovementsProject. Supporting Gafur with field inspections will be Ardurra Public Works Inspector Joe Mullaney.
▪ Team built for success: Together, and with the support of our talented project controls staff and our subconsultant, Ninyo & Moore for soils compaction testing, theproposed teamwill competently represent the City in the field and will advocate for the City’sbestintereststhroughout the duration of the project.
▪ Peace of mind through each phase of your project. Our professionals have years of experience managing a wide variety of public works projects—from scoping, design, and construction to closeout and commissioning. Our time-tested, proactive approach will help us anticipate and expeditiously address challenges, keepingtheproject moving forward. Our proven process minimizesunexpected challenges, provides predictability, and streamlines the delivery process.
A/
ARDURRA
December 02, 2025
Sam Chambers
Public Works Project Manager
City of Lakewood
5050 Clark Avenue
Lakewood, CA 9071 2
SUBJECT: PROPOSAL TO PROVIDE PART-TIME CONSTRUCTION MANAGEMENT,
INSPECTION, AND MATERIAL TESTING SERVICES FOR THE CITY OF LAKEWOOD CHERRY COVE PARK PLAYGROUND IMPROVEMENTS PROJECT.
Dear Sam,
Ardurra Group, Inc. (Ardurra) is pleased to submit this proposal to the City of Lakewood (City) for part-time professional Construction Management, Inspection, and Material Testing services for the City of Lakewood Cherry Cove Park Playground Improvements Project.
We appreciate the opportunity to present our qualifications and approach toward delivering this project on time and within budget. As an experienced and reliable civil engineering, construction management and inspection firm, the Ardurra team offers the following benefits to the City:
Strong leadership for successful project delivery. Gafur Oyewo will serve as the designated construction manager. Gofur brings over 1 5 years of project/ construction management and inspection experience, and has provided construction management services to the City of Lakewood on other CIP park improvement projects. Gafur is familiar with City of Lakewood personnel and procedures and is skilled at managing multiple projects. He understands the importance of high-level coordination efforts and interdepartmental coordination as it relates to the Cherry Cove Park Playground Improvements Project. Supporting Gafur with field inspections will be Ardurra Public Works Inspector Joe Mullaney.
Team built for success: Together, and with the support of our talented project controls staff and our subconsultant, Ninyo & Moore for soils compaction testing, the proposed team will competently represent the City in the field and will advocate for the City's best interests throughout the duration of the project.
Peace of mind through each phase of your project. Our professionals have years of experience managing a wide variety of public works projects-from scoping, design, and construction to closeout and commissioning. Our time-tested, proactive approach will help us anticipate and expeditiously address challenges, keeping the project moving forward. Our proven process minimizes unexpected challenges, provides predictability, and streamlines the delivery process. 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com Ardurra has engaged Ninyo & Moore, a Geotechnical firm, to observe the contractor’s compaction efforts and provide sampling and testing during subgrade preparation, aggregate base placement , and concrete sampling and testing.
We appreciate the opportunity to submit this proposal and look forward to working with the City on the successful delivery of this project . Please feel free to contact me at ( 612 ) 232 -4318 or [email protected] should you have any questions or require additional information.
Respectfully submitted,
Ardurra Group, Inc.
Gafur Oyewo
Contract Administration & Inspection Group Leader
cc: Dino D’Emilia, PE, F.ASCE, QSD
Omar Alameddine
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
Ardurra has engaged Ninyo & Moore, a Geotechnical firm, to observe the contractor's compaction efforts and provide sampling and testing during subgrade preparation, aggregate base placement, and concrete sampling and testing.
We appreciate the opportunity lo submit this proposal and look forward to working with the City on the successful delivery of this project. Please feel free to contact me at (612) 232-4318 or [email protected] should you have any questions or require additional information.
Respectfully submitted,
Contract Administration & Inspection Group Leader
cc: Dino D'Emilio, PE, F.ASCE, QSD
Omar Alameddine
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
PROJECT UNDERSTANDING
Ardurra understands that the City seeksto retain a qualified consultant to provide part-time professional Construction Management, Inspection, and Material Testing services for the City of Lakewood Cherry Cove Park Playground Improvements Project . The project includesbut is not limited to demolition, grading, concrete foundations, PCC sidewalk replacement, removal of existing play equipmentand sand, furnish and installnew play equipmentand EPDM rubber play surfacing, gravel drain, and miscellaneous related improvements as required.The details of the project are as defined in the bid documents for “ Cherry Cove Park Playground Improvements Project ” approved on October 29, 2025.
The construction cost is estimated to be $431,677.62 with the project anticipated to be complete within 90 workingdays following issuance of the notice to proceed (NTP). The project is anticipated tostart in January 2025 .
SCOPE OF SERVICES
CONSTRUCTION MANAGEMENT & INSPECTION SERVICES
Due to the City’s budget constraints, constructionmanagement and inspection services are proposed to be on a limited, part-time, and as-needed basis and may includesome or all of the tasks listed below, within the approved budget allocation and corresponding level of effort . ▪ Collaborate and work cooperatively with the City’s Project Manager assigned to the project. ▪ Act as the City’s representative and monitor that the actions taken are in line with the City’s policy, philosophy, strategy, and standards.
▪ Coordinate between the Contractor and City’s PM as needed. ▪ Assist the City’s PM with responding to requests for information (RFIs) and submittals as needed. ▪ Assist the City’s PM with reviewing, analyzing, negotiating, and recommending for approval of change orders (potential and actual) as needed.
▪ Assist the City’s PM with reviewing the construction schedule provided by the Contractor. Request and assist with reviewing the updated schedule from the Contractor when actual progress deviates from the baseline schedule as needed.
▪ Assist the City’s PM as needed with reviewingand recommending for approval progress payments.
Present any disputed items and recommend non -disputed items for payment, as needed. ▪ Monitor compliance with the City’s Quality Management Plan (QAP) and/or plans, specifications, and referenced standards as applicable.
▪ Assist in monitoring Contractor’s implementation and maintenance of SWPPP / BMP measures as applicable and as needed.
▪ Provide support to the City’s PM in addressing and resolvingfield problems as needed. ▪ Track pending inspection issues and follow upuntil issues are resolved, as needed. ▪ Assist the City’s PM with project closeout and filing of the Notice of Completion and Release of Retention, as needed.
▪ Review and familiarization with contract documents.
▪ Participate in pre-construction meetings and other meetings and conferences that are led by the City’s PM, as needed.
PROJECT UNDERSTANDING
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
Ardurra understands that the City seeks to retain a qualified consultant to provide part-time professional Construction Management, Inspection, and Material Testing services for the City of Lakewood Cherry Cove Park Playground Improvements Project. The project includes but is not limited to demolition, grading, concrete foundations, PCC sidewalk replacement, removal of existing play equipment and sand, furnish and install new play equipment and EPDM rubber play surfacing, gravel drain, and miscellaneous related improvements as required. The details of the project are as defined in the bid documents for "Cherry Cove Park Playground Improvements Project" approved on October 29, 2025.
The construction cost is estimated to be $431,677.62 with the project anticipated to be complete within 90 working days following issuance of the notice to proceed (NTP}. The project is anticipated to start in January 2025.
SCOPE OF SERVICES
CONSTRUCTION MANAGEMENT & INSPECTION SERVICES
Due to the City's budget constraints, construction management and inspection services are proposed to be on a limited, part-time, and as-needed basis and may include some or all of the tasks listed below, within the approved budget allocation and corresponding level of effort.
Collaborate and work cooperatively with the City' s Project Manager assigned to the project.
Act as the City's representative and monitor that the actions taken are in line with the City's policy, philosophy, strategy, and standards.
Coordinate between the Contractor and City's PM as needed.
Assist the City's PM with responding to requests for information (RFls) and submittals as needed.
Assist the City's PM with reviewing, analyzing, negotiating, and recommending for approval of change orders (potential and actual} as needed.
Assist the City's PM with reviewing the construction schedule provided by the Contractor. Request and assist with reviewing the updated schedule from the Contractor when actual progress deviates from the baseline schedule as needed.
Assist the City's PM as needed with reviewing and recommending for approval progress payments.
Present any disputed items and recommend non-disputed items for payment, as needed.
Monitor compliance with the City's Quality Management Plan [QAP) and/ or plans, specifications, and referenced standards as applicable.
Assist in monitoring Contractor's implementation and maintenance of SWPPP / BMP measures as applicable and as needed.
Provide support to the City's PM in addressing and resolving field problems as needed.
Track pending inspection issues and follow up until issues are resolved, as needed.
Assist the City's PM with project closeout and filing of the Notice of Completion and Release of Retention, as needed.
Review and familiarization with contract documents.
Participate in pre-construction meetings and other meetings and conferences that are led by the City's PM, as needed.
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com ▪ Assist theCity’s Project Manager (PM), monitor, and expedite the Contractor’s proposed construction schedule.
▪ Monitor and document the Contractor’s compliance with plans, specifications, and referenced standards.
▪ Assist as needed in the review of “submittals” required by the specifications. ▪ Assist as needed with coordination between PM, Contractor, and any other entities that may be involved.
▪ Review Contractor performance and expedite corrective measures for discrepancies as they occur. ▪ Coordinate and provide assistance and direction to technicians performing material tests. Measure the work-in-place to verify quantities.
▪ Monitor testing results and require Contractor to take corrective actions if results are unsatisfactory. ▪ Assist the City with public outreach. Document and respond to public inquiries, monitor and document compliance with working hours, noise levels, and dust mitigation requirements. ▪ Review and make recommendations for the processing of payment requests. ▪ Assist as needed with the consideration, negotiation, and processing of change orders. ▪ Identify items requiring corrective action by either the contractor or the City. Monitor and document timely corrective actions implemented by the contractor. ▪ Develop punch list items and monitor corrections made.
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
Assist the City's Project Manager (PM), monitor, and expedite the Contractor's proposed construction schedule.
Monitor and document the Contractor's compliance with plans, specifications, and referenced standards.
Assist as needed in the review of "submittals" required by the specifications.
Assist as needed with coordination between PM, Contractor, and any other entities that may be involved.
Review Contractor performance and expedite corrective measures for discrepancies as they occur.
Coordinate and provide assistance and direction to technicians performing material tests. Measure the work-in-place to verify quantities.
Monitor testing results and require Contractor to take corrective actions if results are unsatisfactory.
Assist the City with public outreach. Document and respond to public inquiries, monitor and document compliance with working hours, noise levels, and dust mitigation requirements.
Review and make recommendations for the processing of payment requests.
Assist as needed with the consideration, negotiation, and processing of change orders.
Identify items requiring corrective action by either the contractor or the City. Monitor and document timely corrective actions implemented by the contractor.
Develop punch list items and monitor corrections made.
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
ESTIMATED FEE ALLOWANCE
Notes: Terms and conditions shall be pursuant to the City of Lakewood Engineering and Project Management Support Services Contract dated June 15, 2023.
Assumptions: Based on Ardurra’s project understanding t he following assumptions have been made in the preparation of our estimated fee:
1. Services will be provided during the General Contractor’s Contract Completion Time.
2. Services are proposed on an as-needed, part-time basis as feasible within the allocated budget.
3. Ardurra will not exceed the budgeted levels of effort unless directed/approved by the City in writing.
4. Ardurra’s Project Field Representative services are limited to the tasks detailed in the scope of services above during the part-time level of effort budgeted in the proposed fee below.
5. To the extent feasible, work completed by the Contractor during durations when the Ardurra Field Representative is absent from the site will be observed on subsequent visit. Ardurra will not be responsible for monitoring work that is covered during its ab sence from the site.
Exclusions to Scope and Fee: The following items are specifically excluded:
1. Legal advice
2. Temporary field office facilities, equipment, furniture, utilities and/or services
3. Observation of work performed by Contractor during hours that Ardurra is not scheduled to be on site
4. Night, weekend, or special shift work
5. Construction labor, materials and/or equipment
90 Working Days
TITLE
Est. Hours
Per Day Total Hours Hourly Rate
Extended
Fee
Senoir Construction Manager - - $ 281.00 $ 10,000.00
Public Works Inspector (Prevailing Wage) - - $ 214.00 $ 23,000.00 Project Controls Engineer - - $ 184.00 $ 7,500.00
Document Control/Admin - - $ 147.00 $ 1,000.00
Material Testing (Allowance) $ 8,500.00
Subtotal Construction $ 50,000.00
$ 50,000.00
Optional Services
Item Amount
Additional Construction Management (Allowance) $ 25,290.00 Additional Material Testing (Allowance) $ 5,000.00
Total Optional Services $ 30,290.00
Estimated Fee
Construction Management, Inspection, and Material Testing Services For the Cherry Cove Park Playground Improvements Project City of Lakewood
Total Estimated Fee
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
Senoir Construction Manager
ESTIMATED FEE ALLOWANCE
Estimated Fee
Construction Management, Inspection, and Material Testing Services For the Cherry Cove Park Playground Improvements Project City of Lakewood
90 Working Days
Est. Hours
Total Hours Hourly Rate TITLE Per Day
$ 281.00
Public Works Ins ector(Prevailin Wa e) $ 214.00
Pro· ect Controls En ineer $ 184.00
Document Control/ Adm in $ 147.00
Material T estin (Allowance)
Extended
Fee
$ 10,000.00
$ 23,000.00
$ 7,500.00
$ 1,000.00
$ 8,500.00
Notes: Terms and conditions shall be pursuant to the City of Lakewood Engineering and Project Management Support Services Contract dated June 15, 2023.
Assumptions: Based on Ardurra's project understanding the following assumptions have been made in the preparation of our estimated fee:
l. Services will be provided during the General Contractor's Contract Completion Time.
2. Services are proposed on an as-needed, part-time basis as feasible within the allocated budget.
3. Ardurra will not exceed the budgeted levels of effort unless directed/ approved by the City in writing.
4. Ardurra's Project Field Representative services ore limited to the tasks detailed in the scope of services above during the part-time level of effort budgeted in the proposed fee below.
5. To the extent feasible, work completed by the Co ntractor during durations when the Ardurra Field Representative is absent from the site will be observed on subsequent visit. Ardurra will not be responsible for monitoring work that is covered during its absence from the site.
Exclusions to Scope and Fee: The following items are specifically excluded:
l. Legal advice
2. Temporary field office facilities, equipment, furniture, utilities and/ or services
3. Observation of work performed by Contractor during hours that Ardurra is not scheduled to be on site
4. Night, w eekend, or special shift work
5. Construction labor, materials and/ or equipment
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
6. Additional services not specifically called for in the proposal.
7. Expert witness services
8. Standby services
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
6. Additional services not specifically called for in the proposal.
7. Expert witness services
8. Standby services
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
RESUMES
GAFUR OYEWO
INSPECTION SERVICES MANAGER/SENIOR CONSTRUCTION MANAGER
QUALIFICATIONS
Gafur Oyewo brings 1 5 years of project and construction management experience, with proficiency in large-scale public works project administrative and management processes such as critical path management (CPM), project scope management, payment/requisition processing, and safety management. He has extensive knowledge in commercial and residential property rehabilitation and restoration as well as floating and fixed marine asset dry-docking and repair. His experience spans projects involving a diverse rangeof installations, which include landscaping, roofing, asbestos abatement, masonry, steel structure erection, concrete, electrical, plumbing, and interior renovation.
PROJECT EXPERIENCE
Tot Lot Playground Improvements to Biscailuz Park & Playground Improvements to Boyar Park,Lakewood Department of Public Works (Lakewood, CA) – Construction Manager for this project thatincludes infrastructure improvements at two parks within the city of Lakewood. Project scope includes removal of existing sand, play equipment and concrete foundations, grading, removal and replacement of chain link fabric, installation of new Owner Furnished Contractor Installed (OFCI) play equipment, new resilient rubberized surfacing, and miscellaneous related improvements at Biscailuz and Boyar Parks. Provided construction management and inspection services in the field and ensured contractor compliance with plans and specifications.
Mary K. Giordano Regional Transit Center, Torrance Public Works Department (Torrance, CA) – Inspector for thisflagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers.
This LEED v2009 Gold project included a 15,000 -square-foot building that accommodates a transit store, an operator layover area with amenities, offices, security office/post communications room, training/conference room, storage room, and the ability to house areas for small retail use. The 5 -acre terminal facility provides eight bus berths; a 250-space parking lot; a passenger dropoff zone; eight bicycle lockers; electric car charging station infrastructure; CCTV security cameras; and anti-vandalism/anti-skating devices. The project also involved offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard, and construction of an extension of 208th Street. 2024 Merit Award, ACEC California
EDUCATION
MS Asset Integrity
Management
Robert Gordon University,
Aberdeen, Scotland
BEng Naval Architecture State
University of New York
Maritime College
CERTIFICATIONS
OSHA 10-Hour Construction &
Safety
OSHA 30-Hour Construction &
Safety
PROFESSIONAL
AFFILIATIONS
Royal Institution of Naval
Architects
Society of Naval Architects
and Marine Engineers
SOFTWARE
Microsoft Project, Primavera
P6, AutoCAD, GHS, NavCad,
Rhinoceros, Maxsurf,
Hydromax, Hullspeed,
Hecsalv, ShipConstructor,
Seekeeper
YEAR ENTERED
PROFESSION
2010
ARDURRA HIRE
2021
RESUMES
GAFUR OYEWO
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
INSPECTION SERVICES MANAGER/SENIOR CONSTRUCTION MANAGER
QUALIFICATIONS
Gafur Oyewo brings 15 years of project and construction management experience, with proficiency in large-scale public works project administrative and management processes such as critical path management {CPM), project scope management, payment/requisition processing, and safety management. He has extensive knowledge in commercial and residential property rehabilitation and restoration as well as floating and fixed marine asset dry-docking and repair. His experience spans projects involving a diverse range of installations, which include landscaping, roofing, asbestos abatement, masonry, steel structure erection, concrete, electrical, plumbing, and interior renovation.
PROJECT EXPERIENCE
Tot Lot Playground Improvements to Biscailuz Park & Playground Improvements lo Boyar Park, Lakewood Department of Public Works (Lakewood, CA) - Construction Manager for this project that includes infrastructure improvements at two parks within the city of Lakewood. Project scope includes removal of existing sand, play equipment and concrete foundations, grading, removal and replacement of chain link fabric, installation of new Owner Furnished Contractor Installed (OFCI} play equipment, new resilient rubberized surfacing, and miscellaneous related improvements at Biscailuz and Boyar Parks. Provided construction management and inspection services in the field and ensured contractor compliance with plans and specifications.
Mary K. Giordano Regional Transit Center, Torrance Public Works Department (Torrance, CA) - Inspector for this flagship terminal for the City's l l -route agency, Torrance Transit, and other public transportation providers.
This LEED v2009 Gold project included a 15,000-square-foot building that accommodates a transit store, an operator layover area with amenities, offices, security office/ post communications room, training/ conference room, storage room, and the ability to house areas for small retail use. The 5 -acre terminal facility provides eight bus berths; a 250-space parking lot; a passenger dropoff zone; eight bicycle lockers; electric car charging station infrastructure; CCTV security cameras; and anti-vandalism/ anti-skating devices. The project also involved offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard, and constructio n of an extension of 208th Street. 2 024 M erit Award, A CEC California
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com Redondo Beach South Bay Regional Intermodal Transit Center, City of Redondo Beach (Redondo Beach, CA) – Alternate Inspector. The new $13.2-million LEED-certified transit center includes a 2,900-SF building that houses an operator lounge, passenger waiting area with restrooms, and offices. Other improvements included a kiss-and-ride parking lot and passenger drop-off area, as well as 11 bus bays, signalized crosswalks, traffic signals, striping, and an upper-level parking lot. 2024 Merit Award, ACEC California; 2023 Project Achievement Award for Transportation, CMAA Southern California; and 2023 BEST Project of the Year (Facilities), APWA Southern California
Polliwog Park Lower Playground Replacement Project, Manhattan Beach Public Works (Manhattan Beach, CA ) – Alternate Construction Manager.Projectincludes the removal and replacement of out -of-service play equipment, play surface, fencing, as well as renovation of parking lots and walkways. The new playground will include a pirate and beach themed playground designed using a community consensus pro cess, complete with new play surfaces and shade structures.
Belmont Plaza Pool Rebuild/Revitalization Project, Long Beach Public Works Department (Long Beach, CA) – Assistant Project Manager. Project consists of the construction of a world -class aquatics facility which will replace the now-demolished Belmont Olympic Pool. The new facility will host swimming, water polo and platform diving events at the local, regional, and national levels. Ardu rra is representing the City and its interests in all negotiations, meetings, community outreach, entitlements, permitting, designmanagement and related activities throughout the project. Helped prepare an application to the California Coastal Commission for a Coastal Development Permit. Ardurra is spearheading value engineering analyses and a subsequent entitlement and community outreach project to adjust the project to available funding sources.
Borough of Manhattan Community College Entrance Plaza Rehabilitation*, Dormitory Authority of the State of New York (New York, NY) – Project Manager. Project involved rehabilitation of the entrance plaza through major landscaping upgrades. Work performed included, but was not limited to, removal and disposal of existing landscaping; rehabilitation of planter boxes; demolition of existin g concrete slab; excavation of sub-grade soil to establish tree pit large enough to accept CU structural soil for tree stab ilization, planting soil, and placement landscaping (trees and shrubs); and relocation or disposal of above -grade cylindrical concrete planters using heavy lift cranes. Ensured landscaping subcontractor’s preconstruction product submittals (soil analysis, certificates, etc.), test results (compaction/proctor, sieve analysis, etc.), and post - construction maintenance and warranty submittals satisfactory to contract requirements.
Performed quality control verification through oversight, inspection, and documentation of installation/daily construction activities, ensuring tree rootball stabilization mechanisms were installed and located per contract drawings and to avoid non-conformance reports (NCR). Efficiently coordinated activities between landscaping and electrical subcontractors, ensuring tree/planter lighting was installed satisfactorily.
Managed critical path schedule, ensuring long lead items such as trees and shrubs on plan ting schedule, sloped planter boxes, etc., were procured, delivered, and planted/installed during planting season.
Additional responsibilities included oversight and management of multiple subcontractors (roofing, asbestos abatement, concrete, electrical, plumbing, and structural steel) through coordination and review of two -week look-ahead schedule, and access to work areas along with the project phasing plans, to avoid deadtime, impedances, and/or safety violations. Management of project scope, change orders, requests for information (RFI), budgets, and procurement of resources. Generation and processing schedule of values (SOV), payment requisitions, additional work/change order proposals, and negotiation of values. Provided health, safety, and environment (HS&E) management, facilitation, and creation of site safety plans and other safety Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
Redondo Beach South Bay Regional lntermodal Transit Center, City of Redondo Beach (Redondo Beach, CA) - Alternate Inspector. The new $13.2-million LEED-certified transit center includes o 2, 900-SF building that houses an operator lounge, passenger waiting area with restrooms, and offices. Other improvements included a kiss-and-ride parking lot and passenger drop-off area, as well as 11 bus bays, signalized crosswalks, traffic signals, striping, and on upper-level parking lot. 2024 Merit Award, ACEC California; 2023 Proiect Achievement Award for Transportation, CMAA Southern California; and 2023 BEST Pro;ect of the Year (Facilities), APWA Southern California
Polliwog Pork Lower Playground Replacement Project, Monhotton Beach Public Works (Monhotton Beach, CA) - Alternate Construction Manager. Project includes the removal and replacement of out-of-service ploy equipment, ploy surface, fencing, as well as renovation of parking lots and walkways. The new playground will include a pirate and beach themed playground designed using a community consensus process, complete with new play surfaces and shade structures.
Belmont Plaza Pool Rebuild/Revitalization Project, Long Beach Public Works Department (Long Beach, CA) - Assistant Project Manager. Project consists of the construction of a world-class aquatics facility which will replace the now-demolished Belmont Olympic Pool. The new facility will host swimming, water polo and platform diving events at the local, regional, and national levels. Ardurra is representing the City and its interests in all negotiations, meetings, community outreach, entitlements, permitting, design management and related activities throughout the project. Helped prepare an application to the California Coastal Commission for a Coastal Development Permit. Ardurra is spearheading value engineering analyses and o subsequent entitlement and community outreach project to adjust the project to available funding sources.
Borough of Manhattan Community College Entrance Plaza Rehabilitation*, Dormitory Authority of the State of New York (New York, NY) - Project Manager. Project involved rehabilitation of the entrance plaza through major landscaping upgrades. Work performed included, but was not limited to, removal and disposal of existing landscaping; rehabilitation of planter boxes; demolition of existing concrete slab; excavation of sub-grade soil to establish tree pit large enough to accept CU structural soil for tree stabilization, planting soil, and placement landscaping {trees and shrubs); and relocation or disposal of above-grade cylindrical concrete planters using heavy lift crones. Ensured landscaping subcontractor's preconstruction product submittals (soil analysis, certificates, etc.), test results (compaction/proctor, sieve analysis, etc.), and postconstruction maintenance and warranty submittals satisfactory to contract requirements.
Performed quality control verification through oversight, inspection, and documentation of installation/ daily construction activities, ensuring tree rootboll stabilization mechanisms were installed and located per contract drawings and to avoid non-conformance reports (NCR). Efficiently coordinated activities between landscaping and electrical subcontractors, ensuring tree/ planter lighting was installed satisfactorily.
Managed critical path schedule, ensuring long lead items such as trees and shrubs on planting schedule, sloped planter boxes, etc., were procured, delivered, and planted/ installed during planting season.
Additional responsibilities included oversight and management of multiple subcontractors (roofing, asbestos abatement, concrete, electrical, plumbing, and structural steel) through coordination and review of two-week look-ahead schedule, and access to work areas along with the project phasing plans, to avoid deadtime, impedances, and/ or safety violations. Management of project scope, change orders, requests for information (RFI), budgets, and procurement of resources. Generation and processing schedule of values (SOV), payment requisitions, additional work/ change order proposals, and negotiation of values. Provided health, safety, and environment (HS&E) management, facilitation, and creation of site safety plans and other safety 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com documentation/programs; shop drawings and layouts; and material product/technical data, and safety data sheet (SDS) submittals.
P.S. 811 M – Mickey Mantle School Rehabilitation*, New York City School Construction Authority (New York, NY) – Project Manager. Project included exterior masonry and flood elimination. Managed critical path schedule to make sure that the project was delivered on time. Responsible for oversight and management of multiple subcontractors through coordination and revi ew of two-week look-ahead schedule along with the project plans to avoid deadtime, impedances, and/or safety violations. Coordinated access and activities in public spaces to minimize impact to the client, students, staff, visitors, etc. Managed the project scope, change orders, RFIs, budgets, and procurement of resources. Performed quality control verification through inspection and documentation of daily construction activities to ensure compliance with contract requirements and avoid NCRs. Generated and processed SOV, payment requisitions, additional work/change order proposals, and negotiation of values. Provided HS&E management, facilitation, a nd creation of site safety plans and other safety documentation/programs; shop drawings and layouts; and material product/technical data, and SDS submittals.
Coney Island Houses, Hurricane Sandy Restoration*, New York City Housing Authority (Brooklyn, NY) – Project Manager. roof replacement and exterior restoration project for Coney Island Houses. Following Superstorm Sandy, NYCHA was tasked with the monumental goal of repairing 33 damaged developments housing 60,000 residents and building them back stronger and more resilient.
Ocean Bay (Oceanside), Hurricane Sandy Restoration*, New York City Housing Authority (Queens, NY) – Project Engineer. In the aftermath of Superstorm Sandy, buildings on NYCHA developments were without electricity, heat, and hot water. NYCHA’s recovery effort included major rehabilitation of building infrastructure, including the Ocean Bay housing development. The project included installation of emergency generators on roofs, replacement of electrical panels, and installation of connecting risers. Services included tracking and coordination of scheduled work with the general contractor. Responsible for creation of shop drawings, project status reports, submittals, job inventory, notifications of delay, quality control through RFIs, identification of additional/extra work, processing of change orders, and attending weekly progress meetings.
Shirley A. Chisholm State Office Building Restoration Project*, New York State Office of General Supply (New York, NY) – Assistant Project Manager. repair the Shirley A. Chisholm State Office Building, which is a 13-story facility that houses 12 state agencies. The scope of this project included window and door replacement; facade restoration; terracotta band, water table, a nd cornice replacement; concrete restoration; sidewalk replacement; structural steel repair or replacement; mezzanine skylight and curt ain wall replacement; acoustical ceiling repair or replacement; asbestos abatement; roof replacement; new metal siding installation; interior sheetrock and soffit installation; bulkhead demolition; roof parapet demolition; and waterproofing and rebuild. Responsible for management and coordination of critical path subcontractor (multiple) work to ensure minimal slip to the construction schedule; procurement and coordination of long lead items such as windows and doors, mezzanine skylight and curtain wall sys tem, tapered insulation roof system, precast concrete lintels, terracotta bands and cornices, roof metal siding system and soffits. Generated and coordinated submittals, RFIs, additional work estimates with construction manager and architect/engineer of record. Negotiated change orders based on additional work bulletins; performed monthly site safety walkthroughs and inspections with client safety management personnel; provided construction permits management; and conducted monthly payment requisition proce ssing and negotiation.
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
documentation/programs; shop drawings and layouts; and material product/technical data, and safety data sheet {SDS) submittals.
P.S. 81 l M - Mickey Mantle School Rehabilitation*, New York City School Construction Authority (New York, NY) - Project Manager. Project included exterior masonry and flood elimination. Managed critical path schedule to make sure that the project was delivered on time. Responsible for oversight and management of multiple subcontractors through coordination and review of two-week look-ahead schedule along with the project plans to avoid deadtime, impedances, and/ or safety violations. Coordinated access and activities in public spaces to minimize impact to the client, students, staff, visitors, etc. Managed the project scope, change orders, RFls, budgets, and procurement of resources. Performed quality control verification through inspection and documentation of daily construction activities to ensure compliance with contract requirements and avoid NCRs. Generated and processed SOV, payment requisitions, additional work/ change order proposals, and negotiation of values. Provided HS&E management, facilitation, and creation of site safety plans and other safety documentation/programs; shop drawings and layouts; and material product/technical data, and SDS submittals.
Coney Island Houses, Hurricane Sandy Restoration*, New York City Housing Authority (Brooklyn, NY) - Project Manager. roof replacement and exterior restoration project for Coney Island Houses. Following Superstorm Sandy, NYCHA was tasked with the monumental goal of repairing 33 damaged developments housing 60,000 residents and building them back stronger and more resilient.
Ocean Bay I Oceanside), Hurricane Sandy Restoration*, New York City Housing Authority (Queens, NY) - Project Engineer. In the aftermath of Superstorm Sandy, buildings on NYCHA developments were without electricity, heat, and hot waler. NYCHA' s recovery effort included major rehabilitation of building infrastructure, including the Ocean Boy housing development. The project included installation of emergency generators on roofs, replacement of electrical panels, and installation of connecting risers. Services included tracking and coordination of scheduled work with the general contractor. Responsible for creation of shop drawings, project status reports, submittals, job inventory, notifications of delay, quality control through RFls, identification of additional/ extra work, processing of change orders, and attending weekly progress meetings.
Shirley A. Chisholm Stale Office Building Restoration Project*, New York State Office of General Supply (New York, NY) - Assistant Project Manager. repair the Shirley A Chisholm State Office Building, which is a 13-story facility thot houses l 2 state agencies. The scope of this project included window and door replacement; facade restoration; terracotta bond, water table, and cornice replacement; concrete restoration; sidewalk replacement; structural steel repair or replacement; mezzanine skylight and curtain wall replacement; acoustical ceiling repair or replacement; asbestos abatement; roof replacement; new metal siding installation; interior sheetrock and soffit installation; bulkhead demolition; roof parapet demolition; and waterproofing and rebuild. Responsible for management and coordination of critical path subcontractor (multiple) work to ensure minimal slip to the construction schedule; procurement and coordination of long lead items such as windows and doors, mezzanine skylight and curtain wall system, tapered insulation roof system, precasl concrete lintels, terracotta bands and cornices, roof metal siding system and soffits. Generated and coordinated submittals, RFls, additional work estimates with construction manager and architect/ engineer of record. Negotiated change orders based on additional work bulletins; performed monthly site safety walkthroughs and inspections with client safety management personnel; provided construction permits management; and conducted monthly payment requisition processing and negotiation. 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com On-Call Building Inspection Services, Los Angeles County Department of Public Works (Los Angeles County, CA) – Inspection Services Manager. Overseeing a team of building inspectors providing certified inspection coverage on a multitude of projects across various locations throughout the County. Upon notification from Los Angeles County that consultant inspection as sitance is required, presents options from qualified staff who meet the County’s certification requirements, and works with the County to ensure the selected candidate is fully prepared to protect the County’s interests.
Felicidad Water Main Replacement Design-Build, Anaheim Public Works Department (Anaheim, CA) – Contract Administrator.Water main replacement project that involves installing approximately 630 LF of 12 - inch and 3,960 LF of 8-inch ductile-iron pipe (DIP) as well as new water services and appurtenances at two project sites: Site 1 – Felicidad Street and Felicidad Circle (1,350 LF of 8-inch DIP) and Site 2 – Freedom Avenue, Liberty Avenue, National Avenue, American Avenue (630 LF of 12-inch DIP and 2,610 LF of 8-inch DIP). The project also includes traffic control, removal and restoration of existing improvements, excavation, backfill, shutdowns, dewatering, temporary high-lining of water service, hydrant installation, coordination with water service customers,chlorination, dichlorination, pressure testing, and site cleanup.
Knott Avenue Water Main Replacement – Phase 1 Design-Build, Anaheim Public Works Department (Anaheim, CA) – Contract Administrator/Construction Manager.Providing contract administration and construction management services that includes administrating design workshops and progress meetings and reviewing and processing submittals, RFIs, progress billings, and as needed extra work orders for the duration of this water main replacement design-build project located on Knott Avenue.
Opal Avenue & Eagle Drive Water Main Replacement Design-Build, Anaheim Public Works Department (Anaheim, CA) – Contract Administrator/Construction Manager.Providing contract administration and construction management services, including administrating design workshops and progress meetings and reviewing and processing submittals, RFIs, progress billings, and as needed extra work orders for the duration of this water main replacement design-build project located on Opal Avenue and Eagle Drive.
Miscellaneous Water Vault Nos. 10, 25, 49, and 94 Rehabilitations, Anaheim Public Works Department (Anaheim, CA) – Construction Manager. project that involves the abandonment of vaults and associated pipes and appurtenances, as well as replacing electrical facilities and installing water line connections.
Miscellaneous Water Vault Nos. 26, 33, and 55 Rehabilitations, Anaheim Public Works Department (Anaheim, CA) – Construction Manager. Project involves the abandonment of vaults and associated pipes and appurtenances as well as replacing electrical facilities and installing water line connections.
Santa Ana Street Railroad Water Main Crossing with Metrolink/SCRRA, Anaheim Public Works Department (Anaheim, CA) – Assistant Construction Manager. This project consists of boring and jacking trenchless installation method, furnishing, and installing approximately 70 LF of 24 -inch steel casing pipe (1/2 -inch thickness) welded joints and 12-inch zinc-coated ductile iron pipe class 56 and by open-cut construction method, furnishing and installing approximately 75 LF of 12 -inch zinc-coated ductile iron pipe class 52. Work also consisted of installing fittings, appurtenances, all valves, and thrust blocks, abandon in place existing water main and water services including interfering portions removal and disposal, pressure test and disinfect the water pipeline, and restoring the site to the original conditions including paving and striping restoration and disposal off site.
Orangewood Avenue Improvements (from State College Boulevard to the Santa Ana River), Anaheim Public Works Department (Anaheim, CA) – Assistant Construction Manager. Road widening project on Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
On-Coll Building Inspection Services, Los Angeles County Department of Public Works (Los Angeles County, CA) - Inspection Services Manager. Overseeing a team of building inspectors providing certified inspection coverage on a multitude of projects across various locations throughout the County. Upon notification from Los Angeles County that consultant inspection assistance is required, presents options from qualified staff who meet the County's certification requirements, and works with the County to ensure the selected candidate is fully prepared to protect the County's interests.
Felicidad Water Main Replacement Design-Build, Anaheim Public Works Department (Anaheim, CA) - Contract Administrator. Water main replacement project that involves installing approximately 630 LF of 12- inch and 3,960 LF of 8-inch ductile-iron pipe (DIP) as well as new water services and appurtenances at two project sites: Site 1 - Felicidad Street and Felicidad Circle (1,350 LF of 8-inch DIP) and Site 2 - Freedom Avenue, Liberty Avenue, National Avenue, American Avenue (630 LF of 12-inch DIP and 2,610 LF of 8-inch DIP). The project also includes traffic control, removal and restoration of existing improvements, excavation, backfill, shutdowns, dewotering, temporary high-lining of water service, hydrant installation, coordination with water service customers, chlorination, dichlorination, pressure testing, and site cleanup.
Knott Avenue Water Main Replacement - Phase 1 Design-Build, Anaheim Public Works Department (Anaheim, CA) - Contract Administrator/ Construction Manager. Providing contract administration and construction management services that includes administrating design workshops and progress meetings and reviewing and processing submittals, RFls, progress billings, and as needed extra work orders for the duration of this water main replacement design-build project located on Knott Avenue.
Opal Avenue & Eagle Drive Water Main Replacement Design-Build, Anaheim Public Works Department (Anaheim, CA) - Contract Administrator/Construction Manager. Providing contract administration and construction management services, including administrating design workshops and progress meetings and reviewing and processing submittals, RFls, progress billings, and as needed extra work orders for the duration of this water main replacement design-build project located on Opal Avenue and Eagle Drive.
Miscellaneous Water Vault Nos. 10, 25, 49, and 94 Rehabilitations, Anaheim Public Works Department (Anaheim, CA) - Construction Manager. project that involves the abandonment of vaults and associated pipes and appurtenances, as well as replacing electrical facilities and installing water line connections.
Miscellaneous Water Vault Nos. 26, 33, and 55 Rehabilitations, Anaheim Public Works Department (Anaheim, CA) - Construction Manager. Project involves the abandonment of vaults and associated pipes and appurtenances as well as replacing electrical facilities and installing water line connections.
Santa Ana Street Railroad Water Main Crossing with Metrolink/SCRRA, Anaheim Public W orks Department (Anaheim, CA) - Assistant Construction Manager. This project consists of boring and jocking trenchless installation method, furnishing, and installing approximately 70 LF of 24-inch steel casing pipe ( l /2-inch thickness) welded joints and 12-inch zinc-coated ductile iron pipe class 56 and by open-cut construction method, furnishing and installing approximately 75 LF of 12-inch zinc-coated ductile iron pipe class 52. Work also consisted of installing fittings, appurtenances, all valves, and thrust blocks, abandon in place existing water main and water services including interfering portions removal and disposal, pressure test and disinfect the water pipeline, and restoring the site lo the original conditions including paving and striping restoration and disposal off site.
Orangewood Avenue Improvements (from State College Boulevard to the Santa Ano River), Anaheim Public Works Departme nt {Anaheim, CA) - Assistant Construction Manager. Rood widening project on 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com Orangewood Avenue from State College Boulevard to the Santa Ana River. This project spans a largely commercial area within proximity to several freeways and highways (SR -57, SR -55, SR -22, and I-5) along the south entrance to Angel Stadium of Anaheim. This widening project consists of electrical undergrounding with telecommunication lines relocation, installation of new City of Anaheim and City of Orange water mainline, traffic signal improvements, and a new variable message board. Widening improvements incl ude, but are not limited to, roadway widening and paving, sidewalks, slough walls, curbs and gutters, retaining/block/sound walls, driveways, cross gutters and spandrels, drainage improvements, catch basins, WQMP BMP improvements, Disney Resort-Style hardscape and landscaping, irrigation improvements, and signing and striping.
Telecommunication Poles Coordination and Inspection, Anaheim Public Works Department (Anaheim, CA) – Assistant Coordinator/Inspector. smart communication effort through its development and permitting services. Coordinates and schedules inspections for three different telecommunication companies’ contractors.
Inspects the installation of the streetlight po le foundations as well as traffic control for various related work in accordance with the approved permits and plans. Reviews and delivers closeout submitt al packages for the acceptance of the newly installed streetlight pole and facilitates turnover to City of Anaheim Public Utilities Department. Maintains a daily log and time tracking for over 100 ongoing permits.
Alamitos Beach Concession, Long Beach Public Works Department (Long Beach, CA) – Inspector. construction of a two-story beach concession stand/restaurant and two auxiliary buildings. Responsibilities include submittal review, meeting preparation, keeping RFI log up to date, logging and file inspection requests and reports, assist in preparing independent cost estimates and updating plan sheets. The City had become concerned that the contractor would potentially be taking on too much work outside of his demo nstrated expertise and improperly staffing the job to maintain both field and office progress. The City selected the Ardurra PM/CM team to assist the contractor in keeping the project on track and able to deliver a successful project to the City. Ardurra provides documents control services to streamline the workload and lessen the budget needed to complete the project .
Palos Verdes Estates Guardrail Replacement Project, Palos Verdes Public Works Department (Palos Verdes, CA) – Inspector. The Project consists of the construction of approximately one -half mile of existing metal beam guardrail replacement to the California Department of Transportation (Caltrans) Midwest Guardrail System (MGS) standards. The purpose of this project is to improve roadway safety and the construction phase for the project is funded by the Federal Highway Safety Improvement Program (HSIP) and loc al funds and will be contracted in accordance with the Caltrans Local Assistance Procedures Manual (LAPM). The Project encompasses 11 locations, and the work includes upgrading existing metal beam guardrails to MGS standards, including new end treatments and beam sections, and relocating guardrails.
Construction Management and Inspection Services for the Equipping of Well Commission 22A (O0746), Long Beach Water Department, (Long Beach, CA)– Inspector. Construction of this equipping of water well Commission 22A project located in El Dorado Park North. This project is part of a program to enhance and expand the use of local water supplies to meet the increasing demands within LBWD’s service area and enhance the LBWD’s local groundwater supply portfolio. The project is divided into the following phases: demolition; well equipping; conveyance pipeline; and ultimately, startup and testing. The first phase involves demolishing the existing Commission 22 site and its existing electrical systems, existing CMU structure, and existing above- and below-grade piping. Work also involves the equipping of Commission 22A and associated site improvement, including installation of new pump and motor, new CMU enclosure, Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
Orangewood Avenue from State College Boulevard to the Santa Ana River. This project spans a largely commercial area within proximity to several freeways and highways (SR-57, SR-55, SR-22, and 1-5) along the south entrance to Angel Stadium of Anaheim. This widening project consists of electrical undergrounding with telecommunication lines relocation, installation of new City of Anaheim and City of Orange water mainline, traffic signal improvements, and a new variable message board. Widening improvements include, but are not limited to, roadway widening and paving, sidewalks, slough walls, curbs and gutters, retaining/block/ sound walls, driveways, cross gutters and spandrels, drainage improvements, catch basins, WQMP BMP improvements, Disney Resort-Style hardscape and landscaping, irrigation improvements, and signing and striping.
Telecommunication Poles Coordination and Inspection, Anaheim Public Works Department (Anaheim, CA) -Assistant Coordinator/Inspector. smart communication effort through its development and permitting services. Coordinates and schedules inspections for three different telecommunication companies' contractors.
Inspects the installation of the streetlight pole foundations as well as traffic control for various related work in accordance with the approved permits and plans. Reviews and delivers closeout submittal packages for the acceptance of the newly installed streetlight pole and facilitates turnover to City of Anaheim Public Utilities Department. Maintains a daily log and time tracking for over 1 00 ongoing permits.
Alamitos Beach Concession, long Beach Public Works Department (long Beach, CA) - Inspector. construction of a two-story beach concession stand/restaurant and two auxiliary buildings. Responsibilities include submittal review, meeting preparation, keeping RFI log up to date, logging and file inspection requests and reports, assist in preparing independent cost estimates and updating plan sheets. The City had become concerned that the contractor would potentially be taking on too much work outside of his demonstrated expertise and improperly staffing the job to maintain both field and office progress. The City selected the Ardurra PM/CM team to assist the contractor in keeping the project on track and able to deliver a successful project to the City. Ardurra provides documents control services to streamline the workload and lessen the budget needed to complete the project.
Palos Verdes Estates Guardrail Replacement Project, Palos Verdes Public Works Department {Palos Verdes, CA) - Inspector. The Project consists of the construction of approximately one-half mile of existing metal beam guardrail replacement to the California Department of Transportation (Caltrans) Midwest Guardrail System (MGS) standards. The purpose of this project is to improve roadway safety and the construction phase for the project is funded by the Federal Highway Safety Improvement Program (HSIP) and local funds and will be contracted in accordance with the Caltrans Local Assistance Procedures Manual (LAPM). The Project encompasses 11 locations, and the work includes upgrading existing metal beam guardrails to MGS standards, including new end treatments and beam sections, and relocating guardrails.
Construction Management and Inspection Services for the Equipping of Well Commission 22A (0- 07 46}, Long Beach Water Department, {Long Beach, CA) - Inspector. Construction of this equipping of water well Commission 22A project located in El Dorado Park N orth. This project is part of a program to enhance and expand the use of local water supplies to meet the increasing demands within LBWD's service area and enhance the LBWD1
s local groundwater supply portfolio. The project is divided into the following phases: demolition; well equipping; conveyance pipeline; and ultimately, startup and testing. The first phase involves demolishing the existing Commission 22 site and its existing electrical systems, existing CMU stru cture, and existing above- and below-grade piping. W ork also involves the equipping of Commission 22A and associated site improvement, including installation of new pump and motor, new CMU enclosure, 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com installation of piping to connect to the existing 24 -inch groundwater collection main, and associated electrical work. The project also involves complex phasing of SCADA equipment and controls to ensure operational control, as this site controls other well sites.
Ocean Place Construction Management and Inspection, Seal Beach Public Works Department (Seal Beach, CA) – Inspector. Project included providing grading and construction of the road and utility infrastructure supporting Ocean Place, which is a neighborhood of 30 luxury homes in an environmentally sensitive beachfront location which included street improvements, storm drains, domestic water and sanitary sewer lines.
*Work performed prior to joining Ardurra
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
installation of piping to connect to the existing 24-inch groundwater collection main, and associated electrical work. The project also involves complex phasing of SCADA equipment and controls to ensure operational control, as this site controls other well sites.
Ocean Place Construction Management and Inspection, Seal Beach Public Works Department (Seal Beach, CA) - Inspector. Project included providing grading and construction of the road and utility infrastructure supporting Ocean Place, which is a neighborhood of 30 luxury homes in an environmentally sensitive beachfront location which included street improvements, storm drains, domestic water and sanitary sewer lines.
*Work performed prior to joining Ardurra
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com
JOSEPH MULLANEY, EIT
ASSOCIATE ENGINEER / PROJECT CONTROLS ENGINEER
QUALIFICATIONS
Joseph possesses 17 years of experience providing civil engineering services in the public arena working with various municipalities. Joseph’s experience includes providing support in the areas of traffic engineering, construction project management, and land development. He also has extensive experience in the design, investigation, and coordination of fiber optic systems and wireless telecommunication facilities.
He is known for his ability to multi -task efficiently on projects, providing clients with a broad range of services. He is consistently professional and exercises sound judgment in handling all matters.
PROJECT EXPERIENCE
Redondo Beach Residential Street Rehabilitation Cycle 2, Phase 4, City of Redondo Beach (Redondo Beach, CA) – Project Controls Engineer for this project that includes the construction of sidewalk, curb, gutter, cross gutter and spandrel, driveways, ADA ramps, asphalt concrete pavement, asphalt concrete overlay, HMA, base repairs, cold milling, utility adjustments,raffic signs, striping and markings, and landscaping. Responsibilities include assisting with coordination of site meetings, generating meeting minutes, processing and maintaining working files and organization of file structure, managing submittals, invoices, change orders, and other management tasks as needed.
Grove Ave. at Holt Blvd. Street and Trunk Sewer Improvements Project, City of Ontario (Ontario, CA) – Project Controls Engineer for this project that includes the construction of roadway improvements, sewer systems, storm drainage systems, water systems, grading, landscaping, traffic signals, street lighting, utilities and associated removals/relocations, and protection/relocation of existing facilities. Responsibilities include assisting with submittal management, generating meeting minutes, processing and maintaining working files and organization of file structure, managing submittals, invoices, change orders, and other management tasks as needed.
Manhattan Beach Advanced Traffic Signal (MBATS) System Project, City of Manhattan Beach (Manhattan Beach, CA) – Project Controls Engineer for this project that includes the upgrade and connection of signal controller equipment through a fiber optic backbone infrastructure that will support emerging traffic management technologies, such as dynamic signal timing, vehicle-to-vehicle communication, autonomous vehicles, public safety preemption, and other smart cities initiatives that can improve traffic signalization and operational efficiencies. The infrastructure will enable enhanced signal timing, relieve congestion during peak hours, improve traffic
PROFESSIONAL
REGISTRATION
Engineer in Training
California No. 22461
EDUCATION
BS, Civil Engineering,
University of Massachusetts,
Lowell, 2008
SOFTWARE
AutoCAD
ArcGIS
Office Suite
CIPO
BLUEBEAM
YEAR
ENTERED PROFESSION
2008
ARDURRA HIRE
2024
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
JOSEPH MULLANEY, Ell
ASSOCIATE ENGINEER/ PROJECT CONTROLS ENGINEER
QUALIFICATIONS
Joseph possesses 17 years of experience providing civil engineering services in the public arena working with various municipalities. Joseph's experience includes providing support in the areas of traffic engineering, construction project management, and land development. He also hos extensive experience in the design, investigation, and coordination of fiber optic systems and wireless telecommunication facilities.
He is known for his ability lo multi-task efficiently on projects, providing clients with a broad range of services. He is consistently professional and exercises sound judgment in handling all matters.
PROJECT EXPERIENCE
Redondo Beach Residential Street Rehabilitation Cycle 2, Phase 4, City of Redondo Beach (Redondo Beach, CA) - Project Controls Engineer for this project that includes the construction of sidewalk, curb, gutter, cross gutter and spandrel, driveways, ADA ramps, asphalt concrete pavement, asphalt concrete overlay, HMA, base repairs, cold milling, utility adjustments, traffic signs, striping and markings, and landscaping. Responsibilities include assisting with coordination of site meetings, generating meeting minutes, processing and maintaining working files and organization of file structure, managing submittols, invoices, change orders, and other management tasks as needed.
Grove Ave. at Holt Blvd. Street and Trunk Sewer Improvements Project, City of Ontario (Ontario, CA) - Project Controls Engineer for this project that includes the construction of roadway improvements, sewer systems, storm drainage systems, water systems, grading, landscaping, traffic signals, street lighting, utilities and associated removals/ relocations, and protection/relocation of existing facilities. Responsibilities include assisting with submittal management, generating meeting minutes, processing and maintaining working files and organization of file structure, managing submittals, invoices, change orders, and other management tasks as needed.
Manhattan Beach Advanced Traffic Signal (MBATS) System Project, City of Manhattan Beach {Manhattan Beach, CA) - Project Controls Engineer for this project that includes the upgrade and connection of signal controller equipment through a fiber optic backbone infrastructure that will support emerging traffic management technologies, such as dynamic signal timing, vehicle-to-vehicle communication, autonomous vehicles, public safety preemption, and other smart cities initiatives that can improve traffic signalization and operational efficiencies. The infrastructure will enable enhanced signal timing, relieve congestion during peak hours, improve traffic 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com progression, allow the system to be more responsive to changes in traffic conditions, and prepare for the future of more Internet of Things (IOT) communications. The project will allow both City/County staff and a semi-autonomous control system to remotely monitor and control the signalized intersections to maximize synchronization and minimize backups through real -time data analysis and timing changes.
McAdam Park Renovation Project, City of Palmdale (Palmdale, CA) – Project Controls Engineer for this project that includes the installation of a new prefabricated restroom and concession stand building, pre - engineering storage room, baseball field and dugout, fencing, landscape and irrigation improvements, sports lighting, site and ADA improvements, monument sign, and additional parking lot paving and striping improvements.
Belmont Plaza Pool Rebuild/Revitalization Project, City of Long Beach (Long Beach, CA) – Document Controls Engineer for this project that includes the construction of a world -class aquatic center on the former site of the historic Belmont Plaza Olympic Pool. Responsibilities include assisting with coordination of plan review and comments, updating and preparing addendum for bid purposes, logging bidder questions and architect responses, and other management tasks as needed.
Manhattan Beach Pier Railing Replacement (Project No. D-929), City of Manhattan Beach (Manhattan Beach, CA) – Inspector for this project that included the replacement of railing along the Manhattan Beach Pier as well as partially along a segment of an existing bicycle trail and lower parking lot; repairs to concrete and concrete curbs on and adjacent to the rails;and replacement of two existing wooden stairs that provide beach access. All work performed preserves the Pier’s historic look.
Ceramic Studios Kiln Installation (Project No. D-937), City of Manhattan Beach (Manhattan Beach, CA) – Alternate Inspector for this project that included the installation of a new kiln at the existing Ceramic Studios Building, construction of a new shade structure (including new concrete footings) with equipment pad for ceramics kiln, and relevant mechanical, electrical and plumbing (gas) connections.
Manhattan Beach Blvd. Resurfacing Project (Aviation Blvd. to Inglewood Ave.), City of Redondo Beach (Redondo Beach, CA) – Alternate Inspector for this project that included improvements to sidewalk, median, ADA ramp, and driveway concrete work, pavement grind and overlay, landscaping, and signing/striping.
Manhattan Village Senior Villas ADA Pathway Project (Project No. T-250), City of Manhattan Beach (Manhattan Beach, CA) – Inspector for this ADA pathway project to replace missing sidewalk and provide senior residents safe and dedicated access from their community to the public sidewalk and Metro bus stop on Parkview Avenue. The project included the path of travel from the public right-of-way to the Manhattan Village Senior Villas and soccer field restroom; new ADA switchback ramp and stairs; new pedestrian marked pathway; ADA-compliant parking, striping and signage; and modified parking lot landscaping.
Carson Street Beautification Project (Norwalk Blvd. to Bloomfield Ave.), City of Hawaiian Gardens (Hawaiian Gardens, CA) – Alternate Inspector for this project that included sidewalk, median, ADA ramp, and driveway concrete work, pavement grind and overlay, landscaping, street lighting and signing/striping.
Responsibilities include managing construction activities, performing project coordination with the City and surrounding businesses, responding to RFIs, reviewing submittals, processing change orders, tracking construction quantities, reviewing monthly progress payments, coordinating project changes requested by residents and approved by the City, managing construction schedules, providing public outreach to coordinate work impacting nearby residents and businesses, and responding to claims.
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
progression, allow the system to be more responsive to changes in traffic conditions, and prepare for the future of more Internet of Things (IOT) communications. The project will allow both City/County staff and a semi-autonomous control system to remotely monitor and control the signalized intersections to maximize synchronization and minimize backups through real-time data analysis and timing changes.
McAdam Park Renovation Project, City of Palmdale (Palmdale, CA) - Project Controls Engineer for this project that includes the installation of a new prefabricated restroom and concession stand building, preengineering storage room, baseball field and dugout, fencing, landscape and irrigation improvements, sports lighting, site and ADA improvements, monument sign, and additional parking lot paving and striping improvements.
Belmont Plaza Pool Rebuild/Revitalization Project, City of Long Beach (Long Beach, CA) - Document Controls Engineer for this project that includes the construction of a world-class aquatic center on the former site of the historic Belmont Plaza Olympic Pool. Responsibilities include assisting with coordination of plan review and comments, updating and preparing addendum for bid purposes, logging bidder questions and architect responses, and other management tasks as needed.
Manhattan Beach Pier Railing Replacement (Project No. D-929), City of Manhattan Beach (Manhattan Beach, CA) - Inspector for this project that included the replacement of railing along the Manhattan Beach Pier as well as partially along a segment of an existing bicycle trail and lower parking lot; repairs to concrete and concrete curbs on and adjacent to the rails; and replacement of two existing wooden stairs that provide beach access. All work performed preserves the Pier's historic look.
Ceramic Studios Kiln Installation (Project No. D-937), City of Manhattan Beach (Manhattan Beach, CA) - Alternate Inspector for this project that included the installation of a new kiln at the existing Ceramic Studios Building, construction of a new shade structure (including new concrete footings) with equipment pad for ceramics kiln, and relevant mechanical, electrical and plumbing (gas) connections.
Manhattan Beach Blvd. Resurfacing Project (Aviation Blvd. to Inglewood Ave.), City of Redondo Beach (Redondo Beach, CA) - Alternate Inspector for this project that included improvements to sidewalk, median, ADA ramp, and driveway concrete work, pavement grind and overlay, landscaping, and signing/ striping.
Manhattan Village Senior Villas ADA Pathway Project (Project No. T-250), City of Manhattan Beach (Manhattan Beach, CA) - Inspector for this ADA pathway project to replace missing sidewalk and provide senior residents safe and dedicated access from their community to the public sidewalk and Metro bus stop on Parkview Avenue. The project included the path of travel from the public right-of-way to the Manhattan Village Senior Villas and soccer field restroom; new ADA switchback ramp and stairs; new pedestrian marked pathway; ADA-compliant parking, striping and signage; and modified parking lot landscaping.
Carson Street Beautification Project (Norwalk Blvd. to Bloomfield Ave.), City of Hawaiian Gardens (Hawaiian Gardens, CA) - Alternate Inspector for this project that included sidewalk, median, ADA ramp, and driveway concrete work, pavement grind and overlay, landscaping, street lighting and signing/ striping.
Responsibilities include managing construction activities, performing project coordination with the City and surrounding businesses, responding to RFls, reviewing submittals, processing change orders, tracking construction quantities, reviewing monthly progress payments, coordinating project changes requested by residents and approved by the City, managing construction schedules, providing public outreach to coordinate work impacting nearby residents and businesses, and responding to claims. 1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com Cherry Cove Park Playground Improvements Project
City of Lakewood
December02, 2024
1960 E . Grand Avenue, Suite 300 | El Segundo, CA 90245 | 310 .359 .1203 | www.ardurra.com Wireless Permit Technician Engineer,Rancho Palos Verdes, CA – Joseph received small cell wireless applications, reviewed submittals and plans for FCC and City regulation compliance, prepared and dispatched correction memoranda for submittals, conducted field review and verification of cell site installations, and isue permits for cell site maintenance and installations in the public right -of-way.
Assistant Traffic Engineer,Compton, CA* – Joseph investigated citizen requests and monitored traffic counts, speed surveys, plan revisions, stop sign warrant analysis, speed calming assessments, speed hump eligibility policy, and field data collection. He designed detour plans, site plans, and work orders.
Field Engineer, Laguna Beach, CA* – Joseph conducted a traffic safety assessment field review, which included evaluation for ADA-compliant facilities, assessment of intersection visibility, site exhibits for roadway geometrics, and traffic control devices.
Assistant Traffic Engineer, Eastvale, CA* – Joseph created site plans and work orders for advance street name signs, performed stop warrant analysis, conducted field review, data collection, and assisted in updating the engineering and traffic survey.
Public Works Inspector,Pomona, CA* – Joseph performed construction inspection services for private infrastructure. Inspections included demolition, removal of hazardous materials, grading and excavation, storm drain, sewer pipe and structures for placement and shading, curb and gutter, sidew alk and pedestrian ramps, and asphalt for placement and temperatures.
Fuel Modification Supervisor,Rancho Palos Verdes, CA* – Joseph conducted project coordination for the citywide clearing of vegetation and non-native brush within the City’s open space properties. He organized pre-construction meetings, monitored and observed multiple contract services, coordinated with outside agencies involved in nature preserves, evaluated invoices, maintained project files, and submitted daily reports.
Assistant Traffic Engineer,Oxnard, CA* – Joseph prepared work orders for installing and removing traffic control devices, responded to client inquiries related to traffic operations, and conducted temporary traffic control plan check and comments per CA MUTCD. He monitored traffic counts, speed surveys, plan revisions, stop sign warrant analysis, and field work.
Plan Check Engineer, Maywood, Costa Mesa, and Seal Beach, CA* – Joseph provided temporary traffic control plan check and comment per CA MUTCD.
Field Engineer, Maywood, CA* – Joseph used ArcGIS to do citywide sign surveys (field data collection).
Field Engineer, South Pasadena, CA* – Joseph conducted stop sign warrant analysis (field data collection and analysis).
Field Engineer, Palm Desert, CA* – Joseph monitored the intersection and stop sign warrant analysis. * Work performed prior to Ardurra
Cherry Cove Park Playground Improvements Proiect
City of Lakewood
December 02, 2024
Wireless Permit Technician Engineer, Rancho Polos Verdes, CA - Joseph received small cell wireless applications, reviewed submittals and plans for FCC and City regulation compliance, prepared and dispatched correction memoranda for submittals, conducted field review and verification of cell site installations, and issue permits for cell site maintenance and installations in the public right-of-way.
Assistant T roffic Engineer, Compton, CA* - Joseph investigated citizen requests and monitored traffic counts, speed surveys, plan revisions, stop sign warrant analysis, speed calming assessments, speed hump eligibility policy, and field data collection. He designed detour plans, site plans, and work orders.
Field Engineer, Laguna Beach, CA* - Joseph conducted a traffic safety assessment field review, which included evaluation for ADA-compliant facilities, assessment of intersection visibility, site exhibits for roadway geometrics, and traffic control devices.
Assistant Traffic Engineer, Eastvale, CA* - Joseph created site plans and work orders for advance street name signs, performed stop warrant analysis, conducted field review, data collection, and assisted in updating the engineering and traffic survey.
Public Works Inspector, Pomona, CA* - Joseph performed construction inspection services for private infrastructure. Inspections included demolition, removal of hazardous materials, grading and excavation, storm drain, sewer pipe and structures for placement and shading, curb and gutter, sidewalk and pedestrian ramps, and asphalt for placement and temperatures.
Fuel Modification Supervisor, Rancho Palos Verdes, CA* - Joseph conducted project coordination for the citywide clearing of vegetation and non-native brush within the City's open space properties. He organized pre-construction meetings, monitored and observed multiple contract services, coordinated with outside agencies involved in nature preserves, evaluated invoices, maintained project files, and submitted daily reports.
Assistant Traffic Engineer, Oxnard, CA* - Joseph prepared work orders for installing and removing traffic control devices, responded to client inquiries related to traffic operations, and conducted temporary traffic control plan check and comments per CA MUTCD. He monitored traffic counts, speed surveys, plan revisions, stop sign warrant analysis, and field work.
Plan Check Engineer, Maywood, Costa Mesa, and Seal Beach, CA* - Joseph provided temporary traffic control plan check and comment per CA MUTCD.
Field Engineer, Maywood, CA* - Joseph used ArcGIS to do citywide sign surveys (field data collection).
Field Engineer, South Pasadena, CA* - Joseph conducted slop sign warrant analysis (field data collectio n and analysis).
Field Engineer, Palm Desert, CA* - Joseph monitored the intersection and stop sign warrant analysis. * Work performed prior to Ardurra
1960 E. Grand Avenue, Suite 300 I El Segundo, CA 90245 I 310.359. 1203 I www.ardurra.com ------ -----
CITY OF LAKEWOOD SUCCESSOR AGENCY - HOUSING
FUND SUMMARY 11/20/2025
In accordance with section 2521 of the Lakewood Municipal Code, presented herewith is a summary of obligations to be paid by the City of Lakewood. Each of the following demands has been audited by the Director of Finance and Administrative Services and approved by the City Manager. 3901 HOUSING SUCCESSOR AGENCY 41,385.00
41,385.00
Council Approval
Date City Manager
Attest
City Clerk Director of Finance and Administrative Services LHSA-1
CHECK/EFT
DATE
11/20/2025
CITY OF LAKEWOOD SUCCESSOR AGENCY - HOUSING
SUMMARY CHECK/EFT REGISTER
VENDOR NAME
THE SALVATION ARMY
Totals:
CHECK/EFT
AMOUNT
41,385.00
41,385.00
Page I of I