Cities Index.
Agenda packet

Lancaster City Council
August 9, 2022

Document
Agenda packet
Meeting
August 9, 2022
Body
Lancaster City Council
Pages
32
Original file
21.2 MB
Text extracted from the city's file for reading and search. Open the original on cityoflancasterca.primegov.com. That file is the official record.

Tuesday, August 9, 2022
Regular Meeting –
5:00 p.m.

The City Clerk/Agency/Authority Secretary hereby declares the agenda was posted by 5:00 p.m. on
August 5
, 2022
at the entrance to the Lancaster City Hall Council Chambers 44933 Fern Avenue, Lancaster, CA 93534

LEGISLATIVE BODY
City Council/Successor Agency/Financing/Power/California Choice Energy Authority Mayor/Chair R. Rex Parris
Vice Mayor/Vice Chair Marvin Crist
Council Member/Agency Director/Authority Darrell Dorris Council Member/Agency Director/Authority Member Raj Malhi Council Member/Agency Director/Authority Member Ken Mann

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

EMERGENCY DECLARATION

AGENDA ITEMS TO BE REMOVED
Sometimes

it

is

necessary

to

remove

items

from

the

agenda.

We

apologize

for

any

inconvenience

this
may cause you.

PUBLIC BUSINESS FROM THE FLOOR - AGENDIZED
ITEMS
Any

person

who

would

like

to

address

the

Legislative

Bodies

on

any

agendized

item

is

requested
to

complete

a

speaker

card

for

the

City

Clerk/Agency/Authority

Secretary

and

identify

the

agenda
item

you

would

like

to

discuss.

Each

person

will

be

given

an

opportunity

to

address

the

Legislative
Body

at

the

time

such

item

is

discussed.

Speaker

cards

are

available

at

the

rear

of

the

Council
Chambers

and

your

speaker

card

must

be

filled

out

prior

to

the

agenda

item

being

called.

We
respectfully

request

that

you

fill

the

cards

out

completely

and

print

as

clearly

as

possible.

Following
this

procedure

will

allow

for

a

smooth

and

timely

process

for

the

meeting

and

we

appreciate

your
cooperation.

Individual speakers are limited to three (3) minutes each.

Consent

Calendar

items

under

the

Legislative

Body

may

be

acted

upon

with

one

motion,

a

second

and
the

vote.

If

you

desire

to

speak

on

an

item

or

items

on

the

Consent

Calendar,

you

may

fill

out

one
speaker

card

for

the

Consent

Calendar.

You

will

be

given

three

minutes,

unless

a

different

time

limit

is
announced,

to

address

your

concerns

before

the

Legislative

Body

takes

action

on

the

Consent
Calendar.

CALL TO ORDER
City Council/Successor Agency/Financing/Power/California Choice Energy Authority

ROLL CALL
City Council Members /Agency Directors /Authority Members: Dorris, Malhi, Mann; Vice Mayor/ Vice Chair Crist, Mayor/Chair Parris

INVOCATION
Brad Hayen, Grace Chapel

PLEDGE OF ALLEGIANCE

PRESENTATION

1. University of Antelope Valley Scholarship Program
Presenter: Sandra Johnson

ED 1.

COVID-19 Pandemic Updates and Actions

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

COUNCIL ACTIONS

CONSENT CALENDAR

Recommendation:

1. Receive update from staff and/or deputy mayors regarding COVID-19 pandemic status.

2. Direct staff to take actions in response to updated COVID-19 information.

3. Authorize

the

City

Manager

to

take

actions,

execute

documents

and/or

expend

funds

in
response to the COVID-19 pandemic.

4. Authorize

and/or

direct

the

City

Attorney,

with

the

concurrence

of

the

City

Manager,

to
take

actions,

execute

documents

and

expend

funds

in

response

to

legal

issues

pertaining

to
the COVID-19 pandemic.

ED 2.

Resolution Confirming the Continued Existence of a Local Emergency

Recommendation:

Adopt

Resolution

No.

22-47

,

a

resolution

of

the

City

Council

of

the

City

of

Lancaster,
California,

confirming

the

continued

existence

of

a

local

emergency

in

the

City

of

Lancaster,
California
The

number

of

COVID-19

cases

in

Los

Angeles

County

has

once

again

surged

with

the
appearance

of

the

Omicron

variant

and

its

more

contagious

subvariants.

As

a

result,

the

local
public

health

emergency

caused

by

the

COVID-19

pandemic

remains

in

effect,

and

the

virus
and

its

variants

continue

to

pose

a

threat

to

the

health

and

safety

of

residents

in

the

City

of
Lancaster.

CC 1.

Waive

further

reading

of

any

proposed

ordinances.

(This

permits

reading

the

title

only

in

lieu
of reciting the entire text.)

CC 2.

Approve

the

City

Council/Successor

Agency/Housing/Financing/Power/California

Choice
Energy Authority Regular Meeting Minutes of July 26, 2022.

CC 3.

Check Registers – June 26, 2022, through July 16, 2022

Recommendation:

Approve

the

Check

and

Wire

Registers

for

June

26,

2022,

through

July

16,

2022,

in

the
amount of $6,535,011.67 as presented.

At

each

regular

City

Council

Meeting,

the

City

Council

is

presented

with

a

check

and
ACH/wire

registers

listing

the

financial

claims

(invoices)

against

the

City

for

the

purchase

of
materials,

supplies,

services,

and

capital

projects

issued

the

prior

three

to

four

weeks.

This
process

provides

the

City

Council

the

opportunity

to

review

the

expenditures

of

the

City.

Claims

are

paid

via

checks,

Automated

Clearing

House

(ACH)

payments,

or

federal

wires.

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

The

justifying

backup

information

for

each

expenditure

is

available

in

the

Finance
Department.

CC 4.

Monthly Report of Investments – June 2022

Recommendation:

Accept and approve the June 2022 Monthly Report of Investments as submitted.

Each

month,

the

Finance

Department

prepares

a

report

listing

the

investments

for

all

separate
entities

under

the

jurisdiction

of

the

City

as

identified

in

the

City’s

Comprehensive

Annual
Financial Report.

CC 5.

Lancaster National Soccer Center Emergency Well Pump Replacement

Recommendation:

1. Per

the

Public

Contract

Code

22035

&

22050

Emergency

Contracting

Procedures,

accept
update on the Lancaster National Soccer Center Emergency Well Pump Replacement.

Upon

council

action,

staff

issued

a

Notice

to

Proceed

to

Legend

Pump

&

Well

Service

on
May

25,

2022.

The

purchase

requisition

was

submitted

on

May

26,

2022.

Equipment

and
materials

were

received

and

the

well

rehab

work

commenced

on

June

20,

2022.

Installation
of

the

new

equipment

began

the

week

of

July

5,

2022.

The

major

repairs

are

complete

and
watering

of

the

field

has

fully

resumed.

The

vendor

is

awaiting

receipt

of

a

check

valve

and
gate valve equipment for installation, which will complete the repair project.

CC 6.

Amend

Operating

Agreement

for

the

Management

of

Zelda’s

750

West

and

Lancaster
Performing Arts Center East End Concessions

Recommendation:

1. Approve

Amendment

to

the

Agreement

for

the

Management

of

Zelda’s

750

West

and
Lancaster

Performing

Arts

Center

East

End

Concessions

to

decrease

insurance
coverage requirement.

2. Authorize City Manager or designee to execute contract amendment.

On

December

14,

2021

City

Council

awarded

the

operating

agreement

for

the

management
of

Zelda’s

750

West

and

Lancaster

Performing

Arts

Center

East

End

Concessions

through
Solicitation

for

Offers

744-22O

to

Fusion

Food

Concepts

(Operator).

The

agreement

requires
the

operator

to

carry

umbrella

or

excess

liability

coverage

with

a

limit

of

not

less

than

Ten
Million

Dollars

($10,000,000).

The

operator

has

met

this

obligation.

However,

due

to

the

cost
of

the

insurance

policy,

the

vendor

is

requesting

to

amend

the

contract

to

require

umbrella

or
excess

liability

coverage

with

a

limit

of

not

less

than

Five

Million

Dollars

($5,000,000).

The
vendor

has

been

successfully

operating

since

January

1,

2022

with

no

issues

or

concerns,
therefore staff recommends the request to reduce the insurance requirement be approved.

CC 7.

Approve

Amendment

No.

1 and

No.

2 for

RFP

No.

710-19

Landscape

Maintenance

Services
Agreement with Terracare, Inc (PARKS)

Recommendation:

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

a.

Approve Amendment No. 1 for RFP No. 710-19 Landscape Maintenance Services Agreement with Terracare, Inc which increased the NTE (not to exceed) amount from $435,193 to $551,387.52.

b.

Approve Amendment No. 2 for RFP No. 710-19 with Terracare Associates, of Littleton, CO, a one-year extension for professional landscape maintenance services, for an estimated amount not to exceed $569,869.
c.

Authorize the City Manager, or his designee, to sign all documents.

In

July

2019,

Terracare

Associates

was

awarded

the

contract

for

Parks

Maintenance

Services
through

Request

for

Proposal

No.

710-19.

Terracare

Associates

began

to

service

this

contract
effective

September

1,

2019

through

their

Lancaster-based

facility,

which

employs

20 Lancaster

residents.

Services

covered

under

this

agreement

include,

but

are

not

limited

to,
mowing,

edging,

aerating,

pruning,

fertilizing,

weed

abatement

and

pest

control

to

provide
maintenance

of

landscaping

for

all

City

parks,

the

Lancaster

Municipal

Stadium,

the
Lancaster

National

Soccer

Center,

and

other

Facilities

across

the

City.

This

amendment

will
extend

the

contract

by

one

(1)

year,

effective

September

1,

2022,

as

well

as

add

a

number

of
facilities

to

the

landscape

services

contract.

These

additional

facilities

include

City-owned
Community Homes, Boeing Plaza, Community Center, and the Lancaster University Center.

CC 8.

Approval

of

Amendment

No.

1 for

RFP

No.

705-19

Landscape

Maintenance

Services
Agreement with Terracare, Inc.

Recommendation:

1. Approve

Amendment

No.

1 for

RFP

No.

705-19

Landscape

Maintenance

Services
Agreement

with

Terracare,

Inc.,

which

increases

the

not-to-exceed

contract

amount

from
$863,852.00 to $951,565.85 with a 10% contingency for additional work as needed.

2. Authorize the City Manager, or his designee, to sign all documents.

A

request

for

proposal

was

issued

and

on

April

17,

2019

bids

were

received

from

five

(5)
firms

and

four

(4)

were

determined

to

be

complete

and

qualified.

A

committee

comprised

of
staff

from

Finance,

Development

Services

and

Parks,

Recreation

and

Arts

received

the

bid
submittals.

Based

on

evaluation

measures

identified

in

the

Request

for

Proposal

(RFP),

which
included:

pricing,

experience

performing

services

of

similar

size

and

scope,

qualifications

of
staff,

references,

and

local

preference,

Terracare

was

determined

to

be

the

contractor

who
could

provide

the

best

product

for

the

best

prices.

Terracare

currently

has

several

offices

in
southern

California

and

will

use

this

opportunity

to

expand

into

the

Antelope

Valley.

In
addition,

they

plan

to

open

a

small

office

in

Lancaster

and

hire

local

residents

to

fulfill

this
contract.

CC 9.

Approval of the Cayenta annual maintenance invoice for FY 23

Recommendation:

Approve payment of the Cayenta annual maintenance invoice for fiscal year 2023.

Cayenta,

a

division

of

Harris

Computer

Systems,

is

an

integrated

suite

of

financial

software
applications

for

local

government.

The

City

has

been

using

Cayenta

for

its

financial

software
since

1987

and

relies

on

Harris

Computer

Systems

for

support

and

maintenance.

This

allows

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

staff

to

have

access

to

vendor

resources

for

support

if

the

need

arises

as

well

as

providing

the
city with patches and updates to the system as needed.

CC 10.

Approval of the Infinity Technologies Consulting Services Agreement

Recommendation:

Approve payment of the Infinity Technologies Consulting Services Agreement for FY23.

The

proposed

Consulting

Services

Agreement

with

Infinity

Technologies

will

allow

the

City
to continue to expand on and improve the GIS usage across the City.

CC 11.

Approval of the Nutanix three-year support and licensing agreement

Recommendation:

Approve

payment

of

the

Nutanix

three-year

support

and

licensing

agreement

for

FY23,
FY24, and FY25
The

proposed

support

and

licensing

agreement

provides

the

City

with

hardware

and

software
support

to

ensure

the

City’s

data

center

hardware

and

applications

are

available

and
operational

with

limited

interruptions.

The

three-year

agreement

allows

the

City

to

save
$53,941 dollars over three one-year agreements.

CC 12.

Approve

agreement

between

the

Antelope

Valley

Air

Quality

Management

District

and

the
City of Lancaster

Recommendation:

Approve

a

5-year

staffing

agreement

between

the

Antelope

Valley

Air

Quality

Management
District ( A VAQMD) and the City of Lancaster (CITY).

A VAQMD

is

the

local

agency

with

the

primary

responsibility

for

the

control

of

air

pollution
from

all

sources

in

the

region.

Currently,

A VAQMD

contracts

with

Mojave

Desert

Air
Quality

Management

District

(MDAQMD)

for

staffing

and

support

services.

MDAQMD

is
based

in

San

Bernardino

County

and

are

subject

to

the

labor

costs

and

rates

of

the

County

of
San

Bernardino.

It

was

a

suggestion

of

the

A VAQMD

board

to

look

for

options

to

reduce
costs and to find a staffing solution more local to the Antelope Valley.

CC 13.

Adoption

of

an

Ordinance

to

Establish

Speed

Limits

on

135

Roadway

Segments

and

Amend
Section 10.04.020 of the Lancaster Municipal Code

Recommendation:

Adopt

Ordinance

No.

1091,

establishing

speed

limits

on

135

roadway

segments

in

the

City
of Lancaster, and amending Section 10.04.020 of the Lancaster Municipal Code (LMC).

The

proposed

ordinance

is

to

adopt

speed

limits

on

the

selected

135

roadway

segments

in

the
City

of

Lancaster,

as

determined

by

the

attached

2022

Spot

Speed

Survey

and

Analysis
(Study).

The

Study

was

performed

in

accordance

with

the

provisions

of

the

California
Vehicle

Code

(CVC)

Section

627

and

Assembly

Bill

(AB

43),

and

as

recommended

by

the

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

COUNCIL REPORTS
California

Department

of

Transportation

Manual

on

Uniform

Traffic

Control

Devices

(CA-
MUTCD).

Sections

22357

and

22358

of

the

CVC

require

that

certain

local

speed

limits

be
determined

based

upon

the

Engineering

and

Traffic

Survey

(E&TS)

reports,

and

that

these
speed limits are established by local ordinance.

CR1.

Council Reports

CALIFORNIA CHOICE ENERGY AUTHORITY

No action required at this time.

LANCASTER HOUSING AUTHORITY

No action required at this time.

LANCASTER FINANCING AUTHORITY

No action required at this time.

LANCASTER POWER AUTHORITY

No action required at this time.

LANCASTER SUCCESSOR AGENCY

No action required at this time.

CITY MANAGER / EXECUTIVE DIRECTOR ANNOUNCEMENTS

CITY CLERK/AGENCY/AUTHORITY SECRETARY ANNOUNCEMENT

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

PUBLIC BUSINESS FROM THE FLOOR - NON-AGENDIZED ITEMS
This portion of the agenda allows an individual the opportunity to address the Legislative Bodies on any item

NOT ON THE AGENDA
regarding City/Agency/Authority business and speaker cards must be submitted
prior
to the beginning of this portion of the Agenda. Please complete a speaker card for the City Clerk/Agency/Authority Secretary and identify the subject you would like to address. We respectfully request that you fill the cards out completely and print as clearly as possible. Following this procedure will allow for a smooth and timely process for the meeting and we appreciate your cooperation. State law prohibits the Legislative Body from taking action on items not on the agenda and your matter may be referred to the City Manager/Executive Director.

Individual
Speakers are limited to three (3) minutes each unless a different time limit is announced.

CITY COUNCIL / AGENCY/ AUTHORITY COMMENTS

CLOSED SESSION

1. Conference with Legal Counsel - Anticipated Litigation: significant exposure to litigation pursuant to Government Code Section 54956.9(d) (2) - two potential cases.

2. Conference with Legal Counsel - Anticipated Litigation: consideration of initiation of litigation pursuant to Government Code Section 54956.9(d) (4) - two potential cases.

3. Antelope Valley Groundwater Cases Included Action:

Los Angeles County Waterworks District No. 40 v. Diamond Farming Co. Superior Court of California, County of Los Angeles, Case No. BC325201;
Los Angeles County Waterworks District No. 40 v. Diamond Farming Co. Superior Court of California, County of Kern, Case No. S-1500-CV-254-348; Wm. Bolthouse Farms, Inc. v. City of Lancaster, Diamond Farming Co. v. City of Lancaster, Diamond Farming Co. v. Palmdale Water District
Superior Court of California County of Riverside, consolidated actions; Case Nos.

RIC 353 840, RIC 344 436, RIC 344 668

4. Ramos v Patino, LASC Case No. MC027974

5. Rahier v. City of Lancaster, LASC Case No. 19 AVCV00163

6. Brisa Mahoney, et al. v. City of Lancaster, et al., LASC Case No. 2OSTCV02556

7. Manzo v. Beazer Homes Holdings, LLC et al., LASC Case No. 20 AVCV00297

8. Hernandez v. County of Los Angeles, et al., LASC Case No. 20 AVCV00318

9. Romines v. City of Lancaster, et al,, LASC Case No. 20 AVCV00345

10. Moujan v. City of Lancaster et al., LASC Case No. 20 AVCV00205

11. Davis v. State of California, LASC Case No. 19 AVCV00805

12. Lancaster v. Netflix, et al., LASC 21STCV01881

13. Butts v. Lancaster, LASC 21STCP00389

14. Lancaster v. Rives

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

15. Myesha Lopez, et al. v. County of Los Angeles, et al. CDCA Case No. 5:21-cv-00290- JGB(SHKx)

16. Ortiz v. Lancaster, LASC Case No. 21 AVCV00001

17. Aijala v. Lancaster, LASC Case No. 21STCV07841

18. Gardner v. Dominoids, LASC Case No. 21 AVCV00186

19. Evans v. Lancaster, LASC Case No. 21 AVCV00145

20. Bojorquez v. Lancaster, LASC Case No. 20 AVCV00894

21. Arkey v. Lancaster, LASC Case No.20 AVCV00816

22. Perez v. Lancaster, LASC Case No. 20 AVCV00589

23. Serrano v. Los Angeles County et al. LASC Case No. 21 AVCV00562

24. Jackson v. RE Schultz Construction et al. LASC Case No. 21 AVCV00863

ADJOURNMENT
Next Regular Meeting:

August 23, 2022 at 5:00 p.m.

MEETING ASSISTANCE INFORMATION
In

compliance

with

the

Americans

with

Disabilities

Act,

this

meeting

will

be

held

at

a

location
accessible

to

persons

with

disabilities;

if

you

need

special

assistance

to

participate

in

this

meeting,
please

contact

the

City

Clerk

at

(661)723-6020.

Services

such

as

American

Sign

Language
interpreters,

a

reader

during

the

meeting,

and/or

large

print

copies

of

the

agenda

are

available.

To
ensure

availability,

you

are

advised

to

make

your

request

at

least

72 hours

prior

to

the

meeting/event
you

wish

to

attend.

Due

to

difficulties

in

securing

sign

language

interpreters,

five

or

more

business
days

notice

is

strongly

recommended.

For

additional

information,

please

contact

the

City

Clerk

at
(661)723-6020.

AGENDA ADDENDUM INFORMATION
On

occasion

items

may

be

added

after

the

agenda

has

been

mailed

to

subscribers.

Copies

of

the
agenda

addendum

item

will

be

available

at

the

City

Clerk

Department

and

are

posted

with

the

agenda
on

the

windows

of

the

City

Council

Chambers.

For

more

information,

please

call

the

City

Clerk
Department at (661) 723-6020.

All documents available for public review are on file with the City Clerk Department.

CITY OF LANCASTER, CALIFORNIA
CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY ADJOURNED REGULAR MEETING AGENDA
TUESDA Y, 08/09/2022

STAFF REPORT
City of Lancaster
ED 2
8/9/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: Andrea Alexander, City Clerk
Subject: Resolution Confirming the Continued Existence of a Local Emergency Recommendation:

Adopt Resolution No. 22-47 , a resolution of the City Council of the City of Lancaster, California, confirming the continued existence of a local emergency in the City of Lancaster, California

Fiscal Impact:

Staff will return to Council with future revenue, expense, or cost reimbursement appropriations recommendations.

Background:

On January 30, 2020, the International Health Regulations Emergency Committee of the World Health Organization (“WHO”) declared the COVID-19 outbreak a public health emergency of international concern, and subsequently characterized COVID-19 as a pandemic. The United States Health and Human Services Secretary declared a public health emergency related to the COVID-19 outbreak on January 31, 2020. On March 4, 2020, the Governor of California declared a state of emergency related to the COVID-19 outbreak. The Los Angeles County Board of Supervisors and the Los Angeles County Department of Public Health declared a local and public health emergency related to the COVID-19 outbreak on March 4, 2020. The President of the United States declared a national emergency resulting from the COVID-19 outbreak on March 13, 2020.

On March 17, 2020, the City Council affirmed and ratified a Proclamation of the existence of a local emergency resulting from the COVID-19 pandemic.

The State and Los Angeles County Health Officers issued orders intended to help prevent the spread of COVID-19, including mandating people to stay home except as needed to perform essential services, ordering businesses deemed non-essential to close, and requiring the wearing of face masks. Since the original proclamation, the City Council has regularly reaffirmed the 1 0
0 5
continued existence of a local emergency, in accordance with the California Emergency Services Act (the “Act,” set forth at Cal. Gov’t. Code §§8550-8668).

The number of COVID-19 cases in Los Angeles County has once again surged with the appearance of the Omicron variant and its more contagious subvariants. As a result, the local public health emergency caused by the COVID-19 pandemic remains in effect, and the virus and its variants continue to pose a threat to the health and safety of residents in the City of Lancaster.

Staff recommends that City Council adopt Resolution No. 22-47, to again confirm the continued existence of the local emergency, as required by the Act (the “Act,” set forth at Cal. Gov’t. Code §§8550-8668), and, in accordance with the Act, to regularly review the need for continuing the local emergency.

Attachment:

Resolution No. 22-47
RESOLUTION NO. 22-47

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

LANCASTER, CALIFORNIA, CONFIRMING THE

CONTINUED EXISTENCE OF A LOCAL EMERGENCY IN

THE CITY OF LANCASTER, CALIFORNIA
WHEREAS, the California Emergency Services Act (Cal. Gov’t. Code §§8550-8668) requires the governing body of a city to review the need for continuing a local emergency that has previously been declared; and
WHEREAS, on March 17, 2020, the Lancaster City Council ratified a proclamation declaring the existence of a local emergency resulting from the COVID-19 pandemic; and WHEREAS, since the original proclamation, the City Council has regularly reaffirmed the continued existence of a local emergency, in accordance with the California Emergency Services Act (the “Act,” set forth at Cal. Gov’t. Code §§8550-8668); and WHEREAS, the national and local public health emergency resulting from the COVID-19 pandemic remains in effect; and
WHEREAS, until such time as the virus and its variants no longer pose a threat to the health and safety of residents in the City of Lancaster.

NOW, THEREFORE, BE IT RESOLVED AND ORDERED BY THE CITY COUNCIL OF THE CITY OF LANCASTER, STATE OF CALIFORNIA, THAT:

Section 1. The City Council of the City of Lancaster, California hereby finds and declares that the local emergency continues to exist, and shall be deemed to continue to exist until its termination is proclaimed by the City Council of the City of Lancaster, California.

PASSED, APPROVED AND ADOPTED this 9th day of August , 2022 by the following vote:

AYES: Council Members:

NOES:

ABSTAIN:

ABSENT:

Resolution No. 22-47

Page 2 ends

ATTEST: APPROVED:
______________________________ _________________________ ANDREA ALEXANDER R. REX PARRIS
City Clerk Mayor
City of Lancaster City of Lancaster
Resolution No. 22-47

Page 3 ends

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF LANCASTER )

CERTIFICATION OF RESOLUTION

CITY COUNCIL
I, ___________________________, __________________________, City of Lancaster, CA. do hereby certify that this is a true and correct copy of the original Resolution No. 22-47, for which the original is on file in my office.

WITNESS MY HAND AND THE SEAL OF THE CITY OF LANCASTER, on this _______, day of ___________________________, __________.
(seal)
_______________________________________

Tuesday, July 26, 2022

CALL TO ORDER
Vice Mayor/Vice Chair Crist called the meeting of the Lancaster City Council/Successor Agency/Financing/ Power/California Choice Energy Authority to order at 5:03 p.m.

ROLL CALL
PRESENT: City Council Members /Agenc y Directors /Authority Members: M alhi, Mann; Vice Mayor/Vice Chair Crist

ABSENT: Council Member/Agency Director/Authority Member Dorris; Mayor/Chair Parris

On a motion by Council Member Mann and seconded by Council Member Malhi the City Council/Successor Agency/Financing/ Power/California Choice Energy Authority excus ed Council Member/Agency Director/Authority Member Dorris; Mayor/Chair Parris , by the following vote: 3-0-0-2; AYES: Malhi, Mann, Crist; NOES: None; ABSTAIN: None; ABSENT:

Dorris, Parris

STAFF MEMBERS:

City Manager/Executive Director; Assistant City Mana ger/Deputy Executive Director; City Attorney/Agency/Authority Counsel; Assistant City Clerk/Agency/Authority Secretary; Assistant to the City Manager, Finance and Technology Director; Parks, Recreation and Arts Director; Public Safety Director; Community Development Senior Manager

INVOCATION
Waived

PLEDGE OF ALLEGIANCE
Larry Grooms

CC 2

08/09/22

JC

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

2 CONSENT CALENDAR
On a motion by Council Member Mann and seconded by Council Member Malhi the City Council approved the Consent Calendar , by the following vote: 3- 0-0-2; AYES: Malhi, Mann, Crist; NOES: None; ABSTAIN: None; ABSENT: Dorris, Parris

CC 1. ORDINANCE WAIVER
Waived further reading of any proposed ordinances. (This permits reading the title only in lieu of reciting the entire text.)

CC 2. MEETING MINUTES
Approved the City Council/Successor Agency/Housing/Financing/Power/California Choice Energy Authority Regular Meeting Minutes of June 28, 2022.

CC 3. CHECK REGISTERS
Approved the Check and Wire Registers for June 12, 2022 through June 25, 2022, in the amount of $5,269,913.14 as presented.

CC 4. FINAL MAP APPROVAL – PARCEL MAP NO. 83360 (LOCATED AT THE NORTHEAST CORNER OF 7
TH STREET EAST AND AVENUE K-8)
Approved Parcel Map No. 83360, located at northeast corner of 7th Street East and Avenue K-8; made findings that this project will not violate any of the provisions of Sections 66473.5, 66474.1 and 66474.6 of the Subdivision Map Act; and instructed the City Clerk to endorse on the face of the map the certificate which embodies the approval of said map.

CC 5. SEWER ACCEPTANCE AGREEMENT BETWEEN THE CITY OF LANCASTER

AND THE CITY OF PALMDALE
Authorized the City Manager, or his designee, to enter into a sewer acceptance agreement between the City of Lancaster and the City of Palmdale for the acceptance and conveyance of sewage from developments located within Palmdale jurisdictional boundaries in substantially the form attached hereto, with such changes as the City Manager and City Attorney deem appropriate.

CC 6. AGREEMENT AMENDMENT NO. 1 FOR RFP NO. 741-21 - HAND WORK AND

PROTECTED BIKE LANE SWEEPING SERVICES
Approved first amendment on agreement with SCA of CA, LLC., for RFP No. 741- 21 - Hand Work and Protected Bike Lane Sweeping Services, and authorized the City Manager, or his designee, to sign all documents.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

3 CC 7. PURCHASE AND INSTALLATION OF INCUBATOR CAMERA & DOOR

ACCESS CONTROL PANELS
Approved the following: the purchase and installation of cameras for the Lancaster Incubator. There will be 17 Cameras, 12 Security Door Access Control Panels, 1 Node and one Equipment Rack purchased for a cost of $244,710.00 which includes access to an application to view the cameras and the camera footage which will be stored in the cloud. This is the first part of a multi-part program to update City security.

CC 8. LANCASTER NATIONAL SOCCER CENTER EMERGENCY WELL PUMP

REPLACEMENT
Per the Public Contract Code 22035 & 22050 Emergency Contracting Procedures, accepted update on Lancaster National Soccer Center Emergency Well Pump Replacement.

CC 9. EXCHANGE AGREEMENT AND ASSIGNMENT OF FEDERAL HIGHWAY

INFRASTRUCTURE PROGRAM (HIP) FUNDS WITH LOS ANGELES COUNTY

METROPOLITAN TRANSPORT ATION AUTHORITY (LACMTA) LOCAL

TRANSPORTATION FUNDS , AND APPROPRIATION OF LACMTA

PROPOSITION C LOCAL RETURN FUNDS

1. Approved an Exchange Agreement and Assignment of Federal Highway Infrastructure Program (HIP) Funds with LACMTA Local Transportation Funds (LTF) in the amount of $754,676.00; and authorized the City Manager, or his designee, to sign all documents.

2. Recognized revenues and appropriate d expenditures totaling $1,600,000.00 in LACMTA Local Transportation Funds and Proposition C Local Return Funds to the Capital Improvement Program (CIP) project in the account numbers as shown below for the Sierra Highway Resurfacing from Avenue I to Lancaster Boulevard. · Revenue Account 321-3351-106; Expenditure Account 321-12ST051-924: $739,582.00 · Revenue Account 209-3315-100; Expenditure Account 209-12ST051-924: $860,418.00

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

4 PH 1. INTRODUCTION OF AN ORDINANCE TO ESTABLISH SPEED LIMITS ON 135 ROADWAY SEGMENTS AND AMEND SECTION 10.04 .020 OF THE

LANCASTER MUNICIPAL CODE
Vice Mayor Crist opened the Public Hearing.

The Community Development Senior Manager presented the staff report regarding this item.

The City Attorney stated one written public comment submitted by Mr. Rives, which was in front of the City Council, and on file with the City Clerk.

Vice Mayor Crist closed the Public Hearing.

On a motion by Council Member Mann and seconded by Council Member Malhi, the City Council Introduced Ordinance No. 1091, establishing speed limits on 135 roadway segments in the City of Lancaster, and amending Section 10.04.020 of the Lancaster Municipal Code (LMC) , by the following vote: 3 -0-0-2; AYES: Malhi, Mann, Crist; NOES: None; ABSTAIN: None; ABSENT: Dorris, Parris

Vice Mayor Crist announced to the public the different time limit of two minutes to be used for the procedure to address the City Council/Successor Agency/Authority regarding agendized items at tonight’s meeting due to the larger than normal amount of speaker cards received.

PH 2. APPROVAL TO INCREASE SOLID WASTE HANDLING SERVICES FEE FOR

SINGLE-FAMILY DWELLI NGS, AND COLLECTION OF SO LID WASTE

HANDLING SERVICES FE E FOR SINGLE- FAMILY DWELLINGS ON THE TAX ROLL PURSUANT TO SECTION 5473 OF THE HEALTH AND SAFETY CODE
Vice Mayor Crist opened the Public Hearing.

The City Manager presented the staff report regarding this item.

The City Attorney announced to the public that additional speaker cards were available at the back of the room so that anyone who was unable to grab one could do so now.

Addressing the City Council on this item:

Vice Mayor Crist called the first speaker Larry Grooms and requested the public speaker timer to not start.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

5 PH 2. APPROVAL TO INCREASE SOLID WASTE HANDLING SERVICES FEE FOR

SINGLE-FAMILY DWELLI NGS, AND COLLECTION OF SOLID WASTE

HANDLING SERVICES FE E FOR SINGLE- FAMILY DWELLINGS ON THE TAX ROLL PURSUANT TO SECTION 5473 OF THE HEALTH AND SAFETY CODE CONTINUED…
Vice Mayor Crist and Larry Grooms discussed a recent press conference, Mr. Grooms’ past employment with the State, misleadin g processes, effects of legislature, historical moments relating to government, assessment being applied to a property tax bill, tools given by the State, property tax laws, citizens obtaining funds for a public interest law firm to get the City to do the right thing vs. doing the political and corporate thing.

Larry Grooms – discussed the postcards sent, writers staffed by the City, City’s access to media outlets, difference between news and propaganda, need for the City to stand up and challenge the State of California, methane gas being removed from landfills going up to Bakersfield and turned into fuel for Waste Management’s trucks

Roberta Boil – discussed the trash fees going up, no advertisements, rate increases, disagreement with the City contractin g a private company like Waste Management, and unhappiness for the increase.

Louise Padilla – discussed speaking about this item before, rate information not computing, bill she received from Waste Management, Waste Management billing change from quarterly to every two months, lack of advertising, and being the only person on her street that received a postcard.

Anthony – discussed being a senior and his unhappiness with the trash bill being applied to a tax roll vs. continuing to pay his trash bill separately.

Kathy Ledgerwood – discussed not receiving a postcard, fee increase, questioned why the City was not doing it within the City and selling the methane gas, the increased rate being applied to the tax bill.

The City Manager discussed the fee increase and how the new fee would be applied and billed annually on the tax bill.

Kathy Ledgerwood – continued to discuss her disagreement with the way the fee was to be assessed on the tax bill.

Vice Mayor Crist discussed illegal dumping and property owner’ s not paying their trash bills.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

6 PH 2. APPROVAL TO INCREASE SOLID WASTE HANDLING SERVICES FEE FOR

SINGLE-FAMILY DWELLI NGS, AND COLLECTION OF SOLID WASTE

HANDLING SERVICES FE E FOR SINGLE- FAMILY DWELLINGS ON THE TAX ROLL PURSUANT TO SECTION 5473 OF THE HEALTH AND SAFETY CODE CONTINUED…
Vice Mayor Crist announced to the public the need to not speak out of order.

Vice Mayor Crist continued to discuss illegal dumping and property owner’s not paying their trash bills.

Kathy Ledgerwood – continued to discuss the increase, lawsuit relating to 5471, and new annual rate to be billed.

Vice Mayor Crist discussed contract negotiations with Waste Management and current citywide problems needing to be solved.

The City Manager discussed the fee increase and change to monthly billing.

Kathy Ledgerwood – continued to discuss the increase and number of citizens needed for majority vote protest.

Diane DeFilippo – discussed moving to Lancaster in 1972, contract for trash service, fees being charged, illegal dumping, dump hours, need for the increase to be on a ballot and voted.

Patrick S. – discussed his past employment and education, methods to reduce methane, vote being needed, and Proposition 218 Section 13 D.

Maureen P. – discussed the need for the fee increase to be voted upon in November, fee increase calculations not adding up, and the voting out of council members.

Robert M. – discussed the need to fight SB 1383.

Vice Mayor Crist discussed actions taken by the City over the past two years in protest of SB 1383, notice received of fines from the State to come for noncompliance, and other possibilities looked into.

Michael Russo – discussed the inaccuracy of the fee chart presented, statements made to justify the rate increase, imposed fines, and responsibility of cleanups.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

7 PH 2. APPROVAL TO INCREASE SOLID WASTE HANDLING SERVICES FEE FOR

SINGLE-FAMILY DWELLI NGS, AND COLLECTION OF SOLID WASTE

HANDLING SERVICES FE E FOR SINGLE- FAMILY DWELLINGS ON THE TAX ROLL PURSUANT TO SECTION 5473 OF THE HEALTH AND SAFETY CODE CONTINUED…
David Paul – discussed his love for public events, terms of council members, homeowners’ picking up the slack, measurables, fees being assessed to seniors, property taxes being burdened, and unfairness of the fees being charged.

Fran Sereseres – discussed the State putting the problem on the citizens, homeowners suffering, tax liens, concern for seniors, and rising costs.

Esther C. – discussed the monthly payment options vs. being charged annually, lack of increase to social security, and inflation.

Bill C. – discussed rate increases, rental properties, illegal dumping, impacts to seniors, need to help the people, and inflation.

Jason Snyder – discussed rate increases, lack of customer service by Waste M anagement, overall poor service provided by Waste Management, and increase in services.

Council Member Mann discussed contract negotiations with Waste Management including how the information being provided assists with the overall negotiations, need to remember the State’s involvemen t and how the Governor signed this into law, other assessments reflected on the tax bills that Council M embers assisted with decreasing, appreciation of all feedback provided, current and future impacts to restaurants, need for the trust of the Council Members, and inflation.

Fred Flores – discussed the increase in taxes for Waste Management, fixed income, cost of living, and taxes pushing people to move out of state.

Peggy L. – discussed how she received notice of this increase, unfairness of this incre ase, and potential for a lien on people’s homes,

Vice Mayor Crist discussed how fees would be imposed.

Peggy L. – continued to discuss her opposition to the fee, impacts to seniors, need to address landlords, and inflation.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

8 PH 2. APPROVAL TO INCREASE SOLID WASTE HANDLING SERVICES FEE FOR

SINGLE-FAMILY DWELLI NGS, AND COLLECTION OF SOLID WASTE

HANDLING SERVICES FE E FOR SINGLE- FAMILY DWELLINGS ON THE TAX ROLL PURSUANT TO SECTION 5473 OF THE HEALTH AND SAFETY CODE CONTINUED…
Larry L. – discussed the proposed fees and how they were to be billed, potential future increases, Proposition 13, and questioned if a vote was to be done.

The City Attorney announced to the public that if anyone had a written protest to submit that had not submitted it, to please do so before the close of this Public Hearing.

Kathy Raegan – discussed research she completed, and questioned if the increase was a tax, assessment, or a fee.

The City Attorney stated it was a charge under the Health & Safety Code 5473.

Kathy Raegan – continued to discuss postcards received and the vote required to prevent the fee from being added to the tax rolls.

The City Attorney stated it’s a majority protest process so if fifty percent plus one protests are submitted, then the Council cannot approve the item before them.

Kathy Raegan – continued to discuss postcards received, the vote required to prevent the fee from being added to the tax rolls, Vector assessment, questioned why a ballot wasn’t sent, and prior approval of information.

Terri S. – discussed his trash pickup and need for the City to negotiate with Waste Management.

The City Attorney announced to the public that if anyone had submitted a written protest at the last meeting we tried to have on the 12
th, that protest counts, was in the City’s
possession, and would be counted; otherwise, if anyone had not submitted a written protest, to please do so now, as there was paper available in the back of the room, and they would need to put their name, address, their protest, and sign their name.

James Warden – discussed the rate increase, elimination of discounts, increased revenue to Waste Management, extra bins, and disagreement with the assumed yes vote by protest.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

9 PH 2. APPROVAL TO INCREASE SOLID WASTE HANDLING SERVICES FEE FOR

SINGLE-FAMILY DWELLI NGS, AND COLLECTION OF SOLID WASTE

HANDLING SERVICES FE E FOR SINGLE- FAMILY DWELLINGS ON THE TAX ROLL PURSUANT TO SECTION 5473 OF THE HEALTH AND SAFETY CODE CONTINUED…
Robert W. – discussed tax breaks mentioned, annual increase percentage, mailers not being received by homeowners, and the need to not put the fees on the tax bill.

James Young – discussed the postcard that was mailed and questioned the actual mailing date, unfairness of the required majority protest, dislike of the for profit Waste Management, sneakiness behind the process, need to take care of the citizens, and the need to put this item on the ballot for vote.

Ward Blaze – discussed the mail dates of the mailers, vote taken in April, prorated bills, tax grab, and the need for people to do their homework.

Bonnie W. – discussed Waste Management contract negotiations, trash bin sizes, impacts to seniors, and discounts for seniors.

The City Attorney announced to the public the date of mailing was May 26 th.

Darlene Hays – discussed not being heard, people not knowing that the rates are going to be increased, need for the Mayor to attend the meetings, rules of the City needing to be enforced, use of eminent domain, her past service for this country, and the need to let the people vote.

Vice Mayor Crist asked the public if there was anyone else who would like to speak on this item.

Unidentified Speaker No. 1 – discussed billings, and questioned her recent billing amount and how it was going to be picked up on the tax bill.

The City Manager stated he was not aware of the speaker’s bill, but what would be on the tax bill roll, if you are a standard single family it would be $37.55 x 12, which would be on your tax bill and you would no longer receive a bill from Waste Management; if you are a senior it would be $29.19 x 12 and you would no longer receive a bill from Waste Management.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

10 PH 2. APPROVAL TO INCREASE SOLID WASTE HANDLING SERVICES FEE FOR

SINGLE-FAMILY DWELLINGS, A ND COLLECTION OF SOL ID WASTE

HANDLING SERVICES FE E FOR SINGLE- FAMILY DWELLINGS ON THE TAX ROLL PURSUANT TO SECTION 5473 OF THE HEALTH AND SAFETY CODE CONTINUED…
Unidentified Speaker No. 1 – continued to discuss her most recent bill received.

Unidentified Speaker No. 2 – questioned if the City could send a mailing to identify what the amount would be on their tax roll at the end of the year.

The City Manager stated instead of paying the fee quarterly you will be paying it twice a year on your tax bill.

Unidentified Speaker No. 3 – questioned the fees to be charged.

Unidentified Speaker No. 4 – discussed the Franchise Tax Board’s prior approval, requirements for meetings, fees not being paid which would allow for a lien to be placed on people’s properties.

Vice Mayor Crist stated this was one public meeting and that this item had not been approved yet, and requested the City Manager discuss what options had been looked into for seniors.

Vice Mayor Crist, the City M anager, and City Attorney discussed options looked into to soften the impact of the fee increase e.g., gift cards, rebates, opportunities from the non- profit perspective to clean up illegal dumping, etc. action to be taken, and prior direction to staff for the incorporation of ways to soften the impact of the fee increases.

The City Attorney announced to the public that everyone who wants to submit a written protest, to please do so now, as the Vice Mayor was about to be asked to close the Public Hearing at which point written protests would no longer be collected.

Unidentified Speaker No. 5 – questioned if the Vice Mayor had the count of people.

Unidentified Speaker No. 6 – discussed the Waste Management contract term and increases, and questioned how the City would handle future increases, and if they could do a clear vote vs. by mailings.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

11 PH 2. APPROVAL TO INCREASE SOLID WASTE HANDLING SERVICES FEE FOR

SINGLE-FAMILY DWELLI NGS, AND COLLECTION OF SOLID WASTE

HANDLING SERVICES FE E FOR SINGLE- FAMILY DWELLINGS ON THE TAX ROLL PURSUANT TO SECTION 5473 OF THE HEALTH AND SAFETY CODE CONTINUED…
Unidentified Speaker No. 7 – discussed the statements made about people not paying their trash bills, enforcement of codes.

Unidentified Speaker No. 8 – discussed the 5471 lawsuit.

Vice Mayor Crist closed the Public Hearing.

The City Attorney announced at this time it would be appropriate to allow the City Clerk to calculate the number of protests received and then return to this item.

The Assistant City Clerk provided the City Attorney with the total number of protests received.

The City Attorney announced the City has received 419 protests, which is less than fifty percent, so Council may move the item that is agendized for Resolution No. 22-45; it does require a two-thirds vote of the membership of the council, which would mean unanimous tonight.

Council Member Mann discussed changes and having more clarity moving forward.

On a motion by Council Member Mann and seconded by Council Member Malhi, the City Council Adopt ed Resolution No. 22- 45, approving (1) increase to solid waste handling services fee for single-family dwellings and (2) collection of solid waste handling services fee for single- family dwellings on the tax roll pursuant to section 5473 of the Health and Safety Code, by the following vote: 3- 0-0-2; AYES: Malhi, Mann, Crist; NOES: None; ABSTAIN: None; ABSENT: Dorris, Parris

Vice Mayor Crist recessed the meeting at 6:43 p.m.

Vice Mayor Crist reconvened the meeting at 6:50 p.m.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

12 CPH1. LANCASTER MAINTENANCE DISTRICT ANNEXATIONS (Continued) Vice Mayor Crist opened the Continued Public Hearing.

The City Attorney announced the results of the assessment ballot which were in favor of the annexation of territory into the Lancaster Maintenance Districts.

Vice Mayor Crist closed the Continued Public Hearing.

On a motion by Council Member Mann and se conded by Council Member Malhi, the City Council Continued the Public Hearing from June 28 th, and Adopted Resolution No. 22-39, announcing results of an assessment ballot procedure, ordering the annexation of territory into the Lancaster Maintenance Districts, and ordering the levy and collection of assessments therein, by the following vote: 3 -0-0-2; AYES: Malhi, Mann, Crist; NOES: None; ABSTAIN: None; ABSENT: Dorris, Parris

NB 1. CONDEMNATION PROCEEDINGS – PROPERTY ACQUISITION TRACT NO. 82831, LOCATED AT THE NORTHWEST CORNER OF TAHOE WAY AND NEWGROVE STREET (APN 3203-008-050)
The Capital Programs Manager presented this item.

Addressing the City Council on this item:

Unidentified Speaker No. 1 – discussed the process and how the property owner/s would have been contacted.

On a motion by Council Member Mann and seconded by Council Member Malhi, the City Council, 1. Conduc ted a hearing pursuant to Code of Civil Procedure section 1245.235, and 2. Adopted Resolution No. 22- 46, authorizing and directing the condemnation of certain real property located at the corner of Tahoe Way and Newgrove Street, identified as APN No. 3203- 008-050 (Portions Thereof) in the City of Lancaster, California, and declaring the public necessity therefor, by the following vote: 3- 0-0-2; AYES: Malhi, Mann, Crist; NOES: None; ABSTAIN: None; ABSENT: Dorris, Parris

CR 1. COUNCIL REPORTS

Vice Mayor Crist discussed AVTA updates including the purchase of new vans and the availability of vans for possible purchase by the City for ancillary things.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

13 CALIFORNIA CHOICE ENERGY AUTHORITY
No action required at this time.

LANCASTER HOUSING AUTHORITY
No action required at this time.

LANCASTER FINANCING AUTHORITY
No action required at this time.

LANCASTER POWER AUTHORITY
No action required at this time.

LANCASTER SUCCESSOR AGENCY
No action required at this time.

CITY MANAGER / EXECUTIVE DIRECTOR ANNOUNCEMENTS
The City Manager introduced and welcomed the new Public Safety Director, Rodrick Armalin to the team.

The Public Safety Director introduced himself and provided a brief overview of his background and experience, and stated they would be increasing their community engagement as hearing everyone’s voice was probably the most important piece of public safety.

The City Manager discussed the baby formula giveaways the City would be conducting, success of the PARCS Department’s Cool Summer Nights events, upcoming Softball State Championship coming to town, and road construction continuing to take place.

CITY CLERK /AGENCY/AUTHORITY SECRETARY ANNOUNCEMENT
The Assistant City Clerk provided the public with the procedure to address the City Council/Successor Agency/Authority regarding non-agendized items.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

14 PUBLIC BUSINESS FROM THE FLOOR - NON-AGENDIZED ITEMS Addressing the City Council at this time:

Heather – discussed information she previously provided that she needed to correct pertaining to the amount of water used to wash the dust and keep the dirt down at the 45,000-acre solar farms located towards the West on the boarder of Kern County and LA County.

Fran Sereseres – discussed a Chamber of Commerce event she attended where she received an award on behalf of the City of Lancaster for the Innovator of the Year Award for the 2021 to 2022 and then presented City Council with the award; and discussed her ap preciation for Council, and new committee she is on.

Arden Hughes – discussed hedgerows being left around the fields near to his home located near 40 th Street East and Avenue J-8, and requested assistance from the City to cleanup these hedgerows being left due to real hazard being posed.

Patrick Lawry – discussed the need to politicize issues with the Antelope Valley Hospital and the need to release the investigation on behalf of Tammie Lynn Gray who passed away at the hospital.

Sarah Odom – discussed being homeless and the desert cleanups that have been taking place.

Vice Mayor Crist asked the public if there was anyone else who would like to speak.

ADJOURNMENT
Vice Mayor/Vice Chair Crist adjourned the meeting at 7:30 p.m. and stated the next City Council/Successor Agency/Financing/Power/California Choice Energy Authority meeting will be held on Tuesday, August 9, 2022 at 5:00 p.m.

LANCASTER CITY COUNCIL/ SUCCESSOR AGENCY/

FINANCING/HOUSING/POWER/CALIFORNIA CHOICE ENERGY AUTHORITY

MINUTES
July 26, 2022

15 PASSED, APPROVED and ADOPTED this 9th day of August, 2022, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

ATTEST: APPROVED:

__________________________ _____________________________ ANDREA ALEXANDER R. REX PARRIS

CITY CLERK MAYOR/CHAIRMAN

STATE OF CALIFORNIA }
COUNTY OF LOS ANGELES }ss
CITY OF LANCASTER }

CERTIFICATION OF MINUTES

CITY COUNCIL/SUCCESSOR AGENCY/FINANCING/HOUSING/POWER/CALIFORNIA

CHOICE ENERGY AUTHORITY

I, ___________________________, ___________________________ of the City of Lancaster, CA, do hereby certify that this is a true and correct copy of the original City Council/Successor Agency/Financing/Housing/Power/California Choice Energy Authority Minutes, for which the original is on file in my office.

WITNESS MY HAND AND THE SEAL OF THE CITY OF LANCASTER, CA on this _______________ day of ______________________, ____________.

(seal)

______________________________________

STAFF REPORT
City of Lancaster
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: George N. Harris II, Finance Director
Subject:Check Registers – June 26, 2022, through July 16, 2022 Recommendation:

Approve the Check and Wire Registers for June 26, 2022, through July 16, 2022, in the amount of $6,535,011.67 as presented.

Fiscal Impact:
$6,535,011.67 as detailed in the Check Registers.

Background:

At each regular City Council Meeting, the City Council is presented with a check and ACH/wire registers listing the financial claims (invoices) against the City for the purchase of materials, supplies, services, and capital projects issued the prior three to four weeks. This process provides the City Council the opportunity to review the expenditures of the City.

Claims are paid via checks, Automated Clearing House (ACH) payments, or federal wires. The justifying backup information for each expenditure is available in the Finance Department.

Check Nos.: 7426860-7427196 $ 6,454,926.82
ACH/Wire Check Nos.: 101011037-101011040 $ 80,084.85 $ 6,535,011.67
Voided Check No.: N/A
Voided ACH/Wire No.: N/A

CC 3
08/09/22
JC
Staff Report
Monthly Report of Investments
September 26, 2006

Page 2 ends

GH:sp
Attachments:

Check Register
ACH/Wire Register
City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7426860 11062 RECYCLE AWAY,LLC CUSTOM STAMP/STACKABLE RECYCLR 42,742.38 330 4755779 42,742.38 7426861 D4333 BAKER, JAMES J JB-BOOTS/PANTS REIMBRS 405.67 203 4752220 405.67 7426862 C2060 CALIFORNIA WATER SERVICE 06/15/22 WATER SVC 2,348.52 482 4636654 2,348.52 7426863 09839 CARRILLO, NATHALIE NC-BB AIRPORT-LUGGAGE FEE 60.00 101 4220201 30.00 101 4220201 30.00

60.00 60.00
7426864 04987 FAIRCHILD, COLE CF-BOOT/PANT REIMBURSEMENT 340.18 101 4635209 340.18 7426865 C4447 GOODELL, VANCE VG-PR DM-ONTARIO-06/28-06/30 96.00 203 4754209 48.00 203 4754209 48.00

96.00 96.00
7426866 C5359 KIRK, BILLY JOE BK-PR DM-ONTARIO-06/30/22 48.00 203 4754209 48.00 7426867 1215 L A CO WATERWORKS 04/13/22-06/10/22 WATER SVC 38,570.45 101 4620654 55.60 101 4631654 413.74
101 4633654 1,043.48
101 4634654 10,262.25
203 4636654 13,445.49
482 4636654 13,349.89
38,570.45 38,570.45
7426868 D2287 LANCASTER CODE ENFRCMNT ASSN UNION DUES-PP 13/2022 150.00 101 2171000 150.00 7426869 11093 MONARCH TECHNOLOGIES INC MTA-FEE FOR CANNABIS SURCHAGE 30,000.00 101 4410301 30,000.00 7426870 10218 ORGANIC THERAPY COMPANY 06/22-COMMUNICABLE DISEASE CON 5,000.00 101 4431301 5,000.00 7426871 A7221 P E R S LONG TERM CARE PROGRAM LONG TERM CARE PREM-PP 13/2022 645.84 101 2170200 645.84 7426872 03154 SO CA EDISON 03/01/22-05/31/22 ELECTRIC SVC 624.71 483 4754660 624.71 7426873 03154 SO CA EDISON 04/14/22-06/15/22 ELECTRIC SVC 3,395.44 101 4620652 2,463.80 101 4633652 99.98
203 4636652 13.10
203 4754652 88.78
482 4636652 38.65
483 4754660 691.13
3,395.44 3,395.44
7426874 A1393 TEAMSTERS LOCAL 911 06/22 UNION DUES 3,435.00 101 2157000 3,435.00 7426875 D4317 WATKINS, MEG L MW-LUG FEE-BURBANK-6/4-8/22 60.00 101 4220201 30.00

Page 1 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 101 4220201 30.00

60.00 60.00
7426876 D3730 WHITE, GARRETT K GW-REIM-COLLEC SYTM MEM FEE 195.00 101 4220311 195.00 7426877 08979 A V PEST CONTROL JRP-PEST REMOVAL 110.00 101 4631301 110.00 EDP-PEST REMOVAL 65.00 101 4631301 65.00 PBP-PEST REMOVAL 95.00 101 4631301 95.00 AHP-PEST REMOVAL 85.00 101 4631301 85.00 355.00 355.00
7426878 06294 A V WEB DESIGNS NSC-06/22-MONTHLY HOSTING CHGS 99.95 112 4315302 99.95 7426879 07489 ACCESSO SHOWARE PAC-04/22-TICKET/DONATN SALES 1,610.85 112 4315302 1,610.85 7426880 10926 ACCURATE MEASUREMENT SYSTEMS KROHNE METER FOR BOOSTER STAT 3,000.00 485 4755294 3,000.00 7426881 D3147 AMERICAN PLUMBING SERVICES,INC OMP-URINAL REPAIR 963.56 101 4634402 963.56 LMS-BACKFLOW TESTING 269.00 101 4632402 269.00 1,232.56 1,232.56
7426882 09784 APCO INTERNATIONAL, INC. MK-APCO MEMBERSHIP DUES 940.00 101 4245230 940.00 7426883 C9805 ARROW TRANSIT MIX INC READY MIX CONCRETE 566.58 203 4752410 566.58 READY MIX CONCRETE 572.53 203 4752410 572.53 1,139.11 1,139.11
7426884 06738 ASPEN ENVIRONMENTAL GROUP 05/22-PROFESSIONAL SVCS 4,744.38 101 2185721 4,744.38 7426885 C9177 AVENU MUNISERVICES, LLC SUTA SVC-4TH QTR 2021 772.47 101 4432301 772.47 7426886 06165 B S N SPORTS, INC PARC-LOCK NET CLIPS-BULK 17,559.09 101 4645251 17,559.09 7426887 01863 BAVCO BACKFLOW PARTS 50.09 101 4633404 50.09 7426888 11028 BERKELEY RESEARCH GROUP LLC FORMATION OF DENOVO BANK-PH 1 36,463.88 101 4200301 36,463.88 7426889 06992 BREMER WHYTE BROWN & O'MEARA CLAIM#023-20/CLGL-1408A1 19,221.80 113 4230303 19,221.80 CLAIM#023-20/CLGL-1408A1 15,573.43 113 4230303 15,573.43 CLAIM #046-20/CLGL-1420A1 1,920.05 113 4230303 1,920.05 36,715.28 36,715.28
7426890 06176 C S TECH GROUP, INC CH-LABOR 955.00 112 4315302 955.00 CH- MOVING/INSTL TV-GH-OFFICE 690.00 112 4315302 690.00 MOAH-CAT6A/FIBER CABLING 26,976.04 101 4651251 26,976.04 28,621.04 28,621.04
7426891 06351 C T WEST, INC PW-MODULE-NEMA 2070 4,681.88 203 4754460 4,681.88 7426892 11102 CABALLEROS, RUDY REIM FOR FRANCHISE TAX BRD PAY 143.00 101 4820301 68.00 101 4820301 75.00
143.00 143.00

Page 2 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7426893 C2185 CLARK PEST CONTROL CH-COVID 19 CLEAN & DISINFECT 880.00 101 4431301 880.00 CH-COVID 19 CLEAN & DISINFECT 880.00 101 4431301 880.00 1,760.00 1,760.00
7426894 05830 CONVERSE CONSULTANTS PWCP 21-010-2021 FALL PAV MNG 2,512.50 701 12ST045924 2,512.50 PWCP21-014 PDSTRN GAP CLSR IMP 1,896.00 210 15SW016924 1,896.00 PWCP 22-004-2022 SMMR PVMNT MG 9,607.00 701 12ST048924 9,607.00 PWCP 22-003-2022 SPR PAV MNG 1,250.00 701 12ST047924 1,250.00 15,265.50 15,265.50
7426895 11027 CRAIG KRULL GALLERY WOODS DAVY SCULPTURE;RB 35,280.00 101 4600335 35,280.00 7426896 05147 CROSSTOWN ELECTRICAL & DATA AGR FOR MAIN SRVS RFP NO755-22 42,771.08 112 4315291 42,771.08 7426897 05696 D D L TRAFFIC INC BATTERY STOCK-MK AGM 8A24 3,991.05 211 4754763 3,991.05 7426898 09599 DAVIDSOHN, DEBBIE MOAH-FINE ART MODELING 150.00 101 4651251 150.00 7426899 D0947 ROCKWEST TECHNOLOGY GRP INC ISOPROX II CARD(600) 2,142.68 101 4220255 2,142.68 7426900 A0925 DESERT HAVEN ENTERPRISES LUC-COVID-19 CLEAN & DISINFECT 1,101.10 101 4431301 1,101.10 7426901 00414 DESERT LOCK COMPANY JRP-DEAD BOLT REPLACEMENT 162.02 101 4631402 162.02 CH-OPEN HOUSE 170.00 101 4245940 170.00 LCS-REMOV/REPLACE/MK 1,383.71 101 4633402 1,383.71 PDW-LOCK REPAIR 82.50 101 4634402 82.50 1,798.23 1,798.23
7426902 02683 DUNN-EDWARDS MAINT-TIDE CREW GRAFFITI MATER 10,501.98 203 4752501 5,436.48 203 4752502 5,065.50
10,501.98 10,501.98
7426903 09614 ENCOMPASS CONSULTANT GROUP INCPWCP 23-011 35TH ST. W ST IMPV 19,243.75 206 12ST043924 19,243.75 PWCP 23-011 35TH ST W IMPROVMT 6,167.50 206 12ST043924 6,167.50 25,411.25 25,411.25
7426904 06857 ENTERTAINMENTMAX, INC BOOKING AGNT COMM-CHEVEL SHEP 1,500.00 101 4650301 1,500.00 7426905 D3240 FASTENAL COMPANY US-MISC SMALL TOOLS 238.40 480 4755208 238.40 7426906 09588 FERGUSON ENTERPRISES LLC #1350 MOAH-LOCHINVAR IGNITOR 157.28 101 4653402 157.28 7426907 10435 FOOTHILL COMMUNICATIONS INC RADIO RENTALS(140) 2,810.00 101 4245350 2,810.00 7426908 07369 FRONTIER COMMUNICATIONS CORP 05/25-06/24/22 TELEPHONE SVC 984.88 101 4633651 984.88 7426909 02025 G & F LIGHTING SUPPLY CO. TWIST LOCK PHOTO CONTROL 22,050.00 483 4754660 22,050.00 7426910 04874 GETTY IMAGES INC GETTY IMAGES PREMIUM ACCESS 4,100.00 112 4315302 4,100.00 7426911 10888 GONZALEZ PROPERTY SVCS MNTC YD-CLEANING SERVICES 990.00 101 4245500 990.00

Page 3 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount MNTC YD-SANITIZE/DISINFECT CMN 985.00 101 4431301 985.00 PBP-VANDALISM/REPAIR BOX 465.00 101 4630460 465.00 SKT-VANDALISM/GRAFFITI RMV 690.00 101 4630460 690.00 JRP-VANDALISM/GRAFFITI RMV 650.00 101 4630460 650.00 SKT-VANDALISM GRAFFITI 785.00 101 4630460 785.00 OMP-GRAFFITI REMOVAL 685.00 101 4630460 685.00 JRP-VANDALISM-GRAFFITI RMV 975.00 101 4630460 975.00 SKT-VANDALISM/GRAFFIT RMV 790.00 101 4630460 790.00 MTNC YD-CEILING DRYWALL MATRLS 1,650.00 101 4620403 1,650.00 8,665.00 8,665.00
7426912 00849 HAAKER EQUIPMENT CO MTNC YD-SMALL MISC TOOLS 3,995.46 480 4755208 3,995.46 SEWER CLNR RNTL 04/08-05/5/22 10,500.00 484 4755602 10,500.00 14,495.46 14,495.46
7426913 03631 HARRIS & ASSOCIATES, INC. AD ANNEX SVCS 05/01-28/22 6,567.50 101 4754301 6,567.50 7426914 C4032 HOUSING RIGHTS CENTER CDBG FAIR HOUSING PROGRAM 2022 3,270.23 361 4342301 3,270.23 7426915 A8868 I B M CORPORATION 05/22-CLOUD PAY PER USE 360.84 490 4791301 360.84 7426916 11090 JACKSON, RAJAEE JUNETEENTH-PHOTOGRAHY/DRONE 1,760.00 101 4820304 1,760.00 7426917 04439 JAM SERVICES PEDESTRIAN COUNTDOWN MODULE 5,512.50 211 4754295 5,512.50 7426918 01419 JOHNSTONE SUPPLY MTNC YD-MOTOR 83.45 101 4633403 83.45 7426919 05301 KIMBALL MIDWEST CHRIS/ SIGNS VERBAL 777.26 203 4754455 777.26 7426920 11103 KING, ANDREA SECURITY DEPOSIT REFUND 275.00 101 3401805 275.00 7426921 10754 KTGY GROUP, INC 04/16-05/13/22-LANC PKWY VILLG 7,075.00 349 4770771 7,075.00 7426922 A9432 L A CO REGISTRAR-RECORDER/CLRK 04/22-ELECTRONIC RECORDING 20.00 306 4792212 20.00 7426923 10162 LANDSCAPE CONNECTION GROUP TBP-SPLASH PAD CONCRETE 22,480.00 227 11BS036924 22,480.00 7426924 D3426 LAW OFFICES CHRISTOPHER RAMSEYCLAIM #040-19/CLGL-1400A1 4,329.00 113 4230303 4,329.00 7426925 10283 LSY ENTERPRISE INC TRAFFIC MGMT CENTER DEVT 640.00 210 15BR004924 640.00 TRAFFIC MGMT CENTR PWCP 20-006 1,120.00 203 15ST058924 1,120.00 TRAFFIC MGMT CENTER DEVT 3,840.00 207 11BS027924 1,132.80 321 11BS027924 2,707.20
TRAFFIC MGMT CENTER DEVT 760.00 210 15BR004924 760.00 6,360.00 6,360.00
7426926 1300 M M A S C MMASC MEMBERSHIP RENEWAL-FULLM 90.00 490 4250206 90.00 7426927 01386 MERRIMAC ENERGY GROUP DIESEL(2181) UNLEADED(5327) 44,721.26 111 4753217 44,721.26 7426928 06966 MICHAEL BAKER INT'L INC C. LANCASTER/ 03252022 30,238.47 101 4770316 30,238.47

Page 4 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7426929 D3578 MINUTEMAN PRESS CH-CERTIFICATES/STAMP 1,757.24 101 4100261 1,757.24 LETTER CERTIFICATE HOLDER-1000 1,856.61 101 4100261 1,856.61 CH-LETTER CERT HOLDER(1000) 1,856.61 101 4100261 1,856.61 CERTIFICATES-LEGAL SIZE(1000) 1,561.54 101 4100261 1,561.54 CH-CALPINE PSH NOTICE(368) 263.88 490 4250213 263.88 CH-CALPINE PSH NOTICE(395) 223.50 490 4250213 223.50 7,519.38 7,519.38
7426930 05773 MORRISON WELL MAINTENANCE LNSC- MONTHLY TEST 05/22 200.00 101 4635301 200.00 7426931 09535 NAT'L COMMUNITY DVLPMNT ASSOC ANN MEMBERSHIP 7/1/22-6/30/23 1,545.00 306 4792200 772.50 361 4342301 772.50
1,545.00 1,545.00
7426932 C7808 OPSEC SPECIALIZED PROTECTION JRP-OVERNIGHT SECURITY 1,963.00 101 4630460 1,963.00 JRP-OVERNIGHT SECURITY 1,170.00 101 4630460 1,170.00 JRP-OVERNIGHT SECURITY 1,560.00 101 4630460 1,560.00 JRP-OVERNIGHT SECURITY 1,170.00 101 4630460 1,170.00 5,863.00 5,863.00
7426933 05916 PASTPERFECT SOFTWARE INC ANNUAL RENEWAL-CUSTOMER #38432 540.00 112 4315302 540.00 7426934 05998 PAVING THE WAY FOUNDATION CMMNTY SPPRT/GOOD CTZNSHP PRGM 520.00 101 4820301 520.00 CMMNTY SPPRT/GOOD CTZNSHP PRGM 520.00 101 4820301 520.00 1,040.00 1,040.00
7426935 08967 PIONEER ATHLETICS LNSC-NET REPAIR 1,995.54 101 4649575 1,995.54 LNSC-GOAL STAKES 1,196.50 101 4635404 1,196.50 3,192.04 3,192.04
7426936 10987 RESIDENCE INN LANCASTER CS-MOAH-LDG-06/19/22 1,170.66 101 4650257 1,170.66 7426937 07507 RESOURCE BUILDING MATERIALS CONCRETE MIX 258.88 480 4755410 258.88 7426938 11088 RESURRECTION CYCLES INC. SBSP/BICYCLE REPAIRS 189.63 101 4771208 189.63 SBSP/BICYCLE REPAIRS 553.65 101 4771208 553.65 743.28 743.28
7426939 C3886 RIGEL PRODUCTS AND SERVICES COBRA COMBI REPAIRS 5,093.55 203 4754765 5,093.55 7426940 05934 SHI INTERNATIONAL CORP SPLUNK CLOUD SUBSCRIPTION 40,950.00 112 4315302 40,950.00 7426941 11104 SIEW H. NG & JENNY CHIA RL GRADING SEC TR 061600 8,800.00 101 3202100 8,800.00 REL MONU SEC TR 061920 33,922.00 101 3202100 11,350.00 482 3102100 8,968.32
483 3100100 7,998.48
484 3100100 5,605.20
42,722.00 42,722.00
7426942 D3461 SMARTCOVER SYSTEMS ANNUAL SMART COVER RENEWAL 2,104.00 101 4634301 2,104.00

Page 5 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7426943 01816 SMITH PIPE & SUPPLY INC LNSC-HEADS 87.56 101 4635404 87.56 TBP-IRRIGATION 959.37 101 4631404 959.37 WCP-IRRIGATION SUPPLY 247.56 101 4631404 247.56 EDP-IRRIGATION SUPPLY 204.90 101 4631404 204.90 1,499.39 1,499.39
7426944 A2089 SO CA EDISON-ACCTS REC ST LT INSTALL-SVC REQ #3243896 342.52 210 15SW016924 342.52 7426945 1997 SO CA MUNICIPAL ATHLETIC FED LR-BASKETBALL KITS 168.00 101 4641251 168.00 7426946 10962 STALKER RADAR STALKER LIDAR XLR 12,463.76 101 4820355 12,463.76 7426947 06429 STANTEC CONSULTING SRVCS INC PWCP_23-010-SIERRA HWY 5,532.00 701 12ST042924 5,532.00 PWCP_23-010-SIERRA HWY 5,109.00 701 12ST042924 5,109.00 10,641.00 10,641.00
7426948 08717 TABORDA SOLUTIONS, INC CREATIVE CLOUD & ACROBAT PRO 5,005.60 112 4315302 5,005.60 7426949 A6479 TAFT ELECTRIC COMPANY MTNC-YD AVE J-4/6/2022 16,759.02 203 4754460 16,759.02 7426950 09316 TEKWERKS INTERNET 05/22-REMOTE MONITORING 1,995.00 112 4315651 1,995.00 7426951 D2568 TESLA, INC CH-05/22 (83648.16 KWH) 8,364.82 101 4633652 8,364.82 MTNC YD-05/22(53681.04) 5,368.10 101 4633652 5,368.10 OMP-5/22 (7,094.22 KWH) 709.42 101 4634652 709.42 PAC-05/22 (33,435.04 KWH) 3,343.50 101 4650652 3,343.50 LMS-05/22 (19101.52 KWH) 1,910.15 101 4632652 1,910.15 19,695.99 19,695.99
7426952 09493 THE ECOHERO SHOW LLC LIVE-STREAM PERFORMANCES 950.00 101 4754771 950.00 CONTENT CREATION 1,000.00 101 4754251 500.00 330 4754781 500.00
1,950.00 1,950.00
7426953 C5522 THOMSON REUTERS-WEST PMT CENTRONLINE/05/22-SUBSCRIPCHARG 1,214.40 101 4245301 1,214.40 7426954 2003 TIP TOP ARBORISTS, INC 05/22 VARIOUS TREE TRIMMING 230.00 483 4636267 230.00 05/22 VARIOUS TREE TRIMMING 345.00 482 4636267 345.00 05/22-TREE TRIM/REMOVAL/SVC 12,475.00 203 4636267 12,475.00 13,050.00 13,050.00
7426955 10638 TITAN WATER TECHNOLOGY INC 06/22 CH-WATER TREATMENT 569.25 101 4431301 569.25 7426956 A7515 U S BANK 04/22-03/23 ADMIN FEES 1,575.00 101 3501110 1,575.00 05/22-04/23 ADMIN FEES 1,800.00 991 4240962 1,800.00 3,375.00 3,375.00
7426957 08783 UNIFIRST CORPORATION UNIFORM CLEANING 95.69 480 4755209 95.69 UNIFORM CLEANING 132.95 480 4755209 132.95 228.64 228.64

Page 6 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7426958 04496 VULCAN MATERIAL WESTERN DIV COLD MIX 128.06 203 4752410 128.06 COLD MIX 174.90 203 4752410 174.90
302.96 302.96
7426959 31026 WAXIE SANITARY SUPPLY AVTA-TRASH BAGS 605.77 207 4634406 605.77 7426960 04627 Z A P MANUFACTURING INC REFURB LABOR CLEAN 1,084.37 203 4754455 1,084.37 7426961 2501 ZUMAR INDUSTRIES, INC PWS-MATERIAL FOR SIGNS 14,126.80 203 4754455 14,126.80 PW-STREET SIGNAGE 23,467.28 203 4754463 23,467.28 TRAFFIC CONTROL SIGNS/HARDWARE 5,126.09 203 4754463 5,126.09 42,720.17 42,720.17
7426962 C8888 AMERICAN PREMIERE HOMES PER LOT DRAINAGE REIMBRS 197,903.98 220 17SD021924 197,903.98 7426963 C8888 AMERICAN PREMIERE HOMES TR-60614-PER LOT DRAIN REIMBRS 318,424.40 220 17SD021924 318,424.40 7426964 04380 BOWE CONTRACTORS, INC CDP 21-08 CITY HALL RENOVATION 81,642.98 101 11BS019924 25,686.54 150 2100003 (4,297.00)
701 11BS019924 60,253.44
81,642.98 81,642.98
7426965 A7061 C A RASMUSSEN, INC CP21-014/ PEDES GAP CLSR IMPRV 901,541.26 150 2100003 (47,449.54) 206 15SW016924 247,945.60
211 15SW016924 142,348.62
399 15SW016924 558,696.58
CP21014 PEDS GAP CLSR IMPR 907,652.99 150 2100003 (47,771.21) 206 15SW016924 297,761.92
211 15SW016924 143,313.63
399 15SW016924 514,348.65
1,809,194.25 1,809,194.25
7426966 05841 C S LEGACY CONSTRUCTION, INC CP21024-SKYTOWER PRK RENO 345,354.01 150 2100003 (18,176.53) 701 11BS034924 363,530.54
345,354.01 345,354.01
7426967 09916 CA PROF ENGINEERING INC CP21019-2021 SAFER ST ACTN PLN 177,292.75 150 2100003 (9,331.20) 209 16ZZ001924 186,623.95
177,292.75 177,292.75
7426968 08245 GOLDEN STATE LABOR COMPLIANCE FB-729-20 2022 CH RENO/ MODERN 2,596.28 701 11BS019924 2,596.28 PWCP 19-002 10TH ST W & AVE J 1,709.81 203 12ST039924 1,709.81 PWCP 21-008 REBID 2021 NGH IMP 2,952.54 701 15ST079924 2,952.54 PWCP 21-009 21 SUMMER PVMNT MG 3,566.88 701 12ST046924 3,566.88 PWCP 21-010 2021 FALL PMP 3,825.59 701 12ST045924 3,825.59 PWCP 21-024 SKYTOWER PARK RENO 1,838.39 701 11BS034924 1,838.39 PWCP 22-004 2022 SMR PAV MNG 22,121.28 701 12ST048924 22,121.28 pwcp 21-014 PED CAP PAV CLS IM 22,522.10 210 15SW016924 22,522.10 61,132.87 61,132.87
7426969 A8656 KIMLEY-HORN & ASSOCIATES INC AVE K INTERCHANGE 10,147.75 210 15BR004924 497.75

Page 7 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 210 15BR004924 9,650.00
AVE M INTERCHANGE 2,810.00 210 15BR005924 2,810.00 AVE J INTERCHANGE 18,822.50 210 15BR007924 18,822.50 67,052.88 203 15ST058924 2,155.00
209 15ST058924 38,484.44
321 15ST058924 26,413.44
98,833.13 98,833.13
7426970 C7946 L A CO DEPT ANIMAL CARE&CONTRL 05/22-HOUSING COSTS 127,516.78 101 4820363 127,516.78 7426971 05238 L V H ENTERTAINMENT SYSTEMS PAC-LED LIGHT SYSEM PY#2 219,384.66 101 11BS022924 64,567.43 213 11BS022924 127,413.92
226 11BS022924 552.91
227 11BS022924 18,307.91
228 11BS022924 8,542.49
219,384.66 219,384.66
7426972 09826 ACME ASSET PROTECTION SERVICES 05/22-SECURITY SVCS-MTNC-YD 14,269.50 203 4752301 14,269.50 7426973 C8559 AUNE, CHRIS CA-PR DM-SAN DIEGO-07/10-07/15 407.00 101 4220256 407.00 7426974 08754 CA MUNICIPAL COMPLNCE CNSLTNTS 06/22-PS-CONSULTING SVCS 31,593.30 101 4800301 31,593.30 7426975 D0775 CAUDLE, JASON JC-PR DM-SAN FRAN-07/14-15/22 118.50 101 4200201 118.50 7426976 10918 EMPOWER PERMITTING PMT21-04170 WITHDRAWN PR CM RQ 91.80 101 3201104 (73.00) 101 3201104 (41.20)
101 3201104 206.00

91.80 91.80
7426977 11096 GOETHE, D MYLES CARICATURE ARTIST FOR EVENT 300.00 101 4649225 300.00 7426978 C3703 HOPPS, DAVID DH-PANT REIMBURSEMENT 500.00 203 4752220 500.00 7426979 04935 JOHN, KEITH JK-MILEAGE RMBRS-JNTH EV-(116) 67.86 106 4430355 67.86 7426980 04935 JOHN, KEITH JK-REIMB-ITEMS PRCH-JUNETEENTH 210.50 106 4430355 9.92 106 4430355 95.58
106 4430355 105.00
210.50 210.50
7426981 D0412 KATZ, BRUCE BK-PR DM-SAN DIEGO-07/11-15/22 333.00 480 4755201 111.00 480 4755201 222.00
333.00 333.00
7426982 11115 LPAC FOUNDATION SHOWARE PATRONS AFY DONATIONS 1,689.55 101 2102600 1,741.80 101 3405302 (52.25)
1,689.55 1,689.55
7426983 11115 LPAC FOUNDATION 2022 PACF SPEAKEASY TKT/CHP SL 2,760.00 101 3405104 2,820.00 101 3405302 (60.00)
2,760.00 2,760.00

Page 8 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7426984 11113 ORELLANA, ROSA RO-MILG -DOWNEY-05/31-06/2/22 294.84 101 4771203 294.84 7426985 11113 ORELLANA, ROSA RO-PR DIEM-PALM SPRG-06/27-29 326.94 101 4771201 51.75 101 4771201 51.75
101 4771201 69.00
101 4771203 154.44
326.94 326.94
7426986 D0100 PARRIS, R REX RP-PR DM-SAN FRAN-7/14-15/22 118.50 101 4100202 118.50 7426987 11031 SHELMAN, DEANNA DS-PR DM-ESRI-SD-7/11-15/22 330.00 101 4220256 330.00 7426988 03154 SO CA EDISON 05/18/22-06/16/22 ELECTRIC SVC 28.30 483 4754660 28.30 7426989 03154 SO CA EDISON 05/18/22-06/21/22 ELECTRIC SVC 1,260.23 101 4600603 516.08 101 4633652 80.83
101 4636402 342.06
482 4636652 143.41
483 4754660 17.70
483 4754660 65.74
483 4754660 94.41
1,260.23 1,260.23
7426990 1907 SO CA GAS COMPANY 05/19-06/27/22 GAS SVC 444.73 101 4620655 21.79 101 4620655 37.83
101 4620655 101.93
101 4631655 1.48
101 4631655 1.66
101 4631655 2.24
101 4633655 48.70
101 4633655 115.18
101 4634655 72.84
101 4635655 41.08
444.73 444.73
7426991 D0617 STEWART, BENJAMIN BS-PR DIEM-SAN DEG-06/11-15/22 333.00 480 4755201 111.00 480 4755201 222.00
333.00 333.00
7426992 07266 THOMAS, JOSH REIMB-PARKS MAKE LIFE BETTER 299.80 101 4649225 299.80 7426993 07177 VANDER HYDE, CANDICE CV-PRDM-ALHAMBRA-06/22 87.05 101 4771203 87.05 7426994 11119 WALKER, LOURIE LW-REIM FOR ITM PRCHD JUNETNTH 115.15 106 4430355 55.07 106 4430355 60.08
115.15 115.15
7426995 C8775 WORRELL, JULIE JW-PR DM-SAN DIEGO-7/11-15/22 333.00 480 4755201 111.00 480 4755201 222.00
333.00 333.00

Page 9 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7426996 08290 4WALL ENTERTAINMENT INC FOG FLUID HAZE LUM 4 LITRE 174.10 101 4650251 174.10 ROADCASE 19"-23" MONITOR DUAL 943.89 101 4650602 943.89 1,117.99 1,117.99
7426997 06576 A V CHEVROLET GMSPO/ EQ5662 566.73 111 4753207 566.73 7426998 03854 A V JANITORIAL SUPPLY STADIUM-CABINETS/STORAGE 5,457.38 101 4632403 5,457.38 7426999 08979 A V PEST CONTROL OMP-PEST CONTROL 190.00 101 4634301 190.00 7427000 10165 ADT COMMERCIAL LLC LMS-ALARM SERVICE 48.67 101 4632301 48.67 7427001 05956 ADVANCED PRINTING & GRAPHICS PREMIUM FULL COLOR VINYL 1,723.21 101 4771301 1,723.21 7427002 07741 AGRI-TURF DISTRIBUTING LLC MAINT-ROUNDUP PRO CONCENTRATE 28,966.13 203 4752266 24,999.98 484 4752266 3,966.15
28,966.13 28,966.13
7427003 D3147 AMERICAN PLUMBING SERVICES,INC CH-PLUMBING SERVICE CALL 327.82 101 4620403 327.82 LMS-SINK REPAIR 262.50 101 4632402 262.50 BACK FLOW REPAIR 760.00 101 4633402 760.00 OMP-URINAL REPAIR 765.30 101 4634402 765.30 OMP-DIAGNOSTICS 190.25 101 4633402 190.25 2,305.87 2,305.87
7427004 08974 AMOBIUS GROUP INC 06/22-07/22 VERIBOOK SUBSCRPT 300.00 101 4210251 300.00 07/01-31/22 VERIBOOK SUBSCRPT 600.00 101 4600259 600.00 900.00 900.00
7427005 09751 ARMSTRONG, ALVIN JR 06/20-SPORTS OFFICIAL 200.00 101 4641308 200.00 7427006 C9805 ARROW TRANSIT MIX INC READY MIX CONCRETE 695.02 203 4752410 695.02 READY MIX CONCRETE 771.10 203 4752410 771.10 READY MIX CONCRETE 865.36 203 4752410 865.36 READY MIX CONCRETE 614.54 203 4752410 614.54 READY MIX CONCRETE 636.59 203 4752410 636.59 3,582.61 3,582.61
7427007 10369 AUDIO VISUAL LIVE, INC EQUIP RNTL-AUDIO 775.00 101 4650602 775.00 7427008 07112 AV ACTION AIR INC LMS-REPAIR THIRD BASE SIDE RFG 1,301.88 101 4632402 1,301.88 LMS-REPAIR FIRST BASE KER RFG 190.00 101 4632402 190.00 1,491.88 1,491.88
7427009 D0879 B'S EMBROIDERY ETC, INC STAFF HATS 1,300.95 101 4649209 1,300.95 7427010 C3061 BATES, JOE JUNE 08 SPORTS OFFICAL 276.00 101 4641308 276.00 7427011 01863 BAVCO FEBCO REPAIR KITS 649.94 482 4636404 649.94 7427012 06639 BOOT BARN INC UNION STAFF WORK BOOTS/PANTS 2,719.22 101 4631209 436.57

Page 10 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 101 4631209 498.06
101 4634209 600.00
101 4635209 135.87
203 4752220 233.17
480 4755220 116.31
480 4755220 349.24
480 4755220 350.00
2,719.22 2,719.22
7427013 08187 C F E E 2022 CFEE GENERAL BOARD-JC 21,000.00 101 4200251 21,000.00 7427014 A9249 CA DEPT OF CORRCTNS/REHAB 05/22 GUARDING AGMT# C5608268 4,814.00 203 4752308 3,417.94 484 4752308 1,396.06
4,814.00 4,814.00
7427015 04597 CA TOOL & WELDING MTNC YD-GLOVES 232.63 111 4753207 232.63 MTNC YD-MISC SMALL TOOLS 1,904.57 111 4753207 1,904.57 2,137.20 2,137.20
7427016 11106 CAL STATE UNIVERSITY, FRESNO MF-ECONOMIC DEVELOPMENT CERT 700.00 101 4790200 700.00 7427017 10054 CAL STRIPE INC CP21018-TRAFFIC CALMING 8,104.50 150 2100003 8,104.50 7427018 11121 CALED MEMBERSHIP RENEWAL INVOICE 1,183.65 101 4790340 1,183.65 7427019 C0914 CAMPBELL II, EDWARD LEE 06/22-SPORTS OFFICIAL 598.00 101 4641308 598.00 7427020 09640 CANNON CORPORATION CDP 18-05-PERMIT PLAN CHECKING 3,506.16 101 4761301 3,506.16 CDP 18-05-PERMIT PLAN CHECKING 18,132.42 101 4761301 18,132.42 CDP 18-05-PERMIT PLAN CHECKING 12,947.89 101 4761301 12,947.89 34,586.47 34,586.47
7427021 00382 CARRIER COMMUNICATIONS 07/22-HAUSER MTN SITE RENT 654.32 101 4245350 654.32 7427022 05938 CENTERSTAGING LLC PAC-BACKLNE EQPMNT-LEA SALONGA 1,200.00 101 4650602 1,200.00 7427023 C2185 CLARK PEST CONTROL CH-COVID 19 CLEAN & DISINFECT 880.00 101 4431301 880.00 7427024 11094 CLEMMONS, KALONDA LANC-JUNETEENTH CLB KID ZONE 705.00 106 4430355 705.00 7427025 10309 CLIFTON LARSON ALLEN LLP FY 20/21 INTERIM BILLING 5,500.00 101 4432304 5,500.00 7427026 08516 CODY, RAYMOND 06/22 SPORTS OFFICAL 200.00 101 4641308 200.00 7427027 C0054 COLE-ROUS, JOHN 06/22- SPORTS OFFICIAL 161.00 101 4641308 161.00 7427028 08484 CONSOLIDATED ELECTRCL DIST INC POLE LIGHTS 920.30 483 4754660 920.30 LIGHT POLES 179.16 483 4754660 179.16
AVE I UNDERPASS 180.28 483 4754660 180.28 1,279.74 1,279.74
7427029 00794 CORRALES, RUDY 06/22-SPORTS OFFICIAL 207.00 101 4641308 207.00

Page 11 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7427030 07545 COSTAR REALTY INFORMATION INC 06/22-PROFESSIONAL SERVICES 1,196.45 101 4790301 1,196.45 7427031 11105 CUEVAS, RAUL PMT22-01342 WITHDRAWN PR SM 176.00 101 3201103 176.00 7427032 D0947 ROCKWEST TECHNOLOGY GRP INC BADGEPASS NXT5000 PRINTER 1,595.00 101 4220301 1,595.00 7427033 00414 DESERT LOCK COMPANY LMS-SERVICE TRIP & PB REPAIR 115.00 101 4632402 115.00 CH- KEY(60) 314.21 101 4633403 314.21
LNSC-WEST AC LOCK REPAIR 70.00 101 4635402 70.00 TBP-LOCK REPAIR 62.50 101 4631402 62.50 561.71 561.71
7427034 11099 DUGAN, MALIK CS-MUSIC PERF 05/22 200.00 101 4651251 200.00 7427035 08839 DUKE ENGINEERING AND ASSOCS CVL/ELEC DGN PLN FR ALRM SYSTM 18,000.00 701 11BS019924 18,000.00 7427036 11107 EDY'S PLUMBING, INC PMT22-03628 WD RPL PMT22-02827 402.00 101 3201102 8.00 101 3201102 14.00
101 3201102 30.00
101 3201102 112.00
101 3201102 238.00
402.00 402.00
7427037 05665 EGGERTH, DARRELL 06/22 SPORTS OFFICIAL 736.00 101 4641308 736.00 7427038 11114 ELENA H &LAW OFFICE OF JACOB E DEFENSE BILLING-SETTLEMENT 22,415.00 113 4230300 22,415.00 7427039 11078 ELITE SPORTS APPAREL USA INC THE BIG 8 ES 2012 CSTM JERSEY 8,274.26 101 4641251 8,274.26 7427040 09575 ENTERPRISE FM TRUST PW-MONTHLY VEHICLE LEASE 14,700.64 101 4431295 9,825.48 111 4753752 4,875.16
14,700.64 14,700.64
7427041 C9406 ESTES, MAURICE 06/22 SPORTS OFFICIAL 138.00 101 4641308 138.00 7427042 09588 FERGUSON ENTERPRISES LLC #1350 MOAH-MAIN CNTL BOARD 1,307.25 101 4651403 1,307.25 7427043 D1793 FISH WINDOW CLEANING LMS-WINDOW CLEANING 47.00 203 4752403 47.00 7427044 11072 FISHER NETS, INC BATTING CAGE NETTING -DEPOSIT 11,694.00 101 4645251 11,694.00 7427045 08441 FRANKLIN TRUCK PARTS INC LED MINI BAR/ EQ5510/EQ5511 702.38 111 4753207 351.19 111 4753207 351.19
702.38 702.38
7427046 11117 GEOLINGUA, INC. DEFENSE BILLING-JOSE B GUZMAN 450.00 113 4230303 450.00 7427047 10888 GONZALEZ PROPERTY SVCS OMP-GRAFFITI REMOVAL 685.00 101 4630460 685.00 OMP-GRAFFITI REMOVAL 490.00 101 4630460 490.00 PDW-GATE REPAIR 685.00 101 4630460 685.00 CC-LIGHT REPAIR/ODOR TRTM SVC 485.00 101 4633402 485.00

Page 12 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount MTNC YD-SANITZE/DISINFECT SVC 985.00 101 4431301 985.00 STP-PRESSURE WASH MURAL WALL 650.00 101 4600335 650.00 STP-MURAL ANTI-GRAFFITI CT SVC 2,550.00 101 4600335 2,550.00 STP-MATERIAL FOR WALL COATING 800.00 101 4600335 800.00 TBP-BENCH REPAIR 485.00 101 4631402 485.00 7,815.00 7,815.00
7427048 03430 GRAINGER COLD/COOL AIR SYSTM HOSE 258.42 111 4753207 258.42 7427049 11041 GUANDIQUE, JORGE MARIO 06/22 SPORTS OFFICIAL 874.00 101 4641308 874.00 7427050 05822 H & H AUTO PARTS WHOLESALE EQ1525-OIL, FILTER 88.46 111 4753207 88.46 EQ3000-OIL, FILTER 60.76 111 4753207 60.76 SENSOR TIRE PRESS/EQ7769 79.26 111 4753207 79.26 228.48 228.48
7427051 07201 HALL JR, CHARLES 06/22 SPORTS OFFICIAL 575.00 101 4641308 575.00 7427052 02585 HARRELL, BARON 06/22 SPORTS OFFICIALS 644.00 101 4641308 644.00 7427053 06058 HAYNES SALES PW-PRESSURE HOSE/LACE WAND/GUN 1,528.62 203 4752230 1,528.62 7427054 819 HERC RENTALS INC LMS-LED TRAILER 4,004.18 101 4431295 4,004.18 LMS-CABLE RAMP 1,588.41 101 4431295 1,588.41 LMS-CABLE RAMP 1,075.22 101 4431295 1,075.22 6,667.81 6,667.81
7427055 09070 INSIGHT NORTH AMERICA LLC 05/22-INVESTMENT ADVISORY SRVC 2,870.62 101 3501110 2,870.62 7427056 A2594 INTERSTATE BATTERY SYS OF A V BATTERY-EQ3998/EQ3999 376.03 111 4753207 376.03 7427057 11065 JAMES+JAMES LLC CH-606 STDIOS PDSTL TABLE 3,583.14 101 4651251 3,583.14 7427058 11047 KARISH INDUSTRIES PW-WIRE OVERHEAD FED POLES 3,004.31 483 4754665 3,004.31 7427059 D1903 KERN MACHINERY INC-LANCASTER JDC- PIN/EQ5846 34.99 111 4753207 34.99 JDC-SEAT/ EQ5618 521.26 111 4753207 521.26 JDC-SEAT/ EQ5762 188.78 111 4753207 188.78 JDC-FUEL/OIL/AIR/FILTER/EQ5846 257.02 111 4753207 257.02 LNSC-GATOR GAS CAP 88.14 101 4635230 88.14 1,090.19 1,090.19
7427060 A8656 KIMLEY-HORN & ASSOCIATES INC PED GAP CONST SUPPORT 4,800.00 210 15SW016924 4,800.00 7427061 09226 KONA ICE OF LANCASTER JUNETEENTH-KLASSIC 560.00 106 4632770 560.00 7427062 10162 LANDSCAPE CONNECTION GROUP BLOCK WALL REPAIR-LNC BLV 31ST 375.00 203 4636264 375.00 WALL REPAIR-30TH EASR LANCSTR 1,250.00 203 4636264 1,250.00 OMP-MAIN LINE REPAIR 475.00 101 4634402 475.00 FENCE REPAIR-L-12 AND 57TH W 4,250.00 203 4752402 4,250.00 6,350.00 6,350.00

Page 13 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7427063 D3426 LAW OFFICES CHRISTOPHER RAMSEYCLAIM #055-20/CASE#21STCV07841 13,802.00 113 4230303 13,802.00 7427064 D1736 LEVEL 3 COMMUNICATIONS LLC 06/22-INTERNET/DATA 3,744.32 112 4315651 3,744.32 7427065 08387 LOOMIS 05/22-ARMORED CAR SVC INLC EXC 1,201.98 101 3501110 1,201.98 7427066 11083 LOUANGXAY, DANNY CS-MUSIC PERF 150.00 101 4651251 150.00 7427067 5191 LU'S LIGHTHOUSE, INC LED MINI BAR/ EQ1552/EQ1553 2,134.63 111 4753207 1,067.31 111 4753207 1,067.32
2,134.63 2,134.63
7427068 04351 LYN GRAFIX PAC STAFF UNIFORMS 6,528.82 101 4650209 6,528.82 7427069 10942 MAXX PRODUCTION SALES PAC- PROJ/LENSES/FRAME 23,258.30 101 4650755 23,258.30 7427070 D3578 MINUTEMAN PRESS CH-3 A-FRAME INSERTS/STANDS 452.58 101 4220301 452.58 CH-A-FRAME INSERTS-TESTING SIT 278.38 101 4431305 278.38 730.96 730.96
7427071 10894 MSI TEC INC TMC-EQUIPMENT FOR TMC PROJECT 16,627.94 209 11BS027924 4,905.24 321 11BS027924 11,722.70
16,627.94 16,627.94
7427072 08562 NAPA AUTO PARTS MTNC YD-BLUE DEF 2.5 GAL 176.29 101 4245500 176.29 MTNC YD-SPORTSMAN JUG 52.36 101 4245500 52.36 EQ3776 77.49 111 4753207 77.49
EQ1540 50.09 111 4753207 50.09
EQ1745 25.13 111 4753207 25.13
EQ5725 6.27 111 4753207 6.27
EQ3776 78.82 111 4753207 78.82
EQ5762 54.15 111 4753207 54.15
EQ7519/EQ4362 138.87 111 4753207 69.43
111 4753207 69.44
EQ5618 36.79 111 4753207 36.79
EQ5618 20.80 111 4753207 20.80
EQ5664 89.53 111 4753207 89.53
EQ5664 31.96 111 4753207 31.96
EQ3000 14.80 111 4753207 14.80
EQ1553 154.24 111 4753207 154.24
EQ1552 57.29 111 4753207 57.29
EQ3766 11.83 111 4753207 11.83
EQ3769 16.75 111 4753207 16.75
EQ1553 6.27 111 4753207 6.27
1,099.73 1,099.73
7427073 06513 ODYSSEY POWER CORP CH-GENERATOR SRVS CALL-REPAIR 1,530.00 101 4633301 1,530.00 7427074 C7808 OPSEC SPECIALIZED PROTECTION JRP-OVERNIGHT SECURITY 1,170.00 101 4630460 1,170.00 7427075 06984 PACIFIC DESIGN & INTEGRATION 06/22-BROADCAST MANAGER SVC 5,450.00 112 4315301 5,450.00

Page 14 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7427076 09496 PAY PLUS SOLUTIONS 07/22-CALPERS MONTHLY CHARGES 327.00 101 4220301 327.00 7427077 06160 PRIME TIME PARTY RENTALS TBL/CHR/TENT/WTR BARREL RENTAL 434.50 106 4632770 434.50 7427078 05864 QUINN COMPANY EQ3774 279.45 111 4753207 279.45 7427079 11118 RAMSEY, CHRIS DEFENSE BILLING 4,381.00 113 4230303 4,381.00 7427080 11116 RIOS, JOSE DE JESUS PF-READING 150.00 101 4649567 150.00 7427081 10977 RONALD CHATTERS III REIMB-BB/AMZ/LOW/ALMART/TARGET 3,728.69 101 4820304 1,403.19 106 4430355 2,325.50
3,728.69 3,728.69
7427082 03962 SAFETY KLEEN DISPOSAL 4 CUBIC YRD BX FLM 6,384.00 101 4754657 6,384.00 AUTOMATIC PARTS WASHER 2,780.78 101 4754657 2,780.78 9,164.78 9,164.78
7427083 C3064 SANTOS, RENALDO 06/22-SPORTS OFFICIAL 1,127.00 101 4641308 1,127.00 7427084 11091 SCRIBE LICENSES-(10) ANNUAL COAST 5,439.00 112 4315302 5,439.00 7427085 08337 SILVER LINING SOLUTIONS LLC 05/22-GENERAL SUPPORT 13,600.00 112 4315302 13,600.00 7427086 D3461 SMARTCOVER SYSTEMS ANNUAL SMART COVER RENEWAL 13,352.95 480 4755402 13,352.95 7427087 01816 SMITH PIPE & SUPPLY INC RDP-VALVES 704.42 101 4634404 704.42 RDP-SLOENOID 206.12 101 4634404 206.12
910.54 910.54
7427088 05339 SNAP-ON INDUSTRIAL MTNC YD-UNDERGROUND SERVICE AL 973.86 111 4753208 973.86 MTNC-YD-UNDERGROUND SERVICE AL 96.67 111 4753208 96.67 MTNC-YD-UNDERGROUND SERVICE AL 123.52 111 4753208 123.52 MTNC YD-UNDERGROUND SERVICE AL 120.34 111 4753208 120.34 MTNC-YD-UNDERGROUND SERVICE AL 185.29 111 4753208 185.29 1,499.68 1,499.68
7427089 10999 SONIA-WALLACE, BRIAN MOAH- TYPWRT PURCHASE FR INSTL 200.00 101 4651251 200.00 7427090 10868 STERICYCLE INC COMPLIANCE SOLUTIONS 6/22-7/22 380.86 101 4220301 380.86 7427091 09493 THE ECOHERO SHOW LLC VIRTUAL SCHOOL ASSEMBLY 3,850.00 330 4754781 3,850.00 7427092 2009 THE TIRE STORE FLAT REPAIR/ EQ1521 15.00 111 4753207 15.00 7427093 11098 THETEESHOPLLC T-SHIRTS (36) /ARTWORK(1) 452.03 106 4430355 452.03 7427094 04239 TIM WELLS MOBILE TIRE SERVICE EQ5844 141.53 111 4753207 141.53 EQ5704 88.61 111 4753207 88.61
EQ5866 281.07 111 4753207 281.07
EQ3790 407.62 111 4753207 407.62

Page 15 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount EQ5662 689.55 111 4753207 689.55
EQ3824 1,379.11 111 4753207 1,379.11
EQ5860 39.85 111 4753207 39.85
EQ1510 20.00 111 4753207 20.00
3,047.34 3,047.34
7427095 08783 UNIFIRST CORPORATION UNIFORM CLEANING 224.23 480 4755209 224.23 UNIFORM CLEANINGS 64.07 101 4754209 32.03 111 4753209 32.04
288.30 288.30
7427096 05551 UNITED SITE SRVCS OF CA,SO DIV FENCE RENTAL-06/10-07/07/22 61.74 101 4633301 61.74 7427097 31009 UNIVERSAL ELECTRONIC ALARMS CH-TROUBLESHOOT S/W DOOR 190.00 101 4633402 190.00 CH-FAULTED POINTS ZONE 3/16 190.00 101 4651402 190.00 380.00 380.00
7427098 11120 VIDAL, JAIME SMITH REFUND-PARKING CITATION FINE 39.00 101 3310200 39.00 7427099 C2434 VINSA INSURANCE ASSOCIATES PRISM-UST POLLUTION RENEW 2,646.60 101 4230260 2,646.60 7427100 C9394 VORTEX INDUSTRIES PRA-REPAIR RESET ONE (1) EXIST 4,248.00 101 4650403 4,248.00 7427101 04496 VULCAN MATERIAL WESTERN DIV COLD MIX 113.80 203 4752410 113.80 COLD MIX 113.80 203 4752410 113.80
227.60 227.60
7427102 06209 WAGEWORKS 06/22-FSA ADMIN FEES 502.28 101 2170213 502.28 7427103 31026 WAXIE SANITARY SUPPLY PAC-JANITORIAL SUPPLIES 474.69 101 4633406 474.69 PAC-JANITORIAL SUPPLIES 1,147.97 101 4651406 1,147.97 1,622.66 1,622.66
7427104 10249 WE THE CREATIVE OUTLOOK MAG-SUMMER 2022 5,682.35 101 4205301 5,682.35 7427105 07614 WILSON, ALASTAIR C CS-PERF MUSIC- 07/07/22 1,000.00 101 4649225 1,000.00 7427106 10864 WINCO FOODS, LLC SHOP MORE LANC-GFTCD-REIMB 400.00 101 4431307 400.00 7427107 D3242 ZIMMER, DANIEL 06/22-SPORTS OFFICIALS 759.00 101 4641308 759.00 7427108 1215 L A CO WATERWORKS 04/19/22-06/22/22 WATER SVC 51,146.92 101 4631654 14,509.86 101 4634654 10,323.00
203 4636654 389.29
203 4636654 547.44
203 4636654 814.64
482 4636654 6,619.16
482 4636654 8,888.40
482 4636654 9,055.13
51,146.92 51,146.92
7427109 03312 ALCORN FENCE CO 4752 GR REMOVAL 61,580.00 203 4752460 5,280.00

Page 16 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 203 4752463 56,300.00
61,580.00 61,580.00
7427110 A7061 C A RASMUSSEN, INC CP21007-2020 FALL PVMNT MGMT 485,256.64 150 2100003 485,256.64 7427111 10485 LEGEND PUMP & WELL SERVICE INC LNSC-EMERGENCY WELL RPR INV#2 103,677.00 227 17GB001924 103,677.00 7427112 05934 SHI INTERNATIONAL CORP SOPHOS CENTRAL INTERCEPT 124,629.90 112 4315302 124,629.90 MACBOOK PRO 7,311.81 112 4315302 9.99
112 4315302 7,301.82
MAC BOOK PRO 14,931.05 112 4315302 14,931.05 146,872.76 146,872.76
7427113 00107 A V PRESS 06/30-PAC ADVERTISING 662.38 101 4650205 662.38 7427114 D2988 ALLISON, DEMING DA-EE#207032-FSA 2021 REIMB 397.75 101 4761121 397.75 7427115 C2555 CHARTER COMMUNICATIONS HOLDING06/27-07/26/22 TV/INTRNT/VOICE 540.82 101 4632301 540.82 7427116 C2555 CHARTER COMMUNICATIONS HOLDING06/22-INTERNET/TV/PHONE SVCS 2,303.49 101 4622682 807.85 101 4820651 164.99
112 4315651 1,330.65
2,303.49 2,303.49
7427117 10905 DORRIS, KIMBERLY KD-MLGE-NEW ORL-06/12-15/22 90.68 101 4220256 90.68 7427118 10918 EMPOWER PERMITTING RFND-PMT21-04348-43624 16TH E 91.80 101 3201104 (73.00) 101 3201104 (41.20)
101 3201104 206.00

91.80 91.80
7427119 D4379 FLORES, HECTOR J HF-BOOT/PANT REIMBURSEMENT 500.00 101 4635209 500.00 7427120 1215 L A CO WATERWORKS 05/03/22-07/06/22 WATER SVC 25,108.24 101 4620654 176.02 101 4631654 14,906.18
101 4633654 3,454.18
203 4636654 803.96
203 4752654 2,569.16
306 4342654 164.23
480 4755654 772.35
482 4636654 1,492.56
484 4755654 769.60
25,108.24 25,108.24
7427121 D2287 LANCASTER CODE ENFRCMNT ASSN UNION DUES-PP 14/2022 150.00 101 2171000 150.00 7427122 07633 NIEBLA, TROLIS TN-PR DM-SAN FRAN-07/14-15/22 118.50 101 4200201 118.50 7427123 A7221 P E R S LONG TERM CARE PROGRAM LONG TERM CARE PREM-PP 14/2022 645.84 101 2170200 645.84 7427124 A7221 P E R S LONG TERM CARE PROGRAM 07/22-RETIREE LONG TERM CARE 7,595.90 109 1101000 7,595.90

Page 17 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7427125 A7221 P E R S LONG TERM CARE PROGRAM 06/22-RETIREE LONG TERM CARE 7,740.15 109 1101000 7,740.15 7427126 C2554 SUPERIOR COURT OF CA-CO OF L A 06/22-ALLCTN OF PRKG PENALTIES 15,109.00 101 3310200 1,372.50 101 3310200 1,372.50
101 3310200 1,372.50
101 3310200 1,377.00
101 3310200 1,830.00
101 3310200 2,294.50
101 3310200 2,745.00
101 3310200 2,745.00
15,109.00 15,109.00
7427127 D3370 VERIZON WIRELESS 06/22-WIRELESS SVC 9,402.59 112 4315651 9,402.59 7427128 D1445 A V PARTNERS FOR HEALTH PROJECT CONTRACT SVCS-12TH ST 28.57 101 4622682 28.57 PROJECT CONTRACT SVCS 169.40 101 4622682 169.40 197.97 197.97
7427129 08979 A V PEST CONTROL PDW-PEST CONTROL SVC 75.00 101 4634301 75.00 LMS-PEST CONTROL SVC 275.00 101 4632301 275.00 PDW-PEST CONTROL SVC 75.00 101 4634301 75.00 425.00 425.00
7427130 06294 A V WEB DESIGNS NSC-07/22-MONTHLY HOSTING CHGS 99.95 112 4315302 99.95 7427131 03327 AARON GRAPHICS COLOR BOND(6) 262.33 101 4410254 262.33 7427132 05445 ADELMAN BROADCASTING, INC KGBB-FM-FRWRK SFTY/SUMMER EVNT 2,060.00 101 4100301 2,060.00 KRAJ-FM-FRWRK SFTY/SUMMER EVNT 1,880.00 101 4100301 1,880.00 KZIQ-FM-FRWRK SFTY/SUMMER EVNT 1,880.00 101 4100301 1,880.00 5,820.00 5,820.00
7427133 D0990 ADMIT ONE PRODUCTS FOD-QR CODED TICKETS 1,865.33 101 4649563 1,865.33 7427134 09972 AFFORDABLE HSG & DEV OF SOCAL ADVISORY SVCS 9,641.25 306 4240301 9,641.25 7427135 10191 ALERT NEIGHBORHOOD SECURITY JUL-SEP 22 CMMNTY HOUSES MNTR 945.00 101 4622682 945.00 7427136 C8962 ALTA LANGUAGE SERVICES, INC LISTENING/SPEAKING TEST 204.00 101 4220301 204.00 7427137 11125 ALVAREZ JR, EDUARDO RFND-PRKNG CTN-33022721/22405 78.00 101 3310200 78.00 7427138 D3147 AMERICAN PLUMBING SERVICES,INC CH-REPAIR WOMENS RESTROOM 435.00 101 4633402 435.00 7427139 02693 ANDY GUMP, INC OMP-FENCE RNTL-07/04-31/22 44.98 101 4634602 44.98 7427140 C9805 ARROW TRANSIT MIX INC READY MIX CONCRETE 577.61 203 4752410 577.61 READY MIX CONCRETE 998.21 203 4752410 998.21 1,575.82 1,575.82
7427141 06738 ASPEN ENVIRONMENTAL GROUP 03/22-04/22-PROFESSIONAL SVCS 14,292.19 101 2185721 14,292.19

Page 18 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7427142 11100 CI SECURITY 06/22-INCIDENT ASSISTANCE SVC 11,437.50 112 4315302 11,437.50 7427143 D1545 CLETEHOUSE CAFE, INC AHP-CTRNG SVC-07/05/22 571.90 101 4601251 571.90 7427144 10674 COMMUNITIES FOR CHRIST GRACEFEST SPONSORSHIP 10,000.00 101 4100205 10,000.00 7427145 06385 CRIME POINT INC ILLEGAL DUMPNG SRVLNCE CAMERAS 14,579.55 101 4754355 112.49 101 4754355 7,177.28
203 4752501 112.50
203 4752501 7,177.28
14,579.55 14,579.55
7427146 10563 DEBRA SCACCO STUDIO WATER GOLD SOIL WALKTHROUGH 300.00 101 4653251 300.00 7427147 00414 DESERT LOCK COMPANY LBP-SUITE HE REPAIR 90.00 101 4633403 90.00 7427148 11049 EVERNOTE CORPORATION EVRNTE-TMS SBSCRPTN 7/22-07/23 3,749.75 112 4315302 3,749.75 7427149 D3240 FASTENAL COMPANY PW-JANITORIAL SUPPLIES 986.84 203 4752406 768.57 203 4752410 218.27
986.84 986.84
7427150 00617 FEDERAL EXPRESS CORPORATION EXPRESS MAILINGS 62.05 101 4205251 62.05 EXPRESS MAILINGS 34.62 101 4761212 34.62

96.67 96.67
7427151 07124 FIRST AMERICAN DATA TREE, LLC 06/22-PROFESSIONAL SERVICES 400.00 101 4230301 400.00 7427152 08245 GOLDEN STATE LABOR COMPLIANCE FB-729-20 2022 CH RENO/ MODERN 2,596.28 701 11BS019924 2,596.28 PWCP 21-010 2021 FALL PMP 3,825.59 701 12ST045924 3,825.59 PWCP 21-014 PED CAP PAV CLS IM 3,988.29 210 15SW016924 3,988.29 PWCP 21-024 SKYTOWER PARK RENO 1,838.39 701 11BS034924 1,838.39 PWCP 22-004 2022 SMR PAV MNG 4,322.55 701 12ST048924 4,322.55 16,571.10 16,571.10
7427153 10888 GONZALEZ PROPERTY SVCS RDP-GAZEBO REPAIR 490.00 101 4630460 490.00 LMS-IRRIGATION REPAIR 985.00 101 4632402 985.00 RDP-GRAFFITI REMOVAL 985.00 101 4630460 985.00 2,460.00 2,460.00
7427154 10280 GRADY COMMUNICATIONS, LLC BIKE RAFFLE FLYER/POSTER 325.00 101 4771301 325.00 TOUR DE LUKE FLYER 750.00 101 4771301 750.00 1,075.00 1,075.00
7427155 05822 H & H AUTO PARTS WHOLESALE FILTERS/SEALS/PNL AIR ELEMENT 1,063.56 111 4753214 1,063.56 7427156 07653 INBOUND DESIGN INC 06/22-WEB DESIGN/MAINTENANCE 325.00 490 4250301 325.00 7427157 10778 INFINITY TECHNOLOGIES 06/22-GIS SUPPORT 17,752.50 112 4315302 17,752.50 06/22-GIS SUPPORT 9,530.00 112 4315302 2,300.00 112 4315302 7,230.00

Page 19 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 27,282.50 27,282.50
7427158 D3842 INNOVATION EDUCATION CC-SMMR CAMP-MORNING ACDMCS 10,000.00 101 4600301 10,000.00 7427159 A8656 KIMLEY-HORN & ASSOCIATES INC AVE M PS&E 28,295.00 210 15BR005924 28,295.00 AVE M PS&E 960.00 210 15BR005924 960.00 AVE L PA & ED 12,318.75 203 4752207 12,318.75 AVE L PA & ED 2,103.75 203 4752207 2,103.75 LANCASTER LRSP 3,251.09 101 4771301 325.11 349 4771301 2,925.98
46,928.59 46,928.59
7427160 1232 L A CO AUDITOR CONTROLLER FY22/23-LAFCO CHARGES 5,408.38 101 4200206 5,408.38 7427161 D2426 L A CO DEPT OF PUBLIC HEALTH JUNETEENTH-PROCESSOR FEES 2,247.50 101 4200251 2,247.50 7427162 10609 LDM ASSOCIATES INC 05/22-HOME ARP SVCS 474.75 306 4792301 474.75 7427163 10643 LOGICALIS INC 06/22-VIRTUAL IT SVC TICKETS 7,290.00 112 4315302 7,290.00 7427164 10283 LSY ENTERPRISE INC 02/22 ON-CALL TRAFFIC ENG SVCS 1,600.00 101 4771301 1,600.00 7427165 02270 MELDON GLASS CH-LCM ARM INSTLL 90.00 101 4633403 90.00 7427166 D3578 MINUTEMAN PRESS LCE-2022 JRC MAILER(13716) 8,055.17 490 4250213 8,055.17 7427167 1360 MIRACLE RECREATION EQUIPMENT RDP-PLAYGROUND EQPMNT 986.34 101 4634404 986.34 7427168 D2634 O'REAR, JEFFREY R 07/22-PRODUCTION SERVICES 400.00 101 4649225 400.00 7427169 10392 PEI ADVANCED ENGINEERING SVC 875.00 112 4315302 875.00 7427170 10870 PEREZ, ELENA FIGURE MODEL 100.00 101 4651251 100.00 7427171 1612 PETRO LOCK UNLEADED(5411)/DIESEL(2181) 38,136.26 111 4753217 38,136.26 7427172 C4167 RELIABLE ENERGY RFND-PMT22-1362-45709 BLMRL CT 27.80 101 3201106 (73.00) 101 3201106 (25.20)
101 3201106 8.00
101 3201106 30.00
101 3201106 88.00

27.80 27.80
7427173 05934 SHI INTERNATIONAL CORP IT-WORKSPACE ONE(100) 4,084.00 112 4315302 4,084.00 7427174 C5833 SO CA ASSOC OF GOVERNMENTS FY 22/23-DUES ASSESSMENT 18,178.00 101 4200206 18,178.00 7427175 06429 STANTEC CONSULTING SRVCS INC CP23010-SIERRA HWY RESURFCNG 4,357.00 701 12ST042924 4,357.00 7427176 10654 THE LIFEGUARD STORE AQTCS EQUIP-RESCUE TUBE/KEMP 856.30 101 4642251 856.30 7427177 C5522 THOMSON REUTERS-WEST PMT CENTR06/22-ONLINE SFTWR SBSCRPTN 921.34 101 4230301 921.34

Page 20 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 7427178 2003 TIP TOP ARBORISTS, INC 44381 STANDRIDGE-TREE RMVL 6,850.00 101 4622682 6,850.00 7427179 08319 TRIPEPI SMITH & ASSOCIATES INC 06/22-GENERAL ACCOUNT SUPPORT 1,560.00 101 4771301 1,560.00 7427180 02977 TURBO DATA SYSTEMS INC 05/22-ADMIN CITATIONS 7,780.11 101 4245301 7,780.11 06/22-ADMIN CITATIONS 709.33 101 4245301 709.33 8,489.44 8,489.44
7427181 A7515 U S BANK 05/22-ADMIN FEE 250.00 101 3501110 250.00 7427182 D4202 U S BANK ADMIN FEES-06/01/22-05/31/23 LANC RDVLPMNT-SCHL DIST PSS-TH 1,800.00 991 4240962 1,800.00 ADMIN FEES-06/01/22-05/31/23 LANC RDVLPMNT-NON HSNG PRGRM 1,800.00 991 4240962 1,800.00 3,600.00 3,600.00
7427183 31009 UNIVERSAL ELECTRONIC ALARMS MNTC YD MONTH-MONIT-FIRE ALARM 27.00 203 4752301 27.00 MNTC YD MONTH-MONIT-SEC ALARM 27.00 203 4752301 27.00

54.00 54.00
7427184 D3370 VERIZON WIRELESS 06/22-IPAD SVC 6,356.18 112 4315651 6,356.18 7427185 07922 VILLANI, TERI CS-PERF-MUSIC-07/14/22 500.00 101 4649225 500.00 7427186 04496 VULCAN MATERIAL WESTERN DIV ASPHALT 119.91 203 4752410 119.91 ASPHALT 127.53 203 4752410 127.53
COLD MIX 162.68 203 4752410 162.68
ASPHALT 112.79 203 4752410 112.79
522.91 522.91
7427187 C2562 WESTERN PACIFIC ROOFING CORP ROOF REPAIRS-43028 GUYMAN AVE 2,900.00 101 4622682 2,900.00 7427188 09201 XEROX FINANCIAL SERVICES LLC EQUIPMENT MOVEMENT 300.00 101 4410254 300.00 7427189 11038 YOU WRECK IT FRANK FIX IT 44381 STANRIDGE-LIGHT INSTL 1,223.78 101 4622682 1,223.78 422 E LANDSFORD ST-LIGHT INSTL 1,223.78 101 4622682 1,223.78 2,447.56 2,447.56
7427190 2501 ZUMAR INDUSTRIES, INC MTNC YD-DOUBLE/COMBO ARROW 1,229.66 203 4754455 1,229.66 7427191 06099 A V RECYCLING CENTER HOMELESS ENCAMPMENT CLEANUP 30,000.00 101 4800301 30,000.00 06/22 CLEAN UP & VEG REMV 44,400.00 203 4752301 44,400.00 74,400.00 74,400.00
7427192 06225 CPACINC.COM BARRACUDA EML PRTCN SBSCRP 3YR 117,910.00 112 4315302 117,910.00 7427193 07916 PARRON HALL CORPORATION CH-RENOVATIONS-FURNITURE PHS 1 73,867.50 701 11BS019924 73,867.50 7427194 10219 REDMAN CONSULTING 05/2-06/22-GRANT WRITING SVS 49,920.00 101 4771301 49,920.00 PROF SVCS-SAFE RTS TO SCHOOL 12,792.50 101 4771301 12,792.50 62,712.50 62,712.50
7427195 A6479 TAFT ELECTRIC COMPANY PW-ELECTRICAL SVCS-06/06/22 2,448.46 203 4754460 2,448.46

Page 21 of 22 ends

City of Lancaster Check Register
From Check No.: 7426860 - To Check No.: 7427196
Printed: 7/18/2022 15:51 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount PW-ELECTRICAL SVCS-06/07/22 3,174.08 203 4754460 3,174.08 PW-ELECTRICAL SVCS-06/25/22 1,371.68 483 4754660 1,371.68 05/22-06/22-ELECTRICAL SVCS 72,860.05 483 4754301 72,860.05 79,854.27 79,854.27
7427196 09665 TERRACARE ASSOCIATES, LLC 05/22-LMD MAINTENANCE 58,398.71 482 4636402 58,398.71 05/22-BP-MONTHLY MAINTENANCE 3,266.05 482 4636401 3,266.05 61,664.76 61,664.76
Chk Count 337 Check Report Total 6,454,926.82

Page 22 of 22 ends

City of Lancaster Check Register
From Check No.: 101011037 - To Check No.: 101011040
Printed: 7/18/2022 15:49 From Check Date: 06/26/22 - To Check Date: 07/16/22 Check No Supplier Supplier Name Invoice Description Invoice Amt Charge Code GL Amount 101011037 05987 THE VISITORS BUREAU-LANCASTER 04/22-TBID FEE 72,678.85 101 2501000 72,678.85 101011038 09509 ADP, LLC ADP FEES-PE 05/21/22 863.44 101 4220301 863.44 ADP FEES-PE 05/31/22 37.76 101 4220301 37.76 901.20 901.20
101011039 09509 ADP, LLC ADP FEES-PE 06/04/22 654.55 101 4220301 654.55 101011040 09509 ADP, LLC ADP FEES-PE 05/31/22 20.00 101 4220301 20.00 ADP FEES-MNGMNT STE-PE 6/13/22 5,810.25 101 4220301 5,810.25 ADP FEES-RVRS WIRE-PE 05/31/22 20.00 101 4220301 20.00 5,850.25 5,850.25
Chk Count 4 Check Report Total 80,084.85

Page 1 of 1 ends

STAFF REPORT
City of Lancaster
Date: August 09, 2022
To: Mayor Parris and City Council Members
From: George N. Harris II, Finance Director
Subject:Monthly Report of Investments – June 2022
Recommendation:

Accept and approve the June 2022 Monthly Report of Investments as submitted.

Fiscal Impact:

None
Background:

Each month, the Finance Department prepares a report listing the investments for all separate entities under the jurisdiction of the City as identified in the City’s Comprehensive Annual Financial Report.

Portfolio Recap
Yield:

June 2022 May 2022
Total Portfolio 0.89% 0.85%
Local Agency Investment Fund 0.86% 0.68%
Total Portfolio Balance: $142,407,641 $113,255,891 The portfolio balance increased from May to June by $29,151,750 or 25.74%. Significant revenues for June included $18,170,281 Federal 2021 ARPA Funds, $13,592,788 Property Taxes, $2,360,629 Sales & Use Tax, and $1,811,432 Measure LC Sales Tax. The largest City expenditures were $3,921,278 Payroll & Benefits and $1,232,400 Capital Projects.

The City’s temporary idle cash, those funds not immediately needed to pay current bills and not governed by bond indentures or bond resolutions, is invested by the City’s adopted Investment Policy. This policy is reviewed regularly by the City Council, with the latest policy adopted on February 13, 2018, by Resolution No. 18-06.

CC 4
08/09/22
JC
9 9
9 The City's cash management system is designed to accurately monitor and forecast expenditures and revenues, thus enabling the City to invest funds to the fullest extent possible within the guidelines of this Investment Policy. The City attempts to achieve the highest yield obtainable through a diversified portfolio only after meeting the criteria established for safety and liquidity in that order. The principal investment objectives of the City are:

1. Preservation of capital and protection of investment principal;

2. Maintenance of sufficient liquidity to meet anticipated cash flows;

3. Attainment of a market rate of return;

4. Diversification to avoid incurring unreasonable market risks, and;

5. Compliance with the City’s Municipal Code and with all applicable City resolutions, California statutes, and Federal regulations.

The City’s portfolio is a short-term and intermediate-term fixed-income portfolio. The maximum maturity of any investment is 5 years, with consideration of anticipated cash flow requirements and known future liabilities. The City contracts with an investment advisory service (Insight Investment) to assist in the effort to maximize the returns of the City portfolio. The City’s investments include publicly-traded Treasury notes, Treasury Bills, Federal Agency Investments, Time Deposits, and Local Agency Investment Fund (LAIF) under the auspices of the State Treasurer for investment. Funds invested in LAIF are available within 24 hours, and other investments are available upon maturity at full face value. These investments enable the City to meet its expenditure requirements for the next six months, as required by state law.

The City’s investment procedures are governed by Sections 53600 et. seq. of the California Government Code. Additional requirements have been placed on the City’s authorized investments by the Investment Policy (a copy is available in the Finance Department or from the City Clerk), and all investments listed on the attached report adhere to these requirements.

GH: ma
Attachment:

Monthly Report of Investments
Interest Rate Amount Total
City of Lancaster
Wells Fargo Bank $42,738,686
City of Lancaster Account 0.00% $42,738,686
U S Bank - Safekeeping $42,238,898
US Treasury Notes 1.89% $18,481,214
Federal Government Agencies 1.46% $11,881,587
Corporate Securities 2.86% $7,081,416
Municipal/Provincial Bonds 1.09% $4,777,997
Cash & Equivalents 0.00% $16,684
Chase Bank $150,980
Certificate of Deposit 0.01% $150,980
Local Agency Investment Fund (L.A.I.F.) 0.86% $46,881,975 $46,881,975 Successor Agency for the Lancaster Redevelopment Agency Local Agency Investment Fund (L.A.I.F.) 0.86% $10,397,102 $10,397,102 Total Pooled Portfolio $142,407,641
Weighted Average 0.89%
Interest Rate Amount Total
River City Bank $6,101,791
Lancaster Choice Energy LockBox Account 0.00% $5,524,511 CCEA Operating Account 0.00% $577,280
The Bank of New York Mellon Trust Company, N.A. $1,483,822 LRA & LA County Escrow Account - Government Bonds 0.00% $1,483,822 US Bank $60,707,272
LRA Combined 2004 Fire Protection Facilities Project Bonds 1.26% $827,845 LRA Combined 2004 Sheriff Facilities Prjct Refunding Bonds 1.26% $1,816,717 LPA Solar Renewable Energy Issue of 2021 0.00% $1
SA Combined Project Areas Refunding Bonds 2015A & B 1.26% $13 SA Combined Project Areas Refunding Bonds 2016 A-1 & A-2 1.26% $15 SA Combined Project Areas Refunding Bonds 2016B 1.26% $6 LFA 2016 Assessment Revenue Bonds (Streetlights Acquisition) 1.26% $1 LFA LRB 2018 Construction and Improvements 1.26% $2,395,996 LFA 2018 Lease Revenue Bonds 1.26% $38
LFA LRB 2019 Street Improvements 1.26% $55,666,641
Total Restricted Cash/Investments Held in Trust $60,707,272 Total Restricted Cash/Investments Held in Trust (note 4) $68,292,885 All investments are authorized pursuant to and consistent with the investment policy of the City of Lancaster. Policy adopted 02/13/18 under resolution number 18-06.

George N. Harris II
Finance Director

ATTACHMENT A

CITY OF LANCASTER

MONTHLY REPORT OF INVESTMENTS
30-Jun-22
City of Lancaster
Cash Balances by Fund
June 30, 2022
Fund No. Fund Name Ending Balance Fund No. Fund Name Ending Balance 101 GENERAL FUND 70,616,203 $ 323 STATE GRANT - STPL (26,890) $ 104 CAPITAL REPLACEMENT FUND 94,351 $ 324 STATE GRANT - OTS 42,648 $ 106 COMMUNITY SERVICES FOUNDATION 119,589 $ 330 STATE GRANT RECYCLING 390,681 $ 109 CITY SPECIAL RESERVES FUND 16,907,769 $ 331 STATE GRANT - OIL RECYCLING 20,232 $ 111 FLEET INTERNAL SERVICE FUND 235,723 $ 349 MISC STATE GRANTS (407,113) $ 112 IT INTERNAL SERVICE FUND (341,588) $ 361 CDBG (351,740) $ 113 GEN LIAB INTERNAL SERVICE FUND 2,913,640 $ 363 NBRHD STABILIZATION PRGM 2,635,954 $ 139 FIXED ASSETS ACOUNT GROUP (4,451,605) $ 364 HPRP-HOMELESS PREV & RAPID REH - $ 150 CAPITAL PROJECTS FUND - CITY (631,090) $ 391 LANCASTER HOME PROGRAM 1,121,283 $ 203 GAS TAX (1,894,071) $ 399 FEDERAL MISCELLANEOUS GRANTS (124,455) $ 204 AQMD (64,031) $ 401 AGENCY FUND 65,771 $ 205 PROP 1B 5,985 $ 402 PERFORMING ARTS CENTER - $ 206 TDA ARTICLE 8 FUND (1,402,605) $ 404 GRANTS FUND - $ 207 PROP "A" TRANSIT FUND 5,223,347 $ 408 X-AEROSPACE GRANTS FUND - $ 208 TDA ARTICLE 3 BIKEWAY FUND (7,618) $ 456 STILL MEADOW LN SWR ASSMNT DST 24,032 $ 209 PROPOSITION "C" FUND 8,325,798 $ 480 SEWER MAINT FUND 4,843,648 $ 210 MEASURE R FUND 1,694,335 $ 482 LANDSCAPE MAINTENANCE DISTRICT 1,336,001 $ 211 MEASURE M FUND 2,088,508 $ 483 LIGHTING MAINTENANCE DISTRICT 4,884,779 $ 212 MEASURE A FUND (129,188) $ 484 DRAINAGE MAINTENANCE DISTRICT 2,219,459 $ 213 PARKS DEVELOPMENT FUND 915,943 $ 485 RECYCLED WATER FUND 30,478 $ 217 SIGNALS - DEVELOPER FEES FUND 2,730,543 $ 486 LANCASTER POWER AUTHORITY 3,997,827 $ 220 DRAINAGE - DEVELOPER FEES FUND 10,381,027$ 490 LANCASTER CHOICE ENERGY (2,245,547) $ 224 BIOLOGICAL IMPACT FEE FUND 827,651 $ 491 CALIFORNIA CHOICE ENERGY AUTH 89,751 $ 226 USP - OPERATION 2,487 $ 701 LANCASTER FINANCING AUTHORITY (33,387,844) $ 227 USP - PARKS 2,154,468 $ 810 ASSESSMENT DISTRICT FUND 154,596 $ 228 USP - ADMIN 70,111 $ 811 AD 93-3 - $
229 USP - CORP YARD 196,705 $ 812 AD 92-101 202 $ 230 MARIPOSA LILY FUND 62,733 $ 830 CFD 89-1 EASTSIDE WATER FUND 23,537 $ 232 TRAFFIC IMPACT FEES FUND 1,449,593 $ 831 CFD 90-1 (BELLE TIERRA) (207) $ 233 DEVELOPER IN LIEU 106,700 $ 832 CFD 91-1 (QUARTZ HILL) 13,201 $ 248 TRAFFIC SAFETY FUND 298,729 $ 833 CFD 91-2 (LANC BUSINESS PARK) - $ 251 ENGINEERING FEES 219 $ 991 REDEV OBLIGATION RETIREMENT FD 22,818,581 $ 252 PROP 42 CONGESTION MANAGEMENT 46,543 $ 992 DEBT SERVICE - SUCCESSOR AGENCY 11,308,034 $ 261 LOS ANGELES COUNTY REIMB 240,864 $ 993 DEBT SERVICE - COUNTY 1,247,563 $ 301 LANCASTER HOUSING AUTH. OPS. 1,862,660 $ 994 DEBT SERVICE - COUNTY ( 12,555,597)$ 306 LOW & MOD INCOME HOUSING 9,898,037 $ 996 SCHOOLS SUBORDINATE P/T FUND 30 $ 321 MTA GRANT - LOCAL 1,008,441 $ Total Cash Balance 139,725,802 $ Historical Cost Amortized Cost Fair Value
Unrealized Gain
(Loss)
Weighted
Average
% Portfolio/
Segment
Weighted
Average Market
Cash and Equivalents $100,185,428 $100,185,428 $100,185,428 $0 1 70.35% 0.00 Corporate Bonds $7,081,416 $6,899,594 $6,611,900 ($287,694) 630 4.97% 1.63 Government Agencies $11,881,587 $11,700,240 $11,265,881 ($434,358) 606 8.34% 1.59 Government Bonds $18,481,214 $18,321,333 $18,051,087 ($270,247) 403 12.98% 1.07 Municipal/Provincial Bond s $4,777,997 $4,748,468 $4,600,439 ($148,029) 460 3.36% 1.24 $142,407,641 $141,855,063 $140,714,734 ($1,140,329) 504 100.00% 1.33 Recap of Securities Held
June 30, 2022
City of Lancaster

70.35%4.97%

8.34%

12.98% 3.36%
Portfolio Diversification
Cash and Equivalents
Corporate Bonds
Government Agencies
Government Bonds
Municipal/Provincial Bonds
City of Lancaster
Maturity Distribution
June 30, 2022
Maturity Historical Cost Percent
Under 90 Days $103,644,541 72.78%
90 to 179 Days 90 180 $6,378,570 4.48%
180 Days to 1 Year 180 365 $6,535,640 4.59%
1 to 2 Years 365 730 $13,941,821 9.79%
2 to 3 Years 730 1095 $10,141,542 7.12%
3 to 4 Years 1095 1460 $1,765,527 1.24%
4 to 5 Years 1460 1825 $0 0.00%
Over 5 Years $0 0.00%
$142,407,641 100.00%
$0
$20
$40
$60
$80
$100
$120
Under 90 Days 90 to 179
Days
180 Days to 1
Year
1 to 2 Years 2 to 3 Years 3 to 4 Years 4 to 5 Years Over 5 Years Historical Cost
(Millions) Maturity Distribution

ATTACHMENT A

CITY OF LANCASTER

MONTHLY REPORT OF INVESTMENTS
August 09, 2022
(1) This is the actual City bank account balance as of 6/30/2022. It only reflects checks that have been presented for payment and deposits received by the bank. The balance on deposit per the City books would reflect reductions for all checks and warrants issued and all deposits transmitted.
(2) This is the safekeeping account utilized for investing City funds pursuant to and consistent with the investment policy adopted 02/13/2018. The current portfolio consists of treasury notes, government agencies, corporates, and CDs. (3) Pooled Portfolio:

% of Portfolio Policy Limit
Cash 30.02% None
CDs 0.11% 25% of total portfolio
Commercial Paper 0.00% 25% of total portfolio
US Treasury 12.98% None
Federal Securities 8.34% None
Corporate Securities 4.97% 30% of total portfolio
Municipal/Provincial 3.36% None
LAIF 40.22% None

(4) These are restricted cash and investments are held in trust by the banks indicated.

These amounts cannot be pooled for other investing.

STAFF REPORT
City of Lancaster
CC 5
8/9/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: Sonya Patterson, Director – Parks, Arts, Recreation & Community Services Subject: Lancaster National Soccer Center Emergency Well Pump Replacement Recommendation:

1. Per the Public Contract Code 22035 & 22050 Emergency Contracting Procedures, accept update on the Lancaster National Soccer Center Emergency Well Pump Replacement.

Fiscal Impact:

No new fiscal impact. On May 24, 2022 Council authorized $166,597.20 (including 20% contingency) to be awarded for the emergency repair.

Background:

The Lancaster National Soccer Center was opened to the public in 1995. LNSC is home to 35 soccer fields and 29 practice fields. These fields are used daily for local recreational league soccer practice, and on weekends for recreational and regional soccer tournaments. It is currently one of the largest recreational soccer facilities in Los Angeles County.

LNSC is irrigated by an onsite well, which is powered by a 150 Horse Power Pump. This pump stopped working on April 26, 2022. Immediately, Legend Pump & Well Service, Inc., was called out for emergency service and inspection. Inspection work was performed (which costs are included in this authorization), and it was determined the well pump needs to be replaced. A quote for replacement parts and installation was provided by Legends Pump & Well Service, Inc. The quote exceeds the amount specified in Section 22032(b) of the California Public Contract Code, which would require the contract to be bid by Informal Bidding Procedure. This procedure would extend award 4-6 weeks.

The repair of the well pump is of the essence to preserve the turf. The well pumps approximately 1,000 gallons of water per minute, whereas the back up well only pumps approximately 400-500 gallons per minute. As we enter into the warmer months, time is of essence, as a delay of 4-6 weeks for bidding, could result in the loss of over half a million dollars of athletic turf due to lack of 9 9
2 adequate water. Additionally, there are several regional soccer tournaments scheduled this summer, in addition to local league use. If the turf needs to be removed and replaced, the fields will be unusable for 2-3 months, resulting in lost revenue for tournaments, leagues, and City tourism dollars.

On May 24, 2022 City Council took the following actions:

1. Adopted Resolution No. 22-20 finding that an emergency exists and authorized the emergency repair of the well pump at the LNSC.

2. Authorized the use of Emergency Contracting Procedures per Public Contract Code 22035 & 22050.

3. Authorized award of contract for Emergency Well Pump Replacement, to Legend Pump & Well Service, Inc., of San Bernardino, CA in the amount of $138,831 plus a 20% contingency, to remove and replace the well pump currently providing water to irrigate the Lancaster National Soccer Center.

4. Authorized the City Manager, or his designee, to sign all documents associated with these repairs.

Upon council action, staff issued a Notice to Proceed to Legend Pump & Well Service on May 25, 2022. The purchase requisition was submitted on May 26, 2022. Equipment and materials were received and the well rehab work commenced on June 20, 2022. Installation of the new equipment began the week of July 5, 2022. The major repairs are complete and watering of the field has fully resumed. The vendor is awaiting receipt of a check valve and gate valve equipment for installation, which will complete the repair project.

Attachment:

STAFF REPORT
City of Lancaster
CC 6
8/9/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: Sonya Patterson, Director – Parks, Arts, Recreation & Community Services Subject: Amend Operating Agreement for the Management of Zelda’s 750 West and Lancaster Performing Arts Center East End Concessions
Recommendation:

1. Approve Amendment to the Agreement for the Management of Zelda’s 750 West and Lancaster Performing Arts Center East End Concessions to decrease insurance coverage requirement.

2. Authorize City Manager or designee to execute contract amendment.

Fiscal Impact:

No Fiscal Impact
Background:

On December 14, 2021 City Council awarded the operating agreement for the management of Zelda’s 750 West and Lancaster Performing Arts Center East End Concessions through Solicitation for Offers 744-22O to Fusion Food Concepts (Operator). The agreement requires the operator to carry umbrella or excess liability coverage with a limit of not less than Ten Million Dollars ($10,000,000). The operator has met this obligation. However, due to the cost of the insurance policy, the vendor is requesting to amend the contract to require umbrella or excess liability coverage with a limit of not less than Five Million Dollars ($5,000,000). The vendor has been successfully operating since January 1, 2022 with no issues or concerns, therefore staff recommends the request to reduce the insurance requirement be approved.

Attachment:

Zelda’s SFO 744-22 Operating Agreement Amendment No. 1

STAFF REPORT
City of Lancaster
CC 7
8/9/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: Sonya Patterson, Director of Parks, Arts, Recreation & Community Services Subject:Approve Amendment No. 1 and No. 2 for RFP No. 710-19 Landscape Maintenance Services Agreement with Terracare, Inc (PARKS) Recommendation:
a. Approve Amendment No. 1 for RFP No. 710-19 Landscape Maintenance Services Agreement with Terracare, Inc which increased the NTE (not to exceed) amount from $435,193 to $551,387.52.
b. Approve Amendment No. 2 for RFP No. 710-19 with Terracare Associates, of Littleton, CO, a one-year extension for professional landscape maintenance services, for an estimated amount not to exceed $569,869.
c. Authorize the City Manager, or his designee, to sign all documents.

Fiscal Impact:

Funding was available in FY22 budgets (101-4631-402, 101-4632-402, 101-4634-402, 101- 4635-402, 101-4620-402, 101-4622-301) and in FY23 budgets (101-4631-402, 101-4632-402, 101-4633-402, 101-4634-402, 101-4635-402, 101-4620-402, 101-4622-301, 101-4636-402, 207- 4633-404, 207-4634-402).

Background:

In July 2019, Terracare Associates was awarded the contract for Parks Maintenance Services through Request for Proposal No. 710-19. Terracare Associates began to service this contract effective September 1, 2019 through their Lancaster-based facility, which employs 20 Lancaster residents. Services covered under this agreement include, but are not limited to, mowing, edging, aerating, pruning, fertilizing, weed abatement and pest control to provide maintenance of landscaping for all City parks, the Lancaster Municipal Stadium, the Lancaster National Soccer Center, and other Facilities across the City. Amendment No. 1 increases the not to exceed amount of the contract due to COLA increases and inclusion of additional city-owned facilities, as outlined 9 9
4 in Amendment No. 1. Amendment No. 2 will extend the contract by one (1) year, effective September 1, 2022, includes a COLA increase, as well as adds additional City-owned facilities, as outlined in Amendment No. 2.

SP:RG:jp
Attachments:

Terracare RFP No. 710-19 Agreement Amendment No. 1 ~ 2022 Terracare RFP No. 710-19 Agreement Amendment No. 2 ~ 2022 Terracare RFP No. 710-19 Agreement ~ 2019

STAFF REPORT
City of Lancaster
CC 8
8/9/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: Jeff Hogan, Senior Director - Development Services Sonya Patterson, Director – Parks, Arts, Recreation and Community Services Subject: Approval of Amendment No. 1 for RFP No. 705-19 Landscape Maintenance Services Agreement with Terracare, Inc.

Recommendations:

1. Approve Amendment No. 1 for RFP No. 705-19 Landscape Maintenance Services Agreement with Terracare, Inc., which increases the not-to-exceed contract amount from $863,852.00 to $951,565.85 with a 10% contingency for additional work as needed.

2. Authorize the City Manager, or his designee, to sign all documents.

Fiscal Impact:
$951,565.85 (with a 10% contingency for additional work as needed) funding was available in FY 21-22 (203-4636-267, 482-4636-401, 482-4636-402), and is available in FY 22-23 budget (203- 4756-267, 482-4756-401, 482-4756-402).

Background:

The City of Lancaster maintains more than 6,360,000 square feet of developed landscaping.

Services covered under this proposal include, but are not limited to, mowing, edging, pruning, fertilizing, weed abatement, irrigation system monitoring and pest control to provide maintenance of all landscaping located in right-of-ways, bike paths, freeway on/off ramp areas, landscape maintenance districts, and main thoroughfares in the City.

A request for proposal was issued and on April 17, 2019, bids were received from five (5) firms, and four (4) were determined to be complete and qualified. A committee comprised of staff from Finance, Development Services and Parks, Arts, Recreation and Community Services Departments received the bid submittals. Based on evaluation measures identified in the Request for Proposal (RFP), which included: pricing, experience performing services of similar size and scope, qualifications of staff, references, and local preference, Terracare, Inc., was determined to 9 9
7 be the contractor who could provide the best product for the best prices. Terracare, Inc., currently has several offices in southern California and will use this opportunity to expand into the Antelope Valley. In addition, they plan to open a small office in Lancaster and hire local residents to fulfill this contract.

NJ/sm
Attachment:

RFP No. 705-19 Landscape Maintenance Services Agreement_Amendment No. 1 ~2022 AMENDMENT NO. 1 TO LANDSCAPE MAINTENANCE SERVICES
This Amendment (“Amendment No. 1”) is hereby entered into effective August 9, 2022 by and between the City of Lancaster, a Municipal Corporation, in the State of California, and TERRACARE ASSOCIATES. (CONTRACTOR) with respect to Agreement for Services between the parties dated September 1, 2019 (“Agreement”).

The Parties agree as follows:

1. " Payment Clause," attached hereto as Exhibit "A".

2. All other terms and provisions of the Agreement and subsequent amendments are hereby reaffirmed.

CITY OF LANCASTER CONTRACTOR

TERRACARE ASSOCIATES
______________________ ______________________
Jason Caudle, City Manager Brian Helgoe, CEO
ATTEST:

City Clerk
APPROVED AS TO FORM:

City Attorney
CONTRACT SUBMISSION APPROVAL:

Department Head
Department Head
EXHIBIT "A"
Effective August 9, 2022

PAYMENT CLAUSE
Payment.
2019-
2020 Contract Year Starting Amount $863,852.00
Additional Areas* $1,127.28
2020-
2021 Contract Year Starting Amount $864,979.28
Add 5% COLA-7 months only $3,604.08
$25,228.56
Updated Amount $890,207.84
Additional Areas* $6,616.32
2021-
2022 Contract Year Starting Amount $896,824.16
Add 5% COLA $44,841.21
Updated Amount $941,665.37
Additional Areas* $9,900.48
Final Total for Amendment $951,565.85
*See next page
The City of Lancaster shall reimburse the CONTRACTOR for actual costs, including labor costs and employee benefits incurred by the CONTRACTOR in performance of the work, in an amount not to exceed $951,565.85 with a 10% contingency for additional work as needed.

Actual costs shall not exceed the estimated wage rates and other costs as set forth in this Agreement. Source documentation supporting billed costs must be submitted with invoice.

CONTRACTOR shall provide a cost breakdown with hourly rates for each office and field function in the event that additional work is required beyond the not to exceed fee specified above. Any additional work will require a separate Authorization for CONTRACTOR Services signed by both parties.
2019-2020 2020-2021 2021-2022
3/1/2020 III Lancaster BLVD and 20th East 20,627 $0.0074 $152.64 $915.84 $1,831.68 $1,831.68 5/1/2020 III Avenue I and 10th West 7,143 $0.0074 $52.86 $211.44 $634.32 $634.32 10/1/2020 III Avenue J and 65th West 40,856 $0.0074 $302.33 $3,325.63 $3,627.96 11/1/2020 III 43843 Division St 3,455 $0.0074 $25.57 $255.70 $306.84 11/16/2020 III Avenue K and 27th West (SW Corner) 1,275 $0.0074 $9.44 $89.68 $113.28 6/1/2021 III 10th West, Avenue H to H6 21,590 $0.0074 $159.77 $479.31 $1,917.24 5/2/2022 II Avenue J between 15th and 20th West 20,123 $0.0130 $261.60 $1,046.40 5/2/2022 II 20th West between Home Depot and Avenue J 8,130 $0.0130 $105.69 $422.76 TOTALS $1,127.28 $6,616.32 $9,900.48
Contract Year Increase Amount
Start Date
Landscape Maintenance Additional Areas Added to Contract Category Location
Sq.

Feet
Unit
Cost
Monthly
Cost

44933 Fern Avenue  Lancaster, CA 93534  661.723.6000 www.cityoflancasterca.org
R. Rex Parris
Marvin E. Crist
Ken Mann
Raj Malhi
Darrell Dorris

Jason Caudle

Mayor
Vice Mayor
Council Member
Council Member
Council Member

City Manager

February 19, 2020

Mr. Matt Rogers, Manager
Terracare Associates
1250 Ames Avenue
Milpitas, California 95035

Re: Additions to the Landscape Maintenance Services Agreement

Dear Mr. Rogers:

Please add the following location to your schedule for maintenance:

CATEGORY LOCATION TRACT ROUTE (SQ. FT.) UNIT COST MONTHLY COST III Lancaster Blvd. & 20th East 54025 20,627 .0074 $152.64

Maintenance shall commence on March 1, 2020. Compensation shall be paid at the rate noted above, in accordance with our Agreement.

If you have any questions regarding this request, please contact Brent Weston at (661) 723- 6215.

Sincerely,

Brent Weston
Coordinator III Parks, Recreation and Arts Department

cc: Ronda Armstrong, Purchasing

April 9,2020

Mr. Matt Rogers, Manager
Terracare Associates
1250 Ames Avenue
Milpitas, California 95035

RE: Additions to the Landscape Maintenance Services Agreement

Dear Mr. Rogers:

Please add the following location to your schedule for maintenance:

CATEGORY LOCATION PROJECT NUMBER (Sq. Ft.) UNIT COST MONTHLY COST III Ave. I & 10th Street West 17-012 7143 .0074 $52.86

Maintenance shall commence on May 1, 2020. Compensation shall be paid at the rate noted above, in accordance with our Agreement.

If you have any questions regarding this request, please contact Brent Weston at (661) 723- 6215.

Sincerely,

Brent Weston
Coordinator III, Parks, Recreation and Arts

CC: Ronda Armstrong, Purchasing

44933 Fern Avenue  Lancaster, CA 93534  661.723.6000 www.cityoflancasterca.org

October 1, 2020

Matt Rogers, Manager
Terracare Associates
1250 Ames avenue
Milpitas, California 95035

Re: Additions to the Landscape Maintenance Services agreement

Dear Mr. Rogers:

Please add the following location to your schedule for maintenance:

CATEGORY LOCATION (SQ. FT.) UNIT COST MONTHLY COST
III 43843 Division Street 3455 .0074 $25.57

Maintenance shall commence on November 1, 2020. Compensation shall be paid at the rate noted above, in accordance with our Agreement.

If you have any questions regarding this request, please contact Brent Weston at (661) 723- 6215.

Sincerely,

Brent Weston
Coordinator III
Parks, Recreation and Arts Department

CC: Dan Berkovitz
R. Rex Parris
Marvin E. Crist
Ken Mann
Raj Malhi
Darrell Dorris

Jason Caudle

Mayor
Vice Mayor
Council Member
Council Member
Council Member

City Manager
44933 Fern Avenue  Lancaster, CA 93534  661.723.6000 www.cityoflancasterca.org

October 12, 2020

Matt Rogers, Manager
Terracare Associates
1250 Ames avenue
Milpitas, California 95035

Re: Additions to the Landscape Maintenance Services agreement

Dear Mr. Rogers:

Please add the following location to your schedule for maintenance:

CATEGORY LOCATION (SQ. FT.) UNIT COST MONTHLY COST
III SW Corner – Ave K & 27th 1,275 .0074 $9.44
Street West

Maintenance shall commence on November 16, 2020. Compensation shall be paid at the rate noted above, in accordance with our Agreement.

If you have any questions regarding this request, please contact Brent Weston at (661) 723- 6215.

Sincerely,

Brent Weston
Coordinator III
Parks, Recreation and Arts Department

CC: Dan Berkovitz
R. Rex Parris
Marvin E. Crist
Ken Mann
Raj Malhi
Darrell Dorris

Jason Caudle

Mayor
Vice Mayor
Council Member
Council Member
Council Member

City Manager
April 26, 2021

Mr. Matt Rogers, Manager
Terracare Associates
1250 Ames Avenue
Milpitas, Ca. 95035
Re: Additions to the Landscape Maintenance Services Agreement

Dear Mr. Rogers:

Please add the following location to your schedule for maintenance:

Category Location (Sq. Ft.) Unit Cost Monthly Cost III 10th West, H to H6 21,590 .0074 $159.77

Maintenance shall commence on June 1, 2021. Compensation shall be paid at the rate noted above, in accordance with our Agreement.

If you have any questions regarding this request, please contact Brent Weston at (661) 723-6215.

Sincerely,

Brent Weston
Coordinator III
Parks, Recreation and Arts Department

CC: Christine Malta

44933 Fern Avenue
Lancaster, CA 93534
661.723.6000
cityoflancasterca.org

March 31, 2022

Matt Rogers, Manager
Terracare Associates
1250 Ames avenue
Milpitas, California 95035

Subject: Re: Additions to the Landscape Maintenance Services agreement

Please add the following location to your schedule for maintenance on the LMD CONTRACT:

CATEGORY LOCATION SQ.

FOOT
UNIT
COST

MONTHLY
COST
III Medians on Ave J between 15th
and 25th W
20,123 $0.013 $261.60

Maintenance shall commence on May 2, 2022. Compensation shall be paid at the rate noted above, in accordance with our Agreement.

If you have any questions regarding this request, please contact Brent Weston at (661) 723-6215.

Sincerely,
Brent Weston

CC: Christine Malta
Nicole Jones
Ben Rejniak

44933 Fern Avenue
Lancaster, CA 93534
661.723.6000
cityoflancasterca.org

March 31, 2022

Matt Rogers, Manager
Terracare Associates
1250 Ames avenue
Milpitas, California 95035

Subject: Re: Additions to the Landscape Maintenance Services agreement

Please add the following location to your schedule for maintenance on the LMD CONTRACT:

CATEGORY LOCATION SQ.

FOOT
UNIT
COST

MONTHLY
COST
III Medians on 20th St W between
Home Depot and Avenue J
8,130 $0.013 $105.69

Maintenance shall commence on May 2, 2022. Compensation shall be paid at the rate noted above, in accordance with our Agreement.

If you have any questions regarding this request, please contact Brent Weston at (661) 723-6215.

Sincerely,
Brent Weston

CC: Christine Malta
Nicole Jones
Ben Rejniak

STAFF REPORT
City of Lancaster
CC 9
08/09/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: George Harris, Director of Finance
Subject:Approval of the Cayenta annual maintenance invoice for FY 23 Recommendation:

Approve payment of the Cayenta annual maintenance invoice for fiscal year 2023.

Fiscal Impact:
$133,925.96 as per the attached invoice to be paid from account 112-4315-302.

Background:

Cayenta, a division of Harris Computer Systems, is an integrated suite of financial software applications for local government. The City has been using Cayenta for its financial software since 1987 and relies on Harris Computer Systems for support and maintenance. This allows staff to have access to vendor resources for support if the need arises as well as providing the city with patches and updates to the system as needed.

GH:JH
Attachment:

Invoice for FY23
City of Lancaster
Attention: Accounts Payable
444933 North Fern Avenue
Lancaster, CA 93534
USA
Invoice MN00137604
Description
Ship To
City of Lancaster
Attention: Accounts Payable
444933 North Fern Avenue
Lancaster, CA 93534
USA
Date

Page 1 of 1 ends

LANC LOCAL DELIVERY
PO Number Customer No. Salesperson ID Shipping Method Payment Terms Unit Price Ext PriceOrdered Item Number
Remit To: N. Harris Computer Corporation
62133 Collections Center Drive
Chicago, IL 60693-0621
Bill to
MN JUL
4/30/2022
CAY - TPM Cognos: 7/1/2022 to 6/30/2023 US$ 18,830.40 US$ 18,830.40 1.00 CAY - TPM Microfocus Acucobol Runtime: 7/1/2022 to 6/30/2023 US$ 351.52 US$ 351.52 1.00 CAY - TPM Microfocus Acucobol: 7/1/2022 to 6/30/2023 US$ 1,887.35 US$ 1,887.35 1.00 CAY - TPM Microfocus Acu4GL Runtime: 7/1/2022 to 6/30/2023 US$ 2,743.77 US$ 2,743.77 1.00 CAY - TPM Microfocus Acu4GL: 7/1/2022 to 6/30/2023 US$ 9,260.23 US$ 9,260.23 1.00 CAY - TPM Oracle: 7/1/2022 to 6/30/2023 US$ 2,866.18 US$ 2,866.18 1.00 CAY - TPM Oracle - 9i Standard Edition: 7/1/2022 to 6/30/2023 US$ 1,340.93 US$ 1,340.93 1.00 CAY - TPM Uniface Runtime : 7/1/2022 to 6/30/2023 US$ 929.43 US$ 929.43 1.00 CAY - MAINT Accounts Payable: 7/1/2022 to 6/30/2023 US$ 6,442.08 US$ 6,442.08 1.00 CAY - MAINT Accounts Receivable: 7/1/2022 to 6/30/2023 US$ 4,026.29 US$ 4,026.29 1.00 CAY - MAINT Cash Collections: 7/1/2022 to 6/30/2023 US$ 4,026.29 US$ 4,026.29 1.00 CAY - MAINT Equipment Management: 7/1/2022 to 6/30/2023 US$ 4,026.29 US$ 4,026.29 1.00 CAY - MAINT GL w/ Reporting & Project Tracking: 7/1/2022 to 6/30/2023 US$ 3,905.73 US$ 3,905.73 1.00 CAY - MAINT General Ledger: 7/1/2022 to 6/30/2023 US$ 38,300.36 US$ 38,300.36 1.00 CAY - MAINT Inventory: 7/1/2022 to 6/30/2023 US$ 2,868.71 US$ 2,868.71 1.00 CAY - MAINT Job Costing: 7/1/2022 to 6/30/2023 US$ 4,781.23 US$ 4,781.23 1.00 CAY - MAINT Menu & System Administration: 7/1/2022 to 6/30/2023 US$ 781.17 US$ 781.17 1.00 CAY - MAINT Menu & System Administration: 7/1/2022 to 6/30/2023 US$ 9,382.75 US$ 9,382.75 1.00 CAY - MAINT Payroll (Read Only): 7/1/2022 to 6/30/2023 US$ 7,171.86 US$ 7,171.86 1.00 CAY - MAINT Purchasing: 7/1/2022 to 6/30/2023 US$ 6,442.08 US$ 6,442.08 1.00 CAY - MAINT Purchasing Management/PO: 7/1/2022 to 6/30/2023 US$ 937.37 US$ 937.37 1.00 CAY - MAINT Human Resources Module (Read Only): 7/1/2022 to 6/30/2023 US$ 5,313.70 US$ 5,313.70 1.00 CAY - MAINT Payment Processing Annual Maintenance: 7/1/2022 to 6/30/2023 US$ 1,378.13 US$ 1,378.13 1.00 Subtotal
Misc
Tax
Freight
Total
US$ 137,993.85
US$ 0.00
US$ 0.00
US$ 0.00
US$ 0.00
US$ 137,993.85
Trade Discount
Invoice Questions? Please call Jeimy Vanegas at 613-226-5511 or email [email protected]
Payment is due before the maintenance period start date. Therefore, please allow at least 10 business days prior to the due date to mail your payment. Failure to make payment by maintenance period start date may result in inability to receive support and product updates / upgrades.

STAFF REPORT
City of Lancaster
CC 10
08/09/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: George Harris, Director of Finance
Subject:Approval of the Infinity Technologies Consulting Services Agreement Recommendation:

Approve payment of the Infinity Technologies Consulting Services Agreement for FY23.

Fiscal Impact:
$140,000.00 as per the attached quote to be paid from account 112-4315-302.

Background:

The City of Lancaster utilizes consulting services from Infinity Technologies for our Geographic Information System (GIS) development, improvements, and general IT needs. GIS is a framework for gathering, managing, and analyzing data. GIS includes many types of data which are organized into layers of information and visualizations using maps. This allows deeper insights into data which can identify patterns, relationships, and situations that help users make more informed decisions. GIS is used throughout many areas of the City including Economic Development, Planning, Public Works, Facilities and Parks, Emergency Management, Housing, Utility Services, Capital Engineering, and Code Enforcement. Infinity Technologies has been working with the City since 2021 and City IT staff want to continue the relationship for the foreseeable future. The proposed Consulting Services Agreement with Infinity Technologies will allow the City to continue to expand on and improve the GIS usage across the City.

GH:JH
Attachment:

City of Lancaster - Infinity Technology’s GIS Support Scope of Work

CITY OF LANCASTER

INFINITY TECHNOLOGIES GIS/IT SUPPORT SERVICES
July 1, 2022
Scope of Work and Costs
Project Background and Description
The City of Lancaster uses a Esri based GIS platform to support a variety of departmental mapping needs.

These include Development Services , Housing, Parks and Recreation, and Economic Development Departments.

Over the last several years, attempts have been made to modernize the GIS platform to serve enterprise needs, including a centralized database, integrations with other business systems, WebGIS applications (internal and public facing), cross department data maintenance workflows/solutions, and general GIS/IT support services.

Ongoing and a dditional work needs to be performed to modify the architecture and improve the GIS and ITsolutions/services to match the growing GIS and IT needs across the city departments.

To accomplish this work, Lancaster is seeking additional GIS and IT resources to support these broader GIS tasks.

Lancaster would like to focus GIS support on:

• General GIS Support
• GIS Data Development and/or
Maintenance
• GIS Data Maintenance Workflows
• GIS Integration with 3rd Party Systems
• Internal Applications
• Public Facing GIS Applications
• Back-end Automation
• ArcGIS Enterprise Redesign and
Implementation
• As Needed IT Support

As part of ongoing GIS/IT support, Infinity Technologies proposes to provide the following Scope of Work tasks.

Scope of Work Tasks
The Scope of Work for the Information Technology GIS Support is broken into (8) tasks:

1. General GIS Support
• On request from City staff, provide general GIS support for map creation, analysis, and reports.
• Support will be provided by on onsite GIS Technician and additional offsite GIS staff Estimated Costs: $40,000

2. GIS Data Development and/or Maintenance
• On request from City staff, provide GIS support to develop new GIS dataset and/or maintenance activity on existing GIS datasets.
• Support will be provided by on onsite GIS Technician and additional offsite GIS staff Estimated Costs: $20,000

3. GIS Data Maintenance Workflows
• Review and prioritize data maintenance workflows. This may include discussions with other departments to understand current data maintenance workflows and how these can be improved using the ArcGIS Enterprise platform.
• Work with City GIS staff to implement new data maintenance workflows utilizing ArcGIS Enterprise and ArcGIS Pro.
• Work with City GIS staff to implement new data maintenance workflows utilizing field collection applications.
• Support will be provided by on onsite GIS Technician and additional offsite GIS staff Estimated Costs: $4,500

4. GIS Integration with 3rd Party Business Systems
• Work with City staff to document GIS integration requirements for 3rd party business systems (Accela, Asset Management, Business License, Code Enforcement, etc…) • Design, build, and test GIS workflows and solutions to support 3rd party business systems • Finalize and implement production quality solutions
• Document and maintain solutions to meet the level of service required • Support will be provided through a mix of onsite and offsite work by a Senior GIS Analyst.

Estimated Costs: $10,000

5. Internal GIS Applications
• Review and prioritize new GIS applications or improvements to existing GIS applications that serve Lancaster staff.
• Work with City GIS staff to implement new or improved GIS applications for City staff use. • Work may include data publishing and application configuration. • Support will be provided by on onsite GIS Technician and additional offsite GIS staff Estimated Costs: $3,000

6. Public Facing GIS Applications
• Review and prioritize new GIS applications or improvements to existing GIS applications that are public facing.
• Work with City staff to implement new or improved GIS applications that are public facing. • Work may include data publishing and application configuration. • Support will be provided by on onsite GIS Technician and additional offsite GIS staff Estimated Costs: $3,000

7. Back-end Automation
• Review and prioritize automation requirements. Write, test, and implement python scripting code to automate the highest priority needs.
• Includes update workflows for addresses, parcels, and street centerlines. • May include additional geoprocessing routines.
• Support will be provided through a mix of onsite and offsite work by a Senior GIS Analyst.

Estimated Costs: $2,000

8. ArcGIS Enterprise Redesign and Implementation
• Review existing ArcGIS Enterprise setup
• Recommend and implement changes to accommodate future GIS requirements that align with the new platform architecture
• Migrate existing content and services to new platform • Support will be provided by an onsite and offsite Senior GIS Analyst.

Estimated Costs: $7,500

9. As Needed Information Technology Support
• Information Technology support to augment existing staffing • Complete IT support tickets
• Software upgrades and installations
• Hardware replacement
Estimated Costs: $50,000

TOTAL ESTIMATED COST - $140,000

Proposed Schedule/timeline
Project Task Estimated Start Date

1. General GIS Support July 2022

2. GIS Data Development and/or Maintenance July 2022

3. GIS Data Maintenance Workflows August 2022

4. GIS Integration with 3rd Party Systems July 2022

5. Internal Applications July 2022

6. Public Facing GIS Applications September 2022

7. Back-end Automation October 2022

8. ArcGIS Enterprise Redesign and Implementation July 2022

9. As needed Information Technology Support July 2022
Infinity Technologies GIS Staff/Hourly Rates
Name Title Rate
Estimated
Hours Primary Task Responsibility
Mark
Dumford
Project
Manager
$140 40 Project Management
On-site Training/Workshops
Assessment / Recommendations
Todd
Lighthizer
Sr. GIS Analyst $130 10 ArcGIS Enterprise
3rd Party System Integration
Back-end Automation
Lillian Lee GIS Analyst $105 80 WebGIS GIS Applications 3rd Party System Integration
GIS Data Maintenance Workflows
Emily Cline GIS Technician $80 800 GIS Data Development / Maintenance General GIS Support
WebGIS Applications
GIS Data Maintenance Workflows

Infinity Technologies IT Staff/Hourly Rates (As Needed) Name Title Rate Responsibilities
TBD IT Project Manager $145 Information Technology Support as needed TBD Network Engineer $135 Information Technology Support as needed TBD System Engineer $135 Information Technology Support as needed TBD System Analyst $105 Information Technology Support as needed TBD System Technician $90 Information Technology Support as needed TBD Help Desk $85 Information Technology Support as needed

STAFF REPORT
City of Lancaster
CC 11
08/09/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: George Harris, Director of Finance
Subject:Approval of the Nutanix three-year support and licensing agreement Recommendation:

Approve payment of the Nutanix three-year support and licensing agreement for FY23, FY24, and FY25.

Fiscal Impact:
$204,712.97 as per the attached quote to be paid from account 112-4315-302.

Background:

The City of Lancaster utilizes Nutanix Hyperconverged Infrastructure (HCI) for our server and data storage needs. Nutanix HCI is a combination of servers and storage built into a distributed infrastructure platform with intelligent software to create flexible building blocks that replace legacy infrastructure consisting of separate servers, storage networks, and storage arrays. This eliminates common pain points associated with legacy infrastructure and allows for greater flexibility in computing resources as well as exceptional efficiency. Nutanix HCI has been employed with the City since 2017 and City IT staff want to continue the relationship with Nutanix for the foreseeable future. The proposed support and licensing agreement provides the City with hardware and software support to ensure the City’s data center hardware and applications are available and operational with limited interruptions. The three-year agreement allows the City to save $53,941 dollars over three one-year agreements.

GH:JH
Attachment:

SHI Quote - 21891858

Pricing Proposal
Quotation #:  21891858
Created On:  4/15/2022
Valid Until:   8/23/2022

CITY OF LANCASTER   Inside Account Manager

Joe Haggard
44933 N FERN AVENUE
ATTN: AP
Lancaster, CA 93534
United States
Phone: 6617236057
Fax:

Email: [email protected]

Mark Brum
290 Davidson Ave
Somerset, NJ 08873
Phone: 732-652-4760
Fax:

Email: [email protected]
All Prices are in US Dollar (USD)
Product Qty Your Price Total

1 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00994551
Coverage Term: 7/31/2023 – 6/17/2025
1 $1,151.54 $1,151.54

2 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00994552
Coverage Term: 7/31/2023 – 6/17/2025
1 $1,151.54 $1,151.54

3 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00994553
Coverage Term: 7/31/2023 – 6/17/2025
1 $1,151.54 $1,151.54

4 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00994554
Coverage Term: 7/31/2023 – 6/17/2025
1 $1,151.54 $1,151.54

5 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00994557
Coverage Term: 7/31/2023 – 6/17/2025
1 $1,190.98 $1,190.98

6 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
1 $2,571.43 $2,571.43
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01216932
Coverage Term: 6/4/2023 – 6/17/2025

7 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01216933
Coverage Term: 6/4/2023 – 6/17/2025
1 $2,571.43 $2,571.43

8 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01216934
Coverage Term: 6/4/2023 – 6/17/2025
1 $2,571.43 $2,571.43

9 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01216935
Coverage Term: 6/4/2023 – 6/17/2025
1 $2,571.43 $2,571.43

10 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01216936
Coverage Term: 6/4/2023 – 6/17/2025
1 $2,571.43 $2,571.43

11 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01221469
Coverage Term: 8/24/2022 – 6/17/2025
1 $2,650.19 $2,650.19

12 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01221470
Coverage Term: 8/24/2022 – 6/17/2025
1 $2,650.19 $2,650.19

13 R-SW-PRS-PRO-NODE
Nutanix - Part#: R-SW-PRS-PRO-NODE
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01221471
Coverage Term: 8/24/2022 – 6/17/2025
1 $2,650.19 $2,650.19

14 R-SW-AOS-PRO-PRD
Nutanix - Part#: R-SW-AOS-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: 20SW000146782
Coverage Term: 7/31/2023 – 6/17/2025
1 $13,804.37 $13,804.37

15 R-L-CORES-PRO-PRD  24 $0.00 $0.00
Nutanix - Part#: R-L-CORES-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00932367
Coverage Term: 7/31/2023 – 6/17/2025

16 R-L-FLASHTiB-PRO-PRD
Nutanix - Part#: R-L-FLASHTIB-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00932368
Coverage Term: 7/31/2023 – 6/17/2025
4 $0.00 $0.00

17 R-SW-AOS-PRO-PRD
Nutanix - Part#: R-SW-AOS-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: 20SW000159582
Coverage Term: 7/31/2023 – 6/17/2025
1 $47,166.58 $47,166.58

18 R-L-CORES-PRO-PRD
Nutanix - Part#: R-L-CORES-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00994555
Coverage Term: 7/31/2023 – 6/17/2025
96 $0.00 $0.00

19 R-L-FLASHTiB-PRO-PRD
Nutanix - Part#: R-L-FLASHTIB-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-00994556
Coverage Term: 7/31/2023 – 6/17/2025
14 $0.00 $0.00

20 R-SW-AOS-PRO-PRD
Nutanix - Part#: R-SW-AOS-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: 21SW000202050
Coverage Term: 6/4/2023 – 6/17/2025
1 $78,562.85 $78,562.85

21 R-L-CORES-PRO-PRD
Nutanix - Part#: R-L-CORES-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01216930
Coverage Term: 6/4/2023 – 6/17/2025
140 $0.00 $0.00

22 R-L-FLASHTiB-PRO-PRD
Nutanix - Part#: R-L-FLASHTIB-PRO-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01216931
Coverage Term: 6/4/2023 – 6/17/2025
18 $0.00 $0.00

23 Multi-year Renewal License for VDI per User pack PRO entitlement,includes Production 24/7 Software Support
Nutanix - Part#: R-SW-VDI-CORE-PRD-MY
Contract Name: Open Market
Contract #: Open Market
Serial #: 21SW000205258, LIC-01221468
Coverage Term: 8/24/2022 – 6/17/2025
52 $424.02 $22,049.04

24 R-SW-FILES-AOS-1TIB-PRD
Nutanix - Part#: R-SW-FILES-AOS-1TIB-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: 22SW000227035, LIC-01402207
Coverage Term: 2/22/2023 – 6/17/2025
11 $675.88 $7,434.68

25 R-SW-OBJECTS-DED-PRD
Nutanix - Part#: R-SW-OBJECTS-DED-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: 22SW000231702
Coverage Term: 3/30/2025 – 6/17/2025
1 $1,411.64 $1,411.64

26 R-L-OBJECTS-DED-1T-PRD
Nutanix - Part#: R-L-OBJECTS-DED-1T-PRD
Contract Name: Open Market
Contract #: Open Market
Serial #: LIC-01409476
Coverage Term: 3/30/2025 – 6/17/2025
52 $0.00 $0.00

27 24/7 Production Level Multi Year HW Support Renewal for Nutanix HCI appliance Nutanix - Part#: RS-HW-PRD-MY
Contract Name: Open Market
Contract #: Open Market
Serial #: 20SM3F400284
Coverage Term: 7/31/2023 – 6/17/2025
1 $2,438.35 $2,438.35

28 24/7 Production Level Multi Year HW Support Renewal for Nutanix HCI appliance Nutanix - Part#: RS-HW-PRD-MY
Contract Name: Open Market
Contract #: Open Market
Serial #: 20SM3F400285
Coverage Term: 7/31/2023 – 6/17/2025
1 $2,438.35 $2,438.35

29 24/7 Production Level Multi Year HW Support Renewal for Nutanix HCI appliance Nutanix - Part#: RS-HW-PRD-MY
Contract Name: Open Market
Contract #: Open Market
Serial #: 20FM3F260171
Coverage Term: 7/31/2023 – 6/17/2025
1 $171.04 $171.04

30 24/7 Production Level Short Term Support Renewal for Nutanix HCI appliance Nutanix - Part#: RS-PRD-ST
Contract Name: Open Market
Contract #: Open Market
Serial #: 18FM38150080
Coverage Term: 8/1/2023 – 10/31/2023
1 $203.65 $203.65

31 24/7 Production Level Short Term Support Renewal for Nutanix HCI appliance Nutanix - Part#: RS-PRD-ST
Contract Name: Open Market
Contract #: Open Market
Serial #: 17FM37380136
Coverage Term: 8/1/2023 – 10/31/2023
1 $423.70 $423.70

32 24/7 Production Level Short Term Support Renewal for Nutanix HCI appliance Nutanix - Part#: RS-PRD-ST
Contract Name: Open Market
Contract #: Open Market
Serial #: 17FM37380138
1 $423.70 $423.70
Coverage Term: 8/1/2023 – 10/31/2023

33 24/7 Production Level Multi Year HW Support Renewal for Nutanix HCI appliance Nutanix - Part#: RS-HW-PRD-MY
Contract Name: Open Market
Contract #: Open Market
Serial #: 21FM6K330065
Coverage Term: 8/25/2023 – 6/17/2025
1 $1,580.16 $1,580.16

Subtotal $204,712.97
Shipping $0.00
*Tax $0.00
Total $204,712.97
*Tax is estimated. Invoice will include the full and final tax due.

Additional Comments
Nutanix has a no returns policy.

Please note, if Emergency Connectivity Funds (ECF) will be used to pay for all or part of this quote, please let us know as we will need to ensure compliance with the funding program.

Hardware items on this quote may be updated to reflect changes due to industry wide constraints and fluctuations.

1. By issuing a purchase order or acknowledging this quote, when applicable, Customer certifies that employees at each of their locations adhere to all applicable export and re-export control laws and regulations covering the distributed products purchased and/or received by the Customer.

2. By issuing a purchase order or acknowledging this quote, and when applicable, Customer understands that the commodities, software and/or technology (“Items”) it purchases or receives under this quote may be subject to export, re-export, or other restrictions. Customer agrees to comply with all applicable laws and regulations relating to the export and re-export of such Items obtained by Customer.

Thank you for choosing SHI International Corp! The pricing offered on this quote proposal is valid through the expiration date listed above. To ensure the best level of service, please provide End User Name, Phone Number, Email Address and applicable Contract Number when submitting a Purchase Order. For any additional information including Hardware, Software and Services Contracts, please contact an SHI Inside Sales Representative at (888) 744-4084. SHI International Corp. is 100% Minority Owned, Woman Owned Business.  TAX ID# 22-3009648; DUNS# 61-1429481; CCR# 61-243957G; CAGE 1HTF0 The products offered under this proposal are Open Market and resold in accordance with the terms and conditions at  SHI Online Customer Resale Terms and Conditions .

STAFF REPORT
City of Lancaster
Date: August 09, 2022
To: Mayor Parris and City Council Members
From: Jason Caudle, City Manager;
George N. Harris II, Finance Director
Subject:Approve agreement between the Antelope Valley Air Quality Management District and the City of Lancaster
Recommendation:

Approve a 5-year staffing agreement between the Antelope Valley Air Quality Management District (AVAQMD) and the City of Lancaster (CITY).

Fiscal Impact:

The contract requires the AVAQMD to reimburse the City the full costs for a total of six (6) full- time employees plus 10% for administrative overhead. The estimated cost of the employees is $1,194,344.26. The five employees will receive benefits equal to that of current non-represented city of Lancaster staff. The employees will be enrolled in CalPERS at the expense of AVAQMD.

Total costs does not include a relative share of the City’s unfunded pension liability.

Background:

AVAQMD is the local agency with the primary responsibility for the control of air pollution from all sources in the region. Currently, AVAQMD contracts with Mojave Desert Air Quality Management District (MDAQMD) for staffing and support services. MDAQMD is based in San Bernardino County and are subject to the labor costs and rates of the County of San Bernardino.

It was a suggestion of the AVAQMD board to look for options to reduce costs and to find a staffing solution more local to the Antelope Valley.

In March 2022, AVAQMD submitted a notice to terminate their contract with MDAQMD and pursue a staffing contract with the City of Lancaster. The contract with MDAQMD terminates on September 30, 2022. The contract term with the City of Lancaster is an initial five years with an option to extend for an additional two years. Per the contract the compensation terms are as follows:
•The CITY OF LANCASTER may purchase materials and supplies which will be reimbursed by the AVAQMD at the actual cost of the material or supplies; •AVAQMD shall pay the pro rata portion of the base salary and associated employment benefits for all time spent by Program Staff on AVAQMD matters as described in the Annual Budget. •The CITY OF LANCASTER agrees to provide the following products and services in the scope of this Agreement to the level used by the CITY OF LANCASTER in the scope of its CC 12
08/09/22
JC
1 0
0 3
regular business practices: financial and payroll systems as needed to provide human resource, staffing and fiscal support. Where the AVAQMD has purchased and/or owns user licenses or enhancements, or chooses to enhance any of these services beyond the level used by the CITY OF LANCASTER, the AVAQMD agrees to pay the costs for the enhancements and related maintenance.
•The CITY OF LANCASTER may make available certain services or products for which they are the sole owner, or certain services or purchases from which both the CITY and AVAQMD derive relevant benefits. The CITY OF LANCASTER may access a proportionate share of the purchase cost and/or service costs to the AVAQMD not to exceed a proportionate amount based on the ratio of Full-Time Equivalents or any other relevant use metric between both agencies at the end of current fiscal year or period of software use. •If additional services are required or requested over and above the services described in Exhibit 1 or which exceed the Annual Budget, as amended, then such services and associated costs shall be provided when directed and approved by the AVAQMD Governing Board. •AVAQMD will further pay a charge to cover administrative overhead and compensate the CITY OF LANCASTER for the indirect costs of delivering the services described herein. Said charge will be calculated as 10% of the total billed each month for services and will be added to the invoice.

The services outlined in the service contract are listed below for reference:

The CITY OF LANCASTER agrees to hire and provide staffing for the following positions to serve in the existing capacity on behave of the AVAQMD operations:

City of Lancaster
Title
City of
Lancaster
Employee
Group
AVAQMD
working Title
Starting Annual Salary Range Steps 1-6.
(City of Lancaster: Effective July 1, 2022)
Senior Manager 3000
Executive Director
(APCO) $143,704.13 $156,064.02 $164,277.92 $172,924.13 $182,025.40 $191,605.68 Manager 3000 Operations Manager $116,759.66 $122,597.65 $128,727.53 $135,163.91 $141,922.10 $155,679.43 Coordinator II 4000 Grants Analyst $80,833.66 $84,875.35 $89,119.11 $93,575.07 $98,253.82 $107,778.13 Inspector 4000 Air Quality Specialist III $80,833.66 $84,875.35 $89,119.11 $93,575.07 $98,253.82 $107,778.13 Specialist II 4000 Air Quality Specialist I $71,852.00 $75,444.60 $79,216.83 $83,177.68 $87,336.56 $95,802.84 Senior Administrative
Assistant 4000 Office Assistant $71,852.00 $78,032.01 $82,138.96 $86,462.06 $91,012.70 $95,802.84 The referenced salaries will be used as the initial salary basis for the employees involved in the initial transition. Annually, THE CITY OF LANCASTER and the AVAQMD will amend or confirm the titles and organizational structure in concurrence with the annual budget process. The CITY OF LANCASTER will provide all benefits for the above listed personnel as it does for all other CITY OF LANCASTER employees. As such all listed positions will be subject to amendments and changes approved by the CITY OF LANCASTER governing body.

Grants Account/Management: all activities including, but not limited to, making application for available funds, soliciting projects that meet the objectives of each grant program, developing and administering contracts to ensure the grant program objectives are met; disbursing funds and performing reviews on contract performance. A portion of the CITY OF LANCASTER finance department staff will supervise and account for the grant activity and the AVAQMD will be billed on a time and material basis for such support. 1 0
0 3
Administrative Services: all activities including, but not limited to, operations for a staffed office located in the AVAQMD jurisdiction with regular business operating hours, revenue collection and expenditure tracking, budget preparation and administration, development, implementation and maintenance of an automated system for tracking permits and permit activities, procurement and maintenance of facilities, operations and fixed assets as set forth in the annual budget, and miscellaneous expenses as identified in the annual budget. Financial and accounting services including, but not limited to, appropriate accounting procedures to maintain bank accounts, receive and expend funds and report accordingly, computer information systems.

Executive Services: all activities including, but not limited to services of the Air Pollution Control Officer/Executive Officer, direction and oversight of all operations of the AVAQMD, support for boards, commissions and committees, including the Governing Board and the Hearing Board.

GH
Attachment:

AVAQMD – COL Agreement Re Personnel 4892-6923-4982 v.1 Final AVAQMD – Exhibit 1 (003)
Adopted AVAQMD Budget FY23
1 | P a g e

EXHIBIT A

SCOPE OF MATERIALS AND SERVICES
The CITY OF LANCASTER agrees to provide services to the AVAQMD as specified in the Agreement, namely: provide administration and operations, adequate to meet the regulatory and legislated responsibilities of an air quality management district within the AVAQMD jurisdiction specified in Division 26 of the California Health & Safety Code (commencing with §39000). The scope of services that the CITY OF LANCASTER may provide as directed by the fiscal year budget are described below.

In the event the AVAQMD Governing Board redirects or appoints a third party to perform any of the services or functions listed herein to another party, contractor, consultant or vendor, the CITY OF LANCASTER will be relieved from any and all liabilities arising out of or connection with the performance of such services by any or all third parties from the effective date of such assignment. The AVAQMD shall indemnify and hold harmless the CITY OF LANCASTER, its agents and employees, against all liabilities arising out of or connected with the transfer of such assignment.

The CITY OF LANCASTER agrees to hire and provide staffing for the following positions to serve in the existing capacity on behalf of the AVAQMD operations:

City of Lancaster
Title
City of
Lancaster
Employee
Group
AVAQMD
working Title
Starting Annual Salary Range Steps 1-6.
(City of Lancaster: Effective July 1, 2022)
Senior Manager 3000
Executive Director
(APCO) $143,704.13 $156,064.02 $164,277.92 $172,924.13 $182,025.40 $191,605.68 Manager 3000 Operations Manager $116,759.66 $122,597.65 $128,727.53 $135,163.91 $141,922.10 $155,679.43 Coordinator II 4000 Grants Analyst $80,833.66 $84,875.35 $89,119.11 $93,575.07 $98,253.82 $107,778.13 Inspector 4000 Air Quality Specialist III $80,833.66 $84,875.35 $89,119.11 $93,575.07 $98,253.82 $107,778.13 Specialist II 4000 Air Quality Specialist I $71,852.00 $75,444.60 $79,216.83 $83,177.68 $87,336.56 $95,802.84 Senior Administrative
Assistant 4000 Office Assistant $71,852.00 $78,032.01 $82,138.96 $86,462.06 $91,012.70 $95,802.84 The referenced salaries will be used as the initial salary basis for the employees involved in the initial transition. Annually, THE CITY OF LANCASTER and the AVAQMD will amend or confirm the titles and organizational structure in concurrence with the annual budget process. The CITY OF LANCASTER will provide all benefits for the above listed personnel as it does for all other CITY OF 2 | P a g e
LANCASTER employees. As such all listed positions will be subject to amendments and changes approved by the CITY OF LANCASTER governing body.

Grant Account/Management: all activities including, but not limited to, making application for available funds, soliciting projects that meet the objectives of each grant program, developing and administering contracts to ensure the grant program objectives are met; disbursing funds and performing reviews on contract performance. A portion of the CITY OF LANCASTER finance department staff will supervise and account for the grant’s activity and the AVAQMD will be billed on a time and material basis for such support.

Administrative Services: all activities including, but not limited to, operations for a staffed office located in the AVAQMD jurisdiction with regular business operating hours, revenue collection and expenditure tracking, budget preparation and administration, development, implementation and maintenance of an automated system for tracking permits and permit activities, procurement and maintenance of facilities, operations and fixed assets as set forth in the annual budget, and miscellaneous expenses as identified in the annual budget. Financial and accounting services including, but not limited to, appropriate accounting procedures to maintain bank accounts, receive and expend funds and report accordingly, computer information systems.

Executive Services: all activities including, but not limited to services of the Air Pollution Control Officer/Executive Officer, direction and oversight of all operations of the AVAQMD, support for boards, commissions and committees, including the Governing Board and the Hearing Board.
1 | P a g e

AGREEMENT BETWEEN THE

ANTELOPE VALLEY AIR QUALITY MANAGEMENT DISTRICT

AND THE CITY OF LANCASTER
This agreement (Agreement) is made between the ANTELOPE VALLEY AIR QUAILITY MANAGEMENT DISTRICT (AVAQMD) AND THE CITY OF LANCASTER (CITY).

RECITALS
WHEREAS, AVAQMD is the local agency with the Primary responsibility for the control of air pollution from all sources other than vehicular sources within the local jurisdiction (Health & Safety Code §39002, 40000); and
WHEREAS, AVAQMD has a jurisdiction as described in Health & Safety Code §41300(b) and more particularly described in AVAQMD Rule 103; and WHEREAS, the CITY OF LANCASTER is within the jurisdiction as described in Health & Safety Code §41300(b);

WHEREAS, the AVAQMD agrees to contract from the CITY OF LANCASTER services necessary to provide air pollution control services including human resources, staffing and fiscal administration adequate to meet the regulatory and legislated responsibilities of an air quality management district within the AVAQMD jurisdiction; and WHEREAS, the CITY agrees to provide such services consistent with all applicable laws and regulations pursuant to the provisions of this Agreement; and WHEREAS, the AVAQMD and the CITY OF LANCASTER together agree to enter into this Agreement pursuant to the provisions of Title 1, Division 7, Chapter 5, Article 1 of the California Government Code (commending with §6500).

In consideration of the mutual covenants and conditions the AVAQMD and the CITY OF LANCASTER agree as follows:

TERMS AND CONDITIONS

1. PURPOSE
2 | P a g e
The purpose of this Agreement is for the AVAQMD to contract from the CITY OF LANCASTER certain administrative and operations services as AVAQMD and the CITY OF LANCASTER have determined are necessary to enable AVAQMD to meet the regulatory and legislated responsibilities of an air quality management district for compensation consistent with all applicable laws and regulations. This Agreement is entered into pursuant to the provisions of Title 1, Division 7, Chapter 5, Article 1 of the California Government Code (commencing with §6500).

2. TERM OF AGREEMENT
The term of this Agreement shall be for a period of five (5) years commencing on October 1, 2022 and ending on June 30, 2027, with an option to continue for two (2) more years under the same terms and conditions, unless earlier terminated, extended, or modified as provided herein.

Although this Agreement will become effective as of October 1, 2022, and the parties will commence planning for the 2022/2023 fiscal year, it is intended that the provision of Services pursuant to this Agreement may commence prior to October 1, 2022, in preparation of the Agreement. Certain services that are provided between October 1, 2022 and June 30, 2023 will be subject to the existing Agreement between the MDAQMD and AVAQMD for administrative services specific to certain software licenses.

3. SCOPE OF SERVICES
The CITY OF LANCASTER agrees to provide the human resource, staffing and fiscal administration, as specified in “Scope of Materials and Services” (Exhibit “A”), attached and incorporated by this reference (collectively, the “Services”). The CITY OF LANCASTER and AVAQMD will mutually agree upon an annual budget for the Services based on a best estimate of the costs to provide such Services and historical data, which budget will be adopted by AVAQMD prior to the commencement of each fiscal year (“Annual Budget”). The Annual Budget for the fiscal year inclusive of October 1, 2022, is attached hereto as Exhibit “B”. The Annual Budget will be subject to amendment in accordance with changes in the actual costs of goods and services provided by the CITY OF LANCASTER as described in Section 5(c). Exhibit 1 may be amended in whole or in part to reflect any changes or adjustments as directed by the actions of the governing bodies of the AVAQMD and/or the CITY OF LANCASTER. For purposes of interpretation of the scope and nature of the Services, the governing order of document precedence shall be first Exhibit 1 and second the current fiscal year budget for the AVAQMD, as amended. For all subsequent fiscal years the annual budget will be effective July 1-June 30 of each year.

4. COMPENSATION
The CITY OF LANCASTER shall perform its obligations under this Agreement in accordance with the approved Annual Budget, as amended, each fiscal year during the term of 3 | P a g e
this Agreement or until the termination or expiration of this Agreement. Compensation is based on the cost matrix as described below:

A. The CITY OF LANCASTER may purchase materials and supplies which will be reimbursed by the AVAQMD at the actual cost of the material or supplies; B. AVAQMD shall pay the pro rata portion of the base salary and associated employment benefits for all time spent by Program Staff (as defined in Section 11) on AVAQMD matters as described in the Annual Budget.

C. The CITY OF LANCASTER agrees to provide the following products and services in the scope of this Agreement to the level used by the CITY OF LANCASTER in the scope of its regular business practices: financial and payroll systems as needed to provide human resource, staffing and fiscal support. Where the AVAQMD has purchased and/or owns user licenses or enhancements, or chooses to enhance any of these services beyond the level used by the CITY OF LANCASTER, the AVAQMD agrees to pay the costs for the enhancements and related maintenance.

D. Except as provided in Paragraph C above, the CITY OF LANCASTER may make available certain services or products for which they are the sole owner, or certain services or purchases from which both the CITY and AVAQMD derive relevant benefits. The CITY OF LANCASTER may assess a proportionate share of the purchase cost and/or service costs to the AVAQMD not to exceed a proportionate amount based on the ratio of Full- Time Equivalents or any other relevant use metric between both agencies at the end of current fiscal year or period of software use.

E. If additional services are required or requested over and above the services described in Exhibit 1 or which exceed the Annual Budget, as amended, then such services and associated costs shall be provided when directed and approved by the AVAQMD Governing Board.

F. AVAQMD will further pay a charge to cover administrative overhead and compensate the CITY OF LANCASTER for the indirect costs of delivering the services described herein.

Said charge will be calculated as 10% of the total billed each month for services and will be added to the invoice.

5. PAYMENT OF COSTS
On a monthly basis or as necessary, the CITY OF LANCASTER shall deliver to the AVAQMD an invoice for materials and services provided. The invoice shall include a description of the materials and services provided.
4 | P a g e
A. Payment for the costs of services and materials provided by the CITY OF LANCASTER to the AVAQMD pursuant to this Agreement shall be made at the direction of the AVAQMD Governing Board, according to the regular check approval process.

B. Professional services of the CITY OF LANCASTER staff will be billed monthly at 1/12 of the contracted amount approved in the annual AVAQMD Budget as set forth in the line item, “Program Staff”.

C. Not less than quarterly, the CITY OF LANCASTER will reconcile the actual costs to deliver the Services against the estimates approved in the Annual Budget. If the actual cost to deliver the Services exceeds the estimate in the Annual Budget, then the CITY OF LANCASTER will be entitled to invoice AVAQMD for such excess cost. If the actual cost to deliver the Services is less than the estimate in the Annual Budget, then the CITY OF LANCASTER will credit AVAQMD for such cost saving. If an increase or decrease in actual cost is expected to continue for the remainder of the fiscal year, then the Annual Budget and the monthly billing will be modified accordingly, provided however, that with respect to increases in the Annual Budget, the CITY OF LANCASTER will cooperate with AVAQMD to find ways to mitigate such increases.

D. The AVAQMD shall pay the amount indicated on the invoice within forty-five (45) days of the date of the invoice. If the AVAQMD does not pay the amount indicated on the invoice with forty-five (45) days, interest may accrue on the unpaid amount at the legal rate of interest per annum or such rate as allowed by any subsequent amendment to California Law.

In the event the AVAQMD disputes an amount indicated on an invoice, such dispute shall be resolved in accordance with the conflict resolution procedures as set forth in Section 8 below.

In the event of such a dispute, interest will accrue on only that part of the disputed amount which is determined to be due and owing to the CITY OF LANCASTER as provided in Section 4 above.

In the event of a breach or termination of this Agreement, the CITY OF LANCASTER is entitled to payment for Services actually performed and materials actually provided as of the date of the breach or termination, In such event the CITY OF LANCASTER shall provide a final invoice as set forth above detailing the materials and services provided and hours expended for the period between the last date indicated on the previous invoice to the date of the breach or termination. The final invoice will include the cost of the CITY OF LANCASTER to transition all Dedicated Staff, as defined in Section 11, and for AVAQMD to assume all Personnel Costs as set forth in Section 11.

6. INDEMNITY AND LIABILITY
AVAQMD and the CITY OF LANCASTER shall, to the extent authorized by law, indemnify and hold harmless each other, their agents and employees against all liabilities arising out of or connected with the performance of this Agreement. 5 | P a g e
In the event litigation is threatened or commenced by a third party regarding negligent acts or omissions of the AVAQMD, its officers, volunteers and authorized agents while performing services for the AVAQMD to which the CITY OF LANCASTER becomes a party, the AVAQMD shall retain and bear all litigation costs of the AVAQMD and THE CITY OF LANCASTER engendered by such litigation.

In the event litigation is threatened or commenced by a third party regarding negligent acts or omissions of the CITY OF LANCASTER, its officers, employees, volunteers and authorized agents while performing services for the CITY OF LANCASTER to which the AVAQMD becomes a party, the CITY OF LANCASTER shall retain and bear all litigation costs of the AVAQMD and the CITY OF LANCASTER engendered by such litigation.

For the purposes of this section, negligent acts and omissions include, but are not limited to, the failure to lawfully perform the following: the adoption and implementation of rules, regulations, plans and policies; the issuance of permits; the issuance and management of grants and grant programs; the performance of duties under the California Environmental Quality Act Pub. Res. Code 21000 et seq.); and the enforcement of rules, regulations, and orders of either the AVAQMD or the CITY OF LANCASTER. Notwithstanding the foregoing the CITY OF LANCASTER staff will not be considered to be acting negligently if they properly carry out the rules, regulations, plans and policies adopted by AVAQMD. AVAQMD remains solely responsible for such rules, regulations, permit issuance, grant activities, plans and policies, as well as defending any third-party claim which challenges the enforceability and/or legality of same.

7. INSURANCE
Within thirty (30) days from the execution of this Agreement and for the term of this Agreement: the CITY OF LANCASTER will include the AVAQMD as an additional named insured on the CITY OF LANCASTER policies for workers’ compensation insurance, and employment practices insurance.

The AVAQMD shall obtain and maintain general liability insurance, property insurance, vehicle comprehensive and collision insurance, errors and omissions insurance, and other insurance as approved by the AVAQMD Governing Board at the expense of the AVAQMD.

In the event the AVAQMD directly obtains the services of officers and employees outside the scope of this Agreement the AVAQMD shall obtain and maintain workers’ compensation and employment practices insurance at the expense of the AVAQMD. Such additional insurance shall be obtained within thirty (30) days from the employment of officers or employees outside the scope of this Agreement. The AVAQMD will, as necessary, include the CITY OF LANCASTER as an additional named insured on such policies.

8. CONFLICT RESOLUTION
6 | P a g e
Conflicts regarding the terms, provisions, nature, scope, delivery, provision of specific services or materials, or arising as a result of the implementation of this Agreement shall be resolved in the following manner:

A. The chair of the Governing board of the AVAQMD (the “Chair”) or the Mayor of the CITY OF LANCASTER (the “Mayor”) shall contact the other, inform him or her of the nature and scope of the conflict and attempt to resolve the conflict.

B. If the Chair and Mayor cannot resolve the conflict by discussion, each shall place an item on the agenda of the next regularly scheduled meetings for their respective Governing Board/City Council, respectively, regarding the conflict and appointment of Governing Board/City Council members to a Conflict Resolution Committee.

C. The AVAQMD Governing Board and the CITY OF LANCASTER City Council shall each appoint two (2) members to the Conflict Resolution Committee.

D. The Conflict Resolution committee shall schedule a meeting to occur within fifteen (15) days of the later of the AVAQMD or the CITY OF LANCASTER Governing Board/City Council meeting at which members were appointed to the Conflict Resolution Committee. The Conflict Resolution Committee shall have fifteen (15) days from the date of the first meeting of the committee to attempt to resolve the conflict.

E. If the Conflict Resolution Committee fails to resolve the conflict within the time stated above, the matter shall be submitted to non-binding arbitration by either Party. Each Party agrees to bear one-half (1/2) the cost of obtaining such non-binding arbitration.

An impartial arbitrator shall be selected by alternately striking from a list provided by the California State Mediation and Conciliation Service who shall hear the matter and render a decision.

F. If either of the Governing Board/City Council elects not to accept the decision of the arbitrator at its next regularly scheduled meeting or the arbitrator fails to resolve the matter, either the AVAQMD or the CITY OF LANCASTER may terminate this Agreement in accordance with the terms set forth herein G. Each party reserves its rights and remedies to enforce the terms of this Agreement at law or in equity.

9. DUE DILIGENCE
Upon commencement of the term of this Agreement the CITY OF LANCASTER agrees to perform with due diligence the services specified herein.

10. EQUIPMENT
Equipment owned by the AVAQMD at the expiration or termination of this Agreement shall remain the property of the AVAQMD.
7 | P a g e
Equipment owned by the CITY OF LANCASTER prior to the expiration or termination of this Agreement but used in the performance of services under this Agreement shall remain the property of the CITY OF LANCASTER.

Equipment purchased and billed to the AVAQMD pursuant to the terms of this Agreement shall be the property of the AVAQMD.

The CITY OF LANCASTER agrees that upon expiration or termination of this Agreement, any property of the AVAQMD which is in the possession of the CITY OF LANCASTER shall be returned to the AVAQMD at a location designated by the AVAQMD within fifteen (15) days of the expiration or termination of this Agreement.

11. PROGRAM STAFF
The CITY OF LANCASTER will provide professional officers and employees of the CITY OF LANCASTER to perform the Services for AVAQMD pursuant to the terms of this Agreement. It is intended that the CITY OF LANCASTER will use both (a) existing CITY OF LANCASTER staff; and (b) staff which has been hired by the CITY OF LANCASTER solely to perform the Services (“Dedicated Staff”). All officers and employees of the CITY OF LANCASTER, including the Dedicated Staff, shall remain the officers and employees of the CITY OF LANCASTER. Notwithstanding the provisions of paragraph 4 above, the CITY OF LANCASTER shall remain solely responsible for the payment of all salaries and benefits, including but not limited to salary, health and dental benefits, employment related taxes and pension contributions (collectively, “Personnel Costs”), for its officers and employees when such officers and employees are performing the Services.

The duties which the officers and employees of the CITY OF LANCASTER may be required to perform for the AVAQMD pursuant to this Agreement shall conform to the job descriptions of such officers and employees in their duties with the CITY OF LANCASTER. For the purposes of this Agreement “job description” shall be the current and most recent job descriptions or as subsequently amended by the CITY OF LANCASTER for the CITY OF LANCASTER’s officers and employees.

Upon expiration or termination of this Agreement with the CITY OF LANCASTER, it is intended that the Dedicated Staff and its office location will be transitioned to AVAQMD. In the event the AVAQMD offers employment to such Dedicated Staff in the same or a similar capacity and subject to the personnel policies and procedures of the AVAQMD and other requirements as determined by the AVAQMD Governing Board, if any, AVAQMD will assume all Personnel Costs of the Dedicated Staff transferred to the AVAQMD employment on the transition date.

The CITY OF LANCASTER and AVAQMD will cooperate to transition any existing pension benefits to the extent permitted by applicable law. Following the expiration or termination, if services will be performed by a third-party contractor, then AVAQMD may request 1) that the third-party contractor offer position(s) to the Dedicated Employees; and 2) that the third-party contractor give priority offers of employment of same or similar positions to the Dedicated Employees. Notwithstanding the use of a third-party contractor, AVAQMD will remain 8 | P a g e
financially responsible for the assumption of all Personnel Costs for transferred staff as of the transition date.

In the event that AVAQMD or any third-party contractor employed by AVAQMD fails to transition the Dedicated Staff, then the CITY OF LANCASTER will continue to treat the Dedicated Staff in accordance with the CITY OF LANCASTER’s normal existing policies and procedures and Dedicated Staff will have the same rights and seniority in the same manner and to the same extent as the CITY OF LANCASTER staff who have not been dedicated to provide services to AVAQMD. Notwithstanding the foregoing, the CITY OF LANCASTER reserves the right to terminate Dedicated Staff if no position(s) are available and AVAQMD will be responsible for all reasonable costs and expenses incurred by the CITY OF LANCASTER in connection with such termination.

12. LEGISLATED POSITIONS
The Governing Board of the AVAQMD shall appoint an Air Pollution Control Officer (APCO) pursuant to H&S §41350(b); and legal counsel pursuant to H&S §41357.

13. OPERATIONAL OVERSIGHT
The CITY OF LANCASTER will provide the services of a Senior Manager to act in the capacity of the Air Pollution Control Officer (APCO)/Executive Director of AVAQMD. It is acknowledged and understood that the position of Executive Director is unique and that the person serving in this position must have the full confidence of the Governing Board of the AVAQMD. Accordingly, the Governing Board of the AVAQMD with a 75% majority will have the right, at any time, to request the removal of the Air Pollution Control Officer (APCO)/Executive Director or any replacement thereof from the position of Executive Director.

The replacement for the position of Executed Director will be subject to the review and approval of AVAQMD Governing Board and AVAQMD will be responsible for all costs incurred by the CITY OF LANCASTER to locate and hire any replacement. The initial Executive Director of AVAQMD will be Bret Banks. Any removal of Bret Banks from this position will result in his removal from employment with the CITY OF LANCASTER.

The Governing Board of the AVAQMD reserves the right to contract separately for operation oversight of the AVAQMD office. The CITY OF LANCASTER will provide reasonable access to its records and personnel for such oversight. Such third party hired for oversight may direct day to day operations under this Agreement as well as oversee actions of staff to provide services under this Agreement, however such third party shall not have the right to change the scope or nature of Services under this Agreement nor exercise any personnel related authority under the CITY OF LANCASTER’s policies and procedures including, but not limited to, performance reviews and discipline of CITY OF LANCASTER personnel. Nothing in this provision shall prevent either the AVAQMD Governing Board or any person contracted to provide operation oversight from providing input, advice and consultation regarding AVAQMD issues.
9 | P a g e

14. FEES, FINES, SUBVENTIONS, GRANTS AND OTHER REVENUE
All fees, fines, subventions, grants and other revenue owed to the AVAQMD pursuant to Federal, State or AVAQMD law, rule, regulation, permit or order of a State or Federal Court of competent jurisdiction shall be received by the AVAQMD. In the event that any such fee, fine, subventions, grants and other revenue owed to the AVAQMD is received by the CITY OF LANCASTER, it shall be transferred to the AVAQMD immediately upon receipt and shall not affect payments made under this Agreement.

15. CONTRACT PERFORMANCE
The CITY OF LANCASTER agrees to make and maintain all records that are required by Federal or State law or AVAQMD rule, regulation, permit or order or by an order of a State or Federal Court of competent jurisdiction and to transfer such records to the AVAQMD upon expiration or termination of this Agreement.

A Governing Board member of the respective Governing Boards of the AVAQMD and the CITY OF LANCASTER may attend any open session of Governing Board meetings of the other agency and any public meetings of the other agency which directly relate to the materials and services provided pursuant to this Agreement.

16. COPYRIGHT MATERIALS
The AVAQMD reserves the right to any copyrightable materials developed pursuant to this agreement. Upon acceptance of the copyrightable materials the AVAQMD shall have the right, title and interest including trade secret and copy right interest in the copyrightable materials.

During the term of this Agreement, the CITY OF LANCASTER shall have a non-exclusive right to use, copy and otherwise benefit from such materials.

17. FISCAL AUDIT
The AVAQMD shall designate an auditor and a fiscal audit shall be conducted annually by a qualified accountancy firm. The results of the audit shall be presented to the Governing Board on completion.

In the event this agreement expires or terminates, an audit shall be provided to the Governing Board of the AVAQMD within ninety (90) days of the expiration or termination of this Agreement.

The CITY OF LANCASTER agrees that the AVAQMD or its duly authorized representative shall have access and the right to examine, audit, excerpt, transcribe and copy the CITY OF LANCASTER’s financial records, documents, papers and records which are related or pertinent to this Agreement. Such materials shall be retained for a period of at least two (2) years 10 | P a g e
or such other longer period as required by State or Federal law, rule or regulation or by the CITY OF LANCASTER’s policies or procedures.

The AVAQMD agrees that the CITY OF LANCASTER or its duly authorized representative shall have access and the right to examine, audit, excerpt, transcribe and copy the AVAQMD’s financial records, documents, papers and records which are related or pertinent to this Agreement. Such materials shall be retained for a period of at least two (2) years or such other longer period as required by State or Federal law, rule or regulation or by AVAQMD’s policies or procedures.

18. PRIVILEGES AND IMMUNITIES
Pursuant to the provisions of Government Code 6513 and any other applicable law, all of the privileges and immunities from liability, exceptions from laws, ordinances and rules, all pension, relief, disability, workers’ compensation and other benefits which apply to the activity of officers, agents or employees of the CITY OF LANCASTER shall apply to the same degree and extent while such officers, agents or employees of the CITY OF LANCASTER are engaged in the performance of any of their functions and duties within the jurisdiction of the AVAQMD or the CITY OF LANCASTER.

19. SUCCESSORS
Neither party will assign or transfer any rights or obligations under this Agreement without the written consent of the other.

Each party and their successors, legal representatives and to the extent permitted herein, their assigns, are hereby bound to the other party and to the successors, legal representatives and the assigns of the other party in respect to all covenants, agreements and obligations of this Agreement.

20. AMENDMENT
This Agreement and its Exhibits, as amended from time to time in accordance with the terms of this Agreement, constitute the entire agreement between the Parties and will supersede all prior written or oral understandings. This Agreement and its Exhibits, as amended, may only be amended, supplemented and modified by an executed written instrument as approved the Governing Boards of the AVAQMD and the CITY OF LANCSTER. Notwithstanding the foregoing, the Governing Boards may specify a threshold for modifications to the Services and the Annual budget which are within the discretion of the General Managers of each entity.

For purposes of this Agreement, the annual adoption of the Annual Budget for each successive fiscal year until the expiration or termination of this Agreement as provided for in Paragraph 3 shall be deemed an amendment to Exhibit B of this Agreement upon mutual approval of the Annual Budget and its adoption by the Governing Board of the AVAQMD. 11 | P a g e

21. TERMINATION
The Governing Boards of the AVAQMD or the CITY OF LANCASTER may terminate this Agreement at any time by giving written notice to the other party 180 days in advance of the proposed termination, but not less than ninety (90) days before the effective date of the proposed termination.

In the event this Agreement is terminated, all finished and unfinished documents and other materials produced by the CITY OF LANCASTER pursuant to the terms of this Agreement shall be provided to the AVAQMD. If the Agreement is terminated by either party, the CITY OF LANCASTER shall be paid all amounts due and unpaid, whether or not such amounts had been billed to the AVAQMD, as of the date of the termination subject to the resolution of any disputed amounts pursuant to the conflict resolution procedure set forth in Section 8 above.

In the event this Agreement is terminated, AVAQMD Dedicated Staff will be transitioned in accordance with the terms of Section 11.

22. EFFECTIVE DATE
This Agreement shall be effective October 1, 2022 for the term specified in Section 2 above.

23. VENUE
The venue for any claims or actions brought related to or regarding this Agreement shall lie in the County of Los Angeles, California.

This Agreement is executed in the city of Lancaster, County of Los Angeles.

ANTELOPE VALLEY AIR QUALITY CITY OF LANCASTER

MANAGEMENT DISTRICT
BY: ____________________________ BY: __________________________ Bret Banks, APCO Jason Caudle, City Manager
DATED: _______________________ DATED: _______________________ 12 | P a g e
Approved as to Legal Form
_______________________________
Allison Burns, Special Counsel to
The Governing Board/City Council

END OF CONTRACT
2022-23
FISCAL
YEAR
BUDGET
July 1, 2022
Bret Banks, Executive Director
Antelope Valley Air Quality Management District
43301 Division St., Suite 206
Lancaster, CA 93535-4649
661.723.8070
avaqmd.ca.gov
.com/avaqmd
@avaqmd
HIGH
DESERT
of Los
Angeles
County
City of

LANCASTER
City of

PALMDALE
Pictured: Apollo Community Regional Park, Lancaster, Calif.

ADOPTED

____________________________________________________________________________________________________________________ City of

LANCASTER
City of

PALMDALE
County of

LOS ANGELES
Antelope Valley Air Quality Management District
Bret Banks, Executive Director
43301 Division St., Antelope Valley, CA 93535-4649
661.723.8070 • www.AVAQMD.ca.gov
Ap
ril 14, 2022
It
is my pleasure to present for your consideration, the Antelope Valley Air Quality Management District’s adopted Fiscal Year (FY) 2022-2023 General Fund Budget and Grant Programs. This budget is designed to serve as the financial plan for the District’s programs, projects, and policies. It reflects the District’s commitment to long-term financial planning, cost-effective services, and fiscal policies that recognize the need to fund future obligations.

The adopted budget for FY23 is optimistic. The COVID-19 pandemic took a significant toll on our local economy and changed how we financially prepare for the future. However, our conservative financial strategy assured the Districts success through this tumultuous economic period which includes an unprecedented inflation of 8.1%. The FY23 consolidated budget is $6.55 million with a General Fund budget of $3.69 million (up from FY22) by $.77 million dollars from funded programs. Recommendations include an increase to Regulation III, Fees, by proposing a 10.0% fee increase effective January 1, 2023.

The Antelope Valley AQMD is serviced based with 7 full time equivalents including one vacant FTE.

Additional administrative and technical services are provided by 2.5 FTEs through our contract for services with the Mojave Desert AQMD. As such, the General Budget is composed of Personnel expenses of 55%, Program expenses of 34%, Capital Expenses of 1%, and Operating Expenses of 10%.

A Public Hearing will be held May 17, 2022 to receive public comments concerning this adopted budget and will be continued to June 21, 2022 for adoption on July 1, 2022. The FY23 Budget represents a financial strategy designed to meet this year’s obligations and challenges, efficiently and transparently, while maintaining sensitivity towards industry and the general public.

Br
et Banks
Air Pollution Control Officer

2022-23FISCAL YEAR
661.723.8070 avaqmd.ca.gov .com/avaqmd @avaqmd
Table of CONTENTS
About the AVAQMD ......................................................... 01 AVAQMD Boundaries Map .......................................... 02 Governing Board ........................................................03 What we do at AVAQMD ..........................................04 All Funds Consolidated ......................................... 05 Cost Recovery FY 2022-23 ...................................06 General Fund Consolidated ............................... 08 General Fund Highlights ...................................09 General Fund Revenue Detail ......................... 11 Programs ...................................................... 12 District-wide Expenses ................................ 15 Support Staff ............................................. 17 Contract Expenses Detail ..........................18
Contract with Mojave Desert AQMD .... 20
AVAQMD Grants ..................................21
Program Funds Detail ........................23
All Funds Historical .......................... 27
Five-year Recap ............................. 28
General Fund Historical ............. 29
Reserves ...................................30
Budget Categories ...................31
Acronyms ............................... 32
Agenda and Resolution ........33

INTRODUCTION
The Antelope Valley Air Quality Management District (AVAQMD) relies on transparency and community involvement to educate industries, businesses and individuals about current air quality regulations and ensure compliance with local, state and federal regulations through annual inspections. The District approaches air quality regulations in a manner that is responsive and accessible. Growth and new programs demand that the District continue to strive to streamline government, become more efficient, and conserve resources without limiting or decreasing the service provided to the regulated community.

AVAQMD WEBSITE
Educating the community is the most important investment the District can make to impact the future of air quality in the region. Using technology and social media the District is able to reach the public with the latest version of the District rulebook, application for permits, various forms, and air quality information – such as forecasts, ozone maps and real time air quality data provided through Purple Air monitoring stations throughout the community

COMMUNITY OUTREACH
The District strives to be known as
a partner in the development of a
sustainable local economy that
values health and environmental
conservation. This is achieved by
providing information through
involvement in community events
such as the Antelope Valley
Economic Development and
Growth Enterprise’s Business
Outlook Conference, school
education programs, attendance
at regular meetings held by City
Councils, local business and
organizations.

The District lies within the northern part of Los Angeles County. The District boundaries start on the south just outside of Acton, north to the Kern County line, east to the San Bernardino County line, and west to the Quail Lake area. The AVAQMD is located within the Mojave Desert air basin. An air basin is a geographical region to describe an area with a commonly shared air mass, since air pollution does not follow county, city, or political boundaries.

ABOUT THE AVAQMD

Page 1 ends
Page 2 ends

GOVERNING Board
Marvin Crist
City of Lancaster
Austin Bishop
City of Palmdale
Newton Chelette
Public Member
Howard Harris
Los Angeles County,
Fifth District
Ron Hawkins
Los Angeles County,
Fifth District
Steven Hofbauer
City of Palmdale
Ken Mann
City of Lancaster
Chair Vice Chair
2022-23FISCAL YEAR
661.723.8070 avaqmd.ca.gov .com/avaqmd @avaqmd

Page 3 ends

 Adopt rules that limit pollution, issue permits to ensure compliance, and inspect pollution sources.  Administer agricultural burning and dust plans to preserve the air quality in Antelope Valley, protect public health and safety, and to ensure agricultural activity continues in a safe regulated fashion.  Inventory and assess the health risks of toxic air emissions.  Monitor the county's air quality through the use of an air quality monitoring station.  Administer the Motor Vehicle Emission Reduction Program funding projects which reduce air pollution from motor vehicles, and for related planning, monitoring, and enforcement activities.  Prepare Clean Air Plans to identify how much pollution is in our air, where it comes from, and how to control it most effectively.
 Analyze the air quality impact of new businesses and land development projects. Respond to public complaints and inquiries.
 Work with other government agencies to ensure their decisions & coordinate with good air quality programs.
 Help individuals and businesses understand and comply with federal, state, and local air pollution control laws.
 Inform the public about air quality conditions and health implications.  Issue permits to build, alter, and operate equipment to companies under our jurisdiction that either cause, contribute to, or control air pollution

WHAT WE DO

Page 4 ends

Antelope Valley AQMD
ALL FUNDS, Consolidated
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Revenues
Permit Fees 1,047,500 1,124,947 1,199,200
Application Fees 30,500 31,176 32,500
Federal Revenue 0 0 63,982
Fines & Penalties 10,000 14,250 10,000
Interest Income 17,500 19,909 44,602
Revenue from Programs 2,833,400 2,510,794 3,755,106
State Revenue 1,096,000 1,179,925 1,446,315
Total Revenues 5,034,900 4,881,001 6,551,705
Expenses
Personnel Expenses
Program Staff 1,389,000 1,532,974 1,800,000
Total Personnel Expenses 1,389,000 1,532,974 1,800,000
Operating Expenses
Communications 21,050 26,405 35,870
Dues & Subscriptions 46,650 19,050 21,100
Non-Depreciable Inventory 2,300 5,395 10,500
Legal 44,000 16,700 79,000
Professional Services 230,150 269,930 305,150
Maintenance & Repairs 6,500 4,700 7,000
Training & Travel 15,150 14,075 16,650
Vehicles 7,900 15,005 15,930
Office Expenses 110,125 109,701 132,761
Program Expenses 3,104,500 2,887,118 4,119,978
Miscellaneous Expenses 2,900 550 2,900
Total Operating Expenses 3,591,225
3,368,629 4,746,839
Capital Expenses
Equipment 25,000 15,120 25,000
Software 25,000 0 25,000
Total Capital Expenses 50,000
15,120 50,000
Total Expenses 5,030,225 4,916,723 6,596,839
Cash To (From) Reserves 4,675 (35,722) (45,134)

Page 5 ends

COST RECOVERY FISCAL YEAR 2022-2023

BACKGROUND
The District is responsible for protecting public health and the environment by achieving and maintaining health-based national and state ambient air quality standards which help with reducing public exposure to toxic air contaminants within our jurisdiction. Fulfilling this task involves reducing air pollutant emissions from sources of regulated air pollutants, and maintaining these emission reductions over time.

The District regulates and inventories criteria and toxic emissions and conducts regional scale air quality monitoring within our jurisdictional boundaries. The District’s air quality programs are primarily funded by revenue from regulatory fees, government grants and subventions.

OBJECTIVES

The cost of programs to address air pollution should be borne by the individuals and businesses that cause air pollution through regulatory and service fees. The primary authority for recovering the cost of District programs and activities related to stationary sources is given in Section 41240 of the Health and Safety Code(HSC). Using this guideline, the District must

 Recover the costs of programs related to permitted stationary sources  Recover the costs of programs related to area-wide and indirect sources of emissions which are regulated, but for which permits are not issued  Recover the costs of certain Hearing Board proceedings  Recover the costs related to programs that regulate toxic air contaminants

STUDY METHODOLOGY

The measure of the revenue that may be recovered through source fees is the full cost of all programs related to these sources, including all direct program costs, a commensurate share of indirect program costs, and overhead unless otherwise funded. It is the District’s practice that such fees are valid so long as they do not exceed the reasonable cost of the service or regulatory program for which the fee is charged, and are apportioned such that the costs allocated to each source bears a fair or reasonable relationship to its burden on, and benefits from, the regulatory system.

Page 6 ends

Cost accounting is the process of ascertaining, accumulating, and assigning the costs of District programs. It begins with a system of accounting that assigns costs directly to their cost centers.

By classifying each cost to its center, we are able to calculate whether program revenues are covering their associated costs.

Costs are classified as direct, indirect or overhead.

Direct costs can be associated directly with a particular program or activity such as permitting activities. Indirect costs are associated indirectly with a particular program or activity such as administrative activities or professional services. Overhead costs are those necessary for the general operation of the
District as a whole and are not
directly associated with a
particular program or activity
such as operating expenses.

Annually, the District’s direct,
indirect, and overhead rate are
established based on the prior
fiscal years audited financial
information. These rates are
used in determining fairly and
conveniently within the
boundaries of generally
accepted accounting
principles, what proportion of
costs each program
should bear. For the FY23 budget, the direct rate is 74%, the indirect rate is 18% and overhead is 8%.

The cost recovery process is designed so that individual program revenue adequately addresses expenses. Through the use of cost accounting, we analyze Permit Revenue and other programs for accuracy, appropriateness, and controls. Further, we evaluate the need for, and calculate the rate for fee increases to our Permitting Program based on 100% cost recovery. Permit Revenue for FY23 is $1.24M and covers 75% of the cost of permitting.

DIRECT 74%
INDIRECT 18%
OVERHEAD 8%

COST RECOVERY

Page 7 ends

Antelope Valley AQMD
GENERAL FUND, Consolidated
Budget
FY 2022
EOY Estimates
FY 2022
Budget
FY 2023
Revenues
Permit Fees 1,047,500 1,124,947 1,199,200
Application Fees 30,500 31,176 32,500
Federal Revenue 0 0 63,982
Fines & Penalties 10,000 14,250 10,000
Interest Income 15,000 9,922 10,000
Revenue from Programs 731,400 678,199 934,045
State Revenue 1,096,000 1,179,925 1,446,315
Total Revenues 2,930,400 3,038,419 3,696,042
Expenses
Personnel Expenses
Program Staff 1,389,000 1,532,974 1,800,000
Total Personnel Expenses 1,389,000 1,532,974 1,800,000
Operating Expenses
Communications 21,050 26,405 35,870
Dues & Subscriptions 46,650 19,050 21,100
Non-Depreciable Inventory 2,300 5,395 10,500
Legal 44,000 16,700 79,000
Professional Services 230,150 269,930 305,150
Maintenance & Repairs 6,500 4,700 7,000
Training & Travel 15,150 14,075 16,650
Vehicles 7,900 15,005 15,930
Office Expenses 110,125 109,700 132,761
Program Expenses 1,000,000 1,044,536 1,264,315
Miscellaneous Expenses 2,900 550 2,900
Total Operating Expenses 1,486,725
1,526,046 1,891,176
Capital Expenses
Equipment 25,000 15,120 25,000
Software 25,000 0 25,000
Total Capital Expenses 50,000
15,120 50,000
Total Expenses 2,925,725 3,074,140 3,741,176
Cash To (From) Reserves 4,675 (35,721) (45,134)

Page 8 ends

REVENUE
The greatest uncertainties facing Antelope Valley’s AQMD's budgetary outlook stem from the potential for major economic disruption due to the COVID-19 global pandemic. We recognize the hardships that many are experiencing. We are making accommodations in many program areas and remain committed to protecting public health and helping business.

The Antelope Valley AQMD staff
will monitor the financial
impacts and in the event that
there are major changes in the
economic landscape, we would
make adjustments to the FY23
Budget being proposed.

This budget includes a financial
summary of all revenues,
expenditures and staffing used
by each of Antelope Valley
AQMD's programs in the delivery
of essential services to clean the
air and to protect the health of all residents in the Antelope Valley AQMD through practical and innovative strategies.

The proposed General Fund budget for FY23 is not balanced budget with expenditures and revenues of $3.7M million and 9.5 full time equivalents (FTE) including one vacant FTE. The FY23 proposed budget is 22% percent more than the FY22 adopted budget of $2.9M. This is due in part to a 10% increase in fees effective January 1, 2023. Additionally, state and federally funded programs within the general fund are responsible for an additional $.6M in FY23.

Staff is proposing a budget for FY23 that allows the Antelope Valley AQMD programs to operate efficiently, transparently, and in a manner sensitive to public agencies, businesses and the public, while providing continued emission reductions and health benefit improvements.

GENERAL FUND

Page 9 ends

Recommendations include an increase
to Regulation III, Fees, by proposing a

10.0% fee increase effective January
1, 2023. Interest projections are a
conservative 1% due to current
market performance. Permit revenue
is 34% of general fund revenue.

Revenue from programs is 25% while
state and federal revenue is 41% of
general fund revenue.

EXPENSES
The Antelope Valley Air Quality
Management District is in a five year
contract for services with the Mojave
Desert Air Quality Management
District. Administrative and
operational services were contracted
in order to meet the regulatory responsibilities of an air quality management district for compensation consistent with all applicable laws and regulations.

The FY23 General Fund expenses are $3.7M including a Program staff budget of $1.8M.

Operating Expenses are $627k, Capital Expenses are $50k, and Program Expenses are $1.26M.

This is a 26% increase from the FY22 budget of $1M. The additional revenue is from the AB134 Community Air Protection Grant
Program revenue and is received from
the California Air Resources Board
(CARB).

Program staff is 30% more than FY22.

This is due to an increase of 2 FTEs, a
COLA of 5%, and other miscellaneous
benefit increases. Staffing costs
account for 55% of the General Fund
Budget.

PERMIT FEES
31% APPLICATION
FEES
2%

REVENUE
FROM

PROGRAMS
25%
STATE

REVENUE
38%

FEDERAL

REVENUE
2%

INTEREST

REVENUE
1%

FINES AND

PENALTIES
1%

GENERAL FUND REVENUE
Program
Staff
55%
Operating
Expenses
10%
Program
Expenses
34%
Capital Expenses
1%

GENERAL FUND EXPENSES

Page 10 ends

Antelope Valley AQMD
GENERAL FUND, Revenue Detail
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Revenues
Permit Fees
Permit Fees Rev 953,000 1,053,818 1,105,000
Asbestos Demo/Reno Rev 90,000 85,319 90,000
Title V Rev 4,500 4,000 4,200
Permit Fee Adjustments 0 (18,190) 0
1,047,500 1,124,947 1,199,200
Application Fees
Permit Application Fees 30,000 29,226 32,000
AG Application Fees 500 1,950 500
30,500
31,176 32,500
Fines & Penalties
Notice of Violations Fee 10,000 14,250 10,000
10,000
14,250 10,000
Interest Income
Interest Revenue 15,000 9,922 10,000
15,000
9,922 10,000
Other Revenue
Revenue from Programs
Administrative Funding 100,000 25,000 247,045
AB2766 Program 630,000 651,729 650,000
AB923 Program 0 0 36,000
Hot Spots 1,400 1,470 1,000
731,400 678,199 934,045
State and Federal Revenue
PERP Regulation 40,000 33,057 35,000
State Contracts 959,000 1,049,868 1,314,315
State Subvention 97,000 97,000 97,000
ARB PM 2.5 Section 103 0 0 63,982
1,096,000
1,179,925 1,510,297
Total General Fund Revenues 2,930,400 3,038,419 3,696,042

Page 11 ends

PROGRAM DESCRIPTIONS

U.S. Environmental
Protection Agency
The sets nationwide air quality and
emissions standards and oversees state
efforts and enforcement.

California Air Resources Board
Focuses on unique air quality challenges by
setting the state’s emissions standards for a
range of pollution sources including vehicles
,
fuels and consumer products.

COMUNICATIONS
The Antelope Valley Air Quality Management District conducts public information and education programs in order to educate businesses and residents in the Antelope Valley region about air pollution, its sources, health effects on humans, damage to the environment and the various programs offered by the Districts to reduce air emissions. Education is provided on methods of control and to encourage individual means of reducing pollution.

The programs are targeted to many audiences: academia, the general adult population, elementary to college level students, as well as business and industry. This information uses public workshops, conferences, presentations, social media and other multimedia promotions. In addition, press releases, press conferences and air quality forecasts are provided to the local media on an ongoing basis as a means of keeping the public informed.

The District operates an ambient air monitoring and meteorological network that tracks air quality trends within the Antelope Valley
region. The station is an active part
of the State and Local Air
Monitoring System (SLAMS)
network.

A computer operated data
acquisition system collects daily and
real time levels of pollutants. This
data is reported to the California Air
Resources Board (CARB), Federal
Environmental Protection Agency
(EPA), regulated industry and the
general public. This information is
also used to provide pollution
episode forecast and notification to
school systems and the general
population in the event of harmful
levels of pollution.

AVAQMD PROGRAMS

AIR QUALITY MONITORING PROGRAM

Page 12 ends

STATIONARY SOURCES

One of the District’s primary responsibilities is to process applications for permits in accordance with all applicable local, State, and Federal regulations. These permits are required for projects that propose industrial and/or commercial processes that have the potential to emit specific air contaminants. The wide range of requirements applied depends on the type and size of the proposed project.

District staff provides technical reviews of various documents, such as permit applications, manufacturer’s data, test reports, risk assessments, and emission inventory. The District implements and manages:

 Title III & V Programs. The Title III program is the federal toxic program specifically for Title V facilities. Title V (EPA Regulation) is a Federal Operating Permits Program required by the 1990 Clean Air Act. This program requires the District to develop and implement a Federal Permitting Program approved by the Environmental Protection Agency (EPA) for sources of a certain capacity.
 Emissions Inventory. This program maintains an active inventory of the sources of criteria air pollutants within the District and measures progress towards attainment and maintaining compliance with National and State Ambient Air Quality Standards. State and Federal Law require this program.
 Toxic Emissions Inventory. (Air Toxic "Hot Spot" Information and Assessment Act of 1987) This program assesses the amounts, types and health impacts of air toxics produced from stationary sources.

The District’s responsibility is to protect the health and welfare of the public by assisting the regulated community in complying with Federal, State and Local regulatory requirements. This responsibility is carried out through various programs and activities:
 Comprehensive annual inspections performed to verify compliance to air quality regulations and permit requirements.
 Investigation of citizen complaints pertaining to air related matters  Legal case development when necessary to address non-complying situations  Federal Asbestos Demolition and Renovation Program
 State-mandated Variance Program
 Continuous Emissions Monitoring Programs
 Reporting to the Environmental Protection Agency’s AIRS and Significant Violator programs  Source testing or stack sampling is the process that evaluates the emissions for industrial facilities to determine compliance with permit conditions.

COMPLIANCE

Page 13 ends

PLANNING & RULEMAKING
The District promulgates rules and plans in accordance with State and Federal planning requirements in order to achieve and maintain regional compliance with the ambient air quality standards. Planning staff serve as the District liaison with regional, State and Federal governments, ensuring District compliance with applicable requirements. Planning staff also performs California Environmental Quality Act (CEQA) review in the District's role as the expert agency for air quality. Staff in Planning and Rulemaking implement and maintain the following programs:

 California Ambient Air Quality Standards Attainment Planning, in the California Clean Air Act and subsequent state legislation. This program currently focuses on the California ozone standard.  National Ambient Air Quality Standards (NAAQS) in the Federal Clean Air Act, the Clean Air Act Amendments and subsequent Federal legislation. This program currently focuses on the National eight-hour ozone standard and the National 24-hour annual PM10 and PM 2.5 standards.
 Federal General and Transportation Conformity, entailing regional project review and comment.  California Environmental Quality Act (CEQA), requiring local and regional project review.

Page 14 ends

Antelope Valley AQMD
DISTRICT WIDE, Expense Detail
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Expenses
Personnel Expenses
Operating Expenses
Communications
Telephones 6,000 5,140 6,000
Long Distance Charges 500 320 500
Video/Teleconference 150 150 150
Internet 10,000 10,395 11,820
Web Hosting 2,400 2,400 2,400
Tech Support 2,000 2,000 10,000
Computers 0 6,000 5,000
21,050
26,405 35,870
Dues & Subscriptions
Memberships & Sponsorships 45,000 18,750 20,000
Publications & Subscriptions 800 300 500
Professional Dues 600 0 600
46,400
19,050 21,100
Non-Depreciable Inventory
Furniture & Fixtures Exp 100 220 2,500
Machinery & Equipment Exp 1,200 5,000 7,000
Safety Equipment Exp 1,000 170 1,000
2,300
5,390 10,500
Legal
Legal Notices 4,000 615 4,000
Legal Services 40,000 16,085 75,000
44,000
16,700 79,000
Professional Services
Payroll Contract 0 1,215 1,000
Research Studies 6,000 6,000 6,000
Consulting Fees 3,000 8,220 25,000
Stipends 8,400 8,400 8,400
17,400
23,835 40,400
Maintenance & Repairs
General Bldg. Maintenance 2,000 0 2,000
Custodial Services 3,000 2,700 3,000
Equipment Repair 1,500 2,000 2,000
6,500
4,700 7,000
Training & Travel
Training 4,500 5,000 4,500
Travel 8,000 9,000 12,000
Mileage 150 75 150
12,650
14,075 16,650

Page 15 ends

Antelope Valley AQMD
DISTRICT WIDE, Expense Detail
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Vehicles
Vehicle Gas & Oil 1,500 3,775 4,000
Vehicle Maintenance 2,000 2,000 2,000
Vehicle Repairs 3,000 3,000 3,000
Vehicle Insurance 1,400 5,680 6,930
7,900 14,455 15,930
Office Expenses
Software 1,300 2,000 25,000
Utilities 8,600 8,600 8,860
Supplies 3,000 3,000 3,000
Facility Leases 60,100 60,100 60,000
Equipment Lease 5,000 5,000 5,000
Postage 0 300 2,000
Courier 175 175 300
Printing/Shredding Services 1,350 1,350 1,350
Security 500 675 600
Liability Insurance 18,100 12,436 14,726
Meeting Expenses 1,000 1,225 1,225
Community Relations 9,500 9,500 9,500
108,625
104,361 131,561
Program Expenses
Program Expenditures 900,000 1,041,286 1,264,315
Program Expenditures Administrative 100,000 3,250 0
1,000,000
1,044,536 1,264,315
Miscellaneous Expenses
Bank Fees 2,900 550 2,900
2,900
550 2,900
Total Operating Expenses 1,269,725 1,274,057 1,625,226
Capital Expenses
Equipment 25,000 15,120 25,000
Software 25,000 0 25,000
Total Capital Expenses 50,000
15,120 50,000
Total Expenses 1,319,725 1,289,177 1,675,226

Page 16 ends

EXECUTIVE SERVICES
The Executive Office is responsible to the Governing Board for the general administration and coordination of all District operations and programs, including those programs mandated by the Federal Environmental Protection Agency and the California Air Resources Board. This office monitors state and federal legislation affecting the District and advises the Governing Board on actions required to protect the interests of the District.

The Governing Board, with seven members, meets monthly and members receive $100.00 stipend per meeting plus travel expenses. The Hearing Board, with six members, meets as needed and members may receive $100.00 stipend per meeting plus travel expenses.

Special Counsel to the Governing Board serves as general legal counsel to the Governing Board, the Air Pollution Control Officer and the District, providing general public agency legal services regarding the Brown Act, the Political Reform Act, California Environmental Quality Act, as well the Administrative Code, contracts, personnel matters, civil actions, and related litigation. District Counsel also provides legal advice and opinions on mandates specific to air districts such as the Federal Clean Air Act, California air pollution control laws and air quality rules and regulations. District Counsel exercises authority to bring civil actions in the name of the people of the State of California for violations of various air quality laws and regulations. The District Counsel also represents the District in actions brought before the Hearing Board.

ADMINISTRATIVE SERVICES
T
he Administrative Services office provides financial, administrative and personnel management services to the operating divisions of the District. Finance staff prepares the annual budget and controls expenditures by providing information regarding expenditures and the availability of budgeted funds. Finance also purchases equipment and supplies. Invoices for a variety of fees are issued, collected, deposited and accounted for through the Compliance and Permit System (CAPS).

This office also manages the District’s risk management, fleet and facility management, and fixed assets.

SUPPORT STAFF

LEGAL COUNSEL

Page 17 ends

Antelope Valley AQMD
CONTRACT, Expense Detail
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Expenses
Personnel Expenses
Program Staff 1,389,000 1,532,974 1,800,000
Total Personnel Expenses 1,389,000 1,532,974 1,800,000
Operating Expenses
Communications
Dues & Subscriptions
Publications & Subscriptions 250 0 0
250
0 0
Non-Depreciable Inventory
Safety Equipment Exp 0 5 0
0 5 0
Legal
Professional Services
Payroll Contract 125 200 250
Financial Services 212,625 245,895 264,500
212,750 246,095 264,750
Maintenance & Repairs
Training & Travel
Training 500 0 0
Travel 2,000 0 0
2,500 0 0

Page 18 ends

Antelope Valley AQMD
CONTRACT, Expense Detail
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Vehicles
Vehicle Gas & Oil 0 550 0
0 550 0
Office Expenses
Software 0 3,750 0
Supplies 500 450 0
Postage 1,000 1,000 1,000
Courier 0 140 200
1,500
5,340 1,200
Program Expenses
Miscellaneous Expenses
Total Operating Expenses 217,000 251,990 265,950
Capital Expenses
Total Expenses 1,606,000 1,784,964 2,065,950

Page 19 ends

PROGRAM STAFF: 19,760 HOURS • 9.5 FTE •1.80M

PERIOD JULY 1, 2022 – JUNE 30, 2023

TERMS AND CONDITIONS

The Antelope Valley Air Quality Management District contracts with the Mojave Desert Air Quality Management District for administrative and operations services as necessary to enable AVAQMD to meet the regulatory and legislated responsibilities of an air quality management district for compensation consistent with all applicable laws and regulations.

On March 15, 2022, the AVAQMD initiated the process of ending the 25 year contract for services with the MDAQMD with an effective date of September 30, 2022. After September 30, 2022, any services contracted by the AVAQMD, through the MDAQMD, could be considered on a temporary as needed basis.

This agreement is pursuant to the provisions of Title 1, Division 7, Chapter 5, Article 1 of the California Government Code (commencing with §6500).

CONTRACT
HOURS

The total
contracted
hours for
FY2023 is
19,760 The
Antelope Valley
AQMD office
located in
Lancaster, CA is
staffed by 6 full
time
equivalents
(FTE) with one
vacant FTE.

Additionally, 2.5 FTEs provide administrative, executive, air monitoring, permit engineering, and other technical services. O
n a monthly basis, the Mojave Desert
AQMD shall deliver to the Antelope Valley AQMD an itemized invoice for actual materials and services provided.

THE CONTRACT - MDAQMD
AVAQMD 14560
PERMIT ENGINEERING 2900
ADMINISTRATION 1250
EXECUTIVE 700
AIR MONITORING 350

Page 20 ends

AVAQMD GRANTS
AB2766

The District’s air quality programs are primarily funded by revenue from regulatory fees, government grants and subventions. The AB2766 program is funded through a $4 (four dollar) assessment by the District’s Governing Board, and collected by the California Department of Motor Vehicles on motor vehicle registrations. Calls for projects, eligibility determinations, and Governing Board award are all part of the process that makes funds available to the region for qualified emission reducing projects.

The FY23 AB2766 Program Budget is unchanged at $620k ; which represents 22% of all program revenue.

AB923

The District regulates and
inventories criteria and
toxic emissions and
conducts regional scale air
quality monitoring within
our jurisdictional
boundaries. Funds collected
under AB923 allows air
districts in state non-
attainment areas to adopt
an additional $2 (two dollar)
surcharge on motor vehicle
registration fees to be used
strictly for incentive-based emission reduction funding programs.

The use of the fees is limited to projects eligible for grants under the Carl Moyer Program, the purchase of school buses under the Lower-Emission School Bus Program, light-duty scrap or repair programs and unregulated agricultural sources. The FY23 AB923 Program Budget is $546k; which represents 19% of all program revenue.

Page 21 ends

CARL MOYER

The Moyer Program complements California’s regulatory program by providing incentives to obtain early or extra emission reductions, especially from emission sources in minority and low- income communities and areas disproportionately impacted by air pollution. Incentives encourage customers to purchase cleaner technologies, and stimulate the marketplace to manufacture cleaner technologies.

Although the Moyer Program has grown in scope, it retains its primary objective of obtaining cost-effective and surplus emission reductions to be credited toward California’s legally enforceable obligations in
the State Implementation
Plan (SIP) – California’s
road map for attaining
health-based national
ambient air quality
standards.

Carl Moyer Grant Program
Funds are distributed by
the California Air
Resources Board for
projects obligated by the
District under this state
regulated program.

Projects are awarded to
qualifying applicants on a
formula basis according to specific criteria and cost effectiveness. The FY23 Carl Moyer Program Budget is $1.5M compared to $800k in FY22; which represents 59% of all program revenue.

AB 2766
22%
AB 923
19%

CARL MOYER
59%

Page 22 ends

Antelope Valley AQMD
Program Funds Consolidated GRANT PROGRAMS
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Revenues
Administrative Funding 100,000 67,557 141,258
AB2766 Program 620,000 620,000 620,000
Carl Moyer Program Round 21 800,000 599,413 1,513,803
AB923 Program 582,000 545,625 546,000
Interest Revenue 2,500 9,987 34,602
Total Consolidated Program Revenue 2,104,500 1,842,582 2,855,663 Expenses
Program Expenditures 2,004,500 1,811,400 2,714,405
Program Expenditures Administrative 100,000 31,182 141,258 Total Consolidated Program Expense 2,104,500 1,842,582 2,855,663

Page 23 ends

Antelope Valley AQMD
Program Funds AB2766 GRANT PROGRAMS
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Revenues
AB2766 Program 620,000 620,000 620,000
Interest Revenue 500 0 0
Total AB2766 Program Revenue 620,500 620,000 620,000
Expenses
Program Expenditures 620,500 620,000 620,000
Total AB2766 Program Expense 620,500 620,000 620,000

Page 24 ends

Antelope Valley AQMD
Program Funds AB923 GRANT PROGRAMS
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Revenues
Administrative Funding 0 36,375 0
AB923 Program 582,000 545,625 546,000
Interest Revenue 1,500 0 0
Total AB923 Program Revenue 583,500 582,000 546,000
Expenses
Program Expenditures 583,500 582,000 546,000
Total AB923 Program Expense 583,500 582,000 546,000

Page 25 ends

Antelope Valley AQMD
Program Funds Carl Moyer GRANT PROGRAMS
Budget
FY 2022
EOY Estimate
FY 2022
Budget
FY 2023
Revenues
Administrative Funding 100,000 31,182 141,258
Carl Moyer Program 800,000 599,413 1,513,803
Interest Revenue 500 9,987 34,602
Total Carl Moyer Program Revenue 900,500 640,582 1,689,663 Expenses
Program Expenditures 800,500 609,400 1,548,405
100,000 31,182 141,258
Total Carl Moyer Program Expense 900,500 640,582 1,689,663

Page 26 ends

Antelope Valley AQMD
ALL FUNDS, Consolidated Historical
Budget
FY 2019
Budget
FY 2020
Budget
FY 2021
Budget
FY 2022
Budget
FY 2023
Revenues
Permit Fees 792,150 1,019,500 971,500 1,047,500 1,199,200 Application Fees 42,000 30,000 41,500 30,500 32,500
Federal Revenue 0 0 0 0 63,982
Fines & Penalties 59,000 62,000 63,000 10,000 10,000
Interest Income 14,300 22,435 58,000 17,500 44,602
Revenue from Programs 2,603,044 2,570,566 2,667,385 2,833,400 3,755,106 State Revenue 141,500 206,305 169,500 1,096,000 1,446,315 Total Revenues 3,651,994 3,910,806 3,970,885 5,034,900 6,551,705 Expenses
Personnel Expenses
Salaries & Wages 1,200,218 1,338,000 1,425,175 1,389,000 1,800,000 Total Personnel Expenses 1,200,218 1,338,000 1,425,175 1,389,000 1,800,000 Operating Expenses
Communications 23,500 20,500 18,500 21,050 35,870
Dues & Subscriptions 10,500 20,500 46,100 46,650 21,100 Non-Depreciable Inventory 11,000 10,000 1,000 2,300 10,500 Legal 19,000 19,000 19,000 44,000 79,000
Professional Services 207,650 217,400 217,400 230,150 305,150 Maintenance & Repairs 6,500 6,500 6,500 6,500 7,000
Training & Travel 11,000 10,150 12,150 15,150 16,650
Vehicles 12,000 10,000 5,500 7,900 15,930
Office Expenses 107,425 102,575 97,475 110,125 132,761
Program Expenses 1,753,826 2,060,266 2,036,085 3,104,500 4,119,978 Miscellaneous Expenses 800 915 1,000 2,900 2,900
Total Operating Expenses 2,163,201
2,477,806 2,460,710 3,591,225 4,746,839
Capital Expenses
Furniture & Fixtures 25,000 0 0 0 0
Equipment 0 40,000 40,000 25,000 25,000
Vehicles 30,000 30,000 20,000 0 0
Computers 35,000 0 0 0 0
Software 0 25,000 25,000 25,000 25,000
Total Capital Expenses 90,000
95,000 85,000 50,000 50,000
Total Expenses 3,453,419 3,910,806 3,970,885 5,030,225 6,596,839

Page 27 ends

Over the last 5 years, the Antelope Valley budget has focused on streamlining many of its operations while still meeting its program commitments despite new federal and state mandates and increased workload complexity. The focus has been, and continues to be, on reducing or maintaining
operating expenditure levels in
General Fund and maximizing the
efficient use of staff resources to
enable select vacant positions to
remain vacant, be deleted or be
unfunded whenever possible.

In FY19 the District began to
receive funding from the
California Resource Board
under AB 617 to reduce exposure
in neighborhoods most impacted
by air pollution as well as
funding under the AB 134 Community Air Protection Fund. Additionally, the Funding Agricultural Replacement Measures for Emission Reductions (FARMER) Program provides funding through local air districts for agricultural harvesting equipment, heavy-duty trucks, agricultural pump engines, tractors, and other equipment used in agricultural operations.

Permit Revenue is up 48% from FY19 as a result of strategic fee increases designed to measure the revenue that may be recovered through source fees against the full cost of providing the services. The cost of all programs related to these sources includes all direct program costs, a commensurate share of indirect program costs, and overhead unless otherwise funded. It is the District’s practice that such fees are valid so long as they do not exceed the reasonable cost of the service or regulatory program for which the fee is charged, and are apportioned such that the costs allocated to each source bears a fair or reasonable relationship to its burden on, and benefits from, the regulatory system. Revenue from General Fund Programs increased by 26% from FY2019 as a result of a state and federal funding.

Staffing costs increased by 30% from the FY22 budget commensurate with the increase in FTEs.

Excluding programs, Operating expenses have increased 29% since FY19. he rise in costs are the direct result of staffing increases of 30% recommendations for procedural changes to the Districts contract with the Mojave Desert AQMD.
5 YEAR BUDGET RECAP

Page 28 ends

Antelope Valley AQMD
GENERAL FUND, Consolidated Historical
Budget
FY 2019
Budget
FY 2020
Budget
FY 2021
Budget
FY 2022
Budget
FY 2023
Revenues
Permit Fees 792,150 1,019,500 971,500 1,047,500 1,199,200 Application Fees 42,000 30,000 41,500 30,500 32,500
Federal Revenue 0 0 0 0 63,982
Fines & Penalties 59,000 62,000 63,000 10,000 10,000
Interest Income 4,000 6,435 30,000 15,000 10,000
Revenue from Programs 774,300 611,300 659,300 731,400 934,045 State Revenue 141,500 206,305 169,500 1,096,000 1,446,315 Total Revenues 1,812,950 1,935,540 1,934,800 2,930,400 3,696,042 Expenses
Personnel Expenses
Salaries & Wages 1,100,000 1,338,000 1,425,175 1,389,000 1,800,000 Total Personnel Expenses 1,100,000 1,338,000 1,425,175 1,389,000 1,800,000 Operating Expenses
Communications 23,500 20,500 18,500 21,050 35,870
Dues & Subscriptions 10,500 20,500 46,100 46,650 21,100 Non-Depreciable Inventory 11,000 10,000 1,000 2,300 10,500 Legal 19,000 19,000 19,000 44,000 79,000
Professional Services 207,650 217,400 217,400 230,150 305,150 Maintenance & Repairs 6,500 6,500 6,500 6,500 7,000
Training & Travel 11,000 10,150 12,150 15,150 16,650
Vehicles 12,000 10,000 5,500 7,900 15,930
Office Expenses 107,425 102,575 97,475 110,125 132,761
Program Expenses 15,000 85,000 0 1,000,000 1,264,315
Miscellaneous Expenses 800 915 1,000 2,900 2,900
Total Operating Expenses 424,375
502,540 424,625 1,486,725 1,891,176
Capital Expenses
Furniture & Fixtures 25,000 0 0 0 0
Equipment 0 40,000 40,000 25,000 25,000
Vehicles 30,000 30,000 20,000 0 0
Computers 35,000 0 0 0 0
Software 0 25,000 25,000 25,000 25,000
Total Capital Expenses 90,000
95,000 85,000 50,000 50,000
Total Expenses 1,614,375 1,935,540 1,934,800 2,925,725 3,741,176

Page 29 ends

FINANCIAL RESERVES

It is the policy of the Governing Board of the Antelope Valley Air Quality Management District (District) to direct the Air Pollution Control Officer (APCO) to establish and maintain certain fund balances to ensure the sound fiscal management of District resources.

The purposes of the District’s fund balance policy include maintaining prudent level of financial resources to protect against reducing service levels or raising fees because of temporary revenue shortfalls or unpredicted one-time expenditures. Another purpose is to reserve funds for unanticipated large expenditures, such as capital expenses; or extraordinary costs associated with defending the District’s regulatory activities.

CLASSIFICATION OF FUNDS

Restricted Fund Balance is designated for the specific purposes stipulated by the external source, government code, enabling legislation, or other legal restriction. Following are an example of this classification: Mobile Emission Reduction Revenue (AB 2766), Incentive Based Emission Reduction Funding (AB 923), and Carl Moyer Grant Program Funds. These funds are held in separate trust accounts and are reported separate from the District’s General Fund.

Committed Fund Balance is designated by policy and includes amounts that can be used only for the specific purposes determined by a formal action of the Governing Board. Commitments may be changed only by action of the Governing Board. The District’s Operating Cash Reserves is an example of this classification. The FY23 Cash Reserves are $1M or 27% of the annual operating Budget.

Assigned Fund Balance is used to describe the portion of the fund balance that reflects the intended use of resources; the intent being established by the Governing Board, or the Board’s designee. Such fund balance will be allocated and defined in the District’s annual adopted budget. The District’s Budget Stabilization Reserves is an example of this classification.

Page 30 ends

REVENUES
Permit Fees
Permit Fees Rev Operating and Annual Renewal Permit Fees Asbestos Demo/Reno Rev Fees for Permits related to Asbestos Removal - Rule 302 Title V Permit Rev Permit fees for Federal Permit Program Application Fees
ERC Application Fees Emission Reduction Credit
New Source Review Project Evaluation for Complex Source-Rule 301 Permit Application Fees Filing of new permits and permit changes Variance Filing Fees Filing fee for each petition to District Hearing Board -Rule 303 AG Application Fee
Fine & Penalties
Excess Emissions Fees Fee charged when a variance is granted by Hearing Board - Rule 303 Notice of Violations Fees Fee Charged for unpermitted source, or violation of permit condition Interest Revenue Interest on funds held on deposit, all funds Revenue from Programs
Administrative Funding Program pass thru funds for administration costs of the program AB2766 Program Revenue received through DMV vehicle registration California Clean Air Act Fees State mandated fee collected on behalf of Carb Hot Sports State mandated fee: "Air Toxic "Hot Spot"
State Revenue
PERP State Funds Portable Engine Registration Program
State Subvention Funds received from state budget to supplement Permitting and Air Monitoring

EXPENSES
Program Staff Contracted costs to provide staff for District operations Operating Expenses
Communications Telephones, teleconferencing, internet, cable, hosting, tech support Dues & Subscriptions District memberships, sponsorships, publications, subscriptions Non-Depreciable Inventory Furniture, equipment, machinery, and safety equipment < $5,000 Legal Legal services for Governing Board, Hearing Board; publications Professional Services Financial services, audit, research studies, consulting fees, stipends Maintenance & Repairs General building maintenance, custodial services, and repairs Training and Travel Employee training; professional development and related travel Vehicles Fuel and oil, maintenance and repair, insurance for District's fleet Office Expenses Software, utilities, supplies, leases, postage, courier, printing and shredding services, security, insurance, meeting expenses and community relations

PROGRAM EXPENSES

Expenses attributable to the use of special funds
CAPITAL EXPENSES Furniture & fixtures, Equipment, vehicles, computers, and software over $5K

BUDGET CATEGORIES

Page 31 ends

AB2766 Enabling legislation for collection of fees for mobile source reduction projects AIRS Aerometric Information Retrieval System
APCD Air Pollution Control District
APCO Air Pollution Control Officer
AQMD Air Quality Management District
ARB Air Resources Board
AVAQMD Antelope Valley Air Quality Management District
BACT Best Available Control Technology
CAA Clean Air Act
CAPCOA California Air Pollution Control Officers Association CAPP Clean Air Patrol Program
CAPS Compliance and Permit System (permit tracking database) CARB California Air Resources Board
CNGVG California Natural Gas Vehicle Coalition
CRE Community Relations and Education
CREEC California Regional Environmental Education Community CSDA California Special Districts Association
DAPCO Deputy Air Pollution Control Officer
EPA Environmental Protection Agency
ERC Emission Reduction Credit
FY Fiscal Year
ICTC Interstate Clean Transportation Corridor
MACT Maximum Achievable Control for Toxics
MEEC Mojave Environmental Education Consortium
MDAQMD Mojave Desert Air Quality Management District
MOU Memorandum of Understanding
NAAQS National Ambient Air Quality Standards
NESHAP National Emissions Standard for Hazardous Pollutants NSPS New Source Performance Standards
OPEB Other Post Employment Benefits
PARS Public Agency Retirement Services
PERP Portable Equipment Registration Program
PSD Prevention of Significant Deterioration
PTBS Permit Tracking and Billing System
SDRMA Special Districts Risk Management Authority
SLAMS State and Local Air Monitoring Stations
TAC Technical Advisory Committee
VPN Virtual Private Network

ACRONYMS

Page 32 ends

STAFF REPORT
City of Lancaster
CC 13
8/9/2022
JC
Date: August 9, 2022
To: Mayor Parris and City Council Members
From: Jeff Hogan, Senior Director - Development Services Larissa De La Cruz, Senior Manager – Community Development Matthew Simons, Senior Traffic Engineer
Subject: Adoption of an Ordinance to Establish Speed Limits on 135 Roadway Segments and Amend Section 10.04.020 of the Lancaster Municipal Code Recommendation:

Adopt Ordinance No. 1091, establishing speed limits on 135 roadway segments in the City of Lancaster, and amending Section 10.04.020 of the Lancaster Municipal Code (LMC).

Fiscal Impact:

None.

Background:

The proposed ordinance is to adopt speed limits on the selected 135 roadway segments in the City of Lancaster, as determined by the attached 2022 Spot Speed Survey and Analysis (Study).

The Study was performed in accordance with the provisions of the California Vehicle Code (CVC) Section 627 and Assembly Bill (AB 43), and as recommended by the California Department of Transportation Manual on Uniform Traffic Control Devices (CA-MUTCD).

Sections 22357 and 22358 of the CVC require that certain local speed limits be determined based upon the Engineering and Traffic Survey (E&TS) reports, and that these speed limits are established by local ordinance.

Section 40802 of the CVC requires that the E&TS studies be conducted every five years where enforcement of the speed limit involves the use of a radar device, which measures the speed of moving vehicles.

The five-year application of the survey findings can be extended to seven years if the officer using the radar/laser device is properly certified in its use, and, if the used electronic device was calibrated within three years of the alleged violations. Additionally, the E&TS studies can be 1 0
0 4
extended for three more years if a registered engineer determines that no significant changes have occurred on the roadway after the seven-year period. However, the recent passage of the Assembly Bill 43 (AB 43) could extend the application of E&TS studies to 14 years, if evaluated by a registered engineer.

The adoption of the E&TS report is vital to the continued use of radar or laser enforcement.

Without a valid study, the Los Angeles County Superior Court will not uphold speeding violations issued by the Los Angeles County Sheriff’s Department in which radar or laser enforcement are utilized. In addition, if radar or laser are not used, the Sheriff’s Department must rely on less effective alternatives, such as pacing speeding offenders. Effective radar or laser enforcement will promote the orderly movement of vehicles, reduce collisions, and enhance safety for all road users. The current Citywide E&TS report was adopted in March 2017. The Study includes 269 road segments and actual speed surveys performed from 2014 to 2016, some of which are nearing expiration and require updates. City staff has been conducting E&TS studies for the past three years; the remaining 135 roadway segments in this study will complete the update of the speed limits for all road segments in the City of Lancaster.

Speed limits at 128 road segments were updated in 2019 and 2020. The remaining 135 roadway segments in this Study are nearing the seven-year expiration date. Thus, they require an update of the speed limits through an E&TS study.

Spot speed survey and analysis were conducted by LSY Enterprise, Inc., from October 2021 to January 2022, under the supervision of a registered traffic engineer in the State of California. An individual E&TS survey summary and calculation sheet for spot speed surveys and supporting information are provided in the E&TS Report, 2022 (Exhibit A of the Ordinance).

Amendments to the LMC
The Lancaster Municipal Code Section 10.04.020 (D) identifies speed limits and references the E&TS report. The proposed amendment would include an update to this section and reflect the current study. The section would be amended as follows:

D. Speed Limits

10. The speed limits, as recommended in the E&TS Report 2022, incorporated herein by reference, are hereby established.

Summary and Conclusions
Based on the E&TS study for the 135 roadway segments, staff recommends speed limits to be decreased for 16 roadway segments, increased for one roadway segment, and re-established the current speed limits for 118 roadway segments. The E&TS Report, 2022 details the existing roadway segments with recommended new speed limits (Exhibit A of the Ordinance).

DECREASES TO EXISTING SPEED LIMITS
1 0
0 4
At the Lancaster City Council meeting on July 26, 2022, the City Council approved the introduction of an Ordinance to Establish Speed Limits on 135 Roadway Segments and Amend Section 10.04.020 of the Lancaster Municipal Code, by the following vote: 3-0-0-2; Ayes: Malhi, Mann, Crist; Noes: None; Abstain: None; Absent: Parris, Dorris Attachment:

Ordinance No. 1091
Exhibit A: Engineering and Traffic Survey (E&TS) Report, 2022

2 6
2 8
ORDINANCE NO. 1091

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF

LANCASTER, CALIFORNIA, ESTABLISHING SPEED LIMITS
ON 135 STREET SEGMENTS IN THE CITY OF LANCASTER,
AND AMENDING SECTION 10.04.020 OF THE LANCASTER

MUNICPAL CODE
WHEREAS, Sections 22357 and 22358 of the California Vehicle Code require that certain local speed limits be determined based upon engineering and traffic surveys; and, WHEREAS, once established, speed limits shall not thereafter be revised except upon the basis of an engineering and traffic survey; and,
WHEREAS, speed limits shall be established by local ordinance; and, WHEREAS, Section 40802 of the California Vehicle Code requires that the engineering and traffic surveys be conducted within five, seven or ten years, depending on certain qualifications, prior to the date of an alleged violation; and, WHEREAS, enforcement of the speed limits involves the use of radar or other electronic devices that measure the speed of moving objects; and
WHEREAS, the City has conducted the engineering and traffic surveys, compiled in the Engineering and Traffic Survey Report dated 2022, which is on file in the office of the City Clerk and incorporated herein by reference.

THE CITY COUNCIL OF THE CITY OF LANCASTER, CALIFORNIA, DOES HEREBY ORDAIN, AS FOLLOWS:

Section 1. Section 10.04.020 of the Lancaster Municipal Code is hereby amended by adding Line No. 10.

D. Speed Limits

10. The speed limits, as recommended in the Engineering and Traffic Survey Reports dated 2022, incorporated herein by reference, are hereby established.

Section 2. That the City Clerk shall certify to the passage of this Ordinance, and will see that it is published and posted in the manner required by law.

Section 3. This Ordinance shall become effective 30 days after its adoption. 2 6
2 8
I, Andrea Alexander, City Clerk of the City of Lancaster, do hereby certify that the foregoing ordinance was regularly introduced and placed upon its first reading on the ______day of ______, 2022, and placed upon its second reading and adoption at a regular meeting of the City Council on the _______ day of ________, 2022, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

ATTEST: APPROVED:
_____________________________ ______________________________ ANDREA ALEXANDER R. REX PARRIS
City Clerk Mayor
City of Lancaster City of Lancaster

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF LANCASTER )

CERTIFICATION OF ORDINANCE CITY COUNCIL
I, __________________________ , ___________________________ City of Lancaster, CA, do hereby certify that this is a true and correct copy of the original Ordinance No. 1091, for which the original is on file in my office.

WITNESS MY HAND AND THE SEAL OF THE CITY OF LANCASTER, on this _________ day of ________________ , ________.
(seal)
_____________________________
Exhibit A.

Engineering and
Traffic Survey (E&TS)
Report, 2022

1. Speed Survey Segment List and Speed Limit Recommendations

2. Spot Speed Survey Summary

3. Spot Speed Survey Data Calculation Sheet

4. Radar Device Certification (Kustom Falcon HR)
This report is prepared by Andrew Yi, PE, TE, PTOE, a Professional Traffic Engineer in the State of California.

1. Speed Survey Segment List and
Speed Limit Recommendations
1 of
Road Section Street Location Posted Recommended
ID Speed Limit Speed Limit
1 Avenue G 50th West to 25th West 55 55
2 Avenue G-8 30th West to East End 45 45
3 Avenue G-12 7th Street West to Sierra Highway 40 40
4 Avenue H 35th West to 30th West 55 55
8 Avenue H-2 - 25th St West Ave H to 23rd West 40 35
9 Avenue H-8 Division to 5th East 45 40
10 15th East to 20th East 35 30
12 Avenue I 30th West to 27th West 55 55
17 10th West to Sierra Highway 40 40
23 20th East to 30th East 50 50
24 30th East to 40th East 55 50
25 Lancaster Boulevard 35th West to 30th West 40 40
26 30th West to 25th West 50 50
31 Yucca to Division 30 30
38 Milling Avenue Yucca to Division 40 40
40 Avenue J 60th West to 50th West 55 55
41 50th West to 40th West 50 50
44 25th West to 20th West 40 40
45 20th West to 15th West 40 40
46 15th West to 10th West 40 40
53 20th East to 30th East 50 50
55 Avenue J-8 65th West to 57h West 40 40
57 50th West to 45th West 50 50
58 45th West to 40th West 50 50
59 40th West to 35th West 45 45
60 35th West to 30th West 45 45
61 30th West to 20th West 45 45
66 Challenger Way to 15th East 45 45
67 15th East to 20th East 45 45
72 Avenue K 70th West to 60th West 55 55
73 60th West to 50th West 55 55
74 50th West to 45th West 45 45
80 25th West to 20th West 50 50
81 20th West to 17th West 40 40
82 17th West to 15th West 40 40
83 15th West to 10th West 35 30
91 20th East to 30th East 50 50
92 30th East to 35th East 50 50
Lancaster Speed Survey Segment List/Speed Recommendation City of Lancaster - Speed limit segments and recommendation 2 of
93 35th East to 40th East 50 50
94 Commerce Center Drive 12th West to 10th West 30 30
95 Avenue K-4 10th West to Gadsden 35 35
96 Division to 5th East 30 30
97 Avenue K-6 Divison to 5th East 30 30
98 Avenue K-8 62nd West to 60th West 40 40
99 35th West to 30th West 45 45
103 Divison to 5th East 45 45
104 5th East to Challenger 40 40
109 Avenue L 30th West to 20th West 50 50
110 20th West to 15th West 50 50
111 15th West to 10th West 50 50
112 10th West to Sierra Highway 55 55
113 Sierra Highway to Challenger 55 55
114 30th East to 35th East 55 55
115 Avenue L-8 75th West to 70th West 45 45
116 67th West to 60th West 50 50
118 40th West to 35th West 50 50
119 35th West to 30th West 45 45
120 30th West to 26th West 35 35
121 10th West to 6th West 40 40
125 Avenue M 20th West to 15th West 55 55
126 15th West to 10th West 55 55
129 Avenue M-8 45th West to 40th West 50 45
130 40th West to 35th West 50 45
132 65th Street West Avenue J to Avenue J-8 55 45
133 Avenue J-8 to Avenue J-12 45 45
134 Avenue L to Avenue L-8 45 45
135 60th Street West Avenue I to Avenue J 55 55
143 45th Street West Avenue J to Avenue J-8 45 45
144 Avenue J-8 to Avenue K 45 45
147 40th Street West Avenue M-8 to Avenue N 45 45
148 35th Street West Avenue H to North End 30 30
149 Lancaster to North End 35 35
150 Lancaster to Avenue J 40 40
151 Avenue J to Avenue J-12 40 40
153 Avenue K-8 to Avenue L 45 45
154 Avenue L to Avenue L-8 40 45
155 Avenue L-8 to Avenue M 45 45
156 30th Street West Avenue G to Avenue G-8 55 55
157 Avenue G-8 to Avenue H 55 55
City of Lancaster - Speed limit segments and recommendation 3 of
166 27th Street West Avenue I to Lancaster 45 45
174 23rd Street West Avenue H-2 to Avenue I 45 45
181 20th Street West Avenue L to Avenue M 50 50
182 17th Street West Avenue J-12 to Avenue K 35 35
183 Avenue K to Avenue K-8 40 40
192 13th Street West Avenue K to 12th West 30 30
193 12th Street West Avenue K to Commerce Center 30 30
194 10th Street West Avenue H to Avenue H-8 50 50
195 Avenue H-8 to Avenue I 45 45
196 Avenue I to Lancaster 40 40
197 Lancaster to Avenue J 40 40
198 Avenue J to Avenue J-8 40 40
199 Avenue J-8 to Avenue K 45 45
200 Avenue K to Avenue K-8 50 45
201 Avenue K-8 to Avenue L 50 45
202 Avenue L to Avenue M 50 50
203 7th Street West Avenue G-12 to Avenue H 40 40
204 6th Street West Avenue L-8 to Avenue M 40 40
205 Gadsden Avenue Avenue K to Avenue K-8 35 35
214 Yucca Avenue Avenue I to Lancaster 40 40
215 Lancaster to Milling 40 35
216 Trevor Avenue Avenue H to Avenue I 40 40
225 Business Center Parkway Avenue K-8 to Avenue L 50 45 226 3rd Street East Avenue I to Lancaster 35 35
227 4th Street East Avenue L to Avenue M 45 45
232 5th Street East Avenue K to Avenue K-8 40 40
240 15th Street East Avenue H-12 to Avenue I 35 35
241 Avenue I to Lancaster 45 45
242 Lancaster to Avenue J 45 45
243 Avenue J to Avenue J-8 45 45
244 Avenue J-8 to Avenue K 45 45
245 Avenue K to Avenue K-8 50 45
246 20th Street East Avenue H to Avenue I 55 55
247 Avenue I to Lancaster 50 50
248 Lancaster to Avenue J 50 50
249 Avenue J to Avenue J-8 50 50
250 Avenue J-8 to Avenue K 50 50
251 Avenue K to Avenue L 55 55
252 25th Street East Avenue H-8 to Avenue I 40 40
253 Avenue I to Lancaster 45 45
254 Lancaster to Avenue J 45 45
City of Lancaster - Speed limit segments and recommendation 4 of
255 Avenue J to Avenue J-4 40 40
256 Avenue J-8 to Avenue K 40 40
257 Avenue K to Avenue K-4 35 35
258 26th Street East Avenue H-8 to Avenue I 35 35
259 30th Street East Avenue I to Lancaster 50 45
260 Lancaster to Avenue J 50 45
261 Avenue J to Avenue J-8 50 50
262 Avenue J-8 to Avenue K 50 50
263 Avenue K to Avenue K-8 55 55
264 Avenue K-8 to Avenue L 55 55
265 35th Street East Avenue H-8 to Avenue I 40 35
266 Avenue J-8 to Avenue K 40 40
267 Avenue K to Avenue K-8 50 50
268 Avenue K-8 to Avenue L 50 50
269 40th Street East Lancaster to Avenue J 50 50
City of Lancaster - Speed limit segments and recommendation

2. Spot Speed Survey Summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue G From/To: 50th W - 25th W
Survey date: 11/2/2021 Survey hours: 9:15A - 10:00A
Location of survey: at Great Western Dr

SPEED DATA
50th Percentile Speed 55 Post Speed Limit 55 mph
85th Percentile Speed 61 Recommended Speed Limit 55 mph 10 mph Pace Speed 49-58 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 64.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 0.27
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 2,573
Traffic Control Type

ROADWAY CHARACTERISTICS
Segment Length (feet) 14,050
Number of Lanes 6
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Vacant
Comments
Keep existing speed limit
1ID:

Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue G-8 From/To: 30th St W - East End
Survey date: Survey hours:

Location of survey:

SPEED DATA
50th Percentile Speed Post Speed Limit 45 mph
85th Percentile Speed Recommended Speed Limit 45 mph
10 mph Pace Speed Speed limit Justification
Percentage of Vehicles in Pace

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 50
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,480
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks S/S
Vertical/Horizontal Curves None
Adjacent Land use Industrial /Vacant
Comments
Keep the existing speed limit, No traffic and an entrance to a RV park

ID: 2
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue G-12 From/To: 7th St W - Sierra Hwy
Survey date: 11/17/2021 Survey hours: 7:50A -8:50A / 2:05P-2:35P Location of survey: 400' e/o 7th St

SPEED DATA
50th Percentile Speed 36 Post Speed Limit 40 mph
85th Percentile Speed 41 Recommended Speed Limit 40 mph 10 mph Pace Speed 30-39 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 71.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 1,050
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,060
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Industrial /Vacant
Comments
ID: 3
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue H From/To: 35th W - 30th W
Survey date: 11/2/2021 Survey hours: 11:10A-12:00P
Location of survey: at 32nd St W

SPEED DATA
50th Percentile Speed 54 Post Speed Limit 55 mph
85th Percentile Speed 59 Recommended Speed Limit 55 mph 10 mph Pace Speed 50-59 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 74.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 2,079
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,699
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Vacant
Comments
ID: 4
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue H-2/25th St W From/To: Ave H - 23rd W
Survey date: 12/1/2021 Survey hours: 2:45P-3:45P
Location of survey: 400' e/o 25th St W

SPEED DATA
50th Percentile Speed 34 Post Speed Limit 40 mph
85th Percentile Speed 38 Recommended Speed Limit 35 mph 10 mph Pace Speed 30-39 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 92.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 6,405
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,640
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves 90 Curve
Adjacent Land use Vacant
Comments
Decrease speed limit
ID: 8
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue H-8 From/To: Division - 5th E
Survey date: 10/20/2021 Survey hours: 11:30A-12:35P
Location of survey: at 3rd St E

SPEED DATA
50th Percentile Speed 38 Post Speed Limit 45 mph
85th Percentile Speed 42 Recommended Speed Limit 40 mph 10 mph Pace Speed 33-42 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 76.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 0.58
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 6,090
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,714
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
Decrease speed limit
ID: 9
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue H-8 From/To: 15th E - 20th E
Survey date: 11/2/2021 Survey hours: 12:45P-1:30P
Location of survey: at Fairbanks Ave

SPEED DATA
50th Percentile Speed 26 Post Speed Limit 35 mph
85th Percentile Speed 29 Recommended Speed Limit 30 mph 10 mph Pace Speed 20-29 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 89.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 1,050
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,645
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Vacant
Comments
Decrease speed limit
ID: 10
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue I From/To: 30th W - 27th W
Survey date: 11/2/2021 Survey hours: 12:05P-12:40P
Location of survey: 500' w/o 27th St W

SPEED DATA
50th Percentile Speed 52 Post Speed Limit 55 mph
85th Percentile Speed 59 Recommended Speed Limit 55 mph 10 mph Pace Speed 45-54 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 65.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.25
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 13,046
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,460
Number of Lanes 8
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Vacant /Industrial
Comments
ID: 12
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue I From/To: 10th W - Sierra Hwy
Survey date: 10/20/2021 Survey hours: 9:00A-9:30A
Location of survey: e/o Fern

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 44 Recommended Speed Limit 40 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 88.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 51
Collision Rate (ACC/MVM) 3.34
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 23,678
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 3,107
Number of Lanes 6
Street Classification Major
Median/Type Painted
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
High collision rate
ID: 17
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue I From/To: 20th E - 30th E
Survey date: 10/20/2021 Survey hours: 9:40A-10:40A
Location of survey: w/o 25th St E

SPEED DATA
50th Percentile Speed 47 Post Speed Limit 50 mph
85th Percentile Speed 52 Recommended Speed Limit 50 mph 10 mph Pace Speed 44-53 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 76.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 22
Collision Rate (ACC/MVM) 1.86
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 10,684
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,326
Number of Lanes 3 (1E/ 2W)
Street Classification Major
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
ID: 23
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue I From/To: 30th E - 40th E
Survey date: 10/20/2021 Survey hours: 10:45a-11:15a
Location of survey: at 3233 Ave I

SPEED DATA
50th Percentile Speed 50 Post Speed Limit 55 mph
85th Percentile Speed 55 Recommended Speed Limit 50 mph 10 mph Pace Speed 45-54 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 64.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 6
Collision Rate (ACC/MVM) 1.28
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 4,226
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,366
Number of Lanes 3 (1E /2W)
Street Classification Major
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential /Vacant / School
Comments
Decrease speed limit, High collision rate, Continuation of speed

ID: 24
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Lancaster Boulevard From/To: 35th W - 30th W
Survey date: 12/1/2021 Survey hours: 4:00p-4:30p
Location of survey: e/o 32nd St W

SPEED DATA
50th Percentile Speed 39 Post Speed Limit 40 mph
85th Percentile Speed 42 Recommended Speed Limit 40 mph 10 mph Pace Speed 34-43 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 89.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 1.38
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 5,040
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,780
Number of Lanes 4
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential /School
Comments
ID: 25
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Lancaster Boulevard From/To: 30th W - 25th W
Survey date: 10/20/2021 Survey hours: 9:30a-10:10a
Location of survey: at Shadowcrest Dr

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 54 Recommended Speed Limit 50 mph 10 mph Pace Speed 45-54 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 80.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 0.52
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 10,102
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,769
Number of Lanes 4
Street Classification Secondary
Median/Type Raised
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential / Vacant
Comments
ID: 26
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Lancaster Boulevard From/To: Yucca - Division
Survey date: 10/21/2021 Survey hours: 1:20p-2:20p
Location of survey: e/o Trevor Ave

SPEED DATA
50th Percentile Speed 29 Post Speed Limit 30 mph
85th Percentile Speed 33 Recommended Speed Limit 30 mph 10 mph Pace Speed 25-34 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 88.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 3.7
Expected Collision Rate (ACC/MVM) 1.32

TRAFFIC FACTORS
Average Daily Traffic 2,625
Traffic Control Type traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,985
Number of Lanes 4
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
ID: 31
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Milling Avenue From/To: Yucca - Division
Survey date: 10/20/2021 Survey hours: 12:40p-1:40p
Location of survey: at Trevor Ave

SPEED DATA
50th Percentile Speed 38 Post Speed Limit 40 mph
85th Percentile Speed 42 Recommended Speed Limit 40 mph 10 mph Pace Speed 33-42 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 89.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.62
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 5,854
Traffic Control Type traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,319
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential /Vacant
Comments
ID: 38
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J From/To: 60th W - 50th W
Survey date: 10/20/2021 Survey hours: 3:30p-4:00p
Location of survey: at 55th St W

SPEED DATA
50th Percentile Speed 55 Post Speed Limit 55 mph
85th Percentile Speed 60 Recommended Speed Limit 55 mph 10 mph Pace Speed 52-61 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 68.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 0.38
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 7,245
Traffic Control Type traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,288
Number of Lanes 3-4
Street Classification Major
Median/Type Raised /Painted
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Prison/ Vacant/ Residential
Comments
Keep existing speed limit
ID: 40
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J From/To: 50th W - 40th W
Survey date: 10/20/2021 Survey hours: 4:05p-4:35P
Location of survey: at 45th St W

SPEED DATA
50th Percentile Speed 50 Post Speed Limit 50 mph
85th Percentile Speed 56 Recommended Speed Limit 50 mph 10 mph Pace Speed 47-56 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 74.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 9
Collision Rate (ACC/MVM) 0.7
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 11,760
Traffic Control Type traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,270
Number of Lanes 3 (1W /2E)
Street Classification Major
Median/Type Raised /Painted
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit
ID: 41
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J From/To: 25th W - 20th W
Survey date: 10/20/2021 Survey hours: 10:15a-10:45a
Location of survey: at Valley Center Way

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 45 Recommended Speed Limit 40 mph 10 mph Pace Speed 37-46 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 77.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 49
Collision Rate (ACC/MVM) 3.03
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 28,613
Traffic Control Type traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,724
Number of Lanes 6
Street Classification Major
Median/Type Raised/ Painted
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Residential
Comments
Keep existing speed limit, High collision rate, Continuation of speed

ID: 44
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J From/To: 20th W - 15th W
Survey date: 10/20/2021 Survey hours: 10:50a-11:20a
Location of survey: at 17th St W

SPEED DATA
50th Percentile Speed 41 Post Speed Limit 40 mph
85th Percentile Speed 45 Recommended Speed Limit 40 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 84.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 100
Collision Rate (ACC/MVM) 6.38
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 28,245
Traffic Control Type traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,675
Number of Lanes 4
Street Classification Major
Median/Type Raised
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Residential
Comments
Keep existing speed limit, High collision rate, Continuation of speed ID: 45
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J From/To: 15th W - 10th W
Survey date: 10/20/2021 Survey hours: 11:25a-11:55a
Location of survey: at Loneoak Ave

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 45 Recommended Speed Limit 40 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 81.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 62
Collision Rate (ACC/MVM) 4.55
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 24,780
Traffic Control Type traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,654
Number of Lanes 4
Street Classification Major
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential /Vacant
Comments
Keep existing speed limit, High collision rate, Continuation of speed ID: 46
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J From/To: 20th E - 30th E
Survey date: 10/27/2021 Survey hours: 10:50a-11:20a
Location of survey: at 25th St E

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 54 Recommended Speed Limit 50 mph 10 mph Pace Speed 46-55 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 79.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 25
Collision Rate (ACC/MVM) 2.84
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 8,006
Traffic Control Type traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,305
Number of Lanes 2-3
Street Classification Major
Median/Type Raised/ None
Bicycle lanes/Type No
Sidewalks S/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 53
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J-8 From/To: 65th W - 57th W
Survey date: 10/28/2021 Survey hours: 10:30a-11:40a
Location of survey: at 62nd St W

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 46 Recommended Speed Limit 40 mph 10 mph Pace Speed 37-46 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 84.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.07
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 16,590
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 4,374
Number of Lanes 4
Street Classification Major
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ School
Comments
Keep existing speed limit
ID: 55
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J-8 From/To: 50th W - 45th W
Survey date: 10/20/2021 Survey hours: 2:50p-3:25p
Location of survey: at 47th St W

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 56 Recommended Speed Limit 50 mph 10 mph Pace Speed 44-53 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 62.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,205
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,630
Number of Lanes 4
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential / Vacant
Comments
Keep existing speed limit
ID: 57
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J-8 From/To: 45th W - 40th W
Survey date: 10/20/2021 Survey hours: 2:15p-2:45p
Location of survey: 1000' e/o 45th St W

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 53 Recommended Speed Limit 50 mph 10 mph Pace Speed 44-53 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 75.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 1.46
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 4,988
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,642
Number of Lanes 4
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
ID: 58
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J-8 From/To: 40th W - 35th W
Survey date: 10/20/2021 Survey hours: 1:40p -2:10p
Location of survey: at 37th St W

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 50 Recommended Speed Limit 45 mph 10 mph Pace Speed 42-51 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 70.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 1.79
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 5,775
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,396
Number of Lanes 2
Street Classification Secondary
Median/Type Painted/ None
Bicycle lanes/Type Class II
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use School/ Residential/Vacant
Comments
Keep existing speed limit, High collision rate
ID: 59
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J-8 From/To: 35th W - 30th W
Survey date: 10/20/2021 Survey hours: 12:40p -1:20p
Location of survey: at 32nd St W

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 50 Recommended Speed Limit 45 mph 10 mph Pace Speed 40-49 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 75.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 6
Collision Rate (ACC/MVM) 1.88
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 5,775
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,664
Number of Lanes 4
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use College/ Residential
Comments
Keep existing speed limit, High collision rate
ID: 60
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J-8 From/To: 30th W - 20th W
Survey date: 10/20/2021 Survey hours: 12:05p-12:35p
Location of survey: 500' e/o 25th St W

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 50 Recommended Speed Limit 45 mph 10 mph Pace Speed 42-51 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 75.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 25
Collision Rate (ACC/MVM) 1.5
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 14,805
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,415
Number of Lanes 4
Street Classification Secondary
Median/Type Painted/ Raised
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Commercial
Comments
Keep existing speed limit, High collision rate
ID: 61
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J-8 From/To: Challenger Way - 15th E
Survey date: 10/21/2021 Survey hours: 9:00a-9:30a
Location of survey: e/o Palm Vista

SPEED DATA
50th Percentile Speed 42 Post Speed Limit 45 mph
85th Percentile Speed 47 Recommended Speed Limit 45 mph 10 mph Pace Speed 37-46 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 64.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 1.08
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 6,720
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,663
Number of Lanes 2
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Commercial
Comments
ID: 66
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue J-8 From/To: 15th E - 20th E
Survey date: 10/21/2021 Survey hours: 2:30p-3:00p
Location of survey: at 17th St E

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 40-49 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 72.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 1.61
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 3,360
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,675
Number of Lanes 2
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ School
Comments
ID: 67
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 70th W - 60th W
Survey date: 10/22/2021 Survey hours: 10:00a-10:30a
Location of survey: near 65th St W

SPEED DATA
50th Percentile Speed 54 Post Speed Limit 55 mph
85th Percentile Speed 61 Recommended Speed Limit 55 mph 10 mph Pace Speed 48-57 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 69.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 11
Collision Rate (ACC/MVM) 3.49
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 2,888
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,269
Number of Lanes 2-4
Street Classification Major
Median/Type None/ Raised
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Vacant/ Residential
Comments
Keep existing speed limit, High collision rate
ID: 72
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 60th W - 50th W
Survey date: 10/22/2021 Survey hours: 10:35a-11:05a
Location of survey: near 55th St W

SPEED DATA
50th Percentile Speed 55 Post Speed Limit 55 mph
85th Percentile Speed 62 Recommended Speed Limit 55 mph 10 mph Pace Speed 51-60 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 61.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 10
Collision Rate (ACC/MVM) 1.26
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 7,245
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,295
Number of Lanes 2
Street Classification Major
Median/Type None/ Raised
Bicycle lanes/Type Class II
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Vacant/ Residential
Comments
Keep existing speed limit, High collision rate
ID: 73
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 50th W - 45th W
Survey date: 10/22/2021 Survey hours: 11:08a-11:38a
Location of survey: 500' w/o 45th St W

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 53 Recommended Speed Limit 45 mph 10 mph Pace Speed 40-49 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 66.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 0.64
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 8,663
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (Feet) 2,594
Number of Lanes 2-3
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant/ School
Comments
Keep existing speed limit, school traffic
ID: 74
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 25th W - 20th W
Survey date: 10/22/2021 Survey hours: 11:45a-12:15p
Location of survey: at Westfield Estates

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 55 Recommended Speed Limit 50 mph 10 mph Pace Speed 44-53 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 71.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 14
Collision Rate (ACC/MVM) 0.9
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 27,878
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,686
Number of Lanes 4-6
Street Classification Major
Median/Type Painted
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Commercial
Comments
Keep existing speed limit
ID: 80
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 20th W - 17th W
Survey date: 10/22/2021 Survey hours: 12:25p-12:50p
Location of survey: at Century 21 Parking lot

SPEED DATA
50th Percentile Speed 36 Post Speed Limit 40 mph
85th Percentile Speed 43 Recommended Speed Limit 40 mph 10 mph Pace Speed 32-41 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 56.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 26
Collision Rate (ACC/MVM) 2.98
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 31,290
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,344
Number of Lanes 6
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
ID: 81
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 17th W - 15th W
Survey date: 10/22/2021 Survey hours: 1:00p-1:30p
Location of survey: 700' e/o 17th St W

SPEED DATA
50th Percentile Speed 34 Post Speed Limit 40 mph
85th Percentile Speed 40 Recommended Speed Limit 40 mph 10 mph Pace Speed 31-40 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 57.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 32
Collision Rate (ACC/MVM) 2.25
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 39,900
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,717
Number of Lanes 6
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
ID: 82
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 15th W - 10th W
Survey date: 10/22/2021 Survey hours: 1:35p-2:00p
Location of survey: at 12th St W

SPEED DATA
50th Percentile Speed 27 Post Speed Limit 35 mph
85th Percentile Speed 33 Recommended Speed Limit 30 mph 10 mph Pace Speed 21-30 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 76.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 71
Collision Rate (ACC/MVM) 5.02
Expected Collision Rate (ACC/MVM) 1.73

TRAFFIC FACTORS
Average Daily Traffic 29,505
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,313
Number of Lanes 6
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
Decrease speed limit
ID: 83
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 20th E - 30th E
Survey date: 10/22/2021 Survey hours: 2:10p-2:35p
Location of survey: at 25th St E

SPEED DATA
50th Percentile Speed 50 Post Speed Limit 50 mph
85th Percentile Speed 56 Recommended Speed Limit 50 mph 10 mph Pace Speed 46-55 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 71.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 8
Collision Rate (ACC/MVM) 0.52
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 13,939
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,342
Number of Lanes 4-5
Street Classification Major
Median/Type Painted
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Keep existing speed limit, continuation of speed
ID: 91
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 30th E - 35th E
Survey date: 10/22/2021 Survey hours: 2:38p-3:00p
Location of survey: at 32nd St E

SPEED DATA
50th Percentile Speed 48 Post Speed Limit 50 mph
85th Percentile Speed 54 Recommended Speed Limit 50 mph 10 mph Pace Speed 45-54 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 67.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 5
Collision Rate (ACC/MVM) 1.09
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 8,164
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,711
Number of Lanes 4
Street Classification Major
Median/Type Painted
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Continuation of speed
ID: 92
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K From/To: 35th E - 40th E
Survey date: 10/22/2021 Survey hours: 3:05p-3:30p
Location of survey: at Devyn

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 55 Recommended Speed Limit 50 mph 10 mph Pace Speed 45-54 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 71.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 0.63
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 5,775
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,670
Number of Lanes 2
Street Classification Major
Median/Type Painted/ None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Keep existing speed limit, continuation of speed
ID: 93
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Commerce Center Drive From/To: 12th W - 10th W
Survey date: 11/10/2021 Survey hours: 10:10a-10:45a
Location of survey: at Sol Plaza

SPEED DATA
50th Percentile Speed 30 Post Speed Limit 30 mph
85th Percentile Speed 34 Recommended Speed Limit 30 mph 10 mph Pace Speed 26-35 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 86.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 3.41
Expected Collision Rate (ACC/MVM) 1.32

TRAFFIC FACTORS
Average Daily Traffic 1,050
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,347
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves Horizontal
Adjacent Land use Commercial
Comments
ID: 94
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K-4 From/To: 10th W - Gadsden
Survey date: 10/27/2021 Survey hours: 1:50p-2:40p
Location of survey: at Midpoint

SPEED DATA
50th Percentile Speed 35 Post Speed Limit 35 mph
85th Percentile Speed 40 Recommended Speed Limit 35 mph 10 mph Pace Speed 32-41 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 81.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 7
Collision Rate (ACC/MVM) 24.1
Expected Collision Rate (ACC/MVM) 1.32

TRAFFIC FACTORS
Average Daily Traffic 1,050
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,334
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
Keep existing speed limit, high collision rate
ID: 95
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K-4 From/To: Division - 5th E
Survey date: 2/16/2022 Survey hours: 10:30a-11:30a
Location of survey: at Copland

SPEED DATA
50th Percentile Speed 31 Post Speed Limit 30 mph
85th Percentile Speed 36 Recommended Speed Limit 30 mph 10 mph Pace Speed 27-36 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 75.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 5.15
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 1,050
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,675
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
Keep existing speed limit, high collision rate
ID: 96
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K-6 From/To: Division - 5th E
Survey date: 10/27/2021 Survey hours: 1:00p-1:35p
Location of survey: at 251 Ave K-6

SPEED DATA
50th Percentile Speed 30 Post Speed Limit 30 mph
85th Percentile Speed 37 Recommended Speed Limit 30 mph 10 mph Pace Speed 25-34 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 76.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 6.87
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 1,050
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,675
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
Keep existing speed limit, high collision rate
ID: 97
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K-8 From/To: 62nd W- 60th W
Survey date: 12/15/2021 Survey hours: 9:30a-10:45a
Location of survey: 300' w/o 60th St W

SPEED DATA
50th Percentile Speed 39 Post Speed Limit 40 mph
85th Percentile Speed 43 Recommended Speed Limit 40 mph 10 mph Pace Speed 34-43 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 82.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 1,470
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,138
Number of Lanes 2
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
Low volume road and the street ends at 62nd St West
ID: 98
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K-8 From/To: 35th W - 30th W
Survey date: 10/27/2021 Survey hours: 3:17p-4:10p
Location of survey: at 33rd St W

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 40-49 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 79.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 1.1
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 4,988
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,634
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
ID: 99
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K-8 From/To: Division - 5th E
Survey date: 10/27/2021 Survey hours: 11:25a-12:20p
Location of survey: at Market Pl

SPEED DATA
50th Percentile Speed 43 Post Speed Limit 45 mph
85th Percentile Speed 48 Recommended Speed Limit 45 mph 10 mph Pace Speed 37-46 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 66.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 1.41
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,634
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,605
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
ID: 103
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue K-8 From/To: 5th E - Challenger
Survey date: 10/27/2021 Survey hours: 9:15a-10:46a
Location of survey: at 8th St E

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 44 Recommended Speed Limit 40 mph 10 mph Pace Speed 35-44 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 78.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 1.19
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 1,507
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,680
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
ID: 104
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L From/To: 30th W - 20th W
Survey date: 10/22/2021 Survey hours: 1:00p-1:30p
Location of survey: 500' w/o 22nd St W

SPEED DATA
50th Percentile Speed 50 Post Speed Limit 50 mph
85th Percentile Speed 56 Recommended Speed Limit 50 mph 10 mph Pace Speed 46-55 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 73.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 25
Collision Rate (ACC/MVM) 0.77
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 29,085
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,353
Number of Lanes 4-6
Street Classification Major
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Keep existing speed limit, Continuation of speed
ID: 109
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L From/To: 20th W -15th W
Survey date: 10/22/2021 Survey hours: 1:35p-2:05p
Location of survey: at 17th St W

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 56 Recommended Speed Limit 50 mph 10 mph Pace Speed 44-53 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 72.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 16
Collision Rate (ACC/MVM) 1.03
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 27,773
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,687
Number of Lanes 5-6
Street Classification Major
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Keep existing speed limit, Continuation of speed
ID: 110
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L From/To: 15th W - 10th W
Survey date: 11/17/2021 Survey hours: 8:45a-9:10a & 3:00p-3:20p Location of survey: w/o Ramp SR-14

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 50 mph
85th Percentile Speed 49 Recommended Speed Limit 50 mph 10 mph Pace Speed 41-50 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 81.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 56
Collision Rate (ACC/MVM) 2.76
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 36,435
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,687
Number of Lanes 6-8
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
Continuation of speed
ID: 111
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L From/To: 10th W - Sierra Hwy
Survey date: 10/22/2021 Survey hours: 2:10p-2:40p
Location of survey: e/o 6th St W

SPEED DATA
50th Percentile Speed 55 Post Speed Limit 55 mph
85th Percentile Speed 60 Recommended Speed Limit 55 mph 10 mph Pace Speed 49-58 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 67.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 49
Collision Rate (ACC/MVM) 1.51
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 29,925
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,213
Number of Lanes 5-6
Street Classification Major
Median/Type Raised/ Painted
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Vacant
Comments
Keep existing speed limit, Continuation of speed
ID: 112
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L From/To: Sierra Hwy - Challenger
Survey date: 10/22/2021 Survey hours: 3:35p-4:05p
Location of survey: at 5th St E, Business Pkwy

SPEED DATA
50th Percentile Speed 53 Post Speed Limit 55 mph
85th Percentile Speed 57 Recommended Speed Limit 55 mph 10 mph Pace Speed 48-57 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 82.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 21
Collision Rate (ACC/MVM) 1.64
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 11,288
Traffic Control Type Traffic signal/Roundabout

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,472
Number of Lanes 2-4
Street Classification Major
Median/Type Painted/ None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves Vertical
Adjacent Land use Industrial/ Vacant
Comments
Continuation of speed
ID: 113
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L From/To: 30th E - 35th E
Survey date: 10/22/2021 Survey hours: 2:50p-3:30p
Location of survey: at Soccer Center

SPEED DATA
50th Percentile Speed 51 Post Speed Limit 55 mph
85th Percentile Speed 56 Recommended Speed Limit 55 mph 10 mph Pace Speed 47-56 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 76.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 736
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,650
Number of Lanes 2
Street Classification Major
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Vacant/ Lancaster Science Center
Comments
Continuation of speed
ID: 114
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L-8 From/To: 75th W - 70th W
Survey date: 10/22/2021 Survey hours: 11:45a-12:48p
Location of survey: at Round Hill Dr

SPEED DATA
50th Percentile Speed 43 Post Speed Limit 45 mph
85th Percentile Speed 48 Recommended Speed Limit 45 mph 10 mph Pace Speed 38-47 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 74.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,415
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,528
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 115
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L-8 From/To: 67th W - 60th W
Survey date: 10/22/2021 Survey hours: 10:40a-11:40a
Location of survey: at Maytern Ave

SPEED DATA
50th Percentile Speed 46 Post Speed Limit 50 mph
85th Percentile Speed 54 Recommended Speed Limit 50 mph 10 mph Pace Speed 43-52 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 60.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 4,461
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 3,922
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
ID: 116
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L-8 From/To: 40th W - 35th W
Survey date: 10/22/2021 Survey hours: 10:03a-10:35a
Location of survey: 300 e/o 37th St W

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 56 Recommended Speed Limit 50 mph 10 mph Pace Speed 42-51 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 69.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 4,095
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,708
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks S/S
Vertical/Horizontal Curves None
Adjacent Land use Vacant/ School
Comments
Keep existing speed limit, Continuation of speed
ID: 118
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L-8 From/To: 35th W - 30th W
Survey date: 10/22/2021 Survey hours: 9:25a-10:00a
Location of survey: at 32nd St W

SPEED DATA
50th Percentile Speed 46 Post Speed Limit 45 mph
85th Percentile Speed 50 Recommended Speed Limit 45 mph 10 mph Pace Speed 42-51 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 69.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 6
Collision Rate (ACC/MVM) 3.05
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 3,465
Traffic Control Type Traffic signal/Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,739
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks S/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ School/ Vacant
Comments
Keep existing speed limit
ID: 119
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L-8 From/To: 30th W - 26th W
Survey date: 12/15/2021 Survey hours: 3:10p-4:10p
Location of survey: 400' e/o 28th St W

SPEED DATA
50th Percentile Speed 32 Post Speed Limit 35 mph
85th Percentile Speed 40 Recommended Speed Limit 35 mph 10 mph Pace Speed 26-35 Speed limit Justification
Percentage of Vehicles in Pace 70.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 1,050
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,976
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks N/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Low volume road and keep existing speed limit
ID: 120
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue L-8 From/To: 10th W - 6th W
Survey date: 10/27 & 11/17/2021 Survey hours: 2:45p-3:10p / 3:30p-4:00p Location of survey: 500' e/o 10th St W

SPEED DATA
50th Percentile Speed 36 Post Speed Limit 40 mph
85th Percentile Speed 42 Recommended Speed Limit 40 mph 10 mph Pace Speed 32-41 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 67.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,317
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,952
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks N/S
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
ID: 121
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue M From/To: 20th W - 15th W
Survey date: 10/28/2021 Survey hours: 3:53p-4:25p
Location of survey: at 1611 Ave M

SPEED DATA
50th Percentile Speed 54 Post Speed Limit 55 mph
85th Percentile Speed 58 Recommended Speed Limit 55 mph 10 mph Pace Speed 50-59 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 82.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.13
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 14,018
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,695
Number of Lanes 2
Street Classification Major
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Vacant/ Residential
Comments
ID: 125
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue M From/To: 15th W - 10th W
Survey date: 11/10/2021 Survey hours: 11:30a-12:00p
Location of survey: 1000' w/o SR-14

SPEED DATA
50th Percentile Speed 54 Post Speed Limit 55 mph
85th Percentile Speed 58 Recommended Speed Limit 55 mph 10 mph Pace Speed 50-59 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 76.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 12
Collision Rate (ACC/MVM) 0.98
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 21,840
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,691
Number of Lanes 2-4
Street Classification Major
Median/Type None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Vacant
Comments
ID: 126
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue M-8 From/To: 45th W - 40th W
Survey date: 10/28 & 12/15/2021 Survey hours: 1:50p-2:50p / 8:20a-9:30a Location of survey: at 42nd St W

SPEED DATA
50th Percentile Speed 42 Post Speed Limit 50 mph
85th Percentile Speed 48 Recommended Speed Limit 45 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 72.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 2.42
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 1,523
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,614
Number of Lanes 2
Street Classification Secondary
Median/Type Painted/ None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Decrease speed limit
ID: 129
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Avenue M-8 From/To: 40th W - 35th W
Survey date: 1/5 & 1/18/2022 Survey hours: 10:45a-11:45a /7:40a-8:20a Location of survey: at 38th St W

SPEED DATA
50th Percentile Speed 41 Post Speed Limit 50 mph
85th Percentile Speed 47 Recommended Speed Limit 45 mph 10 mph Pace Speed 36-45 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 63.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 1,050
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,667
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks S/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Decrease speed limit
ID: 130
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 65th Street West From/To: Ave J - Ave J-8
Survey date: 1/5 & 1/18/22 Survey hours: 3:10p-4:10p /9:15a-10:00a Location of survey: 500 s/o Ave J

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 55 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 39-48 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 67.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 2.31
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 788
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,653
Number of Lanes 3
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Decrease speed limit
ID: 132
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 65th Street West From/To: Ave J-8 - Ave J-12
Survey date: 1/5/2022 Survey hours: 2:00p-2:40p /4:15p-4:45p Location of survey: 500' s/o Ave J-8

SPEED DATA
50th Percentile Speed 38 Post Speed Limit 45 mph
85th Percentile Speed 43 Recommended Speed Limit 45 mph 10 mph Pace Speed 30-39 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 70.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 194
Traffic Control Type

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,322
Number of Lanes 3
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Continuation of speed
ID: 133
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 65th Street West From/To: Ave L - Ave L-8
Survey date: 1/5/2022 Survey hours: 12:55p-1:55p
Location of survey: at Ave L-4

SPEED DATA
50th Percentile Speed 41 Post Speed Limit 45 mph
85th Percentile Speed 46 Recommended Speed Limit 45 mph 10 mph Pace Speed 37-46 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 71.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 2.08
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 891
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,605
Number of Lanes 2-3
Street Classification Secondary
Median/Type TWLT/ None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ School
Comments
ID: 134
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 60th Street West From/To: Ave I - Ave J
Survey date: 10/28/2021 Survey hours: 11:45a-12:20p
Location of survey: 1000' s/o State Prison

SPEED DATA
50th Percentile Speed 54 Post Speed Limit 55 mph
85th Percentile Speed 60 Recommended Speed Limit 55 mph 10 mph Pace Speed 52-61 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 73.9%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 0.63
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 5,723
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,332
Number of Lanes 3
Street Classification Major
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Vacant
Comments
Keep existing speed limit, Continuation of speed
ID: 135
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 45th Street West From/To: Ave J - Ave J-8
Survey date: 10/28/2021 Survey hours: 12:25p-1:05p
Location of survey: at Ave J-4

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 40-49 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 80.9%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.7
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,625
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,622
Number of Lanes 2
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 143
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 45th Street West From/To: Ave J-8 - Ave K
Survey date: 10/28/2021 Survey hours: 1:08p-1:40p
Location of survey: at Ave J-10

SPEED DATA
50th Percentile Speed 43 Post Speed Limit 45 mph
85th Percentile Speed 48 Recommended Speed Limit 45 mph 10 mph Pace Speed 38-47 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 71.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 1.12
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 3,255
Traffic Control Type Traffic signal/Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,646
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ School
Comments
ID: 144
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 40th Street West From/To: Ave M-8 - Ave N
Survey date: 1/5 & 1/18/2022 Survey hours: 11:47a-12:47p / 8:25a-9:00a Location of survey: n/o Derby

SPEED DATA
50th Percentile Speed 42 Post Speed Limit 45 mph
85th Percentile Speed 47 Recommended Speed Limit 45 mph 10 mph Pace Speed 38-47 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 84.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 1.58
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 1,155
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,643
Number of Lanes 2
Street Classification Major
Median/Type TWLT/ None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 147
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street West From/To: Ave H - North End
Survey date: Survey hours:

Location of survey:

SPEED DATA
50th Percentile Speed Post Speed Limit 30 mph
85th Percentile Speed Recommended Speed Limit 30 mph
10 mph Pace Speed Speed limit Justification
Percentage of Vehicles in Pace

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 525
Traffic Control Type

ROADWAY CHARACTERISTICS
Segment Length (feet) 380
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use Industrial/ Vacant
Comments
Keep the existing speed limit
A short street segment, function as a driveway to a warehouse Low volume road segment
ID: 148
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street West From/To: Lancaster - North End Survey date: 1/5/2022 Survey hours: 4:45p-5:50p
Location of survey: at Kildare

SPEED DATA
50th Percentile Speed 31 Post Speed Limit 35 mph
85th Percentile Speed 35 Recommended Speed Limit 35 mph 10 mph Pace Speed 26-35 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 93.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 315
Traffic Control Type

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,328
Number of Lanes 2
Street Classification Collector
Median/Type Painted
Bicycle lanes/Type E/S
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Low volume street, ends to the north and turns into a residential street 34/35 speed samples collected are 35 mph or lower
ID: 149
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street West From/To: Lancaster - Ave J
Survey date: 11/10/2021 Survey hours: 1:10p-2:00p
Location of survey: 1200' s/o Lancaster Blvd

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 44 Recommended Speed Limit 40 mph 10 mph Pace Speed 35-44 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 82.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 1.91
Expected Collision Rate (ACC/MVM) 1.32

TRAFFIC FACTORS
Average Daily Traffic 1,890
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,671
Number of Lanes 2
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use School/ Vacant
Comments
ID: 150
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street West From/To: Ave J - Ave J-12
Survey date: 11/10/2021 Survey hours: 1:10-2:00 pm
Location of survey: at Ave J-4

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 47 Recommended Speed Limit 40 mph 10 mph Pace Speed 35-44 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 69.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,153
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 3,796
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ School
Comments
Keep existing speed limit, Continuation of speed
ID: 151
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street West From/To: Ave K-8 - Ave L
Survey date: 10/28/2021 Survey hours: 3:15p-3:45p
Location of survey: at Ave K-10

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 50 Recommended Speed Limit 45 mph 10 mph Pace Speed 42-51 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 73.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.62
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 3,045
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,560
Number of Lanes 2
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit, Continuation of speed
ID: 153
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street West From/To: Ave L- Ave L-8
Survey date: 10/28/2021 Survey hours: 2:35p-3:10p
Location of survey: at Ave L-4

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 48 Recommended Speed Limit 45 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 68.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.9
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,100
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,560
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Increase speed limit, Continuation of speed
ID: 154
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street West From/To: Ave L-8- Ave M
Survey date: 10/28/2021 Survey hours: 1:50p-2:30p
Location of survey: at Ave L-12

SPEED DATA
50th Percentile Speed 44 Post Speed Limit 45 mph
85th Percentile Speed 51 Recommended Speed Limit 45 mph 10 mph Pace Speed 37-46 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 61.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.14
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 13,325
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,560
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use School/ Vacant
Comments
Keep existing speed limit, Continuation of speed
ID: 155
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 30th Street West From/To: Ave G- Ave G-8
Survey date: 11/2/2021 Survey hours: 10:05a-11:05a
Location of survey: at midpoint

SPEED DATA
50th Percentile Speed 54 Post Speed Limit 55 mph
85th Percentile Speed 59 Recommended Speed Limit 55 mph 10 mph Pace Speed 50-59 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 71.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 1.91
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 945
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,668
Number of Lanes 2
Street Classification Major
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Vacant
Comments
ID: 156
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 30th Street West From/To: Ave G-8 - Ave H
Survey date: 1/18/2022 Survey hours: 10:10a-10:40a / 1:10p-1:45p Location of survey: 1000' n/o Ave H

SPEED DATA
50th Percentile Speed 52 Post Speed Limit 55 mph
85th Percentile Speed 58 Recommended Speed Limit 55 mph 10 mph Pace Speed 51-60 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 65.9%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 945
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,612
Number of Lanes 4
Street Classification Major
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Industrial/ Vacant
Comments
ID: 157
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 27th Street West From/To: Ave I - Lancaster
Survey date: 11/10/2021 Survey hours: 3:20p-4:40p
Location of survey: at Double Play Way

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 51 Recommended Speed Limit 45 mph 10 mph Pace Speed 39-48 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 73.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 1.73
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 998
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,793
Number of Lanes 4
Street Classification Collector
Median/Type Raised
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves Horizontal
Adjacent Land use Commercial/ Vacant
Comments
Keep existing speed limit
ID: 166
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 23rd Street West From/To: Ave H-2 - Ave I
Survey date: 11/10/2021 Survey hours: 2:10p-3:15p
Location of survey: 1500' s/o Ave H-2

SPEED DATA
50th Percentile Speed 43 Post Speed Limit 45 mph
85th Percentile Speed 50 Recommended Speed Limit 45 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 59.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 2.65
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 945
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 3,850
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Vacant
Comments
Keep existing speed limit, high collision rate
ID: 174
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 20th Street West From/To: Ave L - Ave M
Survey date: 10/22/2021 Survey hours: 8:45a-9:15a
Location of survey: at Ave L-8

SPEED DATA
50th Percentile Speed 50 Post Speed Limit 50 mph
85th Percentile Speed 57 Recommended Speed Limit 50 mph 10 mph Pace Speed 45-54 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 66.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 6
Collision Rate (ACC/MVM) 0.65
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 8,400
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,327
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit
ID: 181
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 17th Street West From/To: Ave J-12 - Ave K
Survey date: 11/2/2021 Survey hours: 1:37p-2:10p
Location of survey: at Holiday Inn Express

SPEED DATA
50th Percentile Speed 36 Post Speed Limit 35 mph
85th Percentile Speed 39 Recommended Speed Limit 35 mph 10 mph Pace Speed 31-40 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 87.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 2.14
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 5,618
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,203
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves Horizontal
Adjacent Land use Commercial
Comments
ID: 182
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 17th Street West From/To: Ave K - Ave K-8
Survey date: 11/2/2021 Survey hours: 2:13p-3:05p
Location of survey: at Sunset Ridge

SPEED DATA
50th Percentile Speed 38 Post Speed Limit 40 mph
85th Percentile Speed 42 Recommended Speed Limit 40 mph 10 mph Pace Speed 32-41 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 80.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 5
Collision Rate (ACC/MVM) 5.63
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 1,601
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,674
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Commercial
Comments
ID: 183
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 13th Street West From/To: Ave K - 12th W
Survey date: 11/2/2021 Survey hours: 3:10p-3:45p
Location of survey: 300' s/o Ave K

SPEED DATA
50th Percentile Speed 30 Post Speed Limit 30 mph
85th Percentile Speed 35 Recommended Speed Limit 30 mph 10 mph Pace Speed 25-34 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 80.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 0.98
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 6,930
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,423
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves Horizontal
Adjacent Land use Commercial
Comments
Keep existing speed limit
ID: 192
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 12th Street West From/To: Ave K - Commerce Center Survey date: 11/10/2021 Survey hours: 10:48a-11:20a
Location of survey: 450' s/o Ave K

SPEED DATA
50th Percentile Speed 30 Post Speed Limit 30 mph
85th Percentile Speed 33 Recommended Speed Limit 30 mph 10 mph Pace Speed 26-35 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 91.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.39
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 12,424
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 993
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves Horizontal
Adjacent Land use Commercial
Comments
ID: 193
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Ave H - Ave H-8
Survey date: 10/21/2021 Survey hours: 10:08a-10:39a
Location of survey: at Ave H-4

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 54 Recommended Speed Limit 50 mph 10 mph Pace Speed 43-52 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 59.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 5
Collision Rate (ACC/MVM) 1.7
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 5,090
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,779
Number of Lanes 4
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
ID: 194
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Ave H-8 - Ave I
Survey date: 10/21/2021 Survey hours: 10:43a-11:09a
Location of survey: at Ave H-14

SPEED DATA
50th Percentile Speed 43 Post Speed Limit 45 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 37-46 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 65.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 35
Collision Rate (ACC/MVM) 4.99
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 13,545
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,499
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Commercial
Comments
ID: 195
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Ave I - Lancaster
Survey date: 10/21/2021 Survey hours: 11:30a-12:00p
Location of survey: at Jackman

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 45 Recommended Speed Limit 40 mph 10 mph Pace Speed 35-44 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 80.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 26
Collision Rate (ACC/MVM) 3.03
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 16,905
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,450
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
Keep existing speed limit, high collision rate
ID: 196
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Lancaster - Ave J
Survey date: 10/21/2021 Survey hours: 12:10p-12:40p
Location of survey: at Newgrove

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 46 Recommended Speed Limit 40 mph 10 mph Pace Speed 35-44 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 81.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 34
Collision Rate (ACC/MVM) 3.32
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 18,795
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,630
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Residential
Comments
Keep existing speed limit, high collision rate
ID: 197
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Ave J - Ave J-8
Survey date: 10/21/2021 Survey hours: 12:45p-1:10p
Location of survey: at Ave J-4

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 40 mph
85th Percentile Speed 47 Recommended Speed Limit 40 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 75.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 38
Collision Rate (ACC/MVM) 2.75
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 25,856
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,577
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Residential
Comments
Keep existing speed limit, high collision rate
ID: 198
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Ave J-8 - Ave K
Survey date: 10/21 & 11/17/2021 Survey hours: 1:12p-1:26p/ 3:40p-4:00p Location of survey: at Ave J-12

SPEED DATA
50th Percentile Speed 44 Post Speed Limit 45 mph
85th Percentile Speed 50 Recommended Speed Limit 45 mph 10 mph Pace Speed 39-48 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 67.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 28
Collision Rate (ACC/MVM) 1.85
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 26,985
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,698
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Residential
Comments
Keep existing speed limit, high collision rate
ID: 199
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Ave K - Ave K-8
Survey date: 10/21/2021 Survey hours: 1:30p-2:00p
Location of survey: at Ave K-4

SPEED DATA
50th Percentile Speed 40 Post Speed Limit 50 mph
85th Percentile Speed 46 Recommended Speed Limit 45 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 81.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 23
Collision Rate (ACC/MVM) 1.5
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 27,983
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,642
Number of Lanes 4
Street Classification Secondary
Median/Type Raised/ Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
Decrease speed limit
ID: 200
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Ave K-8 - Ave L
Survey date: 10/21/2021 Survey hours: 2:05p-2:30p
Location of survey: at YMCA

SPEED DATA
50th Percentile Speed 44 Post Speed Limit 50 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 39-48 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 62.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 18
Collision Rate (ACC/MVM) 1.55
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 21,053
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,668
Number of Lanes 4
Street Classification Secondary
Median/Type Painted/Raised
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial/ Vacant
Comments
Decrease speed limit
ID: 201
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 10th Street West From/To: Ave L - Ave M
Survey date: 10/21/2021 Survey hours: 2:35p-3:00p
Location of survey: at Ave L-8

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 55 Recommended Speed Limit 50 mph 10 mph Pace Speed 43-52 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 64.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 29
Collision Rate (ACC/MVM) 1.24
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 21,210
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,313
Number of Lanes 4-6
Street Classification Major
Median/Type Raised/Painted
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Commercial
Comments
Keep existing speed limit
ID: 202
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 7th Street West From/To: Ave G-12 - Ave H
Survey date: 10/26 & 11/17/2021 Survey hours: 9:00a-10:00a /2:35p-2:50p Location of survey: 400' n/o Ave G-12

SPEED DATA
50th Percentile Speed 32 Post Speed Limit 40 mph
85th Percentile Speed 39 Recommended Speed Limit 40 mph 10 mph Pace Speed 29-38 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 57.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 899
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,311
Number of Lanes 4
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
ID: 203
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 6th Street West From/To: Ave L-8 - Ave M
Survey date: 10/26/2021 Survey hours: 12:05p-12:45p
Location of survey: n/o Ave L-14

SPEED DATA
50th Percentile Speed 33 Post Speed Limit 40 mph
85th Percentile Speed 41 Recommended Speed Limit 40 mph 10 mph Pace Speed 26-35 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 62.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.78
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 2,369
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,600
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
ID: 204
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Gadsden Avenue From/To: Ave K - Ave K-8
Survey date: 10/26/2021 Survey hours: 11:15a-11:58a
Location of survey: at Ave K-4

SPEED DATA
50th Percentile Speed 34 Post Speed Limit 35 mph
85th Percentile Speed 38 Recommended Speed Limit 35 mph 10 mph Pace Speed 29-38 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 68.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 6
Collision Rate (ACC/MVM) 8.69
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 1,250
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,665
Number of Lanes 2
Street Classification Collector
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Commercial
Comments
ID: 205
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Yucca Avenue From/To: Ave I - Lancaster
Survey date: 10/26/2021 Survey hours: 2:05p-3:00p
Location of survey: s/o Jackman St

SPEED DATA
50th Percentile Speed 36 Post Speed Limit 40 mph
85th Percentile Speed 45 Recommended Speed Limit 40 mph 10 mph Pace Speed 33-42 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 50.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 6.27
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 1,575
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,953
Number of Lanes 4
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
Keep existing speed limit, high collision rate
ID: 214
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Yucca Avenue From/To: Lancaster - Milling
Survey date: 10/26/2021 Survey hours: 1:30p-2:00p
Location of survey: s/o Lumber St

SPEED DATA
50th Percentile Speed 29 Post Speed Limit 40 mph
85th Percentile Speed 33 Recommended Speed Limit 35 mph 10 mph Pace Speed 25-34 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 77.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 2.73
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 5,460
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 648
Number of Lanes 4
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
Decrease speed limit
ID: 215
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Trevor Avenue From/To: Ave H - Ave I
Survey date: 10/26/2021 Survey hours: 10:05a-11:00a
Location of survey: at Ave H-6

SPEED DATA
50th Percentile Speed 38 Post Speed Limit 40 mph
85th Percentile Speed 48 Recommended Speed Limit 40 mph 10 mph Pace Speed 34-43 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 54.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 0.99
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 3,833
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,085
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
Keep existing speed limit
ID: 216
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: Business Center Parkway From/To: Ave K-8 - Ave L Survey date: 10/26/2021 Survey hours: 12:55p-1:20p
Location of survey: s/o Ave K-10

SPEED DATA
50th Percentile Speed 44 Post Speed Limit 50 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 39-48 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 68.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 14
Collision Rate (ACC/MVM) 1.45
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 13,493
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 3,441
Number of Lanes 4
Street Classification Major
Median/Type Raised
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves Horizontal
Adjacent Land use Commercial
Comments
Decrease speed limit, High collision rate
ID: 225
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 3rd Street East From/To: Ave I - Lancaster
Survey date: 10/27/2021 Survey hours: 9:00a-9:30a
Location of survey: at Kettering St

SPEED DATA
50th Percentile Speed 35 Post Speed Limit 35 mph
85th Percentile Speed 40 Recommended Speed Limit 35 mph 10 mph Pace Speed 29-38 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 63.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 7
Collision Rate (ACC/MVM) 1.44
Expected Collision Rate (ACC/MVM) 1.96

TRAFFIC FACTORS
Average Daily Traffic 9,135
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,560
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use School/ Residential
Comments
Keep existing speed limit
ID: 226
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 4th Street East From/To: Ave L - Ave M
Survey date: 10/27/2021 Survey hours: 9:45a-10:15a
Location of survey: at Ave L-4

SPEED DATA
50th Percentile Speed 44 Post Speed Limit 45 mph
85th Percentile Speed 51 Recommended Speed Limit 45 mph 10 mph Pace Speed 38-47 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 60.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 8
Collision Rate (ACC/MVM) 1.13
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 6,615
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,152
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks No
Vertical/Horizontal Curves None
Adjacent Land use Industrial
Comments
Keep existing speed limit
ID: 227
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 5th Street East From/To: Ave K - Ave K-8
Survey date: 10/27/2021 Survey hours: 10:25a-11:00a
Location of survey: at Ave K-4

SPEED DATA
50th Percentile Speed 36 Post Speed Limit 40 mph
85th Percentile Speed 42 Recommended Speed Limit 40 mph 10 mph Pace Speed 30-39 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 67.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.58
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 3,150
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,635
Number of Lanes 2
Street Classification Collector
Median/Type None
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Vacant/ Residential
Comments
ID: 232
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 15th Street East From/To: Ave H-12 - Ave I
Survey date: 10/27/2021 Survey hours: 2:35p-3:15p
Location of survey: 300' n/o Ave I

SPEED DATA
50th Percentile Speed 35 Post Speed Limit 35 mph
85th Percentile Speed 41 Recommended Speed Limit 35 mph 10 mph Pace Speed 29-38 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 71.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 4.25
Expected Collision Rate (ACC/MVM) 1.32

TRAFFIC FACTORS
Average Daily Traffic 872
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,303
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit, high collision rate
ID: 240
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 15th Street East From/To: Ave I - Lancaster
Survey date: 10/27/2021 Survey hours: 2:00p-2:30p
Location of survey: at Kettering St

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 50 Recommended Speed Limit 45 mph 10 mph Pace Speed 41-50 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 61.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 1.37
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 3,938
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,685
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Keep existing speed limit, high collision rate
ID: 241
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 15th Street East From/To: Lancaster - Ave J
Survey date: 10/27/2021 Survey hours: 1:25p-1:55p
Location of survey: at Willow Creek Condo

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 51 Recommended Speed Limit 45 mph 10 mph Pace Speed 42-51 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 65.9%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 1.05
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 5,145
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,667
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit, high collision rate
ID: 242
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 15th Street East From/To: Ave J - Ave J-8
Survey date: 10/27/2021 Survey hours: 12:45p-1:15p
Location of survey: at Ave J-4

SPEED DATA
50th Percentile Speed 44 Post Speed Limit 45 mph
85th Percentile Speed 52 Recommended Speed Limit 45 mph 10 mph Pace Speed 39-48 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 59.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 6
Collision Rate (ACC/MVM) 1.85
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 6,221
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,513
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit, high collision rate
ID: 243
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 15th Street East From/To: Ave J-8 - Ave K
Survey date: 10/27/2021 Survey hours: 12:05p-12:35p
Location of survey: at Ave J-12

SPEED DATA
50th Percentile Speed 45 Post Speed Limit 45 mph
85th Percentile Speed 51 Recommended Speed Limit 45 mph 10 mph Pace Speed 39-48 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 68.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 1.11
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 4,962
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,630
Number of Lanes 4
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit, high collision rate
ID: 244
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 15th Street East From/To: Ave K - Ave K-8
Survey date: 10/27/2021 Survey hours: 11:10a-11:45a
Location of survey: at Marion Ave

SPEED DATA
50th Percentile Speed 41 Post Speed Limit 50 mph
85th Percentile Speed 46 Recommended Speed Limit 45 mph 10 mph Pace Speed 38-47 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 76.9%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 2.57
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,100
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,679
Number of Lanes 3
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type Class II N/B
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Decrease speed limit
ID: 245
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 20th Street East From/To: Ave H - Ave I
Survey date: 11/1/2021 Survey hours: 10:00a-10:30a
Location of survey: at Ave H-4

SPEED DATA
50th Percentile Speed 52 Post Speed Limit 55 mph
85th Percentile Speed 57 Recommended Speed Limit 55 mph 10 mph Pace Speed 48-57 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 60.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 7
Collision Rate (ACC/MVM) 6.03
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 2,149
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,605
Number of Lanes 2-3
Street Classification Major
Median/Type Raised/ Painted
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Vacant/ Residential
Comments
ID: 246
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 20th Street East From/To: Ave I - Lancaster
Survey date: 11/1/2021 Survey hours: 10:35a-11:05a
Location of survey: at Kettering St

SPEED DATA
50th Percentile Speed 47 Post Speed Limit 50 mph
85th Percentile Speed 53 Recommended Speed Limit 50 mph 10 mph Pace Speed 42-51 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 66.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 5
Collision Rate (ACC/MVM) 1.17
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 7,718
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,669
Number of Lanes 2-4
Street Classification Major
Median/Type Raised/ Painted/ None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 247
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 20th Street East From/To: Lancaster - Ave J
Survey date: 11/1/2021 Survey hours: 11:10a-11:45a
Location of survey: at Nugent St

SPEED DATA
50th Percentile Speed 46 Post Speed Limit 50 mph
85th Percentile Speed 55 Recommended Speed Limit 50 mph 10 mph Pace Speed 39-48 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 56.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 12
Collision Rate (ACC/MVM) 1.6
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 14,149
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,560
Number of Lanes 3
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant/ Commercial
Comments
Keep existing speed limit, high collision rate, continuation of speed ID: 248
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 20th Street East From/To: Ave J - Ave J-8
Survey date: 11/1/2021 Survey hours: 12:10p-12:40p
Location of survey: at Ave J-4

SPEED DATA
50th Percentile Speed 46 Post Speed Limit 50 mph
85th Percentile Speed 52 Recommended Speed Limit 50 mph 10 mph Pace Speed 41-50 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 64.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 10
Collision Rate (ACC/MVM) 1.37
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 13,751
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,560
Number of Lanes 3
Street Classification Major
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Commercial
Comments
ID: 249
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 20th Street East From/To: Ave J-8 - Ave K
Survey date: 11/1/2021 Survey hours: 12:45a-1:15p
Location of survey: n/o Acosta Ave

SPEED DATA
50th Percentile Speed 50 Post Speed Limit 50 mph
85th Percentile Speed 55 Recommended Speed Limit 50 mph 10 mph Pace Speed 46-55 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 60.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 10
Collision Rate (ACC/MVM) 2.8
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 6,720
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,560
Number of Lanes 4
Street Classification Major
Median/Type Painted
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit, high collision rate
ID: 250
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 20th Street East From/To: Ave K - Ave L
Survey date: 11/1/2021 Survey hours: 1:20p-1:50p
Location of survey: at Ave K-8

SPEED DATA
50th Percentile Speed 53 Post Speed Limit 55 mph
85th Percentile Speed 60 Recommended Speed Limit 55 mph 10 mph Pace Speed 50-59 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 58.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 11
Collision Rate (ACC/MVM) 1.34
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 7,508
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 5,285
Number of Lanes 2-3
Street Classification Major
Median/Type Raised/ None
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Keep existing speed limit, high collision rate, continuation of speed ID: 251
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 25th Street East From/To: Ave H-8 - Ave I
Survey date: 11/2/2021 Survey hours: 12:45p-1:30p
Location of survey: 400' n/o Ave I

SPEED DATA
50th Percentile Speed 39 Post Speed Limit 40 mph
85th Percentile Speed 46 Recommended Speed Limit 40 mph 10 mph Pace Speed 35-44 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 67.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 17.41
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 315
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,637
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Keep existing speed limit
ID: 252
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 25th Street East From/To: Ave I - Lancaster
Survey date: 11/2/2021 Survey hours: 11:50a-12:20p
Location of survey: at Kettering St

SPEED DATA
50th Percentile Speed 41 Post Speed Limit 45 mph
85th Percentile Speed 46 Recommended Speed Limit 45 mph 10 mph Pace Speed 37-46 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 81.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 2,520
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,656
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 253
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 25th Street East From/To: Lancaster - Ave J
Survey date: 11/2/2021 Survey hours: 11:15a-11:45a
Location of survey: at Nugent St

SPEED DATA
50th Percentile Speed 42 Post Speed Limit 45 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 65.8%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 3.29
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 1,680
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,618
Number of Lanes 2
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 254
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 25th Street East From/To: Ave J - Ave J-4
Survey date: 11/2 & 11/9/2021 Survey hours: 10:10a-11:10a/ 3:40p-4:40p Location of survey: 300' s/o Ave J

SPEED DATA
50th Percentile Speed 38 Post Speed Limit 40 mph
85th Percentile Speed 43 Recommended Speed Limit 40 mph 10 mph Pace Speed 33-42 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 77.5%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.32

TRAFFIC FACTORS
Average Daily Traffic 635
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,240
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 255
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 25th Street East From/To: Ave J-8 - Ave K
Survey date: 11/2/2021 Survey hours: 9:30a-10:00
Location of survey: at Morningside Ave

SPEED DATA
50th Percentile Speed 39 Post Speed Limit 40 mph
85th Percentile Speed 50 Recommended Speed Limit 40 mph 10 mph Pace Speed 30-39 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 44.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 2.59
Expected Collision Rate (ACC/MVM) 1.32

TRAFFIC FACTORS
Average Daily Traffic 1,418
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,630
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Keep existing speed limit, high collision rate
ID: 256
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 25th Street East From/To: Ave K - Ave K-4
Survey date: 11/1 & 12/15/21 Survey hours: 2:00p-3:00p /11:00a-12:00p Location of survey: 350' s/o Ave K

SPEED DATA
50th Percentile Speed 30 Post Speed Limit 35 mph
85th Percentile Speed 36 Recommended Speed Limit 35 mph 10 mph Pace Speed 27-36 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 86.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 1.32

TRAFFIC FACTORS
Average Daily Traffic 347
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 1,305
Number of Lanes 3
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Low volume road, a short segment and an entrance to a residential neighborhood ID: 257
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 26th Street East From/To: Ave H-8 - Ave I
Survey date: 11/1 & 12/2/21 Survey hours: 1:35p-2:30p /7:45a-9:00a Location of survey: 700' w/o Ave I

SPEED DATA
50th Percentile Speed 33 Post Speed Limit 35 mph
85th Percentile Speed 37 Recommended Speed Limit 35 mph 10 mph Pace Speed 28-37 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 81.3%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 2.61

TRAFFIC FACTORS
Average Daily Traffic 945
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,630
Number of Lanes 2
Street Classification Local
Median/Type None
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 258
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 30th Street East From/To: Ave I - Lancaster
Survey date: 11/2/2021 Survey hours: 2:35p-3:00p
Location of survey: at Kettering St

SPEED DATA
50th Percentile Speed 42 Post Speed Limit 50 mph
85th Percentile Speed 46 Recommended Speed Limit 45 mph 10 mph Pace Speed 37-46 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 74.4%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 1.93
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 2,835
Traffic Control Type Traffic signal/stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,646
Number of Lanes 3
Street Classification Major
Median/Type None
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use School/ City Park/ Vacant
Comments
Decrease speed limit
ID: 259
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 30th Street East From/To: Lancaster - Ave J
Survey date: 11/2/2021 Survey hours: 3:05p-3:35 pm
Location of survey: at Nugent St

SPEED DATA
50th Percentile Speed 46 Post Speed Limit 50 mph
85th Percentile Speed 49 Recommended Speed Limit 45 mph 10 mph Pace Speed 40-49 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 78.0%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 1.02
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 5,565
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,550
Number of Lanes 2-4
Street Classification Major
Median/Type Raised/ None
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Decrease speed limit
ID: 260
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 30th Street East From/To: Ave J - Ave J-8
Survey date: 11/3/2021 Survey hours: 9:00a-9:30a
Location of survey: at Ave J-4

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 54 Recommended Speed Limit 50 mph 10 mph Pace Speed 45-54 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 66.1%

COLLISION HISTORY
Number of Years 3
Total Collisions 11
Collision Rate (ACC/MVM) 3.27
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 6,248
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,600
Number of Lanes 2
Street Classification Major
Median/Type Painted
Bicycle lanes/Type No
Sidewalks Partial
Vertical/Horizontal Curves None
Adjacent Land use Vacant/ Residential
Comments
ID: 261
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 30th Street East From/To: Ave J-8 - Ave K
Survey date: 11/3/2021 Survey hours: 9:35a-10:05a
Location of survey: at San Miguel Dr

SPEED DATA
50th Percentile Speed 46 Post Speed Limit 50 mph
85th Percentile Speed 53 Recommended Speed Limit 50 mph 10 mph Pace Speed 41-50 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 65.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 3
Collision Rate (ACC/MVM) 0.79
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 7,140
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,550
Number of Lanes 4
Street Classification Major
Median/Type Raised
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
ID: 262
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 30th Street East From/To: Ave K - Ave K-8
Survey date: 11/3/2021 Survey hours: 10:15a-10:45a
Location of survey: at Ave K-4

SPEED DATA
50th Percentile Speed 52 Post Speed Limit 55 mph
85th Percentile Speed 58 Recommended Speed Limit 55 mph 10 mph Pace Speed 43-52 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 55.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.29
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 6,631
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,550
Number of Lanes 3
Street Classification Major
Median/Type TWLT
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
ID: 263
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 30th Street East From/To: Ave K-8 - Ave L
Survey date: 11/3/2021 Survey hours: 10:55a-11:30a
Location of survey: 1000' n/o Ave L

SPEED DATA
50th Percentile Speed 54 Post Speed Limit 55 mph
85th Percentile Speed 59 Recommended Speed Limit 55 mph 10 mph Pace Speed 50-59 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 70.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 7
Collision Rate (ACC/MVM) 1.92
Expected Collision Rate (ACC/MVM) 1.15

TRAFFIC FACTORS
Average Daily Traffic 6,631
Traffic Control Type Traffic signal

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,657
Number of Lanes 3-4
Street Classification Major
Median/Type Raised/ Painted
Bicycle lanes/Type No
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant/ Lancaster Soccer Ctr Comments
ID: 264
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street East From/To: Ave H-8 - Ave I
Survey date: 11/3/2021 Survey hours: 1:50p-2:30p
Location of survey: 300' n/o Ave I

SPEED DATA
50th Percentile Speed 30 Post Speed Limit 40 mph
85th Percentile Speed 34 Recommended Speed Limit 35 mph 10 mph Pace Speed 25-34 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 86.2%

COLLISION HISTORY
Number of Years 3
Total Collisions 2
Collision Rate (ACC/MVM) 5.28
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 683
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,677
Number of Lanes 3
Street Classification Secondary
Median/Type Raised
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use Residential
Comments
Decrease speed limit
ID: 265
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street East From/To: Ave J-8 - Ave K
Survey date: 11/3 & 12/1/21 Survey hours: 2:40p-3:10p /2:00p-2:30p Location of survey: 1000' s/o Ave J-8

SPEED DATA
50th Percentile Speed 39 Post Speed Limit 40 mph
85th Percentile Speed 45 Recommended Speed Limit 40 mph 10 mph Pace Speed 36-45 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 78.9%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 1.22
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 1,524
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,590
Number of Lanes 2
Street Classification Secondary
Median/Type TWLT
Bicycle lanes/Type Class II
Sidewalks Yes
Vertical/Horizontal Curves None
Adjacent Land use School/ Residential/ Vacant
Comments
Keep existing speed limit, High collision rate
ID: 266
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street East From/To: Ave K - Ave K-8
Survey date: 11/3/2021 Survey hours: 3:15p-3:45p
Location of survey: at Ave K-4

SPEED DATA
50th Percentile Speed 48 Post Speed Limit 50 mph
85th Percentile Speed 55 Recommended Speed Limit 50 mph 10 mph Pace Speed 46-55 Speed limit Justification CVC 22358.8(a) Percentage of Vehicles in Pace 56.6%

COLLISION HISTORY
Number of Years 3
Total Collisions 4
Collision Rate (ACC/MVM) 9.93
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 735
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,642
Number of Lanes 2
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Vacant
Comments
Keep existing speed limit, High collision rate
ID: 267
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 35th Street East From/To: Ave K-8 - Ave L
Survey date: 11/3/2021 Survey hours: 11:40a-12:40p
Location of survey: at James Ct

SPEED DATA
50th Percentile Speed 49 Post Speed Limit 50 mph
85th Percentile Speed 53 Recommended Speed Limit 50 mph 10 mph Pace Speed 45-54 Speed limit Justification CVC 22358.6 Percentage of Vehicles in Pace 65.7%

COLLISION HISTORY
Number of Years 3
Total Collisions 0
Collision Rate (ACC/MVM) 0
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 630
Traffic Control Type

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,613
Number of Lanes 2
Street Classification Secondary
Median/Type None
Bicycle lanes/Type No
Sidewalks W/S
Vertical/Horizontal Curves None
Adjacent Land use Residential/ Soccer Ctr/ Vacant
Comments
ID: 268
Lancaster/Speed survey data summary

CITY OF LANCASTER

ENGINEERING AND TRAFFIC SURVEY
Street: 40th Street East From/To: Lancaster - Ave J
Survey date: 11/3/2021 Survey hours: 12:50p-1:20p
Location of survey: 1000' s/o Lancaster Blvd

SPEED DATA
50th Percentile Speed 47 Post Speed Limit 50 mph
85th Percentile Speed 52 Recommended Speed Limit 50 mph 10 mph Pace Speed 41-50 Speed limit Justification 85th percentile speed Percentage of Vehicles in Pace 67.9%

COLLISION HISTORY
Number of Years 3
Total Collisions 1
Collision Rate (ACC/MVM) 0.45
Expected Collision Rate (ACC/MVM) 0.84

TRAFFIC FACTORS
Average Daily Traffic 4,095
Traffic Control Type Stop sign

ROADWAY CHARACTERISTICS
Segment Length (feet) 2,590
Number of Lanes 3
Street Classification Secondary
Median/Type Painted
Bicycle lanes/Type No
Sidewalks E/S
Vertical/Horizontal Curves None
Adjacent Land use College/ Vacant
Comments
ID: 269
Lancaster/Speed survey data summary

3. Spot Speed Survey Data Calculation Sheet
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue G
Location: at Great Western Drive
Between: 50th Street West to 25th Street West Ref. # 1
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
25 0 0.00% 0.00% Hours: 9:15A To 10:00
26 0 0.00% 0.00% Recorder: EY
27 0 0.00% 0.00% Posted Speed: 55
28 0 0.00% 0.00% Remarks:
29 0 0.00% 0.00%
30 0 0.00% 0.00%
31 0 0.00% 0.00%
32 0 0.00% 0.00% DATA ANALYSIS:
33 0 0.00% 0.00% Mean Speed: 55
34 0 0.00% 0.00% Standard Deviation: 5
35 0 0.00% 0.00% Standard error of the mean: 0.45
36 0 0.00% 0.00% 50th Percentile: 55
37 0 0.00% 0.00% 85th Percentile: 61
38 0 0.00% 0.00% 97th Percentile: 64
39 0 0.00% 0.00% 10 Mile Pace: 49 to 58
40 0 0.00% 0.00% % of Samples in 10-Mile Pace: 64.75%
41 0 0.00% 0.00% Comments:
42 0 0.00% 0.00%
43 0 0.00% 0.00%
44 0 0.00% 0.00%
45 3 2.46% 2.46%
46 3 2.46% 4.92%
47 5 4.10% 9.02%
48 3 2.46% 11.48%
49 7 5.74% 17.21%
50 4 3.28% 20.49%
51 7 5.74% 26.23%
52 5 4.10% 30.33%
53 9 7.38% 37.70%
54 8 6.56% 44.26%
55 9 7.38% 51.64%
56 11 9.02% 60.66%
57 13 10.66% 71.31%
58 6 4.92% 76.23%
59 4 3.28% 79.51%
60 4 3.28% 82.79%
61 6 4.92% 87.70%
62 5 4.10% 91.80%
63 5 4.10% 95.90%
64 2 1.64% 97.54%
65 2 1.64% 99.18%
66 0 0.00% 99.18%
67 1 0.82% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
71 0 0.00% 100.00%
Total: 122 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue G-12
Location: 400' e/o 7th St W
Between: 7th Street West to Sierra Highway Ref. # 3
Cumulative Date: 11/17/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
25 0 0.00% 0.00% Hours: 7:50 /2:05 To 8:50 /2:35
26 0 0.00% 0.00% Recorder: AY
27 2 2.63% 2.63% Posted Speed: 40
28 2 2.63% 5.26% Remarks:
29 2 2.63% 7.89%
30 5 6.58% 14.47%
31 9 11.84% 26.32%
32 4 5.26% 31.58% DATA ANALYSIS:
33 2 2.63% 34.21% Mean Speed: 36
34 2 2.63% 36.84% Standard Deviation: 4
35 5 6.58% 43.42% Standard error of the mean: 0.46
36 9 11.84% 55.26% 50th Percentile: 36
37 8 10.53% 65.79% 85th Percentile: 41
38 7 9.21% 75.00% 97th Percentile: 43
39 3 3.95% 78.95% 10 Mile Pace: 30 to 39
40 4 5.26% 84.21% % of Samples in 10-Mile Pace: 71.05%
41 1 1.32% 85.53% Comments:
42 6 7.89% 93.42%
43 4 5.26% 98.68%
44 1 1.32% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
71 0 0.00% 100.00%
Total: 76 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8 9
10Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue H
Location: at 32nd Street West
Between: 35th Street West to 30th Street West Ref. # 4
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:10A To 12:00P
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 54
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.38
31 0 0.00% 0.00% 50th Percentile: 54
32 0 0.00% 0.00% 85th Percentile: 59
33 0 0.00% 0.00% 97th Percentile: 62
34 0 0.00% 0.00% 10 Mile Pace: 50 to 59
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 74.34%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 0 0.00% 0.00%
43 0 0.00% 0.00%
44 0 0.00% 0.00%
45 0 0.00% 0.00%
46 2 1.77% 1.77%
47 4 3.54% 5.31%
48 6 5.31% 10.62%
49 5 4.42% 15.04%
50 7 6.19% 21.24%
51 9 7.96% 29.20%
52 8 7.08% 36.28%
53 7 6.19% 42.48%
54 9 7.96% 50.44%
55 7 6.19% 56.64%
56 14 12.39% 69.03%
57 3 2.65% 71.68%
58 11 9.73% 81.42%
59 9 7.96% 89.38%
60 2 1.77% 91.15%
61 2 1.77% 92.92%
62 5 4.42% 97.35%
63 1 0.88% 98.23%
64 1 0.88% 99.12%
65 1 0.88% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 113 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue H-2-25th St West
Location: 400 feet east of 25th Street West
Between: Ave H to 23rd Street West Ref. # 8
Cumulative Date: 12/1/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:45p To 3:45p
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 1 1.32% 1.32%
27 1 1.32% 2.63% DATA ANALYSIS:
28 0 0.00% 2.63% Mean Speed: 34
29 0 0.00% 2.63% Standard Deviation: 3
30 3 3.95% 6.58% Standard error of the mean: 0.34
31 4 5.26% 11.84% 50th Percentile: 34
32 7 9.21% 21.05% 85th Percentile: 38
33 14 18.42% 39.47% 97th Percentile: 40
34 14 18.42% 57.89% 10 Mile Pace: 30 to 39
35 8 10.53% 68.42% % of Samples in 10-Mile Pace: 92.11% 36 6 7.89% 76.32% Comments:
37 4 5.26% 81.58%
38 7 9.21% 90.79%
39 3 3.95% 94.74%
40 3 3.95% 98.68%
41 0 0.00% 98.68%
42 0 0.00% 98.68%
43 0 0.00% 98.68%
44 0 0.00% 98.68%
45 1 1.32% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 76 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue H-8
Location: at 3rd Street East
Between: Division Street to 5th Street East Ref. # 9
Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:30 To 12:35
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 38
29 0 0.00% 0.00% Standard Deviation: 4
30 1 1.02% 1.02% Standard error of the mean: 0.4
31 3 3.06% 4.08% 50th Percentile: 38
32 5 5.10% 9.18% 85th Percentile: 42
33 4 4.08% 13.27% 97th Percentile: 46
34 5 5.10% 18.37% 10 Mile Pace: 33 to 42
35 5 5.10% 23.47% % of Samples in 10-Mile Pace: 76.53%
36 8 8.16% 31.63% Comments:
37 13 13.27% 44.90%
38 6 6.12% 51.02%
39 11 11.22% 62.24%
40 10 10.20% 72.45%
41 7 7.14% 79.59%
42 6 6.12% 85.71%
43 3 3.06% 88.78%
44 3 3.06% 91.84%
45 3 3.06% 94.90%
46 3 3.06% 97.96%
47 2 2.04% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 98 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue H-8
Location: at Fairbanks Ave
Between: 15th Street East to 20th Street East Ref. # 10 Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 5 4.50% 4.50% Hours: 12:45 To 1:30
21 5 4.50% 9.01% Recorder: EY
22 4 3.60% 12.61% Posted Speed: 35
23 18 16.22% 28.83% Remarks:
24 8 7.21% 36.04%
25 10 9.01% 45.05%
26 17 15.32% 60.36%
27 13 11.71% 72.07% DATA ANALYSIS:
28 12 10.81% 82.88% Mean Speed: 26
29 7 6.31% 89.19% Standard Deviation: 3
30 3 2.70% 91.89% Standard error of the mean: 0.28
31 4 3.60% 95.50% 50th Percentile: 26
32 1 0.90% 96.40% 85th Percentile: 29
33 2 1.80% 98.20% 97th Percentile: 33
34 2 1.80% 100.00% 10 Mile Pace: 20 to 29
35 0 0.00% 100.00% % of Samples in 10-Mile Pace: 89.19% 36 0 0.00% 100.00% Comments:
37 0 0.00% 100.00%
38 0 0.00% 100.00%
39 0 0.00% 100.00%
40 0 0.00% 100.00%
41 0 0.00% 100.00%
42 0 0.00% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 111 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue I
Location: 500 feet W of 27th Street West
Between: 30th Street West to 27th Street West Ref. # 12 Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:05 To 12:40
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 52
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.61
31 0 0.00% 0.00% 50th Percentile: 52
32 0 0.00% 0.00% 85th Percentile: 59
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 45 to 54
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 64.95%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 3 3.09% 3.09%
43 2 2.06% 5.15%
44 0 0.00% 5.15%
45 2 2.06% 7.22%
46 6 6.19% 13.40%
47 7 7.22% 20.62%
48 8 8.25% 28.87%
49 11 11.34% 40.21%
50 1 1.03% 41.24%
51 6 6.19% 47.42%
52 12 12.37% 59.79%
53 3 3.09% 62.89%
54 7 7.22% 70.10%
55 2 2.06% 72.16%
56 5 5.15% 77.32%
57 3 3.09% 80.41%
58 2 2.06% 82.47%
59 4 4.12% 86.60%
60 1 1.03% 87.63%
61 2 2.06% 89.69%
62 4 4.12% 93.81%
63 0 0.00% 93.81%
64 3 3.09% 96.91%
65 1 1.03% 97.94%
66 0 0.00% 97.94%
67 0 0.00% 97.94%
68 1 1.03% 98.97%
69 0 0.00% 98.97%
73 1 1.03% 100.00%
Total: 97 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue I
Location: E of Fern
Between: 10th Street West to Sierra Highway Ref. # 17
Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:00 To 9:30
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 3
30 0 0.00% 0.00% Standard error of the mean: 0.28
31 0 0.00% 0.00% 50th Percentile: 40
32 0 0.00% 0.00% 85th Percentile: 44
33 1 0.88% 0.88% 97th Percentile: 47
34 1 0.88% 1.75% 10 Mile Pace: 36 to 45
35 3 2.63% 4.39% % of Samples in 10-Mile Pace: 88.60%
36 3 2.63% 7.02% Comments:
37 8 7.02% 14.04%
38 9 7.89% 21.93%
39 17 14.91% 36.84%
40 15 13.16% 50.00%
41 12 10.53% 60.53%
42 10 8.77% 69.30%
43 11 9.65% 78.95%
44 9 7.89% 86.84%
45 7 6.14% 92.98%
46 3 2.63% 95.61%
47 2 1.75% 97.37%
48 2 1.75% 99.12%
49 1 0.88% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 114 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue I
Location: w/o 25th Street East
Between: 20th Street East to 30th Street East Ref. # 23 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:40 To 10:40
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 47
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.35
31 0 0.00% 0.00% 50th Percentile: 47
32 0 0.00% 0.00% 85th Percentile: 52
33 0 0.00% 0.00% 97th Percentile: 54
34 0 0.00% 0.00% 10 Mile Pace: 44 to 53
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 76.38%
36 0 0.00% 0.00% Comments:
37 1 0.79% 0.79%
38 1 0.79% 1.57%
39 4 3.15% 4.72%
40 0 0.00% 4.72%
41 5 3.94% 8.66%
42 9 7.09% 15.75%
43 4 3.15% 18.90%
44 9 7.09% 25.98%
45 10 7.87% 33.86%
46 13 10.24% 44.09%
47 8 6.30% 50.39%
48 13 10.24% 60.63%
49 14 11.02% 71.65%
50 6 4.72% 76.38%
51 7 5.51% 81.89%
52 9 7.09% 88.98%
53 8 6.30% 95.28%
54 4 3.15% 98.43%
55 0 0.00% 98.43%
56 1 0.79% 99.21%
57 1 0.79% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 127 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue I
Location: at 3233 Ave I
Between: 30th Street East to 40th Street East Ref. # 24 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:45 To 11:15
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 49
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.46
31 0 0.00% 0.00% 50th Percentile: 50
32 0 0.00% 0.00% 85th Percentile: 55
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 45 to 54
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 64.66%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 1 0.86% 0.86%
40 2 1.72% 2.59%
41 3 2.59% 5.17%
42 11 9.48% 14.66%
43 4 3.45% 18.10%
44 2 1.72% 19.83%
45 6 5.17% 25.00%
46 6 5.17% 30.17%
47 7 6.03% 36.21%
48 8 6.90% 43.10%
49 5 4.31% 47.41%
50 11 9.48% 56.90%
51 7 6.03% 62.93%
52 12 10.34% 73.28%
53 5 4.31% 77.59%
54 8 6.90% 84.48%
55 2 1.72% 86.21%
56 5 4.31% 90.52%
57 4 3.45% 93.97%
58 3 2.59% 96.55%
59 4 3.45% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 116 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Lancaster Blvd
Location: East of 32nd Street west
Between: 30th Street West to 35th Street West Ref. # 25 Cumulative Date: 12/1/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 4:00 To 4:30
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 39
29 0 0.00% 0.00% Standard Deviation: 3
30 0 0.00% 0.00% Standard error of the mean: 0.29
31 0 0.00% 0.00% 50th Percentile: 39
32 1 0.95% 0.95% 85th Percentile: 42
33 3 2.86% 3.81% 97th Percentile: 45
34 8 7.62% 11.43% 10 Mile Pace: 34 to 43
35 4 3.81% 15.24% % of Samples in 10-Mile Pace: 89.52%
36 11 10.48% 25.71% Comments:
37 11 10.48% 36.19%
38 10 9.52% 45.71%
39 18 17.14% 62.86%
40 9 8.57% 71.43%
41 8 7.62% 79.05%
42 7 6.67% 85.71%
43 8 7.62% 93.33%
44 1 0.95% 94.29%
45 4 3.81% 98.10%
46 1 0.95% 99.05%
47 1 0.95% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 105 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Lancaster Boulevard
Location: at Shadowcrest Drive
Between: 30th Street West to 25th Street West Ref. # 26 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:30 To 10:10
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 49
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.4
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 54
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 45 to 54
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 80.00%
36 0 0.00% 0.00% Comments:
37 1 1.00% 1.00%
38 0 0.00% 1.00%
39 1 1.00% 2.00%
40 0 0.00% 2.00%
41 0 0.00% 2.00%
42 3 3.00% 5.00%
43 3 3.00% 8.00%
44 1 1.00% 9.00%
45 7 7.00% 16.00%
46 7 7.00% 23.00%
47 10 10.00% 33.00%
48 9 9.00% 42.00%
49 17 17.00% 59.00%
50 7 7.00% 66.00%
51 6 6.00% 72.00%
52 8 8.00% 80.00%
53 2 2.00% 82.00%
54 7 7.00% 89.00%
55 1 1.00% 90.00%
56 4 4.00% 94.00%
57 1 1.00% 95.00%
58 0 0.00% 95.00%
59 3 3.00% 98.00%
60 0 0.00% 98.00%
61 1 1.00% 99.00%
62 0 0.00% 99.00%
63 1 1.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 100 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Lancaster Boulevard
Location: e/o Trevor
Between: Yucca Ave to Division St Ref. # 31
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:20 To 2:20
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 30
23 1 1.47% 1.47% Remarks:
24 1 1.47% 2.94%
25 2 2.94% 5.88%
26 2 2.94% 8.82%
27 9 13.24% 22.06% DATA ANALYSIS:
28 11 16.18% 38.24% Mean Speed: 30
29 9 13.24% 51.47% Standard Deviation: 3
30 9 13.24% 64.71% Standard error of the mean: 0.36
31 8 11.76% 76.47% 50th Percentile: 29
32 2 2.94% 79.41% 85th Percentile: 33
33 5 7.35% 86.76% 97th Percentile: 37
34 3 4.41% 91.18% 10 Mile Pace: 25 to 34
35 1 1.47% 92.65% % of Samples in 10-Mile Pace: 88.24%
36 2 2.94% 95.59% Comments:
37 3 4.41% 100.00%
38 0 0.00% 100.00%
39 0 0.00% 100.00%
40 0 0.00% 100.00%
41 0 0.00% 100.00%
42 0 0.00% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 68 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF PALMDALE - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Milling Avenue
Location: at Trevor
Between: Yucca Ave to Division St Ref. # 38
Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:40 To 1:40
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 38
29 0 0.00% 0.00% Standard Deviation: 3
30 1 0.90% 0.90% Standard error of the mean: 0.28
31 0 0.00% 0.90% 50th Percentile: 38
32 2 1.80% 2.70% 85th Percentile: 42
33 5 4.50% 7.21% 97th Percentile: 45
34 7 6.31% 13.51% 10 Mile Pace: 33 to 42
35 7 6.31% 19.82% % of Samples in 10-Mile Pace: 89.19%
36 15 13.51% 33.33% Comments:
37 11 9.91% 43.24%
38 10 9.01% 52.25%
39 14 12.61% 64.86%
40 9 8.11% 72.97%
41 10 9.01% 81.98%
42 11 9.91% 91.89%
43 2 1.80% 93.69%
44 3 2.70% 96.40%
45 1 0.90% 97.30%
46 2 1.80% 99.10%
47 0 0.00% 99.10%
48 0 0.00% 99.10%
49 0 0.00% 99.10%
50 0 0.00% 99.10%
51 1 0.90% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 111 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF PALMDALE - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J
Location: at 55th Street W
Between: 60th Street West to 50th Street West Ref. # 40 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:30 To 4:00
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 55
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.4
31 0 0.00% 0.00% 50th Percentile: 55
32 0 0.00% 0.00% 85th Percentile: 60
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 52 to 61
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 68.79%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 0 0.00% 0.00%
43 0 0.00% 0.00%
44 1 0.64% 0.64%
45 3 1.91% 2.55%
46 4 2.55% 5.10%
47 5 3.18% 8.28%
48 7 4.46% 12.74%
49 8 5.10% 17.83%
50 1 0.64% 18.47%
51 6 3.82% 22.29%
52 9 5.73% 28.03%
53 10 6.37% 34.39%
54 13 8.28% 42.68%
55 15 9.55% 52.23%
56 17 10.83% 63.06%
57 5 3.18% 66.24%
58 11 7.01% 73.25%
59 13 8.28% 81.53%
60 8 5.10% 86.62%
61 7 4.46% 91.08%
62 5 3.18% 94.27%
63 2 1.27% 95.54%
64 1 0.64% 96.18%
65 2 1.27% 97.45%
66 2 1.27% 98.73%
67 1 0.64% 99.36%
68 1 0.64% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 157 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J
Location: at 45th Street W
Between: 50th Street West to 40th Street West Ref. # 41 Cumulative Date: 10/20/2021 Day: Wdnesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 4:05 To 4:35
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 51
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.32
31 0 0.00% 0.00% 50th Percentile: 50
32 0 0.00% 0.00% 85th Percentile: 56
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 47 to 56
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 74.21%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 1 0.63% 0.63%
41 0 0.00% 0.63%
42 2 1.26% 1.89%
43 5 3.14% 5.03%
44 6 3.77% 8.81%
45 4 2.52% 11.32%
46 7 4.40% 15.72%
47 9 5.66% 21.38%
48 13 8.18% 29.56%
49 16 10.06% 39.62%
50 19 11.95% 51.57%
51 15 9.43% 61.01%
52 11 6.92% 67.92%
53 9 5.66% 73.58%
54 10 6.29% 79.87%
55 8 5.03% 84.91%
56 8 5.03% 89.94%
57 5 3.14% 93.08%
58 4 2.52% 95.60%
59 3 1.89% 97.48%
60 1 0.63% 98.11%
61 1 0.63% 98.74%
62 1 0.63% 99.37%
63 1 0.63% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
72 0 0.00% 100.00%
Total: 159 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J
Location: at Valley Center Way
Between: 25th Street West to 20th Street West Ref. # 44 Cumulative Date: 20-Oct Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:15 To 10:45
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 40
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.38
31 1 0.93% 0.93% 50th Percentile: 40
32 1 0.93% 1.85% 85th Percentile: 45
33 4 3.70% 5.56% 97th Percentile: 48
34 4 3.70% 9.26% 10 Mile Pace: 37 to 46
35 4 3.70% 12.96% % of Samples in 10-Mile Pace: 77.78%
36 4 3.70% 16.67% Comments:
37 11 10.19% 26.85%
38 7 6.48% 33.33%
39 11 10.19% 43.52%
40 11 10.19% 53.70%
41 10 9.26% 62.96%
42 8 7.41% 70.37%
43 7 6.48% 76.85%
44 6 5.56% 82.41%
45 8 7.41% 89.81%
46 5 4.63% 94.44%
47 2 1.85% 96.30%
48 2 1.85% 98.15%
49 0 0.00% 98.15%
50 0 0.00% 98.15%
51 1 0.93% 99.07%
52 1 0.93% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 108 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J
Location: at 17th Street West
Between: 20th Street West to 15th Street West Ref. # 45 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:50 To 11:20
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.3
31 0 0.00% 0.00% 50th Percentile: 41
32 1 0.56% 0.56% 85th Percentile: 45
33 1 0.56% 1.13% 97th Percentile: 50
34 0 0.00% 1.13% 10 Mile Pace: 36 to 45
35 3 1.69% 2.82% % of Samples in 10-Mile Pace: 84.18%
36 7 3.95% 6.78% Comments:
37 14 7.91% 14.69%
38 13 7.34% 22.03%
39 26 14.69% 36.72%
40 19 10.73% 47.46%
41 21 11.86% 59.32%
42 19 10.73% 70.06%
43 9 5.08% 75.14%
44 11 6.21% 81.36%
45 10 5.65% 87.01%
46 7 3.95% 90.96%
47 4 2.26% 93.22%
48 3 1.69% 94.92%
49 3 1.69% 96.61%
50 3 1.69% 98.31%
51 2 1.13% 99.44%
52 1 0.56% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 177 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J
Location: at Loneoak Ave
Between: 15th Street West to 10th Street West Ref. # 46 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:25 To 11:55
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.31
31 0 0.00% 0.00% 50th Percentile: 40
32 0 0.00% 0.00% 85th Percentile: 45
33 2 1.21% 1.21% 97th Percentile: 50
34 4 2.42% 3.64% 10 Mile Pace: 36 to 45
35 1 0.61% 4.24% % of Samples in 10-Mile Pace: 81.21%
36 23 13.94% 18.18% Comments:
37 14 8.48% 26.67%
38 18 10.91% 37.58%
39 18 10.91% 48.48%
40 11 6.67% 55.15%
41 9 5.45% 60.61%
42 19 11.52% 72.12%
43 7 4.24% 76.36%
44 8 4.85% 81.21%
45 7 4.24% 85.45%
46 11 6.67% 92.12%
47 5 3.03% 95.15%
48 2 1.21% 96.36%
49 1 0.61% 96.97%
50 1 0.61% 97.58%
51 1 0.61% 98.18%
52 1 0.61% 98.79%
53 0 0.00% 98.79%
54 1 0.61% 99.39%
55 0 0.00% 99.39%
56 1 0.61% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 165 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J
Location: at 25th St E
Between: 20th Street East to 30th Street East Ref. # 53 Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:50 To 11:20
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 50
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.34
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 54
33 0 0.00% 0.00% 97th Percentile: 57
34 0 0.00% 0.00% 10 Mile Pace: 46 to 55
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 78.99%
36 0 0.00% 0.00% Comments:
37 1 0.72% 0.72%
38 0 0.00% 0.72%
39 1 0.72% 1.45%
40 1 0.72% 2.17%
41 1 0.72% 2.90%
42 3 2.17% 5.07%
43 1 0.72% 5.80%
44 4 2.90% 8.70%
45 6 4.35% 13.04%
46 14 10.14% 23.19%
47 7 5.07% 28.26%
48 7 5.07% 33.33%
49 23 16.67% 50.00%
50 6 4.35% 54.35%
51 8 5.80% 60.14%
52 14 10.14% 70.29%
53 11 7.97% 78.26%
54 10 7.25% 85.51%
55 9 6.52% 92.03%
56 6 4.35% 96.38%
57 1 0.72% 97.10%
58 2 1.45% 98.55%
59 0 0.00% 98.55%
60 0 0.00% 98.55%
61 1 0.72% 99.28%
62 0 0.00% 99.28%
63 0 0.00% 99.28%
64 0 0.00% 99.28%
65 0 0.00% 99.28%
66 0 0.00% 99.28%
67 1 0.72% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 138 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J-8
Location: at 62nd St W
Between: 65th Street West to 57th Street West Ref. # 55 Cumulative Date: 10/28/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:30 To 11:40
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 42
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.44
31 0 0.00% 0.00% 50th Percentile: 40
32 0 0.00% 0.00% 85th Percentile: 46
33 0 0.00% 0.00% 97th Percentile: 52
34 0 0.00% 0.00% 10 Mile Pace: 37 to 46
35 2 2.38% 2.38% % of Samples in 10-Mile Pace: 84.52%
36 0 0.00% 2.38% Comments:
37 5 5.95% 8.33%
38 11 13.10% 21.43%
39 13 15.48% 36.90%
40 12 14.29% 51.19%
41 7 8.33% 59.52%
42 5 5.95% 65.48%
43 6 7.14% 72.62%
44 5 5.95% 78.57%
45 2 2.38% 80.95%
46 5 5.95% 86.90%
47 1 1.19% 88.10%
48 2 2.38% 90.48%
49 1 1.19% 91.67%
50 2 2.38% 94.05%
51 1 1.19% 95.24%
52 3 3.57% 98.81%
53 0 0.00% 98.81%
54 0 0.00% 98.81%
55 1 1.19% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 84 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J-8
Location: at 47th Street West
Between: 50th Street West to 45th Street West Ref. # 57 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:50 To 3:25
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 50
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.62
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 56
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 44 to 53
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 62.77%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 1 1.06% 1.06%
39 1 1.06% 2.13%
40 3 3.19% 5.32%
41 2 2.13% 7.45%
42 3 3.19% 10.64%
43 4 4.26% 14.89%
44 5 5.32% 20.21%
45 3 3.19% 23.40%
46 7 7.45% 30.85%
47 3 3.19% 34.04%
48 8 8.51% 42.55%
49 7 7.45% 50.00%
50 5 5.32% 55.32%
51 7 7.45% 62.77%
52 7 7.45% 70.21%
53 7 7.45% 77.66%
54 0 0.00% 77.66%
55 3 3.19% 80.85%
56 5 5.32% 86.17%
57 1 1.06% 87.23%
58 3 3.19% 90.43%
59 3 3.19% 93.62%
60 1 1.06% 94.68%
61 1 1.06% 95.74%
62 1 1.06% 96.81%
63 0 0.00% 96.81%
64 0 0.00% 96.81%
65 1 1.06% 97.87%
66 0 0.00% 97.87%
67 1 1.06% 98.94%
68 0 0.00% 98.94%
69 1 1.06% 100.00%
70 0 0.00% 100.00%
Total: 94 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8 9Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J-8
Location: 1000 ft eo 45th St W
Between: 45th Street West to 40th Street West Ref. # 58 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:15 To 2:45
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 49
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.47
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 53
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 44 to 53
35 1 0.87% 0.87% % of Samples in 10-Mile Pace: 75.65%
36 0 0.00% 0.87% Comments:
37 0 0.00% 0.87%
38 0 0.00% 0.87%
39 1 0.87% 1.74%
40 1 0.87% 2.61%
41 1 0.87% 3.48%
42 5 4.35% 7.83%
43 2 1.74% 9.57%
44 2 1.74% 11.30%
45 7 6.09% 17.39%
46 8 6.96% 24.35%
47 11 9.57% 33.91%
48 12 10.43% 44.35%
49 12 10.43% 54.78%
50 10 8.70% 63.48%
51 9 7.83% 71.30%
52 9 7.83% 79.13%
53 7 6.09% 85.22%
54 2 1.74% 86.96%
55 0 0.00% 86.96%
56 3 2.61% 89.57%
57 5 4.35% 93.91%
58 2 1.74% 95.65%
59 3 2.61% 98.26%
60 0 0.00% 98.26%
61 0 0.00% 98.26%
62 0 0.00% 98.26%
63 1 0.87% 99.13%
64 0 0.00% 99.13%
65 0 0.00% 99.13%
66 0 0.00% 99.13%
67 0 0.00% 99.13%
68 0 0.00% 99.13%
69 0 0.00% 99.13%
71 1 0.87% 100.00%
Total: 115 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J-8
Location: at 37th St W
Between: 40th Street West to 35th Street West Ref. # 59 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:40 To 2:10
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.47
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 50
33 1 0.87% 0.87% 97th Percentile: 55
34 1 0.87% 1.74% 10 Mile Pace: 42 to 51
35 2 1.74% 3.48% % of Samples in 10-Mile Pace: 70.43%
36 0 0.00% 3.48% Comments:
37 0 0.00% 3.48%
38 6 5.22% 8.70%
39 6 5.22% 13.91%
40 6 5.22% 19.13%
41 3 2.61% 21.74%
42 9 7.83% 29.57%
43 12 10.43% 40.00%
44 4 3.48% 43.48%
45 11 9.57% 53.04%
46 12 10.43% 63.48%
47 7 6.09% 69.57%
48 6 5.22% 74.78%
49 10 8.70% 83.48%
50 6 5.22% 88.70%
51 4 3.48% 92.17%
52 1 0.87% 93.04%
53 1 0.87% 93.91%
54 1 0.87% 94.78%
55 3 2.61% 97.39%
56 1 0.87% 98.26%
57 0 0.00% 98.26%
58 0 0.00% 98.26%
59 1 0.87% 99.13%
60 0 0.00% 99.13%
61 0 0.00% 99.13%
62 0 0.00% 99.13%
63 1 0.87% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 115 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J-8
Location: at 32nd St W
Between: 35th Street West to 30th Street West Ref. # 60 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:40 To 1:20
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.46
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 50
33 0 0.00% 0.00% 97th Percentile: 54
34 1 0.85% 0.85% 10 Mile Pace: 40 to 49
35 0 0.00% 0.85% % of Samples in 10-Mile Pace: 75.42%
36 1 0.85% 1.69% Comments:
37 2 1.69% 3.39%
38 2 1.69% 5.08%
39 5 4.24% 9.32%
40 4 3.39% 12.71%
41 6 5.08% 17.80%
42 15 12.71% 30.51%
43 8 6.78% 37.29%
44 5 4.24% 41.53%
45 15 12.71% 54.24%
46 11 9.32% 63.56%
47 10 8.47% 72.03%
48 8 6.78% 78.81%
49 7 5.93% 84.75%
50 4 3.39% 88.14%
51 3 2.54% 90.68%
52 5 4.24% 94.92%
53 1 0.85% 95.76%
54 2 1.69% 97.46%
55 0 0.00% 97.46%
56 0 0.00% 97.46%
57 1 0.85% 98.31%
58 0 0.00% 98.31%
59 0 0.00% 98.31%
60 1 0.85% 99.15%
61 0 0.00% 99.15%
62 0 0.00% 99.15%
63 1 0.85% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 118 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J-8
Location: 500 ft eo 25th St W
Between: 30th Street West to 20th Street West Ref. # 61 Cumulative Date: 10/20/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:05 To 12:35
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.31
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 50
33 0 0.00% 0.00% 97th Percentile: 53
34 1 0.61% 0.61% 10 Mile Pace: 42 to 51
35 1 0.61% 1.23% % of Samples in 10-Mile Pace: 75.46%
36 3 1.84% 3.07% Comments:
37 0 0.00% 3.07%
38 4 2.45% 5.52%
39 7 4.29% 9.82%
40 7 4.29% 14.11%
41 6 3.68% 17.79%
42 17 10.43% 28.22%
43 8 4.91% 33.13%
44 16 9.82% 42.94%
45 14 8.59% 51.53%
46 19 11.66% 63.19%
47 12 7.36% 70.55%
48 10 6.13% 76.69%
49 11 6.75% 83.44%
50 8 4.91% 88.34%
51 8 4.91% 93.25%
52 5 3.07% 96.32%
53 3 1.84% 98.16%
54 1 0.61% 98.77%
55 0 0.00% 98.77%
56 1 0.61% 99.39%
57 0 0.00% 99.39%
58 1 0.61% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 163 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J-8
Location: E/o Palm Vista
Between: Challenger Way to 15th Street East Ref. # 66
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:00 To 9:30
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 5
30 3 2.54% 2.54% Standard error of the mean: 0.46
31 4 3.39% 5.93% 50th Percentile: 42
32 4 3.39% 9.32% 85th Percentile: 47
33 3 2.54% 11.86% 97th Percentile: 49
34 2 1.69% 13.56% 10 Mile Pace: 37 to 46
35 3 2.54% 16.10% % of Samples in 10-Mile Pace: 64.41%
36 3 2.54% 18.64% Comments:
37 8 6.78% 25.42%
38 6 5.08% 30.51%
39 10 8.47% 38.98%
40 3 2.54% 41.53%
41 5 4.24% 45.76%
42 10 8.47% 54.24%
43 7 5.93% 60.17%
44 9 7.63% 67.80%
45 10 8.47% 76.27%
46 8 6.78% 83.05%
47 7 5.93% 88.98%
48 2 1.69% 90.68%
49 8 6.78% 97.46%
50 1 0.85% 98.31%
51 0 0.00% 98.31%
52 0 0.00% 98.31%
53 0 0.00% 98.31%
54 2 1.69% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 118 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue J-8
Location: at 17th St E
Between: 15th Street to 20th Street East Ref. # 67
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:30 To 3:00
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.46
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 49
33 1 0.86% 0.86% 97th Percentile: 52
34 1 0.86% 1.72% 10 Mile Pace: 40 to 49
35 2 1.72% 3.45% % of Samples in 10-Mile Pace: 72.41%
36 2 1.72% 5.17% Comments:
37 5 4.31% 9.48%
38 4 3.45% 12.93%
39 5 4.31% 17.24%
40 7 6.03% 23.28%
41 6 5.17% 28.45%
42 11 9.48% 37.93%
43 4 3.45% 41.38%
44 5 4.31% 45.69%
45 8 6.90% 52.59%
46 13 11.21% 63.79%
47 12 10.34% 74.14%
48 7 6.03% 80.17%
49 11 9.48% 89.66%
50 4 3.45% 93.10%
51 3 2.59% 95.69%
52 3 2.59% 98.28%
53 2 1.72% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 116 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: at 65th St W
Between: 70th Street West to 60th Street West Ref. # 72 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:00 To 10:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 55
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.74
31 0 0.00% 0.00% 50th Percentile: 54
32 0 0.00% 0.00% 85th Percentile: 61
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 48 to 57
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 69.23%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 0 0.00% 0.00%
43 1 1.54% 1.54%
44 0 0.00% 1.54%
45 0 0.00% 1.54%
46 0 0.00% 1.54%
47 0 0.00% 1.54%
48 7 10.77% 12.31%
49 5 7.69% 20.00%
50 4 6.15% 26.15%
51 5 7.69% 33.85%
52 4 6.15% 40.00%
53 5 7.69% 47.69%
54 4 6.15% 53.85%
55 3 4.62% 58.46%
56 4 6.15% 64.62%
57 4 6.15% 70.77%
58 1 1.54% 72.31%
59 1 1.54% 73.85%
60 5 7.69% 81.54%
61 3 4.62% 86.15%
62 3 4.62% 90.77%
63 1 1.54% 92.31%
64 0 0.00% 92.31%
65 2 3.08% 95.38%
66 1 1.54% 96.92%
67 1 1.54% 98.46%
68 0 0.00% 98.46%
69 1 1.54% 100.00%
70 0 0.00% 100.00%
Total: 65 100%
spd_form.xls
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: at 55th St W
Between: 60th Street West to 50th Street West Ref. # 73 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:35 To 11:05
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 55
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.5
31 0 0.00% 0.00% 50th Percentile: 55
32 0 0.00% 0.00% 85th Percentile: 62
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 51 to 60
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 60.96%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 1 0.68% 0.68%
41 1 0.68% 1.37%
42 0 0.00% 1.37%
43 0 0.00% 1.37%
44 2 1.37% 2.74%
45 0 0.00% 2.74%
46 5 3.42% 6.16%
47 3 2.05% 8.22%
48 7 4.79% 13.01%
49 3 2.05% 15.07%
50 7 4.79% 19.86%
51 6 4.11% 23.97%
52 12 8.22% 32.19%
53 9 6.16% 38.36%
54 10 6.85% 45.21%
55 9 6.16% 51.37%
56 12 8.22% 59.59%
57 9 6.16% 65.75%
58 3 2.05% 67.81%
59 11 7.53% 75.34%
60 8 5.48% 80.82%
61 2 1.37% 82.19%
62 7 4.79% 86.99%
63 6 4.11% 91.10%
64 5 3.42% 94.52%
65 3 2.05% 96.58%
66 3 2.05% 98.63%
67 1 0.68% 99.32%
68 1 0.68% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 146 100%
spd_form.xls
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: 500' w/o 45th St W
Between: 50th Street West to 45th Street West Ref. # 74 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:08 To 11:38
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 47
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.54
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 53
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 40 to 49
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 66.67%
36 0 0.00% 0.00% Comments:
37 3 2.44% 2.44%
38 2 1.63% 4.07%
39 4 3.25% 7.32%
40 3 2.44% 9.76%
41 5 4.07% 13.82%
42 9 7.32% 21.14%
43 13 10.57% 31.71%
44 17 13.82% 45.53%
45 12 9.76% 55.28%
46 6 4.88% 60.16%
47 5 4.07% 64.23%
48 7 5.69% 69.92%
49 5 4.07% 73.98%
50 3 2.44% 76.42%
51 5 4.07% 80.49%
52 5 4.07% 84.55%
53 4 3.25% 87.80%
54 1 0.81% 88.62%
55 3 2.44% 91.06%
56 4 3.25% 94.31%
57 2 1.63% 95.93%
58 0 0.00% 95.93%
59 2 1.63% 97.56%
60 2 1.63% 99.19%
61 0 0.00% 99.19%
62 0 0.00% 99.19%
63 1 0.81% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 123 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: at Westfield Estates
Between: 25th Street West to 20th Street West Ref. # 80 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:45 To 12:15
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 50
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.34
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 55
33 0 0.00% 0.00% 97th Percentile: 60
34 0 0.00% 0.00% 10 Mile Pace: 44 to 53
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 71.63%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 2 0.93% 0.93%
39 3 1.40% 2.33%
40 3 1.40% 3.72%
41 2 0.93% 4.65%
42 6 2.79% 7.44%
43 3 1.40% 8.84%
44 8 3.72% 12.56%
45 14 6.51% 19.07%
46 17 7.91% 26.98%
47 17 7.91% 34.88%
48 13 6.05% 40.93%
49 20 9.30% 50.23%
50 20 9.30% 59.53%
51 14 6.51% 66.05%
52 19 8.84% 74.88%
53 12 5.58% 80.47%
54 6 2.79% 83.26%
55 6 2.79% 86.05%
56 9 4.19% 90.23%
57 4 1.86% 92.09%
58 3 1.40% 93.49%
59 3 1.40% 94.88%
60 5 2.33% 97.21%
61 3 1.40% 98.60%
62 1 0.47% 99.07%
63 0 0.00% 99.07%
64 1 0.47% 99.53%
65 0 0.00% 99.53%
66 0 0.00% 99.53%
67 1 0.47% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 215 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: at Century 21 Parking lot
Between: 20th Street West to 17th Street West Ref. # 81 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:25 To 12:50
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 3 1.34% 1.34%
27 9 4.02% 5.36% DATA ANALYSIS:
28 11 4.91% 10.27% Mean Speed: 36
29 12 5.36% 15.63% Standard Deviation: 6
30 10 4.46% 20.09% Standard error of the mean: 0.4
31 8 3.57% 23.66% 50th Percentile: 36
32 12 5.36% 29.02% 85th Percentile: 43
33 14 6.25% 35.27% 97th Percentile: 49
34 10 4.46% 39.73% 10 Mile Pace: 32 to 41
35 10 4.46% 44.20% % of Samples in 10-Mile Pace: 56.25% 36 16 7.14% 51.34% Comments:
37 14 6.25% 57.59%
38 9 4.02% 61.61%
39 18 8.04% 69.64%
40 14 6.25% 75.89%
41 9 4.02% 79.91%
42 6 2.68% 82.59%
43 8 3.57% 86.16%
44 7 3.13% 89.29%
45 7 3.13% 92.41%
46 4 1.79% 94.20%
47 3 1.34% 95.54%
48 2 0.89% 96.43%
49 4 1.79% 98.21%
50 1 0.45% 98.66%
51 1 0.45% 99.11%
52 2 0.89% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 224 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: 700' e/o 17th St W
Between: 17th Street West to 15th Street West Ref. # 82 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:00 To 1:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 5 2.43% 2.43%
26 21 10.19% 12.62%
27 11 5.34% 17.96% DATA ANALYSIS:
28 13 6.31% 24.27% Mean Speed: 34
29 9 4.37% 28.64% Standard Deviation: 6
30 4 1.94% 30.58% Standard error of the mean: 0.42
31 4 1.94% 32.52% 50th Percentile: 34
32 14 6.80% 39.32% 85th Percentile: 40
33 13 6.31% 45.63% 97th Percentile: 44
34 14 6.80% 52.43% 10 Mile Pace: 31 to 40
35 12 5.83% 58.25% % of Samples in 10-Mile Pace: 57.28% 36 21 10.19% 68.45% Comments:
37 11 5.34% 73.79%
38 11 5.34% 79.13%
39 11 5.34% 84.47%
40 7 3.40% 87.86%
41 4 1.94% 89.81%
42 8 3.88% 93.69%
43 4 1.94% 95.63%
44 3 1.46% 97.09%
45 2 0.97% 98.06%
46 2 0.97% 99.03%
47 0 0.00% 99.03%
48 1 0.49% 99.51%
49 0 0.00% 99.51%
50 0 0.00% 99.51%
51 0 0.00% 99.51%
52 0 0.00% 99.51%
53 0 0.00% 99.51%
54 1 0.49% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 206 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: at 12th St W
Between: 15th Street West to 10th Street West Ref. # 83 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:35 To 2:00
21 8 5.76% 5.76% Recorder: DA
22 12 8.63% 14.39% Posted Speed: 35
23 7 5.04% 19.42% Remarks:
24 12 8.63% 28.06%
25 6 4.32% 32.37%
26 21 15.11% 47.48%
27 16 11.51% 58.99% DATA ANALYSIS:
28 9 6.47% 65.47% Mean Speed: 28
29 8 5.76% 71.22% Standard Deviation: 4
30 7 5.04% 76.26% Standard error of the mean: 0.34
31 6 4.32% 80.58% 50th Percentile: 27
32 6 4.32% 84.89% 85th Percentile: 33
33 5 3.60% 88.49% 97th Percentile: 36
34 3 2.16% 90.65% 10 Mile Pace: 21 to 30
35 4 2.88% 93.53% % of Samples in 10-Mile Pace: 76.26%
36 5 3.60% 97.12% Comments:
37 1 0.72% 97.84%
38 1 0.72% 98.56%
39 0 0.00% 98.56%
40 1 0.72% 99.28%
41 1 0.72% 100.00%
42 0 0.00% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 139 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: at 25th E
Between: 20th Street East to 30th Street East Ref. # 91 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:10 To 2:35
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 51
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.41
31 0 0.00% 0.00% 50th Percentile: 50
32 0 0.00% 0.00% 85th Percentile: 56
33 0 0.00% 0.00% 97th Percentile: 61
34 0 0.00% 0.00% 10 Mile Pace: 46 to 55
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 71.14%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 2 1.34% 1.34%
43 3 2.01% 3.36%
44 6 4.03% 7.38%
45 7 4.70% 12.08%
46 10 6.71% 18.79%
47 11 7.38% 26.17%
48 10 6.71% 32.89%
49 13 8.72% 41.61%
50 13 8.72% 50.34%
51 12 8.05% 58.39%
52 11 7.38% 65.77%
53 10 6.71% 72.48%
54 7 4.70% 77.18%
55 9 6.04% 83.22%
56 5 3.36% 86.58%
57 6 4.03% 90.60%
58 4 2.68% 93.29%
59 3 2.01% 95.30%
60 2 1.34% 96.64%
61 2 1.34% 97.99%
62 2 1.34% 99.33%
63 1 0.67% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 149 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: at 32nd St E
Between: 30th Street East to 35th Street East Ref. # 92 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:38 To 3:00
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 49
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.47
31 0 0.00% 0.00% 50th Percentile: 48
32 0 0.00% 0.00% 85th Percentile: 54
33 0 0.00% 0.00% 97th Percentile: 64
34 0 0.00% 0.00% 10 Mile Pace: 45 to 54
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 67.68%
36 3 1.83% 1.83% Comments:
37 1 0.61% 2.44%
38 4 2.44% 4.88%
39 5 3.05% 7.93%
40 2 1.22% 9.15%
41 4 2.44% 11.59%
42 8 4.88% 16.46%
43 1 0.61% 17.07%
44 5 3.05% 20.12%
45 11 6.71% 26.83%
46 17 10.37% 37.20%
47 11 6.71% 43.90%
48 10 6.10% 50.00%
49 15 9.15% 59.15%
50 11 6.71% 65.85%
51 4 2.44% 68.29%
52 16 9.76% 78.05%
53 7 4.27% 82.32%
54 9 5.49% 87.80%
55 3 1.83% 89.63%
56 4 2.44% 92.07%
57 1 0.61% 92.68%
58 1 0.61% 93.29%
59 3 1.83% 95.12%
60 0 0.00% 95.12%
61 3 1.83% 96.95%
62 0 0.00% 96.95%
63 0 0.00% 96.95%
64 1 0.61% 97.56%
65 0 0.00% 97.56%
66 2 1.22% 98.78%
67 0 0.00% 98.78%
68 2 1.22% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 164 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K
Location: at Devyn
Between: 35th Street East to 40th Street East Ref. # 93 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:05 To 3:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 50
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.36
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 55
33 0 0.00% 0.00% 97th Percentile: 61
34 0 0.00% 0.00% 10 Mile Pace: 45 to 54
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 71.28%
36 0 0.00% 0.00% Comments:
37 1 0.51% 0.51%
38 0 0.00% 0.51%
39 3 1.54% 2.05%
40 1 0.51% 2.56%
41 1 0.51% 3.08%
42 3 1.54% 4.62%
43 8 4.10% 8.72%
44 6 3.08% 11.79%
45 9 4.62% 16.41%
46 20 10.26% 26.67%
47 10 5.13% 31.79%
48 16 8.21% 40.00%
49 27 13.85% 53.85%
50 15 7.69% 61.54%
51 10 5.13% 66.67%
52 17 8.72% 75.38%
53 7 3.59% 78.97%
54 8 4.10% 83.08%
55 5 2.56% 85.64%
56 11 5.64% 91.28%
57 5 2.56% 93.85%
58 2 1.03% 94.87%
59 2 1.03% 95.90%
60 2 1.03% 96.92%
61 1 0.51% 97.44%
62 0 0.00% 97.44%
63 0 0.00% 97.44%
64 1 0.51% 97.95%
65 1 0.51% 98.46%
66 2 1.03% 99.49%
67 0 0.00% 99.49%
68 1 0.51% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 195 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Commerce Center Drive
Location: at Sol Plaza
Between: 12th Street West to 10th Street West Ref. # 94 Cumulative Date: 11/10/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:10 To 10:45
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 30
23 1 0.85% 0.85% Remarks:
24 1 0.85% 1.71%
25 1 0.85% 2.56%
26 11 9.40% 11.97%
27 7 5.98% 17.95% DATA ANALYSIS:
28 17 14.53% 32.48% Mean Speed: 31
29 14 11.97% 44.44% Standard Deviation: 4
30 15 12.82% 57.26% Standard error of the mean: 0.37
31 10 8.55% 65.81% 50th Percentile: 30
32 14 11.97% 77.78% 85th Percentile: 34
33 7 5.98% 83.76% 97th Percentile: 41
34 3 2.56% 86.32% 10 Mile Pace: 26 to 35
35 3 2.56% 88.89% % of Samples in 10-Mile Pace: 86.32%
36 4 3.42% 92.31% Comments:
37 2 1.71% 94.02%
38 1 0.85% 94.87%
39 0 0.00% 94.87%
40 2 1.71% 96.58%
41 1 0.85% 97.44%
42 1 0.85% 98.29%
43 0 0.00% 98.29%
44 0 0.00% 98.29%
45 1 0.85% 99.15%
46 0 0.00% 99.15%
47 0 0.00% 99.15%
48 0 0.00% 99.15%
49 0 0.00% 99.15%
50 0 0.00% 99.15%
51 1 0.85% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 117 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K-4
Location: Midpoint btw10th W and Gadsden
Between: 10th Street West to Gadsden Ref. # 95
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:50 To 2:40
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 35
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 1 0.93% 0.93% DATA ANALYSIS:
28 0 0.00% 0.93% Mean Speed: 36
29 3 2.78% 3.70% Standard Deviation: 4
30 2 1.85% 5.56% Standard error of the mean: 0.38
31 3 2.78% 8.33% 50th Percentile: 35
32 7 6.48% 14.81% 85th Percentile: 40
33 8 7.41% 22.22% 97th Percentile: 45
34 17 15.74% 37.96% 10 Mile Pace: 32 to 41
35 15 13.89% 51.85% % of Samples in 10-Mile Pace: 81.48% 36 13 12.04% 63.89% Comments:
37 9 8.33% 72.22%
38 5 4.63% 76.85%
39 5 4.63% 81.48%
40 5 4.63% 86.11%
41 4 3.70% 89.81%
42 4 3.70% 93.52%
43 1 0.93% 94.44%
44 2 1.85% 96.30%
45 1 0.93% 97.22%
46 2 1.85% 99.07%
47 1 0.93% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 108 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K-4
Location: at Copland
Between: Division to 5th Street East Ref. # 96
Cumulative Date: 2/16/2022 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:30 To 11:30
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 30
23 2 1.75% 1.75% Remarks:
24 3 2.63% 4.39%
25 6 5.26% 9.65%
26 4 3.51% 13.16%
27 8 7.02% 20.18% DATA ANALYSIS:
28 4 3.51% 23.68% Mean Speed: 31
29 9 7.89% 31.58% Standard Deviation: 4
30 11 9.65% 41.23% Standard error of the mean: 0.37
31 11 9.65% 50.88% 50th Percentile: 31
32 14 12.28% 63.16% 85th Percentile: 36
33 12 10.53% 73.68% 97th Percentile: 40
34 4 3.51% 77.19% 10 Mile Pace: 27 to 36
35 8 7.02% 84.21% % of Samples in 10-Mile Pace: 75.44%
36 5 4.39% 88.60% Comments:
37 3 2.63% 91.23%
38 2 1.75% 92.98%
39 3 2.63% 95.61%
40 3 2.63% 98.25%
41 2 1.75% 100.00%
42 0 0.00% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 114 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K-6
Location: at 251 Avenue K-6
Between: Division to 5th Street East Ref. # 97
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:00 To 1:35
21 0 0.00% 0.00% Recorder: EY
22 2 1.42% 1.42% Posted Speed: 30
23 0 0.00% 1.42% Remarks:
24 0 0.00% 1.42%
25 7 4.96% 6.38%
26 7 4.96% 11.35%
27 9 6.38% 17.73% DATA ANALYSIS:
28 11 7.80% 25.53% Mean Speed: 32
29 19 13.48% 39.01% Standard Deviation: 5
30 17 12.06% 51.06% Standard error of the mean: 0.42
31 8 5.67% 56.74% 50th Percentile: 30
32 11 7.80% 64.54% 85th Percentile: 37
33 9 6.38% 70.92% 97th Percentile: 42
34 10 7.09% 78.01% 10 Mile Pace: 25 to 34
35 3 2.13% 80.14% % of Samples in 10-Mile Pace: 76.60%
36 5 3.55% 83.69% Comments:
37 4 2.84% 86.52%
38 5 3.55% 90.07%
39 4 2.84% 92.91%
40 3 2.13% 95.04%
41 2 1.42% 96.45%
42 2 1.42% 97.87%
43 1 0.71% 98.58%
44 1 0.71% 99.29%
45 1 0.71% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 141 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K-8
Location: 300 feet west of 60th Street West
Between: 62nd Street West to 60th Street West Ref. # 98 Cumulative Date: 12/15/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:30 To 10:45
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 39
29 0 0.00% 0.00% Standard Deviation: 4
30 3 4.11% 4.11% Standard error of the mean: 0.47
31 1 1.37% 5.48% 50th Percentile: 39
32 1 1.37% 6.85% 85th Percentile: 43
33 1 1.37% 8.22% 97th Percentile: 45
34 2 2.74% 10.96% 10 Mile Pace: 34 to 43
35 4 5.48% 16.44% % of Samples in 10-Mile Pace: 82.19%
36 5 6.85% 23.29% Comments:
37 5 6.85% 30.14%
38 8 10.96% 41.10%
39 13 17.81% 58.90%
40 9 12.33% 71.23%
41 6 8.22% 79.45%
42 4 5.48% 84.93%
43 4 5.48% 90.41%
44 2 2.74% 93.15%
45 4 5.48% 98.63%
46 0 0.00% 98.63%
47 0 0.00% 98.63%
48 0 0.00% 98.63%
49 1 1.37% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 73 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K-8
Location: at 33rd St W
Between: 35th Street West to 30th Street West Ref. # 99 Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:17 To 4:10
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 46
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.38
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 49
33 0 0.00% 0.00% 97th Percentile: 55
34 0 0.00% 0.00% 10 Mile Pace: 40 to 49
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 79.46%
36 1 0.89% 0.89% Comments:
37 0 0.00% 0.89%
38 3 2.68% 3.57%
39 3 2.68% 6.25%
40 5 4.46% 10.71%
41 3 2.68% 13.39%
42 9 8.04% 21.43%
43 9 8.04% 29.46%
44 13 11.61% 41.07%
45 13 11.61% 52.68%
46 13 11.61% 64.29%
47 9 8.04% 72.32%
48 8 7.14% 79.46%
49 7 6.25% 85.71%
50 1 0.89% 86.61%
51 2 1.79% 88.39%
52 4 3.57% 91.96%
53 3 2.68% 94.64%
54 2 1.79% 96.43%
55 2 1.79% 98.21%
56 0 0.00% 98.21%
57 1 0.89% 99.11%
58 1 0.89% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 112 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K-8
Location: at Market Pl
Between: Division to 5th Street East Ref. # 103
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:25 To 12:20
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 1 0.88% 0.88% Mean Speed: 43
29 1 0.88% 1.75% Standard Deviation: 6
30 0 0.00% 1.75% Standard error of the mean: 0.56
31 0 0.00% 1.75% 50th Percentile: 43
32 1 0.88% 2.63% 85th Percentile: 48
33 1 0.88% 3.51% 97th Percentile: 54
34 0 0.00% 3.51% 10 Mile Pace: 37 to 46
35 8 7.02% 10.53% % of Samples in 10-Mile Pace: 66.67%
36 0 0.00% 10.53% Comments:
37 6 5.26% 15.79%
38 11 9.65% 25.44%
39 6 5.26% 30.70%
40 3 2.63% 33.33%
41 8 7.02% 40.35%
42 10 8.77% 49.12%
43 9 7.89% 57.02%
44 4 3.51% 60.53%
45 10 8.77% 69.30%
46 9 7.89% 77.19%
47 6 5.26% 82.46%
48 5 4.39% 86.84%
49 2 1.75% 88.60%
50 6 5.26% 93.86%
51 0 0.00% 93.86%
52 1 0.88% 94.74%
53 1 0.88% 95.61%
54 2 1.75% 97.37%
55 2 1.75% 99.12%
56 0 0.00% 99.12%
57 0 0.00% 99.12%
58 0 0.00% 99.12%
59 0 0.00% 99.12%
60 1 0.88% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 114 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue K-8
Location: at 8th St E
Between: 5th Street East to Challenger Ref. # 104
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:15 To 10:46
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 1 1.19% 1.19% Mean Speed: 40
29 0 0.00% 1.19% Standard Deviation: 5
30 1 1.19% 2.38% Standard error of the mean: 0.55
31 0 0.00% 2.38% 50th Percentile: 40
32 2 2.38% 4.76% 85th Percentile: 44
33 4 4.76% 9.52% 97th Percentile: 48
34 0 0.00% 9.52% 10 Mile Pace: 35 to 44
35 7 8.33% 17.86% % of Samples in 10-Mile Pace: 78.57%
36 4 4.76% 22.62% Comments:
37 4 4.76% 27.38%
38 5 5.95% 33.33%
39 12 14.29% 47.62%
40 7 8.33% 55.95%
41 7 8.33% 64.29%
42 10 11.90% 76.19%
43 5 5.95% 82.14%
44 5 5.95% 88.10%
45 3 3.57% 91.67%
46 2 2.38% 94.05%
47 1 1.19% 95.24%
48 2 2.38% 97.62%
49 0 0.00% 97.62%
50 0 0.00% 97.62%
51 0 0.00% 97.62%
52 0 0.00% 97.62%
53 0 0.00% 97.62%
54 2 2.38% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 84 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L
Location: 500' w/o 22nd W
Between: 30th Street West to 20th Street West Ref. # 109 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:00 To 1:30
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 51
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.32
31 0 0.00% 0.00% 50th Percentile: 50
32 0 0.00% 0.00% 85th Percentile: 56
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 46 to 55
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 73.08%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 1 0.64% 0.64%
41 0 0.00% 0.64%
42 0 0.00% 0.64%
43 2 1.28% 1.92%
44 7 4.49% 6.41%
45 3 1.92% 8.33%
46 8 5.13% 13.46%
47 9 5.77% 19.23%
48 10 6.41% 25.64%
49 21 13.46% 39.10%
50 17 10.90% 50.00%
51 12 7.69% 57.69%
52 15 9.62% 67.31%
53 7 4.49% 71.79%
54 9 5.77% 77.56%
55 6 3.85% 81.41%
56 8 5.13% 86.54%
57 6 3.85% 90.38%
58 3 1.92% 92.31%
59 9 5.77% 98.08%
60 1 0.64% 98.72%
61 1 0.64% 99.36%
62 1 0.64% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 156 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L
Location: at 17th St W
Between: 20th Street West to 15th Street West Ref. # 110 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:35 To 2:05
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 50
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.39
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 56
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 44 to 53
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 72.02%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 1 0.60% 0.60%
39 0 0.00% 0.60%
40 0 0.00% 0.60%
41 0 0.00% 0.60%
42 1 0.60% 1.19%
43 4 2.38% 3.57%
44 7 4.17% 7.74%
45 9 5.36% 13.10%
46 18 10.71% 23.81%
47 8 4.76% 28.57%
48 15 8.93% 37.50%
49 21 12.50% 50.00%
50 9 5.36% 55.36%
51 13 7.74% 63.10%
52 12 7.14% 70.24%
53 9 5.36% 75.60%
54 6 3.57% 79.17%
55 7 4.17% 83.33%
56 9 5.36% 88.69%
57 5 2.98% 91.67%
58 6 3.57% 95.24%
59 4 2.38% 97.62%
60 4 2.38% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 168 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L
Location: w/o Ramp SR-14
Between: 15th Street West to 10th Street West Ref. # 111 Cumulative Date: 11/17/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 8:45/3:00 To 9:10/3:20
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.35
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 49
33 0 0.00% 0.00% 97th Percentile: 52
34 0 0.00% 0.00% 10 Mile Pace: 41 to 50
35 1 0.76% 0.76% % of Samples in 10-Mile Pace: 81.06%
36 2 1.52% 2.27% Comments:
37 2 1.52% 3.79%
38 4 3.03% 6.82%
39 3 2.27% 9.09%
40 5 3.79% 12.88%
41 9 6.82% 19.70%
42 13 9.85% 29.55%
43 10 7.58% 37.12%
44 13 9.85% 46.97%
45 7 5.30% 52.27%
46 12 9.09% 61.36%
47 13 9.85% 71.21%
48 12 9.09% 80.30%
49 11 8.33% 88.64%
50 7 5.30% 93.94%
51 2 1.52% 95.45%
52 5 3.79% 99.24%
53 0 0.00% 99.24%
54 0 0.00% 99.24%
55 0 0.00% 99.24%
56 0 0.00% 99.24%
57 1 0.76% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 132 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L
Location: e/o 6th St W
Between: 10th Street West to Sierra Highway Ref. # 112
Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:10 To 2:40
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 55
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.39
31 0 0.00% 0.00% 50th Percentile: 55
32 0 0.00% 0.00% 85th Percentile: 60
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 49 to 58
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 67.68%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 0 0.00% 0.00%
43 2 1.22% 1.22%
44 0 0.00% 1.22%
45 2 1.22% 2.44%
46 8 4.88% 7.32%
47 2 1.22% 8.54%
48 3 1.83% 10.37%
49 11 6.71% 17.07%
50 6 3.66% 20.73%
51 9 5.49% 26.22%
52 17 10.37% 36.59%
53 10 6.10% 42.68%
54 11 6.71% 49.39%
55 14 8.54% 57.93%
56 15 9.15% 67.07%
57 7 4.27% 71.34%
58 11 6.71% 78.05%
59 7 4.27% 82.32%
60 6 3.66% 85.98%
61 4 2.44% 88.41%
62 6 3.66% 92.07%
63 4 2.44% 94.51%
64 4 2.44% 96.95%
65 1 0.61% 97.56%
66 2 1.22% 98.78%
67 1 0.61% 99.39%
68 1 0.61% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 164 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L
Location: at 5th St E, Business Pkwy
Between: Sierra Highway to Challenger Ref. # 113
Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:35 To 4:05
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 53
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.35
31 0 0.00% 0.00% 50th Percentile: 53
32 0 0.00% 0.00% 85th Percentile: 57
33 0 0.00% 0.00% 97th Percentile: 64
34 0 0.00% 0.00% 10 Mile Pace: 48 to 57
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 82.09%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 0 0.00% 0.00%
43 2 1.49% 1.49%
44 0 0.00% 1.49%
45 1 0.75% 2.24%
46 1 0.75% 2.99%
47 4 2.99% 5.97%
48 7 5.22% 11.19%
49 8 5.97% 17.16%
50 12 8.96% 26.12%
51 9 6.72% 32.84%
52 11 8.21% 41.04%
53 13 9.70% 50.75%
54 15 11.19% 61.94%
55 10 7.46% 69.40%
56 18 13.43% 82.84%
57 7 5.22% 88.06%
58 3 2.24% 90.30%
59 6 4.48% 94.78%
60 1 0.75% 95.52%
61 1 0.75% 96.27%
62 0 0.00% 96.27%
63 0 0.00% 96.27%
64 2 1.49% 97.76%
65 0 0.00% 97.76%
66 2 1.49% 99.25%
67 0 0.00% 99.25%
68 1 0.75% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 134 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L
Location: at Soccer Center
Between: 30th Street East to 35th Street East Ref. # 114 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:50 To 3:30
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 52
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.48
31 0 0.00% 0.00% 50th Percentile: 51
32 0 0.00% 0.00% 85th Percentile: 56
33 0 0.00% 0.00% 97th Percentile: 61
34 0 0.00% 0.00% 10 Mile Pace: 47 to 56
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 76.64%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 1 0.93% 0.93%
43 4 3.74% 4.67%
44 4 3.74% 8.41%
45 1 0.93% 9.35%
46 0 0.00% 9.35%
47 8 7.48% 16.82%
48 6 5.61% 22.43%
49 12 11.21% 33.64%
50 10 9.35% 42.99%
51 9 8.41% 51.40%
52 8 7.48% 58.88%
53 12 11.21% 70.09%
54 4 3.74% 73.83%
55 7 6.54% 80.37%
56 6 5.61% 85.98%
57 3 2.80% 88.79%
58 1 0.93% 89.72%
59 4 3.74% 93.46%
60 1 0.93% 94.39%
61 3 2.80% 97.20%
62 0 0.00% 97.20%
63 2 1.87% 99.07%
64 1 0.93% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 107 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L-8
Location: at Round Hill Dr
Between: 75th Street West to 70th Street West Ref. # 115 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:45 To 12:48
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.39
31 0 0.00% 0.00% 50th Percentile: 43
32 0 0.00% 0.00% 85th Percentile: 48
33 0 0.00% 0.00% 97th Percentile: 52
34 0 0.00% 0.00% 10 Mile Pace: 38 to 47
35 1 0.96% 0.96% % of Samples in 10-Mile Pace: 74.04%
36 1 0.96% 1.92% Comments:
37 5 4.81% 6.73%
38 6 5.77% 12.50%
39 10 9.62% 22.12%
40 7 6.73% 28.85%
41 9 8.65% 37.50%
42 7 6.73% 44.23%
43 7 6.73% 50.96%
44 4 3.85% 54.81%
45 6 5.77% 60.58%
46 10 9.62% 70.19%
47 11 10.58% 80.77%
48 6 5.77% 86.54%
49 6 5.77% 92.31%
50 1 0.96% 93.27%
51 1 0.96% 94.23%
52 3 2.88% 97.12%
53 1 0.96% 98.08%
54 0 0.00% 98.08%
55 2 1.92% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 104 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L-8
Location: at Maytern Ave
Between: 67th Street West to 60th Street West Ref. # 116 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:40 To 11:40
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 47
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.58
31 0 0.00% 0.00% 50th Percentile: 46
32 0 0.00% 0.00% 85th Percentile: 54
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 43 to 52
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 60.19%
36 0 0.00% 0.00% Comments:
37 2 1.85% 1.85%
38 2 1.85% 3.70%
39 8 7.41% 11.11%
40 3 2.78% 13.89%
41 3 2.78% 16.67%
42 3 2.78% 19.44%
43 12 11.11% 30.56%
44 9 8.33% 38.89%
45 5 4.63% 43.52%
46 7 6.48% 50.00%
47 3 2.78% 52.78%
48 3 2.78% 55.56%
49 11 10.19% 65.74%
50 3 2.78% 68.52%
51 7 6.48% 75.00%
52 5 4.63% 79.63%
53 4 3.70% 83.33%
54 6 5.56% 88.89%
55 2 1.85% 90.74%
56 3 2.78% 93.52%
57 1 0.93% 94.44%
58 1 0.93% 95.37%
59 3 2.78% 98.15%
60 1 0.93% 99.07%
61 1 0.93% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 108 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L-8
Location: 300 e/o 37th St W
Between: 40th Street West to 35th Street West Ref. # 118 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:03 To 10;35
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 49
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.56
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 56
33 0 0.00% 0.00% 97th Percentile: 64
34 0 0.00% 0.00% 10 Mile Pace: 42 to 51
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 69.57%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 2 1.74% 1.74%
40 0 0.00% 1.74%
41 4 3.48% 5.22%
42 5 4.35% 9.57%
43 4 3.48% 13.04%
44 3 2.61% 15.65%
45 6 5.22% 20.87%
46 4 3.48% 24.35%
47 18 15.65% 40.00%
48 11 9.57% 49.57%
49 11 9.57% 59.13%
50 11 9.57% 68.70%
51 7 6.09% 74.78%
52 3 2.61% 77.39%
53 5 4.35% 81.74%
54 1 0.87% 82.61%
55 2 1.74% 84.35%
56 3 2.61% 86.96%
57 3 2.61% 89.57%
58 4 3.48% 93.04%
59 3 2.61% 95.65%
60 0 0.00% 95.65%
61 0 0.00% 95.65%
62 1 0.87% 96.52%
63 0 0.00% 96.52%
64 2 1.74% 98.26%
65 0 0.00% 98.26%
66 0 0.00% 98.26%
67 1 0.87% 99.13%
68 0 0.00% 99.13%
69 0 0.00% 99.13%
70 1 0.87% 100.00%
Total: 115 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L-8
Location: at 32nd St W
Between: 35th Street West to 30th Street West Ref. # 119 Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:25 To 10:00
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.51
31 0 0.00% 0.00% 50th Percentile: 46
32 0 0.00% 0.00% 85th Percentile: 50
33 0 0.00% 0.00% 97th Percentile: 56
34 0 0.00% 0.00% 10 Mile Pace: 42 to 51
35 2 2.04% 2.04% % of Samples in 10-Mile Pace: 69.39%
36 1 1.02% 3.06% Comments:
37 3 3.06% 6.12%
38 3 3.06% 9.18%
39 6 6.12% 15.31%
40 4 4.08% 19.39%
41 2 2.04% 21.43%
42 5 5.10% 26.53%
43 5 5.10% 31.63%
44 8 8.16% 39.80%
45 9 9.18% 48.98%
46 12 12.24% 61.22%
47 6 6.12% 67.35%
48 8 8.16% 75.51%
49 4 4.08% 79.59%
50 6 6.12% 85.71%
51 5 5.10% 90.82%
52 2 2.04% 92.86%
53 1 1.02% 93.88%
54 0 0.00% 93.88%
55 3 3.06% 96.94%
56 1 1.02% 97.96%
57 0 0.00% 97.96%
58 2 2.04% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 98 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L-8
Location: 400 feet east of 28th Street West
Between: 30th Street West to 26th Street West Ref. # 120 Cumulative Date: 12/15/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:10 To 4:10
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 35
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 4 16.67% 16.67% DATA ANALYSIS:
28 1 4.17% 20.83% Mean Speed: 33
29 3 12.50% 33.33% Standard Deviation: 5
30 2 8.33% 41.67% Standard error of the mean: 1.02
31 1 4.17% 45.83% 50th Percentile: 32
32 2 8.33% 54.17% 85th Percentile: 40
33 2 8.33% 62.50% 97th Percentile: 44
34 0 0.00% 62.50% 10 Mile Pace: 26 to 35
35 2 8.33% 70.83% % of Samples in 10-Mile Pace: 70.83%
36 0 0.00% 70.83% Comments:
37 2 8.33% 79.17%
38 0 0.00% 79.17%
39 1 4.17% 83.33%
40 1 4.17% 87.50%
41 0 0.00% 87.50%
42 0 0.00% 87.50%
43 2 8.33% 95.83%
44 1 4.17% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 24 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 0.5
1 1.5
2 2.5
3 3.5
4 4.5Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue L-8
Location: 500 e/o10th St West
Between: 10th Street West to 6th Street West Ref. # 121 Cumulative Date: 10/27 & 11/17/21 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:45 /3:30 To 3:10 /4:00
21 0 0.00% 0.00% Recorder: EY/AY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 1 1.03% 1.03%
26 1 1.03% 2.06%
27 6 6.19% 8.25% DATA ANALYSIS:
28 1 1.03% 9.28% Mean Speed: 37
29 6 6.19% 15.46% Standard Deviation: 6
30 0 0.00% 15.46% Standard error of the mean: 0.61
31 2 2.06% 17.53% 50th Percentile: 36
32 5 5.15% 22.68% 85th Percentile: 42
33 9 9.28% 31.96% 97th Percentile: 50
34 2 2.06% 34.02% 10 Mile Pace: 32 to 41
35 9 9.28% 43.30% % of Samples in 10-Mile Pace: 67.01%
36 7 7.22% 50.52% Comments:
37 3 3.09% 53.61%
38 10 10.31% 63.92%
39 7 7.22% 71.13%
40 5 5.15% 76.29%
41 8 8.25% 84.54%
42 5 5.15% 89.69%
43 3 3.09% 92.78%
44 0 0.00% 92.78%
45 1 1.03% 93.81%
46 0 0.00% 93.81%
47 1 1.03% 94.85%
48 1 1.03% 95.88%
49 1 1.03% 96.91%
50 1 1.03% 97.94%
51 0 0.00% 97.94%
52 0 0.00% 97.94%
53 0 0.00% 97.94%
54 2 2.06% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 97 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue M
Location: at 1611 Ave M
Between: 20th Street West to 15th Street West Ref. # 125 Cumulative Date: 10/28/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:53 To 4:25
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 55
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.37
31 0 0.00% 0.00% 50th Percentile: 54
32 0 0.00% 0.00% 85th Percentile: 58
33 0 0.00% 0.00% 97th Percentile: 63
34 0 0.00% 0.00% 10 Mile Pace: 50 to 59
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 82.61%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 0 0.00% 0.00%
43 1 0.87% 0.87%
44 0 0.00% 0.87%
45 2 1.74% 2.61%
46 2 1.74% 4.35%
47 1 0.87% 5.22%
48 2 1.74% 6.96%
49 2 1.74% 8.70%
50 5 4.35% 13.04%
51 3 2.61% 15.65%
52 8 6.96% 22.61%
53 16 13.91% 36.52%
54 18 15.65% 52.17%
55 19 16.52% 68.70%
56 10 8.70% 77.39%
57 5 4.35% 81.74%
58 6 5.22% 86.96%
59 5 4.35% 91.30%
60 1 0.87% 92.17%
61 3 2.61% 94.78%
62 1 0.87% 95.65%
63 2 1.74% 97.39%
64 0 0.00% 97.39%
65 1 0.87% 98.26%
66 0 0.00% 98.26%
67 0 0.00% 98.26%
68 1 0.87% 99.13%
69 0 0.00% 99.13%
70 1 0.87% 100.00%
Total: 115 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue M
Location: 1000' w/o SR 14
Between: 15th Street West to 10th Street West Ref. # 126 Cumulative Date: 11/10/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:30 To 12:00
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 54
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.31
31 0 0.00% 0.00% 50th Percentile: 54
32 0 0.00% 0.00% 85th Percentile: 58
33 0 0.00% 0.00% 97th Percentile: 62
34 0 0.00% 0.00% 10 Mile Pace: 50 to 59
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 76.07%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 2 1.23% 1.23%
39 0 0.00% 1.23%
40 0 0.00% 1.23%
41 0 0.00% 1.23%
42 1 0.61% 1.84%
43 0 0.00% 1.84%
44 0 0.00% 1.84%
45 2 1.23% 3.07%
46 3 1.84% 4.91%
47 6 3.68% 8.59%
48 5 3.07% 11.66%
49 7 4.29% 15.95%
50 6 3.68% 19.63%
51 8 4.91% 24.54%
52 18 11.04% 35.58%
53 12 7.36% 42.94%
54 23 14.11% 57.06%
55 14 8.59% 65.64%
56 20 12.27% 77.91%
57 8 4.91% 82.82%
58 7 4.29% 87.12%
59 8 4.91% 92.02%
60 2 1.23% 93.25%
61 6 3.68% 96.93%
62 1 0.61% 97.55%
63 3 1.84% 99.39%
64 0 0.00% 99.39%
65 0 0.00% 99.39%
66 1 0.61% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 163 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue M-8
Location: At 42nd Street West
Between: 40th Street West to 45th Street West Ref. # 129 Cumulative Date: 10/28 &12/15/21 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:50/8:20 To 2:50/9:30
21 0 0.00% 0.00% Recorder: EY/AY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 42
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.59
31 0 0.00% 0.00% 50th Percentile: 42
32 1 1.37% 1.37% 85th Percentile: 48
33 2 2.74% 4.11% 97th Percentile: 51
34 1 1.37% 5.48% 10 Mile Pace: 36 to 45
35 2 2.74% 8.22% % of Samples in 10-Mile Pace: 72.60%
36 2 2.74% 10.96% Comments:
37 2 2.74% 13.70%
38 3 4.11% 17.81%
39 5 6.85% 24.66%
40 6 8.22% 32.88%
41 9 12.33% 45.21%
42 10 13.70% 58.90%
43 5 6.85% 65.75%
44 5 6.85% 72.60%
45 6 8.22% 80.82%
46 2 2.74% 83.56%
47 1 1.37% 84.93%
48 2 2.74% 87.67%
49 3 4.11% 91.78%
50 2 2.74% 94.52%
51 2 2.74% 97.26%
52 2 2.74% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 73 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Avenue M-8
Location: At 38th Street West
Between: 35th Street West to 40th Street West Ref. # 130 Cumulative Date: 1/5 & 1/18/22 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:45/7:40 To 11:45/8:20
21 0 0.00% 0.00% Recorder: EY/AY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 42
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.58
31 0 0.00% 0.00% 50th Percentile: 41
32 0 0.00% 0.00% 85th Percentile: 47
33 2 2.70% 2.70% 97th Percentile: 53
34 3 4.05% 6.76% 10 Mile Pace: 36 to 45
35 4 5.41% 12.16% % of Samples in 10-Mile Pace: 63.51%
36 3 4.05% 16.22% Comments:
37 4 5.41% 21.62%
38 7 9.46% 31.08%
39 2 2.70% 33.78%
40 5 6.76% 40.54%
41 7 9.46% 50.00%
42 5 6.76% 56.76%
43 4 5.41% 62.16%
44 4 5.41% 67.57%
45 6 8.11% 75.68%
46 3 4.05% 79.73%
47 4 5.41% 85.14%
48 1 1.35% 86.49%
49 1 1.35% 87.84%
50 3 4.05% 91.89%
51 0 0.00% 91.89%
52 3 4.05% 95.95%
53 1 1.35% 97.30%
54 0 0.00% 97.30%
55 2 2.70% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 74 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 65th Street West
Location: 500 feet south of Avenue J
Between: Avenue J to Avenue J-8 Ref. # 132
Cumulative Date: 1/5 & 1/18/22 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:10/9:15 To 4:10/10:00
21 0 0.00% 0.00% Recorder: EY/AY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.61
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 49
33 0 0.00% 0.00% 97th Percentile: 53
34 0 0.00% 0.00% 10 Mile Pace: 39 to 48
35 1 1.47% 1.47% % of Samples in 10-Mile Pace: 67.65%
36 1 1.47% 2.94% Comments:
37 2 2.94% 5.88%
38 3 4.41% 10.29%
39 8 11.76% 22.06%
40 3 4.41% 26.47%
41 2 2.94% 29.41%
42 6 8.82% 38.24%
43 4 5.88% 44.12%
44 3 4.41% 48.53%
45 6 8.82% 57.35%
46 4 5.88% 63.24%
47 5 7.35% 70.59%
48 5 7.35% 77.94%
49 7 10.29% 88.24%
50 1 1.47% 89.71%
51 1 1.47% 91.18%
52 3 4.41% 95.59%
53 1 1.47% 97.06%
54 1 1.47% 98.53%
55 0 0.00% 98.53%
56 0 0.00% 98.53%
57 0 0.00% 98.53%
58 1 1.47% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 68 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8 9Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 65th Street West
Location: 500 feet south of Avenue J-8
Between: Avenue J-8 to Avenue J-12 Ref. # 133
Cumulative Date: 1/5/2022 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:00/4:15 To 2:40/4:45
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 39
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 1.9
31 1 10.00% 10.00% 50th Percentile: 38
32 0 0.00% 10.00% 85th Percentile: 43
33 1 10.00% 20.00% 97th Percentile: 51
34 1 10.00% 30.00% 10 Mile Pace: 30 to 39
35 0 0.00% 30.00% % of Samples in 10-Mile Pace: 70.00%
36 0 0.00% 30.00% Comments:
37 0 0.00% 30.00%
38 3 30.00% 60.00%
39 1 10.00% 70.00%
40 0 0.00% 70.00%
41 0 0.00% 70.00%
42 1 10.00% 80.00%
43 1 10.00% 90.00%
44 0 0.00% 90.00%
45 0 0.00% 90.00%
46 0 0.00% 90.00%
47 0 0.00% 90.00%
48 0 0.00% 90.00%
49 0 0.00% 90.00%
50 0 0.00% 90.00%
51 1 10.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 10 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 0.5
1 1.5
2 2.5
3 3.5Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 65th Street West
Location: At Avenue L-4
Between: Avenue L to Avenue L-8 Ref. # 134
Cumulative Date: 1/5/2022 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:55 To 1:55
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 42
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.61
31 1 1.49% 1.49% 50th Percentile: 41
32 1 1.49% 2.99% 85th Percentile: 46
33 1 1.49% 4.48% 97th Percentile: 53
34 3 4.48% 8.96% 10 Mile Pace: 37 to 46
35 2 2.99% 11.94% % of Samples in 10-Mile Pace: 71.64%
36 1 1.49% 13.43% Comments:
37 3 4.48% 17.91%
38 5 7.46% 25.37%
39 10 14.93% 40.30%
40 5 7.46% 47.76%
41 2 2.99% 50.75%
42 6 8.96% 59.70%
43 7 10.45% 70.15%
44 3 4.48% 74.63%
45 5 7.46% 82.09%
46 2 2.99% 85.07%
47 0 0.00% 85.07%
48 3 4.48% 89.55%
49 3 4.48% 94.03%
50 0 0.00% 94.03%
51 0 0.00% 94.03%
52 1 1.49% 95.52%
53 1 1.49% 97.01%
54 1 1.49% 98.51%
55 0 0.00% 98.51%
56 1 1.49% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 67 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 60th Street West
Location: 1000' s/o State Prison
Between: Avenue I to Avenue J Ref. # 135
Cumulative Date: 10/28/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:45 To 12:20
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 55
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.52
31 0 0.00% 0.00% 50th Percentile: 54
32 0 0.00% 0.00% 85th Percentile: 60
33 0 0.00% 0.00% 97th Percentile: 64
34 0 0.00% 0.00% 10 Mile Pace: 52 to 61
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 73.91%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 0 0.00% 0.00%
43 0 0.00% 0.00%
44 0 0.00% 0.00%
45 0 0.00% 0.00%
46 3 3.26% 3.26%
47 3 3.26% 6.52%
48 2 2.17% 8.70%
49 4 4.35% 13.04%
50 5 5.43% 18.48%
51 2 2.17% 20.65%
52 7 7.61% 28.26%
53 9 9.78% 38.04%
54 13 14.13% 52.17%
55 3 3.26% 55.43%
56 9 9.78% 65.22%
57 4 4.35% 69.57%
58 7 7.61% 77.17%
59 7 7.61% 84.78%
60 5 5.43% 90.22%
61 4 4.35% 94.57%
62 1 1.09% 95.65%
63 1 1.09% 96.74%
64 1 1.09% 97.83%
65 0 0.00% 97.83%
66 0 0.00% 97.83%
67 0 0.00% 97.83%
68 0 0.00% 97.83%
69 2 2.17% 100.00%
70 0 0.00% 100.00%
Total: 92 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 45th Street West
Location: at Ave J-4
Between: Avenue J to Avenue J-8 Ref. # 143
Cumulative Date: 10/28/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:25 To 1:05
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.41
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 49
33 0 0.00% 0.00% 97th Percentile: 53
34 0 0.00% 0.00% 10 Mile Pace: 40 to 49
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 80.85%
36 1 1.06% 1.06% Comments:
37 1 1.06% 2.13%
38 2 2.13% 4.26%
39 2 2.13% 6.38%
40 6 6.38% 12.77%
41 4 4.26% 17.02%
42 9 9.57% 26.60%
43 8 8.51% 35.11%
44 12 12.77% 47.87%
45 8 8.51% 56.38%
46 9 9.57% 65.96%
47 6 6.38% 72.34%
48 7 7.45% 79.79%
49 7 7.45% 87.23%
50 3 3.19% 90.43%
51 1 1.06% 91.49%
52 4 4.26% 95.74%
53 3 3.19% 98.94%
54 1 1.06% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 94 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 45th Street West
Location: at Ave J-10
Between: Avenue J-8 to Avenue K Ref. # 144
Cumulative Date: 10/28/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:08 To 1:40
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.47
31 0 0.00% 0.00% 50th Percentile: 43
32 1 0.88% 0.88% 85th Percentile: 48
33 1 0.88% 1.77% 97th Percentile: 55
34 0 0.00% 1.77% 10 Mile Pace: 38 to 47
35 3 2.65% 4.42% % of Samples in 10-Mile Pace: 71.68%
36 3 2.65% 7.08% Comments:
37 4 3.54% 10.62%
38 6 5.31% 15.93%
39 5 4.42% 20.35%
40 9 7.96% 28.32%
41 2 1.77% 30.09%
42 10 8.85% 38.94%
43 14 12.39% 51.33%
44 8 7.08% 58.41%
45 11 9.73% 68.14%
46 11 9.73% 77.88%
47 5 4.42% 82.30%
48 4 3.54% 85.84%
49 5 4.42% 90.27%
50 0 0.00% 90.27%
51 1 0.88% 91.15%
52 3 2.65% 93.81%
53 1 0.88% 94.69%
54 2 1.77% 96.46%
55 1 0.88% 97.35%
56 2 1.77% 99.12%
57 0 0.00% 99.12%
58 0 0.00% 99.12%
59 0 0.00% 99.12%
60 0 0.00% 99.12%
61 1 0.88% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 113 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 40th Street West
Location: North of Derby
Between: Avenue M-8 to Avenue N Ref. # 147
Cumulative Date: 1/5 & 1/18/22 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:47 /8:25 To 12:47/9:00
21 0 0.00% 0.00% Recorder: EY/AY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 43
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.48
31 0 0.00% 0.00% 50th Percentile: 42
32 1 1.43% 1.43% 85th Percentile: 47
33 0 0.00% 1.43% 97th Percentile: 52
34 0 0.00% 1.43% 10 Mile Pace: 38 to 47
35 0 0.00% 1.43% % of Samples in 10-Mile Pace: 84.29%
36 0 0.00% 1.43% Comments:
37 3 4.29% 5.71%
38 2 2.86% 8.57%
39 3 4.29% 12.86%
40 10 14.29% 27.14%
41 12 17.14% 44.29%
42 10 14.29% 58.57%
43 7 10.00% 68.57%
44 5 7.14% 75.71%
45 6 8.57% 84.29%
46 0 0.00% 84.29%
47 4 5.71% 90.00%
48 1 1.43% 91.43%
49 0 0.00% 91.43%
50 1 1.43% 92.86%
51 2 2.86% 95.71%
52 1 1.43% 97.14%
53 0 0.00% 97.14%
54 1 1.43% 98.57%
55 1 1.43% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 70 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street West
Location: At Kildare
Between: Lancaster Blvd to North End Ref. # 149
Cumulative Date: 1/5/2022 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 4:45 To 5:50
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 35
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 2 13.33% 13.33%
27 1 6.67% 20.00% DATA ANALYSIS:
28 0 0.00% 20.00% Mean Speed: 31
29 1 6.67% 26.67% Standard Deviation: 3
30 0 0.00% 26.67% Standard error of the mean: 0.77
31 4 26.67% 53.33% 50th Percentile: 31
32 2 13.33% 66.67% 85th Percentile: 35
33 1 6.67% 73.33% 97th Percentile: 36
34 1 6.67% 80.00% 10 Mile Pace: 26 to 35
35 2 13.33% 93.33% % of Samples in 10-Mile Pace: 93.33% 36 1 6.67% 100.00% Comments:
37 0 0.00% 100.00%
38 0 0.00% 100.00%
39 0 0.00% 100.00%
40 0 0.00% 100.00%
41 0 0.00% 100.00%
42 0 0.00% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 15 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 0.5
1 1.5
2 2.5
3 3.5
4 4.5Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street West
Location: 1200' S/o Lancaster Blvd
Between: Lancaster Blvd to Avenue J Ref. # 150
Cumulative Date: 11/10/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:10 To 2:00
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 5
30 1 0.92% 0.92% Standard error of the mean: 0.48
31 0 0.00% 0.92% 50th Percentile: 40
32 0 0.00% 0.92% 85th Percentile: 44
33 0 0.00% 0.92% 97th Percentile: 53
34 2 1.83% 2.75% 10 Mile Pace: 35 to 44
35 4 3.67% 6.42% % of Samples in 10-Mile Pace: 82.57%
36 5 4.59% 11.01% Comments:
37 9 8.26% 19.27%
38 11 10.09% 29.36%
39 13 11.93% 41.28%
40 11 10.09% 51.38%
41 9 8.26% 59.63%
42 9 8.26% 67.89%
43 13 11.93% 79.82%
44 6 5.50% 85.32%
45 4 3.67% 88.99%
46 5 4.59% 93.58%
47 0 0.00% 93.58%
48 1 0.92% 94.50%
49 2 1.83% 96.33%
50 0 0.00% 96.33%
51 0 0.00% 96.33%
52 0 0.00% 96.33%
53 1 0.92% 97.25%
54 0 0.00% 97.25%
55 0 0.00% 97.25%
56 1 0.92% 98.17%
57 0 0.00% 98.17%
58 0 0.00% 98.17%
59 0 0.00% 98.17%
60 0 0.00% 98.17%
61 2 1.83% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 109 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street West
Location: at Ave J-4
Between: Avenue J to Avenue J-12 Ref. # 151
Cumulative Date: 11/10/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:10 To 2:00
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.47
31 0 0.00% 0.00% 50th Percentile: 40
32 0 0.00% 0.00% 85th Percentile: 47
33 2 1.74% 1.74% 97th Percentile: 50
34 4 3.48% 5.22% 10 Mile Pace: 35 to 44
35 4 3.48% 8.70% % of Samples in 10-Mile Pace: 69.57%
36 9 7.83% 16.52% Comments:
37 8 6.96% 23.48%
38 7 6.09% 29.57%
39 12 10.43% 40.00%
40 12 10.43% 50.43%
41 6 5.22% 55.65%
42 9 7.83% 63.48%
43 8 6.96% 70.43%
44 5 4.35% 74.78%
45 4 3.48% 78.26%
46 7 6.09% 84.35%
47 2 1.74% 86.09%
48 7 6.09% 92.17%
49 5 4.35% 96.52%
50 1 0.87% 97.39%
51 1 0.87% 98.26%
52 1 0.87% 99.13%
53 1 0.87% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 115 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street West
Location: at Ave K-10
Between: Avenue K-8 to Avenue L Ref. # 153
Cumulative Date: 10/28/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:15 To 3:45
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.4
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 50
33 1 0.99% 0.99% 97th Percentile: 54
34 0 0.00% 0.99% 10 Mile Pace: 42 to 51
35 0 0.00% 0.99% % of Samples in 10-Mile Pace: 73.27%
36 1 0.99% 1.98% Comments:
37 1 0.99% 2.97%
38 3 2.97% 5.94%
39 4 3.96% 9.90%
40 3 2.97% 12.87%
41 4 3.96% 16.83%
42 9 8.91% 25.74%
43 8 7.92% 33.66%
44 9 8.91% 42.57%
45 10 9.90% 52.48%
46 9 8.91% 61.39%
47 7 6.93% 68.32%
48 8 7.92% 76.24%
49 5 4.95% 81.19%
50 4 3.96% 85.15%
51 5 4.95% 90.10%
52 4 3.96% 94.06%
53 1 0.99% 95.05%
54 2 1.98% 97.03%
55 3 2.97% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 101 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street West
Location: at Ave L-4
Between: Avenue L to Avenue L-8 Ref. # 154
Cumulative Date: 10/28/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:35 To 3:10
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.5
31 1 0.98% 0.98% 50th Percentile: 40
32 1 0.98% 1.96% 85th Percentile: 48
33 2 1.96% 3.92% 97th Percentile: 52
34 3 2.94% 6.86% 10 Mile Pace: 36 to 45
35 4 3.92% 10.78% % of Samples in 10-Mile Pace: 68.63%
36 5 4.90% 15.69% Comments:
37 6 5.88% 21.57%
38 10 9.80% 31.37%
39 13 12.75% 44.12%
40 9 8.82% 52.94%
41 3 2.94% 55.88%
42 7 6.86% 62.75%
43 4 3.92% 66.67%
44 7 6.86% 73.53%
45 6 5.88% 79.41%
46 2 1.96% 81.37%
47 3 2.94% 84.31%
48 3 2.94% 87.25%
49 5 4.90% 92.16%
50 1 0.98% 93.14%
51 3 2.94% 96.08%
52 3 2.94% 99.02%
53 1 0.98% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 102 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street West
Location: at Ave L-12
Between: Avenue L-8 to Avenue M Ref. # 155
Cumulative Date: 10/28/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:50 To 2:30
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.56
31 1 0.88% 0.88% 50th Percentile: 44
32 1 0.88% 1.77% 85th Percentile: 51
33 0 0.00% 1.77% 97th Percentile: 55
34 0 0.00% 1.77% 10 Mile Pace: 37 to 46
35 0 0.00% 1.77% % of Samples in 10-Mile Pace: 61.06%
36 4 3.54% 5.31% Comments:
37 7 6.19% 11.50%
38 5 4.42% 15.93%
39 7 6.19% 22.12%
40 7 6.19% 28.32%
41 7 6.19% 34.51%
42 8 7.08% 41.59%
43 7 6.19% 47.79%
44 6 5.31% 53.10%
45 8 7.08% 60.18%
46 7 6.19% 66.37%
47 5 4.42% 70.80%
48 5 4.42% 75.22%
49 4 3.54% 78.76%
50 6 5.31% 84.07%
51 6 5.31% 89.38%
52 3 2.65% 92.04%
53 4 3.54% 95.58%
54 1 0.88% 96.46%
55 2 1.77% 98.23%
56 2 1.77% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 113 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8 9Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 30th Street West
Location: at Midpoint
Between: Avenue G to Avenue G-8 Ref. # 156
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:05 To 11:05
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 54
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.57
31 0 0.00% 0.00% 50th Percentile: 54
32 0 0.00% 0.00% 85th Percentile: 59
33 0 0.00% 0.00% 97th Percentile: 63
34 0 0.00% 0.00% 10 Mile Pace: 50 to 59
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 71.43%
36 1 1.30% 1.30% Comments:
37 0 0.00% 1.30%
38 0 0.00% 1.30%
39 1 1.30% 2.60%
40 0 0.00% 2.60%
41 1 1.30% 3.90%
42 0 0.00% 3.90%
43 1 1.30% 5.19%
44 1 1.30% 6.49%
45 0 0.00% 6.49%
46 1 1.30% 7.79%
47 2 2.60% 10.39%
48 2 2.60% 12.99%
49 4 5.19% 18.18%
50 2 2.60% 20.78%
51 4 5.19% 25.97%
52 6 7.79% 33.77%
53 6 7.79% 41.56%
54 8 10.39% 51.95%
55 10 12.99% 64.94%
56 6 7.79% 72.73%
57 4 5.19% 77.92%
58 4 5.19% 83.12%
59 5 6.49% 89.61%
60 2 2.60% 92.21%
61 1 1.30% 93.51%
62 1 1.30% 94.81%
63 2 2.60% 97.40%
64 1 1.30% 98.70%
65 1 1.30% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 77 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 30th Street West
Location: 1000 feet n/o Avenue H
Between: Avenue G-8 to Avenue H Ref. # 157
Cumulative Date: 1/18/2022 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:10/1:10 To 10:40/1:45
21 0 0.00% 0.00% Recorder: AY
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 52
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.55
31 0 0.00% 0.00% 50th Percentile: 52
32 0 0.00% 0.00% 85th Percentile: 58
33 0 0.00% 0.00% 97th Percentile: 60
34 0 0.00% 0.00% 10 Mile Pace: 51 to 60
35 1 1.22% 1.22% % of Samples in 10-Mile Pace: 65.85%
36 0 0.00% 1.22% Comments:
37 0 0.00% 1.22%
38 1 1.22% 2.44%
39 0 0.00% 2.44%
40 0 0.00% 2.44%
41 2 2.44% 4.88%
42 1 1.22% 6.10%
43 1 1.22% 7.32%
44 1 1.22% 8.54%
45 1 1.22% 9.76%
46 5 6.10% 15.85%
47 8 9.76% 25.61%
48 0 0.00% 25.61%
49 4 4.88% 30.49%
50 3 3.66% 34.15%
51 3 3.66% 37.80%
52 14 17.07% 54.88%
53 4 4.88% 59.76%
54 6 7.32% 67.07%
55 4 4.88% 71.95%
56 6 7.32% 79.27%
57 2 2.44% 81.71%
58 5 6.10% 87.80%
59 6 7.32% 95.12%
60 4 4.88% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 82 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 27th Street West
Location: at Double Play Way
Between: Avenue I to Lancaster Blvd Ref. # 166
Cumulative Date: 11/10/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:20 To 4:40
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 5
30 1 1.41% 1.41% Standard error of the mean: 0.59
31 0 0.00% 1.41% 50th Percentile: 45
32 1 1.41% 2.82% 85th Percentile: 51
33 0 0.00% 2.82% 97th Percentile: 54
34 0 0.00% 2.82% 10 Mile Pace: 39 to 48
35 0 0.00% 2.82% % of Samples in 10-Mile Pace: 73.24%
36 0 0.00% 2.82% Comments:
37 0 0.00% 2.82%
38 2 2.82% 5.63%
39 4 5.63% 11.27%
40 4 5.63% 16.90%
41 2 2.82% 19.72%
42 10 14.08% 33.80%
43 6 8.45% 42.25%
44 5 7.04% 49.30%
45 6 8.45% 57.75%
46 6 8.45% 66.20%
47 2 2.82% 69.01%
48 7 9.86% 78.87%
49 1 1.41% 80.28%
50 2 2.82% 83.10%
51 5 7.04% 90.14%
52 3 4.23% 94.37%
53 1 1.41% 95.77%
54 1 1.41% 97.18%
55 0 0.00% 97.18%
56 1 1.41% 98.59%
57 0 0.00% 98.59%
58 0 0.00% 98.59%
59 1 1.41% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 71 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 23rd Street West
Location: 1500 s/o Ave H-2
Between: Avenue H-2 to Avenue I Ref. # 174
Cumulative Date: 11/10/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:10 To 3:15
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.6
31 0 0.00% 0.00% 50th Percentile: 43
32 3 2.97% 2.97% 85th Percentile: 50
33 0 0.00% 2.97% 97th Percentile: 56
34 1 0.99% 3.96% 10 Mile Pace: 36 to 45
35 2 1.98% 5.94% % of Samples in 10-Mile Pace: 59.41%
36 5 4.95% 10.89% Comments:
37 6 5.94% 16.83%
38 7 6.93% 23.76%
39 6 5.94% 29.70%
40 5 4.95% 34.65%
41 3 2.97% 37.62%
42 7 6.93% 44.55%
43 8 7.92% 52.48%
44 8 7.92% 60.40%
45 5 4.95% 65.35%
46 3 2.97% 68.32%
47 7 6.93% 75.25%
48 4 3.96% 79.21%
49 5 4.95% 84.16%
50 2 1.98% 86.14%
51 2 1.98% 88.12%
52 5 4.95% 93.07%
53 1 0.99% 94.06%
54 0 0.00% 94.06%
55 1 0.99% 95.05%
56 2 1.98% 97.03%
57 1 0.99% 98.02%
58 1 0.99% 99.01%
59 0 0.00% 99.01%
60 1 0.99% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 101 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8 9Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 20th Street West
Location: at Ave L-8
Between: Avenue L to Avenue M Ref. # 181
Cumulative Date: 10/22/2021 Day: Friday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 8:45 To 9:15
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 51
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.46
31 0 0.00% 0.00% 50th Percentile: 50
32 0 0.00% 0.00% 85th Percentile: 57
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 45 to 54
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 66.67%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 3 2.56% 2.56%
43 6 5.13% 7.69%
44 4 3.42% 11.11%
45 5 4.27% 15.38%
46 8 6.84% 22.22%
47 10 8.55% 30.77%
48 9 7.69% 38.46%
49 9 7.69% 46.15%
50 8 6.84% 52.99%
51 7 5.98% 58.97%
52 9 7.69% 66.67%
53 6 5.13% 71.79%
54 7 5.98% 77.78%
55 3 2.56% 80.34%
56 5 4.27% 84.62%
57 6 5.13% 89.74%
58 5 4.27% 94.02%
59 5 4.27% 98.29%
60 2 1.71% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 117 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 17th Street West
Location: at Holiday Inn Express
Between: Avenue J-12 to Avenue K Ref. # 182
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:37 To 2:10
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 35
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 1 0.93% 0.93% Mean Speed: 36
29 0 0.00% 0.93% Standard Deviation: 3
30 3 2.78% 3.70% Standard error of the mean: 0.29
31 6 5.56% 9.26% 50th Percentile: 36
32 4 3.70% 12.96% 85th Percentile: 39
33 11 10.19% 23.15% 97th Percentile: 43
34 15 13.89% 37.04% 10 Mile Pace: 31 to 40
35 12 11.11% 48.15% % of Samples in 10-Mile Pace: 87.04% 36 13 12.04% 60.19% Comments:
37 9 8.33% 68.52%
38 13 12.04% 80.56%
39 7 6.48% 87.04%
40 4 3.70% 90.74%
41 2 1.85% 92.59%
42 2 1.85% 94.44%
43 3 2.78% 97.22%
44 2 1.85% 99.07%
45 0 0.00% 99.07%
46 1 0.93% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 108 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 17th Street West
Location: at Sunset Ridge
Between: Avenue K to Avenue K-8 Ref. # 183
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:13 To 3:05
21 0 0.00% 0.00% Recorder: EY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 1 0.92% 0.92% Mean Speed: 38
29 0 0.00% 0.92% Standard Deviation: 4
30 2 1.83% 2.75% Standard error of the mean: 0.38
31 0 0.00% 2.75% 50th Percentile: 38
32 4 3.67% 6.42% 85th Percentile: 42
33 6 5.50% 11.93% 97th Percentile: 46
34 9 8.26% 20.18% 10 Mile Pace: 32 to 41
35 2 1.83% 22.02% % of Samples in 10-Mile Pace: 80.73%
36 16 14.68% 36.70% Comments:
37 10 9.17% 45.87%
38 11 10.09% 55.96%
39 11 10.09% 66.06%
40 10 9.17% 75.23%
41 9 8.26% 83.49%
42 3 2.75% 86.24%
43 3 2.75% 88.99%
44 4 3.67% 92.66%
45 2 1.83% 94.50%
46 5 4.59% 99.08%
47 1 0.92% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 109 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 13th Street West
Location: 300' s/o Ave K
Between: Avenue K to 12th Street West Ref. # 192
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 1 0.89% 0.89% Hours: 3:10 To 3:45
21 0 0.00% 0.89% Recorder: EY
22 0 0.00% 0.89% Posted Speed: 30
23 1 0.89% 1.79% Remarks:
24 2 1.79% 3.57%
25 6 5.36% 8.93%
26 4 3.57% 12.50%
27 3 2.68% 15.18% DATA ANALYSIS:
28 10 8.93% 24.11% Mean Speed: 31
29 15 13.39% 37.50% Standard Deviation: 4
30 16 14.29% 51.79% Standard error of the mean: 0.38
31 9 8.04% 59.82% 50th Percentile: 30
32 10 8.93% 68.75% 85th Percentile: 35
33 9 8.04% 76.79% 97th Percentile: 40
34 8 7.14% 83.93% 10 Mile Pace: 25 to 34
35 4 3.57% 87.50% % of Samples in 10-Mile Pace: 80.36%
36 4 3.57% 91.07% Comments:
37 2 1.79% 92.86%
38 2 1.79% 94.64%
39 1 0.89% 95.54%
40 2 1.79% 97.32%
41 0 0.00% 97.32%
42 3 2.68% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 112 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 12th Street West
Location: 450' s/o Ave K
Between: Avenue K to Commerce Center Ref. # 193
Cumulative Date: 11/10/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:48 To 11:20
21 0 0.00% 0.00% Recorder: EY
22 1 0.72% 0.72% Posted Speed: 30
23 0 0.00% 0.72% Remarks:
24 3 2.17% 2.90%
25 4 2.90% 5.80%
26 10 7.25% 13.04%
27 9 6.52% 19.57% DATA ANALYSIS:
28 13 9.42% 28.99% Mean Speed: 30
29 16 11.59% 40.58% Standard Deviation: 3
30 23 16.67% 57.25% Standard error of the mean: 0.26
31 16 11.59% 68.84% 50th Percentile: 30
32 14 10.14% 78.99% 85th Percentile: 33
33 12 8.70% 87.68% 97th Percentile: 35
34 8 5.80% 93.48% 10 Mile Pace: 26 to 35
35 5 3.62% 97.10% % of Samples in 10-Mile Pace: 91.30%
36 4 2.90% 100.00% Comments:
37 0 0.00% 100.00%
38 0 0.00% 100.00%
39 0 0.00% 100.00%
40 0 0.00% 100.00%
41 0 0.00% 100.00%
42 0 0.00% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 138 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at Ave H-4
Between: Avenue H to Avenue H-8 Ref. # 194
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:08 To 10:39
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 48
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.57
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 54
33 0 0.00% 0.00% 97th Percentile: 60
34 1 0.92% 0.92% 10 Mile Pace: 43 to 52
35 0 0.00% 0.92% % of Samples in 10-Mile Pace: 59.63%
36 5 4.59% 5.50% Comments:
37 2 1.83% 7.34%
38 0 0.00% 7.34%
39 3 2.75% 10.09%
40 2 1.83% 11.93%
41 5 4.59% 16.51%
42 6 5.50% 22.02%
43 3 2.75% 24.77%
44 2 1.83% 26.61%
45 5 4.59% 31.19%
46 5 4.59% 35.78%
47 6 5.50% 41.28%
48 5 4.59% 45.87%
49 11 10.09% 55.96%
50 12 11.01% 66.97%
51 5 4.59% 71.56%
52 11 10.09% 81.65%
53 3 2.75% 84.40%
54 2 1.83% 86.24%
55 2 1.83% 88.07%
56 4 3.67% 91.74%
57 1 0.92% 92.66%
58 1 0.92% 93.58%
59 2 1.83% 95.41%
60 3 2.75% 98.17%
61 2 1.83% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 109 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at Ave H-14
Between: Avenue H-8 to Avenue I Ref. # 195
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:43 To 11:09
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.42
31 0 0.00% 0.00% 50th Percentile: 43
32 0 0.00% 0.00% 85th Percentile: 49
33 0 0.00% 0.00% 97th Percentile: 55
34 0 0.00% 0.00% 10 Mile Pace: 37 to 46
35 6 4.32% 4.32% % of Samples in 10-Mile Pace: 65.47%
36 9 6.47% 10.79% Comments:
37 5 3.60% 14.39%
38 4 2.88% 17.27%
39 16 11.51% 28.78%
40 4 2.88% 31.65%
41 3 2.16% 33.81%
42 15 10.79% 44.60%
43 8 5.76% 50.36%
44 11 7.91% 58.27%
45 10 7.19% 65.47%
46 15 10.79% 76.26%
47 5 3.60% 79.86%
48 4 2.88% 82.73%
49 5 3.60% 86.33%
50 3 2.16% 88.49%
51 5 3.60% 92.09%
52 2 1.44% 93.53%
53 2 1.44% 94.96%
54 1 0.72% 95.68%
55 3 2.16% 97.84%
56 0 0.00% 97.84%
57 3 2.16% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 139 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at Jackman
Between: Avenue I to Lancaster Blvd Ref. # 196
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:30 To 12:00
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 40
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.34
31 0 0.00% 0.00% 50th Percentile: 40
32 0 0.00% 0.00% 85th Percentile: 45
33 0 0.00% 0.00% 97th Percentile: 48
34 0 0.00% 0.00% 10 Mile Pace: 35 to 44
35 9 6.47% 6.47% % of Samples in 10-Mile Pace: 80.58%
36 19 13.67% 20.14% Comments:
37 10 7.19% 27.34%
38 11 7.91% 35.25%
39 19 13.67% 48.92%
40 12 8.63% 57.55%
41 4 2.88% 60.43%
42 13 9.35% 69.78%
43 8 5.76% 75.54%
44 7 5.04% 80.58%
45 7 5.04% 85.61%
46 8 5.76% 91.37%
47 7 5.04% 96.40%
48 2 1.44% 97.84%
49 2 1.44% 99.28%
50 1 0.72% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 139 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at Newgrove
Between: Lancaster Blvd to Avenue J Ref. # 197
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:10 To 12:40
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.28
31 0 0.00% 0.00% 50th Percentile: 40
32 0 0.00% 0.00% 85th Percentile: 46
33 0 0.00% 0.00% 97th Percentile: 50
34 0 0.00% 0.00% 10 Mile Pace: 35 to 44
35 9 4.29% 4.29% % of Samples in 10-Mile Pace: 81.43%
36 10 4.76% 9.05% Comments:
37 16 7.62% 16.67%
38 16 7.62% 24.29%
39 32 15.24% 39.52%
40 26 12.38% 51.90%
41 19 9.05% 60.95%
42 24 11.43% 72.38%
43 9 4.29% 76.67%
44 10 4.76% 81.43%
45 3 1.43% 82.86%
46 14 6.67% 89.52%
47 3 1.43% 90.95%
48 4 1.90% 92.86%
49 4 1.90% 94.76%
50 5 2.38% 97.14%
51 1 0.48% 97.62%
52 5 2.38% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 210 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30 35Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at Ave J-4
Between: Avenue J to Avenue J-8 Ref. # 198
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:45 To 1:10
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 42
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.29
31 0 0.00% 0.00% 50th Percentile: 40
32 0 0.00% 0.00% 85th Percentile: 47
33 0 0.00% 0.00% 97th Percentile: 52
34 0 0.00% 0.00% 10 Mile Pace: 36 to 45
35 7 3.78% 3.78% % of Samples in 10-Mile Pace: 75.14%
36 11 5.95% 9.73% Comments:
37 13 7.03% 16.76%
38 12 6.49% 23.24%
39 25 13.51% 36.76%
40 25 13.51% 50.27%
41 15 8.11% 58.38%
42 13 7.03% 65.41%
43 10 5.41% 70.81%
44 7 3.78% 74.59%
45 8 4.32% 78.92%
46 5 2.70% 81.62%
47 9 4.86% 86.49%
48 3 1.62% 88.11%
49 7 3.78% 91.89%
50 7 3.78% 95.68%
51 2 1.08% 96.76%
52 4 2.16% 98.92%
53 1 0.54% 99.46%
54 1 0.54% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 185 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at Ave J-12
Between: Avenue J-8 to Avenue K Ref. # 199
Cumulative Date: 10/21&11/17/21 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:12/3:00 pm To 1:26/4:00 pm
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.34
31 0 0.00% 0.00% 50th Percentile: 44
32 0 0.00% 0.00% 85th Percentile: 50
33 0 0.00% 0.00% 97th Percentile: 54
34 0 0.00% 0.00% 10 Mile Pace: 39 to 48
35 2 0.92% 0.92% % of Samples in 10-Mile Pace: 67.74%
36 7 3.23% 4.15% Comments:
37 6 2.76% 6.91%
38 7 3.23% 10.14%
39 19 8.76% 18.89%
40 10 4.61% 23.50%
41 6 2.76% 26.27%
42 23 10.60% 36.87%
43 18 8.29% 45.16%
44 20 9.22% 54.38%
45 9 4.15% 58.53%
46 20 9.22% 67.74%
47 10 4.61% 72.35%
48 12 5.53% 77.88%
49 8 3.69% 81.57%
50 9 4.15% 85.71%
51 11 5.07% 90.78%
52 9 4.15% 94.93%
53 3 1.38% 96.31%
54 3 1.38% 97.70%
55 4 1.84% 99.54%
56 0 0.00% 99.54%
57 1 0.46% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 217 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at Ave K-4
Between: Avenue K to Avenue K-8 Ref. # 200
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:30 To 2:00
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 4
30 0 0.00% 0.00% Standard error of the mean: 0.33
31 0 0.00% 0.00% 50th Percentile: 40
32 0 0.00% 0.00% 85th Percentile: 46
33 0 0.00% 0.00% 97th Percentile: 51
34 0 0.00% 0.00% 10 Mile Pace: 36 to 45
35 5 3.47% 3.47% % of Samples in 10-Mile Pace: 81.25%
36 12 8.33% 11.81% Comments:
37 9 6.25% 18.06%
38 14 9.72% 27.78%
39 22 15.28% 43.06%
40 17 11.81% 54.86%
41 7 4.86% 59.72%
42 17 11.81% 71.53%
43 7 4.86% 76.39%
44 2 1.39% 77.78%
45 10 6.94% 84.72%
46 5 3.47% 88.19%
47 1 0.69% 88.89%
48 2 1.39% 90.28%
49 5 3.47% 93.75%
50 4 2.78% 96.53%
51 1 0.69% 97.22%
52 3 2.08% 99.31%
53 0 0.00% 99.31%
54 0 0.00% 99.31%
55 1 0.69% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 144 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at YMCA
Between: Avenue K-8 to Avenue L Ref. # 201
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:05 To 2:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.33
31 0 0.00% 0.00% 50th Percentile: 44
32 0 0.00% 0.00% 85th Percentile: 49
33 0 0.00% 0.00% 97th Percentile: 55
34 0 0.00% 0.00% 10 Mile Pace: 39 to 48
35 8 3.54% 3.54% % of Samples in 10-Mile Pace: 62.39%
36 15 6.64% 10.18% Comments:
37 10 4.42% 14.60%
38 6 2.65% 17.26%
39 20 8.85% 26.11%
40 22 9.73% 35.84%
41 12 5.31% 41.15%
42 13 5.75% 46.90%
43 5 2.21% 49.12%
44 15 6.64% 55.75%
45 19 8.41% 64.16%
46 13 5.75% 69.91%
47 12 5.31% 75.22%
48 10 4.42% 79.65%
49 14 6.19% 85.84%
50 12 5.31% 91.15%
51 2 0.88% 92.04%
52 9 3.98% 96.02%
53 1 0.44% 96.46%
54 1 0.44% 96.90%
55 2 0.88% 97.79%
56 0 0.00% 97.79%
57 2 0.88% 98.67%
58 1 0.44% 99.12%
59 1 0.44% 99.56%
60 1 0.44% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 226 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 10th Street West
Location: at Ave L-8
Between: Avenue L to Avenue M Ref. # 202
Cumulative Date: 10/21/2021 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:35 To 3:00
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 49
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.38
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 55
33 0 0.00% 0.00% 97th Percentile: 61
34 0 0.00% 0.00% 10 Mile Pace: 43 to 52
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 64.68%
36 3 1.19% 1.19% Comments:
37 1 0.40% 1.59%
38 3 1.19% 2.78%
39 8 3.17% 5.95%
40 7 2.78% 8.73%
41 5 1.98% 10.71%
42 7 2.78% 13.49%
43 7 2.78% 16.27%
44 14 5.56% 21.83%
45 10 3.97% 25.79%
46 28 11.11% 36.90%
47 14 5.56% 42.46%
48 17 6.75% 49.21%
49 26 10.32% 59.52%
50 22 8.73% 68.25%
51 10 3.97% 72.22%
52 15 5.95% 78.17%
53 7 2.78% 80.95%
54 5 1.98% 82.94%
55 7 2.78% 85.71%
56 6 2.38% 88.10%
57 8 3.17% 91.27%
58 7 2.78% 94.05%
59 4 1.59% 95.63%
60 3 1.19% 96.83%
61 4 1.59% 98.41%
62 1 0.40% 98.81%
63 2 0.79% 99.60%
64 0 0.00% 99.60%
65 0 0.00% 99.60%
66 1 0.40% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 252 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 7th Street West
Location: 400' n/o Ave G-12
Between: Avenue G-12 to Avenue H Ref. # 203
Cumulative Date: 10/26 & 11/17/21 Day: Tue & Wed
Speed Frequency Percent Percent Weather: Clear
20 2 2.50% 2.50% Hours: 9:00/2:35 To 10:00/2:50
21 1 1.25% 3.75% Recorder: DA/AY
22 0 0.00% 3.75% Posted Speed: 40
23 4 5.00% 8.75% Remarks:
24 2 2.50% 11.25%
25 1 1.25% 12.50%
26 6 7.50% 20.00%
27 2 2.50% 22.50% DATA ANALYSIS:
28 2 2.50% 25.00% Mean Speed: 32
29 8 10.00% 35.00% Standard Deviation: 6
30 2 2.50% 37.50% Standard error of the mean: 0.67
31 6 7.50% 45.00% 50th Percentile: 32
32 5 6.25% 51.25% 85th Percentile: 39
33 7 8.75% 60.00% 97th Percentile: 42
34 6 7.50% 67.50% 10 Mile Pace: 29 to 38
35 0 0.00% 67.50% % of Samples in 10-Mile Pace: 57.50%
36 3 3.75% 71.25% Comments:
37 2 2.50% 73.75%
38 7 8.75% 82.50%
39 5 6.25% 88.75%
40 5 6.25% 95.00%
41 0 0.00% 95.00%
42 3 3.75% 98.75%
43 0 0.00% 98.75%
44 1 1.25% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 80 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8 9Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 6th Street West
Location: n/o Ave L-14
Between: Avenue L-8 to Avenue M Ref. # 204
Cumulative Date: 10/26/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:05 To 12:45
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 5 4.55% 4.55%
26 5 4.55% 9.09%
27 6 5.45% 14.55% DATA ANALYSIS:
28 8 7.27% 21.82% Mean Speed: 34
29 11 10.00% 31.82% Standard Deviation: 6
30 6 5.45% 37.27% Standard error of the mean: 0.57
31 4 3.64% 40.91% 50th Percentile: 33
32 9 8.18% 49.09% 85th Percentile: 41
33 9 8.18% 57.27% 97th Percentile: 46
34 4 3.64% 60.91% 10 Mile Pace: 26 to 35
35 7 6.36% 67.27% % of Samples in 10-Mile Pace: 62.73%
36 4 3.64% 70.91% Comments:
37 6 5.45% 76.36%
38 3 2.73% 79.09%
39 4 3.64% 82.73%
40 2 1.82% 84.55%
41 3 2.73% 87.27%
42 3 2.73% 90.00%
43 3 2.73% 92.73%
44 0 0.00% 92.73%
45 2 1.82% 94.55%
46 3 2.73% 97.27%
47 0 0.00% 97.27%
48 0 0.00% 97.27%
49 0 0.00% 97.27%
50 0 0.00% 97.27%
51 0 0.00% 97.27%
52 0 0.00% 97.27%
53 0 0.00% 97.27%
54 3 2.73% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 110 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Gadsden Avenue
Location: at Ave K-4
Between: Avenue K to Avenue K-8 Ref. # 205
Cumulative Date: 10/26/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:15 To 11:58
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 35
23 2 1.46% 1.46% Remarks:
24 1 0.73% 2.19%
25 2 1.46% 3.65%
26 7 5.11% 8.76%
27 5 3.65% 12.41% DATA ANALYSIS:
28 7 5.11% 17.52% Mean Speed: 34
29 12 8.76% 26.28% Standard Deviation: 5
30 9 6.57% 32.85% Standard error of the mean: 0.43
31 6 4.38% 37.23% 50th Percentile: 34
32 2 1.46% 38.69% 85th Percentile: 38
33 12 8.76% 47.45% 97th Percentile: 43
34 10 7.30% 54.74% 10 Mile Pace: 29 to 38
35 13 9.49% 64.23% % of Samples in 10-Mile Pace: 68.61% 36 12 8.76% 72.99% Comments:
37 8 5.84% 78.83%
38 10 7.30% 86.13%
39 5 3.65% 89.78%
40 2 1.46% 91.24%
41 2 1.46% 92.70%
42 5 3.65% 96.35%
43 1 0.73% 97.08%
44 0 0.00% 97.08%
45 0 0.00% 97.08%
46 2 1.46% 98.54%
47 1 0.73% 99.27%
48 0 0.00% 99.27%
49 0 0.00% 99.27%
50 0 0.00% 99.27%
51 0 0.00% 99.27%
52 0 0.00% 99.27%
53 0 0.00% 99.27%
54 1 0.73% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 137 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Yucca Avenue
Location: s/o Jackman St
Between: Avenue I to Lancaster Blvd Ref. # 214
Cumulative Date: 10/26/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 1 0.66% 0.66% Hours: 2:05 To 3:00
21 0 0.00% 0.66% Recorder: DA
22 0 0.00% 0.66% Posted Speed: 40
23 1 0.66% 1.32% Remarks:
24 2 1.32% 2.65%
25 6 3.97% 6.62%
26 4 2.65% 9.27%
27 9 5.96% 15.23% DATA ANALYSIS:
28 4 2.65% 17.88% Mean Speed: 37
29 9 5.96% 23.84% Standard Deviation: 8
30 0 0.00% 23.84% Standard error of the mean: 0.65
31 3 1.99% 25.83% 50th Percentile: 36
32 6 3.97% 29.80% 85th Percentile: 45
33 10 6.62% 36.42% 97th Percentile: 54
34 2 1.32% 37.75% 10 Mile Pace: 33 to 42
35 7 4.64% 42.38% % of Samples in 10-Mile Pace: 50.33%
36 13 8.61% 50.99% Comments:
37 8 5.30% 56.29%
38 6 3.97% 60.26%
39 12 7.95% 68.21%
40 2 1.32% 69.54%
41 6 3.97% 73.51%
42 10 6.62% 80.13%
43 3 1.99% 82.12%
44 4 2.65% 84.77%
45 4 2.65% 87.42%
46 5 3.31% 90.73%
47 2 1.32% 92.05%
48 3 1.99% 94.04%
49 0 0.00% 94.04%
50 3 1.99% 96.03%
51 0 0.00% 96.03%
52 1 0.66% 96.69%
53 0 0.00% 96.69%
54 3 1.99% 98.68%
55 0 0.00% 98.68%
56 1 0.66% 99.34%
57 0 0.00% 99.34%
58 0 0.00% 99.34%
59 0 0.00% 99.34%
60 1 0.66% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 151 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Yucca Avenue
Location: s/o Lumber St
Between: Lancaster Blvd to Milling Ref. # 215
Cumulative Date: 10/26/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:30 To 2:00
21 4 2.44% 2.44% Recorder: DA
22 4 2.44% 4.88% Posted Speed: 40
23 10 6.10% 10.98% Remarks:
24 4 2.44% 13.41%
25 6 3.66% 17.07%
26 17 10.37% 27.44%
27 9 5.49% 32.93% DATA ANALYSIS:
28 16 9.76% 42.68% Mean Speed: 29
29 20 12.20% 54.88% Standard Deviation: 4
30 17 10.37% 65.24% Standard error of the mean: 0.31
31 16 9.76% 75.00% 50th Percentile: 29
32 9 5.49% 80.49% 85th Percentile: 33
33 11 6.71% 87.20% 97th Percentile: 38
34 6 3.66% 90.85% 10 Mile Pace: 25 to 34
35 4 2.44% 93.29% % of Samples in 10-Mile Pace: 77.44%
36 4 2.44% 95.73% Comments:
37 2 1.22% 96.95%
38 3 1.83% 98.78%
39 2 1.22% 100.00%
40 0 0.00% 100.00%
41 0 0.00% 100.00%
42 0 0.00% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 164 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Trevor Avenue
Location: at Ave H-6
Between: Avenue H to Avenue I Ref. # 216
Cumulative Date: 10/26/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:05 To 11:00
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 1 1.39% 1.39%
25 2 2.78% 4.17%
26 1 1.39% 5.56%
27 3 4.17% 9.72% DATA ANALYSIS:
28 1 1.39% 11.11% Mean Speed: 39
29 0 0.00% 11.11% Standard Deviation: 7
30 2 2.78% 13.89% Standard error of the mean: 0.82
31 3 4.17% 18.06% 50th Percentile: 38
32 1 1.39% 19.44% 85th Percentile: 48
33 2 2.78% 22.22% 97th Percentile: 51
34 4 5.56% 27.78% 10 Mile Pace: 34 to 43
35 3 4.17% 31.94% % of Samples in 10-Mile Pace: 54.17%
36 6 8.33% 40.28% Comments:
37 5 6.94% 47.22%
38 2 2.78% 50.00%
39 6 8.33% 58.33%
40 3 4.17% 62.50%
41 3 4.17% 66.67%
42 4 5.56% 72.22%
43 3 4.17% 76.39%
44 1 1.39% 77.78%
45 0 0.00% 77.78%
46 4 5.56% 83.33%
47 1 1.39% 84.72%
48 1 1.39% 86.11%
49 2 2.78% 88.89%
50 5 6.94% 95.83%
51 1 1.39% 97.22%
52 2 2.78% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 72 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: Business Center Parkway
Location: s/o Ave K-10
Between: Avenue K-8 to Avenue L Ref. # 225
Cumulative Date: 10/26/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:55 To 1:20
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 44
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.35
31 0 0.00% 0.00% 50th Percentile: 44
32 0 0.00% 0.00% 85th Percentile: 49
33 0 0.00% 0.00% 97th Percentile: 55
34 0 0.00% 0.00% 10 Mile Pace: 39 to 48
35 9 4.39% 4.39% % of Samples in 10-Mile Pace: 68.29%
36 6 2.93% 7.32% Comments:
37 3 1.46% 8.78%
38 6 2.93% 11.71%
39 14 6.83% 18.54%
40 17 8.29% 26.83%
41 5 2.44% 29.27%
42 24 11.71% 40.98%
43 9 4.39% 45.37%
44 12 5.85% 51.22%
45 16 7.80% 59.02%
46 22 10.73% 69.76%
47 9 4.39% 74.15%
48 12 5.85% 80.00%
49 11 5.37% 85.37%
50 9 4.39% 89.76%
51 5 2.44% 92.20%
52 5 2.44% 94.63%
53 2 0.98% 95.61%
54 2 0.98% 96.59%
55 2 0.98% 97.56%
56 0 0.00% 97.56%
57 0 0.00% 97.56%
58 1 0.49% 98.05%
59 0 0.00% 98.05%
60 1 0.49% 98.54%
61 1 0.49% 99.02%
62 1 0.49% 99.51%
63 0 0.00% 99.51%
64 0 0.00% 99.51%
65 0 0.00% 99.51%
66 0 0.00% 99.51%
67 1 0.49% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 205 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 3rd Street East
Location: at Kettering St
Between: Avenue I to Lancaster Blvd Ref. # 226
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:00 To 9:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 35
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 1 1.67% 1.67%
26 2 3.33% 5.00%
27 2 3.33% 8.33% DATA ANALYSIS:
28 3 5.00% 13.33% Mean Speed: 35
29 8 13.33% 26.67% Standard Deviation: 6
30 3 5.00% 31.67% Standard error of the mean: 0.77
31 2 3.33% 35.00% 50th Percentile: 35
32 2 3.33% 38.33% 85th Percentile: 40
33 2 3.33% 41.67% 97th Percentile: 50
34 3 5.00% 46.67% 10 Mile Pace: 29 to 38
35 6 10.00% 56.67% % of Samples in 10-Mile Pace: 63.33% 36 5 8.33% 65.00% Comments:
37 1 1.67% 66.67%
38 6 10.00% 76.67%
39 3 5.00% 81.67%
40 3 5.00% 86.67%
41 2 3.33% 90.00%
42 2 3.33% 93.33%
43 0 0.00% 93.33%
44 0 0.00% 93.33%
45 0 0.00% 93.33%
46 2 3.33% 96.67%
47 0 0.00% 96.67%
48 0 0.00% 96.67%
49 0 0.00% 96.67%
50 1 1.67% 98.33%
51 1 1.67% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 60 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8 9Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 4th Street East
Location: at Ave L-4
Between: Avenue L to Avenue M Ref. # 227
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:45 To 10:15
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 1 0.99% 0.99%
26 0 0.00% 0.99%
27 0 0.00% 0.99% DATA ANALYSIS:
28 1 0.99% 1.98% Mean Speed: 44
29 2 1.98% 3.96% Standard Deviation: 7
30 0 0.00% 3.96% Standard error of the mean: 0.7
31 0 0.00% 3.96% 50th Percentile: 44
32 2 1.98% 5.94% 85th Percentile: 51
33 4 3.96% 9.90% 97th Percentile: 54
34 2 1.98% 11.88% 10 Mile Pace: 38 to 47
35 2 1.98% 13.86% % of Samples in 10-Mile Pace: 60.40%
36 1 0.99% 14.85% Comments:
37 1 0.99% 15.84%
38 3 2.97% 18.81%
39 6 5.94% 24.75%
40 6 5.94% 30.69%
41 3 2.97% 33.66%
42 7 6.93% 40.59%
43 2 1.98% 42.57%
44 11 10.89% 53.47%
45 7 6.93% 60.40%
46 10 9.90% 70.30%
47 6 5.94% 76.24%
48 0 0.00% 76.24%
49 5 4.95% 81.19%
50 3 2.97% 84.16%
51 2 1.98% 86.14%
52 5 4.95% 91.09%
53 4 3.96% 95.05%
54 2 1.98% 97.03%
55 0 0.00% 97.03%
56 0 0.00% 97.03%
57 0 0.00% 97.03%
58 2 1.98% 99.01%
59 0 0.00% 99.01%
60 1 0.99% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 101 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 5th Street East
Location: at Ave K-4
Between: Avenue K to Avenue K-8 Ref. # 232
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:25 To 11:00
21 0 0.00% 0.00% Recorder: DA
22 1 1.11% 1.11% Posted Speed: 40
23 0 0.00% 1.11% Remarks:
24 0 0.00% 1.11%
25 1 1.11% 2.22%
26 0 0.00% 2.22%
27 0 0.00% 2.22% DATA ANALYSIS:
28 1 1.11% 3.33% Mean Speed: 36
29 5 5.56% 8.89% Standard Deviation: 5
30 7 7.78% 16.67% Standard error of the mean: 0.53
31 2 2.22% 18.89% 50th Percentile: 36
32 5 5.56% 24.44% 85th Percentile: 42
33 10 11.11% 35.56% 97th Percentile: 47
34 3 3.33% 38.89% 10 Mile Pace: 30 to 39
35 1 1.11% 40.00% % of Samples in 10-Mile Pace: 67.78%
36 17 18.89% 58.89% Comments:
37 1 1.11% 60.00%
38 6 6.67% 66.67%
39 9 10.00% 76.67%
40 4 4.44% 81.11%
41 2 2.22% 83.33%
42 6 6.67% 90.00%
43 3 3.33% 93.33%
44 2 2.22% 95.56%
45 0 0.00% 95.56%
46 1 1.11% 96.67%
47 1 1.11% 97.78%
48 0 0.00% 97.78%
49 1 1.11% 98.89%
50 0 0.00% 98.89%
51 1 1.11% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 90 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 15th Street East
Location: 300' n/o Ave I
Between: Avenue H-12 to Avenue I Ref. # 240
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:35 To 3:15
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 35
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 1 0.74% 0.74%
26 1 0.74% 1.47%
27 1 0.74% 2.21% DATA ANALYSIS:
28 5 3.68% 5.88% Mean Speed: 36
29 7 5.15% 11.03% Standard Deviation: 5
30 6 4.41% 15.44% Standard error of the mean: 0.43
31 7 5.15% 20.59% 50th Percentile: 35
32 5 3.68% 24.26% 85th Percentile: 41
33 16 11.76% 36.03% 97th Percentile: 46
34 8 5.88% 41.91% 10 Mile Pace: 29 to 38
35 11 8.09% 50.00% % of Samples in 10-Mile Pace: 71.32% 36 18 13.24% 63.24% Comments:
37 8 5.88% 69.12%
38 11 8.09% 77.21%
39 7 5.15% 82.35%
40 2 1.47% 83.82%
41 6 4.41% 88.24%
42 5 3.68% 91.91%
43 0 0.00% 91.91%
44 2 1.47% 93.38%
45 2 1.47% 94.85%
46 3 2.21% 97.06%
47 1 0.74% 97.79%
48 0 0.00% 97.79%
49 0 0.00% 97.79%
50 1 0.74% 98.53%
51 0 0.00% 98.53%
52 0 0.00% 98.53%
53 0 0.00% 98.53%
54 2 1.47% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 136 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 15th Street East
Location: at Kettering St
Between: Avenue I to Lancaster Blvd Ref. # 241
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:00 To 2:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 6
30 1 0.81% 0.81% Standard error of the mean: 0.54
31 1 0.81% 1.63% 50th Percentile: 45
32 1 0.81% 2.44% 85th Percentile: 50
33 1 0.81% 3.25% 97th Percentile: 56
34 2 1.63% 4.88% 10 Mile Pace: 41 to 50
35 2 1.63% 6.50% % of Samples in 10-Mile Pace: 60.98%
36 8 6.50% 13.01% Comments:
37 3 2.44% 15.45%
38 1 0.81% 16.26%
39 5 4.07% 20.33%
40 5 4.07% 24.39%
41 7 5.69% 30.08%
42 11 8.94% 39.02%
43 5 4.07% 43.09%
44 8 6.50% 49.59%
45 7 5.69% 55.28%
46 8 6.50% 61.79%
47 9 7.32% 69.11%
48 4 3.25% 72.36%
49 9 7.32% 79.67%
50 7 5.69% 85.37%
51 1 0.81% 86.18%
52 5 4.07% 90.24%
53 4 3.25% 93.50%
54 2 1.63% 95.12%
55 2 1.63% 96.75%
56 1 0.81% 97.56%
57 2 1.63% 99.19%
58 0 0.00% 99.19%
59 0 0.00% 99.19%
60 0 0.00% 99.19%
61 0 0.00% 99.19%
62 1 0.81% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 123 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 15th Street East
Location: at Willow Creek Condo
Between: Lancaster Blvd to Avenue J Ref. # 242
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:25 To 1:55
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 46
29 0 0.00% 0.00% Standard Deviation: 6
30 1 0.56% 0.56% Standard error of the mean: 0.45
31 1 0.56% 1.12% 50th Percentile: 45
32 0 0.00% 1.12% 85th Percentile: 51
33 2 1.12% 2.23% 97th Percentile: 56
34 0 0.00% 2.23% 10 Mile Pace: 42 to 51
35 2 1.12% 3.35% % of Samples in 10-Mile Pace: 65.92%
36 5 2.79% 6.15% Comments:
37 3 1.68% 7.82%
38 7 3.91% 11.73%
39 7 3.91% 15.64%
40 3 1.68% 17.32%
41 4 2.23% 19.55%
42 18 10.06% 29.61%
43 13 7.26% 36.87%
44 12 6.70% 43.58%
45 13 7.26% 50.84%
46 12 6.70% 57.54%
47 7 3.91% 61.45%
48 12 6.70% 68.16%
49 14 7.82% 75.98%
50 12 6.70% 82.68%
51 5 2.79% 85.47%
52 7 3.91% 89.39%
53 3 1.68% 91.06%
54 2 1.12% 92.18%
55 4 2.23% 94.41%
56 5 2.79% 97.21%
57 1 0.56% 97.77%
58 1 0.56% 98.32%
59 2 1.12% 99.44%
60 1 0.56% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 179 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 15th Street East
Location: at Ave J-4
Between: Avenue J to Avenue J-8 Ref. # 243
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:45 To 1:15
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 6
30 1 0.83% 0.83% Standard error of the mean: 0.55
31 0 0.00% 0.83% 50th Percentile: 44
32 0 0.00% 0.83% 85th Percentile: 52
33 2 1.65% 2.48% 97th Percentile: 56
34 1 0.83% 3.31% 10 Mile Pace: 39 to 48
35 1 0.83% 4.13% % of Samples in 10-Mile Pace: 59.50%
36 4 3.31% 7.44% Comments:
37 4 3.31% 10.74%
38 1 0.83% 11.57%
39 6 4.96% 16.53%
40 5 4.13% 20.66%
41 6 4.96% 25.62%
42 17 14.05% 39.67%
43 5 4.13% 43.80%
44 8 6.61% 50.41%
45 9 7.44% 57.85%
46 7 5.79% 63.64%
47 5 4.13% 67.77%
48 4 3.31% 71.07%
49 6 4.96% 76.03%
50 3 2.48% 78.51%
51 3 2.48% 80.99%
52 7 5.79% 86.78%
53 5 4.13% 90.91%
54 1 0.83% 91.74%
55 3 2.48% 94.21%
56 5 4.13% 98.35%
57 1 0.83% 99.17%
58 1 0.83% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 121 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 15th Street East
Location: at Ave J-12
Between: Avenue J-8 to Avenue K Ref. # 244
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:05 To 12:35
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 45
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.43
31 0 0.00% 0.00% 50th Percentile: 45
32 0 0.00% 0.00% 85th Percentile: 51
33 1 0.72% 0.72% 97th Percentile: 54
34 0 0.00% 0.72% 10 Mile Pace: 39 to 48
35 0 0.00% 0.72% % of Samples in 10-Mile Pace: 68.84%
36 2 1.45% 2.17% Comments:
37 0 0.00% 2.17%
38 3 2.17% 4.35%
39 12 8.70% 13.04%
40 5 3.62% 16.67%
41 4 2.90% 19.57%
42 12 8.70% 28.26%
43 13 9.42% 37.68%
44 12 8.70% 46.38%
45 12 8.70% 55.07%
46 9 6.52% 61.59%
47 8 5.80% 67.39%
48 8 5.80% 73.19%
49 8 5.80% 78.99%
50 7 5.07% 84.06%
51 5 3.62% 87.68%
52 9 6.52% 94.20%
53 1 0.72% 94.93%
54 3 2.17% 97.10%
55 2 1.45% 98.55%
56 0 0.00% 98.55%
57 0 0.00% 98.55%
58 0 0.00% 98.55%
59 2 1.45% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 138 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 15th Street East
Location: at Marion Ave
Between: Avenue K to Avenue K-8 Ref. # 245
Cumulative Date: 10/27/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:10 To 11:45
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 5
30 3 3.85% 3.85% Standard error of the mean: 0.57
31 0 0.00% 3.85% 50th Percentile: 41
32 0 0.00% 3.85% 85th Percentile: 46
33 2 2.56% 6.41% 97th Percentile: 50
34 1 1.28% 7.69% 10 Mile Pace: 38 to 47
35 1 1.28% 8.97% % of Samples in 10-Mile Pace: 76.92%
36 3 3.85% 12.82% Comments:
37 2 2.56% 15.38%
38 4 5.13% 20.51%
39 14 17.95% 38.46%
40 4 5.13% 43.59%
41 5 6.41% 50.00%
42 11 14.10% 64.10%
43 3 3.85% 67.95%
44 9 11.54% 79.49%
45 4 5.13% 84.62%
46 1 1.28% 85.90%
47 5 6.41% 92.31%
48 1 1.28% 93.59%
49 2 2.56% 96.15%
50 2 2.56% 98.72%
51 0 0.00% 98.72%
52 1 1.28% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 78 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 20th Street East
Location: at Ave H-4
Between: Avenue H to Avenue I Ref. # 246
Cumulative Date: 11/1/2021 Day: Monday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:00 To 10:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 52
29 0 0.00% 0.00% Standard Deviation: 7
30 0 0.00% 0.00% Standard error of the mean: 0.76
31 0 0.00% 0.00% 50th Percentile: 52
32 0 0.00% 0.00% 85th Percentile: 57
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 48 to 57
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 60.71%
36 2 2.38% 2.38% Comments:
37 0 0.00% 2.38%
38 0 0.00% 2.38%
39 1 1.19% 3.57%
40 0 0.00% 3.57%
41 0 0.00% 3.57%
42 2 2.38% 5.95%
43 4 4.76% 10.71%
44 3 3.57% 14.29%
45 3 3.57% 17.86%
46 5 5.95% 23.81%
47 1 1.19% 25.00%
48 2 2.38% 27.38%
49 9 10.71% 38.10%
50 0 0.00% 38.10%
51 2 2.38% 40.48%
52 11 13.10% 53.57%
53 8 9.52% 63.10%
54 5 5.95% 69.05%
55 4 4.76% 73.81%
56 8 9.52% 83.33%
57 2 2.38% 85.71%
58 1 1.19% 86.90%
59 0 0.00% 86.90%
60 1 1.19% 88.10%
61 1 1.19% 89.29%
62 2 2.38% 91.67%
63 0 0.00% 91.67%
64 0 0.00% 91.67%
65 2 2.38% 94.05%
66 3 3.57% 97.62%
67 0 0.00% 97.62%
68 1 1.19% 98.81%
69 0 0.00% 98.81%
70 1 1.19% 100.00%
Total: 84 100%
spd_form.xls
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 20th Street East
Location: at Kettering St
Between: Avenue I to Lancaster Blvd Ref. # 247
Cumulative Date: 11/1/2021 Day: Monday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:35 To 11:05
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 47
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.4
31 0 0.00% 0.00% 50th Percentile: 47
32 0 0.00% 0.00% 85th Percentile: 53
33 0 0.00% 0.00% 97th Percentile: 61
34 0 0.00% 0.00% 10 Mile Pace: 42 to 51
35 2 0.90% 0.90% % of Samples in 10-Mile Pace: 66.06%
36 2 0.90% 1.81% Comments:
37 4 1.81% 3.62%
38 4 1.81% 5.43%
39 8 3.62% 9.05%
40 8 3.62% 12.67%
41 4 1.81% 14.48%
42 10 4.52% 19.00%
43 8 3.62% 22.62%
44 20 9.05% 31.67%
45 19 8.60% 40.27%
46 16 7.24% 47.51%
47 16 7.24% 54.75%
48 18 8.14% 62.90%
49 13 5.88% 68.78%
50 18 8.14% 76.92%
51 8 3.62% 80.54%
52 8 3.62% 84.16%
53 2 0.90% 85.07%
54 4 1.81% 86.88%
55 6 2.71% 89.59%
56 8 3.62% 93.21%
57 0 0.00% 93.21%
58 4 1.81% 95.02%
59 4 1.81% 96.83%
60 0 0.00% 96.83%
61 4 1.81% 98.64%
62 0 0.00% 98.64%
63 3 1.36% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 221 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 20th Street East
Location: at Nugent St
Between: Lancaster Blvd to Avenue J Ref. # 248
Cumulative Date: 11/1/2021 Day: Monday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:10 To 11:45
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 47
29 0 0.00% 0.00% Standard Deviation: 7
30 0 0.00% 0.00% Standard error of the mean: 0.47
31 0 0.00% 0.00% 50th Percentile: 46
32 0 0.00% 0.00% 85th Percentile: 55
33 0 0.00% 0.00% 97th Percentile: 61
34 0 0.00% 0.00% 10 Mile Pace: 39 to 48
35 4 1.81% 1.81% % of Samples in 10-Mile Pace: 56.11%
36 2 0.90% 2.71% Comments:
37 2 0.90% 3.62%
38 3 1.36% 4.98%
39 19 8.60% 13.57%
40 12 5.43% 19.00%
41 11 4.98% 23.98%
42 14 6.33% 30.32%
43 13 5.88% 36.20%
44 14 6.33% 42.53%
45 7 3.17% 45.70%
46 11 4.98% 50.68%
47 9 4.07% 54.75%
48 14 6.33% 61.09%
49 8 3.62% 64.71%
50 17 7.69% 72.40%
51 10 4.52% 76.92%
52 10 4.52% 81.45%
53 6 2.71% 84.16%
54 0 0.00% 84.16%
55 6 2.71% 86.88%
56 10 4.52% 91.40%
57 10 4.52% 95.93%
58 0 0.00% 95.93%
59 2 0.90% 96.83%
60 0 0.00% 96.83%
61 2 0.90% 97.74%
62 2 0.90% 98.64%
63 0 0.00% 98.64%
64 1 0.45% 99.10%
65 0 0.00% 99.10%
66 0 0.00% 99.10%
67 2 0.90% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 221 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18
20Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 20th Street East
Location: at Ave J-4
Between: Avenue J to Avenue J-8 Ref. # 249
Cumulative Date: 11/1/2021 Day: Monday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:10 To 12:40
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 46
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.34
31 0 0.00% 0.00% 50th Percentile: 46
32 0 0.00% 0.00% 85th Percentile: 52
33 0 0.00% 0.00% 97th Percentile: 58
34 0 0.00% 0.00% 10 Mile Pace: 41 to 50
35 3 0.94% 0.94% % of Samples in 10-Mile Pace: 64.47%
36 12 3.77% 4.72% Comments:
37 4 1.26% 5.97%
38 2 0.63% 6.60%
39 10 3.14% 9.75%
40 16 5.03% 14.78%
41 17 5.35% 20.13%
42 20 6.29% 26.42%
43 13 4.09% 30.50%
44 25 7.86% 38.36%
45 14 4.40% 42.77%
46 33 10.38% 53.14%
47 14 4.40% 57.55%
48 16 5.03% 62.58%
49 24 7.55% 70.13%
50 29 9.12% 79.25%
51 14 4.40% 83.65%
52 12 3.77% 87.42%
53 8 2.52% 89.94%
54 2 0.63% 90.57%
55 8 2.52% 93.08%
56 8 2.52% 95.60%
57 4 1.26% 96.86%
58 3 0.94% 97.80%
59 2 0.63% 98.43%
60 0 0.00% 98.43%
61 2 0.63% 99.06%
62 2 0.63% 99.69%
63 0 0.00% 99.69%
64 0 0.00% 99.69%
65 1 0.31% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 318 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30 35Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 20th Street East
Location: n/o Acosta Ave
Between: Avenue J-8 to Avenue K Ref. # 250
Cumulative Date: 11/1/2021 Day: Monday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:45 To 1:15
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 49
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.36
31 0 0.00% 0.00% 50th Percentile: 50
32 0 0.00% 0.00% 85th Percentile: 55
33 0 0.00% 0.00% 97th Percentile: 61
34 2 0.72% 0.72% 10 Mile Pace: 46 to 55
35 0 0.00% 0.72% % of Samples in 10-Mile Pace: 60.57%
36 2 0.72% 1.43% Comments:
37 6 2.15% 3.58%
38 9 3.23% 6.81%
39 4 1.43% 8.24%
40 5 1.79% 10.04%
41 11 3.94% 13.98%
42 11 3.94% 17.92%
43 6 2.15% 20.07%
44 8 2.87% 22.94%
45 8 2.87% 25.81%
46 16 5.73% 31.54%
47 12 4.30% 35.84%
48 14 5.02% 40.86%
49 24 8.60% 49.46%
50 21 7.53% 56.99%
51 18 6.45% 63.44%
52 26 9.32% 72.76%
53 8 2.87% 75.63%
54 18 6.45% 82.08%
55 12 4.30% 86.38%
56 2 0.72% 87.10%
57 4 1.43% 88.53%
58 6 2.15% 90.68%
59 6 2.15% 92.83%
60 6 2.15% 94.98%
61 6 2.15% 97.13%
62 4 1.43% 98.57%
63 3 1.08% 99.64%
64 1 0.36% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 279 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 20th Street East
Location: at Ave K-8
Between: Avenue K to Avenue L Ref. # 251
Cumulative Date: 11/1/2021 Day: Monday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:20 To 1:50
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 54
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.43
31 0 0.00% 0.00% 50th Percentile: 53
32 0 0.00% 0.00% 85th Percentile: 60
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 50 to 59
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 58.76%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 0 0.00% 0.00%
40 0 0.00% 0.00%
41 0 0.00% 0.00%
42 0 0.00% 0.00%
43 4 2.06% 2.06%
44 5 2.58% 4.64%
45 0 0.00% 4.64%
46 10 5.15% 9.79%
47 6 3.09% 12.89%
48 10 5.15% 18.04%
49 14 7.22% 25.26%
50 14 7.22% 32.47%
51 16 8.25% 40.72%
52 12 6.19% 46.91%
53 6 3.09% 50.00%
54 10 5.15% 55.15%
55 6 3.09% 58.25%
56 14 7.22% 65.46%
57 10 5.15% 70.62%
58 10 5.15% 75.77%
59 16 8.25% 84.02%
60 2 1.03% 85.05%
61 4 2.06% 87.11%
62 12 6.19% 93.30%
63 0 0.00% 93.30%
64 2 1.03% 94.33%
65 0 0.00% 94.33%
66 0 0.00% 94.33%
67 5 2.58% 96.91%
68 0 0.00% 96.91%
69 2 1.03% 97.94%
70 4 2.06% 100.00%
Total: 194 100%
spd_form.xls
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16 18Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 25th Street East
Location: 400' n/o Ave I
Between: Avenue H-8 to Avenue I Ref. # 252
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:45 To 1:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 1 1.22% 1.22% Mean Speed: 40
29 2 2.44% 3.66% Standard Deviation: 6
30 1 1.22% 4.88% Standard error of the mean: 0.66
31 0 0.00% 4.88% 50th Percentile: 39
32 0 0.00% 4.88% 85th Percentile: 46
33 5 6.10% 10.98% 97th Percentile: 51
34 3 3.66% 14.63% 10 Mile Pace: 35 to 44
35 2 2.44% 17.07% % of Samples in 10-Mile Pace: 67.07%
36 12 14.63% 31.71% Comments:
37 6 7.32% 39.02%
38 7 8.54% 47.56%
39 3 3.66% 51.22%
40 8 9.76% 60.98%
41 2 2.44% 63.41%
42 5 6.10% 69.51%
43 3 3.66% 73.17%
44 7 8.54% 81.71%
45 2 2.44% 84.15%
46 2 2.44% 86.59%
47 0 0.00% 86.59%
48 0 0.00% 86.59%
49 5 6.10% 92.68%
50 3 3.66% 96.34%
51 1 1.22% 97.56%
52 0 0.00% 97.56%
53 0 0.00% 97.56%
54 1 1.22% 98.78%
55 1 1.22% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 82 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 25th Street East
Location: at Kettering St
Between: Avenue I to Lancaster Blvd Ref. # 253
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:50 To 12:20
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 41
29 0 0.00% 0.00% Standard Deviation: 5
30 4 5.26% 5.26% Standard error of the mean: 0.57
31 0 0.00% 5.26% 50th Percentile: 41
32 2 2.63% 7.89% 85th Percentile: 46
33 0 0.00% 7.89% 97th Percentile: 52
34 0 0.00% 7.89% 10 Mile Pace: 37 to 46
35 0 0.00% 7.89% % of Samples in 10-Mile Pace: 81.58%
36 2 2.63% 10.53% Comments:
37 4 5.26% 15.79%
38 9 11.84% 27.63%
39 10 13.16% 40.79%
40 4 5.26% 46.05%
41 9 11.84% 57.89%
42 8 10.53% 68.42%
43 0 0.00% 68.42%
44 4 5.26% 73.68%
45 8 10.53% 84.21%
46 6 7.89% 92.11%
47 0 0.00% 92.11%
48 0 0.00% 92.11%
49 2 2.63% 94.74%
50 0 0.00% 94.74%
51 0 0.00% 94.74%
52 2 2.63% 97.37%
53 0 0.00% 97.37%
54 0 0.00% 97.37%
55 2 2.63% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 76 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 25th Street East
Location: at Nugent St
Between: Lancaster Blvd to Avenue J Ref. # 254
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:15 To 11:45
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 45
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 43
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.56
31 0 0.00% 0.00% 50th Percentile: 42
32 0 0.00% 0.00% 85th Percentile: 49
33 1 1.27% 1.27% 97th Percentile: 54
34 0 0.00% 1.27% 10 Mile Pace: 36 to 45
35 6 7.59% 8.86% % of Samples in 10-Mile Pace: 65.82%
36 4 5.06% 13.92% Comments:
37 4 5.06% 18.99%
38 8 10.13% 29.11%
39 4 5.06% 34.18%
40 0 0.00% 34.18%
41 8 10.13% 44.30%
42 10 12.66% 56.96%
43 4 5.06% 62.03%
44 1 1.27% 63.29%
45 9 11.39% 74.68%
46 4 5.06% 79.75%
47 0 0.00% 79.75%
48 3 3.80% 83.54%
49 3 3.80% 87.34%
50 3 3.80% 91.14%
51 2 2.53% 93.67%
52 2 2.53% 96.20%
53 0 0.00% 96.20%
54 2 2.53% 98.73%
55 0 0.00% 98.73%
56 0 0.00% 98.73%
57 0 0.00% 98.73%
58 0 0.00% 98.73%
59 0 0.00% 98.73%
60 1 1.27% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 79 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 25th Street East
Location: 300' s/o Ave J
Between: Avenue J to Avenue J-4 Ref. # 255
Cumulative Date: 11/2 & 11/9/21 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:10/3:40 To 11:10/4:40
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 38
29 0 0.00% 0.00% Standard Deviation: 5
30 4 5.63% 5.63% Standard error of the mean: 0.59
31 0 0.00% 5.63% 50th Percentile: 38
32 0 0.00% 5.63% 85th Percentile: 43
33 4 5.63% 11.27% 97th Percentile: 49
34 5 7.04% 18.31% 10 Mile Pace: 33 to 42
35 5 7.04% 25.35% % of Samples in 10-Mile Pace: 77.46%
36 12 16.90% 42.25% Comments:
37 4 5.63% 47.89%
38 5 7.04% 54.93%
39 9 12.68% 67.61%
40 6 8.45% 76.06%
41 4 5.63% 81.69%
42 1 1.41% 83.10%
43 3 4.23% 87.32%
44 0 0.00% 87.32%
45 2 2.82% 90.14%
46 4 5.63% 95.77%
47 0 0.00% 95.77%
48 0 0.00% 95.77%
49 1 1.41% 97.18%
50 0 0.00% 97.18%
51 0 0.00% 97.18%
52 2 2.82% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 71 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 25th Street East
Location: at Morningside Ave
Between: Avenue J-8 to Avenue K Ref. # 256
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:30 To 10:00
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 2 2.70% 2.70% Mean Speed: 41
29 4 5.41% 8.11% Standard Deviation: 8
30 2 2.70% 10.81% Standard error of the mean: 0.93
31 0 0.00% 10.81% 50th Percentile: 39
32 0 0.00% 10.81% 85th Percentile: 50
33 4 5.41% 16.22% 97th Percentile: 55
34 4 5.41% 21.62% 10 Mile Pace: 30 to 39
35 3 4.05% 25.68% % of Samples in 10-Mile Pace: 44.59%
36 8 10.81% 36.49% Comments:
37 3 4.05% 40.54%
38 3 4.05% 44.59%
39 6 8.11% 52.70%
40 1 1.35% 54.05%
41 1 1.35% 55.41%
42 0 0.00% 55.41%
43 0 0.00% 55.41%
44 7 9.46% 64.86%
45 2 2.70% 67.57%
46 4 5.41% 72.97%
47 0 0.00% 72.97%
48 3 4.05% 77.03%
49 5 6.76% 83.78%
50 2 2.70% 86.49%
51 0 0.00% 86.49%
52 2 2.70% 89.19%
53 0 0.00% 89.19%
54 2 2.70% 91.89%
55 4 5.41% 97.30%
56 0 0.00% 97.30%
57 0 0.00% 97.30%
58 2 2.70% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 74 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8 9Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 25th Street East
Location: 350 feet south of Avenue K
Between: Avenue K to Avenue K-4 Ref. # 257
Cumulative Date: 11/1 & 12/15/21 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:00 /11:00 To 3:00/12:00
21 0 0.00% 0.00% Recorder: DA/AY
22 0 0.00% 0.00% Posted Speed: 35
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 1 2.33% 2.33% DATA ANALYSIS:
28 6 13.95% 16.28% Mean Speed: 32
29 5 11.63% 27.91% Standard Deviation: 4
30 10 23.26% 51.16% Standard error of the mean: 0.61
31 1 2.33% 53.49% 50th Percentile: 30
32 5 11.63% 65.12% 85th Percentile: 36
33 5 11.63% 76.74% 97th Percentile: 42
34 0 0.00% 76.74% 10 Mile Pace: 27 to 36
35 2 4.65% 81.40% % of Samples in 10-Mile Pace: 86.05%
36 2 4.65% 86.05% Comments:
37 0 0.00% 86.05%
38 0 0.00% 86.05%
39 3 6.98% 93.02%
40 0 0.00% 93.02%
41 1 2.33% 95.35%
42 2 4.65% 100.00%
43 0 0.00% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 43 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 26th Street East
Location: 700 feet west of Avenue I
Between: Avenue H-8 to Avenue I Ref. # 258
Cumulative Date: 11/1 & 12/2/21 Day: Thursday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:35/7:45 To 2:30/9:00
21 0 0.00% 0.00% Recorder: DA/AY
22 0 0.00% 0.00% Posted Speed: 35
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 4 3.74% 3.74%
27 2 1.87% 5.61% DATA ANALYSIS:
28 8 7.48% 13.08% Mean Speed: 33
29 5 4.67% 17.76% Standard Deviation: 4
30 10 9.35% 27.10% Standard error of the mean: 0.39
31 12 11.21% 38.32% 50th Percentile: 33
32 8 7.48% 45.79% 85th Percentile: 37
33 13 12.15% 57.94% 97th Percentile: 43
34 14 13.08% 71.03% 10 Mile Pace: 28 to 37
35 7 6.54% 77.57% % of Samples in 10-Mile Pace: 81.31%
36 7 6.54% 84.11% Comments:
37 3 2.80% 86.92%
38 4 3.74% 90.65%
39 0 0.00% 90.65%
40 4 3.74% 94.39%
41 2 1.87% 96.26%
42 0 0.00% 96.26%
43 4 3.74% 100.00%
44 0 0.00% 100.00%
45 0 0.00% 100.00%
46 0 0.00% 100.00%
47 0 0.00% 100.00%
48 0 0.00% 100.00%
49 0 0.00% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 107 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 30th Street East
Location: at Kettering St
Between: Avenue I to Lancaster Blvd Ref. # 259
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:35 To 3:00
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 42
29 0 0.00% 0.00% Standard Deviation: 4
30 2 1.16% 1.16% Standard error of the mean: 0.3
31 0 0.00% 1.16% 50th Percentile: 42
32 2 1.16% 2.33% 85th Percentile: 46
33 5 2.91% 5.23% 97th Percentile: 50
34 2 1.16% 6.40% 10 Mile Pace: 37 to 46
35 4 2.33% 8.72% % of Samples in 10-Mile Pace: 74.42%
36 7 4.07% 12.79% Comments:
37 11 6.40% 19.19%
38 6 3.49% 22.67%
39 9 5.23% 27.91%
40 7 4.07% 31.98%
41 10 5.81% 37.79%
42 23 13.37% 51.16%
43 18 10.47% 61.63%
44 16 9.30% 70.93%
45 12 6.98% 77.91%
46 16 9.30% 87.21%
47 8 4.65% 91.86%
48 2 1.16% 93.02%
49 5 2.91% 95.93%
50 4 2.33% 98.26%
51 3 1.74% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 172 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 30th Street East
Location: at Nugent St
Between: Lancaster Blvd to Avenue J Ref. # 260
Cumulative Date: 11/2/2021 Day: Tuesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:05 To 3:35
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 46
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.33
31 0 0.00% 0.00% 50th Percentile: 46
32 0 0.00% 0.00% 85th Percentile: 49
33 0 0.00% 0.00% 97th Percentile: 56
34 0 0.00% 0.00% 10 Mile Pace: 40 to 49
35 3 1.32% 1.32% % of Samples in 10-Mile Pace: 77.97%
36 6 2.64% 3.96% Comments:
37 2 0.88% 4.85%
38 2 0.88% 5.73%
39 4 1.76% 7.49%
40 8 3.52% 11.01%
41 14 6.17% 17.18%
42 23 10.13% 27.31%
43 12 5.29% 32.60%
44 16 7.05% 39.65%
45 12 5.29% 44.93%
46 29 12.78% 57.71%
47 19 8.37% 66.08%
48 24 10.57% 76.65%
49 20 8.81% 85.46%
50 6 2.64% 88.11%
51 11 4.85% 92.95%
52 2 0.88% 93.83%
53 2 0.88% 94.71%
54 2 0.88% 95.59%
55 2 0.88% 96.48%
56 2 0.88% 97.36%
57 2 0.88% 98.24%
58 0 0.00% 98.24%
59 2 0.88% 99.12%
60 1 0.44% 99.56%
61 1 0.44% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 227 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25
30 35Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 30th Street East
Location: at Ave J-4
Between: Avenue J to Avenue J-8 Ref. # 261
Cumulative Date: 11/3/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:00 To 9:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 49
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.38
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 54
33 0 0.00% 0.00% 97th Percentile: 57
34 0 0.00% 0.00% 10 Mile Pace: 45 to 54
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 66.10%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 4 2.26% 2.26%
39 1 0.56% 2.82%
40 8 4.52% 7.34%
41 1 0.56% 7.91%
42 9 5.08% 12.99%
43 8 4.52% 17.51%
44 5 2.82% 20.34%
45 7 3.95% 24.29%
46 16 9.04% 33.33%
47 7 3.95% 37.29%
48 15 8.47% 45.76%
49 9 5.08% 50.85%
50 10 5.65% 56.50%
51 11 6.21% 62.71%
52 20 11.30% 74.01%
53 10 5.65% 79.66%
54 12 6.78% 86.44%
55 5 2.82% 89.27%
56 12 6.78% 96.05%
57 2 1.13% 97.18%
58 0 0.00% 97.18%
59 1 0.56% 97.74%
60 2 1.13% 98.87%
61 0 0.00% 98.87%
62 1 0.56% 99.44%
63 1 0.56% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 177 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 30th Street East
Location: at San Miguel Dr
Between: Avenue J-8 to Avenue K Ref. # 262
Cumulative Date: 11/3/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 9:35 To 10:05
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 47
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.52
31 0 0.00% 0.00% 50th Percentile: 46
32 0 0.00% 0.00% 85th Percentile: 53
33 0 0.00% 0.00% 97th Percentile: 59
34 0 0.00% 0.00% 10 Mile Pace: 41 to 50
35 5 3.79% 3.79% % of Samples in 10-Mile Pace: 65.15%
36 0 0.00% 3.79% Comments:
37 5 3.79% 7.58%
38 0 0.00% 7.58%
39 5 3.79% 11.36%
40 0 0.00% 11.36%
41 11 8.33% 19.70%
42 4 3.03% 22.73%
43 8 6.06% 28.79%
44 7 5.30% 34.09%
45 15 11.36% 45.45%
46 6 4.55% 50.00%
47 9 6.82% 56.82%
48 8 6.06% 62.88%
49 8 6.06% 68.94%
50 10 7.58% 76.52%
51 8 6.06% 82.58%
52 1 0.76% 83.33%
53 6 4.55% 87.88%
54 8 6.06% 93.94%
55 0 0.00% 93.94%
56 3 2.27% 96.21%
57 0 0.00% 96.21%
58 0 0.00% 96.21%
59 4 3.03% 99.24%
60 1 0.76% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 132 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 30th Street East
Location: at Ave K-4
Between: Avenue K to Avenue K-8 Ref. # 263
Cumulative Date: 11/3/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:15 To 10:45
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 52
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.49
31 0 0.00% 0.00% 50th Percentile: 52
32 0 0.00% 0.00% 85th Percentile: 58
33 0 0.00% 0.00% 97th Percentile: 65
34 0 0.00% 0.00% 10 Mile Pace: 43 to 52
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 55.70%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 3 2.01% 2.01%
40 3 2.01% 4.03%
41 0 0.00% 4.03%
42 3 2.01% 6.04%
43 6 4.03% 10.07%
44 3 2.01% 12.08%
45 5 3.36% 15.44%
46 8 5.37% 20.81%
47 12 8.05% 28.86%
48 7 4.70% 33.56%
49 12 8.05% 41.61%
50 3 2.01% 43.62%
51 6 4.03% 47.65%
52 21 14.09% 61.74%
53 2 1.34% 63.09%
54 0 0.00% 63.09%
55 10 6.71% 69.80%
56 3 2.01% 71.81%
57 11 7.38% 79.19%
58 9 6.04% 85.23%
59 5 3.36% 88.59%
60 6 4.03% 92.62%
61 3 2.01% 94.63%
62 3 2.01% 96.64%
63 0 0.00% 96.64%
64 0 0.00% 96.64%
65 2 1.34% 97.99%
66 1 0.67% 98.66%
67 0 0.00% 98.66%
68 1 0.67% 99.33%
69 0 0.00% 99.33%
70 1 0.67% 100.00%
Total: 149 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 30th Street East
Location: 1000' n/o Ave L
Between: Avenue K-8 to Avenue L Ref. # 264
Cumulative Date: 11/3/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 10:55 To 11:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 55
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 54
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.41
31 0 0.00% 0.00% 50th Percentile: 54
32 0 0.00% 0.00% 85th Percentile: 59
33 0 0.00% 0.00% 97th Percentile: 62
34 0 0.00% 0.00% 10 Mile Pace: 50 to 59
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 70.55%
36 0 0.00% 0.00% Comments:
37 0 0.00% 0.00%
38 0 0.00% 0.00%
39 3 2.05% 2.05%
40 3 2.05% 4.11%
41 0 0.00% 4.11%
42 0 0.00% 4.11%
43 0 0.00% 4.11%
44 0 0.00% 4.11%
45 0 0.00% 4.11%
46 9 6.16% 10.27%
47 3 2.05% 12.33%
48 3 2.05% 14.38%
49 3 2.05% 16.44%
50 6 4.11% 20.55%
51 9 6.16% 26.71%
52 9 6.16% 32.88%
53 21 14.38% 47.26%
54 9 6.16% 53.42%
55 13 8.90% 62.33%
56 15 10.27% 72.60%
57 3 2.05% 74.66%
58 9 6.16% 80.82%
59 9 6.16% 86.99%
60 6 4.11% 91.10%
61 3 2.05% 93.15%
62 6 4.11% 97.26%
63 1 0.68% 97.95%
64 1 0.68% 98.63%
65 0 0.00% 98.63%
66 0 0.00% 98.63%
67 0 0.00% 98.63%
68 1 0.68% 99.32%
69 0 0.00% 99.32%
70 1 0.68% 100.00%
Total: 146 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street East
Location: 300' n/o Ave I
Between: Avenue H-8 to Avenue I Ref. # 265
Cumulative Date: 11/3/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 1:50 To 2:30
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 3 2.75% 2.75%
27 12 11.01% 13.76% DATA ANALYSIS:
28 12 11.01% 24.77% Mean Speed: 32
29 21 19.27% 44.04% Standard Deviation: 5
30 9 8.26% 52.29% Standard error of the mean: 0.48
31 0 0.00% 52.29% 50th Percentile: 30
32 17 15.60% 67.89% 85th Percentile: 34
33 11 10.09% 77.98% 97th Percentile: 47
34 9 8.26% 86.24% 10 Mile Pace: 25 to 34
35 0 0.00% 86.24% % of Samples in 10-Mile Pace: 86.24%
36 0 0.00% 86.24% Comments:
37 0 0.00% 86.24%
38 0 0.00% 86.24%
39 3 2.75% 88.99%
40 0 0.00% 88.99%
41 6 5.50% 94.50%
42 0 0.00% 94.50%
43 0 0.00% 94.50%
44 0 0.00% 94.50%
45 0 0.00% 94.50%
46 0 0.00% 94.50%
47 3 2.75% 97.25%
48 0 0.00% 97.25%
49 0 0.00% 97.25%
50 3 2.75% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 109 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street East
Location: 1000 feet south of Avenue J-8
Between: Avenue J-8 to Avenue K Ref. # 266
Cumulative Date: 11/3 &12/1/21 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 2:40/2:00 To 3:10/2:30
21 0 0.00% 0.00% Recorder: DA/AY
22 0 0.00% 0.00% Posted Speed: 40
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 40
29 0 0.00% 0.00% Standard Deviation: 4
30 1 0.92% 0.92% Standard error of the mean: 0.38
31 1 0.92% 1.83% 50th Percentile: 39
32 0 0.00% 1.83% 85th Percentile: 45
33 2 1.83% 3.67% 97th Percentile: 48
34 3 2.75% 6.42% 10 Mile Pace: 36 to 45
35 4 3.67% 10.09% % of Samples in 10-Mile Pace: 78.90%
36 14 12.84% 22.94% Comments:
37 8 7.34% 30.28%
38 9 8.26% 38.53%
39 13 11.93% 50.46%
40 8 7.34% 57.80%
41 11 10.09% 67.89%
42 8 7.34% 75.23%
43 4 3.67% 78.90%
44 1 0.92% 79.82%
45 10 9.17% 88.99%
46 4 3.67% 92.66%
47 1 0.92% 93.58%
48 5 4.59% 98.17%
49 2 1.83% 100.00%
50 0 0.00% 100.00%
51 0 0.00% 100.00%
52 0 0.00% 100.00%
53 0 0.00% 100.00%
54 0 0.00% 100.00%
55 0 0.00% 100.00%
56 0 0.00% 100.00%
57 0 0.00% 100.00%
58 0 0.00% 100.00%
59 0 0.00% 100.00%
60 0 0.00% 100.00%
61 0 0.00% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 109 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12 14
16Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street East
Location: at Ave K-4
Between: Avenue K to Avenue K-8 Ref. # 267
Cumulative Date: 11/3/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 3:15 To 3:45
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 48
29 0 0.00% 0.00% Standard Deviation: 7
30 1 1.32% 1.32% Standard error of the mean: 0.8
31 0 0.00% 1.32% 50th Percentile: 48
32 1 1.32% 2.63% 85th Percentile: 55
33 1 1.32% 3.95% 97th Percentile: 60
34 0 0.00% 3.95% 10 Mile Pace: 46 to 55
35 0 0.00% 3.95% % of Samples in 10-Mile Pace: 56.58%
36 3 3.95% 7.89% Comments:
37 2 2.63% 10.53%
38 0 0.00% 10.53%
39 1 1.32% 11.84%
40 3 3.95% 15.79%
41 0 0.00% 15.79%
42 4 5.26% 21.05%
43 1 1.32% 22.37%
44 3 3.95% 26.32%
45 5 6.58% 32.89%
46 5 6.58% 39.47%
47 7 9.21% 48.68%
48 5 6.58% 55.26%
49 5 6.58% 61.84%
50 3 3.95% 65.79%
51 2 2.63% 68.42%
52 4 5.26% 73.68%
53 3 3.95% 77.63%
54 2 2.63% 80.26%
55 7 9.21% 89.47%
56 1 1.32% 90.79%
57 0 0.00% 90.79%
58 2 2.63% 93.42%
59 2 2.63% 96.05%
60 1 1.32% 97.37%
61 2 2.63% 100.00%
62 0 0.00% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 76 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 1
2 3
4 5
6 7
8Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 35th Street East
Location: at James Ct
Between: Avenue K-8 to Avenue L Ref. # 268
Cumulative Date: 11/3/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 11:40 To 12:40
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 48
29 0 0.00% 0.00% Standard Deviation: 6
30 0 0.00% 0.00% Standard error of the mean: 0.72
31 0 0.00% 0.00% 50th Percentile: 49
32 0 0.00% 0.00% 85th Percentile: 53
33 0 0.00% 0.00% 97th Percentile: 58
34 0 0.00% 0.00% 10 Mile Pace: 45 to 54
35 0 0.00% 0.00% % of Samples in 10-Mile Pace: 65.71%
36 2 2.86% 2.86% Comments:
37 2 2.86% 5.71%
38 2 2.86% 8.57%
39 2 2.86% 11.43%
40 2 2.86% 14.29%
41 5 7.14% 21.43%
42 0 0.00% 21.43%
43 0 0.00% 21.43%
44 0 0.00% 21.43%
45 4 5.71% 27.14%
46 7 10.00% 37.14%
47 1 1.43% 38.57%
48 2 2.86% 41.43%
49 10 14.29% 55.71%
50 7 10.00% 65.71%
51 8 11.43% 77.14%
52 4 5.71% 82.86%
53 2 2.86% 85.71%
54 1 1.43% 87.14%
55 2 2.86% 90.00%
56 2 2.86% 92.86%
57 2 2.86% 95.71%
58 1 1.43% 97.14%
59 0 0.00% 97.14%
60 0 0.00% 97.14%
61 0 0.00% 97.14%
62 2 2.86% 100.00%
63 0 0.00% 100.00%
64 0 0.00% 100.00%
65 0 0.00% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 70 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 2
4 6
8 10
12Frequency
Spot Speed, mph
Frequency Distribution
CITY OF LANCASTER - PUBLIC WORKS DEPT./TRAFFIC DIV. SPOT SPEED STUDY Street: 40th Street East
Location: 1000 s/o Lancaster Blvd
Between: Lancaster Blvd to Avenue J Ref. # 269
Cumulative Date: 11/3/2021 Day: Wednesday
Speed Frequency Percent Percent Weather: Clear
20 0 0.00% 0.00% Hours: 12:50 To 1:20
21 0 0.00% 0.00% Recorder: DA
22 0 0.00% 0.00% Posted Speed: 50
23 0 0.00% 0.00% Remarks:
24 0 0.00% 0.00%
25 0 0.00% 0.00%
26 0 0.00% 0.00%
27 0 0.00% 0.00% DATA ANALYSIS:
28 0 0.00% 0.00% Mean Speed: 47
29 0 0.00% 0.00% Standard Deviation: 5
30 0 0.00% 0.00% Standard error of the mean: 0.36
31 1 0.51% 0.51% 50th Percentile: 47
32 0 0.00% 0.51% 85th Percentile: 52
33 0 0.00% 0.51% 97th Percentile: 59
34 0 0.00% 0.51% 10 Mile Pace: 41 to 50
35 0 0.00% 0.51% % of Samples in 10-Mile Pace: 67.86%
36 0 0.00% 0.51% Comments:
37 0 0.00% 0.51%
38 4 2.04% 2.55%
39 10 5.10% 7.65%
40 4 2.04% 9.69%
41 12 6.12% 15.82%
42 22 11.22% 27.04%
43 10 5.10% 32.14%
44 8 4.08% 36.22%
45 10 5.10% 41.33%
46 14 7.14% 48.47%
47 10 5.10% 53.57%
48 17 8.67% 62.24%
49 18 9.18% 71.43%
50 12 6.12% 77.55%
51 8 4.08% 81.63%
52 12 6.12% 87.76%
53 4 2.04% 89.80%
54 4 2.04% 91.84%
55 2 1.02% 92.86%
56 8 4.08% 96.94%
57 0 0.00% 96.94%
58 0 0.00% 96.94%
59 3 1.53% 98.47%
60 0 0.00% 98.47%
61 0 0.00% 98.47%
62 1 0.51% 98.98%
63 1 0.51% 99.49%
64 0 0.00% 99.49%
65 1 0.51% 100.00%
66 0 0.00% 100.00%
67 0 0.00% 100.00%
68 0 0.00% 100.00%
69 0 0.00% 100.00%
70 0 0.00% 100.00%
Total: 196 100%
spd_form.xls
0%
20%
40%
60%
80%
100%
120%Cumulative Frequency
Spot Speed, mph
Cumulative Frequency Distribution
0 5
10 15
20 25Frequency
Spot Speed, mph
Frequency Distribution

← All documents from this meeting