- 1 -
Maintenance Services Agreement; December 2018

AGREEMENT FOR MAINTENANCE SERVICES

THIS AGREEMENT FOR MAINTENAN CE SERVICES is made and entered into this 14th day of December, 2023 by and between the CITY OF LANCASTER, a municipal corporation and charter city, (“City”), and BEST CONTRACTI NG SERVICES, INC., a California Corporation (“Contractor”) ( collectively, sometimes referred to hereinafter as the “Parties”).

RECITALS

WHEREAS, the City desires to engage Contract or to perform certain services, as provided herein, identified as:

2023 Roofing Improvements – City Of Lancaster AT Building (THE “SERVICES”)

WHEREAS, the principal members of Contractor are qualified and duly registered/licensed under the laws of the State of California, and Contractor desires to accept such engagement;

NOW, THEREFORE, the parties agree as follows:

1. Parties to the Agreement.

The parties to this Agreement are:

A. CITY: CITY OF LANCASTER

B. CONTRACTOR: BEST CONTRACTING SERVICES, INC.

2. Notices. All written notices required by or related to this Agreement shall be sent by Certified Mail, Return Receipt Requested, postage prepaid and addressed as listed below. Neither party to this Agreement shall refuse to accept such mail; parties to this Agreement shall promptly inform the other party of any changes of address. All notices required by this Agreement are effective on the day of receipt, unless otherwise indicated herein.

CITY City of Lancaster
Attn: Jason Caudle, City Manager
44933 North Fern Avenue
Lancaster, California 93534

CONTRACTOR BEST CONTRACTING SERVICES, INC.

Attn: Kayhan Fatemi, Executive Vice President
19027 S. Hamilton Avenue
Gardena, CA 90248

3. Successors and Assigns. The terms hereof shall be binding upon and inure to the benefit of the successors and assigns of the parties hereto; provi ded, however, that no pa rty hereto shall assign any of the benefits and burdens hereunder, whether voluntarily or by operation of law, without prior written consent of the other party, and any such assignments without said consent shall be void. - 2 -
Maintenance Services Agreement; December 2018

4. Description of Work. The City hereby engages Contractor, and Contractor accepts such engagement, to perform the technical and professional services set forth in the “Scope Of Work", attached hereto as Exhibit “A” and incorporated herein by reference. Contractor shall perform and complete, in a manner satisfactory to the City, all work and servic es set forth in Exhibit “A.” The City Manager or his designee shall have the right to review and inspect the work during the course of its performance at such times as may be specified by the City Manager, or his designee.

5. Obligations of the City.

A. The City shall pay Contractor an amount not to exceed $228,966.62 for all work necessary to complete the Services, as described in the Payment Schedule. Payments shall be due within thirty (30) days following submittal of an invoice detailing the services performed, as set forth in Exhibit “B”.

B. No payment made hereunder by the City to Contractor, other than the final payment, shall be construed as an acceptance by the City of any work or materials, nor as evidence of satisfactory performance by Contractor of its obligations under this Agreement.

6. Obligations of the Contractor.

A. Contractor shall perform as required by th is Agreement and in accordance with the Scope Of Work set forth in Exhibit A.

B. Contractor shall be responsible for payment of all employees’ wages and benefits, and shall comply with all require ments pertaining to employer’s lia bility, workers’ compensation, unemployment insurance, and Social Security.

C. Contractor shall not subcontract any of the work required to perform the Services without the express prior written approval of the City.

7. Hold Harmless and Indemnification. Contractor agrees to indemnify and hold harmless the City, its elected officials, officers and employ ees, from and against any a nd all third party claims, losses, obligations, or liabilities whatsoever, including reasonable attorney’s fees, incurred to the extent arising out of or related to Contractor’s negligent or willful wrongful acts, errors or omissions, or those of its employees or agents. Contractor agrees to defend the City, its officers and employees, using counsel of the City’s choosing, from and against any and all cl aims covered by the inde mnity in the preceding sentence.

8. Amendments. Any amendment, modifi cation, or variation fro m the terms of this Agreement shall be in writing and sh all be effective only upon mutual written a pproval by the City and Contractor.

9. Non-Discrimination and Equal Employment Opportunity.

A. In the performance of this Agreement, Contractor shall not discriminate against any employee, subcontractor, or applicant for employment because of race, color, religi on, ancestry, sex, national origin, physical or mental disability or age. Contractor will take affirmativ e action to ensure - 3 -
Maintenance Services Agreement; December 2018

that subcontractors and applicants are employed, and that employees are treated during employment without regard to their race, color, religion, ancestry, sex, national origin, physical or mental disability or age. Affirmative action relating to employment shal l include, but not be limited to the following:
employment, upgrading, demotion or tr ansfer; recruitment; layoff or ter mination; rates of pay or other forms of compensation; and selection for training including apprenticeship.

B. The provisions of subsection A above sha ll be included in all solicitations or advertisements placed by or on behalf of Contractor for personnel to perform any services under this Agreement. The City shall have access to all docum ents, data and records of Contractor and its subcontractors for purposes of determining compliance with the equal employment opportunity and non- discrimination provisions of this Section.

10. Term; Effective Date. This Agreement shall become effective and shall be in full force and effect upon the execution of the Agreement by the City and the Contractor. This Agreement shall continue in full force and effect for Twelve (12) months, unless the Agreement is sooner terminated in accordance with this Agreement; provided, however, that the City and the Contractor may mutually agree in writing to extend the Term of this Agreement.

11. Termination.

A. For Convenience. The City may terminate this Agreement at any time without cause by giving thirty (30) days written notice to the other party of such termination and specifying the effective date thereof. In the event of termination of this Ag reement, Contractor will be paid for work completed through the date of termination within thirty (30) days following submittal of a final invoice.

B. For Cause. If Contractor fails to perform the services called for by this Agreement or so fails to make progress as to endanger perform ance of this Agreement in accordance with its terms, Contractor shall correct such failure within ten (10) days (or such longer period that the City may authorize in writing) after receipt of notice from the City specifying such failure. Should the failure not be corrected within this time period, the C ity may immediately terminate the Agreement by written notice to Contractor.

C. In the event of termination, whether for convenience or cause , reports, plans, studies and other documents (collect ively, “documents”) related to the Services shall become the City’s property. Contractor shall provide all documents to the City that have not yet been within ten (10) calendar days after termination of the Agreement.

12. Independent Contractor. Contractor is an independent Contractor and shall have no power or authority to incur any debt, obligation or liability on behalf of the City. It is expressly understood between the Parties to this Agreement that no employee/employer relationship is intended.

13. Insurance.

A. The Contractor, at its expense, shall mainta in in effect at all times during the term of this Agreement the following coverage and limits of insurance, which shall be maintained with insurers listed “A-, VIII” or better in the Best’s Key Rating Guide:
- 4 -
Maintenance Services Agreement; December 2018

Commercial General Liability
Each Occurrence $5,000,000
Per Project General Aggregate $10,000,000
Including Products/Completed Operations; Contractual Liability/Independent Contractors; Property Damage
(Coverage shall be at le ast as broad as ISO form CG2010 11/85 or CG2010 07/04 and CG2037 07/04 combined, or an equivalent providing ongoing and completed operations)

Commercial Automobile Liability
Combined Single Limit per Accident for

Bodily Injury and Property Damage $10,000,000
(Coverage shall be at least as broad as ISO form CA00 01) Workers Compensation
As Required by the State of California

Statutory Limits
Employers’ Liability
Each Accident

$1,000,000
Bodily Injury by Disease $1,000,000
Each Employee $1,000,000
(A Waiver of Subrogation must be provided on behalf of the Certificate Holder for the Workers Compensation & Employers’ Liability policies)

B. The Contractor’s insurance shall apply se parately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insured’s liability.

C. Any deductibles or self-insurance retentions must be declared and approved by the City. At the City’s option, either the insurer sh all reduce or eliminate such deductibles or self-insured retentions as respects the City insured entitie s or the insurer shall proc ure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.

D. All insurance shall be primary and non-cont ributory as respects the City insured entities. Any insurance or self-insurance maintained by the City insured entities shall be in excess of the Contractor’s insurance and shall not contribute with it.

E. Contractor shall furnish the City with Cer tificates of Insurance and with original endorsements effecting coverage requi red by this Agreement. Certificates of Insurance shall meet the following requirements:

(1) Show that the insurance policy has been endorsed to state that coverage shall not be suspended, voided, cancelle d, reduced in coverage or in limits except after 30 days’ prior written notice (10 days’ written notice for non-payment) to the City of Lancaster.

(2) List in the “Descriptions of Operations/Locations/Vehicles” section:
“2023 Roofing Improvements – City Of Lancaster AT Building” - 5 -
Maintenance Services Agreement; December 2018

The City of Lancaster, its elected official s, officers, employees and volunteers are included as additional covered parties, but only insofar as the operations under this contract are concerned.”

(3) List in the “Certificate Holder” section:

The City of Lancaster, 44933 Fern Avenue, Lancaster, California 93534.

14. Ownership of Documents . All plans, specifications, re ports, studies, maps and other documents prepared or obtained by C ontractor in the course of performing the work and are required by this Agreement to be delivered to the City shall be the property of the City. Basic sketches, charts, computations and similar data prepared or obtai ned by Contractor under this Agreement shall, upon request, be made available to City without restriction or limitation on their use.

15. Data Provided to Contractor. City shall provide to Contractor, without charge, all data, including reports, records, maps and other information, now in the City’s possession which may facilitate the timely performance of the work described in Exhibit A.

16. Contractor’s Warranties and Representations.

Contractor warrants and represents to City as follows:

A. Contractor has not employed or retained any person or entity, other than a bona fide employee working exclusively for Contractor, to solicit or obtain this Agreement.

B. Contractor has not paid or agreed to pay any person or entity, other than a bona fide employee working exclusively for Contractor, any fee, commission, percentage, gift, or any other consideration contingent upon or re sulting from the execution of this Agreement. Upon any breach or violation of this warranty, City shall have the right, in its sole discretion, to terminate this Agreement without further liability, or, in the alternative, to deduct from any sums payable hereunder the full amount or value of any such fee, commission, percentage or gift.

C. Contractor has no knowledge that any officer or employee of the City has any interest, whether contractual, noncontractual, financial, proprietary, or otherwise, in this transaction or in the business of the Contractor, and that if any such interest comes to the knowledge of Contractor at any time, a complete written disclosure of such interest wi ll be made to City, even if such interest would not be deemed a prohibited “conflict of interest” under applicable laws.

D. Upon the execution of this Agreement, Contractor has no interest, direct or indirect, in any transaction or business entity which would conflict with or in any manner hinder the performance of services and work required by this Agreement, nor shall any such interest be acquired during the term of this Agreement.

- 6 -
Maintenance Services Agreement; December 2018

17. Resolution of Disputes.

A. Disputes regarding the interpretation or application of any provisions of this Agreement shall, to the extent r easonably feasible, be resolved through good faith negotiations between the parties.

B. If the parties cannot resolve the dispute through good faith negotiations, either party may give Notice of Dispute to the other party. The Noti ce of Dispute shall state the nature of the dispute and the corrective action necessary to remedy the dispute.

After Notice of Dispute, the parties sha ll first attempt to resolve any disputes by mediation. The parties sha ll agree on a single mediator . Mediation shall be conducted in Lancaster, California. Each party shall pay its own attorneys’ fees an d the costs of mediation shall be split equally between the parties.

If the dispute has not been resolved by me diation within 45 days after Notice of Dispute, or the parties are unable to agree to a mediator, within 15 days after Notice of Dispute, then, the dispute may, upon agreement of the parties be resolved by binding arbitration.

C. If any action at law or in equity is brought to enforce or interpret any provisions of this Agreement, the prevailing party in such action shall be entitled to reasonable attorney’s fees, cost and necessary disbursements, in addition to such other relief as may be sought and awarded.

18. Exhibits.

The following exhibits to which reference is made in this Agreement are deemed incorporated herein in their entirety:

Exhibit “A” Scope Of Work

19. Governing Law.

This Agreement shall be governed by the laws of the State of California.

[Signatures begin on following page]
- 7 -
Maintenance Services Agreement; December 2018

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by their respective officers thereunto duly authorized.

CITY OF LANCASTER

LANCASTER, CALIFORNIA

By:

Jason Caudle, City Manager

Contractor: BEST CONTRACTING SERVICES, INC.

By:

Kayhan Fatemi, Executive Vice President

ATTEST:

Andrea Alexander, City Clerk

APPROVED AS TO FORM:

Allison E. Burns Esq., City Attorney

CONTRACT SUBMISSION APPROVAL:

__________________________________________
Marissa Diaz, Director – Public Works
Insurance Approved
City of Lancaster Date of Issue (10/2023)
AT Building
075416 - Page 1 of 24

KETONE ETHYLENE ESTER (KEE) ROOFING
SECTION 075416 - KETONE ETHYLENE ESTER (KEE) ROOFING
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Removal of existing roof and wall systems down to decking.

2. Mechanically-fastened thermoplastic KEE roofing system on wood deck, including:

3. Roof insulation.

4. Roof insulation cover board.

5. New Coping & New Wood Nailer

6. Walkway material.

B. Unit Prices: Wood deck repair; per 4x8 sheet of plywood installed .

1.2 DEFINITIONS
A. Roofing Terminology: Refer to ASTM D1079 "Standard Terminology Relating to Roofing and Waterproofing" and glossary in applicable edition of NRCA's "The NRCA Roofing Manual:

Membrane Roof Systems" for definition of terms related to roofing work in this Section.

1.3 PREINSTALLATION MEETINGS
A. Preinstallation Roofing Conference: Conduct conference at Project site.

1. Meet with Owner, Owner's Consultant, Owner's insurer if applicable, testing and inspecting agency representative, roofing Installer, roofing system manufacturer' s representative, and installers whose work interfaces with or affects roofing, including in
stallers of roof accessories and roof-mounted equipment.

2. Review drawings and specifications.

3. Review methods and procedures related to roofing installation, including manufacturer's written instructions.

4. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

5. Examine substrate conditions and finishes for compliance with requirements, including flatness and fastening.

Exhibit A
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 2 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING

6. Review structural loading limitations of roof deck during and after roofing. 7. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that will affect roofing system. 8. Review governing regulations and requirements for insurance and certificates if applicable. 9. Review temporary protection requirements for roofing system during and after installation. 10. Review roof observation and repair procedures after roofing installation. 1.4 ACTION SUBMITTALS A. Product Data: For each type of product indicated. B. Wind Uplift Resistance Submittal: For roofing system, indicating compliance with wind uplift performance requirements. 1.5 INFORMATIONAL SUBMITTALS A. Contractor's Product Certificate: Submit certificate, indicating products intended for Work of this Section, including product names and numbers and manufacturers' names, with statement indicating that products to be provided meet the requirements of the Contract Documents. B. Manufacturer Certificates: Signed by roofing manufacturer certifying that roofing system complies with requirements specified in "Performance Requirements" Article. 1. Submit evidence of compliance with performance requirements. a. Include: UL listing certificate. 2. Product Compatibility: Indicate manufacturer has verified compatibility of roofing system components, including but not limited to: Roofing membrane, flashing sheets, adhesives, and sealants. C. Warranties: Unexecuted sample copies of special warranties. 1.6 CLOSEOUT SUBMITTALS A. Executed copies of warranties. B. Maintenance Data: To include in maintenance manuals. 1.7 QUALITY ASSURANCE A. Installer Qualifications: An employer of workers trained and certified by manufacturer, including a full-time on-site supervisor with a minimum of five years' experience installing products comparable to those specified, able to communicate verbally with Contractor, Owner's City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 3 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING Consultant, and employees, and qualified by the manufacturer to install manufacturer's product and furnish warranty of type specified. B. Manufacturer Qualifications: Approved manufacturer listed in this Section, UL listed for roofing systems comparable to that specified for this Project, with minimum five years' experience in manufacture of thermoplastic roof membrane products in successful use in similar applications. C. Roofing Inspector Qualifications: A technical representative of manufacturer and experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality Control Article, to determine Installer's compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be one of the following: 1. An authorized full-time technical employee of the manufacturer. D. Manufacturer's Installation Instructions: Obtain and maintain on-site access to manufacturer's written recommendations and instructions for installation of products. 1.8 DELIVERY, STORAGE, AND HANDLING A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components. B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight. 1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life. C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation. D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck. 1.9 PROJECT / FIELD CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements. B. Daily Protection: Coordinate installation of roofing so insulation and other components of roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.

City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 4 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING

1. Provide tie-offs at end of each day's work to cover exposed roofing and insulation with a course of roofing sheet securely in place with joints and edges sealed. 2. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing. 3. Remove temporary plugs from roof drains at end of each day. 4. Remove and discard temporary seals before beginning work on adjoining roofing. 1.10 WARRANTY A. Manufacturer's Warranty: Roof System Manufacturer's standard form in which Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within warranty period, as follows. 1. Form of Warranty: Manufacturer's standard warranty form. 2. Scope of Warranty: Work of this Section and including sheet metal details and termination details installed by the roof system Installer and approved by the Roof System Manufacturer. 3. Warranty Period: 20 years from date of completion. B. Manufacturer Inspection Services: By manufacturer's technical representative, to report maintenance responsibilities to Owner necessary for preservation of Owner's warranty rights. The cost of manufacturer's inspections is included in the Contract Sum. 1. Inspections to occur in following years: 2, 5, 10, 15 following completion. C. Installer Warranty: Installer's warranty signed by Installer, as follows. 1. Form of Warranty: Form acceptable to Roofing Manufacturer and Owner. 2. Scope of Warranty: Work of this Section. 3. Warranty Period: 2 years from date of completion. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Basis of Design: The roof system specified in this Section is based upon products of Tremco CPG Inc, Beachwood, OH, (800) 562-2728, www.tremcoroofing.com that are named in other Part 2 articles. Provide specified products. 2.2 PERFORMANCE REQUIREMENTS A. General Performance: Installed membrane roofing and base flashings shall withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 5 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING defective manufacture, fabrication, installation, or other defects in construction. Membrane roofing and base flashings shall remain watertight. 1. Accelerated Weathering: Roofing system shall withstand 10,000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155. B. Flashings and Fastening: Provide base flashings, perimeter flashings, detail flashings and component materials and installation techniques that comply with requirements and recommendations of the following: 1. FM Global 1-49: Loss Prevention Data Sheet for Perimeter Flashings. 2. FM Global 1-29: Loss Prevention Data Sheet for Above Deck Roof Components. 3. NRCA Roofing Manual (Sixth Edition) for construction details and recommendations. 4. SMACNA Architectural Sheet Metal Manual (Seventh Edition) for construction details. C. Exterior Fire-Test Exposure: ASTM E108, Class A; for application and roof slopes indicated, as determined by testing identical membrane roofing materials by a qualified testing agency. Materials shall be identified with appropriate markings of applicable testing agency. 2.3 MATERIALS, GENERAL A. Material Compatibility: Roofing materials shall be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roof membrane manufacturer based on testing and field experience. 2.4 THERMOPLASTIC MEMBRANE MATERIALS A. KEE Roof Membrane: 1. Thermoplastic Ketone Ethylene Ester (KEE) coated polyester fabric-reinforced sheet, ASTM D6754. a. Basis of design product: Tremco, TremPly KEE Single Ply Roof Membrane. b. Breaking Strength, minimum, ASTM D751: Machine direction, 500 lbf (87 kN/m); Cross machine direction, 400 lbf (70 kN/m). c. Tear Strength, minimum, ASTM D751: Machine direction,125 lbf (21 kN/m); Cross machine direction, 145 lbf (25 kN/m). d. Elongation at Break, ASTM D751: 20 percent. e. Dynamic Impact/Puncture Resistance, ASTM D5635: Pass. f. Minimum Membrane Thickness, nominal, less backing, ASTM D751: 45 mils g. Thickness over fiber, optical method: 0.014 inches.

City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 6 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING h. Accelerated Weathering, ASTM G155 and ASTM G154: Not greater than 5,000 hr., no cracking or crazing. i. Abrasion Resistance, ASTM D3389: Not greater than 2,000 cycles, H-18 wheel, 1,000 g load. j. Color: White. k. Solar Reflectance Index (SRI), ASTM E1980: 110 (White, initial), 86 (White, 3-yr aged). B. Sheet Flashing: Manufacturer's standard, smooth-backed, sheet flashing of same material, type, reinforcement, thickness and color as KEE roof membrane. 2.5 AUXILIARY ROOFING MATERIALS A. General: Auxiliary membrane roofing materials recommended by roofing system manufacturer for intended use, and compatible with membrane roofing. 1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction. 2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the testing and product requirements of the California Department of Public Health's (formerly, the California Department of Health Services') "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers." B. Flashing Membrane Adhesive: 1. Bonding adhesive, solvent based fast drying, VOC-compliant, for bonding KEE smooth-backed single ply membranes and flashings to substrates. a. Basis of design product: Tremco, TremPly KEE LV Bonding Adhesive. b. VOC, maximum, ASTM D 3960: 200 g/L. C. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum bars, approximately 1 by 1/8 inch (25 mm by 3 mm) thick; with anchors. D. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening components to substrate, and acceptable to membrane roofing system manufacturer. E. Prefabricated Pipe Flashings: As recommended by roof membrane manufacturer. F. Gutters & Downspouts: 1. Use 24ga Galvanized; soldiered joints or equitant Extruded Aluminum. 2. Color and style to be selected by Owner from standard color charts City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 7 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING A. Edge metal: TPA Coated Clad Metal for edge metal and other flashing connections where the membrane is attached directly to the metal. 1. 24 gauge (min) galvanized G90 and pre-coated with TPA membrane attached at the fac-tory. 2. Minimum Face 3” B. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T-joint covers, lap sealants, termination reglets, and other accessories. 2.6 ROOF INSULATION MATERIALS A. General: Preformed roof insulation boards manufactured or approved by roofing manufacturer, selected from insulation manufacturer's standard sizes, suitable for application, and of thicknesses indicated. 1. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated, not less than two times the roof slope. B. Roof Insulation: Provide roof insulation product in thicknesses indicated in Part 3 as follows: 1. Board Insulation, Polyisocyanurate: CFC- and HCFC- free, with recycled content glass-fiber mat facer on both major surfaces, ASTM C1289 Type II Class 1. a. Basis of design product: Tremco, Trisotech Insulation. b. Compressive Strength, ASTM D1621: Grade 2: 20 psi (138 kPa). c. Conditioned Thermal Resistance at 75 deg. F (24 deg. C): 14.4 at 2.5 inches (50.8 mm) thick. d. Thickness: R10 2.7 ROOF INSULATION ACCESSORIES A. Cover Board: 1. Gypsum panel, glass-mat-faced, primed, ASTM C1177/C1177M. a. Basis of design product: Tremco/GP Gypsum DensDeck b. Thickness: 1/4 inch B. Insulation Cant Strips: ASTM C 208, Type II, Grade 1, cellulosic-fiber insulation board. C. Tapered Edge Strips: ASTM C 208, Type II, Grade 1, cellulosic-fiber insulation board.

City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 8 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING D. Insulation Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening roof insulation and cover boards to substrate, and acceptable to roofing system manufacturer. 2.8 METAL COPINGS A. Metal Coping, Basis of design product: Tremco Flat Stock 1. Coping system, 24 gauge Kynar 500 (70% minimum) finished. Continuous cleats on outside, fasteners with EPDM washers, fasten on inside face. Provide tight fitting cover plates at all joints. No fastener shall penetrate the top of the coping cap. COPING MUST SLOPE INWARD TO ROOF, unless otherwise directed by owner. 2. Coping system must be included in warranty coverage and meet all F.M. wind uplift requirements. 2.9 WALKWAY MATERIALS A. Walkway / Protection Mat Material: 1. Walkway roll, reinforced PVC/TPA membrane roll with serrated slip-resistant surface, fabricated for heat welding to compatible PVC/TPA membrane surface. a. Basis of design product: Tremco, TPA Walkway Roll. b. Roll Size: 36 inches by 60 foot (914 mm by 18.3 m). c. Thickness / Color: Gray, 0.072 inch (2 mm). d. Tensile, Grab ASTM D751: 200 lbf (890 N). e. Tear Strength, Tongue : 45 lbf (200N). f. Low Temp Flex: -40 deg F. (-40 deg C.). PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, for compliance with the following requirements and other conditions affecting performance of roofing system: 1. Verify that roof openings and penetrations are in place and curbs are set and braced and that roof drain bodies are securely clamped in place. 2. Existing Prepared Roof Substrate: Verify that existing insulation and substrate is sound and dry. Refer to requirements of Division 07 Section "Preparation for Re-Roofing." City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 9 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING

3. Wood Roof Deck: Verify that deck is sound and dry and securely fastened with no projecting fasteners and with no adjacent units in excess of 1/16 inch (1.6 mm) out of plane relative to adjoining deck. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections. B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast. C. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing. 3.3 INSTALLATION, GENERAL A. Install roofing system in accordance with manufacturer’s written instructions and approved details. B. Install wood cants, blocking, curbs, and nailers in accordance with requirements of Division 06 Section "Miscellaneous Rough Carpentry." C. NRCA Installation Details: Install roofing system in accordance with applicable NRCA Manual Plates and NRCA recommendations; modify as required to comply with manufacturer's approved details and perimeter fastening requirements of FM Global references if applicable. 3.4 INSULATION INSTALLATION A. Comply with membrane roofing system and insulation manufacturer's written instructions for installing roof insulation. B. Tapered Insulation and Crickets: Install tapered insulation under area of roofing to conform to slopes indicated. 1. Where crickets are indicated or required to provide positive slope to drain, make slope of crickets minimum of two times the roof slope, not less than 1/4 inch in 12 inches C. Install insulation under area of roofing to achieve required thickness. Where overall insulation thickness is 2.7 inches (70 mm) or greater, install two or more layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches (150 mm) in each direction. 1. Flat Insulation System on Sloped Roof Deck: Install insulation at minimum thickness as follows:

City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 10 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING a. Minimum total thickness of Continuous Insulation: 1) Minimum thickness of base layer: 1.75 or 2 inches (due to market availability) b. Minimum Continuous Insulation R-value: R-10 2. Insulation Drain Sumps: Tapered insulation sumps, not less than 2 by 2 ft. (600 by 600 mm), sloped to roof drain; sump to maximum depth of not more than 1 inch (25 mm) less than the Project-stipulated continuous insulation thickness based upon code requirements. D. Trim surface of insulation where necessary at roof drains so completed surface is flush and does not restrict flow of water. E. Install insulation with long joints of insulation in a continuous straight line with end joints staggered between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch (6 mm) with insulation. 1. Cut and fit insulation within 1/4 inch of nailers, projections, and penetrations. F. Mechanically Fastened: Install each layer of insulation and secure first layer of insulation to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type. 1. Fasten all layers of insulation to resist uplift pressure at corners, perimeter, and field of roof. G. Cover Boards: Install cover boards over insulation with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches (150 mm) in each direction. Loosely butt cover boards together. 1. Secure cover boards to resist uplift pressure at corners, perimeter, and field of roof. 2. Mechanically fasten cover boards. 3.5 MECHANICALLY FASTENED MEMBRANE ROOFING INSTALLATION A. Mechanically fasten membrane roofing over area to receive roofing and install according to roofing system manufacturer's written instructions. B. Start installation of membrane roofing in presence of roofing system manufacturer's technical personnel. C. Accurately align membrane roofing and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps. D. Mechanically fasten or adhere membrane roofing securely at terminations, penetrations, and perimeter of roofing. E. Apply membrane roofing with side laps shingled with slope of roof deck where possible.

City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 11 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING F. Two perimeter half sheets are required. G. Welded Seams: Clean seam areas, overlap membrane roofing, and hot-air weld side and end laps of membrane roofing and sheet flashings according to manufacturer's written instructions to ensure a watertight seam installation. 1. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut edges of sheet membrane. 2. Verify field strength of seams a minimum of twice daily and repair seam sample areas. 3. Repair tears, voids, and lapped seams in roofing that does not comply with requirements. 3.6 BASE FLASHING INSTALLATION A. Install sheet flashings and preformed flashing accessories and adhere to substrates according to membrane roofing system manufacturer's written instructions. B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate and allow to partially dry. Do not apply to seam area of flashing. C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet flashing. D. Clean seam areas, overlap, and firmly roll sheet flashings into the adhesive. Hot-air weld side and end laps to ensure a watertight seam installation. E. Seal top termination of base flashing with a metal termination bar and a continuous bead of joint sealant. F. Perimeter wall flashings: 1. Remove existing sprayed foam. 2. Install ¼ dens deck prime into block wall. 3. Fully adhere KEE membrane to secured dens deck. 4. Install a 1 turn bar at top of 8” high base flashing. 5. Install a second turn bar 36” above first turn bar. 3.7 METAL COPING A. Install metal copings per manufacture warrantable guidelines and local wind zone requirements. B. Use typical cover plate detail. C. Coping must slope inward to roof.

City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 12 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING

3.8 WALKWAY INSTALLATION A. Flexible Walkways: Install walkway products in locations indicated. Heat weld to substrate or adhere walkway products to substrate with compatible adhesive according to roofing system manufacturer's written instructions. 1. Install a min of 60’ of walkway in recommended layout attached 3.9 FIELD QUALITY CONTROL A. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion. B. Repair or remove and replace components of membrane roofing system where inspections indicate that they do not comply with specified requirements. C. Additional inspections, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. 3.10 PROTECTING AND CLEANING A. Protect membrane roofing system from damage and wear during remainder of construction period. When remaining construction will not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Owner's Consultant and Owner. B. Correct deficiencies in or remove membrane roofing system that does not comply with requirements; repair substrates; and repair or reinstall membrane roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements. C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction. END OF SECTION 075416 City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 13 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING Typical-Details:

DWG NO. 01N.T.S.TREMPLY KEE LV BONDINGADHESIVEGALVANIZED ANNULARRING SHANK NAILS(6" O.C.)ADHERED PER SPECIFICATIONINSULATION ATTACHED OR ROOF TOP UNITOR SKYLIGHTEPDM WASHERED FASTENERAS REQUIREDTREMPLY KEE MEMBRANE FLASHING(3" O.C.)GALVANIZED ANNULAR RING SHANK NAILS ATTACHED @ 250 LBF/FTWOOD BLOCKING/CURB CONSTRUCTION
ROOF TOP UNITOR SKYLIGHTEPDM WASHERED FASTENERAS REQUIREDFASTENERS (12" O.C.)METAL COUNTERFLASHING,FASTEN WITH EPDM WASHEREDTREMPLY KEE FLASHING (FULLY ADHERED)NON-LIFTABLEAPPROVED SEALANTBEHIND TOP OF FLASHING

TREMPLY KEETYPICAL WOOD CURB OR SKYLIGHT
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 14 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 03N.T.S.

INSULATION ATTACHED PERSPECIFICATION REQUIREMENTSTREMPLY KEE MEMBRANEHOT AIR WELDTREMPLY KEE MEMBRANE FLASHING STRIPGALVANIZED ANNULAR RINGSHANK NAILS (6" O.C.)TREMCO METALHOT AIR WELD METAL GUTTER (BY OTHERS)WOOD BLOCKINGATTACHED @ 250 LBF/FTFASTEN WITH GALVANIZED ANNULARRING SHANK NAILS (3" O.C.)CONTINUOUS GALVANIZED METAL CLEATJOINT TREATMENT AT EDGE METAL4" MIN.1/4"2"4"TREMCO METAL2" WIDEOVER JOINT1/4" GAPALUMINUM TAPE4" WIDE FLASHING STRIP,HEAT WELDED IN PLACETREMPLY KEE MEMBRANE EDGE FLASHING STRIP

TREMPLY KEEGUTTER FLASHING
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 15 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 07N.T.S.

INSULATED CURB OR HATCH ASSEMBLYTREMPLY KEE METAL FLASHINGHOT AIR WELDGALVANIZED ANNULAR RINGSHANK NAILS (6" O.C.)WOOD BLOCKING ATTACHED@ 250 LBF/FTINSULATION ATTACHED PERSPECIFICATION REQUIREMENTSHOT AIR WELDTREMPLY KEE MEMBRANETREMPLY KEE MEMBRANE FLASHING STRIPAS REQUIREDEPDM WASHERED FASTENER

TREMPLY KEEINSULATED CURB OR FIRE HATCH
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 16 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 10N.T.S.

PIPE PENETRATION
SPECIFICATION REQUIREMENTSINSULATION ATTACHED PERTREMPLY KEE MEMBRANEWORM GEAR CLAMPSTAINLESS STEELAPPROVED SEALANT8" MIN.TREMPLY PLUS FASTENER& STRESS PLATE(MIN. 4 FASTENERS)HOT AIR WELDNON-REINFORCED TREMPLY PLUS FIELDFORMED FLASHING MEMBRANETREMPLY KEE LV BONDING ADHESIVENON-REINFORCED FTR FIELDFORMED FLASHING MEMBRANEHOT AIR WELD

TREMPLY KEEFIELD FABRICATED PIPE FLASHING
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 17 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 16N.T.S.

METAL RAIN COLLARMETAL SLEEVEMECHANICALLY ATTACHEDTO STRUCTURAL SUBSTRATEAPPROVED SEALANTWORM GEAR CLAMPSTAINLESS STEEL8" MIN.STAINLESS STEELWORM GEAR CLAMPHEATED STACK OR PIPE ADHERE FLASHING TO METAL SLEEVEWITH APPROVED ADHESIVE(MIN. 4 FASTENERS)& STRESS PLATETREMPLY PLUS FASTENER

TEMPERATURE APPROPRIATE SEALANTHOT AIR WELDINSULATION ATTACHED PERSPECIFICATION REQUIREMENTS

NON-REINFORCED TREMPLY KEE FIELDFORMED FLASHING MEMBRANE

TREMPLY KEEHEATED STACK FLASHING WITH METAL COLLAR
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 18 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 1N.T.S.TREMPLY KEEPROTECTION PAD &WALK WAY MATERIALS 50'28"
24"48"6"6" 6" X 6" TREMPLY KEE MEMBRANE WELDED TO BACKOF PROTECTION PAD, ANDTO TEREMPLY KEE FIELD MEMBRANE (Typical 4 Corners) HOT AIR WELD (Typical)30" GRAY PROTECTION PAD2 FT. X 4 FT. X 1/4 IN. PVCOSHA YELLOW W/ DIAMONDPROTECTION PAD28 IN. X 50 FT. X 90-MIL KEE WALK WAY PAD30 IN. X 50 FT. X 5/32 INMELLOW YELLOW W/ DEEPHERRING BONE TREAD PATTERNPLATE TREAD PATTERNHOT AIR WELD (Typical)LEAVE 6" MIN. UN-WELDED ATDRAINAGE SIDE OF WALKWAY City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 19 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 06N.T.S.ADHERED IN TREMPLY KEE LVBONDING ADHESIVETREMPLY KEE MEMBRANE FLASHING8" MIN.OR SKYLIGHTROOF TOP UNITHOT AIR WELDTREMPLY KEESPECIFICATION REQUIREMENTSINSULATION ATTACHED PERATTACHED @ 250 LBF/FTWOOD BLOCKING/CURB CONSTRUCTIONMEMBRANERING SHANK NAILSGALVANIZED ANNULAR(6" O.C.) (3" O.C.)GALVANIZED ANNULAR RING SHANK NAILSEPDM WASHERED FASTENERAS REQUIREDPREMOLDED CORNERTREMPLY KEE FLASHING (FULLY ADHERED)EPDM WASHERED FASTENERS (12" O.C.)METAL COUNTERFLASHING, FASTEN W/NON-LIFTABLEMECHANICAL UNITAPPROVED SEALANTBEHIND TOP OF FLASHING

TREMPLY KEETYPICAL WOOD OR SKYLIGHT CURB FLASHING
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 20 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 01N.T.S.

TREMCO METALTREMPLY KEE MEMBRANE FLASHING STRIPTREMPLY KEE MEMBRANEGALVANIZED ANNULAR RINGSHANK NAILS (6" O.C.)HOT AIR WELDINSULATION ATTACHED PERSPECIFICATION REQUIREMENTSWOOD BLOCKINGATTACHED @ 250 LBF/FTCONTINUOUS GALVANIZED METAL CLEATBUTYL SEALING TAPE (OPTIONAL)RING SHANK NAILS (3" O.C.)FASTEN WITH GALVANIZED ANNULAR JOINT TREATMENT AT EDGE METAL4" MIN.1/4"2"4"TREMCO METAL2" WIDEOVER JOINT1/4" GAPALUMINUM TAPE4" WIDE FLASHING STRIP,HEAT WELDED IN PLACETREMPLY KEE MEMBRANE EDGE FLASHING STRIP

TREMPLY KEETYPICAL EDGE FLASHING
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 21 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 06N.T.S.ADHERED IN TREMPLY KEE LVBONDING ADHESIVETREMPLY KEE MEMBRANE FLASHING8" MIN.OR SKYLIGHTROOF TOP UNITHOT AIR WELDTREMPLY KEESPECIFICATION REQUIREMENTSINSULATION ATTACHED PERATTACHED @ 250 LBF/FTWOOD BLOCKING/CURB CONSTRUCTIONMEMBRANERING SHANK NAILSGALVANIZED ANNULAR(6" O.C.) (3" O.C.)GALVANIZED ANNULAR RING SHANK NAILSEPDM WASHERED FASTENERAS REQUIREDPREMOLDED CORNERTREMPLY KEE FLASHING (FULLY ADHERED)EPDM WASHERED FASTENERS (12" O.C.)METAL COUNTERFLASHING, FASTEN W/NON-LIFTABLEMECHANICAL UNITAPPROVED SEALANTBEHIND TOP OF FLASHING

TREMPLY KEETYPICAL WOOD OR SKYLIGHT CURB FLASHING
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 22 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 11N.T.S.

TREMPLY KEE LV BONDINGBUTYL SEALING TAPE (BY OTHERS)TREMPLY KEE MEMBRANE FLASHINGTREMPLY KEE MEMBRANE FLASHINGTREMPLY KEE MEMBRANE FLASHINGTREMPLY KEE MEMBRANE FLASHING STRIP APPROVED 1/8" X 1" ALUMINUM BARATTACHED (8" O.C.)HOT AIR WELDTREMPLY KEE FASTENER & S/P(18" O.C.)TREMPLY KEE FASTENER & S/P(18" O.C.)HOT AIR WELDTREMPLY FASTENER (18" O.C.)4" CLAD METAL STRIPTREMPLY KEEWALL FLASHING / INTERMEDIATE ATTACHMENT

ADHESIVETREMPLY KEE LV BONDINGADHESIVE
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 23 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 08N.T.S.

METAL COPING CAPEPDM WASHERED FASTENERS(12" O.C.)WOOD BLOCKINGATTACHED @ 250 LBF/FTTREMPLY KEE LV BONDING ADHESIVETREMPLY KEE MEMBRANE FLASHINGGALVANIZED ANNULAR RINGSHANK NAILS (6" O.C.)WOOD BLOCKINGATTACHED @ 250 LBF/FTHOT AIR WELDTREMPLY KEE MEMBRANEINSULATION ATTACHED PERSPECIFICATION REQUIREMENTS CONTINUOUS GALVANIZED METAL CLEATRING SHANK NAILS (3" O.C.)FASTEN WITH GALVANIZED ANNULARBUTYL SEALING TAPE (BY OTHERS)

TREMPLY KEEWALL FLASHINGWITH METAL CAP FLASHING
City of Lancaster Date of Issue (10/2023) AT Building
075416 - Page 24 of 24 KETONE ETHYLENE ESTER (KEE) ROOFING DWG NO. 07N.T.S.EXISTING METAL COUNTER FLASHINGEPDM WASHERED FASTENERS (12" O.C.)METAL COUNTER FLASHINGTREMPLY KEE LV BONDING ADHESIVETREMPLY KEE MEMBRANE FLASHING APPROVED SEALANT (TOOLED)EPDM WASHERED FASTENERS (12" O.C.)(8" O.C.)APPROVED ALUMINUM TERMINATION BAR,FASTEN WITH APPROVED FASTENERSTREMPLY KEE MEMBRANE FLASHINGTREMPLY KEE LV BONDING ADHESIVEMETAL COUNTER FLASHINGAPPROVED SEALANT (TOOLED)

TREMPLY KEEWALL FLASHINGALTERNATE TERMINATION'S
City of Lancaster Date of Issue (10/2023) AT Building