AGREEMENT FOR PROFESSIONAL CONSULTANT SERVICES
THIS AGREEMENT FOR CONSULTING SERVICES (this “AGREEMENT”) is made and entered into this day of , 20 , by and between the CITY OF LANCASTER, a municipal corporation and charter city (the “OWNER”), and NBBJ, LP, a limited partnership , (the “CONSULTANT”).
RECITALS
WHEREAS, OWNER desires to engage CONSULTANT to perform certain technical and professional services, as provided herein, identified as:
RFQ 811-24 ARCHITECTURAL / ENGINEERING (A/E) SERVICES FOR LANCASTER MUNICIPAL STADIUM RENOVATIONS (REFERENCE: PWCP 24-014)
WHEREAS, the principal members of CONSULTANT are qualified and duly registered/licensed under the laws of the State of California, and CONSULTANT desires to accept such engagement;
NOW, THEREFORE, the parties agree as follows:
1. Parties to the AGREEMENT.
The parties to this AGREEMENT are:
A. OWNER: City of Lancaster
B. CONSULTANT: NBBJ, LP
2. Notices. All written notices required by or related to this AGREEMENT shall be sent by Certified Mail, Return Receipt Requested, postage prepaid and addressed as listed below. Neither party to this AGREEMENT shall refuse to accept such mail; parties to this AGREEMENT shall promptly inform the other party of any changes of address. All notices required by this AGREEMENT are effective on the day of receipt, unless otherwise indicated herein.
OWNER Public Works Director
City of Lancaster
44933 North Fern Avenue
Lancaster, California 93534
CONSULTANT Andrzej Czech
NBBJ, LP
523 W. 6th Street, Suite 300
Los Angeles, CA 90013
3. Successors and Assigns. The terms hereof shall be binding upon and inure to the benefit of the successors and assigns of the parties hereto; provided, however, that no party hereto shall - 2 -
assign any of the benefits and burdens hereunder, whether voluntarily or by operation of law, without prior written consent of the other party, and any such assignments without said consent shall be void.
4. Incorporation by Reference . The Request for Qualifications – RFQ 811 -24 Architectural / Engineering (A/E) Services for Lancaster Municipal Stadium Renovations (Reference:
PWCP 24-014) and CONSULTANT’S Proposal is hereby incorporated in and made a part of this AGREEMENT. CONSULTANT agrees to comply with all of the requirements set forth therein.
5. Precedence of AGREEMENT Documents . If there is a conflict between AGREEMENT documents, the document highest in precedence shall control. The precedence shall be:
First: This AGREEMENT consisting of 50 pages
Second: Request for Qualifications – RFQ 811-24 - Architectural / Engineering (A/E) Services for Lancaster Municipal Stadium Renovations (Reference: PWCP 24-014)
Third:
Fourth:
The CONSULTANT’S Statement of Qualifications
The CONSULTANT’S Proposal
6. Description of Work. OWNER hereby engages CONSULTANT, and CONSULTANT accepts such engagement, to perform the technical and professional services set forth in the “Scope of Services” attached hereto as Exhibit “A”. CONSULTANT shall perform and complete, in a manner satisfactory to OWNER, all work and services set forth in Exhibit “A”. The Public Works Director or their designee shall have the right to review and inspect the work during the cour se of its performance at such times as may be specified by the Public Works Director, or their designee.
7. Obligations of the OWNER.
A. The total compensation to be paid by OWNER to CONSULTANT for all work and services described in Exhibit “A” is not to exceed $1,630,180.00. CONSULTANT’S fees and charges for the work and services performed shall in no event exceed those set forth in Exhibit “B” attached hereto and made a part hereof.
B. No payment made hereunder by OWNER to CONSULTANT, other than the final payment, shall be construed as an acceptance by OWNER of any work or materials, nor as evidence of satisfactory performance by CONSULTANT of its obligations under this AGREEMENT.
8. Obligations of the CONSULTANT.
A. CONSULTANT shall perform as required by this AGREEMENT. CONSULTANT also warrants on behalf of itself and all subcontractors engaged for the performance of this AGREEMENT.
B. CONSULTANT shall be responsible for payment of all employees' and subcontractor's wages and benefits, and shall comply with all r equirements pertaining to employer's liability, workers' compensation, unemployment insurance, and Social Security. - 3 -
9. Senate Bill 854.
SB 854 bill signed into law on June 20, 2014, established a new public works contractor registration program to replace prior Compliance Monitoring Unit (CMU) and Labor Compliance Program (LCP) requirements for bond -funded and other specified public works projects. The Department of Industrial Relations (DIR) requires all contractors and subcontractors who bid or perform work on a public works project (as defined under the Labor Code) be subject to a registration and annual renewal fee.
Contractors must apply online and meet minimum qualifications to be registered as eligible to bid and work on public works projects. The requirement to list only registered contractors and subcontractors on bids becomes effective on March 1, 2015. The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or aft er April 1, 2015. This project shall comply with the requirement of SB 854.
Coverage is not limited only to work performed at the construction site by the traditional construction trades, but extends broadly to workers employed “in the execution of” the public works contract.
Survey and Geotechnical Services will only need to register if the scope of services provided would require the payment of prevailing wage and be considered to be covered under the California Labor Code. Even though survey and geotec hnical services typically are viewed as consultants and generally do not necessarily fit the term “contractor,” compliance with section SB 854 will be required by the Department of Industrial Relations ("DIR"). Essentially, if the services provided by a survey or geotechnical services firm would be considered to be covered under the applicable California Labor Code sections, then they should register. It should be noted that only the firm needs to register and not individual licensed design professional(s).
Attention is directed to the revisions to Labor Code Section 4. 1725.5 and Section 5. 1771.1:
A. SECTION 4 1725.5
“A contractor (consultant) must be registered pursuant to this section in order to be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work that is subject to requirements of this chapter. (a) To qualify for registration under this section, a contractor must do all of the following:
(1) Beginning July 1, 2014, register with the Department of Industrial Relations in the manner prescribed by the department and pay an initial non -refundable application fee of $300 to qualify for registration under this section and an annual renewal fee on or before July 1st each year thereafter. The annual renewal fee shall be in a uniform amount set by the Director of Industrial Relations, and the initial registration and renewal fees may be adjusted no more than annually by the director to support the costs specified in Section 1771.3. (2) Provide such evidence, disclosures, or releases as are necessary to establish all of the following:
(A) Worker’s Compensation coverage that meets the requirements of Division 4 (commencing with Section 3200) and includes sufficient coverage for any worker who the contractor will employ to perform work that is subject to prevailing wage requirements other than a contractor who, is separately registered under this section. Coverage may be evidenced by a current and valid Certificate of Workers’ Compensation - 4 -
Insurance or Certification of Self-Insurance required under Section 7125 of the Business and Professions Code.
(B) Where applicable, the contractor is licensed in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code. (C) The contractor does not have any delinquent liability to an employee or the state for any assessment of back wages, or related damages, interest, fines, or penalties pursuant to any final judgment, order, or det ermination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award. However, for any judgment, order, or determination that is under appeal, provided that the contractor has secured the payment of any amoun t eventually found due through a bond or other appropriate means.
(D) The contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works. (E) The contractor has not bid on a public works contract, been listed in a bid proposal, or engaged in the performance of a contract for public works without being lawfully registered in accordance with this section, within the preceding 12 months, or since the effective date of the requirements set forth in subdivision (f), whichever is shorter. For a contractor found to be in violation of the requirements of this paragraph only, the period of disqualification shall be waived if: (i) the contractor has not previously been found to be in violation of the requirements of this paragraph within the preceding 12 months; and (ii) the contractor pays an additional non-refundable penalty registration fee of $2,000. (b) Fees received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established pursuant to Section 1771.3 and shall be used only for the purposes specified in subdivision (b) of Section 1771.3
(c) The term “contractor,” as used in this section, shall include any subcontractor or “consultant”, as defined in Section 1722.1.
(d) A contractor who fails to pay the renewal fee required under paragraph (1) of subdivision (a) on or before the expiration of any prior period of registration shall be prohibited from bidding on or engaging in the performance of any contract for public work until once again registered pursuant to this section. A contractor who inadvertently fails to pay the renewal fee may retroactively renew its registration by paying an additional non-refundable penalty renewal fee equal to the amount of the renewal fee within 90 days of the date of the renewal fee. (e) The requirements of this section shall not apply with respect to any contract, which as a result of a determination by the Director of Industrial Relations pursuant to Section 1773.5 or decision by a court that classifies, after the time at which the body awarding the contract accepts the contractor’s bid or awards the contractor a contract, the work covered by the bid or contract as a “public work,” as defined in this chapter, to which Section 1771 applies, provided that:
- 5 -
(1) The body awarding the contract failed to identify as a public work, in the bid specification or in the contract documents that portion of the work that the determination or decision classifies as a “public work.”
(2) Within twenty (20) days following service of notice on the awarding body of a determination by the Director of Industrial Relations pursuant to Section 1773.5 or a decision by a court that the contract was for public work as defined in this ch apter, the contractor and any subcontractors are registered under this section or are replaced by a contractor or subcontractors who are registered under this section. (3) The requirements of this section shall apply prospectively only to any bid, bid proposal, contract, or work performed after the awarding body is served with notice of the determination or decision referred to in paragraph (2) of this subdivision. (f) The requirements of this section shall apply to any bid proposal submitted on or after M arch 1, 2015, and any contract for public work, as defined in this chapter, entered into on or after April 1, 2015.”
B. SECTION 5 1771.1
(a) No contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered to perform public work pursuant to Section 1725.5 It shall not be a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Sections 10164 or 20103.5 of the public work pursuant to Section 1725.5 at the time the contract is awarded.
(b) Notice of this requirement shall be incl uded in all bid invitations and public works contracts, and no bid shall be accepted nor any contract or subcontract entered into without proof of the contractor or subcontractor’s current eligibility to perform public work pursuant to Section 1725.5.
(c) An inadvertent error in listing a subcontractor who is not registered pursuant to Section 1725.5 in a bid proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following requirements are met:
(1) the subcontractor is registered prior to the bid opening; (2) within 24 hours after the bid opening the subcontractor is registered and has paid the penalty registration fee specified in paragraph (E) of subdivision (2) of Section 1725.5; or ( 3) the subcontractor is replaced by another registered subcontractor pursuant to Section 4107 of the Public Contract Code. (d) Failure by a subcontractor to be registered to perform public work as required by subdivision (a) of this Section shall be grounds under Section 4107 of the Public Contract Code for the contractor, with the consent of the awarding authority, to substitute a subcontractor who is registered to perform public work pursuant to Section 1725.5 in place of the unregistered subcontractor.
(e) The DIR shall maintain on its website a list of contractors who are currently registered to perform public work pursuant to Section 1725.5.
- 6 -
(f) A contract entered into with any contractor or subcontractor in violation of subdivision (a) shall be subject to cancellation. However, no contract for public work shall be unlawful, void, or voidable solely due to the failure of the awarding body, contractor, or any subcontractor to comply with the requirements of Section 1725.5 or this section.
A. This section shall apply to any bid proposal submitted on or after March 1, 2015, and any contract for public work entered into on or after April 1, 2015. This project shall comply with the requirements of SB 854.
10. Payment of Prevailing Wage.
A. The State of California, Department of Industrial Relations, has ascertained the general prevailing rate of wages and employer payments for health and welfare, vacation, pension, and similar purposes applicable to the field work to be done. These rates shall be the minimum wage rates for this project. These rates are on file with the City of Lancaster and copies will be made available to any interested party upon request.
Attention is directed to the provisions of Section 1777.5 (Chapter 1411, Statutes of 1968) and Section 1777.6 of the Labor Code concerning the employment of apprentices by the CONSULTANT or any subcontractor under him.
Section 1777.5, as amended, requires the CONSULTANT or subcontractor employing tradesmen in any apprenticeable occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval.
The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases shall not be less than one to five except:
(A) When unemployment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15% in the 90 days prior to the request for certificate; or (B) When the number of apprentices in training in the area exceeds a ratio of one to five; or (C) When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis statewide or locally; or (D) When the CONSULTANT provides evidence that he employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen.
The CONSULTANT is required to make contributions to funds established for the administration of apprenticeship programs if he employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other Contractors on the public works site are making such contributions.
The CONSULTANT and any subcontractor under them shall comply with the requirements of Section 1777.5 and Section 1777.6 in the employment of apprentices.
Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. - 7 -
B. The provisions of subsection A above shall be included in all solicitations or advertisements placed by or on behalf of CONSULTANT for personnel to perform any services under this AGREEMENT. OWNER shall have access to all documents, data and records of CONSULT ANT and its subcontractors for purposes of determining compliance with the Prevailing Wage provisions of this Section.
11. Audit. OWNER shall have the option of inspecting and/or auditing all records and other written materials used by CONSULTANT in preparing its statements to OWNER as a condition precedent to any payment to CONSULTANT.
12. Hold Harmless and Indemnification . CONSULTANT agrees to indemnify and hold harmless the OWNER, its officers and employees, from and against any and all claims, losses, obligations, or liabilities whatsoever, including reasonable Attorney’s fees, incurred in or in any manner arising out of or related to CONSULTANT’S negligent or willful wrongful acts, errors or omissions, or those of its employees or agents. CONSULTANT agrees to defend OWNER, it officers and employees, from and against any and all claims arising from any alleged negligent or wrongful acts, errors or omissions on the part of CONSULTANT or on the part of its employees.
13. Amendments. Any amendment, modification, or variation from the terms of this AGREEMENT shall be in writing and shall be effective only upon mutual written approval by the Public Works Director and CONSULTANT.
14. Non-Discrimination and Equal Employment Opportunity.
A. In the performance of this AGREEMENT, CONSULTANT shall not discriminate against any employee, subcontractor, or applicant for employment because of race, color, religion, ancestry, sex, national origin, physical or mental disability or age. CONSULTANT will take affirmative action to ensure that subcontractors and applicants are employed, and that employees are treated during employment without regard to their race, color, religion, ancestry, sex, national origin, physical or mental disability or age. Affirmative action relating to em ployment shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment; layoff or termination; rates of pay or other forms of compensation; and selection for training including apprenticeship.
B. The provisions of subsection A above shall be included in all solicitations or advertisements placed by or on behalf of CONSULTANT for personnel to perform any services under this AGREEMENT. OWNER shall have access to all documents, data and records of CONSULTANT and its subcontractors for purposes of determining compliance with the equal employment opportunity and non-discrimination provisions of this Section.
15. Termination for Convenience. The governing board of the OWNER may terminate this AGREEMENT at any time without cause by giving fifteen (15) days written notice to CONSULTANT of such termination and specifying the effective date thereof. In that event, all finished or unfinished documents and other materials shall, at the option of OWNER, become the OWNER's property . If this AGREEMENT is terminated by OWNER as provided herein, CONSULTANT will be paid a total amount equal to its costs as of the termination date, plus ten percent (10%) of that amount for profit. In no event shall the amount payable upon termination exc eed the total maximum compensation provided for in this AGREEMENT.
- 8 -
16. Termination for Cause.
A. The governing board of the OWNER may, by written notice to CONSULTANT, terminate the whole or any part of this AGREEMENT in any of the following circumstances:
(1) If CONSULTANT fails to perform the services required by this AGREEMENT within the time specified herein or any authorized extension thereof; or (2) If CONSULTANT fails to perform the services called for by this AGREEMENT or so fails to make pr ogress as to endanger performance of this AGREEMENT in accordance with its terms, and in either of these circumstances does not correct such failure within a period of ten (10) days (or such longer period that OWNER may authorize in writing) after receipt of notice from OWNER specifying such failure.
B. In the event OWNER terminates this AGREEMENT in whole or in part as provided above in paragraph A of this Section, OWNER may procure, upon such terms and in such manner as it may deem appropriate, services similar to those terminated.
C. If this AGREEMENT is terminated as provided above in paragraph A, OWNER may require CONSULTANT to provide all finished or unfinished documents, data, studies, drawings, maps, photographs, reports, etc., prepared by CONSULTANT. Upon such termination, CONSULTANT shall be paid an amount equal to the contract amount, less the cost of hiring another CONSULTANT to complete CONSULTANT's services. In the event no new CONSULTANT is employed, CONSULTANT shall be paid an amount equal to the value of the work performed. In ascertaining the value of the work performed up to the date of termination, consideration shall be given to completed work and work in progress, complete and incomplete drawings, and other documents whether delivered to OWNE R or in possession of CONSULTANT, and authorized reimbursement expenses.
D. If, after notice of termination of the AGREEMENT under the provisions of this Section, it is determined, for any reason, that CONSULTANT was not in default, or that the default was excusable, then the rights and obligations of the parties shall be the same as if the notice of termination had been issued pursuant to Section 15.
17. Independent Contractor. CONSULTANT is an independent contractor and shall have no power or authority to inc ur any debt, obligation or liability on behalf of the OWNER. It is expressly understood between the parties to this AGREEMENT that no employee/employer relationship is intended; CONSULTANT is an independent contractor.
18. Insurance.
A. The CONSULTANT, at its expense, shall maintain in effect at all times during the term of this AGREEMENT the following coverage and limits of insurance, which shall be maintained with insurers listed "A-, VIII" or better in the Best's Key Rating Guide:
Commercial General Liability
Each Occurrence $2,000,000
Per Project General Aggregate $5,000,000
Including Products/Completed Operations; Contractual Liability/Independent Contractors; Property Damage
(Coverage shall be at least as broad as ISO form CG2010 11/85 or CG2010 07/04 - 9 -
and CG2037 07/04 combined, or an equivalent providing ongoing and completed operations)
Commercial Automobile Liability
Combined Single Limit per Accident for
Bodily Injury and Property Damage $5,000,000
(Coverage shall be at least as broad as ISO form CA00 01) Workers Compensation
As Required by the State of California Statutory Limits Employer’s Liability
Each Accident $1,000,000
Bodily Injury by Disease $1,000,000
Each Employee $1,000,000
(A Waiver of Subrogation must be provided on behalf of the Certificate Holder for the Workers Compensation & Employers’ Liability policies) Professional Liability
Each Occurrence $5,000,000
General Aggregate $5,000,000
B. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insured’s liability.
C. Professional liability insurance written on a “claims made” basis must be renewed for a period of three (3) years afte r this contract expires or is terminated. Such insurance must have the same coverage and limits as the policy that was in effect during the term of this contract and will cover Consultant for all claims made by the City insured entities arising out of any acts or omissions of Consultant or its officers, employees, or agents during the time this Agreement was in effect.
D. Any deductibles or self-insurance retentions must be declared and approved by the City. At the City’s option, either the insurer shall reduce or eliminate such deductibles or self- insured retentions as respects the City insured entities or the insurer shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.
E. All insurance shall be primary and non-contributory as respects the City insured entities. Any insurance or self-insurance maintained by the City insured entities shall be in excess of the Consultant’s insurance and shall not contribute with it.
F. Consultant shall furnish the City with Certificates of Insurance and with original endorsements effecting coverage required by this Agreement. Certificates of Insurance shall meet the following requirements:
(1) Show that the insurance policy has been endorsed to state that coverage shall not be suspended, voided, cancelled, reduced in coverage or in limits except after 30 days prior written notice (10 days written notice for non- payment) to the City of Lancaster.
- 10 -
(2) List in the “Descriptions of Operations/Locations/Vehicles” section:
“RFQ 811-24 ARCHITECTURAL / ENGINEERING (A/E) SERVICES
FOR – LANCASTER MUNICPAL STADIUM RENOVATIONS
(REFERENCE: PWCP 24-014)”
The City of Lancaster, its elected officials, officers, employees, and volunteers are included as additional covered parties, but only insofar as the operations under this contract are concerned.”
(3) List in the “Certificate Holder” section:
The City of Lancaster
44933 Fern Avenue
Lancaster, California 93534
G. Consultant shall include all subcontractors as an insured under its policies or shall furnish separate certificates and endorsements for each subcontractor. Subcontractors are subject to the same insurance requirements as the Consultant.
19. Commencement and Completion of Work . The execution of this AGREEMENT by the parties does not constitute an authorization to proceed. The services of CONSULTANT shall commence when the OWNER, acting by and through its Public Works Director or their designee, has issued the Notice to Proceed.
CONSULTANT shall have no claim for compensation for any services or work which has not been authorized by the OWNER's Notice to Proceed.
20. Extension of Time for Completion of Work.
A. If, at any time, the work is delayed due to suspension order by OWNER, or due to any other cause which, in the reasonable opinion of the OWNER, is unforeseeable and beyond the control and not attributable to the fault or negligence of CONSULTANT, then CONSULTANT shall be entitled to an extension of time equal to said delay, subject to the OWNER's right to terminate this AGREEMENT pursuant to Section 15.
B. CONSULTANT shall submit to OWNER a written request for an extension of time within ten (10) days after commencement of such delay, and failure to do so shall constitute a waiver thereof. OWNER shall, in its sole discretion, determine whether and to what extent any extensions of time shall be permitted.
C. No extension of time requested or granted hereunder shall entitle CONSULTANT to additional compensation unless, as a consequence of such extension, addi tional work must be performed. In such event, OWNER shall in good faith consider any request for additional compensation submitted by CONSULTANT.
21. Ownership of Documents. All plans, specifications, reports, studies, tracings, maps and other documents prepared or obtained by CONSULTANT in the course of performing the work required by this AGREEMENT shall be the property of the OWNER. Basic survey notes, sketches, - 11 -
charts, computations and similar data prepared or obtained by CONSULTANT under this AGREEMENT shall, upon request, be made available to OWNER without restriction or limitation on their use.
22. Data Provided to CONSULTANT. OWNER shall provide to CONSULTANT, without charge, all data, including reports, records, maps and other information, now in the OWNER's possession which may facilitate the timely performance of the work described in Exhibit “A”.
23. CONSULTANT's Warranties and Representations . CONSULTANT warrants and represents to OWNER as follows:
A. CONSULTANT has not employed or retained any person or entity, other than a bona fide employee working exclusively for CONSULTANT, to solicit or obtain this AGREEMENT.
B. CONSULTANT has not paid or agreed to pay any person or entity, other than a bona fide employee working exclusively for CONSULTANT, any fee, commission, percentage, gift, or any other consideration contingent upon or resulting from the execution of this AGREEMENT. Upon any breach or violation of this warranty, OWNER shall have the right, in its sole discretion, to terminate this AGREEMENT without further liability, or, in the alternative, to deduct from any sums payable hereunder the full amount or value of any such fee, commission, percentage or gift.
C. CONSULTANT has no knowledge that any officer or employee of the OWNER has any interest, whether contractual, noncontractual, financial, proprietary, or otherwise, in this transaction or in the business of the CONSULTANT, and that if any such interest comes to the knowledge of CONSULTANT at any time, a complete written disclosure of such interest will be made to OWNER, even if such interest would not be deemed a prohibited "conflict of interest" under applicable laws.
D. Upon the execution of this AGREEMENT, CONSULTANT has no interest, direct or indirect, in any transaction or busi ness entity which would conflict with or in any manner hinder the performance of services and work required by this AGREEMENT, nor shall any such interest be acquired during the term of this AGREEMENT.
24. Resolution of Disputes.
A. Disputes regarding the interpretation or application of any provisions of this AGREEMENT shall, to the extent reasonably feasible, be resolved through good faith negotiations between the parties.
B. If the parties cannot resolve the dispute through good faith negotiations, either party may give Notice of Dispute to the other party. The Notice of Dispute shall state the nature of the dispute and the corrective action necessary to remedy the dispute.
After Notice of Dispute, the parties shall first attempt to resolve any disputes by mediation. The parties shall agree on a single mediator. Mediation shall be conducted in Lancaster, California. Each party shall pay its own attorneys’ fees and the costs of mediation shall be split equally between the parties.
If the dispute has not been resolved by mediation within 45 days after Notice of Dispute, or the parties are unable to agree to a mediator, within 15 days after Notice of Dispute, then, the dispute may, upon agreement of the parties be resolved by binding arbitration. - 12 -
25. Exhibits.
The following exhibits to which reference is made in this AGREEMENT are deemed incorporated herein in their entirety:
Exhibit "A" Scope of Services
Exhibit “B” Term, Payment and Time for Commencement and Completion Clause
26. Governing Law.
This AGREEMENT shall be governed by the laws of the State of California.
27. Effective Date.
This AGREEMENT shall become effective as of the date set forth below on which the last of the parties, whether OWNER or CONSULTANT, executes said AGREEMENT. - 13 -
IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be executed and attested by their respective officers thereunto duly authorized.
“OWNER”
CITY OF LANCASTER
LANCASTER, CALIFORNIA
Approved By Department Head:
By:
Marissa Diaz, Public Works Director
Dated:
By:
Jason Caudle, City Manager
Dated:
"CONSULTANT"
NBBJ, LP
By:
Andrzej Czech, Principal
Dated:
ATTEST:
Andrea Alexander
City Clerk
APPROVED AS TO FORM:
Allison E. Burns, Esq.
City Attorney
PW-123 (1/14)
EXHIBIT "A"
SCOPE OF SERVICES
The Consultant shall maintain separate costs for each project and shall identify the costs specific to each project.
The work to be performed under this contract shall include:
SEE ATTACHED
1 EXHIBIT “A”
SCOPE OF SERVICES
PROJECT BACKGROUND, DESCRIPTION, AND LOCATION
The City of Lancaster (City) intends to convert the Lancaster Municipal Stadium (formerly known as The Hanger) from a Baseball Stadium to a Soccer Stadium.
The City is requesting proposal s to provide Architectural and Engineering (A /E) services to prepare Construction Documents for the Lancaster Municipal Stadium Renovations.
With the departure of the Lancaster Jethawks, the City has been searching for a new use for the Lancaster Municipal Stadium (Stadium) . In partnership with Antelope Valley Soccer, Inc., the City will once again offer an opportunity for the community to unite , this time, in support of professional soccer. The City will be converting the 4,600- seat baseball stadium to a 5,300- seat soccer stadium for a new USL team. Phase 1 will include the following:
• Demolition of batting cages, dugouts, and portions of existing stadium seating • Installation of modular standing bleachers and loge seats on the west and south wings of stadium
• Installation of modular standing bleachers for the east side of the soccer field • New Supporters Section standing terraces and canopy for the north side of the soccer field
• Conversion of baseball infield to artificial turf soccer pitch • Access around the field (pedestrian and vehicle)
• LED light upgrades
• Food truck area, berms, and access
• Upgrade to Landscaping and Irrigation
It is anticipated that Phase 2 and later phases will include:
• New Stadium Facility Name Signage
• Upgrade of Suites and Support Areas
• Pitch Village
• Beer Garden
• Family Zone
• Replacement Scoreboard
• Batter’s Screen Conversion to new Marquee
• North Restrooms and Concessions
• East Restrooms and Concessions
This work shall include all research, studies, surveying, utility coordination/mapping, etc. required to prepare Construction Documents for demolition and construction plans, conduit and fiber extension plans , grading plans, building plans (architectural, structural, mechanical, electrical, 2 plumbing, fire safety, etc.), construction details, diagrams, exhibits, special provisions, and construction cost estimates. This work shall also include all other work necessary to coordinate, verify and supplement utility services for Phase 1 of the project and provide for occupancy , including but not limited to plan check and permitting with Lancaster Building & Safety, Antelope Valley Air Quality Management District, Los Angeles County Waterworks Districts, LA County Fire Department, Southern California Edison, LA County Health Department, etc.
GENERAL SCOPE OF SERVICES
Consultant shall provide Construction Documents for the scope of work outlined herein and within the City’s available budget. As budget allows, Consultant shall future proof Phase 1 for Phase 2.
Basic services may include, but are not limited to, the following:
• Site survey services;
• Architectural services;
• Landscape architectural services including minor grading and drainage design to accommodate conversion, food truck area, berms, and access; • Structural engineering services;
• Mechanical and plumbing engineering services;
• Electrical / fire alarm engineering services;
• Low voltage / technology engineering services;
• Fire sprinkler / public water mainline engineering services including easement (as necessary);
• Lighting design services including photometric LED light study; • Civil engineering services including site improvements, grading and accessibility; • Code and accessibility compliance;
• Energy Management;
• Interior design (e.g. fixed finishes, furnishings, furniture, and equipment); • Cost estimating services;
• Design of new Supporters Section standing terraces and canopy for the north side of the soccer field;
• Consult with USL preferred modular stadium designer;
• Integrate recommendations for wind study to be prepared by others; • Future proofing, as budget allows, for Phase 2
• Other design and engineering services as normally and reasonably required for a project of this size and scope;
• Support services during Bidding and Construction
Renovation and conversion include, but are not limited to:
• Demolition of the existing structures to accommodate for new improvements. a. Seating
i. Demolish partial west and south grandstands
ii. Demolish both dugouts
3 • Construction of the new improvements including but not limited to:
a. Seating
i. New west seating on-grade (CIP concrete risers, armchair seats) ii. New west seating at existing dugout
iii. New south endzone seating on- grade (CIP concrete risers, armchair seats)
iv. New south seating at existing dugout
v. New north end Supporters' standing terraces (Aluminum grandstand terraces & foundations)
vi. New east grandstands (Aluminum grandstands w/ individual seats & fdns.)
b. Field level
i. New supporters' section restrooms (Services for portable) ii. Supporters' Section - TIFO rigging, bars, canopies, branding iii. East grandstand restrooms (Services for portable)
iv. Field level concourses accessibility / sidewalks on east, north, and south v. Field level concourse lighting
vi. Landscape and Irrigation upgrades
vii. Grass berms & lawns
c. Concourse level
i. Concourse structure extension down west side
ii. Camera platforms on west side
iii. Wind break fence or wall on west side
d. Site Work
i. General Site Demolition & Clearing
ii. Site Utility Alterations/Extensions
iii. Excavation & Grading
iv. Site Landscaping
v. Replace Turf with new Synthetic Turf (cool top)
vi. Field Lighting Alterations
vii. Demolish Batting Cages
viii. Address Storm Drainage with existing sump pump systems
e. Other Improvements
i. Static field ad boards on 50% of perimeter
ii. New Wayfinding Signage & vinyl graphic scrims at new expansions
It is anticipated that Phase 2 (not included in this contract) will include:
a. Seating
i. New west loge seats
ii. New south endzone loge seating
iii. Field Seats
iv. Optional roof canopy over all east stand seating
4 b. Field level
i. New supporters' section restrooms
ii. East grandstand restrooms
iii. East concourse / outdoor Biergarten
iv. East concession stands for general seating w/ FS equipment v. Corner kick club (northeast corner)
c. Concourse level
i. Food plaza on west side
ii. 9 retrofitted shipping containers for concessions / food plaza iii. West side club / tent structure
iv. West concourse and food plaza lighting
d. Site Work
i. Roads & Walkways
e. Other Improvements
i. New Video Scoreboard
ii. New LED Sideline Runners - 1 @ 3'x342', 2 @ 3'x200' iii. Other Low-Voltage Systems Upgrades (WiFi, Audio, Broadcast, etc.) iv. Portable food carts for new north and east stands
v. Convert Batters' Screen to new marquee
vi. Paint exterior of existing stadium structure
Phase 2 design and later phases will be awarded and completed under separate contract.
The Principal Architect shall assemble and lead the architectural and engineering design team needed to perform all tasks detailed herein and shall include , as a minimum, the following team members licensed in the State of California: A rchitect, Civil Engineer, Structural Engineer, Electrical Engineer, Mechanical Engineer, Landscape Architect, and any other specialty discipline designer required.
The Principal Architect will need to consider future work in the design of Phase 1 and shall include accommodations for Phase 2 that minimize disruption, redundancy, and waste required in Phase 2 with the Phase 1 design. The Principal Architect will also need to consider constraints such as existing service capacity (sewer, water, electricity, etc.) right of way, existing physical improvements, utilities, circulation, parking, park operations, and adjacent properties.
The Principal Architect shall be responsible for final design of all elements of the project. The Principal Architect shall also be responsible to identify all utilities and utility easements that may interfere with the project and coordinate the design of any required utility relocations, new and/or supplemental services.
5 The scope of work for this project is to provide Phase 1 Construction Documents. Limited Schematic Design, and abbreviated Design Development (DD) services shall only be provided to the extent needed to produce Construction Documents from Conceptual plans prepared by ODELL Architects (attached herein for reference). The scope of work for this project shall also include City and other Agency approvals for plan check, permitting, construction and Occupancy ; Phase 1 Bidding Services and Phase 1 C onstruction Support. The Consultant shall perform all studies, surveys, assessments, clearances, and calculations needed for Phase 1 construction.
A detailed outline of the scope of work by Task is included below.
Milestone tasks and Schedule are included herein (Schedule). Payment terms and Fees by tasks and sub-tasks are included in Exhibit “B” (Term, Payment and Time for Commencement and completion Clause).
ITEMS TO BE PROVIDED BY THE CITY
The following items shall be provided by the City and are attached herein for reference:
• Copies of all stadium record drawings within the City archives • Conceptual Plan by ODELL Architects
• Infrastructure record drawings for City infrastructure in Avenue I, Valley Central Way, and Double Play Way, within the City archives.
DESIGN STANDARDS AND CONSULTANT EXPECTATIONS
This project is a local funded project and shall comply with all applicable City, County, State and Federal regulations.
The proposed improvements shall, at a minimum, follow the City of Lancaster Municipal Code , adopted Building Codes, Engineering Design Guidelines Policies and Procedures Manual , and City Policies.
Wherever the City guidelines are absent of the latest industry updates, standards or details, Consultant shall utilize the latest Building Codes, Standard Specifications and Plans for Public Works Construction (“Green Book”), and the Los Angeles County Department of Public Works Design Standards. Wherever there is a conflict in design standards, Consultant shall submit a clarification in writing to the City Project Manager (PM) for direction and approval. In most cases, the more stringent design standards shall apply.
The Consultant shall provide to the City deliverables in hardcopy and electronic format as detailed in the City’s Standards for CAD Deliverables. All drawings shall be prepared in AutoCAD. 6 All plans and exhibits generated shall be for the renovation, however, all existing conditions to remain, to be modified, to be relocated, and/or to be replaced shall be dually noted with the intent that, upon project completion, the Consultant will provide the City with a complete as -built plan for the entire property and all facilities.
In addition, the Consultant shall coordinate and work with the following City Divisions and Departments during design: City Engineering Division (primary), Community Development Division ( Planning Section and Traffic Engineering Section), Real Estate and Economic Development Division ( Building and Safety Section ), Parks, Arts, Recreation & Community Services (PARCS) Department, Public Safety Department , and Information Technology (IT) Department. The City’s Project Manager shall be the main point of contact. Any correspondence between Consultant and City employees, other than the PM, shall be copied same day to the PM as well as in the final deliverables.
PROJECT PERSONNEL
The Principal Architect shall assemble and lead the architectural and engineering design team needed to perform all tasks detailed herein and shall include, as a minimum, the following team members licensed in the State of California: Architect, Civil Engineer, Structural Engine er, Electrical Engineer, Mechanical Engineer, Landscape Architect, and any other specialty discipline designer required.
The Principal Architect shall be responsible for final design of all elements of the project. The Principal Architect shall also be responsible to identify all utilities and utility easements that may interfere with the project and coordinate the design of any required utility relocations, new and/or supplemental services. Additionally, the Principal Architect shall prepare all necessary preliminary and final documents, calculations and/or forms required to secure all necessary permits and approvals required for the construction of the project and occupancy.
ADDITIONAL INFORMATION
The Consultant shall establish and apply internal accounting methods and procedures acceptable to the City for documenting and monitoring contract costs. The Consultant shall submit a consolidated monthly invoice in a format acceptable to the City and broken down in a manner consistent with Exhibit “B”.
The Consultant shall include with the monthly invoice a progress report that reflects the work completed within the invoice period. Payments to the Consultant are to be in arrears. The Consultant must have actually incurred and paid expenses prior to invoicing the City.
The City shall make progress payments per the completed tasks detailed in Exhibit “B,” Form B, submitted by the Consultant. The Consultant shall generate an invoice that details the specific 7 units completed with a cost breakdown with hourly rates for each field function, shall provide sufficient back up to verify expenditures claimed and c onsistency with fee grids by task , with progress report describing work completed during the invoicing per iod, delay details if schedule is slipping, how the Consultant will recover the schedule to meet the contract completion date, and work to be completed in the next invoicing period.
The invoice must include a summary table that details the total contract price, previously paid, current invoice amount, and remaining balance.
Consultant shall not start work prior to receiving Notice to Proceed. The Notice to Proceed shall be issued in writing once the insurance documents are submitted and approved and a Professional Services Agreement has been executed.
Consultant shall not perform additional work without written authorization from the City of Lancaster PM. Written Authorization shall come in the form of an Additional Authorization.
DETAILED SCOPE OF WORK
Listed below are tasks and requirements that the Consultant is expected to perform and meet on this project. It is not intended that the tasks listed are the only tasks required. Each consultant should, based on their expertise, consider other tasks that are required to deliver and achieve the purpose and goals of the project complete.
TASK 1 PROJECT MANAGEMENT
Perform all project management, scheduling, quality control, and quality assurance tasks necessary to maintain the project schedule, budget, and a high-quality set of deliverables to the City.
The Consultant shall schedule bi -weekly meetings (in person, web, or conference call) with the City and design team to provide feedback during the project; maintain schedule; provide a single PM/PE to coordinate with City Capital Engineering PM, other City Departments/Divisions, each task lead/designer, utilities, etc. to deliver a complete consolidated plan set and specification sections that are consistent and do not conflict between improvements; and imple ment QA/QC measures. Consultant must provide quality assurance and control of documents prior to each submittal.
The Consultant shall prepare and distribute the agenda and associated materials minimum 24 hrs in advance of each meeting, and prepare action item minutes following each meeting.
The Consultant shall prepare and review all necessary legal documents, insurance certificates, correspondence, invoices, and associated materials necessary for the successful execution of the contract.
8 1.1 Meetings
o KICK-OFF MEETING
Kick-off meeting shall be held shortly after the issuance of the Notice to Proceed, via Zoom or Teams meeting. The City PM and stakeholders shall provide information, guidance, and answer questions. This meeting shall serve to establish project requireme nts and to document input in developing the final design and construction documents. The meeting shall also be used to clarify the lines of communication and other administrative details.
O PROGRESS MEETINGS
For the basis of Proposal, the Consultant shall assume bi -weekly progress meetings for each design phase, via Zoom or Teams meeting with City PM to review progress and obtain direction, assume 2 progress meetings per month. The Consultant shall maintain a list of action items with projected completion dates and shall include progress updates at meetings and with invoice. The Consultant shall send current action item list via email to the City PM no later than two (2) working days following each progress meeting.
O ADDITIONAL MEETINGS
The Consultant shall organize additional meetings, as required, to complete the project.
Additional meetings include, but are not necessarily limited to, meeting with other agencies such as government agencies and utility companies. Cost for additional meetings shall be included in the not to exceed contract amount. No separate payment shall be made.
1.2 Project Management
Consultant shall prepare and maintain a detailed critical path project baseline schedule with subtasks for all deliverables submitted to the City prior to the first invoice and submit with monthly written project status update reports throughout the duration of the project. In addition to the monthly schedule update, Consultant shall provide a report with measurement of project performance by the use of Earned Value Method. The monthly reports are critical to forecast resource needs and ensure the appropriate staff and support services are available, when needed, to deliver the project on schedule and within budget . Consultant shall notify the PM of any scope, schedule or budget issues that may arise.
The Consultant shall provide all applicable documentation, mapping, plans, forms, and specifications to the City that facilitate successful submittal and approval of primary stakeholders: the Antelope Valley Soccer, Inc. and City of Lancaster PARCS Department. 9 1.3 Quality Assurance & Quality Control
Consultant must provide quality assurance and control of survey, design plans, and estimates prior to each submittal. This task is required to verify that no unsafe design changes have been made or proposed, layout has not been critically altered, improvement goals are being met, economy of project is maintained, plans are consistent across improvements, there are no conflicts between trades, and construction integrity of the design is ensured.
1.4 Permits
The Consultant shall be responsible for determining which permits and agency approvals are required for construction and occupancy. Consultant shall prepare for the City's signature any required permits from Local, State or Federal agencies and other entities. The Consultant shall coordinate; obtain government agency and/or utility permits, agreements, and/or approvals , and incorporate permitting/agency requirements into final Contract Documents.
Consultant shall prepare all supporting calculations, studies, reports and/or forms required for City of Lancaster building plan check and permitting and any other agency plan check and permitting required for construction and occupancy . Consultant shall submit plan check packages to the City Building & Safety Section and any other agencies , revise packages and resubmit, as required, to obtain approval for permit issuance, plan approval, and/or occupancy.
City of Lancaster plan check and permitting fees shall be “no fee.” Outside agency fees shall be the responsibility of the A/E firm and shall be included in the Exhibit “B,” Form B, Cost Proposal; no separate payment shall be made.
1.5 Deliverables
a. Meeting Minutes and Action Items Lists
b. Monthly Reports (Project Baseline schedule & Monthly Updates) c. Record of Coordination Calls
d. Emails
e. Correspondence
TASK 2 RESEARCH AND UTILITIES
2.1 Research
Consultant will research the project in order to prepare construction documents. The investigation will be comprised of readily available record plan and utility research and field investigation.
10 2.2 Utilities
The Consultant shall identify and positively locate all utilities in accordance with underground utilities to determine the depth for clearance and connection points or conflicts for any underground improvements, such as gas lines, sewer lines, storm drains, water lines , etc.
Research all existing utilities (including dry utilities) on the Lancaster Stadium property by submitting Utility Notification Letters with vicinity map exhibits that provides the location for this project. Consultant shall field verify the utility locations represented on these maps and obtain all updated maps from all utility companies including any other utilities not provided by City or mentioned.
The City will not print Utility Notification Letters on City letterhead for the Consultant nor will the City intercede on the Consultant’s behalf to reduce/eliminate costs associated with utility research/coordination. The Consultant shall include all costs for Utility research/coordination in the not to exceed cost proposal, complete. The City will provide Word document template Utility Notification Letters to be used with Consultant letterhead upon request.
The Consultant shall identify on-site services and contact utility companies, as well as identify off-site utilities, including, but not limited to, the following:
• AT&T service
• Charter Communications (Spectrum) service
• Conterra Networks service
• Frontier Telecommunications service
• City of Lancaster Storm Water collection and disposal • City of Lancaster Local Sewer collection and disposal • LA County Sanitation District service and distribution • LA County Waterworks Districts service and distribution • Southern California Edison (Transmission, Distribution, and Telecommunications) service and distribution
• Southern California Gas service and distribution
• Sprint services
• Site Drainage
• Fire Systems
• Site illumination
• Any Central-plant mechanical systems
• Other services and utilities
Consultant shall confirm location, size and adequacy of utilities serving the site, determine requirements for connection to utilities, plan for off-site utility extensions and facilities, and design off-site utility extensions and facilities.
11 2.3 Incidental Research
The Consultant shall perform minor incidental research that may be necessary for the project and design.
2.4 Deliverables
1) Research and Utilities
a) Utility Letter Notifications sent to Utility agencies and Copies of Utility record maps/plans (not provided by City) from Utility agencies (Word doc and PDF) b) Utility Base Map, Digital and Physical Copies
c) Report of existing utility services and availability d) Copies of all incidental research documents (not provided by City) TASK 3 CONSTRCUTION DOCUMENTS
Limited Schematic Design, and abbreviated Design Development (DD) services shall only be provided by the Consultant to the extent needed to produce Construction Documents referencing Conceptual plans.
3.1 Design Development (DD)
3.1.1 Meeting
Conduct an interdepartmental design development meeting to begin the construction documentation process.
3.1.2 Topographical Mapping and Surveying
Provide a completed site survey for the entire stadium site.
3.1.3 Submittal Book Supplement
Based on this scope of work and the conceptual plans by ODELL Architects , prepare a submittal book supplement for the Project showing at minimum: preliminary cost estimate, references/catalog cut sheets for materials and equipment, proposed construction method for structures and facilities (stick built or prefabricated), and cost benefit analysis for three (3) design concepts.
3.1.4 Preliminary Cost Estimate
Prepare the preliminary cost estimate to include the proposed improvements and present a plan for the preferred design concept. Include a list of prioritized additive alternates, additional services, allowances for change orders and City administration, and other items as reviewed by City staff.
12 3.1.5 35% Construction Documents
Based on the comments received and preferred design concept selected, prepare the preliminary 35% construction documents including plans, outline specifications (in CSI format) , and refined cost estimate.
Deliver one (1) PDF of plans and outline specifications with cost estimates to the City. The City staff will require a minimum of two (2) weeks for review of the 35% construction documents.
3.2 Construction Documents (CD)
3.2.1 Geotechnical Investigation
A geotechnical engineer shall conduct a site visit to verify existing site conditions and limitations.
The project may require a full geotechnical report substantiated by a drilling program, the geotechnical engineer shall research available literature for geomorphic, seismological and geotechnical data available in the area, complete a drilling program, perform laboratory testing and soil analysis and prepare a feasibility foundation report to support design as needed.
Provide geotechnical evaluation of existing soils as warranted for playground, grading, foundation design, etc. Submit reports to City staff and inc orporate recommendations into the 75% construction documents.
3.2.2 Utilities Investigation and Coordination
Coordinate with the utility companies and generate a preliminary utility relocation plan.
3.2.3 Design Intent
Prepare cross‐section(s), rendering(s) and an enlarged plan of the stadium improvements as necessary to demonstrate the final design intent. Provide image boards of the proposed improvements included in Phase 1. Provide electronic images of the plans on compact disk and/or thumb flash drive to the City, which can be printed by the City in various sizes for public distribution and display.
3.2.4 75% Construction Documents
Based on comments received, prepare 75% construction documents including plans, specifications, and refined cost estimate.
Deliver one (1) PDF of plans and draft specifications (in CSI format ) to City. Prepare detailed cost estimates for all improvements as per City recommendations. City staff will require a minimum of four (4) weeks for review of 75% construction documents.
13 3.2.5 Meeting (75% Review Comments)
Conduct interdepartmental review sessions to review City comments , assess probable cost of construction vs available budget, and refine scope and cost estimate to get project back within available budget (as needed).
Any revisions to 75% cost estimates and/or re-design required to bring project back within available budget and within scope shall be at no additional cost to the City.
3.2.6 100% Construction Documents
Based on comments received, prepare 100% construction documents including plans, specifications, and detailed estimate. Plans will be prepared to allow for deductive and additive alternates, as necessary.
Deliver one (1) PDF of plans and final specifications (in CSI format) to City. City staff may require a minimum of four (4) weeks for review of 100% construction documents.
3.3 Specifications
The City shall prepare the main body of the specifications (boiler plate); specifications expected from the Consultant shall be limited to Special Provisions beyond the City’s boiler plate sections, technical details, cut sheets and written specifications beyond those provided. Draft specifications shall be provided with plan submittals in CSI format as noted in Tasks 3.1 and 3.2.
3.4 Cost Estimates
The Consultant shall compile and prepare the Cost Estimate s based on all biddable construction items identified in the design package and consistent with the latest City bid forms. The estimated quantities shall be arranged and grouped as agreed with the City PM.
Computations showing estimated quantities and costs for each location of work, as well as the sum totals, shall be submitted to the City. Cost Estimates shall be provided with plan submittals as noted in Tasks 3.1 and 3.2. Quantities and costs shall be updated and in agreement with each plan submittal.
3.5 Deliverables
See items in Sections 3.1 through 3.4 herein.
14 TASK 4 BIDDING AND CONSTRUCTION ENGINEERING SUPPORT SERVICES
4.1 Bid Support
Assist City staff in bidding process as required, including answering questions from bidders and assisting in the preparation of Addenda.
4.2 Submittals
Review and process all shop drawings and submittals required by technical specifications.
4.3 Site Reviews
Provide site reviews and prepare reports on construction progress and quality with recommendations for correction of any deficiencies (approximately four (4) field meetings).
4.4 Change Orders
Assist in preparing technical portions of change orders and sign off on Technical portion of Change Order memoranda.
ADDITIONAL SERVICES NOT INCLUDED
Services other than those set forth in this exhibit shall constitute extra services. Extra services including, but are not limited to, attendance at meetings other than those included in the Scope of Services, additional plans, topographic survey, etc. shall be considered additional services and will be performed only with written authorization from the City and for additional fees to be negotiated prior to authorization.
SCHEDULE
In order to preserve meet building occupancy schedules, time is of the essence. The City intends to contract with the consultant by January, 2024, or soon thereafter. The consultant shall begin the design phase as soon as the contract with the City is executed.
Milestone schedule shall be as listed below:
MILESTONES DATES*
Submittal Book Supplement February 2024***
35% Submittal February 2024***
75% Submittal March 2024***
100% Submittal April 2024
Stamped and Signed Construction Documents April 2024**
15 Permits Issued May 2024
Bid Advertisement May 2024
Award Construction June 2024
Start Construction July 2024
End Construction January 2025
FFE Install February 2025
Occupancy March 2025
* City and Stakeholder’s review periods shall be as noted per Task; no additional time will be awarded for allowable time with City.
** Minimum 2 weeks prior to advertisement.
*** Anticipated dates included, Consultant to provide baseline schedule dates to be approved by the City.
Detailed Gantt chart provided by Consultant and included herein shall be updated every two weeks.
Any delays in critical path items that cannot be absorbed shall be brought to the City Project Managers attention immediately. Milestone schedule and Gantt chart shall be amended at the sole discretion of the City.
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Existing Demo
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Aerial Southwest
Seating Legend
Existing Seats:
Lower Bowl: 2,761
Upper Bowl: 1,578
Suites: 156
Existing Total Seat Count: 4,495
Demo:
West: -835
South: -995
New Seats:
West Extension: 758
South Extension: 632
East Stands: 936
North (Supporter) Stands: 300
New Total Seat Count: 5,291
Legend
1 Multipurpose Field
2 West Stands Expansion
3 South Stands Expansion
4 Pitch Village
5 Beer Garden
6 East Grandstands
7 Supporters Section
8 Family Zone
9 South Berm
10 North Restrooms/Concessions
1 2
3 4 56
7 8
9 12
11 11
East Restrooms/Concessions
West Berm
12 10
N
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Aerial Southwest
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Aerial Southeast
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Aerial Northwest
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Aerial East Beer Garden
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Aerial South Family Zone and Cornerkick Berm
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Perspective South Family Zone and Cornerkick Berm
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Perspective New West Stands
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Perspective Sky Box
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Aerial Supporters Section
©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Field Level Plan Diagram
Numerical Legend
1 Restrooms
2 Concessions
3 Existing Locker Rooms/Utilities
4 Aluminum Grandstands
5 Concrete Grandstand Extensions
6 Soccer Pitch
7 Loge Boxes
8 Food Truck Parking
9 Outdoor Light Grid
10 Grass11
Beer Garden
Berm
12 1
1 2
3 3
3 4
4 5
5 6
7 7
8 8
8 9
10 10
11 11
11 11
11 12
Tent Canopy13 13
3 Concourse Legend
No Change
New Construction
Existing Concourse
New Concourse
Existing Scoreboard14
Graphic/Advertising Marquee15
14 15
Existing Stadium Light Poles16
16 16
2 ©2022 ODELL Associates, Inc., All Rights Reserved.
USL Lancaster: Concourse Plan Diagram
Numerical Legend
1 2
3 4
5 6
7 8
9 10
11 12
3 3
3 4
4 5
5 6
7 7
8 8
8 9
10 10
11 11
11 11
11 12
13 13
3 Concourse Legend
No Change
New Construction
Existing Concourse
New Concourse
14 15
14 15
16 16
16 Restrooms
Concessions
Existing Locker Rooms/Utilities
Aluminum Grandstands
Concrete Grandstand Extensions
Soccer Pitch
Loge Boxes
Food Truck Parking
Outdoor Light Grid
Grass
Beer Garden
Berm
Tent Canopy
Existing Scoreboard
Graphic/Advertising Marquee
Existing Stadium Light Poles
LANCASTER MUNICIPAL
STADIUM RENOVATION
7 Kimley Horn
Civil Engineer, Surveying
Field and Turf
SUBCONSULTANT TEAM
Englekirk / WSP
Structural Engineer
Earth Mechanics
Geotechnical Engineering
TK1SC / WSP
Mechanical Engineering
Electrical Engineering
Andrzej Czech
PIC / Project Manager Margot Jacobs
Landscape
Design Lead
B
ill Glauch
Project Architect /
PermittingAlvin Cheung
Project Designer
NBBJ TEAM
3. Qualifications and Experience of
Management Team and Key Personnel
ECG
Surveying
NBBJ
Landscape Design
LANCASTER MUNICIPAL
STADIUM RENOVATION
14 35% SubmittalSubmittal Book Supplement
• Equivilant o f Construction
Documents
• Begin De
velopment of
Final Selected Concept
from previous phase
• Spec
fication outline
• Cost estimate update
• Geotechnical and
surv
ey review
• R
eview with City
• Coor
dination with site
utilities and company that
supply the site
•
Dr
awings to be included
(but not limited to) -
plans, sections elevations
•
R
enderings included as
internal conceptual
• Pr oject Kick-off and Process
Design Workshop
• Pr
oject Visioning and principals
• Bi-
Weekly workshops (owner/NBBJ)
• Establish schedule o
f permitting
• Full team cr
oss coordination
quality control
• R
eview concept design
(owner provided)
• De
velope 3 concepts, based on the
project scope of services - varring
differences from previous concept
•
Scope, space pr
ogram,
infrastructure / building
systems criteria (MEP)
•
R
eview current infastructure
and select engineering systems
• pr
eliminary cost estimate
• initial material selections
• structur
al recommendations
for construction
• geotechnical and surv
ey initiated
• scan o
f existing facility and BIM
model initiated
The proposal schedule outlined in the project RFQ
description, is the most challenging aspect of this project.
It will take clear concise communication and a structured kick-off meeting that aligns all stakeholders in a schedule consensus. The Design team understand the need for
occupancy in March of 2025, and is tasked with success.
This project will take a bit of an unconventional approach to the document set, due of the schedule. Rather than a standard design phases outlined by the AIA, the team is proposing a single BID Document / Permit Phase (after a concept option at the end of January 2024 is selected), with appropriated phases – 35% / 75% / 100%. During
the Submittal Book Supplement, geotechnical and survey
services will be performed. At the conclusion of 100%
Permit / Bid Documents, an overlapped process of permitting with the City of Lancaster (design team) and the Bid
Advertisement, Bidding, and Contract Award (owner, assist from the design team) will occur – rather than sequentially phase those steps. The design will provide Construction Administrative and Project Close-out, which would consist in Certificate of Occupancy, Record Drawings, and turn-over.
NBBJ’s track record on managing schedules, is the
differentiator. Internally, we call it “appropriate haste” – as we want to make the right decisions while moving at pace.
This process goes back to our clear concise communication and stakeholder transparency. T ools, like our decision matrix, process design, and structured meeting organization, are all utlized on many of our successful phase projects with challenging construction requirements.
Executive T eam
Design T eam
GC OnboardBid Ad. GC Bidding Any Design-Assist
Trade Partners Onboard
Feasibility Study
Program Verifi-
cation
Notice to Proceed
Final Concept Selected Milestone
Milestone
Milestone
Final Permit Package
Pre-Reviews w/ City
Submittal Book
Supplement
35% Submittal -
Permit Set / Bid
Documents
75% Submittal -
Permit Set / Bid
Documents
100% Submittal -
Permit Set / Bid
Documents
Permitting / Bid
Advertisement /
Contract Awarded
Construction
Administration
Project Close-out
Meeting Cadence
35% Submittal -
Permit Set / Bid
Doc.
75% Submittal -
Permit Set / Bid
Doc.
100% Submittal -
Permit Set / Bid
Doc.
Permitting
Bid Ad. / Contract Award
Construction
Submittal Book
Supplement
Survey / Geotechnical
JAN FEB MAR APR MAY JUN JUL
2024
75% Submittal 100% Submittal Permitting / Bid Ad. /
Award Construction
• Equivilant o f Construction
Documents
• Spec
fication draft
• Cost estimate update
• R
eview with City
• Continue
coordination with
site utilities and company
that supply the site
• R
efine floor plan, site plan,
sections, elevation
• Begin to
work on details
• An
y prefabrication systems
selection process
• Finaliz
e exterior finishes
• Interior
finishes (if any)
• Q
A/QC Process
• Final alignment o f scope,
budget, and performance-
based strategies
•
P
eer review, QA/QC Process
• P
ermit packages initiated
• Site mak
e-ready (if req.)
• Site Gr
ading / Site Utilities
• Under
ground Utilities
• Foundation
• Super
structure
• De
velop details with trade
partners
• R
efine Specifications with
owner, consultants, &
GC/trade partners
•
Final code compliance ener
gy
modeling
• BIM Clash Detection
• Final specif
cations
• R
eview with City
• Final cost estimate
• Pr
ogram and quanties
summarized in breakout
• Begin the pr ocess of
permitting with the City of
Lancaster
•
Plan check, permitting,
construction and
occupancy
•
City Building and S
afety
• Support the o
wnership in
the bidding advertisement
• Ans
wer pre-bid
qualification questions
• Support the o
wnership in
any final criteria selection
of the GC
•
C A process workshop
• Establish pr
otocol to
streamline RFI’s
• O
AC meetings
• Field
site visits
• Change or
ders
• Quarterly pr
ocess
assessment workshops
• R
egular updates to
executive team
• Shop dr
awings &
submittals review
• Determine timing o
f
phased punch-list
• R
ecord drawings
Any Design-Assist
Trade Partners Onboard
FEE Preperation
Building
OccupancyFE&EConstruction
Project Close-out
AUG SEP OCT NOV DEC JAN FEB MAR
2025
PW-125 (1/14)
EXHIBIT "B"
TERM, PAYMENT AND TIME FOR COMMENCEMENT AND COMPLETION CLAUSE Term
This Agreement shall become effective and shall be in full force and effect upon the execu tion of the Agreement by the City and the CONSULTANT. This Agreement shall continue in full force and effect for a period of two (2) year from the effective date of the Agreement (the “Term), unless the Agreement is sooner terminated in accordance with the Te rms and Condition s in the Agreement; p rovided, however, that the City and the CONSULTANT may mutually agree in writing to extend the Term of this Agreement.
Payment
The City of Lancaster shall reimburse the CONSULTANT for actual costs, including labor costs and employee benefits incurred by th e CONSULTANT in performance of the work, in an amount not to exceed $1,630,180.00. Actual costs shall not exceed the estimated wage rates an d other costs as set forth in the CONSULTANT’S proposal. Source documentation supporting billed costs must be submitted with invoice. CONSULTANT shall provide a cost breakdown with hourly r ates for each office and field function in th e event th at additional work is required beyond th e not to exceed amount specified above. Any additio nal work will require a separate Author ization for C onsultant Services signed by both parties.
CONSULTANT will be reimbursed, as promptly as fiscal procedures will permit, u pon receipt b y the City of itemized inv oices. In voices shall be submitted no later than forty -five (45) calendar days after the performance of work for which CONSULTANT is billing. Invoices shall d etail the work performed on each milestone, on each p roject, as applicable. In voices shall follow the format stipulated for the Cost Proposal and shall reference this contract number an d project title. Final invoice must contain the final cost and all credits due City. The final invoice should be submitted within sixty (60) calendar days after completion of CONSULTANT’s work.
Consultant shall not be reimbursed for actual travel expenses incurred in the performance of the work.
Time for Commencement and Completion
CONSULTANT shall commence p erformance of the work no later than three (3) calendar days following issuance of Notice to Proceed. I t is anticipated th at perform ance of the work will be completed within fifteen ( 15) months from com mencement. In no event shall perf ormance of the work be completed later than fifteen (15) months from commencement without the prior written authorization of the City. If Consultant fails to complete the work in this time period, City may avail itself of any and all remedies provided for in this Agreement.
Andrzej Czech, Principal
NBBJ, LP
LANCASTER MUNICIPAL
STADIUM RENOVATION
Fee Worksheet February 1, 2022
Fee Total Submittal Book
Supplement 35% Submittal 75% Submittal 100%
Submittal Bid/Award Construction
Administration
Record
Documents Proposal
Basic Services Consultant
Architect NBBJ 1,010,820 62.0% 160,100 137,440 137,440 137,440 72,800 322,400 43,200 $ 1,010,820.00 Structural Englekirk 86,000 5.3% 12,000 18,000 42,000 2,000 12,000 $ 86,000.00 MEP TK1SC 142,000 8.7% 14,300 26,000 26,000 26,000 14,200 35,500 $ 142,000.00 Civil Kimley-Horn 300,000 18.4% 57,000 71,500 71,500 71,500 10,000 18,500 - $ 300,000.00 Geotechnical Earth Mechanics 52,860 3.2% 52,860 - - - - - - $ 52,860.00 Survey ECG 38,500 10,000 18,500 10,000 $ 38,500.00 Subtotal 1,630,180 294,260 265,440 252,940 276,940 99,000 388,400 53,200 1,630,180 Fees by Phase
ASHE CENTER SEISMIC IMPROVEMENTS
University of California, Los Angeles Project No. 908734.01
REV-0 EDPA-STD 09/02/08 Exhibit B
Design Professional Rate Schedule for Additional Services - 1
EXHIBIT B
TO THE
EXECUTIVE DESIGN PROFESSIONAL AGREEMENT
DESIGN PROFESSIONAL RATE SCHEDULE FOR ADDITIONAL SERVICES
TITLE RATE
Partner $425 / Hour
Principal $325 / Hour
Project Manager $280 / Hour
Project Architect $230 / Hour
Architect $180 / Hour
Job Captain $170 / Hour
Intern $120 / Hour