STAFF REPORT
City of Lancaster
CC 7
1/23/2024
JC
Date: January 23, 2024
To: Mayor Parris and City Council Members
From: Marissa Diaz, Director – Public Works
Michael Livingston, Manager – PW City Engineering
Subject: Acceptance of Public Works Construction Project No. 21-014 – Pedestrian Gap Closure Improvements ATPL-5419(050) LACMTA Project ID#MM4501.05 and FTIP#LATP16S002
Recommendation:

Accept the work constructed by C.A. Rasmussen, Inc., for Public Works Construction Project No. 21-014, Pedestrian Gap Closure Improvements ATPL-5419(050) LACMTA Project ID#MM4501.05 and FTIP#LATP16S002 and direct the City Clerk to file the Notice of Completion for the project.

Retention on this project shall be disbursed in accordance with California Public Contract Code Section 22038(b).

Fiscal Impact:
$9,677,454.27 (including 10% contingency) was awarded based on the original contract. There were nineteen (19) Contract Change Orders for this project totaling ($353,217.62), which brought the contract cost from $8,797,685.70 to $8,444,468.08. Sufficient funds were available in Capital Improvements Budget Account numbers CP15SW016.CONST, GL Accounts 21449900.8000, 20149900.8000, 21749900.8000, 22049900.8000, 21249900.8000, 21149900.8000, 41449900.8000, and 30049900.8000.

Background:

The Pedestrian Gap Closure Improvements project was part of a comprehensive effort by the City of Lancaster to promote active transportation. The project improved local and inter-jurisdictional pedestrian trips by closing the gap between existing improvements to move non-motorized users away from the vehicular lanes of travel. This project has encouraged walking and bicycling among all users by increasing safety and mobility with connecting to transit access points and local destinations.

PROJECT LOCATIONS:

No. Street Segment Location
1 5
0 0
1 Division Street Avenue I to Kettering Street Both Sides 2 Avenue H-8 17th Street West to 15th Street West Both Sides 3 Avenue J-8 (AVE J-9) Division Street to 2nd Street East South side 4 Avenue H-8 13th Street West to 10th Street West Both Sides 5 Avenue K 7th Street East to 8th Street East North side 6 5th Street East Avenue K-4 to Avenue K-12 East Side
7 Gadsden Avenue Avenue J-12 to Avenue K Both Sides
8 Avenue J-8 15th Street West to 13th Street West North side 9 Avenue J-8 12th Street West to 10th Street West South side 10 Avenue H 20th Street West to 18th Street West South side 11 Avenue I 7th Street East to Challenger Way South side 12 Lancaster Boulevard Andale Avenue to Challenger Way South side 13 Avenue J (FR) Leatherwood Street to Lone Oak Street North side 14 Avenue J 20th Street West to 17th Street West South side 15 Avenue J-7 Cedar Avenue to Beech Avenue Both Sides
16 Avenue J-8 Beech Avenue to Sierra Highway Both Sides 17 Avenue K Gadsden Avenue to Park Avenue North side
18 Avenue K-8 West of 20th Street West to 18th Street West North side 19 Avenue K-8 Division Street to Gingham Street North side 20 Avenue L 3rd Street East to Division Street Both Sides 21 Avenue L 8th Street West to Sierra Highway Both Sides 22 20th Street West Avenue H to Avenue H-4 Both Sides
23 20th Street West Arbuckle Way to Avenue I West side
24 20th Street West Avenue I to Louise Avenue Both Sides 25 20th Street West Avenue K to Avenue K-10 West side
26 15th Street West Park Somerset Drive to Avenue L East Side 27 15th Street West Avenue K-8 to Avenue K-11 West side 28 *
15th Street West Avenue J-5 to Avenue J-8 (Eliminated) East Side 29 10th Street West (FR) Avenue J-4 to Avenue J-5 West side 30 Division Street Avenue K to Avenue K-4 West side
31 Division Street Kettering Street to Avenue J West side 32 Challenger Way Avenue I to Kettering Street East Side 33 20th Street East Avenue K to Ogden Ln East Side
34 20th Street East Avenue J to Avenue J-8 East Side
35 20th Street East Lancaster to Avenue J East Side
36 20th Street East Jackman Street to Lancaster Boulevard Both Sides 37** Sierra Highway Avenue J-2 to Columbia Way (Ave L-12) West side 38*** Avenue K 45th Street West to Blossom Drive North side *Location 28 was identified as an environmentally sensitive area; therefore, Location 28 has been eliminated and is no longer part of the project **Location 37 excludes parcels 3128-006-042, 3128-006-053 and 3128-006-054 that are already improved ***Location 38 new location as part of minor Scope Change approved by Caltrans/CTC staff This project was funded with Active Transportation Program (ATP) and Los Angeles County Metropolitan Transportation Authority (LACMTA), Measure M (MSP) grant funds in addition to gas tax, Senate Bill 1 (SB1), Air Quality Control (AQMD), Transportation Development Act (TDA) Article 8, Proposition C, Measure R Local Return, Measure M Local Return, and Traffic Impact fee funds.

This project closed the gap in the non-motorized user transportation network with the construction of curb, gutter, sidewalk, and related improvements. Proposed improvements vary depending on location and include other improvements, such as earthwork and grading, road excavation with street widening, construction/reconstruction of curb ramp, driveway, cross gutter, slough curb, parkway drain, asphalt concrete pathway, asphalt concrete dike, asphalt concrete landing, utility adjustment, minor drainage improvement/adjustment, vehicle detection upgrade, relocation of push buttons, minor signing, striping and marking and street lighting system. Where the improvements take place at unimproved intersections near schools, new pedestrian crosswalks and bulb-outs will be installed to shorten crossing distances and allow for safer street crossings.

Construction of the project has been completed to the satisfaction of the Director of Public Works.

The project was substantially completed on April 24, 2023, which was within the time permitted by the contract. The construction quantities and the amount of payment have been approved by the Contractor and the Director of Public Works.

The total contract cost is $8,444,468.08.

ML:AK/km