ADDITIONAL AUTHORIZATION NO. I
FOR CONSULTANT SERVICES
TO: Enda Melvin, Senior Vice President
Kimley-Horn and Associates, Inc.
660 South Figueroa Street, Suite 1040
Los Angeles, CA 90017
Under terms of our Professional Consultant Services Agreement dated January 23, 2014, you are authorized to proceed with the following consulting services:
Project: Program/Project Management Services for Measure R "Highway Equity" Program
Original Authorization: $1,741,380.00, dated January 23, 2014 Contingency Authorized: $104,483.00
This Authorization: $746,450.00
Total Not To Exceed: $2,592,313.00
Project Manager: Marissa Diaz
ACCEPTED:
Enda Melin Jun 5 20153:08 PM
Enda Melvin, Senior Vice President Date
Kimley-Horn and Associates, Inc.
AUTHORIZED:
Mark v Borigin 6-1275
Date
City Manager
MD:tl
EXHIBIT "A"
SCOPE OF SERVICES
The Consultant shall maintain separate costs for each project and shall identify the costs specific to each project.
The work to be performed under this Additional Authorization No. 1 shall include:
SEE ATTACHED
EXHIBIT A: SCOPE OF SERVICES
PROJECT DESCRIPTION AND LOCATION
At its September 19, 2012 meeting, Metro approved the SR-138 project list and funding allocations for Measure R SR-138 Capacity Enhancements that included "Highway Equity" funding of five interchange improvement projects in Lancaster. These projects include improvements to the SR-138 interchange and adjacent local streets at Avenue M, Avenue L, Avenue K, Avenue J and Avenue G.
Within this portion of the SR-138 corridor, the Consultant shall provide identified programmatic, corridor wide, studies and services detailed herein.
In addition, Consultant shall provide Caltrans Planning Phase services for the Avenue J Interchange and Avenue L Interchange projects.
Task 1: Programmatic Studies and Services
The Consultant shall provide the following programmatic, corridor wide, studies and services as detailed in their attached proposals:
1. Traffic Forecasting
Scope does NOT include Optional Proposal Tasks 2B, 2C and 3.
2. Hydrology (EXISTING CONDITIONS)
Scope does NOT include Proposal OPTIONAL SCOPE OF WORK (BUILD-OUT) TASKS 1, 2, 3 and 4.
3. Environmental Setting/Existing Conditions
a. Community and Neighborhoods
b. Biology
c. Cultural Resources
4. Corridor Aesthetics
5. Public Outreach
Task 2: Planning Phase Services
The Consultant shall provide the following Caltrans Planning Phase services as detailed in their attached proposals:
1. Avenue J Interchange
2. Avenue L Interchange
DELIVERABLES
The Consultant shall provide to the City deliverables in hardcopy and electronic format as detailed in the attached proposals and in the Capital Engineering Division's Standards for CAD Deliverables.
ADDITIONAL AUTHORIZATION NO. 1
TASK 1, ITEM 1
TRAFFIC FORECASTING PROPOSAL
Kimley» Horn
June 25, 2014
Ms. Marissa Diaz, P.E.
Senior Civil Engineer
Public Works Capitol Engineering Group
City of Lancaster
Lancaster, CA
RE: Traffic Forecast Volumes Methodology - Measure R Program Interchanges Dear Marissa,
As we have discussed over the past few months, we propose to use the Traffic Forecast Model developed for the NW138 project (being completed by LA Metro) for the City of Lancaster (City) Measure R Program Interchange Projects. This model was created to develop a more comprehensive and integrated traffic demand forecast model for this northern most portion of the County. This required an integrated modeling approach with the latest version of the SCAG regional model (SCAG 2012 V6.1) as the foundation for the modeling process along with portion of the Kern Council of Governments (Kern COG) model.
After meeting and discussing the use of this model with the City, we plan to move forward with this approach to develop the forecast volumes for study purposes for the City's SR-138 interchange projects. We plan to provide the forecast volumes to the consultant teams for their use in their studies of the individual interchanges. This program wide approach will provide efficencies and a consistent approach to the forecast volumes in the corridor. We will work with Caltrans to gain approval of these forecast volumes at the onset of the program in order to reduce the repetition of completing these forecast volumes for each individual project, thus reducing the required submittals, reviews and approvals by Caltrans.
As we developed this specific approach to tailor the model for the purpose of providing forecast volumes for the City's interchange projects, it became apparent that a broader look at the local roadway network is also needed to plan and provide guidance for future improvements on the adjacent roadway network as well as at the interchanges. The City expressed interested in establishing this modeling approach for use in analyzing various improvement scenarios moving forward.
In an effort to define the process and the tasks necessary to complete this effort, we have worked closely with Fehr and Peers (who helped to develop the integrated model for use for the NW138 project) to further refine and develop a tool that can be used for this broader purpose of studying a significant portion of the City roadway network.
As with most tools, we need to establish the basics on what the tool will be used for and what investment is deemed appropriate for this effort. In an attempt to provide a comprehensive approach for the broader study area and provide options and create a tool for use in the future, we have asked kimley-horn.com. G60 South Fiqueroa Street. Suite 1040, Los Angeles. CA 90017 213 261 4040 Kimley» Horn Page 2
Fehr and Peers to help us develop our approach for refining the model for the City of Lancaster Measure R Program goals.
In anticipation of needing traffic count data (existing AM and PM peak hour intersection turning movements), and with City concurrence, we were able to obtain comprehensive study area wide count data prior to school being released for the summer 2014. This traffic data will be critical to being able to calibrate the existing conditions model prior to generating the forecast volumes.
A summary of the Count data collected includes:
1) Original counts completed on May 15, 2014 at City interchange ramp termini at Ave G, H, I, J, J-8, K, L, and M. These AM/PM peak hour turning count movements were completed for a total of $3,960.
2) Additional counts completed on June 3'd and 4' at 36 additional intersections as coordinated and agreed to by the City for an additional $8,910.
With the count data collected we are ready to move forward with the modeling effort once the City provides direction on the level of development wanted and needed.
The attached proposal letter provided by Fehr and Peers describes a range of options that can be considered depending on how far the City wants to develop this tool for future use. There are significant advantages to the City and the Measure R Program in developing this tool for the purposes stated.
Tasks 1, 2A and 4 are recommended to provide the future forecasts volumes for use in the near term interchange improvement projects as they move forward
Task 1 - Lancaster Model Refinements $13,200
• Task 2A - Future Traffic Forecasts $44,000
• Task 4 - Model and Forecast Report $8,800
Tasks 2B, 2C and 3 are optional tasks that will provide a more comprehensive planning tool and evaluation of priorities, needs and phasing of future roadway improvements for the City. • Task 2B - Traffic Operations Analysis for Transportation Needs Assessment, has options presented for evaluating future roadway segment and intersection improvements. This option is presented to provide a broader tool for evaluating future improvement performance. The Costs range from $37,400 to $55,000.
• Task 2C - Project Priorities & Phasing for Transportation Needs Assessment has similar options for evaluating both roadway and intersection improvement sensitivity testing to determine the ultimate need for future transportation improvements and assist in the phasing of interchange and roadway capacity improvements. The costs range from $44,000 to $57,200.
• Task 3 - Interchange Forecasts, allows the forecasts volumes to be updated at the interchanges based upon the future roadway network as determined in tasks 2B and 2C.
NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
kimley-horn.com 660 South Figuerca Street, Suite 1040, Los Angeles, CA 90017 213 261 4040 Kimley» Horn Page 3
The cost would include updates to the 5 interchanges in the Measure R program for a total of $11,000.
A cost summary is provided below:
Traffic Counts completed to date:
$3,960
: Interchange ramp termini on May 15, 2014 $8,910
Additional 36 intersection locations June 2 and 3, 2014 $12,870
Tasks 1 and 2A; future traffic demand modeling
• Task 1 - Lancaster Model Refinements $13,200
Task 2A - Future Traffic Forecasts $44,000
Task 4 - Modeling and Forecast Report $8,800
$66,000
Optional Tasks 2B, 2C &3; traffic operations analysis, sensitivity analysis, priorities, phasing and updated forecasts
Task 2B - Traffic Operations Analysis up to $55,000
Task 2C - Sensitivity Analysis, Priorities & Phasing up to $57,200 Task 3- Interchange Updated Forecasts up to $11,000
Up to $123,200
I know that the City will need to review the optional tasks in more detail and I suggest that we move forward with Tasks 1, 2A and 4 and then consider the remaining optional tasks as the City has time to evaluate the data and potential improvements.
Please let me know if you have any questions or if you need additional clarification.
Sincerely,
Kimley-Horn and Assoclates, Inc.
Pite time
Consultant Program Manager
- NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
kimley-horn.com 660 South Figueroa Street, Suite 1040, Los Angeles CA 90017- 213 261 4040
FEHR-PEERS
June 2, 2014
Mr. Robert Blume
Kimley-Horn and Associates, Inc.
660 South Figueroa Street, Suite 1040
Los Angeles, CA 90017
Reference: State Route 14 Interchange Forecasts & Future Transportation Needs Assessment Dear Bob:
We are pleased to submit this proposal to provide future travel demand forecasts for the current and upcoming interchange projects along State Route 14 (SR-14) in the City of Lancaster. This proposal also includes the development of future traffic forecasts for nearby intersections on City arterials as well as an operational assessment to identify future transportation needs. Attached please find the overall approach to the development of the future forecasts and future transportation needs assessment scope of work and cost estimate.
The cost estimate has been provided for each task as well as for two options for the future transportation needs assessment. Below is a summary of the cost estimate:
Task 1:
Lancaster Model Refinements $12,000
Task 2:
• 2A. Future Traffic Forecasts $40,000
• 2B. Future Needs Assessment $34,000 - Option 1; $50,000 - Option 2 • 2C. Transportation Network Testing $40,000 - Option 1; $52,000 - Option 2 (Forecasts & Operations for 5
Scenarios)
Task 3:
Interchange Forecasts $2,500 per location ($10,000 total for 5 I/C's) Task 4:
Documentation: Model Development & $8,000
Forecasting Report
$144,000 - Option 1
Total
$172,000 - Option 2
We appreciate the opportunity to assist you on this project. Please call me if you have any questions.
Sincerely,
FEHR & PEERS
jual Frandenberg
Saral Brandenberg
FEHR$PEERS
Travel Demand Forecasting Approach
Introduction: We are proposing to apply a systematic approach to develop traffic forecasts for the planned interchange improvements along the SR-14 corridor and major City arterials using the latest travel model developed for the area. Applying a uniformed approach to generating traffic forecasts will ensure consistency between the future forecast projections and allow the City to test the priority and phasing of improvements.
Forecasting Approach: We will utilize the travel demand forecasting (TDF) model that was recently completed for the SR-138 corridor study to develop future forecasts.
Sub-Area Model: The sub-area model is built upon the latest version of the Southern Californla Association of Governments (SCAG) 2012 RTP/SCS regional model. The model includes the northern portion of LA County, including the Cities of Lancaster, Palmdale and Santa Clarita. The sub-area model also includes the southern portion of Kern County as contained in the latest version of the KernCOG model. The extents of the model are shown below.
Sub-Area Model Boundaries
Scope of Work
Task 1 - Lancaster Model Refinements
We will meet with City of Lancaster staff to share the land use growth and roadway network assumptions contained in the sub-area model. As part of the sub-area model development, we received land use growth for Lancaster from the City. We will review these growth assumptions by TAZ with a detailed focus around the interchange locations and 8 east-west arterials providing access to the SR-14 mainline,
including the intersections shown
in the figure below.
Additional land use refinements
will be completed, as needed, to
ensure the model reflects the
future growth forecasts in the City. ...*
Are 11
In addition, we will review the
transportation network
assumptions under both the base 66.
year and future year versions of the
Air!
model and confirm with City staff
that the model reflects the existing
and future planned roadway
networks.
Recent traffic counts collected by
the City will be used to compare
the base year model forecasts to
actual counts.
Deliverable: One meeting with
City Staff; Land Use by TAZ and
Roadway Network plots for the
base year and future year sub-area Coberble War
models documented in a Technical
Memorandum for review by City
staff.
Campiola Conte
FIGURE Proposed Addillonal Count Locations
Cost Estimate: $12,000
Kimley» Horn
Study Locations for Proposed Scope of Work
Task 2 - Transportation Needs Assessment
This task will provide traffic forecasts for use in conducting a transportation needs assessment for the City of Lancaster along the SR-14 corridor and adjacent arterials. This task is seen as the first tep in developing future forecasts to be applied in the upcoming SR-14 interchange studies. Th goal of this task is to provide the City with an overall assessment of future transportation needs it the study area.
Task 2A - Traffic Forecasts for Transportation Needs Assessment The sub-area model will be used to produce future traffic forecasts for the study locations shown in the figure above:
16 ramp terminal intersections (including on/off-ramp volumes) 36 arterial intersections
SR-14 mainline segments within the City limits
The sub-area model reflects a future forecast year of 2035. Forecasts beyond 2035 (e.g., 2040), or for interim years (e.g., 2020), can be developed by applying a linear growth factor between the existing and future model forecasts. For this initial transportation needs assessment, we recommend developing and applying the 2035 traffic forecasts from the sub-area model. Existing traffic counts based on the recent data collection effort will be used to develop turning movement volumes at each of the study locations based on the growth in volumes between the base and future year models (commonly referred to as the "difference method" in travel demand forecasting).
Future traffic forecasts will be developed for the following periods:
AM peak hour turning movements at study intersections
PM peak hour tuming movements at study intersections
Peak Hour & Daily mainline segments for SR-14 within the City limits Daily roadway volumes for the 8 east-west arterials providing access to the SR-14 Deliverable: Technical Memorandum presenting future year forecasts for the 52 study intersections during the AM and PM peak hours, SR-14 mainline forecasts, and daily roadway segment forecasts for review by City staff.
Cost Estimate: $40,000
Task 2B - Traffic Operations Analysis for Transportation Needs Assessment The purpose of this sub-task is to apply the future traffic forecasts to an operational analysis tool to determine the need and priority of future transportation improvements at the study intersections and along the study corridors. We have developed two potential approaches for this task to provide the City with a range of options depending on the level of detail desired.
NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1:
Option 1: Roadway Segment Evaluation
We will use the traffic forecasts developed in Task 2A to conduct a roadway segment evaluation.
The roadway segments would consist of the 8 east-west arterials providing access to the SR-14 onducted as follows
AM and PM peak hour roadway traffic forecasts would be compared to the roadway segment capacity and freeway mainline capacity.
A volume-to-capacity (V/C) ratio would be calculated to estimate the future traffic operations along the corridor based on the number of travel lanes.
The V/C results would be used to determine the future roadway sizing needs; for example, do the future volumes result in the need for a 2-lane, 4-lane, or 6-lane roadway; or additional freeway capacity?
The three steps above would also be applied to the existing traffic volumes and current roadway capacity for use in the comparison of existing conditions to projected future operations.
This option would provide the City with a high-level needs assessment of roadway and freeway mainline sizing based on corridor volumes. It would not provide detail at the intersection level.
In addition, the need to widen a roadway is often a result of key bottlenecks along a corridor.
These bottlenecks tend to occur at major intersection locations. Therefore, although the arterial volumes along may not warrant the need to widen a roadway, intersection capacity constraints may indicate that roadway widening is needed as congestion levels increase.
Option 2: Intersection Evaluation
This option is provided to address the limitations
described under Option 1 above. Under Option 2,
we would conduct a detailed traffic operations
analysis using the Synchro software program (a
sample Synchro network is shown in the adjacent
figure). The program would be linked to the
forecasts prepared with the travel demand model
and used to test future operations, as well as
operational improvements. The analysis would be
conducted as follows:
AM and PM peak hour turning movement
forecasts would be analyzed for the 36
arterial intersections and 16 ramp terminal
intersections based on the Highway
Sample Synchro Network for Operational Analysis
NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
Capacity Manual (HCM) methodology. The HCM measures the average vehicle delay for each turning movement at an intersection, and provides delay thresholds for LOS results for both unsignalized and signalized locations.
LOS would be calculated to estimate the future traffic operations along the corridor based on the umber of travel lanes and intersection configurations. For the freeway mainline, LOS would be based on the methodology outlined in Option 1 (future forecasts compared to mainline capacity) The LOS results would be used to determine the future roadway and intersection improvements needed to accommodate future growth; for example, do the future volumes result in the need for a 2-lane, 4-lane, or 6-lane roadway?: intersection turn lane or side-street capacity improvements?; or additional freeway capacity?
The three steps above would also be applied to the existing traffic volumes and current intersection configurations for use in the comparison of existing conditions to projected future operations.
This option would provide the City with the roadway sizing results outlined in Option 1 and would provide a more detailed analysis of key intersections in the study area. In addition, the Synchro software can be used to identify key bottlenecks along a corridor that may lead to the need for additional roadway widening.
The Synchro network can be utilized by City staff, and made available for use in future City infrastructure and land development projects, such as the SR-14 interchange studies. Synchro also has a built-in simulation tool, called Simtraffic, which can be used to simulate vehicle flows along corridors and through intersections to determine vehicle queuing and storage requirements, and used to test innovative intersection treatment options, such as roundabouts.
While the above future needs assessment is intended to provide the City with the roadway capacity needs based on future growth projections, we can also help the City balance roadway capacity needs with the desire for a Complete Streets network. Widening along roadways or specific intersections envisioned as key pedestrian crossings and bicycle access locations may not be desirable by the City, and alternative capacity improvements can be explored.
Deliverable for Option 1 or Option 2: Technical Memorandum presenting existing and future raffic operations within the study area (roadway operations under Option 1 and roadway plus ntersection operations under Option 2). Meeting with City staff to review the results and discus need for testing of potential transportation network improvements as outlined in Task 3.
Cost Estimate: Option 1 = $34,000 or Option 2 = $50,000 Task 2C - Project Priorities & Phasing for Transportation Needs Assessment The sub-area model can be used to conduct sensitivity testing to determine the ultimate need for future transportation improvements and assist in the phasing of interchange and roadway capacity improvements. Based on the results of Task 2B, we will work with the City to determine NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
additional model runs needed to test the benefits of changes to the transportation network. The model runs can be used to measure the benefits of:
New roadway connections
Arterial roadway widening
sher ang improvemen ents
his task can be also be used to test the timing for partial and full buildout of interchang nprovements and to determine the priority of overall interchange improvements along the SR 14 corridor. For the purpose of the cost estimate, the scope of work assumes that up 5 model Future traffic forecasts will be developed in the immediate vicinity of the roadway network changes being tested; the model will be used to determine the % change in traffic forecasts within the study area and detailed forecasts will only be developed for those locations within the influence area (i.e., locations where a noticeable change has occurred).
Future traffic operations will be calculated for roadway and freeway mainline segments (if Option 1 above is selected) or for intersection and mainline segments (if Option 2 is selected) in the immediate vicinity of the roadway network changes being tested.
Graphics showing changes in traffic flows and traffic operations will be prepared to help the City determine the benefits of various transportation network improvements tested through the model runs (up to 5 scenarios).
We will use the results of the above transportation network testing to help the City determine the need and priority for future roadway improvements. We recommend saving the final (5) model run to complete future forecasts for the preferred roadway network scenario. This final model run can be used to develop the interchange forecasts for use in the upcoming SR-14 interchange studies as documented under Task 3 below.
Deliverable: Graphics and/or tables summarizing the changes in traffic patterns, future volume forecasts and traffic operations for up to 5 future transportation network scenarios (up to 5 model runs).
Cost Estimate: Option 1 = $40,000 or Option 2 = $52,000 Task 3 - Interchange Forecasts
Once the future roadway network is determined under Task 2, we will develop final traffic forecasts for each of the five interchanges along SR-14 for the following scenarios:
Design Year (e.g., 2040) AM and PM peak hours and Average Daily Traffic (ADT) Construction Year (e.g., 2020) AM and PM peak hours and ADT NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1-
The design and construction horizon years will be confirmed with the project team prior to the development of future forecasts. The sub-area model reflects a future forecast year of 2035.
Forecasts beyond 2035 (e.g., 2040), or for interim years (e.g., 2020), can be developed by applying a linear growth factor between the existing and future model forecasts. The traffic forecasts will be reported for the SR-14 mainline, on- and off-ramps, and turning movements at the ramp Deliverable: Technical Memorandum presenting design and construction year forecasts for each of the five interchanges for the AM and PM peak hours along with ADT for review by City staff.
Cost Estimate: $2,500 per interchange ($10,000 total for the 5 interchanges) Task 4 - Documentation
A Model Development Report will be prepared to reflect the final deliverables produced under Tasks 1-3 above. The Model Development Report will document the sub-area model assumptions, including the land use growth, roadway network, and model calibration within the area encompassing the five interchanges in the City of Lancaster. The report will also contain the traffic forecasts for the planned interchanges along the SR-14 corridor. This report can be used for the Caltrans review and approval process for each interchange project.
Cost Estimate: $8,000
ADDITIONAL AUTHORIZATION NO. 1
TASK 1, ITEM 2
HYDROLOGY PROPOSAL
Kimley» Horn
November 6, 2014
Ms. Marissa Diaz, P.E.
Senior Civil Engineer
Public Works Capito: Engineering Group
City of Lancaster
Lancaster, CA
RE: Drainage Master Study (revised) - Measure R Program Interchanges Dear Marissa,
As requested, Penfield and Smith updated their proposal to include the optional services as outlined in their attached proposal. The attached proposal for completion of a Master Drainage Study for the City of Lancaster (City) Measure R Program Interchange Projects now includes optional services to expand the study to consider build out, if requested by the City. This study will address existing hydrology data for the SR-14 corridor and adjacent areas. This study is intended to provide the baseline drainage information for the corridor so that the study does not need to be replicated for each specific interchange project.
The information will be provided to each interchange design team so that existing flows wi!l be determined by the City on the front end and not have to be confirmed with each interchange project.
This program wide approach will provide efficiencies and a consistent approach to the existing hydrology and drainage conditions in the corridor. We will work with Caltrans to gain approval of the Master Drainage data thus reducing the repetition of completing these studies for each individual project and reduce the required submittals, reviews and approvals by Caltrans.
We propose to have Penfield & Smith complete this study as part of the original program management team. They have unique qualifications and have worked on drainage Improvements throughout the City.
The cost of the Base Project Scope will not exceed $62,260 and will be completed per the scope of ervices provided in Penfield and Smith's attached proposal. The optional services to analyze fl Lild out conditions is also provided in the attached scope can be completed for an addition $42,460. Total services for the Base Project Scope and Optional Future Build-out Conditions will not exceed $104,720
Please let me know if you have any questions or need any additional information.
Sincerely,
Kimley Horn and Associates, Inc.
Robert Biema.
Consultant Progran Manager
NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
kimiey-horn.com 860 South Fiqueroa Street. Suite 1040, Los Angeles, CA 90017 213 261 4040 Penfield & Smith
42225 10th Street West
Suite 111
Lancaster, CA 93534 W.O. 20956.05
September 17, 2014
tax 681-348-6573
www.penfieldsmith.com Robert Blume, P.E.
Kimley-Horn and Associates, Inc.
600 South Figueroa Street, Suite 1040
Santa Barbara Los Angeles, CA 90017
amarilla
anta Mar
incast
Subject: Measure R SR-138 (SR-14)
Master Drainage Study
Dear Mr. Blume:
Civll Eng' eering
Land Surveying As requested by the Kimley-Horn, Penfield & Smith (P&S) appreciates the Land Use Planning opportunity to submit this proposal for engineering services for the above referenced project. P&S has a strong background in Water Resource with Canteen: & Inspecton several experienced staff members capable of performing this type of work. As you explained during our recent phone conversation, it is the intent of the City of Traffic & Transportation Lancaster to complete a Master Drainage study of existing conditions to support Engtreering the Measure R funded projects. The projects include interchanges along the Transportation Planning Antelope Valley Highway (SR-14 and SR-138) at Avenue's G, K, J, L and M.
Structural Englisering
Water Resources UNDERSTANDING OF PROJECT REQUIREMENTS
Engineering
t is understood that the purpose of the Master Drainage study is to provide GIS baseline analysis for the different project consultants that will complete the Repoinary and final design. It will also be incorporated into the Project Study The Antelope Valley has drainage facilities for four separate jurisdictions that may contribute flows along the project corridor. These include City of Lancaster, City of Palmdale, County of Los Angeles and Caltrans. Although there are jurisdictional boundaries, P&S has a great working relationship with all of them which will lead to a collaborative effort on sharing of information.
A project of this type can be approached very differently and is dependent on the use of the data in the future. One method is to gather new data throughout the entire area and develop a new hydrologic model. Although there might be significant benefits in this approach, it is very costly and | believe not warranted.
As an alternative P&S will gather as much existing information as available and validate and/or correct stormwater flows by using current tools and methodologies. Such tools and methodologies include the Los Angeles Counties LAR-'AC data and Natlonal Hydrography Dataset.
Robert Blume
September 17, 2014
With the above in mind the following scope of work has been prepared.
SCOPE OF WORK (EXISTING CONDITION)
Task 1 - Project Administration Management and Coordination a. Maintain project quality control and coordination of various sub-consultants as required throughout scope of work;
b. Attend kick-off meeting to refine project scope and schedule; c. Attend monthly project status meetings 2 anticipated; d. Research all information pertinent to the project such as records and documents in order to complete the project;
e. Review available record drawing information for the existing storm drain system that traverses Antelope Valley Highway SR-14;
1. Preparation of e-mail monthly project status memo, review of project expenses and monthly invoicing.
Task 2- Project Research and Review
a. Request from the City of Lancaster, City of Palmdale and Los Angeles County hydrology reports affiliated with the cities master plan drainage facilities; b. Request storm drain Record Drawing information from the City of Lancaster, City of Palmdale, Los Angeles County and Caltrans for facilities that cross SR-14; c. Request storm drain atlas maps from the City of Lancaster, City of Palmdale and Los Angeles County:
d. Review the reports and record drawings identified within Task 2; e. Request and review Digital Elevation model information from the City of Lancaster associated with the latest LARIAC data;
f. Obtain soil information from the NRCS Soil Surveys;
g. Request and review Street and Storm Drain Plans for tracts upstream of SR-14 crossing. (This task would be used in the evaluation of storm flows and time of travel concentrations);
h. Request latest available land use map to be provided in ARCGIS format; i. Perform a field investigation to document existing facilities that cross SR-14 (SR-138).
This is a visual investigation and not survey grade.
Task 3 - Existing Hydrology Analysis
a. Delineate sub-watershed boundaries within the City of Lancaster; b. Determine percent imperviousness for each sub-watershed; c. Determine the hydrologic soil type within each sub-watershed; d. Develop Time of Travel and Time of Concentration runs for each sub watershed:
e. Input upstream flows from the City of Palmdale Master Plan of Drainage report; f. Use WMS with MODRAT interface to develop hydrographs for each sub-basin and use routing tools to determine stormwater flows for the 10-yr, 25-yr and 50-yr events; Robert Blume
September 17, 2014
Task 4 - Technical Report
a. Compile hydrologic data input and output runs for each evaluate rainfall frequency event.
This data may be presented in summary tabular form with actual data runs provided digitally, as needed;
b. Prepare drainage exhibits maps to correspond with the developed sub-watershed ›asins. It is anticipated that exhibits will be presented at a scale of 1"=2000' on 24"x36' sheets. Scale may be adjusted for readability as determined by P&S. Attend kick-oft meeting to refine project scope and schedule. Some exhibits may be schematically represented if warranted;
Prepare a Technical Report, containing information such as; Background, Scope of Work, Study Approach, Watershed Description, Basis of Evaluation, Methodology and Results. It is anticipated that a Draft and Final version of the report will be required; Task 5- Deliverables
a. Five print copies of Draft Report and one PDF version. b. Five print copies of Final Report and one PDF version. c. Editable CAD map files on CD. CAD files to be per Capital's CAD Deliverables Standards.
d. Editable electronic copies of all calculation files
OPTIONAL SCOPE OF WORK (BUILD-OUT)
Task 1 - Project Administration Management and Coordination a. Maintain project quality control and coordination of various sub-consultants as required throughout scope of work;
b. Research all information pertinent to the project such as records and documents in order to complete the project;
c. Preparation of e-mail monthly project status memo, review of project expenses and monthly invoicing.
Task 2 - Project Research and Review
a. Request from the City of Lancaster future Landuse Build-out Conditions and General Plan document;
b. Review the General Plan and future landuse report within Task 2; c. Request latest available future land use map to be provided in ARCGIS format; d. Review the current Master Plan of Drainage.
Task 3 - Build Out Hydrology Analysis
a. Review and update based on bulld out the following items from the existing conditions:
i. Delineated sub-watershed boundaries within the City of Lancaster; ii. Percent imperviousness for each sub-watershed;
ili. Hydrologic soil type within each sub-watershed;
iv. Time of Travel and Time of Concentration runs for each sub watershed; V. Input upstream flows from the City of Palmdale Master Plan of Drainage report for build out conditions:
NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
Robert Blume
September 17, 2014 NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
vi. Use WMS with MODRAT interface to develop hydrographs for each sub-basin and use routing tools to determine stormwater flows for the 10-yr, 25-yr and 50- yr events;
Task 4 - Technical Report
a. Compile hydrologic data input and output runs for each evaluate rainfall frequency event.
This data may be presented in summary tabular form with actual data runs provider digitally, as needed;
b. Prepare drainage exhibits maps to correspond with the developed sub-watershed basins. It is anticipated that exhibits will be presented at a scale of 1"=2000' on 24"x36" Scale may be adjusted for readability as determined by P&S. Attend kick-off meeting to refine project scope and schedule. Some exhibits may be schematically represented if warranted;
c. Prepare a Technical Report, containing information such as; Background, Scope of Work, Study Approach, Watershed Description, Basis of Evaluation, Methodology and Results. It is anticipated that a Draft and Final version of the report will be required; d. Provide recommendations for updates and associated estimated costs to the current Master Plan of Drainage. The recommendation will include any upsizing, downsizing, or conveyance change.
SERVICES NOT INCLUDED
The following services and all other services not specifically listed herein are excluded:
1. Governmental and public agency fees, cost of bonds and taxes.
2. Initial Study, CEQA Review, Cultural, Biological, and Environmental Studies.
3. Acquiring Rights of Way and preparing documents for acquiring of such Rights of Way.
4. Right-of-way and boundary determination/establishment, setting monuments and filing maps.
5. Research and field location/verification of section corners or intersection monuments.
6. Title Company research fees.
7. Hydrology calculations for future conditions.
8. Services by consultants other than P&S.
CLIENT TO PROVIDE
Client or co-consultant at Client's direction shall provide the following items to Penfield & Smith;
1. Atlas maps
2. Record Drawings
3. LAR-IAC dataset for aerial imagery and topographic elevation data
4. Existing Master Plans of Drainage
PROPOSED FEE AND METHOD OF PAYMENT
Our proposed services will be performed on a time and materials basis and shall be billed monthly at the rates then in effect. Charges for "time" include professional, technical and clerical support services provided by Penfield & Smith. "Materials" include all reimbursable Robert Blume
September 17, 2014
expenses, such as photocopies, postage, shipping/delivery, mileage, plots, prints, maps/documents and outside consultant fees.
Payment is due on receipt of statements (net 30 days). Unpaid account balances are subject to a finance charde which will be the lesser of one and one-half percent (1 ½ %) per month or a nonthly charge not to exceed the maximum legal rate. This fee shall be applied to any unpaid balance commencing thirty days after the original billing. If an account is unpaid and would be subject to a finance charge, we may consider this as constructive notice to suspend work.
Based on our understanding of your requirements and our experience with similar projects, we estimate that the fee required (Base Project Scope) for our services will be approximately $56,600, including reimbursable allowance of $1,600.
Our estimated for the Additional Optional Scope for Future Build-out Conditions is $38,600 for a total project estimate of $95,200.
We have estimated the cost of our services based on our understanding at this time of the scope and complexity of the work. However, please note that our services will be performed on a time and materials basis, and it is possible that our actual charges could exceed the amount we have estimated. During the performance of our services, the need for additional or expanded services may be determined. We will make every reasonable effort to keep you informed of our progress and costs incurred.
ADDITIONAL SERVICES
Services performed outside the scope of this agreement require written approval prior to performance of the work. Design changes by Owner/Client or designee after the start of design shall be considered additional services. Any work requested by Owner/Client that is outside the scope of this agreement will be identified by Penfield & Smith as such, and a fixed fee or not-to- exceed amount will be agreed upon prior to the start of the additional work. Compensation for additional services shall be in accordance with Exhibit "A", Penfield & Smith's Billing Rate Schedule currently in effect.
TIME OF PERFORMANCE
Based on our current workload, we estimate that the first draft of the drainage study report can be submitted in approximately 16 weeks following execution of task order. It is expected that review comments will be received by Kimley-Horn and the City of Lancaster. A final report will be submitted within 4 weeks following written receipt of comments.
INDEMNIFICATION ADVISORY
In recent years, we have seen a movement towards clients requesting us to perform services under their company's form of Agreement. Please be advised that if you would like us to work under your company's form of Agreement, we will look closely at the required indemnification language in any such document. Specifically, we will not accept indemnification language that requires us to accept liability for other than our negligent acts of error or omission to the extent that we are responsible for such liabilities. This proposal is based on this understanding.
Robert Blume
September 17, 2014
AUTHORIZATION
Should you require additional information or wish to discuss this proposal further, please give me a call. My direct line is (661) 949-6676, extension 102. If the proposal is satisfactory, please Thank you for considering Penfield & Smith for this project.
Very truly yours,
PENFIELD & SMITH
Cataun Sever Those Dan
Autumn Glaeser Thomas O. Rowe, PE
Senior Engineer/Project Manager Principal Engineer/QCM
RCE 76574 RCE 56070
Enclosures
W:lwork120000-20999\20956\05 - Master Drainage for Corridor\20956_05ProV3.docx PS
REUSED MASTER PLAN OF DHAINAGE MAP REVISED MASTER FLAN OF DRAINAGE MAF seer 2205)
TENTION
-
,кСс 470.
REVISED MASTER PLAN OF BRAINACE MAP U REVISED MAS PLAN OF DRAINAGE NAP comm
DRAINS MAMA
GENERAL ED ANALYS MIRA
ONLY
PROJECT COST ESTIMATE (WITH PREVAILING WAGES) OPTIONAL SCOPE - BUILD OUT PENFIELD & SMITH Project No.: 20956.05 42225 10th Street West, Sulte 119 Description: Measure R SR-138 Master Drainage Study Lancaster, CA 93534 Kim/ey-Hom & Associates (661) 849-6676
20956 05FeeEstV2.xisx Prevailing Wages (yin.):
Hours
Engineer Enpinser Enginear Tech TOTAL LABOR
TASK Principal Serdor l Assist Il Support HOURS COST
Project Administration
Qually Control
Research Project Records
Project Status Memo Preparation IN 380
Project Research
Recuest reports documents 460
Request and review Future Landuse
Buld-Out Hydrology
Watershed Delineation 3320
Estimate percent imp. per WS 3320
Soi Type Determination per WS 3320
Develop TC calculations 4600
Coordinate upstream values from Paimdale 1020
Develop hydrograhs 7920
Technical Report
Complie input and output runs 1280
Prepare drainage map exhibits 5040
Prepare Draft and Final Report 4680
TOTALS
Classificalicn $/hr Classification Expenses Biling. Reimbursables Consultant Factor
Prisopai Engineer - 190.00 So Rest
Senior Engineer l 160.00 Geologic Report 1.15
Assistant Engineer Il 125.00 Tila Report 1.15
Technical Suppart 75.00 Construction Staking 1,15
Blueprints 1.15
1.15 1.15 00000c
relephone 1.15
Photocopies 1.15
Photographs 1.15
Averaga Rate: 156.235
Grand Total = $38,590
ADDITIONAL AUTHORIZATION NO. 1
TASK 1, ITEM 3
ENVIRONMENTAL SETTING/EXISTING CONDITIONS PROPOSAL
Kimley» Horn
January 10, 2015
Ms. Marissa Diaz, P.E.
Senior Civil Engineer
Public Works Capitol Engineering Group
City of Lancaster
Lancaster, CA
RE: Corridor Environmental Studies - Measure R Program Interchanges Dear Marissa,
As we have discussed over the past few months, we propose to complete a Corridor Environmental studies to support the environmental documents for the City of Lancaster (City) Measure R Program Interchange Projects. These studies will address existing conditions for each of the interchanges and adjacent areas. These studies are intended to provide the baseline existing conditions information for the corridor so that the studies do not need to be replicated for each specific interchange project.
We are proposing to complete the Existing Conditions Reports for communities and neighborhoods, biology, and cultural resources for each of the five interchanges in the corridor. The purpose of the Existing Conditions Reports will be to identify existing resources and constraints early in the Project Approval/Environmental Document (PA/ED) phases of the projects and to reduce delays of collecting the data later in the process. Identifying resources and constraints early in the design process will allow the design teams to avoid or reduce impacts on existing resources to the extent feasible, thereby reducing time and cost associated with agency consultation and mitigation; and to identify and take advantage of early seasonal survey requirements and constraints and not miss these critical survey windows.
Information included in the Existing Conditions Reports will be used to support the CEQA technical studies for each of the interchanges and will provide a baseline for the SR-138/SR-14 corridor. The Existing Conditions Reports will also be used to create a consistent inventory throughout the corridor that would be used in the technical studies for the PA/ED phase of each of the projects.
The information will be provided to each interchange design team so that existing conditions will be determined by the City on the front end and not have to be confirmed with each interchange project.
This program wide approach will provide efficiencies and a consistent approach to identifying the existing resources in the corridor. We will work with Caltrans to gain approval of the Existing Conditions Reports thus reducing the repetition of completing these studies for each individual project and reduce the required submittals, reviews and approvals by Caltrans.
We propose to have GPA Environmental complete these studies as they are part of the original program management team. They have unique qualifications and have worked with Caltrans District 7 environmental staff on numerous projects. This knowledge and familiarity with Caltrans requirements will help to maintain consistency in the information provided to the consultant teams for kimiey-horn.com 660 South Figueroa Street, Suite 1040, Los Angeles, CA 90017 213 261 4040 Kimley» Horn Page 2
use in their technical studies. Rich Galvin will lead the efforts for GPA Environmental and is committed to supporting the program to successful completion.
The cost of the Existing Conditions Reports for communities and neighborhoods, biology, and cultural resources will not exceed $143,617 and will be completed per the scope of services provided in GPA Environmental attached proposal.
An option to complete the Historic Resources is also provided. This most likely will be different for each project and it can be completed efficiently by each consultant team and not proposed at this time.
Please let me know if you have any questions or need any additional information.
Sincerely.
Hey-Horn and Assaciates, Inc.
Shut thine
Robert D. Blume, P.E
Consultant Program Manager
kimley-horn, com 660 South Figueroa Street, Suite 1040, Los Angeies, CA 90017 213 261 4040
CONSULTING
GP A
January 27, 2015
Robert Blume, Project Engineer
Kimley-Horn and Associates
11919 Foundation Place
Suite 200
Gold River, CA 95670
Subject: Existing Conditions Reports for the Measure R "Highway Equity" (Measure R) Program Dear Mr. Blume:
GPA Consulting is pleased to submit this proposed scope of work to prepare existing conditions reports for the above-referenced project. The attached scope of work has been prepared based on the project information provided by Kimley-Horn and Associates and found in the project RFQ. GPA is available to commence work on these tasks immediately, once approved by Kimley-Horn and Associates.
The purpose of the Existing Conditions Reports is to identify existing resources and constraints early in the environmental process, and to reduce delays later in the process. Identifying resources and constraints early in the environmental process will allow the design team to avoid or reduce impacts on existing resources to the extent feasible, thereby reducing time and cost associated with agency consultation and mitigation; and to identify any seasonal survey constraints and consultation requirements early on to allow for sufficient time in the schedule. Information included in the Existing Conditions Reports would also be used to support the CEQA technical studies, and to provide a baseline picture of the SR-138/SR-14 corridor. Existing Conditions reports will also give a consistent analysis throughout the corridor, thereby reducing cost and expediting schedule. The Existing Conditions Report would also be used to create a consistent inventory throughout the corridor that will be used in the technical studies for the PA/ED phase of the project.
Sincerely,
Techand Salver
Richard Galvin, Vice President
GPA Consulting
231 california streer el segundo co 90245 1 310.792.2090 1310.792.2690 SCOPE
GIPA
GPA SCOPE OF WORK
Existing Conditions Reports
For the
Measure R "Highway Equity" (Measure R) Program
1. PROJECT UNDERSTANDING
The City of Lancaster (City) has selected Kimley-Horn and Associates (KHA) as the Program/Project Management consultant for the City Measure R "Highway Equity" (Measure R) Program being managed by the City. The Metropolitan Transit Authority (MTA) Planning and Programming Committee, on September 19, 2012, approved Measure R funds for multiple capacity-enhancing projects along State Route 138 (SR-138), which overlaps with SR-14 within the project areas.
As part of the program, the City, in cooperation with the California Department of Transportation (Caltrans) and the MTA, is planning to modify the geometry and/or capacity of five interchanges, including the following:
• SR-138/SR-14 and Avenue G Interchange (City, Caltrans, and County of Los Angeles jurisdiction) • SR-138/SR-14 and Avenue J Interchange (City and Caltrans jurisdiction) • SR-138/SR-14 and Avenue K Interchange (City and Caltrans jurisdiction) • SR-138/SR-14 and Avenue L Interchange (City and Caltrans jurisdiction) • SR-138/SR-14 and Avenue M Interchange (City, Caltrans, County of Los Angeles, and City of Palmdale jurisdiction)
Improvements may include interchange modifications and modifications to local intersecting roadways up to a half mile east and west of the interchanges. Modifications may include widening overcrossings over the existing SR-138/SR-14, interchange geometric enhancements, traffic signals or other traffic control improvements, landscaping, pedestrian and cycling improvements, and other context sensitive solutions (CSS).
Caltrans has been identified as the California Environmental Quality act (CEQA) lead agency for the interchange improvements; therefore, Caltrans is required to determine whether the project could have a significant impact on the environment and incorporate measures to minimize or mitigate impacts to the extent feasible.
As part of the environmental evaluation process, KHA has requested that GPA prepare a scope of work to complete Existing Conditions Reports for community, biology, and cultural resources at each of the five interchanges. The purpose of the Existing Conditions Reports is to identify existing resources and constraints early in the Project Approval/Environmental Document (PA/ED), and to reduce delays later in the process. Identifying resources and constraints early in the design process will allow the design team to avoid or reduce impacts on existing resources to the extent feasible, thereby reducing time and 231 calfornia street el secundo co 90245 1 310.792.2090 1.310.792.2696 SCOPE
GIP A
cost associated with agency consultation and mitigation; and to identify any seasonal survey constraints and consultation requirements early on to allow for sufficient time in the schedule. Information included in the Existing Conditions Reports will also be used to support the CEQA technical studies, and to provide a baseline picture of the SR-138/SR-14 corridor. The Existing Conditions Reports will also be used to create a consistent inventory throughout the corridor that would be used in the technical studies for the PA/ED phase of the project.
Il. SCOPE OF WORK
TASK 1: EXISTING CONDITIONS REPORTS
GPA will perform background research, field surveys, and will prepare an Existing Conditions Report for each of the resource areas discussed below to identify design constraints, required surveys and consultation, and serve as a basis for future environmental studies. Each report will include a description of the relevant existing conditions in each of the interchange study areas, as well as any existing environmental constraints that could affect project design, schedule, or cost and any additional required steps to achieve CEQA approvals. The reports will be supported by mapping and any other relevant exhibits or references. GPA will prepare the reports in a format acceptable to the City, and will submit the draft reports to the City for review and comment. GPA will then Incorporate comments from the City and finalize the document.
Project Management and Meetings
During preparation of each report, GPA will maintain a clear line of communication with KHA, and will conduct regular status checks to ensure all tasks are on schedule and within budget. GPA will prepare a monthly progress report for each task that includes the progress of each task, new and ongoing issues, proposed resolutions, and estimated impact on the schedule. GPA will attend project meetings during preparation of the existing conditions reports, either in person or via conference call. Up to four project meetings are anticipated for each report.
Project Initiation
After receiving notice to proceed, GPA will coordinate with KHA to gather a sufficient level of information on the proposed project to prepare an initial project description (purpose/need and an outline of general project features) and delineate a study area for each of the environmental disciplines.
The study area may vary for different resource areas, depending on what is being assessed.
Task 1.A Communities and Neighborhoods
Researching existing conditions related to communities and neighborhoods surrounding the five interchanges will assist in identifying any potential constraints related to land use, community concerns, flood hazards, farmlands, or other community issues that could require design consideration, result in project delays, or that may require additional study or coordination. 231 califomia sneet, el segundo ca 90245 1. 310.792.2590 I.310 792 2696 SCOPE
Q FA
Land Use, Zoning, and Special Designations
GPA will obtain Information regarding existing land uses within and near the project area by completing windshield surveys, reviewing land use plans and zoning codes, and reviewing maps of the project area and surroundings. GPA will compile this information and provide a summary of existing and future land uses and zoning designations; applicable state, regional, and local land use plans; adjacent residential neighborhoods and business districts; community character and cohesion; 100-year special flood hazard areas; and farmlands of statewide importance and timberlands for each of the five interchange study areas.
Population, Housing, and Communities
Under CEQA, if a social or economic change is related to a physical change, then social or economic change may be considered in determining whether the physical change is significant. Since this project would result in physical changes to the environment, it is appropriate to consider changes to community character and cohesion in assessing the significance of the project's effects. As part of the development of this project scope, GPA performed preliminary research of social and economic data from the United States (U.S.) Census Bureau. Based on this research, GPA has determined that the project could result in social and economic changes.
GPA will obtain information on the existing community setting within and near the project area by completing windshield surveys, reviewing regional planning documents and general plans, and performing a geographical search using 2010 U.S. Census Bureau data and Geographic Information Systems (GIS) data. GPA will compile this information and provide a summary of parks, recreational areas, emergency services, schools and other community facilities; and population, housing, and economic conditions for each of the five interchange study areas.
Existing Conditions Report
GPA will prepare a summary of the results of these studies in the Communities and Neighborhoods Existing Conditions Report, which will discuss each of the five interchange study areas separately. The summary will include a discussion of the study methodology, regulatory requirements, existing setting and resources, research results, and supporting maps. The report will also outline any future surveys, analysis, and consultations that may be required with resource agencies to obtain project approvals and environmental permits. Relevant attachments will be included.
Deliverables: One electronic copy and up to three hard copies of the Communities and Neighborhoods Existing Conditions Report; monthly progress reports
Task 1.B Biological Resources
Researching existing conditions related to biological resources surrounding the five interchanges will assist in identifying any potential constraints related to sensitive resources that could require design consideration or avoidance, result in project delays, or that may require additional study, consultation, permitting, and/or mitigation. In addition, completing biological surveys up front will allow for 231 calfornia steer el segundo co 90245 | 310.792.2690 1.310.792.2696 SCOPE
GP A
completion of one of two seasons required for the Caltrans Natural Environment Study and will facilitate the ability to exclude species from further consideration.
Background Research and Mapping
GPA will review available data on biological resources recorded within and near each of the five interchange study areas, including all plant and animal species with the potential to be in the project area. This review will include conducting searches in databases such as the California Natural Diversity Database (CNDDB) and the National Wetlands Inventory (NWI). Additionally, a list of protected species with the potential to be in each of the study areas will be requested from the U.S. Fish and Wildlife Service (USFWS). Existing studies completed near each of the study areas will also be referenced, including applicable planning documents. GPA will utilize this background data and project design plans to delineate the Biological Study Area (BSA) for each of the five interchanges, which will be used as the boundary for field surveys and the Existing Conditions Report.
Field Surveys
GPA will survey the BSA for potential wildlife, their signs, and/or potential habitat. GPA will inventory all botanical, aquatic, and wildlife resources observed in the BSAs. GPA will identify and record all existing vegetation communities in the area. Botanical surveys will be conducted during the blooming period for special-status plants with potential to be in the project area (April and May), where feasible. The limits of potentially jurisdictional areas, including waters of the U.S. and waters of the state, will be identified based on appropriate criteria including the ordinary high water mark (OHWM), edge of channel banks, and riparian boundaries. Based on preliminary research, it appears that there may be jurisdictional areas in portions of the drainage channel east of SR-14.
Existing Conditions Report
GPA will prepare a summary of the results of these studies in the Biological Resources Existing Conditions Report, which will discuss each of the five interchange study areas separately. The summary will include a discussion of the study methodology, regulatory requirements, existing setting and resources, research results, supporting maps. The report will also outline any future surveys, analysis, and consultations that may be required with resource agencies to obtain project approvals and environmental permits. Relevant attachments will be included.
Deliverables: One electronic copy and up to three hard copies of the Biological Resources Existing Conditions Report; monthly progress reports
Task 1.C Archaeological Resources (SRI - Archaeological Sub Consultant) Researching existing conditions related to archaeological resources surrounding the five interchanges will assist in identifying any potential constraints related to resources that could require design consideration or avoidance, result in project delays, or that may require additional study or consultation and/or mitigation.
231 colomio stredi el segundo co 90245 : 310.792.2690 1310?92 2096 SCOPE
GIPA
Native American Coordination
SRI will conduct preliminary Native American coordination as part of the information-gathering process.
SRI will contact the Native American Heritage Commission (NAHC) for a list of traditional-use areas or sacred sites within and near each of the interchange study areas and for a list of specific Native American groups or individuals who may have knowledge of Native American resources in any of the study areas. The contacts list will be available for use during later stages of work. Because the proposed project is in the preliminary planning stages, SRI does not anticipate initiating contact with groups or individuals named by the NAHC as part of the proposed work.
Background Research
Background research will involve records searches at the SCCIC at California State University, Fullerton, to identify all known cultural resources previously recorded in each of the study areas and surrounding one mile. It will also involve brief archival research related to the history of area. SRI will request the record search and archival research, and will conduct a brief review of pertinent geological literature to evaluate the potential for significant buried archaeological resources to be in each of the study areas.
The background research will be used to help identify cultural resources in the study areas and determine the sensitivity of the study areas for buried archaeological resources.
Field Surveys
SRI will conduct an intensive survey of the each of the study areas and record all identified cultural resources. The study areas are located in a highly developed area, and surface visibility in many areas is expected to be poor. Fieldwork will involve inspecting any exposed ground surface in the study areas for evidence of archaeological deposits. Photographs will be taken to document the degree of development within the study areas. SRI will exclude private lands and other areas with access issues from the survey.
Because of the developed nature of the study areas, SRI assumes that no more than three archaeological resources will be found during survey. If resources are found, site recording will involve Global Positioning System mapping of site boundaries, surface features, and a sample of surface artifacts. A narrative site description will be prepared to characterize the appearance, integrity, and boundaries of each property.
Existing Conditions Report
GPA will prepare a summary of the results of these studies in the Archaeological Resources Existing Conditions Report, which will discuss each of the five interchange study areas separately. The summary will include a discussion of the study methodology, regulatory requirements, existing setting and resources, research results, supporting maps. The report will also outline any future surveys, analysis, and consultations that may be required with resource agencies to obtain project approvals and environmental permits. Relevant attachments will be included.
Deliverables: One electronic copy and up to three hard copies of the Archaeological Resources Existing Conditions Report; monthly progress report
231 colomma sreet, el seedo co 90245 : 310.792.2090 131C 792 2090 SCOPE
GPA
Task 1.D (Optional Task) Historic Resources
Researching existing conditions related to historic resources surrounding the five interchanges will assist in identifying any potential constraints related to resources that could require design consideration or avoidance, result in project delays, or that may require additional study or consultation and/or mitigation.
Field Surveys
GPA architectural historians will conduct a site visit and identify properties that are more than 45 years old and that would require evaluation for historic significance. GPA will photograph each property and take notes on the character defining features, alterations, and aspects of integrity for use in preparing state inventory forms.
Historical Research
GPA will conduct general and property specific research to assist in resource identification. The general research will be conducted on the City of Lancaster and the immediate area to develop a historic context. Property specific research will be used to evaluate prior events, persons, or architects associated with the properties. Research will be conducted at the local library, historical societies, Assessor's office, building department, and online resources. The materials that will be reviewed will include historic maps and photographs, building permits, written histories, newspaper articles, biographies, obituaries, etc., as available and relevant to each property being evaluated.
Property Evaluation
GPA will prepare a State of California Department of Parks and Recreation inventory form (DPR523 A - Primary Record and BSO form) for each building, structure or object that is more than 45 years old that is within any of the five interchange study areas. The DPR forms will include a photograph and description of the property, description of alterations, ownership Information, and an assessment of integrity. The BSO form will include an evaluation of the property against the criteria for the National Register of Historic Places and the California Register of Historical Resources and will assign a recommended status code.
Existing Conditions Report
GPA will prepare a summary of the results of these studies in the Historic Resources Existing Conditions Report, which will discuss each of the five interchange study areas separately. The summary will include a discussion of the study methodology, regulatory requirements, existing setting and resources, research results, supporting maps. The report will also outline any future surveys, analysis, and consultations that may be required with resource agencies to obtain project approvals and environmental permits. Relevant attachments will be included.
Deliverables: One electronic copy and up to three hard copies of the Historic Resources Existing Conditions Report; monthly progress report
23: californio steer, el segundo ca 90245 1 010.792.2090 |.310.792.2696, SCOPE
G A
Ill. ASSUMPTIONS
This scope has been prepared based on the following assumptions:
• GPA will discuss each resource area in separate documents; each of the would be discussed separately in each report.
• The scope provided does not include analysis related to the National Environmental Policy Act (NEPA). If analysis related to NEPA is required, an additional scope of work would be prepared. • If the project is revised in a manner that results in additional efforts to analyze an expanded study area, an additional scope of work would be prepared.
• An adequate level of information will be provided on the project design to delineate a study area for each interchange that will be sufficient for the Existing Conditions Reports. • Site access will be provided to allow surveys to be conducted within the entire study area for each of the five interchanges.
• An appropriate level of design will be provided to develop project mapping. • Focused special-status species surveys are not included in this scope of work. • No more than 14 inventory forms will be required for the historic resource studies. • The records search boundary includes a 1-mile buffer around all project components. • No more than three archaeological resources will be found during survey, and archaeological evaluations are not included in this scope of work.
• Rights of entry and Caltrans Encroachment Permit will be provided by the City or KHA. 231 callomia stect el segundo co 90245: 310.792 2690 f310 792,2096 Project Budget:
Lancaster SR 138/SR 14 Interchange Improvements
January 27, 2015
Amount Task Subtolal
SA6.0B0.00
Task 1.B: Biological Resources
$57,400.00
Task 1.D: (Optional) Historic Resources
Richard Galvin - Principal Env. Planner $210.00 $5.040.00 Andred Gaivin- Principal Arch. Historian $180.00 $2.160.00 Erinn Peterson - Senlor Environmental Planner $150.00 $1.200.00 Laura O'Neill - Senior Architectural Histortan $150.00 $24.000.00 Marleka Schrader - Senior Bologist/Env. Planner $150.00 $1.200.00 Task Subtotal $33,600.00
Total Services 1,064.00 $137,080.00
Expense Budget: Units Amt Mkup
SRI (Task 1.C- SRI Archaeological Resources) 1.00 $15,568.00 10% $17,124.80 Report Copies 15.00 $15.00 $225.00
Lodging 16.00 $210.00 $3,380.00
Mileage 1,020.00 $0.56 $571.20
Research Foos (GIS/Census Data) 1.00 $800.00 $800.00
Research Fees (Task 1.C- SRI Archaeological Resources) 1.00 $5,000.00 $5,000.00 Total Expenses $27,081.00
Total Service: $137,080.00
Total Expense: $27,081.00
Grand Total: $164,161.00
ADDITIONAL AUTHORIZATION NO. 1
TASK 1, ITEM 4
CORRIDOR AESTHETICS PROPOSAL
Kimley» Horn
June 11, 2014
Ms. Marissa Diaz, P.E.
Senior Civil Engineer
Public Works Capitol Engineering Group
City of Lancaster
Lancaster, CA
RE: Aesthetic Framework Guidelines - Measure R Program Interchanges Dear Marissa,
As we have discussed over the past few months, we propose to complete a study to develop Aesthetics Framework Guidelines for the City of Lancaster (City) Measure R Program Interchange Projects and adjacent corridors. This effort is intended to provide the framework for the projects that will be developed as part of these interchange projects as well as other corridor improvement projects that will follow.
Once developed, the guidelines will be provided to each interchange design team for use during the development and implementation of the individual projects. This corridor wide approach will provide efficiencies and consistent themes and techniques that will be used by all the design teams. We will work with Caltrans to gain approval of the framework concepts in order to reduce the repetition of completing these studies and approvals for each individual project, which will reduce the required submittals, reviews and approvals by Caltrans.
We propose to have Sargent Town Planning complete these Framework Guidelines. They have unique qualifications and have worked with the City in developing the City's Corridor Plan and improvements along Lancaster Boulevard. This knowledge and understanding of the City goals and objectives will help maintain consistency with previous City studies and plans and will provide consistent direction for projects moving forward.
The cost of the study will not exceed $48,450 and will be completed per the scope of services provided in the attached proposal by Sargent Town Planning.
Please let me know if you have any questions or need any additional information.
Sincerely,
Kimley-Horn and Assóciates, Inc.
Robert D. Blume,
Consultant Program Manager
kimley-horn.com 6G0 South Figueroa Street. Suite 1040, Los Angeles, CA 90017 213 261 4040
SARGENT TOWN PLANNING
9 May 2014
Bob Blume
Transportation Program Manager
City of Lancaster
44933 Fern Avenue
Lancaster, CA 93534
Re: Highway 138 Corridor Framework
Lancaster, California
Dear Bob:
Per our phone conversations over the past few weeks, Sargent Town Planning is pleased to provide this proposal to provide conceptual urban design services to the City of Lancaster. We propose to collaborate with you and City staff in defining a conceptual vision plan and urban design framework for the 14/138 freeway and freeway interchanges within the City of Lancaster, with some limited consideration of the arterial street segments adjacent and connecting to those interchanges. We propose to document that design vision and framework in the form of a concise Freeway Corridor Framework that will help City staff to guide and coordinate the design of current and future public improvements throughout the Corridor.
The team we propose to assign to this work is the same team the City is accustomed to, including our internal staff and David Schneider, consulting landscape architect. This work will draw upon the Draft Corridors Plan produced by this team in collaboration with City staff, and on further discussion and collaboration with you and City staff. We outline below our proposed approach to this task, a description of the proposed deliverables, and an estimate of the assoclated professional fees.
Scope of Project
The Highway 14/138 Corridor Is the primary regional approach and entry to the City for most visitors, and has the potential to not only create a strong and positive first impression, but also to help guide and direct visitors to destinations throughout the City. In its current form the corridor is not performing those functions at a high level, and transforming the design character of these large spaces will require large-scale design interventions.
The funding currently available to the City for transportation improvements to several of those interchanges offers an opportunity to construct new infrastructure at such a significant scale.
We understand that the current funding allocations will be devoted mainly to transportation improvements, and that a key element of the City's strategy in preparing this Framework is to:
1. Define a corridor wide framework, context and general design themes, within which future designs for each freeway segment and each interchange node - through their basic design and including both near-term and potential future design enhancements - will present an image and identity that is both unique to its place and functional requirements, and that contributes to a coherent design and image of Lancaster's 138 corridor as a whole.
Pershing Square Building | 448 South Hill St, Ste. 401, Los Angeles, CA, 90013 | 213.599.7680 | www.SargentTownPianning.com
SARGENT TOWN PLANNING
2. Describe in general terms the urban context within which each interchange will operate, suggesting general parameters for the image and role of each.
3. Define a recommended vocabulary and palette of design enhancement types for the corridor, to help guide the design of near-term transportation improvements as well as future improvement projects and additional design enhancements as resources become available.
Proposed Scope of Services
We propose to work closely and collaboratively with City staff to produce the Freeway Corridor Framework in a relatively short period of time. We suggest the following approach and tasks.
1. Kickoff Meeting: We would meet with you and Engineering Department staff, along with any other interested parties invited by you, to review the maln objectives and parameters for the Corridor Framework. We suggest that the agenda for the meeting might include:
a. Presentation by City staff of current and upcoming improvement projects within the Corridor, your and engineering staff's initial assessment of key related opportunities for community Image and design enhancements.
b. A brief review of design concepts from the Draft Corridors Plan that may be applicable to the 138 Corridor Framework.
c. A discussion of the anticipated role of each Interchange, and high-level goals and Initial visions for them.
d. Visual materials to support this conversation could include a short PowerPoint presentation of key elements from the Draft Corridors Plan, any materials provided by the City, and Google maps on the screen.
Deliverables: PowerPoint presentation, if so requested.
2. Corridor Design Concepts: Based on the input received in the kickoff meeting and on the previous Corridors Plan work, our team will work rapidly over the course of a week to prepare a series of diagrams, illustrative sketches and photographs of examples of freeway and interchange designs from other communities. The intent of these materials will be to suggest design themes and components for consideration in establishing a palette and theme for the Corridor. These are expected to include:
a. Concepts for enhancing bridges, walls and other structural elements of existing and future interchanges and overcrossings.
b. Landscape concepts and strategies for application to a range of conditions throughout the corridor, including banks sloping up and down from the freeway, interchanges, the Amargosa Wash, and other abutting spaces.
c. An overall palette of landscape types and materials that reflect Lancaster's unique geography and climate, aimed at both variation and cohesion.
d. For each interchange, a context description and diagram identifying general design considerations for the area surrounding the interchange. e. Suggestions for the integration of some of the initial branding and wayfinding graphic system outlined in the Corridors Plan, focused on opportunities to Integrate these with other design concepts and elements.
2 of 4
SARGENT TOWN PLANNING
f. Two or three potential overall design themes for consideration and discussion.
Deliverables: Design concepts summary PowerPoint presentation.
3. Review Meeting: We will attend a second meeting in Lancaster, to review the Draft Framework naterials with you and City staff. Goals for this meeting would include the revlew and discussion o the alternatives developed in Task 2, and the identification of the preferred themes, elements anc design palettes. We anticipate that discussion will be focused on implementation techniques anc challenges, to help inform the organization, content and format of the Draft Corridor Framework as a useful and effective implementation tool.
Deliverables: Meeting notes.
4. Draft Corridor Framework: Based on the discussion and direction in Task 3, we will organize the agreed upon concepts, diagrams, design element types, and coordination procedures into a Draft 138 Corridor Framework document. The document will be simply formatted, including diagrams and sketched, photographs of examples of recommended design elements, and short narrative descriptions of general design intent. As discussed and agreed In Task 3, the document will Include recommendatlons for design review and coordination procedures that may be employed by City staff as they manage the upcoming interchange design projects and the engineering teams responsible for each. We expect, subject to your agreement, that the Corridor Framework would include:
a. Diagrams, short narratives and illustrations - primarily photographs - describing the overall vislon and major design themes for the 138 Corridor.
b. Descriptions and illustrations of the primary design elements expected to contribute to the Corridor, including but not limited to landscape types, wall and bridge types, graphic elements, and potentially public art elements.
c. Implementation recommendations and suggestions related to the coordination and integration of individual improvement projects.
Deliverables: Draft 138 Corridor Framework
5. Corridor Framework Report: When the City has had an opportunity to review the Draft Corridor Framework, we will meet with City staff to review and discuss all questions and comments. Based on that meeting we will make minor graphic and editorlal changes as requested, and will dellver the 138 Corridor Framework report to you.
Deliverables: 138 Corridor Framework Report, in high resolution PDF format. 3 of 4
SARGENT TOWN PLANNING
Proposed Schedule and Professional Fees
Ve propose to provide these services within the months of June, July and August-assuming authorization to roceed by the 10"* of June - for the fees outlined below. The fees are based on our customary billing rates, o which our fees for any requested additional services - if authorized in advance in writing - would be based.
Principal Senior Senior Principal Urban Task
Urban Urban Landscape Designer Subtotals
Planner Designer Architect
Task $190 $160 $160 $180 $130
1 Kickoff Meeting 4 4 4 $2,120
2 Design Concepts 16 32 32 32 $20,640
Review Meeting 4 4 4 $2,120
Draft Corridor Framework 32 4 24 $11,240
5 Corridor Framework Report 8 16 4 24 $7,920
Professional Fee Subtotal $8,360 $11,520 $5,120 $8,640 $10,400 $44,040 Schedule of Hourly Rates
Principa................... ... $190
Senior Urban Planner/Project Manager ...... ... $160
Senior Urban Designer.......... ... 160
Principal Landscape Architect................ ......... 180 Urban Designer/Landscape Architect.….... ...$130
Reimbursable Expenses
We propose to absorb the minimal costs of travel to and from Lancaster and printing of any hard copy progress drafts for internal use as overhead. To save paper and cost we propose to provide deliverables to the City in electronic form, either PowerPoint or high quality PDFs for printing. We will be glad to provide hard copies, if requested, at our in-house printing rates, which are generally lower than commercial printing houses, and of comparable quality.
If you have any questions or comments on this proposal, please do not hesitate to contact me at any time. We appreciate this opportunity to offer our services to the City of Lancaster and look forward to working with you on this interesting assignment.
Sincerely,
SARGENT TOWN PLANNING, INC.
DISA
David Sargent, President
4 of 4
ADDITIONAL AUTHORIZATION NO. 1
TASK 1, ITEM 5
PUBLIC OUTREACH PROPOSAL
Kimley» Horn
February 10, 2015
Ms. Marissa Diaz, P.E.
Senior Civil Engineer
Public Works Capitol Engineering Group
City of Lancaster
Lancaster, CA
RE: Outreach Program Phase 1 - Measure R Program Interchanges Dear Marissa,
As we have been discussing over the past few months, we propose to approach the outreach efforts on an overall corridor basis for the City of Lancaster Measure R Program Interchange Projects. This will provide a consistent approach to the outreach for each project and provide an opportunity to collectively present the program to various stakeholders. Following our meeting in mid-December, Baker/RBF put together the attached proposal based on the feedback provided.
The initial phase of the proposed outreach program includes the following elements:
• Kickoff Meeting with City
• Project Branding and Messaging
Public Participation Plan
• Project Website
• Project Informational Brochure
• Informational "Roadshow" Presentations
Stakeholder Workshops (one scoping meeting for each project) • Support to the Website answering questions
• Management and Coordination
We propose to have Baker/RBF manage the program outreach as outlined in their proposal. Susan Harden will lead the effort and is very familiar with the City of Lancaster through her previous work for the City and has committed to be the point of contact for the outreach program.
The cost of this first phase of the program will not exceed $66,000 and will be completed per the scope of services provided by Baker/RBF in the attached proposal.
Please let me know if you have any questions or need any additional information. ey-Horn and Associates, Inc.
Consultant Program Manager
kimley-horn.com 660 South Figueroa Street. Suite 1040, Los Angeles. CA 90017 2 13 261 4040 SR-138 Capacity Enhancements | Phase 1 Public Outreach Scope • Avenue G • Avenue] • Avenue K • AvenueL • Avenue M «
The following draft scope of work provides key tasks necessary to initiate the public outreach for the SR- 138 Capacity Enhancements. It includes a public participation plan, public information tools, stakeholder workshops, and outreach coordination. A final task and associated fee allows for additional public involvement activities that may not be specifically described in the scope of work.
Task 1: Kick-off Meeting
The RBF Outreach team will facilitate an interactive kick-off meeting with City staff, project team members, Caltrans and others to discuss the corridor outreach process and approach. During the meeting, a thorough stakeholder analysis will be initiated and the Phase 1 outreach program and schedule will be discussed.
Key objectives of this meeting are to:
Initiate a stakeholder analysis
Review scope of work, deliverables, and schedule
Discuss design and type of outreach materials
Outline draft outreach plan and schedule
• Discuss project branding and messaging
Begin development of the Public Participation Plan
Task 1 Deliverables
• Meeting notes
Task 2: Project Branding & Messaging
Using an eye-catching design formatted for print and online, the RBF Team will develop three (3) draft logos for staff review. Additionally, RBF will prepare a draft "elevator speech" and key talking points for the SR 138 project. The talking points will be developed with input from City staff and the project team to ensure consistent messaging. The RBF Team will refine one logo/brand for use during the outreach process and finalize talking points/message with input from the project team, and present back to the City.
Task 2 Deliverables
• Three (3) draft logos and branding theme
One (1) final logo and branding theme
Project talking points / message
SR-138 Capacity Enhancements | Draft Outreach Scope RBF CONSULTING | January 6, 2015 Task 3: Draft Public Participation Plan
Incorporating information from the kick-off meeting, the RBF Team will draft a comprehensive Public Participation Plan for Phase 1. The Plan will include elements necessary for the RBF Team and the project team to ensure active public participation and awareness. The Public Participation Plan will include, at a minimum:
• Stakeholder analysis
• Notification strategies
• Outreach activities
• Schedule
• Responsibilities
• Social media and local media strategy
• Media contacts and strategy (as determined with the City Communications) • Language translation and interpretation needs
Task 3 Deliverables
• Draft Public Participation Plan
• Final Draft Public Participation Plan
Task 4: Project Website
The RBF Team will design and host a website that provides 24-hour access to information about the SR- 138 Capacity Enhancements. The website design will utilize the branding and messaging determined in Task 2 and may include the following sections:
• About the Project
• Project Goals
• Latest News
• Project Team
• Get Involved
• Documents/Information
Subscribe
Contact
RBF will work with the project team in designing the structure and providing content. The site will be updated as necessary to reflect new materials and updates. In addition to a written description of the project, a simple informational video describing the interchange enhancements and the goals of the project will be embedded on the website. This video may include a narrated flyover using Google Earth, photographs, and interview excerpts with the mayor and/or other city officials. The community will also be invited to subscribe to email updates.
Task 4 Deliverables
• One (1) draft website mockup
One (1) revised website design mock-up
One (1) final website design
SR-138 Capacity Enhancements | Draft Outreach Scope RBF CONSULTING | January 6, 2015 Task 5: Project Informational Brochure
The RBF Team will prepare an informational brochure describing the SR-138 project, highlighting unique features of each interchange enhancement. The piece will be developed to be used throughout the process and will include the project website and contact information. It will be available for download on the website, while copies of the brochure can be distributed at informational meetings and be available at public locations such as City Hall and the Library.
Task 5 Deliverables
• One (1) draft PDF brochure
• One (1) final PDF brochure
Task 6: Informational "Roadshow" Presentations
Using a "go to them" strategy, RBF will host up to ten (10) informational "roadshow" presentations with organized groups based on the stakeholder analysis. The level of outreach required for each interchange will vary, but the "roadshows" could include major shopping centers like the Antelope Valley Center Shopping Center, cultural and social stakeholders like the Antelope Valley Fair and the Rotary Club, hospitals including the Antelope Valley Hospital, and schools and colleges in the area.
A short PowerPoint and/or set of display boards and handouts (a.k.a. the "roadshow") will be prepared for use at these meetings, and made available for staff use at additional meetings if desired.
Task 7 Deliverables
• One RBF staff providing up to ten (10) presentations
• PowerPoint presentation
• Display boards and handouts
Task 8: Stakeholder Workshops (5)
RBF will host five (5) environmental scoping meetings or focused workshops for the community to have the opportunity to consult on the environmental impacts of each interchange capacity enhancement before the draft EIR is created. The scoping meetings are part of a process of defining and refining the scope of an environmental impact report (EIR) and the alternatives to be investigated. Affected property owners and other stakeholders can provide detailed comments about issues pertaining to their properties. For example, stakeholders can provide information on sensitive environmental features in the project area; suggest alternatives to be evaluated; or help identify construction constraints.
Task 8 Deliverables
Five (5) public notices and / or flyer
Five facilitated public meetings
SR-138 Capacity Enhancements | Draft Outreach Scope RBF CONSULTING | January 6, 2015 PowerPoint presentation
Display boards and handouts
Task 9: Questions/Comments
RBF will coordinate responses to public questions and comments about the SR-138 Capacity Enhancements project. Answers to questions routed through the project website or through the City will be facilitated by RBF to either connect with appropriate City/project staff or provide project information.
Task 9 Deliverables
Coordination of and response to public Q&A - assumes approximately 4 hours per month Task 10: Management & Coordination
To ensure that the public outreach is well coordinated, the RBF Team will communicate regularly with the project teams and City staff, both in person and via email/phone. Coordination will include attending meetings of individual interchange teams, specifically scheduled outreach meetings, and City meetings as appropriate.
Task 10 Deliverables
• Coordination and meeting attendance - assumes approximately 8 hours per month Task 11: Additional Outreach & Engagement
As the need arises and as approved by the City, RBF will host workshops, develop articles and handouts, facilitate additional stakeholder meetings, etc. A contingency budget has been included for this task.
SR-138 Capacity Enhancements | Draft Outreach Scope RBF CONSULTING | January 6, 2015 ADDITIONAL AUTHORIZATION NO. 1
TASK 2, ITEM 1
PLANNING PHASE SERVICES
AVENUE J INTERCHANGE PROPOSAL
Scope of Work
SR-14(SR-138)/Avenue J Interchange Improvements
Project Study Report - Project Development Support
Background
The project study area is in City of Lancaster and includes SR-138(SR-14) between Lancaster Boulevard and Avenue J-8, Avenue J between 15" Street West and 25" Street West, and 22'd Street West from Avenue J to Avenue J-4.
The purpose of this project is to reduce congestion and improve operational capacity at the SR- 138/Avenue J Interchange and the surrounding local streets, while providing a more appealing environment for pedestrians and bicyclist as well as other context sensitive solutions such as improved In October 2014, Caltrans agreed to a more streamlined approach to complete the PSR-PDS for the City of Lancaster projects funded through construction for 5R-138(SR-14). Caltrans also provided a copy of a recently approved PSR-PDS as an example, which contained a "mini-PEAR" and an abbreviated SWDR Scope of Work
Task 1. Project Management
Kimley-Horn & Associates and its subconsultants (Kimley-Horn) will provide project management for the duration of the project, and coordinate with Metro, Caltrans and other key stakeholders. Kimley-Horn will attend a project kick-off meeting with City of Lancaster and Caltrans, and monthly progress meetings to coordinate work. Deliverables will include:
Monthly invoices with progress reports
Project schedule and any updates
Agendas and meeting notes for the kick-off and monthly progress meetings Task 1 assumptions:
• 6-month schedule from NTP to Caltrans' approval of PSR-PDS Task 2. Data Collection
Kimley-Horn will assemble and revlew existing information and resource material available for the project, including as-built drawings, aerial photographs and mapping, right of way and utility maps, and technical studies prepared by Caltrans or other agencies. Perform field reviews to document the condition of the existing roadways and design constraints.
Deliverables will include:
• Technical memorandum summarizing existing information and resource material and a description of the existing facility
Task 3. Purpose and Need
1 Kimley-Horn will prepare a draft Purpose and Need statement for the project team's review based on the operational deficiencies with the existing roadways as well as the City's future plan for the project study area. Kimley-Horn will include a description of operational deficiencies on the SR-138 mainline, SR-138 ramps at Avenue J and Avenue 1-8, and local streets within the project study area using available traffic data (refer to Task 4 for related work).
Deliverables will include:
• Draft Purpose and Need Statement
Task 4. Preliminary Traffic Evaluation
Kimley-Horn will coordinate with City or City's traffic consultant on the development of the required traffic operational analysis in both existing and Year 2040 conditions. Kimley-Horn will review available traffic operational analysis and prepare a description of operational deficiencies on the existing facilities within the project study area.
Deliverables will include:
• Technical memorandum summarizing operational deficiencies on the existing facility Task 4 assumptions:
• City of provide traffic operational analysis in the existing condition and Year 2040 condition for freeway mainline, ramp merges and diverges, weaving sections and intersections within the project study area
No need to prepare the Traffic Engineering Performance Assessment (TEPA) checklist Task 5. Alternatives Development
Kimley-Horn will develop alternatives that address the purpose and need and can be carried forward to the PA&ED phase. Schematic layout maps and typical cross-sections will be prepared for each build alternatives for the project team to review. Below is a list of potential improvements based on our understanding of the project scope:
• New southbound on-ramp from Avenue J
• New northbound off-ramp to Avenue J
• Modification to southbound on-ramp from Avenue J-8
• Modification to northbound off-ramp to 20"h Street West • Improved intersection control at ramp termini on Avenue J and J-8 (such as signals, roundabouts, etc.)
• Widening of 20*h Street West Overcrossings and Avenue 1-8 Overcrossings to accommodate ramp additions at Avenue J and Avenue J-8 Interchanges
• Improved pedestrian and bike access within the project study area, including a new Class | Bike Path along the Amargosa Creek between Lancaster Boulevard and Avenue J-8, and closure of sidewalk gaps on Avenue J
• Landscaping and possible raised median on 22nd Street West • Landscaping within interchanges
• Improved way-finding
• Drainage improvements to meet agency requirements
2 Other context sensitive solutions within the project study area Deliverables:
• Schematic layout maps and typical cross-sections for each build alternative Task 5 assumptions:
• Up to 3 Build Alternatives will be developed
Task 6. PSR-PDS Preparation
Kimley-Horn will prepare a description for each build alternatives that will be carried forward in the PA&ED phase. The resources or costs needed to complete the PA&ED phase of the project will be identified.
Kimley-Horn will evaluate each build alternative and identify nonstandard design features if applicable.
A design standard risk assessment will be prepared as needed to assess the probability of obtaining approval from Caltrans on the nonstandard design feature.
Attachments to the report will include:
• Location and/or vicinity map
Schematic maps of project alternatives
Typical cross sections
• Capital Outlay Project Estimate
• Mini-PEAR (refer to Task 7 for scope of work)
• Right of Way Conceptual Cost Estimate Component
Risk Register
An abbreviated Stormwater Data Report: document site data and storm water quality design issues, including a preliminary discussion of evaluation of design pollution prevention BMPs and treatment BMP strategy.
Task 6 assumptions:
• Transportation Planning Scoping Information Sheet not needed • TEPA not needed
• Division of Engineering Services PSR-PDS Scoping Checklist not needed • PSR-PDS Survey Needs Questionnaire not needed
Task 7. Mini-Preliminary Environmental Analysis Report (Mini-PEAR) Kimley-Horn will prepare a Mini-PEAR to identify environmental issues, constraints, technical studies and corresponding resource needed to complete the PA&ED phase. Findings provided by this report are approximate and based on a review of existing records, databases and mapping tools to estimate the potential for probable environmental effects.
Task 7 assumptions:
• PEAR Technical Summaries typically required for a full PEAR are not needed 3 SR-138(SR-14)/Avenue J Interchange Improvements
Draft Fee Proposal Kimley» Hom
GPA Fees with
KHA ODC's 10% Markup Total Fees
5%
• PROJECTMANAGEMENT 78- 15 18 56 S 25,170. 1259 26,429
Project Management 48 48 96 S 14,160 $ 708 S $ 14,868
Meetings 30 15 15 60 S 11,010 551 $ 11,561
ED DATA COLLECTION 80 132 810 127.006
Field Review 40 56 $ 7,248 $ 362$ 7,610
Assemble and Review Existing Info 40j 20 76 $ 8,948 $ 9,395
3.0 PERPOSE AND NEED 30 20] 50 S 9.660| 10248)
Draft P&N Statement 20 10 30| $ 5,880$ 294 6,174
Final P&N Statement 10 10 20 $ 3,780 IS 189 $ 3,969
4.D PRELIMINARY TRAFFIC EVALUATION 20 100 S 645 882 18,572 Coordinate with City and City's Consultant on Traffic Ani 10 40 50; S 8,820 S 441 S 9,261 Review Analsis and Summarize Deficiencies 10 40 50 S 8,820 5 441 $ 9.261 5Q AETERNATIVES DEVELOPMENT 301 50: 520 69D S B5,040 89,292 Base Map (aerial and R/W) 40 40 $ 4,400 $ 220 S $ 4,620 Draft Geometric Lavout and Typ X-sections (3 Alts) 201 801 40฿ 400i 540 S 66,600 S 3,330 S 69,930 Final Geometric Layout and Typ X-sections (3 Alts) 10 10 10 801 110 S 14,040 IS 702 S 14,742
16.0 PS-ADS PREPARATON 290 20 57,250 60,233
Capital outlay cost estimate 101 10 80 12,990 $ 13,640
Right of way estimate 101 20 4,710 4,946
Risk register 10 10| 10 4,660 4,893
Mini SWDR 10% 40 6,910 7,256
Draft PSR-PDS Report 10 80 15,510 vies us 16,286
Revised Draft PSR-PDS Report 10) 40 60 $ 7,335 7,702
Final PSR-PDS Report 10% 20 40 S 5,135 257 5,392
5.0 NOT PEAR 5$ 2,050 s3 S 15372S 16,578
Mini PEAR 5$ 1,050 $ 53 $ 15,472 $ 16,574
LOVAL ALL TASKS 1501| 399 1583HS 212006S 10600S 15472.9 298,078 02/11/2015
ADDITIONAL AUTHORIZATION NO. 1
TASK 2, ITEM 2
PLANNING PHASE SERVICES
AVENUE L INTERCHANGE PROPOSAL
Scope of Work
SR-14/(SR-138)/Avenue L interchange Improvements
Project Study Report - Project Development Support
Background
The project study area is in City of Lancaster and includes SR-138(SR-14) between Avenue K-8 and Avenue L-8, and Avenue L between 10" Street West and 15'h Street West.
The purpose of this project is to reduce congestion and improve operational capacity at the SR- 138/Avenue L Interchange and the surrounding local streets, while providing a more appealing environment for pedestrians and bicyclist as well as other context sensitive solutions such as improved way-finding.
In October 2014, Caltrans agreed to a more streamlined approach to complete the PSR-PDS for the City of Lancaster projects funded through construction for SR-138(SR-14). Caltrans also provided a copy of a recently approved PSR-PDS as an example, which contained a "mini-PEAR" and an abbreviated SWDR format.
Scope of Work
Task 1. Project Management
Kimley-Horn & Associates and its subconsultants (Kimley-Horn) will provide project management for the duration of the project, and coordinate with Metro, Caltrans and other key stakeholders. Kimley-Horn will attend a project kick-off meeting with City of Lancaster and Caltrans, and monthly progress meetings to coordinate work. Deliverables will include:
• Monthly invoices with progress reports
• Project schedule and any updates
• Agendas and meeting notes for the kick-off and monthly progress meetings Task 1 assumptions:
• 6-month schedule from NTP to Caltrans' approval of PSR-PDS Task 2. Data Collection
Kimley-Horn will assemble and review existing information and resource material available for the project, including as-built drawings, aerial photographs and mapping, right of way and utility maps, and technical studies prepared by Caltrans or other agencies. Perform field reviews to document the condition of the existing roadways and design constraints.
Deliverables will include:
• Technical memorandum summarizing existing information and resource material and a description of the existing facility
Task 3. Purpose and Need
1 Kimley-Horn will prepare a draft Purpose and Need statement for the project team's review based on the operational deficiencies with the existing roadways as well as the City's future plan for the project study area. Kimley-Horn will include a description of operational deficiencies on the SR-138 mainline, SR-138 ramps at Avenue L, and local streets within the project study area using available traffic data (refer to Task 4 for related work).
Deliverables will include:
Draft Purpose and Need Statement
Task 4. Preliminary Traffic Evaluation
Kimley-Horn will coordinate with City or City's traffic consultant on the development of the required traffic operational analysis in both existing and Year 2035 conditions. Kimley-Horn will review available traffic operational analysis and prepare a description of operational deficiencies on the existing facilities within the project study area.
Deliverables will include:
• Technical memorandum summarizing operational deficiencies on the existing facility Task 4 assumptions:
• City of provide traffic operational analysis in the existing condition and Year 2035 condition for freeway mainline, ramp merges and diverges, weaving sections and intersections within the project study area
• No need to prepare the Traffic Engineering Performance Assessment (TEPA) checklist Task 5. Alternatives Development
Kimley-Horn will develop alternatives that address the purpose and need and can be carried forward to the PA&ED phase. Schematic layout maps and typical cross-sections will be prepared for each build alternatives for the project team to review. Below is a list of potential improvements based on our understanding of the project scope:
• Realignment of all four on-ramps from Avenue L to eliminate high speed entrance ramp • Modifications to Avenue L approaching ramp termini
• Roundabout at ramp termini on Avenue L.
• Improved pedestrian and bike access within the project study area • Improved way-finding
• Drainage improvements to meet agency requirements
• Other context sensitive solutions within the project study area Deliverables:
• Schematic layout maps and typical cross-sections for each build alternative Task 5 assumptions:
• Up to 3 Build Alternatives will be developed
2 Task 6. PSR-PDS Preparation
Kimley-Horn will prepare a description for each build alternatives that will be carried forward in the PA&ED phase. The resources or costs needed to complete the PA&ED phase of the project will be identified.
Kimley-Horn will evaluate each build alternative and identify nonstandard design features if applicable.
A design standard risk assessment will be prepared as needed to assess the probability of obtaining approval from Caltrans on the nonstandard design feature.
Attachments to the report will include:
• Location and/or vicinity map
• Schematic maps of project alternatives
Typical cross sections
• Capital Outlay Project Estimate
• Mini-PEAR (refer to Task 7 for scope of work)
• Right of Way Conceptual Cost Estimate Component
• Risk Register
• An abbreviated Stormwater Data Report: document site data and storm water quality design issues, including a preliminary discussion of evaluation of design pollution prevention BMPs and treatment BMP strategy.
Task 6 assumptions:
• Transportation Planning Scoping Information Sheet not needed • TEPA not needed
• Division of Engineering Services PSR-PDS Scoping Checklist not needed • PSR-PDS Survey Needs Questionnaire not needed
Task 7. Mini-Preliminary Environmental Analysis Report (Mini-PEAR) Kimley-Horn will prepare a Mini-PEAR to identify environmental issues, constraints, technical studies and corresponding resource needed to complete the PA&ED phase. Findings provided by this report are approximate and based on a review of existing records, databases and mapping tools to estimate the potential for probable environmental effects.
Task 7 assumptions:
PEAR Technical Summaries typically required for a full PEAR are not needed 3 SR-138(SR-14)/Avenue L Interchange Improvements
Draft Fee Proposal Kimley » Horn
Project Sr Roadway Sr Traffic GPA Fees with
Task Description Manager Engineer Engineer Analyst Clerical Total Hours KHA Fees KHA ODC's 10% Markup Total Fees Billing rate 210 146 168 $ 110 $ 85 5%
O PROJECEMANAGEMENT $5 152 25,120 45259. 26,429
Projec Management 48 48 96 $ 14,160 708 S 14,868
Meetings 30 15( 15 60$ 11,010 S 551 | $ 11,561
•ZO DATA COLLECTION 36ll 20] 16,196 810 32,006
Field Review 8 40 56. S 7,248 362 $ 7,610
Assemble and Review Existing Info 8 8 40฿ 201 76 S 8,948 447 $ 9,395
3.0 PURPOSE AND NEED 20% 5,660 483 10443
Draft P&N Statement 20l 101 30|5 5,880 294 6,174
Final P&N Statement 10฿ 10% 20 $ 3,780 189 $ 3,969
AD PRELLMINARY TRAFFIC EVALUATION 20 Sd: 100 S 17,540 18,522 Coordinate with City and City's Consultant on Traffic An 10 40. 50 8,820 441 9,261 Review Analysis and Summarize Deficiencies 10 401 501 $ 8,820 S 441 $ 9,261 ES DEVELOPMENT 30. 90 50 440 610 75,240 3,812 30.052
Base Map (aerial and R/W) 40 40 S 4,400 220 $ 4,620
Draft Geometric Layout and Typ X-sections (3 Alts) 20 80 401 320 460) 57,800 2,890 60,690 Final Geometric Layout and Typ X-sections (3 Alts) 10 10 104 80 110, 14,040 702 $ 14,742
5.0 PSR-POSPREPARATION 45) 270 20) 4302 SE. PSO 2,753 57.808 Capital outlay cost estimate 60 10,790 540 11,330
Right of way estimate 10 20 35 nees 4,710 236 4,946
Risk resister 10j 10 10 30 4,560 233 4,893
Mini SWDR 10) 40 55 $ 6,910 346 7,256
Draft PSR-PDS Report 10 20 10 125$ 15,510 776 $ 16,286
Revised Draft PSR-PDS Report 5 60] 7,335 367 7,702
Final PSR-PDS Report 5 40| 5 5.135 257 5,392
20 MAIPEAR 2,050 53 15422 (16,574
MinI PEAR $ 1,050 53 $ 15,472 S 16,574
TOTAL ALLTASKS 201006 5 10,050 S 15,432 S 226,528
02/11/2015
EXHIBIT "B"
ADDITIONAL AUTHORIZATION NO. 1
PAYMENT CLAUSE
The City of Lancaster shall reimburse the CONSULTANT for actual costs, including labor costs and employee benefits incurred by the CONSULTANT in performance of the work for Additional Authorization No. 1, in an amount Not to Exceed $850,933.00, for a total amount Not to Exceed $2,592,313.00.
Actual costs shall not exceed the estimated wage rates and other costs as set forth in the CONSULTANT'S proposal. Source documentation supporting billed costs must be submitted with invoice. CONSULTANT shall provide a cost breakdown with hourly rates for each office and field function in the event that additional work is required beyond the not to exceed fee given. Any additional work will require a separate Authorization for Consultant Services signed by both parties.
Consultant shall not be reimbursed for actual travel expenses incurred in the performance of the work.
Enda Melein May 1420159:34 AM
Enda Melvin, Senior Vice President
Kimley-Horn and Associates, Inc.
EXHIBIT "B"
Kimley» Horn
NOT INCLUDED IN ADDITIONAL AUTHORIZATION NO. 1
A contract modification will be required to allow this corridor study approach and to allow Kimley-Horn to complete the Streamlined PIDs' as proposed.
The contract modification required to complete this work is summarized below:
Corridor Approach/Studies Sub Consultant Firm Cost
Traffic Forecasting and Methodology Fehr and Peers $66,000 Optional Traffic Analysis Fehr and Peers $55,000
Optional Sensitivity Analysis & Phasing Fehr and Peers $57,200 Optional Interchange Updated Forecasts Fehr and Peers $11,000 Existing Hydrology Penfield and Smith/Stantec 562 260
Optional Build-Out Hydrology Penfield and Smith/Stantec $42,460 Aesthetic Framework Master Plan Sargent Town Planning $48,450 Public Outreach Baker/RBF $66,000
Environmental Existing Setting Studies GPA Environmental $143,617 Total $551,987
Streamlined PID's for Avenue J and Avenue L
Streamlined PID's Consultant Firm Cost
Avenue J Interchange Kimley-Horn $238,078
Avenue L Interchange Kimley-Horn $226,528
Total $464,606
The total required to amend the Kimley-Horn and Associates, Inc. Program Management Contract is $1,016,593.
ADDITIONAL AUTHORIZATION NO. 1 TOTAL = $850,933
REMAINING $165,660 TO BE AUTHORIZAED SEPERATELY AS NEEDED kimley-horn.com 660 South Figueroa Street, Suite 1040, Los Angeles, CA 90017 / 213 261 4040