DECEMBER 15, 2025
44811
Sierra
Highway,
Lancaster,
CA
LANCASTER
POLICE
DEPARTMENT
Solar + Battery + EV Charging + AMPS
The proposed project is a fully engineered, turnkey on-site energy asset consisting of a 127 kW rooftop solar
PV
system
paired
with
a
210
kWh
battery
energy-storage
system
and
(3)
level-2
EV
charging
stations.
Once
operational,
the
system
will
be
fully
managed
by
Mynt
and
designed
to
reduce
long-term
electricity
costs,
improve
energy
resilience,
and
deliver
measurable
operational
savings
to
the
police
department.
The
project
is
structured
to
lower
ongoing
operating
expenses
while
providing
critical
backup
power
capability
for
essential
public-safety
functions.
SCOPE OF WORK*
Solar PV System: 127kW Rooftop Solar
Energy Storage System (ESS): (1) 100kW/210kWh Battery EV Charging: (3) Level 2 EV Charging Stations
AMPS ( Asset Management Performance Services )
System maintenance, monitoring and performance verification. Real-time technology upgrades, optimization, software, firmware updates.
Estimated Timeline: 4-6 months from execution of construction contract
*scope
and
forecast
are
subject
to
change
upon
final
engineering
MYNTSYSTEMS.COM | 408-426-5420 |
111
MISSION
STREET,
SANTA
CRUZ,
CA
95060
USA
DECEMBER 15, 2025
Project Performance
Lancaster Police Department
44811 Sierra Highway, Lancaster, CA
CASH OPTION ECONOMIC FORECAST*
Proposed Gross Project Cost: $941,170
Solar Project Cost $488,174
Battery Project Cost $246,379
EV Charging Cost** $49,755
15% Contingency $117,646
5% CITY Staff Labor $39,215
Year-1 Tax Incentives: $376,468
40% ITC Federal Tax Credit $376,468
NET PROJECT COST
(after tax incentives and rebate) $564,702
Annual Net Savings** $46,727 (average over the fi
rst 10 years)
Simple Payback 9.1 years
25-Year IRR 11%
25-Year Cumulative Cash Flow $1,402,000
25-Year Net Present Value (6.00% DR) $387,267
*Project cost will be confirmed upon further engineering (roofing costs not included) *Costs by scope are not representative of stand-alone project costs **Includes cost of AMPS. AMPS includes system maintenance, monitoring, troubleshooting, and revenue management.
Participation in the AMPS program ensures maximum return on investment over the project lifetime. **Savings estimates include: PG&E cost savings, RECs, and grid services revenue SYSTEM SPECIFICATIONS*
Solar PV System: (215) Phono 590 Watt Solar Modules PS590M8GF-24/TNH (2) Sol-Ark 60 Watt Hybrid Inverters 60K-3P-480V
Energy Storage System (ESS): (1) Discover Energy Systems 100kW/210kWh Battery CAB-210 EV Charging (3) Fractal Level 2 EV Charging Stations Fractal 80A L2 MYNTSYSTEMS.COM | 408-426-5420 | 111 MISSION STREET, SANTA CRUZ, CA 95060 USA