DECEMBER 15, 2025

44811

Sierra

Highway,

Lancaster,

CA

LANCASTER

POLICE

DEPARTMENT

Solar + Battery + EV Charging + AMPS

The proposed project is a fully engineered, turnkey on-site energy asset consisting of a 127 kW rooftop solar

PV

system

paired

with

a

210

kWh

battery

energy-storage

system

and

(3)

level-2

EV

charging

stations.

Once

operational,

the

system

will

be

fully

managed

by

Mynt

and

designed

to

reduce

long-term

electricity

costs,

improve

energy

resilience,

and

deliver

measurable

operational

savings

to

the

police

department.

The

project

is

structured

to

lower

ongoing

operating

expenses

while

providing

critical

backup

power

capability

for

essential

public-safety

functions.

SCOPE OF WORK*
Solar PV System: 127kW Rooftop Solar
Energy Storage System (ESS): (1) 100kW/210kWh Battery EV Charging: (3) Level 2 EV Charging Stations
AMPS ( Asset Management Performance Services )
System maintenance, monitoring and performance verification. Real-time technology upgrades, optimization, software, firmware updates.

Estimated Timeline: 4-6 months from execution of construction contract

*scope

and

forecast

are

subject

to

change

upon

final

engineering

MYNTSYSTEMS.COM | 408-426-5420 |

111

MISSION

STREET,

SANTA

CRUZ,

CA

95060

USA

DECEMBER 15, 2025
Project Performance
Lancaster Police Department
44811 Sierra Highway, Lancaster, CA
CASH OPTION ECONOMIC FORECAST*
Proposed Gross Project Cost: $941,170
Solar Project Cost $488,174
Battery Project Cost $246,379
EV Charging Cost** $49,755
15% Contingency $117,646
5% CITY Staff Labor $39,215
Year-1 Tax Incentives: $376,468
40% ITC Federal Tax Credit $376,468

NET PROJECT COST
(after tax incentives and rebate) $564,702
Annual Net Savings** $46,727 (average over the fi
rst 10 years)
Simple Payback 9.1 years
25-Year IRR 11%
25-Year Cumulative Cash Flow $1,402,000
25-Year Net Present Value (6.00% DR) $387,267
*Project cost will be confirmed upon further engineering (roofing costs not included) *Costs by scope are not representative of stand-alone project costs **Includes cost of AMPS. AMPS includes system maintenance, monitoring, troubleshooting, and revenue management.

Participation in the AMPS program ensures maximum return on investment over the project lifetime. **Savings estimates include: PG&E cost savings, RECs, and grid services revenue SYSTEM SPECIFICATIONS*
Solar PV System: (215) Phono 590 Watt Solar Modules PS590M8GF-24/TNH (2) Sol-Ark 60 Watt Hybrid Inverters 60K-3P-480V
Energy Storage System (ESS): (1) Discover Energy Systems 100kW/210kWh Battery CAB-210 EV Charging (3) Fractal Level 2 EV Charging Stations Fractal 80A L2 MYNTSYSTEMS.COM | 408-426-5420 | 111 MISSION STREET, SANTA CRUZ, CA 95060 USA