4906-0273-6072v2/022283-0547 1
RESOLUTION NO. ____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF LANCASTER, CALIFORNIA, ADOPTING THE CITY
OF LANCASTER LANDSCAPE AND IRRIGATION
DESIGN STANDARDS AND RESCINDING PRIOR
DESIGN STANDARDS
WHEREAS, the City of Lancaster (“City”) has for many years published technical criteria governing the design, materials and installation of landscaping and irrigation within the City in a document entitled the City of Lancaster Landscape and Irrigation Design Standards, which has been adopted and amended from time to time by the City Council; and WHEREAS, Section 16.24.280 of the Lancaster Municipal Code requires that landscaping within landscape maintenance district parkways and easements comply with the City’s landscape and irrigation standards, and amendment of those standards therefore alters what the Municipal Code requires; and
WHEREAS, the City Council has adopted Ordinance No. ____, which repealed and reenacted Chapter 8.50 of the Lancaster Municipal Code, and Section 8.50.080 of that chapter provides that the City Council shall adopt the Design Standards by resolution, that compliance with them is mandatory, and that the Director of Community Development may thereafter amend them administratively within the limits stated in that section; an d WHEREAS, the Community Development Department has prepared an updated edition of the Design Standards dated August 2026, which modernizes the technical specifications, incorporates current irrigation technology, and updates the plant palette and standard details; and
WHEREAS, the updated Design Standards as originally circulated contained provisions carried forward from an earlier edition that conflicted with Chapter 8.50 and with the Model Water Efficient Landscape Ordinance, Cal. Code Regs., tit. 23, §§ 490–495, and those provisions have been conformed as reflected in the edition adopted by this resolution; an d WHEREAS, the Design Standards adopted by this resolution include, for the first time, a root barrier specification and standard detail implementing Section 8.50.090 and Section
12.20.070 of the Lan caster Municipal Co de; and
WHEREAS, adoption of the Design Standards is exempt from the California Environmental Quality Act under Cal. Code Regs., tit. 14, §§ 15307, 15308 and 15061(b)(3), for the reasons stated in Ordinance No. ____; and
WHEREAS, the City Council ha s considered the Design Standards, the staff report, and all evidence and testimony presented.
4906-0273-6072v2/022283-0547 2
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LANCASTER DOES HEREBY RESOLVE AS FOLLOWS:
4906-0273-6072v2/022283-0547 3
Section 1. Recitals. The recitals set forth above are true and correct and are incorporated herein by this reference as findings of the City Council.
Section 2. Adoption. The City of Lancaster Landscape and Irrigation Design Standards, dated June 2026 and attached to this resolution as Exhibit A, are hereby adopted pursuant to Section 8.50.080 of the Lancaster Municipal Code.
Section 3. Rescission of prior standards. All prior additions of the City of Lancaster Landscape and Irrigation Design Standards including the edition in use since the adoption of Ordinance No. 1070 and every earlier edition , however adopted, approved or amended, and all amendments thereto, are hereby rescinded and superseded, effective on the operative date stated in Section 8 of this resolution. Any project for which a complete landscape documentation package was submitted to the City before that operative date may, at the election of the project applicant, be reviewed under the prior standards, provided that no such project may be reviewed under a standard less stringent than the Model Water Efficient Landscape Ordinance or Chapter 8.50 as it then exists.
Section 4. Mandatory compliance. Compliance with the Design Standards is mandatory for every project subject to Chapter 8.50 and for all landscaping installed, replaced or maintained within a landscape maintenance district, a lighting maintenance district or the public right-of-way.
Section 5. Conformity with the Municipal Code and state law. The City Council finds that the Design Standards adopted by this resolution are consistent with Chapter 8.50, with the Model Water Efficient Landscape Ordinance, and with the Water Conservation in Landscaping Act, Cal. Gov’t Code §§ 65591 –65599. In the event of any conflict between the Design Standards and Chapter 8.50, the Model Water Efficient Landscape Ordinance, or any other provision of the Lancaster Municipal Code or state law, the Code and state law control, and the Director of Development Services shall conform the Design Standards by administrative amendment pursuant to Section 8.50.080(D).
Section 6. Delegation of authority to make technical amendments. The Director of Community Development is authorized to amend the Design Standards administratively within the limits stated in Section 8.50.080(D) of the Lancaster Municipal Code, and shall record each such amendment in the amendments log maintained as the first page of the Design Standards. Any proposed amendment that exceeds the authority conferred by Section
8.50.080(D), including any amendment that would alter a numeric water conservation standard or make the Design Standards less stringent, shall be presented to the City Council for adoption by resolution.
Section 7. Amendments log. The Director of Community Development shall restore the amendments log to the Design Standards before the Design Standards are published or distributed, and shall record in that log the adoption of the Design Standards by this resolution, together with the resolution number and the date of adoption. 4906-0273-6072v2/022283-0547 4
Section 8. Operative date. This resolution shall be effective upon adoption, and the Design Standards adopted hereby shall become operative on the effective date of Ordinance No. ____. Should Ordinance No. ____ not take effect, this resolution shall be of no force or effect.
Section 9. Severability. If any provision of this resolution or of the Design Standards adopted hereby is held invalid, that invalidity shall not affect any other provision that can be given effect without the invalid provision, and to that end the provisions of this resolution and of the Design Standards are severable.
Section 10. Certification. The City Clerk shall certify to the adoption of this resolution and shall maintain a current copy of the Design Standards on file for public inspection.
PASSED, APPROVED and ADOPTED this ____ day of __________, 2026 , by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
ATTEST: APPROVED:
____________________________ ______________________________ ANDREA ALEXANDER R. REX PARRIS
City Clerk Mayor
City of Lancaster City of Lancaster
4906-0273-6072v2/022283-0547 5
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss
CITY OF LANCASTER )
CERTIFICATION OF RESOLUTION
CITY COUNCIL
I, __________________________, ________________________ City of Lancaster, California, do hereby certify that this is a true and correct copy of the original Resolution No. 26- , for which the original is on file in my office.
WITNESS MY HAND AND THE SEAL OF THE CITY OF LANCASTER, on this this ____ day of __________, 2026
(seal)
_____________________________
ANDREA ALEXANDER
City Clerk
City of Lancaster
4906-0273-6072v1/022283-0547 A-1
EXHIBIT A
City of Lancaster Landscape and Irrigation Design Standards C
ITY OF LANCASTER
LANDSCAPE AND IRRIGATION
DESIGN STANDARDS
Community Development Department
A
ugust 2026
2 LANDSCAPE AND IRRIGATION DESIGN STANDARDS AMENDMENTS
The following amendments have been incorporated into this August 2026 posting of the design standards.
Amendment R esolution
Number
Date Adopted
by City Council
Resolution
Number
Landscape And Irrigation Design
Standards adopted
3 CITY OF LANCASTER
LANDSCAPE AND IRRIGATION DESIGN STANDARDS
Table of Contents
LANDSCAPE AND IRRIGATION DESIGN STANDARDS AMENDMENTS ......................................................... 2 INTRODUCTION AND DESIGN PHILOSOPHY ....................................................................................................... 5 SECTION I – GENERAL REQUIREMENTS FOR ALL LANDSCAPE AND IRRIGATION ................................ 12 PART A – Landscape Documentation Package .......................................................................................................... 12 A. GENERAL ..................................................................................................................................................... 12
1. Plan Check Submittals ............................................................................................................................... 12
2. Subsequent Review Submittal ................................................................................................................... 13
3. Approved Drawings ................................................................................................................................... 13 B. LANDSCAPE AND IRRIGATION PLANS ................................................................................................ 13
1. Landscape Documentation Package .......................................................................................................... 13
2. Cover/Title Sheet ....................................................................................................................................... 14
3. Plan Sheets ................................................................................................................................................ 15
4. Irrigation .................................................................................................................................................... 16 C. WATER EFFICIENT LANDSCAPE WORKSHEET .................................................................................. 19 D. COMPLIANCE WITH LANDSCAPE DOCUMENTATION PACKAGE .................................................. 23 PART B – IRRIGATION AND LANDSCAPING MATERIALS AND INSTALLATION ...................................... 24 A. IRRIGATION - GENERAL .......................................................................................................................... 24
5. Irrigation Schedules ................................................................................................................................... 24
6. Permits and Fees ........................................................................................................................................ 24
7. Manufacturer’s Directions ......................................................................................................................... 25
8. Ordinance and Regulations ........................................................................................................................ 25
9. Explanation of Drawings ........................................................................................................................... 25
10. Contactor Responsibilities ......................................................................................................................... 25 B. IRRIGATION – SUBMITTALS ................................................................................................................... 26
1. Materials List ............................................................................................................................................. 26
2. Records and As-Built Drawings ................................................................................................................ 26 C. IRRIGATION – MATERIALS ..................................................................................................................... 27
1. PVC Pressure Mainline Pipe and Fittings .................................................................................................. 27
2. PVC Non-Pressure Lateral Piping ............................................................................................................. 28
3. Brass Pipe and Fittings .............................................................................................................................. 28
4. Galvanized Pipe and Fittings ..................................................................................................................... 28
5. Copper Pipe and Fittings ........................................................................................................................... 28
6. Thrust Blocks ............................................................................................................................................ 28
7. Quick Coupling Valves ............................................................................................................................. 28
8. Backflow Prevention Units........................................................................................................................ 29
9. Gate Valves/Ball Valves ............................................................................................................................ 29
10. Control Wiring .......................................................................................................................................... 29
11. Smart Controller Specification ................................................................................................................... 30
12. Electric Control Valves ............................................................................................................................. 30
13. Outdoor Automatic Controller Enclosure .................................................................................................. 30
14. Control Valve Box (only for in-ground valves) ......................................................................................... 31
15. Sprinkler Heads ......................................................................................................................................... 31
16. Booster Pump ............................................................................................................................................ 31 D. IRRIGATION-INSTALLATION PROCEDURES ....................................................................................... 32
1. Site Conditions .......................................................................................................................................... 32
2. Water Supply ............................................................................................................................................. 32
3. Trenching ................................................................................................................................................... 32
4. Backfilling ................................................................................................................................................. 32
5. Trenching and Backfill Under Paving ....................................................................................................... 32 4 6. Automatic Controller ................................................................................. ................................................ 33
7. High Voltage Wiring for Automatic Controller ......................................................... ................................ 33
8. Remote Control Valves ................................................................................ ............................................. 33
9. Lawn Sprinkler Heads ................................................................................. .............................................. 33
10. Shrub Sprinkler Heads ................................................................................ ............................................... 34
11. Drip Irrigation Systems .............................................................................. ............................................... 34
12. Existing Trees ....................................................................................... ................................................... .. 34
13. Inspection Schedule for Irrigation ................................................................... .......................................... 34
14. Clean-Up ............................................................................................. ................................................... ... 35 E. LANDSCAPING MATERIALS................................................................................. ................................... 35
1. Plant Materials ...................................................................................... ................................................... .. 35
2. Topsoil .............................................................................................. ................................................... ...... 36
3. Soil Amendments ...................................................................................... ................................................ 36
4. Sod Pre-plant Fertilizers ............................................................................ ................................................ 36
5. Tree/Shrub Pre-plant Fertilizers ..................................................................... ............................................ 36
6. Tree Ties ............................................................................................ ................................................... ..... 36
7. Tree Stakes .......................................................................................... ................................................... ... 36
8. Trunk Guards/Root Barriers ........................................................................... ........................................... 36
9. Mulch ................................................................................................ ................................................... ..... 37
10. Sod .................................................................................................. ................................................... ........ 37 F. LANDSCAPE - INSTALLATION PROCEDURES .................................................................. ................... 37
1. Grading and Soil Preparation ......................................................................... ............................................ 37
2. Ground Cover ......................................................................................... ................................................... 37
3. Planting of Trees Shrub and Vines .................................................................... ........................................ 38
4. Turf .............................................. ................................................... ................................................... ....... 38
5. Root Barrier Inspection .............................................................................. ............................................... 38
6. Compliance With The Certificate Of Completion ........................................................ ............................. 39 SECTION II: SPECIAL REQUIREMENTS FOR RESIDENTIAL LA NDSCAPE AND IRRIGATION................ 39 Maximum Allowable Turf Areas for Residential Development .................................................................................. 39 SECTION III: SPECIAL REQUIREMENTS FOR COMMERCIAL, I NSTITUTIONAL, AND INDUSTRIAL LANDSCAPE AND IRRIGATION ............................................................................. .............................................. 39 SECTION IV: SPECIAL REQUIREMENTS FOR LANDSCAPE MAIN TENANCE DISTRICTS AND PUBLIC RIGHTS-OF-WAY LANDSCAPE AND IRRIGATION ............................................................... ............................ 39 Appendix A – Reference ETo ........................................................................... ................................................... ....... 40 Appendix B – Water Efficient Landscape Worksheet ..................................................... .......................................... 42 Appendix C – Sample Certificate of Completion ........................................................ ............................................... 56 Appendix D – Effective Precipitation Disclosure Statement ..................................................................................... 62 Appendix E – Conversion Factors and Calculations ..................................................... ........................................... 64 Appendix F – Standard Details ........................................................................ ................................................... ....... 67 Appendix G – Plant List .............................................................................. ................................................... ............ 69 Appendix H – Standard Irrigation Equipment List ...................................................... ............................................ 71
5 INTRODUCTION AND DESIGN PHILOSOPHY
The City of Lancaster (City) desires to have landsc ape development in an attractive, water efficient, and high-quality manner. These landscape and irrigation design standards will enable designers and developers to clearly understand the City's intent with respect to landscape design and management.
It is the intent of these landscape and irrigation design standards not only to establish an acceptable level of quality for approval, but to achieve harmo ny with, and bring continuity to, the existing developed areas in the City.
To permit and encourage a pleasing aesthetic interaction with the environment, a landscape design should provide a variety of shapes, textures, and c olors as well as provide practical applications such as trees to produce shade and block high winds.
A well-founded design should:
• Integrate with, complement, and improve the existing permanent landscape. • Relate to and complement the architecture of structures on the site. • Mitigate erosion.
• Provide for screening of unsightly areas and noise, as well as provide for wind and sun control.
• Minimize the use of water by stressing water conservation. • Provide for a variety of design elements.
• Reflect the needs and expectations of those persons affected by the landscape. • Utilize plant material native to, or conducive to, the local environment.
The City is very concerned about proper water use management. The City requires design efforts to be conscious of water saving irrigation systems, as well as low water use plant materials.
These design standards shall apply to all single fa mily, multi-family, commercial, institutional, and industrial projects containing landscaping.
For each applicable project a Landscape Documentation Package will be submitted to the City for approval.
These Landscape and Irrigation Design Standards will be presented in the form of a Resolution to the City Council of the City and may be updated as needed by the City departments. 6 DEFINITION OF TERMS
For the purpose of carrying out the intent of these design standards, the words, phrases, and terms included herein have the meaning ascribed herein below.
“Anti-drain Valve” means a valve located under a sprinkler head to hold water in the system to prevent drainage from sprinkler heads when the system is off. “Application Rate” means the depth of water applied to a given area, m easured in inches per minute, inches per hour, or gallons per hour.
“Applied Water” means the quantity of water supplied by the irrigat ion system to the landscape.
“Backflow
Prevention Device ” means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system. “Backfill” means soil which is replaced in a hole after excava tion and placement of irrigation lines or plant materials.
“Conversion Factor” (.62) means the number that converts the maximum ap plied water allowance from acre-inches per acre per year to gallons per square foot per year. “Certificate of Completion” means the document required under by these design standards. “Certified landscape irrigation Auditor” means a person certified to perform landscape irrigation audits by a professional trade organization or other educational organization. “Certified Irrigation Designer” means a person certified to design irrigation syste ms by a professional trade organization or other educational organization. “Check valve” means a “one-way” valve that prevents water from fl owing backward though it.
Spring loaded check valves are sometimes installed inside or at the inlet of sprinkler heads. The check prevents low head drainage.
“Common Interest Developments” means community apartment projects, condominium projects, planned developments, and stock cooperatives per Civil Code Section 1353.8. “Controller” means an automatic timing device used to remotely control valves or heads to set an irrigation schedule. A weather-based controller is a controller that uses evapotranspiration or weather data. A self-adjusting irrigation controlle r is a controller that uses sensor data (i.e., soil moisture sensor).
“Development Proposal” means an application for approval of a specific pla n, subdivision, conditional use permit, site plan review, tentative tract map, parcel map or any other discretionary development permit or entitlement application which has been filed with and is pending consideration by the City.
“Drip irrigation” means any non-spray low volume irrigation system ut ilizing emission devices with a flow rate equal to or less than two (2) gallons per hour. “Drought Tolerant Plants” means plants from California and other dry areas that can survive on very little water, such as those which naturally gr ow in the high desert regions of southern California in normal rainfall years.
7 “Ecological Restoration Project” means a project where the site is intentionally alt ered to establish a defined, indigenous, historic ecosystem.
“Effective Precipitation” or “Usable Rainfall” means the portion of total precipitation that is used by the plants.
“Emitter” means a drip irrigation emission device that delivers water slowly from the system to the soil measured as gallons per hour.
“Erosion” means the transportation of soil particles, or mass movement of soil (mass wasting) by water, wind, or mechanical means.
“Engineer of Work” refers to the responsible designing professional of the respective project. “Established Landscape” means the point at which plants in the landscape ha ve developed significant roots growth into the site. Typically, most plants are established after one or two years of growth.
“Establishment period of the plants” means the first year after installing the plant in the landscape, or the first two years if irrigation will be terminated after establishment. “Estimated Applied Water Use” means the portion of the estimated total water use that is derived from applied water, as described in Appendix C, Section C4 . “Estimated Total Water Use” means the annual total amount of estimated water needed to keep the plants in the landscaped area healthy. It is ba sed upon such factors as the local evapotranspiration rate, the size of the landscaped area, the types of plants, and the efficiency of the irrigation system, as described in Appendix C, Section C3. “ET Adjustment Factor” means a factor that, when applied to reference evap otranspiration, adjusts for plant factors and irrigation efficiency, two major influences upon the amount of water that needs to be applied to the landscape. The maxi mum ETAF allowed in the MAWA equation must be equal to or below:
(A) 0.55 for residential regular landscapes areas.
(B) 0.45 for non-residential regular landscape areas.
(C) 1.0 for Special Landscape Areas.
“Evapotranspiration Rate” means the quantity of water evaporated from adjacent soil and other surfaces and transpired by plants during a specific time. “Flow Rate” means the rate at which water flows through pipes, valves, or emission devices, measured in gallons per minute, gallons per hour, or cubic feet per second. “Hardscape” means any durable surface material (pervious and no n-pervious). Hardscape shall be considered in the determination of the MAWA and storm water runoff flows. “Hydrozone” means a portion of the landscaped area having plants with similar water needs that are served by a valve or set of valves with the sam e schedule. A hydrozone may be irrigated or non-irrigated. For example, a naturalized area plan ted with native vegetation that will not need supplemental irrigation once established is a non-irrigated hydrozone. “Infiltration Rate” means the rate of water entry into the soil express ed as a depth of water per unit of time (i.e., inches per hour).
“Irrigation Efficiency” means the measurement of the amount of water beneficially used divided by the amount of water applied and is expressed as a percentage. Irrigation efficiency is derived from measurements and estimates of irrigation syste m characteristics and management practices. 8 The average irrigation efficiency used in the Estim ated Total Water use equation for purposes of this model ordinance are:
(A) 0.75 for overhead irrigation systems, and
(B) 0.81 for drip irrigation systems.
“Landscape Documentation Package” means the documents required under Title 8, Chapter 50 of the Lancaster Municipal Code (Lancaster Water Ef ficient Landscape Ordinance) and these design standards.
“Landscape Area” (LA) means all the irrigated planting areas, turfgrass areas, and water features in a landscape design plan subject to the Maximum A pplied Water Allowance calculation. The irrigated planting area does not include footprints of buildings or structures, sidewalks, driveways, parking lots, decks, patios, gravel or stone walks, other pervious or non-pervious hardscapes, and other non-irrigated areas designated for non-develo pment (e.g., open spaces and existing native vegetation). The landscape area is the sum of the landscape projects' regular landscape areas (RLA) and special landscape areas (SLA). LA = RLA + SLA.. Excessive use of impervious areas are discouraged as it will increase storm water runoff. Designated recreation areas and areas permanently and solely dedicated to edible plants, such as orchards and vegetable gardens, are subject to the MAWA with an ET adjustment factor not to exceed 1.0. “Landscape Architect” means a person who holds a license to practice landscape architecture in the State under the authority of Government Code Se ction 5615 (Landscape Architects Practice Act).
“Landscape Contractor” means a person licensed (i.e., C-27 license) by the State to construct, maintain, repair, install, or subcontract the devel opment of landscape systems and facilities per Business and Professionals Code, Section 7058 and 7059. “Landscape Irrigation Audit” means an in-depth evaluation of the performance of an irrigation system conducted by a Certified Landscape Irrigation Auditor. An irrigation audit includes, but is not limited to, inspection, system tune-up, system test with distribution uniformity or emission uniformity, reporting water waste, overspray or runoff that causes overland flow, and preparation of an irrigation schedule. The audit must be conduc ted in a manner consistent with the Irrigation Association's Landscape Irrigation Auditor Certific ation program or other U.S. Environmental Protection Agency “WaterSense” labeled auditing program. “Landscape Project” means a project, for the purposes of this ordinance , meeting the requirements under 8.50.040 of the Lancaster Municipal Code. “Landscaping” means a combination of trees, shrubs, perennial gro und covers, and artifacts, arranged in such a manner as to affect a design that follows the intent of this document. “Lateral Line” means the water delivery pipeline that supplies water to the emitters or sprinklers from the valve.
“Local Agency” when utilized within this document means the City of Lancaster. “Low Volume Irrigation” means any irrigation system with a flow rate equal to or less than
0.75 inches per hour, including drip irrigation, su bsurface drip, micro-sprinklers and similar irrigation types.
“Low Water Use Plant Material” means trees, shrubs, and ground covers that survive with a limited amount of supplemental water, as recommende d by the City’s Landscape and Irrigation 9 Design Standards, or as identified in the most rece nt edition of the following publication: Sunset Western Garden Book, Sunset Books, Lane Publishing Co., Menlo Park, California. “Main Line” means the pressurized pipeline that delivers water from the water source to the valve or outlet.
“Maximum Applied Water Allowance” means the upper limit of annual applied water for t he established landscaped area as specified by these d esign standards. It is based upon the area's reference evapotranspiration, the maximum ET Adjust ment Factor allowed, and the size of the regular landscape area (RLA) and the special landsc ape area (SLA). MAWA = (ETo) x (0.62) x [ETAF x RLA + 1.0 x SLA]
“Microclimate” means the climate of a small, specific area that ma y contrast with the climate of the overall landscape area due to wind, sun exposur e, plant density, and proximity to reflective surfaces.
“Mined Land Reclamation Projects” means any surface mining operation with a reclamati on plan approved in accordance with the Surface Mining and Reclamation Act of 1975. “Mulch” means any organic material such as leaves, bark, st raw, or compost, applied to the soil surface for the beneficial purposes of reducing eva poration, suppressing weeds, moderating soil temperature, and preventing soil erosion. Mulch inc ludes inorganic mineral materials such as rocks, gravel, or decomposed granite left loose (i.e., may be used for Fire Safe Landscaping). “Non-residential landscape” means the landscape area surrounding or associated with commercial, institutional, industrial, and public s ettings that may have areas designated for recreation or public assembly. It also includes the landscape area associated with common areas of common interest developments with designated recreational areas. “Operating Pressure” means the pressure at which an irrigation system is designed by the manufacturer to operate.
“Overhead Sprinkler Irrigation Systems” means systems that deliver water through the air (i.e., spray heads, rotors, etc.).
“Overspray” means the water that is delivered beyond the target area, wetting pavements, walks, structures, or other non-targeted areas.
“Parkway” means that area of a public street that is between the curb and sidewalk or between the sidewalk and the property line of the adjacent property owner which is used for landscape purposes.
“Plant factor” or “plant water use factor” is a factor, when multiplied by ETo, estimates the amount of water needed by plants. For purposes of t his model ordinance, the plant factor ranges are:
(A) very low water use plants is less than 0.1,
(B) low water use plants is 0.1 to 0.3,
(C) moderate water use plants is 0.4 to 0.6,
(D) high water use plants is 0.7 to 1.0.
Plant factors cited in this model ordinance are derived from the database “Water Use Classification of Landscape Species” (WUCOLS).
“Precipitation Rate” means the rate of application of water measured in inches per hour.
10 “Project Applicant” means the individual or entity submitting a Landsca pe Documentation Package required under Title 8, Chapter 50 of the L ancaster Municipal Code (Ordinance 892 - Prohibition of Wasting Water and Ordinance 893 – Water Efficient Landscape) to request a permit, plan check, or design review from the City. A proje ct applicant may be the property owner or his/her designee.
“Rain Sensor” or “Rain Sensing Shutoff Device” means a component that automatically suspends the irrigation event when it rains.
“Record Drawing” or “As-Builts” refers to a set of reproducible drawings which show significant changes in the work made during construction. Drawings are usually based on drawings that are marked up in the field and furnished by the contractor. “Recreational Area” refers to portions of parks, playgrounds, sports fi elds, golf course, or schoolyards in public and private projects where tu rf provides a playing surface or serves other high use recreational purposes.
“Recycled Water, Reclaimed Water, or Treated Sewage Effluent Water” means treated or recycled waste water of a quality suitable for nonp otable uses such as landscape irrigation and water features. This water is not intended for huma n consumption. “Reference Evapotranspiration” or “ETo” means a standard measurement of environmental parameters that affect the water use of plants. ETo is given in inches per day, month, or year as represented in Appendix A. Reference evapotranspir ation is used as the basis of determining the MAWA so that regional differences in climate can be accommodated. “Regular landscape area” (RLA) is the portion of the irrigated landscape area that is not a special landscape area. RLA = LA -- SLA.
“Rehabilitated Landscapes” means any re-landscaping project that requires a permit, plan check, or design review and meets the requirements of this document and Title 8, Chapter 50 of the Lancaster Municipal Code (Lancaster Water Efficient Landscape Ordinance). “Root Barrier” means a physical wall buried underground to block, deflect, or control the sideways growth of tree roots.
“Runoff” means water that is not absorbed by the soil or landscape to which it is applied and flows from the landscape area. For example, runoff may re sult from water that is applied at too great a rate (application rate exceeds infiltration rate) o r when there is a slope. Grading and landscape shall be designed to minimize runoff.
“Soil Moisture Sensor or Sensing Device” means a device that measures the amount of water in the soil.
“Soil Texture” means the classification of soil based on its percentage of sand, silt, and clay. “Special Landscape Area” (SLA) means an irrigated area that may be all or part of the landscape project and is permanently and solely dedicated to edible p lants such as orchards and vegetable gardens, recreational areas, areas irrigated with recycled water, or water features using recycled water. “Sprinkler Head” means a device that delivers water through a nozzle. “Static Water Pressure” means the pipeline or municipal water supply pressu re when water is not flowing.
“Station” means an area served by one valve or by a set of valves that operate simultaneously. 11 “Swing Joint” means an irrigation component that provides a flexi ble, leak-free connection between the sprinkler and lateral pipeline to allow movement in any direction and to prevent equipment damage.
“Street Trees” means trees planted in the public right-of-way along city streets for beautification and benefit of the general public.
“Topsoil” means soil within the A-2 horizon of a soil profile that contains organic matter, nutrients, and the micro-organisms necessary for normal plant growth. “Turf” means a groundcover surface of mowed grass. Annual Bluegrass, Kentucky Blue grass, Perennial Ryegrass, Red Fescue, and Tall Fescue are common cool-season grasses. Bermuda grass, Kikyu grass, Seashore Paspalum, St. Augustin e grass, Zoysia grass, and Buffalo grass are common warm-season grasses.
“Valve” means a device used to control the flow of water in the irrigation system. It may also mean all of the sprinklers or emitters in a line controlled by the valve. “Water Conservation” means the conservation of water resources through p roper water use management procedures, design, and maintenance proc edures. There are many methods; one popular method is to use low volume irrigation and drought tolerant plant materials. “Water Conserving Plant Species” means a plant species identified as using less water than other plants in the same water use category.
“Water Efficient Landscape Worksheet” means the document required under Title 8, Chapter 50 of the Lancaster Municipal Code (Lancaster Water Efficient Landscape Ordinance) and found in this document. Section I, Part A, Paragraph C ha s instructions for filling out the worksheet in Appendix B.
“Water Use Efficiency Statement” means a narrative summary of the water use efficien cy practices to be applied in the landscape project.
“Wildlife” means indigenous or naturalized bird, reptile, mammal, fish, or invertebrate life found in the out of doom.
“WUCOLS” means the Water Use Classification of Landscape Species IV, 2014, which is herein incorporated by reference, and maintained by the Ca lifornia Center for Urban Horticulture, University of California. WUCOLS IV is an online da tabase that classifies and provides regional water needs for commonly available landscape plants.
12 SECTION I – GENERAL REQUIREMENTS FOR ALL LANDSCAPE AND IRRIGATION PART A – Landscape Documentation Package
A. GENERAL
Owner/Consultant shall submit to the City the required Landscape Documentation Package for all projects where landscaping is required as a part of the project development.
All packages submitted shall be prepared under the direct supervision of a Registered Landscape Architect (State of California), with all drawings bearing his/her signature or, upon approval of the City, a licensed and qualified Landscape Contractor (State of California).
In situations where plans and standards are in conflict, these design standards shall prevail.
Landscaping or the installation of an irrigation system in the City shall not be undertaken until the City has reviewed and approved plan submittals and specifications covering the proposed use of plant materials and irrigation systems in order to determine:
• That proposed plant material will be suitable aesth etically and ecologically for the particular planting situation.
• That proposed planting will meet minimum requiremen ts as set forth by these design standards.
• That proposed irrigation system will be adequate to properly irrigate proposed planting. • The improvements are permanent and of a nature and quality to assure low maintenance, operations costs, and survivability of the landscape.
• That all landscaping conditions are met.
1. Plan Check Submittals
Submit initial and all subsequent Landscape Documen tation Packages to the Public Works Department.
The package shall consist of the following:
• Three (3) sets Landscape Design Plans;
• Three (3) sets Irrigation Design Plans;
• Three (3) sets Grading Design Plans;
• Three (3) sets Water Efficient Landscape Worksheet;
• Three (3) sets Soil Management Plan; and
• Payment of Plan Check fee.
All contract documents are subject to review (plans, general conditions of contract, specifications, etc.).
All plans are to be checked by the Engineer of Work for consistency, accuracy, clarity and conformity with City standard details, drawings, an d design criteria before submission for 13 approval. If during initial review by the City, the Landscape Documentation Package is found to be incomplete, it will be returned unchecked to the Engineer of Work for completion.
2. Subsequent Review Submittal
Submit subsequent corrected Landscape Documentation Package’s to the appropriate department.
Upon approval of the Landscape Documentation Packag e by the City, plans stamped "approved" will be returned to the owner or Engineer of Work.
3. Approved Drawings
All landscape plans must receive City approval prio r to approval of the subdivision map by City Council. During the progress of the constru ction, the Developer's Contractor shall keep a print set copy of signed plans and permit on the job at all times for “As- Built” construction purposes.
Prior to approval for occupancy of any housing unit in a subdivision, the landscape area required for the Landscape Maintenance District shall be installed and accepted by the City.
B. LANDSCAPE AND IRRIGATION PLANS
1. Landscape Documentation Package
The Landscape Documentation Package shall include all of the following elements:
a) Water Efficient Landscape Worksheet
1) Section A - Project Information and Checklist
2) Section B - Water Use Efficiency Statement
3) Section C - Water Budget Calculation
(a) Section C1 - Maximum Applied Water Allowance (MAWA) (b) Section C3 - Estimated Water Use (EWU) for Hydrozon es and Estimated Total Water Use (ETWU)
4) Section D - Hydrozone Information
(a) Section D1 - Hydrozone Map
(b) Section D2 - Hydrozone Table
(c) Section D3 - Hydrozone Calculation Summary
b) Soil Management Plan
1) Soil Analysis Report
2) On-Site Soil Assessment with Recommendations
(a) Landscape Design Plan
(b) Irrigation Design Plan
(c) Grading Design Plan
Forms can be found in Appendix B.
14 The landscape plans and documents being submitted in response to a City requirement must be for the complete area of the project. For example, if a tentative map requirement calls for a landscape plan submitted for review and approval prior to rec ordation of the final map, then the plan which is submitted will be for the total area covered within the final map. The landscape plan specifically cannot be submitted piecemeal as in construction or other type phasing. The landscaping can be installed in phases and/or shown in phases on the o verall map, but the entire plan must be submitted.
• Standard size sheets shall be used for all plans submitted. All plans shall be of the same size.
• Incomplete designs, details, etc., will not be acce pted. Checking will be done only on plans which are complete in all phases of design.
• Number sheets consecutively, "Sheet of ."
• Scale: 1" = 20' only, unless prior approval by City. Scale shall appear on each sheet. • "North" arrow shall appear on each sheet. North shall be to top of sheet or to left of sheet.
• Show all match lines clearly and label to provide easy plan reference. • Vicinity map shall appear on title sheet and identify streets within the project and those directly adjacent to the project.
The following items related to landscape and irriga tion development shall appear on all plan sheets:
• Property lines/project limits, street names;
• Building areas, existing and proposed paved areas ( including street sidewalks), ponds, and water features;
• All walls and fences (including gates) to be constructed by developers:
• Other appropriate information (utilities, casements , street lights, fire hydrants, etc.) as they relate to landscape development; and
• Designated recreational areas.
Should revisions be made to plans after approval by the City, such revisions shall be approved by the City and noted on the Title Sheet prior to implementation in the field.
2. Cover/Title Sheet
The first sheet shall be a Title Sheet and shall include:
a) Project location on location map;
b) Vicinity map showing the following:
1) Street configuration within or adjacent to the tract or project; 2) Nearest arterial highway intersection: and
3) Street names.
15 c) North arrow Graphic indication of the following:
1) Match lines, if applicable;
2) Project limits;
3) Sheet index; and
4) Plan indicating portion of project each sheet covers. d) Title Block to contain the following:
1) Project title;
2) Subdivision number (tentative tract) and parcel map if drawings reflect only a portion of the complete development. These specific reference numbers shall conform to the approved subdivision map; and
3) Project address and cross streets.
e) Block for City Approval, including space for signature of approval and date; f) Engineer of Work's firm name, address, telephone nu mber, date plans prepared, signature, and seal of Registered Landscape Architect; and g) Owner/Developer's name, address, and telephone number.
3. Plan Sheets
a) Grading
1) Indicate existing and proposed grades with contours and spot elevations. 2) No slope in turf or planter areas shall exceed 5:1 or 20%. 3) Note all grades, flow lines, etc., within public right-of-way. 4) Bike Grades: 10% maximum slope.
5) Handicap Grades: 12 - 1/2% maximum slope.
6) Minimum grade within landscaped areas: 2%.
7) Parkway and common areas where drainage is to be al lowed to drain directly onto private property must be accomplished to the satisfaction of the Building and Safety Official. Subsurface drains shall connect into stor m drain system or through curb- face.
8) All grading and drainage within public right-of way shall be subject to approval by the City Building and Safety Official.
b) Crossings
All pedestrian, equestrian, and bicycle trails whic h cross arterial or collector streets shall receive appropriate signs, stripes, and pavement markings per State of California Standards and City Traffic Division Standards. Use of stamped concrete, various enriched paving, etc., shall require approval of City Building and Safety Official. c) Trails/Walks
1) Equestrian Trails - Owner shall develop all trails including approved fencing or walls in accordance with City requirements applicable to the project. 2) Non-expansive soil - Scarify trail area to a depth of 6", removing rocks, clods, and all undesirable material. Apply approved soil steri lant, fine grade, and compact native soils to the satisfaction of the Building and Safety Official. 3) Bike Trails - In expansive soils, soil tests may be required in areas where bike trails are planned.
16 4) Pedestrian Trails/Walks - Concrete walks shall be c onstructed per City Building and Safety Official's requirements, with a 4 foot m inimum width if parkway is between curb and sidewalk, and a 5 foot maximum wid th when adjacent to curb.
Where tree wells occur within the sidewalk area, a 4 foot width must be maintained between tree well and back of sidewalk.
d) Fencing/Walls
1) Equestrian - Shall be constructed per City standard details and shall occur on both sides of trails unless approved otherwise by the City Building and Safety Official. 2) Walls - All free-standing block masonry perimeter walls shall be a maximum of six feet in height per City standard detail and submitt ed to Development Engineering Division for approval. Any walls retaining soil shall be subject to permit review by the City.
e) Lighting
Wherever possible, lighting designed to accent landscaping, buildings, signs, etc., shall be located on private property. Any lighting system s to be located within the public right-of-way shall be designed by a Registered Elec trical Engineer or, upon approval of the City, by a Licensed Electrical Contractor (S tate of California). Electrical plans shall be submitted with standard landscape plans an d shall be subject to approval by the City.
f) Street Trees
All trees planted within the dedicated right-of-way shall be of an approved species.
Street trees shall conform to the City’s Plant List , Appendix G. Plans (two sets) shall be submitted to the City for approval of tree species and quantity to be planted.
g) General Design Guidelines
1) Turf grass limitations
(a) Single Family Residential - 2 5 % of landscape area m aximum, arranged in recreational areas no less than 8 feet wide and areas less than 200 square feet.
(b) Commercial & Institutional - NO turf grass allowed, except in approved recreational areas.
2) 80% shrub/ground cover canopy coverage in the planters. If no lawn is used, the plant canopy coverage may be reduced to 50%.
3) A separate water meter for the landscape is required. 4) An approved ETo timer as set forth by these design standards. 5) Street tree(s), as set forth in these design standards.
4. Irrigation
A. General
The following guideline is to aid in the preparatio n of landscape irrigation drawings for practices and materials most commonly encountered i n the field. However, any special conditions, which the Engineer of Work or the owner finds during the process of design drawings or field investigation not covered by thes e design standards, shall be submitted 17 to the City at the earliest possible date. Plan rev iew by City staff may allow for variances where appropriate and justified.
B. Specific
Provide a complete automatic landscape sprinkler irrigation design for all landscaped areas as required as a part of the project development. T he irrigation system shall be designed in compliance with the Uniform Plumbing Code most r ecently adopted by the City, and these design standards.
1) The landscape irrigation system shall be designed a nd operated to prevent runoff and discharge of irrigation water onto roadways, si dewalks, driveways, adjacent properties, and all areas not under City jurisdiction.
2) Landscape areas less than 10 feet in width in any d irection shall be irrigated with subsurface irrigation or other means that produces no water waste, runoff or overspray.
3) Included on the irrigation drawings shall be a comp lete and comprehensive irrigation legend, indicating sprinkler head manufa cturer and model number. All other equipment and materials utilized in the design shall also be included as a part of the irrigation legend and shall indicate the fol lowing: manufacturer, model number, size, and brief description.
4) Indicate locations of irrigation water meters, irri gation points of connection, and electrical points of connection for automatic sprinkler controllers, electrical meter, and backflow prevention device on the irrigation drawings. 5) The following information shall be provided at each irrigation water meter or irrigation point of connection:
(a) Static and residual water pressures;
(b) Meter size;
(c) Peak irrigation demand in gallons per minute; and
(d) Finished grade at backflow unit and highest head served. 6) Submit pressure calculations for worst hydraulic co ndition at each point of connection. Water movement in system shall not-exce ed 5' per second. 7) All irrigation systems shall be designed to minimiz e vandalism with special attention at schools, parks, along trails, roads, walks, etc. 8) Irrigation water system shall be designated to meet the peak moisture demand of all plant materials used within the design area.
9) Provide construction details indicating installatio n procedures and materials required for the installation of all major components used in the irrigation design in accordance with City standard details, Appendix G.
10) Provide check valves and/or anti-drain valves to pr event drainage of irrigation water from sprinkler system due to changes in elevation. 11) Provide anti-drain sprinkler heads along all sidewalks and driveways. 12) Valves are to provide uniform coverage and G.P.M. f rom control valves in each system.
(a) A shut off valve will be installed to isolate the i rrigation system from the household water.
13) Slope Condition - Provide separate control valves f or sprinkler lines operating systems of slopes. Sprinkler lines shall run parall el (or as close as possible) to contour lines.
18 14) System Pressure - Design systems to the lowest static pressure available, less 20% cushion for further system fluctuations.
(a) The maximum potential pressure should be considered in the design and regulators provided if required. If water pressure exceeds 80 psi, install pressure reducing valve(s) to maintain water pressure at no more than 20% higher than system design pressure.
15) A reduced pressure backflow preventer will be required. 16) Turf sprinklers shall be pop-up. Sprinklers shall b e 6" or 12" to minimize safety hazards and vandalism.
17) Provide separate valving in landscape areas for:
(a) Turf along wall;
(b) Turf along walk;
(c) Shrub beds along walk (spray);
(b) Shrub beds along wall (spray);
(d) Tree bubblers;
(e) Shade areas that freeze and do not thaw in winter; (f) Slopes;
(g) Trees in tree wells;
(h) Ground cover in tree wells;
(i) Special planters;
(j) Drip systems; and
(k) Differing hydrozones.
C. Plant Selection and Spacing
1) General
(a) 80% plant canopy coverage in the planters. The plan t list contains appropriate plants and canopy coverage area. If no lawn is used, the plant canopy coverage may be reduced to 50%.
(b) The square footage value given for each plant is its mature size and will be used to determine the canopy coverage regardless of the size of the plant at the time of planting.
(c) The City does not endorse or require the use of any or all plants found on the list.
(d) All ornamental planting of trees/shrubs shall be in accordance with the appropriate City ordinances and conditions.
(e) In no event shall trees or ornamental landscaping be placed so as to obstruct the vision of drivers and/or pedestrians within pub lic right- of- way. Refer to line-of-sight requirements and details.
(f) All plant material shall be of an appropriate speci es to survive in this particular zone and climate. The City will consider alternative plant material on a case by case basis. Final approval of plant material will be at the discretion of the City.
(g) Plants shall be selected appropriately based upon t heir adaptability to the climate, geologic, topographical, and hydrological, and soil conditions of the site.
19 (h) Plants having similar water use requirements shall be irrigated together on distinct hydrozones specific valves.
(i) Planting symbols shall be clearly drawn at and plan ts labeled by botanical name, common name, container size, spacing, and qua ntity of each group of plants indicated.
2) Street Trees
(a) Minimum acceptable size of trees shall be 15 gallon container size. (b) Minimum 30' on center, each side of street as a solitary planting (c) 20' from street light standards.
(d) 10' from fire hydrants.
(e) 10' from walks or driveways.
(f) 5' from water meters.
3) Trees to be planted within dedicated City right-of-way. (a) Trees planted within City right-of-way will be pre-approved by the City from the List of Acceptable Trees for Street Tree Planting. (b) Root barriers shall be provided where required by Section 8.50.090 of the Lancaster Municipal Code and Section I, Part B, E.8 of these Design Standards.
4) Shrubs
(a) Shrubs used for all except ground cover purposes shall be a minimum of five (5) gallon size.
5) Ground Cover
(a) Container stock used for ground cover shall be either:
(1) One (1) gallon size at two (2) to three (3) feet on center; or (2) Flatted ground cover material shall be planted six (6) inches on center.
6) Turf
(a) Sod is required for lawn planting.
7) Graphics/Signage
(a) All graphics and signing systems within public righ t-of-way for housing usage shall be subject to approval by the Planning Director and shall be in accordance with appropriate City zoning ordinances.
8) Zoning Ordinance
(a) City Zoning Ordinance - All ornamental landscaping, both on private property and within public right-of-way, shall comp ly with City Zoning Ordinance in all respects (open space requirements, fencing, front and side yard landscaping, etc.).
C. WATER EFFICIENT LANDSCAPE WORKSHEET
A project applicant shall complete the Water Effici ent Landscape Worksheet that contains four (4) sections to meet the criteria and specific ations of the ordinance. See sample worksheet in Appendix B.
1) Section A shall contain general project information and a checklist of the required elements.
2) Section B shall contain the Water Use Efficiency St atement, which is a narrative summary of the water use efficiency practices applied in the landscape project. 20 3) Section C shall contain a water budget calculation for the project. For the calculation of the MAWA, a project applicant shall use the ETo values from Reference ETo Table in Appendix A.
The example calculations below are hypothetical to demonstrate proper uses of the equations and do not represent an existing and/or planned landscape project. The ETo values used in these calculations are historical data for planning purposes only. For actual irrigation scheduling, a project applicant shall use current reference evapotranspiration (ETo data, such as from the California Irrigation Management Information System (CIMIS) or other self-adjusting device (i.e., soil moisture sensor).
Also, monthly time steps are used for demonstration purposes only. A project applicant may use a time step of their choice (daily, weekly, biweekly, etc.) to complete these calculations.
1. Section C1 Maximum Applied Water Allowance (MAWA). The landscape project’s Maximum Applied Water Allowance shall be calculated using this equation:
MAWA= (ETo) (0.55) (LA) (0.62)
Where:
MAWA = Maximum Applied Water Allowance (gallons per year) ETo = Reference Evapotranspiration Appendix A (inches per year)
0.55 = ET Adjustment Factor (0.45 for nonresidential landscape areas) LA = Landscaped Area (square feet)
0.62 = Conversion factor (to gallons per square foot)
a. Example MAWA calculation: A hypothetical landscape project in Lancaster, California with an irrigated landscape area of 4,000 square feet. To calculate MAWA, the annual ETo value for Lancaster is 65.3 inches as listed in the Reference Evapotranspiration Table in Appendix A
MAWA = (ETo) (0.55) (LA) (0.62)
MAWA = (65.3 inches) (0.55) (4,000 square feet) (0.62)
= 89,069 gallons per year
To convert from gallons per year to hundred-cubic-feet per year =89,069/748 = 119 hundred-cubic-feet per year
(100 cubic feet = 748 gallons)
2. Section C2 Estimated amount of water expected from Effective Precipitation (Eppt.).
The City’s annual precipitation is not significant enough to count for this portion of the equation.
3. Section C3 Estimated Water Use (EWU) for a hydrozone and Estimated Total Water use (ETWU). The landscape project’s EWU for each hydrozone is calculated using the following equation:
21 Where:
(ETo) (PF) (HA) (0.62)
EWU = (IE)
EWU = Estimated total water use for a hydrozone (ga llons) ETo = Reference evapotranspiration Appendix A (inch es per month)
PF = Plant Factor
HA = Hydrozone area (square feet)
0.62 = Conversion Factor
IE = Irrigation efficiency
a. Example EWU calculations for three (3) hydrozones; the hypothetical Landscape project in Lancaster, California from the previous section. The following assumptions are made for the landscape: t here are three hydrozones – one each for high, moderate, and low water using plants; each hydrozone has the same irrigation type; and soil characteristics and slopes are uniform over the total landscape area.
Hydrozone 1 – High water use plant. The following additional assumptions are made for the high-water using plant; landscape coefficient/plant factor is 0.7, landscape area is 1,000 sq. ft., and IE is 0.75.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total ETo 2. 4 2.9 4. 4 5. 8 7.3 8.5 9.3 8.6 6.6 4.6 2.9 2.1 65.3 PWR 1. 68 2. 03 3. 08 4. 06 5.11 5.95 6.51 6. 08 4.62 3.22 2.03 1. 47 45.84 IWR 2. 24 3. 12 4. 11 5.48 6.81 7.93 8.68 8.11 6.16 4.29 2.70 1.96 61.12 Total for Hydrozone 1 (=61.12 X 1,000 sq. ft), inches
61,120
Where:
ETo = Reference evapotranspiration Appendix A (inch es/monthly) PWR = Plant water requirement
= (ETo) (PF)
IWR = Irrigation water requirement
= (PWR)/(IE)
Hydrozone 2 – Moderate water use plant. The following assumptio ns are made: landscape coefficient/plant factor is 0.4; la ndscape area is 1,000 sq. ft.; and IE is 0.81
22 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total ETo 2.4 2.9 4.4 5.8 7.3 8.5 9.3 8.6 6.6 4.6 2.9 2.1 65.3 PWR 0. 96 1. 16 1. 76 2. 32 2.92 3. 4 3.72 3.44 2. 64 1.84 1.1 6 0.8 4 26.16 IWR 1. 19 1. 43 2. 17 2. 86 3.6 0 4. 20 4. 59 4. 25 3. 26 2. 27 1.4 3 1.0 4 32. 30 Total for Hydrozone 2 (=32.30 X 1,000 sq. ft.), inches
32,300
ETo = Reference evapotranspiration Appendix A (inch es/monthly) PWR = Plant water requirement
= (ETo) (PF)
IWR = Irrigation water requirement
= (PWR)/(IE)
Hydrozone 3 – Low water use plant. The following assumptions are made:
landscape coefficient/plant factor is 0.2; landscape area is 2,000 sq. ft.; and irrigation efficiency (IE) is 0.81.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total ETo 2.4 2.9 4.4 5.8 7.3 8.5 9.3 8.6 6.6 4.6 2.9 2.1 65.3 PWR 0.4 8 0. 58 0. 88 1.1 6 1. 46 1. 7 1.86 1. 72 1. 32 0.92 0.5 8 0. 42 13.08 IWR 0. 59 0.7 2 1. 09 1.4 3 1.8 0 2. 10 2. 30 2. 12 1. 63 1.1 4 0.7 2 0. 52 16. 15 Total for Hydrozone 3 (= 16.15 X 2,000 sq. ft.), in ches 32,300
Where:
ETo = Reference evapotranspiration Appendix A (inch es/monthly) PWR = Plant water requirement
= (ETo) (PF)
IWR = Irrigation water requirement
= (PWR)/(IE)
b. Example calculation ETWU. The ETWU for the landscape is the sum total of estimated water uses for each hydrozone:
ETWU = i=1 to n (EWU i)
Where:
i = hydrozone number
n = total number of hydrozones
ETWU = 61,120 inches + 32,300 inches + 32,300 inches
= 125,720 inches per year
23 To convert from inches per year to gallons per year:
= 125,720 X 0.62 = 77,946 gallons per year
Verify ETWU + Eppt is less than MAWA
77,946 + 0 < 89,069
ETWU + Eppt < MAWA, therefore water budget is acceptable.
c. Recreational areas (see definitions) and areas permanently and solely dedicated to edible plants, such as orchards and vegetable ga rdens, may require water in addition to the MAWA. A statement shall be included in the landscape design plan and the irrigation schedule designating those portions of the landscape to be used for such purposes and specifying any additi onal water needed above the MAWA. The total amount of irrigation water allo wed for these areas shall not exceed 1.0 of the ETo.
4. Section D shall contain hydrozone information for t he landscape project including a hydrozone map, hydrozone table, and hydrozone calcu lation summary. See sample worksheet in Appendix B.
D. COMPLIANCE WITH LANDSCAPE DOCUMENTATION PACKAGE
Prior to construction, the project applicant shall submit a Landscape Documentation Package to the City that meets all the criteria and specifications of this ordinance.
Upon approval of the Landscape Documentation Package by the City, applicant shall:
1. Receive a permit or approval of the plan check or design review and record the date of
the permit, etc. in the Certificate of Completion,
2. Submit a copy of the approved Landscape Documentation Package along with the record drawings, and any other information to the property owner or his/her designee; and
3. Submit a copy of the Water Efficient Landscape Work sheet to the local retail water purveyor.
24 PART B – IRRIGATION AND LANDSCAPING MATERIALS AND INSTALLATION
A. IRRIGATION - GENERAL
5. Irrigation Schedules
For the efficient use of water, all irrigation schedules shall be developed, managed, and evaluated to utilize the minimum amount of water required to maintain plant health. Irrigation schedules meeting the following requirements shall be submitted with the Certificate of Completion.
a) Irrigation scheduling shall incorporate the use of evapotranspiration data such as those from the California Irrigation Management Information Sy stem (CIMIS) weather stations or other validated weather data or soil moisture monit oring systems to apply the appropriate levels of water for different climates. See CIMIS d ata for Lancaster area in the City of Lancaster Landscape and Irrigation Design Standards.
b) Overhead irrigation shall be scheduled between 10:00 p.m. and 10:00 a.m. unless weather conditions are unfavorable. If allowable hours of i rrigation differ from the local retail purveyor, the stricter of the two shall apply.
c) For implementation of the irrigation schedule, part icular attention must be paid to the irrigation run times emission device, flow rate, and current ETo, so that applied water meets the EAWU. Total annual applied water shall be less than or equal to MAWA. d) Using an appropriate controller, an annual irrigati on program with monthly irrigation schedules shall be developed and submitted for each of the following:
(1) The plant establishment period;
(2) The established landscape; and
(3) Temporarily irrigated areas.
e) Each Irrigation Schedule shall include for each station all that apply:
(1) Irrigation interval (days between irrigation);
(2) Irrigation run times (hours or minutes per irrigation event to avoid runoff; (3) Number of cycle starts required for each irrigation event to avoid runoff; (4) Amount of applied water scheduled to be applied on a monthly basis; (5) Application rate setting;
(6) Root depth setting;
(7) Plant type setting;
(8) Soil type;
(9) Slope factor setting;
(10) Shade factor setting; and/or
(11) Irrigation uniformity or efficiency setting.
6. Permits and Fees
The Contractor shall obtain and pay for any and all necessary permits and fees as required. 25 7. Manufacturer’s Directions
Manufacturer’s directions and detailed drawings sha ll be followed in all cases where the manufacturers of articles used furnished directions covering points not shown in the drawings and specifications.
8. Ordinance and Regulations
All local, municipal, state laws, and rules and reg ulations governing or relating to any portion of irrigation work are hereby incorporated into and ma de a part of these design standards; and their provisions shall be carried out by the Contractor. Anything contained in these design standards shall not be construed to conflict with any of the above rules and regulations or requirements of the same. However, when these design standards call for or describe materials, workmanship, or construction of a better quality, higher standard, or larger size than is required by the above rules and regulations, the provisions of these design standards and drawings shall take precedence.
9. Explanation of Drawings
Due to the scale of drawings, it is not possible to indicate all offsets, fittings, sleeves, etc., whi ch may be required. The Contractor shall carefully inv estigate the structural and finished conditions affecting all of its work and plan its work accordi ngly, furnishing such fittings, etc., as may be required to meet such conditions. Drawings are generally diagrammatic and indicative of the work to be installed. The work shall be installed in such a manner as to avoid conflicts between irrigation systems, planting, and architectural features.
10. Contactor Responsibilities
a) It is the responsibility of the Contractor to famil iarize himself with all grade differences, location of walls, and utilities. The Contractor shall repair or replace all items damaged by its work. Contractor shall coordinate its work with other contractors for the location and installation of pipe sleeves and laterals under roadways and paving, etc.
b) Contractor shall be responsible for locating and st aking all sewer, utility, and water main lines prior to beginning work. Contractor shall be responsible for any damage or replacement of said utilities. Any digging in areas where public type utility substructures may exist requires an Underground Service Alert (US A). The alert must be obtained at least forty-eight (48) hours prior to digging. USA' s telephone number is 811. This will allow such utilities to mark their facilities to mi nimize interference and disruption of service.
c) Contractor shall not willfully install the irrigati on system as shown on the drawings when it is obvious in the field that unknown obstructions, grade differences, or differences in the area dimensions exist that might not have been cons idered in the engineering. Such obstructions or differences should be brought to the attention of the owner. In the event 26 this notification is not performed; the Contractor shall assume full responsibility for any revisions necessary.
d) The intent of the design is to provide adequate wat er coverage to plant material to insure survival. As part of the scope of work, Contractor shall provide any additional heads, special nozzles, or patterns to achieve proper coverage with a minimum of overspray, at no additional cost to the owner.
e) After all new sprinkler pipelines and risers are in place and connected, all necessary diversion has been completed, and prior to installation of sprinkler heads, the control valves shall be opened and a full head of water used to flush out the system.
B. IRRIGATION – SUBMITTALS
1. Materials List
The Contractor shall furnish the articles, equipment, materials, or processes specified by name in the drawings and specifications. No substitution will be allowed without prior written approval by the Director. Equivalent equipment, materials, or processes must meet or exceed the City's minimum material, dimensional, and performance requirements.
Equipment or materials installed or furnished witho ut prior approval of the City may be rejected and the Contractor required to remove such materials from the site at its own expense.
Manufacturer's warranties shall not relieve the Con tractor of its liability under the guarantee.
Such warranties shall only supplement the guarantee.
2. Records and As-Built Drawings
The Contractor shall provide and keep up-to-date co mplete “As-Built” drawings indicating locations, sizes, and kinds of equipment installed. Prints for this purpose may be obtained from the Architect at cost. This set of drawings shall b e kept on the site and shall be used only as a record set.
These drawings shall also serve as work progress sh eets and the Contractor shall make neat and legible annotations on a daily basis as the wor k proceeds, showing the work as actually installed. These drawings shall be available at all times for inspection and shall be kept in a location designated by the City.
Before the date of the final inspection, the Contra ctor shall turn over all information recorded on the “As-Built” prints to the Engineer of Work.
The Contractor shall dimension from two (2) permanent points of reference (building corners, sidewalk, or road intersections, etc.) the location of the following items:
a) Connection to existing water lines;
b) Connection to existing electrical power;
27 c) Gate valves;
d) Routing of sprinkler pressure lines (dimension maximum 100' along routing); e) Significant changes in routing of lateral lines from those indicated on plans; f) Sprinkler control valves;
g) Routing of control valves;
h) Quick coupling valves; and
i) Other related equipment as directed by the City.
C. IRRIGATION – MATERIALS
Use only new materials on drawings, specified herein, or approved equals.
1. PVC Pressure Mainline Pipe and Fittings
The Contractor is cautioned to exercise care in han dling, loading, unloading, and storing of PVC pipe fittings. All PVC pipe is to lie flat so a s not to subject it to undue bending or concentrated external load at any point. Any sectio n of pipe that has been dented or damaged will be discarded and, if installed, shall be repla ced with new piping. Pipe and fittings shall not be stored in direct sunlight.
a) Rubber gasket type pressure main line piping for si zes 3" and larger shall be Ring-Tite PVC Class 200.
b) Pipe shall be made from NSF approved Type I, Grade I, PVC Compound conforming to ASTM Resin Specifications D1784. All pipe must meet requirements as set forth in Federal Specifications PS-22-70, with an appropriat e standard dimension (S.D.R.) (Ring-Tite Pipe).
c) Ring-Tite PVC fittings shall be fabricated from Sch edule 40, 1-2, II-I NSF solvent weld PVC fittings conforming to ASTM Testing Procedure D -2466 and PVC Ring-Tite bell adapted using solvent and solvent welding procedures recommended by the manufacturer. d) Fabrication shall be performed at the manufacturer' s plant location or at an authorized distributor shop location. Field fabrication of Rin g-Tite fittings will not be allowed. e) Solvent welded type pressure main line piping for s izes 2" and larger shall be PVC Class 315.
f) Pipe shall be made from NSF approved Type I, Grade I PVC Compound conforming to ASTM Resin Specifications D1788. All pipe must meet requirements as set forth in Federal Specification PS-22-70, with an appropriate standard dimension (S.D.R.) (Solvent- weld Pipe).
g) Pressure main line piping for sizes 1½” and smaller shall be PVC Schedule 40 with solvent welded joints.
h) Pipe shall be made from NSF approved Type I, Grade I PVC Compound conforming to ASTM Resin Specification 1785. All pipe must meet r equirements as set forth in Federal Specification PS-21-70 (solvent weld pipe).
i) PVC solvent weld fittings shall be Schedule 40, NSF approved, conforming to ASTM Test Procedure D2466.
j) Solvent cement and primer for PVC solvent weld pipe and fittings shall be of type and installation methods prescribed by the manufacturer.
k) All PVC must bear the following markings:
(1) Manufacturer's name;
28 (2) Nominal pipe size;
(3) Schedule or class;
(4) Pressure rating psi;
(5) NSF (National Sanitation Foundation) approval.;
(6) Date of extrusion;
(7) U P.C. Shield Logo (IAPMO approval); and
(8) All fittings shall bear the manufacturer’s name or trademark, material designation, size, applicable I.P.S. schedule, and NSF seal of approval.
2. PVC Non-Pressure Lateral Piping
a) Non-pressure buried lateral line piping shall be PVC Class 200 with solvent weld joints. b) Pipe shall be made from NSF approved, Type I, Grade II PVC Compound conforming to ASTM Resin Specification Dl784. All pipes must meet requirements set forth in Federal Specification PS-22-70 with an appropriate standard dimension ratio. c) Except as noted in Paragraph l of PVC Pressure Main Line Pipe and Fittings, all requirements for non-pressure lateral line pipe and fittings shall be the same as for solvent weld pressure main line pipe and fittings as set forth in said section.
3. Brass Pipe and Fittings
a) Where indicated on the drawings, use red brass scre wed pipe conforming to Federal Specification WW-P-351.
b) Fittings shall be red brass conforming to Federal Specification WW-P 460.
4. Galvanized Pipe and Fittings
a) Galvanized pipe and fittings shall not be allowed under any circumstances without prior written approval from the City.
5. Copper Pipe and Fittings
a) Copper pipe shall be Type "K", hard tempered ASTM B 88 and fittings shall be wrought solder joint type in accordance with ASNI-B 16-22.
b) Joints shall be soldered with silver solder, 45% si lver, 15% copper, 16% zinc, 24% cadmium and solidus at 1,125 F and liquidus at 1,14 5 F, conforming to ASTM B206 and Federal Specification QQB 00655.
6. Thrust Blocks
a) Concrete thrust blocks for all specified piping sha ll be the size and type required by the manufacturer's installation guide.
b) Form thrust blocks in such a manner to prevent any concrete from coming in contact with the pipe. Solid pipe shall be between thrust block and the fitting to prevent direct contact of thrust block and fitting.
c) Thrust blocks shall be installed on all pressure li nes over 1½” in diameter whenever pressure line changes direction. Thrust blocks are required at backflow prevention device.
29 7. Quick Coupling Valves
a) Quick coupling valves shall have a two-piece brass body designed for working pressure of 150 psi operable with quick coupler.
b) Quick coupling valves shall be 1" in size and shall be equipped with a locking vinyl cover.
8. Backflow Prevention Units
a) Backflow preventers shall be a reduced pressure type and shall be of a size as indicated on the drawings. All sprinkler irrigation systems shal l require backflow prevention. All backflow prevention units shall be as set forth by local codes, the Los Angeles County Health Department, and Water District. The device shall be installed at least twelve inches (12”) above grade measuring from the bottom of the device. (Current Los Angeles County Codes and Inspections required).
b) Wye strainers at backflow prevention units shall have a bronzed screwed body for sizes 2" and smaller and 125 lb. cast iron flange body for s izes 2 " and larger. All wye strainers shall have a minimum 30 mesh screen and shall be si milar to Bailey #100B or approved equal. Wye strainer shall not have a hose bib and s hall be installed as per standard details.
Smaller mesh screens may be required as necessary.
c) Backflow prevention devices shall have a minimum si ze equal to the size of the water meter.
d) The backflow device shall be wrapped/winterized.
e) The backflow device shall be secured within an appr opriately sized solid, insulated steel enclosure and powder coated tan.
f) The backflow prevention device must be tested and c ertified by the Los Angeles County Department of Health Services - Cross Connections and Water Pollution Control Program and a copy of the test report submitted to the City.
9. Gate Valves/Ball Valves
a) Gate valves 2½” and larger shall be iron body, bron ze stem, flanged, full port, resilient seat, or wedge shut-off which can be serviced from the top while the valve is in line. b) Gate valves 4" and larger shall have 2" square oper ating nut, with arrow cast in metal indicating direction of opening.
c) Gate valves 4" and larger shall have ends compatible with pipe in which they are being installed.
d) Ball valves 2" and smaller shall be 200 psi SWP bronze ball valve with a stainless steel ball and handle.
e) Ball valves 2" and smaller shall have threaded ends. f) All gate and ball valves shall be installed per standard details.
10. Control Wiring
a) The electrical system shall be installed in accorda nce with the National Electrical Code most recently adopted by the City. Connections betw een the automatic controllers and the electric control valves shall be made with direct b urial copper wire AWG-U.F. 600 volt.
Pilot wires shall be a different color wire for eac h automatic controller. Pilot wires for single controller installations shall be black, 14 gauge minimum.
Common wires shall be white with a different color stripe for each automatic controller.
Common wires shall be installed in accordance with valve manufacturer’s specifications and wire chart. In no case shall wire size be less than #14. 30 b) Wiring shall occupy the same trench and shall be installed along the same route as pressure supply or lateral lines wherever possible.
c) Where more than one (1) wire is placed in a trench, the wiring shall be taped together at intervals of ten (10) feet.
d) An expansion curl should be provided within three (3) feet of each wire connection and at each change in direction. Expansion curls shall be formed by wrapping at least five (5) turns of wire around a one-inch diameter pipe, then withdrawing the pipe. e) All splices shall be made with waterproof connectors. f) Field splices between the automatic controller and electrical control valves will not be allowed without prior approval of the City.
g) Where additional stations remain on controller, up to two (2) additional wires may be required by the City. These wires shall be pulled t o the farthest point in the project and coiled in a pull box for future use.
11. Smart Controller Specification
a) All irrigation controllers shall meet the Irrigatio n Association's protocol for Smart Controllers (SWAT protocol report, www.irrigation.org). b) The performance standard for the Smart Water Irriga tion Technologies (SWAT) protocol product report shall be 100% Adequacy and 0% Excess scores in order for the City to maximize water use efficiency and runoff reduction.
c) The SWAT reported technology shall include an autom ated "scheduling engine" that changes irrigation schedules as weather changes without the need for people interactions. d) The SWAT reported technology shall have sufficient independent "field" tests and studies that validate the SWAT bench test protocol report.
e) The SWAT reported technology shall be specifically tested for runoff reduction by an independent agency study that validates success in controlling non point-source water pollutants.
f) The SWAT reported technology shall utilize real-tim e localized weather data that establishes daily ET for the varied City microclimates; ET data must match/conform to the State and Federal accepted Penman Montieth ET equat ion data, and may not be based on historical ET, single weather sensors, or individua l non-government maintained weather collection devices that will need ongoing maintenance.
g) Training/Product Service: Approved controllers/manufacturers shall include training (City staff, contracted landscapers) and be able to perform ongoing customer service in order to achieve long-term water conservation and runoff goals.
h) Connectivity: Subscription services for cellular m odem(s) and/or central control services shall be pre-paid for 10 years and activated at time of turn-over to maintenance.
12. Electric Control Valves
a) The electric control valve shall be a normally closed, 24-volt, 60 cycle valve. b) The valve shall have a slow uniform closure to eliminate water hammer or chatter. c) All valves shall have a manual flow adjustment.
d) Valve shall be pressure rated to 150 psi.
13. Outdoor Automatic Controller Enclosure
a) The outdoor controller enclosure shall be of appropriate size to adequately house specified controller. Constructed of 12-gauge 304 stainless steel with a natural brush finish.
Concealed locking latch and hinged doors shall be e quipped with full length stainless steel piano 31 hinge. All sides of door shall have weather stripping to provide a water-tight seal.
14. Control Valve Box (only for in-ground valves)
a) If in-ground valves are used, an irrigation valve box must be used. The valve box shall be large enough for easy access to the valves.
b) Valve box shall have a tan color lid unless it is a reclaimed water system, then the lid shall be purple.
15. Sprinkler Heads
a) General
1) All sprinkler heads shall be of the same size, type , and shall deliver the same rate of precipitation with the diameter (or radius) of thro w, pressure, and discharge as shown on the plans.
2) Spray heads shall have a screw adjustment.
3) Riser nipples for all sprinkler heads shall be the same size as the riser opening in the sprinkler body.
4) All sprinkler heads of the same type shall be of the same manufacturer. 5) All sprinkler heads shall have low precipitation ra te and a spray angle less than 10 degrees.
a. Type "A" Pop-Up Lawn Spray
I. Pop-up lawn spray heads shall have a minimum 6” pop-up nozzle piston with a stainless steel retraction spring. The sprin kler body shall be manufactured of a corrosion resistant material such as high strength, ultra-violet, and impact resistant plastic.
II. Nozzles for 6” pop-up lawn spray sprinklers shall b e of plastic construction and shall be adjustable.
b. Type “B” Pop-Up Shrub Spray
I. Pop-up shrub spray heads shall have a minimum, 12” pop-up nozzle piston with a stainless steel retraction spring. Th e sprinkler body shall be manufactured of a corrosion resistant material such as high strength, ultra-violet, and impact resistant plastic.
II. Nozzles for 12” pop-up spray heads should be used within low growing ground cover areas only, and shall have an adjustable radius. c. Type "C" Bubbler
I. Bubblers to be pressure compensating type, pre-set gallonage.
II. Bubblers are to be installed on ½” fixed risers wit h threaded ends.
Risers shall be UV resistant PVC, Sch 40 or Sch. 80.
III. All shrub bubblers shall be installed a maximum of 2” above grade.
16. Booster Pump
a) Pump shall be equipped with tapped holes for pressure gauges on suction and discharge posts of pump.
b) All fittings shall be brass.
c) Suction line assembly shall be sized the same as the pump suction inlet. d) All pumps shall be equipped with a pump panel withi n 10 feet of pump location. Pump panel shall be housed in a lockable, weatherproof enclosure with the following components:
(1) HOA (Hand, Off, Automatic) switch. "Hand" position shall be spring loaded to return to "Off" position;
32 (2) 24 volt transformer; and
(3) Minimum run timer with settings from 0-10 minutes. e) Irrigation plan submittals shall include a complete detailed drawing of pump assembly and all electrical installation from electric meter through panel and to pump motor. f) All booster pumps and electric panels shall have a slump stone, or approved equal, block wall installed around them for anti-vandalism as well as aesthetic purposes.
D. IRRIGATION-INSTALLATION PROCEDURES
1. Site Conditions
a) Exercise extreme care in excavating and working nea r existing utilities. Contractor shall be responsible for damages to utilities which are caused by its operations or neglect. Check existing utilities drawings for existing utility lo cations. Call out mark-out crews for each utility.
b) Coordinate installation of sprinkler irrigation materials, including pipe, so there shall be no interference with utilities or other construction, or difficulty in planting trees, shrubs, and ground covers.
c) Carefully check all grades to satisfy itself that i t may safely proceed before starting work on the sprinkler irrigation system.
2. Water Supply
a) Sprinkler irrigation system shall be connected to w ater supply points of connection as indicated on the drawings.
b) Contractor is responsible for minor changes by actual site conditions.
3. Trenching
a) Dig trenches straight and support pipe continuously on bottom of trench. Lay pipe to an even grade. Trenching excavation shall follow layou t indicated on drawings and as noted. b) Provide a minimum of 18" of cover for all pressure supply lines 1½" and smaller. c) Provide a minimum cover of 12" for all non-pressure lines. d) Provide a minimum cover of 18" (or directly below mainline where possible) for all control wiring.
4. Backfilling
a) The trenches shall not be backfilled until all requ ired tests are performed. Trenches shall be carefully backfilled with the excavated materials approved for backfilling, consisting of earth, loam, sandy clay, sand, or other approved materials, free from large clods of earth or stones. Backfill shall be compacted in landscaped a reas to a dry density equal to adjacent undisturbed soil in planting areas. Backfill will c onform to adjacent grades without dips, sunken areas, humps, or other surface irregularities.
b) If settlement occurs, all subsequent adjustments in pipe, valves, sprinkler heads, lawn or plantings, or other construction necessary, the Con tractor shall make all required adjustments.
5. Trenching and Backfill Under Paving
a) Generally, piping under existing walks may be accom plished by jacking or boring; but where any cutting or breaking of sidewalks and/or c oncrete is necessary, it shall be done and replaced by the Contractor as part of the contract cost. b) Provide for a minimum cover of 18” between the top of the sleeve and the bottom of the 33 aggregate base for all pressure and non-pressure pi ping installed under asphaltic concrete paving. All sleeves under paving shall be Schedule 40 PVC. Sleeves shall be installed under all paving/concrete areas. Provide sleeve a minimum of 2 times the diameter of water pipe for irrigation pipe, 1" sleeve for wires.
c) All control wire installed where mainline is not called for shall be installed in Schedule 40 PVC conduit.
6. Automatic Controller
a) Install as per manufacturer's instructions. Remote control valves shall be connected to controller in numerical sequence as shown on the drawings. b) Installer must be certified by the manufacturer to install their ETo Timers.
7. High Voltage Wiring for Automatic Controller
a) 120 volt power connection to the automatic controller. b) All electrical work shall conform to local codes, o rdinances, and authorities having jurisdiction.
c) Timers installed outdoors must be direct wired.
8. Remote Control Valves
a) Install as per manufacturer's instructions.
b) Install where shown on drawings and details.
c) Valves to be located in planters.
9. Lawn Sprinkler Heads
a) Install the sprinkler heads as designated on the dr awings. Sprinkler heads to be installed shall be equivalent in all respect to those itemized on plans and in details. b) Spacing of heads shall not exceed the maximum indicated on the drawings. In no case shall the spacing exceed the maximum recommended spacing by the manufacturer for wind speeds at 3-5 miles per hour.
c) Heads shall be placed around the perimeter of the t urf areas directing spray into the turf area. Use full head sprays to water the middle of l awn areas. Irrigation efficiency shall be uniform and meet or exceed 85 percent.
d) Sprinklers shall not be installed any closer than t wo inches from hard surface edges and lawn edges.
e) The cap height of pop-up sprinklers, mounted in tur f areas, should be at grade level, to avoid damage to lawn mowers. There should be no dep ression around sprinkler heads. f) All sprinkler heads shall be set perpendicular to f inished grades unless otherwise designated on the plans.
g) The Contractor shall flush and adjust all sprinkler heads for optimum performance and to prevent overspray onto walks, roadway, and buildings as much as possible. h) If it is determined that adjustments in the irrigation equipment are needed to provide proper and more adequate coverage, the Contractor shall make such adjustments prior to planting.
Adjustments may also include changes in nozzle sizes and degrees of arc as required. 34 10. Shrub Sprinkler Heads
a) Install the sprinkler heads as designated on the dr awings. Sprinkler heads to be installed shall be equivalent in all respect to those itemized on plans and in details. b) Spacing of heads shall not exceed the maximum indicated on the drawings. In no case shall the spacing exceed the maximum recommended spacing by the manufacturer for wind speeds at 3-5 miles per hour.
c) Sprinklers shall face away from the house and hard surfaces to prevent water spray on house and hard surfaces.
d) Sprinklers shall not be installed any closer than t wo inches from hard surface edges and lawn edges.
e) The cap height of pop-up sprinklers shall be at finished grade plus height of mulch. There should be no depression around sprinkler heads.
f) All sprinkler heads shall be set perpendicular to f inished grades unless otherwise designated on the plans.
g) The Contractor shall flush and adjust all sprinkler heads for optimum performance and to prevent overspray onto walks, roadway, and buildings.
h) If it is determined that adjustments in the irrigat ion equipment are necessary to provide proper and more adequate coverage, the Contractor s hall make such adjustments prior to planting. Adjustments may also include changes in n ozzle sizes and degrees of arc as required.
11. Existing Trees
a) Where it is necessary to excavate adjacent to exist ing trees, the Contractor shall use all possible care to avoid injury to trees and tree roots. Excavation in areas where 2" and larger roots occur shall be done by hand. All roots 2" and larger in diameter, except directly in the path of pipe or conduit, shall be tunneled unde r and shall be heavily wrapped with burlap to prevent scarring or excessive drying. Whe re a ditching machine is run close to trees having roots smaller than 2" in diameter, the wall of the trench adjacent to the trees shall be hand trimmed, making clean cuts. Trenches adjacent to trees should be filled within twenty-four (24) hours; and where this is not possible, the side of the trench adjacent to the tree shall be kept shaded with burlap or canvas. b) Root pruning, and root-management activities shall conform to the current applicable ANSI A300 standards and International Society of Arboriculture Best Management Practices, except where these Design Standards or the Lancaster Municipal Code establish a more stringent requirement.
c) Where an existing tree is causing or contributing t o damage to a sidewalk, curb, gutter, pavement, wall, utility, or other improvement, the City may require installation of a root barrier or other approved root-management measure w hen determined to be technically appropriate. Installation shall be performed in a m anner that minimizes damage to the existing tree and shall comply with applicable City requirements and recognized arboricultural practices. Also refer to Section I, Part B, E. Landscaping Materials, Item 8 -Trunk Guards/Root Barriers.
12. Inspection Schedule for Irrigation
a) Contractor shall be responsible for notifying the C ity 24 hours (one working day) in advance for all inspections.
b) No work shall be backfilled until appropriate inspe ctions and tests have been completed 35 and approved by the City.
c) No irrigation inspection will commence without “As- Built” drawings. In the event the Contractor calls for an inspection without “As-Buil t” drawings, without completing previously noted corrections, or without preparing the system for inspection, no inspection will be made. Work will be redone at the Contractor ’s expense.
13. Clean-Up
a) Clean-up shall be made as each portion of work prog resses. Refuse and excess dirt shall be removed from the site, all paving shall be broom ed or washed down, and any damage sustained shall be repaired to original conditions.
E. LANDSCAPING MATERIALS
1. Plant Materials
a) Nomenclature - The scientific and common names of p lants specified shall conform with the approved names given in “Sunset New Western Gar den Book” published by Lane Publishing Co. (latest Edition).
b) Labeling - Each group of plant materials delivered to the site shall be clearly labeled as to species, variety, and nursery source.
c) Quality and Size
1) Plants shall be in accordance with the California S tate Department of Agriculture's regulation for nursery inspections, rules and grading.
2) All plants shall have a normal habit of growth and shall be sound, healthy, vigorous, and free of insect infestations, plant diseases, sun scalds, fresh abrasions of the bark, or other objectionable disfigurements.
3) Tree trunks shall be sturdy and well "hardened off" . All plants shall have normally well-developed branch systems and vigorous and fibr ous root systems which are not root or pot bound. In the event of disagreement as to condition of root system, the root condition of the plants furnished by the Contractor in containers will be determined by removal of earth from the roots of not less than tw o plants of each species or variety.
Where container grown plants are from several sourc es, the roots of not less than two plants of each species or variety from each source will be inspected. In case the sample plants inspected are found to be defective, all plants will have to be replaced. 4) The size of the plants will correspond with that no rmally expected for species and variety of commercially available nursery stock or as specified in the drawings. The minimum acceptable size of all plants, measured bef ore pruning with the branch in normal position, shall conform with the measurement s, if any, specified on the drawings in the list of plants to be furnished.
d) Rejection or Substitution - All plants not conformi ng to the requirements herein specified shall be considered defective and such plants, whet her in place or not, shall be marked as rejected and immediately removed from the site of work and replaced with new plants. The plants shall be of the species, variety, size, and condition specified on the drawings. e) Pruning - At no time shall the tree or plant materi als be pruned, trimmed, or topped prior to delivery. Main leaders shall not be cut or remov ed. f) Protection - All plants at all times shall be handl ed and stored so that they are adequately protected from drying out, wind burn, or any other injury. 36 2. Topsoil
a) Topsoil shall consist of a natural, fertile, friable, sandy loam soil. The topsoil shall be free from subsoil, refuse, heavy roots, clay lumps, stones larger than 1" in size, noxious weeds, sticks, brush, liner material, and other deleterious substances.
3. Soil Amendments
a) Soil amendments shall be a wood or bark product. Th e soil amendment shall not contain any bio-waste, noxious weeds, or weed seeds, pathog ens, herbicides, or other chemicals that could inhibit plant growth.
b) Soil amendments shall be nitrified to prevent soil nutrient problems.
4. Sod Pre-plant Fertilizers
a) Approved pre-plant fertilizers: Ammonium Phosphate Sulfate (16-20-0), Triple 16 (16- 16-16), Triple 15 (15-15-15).
b) Apply at the manufacturer’s and/or sod provider’s recommendation.
5. Tree/Shrub Pre-plant Fertilizers
a) Two-year time release fertilizer tablets.
b) Minimum tablet size is 20 grams.
c) Apply at the following rates: 1 per 1 gallon, 2 per 5 gallon, 5 per 15 gallon.
6. Tree Ties
a) Tree ties shall be installed per City standard details. The tree shall be fastened to the stakes with a No. 12 BWG galvanized iron wire covered with a new rubber garden hose in a manner which permits tree movement and supports the tree. Two (2) double ties shall be used near the top of the main tree trunk and near the middle of the main tree trunk.
7. Tree Stakes
a) Eight foot tree stakes shall be 2” diameter copper napthenate treated lodgepole pine stakes.
Ten foot tree stakes shall be 3” diameter copper na pthenate treated lodgepole pine stakes.
Stakes shall be 10' long for 24" & 36” box trees an d 8' long for 15 gallon trees, and shall be driven into soil a minimum of 24" depth and a mi nimum distance of 12" from the tree trunk.
8. Trunk Guards/Root Barriers
a) Trunk guards shall be installed at base of all trees planted in turf areas. b) Root barriers shall be provided where required by Section 8.50.090 of the Lancaster Municipal Code and herein section Trunk Guards/Root Barriers.
c) Root barriers shall be 36” deep and extend a minimum length of 10 linear feet, centered on the tree trunk, unless greater dimensions are required based on species or location. d) Root barriers shall be installed vertically and continuously adjacent and parallel to the improvement being protected. Panels shall be properly joined or overlapped in accordance with manufacturer requirements to prevent root passage between panels. e) Material shall be injection-molded high-density polyethylene or an approved equivalent. f) Minimum material thickness shall be 0.085 inch, consistent with Section 8.50.090 of the Lancaster Municipal Code.
g) Barriers shall incorporate integral vertical anti-lift/root-deflecting ribs. h) Root barriers shall not encircle the root ball.
37 i) Installation shall comply with the City's Standard Root Barrier Detail and manufacturer specifications.
j) The top of the root barrier shall be flush with finished grade. k) A minimum forty-eight (48) inch deep root barrier may be required by the Director for large- stature or aggressive-root tree species, trees located in constrained planting areas or tree wells, trees located in close proximity to underground utilities, or where site-specific soil, infrastructure, or planting conditions warrant additional protection. l) When it is required to install root barriers at existing trees, refer to Section I, Part B, D. Irrigation – Installation Procedures, Item 11 – Existing Trees.
9. Mulch
a) Mulch may be decorative bark, rock, or decomposed granite. All planters shall have added mulch and no bare ground. Mulch shall be at least 2 inches deep. The soil mulch shall not contain any bio-waste, noxious weeds or weed seeds, pathogens, herbicides, or other chemicals that could inhibit plant growth. Mulch shall be free of dirt and any other foreign material.
10. Sod
a) Sod shall be fully mature, well maintained, and a v ariety of either 100% Tall or Hybrid Fescue mixture, or Hybrid Bermuda. The sod shall be free of all other grasses or weeds, and shall be evenly cut with a conventional sod cutting machine. All material shall be from the same growing ground and delivered fresh to the job site.
F. LANDSCAPE - INSTALLATION PROCEDURES
1. Grading and Soil Preparation
a) All rough grading, mounding, and irrigation shall be completed prior to soil preparation. b) Rototill entire landscape area (planters and sod) t o a minimum depth of 6 inches to remove construction compaction.
c) Rototill in 3 cubic yards of soil amendment per 1,000 square feet of landscape area. d) Planting areas shall be free of all weeds (plants n ot specified in planting areas), stones, stumps, roots or other debris 1" in diameter or larger for a minimum of 6 inch depth. e) Soil shall be graded to a smooth and even surface c onforming to required finish grade.
Finish grade adjacent to walks, paved areas, curbs, manholes, clean outs, valve boxes, and similar features shall be 1" below the surface in t urf and 2" below the surface in ground cover/shrub areas. Grades between such features sha ll be carefully sustained and blended to eliminate abrupt changes.
f) Soil shall be graded to prevent water from running towards the home or patio and to prevent standing water near the home.
g) Planting areas to receive sod shall sustain a finis h grade of such depth that installed sod shall be flush with finish surfaces (walks, paved areas, etc.). h) All planting areas shall have a finish grade conforming to approved plans and specifications after full settlement has occurred.
2. Ground Cover
a) Ground cover plants shall be grown in flats. Flat grown plants (rooted cuttings) shall remain in those flats until transplanting. The soil of the flat shall contain sufficient moisture so that it will not fall apart when lifting the plants.
b) To avoid drying out, plantings shall be immediately sprinkled after planting until the entire area is soaked to the full depth of each hole. Evenly spread approved mulching material in the area planted with ground cover to a depth of 2".
38 3. Planting of Trees, Shrub and Vines
a) Excavation for Planting
1) Excavation for planting shall include the stripping and staking of all acceptable topsoil encountered within the areas to be excavated for tr enches, tree holes, plant pits, and planting beds.
2) All excavated holes shall have vertical sides with roughened surfaces. The holes shall be, in all cases, large enough to permit handling and roots or root balls. 3) Excess soil generated from the planting holes may b e distributed on the site and amended as specified in general soil preparation.
b) Planting
1) No more plants shall be distributed in the planting area on any day than can be planted and watered on that day.
2) Plants shall be removed in such a manner that the ball of earth surrounding the roots is not broken, and they shall be planted and watered as herein specified immediately after removal from the container.
3) Acceptable topsoil which was salvaged during the di gging of planting holes may be used for backfill.
4) After the plant has been placed, backfill shall be added to the hole to cover approximately one-half the height of the root ball. At this stage, water shall be added to the top of the partly filled hole to thoroughly saturate the root ball and adjacent soil. 5) Use Best 20-10-5 two-year time release fertilizer t ablets, or equal, at the following rates: 1 per 1 gallon, 2 per 5 gallon, 3 per 15 gallon. 6) After the water has completely drained, the remaind er of the hole shall then be backfilled.
7) After backfilling, a temporary earthen basin shall be constructed around each plant.
Each basin shall be a depth sufficient to hold at l east 6" of water. Basins shall be extended 6 inches from the edge of the root ball of each individual plant. 8) Immediately after planting apply water to each tree and shrub. 9) Plant basins shall be irrigated at least twice over two days prior to removing the berm and applying mulch.
4. Turf
a) After preparation of soil in accordance with the section "Grading and Soil Preparation'', the areas to be planted to lawn shall be rolled, raked, and floated to finish grade by any acceptable method with the finish grade being smoot h and even, free of rocks and clods, and reasonably well firmed. Prior to planting, the surface of the area shall be sufficiently loose and viable to receive sod.
1) Pre-fertilization – Just prior to the planting of t urf, evenly broadcast appropriate fertilizer as specified by manufacturer’s recommendation. 2) Sod - Lay sod in one direction only, with close fitting butt joints. The ends of each strip shall be staggered to eliminate continuous joining.
5. Root Barrier Inspection
a) All required root barriers shall be installed and remain exposed and accessible for inspection prior to backfilling or planting. The Contractor shall notify the City a minimum of twenty-four (24) hours prior to the requested inspection. No root barrier shall be backfilled, covered, or otherwise concealed until installation has been inspected and approved by the City. Installation shall be verified for required depth, length, location, material, orientation, and continuity. 39 6. Compliance With The Certificate Of Completion
a) The project applicant shall:
1) Prior to backfilling, have a licensed landscape arc hitect, certified irrigation auditor, or licensed landscape contractor conduct a preliminary field observation of the irrigation system;
2) Upon project installation, have a licensed landscap e architect or licensed landscape contractor conduct a final field observation for the approval of the certificate; 3) Upon project installation, have a certified irrigat ion auditor conduct a landscape irrigation audit as required under Title 8, Chapter 50 of the Lancaster Municipal Code (Lancaster Water Efficient Landscape Ordinance) and described in these design standards.
4) Submit the signed Certificate of Completion to the City for approval; 5) Receive the Certificate of Occupancy or equivalent from the City; and 6) Submit copies of the approved Certificate of Comple tion to the local retail water purveyor and the property owner or his/her designee.
SECTION II: SPECIAL REQUIREMENTS FOR RESIDENTIAL LA NDSCAPE AND
IRRIGATION
A. Turf is prohibited in commercial and industrial development proposals except where approved as a recreational area.
B. Turf is not to exceed 25% of the landscape areas in residential development proposals, nor exceed maximum allowable turf areas described in the table below.
C. Pool and spa covers are required.
Maximum Allowable Turf Areas for Residential Development Table A
Type of Residential
Development
R-7000 SFR lots or
smaller
R-10,000 SFR lots ½ Acre lot or larger
Maximum Turf
(sq. footage)
1,500 2,000 2,700
.
SECTION III: SPECIAL REQUIREMENTS FOR COMMERCIAL, I NSTITUTIONAL, AND
INDUSTRIAL LANDSCAPE AND IRRIGATION
A. Turf is prohibited in commercial, institutional, and industrial development proposals except where approved as a recreational area.
SECTION IV: SPECIAL REQUIREMENTS FOR LANDSCAPE MAIN TENANCE
DISTRICTS AND PUBLIC RIGHTS-OF-WAY LANDSCAPE AND IRRIGATION
A. Organic mulch is required to be three-inch minim um depth.
APPENDIX A
Appendix A – Reference ETo
Reference Evapotranspiration (ETo) Table for the Ci ty of Lancaster, Los Angeles County, California
(inches of water)
Jan Feb Mar
Apr May Jun July Aug Sep Oct Nov Dec Annual
ETo
2. 4 2.9 4. 4 5. 8 7.3 8.5 9.3 8.6 6.6 4.6 2. 9 2.1 65 .3
The ETo values are monthly averages of Spatial Cali fornia Irrigation Management Information System (CIMIS) for the 2004 to 2021 period.
APPENDIX B
Appendix B – Water Efficient Landscape Worksheet
Please complete the entire worksheet. This workshee t is part of the Landscape Documentation Package
SECTION A. PROJECT INFORMATION
Date:
Project Name
Project Applicant
Project Address and Location
Street Address Parcel Number
City Tract or Lot Number(s)
State Zip Code Latitude/Longitude Coordinates (opti onal) Please use the checklist below to indicate completion of the Landscape Documentation Package.
Landscape Documentation Package
Water Efficient Landscape Worksheet
Soil Management Plan (Soil Analysis Report and On-s ite soil Assessment with Recommendations)
Landscape Design Plan
Irrigation Design Plan
Grading Design Plan
Please fill in the information below to describe the landscape project, where applicable:
Total Project area (sq. feet)
Total irrigated landscape area * (sq. feet)
Turf area (sq. feet)
Non-turf area (sq. feet)
Recreational areas (sq. feet)
Areas permanently and solely dedicated to edible plants (sq. feet) *Additional information is also required in Part # 3 of the worksheet
Total non-irrigated landscape area (sq. feet)
Water supply type. Please check all that apply.
Potable water Mixed Use
Recycled Water Rainwater
Graywater Other
Groundwater or Well Water
Project Type. Please check only one
Public or community facility (i.e.,
park, playground, etc.)
Single Family Residence
Commercial Multi -Family Residential
Industrial Model Home
Institutional (i.e., school, etc.) Mixed Use
Other
Project Contacts
The project applicant and other individuals may receive inquiries or notifications of all proceedings regarding the Water Efficient Landscape Worksheet f rom the local agency. Please provide the name, address, and telephone, etc. of each person to receive such inquiries and notifications.
1. Project Applicant
Name Telephone #
Fax #
Title Email address
License #
Company Street Address
City State Zip
2. Property Owner
Name Telephone #
Fax #
Title Email address
License #
Company Street Address
City State Zip
3. Licensed Landscape Architect
Name Telephone #
Fax #
Title Email address
License #
Company Street Address
City State Zip
4. Certified Irrigation Designer
Name Telephone #
Fax #
Title Email address
License #
Company Street Address
City State Zip
5. Landscape Installation Contractor
Name Telephone #
Fax #
Title Email address
License #
Company Street Address
City State Zip
6. Landscape Maintenance Contractor (if known)
Name Telephone #
Fax #
Title Email address
License #
Company Street Address
City State Zip
7. Local retail water purveyor
Name of contact at water purveyor Telephone No.
Fax No.
Title Email address
Name of Company or Water Purveyor Street Address
City State Zip Code
SECTION B. WATER USE EFFICIENCY STATEMENT
Provide a narrative summary of the water use effici ency practices applied to the landscape project and answer all of the following questions (attach additional sheets if necessary):
Narrative
Statement
Questions:
1) Did you review the ordinance to learn about the criteria and specifications for landscape design plans? Yes No
2) Did you coordinate with the local agency or local retail water purveyor on the landscape design plan?
3) Which criteria and specifications did you apply to the landscape design plan?
4) Did you review the ordinance to learn about the cri teria and specifications for the irrigation design plans?
5) Did you coordinate with the local agency or local retail water purveyor on the irrigation design plan?
6) Which criteria and specifications plan did you appl y to your irrigation design plan?
7) Did you ask for assistance from the local agency/local retail water purveyor to calculate a project water budget?
8) Did you receive any water efficient landscape publications from the local agency or local retail water purveyor?
9) How will you assure the overall quality of the irri gation system?
10) How will you manage the irrigation system for optim um operation and performance?
11) How will you manage the irrigation system to respond to the changing requirement for water in the landscape?
12) Did you apply any stormwater best management practices to the design?
13) If recycled water was available, did you design and install a duel distribution system?
14) Did you select plants from the City approved plant list?
SECTION C. Water Budget Calculation
S
ection C1. Maximum Applied Water Allowance
The Project’s Maximum Applied Water Allowance shall be calculated using this equation:
MAWA = (ETo) (0.55) (LA) (0.62)
MAWA
ETo
=
=
Maximum Applied Water Allowance (gallons per year)
Reference Evapotranspiration (inches per year)
0.55 = ET Adjustment Factor (0.45 for nonresidential landscape areas) LA = Landscaped Area (square feet)
0.62 = Conversion factor (to gallons)
M
aximum Applied Water Allowance = gallons
Show calculations
If the irrigation water (recycled water or blended water) has electrical conductivity equal to, or greater than, 3 deci Siemens per meter (dS/m) or 3 millimhos per centimeter (mmh/cm) or 2000 mg per liter total dissolved solids (TDS), a leaching factor of up to 10% may be included in the MAWA calculation. The leaching factor shall not exceed 10% of MAWA.
Section C2. Estimated amount of water expected from effective precipitation has been eliminated because the City of Lancaster does not receive enough reliable rainfall in any given year to utilize this information.
Section C3. Estimated Water Use for hydrozones and Estimated Total Water Use The project’s Estimated Total Water Use is calculated using the following formula:
EWU = (ETo) (PF) (HA) (0.62)
(IE)
EWU = Estimated total water use for a hydrozone (gallons) ETo = Reference evapotranspiration (inches per month)
PF = Plant Factor
HA = Hydrozone area (square feet)
0.62 = Conversion factor
IE = Irrigation efficiency
Show calculations for each hydrozone (attach additional sheets if necessary).
ETWU = I=1 to n (EWUi)
i = hydrozone number
n = total number of hydrozones
Estimated Total Water Use =
Show calculations:
Section C4. Estimated Applied Water Use section has been eliminated because the City of Lancaster does not utilize effective rainfall in these calculations
Section C5. Additional Water Requirements
Recreational areas and areas permanently and solely dedicated to edible plants may require water in addition to the Maximum Applied Water Allowance. Please be sure to provide a statement in the landscape design plan and in the irrigation sch edule, designating those portions of the landscape to be used for such purposes and specifyi ng any additional water needed above the Maximum Applied Water Allowance. The total amount of irrigation water allowed for these areas shall not exceed 1.0 of ETo.
Show calculations:
SECTION D. HYDROZONE INFORMATION
Section D1. Hydrozone Map
Attach a hydrozone map to the Water Efficient Lands cape Worksheet. Hydrozones shall be designated by number, letter, or other designation. Designate the areas irrigated by each valve, and assign a number to each valve. Use this valve number in Section D2 – Hydrozone Table. This map can also assist with pre and final inspections of the irrigation system, and programming the controller.
Section D2. Hydrozone Table (Blank Form)
Please complete the hydrozone table(s) for each irr igation point of connection. Use as many worksheets as necessary to provide square footage o f landscape area per valve. Blank forms are provided on the next page.
Irrigation Point of Connection (P.O.C.) #
Controller
#
Valve
Circuit #
Plant Type
(s)*
Irrigation
Method
Area
(Sq. Ft.)
% of
Landscape
area
* Plant Type **Irrigation Method
CST = Cool Season Turf MS = Microspray
WST = Warm Season Turf S = Spray
HW = High Water Use Plants R = Rotor
MW = Moderate Water Use Plants B = Bubbler
LW = Low Water Use Plants D = Drip
Section D3. Hydrozone Calculations Summary (Blank F orm) Please complete a hydrozone calculation summary for each irrigation point of connection.
Irrigation Point of Connection #
Hydrozone Total Square
Feet
% of Total Landscape
Area
Cool Season Turf
Warm Season Turf
High Water Use Plants
Moderate Water Use Plants
Low Water Use Plans
High and Medium Water Mix
Medium and Low Water Mix
Total
Comments
The hydrozone table and hydrozone calculation summary are provided below as examples only.
Irrigation Point of Connection (P.O.C.) #1 Main Street
Controller
#
Valve
Circuit
#
Plant Type Irrigation
Method
Area
(sq.ft.)
% of
Landscape
Area
1 1 HW/MW Bubbler 275 2.8%
1 2 HW Bubbler 275 2.8%
1 3 LW Drip 1,040 10.5%
1 4 CST Spray 496 5.0%
1 5 LW Drip 600 6.1%
1 6 CST Spray 1,600 16.2%
1 7 LW Drip 724 7.3%
1 8 MW/LW Drip 1,852 18.8%
2 1 CST Spray 1,600 16.2%
2 2 HW Bubbler 80 0.8%
2 3 LW Drip 780 7.9%
2 4 LW Drip 548 5.6%
Irrigation Point of Connection # (P.O.C.) #1 (Main Street) Hydrozone Total Square
Feet
% of Total Landscape
Area
Cool Season Turf 2,467 25 .0
Warm Season Turf 0 0
High Water Use Plants 355 3.6
Moderate Water Use Plants 0 0
Low Water Use Plants 3,692 37.6
High and Medium Water Mix 275 2.3
Medium and Low Water Mix 3,081 30 .7
Total 9,870 100%
SIGNATURES
I further acknowledge and agree under penalty of perjury under the laws of the State of California that the information contained in the Water Efficient Landscape Worksheet is true and correct.
Signature of Project Applicant Date
THIS SECTION BELOW IS FOR LOCAL AGENCY USE ONLY.
Signature of the Local Agency Representative
Name of the Local Agency Representative
Title
Telephone Number
Email Address
Name of Local Agency
Name of Department/Division/Unit
Street Address
City
State and Zip Code
For this project the Permit, Plan Check, or Design Review has been:
Issued
Date:
Notes:
Denied:
Date:
Notes:
Comments :
APPENDIX C
Appendix C – Sample Certificate of Completion
CERTIFICATE OF COMPLETION
This certificate is completed by the project applic ant upon installation at the final field observation of a landscape project.
Please complete all sections below
SECTION A. PROJECT INFORMATION
Date
Project Name:
Project Applicant
Project Address and Location
Street Address Parcel Number
City Tract or Lot Number
State Zip Code Latitude/Longitude (optional)
Please answer the questions below:
1) Did you submit a Landscape Documentation Package to your local agency?
Yes No
2) Was your Landscape Documentation Package approved by the local agency?
Yes No
3) When were you issued a permit or approval for the plan check or design review? Date:
4) Did you submit the Water Efficient Landscape Worksh eet (including the Water Budget Calculations) to your local retail water purveyor?
Yes, Date: No
SECTION B. FINAL INSPECTION
Please use this checklist to verify the following has been completed:
□ The preliminary field observation of the irrigation system or plumbing, prior to backfilling, is completed. Date of preliminary field observation:
□ Date of final field observation by project applicant:
□ All required root barriers were inspected and approved by the City prior to backfilling. □ The plant materials are installed as specified.
□ The Irrigation system is designed as specified.
□ If applicable, the dual distribution system for recycled water is installed as specified. □ There is minimal run off or overspray from the irrigation system. □ The irrigation schedule is submitted for the plant establishment period. □ The project submittal package including any as buil t modifications to the landscape design or irrigation system design and a copy of this Certifi cate of Completion has been provided to the property owner or his/her designee.
Fill in any additional criteria or specifications from the ordinance. □
□
□
□
□
Comments:
SECTION C. IRRIGATION (WATERING) SCHEDULE
Attach the irrigation schedule.
SECTION D. LANDSCAPE IRRIGATION AUDIT REPORT
Attach the Landscape Irrigation Audit Report.
SECTION E. SCHEDULE OF LANDSCAPE IRRIGATION AUDITS
Attach the schedule of Landscape Irrigation Audits.
SECTION F. SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE Attach the schedule of Landscape and Irrigation Maintenance.
SECTION G. SIGNATURES
Attach signatures.
CONTRACTOR
“I/we certify that work has been installed in accordance with the contract documents.”
Signature of Contractor Date
Name of Contractor –(print) Telephone No.
Fax No.
Title Email address
License No.
Company Name Street Address
City State Zip Code
LANDSCAPE ARCHITECT, CERTIFIED IRRIGATION DESIGNER, OR LICENSED
LANDSCAPE CONTRACTOR
“I/we certify that based upon periodic site observations, the work has been substantially completed in accordance with the ordinance and that the lands cape planting and irrigation installation conform with the criteria and specifications of the approved Landscape Documentation Package.”
Signature of Landscape Architect/Certified
Irrigation Designer/ Landscape Contractor
Date
Name of Landscape Architect/Certified
Irrigation Designer/ Landscape Contractor
(print)
Telephone No.
Fax No.
Title Email address
License No. or Certification No.
Company Name Street Address
City State Zip Code
PROPERTY OWNER
“I/we that I/we have received all of the contract documents and that it is our responsibility to see that the project is maintained in accordance with t he contract documents and to comply with the provisions of the ordinance pertaining to landscape irrigation audits.”
Signature of Property Owner or his/her
Designee
Date
Property Owner or his/her designee (print) Telephon e No.
Fax No.
Title Email address
Company Name Street Address
City State Zip Code
THIS SECTION BELOW IS FOR LOCAL AGENCY USE ONLY.
Signature of the Local Agency
Representative
Name of the Local Agency Representative
Phone # Email address Title
Name of local agency Name of Department, Division, or Unit Street Address City
State Zip Code
For this project , the Certificate of
Completion has been
Approved
Date:
Notes:
Denied
Date:
Notes:
For this project , the Certificate of
Occupancy or Equivalent has been:
Issued
Date:
Notes:
Denied
Date:
Notes:
APPENDIX D
Appendix D – Effective Precipitation Disclosure Statement This portion of the formula has been eliminated, as the City does not receive enough annual precipitation to utilize in this formula.
APPENDIX E
Appendix E – Conversion Factors and Calculations
A. Conversion Factors
To convert from To Multiply By
inches of water Gallon Landscape area (sq.ft.) x
0.62 cubic feet Gallons 7.48
ccf Gallons 748
acre feet Gallons 325,851
acre feet Cubic feet 43.560
gallons Pounds 8.34
cubic feet per second (cfs) Gallons per minute (gpm) 448.83 hectare Acres 2.47
acres Square feet 43,560
B. Calculations
ET Adjustment Factor
ETAF = (PF)/(IE)
Where:
ETAF = Evapotranspiration adjustment factor
PF = Plant factor
IE = Irrigation efficiency
= (Distribution Uniformity) X (Management Efficiency)
Landscape Coefficient (refer to Water Use Classification of Landscape Species or WUCOLS for details)
K
L = (K s) (K d ) (K mc )
KL = landscape coefficient or plant factor.
Ks = species factor
Kd = density factor
Kmc = microclimate factor
Maximum Applied Water Allowance
MAWA = (ETo) (0.55) (LA) (0.62)
MAWA= Maximum Applied Water Allowance (gallons per year) ETo = Reference Evapotranspiration (inches per year )
0.55 = ET Adjustment Factor (0.45 for nonresidentia l landscape areas) LA = Landscaped Area (square feet)
0.62 = Conversation factor
Estimated Water Use (for a Hydrozone)
EWU = (ETo) (PF) (HA) (0.62)
(IE)
EWU = Estimated total water use for a hydrozone (gallons) ETo = Reference evapotranspiration (inches per month)
PF = Plant factor (or landscape coefficient)
HA = Hydrozone area (square feet)
0.62 = Conversion Factor
IE = Irrigation Efficiency (fraction)
APPENDIX F
10 0 Pedestal Mounted Electrical Service
102 Automatic Controller (W/Enclosure)
103-1 Booster Pump (Elevation)
103-2 Booster Pump (Plan View)
104 Wire Connector
105 Trenching
107 Electric Pull Box
108 Backflow Preventer (2in.and smaller)
109 Backflow Preventer (2-1/2” and larger)
110A Ball Valve (2in.and smaller)
110B Gate Valve (2-1/2” and larger)
111 Pressure Relief Valve
112 Pressure Reducing Valve
113 Electric Control Valve
114 Quick Coupling Valve
115 Swing Check Valve
118A Shrub Spray
118B Shrub Bubbler Assembly
118C Shrub Bubbler on Flex Riser
120 Rotor Pop-up Sprinkler
123A 12in Pop-up Spray Sprinkler
123B 6in Pop-up Spray Sprinkler
126 Tree Bubbler
201 AC Path
202 Equestrian Trail
203A-1 Concrete Mow Strip
204 Concrete Equestrian Fence
205 Shrub Planting
206 Shrub Planting (Slope)
207 Tree Planting
208 Tree Planting (Slope)
209 Tree Planting (Tree Well)
210A Root Barrier
210B Root Barrier (Plan View)
211 Groundcover Spacing
212A Tree Placement Controlled
212B Tree Placement Uncontrolled Intersection
213 Street Tree Placement
214 Swing Check Valve
215 Irrigation Typical Symbols
CITY OF LANCASTER100PEDESTAL MOUNTEDELECTRICAL SERVICESTANDARDDETAIL
GROUND ROD W/GROUND CLAMP
LOAD CONDUIT
3/8"Øx18" GALV. ANCHOR BOLTSTHREAD 4" W/ 1 NUT & 1 WASHEREACH. LENGTH DOES NOT INCLUDE4" 30° BEND 0-135" SHEET METAL
FINISHED GRADE
SERVICE CONDUIT
PEDESTAL TO BEINSTALLED ADJACENTTO TRACT WALL
METER SOCKET SHALLMEET REQUIREMENTSOF SERVING UTILITYCIRCUIT BREAKER ENCLOSUREHASP FOR PADLOCKINSTALL METAL SHIELD UNDERDOOR TO PREVENT REACHINGINTO BREAKER ENCLOSER 60" MIN.
2"24" 6"
102CITY OF LANCASTER
AUTOMATIC CONTROLLER ENCLOSURE WITH HINGEDDOOR - STAINLESS STEEL CABINET AND DOOR.ENCLOSURE TO BE LE MEUR OR APPROVED EQUAL. 1" CONDUIT SHALL BE FROM INSIDE THEIRRIGATION CONTROL PANEL TO EACHEND OF THE PROPERTY. A 1/4"POLYPROPYLENE PULL CORD SHALL BELEFT INSIDE THE CONDUIT. 117 VOLT, 60 CYCLE POWER WIRESIN METALLIC CONDUIT AS PER CODE3" PVC LONG SWEEP ELL
FINISH GRADESLOPE TO DRAIN
ON/OFF SWITCH FORCONTROLLER POWER ANDELECTRICAL OUTLET WITHGFI AND CONDUIT TOCONTROL AUTOMATIC CONTROLLERMOUNTED TO ENCLOSUREWALL BRACKETSPOURED CONCRETE BASE-6" MIN. THICKNESS ANDAS REQUIRED BYMANUFACTURER'SINSTALLATION GUIDEMAINTAIN 1/2" AIRSPACE BETWEEN BOXAND CONCRETE
DIRECT BURIAL COPPERCONTROL WIRE TOCONTROL VALVES
AUTOMATICCONTROLLER(W/ ENCLOSURE)STANDARDDETAIL
CITY OF LANCASTER
6"
NOTE:ELEVATION
HIGH VOLTAGEELECTRIC TOPUMP PANEL
BOOSTERPUMP
FINISHEDGRADE4" THICK CONC. PADSLOPE TO DRAIN
CLEARANCEALL SIDES
90°ELBOW (TYP.)SWING CHECK VALVEPUMP ENCLOSUREUNION
DISCHARGE CENTER4" CLEAR
FROM BACKFLOW PREVENTORPVC MALE ADAPTERTO SPRINKLER SYSTEM ·ALL FITTINGS SHALL BE BRASS.·INSTALL W/ LE MEUR ENCLOSUREOR APPROVED EQUAL.
BOOSTER PUMP(ELEVATION)STANDARDDETAIL103-1
TEE
DRAIN THROUGH CONCRETE2X DIAMETER OF INLET PIPE.GRAVEL UNDERNEATH.
CITY OF LANCASTER103-2BOOSTER PUMP(PLAN VIEW)STANDARDDETAIL ·ALL FITTINGS SHALL BE BRASS.·INSTALL W/ LE MEURENCLOSURE OR APPROVEDEQUAL.
CONC. BASE PAD6" CLEAR ALL SIDES
BOOSTER PUMPPUMP SHELTERVICTAULIC COUPLING(TYP.)VICTAULIC NIPPLE-4" LONG (TYPICAL4 PLACES)
ECCENTRIC REDUCERGRINNELL PIPE SUPPORTUNIONGATE VALVE
TO SPRINKLERS90° ELB(TYP.)UNION
FROM BACKFLOWPREVENTORGATE VALVEGRINNELL PIPESUPPORTECCENTRICREDUCER PLAN VIEWNOTES:
CITY OF LANCASTER104
STEP 1
STEP 2
STEP 3
STEP 4STANDARDDETAILWIRECONNECTOR
POSITION WIRE CHANNELS AND SNAPINSULATOR TUBE COVER CLOSED.
INSERT THE SPLICE INTO THE GEL-FILLED INSULATORTUBE. PUSH PAST THE LOCKING FINGERS TO HOLDTHE TWIST CONNECTOR IN PLACE.
TWIST CONNECTOR UNTIL WIRE END REACHES BOTTOM
STRIP WIRES APPROX. 5/8" FROM END
CITY OF LANCASTER105STANDARDDETAILTRENCHING
·PROVIDE 2" OF CLEAN BACKFILL UNDERALL PIPING·NO OTHER TRADES (ELECT., LIGHTING)ALLOWED TO USE SAME TRENCH ASIRRIGATION PIPE.·PROVIDE 24" COVER FOR DIRECT BURIALCABLE·PROVIDE P.V.C. SCH.40 SLEEVES FOR ALLWIRING & PIPING UNDER PAVING·NO STAKING (VERTICALLY) OF PIPES INSAME TRENCH NOTES:
PRESSURE MAINLINE PIPINGCONTROL WIRESCONTROL WIRES
NON-PRESSURE LATERALLINE PIPINGFINISH GRADE
SEE IRRIGATION SPECIFICATIONSFOR BACKFILL AND COMPACTIONREQUIREMENTS 12" MIN. 18" MIN.6"6"
CITY OF LANCASTER107
PLAN VIEW18"+ 12"+
ELEVATION
18"+12"18"
12"+
STANDARDDETAILELECTRIC PULLBOX
·INSTALL PULL BOXES AS SHOWN ON PLANS.·AT JUNCTIONS WHERE RUNS COMBINE, SPLICE COMMON GROUND IN PULLBOX.·PULLBOX COVER SHALL BE PERMANETLY MARKED "ELECTRIC".·CONDUCTORS FOR EACH CONTROLLER CLOCK SHALL BE HARNESSEDSEPARATELY AND AT SUFFICIENT INTERVALS TO MAINTAIN A DEFINITE BUNDLE.·ALL SPLICES AND SPARE WIRE ENDS SHALL BE MADE WITH A PROPERLY SETMECHANICAL SPLICE CONNECTOR ENTIRELY ENCLOSED IN SELF-CURING EPOXYRESIN AND SHALL BE COMPLETELY WATER-PROOF.
BEDDING MATERIALCONTROL WIRE RUN
UNMORTARED BRICKFOUNDATION
LOOP CONTROL WIRES INTO THEPULLBOX. ALL SPLICES ARE TO BEMADE IN PULL BOXES OF REMOTECONTROL VALVE BOXES.
LOCKABLE TOPSIZE 9 1/2"x16"FINISHED GRADE
CONTROL WIRERUN
NOTES:
3"
2"
CITY OF LANCASTER108
NOTES:
18"MIN.
BACKFLOWPREVENTER2" AND SMALLERSTANDARDDETAIL
1/2" CLEARANCEBETWEEN BOX &CONCRETE ALLAROUND
BACKFLOW PREVENTER SHALL BE REDUCED PRESSUREINSTALLED IN LEMUER ENCLOSURE (SOLID PANEL) ORAPPROVED EQUAL. POWDERCOAT COLOR TO BE TAN.BRASS WYE STRAINERBACKFLOW PREVENTERBALL VALVE (TYP.)BRASS 90°ELBOW (TYP) BRASS NIPPLE (TYP.)BRASS UNION (TYP)6" CONCRETE PAD
BRASS COUPLINGBRASS NIPPLE (TYP.)DRAIN THROUGH CONCRETE 2XDIAMETER OF INLET PIPE. AS PERL.A. COUNTY CODE. GRAVELUNDERNEATH.SLEEVE AROUND NIPPLESTHROUGH CONCRETE 2 LINESIZES LARGER THAN PIPEFROM POINT OF CONNECTIONADAPT AS REQUIREDPVC MALE ADAPTERPVC PIPE TO SPRINKLERS·INSTALL PER LOCAL CODE.·ALL BACKFLOW PREVENTERS SHALL BEWINTERIZED / WRAPPED P-10 PROTECTION (TYP.)ALL VALVES SHALL BE "BALL TYPE" (TYP.)·USE FIBERGLASS INSULATION TAPE·CELOTEX OR EQUAL 1" INSULATION ATTACHEDTO INSIDE WALL & CEILING WITH ADHESIVE BRASS NIPPLE-4"MIN. LENGTH (TYP.)
CITY OF LANCASTER109
NOTES:12"
THRUSTBLOCKBLOCKTHRUST
BACKFLOWPREVENTER2-1/2" AND LARGERSTANDARDDETAIL
BACKFLOW PREVENTER SHALL BEINSTALLED IN LEMEUR ENCLOSURE(SOLID PANEL) OR APPROVED EQUAL.POWDERCOAT COLOR TO BE TAN.BACKFLOW PREVENTERFLANGED90° ELL"Y" STRAINER
PIPE SUPPORT
ADAPT INLET AND OUTLET FITTINGS TOMAIN LINE AS REQUIRED·INSTALL PER LOCAL CODE·ALL BACKFLOW PREVENTERS SHALL BEWINTERIZED/WRAPPED R-10 PROTECTION (TYP.)ALL VALVES SHALL BE 'BALL TYPE' 2" & SMALLERRESILIENT SEAT OR WEDGE FOR 2-1/2" & LARGER.·FITTING OR "T" REDUCED TO 1/2" THREADED FORPRESSURE CHECK (TYP.)·THRUST BLOCKS AS REQUIRED IN SECTION II.C.6 6" THICKCONCRETEPADDRAIN THROUGH CONCRETE 2XDIAMETER OF INLET PIPE. AS PERL.A. COUNTY CODE. GRAVELUNDERNEATH.
CITY OF LANCASTER110A
6"
BALL VALVE2" AND SMALLERSTANDARDDETAIL
EXTENSION-LENGTHAS REQUIRED
VALVE "BALL TYPE" (TYP.)
FINISHED GRADE
PVC MALE ADAPTER
3/4" WASHED ROCK
10" ROUND VALVE BOXWITH LOCKING LID
2"x4" BRICK(2 TYP.)
1" IN LAWN AREAS2" IN SHRUB AREAS
NOTE:·VALVE BOX AND LIDTO BE TAN COLOR.
CITY OF LANCASTER110B
1"
6"
GATE VALVE2-1/2" AND LARGERSTANDARDDETAIL
3/4" WASHED ROCK
EXTENSION-LENGTHAS REQUIRED
GATE VALVE
FINISHED GRADE10" ROUND VALVE BOXWITH LOCKING LID1" IN TURF AREAS3" IN MULCH AREAS
PVC MALE ADAPTER
2"x4" BRICK(2 TYP.)
NOTE:·VALVE BOX AND LIDTO BE TAN COLOR.
CITY OF LANCASTER111STANDARDDETAILPRESSURERELIEF VALVE
MAIN LINE FITTINGPVC 90° ELL TxT1 CU. FT. 3/4" Ø ROCK2"X4" BRICK(2 TYP.)
FINISH GRADE
PVC STREET ELL
10" ROUND VALVE BOXWITH LOCKING LID
PRESSURE RELIEF VALVE(SELF-CLOSING TYPE)
PVC SCH. 80 NIPPLES
NOTE:·VALVE BOX AND LIDTO BE TAN COLOR.
CITY OF LANCASTER112
34 1"
STANDARDDETAILPRESSUREREDUCING VALVE
6"
" WASHED ROCK
EXTENSION-LENGTHAS REQUIREDPRESSURE REDUCING VALVE
FINISH GRADE10" ROUND VALVE BOXWITH LOCKING LID
PVC MALE ADAPTER
2"X4" BRICK(2 TYP.)
NOTE:·VALVE BOX AND LIDTO BE TAN COLOR.
CITY OF LANCASTER113
NOTES:
ELECTRICCONTROL VALVESTANDARDDETAIL
·ALL SPLICES ABOVE GRADE IN BOX.LOOP COMMON ABOVE VALVE.·ADD A BALL VALVE SHUT OFF BEFOREEACH VALVE IN VALVE BOX.·VALVE BOX AND LID TO BE TAN COLOR. 6"
SCH 80 PVC MAIN LINE FITTING, SxSxT
COMMON WIRE TO OTHER VALVESON SAME CONTROLLER.
PVC SCH. 80NIPPLEPVC TxT 90° ELBOW
3/4" CRUSHED ROCK
2"x4" BRICK (4 TYP.)
BALL VALVEPVC SCH. 80 NIPPLEELECTRIC CONTROL VALVE
1" IN LAWN AREAS2" IN SHRUB AREASRECTANGULAR VALVE BOXWITH LOCKING LID TO SPRINKLERS-ANGLE PIPE TOSPECIFIEDDEPTH WITH 45°ELBOWS.
FINISH GRADEWIRE CONNECTORSEXPANSION CURLS ANDI.D. TAG (CHRISTY, OREQUIVALENT) 6"
CONTROL WIRES TO CONTROLLER
CITY OF LANCASTER114
10" ROUND PLASTIC BOXWITH LOCKING LID, Q.C.V.2" BELOW BOTTOM OF LID.
SCH. 40 PVC 90°STREET ELBOW
MAIN LINE FITTING -SxSxT
SCH. 80 PVC NIPPLE - 6" LENGTH90° STREET ELBOW SCH. 40 PVC
WALK OR CURB
NIPPLE SCH. 80 PVC90° ELBOW SCH. 40 PVC
MAIN LINE PIPING
·NO MARLEX FITTINGS ON PRESSURE LINES·USE TEFLON TAPE ON ALL THREADEDFITTINGS TYPICAL.·VALVE BOX AND LID TO BE TAN COLOR. 6"
STANDARDDETAILQUICK COUPLINGVALVE
#4 x 36" REBAR STAKE,STAINLESS STEELCLAMP
FINISH GRADE- 1" IN LAWN AREA- 2" IN SHRUB AREA
2"
2"X4" BRICK (2 TYP.)3/4" ROCK, 2 CUBIC FT. OVERLANDSCAPE FABRIC, WRAP UPAND OVER BOX HOLES2 PIECE QUICKCOUPLING VALVE NOTES:
CITY OF LANCASTER
34 115SWING CHECKVALVESTANDARDDETAIL
10" ROUND VALVE BOX WITHLOCKING LIDFINISH GRADE
PVC MALE ADAPTER
2"X4" BRICK(2 TYP,)" WASHED ROCK
6"
1" SWING CHECK VALVE
·USE TEFLON TAPE ON ALL PVC THREADEDFITTINGS TYPICAL.·VALVE BOX AND LID TO BE TAN COLOR.NOTES:
NOTE:
CITY OF LANCASTER118ASTANDARDDETAILSHRUB SPRAYASSEMBLY
·STANDARD SWING JOINT ASSEMBLY SHOWN, PRE-ASSEMBLEDSWING JOINT ASSEMBLY MAY BE SUBSTITUTED. SPIRAL BARBFITTINGS WILL NOT BE ACCEPTED. 4"36"
SHRUB
PVC LATERAL PIPEPVC SCH 40 TEE OR ELL
PVC SCH 40 STREET ELL1/2-INCH PVC SCH 80 NIPPLE(LENGTH AS REQUIRED)PVC SCH 40 STREET ELLPVC SCH 40 ELL10" FLEXIBLE RISERFINISH GRADE/TOP OF MULCH1/2" x 36" GALV. STEEL STAKEADAPTER WITH FLOW CONTROLRAINBIRD 8Q LOW ANGLE SPRINKLERWITH SILVER RAINBIRD 1800 PCS(0.30 G.P.M. 1.14 L.P.M.) CITY OF LANCASTER118BSHRUB BUBBLERASSEMBLYSTANDARDDETAIL ·STANDARD SWING JOINT ASSEMBLY SHOWN, PRE-ASSEMBLEDSWING JOINT ASSEMBLY MAY BE SUBSTITUTED. SPIRAL BARBFITTINGS WILL NOT BE ACCEPTED.NOTES:
MAX 6" FROM EDGE OFROOT BALLPRESSURE COMPENSATINGFULL CIRCLE BUBBLER:RAIN BIRD 1401PLANT MATERIALFINISH GRADE/TOP OF MULCHUV RADIATION RESISTANT1/2 INCH PVC SCH 80 NIPPLE(LENGTH AS REQUIRED)HIGH DENSITY POLYETHYLENE STREETELL. INSTALL SO ELL TIGHTENS WITHDOWNWARD THRUST.
HIGH DENSITY POLYETHYLENESTREET ELL. INSTALL SO ELLTIGHTENS WITH DOWNWARD THRUST.PVC SCH 40 TEE OR ELLPVC LATERAL PIPE 2" MAX
PVC SCH 80 6" NIPPLE
CITY OF LANCASTER118CSTANDARDDETAILSHRUB BUBBLERON FLEX RISER
PLANT ROOTBALL
PLANT
PVC LATERAL PIPE
PRESSURE COMPENSATINGFULL CIRCLE BUBBLER:RAIN BIRD 1401 - 0.25 GPM*MINIMUM DISTANCEFROM TRUNK OF PLANT*6" FOR 1 GALLON PLANTS 12" FOR 5 & 15 GALLON PLANTS SCH 40 PVCSxSxT TEE OR ELL.
WATER WELL,SEE PLANTINGDETAIL.
1/2" FLEXIBLE PVC RISER WITH1/2" MIPT MALE ADAPTERS.GPH: GIH12 FINISHED GRADE.
CITY OF LANCASTER120STANDARDDETAILROTOR POP-UPSPRINKLER FINISH GRADEROTOR POP-UP SPRINKLER:PER IRRIGATION LEGENDAND SPECIFICATIONSPVC SCH 80 NIPPLE(LENGTH AS REQUIRED)PVC SCH 40 ELLPVC SCH 40 STREET ELLPVC SCH 80 NIPPLE(LENGTH AS REQUIRED)PVC SCH 40 STREET ELL PVC SCH 40 TEE OR ELLPVC LATERAL PIPE
NOTE:·A SWING JOINT ASSEMBLY MAY BE USED WITH FLOWS LESS THAN 4 GPM.
NOTE:CITY OF LANCASTER123ASTANDARDDETAIL12" POP-UP SPRAYSPRINKLER ·A SWING JOINT ASSEMBLY MAY BE USED WITH FLOWS LESS THAN 4 GPM.
POP-UP SPRAY SPRINKLER:RAIN BIRD 1812-SAM/PRS
FINISH GRADE/TOP OF MULCH
PVC SCH 80 NIPPLE(LENGTH AS REQUIRED)PVC SCH 40 ELLPVC SCH 40 STREET ELLPVC SCH 80 NIPPLE(LENGTH AS REQUIRED)PVC SCH 40 STREET ELLPVC LATERAL PIPEPVC SCH 40 TEE OR ELL
PLANT MATERIAL
CITY OF LANCASTER123BSTANDARDDETAIL6" POP-UP SPRAYSPRINKLER POP-UP SPRAY SPRINKLER:RAIN BIRD 1806-SAM/PRSFINISH GRADE/TOP OF MULCH 1/2-INCH MALE NPT x .490 INCH BARB ELBOW: RAINBIRD MODEL SBE-050SWING PIPE, 12-INCH LENGTH: RAIN BIRDMODEL SP-100PVC SCH 40 TEE OR ELL1/2-INCH MALE NPT x .490 INCH BARB ELBOW: RAINBIRD MODEL SBE-050PVC LATERAL PIPE NOTE:·A SWING JOINT ASSEMBLY MAY BE USED WITH FLOWS LESS THAN 4 GPM.
CITY OF LANCASTER126STANDARDDETAILTREE BUBBLER
ROOT WATERING SYSTEM:RAIN BIRD RWS-B-C-1402 (INCLUDES 14020.50 GPM BUBBLER WITH RISER, GRATE,SWING ASSEMBLY, 1/2" MALE NPT INLET,AND BASKET CANISTER) BUBBLER: RAIN BIRD 1402 0.50 GPM(INCLUDED)4-INCH GRATE (INCLUDED)
RWS SAND SOCK (RWS-SOCK)FOR SANDY SOILSFINISH GRADE
1/2-INCH PVC SCH 80 NIPPLE (INCLUDED)1/2-INCH 90-DEGREE ELBOW (INCLUDED)12-INCH SWING ASSEMBLY (INCLUDED) 1/2-INCH MALE NPT INLET (INCLUDED)PVC SCH 40 TEE OR ELLATERAL PIPE4-INCH DIA. x 36-INCH BASKET WEAVE CANISTER(INCLUDED) CITY OF LANCASTER201STANDARDDETAILA.C.PATH
APPLY AN APPROVED SOIL STERILANT.INSTALL PER MANUFACTURER'SRECOMMENDATIONS.
SCARIFY SUBGRADE TO6" DEPTH & COMPACT.
10% MAX. LONGITUDINAL SLOPE% 2% MIN. CROSS-SLOPE.
PROVIDE SMOOTH TRANSITON TO SLOPES3" DEPTH A.C.OVER 90% COMPACTEDSUBGRADE10' MIN. WIDTHFLUSH CITY OF LANCASTER202STANDARDDETAILEQUESTRIANTRAIL
APPLY AN APPROVED SOIL STERILANTPER THE MANUFACTURER'SRECOMMENDATIONS.
TOP OF SUBGRADEMOISTEN SOIL & COMPACT TO90% WITH 350 LB. ROLLER PROVIDE SMOOTH TRANSITON TO SLOPES10' MIN. WIDTH
CITY OF LANCASTER203A-1STANDARDDETAILCONCRETE MOWSTRIP
COMPACTED SUB GRADECONCRETE MOWSTRIP
#3 REBAR (TYP).OVERLAP 30X BAR DIAMETER.JOIN WITH TIE WIRE.
FINISH GRADE(GROUNDCOVER AREAS)6" WIDTH12" RADIUS ON EXPOSEDCORNERS (TYP) 6" DEPTH2" 1"
CITY OF LANCASTER
NOTES:
204
1" CHAMFER (TYP.)2-1/4" X 5-5/8" MIDDLE RAIL
6"X6" POST W/ PRE-PUNCHEDHOLES @ 8'-1" O.C.2-1/4" X 5-5/8" BOTTOM RAIL FINISH GRADE2"x 4" REDWOOD HEADER-WHERE TURFOCCURS ADJACENT TO TRAIL.CONCRETE FOOTING ALL MEMBERS ARE PRECAST-CONCRETEKENTUCKY RAIL FENCE. AVAILABLE FROM:RIALTO CONCRETE FENCE (714) 875-4200MEMBERS TO BE PAINTED W/MASONRY OR CONCRETE PAINT,(COLOR TO BE SELECTED BY CITY)CHANGE IN LINEAL DIRECTION REQUIRES 2POSTS-SIDE BY SIDE.END POSTS SHALL HAVE OPENSLOTS-FILLED WITH MORTAR & TEXTUREFINISHED PRIOR TO PAINTING. 17"2"12"3"18"5-3/4"9-1/4"5-3/4"2-1/4"42"
STANDARDDETAILCONCRETEEQUESTRIANFENCE
CITY OF LANCASTER205STANDARDDETAILSHRUB PLANTING
·REMOVE BASIN PRIOR TOEND OF MAINTANCE
COMPACTED BACKFILLROOTBALLBACKFILLTOP OF BALL 1" ABOVEFINISHED GRADE PLANT TABS(NO. PER SPEC'S)
TEMPORARY BASIN6" FROM ROOT BALLFINISH GRADE1 12 x DEPTH2 x DIAMETER 6"
OF BALL
OF BALL6"
NOTES:
1 12 x DEPTH2 x DIAMETER
CITY OF LANCASTER206
6"
SHRUB PLANTING(SLOPE)STANDARDDETAIL
PLANT-TABS(NO. PER SPEC'S)COMPACTED BACKFILLBACKFILLROOTBALL PERMANENT BASIN6" FROM ROOT BALL
EXISTING SLOPE
OF BALLOF BALL1"
CITY OF LANCASTER207
NOTE:
3'
TYING DETAIL
TREE PLANTINGSTANDARDDETAIL
·2 BUBBLERS EACH TREEAS PER DETAIL 209
4"Ø X 3' PVC PERFORATEDPIPE. 2 PER TREE, OPPOSITESIDES FROM STAKES. FILL W/3/4" CRUSHED ROCK. INSTALLBUBBLERS IN PIPES. 'ARBOR GUARD' MUST BEUSED IN ALL TURF AREAS
COMPACTED BACKFILLBACKFILLPLANT TABS (NO. PER SPEC'S)ROOTBALL PERMANENT BASIN 12" LARGERDIA. THAN CONTAINER SIZE.FINISH GRADE 24" BOX & 15 GAL. TREES*12 B.W.G. GAL WIRE W/RUBBER HOSE COVER
PREVAILING WINDTOP ELEVATIONWIRESTAKEHOSE TIETREE
PVC CAP7' MIN. *8"
2 x DIAMETEROF BALL
12"4"
COPPER NAPTHENATE TREATEDLODGEPOLE PINE STAKES,3"DIA x MIN.10' LONG,3 REQUIRED
DO NOT OVER TIGHTENCINCH TIES, ALLOW TREETO MOVE SOMEWHAT TOBUILD CALIPER 7' MIN. *3'1 12 x DEPTH
CITY OF LANCASTER208
NOTE:STANDARDDETAILTREE PLANTING(SLOPE)
·2 BUBBLERS EACH TREEAS PER DETAIL 209
COMPACTED AMMENDEDSOIL MIXPLANT-TABS(NO. PERSPEC'S)BACKFILLROOTBALL ARBOR GUARD(TURF AREAS)EXISTING SLOPE(3) LODGE POLE STAKES 3" DIA.10' LONG (8' PER 15 GAL)(SEE SECTION II P31) RUBBER CINCH TIES* USE 10' STAKE FOR 24" BOXTREES AND 8' STAKE FOR15 GALLON TREES.
PREVAILING WIND
24" BOX & 15 GAL. TREESPERMANENT BASIN 12"LARGER DIAMETERTHAN CONTAINER SIZE SEE DETAIL 207FOR DRAINAGEPIPE & BUBBLERDETAIL.OF BALLOF BALL2 x DIAMETER 6"
TYING DETAILTOP ELEVATIONWIRESTAKEHOSE TIETREE
CITY OF LANCASTER209
NOTE :
TREE PLANTING(TREE WELL)STANDARDDETAIL
·SEE BUBBLER HEAD/DEEP WATERING PIPEDETAIL FOR HEAD ASSEMBLYUNDISTURBED SOIL BACKFILL MIX(SEE SPECS.)4"x3'-0" PVC PIPE(PERFORATED) FILLED W/3/4" CRUSHED ROCK'DEEP ROOT' PLANTERSEE DETAILPVC SCH.40 TEE 1/2" Ø PVC. SCH. 80NIPPLE1/2" Ø SCH. 40STREET 90°(2)PVC CAPBUBBLER HEAD (SEE IRRIG.PLAN FOR MAKE & MODEL).PRECAST PERMEABLETREE WELL COVERPVC LATERAL(SEE IRRIG. PLANFOR SIZE).CONC. SLAB 3 7
6 10836" 6
215
9 4
36"
1.ROOT BARRIER TO EXTEND 5' TO EITHER SIDE OF TREE TRUNK2.ROOT BARRIER SHALL NOT ENCIRCLE THE TREE ROOTBALL3.INSTALL IN TRENCH WITH VERTICAL RIBS FACING TOWARDS THE TREE.4.TOP OF BARRIER TO BE FLUSH WITH TOP OF FINISH GRADE.
1.TREE PER PLANTING PLAN2.ROOTBALL3.STAKE PER 'TREE PLANTING' DETAIL4.EARTH WATERING BASIN PER 'TREE PLANTING' DETAIL5.FINISH GRADE6.DEEP ROOT BARRIER AT EDGE OF HARDSCAPE - 36" DEEP,10' LONG CENTERED ON TRUNK7.TREE PLANTING PIT8.STREET CURB PER STREET IMPROVEMENT PLANS9.COMPACTED BACKFILL MIX PER 'SOIL PREP SPECIFICATION'10.MULCH - DEPTH AND TYPE PER PLANTING PLAN11.CONCRETE PAVING PER PLAN CITY OF LANCASTER210AROOT BARRIERSTANDARDDETAIL
NOTES:
LEGEND:
1.ROOT BARRIER TO EXTEND 5' TO EITHER SIDE OF TREE TRUNK.2.ROOT BARRIER SHALL NOT ENCIRCLE THE TREE ROOTBALL.3.INSTALL ROOT BARRIER IN TRENCH WITH THE VERTICAL RIBS FACING TOWARDS THE TREE.4.INSTALL ROOT BARRIERS WHEN TREE IS LOCATED WITHIN 8' OF HARDSCAPE OR APROTECTED UTILITY.
1.TREE PER PLANTING PLAN2.DEEP ROOT BARRIER AT EDGE OF HARDSCAPE - MINIMUM OF 10' LONG, CENTERED ON TRUNK3.CONCRETE PAVING PER PLAN4.STREET CURB PER STREET IMPROVEMENT PLANS CITY OF LANCASTER210BROOT BARRIERPLAN VIEWSTANDARDDETAIL NOTES:
10'10' 8' OR LESS8' OR LESS
PLAN VIEW12 243
LEGEND:
CITY OF LANCASTER211GROUNDCOVERSPACINGSTANDARDDETAIL
ALL GROUND COVER TO BEPLANTED @ = SPACING(TRIANGULAR) PER O.C. SPACINGON PLANS EQUAL
EQUAL
EQUAL
CITY OF LANCASTER
ST.THRULEGEND:
212A
SIGHT AREA:
TREE PLACEMENTCONTROLLEDINTERSECTIONSTANDARDDETAIL
VEHICLEAPPROACHINGINTERSECTIONSIGHT AREA
FACE OF CURB
SIGHT LINE
CHECK ZONING ORDINANCESEC. 17.28.050FACE OF CURBSTOPSTREET ·NO PLANTS, AT MATURITY,WALL, ETC. OVER 24INCHES·NO MORE THAN 3 TREESWITH LOWEST BRANCHESA MIN. OF 10 FEET HIGH.·ALL HEIGHTS AREMEASURED FROM TOP OFCURB.
SIGHT LINEFACE OF CURB
B
15'15'
A DISTANCE APOSTEDSPEED LIMIT(MPH)DISTANCE(IN FEET)555045403530190230265300335370 DISTANCE BPOSTEDSPEED LIMIT(MPH)DISTANCE(IN FEET)55504540353090100105110125140 212BTREE PLACEMENTUNCONTROLLEDINTERSECTIONSTANDARDDETAIL 35'
35'SIGHT LINE
4 WAY INTERSECTIONDETAILSIGHTLINE AREA(TYPICAL ALL 4 CORNERS) 25'42'
T-INTERSECTION ORYIELD INTERSECTIONDETAILSIGHT AREASIGHT AREA
CITY OF LANCASTER
213STREET TREEPLACEMENTSTANDARDDETAIL
RCE DRAIN2'10'-15'10'25'-35'*
25'-35' *
3' MIN.METERUTILITYPOLES.L.CURB & GUTTER
F.H.
SIDEWALK
CURB & GUTTER
UNDERGROUNDSTRUCTURE
DRIVEWAYAPPROACHSIDEWALKS.L.
*SEE TREE LIST FOR PROPER SPACING
5' MIN
10'-15'5'
25'-35' *
5' MIN10'
10' MIN.10' MIN.
CITY OF LANCASTER
CITY OF LANCASTER
34 214SWING CHECKVALVESTANDARDDETAIL
10" ROUND VALVE BOX WITHLOCKING LIDFINISH GRADE
PVC MALE ADAPTER
2"X4" BRICK(2 TYP,)" WASHED ROCK
6"
1" SWING CHECK VALVE
·USE TEFLON TAPE ON ALL PVC THREADEDFITTINGS TYPICAL.·VALVE BOX AND LID TO BE TAN COLOR.NOTES:
DETAILP/RRADPSIGPMDESCRIPTIONMODEL NO.MANUFACTURERSYMBOLSAMPLE SPRINKLER HEAD LEGEND
DETAILMODEL & SIZEDESCRIPTIONSYMBOLSAMPLE LEGEND
215CITY OF LANCASTERSTANDARDDETAILIRRIGATIONTYPICAL SYMBOLS
APPENDIX G
Appendix G – Plant List
Last updated 04/22/2026
City of Lancaster Plant Palette
Urban Core Plant Palette
(Avenue I to L; 20th East to 30th West)
Trees
Botanical Name Height Common Name
Brahea armate 20’ Mexican Blue Palm Phoenix dactlifera 35’ Date Palm Brahea edulis 15’ Guadalupe Palm Chamaerops humils 15’ European Fan Palm
Parkinsonia X "Desert Museum 24” Box Desert Museum Palo Verde Lagerstroemia indica x fauriei 24” Box Muskogee Crape Myrtle
Shrubs
Botanical Name Height Common Name
Agave parryi truncata 4’ Artichoke Parry’s Agave Encelia farinosa 5’ Brittlebush Hesperaloe parviflora 5’ Red Yucca Macfadyena unguis-cati Yellow Trumpet Vine** Yucca gloriosa "Variegata" 5’ Variegated Spanish Dagger Callistemon 'Little John' 5’ Little John Dwarf Bottlebrush Opuntia basilaris 4’ Beavertail Priklypear Opuntua santarita 6’ Purple Prikly Pear Verbena gooddingii 5’ Scented Verbena Sphaeralcea ambigua 4’ Desert Globemallow Tecomaria capensis 4’ Cape Honeysuckle
*Decomposed granite in California Gold; Rock mulch in Mojave Gold, and Granite River Rock Boulders of varying sizes are also acceptable
**Installed along walls only
Last updated 04/22/2026
Rural Plant Palette
Trees
Botanical Name Height Common Name
Parkinsonia X "Desert Museum 24” Box Desert Museum Palo Verde Brahea edulis 15’ Guadalupe Palm Lagerstroemia indica x fauriei 24” Box Muskogee Crape Myrtle
Shrubs
Botanical Name Height Common Name
Echinocactus grusonii 5’ Golden Barrel Cactus Hesperoyucca whipplei 5’ Chaparral Yucca Macfadyena unguis-cati Yellow Trumpet Vine** Salvia dorrii 5’ Desert Sage
Parthenocissus x "hacienda creeper" Hacienda Creeper** Callistemon 'Little John' 5’ Little John Dwarf Bottlebrush Tecomaria capensis 4’ Cape Honeysuckle Hesperaloe parviflora 5’ Red Yucca
*Decomposed granite in California Gold; Rock mulch in Mojave Gold, and Granite River Rock Boulders of varying sizes are also acceptable
**Installed along walls only
Last updated 04/22/2026
Single Line Median Plant Palette
Shrubs
Botanical Name Spacing Common Name Callistemon 'Little John' 5’ Little John Dwarf Bottlebrush Hesperaloe parviflora 5’ Red Yucca
*Decomposed granite in California Gold; Rock mulch in Mojave Gold, and Granite River Rock Boulders of varying sizes are also acceptable
APPENDIX H
STANDARD IRRIGATION EQUIPMENT LIST
Ball Valves: Nibco brass ball valves 3/4” – 2” si ze
Gate Valves: Nibco cast iron 2 1/2” and larger si ze
Butterfly Valves: Matco cast iron 2 1/2” and large r size.
Wye Strainer: Wilkins 100YSBR – potable water sys tems Basket Strainer: Hayward #72 – reclaimed water sys tems Backflow Prevention: Febco 825YA – irrigation syst ems Febco 880 seres “N” type – irrigation systems
Febco 825Y – drinking fountains and bathrooms
Flow Meters: WeatherTRAK FlowHD – size as require d
Pressure Regulator: Wilkins 500HLR series where PO C static pressure exceeds 120 PSI Master Valve: Rainbird PESB w/ regulator
Valves: Rain Bird PESB series, Rain Bird EFB-CP s eries, potable water systems Rain Bird PESBR series – reclaimed water system s
Spray Heads: Rain Bird 1800-SAM-PRS
Bubbler Heads: Rain Bird 1400, Rain Bird 5QB, Hunt er PCB Tree Bubblers: Rainbird RWS-B-C-1402
Rotor Medium Rotor: Rain Bird 5000 series
Rotor Large Range: Rain Bird 6504
Quick Coupler: Rain Bird 44LRC – potable water sys tems Nelson 7642 – reclaimed water systems
Swing Check Valves: King Brothers, Inc.
Spring Check Valve: Hunter, King Brothers, Inc., F low Controls Pipe: Pacific Plastics, Cresline
Control Wire: Paige Cable #14UF AWG
Pipe Fittings: Dura “Deep socket”, Spears
Controllers: WeatherTRAK
Controller Connectivity: WeatherTRAK All-inclusive Controller Package(10 year data plan) Backflow Enclosure: LeMeur solid enclosure
Other Enclosures: LeMeur, V.I.T. Strongbox
Valve Boxes: N.D.S. Pro-Spec, Carson Spec Grade, Rainbird PVB Series Root Barriers: Deep Root UB 36-2
No equipment substitutions will be allowed without prior written approval by the Director. Equivalent equipment, materials, or processes must meet or exceed the City's minimum material, dimensional, and performance requirements.
-------------------------------------End of STANDARDS-------------------------------------------------