Cities Index.
2022-09-12_item_4.8_approve_change_order_no._2_with_nextgen_alpha_upfitting_for_purchase_installation_of_police_vehicle_equipt._for_lpd_fleet

Lathrop City Council
September 12, 2022

Document
2022-09-12_item_4.8_approve_change_order_no._2_with_nextgen_alpha_upfitting_for_purchase_installation_of_police_vehicle_equipt._for_lpd_fleet
Meeting
September 12, 2022
Body
Lathrop City Council
Pages
4
Original file
1.5 MB
Text extracted from the city's file for reading and search. Open the original on www.ci.lathrop.ca.us. That file is the official record.

ITEM 4. 8

CITY MANAGER' S REPORT
SEPTEMBER 12, 2022 CITY COUNCIL REGULAR MEETING
ITEM: APPROVAL OF CHANGE ORDER NO. 2 WITH NEXTGEN

ALPHA UPFITTING FOR THE PURCHASE AND

INSTALLATION OF POLICE VEHICLE EQUIPMENT FOR

RETROFITTING OF EXISTING POLICE DEPARTMENT
FLEET
RECOMMENDATION: Adopt Resolution Approving Change Order No. 2 with NextGen Alpha Upfitting for the Purchase and
Installation of Police Vehicle Equipment for
Retrofitting of Existing Police Department Fleet
SUMMARY:

On June 29, 2022, the City of Lathrop Police Department ( LPD) took over law enforcement services from the Sheriff' s Office. The Sheriff' s Office gradually began returning the Lathrop Police Services ( LPS) vehicles back to the City. Staff reviewed and inventoried the vehicles that were returned and identified four additional vehicles that would remain in the Lathrop Police Department' s fleet. The vehicles are two Chevy Tahoes that will be retrofitted as Watch Commander vehicles, a third Chevy Tahoe that will be used as our third K- 9 vehicle, and a Ford Fusion that will be used as our Community Resource Officer vehicle. The City has contracted with NextGen Alpha Outfitting ( NextGen) to outfit all of the City' s new and existing police vehicles.

As NextGen received each vehicle to retrofit, they identified additional equipment and components for the nine LPS vehicles that were not in the original approved contract.

The cost to retrofit the four additional vehicles and the additional equipment for the nine LPS vehicles is estimated at $ 123, 676. There are sufficient funds in Capital Improvement Project GG 21- 11 to cover the cost of the contract. Staff recommends that City Council approve Change Order No. 2 with NextGen Alpha Upfitting for the purchase and installation of police vehicle equipment for retrofitting of existing police department fleet.

BACKGROUND:

At the March 22, 2021, Special City Council Meeting, Council directed staff to create Capital Improvement Project ( CIP) GG 21- 11 to begin the creation of the new Lathrop Police Department, and implement the transition of law enforcement services from the San ) oaquin County Sheriff to the City. Council approved the purchase of new police vehicles and entered into a contract with NextGen Alpha Upfitting to upfit our new police vehicle fleet. On May 16, 2022, Council approved Contract Change Order No. 1 with NextGen Alpha Upfitting to retrofit nine LPS vehicles, two Motorcycles, and two Animal Control vehicles.

CITY MANAGER' S REPORT PAGE 2
SEPTEMBER 12, 2022 CITY COUNCIL REGULAR MEETING
CHANGE ORDER NO. 2 WITH NEXTGEN ALPHA UPFITTING FOR THE

PURCHASE AND INSTALLATION OF POLICE VEHICLE EQUIPMENT FOR

RETROFITTING OF EXISTING POLICE DEPARTMENT FLEET
On June 29, 2022, the City of Lathrop Police Department took over law enforcement services from the Sheriff' s Office, and the Sheriff' s Office gradually began returning the LPS vehicles to the City. As NextGen received each vehicle to retrofit, they identified additional equipment and components for the nine LPS vehicles that were not in the original approved Change Order No. 1.

The Lathrop Police Department has been in operation for over two months and there have been staff changes within the department and two new police officer positions added. Staff has reviewed and inventoried the returned vehicles, and has identified four additional vehicles that will remain in LPD' s fleet. The vehicles are two Chevy Tahoes that will be retrofitted as Watch Commander vehicles, a third Chevy Tahoe that will be used for our third K- 9 vehicle, and a Ford Fusion that will be used as our Community Resource Officer vehicle.

The table below shows the price change from Change Order No. l and the requested additional cost for the four vehicles that are requested for approval for Change Order No. 2.

Chan e Order No. l Chan e Order No. 2
NextGen NextGen NextGen NextGen Additional Cost
Est. No Contract New New Est.

Amount Est. No. No.

Tahoe CSO 22106 $ 15, 241. 66 22230 $ 18, 089. 52 2, 847. 86 Tahoe CSO 22106 $ 15, 241. 66 22230 $ 18, 089. 52 2 847. 86 Tahoe CSO 22106 $ 15 241. 66 22230 $ 18, 089. 52 2, 847. 86 Tahoe CSO 22106 $ 15, 241. 66 22228 $ 17, 770. 60 2, 528. 94 F- 150 CSO 22107 $ 14, 756. 09 22222 17 745. 54 2 989. 45 F- 150 CSO 22107 $ 14, 756. 09 22220 $ 15, 781. 87 1, 025. 78 Tahoe K- 9 22104 25 014. 20 22231 $ 26 936. 63 1 922. 43 Tahoe K- 9 22104 $ 25, 014. 20 22231 $ 26, 936. 63 1, 922. 43 Ford Utilit K- 9 22082 $ 20, 297. 02 22221 $ 22, 187. 02 1, 890. 00 Watch 22229 $ 29, 841. 36 29, 841. 36
Commander
Watch 22229 $ 29, 841. 36 29, 841. 36
Commander
CRO Vehicle 22223 $ 16, 233. 21 16 233. 21
Tahoe K- 9 22231 $ 26, 936. 63 26, 936. 63
Total Cost for Chan e Order No. 2 123, 675. 17
CITY MANAGER' S REPORT PAGE 3
SEPTEMBER 12, 2022 CITY COUNCIL REGULAR MEETING
CHANGE ORDER NO. 2 WITH NEXTGEN ALPHA UPFITTING FOR THE

PURCHASE AND INSTALLATION OF POLICE VEHICLE EQUIPMENT FOR

RETROFITTING OF EXISTING POLICE DEPARTMENT FLEET
REASON FOR RECOMMENDATION:

Due to staff changes and two new officer positions added, staff has identified the need for four additional vehicles to be added to LPD' s fleet that will need to be retrofitted to meet the approved specifications of the new Lathrop Police Department.

It was also identified that additional equipment is needed for the nine other LPS vehicles already being retrofitted by NextGen that was not in the original contract.

The cost for the four new vehicles and the additional equipment for the vehicles is estimated at $ 123, 676. There are sufficient funds in CIP GG Z1- 11 to cover the cost of the contract. Staff recommends that City Council approve Change Order No. 2 with NextGen Alpha Upfitting for the purchase and installation of police vehicle equipment for retrofitting of existing police department fleet.

FISCAL IMPACT:

There is sufficient funds in CIP GG 21- 11 to cover the cost of this contract. There is no fiscal impact to the City.

ATTACHMENTS:

A. Resolution Approving Change Order No. 2 with NextGen Alpha Upfitting for the Purchase and Installation of Police Vehicle Equipment for Retrofitting of Existing Police Department Fleet
B. Change Order No. 2 with NextGen Alpha Upfitting for the Purchase and Installation of Police Vehicle Equipment for Retrofitting of Existing Police Department Fleet
CITY MANAGER' S REPORT PAGE 3
SEPTEMBER 12, 2022 CITY COUNCIL REGULAR MEETING
CHANGE ORDER NO. 2 WITH NEXTGEN ALPHA UPFITTING FOR THE

PURCHASE AND INSTALLATION OF POLICE VEHICLE EQUIPMENT FOR

RETROFITTING OF EXISTING POLICE DEPARTMENT FLEET
APPROVALS:

Z---.

Raymond Bechler D te
Chief of Police
Cari .lames Date
Finance Dire t r
l- Zo Zz
Salvador Navarrete Date
City Attorney
Zo2L
Stephen J. S Date
City Manager
RESOLUTION NO. 22 -

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LATHROP APPROVING CHANGE ORDER NO. 2 WITH NEXTGEN ALPHA UPFITTING FOR

THE PURCHASE AND INSTALLATION OF POLICE VEHICLE EQUIPMENT FOR

RETROFITTING OF EXISTING POLICE DEPARTMENT FLEET
WHEREAS, at the March 22, 2021, Special City Council Meeting, Council directed staff to create Capital Improvement Project ( CIP) GG 21- 11 to begin the creation of the new Lathrop Police Department, and implement the transition of law enforcement services from the San Joaquin County Sheriff to the City; and WHEREAS, Council approved the purchase of new police vehicles and entered into a contract with NextGen Alpha Upfitting to upfit our new police vehicle fleet; and WHEREAS, on May 16, 2022, Council approved Contract Change Order No. 1 to retrofit nine Sheriff vehicles, two Motorcycles, and our two Animal Control vehicles; and
WHEREAS, on June 29, 2022, the Lathrop Police Department took over law enforcement services from the Sheriff' s Office for the City of Lathrop; and WHEREAS, the Sheriff's Office gradually began returning the Lathrop Police Services vehicles to the City; and
WHEREAS, as NextGen received each vehicle to retrofit, they identified additional equipment and components for the nine LPS vehicles that were not in the original approved contract; and
WHEREAS, the Lathrop Police Department has been in operation for over two months and there have been staff changes within the department and two new police officer positions added. Staff has reviewed and inventoried the returned vehicles, and has identified four additional vehicles that will remain in LPD' s fleet. The vehicles are two Chevy Tahoes that will be retrofitted as Watch Commander vehicles, a third Chevy Tahoe that will be used for our third K- 9 vehicle, and a Ford Fusion that will be used as our Community Resource Officer vehicle; and
WHEREAS, the cost for the four new vehicles and the additional equipment for the nine vehicles is estimated at $ 123, 676, and there is sufficient funds in CIP GG 21- 11 to cover the cost of the contract.

NOW THEREFORE, BE IT RESOLVED, that the City Council of the City of Lathrop does hereby approve Change Order No. 2 with NextGen Alpha Upfitting for the purchase and installation of police vehicle equipment for retrofitting of existing police department fleet.

The foregoing resolution was passed and adopted this 12th day of September 2022, by the following vote of the City Council, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

Sonny Dhaliwal, Mayor
ATTEST: APPROVED AS TO FORM:

Teresa Vargas, City Clerk Salvador Navarrete, City Attorney CHANGE ORDER NO. 2
qttachment B
Purchase and Installation of Police Vehicie
Equipment for Retro-fitting of Existing Police
Department Fleet City of Lathrop
CONTRACT CHANGE ORDER NO. 2

FOR THE PURCHASE AND INSTALLATION OF POLICE VEHICLE EQUIPMENT FOR

RETRO- FITTING OF EXISTING POLICE DEPARTMENT FLEET
Contractor: NextGen Alpha Upfitting
Address: 8400 Carbide Ct, Suite A
Sacramento, CA 95828
Change Order Date: September 2022
Notice to Proceed Date: February 10, 2022
Contract Execution Date: February 10, 2022
This contract change order augments or changes the following:
1) ADDITIONS TO CONTRACT
Pursuant to the provisions of the Contract Specifications and proposal attached as Exhibit A, you are hereby directed to make the herein described additions, and scope of work contracted for within the terms of the agreement between the City of Lathrop and NextGen Alpha Upfitting dated February 10, 2022.

I. CHANGES IN THE SPECIFICATIONS
A. None
II. ADDITIONS TO CONTRACT
NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL
1 Purchase and Installation of Police Vehicle 1 Lump $ 123, 676. 00 $ 123, 676. 00 Equipment to retrofit 2 watch commander Sum
vehicles, a third K- 9 vehicle, CRO vehicle,
and add additional equipment to 9 police
vehicles
TOTAL ADDITIONAL COST FROM THIS CHANGE ORDER NO. 2 123, 676. 00 TOTAL ADDITIONAL COST FROM CHANGE ORDER NO. 1 166, 432. 00 ORIGINAL CONTRACT AMOUNT 403, 955. 00
REVISED CONTRACT AMOUNT AFTER CHANGE ORDER NO. 2 694, 063. 00

END OF CHANGES)

DESCRIPTION OF WORK
See additions to contract. The contractor shall provide all labor, material, equipment and shall perform all incidental tasks as necessary to complete the change order.

TIME OF COMPLETION
The effective date of Change Order No. 1 is September 2022 and it shall terminate no later than June 30, 2023.

CHANGE ORDER NO. 2
Purchase and Instailation of Police Vehicie
Equipment for Retro-fitting of Existing Police
Department Fleet City of Lathrop

RELEASE AND WAIVER
Acceptance of this Contract Change Order constitutes a full and final resolution of all pending disputes between City and Contractor regarding scope of work and payment for work. Contractor accepts this Contract Change Order as full payment for all work performed to date and hereafter to be performed, up to and including Contract Change Order No. 2. Contractor releases and discharges City from any and all claims, demands, damages, actions and causes of actions and causes of action for injuries, damages or losses, whether known or unknown, foreseen or unforeseen, arising directly from Contractor' s work on this contract. Contractor expressly waives the provisions of California Civil Code, Section 1542, which reads as follows:

A general release does not extend to claims which the Creditor does not know or suspect to exist in his favor at time of executing the release, which if known by him must have materially affected his settlement with the debtor.

END OF SECTION)
CHANGE ORDER NO. 2
Purchase and Installation of Police Vehicle
Equipment for Retro-fitting of Existing Police
Department Fleet City of Lathrop
Recommended
By:

Raymond Bechler Date
Chief of Police
City of Lathrop
Approved As
To Form: ZSalvador Navarrete Date
City Attorney
City of Lathrop
Approved By:

Stephen J. Salvatore Date
City Manager
City of Lathrop
Accepted By
Contractor:

NextGen Alpha Upfitting Date
Print Name and Title
NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
8/ 5/ 2022 22223
Name/ Address
Lathrop Pd
940 River lslands Parkway,
Lathrop CA 95330 Ex h i b it A
Item Description Qty Rate Total
FUSION

LIGHTING
NG ORDER EMPLBOOK9Q- 073 MPOWER LIGHTBAR RW l 2, 395. 00 2, 395. 00T BW 54IN
SOS ENT2B3D Intersector Under Mirror Mount Light, 9- 32 Vdc, 1 134. 75 134. 75T w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual
Color- Red/White
SOS ENT2B3E Intersector Under Mirrar Mount Light, 9- 32 Vdc, 1 192. 75 192. 75T w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual Color- Blue/ White
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, IS" 4 192. 75 77LOOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- FRONT PUSH BUMPER

LIGHTING
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269. SOT hard wire w/ sync option, SAE Class 1& CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/Blue/ White- REAR LIC LIGHTS SOS ELUC3HOlOJ Universal UnderCover Screw-In LED InseR Single 2 92. 49 t84. 98T Light Kit, 9- 32 Vdc w/ 10' S- wire harness: includes
insert, Lens# 1 ( Extreme Angle)& Inline Flasher—
Dual Color Red/Blue- REAR TAIL LIGHT

STROBES
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 7 269. SOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRedBlue/ White- QUARTER PANEL LIGHTING NG ORDER QUARTER PANEL LIGHT BRACKET 2 14. 99 29. 98T
SIREN
SOS ENGSA582RSP 500 series remote siren with button control, 10- 16v 1 1, 049. 50 1, 049. 50T SOS ETSS I OOJ 100J Series Composite Speaker w/ Universal Bail 2 189. 99 379.98T Bracket- 100 watt
Phone# 916) 423- 5052
Totai
Web Site NEXTGENALPHAUPFITTING. NET

Page 1 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
ate Estimate#
Sacramento CA 95828
8/ 5/ 2022 22223
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total

CONSOLE
NG ORDER TPS AGFDPI- MNT FORD FUSION FLOOR l 0. 00 O. 00T PLATE
NG ORDER TPS CGMC- 14 14IN CENTER CONSOLE FORD l 414. 35 41435T FUSION
NG ORDER TPS FP- SO500- R SOUNDOFF FACEPLATE 1 39. 99 39. 99T NG ORDER ICOM RADIO FACEPLATE F7520- 1 I - ONE 1 39. 99 39. 99T

PIECE RADIO
TPS FP- USB- 2DC 2" FACEPLATE DC OUTLET/ USB CUTOUTS 1 58. 50 58. SOT

ELECTRONICS INCLUDED
TPS FP- BLNK1 1" BLANK FILLER PLATE 2 12. 99 25. 98T
TPS AC- INBHG INTERNAL DUAL BEVERAGE HOLDER 1 49. 95 49. 95T TPS AGMCMI MICROPHONE CLIP PLATE AND CLIP 2 12. 99 25. 98T

ASSEMBLY
NG ORDER TPS CM- SDMT- SL- LED CONSOLE 1 435. 00 435. 00T

SIDE- MOUNT WITH ROTATING&

EXTENDABLE SLIDE- ARM
TPS AC- TB- ARMMNT- 58 CONSOLE MOLJNTED HEIGHT ADJUSTABLE 1 169. 5 169. SST

ARMREST WITH STANDARD SIZE ARM REST

FOAM PAD

DOCKING STATION
NG ORDER GETAC 5410- DOCKING STATION MOCJNT 1 1, 295. 00 1, 295. 00T

WITH POWER
NG ORDER GETAC 5410 DOCKING STATION POWER 1 189. 99 189. 99T SUPPLY

GUNLOCK
TPS GM- SGRF- MNT DUAL WEAPON MOUNT 1 255. 00 255. 00T
TPS GM- B- SCIAR- BKT CLAMSHELL STYLE WEAPON LOCK 1 58. 00 58. 00T

BRACKET FOR AR STYLE RIFLES
TPS GM- B- OP- SCS- BKT HANDCUFF STYLE WEAPON LOCK 1 69. 00 69. 00T

BRACKET WITH MORE PITCH FOR AR

STYLE RIFLES WITH BOLT- ON

ACCESSORIES
NG ORDER SC 1 870 REMINGTON SHOTGLJN LOCK 1 118. 56 118. 56T NG ORDER SC 6 LJNIVERSAL GUN LOCK RATCHETING 1 169. 99 169. 99T STYLE
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 2 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
8/ 5/ 2022 22223
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
REAR
NG ORDER EQUIPMENT MOUNTING SLIDE TRAY/ 1 550. 00 SSO. 00T MODIFICATION TPS AGTRAY- CH50,
AGCHI I- TT-50 PLUS MODIFICATION

ACCESSORIES
NG ORDER NG PAR46N LED SPOTLIGHT 1 245. 00 245. 00T

REPLACEMENT
NG ORDER RADIO ANTENNA WHIP 1 66. 85 66. 85T
TSO 78815 17 FT RG58 The Laird MB8U vehicle roof mount 2 19. 99 39.98T antenna installation hardware kit is for
Motorola- style mobile antennas, 0— 1000 MHz.

This NMO mount is an all brass permanent mount
for a 3/ 4 in hole.

NG ORDER JD 425- 3816 MAGNETIC MIC 2 44. 95 89. 90T
NG ORDER NG7615 12V SOLENOID TIMER L1NIT 1 189. 99 189. 99T

ADJUSTABLE
NG ORDER 100A WG AUTOMOTIVE 12V CIRCUIT 1 32. 49 32. 49T

BREAKER
BSS 5026 ST Blade Fuse Block- 12 Circuits with Negative 1 49. 99 49.99T Bus and Cover
NG SHIP IN SHIPPING IN COST FROM VENDOR 1 325. 00 325. 00 NG INSTALATION INSTALLATION OF CUSTOMER SUPPLIED 1 1, 125. 00 1, 125. 00T

MODEM, RADIO AND AXON

SYSTEM( PRE- WIRE IF POSSIBLE)
NG SHOP SUPPLIES SHOP SUPPLIES- TO INCLUDE VEHICLE 1 289.99 289.99T

UPFIT- BRACKETS, FUSES, CLAMPS, WIRES,
LOOM, MISC ACCES50RIES
NG INSTALATION INSTALLATION LABOR CHARGE FOR 1 3, 225. 00 3, 225. 00

ABOVE EQUIPMENT PER LATHROP POLICE

DEPARTMENT SPEC
Sales Taac 7. 75% 912. 25
Phone# 916) 423- 5052
Tota i
Web Site NEXTGENALPHAUPFITTING.NET 16, 233. 21

Page 3 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
ate Estimate#
Sacramento CA 95828
8/ 5/ 2022 22220
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
CSO FORD F150

ALL AMBER WHITE LIGHTING ONLY

LIGHTING
NG ORDER EMPLBOOSD9- 2GE MPOWER LIGHTBAR AW 1 2, 395. 00 2, 395. 00T 54IN
NG ORDER SOS MPOWER TRAFFIC ADVISOR AMBER 1 659. 76 659. 76T SOS EMPS2SMSSRAW mpower 4" Fascia Light w/ Screw Mount, 18" 4 134. 75 539.00T hard wire w/ sync option, SAE Class 1 & CA Tide
13, 9- 32 Vdc, Black Housing, 18 LED,-
AmbedWhite- FRONT PUSH BUMPER LIGHTS
NG ORDER SOS ENT2B3F Intersector Under Mirror Mount 2 192. 75 385. SOT Light, 9- 32 Vdc, w/ 4- Wedges, Mounting Gasket&
Hardware, 16 LEDs, Dual Color- AMBER/ White
NG ORDER SOS ELUC3HOl0A Universal UnderCover 2 92. 49 184. 98T Screw- In LED Insert Single Light Kit, 9- 32 Vdc w/
10' S- wire harness: includes insert, Lens# 1
Extreme Angle)& Inline Flasher— AMBERREAR TAIL LIGHT STROBES SOS EMPS2SMSSRAW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269.SOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32 Vdc, Black Housing, 18 LED,-
Amber/ White- ON TAIL GATE MOiJNTUPPER UNDER TOP RIDGE SOS EMPS2SMSSRAW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269. SOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32 Vdc, Black Housing, 1 S LED,-
Amber/White- UNDER TAILGATE
SIREN
SOS ENGSA582RSP 500 series remote siren with button control, 10- lbv 1 1, 049. 50 1, 049. SOT SOS ETSS 100J IOOJ Series Composite Speaker w/ Universal Bail 2 189. 99 379. 98T Bracket- 100 watt

CONSOLE
Phone# 916) 423- 5052
Tota 1
Web Site NEXTGENALPHAUPFITTINGNET

Page 1 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
8/ 5/ 2022 22220
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
NG ORDER TPS CG21F1- 0713- OS 2021+ Ford FI50 20" 1 679. 16 679. 16T wide- body console; open storage along drivers
side; 7" slope, 13" level
NG ORDER TPS FP- SO500- R SOUNDOFF FACEPLATE 1 0. 00 O. 00T NG ORDER ICOM RADIO FACEPLATE F7520- 1 I- ONE I 0. 00 O. 00T

PIECE RADIO
TPS FP- BLNK2 2" BLANK FILLER PLATE 3 0. 00 O. 00T
TPS FP- BLNK1 1" BLANK FILLER PLATE 3 0. 00 O. 00T
TPS FP- USB- 2DC 2" FACEPLATE DC OUTLET/ U5B CUTOUTS 1 58. 50 58. SOT

ELECTRONICS INCLUDED
TPS AC- INBHG INTERNAL DUAL BEVERAGE HOLDER 1 49. 95 49. 95T TPS AC- MCM 1 MICROPHONE CLIP PLATE AND CLIP 2 12. 99 25. 98T

ASSEMBLY
NG ORDER TPS CM- SDMT- SL- LED CONSOLE 1 435. 00 435. 00T

SIDE- MOUNT WITH ROTATING&

EXTENDABLE SLIDE- ARM
TPS AGSIDEARM- 6 6" SIDE- MOLJNT ARM REST 2 88. 75 177. SOT

DOCKING STATION
NG ORDER GETAC S410- DOCKING STATION MOLJNT 1 1, 295. 00 1, 295. 00T

WITH POWER
NG ORDER GETAC S410 DOCKING STATION POWER 1 189.99 189.99T SUPPLY
REAR
NG CUSTOM NGF150ELECBXI CUSTOM MADE 1 25. 00 525. 00T

UNDERSEAT BOX COVER FOR

ELECTRONICS AND EQUIPMENT

ACCESSORIES
NG ORDER RADIO ANTENNA WHIP 1 66. 85 66. 85T
TSO 78815 17 FT RG58 The Laird MB8U vehicle roof mount 1 19. 99 19. 99T antenna installation hardware kit is for
Motorola- style mobile antennas, 0—] 000 MHz.

This NMO mount is an all brass permanent mount
for a 3/ 4 in hole.

NG ORDER JD 425- 3816 MAGNETIC MIC 2 44. 95 89. 90T
NG ORDER NG7615 12V SOLENOID TIMER UNIT 1 189. 99 189. 99T

ADNSTABLE
Phone# 916) 423- 5052
Total
Web Site NEXTGENALPHAUPFITTING. NET

Page 2 ends

NextGen Alpha Upfitting Esti m ate
8400 Carbide Ct Suite A
ate Estimate#
Sacramento CA 95828
8/ s/ 2o22 22220
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
NG ORDER 100A WG AUTOMOTIVE 12V CIRCUIT 1 32. 49 32. 49T

BREAKER
BSS 5026 ST Blade Fuse Block- 12 Circuits with Negative 1 49.99 49.99T Bus and Cover
NG SHIP IN SHIPPING IN COST FROM VENDOR 325. 00 325. 00 NG INSTALATION INSTALLATION OF CUSTOMER SUPPLIED 1 1, 125. 00 1, 125. 00

MODEM, RADIO AND AXON

SYSTEM( PRE- WIRE IF POSSIBLE)
NG SHOP SUPPLIES SHOP SUPPLIES- TO INCLUDE VEHICLE 1 289. 99 289.99T

UPFIT- BRACKETS, FUSES, CLAMPS, WIRES,

LOOM, MISC ACCESSORIES
NG INSTALATION INSTALLATION LABOR CHARGE FOR 1 3, 225. 00 3, 225. 00

ABOVE EQUIPMENT PER LATHROP POLICE

DEPARTMENT SPEC
Sales Tax 7. 75% 798. 87
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET 15, 781. 87

Page 3 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
sisi2oz2 2222i
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
FORD UTILITY K9 L1NIT

LIGHTING
NG ORDER EMPLBOOK9Q- 073 MPOWER LIGHTBAR RW 1 2, 395. 00 2, 395. 00T BW 54IN
NG ORDER SOS MPOWER TRAFFIC ADVISOR AMBER 1 609. 75 609. 75T SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 4 134. 75 539.00T hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/Blue/ White- FRONT PUSH BUMPER LIGHTS
SOS ENT2B3D Intersector Under Mirror Mount Light, 9- 32 Vdc, 1 192. 75 192. 7ST w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual Color- Red/ White
SOS ENT2B3E Intersector Under Mirror Mount Light, 9- 32 Vdc, 1 192. 7 192. 75T w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual Color- Blue/ White
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, I S" 2 134. 75 269. SOT hard wire w/ sync option, SAE Class 1& CA Title
13, 9- 32
Vdc, Black Housing, 18 LED,- Red/ Blue

QUARTER PANEL LIGHTING
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269. SOT hard wire w/ sync option, SAE Gass 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, Tricolor- Red/ Blue

REAR LIC LIGHTS
SOS ELUC3H010J Universal UnderCover Screw- In LED Insert Single 2 92. 49 184. 98T Light Kit, 9- 32 Vdc w/ 10' S- wire harness: includes
insert, Lens# 1 ( Extreme Angle)& Inline Flasher—
Dual Color Red/ Blue- REAR TAIL LIGHT

STROBES
MD HE- TL1 White Auxiliary Lighting Pod- I. Sx3 Inch, 3 LED 2 48. 95 97. 90T

HATCH DOME LIGHT
MD HE- TL1R RED AUXILIARY LIGHTING POD- 1. SX3 1 589 58. 95T INCH, 3 LED- HATCH DOME LIGHT
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 1 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
aisi2o22 Zz.22i
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269. SOT hazd wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/Blue/White- REAR HATCH WARNING LIGHTS

PUSH BUMPER SETUP
NG ORDER WPS 36- 2055 PUSH BUMPER ELITE FORD 1 449. 00 449. 00T UTILITY 2018
NG ORDER WPS 36- 2055PB PIT BAR FORD UTILITY 2018 1 459. 00 459. 00T WPS 36- 6005SMP2 LIGHT CHANNEL SOUND OFF MPOWER 1 42. 49 42.49T SIREN
SOS ENGSA582RSP 500 series remote siren with button control, ] 0- 16v 1 1, 049. 50 1, 049. SOT SOS ETSS I OOJ 100J Series Composite Speaker w/ Universal Bail 2 189. 99 379. 98T Bracket- 100 watt

CONSOLE
NG ORDER TPS FLOOR PLATE FORD 2018 UTILITY 1 0. 00 O. 00T NG ORDER TPS CC- UV- L18 FORD POLICE 1 465. 00 465. 00T INTERCEPTOR UTILITY SPECIFIC 18"

CONSOLE
NG ORDER TPS FP- SO500- R SOUNDOFF FACEPLATE 1 0. 00 O. 00T NG ORDER ICOM RADIO FACEPLATE F7520- 11 - ONE 1 0. 00 O. 00T

PIECE RADIO
TPS FP- USB- 2DC 2" FACEPLATE DC OUTLET/ USB CUTOUTS 1 58. 50 58. SOT

ELECTRONICS INCLUDED
TPS FP- BLNK2 2" BLANK FILLER PLATE 2 0. 00 O. 00T
TPS FP- BLNKI 1" BLANK FILLER PLATE 2 0. 00 O. 00T
TPS AGINBHG INTERNAL DUAL BEVERAGE HOLDER 1 49. 95 49. 95T TPS AC- MCM1 MICROPHONE CLIP PLATE AND CLIP 2 12. 99 25. 98T

ASSEMBLY
TPS AGTB- ARMMNT- 58 CONSOLE MOLJNTED HEIGHT ADJUSTABLE 1 169. 55 169. SST

ARMREST WITH STANDARD SIZE ARM REST

FOAM PAD
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 2 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
8/ 5/ 2022 22221
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
NG ORDER TPS CM- SDMT- SL- LED CONSOLE 1 435. 00 435. 00T

SIDE- MOUNT COMPUTER MOUNT WITH

ROTATING& EXTENDABLE SLIDE- ARM

DOCKING STATION
NG ORDER GETAC S410- DOCKING STATI N MOUNT 1 1, 295. 00 1, 295. 00T

WITH POWER
NG ORDER GETAC 5410 DOCKING STATION POWER 1 189. 99 189. 99T SUPPLY

GUNLOCK
NG ORDER TPS GM-SGL-MNT SINGLE WEAPON MOUNT 2 192. 45 384. 90T TPS GM- B- SCIAR- BKT CLAMSHELL STYLE WEAPON LOCK 1 58. 00 58. 00T

BRACKET FOR AR STYLE RIFLES
TPS GM- B- OP- SCS- BKT HANDCUFF STYLE WEAPON LOCK 1 69. 00 69. 00T

BRACKET WITH MORE PITCH FOR AR

STYLE RIFLES WITH BOLT- ON

ACCESSORIES
NG ORDER SC 1 870 REMINGTON SHOTGiJN LOCK 1 118. 56 118. 56T NG ORDER SC 6 UNIVERSAL GUN LOCK RATCHETING 1 169. 99 169. 99T STYLE
K9 SETUP
K9 KENNEL SUPPLIED FROM OLD VEHICLE
BUILD
NG ORDER AK9 HAOFKIO- P 10" FAN ACCESSORY 1 129. 99 129. 99T NG ORDER AK9 NGHP- 5020 K9 HOT N POP PRO TEMP 1 1, 689. 55 1, 689. SST

ALARM WITH DOOR POP AND WINDOW
DROP
NG CUSTOM CUSTOM MADE BRACKETS FOR REAR BOX 1 250. 00 250. 00T

MOUNT MODIFICATION IN ORDER TO
WORK WITH K9 UNIT
NG ORDER PG SS0002 SAFESTOP SECURE IDLE SYSTEM 1 195. 00 19. 00T NG INSTALATION INSTALLATION OF K9 HEAT ALARM 1 1, 650. 00 1, 650. 00

SYSTEM WITH SAFESTOP UNIT,
REMOVE/ CLEAN UP AND RE- INSTALL K9
KENNEL
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 3 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828 8/ 5/ 2022 22221
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total

ACCESSORIES
NG ORDER NG PAR46N LED SPOTLIGHT REPLACEMENT 2 245. 00 490.00T NG ORDER RADIO ANTENNA WHIP 1 66. 85 66. SST
TSO 78815 17 FT RG58 The Laird MB8U vehicle roof mount 1 19. 99 I 9. 99T antenna installation hardware kit is for
Motorola- style mobile antennas, 0—] 000 MHz.

This NMO mount is an all brass permanent mount
for a 3/ 4 in hole.

NG ORDER JD 425- 3816 MAGNETIC MIC 2 44. 95 89. 90T
NG ORDER NG7615 12V SOLENOID T' IMER LINIT 1 189. 99 189. 99T

ADNSTABLE
NG ORDER IOOA WG AUTOMOTIVE 12V CIRCUIT 1 32. 49 32.49T

BREAKER
BSS 5026 ST Blade Fuse Block- 12 Circuits with Negative 1 49. 99 49.99T Bus and Cover
NG SHIP IN SHIPPING 1N COST FROM VENDOR 1 325. 00 325.00 NG INSTALATION INSTALLATION OF CUSTOMER SUPPLIED 1 1, 125. 00 1, 125. 00

MODEM, RADIO AND AXON

SYSTEM(PRE-WIRE IF POSSIBLE)
NG SHOP SUPPLIES SHOP SUPPLIES- TO INCLUDE VEHICLE 1 289. 99 289. 99T

UPFIT- BRACKETS, FUSES, CLAMPS, WIRES,

LOOM, MISC ACCESSORIES
NG INSTALATION INSTALLATION LABOR CHARGE FOR 1 3, 525. 00 3, 525. 00

ABOVE EQUIPMENT PER LATHROP POLICE

DEPARTMENT SPEC- RE- WIRE TO LATHROP
SPEC
Sales Tax 7. 75% 1, 119. 31
Phone# 916) 423- 5052
Total
Web Site NEXTGENALPHAUPFITTING. NET 22> 187. 02

Page 4 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
8/ 5/ 2022 22222
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
2020 FORD F150 SCHOOL RESOURCE

OFFICER - SRO

LIGHTING
NG ORDER EMPLBOOK9Q- 073 MPOWER LIGHTBAR RW 1 2, 395. 00 2, 395. 00T BW 54IN
NG ORDER SOS NFORCE TRAFFIC ADVISOR AMBER 1 659. 76 659. 76T SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 4 134. 75 539. 00T hard wire w/ sync option, SAE Class 1& CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- PUSH BUMPER LIGHTING SOS ENT2B3E Intersector Under Minor Mount Light, 9- 32 Vdc, 1 192. 75 192. 75T w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual Color- Blue/ White
SOS ENT2B3D Intersector Under Mirror Mount Light, 9- 32 Vdc, 1 192. 7 192. 75T w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual
Color- Red/ White
SOS EMPS25MSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269. SOT hazd wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/Blue/ White- ON TAIL GATE MOLJNTUPPER UNDER TOP RIDGE SOS ELUC3HOl OJ Universal UnderCover Screw- In LED Insert Single 2 92. 49 184. 98T Light Kit, 9- 32 Vdc w/] 0' S- wire harness: includes
insert, Lens# I( Extreme Angle)& Inline Flasher—
Dual Color Red/ Blue- REAR TAIL LIGHT

STROBES
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269. SOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/Blue/ White- iJNDER TAILGATE

PUSH BUMPER SETUP
NG ORDER WPS 36- 52065 PUSH BUMPER ELITEXD 1 699. 64 699. 64T Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 1 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
a/ s/ 2o22 22222
Name/ Address
Lathrop Pd
940 River Islands Pazkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
NG ORDER WPS 36- 52065PB PITBAR ELITEXD 1 545. 00 545. 00T WPS 36- 6015SMP2 Bumper Push Bar Top Channel Cover; Elite; For 1 49. 99 49.99T Westin Elite Series Bumper Push Bar; With 2
Soundoff MR6 Code Light Mounting Holes;
Powder Coated; Black; Steel
SIREN
SOS ENGSA582RSP 500 series remote siren with button control, 10- 16v 1 1, 049. 50 1, 049. SOT SOS ETSS I OOJ 100J Series Composite Speaker w/ Universal Bail 2 189. 99 379.98T Bracket- 100 watt

CONSOLE
NG ORDER PS CG21F1- 0713- OS 2021+ Ford FI50 20" 1 679. 16 679. 16T wide- body console; open storage along drivers
side; 7" slope, 13" level
TPS FP- S0380R TPS FP- SO500- R SOiJNDOFF FACEPLATE 1 0. 00 O. 00T NG ORDER ICOM RADIO FACEPLATE F7520- 11 - ONE 1 0. 00 O. 00T

PIECE RADIO
TPS FP- BLNK1 1" BLANK FILLER PLATE 3 0. 00 O. 00T
TPS FP- BLNK2 2" BLANK FILLER PLATE 3 0. 00 O. 00T
TPS FP- USB- 2DC 2" FACEPLATE DC OUTLET/ USB CUTOUTS 1 58. 50 58. SOT

ELECTRONICS INCLUDED
TPS AC- INBHG INTERNAL DUAL BEVERAGE HOLDER 1 49. 95 49. 95T TPS AGMCMI MICROPHONE CLIP PLATE AND CLIP 2 12. 99 25. 98T

ASSEMBLY
NG ORDER TPS CM- SDMT- SL- LED CONSOLE 1 435. 00 435. 00T

SIDE- MOUNT WITH ROTATING&

EXTENDABLE SLIDE- ARM
TPS AC- SIDEARM- 6 6" SIDE- MOLTNT ARM REST 2 88. 75 177. SOT

DOCKING STATION
NG ORDER GETAC S410- DOCKING STATION MOLJNT 1 1, 295. 00 1, 295. 00T

WITH POWER
NG ORDER GETAC 5410 DOCKING STATION POWER 1 189. 99 189. 99T SUPPLY

KEEP PARTITION SETUP WITH REAR CARGO

SEPERATORS- CLEAN AND TIGHTEN

E UIPMENT TRAY
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 2 ends

NextGen Alpha Upfitting Esti m ate
8400 Carbide Ct Suite A
ate Estimate#
Sacramento CA 95828
s/ s/ 2o22 22222
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
NG ORDER CUSTOM ELECTRONICS BOX/ COVER- 1 450.00 450.00T

DEPENDENT ON SETINA REAR SETUP

ORIGINALLY

ACCESSORIES
NG ORDER NG PAR46N LED SPOTLIGHT REPLACEMENT 2 245. 00 490. 00T NG ORDER RADIO ANTENNA WHIP 1 66. 85 66. 85T
TSO 78815 17 FT RG58 The Laird MB8U vehicle roof mount 2 19. 99 39. 98T antenna installation hardware kit is for
Motorola- style mobile antennas, 0—] 000 MHz.

This NMO mount is an all brass permanent mount
for a 3/ 4 in hole.

NG ORDER JD 425- 3816 MAGNETIC MIC 2 44. 95 89. 90T
NG ORDER NG7615 12V SOLENOID TIMER UNIT 1 189. 99 189. 99T

ADNSTABLE
NG ORDER 100A WG AUTOMOTIVE 12V CIRCUIT 1 32. 49 32. 49T

BREAKER
BSS 5026 ST Blade Fuse Block- 12 Circuits with Negative 1 49. 99 49. 99T Bus and Cover
NG SHIP IN SHIPPING IN COST FROM VENDOR 1 325. 00 325. 00 NG INSTALATION INSTALLATION OF CUSTOMER SUPPLIED 1 1, 125. 00 1, 125. 00

MODEM, RADIO AND AXON

SYSTEM( PRE- WIRE IF POSSIBLE)
NG SHOP SUPPLIES SHOP SUPPLIES- TO INCLUDE VEHICLE 1 289. 99 289. 99T

UPFIT- BRACKETS, FUSES, CLAMPS, WIRES,

LOOM, MISC ACCESSORIES
NG INSTALATION INSTALLATION LABOR CHARGE FOR 1 3, 325. 00 3, 325. 00

ABOVE EQUIPMENT PER LATHROP POLICE

DEPARTMENT SPEC
Sales Tax 7. 75% 932. 92
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET 17, 745. 54

Page 3 ends

NextGen Alpha Upfitting Esti m ate
8400 Carbide Ct Suite A
oate Estimate#
Sacramento CA 95828
s s 2o22 22230
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
CSO 2019/ 2020 CHEVY TAHOE x3

ALL AMBER/ WHITE LIGHTING ONLY

LIGHTING
NG ORDER EMPLBOOSD9- 2GE MPOWER LIGHTBAR AW 3 2, 395. 00 7, 185. 00T 54IN
NG ORDER SOS MPOWER TRAFFIC ADVISOR AMBER 3 659. 76 1, 979. 28T SOS EMPS2SMSSRAW mpower 4" Fascia Light w/ Screw Mount, 18" 12 134. 75 1, 617. 00T hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32 Vdc, Black Housing, 18 LED,-
Amber/ White- FRONT PUSH BUMPER LIGHTS
NG ORDER SOS ENT2B3F Intersector Under Mirror Mount 6 192. 75 1, 156. SOT Light, 9- 32 Vdc, w/ 4- Wedges, Mounting Gasket&
Hardware, 16 LEDs, Dual Color- AMBER/ White
SOS EMPS2SMSSRAW mpower 4" Fascia Light w/ Screw Mount, 18" 6 134. 75 808. SOT hard wire w/ sync option, SAE Class 1& CA Title
13, 9- 32 Vdc, Black Housing, 18 LED,-
Amber/ White- QUARTER PANEL LIGHTING
SOS EMPS2SMSSRAW mpower 4" Fascia Light w/ Screw Mount, 18" 6 134. 75 808. SOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32 Vdc, Black Housing, 18 LED,-
Amber/White- REAR LIC LIGHTS
NG ORDER SOS ELUC3HOl0A Universal UnderCover 6 92. 49 554. 94T Screw- In LED Insert Single Light Kit, 9- 32 Vdc w/
10' S- wire harness: includes insert, Lens# 1
Extreme Angle)& Inline Flasher— AMBERREAR TAIL LIGHT STROBES MD HE- TL1 White Auxiliary Lighting Pod- 1. 5x3 Inch, 3 LED 6 48. 95 293. 70T

HATCH DOME LIGHT
MD HE- TL1R RED AUXILIARY LIGHTING POD- I. SX3 3 58. 95 176. SST INCH, 3 LED- HATCH DOME LIGHT
SOS EMPS2SMSSRAW mpower 4" Fascia Light w/ Screw Mount, 18" 6 134. 7 808. SOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32 Vdc, Black Housing, 18 LED,-
Amber/ White- REAR HATCH WARNING
SIREN
SOS ENGSA582RSP 500 series remote siren with button control, 10- 16v 3 1, 049. 50 3, 148. SOT Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 1 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
sisi2o22 222so
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
SOS ETSSIOOJ 100J Series Composite Speaker w/ Universal Bail 6 189. 99 1, 139. 94T Bracket- 100 watt

CONSOLE
TPS CC- WBOS- 20 iJNIVERSAL 20" WIDE- BODY CONSOLE 3 609. 50 1, 828. SOT

WITH OPEN STORAGE
NG ORDER AGi' HIS- WB WIDE BODY CONSOLE BASE 3 0. 00 O. 00T NG ORDER TPS FP- SO500- R SOLJNDOFF FACEPLATE 3 0. 00 O. 00T NG ORDER ICOM RADIO FACEPLATE F7520- 11 - ONE 3 0. 00 O. 00T

PIECE RADIO
NG ORDER FP- DECORA 2" face plate w/( 1) AC duplex 3 39. 99 119. 97T outlet cut- out. Includes duplex outlet
TPS FP- BLNK2 2" BLANK FILLER PLATE 9 0. 00 O. 00T
TPS FP- BLNKI 1" BLANK FILLER PLATE 6 0. 00 O. 00T
TPS FP- USB- 2DC 2" FACEPLATE DC OUTLET/ USB CUTOUTS 3 58. 50 175. SOT

ELECTRONICS INCLUDED
TPS AC- INBHG INTERNAL DUAL BEVERAGE HOLDER 3 49.95 149. 85T TPS AC- MCM1 MICROPHONE CLIP PLATE AND CLIP 6 12. 99 77. 94T

ASSEMBLY
NG ORDER TPS CM- SDMT- SL- LED CONSOLE 3 435. 00 1, 305. 00T

SIDE- MOUNT WITH ROTATING&

EXTENDABLE SLIDE- ARM
TPS AGSIDEARM-6 6" SIDE- MOLINT ARM REST 6 88. 75 532.SOT NG ORDER CENTER CONSOLE USB EXTENSION( OEM) 3 19. 99 59. 97T

DOCKING STATION
NG ORDER GETAC 5410- DOCKING STATI N MOUNT 3 1, 295. 00 3, 885. 00T

WITH POWER
NG ORDER GETAC 5410 DOCKING STATION POWER 3 189. 99 569. 97T SUPPLY
REAR
NG CUSTOM CUSTOM MADE PLATFORM/ STORAGE- 3 2, 250. 00 6, 750. 00T BLACK RH1N0 TEXTURED- WITH 2 FRONT
COMPARTMENTS, 1 FOR ELECTRONICES
AND 1 FOR STORAGE, 3INCH LIP WITH" D"

RINGS AROUND THE PLATFORM

ACCESSORIES
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 2 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
sisi2o22 22230
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
NG ORDER RADIO ANTENNA WHIP 3 66. 85 200.SST
TSO 78815 17 FT RG58 The Laird MB8U vehicle roof mount 3 19. 99 59. 97T antenna installation hazdware kit is for
Motorola- style mobile antennas, 0— 1000 MHz.

This NMO mount is an all brass permanent mount
for a 3/ 4 in hole.

NG ORDER JD 425- 3816 MAGNETIC MIC 6 44. 95 269. 70T
NG ORDER NG7615 12V SOLENOID TIMER UNIT 3 189. 99 569. 97T

ADJUSTABLE
NG ORDER 100A WG AUTOMOTIVE 12V CIRCUIT 3 32. 49 97. 47T

BREAKER
BSS 5026 ST Blade Fuse Block- 12 Circuits with Negative 3 49.99 149. 97T Bus and Cover
NG SH1P IN SHIPPING IN COST FROM VENDOR 3 325. 00 975. 00 NG INSTALATION INSTALLATION OF CUSTOMER SUPPLIED 3 1, 125. 00 3, 375. 00

MODEM, RADIO AND AXON
SYSTEM( PRE- WIRE 1F POSSIBLE)
NG SHOP SUPPLIES SHOP SUPPLIES- TO INCLUDE VEHICLE 3 289. 99 869. 97T

UPFIT- BRACKETS, FUSES, CLAMPS, WIRES,

LOOM, MISC ACCESSORIES
NG INSTALATION INSTALLATION LABOR CHARGE FOR 3 3, 225. 00 9, 675. 00

ABOVE EQUIPMENT PER LATHROP POLICE

DEPARTMENT SPEC
Sales Tax 7. 75% 2,894. 55
Phone# 916) 423- 5052
Total
Web Site NEXTGENALPHAUPFITTING. NET 54, 268. 56

Page 3 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
8/ 5/ 2022 22231
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
2020 CHEVY TAHOE K9 UNIT x3

LIGHTING
NG ORDER EMPLBOOK9Q- 073 MPOWER LIGHTBAR RW 3 2,395. 00 7, 185. 00T BW 54IN
NG ORDER SOS MPOWER TRAFFIC ADVISOR AMBER 3 659. 76 1, 979. 28T SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 12 134. 75 1, 617. 00T hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- FRONT PUSH BUMPER LIGHTS
SOS ENT2B3D Intersector Under Mirror Mount Light, 9- 32 Vdc, 3 192. 7 578. 25T w/ 4- Wedges, Mounting Gasket& Hazdware, 16
LEDs, Dual
Color- Red/ White
SOS ENT2B3E Intersector Under Mirror Mount Light, 9- 32 Vdc, 3 192. 7 578. 25T w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual Color- Blue/White
SOS EMPS2SMSSRBW mpowerQ 4" Fascia Light w/ Screw Mount, 18" 6 134. 75 808. 50T hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED,- RedBlueQUARTER PANEL LIGHTING SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 6 134. 75 808. SOT hard wire w/ sync option, SAE Class 1& CA Title
13, 9- 32
Vdc, Black Housing, 18 LED,- Red/ Blue- REAR

LIC LIGHTS
SOS ELUC3HOIOJ Universal UnderCover Screw- In LED Insert Single 6 92. 49 554. 94T Light Kit, 9- 32 Vdc w/ 10' S- wire harness: includes
insert, Lens# 1 ( Extreme Angle)& Inline Flasher—
Dual Color Red/ Blue- REAR TAIL LIGHT

STROBES
MD HE- TL1 White Auxiliary Lighting Pod- I. Sx3 Inch, 3 LED 6 48. 95 293. 70T

HATCH DOME LIGHT
MD HE- TL1R RED AUXILIARY LIGHTING POD- I. SX3 3 58. 95 176. 85T INCH, 3 LED- HATCH DOME LIGHT
Phone# 916) 423- 5052
Total
Web Site NEXTGENALPHAUPFITTING. NET

Page 1 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
ate Estimate#
Sacramento CA 95828 8/ 5/ 2022 22231
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, I8" 6 134. 75 808. SOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/Blue/White- REAR HATCH WARNING LIGHTS

PUSH BUMPER SETUP
WPS 36- 53805 Bumper Push Bar; Elite T"' XD; Powder Coated; 3 696.00 2, 088. 00T Black; Steel; 3 Inch Diameter; Without
Wraparound Brush Guard; For Use With Optional
Top Channel( Sold Separately); With Mounting
Brackets
WPS 36- 53805PB Bumper Guard; Elite T"' XD; Powder Coated; 3 525. 00 1, 575. 00T Black; Steel; Requires Westin Public Safety
Bumper Push Bar
WPS 36- 6015SMP2 Bumper Push Bar Top Channel Cover; Elite; For 3 49. 99 149.97T Westin Elite Series Bumper Push Bar; With 2
Soundof' MR6 Code Light Mounting Holes;
Powder Coated; Black; Steel
SIREN
SOS ENGSA582RSP 500 series remote siren with button control, 10- 16v 3 1, 049. 50 3, 148. SOT SOS ETSS I OOJ 100J Series Composite Speaker w/ Universal Bail 6 189. 99 1, 139. 94T Bracket- 100 watt

CONSOLE
TPS CC- WBOS- 20 LTNIVERSAL 20" WIDE- BODY CONSOLE 3 609. 50 1, 828. SOT

WITH OPEN STORAGE
TPS AC- THIS- WB 2015- 20 Tahoe wide- body floor mount 3 0. 00 O. 00T NG ORDER TPS FP- SO500- R SOUNDOFF FACEPLATE 3 0. 00 O. 00T NG ORDER ICOM RADIO FACEPLATE F7520- 11 - ONE 3 0. 00 O. 00T

PIECE RADIO
NG ORDER FP- DECORA 2" face plate w/( 1) AC duplex 3 39. 99 l I 9. 97T outlet cut-out. Includes duplex outlet.

TPS FP- BLNK2 2" BLANK FILLER PLATE 9 0. 00 O. 00T
TPS FP- BLNKI 1" BLANK FILLER PLATE 6 0. 00 O. 00T
TPS FP- USB- 2DC 2" FACEPLATE DC OUTLET/ USB CUTOUTS 3 58. 50 175. SOT

ELECTRONICS INCLUDED
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 2 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
ate Estimate#
Sacramento CA 95828
sisi2o22 2223i
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
TPS AC- INBHG INTERNAL DUAL BEVERAGE HOLDER 3 49. 95 149. 85T TPS AC- MCMI MICROPHONE CLIP PLATE AND CLIP 6 12. 99 77.94T

ASSEMBLY
NG ORDER TPS CM- SDMT- SL-LED CONSOLE 3 435. 00 1, 305. 00T

SIDE- MOUNT WITH ROTATING&

EXTENDABLE SLIDE- ARM
TPS AGSIDEARM-6 6" SIDE- MOtJNT ARM REST 6 88. 75 532. SOT NG ORDER CENTER CONSOLE USB EXTENSION( OEM) 3 19. 99 59. 97T

DOCKING STATION
NG ORDER GETAC 5410- DOCKING STATION MOUNT 3 1, 295. 00 3, 885. 00T W1TH POWER
NG ORDER GETAC 5410 DOCKING STATION POWER 3 189. 99 569. 97T SUPPLY

GUNLOCK
TPS GM-SGL-MNT SINGLE WEAPON MOLJNT 6 192. 45 1, 154. 70T TPS GM- B- SCIAR-BKT CLAMSHELL STYLE WEAPON LOCK 3 58. 00 174. 00T

BRACKET FOR AR STYLE RIFLES
TPS GM- B- OP- SCS- BKT HANDCUFF STYLE WEAPON LOCK 3 69. 00 207. 00T

BRACKET WITH MORE PITCH FOR AR

STYLE RIFLES WITH BOLT- ON

ACCESSORIES
NG ORDER SC 1 870 REMINGTON SHOTGLTN LOCK 3 118. 56 35. 68T TPS SC6- 2 SC- 6 UNIVERSAL RATCHETING GLJNLOCK 3 169. 99 509. 97T WITH# 2 KEY
K9 SETUP
NG ORDER AA EZPF- TAH- IS- CURRENT- AA E/ Z RIDER 3 3, 245. 00 9, 735. 00T K9 INSERT WITH LED KIT, POWDER

COATED AND WATER DISH INCLUDED
NG ORDER AK9 HAOFKIO- P 10" FAN ACCESSORY 3 129. 99 389. 97T NG ORDER AK9 NGHP- 5020 K9 HOT N POP PRO TEMP 3 1, 689. 55 5, 068. 65T

ALARM WITH DOOR POP AND WINDOW
DROP
NG SHIP IN SHIPPING IN COST FROM VENDOR 3 725. 00 2, 175. 00 NG CUSTOM CUSTOM MADE BRACKETS FOR REAR BOX 3 250. 00 750. 00T

MOUNT MODIFICATION IN ORDER TO
WORK WITH K9 UNIT
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 3 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
8/ 5/ 2022 22231
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
PG SS0008 2017- 2020 Chevy Tahoe, Silverado( 1500, 2500,& 3 195. 00 585. 00T 3500) Chevy Suburban( I500
and 2500)
NG INSTALATION INSTALLLATION OF K9 KENNEL AND HEAT 3 1, 50.00 4, 650. 00 ALARM SYSTEM WITH SAFESTOP UN1T

ACCESSORIES
NG ORDER NG PAR46N LED SPOTLIGHT REPLACEMENT 6 245. 00 1, 470. 00T NG ORDER RADIO ANTENNA WHIP 3 66. 85 200. SST
TSO 78815 17 FT RG58 The Laird MB8U vehicle roof mount 3 19. 99 59.97T antenna installation hardware kit is for
Motorola-style mobile antennas, 0— 1000 MHz.

This NMO mount is an all brass permanent mount
for a 3/ 4 in hole.

NG ORDER JD 425- 3816 MAGNETIC MIC 6 44. 95 269. 70T
NG ORDER NG7615 12V SOLENOID TIMER UNIT 3 189. 99 569. 97T

ADNSTABLE
NG ORDER 100A WG AUTOMOTIVE 12V CIRCUIT 3 32. 49 97.47T

BREAKER
BSS 5026 ST Blade Fuse Block- ( 2 Circuits with Negative 3 49. 99 149. 97T Bus and Cover
NG SHIP IN SHIPPING IN COST FROM VENDOR 3 325. 00 975. 00 NG INSTALATION INSTALLATION OF CUSTOMER SUPPLIED 3 1,] 25. 00 3, 375. 00 MODEM, RAD10 AND AXON

SYSTEM( PRE- WIRE IF POSSIBLE)
NG SHOP SUPPLIES SHOP SUPPLIES- TO INCLUDE VEHICLE 3 289. 99 869. 97T

UPFIT- BRACKETS, FUSES, CLAMPS, WIRES,

LOOM, MISC ACCESSORIES
NG INSTALATION 1NSTALLATION LABOR CHARGE FOR 3 3, 525. 00 10, 575. 00

ABOVE EQUIPMENT PER LATHROP POLICE

DEPARTMENT SPEC
Sales Tax 7. 75% 4,247. 93
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTINGNET 80, 809. 88

Page 4 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
ate Estimate#
Sacramento CA 95828
sisi2o22 2222s
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
2018 CHEVY TAHOE- SPARE PATROL

LIGHTING
NG ORDER EMPLBOOK9Q- 073 MPOWER LIGHTBAR RW 1 2, 395. 00 2, 395. 00T BW 54IN
NG ORDER SOS MPOWER TRAFFIC ADVISOR AMBER 1 659. 76 659. 76T SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 4 134. 75 539. 00T hard wire w/ sync option, SAE Class 1& CA Title
13, 9- 32Vdc, Black Housing, I S LED, TricolorRed/Blue/ White- FRONT PUSH BUMPER

LIGHTING
SOS ENT2B3D Intersector Under Mirror Mount Light, 9- 32 Vdc, 1 192. 75 192. 75T w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual
Color- Red/ White
SOS ENT2B3E Intersector Under Mirror Mount Light, 9- 32 Vdc, 1 192. 7 192. 75T w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual Color- Blue/ White
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269. SOT hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- QUARTER PANEL LIGHTING SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269.SOT hard wire w/ sync option, SAE Class 1 & CA Title
l3, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- REAR LIC LIGHTS SOS ELUC3HOlOJ Universal UnderCover Screw- In LED Insert Single 2 92. 49 184. 98T Light Kit, 9- 32 Vdc w/ 10' S- wire harness: includes
insert, Lens# 1 ( Extreme Angle)& Inline Flasher—
Dual Color Red/ Blue- REAR TAIL LIGHT

STROBES
MD HE- TLl White Auxiliary Lighting Pod- I. Sx3 Inch, 3 LED 2 48. 9 97. 90T

HATCH DOME LIGHT
MD HE- TLIR RED AUXILIARY LIGHTING POD- 1. SX3 1 58. 95 58. 95T INCH, 3 LED- HATCH DOME LIGHT
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING.NET

Page 1 ends

NextGen Alpha Upfitting Esti m ate
8400 Carbide Ct Suite A
ate Estimate#
Sacramento CA 95828
8/ 5/ 2022 22228
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 2 134. 75 269.SOT hard wire w/ sync option, SAE Gass 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- REAR HATCH WARNING LIGHTS

PUSH BUMPER SETUP
WPS 36- 53805 Bumper Push Bar; Elite T"' XD; Powder Coated; 1 696. 00 696. 00T Black; Steel; 3 Inch Diameter; Without
Wraparound Brush Guard; For Use With Optional
Top Channel( Sold Separately); With Mounting
Brackets
WPS 36- 53805PB Bumper Guard; Elite r"' XD; Powder Coated; 1 525. 00 525. 00T Black; Steel; Requires Westin Public Safety
Bumper Push Bar
WPS 36- 6015SMP2 Bumper Push Bar Top Channel Cover; Elite; For I 49. 99 49.99T Westin Elite Series Bumper Push Bar; With 2
Soundoff MR6 Code Light Mounting Holes;
Powder Coated; Black; Steel
SIREN
SOS ENGSA582RSP 500 series remote siren with button control, 10- 16v 1 I, 049. 50 1, 049. SOT SOS ETSS100J 100J Series Composite Speaker w/ Universal Bail 2 189. 99 379. 98T Bracket- 100 watt

CONSOLE
NG ORDER TPS FP- SO500- R SOUNDOFF FACEPLATE 1 39. 99 39. 99T NG ORDER ICOM RADIO FACEPLATE 1 39. 99 39. 99T
NG ORDER TP- DECORA 2" face plate w/( 1) AC duplex 1 39. 99 39. 99T outlet cut- out. Includes duplex outlet
TPS FP- BLNK1 1" BLANK FILLER PLATE 2 12. 99 25. 98T
TPS FP- BLNK2 2" BLANK FILLER PLATE 3 12. 99 38. 97T
TPS FP- USB- 2DC 2" FACEPLATE DC OUTLET/ USB CUTOUTS 1 58. 50 58. SOT

ELECTRONICS INCLUDED
TPS AGINBHG INTERNAL DUAL BEVERAGE HOLDER 1 49. 95 49. 95T TPS AC- MCM1 MICROPHONE CLIP PLATE AND CLIP 2 12. 99 25. 98T

ASSEMBLY
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 2 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
sisi2o22 2222g
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
NG ORDER TPS CM-SDMT- SL- LED CONSOLE 1 435. 00 435.00T

SIDE- MOUNT WITH ROTATING&

EXTENDABLE SLIDE- ARM
TPS AGSIDEARM- 6 6" SIDE- MOLJNT ARM REST 2 88. 75 177. SOT NG ORDER CENTER CONSOLE USB EXTENSION( OEM) 1 19. 99 19. 99T

DOCKING STATION
NG ORDER GETAC 5410- DOCKING STATION MOUNT 1 1, 295. 00 1, 295. 00T

WITH POWER
NG ORDER GETAC S410 DOCKING STATION POWER 1 189.99 189. 99T SUPPLY

ACCESSORIES
NG ORDER NG PAR46N LED SPOTLIGHT REPLACEMENT 2 245. 00 490. 00T NG ORDER RADIO ANTENNA WHIP 1 66. 85 66.85T
TSO 78815 17 FT RG58 The Laird MB8U vehicle roof mount 2 19. 99 39.98T antenna installation hardware kit is for
Motorola- style mobile antennas, 0— 1000 MHz.

This NMO mount is an all brass permanent mount
for a 3/ 4 in hole.

NG ORDER JD 425- 3816 MAGNETIC MIC 2 44. 95 89. 90T
NG ORDER NG7615 12V SOLENOID TIMER LTNIT 1 189. 99 189. 99T AD7USTABLE
NG ORDER 100A WG AUTOMOTIVE 12V CIRCUIT 1 32. 49 32.49T

BREAKER
BSS 5026 ST Blade Fuse Block- 12 Circuits with Negative 1 49. 99 49. 99T Bus and Cover
NG SHIP IN SHIPPING IN COST FROM VENDOR 1 325. 00 325. 00 NG INSTALATION INSTALLATION OF CUSTOMER SUPPLIED 1 1, 125. 00 1, 125. 00T

MODEM, RADIO AND AXON

SYSTEM(PRE- WIRE IF POSSIBLE)
NG SHOP SUPPLIES SHOP SUPPLIES- TO INCLUDE VEHICLE 1 289. 99 289. 99T

UPFIT- BRACKETS, FUSES, CLAMPS, WIRES,

LOOM, MISC ACCESSORIES
NG INSTALATION INSTALLATION LABOR CHARGE FOR 1 3, 825.00 3, 825. 00

ABOVE EQUIPMENT PER LATHROP POLICE

DEPARTMENT SPEC
Sales Tax 7. 75% 979. 68
Phone# 916) 423- 5052
Total
Web Site NEXTGENALPHAUPFITTING. NET 17, 770. 76

Page 3 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
aisi2o2z lla2y
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
2020 CHEVY TAHOE- WATCH COMMANDER
x2

LIGHTING
NG ORDER EMPLBOOK9Q- 073 MPOWER LIGHTBAR RW 2 2,395. 00 4, 790. 00T BW 54IN
NG ORDER SOS MPOWER TRAFFIC ADVISOR AMBER 2 659. 76 1, 319. 52T SOS EMPS2SMS5RBW mpower 4" Fascia Light w/ Screw Mount, 18" S 134. 75 1, 078. 00T hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- FRONT PUSH BUMPER

LIGHTING
SOS ENT2B3D Intersector Under Mirror Mount Light, 9- 32 Vdc, 2 192. 75 385. SOT w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual
Color- Red/ White
SOS ENT2B3E Intersector Under Mirror Mount Light, 9- 32 Vdc, 2 192. 75 385. SOT w/ 4- Wedges, Mounting Gasket& Hardware, 16
LEDs, Dual Color- Blue/ White
SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 4 134. 75 539. 00T hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- QUARTER PANEL LIGHTING SOS EMPS2SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 4 134. 75 539. 00T hard wire w/ sync option, SAE Class 1 & CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- REAR LIC LIGHTS SOS ELUC3HOIOJ Universal UnderCover Screw- In LED Insert Single 4 92. 49 369. 96T Light Kit, 9- 32 Vdc w/ 10' S- wire harness: includes
insert, Lens# 1 ( Extreme Angle)& Inline Flasher—
Dual Color Red/ Blue- REAR TAIL LIGHT

STROBES
MD HE- TL1 White Auxiliary Lighting Pod- 1. Sx3 Inch, 3 LED 4 48. 95 195. 80T

HATCH DOME LIGHT
MD HE- TLIR RED AUXILIARY LIGHTING POD- I. SX3 2 58. 95 1 17. 90T INCH, 3 LED- HATCH DOME LIGHT
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET

Page 1 ends

NextGen Alpha Upfitting Esti m ate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828 aisi2o22 2222y
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
SOS EMP52SMSSRBW mpower 4" Fascia Light w/ Screw Mount, 18" 4 134. 75 539. 00T hard wire w/ sync option, SAE Class 1& CA Title
13, 9- 32
Vdc, Black Housing, 18 LED, TricolorRed/ Blue/ White- REAR HATCH WARNING LIGHTS

PUSH BUMPER SETUP
WPS 36- 53805 Bumper Push Bar; Elite T"' XD; Powder Coated; 2 696. 00 1, 392. 00T Black; Steel; 3 Inch Diameter; Without
Wraparound Brush Guard; Far Use With Optional
Top Channel( Sold Separately); With Mounting
Brackets
WPS 36- 53805PB Bumper Guard; Elite T"' XD; Powder Coated; 2 525. 00 1, OSO. 00T Black; Steel; Requires Westin Public Safety
Bumper Push Bar
WPS 36- 6015SMP2 Bumper Push Bar Top Channel Cover; Elite; For 2 49. 99 99. 98T Westin Elite Series Bumper Push Bar; With 2
Soundoff MR6 Code Light Mounting Holes;
Powder Coated; Black; Steel
SIREN
SOS ENGSA582RSP 500 series remote siren with button control, 10- 16v 2 1, 049. 50 2, 099. 00T SOS ETSS 100J IOOJ Series Composite Speaker w/ Universal Bail 4 189. 99 759. 96T Bracket- 100 watt

CONSOLE
TPS CC- WBOS- 20 LINIVERSAL 20" WIDE- BODY CONSOLE 2 609. 50 1, 219. 00T

WITH OPEN STORAGE
TPS AGTHIS- WB 2015- 20 Tahoe wide- body floor mount 2 0. 00 O. 00T NG ORDER TPS FP- SO500- R SOLJNDOFF FACEPLATE 2 0. 00 O. 00T NG ORDER ICOM RADIO FACEPLATE 2 0. 00 O. 00T
NG ORDER FP- DECORA 2" face plate w/( 1) AC duplex 2 39. 99 79.98T outlet cut- out. Includes duplex outlet
TPS FP- BLNK1 1" BLANK FILLER PLATE 4 0. 00 O. 00T
TPS FP- BLNK2 2" BLANK FILLER PLATE 6 0. 00 O. 00T
TPS FP- USB- 2DC 2" FACEPLATE DC OUTLET/ USB CUTOUTS 2 58. 50 117. 00T

ELECTRONICS INCLUDED
TPS AGINBHG INTERNAL DUAL BEVERAGE HOLDER 2 49. 95 99. 90T Phone# 916) 423- 5052
Total
Web Site NEXTGENALPHAUPFITTINGNET

Page 2 ends

NextGen Alpha Upfitting Estimate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
sisi2o22 22229
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Lathrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
TPS AGMCMI MICROPHONE CLIP PLATE AND CLIP 4 12. 99 51. 96T

ASSEMBLY
NG ORDER TPS CM- SDMT- SL- LED CONSOLE 2 435. 00 870. 00T

SIDE- MOUNT WITH ROTATING&

EXTENDABLE SLIDE- ARM
TPS AGSIDEARM- 6 6" SIDE- MOLJNT ARM REST 2 88. 75 177. 50T NG ORDER CENTER CONSOLE USB EXTENSION( OEM) 2 19. 99 39. 98T

OVERHEARD GUNLOCK
TPS GM- SGL- MNT SINGLE WEAPON MOUNT 2 192. 45 384. 90T TPS GM- B- SCiAR-BKT CLAMSHELL STYLE WEAPON LOCK 2 58. 00 1 16. 00T

BRACKET FOR AR STYLE RIFLES
TPS SC6- 2 SC- 6 UNIVERSAL RATCHETING GLJNLOCK 2 169. 99 339. 98T WITH# 2 KEY
NG INSTALATION CUSTOM OVERHEAD GUNLOCK MOUNTING 2 350. 00 700. 00

DOCKING STATION
NG ORDER GETAC S410- DOCKING STATION M UNT 4 1, 295. 00 5, 180. 00T W1TH POWER
NG ORDER GETAC S410 DOCKING STATION POWER 4 189. 99 759. 96T SUPPLY

TROY REAR COMMAND
NG ORDER TPS AS- CP- 2D7- MD- GB48- PB - REAR 2 5, 985. 00 11, 970. 00T

COMMAND BOX PER LATHROP TROY SPEC
NG ORDER TPS CP- FSWB- MFD REAR MAP BOARD POP 2 715. 50 1, 431. 00T UP
NG ORDER TPS CM- DH- SLDK- LED REAR COMPUTER 2 475. 00 950. 00T

SLIDE MOUNT
NG ORDER 2000w power invertor 2 259. 99 519. 98T
NG ORDER ICOM RADIO FACEPLATE 2 39. 99 79. 98T
TPS FP- BLNK2 2" BLANK FILLER PLATE 2 12. 99 25. 98T
NG ORDER AC POWER ACCESSORIES AND REAR 2 125. 00 250. 00T PLATES
NG INSTALATION REAR COMMAND BOX INSTALLATION 2 825. 00 1, 650.00

WITH POWER ACCESSOWES WITH

DOCKING STATION AND MOUNTING
Phone# 916) 423- 5052
Totai
Web Site NEXTGENALPHAUPFITTING. NET

Page 3 ends

NextGen Alpha Upfitting Esti m ate
8400 Carbide Ct Suite A
Date Estimate#
Sacramento CA 95828
sisiz. o22 ZZZz9
Name/ Address
Lathrop Pd
940 River Islands Parkway,
Laihrop CA 95330 Estimate good for 30 days.

Item Description Qty Rate Total
NG CUSTOM REAR ELECTRONICS COVER PLATE AND 2 250. 00 SOO. 00T

BRACKETS

ACCESSORIES
NG ORDER NG PAR46N LED SPOTLIGHT REPLACEMENT 4 245. 00 980. 00T NG ORDER RADIO ANTENNA WHIP 2 66. 85 133. 70T
TSO 78815 17 FT RG58 The Laird MB8U vehicle roof mount 4 19. 99 79. 96T antenna installation hardware kit is for
Motorola- style mobile antennas, 0— 1000 MHz.

This NMO mount is an all brass permanent mount
for a 3/ 4 in hole.

NG ORDER JD 425- 3816 MAGNETIC MIC 4 44.95 179. 80T
NG ORDER NG7615 12V SOLENOID TIMER LTNIT 2 189. 99 379. 98T

ADNSTABLE
NG ORDER 100A WG AUTOMOTIVE 12V CIRCUIT 2 32. 49 64.98T

BREAKER
BSS 5026 ST Blade Fuse Block- 12 Circuits with Negative 2 49. 99 99.98T Bus and Cover
NG SHIP IN SHIPPING IN COST FROM VENDOR 2 525. 00 1, 050. 00 NG INSTALATION INSTALLATION OF CUSTOMER SUPPLIED 2 1, 125. 00 2, 250. 00T

MODEM, RADIO AND AXON

SYSTEM( PRE- WIRE IF POSSIBLE)
NG SHOP SUPPLIES SHOP SUPPLIES- TO INCLUDE VEHICLE 2 350. 00 700.00T

UPFIT- BRACKETS, FUSES, CLAMPS, WIRES,

LOOM, MISC ACCESSORIES
NG INSTALATION INSTALLATION LABOR CHARGE FOR 2 3, 525. 00 7, 050.00

ABOVE EQUIPMENT PER LATHROP POLICE

DEPARTMENT SPEC

REAR TAHOE OEM SEATS NEEDED
Sales Tax 7. 75% 3, 541. 10
Phone# 916) 423- 5052
Tota I
Web Site NEXTGENALPHAUPFITTING. NET 59, 682. 72

Page 4 ends
← All documents from this meeting