Cities Index.
2022-12-12_item_4.13_approve_amendments_no._1_2_with_robertson-bryan_inc._for_the_surface_water_discharge_proj._cip_ww_20-17

Lathrop City Council
December 12, 2022

Document
2022-12-12_item_4.13_approve_amendments_no._1_2_with_robertson-bryan_inc._for_the_surface_water_discharge_proj._cip_ww_20-17
Meeting
December 12, 2022
Body
Lathrop City Council
Pages
8
Original file
1.6 MB
Text extracted from the city's file for reading and search. Open the original on www.ci.lathrop.ca.us. That file is the official record.

ITEM 4. 13

CITY MANAGER' S REPORT
DECEMBER 12, 2022 CITY COUNCIL REGULAR MEETING
ITEM: APPROVE AMENDMENTS NO. 1 AND NO. 2 WITH
ROBERTSON- BRYAN INC. FOR THE SURFACE WATER
DISCHARGE PRO) ECT, CIP WW 20- 17
RECOMMENDATION: Adopt Resolution Approving Amendments No. 1 and No. 2 with Robertson- Bryan Inc. to Further Assist
City with NPDES Permit Compliance for the
Consolidated Treatment Facility Surface Water
Discharge Project, CIP WW 20- 17
CEQA STATUS: Environmental review for the Surface Water Discharge Project, CIP WW 20- 17 as a whole was
completed in the Certified Final Environmental
Impact Report ( EIR) ( State Clearinghouse No.
2019110339).

SUMMARY:

The Surface Water Discharge Project Capital Improvement Project ( CIP) WW 20- 17 was created in order to obtain a National Pollutant Discharge Elimination System NPDES) permit to discharge effluent generated by the Lathrop Consolidated Treatment Facility ( LCTF) to the San Joaquin River. On November 8, 2021, City Council approved a Professional Services Agreement ( PSA) with Robertson- Bryan, Inc. ( RBI) to assist the City with meeting the requirements of the National Pollutant Discharge Elimination System ( NPDES) permit for the Consolidated Treatment Facility CTF) river discharge project.

Additional permit compliance services from RBI are needed for; 1) one- time tasks to prepare the LCTF for the discharge of effluent to the San Joaquin River and; 2) routine tasks needed for the continuing implementation of permit requirements through the end of 2023. RBI has provided two proposals to provide the additional permit compliance support services for a time and materials cost not to exceed; 1) $ 320, 824 for the one- time tasks and; 2) $ 259, 290 for the routine tasks.

Staff is recommending Council approve Amendments No. l and No. 2 to the PSA with RBI for LCTF NPDES permit compliance services. Sufficient funds were included in the adopted Fiscal Year 22/ 23 budget for CIP WW 20- 17 and CTF- MBR Sewer Fund 6080 to pay for these services.

BACKGROUND:

The Surface Water Discharge Project CIP, WW 20- 17 was created in order to obtain a NPDES permit to discharge effluent generated by the Lathrop Consolidated LCTF to the San Joaquin River.

CITY MANAGER' S REPORT PAGE 2
DECEMBER 12, 2022 CITY COUNCIL REGULAR MEETING
APPROVE AMENDMENTS NO. 1 AND NO. 2 WITH ROBERTSON- BRYAN INC.

FOR THE SURFACE WATER DISCHARGE PRO7ECT, CIP WW 20- 17
This project is needed to minimize future sewer rate increases, and support growth as the City' s wastewater flows increase and land becomes unavailable for the storage and disposal of recycled water. The RWQCB issued the NPDES permit in February, 2022, and construction of the outfall, river discharge pipeline and modifications at the LCTF needed for river discharge are nearing completion with river discharge anticipated to begin in the Spring of 2023.

On November 8, 2021, City Council approved a PSA with RBI to assist the City with meeting the requirements of the NPDES permit. Additional permit compliance services from RBI are needed for: 1) one-time tasks to prepare the LCTF for discharge of efFluent to the San Joaquin River, and 2) routine tasks needed for the continuing implementation of permit requirements through the end of 2023. RBI has provided two proposals to provide the additional permit compliance support services for a time and materials cost, not to exceed; $ 320, 824 for the one- time tasks, and $ 259, 290 for the routine tasks.

REASON FOR RECOMMENDATION:

The ability to dispose of effluent from the LCTF to the San Joaquin River is necessary to minimize future rate increases and support growth as the City' s wastewater flows increase and as land becomes unavailable for the storage and disposal of recycled water. Additional permit compliance support services from RBI are needed to assist the City met the NPDES permit and to begin river discharge.

CEQA STATUS:

Environmental review for the Surface Water Discharge Project, CIP WW 20- 17 as a whole was completed in the Certified Final Environmental Impact Report ( EIR) ( State Clearinghouse No. 2019110339). The EIR considered the full range of potential environmental effects of the Project. The Amendments with RBI fall within the scope analyzed in the EIR and no further environmental review is required in compliance with the California Environmental Quality Act ( CEQA).

FISCAL IMPACT:

The costs for the additional permit compliance services are to be provided for a time and materials cost, not to exceed; 1) $ 320, 824 for the one- time tasks under Amendment No. 1, and; 2) $ 259, 290 for the routine tasks under Amendment No. 2 for a total cost of$ 580, 114. The one- time tasks to prepare the LCTF for the discharge of effluent to the San Joaquin River will be paid from the Surface Water Discharge CIP WW 20- 17 and the routine tasks needed for the continuing implementation of permit requirements through the end of 2023 will be paid from the CTF- MBR Sewer Fund 6080.

CITY MANAGER' S REPORT PAGE 3
DECEMBER 12, 2022 CITY COUNCIL REGULAR MEETING
APPROVE AMENDMENTS NO. 1 AND NO. 2 WITH ROBERTSON- BRYAN INC.

FOR THE SURFACE WATER DISCHARGE PROJECT, CIP WW 20- 17
ATTACHMENTS:

A. Resolution Approve Amendment No. 1 and No. 2 with Robertson- Bryan Inc. for CIP WW 20- 17 Surface Water Discharge Project
B. Amendment No. 1 with Robertson- Bryan Inc. to provide Professional Services to Prepare the City of Lathrop Consolidated Treatment Facility for Discharge of Effluent to the San Joaquin River for the Surface Water Discharge Project, CIP WW 20- 17
C. Amendment No. 2 with Robertson- Bryan Inc. to provide Professional Services to Assist with Implementing all Requirements of the City of Lathrop Consolidated Treatment Facility NPDES Permit through December 2023 for the Surface Water Discharge Project, CIP WW 20- 17
CITY MANAGER' S REPORT PAGE 4
DECEMBER 12, 2022 CITY COUNCIL REGULAR MEETING
APPROVE AMENDMENTS NO. 1 AND NO. 2 WITH ROBERTSON- BRYAN INC.

FOR THE SURFACE WATER DISCHARGE PROJECT, CIP WW 20- 17
APPROVALS:
l Za Tiv2.2.

Greg Gi son Date
Senior Civil Engineer
i l l 2
Cari Ja s ; Date
Finance Dire r
1I- Z- Zo2.2
Michael King Date
Assistant City Manager
2-y - zo ZZ
Salvador Navarrete Date
City Attorney
lZ' • Z.Z
Step Salvatore Date
City Manager

ATTACHMENT
M
RESOLUTION NO. 22 -

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LATHROP APPROVING AMENDMENTS N0. 1 AND No. 2 WITH ROBERTSON- BRYAN INC.

TO FURTHER ASSIST CITY WITH NPDES PERMIT COMPLIANCE FOR THE

CONSOLIDATED TREATMENT FACILITY SURFACE WATER DISCHARGE PRO) ECT, CIP WW 20- 17
WHEREAS, the Surface Water Discharge Project Capital Improvement Project CIP) WW 20- 17 was created in order to obtain a National Pollutant Discharge Elimination System ( NPDES) permit to discharge effluent generated by the Lathrop Consolidated Treatment Facility ( LCTF) to the San Joaquin River; and WHEREAS, On November 8, 2021, City Council approved a Professional Services Agreement with Robertson- Bryan, Inc. ( RBI) to assist the City with meeting the requirements of the NPDES permit for the CTF river discharge which are anticipated to begin in the Spring of 2023; and
WHEREAS, additional permit compliance services from RBI are needed for; 1) one- time tasks to prepare the LCTF for discharge of effluent to the San Joaquin River, and; 2) routine tasks needed for the continuing implementation of permit requirements through the end of 2023; and
WHEREAS, RBI has provided two proposals to provide the additional permit compliance support services for a time and materials cost, not to exceed; 1) 320, 824 for the one-time tasks, and; 2) $ 259, 290 for the routine tasks for the LCTF permit compliance; and
WHEREAS, the one- time tasks to prepare the LCTF for the discharge of effluent to the San Joaquin River will be paid from the Surface Water Discharge CIP WW 20- 17 and the routine tasks needed for the continuing implementation of permit requirements through the end of 2023 will be paid from the CTF- MBR Sewer Fund 6080; and
WHEREAS, sufficient funds were included in the adopted Fiscal Year 22/ 23 budget for CIP WW 20- 17 and CTF MBR Sewer Fund 6080 to pay for these services; and
WHEREAS, environmental review for the Surface Water Discharge Project, CIP WW 20- 17 as a whole was completed in the Certified Final Environmental Impact Report ( EIR) ( State Clearinghouse No. 2019110339), and the EIR considered the full range of potential environmental effects of the Project; and WHEREAS, the Amendments with RBI fall within the scope analyzed in the EIR and no further environmental review is required in compliance with the California Environmental Quality Act ( CEQA).

NOW THEREFORE, BE IT RESOLVED, that the City Council of the City of Lathrop does hereby approve Amendment No. 1 and No. 2 with Robertson- Bryan, Inc. for a time and materials cost, not to exceed; $ 320, 824 for Amendment No. 1 to be paid from CIP WW 20- 17, and; 2) $ 259, 290 for Amendment No. 2 to be paid from CTF MBR Sewer Fund 6080 to provide additional permit compliance support services to assist City with NPDES permit compliance for the Consolidated Treatment Facility Surface Water Discharge Project, CIP WW 20- 17; and
NOW THEREFORE, BE IT FURTHER RESOLVED, that the City Council of the City of Lathrop does hereby determine that environmental review for the Surface Water Discharge Project, CIP WW 20- 17 as a whole was completed in the Certified Final Environmental Impact Report ( EIR) ( State Clearinghouse No. 2019110339).

The EIR considered the full range of potential environmental effects of the Project and that furthermore, the Amendment No. 1 and No. 2 with RBI fall within the scope analyzed in the EIR and no further environmental review is required in compliance with the California Environmental Quality Act ( CEQA).

The foregoing resolution was passed and adopted this 12th day of December 2022, by the following vote of the City Council, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

Sonny Dhaliwal, Mayor
ATTEST: APPROVED AS TO FORM:

Teresa Vargas, City Clerk Salvador Navarrete, City Attorney

ATTACHMENT
M
AMENDMENT NO. 1

TO THE AGREEMENT BETWEEN THE CITY OF LATHROP AND
ROBERTSON- BRYAN, INC. DATED NOVEMBER 8, 2021

TO PROVIDE PROFESSIONAL SERVICES TO PREPARE THE CITY OF

LATHROP CONSOLIDATED TREATMENT FACILITY FOR DISCHARGE
OF EFFLUENT TO THE SAN JOAQUIN RIVER - CIP WW 20- 17
THIS AMENDMENT ( hereinafter " AMENDMENT NO. 1") to the agreement between Robertson- Bryan, Inc. and the City of Lathrop dated November 8, 2021, hereinafter " AGREEMENT") dated for convenience this 12th day of December 2022, is by and between Robertson- Bryan, Inc. (" CONSULTANT") and the City of Lathrop, a California municipal corporation (" CITY");
RECITALS:

WHEREAS, CONSULTANT is specially trained, experienced, and competent to perform Professional Engineering Consulting Services for the City of Lathrop, which are required by this agreement; and
WHEREAS, CITY selected the CONSULTANT pursuant to said qualifications; and WHEREAS, on November 8, 2021, CONSULTANT and CITY entered into an AGREEMENT for Professional Engineering Consulting Services to Assist the CITY with NPDES Permit Compliance for the Consolidated Treatment Facility Surface Water Discharge Project, CIP WW 20- 17, in the amount not to exceed $ 294, 532; and WHEREAS, CONSULTANT provided scope of work attached hereto as Exhibit " A" for Amendment No. 1 to Provide Professional Services to Prepare the City of Lathrop Consolidated Treatment Facility for Discharge of Effluent to the San Joaquin River, CIP WW 20- 17; and
WHEREAS, CONSULTANT is willing to render such Professional Engineering Consulting Services, as hereinafter defined, on the following terms and conditions; NOW, THEREFORE, CONSULTANT and the CITY agree as follows:

AMENDMENT NO. 1 TO AGREEMENT
1) Scope of Service. Section ( 1) of the AGREEMENT is hereby amended to add the following:

CONSULTANT agrees to perform Professional Engineering Consulting Services in accordance with the scope of work and fee proposal provided by

Page 1 of 3 ends

CITY OF LATHROP— AMENDMENT NO. 1 TO PROVIDE PROFESSIONAL SERVICES

TO PREPARE THE CITY OF LATHROP CONSOLIDATED TREATMENT FACILITY FOR DISCHARGE OF EFFLUENT TO THE SAN JOAQUIN RIVER, CIP WW 20- 17 CONSULTANT, attached hereto as Exhibit " A" in addition to the scope of work in the original AGREEMENT dated November 8, 2021. CONSULTANT agrees to diligently perform these services in accordance with the upmost standards of its profession and to CITY'S satisfaction.
2) Compensation. Section ( 2) of the AGREEMENT is hereby amended as follows:

City hereby agrees to pay CONSULTANT an additional sum of 320 824 for the Professional Engineering Consulting Services set forth in Exhibit " A".

CONSULTANT shall be paid within thirty ( 30) days of receipt of billings containing all information contained in Paragraph 5 of the original AGREEMENT.

Compensation for any task must be equal to or less than the percentage of task complete. In no event shall CONSULTANT be entitled to compensation for work not included in the original scope of work and this AMENDMENT unless a written change order or authorization describing the extra work and payment terms has been executed by CITY'S Authorized Representative prior to the commencement of the work.
3) Effective Date and Term
The effective date of AMENDMENT NO. 1 is December 12, 2022, and it shall terminate no later than December 31, 2023. All other terms of the original AGREEMENT shall remain in full force and effect.
4) Applicabilitv to Oriqinal Consultant AGREEMENT
All terms and conditions set forth in the AGREEMENT dated November 8, 2021 are still in effect and are incorporated by reference herein and said AGREEMENT is incorporated by reference herein.
5) Siqnatures
The individuals executing this AMENDMENT NO. 1 represent and warrant that they have the right, power, legal capacity, and authority to enter into and to execute this AMENDMENT NO. 1 on behalf of the respective legal entities of the CONSULTANT and the CITY. This agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns.

Page 2 of 3 ends

CITY OF LATHROP— AMENDMENT NO. 1 TO PROVIDE PROFESSIONAL SERVICES

TO PREPARE THE CITY OF LATHROP CONSOLIDATED TREATMENT FACILITY FOR DISCHARGE OF EFFLUENT TO THE SAN JOAQUIN RIVER, CIP WW 20- 17 Approved as to Form: City of Lathrop
City Attorney
y- zZ
Salvador Navarrete Date
Recommended for Approval: City of Lathrop
Assistant City Manager
Michael King Date
Approved by: City of Lathrop
390 Towne Centre Drive
Lathrop, CA 95330
Stephen J. Salvatore Date
City Manager
Consultant: Robertson- Bryan, Inc.
3100 Zinfandel Drive
Rancho Cordova, CA 95670
Phone: ( 916) 714- 1801
Federal ID # 68- 0460693
Lathrop Business License # 20647
Signature Date
Print Name and Title

Page 3 of 3 ends

iBR.

RoeEarson- BRrAn, tnc.

Solutions for Progress
November 7, 2022

DELIVERED BY EMAIL
Mr. Michael King
Assistant City Manager
City of Lathrop
390 Towne Centre Dr.

Lathrop, CA 95330
Subject: Proposal to Provide Professional Services to Prepare the City of Lathrop Consolidated Treatment Facility for Discharge of Effluent to the San Joaquin River
Dear Mr. King:

Robertson- Bryan, Inc. ( RBI) has been assisting the City of Lathrop ( City) in preparing to discharge treated effluent from its Consolidated Treatment Facility ( CTF) to the San Joaquin River. In September of this year, RBI expended its funding under its current City contract, which covered river discharge preparation services for the prior 12 months ( 2022 Contract).

This proposal is for RBI services that need to be completed through the end of 2023 to further ready the City for initiation of river discharge ( anticipated for April 2023). These tasks are explained further in the detailed scope of work and budget provided below.

I. SCOPE OF WORK
TASK 1: VEOLIA O& M CONTRACT
Task 1. 1: Contract Negotiations
RBI will assist the City in negotiating and finalizing the operation and maintenance ( O& M) contract with Veolia Water West Operating Services, Inc. ( Veolia) to operate the CTF in compliance with the applicable sections of the National Pollutant Discharge Elimination System ( NPDES) permit and Waste Discharge Requirements/ Master Recycling Permit. RBI prepared the current draft O& M contract between Veolia and the City under our 2022 Contract. RBI will support the City in this effort with meeting attendance and incorporating requested edits to the draft contract. RBI will work with the City so the new contract provides clarity regarding roles and responsibilities for Veolia and the City, and responsibilities for compliance with the applicable sections of the NPDES permit and data gathering to ensure complete reporting consistent with the NPDES permit Monitoring and Reporting Program.

Task 1. 2: Meetings
RBI will attend up to four( 4) virtual meetings with the City and Veolia regarding contract negotiations and revisions.
3100 Zinfandel Drive, Suite 300 Phone 916. 714. 1801
Rancho Cordova, CA 95670 Fax 916. 714. 1804
www.robertson- bryan. com
Michael King RoeER sox- BR1'A! x
City of Lathrop
SolutFons forProgress
November 7, 2022

Page 2 ends

TASK 2: OPERATIONS TESTING
Task 2. 1: Testing Plan and Implementation
Prior to initiation of river discharge, RBI will work with the City, PACE, and Veolia to test operational procedures at the CTF to ensure that the monitoring and controls necessary for river discharge are properly functioning. RBI, in collaboration with PACE and Veolia, will prepare an operations testing plan with procedures to implement at the CTF to test the various river discharge- related monitoring and control systems. This testing will include, but not be limited to, the dechlorination system controls, effluent turbidity controls, and effluent temperature controls. RBI will work with PACE, Veolia, and the City to implement the testing, document results from the testing, and develop any modifications to existing systems as a result ofthe testing.

Deliverable:

Operations Testing Plan
Task 2. 2: Meetings
RBI will attend up to two ( 2) virtual meetings with the City, PACE, and Veolia regarding the operations testing plan development and implementation.

TASK 3: ELECTRONIC SMR PROCEDURES
Task 3. 1: Procetlures Development
RBI assists numerous Central Valley dischargers with preparing the electronic selfmonitoring reports ( SMRs) required by their NPDES permits. RBI will lead the City' s efforts to develop and implement procedures for preparing monthly electronic SMRs in a manner that ensures accurate and complete data are being reported. This effort will involve defining roles and responsibilities for Veolia, City, and RBL Electronic SMR reports have deadlines set by the NPDES permit that must be met for each time period. RBI will work with the City and Veolia to prepare " practice" electronic SMRs that include all information reyuired by the NPDES permit Monitoring and Reporting Program for the months of January, February, and March 2023 to ensure the procedures work effectively once discharge begins.

Deliverable:

Electronic SMR Procedures
Task 3. 2: Meetings
RBI will attend up to two ( 2) virtual meetings with the City and Veolia related to development of SMR procedures and implementation.

Michael King R08ER1 DH- BRYAI IIYG
City of Lathrop
SoluHonsforProgress
November 7, 2022

Page 3 ends

TASK 4: INDUSTRIAL PRETREATMENT PROGRAM
RBI completed a review of the City' s industrial pretreatment program ( IPP) in August 2022.

That review included a schedule of tasks to prepare an IPP update and submit the IPP to the Central Valley Water Board for approval, as shown below. The scope of work outlined in this task is for completing the tasks listed in the table below.

Task Task Description Timeframe
1 Local Limits Sampling and Analysis Plan Winter 2022/ 2023 2 ; Conduct Sampling and Analysis Early Summer 2023
3 Prepare Local Limits Update ~ Late Summer 2023
4 : Update Sewer Use Ordinance Fall 2023
5 ; Update Enforcement Response Plan Fall 2023
6 ; Update Implementation Procedures Fall/ Winter 2023
7 Prepare IPP Submission Package Winter 2023
8 Submit IPP to Central Valley Water Board forApproval February 1, 2024 This update is for the IPP submission to the Central Vailey Water Board for approval. After approval, then the City would update its ordinance formally through the Council.

Task 4. 1: Pollutants of Concern
The U.S. Environmental Protection Agency ( EPA) defines a " pollutant of concern" as any pollutant that might reasonably be expected to be discharged to a publically owned treatment works ( POTW) in sufficient amounts to cause pass through or interference, cause problems in its collection system, or jeopardize its workers. Regulations and restrictions that influence identification of pollutants of concern include NPDES permit effluent limitations, biosolids disposal restrictions, and treatment process inhibition levels. RBI will develop a list of pollutants of concern in accordance EPA guidance. These will be the pollutants that undergo evaluation for local limits. RBI will prepare a technical memorandum summarizing the pollutants of concern and rationale for being carried forward for local limits analysis. RBI will prepare a draft technical memorandum for City review and a final technical memorandum that addresses City comments.

Deliverable:

Technical Memorandum
Task 4. 2: Sampling and Analysis Plan
RBI will prepare a Sampling and Analysis Plan to guide collection of data needed to conduct the local limits analysis. The Sampling and Analysis Plan will define the pollutants to be sampled, sampling locations, number of samples to be collected, analytical methods, required laboratory detection limits, sample bottle types and preservation, quality assurance/ quality Michael King 1 08FR OH' BR1'+/ N
City of Lathrop
SoluKonsfarProgress
November 7, 2022

Page 4 ends

control requirements ( QA/QC), and sampling procedures. RBI will prepare a draft Sampling and Analysis Plan for City review and a final plan that addresses City commentsr Deliverable:

Sampling and Analysis Plan
Task 4. 3: Sampling and Analysis Support
RBI will provide support to the City with implementing the Sampling and Analysis Plan.

Support includes selecting an analytical laboratory to conduct the sampling and analysis, scheduling the sampling, and reviewing the analytical laboratory reports for completeness and ensure that QA/ QC objectives were met. This scope of work and budget assumes that the City will directly contract with the selected analytical laboratory for sampling and analysis services, and directly pay all laboratory charges for sampling and analysis.

Task 4. 4: Local Limits Update
RBI will conduct a local limits analysis consistent with EPA guidance using the CTF influent, effluent, and collection system data collected in accordance with the Sampling and Analysis Plan. RBI will conduct analyses for each pollutant to identify the allowable headworks loading, maximum allowable headworks loading, maximum industrial loading, and uniform local limits. RBI will compare results with local limits the City is required to implement for consistency with Manteca' s pretreatment program. RBI will prepare a draft Local Limits Report for City review and a final report that addresses City comments.

Deliverable:

Local Limits Update Report
Task 4. 5: Sewer Use Ordinance Update
RBI completed a detailed review of the City' s Sewer Use Ordinance under a previous scope of work and provided recommendations to revise and update the ordinance. RBI will prepare revisions to the sewer use ordinance based on these recommendations, in track changes format, and identify the rationale for the proposed change. Any local limits updates also will be shown in the track changes format. RBI will participate in one ( 1) meeting to present the proposed ordinance revisions and obtain City input. RBI will prepare a draft revised Sewer Use Ordinance for City review and a final revised ordinance that addresses City comments.

Deliverable:

Draft and Final Revised Sewer Use Ordinance
Task 4. 6: Enforcement Response Plan Update
RBI will review and update the City' s IPP Enforcement Response Plan to ensure that it aligns with EPA guidance and is consistent with revisions to the sewer use ordinance. RBI will Michael King I ERT OH' BRf'N l
City of Lathrop
Sotut/ ona forProgress
November 7, 2022

Page 5 ends

prepare revisions in track changes format and provide a rationale for the revisions. RBI will prepare a draft revised Enforcement Response Plan for City review and a final revised plan that addresses City comments.

Deliverable:

Enforcement Response Plan Update
Task 4. 7: Implementation Procedures Update
RBI will review and update the City' s IPP Implementation Procedures to ensure that they are clear and consistent with revisions to the sewer use ordinance. RBI will prepare revisions in track changes format and provide a rationale for the revisions. RBI will prepare draft revised Implementation Procedures for City review and final revised procedures that address City comments.

Deliverable:

Implementation Procedures Update
Task 4. 8: City Attorney Statement
The IPP submission must include a statement from the City' s attorney that the City has the authority to carry out the IPP. Required elements ofthe statement are defined in 40 CFR 4039(b)( 1). EPA' s Guidance Manual for POTW Pretreatment Program Development provides a sample attorney' s statement for use in preparing this element of the IPP submission. RBI will prepare a draft attorney statement for City review and comment. RBI will make revisions based on City comments and prepare a final statement for the City' s attorney to sign.

Deliverable:

Draft City Attorney Statement
Task 4. 9: Resources and Funding
The City is reyuired to establish that it has the budget, staffing, and equipment needs to implement the IPP. The City is to provide an organizational chart and brief description of the staff administering the IPP, per 40 CFR 4039( b)( 3). In addition, a description of funding levels and full- and part-time staff available to implement the IPP is required, per 40 CFR 4039( b)( 4). RBI will work closely with City staff to prepare the IPP organizational chart, a description of the staff administering the IPP, and plan for funding IPP implementation.

Deliverable:

IPP Organization Chart and Funding Plan
Michael King I FRT.sOM- BR t!
Cl Of L, 1t] COIJ
SolntionsforPrognss
November 7, 2022

Page 6 ends

Task 4, 10: IPP Submittal Package
RBI will compile the IPP elements prepared in the above tasks into single document that will comprise the City' s " Industrial Pretreatment Program" that can be submitted to the Central Valley Water Board for review and approvaL RBI also will coordinate with City staff to ensure IPP package is submitted to the Central Valley Water Board by deadline.

Deliverable:

IPP Submittal Package
Task 4. 11: Industrial User Permit Review
RBI will review current industrial user permits for consistency with any revisions made to the City' s Sewer Use Ordinance and local limits. In addition, RBI will review the industrial user permit application and provide recommended revisions, if necessary.

Deliverable:

Recommended Revisions to Industrial User Permit
Task 4. 12: Meetings
RBI will attend up to four ( 4) virtual meetings with the City related to development of the IPP.

TASK 5: T EMPERATURE COMPLIANCE
The following subtasks address data collection and evaluation to support operations for compliance with NPDES permit limitations for temperature.

Task 5. 1: CTF Effluent Monitoring
RBI has been collecting hourly CTF effluent temperature data for several years to build the dataset needed to adequately assess compliance with the Thermal Plan; however, current funding for this effort has been fully expended. An online effluent temperature probe for NPDES compliance monitoring is planned for installation by the end of 2022. In the interim, RBI recommends continuing to collect effluent temperature via the use of Onset Loggers. RBI will travel once per month to the CTF to download data from the Onset Loggers using a HOBO waterproof shuttle. RBI will download data from the shuttle into an MS Excel spreadsheet and review the data for abnormalities ( e. g., outliers, air temperature readings).

This scope of work is to continue this effluent temperature monitoring through December 2022.

Task 5. 2: Diversion to Cooling Pond Procedures
RBI will analyze the entire CTF effluent temperature data set to identify the statistical daily highs and averages by month. In addition, RBI will compile and analyze San Joaquin River temperature collected at the nearest monitoring station with data available on the California Michael King I OBERlxt7H' BR1'R 4 l
City of Lathrop
Solutions forFrogrcas
November 7, 2022

Page 7 ends

Data Exchange Center( CDEC) to identify the statistical daily averages and lows. From these analyses, RBI will identify the months when the difference between the CTF daily average effluent temperature and the river temperature has the potential to be > 20° F, and develop recommendations for timing diversion of CTF effluent to the cooling ponds relative to river temperature.

Deliverable:

Diversion to Cooling Pond Procedures
TASK 6: NPDES PERMIT MODIFICATIONS AND RECYCLED WATER GENERAL ORDER PERMITTING Task 6. 1: Permitting Assistance
RBI will assist the City and Woodard & Curran with obtaining coverage for the City' s recycled water ponds, remaining land application areas, and existing and future recycled water use areas under the State Water Resources Control Board' s Statewide General Order for Recycled Water Use ( Order WQ 2016- 0068- DDW) ( General Order). This General Order authorizes beneficial, non- potable recycled water uses consistent with the Uniform Statewide Recycling Criteria. In addition, RBI will review and comment on a land disposal facility closure plan ( to be prepared by Woodard & Curran) to support the Central Valley Water Board rescinding the City' s WDRs for land disposal. Finally, RBI will lead efforts needed to re- open and modify the NPDES permit to include language that also will facilitate rescinding the WDRs.

Task 6.2: Meetings
RBI will attend up to eight ( 8) virtual meetings with the City and Woodard & Curran related assisting with the Task 6. 1 scope. In addition, RBI will attend up to two ( 2) meetings with the Central Valley Water Board permitting staff.

Task 6.3: Board Hearing
RBI will prepare for and attend the Central Valley Water Board hearing at which the NPDES permit modifications and WDR rescission will be considered/adopted.

TASK 7: ADDITIONAL SERVICES
This task provides funding to be used to provide additional RBI services as directed by the City, as the need arises. This facilitates timely and effectively addressing unanticipated or expanded issues as they arise without delays that would otherwise be incurred to seek a contract remedy prior to proceeding. Work under this task will be at the direction of the City Manager or Assistant City Manager.

TASK 8: PROJECT MANAGEMENT
This task provides hours for RBI' s Project Manager and Principal- in- Charge to oversee and direct RBI staff efforts on each task and hold key conversations with City staff when needed.

Michael King a 1 08ERi'ssol- BR)'Al 1P1G
City of Lathrop
Solutions forProgresa
November 7, 2022

Page 8 ends

In addition, this task provides time for project coordination by phone, email, and fax with other project team members, budget and schedule tracking, invoicing, and other duties to coordinate/ administer the project.

Additional Assumptions of this Scope of Work
The level of effort for this scope is limited to the hours budgeted. Should additional services be requested due to additional requests of City staff that are not identified herein, or should analyses of greater scope or depth than identified and budgeted herein be required, RBI will notify the City to discuss the extent of any out- of-scope services needed/ requested. Should out- of-scope services be requested by the City, RBI will submit a supplemental scope and fee proposal for those services.

II. SCHEDULE
RBI can begin providing professional services associated with the tasks defined herein upon receipt of a signed contract or written authorization to proceed.

III. CONTRACT AND BILLING ARRANGEMENT
RBI will complete the scope of work defined herein on a time- and- materials basis, with an authorized budget as shown in Attachment 1. RBI will not exceed the authorized budget amount without written approvaL Attachment 1 provides an estimated breakdown of the total budget by task based on RBI' s 2022 rates ( Attachment 2) for work activities completed October through December 15, 2022, and according to its 2023 rate schedule ( Attachment 3) for all services provided between December 16, 2022 and December 31, 2023.

If you have any questions regarding this proposal, please do not hesitate to contact me at 916) 261- 4043. We look forward to continuing to assist the City with its NPDES permitting and compliance needs.

Sincerely,
r
1,-, ,- , ---_
Michael Bryan, Ph. D.

Managing Partner
Attachment 1: RBI Budget
Attachment 2: 2022 Fee Schedule
Attachment 3: 2023 Fee Schedule
m
t e~i' . i K
N N : H.. N N N fR
y
61 t0 .. . . OD F+ ( G . 4.. Fl
Y,
t0 O F. OI ilY [+ 7 f {O
y S PV < 1[! tV R
b H
N

Q M M M N M N M M
O O v v ^
S m t6 m
H O j W W '
y
N M
O O
fV tV
O
m
d W m N w a
CA N N
m
A
p y O
CV
C ` O
m CtY N M
O
p Ot CY
C
tn a` ' v
tA M N
ta ID CV "
m Np
rl p L m
ta m
z
H
W
W e m < ,
A
x
M
o
m a m
U Mry 4
m
M M
C N p
m
I
N f*1
a
rd M N
O v CY V V M 1` 7
O p
Q1 m C M l•1 !/
l6 . 0 7
C a 46 ' m
M M fA M
m
yp C C
C
y
u p
N
o U N
m 5 c ' v,
m
m c W c
U
c
a U a
t^v
i i
g
y
r 1 ti to ts p
N tYl1 N YN N fYl! Gl

F H H H H

H H N F F N
I N . N .' N N M flf. N . N . N
0! fV f N v ff V+ fV f! tV f7 O O O ( V OD O O GD
p @ OD N l")(`! iT n. CO O 7 N. Q 1+ M t0 M { D W V tV fV K
Y
A 9 Ifl fY OD O OD 00 1+. w@ O O tA OD R O V 6Y f0 fD Q1 1'..

N y O 06 N I-. 47.- t0 f" i P../ r Oi Oi fV v V fD V C4 tD 01 v Ki O 0 CV e- N f^Y t l
a
p
N Vi V! V! M V! N WNNNYi W f9NN4i W W ffl H Y N
y
o
c+ e aa o oo mm o r o
m 9
M N OD / V tY N m Ot
d C 91 L
W j
W
J '
N
O
O C
0 C CV
vi W a
M N
v O V v V < P
V tD
iN
ID N
N t0
W m hl
C C t.
m
a V
W M N
v O Qp
Op m
V
C C f0 C
m m U N u
N
OD OP V O/ D f0 t0 m/ C C CO OD
O'1 V
N A
F 0
N
Z W m
W N N
A W o m . . ,
y
Y7 N
t0 h ti
u O
V o
a
am
N N
C
OD V tS9 OD p V N
M
10 M v
OD O r f`! M( V lW fY e- CV( Y N OJ fG m SO OD OD
C r N
0/ O
OI C f wY 1
W t
ia m t
w N s w
m
m
j Q
m
O. C
y m n
a ° w r
n'
rn n, a
m aus ]
am
c
N ul N NV«.. C 01 O
E a o. o .`' € c a
te d zs
m o
d dcv da ° a o o
Z. m L" m m «.' m m=-° " i a S m `e
M I a N N
C C•
N
E m Ep ymj
a m LA m Z N m mc c c
a 5 J3
Q' a' ., = y' ,,, Q cS y3 F
V F 07 C O N b R E
O N
V/ Qi C1 O ta Q
N
d 'O d C OT ( q
U F- ' d aJNJNW U u
o i i U m
e- .- -
N f` V fV M J N( D h. W m- N e- N f7
o cv t i ri ai . r v v . r e< v e. r. i v r ci io cc
i Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y ' Y Y Y Y ' t6
N M N tlf N M N N N N N N N td N N N N N N tll
Yy
W
F- M- 1- i- F H F- 1- F-- t- F- F- F- i-- 1- 1- F- h- F- F- F10 t-: Ra a r ofr- B e 1nG
Soludons tor Progress
ATTACHMENT 2
2022 FEE SCHEDULE
Charges for project work performed by Robertson- Bryan, Inc. ( RBI) will be calculated and billed at the hourly rates shown below.

PROFESSIONAL SERVICES RATE/ HOUR
Managing Partner 325. 00
Partner 316. 00
Principal Engineer/ Scientist 308. 00
Senior Consultant 291. 00
Resource Director 278. 00
Associate 267. 00
Senior Engineer/ Scientist II 261. 00
Senior Engineer/ Scientist I 249. 00
Project Engineer/ Scientist III 229. 00
Project Engineer/ Scientist II 219. 00
Project Engineer/ Scientist I 199. 00
Staff Engineer/ Scientist II 186. 00
Staff Engineer/ Scientist I 170. 00
Technical Analyst 162. 00
Graphics/ GIS 148. 00
Laboratory Compliance Specialist 144. 00
Administrative Assistant 106. 00
Intern 69. 00
Up to ten percent( 10°/ o) of subcontractor charges will be added to cover administrative costs.

Hourly rates will be increased by a minimum of fifty percent( 50%) for depositions, trials, and hearings. Rates will be adjusted annually. Rates are adjusted annually, effective December 16t"

INVOICING AND PAYMENTS
Invoices will be issued on a monthly basis for all work performed on a project. Payment is due upon receipt of the invoice.

R- e
Solattona tor Progress
ATTACHMENT 3
2023 FEE SCHEDULE
Charges for project work performed by Robertson- Bryan, Inc. ( RBI) will be calculated and billed at the hourly rates shown below.

PROFESSIONAL SERVICES RATE/ HOUR
Managing Partner 339. 00
Partner 332. 00
Principal Engineer/ Scientist 323. 00
Senior Consultant 306. 00
Resource Director 289. 00
Associate 279. 00
Senior Engineer/ Scientist II 275. 00
Senior Engineer/ Scientist I 261. 00
Project Engineer/ Scientist Ill 239. 00
Project Engineer/ Scientist II 229. 00
Project Engineer/ Scientist I 209. 00
Staff Engineer/ Scientist II 195. 00
Staff Engineer/ Scientist I 179. 00
Technical Analyst 167. 00
Graphics/ GIS 148. 00
Laboratory Compliance Specialist 144. 00
Administrative Assistant 111. 00
Intern 69. 00
Up to ten percent( 10%) of subcontractor charges will be added to cover administrative costs.

Hourly rates will be increased by a minimum of fifty percent( 50%) for depositions, trials, and hearings. Rates will be adjusted annually. Rates are adjusted annually, effective December 16rn

INVOICING AND PAYMENTS
Invoices will be issued on a monthly basis for all work performed on a project. Payment is due upon receipt of the invoice.

ATTACHMENT
G
r_.

AMENDMENT NO. 2

TO THE AGREEMENT BETWEEN THE CITY OF LATHROP AND
ROBERTSON- BRYAN, INC DATED NOVEMBER 8, 2021

TO PROVIDE PROESSIONAL SERVICES TO ASSIST WITH

IMPLEMENTING ALL REQUIREMENTS OF THE CITY OF LATHROP

CONSOLIDATED TREATMENT FACILITY NPDES PERMIT
THIS AMENDMENT ( hereinafter " AMENDMENT NO. 2") to the agreement between Robertson- Bryan, Inc. and the City of Lathrop dated November 8, 2021, hereinafter" AGREEMENT") dated for convenience this 12th day of December 2022, is by and between Robertson- Bryan, Inc. (" CONSULTANT") and the City of Lathrop, a California municipal corporation (" CITY");
RECITALS:

WHEREAS, CONSULTANT is specially trained, experienced, and competent to perform Professional Engineering Consulting Services for the City of Lathrop, which are required by this agreement; and
WHEREAS, CITY selected the CONSULTANT pursuant to said qualifications; and WHEREAS, on November 8, 2021, CONSULTANT and CITY entered into an AGREEMENT for Professional Engineering Consulting Services to Assist the CITY with NPDES Permit Compliance for the Consolidated Treatment Facility Surface Water Discharge Project, CIP WW 20- 17, in the amount not to exceed $ 294, 532; and WHEREAS, on December 12, 2022, CONSULTANT and CITY entered into an Amendment No. 1 to the AGREEMENT for Professional Services to Prepare the City of Lathrop Consolidated Treatment Facility for Discharge of Effluent to the San Joaquin River for the Consolidated Treatment Facility Surface Water Discharge Project, CIP WW 20- 17, in the amount not to exceed $ 262, 082.

WHEREAS, CONSULTANT provided scope of work attached hereto as Exhibit" A" for Amendment No. 2 to Provide Professional Services to Assist with Implementing all Requirements of the City of Lathrop Consolidated Treatment Facility NPDES Permit through December 2023, in the amount not to exceed $ 259, 290; and WHEREAS, CONSULTANT is willing to render such Professional Engineering Consulting Services, as hereinafter defined, on the following terms and conditions; NOW, THEREFORE, CONSULTANT and the CITY agree as follows:

Page 1 of 3 ends

CITY OF LATHROP — AMENDMENT NO. 2 TO PROVIDE PROFESSIONAL SERVICES

TO ASSIST WITH IMPLEMENTING ALL REQUIREMENTS OF THE CITY OF LATHROP

CONSOLIDATED TREATMENT FACILITY NPDES PERMIT
AMENDMENT NO. 2 TO AGREEMENT
1) Scope of Service. Section ( 1) of the AGREEMENT is hereby amended to add the following:

CONSULTANT agrees to perform Professional Engineering Consulting Services in accordance with the scope of work and fee proposal provided by CONSULTANT, attached hereto as Exhibit "A" in addition to the scope of work in the original AGREEMENT dated November 8, 2021. CONSULTANT agrees to diligently perform these services in accordance with the upmost standards of its profession and to CITY' S satisfaction.
2) Compensation. Section ( 2) of the AGREEMENT is hereby amended as follows:

City hereby agrees to pay CONSULTANT an additional sum of 259 290 for the Professional Engineering Consulting Services set forth in Exhibit " A".

CONSULTANT shall be paid within thirty ( 30) days of receipt of billings containing all information contained in Paragraph 5 of the original AGREEMENT.

Compensation for any task must be equal to or less than the percentage of task complete. In no event shall CONSULTANT be entitled to compensation for work not included in the original scope of work and this AMENDMENT unless a written change order or authorization describing the extra work and payment terms has been executed by CITY'S Authorized Representative prior to the commencement of the work.
3) Effective Date and Term
The effective date of AMENDMENT NO. 2 is December 12, 2022, and it shall terminate no later than December 31, 2023. All other terms of the original AGREEMENT shall remain in full force and effect.
4) Applicabilitv to Oriqinal Consultant AGREEMENT
All terms and conditions set forth in the AGREEMENT dated November 8, 2021 are still in effect and are incorporated by reference herein and said AGREEMENT is incorporated by reference herein.
5) Siqnatures
The individuals executing this AMENDMENT NO. 2 represent and warrant that they have the right, power, legal capacity, and authority to enter into and to execute this AMENDMENT NO. 2 on behalf of the respective legal entities of the CONSULTANT and the CITY. This agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns.

Page 2 of 3 ends

CITY OF LATHROP— AMENDMENT NO. 2 TO PROVIDE PROFESSIONAL SERVICES

TO ASSIST WITH IMPLEMENTING ALL REQUIREMENTS OF THE CITY OF LATHROP

CONSOLIDATED TREATMENT FACILITY NPDES PERMIT
Approved as to Form: City of Lathrop
City Attorney
z Y z o L
Salvador Navarrete Date
Recommended for Approval: City of Lathrop
Assistant City Manager
Michael King Date
Approved by: City of Lathrop
390 Towne Centre Drive
Lathrop, CA 95330
Stephen J. Salvatore Date
City Manager
Consultant: Robertson- Bryan, Inc.
3100 Zinfandel Drive
Rancho Cordova, CA 95670
Phone: ( 916) 714- 1801
Federal ID # 68- 0460693
Lathrop Business License # 20647
Signature Date
Print Name and Title

Page 3 of 3 ends

EXHIBIT"••
Rae mon- BRrRn, lnc,
Sotufions for Progress
November 7, 2022

DELIVERED BY EMAIL
Mr. Michael King
Assistant City Manager
City of Lathrop
390 Towne Centre Dr.

Lathrop, CA 95330
Subject: Proposal to Provide Professional Services to Assist with Implementing all Requirements of the City of Lathrop Consolidated Treatment Facility NPDES Permit through December 2023
Dear Mr. King:

Robertson- Bryan, Inc. ( RBI) has been assisting the City of Lathrop ( City) in preparing to discharge treated effluent from its Consolidated Treatment Facility ( CTF) to the San Joaquin River. This proposal is for RBI services that need to be completed to maintain compliance with its National Pollutant Discharge Elimination Permit( NPDES) permit through the end of 2023. These tasks are explained further in the detailed scope of work and budget provided below.

I. SCOPE OF WORK
TASK 1: NPDES PERMIT REPORTING
Subtask 1. 1: Routine Self-monitoring Reports ( SMRs)
RBI will assist the City with preparing and reviewing data files and cover letters for routine SMRs, which includes monthly, quarterly, and annual reports. RBI also will assist with preparation and review of the Discharge Monitoring Report( DMR) that is required with each SMR submittal. Both the DMR and SMRs are uploaded to the California lntegrated Water Quality System ( CIWQS) database. RBI will assist the City in preparation of draft SMRs and will review draft SMR and DMR data files to ensure they contain the NPDES permit- required information, the calculated and analytical parameters are accurate, and the contents of the cover letter and any attachments are consistent with the reported data. RBI will work with the City to finalize the SMRs for upload to CIWQS and will coordinate with the City to ensure the SMRs are submitted and certified in CIWQS by the report due date. The City is responsible for conducting the final submittal and certification of SMRs in CIWQS. Hours budgeted are for providing assistance with SMRs/ DMRs for the following submittals. 3100 Zinfandel Drive, Suite 300 Phone 916. 714. 1801
Rancho Cordova, CA 95670 Fax 916. 714. 1804
www.robertson- bryan. com
Michael King r Ro8 o1r' BRi'N! n
City of Lathrop
Sotntions forProgress
November 7, 2022

Page 2 ends

Report Type Reporting Period Report Due Date
Monthly September 2022 November 1, 2022
Monthly October 2022 December 1, 2022
Monthly November 2022 January 1, 2023
Monthly December 2022 February 1, 2023
Monthly January 2023 March 1, 2023
Monthly February 2023 April 1, 2023
Monthly March 2023 May 1, 2023
Monthly April 2023 June 1, 2023
Monthly May 2023 July 1, 2023
Monthly June 2023 August 1, 2023
Monthly July 2022 September 1, 2023
Monthly August 2022 October 1, 2023
Monthly September 2022 November 1, 2023
Monthly October 2022 December 1, 2023
Monthly November 2022 January 1, 2024
Quarterly 3
d Quarter 2022 November 1, 2022
Quarterly 4 Quarter 2022 February 1, 2023
Quarterly 1St Quarter 2023 May 1, 2023
Quarterly 2
d Quarter 2023 August 1, 2023
Quarterly 3
d Quarter2023 November 1, 2023
Annual CalendarYear2022 February 1, 2023
Subtask 1. 2: One- time Reports
RBI will prepare the following one- time reports required by the NPDES permit. While the one report is due February 1, 2024, RBI will need to begin working on it by December 2023, hence its inclusion in this scope of work.

Analytical Methods Report Certification due January l, 2023 Mercury Pollution Prevention Plan due February 1, 2024
TASK 2: COORDINATION AND REVIEW OF CONTRACT LABORATORY TESTING Subtask 2. 1: Whole Effluent Toxicity Testing
RBI will assist the City with scheduling, coordination, and reviewing results of routine, quarterly whole effluent toxicity (WET) testing required by the NPDES permit during Ql—Q4 2023 ( four routine quarterly reports). RBI will advise the City on whether permit-required accelerated testing or a
toxicity reduction evaluation ( TRE) has been triggered. In the event a Michael King Ro' soH BRYA lx
City of Lathrop
SotutlansforProgress
November 7, 2022

Page 3 ends

TRE is triggered by the routine bioassay results, the City must submit a TRE Action Plan to the Central Valley Water Board within 30 days. Budget is provided for RBI to prepare one ( 1) TRE Action Plan for the City to provide a timely submittal, should a TRE be triggered. RBI will provide a separate scope and budget to provide assistance beyond the hours budgeted herein in the event that additional effort is required to assist implementing routine testing, accelerated testing, or a TRE. We assume that the City will contract laboratory testing services separate from RBI' s contract and that Veolia operations staff will collect the effluent samples used for bioassay testing.

Subtask 2. 2: Effluent and Receiving Water Characterization Monitoring The City is required to conduct four quarters of effluent and receiving water characterization monitoring during Q2 2023—Q1 2024. RBI will coordinate with the City, Veolia, Compliance First, and FGL to ensure that the testing will be completed as required. This scope of work and budget assumes that Veolia or FGL will collect the effluent samples, Compliance First will collect the receiving water samples, and FGL will be responsible for analytical testing.

RBI will review the laboratory reports, coordinate with FGL on any QA/ QC issues, and prepare the data for submittal to CIWQS with the SMRs.

Subtask 2. 3: Pyrethroid Pesticides Monitoring
The City is required to conduct four quarters of effluent and receiving water monitoring for pyrethroid pesticides and acute toxicity using the pyrethroid- sensitive test species, Hyalella aztecca during Q2 2023—Q1 2024. RBI will coordinate with the City, Veolia and FGL to ensure that the testing will be completed as required. This scope of work and budget assumes that Veolia or FGL will collect the effluent samples, Compliance First, LLC will collect the receiving water samples, and McCampbell Analytical will conduct the testing under subcontract to FGL. RBI will review the laboratory reports, coordinate with FGL and McCampbell Analytical on any QA/ QC issues, and prepare the data for submission to CIWQS with the SMRs.

TASK 3: TEMPERATURE COMPLIANCE
RBI will conduct daily (weekday) tracking of the San Joaquin River temperature in accordance with procedures developed by RBI under separate contract. This tracking will be conducted in the months identified as having the potential to have a CTF effluent- river temperature differential> 20° F. With initiation of river discharge in April 2023 and based on RBI' s familiarity with other Delta dischargers, the months of November and December 2023 are the months in which tracking will need to be conducted. Ifthe river temperature falls below the temperature identified from the above analysis, then RBI will notify the City and Veolia, so that CTF effluent can be diverted to the cooling ponds.

TASK 4: SEWER RATES EVALUATION
RBI will review the City' s current wastewater rate structure in light of anticipated annual expenses for operating and maintaining the CTF under the new NPDES permit, for preparing Michael King Z i?OBFR1xo1'1 BR1'An! J
City of Lathrop
SolatlnnaforProgress
November 7, 2022

Page 4 ends

the reports needed in compliance with the NPDES permit, and continuing to operate the recycled water system. This review also will consider the City' s planned population growth and future needs ( and timing) for expanding the CTF treatment capacity to accommodate planned and approved growth. Based on this review, RBI will provide input to the City' s rate consultant to update the rate consultant' s rate model and then review the model as it is being developed. Ifrate increases are needed, RBI will also consult with City management on approaches to implementing those rate increases.

TASK 5: ADDITIONAL SERVICES
This task provides funding to be used to provide additional RBI services as directed by the City, as the need arises. This facilitates timely and effectively addressing unanticipated or expanded issues as they arise without delays that would otherwise be incurred to seek a contract remedy prior to proceeding. Work under this task will be at the direction of the City Manager or Assistant City Manager.

TASK 6: MEETINGS
This task provides for up to two meetings per month from September 2022 through December 2023 for a total ofthirty-two ( 32) meetings for RBI staff to meet with City staff and its contractors/ consultants to coordinate efforts and obtain information associated with implementing this scope of work. For the purposes of the scope and budget for this task, two 2) hours are assumed for each RBI staff inember attending each meeting, which provides time for meeting/ call preparation, participation, and post- meeting briefings of other parties not attending the meetings.

TASK 7: PROJECT MANAGEMENT
This task provides hours for RBPs Project Manager and Principal- in- Charge to oversee and direct RBI staff efforts on each task and hold key conversations with City staff when needed.

In addition, this task provides time for project coordination by phone, email, and fax with other project team members, budget and schedule tracking, invoicing, and other duties to coordinate/ administer the project.

TASK 8: CTF PROGRAM MANAGEMENT
This task provides funding for RBI' s Project Manager and Principal- in- Charge to assist City staff in identifying and scheduling all tasks that need to be completed ( including tasks lead by other parties) to: ( 1) coordinate all necessary monitoring and reporting under the NPDES permit, and ( 2) maintain compliant operations. RBI will ensure that all necessary coordination among Veolia, PACE, Woodard& Curran, City, RBI, and others happens when needed. This will ensure that appropriate and timely actions are assigned to the proper parties to facilitate operating the CTF in a manner that is efficient, complies with its permits, and consolidates its permits in a
timely manner to minimizing regulatory reporting efforts. The management Michael King Ros ox- BRIArL l
City of Lathrop
SoluCrons tarProgress
November 7, 2022

Page 5 ends

efforts under this task do not include hours for managing the implementation of RBI' s technical tasks identified herein, which is budgeted under Task 7.

Additional Assumptions of this Scope of Work
The level of effort for this scope is limited to the hours budgeted. Should additional services be requested due to additional requests of City staff that are not identified herein, or should analyses of greater scope or depth than identified and budgeted herein be required, RBI will notify the City to discuss the extent of any out-of-scope services needed/requested. Should out-of-scope services be requested by the City, RBI will submit a supplemental scope and fee proposal for those services.

II. SCHEDULE
RBI can begin providing professional services associated with the tasks defined herein upon receipt of a signed contract or written authorization to proceed.

III. CONTRACT AND BILLING ARRANGEMENT
RBI will complete the scope of work defined herein on a time- and- materials basis, with an authorized budget as shown in Attachment 1. RBI will not exceed the authorized budget amount without written approval. Attachment 1 provides an estimated breakdown of the total budget by task based on RBI' s 2022 rates ( Attachment 2) for work activities completed October through December 15, 2022, and according to its 2023 rate schedule ( Attachment 3) for all services provided between December 16, 2022 and December 31, 2023.

If you have any questions regarding this proposal, please do not hesitate to contact me at 916) 261- 4043. We look forward to continuing to assist the City with its NPDES permitting and compliance needs.

Sincerely,
Michael Bryan, Ph. D.

Managing Partner
Attachment 1: RBI Budget
Attachment 2: 2022 Fee Schedule
Attachment 3: 2023 Fee Schedule
ad" e
M .., N M M
v tv tc
Y
m s mrn rt
s
4 N
H fA N N
C
O
p
O
O
y
C
W J = dlN
Q O)
O C c, N
C C m
N 01
C T. W a
M
t0
@
p m m C N
C C 0 @
CA
W v
O
o or N
c
m v
jj M { q
rl
m O A

C-' N '
z w o
w
sy "
A
m
H N
x
V @ m
Q, -- a a
F [ Q m
G. m
F Py Ni M
C M A
M
ce O
a r
N
y y 4C1
m
M
O . 0 f
C
u
t0 m
ga vs us a, en
N IJ
v
C tJS
a0
0 c0
N
mc
o
m
N M : N ' N M V N N - V
z
Q O l0 OD fV l'V N N t0 N CD.. .. f .

N
4? ( O tD CD f0 M l`1 ( O
M7 M O + f OY ! O ( O r[' f 4'i
M .

Mhl r M M N M
0' h_
y
u us w. s r 4 u vi ts rs tir
c
O tp M r N K4
5 8
H C
cA
c y
w Ma
0 O C V N
C C m
N N
Wa
N M

O GO V V W C
M O
m S
O W m O
f`V r
C ' Sw p
t,
WG N M
tL OD N tQ _"
L
M V C] .
h.

O N
m M
CAcr ' Mi N
W tD
rl m
O
W W w m
d w r
A
tD O t0 OD OD OD OD
0 t N
N N 4
w dm I+ y y M M
NF•{ CO O { O f
V O y
d
st V
N (` Y m m ' C m
O i
a r,
M M
CY / V fV W 4' t0 GD Y t0 O
M V MS { jy
N t+ M O
V
m
M M Y4 fA
mC
N
v J Q
r S? o
m ~ a o
m V
N
o a
z oo t
a
m Ew
m o m
o +. W
O
m ca eNa
I m
Vl N Q a a .
i i- tA N V1
r- r - -
Roea rso r- em! n
Sotutlons for Progress
ATTACHMENT 2
2022 FEE SCHEDULE
Charges for project work performed by Robertson- Bryan, Inc. ( RBI) will be calculated and billed at the hourly rates shown below.

PROFESSIONAL SERVICES RATE/ HOUR
Managing Partner 325. 00
Partner 316. 00
Principal Engineer/ Scientist 308. 00
Senior Consultant 291. 00
Resource Director 278. 00
Associate 267. 00
Senior Engineer/ Scientist II 26]. 00
Senior Engineer/ Scientist I 249. 00
Project Engineer/ Scientist III 229. 00
Project Engineer/ Scientist II 219. 00
Project Engineer/ Scientist I 199. 00
Staff Engineer/ Scientist II 186. 00
Staff Engineer/ Scientist I 170. 00
Technical Analyst 162. 00
Graphics/ GIS 148. 00
Laboratory Compliance Specialist 144. 00
Administrative Assistant 106. 00
Intern 69. 00
Up to ten percent( 10°/ o) of subcontractor charges will be added to cover administrative costs.

Hourly rates will be increased by a minimum of fifty percent( 50%) for depositions, trials, and hearings. Rates will be adjusted annually. Rates are adjusted annually, effective December 16tn

INVOICING AND PAYMENTS
Invoices will be issued on a monthly basis for all work performed on a project. Payment is due upon receipt of the invoice.

Ros so r- Bar l,rG
soruHaas fo. arogress
ATTACHMENT 3
2023 FEE SCHEDULE
Charges for project work performed by Robertson- Bryan, Inc. ( RBI) will be calculated and billed at the hourly rates shown below.

PROFESSIONAL SERVICES RATE/ HOUR
Managing Partner 339. 00
Partner 332. 00
Principal Engineer/ Scientist 323. 00
Senior Consultant 306. 00
Resource Director 289. 00
Associate 279. 00
Senior Engineer/ Scientist II 275. 00
Senior Engineer/ Scientist I 261. 00
Project Engineer/ Scientist III 239. 00
Project Engineer/ Scientist II 229. 00
Project Engineer/ Scientist I 209. 00
Staff Engineer/ Scientist 195. 00
Staff Engineer/ Scientist I 179. 00
Technical Analyst 167. 00
Graphics/ GIS 148. 00
Laboratory Compliance Specialist 144. 00
Administrative Assistant 111. 00
Intern 69. 00
Up to ten percent( 10%) of subcontractor charges will be added to cover administrative costs.

Hourly rates will be increased by a minimum of fifty percent( 50%) for depositions, trials, and hearings. Rates will be adjusted annually. Rates are adjusted annually, effective December 16tn

INVOICING AND PAYMENTS
Invoices will be issued on a monthly basis for all work performed on a project. Payment is due upon receipt of the invoice.