ITEM 4. 16

CITY MANAGER' S REPORT
MAY 8, 2023 CITY COUNCIL REGULAR MEETING
ITEM: APPROVE CONTRACT AMENDMENT NO. 2 WITH
SORACCO, INC., FOR ON- CALL CONSTRUCTION

SERVICES FOR WET UTILITY AND STREET REPAIRS
RECOMMENDATION: Adopt Resolution Approving Contract Amendment No. 2 for On- Call Construction Services for Wet
Utility and Street Repairs with Soracco, Inc.

SUMMARY:

On ] uly 13, 2020, Council approved a contract with Soracco, Inc., for an amount not to exceed $ 200, 000 to provide on- call construction services needed for wet utility potable water, sewer, storm drain, and recycled water) and street repair services for planned and emergency work for fiscal year 2020- 21. Following the annual renewal of Soracco' s contract for the same amount in subsequent fiscal years, the current year has witnessed a substantially higher number of emergency repairs. As a result, staff is requesting Council approve Contract Amendment No. 2 with Soracco, Inc., for On- Call Construction Services for Wet Utility and Street Repairs contract in the amount of $ 100, 000 to continue providing these services for the remainder of this current fiscal year.

Sufficient funds are allocated in the approved FY 22/ 23 budget.

BACKGROUND:

The Public Works Department is responsible for maintaining the City' s water, sewer, storm drain and recycled water systems and streets and sidewalks located within the public right- of- way. In situations where urgent wet utility and street repairs that are needed beyond Public Works Department' s resources, on- call constructions services are required.

Staff issued an informal Notice Inviting Bids for the On- Call Construction Services on June 9, 2020, in accordance with the Public Contract Code and the Lathrop Municipal Code, Chapter 3. 30. On July 13, 2020, Council approved a contract with the lowest responsive and responsible bidder, Soracco, Inc., to provide on- call construction services needed for wet utility ( potable water, sewer, storm drain, and recycled water) and street repair services for planned and emergency work for fiscal year 2020- 21.

The contract was amended in December 2021 to adjust the contract award based on allowances for planned and emergency work.

The amount of the original contract award is not- to- exceed cost of $ 200, 000 per fiscal year and based on a time and material basis. Amendment No. 1 is being issued to clarify these specifics.

CITY MANAGER' S REPORT PAGE 2
MAY 8, 2023 CITY COUNCIL REGULAR MEETING
APPROVE CONTRACT AMENDMENT N0. 2 WITH SORACCO, INC., FOR ON- CALL

CONSTRUCTION SERVICES FOR WET UTILITY AND STREET REPAIRS REASON FOR RECOMMENDATION:

For the past two fiscal years, the actual cost services provided by Soracco, Inc. has been within the contracted amount of $ 200, 000 for fiscal year. This year however, due to an unusually high number of emergency repairs, the annual contract amount was exceeded in mid- February 2023. Staff is therefore requesting approval of a contract amendment no. 2 to add $ 100, 000 for the remainder of the 2022- 23 fiscal year.

FISCAL IMPACT:

No fiscal impact.

ATTACHMENTS:

A. Resolution Approving Contract Amendment No. 2 for On- Call Construction Services for Wet Utility and Street Repairs with Soracco, Inc.

B. Contract Amendment No. 2 for On- Call Construction Services for Wet Utility and Street Repairs with Soracco, Inc.

CITY MANAGER' S REPORT PAGE 3
MAY 8, 2023 CITY COUNCIL REGULAR MEETING
APPROVE CONTRACT AMENDMENT N0. 2 WITH SORACCO, INC., FOR ON- CALL

CONSTRUCTION SERVICES FOR WET UTILITY AND STREET REPAIRS AND APPROVALS:
y
r- Y •zy• zoz3
Brad Taylor Date
City Engineer
yla I
Cari Jame Date
Finance Di e tor
2y• 2oz3
Michael King Date
Assistant City Manager
f t zo z3
Salvador Navarrete Date
City Attorney
S• s • 3
S en J. Salvatore Date
City Manager
RESOLUTION NO. 23-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LATHROP APPROVING CONTRACT AMENDMENT NO. 2 FOR ON- CALL CONSTRUCTION SERVICES FOR WET UTILITY AND STREET REPAIRS WITH SORACCO, INC.

WHEREAS, the Public Works Department is responsible for maintaining the City' s water, sewer, storm drain and recycled water systems and streets and sidewalks located within the public right- of-way; and
WHEREAS, on- call emergency construction services are needed to perform in situations where urgent wet utility and street repairs that are needed beyond Public Works Department' s resources, on- call constructions services are required; and WHEREAS, staff issued an informal Notice Inviting Bids for the On- Call Construction Services on June 9, 2020, in accordance with the Public Contract Code and the Lathrop Municipal Code, Chapter 3. 30; and
WHEREAS, on July 13, 2020, Council approved a contract with the lowest responsive and responsible bidder, Soracco, Inc., to provide on- call construction services needed for wet utility ( potable water, sewer, storm drain, and recycled water) and street repair services for planned and emergency work for fiscal year 2020- 21; and
WHEREAS, Contract Amendment No. 1 was issued in December 2021 to clarify that the amount of the original contract award was based on allowances for planned and emergency work to be performed on a time and materials, not-to- exceed cost of $ 200, 000 per fiscal year; and
WHEREAS, the current year has witnessed a substantially higher number of emergency repairs; and
WHEREAS, staff is requesting Council approve Contract Amendment No. 2 with Soracco, Inc., in the amount of $ 100, 000 through the remainder of this fiscal year; and
WHEREAS, sufficient funds are allocated in the approved FY 22/ 23 budget.

NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Lathrop hereby approves Contract Amendment No. 2 to add $ 100, 000 for On- Call Construction Services for Wet Utility and Street Repairs with Soracco, Inc., for the remainder of the 2022- 23 fiscal year.

The foregoing resolution was passed and adopted this 8th day of May 2023, by the following vote of the City Council, to wit:

AYES:

NOES:

ABSTAIN:

ABSENT:

Sonny Dhaliwal, Mayor
ATTEST: APPROVED AS TO FORM:

Teresa Vargas, City Clerk Salvador Navarrete, City Attorney

ATTACHMENT
N w
AMENDMENT NO. 2

TO THE GENERAL SERVICES AGREEMENT BETWEEN THE CITY OF LATHROP AND SORACCO, INC. DATED JULY 13, 2020

FOR ON- CALL CONSTRUCTION SERVICES FOR WET UTILITY AND STREET REPAIRS THIS AMENDMENT ( hereinafter " AMENDMENT NO. 2") to the agreement between Soracco, Inc. and the City of Lathrop dated July 13, 2020, ( hereinafter" AGREEMENT") dated for convenience this 8th day of May 2023, is by and between Soracco, Inc. (" CONTRACTOR") and the City of Lathrop, a California municipal corporation (" CITY"); RECITALS:

WHEREAS, CONTRACTOR is specially trained, experienced, and competent to perform On- Call Wet Utility and Street Repairs for the City of Lathrop, which are required by this agreement; and
WHEREAS, on June 9, 2020, CITY issued an informal Notice Inviting Bids for the On- Call Construction Services; and
WHEREAS, on June 25, 2020, CONTRACTOR submitted a bid for On- Call Construction Services for Wet Utility and Street Repairs; and
WHEREAS, on July 13, 2020, CONTRACTOR and CITY entered into an AGREEMENT for On- Call Construction Services for Wet Utility and Street Repairs, in the amount not to exceed 200, 000 per fiscal year; and
WHEREAS, AMENDMENT NO. 1 Section 2 to accurately reflect compensation per fiscal year; and
WHEREAS, AMENDMENT NO. 2 to add $ 100, 000 to continue providing services for the remainder of this current fiscal year, and
WHEREAS, CONSULTANT is willing to render such On- Call Construction Services, as hereinafter defined, on the following terms and conditions.

NOW, THEREFORE, CONTRACTOR and the CITY agree as follows:

AMENDMENT NO. 2 TO AGREEMENT
1) Compensation. Section( 2) of the AGREEMENT is hereby amended as below:

CITY hereby agrees to pay CONTRACTOR a sum not to exceed $ 100, 000 for fiscal year, 22/ 23 on a time and materials unitary basis, for the services referenced in Section 2, above and at the rates stated in the CONTRACTOR' S bid item schedule submitted on June 25, 2020, attached as Exhibit " A". CONTRACTOR shall be paid any uncontested sum due and payable within thirty ( 30) days of receipt of billings containing all information pursuant to Paragraph 5 below. Compensation for any task must be equal to or less than the percentage of task complete.

Page 1 of 3 ends

CITY OF LATHROP — AMENDMENT NO. 2 WITH SORACCO, INC. FOR ON- CALL CONSTRUCTION

SERVICES FOR WET UTILITY AND STREET REPAIRS
In no event shall CONTRACTOR be entitled to compensation for work not included in Exhibit " A", unless a written change order or authorization describing the new work and payment terms has been executed by CITY' s authorized representative prior to the commencement of the work. Payment is made based on a time and materials basis. 2) Applicabilitv to Oriqinal AGREEMENT
All terms and conditions set forth in the AGREEMENT dated July 13, 2020 are still in effect and are incorporated by reference herein and said AGREEMENT is incorporated by reference herein.
3) Siqnatures
The individuals executing this AMENDMENT NO. 2 represent and warrant that they have the right, power, legal capacity, and authority to enter into and to execute this AMENDMENT NO. 2 on behalf of the respective legal entities of the CONSULTANT and the CITY. This agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns.

Page 2 of 3 ends

CITY OF LATHROP — AMENDMENT NO. 2 WITH SORACCO, INC. FOR ON- CALL CONSTRUCTION

SERVICES FOR WET UTILITY AND STREET REPAIRS
Approved as to Form: City of Lathrop
City Attorney
Z° 3
Salvador Navarrete Date
Recommended for Approval: City of Lathrop
Assistant City Manager
Michael King Date
Approved by: City of Lathrop
390 Towne Centre Drive
Lathrop, CA 95330
Stephen J. Salvatore Date
City Manager
Consultant: Soracco, Inc.
903 E. Lodi Ave.

Lodi, CA. 95240
Phone: ( 209) 267- 4030
Federal ID #
Lathrop Business License # 41517
Signature Date
Print Name and Title
Page3of3
EXHIBIT A: CONTRACTOR' S SUBMITTED BID SCHEDULE
EXHI6IT"••
OiV- CALL CONSTTtUCTI03V SERVIC S
FOR WET t1TILITY AND STREE' f REPAIRS
DN- CALL { 3 5' RL3CTItJN SERVICES FflR WET UTILITY AND y TREET

REPAIRS

BID PRICING SCHEDULE
IT M
DE CRI i1 N
U1 ITS RIE
3 Mobiliz tiott nnt Demobilization EA 5
S WEWSTORM DRAIN SY5TE14 BEPAiR
5ewer Main Re iac mment(#' ssr de i3ss u to 5 ieet)
a
2 Less tlaan 12 inc cs in diarsaeter LF
3 l2- inches in dia ter and abave LF p '
Sesver Mnirt Re la me t( t s° de ihs betwe cn 5 and 10 i`ec# 4 Less thz n 12 inchcs in diameicr L Z.t`''`.
5 12- inches in di anete and above LF f D. .
5ewer Main Re laceme t( for de ihs o- eater thsan 10 feet3 G Less than 12 i»rhes in diamet r LF
7 12- inchcs in diameier and at e F
Sewer Main S t Re air frar de ths u t 5 fect)
8 Less thaa I2 inchcs in dia ter A
7 I
l2-h
12- irsctscs in diumetcr antl bove EA G
Scwer Main S ot 1Re s ir( for de il ss between 5 and 10 lcet) tfl C. ess t# n 12 inches in diat t r EA D
11 12- iaches in diameter antt abovc EA
Sewer Mnin S t Rc sir fflr de ihs reAtcr than Ii?fe t)
2 l.ess than 12 inchcs in diarne r A 5
l3 12- inches in diart cler and above EA
Starm D siaa Niaia Re oirs ffor de # 6s u to 5 fcet)
lA Less an i5- inches in dinmeter LF p
15 flvcr 15- i» c} ses to 24 in hes in diameter LF
t b Ovec 24 irsches to 36 incitics i n diameter LF S 5
17 Ctver 36 inches ta 48 inthes in diarneter Lfi b
A- 2
UN- CALL C{ JNS' iRUC170N SERVICES
UR W T IifitLITY AND S' TREET REPAIRS
Storm i7ruin Meors Re uirs( for de ths bcEween 5 zand i0 feet) 18 Less than i5- i ri es in cliameter LF
v
19 Over 15• inches Rcs 24 in h in diameier i,F 0027
2{ ver 24 inches tca 36 isaches in dia cec L 5 '
2i i ver 3E inch s to 8 inches in diameter LF Zds
St cm Drsin Main Re airs ftir de ths re ter thsn 1 feet) 22 l,e.:ss ihan 1S- nches in diaca ter LF D
23 Cl et 15- inches to 24` s cches in diametcr F
U
24 C er 24 inches tc 35 inches in diameter F
25 C ver 36 inches to 48' snclzes in diameter L S nt1
2b S er L tcral Re tacerceemt LF bt7
2? Sewer Lnterat S ot Rc air A S - O
SewerfStorm ht anhale Re irs
28 Re air aC i a trou h and sheit basa; inside c f manhal EA l tqv 29 R lace rnanhc le fra e and ct er EA 7. S o
WATE ECYCLED WATER SYS' i' t4i BEPAIRS
4Vater hYa' s» Re lacemeni{' 4r de ! hs u to 5 teet3
3 b-inci es in liarnet r t,F S v
3l 8- inches in iiams; ter L 2
32 1{? inch s in iiarneter LF
33 12- inchcs fn di mctcr LF S 32-
3 i Ib- inches in diameter LP
35 Over 16- inchcs in diametcr LF 2
Wz ter Muin Re acement([ or de tt s between 5 end 1Q feet} 3b 6• inchcs in diameter L
37 8- iaches in diameter LF 32'
38 1{ a- inches in diumctc LF
39 12- inches in diameter LF b
Z
d(i i6-inches in diameter LF
A- 3
UN- CALL CONSTR[! CT' ION SERVICES
FUR 6VE'T UTILI' TY AND STREE'T REPAIRS
41 L?ver l6- inches in diameter LF 5 u
Waicr Main S t Re aic{ for de ths o to 5 teet)
4Z 12- inches or less diametQc EA 5 5
43 f3ver 12- inches ia diameter EA 5
Water M in S ot R air( 1`or de ths belween 5 and 1€} T+eet) 44 P2- inches or tess di mcter EA 1 vv
45 Over t2- inc3ses in diame er A a v
VYuter 5 rvice Line Replsr emen#{ irenchless, 1- 1t2 to Z- 3nc6 46 diamc# er) LF
4? ' 4Vflies Service Line 5 ot Re uir 1 1 ( 1
48 Fire H =drant Kuuckdown Re sis Er r
49 Fire H drant Ktaockdown Re lacemenk f7
Water S tem Yalve Re laccrnesat
n
p.

SO G- inches in d'oameter EA c to
51 8- inchcs in diameter EA l( d
52 ifl-in hes in diameter Er l ` d+
S: i 12ainches in diameter A p oJ:7
54 16- inches in diametcr fi y
55 18- inches in diametcr Eq 1 t j"
55 ARV Volve Re lucement A
57 Mcier/Meter Box Rc lucemeni EA

STREET AND SIDEWALK REPAIRS
S8 SaivCuttin As hult Caarrete Pavemcnt er inch de ih cut) LF 59 As halt Concrete PAvemeat Re ir( c 2- 112- incf es thick Tift) SF Ct3 Cor ccete SIdewalk Removal& Re lareroent SF Lti
61 Concnie Curb and Gutter Removai& Re iacement LP J 5' TOTAL T.JNIT PRICE{ ITEMS 1- 61} g j C' J 2' 6 `

CONTRACT IS TO BE AWARDED BASED ON BID PRICING SCHEDULE WITH THE L4WEST i3NIT PRICES
A-A
ON- CALL CONSTRU' TIdN SERYICES
UR 1V£ T UT[ LIT1' AND STREET R PAIRS

ATTACH TIME AND MATERIALS RAT SHEET
ALLOi' ANCE iT S
Ailowance for working in locut ons with Tixne& I TE
i et hanced raflic conttol l EA Materiais $ 10,({ l
Atlowance fc r canexpected Seld candivans csr
issuas thna axe tseyond the scapc of typica9 wet Time& N'!`E 2 utilic c rs etrt air 1 EA tviateriats $ I5,
Tiinc& NTE
A11 Plannec3 Work i EA M terials 125,{} p}
Ttme& N1' E
3 A! i Emcr enc Work 3 EA M tcrials 50,
A- 5
s'.
x:%.. , s.
i I y x !
e"`:'."''.. ,,
qr.r
u :..,.'
w.. M,:.', ae,.:*' .', „„'.' ,,'^•..
r
r m. ,
0 3 ` Inc.

GENERAI. EPIGINEERING & BUtL. D(NG CONTRACTOR

TIME & MATERIAL RATES

EQUIPMENT
NOTE: Equipment Rates c ude Markup But Are` Bare — No Labor Is Included( see below) Additional Equipment surcharges may apply when rental cosu exceed rates listed below Rates Do Not lnclude Extra Charge For Worl: ing[ n Rock Conditions Rates Include Consumables and Minor Tools)
Rental Equipment viil be charged at the fuli im oice pnce Teichert rzsenes the nrJ t to impose a fuel surcharge Rate Per Hour
Pickups
ACA F150 2wd'/: Ton Pickup 25. 00
ACB F250& F350 Pickup 29. 00
ACD F350 Pickup w/ Utiliry Body 25. 04
ACE F550 Crew Truck& Cone Truck 29. 00
ACF F250& F350 4wd Pickup 25. 00
ACH F550 w/Utility Body Mechanics& Plumbers 29. 00
Hammers
HYD Hydraulic Hammer, Excavator Attachment 25. 00
Paver
FBD Asphalt Paver 275. 00
Tractors/ Backhoes/ Loaders
LBC Loader, Scraper J0210LJ 8 Case 570MXT 60. 00
LBF Loader, Backhoe JD 410G 85. 00
LBM Loader, 3Yd Voivo L120 121. 00
LBS Skid Steer, Cat 259D 50. 00
Motor Graders ( Blades)
MHD Motor Grader, Cat 140G 140. 00'
Rollers/Compactor
RBH F2olier, Pneumatic, 10 Ton, IR PT125R 75. 00
RKA Compactor, Cat 815F 175. 00'
RVC Rofler, Vibratory, Cat C6224E, CB24, C832 55. 00
RVN Roller, Vibratory Pad Drum, Cat CP566 115. 00
Excavators
SGA SGA— Excavator 60. 00
SGC Excavator, Cat 308D CR SB 70. 00`
SGD Excavator, Cat 325 130. 00'
SGF Excavator, Cat 336 180. 00'
Dozers
TDB Crawier, Cat D4H 120. 00
TDC Crawler, Cat DSKXI 120. 00
TDD Crawler, Cat D6R 150. 00'
TDJ Crawler, Cat D10R, D10T 400. 00
TDM Crawler, Cat DSR, DST 258. 00'
TDO Crawler, Cat D9R 325. 00`
Scrapers
Rates are e/ fertive from Juy 2029 ihrough lune 2020. Somcco, lnc. reserves theright to modify this schedule ot arty time. Page 1 of 4 s`°
r`" „
s :.
z^„. r
Y ei : ., a'"
t= g
uc. r, ozseo3 ,--- nG.

GEWERAL NGIN RtNG & BUIL. DING CONTRACTOR

TIME & MATERIAL RATES
TEF Scraper, Open Bowl, Cat 631 E 288. 00*
TEL Water Pull, 8000- Gat, Cat 623 185. 00"
TEN Scraper, Elevaiing Cat 623G 258. 00'
TEO Scraper, Cat 627 350. 00'
TEQ Scraper, Cat 637G 375. 00'
TET Scraper, Elevating Cat 6 3C 155. 00'
Trucks
TRC Truck, HD Flatrack, Inciudes Fiatbed Trailer 60. 00 TRL Truck, Water, Peterbiit 359 90. 00
TRO Truck. 3- Aule& End Dump Trailer 99. 00
TRQ Truck, TranspoR, Lowbed 100. 00
TRS Truck, Sweeper 200. Q0
TRV Truck, Vacuum 275. 00
Forklifts
UAB Pneumatic Forklift 4, 000— 6, 000# Gapacity 63.00
UAC Pneumatic Forklift 13, 000— 16, 000# Capacity 63. 00 UAT Telescoping Forklift 80. 00
When working in rock add per hour:

MHD 15. 00
RKA 20. 00
SGC 10. 00
SGD 10. 00
SGF 12. 00
TDD 10. 00
TDM 15. 00
TDO 20. 00
TEF 15. 00
TEL 20. 00
TEN 20. 00
Ratesareef ec[ ive/ romluy 2019 through June2020. Sorocco, Inc. reservestherightto modify thisscheduleotany time. Page 2 of 4 R .. -,: 1 3
LIC. # 1028603 ''"°, " nC.

G NERAI. ENGINEERING & BUILDING CONTRACTOR

TIME & MATERIAL RATES
LABOR( Northern Caiifornia Rates)
NOTE: Labor Rates Include Markup
ReEular Time Overtime Double Time
Foremen
Operating Engineer Foremen 130. 00 172.00 213. 00
Labor Foremen
Carpenter Foremen
Cement Mason Foremen
Plumber Foremen
Operator— Class 1
Motor Grader( Blade) 128. 00 168. 00 207. 00
Excavator
Cranes
Operator— Class 2
Loader 125. 00 163. 00 202. 00
Dozer
Grade setter
Asphalt Paver
Tractor wlScraper
Finish Roiler( Asphalt)
Backhoe
5craper
Mechanic
Compactor
Trencher
Operator— Class 3
Apprentice 123. 00 163. 00 197. 00
Concrete Paver/Trimmer
Hydralift
SurveyoNChainman/ Rodman
Screedman
Chip Spreader
Rolier{ non- asphalt)
Oiler
Laborers

94. 00 122. 00 149. 00
if Laborers are working in Alameda, Contra Costa, Marin, San Francisco or Santa Cla2 Counfies, rates for labo2rs increase by

51. 00
Carpenter 122. 00 156. 00 195. 00
Cement Mason os. 00 iss. 00 ss. 00
Teamster( Drivers) io2. 00 2s. 00 159. 00
Plumber i. 00 za. 00 i a. 00
Rates ase effect'rve from Juy 2019 through J ne 1020. Sorocco, Inc. reserves the righi to modijy thisschedule ot ony time. Pdge 3 of 4 c" ,
a z
r *
y « r- r
b
J',
oz 3 ;« n
Inc.

G NERAL ENGINEERING & UIL. DING CONTRACTOR

TIME & MATERIAL RATES
1 SMALL TOOLS
NOTE: Additional Equipment surcharge may apply when rental costs exceed rates listed below.

Rate Per Day
Small Tools& Miscellaneous (Mark-up Inctuded)
SE- AHB Not box asphalt 2 ton trailer 146. 00
SE- APS Airless Paint Striper- Ride O 260. 00
SE- ATV AN/Kubota Utility Vehicle 56. 00
SE- BCA Skidsteer Buckets/ Fork Attachments 8. 00
SE- SCB Breaker& Broom Attachment 92. 00
SE- BCC Manhole Cutter Attachment 176. 00
SE- BEH Seif- propefied Broom 160. 00
SE- BGB 13" Brum Grinder Attachment 600. 00
SE- BGD HRZ Drill Attachment 80. D0
SE- BGR GrinderAttachment 360. 00
SE- CBE Air Compressor( 185 cfm) 72. 00
SE- CBF Air Compressor( 210 cfm) 76.00
SE- CBG Air Compressor( 300 c(m- 700 cfm) 112. 00
SE- CMS Changeable Message Sign Board 112. 00
SE- CMT Mini Message Board SO. Oo
SE- CSM Crack Sealer Machine 480. 00
SE- CSS Speed Board 72. 00
SE- CSU Hydraulic Pipe Fusion Machine 104. 00
SE- FAU Arrow Board 48. 00
SE- GAD Generator= or< 25kw- tow 84. 00
SE- GAE Generator> 25kw- tow 200, 00
SE- GDD EZ Drill- 5 Driil 432. 00
SE- GDR EZ Drili- Single 88. 00
5E- KRL Kraii Clamp 80. 00
SE- LBS Skidsteers 280. 00
SE- LTO Light Towers- Tow 116. 00
SE- MEH Mortar 8 Concrete Mixers 52. 00
SE- OAK Asphait Emulsion Tac Pot 104. D0
SE- PLG 6" Pumps 80. 00
SE- PLO 12" Hurricane Pump/ Pumpmaster 136. 00
SE- POC Standpipe 18. 40
SE- RMB Rumbie Strips( Set of 6) 48. 00
SE- RSK Shaker Screen 660. 00
SE- RVC 1- 3 Ton Vibratory Roller 160. 00
SE- SCA Dike/ Curb Machine 188. 00
SE- SCB Curb Machine- Gomaco CC1200 268. 00
SE- SCR Concrete Rolier Screed- Ride 240. 00
SE- SGS Concrete Striker Screed 120. 40
SE- SSS Sand Spreader 136. 00
SE- TAJ Water Wagon 64. 00
SE- TAL Laser Trailer 20. 00
SE- TAS Shade Trailer 8. 00
6E- TAT Klein Tank 104. 00
Rates are effective from luy 2019 through lurte 2010. Soracco, lnc. reserves the right to modify thisschedule at any fime. Page 4 of 4