CITY OF LATHROP
ITEM 5.2 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION

REGULAR CITY COUNCIL MEETING
MAY 8, 2023
1 2
 Approximately one-acre neighborhood park.
 Located between Victorian Trail and English
Country Trail.
 Current amenities need to be replaced.
 Creation of CIP PK 22-12 approved June 3,
2021
 Preliminary designs created by Park Planet, a
division of Park Associates, Inc.

CIP PK 22-12 THE GREEN PARK REVITALIZATION

BACKGROUND
Blue and yellow playground structure with small slide and crawling tube with shade structure in background.

BACKGROUND
 Staff has identified the revitalization of The Green Park, a city owned one-acre park located at 16700 English Country Trail.
 Staff contacted Park Planet, a division of Park Associates, Inc. to develop design options for this revitalization project.
 Removal of the outdated play structure, and wood fiber fall surface.  Installation of play area for children 5-12, with structures that could include multiple slides, multiple climbers, multiple ground level and elevated play events, shade, and a variety of other options.

THE GREEN – EXISTING CONDITIONS
• Small, 20+ year old outdated children’s
play area.
• Outdated wood fiber fall surface.
• Play area only accommodates children
ages 3-5.

Blue and yellow playground structure with small slide and crawling tube with shade structure in background. 5 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION
Option 1 –The Green Park Revitalization
This option includes addition of the following amenities:
• Children’s Play Area ages 5-12
• One Overhead Traverse
• Three NFuse Bays
• Three Overhead Shade Sails
• One Nimble Bay Bridge
• 13 Climbers
• 11 Elevated Play Events
• 11 Ground Level Play Events
• Three Slides
The option 1 is an extensive redesign of the existing oneacre park site including the installation of a children’s play area with a material and installation total cost of $681,770. Option one of a playground structure with three slides, three shade coverings, and climbing elements throughout.
6 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION
Option 1
Reverse Side
Option one of a playground structure with three slides, three shade coverings, and climbing elements throughout.
7 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION
Option 2 –The Green Park Revitalization
This option includes addition of the
following amenities:
• Children’s Play Area ages 5-12
• One Nimble Bay Bridge
• Two Slides
• Two Crawl-Netix Climbers
• Five Climbers
• Four Nfuse Bays
• 11 Elevates Play Events
• 11 round Level Play Events
The option 2 is an extensive redesign of the
existing one-acre park site including the
installation of a children’s play area with a
material and installation total cost of $505,406.

Option two of a playground structure with two slides and climbing and balancing elements throughout.
8 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION
Option 2
Reverse Side
Option two of a playground structure with two slides and climbing and balancing elements throughout. 9 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION
Option 3 –The Green Park Revitalization
This option includes addition of the following amenities:
• Children’s Play Area ages 5-12
• One Plastic Hex Shade
• Three Slides
• Two Crawl-Netix Climbers
• 12 Elevated Play Events
• One XM tower
• Nice Ground Level Events
The option 3 is an extensive redesign of the existing
one-acre park site including the installation of a children’s play area with a material and installation total cost of $529,861. Option three of a playground structure with three slides and climbing elements throughout.
10 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION
Option 3
Reverse Side
Option three of a playground structure with three slides and climbing elements throughout.

Overhead View of Design Options
11 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION
OPTION 1: OPTION 2: OPTION 3:

Overhead view of option one playground
structure.

Overhead view of option two playground
structure.

Overhead view of option three playground
structure.
12 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION

FISCAL IMPACT
As part of the FY 21-22 budget CIP PK 22-12
The Green Park Revitalization was approved
with a budget of $255,000.

OPTION 1: Estimated material, delivery,
and installation cost is $681,770.

Option one of a playground structure with three slides, three shade coverings, and climbing elements throughout.
13 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION

FISCAL IMPACT
As part of the FY 21-22 budget CIP PK 22-12
The Green Park Revitalization was approved
with a budget of $255,000.

OPTION 2: Estimated material, delivery
and installation cost is $505,406.

Option two of a playground structure with two slides and climbing and balancing elements throughout.
14 REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION

FISCAL IMPACT
As part of the FY 21-22 budget CIP PK 22-12
The Green Park Revitalization was approved
with a budget of $255,000.

OPTION 3: Estimated material, delivery,
and installation cost is $529,861.

Option three of a playground structure with three slides and climbing elements throughout.
15 The Green Park Revitalization
Tonight, staff is requesting City Council:
• Select Design Option 1, 2, or 3.
• QUESTIONS….

REVIEW AND PROVIDE DIRECTION OF DESIGN OPTIONS
FOR CIP PK 22-12 THE GREEN PARK REVITALIZATION
Option one of a playground structure. Option two of a playground structure.

Option three of a playground structure.