REVIEW AND CONSIDER DESIGN ALTERNATIVES

FOR HISTORIC LATHROP BEAUTIFICATION
PROJECT, CIP GG 24-23

CITY COUNCIL REGULAR MEETING
JANUARY 8, 2024 – ITEM: 5.4
1 BACKGROUND
 On July 10, 2023 City Council approved the creation of CIP GG 24-23 for Historic Lathrop Beautification (Project)
 The Project proposes to construct the following beautification elements:

1. Water fountain at the Basin Park

2. Gateway Arch on 5th St near Lathrop Rd Intersection

3. Gateway Arch on 5th St near Louise Ave intersection
 O’Dell Engineering has been contracted to prepare the design services for the gateway arches
2 Louise Ave
Lathrop Rd
5th St
1 2
3 BASIN PARK
3 AERIAL VIEW
ALT (1) ALT (2) ALT (3) ALT (4) ALT (5)

BASIN PARK

PROPOSED FOUNTAIN STYLES
4 ALT (A) ALT (B)
5 BASIN PARK

SAMPLE FOUNTAIN STRUCTURES
6 LATHROP GATEWAY CONCEPTUAL DESIGN
ALT (A) – TRUSS ARCH
7 LATHROP GATEWAY CONCEPTUAL DESIGN
ALT (B) – RIVER ISLANDS THEME

RECOMMENDATION
8 Staff is requesting City Council to provide direction on:
 Water Fountain:
 Location
 Style
 Arches:
 Conceptual Design
 Structure
 Lighting
 Staff will pursue the design and location selected by Council to coordinate with O’Dell Engineering to consider the water fountain features and complete the design.